Sample records for line upgrade project

  1. Request for Proposals for New or Upgraded Transmission Line Projects...

    Office of Environmental Management (EM)

    Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 Request for...

  2. Plains & Eastern Clean Line Project Proposal for New or Upgraded...

    Broader source: Energy.gov (indexed) [DOE]

    Page 45 of 53 gas-fired combined-cycle project that interconnected to the Palo Verde Nuclear Generating Station, which served the western grid. This project became commercial...

  3. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  4. Cyclotron Institute Upgrade Project

    SciTech Connect (OSTI)

    Clark, Henry; Yennello, Sherry; Tribble, Robert

    2014-08-26

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  5. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTX Upgrade Project Federal Project Director, SC-PSO Administrative Change Approved by Office, ou=DOE-PSO, email=aindelicato@pppl.gov, c=US Date: 2012.10.15 09:41:43 -04'00' #12;NSTX Upgrade Description of Changes A 1/11/10 PPEP Initial Issue by PPPL & PSO, but not approved by OFES B 4/5/10 PPEP Cost

  6. ISIS Project Upgrade Campus Community

    E-Print Network [OSTI]

    Massachusetts at Lowell, University of

    ISIS Project Upgrade Campus Community Page Navigation Page | 1 Page navigation has changed in the ISIS Application. This document provides you with the new location of all your key Campus Community the Navigation Pagelets": ISIS.UML..EDU #12;

  7. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    _____________________________ Manager, SC-PSO _____________________________ J. Makiel NSTX Upgrade Project Federal Project Director, SC-PSO Description of Changes A 1/11/10 PPEP Initial Issue by PPPL & PSO, but not approved by OFES B 4/5/10 PPEP Cost

  8. Protection Upgrades Project (4580)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference)ProjectProposedAmerica'sTrap and

  9. Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i nAandSummary Areas ofEnergy OnPeter B.EnergyInPilgrim6, 2015Line

  10. Advanced Photon Source Upgrade Project

    ScienceCinema (OSTI)

    Mitchell, John; Gibson, Murray; Young, Linda; Joachimiak, Andrzej

    2013-04-19

    Upgrade to Advanced Photon Source announced by Department Of Energy. Read more: http://go.usa.gov/ivZ

  11. Pacific Direct Current Intertie (PDCI) Upgrade Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  12. Pacific DC Intertie Upgrade Project Status Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    T I O N Pre-Decisional. For Discussion Purposes Only. PDCI Upgrade Project Replace aging Celilo 4 converter terminal with a new 2 converter terminal rated 560kV and 3410A...

  13. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResourcelogo and-E C H2015Tray and|Projects Pages default

  14. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director ..............................................................................................................................1 1.2.1 DOE-approved project documents:..............................................................................................1 1.2.2 DOE certified institutional systems or plans

  15. NSTX Upgrade Project Execution Plan NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    ..............................................................................................................................1 1.2.1 DOE-approved project documents:..............................................................................................1 1.2.2 DOE certified institutional systems or plans.......................................................................................................4 DOE Level I Milestones

  16. Health and Safety Plan for NSTX Upgrade Project Tasks

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Draft 0 6/17/11 1 Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell: _____________________________________________________________ Jerry Levine, Environment, Safety, Health and Security Head Reviewed by describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade Project work

  17. Health and Safety Plan for NSTX Upgrade Project Tasks

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell PRINCETON PLASMA....~_____...L....,L....q..l:::::.......:.J Larry Dudek, NSTX Center Stack Manager Reviewed by: I( Jer evine, Environment, Safety, Health and S This document describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade

  18. RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE

    SciTech Connect (OSTI)

    Tran, Paul

    2013-02-28

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  19. Advanced Photon Source Upgrade Project - Materials

    ScienceCinema (OSTI)

    Gibbson, Murray;

    2013-04-19

    An upgrade to Advanced Photon Source announced by DOE - http://go.usa.gov/ivZ -- will help scientists break through bottlenecks in materials design in order to develop materials with desirable functions.

  20. Advanced Photon Source Upgrade Project - Energy

    ScienceCinema (OSTI)

    Gibson, Murray; Chamberlain, Jeff; Young, Linda

    2013-04-19

    An upgrade to the Advanced Photon Source (announced by DOE - http://go.usa.gov/ivZ) will help scientists better understand complex environments such as in catalytic reactions.

  1. Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE)

    Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

  2. Low emittance upgrade for CANDLE project

    E-Print Network [OSTI]

    Zanyan, G S

    2015-01-01

    To improve the performance of CANDLE synchrotron light source and stay competitive with recently proposed low emittance upgrade programs in the world we have developed new low emittance lattices for CANDLE booster and storage ring. These lattices have been designed taking into account the new developments in magnet fabrication technology and the multi-bend achromat concept. The main design considerations, the linear and non-linear beam dynamics aspects of the modified lattices are presented.

  3. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    0 1,487 1,538,883.45 398,403.27 398,403.27 Job: 7200 - Center Stack Management-DUDEK Subtotal 1,222 02NOV09A 02NOV09A 30SEP14 30SEP14 0 1,487 1,538,883.45 398,403.27 398,403.27 Project Management 7200

  4. Categorical Exclusion 4598: Security Upgrade Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B LReportsDeterminatIonFornl Project Title:

  5. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  6. Project X ICD-2 and its upgrades for Neutrino Factory or Muon Collider

    SciTech Connect (OSTI)

    Lebedev, Valeri; Nagaitsev, Sergei; /Fermilab

    2009-10-01

    This paper reviews the Initial Configuration Document for Fermilab's Project X and considers its possible upgrades for neutrino factory or muon collider.

  7. 12 GeV Upgrade Project - Cryomodule Production

    SciTech Connect (OSTI)

    J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

    2012-07-01

    The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

  8. NSTX Upgrade Project Final Design Review June 22 -24, 2011 1 NSTX Supported by

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    NSTX Upgrade Project ­ Final Design Review June 22 - 24, 2011 1 NSTX Supported by College W Photonics New York U Old Dominion U ORNL PPPL PSI Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Plasma Physics Laboratory NSTX Upgrade Project Final Design Review LSB, B318 June 22-24, 2011 1 Monday

  9. Proposed Project: Plains & Eastern Clean Line Transmission Line...

    Energy Savers [EERE]

    & Eastern Clean Line project (the proposed project) would include an overhead +- 600 kV direct current electric transmission system and associated facilities with the capacity to...

  10. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect (OSTI)

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  11. Montana-to-Washington Transmission System Upgrade Project - M2W

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  12. Conceptual design report for Project W-420, stack monitoring upgrade

    SciTech Connect (OSTI)

    Lott, D.T., Fluor Daniel Hanford

    1997-03-10

    This document provides the Conceptual Design for the upgrade of seven designated Tank Farm stacks to meet NESHAP Title 40, CFR, Part 61, Sub-part H requirements.

  13. Energy and Emissions Savings through Insulation Upgrade Projects 

    E-Print Network [OSTI]

    Lettich, M.

    2008-01-01

    The presentation demonstrates the value of including insulation system assessment, repairs and upgrades on a facility's physical function and its importance in the overall energy and environmental management program. Financial and environmental...

  14. Northern Pass Transmission Line Project Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On...

  15. EA-1937: Pacific Direct Intertie Upgrade Project; Lake, Jefferson, Crook, Deschutes, and Wasco Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared an EA that assesses the potential environmental impacts of a proposal to replace equipment at BPA’s Celilo converter station and upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from The Dalles, Oregon, to the Nevada-Oregon border.

  16. Approval of CD-2 for the National Spherical Torus Experiment (NSTX) Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    of compact and high normalized pressure "spherical torus" (ST) magnetic fusion plasmas. The compact Plasma Physics Laboratory DOE Princeton Site Office (SSO) Office of Science Office of Fusion Energy Selection and Cost Range for the NSTX Upgrade Project was approved by the Associate Director for Fusion

  17. Better Buildings Neighborhood Program Data Upgrade Projects | Department of

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment|Marketing, LLC |Energy Advisor the fish ladderEnergy project

  18. Power Systems Past Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    loop and its six associated substations. An upgrade of the INL loop, designed by Power Systems personnel, was completed in 1997. This project consists of transmission line...

  19. Performance Studies of Micromegas Chambers for the New Small Wheel Upgrade Project

    E-Print Network [OSTI]

    Ntekas, Konstantinos; The ATLAS collaboration

    2015-01-01

    Micromegas, an abbreviation for Micro MEsh Gaseous Structure (MM), is a robust detector with excellent spatial resolution and high rate capability. An $R\\&D$ activity, called Muon ATLAS MicroMegas Activity (MAMMA), was initiated in 2007 in order to explore the potential of the MM technology for use in the ATLAS experiment. After several years of prototyping and testing, the ATLAS collaboration has chosen the MM technology along with the small-strip Thin Gap Chambers (sTGC) for the upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW) upgrade project. It will employ eight layers of MM and eight layers of sTGC detectors per wheel. The NSW project requires fully efficient MM chambers, able to cope with the maximum expected rate of $15\\,\\mathrm{kHz/cm^2}$ featuring single plane spatial resolution better than $100\\,\\mu\\mathrm{m}$. The MM detectors will cover a total active area of $\\sim1200\\,\\mathrm{m^2}$ and will be operated in a moderate magnetic field with intens...

  20. Achievements of the ATLAS Upgrade Planar Pixel Sensors R&D Project

    E-Print Network [OSTI]

    C. Nellist

    2014-11-20

    In the framework of the HL-LHC upgrade, the ATLAS experiment plans to introduce an all-silicon inner tracker to cope with the elevated occupancy. To investigate the suitability of pixel sensors using the proven planar technology for the upgraded tracker, the ATLAS Planar Pixel Sensor R&D Project (PPS) was established comprising 19 institutes and more than 90 scientists. The paper provides an overview of the research and development project and highlights accomplishments, among them: beam test results with planar sensors up to innermost layer fluences (> 10^16 n_eq cm^2); measurements obtained with irradiated thin edgeless n-in-p pixel assemblies; recent studies of the SCP technique to obtain almost active edges by postprocessing already existing sensors based on scribing, cleaving and edge passivation; an update on prototyping efforts for large areas: sensor design improvements and concepts for low-cost hybridisation; comparison between Secondary Ion Mass Spectrometry results and TCAD simulations. Together, these results allow an assessment of the state-of-the-art with respect to radiation-hard position-sensitive tracking detectors suited for the instrumentation of large areas.

  1. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    SciTech Connect (OSTI)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-09-28

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical.

  2. UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefield Municipal Gas &SCE-Sessions | Department of Correctiveof Deliverables UDACSmart GridUNLV DESERTTO

  3. Proposed Southline Transmission Line Project - Volume 4 of 4...

    Office of Environmental Management (EM)

    2 Appendix J J-1 Southline Transmission Line Project Draft Environmental Impact Statement and Draft Resource Management Plan Amendment BLM LAND USE AUTHORIZATIONS 1...

  4. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...

    Energy Savers [EERE]

    Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental...

  5. Section 1222 Program - Proposed Plains & Eastern Clean Line Project...

    Energy Savers [EERE]

    Electricity Policy Coordination and Implementation Transmission Planning Section 1222 of the Energy Policy Act 2005 Proposed Project: Plains & Eastern Clean Line ...

  6. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Environmental Management (EM)

    transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOEEIS-0433-S1). Public Comment Opportunities None available at this...

  7. EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho.  The...

  8. Projective lines over one-dimensional semilocal domains

    E-Print Network [OSTI]

    2013-01-21

    contracts to a maximal ideal in R[y] or in R[y?1] implies that R is Henselian. Moti- vated by this question, we consider the structure of the projective line Proj(R[s, ...

  9. CXD 4601, Line Yard Fence Project (4601)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 OutreachProductswsicloudwsiclouddenDVA N C E D B LReports from the CloudGEGR-N Goods POCTBT |CUD-55 /AllenLine

  10. Line Rebuild, Relocation and Substation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would likeUniverseIMPACTThousand CubicResourcelogo and-E C H2015Tray and|Projects Pages

  11. AN E&E PUBLISHING SERVICE ENERGY EFFICIENCY: Tenn. project to test range of residential upgrades

    E-Print Network [OSTI]

    to 35 years old and ready for upgrades to heating, ventilation and air conditioning systems, which make and the air sealing of the attic," he said. "Once you do that, you spend less on your heating and air was insulated with material packed under the attic floor, above which a cooling unit was located. In the second

  12. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    2012-01-01

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  13. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  14. Request for Proposals for New or Upgraded Transmission Line Projects Under

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterestedReplacement-2-A Wholesale Power RateEnergySection 1222 of the Energy Policy

  15. Plains & Eastern Clean Line Project Proposal for New or Upgraded

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested PartiesBuilding energy codesPhiladelhia GasDepartment ofN O R T H A M E R

  16. Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project: Draft Environmental Assessment

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematicsEnergyInterested Parties - WAPAEnergy6-09.doc Microsoft WordBlends Mid-LevelDomesticB O N N

  17. GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    SciTech Connect (OSTI)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

  18. Canada's heavy oil, bitumen upgrading activity is growing

    SciTech Connect (OSTI)

    Corbett, R.A.

    1989-06-26

    Heavy oil and bitumen upgrading activity in Canada is surging with the recent start-up of two new upgraders and with plans to build others. These new upgraders make use of modern hydrocracking technology. Articles in this special report on upgrading focus on Canada's oil and bitumen reserves, the promising technologies that upgrade them, and present details of some of the current upgrader projects. This article covers the following areas: Canada's heavy oils; Upgrading expands; Upgrading technologies; Test results; Regional upgraders; High-quality light product.

  19. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado.

  20. Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin)

    Broader source: Energy.gov [DOE]

    This page describes application requirements for all projects that involve the installation of an electricity transmission line or substation that also require either a Certificate of Public...

  1. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...

    Energy Savers [EERE]

    No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the...

  2. Description NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    0.00 B 1030 Award Inner (TF) Conductor Material Contract 0 12JAN11A 12JAN11A 100 0.00 B 1035 Award Inner (TF) Conductor Machining contract 0 14SEP11A 14SEP11A 100 0.00 B 1037 Award TF Lead Extensions 0 30AUG11A 30AUG11A 100 0.00 B 1038 Award Friction Stir Weld Contract 0 30AUG11A 30AUG11A 100 0.00 B FY

  3. EIS-0486: Plains & Eastern Clean Line Transmission Project |...

    Broader source: Energy.gov (indexed) [DOE]

    Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the...

  4. Scientific Upgrades at the Oak Ridge National Laboratory High Flux Isotope Reactor

    SciTech Connect (OSTI)

    Selby, Douglas L [ORNL; Jones, Amy [ORNL; Crow, Lowell [ORNL

    2012-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the High Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: (1) larger beam tubes, (2) a new monochromator drum for the HB-1 beam line, (3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, (4) new instruments for the HB-2 beamline, (5) a new monochromator drum for the HB-3 beam line, (6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, (7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, (8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, (9) a number of new instruments for the cold beams including two new SANS instruments, and (10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule.

  5. EIS-0474: Southline Transmission Line Project; Arizona and New...

    Broader source: Energy.gov (indexed) [DOE]

    consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing...

  6. EIS-0106: Great Falls-Conrad Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

  7. LLNL line-item construction projects Master Site Plan

    SciTech Connect (OSTI)

    1996-04-15

    This interim submittal is an updated 1996 overview of the Master Plan based on the 1995 LLNL Site Development Plan, illustrating the future land use considerations, and the locations of proposed facilities as documented through the line item development process and keyed to the summary table. The following components in addition to the line-item proposals remain key elements in the implementation strategy of the Master Plan: personnel migration, revitalization, space reduction, classified core contraction, utility systems, and environmental restoration.

  8. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  9. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  10. EIS-0124: Conrad-Shelby Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

  11. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  12. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Michael Lane

    2010-01-01

    Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

  13. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Michael Lane

    Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

  14. Jefferson Lab's upgraded Free-Electron Laser produces first ligh...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Navy's goals and expectations and we expect no less from the upgraded FEL." The Free-Electron Laser upgrade project is funded by the Department of Defense's Office of...

  15. Energy Efficiency Upgrades

    SciTech Connect (OSTI)

    Roby Williams

    2012-03-29

    The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

  16. Project Title Economic Modeling & Unconventional Gas Resource Appraisal Program Line Tough Gas

    E-Print Network [OSTI]

    Santos, Juan

    support to assess the economic viability of new tough gas plays (tight gas, shale gas, CBM). Project are illustrated using the US shale gas plays as case templates. Discounted cash flow models are applied1 Project Title Economic Modeling & Unconventional Gas Resource Appraisal Program Line Tough Gas

  17. MONODROMY OF CYCLIC COVERINGS OF THE PROJECTIVE LINE

    E-Print Network [OSTI]

    Venkataramana, T. N.

    Re- search, Homi Bhabha Road, Colaba, Mumbai 40005, INDIA. 1 #12;2 T.N.VENKATARAMANA be a non, x, a) C Ã? C Ã? C : yd = n+1 i=1 (x - ai)ki }, and the fibration F C given by the projection map (y = Z/dZ acts on the equation yd = n+1 i=1 (x - ai)ki , by the map g(x, y) gy for g G where G

  18. Calpine geothermal visitor center upgrade project An interactive approach to geothermal outreach and education at The Geysers

    E-Print Network [OSTI]

    Dobson, P.F.

    2014-01-01

    of enhanced geothermal systems (EGS) on the United States inof the Northwest Geysers EGS demon- stration project.hanced Geothermal Systems (EGS), induced seismicity Abstract

  19. Wanapum Dam Advanced Hydro Turbine Upgrade Project: Part 2 - Evaluation of Fish Passage Test Results Using Computational Fluid Dynamics

    SciTech Connect (OSTI)

    Dresser, Thomas J.; Dotson, Curtis L.; Fisher, Richard K.; Graf, Michael J.; Richmond, Marshall C.; Rakowski, Cynthia L.; Carlson, Thomas J.; Mathur, Dilip; Heisey, Paul G.

    2007-10-10

    This paper, the second part of a 2 part paper, discusses the use of Computational Fluid Dynamics (CFD) to gain further insight into the results of fish release testing conducted to evaluate the modifications made to upgrade Unit 8 at Wanapum Dam. Part 1 discusses the testing procedures and fish passage survival. Grant PUD is working with Voith Siemens Hydro (VSH) and the Pacific Northwest National Laboratory (PNNL) of DOE and Normandeau Associates in this evaluation. VSH has prepared the geometry for the CFD analysis corresponding to the four operating conditions tested with Unit 9, and the 5 operating conditions tested with Unit 8. Both VSH and PNNL have conducting CFD simulations of the turbine intakes, stay vanes, wicket gates, turbine blades and draft tube of the units. Primary objectives of the analyses were: • determine estimates of where the inserted fish passed the turbine components • determine the characteristics of the flow field along the paths calculated for pressure, velocity gradients and acceleration associated with fish sized bodies • determine the velocity gradients at the structures where fish to structure interaction is predicted. • correlate the estimated fish location of passage with observed injuries • correlate the calculated pressure and acceleration with the information recorded with the sensor fish • utilize the results of the analysis to further interpret the results of the testing. This paper discusses the results of the CFD analyses made to assist the interpretation of the fish test results.

  20. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    Kelly, D.L.

    1998-03-12

    This SARP Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A performance agreement has been assigned, beginning in FY 1997, to update, revise, and/or cancel 20 percent of the existing onsite SARPS, so that 100 percent are reviewed and within current standards by the completion of the Project Hanford Management Contract (five-year period).

  1. FRN Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of EPAct 2005 - June 10, 2010

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirleyEnergyTher i n cEnergyNaturaldefinesMay 4, 2015, OHAAlvey-FairviewFrontierFOURTHof240

  2. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  3. APS Upgrade: Meetings, Workshops & Reviews | Advanced Photon...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    dynamics across length scales - in real time, in 3-D, in a single experiment. At the heart of the APS Upgrade Project planning process is the development of a robust science...

  4. EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  5. Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

  6. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

  7. Project W-314 sn-634 transfer line a-b to ax-b acceptance for beneficial use

    SciTech Connect (OSTI)

    Warnick, T. L.

    1997-09-29

    Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

  8. The FNAL Injector Upgrade Status

    SciTech Connect (OSTI)

    Tan, C.Y.; Bollinger, D.S.; Duel, K.L.; Karns, P.R.; Lackey, J.R.; Pellico, W.A; Scarpine, V.E.; Tomlin, R.E.; /Fermilab

    2012-05-14

    The new FNAL H{sup -} injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H{sup -} source, low energy beam transport (LEBT), 200 MHz RFQ and medium energy beam transport (MEBT). Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.

  9. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    KELLY, D.L.

    1998-11-18

    This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a revised SARP upgrade schedule based on the most current program needs. A Project Hanford Management Contract (PHMC) Performance Expectation exists to update, revise, and/or cancel seven onsite SARPS during FY 1999. It is the U.S. Department of Energy's desire that 100% of the SARPs (which existed at the beginning of the PHMC Contract) be upgraded, revised, and/or canceled by the end of the five year contract. This plan is a ''living'' document and is used as a management tool.

  10. Safety analysis report for packaging upgrade plan

    SciTech Connect (OSTI)

    Kelly, D.L., Westinghouse Hanford

    1996-12-09

    This Safety Analysis Report for Packaging (SARP) Upgrade Plan reflects a SARP upgrade schedule based on the most current program needs. A performance agreement has been assigned, beginning in FY 1997, to update, revise, and/or cancel 20 percent of the existing onsite SARPS, so that 100 percent are reviewed and within current standards by the completion of the Project Hanford Management Contract (five-year period).

  11. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  12. The Sloan Digital Sky Survey Reverberation Mapping Project: Ensemble Spectroscopic Variability of Quasar Broad Emission Lines

    E-Print Network [OSTI]

    Sun, Mouyuan; Shen, Yue; Brandt, W N; Dawson, Kyle; Denney, Kelly D; Hall, Patrick B; Ho, Luis C; Horne, Keith; Jiang, Linhua; Richards, Gordon T; Schneider, Donald P; Bizyaev, Dmitry; Kinemuchi, Karen; Oravetz, Daniel; Pan, Kaike; Simmons, Audrey

    2015-01-01

    We explore the variability of quasars in the MgII and Hbeta broad emission lines and UV/optical continuum emission using the Sloan Digital Sky Survey Reverberation Mapping project (SDSS-RM). This is the largest spectroscopic study of quasar variability to date: our study includes 29 spectroscopic epochs from SDSS-RM over $6$ months, containing 357 quasars with MgII and 41 quasars with Hbeta . On longer timescales, the study is also supplemented with two-epoch data from SDSS-I/II. The SDSS-I/II data include an additional $2854$ quasars with MgII and 572 quasars with Hbeta. The MgII emission line is significantly variable ($\\Delta f/f$ 10% on 100-day timescales), indicating that it is feasible to use the broad MgII line for reverberation mapping studies. The data also confirm that continuum variability increases with timescale and decreases with luminosity, and the continuum light curves are consistent with a damped random-walk model on rest-frame timescales of $\\gtrsim 5$ days. We compare the emission-line and...

  13. Design and Manufacture of the RF Power Supply and RF Transmission Line for SANAEM Project Prometheus

    E-Print Network [OSTI]

    Turemen, G; Unel, G; Alacakir, A

    2015-01-01

    A 1-5 MeV proton beamline is being built by the Turkish Atomic Energy Authority in collaboration with a number of graduate students from different universities. The most important aspect of the project, is to acquire the design ability and manufacturing capability of all the components locally. SPP will be an accelerator and beam diagnostics test facility and it will also serve the detector development community with its low beam current. This paper discusses the design and construction of the RF power supply and the RF transmission line components such as its waveguide converters and its circulator.

  14. Hydropower Advancement Project (HAP): Audits and Feasibility...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrades Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades 64hapornlsmith.ppt More Documents & Publications 2014...

  15. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  16. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  17. Hydrocarbonaceous material upgrading method

    DOE Patents [OSTI]

    Brecher, Lee E.; Mones, Charles G.; Guffey, Frank D.

    2015-06-02

    A hydrocarbonaceous material upgrading method may involve a novel combination of heating, vaporizing and chemically reacting hydrocarbonaceous feedstock that is substantially unpumpable at pipeline conditions, and condensation of vapors yielded thereby, in order to upgrade that feedstock to a hydrocarbonaceous material condensate that meets crude oil pipeline specification.

  18. NSLS control system upgrade

    SciTech Connect (OSTI)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-12-31

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans.

  19. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    NONE

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  20. The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

    2009-09-01

    The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

  1. The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Fenner, Marsha W; Liolios, Konstantinos; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Kyrpides, Nikos C.

    2007-12-31

    The Genomes On Line Database (GOLD) is a comprehensive resource of information for genome and metagenome projects world-wide. GOLD provides access to complete and ongoing projects and their associated metadata through pre-computed lists and a search page. The database currently incorporates information for more than 2900 sequencing projects, of which 639 have been completed and the data deposited in the public databases. GOLD is constantly expanding to provide metadata information related to the project and the organism and is compliant with the Minimum Information about a Genome Sequence (MIGS) specifications.

  2. Preparation for upgrading western subbituminous coal

    SciTech Connect (OSTI)

    Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

    1990-11-01

    The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

  3. Energy Upgrade California

    Broader source: Energy.gov [DOE]

    The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified...

  4. Modern hydrocracking is the key to upgrading processes

    SciTech Connect (OSTI)

    Corbett, R.A.

    1989-06-26

    Hydrocracking technology is the key to Canada's heavy oil and bitumen upgrading facilities that have recently started or are due to start up during the next few years. The upgrader at Consumers' Cooperative Refineries Ltd. in Regina Sask.; the capacity addition program (CAP) at Syncrude Canada Ltd.'s Fort McMurray, Alta., plant; Husky Oil Operations Ltd.'s Bi-Provincial upgrader to be built near Lloydminster, Sask.; and the OSLO project to be built near Fort McMurray, all rely on this modern technology for primary upgrading. All of the projects are designed to upgrade heavy oil and bitumen extracted from oil sands to a high-quality synthetic crude oil (SCO) that is a blend of high-quality naphtha and gas oil.

  5. COCONUT Deliverable D13 Upgraded State of the Art

    E-Print Network [OSTI]

    Schichl, Hermann

    COCONUT Deliverable D13 Upgraded State of the Art Techniques Implemented as Modules July 29, 2003.g., useful in the COCONUT project for organizing points, where some of the properties change from work node

  6. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  7. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  8. Announcement of Change in Public Meeting Location for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department announces a change of location for the September 26, 2013 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. The meeting will be from 5 to 8 p.m.

  9. OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project

    Broader source: Energy.gov [DOE]

    On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

  10. Beam intensity upgrade at Fermilab

    SciTech Connect (OSTI)

    Marchionni, A.; /Fermilab

    2006-07-01

    The performance of the Fermilab proton accelerator complex is reviewed. The coming into operation of the NuMI neutrino line and the implementation of slip-stacking to increase the anti-proton production rate has pushed the total beam intensity in the Main Injector up to {approx} 3 x 10{sup 13} protons/pulse. A maximum beam power of 270 kW has been delivered on the NuMI target during the first year of operation. A plan is in place to increase it to 350 kW, in parallel with the operation of the Collider program. As more machines of the Fermilab complex become available with the termination of the Collider operation, a set of upgrades are being planned to reach first 700 kW and then 1.2 MW by reducing the Main Injector cycle time and by implementing proton stacking.

  11. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, Eugene T. (East Moriches, NY); Lin, Mow S. (Rocky Point, NY)

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

  12. Biochemical upgrading of oils

    DOE Patents [OSTI]

    Premuzic, E.T.; Lin, M.S.

    1999-01-12

    A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

  13. ISIS upgrades David Findlay

    E-Print Network [OSTI]

    McDonald, Kirk

    ISIS upgrades David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC Proton Accelerators for Science and Innovation, 12­14 January 2012, FNAL #12;2 ISIS World for research in the physical and life sciences National and international community of >2000 scientists -- ISIS

  14. Energy Efficiency Through Lighting Upgrades

    SciTech Connect (OSTI)

    Kara Berst; Maria Howeth

    2010-06-01

    Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year�¢����s average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

  15. Superconducting RF Lab Facility Upgrades at Los Alamos

    SciTech Connect (OSTI)

    Katonak, D.J.; Rusnak, B.

    1999-03-01

    Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

  16. Testing of FMI's Coal Upgrading Process

    SciTech Connect (OSTI)

    Vijay Sethi

    2009-03-21

    WRI and FMI have collaborated to develop and test a novel coal upgrading technology. Proprietary coal upgrading technology is a fluidized bed-based continuous process which allows high through-puts, reducing the coal processing costs. Processing is carried out under controlled oxidizing conditions at mild enough conditions that compared to other coal upgrading technologies; the produced water is not as difficult to treat. All the energy required for coal drying and upgrading is derived from the coal itself. Under the auspices of the Jointly Sponsored Research Program, Cooperative Agreement DE-FC26-98FT40323, a nominal 400 lbs/hour PDU was constructed and operated. Over the course of this project, several low-rank coals were successfully tested in the PDU. In all cases, a higher Btu, low moisture content, stable product was produced and subsequently analyzed. Stack emissions were monitored and produced water samples were analyzed. Product stability was established by performing moisture readsorption testing. Product pyrophobicity was demonstrated by instrumenting a coal pile.

  17. CRYOGENICS IN BEPCII UPGRADE.

    SciTech Connect (OSTI)

    JIA,L.; WANG,L.; LI,S.

    2002-07-22

    THIS PAPER PRESENTS A CRYOGENIC DESIGN FOR UPGRADING THE BEIJING ELECTRON POSITRON COLLIDER AT THE INSTITUTE OF HIGH ENERGY PHYSICS IN BEIJING. THE UPGRADE INVOLVES 3 NEW SUPERCONDUCTING FACILITIES, THE INTERACTION REGION QUADRUPOLE MAGNETS, THE DETECTOR SOLENOID MAGNETS AND THE SRF CAVITIES. FOR COOLING OF THESE DEVICES, A NEW CRYPLANT WITH A TOTAL CAPACITY OF 1.0KW AT 4.5K IS TO BE BUILT AT IHEP. AN INTEGRATED CRYOGENIC DESIGN TO FIT THE BEPCII CRYOGENIC LOADS WITH HIGH EFFICIENCY IS CARRIEDOUT USING COMPUTATIONAL PROCESS ANALYSIS SOFTWARE WITH THE EMPHASES ON ECONOMICS AND SAFETY IN BOTH CONSTRUCTION AND OPERATION OF THE PLANT. THIS PAPER DESCRIBES THE CRYOGENIC CHARACTERISTICS OF EACH SUPERCONDUCTING DEVICE, THEIR COOLING SCHEMES AND THE OVERALL CRYOPLANT.

  18. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  19. SLHC, the High-Luminosity Upgrade (public event)

    ScienceCinema (OSTI)

    None

    2011-10-06

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  20. EIS-0332: McNary-John Day Transmission Line Project, OR

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

  1. EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western’s transmission system.

  2. Environmental Assessment and Finding of No Significant Impact: Wastewater Treatment Capability Upgrade, Project NO. 96-D-122 Pantex Plant Amarillo, Texas

    SciTech Connect (OSTI)

    N /A

    1999-05-27

    This Environmental Assessment (EA) addresses the U.S. Department of Energy (DOE) proposed action regarding an upgrade of the Pantex Plant Wastewater Treatment Facility (WWTF). Potential environmental consequences associated with the proposed action and alternative actions are provided. DOE proposes to design, build, and operate a new WWTF, consistent with the requirements of Title 30 of the Texas Administrative Code (TAC), Chapter 317, ''Design Criteria for Sewage Systems,'' capable of supporting current and future wastewater treatment requirements of the Plant. Wastewater treatment at Pantex must provide sufficient operational flexibility to meet Pantex Plant's anticipated future needs, including potential Plant mission changes, alternative effluent uses, and wastewater discharge permit requirements. Treated wastewater effluent and non-regulated water maybe used for irrigation on DOE-owned agricultural land. Five factors support the need for DOE action: (1) The current WWTF operation has the potential for inconsistent permit compliance. (2) The existing WWTF lies completely within the 100-year floodplain. (3) The Pantex Plant mission has the potential to change, requiring infrastructure changes to the facility. (4) The life expectancy of the existing facility would be nearing its end by the time a new facility is constructed. (5) The treated wastewater effluent and non-regulated water would have a beneficial agricultural use through irrigation. Evaluation during the internal scoping led to the conclusion that the following factors are present and of concern at the proposed action site on Pantex Plant: (1) Periodic wastewater effluent permit exceedances; (2) Wetlands protection and floodplain management; (3) Capability of the existing facility to meet anticipated future needs of Pantex (4) Existing facility design life; and (5) Use of treated wastewater effluent and non-regulated water for irrigation. Evaluation during the internal scoping led to the conclusion that the following conditions are not present, nor of concern at the proposed site on Pantex Plant, and no further analysis was conducted: (1) State or national parks, forests, or other conservation areas; (2) Wild and scenic rivers; (3) Natural resources, such as timber, range, soils, minerals; (4) Properties of historic, archeological, or architectural significance; (5) Native American concerns; (6) Minority and low-income populations; and (7) Prime or unique farmland. In this document, DOE describes the proposed action and a reasonable range of alternatives to the proposed action, including the ''No-Action'' alternative. The proposed action cited in the ''U.S. Department of Energy Application for a Texas Pollutant Discharge Elimination System Permit Modifying Permit to Dispose of Waste, No. 02296,'' December 1998, included the construction of a new wastewater treatment facility, a new irrigation storage pond, and the conversion of the current wastewater treatment facility into an irrigation storage pond. Although a permit modification application has been filed, if a decision on this EA necessitates it, an amendment to the permit application would be made. The permit application would be required for any of the alternatives and the filing does not preclude or predetermine selection of an alternative considered by this EA. This permit change would allow Pantex to land-dispose treated wastewater by irrigating agricultural land. This construction for the proposed action would include designing two new lagoons for wastewater treatment. One of the lagoons could function as a facultative lagoon for treatment of wastewater. The second lagoon would serve as an irrigation storage impoundment (storage pond), with the alternative use as a facultative lagoon if the first lagoon is out of service for any reason. The new facultative lagoon and irrigation water storage pond would be sited outside of the 100-year flood plain. The existing WWTF lagoon would be used as a storage pond for treated wastewater effluent for irrigation water, as needed. The two new lagoons would be li

  3. EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California

    Broader source: Energy.gov [DOE]

    The Department of the Interior’s Bureau of Indian Affairs considered preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency. This project has been canceled.

  4. Common Industrial Lighting Upgrade Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is used to regulate the ongoing electricity provided to the lamp. COMMON INDUSTRIAL LIGHTING UPGRADE TECHNOLOGIES Due to the phase-out of the incandescent bulb and magnetic...

  5. Upgraded Coal Interest Group

    SciTech Connect (OSTI)

    Evan Hughes

    2009-01-08

    The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

  6. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  7. EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

  8. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  9. Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Preliminary 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2004-01-01

    Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Preliminary M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp Texas Water... stakeholders and the public. This is anticipated to occur sometime in mid 2004. TR-248 January 2004 Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main...

  10. Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Final 

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    2004-01-01

    Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Final M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp Texas Water Resources... April 2004 Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Final M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C...

  11. Upgrading scientific capabilities at the High Flux Isotope Reactor

    SciTech Connect (OSTI)

    West, C.D.; Farrar, M.B.

    1997-07-14

    Following termination of the Advanced Neutron Source (ANS) Project, a program of upgrades to the Department of Energy`s High Flux Isotope Reactor (HFIR) was devised by a team of researchers and reactor operators and has been proposed to the department. HFIR is a multipurpose research reactor, commissioned in 1965, with missions in four nationally important areas: isotope production, especially transuranic isotopes; neutron scattering; neutron activation analysis; and irradiation testing of materials. For neutron scattering, there are two major enhancements and several smaller ones. The first is the installation of a small, hydrogen cold neutron source in one of the four existing beam tubes: because of the high reactor power, and the use of new design concepts developed for ANS, the cold source will be as bright as, or brighter than, the Institute Laue Langevin liquid deuterium vertical cold source, although space limitations mean that there will be far fewer cold beams and instruments at HFIR. This project is underway, and the cold source is expected to come on line following an extended shutdown in 1999 to replace the reactor`s beryllium reflector. The second major change proposed would put five thermal neutron guides at an existing beam port and construct a new guide hall to accommodate instruments on these very intense beams.

  12. A Representation of Projective Space by the Points of a Line

    E-Print Network [OSTI]

    Hess, George Wellman

    1911-05-01

    and AN an ordinary spatial point with "N for its first {"second, third) component, the spatial plane a n determined by l n and A n is a apfifiial s e a i i a l c l a n s Q I tos I, C l a s s I (II/IJD^QB IS* which is denoted a of li ( I 2 > l 3 ) . The ideal line... not all of which are ideal, and X and Y are any two points on AB and AC respectively, there is one, and only one, spatial point collinear with X and Y and with B and C. Case I. A,B,and C are all ordinary. Let the lines AB, AC, BC, and XY be denoted lx...

  13. D0 Silicon Upgrade: Upgrade Piping Loads on Cleanroom Roof

    SciTech Connect (OSTI)

    Sakla, Steve; /Fermilab

    1995-08-28

    The proposed piping layout for the DO upgrade will run along the south wall of DAB. The cryogenic service pipe runs above the upper and lower cleanroom roofs and will need to be supported by the roofs beams. Calculations were done to determine the stresses in the I-beams created by the existing and additional loads due to the upgrade. Refer to drawing no. 3823.115-ME-317283 for drawings of the piping layout. Figure 1 shows the 'plan view' portion of this drawing. The weight of the individual lines were calculated in figure 2 assuming a pipe density of O.28 lbm/in{sup 3} for stainless steel (0.12% C) and a fluid density (assuming LN2 at 1 atm) of 0.03 lbm/in{sup 3}. The weights of the corrugated steel flooring, assembly hall feed cans, support beams, and roof hatch were also included in the analysis. These loads are calculated on pgs. 5-6. A floor load of 50 lbf/ft{sup 2} was also added in order to maintain the existing floor load limit in addition to the added piping loads. Measurements of the dimensions of the I-beams determined that the nominal sizes of the beams were W8 x 21 for the lower roof and W14 x 26 for the upper roof. Pipe lengths were determined from the drawing for each of the lines on pgs. 1-2 of the calculations (refer to all piping by line numbers according to figure 2). A total weight was calculated for lines 3-9 along the south wall and lines 1-2 running along the north wall of the lower cleanroom roof. To simplify the calculations these weights were assumed to be evenly distributed on the 5 I-beam supports of the lower cleanroom roof 2.5 feet in from the south wall. The stress analysis was done using FrameMac, a 2-D finite element program for the Macintosh. Beam 3 was not included in the analysis because it is structurally equivalent to beam 1. The program outputted maximum values for shear stress, bending stress, shear force, and moments in each of the beams analyzed. These values were then compared to the allowable stresses as per the specifications and codes stated in the AISC: Manual of Steel Construction. The stresses on the roof beams needed to be determined in a number of different places. The first was in the beam itself which included the flange and web sections. The second place was at the ends of the beams where the flanges were removed to make the perpendicular connections to the other beams on the lower roof. The final point was the framed beam connection which included the bolt analysis. FrameMac calculated stresses only for the beams which included the sections where the flanges were removed to make the end connections. To analyze the connections, the allowable bending and shear stresses were solved for allowable shear and moments. This was done because FrameMac does not have the capability to analyze the dimensions for the bolts and angles used in the connections were known and the program outputted values for reaction forces and moments at the ends of the beams. Multiplying the allowable shear stress for the bolts and angle connections by their respective areas gave the allowable shear force. The allowable moment for the angle connection was calculated by multiplying the section modulus of the angle by the allowable bending stress. These allowable loads are calculated on pgs. 7-8. The allowable and maximum calculated stresses by FrameMac are summarized in a table. In conclusion, the cleanroom roofs will be able to safely support the weight of the upgrade cryogenic piping, feed cans, corrugated flooring and a 50 lbf/ft{sup 2} floor load with the addition of diagonal braces at the ends of beams 1,2,3,4, and 8. The location and size of these diagonal braces are shown in fig. 4. Also, the piping supports and feed cans will all need to be placed directly above the I-beam supports. These supports will consist of unistrut structures that will be detailed and specified separate to this analysis. The output and input data from FrameMac and the drawings used in the analysis follow the calculation pages.

  14. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades Better Buildings Residential Network Peer Exchange Call Series: Generating Demand for...

  15. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades Better Buildings Residential Network Peer Exchange Call Series: Generating...

  16. Webinar: "Upgrading Renewable and Sustainable Carbohydrates for...

    Energy Savers [EERE]

    "Upgrading Renewable and Sustainable Carbohydrates for the Production of High Energy Density Fuels" Webinar: "Upgrading Renewable and Sustainable Carbohydrates for the Production...

  17. Energy Efficiency Upgrades Help Build Better Neighborhoods |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the...

  18. Generating Demand for Multifamily Building Upgrades | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Generating Demand for Multifamily Building Upgrades Generating Demand for Multifamily Building Upgrades May 14, 2015 12:30PM to 2:00PM EDT Learn more...

  19. Sponsored by: National Association of Energy Service Companies Financing An Energy Upgrade

    E-Print Network [OSTI]

    Sponsored by: National Association of Energy Service Companies Financing An Energy Upgrade. Fortunately, the ability to finance energy projects using outside funding has increased over the past decade. Louis. A decade ago, not many traditional financial institutions really wanted to finance energy upgrade

  20. Esprit Project 20716 Generic Upgradable Architecture

    E-Print Network [OSTI]

    Firenze, Università degli Studi di

    - Pisa Dependable Computing Centre Consorzio Pisa Ricerche Analytical Modelling and Evaluation del CNR, Via S. Maria 36, 56126 Pisa, Italy a.bondavalli@cnuce.cnr.it ** Dept. Information Engineering, University of Pisa, Via Diotisalvi 2, Pisa, Italy mura@iet.unipi.it *** PDCC - Consorzio Pisa Ricerche

  1. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    -NBI-Control & Instm 5 08JUN10A 08JUN10A 14JUN10A 14JUN10A 0 0.00 100 0.00 0.00 2475-0004 FMEA Analysis

  2. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    01JUN10A 0 0.00 100 0.00 0.00 1000-0008 Fault, FMEA evaluation and analyses 21 03MAY10A 03MAY10A 0110A 25FEB11 18MAY11 -58 147 18,651.56 75 13,823.15 18,430.86 1000-0017 Fault, FMEA analyses (LOE) 220

  3. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    , bellows and organ pipes; the fabrication of Center Stack support legs; the procurementJAN14 06JAN14 0 51 904,627.54 139,894.87 167,190.11 1307-1010 Complete CAD Detail & Assy Drawings & Assy Drawings (Final) 48* 01FEB11* 31MAR11A 07APR11 07JUN11 -42 126 29,478.76 50 14,739.38 29

  4. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    (top and bottom) 6 04JAN13 04JAN13 11JAN13 11JAN13 0 161 40,466.88 0.00 0.00 8250-113 Support lower support structure 4 14JAN13 14JAN13 17JAN13 17JAN13 0 161 26,977.92 0.00 0.00 8250-117 lift old pedestal 5 22JAN13 22JAN13 28JAN13 28JAN13 0 212 20,392.80 0.00 0.00 8250-122 Purchase passive plate bolts

  5. Work Authorization Document NSTX Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    element includes refurbishment of a TFTR NBI and its relocation to the NSTX test cell. Included in this WBS element are the activities necessary to refurbish a TFTR Neutral Beam beamline for use on NSTX. This scope includes replacing copper impinged parts as required and refurbishment of the seals, thermocouple

  6. Better Buildings Neighborhood Program Data Upgrade Projects ...

    Energy Savers [EERE]

    Fact 859 February 9, 2015 Excess Supply is the Most Recent Event to Affect Crude Oil Prices - Dataset Fact 889: September 7, 2015 Average Diesel Price Lower than Gasoline for...

  7. Critical Nuclear Utilities Upgrade Project (CNUUP) (4572)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration would like submit theCovalent Bonding in Actinide SandwichCray era Craycourse-inventoryCritical

  8. Cyclotron Institute Upgrade Project - Facilities - Cyclotron Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of NaturalDukeWakefieldSulfateSciTechtail.Theory of raregovAboutRecoveryplanningCoalSocialFrameworksNOW TAKING APPLICATIONS

  9. The hybrid reactor project based on the straight field line mirror concept

    SciTech Connect (OSTI)

    Agren, O.; Noack, K.; Moiseenko, V. E.; Hagnestal, A.; Kaellne, J.; Anglart, H. [Uppsala University, Angstroem Laboratory, Uppsala University, Box 534, SE-751 21 Uppsala (Sweden); Institute of Plasma Physics, National Science Center 'Kharkiv Institute of Physics and Technology', 61108 Kharkiv (Ukraine); Uppsala University, Angstroem Laboratory, Uppsala University, Box 534, SE-751 21 Uppsala (Sweden); Royal Institute of Technology, Nuclear Reactor Technology, SE 100 44 Stockholm (Sweden)

    2012-06-19

    The straight field line mirror (SFLM) concept is aiming towards a steady-state compact fusion neutron source. Besides the possibility for steady state operation for a year or more, the geometry is chosen to avoid high loads on materials and plasma facing components. A comparatively small fusion hybrid device with 'semi-poor' plasma confinement (with a low fusion Q factor) may be developed for industrial transmutation and energy production from spent nuclear fuel. This opportunity arises from a large fission to fusion energy multiplication ratio, Q{sub r} = P{sub fis}/P{sub fus}>>1. The upper bound on Q{sub r} is primarily determined by geometry and reactor safety. For the SFLM, the upper bound is Q{sub r} Almost-Equal-To 150, corresponding to a neutron multiplicity of k{sub eff}=0.97. Power production in a mirror hybrid is predicted for a substantially lower electron temperature than the requirement T{sub e} Almost-Equal-To 10 keV for a fusion reactor. Power production in the SFLM seems possible with Q Almost-Equal-To 0.15, which is 10 times lower than typically anticipated for hybrids (and 100 times smaller than required for a fusion reactor). This relaxes plasma confinement demands, and broadens the range for use of plasmas with supra-thermal ions in hybrid reactors. The SFLM concept is based on a mirror machine stabilized by qudrupolar magnetic fields and large expander tanks beyond the confinement region. The purpose of the expander tanks is to distribute axial plasma loss flow over a sufficiently large area so that the receiving plates can withstand the heat. Plasma stability is not relying on a plasma flow into the expander regions. With a suppressed plasma flow into the expander tanks, a possibility arise for higher electron temperature. A brief presentation will be given on basic theory for the SFLM with plasma stability and electron temperature issues, RF heating computations with sloshing ion formation, neutron transport computations with reactor safety margins and material load estimates, magnetic coil designs as well as a discussion on the implications of the geometry for possible diagnostics. Reactor safety issues are addressed and a vertical orientation of the device could assist passive coolant circulation. Specific attention is put to a device with a 25 m long confinement region and 40 cm plasma radius in the mid-plane. In an optimal case (k{sub eff}= 0.97) with a fusion power of only 10 MW, such a device may be capable of producing a power of 1.5 GW{sub th}.

  10. Using QECBs for Street Lighting Upgrades: Lighting the Way to Lower Energy Bills in San Diego

    Broader source: Energy.gov [DOE]

    Summarizes how the City of San Diego leveraged $13.1 million in qualified energy conservation bonds to increase the size of a street lighting upgrade project. Author: Lawrence Berkeley National Laboratory

  11. IPNS upgrade: A feasibility study

    SciTech Connect (OSTI)

    1995-04-01

    Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

  12. Operational Status and Power Upgrade Prospects of the Neutrino Experimental Facility at J-PARC

    E-Print Network [OSTI]

    Taku Ishida; for the T2K Beam Group

    2015-03-08

    In order to explore CP asymmetry in the lepton sector, a power upgrade to the neutrino experimental facility at J-PARC is a key requirement for both the Tokai to Kamioka (T2K) long-baseline neutrino oscillation experiment and a future project with Hyper-Kamiokande. Based on five years of operational experience, the facility has achieved stable operation with 230 kW beam power without significant problems on the beam-line apparatus. After successful maintenance works in 2013-2014 to replace all electromagnetic horns and a production target, the facility is now ready to accomodate a 750-kW-rated beam. Also, the possibility of achieving a few to multi-MW beam operation is discussed in detail.

  13. IMPEE PhD Opportunity Project title: LightFoot PhD A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal

    E-Print Network [OSTI]

    Greenaway, Alan

    IMPEE PhD Opportunity Project title: LightFoot PhD ­ A PhD Investigation Lightning Protection of HV.swingler@hw.ac.uk Abstract LightFoot PhD ­ A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal Tower Footing Resistance funded by SSE. The LightFoot PhD project takes a fresh approach at adding

  14. LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES | Department...

    Energy Savers [EERE]

    LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES Faced with the challenge of...

  15. Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time,...

  16. Status of TMX upgrade diagnostics construction

    SciTech Connect (OSTI)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-07-20

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan.

  17. Current Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    A FeedbackShare Page 12 GeV Upgrade Project Link to Website External link Technology Engineering Development Facility Project .pdf file (29KB) Utilities Infrastructure...

  18. EFITviewer UpgradesEFITviewer Upgrades MDSplus Event Management System

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Summation System. red values indicate an alarm condition. #12;Web Tool Upgrades · Different Signals may is automatic · Signal names saved in a file may be pasted into Web Tool fields · "Memory" of previous entries improved #12;#12;#12;Web Tools can overlay profiles #12;

  19. CEBAF Upgrade: Cryomodule Performance And Lessons Learned

    SciTech Connect (OSTI)

    Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

    2014-02-01

    The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

  20. Automatic Software Upgrades for Distributed Systems

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-11-30

    Upgrading the software of long-lived, highly-available distributed systems is difficult. It is not possible to upgrade all the nodes in a system at once, since some nodes may be unavailable and halting the system for an ...

  1. Automatic Software Upgrades for Distributed Systems

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-10-06

    Upgrading the software of long-lived, highly-available distributedsystems is difficult. It is not possible to upgrade all the nodes in asystem at once, since some nodes may be unavailable and halting thesystem for an ...

  2. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  3. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Control, Standardization of Upgrades, and Workforce Expectations Quality Control, Standardization of Upgrades, and Workforce Expectations Better Buildings Residential...

  4. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Upgrading More Documents & Publications Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Pathways for Algal Biofuels Bioenergy Technologies Office...

  5. The TCS Upgrade Impurity Control

    E-Print Network [OSTI]

    Washington at Seattle, University of

    field ne is the plasma density RMF is the RMF rotation frequency rs is the FRC's separatrix radius, A.Tankut, G.C. Vlases Redmond Plasma Physics Laboratory, University of Washington RPPL, University of the TCS upgrade #12;FRCs at RPPL · FRC's have potential to make near ideal reactor - linear, high beta

  6. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  7. Project Title: Vault Type Room Upgrade Project (4543)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass mapSpeedingProgramExemptions |(Conference) |l)etermlnationlJetermlnatIont'orn1

  8. Recent Upgrade of the Klystron Modulator at SLAC

    SciTech Connect (OSTI)

    Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

    2011-11-04

    The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

  9. UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2004-01-01

    The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

  10. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 230-kV transmission line in Washington State. BPA’s proposed action is to interconnect the proposed transmission line to an existing BPA substation.

  11. The Use and Benefits of Video Inspection in Lined and Unlined Ductwork in IAQ Surveys and "Source Removal" Cleaning Projects 

    E-Print Network [OSTI]

    Kiec, T. M.

    1992-01-01

    New technology has developed video equipment capable of inspecting interior lined and unlined ductwork. Where IAQ (Indoor Air Quality) questions require inspections of suspicious air conveyance systems. Video recordings provide useful information...

  12. A development of the Geographical Information Projects Index in line with the Scottish Geographic Information Strategy: “One Scotland One Geography.” 

    E-Print Network [OSTI]

    Bruce, David

    2008-12-04

    . The purpose of this project was to review and enhance a prototype Geographical Information Projects Registry (GIPR) to create a self-sustaining user-driven service. The resource exists as a database driven website which is accessed via the World Wide Web (WWW...

  13. Kansas Advanced Semiconductor Project

    SciTech Connect (OSTI)

    Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

    2007-09-21

    KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

  14. Plains and Eastern Clean Line Transmission Line: Federal Register...

    Energy Savers [EERE]

    Clean Line project. The project would include an overhead 600-kilovolt (kv) high voltage, direct current electric transmission system and associated facilities with the capacity to...

  15. Superbend upgrade of the Advanced Light Source

    SciTech Connect (OSTI)

    Robin, D.; Krupnick, J.; Schlueter, R.; Steier, C.; Marks, S.; Wang, B.; Zbasnik, J.; Benjegerdes, R.; Biocca, A.; Bish, P.; Brown, W.; Byrne, W.; Chen, J.; Decking, W.; DeVries, J.; DeMarco, W.R.; Fahmie, M.; Geyer, A.; Harkins, J.; Henderson, T.; Hinkson, J.; Hoyer, E.; Hull, D.; Jacobson, S.; McDonald, J.; Molinari, P.; Mueller, R.; Nadolski, L.; Nishimura, H.; Nishimura, K.; Ottens, F.; Paterson, J.A.; Pipersky, P.; Portmann, G.; Richie, A.; Rossi, S.; Salvant, B.; Scarvie, T.; Schmidt,A.; Spring, J.; Taylor, C.; Thur, W.; Timossi, C.; Wandesforde, A.

    2004-05-26

    The Advanced Light Source (ALS) is a third generation synchrotron light source located at Lawrence Berkeley National Laboratory (LBNL). There was an increasing demand at the ALS for additional high brightness hard x-ray beamlines in the 7 to 40 keV range. In response to that demand, the ALS storage ring was modified in August 2001. Three 1.3 Tesla normal conducting bending magnets were removed and replaced with three 5 Tesla superconducting magnets (Superbends). The radiation produced by these Superbends is an order of magnitude higher in photon brightness and flux at 12 keV than that of the 1.3 Tesla bends, making them excellent sources of hard x-rays for protein crystallography and other hard x-ray applications. At the same time the Superbends did not compromise the performance of the facility in the VUV and soft x-ray regions of the spectrum. The Superbends will eventually feed 12 new beamlines greatly enhancing the facility's capability and capacity in the hard x-ray region. The Superbend project is the biggest upgrade to the ALS storage ring since it was commissioned in 1993. In this paper we present an overview of the Superbend project, its challenges and the resulting impact on the ALS.

  16. MICHIGAN SWEEPS NEIGHBORHOODS WITH ENERGY UPGRADES | Department...

    Energy Savers [EERE]

    on supporting local businesses and employment. BetterBuildings for Michigan developed a sustainable market for energy efficiency upgrades and thousands of qualified professionals...

  17. Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop

    SciTech Connect (OSTI)

    Galarowicz, James

    2014-01-06

    In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project team’s work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASC’s Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

  18. Physics Motivation for NSTXPhysics Motivation for NSTX UpgradeUpgrade Jon Menard and Masa Ono

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Physics Motivation for NSTXPhysics Motivation for NSTX UpgradeUpgrade Jon Menard and Masa Ono NSTX CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep U Quebec #12;NSTXNSTX Physics Motivation ARIES-ST #12;NSTXNSTX Physics Motivation for NSTX Upgrade 3Fall 2009 NSTX Research Priorities: · Full

  19. Physics design of the NSTX UpgradePhysics design of the NSTX Upgrade Jon Menard, PPPL

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    engineering design of the upgrade, systematic free-boundary equilibrium calculations have been performedPhysics design of the NSTX UpgradePhysics design of the NSTX Upgrade Jon Menard, PPPL NSTX Program Dominion U ORNL PPPL PSI Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado

  20. Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)

    SciTech Connect (OSTI)

    Muons, Inc.

    2011-05-19

    This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the companyâ??s continued success and growth is directly related to our expertise in applying this program to interesting applications.

  1. FRN Request for Proposals for New or Upgraded Transmission Line...

    Broader source: Energy.gov (indexed) [DOE]

    K. McDonald, Assistant Administrator, Office of Corporate Operations, Southwestern Power Administration, One West Third Street, Tulsa, OK 74103; or jim.mcdonald@swpa.gov. For...

  2. Modeling uncertainty in the New York City no. 7 subway line extension project using Decision Aids for Tunnelling (DAT)

    E-Print Network [OSTI]

    Hung, Vinnie

    2012-01-01

    Given the frequent cost overruns and schedule delays associated with underground construction projects, it is imperative that a detailed estimate of both be developed and considered prior to starting construction. The ...

  3. An Archaeological Survey for the Coleman County Special Utility District Phase 7 Water Line Project in Coleman County Texas 

    E-Print Network [OSTI]

    Moore, William

    2015-07-30

    An archaeological survey of three segments of a proposed 26.1 mile water line and a 60 foot x 60 foot tract that will be the site of proposed expansion to an existing water storage tank in central County County, Texas was performed on October 14...

  4. The photospheric solar oxygen project: IV. 3D-NLTE investigation of the 777 nm triplet lines

    E-Print Network [OSTI]

    Steffen, M; Caffau, E; Ludwig, H -G; Bonifacio, P; Cayrel, R; Ku?inskas, A; Livingston, W C

    2015-01-01

    The solar photospheric oxygen abundance is still widely debated. Adopting the solar chemical composition based on the "low" oxygen abundance, as determined with the use of three-dimensional (3D) hydrodynamical model atmospheres, results in a well-known mismatch between theoretical solar models and helioseismic measurements that is so far unresolved. We carry out an independent redetermination of the solar oxygen abundance by investigating the center-to-limb variation of the OI IR triplet lines at 777 nm in different sets of spectra with the help of detailed synthetic line profiles based on 3D hydrodynamical CO5BOLD model atmospheres and 3D non-LTE line formation calculations with NLTETD. The idea is to simultaneously derive the oxygen abundance,A(O), and the scaling factor SH that describes the cross-sections for inelastic collisions with neutral hydrogen relative the classical Drawin formula. The best fit of the center-to-limb variation of the triplet lines achieved with the CO5BOLD 3D solar model is clearly...

  5. Analysis Efforts Supporting NSTX Upgrades

    SciTech Connect (OSTI)

    H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

    2010-11-29

    The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

  6. Potential Peak Load Reductions From Residential Energy Efficient Upgrades 

    E-Print Network [OSTI]

    Meisegeier, D.; Howes, M.; King, D.; Hall, J.

    2002-01-01

    the potential peak load reductions from residential energy efficiency upgrades in hot and humid climates. First, a baseline scenario is established. Then, the demand and consumption impacts of individual upgrade measures are assessed. Several of these upgrades...

  7. MAST-Upgrade Advancing compact fusion sources

    E-Print Network [OSTI]

    MAST-Upgrade Advancing compact fusion sources #12;#12;The Mega Amp Spherical Tokamak (MAST) is the centrepiece of the UK's fusion research programme. It has led studies into the spherical tokamak, a compact to the drive towards commercial fusion power. 1. Testing reactor concepts. MAST-Upgrade will be the first

  8. SQL Server 2014 Upgrade Technical Guide

    E-Print Network [OSTI]

    Chaudhuri, Surajit

    SQL Server 2014 Upgrade Technical Guide Writers: Ron Talmage, Richard Waymire, James Miller, Vivek, Larry Barnes, Pablo Ahumada Published: December 2014 Applies to: SQL Server 2014 Summary: This technical guide takes you through the essentials for upgrading SQL Server 2005, SQL Server 2008, and SQL Server

  9. Upgrading of Sergiev Posad department of Moscow NPO Radon

    SciTech Connect (OSTI)

    Debieve, Pierre [BELGATOM, Avenue Ariane 4, B 1200 Brussels (Belgium); Delecaut, Gregory; Vanleeuw, Daniel [Institut National des Radioelements - IRE, 6220 Fleurus (Belgium)

    2007-07-01

    Available in abstract form only. Full text of publication follows: BELGATOM and IRE Consortium has been awarded by the European Commission end of 2005 to conduct a project entitled 'Upgrading of Sergiev Posad Department of Moscow NPO Radon and the assessment of the radiological impact in the area nearby'. The main aims to achieve in the frame of this Europe-aid Project are: - Improvement of the performance and the safety level of the present radwaste management system, taking into account the additional waste expected from the Kurchatov Institute rehabilitation and from the forecast decommissioning of Research Reactors on the territory of Moscow. - Basic design and assistance for the procurement of upgrading equipment related to: - radwaste sorting and pretreatment - replacement of the hydraulic system of the existing super-compactor - characterisation system for radwaste 'Support for preparing the PSAR and PEIAR for new licensing' Assessment of the radiological impact in an area of 50 km radius around Sergiev Posad Department. - The initial duration of this Project is 3 years, starting beginning of 2006. This paper describes the difficulties encountered to start and implement the Project and its status at the half of the planned time schedule. (authors)

  10. NERI Final Project Report: On-Line Intelligent Self-Diagnostic Monitoring System for Next Generation Nuclear Power Plants

    SciTech Connect (OSTI)

    Bond, Leonard J.; Jarrell, Donald B.; Koehler, Theresa M.; Meador, Richard J.; Sisk, Daniel R.; Hatley, Darrel D.; Watkins, Kenneth S.; Chai, Jangbom; Kim, Wooshik

    2003-06-20

    This project provides a proof-of-principle technology demonstration for SDMS, where a distributed suite of sensors is integrated with active components and passive structures of types expected to be encountered in next generation nuclear power reactor and plant systems. The project employs state-of-the-art operational sensors, advanced stressor-based instrumentation, distributed computing, RF data network modules and signal processing to improve the monitoring and assessment of the power reactor system and gives data that is used to provide prognostics capabilities.

  11. CONSORTIUM GETS WISE ABOUT ENERGY UPGRADES | Department of Energy

    Energy Savers [EERE]

    upgrade rebates through their utility, and the programs would provide an additional rebate for upgrades that achieved more than 15% energy savings. In Charleston, South...

  12. Shared Space vs. In-Unit Upgrades in Multifamily Buildings |...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Shared Space vs. In-Unit Upgrades in Multifamily Buildings Shared Space vs. In-Unit Upgrades in Multifamily Buildings Better Buildings Neighborhood Program Multifamily Peer...

  13. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

  14. Energy Efficiency Upgrades Help Retired Military Officers Save...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement...

  15. EECBG Success Story: Energy Efficiency Upgrades Part of Winning...

    Energy Savers [EERE]

    Energy Efficiency Upgrades Part of Winning Formula for Oregon School District EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for Oregon School District...

  16. Capturing Energy Upgrades in the Real Estate Transaction | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Capturing Energy Upgrades in the Real Estate Transaction Capturing Energy Upgrades in the Real Estate Transaction Because green building techniques and products may impact the...

  17. Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades...

    Office of Environmental Management (EM)

    Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades A photo of a residence. Energize Phoenix...

  18. Better Buildings Neighborhood Initiative Upgrades 100,000 Buildings...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Buildings Neighborhood Initiative Upgrades 100,000 Buildings, Saves 730 Million on Energy Bills Better Buildings Neighborhood Initiative Upgrades 100,000 Buildings, Saves...

  19. Progress on ARRA-funded Facility & Capability Upgrades for the...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ARRA-funded Facility & Capability Upgrades for the Battery AbuseSafety Laboratory Progress on ARRA-funded Facility & Capability Upgrades for the Battery AbuseSafety Laboratory...

  20. EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

  1. EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration EIS so that WAPA could supplement it in support of WAPA’s National Environmental Policy Act requirements for a related project (see DOE/EIS-0116-S1).

  2. Guidelines for Home Energy Professionals Project: Benefits for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    home. The Guidelines for Home Energy Professionals project fosters the growth of a high-quality residential energy upgrade market and a skilled, credentialed workforce. As a...

  3. Guidelines for Home Energy Professionals Project: Benefits for...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Guidelines for Home Energy Professionals project fosters the growth of a high-quality residential energy upgrade market and a skilled, credentialed workforce. As a...

  4. Guidelines for Home Energy Professionals Project: Benefits for...

    Broader source: Energy.gov (indexed) [DOE]

    The Guidelines for Home Energy Professionals project fosters the growth of a high-quality residential energy upgrade market and a skilled, credentialed workforce. As a result,...

  5. Evaluation of Canal Lining Projects in the Lower Rio Grande Valley of Texas: 2011 Ratings and Analysis 

    E-Print Network [OSTI]

    Bonaiti, Gabriele; Karimov, Askar; Fipps, Guy

    2011-01-01

    ........................................................................................ 18 Figure 11. Cuts/tears caused by vandalism or traffic, and quickly enlarging due to shrinkage .................. 19 Figure 12. Steel anchors added to try to keep the liner from shrinking and floating .................................. 20 Figure.../tears caused by vandalism or traffic, and quickly enlarging due to shrinkage - 20 - Figure 12. Steel anchors added to try to keep the liner from shrinking and floating - 21 - Polyurethane Of the nine (9) polyurethane projects, one (1...

  6. Dual array 3D electron cyclotron emission imaging at ASDEX Upgrade

    SciTech Connect (OSTI)

    Classen, I. G. J., E-mail: I.G.J.Classen@differ.nl; Bogomolov, A. V. [FOM-Institute DIFFER, Dutch Institute for Fundamental Energy Research, 3430 BE Nieuwegein (Netherlands); Domier, C. W.; Luhmann, N. C. [Department of Applied Science, University of California at Davis, Davis, California 95616 (United States); Suttrop, W.; Boom, J. E. [Max-Planck-Institut für Plasmaphysik, Boltzmannstraße 2, 85748 Garching (Germany); Tobias, B. J. [Princeton Plasma Physics Laboratory, Princeton, New Jersey 08540 (United States); Donné, A. J. H. [FOM-Institute DIFFER, Dutch Institute for Fundamental Energy Research, 3430 BE Nieuwegein (Netherlands); Department of Applied Physics, Eindhoven University of Technology, 5600 MB Eindhoven (Netherlands)

    2014-11-15

    In a major upgrade, the (2D) electron cyclotron emission imaging diagnostic (ECEI) at ASDEX Upgrade has been equipped with a second detector array, observing a different toroidal position in the plasma, to enable quasi-3D measurements of the electron temperature. The new system will measure a total of 288 channels, in two 2D arrays, toroidally separated by 40 cm. The two detector arrays observe the plasma through the same vacuum window, both under a slight toroidal angle. The majority of the field lines are observed by both arrays simultaneously, thereby enabling a direct measurement of the 3D properties of plasma instabilities like edge localized mode filaments.

  7. Jefferson Lab awards upgrade contracts (Inside Business) | Jefferson...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    https:www.jlab.orgnewsreleasesjefferson-lab-awards-upgrade-contracts Submitted: Friday, January 9...

  8. System and process for upgrading hydrocarbons

    SciTech Connect (OSTI)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  9. Improving the Software Upgrade Value Stream

    E-Print Network [OSTI]

    Ippolito, Brian

    This paper reports findings from a two-year study to identify Lean practices for deriving software requirements from aerospace system level requirements, with a goal towards improving the software upgrade value stream.

  10. Upgrade Your Refinery for Energy Conservation 

    E-Print Network [OSTI]

    Johnnie, D. H., Jr.; Klooster, H. J.

    1983-01-01

    Upgrading existing refineries for efficient energy utilization imposes strict restraints upon design engineers. Present and future production requirements must be defined. Reliable operating data must be obtained from historical records and test...

  11. The Sloan Digital Sky Survey Reverberation Mapping Project: First Broad-line Hbeta and MgII Lags at z>~0.3 from six-Month Spectroscopy

    E-Print Network [OSTI]

    Shen, Yue; Grier, C J; Peterson, Bradley M; Denney, Kelly D; Trump, Jonathan R; Sun, Mouyuan; Brandt, W N; Kochanek, Christopher S; Dawson, Kyle S; Green, Paul J; Greene, Jenny E; Hall, Patrick B; Ho, Luis C; Jiang, Linhua; Kinemuchi, Karen; McGreer, Ian D; Petitjean, Patrick; Richards, Gordon T; Schneider, Donald P; Strauss, Michael A; Tao, Charling; Wood-Vasey, W M; Zu, Ying; Pan, Kaike; Bizyaev, Dmitry; Ge, Jian; Oravetz, Daniel; Simmons, Audrey

    2015-01-01

    Reverberation mapping (RM) measurements of broad-line region (BLR) lags in z>0.3 quasars are important for directly measuring black hole masses in these distant objects, but so far there have been limited attempts and success given the practical difficulties of RM in this regime. Here we report preliminary results of 15 BLR lag measurements from the Sloan Digital Sky Survey Reverberation Mapping (SDSS-RM) project, a dedicated RM program with multi-object spectroscopy designed for RM over a wide redshift range. The lags are based on the 2014 spectroscopic light curves alone (32 epochs over 6 months) and focus on the Hbeta and MgII broad lines in the 100 lowest-redshift (z0.3 is not yet possible due to the limitations in our current lag sample and selection biases inherent to our program. Our results demonstrate the general feasibility and potential of multi-object RM for z>0.3 quasars, and motivate more intensive spectroscopic and photometric monitoring to derive high-quality lag measurements for these objects...

  12. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    SciTech Connect (OSTI)

    Saraev, O. [Beloyarsk Nuclear Power Plant, Zarechny (Russian Federation); Haase, M.; Smarto, C. [Dept. of Energy, Washington, DC (United States); Mikkelsen, K.; Heinberg, C. [Pacific Northwest National Labs., Richland, WA (United States); Showalter, R.; Soo Hoo, M. [Sandia National Labs., Albuquerque, NM (United States); Hatcher, C.; Forehand, M. [Los Alamos National Lab., NM (United States)

    1998-08-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers.

  13. Nuclear Energy Research Initiative Project No. 02 103 Innovative Low Cost Approaches to Automating QA/QC of Fuel Particle Production Using On Line Nondestructive Methods for Higher Reliability Final Project Report

    SciTech Connect (OSTI)

    Ahmed, Salahuddin; Batishko, Charles R.; Flake, Matthew; Good, Morris S.; Mathews, Royce; Morra, Marino; Panetta, Paul D.; Pardini, Allan F.; Sandness, Gerald A.; Tucker, Brian J.; Weier, Dennis R.; Hockey, Ronald L.; Gray, Joseph N.; Saurwein, John J.; Bond, Leonard J.; Lowden, Richard A.; Miller, James H.

    2006-02-28

    This Nuclear Energy Research Initiative (NERI) project was tasked with exploring, adapting, developing and demonstrating innovative nondestructive test methods to automate nuclear coated particle fuel inspection so as to provide the United States (US) with necessary improved and economical Quality Assurance and Control (QA/QC) that is needed for the fuels for several reactor concepts being proposed for both near term deployment [DOE NE & NERAC, 2001] and Generation IV nuclear systems. Replacing present day QA/QC methods, done manually and in many cases destructively, with higher speed automated nondestructive methods will make fuel production for advanced reactors economically feasible. For successful deployment of next generation reactors that employ particle fuels, or fuels in the form of pebbles based on particles, extremely large numbers of fuel particles will require inspection at throughput rates that do not significantly impact the proposed manufacturing processes. The focus of the project is nondestructive examination (NDE) technologies that can be automated for production speeds and make either: (I) On Process Measurements or (II) In Line Measurements. The inspection technologies selected will enable particle “quality” qualification as a particle or group of particles passes a sensor. A multiple attribute dependent signature will be measured and used for qualification or process control decisions. A primary task for achieving this objective is to establish standard signatures for both good/acceptable particles and the most problematic types of defects using several nondestructive methods.

  14. Level-2 Calorimeter Trigger Upgrade at CDF

    SciTech Connect (OSTI)

    Flanagan, G.U.; /Purdue U.

    2007-04-01

    The CDF Run II Level-2 calorimeter trigger is implemented in hardware and is based on an algorithm used in Run I. This system insured good performance at low luminosity obtained during the Tevatron Run II. However, as the Tevatron instantaneous luminosity increases, the limitations of the current system due to the algorithm start to become clear. In this paper, we will present an upgrade of the Level-2 calorimeter trigger system at CDF. The upgrade is based on the Pulsar board, a general purpose VME board developed at CDF and used for upgrading both the Level-2 tracking and the Level-2 global decision crate. This paper will describe the design, hardware and software implementation, as well as the advantages of this approach over the existing system.

  15. Energy Upgrade of the Siam Photon Source

    SciTech Connect (OSTI)

    Rugmai, S.; Rujirawat, S.; Hoyes, G. G.; Prawanta, S.; Kwankasem, A.; Siriwattanapitoon, S.; Suradet, N.; Pimol, P.; Junthong, N.; Boonsuya, S.; Janpuang, P.; Prawatsri, P.; Klysubun, P.

    2007-01-19

    The energy upgrade of the storage ring is part of the plans to develop x-ray production capability of the Siam Photon Source. Simulations have been carried out. The bending magnet power supply has been replaced. Energy of the injected 1 GeV beam from the injector is then ramped up 20% in the storage ring. Studies for modification of bending magnet poles have been done to evaluate possibility of further increasing the beam energy to 1.4 GeV in the future. Studies of the energy upgrade plan and details of energy ramping process, together with beam measurements are presented.

  16. STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING

    SciTech Connect (OSTI)

    Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

    2012-07-01

    CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

  17. Living Comfortably: A Consumer's Guide to Home Energy Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker...

  18. Sandia Lightning Early Warning Network: Digital-based upgrade

    SciTech Connect (OSTI)

    Boyd, G.M.

    1994-05-01

    This report describes the layout and operation of the recently upgraded Sandia Lightning Early Warning Network, which was upgraded from an analog-based to a digital-based telemetry system.

  19. Upgrading : an alternative approach towards housing reform in China

    E-Print Network [OSTI]

    He, Fang, 1956-

    1989-01-01

    The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

  20. Energy Savers: Your One Stop Shop for Energy Efficiency Upgrades...

    Office of Environmental Management (EM)

    Your One Stop Shop for Energy Efficiency Upgrades Energy Savers: Your One Stop Shop for Energy Efficiency Upgrades This is a presentation from Energy Impact Illinois posted on the...

  1. Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    564 Upgrades in Record Time Spotlight on Austin, Texas: Best Offer Ever Produces 564 Upgrades in Record Time This Better Buildings case study from April 2011 focuses on grantee...

  2. Automatic Software Upgrades for Distributed Systems (PhD thesis)

    E-Print Network [OSTI]

    Ajmani, Sameer

    2005-10-06

    Upgrading the software of long-lived, highly-available distributedsystems is difficult. It is not possible to upgrade all the nodes in asystem at once, since some nodes may be unavailable and halting thesystem for an ...

  3. Systems integration and upgrade of an Engineering Flight Simulator 

    E-Print Network [OSTI]

    Alcorn, William Pleasant

    2002-01-01

    This thesis presents the system integration and upgrade of the Texas A&M Flight Mechanics Laboratory Engineering Flight Simulator (EFS). This upgrade replaced the previous EFS, a simplistic design that did not resemble an aircraft cockpit...

  4. The JLAB 12 GeV Energy Upgrade of CEBAF

    SciTech Connect (OSTI)

    Harwood, Leigh H.

    2013-12-01

    This presentation should describe the progress of the 12GeV Upgrade of CEBAF at Jefferson Lab. The status of the upgrade should be presented as well as details on the construction, procurement, installation and commissioning of the magnet and SRF components of the upgrade.

  5. Heavy Oil Upgrading from Electron Beam (E-Beam) Irradiation 

    E-Print Network [OSTI]

    Yang, Daegil

    2011-02-22

    to upgrade. This thesis demonstrates that electron beam (E-Beam) heavy oil upgrading, which uses unique features of E-Beam irradiation, may be used to improve conventional heavy oil upgrading. E-Beam processing lowers the thermal energy requirements and could...

  6. CMS: Present status, limitations, and upgrade plans

    SciTech Connect (OSTI)

    Cheung, H.W.K.; /Fermilab; ,

    2011-09-01

    An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

  7. ELECTRONICS UPGRADE OF HIGH RESOLUTION MASS SPECTROMETERS

    SciTech Connect (OSTI)

    Mcintosh, J; Joe Cordaro, J

    2008-03-10

    High resolution mass spectrometers are specialized systems that allow researchers to determine the exact mass of samples to four significant digits by using magnetic and electronic sector mass analyzers. Many of the systems in use today at research laboratories and universities were designed and built more than two decades ago. The manufacturers of these systems have abandoned the support for some of the mass spectrometers and parts to power and control them have become scarce or obsolete. The Savannah River National Laboratory has been involved in the upgrade of the electronics and software for these legacy machines. The Electronics Upgrade of High Resolution Mass Spectrometers consists of assembling high-end commercial instrumentation from reputable manufacturers with a minimal amount of customization to replace the electronics for the older systems. By taking advantage of advances in instrumentation, precise magnet control can be achieved using high resolution current sources and continuous feedback from a high resolution hall-effect probe. The custom equipment include a precision voltage divider/summing amplifier chassis, high voltage power supply chassis and a chassis for controlling the voltage emission for the mass spectrometer source tube. The upgrade package is versatile enough to interface with valve control, vacuum and other instrumentation. Instrument communication is via a combination of Ethernet and traditional IEEE-488 GPIB protocols. The system software upgrades include precision control, feedback and spectral waveform analysis tools.

  8. MAST Upgrade Advancing compact fusion sources

    E-Print Network [OSTI]

    MAST Upgrade Advancing compact fusion sources 4 1 Off) is the centrepiece of the UK's fusion programme. MAST has led studies into the spherical tokamak, a compact fusion research: · Make the case for a fusion Component Test Facility. · Add to the knowledge base for ITER

  9. Recent advances in upgrading large pumps

    SciTech Connect (OSTI)

    Nolt, J.R. Jr.; Russell, G.J. [American Hydro Corp., York, PA (United States)

    1995-12-31

    The benefits of upgrading hydraulic turbines and pump/turbines via the installation of custom designed replacement runners has been well documented in recent years. The increased operating efficiency and capacity, and improved cavitation and operating characteristics of modern replacement runners bears strong testimony to the specialized design an manufacturing techniques developed by turbine manufacturers who specialize in the upgrade business. The integration of computerized design and manufacturing technologies has resulted in the production of turbine and pump/turbine runners with a quality level not approachable with traditional techniques. This same technology can have dramatic results when applied to the upgrade of large pumps. The energy utilized to operate large irrigation, storage and cooling water pumps represents a major cost to the owners of the pumps. The operation of a 25,000 horsepower pump through one irrigation season represents an energy cost of approximately $4,000,000 per year. An increase in efficiency of 2% could result in an energy cost savings of over $100,000 per year. Pump impellers are subject to cavitation and erosion damage which reduces pump efficiency and capacity and may require costly maintenance and repairs. When designed and manufactured using modern computerized methods, an upgraded impeller can operate cavitation free at higher capacities and efficiencies than the original design. The costs of pump operation and maintenance can be substantially reduced by the replacement of the impellers with impellers of modern, custom design.

  10. Structural analysis of fuel assembly clads for the Upgraded Transient Reactor Test Facility (TREAT Upgrade)

    SciTech Connect (OSTI)

    Ewing, T.F.; Wu, T.S.

    1986-01-01

    The Upgraded Transient Reactor Test Facility (TREAT Upgrade) is designed to test full-length, pre-irradiated fuel pins of the type used in large LMFBRs under accident conditions, such as severe transient overpower and loss-of-coolant accidents. In TREAT Upgrade, the central core region is to contain new fuel assemblies of higher fissile loadings to maximize the energy deposition to the test fuel. These fuel assemblies must withstand normal peak clad temperatures of 850/sup 0/C for hundreds of test transients. Due to high temperatures and gradients predicted in the clad, creep and plastic strain effects are significant, and the clad structural behavior cannot be analyzed by conventional linear techniques. Instead, the detailed elastic-plastic-creep behavior must be followed along the time-dependent load history. This paper presents details of the structural evaluations of the conceptual TREAT Upgrade fuel assembly clads.

  11. Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-08-01

    This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

  12. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  13. Pressure Safety of JLAB 12GeV Upgrade Cryomodule

    SciTech Connect (OSTI)

    Cheng, Gary [JLAB; Wiseman, Mark A. [JLAB; Daly, Ed [JLAB

    2009-11-01

    This paper reviews pressure safety considerations, per the US Department of Energy (DOE) 10CFR851 Final Rule [1], which are being implemented during construction of the 100 Megavolt Cryomodule (C100 CM) for Jefferson Lab’s 12 GeV Upgrade Project. The C100 CM contains several essential subsystems that require pressure safety measures: piping in the supply and return end cans, piping in the thermal shield and the helium headers, the helium vessel assembly which includes high RRR niobium cavities, the end cans, and the vacuum vessel. Due to the vessel sizes and pressure ranges, applicable national consensus code rules are applied. When national consensus codes are not applicable, equivalent design and fabrication approaches are identified and implemented. Considerations for design, material qualification, fabrication, inspection and examination are summarized. In addition, JLAB’s methodologies for implementation of the 10 CFR 851 requirements are described.

  14. Multifamily Projects

    Broader source: Energy.gov [DOE]

    Presents Energy Smart Colorado's approach to driving demand for multifamily residential energy efficiency upgrades.

  15. Overview of the physics and engineering design of NSTX upgrade

    SciTech Connect (OSTI)

    Menard, J. E. [Princeton Plasma Physics Laboratory (PPPL); Gerhardt, S. P. [Princeton Plasma Physics Laboratory (PPPL); Bell, M. [Princeton Plasma Physics Laboratory (PPPL); Bialek, J [Columbia University; Brooks, A. [Princeton Plasma Physics Laboratory (PPPL); Canik, John [ORNL; Chrzanowski, J. [Princeton Plasma Physics Laboratory (PPPL); Denault, M [Princeton Plasma Physics Laboratory (PPPL)

    2012-01-01

    The spherical tokamak (ST) is a leading candidate for a Fusion Nuclear Science Facility (FNSF) due to its compact size and modular configuration. The National Spherical Torus eXperiment (NSTX) is a MA-class ST facility in the US actively developing the physics basis for an ST-based FNSF. In plasma transport research, ST experiments exhibit a strong (nearly inverse) scaling of normalized confinement with collisionality, and if this trend holds at low collisionality, high fusion neutron fluences could be achievable in very compact ST devices. A major motivation for the NSTX Upgrade (NSTX-U) is to span the next factor of 3-6 reduction in collisionality. To achieve this collisionality reduction with equilibrated profiles, NSTX-U will double the toroidal field, plasma current, and NBI heating power and increase the pulse length from 1-1.5 s to 5-8 s. In the area of stability and advanced scenarios, plasmas with higher aspect ratio and elongation, high beta(N), and broad current profiles approaching those of an ST-based FNSF have been produced in NSTX using active control of the plasma beta and advanced resistive wall mode control. High non-inductive current fractions of 70% have been sustained for many current diffusion times, and the more tangential injection of the 2nd NBI of the Upgrade is projected to increase the NBI current drive by up to a factor of 2 and support 100% non-inductive operation. More tangential NBI injection is also projected to provide non-solenoidal current ramp-up as needed for an ST-based FNSF. In boundary physics, NSTX measures an inverse relationship between the scrape-off layer heat-flux width and plasma current that could unfavourably impact next-step devices. Recently, NSTX has successfully demonstrated substantial heat-flux reduction using a snowflake divertor configuration, and this type of divertor is incorporated in the NSTX-U design. The physics and engineering design supporting NSTX Upgrade is described.

  16. Catalytic Upgrading of Sugars Presentation for BETO 2015 Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPLICATIONS SOLVENT & HYDROXY- ACID POLYMERS CHELATING EXTRACTANT POLYMER ELECTROLYTES GREEN SOLVENTS, PHARMA FUEL ADDITIVE, LUBRICANTS Conducting catalysis R&D to build...

  17. NSTX Upgrade Project STRUCTURAL CALCULATION OF THE TF FLAG KEY

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    source of design information including computer program titles and revision levels.) 1] NSTX-CALC-13] NSTX Structural Design Criteria Document, I. Zatz [3] NSTX Design Point June 2010 http://www.pppl.gov/~neumeyer/NSTX_CSU/Design blade due to the OOP torque. 3.)The shear strength of the epoxy used to bond the CRES insert into the G

  18. J.R. Simplot: Burner Upgrade Project Improves Performance and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Saves Energy at a Large Food Processing Plant (September 2005) More Documents & Publications Steam System Efficiency Optimized After J.R. Simplot Fertilizer Plant...

  19. J.R. Simplot: Burner Upgrade Project Improves Performance and...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in annual energy costs * Saves 52,000 MMBtu of natural gas annually * Improves boiler performance * Saves 526,000 kWh per year * Achieves a simple payback of less than 14...

  20. Biological Upgrading of Sugars Presentation for BETO 2015 Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hyd.- Fermentor Glucose utilization (total) 98% 80% 100% Lipid content 59% 60% 57% Volumetric productivity (gL-hr) at 72 h 0.05 (batch culture) 0.18 (batch culture) 0.29 (batch...

  1. Nuclear Materials Safeguards and Security Upgrade Project Completed Under

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformationJesseworkSURVEY UNIVERSE The 2014 survey includes degreesRecoverySecurityBudget

  2. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    line in Benton and Yakima Counties, Washington. Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryMidway-Moxee...

  3. Upgrade of Fermilab/NICADD photoinjector laboratory

    SciTech Connect (OSTI)

    Piot, P.; Edwards, H.; /Fermilab; Huning, M.; /DESY; Li, J.; Tikhoplav, R.; /Rochester U.; Koeth, T.; /Rutgers U., Piscataway

    2005-05-01

    The Fermilab/NICADD photoinjector laboratory is a 16 MeV electron accelerator dedicated to beam dynamics and advanced accelerator physics studies. FNPL will soon be capable of operating at {approx} 40 MeV, after the installation of a high gradient TESLA cavity. In this paper we present the foreseen design for the upgraded facility along with its performance. We discuss the possibilities of using of FNPL as an injector for the superconducting module and test facility (SM&TF).

  4. NSTX Upgrade FDR Calculation Executive Summaries

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    performed to support the NSTX Upgrade design effort. Some, but not most, have been reviewed and signed.1.2 NSTXU-CALC-12-04-00 PF2 / PF3 Bolting, Bracket, and weld Stress P. Titus I.Zatz 1.1.2 NSTXU-CALC-12-05-00 PF4 and PF5 Support Analysis P. Titus I.Zatz 1.1.2 NSTXU-CALC-12-06-00 Aluminum Block (To Be Revised

  5. Steam-system upgrades | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page| Open Energy Information Serbia-Enhancing CapacityVectren) Jumpand MaintenanceStationary Power ServicesSte.upgrades

  6. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; Lawson, J. E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G. J.

    2014-06-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

  7. Independent Verification Survey Report for the Offsite Portion of the Potential Release Site-7 Abandoned Sanitary Line, Miamisburg Closure Project, Miamisburg, Ohio

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-08-15

    The ORISE objective was to confirm that the remedial action process implemented by the contractor was in accordance with the PRS-7 Work Package. Following removal of the sanitary line, the soil beneath the line would be sampled to determine if remediation was required (ARC 2007a).

  8. Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado

    SciTech Connect (OSTI)

    N /A

    2000-03-20

    The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

  9. Avoiding Distribution System Upgrade Costs Using Distributed Generation

    SciTech Connect (OSTI)

    Schienbein, Lawrence A.; Balducci, Patrick J.; Nguyen, Tony B.; Brown, Daryl R.; DeSteese, John G.; Speer, Gregory A.

    2004-01-20

    PNNL, in cooperation with three utilities, developed a database and methodology to analyze and characterize the avoided costs of Distributed Generation (DG) deployment as an alternative to traditional distribution system investment. After applying a number of screening criteria to the initial set of 307 cases, eighteen were selected for detailed analysis. Alternative DG investment scenarios were developed for these cases to permit capital, operation, maintenance, and fuel costs to be identified and incorporated into the analysis. The “customer-owned” backup power generator option was also investigated. The results of the analysis of the 18 cases show that none yielded cost savings under the alternative DG scenarios. However, the DG alternative systems were configured using very restrictive assumptions concerning reliability, peak rating, engine types and acceptable fuel. In particular it was assumed that the DG alternative in each case must meet the reliability required of conventional distribution systems (99.91% reliability). The analysis was further constrained by a requirement that each substation meet the demands placed upon it by a one in three weather occurrence. To determine if, by relaxing these requirements, the DG alternative might be more viable, one project was re-examined. The 99.91% reliability factor was still assumed for normal operating conditions but redundancy required to maintain reliability was relaxed for the relatively few hours every three years where extreme weather caused load to exceed present substation capacity. This resulted in the deferment of capital investment until later years and reduced the number of engines required for the project. The cost of both the conventional and DG alternative also dropped because the centralized power generation, variable O&M, and DG fuels costs were calculated based on present load requirements in combination with long-term forecasts of load growth, as opposed to load requirements plus a buffer based on predictions of extraordinary weather conditions. Application of the relaxed set of assumptions reduced the total cost of the DG alternative by roughly 57 percent from $7.0 million to $3.0 million. The reduction, however, did not change the overall result of the analysis, as the cost of the conventional distribution system upgrade alternative remained lower at $1.7 million. This paper also explores the feasibility of using a system of backup generators to defer investment in distribution system infrastructure. Rather than expanding substation capacity at substations experiencing slow load growth rates, PNNL considered a scenario where diesel generators were installed on location at customers participating in a program designed to offer additional power security and reliability to the customer and connection to the grid. The backup generators, in turn, could be used to meet peak demand for a limited number of hours each year, thus deferring distribution system investment. Data from an existing program at one of the three participating utilities was used to quantify the costs associated with the backup generator scenario. The results of the “customer owned” backup power generator analysis showed that in all cases the nominal cost of the DG scenario is more than the nominal cost of the base-case conventional distribution system upgrade scenario. However, in two of the cases the total present value costs of the alternative backup generator scenarios were between 15 and 22% less than those for the conventional scenarios. Overall, the results of the study offer considerable encouragement that the use of DG systems can defer conventional distribution system upgrades under the right conditions and when the DG configurations are intelligently designed. Using existing customer-owned DG to defer distribution system upgrades appears to be an immediate commercially-viable opportunity.

  10. Methods and apparatuses for preparing upgraded pyrolysis oil

    DOE Patents [OSTI]

    Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

    2013-10-01

    Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

  11. Using Qualified Energy Conservation Bonds for Public Building Upgrades. Reducing Energy Bills in the City of Philadelphia

    SciTech Connect (OSTI)

    Zimring, Mark

    2012-07-18

    Qualified Energy Conservation Bonds (QECBs) are federally-subsidized bonds that enable state, tribal, and local government issuers to borrow money to fund a range of energy conservation projects, including public building upgrades that reduce energy use by at least 20 percent, at very attractive borrowing rates and long terms. As part of the American Recovery and Reinvestment Act (ARRA), the City of Philadelphia received a $15 million QECB award from the U.S. Department of the Treasury (Treasury). The city leveraged $6.25 million of its QECB allocation to finance half of a $12.6 million initiative to upgrade the energy efficiency of City buildings. The upgrades to four city facilities are expected to deliver over $10 million of net savings, and are a major step towards achieving the city’s goal of reducing government energy consumption by 30 percent by 2015.

  12. EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming.

  13. An examination of the costs and critical characteristics of electric utility distribution system capacity enhancement projects

    SciTech Connect (OSTI)

    Balducci, Patrick J.; Schienbein, Lawrence A.; Nguyen, Tony B.; Brown, Daryl R.; Fathelrahman, Eihab M.

    2004-06-01

    This report classifies and analyzes the capital and total costs (e.g., income tax, property tax, depreciation, centralized power generation, insurance premiums, and capital financing) associated with 130 electricity distribution system capacity enhancement projects undertaken during 1995-2002 or planned in the 2003-2011 time period by three electric power utilities operating in the Pacific Northwest. The Pacific Northwest National Laboratory (PNNL), in cooperation with participating utilities, has developed a large database of over 3,000 distribution system projects. The database includes brief project descriptions, capital cost estimates, the stated need for each project, and engineering data. The database was augmented by additional technical (e.g., line loss, existing substation capacities, and forecast peak demand for power in the area served by each project), cost (e.g., operations, maintenance, and centralized power generation costs), and financial (e.g., cost of capital, insurance premiums, depreciations, and tax rates) data. Though there are roughly 3,000 projects in the database, the vast majority were not included in this analysis because they either did not clearly enhance capacity or more information was needed, and not available, to adequately conduct the cost analyses. For the 130 projects identified for this analysis, capital cost frequency distributions were constructed, and expressed in terms of dollars per kVA of additional capacity. The capital cost frequency distributions identify how the projects contained within the database are distributed across a broad cost spectrum. Furthermore, the PNNL Energy Cost Analysis Model (ECAM) was used to determine the full costs (e.g., capital, operations and maintenance, property tax, income tax, depreciation, centralized power generation costs, insurance premiums and capital financing) associated with delivering electricity to customers, once again expressed in terms of costs per kVA of additional capacity. The projects were sorted into eight categories (capacitors, load transfer, new feeder, new line, new substation, new transformer, reconductoring, and substation capacity increase) and descriptive statistics (e.g., mean, total cost, number of observations, and standard deviation) were constructed for each project type. Furthermore, statistical analysis has been performed using ordinary least squares regression analysis to identify how various project variables (e.g., project location, the primary customer served by the project, the type of project, the reason for the upgrade, size of the upgrade) impact the unit cost of the project.

  14. Honeymoons Lead to Upgrades in Western Vermont | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    to make energy efficiency upgrades, offering them a honeymoon might just be the motivation they need. NeighborWorks of Western Vermont (NWWVT) created a "honeymoon period" for...

  15. EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

  16. BEST OFFER EVER ACCELERATED TEXAS UPGRADES | Department of Energy

    Energy Savers [EERE]

    upgrades. Program Design: Historically, Austin Energy customers had taken advantage of rebate-only offers more often than loan-only offers. Austin Energy's Best Offer Ever allowed...

  17. California Member Connects Solar Adoption With Upgrades | Department...

    Energy Savers [EERE]

    adoption and energy upgrades by Better Buildings Residential Network member Center for Sustainable Energy (CSE) in California are helping solar companies realize that partnering...

  18. What's Working in Residential Energy Efficiency Upgrade Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Approaches and Lessons Learned" on May 20, 2011 in Washington, D.C. What's Working in Residential Energy Efficiency Upgrade Programs More Documents & Publications Strategies...

  19. WISCONSIN CITIES WORK TOGETHER TO ADVANCE UPGRADES | Department...

    Office of Environmental Management (EM)

    from the initial assessment through the completion of energy upgrades. They attended real estate events, home shows, and neighborhood events to promote energy efficiency. The...

  20. Federal Finance Facilities Available for Energy Efficiency Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2...

  1. Using QECBs for Street Lighting Upgrades: Lighting the Way to...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revenue Service Qualified Energy Conservation Bonds Using Qualified Energy Conservation Bonds for Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia...

  2. Community based outreach strategies in residential energy upgrade programs

    E-Print Network [OSTI]

    McEwen, Brendan (Brendan Carl Francis)

    2012-01-01

    Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

  3. Quality Control, Standardization of Upgrades, and Workforce Expectatio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expectations Better Buildings Residential Network Workforce Peer Exchange Call Series: Quality Control, Standardization of Upgrades, and Workforce Expectations, March 27, 2014....

  4. Energy Upgrade California Drives Demand From Behind the Wheel...

    Broader source: Energy.gov (indexed) [DOE]

    trailer with the Energy Upgrade California logo and graphics painted on the side. With a goal of "energy efficiency or bust," the California Center for Sustainable Energy (CCSE)...

  5. EECBG Success Story: County Partners with Siemens on Energy Upgrades...

    Broader source: Energy.gov (indexed) [DOE]

    including a solar photovoltaic energy system, LED lighting at municipal buildings, boiler upgrades, energy efficiency retrofits at the county government center, and a public...

  6. Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications Pathways for Algal Biofuels Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway Bioenergy Technologies Office Conversion R&D Pathway: Whole...

  7. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathway This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion...

  8. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks. Algal Lipid Extraction and...

  9. NSTX-U Control System Upgrades

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Erickson, K. G.; Gates, D. A.; Gerhardt, S. P.; Lawson, J. E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G. J.

    2014-06-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forwardmore »port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.« less

  10. The value of steam turbine upgrades

    SciTech Connect (OSTI)

    Potter, K.; Olear, D.

    2005-11-01

    Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

  11. Project Plan Remote Target Fabrication Refurbishment Project

    SciTech Connect (OSTI)

    Bell, Gary L; Taylor, Robin D

    2009-08-01

    In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of {sup 252}Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The {sup 252}Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of {sup 252}Cf; the average irradiation period is {approx}10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of {sup 252}Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and authorization for the work was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  12. The enhanced ASDEX Upgrade pellet centrifuge launcher

    SciTech Connect (OSTI)

    Plöckl, B.; Lang, P. T.

    2013-10-15

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

  13. UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY

    SciTech Connect (OSTI)

    Reza Kazimi, Arne Freyberger, Alicia Hofler, Andrew Hutton, Fay Hannon

    2012-07-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) accelerator at Jefferson Lab will be upgraded from 6 GeV to 12 GeV in the next few years. To meet the requirement of the new machine and to take the opportunity to improve the beam quality, the CEBAF injector will be upgraded with a higher voltage gun, a new booster, and a new accelerating RF module. The CEBAF injector creates and accelerates three beams at different currents simultaneously. The beams are interleaved, each at one third of the RF frequency, traveling through the same beam line. The higher voltage gun will lower the space charge effects. The new booster with optimized beam dynamics will complete the bunching process and provide initial acceleration matched to the new gun voltage. Using our latest SRF design, the new booster has significantly lower x/y coupling effects that should improve our beam setup and operation for the highly sensitive parity experiments scheduled for the CEBAF's future. Finally, the new accelerating RF module will roughly double the injector final energy to match the rest of the 12 GeV accelerator. In this paper we will provide more detail about this upgrade.

  14. Ammonia removal process upgrade to the Acme Steel Coke Plant

    SciTech Connect (OSTI)

    Harris, J.L. [Acme Steel Co., Chicago, IL (United States). Chicago Coke Plant

    1995-12-01

    The need to upgrade the ammonia removal process at the Acme Steel Coke Plant developed with the installation of the benzene NESHAP (National Emission Standard for Hazardous Air Pollutants) equipment, specifically the replacement of the final cooler. At Acme Steel it was decided to replace the existing open cooling tower type final cooler with a closed loop direct spray tar/water final cooler. This new cooler has greatly reduced the emissions of benzene, ammonia, hydrogen sulfide and hydrogen cyanide to the atmosphere, bringing them into environmental compliance. At the time of its installation it was not fully recognized as to the effect this would have on the coke oven gas composition. In the late seventies the decision had been made at Acme Steel to stop the production of ammonia sulfate salt crystals. The direction chosen was to make a liquid ammonia sulfate solution. This product was used as a pickle liquor at first and then as a liquid fertilizer as more markets were developed. In the fall of 1986 the ammonia still was brought on line. The vapors generated from the operation of the stripping still are directed to the inlet of the ammonia absorber. At that point in time it was decided that an improvement to the cyclical ammonia removal process was needed. The improvements made were minimal yet allowed the circulation of solution through the ammonia absorber on a continuous basis. The paper describes the original batch process and the modifications made which allowed continuous removal.

  15. Upgrades of the high resolution imaging x-ray crystal spectrometers on experimental advanced superconducting tokamak

    SciTech Connect (OSTI)

    Lu, B.; Wang, F.; Fu, J.; Li, Y.; Wan, B.; Shi, Y.; Bitter, M.; Hill, K. W.; Lee, S. G.

    2012-10-15

    Two imaging x-ray crystal spectrometers, the so-called 'poloidal' and 'tangential' spectrometers, were recently implemented on experimental advanced superconducting tokamak (EAST) to provide spatially and temporally resolved impurity ion temperature (T{sub i}), electron temperature (T{sub e}) and rotation velocity profiles. They are derived from Doppler width of W line for Ti, the intensity ratio of Li-like satellites to W line for Te, and Doppler shift of W line for rotation. Each spectrometer originally consisted of a spherically curved crystal and a two-dimensional multi-wire proportional counter (MWPC) detector. Both spectrometers have now been upgraded. The layout of the tangential spectrometer was modified, since it had to be moved to a different port, and the spectrometer was equipped with two high count rate Pilatus detectors (Model 100 K) to overcome the count rate limitation of the MWPC and to improve its time resolution. The poloidal spectrometer was equipped with two spherically bent crystals to record the spectra of He-like and H-like argon simultaneously and side by side on the original MWPC. These upgrades are described, and new results from the latest EAST experimental campaign are presented.

  16. Magnetic switching, final chapter, Book I: the ATA upgrade prototype

    SciTech Connect (OSTI)

    Birx, D.; Cook, E.; Hawkins, S.; Poor, S.; Reginato, L.; Schmidt, J.; Smith, M.W.

    1983-03-22

    Efforts directed at finding a 10 kHz switch to replace the current 1 kHz gas blown spark gap have culminated in a prototype for an upgrade of ATA. The design and performance of this prototype as well as possible options and recommendations concerning an eventual upgrade are described. 4 references, 9 figures.

  17. TMX-Upgrade neutral-beam injection system

    SciTech Connect (OSTI)

    Felker, B.; Kane, R.J.; Wong, R.L.; Calderon, M.O.; Moore, T.L.

    1981-10-05

    The TMX experiment proved that axial confinement of central-cell ions is improved ninefold by the electrostatic potential of end-cell plasmas. The TMX Upgrade task is to improve this confinement further. This paper discusses the injector system aspects of the TMX Upgrade.

  18. Analysis and Qualification Documentation The NSTX Upgrade Team

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Upgrade Final Design Review (6/22/2011) 4 NSTX CSU Calculation Index Historically What is Available Lodestar MIT Nova Photonics New York U ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Center Stack Upgrade Final Design Review (6/22/2011) Overview · This presentation is an overview

  19. Rebates Cut the Price of Big-Time Efficiency Upgrades

    Broader source: Energy.gov [DOE]

    One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy’s rebate programs that cut the cost of whole-house energy efficiency upgrades.

  20. A Hybrid Design of Project-X

    SciTech Connect (OSTI)

    Chou, W.; /Fermilab

    2009-05-01

    Project-X is a leading candidate of the next major accelerator construction project at Fermilab. The mission need of Project-X is to establish an intensity frontier for particle physics research, or more precisely, to build a multi-MW proton source for neutrino and other particle studies. Coupled with an upgraded Main Injector (MI) and Recycler, an 8 GeV superconducting RF (SRF) H- linac meets this need. However, a more cost effective approach would be a hybrid design, namely, a combination of a 2 GeV SRF linac and an 8 GeV rapid cycling synchrotron (RCS) in lieu of an 8 GeV SRF linac. This alternative design also meets the mission need but at a lower cost since a synchrotron is cheaper than a SRF linac. It retains the ability to use a 2 GeV SRF linac for ILC technology development. It reuses the existing Debuncher enclosure and Booster RF. The transport line of 2 GeV H- particles is shorter than the present 8 GeV design since stronger bending magnets can be used. The blackbody radiation stripping of H- particles will no longer be a problem and the requirement of a cryogenic beam screen can be eliminated. The efficiency of stripping foil is higher and injection loss (kJ) will be reduced by a factor of 4. This paper introduces this alternative design and describes briefly the major components in the design.

  1. Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades

    SciTech Connect (OSTI)

    Billingsley, Megan; Stuart, Elizabeth

    2011-08-17

    Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

  2. The 12 GeV Energy Upgrade at Jefferson Laboratory

    SciTech Connect (OSTI)

    Pilat, Fulvia C.

    2012-09-01

    Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

  3. Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department...

    Energy Savers [EERE]

    Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of Defense Exchange Facilities Kitchen Appliance Upgrades Improve Water Efficiency at U.S. Department of...

  4. Coordination of Transmission Line Transfer Capabilities

    E-Print Network [OSTI]

    Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Industry Representative Richard Goddard Portland General Electric Research Team Students Yuan Li Yonghong

  5. PROJECT DESCRIPTION PROJECT TIMELINE PROJECT COSTS FUNDING SOURCE 1 Akers Hall, originally constructed in 1964, requires major

    E-Print Network [OSTI]

    will replace the existing chiller plant, including demolition of the existing cooling tower and its associated enclosure at the Olin receiving area; installation of new components for the chilled water system; HVAC DESCRIPTION PROJECT TIMELINE PROJECT COSTS FUNDING SOURCE 3 Munn Ice Arena HVAC Upgrades and Ice

  6. Tile Calorimeter Upgrade Program for the Luminosity Increasing at the LHC

    E-Print Network [OSTI]

    ,

    2015-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter of the ATLAS experiment at the Large Hadron Collider (LHC). The LHC is scheduled to undergo a major upgrade, in 2022, for the High Luminosity LHC (HL-LHC). The ATLAS upgrade program for high luminosity is split into three phases: Phase-0 occurred during $2013-2014$ and prepared the LHC for Run 2; Phase-I, foreseen for 2019, will prepare the LHC for Run 3, whereafter the peak luminosity reaches $2-3 \\times 10^{34}$ cm$^{2}s^{-1}$; finally, Phase-II, which is foreseen for 2024, will prepare the collider for the HL-LHC operation ($5-7 \\times 10^{34}$ cm$^{2}s^{-1}$). The TileCal main activities for Phase-0 were the installation of the new low voltage power supplies and the activation of the TileCal third layer signal for assisting the muon trigger at $1.01.3$ (TileMuon Project). In Phase-II, a major upgrade in the TileCal readout electronics is planned. Except for the photomultipliers tubes (PMTs), most of the on- and off-detector e...

  7. Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption

    SciTech Connect (OSTI)

    Anna Lee Tonkovich

    2008-08-11

    The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

  8. ALICE TPC upgrade for High-Rate operations

    E-Print Network [OSTI]

    ,

    2015-01-01

    A new type of Time Projection Chamber (TPC) has been proposed for the upgrade of the ALICE (A Large Ion Collider Experiment at CERN) so as to cater to the high luminosity environment expected at the Large Hadron Collider (LHC) facility in future. This device will rely on the intrinsic ion back flow (IBF) suppression of Micro-Pattern Gas Detectors (MPGD) based technology in particular the Gas Electron Multiplier (GEM). GEM is to minimise the space charge effect in the main drift volume and thus will not require the standard gating grid and the resulting intrinsic dead time. It will thus be possible to read all minimum bias Pb--Pb events that the Large Hadron Collider (LHC) will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era in Run 3. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1~TByte/s. The new read-out chambers will consist of stacks of 4 GEM foils combining different hole pitches. In addition to a low ion...

  9. ALICE TPC upgrade for High-Rate operations

    E-Print Network [OSTI]

    Saikat Biswas

    2015-11-08

    A new type of Time Projection Chamber (TPC) has been proposed for the upgrade of the ALICE (A Large Ion Collider Experiment at CERN) so as to cater to the high luminosity environment expected at the Large Hadron Collider (LHC) facility in future. This device will rely on the intrinsic ion back flow (IBF) suppression of Micro-Pattern Gas Detectors (MPGD) based technology in particular the Gas Electron Multiplier (GEM). GEM is to minimise the space charge effect in the main drift volume and thus will not require the standard gating grid and the resulting intrinsic dead time. It will thus be possible to read all minimum bias Pb--Pb events that the Large Hadron Collider (LHC) will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era in Run 3. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1~TByte/s. The new read-out chambers will consist of stacks of 4 GEM foils combining different hole pitches. In addition to a low ion back flow ($<$ 1\\%) other important requirements are good energy resolution (better than 12\\% (sigma) for $^{55}$Fe X-rays) and operational stability.

  10. PEP-II Transverse Feedback Electronics Upgrade

    SciTech Connect (OSTI)

    Weber, J.M.; Chin, M.J.; Doolittle, L.R.; Akre, R.; /SLAC

    2006-03-13

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx{reg_sign} ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  11. PEP-II Transverse Feedback Electronics Upgrade

    SciTech Connect (OSTI)

    Weber, J.; Chin, M.; Doolittle, L.; Akre, R.

    2005-05-09

    The PEP-II B Factory at the Stanford Linear Accelerator Center (SLAC) requires an upgrade of the transverse feedback system electronics. The new electronics require 12-bit resolution and a minimum sampling rate of 238 Msps. A Field Programmable Gate Array (FPGA) is used to implement the feedback algorithm. The FPGA also contains an embedded PowerPC 405 (PPC-405) processor to run control system interface software for data retrieval, diagnostics, and system monitoring. The design of this system is based on the Xilinx(R) ML300 Development Platform, a circuit board set containing an FPGA with an embedded processor, a large memory bank, and other peripherals. This paper discusses the design of a digital feedback system based on an FPGA with an embedded processor. Discussion will include specifications, component selection, and integration with the ML300 design.

  12. Steam turbine upgrading: low-hanging fruit

    SciTech Connect (OSTI)

    Peltier, R.

    2006-04-15

    The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

  13. Upgrading the TFTR Transrex Power Supplies

    SciTech Connect (OSTI)

    J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

    2009-05-29

    In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).

  14. LLRF System for the CEBAF Separator Upgrade

    SciTech Connect (OSTI)

    Plawski, Tomasz E.; Bachimanchi, Ramakrishna; Hovater, J. Curt; Seidman, David J.; Wissmann, Mark J.

    2014-12-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. This system will work together with the existing 499 MHz RF Separator in order to allow simultaneous delivery of the beam to four CEBAF experimental halls. The RF system employs two digital LLRF systems controlling four cavities in a vector sum. Cavity tune information of the individual cavities is also obtained using a multiplexing scheme of the forward and reflected RF signals. In this paper we will present detailed LLRF design and the current status of the CEBAF 748.5/499 MHz beam extraction system.

  15. JET neutral beam power upgrade Introduction

    E-Print Network [OSTI]

    shutdown project · Hydraulic,vacuumcompatibilityandpower loading commissioning of the enhanced NB system · Nolosstimeinjuriesincurredaspartofthe shutdown · Commissioningactivitiesonhydraulicsystems and vacuum compatibility successfully

  16. Upgraded HFIR Fuel Element Welding System

    SciTech Connect (OSTI)

    Sease, John D [ORNL

    2010-02-01

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  17. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    100% Post-CAP This is based on a 3-year rolling average (FY10). TPC is Total Project Cost. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup...

  18. FMEA on the superconducting torus for the Jefferson Lab 12 GeV accelerator upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ghoshal, Probir K.; Biallas, George H.; Fair, Ruben J.; Rajput-Ghoshal, Renuka; Schneider, William J.; Legg, Robert A.; Kashy, David H.; Hogan, John P.; Wiseman, Mark A.; Luongo, Cesar; et al

    2015-01-16

    As part of the Jefferson Lab 12GeV accelerator upgrade project, Hall B requires two conduction cooled superconducting magnets. One is a magnet system consisting of six superconducting trapezoidal racetrack-type coils assembled in a toroidal configuration and the second is an actively shielded solenoidal magnet system consisting of 5 coils. Both magnets are to be wound with Superconducting Super Collider-36 NbTi strand Rutherford cable soldered into a copper channel. This paper describes the various failure modes in torus magnet along with the failure modes that could be experienced by the torus and its interaction with the solenoid which is located inmore »close proximity.« less

  19. Vibration Response Testing of the CEBAF 12GeV Upgrade Cryomodules

    SciTech Connect (OSTI)

    Davis, G. Kirk; Matalevich, Joseph R.; Wiseman, Mark A.; Powers, Thomas J.

    2012-09-01

    The CEBAF 12 GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. These cryomodules were tested during production to characterize their microphonic response in situ. For several early cryomodules, detailed (vibration) modal studies of the cryomodule string were performed during the assembly process to identify the structural contributors to the measured cryomodule microphonic response. Structural modifications were then modelled, implemented, and verified by subsequent modal testing and in-situ microphonic response testing. Interim and latest results from this multi-stage process will be reviewed.

  20. Greenbelt Homes Pilot Program. Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    SciTech Connect (OSTI)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-22

    The U.S. Department of Energy Building America team Partnership for Home Innovation wrote a report on Phase 1 of the project that summarized a condition assessment of the homes and evaluated retrofit options within the constraints of the cooperative provided by GHI. Phase 2 was completed following monitoring in the 2013–2014 winter season; the results are summarized in this report. Phase 3 upgrades of heating equipment will be implemented in time for the 2014–2015 heating season and are not part of this report.

  1. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect (OSTI)

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  2. Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons

    SciTech Connect (OSTI)

    Gordon, John Howard

    2014-09-09

    A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

  3. Financing Energy Efficient Upgrades with ENERGY STAR®

    Office of Energy Efficiency and Renewable Energy (EERE)

    Learn how public sector organizations are improving energy efficiency with innovative solutions to financial barriers. Attendees will learn about financing projects in the public and private...

  4. Software/Electronic Equipment Reimbursed Under Grants Although you may purchase a software upgrade, PDA, laptop, or other electronic items specifically for

    E-Print Network [OSTI]

    Kurapov, Alexander

    Software/Electronic Equipment Reimbursed Under Grants Although you may purchase a software upgrade college-wide activities and functions. OSU general guidelines: Unique Electronic Items & Software, software and other unique electronic items with sponsored project funds must be in conformance with OMB

  5. Webinar: Introduction to Better Buildings Home Upgrade Program Accelerator

    Broader source: Energy.gov [DOE]

    DOE recently launched the new Better Buildings Home Upgrade Program Accelerator that will focus on the adoption of HPXML and other process improvements to reduce administrative costs and improve...

  6. The run IIb trigger upgrade for the DO experiment

    E-Print Network [OSTI]

    Wilson, Graham Wallace; Padley, P.; Olsen, J.; Narain, M.; Mitrevski, J.; Le Du, P.; Laurens, P.; Johnson, M.; Johns, K.; Hirosky, R.; Hildreth, M.

    2004-06-01

    The increase in instantaneous luminosity anticipated in Run IIb of the Tevatron collider at Fermilab requires increased background rejection capabilities from the trigger system of the DO detector. A set of upgrades is under way to improve...

  7. Capturing Energy Efficiency Upgrades in the Real Estate Transaction

    Broader source: Energy.gov [DOE]

    "Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a home’s energy consumption.

  8. Bedford Energizes Other Communities to Upgrade | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Jobs-Green New York Program. The state provided homeowners a 10% rebate on the total cost of the upgrades once completed. Workforce Development: Energize New York created the...

  9. Financing Energy Upgrades for K-12 School Districts

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

  10. What's Working in Residential Energy Efficiency Upgrade Programs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Institute Martha Jane Murray, Clinton Climate Initiative 11:00 a.m. - 12:30 p.m. Driving Demand for Residential Building Upgrades Moderator: David Weitz, Conservation Services...

  11. Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade |...

    Office of Environmental Management (EM)

    as adding insulation and motion sensors. As a result of the upgrades, the Tribe's electrical energy consumption is estimated to be reduced by 30%, thereby reducing the cost to...

  12. Direct Catalytic Upgrading of Current Dilute Alcohol Fermentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Direct Catalytic Upgrading of Current Dilute Alcohol Fermentation Streams to Hydrocarbons for Fungible Fuels 2.3.1.100 Chaitanya Narula, 1 Zhenglong Li, 1 E. Casbeer, 1 Robert A....

  13. Upgrade to the Birmingham Irradiation Facility

    E-Print Network [OSTI]

    Dervan, P; Hodgson, P; Marin- Reyes; Parker, K; Wilson, J; Baca, M

    2015-01-01

    The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 10^15 (1 MeV neutron equivalent (neq)) cm^-2 in 80 s with proton beam currents of 1 ?A and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of 50 1C in 30 min and aims to maintain sub-0 1C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and perform...

  14. Syngas Upgrading to Hydrocarbon Fuels Technology Pathway

    SciTech Connect (OSTI)

    Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

  15. LHCb : Tracking system of the LHCb upgrade

    E-Print Network [OSTI]

    Szumlak, Tomasz

    2015-01-01

    The upgrade of the LHCb experiment will run at an instantaneous luminosity of 2x10^33 cm^-2 s^-1 with a fully software based trigger, allowing to read out the detector at a rate of 40MHz. For this purpose, the full tracking system will be newly developed: the vertex locator (VELO) will be replaced by a pixel-based detector, withstanding the high radiation dose and providing an excellent track reconstruction with an efficiency of above 99% for all charged particles of interest. Upstream of the magnet, a silicon mico-strip detector with a high granularity and an improved acceptance coverage, called the Upstream Tracker (UT), will replace the current silicon strip tracker, and provide a rough momentum estimate. The tracking system downstream of the magnet will be replaced by the Scintillating Fibre tracker (SciFi), which will consist of 12 layers using 2.5m long scintillating fibres read out by silicon photo-multipliers, providing a spatial resolution better than 100 micron and resulting in a total momentum reso...

  16. Naphthene upgrading with pillared synthetic clay catalysts

    SciTech Connect (OSTI)

    Sharma, R.K.; Olson, E.S. [Univ. of North Dakota, Grand Forks, ND (United States)

    1995-12-31

    Catalytic hydrotreatment of methylcyclohexane was investigated to model upgrading of coal-derived naphthenes. Nickel-substituted synthetic mica montmorillonite (NiSMM), alumina-pillared NiSMM and Zirconia-pillared NiSMM were prepared and tested for hydrocracking and hydroisomerization of methylcyclohexane. Infrared and thermal desorption studies of the pyridine-adsorbed catalysts indicated the presence of Lewis and Bronsted acid sites. Total acidity and surface area increased with pillaring of NiSMM with polyoxy aluminum and polyoxy zirconium cations. Methylcyclohexane was reacted with these catalysts under a variety of conditions. Pillared clays gave higher gas yields and higher hydrocracking but lower hydroisomerization activity than nonpillared clay. The majority of the products were branched alkanes (isoparaffinic). These catalysts effectively use hydrogen as indicated by the minimal formation of aromatic hydrocarbons, coke, or other oligomeric materials. The effect of various operating conditions, i.e., reaction temperature, contact time, H{sub 2} pressure, and catalyst, on the product distribution will be described.

  17. Screening of processing and upgrading schemes

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

  18. Optical Link ASICs for the LHC Upgrade

    E-Print Network [OSTI]

    K. K. Gan; H. P. Kagan; R. D. Kass; J. R. Moore; D. S. Smith

    2009-11-23

    We have designed three ASICs for possible applications in the optical links of a new layer of pixel detector in the ATLAS experiment for the first phase of the LHC luminosity upgrade. The ASICs include a high-speed driver for the VCSEL, a receiver/decoder to decode the signal received at the PIN diode to extract the data and clock, and a clock multiplier to produce a higher frequency clock to serialize the data for transmission. These ASICs were designed using a 130 nm CMOS process to enhance the radiation-hardness. We have characterized the fabricated ASICs and the submission has been mostly successful. We irradiated the ASICs with 24 GeV/c protons at CERN to a dosage of 70 Mrad. We observed no significant degradation except the driver circuit in the VCSEL driver fabricated using the thick oxide process in order to provide sufficient voltage to drive a VCSEL. The degradation is due to a large threshold shifts in the PMOS transistors used.

  19. HAWC Upgrade with a Sparse Outrigger Array

    E-Print Network [OSTI]

    Sandoval, A

    2015-01-01

    The High Altitude Water Cherenkov (HAWC) high-energy gamma-ray observatory has recently been completed on the slopes of the Sierra Negra volcano in central Mexico. HAWC consists of 300 Water Cherenkov Detectors, each containing 180 m$^3$ of ultra-purified water, that cover a total surface area of 20,000 m$^2$. It detects and reconstructs cosmic- and gamma-ray showers in the energy range of 100 GeV to 100 TeV. The HAWC trigger for the highest energy gammas reaches an effective area of 10$^5$ m$^2$ but many of them are poorly reconstructed because the shower core falls outside the array. An upgrade that increases the present fraction of well reconstructed showers above 10 TeV by a factor of 3-4 can be done with a sparse outrigger array of small water Cherenkov detectors that pinpoint the core position and by that improve the angular resolution of the reconstructed showers. Such an outrigger array would be of the order of 200 small water Cherenkov detectors of 2.5 m$^3$ placed over an area four times larger than...

  20. NSTX Program Overview andNSTX Program Overview and NSTX Upgrade Physics Design ProgressNSTX Upgrade Physics Design Progress

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    -B318, PPPL NSTXNSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INL in Upgrade 6. Develop normally-conducting radiation-tolerant magnets for ST applications · Desig

  1. A transverse bunch by bunch feedback system for Pohang Light Source upgrade

    SciTech Connect (OSTI)

    Lee, E.-H.; Kim, D.-T.; Huang, J.-Y.; Shin, S.; Nakamura, T.; Kobayashi, K.

    2014-12-15

    The Pohang Light Source upgrade (PLS-II) project has successfully upgraded the Pohang Light Source (PLS). The main goals of the PLS-II project are to increase the beam energy to 3 GeV, increase the number of insertion devices by a factor of two (20 IDs), increase the beam current to 400 mA, and at the same time reduce the beam emittance to below 10 nm by using the existing PLS tunnel and injection system. Among 20 insertion devices, 10 narrow gap in-vacuum undulators are in operation now and two more in-vacuum undulators are to be installed later. Since these narrow gap in-vacuum undulators are most likely to produce coupled bunch instability by the resistive wall impedance and limit the stored beam current, a bunch by bunch feedback system is implemented to suppress coupled bunch instability in the PLS-II. This paper describes the scheme and performance of the PLS-II bunch by bunch feedback system.

  2. Improved Catalysts for Heavy Oil Upgrading Based on Zeolite Y Nanoparticles Encapsulated Stable Nanoporous Host

    SciTech Connect (OSTI)

    Conrad Ingram; Mark Mitchell

    2007-09-30

    The objective of this project is to synthesize nanocrystals of highly acidic zeolite Y nanoclusters, encapsulate them within the channels of mesoporous (nanoporous) silicates or nanoporous organosilicates, and evaluate the 'zeolite Y/Nanoporous host' composites as catalysts for the upgrading of heavy petroleum feedstocks. In comparison to conventionally-used zeolite Y catalysts of micron size particles, the nanocrystals (< 100 nm particle size) which contain shorter path lengths, are expected to allow faster diffusion of large hydrocarbon substrates and the catalysis products within and out of the zeolite's channels and cages (<1 nm size). This is expected to significantly reduce deactivation of the catalyst and to prolong their period of reactivity. Encapsulating zeolite Y nanocrystals within the nanoporous materials is expected to protect its external surfaces and pore entrances from being blocked by large hydrocarbon substrates, since these substrates will initially be converted to small molecules by the nanoporous host (a catalyst in its own right). The project consisted of four major tasks as follows: (1) synthesis of the nanoparticles of zeolite Y (of various chemical compositions) using various techniques such as the addition of organic additives to conventional zeolite Y synthesis mixtures to suppress zeolite Y crystal growth; (2) synthesis of nanoporous silicate host materials of up to 30 nm pore diameter, using poly (alkylene oxide) copolymers which when removed will yield a mesoporous material; (3) synthesis of zeolite Y/Nanoporous Host composite materials as potential catalysts; and (4) evaluation of the catalyst for the upgrading of heavy petroleum feedstocks.

  3. PROJECT STRATEGY FOR THE REMEDIATION AND DISPOSITION OF LEGACY TRANSURANIC WASTE AT THE SAVANNAH RIVER SITE, South Carolina, USA

    SciTech Connect (OSTI)

    Rodriguez, M.

    2010-12-17

    This paper discusses the Savannah River Site Accelerated Transuranic (TRU) Waste Project that was initiated in April of 2009 to accelerate the disposition of remaining legacy transuranic waste at the site. An overview of the project execution strategy that was implemented is discussed along with the lessons learned, challenges and improvements to date associated with waste characterization, facility modifications, startup planning, and remediation activities. The legacy waste was generated from approximately 1970 through 1990 and originated both on site as well as at multiple US Department of Energy sites. Approximately two thirds of the waste was previously dispositioned from 2006 to 2008, with the remaining one third being the more hazardous waste due to its activity (curie content) and the plutonium isotope Pu-238 quantities in the waste. The project strategy is a phased approach beginning with the lower activity waste in existing facilities while upgrades are made to support remediation of the higher activity waste. Five waste remediation process lines will be used to support the full remediation efforts which involve receipt of the legacy waste container, removal of prohibited items, venting of containers, and resizing of contents to fit into current approved waste shipping containers. Modifications have been minimized to the extent possible to meet the accelerated goals and involve limited upgrades to address life safety requirements, radiological containment needs, and handling equipment for the larger waste containers. Upgrades are also in progress for implementation of the TRUPACT III for the shipment of Standard Large Boxes to the Waste Isolation Pilot Plant, the US TRU waste repository. The use of this larger shipping container is necessary for approximately 20% of the waste by volume due to limited size reduction capability. To date, approximately 25% of the waste has been dispositioned, and several improvements have been made to the overall processing plan as well as facility processing rates. These lessons learned, challenges, and improvements will be discussed to aid other sites in their efforts to conduct similar activities.

  4. Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade

    SciTech Connect (OSTI)

    A. Burrill, G.K. Davis, F. Marhauser, C.E. Reece, A.V. Reilly, M. Stirbet

    2011-09-01

    The CEBAF recirculating CW electron linear accelerator at Jefferson Lab is presently undergoing a major upgrade to 12 GeV. This project includes the fabrication, preparation, and testing of 80 new 7-cell SRF cavities, followed by their incorporation into ten new cryomodules for subsequent testing and installation. In order to maximize the cavity Q over the full operable dynamic range in CEBAF (as high as 25 MV/m), the decision was taken to apply a streamlined preparation process that includes a final light temperature-controlled electropolish of the rf surface over the vendor-provided bulk BCP etch. Cavity processing work began at JLab in September 2010 and will continue through December 2011. The excellent performance results are exceeding project requirements and indicate a fabrication and preparation process that is stable and well controlled. The cavity production and performance experience to date will be summarized and lessons learned reported to the community.

  5. Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    SciTech Connect (OSTI)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.

  6. ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC

    E-Print Network [OSTI]

    Valderanis, Chrysostomos; The ATLAS collaboration

    2015-01-01

    ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC The luminosity of the LHC will increase up to 2x10^34 cm-2s-1 after the long shutdown in 2019 (phase-1 upgrade) and up to 7x10^34 cm-2s-1 after the long shutdown in 2025 (phase-2 upgrade). In order to cope with the increased particle fluxes, upgrades are envisioned for the ATLAS muon spectrometer. At phase-1, the current innermost stations of the ATLAS muon endcap tracking system (the Small Wheels) will be upgraded with 2x4-layer modules of Micromega detectors, sandwiched by two 4 layer modules of small strip Thin Gap Chambers on either side. Each 4-layer module of the so-called New Small Wheels covers a surface area of approximately 2 to 3 m2 for a total active area of 1200 m2 each for the two technologies. On such large area detectors, the mechanical precision (30 \\mu m along the precision coordinate and 80 \\mu m along the beam) is a key point and must be controlled and monitored along the process of construction and integration. The design and re...

  7. Project Reports for Central Council of the Tlingit and Haida Indian Tribes of Alaska: Tlingit and Haida Regional Housing Authority- 2011 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Tlingit and Haida Regional Housing Authority (THRHA) will conduct a three-year project to provide energy efficiency audits, energy monitoring, energy usage assessments, and energy conservation proposed upgrades for approximately 51 low-income, multifamily residences (292 units) in 14 southeast Alaska communities and rural communities with extremely high energy costs; identify funding options for potential energy upgrades, if found to be viable, to implement the resultant project.

  8. Proposed Project: Plains & Eastern Clean Line Transmission Line |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity of Natural GasAdjustmentsShirley Ann JacksonDepartment ofOffice|inWest KentuckyRestorationThatThese are the current lists

  9. Upgrade Strategies for the Proton Synchrotron Booster Dump at CERN

    E-Print Network [OSTI]

    Sarrio Martinez, A; Maglioni, C

    2012-01-01

    CERN’s LHC Injection chain Upgrade (LIU) involves a revision of the Proton Synchrotron Booster dump, which was designed in the 1960’s to cope with beam energies reaching 800 MeV and intensities of 1e+13 particles per pulse. Thermo-mechanical studies highlighted the need for an upgrade of the dump, so that it is capable of withstanding energies in the order of 2 GeV and intensities up to 1e+14 particles per pulse. This paper proposes a new design of the dump in the light of various constraints and choices such as the geometry, materials and the integration of the required cooling system. Further topics discussed include the strategy for dismantling the old device, which has been continuously irradiated for almost 40 years and presents a difficult access. Therefore, a detailed ALARA procedure is being prepared in order to carry out the upgrade works in the area.

  10. Reactive plasma upgrade of squalane - a heavy oil simulant

    SciTech Connect (OSTI)

    Kong, P.C.; Watkins, A.D.; Detering, B.A.; Thomas, C.P.

    1995-10-01

    U.S. light crude oil production has steadily declined over the last two decades. However, huge known heavy oil deposits in the North American continent remain largely untapped. In the past 10 years, the API gravity of crude oils has been decreasing by about 0.17% per year, and the sulfur content has been increasing by about 0.027% per year. As the API gravity of crude oil decreases, there will be an urgent need for economically viable new technologies to upgrade the heavy oil to a high API gravity feed stock for the refineries. The Idaho National Engineering Laboratory is investigating an innovative plasma process to upgrade heavy oil and refinery residuum. This paper will present some of the results and the implications of this technology for heavy oil upgrade and conversion.

  11. Flat bunch creation and acceleration: a possible path for the LHC luminosity upgrade

    SciTech Connect (OSTI)

    Bhat, C.M.; /Fermilab

    2009-05-01

    Increasing the collider luminosity by replacing bunches having Gaussian line-charge distribution with flat bunches, but with same beam-beam tune shift at collision, has been studied widely in recent years. But, creation of 'stable' flat bunches (and their acceleration) using a multiple harmonic RF system has not been fully explored. Here, we review our experience with long flat bunches in the barrier RF buckets at Fermilab.We presentsome preliminary results from beam dynamics simulations and recent beam studies in the LHC injectors to create stable flat bunches using double harmonic RF systems. The results deduced from these studies will be used to model the necessary scheme for luminosity upgrade in the LHC. We have also described a viable (and economical) way for creation and acceleration of flat bunches in the LHC. The flat bunch scheme may have many advantages over the LHC baseline scenario, particularly because of the reduced momentum spread of the bunch for increased intensities.

  12. Research Laboratory Experiments with Energy Efficiency Upgrades |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Financing Tool FitsProject DevelopsforReporting OccupationalPower Generation Systems Using

  13. DOE Hanford Network Upgrades and Disaster Recovery Exercise Support the Cleanup Mission Now and into the Future

    SciTech Connect (OSTI)

    Eckman, Todd J.; Hertzel, Ali K.; Lane, James J.

    2013-11-07

    In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligence and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.

  14. Janus Upgrade using brewster angle disk amplifier technology. [Janus laser system

    SciTech Connect (OSTI)

    Hunt, J.; Boben, R.; Blocker, R.; Clark, J.; Henesian, M.; Victoria, J.; Mayo, S.; Patton, H.; Pedersen, K.; Strange, N.; Swain, J.

    1990-10-24

    The Nuclear Test and Experimental Science Program (NTES) has requested that the Laser Program design and price an upgrade to the Janus laser system (JANUS UPGRADE) capable of reliably delivering in excess of 200 joules per beamline in a range of pulse forms to three experiment areas. The facility is to have the following characteristics: three experiment areas, two high energy beams, each with 200--400 joule/1 ns at a wavelength of 1.053 or 1.064 microns, and 125--250 J/1 ns when frequency doubled, one probe beam (0.1 J rated at 30 ps) to be used for interferometry, and reliable operation. The proposed facility would occupy approximately 5600 ft{sup 2} and be located in the Bldg. 174 complex. A block diagram of the entire facility is shown in Fig. 1. The facility is further defined by the Work Breakdown Structure (also shown in Fig. 1). The main elements of the WBS are the conventional facility and modifications thereof (WBS 1), special equipment (WBS 2), the laser (WBS 3), the experiment areas (WBS 4), the controls and data acquisition system (WBS 5), and the project integration (WBS 6). The experiment area has three target chambers and uses diagnostic hardware now in Janus. 12 figs., 4 tabs.

  15. Reactor control system upgrade for the McClellan Nuclear Radiation Center

    E-Print Network [OSTI]

    Power, Michael A.

    1999-01-01

    a new reactor control system for the McClellan NuclearI REACTOR CONTROL SYSTEM UPGRADE FOR THE McCLELLAN NUCLEARReactor Control System Upgrade for the McClellan Nuclear

  16. Hopper OS upgrade and new SW set to default next Wed, Feb 27

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OS upgrade and new SW set to default next Wed, Feb 27 Hopper OS upgrade and new SW set to default next Wed, Feb 27 February 21, 2013 by Helen He (0 Comments) 1) There will be a...

  17. Building Value with Energy-Saving Upgrades in Homes and Businesses...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses July 12, 2011 - 10:09am Addthis Eric Barendsen...

  18. Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County, Loan Loss Reserve Fund Agreement. Example of loan loss reserve agreement.

  19. Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2012-11-01

    The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

  20. Fast and efficient charge breeding of the Californium rare isotope breeder upgrade electron beam ion source

    SciTech Connect (OSTI)

    Ostroumov, P. N.; Barcikowski, A.; Dickerson, C. A.; Perry, A.; Pikin, A. I.; Sharamentov, S. I.; Vondrasek, R. C.; Zinkann, G. P.

    2015-08-28

    The Electron Beam Ion Source (EBIS), developed to breed Californium Rare Isotope Breeder Upgrade (CARIBU) radioactive beams at Argonne Tandem Linac Accelerator System (ATLAS), is being tested off-line. A unique property of the EBIS is a combination of short breeding times, high repetition rates, and a large acceptance. Overall, we have implemented many innovative features during the design and construction of the CARIBU EBIS as compared to the existing EBIS breeders. The off-line charge breeding tests are being performed using a surface ionization source that produces singly charged cesium ions. The main goal of the off-line commissioning is to demonstrate stable operation of the EBIS at a 10 Hz repetition rate and a breeding efficiency into single charge state higher than 15%. These goals have been successfully achieved and exceeded. We have measured (20% ± 0.7%) breeding efficiency into the single charge state of 28+ cesium ions with the breeding time of 28 ms. In general, the current CARIBU EBIS operational parameters can provide charge breeding of any ions in the full mass range of periodic table with high efficiency, short breeding times, and sufficiently low charge-to-mass ratio, 1/6.3 for the heaviest masses, for further acceleration in ATLAS. In this study, we discuss the parameters of the EBIS and the charge breeding results in a pulsed injection mode with repetition rates up to 10 Hz.

  1. Fast and efficient charge breeding of the Californium rare isotope breeder upgrade electron beam ion source

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Ostroumov, P. N.; Barcikowski, A.; Dickerson, C. A.; Perry, A.; Pikin, A. I.; Sharamentov, S. I.; Vondrasek, R. C.; Zinkann, G. P.

    2015-08-28

    The Electron Beam Ion Source (EBIS), developed to breed Californium Rare Isotope Breeder Upgrade (CARIBU) radioactive beams at Argonne Tandem Linac Accelerator System (ATLAS), is being tested off-line. A unique property of the EBIS is a combination of short breeding times, high repetition rates, and a large acceptance. Overall, we have implemented many innovative features during the design and construction of the CARIBU EBIS as compared to the existing EBIS breeders. The off-line charge breeding tests are being performed using a surface ionization source that produces singly charged cesium ions. The main goal of the off-line commissioning is to demonstratemore »stable operation of the EBIS at a 10 Hz repetition rate and a breeding efficiency into single charge state higher than 15%. These goals have been successfully achieved and exceeded. We have measured (20% ± 0.7%) breeding efficiency into the single charge state of 28+ cesium ions with the breeding time of 28 ms. In general, the current CARIBU EBIS operational parameters can provide charge breeding of any ions in the full mass range of periodic table with high efficiency, short breeding times, and sufficiently low charge-to-mass ratio, 1/6.3 for the heaviest masses, for further acceleration in ATLAS. In this study, we discuss the parameters of the EBIS and the charge breeding results in a pulsed injection mode with repetition rates up to 10 Hz.« less

  2. Aalborg Universitet Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel

    E-Print Network [OSTI]

    Vasquez, Juan Carlos

    Aalborg Universitet Reactive Power Support of Electrical Vehicle Charging Station Upgraded of Electrical Vehicle Charging Station Upgraded with Flywheel Energy Storage System," in Proc. IEEE PowerTech, 2015. Reactive Power Support of Electrical Vehicle Charging Station Upgraded with Flywheel Energy

  3. Investment and Upgrade in Distributed Generation under Uncertainty

    E-Print Network [OSTI]

    Guillas, Serge

    for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via.maribu@ensmp.fr 1 #12;Investment and Upgrade under Uncertainty in Distributed Generation 2 Keywords: Combined heat heat exchangers (HXs) to meet local energy loads. Although the electric-only efficiency of DG is lower

  4. THE TCS UPGRADE: DESIGN, CONSTRUCTION, CONDITIONING, AND ENHANCED RMF FRC

    E-Print Network [OSTI]

    Washington at Seattle, University of

    , with relatively low ~by FRC standards! megawatt-level RMF input powers. After initial forma- tion, the plasmaTHE TCS UPGRADE: DESIGN, CONSTRUCTION, CONDITIONING, AND ENHANCED RMF FRC PERFORMANCE K. E. MILLER. MILROY, Z. A. PIETRZYK, and G. C. VLASSES University of Washington Redmond Plasma Physics Laboratory

  5. Technologies for Upgrading Light Water Reactor Outlet Temperature

    SciTech Connect (OSTI)

    Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

    2013-07-01

    Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300°C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

  6. Progress in MPC and A upgrades at Luch

    SciTech Connect (OSTI)

    Mizin, P.; Chukov, V.; Rogatchev, V. [Gosudarstvennyj Nauchno-Issledovatel`skij Inst. NPO Luch, Podol`sk (Russian Federation); Curtiss, J. [Brookhaven National Lab., Upton, NY (United States); Erkkila, B. [Los Alamos National Lab., NM (United States); Goodey, K. [Pacific Northwest National Lab., Richland, WA (United States); Hembree, D. Jr. [Oak Ridge National Lab., TN (United States); Lowe, D. [Sandia National Labs., Albuquerque, NM (United States); Turner, C. [Lawrence Livermore National Lab., CA (United States)

    1997-09-01

    Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch.

  7. A THEORY UPGRADE FOR RHIC: Towards a Quantitative Understanding of

    E-Print Network [OSTI]

    Gustafsson, Torgny

    is of an enabling nature, comparable to the construction and upgrades of facilities and instruments which enable #12;I. The Challenge The RHIC facility provides a unique environment for studying QCD bulk matter, suggesting a strongly coupled medium. Third, large domains in parameter space for the equation of state have

  8. Automating Database Schema Evolution in Information System Upgrades

    E-Print Network [OSTI]

    Zaniolo, Carlo

    Automating Database Schema Evolution in Information System Upgrades Carlo Curino Hyun J. Moon Carlo, and down-time currently created by the database schema evolution process is the source of incessant prob and historical queries for database archives under schema evolution. Keywords Schema Evolution, Database Design

  9. Version 3 June 20, 2015 NSTX Upgrade Program Letter

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    Innovative Diagnostics for FY 2016-2018 Introduction This NSTX Upgrade (NSTX-U)1 Program Letter provides for reducing cost, risk, and development time for practical fusion energy. The ST appears particularly, with its unique properties, thus extends and complements the higher aspect ratio, lower T tokamak

  10. MAINTENANCE, UPGRADE AND VERIFICATION OF OPERATIONAL FORECASTS OF

    E-Print Network [OSTI]

    MAINTENANCE, UPGRADE AND VERIFICATION OF OPERATIONAL FORECASTS OF CLOUD COVER AND WATER VAPOUR Purchase Order 58311/ODG/99/8362/GWI/LET #12;i PREFACE Starting in August 1998, operational forecasts satellite imagery from the Co-operative Institute for Research in the Atmosphere (CIRA) and upper

  11. COCONUT Deliverable D13 Upgraded State of the Art

    E-Print Network [OSTI]

    Schichl, Hermann

    COCONUT Deliverable D13 Upgraded State of the Art Techniques Implemented as Modules July 29, 2003 manual of the COCONUT API Version 2. 2. Name changes #15; In inference engines model was renamed to wnode was taken out of semantics.h and put into the new header #12;le coconut types.h. 4. Additional features Some

  12. COCONUT Deliverable D13 Upgraded State of the Art

    E-Print Network [OSTI]

    Schichl, Hermann

    COCONUT Deliverable D13 Upgraded State of the Art Techniques Implemented as Modules July 29, 2003 of the COCONUT API Version 2. 2. Base class There are four di#11;erent base classes for evaluator programming been implemented in the COCONUT API version 2. In the following I will give a short description of all

  13. RHIC Operation and Plans for Upgrades Wolfram Fischer

    E-Print Network [OSTI]

    Ã? design 10Ã? achieved #12;Wolfram Fischer 7 Achieved parameters Mode No of bunches Ions/bunch [ 1 0 9] enhanced luminosity 60e9 Au intensity design luminosity Beamexperiments #12;Wolfram Fischer 10 RHIC Run-41 RHIC Operation and Plans for Upgrades Wolfram Fischer C-AD Machine Advisory Committee Meeting 10

  14. Post Production Heavy Oil Operations: A Case for Partial Upgrading 

    E-Print Network [OSTI]

    Lokhandwala, Taher

    2012-12-05

    The transportation of heavy oil is a pressing problem. Various methods have been devised to mitigate the reluctance to flow of these highly dense and viscous oils. This study is focused on evaluating a case for post-production partial upgrading...

  15. SEWAGE LAGOON DESIGN USING WETLANDS AND OTHER UPGRADING TECHNOLOGIES

    E-Print Network [OSTI]

    that a total ammonia concentration of 5 mg/L-N be used as a design criteria. In additionto presenting design#12;L L llF L L L SEWAGE LAGOON DESIGN USING WETLANDS AND OTHER UPGRADING TECHNOLOGIES TO ACHIEVE effluents are typically non-toxic. Using an arbitrary factor of safety of two, it is recommended

  16. Low rank coal upgrading in a flow of hot water

    SciTech Connect (OSTI)

    Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura

    2009-09-15

    Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

  17. Navajo Electrification Demonstraiton Project

    SciTech Connect (OSTI)

    Larry Ahasteen, Project Manager

    2006-07-17

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  18. Upgrade of the ATLAS Control and Configuration Software for Run 2

    E-Print Network [OSTI]

    Avolio, Giuseppe; The ATLAS collaboration; Anders, Gabriel; Caprini, Mihai; Corso-Radu, Alina; D'ascanio, Matteo; De Castro Vargas Fernandes, Julio; Dova, Maria-Teresa; Kazarov, Andrei; Klopov, Nikolai; Kolobara, Bernard; Kotov, Vladislav; Lankford, Andrew; Laurent, Florian; Lehmann Miotto, Giovanna; Magnoni, Luca; Olechko, Serguei; Papaevgeniou, Lykourgos; Ryabov, Yury; Santos, Alejandro; Scannicchio, Diana; Seixas, Jose; Soloviev, Igor; Unel, Gokhan; Yasu, Yoshiji

    2015-01-01

    The ATLAS data acquisition (DAQ) system is controlled and configured via a software infrastructure that takes care of coherently orchestrating the data taking. While the overall architecture, established at the end of the 90’s, has proven to be solid and flexible, many software components have undergone a complete redesign or re-implementation in 2013/2014 in order to fold-in the additional requirements that appeared in the course of LHC’s Run 1, to profit from new technologies and to re-factorise and cleanup software. This paper describes the approach that was taken to plan, organise and carry out this software upgrade project. It highlights the main technical choices that have guided the overall work, describes the major achievements and outlines how the control and configuration software may be further improved or re-shaped in the future.

  19. JLab High Efficiency Klystron Baseline Design for 12 GeV Upgrade

    SciTech Connect (OSTI)

    Hovater, J.; Delayen, Jean; Harwood, Leigh; Nelson, Richard; Wang, Haipeng

    2003-05-01

    A computer design of a 13.5 kW, 1497 MHz, CW type, 55% efficiency, 0.8 microPv beam perveance, ~40 dB gain, 5-cavity klystron has been developed for JLab 12 GeV Upgrade project.The design uses TRICOMP codes to simulate the gun, mod-anode section, solenoid focus channel and beam dump. The klystron tube was designed by JPNDISK (1D) code initially and then optimized by MASK (2D) code for the baseline parameters. All of these codes have been bunch marked by JLab 5 kW operational klystrons. The details of design parameters and the simulations by MAFIA (3D) for the cavity couplings tuners, and window are also going to be presented.

  20. SRF CAVITY PERFORMANCE OVERVIEW FOR THE 12 GeV UPGRADE

    SciTech Connect (OSTI)

    A. Burrill, G.K. Davis, C.E. Reece, A.V. Reilly, M. Stirbet

    2012-07-01

    The CEBAF accelerator, a recirculating CW electron accelerator that is currently operating at Jefferson Laboratory, is in the process of having 10 new cryomodules installed to allow for the maximum beam energy to be increased from 6 GeV to 12 GeV. This upgrade required the fabrication, processing and RF qualification of 80, seven cell elliptical SRF cavities, a process that was completed in February 2012. The RF performance achieve in the vertical testing dewars has exceeded the design specification by {approx}25% and is a testament to the cavity design and processing cycle that has been implemented. This paper will provide a summary of the cavity RF performance in the vertical tests, as well as review the overall cavity processing cycle and duration for the project.

  1. NSTX Upgrade Umbrella Arch and Foot Reinforcements, Local Dome Details 1 | P a g e NSTX Upgrade

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    clevis restraint/support. Calculation (Calculation is either documented here or attached) Attached was accomplished.) With recommended reinforcements, the 3/4 inch 316 bolts are acceptable for the upgrade loads in strength by integrating it with the TF strap support. Cognizant Engineer's printed name, signature

  2. FY 2007-09 Project Selection, Section 10 1 Project ID: 1991-019-01

    E-Print Network [OSTI]

    , culvert upgrades, road recontouring, riparian revegetation, off-channel watering, grazing exclusion Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage

  3. Project X functional requirements specification

    SciTech Connect (OSTI)

    Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Kourbanis, I.; Lebedev, V.; Mishra, S.; Nagaitsev, S.; Solyak, N.; Tschirhart, R.; /Fermilab

    2012-05-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  4. Project X functional requirements specification

    E-Print Network [OSTI]

    Holmes, S D; Kephart, R; Kerby, J; Kourbanis, I; Lebedev, V; Mishra, S; Nagaitsev, S; Solyak, N; Tschirhart, R

    2012-01-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  5. Productivity Improvement of a Manual Assembly Line 

    E-Print Network [OSTI]

    Yerasi, Pranavi

    2012-10-19

    The current project addresses the productivity improvement of a manual assembly line by making use of operations analysis in the framework of Lean production. A methodology is proposed that helps to improve the productivity of any production process...

  6. EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado.

  7. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2001 Project Team Faculty: Grace Brush, Geography & Environmental Engineering, Whiting School of Engineering Fellow: Dan Bain, Geography & Environmental Engineering, Whiting School. Through this project, the team proposes to develop a variety of resources: a set of general, web

  8. Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway

    SciTech Connect (OSTI)

    Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

    2013-03-31

    In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

  9. CMS TECHNICAL DESIGN REPORT FOR THE MUON ENDCAP GEM UPGRADE

    E-Print Network [OSTI]

    Colaleo, A; Sharma, A; Tytgat, M

    2015-01-01

    This report describes both the technical design and the expected performance of the Phase-II upgrade, using Gas Electron Multiplier (GEM) detectors, of the first endcap station of the CMS muon system. The upgrade is targeted for the second long shutdown of the CERN LHC and is designed to improve the muon trigger and tracking performance at high luminosity. The GEM detectors will add redundancy to the muon system in the 1.6 technology to operate in the high radiation environment present in that region. The first muon endcap station will be instrumented with a double layer of triple-GEM chambers in the 1.6 < |?| < 2.2 region. The detector front-end electronics uses the custom designed VFAT3 chip to provide both fast input for the level-1 muon trigger ...

  10. Upgrade of Beam Energy Measurement System at BEPC-II

    E-Print Network [OSTI]

    Jian-Yong Zhang; Xiao Cai; Xiao-Hu Mo; Di-Zhou Guo; Jian-Li Wang; Bai-Qi Liu; M. N. Achasov; A. A. Krasnov; N. Yu. Muchnoi; E. E. Pyata; E. V. Mamoshkina; F. A. Harris

    2015-10-28

    The beam energy measurement system is of great importance and profit for both BEPC-II accelerator and BES-III detector. The system is based on measuring the energies of Compton back-scattered photons. Many advanced techniques and precise instruments are employed to realize the highly accurate measurement of positron/electron beam energy. During five year's running period, in order to meet the requirement of data taking and improve the capacity of measurement itself, the upgradation of system is continued, which involve the component reformation of laser and optics subsystem, replacement of view-port of the laser to vacuum insertion subsystem, the purchase of electric cooling system for high purity germanium detector, and the improvement of data acquisition and processing subsystem. The upgrading of system guarantees the smooth and efficient measuring of beam energy at BEPC-II and accommodates the accurate offline energy values for further physics analysis at BES-III.

  11. Upgrade of Beam Energy Measurement System at BEPC-II

    E-Print Network [OSTI]

    Zhang, Jian-Yong; Mo, Xiao-Hu; Guo, Di-Zhou; Wang, Jian-Li; Liu, Bai-Qi; Achasov, M N; Krasnov, A A; Muchnoi, N Yu; Pyata, E E; Mamoshkina, E V; Harris, F A

    2015-01-01

    The beam energy measurement system is of great importance and profit for both BEPC-II accelerator and BES-III detector. The system is based on measuring the energies of Compton back-scattered photons. Many advanced techniques and precise instruments are employed to realize the highly accurate measurement of positron/electron beam energy. During five year's running period, in order to meet the requirement of data taking and improve the capacity of measurement itself, the upgradation of system is continued, which involve the component reformation of laser and optics subsystem, replacement of view-port of the laser to vacuum insertion subsystem, the purchase of electric cooling system for high purity germanium detector, and the improvement of data acquisition and processing subsystem. The upgrading of system guarantees the smooth and efficient measuring of beam energy at BEPC-II and accommodates the accurate offline energy values for further physics analysis at BES-III.

  12. The start-up of the bi-provincial upgrader

    SciTech Connect (OSTI)

    Chase, S. [Husky Oil Operations Ltd., Calgary, Alberta (Canada)

    1995-12-31

    The Bi-Provincial Upgrader is a $1.63 x 10{sup 9} Cdn grass-roots heavy oil upgrading facility located near Lloydminster, Saskatchewan. The facility, which started operation in August 1992, is designed to produce 7300 m{sup 3}/day of 34{degrees}API synthetic crude from 11-15{degrees}API heavy crude oils. The start-up and initial operation of the facility has been a technical success. The facility reached design capacity in a much shorter time than typically reported for the start-up of similar units and has operated reliably at better than design capacity. In this paper, the plant operating performance is reviewed in some detail. A review of the engineering and construction phases and a summary of regional benefits is also included.

  13. Reactive plasma upgrade of squalane - a heavy oil simulant

    SciTech Connect (OSTI)

    Kong, P.C.; Watkins, A.D.; Detering, B.A. [Idaho National Engineering Lab., Idaho Falls, ID (United States)] [and others

    1995-07-01

    U.S. light crude oil production has steadily declined over the last two decades. However, huge known heavy oil deposits in the North American continent remain largely untapped. In the past 10 years, the API gravity of crude oils has been decreasing by about 0.17% per year, and the sulfur content has been increasing by about 0.027% per year. As the API gravity of crude oil decreases, there will be an urgent need for economically viable new technologies to ungrade the heavy oil to a high API gravity feed stock for the refineries. The Idaho National Engineering Laboratory is investigating an innovative plasma process to upgrade heavy oil and refinery residuum. This paper will present some of the results and the implications of this technology for heavy oil upgrade and conversion.

  14. Detector and System Developments for LHC Detector Upgrades

    E-Print Network [OSTI]

    Mandelli, Beatrice; Guida, Roberto; Rohne, Ole; Stapnes, Steinar

    2015-05-12

    The future Large Hadron Collider (LHC) Physics program and the consequent improvement of the LHC accelerator performance set important challenges to all detector systems. This PhD thesis delineates the studies and strategies adopted to improve two different types of detectors: the replacement of precision trackers with ever increasingly performing silicon detectors, and the improvement of large gaseous detector systems by optimizing their gas mixtures and operation modes. Within the LHC tracker upgrade programs, the ATLAS Insertable B-layer (IBL) is the first major upgrade of a silicon-pixel detector. Indeed the overall ATLAS Pixel Detector performance is expected to degrade with the increase of luminosity and the IBL will recover the performance by adding a fourth innermost layer. The IBL Detector makes use of new pixel and front-end electronics technologies as well as a novel thermal management approach and light support and service structures. These innovations required complex developments and Quality Ass...

  15. ALT-II armor tile design for upgraded TEXTOR operation

    SciTech Connect (OSTI)

    Newberry, B.L. [Univ. of Michigan, Ann Arbor, MI (United States); McGrath, R.T.; Watson, R.D. [Sandia National Labs., Albuquerque, NM (United States); Kohlhaas, W.; Finken, K.H. [Kernforschungsanlage Juelich GmbH (Germany). Inst. fuer Plasmaphysik; Noda, N. [National Inst. for Fusion Science, Nagoya (Japan)

    1994-08-01

    The upgrade of the TEXTOR tokamak at KFA Juelich was recently completed. This upgrade extended the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating was increased to a total of 8.0 MW through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles of the full toroidal belt Advanced Limiter Test -- II (ALT-II) were designed for a 5-second operation with total heating of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto the ALT-II by about 300%. Consequently, the graphite armor tiles for the ALT-II had to be redesigned to avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. This redesign took the form of two major changes in the ALT-II armor tile geometry. The first design change was an increase of the armor tile thermal mass, primarily by increasing the radial thickness of each tile from 17 mm to 20 mm. This increase in the radial tile dimension reduces the overall pumping efficiency of the ALT-II pump limiter by about 30%. The reduction in exhaust efficiency is unfortunate, but could be avoided only by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time. The second design change involved redefining the plasma facing surface of each armor tile in order to fully utilize the entire surface area. The incident charged particle heat flux was distributed uniformly over the armor tile surfaces by carefully matching the radial, poloidal and toroidal curvature of each tile to the plasma flow in the TEXTOR boundary layer. This geometry redefinition complicates the manufacturing of the armor tiles, but results in significant thermal performance gains. In addition to these geometry upgrades, several material options were analyzed and evaluated.

  16. Providing protection: Agencies receive funding to repair, upgrade dams 

    E-Print Network [OSTI]

    Wythe, Kathy

    2009-01-01

    by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations passed between... 1944 and 1981. Land rights were acquired from landowners, and local agencies constructed the dams with federal money from NRCS (formerly the Soil Conservation Service). Local sponsors?including cities, counties, local soil and water conservation...

  17. Booster main magnet power supply, present operation and potential future upgrades

    SciTech Connect (OSTI)

    Bajon, E.; Bannon, M.; Marneris, I.; Danowski, G.; Sandberg, J.; Savatteri, S.

    2011-03-28

    The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

  18. Resolution studies and performance evaluation of the LHCb VELO upgrade

    E-Print Network [OSTI]

    Hynds, Daniel Peter McFarlane; Soler, Paul; Parkes, Christopher

    2015-03-25

    The LHCb detector at CERN is scheduled to undergo an upgrade during the second long shutdown of the LHC. As part of this upgrade, the vertex detector (VELO) will be replaced with a new hybrid pixel detector, based on an evolution of the Timepix ASIC. The performance of this detector should improve upon that achieved by the current VELO, in addition to facilitating the complete detector readout at 40 MHz. As part of the preparation for this upgrade, this thesis presents the results of studies carried out on the single hit resolution of silicon hybrid pixel detectors. The development of a particle beam telescope has been carried out to allow these studies, shown to operate with track rates in excess of 45 kHz and with a pointing resolution at the device under test of less than 2 ?m. A wide range of sensor types, thicknesses and resistivities have then been tested under different operating conditions and the results presented, with single hit resolutions varying between 4 ?m and 12 ?m depending on the conditi...

  19. A novel process for upgrading heavy oil emulsions

    SciTech Connect (OSTI)

    Ng, F.T.T.; Rintjema, R.T. [Univ. of Waterloo, Ontario (Canada). Dept. of Chemical Engineering

    1994-12-31

    Canada has extensive reserves of high sulfur heavy oils. These heavy oils are recovered primarily by steam injection techniques. As a result, the heavy oils are obtained as emulsions at well-heads. The heavy oils, being high in sulfur and metals, and low in hydrogen to carbon atomic ratio, require upgrading such as desulfurization and hydrocracking before it can be used in conventional refineries. Conventional emulsion treatment and desulfurization technology require multistage processing. Thus, alternative technologies for processing heavy oil emulsions would be attractive. The authors have recently developed a novel single stage process for upgrading emulsions via activation of water to provide hydrogen in situ for catalytic desulfurization and hydrocracking. Current work is focused on the desulfurization aspect of upgrading, using benzothiophene as the model sulfur compound and molybdic acid as the catalyst. At 340 C and a CO loading pressure of 600 psi, up to 86% sulfur removal was obtained. As well, in situ generated H{sub 2} was found to be more active than externally supplied molecular H{sub 2}. A likely pathway for desulfurization of benzothiophene was via the initial hydrogenation of benzothiophene to dihydrobenzothiophene followed by hydrogenolysis to give ethylbenzene and H{sub 2}S.

  20. Performance of the MAGIC telescopes after the major upgrade

    E-Print Network [OSTI]

    Sitarek, Julian; Colin, Pierre; Mazin, Daniel

    2015-01-01

    MAGIC is a system of two Imaging Atmospheric Cherenkov Telescopes located on the Canary island of La Palma, Spain. During summer 2011 and 2012 it underwent a major upgrade. The main subsystems upgraded were the MAGIC-I camera and its trigger system and the readout system of both telescopes. We use observations of the Crab Nebula taken at low and medium zenith angles to assess the key performance parameters of the MAGIC stereo system. For low zenith angle observations, the standard trigger threshold of the MAGIC telescopes is about 50 GeV. The integral sensitivity for point-like sources with Crab Nebula-like spectra above 220 GeV is (0.66 +/- 0.03)% of Crab Nebula flux in 50 h of observations. The angular resolution, defined as the sigma of a 2-dimensional Gaussian distribution, at energies of a few hundred GeV is below 0.07degree, while the energy resolution is around 16%. We investigate the effect of the systematic uncertainty on the data taken with the MAGIC telescopes after the upgrade. We estimate that th...

  1. Snowflake divertor configuration studies for NSTX-Upgrade

    SciTech Connect (OSTI)

    Soukhanovskii, V A

    2011-11-12

    Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

  2. Case Study: Georgia-Pacific Reduces Outside Fuel Costs and Increases Process Efficiency with Insulation Upgrade Program 

    E-Print Network [OSTI]

    Jackson, D.

    1997-01-01

    A Georgia-Pacific plywood plant located in Madison, Georgia recently decided to insulate their steam lines for energy conservation, improved process efficiency and personnel protection. The goal of the project was to eliminate dependency...

  3. EMAB Briefing on Capital Assets Projects and Operations Activities...

    Office of Environmental Management (EM)

    has: * 2 Line item construction projects: Waste Treatment Plant (WTP) at Hanford and Salt Waste Processing Finishing Plant (SWPF) at Savannah River Site * Capital asset projects...

  4. Redesign and Reconstruction of the Equipment Protection Systems for the Upgrading Front Ends and Beamlines at BSRF

    SciTech Connect (OSTI)

    Xiong Shenshou; Tan Yinglei; Wu Xuehui [Beijing Synchrotron Radiation Laboratory, Institute of High Energy Physics, P. O. Box 918, Branch 2-7, Beijing 100049 (China)

    2007-01-19

    The BEPC(Beijing Electron-Positron Collider) is upgraded to be BEPCII, a two-ring Electron-Positron collider. Due to the construction of the BEPCII and upgrade of the existing front ends and beamlines, all the existing EPSs(Equipment Protection Systems) have to be redesigned and reconstructed at BSRF. All the redesigned EPSs for the upgrading front ends and beamlines are a PLC- and SCADA-based equipment protection and control and monitoring system. The EPSs are used to protect BEPCII two storage rings vacuum against vacuum failures in a beamline, as well as to protect the front-end and beamline components from being damaged by synchrotron radiation. For the high-power wiggler beam lines, a fast movable mask is used to protect the blade of a fast-closing valve from damage when the fast-closing valve is triggered to close, which does not need to dump the electron beam running in BEPCII outer ring. In addition, all redesigned PLC- based EPSs are used to communicate with the same centralized monitoring computer to monitor a variety of parameters from all PLC- based EPS systems. The monitoring computer runs the SCADA (Supervisory Control And Data Acquisition) software with its own web server. Graphical HMI interfaces are used to display a few overall views of all front-end equipment operation status and the further detailed information for each EPS in a different pop-up window. On the web services, the SCADA-based centralized monitoring system provides a web browse function, etc. The design of the reconstructed systems is described in this paper.

  5. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    118 Lower Granite U1 Linkage Upgrade Upgrade the U1 turbine linkage to restore full Kaplan capability. NA 4 NA 4 1.0 9916 9916 Lower Monumental U1 Linkage Refurbishment...

  6. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3120 Lower Granite U1 Linkage Upgrade Upgrade the U1 turbine linkage to restore full Kaplan capability. 7.6 7.6 1.2 9916 9916 Lower Monumental U1 Linkage Refurbishment...

  7. Major Capital Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    118 Lower Granite U1 Linkage Upgrade Upgrade the U1 turbine linkage to restore full Kaplan capability. 7.6 7.6 - 9916 9916 Lower Monumental U1 Linkage Refurbishment...

  8. Hemodynamic Monitoring TRANSTHORACIC LINES

    E-Print Network [OSTI]

    Kay, Mark A.

    and with position changes. 5. All lines should have either heparinized saline or D5W infusing. 6. Avoid infusing the line. 9. Never use LA for infusions or bolus medications. 10. Vigilant observation for AIR. B. Line

  9. Energy Upgrade California in Los Angeles County-- The Flex Path Program

    Broader source: Energy.gov [DOE]

    Energy Upgrade California in Los Angeles County: The Flex Path Program. Provides an overview of the Flex Path Pilot Program, progress and next steps.

  10. Sandia Energy - Upgrades to SNL-EFDC: A Tool to Balance Marine...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Upgrades to SNL-EFDC: A Tool to Balance Marine Hydrokinetic Energy Generation Efficiency with Environmental Response Home Renewable Energy Energy Water Power News News & Events...

  11. CRAD, Safety Basis Upgrade Review (DOE-STD-3009-2014) - May 15...

    Office of Environmental Management (EM)

    1) provides objectives, criteria, and approaches for establishing and maintaining the safety basis at nuclear facilities. CRAD, Safety Basis Upgrade Review (DOE-STD-3009-2014)...

  12. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  13. Flathead Electric Cooperative Facility Geothermal Heat Pump System Upgrade

    Broader source: Energy.gov [DOE]

    Project Will Take Advantage of Abundant Water in Shallow Aquifer. Demonstrate Low Temperature GSHP System Design. Provides a Baseline for Local Industrial Geothermal Project Costs and Benefits.

  14. Boiler Upgrades and Decentralizing Steam Systems Save Water and...

    Office of Environmental Management (EM)

    GSHP demo projects) Credit: Oak Ridge National Lab Data Analysis from Ground Source Heat Pump Demonstration Projects Ground Source Heat Pump System Data Analysis DOE IDIQ...

  15. Calibrating transport lines using LOCO techniques

    SciTech Connect (OSTI)

    Yves Roblin

    2011-09-01

    With the 12GeV upgrade underway at CEBAF, there is a need to re-characterize the beamlines after the modifications made to it to accommodate running at higher energies. We present a linear perturbation approach to calibrating the optics model of transport lines. This method is adapted from the LOCO method in use for storage rings. We consider the effect of quadrupole errors, dipole construction errors as well as beam position monitors and correctors calibrations. The ideal model is expanded to first order in Taylor series of the quadrupole errors. A set of difference orbits obtained by exciting the correctors along the beamline is taken, yielding the measured response matrix. An iterative procedure is invoked and the quadrupole errors as well as beam position monitors and corrector calibration factors are obtained. Here we present details of the method and results of first measurements at CEBAF in early 2011.

  16. Searches for Higgs Boson(s) at the Upgraded Tevatron

    E-Print Network [OSTI]

    Gregorio Bernardi; for the CDF; D0 collaborations

    2005-07-14

    We summarize the status of Higgs boson searches at the upgraded Fermilab Tevatron performed by the DO and CDF collaborations. We report on three categories of searches, namely 1) the search for the Standard Model Higgs boson (p\\bar{p} --> H, WH or ZH, with H --> WW* and/or H --> b\\bar{b}), 2) the search for the minimal supersymmetric Higgs boson using p\\bar{p} --> hb\\bar{b} --> b\\bar{b}b\\bar{b} and p\\bar{p} --> hX --> tau tau X, 3) the search for doubly charged Higgs boson.

  17. FELIX: the detector readout upgrade of the ATLAS experiment

    E-Print Network [OSTI]

    Ryu, Soo; The ATLAS collaboration

    2015-01-01

    After the Phase-I upgrade and onward, the Front-End Link eXchange(FELIX) system will be the interface between the readout system and the detector front-end electronics and trigger electronics at the ATLAS experiment. FELIX will function as a gateway to a commodity switched network which will use standard technologies (Ethernet or Infiniband) to communicate with data collecting and processing components. In this talk the system architecture of FELIX will be described and the testing results of the FELIX demonstrator will be presented

  18. D0 Silicon Upgrade: Lower Cleanroom Roof Quick Load Analysis

    SciTech Connect (OSTI)

    Rucinski, Russ; /Fermilab

    1995-11-17

    This engineering note documents calculations done to determine the margin of safety for the lower clean room roof. The analysis was done to give me a feeling of what the loads, stresses and capacity of the roof is prior to installation and installation work to be done for the helium refrigerator upgrade. The result of this quick look showed that the calculated loads produce stress values and loads at about half the allowables. Based on this result, I do not think that special precautions above personal judgement are required for the installation work.

  19. Network Upgrade for the SLC: Control System Modifications

    SciTech Connect (OSTI)

    Crane, M.; Mackenzie, R.; Sass, R.; Himel, T.; /SLAC

    2011-09-09

    Current communications between the SLAC Linear Collider control system central host and the SLCmicros is built upon the SLAC developed SLCNET communication hardware and protocols. We will describe how the Internet Suite of protocols (TCP/IP) are used to replace the SLCNET protocol interface. The major communication pathways and their individual requirements are described. A proxy server is used to reduce the number of total system TCP/IP connections. The SLCmicros were upgraded to use Ethernet and TCP/IP as well as SLCNET. Design choices and implementation experiences are addressed.

  20. Staged Upgrades - Homeowner-focused Strategies for Encouraging Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo.Hydrogen4EnergySolidof2 SpecialSpent|Staffing forUpgrades over

  1. Staged Upgrades as a Strategy for Residential Energy Efficiency |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo.Hydrogen4EnergySolidof2 SpecialSpent|Staffing forUpgrades

  2. Energy Efficiency Upgrades: Benefiting Homeowners and the Environment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015 Infographic courtesyEducation Data JamDepartment of Energy Upgrades:

  3. County Aims to Save with Upgrades | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels DataEnergy Webinar:IAbout Us » ContactCounty Aims to Save with Upgrades

  4. 340 Facility Secondary Containment and Leak Detection Project W-302 Functional Design Criteria

    SciTech Connect (OSTI)

    Stordeur, R.T.

    1995-03-01

    This functional design criteria for the upgrade to the 340 radioactive liquid waste storage facility (Project W-302) specifically addresses the secondary containment issues at the current vault facility of the 340 Complex. This vault serves as the terminus for the Radioactive Liquid Waste System (RLWS). Project W-302 is necessary in order to bring this portion of the Complex into full regulatory compliance. The project title, ``340 Facility Secondary Containment and Leak Detection``, illustrates preliminary thoughts of taking corrective action directly upon the existing vault (such as removing the tanks, lining the vault, and replacing tanks). However, based on the conclusion of the engineering study, ``Engineering Study of the 300 Area Process Wastewater Handling System``, WHC-SD-WM-ER-277 (as well as numerous follow-up meetings with cognizant staff), this FDC prescribes a complete replacement of the current tank/vault system. This offers a greater array of tanks, and provides greater operating flexibility and ease of maintenance. This approach also minimizes disruption to RLWS services during ``tie-in``, as compared to the alternative of trying to renovate the old vault. The proposed site is within the current Complex area, and maintains the receipt of RLWS solutions through gravity flow.

  5. Upgrade and Certification of the Los Alamos National Laboratory SHENC 2011 - 12270

    SciTech Connect (OSTI)

    Stanfield, S.B.; Villani, M.; Barton, P.T.; Gerlock, C.; Nakazawa, D.; Baumann, R.C.; Mowry, R. [Canberra Industries, Business Unit Nuclear Measurements of AREVA (BUMN), 800 Research Parkway, Meriden, CT 06450 (United States); Harvill, J.P. [Washington TRU Solutions, LLC2 Carlsbad, NM 88220 (United States)

    2012-07-01

    Nondestructive assay measurements of Transuranic (TRU) waste at Los Alamos National Laboratory (LANL) required the addition of a standard waste box (SWB) assay system. A Super High Efficiency Neutron Counter (SHENC) located at Hanford was identified to be relocated to LANL. After careful evaluation of waste streams at LANL, it was determined that the current configuration of the SHENC was not sufficient to quantify certain waste streams. At LANL, there is still a large amount of waste that needs to be retrieved and repackaged within SWB's to meet agreements with the State of New Mexico. Prior to relocating the SHENC, the only assay systems available were High Efficiency Neutron Counters having only a 55-gallon drum capacity. Further analyses indicated that the SHENC system should be capable of quantitative gamma measurements that are to be linked, and combined, with the neutron measurements. The SHENC system was therefore augmented with a new high-resolution gamma spectroscopy system using BE5030 detectors and upgraded gamma electronics. The neutron side of the system was also upgraded with an advanced shift register (JSR-15), an improved Programmable Logic Controller and NDA-2000 software. This report will include calibration of both the neutron and gamma modalities of the SHENC system and how the modality results are combined to produce a single assay result. Preliminary performance results will be discussed based on both mock and real waste measurements. Discussions will also include a complete description of the adjustable parameters as well as the calibration plan, techniques and validations including calibration confirmation based on the Waste Isolation Pilot Plant Waste Acceptance Criteria (WIPP-WAC). The SHENC was successfully upgraded to efficiently measure the complex waste streams at Los Alamos National Laboratory. A new PLC was successfully added to the system for Add-A-Source control. A new shift register was added to the SHENC (JSR-15) which provides more flexibility if replacement is required. The addition of the density based calibration on the gamma modality of the system increases the effectiveness of the SHENC for high alpha-n producing waste. Upgrading the system to new software also helped to standardize the program at Los Alamos. Only one new procedure was initiated for the integration of the SHENC. Add-A-Source measurements were effectively integrated with the system based on the confirmation results and positive results during two Department of Energy Performance Demonstration Program Box Cycles. Total measurement uncertainty estimates were completed for both the gamma modality and the neutron modality of the system. The SHENC was reviewed by both the Department of Energy and the Environmental Protection Agency in 2011. The certification letter for the SHENC was issued on November 16, 2011. With the certification letter issued to the Central Characterization Project the SHENC can perform waste measurements on SWB's at Los Alamos for shipment to WIPP. (authors)

  6. Small Businesses Save Big: A Borrower's Guide To Increase the Bottom Line Using Energy Efficiency (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2015-01-01

    Dollars saved through energy efficiency can directly impact your bottom line. Whether you are planning for a major renovation or upgrading individual pieces of building equipment, these improvements can help reduce operating costs, save on utility bills, and boost profits. This fact sheet provides a guide for small businesses to find the resources to increase the energy efficiency of their buildings.

  7. Cost increases at fusion project going critical David Kramer

    E-Print Network [OSTI]

    be used to upgrade biofuels to higher energy content or to reduce CO2 Cost increases at fusion project going critical David Kramer Citation: Phys. Today 66(7), 24 (2013 Physics Today www.physicstoday.org issues and events H ow much will it cost to build what could well

  8. Plains and Eastern Clean Line Transmission Line: Comment from...

    Energy Savers [EERE]

    Plains and Eastern Clean Line Transmission Line: Comment from Marshall Hughes Plains and Eastern Clean Line Transmission Line: Comment from Marshall Hughes Comment submitted on...

  9. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Environmental Management (EM)

    from Block Plains and Eastern Clean Line: Arkansas and Oklahoma Plains and Eastern Clean Line Transmission Line: Comment from Block Plains and Eastern Clean Line: Arkansas and...

  10. Upgrade of the electron beam ion trap in Shanghai

    SciTech Connect (OSTI)

    Lu, D.; Yang, Y.; Xiao, J.; Shen, Y.; Fu, Y.; Wei, B.; Yao, K.; Hutton, R.; Zou, Y., E-mail: zouym@fudan.edu.cn [The Key Lab of Applied Ion Beam Physics, Ministry of Education, 200433 Shanghai (China); Shanghai EBIT Lab, Institute of Modern Physics, Fudan University, 200433 Shanghai (China)

    2014-09-15

    Over the last few years the Shanghai electron beam ion trap (EBIT) has been successfully redesigned and rebuilt. The original machine, developed under collaboration with the Shanghai Institute of Applied Physics, first produced an electron beam in 2005. It could be tuned with electron energies between 1 and 130 keV and beam current up to 160 mA. After several years of operation, it was found that several modifications for improvements were necessary to reach the goals of better electron optics, higher photon detection, and ion injection efficiencies, and more economical running costs. The upgraded Shanghai-EBIT is made almost entirely from Ti instead of stainless steel and achieves a vacuum of less than 10{sup ?10} Torr, which helps to minimize the loss of highly changed ions through charge exchange. Meanwhile, a more compact structure and efficient cryogenic system, and excellent optical alignment have been of satisfactory. The magnetic field in the central trap region can reach up till 4.8 T with a uniformity of 2.77 × 10{sup ?4}. So far the upgraded Shanghai-EBIT has been operated up to an electron energy of 151 keV and a beam current of up to 218 mA, although promotion to even higher energy is still in progress. Radiation from ions as highly charged as Xe{sup 53+,} {sup 54+} has been produced and the characterization of current density is estimated from the measured electron beam width.

  11. Operation of the Upgraded ATLAS Level-1 Central Trigger System

    E-Print Network [OSTI]

    Glatzer, Julian Maximilian Volker; The ATLAS collaboration

    2015-01-01

    The ATLAS Level-1 Central Trigger (L1CT) system is a central part of ATLAS data-taking and has undergone a major upgrade for Run 2 of the LHC, in order to cope with the expected increase of instantaneous luminosity of a factor of 2 with respect to Run 1. The upgraded hardware offers more flexibility in the trigger decisions due to the double amount of trigger inputs and usable trigger channels. It also provides an interface to the new topological trigger system. Operationally - particularly useful for commissioning, calibration and test runs - it allows concurrent running of up to 3 different sub-detector combinations. In this contribution, we give an overview of the operational software framework of the L1CT system with particular emphasis of the configuration, controls and monitoring aspects. The software framework allows a consistent configuration with respect to the ATLAS experiment and the LHC machine, upstream and downstream trigger processors, and the data acquisition. Trigger and dead-time rates are m...

  12. Operation of the Upgraded ATLAS Level-1 Central Trigger System

    E-Print Network [OSTI]

    Glatzer, Julian Maximilian Volker; The ATLAS collaboration

    2015-01-01

    The ATLAS Level-1 Central Trigger (L1CT) system is a central part of ATLAS data-taking and has undergone a major upgrade for Run 2 of the LHC, in order to cope with the expected increase of instantaneous luminosity of a factor of 2 with respect to Run 1. The upgraded hardware offers more flexibility in the trigger decisions due to the double amount of trigger inputs and usable trigger channels. It also provides an interface to the new topological trigger system. Operationally - particularly useful for commissioning, calibration and test runs - it allows concurrent running of up to 3 different subdetector combinations. An overview of the operational software framework of the L1CT system with particular emphasis of the configuration, controls and monitoring aspects is given. The software framework allows a consistent configuration with respect to the ATLAS experiment and the LHC machine, upstream and downstream trigger processors, and the data acquisition. Trigger and dead-time rates are monitored coherently at...

  13. Analysis of NSTX Upgrade OH Magnet and Center Stack

    SciTech Connect (OSTI)

    A. Zolfaghari, P. Titus, J. Chrzanowski, A. Salehzadeh, F. Dahlgren

    2010-11-30

    The new ohmic heating (OH) coil and center stack for the National Spherical Torus Experiment (NSTX) upgrade are required to meet cooling and structural requirements for operation at the enhanced 1 Tesla toroidal field and 2 MA plasma current. The OH coil is designed to be cooled in the time between discharges by water flowing in the center of the coil conductor. We performed resistive heating and thermal hydraulic analyses to optimize coolant channel size to keep the coil temperature below 100 C and meet the required 20 minute cooling time. Coupled electromagnetic, thermal and structural FEA analyses were performed to determine if the OH coil meets the requirements of the structural design criteria. Structural response of the OH coil to its self-field and the field from other coils was analyzed. A model was developed to analyze the thermal and electromagnetic interaction of centerstack components such as the OH coil, TF inner legs and the Bellville washer preload mechanism. Torsional loads from the TF interaction with the OH and poloidal fields are transferred through the TF flag extensions via a torque transfer coupling to the rest of the tokamak structure. A 3D FEA analysis was performed to qualify this design. The results of these analyses, which will be presented in this paper, have led to the design of OH coil and centerstack components that meet the requirements of the NSTX-upgrade structural design criteria.

  14. Post Retort, Pre Hydro-treat Upgrading of Shale Oil

    SciTech Connect (OSTI)

    Gordon, John

    2012-09-30

    Various oil feedstocks, including oil from oil shale, bitumen from tar sands, heavy oil, and refin- ery streams were reacted with the alkali metals lithium or sodium in the presence of hydrogen or methane at elevated temperature and pressure in a reactor. The products were liquids with sub- stantially reduced metals, sulfur and nitrogen content. The API gravity typically increased. Sodi- um was found to be more effective than lithium in effectiveness. The solids formed when sodium was utilized contained sodium sulfide which could be regenerated electrochemically back to so- dium and a sulfur product using a "Nasicon", sodium ion conducting membrane. In addition, the process was found to be effective reducing total acid number (TAN) to zero, dramatically reduc- ing the asphaltene content and vacuum residual fraction in the product liquid. The process has promise as a means of eliminating sulfur oxide and carbon monoxide emissions. The process al- so opens the possibility of eliminating the coking process from upgrading schemes and upgrad- ing without using hydrogen.

  15. The upgrade of the LHCb Vertex Locator (VELO)

    E-Print Network [OSTI]

    van Beuzekom, M

    2014-01-01

    The upgrade of the LHCb experiment, planned for 2018, will enable the detector to run at a luminosity of 2 x 10$^{33}$ cm$^{-22}$s$^{-1}$ and explore New Physics effects in the beauty and charm sector with unprecedented precision. To achieve this, the entire readout will be transformed into a triggerless system operating at 40 MHz, where the event selection algorithms will be executed by high-level software in the CPU farm. The upgraded silicon vertex detector (VELO) must be lightweight, radiation hard, vacuum compatible, and has to drive data to the data acquisition system at speeds of up to 3 Tbit/s. This challenge will be met with a new VELO design based on hybrid pixel detectors, positioned to within 5 mm of the LHC colliding beams. The sensors have 55 x 55 $\\mu$m$^2$ square pixels and the VeloPix ASIC, which is being developed for the readout, is based on the Timepix/Medipix family of chips. The hottest ASIC will have to cope with integrated hit rates of up to 900 MHz which translates to a bandwidth of m...

  16. RF Power Upgrade for CEBAF at Jefferson Laboratory

    SciTech Connect (OSTI)

    Andrew Kimber,Richard Nelson

    2011-03-01

    Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

  17. Q-Sync Motors in Commercial Refrigeration. Preliminary Test Results and Projected Benefits

    SciTech Connect (OSTI)

    Fricke, Brian A.; Becker, Bryan R.

    2015-09-01

    This report provides background information on various fractional-horsepower electric motor technologies, summarizes initial data from a DOE-sponsored Q-Sync motor demonstration project, and extrapolates that data to project the potential economic and environmental benefits resulting from upgrading the current installed base of 9–12 W evaporator fan motors to Q-Sync motors.

  18. Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating

    E-Print Network [OSTI]

    Cui, Yi

    Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating, Stanford, California 94305, United States *S Supporting Information ABSTRACT: Heavy crude oil can that by using carbon nano- catalysts, heavy crude oil can be efficiently upgraded to lighter oil at a relatively

  19. CFD Simulation of Catalytic Upgrading of Pyrolytic Vapours in FCC Riser

    E-Print Network [OSTI]

    -treatment of pyrolysis vapor; Design of catalyst (Red mud) Aqueous phase HDO upgrading of pre-treated bio-oil. ProcessCFD Simulation of Catalytic Upgrading of Pyrolytic Vapours in FCC Riser Prof Sai Gu, Centre/pre- commercial · Quality: Produced oil not suitable for transportation fuels: high oxygen, acidity and reactivity

  20. Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion 

    E-Print Network [OSTI]

    Huseynzade, Samir

    2009-05-15

    In-situ upgrading of oil using hydrogen donors is a new process. In particular, very little research has been conducted with respect to in-situ oil upgrading using hydrogen donor under in-situ combustion. Several papers describe the use of metal...

  1. Proactive Price Regulation for Upgrading Telecommunications Infrastructure and Jon M. Peha

    E-Print Network [OSTI]

    Peha, Jon M.

    1 Proactive Price Regulation for Upgrading Telecommunications Infrastructure Qiong Wang 1 and Jon M that upgrade occurs. This paper discusses a proactive pricing approach in which the regulator defines a pricing, and specify a proactive pricing policy to induce that timing. We also demonstrate a tradeoff between promoting

  2. New Metallization Technique Suitable for 6-MW Pilot Production of Efficient Multicrystalline Solar Cells Using Upgraded Metallurgical Silicon: Final Technical Progress Report, December 17, 2007-- June 16, 2009

    Broader source: Energy.gov [DOE]

    This report describes CaliSolar's work as a Photovoltaic Technology Incubator awardee within the U.S. Department of Energy's Solar Energy Technologies Program. The term of this subcontract with the National Renewable Energy Laboratory was two years. During this time, CaliSolar evolved from a handful of employees to over 100 scientists, engineers, technicians, and operators. On the technical side, the company transitioned from a proof-of-concept through pilot-scale to large-scale industrial production. A fully automated 60-megawatt manufacturing line was commissioned in Sunnyvale, California. The facility converts upgraded metallurgical-grade silicon feedstock to ingots, wafers, and high-efficiency multicrystalline solar cells.

  3. New Metallization Technique Suitable for 6-MW Pilot Production of Efficient Multicrystalline Solar Cells Using Upgraded Metallurgical Silicon: Final Technical Progress Report, December 17, 2007 -- June 16, 2009

    SciTech Connect (OSTI)

    Ounadjela, K.; Blosse, A.

    2010-08-01

    This report describes CaliSolar's work as a Photovoltaic Technology Incubator awardee within the U.S. Department of Energy's Solar Energy Technologies Program. The term of this subcontract with the National Renewable Energy Laboratory was two years. During this time, CaliSolar evolved from a handful of employees to over 100 scientists, engineers, technicians, and operators. On the technical side, the company transitioned from a proof-of-concept through pilot-scale to large-scale industrial production. A fully automated 60-megawatt manufacturing line was commissioned in Sunnyvale, California. The facility converts upgraded metallurgical-grade silicon feedstock to ingots, wafers, and high-efficiency multicrystalline solar cells.

  4. Searchlight Wind Energy Project FEIS Appendix F

    Office of Environmental Management (EM)

    F Page | F 22B Appendix F: Literature Review of Socioeconomic Effects of Wind Project and Transmission Lines Searchlight Wind Energy Project FEIS Appendix F Page | 1 Prepared for"...

  5. REFURBISHMENT AND UPGRADE OF FE BOLTZMANN/RAYLEIGH TEMPERATURE LIDAR AT BOULDER FOR A MCMURDO LIDAR CAMPAIGN IN ANTARCTICA

    E-Print Network [OSTI]

    Chu, Xinzhao

    REFURBISHMENT AND UPGRADE OF FE BOLTZMANN/RAYLEIGH TEMPERATURE LIDAR AT BOULDER FOR A MCMURDO LIDAR conditions, refurbishment and upgrade of the system was necessary in order to restore its performance. More

  6. Proposal to negotiate two contracts, without competitive tendering, for the supply and upgrade of cooling water pumps for the LHC

    E-Print Network [OSTI]

    2012-01-01

    Proposal to negotiate two contracts, without competitive tendering, for the supply and upgrade of cooling water pumps for the LHC

  7. Assessment of Scrape-Off Layer Simulations with Drifts Against L-mode Experiments in ASDEX Upgrade and JET

    E-Print Network [OSTI]

    Assessment of Scrape-Off Layer Simulations with Drifts Against L-mode Experiments in ASDEX Upgrade and JET

  8. Pipe line companies to install 14,766 miles of lines in 1994

    SciTech Connect (OSTI)

    Ives, G. Jr.

    1994-01-01

    This paper reviews the historical and projected pipeline construction activities in the US and around the world. It gives mileage values for all types of oil and gas transmission lines, both on and offshore. Tables provides information on the diameters of these pipelines and information on compressor stations planned and constructed. Known major construction projects are listed by company name with a brief description of the proposed project.

  9. THE BNL SUPER NEUTRINO BEAM PROJECT.

    SciTech Connect (OSTI)

    RAPARIA,D.

    2005-01-26

    BNL plans to create a very long base line super neutrino beam facility by upgrading the AGS from the current 0.14 MW to 1.0 MW and beyond. The proposed facility consists of three major components. First is a 1.5 GeV superconducting linac to replace the booster as injector for the AGS, second is the performance upgrade of the AGS itself for higher intensity and repetition rate, and finally is the target and horn system for the neutrino production. The major contribution for the higher power is from the increase of the repetition rate of the AGS from 0.3 Hz to 2.5 Hz, with moderate increase from the intensity. The accelerator design considerations to achieve high intensity and low losses for the new linac and the AGS will be presented. The target and horn design for high power operation and easy maintenance will also be covered.

  10. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-04-01

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  11. Boron-10 Lined Proportional Counter Wall Effects

    SciTech Connect (OSTI)

    Siciliano, Edward R.; Kouzes, Richard T.

    2012-05-01

    The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project 'Coincidence Counting With Boron-Based Alternative Neutron Detection Technology' at Pacific Northwest National Laboratory (PNNL) for development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube based system in the configuration of a coincidence counter. This report provides information about how variations in proportional counter radius and gas pressure in a typical coincident counter design might affect the observed signal from boron-lined tubes. A discussion comparing tubes to parallel plate counters is also included.

  12. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  13. Jefferson Lab Upgrade named near-term priority in Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are proposing will secure American pre-eminence in science for the better part of the 21st century." The plan prioritized a total of 28 projects, culled from the 53 projects...

  14. ENERGY EFFICIENCY UPGRADES FOR SANITATION FACILITIES IN SELAWIK, AK FINAL REPORT

    SciTech Connect (OSTI)

    POLLIS, REBECCA

    2014-10-17

    The Native Village of Selawik is a federally recognized Alaskan tribe, located at the mouth of the Selawik River, about 90 miles east of Kotzebue in northwest Alaska. Due to the community’s rural location and cold climate, it is common for electric rates to be four times higher than the cost urban residents pay. These high energy costs were the driving factor for Selawik pursuing funding from the Department of Energy in order to achieve significant energy cost savings. The main objective of the project was to improve the overall energy efficiency of the water treatment/distribution and sewer collection systems in Selawik by implementing the retrofit measures identified in a previously conducted utility energy audit. One purpose for the proposed improvements was to enable the community to realize significant savings associated with the cost of energy. Another purpose of the upgrades was to repair the vacuum sewer system on the west side of Selawik to prevent future freeze-up problems during winter months.

  15. Performance studies of resistive Micromegas chambers for the upgrade of the ATLAS Muon Spectrometer

    E-Print Network [OSTI]

    Ntekas, Konstantinos; The ATLAS collaboration

    2015-01-01

    The ATLAS collaboration at LHC has endorsed the resistive Micromegas technology (MM), along with the small-strip Thin Gap Chambers (sTGC), for the high luminosity upgrade of the first muon station in the high-rapidity region, the so called New Small Wheel (NSW) project. The NSW requires fully efficient MM chambers, up to a particle rate of $\\sim15\\,\\mathrm{kHz/cm^2}$, with spatial resolution better than $100\\,\\mu\\mathrm{m}$ independent of the track incidence angle and the magnetic field ($B \\leq 0.3\\,\\mathrm{T}$). Along with the precise tracking the MM should be able to provide a trigger signal, complementary to the sTGC, thus a decent timing resolution is required. Several tests have been performed on small ($10\\times10\\,\\mathrm{cm^2}$) MM chambers using medium ($10\\,\\mathrm{GeV/c}$, PS) and high ($150\\,\\mathrm{GeV/c}$, SPS) momentum hadron beams at CERN. Results on the efficiency and position resolution measured during these tests are presented demonstrating the excellent characteristics of the MM that fulf...

  16. Tagged Neutron, Anti-neutron and K-Long beams in an Upgraded MIPP Spectrometer

    E-Print Network [OSTI]

    Rajendran Raja

    2007-01-23

    The MIPP experiment operating with an upgraded data acquisition system will be capable of acquiring data at the rate of 3000 events per second. Currently we are limited to a rate of 30 Hz due to the bottlenecks in the data acquisition electronics of the Time Projection Chamber (TPC). With the speeded up DAQ, MIPP will be capable of acquiring data at the rate of $\\approx$5 million events per day. This assumes a conservative beam duty cycle of 4~sec spill every 2 minutes with a 42% downtime for main injector beam manipulations for the $\\bar{p}$ source. We show that such a setup is capable of producing tagged neutron, anti-neutron and $K^0_L$ beams that are produced in the MIPP cryogenic hydrogen target using proton, anti-proton and $K^{\\pm}$ beams. These tagged beams can be used to study calorimeter responses for use in studies involving the Particle Flow Algorithm (PFA). The energy of these tagged beams will be known to better than 2% on a particle by particle level by means of constrained fitting. We expect a tagged beam rate in the tens of thousands a day. The MIPP spectrometer thus offers a unique opportunity to study the response of calorimeters to neutral particles.

  17. Upgrade of the cryogenic CERN RF test facility

    SciTech Connect (OSTI)

    Pirotte, O.; Benda, V.; Brunner, O.; Inglese, V.; Maesen, P.; Vullierme, B.; Koettig, T.

    2014-01-29

    With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.

  18. NEUTRON RADIOGRAPHY (NRAD) REACTOR 64-ELEMENT CORE UPGRADE

    SciTech Connect (OSTI)

    John D. Bess

    2014-03-01

    The neutron radiography (NRAD) reactor is a 250 kW TRIGA (registered) (Training, Research, Isotopes, General Atomics) Mark II , tank-type research reactor currently located in the basement, below the main hot cell, of the Hot Fuel Examination Facility (HFEF) at the Idaho National Laboratory (INL). It is equipped with two beam tubes with separate radiography stations for the performance of neutron radiography irradiation on small test components. The interim critical configuration developed during the core upgrade, which contains only 62 fuel elements, has been evaluated as an acceptable benchmark experiment. The final 64-fuel-element operational core configuration of the NRAD LEU TRIGA reactor has also been evaluated as an acceptable benchmark experiment. Calculated eigenvalues differ significantly (approximately +/-1%) from the benchmark eigenvalue and have demonstrated sensitivity to the thermal scattering treatment of hydrogen in the U-Er-Zr-H fuel.

  19. THE SNS VACUUM CONTROL SYSTEM UPGRADE FOR THE SUPERCONDUCTING LINAC

    SciTech Connect (OSTI)

    Williams, Derrick C [ORNL] [ORNL

    2009-01-01

    The superconducting linac of the Spallation Neutron Source (SNS) has 23 cryomodules whose vacuum system is monitored and controlled by custom built hardware. The original control hardware was provided by Thomas Jefferson National Accelerator Facility (JLab) and contained a variety of custom boards utilizing integrated circuits to perform logic. The need for control logic changes, a desire to increase maintainability, and a desire to increase flexibility to adapt for the future has led to a Programmable Logic Controller (PLC) based upgrade. This paper provides an overview of the commercial off-the-shelf (COTS) hardware being used in the superconducting vacuum control system. Details of the design and challenges to convert a control system during small windows of maintenance periods without disrupting beam operation will be covered in this paper.

  20. Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade

    SciTech Connect (OSTI)

    Josh A. Salmond

    2009-08-07

    The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and low residual stresses. The products fabricated are used on multiple programs.

  1. PXIE: Project X Injector Experiment

    SciTech Connect (OSTI)

    Ostroumov, P.N.; /Argonne; Holmes, S.D.; Kephart, R.D.; Kerby, J.S.; Lebedev, V.A.; Mishra, C.S.; Nagaitsev, S.; Shemyakin, A.V.; Solyak, N.; Stanek, R.P.; /Fermilab; Li, D.; /LBL, Berkeley

    2012-05-01

    A multi-MW proton facility, Project X, has been proposed and is currently under development at Fermilab. We are planning a program of research and development aimed at integrated systems testing of critical components comprising the front end of the Project X. This program is being undertaken as a key component of the larger Project X R&D program. The successful completion of this program will validate the concept for the Project X front end, thereby minimizing a primary technical risk element within Project X. Integrated systems testing, known as the Project X Injector Experiment (PXIE), will be accomplished with a new test facility under construction at Fermilab and will be completed over the period FY12-16. PXIE will include an H{sup -} ion source, a CW 2.1-MeV RFQ and two superconductive RF (SRF) cryomodules providing up to 25 MeV energy gain at an average beam current of 1 mA (upgradable to 2 mA). Successful systems testing will also demonstrate the viability of novel front end technologies that are expected find applications beyond Project X.

  2. Nuclear materials control and accountability criteria for upgrades measures

    SciTech Connect (OSTI)

    Erkkila, B.H.; Hatcher, C.R.

    1998-11-01

    As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force.

  3. Racing line optimization

    E-Print Network [OSTI]

    Xiong, Ying, S.M. Massachusetts Institute of Technology

    2010-01-01

    Although most racers are good at controlling their cars, world champions are always talented at choosing the right racing line while others mostly fail to do that. Optimal racing line selection is a critical problem in car ...

  4. Department of Energy Review of the National Spherical Torus Experiment (NSTX) Upgrade Project

    E-Print Network [OSTI]

    Princeton Plasma Physics Laboratory

    -903-0269 stephen.meador@science.doe.gov Review Committee Subcommittee 1: Technical *Tom McManamy, ORNL 865@fnal.gov Subcommittee 3: Cost and Schedule *Kin Chao, DOE/SC 301-903-4116 kin.chao@science.doe.gov Tim Maier, DOE/BHSO 631-344-2402 tmaier@bnl.gov Darren Morton, DOE/OECM 202-287-1940 darren.morton@hq.doe.gov Mark

  5. EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana

    Broader source: Energy.gov [DOE]

    This EIS has been cancelled. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/M2W/.

  6. Refinery Upgrading of Hydropyrolysis Oil from Biomass Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy BillsNo. 195 - Oct. 7,DOERTI |Service ofConditioning FilterReferenceRefinery

  7. Novel Electro-Deoxygenation Process Presentation for Bio Oil Upgrading for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURINGEnergy Bills and Reduce CarbonEnergyDepartment13 FederalJuly 28,1 24, 2015

  8. Catalytic Upgrading of Pyrolysis Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels| Departmentof5.4.407.Cascade reactionsUsingMeeting: May01 DOE0

  9. Catalytic Upgrading of Thermochemical Intermediates to Hydrocarbons Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels| Departmentof5.4.407.Cascade reactionsUsingMeeting: May01

  10. Bio-oil Upgrading with Novel Low Cost Catalysts Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels Researchof Energy| DepartmentofEnergyiT1(BILIWG),Bio-Oil is

  11. Biological Pyrolysis Oil Upgrading Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based Fuels Researchof Energy|Make FuelsBioindustry Creates

  12. J.R. Simplot: Burner Upgrade Project Improves Performance and Saves Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURING OFFICE INDUSTRIALU.S. Department of(Presentation)Irving5: HowU N E 2 0 1 1 A P

  13. Liquid Fuels via Upgrading of Syngas Intermediates Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankADVANCED MANUFACTURING OFFICE INDUSTRIALU.S.Leadership on CleanUp GeorgiaLinacLiquefaction andMay

  14. Electrochemical Methods of Upgrading Pyrolysis Oils Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|DepartmentStatementofAprilof EnergyBreakout SessionElectrochemicalDOE

  15. Fractionation and Catalytic Upgrading of Bio-Oil Presentation BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum12, 2015ExecutiveFluorescent LampFort Collins,47328 Vol. 77, No. 153 March, 2015

  16. Upgrading of Biomass Fast Pyrolysis Oil (Bio-oil) Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on DeliciousMathematics And Statistics » USAJobs Search USAJobs Search TheChlamydomonas reinhardtiiUpdating the

  17. Development of Edgeless Silicon Pixel Sensors on p-type substrate for the ATLAS High-Luminosity Upgrade

    E-Print Network [OSTI]

    Calderini, G; Bomben, M; Boscardin, M; Bosisio, L; Chauveau, J; Giacomini, G; La Rosa, A; Marchiori, G; Zorzi, N

    2015-01-01

    In view of the LHC upgrade for the high luminosity phase (HL-LHC), the ATLAS experiment is planning to replace the inner detector with an all-silicon system. The n-in-p bulk technology represents a valid solution for the modules of most of the layers, given the significant radiation hardness of this option and the reduced cost. The large area necessary to instrument the outer layers will demand to tile the sensors, a solution for which the inefficient region at the border of each sensor needs to be reduced to the minimum size. This paper reports on a joint R&D project by the ATLAS LPNHE Paris group and FBK Trento on a novel n-in-p edgeless planar pixel design, based on the deep-trench process available at FBK.

  18. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  19. Conceptual design of a 2 tesla superconducting solenoid for the Fermilab D{O} detector upgrade

    SciTech Connect (OSTI)

    Brzezniak, J.; Fast, R.W.; Krempetz, K.

    1994-05-01

    This paper presents a conceptual design of a superconducting solenoid to be part of a proposed upgrade for the D0 detector. This detector was completed in 1992, and has been taking data since then. The Fermilab Tevatron had scheduled a series of luminosity enhancements prior to the startup of this detector. In response to this accelerator upgrade, efforts have been underway to design upgrades for D0 to take advantage of the new luminosity, and improvements in detector technology. This magnet is conceived as part of the new central tracking system for D0, providing a radiation-hard high-precision magnetic tracking system with excellent electron identification.

  20. European refiners must seek creative processes to justify heavy-ends projects

    SciTech Connect (OSTI)

    Hunt, P. [Chem Systems Ltd., London (United Kingdom)

    1996-12-09

    There are strong reasons for wanting to upgrade the bottom of the crude oil barrel. But European refiners will not find it easy to get approval and funding for major capital investment projects. In most cases, investment justification will have to be creative and may need to rely on factors traditionally considered to be outside the conventional refinery fence. Examples of such creative upgrading schemes are those employed in four gasification projects planned for refineries in Italy. It is clear that the major obstacles to heavy residue processing are not technical, but economic. A review of these obstacles will set the stage for European investment in bottom-of-the-barrel processing.

  1. Hydropower Upgrades to Yield Added Generation at Average Costs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Related Articles Tacoma Power's Cushman Hydroelectric Project installed a new two-generator powerhouse that increases electric generation capacity by 3.6 megawatts and captures...

  2. EA-1697: San Joaquin Valley Right-of-Way Project, California

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of right-of-way maintenance (including facility inspection and repair, vegetation management, and equipment upgrades for transmission lines and associated rights-or-way, access roads, substations, and a maintenance facility) in the San Joaquin Valley in California.

  3. EIS-0116-S1: Final Supplemental Environmental Impact Statement for the Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project, Grand and Summit Counties, Colorado

    Broader source: Energy.gov [DOE]

    This supplemental environmental impact statement by the Western Area Power Administration assesses the environmental effects of constructing, operating, and maintaining about 30 miles of 230/345-kV transmission line between the existing Gore Pass Substation northwest of Kremmling, Colorado, and a proposed new substation (not part of this action) near the Ute Pass Road. Alternatives assessed included routing and design alternatives plus the alternatives addressed in the Hayden-Blue River Final EIS, issued by the Rural Electrification Administration in July 1982 and adopted by DOE in June 1985 (see DOE/EIS-0116).

  4. A recommended course of action for upgrading Garduda Operations Control Systems

    E-Print Network [OSTI]

    Mathaisel, Dennis F. X.

    1995-01-01

    Introduction: The purpose of this document is to construct a recommended course of action in the next year for Garuda Operations Control in its efforts to upgrade its information systems technology. The process of installing ...

  5. EA-1247: Electrical Power System Upgrades at Los Alamos National Laboratory, Los Alamos, New Mexico

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts for the proposal to upgrade the electrical power supply system for the U.S. Department of Energy Los Alamos National Laboratory to increase the...

  6. Changes in measured lightning return stroke peak current after the 1994 National Lightning Detection Network upgrade 

    E-Print Network [OSTI]

    Wacker, Robert Scott

    1997-01-01

    Since a comprehensive upgrade of the US National Lightning Detection Network (NLDN) in 1994, the mean peak current of detected cloud-to-ground (CG) lightning flashes has decreased, the number of detected flashes has ...

  7. Rigorous Simulation Model of Kerogen Pyrolysis for the In-situ Upgrading of Oil Shales 

    E-Print Network [OSTI]

    Lee, Kyung Jae

    2014-10-09

    Oil shale is a vast, yet untapped energy source, and the pyrolysis of kerogen in the oil shales releases recoverable hydrocarbons. In this dissertation, we investigate how to increase process efficiency and decrease the costs of in-situ upgrading...

  8. Energy Efficiency Upgrades Make a Big Difference to a Small Organizati...

    Broader source: Energy.gov (indexed) [DOE]

    the Perni Youth Center. For many small businesses with already tight budgets, energy efficiency upgrades aren't always a top priority. This was the case for the Pemi Youth Center...

  9. Transcript of April 11, 2013, TAP webinar titled Financing Energy Upgrades for K-12 School Districts

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

  10. Technical Barriers, Gaps,and Opportunities Related to Home Energy Upgrade Market Delivery

    SciTech Connect (OSTI)

    Bianchi, Marcus V.A.

    2011-11-01

    This report outlines the technical barriers, gaps, and opportunities that arise in executing home energy upgrade market delivery approaches, as identified through research conducted by the U.S. Department of Energy's Building America program.

  11. Participation as an end versus a means : understanding a recurring dilemma in urban upgrading

    E-Print Network [OSTI]

    Fallavier, Pierre

    2007-01-01

    Since the 1920s, participatory approaches to urban upgrading in developing nations have demonstrated that involving the urban poor in the physical, social, and economic development of their settlements could improve their ...

  12. All that glitters is not gold : unexpected lessons from a slum upgrading program in Brazil

    E-Print Network [OSTI]

    Zuin, Valentina

    2005-01-01

    This paper looks at the Ribeira Azul Slum Upgrading Program in Salvador de Bahia Brazil, implemented by the development agency of the state of Bahia, CONDER, and the Italian NGO Associazione Volontari per il Servizio ...

  13. U.S. Department of Energy Project Review Guide for Capital Asset Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-23

    This Guide addresses the various project reviews conducted during the life-cycle of a project based on the stage, complexity and duration of a project. This Guide describes typical reviews, the purpose of each, the timing during the project life-cycle, lines of inquiry, and required documentation. No cancellations.

  14. Summary of Initial Examination of Lighting-Only Utility Projects in the Federal Sector

    SciTech Connect (OSTI)

    Solana, Amy E.; Sandusky, William F.; Mcmordie, Katherine

    2007-07-26

    This work complements earlier work on an analysis of Federal utility energy projects that implemented excusively lighting upgrades. The objective of this analysis is to better understand the lighting-only projects through determination of the relationship of capital invested and the resulting energy and cost savings, in terms of geographic locale, project size, and potential according to specific lighting technologies and/or control technology implemented.

  15. Application of power-factor correction in the Tandem Mirror Experiment Upgrade magnet power supply

    SciTech Connect (OSTI)

    Corvin, W.C.

    1981-08-14

    The magnet power supply for the Tandem Mirror Experiment Upgrade (TMX Upgrade) contains 24 groups of dc rectifiers that feed the water-cooled magnets. Each group consists of five or less rectifiers, connected in series. All 24 are current-regulating, using phase-controlled bilateral thyristors in the rectifier transformer primaries. The electric utility system must furnish reactive power to these phase-controlled thyristors as well as to the cmmutating diodes in the rectifier bridges.

  16. CEBAF energy upgrade program including re-work of CEBAF cavities

    SciTech Connect (OSTI)

    Joseph Preble

    2008-02-12

    The Thomas Jefferson National Accelerator Facility, Jefferson Lab, is planning an upgrade of the CEBAF accelerator from a maximum energy of 6 GeV to 12 GeV and from 3 to 4 experimental halls. This paper will discuss the plans for upgrading the energy of the machine which requires improvements of the existing Super Conducting Radio Frequency (SRF) cryomodules and the additions of ten newly designed high performance SRF cryomodules.

  17. DRIVER ACCELERATOR DESIGN FOR THE 10 KW UPGRADE OF THE JEFFERSON LAB IR FEL

    E-Print Network [OSTI]

    DRIVER ACCELERATOR DESIGN FOR THE 10 KW UPGRADE OF THE JEFFERSON LAB IR FEL D. Douglas, S. V, Newport News, VA23606, USA Abstract An upgrade of the Jefferson Lab IR FEL [1] is now un- der construction. It will provide 10 kW output light power in a wavelength range of 2­10 µm. The FEL will be driven by a modest

  18. Performance of the upgraded NSLS beam position monitors

    SciTech Connect (OSTI)

    Nawrocky, R.J.; Keane, J.

    1997-07-01

    The design and initial performance of the original NSLS beam position monitor were described by J. Bittner and R. Biscardi in 1989. The receiver, which processes signals from four button type pick-up electrodes by time-division multiplexing, operates at the third harmonic of the ring rf frequency (158.66 MHz). It has an output bandwidth of about 2 kHz and a dynamic signal range of approximately 36 dB. A total of 92 receivers have been installed in the NSLS X-ray and VUV storage rings for orbit monitoring and for real time feedback. As part of a continuous effort to improve the NSLS storage ring performance, the BPMs as well as other instrumentation systems have also been undergoing upgrades over the past two years to improve their performance. In the BPM, the front end has been modified to prevent saturation of the rf multiplexing switch, the detector operating point was changed to improve output signal linearity, the dynamic range was increased to over 60 dB, and the gain calibration was standardized to 0.5 volts/mm (i.e. 2 {micro}m/mV). This paper describes the BPM modifications and presents some performance data and measurements on stored beam.

  19. Detector development for Jefferson Lab's 12GeV Upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Qiang, Yi

    2015-05-01

    Jefferson Lab will soon finish its highly anticipated 12 GeV Upgrade. With doubled maximum energy, Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) will enable a new experimental program with substantial discovery potential, addressing important topics in nuclear, hadronic and electroweak physics. In order to take full advantage of the high energy, high luminosity beam, new detectors are being developed, designed and constructed to fit the needs of different physics topics. The paper will give an overview of various new detector technologies to be used for 12 GeV experiments. It will then focus on the development of two solenoid-based spectrometers,more »the GlueX and SoLID spectrometers. The GlueX experiment in Hall D will study the complex properties of gluons through exotic hybrid meson spectroscopy. The GlueX spectrometer, a hermetic detector package designed for spectroscopy and the associated partial wave analysis, is currently in the final stage of construction. Hall A, on the other hand, is developing the SoLID spectrometer to capture the 3D image of the nucleon from semi-inclusive processes and to study the intrinsic properties of quarks through mirror symmetry breaking. Such a spectrometer will have the capability to handle very high event rates while still maintaining a large acceptance in the forward region.« less

  20. Upgrading the performance of groudwater VOC air strippers

    SciTech Connect (OSTI)

    Nelson, A.D. [Rockwell International Corp., Canoga Park, CA (United States); Schmitt, R.J. [EnviroSolve Corp., Agoura Hills, CA (United States); Dickeson, D. [Lantec Products, Inc., Agoura Hills, CA (United States)

    1997-12-31

    Rocketdynes Santa Susana Field Laboratory has been treating groundwater to remove chlorinated solvents since 1987. Six air stripping treatment installations, using vapor-phase carbon to control air emissions, have consistently met effluent quality standards over nine years of operation. In 1995, Rocketdyne embarked on an inspection and maintenance program to thoroughly check tower equipment and packing condition and to improve treatment efficiency using new packing technology now available. Baseline removal efficiency measurements were made on one large-capacity air stripper, which was then shut down for inspection. The original random packing was found to be fouled, and had settled too far below the level of the spray nozzle. The packing was removed, and replaced with a newer, high-efficiency packing. As a result, single-stage removal efficiency for trichloroethylene increased from 98.5% to > 99.60%. Aside from demonstrating the improvement attainable by upgrading the packing media, Rocketdyne`s maintenance program also highlighted the critical importance of proper liquid distribution. At one point, the refurbished air stripper was overpacked, resulting in concentration of the water spray near the center of the packed section. The liquid distribution was found to remain grossly nonuniform even after the water had trickled down over 8.2 meters of packing in a 91-cm diameter column. 4 refs., 1 fig., 5 tabs.

  1. Heavy oil upgrading via fluidized bed processing and hydrogenation processing

    SciTech Connect (OSTI)

    Dawson, F.N. Jr. [California Synfuels Research Corp., Palos Verdes, CA (United States)

    1995-09-01

    California is the second largest crude oil producer in the lower 48 states. Nearly half of its production is heavy oil, difficult to transport and costly to refine. Given better methods of processing, production could be expanded. Likewise, huge worldwide reserves of heavy oils could be better exploited if more attractive processing methods were available. Midway Sunset crude at 11.8 API gravity, is a fairly difficult crude to process. It has about 1.5 percent sulfur, a very high nitrogen content, in the range of 0.7--0.8%, and metals of approximately 120--170 ppm, vanadium plus nickel. The authors will be reporting here results of the pilot plant testing to see whether non-catalytic fluid bed cracking technology, operated at low conversion, followed by hydrogenation would be economically attractive. Results suggest that this approach is competitive with delayed coking and with atmospheric resid desulfurization. This approach successfully combines carbon removal and hydrogen addition techniques for heavy oil upgrading. Comparative yields, product quality and economic considerations are reviewed in this study.

  2. Booster Synchrotron RF System Upgrade for SPEAR3

    SciTech Connect (OSTI)

    Park, Sanghyun; Corbett, Jeff; /SLAC

    2012-07-06

    Recent progress at the SPEAR3 includes the increase in stored current from 100 mA to 200 mA and top-off injection to allow beamlines to stay open during injection. Presently the booster injects 3.0 GeV beam to SPEAR3 three times a day. The stored beam decays to about 150 mA between the injections. The growing user demands are to increase the stored current to the design value of 500 mA, and to maintain it at a constant value within a percent or so. To achieve this goal the booster must inject once every few minutes. For improved injection efficiency, all RF systems at the linac, booster and SPEAR3 need to be phase-locked. The present booster RF system is basically a copy of the SPEAR2 RF system with 358.5 MHz and 40 kW peak RF power driving a 5-cell RF cavity for 1.0 MV gap voltage. These requirements entail a booster RF system upgrade to a scaled down version of the SPEAR3 RF system of 476.3 MHz with 1.2 MW cw klystron output power capabilities. We will analyze each subsystem option for their merits within budgetary and geometric space constraints. A substantial portion of the system will come from the decommissioned PEP-II RF stations.

  3. Detector development for Jefferson Lab's 12GeV Upgrade

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Qiang, Yi [JLAB] (ORCID:0000000170267841)

    2015-05-01

    Jefferson Lab will soon finish its highly anticipated 12 GeV Upgrade. With doubled maximum energy, Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) will enable a new experimental program with substantial discovery potential, addressing important topics in nuclear, hadronic and electroweak physics. In order to take full advantage of the high energy, high luminosity beam, new detectors are being developed, designed and constructed to fit the needs of different physics topics. The paper will give an overview of various new detector technologies to be used for 12 GeV experiments. It will then focus on the development of two solenoid-based spectrometers, the GlueX and SoLID spectrometers. The GlueX experiment in Hall D will study the complex properties of gluons through exotic hybrid meson spectroscopy. The GlueX spectrometer, a hermetic detector package designed for spectroscopy and the associated partial wave analysis, is currently in the final stage of construction. Hall A, on the other hand, is developing the SoLID spectrometer to capture the 3D image of the nucleon from semi-inclusive processes and to study the intrinsic properties of quarks through mirror symmetry breaking. Such a spectrometer will have the capability to handle very high event rates while still maintaining a large acceptance in the forward region.

  4. Screening of processing and upgrading schemes. Task 3

    SciTech Connect (OSTI)

    Not Available

    1991-10-01

    The RFP was predicated on DOE`s desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily ``skimmed`` from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

  5. Process for upgrading wax from Fischer-Tropsch synthesis

    SciTech Connect (OSTI)

    Derr, W.R. Jr.; Garwood, W.E.; Kuo, J.C.; Leib, T.M.; Nace, D.M.; Tabak, S.A.

    1987-08-04

    A processor is described for converting synthesis gas to liquid hydrocarbons comprising the steps of: (a) charging the synthesis gas to a Fischer-Tropsch synthesis conversion zone containing a catalyst providing CO reducing characteristics to produce a waxy hydrocarbon liquid; (b) separating hydrocarbon wax from the waxy liquid; (c) catalytically cracking the wax in a fluidized bed of acid crystalline zeolite at cracking temperature under process conditions requiring a supply of heat to effect cracking, producing olefinic liquid hydrocarbon crackate in the gasoline and distillate boiling range along with olefinic light gas; (d) recovering distillate range hydrocarbons from the liquid crackate; (e) further converting the olefinic gasoline range hydrocarbon crackate and olefinic light gas under oligomerization conditions in contact with a shape selective medium pore acid oligomerization catalyst to upgrade at least a portion of the olefinic crackate and olefinic light gas to distillate range hydrocarbon product and producing by-product light fuel gas; (f) separating the light fuel gas from step (e) and passing the light fuel gas to cracking step (c) to supply heat.

  6. RF System Modeling for the CEBAF Energy Upgrade

    SciTech Connect (OSTI)

    Tomasz Plawski, J. Hovater

    2009-05-01

    An RF system model, based on MATLAB/SIMULINK, has been developed for analyzing the basic characteristics of the low level RF (LLRF) control system being designed for the CEBAF 12 GeV Energy Upgrade. In our model, a typical passband cavity representation is simplified to in-phase and quadrature (I&Q) components. Lorentz Force and microphonic detuning are incorporated as a new quadrature carrier frequency (frequency modulation). Beam is also represented as in-phase and quadrature components and superpositioned with the cavity field vector. Signals pass through two low pass filters, where the cutoff frequency is equal to half of the cavity bandwidth, then they are demodulated using the same detuning frequency. Because only baseband I&Q signals are calculated, the simulation process is very fast when compared to other controller-cavity models. During the design process we successfully analyzed gain requirements vs. field stability for different superconducting cavity microphonic backgrounds and Lorentz Force coefficients. Moreover, we were able to evaluate different types of a LLRF system’s control algorithm: GDR (Generator Driven Resonator) and SEL (Self Excited Loop) [1] as well as klystron power requirements for different cavities and beam loads.

  7. Boron-10 Lined Proportional Counter Model Validation

    SciTech Connect (OSTI)

    Lintereur, Azaree T.; Siciliano, Edward R.; Kouzes, Richard T.

    2012-06-30

    The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project “Coincidence Counting With Boron-Based Alternative Neutron Detection Technology” at Pacific Northwest National Laboratory (PNNL) for the development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube-based alternative system in the configuration of a coincidence counter. This report discusses the validation studies performed to establish the degree of accuracy of the computer modeling methods current used to simulate the response of boron-lined tubes. This is the precursor to developing models for the uranium neutron coincidence collar under Task 2 of this project.

  8. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  9. Pulsed power supply for Nova Upgrade. Final report, August 1, 1991 to March 31, 1992

    SciTech Connect (OSTI)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-12-31

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 {mu}m light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps.

  10. MPC and A upgrades at the Institute of Theoretical and Experimental Physics (ITEP)

    SciTech Connect (OSTI)

    Haase, M.; Smarto, C. [Dept. of Energy, Washington, DC (United States); Baumann, M. [Sandia National Labs., Albuquerque, NM (United States)] [and others

    1998-07-01

    Materials Protection, Control and Accounting (MPC and A) equipment upgrades are complete at the Institute of Theoretical and Experimental Physics (ITEP), a site that has significant quantities of weapons-potential nuclear materials. Cooperative work was initiated at this Moscow facility as a part of the US-Russian program to upgrade MPC and A systems. An initial site visit and assessment were conducted in September 1996 to establish communication between ITEP, the US Department of Energy (DOE), and participating US National Laboratories. Subsequently, an agreement was reached to develop two master plans for MPC and A upgrades. Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) assisted in developing a plan for Material Control and Accounting (MC and A) upgrades, and Sandia National Laboratories (SNL) assisted in developing a plan for Physical Protection System (PPS) upgrades. The MC and A plan included MC and A training, a mass measurement program, nondestructive assay instrumentation, item identification (bar coding), physical inventory taking, portal and hand-held nuclear material monitors, and a nuclear materials accounting system. The PPS plan included basic PPS design training, Central Alarm Station (CAS) relocation and equipment upgrades, a site and critical-building access control system, intrusion detection, alarm assessment, and guard force communications.

  11. Project Year Project Team

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    & Sciences Project Title Visualize Physical Principles with Virtual Lab Modules Audience Undergraduate provide easy access to digital information, but don't provide experience with right- hand screws, electric of the last generation of physics students. The result is that today's students don't have an intuitive

  12. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    . Pedagogical Issue One of the challenges in teaching the Introduction to Computer Music course is the lack flow and practices. These resources will provide an online space through which students will be able piece of this project will be an animated studio walkthrough requiring user interaction and providing

  13. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  14. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  15. SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet. SunLine Test Drives Hydrogen Bus: Hydrogen Fuel...

  16. SunLine Expands Horizons with Fuel Cell Bus Demo. Hydrogen, Fuel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expands Horizons with Fuel Cell Bus Demo. Hydrogen, Fuel Cells & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects (Fact Sheet). SunLine Expands Horizons...

  17. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  18. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    SciTech Connect (OSTI)

    Garrison, R.C.

    1995-02-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of the Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.

  19. Upgrade of the LHC magnet interconnections thermal shielding

    SciTech Connect (OSTI)

    Musso, Andrea; Barlow, Graeme; Bastard, Alain; Charrondiere, Maryline; Deferne, Guy; Dib, Gaëlle; Duret, Max; Guinchard, Michael; Prin, Hervé; Craen, Arnaud Vande; Villiger, Gilles [CERN European Organization for Nuclear Research, Meyrin 1211, Geneva 23, CH (Switzerland); Chrul, Anna [The Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences, ul.Radzikowskiego 152, 31-324 Krakow (Poland); Damianoglou, Dimitrios [NTUA National Technical University of Athens, Heeron Polytechniou 9, 15780 Zografou (Greece); Strychalski, Micha? [Wroclaw University of Technology, Faculty of Mechanical and Power Engineering, Wyb. Wyspianskiego 27, Wroclaw, 50-370 (Poland); Wright, Loren [Lancaster University, Bailrigg, Lancaster, LA1 4YW (United Kingdom)

    2014-01-29

    The about 1700 interconnections (ICs) between the Large Hadron Collider (LHC) superconducting magnets include thermal shielding at 50-75 K, providing continuity to the thermal shielding of the magnet cryostats to reduce the overall radiation heat loads to the 1.9 K helium bath of the magnets. The IC shield, made of aluminum, is conduction-cooled via a welded bridge to the thermal shield of the adjacent magnets which is actively cooled. TIG welding of these bridges made in the LHC tunnel at installation of the magnets induced a considerable risk of fire hazard due to the proximity of the multi-layer insulation of the magnet shields. A fire incident occurred in one of the machine sectors during machine installation, but fortunately with limited consequences thanks to prompt intervention of the operators. LHC is now undergoing a 2 years technical stop during which all magnet's ICs will have to be opened to consolidate the magnet electrical connections. The IC thermal shields will therefore have to be removed and re-installed after the work is completed. In order to eliminate the risk of fire hazard when re-welding, it has been decided to review the design of the IC shields, by replacing the welded bridges with a mechanical clamping which also preserves its thermal function. An additional advantage of this new solution is the ease in dismantling for maintenance, and eliminating weld-grinding operations at removal needing radioprotection measures because of material activation after long-term operation of the LHC. This paper describes the new design of the IC shields and in particular the theoretical and experimental validation of its thermal performance. Furthermore a status report of the on-going upgrade work in the LHC is given.

  20. Planning and processing of new or upgraded electric transmission systems in New Mexico

    SciTech Connect (OSTI)

    Toole, Gasper Loren [Los Alamos National Laboratory

    2009-01-01

    RETA has been requested to identify and prioritize renewable energy resource zones in New Mexico that have a potential to support industry development among renewable energy developers for renewable resource generation projects. Moreover, Senate Memorial 44 requests that RETA identify and prioritize the best viable options for potential transmission corridors to accommodate renewable energy export from New Mexico in accordance with a defined time-line and to convene a working group to submit recommendations to the legislature for establishing a process to streamline procedures for establishing renewable energy transmission projects in New Mexico. RETA's July 9, 2009 request for comments outlined seven topical areas of specific value to Senate Memorial 44. This document addresses Topics 1, 3 and 4.