Powered by Deep Web Technologies
Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Commercial and Residential Hourly Load Profiles for all TMY3 Locations in  

Open Energy Info (EERE)

and Residential Hourly Load Profiles for all TMY3 Locations in and Residential Hourly Load Profiles for all TMY3 Locations in the United States Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Hourly load profiles are available for over all TMY3 locations in the United States here. Browse files in this dataset, accessible as individual files and as commercial and residential downloadable ZIP files. This dataset is approximately 4.8GiB compressed or 19GiB uncompressed. July 2nd, 2013 update: Residential High and Low load files have been updated from 366 days in a year for leap years to the more general 365 days in a normal year.

2

TMY3 | OpenEI Community  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL...

3

OpenEI Community - TMY3  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

5

tmy3 | OpenEI  

Open Energy Info (EERE)

tmy3 tmy3 Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( Source National Renewable Energy Laboratory Date Released April 05th, 2012 (2 years ago) Date Updated April 06th, 2012 (2 years ago) Keywords AC apartment CFL coffeemaker Computer cooling cost demand Dishwasher Dryer Furnace gas HVAC Incandescent Laptop load Microwave model NREL Residential television tmy3 URDB Data text/csv icon Residential Cost Data for Common Household Items (csv, 14.5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

6

Users Manual for TMY3 Data Sets  

NLE Websites -- All DOE Office Websites (Extended Search)

Users Manual for TMY3 Data Sets Users Manual for TMY3 Data Sets S. Wilcox and W. Marion Technical Report NREL/TP-581-43156 Revised May 2008 NREL is operated by Midwest Research Institute ● Battelle Contract No. DE-AC36-99-GO10337 National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy by Midwest Research Institute * Battelle Contract No. DE-AC36-99-GO10337 Technical Report NREL/TP-581-43156 Revised May 2008 Users Manual for TMY3 Data Sets S. Wilcox and W. Marion Prepared under Task No. PVA7.6101 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

7

building load data | OpenEI Community  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL...

8

electric load data | OpenEI Community  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL...

9

commercial load | OpenEI Community  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL...

10

residential load | OpenEI Community  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL...

11

OpenEI Community - load data  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

12

OpenEI Community - electric load data  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

13

OpenEI Community - building load  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

14

OpenEI Community - residential load  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

15

OpenEI Community - commercial load  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

16

OpenEI Community - building load data  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

17

Users Manual for TMY3 Data Sets (Revised)  

DOE Green Energy (OSTI)

This users manual describes how to obtain and interpret the data in the Typical Meteorological Year version 3 (TMY3) data sets. These data sets are an update to the TMY2 data released by NREL in 1994.

Wilcox, S.; Marion, W.

2008-05-01T23:59:59.000Z

18

Commercial and Residential Hourly Load Data Now Available on OpenEI! |  

Open Energy Info (EERE)

Commercial and Residential Hourly Load Data Now Available on OpenEI! Commercial and Residential Hourly Load Data Now Available on OpenEI! Home > Groups > Utility Rate Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL I am pleased to announce that simulated hourly residential and commercial building load datasets are now available on OpenEI. These datasets are available for all TMY3 locations in the United States. They contain hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). In addition to various

19

load data | OpenEI Community  

Open Energy Info (EERE)

51 51 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142234851 Varnish cache server load data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI! building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: application/zip icon System Advisor Model Tool for Downloading Load Data

20

United States | OpenEI Community  

Open Energy Info (EERE)

United States United States Home Graham7781's picture Submitted by Graham7781(1992) Super contributor 16 August, 2013 - 12:21 New report from White House outlines largest problems facing United States energy grid energy grid OpenEI President Smart Grid United States White House Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI! building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: application/zip icon System Advisor Model Tool for Downloading Load Data Graham7781's picture Submitted by Graham7781(1992) Super contributor 29 October, 2012 - 14:46 East Coast Utilities prepare for Hurricane Sandy

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Unit load and material handling considerations in facility layout design  

E-Print Network (OSTI)

Dec 1, 2002 ... In this paper, the integration of unit load and material handling considerations in facility layout design is presented. This integration is based on ...

22

NREL EFM DATA: Disaggregated Residential Load Cost Data The  

Open Energy Info (EERE)

EFM DATA: Disaggregated Residential Load Cost Data The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The...

23

WIPP Mobile Loading Unit Contract - 8-27-12  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Awards Contract for WIPP Mobile Loading Unit Services DOE Awards Contract for WIPP Mobile Loading Unit Services Cincinnati, Ohio, August 27, 2012 - The U.S. Department of Energy (DOE) today awarded a competitive small business contract to Celeritex, LLC, (a Joint Venture between Project Services Group, LLC and DeNuke Contracting Services Inc.) of Suwanee, Georgia. The contract is to provide Mobile Loading Unit services in support of the National TRU Program and the DOE Carlsbad Field Office (CBFO) at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The contract has a value of up to $17.8 million, with a three-year performance period and two- one year extension options. This contract was limited to Small Businesses. The Mobile Loading Unit contractor will load Contact Handled (CH) and Remote Handled (RH)

24

Bubble deaeration of water at reduced unit loads  

Science Conference Proceedings (OSTI)

Whenever the load is reduced, the parameters of the water and steam being introduced into the deaerator, as well as the pressure, also change. A study was conducted to ascertain the reasons for the improvement in water deaeration whenever the unit load is reduced. The study of the deaerator demonstrated that reducing the load on the turbine produces a reduction in the amount of oxygen contained in the feedwater from 25-30 to 8-12 ..mu..g/kg.

Kondrat'ev, A.D.; Kurnyk, L.N.

1982-11-01T23:59:59.000Z

25

Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours Docket No. EO-05-01. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours. Arial photograph showing plant and location of predicted SO2 violations, predicted in 2000. Mirant: Case 67a: Units 3 & 4 & 5 at Max Load for 12 hours and at Min Load for 12 hours More Documents & Publications Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 3, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by AERMOD-PRIME, Units 4, 1, 2 SO2 Case Mirant Potomac, Alexandria, Virginia: Maximum Impacts Predicted by

26

Brief A decomposition approach for the solution of the unit loading problem in hydroplants  

Science Conference Proceedings (OSTI)

This paper presents a decomposition approach for the solution of the dynamic programming formulation of the unit loading problem in hydroplant management. This decomposition approach allows the consideration of network and canal constraints without additional ... Keywords: Decomposition, Dynamic programming, Hydroelectricity, Unit loading problem

MichèLe Breton; Saeb Hachem; Abdelghani Hammadia

2002-03-01T23:59:59.000Z

27

On the operating unit size of load/store architectures†  

Science Conference Proceedings (OSTI)

We introduce a strict version of the concept of a load/store instruction set architecture in the setting of Maurer machines. We take the view that transformations on the states of a Maurer machine are achieved by applying threads as considered in thread ...

J. a. Bergstra; C. a. Middelburg

2010-06-01T23:59:59.000Z

28

Load beam unit replaceable inserts for dry coal extrusion pumps  

Science Conference Proceedings (OSTI)

A track assembly for a particulate material extrusion pump according to an exemplary aspect of the present disclosure includes a link assembly with a roller bearing. An insert mounted to a load beam located such that the roller bearing contacts the insert.

Saunders, Timothy; Brady, John D.

2012-11-13T23:59:59.000Z

29

DOE Awards Contract for WIPP Mobile Loading Unit Services | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIPP Mobile Loading Unit Services WIPP Mobile Loading Unit Services DOE Awards Contract for WIPP Mobile Loading Unit Services August 27, 2012 - 12:00pm Addthis Media Contacts Bill Taylor Bill.Taylor@srs.gov 803-952-8564 Deb Gill Deb.Gill@wipp.ws 575-234-7270 Cincinnati - The U.S. Department of Energy (DOE) today awarded a competitive small business contract to Celeritex, LLC, (a Joint Venture between Project Services Group, LLC and DeNuke Contracting Services Inc.) of Suwanee, Georgia. The contract is to provide Mobile Loading Unit services in support of the National TRU Program and the DOE Carlsbad Field Office (CBFO) at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The contract has a value of up to $17.8 million, with a three-year performance period and two-one year extension options. This contract was limited to

30

Evaluation of concrete masonry unit walls for lateral natural phenomena hazards loads  

Science Conference Proceedings (OSTI)

Older single-story facilities (Pre-1985 vintage) are commonly constructed of structural steel framing with concrete masonry unit (CMU) walls connected to columns and roof girders of the steel framing system. The CMU walls are designed for lateral wind and seismic loads (perpendicular to the wall) and transmit shear loads from the roof diaphragm to the foundation footings. The lateral loads normally govern their design. The structural framing system and the roof diaphragm system are straight forward when analyzing or upgrading the structure for NPH loads. Because of a buildings design vintage, probable use of empirical methodology, and poor design basis documentation (and record retention); it is difficult to qualify or upgrade CMU walls for lateral Natural Phenomena Hazards (NPH) loads in accordance with References 1, 2 and 3. This paper discusses three analytical approaches and/or techniques (empirical, working stress and yield line) to determine the collapse capacity of a laterally loaded CMU wall, and compares their results

Faires, W.E. Jr.

1996-03-08T23:59:59.000Z

31

Update: Effective Load-Carrying Capability of Photovoltaics in the United States; Preprint  

DOE Green Energy (OSTI)

This paper provides an update on the U.S. distribution of effective load-carrying capability (ELLC) for photovoltaics by analyzing recent load data from 39 U.S. utilities and time-coincident output of PV installations simulated from high-resolution, time/site-specific satellite data. Results show that overall regional trends identified in the early 1990s remain pertinent today, while noting a significant increase in PV ELCC in the western and northern United States, and a modest decrease in the central and eastern United States.

Perez, R.; Margolis, R.; Kmiecik, M.; Schwab, M.; Perez, M.

2006-06-01T23:59:59.000Z

32

Microsoft Word - UPDATE 5 - Units 1,2 + base load unit.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 to: 5 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Cycling Units 1, 2 plus One Baseload Unit ENSR Corporation January 6, 2006 Document Number 10350-002-420 (Update 5) January, 2006 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for simultaneous operation of one baseload unit and two cycling units at Mirant's Potomac River Generating Station (PRGS). This mode of operation is also referred to as Option A in Mirant Potomac River LLC's December 30, 2005 letter to the U.S. Department of Energy regarding District of Columbia Public Service Commission, Docket No. EO-05- 01. The modeling was performed according to the Protocol approved by the Virginia Department of

33

OpenEI - energy data  

Open Energy Info (EERE)

http:en.openei.orgdatasetstaxonomyterm1010 en Commercial and Residential Hourly Load Profiles for all TMY3 Locations in the United States http:en.openei.orgdatasetsnode...

34

Part-Load Performance Characterization and Energy Savings Potential of the RTU Challenge Unit: Daikin Rebel  

SciTech Connect

In 2011, the U.S. Department of Energy’s Building Technology Office (DOE’s BTO), with help from the Better Buildings Alliance (BBA) members, developed a specification for high performance rooftop air-conditioning units (RTU Challenge) with capacity ranges between 10 and 20 tons (DOE 2013). Daikin’s Rebel for the first rooftop unit system that was recognized by DOE in May 2012 as meeting the RTU Challenge specifications. This report documents the development of part-load performance curves and its use with EnergyPlus simulation tool to estimate the potential savings from use of Rebel compared to other standard options.

Wang, Weimin; Katipamula, Srinivas

2013-09-30T23:59:59.000Z

35

OpenEI Community - datasets  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

36

OpenEI Community - dataset  

Open Energy Info (EERE)

building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Utility Rate OpenEI Community...

37

Index of /datasets/files/961/pub/COMMERCIAL_LOAD_DATA_E_PLUS...  

Open Energy Info (EERE)

USALAShreveport.Rgnl.AP.722480TMY3 11-Mar-2013 07:43 - DIR USAMABarnstable-Boardman.Poland.AP.725067TMY3 11-Mar-2013 08:48 - DIR USAMABeverly.Muni.AP.725088TMY3...

38

Quad Cities Unit 2 Main Steam Line Acoustic Source Identification and Load Reduction  

SciTech Connect

The Quad Cities Units 1 and 2 have a history of steam line vibration issues. The implementation of an Extended Power Up-rate resulted in significant increases in steam line vibration as well as acoustic loading of the steam dryers, which led to equipment failures and fatigue cracking of the dryers. This paper discusses the results of extensive data collection on the Quad Cities Unit 2 replacement dryer and the Main Steam Lines. This data was taken with the intent of identifying acoustic sources in the steam system. Review of the data confirmed that vortex shedding coupled column resonance in the relief and safety valve stub pipes were the principal sources of large magnitude acoustic loads in the main steam system. Modifications were developed in sub-scale testing to alter the acoustic properties of the valve standpipes and add acoustic damping to the system. The modifications developed and installed consisted of acoustic side branches that were attached to the Electromatic Relief Valve (ERV) and Main Steam Safety Valve (MSSV) attachment pipes. Subsequent post-modification testing was performed in plant to confirm the effectiveness of the modifications. The modifications have been demonstrated to reduce vibration loads at full Extended Power Up-rate (EPU) conditions to levels below those at Original Licensed Thermal Power (OLTP). (authors)

DeBoo, Guy; Ramsden, Kevin; Gesior, Roman [Exelon Nuclear Engineering Department (United States)

2006-07-01T23:59:59.000Z

39

Part load operation and heat recovery optimization in cogeneration units with diesel engines  

Science Conference Proceedings (OSTI)

This paper investigates the optimization possibilities of different co-generation units with diesel engines — especially applied in small and middle-size biogas power plant installations. The first subject of the publication is the analysis of ...

Slawomir Smolen

2008-05-01T23:59:59.000Z

40

NREL EFM DATA: Disaggregated Residential Load Cost Data | OpenEI  

Open Energy Info (EERE)

EFM DATA: Disaggregated Residential Load Cost Data EFM DATA: Disaggregated Residential Load Cost Data Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( http://205.254.135.24/cneaf/electricity/page/eia861.html), e.g. field A14 references "34", which is the EIA Utility ID for the City of Abbeville, South Carolina Utility Company. Within each data set per utility resides different types of equipment, miscellaneous electric load plugs, and appliances found in "common households" given by costs broken out by months. All data within each cell is a floating point number with the metric of dollars/month, e.g. 0.46 equals $0.46/month of interest. Please note: That costs given are only for electricity costs not gas!

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Battery loading device  

SciTech Connect

A battery loading device for loading a power source battery, built in small appliances having a battery loading chamber for selectively loading a number of cylindrical unit batteries or a one body type battery having the same voltage as a number of cylindrical unit batteries, whereby the one body type battery and the battery loading chamber are shaped similarly and asymmetrically in order to prevent the one body type battery from being inserted in the wrong direction.

Phara, T.; Suzuki, M.

1984-08-28T23:59:59.000Z

42

Load cell  

DOE Patents (OSTI)

A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs, each directly proportional to one of the six general load components. 16 figs.

Spletzer, B.L.

1998-12-15T23:59:59.000Z

43

Load cell  

DOE Patents (OSTI)

A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs which can be combined to determine any one of the six general load components.

Spletzer, Barry L. (Albuquerque, NM)

2001-01-01T23:59:59.000Z

44

Load cell  

DOE Patents (OSTI)

A load cell combines the outputs of a plurality of strain gauges to measure components of an applied load. Combination of strain gauge outputs allows measurement of any of six load components without requiring complex machining or mechanical linkages to isolate load components. An example six axis load cell produces six independent analog outputs, each directly proportional to one of the six general load components.

Spletzer, Barry L. (Albuquerque, NM)

1998-01-01T23:59:59.000Z

45

Load Control  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Visualization and Controls Peer Review Visualization and Controls Peer Review Load Control for System Reliability and Measurement-Based Stability Assessment Dan Trudnowski, PhD, PE Montana Tech Butte, MT 59701 dtrudnowski@mtech.edu 406-496-4681 October 2006 2 Presentation Outline * Introduction - Goals, Enabling technologies, Overview * Load Control - Activities, Status * Stability Assessment - Activities, Status * Wrap up - Related activities, Staff 3 Goals * Research and develop technologies to improve T&D reliability * Technologies - Real-time load control methodologies - Measurement-based stability-assessment 4 Enabling Technologies * Load control enabled by GridWise technology (e.g. PNNL's GridFriendly appliance) * Real-time stability assessment enabled by Phasor Measurement (PMU) technology 5 Project Overview * Time line: April 18, 2006 thru April 17, 2008

46

LOADING DEVICE  

DOE Patents (OSTI)

A device is presented for loading or charging bodies of fissionable material into a reactor. This device consists of a car, mounted on tracks, into which the fissionable materials may be placed at a remote area, transported to the reactor, and inserted without danger to the operating personnel. The car has mounted on it a heavily shielded magazine for holding a number of the radioactive bodies. The magazine is of a U-shaped configuration and is inclined to the horizontal plane, with a cap covering the elevated open end, and a remotely operated plunger at the lower, closed end. After the fissionable bodies are loaded in the magazine and transported to the reactor, the plunger inserts the body at the lower end of the magazine into the reactor, then is withdrawn, thereby allowing gravity to roll the remaining bodies into position for successive loading in a similar manner.

Ohlinger, L.A.

1958-10-01T23:59:59.000Z

47

Combustion Impacts of Flexible Operation: Low Load, Load Following, and Increased Staging Impact on Boiler Tubes  

Science Conference Proceedings (OSTI)

Over the past few years, coal-fired generating units have changed from stable base load operation to flexible operation, including periods of prolonged low-load operation. These changes in operation can have various adverse effects on all plant equipment, particularly in older units and may impact their ability to operate without tube failures due to elevated levels of fireside corrosion and circumferential cracking. This report discusses the combustion-related impacts of low-load, load-following, ...

2013-12-23T23:59:59.000Z

48

LOADED WAVEGUIDES  

DOE Patents (OSTI)

>Loaded waveguides are described for the propagation of electromagnetic waves with reduced phase velocities. A rectangular waveguide is dimensioned so as to cut-off the simple H/sub 01/ mode at the operating frequency. The waveguide is capacitance loaded, so as to reduce the phase velocity of the transmitted wave, by connecting an electrical conductor between directly opposite points in the major median plane on the narrower pair of waveguide walls. This conductor may take a corrugated shape or be an aperature member, the important factor being that the electrical length of the conductor is greater than one-half wavelength at the operating frequency. Prepared for the Second U.N. International ConferThe importance of nuclear standards is duscussed. A brief review of the international callaboration in this field is given. The proposal is made to let the International Organization for Standardization (ISO) coordinate the efforts from other groups. (W.D.M.)

Mullett, L.B.; Loach, B.G.; Adams, G.L.

1958-06-24T23:59:59.000Z

49

Buildings Stock Load Control  

E-Print Network (OSTI)

Researchers and practitioners have proposed a variety of solutions to reduce electricity consumption and curtail peak demand. This research focuses on electricity demand control by applying some strategies in existing building to reduce it during the extreme climate period. The first part of this paper presents the objectives of the study: ? to restrict the startup polluting manufacturing units (power station), ? to limit the environmental impacts (greenhouse emission), ? to reduce the transport and distribution electricity infrastructures The second part presents the approach used to rise the objectives : ? To aggregat the individual loads and to analyze the impact of different strategies from load shedding to reduce peak power demand by: ? Developing models of tertiary buildings stocks (Schools, offices, Shops, hotels); ? Making simulations for different load shedding strategies to calculate potential peak power saving. The third part is dedicated to the description of the developed models: An assembly of the various blocks of the library of simbad and simulink permit to model building. Finally the last part prensents the study results: Graphs and tables to see the load shedding strategies impacts.

Joutey, H. A.; Vaezi-Nejad, H.; Clemoncon, B.; Rosenstein, F.

2006-01-01T23:59:59.000Z

50

Printed in the United States of America. Available from National Technical Information Service  

E-Print Network (OSTI)

. Neither the United States nor the Energy Research and Development Administration/United States Nuclear loading ................... 8 4 Yearly heating loads and energy consumption for six cities

Oak Ridge National Laboratory

51

Unit Conversion  

Science Conference Proceedings (OSTI)

Unit Conversion. ... Unit Conversion Example. "If you have an amount of unit of A, how much is that in unit B?"; Dimensional Analysis; ...

2012-12-04T23:59:59.000Z

52

Periodic load balancing  

Science Conference Proceedings (OSTI)

Multiprocessor load balancing aims to improve performance by moving jobs from highly loaded processors to more lightly loaded processors. Some schemes allow only migration of new jobs upon arrival, while other schemes allow migration of ... Keywords: heavy traffic diffusion approximations, load balancing, periodic load balancing, reflected Brownian motion, resource sharing, transient behavior

Gísli Hjálmtýsson; Ward Whitt

1998-06-01T23:59:59.000Z

53

united stadium. united station.  

E-Print Network (OSTI)

??DC United is one of Major League Soccerâs most decorated franchises, yet it still plays its home games within the crumbling confines of RFK Stadium.… (more)

Groff, David R.

2011-01-01T23:59:59.000Z

54

Characterizing Household Plug Loads through Self-Administered Load Research  

Science Conference Proceedings (OSTI)

Household miscellaneous loads, which include consumer electronics, are the fastest growing segment of household energy use in the United States. Although the relative energy intensity of applications such as heating and cooling is declining, the DOEAnnual Energy Outlook forecasts that the intensity of residential miscellaneous end uses will increase substantially by 2030. Studies by TIAX and Ecos Consulting reveal that miscellaneous devices8212smaller devices in terms of energy draw but growing in usage8...

2009-12-09T23:59:59.000Z

55

On Load Balancing in a Dense Wireless  

E-Print Network (OSTI)

We study the load balancing problem in a dense wireless multihop network, where a typical path consists of large number of hops, i.e., the spatial scales of a typical distance between source and destination, and mean distance between the neighbouring nodes are strongly separated. In this limit, we present a general framework for analysing the traffic load resulting from a given set of paths and traffic demands. We formulate the load balancing problem as a minmax problem and give two lower bounds for the achievable minimal maximum traffic load. The framework is illustrated by an example of uniformly distributed traffic demands in a unit disk with a few families of paths given in advance. With these paths we are able to decrease the maximum traffic load by factor of 33 40% depending on the assumptions. The obtained traffic load level also comes quite near the tightest lower bound.

Multihop Network Esa; Esa Hyytiä

2006-01-01T23:59:59.000Z

56

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

composition: The total load profile obtained from  load individual load types if  load profiles of individual load composition validation: Load profiles generated by the load 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

57

An Evaluation of the HVAC Load Potential for Providing Load Balancing Service  

Science Conference Proceedings (OSTI)

This paper investigates the potential of providing aggregated intra-hour load balancing services using heating, ventilating, and air-conditioning (HVAC) systems. A direct-load control algorithm is presented. A temperature-priority-list method is used to dispatch the HVAC loads optimally to maintain consumer-desired indoor temperatures and load diversity. Realistic intra-hour load balancing signals were used to evaluate the operational characteristics of the HVAC load under different outdoor temperature profiles and different indoor temperature settings. The number of HVAC units needed is also investigated. Modeling results suggest that the number of HVACs needed to provide a {+-}1-MW load balancing service 24 hours a day varies significantly with baseline settings, high and low temperature settings, and the outdoor temperatures. The results demonstrate that the intra-hour load balancing service provided by HVAC loads meet the performance requirements and can become a major source of revenue for load-serving entities where the smart grid infrastructure enables direct load control over the HAVC loads.

Lu, Ning

2012-09-30T23:59:59.000Z

58

Load sensing system  

DOE Patents (OSTI)

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast

Sohns, Carl W. (Oak Ridge, TN); Nodine, Robert N. (Knoxville, TN); Wallace, Steven Allen (Knoxville, TN)

1999-01-01T23:59:59.000Z

59

A fuzzy logic based approach to direct load control  

SciTech Connect

Demand side management programs are strategies designed to alter the shape of the load curve. In order to successfully implement such a strategy, customer acceptance of the program is vital. It is thus desirable to design a model for direct load control which may accommodate customer preferences. This paper presents a methodology for optimizing both customer satisfaction and utility unit commitment savings, based on a fuzzy load model for the direct load control of appliances.

Bhattacharyya, K.; Crow, M.L. [Univ. of Missouri, Rolla, MO (United States). Dept. of Electrical Engineering

1996-05-01T23:59:59.000Z

60

Discharge circuits and loads  

SciTech Connect

This will be an overview in which some of the general properties of loads are examined: their interface with the energy storage and switching devices; general problems encountered with different types of loads; how load behavior and fault modes can impact on the design of a power conditioning system (PCS).

Sarjeant, W.J.

1980-10-15T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Legend Units  

Science Conference Proceedings (OSTI)

... Syntax: LEGEND UNIT units> where is an integer number or parameter in the range 1 to 100 that specifies the legend identifier; and ...

2013-11-27T23:59:59.000Z

62

G&T adds versatile load management system  

SciTech Connect

Wolverine`s load management system was designed in response to the need to reduce peak demand. The Energy Management System (EMS) prepares short term (seven day) load forecasts, based on a daily peak demand forecst, augmented by a similar day profile based on weather conditions. The software combines the similar day profile with the daily peak demand forecast to yield an hourly load forecast for an entire week. The software uses the accepted load forecast case in many application functions, including interchange scheduling, unit commitment, and transaction evaluation. In real time, the computer updates the accepted forecast hourly, based in actual changes in the weather and load. The load management program executes hourly. The program uses impact curves to calculate a load management strategy that reduces the load forecast below a desired load threshold.

Nickel, J.R.; Baker, E.D.; Holt, J.W.; Chan, M.L.

1995-04-01T23:59:59.000Z

63

Load sensing system  

DOE Patents (OSTI)

A load sensing system inexpensively monitors the weight and temperature of stored nuclear material for long periods of time in widely variable environments. The system can include an electrostatic load cell that encodes weight and temperature into a digital signal which is sent to a remote monitor via a coaxial cable. The same cable is used to supply the load cell with power. When multiple load cells are used, vast inventories of stored nuclear material can be continuously monitored and inventoried of minimal cost. 4 figs.

Sohns, C.W.; Nodine, R.N.; Wallace, S.A.

1999-05-04T23:59:59.000Z

64

Structural load combinations  

SciTech Connect

This paper presents the latest results of the program entitled, ''Probability Based Load Combinations For Design of Category I Structures''. In FY 85, a probability-based reliability analysis method has been developed to evaluate safety of shear wall structures. The shear walls are analyzed using stick models with beam elements and may be subjected to dead load, live load and in-plane eqrthquake. Both shear and flexure limit states are defined analytically. The limit state probabilities can be evaluated on the basis of these limit states. Utilizing the reliability analysis method mentioned above, load combinations for the design of shear wall structures have been established. The proposed design criteria are in the load and resistance factor design (LRFD) format. In this study, the resistance factors for shear and flexure and load factors for dead and live loads are preassigned, while the load factor for SSE is determined for a specified target limit state probability of 1.0 x 10/sup -6/ or 1.0 x 10/sup -5/ during a lifetime of 40 years. 23 refs., 9 tabs.

Hwang, H.; Reich, M.; Ellingwood, B.; Shinozuka, M.

1985-01-01T23:59:59.000Z

65

Watershed Mercury Loading Framework  

Science Conference Proceedings (OSTI)

This report explains and illustrates a simplified stochastic framework, the Watershed Mercury Loading Framework, for organizing and framing site-specific knowledge and information on mercury loading to waterbodies. The framework permits explicit treatment of data uncertainties. This report will be useful to EPRI members, state and federal regulatory agencies, and watershed stakeholders concerned with mercury-related human and ecological health risk.

2003-05-23T23:59:59.000Z

66

load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

67

Load-management decision  

Science Conference Proceedings (OSTI)

Utilities require baseload, intermediate, and peaking plants to meet fluctuating customer demand. These can be supplemented with off-peak generation and storage and load management, which can take the form of direct utility control over interruptible and deferrable customers or customer incentives that require off-peak demand. Utilities should make a careful analysis of their load profile, their generation mix, their ability to shift loads, and customer attitudes before deciding on a load-management program that fits their individual needs. They should also be aware that load management is only a limited resource with a number of uncertainties. Research programs into customer relations, system reliability, communications devices, and special control switches and meters will help to relieve some of the uncertainties. (DCK)

Lihach, N.; Gupta, P.

1982-05-01T23:59:59.000Z

68

Dynamic Response Analysis of Underground Powerhouse Structures Considering Coupling Effects of Hydraulic Impulse and Dynamic Loads  

Science Conference Proceedings (OSTI)

When accident takes place in hydropower generator units, they transit from normal working condition to accident working condition. During this period, the generator pier structures bear coupling effect of dynamic load from the units and hydraulic impulse ... Keywords: underground powerhouse structure, unit dynamic load, hydraulic impulse, coupling effect, dynamic analysis

Li Xiaoli; Yuan Chaoqing; Li Ke; Li Yujie

2012-05-01T23:59:59.000Z

69

Investigation of wind induced load on guyline anchors  

SciTech Connect

Most producing oil wells in the United States include guyline anchors to provide structural support for wind loaded service derricks. Recent safety regulations have focused attention on the load transferred to these anchors during high wind, but no definitive data has been available to establish precise requirements for such loading. In order to provide accurate and broadly acceptable data, a full scale field study was conducted on an actual servicing unit subject to severe wind. Load measured on the guyline anchors during the test indicates that there is less load on the guylines than standard criteria would predict. This result seems to be a singular property of oil well servicing units and is probably associated with both the flowfield around the derrick and the vertical velocity profile of the wind.

Hoyt, P.M.

1976-01-01T23:59:59.000Z

70

data | OpenEI Community  

Open Energy Info (EERE)

data data Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 12:03 Commercial and Residential Hourly Load Data Now Available on OpenEI! building load building load data commercial load data dataset datasets electric load data load data load profile OpenEI residential load TMY3 United States Load data Image source: NREL Files: application/zip icon System Advisor Model Tool for Downloading Load Data Graham7781's picture Submitted by Graham7781(1992) Super contributor 15 March, 2013 - 10:23 Quarterly Smart Grid Data available for download on OpenEI data download OpenEI quarterly Smart Grid Smartgrid.gov SmartGrid.gov is a resource for information about the Smart Grid and government-sponsored Smart Grid projects. The information on SmartGrid.gov helps consumers and stakeholders understand the basics of a Smart Grid, and

71

English Units  

Science Conference Proceedings (OSTI)

English Units. A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: English Units, ... 6, Height of steam point apparatus above ground (ft.), 0, ft. ...

2011-12-22T23:59:59.000Z

72

Unit Conversions  

Science Conference Proceedings (OSTI)

... volume flow units, which contain "atm", assume that the gas is: ideal; at a pressure of 101325 Pa; at a temperature of 0 °C. Be aware that the unit "atm ...

2012-10-02T23:59:59.000Z

73

Characterizing Highly Varying Loads Associated With the Steel Industry  

Science Conference Proceedings (OSTI)

This study examines the quality of power and the effects of the highly varying load on automatic generation control at a utility service territory that contains 22% of the United States' steel manufacturing capability.

2003-12-31T23:59:59.000Z

74

Energy efficiency indicators for high electric-load buildings  

Science Conference Proceedings (OSTI)

Energy per unit of floor area is not an adequate indicator for energy efficiency in high electric-load buildings. For two activities, restaurants and computer centres, alternative indicators for energy efficiency are discussed.

Aebischer, Bernard; Balmer, Markus A.; Kinney, Satkartar; Le Strat, Pascale; Shibata, Yoshiaki; Varone, Frederic

2003-06-01T23:59:59.000Z

75

The Temperature Sensitivity of the Residential Load and Commercial Building Load  

SciTech Connect

This paper presents a building modeling approach to quickly quantify climate change impacts on energy consumption, peak load, and load composition of residential and commercial buildings. This research focuses on addressing the impact of temperature changes on the building heating and cooling load in 10 major cities across the Western United States and Canada. A building simulation software are first used to quantify the hourly energy consumption of different building types by end-use and by vintage. Then, the temperature sensitivities are derived based on the climate data inputs.

Lu, Ning; Taylor, Zachary T.; Jiang, Wei; Correia, James; Leung, Lai R.; Wong, Pak C.

2009-07-26T23:59:59.000Z

76

OpenEI - Residential  

Open Energy Info (EERE)

Commercial and Commercial and Residential Hourly Load Profiles for all TMY3 Locations in the United States http://en.openei.org/datasets/node/961 This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols).  This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types

77

OpenEI - Energy Consumption  

Open Energy Info (EERE)

Commercial and Commercial and Residential Hourly Load Profiles for all TMY3 Locations in the United States http://en.openei.org/datasets/node/961 This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols).  This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types

78

Using DER in Transmission-Constrained Urban Load Pockets  

Science Conference Proceedings (OSTI)

Urban load centers are characterized by their dense population, environmental constraints, as well as transmission-constrained electricity delivery. They also have potentially high infrastructure investment costs for distribution system investments to meet peak load growth. This report looks at seven areas in the United States that have been identified as transmission-constrained load pockets, focusing on opportunities for using distributed energy resources (DER).

2007-12-17T23:59:59.000Z

79

HLW Glass Waste Loadings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HLW HLW Glass Waste Loadings Ian L. Pegg Vitreous State Laboratory The Catholic University of America Washington, DC Overview Overview  Vitrification - general background  Joule heated ceramic melter (JHCM) technology  Factors affecting waste loadings  Waste loading requirements and projections  WTP DWPF  DWPF  Yucca Mountain License Application requirements on waste loading  Summary Vitrification  Immobilization of waste by conversion into a glass  Internationally accepted treatment for HLW  Why glass?  Amorphous material - able to incorporate a wide spectrum of elements over wide ranges of composition; resistant to radiation damage  Long-term durability - natural analogs Relatively simple process - amenable to nuclearization at large  Relatively simple process - amenable to nuclearization at large scale  There

80

OpenEI - load  

Open Energy Info (EERE)

are given by a location defined by the Typical Meteorological Year (TMY) for which the weather data was collected. Commercial load data is sorted by the (TMY) site as a...

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Composite Load Model Evaluation  

Science Conference Proceedings (OSTI)

The WECC load modeling task force has dedicated its effort in the past few years to develop a composite load model that can represent behaviors of different end-user components. The modeling structure of the composite load model is recommended by the WECC load modeling task force. GE Energy has implemented this composite load model with a new function CMPLDW in its power system simulation software package, PSLF. For the last several years, Bonneville Power Administration (BPA) has taken the lead and collaborated with GE Energy to develop the new composite load model. Pacific Northwest National Laboratory (PNNL) and BPA joint force and conducted the evaluation of the CMPLDW and test its parameter settings to make sure that: • the model initializes properly, • all the parameter settings are functioning, and • the simulation results are as expected. The PNNL effort focused on testing the CMPLDW in a 4-bus system. An exhaustive testing on each parameter setting has been performed to guarantee each setting works. This report is a summary of the PNNL testing results and conclusions.

Lu, Ning; Qiao, Hong (Amy)

2007-09-30T23:59:59.000Z

82

A new method for stochastic production simulation in generation system with multiple hydro units  

SciTech Connect

This paper describes a new method of calculating loss of load probability, expected energy generation and production cost for units in a generating system with multiple hydro units. The method uses the equivalent load duration curve (ELDC) obtained by convolving the distributions of the original load and the forced outage power loss of all generators. Hydro units are scheduled on the ELDC according to their assigned energy and available capacity. Then the deconvolution procedure is performed to obtain a load duration curve for an equivalent system without hydro units. The expected energy of the thermal units is achieved by convolving the generating units in an economic merit order of loading.

Chen, S.J.

1988-06-01T23:59:59.000Z

83

Demand-Side Response from Industrial Loads  

Science Conference Proceedings (OSTI)

Through a research study funded by the Department of Energy, Smart Grid solutions company ENBALA Power Networks along with the Oak Ridge National Laboratory (ORNL) have geospatially quantified the potential flexibility within industrial loads to leverage their inherent process storage to help support the management of the electricity grid. The study found that there is an excess of 12 GW of demand-side load flexibility available in a select list of top industrial facilities in the United States. Future studies will expand on this quantity of flexibility as more in-depth analysis of different industries is conducted and demonstrations are completed.

Starke, Michael R [ORNL; Alkadi, Nasr E [ORNL; Letto, Daryl [Enbala Power Networks; Johnson, Brandon [University of Tennessee, Knoxville (UTK); Dowling, Kevin [University of Tennessee, Knoxville (UTK); George, Raoule [Enbala Power Networks; Khan, Saqib [University of Texas, Austin

2013-01-01T23:59:59.000Z

84

Analysis of industrial load management  

SciTech Connect

Industrial Load Management, ILM, has increased the possibilities of changing load profiles and raising load factors. This paper reports on load profile measurements and feasible load management applications that could be implemented in industry e.g. bivalent systems for heating of premises and processes, load priority systems, energy storage and rescheduling processes or parts of processes due to differential electricity rates. Industrial load variations on hourly, daily and seasonal basis are treated as well as the impact by load management on load curves e g peak clipping, valley filling and increased off-peak electricity usage.

Bjork, C.O.; Karlsson, B.G.

1986-04-01T23:59:59.000Z

85

Distribution substation load impacts of residential air conditioner load control  

SciTech Connect

An ongoing experiment to monitor the substation level load impacts of end-use load control is described. An overview of the data acquisition system, experimental procedures and analysis techniques are provided. Results of the 1983 and 1984 experiments demonstrate the value of aggregate load impact monitoring as a means of verifying load research results, calculating the diversity of end-use loads, and predicting the impacts of load management on the transmission and distribution systems.

Heffner, G.C.; Kaufman, D.A.

1985-07-01T23:59:59.000Z

86

Building Energy Software Tools Directory: QwickLoad  

NLE Websites -- All DOE Office Websites (Extended Search)

QwickLoad QwickLoad QwickLoad logo QwickLoad uses the ASHRAE TFM (Transfer Function Method) algorithms combined with a screen interface that provides building load calculations. It includes a Duct Sizing Program and supports IP and SI units. QwickLoad Residential 7.0 provides heat gain and heat loss calculations for up to 10 zones. QwickLoad Commercial 7.0 provides heat gain and heat loss calculations for up to 500 zones. Zones and plenums can be added or deleted with one button click. Intuitive screens for entering building information. Default is automatically displayed. Construction types for roofs, walls, partitions, windows, shade types, and scheduling control. Complete air-conditioning and heating system control and supply, return, heating and cooling duct static pressure specification. Energy recovery ventilator can

87

Load Monitoring CEC/LMTF Load Research Program  

SciTech Connect

This white paper addresses the needs, options, current practices of load monitoring. Recommendations on load monitoring applications and future directions are also presented.

Huang, Zhenyu; Lesieutre, B.; Yang, Steve; Ellis, A.; Meklin, A.; Wong, B.; Gaikwad, A.; Brooks, D.; Hammerstrom, Donald J.; Phillips, John; Kosterev, Dmitry; Hoffman, M.; Ciniglio, O.; Hartwell, R.; Pourbeik, P.; Maitra, A.; Lu, Ning

2007-11-30T23:59:59.000Z

88

Loads Providing Ancillary Services: Review of International Experience  

SciTech Connect

In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that customer loads can meaningfully participate in all wholesale electricity markets.

Heffner, Grayson; Goldman, Charles; Kintner-Meyer, Michael

2007-05-01T23:59:59.000Z

89

Boron loaded scintillator  

DOE Patents (OSTI)

A scintillating composition for detecting neutrons and other radiation comprises a phenyl containing silicone rubber with carborane units and at least one phosphor molecule. The carborane units can either be a carborane molecule dispersed in the rubber with the aid of a compatiblization agent or can be covalently bound to the silicone.

Bell, Zane William (Oak Ridge, TN); Brown, Gilbert Morris (Knoxville, TN); Maya, Leon (Knoxville, TN); Sloop, Jr., Frederick Victor (Oak Ridge, TN)

2009-10-20T23:59:59.000Z

90

Mass-Loaded Flows  

E-Print Network (OSTI)

A key process within astronomy is the exchange of mass, momentum, and energy between diffuse plasmas in many types of astronomical sources (including planetary nebulae, wind-blown bubbles, supernova remnants, starburst superwinds, and the intracluster medium) and dense, embedded clouds or clumps. This transfer affects the large scale flows of the diffuse plasmas as well as the evolution of the clumps. I review our current understanding of mass-injection processes, and examine intermediate-scale structure and the global effect of mass-loading on a flow. I then discuss mass-loading in a variety of diffuse sources.

J. M. Pittard

2006-07-13T23:59:59.000Z

91

Loads Providing Ancillary Services: Review of International Experience |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loads Providing Ancillary Services: Review of International Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that

92

Loads Providing Ancillary Services: Review of International Experience |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loads Providing Ancillary Services: Review of International Loads Providing Ancillary Services: Review of International Experience Loads Providing Ancillary Services: Review of International Experience In this study, we examine the arrangements for and experiences of end-use loads providing ancillary services (AS) in five electricity markets: Australia, the United Kingdom (UK), the Nordic market, and the ERCOT and PJM markets in the United States. Our objective in undertaking this review of international experience was to identify specific approaches or market designs that have enabled customer loads to effectively deliver various ancillary services (AS) products. We hope that this report will contribute to the ongoing discussion in the U.S. and elsewhere regarding what institutional and technical developments are needed to ensure that

93

Microprocessor-controlled photovoltaic-array loading unit  

DOE Green Energy (OSTI)

Described is a microprocessor-controlled test system in operation at the Photovoltaics Advanced Systems Test Facility located at Sandia National Laboratories. The test system is designed to measure the total energy output of photovoltaic arrays. The theory, installation, operation, and calibration of the test system are described.

Russell, D.F.

1982-08-01T23:59:59.000Z

94

Cooling load estimation methods  

DOE Green Energy (OSTI)

Ongoing research on quantifying the cooling loads in residential buildings, particularly buildings with passive solar heating systems, is described. Correlations are described that permit auxiliary cooling estimates from monthly average insolation and weather data. The objective of the research is to develop a simple analysis method, useful early in design, to estimate the annual cooling energy required of a given building.

McFarland, R.D.

1984-01-01T23:59:59.000Z

95

Multidimensional spectral load balancing  

DOE Patents (OSTI)

A method of and apparatus for graph partitioning involving the use of a plurality of eigenvectors of the Laplacian matrix of the graph of the problem for which load balancing is desired. The invention is particularly useful for optimizing parallel computer processing of a problem and for minimizing total pathway lengths of integrated circuits in the design stage.

Hendrickson, Bruce A. (Albuquerque, NM); Leland, Robert W. (Albuquerque, NM)

1996-12-24T23:59:59.000Z

96

LOADING AND UNLOADING DEVICE  

DOE Patents (OSTI)

A device for loading and unloading fuel rods into and from a reactor tank through an access hole includes parallel links carrying a gripper. These links enable the gripper to go through the access hole and then to be moved laterally from the axis of the access hole to the various locations of the fuel rods in the reactor tank.

Treshow, M.

1960-08-16T23:59:59.000Z

97

United States  

Office of Legacy Management (LM)

- I - I United States Department of Energy D lSCk Al M E R "This book was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency

98

Metric Units  

Science Conference Proceedings (OSTI)

... A, B, C, D, E, F, G, H, I, J. 1, Steam Point Calculator: Metric Units, Elevation Converter, ... 6, Height of steam point apparatus above ground (m), 0, m, ...

2011-12-22T23:59:59.000Z

99

UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

Menxmmhmz 9 Menxmmhmz 9 1 / UNITED STATES GOVERNMENT i TO : ThcFFles . mx.f I A. B. Piccct, +3lation section : DATE: .@.eti 16, 1949 SUBJECT: VISIT To HAVY OFfDHAlfCE DEPOT, EARIZ, B.J. FmmlTo ,sYmOL: DH:ARP . . : OnJuly 8,&g the uriterattendedameeting at the Navy Oxdnce Depot at Farle, Ii. J. for the purpose of advising the navy on i-adlatlon hazards involved In the dmping of contadnated AEC wastes at /?ea. " Presint were: J. Cook - Traffic & Transportation, AEC ~J.Moren- Utilifation, AEC ..J. Ccnmigl.io - Chief of Middlesex Operaticns A. PIhot -~Hadiation Section, AEC Captain Blossoin - Navy Captain hall - Navy ThefoSkndngwas agreedupcmby AFC andthe l&v. 1. 2. 3. 4. Contaminatedmaterial dnmied, I (loose in case of large contaminated units) loaded on truck&and lsonltored at'

100

Load Capacity of Bodies  

E-Print Network (OSTI)

For the stress analysis in a plastic body $\\Omega$, we prove that there exists a maximal positive number $C$, the \\emph{load capacity ratio,} such that the body will not collapse under any external traction field $t$ bounded by $Y_{0}C$, where $Y_0$ is the elastic limit. The load capacity ratio depends only on the geometry of the body and is given by $$ \\frac{1}{C}=\\sup_{w\\in LD(\\Omega)_D} \\frac{\\int_{\\partial\\Omega}|w|dA} {\\int_{\\Omega}|\\epsilon(w)|dV}=\\left\\|\\gamma_D\\right\\|. $$ Here, $LD(\\Omega)_D$ is the space of isochoric vector fields $w$ for which the corresponding stretchings $\\epsilon(w)$ are assumed to be integrable and $\\gamma_D$ is the trace mapping assigning the boundary value $\\gamma_D(w)$ to any $w\\in LD(\\Omega)_D$.

Reuven Segev

2005-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Load responsive hydrodynamic bearing  

Science Conference Proceedings (OSTI)

A load responsive hydrodynamic bearing is provided in the form of a thrust bearing or journal bearing for supporting, guiding and lubricating a relatively rotatable member to minimize wear thereof responsive to relative rotation under severe load. In the space between spaced relatively rotatable members and in the presence of a liquid or grease lubricant, one or more continuous ring shaped integral generally circular bearing bodies each define at least one dynamic surface and a plurality of support regions. Each of the support regions defines a static surface which is oriented in generally opposed relation with the dynamic surface for contact with one of the relatively rotatable members. A plurality of flexing regions are defined by the generally circular body of the bearing and are integral with and located between adjacent support regions. Each of the flexing regions has a first beam-like element being connected by an integral flexible hinge with one of the support regions and a second beam-like element having an integral flexible hinge connection with an adjacent support region. A least one local weakening geometry of the flexing region is located intermediate the first and second beam-like elements. In response to application of load from one of the relatively rotatable elements to the bearing, the beam-like elements and the local weakening geometry become flexed, causing the dynamic surface to deform and establish a hydrodynamic geometry for wedging lubricant into the dynamic interface.

Kalsi, Manmohan S. (Houston, TX); Somogyi, Dezso (Sugar Land, TX); Dietle, Lannie L. (Stafford, TX)

2002-01-01T23:59:59.000Z

102

Dynamic model of power system operation incorporating load control  

SciTech Connect

Load management has been proposed as a means whereby an electric utility can reduce its requirements for additional generation, transmission, and distribution investments, shift fuel dependency from limited to more abundant energy resources, and improve the efficiency of the electric energy system. There exist, however, serious technological and economic questions which must be answered to define the cost trade-offs between initiating a load management strategy or adding additional capacity to meet the load. One aspect of this complex problem is to determine how the load profile might be modified by the load management option being considered. Towards this end, a model has been developed to determine how a power system with an active load control system should be operated to make the best use of its available resources. The model is capable of handling all types of conventional generating sources including thermal, hydro, and pumped storage units, and most appliances being considered for direct control including those with inherent or designed storage characteristics. The model uses a dynamic programming technique to determine the optimal operating strategy for a given set of conditions. The use of the model is demonstrated. Case study results indicate that the production cost savings that can be achieved through the use of direct load control are highly dependent on utility characteristics, load characteristics, storage capacity, and penetration. The load characteristics that produce the greatest savings are: large storage capacity; high coincidence with the system peak; large connected load per point; and moderately high diversity fraction.

Kuliasha, M.A.

1980-10-01T23:59:59.000Z

103

United States  

Office of Legacy Management (LM)

Office of Research and EPA 600/R-941209 Environmental Protection Development January 1993 Agency Washington, DC 20460 Offsite Environmental 57,,7 Monitoring Report Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1992 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY OFFICE OF RESEARCH AND DEVELOPMENT ENVIRONMENTAL MONITORING SYSTEMS LABORATORY-LAS VEGAS P.O. BOX 93478 LAS VEGAS. NEVADA 891 93-3478 702/798-2100 Dear Reader: Since 1954, the U.S. Environmental Protection Agency (EPA) and its predecessor the U.S, Public Health Service (PHs) has conducted radiological monitoring in the offsite areas around United States nuclear test areas. The primary objective of this monitoring has been the protection of the health and safety of

104

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BP Energy Company BP Energy Company OE Docket No. EA- 3 14 Order Authorizing Electricity Exports to Mexico Order No. EA-3 14 February 22,2007 BP Energy Company Order No. EA-314 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(Q of the Department of Energy Organization Act (42 U.S.C. 7 15 l(b), 7172(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.S24a(e)) . On May 22,2006, BP Energy Company (BP Energy) applied to DOE for an authorization to transmit electric energy from the United States to Mexico as a power marketer. BP Energy proposes to purchase surplus electric energy from electric utilities and other suppliers within the United States and to export that energy to ~Mexico. The cnergy

105

Miscellaneous and Electronic Loads Energy Efficiency Opportunities for  

NLE Websites -- All DOE Office Websites (Extended Search)

Miscellaneous and Electronic Loads Energy Efficiency Opportunities for Miscellaneous and Electronic Loads Energy Efficiency Opportunities for Commercial Buildings: A Collaborative Study by the United States and India Title Miscellaneous and Electronic Loads Energy Efficiency Opportunities for Commercial Buildings: A Collaborative Study by the United States and India Publication Type Report Refereed Designation Unknown LBNL Report Number LBNL-6287E Year of Publication 2013 Authors Ghatikar, Girish, Iris H. Y. Cheung, and Steven Lanzisera Secondary Authors Wardell, Bob, Manoj Deshpande, Jayraj Ugarkar, and Infosys Technologies Limited Date Published 04/2013 Keywords Electronic loads, energy efficiency opportunities for commercial buildings Short Title MELs Refereed Designation Unknown Attachment Size PDF 1.44 MB Google Scholar BibTex

106

Variable loading roller  

DOE Patents (OSTI)

An automatic loading roller for transmitting torque in traction drive devices in manipulator arm joints includes a two-part camming device having a first cam portion rotatable in place on a shaft by an input torque and a second cam portion coaxially rotatable and translatable having a rotating drive surface thereon for engaging the driven surface of an output roller with a resultant force proportional to the torque transmitted. Complementary helical grooves in the respective cam portions interconnected through ball bearings interacting with those grooves effect the rotation and translation of the second cam portion in response to rotation of the first. 14 figs.

Williams, D.M.

1988-01-21T23:59:59.000Z

107

PEV-based Reactive Power Compensation for Wind DG Units: A Stackelberg Game Approach  

E-Print Network (OSTI)

turbine's inductive load to ensure a stable voltage profile in the system. Since reactive power can only from the load centers, DG units will speed up the revolution of providing power on site with little unit. Reactive power compensa- tion is needed since the load is not pure resistive and may include

Wu, Chenye

108

United States  

Office of Legacy Management (LM)

WASHINGTON, TUESDAY, JUNE 28, 1983 @nngmeional Ruord United States of America .__ -- . . ,- PROCEEDINGS AND DEBATES OF THE 9@ CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmgton, D C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $xX Congresstonal Record (USPS 087-390) Postage and Fees Pad U S Government Prlnhng 0ffv.X 375 SECOND CLASS NEWSPAPER H.4578 ' C.QNGRESSIONAL RECORD - HOUSE June 28, 1983 H.J. Res. 273: Mr. BOUND. Mr. W~.XMAN. Mr. OBERSTAR, Mr. BEDELL. Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB, Mr. CONTE. Mr. RAHALL; Mr. GRAY, Mr. VANDER JACT. Mr. TRAKLER, and Mr. Vxrrro. H. Con. Res. 107: Mr. KASICH. Mr. AUCOIN. Mr. CARPER, and Mr. SIZHFIJER. H. Con. Res. 118: Mr. FISH. Mr. LANTOS.

109

United States  

Office of Legacy Management (LM)

ongrees;ional Record ongrees;ional Record United States of America __._ -.. I. :- PROCEEDINGS AND DEBATES OF THE 9tth CONGRESS, FIRST SESSION United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmcqton. Cl C 20402 OFFICIAL BUSINESS Penalty Ior pwate use. $300 Congressmal Record (USPS 087-390) Postage and Fees Pad U S Governme3n:jPnntmg OfIce SECOND CLASS NEWSPAPER H.4578 ' June 28, 1983 -: I H.J. Res. 273: Mr. BOLAND, Mr. WA-. Mr. OBERSTAFC, M' r. BEDELL, Mr. BONER of Tennessee, Mr. OWENS. Mr. DAUB. Mr. CONTE. Mr. RAHALL,. Mr. GRAY, Mr. VANDER JAGT. Mr. TRAKLER. and Mr. VENTO. H. Con. Res. iO7: Mr. KASICH. Mr. ALCOIN. Mr. CARPER. and Mr. SCHEUER. H. Con. Res. 118: Mr. FISH, Mr. LANTOS. Mr. KILDEE. Mr. SOLARZ Mr. Bmrr, Mr. BELWLL, Mr. RANG~L, Mr. DYMALLY. Mr.

110

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E-T Global Energy, LLC E-T Global Energy, LLC OE Docket No. EA-381 Order Authorizing Electricity Exports to Mexico Order No. EA-381 June 10, 2011 I. BACKGROUND E-T Global Energy, LLC Order No. EA-381 Exports of electricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department ofEnergy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require authorization under section 202(e) ofthe Federal Power Act (FPA) (16 U.S.C.824a(e)) 1 * On May 10,2011, DOE received an application from E-T Global Energy, LLC (E-T Global) for authority to transmit electric energy from the United States to Mexico for five years as a power marketer using existing international transmission facilities. E-

111

MTS Table Top Load frame  

NLE Websites -- All DOE Office Websites (Extended Search)

MTS Table Top Load frame MTS Table Top Load frame The Non-destructive Evaluation group operates an MTS Table Top Load frame for ultimate strength and life cycle testing of various ceramic, ceramic-matrix (FGI), carbon, carbon fiber, cermet (CMC) and metal alloy engineering samples. The load frame is a servo-hydraulic type designed to function in a closed loop configuration under computer control. The system can perform non-cyclic, tension, compression and flexure testing and cyclic fatigue tests. The system is comprised of two parts: * The Load Frame and * The Control System. Load Frame The Load Frame (figure 1) is a cross-head assembly which includes a single moving grip, a stationary grip and LVDT position sensor. It can generate up to 25 kN (5.5 kip) of force in the sample under test and can

112

Determining the Cost of Cycling and Varied Load Operations: Methodology  

Science Conference Proceedings (OSTI)

For many reasons—heightened wholesale electricity competition under deregulation, new market rules, growing capacity due to additions of new gas-fired capacity, environmental pressures on coal units—the power industry must operate power plants differently. In particular, many generating units that formerly ran around the clock must adjust operations to cycle or to follow load (demand). This report describes a new methodology for estimating the long-term wear and tear costs that inevitably acc...

2002-11-22T23:59:59.000Z

113

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CC-1-I Availability: This rate schedule shall be available to public bodies and cooperatives served through the facilities of Carolina Power & Light Company, Western Division (hereinafter called the Customers). Applicability: This rate schedule shall be applicable to electric capacity and energy available from the Dale Hollow, Center Hill, Wolf Creek, Cheatham, Old Hickory, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereinafter called collectively the "Cumberland Projects") and sold in wholesale quantities. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

114

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TexMex Energy, LLC TexMex Energy, LLC OE Docket No. EA-294-A Order Authorizing Electricity Exports to Mexico Order No. EA-294-A February 22, 2007 TexMex Energy, LLC Order No. EA-294-A I. BACKGROUND Exports of electricity from the United States to a foreign count~y are regulated by the Department of Energy (DOE) pursuant to sections 301(b) and 402(f) of the Department of Energy Organization Act (42 U.S.C. 7 15 1 (b), 71 72(f)) and require authorization under section 202(e) of the Federal Power Act (FPA) (16 U.S.C.824a(e)) . On August 25,2004, DOE issued Order No. EA-294 authorizing TexMex Energy LLC (TexMex) to transmit electric energy fiom the United States to Mexico as a power marketer. That authority expired on August 25, 2006. On September 8, 2006, TexMex applied to renew the electricity export authority

115

United States  

Gasoline and Diesel Fuel Update (EIA)

United States United States Coal ................................................ 4,367 4,077 4,747 4,181 4,473 4,125 4,983 4,330 4,414 4,003 4,796 4,178 4,344 4,479 4,348 Natural Gas .................................... 2,802 2,843 3,694 2,863 2,713 2,880 3,636 2,707 2,792 2,972 3,815 2,849 3,052 2,986 3,109 Petroleum (a) .................................. 74 73 81 67 73 70 75 66 75 70 76 66 74 71 71 Other Gases ................................... 32 33 36 32 32 34 37 33 33 35 39 34 33 34 35 Nuclear ........................................... 2,176 2,044 2,257 2,170 2,106 2,037 2,167 2,010 2,144 2,074 2,206 2,055 2,162 2,080 2,120 Renewable Energy Sources: Conventional Hydropower ........... 736 886 716 633 765 887 708 646 767 919 729 659 742 751 768 Wind ............................................ 491 520 353 449 477 521 379 475

116

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tenaslta Power Services Co. Tenaslta Power Services Co. OE Docket No. EA-243-A Order Authorizing Electricity Exports to Canada Order No. EA-243-A March 1,2007 Tenaska Power Services Co. Order No. EA-243-A I. BACKGROUND Exports of elcctricity from the United States to a foreign country are regulated by the Department of Energy (DOE) pursuant to sections 30 I(b) and 402(f) of the Departrncnt of' Energy Organizatio~l Act (42 U, S.C. 7 15 1 (b), 7 1 72Cf)) and rcquirc authorization under section 202(e) of the Federal Power Act (FPA) ( Z 6 U. s.c.824a(e)j1. On August 16,2001, DOE issued Order No. EA-243 authorizing Tenaska Power Scrvices Co. (Tenaska) to transmit electric cncrgy from the United States to Canada as a power marketer. That authority expired on August 16,2003. On August 14,2006, Teilaska applied to renew the electricity export authority

117

Unit Cost Natural Gas | OpenEI  

Open Energy Info (EERE)

2 2 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142281532 Varnish cache server Unit Cost Natural Gas Dataset Summary Description Provides annual energy usage for years 1989 through 2010 for UT at Austin; specifically, electricity usage (kWh), natural gas usage (Mcf), associated costs. Also provides water consumption for 2005 through 2010. Source University of Texas (UT) at Austin, Utilities & Energy Management Date Released Unknown Date Updated Unknown Keywords Electricity Consumption Natural Gas Texas Unit Cost Electricity Unit Cost Natural Gas University Water Data application/vnd.ms-excel icon Energy and Water Use Data for UT-Austin (xls, 32.8 KiB) Quality Metrics

118

Unit Cost Electricity | OpenEI  

Open Energy Info (EERE)

8 8 Varnish cache server Browse Upload data GDR 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142281518 Varnish cache server Unit Cost Electricity Dataset Summary Description Provides annual energy usage for years 1989 through 2010 for UT at Austin; specifically, electricity usage (kWh), natural gas usage (Mcf), associated costs. Also provides water consumption for 2005 through 2010. Source University of Texas (UT) at Austin, Utilities & Energy Management Date Released Unknown Date Updated Unknown Keywords Electricity Consumption Natural Gas Texas Unit Cost Electricity Unit Cost Natural Gas University Water Data application/vnd.ms-excel icon Energy and Water Use Data for UT-Austin (xls, 32.8 KiB) Quality Metrics

119

Load Management: Opportunity or Calamity?  

E-Print Network (OSTI)

After the change in the economics of generating electricity which took place in 1973, many utilities are examining options to hold down their costs. One fact which is clear is that the difference between peak and off peak generating costs is much larger now than prior to 1973. Utilities are examining two options which can be termed load management. One option is to control discretionary loads during peak periods. Cycling of residential water heaters or shutting off industrial electric furnaces during peak periods are both examples of load control which lower the costs borne by the utility. The other option is the use of seasonal surcharges or time-of-day rates to induce customers to alter their usage patterns. Both these load management options focus on reducing utility costs overall without regard to the cost to the consumers affected by the load management options. The issue, then, is whether industrial customers can find opportunities to lower their costs under load management.

Males, R.; Hassig, N.

1981-01-01T23:59:59.000Z

120

Dynamic load balancing of applications  

DOE Patents (OSTI)

An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated.

Wheat, Stephen R. (Albuquerque, NM)

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Dynamic load balancing of applications  

DOE Patents (OSTI)

An application-level method for dynamically maintaining global load balance on a parallel computer, particularly on massively parallel MIMD computers is disclosed. Global load balancing is achieved by overlapping neighborhoods of processors, where each neighborhood performs local load balancing. The method supports a large class of finite element and finite difference based applications and provides an automatic element management system to which applications are easily integrated. 13 figs.

Wheat, S.R.

1997-05-13T23:59:59.000Z

122

Alaska Village Electric Load Calculator  

DOE Green Energy (OSTI)

As part of designing a village electric power system, the present and future electric loads must be defined, including both seasonal and daily usage patterns. However, in many cases, detailed electric load information is not readily available. NREL developed the Alaska Village Electric Load Calculator to help estimate the electricity requirements in a village given basic information about the types of facilities located within the community. The purpose of this report is to explain how the load calculator was developed and to provide instructions on its use so that organizations can then use this model to calculate expected electrical energy usage.

Devine, M.; Baring-Gould, E. I.

2004-10-01T23:59:59.000Z

123

High-Power Rf Load  

DOE Patents (OSTI)

A compact high-power RF load comprises a series of very low Q resonators, or chokes [16], in a circular waveguide [10]. The sequence of chokes absorb the RF power gradually in a short distance while keeping the bandwidth relatively wide. A polarizer [12] at the input end of the load is provided to convert incoming TE.sub.10 mode signals to circularly polarized TE.sub.11 mode signals. Because the load operates in the circularly polarized mode, the energy is uniformly and efficiently absorbed and the load is more compact than a rectangular load. Using these techniques, a load having a bandwidth of 500 MHz can be produced with an average power dissipation level of 1.5 kW at X-band, and a peak power dissipation of 100 MW. The load can be made from common lossy materials, such as stainless steel, and is less than 15 cm in length. These techniques can also produce loads for use as an alternative to ordinary waveguide loads in small and medium RF accelerators, in radar systems, and in other microwave applications. The design is easily scalable to other RF frequencies and adaptable to the use of other lossy materials.

Tantawi, Sami G. (San Mateo, CA); Vlieks, Arnold E. (Livermore, CA)

1998-09-01T23:59:59.000Z

124

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTV-1-H Availability: This rate schedule shall be available to the Tennessee Valley Authority (hereinafter called TVA). Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and TVA. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating current at a frequency of approximately 60 hertz at the outgoing terminals of the Cumberland

125

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule CTVI-1-A Availability: This rate schedule shall be available to customers (hereinafter called the Customer) who are or were formerly in the Tennessee Valley Authority (hereinafter called TVA) service area. Applicability: This rate schedule shall be applicable to electric capacity and energy generated at the Dale Hollow, Center Hill, Wolf Creek, Old Hickory, Cheatham, Barkley, J. Percy Priest, and Cordell Hull Projects (all of such projects being hereafter called collectively the "Cumberland Projects") and the Laurel Project sold under agreement between the Department of Energy and the Customer. Character of Service: The electric capacity and energy supplied hereunder will be three-phase alternating

126

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bangor Hydro-Electric Company Bangor Hydro-Electric Company OE Docket No. PP-89-1 Amendment to Presidential Permit Order No. PP-89-1 December 30,2005 PRESIDENTIAL PERMIT AMENDMENT Bangor Hydro-Electric Company Order No. PP-89-1 I. BACKGROUND The Department of Energy (DOE) has responsibility for implementing Executive Order (E.O.) 10485, as amended by E.O. 12038, which requires the issuance of a Presidential permit by DOE before electric trans~nission facilities may be constructed, operated, maintained, or connected at the borders of the United States. DOE may issue such a permit if it determines that the permit is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. On December 16, 1988, Bangor Hydro-Electric Company (BHE) applied to DOE

127

UNITED STATES  

Office of Legacy Management (LM)

f).~<~~ \--\c :y-,ai F p"- KG f).~<~~ \--\c :y-,ai F p"- KG WASHINOTDN 28.0. C. ' -lr ' \ ' ' --- ".I ?--" ' z I. .~;-4.' J frr*o& 2 ii, - - -4 70-147 LRL:JCD JAN !! 8 1958 Oregon Metallurgical Corporation P. 0. Box 484 Albany, Oregon Attention: Mr. Stephen M. Shelton General Manager Gentlemen: Enclosed is Special Nuclear Material License No. SNM-144, as amended. Very 33uly yours, r:; I,;, ll)~gQ""d".- Lyall Johnson Chief, Licensing Branch Division of Licensing & Regulation Enclosure: SNM-144, as amended Distribution: bRO0 Attn: Dr. H.M.Roth DFMusser NMM MMMann INS JCRyan FIN (2) HSteele LRL SRGustavson LRL Document room Formal file Suppl. file Br & Div rf's ' .b liwwArry s/VW- ' q+ ' yj/ 2; 2-' , COP' 1 J JAM01958 -- UNITED STATES ATOMIC ENERGY COMMISSION

128

United States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Department of Energy Southeastern Power Administration Wholesale Power Rate Schedule JW-2-F Availability: This rate schedule shall be available to the Florida Power Corporation (or Progress Energy Florida, hereinafter called the Company). Applicability: This rate schedule shall be applicable to electric energy generated at the Jim Woodruff Project (hereinafter called the Project) and sold to the Company in wholesale quantities. Points of Delivery: Power sold to the Company by the Government will be delivered at the connection of the Company's transmission system with the Project bus. Character of Service: Electric power delivered to the Company will be three-phase alternating current at a nominal frequency of 60 cycles per second.

129

United Energy | Open Energy Information  

Open Energy Info (EERE)

United Energy United Energy Name United Energy Address 284, Old Deal Rd Place Eatontown, New Jersey Zip 07722 Sector Solar Product Energy Efficiency, Renewable Energy Year founded 2009 Number of employees 1-10 Phone number 201-697-8770 Website http://www.unitedenergypro.com Coordinates 40.2785975°, -74.0359722° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2785975,"lon":-74.0359722,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

130

LOAD FORECASTING Eugene A. Feinberg  

E-Print Network (OSTI)

's electricity price forecasting model, produces forecast of gas demand consistent with electric load. #12Gas demand Council's Market Price of Electricity Forecast Natural GasDemand Electric Load Aggregating Natural between the natural gas and electricity and new uses of natural gas emerge. T natural gas forecasts

Feinberg, Eugene A.

131

Static identification of delinquent loads  

E-Print Network (OSTI)

The effective use of processor caches is crucial to the performance of applications. It has been shown that cache misses are not evenly distributed throughout a program. In applications running on RISC-style processors, a small number of delinquent load instructions are responsible for most of the cache misses. Identification of delinquent loads is the key to the success of many cache optimization and prefetching techniques. In this paper, we propose a method for identifying delinquent loads that can be implemented at compile time. Our experiments over eighteen benchmarks from the SPEC suite shows that our proposed scheme is stable across benchmarks, inputs, and cache structures, identifying an average of 10 % of the total number of loads in the benchmarks we tested that account for over 90 % of all data cache misses. As far as we know, this is the first time a technique for static delinquent load identification with such a level of precision and coverage has been reported. While comparable techniques can also identify load instructions that cover 90 % of all data cache misses, they do so by selecting over 50 % of all load instructions in the code, resulting in a high number of false positives. If basic block profiling is used in conjunction with our heuristic, then our results show that it is possible to pin down just 1.3 % of the load instructions that account for 82 % of all data cache misses. 1.

Vlad-mihai Panait; Amit Sasturkar Ý

2004-01-01T23:59:59.000Z

132

Review of Residential Low-Load HVAC Systems  

SciTech Connect

In support of the U.S. Department of Energy’s (DOE’s) Building America Program, Pacific Northwest National Laboratory (PNNL) conducted an investigation to inventory commercially available HVAC technologies that are being installed in low-load homes. The first step in this investigation was to conduct a review of published literature to identify low-load HVAC technologies available in the United States and abroad, and document the findings of existing case studies that have evaluated the performance of the identified technologies. This report presents the findings of the literature review, identifies gaps in the literature or technical understanding that must be addressed before low-load HVAC technologies can be fully evaluated, and introduces PNNL’s planned research and analysis for this project to address identified gaps and potential future work on residential low-load HVAC systems.

Brown, Scott A.; Thornton, Brian; Widder, Sarah H.

2013-09-01T23:59:59.000Z

133

building load | OpenEI  

Open Energy Info (EERE)

load load Dataset Summary Description This dataset contains hourly load profile data for 16 commercial building types (based off the DOE commercial reference building models) and residential buildings (based off the Building America House Simulation Protocols). This dataset also includes the Residential Energy Consumption Survey (RECS) for statistical references of building types by location. Source Commercial and Residential Reference Building Models Date Released April 18th, 2013 (9 months ago) Date Updated July 02nd, 2013 (7 months ago) Keywords building building demand building load Commercial data demand Energy Consumption energy data hourly kWh load profiles Residential Data Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually

134

Wind load reduction for heliostats  

DOE Green Energy (OSTI)

This report presents the results of wind-tunnel tests supported through the Solar Energy Research Institute (SERI) by the Office of Solar Thermal Technology of the US Department of Energy as part of the SERI research effort on innovative concentrators. As gravity loads on drive mechanisms are reduced through stretched-membrane technology, the wind-load contribution of the required drive capacity increases in percentage. Reduction of wind loads can provide economy in support structure and heliostat drive. Wind-tunnel tests have been directed at finding methods to reduce wind loads on heliostats. The tests investigated primarily the mean forces, moments, and the possibility of measuring fluctuating forces in anticipation of reducing those forces. A significant increase in ability to predict heliostat wind loads and their reduction within a heliostat field was achieved.

Peterka, J.A.; Hosoya, N.; Bienkiewicz, B.; Cermak, J.E.

1986-05-01T23:59:59.000Z

135

Spinning Reserve from Responsive Load  

SciTech Connect

As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host a spinning reserve test. The Tennessee Valley Authority (TVA) supplied real-time metering and monitoring expertise to record total hotel load during both normal operations and testing. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. The load drop was very rapid, essentially as fast as the 2 second metering could detect.

Kueck, John D [ORNL; Kirby, Brendan J [ORNL; Laughner, T [Tennessee Valley Authority (TVA); Morris, K [Tennessee Valley Authority (TVA)

2009-01-01T23:59:59.000Z

136

High-power I-V curve tracer employing a capacitive load  

SciTech Connect

A portable, photovoltaic voltage versus current curve tracer is discussed. The curve tracer employs a capacitive load to provide automatic sweeping of the array voltage. The unit is capable of measuring arrays up to 10 kW, but is similar and lighter than a conventional 2.5-kW dissipative load.

Warner, T.H.; Cox, C.H. III

1981-01-01T23:59:59.000Z

137

Advanced nonintrusive load monitoring system  

E-Print Network (OSTI)

There is a need for flexible, inexpensive metering technologies that can be deployed in many different monitoring scenarios. Individual loads may be expected to compute information about their power consumption. Utility ...

Wichakool, Warit, 1977-

2011-01-01T23:59:59.000Z

138

OpenEI - building load  

Open Energy Info (EERE)

are given by a location defined by the Typical Meteorological Year (TMY) for which the weather data was collected. Commercial load data is sorted by the (TMY) site as a...

139

Permanent Load Shift Control Strategies  

NLE Websites -- All DOE Office Websites (Extended Search)

of Permanent Load Shifting for HVAC and other storage assets as it relates to summer on-peak demand, how it can be dynamically and autonomously controlled, and its relationship...

140

Building load control and optimization  

E-Print Network (OSTI)

Researchers and practitioners have proposed a variety of solutions to reduce electricity consumption and curtail peak demand. This research focuses on load control by improving the operations in existing building HVAC ...

Xing, Hai-Yun Helen, 1976-

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Compact monolithic capacitive discharge unit  

DOE Patents (OSTI)

A compact monolithic capacitive discharge unit (CDU) is disclosed in which a thyristor switch and a flyback charging circuit are both sandwiched about a ceramic energy storage capacitor. The result is a compact rugged assembly which provides a low-inductance current discharge path. The flyback charging circuit preferably includes a low-temperature co-fired ceramic transformer. The CDU can further include one or more ceramic substrates for enclosing the thyristor switch and for holding various passive components used in the flyback charging circuit. A load such as a detonator can also be attached directly to the CDU.

Roesler, Alexander W. (Tijeras, NM); Vernon, George E. (Rio Rancho, NM); Hoke, Darren A. (Albuquerque, NM); De Marquis, Virginia K. (Tijeras, NM); Harris, Steven M. (Albuquerque, NM)

2007-06-26T23:59:59.000Z

142

Load transfer coupling regression curve fitting for distribution load forecasting  

SciTech Connect

The planning of distribution facilities requires forecasts of future substation and feeder loads. Extrapolation based on a curve fit to past annual peak loads is currently the most popular manner of accomplishing this forecast. Curve fitting suffers badly from data shifts caused by switching as loads are routinely moved from one substation to another during the course of utility operations. This switching contaminates the data, reducing forecast accuracy. A new regression application reduces error due to these transfers by over an order of magnitude. A key to the usefulness of this method is that the amount of the transfer, and its direction (whether it was to or from a substation), is not a required input. The new technique, aspects of computer implementation of it, and a series of tests showing its advantage over normal multiple regression methods are given.

Willis, H.L.; Powell, R.W.

1984-05-01T23:59:59.000Z

143

Realizing load reduction functions by aperiodic switching of load groups  

SciTech Connect

This paper investigates the problem of scheduling ON/OFF switching of residential appliances under the control of a Load Management System (LMS). The scheduling process is intended to reduce the controlled appliances` power demand in accordance with a predefined load reduction profile. To solve this problem, a solution approach, based on the methodology of Pulse Width Modulation (PWM), is introduced. This approach provides a flexible mathematical basis for studying different aspects of the scheduling problem. The conventional practices in this area are shown to be special cases of the PWM technique. By applying the PWM-based technique to the scheduling problem, important classes of scheduling errors are identified and analytical expressions describing them are derived. These expressions are shown to provide sufficient information to compensate for the errors. Detailed simulations of load groups` response to switching actions are use to support conclusions of this study.

Navid-Azarbaijani, N. [McGill Univ., Montreal, Quebec (Canada). Dept. of Electrical Engineering; Banakar, M.H. [CAE Electronics Ltd., St. Laurent, Quebec (Canada)

1996-05-01T23:59:59.000Z

144

Microsoft Word - UPDATE 2 - Unit 1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 to: 2 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Unit 1 Emissions at Maximum and Minimum Loads ENSR Corporation December 20, 2005 Document Number 10350-002-410 (Update 2) December, 2005 1-1 1.0 INTRODUCTION This report describes AERMOD modeling results performed for Unit 1 at Mirant's Potomac River Generating Station. The purpose of these runs was to demonstrate that operation of Unit 1 for 24 hours a day at loads from 35 MW to 88 MW with the use of trona to reduce SO 2 emissions will not cause or contribute to modeled exceedances of the National Ambient Air Quality Standards (NAAQS). Mirant proposes to use trona on an as needed basis to limit SO 2 emissions to less than 0.89 lb/MMBtu

145

Microsoft Word - UPDATE 4 - Unit 4.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 to: 4 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Unit 4 Emissions at Maximum and Minimum Loads ENSR Corporation December 23, 2005 Document Number 10350-002-410 (Update 4) December, 2005 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for Unit 4 at Mirant's Potomac River Generating Station. The modeling was performed according to the Protocol approved by the Virginia Department of Environmental Quality. The purpose of the modeling was to demonstrate that Unit 4, operating alone under minimum and maximum loads will not cause or contribute to exceedances of the National Ambient Air Quality Standards (NAAQS). Section 2 of this report presents the stack and emission parameters included in the modeling. Section

146

United Illuminating | Open Energy Information  

Open Energy Info (EERE)

Illuminating Illuminating Jump to: navigation, search Logo: United Illuminating Name United Illuminating Address 157 Church St Place New Haven, Connecticut Zip 06510 Sector Services Product Green Power Marketer Website http://www.uinet.com/ Coordinates 41.3073289°, -72.9247896° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.3073289,"lon":-72.9247896,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

147

United Nations | Open Energy Information  

Open Energy Info (EERE)

Nations Nations Jump to: navigation, search Logo: United Nations Name United Nations Address UN Headquarters 1st Ave & 46th Street Place New York, NY Zip 10017 Region Northeast - NY NJ CT PA Area Year founded 1945 Website http://www.un.org/ Coordinates 40.7143528°, -74.0059731° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7143528,"lon":-74.0059731,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

148

Loads Providing Ancillary Services: Review of InternationalExperience-- Technical Appendix: Market Descriptions  

Science Conference Proceedings (OSTI)

In this study, we examine the arrangements for andexperiences of end-use loads providing ancillary services (AS) in fiveelectricity markets: Australia, the United Kingdom (UK), the Nordicmarket, and the ERCOT and PJM markets in the United States. Our objectivein undertaking this review of international experience was to identifyspecific approaches or market designs that have enabled customer loads toeffectively deliver various ancillary services (AS) products. We hopethat this report will contribute to the ongoing discussion in the U.S.and elsewhere regarding what institutional and technical developments areneeded to ensure that customer loads can meaningfully participate in allwholesale electricity markets.

Grayson Heffner, Charles Goldman, Kintner-Meyer, M; Kirby, Brendan

2007-05-01T23:59:59.000Z

149

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network (OSTI)

PSLF that incorporates motor  A?C, ZIP, and electronic load the fractions motors A?C, ZIP, and electronic loads.    Usethat incorporates motor  A?C, ZIP, and  electronic load 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

150

load profile | OpenEI Community  

Open Energy Info (EERE)

load profile Home Sfomail's picture Submitted by Sfomail(48) Member 17 May, 2013 - 13:03 Commercial and Residential Hourly Load Data Now Available on OpenEI building load building...

151

Monthly Crustal Loading Corrections for Satellite Altimetry  

Science Conference Proceedings (OSTI)

Satellite altimeter measurements of sea surface height include a small contribution from vertical motion of the seafloor caused by crustal loading. Loading by ocean tides is routinely allowed for in altimeter data processing. Here, loading by ...

R. D. Ray; S. B. Luthcke; T. van Dam

2013-05-01T23:59:59.000Z

152

Peak load management: Potential options  

SciTech Connect

This report reviews options that may be alternatives to transmission construction (ATT) applicable both generally and at specific locations in the service area of the Bonneville Power Administration (BPA). Some of these options have potential as specific alternatives to the Shelton-Fairmount 230-kV Reinforcement Project, which is the focus of this study. A listing of 31 peak load management (PLM) options is included. Estimated costs and normalized hourly load shapes, corresponding to the respective base load and controlled load cases, are considered for 15 of the above options. A summary page is presented for each of these options, grouped with respect to its applicability in the residential, commercial, industrial, and agricultural sectors. The report contains comments on PLM measures for which load shape management characteristics are not yet available. These comments address the potential relevance of the options and the possible difficulty that may be encountered in characterizing their value should be of interest in this investigation. The report also identifies options that could improve the efficiency of the three customer utility distribution systems supplied by the Shelton-Fairmount Reinforcement Project. Potential cogeneration options in the Olympic Peninsula are also discussed. These discussions focus on the options that appear to be most promising on the Olympic Peninsula. Finally, a short list of options is recommended for investigation in the next phase of this study. 9 refs., 24 tabs.

Englin, J.E.; De Steese, J.G.; Schultz, R.W.; Kellogg, M.A.

1989-10-01T23:59:59.000Z

153

Self-aligning biaxial load frame  

DOE Patents (OSTI)

An self-aligning biaxial loading apparatus for use in testing the strength of specimens while maintaining a constant specimen centroid during the loading operation. The self-aligning biaxial loading apparatus consists of a load frame and two load assemblies for imparting two independent perpendicular forces upon a test specimen. The constant test specimen centroid is maintained by providing elements for linear motion of the load frame relative to a fixed cross head, and by alignment and linear motion elements of one load assembly relative to the load frame. 3 figures.

Ward, M.B.; Epstein, J.S.; Lloyd, W.R.

1994-01-18T23:59:59.000Z

154

Decentralized customerlevel under frequency load shedding in...  

Open Energy Info (EERE)

enables the management of large groups of distributed loads under a single innovative control schemes to use the flexibility of electrical loads for power system purposes....

155

Building Energy Software Tools Directory: Load Express  

NLE Websites -- All DOE Office Websites (Extended Search)

graphical interface makes Load Express a powerful engineering tool with a very short learning curve. The "rookie" or experienced user can quickly and accurately perform load...

156

Energy Efficiency Indicators for High Electric-Load Buildings  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Efficiency Indicators for High Electric-Load Buildings Energy Efficiency Indicators for High Electric-Load Buildings Speaker(s): Bernard Aebischer Date: February 6, 2003 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Kristina LaCommare Energy per unit of floor area is not an adequate indictor for energy efficiency in high electric-load buildings. For two activities, restaurants and computer centres, alternative indicators for energy efficiency are discussed. Prerequisites in order to be able to use these indicators in energy efficiency programmes are discussed. The opportunity of an internationally coordinated research activity is also presented. Since 1999, Dr. Bernard Aebischer has served as a senior scientist at CEPE (Centre for Energy Policy and Economics) of the Swiss Federal Institutes of

157

Comparison of Wind Power and Load Forecasting Error Distributions: Preprint  

DOE Green Energy (OSTI)

The introduction of large amounts of variable and uncertain power sources, such as wind power, into the electricity grid presents a number of challenges for system operations. One issue involves the uncertainty associated with scheduling power that wind will supply in future timeframes. However, this is not an entirely new challenge; load is also variable and uncertain, and is strongly influenced by weather patterns. In this work we make a comparison between the day-ahead forecasting errors encountered in wind power forecasting and load forecasting. The study examines the distribution of errors from operational forecasting systems in two different Independent System Operator (ISO) regions for both wind power and load forecasts at the day-ahead timeframe. The day-ahead timescale is critical in power system operations because it serves the unit commitment function for slow-starting conventional generators.

Hodge, B. M.; Florita, A.; Orwig, K.; Lew, D.; Milligan, M.

2012-07-01T23:59:59.000Z

158

Method for loading resin beds  

DOE Patents (OSTI)

An improved method of preparing nuclear reactor fuel by carbonizing a uranium loaded cation exchange resin provided by contacting a H.sup.+ loaded resin with a uranyl nitrate solution deficient in nitrate, comprises providing the nitrate deficient solution by a method comprising the steps of reacting in a reaction zone maintained between about 145.degree.-200.degree. C, a first aqueous component comprising a uranyl nitrate solution having a boiling point of at least 145.degree. C with a second aqueous component to provide a gaseous phase containing HNO.sub.3 and a reaction product comprising an aqueous uranyl nitrate solution deficient in nitrate.

Notz, Karl J. (Oak Ridge, TN); Rainey, Robert H. (Knoxville, TN); Greene, Charles W. (Knoxville, TN); Shockley, William E. (Oak Ridge, TN)

1978-01-01T23:59:59.000Z

159

Impact of Minimum Load Operation on Steam Turbines  

Science Conference Proceedings (OSTI)

Some utilities, as part of a fleet management strategy, are keeping baseload-design plants that are not competitive for 24/7 dispatch at minimum loads to increase their ability to respond to changing demand. Units being operated this way face some associated risks and may see an additional drop in availability, further exacerbating supply management issues and increasing O&M costs. This report seeks to capture ...

2013-11-05T23:59:59.000Z

160

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2011 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: FRIDAY MARCH 4, 2011 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Unit Outline Training Guide  

E-Print Network (OSTI)

Unit Outline Builder Training Guide Document Status: Final Revision Number: 6.0 Revision Date: 14 Approved #12;Online Unit Outline Builder Training Guide Curtin University of Technology Page 2 TABLE................................................................................................................. 4 4. Log in and Select a Unit Outline

162

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2013 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: MARCH 5, 2013 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

163

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2012 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: FRIDAY MARCH 2, 2012 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

164

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: CLASSIFICATION / TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2014 FRANKLIN STAFF SERVICE AWARDS START DATE IN DEPARTMENT / UNIT: ACTUAL NUMBER MEMBER DEADLINE: MARCH 7, 2014 ADDITIONAL COMMENTS: Signature of Head / Director of Nominee's Unit

Arnold, Jonathan

165

54.5 MPG and Beyond: Materials Lighten the Load for Fuel Economy |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

54.5 MPG and Beyond: Materials Lighten the Load for Fuel Economy 54.5 MPG and Beyond: Materials Lighten the Load for Fuel Economy 54.5 MPG and Beyond: Materials Lighten the Load for Fuel Economy December 4, 2012 - 12:06pm Addthis Lightweight materials, such as high-strength steel, aluminum, magnesium and carbon fiber can help improve fuel economy in future vehicles. This is a carbon fiber from microwave-assisted plasma unit -- a unit that is part of the process to transform precursor fibers into carbon fibers that can be used in vehicles. | Photo courtesy of Oak Ridge National Laboratory. Lightweight materials, such as high-strength steel, aluminum, magnesium and carbon fiber can help improve fuel economy in future vehicles. This is a carbon fiber from microwave-assisted plasma unit -- a unit that is part of the process to transform precursor fibers into carbon fibers that can be

166

PRB rail loadings shatter record  

Science Conference Proceedings (OSTI)

Rail transport of coal in the Powder River Basin has expanded, with a record 2,197 trains loaded in a month. Arch Coal's Thunder basin mining complex has expanded by literally bridging the joint line railway. The dry fork mine has also celebrated its safety achievements. 4 photos.

Buchsbaum, L.

2008-09-15T23:59:59.000Z

167

Automatic Electric Load Identification in  

E-Print Network (OSTI)

Abstract — A microgrid is the power system of choice for the electrification of rural areas in developing countries. It should be able to adapt to changing load situations without the need for specialists to change the configuration of the microgrid controller. This paper proposes a self-configuring microgrid management system that is able to adjust both generation and demand of the system, so that also in case of growing electricity demand the grid can still be operable by disconnecting unessential loads. A crucial task for the microgrid controller is to automatically identify the connected loads on the basis of their consumption behaviors. For this, a template-matching algorithm is proposed that is based on Dynamic Time Warping, which is primarily used in speech recognition. It has been found that for load profile analysis, simple signal features such as the number of rising edges or the aggregated energy consumption in a given time window is sufficient to describe the signal. In contrast to speech recognition, frequency domain analysis is not necessary.

Self-configuring Microgrids; Friederich Kupzog; Tehseen Zia; Adeel Abbas Zaidi

2009-01-01T23:59:59.000Z

168

On-line load relief control  

SciTech Connect

This paper describes the results of an investigation concerning the on-line prediction and enhancement of load relief. The effects of voltage fluctuation, system voltage profile control and generator voltage adjustment on load relief and load shedding operations during under-frequency transients are studied. The technique promoted in the paper may be used to reduce system spinning reserve or prospective load shedding.

Jovanovic, S.; Fox, B.; Thompson, J.G. (Queen' s Univ. of Belfast (United Kingdom))

1994-11-01T23:59:59.000Z

169

Evolving non-intrusive load monitoring  

Science Conference Proceedings (OSTI)

Non-intrusive load monitoring (NILM) identifies used appliances in a total power load according to their individual load characteristics. In this paper we propose an evolutionary optimization algorithm to identify appliances, which are modeled as on/off ... Keywords: NILM, evolution, evolutionary algorithm, knapsack problem, non-intrusive load monitoring

Dominik Egarter; Anita Sobe; Wilfried Elmenreich

2013-04-01T23:59:59.000Z

170

Load Forecasting for Modern Distribution Systems  

Science Conference Proceedings (OSTI)

Load forecasting is a fundamental activity for numerous organizations and activities within a utility, including planning, operations, and control. Transmission and Distribution (T&D) planning and design engineers use the load forecast to determine whether any changes and additions are needed to the electric system to satisfy the anticipated load. Other load forecast users include system operations, financial ...

2013-03-08T23:59:59.000Z

171

Load Forecast For use in Resource Adequacy  

E-Print Network (OSTI)

Load Forecast 2019 For use in Resource Adequacy Massoud Jourabchi #12;In today's presentation d l­ Load forecast methodology ­ Drivers of the forecast f i­ Treatment of conservation ­ Incorporating impact of weather ­ Forecast for 2019 #12;Regional Loads (MWA and MW)Regional Loads (MWA and MW

172

Behavior of Capstone and Honeywell microturbine generators during load changes  

SciTech Connect

This report describes test measurements of the behavior of two microturbine generators (MTGs) under transient conditions. The tests were conducted under three different operating conditions: grid-connect; stand-alone single MTG with load banks; and two MTGs running in parallel with load banks. Tests were conducted with both the Capstone 30-kW and Honeywell Parallon 75-kW MTGs. All tests were conducted at the Southern California Edison /University of California, Irvine (UCI) test facility. In the grid-connected mode, several test runs were conducted with different set-point changes both up and down and a start up and shutdown were recorded for each MTG. For the stand-alone mode, load changes were initiated by changing load-bank values (both watts and VARs). For the parallel mode, tests involved changes in the load-bank settings as well as changes in the power set point of the MTG running in grid-connect mode. Detailed graphs of the test results are presented. It should be noted that these tests were done using a specific hardware and software configuration. Use of different software and hardware could result in different performance characteristics for the same units.

Yinger, Robert J.

2001-07-01T23:59:59.000Z

173

Load-shape development aids planning  

SciTech Connect

The concept that provides capable, load-shape development, is being adopted by several utilities and power pools. Public Service Electric and Gas Company has developed a computer simulation model that can predict a utility's load shape for up to a 30-year period. The objective of the PSE and G model, known as EICS (Electric Load-Curve Synthesis) is to provide a demand profile, to examine the impact of load mangement and other activities upon a system's load shape, and to apply appropriate forecast non-load-management and load-management impacts before finally examining the resulting revised load-shape. Other models dealing with load-shape are discussed. Specifically, the Systems Control Inc. model for EPRI (SCI/EPRI), useful in performing accurate simulations of various load-control strategies involving customer appliance control is mentioned.

Gellings, C.W.

1979-12-15T23:59:59.000Z

174

Short-Term Load Forecasting Error Distributions and Implications for Renewable Integration Studies: Preprint  

DOE Green Energy (OSTI)

Load forecasting in the day-ahead timescale is a critical aspect of power system operations that is used in the unit commitment process. It is also an important factor in renewable energy integration studies, where the combination of load and wind or solar forecasting techniques create the net load uncertainty that must be managed by the economic dispatch process or with suitable reserves. An understanding of that load forecasting errors that may be expected in this process can lead to better decisions about the amount of reserves necessary to compensate errors. In this work, we performed a statistical analysis of the day-ahead (and two-day-ahead) load forecasting errors observed in two independent system operators for a one-year period. Comparisons were made with the normal distribution commonly assumed in power system operation simulations used for renewable power integration studies. Further analysis identified time periods when the load is more likely to be under- or overforecast.

Hodge, B. M.; Lew, D.; Milligan, M.

2013-01-01T23:59:59.000Z

175

United Nations Foundation (UNF) | Open Energy Information  

Open Energy Info (EERE)

United Nations Foundation (UNF) United Nations Foundation (UNF) Jump to: navigation, search Logo: United Nations Foundation Name United Nations Foundation Address 1800 Massachusetts Avenue NW, Suite 400 Place Washington, DC Zip 20036 Region Northeast - NY NJ CT PA Area Coordinates 38.90879°, -77.042271° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.90879,"lon":-77.042271,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

176

Good Energies (United Kingdom) | Open Energy Information  

Open Energy Info (EERE)

United Kingdom) United Kingdom) Name Good Energies (United Kingdom) Address 2-5 Old Bond Street Place London, United Kingdom Zip W1S 4PD Product Global investor in renewable energy and energy efficiency industries Year founded 2001 Phone number +44 20 7659 3300 Website http://www.goodenergies.com/ Coordinates 51.5083291°, -0.1403335° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.5083291,"lon":-0.1403335,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

177

The development of an approximate dynamic analysis of insulating glass units  

E-Print Network (OSTI)

The goal of this thesis is to develop an approximate dynamic analysis of sealed insulating glass (IG) units subject to uniform blast loads, the formulation of which will be incorporated into a computer program that will be used as a tool to estimate their dynamic response. The formulation of this approximate dynamic analysis of IG units is achieved by modeling the unit with two equivalent single degree of freedom systems consisting of equivalent masses, equivalent structural stiffnesses, equivalent forces, and by incorporating air space compatibility relationships into this model. The equations of motion which define the behavior of this dynamic model are incorporated into a computer program that computes the dynamic response of an IG unit subjected to a prescribed blast loading. This response includes the displacements, velocities, and accelerations of the glass plates of the IG unit. The blast loading will be idealized in order to simplify the analysis. The program will approximate the positive pressure phase of a blast load with an equivalent triangular loading. IG units designed by existing methods will be analyzed using the program, and their performance evaluated. This analysis will not only provide valuable data on the behavior of the IG units to blast loadings, but will lend insight into the acceptability of the existing design approach. The results will also indicate the acceptability of the technique developed in this thesis as a tool in the design and analysis of IG units subject to blast loads.

Sequeira, Miguel Angel

1995-01-01T23:59:59.000Z

178

Load Scheduling with Profile Information  

E-Print Network (OSTI)

. Within the past five years, many manufactures have added hardware performance counters to their microprocessors to generate profile data cheaply. We show how to use Compaq's DCPI tool to determine load latencies which are at a fine, instruction granularity and use them as fodder for improving instruction scheduling. We validate our heuristic for using DCPI latency data to classify loads as hits and misses against simulation numbers. We map our classification into the Multiflow compiler's intermediate representation, and use a locality sensitive Balanced scheduling algorithm. Our experiments illustrate that our algorithm improves run times by 1% on average, but up to 10% on a Compaq Alpha. 1 Introduction This paper explores how to use hardware performance counters to produce fine grain latency information to improve compiler scheduling. We use this information to hide latencies with any available instruction level parallelism (ILP). (ILP for an instruction is the number of o...

Götz Lindenmaier; Kathryn S. McKinley; Olivier Temam

2000-01-01T23:59:59.000Z

179

PASSIVE DETECTION OF VEHICLE LOADING  

SciTech Connect

The Digital Imaging and Remote Sensing Laboratory (DIRS) at the Rochester Institute of Technology, along with the Savannah River National Laboratory is investigating passive methods to quantify vehicle loading. The research described in this paper investigates multiple vehicle indicators including brake temperature, tire temperature, engine temperature, acceleration and deceleration rates, engine acoustics, suspension response, tire deformation and vibrational response. Our investigation into these variables includes building and implementing a sensing system for data collection as well as multiple full-scale vehicle tests. The sensing system includes; infrared video cameras, triaxial accelerometers, microphones, video cameras and thermocouples. The full scale testing includes both a medium size dump truck and a tractor-trailer truck on closed courses with loads spanning the full range of the vehicle's capacity. Statistical analysis of the collected data is used to determine the effectiveness of each of the indicators for characterizing the weight of a vehicle. The final sensing system will monitor multiple load indicators and combine the results to achieve a more accurate measurement than any of the indicators could provide alone.

Garrett, A.

2012-01-03T23:59:59.000Z

180

System for loading executable code into volatile memory in a downhole tool  

DOE Patents (OSTI)

A system for loading an executable code into volatile memory in a downhole tool string component comprises a surface control unit comprising executable code. An integrated downhole network comprises data transmission elements in communication with the surface control unit and the volatile memory. The executable code, stored in the surface control unit, is not permanently stored in the downhole tool string component. In a preferred embodiment of the present invention, the downhole tool string component comprises boot memory. In another embodiment, the executable code is an operating system executable code. Preferably, the volatile memory comprises random access memory (RAM). A method for loading executable code to volatile memory in a downhole tool string component comprises sending the code from the surface control unit to a processor in the downhole tool string component over the network. A central processing unit writes the executable code in the volatile memory.

Hall, David R. (Provo, UT); Bartholomew, David B. (Springville, UT); Johnson, Monte L. (Orem, UT)

2007-09-25T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Electrical and Production Load Factors  

E-Print Network (OSTI)

Load factors are an important simplification of electrical energy use data and depend on the ratio of average demand to peak demand. Based on operating hours of a facility they serve as an important benchmarking tool for the industrial sector. The operating hours of small and medium sized manufacturing facilities are analyzed to identify the most common operating hour or shift work patterns. About 75% of manufacturing facilities fall into expected operating hour patterns with operating hours near 40, 80, 120 and 168 hours/week. Two types of load factors, electrical and production are computed for each shift classification within major industry categories in the U.S. The load factor based on monthly billing hours (ELF) increases with operating hours from about 0.4 for a nominal one shift operation, to about 0.7 for around-the-clock operation. On the other hand, the load factor based on production hours (PLF) shows an inverse trend, varying from about 1.4 for one shift operation to 0.7 for around-the-clock operation. When used as a diagnostic tool, if the PLF exceeds unity, then unnecessary energy consumption may be taking place. For plants operating at 40 hours per week, the ELF value was found to greater than the theoretical maximum, while the PLF value was greater than one, suggesting that these facilities may have significant energy usage outside production hours. The data for the PLF however, is more scattered for plants operating less than 80 hours per week, indicating that grouping PLF data based on operating hours may not be a reasonable approach to benchmarking energy use in industries. This analysis uses annual electricity consumption and demand along with operating hour data of manufacturing plants available in the U.S. Department of Energy’s Industrial Assessment Center (IAC) database. The annual values are used because more desirable monthly data are not available. Monthly data are preferred as they capture the load profile of the facility more accurately. The data there come from Industrial Assessment Centers which employ university engineering students, faculty and staff to perform energy assessments for small to medium-sized manufacturing plants. The nation-wide IAC program is sponsored by the U.S. Department of Energy.

Sen, Tapajyoti

2009-12-01T23:59:59.000Z

182

Method of and apparatus for controlling loads on an electrical power supply  

SciTech Connect

To enable a consumer of electrical energy to effect control of total energy consumption by various individual appliances and loads, each individual load has a control unit, conveniently in a plug top, which responds to pulses broadcast on the power supply wiring in the form of short duration interruptions of the waveform. At each appliance a microprocessor unit counts the number of successive pulses in a predetermined time interval and operates an electronic switch if the received count reaches a predetermined number, which may be different for different loads thereby enabling selective control of the loads. Provision is made for automatic restoration of supply if the overall energy consumption falls. Provision can also be made for automatic resumption of supp

Peddie, R.A.; Fielden, J.S.

1984-09-11T23:59:59.000Z

183

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network (OSTI)

of Estimated Load Reductions for PJM’s Small Customer Loadof Estimated Load Reductions for PJM’s Small Customer LoadResponse Pilot Project Prepared for PJM Interconnection, LLC

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

184

Economic impact evaluation of short-term load forecast errors using a mutative scale chaos optimization algorithm  

Science Conference Proceedings (OSTI)

Under the circumstances of Power Market, load forecast errors directly lead to the increase of costs of dispatch and maintenance. With a mutative scale chaos optimization algorithm (MSCOA), and the next-day units bidding model as the valuation model ... Keywords: MSCOA, load forecast error, power market

Jiang Chuanwen; Li Shuai; Wang Chengmin

2005-09-01T23:59:59.000Z

185

Automated fuel pin loading system  

DOE Patents (OSTI)

An automated loading system for nuclear reactor fuel elements utilizes a gravity feed conveyor which permits individual fuel pins to roll along a constrained path perpendicular to their respective lengths. The individual lengths of fuel cladding are directed onto movable transports, where they are aligned coaxially with the axes of associated handling equipment at appropriate production stations. Each fuel pin can be reciprocated axially and/or rotated about its axis as required during handling steps. The fuel pins are inserted as a batch prior to welding of end caps by one of two disclosed welding systems.

Christiansen, David W. (Kennewick, WA); Brown, William F. (West Richland, WA); Steffen, Jim M. (Richland, WA)

1985-01-01T23:59:59.000Z

186

High loading uranium fuel plate  

DOE Patents (OSTI)

Two embodiments of a high uranium fuel plate are disclosed which contain a meat comprising structured uranium compound confined between a pair of diffusion bonded ductile metal cladding plates uniformly covering the meat, the meat having a uniform high fuel loading comprising a content of uranium compound greater than about 45 Vol. % at a porosity not greater than about 10 Vol. %. In a first embodiment, the meat is a plurality of parallel wires of uranium compound. In a second embodiment, the meat is a dispersion compact containing uranium compound. The fuel plates are fabricated by a hot isostatic pressing process.

Wiencek, Thomas C. (Bolingbrook, IL); Domagala, Robert F. (Indian Head Park, IL); Thresh, Henry R. (Palos Heights, IL)

1990-01-01T23:59:59.000Z

187

Preconditioning Outside Air: Cooling Loads from Building Ventilation  

E-Print Network (OSTI)

HVAC equipment manufacturers, specifiers and end users interacting in the marketplace today are only beginning to address the series of issues promulgated by the increased outside air requirements in ASHRAE Standard 62- 1989, "Ventilation for Acceptable Indoor Air Quality", that has cascaded into building codes over the early to mid 1990's. There has been a twofold to fourfold increase in outside air requirements for many commercial building applications, compared to the 1981 version of the standard. To mitigate or nullify these additional weather loads, outdoor air preconditioning technologies are being promoted in combination with conventional HVAC operations downstream as a means to deliver the required fresh air and control humidity indoors. Preconditioning is the term applied for taking outside air to the indoor air setpoint (dry bulb temperature and relative humidity). The large humidity loads from outside air can now be readily recognized and quantified at cooling design point conditions using the extreme humidity ratios/dew points presented in the ASHRAE Handbook of Fundamentals Chapter 26 "Climatic Design Information". This paper presents an annual index called the Ventilation Load Index (VLI), recently developed by the Gas Research Institute (GRI) that measures the magnitude of latent (and sensible) loads for preconditioning outside air to indoor space conditions over the come of an entire year. The VLI has units of ton-hrs/scfm of outside air. The loads are generated using new weather data binning software called ~BinMaker, also from GRI, that organizes the 239 city, 8760 hour by hour, TMY2 weather data into user selected bidtables. The VLI provides a simple methodology for accessing the cooling load impact of increased ventilation air volumes and a potential basis for defining a "humid" climate location.

Kosar, D.

1998-01-01T23:59:59.000Z

188

Modeling and optimization of an adaptive dynamic load shedding using the ANFIS-PSO algorithm  

Science Conference Proceedings (OSTI)

This paper presents a new optimal adaptive dynamic load-shedding scheme for a large steelmaking industry with cogeneration units. The proposed method is based on the initial rate of a frequency change (df0/dt) and is coordinated with tie-lines frequency ... Keywords: adaptive network-based fuzzy inference system, artificial neural network, frequency stability, optimal load shedding, particle swarm optimization, under-frequency relays

Ghader Isazadeh; Rahmat-Allah Hooshmand; Amin Khodabakhshian

2012-02-01T23:59:59.000Z

189

Interruptible load control for Taiwan Power Company  

SciTech Connect

Load management is the planning and implementation of those utility activities designed to influence customer use of electricity in ways that will produce desired changes in the utility's load shape. Interruptible load program is an option of load management which provides incentive rate to customers to interrupt or reduce the power demand during the system peak period or emergency condition. Therefore, how to design a proper incentive rate is the most important issue in implementing this program. This paper describes three alternatives designed for the interruptible load program, one of which was activated by Taiwan Power Company (Taipower) and some preliminary results were obtained. The effect of the interruptible load to the system peak demand reduction and the change of daily load curve for large industrial customers were analyzed. This paper estimates the avoided cost and design more appropriate incentive rate structure for interruptible load program.

Chen, C.S.; Leu, J.T. (Dept. of Electrical Engineering, National Sun Yat-Sen Univ., Kaohsiung (TW))

1990-05-01T23:59:59.000Z

190

1994 Pacific Northwest Loads and Resources Study.  

Science Conference Proceedings (OSTI)

The 1994 Pacific Northwest Loads and Resources Study presented herein establishes a picture of how the agency is positioned today in its loads and resources balance. It is a snapshot of expected resource operation, contractual obligations, and rights. This study does not attempt to present or analyze future conservation or generation resource scenarios. What it does provide are base case assumptions from which scenarios encompassing a wide range of uncertainties about BPA`s future may be evaluated. The Loads and Resources Study is presented in two documents: (1) this summary of Federal system and Pacific Northwest region loads and resources and (2) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates the 1993 Pacific Northwest Loads and Resources Study, published in December 1993. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The Federal system and regional analyses for medium load forecast are presented.

United States. Bonneville Power Administration.

1994-12-01T23:59:59.000Z

191

Loads on drillpipe during jarring operations  

Science Conference Proceedings (OSTI)

Jarring implies heavy loads on the drillstring. The highest load on the drillpipe before jarring is at the rig floor. This paper discusses loads on drillpipe before, under, and after jarring. The authors show that for most situations, the shock wave from the jar impact does not imply additional load on the drillpipe compared with static load. The theoretical results are confirmed by measurements of a jarring operation with stuck point at [approx] 1,200 m measured depth. Loads on the drillpipe can be a limited factor in jarring operations because fear of possible additional loads from jarring dynamics may restrict the trip force (overpull) on the jar. The main conclusion is that dynamic jar forces do not give additional loads on drillpipe. This information can be used to set an optimal trip force on the jar.

Aarrestad, T.V.; Kyllingstad, A.

1994-12-01T23:59:59.000Z

192

Load Scheduling with Profile Information  

E-Print Network (OSTI)

Abstract Within the past five years, many manufactureshave added hardware performance counters to their microprocessors to generate profile data cheaply.Translating aggregate data such as basic block execution frequencies from the executable to the com-piler intermediate representation is fairly straightforward. In this paper, we show how to use Com-paq's DCPI tool to determine load latencies which are at a fine, instruction granularity and then usethem to provide fodder for improving instruction scheduling. We validate our heuristic for usingDCPI latency data to classify loads as hits and misses against simulation numbers, demonstratingthat we can gather correct latencies cheaply at runtime. We map our classification into the Multiflowcompiler's intermediate representation, and use a locality sensitive Balanced scheduling algorithm. Ourexperiments illustrate that our algorithm has the potential to improve run times by up to 10 % on a Com-paq Alpha when compared to Balanced scheduling, but that a variety of pitfalls make consistent im-provements difficult to attain. 1 Introduction In this paper, we explore how to use hardware per-formance counters to produce fine grain latency information to improve compiler scheduling. We usethis information to hide latencies with any avail\\Lambda The authors

unknown authors

1999-01-01T23:59:59.000Z

193

Load Management - A Better Way  

E-Print Network (OSTI)

Ohio Edison Company serves about 800,000 customers in Ohio and Pennsylvania, making it one of the 20 largest electric utilities in the nation. The 'cost of service' concept has been basic to rate design throughout the history of the company, and is evident today as the demand related charges have escalated in recent rate cases reflecting the higher costs of installing new generating facilities at today's high construction and financing costs. This paper will describe one of the many applications of load management techniques which has enabled the company to shift well over 100,000 kilowatts of customer load from the on-peak period to the off-peak period in the last four to five years. This is helping delay the need for new plants and allows existing plants to be more fully utilized, resulting in lower costs to customers who use their electric service wisely and possibly lower rate increases in the future than would have been required otherwise.

Easley, J. F.

1982-01-01T23:59:59.000Z

194

Plug Load Behavioral Change Demonstration Project  

SciTech Connect

This report documents the methods and results of a plug load study of the Environmental Protection Agency's Region 8 Headquarters in Denver, Colorado, conducted by the National Renewable Energy Laboratory. The study quantified the effect of mechanical and behavioral change approaches on plug load energy reduction and identified effective ways to reduce plug load energy. Load reduction approaches included automated energy management systems and behavioral change strategies.

Metzger, I.; Kandt, A.; VanGeet, O.

2011-08-01T23:59:59.000Z

195

Spinning reserve from hotel load response  

SciTech Connect

Even though preliminary tests were not conducted during times of highest system or hotel loading during the summer, they showed that hotel load can be curtailed by 22 to 37 percent depending on the outdoor temperature and time of day. Full response occurred in 12 to 60 seconds from when the system operator's command to shed load was issued and the load drop was very rapid. (author)

Kirby, Brendan; Kueck, John; Laughner, Theo; Morris, Keith

2008-12-15T23:59:59.000Z

196

Load Shape Library Version 1.0  

Science Conference Proceedings (OSTI)

The downloadable report details EPRI's efforts to develop a framework of a load database and web-accessible repository of end-use and whole-premise data for application to energy efficiency assessments. The tool provides access to the best available end-use load data and whole-premise data by sector, region and building type. Improved end-use load research data will benefit load forecasters, system planners, energy efficiency program managers and rate design analysts by facilitating integration ...

2013-02-12T23:59:59.000Z

197

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: JOB TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2014 FRANKLIN STAFF EXCELLENCE AWARDS START DATE IN DEPARTMENT / UNIT: Nominee Information NAME / RESEARCHPROFESSIONAL Signature of Head / Director of Nominee's Unit: NOMINATION PACKET DEADLINE: MARCH 7, 2014 PLEASE

Arnold, Jonathan

198

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: JOB TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2012 FRANKLIN STAFF EXCELLENCE AWARDS START DATE IN DEPARTMENT / UNIT: Nominee Information NAME / RESEARCHPROFESSIONAL Signature of Head / Director of Nominee's Unit: NOMINATION PACKET DEADLINE: FRIDAY MARCH 2, 2012

Arnold, Jonathan

199

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: JOB TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2011 FRANKLIN STAFF EXCELLENCE AWARDS START DATE IN DEPARTMENT / UNIT: Nominee Information NAME / RESEARCHPROFESSIONAL Signature of Head / Director of Nominee's Unit: NOMINATION PACKET DEADLINE: FRIDAY MARCH 4, 2011

Arnold, Jonathan

200

Nomination Form DEPARTMENT / UNIT  

E-Print Network (OSTI)

Nomination Form DEPARTMENT / UNIT: CAMPUS ADDRESS: JOB TITLE: DEPARTMENT EMAIL ADDRESS: DEPARTMENT TELEPHONE: 2013 FRANKLIN STAFF EXCELLENCE AWARDS START DATE IN DEPARTMENT / UNIT: Nominee Information NAME / RESEARCHPROFESSIONAL Signature of Head / Director of Nominee's Unit: NOMINATION PACKET DEADLINE: MARCH 5, 2013 PLEASE

Arnold, Jonathan

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Efficient real-time divisible load scheduling  

Science Conference Proceedings (OSTI)

Providing QoS and performance guarantees to arbitrarily divisible loads has become a significant problem for many cluster-based research computing facilities. While progress is being made in scheduling arbitrarily divisible loads, current approaches ... Keywords: Arbitrarily divisible loads, Cluster computing, Real-time computing, Scheduling efficiency

Anwar Mamat; Ying Lu; Jitender Deogun; Steve Goddard

2012-12-01T23:59:59.000Z

202

Properly Evaluating load-following products  

SciTech Connect

The authors briefly survey the jurisdictions where load-following products have been successfully used, examine the characteristics of the load-following products, and explain the shortcomings and inaccurate conclusions of previous analyses. A more thorough analysis reveals that the load-following products fulfill the public policy objectives for which they have been designed and do not adversely impact wholesale electricity markets.

Cavicchi, Joseph; Lemon, Andrew

2009-01-15T23:59:59.000Z

203

Glossary of terms related to load management  

Science Conference Proceedings (OSTI)

Part I of the Glossary of Terms related to Load Management has been prepared by the Terminology Task Force of the Load Management Subcommittee. The glossary contains many definitions of terms used by the electric utility industry concerning the subject of Load Management. The terms are listed in alphabetical order and cross-referenced where necessary.

Gellings, C.W.

1985-09-01T23:59:59.000Z

204

Domestic load scheduling using genetic algorithms  

Science Conference Proceedings (OSTI)

An approach using a genetic algorithm to optimize the scheduling of domestic electric loads, according to technical and user-defined constraints and input signals, is presented and illustrative results are shown. The aim is minimizing the end-user's ... Keywords: automated energy management, domestic load scheduling, electric loads, genetic algorithms

Ana Soares; Állvaro Gomes; Carlos Henggeler Antunes; Hugo Cardoso

2013-04-01T23:59:59.000Z

205

Neural-wavelet Methodology for Load Forecasting  

Science Conference Proceedings (OSTI)

Intelligent demand-side management represents a future trend of power system regulation. A key issue in intelligent demand-side management is accurate prediction of load within a local area grid (LAG), which is defined as a set of customers with an appropriate ... Keywords: load forecasting, load identification, neural-wavelet

Rong Gao; Lefteri H. Tsoukalas

2001-05-01T23:59:59.000Z

206

Adaptive load sharing for network processors  

Science Conference Proceedings (OSTI)

A novel scheme for processing packets in a router is presented that provides load sharing among multiple network processors distributed within the router. It is complemented by a feedback control mechanism designed to prevent processor overload. Incoming ... Keywords: computer networks, feedback control, load balancing, load sharing, packet processing, router architecture

Lukas Kencl; Jean-Yves Le Boudec

2008-04-01T23:59:59.000Z

207

Spinning Reserve From Hotel Load Response: Initial Progress  

SciTech Connect

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

Kueck, John D [ORNL; Kirby, Brendan J [ORNL

2008-11-01T23:59:59.000Z

208

NREL: Vehicles and Fuels Research - Vehicle Ancillary Loads Reduction  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Research Search More Search Options Site Map Photo of Advanced Automotive Manikin Reducing fuel consumption by air conditioning systems is the focus of Vehicle Ancillary Loads Reduction (VALR) activities at NREL. About 7 billion gallons of fuel-about 5.5% of total national light-duty vehicle fuel use-are used annually just to cool light-duty vehicles in the United States. That's why our VALR team works with industry to help increase fuel economy and reduce tailpipe emissions by reducing the ancillary loads requirements in vehicles while maintaining the thermal comfort of the passengers. Approaches include improved cabin insulation, advanced window systems, advanced cooling and venting systems, and heat generated cooling. Another focus of the VALR project is ADAM, the ADvanced Automotive Manikin

209

LITERATURE REVIEW ON MAXIMUM LOADING OF RADIONUCLIDES ON CRYSTALLINE SILICOTITANATE  

SciTech Connect

Plans are underway to use small column ion exchange (SCIX) units installed in high-level waste tanks to remove Cs-137 from highly alkaline salt solutions at Savannah River Site. The ion exchange material slated for the SCIX project is engineered or granular crystalline silicotitanate (CST). Information on the maximum loading of radionuclides on CST is needed by Savannah River Remediation for safety evaluations. A literature review has been conducted that culminated in the estimation of the maximum loading of all but one of the radionuclides of interest (Cs-137, Sr-90, Ba-137m, Pu-238, Pu-239, Pu-240, Pu-241, Am-241, and Cm-244). No data was found for Cm-244.

Adu-Wusu, K.; Pennebaker, F.

2010-10-13T23:59:59.000Z

210

Climate Change Impacts on Residential and Commercial Loads in the Western U.S. Grid  

SciTech Connect

This report presents a multi-disciplinary modeling approach to quickly quantify climate change impacts on energy consumption, peak load, and load composition of residential and commercial buildings. This research focuses on addressing the impact of temperature changes on the building cooling load in 10 major cities across the Western United States and Canada. Our results have shown that by the mid-century, building yearly energy consumption and peak load will increase in the Southwest. Moreover, the peak load months will spread out to not only the summer months but also spring and autumn months. The Pacific Northwest will experience more hot days in the summer months. The penetration of the air conditioning (a/c) system in this area is likely to increase significantly over the years. As a result, some locations in the Pacific Northwest may be shifted from winter peaking to summer peaking. Overall, the Western U.S. grid may see more simultaneous peaks across the North and South in summer months. Increased cooling load will result in a significant increase in the motor load, which consumes more reactive power and requires stronger voltage support from the grid. This study suggests an increasing need for the industry to implement new technology to increase the efficiency of temperature-sensitive loads and apply proper protection and control to prevent possible adverse impacts of a/c motor loads.

Lu, Ning; Taylor, Zachary T.; Jiang, Wei; Xie, YuLong; Leung, Lai R.; Correia, James; Wong, Pak C.; Mackey, Patrick S.; Paget, Maria L.

2008-09-30T23:59:59.000Z

211

Impact of Wind Energy on Hourly Load Following Requirements: An Hourly and Seasonal Analysis; Preprint  

Science Conference Proceedings (OSTI)

The impacts of wind energy on the power system grid can be decomposed into several time scales that include regulation, load following, and unit commitment. Techniques for evaluating the impacts on these time scales are still evolving, and as wind energy becomes a larger part of the electricity supply, valuable experience will be gained that will help refine these methods. Studies that estimated the impact of wind in the load following time scale found differing results and costs, ranging from near zero to approximately $2.50/megawatt-hour (MWh). Part of the reason for these differences is the different interpretation of the impacts that would be allocated to this ancillary service. Because of the low correlation between changes in load and wind, long-term analyses of the load following impact of wind may find low impacts. During the daily load cycle, there is a tremendous variability in load following requirements in systems without wind. When significant levels of wind generation are added to the resource mix, relatively small changes in wind output can complicate the task of balancing the system during periods of large load swings. This paper analyzes the load following impacts of wind by segregating these critical time periods of the day and separating the analysis by season. The analysis compares wind generation at geographically dispersed sites to wind generation based primarily at a single site, and for a large penetration of wind (more than 20% wind capacity to peak load).

Krich, A.; Milligan, M.

2005-05-01T23:59:59.000Z

212

1993 Pacific Northwest Loads and Resources Study.  

SciTech Connect

The Loads and Resources Study is presented in three documents: (1) this summary of Federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. In this loads and resources study, resource availability is compared with a range of forecasted electricity consumption. The forecasted future electricity demands -- firm loads -- are subtracted from the projected capability of existing and {open_quotes}contracted for{close_quotes} resources to determine whether Bonneville Power Administration (BPA) and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, and additional conservation, contract purchases, or generating resources will be needed to meet load growth. The Pacific Northwest Loads and Resources Study analyzes the Pacific Northwest`s projected loads and available generating resources in two parts: (1) the loads and resources of the Federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional power system, which includes loads and resource in addition to the Federal system. The loads and resources analysis in this study simulates the operation of the power system under the Pacific Northwest Coordination Agreement (PNCA) produced by the Pacific Northwest Coordinating Group. This study presents the Federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for Operating Years (OY) 1994--95 through 2003--04.

United States. Bonneville Power Administration.

1993-12-01T23:59:59.000Z

213

Low cutter load raise head  

SciTech Connect

A raise head having a multiplicity of cutters for enlarging a pilot hole into a larger diameter hole by disintegrating the earth formations that surround the pilot hole is provided that will require lower cutter loads to penetrate the formations being bored by directing the rock fracture planes toward the pilot hole forcing the rock to yield with less input energy. The cutters are positioned on the raise head to provide an earth formation contact profile with a major portion of said earth formation contact profile extending outward and upward from said pilot hole. The included angle between the major portion of the earth formation contact profile and the axis of the pilot hole is less than 90/sup 0/.

Saxman, W.C.

1981-03-31T23:59:59.000Z

214

Kinesin's backsteps under mechanical load  

E-Print Network (OSTI)

Kinesins move processively toward the plus end of microtubules by hydrolyzing ATP for each step. From an enzymatic perspective, the mechanism of mechanical motion coupled to the nucleotide chemistry is often well explained using a single-loop cyclic reaction. However, several difficulties arise in interpreting kinesin's backstepping within this framework, especially when external forces oppose the motion of kinesin. We review evidence, such as an ATP-independent stall force and a slower cycle time for backsteps, that has emerged to challenge the idea that kinesin backstepping is due to ATP synthesis, i.e., the reverse cycle of kinesin's forward-stepping chemomechanics. Supplementing the conventional single-loop chemomechanics with routes for ATP-hydrolyzing backward steps and nucleotide-free steps, especially under load, gives a better physical interpretation of the experimental data on backsteps.

Changbong Hyeon; Stefan Klumpp; José N. Onuchic

2009-04-18T23:59:59.000Z

215

Analysis Methodology for Industrial Load Profiles  

E-Print Network (OSTI)

A methodology is provided for evaluating the impact of various demand-side management (DSM) options on industrial customers. The basic approach uses customer metered load profile data as a basis for the customer load shape. DSM technologies are represented as load shapes and are used as a basis for altering the customers existing measured load shape. The impact of load shape changes on the customer is evaluated in terms of a change in the electric bill by using a software analytical tool called LOADEXPERT™. The software calculates the customer's bill for a particular rate structure and a given load shape. The output data from LOADEXPERT™ are used to calculate the rate of return on the DSM technology investment. Other uses of load profile data are provided.

Reddoch, T. W.

1991-06-01T23:59:59.000Z

216

High payload six-axis load sensor  

DOE Patents (OSTI)

A repairable high-payload six-axis load sensor includes a table, a base, and at least three shear-pin load transducers removably mounted between the table and the base. Removable mounting permits easy replacement of damaged shear pins. Preferably, the shear-pin load transducers are responsive to shear forces imparted along the two axes perpendicular to an axis of minimum sensitivity characteristic of the transducer. Responsive to an applied shear force, each shear-pin load transducer can produce an electrical signal proportional to the reaction force. The load sensor can further include a structure for receiving the proportional electrical signals and computing the applied load corresponding to the proportional electrical signals. The computed load can be expressed in terms of a three-dimensional XYZ Cartesian coordinate system.

Jansen, John F. (Knoxville, TN); Lind, Randall F. (Knoxville, TN)

2003-01-01T23:59:59.000Z

217

A Novel Approach to Determining Motor Load  

E-Print Network (OSTI)

Properly sized electric motors are essential if industrial plant efficiency is to be optimized and energy costs minimized. Because of the difficulty in making power measurements on three phase motors, loading is rarely, if ever, checked. A simple indication of motor load can be achieved by measuring operating speed because speed and load are almost linearly related. The decrease in motor speed from no load conditions, referred to as slip, can be determined with a non-contact, optical tachometer. Field measurements of motor slip were conducted at a textile plant to quantify motor load conditions. To verify the relationship between operating speed and load, measurements of motor power consumption on a representative number of motors were also conducted. The results of the motor survey, including number of motors, size, and load, are summarized in this paper along with an estimate of the savings from replacing oversized motors.

Brown, M.

1992-04-01T23:59:59.000Z

218

CO2 Emissions - United Korea  

NLE Websites -- All DOE Office Websites (Extended Search)

Fossil Fuel CO2 Emissions Regional Centrally Planned Asia United Korea CO2 Emissions from United Korea Data graphic Data CO2 Emissions from United Korea...

219

BNL United Way Campaign  

NLE Websites -- All DOE Office Websites (Extended Search)

about Long Island issues and challenges. Because we care, we come together to raise money towards The United Way of Long Island, which provides "services to children and...

220

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to this report. INTRODUCTION AND OBJECTIVE The European Laboratory for Particle Physics, CERN, in collaboration with the United States (U.S.) and other non-member states,...

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Redefining the SI Units  

Science Conference Proceedings (OSTI)

... and accuracy, simplify and normalize the unit definitions, and liberate the system from dependence on the prototype kilogram, an artifact adopted in ...

2013-06-24T23:59:59.000Z

222

Base unit definitions: Kilogram  

Science Conference Proceedings (OSTI)

... Unit of mass (kilogram), Abbreviations: CGPM, CIPM, BIPM. At the end of the 18th century, a kilogram was the mass of a cubic decimeter of water. ...

223

United States Patent  

NLE Websites -- All DOE Office Websites (Extended Search)

( 1 of 1 ) United States Patent 6,994,831 Gentile , et al. February 7, 2006 Oxidative tritium decontamination system Abstract The Oxidative Tritium Decontamination System, OTDS,...

224

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

0 Appliances in Homes in South Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"South Census Region" ,,,"South Atlantic Census Division",,,,,,"East South...

225

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

8 Home Appliances in Homes in Northeast Region, Divisions, and States, 2009" " Million Housing Units, Final" ,,"Northeast Census Region" ,,,"New England Census Division",,,"Middle...

226

Rooftop Unit Campaign  

NLE Websites -- All DOE Office Websites (Extended Search)

919-943-7291 April 4, 2013 BTO Program Review 2 | Building Technologies Office eere.energy.gov Purpose & Objectives - Problem Statement * Packaged rooftop units (RTUs)...

227

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

'OQOl - United States Government - Department of Energy National Nuclear Security Administration memorandum January 19, 201 1 DATE. REPLY TO ATTN OF: Y12-60:Gorman SUBJECT ANNUAL...

228

UnitOverview  

NLE Websites -- All DOE Office Websites (Extended Search)

UNIT OVERVIEW A general overview of LHC physics, accelerator and detector design, and how data inform claims and reasoning begins with an exploration of the "Big Questions" that...

229

Final Report: Particulate Emissions Testing, Unit 1, Potomac River  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Report: Particulate Emissions Testing, Unit 1, Potomac River Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia Docket No. EO-05-01: TRC Environmental Corporation (TRC) of Lowell, Massachusetts was retained by Mirant Potomac River, LLC (Mirant) to provide sampling and analytical support in completing a Particulate Emission Test of Unit 1 of the Potomac River generating facility. The Test Program at the Potomac facility involved the completion of two series of emissions tests for particulate matter (PM), the first during normal unit operation and the second with the injection of TRONA upstream of hot side ESP fields. All tests were completed while Unit 1 was operating at 90% of full load (84MW)

230

United Nations Environment Programme (UNEP) | Open Energy Information  

Open Energy Info (EERE)

United Nations Environment Programme (UNEP) United Nations Environment Programme (UNEP) (Redirected from United Nations Environment Programme) Jump to: navigation, search Logo: United Nations Environment Programme Name United Nations Environment Programme Address United Nations Avenue, Gigiri PO Box 30552, 00100 Place Nairobi, Kenya Phone number (254-20) 7621234 Coordinates -1.23224986037°, 36.815630436° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-1.23224986037,"lon":36.815630436,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

231

Investigation of residential central air conditioning load shapes in NEMS  

E-Print Network (OSTI)

of Residential Central Air Conditioning Load Shapes in NEMSof Residential Central Air Conditioning Load Shapes in NEMSof Residential Central Air Conditioning Load Shapes in NEMS

Hamachi LaCommare, Kristina; Marnay, Chris; Gumerman, Etan; Chan, Peter; Rosenquist, Greg; Osborn, Julie

2002-01-01T23:59:59.000Z

232

Wind loading on solar collectors  

DOE Green Energy (OSTI)

The present design methodology for the determination of wind loading on the various solar collectors has been reviewed and assessed. The total force coefficients of flat plates of aspect ratios 1.0 and 3.0, respectively, at various angles of attack obtained by using the guidelines of the ANSI A58.1-1982, have been compared with those obtained by using the methodology of the ASCE Task Committee, 1961, and the experimental results of the full-scale test of heliostats by Peglow. The turbulent energy spectra, currently employed in the building code, are compared with those of Kaimal et al., Lumley, and Ponofsky for wind velocities of 20.0 m/s and 40.24 m/s at an elevation of 9.15 m. The longitudinal spectra of the building code overestimates the Kaimal spectra in the frequency range of 0.007 Hz to 0.08 Hz and underestimates beyond the frequency of 0.08 Hz. The peak angles of attack, on the heliostat, stowed in horizontal position, due to turbulent vertical and lateral components of wind velocity, have been estimated by using Daniel's methodology for three wind velocities and compared with the value suggested by the code. The experimental results of a simple test in the laboratory indicate the feasibility of decreasing the drag forces of the flat plate by reducing the solidity ratio.

Bhaduri, S.; Murphy, L.M.

1985-06-01T23:59:59.000Z

233

Profile Guided Load Marking for Memory Renaming  

E-Print Network (OSTI)

Memory operations remain a significant bottleneck in dynamically scheduled pipelined processors, due in part to the inability to statically determine the existence of memory address dependencies. Hardware memory renaming techniques have been proposed which predict which stores a load might be dependent upon. These prediction techniques can be used to speculatively forward a value from a predicted store dependency to a load through a value prediction table; however, these techniques require large and time-consuming hardware tables. In this paper we propose a software-guided approach for identifying dependencies between store and load instructions and the Load Marking (LM) architecture to communicate these dependencies to the hardware. Compiler analysis and profiles are used to find important store/load relationships, and these relationships are identified during execution via hints or an n-bit tag. For those loads that are not marked for renaming, we then use additional profiling inform...

Glenn Reinman; Brad Calder; Dean Tullsen; Gary Tyson; Todd Austin

1998-01-01T23:59:59.000Z

234

Assessment of Industrial-Sector Load Shapes  

Science Conference Proceedings (OSTI)

The load shapes of industrial-sector customers are becoming increasingly important for utility forecasting, marketing, and demand-side management planning and evaluation activities. This report analyzes load shapes for various industry segments and investigates the transfer of these load shapes across service territories. This report is available only to funders of Program 101A or 101.001. Funders may download this report at http://my.primen.com/Applications/DE/Community/index.asp .

1993-02-18T23:59:59.000Z

235

Trends in electric utility load duration curves  

SciTech Connect

This report documents the development and analysis of annual and quarterly load duration curves for each of the 10 Federal regions. The report describes analyses performed to test for changes in load duration curve shapes over time. These analyses are intended to aid the electric utility analyses and modeling activities of the Energy Information Administration (EIA) by expanding the understanding of current and expected load duration curve shapes. 7 figs., 13 tabs.

1984-12-01T23:59:59.000Z

236

Loads, capacity, and failure rate modeling  

SciTech Connect

Both failure rate and load capacity (stress-strength) interferenece methodologies are employed in the reliability analysis at nuclear facilities. Both of the above have been utilized in a heuristic failure rate model in terms of load capacity inference. Analytical solutions are used to demonstrate that infant mortality and random aging failures may be expressed implicity in terms of capacity variability, load variability, and capacity deterioration, and that mode interactions play a role in the formation of the bathtub curve for failure rates.

Lewis, E.E.; Chen, Hsin-Chieh

1994-12-31T23:59:59.000Z

237

Reservoir compaction loads on casings and liners  

Science Conference Proceedings (OSTI)

Pressure drawdown due to production from a reservoir causes compaction of the reservoir formation which induces axial and radial loads on the wellbore. Reservoir compaction loads increase during the production life of a well, and are greater for deviated wells. Presented here are casing and liner loads at initial and final pressure drawdowns for a particular reservoir and at well deviation angles of 0 to 45 degrees.

Wooley, G.R.; Prachner, W.

1984-09-01T23:59:59.000Z

238

NORMAL LOAD BEARING BY SITE SPECIFIC CANISTER  

Science Conference Proceedings (OSTI)

The overall purpose of this calculation is to perform a preliminary analysis of the Site Specific Canister/Basket, subject to static gravity loads that include the self weight of the Canister Shell, the Basket, the Spent Nuclear Fuel, the Shield Plug and the related hardware, so that the loads are approximately known for sizing purposes. Based on these loads the stress levels in various components of the Site Specific Canister/Basket are evaluated.

NA

2005-03-23T23:59:59.000Z

239

Measured Peak Equipment Loads in Laboratories  

SciTech Connect

This technical bulletin documents measured peak equipment load data from 39 laboratory spaces in nine buildings across five institutions. The purpose of these measurements was to obtain data on the actual peak loads in laboratories, which can be used to rightsize the design of HVAC systems in new laboratories. While any given laboratory may have unique loads and other design considerations, these results may be used as a 'sanity check' for design assumptions.

Mathew, Paul A.

2007-09-12T23:59:59.000Z

240

1991 Pacific Northwest Loads and Resources Study.  

SciTech Connect

This study establishes the Bonneville Power Administration's (BPA) planning basis for supplying electricity to BPA customers. The Loads and Resources Study is presented in three documents: (1) this summary of federal system and Pacific Northwest region loads and resources; (2) a technical appendix detailing forecasted Pacific Northwest economic trends and loads, and (3) a technical appendix detailing the loads and resources for each major Pacific Northwest generating utility. This analysis updates our 1990 study. BPS's long-range planning incorporates resource availability with a range of forecasted electrical consumption. The forecasted future electrical demands-firm loads--are subtracted from the projected capability of existing resources to determine whether BPA and the region will be surplus or deficit. If resources are greater than loads in any particular year or month, there is a surplus of energy and/or capacity, which BPA can sell to increase revenues. Conversely, if firm loads exceed available resources, there is a deficit of energy and/or capacity, then additional conservation, contract purchases, or generating resources will be needed to meet load growth. This study analyzes the Pacific Northwest's projected loads and available generating resources in two parts: (1) the loads and resources of the federal system, for which BPA is the marketing agency; and (2) the larger Pacific Northwest regional profile, which includes loads and resources in addition to the federal system. This study presents the federal system and regional analyses for five load forecasts: high, medium-high, medium, medium-low, and low. This analysis projects the yearly average energy consumption and resource availability for 1992- 2012.

United States. Bonneville Power Administration.

1991-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

OpenEI Community - load profile  

Open Energy Info (EERE)

/0 en Commercial and /0 en Commercial and Residential Hourly Load Data Now Available on OpenEI! http://en.openei.org/community/blog/commercial-and-residential-hourly-load-data-now-available-openei <span class=Load data" src="http://en.openei.org/community/files/load_data_figure_small.jpg" style="width:527px; height:285px" title="" />Image source: NREL 

Files: 
application/zip icon

242

Load relaxation studies of zircaloy-4  

SciTech Connect

The results of the present work have shown (1) the load relaxation data of Zircaloy-4 in the temperature range of 200/sup 0/C to 385/sup 0/C can be represented by the phenomenological model based on Hart's plastic equation of state; (2) the room temperature load relaxation data reflect the effects of deformation twinning; (3) at higher temperatures the load relaxation data suggest the contribution of grain boundary sliding; and (4) the effects of strain aging can be identified based on the load relaxation data.

Huang, F.H.; Sabol, G.P.; McDonald, S.G.; Li, C.Y.

1976-01-01T23:59:59.000Z

243

Effect of Nonproportional Loadings on Ductile Fracture  

Science Conference Proceedings (OSTI)

Abstract Scope, This study aims at understanding the effects of load path ... D-2: Forging of Magnesium Alloy by Impulsive Energy at Room Temperature.

244

NREL: Vehicle Ancillary Loads Reduction - Laboratory Capabilities  

NLE Websites -- All DOE Office Websites (Extended Search)

VALR Lab. NREL's Vehicle Ancillary Loads Reduction Laboratory houses ADAM, our advanced thermal manikin, as well as a passenger compartment climate simulator, testing equipment...

245

Thermoplastic Flour Containing Eugenol-loaded Chitosan ...  

Science Conference Proceedings (OSTI)

Presentation Title, Thermoplastic Flour Containing Eugenol-loaded Chitosan ... Properties of AA 7075 Reinforced with Nanometric ZrO2 Obtained by Ball-milling.

246

Building Energy Software Tools Directory: Load Express  

NLE Websites -- All DOE Office Websites (Extended Search)

Create project files with Load Express in just 4 easy steps. Select a weather profile, enter simulation parameters, define the zonesrooms in the building and create air handler...

247

Summary Max Total Units  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Max Total Units Max Total Units *If All Splits, No Rack Units **If Only FW, AC Splits 1000 52 28 28 2000 87 59 35 3000 61 33 15 4000 61 33 15 Totals 261 153 93 ***Costs $1,957,500.00 $1,147,500.00 $697,500.00 Notes: added several refrigerants removed bins from analysis removed R-22 from list 1000lb, no Glycol, CO2 or ammonia Seawater R-404A only * includes seawater units ** no seawater units included *** Costs = (total units) X (estimate of $7500 per unit) 1000lb, air cooled split systems, fresh water Refrig Voltage Cond Unit IF-CU Combos 2 4 5 28 References Refrig Voltage C-U type Compressor HP R-404A 208/1/60 Hermetic SA 2.5 R-507 230/1/60 Hermetic MA 2.5 208/3/60 SemiHerm SA 1.5 230/3/60 SemiHerm MA 1.5 SemiHerm HA 1.5 1000lb, remote rack systems, fresh water Refrig/system Voltage Combos 12 2 24 References Refrig/system Voltage IF only

248

Composite stabilizer unit  

DOE Patents (OSTI)

This invention is comprised of an improved fin stabilized projectile including multiple stabilizer fins upon a stabilizer unit situated at the aft end of the projectile is provided, the improvement wherein the stabilizer fins are joined into the stabilizer unit by an injection molded engineering grade polymer.

Ebaugh, L.R.; Sadler, C.P.; Carter, G.D.

1990-12-31T23:59:59.000Z

249

Composite stabilizer unit  

DOE Patents (OSTI)

This invention is comprised of an improved fin stabilized projectile including multiple stabilizer fins upon a stabilizer unit situated at the aft end of the projectile is provided, the improvement wherein the stabilizer fins are joined into the stabilizer unit by an injection molded engineering grade polymer.

Ebaugh, L.R.; Sadler, C.P.; Carter, G.D.

1990-01-01T23:59:59.000Z

250

Composite stabilizer unit  

SciTech Connect

An improved fin stabilized projectile including multiple stabilizer fins upon a stabilizer unit situated at the aft end of the projectile is provided, the improvement wherein the stabilizer fins are joined into the stabillizer unit by an injection molded engineering grade polymer.

Ebaugh, Larry R. (Los Alamos, NM); Sadler, Collin P. (Los Alamos, NM); Carter, Gary D. (Espanola, NM)

1992-01-01T23:59:59.000Z

251

Associative list processing unit  

SciTech Connect

An associative list processing unit and method comprising employing a plurality of prioritized cell blocks and permitting inserts to occur in a single clock cycle if all of the cell blocks are not full. Also, an associative list processing unit and method comprising employing a plurality of prioritized cell blocks and using a tree of prioritized multiplexers descending from the plurality of cell blocks.

Hemmert, Karl Scott; Underwood, Keith D.

2013-01-29T23:59:59.000Z

252

Standby Generators for North Portal Electrical Loads (SCPB:N/A)  

DOE Green Energy (OSTI)

The purpose and objective of this design analysis is to establish the best and most economical way to provide standby power generation required for the North Portal loads. This analysis calculates the size and number of the new standby generators that will supplement the already-specified four 500 kW diesel generator units (7007-GN-401, -402, -403, and -404).

Y.D. Shane

1995-03-31T23:59:59.000Z

253

Balanced binary trees for ID management and load balance in distributed hash tables  

Science Conference Proceedings (OSTI)

We present a low-cost, decentralized algorithm for ID management in distributed hash tables (DHTs) managed by a dynamic set of hosts. Each host is assigned an ID in the unit interval [0, 1). At any time, the set of IDs splits the interval into disjoint ... Keywords: DHT, ID management, P2P, binary tree, distributed hash table, load balance, peer to peer

Gurmeet Singh Manku

2004-07-01T23:59:59.000Z

254

Modeling Utility Load and Temperature Relationships for Use with Long-Lead Forecasts  

Science Conference Proceedings (OSTI)

Models relating system-wide average temperature to total system load were developed for the Virginia Power and Duke Power service areas in the southeastern United States. Daily data for the 1985–91 period were used. The influence of temperature ...

Peter J. Robinson

1997-05-01T23:59:59.000Z

255

Optimizing Process Loads in Industrial Cogeneration Energy Systems  

E-Print Network (OSTI)

Optimum dispatch of energy supply systems can result in large savings in industrial facilities. Identifying the configuration of available equipment, and its loading to minimize total energy consumption to satisfy given load demands, has very high payback potential. This paper discusses an approach to determine integrated energy supply and end use optimum equipment dispatch to simultaneously satisfy given power, process steam and additional "end energy" product needs such as compressed fluids, chemical unit production, etc. Techniques applied to power generation and industrial cogeneration are extended to solving this trigeneration problem where the optimum dispatch of the final load devices (i.e. compressors, fans, pumps, etc.) are an integral part of the total energy system optimization. An example industrial trigeneration system is discussed to illustrate the application and procedures. The methods of considering alternate energy sources, for end use optimization with export power and steam generation will be illustrated. The savings associated with operations optimization readily justify the hardware and software costs required for implementation of Optimization Energy Management Systems (OEMS). An OEMS capability for this application is briefly discussed.

Ahner, D. J.; Babson, P. E.

1995-04-01T23:59:59.000Z

256

Transformers for explosive pulsed power coupling to various loads  

SciTech Connect

Tape-wound step-up transformers have been fabricated and used with magnetic flux compression generators in the past with effective coupling coefficients of approx.0.76. We have attempted to design some units with coefficients in the range of 0.85 to 0.92 by taking advantage of newer dielectrics. The intent is to raise the voltage stress from less than or equal to 0.39 MV/cm to the range of 0.98 to 1.97 MV/cm. This has the effect of making the secondary thinner and permitting a higher coupling efficiency. Several designs for coupling the 13.2-cm-wide by 52.8-cm-long plate generator to loads in the range of 10 to 30 ..cap omega.. with an output of approx.1 MV have been studied. These designs must take into account that the primary of the transformer is switched into the circuit as a load in parallel with the generator's ballast inductor. A final design examines the constraints imposed by attempting to transform the output of a plate generator up to 10 MV into a high impedance load. A voltage stress of 3.9 MV/cm is required in this particular design for 140 kV per turn in the secondary winding.

Freeman, B.L.; Bostick, W.H.

1986-01-01T23:59:59.000Z

257

Building Energy Software Tools Directory : HVAC Residential Load...  

NLE Websites -- All DOE Office Websites (Extended Search)

HVAC Residential Load Calcs HD for the iPad Back to Tool HVAC Residential Load Calcs HD screenshot HVAC Residential Load Calcs HD screenshot HVAC Residential Load Calcs HD...

258

Methods for Analyzing Electric Load Shape and its Variability  

E-Print Network (OSTI)

15 Figure 12: Load profile by day of week, averaged over thebetween the average load profile and the profile of a givenfrom the average load profile. Figure 12: Load profile by

Price, Philip

2010-01-01T23:59:59.000Z

259

Window solar heating unit  

SciTech Connect

The unit may be mounted either in a window or between the studs of a building that is to be supplied with solar heat. The bottom of the unit extends farther from the building than the top and is wider than the top of the unit such that the transparent side away from the building has an arcuate form and is gradually flared outwardly in a downward direction to increase the exposure to the sun during the day. A plurality of absorptive tubes within the unit are slanted from the upper portion of the unit downwardly and outwardly to the front arcuate portion of the bottom. Openings between the unit and the building are provided for air flow, and a thermostatically controlled fan is mounted in one of the openings. A baffle is mounted between the absorptive tubes and the mounting side of the solar heating unit, and the surfaces of the baffle and the absorptive tubes are painted a dull black for absorbing heat transmitted from the sun through the transparent, slanting side.

Davis, E.J.

1978-09-12T23:59:59.000Z

260

Decentralized agent-based underfrequency load shedding  

Science Conference Proceedings (OSTI)

As part of the transition to a smart grid efforts are being made to decentralize control of electric power systems and modernize protection schemes that are currently in use. One specific application of distributed control is underfrequency load shedding ... Keywords: UFLS, Underfrequency load shedding, intelligent agents

Sara Mullen; Getiria Onsongo

2010-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Quantifying the effectiveness of load balance algorithms  

Science Conference Proceedings (OSTI)

Load balance is critical for performance in large parallel applications. An imbalance on today's fastest supercomputers can force hundreds of thousands of cores to idle, and on future exascale machines this cost will increase by over a factor of a thousand. ... Keywords: framework, load balance, modeling, performance, simulation

Olga Pearce; Todd Gamblin; Bronis R. de Supinski; Martin Schulz; Nancy M. Amato

2012-06-01T23:59:59.000Z

262

Protecting consumer privacy from electric load monitoring  

Science Conference Proceedings (OSTI)

The smart grid introduces concerns for the loss of consumer privacy; recently deployed smart meters retain and distribute highly accurate profiles of home energy use. These profiles can be mined by Non Intrusive Load Monitors (NILMs) to expose much of ... Keywords: load monitor, privacy, smart meter

Stephen McLaughlin; Patrick McDaniel; William Aiello

2011-10-01T23:59:59.000Z

263

Apparatus for loading a band saw blade  

DOE Patents (OSTI)

A band saw blade is loaded between pairs of guide wheels upon tensioning the blade by guiding the blade between pairs of spaced guide plates which define converging slots that converge toward the guide wheels. The approach is particularly useful in loading blades on underwater band saw machines used to cut radioactive materials. 2 figs.

Reeves, S.R.

1990-03-20T23:59:59.000Z

264

Design Ground Snow Loads for Ohio  

Science Conference Proceedings (OSTI)

The weight of snow with a mean recurrence interval of 50 years, called the design ground snow load, is used by engineers and planners to estimate the weight of snow that roofs must be designed to support National maps of ground snow load have ...

Thomas W. Schmidlin; Dennis J. Edgell; Molly A. Delaney

1992-06-01T23:59:59.000Z

265

Load Modeling Using a Measurement Based Approach  

Science Conference Proceedings (OSTI)

This report summarizes the work performed in the second phase of a multi-year collaborative load modeling research program that was initiated in 2004. The measurement based approach described in this report will help utilities to develop representative load models using suitable measurement data.

2007-12-17T23:59:59.000Z

266

Household type load's effects on photovoltaic systems  

Science Conference Proceedings (OSTI)

The solar energy is one of the most important energy sources available because, besides the fact that it is not polluting the environment and it helps to the reduction of green house effect, it is free of charge and it can be easily converted to other ... Keywords: A.C. loads, D.C. loads, compact fluorescent lamp, photovoltaic system, power LED

Nazmi Ekren; Nevzat Onat; Safak Saglam

2008-12-01T23:59:59.000Z

267

Apparatus for loading a band saw blade  

DOE Patents (OSTI)

A band saw blade is loaded between pairs of guide wheels upon tensioning the blade by guiding the blade between pairs of spaced guide plates which define converging slots that converge toward the guide wheels. The approach is particularly useful in loading blades on underwater band saw machines used to cut radioactive materials.

Reeves, Steven R. (49 Williams Ave., West Valley, NY 14171)

1990-01-01T23:59:59.000Z

268

The Promise of Load Balancing the Parameterization of Moist Convection Using a Model Data Load Index  

Science Conference Proceedings (OSTI)

The parameterization of physical processes in atmospheric general circulation models contributes to load imbalances among individual processors of message-passing distributed-multiprocessor systems. Load imbalances increase the overall time to ...

S. P. Muszala; D. A. Connors; J. J. Hack; G. Alaghband

2006-04-01T23:59:59.000Z

269

Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-  

E-Print Network (OSTI)

, and the Office of Electricity Delivery and Energy Reliability, Permitting, Siting and Analysis of the ULBNL-63728 Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non .............................................................................................................. 9 4. Baseline Profile (BLP) Models

270

Independent review of estimated load reductions for PJM's small customer load response pilot project  

E-Print Network (OSTI)

Abbreviations ADDF ALM AMR CSP DOE DR ELRP ETS EWH FERC HVa Curtailment Service Provider (CSP) at PJM’s request. LBNLof load control tests. The CSP collected hourly load data

Heffner, G.; Moezzi, M.; Goldman, C.

2004-01-01T23:59:59.000Z

271

Next Generation Rooftop Unit  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Next Generation Rooftop Unit - Next Generation Rooftop Unit - CRADA Bo Shen Oak Ridge National Laboratory shenb@ornl.gov; 865-574-5745 April 3, 2013 ET R&D project in support of DOE/BTO Goal of 50% Reduction in Building Energy Use by 2030. CRADA project with Trane TOP US Commercial HVAC Equipment OEM 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: half of all US commercial floor space cooled by packaged AC units, consumes more than 1.0 Quad source energy/year; highly efficient systems needed

272

Next Generation Rooftop Unit  

NLE Websites -- All DOE Office Websites (Extended Search)

Next Generation Rooftop Unit - Next Generation Rooftop Unit - CRADA Bo Shen Oak Ridge National Laboratory shenb@ornl.gov; 865-574-5745 April 3, 2013 ET R&D project in support of DOE/BTO Goal of 50% Reduction in Building Energy Use by 2030. CRADA project with Trane TOP US Commercial HVAC Equipment OEM 2 | Building Technologies Office eere.energy.gov Purpose & Objectives Problem Statement: half of all US commercial floor space cooled by packaged AC units, consumes more than 1.0 Quad source energy/year; highly efficient systems needed

273

Combi Systems for Low Load homes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

text styles text styles Combi Systems for Low Load Homes Center for Energy and Environment, NorthernSTAR, Ben Schoenbauer * Low load homes are more common than ever. * Typical space heating and DHW equipment have capacities larger than necessary * A single heating plant could provide high efficiency heat at lower costs, increased durability and improved combustion safety Context Technical Approach * A condensing water heater and hydronic air handler will used to provide space and water heating loads in almost 300 weatherized homes. * System specifications, sizing, and installation optimization guidelines were all developed. * Contractor capability was developed in MN market, but may not be developed in all local. 4 Recommended Guidance * Determine peak load on system: - Space heating design load (ie 40,000 Btu/hr)

274

Plug Load Energy Analysis: The Role of Plug Loads in LEED Certification  

E-Print Network (OSTI)

benchmark and is bound to change as the proportion of plug load energy use grows in commercial buildings.

Fuertes, Gwen; Schiavon, Stefano

2013-01-01T23:59:59.000Z

275

United States of Agriculture  

E-Print Network (OSTI)

depend on vari- ous factors: engine temperature and load, aftertreatment de- vices and dilution-11545-2010 © Author(s) 2010. CC Attribution 3.0 License. Atmospheric Chemistry and Physics Impact of aftertreatment aftertreatment systems. One vehicle lacked exhaust aftertreatment devices, one ve- hicle was equipped

276

Using Utility Load Data to Estimate Demand for Space Cooling and Potential for Shiftable Loads  

SciTech Connect

This paper describes a simple method to estimate hourly cooling demand from historical utility load data. It compares total hourly demand to demand on cool days and compares these estimates of total cooling demand to previous regional and national estimates. Load profiles generated from this method may be used to estimate the potential for aggregated demand response or load shifting via cold storage.

Denholm, P.; Ong, S.; Booten, C.

2012-05-01T23:59:59.000Z

277

An Analysis of Load Balancing Technology - Comparing LSF with other Load Balancing Software Packages  

E-Print Network (OSTI)

This paper examines what the load balancing needs of organizations are today, the solution LSF (Load Sharing Facility) provides for them, and how other currently available load balancing products compare to LSF. Jean Suplick (suplick@cxsoft.convex.com) CXSOFT Richardson, Texas January 1994 Why clusters?

Jean Suplick

1994-01-01T23:59:59.000Z

278

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

the 2009 Poverty Guidelines for families published by the U.S. Department of Health and Human Services. 3Use of heating equipment for another housing unit also includes the use...

279

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

that do not contain a storage tank. The water is only heated as it passes through the heat exchanger. 3Use of a water heater for another housing unit also includes the use of...

280

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

that do not contain a storage tank. The water is only heated as it passes through the heat exchanger. 4Use of a water heater for another housing unit also includes the use of...

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

United Cool Air  

Energy.gov (U.S. Department of Energy (DOE))

While our process may start with a "basic model" it is seldom that we fabricate more than a few units that are identical.  Therefore, the definition of "basic model" has a large impact on the...

282

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

5 Appliances in U.S. Homes, by Household Income, 2009" " Million Housing Units, Final" ,,"Household Income" ,"Total U.S.1 (millions)",,,"Below Poverty Line2" ,,"Less than...

283

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

3 Appliances in U.S. Homes, by Year of Construction, 2009" " Million Housing Units, Final" ,,"Year of Construction" ,"Total U.S.1 (millions)" ,,"Before 1940","1940 to 1949","1950...

284

" Million Housing Units, Final...  

U.S. Energy Information Administration (EIA) Indexed Site

6 Appliances in U.S. Homes, by Climate Region, 2009" " Million Housing Units, Final" ,,"Climate Region2" ,"Total U.S.1 (millions)" ,,"Very Cold","Mixed- Humid","Mixed-Dry"...

285

United States Government  

Office of Legacy Management (LM)

"- .-A*" (MQ) EfG (07-W) United States Government rrla.g-a Department of Energy memorandum DATE: tlEC 1 F: l??? REPLYTo EM-421 (W. A. W illiams , 903-8149) AJTN OF: SUBJECT:...

286

Microsoft Word - Final Update 6 - UNits 345.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 to: 6 to: A Dispersion Modeling Analysis of Downwash from Mirant's Potomac River Power Plant Modeling Baseload Units 3,4,5 ENSR Corporation January 13, 2006 Document Number 10350-002-420 (Update 6) January, 2006 1-1 1.0 INTRODUCTION This report describes dispersion modeling performed for simultaneous operation of three baseload units at Mirant's Potomac River Generating Station (PRGS). The units (3,4,5) would operate at maximum load (107 MW) for up to 12 hours and minimum load (35 MW) 12 hours or more in a calendar day. This mode of operation is also referred to as Option B in Mirant Potomac River LLC's December 30, 2005 letter to the U.S. Department of Energy regarding District of Columbia Public Service Commission, Docket No. EO-05-01. The modeling was performed according to the Protocol

287

United States Geological Survey | Open Energy Information  

Open Energy Info (EERE)

Survey Survey Jump to: navigation, search Logo: United States Geological Survey Name United States Geological Survey Address USGS National Center 12201 Sunrise Valley Drive Place Reston, VA Zip 20192 Region Northeast - NY NJ CT PA Area Year founded 1879 Phone number 703-648-5953 Website http://www.usgs.gov/ Coordinates 38.947077°, -77.370315° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.947077,"lon":-77.370315,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

288

United Energy Group PLC | Open Energy Information  

Open Energy Info (EERE)

Energy Group PLC Energy Group PLC Jump to: navigation, search Name United Energy Group PLC Place Haslemere, United Kingdom Sector Hydro, Wind energy Product The company develops small hydro, gas co-generation and wind projects in Serbia and the Serbian part of Bosnia Coordinates 51.08879°, -0.708724° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.08879,"lon":-0.708724,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

289

United Kingdom: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

United Kingdom: Energy Resources United Kingdom: Energy Resources Jump to: navigation, search Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"390px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.378051,"lon":-3.435973,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

290

United States Forest Service | Open Energy Information  

Open Energy Info (EERE)

Logo: United States Forest Service Name United States Forest Service Short Name USFS Address 1400 Independence Ave., SW Place Washington, D.C. Zip 20250-1111 Year founded 1905 Website http://www.fs.fed.us/ Coordinates 38.887546°, -77.032038° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.887546,"lon":-77.032038,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

291

United States Forest Service | Open Energy Information  

Open Energy Info (EERE)

Service Service (Redirected from USFS) Jump to: navigation, search Logo: United States Forest Service Name United States Forest Service Short Name USFS Address 1400 Independence Ave., SW Place Washington, D.C. Zip 20250-1111 Year founded 1905 Website http://www.fs.fed.us/ Coordinates 38.887546°, -77.032038° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.887546,"lon":-77.032038,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

292

United States Coast Guard | Open Energy Information  

Open Energy Info (EERE)

Coast Guard Coast Guard Jump to: navigation, search Logo: United States Coast Guard Name United States Coast Guard Address 2100 2nd ST SW Place Washington, District of Columbia Zip 20598 Phone number 202-372-4411 Website http://www.uscg.mil/default.as Coordinates 38.8645267°, -77.013525° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.8645267,"lon":-77.013525,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

293

Variability of Load and Net Load in Case of Large Scale Distributed Wind Power  

Science Conference Proceedings (OSTI)

Large scale wind power production and its variability is one of the major inputs to wind integration studies. This paper analyses measured data from large scale wind power production. Comparisons of variability are made across several variables: time scale (10-60 minute ramp rates), number of wind farms, and simulated vs. modeled data. Ramp rates for Wind power production, Load (total system load) and Net load (load minus wind power production) demonstrate how wind power increases the net load variability. Wind power will also change the timing of daily ramps.

Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Gomez-Lazaro, E.; Rawn, B.; Dobschinski, J.; Meibom, P.; Lannoye, E.; Aigner, T.; Wan, Y. H.; Milligan, M.

2011-01-01T23:59:59.000Z

294

Sensible and Latent Cooling Load Control Using Centrally-Ducted, Variable-Capacity Space Conditioning Systems in Low Sensible Load Environments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sensible and Latent Cooling Load Control Using Centrally-Ducted, Variable-Capacity Space Conditioning Systems in Low Sensible Load Environments James Cummings BA-PIRC; Florida Solar Energy Center Presented at BA Summer Meeting, July 26, 2012 The gist of my message * Fixed capacity AC systems generally provide good RH control in typical residences. * In low-load homes, they may be less effective in achieving good RH control. * On the other hand, variable capacity AC systems have several characteristics which can provide improved RH control in homes. - Both Nordyne and Carrier have variable capacity units, varying from about 40% to 100% of nominal full capacity. - What is variable capacity? -- condenser fan, compressor speed, and AHU fan speed. The gist, continued

295

Dehumidification and cooling loads from ventilation air  

SciTech Connect

The importance of controlling humidity in buildings is cause for concern, in part, because of indoor air quality problems associated with excess moisture in air-conditioning systems. But more universally, the need for ventilation air has forced HVAC equipment (originally optimized for high efficiency in removing sensible heat loads) to remove high moisture loads. To assist cooling equipment and meet the challenge of larger ventilation loads, several technologies have succeeded in commercial buildings. Newer technologies such as subcool/reheat and heat pipe reheat show promise. These increase latent capacity of cooling-based systems by reducing their sensible capacity. Also, desiccant wheels have traditionally provided deeper-drying capacity by using thermal energy in place of electrical power to remove the latent load. Regardless of what mix of technologies is best for a particular application, there is a need for a more effective way of thinking about the cooling loads created by ventilation air. It is clear from the literature that all-too-frequently, HVAC systems do not perform well unless the ventilation air loads have been effectively addressed at the original design stage. This article proposes an engineering shorthand, an annual load index for ventilation air. This index will aid in the complex process of improving the ability of HVAC systems to deal efficiently with the amount of fresh air the industry has deemed useful for maintaining comfort in buildings. Examination of typical behavior of weather shows that latent loads usually exceed sensible loads in ventilation air by at least 3:1 and often as much as 8:1. A designer can use the engineering shorthand indexes presented to quickly assess the importance of this fact for a given system design. To size those components after they are selected, the designer can refer to Chapter 24 of the 1997 ASHRAE Handbook--Fundamentals, which includes separate values for peak moisture and peak temperature.

Harriman, L.G. III [Mason-Grant, Portsmouth, NH (United States); Plager, D. [Quantitative Decision Support, Portsmouth, NH (United States); Kosar, D. [Gas Research Inst., Chicago, IL (United States)

1997-11-01T23:59:59.000Z

296

Automatic Detection of Unsafe Component Loadings  

E-Print Network (OSTI)

Dynamic loading of software components (e.g., libraries or modules) is a widely used mechanism for improved system modularity and flexibility. Correct component resolution is critical for reliable and secure software execution, however, programming mistakes may lead to unintended or even malicious components to be resolved and loaded. In particular, dynamic loading can be hijacked by placing an arbitrary file with the specified name in a directory searched before resolving the target component. Although this issue has been known for quite some time, it was not considered serious because exploiting it requires access to the local file system on the vulnerable host. Recently such vulnerabilities started to receive considerable attention as their remote exploitation became realistic; it is now important to detect and fix these vulnerabilities. In this paper, we present the first automated technique to detect vulnerable and unsafe dynamic component loadings. Our analysis has two phases: 1) apply dynamic binary instrumentation to collect runtime information on component loading (online phase); and 2) analyze the collected information to detect vulnerable component loadings (offline phase). For evaluation, we implemented our technique to detect vulnerable and unsafe DLL loadings in popular Microsoft Windows software. Our results show that unsafe DLL loading is prevalent and can lead to serious security threats. Our tool detected more than 1,700 unsafe DLL loadings in 28 widely used software and discovered serious attack vectors for remote code execution. Microsoft has opened a Microsoft Security Response Center (MSRC) case on our reported issues and is working with us and other affected software vendors to develop necessary patches.

Taeho Kwon; Zhendong Su

2010-01-01T23:59:59.000Z

297

Load Data Analysis and PowerShape Training: Strategic Load Research and Advanced Topics in Load Profiling for Settlements  

Science Conference Proceedings (OSTI)

Load shapes, representing usage patterns in the electric and gas industry, are a key factor in energy company operations and management. In the emerging restructured energy market, retail energy suppliers market energy to final customers and must arrange for electricity generation or gas delivery to meet their customers' needs. EPRI and Primen sponsored a workshop in September 2000 that addressed a range of issues associated with load shapes, including modeling, profiling for retail market settlement, re...

2000-12-20T23:59:59.000Z

298

Space cooling demands from office plug loads  

Science Conference Proceedings (OSTI)

Undersizing space cooling systems for office buildings can result in uncomfortable and angry tenants on peak cooling days. However, oversizing wastes money because more capacity is installed than is needed, and oversized systems have a lower energy efficiency which makes operating costs higher than necessary. Oversizing can adversely affect comfort as well, because oversized systems may provide poor humidity control and large temperature variations. Correct system sizing requires estimating building heat loads accurately. This paper discusses the heat load generated by the plug load, which includes any electrical equipment that is plugged into outlets.

Komor, P.

1997-12-01T23:59:59.000Z

299

Optimal Placement and Sizing of Distributed Generator Units using Genetic Optimization  

E-Print Network (OSTI)

and electricity in the distribution grid. A group of DG units can form a virtual power plant, being centrally of distributed generation units in a residential distri- bution grid. Power losses are minimized while grid topology with pro- duction and residential load data based on measurements. Different scenarios

300

Definition: Base Load | Open Energy Information  

Open Energy Info (EERE)

Load Load Jump to: navigation, search Dictionary.png Base Load The minimum amount of electric power delivered or required over a given period at a constant rate.[1] View on Wikipedia Wikipedia Definition Baseload (also base load, or baseload demand) is the minimum amount of power that a utility or distribution company must make available to its customers, or the amount of power required to meet minimum demands based on reasonable expectations of customer requirements. Baseload values typically vary from hour to hour in most commercial and industrial areas. Related Terms electricity generation, power, smart grid References ↑ Glossary of Terms Used in Reliability Standards An in Like Like You like this.Sign Up to see what your friends like. line Glossary Definition Retrieved from

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Definition: Native Load | Open Energy Information  

Open Energy Info (EERE)

Terms Load-Serving Entity References Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline...

302

Passive load control for large wind turbines.  

DOE Green Energy (OSTI)

Wind energy research activities at Sandia National Laboratories focus on developing large rotors that are lighter and more cost-effective than those designed with current technologies. Because gravity scales as the cube of the blade length, gravity loads become a constraining design factor for very large blades. Efforts to passively reduce turbulent loading has shown significant potential to reduce blade weight and capture more energy. Research in passive load reduction for wind turbines began at Sandia in the late 1990's and has moved from analytical studies to blade applications. This paper discusses the test results of two Sandia prototype research blades that incorporate load reduction techniques. The TX-100 is a 9-m long blade that induces bend-twist coupling with the use of off-axis carbon in the skin. The STAR blade is a 27-m long blade that induces bend-twist coupling by sweeping the blade in a geometric fashion.

Ashwill, Thomas D.

2010-05-01T23:59:59.000Z

303

Modeling and control of thermostatically controlled loads  

SciTech Connect

As the penetration of intermittent energy sources grows substantially, loads will be required to play an increasingly important role in compensating the fast time-scale fluctuations in generated power. Recent numerical modeling of thermostatically controlled loads (TCLs) has demonstrated that such load following is feasible, but analytical models that satisfactorily quantify the aggregate power consumption of a group of TCLs are desired to enable controller design. We develop such a model for the aggregate power response of a homogeneous population of TCLs to uniform variation of all TCL setpoints. A linearized model of the response is derived, and a linear quadratic regulator (LQR) has been designed. Using the TCL setpoint as the control input, the LQR enables aggregate power to track reference signals that exhibit step, ramp and sinusoidal variations. Although much of the work assumes a homogeneous population of TCLs with deterministic dynamics, we also propose a method for probing the dynamics of systems where load characteristics are not well known.

Backhaus, Scott N [Los Alamos National Laboratory; Sinitsyn, Nikolai [Los Alamos National Laboratory; Kundu, S. [UNIV OF MICHIGAN; Hiskens, I. [UNIV OF MICHIGAN

2011-01-04T23:59:59.000Z

304

Impact of load type on microgrid stability  

E-Print Network (OSTI)

Microgrids show great promise as a means of integrating distributed generation sources into the public grid distribution system. In order to provide uninterrupted,high quality power to local loads, microgrids must have the ...

Monnin, Jared P

2012-01-01T23:59:59.000Z

305

High density load bearing insulation peg  

DOE Patents (OSTI)

A high density peg is disclosed which can support a large load and exhibits excellent thermal resistance produced by a method wherein the peg is made in compliance with specified conditions of time, temperature and pressure. 4 figs.

Nowobilski, J.J.; Owens, W.J.

1985-01-29T23:59:59.000Z

306

S-Band Loads for SLAC Linac  

SciTech Connect

The S-Band loads on the current SLAC linac RF system were designed, in some cases, 40+ years ago to terminate 2-3 MW peak power into a thin layer of coated Kanthal material as the high power absorber [1]. The technology of the load design was based on a flame-sprayed Kanthal wire method onto a base material. During SLAC linac upgrades, the 24 MW peak klystrons were replaced by 5045 klystrons with 65+ MW peak output power. Additionally, SLED cavities were introduced and as a result, the peak power in the current RF setup has increased up to 240 MW peak. The problem of reliable RF peak power termination and RF load lifetime required a careful study and adequate solution. Results of our studies and three designs of S-Band RF load for the present SLAC RF linac system is discussed. These designs are based on the use of low conductivity materials.

Krasnykh, A.; Decker, F.-J.; /SLAC; LeClair, R.; /INTA Technologies, Santa Clara

2012-08-28T23:59:59.000Z

307

High density load bearing insulation peg  

DOE Patents (OSTI)

A high density peg which can support a large load and exhibits excellent thermal resistance produced by a method wherein the peg is made in compliance with specified conditions of time, temperature and pressure.

Nowobilski, Jeffert J. (Orchard Park, NY); Owens, William J. (Kenmore, NY)

1985-01-01T23:59:59.000Z

308

Peak Load Shifting by Thermal Energy Storage  

Science Conference Proceedings (OSTI)

This technical update from the Electric Power Research Institute (EPRI) reviews the technology of storing energy in hot water and explores the potential for implementing this form of thermal energy storagethrough means of smart electric water heatersas a way to shift peak load on the electric grid. The report presents conceptual background, discusses strategies for peak load shifting and demand response, documents a series of laboratory tests conducted on a representative model of smart water heater, and...

2011-12-14T23:59:59.000Z

309

Gearbox Reliability Collaborative (GRC) Description and Loading  

SciTech Connect

This document describes simulated turbine load cases in accordance to the IEC 61400-1 Ed.3 standard, which is representative of the typical wind turbine design process. The information presented herein is intended to provide a broad understanding of the gearbox reliability collaborative 750kW drivetrain and turbine configuration. In addition, fatigue and ultimate strength drivetrain loads resulting from simulations are presented. This information provides the bases for the analytical work of the gearbox reliability collaborative effort.

Oyague, F.

2011-11-01T23:59:59.000Z

310

Unit Operational Flexibility: Low-Load Turndown of a Large Supercritical Boiler  

Science Conference Proceedings (OSTI)

Power plants must be able to match their output with system demand, which varies with the season and, more important, with the time of the day. Additionally, the variable nature of many renewable generation assets places flexibility pressure on traditional generation.BackgroundEPRI has a history of investigating off-design operation of power plants dating back more than 30 years. The issues surrounding variable pressure operation (VPO) are well understood; ...

2013-12-20T23:59:59.000Z

311

UPDATE: EFFECTIVE LOAD CARRYING CAPABILITY OF PHOTOVOLTAICS IN THE UNITED STATES  

E-Print Network (OSTI)

a higher resolution and more accurate satellite model to simulate site/time specific PV output with the same reliability by adding 100 MW PV, provided the ELCC of the 100 MW PV is 50 MW, or in relative terms, the ELCC can be significant because PV generation may be reliably available at critical demand times (e

Perez, Richard R.

312

Second United Nations  

NLE Websites -- All DOE Office Websites (Extended Search)

Nations Nations . DISCLAIMER This report was prepared a s an account of work sponsored by an agency of the United States Government. Neither t h e United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and

313

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

.2/06 WED 17:02 FAX 423 241 3897 OIG .2/06 WED 17:02 FAX 423 241 3897 OIG -** HQ . 001 United States Government Department of Energy Department of Energy memorandum DATE: February 9, 2006 Audit Report Number: OAS-L-06-07 REPLY TO ATTN OF; IG-32 (A050R014) SUBJECT: Audit of "The Department's Management of United States Enrichment Corporation Site Services" TO: Manager, Portsmouth/Paducah Project Office INTRODUCTTON AND OBJECTIVE The Paducah Gaseous Diffusion Plant (Paducah), located in western Kentucky, was constructed by the Department of Energy (Department) in the early 1950s to enrich uranium for use in various military and commercial applications. The Department operated the plant until the Energy Policy Act of 1992 created the United States Enrichment Corporation (USEC) as a Government-owned

314

Load apparatus and method for bolt-loaded compact tension test specimen  

DOE Patents (OSTI)

A bolt-loaded compact tension test specimen load apparatus includes: a) a body having first and second opposing longitudinal ends, the first end comprising an externally threaded portion sized to be threadedly received within the test specimen threaded opening; b) a longitudinal loading rod having first and second opposing longitudinal ends, the loading rod being slidably received in a longitudinal direction within the body internally through the externally threaded portion and slidably extending longitudinally outward of the body first longitudinal end; c) a force sensitive transducer slidably received within the body and positioned to engage relative to the loading rod second longitudinal end; and d) a loading bolt threadedly received relative to the body, the loading bolt having a bearing end surface and being positioned to bear against the transducer to forcibly sandwich the transducer between the loading bolt and loading rod. Also disclosed is a method of in situ determining applied force during crack propagation in a bolt-loaded compact tension test specimen.

Buescher, Jr., Brent J. (Idaho Falls, ID); Lloyd, W. Randolph (Idaho Falls, ID); Ward, Michael B. (Idaho Falls, ID); Epstein, Jonathan S. (Idaho Falls, ID)

1997-01-01T23:59:59.000Z

315

C. Uniform Unit Pricing Regulation  

Science Conference Proceedings (OSTI)

... to permit retail stores that voluntarily provide unit pricing to present prices using various ... with requirements that specify that the unit price is to be ...

2013-10-25T23:59:59.000Z

316

United Biofuels | Open Energy Information  

Open Energy Info (EERE)

United Biofuels Jump to: navigation, search Name United Biofuels Place York, Pennsylvania Product Waste and animal fats to biofuel producer, switched to animal fats from soy in...

317

Exemplary Units Markup Language usage  

Science Conference Proceedings (OSTI)

Sample UnitsML tools and usage. ... Its usage is limited to demonstrating capabilities of plain XSLT processing with the data stored in UnitsML. ...

318

Real power regulation for the utility power grid via responsive loads  

DOE Patents (OSTI)

A system for dynamically managing an electrical power system that determines measures of performance and control criteria for the electric power system, collects at least one automatic generation control (AGC) input parameter to at least one AGC module and at least one automatic load control (ALC) input parameter to at least one ALC module, calculates AGC control signals and loads as resources (LAR) control signals in response to said measures of performance and control criteria, propagates AGC control signals to power generating units in response to control logic in AGC modules, and propagates LAR control signals to at least one LAR in response to control logic in ALC modules.

McIntyre, Timothy J. (Knoxville, TN); Kirby, Brendan J. (Knoxville, TN); Kisner, Roger A. (Knoxville, TN), Van Dyke, James W. (Knoxville, TN)

2009-05-19T23:59:59.000Z

319

United States lubricant demand  

Science Conference Proceedings (OSTI)

This paper examines United States Lubricant Demand for Automotive and Industrial Lubricants by year from 1978 to 1992 and 1997. Projected total United States Lubricant Demand for 1988 is 2,725 million (or MM) gallons. Automotive oils are expected to account for 1,469MM gallons or (53.9%), greases 59MM gallons (or 2.2%), and Industrial oils will account for the remaining 1,197MM gallons (or 43.9%) in 1988. This proportional relationship between Automotive and Industrial is projected to remain relatively constant until 1992 and out to 1997. Projections for individual years between 1978 to 1992 and 1997 are summarized.

Solomon, L.K.; Pruitt, P.R.

1988-01-01T23:59:59.000Z

320

Base load fuel comsumption with radiant boiler simulation  

Science Conference Proceedings (OSTI)

The operating point of an oil fired radiant boiler, 580 Megawatt capacity, is critical in maximizing the availability, performance, reliability, and maintainability of a power producing system. Operating the unit above the design operating point causes outages to occur sooner than scheduled. When the boiler is operated below the design operating point, fuel is wasted because the quantity of fuel required to operate a radiant boiler is the same, whether the design setpoint is maintained or not. This paper demonstrates by means of simulation software that the boiler design setpoints is critical to fuel consumption and optimum output megawatts. A boiler with this capacity is used to provide a portion of the base load of an electric utility in order to sustain revenues and maintain reliable generation.

Shwehdi, M.H. (Pennsylvania State Univ., Wilkes-Barre, Lehman, PA (United States)); Hughes, C.M. (Naval Aviation Depot, NAS Jacksonville, Jacksonville, FL (United States)); Quasem, M.A. (Howard Univ. School of Business, Washington, DC (United States))

1992-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Review: Stability of nonlinear masonry members under combined load  

Science Conference Proceedings (OSTI)

Under examination is the post buckling of unreinforced load-bearing masonry walls or piers subject to a combined load consisting of a uniformly distributed axial load and a concentrated eccentric load at the top end. Fixed free-ended prismatic columns ... Keywords: Brick walls, Combined load, Instability, Masonry, No-tension material, Nonlinear constitutive law

Igino Mura

2008-08-01T23:59:59.000Z

322

Supply Fan Control for Constant Air Volume Air Handling Units  

E-Print Network (OSTI)

Since terminal boxes do not have a modulation damper in constant volume (CV) air handling unit (AHU) systems, zone reheat coils have to be modulated to maintain the space temperature with constant supply airflow. This conventional control sequence causes a significant amount of reheat and constant fan power under partial load conditions. Variable Frequency Drives (VFDs) can be installed on these constant air volume systems. The fan speed can be modulated based on the maximum zone load. This paper present the procedure to control the supply fan speed and analyzes the thermal performance and major fan energy and thermal energy savings without expensive VAV retrofit through the actual system operation.

Cho, Y.; Wang, G.; Liu, M.

2007-01-01T23:59:59.000Z

323

Solving Unit Commitment by a Unit Decommitment Method  

E-Print Network (OSTI)

demand, and operating constraints such as spinning reserve requirements, over a short time horizon of power unit i is generating in time period t pmin i pmax i : minimum maximum rated capacity of unit i rmax i : maximum reserve for unit i ripit : reserve available from unit i in time period t minrmax i

324

Conditional model of peak and minimum loads and the load duration curve for electricity  

SciTech Connect

This report presents a model that extends the traditional model of electricity demand to account for intra-period load variation, the kind of variation that is important for evaluating marginal-cost-reflecting price structures. The time-of-day rate is one such price structure. The traditional model of electricity demand explains inter-period demand variation. It says nothing about load variation. The report explains how a model that integrates with previous studies of electricity demand might be formulated. It specifies two concrete models within this framework and estimates them for a number of different utility companies. The model's within-sample-period performance in predicting peak loads is presented for one version of the model extension along with estimations for other variations. In addition a number of plots of actual load distributions, a summation of load variation information, against the actual load distributions, are presented and used to evaluate the performance of specific models.

Trimble, J.L.; Stallings, D.E.; Thomas, B.

1980-05-01T23:59:59.000Z

325

Tests with a line-commutated converter as a variable inductive load on the Bonneville Power Administration transmission system  

DOE Green Energy (OSTI)

A twelve-pulse, line-commutated converter, with a steady-state rating of 2.5 kV and 5.5 kA, formerly used for charging and discharging a superconducting magnet, was reconfigured as a static reactive power load. Tests staged at the Tacoma, WA, substation of the Bonneville Power Administration (BPA) revealed that the converter could be used as a variable inductive load, provided a stable current controller was installed. The unit was modulated as a variable VAR load following a sinusoidal VAR demand signal with an amplitude up to 14.8 MVAR. The total losses at maximum VAR output were 370 kW. This paper explains the necessary modifications of the converter to operate as a variable reactive load. Measured current waveshapes are analyzed. The effects of such a load on the BPA transmission system are presented.

Boenig, H.J.; Hauer, J.F.; Nielsen, R.G.

1986-01-01T23:59:59.000Z

326

COOPERATIVE RESEARCH UNITS2009  

E-Print Network (OSTI)

. The CRU program expects to continue to work with cooperators in identify- ing high priority hiring actions Cooperators' Coalition (NCC) for the CRU program, which targets efforts in CRU to (i) find new ways to workCOOPERATIVE RESEARCH UNITS2009 Year In Review PROGRAM YEAR IN REVIEW In Fiscal Year (FY) 2009

327

Static load test of Arquin-designed CMU wall.  

Science Conference Proceedings (OSTI)

The Arquin Corporation has developed a new method of constructing CMU (concrete masonry unit) walls. This new method uses polymer spacers connected to steel wires that serve as reinforcing as well as means of accurately placing the spacers so that the concrete block can be dry stacked. The hollows of the concrete block used in constructing the wall are then filled with grout. As part of a New Mexico Small Business Assistance Program (NMSBAP), Sandia National Laboratories conducted a series of tests that statically loaded wall segments to compare the Arquin method to a more traditional method of constructing CMU walls. A total of 12 tests were conducted, three with the Arquin method using a W5 reinforcing wire, three with the traditional method of construction using a number 3 rebar as reinforcing, three with the Arquin method using a W2 reinforcing wire, and three with the traditional construction method but without rebar. The results of the tests showed that the walls constructed with the Arquin method and with a W5 reinforcing wire withstood more load than any of the other three types of walls that were tested.

Jensen, Richard Pearson; Cherry, Jeffery L.

2008-12-01T23:59:59.000Z

328

Dynamic load test of Arquin-designed CMU wall.  

SciTech Connect

The Arquin Corporation has developed a new method of constructing CMU (concrete masonry unit) walls. This new method uses polymer spacers connected to steel wires that serve as reinforcing as well as a means of accurately placing the spacers so that the concrete block can be dry stacked. The hollows of the concrete block are then filled with grout. As part of a New Mexico Small Business Assistance Program (NMSBA), Sandia National Laboratories conducted a series of tests that dynamically loaded wall segments to compare the performance of walls constructed using the Arquin method to a more traditional method of constructing CMU walls. A total of four walls were built, two with traditional methods and two with the Arquin method. Two of the walls, one traditional and one Arquin, had every third cell filled with grout. The remaining two walls, one traditional and one Arquin, had every cell filled with grout. The walls were dynamically loaded with explosive forces. No significant difference was noted between the performance of the walls constructed by the Arquin method when compared to the walls constructed by the traditional method.

Jensen, Richard Pearson

2010-02-01T23:59:59.000Z

329

Harmonic approaches to non-intrusive load diagnostics  

E-Print Network (OSTI)

The Non-Intrusive Load Monitor (NILM) is a system that monitors, records and processes voltage and current measurements to establish the operating characteristics of individual loads on a load center from a single aggregate ...

Fuller, Ashley E. (Ashley Eliot)

2008-01-01T23:59:59.000Z

330

IMPROVEMENTS TO THE RADIANT TIME SERIES METHOD COOLING LOAD CALCULATION  

E-Print Network (OSTI)

IMPROVEMENTS TO THE RADIANT TIME SERIES METHOD COOLING LOAD CALCULATION PROCEDURE By BEREKET TO THE RADIANT TIME SERIES METHOD COOLING LOAD CALCULATION PROCEDURE Dissertation Approved: Dr. Jeffrey D- Original RTSM.......................................................153 4.4.1 RTSM Peak Design Cooling Load

331

Building Energy Software Tools Directory: HVAC Residential Load...  

NLE Websites -- All DOE Office Websites (Extended Search)

HVAC Residential Load Calcs HD for the iPad Carmel Software logo HVAC Residential Load Calcs HD is a comprehensive HVAC heating and cooling load calculation application for the...

332

Direct versus Facility Centric Load Control for Automated Demand Response  

E-Print Network (OSTI)

actions to influence load profiles of their customers atISO needs to influence the load profile of a Facility arebe a specific target load profile to be achieved while in

Piette, Mary Ann

2010-01-01T23:59:59.000Z

333

Property Models for High Waste Loaded Hanford HLW Glasses  

High Waste Loading Was Shown for Selected Wastes Examples of the high loaded glasses Al 2O 3 loadings in the 24-26 wt% range compared to <15% for a

334

How and why distribution loads vary  

SciTech Connect

Because the maximum-use rates of gas customers having differing appliance combinations do not coincide, a distribution system's peak-hour flow rate depends on the relative proportions of the load contributed by the appliances of all the different types of residential, commercial, and industrial customers. The maximum load on Central Hudson's distribution system coincides with the maximum hourly gas flow rate for all residential space-heating purposes; however, Central Hudson analyzes the peak-hour load of its commercial and industrial customers individually. The gas-system sendout presented as a sendout-duration curve is a convenient way to show how these various loads determine gas requirements and to compare the economics of alternative supply methods. The sendout-duration curve consists of long-term weather data plotted against time intervals of 1-365 days. If the threshold temperature and the heating load per degree-day are known, the curve allows the calculation of both normal and design annual peakshaving quantities.

Haber, D.P.

1980-01-01T23:59:59.000Z

335

Status of load management storage demonstrations  

DOE Green Energy (OSTI)

DOE is funding a nationwide demonstration of electric load management through the use of utility-controlled, customer-side thermal energy storage for residential space conditioning. The general concept of the projects was developed with the assistance of a broadly based working group drawn from the utility industry. This paper presents the current status of these demonstrations. Ten demonstrations are underway - five heat storage and five cool storage - using between 30 and 50 near-commercial thermal storage devices. The installations and experimental program are designed to: (1) collect reliable load research data for assessing the impact on the utility system; (2) delineate and solve installation problems; (3) establish maintainability; (4) illuminate customer and utility acceptance; and (5) generate cost data. The results obtained are expected to assist utilities in making local load-management decisions, to assist DOE in establishing priorities for R and D efforts in load management, and to provide objective information related to the electric system impact, energy conservation, and cost-effectiveness of this form of load management.

Long, H M; Mohre, D L

1979-01-01T23:59:59.000Z

336

A practical approach for electricity load forecasting  

E-Print Network (OSTI)

Abstract—This paper is a continuation of our daily energy peak load forecasting approach using our modified network which is part of the recurrent networks family and is called feed forward and feed back multi context artificial neural network (FFFB-MCANN). The inputs to the network were exogenous variables such as the previous and current change in the weather components, the previous and current status of the day and endogenous variables such as the past change in the loads. Endogenous variable such as the current change in the loads were used on the network output. Experiment shows that using endogenous and exogenous variables as inputs to the FFFB-MCANN rather than either exogenous or endogenous variables as inputs to the same network produces better results. Experiments show that using the change in variables such as weather components and the change in the past load as inputs to the FFFB-MCANN rather than the absolute values for the weather components and past load as inputs to the same network has a dramatic impact and produce better accuracy.

T. Rashid; T. Kechadi

2005-01-01T23:59:59.000Z

337

United Nations Industrial Development Organization (UNIDO) | Open Energy  

Open Energy Info (EERE)

United Nations Industrial Development Organization (UNIDO) United Nations Industrial Development Organization (UNIDO) Jump to: navigation, search Logo: United Nations Industrial Development Organization Name United Nations Industrial Development Organization Address Wagramer Straße 5, 1220 Place Vienna, Austria Phone number +43 (1) 26026-0 Coordinates 48.2336891°, 16.4174512° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.2336891,"lon":16.4174512,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

338

Load cell having strain gauges of arbitrary location  

DOE Patents (OSTI)

A load cell utilizes a plurality of strain gauges mounted upon the load cell body such that there are six independent load-strain relations. Load is determined by applying the inverse of a load-strain sensitivity matrix to a measured strain vector. The sensitivity matrix is determined by performing a multivariate regression technique on a set of known loads correlated to the resulting strains. Temperature compensation is achieved by configuring the strain gauges as co-located orthogonal pairs.

Spletzer, Barry (Albuquerque, NM)

2007-03-13T23:59:59.000Z

339

SC: Install units produced by the high performance RTU challenge | The  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Solutions Teams » Space Conditioning » Install units Technology Solutions Teams » Space Conditioning » Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification Activities Technology Solutions Teams Lighting & Electrical Space Conditioning Plug & Process Loads Food Service Refrigeration Laboratories Energy Management & Information Systems Public Sector Teams Market Solutions Teams Install units produced by the High Performance Rooftop Unit Challenge that meet the high performance rooftop unit specification In January 2011, the U.S. Department of Energy (DOE) joined industry partners in the Better Buildings Alliance to release a design specification for 10-ton capacity commercial air conditioners, also known as rooftop units (RTUs).

340

A comparison of measured wind park load histories with the WISPER and WISPERX load spectra  

DOE Green Energy (OSTI)

The blade-loading histories from two adjacent Micon 65/13 wind turbines are compared with the variable-amplitude test-loading histories known as the WISPER and WISPERX spectra. These standardized loading sequences were developed from blade flapwise load histories taken from nine different horizontal-axis wind turbines operating under a wide range of conditions in Europe. The subject turbines covered a broad spectrum of rotor diameters, materials, and operating environments. The final loading sequences were developed as a joint effort of thirteen different European organizations. The goal was to develop a meaningful loading standard for horizontal-axis wind turbine blades that represents common interaction effects seen in service. In 1990, NREL made extensive load measurements on two adjacent Micon 65/13 wind turbines in simultaneous operation in the very turbulent environment of a large wind park. Further, before and during the collection of the loads data, comprehensive measurements of the statistics of the turbulent environment were obtained at both the turbines under test and at two other locations within the park. The trend to larger but lighter wind turbine structures has made an understanding of the expected lifetime loading history of paramount importance. Experience in the US has shown that the turbulence-induced loads associated with multi-row wind parks in general are much more severe than for turbines operating individually or within widely spaced environments. Multi-row wind parks are much more common in the US than in Europe. In this paper we report on our results in applying the methodology utilized to develop the WISPER and WISPERX standardized loading sequences using the available data from the Micon turbines. While the intended purpose of the WISPER sequences were not to represent a specific operating environment, we believe the exercise is useful, especially when a turbine design is likely to be installed in a multi-row wind park.

Kelley, N.D.

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Permanent Peak Load Shift Product Deployment for Smart Grid Integration and Operation  

Science Conference Proceedings (OSTI)

This project tested and evaluated an innovative energy storage technology that provides permanent peak load shifting using electro-thermal energy storage in combination with commercial unitary rooftop air conditioning systems. Four Ice Bear 30 units were deployed at a Staples facility to store an estimated 32 kWh each of energy in 10 off-peak hours and reduce an estimated 5 kW of site energy demand for an on-peak six-hour period. The Ice Bear units are monitored and controlled with a smart grid ...

2012-11-14T23:59:59.000Z

342

Essentials of the SI: Base & derived units  

Science Conference Proceedings (OSTI)

... Table 1. SI base units. SI base unit. Base quantity, Name, Symbol. length, meter, m. ... Table 2. Examples of SI derived units. SI derived unit. ...

343

Load attenuating passively adaptive wind turbine blade  

DOE Patents (OSTI)

A method and apparatus for improving wind turbine performance by alleviating loads and controlling the rotor. The invention employs the use of a passively adaptive blade that senses the wind velocity or rotational speed, and accordingly modifies its aerodynamic configuration. The invention exploits the load mitigation prospects of a blade that twists toward feather as it bends. The invention includes passively adaptive wind turbine rotors or blades with currently preferred power control features. The apparatus is a composite fiber horizontal axis wind-turbine blade, in which a substantial majority of fibers in the blade skin are inclined at angles of between 15 and 30 degrees to the axis of the blade, to produces passive adaptive aeroelastic tailoring (bend-twist coupling) to alleviate loading without unduly jeopardizing performance.

Veers, Paul S. (Albuquerque, NM); Lobitz, Donald W. (Albuquerque, NM)

2003-01-01T23:59:59.000Z

344

On loading rate effects in toughening processes  

SciTech Connect

Environmental crack tip reactions are a known source of premature fracture in oxides. These rate-dependent phenomena commonly are studied in strength tests where loading rate serves as the major experimental variable. A material susceptible to environmentally-assisted crack growth is stronger at fast testing rates. A topic which has received far less attention is the influence of stressing rate or loading rate on the shielding processes which occur at some distance from the crack tip, although the inverse has been studied by Deuerler et al. The authors present here the first known documentation of a loading rate effect on shielding phenomena in ceramic materials. For these experiments Coors AD 94 alumina was chosen for study.

Tandon, S.; Faber, K.T. [Northwestern Univ., Evanston, IL (United States)

1996-03-01T23:59:59.000Z

345

Definition: Direct Control Load Management | Open Energy Information  

Open Energy Info (EERE)

Control Load Management Jump to: navigation, search Dictionary.png Direct Control Load Management Demand-Side Management that is under the direct control of the system operator....

346

Definition: Circuit Peak Load Management | Open Energy Information  

Open Energy Info (EERE)

Circuit Peak Load Management Jump to: navigation, search Dictionary.png Circuit Peak Load Management An application utilizing sensors, information processors, communications, and...

347

The Effect of Daylighting Strategies on Building Cooling Loads...  

NLE Websites -- All DOE Office Websites (Extended Search)

The Effect of Daylighting Strategies on Building Cooling Loads and Overall Energy Performance Title The Effect of Daylighting Strategies on Building Cooling Loads and Overall...

348

Repository Reference Disposal Concepts and Thermal Load Management...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repository Reference Disposal Concepts and Thermal Load Management Analysis Repository Reference Disposal Concepts and Thermal Load Management Analysis A disposal concept consists...

349

Definition: Dispersed Load By Substations | Open Energy Information  

Open Energy Info (EERE)

By Substations Jump to: navigation, search Dictionary.png Dispersed Load By Substations Substation load information configured to represent a system for power flow or system...

350

Methods and apparatus for reduction of asymmetric rotor loads in ...  

A method for reducing load and providing yaw alignment in a wind turbine includes measuring displacements or moments resulting from asymmetric loads on the wind turbine.

351

Comparison of Building Energy Modeling Programs: Building Loads  

NLE Websites -- All DOE Office Websites (Extended Search)

Comparison of Building Energy Modeling Programs: Building Loads Title Comparison of Building Energy Modeling Programs: Building Loads Publication Type Report LBNL Report Number...

352

Definition: Real-Time Load Transfer | Open Energy Information  

Open Energy Info (EERE)

Real-time load transfer is achieved through real-time feeder reconfiguration and optimization to relieve load on equipment, improve asset utilization, improve distribution...

353

Load Control for System Reliability and Measurement-Based Stability...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Load Control for System Reliability and Measurement-Based Stability Assessment Load Control for System Reliability and Measurement-Based Stability Assessment Research and develop...

354

Building Energy Software Tools Directory: Prophet Load Profiler  

NLE Websites -- All DOE Office Websites (Extended Search)

Shots Keywords energy analysis, load profiling, cost comparison, energy budgeting, rate analysis, data collection, real-time monitoring, load shedding ValidationTesting NA...

355

Energetical factors in power systems with nonlinear loads  

Science Conference Proceedings (OSTI)

Based on the volt-ampere charac- teristic of the nonlinear load, an equivalent circuit, containing linear elements, can be determined. In this way, load-flow and.

356

Used Nuclear Fuel Loading and Structural Performance Under Normal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan Used Nuclear Fuel Loading...

357

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

uv /uu/u* ±.u.. J.OJ..L rAA , *. . uv /uu/u* ±.u.. J.OJ..L rAA , *. . 'A4 .. ± OO, I U444 flmI I.j102 ' -f- $I)002 EP<.1 (o-.vu) United States Government Department of Energy memorandum DATE: January 30, 2004 REP.YTO: IG-35 (A03DN039) Audit Report No.: OAS-L-04-10 SUBJECT: Audit of the Safeguards and Security Program at the Rocky Flats Environmental Technology Site To: Frazer Lockhart, Manager, Rocky Flats Field Office INTRODUCTION AND OBJECTIVE Because of the terrorist attacks against the United States on September 11, 2001, the Department of Energy (Department) instituted additional security requirements beyond those already in place for normal security operations. These "Security Conditions" requirements were established by Department Notice 473.8 (Notice). The requirements are based on

358

l UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

UNITED STATES GOVERNMENT UNITED STATES GOVERNMENT lb 15 SUBJECT: THORFJM PROCURENENT PMF'N:TBU Jesse C. Johnson, Gtnager of IRaw Materials Operations3s.Office 3 R. W. Cook, Director of Production ~',LL:::+ I--- DATE: MAR ! 9 1951 The following list of suppliers of thorium and the amounts of materials procured from them by the Mew York Operations Office during calendar year 1950 is being supplied in accordance with Mr. Spelmanls telephone request of March 19. Thorium Lannett Bleachery iinde Air Products Co. Lindsey Light & Chemical Co. lliscellaneous NY0 Liscensing Division Rare Earths, Inc. Wolff-Alport Total - (kilograms) 179 38,2;2 -3 4,210 /vyeoi 4 -q- 2 : i ' \ iti 1 i 0 ;;\I:' --' I F 10 i;;;?/ \ --' L & ;:I :,- :,j( EZi 5 1 :' -I I ri _ I ' R i; .- . )- .i

359

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ng ng United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: APR 18 2003 REPLY TO ATTN OF: IG-34 (A02PR010) Audit Report No.: OAS-L-03-15 SUBJECT: Audit of the Weatherization Assistance Program TO: Director, Weatherization and Intergovernmental Program, EE-2K The purpose of this report is to inform you of the results of our audit of the Weatherization Assistance Program. INTRODUCTION AND OBJECTIVE The Weatherization Assistance Program (Program) was established to increase energy efficiency in dwellings owned or occupied by low-income persons to reduce their residential energy expenditures and improve their health and safety. Since its inception in 1976, the Program has reported that approximately 5 million dwelling units owned or occupied by low-income individuals have been weatherized.

360

United States Government Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE r 1325.0 OE r 1325.0 (01.93) United States Government Department of memorandum DATE: March 23, 2006 Audit Report Number: OAS-L-06-09 REPLY TO ATTN OF: IG-32 (A060R040) SUBJECT: Audit of"The Department of Energy's Management of the Northeast Home Heating Oil Reserve" TO, Deputy Assistant Secrctary for Petroleum Reserves INTRODUCTION AND OBJECTIVE The Energy Act of 2000 authorized the Secretary of Energy to create a Northeast Home Heating Oil Reserve (Reserve). The Reserve was established as an "emergency buffer" to supplement commercial supplies should a severe supply disruption occur in the heavily heating oil-dependent northeast United States. The Reserve consists of 2 million barrels of emergency home heating oil, enough to provide Northeast consumers adequate supplies for approximately

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

United States Government United States Government Department of Energy Memorandum DATE: July 29, 2005 REPLY TO ATTN TO: IG-34 (A05HQ002) Audit Report No. OAS-L-05-10 SUBJECT: Agreed-Upon Procedures for Federal Payroll TO: Director, Office of Management, Budget, and Evaluation/Chief Financial Officer, ME-1 INTRODUCTION AND OBJECTIVE The Office of Management and Budget (OMB) Bulletin No. 01-02, "Audit Requirements for Federal Financial Statement," dated October 16, 2000, requires an annual audit of civilian payroll of executive departments and other Government agencies. Auditors are required to follow the agreed-upon procedures in Appendix I-1 of OMB Bulletin No. 01-02, to assess the reasonableness of life insurance, health benefits, and retirement withholdings and contributions.

362

Thermal insulated glazing unit  

SciTech Connect

An improved insulated glazing unit is provided which can attain about R5 to about R10 thermal performance at the center of the glass while having dimensions about the same as those of a conventional double glazed insulated glazing unit. An outer glazing and inner glazing are sealed to a spacer to form a gas impermeable space. One or more rigid, non-structural glazings are attached to the inside of the spacer to divide the space between the inner and outer glazings to provide insulating gaps between glazings of from about 0.20 inches to about 0.40 inches. One or more glazing surfaces facing each thermal gap are coated with a low emissivity coating. Finally, the thermal gaps are filled with a low conductance gas such as krypton gas.

Selkowitz, Stephen E. (Piedmont, CA); Arasteh, Dariush K. (Oakland, CA); Hartmann, John L. (Seattle, WA)

1991-01-01T23:59:59.000Z

363

Thermal insulated glazing unit  

DOE Patents (OSTI)

An improved insulated glazing unit is provided which can attain about R5 to about R10 thermal performance at the center of the glass while having dimensions about the same as those of a conventional double glazed insulated glazing unit. An outer glazing and inner glazing are sealed to a spacer to form a gas impermeable space. One or more rigid, non-structural glazings are attached to the inside of the spacer to divide the space between the inner and outer glazings to provide insulating gaps between glazings of from about 0.20 inches to about 0.40 inches. One or more glazing surfaces facing each thermal gap are coated with a low emissivity coating. Finally, the thermal gaps are filled with a low conductance gas such as krypton gas. 2 figs.

Selkowitz, S.E.; Arasteh, D.K.; Hartmann, J.L.

1988-04-05T23:59:59.000Z

364

United States Environmental Monitoring  

Office of Legacy Management (LM)

EPA 60014-91/030 EPA 60014-91/030 Environmental Protection Systems Laboratory DOE/DP00539-063 Agency P.O. Box 93478 Las Vegas NV 891 93-3478 Research and Development Offsite Environmental Monitoring Report: 1 - 3 5 Radiation Monitorina Around * / (- P 7 1 United States ~ u c l g a r Test Areas Calendar Year 1990 This page intentionally left blank EPN60014-90 DOWDP Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 Contributors: D.J. Chaloud, B.B. Dicey, D.G. Easterly, C.A. Fontana, R.W. Holloway, A.A. Mullen, V.E. Niemann, W.G. Phillips, D.D. Smith, N.R. Sunderland, D.J. Thome, and Nuclear Radiation Assessment Division Prepared for: U.S. Department of Energy under Interagency Agreement Number DE-A108-86-NV10522

365

SYSPLAN. Load Leveling Battery System Costs  

SciTech Connect

SYSPLAN evaluates capital investment in customer side of the meter load leveling battery systems. Such systems reduce the customer`s monthly electrical demand charge by reducing the maximum power load supplied by the utility during the customer`s peak demand. System equipment consists of a large array of batteries, a current converter, and balance of plant equipment and facilities required to support the battery and converter system. The system is installed on the customer`s side of the meter and controlled and operated by the customer. Its economic feasibility depends largely on the customer`s load profile. Load shape requirements, utility rate structures, and battery equipment cost and performance data serve as bases for determining whether a load leveling battery system is economically feasible for a particular installation. Life-cycle costs for system hardware include all costs associated with the purchase, installation, and operation of battery, converter, and balance of plant facilities and equipment. The SYSPLAN spreadsheet software is specifically designed to evaluate these costs and the reduced demand charge benefits; it completes a 20 year period life cycle cost analysis based on the battery system description and cost data. A built-in sensitivity analysis routine is also included for key battery cost parameters. The life cycle cost analysis spreadsheet is augmented by a system sizing routine to help users identify load leveling system size requirements for their facilities. The optional XSIZE system sizing spreadsheet which is included can be used to identify a range of battery system sizes that might be economically attractive. XSIZE output consisting of system operating requirements can then be passed by the temporary file SIZE to the main SYSPLAN spreadsheet.

Hostick, C.J. [Pacific Northwest Lab., Richland, WA (United States)

1988-03-22T23:59:59.000Z

366

Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California  

E-Print Network (OSTI)

This  baseline  load  profile  (BLP)  is  key  to to  as  the  baseline  load  profile  or  BLP  and  is  key actual  and  estimated  load  profiles  look,  Figure  1 

Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote, Sila

2008-01-01T23:59:59.000Z

367

Laser system preset unit  

DOE Patents (OSTI)

An electronic circuit is provided which may be used to preset a digital display unit of a Zeeman-effect layer interferometer system which derives distance measurements by comparing a reference signal to a Doppler signal generated at the output of the interferometer laser head. The circuit presets dimensional offsets in the interferometer digital display by electronically inducing a variation in either the Doppler signal or the reference signal, depending upon the direction of the offset, to achieve the desired display preset.

Goodwin, William L. (Knoxville, TN)

1977-01-01T23:59:59.000Z

368

Fuel Assembly Shaker Test for Determining Loads on a PWR Assembly under  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assembly Shaker Test for Determining Loads on a PWR Assembly Assembly Shaker Test for Determining Loads on a PWR Assembly under Surrogate Normal Conditions of Truck Transport R0.1 Fuel Assembly Shaker Test for Determining Loads on a PWR Assembly under Surrogate Normal Conditions of Truck Transport R0.1 The United States current approach of long-term storage at its nuclear power plants and independent spent fuel storage installation, and deferred transportation of used nuclear fuel (UNF), along with the trend of nuclear power plants using reactor fuel for a longer time, creates questions concerning the ability of this aged, high-burnup fuel to withstand stresses and strains seen during normal conditions of transport from its current location to a future consolidated storage facility or permanent repository. UNFD R&D conducted testing employing surrogate instrumented

369

Finite element analysis of the Arquin-designed CMU wall under a dynamic (blast) load.  

Science Conference Proceedings (OSTI)

The Arquin Corporation designed a CMU (concrete masonry unit) wall construction and reinforcement technique that includes steel wire and polymer spacers that is intended to facilitate a faster and stronger wall construction. Since the construction method for an Arquin-designed wall is different from current wall construction practices, finite element computer analyses were performed to estimate the ability of the wall to withstand a hypothetical dynamic load, similar to that of a blast from a nearby explosion. The response of the Arquin wall was compared to the response of an idealized standard masonry wall exposed to the same dynamic load. Results from the simulations show that the Arquin wall deformed less than the idealized standard wall under such loading conditions. As part of a different effort, Sandia National Laboratories also looked at the relative static response of the Arquin wall, results that are summarized in a separate SAND Report.

Lopez, Carlos; Petti, Jason P.

2008-12-01T23:59:59.000Z

370

Matching equipment size to the cooling load  

SciTech Connect

This article presents a heat extraction rate analysis method, using ASHRAE algorithms that enables HVAC system designers to optimally size cooling equipment. The final stage of the cooling load calculation process determines the heat extraction rate required to achieve design conditions. Put another way, this stage determines the equipment capacity required to match the cooling load profile, and it does so in a manner that predicts the resulting space temperature profile, and it does so in a manner that predicts the resulting space temperature profile. It is a stage in the design process that, in practice, may not be given the attention it deserves.

Bloom, B. (Harvey Toub Engineering, Atlanta, GA (United States))

1993-10-01T23:59:59.000Z

371

LOADED WAVE GUIDES FOR LINEAR ACCELERATORS  

DOE Patents (OSTI)

A periodically loaded waveguide having substantially coaxially arranged elements which provide an axial field for the acceleration of electrons is described. Radiofrequency energy will flow in the space between the inner wall of an outer guide and the peripheries of equally spaced irises or washes arranged coaxially with each other and with the outer guide, where the loading due to the geometry of the irises is such as to reduce the phase velocity of the r-f energy flowing in the guide from a value greater than that of light to the velocity of light or less.

Walkinshaw, W.; Mullett, L.B.

1959-12-01T23:59:59.000Z

372

New method developed for LPG offshore loading  

SciTech Connect

An innovative concept for refrigerated LPG offshore loading has been developed by TOTAL and Enterprise D'Equipments Mecaniques at Hydrauliques. Known as CHAGAL, the system integrates with the catenary anchor leg mooring offshore loading system commonly used for crude oil. CHAGAL provides a suitable answer to short-term development schemes of LPG trade. It can be adapted for possible extrapolation to cryogenic temperatures of LNG and it opens a new way to the development of offshore liquefaction projects for which the offloading of production is still an unsolved key problem.

1985-10-01T23:59:59.000Z

373

United Arab Emirates: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

United Arab Emirates: Energy Resources United Arab Emirates: Energy Resources Jump to: navigation, search Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"390px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":24,"lon":54,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

374

Hoechst plans Mexican unit  

SciTech Connect

Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

Wood, A.; Alperowicz, N.

1996-05-22T23:59:59.000Z

375

Methods to Mitigate the Effect of Increased Cycling and Load Following on Heat Rate  

Science Conference Proceedings (OSTI)

Most of the U.S. coal-fired plants currently in service were designed for baseload operation. Today, however, actual generation conditions dictate that many of these units operate in a continuous transient mode, following generation demand. As such, they often experience large load changes throughout the day that result in a poorer plant heat rate. Reducing the throttle pressure, also known as sliding pressure, reduces throttling losses and is a potential method to reduce the heat rate penalties ...

2012-12-14T23:59:59.000Z

376

Mathematical structure of unit systems  

E-Print Network (OSTI)

We investigate the mathematical structure of unit systems and the relations between them. Looking over the entire set of unit systems, we can find a mathematical structure that is called preorder (or quasi-order). For some pair of unit systems, there exists a relation of preorder such that one unit system is transferable to the other unit system. The transfer (or conversion) is possible only when all of the quantities distinguishable in the latter system are always distinguishable in the former system. By utilizing this structure, we can systematically compare the representations in different unit systems. Especially, the equivalence class of unit systems (EUS) plays an important role because the representations of physical quantities and equations are of the same form in unit systems belonging to an EUS. The dimension of quantities is uniquely defined in each EUS. The EUS's form a partially ordered set. Using these mathematical structures, unit systems and EUS's are systematically classified and organized as a hierarchical tree.

Masao Kitano

2013-05-04T23:59:59.000Z

377

Load relaxation studies of a metallic glass  

SciTech Connect

Experimental results of load relaxation studies of a commercial metallic glass as a function of temperature are reported. The data suggest that metallic glasses exhibit deformation behavior with flow laws similar to those governing plastic deformation in crystalline solids. The lack of appreciable work hardening in annealed material and the identification of an anelastic component are also indicated by the experimental observations. (GHT)

Hadnagy, T.D.; Krenisky, D.J.; Ast, D.G.; Li, C.Y.

1977-01-01T23:59:59.000Z

378

Demand or Request: Will Load Behave?  

Science Conference Proceedings (OSTI)

Power planning engineers are trained to design an electric system that satisfies predicted electrical demand under stringent conditions of availability and power quality. Like responsible custodians, we plan for the provision of electrical sustenance and shelter to those in whose care regulators have given us the responsibility to serve. Though most customers accept this nurturing gladly, a growing number are concerned with the economic costs and environmental impacts of service at a time when technology (particularly distributed generation, storage, automation, and information networks) offers alternatives for localized control and competitive service. As customers’ and their systems mature, a new relationship with the electricity provider is emerging. Demand response is perhaps the first unsteady step where the customer participates as a partner in system operations. This paper explores issues system planners need to consider as demand response matures to significant levels beyond direct load control and toward a situation where service is requested and bargains are reached with the electricity provider based on desired load behavior. On one hand, predicting load growth and behavior appears more daunting than ever. On the other, for the first time load becomes a new resource whose behavior can be influenced during system operations to balance system conditions.

Widergren, Steven E.

2009-07-30T23:59:59.000Z

379

Incentivizing Advanced Load Scheduling in Smart Homes  

Science Conference Proceedings (OSTI)

In recent years, researchers have proposed numerous advanced load scheduling algorithms for smart homes with the goal of reducing the grid's peak power usage. In parallel, utilities have introduced variable rate pricing plans to incentivize residential ... Keywords: Battery, Electricity, Energy, Grid

Ye Xu, David Irwin, Prashant Shenoy

2013-11-01T23:59:59.000Z

380

Lifeline-based global load balancing  

Science Conference Proceedings (OSTI)

On shared-memory systems, Cilk-style work-stealing has been used to effectively parallelize irregular task-graph based applications such as Unbalanced Tree Search (UTS). There are two main difficulties in extending this approach to distributed memory. ... Keywords: distributed work-stealing, global load balancing, uts, x10

Vijay A. Saraswat; Prabhanjan Kambadur; Sreedhar Kodali; David Grove; Sriram Krishnamoorthy

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Flexible loads in future energy networks  

Science Conference Proceedings (OSTI)

We develop a vignette of an information-rich energy network with flexible and responsive electrical loads in the form of a domestic refrigerator augmented with a thermal storage system and a supply-following controller that responds to the availability ... Keywords: renewable, supply-following

Jay Taneja, Ken Lutz, David Culler

2013-01-01T23:59:59.000Z

382

Exercising flexible load contracts: Two simple strategies  

Science Conference Proceedings (OSTI)

A flexible load contract is a type of swing option where the holder has the right to receive a given quantity of electricity within a specified period, at a fixed maximum effect (delivery rate). The contract is flexible, in the sense that delivery (the ... Keywords: energy, exercise strategy, flexibility, swing option, uncertainty

Petter Bjerksund; Bjarte Myksvoll; Gunnar Stensland

2008-03-01T23:59:59.000Z

383

Appliance Commitment for Household Load Scheduling  

Science Conference Proceedings (OSTI)

This paper presents a novel appliance commitment algorithm that schedules thermostatically-controlled household loads based on price and consumption forecasts considering users comfort settings to meet an optimization objective such as minimum payment or maximum comfort. The formulation of an appliance commitment problem was described in the paper using an electrical water heater load as an example. The thermal dynamics of heating and coasting of the water heater load was modeled by physical models; random hot water consumption was modeled with statistical methods. The models were used to predict the appliance operation over the scheduling time horizon. User comfort was transformed to a set of linear constraints. Then, a novel linear, sequential, optimization process was used to solve the appliance commitment problem. The simulation results demonstrate that the algorithm is fast, robust, and flexible. The algorithm can be used in home/building energy-management systems to help household owners or building managers to automatically create optimal load operation schedules based on different cost and comfort settings and compare cost/benefits among schedules.

Du, Pengwei; Lu, Ning

2011-06-30T23:59:59.000Z

384

Propagation in LHM slab loaded rectangular waveguide  

Science Conference Proceedings (OSTI)

The strange properties of Left - Handed Materials (LHM), whose permittivity and permeability are both negative, is briefly introduced. The electric- and magnetic-field components are given in rectangular waveguide loaded with LHM by use of field component ... Keywords: cutoff wavelength, dispersion equation, group velocity, left-handed materials, rectangular waveguide

Rui-Lian Li

2011-09-01T23:59:59.000Z

385

Economic load dispatch using improved harmony search  

Science Conference Proceedings (OSTI)

This paper presents the use of the improved harmony search method for solving economic load dispatch problems. The harmony search method mimics a jazz improvisation process by musicians in order to seek a fantastic state of harmony. To assess the searching ... Keywords: adaptive tabu search, economic dispatch, evolutionary programming, genetic algorithms, particle swarm optimization

T. Ratniyomchai; A. Oonsivilai; P. Pao-La-Or; T. Kulworawanichpong

2010-04-01T23:59:59.000Z

386

Load forecast and treatment of conservation  

E-Print Network (OSTI)

Load forecast and treatment of conservation July 28th 2010 Resource Adequacy Technical Committee conservation is implicitly incorporated in the short-term demand forecast? #12;3 Incorporating conservation in the short-term model Our short-term model is an econometric model which can not explicitly forecast

387

1995 Pacific Northwest Loads and Resources Study.  

Science Conference Proceedings (OSTI)

The study establishes the planning basis for supplying electricity to customers. The study presents projections of regional and Federal system load and resource capabilities, and serves as a benchmark for annual BPA determinations made pursuant to the 1981 regional power sales contracts.

United States. Bonneville Power Administration.

1995-12-01T23:59:59.000Z

388

Valve for fuel pin loading system  

DOE Patents (OSTI)

A cyclone valve surrounds a wall opening through which cladding is projected. An axial valve inlet surrounds the cladding. Air is drawn through the inlet by a cyclone stream within the valve. An inflatable seal is included to physically engage a fuel pin subassembly during loading of fuel pellets.

Christiansen, David W. (Kennewick, WA)

1985-01-01T23:59:59.000Z

389

Valve for fuel pin loading system  

DOE Patents (OSTI)

A cyclone valve surrounds a wall opening through which cladding is projected. An axial valve inlet surrounds the cladding. Air is drawn through the inlet by a cyclone stream within the valve. An inflatable seal is included to physically engage a fuel pin subassembly during loading of fuel pellets.

Christiansen, D.W.

1984-01-01T23:59:59.000Z

390

Independent review of estimated load reductions for PJM's small customer load response pilot project  

SciTech Connect

This study describes the results of a low-cost approach used to measure reported load reductions from a residential electric water heater (EWH) load control program operated as part of PJM Interconnection's Demand Response small customer pilot program. Lawrence Berkeley National Laboratory (LBNL) conducted this independent review of the engineering estimates for EWH load control reported by a Curtailment Service Provider (CSP) at PJM's request. LBNL employed low-cost measurement and verification (M&V) approaches that utilized existing interval metering equipment to monitor results for a series of load control tests. The CSP collected hourly load data for two substations and several hundred households over a six-week period in October and November 2003. During this time period, the CSP operated its electric water heater load control program during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems signifiogram during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems significantly limit our ability to differentiate between control-related and non-control related differences in substation-level load shape data. The usefulness and accuracy of the results were hampered by operational problems encountered during the measurement period as well as in sufficient number of load research grade interval meters at one cooperative. Given the larger sample size at one electric cooperative and more statistically-robust results, there is some basis to suggest that the Adjusted Diversified Demand Factor (ADDF) values used by the CSP somewhat over-state the actual load reductions. Given the results and limitations of the M&V approach as implemented, we suggest several options for PJM to consider: (1) require load aggregators participating in ISODR programs to utilize formal PURPA-compliant load research samples in their M&V plans, and (2) continue developing lower cost M&V approaches for mass market load control programs that incorporate suggested improvements described in this study.

Heffner, G.; Moezzi, M.; Goldman, C.

2004-06-01T23:59:59.000Z

391

Load Balancing Content-Based Publish/Subscribe Systems  

Science Conference Proceedings (OSTI)

Distributed content-based publish/subscribe systems suffer from performance degradation and poor scalability caused by uneven load distributions typical in real-world applications. The reason for this shortcoming is the lack of a load balancing scheme. ... Keywords: PADRES, Publish/subscribe, ToPSS, content-based routing, load balancing, load estimation, offload algorithms, subscriber migration

Alex King Yeung Cheung; Hans-Arno Jacobsen

2010-12-01T23:59:59.000Z

392

Microarchitecture support for improving the performance of load target prediction  

Science Conference Proceedings (OSTI)

Presents a load target prediction scheme that mitigates the impact of load latency for modern microprocessors. The scheme uses a cache-like buffer to provide the base address, offset and operand size at the instruction fetching stage of a pipeline so ... Keywords: load target prediction, load-use stall, pipeline, speculative data access, superscalar procesor

Chung-Ho Chen; Akida Wu

1997-12-01T23:59:59.000Z

393

Classification and forecasting of load curves Nolwen Huet  

E-Print Network (OSTI)

on up to stabilisation of the clusters. Finally, the load profiles are predicted by covariance analysis of electricity customer uses. This load curve is only available for customers with automated meter readingClassification and forecasting of load curves Nolwen Huet Abstract The load curve, which gives

Cuesta, Juan Antonio

394

Vehicle Tank & Loading Rack Meters - 2013-04-22  

Science Conference Proceedings (OSTI)

Vehicle Tank & Loading Rack Meters. Purpose: ... Participants should bring a calculator to the training. Materials & Supplies: ...

2013-06-03T23:59:59.000Z

395

Reliability analysis of RC containment structures under combined loads  

SciTech Connect

This paper discusses a reliability analysis method and load combination design criteria for reinforced concrete containment structures under combined loads. The probability based reliability analysis method is briefly described. For load combination design criteria, derivations of the load factors for accidental pressure due to a design basis accident and safe shutdown earthquake (SSE) for three target limit state probabilities are presented.

Hwang, H.; Reich, M.; Kagami, S.

1984-01-01T23:59:59.000Z

396

United Technologies Corp | Open Energy Information  

Open Energy Info (EERE)

Technologies Corp Technologies Corp Jump to: navigation, search Name United Technologies Corp Place Hartford, Connecticut Zip CT 06101 Sector Hydro, Hydrogen Product UTC is a global technology corporation with activities in aerospace, aviation, helicopter design, climate control, elevator design and hydrogen fuel cells. Coordinates 41.763325°, -72.674069° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.763325,"lon":-72.674069,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

397

United Telecoms Ltd | Open Energy Information  

Open Energy Info (EERE)

Telecoms Ltd Telecoms Ltd Jump to: navigation, search Name United Telecoms Ltd. Place Bangalore, Karnataka, India Zip 560 048 Sector Solar Product Bangalore-based firm involved in etting up telecom networks, e-governance networks and solutions including transport sector. The firm is also setting up solar project. Coordinates 12.97092°, 77.60482° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":12.97092,"lon":77.60482,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

398

Links to on-line unit conversions  

Science Conference Proceedings (OSTI)

... Basic physical quantities. General unit, currency, and temperature conversion. ... Many conversions, including unusual and ancient units. ...

399

Comparisons of Short Term Load Forecasting using Artificial Neural Network and Regression Method  

E-Print Network (OSTI)

In power systems the next day’s power generation must be scheduled every day, day ahead short-term load forecasting (STLF) is a necessary daily task for power dispatch. Its accuracy affects the economic operation and reliability of the system greatly. Under prediction of STLF leads to insufficient reserve capacity preparation and in turn, increases the operating cost by using expensive peaking units. On the other hand, over prediction of STLF leads to the unnecessarily large reserve capacity, which is also related to high operating cost. the research work in this area is still a challenge to the electrical engineering scholars because of its high complexity. How to estimate the future load with the historical data has remained a difficulty up to now, especially for the load forecasting of holidays, days with extreme weather and other anomalous days. With the recent development of new mathematical, data mining and artificial intelligence tools, it is potentially possible to improve the forecasting result. This paper presents a new neural network based approach for short-term load forecasting that uses the most correlated weather data for training, validating and testing the neural network. Correlation analysis of weather data determines the input parameters of the neural networks. And its results compare to regression method. Index terms Load Forecasting, artificial neural network, short term

Mr. Rajesh Deshmukh; Dr. Amita Mahor

2011-01-01T23:59:59.000Z

400

" Million U.S. Housing Units"  

U.S. Energy Information Administration (EIA) Indexed Site

3 Lighting Usage Indicators by Type of Housing Unit, 2005" " Million U.S. Housing Units" ,,"Type of Housing Unit" ,"Housing Units (millions)","Single-Family Units",,"Apartments in...

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Million U.S. Housing Units Total...............................  

U.S. Energy Information Administration (EIA) Indexed Site

Attached 2 to 4 Units Table HC2.12 Home Electronics Usage Indicators by Type of Housing Unit, 2005 5 or More Units Mobile Homes Type of Housing Unit Housing Units (millions)...

402

Current Name Academic Unit Request  

E-Print Network (OSTI)

Current Name Academic Unit Request Department/College/School/Institute/Center Names: New or Changes This form is to be used to request new academic units (departments, colleges, schools, institutes, or centers) or to request changes to existing academic units. Complete the following and submit

Hart, Gus

403

Technical Update: Load Modeling in Power System Studies  

Science Conference Proceedings (OSTI)

EPRI has been engaged in load modeling research since the 1980’s. In the past, EPRI conducted significant research in the area of load modeling and worked together with the Western Electricity Coordinating Council (WECC) Load Modeling Task Force in the development of the new composite load model developed and currently to be deployed in WECC. This work included extensive testing of various load components, such as residential air-conditioners, in the EPRI laboratories in Knoxville, TN. In ...

2013-12-10T23:59:59.000Z

404

Conductor Wind Loading--Results of EPRI Field Validation Studies  

Science Conference Proceedings (OSTI)

A comprehensive evaluation of current wind load methods indicates that several factors can adversely affect the performance of wind load models. There are wide variations and biased values associated with some of the wind parameters, and inaccurate drag coefficient and air density values can influence the wind load models. Several modified approaches were tested to properly incorporate wind gusts and spatial effects in wind load calculations. The improvement in the wind load predictions made by some of t...

1995-05-12T23:59:59.000Z

405

Comparison of Zone Cooling Load for Radiant and All-Air Conditioning Systems  

E-Print Network (OSTI)

change the cooling load profile for the mechanical systems.and the resulting cooling load profile has been reported inimplications for cooling load profile and peak cooling load

Feng, Jingjuan; Schiavon, Stefano; Bauman, Fred

2012-01-01T23:59:59.000Z

406

Estimating Demand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Buildings in California  

E-Print Network (OSTI)

energy  use  for  space  conditioning,  non? weather Physically,  space?conditioning  loads  are  affected  by 

Coughlin, Katie; Piette, Mary Ann; Goldman, Charles; Kiliccote, Sila

2008-01-01T23:59:59.000Z

407

Load-shape modeling in southeastern utility systems  

SciTech Connect

Load models are tools which have a wide range of application in the electric-utility industry. Some uses include monitoring load-management policies and helping with on-line commitment problems. The output from a load model can be placed in a suitable software environment where daily load curves are computed and displayed. Also, load models can be extended to perform forecasting functions. A weather sensitive load model that takes into account both weekdays and weekends on an hourly basis has been developed and applied to load shape modeling and short term forecasting on three southeastern electric utilities. A software package associated with the load modeling theory was developed and tested. This load-modeling program computes the daily load curve in terms of identifiable components. The program uses historical hourly load data to compute coefficients related to load components including base, growth, seasonal and weather. These coefficients can be used in a mathematical model to compute an estimate of the daily load curve with load values for each hour of the day. The load-modeling procedure described employs a linear least squares method for computing coefficients in the mathematical model.

Lebby, G.L.

1985-01-01T23:59:59.000Z

408

2012 CERTS LAAR Program Peer Review - Integration and Extension of Direct Load Management of Smart Loads - Anna Scaglioni, UC Davis  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integration and Extension of Direct Integration and Extension of Direct Load Management of Smart Loads Anna Scaglione, UC Davis GRA: Mahnoosh Alizadeh Project objective  Invent methods to "store" load demand for * Real-time "generation following" * Integration of load reserves as dispatchable assets in the Energy Market  Architecture for virtual "reserves" (queues) of electrical load demand * Watts to Job mapping (analysis)  Captures digitally the service requirements - Equal service type = Equal queue * Job to Watts mapping (synthesis)  Allows to optimally schedule the load profile Major technical accomplishments  Centralized model: Digital Direct Load Scheduling (DDLS) - Year 1-Year 2

409

A new generation of load sharing algorithms: the semi-adaptive load sharing algorithm  

E-Print Network (OSTI)

Distributed systems have become a popular computing environment. Due to their high potentials in improving performance and resource sharing, the evolution and maturing of technologies such as networks and computer hardware, have led to more realizations of distributed computing capabilities. One of the key factors that impacts the system's performance is how load sharing is handled. Most of the work done in load sharing algorithms focused on either one of two approaches: the static approach, or the dynamic approach. Static load sharing is characterized with its simplicity and minimal overhead induced on the system when performing load distribution. This is attributed to the fact that their load sharing decisions do not require any information exchange between nodes. However, static algorithms are not capable of adapting to traffic changes. Hence, this will affect the distributed system adaptability and stability features against load alteration. The second approach in load sharing algorithums is the dynamic approach. In this approach, nodes base their sharing decisions on the knowledge of the status on other nodes. This knowledge enables nodes to make improved decisions when selecting a remote execution site. Therefore, these algorithms provide the distributed system with adaptability and stability. Nevertheless, information exchange between nodes has proven to be expensive. The problem lies in the communication and processing overheads which these algorithms impose on the system. This research work presents a Semi-Adaptive load sharing approach that attempts to lay a common ground between the dynamic and the static approaches. This approach provides the system with adaptability features at are supplied with tools to control the level of adaptability and information exchange in the system. It is argued that this approach is adaptable, scalable, stable, fault tolerant, and will generate low and controlled system overheads. Two implementations of the Semi-Adaptive approach are presented: The Controller Load Sharing Protocol (CLSP) and The Pool Load Sharing Protocol (PLSP). The study of CLSP and PLSP include simulating their performance under various conditions. The simulation include comparing the performance of these two protocols against two load sharing algorithms representing the static and dynamic families. Furthermore, the properties of CLSP and PLSP are investigated. Finally, based on the study and analysis of both protocols, the research work proposes possible areas of improvement in the final conclusion.

Morsy, Hazem Kamal

1997-01-01T23:59:59.000Z

410

NREL: Vehicle Ancillary Loads Reduction - Integrated Modeling  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Modeling Integrated Modeling NREL's Vehicle Ancillary Loads Reduction (VALR) team predicts the impact of advanced vehicle cooling technologies before testing by using an integrated modeling process. Evaluating the heat load on a vehicle under real world conditions is a difficult task. An accepted method to evaluate passenger compartment airflow and heat transfer is computational fluid dynamics. (CFD). Combining analytical models with CFD provides a powerful tool to assist industry both on current vehicles and on future design studies. Flow chart showing the vehicle integrated modeling process which considers solar radiation, air conditioning, and vehicles with CAD, glazing, cabin thermal/fluid, and thermal comfort modeling tools. Results are provided for fuel economy, tailpipe emissions and occupant thermal comfort.

411

Calculations of slurry pump jet impingement loads  

SciTech Connect

This paper presents a methodology to calculate the impingement load in the region of a submerged turbulent jet where a potential core exits and the jet is not fully developed. The profile of the jet flow velocities is represented by a piece-wise linear function which satisfies the conservation of momentum flux of the jet flow. The adequacy of the of the predicted jet expansion is further verified by considering the continuity of the jet flow from the region of potential core to the fully developed region. The jet impingement load can be calculated either as a direct impingement force or a drag force using the jet velocity field determined by the methodology presented.

Wu, T.T.

1996-03-04T23:59:59.000Z

412

Two-phase jet loads. [PWR  

Science Conference Proceedings (OSTI)

Two-phase jets are currently being studied to improve engineering models for the prediction of loads on pipes and structures during LOCAs. Multi-dimensional computer codes such as BEACON/MOD2, CSQ, and TRAC-P1A are being employed to predict flow characteristics and flow-structure loading. Our ultimate goal is to develop a new approximate engineering model which is superior to the F.J. Moody design model. Computer results are compared with data obtained from foreign sources, and a technique for using the TRAC-P1A vessel component as a containment model is presented. In general, good agreement with the data is obtained for saturated stagnation conditions; however, difficulties are encountered for subcooled stagnation conditions, possibly due to nucleation delay and non-equilibrium effects.

Tomasko, D.

1980-01-01T23:59:59.000Z

413

Verti Jack Pumping Unit evaluation  

Science Conference Proceedings (OSTI)

The Verti Jack Pumping Unit was tested primarily to establish the energy comsumption efficiency of the unit as compared with that of conventional pumping unit. Before the unit was field tested, extensive static testing was performed to determine the effect of the counterbalance system throughout the operational cycle. The field test included comparing the performance of the Verti Jack Unit and conventional pump jacks - a Bethlehem 16 and Cabot 25 pumping unit. The Verti Jack unit was operated at four different pumping conditions. The Verti Jack unit peformed satisfactorily during the testing. Only minor problems that could not be attributed to the design or operation of the unit were encountered. Changing the stroke length was difficult in the field, but such operational problems were expected in operating the first phototype and can be corrected on future models. During the higher pumping rate tests of the Verti Jack unit, the well ceased to deliver fluid quantities at rates adequate to the pumping rate. These data are shown in table 8. Therefore, evaluation data are based on theoretical pump performance and are presented in table 9. The data show that the Verti Jack is more efficient than the conventional units tested. The most direct comparison was the Verti Jack test at 36-inch stroke and 12 1/2 strokes per minute versus the Cabot unit at 37-inch stroke and 12 strokes per minute. In the comparison the Verti Jack operated about 24 percent more efficiently than the Cabot unit. Comparing the summation of all Verti Jack tests with that of all conventional unit tests, the Verti Jack operated about 15 percent more efficiently. Compared to the Cabot unit only, the Verti Jack was about 17 percent more energy efficient. 13 figs., 12 tabs.

Porter, R.; Spence, K.

1985-11-01T23:59:59.000Z

414

EPRI/GRI Load Shape Workshop: Load Data Analysis for Gas and Electric Markets  

Science Conference Proceedings (OSTI)

Load shapes, representing usage patterns in the electric and gas industry, are a key factor in energy company operations and management. In the emerging restructured energy market, retail energy suppliers market energy to final customers and must arrange for electricity generation or gas delivery to meet their customers' needs. EPRI and GRI sponsored a two-day workshop in June, 1999 that addressed a range of issues associated with load shapes, including modeling, profiling for retail market settlement, r...

1999-11-10T23:59:59.000Z

415

Electricity pricing for conservation and load shifting  

Science Conference Proceedings (OSTI)

The electricity industry is facing the challenge of increasing costs of reliably meeting demand growth and fully complying with legislative renewable portfolio standards and greenhouse gas reduction targets. However, an electric utility's existing tariffs often don't have rates that increase with consumption volume or vary by time of use, thus not fully exploiting the potential benefits from customer conservation and load shifting. (author)

Orans, Ren; Woo, C.K.; Horii, Brian; Chait, Michele; DeBenedictis, Andrew

2010-04-15T23:59:59.000Z

416

Composition containing aerogel substrate loaded with tritium  

DOE Patents (OSTI)

The invention provides a process for loading an aerogel substrate with tritium and the resultant compositions. According to the process, an aerogel substrate is hydrolyzed so that surface OH groups are formed. The hydrolyzed aerogel is then subjected to tritium exchange employing, for example, a tritium-containing gas, whereby tritium atoms replace H atoms of surface OH groups. OH and/or CH groups of residual alcohol present in the aerogel may also undergo tritium exchange.

Ashley, Carol S. (Albuquerque, NM); Brinker, C. Jeffrey (Albuquerque, NM); Ellefson, Robert E. (Centerville, OH); Gill, John T. (Miamisburg, OH); Reed, Scott (Albuquerque, NM); Walko, Robert J. (Albuquerque, NM)

1992-01-01T23:59:59.000Z

417

Load diagram for a perforated plate tray  

E-Print Network (OSTI)

1 decimals noggrannhet c. Upprita i x,y-diagrammet q-linjen och bestäm (grafiskt, eller med must be produced. The feed stream F is a saturated liquid, i.e. q = 1, while the reflux ratio R = 1Load diagram for a perforated plate tray vG, vL: velocities G, L: densities QL, QG: volume flows H

Zevenhoven, Ron

418

United States Government Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Department of Energy United States Government Memorandum DATE: March 21, 2008 Audit Report Number: OAS-L-08-08 REPLY TO ATTN OF: IG-321 (A07LV042) SUBJECT: Audit Report on "Accountability of Sensitive and High Risk Property at the Nevada Site Office" TO: Acting Manager, Nevada Site Office INTRODUCTION AND OBJECTIVE and control over sensitive and high risk property because of the vulnerability to loss, theft or misuse and its potential impact on national security interests or proliferation concerns. Items such as portable and desktop computers, ammunition. and firearms are examples of sensitive property. In addition, federal regulations require that Departmental organizations and designated contractors account for and control govemroent-owned high risk property, such as body armor and gas masks,

419

United States Government DATE:  

Office of Legacy Management (LM)

5oE(E;,8 ' 0 H .2+ L-1 5oE(E;,8 ' 0 H .2+ L-1 United States Government DATE: MAR 0 8 1994 REPLY TO AlTN OF: EM-421 (W. A. Williams, 903-8149) SUBJECT: Authority Determination -- Former Herring-Hall-Marvin Safe Co., Hamilton, Ohio TO: The File The attached review documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the former Herring-Hall-Marvin Safe Co. facility in Hamilton, Ohio, under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The facility was used for the shaping and machining of uranium metal by the Manhattan Engineer District (MED) during the Second World War. The following factors are significant in reaching a decision and are discussed in more detail in the attached authority review:

420

United States Government  

Office of Legacy Management (LM)

D;il$;,8 p! A . I I& - ' D;il$;,8 p! A . I I& - ' z United States Government &mtrne&' of Energy DATE: &uG 3, 9 394 REPLY TO AITN OF: EH-421 (W. A. Williams, 427-1719) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Mr. Doug Toukay and Ms. Michelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recommdations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Unite2 States Government  

Office of Legacy Management (LM)

+39J +39J t% (3740~ - Unite2 States Government m e m o randuin L3 DATE: AU6 3, 9 %g4 REPLY TO All-N OF: m -421 (U. A. W illiams, 427-1719) -. - >' SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Hr. Doug Toukay and Ms. M ichelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recouwndations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the

422

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LICE F 137: r.e Electr LICE F 137: r.e Electr onic Form App roved by CllR - 1010fJI2002 i/JI~~I United States Government Department of Energy Bonneville Power Admi istration memorandum DATE : REPLY TO AnN OF : KEPR-4 SUBJECT: Environmental Clearance Memorandum TO: Stephen Duncan Project Manager - TERS-3 Proposed Action: Removal of de-stabilized and downed trees resulting from a December 200 8 wind storm on the de-energized Lyons Ultra High Voltage Test Line NO.1. PP&A Project No.: PP&A 1309 Budget Information: Work Order # 184006 Categorical Exclusion Applied (from Subpart 0, 10 C.F.R. Part 1021): B 1.3 Routine maintenance/custodial services for buildings, structures, infrastructures, equipment. Location: Fee-owned ROW on the de-energized Lyons UHV Te st Line No .1 to the south of

423

United States Government Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B.89) B.89) EFO (07-90) United States Government Department of Energ Memorandum SEP 24 20t DATE: REPLY TO: IG-34 (A04TG032) Audit Report No.: OAS-L-04-21 SUBJECT: Evaluation of "The Federal Energy Regulatory Commission's Cyber Security Program - 2004" TO: Chairman, Federal Energy Regulatory Commission The purpose of this report is to inform you of the results of our annual evaluation of the Federal Energy Regulatory Commission's unclassified cyber security program. This evaluation was initiated in June 2004 and our field work was conducted through September 2004. The evaluation methodology is described in the attachment to this report. Introduction and Objective The Commission's increasing reliance on information technology (IT) is consistent with satisfying the President's Management Agenda initiative of expanding electronic

424

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

/18/04 THU 11:31 FAX 423 241 3897 OIG -- /18/04 THU 11:31 FAX 423 241 3897 OIG -- + HQ 1002 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum DATE: March 17, 2004 Audit Report No. OAS-L-04-1 1 REPLY TO IG-36 (A04DN003) ATTN OF: SUBJECT; Audit of "Requests for Equitable Adjustment at the Rocky Flats Environmental Technology Site" TO: Frazer R. Lockhart, Manager, Rocky Flats Project Office INTRODUCTION AND OBJECTIVE Effective February 1, 2000, the Department of Energy's (Department) Rocky Flats Project Office (RFPO) and Kaiser-Hill Co., LLC (Kaiser-Hill), entered into a cost- plus-incentive-fee contract to close the Rocky Flats Environmental Technology Site (Rocky Flats) by December 15, 2006. Under the contract terms, Kaiser-Hlill's final incentive fee earned will be based on how well it meets established cost targets. For

425

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . . .... ...... ..... .. . .. . . .. . , . . . . ..- - --. -- -. , . . DOEF 1325,8 (08.93) United States Government Department of Energy memorandum DATE: August 13, 2007 1 Audit Report Number: OAS-L-07-21 REPLY TO ATTN OF: IG-32 (A06PR047) SUBJECT: Audit of Executive Compensation at Selected National Nuclear Security Administration Sites TO: Director, Policy and Internal Controls Management, NA-66 INTRODUCTION AND OBJECTIVE As part of a Department of Energy-wide audit of executive compensation, we reviewed fourN* Lti nai-.AL 4 ... :.. ,._*i Amiinistration (NiNSA)SsitCe. Speuiiiu-~l we reviewed executive cormpeisation costs incurred and claimed for Fiscal Years 2003, 2004, and 2005 at Los Alamos National Laboratory (LANL), Lawrence Livermore National Laboratory (LLNL), Sandia National Laboratories, and the Y-12

426

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 DOE F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: April 23, 2004 Audit Report Number: OAS-L-04-16 REPLY TO ATTN OF: IG-35 (A04YT023) SUBJECT: Audit Report on "Modernization Activities at the Y-12 National Security Complex" TO: Richard Speidel, Director, Policy and Internal Controls Management, NA-66 INTRODUCTION AND OBJECTIVE As part of the National Nuclear Security Administration's (NNSA) nuclear weapons complex, the Y-12 National Security Complex (Y-12) performs critical roles in strengthening national security and reducing the global threat from weapons of mass destruction. The Y-12 modernization plan (plan) seeks to foster the development of a physical plant that is efficient and effective in serving its national security missions. The

427

. United States Government  

Office of Legacy Management (LM)

,:n5.5.8 ,:n5.5.8 ,849, EfG pw, . United States Government DATE: AUG 2 i994 y#J;; EM-421 (W. A. Williams, 427-1719) sUBJECT: -Elimination of the Robbins & Myers Site, Springfield, Ohio 11179 I The File TO: I have reviewed the attached elimination recommendation and the original historical records for the Myers & Robbins facility in Springfield, Ohio. I have determined that there is little likelihood of radioactive contamination at these sites. The only record of activity at this site by Department of Energy predecessors is an equipment test of a pump in March 1975. This test involved limited amounts of radioactive materials and there was a serious effort to decontaminate the equipment at the conclusion of the tests. Based on the above, the Myers & Robbins site in Springfield, Ohio, is

428

United States Government  

Office of Legacy Management (LM)

DOE F 1325.8 DOE F 1325.8 E&M&& +\A .wz United States Government Department of Energy DATE: RUG 3, 9 %g4 y;;;; EM-421 (W. A. W illiaas, 427-1719) "; :+ 1 SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of M r. Doug Tohkay and Ms. M ichelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recomendations were made to eliminate then from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the

429

Uniter+ States Government  

Office of Legacy Management (LM)

EFG (07-90) EFG (07-90) Uniter+ States Government ~L.aQ-i; Department of Energy inemorandum DATE: SEP 2 5 1992 REPLY TO Al-fN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at the Former Dow Chemical Company Facility in M a d ison, Illinois TO: L. Price, OR The site of the Former Dow Chemical Company in M a d ison, Illinois, which is currently owned and operated by the Spectrulite Consortium, is designated for inclusion in the Formerly Utilized Sites Remedial Action Program (FUSRAP). This designation is based upon the results of a preliminary radiological survey and other information described in the attached Designation Summary. The authority determination and preliminary survey report also are attached for information. The site has been assigned a low priority under the FUSRAP protocol, as

430

United States Government  

Office of Legacy Management (LM)

# Xx i' # Xx i' !325 8 I c&egJw, i&l d, 4 -1 United States Government Department of Energy DATE; AUG 3, 9 !gg4 I REPLYTo m-421 (W. A. Williams, 427-1719) sy I AlTN OF: SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Mr. Doug Tonkay and Ms. Nichelle Landis, I reviewed a number of sites that had formerly provided goods a&/or services to the Fernald facility as subcontractors. For 24 of these sites, recoumendations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

431

United States Government  

Office of Legacy Management (LM)

EFS (07-W EFS (07-W United States Government memorandukn Department of Energy j ; I.-- ' -i;: /J DATE: j.gjG 2 9 1994 REPLY TO En-421 (W. A. Williams, 427-1719) AlTN OF: h p)\;--/ ;,;' J ( SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of Ur. Doug Tonkay and Us. Michelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recoPraendations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

432

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

nUnited States Government Department of Energy Bonneville Power Administration memorandum REPLY TO AnN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum TO: Robert Macy Project Manager - TELF-TPP-3 Proposed Action: Access road improvement and bridge replacement for the Raver-Paul No. transmission line structure 18/1. Budget Information: Work Order # 00220048 PP&A Project No.: 954 Proposed by: Bonneville Power Administration (BPA) Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities .. .for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective ....are required to

433

United States Government Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8/16/07 09:15 FAX 301 903 4656 CAPITAL REGION 8/16/07 09:15 FAX 301 903 4656 CAPITAL REGION * 002 DOE F 1325.8 (08-93) Department of Energy United States Government Memorandum DATE: August 15, 2007 Audit Report Number: OAS-L-07-22 REPLY TO ATTN OF: IG-34 (A06GT006) SUBJECT: Report on "Hazardous Chemicals Inventory Management at the Savannah River Site" TO: Manager, Savannah River Operations Office BACKGROUND The Savannah River Site (Savannah River) maintains large inventories of hazardous chemicals for its scientific, environmental cleanup and production operations. Many of these chemicals are known carcinogens; some are corrosive, while others are highly flammable. As such, these chemicals can pose serious health and safety risks to workers and members of the public, the environment, and to emergency first responders if not properly managed and controlled.

434

,. United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

i. 001 i. 001 DOE F 1325.8 (8-89) EFG (07-90) ,. United States Government Department of Energy memorandum DATE: September 11, 2003 REPLYTO: IG-34 (A03NE045) Audit Report No.: OAS-L-03-20 SUBJECT: Audit of Procurement Administration at the Oak Ridge National Laboratory TO: Director, Office of Management, Budget and Evaluation/Chief Financial Officer, ME-1 The purpose of this report is to inform you of the results of our survey of procurement administration at the Oak Ridge National Laboratory (Laboratory). This review was initiated in May 2003 and fieldwork was conducted through August 2003. Our review methodology is described in an attachment to this report. INTRODUCTION AND OBJECTIVE In Fiscal Year (FY) 2002, the Department of Energy's (Department) management contractors procured approximately $6.4 billion worth of goods and services from

435

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31/07 THU 18:20 FAX 865 241 3897 OIG --- HQ 31/07 THU 18:20 FAX 865 241 3897 OIG --- HQ 00 DOE F 1325.8 (08&93) United States Government Department of Energy memorandum DATE: May 31, 2007 Audit Report Number: OAS-L-07-13 REPLY TO ATTN OF: IG-32 (A07RL048) SUBJECT: Audit of Safety Allegations Related to the Waste Treatment Plant at the Hanford Site TO: Manager, Office of River Protection INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Hanford Site is responsible for treating and preparing 53 million gallons of radioactive and chemically hazardous waste for disposal. Bechtel National, Inc. (Bechtel) is designing, building and commissioning the Waste Treatment Plant (Plant), a category II nuclear facility, which is comprised of a complex of treatment facilities to vitrify and immobilize radioactive waste into a

436

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OEF 1325.8 OEF 1325.8 (U8-93) United States Government Department of Energy memorandum DATE: April 11, 2007 Audit Report Number: OAS-L-07-I1 REPLY TO ATTN OF: IG-32 (A07DN056) SUSJECT: Audit of the Department of Energy's Community and Regulatory Support Funding at the Richland Operations Office TO: Manager, Richland Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Office of Environmental Management provided $60.1 million in Community and Regulatory Support funding in Fiscal Year (FY) 2005 to a number of Departm- nt sites. The funding is intended to be used for activities indirectly related to nuclear and hazardous waste cleanup, such as agreements with state regulatory agencies and transportation departments. During FY 2005, the Department's Richland

437

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a . a . r-z . "*& ., . .. uoi UA o. --.- flI gj UUX DOE F 1325.8 (08.93) United States Government Department of Ene memorandum DATE: August 19, 2004 Audit Report Number: OAS-L-04-18 REPLY TO ATTN OF: IG-36 (A03IF009) SUBJECT: Audit of the "Revised Pit 9 Cleanup Project at the Idaho National Engineering and Environmental Laboratory" TO: Paul Golan, Acting Assistant Secretary, Office of Environmental Management INTRODUCTION AND OBJECTIVE The Idaho National Engineering and Environmental Laboratory's (iNEEL) subsurface disposal area was established in 1952 for disposal of solid radioactive waste and now encompasses an area of approximately 88 acres. Wastes from the INEEL and other Department of Energy (Department) sites, rmost notably Rocky Flats, were buried in

438

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

vu & . vu & . ,I / v a L U ; .8 " ',X v &..'*. "o uu V"x Ijo tf J ,*- , , i 4 w i tiJ U U 1 OEF S.a 135 (0B93) United States Government - Department of Energy memorandum DATE: February 27, 2007 REPLY TO Audit Repor Number: OAS-L-07-08 ATTN OF: IG-32 (A06ID015) SUBJECT: Audit of the "Design of the Engineered Barrier System at the Yucca Mountain Site" TO: Principal Deputy Director, Office of Civilian Radioactive Waste Management INTRODUCTION AND OBJECTrVE In accordance with the Nuclear Waste Policy Act of 1982, the Department of Energy's (Department) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for designing, licensing, constructing, and operating a repository, known as Yucca Mountain, for the permanent disposal of spent nuclear fuel and high-level -

439

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

F 1325.8 F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: August 13, 2007 . . Audit Report Number: OAS-L-07-18 REPLY TO ATTN OF: IG-32 (A07PR061) SUBJECT: Audit of Executive Compensation at Brookhaven National Laboratory TO: Manager, Brookhaven Site Office INTRODUCTION AND OBJECTIVE As part of a Department of Energy-wide audit of executive compensation, we reviewed executive compensation at the Office of Science's Brookhaven National La --- _ .r . . tc. av .... n . Ou audit covered executive cuupoci'A ;is in curred and claimed for Fiscal Years 2003, 2004, and 2005. Brookhaven Science Associates, LLC, operated Brookhaven under Department of Energy (Department) contract number DE-AC02-98CH10886. The amount of executive compensation that can be reimbursed to Department

440

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

')/06 MON 14:28 FAX 423 241 3897 OIG ')/06 MON 14:28 FAX 423 241 3897 OIG --- HQ 1o001 ,O " F 1325.8 (08-93) United States Government Department of Energy memorandum DATE: April 10, 2006 Audit Report No.: OAS-L-06-11 REPLY TO ATTN OF: IG-32 (A05ID043) SUBJECT: Audit of "Contract Transition Activities at the Idaho Operations Office" TO: Manager, Idaho Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's Idaho Operations Office has ongoing missions focused primarily in the areas of nuclear energy and environmental cleanup. From October 1, 1999 to February 1, 2005, Bechtel BWXT Idaho, LLC (Bechtel) managed facility operations for both of these missions. In Fiscal Year 2005, two separate contracts began in order to add focus and clarity to each respective mission. First, the Idaho National

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-93) -93) United States Government Department of Energy memorandum DATE: July 12, 2007 Audit Report Number: OAS-L-07-15 REPLY TO ATnN OF: IG-32 (A07ID055) SUBJECr: Audit of the Idaho National Laboratory Facility Footprint Reduction TO: Manager, Idaho Operations Office INTRODUCTION AND OBJECTTVE On February 1, 2005, Battelle Energy Alliance, LLC (BEA) assumed responsibility for managing and operating the Idaho National Laboratory (INL) for the Department of Energy (Department) under a new 10 year contract. ThI m.ion for ,the L s to nntance the Nation's energy security by becoming the preeminent, internationally recognized nuclear energy research, development, and demonstration laboratory.. To accomplish this mission, BEA proposed aggressive infrastructure initiatives

442

United States Government Departmen  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7/05 TUE 07:58 FAX 423 241 3897 OIG -** HQ @]002 7/05 TUE 07:58 FAX 423 241 3897 OIG -** HQ @]002 DOE F 1325.8 (08-93) United States Government Departmen of Energy memorandum DATE: December 20, 2005 Audit Report Number: OAS-L-06-03 REPLY TO A1TN OF; IG-36 (A05SR025) SUBJECT: Audit of "Defense Waste Processing Facility Operations at the Savannah River Site" TO: Jeffrey M. Allison, Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy's (Department) Savannah River Site stores approximately 36 million gallons of liquid, high-level radioactive waste in 49 underground waste storage tanks. The contents of the waste tanks are broadly characterized as either "sludge waste" or "salt waste". Sludge waste is insoluble and settles to the bottom of a waste tank, beneath a layer of liquid supernate. Salt

443

* United States Government  

Office of Legacy Management (LM)

-- -- DE;$r,e /q f-j * I3 - I * United States Government memorandum MAY 21 I991 DATE: REPLY TO Al-fN OF: 4ih55YhL Department of Energy JT:,i 5, f&A 0 ' - j4.~, ' -/ jl.a' \ A t -3 __..-_-. EM-421 SUBJECT: Elimination of the American Potash and Chemical Site The File TO: I have reviewed the attached site summary and elimination recommendation for the American Potash and Chemical Company Site in West Hanover, Massachusetts. I have determined that there is little likelihood of radioactive contamination at this site. Based on the above, the American Potash and Chemical Company site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Alexander Williams, PhD Designation and Certification Manager

444

United States Goveinment  

Office of Legacy Management (LM)

,325.B ,325.B jO8.93) United States Goveinment ~~~rntir-andu~rvi Depr?rtnient of Energy \L, IO' " 1' !ATE:' MAY i o 1995 ,' Kzb9. ":cz$ EM-421 (W.,A. Williams, 301-903-8149) SUBJECT: Records for the West Chicago Site .The File TO: After review.of the available r&rds concerning the former 'Lindsay Light and Chemical.Corhpany site in West Chicago, Illinois. I have determined that it is not necessary to transmit Department of Energy (DOE) records to the municipa,llty to inform public officials of the activities at this ~ site. This site has been licgnsed by the Nuclear Regulatory Commission (NRC) for many.years, and the nature of the. rare'earth and thorium production at the site, are well known. Remediation of this faci'lity ii~ being addressed by the current owner, 'the NRC, the U.S; Environmental

445

; United States Government  

Office of Legacy Management (LM)

Don F 1328.8 Don F 1328.8 . . .449J ' Em wm ; United States Government , % - memorandum L c*m Al.)G 2 9 a34 yz;; EM-421 (If. A. Willlams, 427-1719) lq,iMAL Department of Energy m5 MA, \i& SUBJECT: Elimination of the Sites from the Formerly Utllized Sites Remedial A&Ion Prograa ' a The File In 1990, with the assistance of Hr. Doug Tonkay and Ms. Htchelle L&is, I reviewed a number of sites that had fomerly provided goods and/or services to the Fernald faclllty as subcontractors. For 24 of.these sites, recoarwndations were ude to eliainate thm from further consideratton under Formerly Utilized Sites Reaedial Actlon Progrm (FUSRAP). In each case, I made or revlewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

446

UNITED STATES GOVERNMENT  

Office of Legacy Management (LM)

'.... '|le , * f C. '.... '|le , * f C. Office Memorandum · UNITED STATES GOVERNMENT .-- J TO ' Leo Graup, Chief, DATE: September 29, 1958 Property Management Branch rFi0 : M. S. Weinstein Industrial Hygiene Branch, HASL SUBJBT: SURVEY AT HAIST PROPETIY SYMBOL: HSH:MSW. Thisl property was purchased during MED operation and used as a dumping ground for refinery residues generated by Linde Air Products during their period of participation in the refinery operations program. \It 2 consists of 10 acres in addition to a perpetual .ease- ment right to a strip of land, 10 feet wide and 3600 feet long. The area is located in North Tonawanda, New York near the Niagara River. Because of the growth of adjacent industries, this particular piece of property has appreciated in value. During its tenure as responsible property management office, Oak

447

United States Government  

Office of Legacy Management (LM)

OOE F 1325.8 OOE F 1325.8 - EFgzk3) United States Government tiemorandum 0 wt;? -J Department of Energy DATE: SEP 2 5 1992 REPLY TO Al-TN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at Diamond Magnesium Site in Painesville, Ohio TO: L. Price, OR The former Diamond Magnesium Company site located at 720 Fairport-Nursery Road in Painesville, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). The site is owned by Uniroyal Chemical Company and by Lonza Chemical, Incorporated. This designation is based on the results of a radiological survey and conclusions from an authority review as noted in the attached Designation Summary. Copies of the radiological survey reports and the authority

448

United States Government  

Office of Legacy Management (LM)

Z&Et,? y-p . c' Z&Et,? y-p . c' )7q/ I cuq,~ United States Government Department of Energy memoranduin I " . : I ;/ ,I DATE: hufi 2 9 1594 \ ' - y:oTFq M-421 (W. A. Ylllius, 427-1719) ' ii Y - SIJWECT: Elimination of the Sites from the Formerly Utilfzed Sites Remedial Actjon Progru TO The File In 1990, with the assistance of Mr. reviewed a number of sites that had services to the Fernald facility as sites, recommendations were made to ___ _- _ consideration under Formerly Utiltzed Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites and to ratify and confirm the prior elimination of each site froa FUSRAP.

449

United States Government  

Office of Legacy Management (LM)

DOE F t325.8 DOE F t325.8 (s8s) Dl? l 36-z EFG (07-90) United States Government m e m o randum Department of Energy DATE: LUG 2 ' 3 1394 ",cl,'," EM-421 (W. A. W illiams, 427-1719) SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of M r. Doug Tonkay and Ms. M ichelle Landis, I reviewed a number of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of these sites, recoamnendations were aade to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

450

- United States Government  

Office of Legacy Management (LM)

8 8 my EFG (07.90) . - United States Government . * Department of. Energy * inemorandum DATE: DEC :! ;j 1993 REPLY TO ATTN OF: EM-421 (W.'A. W illiams, 903-8149) : NY 41 I .' 41 G I? SUBJECT: Elimination of the T itanium Alloy Manufacturing Co., Niagara Falls, New York TO: The F ile I have reviewed the attached site. summary and elimination recommendation for the T itanium Alloy Manufacturing Company. I have determined that the potential for radiological contamination is low because of the lim ited duration of the activities at the site. Further, at least some of the contractual activities at the site were licensed under the Atomic Energy Act, and the licensed activities are thereby disqualified from further consideration under the Department of Energy's Formerly Utilized Sites

451

United States Government  

Office of Legacy Management (LM)

UOEF 1325.8 UOEF 1325.8 (5831 , - a.. L . . L. . c ,, . . . t ,' <, .* -,. .--1^ a "-2 (J 7 , pe-;L, United States Government memorandum Departmen: of Energy DATEAUG 1 0 1984 REPLY TO Al-fN OF: NE-20 SUBJECT: Action Description Memorandum (ADM) Review: Wayne, New Jersey Proposed 1984 Remedial Actions at TO: File After reviewing all of the pertinent facts including the attached Action Description Memorandum (ADM), I have determined that the remedial action described in the subject ADM is an action which in and of itself will have a clearly insignificant impact on the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA), 42 U.S.C. 4321 et seq. The Conference Report accompanying the Energy and Water Appropriation Act

452

United States Government  

Office of Legacy Management (LM)

I8 891 I8 891 EFG (07.90) United States Government m e m o randum bepartrne% of Energy -P ' ; N. A *I Pi id : DATE: AUG 3, 9 1994 REPLY TO Al-iN OF: EM-421 (W. A. W illiams, 427-1719) r, )' \, ! c ' d, ' t ' 3 ' 2 -L SUBJECT: Elimination of the Sites from the Formerly Utilized Sites Remedial Action Program To' The File In 1990, with the assistance of M r. Doug Tonlsay and Ms. M ichelle Landis, I reviewed a nmber of sites that had formerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recommdations were made to eliminate them from further consideration under Formerly Utilized Sites Remedial Action Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more

453

United States Government  

Office of Legacy Management (LM)

81278 81278 United States Government Department of Energy memorandum - ?71 S.EP 23 F; i: 54 DATE: SEP 1 8 1991 REPLY TO ATTNOF: EM-421 (P. Blom, 3-8148) SUBJECT: Approved Categorical Exclusion for Removal Actions at Elza Gate, Tennessee TO: Lester K. Price, OR Attached is a copy of the approved Categorical Exclusion (CX) for removal of contaminated material at the Elza Gate site in Tennessee. The removal action involves the removal of radioactive contaminated soil and concrete as well as the removal of Polychlorinated Biphenyl (PCB) contaminated soil. This CX was approved by Carol Borgstrom, Office of National Environmental Policy Act Oversight (EH-25), September 9, 1991. Paul F. Blom Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration

454

United States Government  

Office of Legacy Management (LM)

D;F&g,8 C-r-I 3-3 D;F&g,8 C-r-I 3-3 .*. United States Government . memorandum DATE: JUNZO 1994 -... REPLY TO A?TN OF: EM-421 (W. A. Williams, 903-8149) Authority Determination -- Combustion Engineering Site, Windsor, SUBJECT: Connecticut To' The File The attached review, documents the basis for determining whether the Department of Energy (DOE) has authority for taking remedial action at the Combustion Engineering (CE) Site in Windsor, Connecticut, under the Formerly Utilized Sites Remedial Action Program. CE was a prime contractor for the Atomic Energy Commission (AEC) and performed high-enriched uranium fuel fabrication work from 1955 to 1967. The services furnished at the CE site included some experimental work; however, it primarily consisted of fabrication of high-enriched uranium

455

United States Government  

Office of Legacy Management (LM)

DOEF1325.8 P4 0 * 1 - 1 DOEF1325.8 P4 0 * 1 - 1 - Iq \ b- United States Government memorandum pJ .T\ \b Department of Energy DATE: OCT 9 1984 REPLY TO NE-20 All-N OF: .- Authorizations for Actions Under the Formerly Utilized Sites Remedial Action SUBJECT: Program (FUSRAP) at the St. Louis Airport Storage Site, St. Louis, MO. and the W. R. Grace Site at Curtis Bay, Md. To: J. LaGrone, Manager Oak Ridge Operations Office St. Louis Airport Storage Site, MO The House and Senate Reports for the Energy and Water Development Appropriation Act (P.L. 98-360) directed the Department of Energy "...to take the necessary steps to consolidate and dispose of the waste material from the Latty Avenue site and nearby St. Louis Airport vicinity properties locally, by reacquiring, stabilizing, and using the old 21.7

456

United States Government  

Office of Legacy Management (LM)

ooc F r325.8 ooc F r325.8 imo, EFO ,ww United States Government memorandum Department of Energy -fw?w 81ua DATE: FEB 1 5 1991 l+Ks6 sUsJECT: Elimination of the Buflovak Company Site from FUSRAP ho: The File I have reiiewed the attached preliminary site summary and recommendation for the Buflovak Company site in Buffalo, New York. I have determined that there is little likelihood of contamination at this site. Based on the above, the Buflovak Company site is hereby eliminated from further consideration under the Formerly Utilized Sites Remedial Action Program. W. Alexander Williams Designation and Certification Manager Off-Site Branch Division of Eastern Area Programs Office of Environmental Restoration Attachment - I . b e e : W e s to n E M - 4 0 ( 3 ) E M - 4 2 ( 2 ) W illiams r

457

United States Attorney General  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93, 5 U.S. Op. Off. Legal Counsel 1, 1981 WL 30865 (U.S.A.G.) 93, 5 U.S. Op. Off. Legal Counsel 1, 1981 WL 30865 (U.S.A.G.) United States Attorney General ***1 *293 January 16, 1981 **1 The President The White House Washington, D.C. 20500 MY DEAR MR. PRESIDENT: You have asked my opinion concerning the scope of currently existing legal and constitutional authorities for the continuance of government functions during a temporary lapse in appropriations, such as the Government sustained on October 1, 1980. As you know, some initial determination concerning the extent of these authorities had to be made in the waning hours of the last fiscal year in order to avoid extreme administrative confusion that might have arisen from Congress' failure timely to enact 11 of the 13 anticipated regular appropriations bills, FN;B1[FN1]FN;F1 or a

458

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3/02 TUE 08:59 FAX 423 241 3897 OIG *-* HQ 00o2 3/02 TUE 08:59 FAX 423 241 3897 OIG *-* HQ 00o2 DOE F 132,.8 W.I: ((07.9u) United States Government Department of Energy Memorandum DATE: December 2, 2002 REPLY TO REPLY TO -36 (A02SR013) Audit Report No.: OAS-L-03-07 ATTN OF: SUBJECT: Audit of Subcontracting Practices at the Savannah River Site TO: Jeffrey M. Allison, Acting Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Department of Energy (Department) has contracted with Westinghouse Savannah River Company, LLC (Westinghouse) to manage and operate the Savannah River Site (Savannah River) through September 30, 2006. As of August 2, 2002, Westinghouse had 534 open and active service procurements worth $100,000 or more each, with a total value of about $518 million, that it had awarded since October 1996.

459

United States Goverment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6/03 15:37 FAX 301 903 4656 _ CAPITAL REGION * FORS FIVEA 91002/004 6/03 15:37 FAX 301 903 4656 _ CAPITAL REGION * FORS FIVEA 91002/004 DOE-F 1325.8 (68-93) Depament of Energy United States Goverment Department of Energy Memorandum OFFICE OF .NSPECTOR GENERAL DATE: February 26, 2003 REPLY TO ATTN OF: IG-34 (A02CG004) Audit Report No.: OAS-L-03-11 SUBJECT: Audit of the Office of Science Infrastructure Modernization Initiatives TO: Acting Associate Director, Office of Laboratory Operations and Environment, Safety and Health, SC-80 The purpose of this report is to inform you of the results of our audit of the Office of Science's infrastructure modernization initiatives. The audit was performed between May and September 2002 at Departmental Headquarters, Brookhaven National Laboratory, and Argonne National Laboratory. The audit methodology is described in

460

United States Government  

Office of Legacy Management (LM)

. v-w. . v-w. ' ;H; (07.901 United States Government 0' ; Td 2, <.<~ Department of Energy ' m e m o randum DATE: REPLY TO Al-TN OF: EM-421 (W. A. W illiams, 903-8149) SUBJECT: Authorization for Remedial Action at Alba Craft Laboratory in Oxford, Ohio L. Price, OR TO: The former Alba Craft Laboratory site at lo-14 West Rose Avenue, Oxford, Ohio, is designated for remedial action under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Dr. and M rs. Gilbert Pacey, of Oxford, Ohio, own the site. This designation is based on the results of a radiological survey and conclusions from an authority review as noted in the attached Designation Summary. Copies of the radiological survey letter report and the authority review are provided for your information.

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

UNITED STATES GOVERKMENT  

Office of Legacy Management (LM)

Ojice Memornndz~nz 0 Ojice Memornndz~nz 0 UNITED STATES GOVERKMENT By application dated ;!ay 11, 1959, as a~zen:ii:d Hay 25, 1959, the a--T+- I-r-- cant requests that its license SW-33 be amend,ed to authorizt? proced- ures for t>e CCLl-ect conversion of LT6 to '3$ and by applicaticn datzci June 29, 1959, a.3 n:odifizd July 15, 1059, the shipment of uranium rdioxide pellets. Based on our rexiew of the information finished by the applicant, it is hereby determined that the applicant is qualified, by training and experience, to use special nuclear material for the pwpose requested and that the ap@icant's procedures, facilities and equip- ment are adequate to protect health and minimize danger to life and property. It is, therefore, determined that ~NM-33 may be amended to

462

United States Government  

Office of Legacy Management (LM)

ocy F 1325.8 ocy F 1325.8 rcro1 . 6Fo0?-001 w 2 3-q United States Government Department of Energ) ~mc DATE: AUG 3,9 1994 y$Jf EH-421 (W. A. Yllliams, 427-1719) MA. \tQ SUBJECT: _ Elirinrtion of the Sites froa the Formerly Utilized Sites Remedial Action Program TQ The File In 1990, with the assistance of Hr. Doug Tonkay and Hr. Nlchelle Landis, I reviewed a number of sites that had fomerly provided goods and/or services to the Fernald facility as subcontractors. For 24 of.these sites, recomendations were made to eliminate them from further consideration under Forwrly Utilized Sites Remedial A&Ion Program (FUSRAP). In each case, I made or reviewed the evaluation, and, in each case, a handwritten evaluation was prepared. This is to provide a more formal record of the decision on these sites l hd to ratify and confim the

463

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

:)£ F 13 :)£ F 13 ;' 5 H e Etectroou: Form Approved by CGJR - 01120195 (n·/w! United States Government Department of Energy Bonneville Power Administration memorandum DATE: 0 I. 7 20D 9 REPLY TO AnN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum TO : Robert Macy Project Manager - TELF-TPP-3 Proposed Action: Perform routine access road maintenance to the Rockdale Microwave site . Budget Information: Work Order #180709 PP&A Project No.: 1389 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities .. .for structures, rights-of-way, infrastructures such as roads, equipment. .. routine maintenance activities, corrective .... are required to maintain ... infrastructures . ..in a condition suitable for a facility to be used for its designed purpose.

464

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE:F 1325.8 7 DOE:F 1325.8 7 (08-93) United States Government Department of Energy memorandum DATE: April 10, 2006 REPLY TO ATTN OF: IG-32 (A05AL045) Audit Report Number: OAS-L-06-12 SUBJECT: Audit of Sandia National Laboratories' Safeguards and Security Path Forward Management Plan TO: Associate Administrator for Defense Nuclear Security INTRODUCTION AND OBJECTIVE From 2001 to 2003, approximately 500 security-related findings and observations were identified at Sandia National Laboratories (Sandia) by the Department of Energy's Office of Independent Oversight and Performance Assurance (OA), the National Nuclear Security Administration's (NNSA) Sandia Site Office (SSO), and Sandia's self assessments. Sandia senior management acknowledged the significance of the numerous findings and, in

465

United States Government Memorandum  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy United States Government Memorandum DATE: January 26, 2007 Audit Report Number: OAS-L-07-05 REPLY TO ATTN OF: IG-34 (A06GT035) SUBJECT: Report on "The Department of Energy's Implementation of Revised OMB Circular No. A-123" TO: Acting Chief Financial Officer, CF-1 INTRODUCTION AND OBJECTIVE The Office of Management arid Budget's (OMB) revised Circular No. A-123 (Circular) requires Federal agencies to assess the adequacy of their internal controls. Beginning in Fiscal Year (FY) 2006, the Circular requires agencies to strengthen their assessment, documentation and testing of internal controls over financial reporting and prepare an annual assurance statement on the operating effectiveness of those controls. In August 2005, the Department of Energy's

466

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

w w f.b wr w f k--w .^^- - w w f.b wr w f k--w .^^- - - r - T- - * -* p -ldt - f f - - -J -vv- A n JV DOE F 1325.8 (08-93) United States Government ------- Department of Energy memorandum DATE: June 15, 2006 REPLY TO Audit Report Number: OAS-L-06-15 ATTN OF: IG-32 (A05SR029) SUBJECT Audit of "Storage Capacity of the Iligh Level Waste Tanks at the Savannah River TO: Manager, Savannah River Operations Office INTRODUCTION AND OBJECTIVE The Savannah River Site in South Carolina currently stores about 36 million gallons of waste in 49 active underground storag,* .ks. Twenty-two of these .anks do not meet Environmcntal Protection A&-.y (EPA) requirements ybr full secondary containment and must be emptied and closed by 2022 in accordance with a closure schedule approved by the EPA and the 5oith Carolina Department

467

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0/02 WED 09:58 FAX 423 241 3897 OIG 0/02 WED 09:58 FAX 423 241 3897 OIG -.- +-+ HQ ]002 rFG (07-;1) United States Government Department of Energy Memorandum DATE: October 29, 2002 REPLY TO 1G-36 (A02DN028) Audit Report No.: OAS-L-03-01 ATTN OF; SUBJECT: Audit of Procurement at the Rocky Flats Environmental Technology Site TO: Eugene Schmitt, Manager, Rocky Flats Field Office ' INTRODUCTION AND OBJECTIVE The Department of Energy (Department) and its site contractor, Kaiser-Hill Company, LLC (Kaiser-Hill), contracted in January 2000 to close the Rocky Flats Environmental Technology Site (Rocky Flats) by a target date of December'15, 2006. As of May 2002, Kaiser-Hill had awarded 784 procurements worth more than $25,000 each, with a total value of about $368.6 million, to support the complex activities required for site closure.

468

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

uV,./ J.r./ i L .. * i. uV,./ J.r./ i L .. * i. 0 r '± J o ,. NL . Jurt -. rur.mO rI[ V Jg, ]VJUU"/UU4 DOE F 1325.8 (08-93) United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: January 10, 2006 REPLY TO ATTN OF: IG-34 (A06GT029) Audit Report No.: OAS-L-06-06 SUBJECT: Review of the Independent Auditor's Report on The Institute for Genomic Research for the Year Ending December 31, 2004 * TO: Manager, Chicago Office INTRODUCTION AND OBJECTIVE The Institute for Genomic Research (Institute) in Rockville, Maryland is a not-for- profit center that studies areas such as plant, microbial and mammalian genomics. The Institute receives funding from seven Federal agencies to advance its research and development. As required by the Office of Management and Budget (0MB)

469

Combined transmission distribution load flow model employing system reduction and voltage variable load representation  

SciTech Connect

In the few decades since its introduction the digital computer has found widespread application within the electric power industry. One of the more fruitful areas for its utilization has been in the determination of the steady-state voltage conditions throughout the system. A power system naturally breaks down into two very distinct parts: transmission and distribution, and traditionally, the voltage problem has been separated the same way. In the transmission system it is referred to as a load flow problem, and in the distribution part it is called a voltage profile. In addition, the loads are often treated differently. Transmission loads are usually considered to be constant power, and the equations that result are therefore nonlinear. In the distribution portion the loads, though specified in terms of power, are sometimes handled as constant impedances, with linear equations. This work produced a new model wherein a mesh transmission system is combined with a radial distribution system and they are solved simultaneously. A system reduction technique is used to eliminate part of the transmission system from consideration, and thereby keep the problem at a manageable size. The solution algorithm incorporates a voltage variable load model which approximates the behavior of real loads more nearly than the common representations.

Enouen, P.W.

1985-01-01T23:59:59.000Z

470

ALPHA ATTENUATION DUE TO DUST LOADING  

SciTech Connect

Previous studies had been done in order to show the attenuation of alpha particles in filter media. These studies provided an accurate correction for this attenuation, but there had not yet been a study with sufficient results to properly correct for attenuation due to dust loading on the filters. At the Savannah River Site, filter samples are corrected for attenuation due to dust loading at 20%. Depending on the facility the filter comes from and the duration of the sampling period, the proper correction factor may vary. The objective of this study was to determine self-absorption curves for each of three counting instruments. Prior work indicated significant decreases in alpha count rate (as much as 38%) due to dust loading, especially on filters from facilities where sampling takes place over long intervals. The alpha count rate decreased because of a decrease in the energy of the alpha. The study performed resulted in a set of alpha absorption curves for each of three detectors. This study also took into account the affects of the geometry differences in the different counting equipment used.

Dailey, A; Dennis Hadlock, D

2007-08-09T23:59:59.000Z

471

Brighton, United Kingdom: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Brighton, United Kingdom: Energy Resources Brighton, United Kingdom: Energy Resources (Redirected from Brighton, UK) Jump to: navigation, search Name Brighton, United Kingdom Equivalent URI DBpedia GeoNames ID 2654710 Coordinates 50.82838°, -0.13947° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.82838,"lon":-0.13947,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

472

Beijing Transform United New Energy Investment Co Ltd | Open Energy  

Open Energy Info (EERE)

United New Energy Investment Co Ltd United New Energy Investment Co Ltd Jump to: navigation, search Name Beijing Transform United New Energy Investment Co.,Ltd. Place Beijing, China Zip 100005 Product The clean energy investment arm of Beijing Mainstreet Corp. Coordinates 39.90601°, 116.387909° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.90601,"lon":116.387909,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

473

Hourly Energy Emission Factors for Electricity Generation in the United  

Open Energy Info (EERE)

Hourly Energy Emission Factors for Electricity Generation in the United Hourly Energy Emission Factors for Electricity Generation in the United States Dataset Summary Description Emissions from energy use in buildings are usually estimated on an annual basis using annual average multipliers. Using annual numbers provides a reasonable estimation of emissions, but it provides no indication of the temporal nature of the emissions. Therefore, there is no way of understanding the impact on emissions from load shifting and peak shaving technologies such as thermal energy storage, on-site renewable energy, and demand control. This project utilized GridViewTM, an electric grid dispatch software package, to estimate hourly emission factors for all of the eGRID subregions in the continental United States. These factors took into account electricity imports and exports

474

United Kingdom Department for International Development | Open Energy  

Open Energy Info (EERE)

Department for International Development Department for International Development Jump to: navigation, search Logo: United Kingdom Department for International Development Name United Kingdom Department for International Development Address 1 Palace Street Place London, United Kingdom Year founded 1997 Phone number +44 (0) 1355 84 3132 Website http://www.dfid.gov.uk Coordinates 51.4988017°, -0.1417935° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.4988017,"lon":-0.1417935,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

475

United Nations Development Programme (UNDP) | Open Energy Information  

Open Energy Info (EERE)

Development Programme) Development Programme) Jump to: navigation, search Logo: United Nations Development Programme Name United Nations Development Programme Address One United Nations Plaza Place New York, New York Zip 10017 Region Northeast - NY NJ CT PA Area Phone number +1 (212) 906-5000 Coordinates 40.7503981°, -73.9685474° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.7503981,"lon":-73.9685474,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

476

Dubai, United Arab Emirates: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Dubai, United Arab Emirates: Energy Resources Dubai, United Arab Emirates: Energy Resources Jump to: navigation, search Name Dubai, United Arab Emirates Equivalent URI DBpedia GeoNames ID 292223 Coordinates 25.252222°, 55.28° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":25.252222,"lon":55.28,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

477

Abu Dhabi, United Arab Emirates: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Dhabi, United Arab Emirates: Energy Resources Dhabi, United Arab Emirates: Energy Resources Jump to: navigation, search Name Abu Dhabi, United Arab Emirates Equivalent URI DBpedia GeoNames ID 292968 Coordinates 24.46667°, 54.36667° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":24.46667,"lon":54.36667,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

478

Unit Commitment Considering Generation Flexibility and Environmental Constraints  

Science Conference Proceedings (OSTI)

This paper proposes a new framework for power system unit commitment process, which incorporates the generation flexibility requirements and environmental constraints into the existing unit commitment algorithm. The generation flexibility requirements are to address the uncertainties with large amount of intermittent resources as well as with load and traditional generators, which causes real-time balancing requirements to be variable and less predictable. The proposed flexibility requirements include capacity, ramp and ramp duration for both upward and downward balancing reserves. The environmental constraints include emission allowance for fossil fuel-based generators and ecological regulations for hydro power plants. Calculation of emission rates is formulated. Unit commitment under this new framework will be critical to the economic and reliable operation of the power grid and the minimization of its negative environmental impacts, especially when high penetration levels of intermittent resources are being approached, as required by the renewable portfolio standards in many states.

Lu, Shuai; Makarov, Yuri V.; Zhu, Yunhua; Lu, Ning; Prakash Kumar, Nirupama; Chakrabarti, Bhujanga B.

2010-07-31T23:59:59.000Z

479

United Nations Environment Programme (UNEP) | Open Energy Information  

Open Energy Info (EERE)

Environment Programme (UNEP) Environment Programme (UNEP) (Redirected from UNEP) Jump to: navigation, search Logo: United Nations Environment Programme Name United Nations Environment Programme Address United Nations Avenue, Gigiri PO Box 30552, 00100 Place Nairobi, Kenya Phone number (254-20) 7621234 Coordinates -1.23224986037°, 36.815630436° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":-1.23224986037,"lon":36.815630436,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

480

Load controller and method to enhance effective capacity of a photovotaic power supply using a dynamically determined expected peak loading  

DOE Patents (OSTI)

A load controller and method are provided for maximizing effective capacity of a non-controllable, renewable power supply coupled to a variable electrical load also coupled to a conventional power grid. Effective capacity is enhanced by monitoring power output of the renewable supply and loading, and comparing the loading against the power output and a load adjustment threshold determined from an expected peak loading. A value for a load adjustment parameter is calculated by subtracting the renewable supply output and the load adjustment parameter from the current load. This value is then employed to control the variable load in an amount proportional to the value of the load control parameter when the parameter is within a predefined range. By so controlling the load, the effective capacity of the non-controllable, renewable power supply is increased without any attempt at operational feedback control of the renewable supply. The expected peak loading of the variable load can be dynamically determined within a defined time interval with reference to variations in the variable load.

Perez, Richard (Delmar, NY)

2003-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "load tmy3 united" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Definition: Direct Load Control Device | Open Energy Information  

Open Energy Info (EERE)

Load Control Device Load Control Device Jump to: navigation, search Dictionary.png Direct Load Control Device A remotely controllable switch that can turn power to a load or appliance on or off. Such a device could also be used to regulate the amount of power that a load can consume. Direct load control devices can be operated by a utility or third party energy provider to reduce a customer's energy demand at certain times.[1] Related Terms power, load References ↑ https://www.smartgrid.gov/category/technology/direct_load_control_device [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid, Retrieved from "http://en.openei.org/w/index.php?title=Definition:Direct_Load_Control_Device&oldid=502631

482

Minor Actinides Loading Optimization for Proliferation Resistant Fuel Design - BWR  

Science Conference Proceedings (OSTI)

One approach to address the United States Nuclear Power (NP) 2010 program for the advanced light water reactor (LWR) (Gen-III+) intermediate-term spent fuel disposal need is to reduce spent fuel storage volume while enhancing proliferation resistance. One proposed solution includes increasing burnup of the discharged spent fuel and mixing minor actinide (MA) transuranic nuclides (237Np and 241Am) in the high burnup fuel. Thus, we can reduce the spent fuel volume while increasing the proliferation resistance by increasing the isotopic ratio of 238Pu/Pu. For future advanced nuclear systems, MAs are viewed more as a resource to be recycled, and transmuted to less hazardous and possibly more useful forms, rather than simply disposed of as a waste stream in an expensive repository facility. MAs play a much larger part in the design of advanced systems and fuel cycles, not only as additional sources of useful energy, but also as direct contributors to the reactivity control of the systems into which they are incorporated. A typical boiling water reactor (BWR) fuel unit lattice cell model with UO2 fuel pins will be used to investigate the effectiveness of adding MAs (237Np and/or 241Am) to enhance proliferation resistance and improve fuel cycle performance for the intermediate-term goal of future nuclear energy systems. However, adding MAs will increase plutonium production in the discharged spent fuel. In this work, the Monte-Carlo coupling with ORIGEN-2.2 (MCWO) method was used to optimize the MA loading in the UO2 fuel such that the discharged spent fuel demonstrates enhanced proliferation resistance, while minimizing plutonium production. The axial averaged MA transmutation characteristics at different burnup were compared and their impact on neutronics criticality and the ratio of 238Pu/Pu discussed.

G. S. Chang; Hongbin Zhang

2009-09-01T23:59:59.000Z

483

SLUDGE TREATMENT PROJECT COST COMPARISON BETWEEN HYDRAULIC LOADING AND SMALL CANISTER LOADING CONCEPTS  

SciTech Connect

The Sludge Treatment Project (STP) is considering two different concepts for the retrieval, loading, transport and interim storage of the K Basin sludge. The two design concepts under consideration are: (1) Hydraulic Loading Concept - In the hydraulic loading concept, the sludge is retrieved from the Engineered Containers directly into the Sludge Transport and Storage Container (STSC) while located in the STS cask in the modified KW Basin Annex. The sludge is loaded via a series of transfer, settle, decant, and filtration return steps until the STSC sludge transportation limits are met. The STSC is then transported to T Plant and placed in storage arrays in the T Plant canyon cells for interim storage. (2) Small Canister Concept - In the small canister concept, the sludge is transferred from the Engineered Containers (ECs) into a settling vessel. After settling and decanting, the sludge is loaded underwater into small canisters. The small canisters are then transferred to the existing Fuel Transport System (FTS) where they are loaded underwater into the FTS Shielded Transfer Cask (STC). The STC is raised from the basin and placed into the Cask Transfer Overpack (CTO), loaded onto the trailer in the KW Basin Annex for transport to T Plant. At T Plant, the CTO is removed from the transport trailer and placed on the canyon deck. The CTO and STC are opened and the small canisters are removed using the canyon crane and placed into an STSC. The STSC is closed, and placed in storage arrays in the T Plant canyon cells for interim storage. The purpose of the cost estimate is to provide a comparison of the two concepts described.

GEUTHER J; CONRAD EA; RHOADARMER D

2009-08-24T23:59:59.000Z

484

Residential equipment part load curves for use in DOE-2  

SciTech Connect

DOE-2 (DOE2 90) includes several correlation curves that predict the energy use of systems underpart load conditions. DOE-2 simulates systems on an hour-by-hour basis, so the correlations are intended to predict part load energy use (and efficiency) as a function of the part load ratio (PLR) for each hour, where PLR = Hourly Load/Available Capacity. Generally residential and small commercial HVAC equipment meets the load at off-design conditions by cycling on and off. Therefore, the part load correlations must predict the degradation due to this on and off operation over an hourly interval.

Henderson, Hugh; Huang, Y.J.; Parker, D.

1999-02-01T23:59:59.000Z

485

The effect of load parameters on system thermal performance  

SciTech Connect

The effects of load size, load profile and hot water set temperature on system thermal performance are investigated in order to determine the relative importance of these design parameters in sizing a solar water heating system. The WATSUN IV computer program was used to introduce various load sizes, load profiles and set temperatures to a base model. The results indicate that variations in load size have a significant effect on the thermal performance of the system. However, variations in load profile and hot water set temperature seem to have no significant effect on system performance.

Vakili, M.

1984-02-01T23:59:59.000Z

486

Methods for Analyzing Electric Load Shape and its Variability  

Science Conference Proceedings (OSTI)

Current methods of summarizing and analyzing electric load shape are discussed briefly and compared. Simple rules of thumb for graphical display of load shapes are suggested. We propose a set of parameters that quantitatively describe the load shape in many buildings. Using the example of a linear regression model to predict load shape from time and temperature, we show how quantities such as the load?s sensitivity to outdoor temperature, and the effectiveness of demand response (DR), can be quantified. Examples are presented using real building data.

Price, Philip

2010-05-12T23:59:59.000Z

487

On dynamic load balancing on graphics processors  

Science Conference Proceedings (OSTI)

To get maximum performance on the many-core graphics processors it is important to have an even balance of the workload so that all processing units contribute equally to the task at hand. This can be hard to achieve when the cost of a task is not known ...

Daniel Cederman; Philippas Tsigas

2008-06-01T23:59:59.000Z

488

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

uq/Uu.3/uo U-L:i ' rAA OuL a uo oUu. 0tri.l± i m,.i,*, u". run.' r.yrcir V e.u uq/Uu.3/uo U-L:i ' rAA OuL a uo oUu. 0tri.l± i m,.i,*, u". run.' r.yrcir V e.u O000DOE F 1325.8 (08-93) Department of Energy United States Government Department of Energy Memorandum OFFICE OF INSPECTOR GENERAL DATE: March 31,2006 REPLY TO ATTN OF: IG-34 (A05TG028) Audit Report No.: OAS-L-06-10 SUBJECT: Report on Audit of "The Department's Information Technology Capital Planning and Investment Control Process" TO: Chief Information Officer, IM-1 INTRODUCTION AND OBJECTIVE Federal guidance requires that Agencies develop and implement capital planning and investment control (CPIC) processes to help ensure that their major information technology investments achieve intended outcomes, represent the best allocation of resources, and reach strategic goals and objectives. The Department of Energy

489

United States Government  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2/04 THU 14:52 FAX 423 241 3897 OIG -**- HQ l015 2/04 THU 14:52 FAX 423 241 3897 OIG -**- HQ l015 ol: Fi 13 5.8 (8-09) £1*G (in'mi^)) United States Government Department of Energy Memorandum DATE: April. 22, 2004 REPLY TO ATTN OF: T -36 (A04RL018) Audit Report No.: OAS-L-04-15 SUBJECT: Audit of Disposition of Excess Facilities at the Hanford Site TO: Keith A. Klein, Manager, Richland Operations Office INTRODUCTION AND OBJECTIVE The Hanford Site (Hanford) is the largest of the three original defense production sites founded during World War II. Between 1943 and 1963, nine plutonium production reactors were built along the Columbia River and five processing facilities were built on the site's Central Plateau, with about 1,000 support facilities. Currently, Hanford has a total of 1,500 facilities of which an estimated 1,000 are excess to current and future mission

490

United States Goverment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UO/J±0ou4 TcdJ ± O:S'. Aa. ou* o *.I. I 01j ' . UO/J±0ou4 TcdJ ± O:S'. Aa. ou* o *.I. I 01j ' . - - 00E F 1325,8 (08-93) United States Goverment Department of Energy memorandum DATE: August 13, 2007 Audit Report Number: OAS-L-07-19 REPLY TO ATTN OF: IG-32 (A07PR059) SUBJECT: Audit of Executive Compensation at Selected Office of Science Sites TO: Chief Operating, Officer, Office of Science INTRODUCTION AND OBJECTIVE As part of a Department of Energy-wide audit of executive compensation, we reviewed seven Office of Science sites. Specifically, we reviewed executive compensation costs incurred ~,r claim~.- fr- F".*l*- Y. rs 2003, 2 , and 2005 at - Argonne National Laboratory (Argonne), Brookhaven National Laboratory (Brookhaven), Lawrence Berkeley National Laboratory (LBNL), Oak Ridge Institute for Science and Education, Oak Ridge National Laboratory, Princeton Plasma Physics

491

United States Government Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1/03 07:45 FAX 301 903 4656 CAPITAL REGION -* FORS FIVEA I002/004 1/03 07:45 FAX 301 903 4656 CAPITAL REGION -* FORS FIVEA I002/004 DOE F 1325 ' (8-69) EFO (07-90) United States Government Department of Eneray memorandum DATE: PR17 2003 Audit Report No.: OAS-L-03-14 REPLY TO ATTN OF: IG-34 (A03PT040) SUBJECT: Audit of the Office of Energy Efficiency and Renewable Energy's (EE) Grants, Subsidies, and Cost Sharing Arrangements TO: Assistant Secretary for Energy Efficiency and Renewable Energy, EE-1 The purpose of this report is to inform you of the results of our review of the Office of Energy Efficiency and Renewable Energy's (EE) incentive payments and cost-share arrangements. The review was initiated in February 2003, and fieldwork was conducted through April 2003 at Department of Energy (Department) Headquarters. Our methodology is described in the attachment to this report.

492

Solar heating unit  

SciTech Connect

A solar heating unit is disclosed for disposition exteriorly of a building window for heating the air within the space interiorly of the window embodying a casing with a transverse divider for creating a rear passage and a front passage which are in communication in their lower portions. The upper end of the rear passage connects with the forward end of a rearwardly extending lower duct having a cool air inlet at the rearward end thereof. The upper end of the front passage connects with the forward end of an upper duct progressing rearwardly above the lower duct and with there being a warm air outlet at the rearward extremity thereof. A heat exchanger is disposed within the front passage for impingement thereon of solar radiation passing through a transparent panel defining the front of said casing. A thermal responsive closure is provided at the upper end of said front passage for closing same when the temperature within the front passage has descended to a predetermined level.

Grisbrook, R.B.

1978-10-24T23:59:59.000Z

493

Second United Nations  

NLE Websites -- All DOE Office Websites (Extended Search)

i' i' Second United Nations t Jnternational Conference 1 , of Atomic Energy on the Peaceful Uses 4 i \ Confidential until official release during Conference ORIGINAL: ENGLISH METHODS O F PARTICLE DETECTION FOR HIGH-ENERGY PHYSICS EXPERIMENTS t * H. B r a d n e r and D. A. Glaser - INTRODUCTION J 1 % c Recent advances in our knowledge of t h e phenomena of high-energy physics and o'f the e l e m e n t a r y p a r t i c l e s h a s r e s u l t e d f r o m rapid advances in the technology of p a r t i c l e a c c e l e r a t o r s and the art of p a r t i c l e detection. cl'asses: (1) the "track-imaging" device in which one s e e s o r photographs t r a c k s which coincide with the a c t u a l path taken by the p a r t i c l e s , and ( 2 ) counting d e - v i c e s which give only an indication that the p a r t i c l e s p a s s somewhere in the

494

Total U.S. Housing Units.................................  

U.S. Energy Information Administration (EIA) Indexed Site

Housing Units (millions) Single-Family Units Apartments in Buildings With-- Space Heating Usage Indicators Million U.S. Housing Units Detached Attached Energy Information...

495

Maximal Reliability for Unit-weighted Composites  

E-Print Network (OSTI)

Maximal Reliability for Unit-weighted Composites Peter M.Maximal Reliability for Unit-weighted Composites Althoughconsistency coefficient for a unit-weighted composite. The

Peter M. Bentler

2011-01-01T23:59:59.000Z

496

Collaborative Unit Construction in Korean: Pivot Turns  

E-Print Network (OSTI)

A. (1996). Interactional units in conversation: Syntactic,M. (2000). The construction of units in conversational talk.character of grammatical units in conversation: Conditional

Ju, Hee

2011-01-01T23:59:59.000Z

497

Unsuspected Pulmonary Embolism in Observation Unit Patients  

E-Print Network (OSTI)

department observation unit. Emerg Med Clin North Am. 2001;ED) managed acute care unit on ED overcrowding and emergencyof a chest pain observation unit compared with routine care.

Limkakeng, Alexander T.; Glickman, Seth W; Cairns, Charles B; Chandra, Abhinav

2009-01-01T23:59:59.000Z

498

Distribution load study aids system planning  

SciTech Connect

The Walnut Metering Project is an experimental substation and distribution system metering installation designed to provide quantitative data for distribution system planning. The design and operation of the metering equipment are discussed. After 3 years of operation it was concluded that the primary economi