1

EIS-0447: Champlain Hudson Power Express Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the...

2

EA-1880: Big Bend to Witten Transmission Line Project, South...  

Office of Environmental Management (EM)

880: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with...

3

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

4

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

5

EIS-0317: Kangley-Echo Lake Transmission Line Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

6

EIS-0101: Thermopolis, Alcova, Casper Transmission Line Project  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this statement to evaluate the environmental impacts of constructing, operating and maintaining a 230-kilovolt transmission line between Thermopolis, Wyoming, and Alcova, Wyoming, and a 230/345-kilovolt transmission line between Alcova, Wyoming, and Casper, Wyoming.

7

EIS-0106: Great Falls-Conrad Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

8

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

9

EIS-0124: Conrad-Shelby Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

10

EIS-0499: Great Northern Transmission Line Project, Minnesota  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 750-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.

11

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin)  

Broader source: Energy.gov [DOE]

This page describes application requirements for all projects that involve the installation of an electricity transmission line or substation that also require either a Certificate of Public...

12

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

13

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

14

EIS-0090: Fort Peck-Havre Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

15

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

16

EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

17

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

18

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register  

Broader source: Energy.gov [DOE]

The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

19

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

20

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

22

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

23

EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western’s transmission system.

24

Design and Manufacture of the RF Power Supply and RF Transmission Line for SANAEM Project Prometheus  

E-Print Network [OSTI]

A 1-5 MeV proton beamline is being built by the Turkish Atomic Energy Authority in collaboration with a number of graduate students from different universities. The most important aspect of the project, is to acquire the design ability and manufacturing capability of all the components locally. SPP will be an accelerator and beam diagnostics test facility and it will also serve the detector development community with its low beam current. This paper discusses the design and construction of the RF power supply and the RF transmission line components such as its waveguide converters and its circulator.

Turemen, G; Unel, G; Alacakir, A

2015-01-01T23:59:59.000Z

25

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

26

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO  

Broader source: Energy.gov [DOE]

Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

27

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

28

EIS-0332: McNary-John Day Transmission Line Project, OR  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

29

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

30

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York  

Broader source: Energy.gov [DOE]

This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

31

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona  

Broader source: Energy.gov [DOE]

Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

32

EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

33

Electric Transmission Lines (Nebraska)  

Broader source: Energy.gov [DOE]

The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

34

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

35

The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

36

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

Not Available

1994-02-01T23:59:59.000Z

37

Announcement of Change in Public Meeting Location for the Northern Pass Transmission Line Project Published in the Federal Register  

Broader source: Energy.gov [DOE]

The Department announces a change of location for the September 26, 2013 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. The meeting will be from 5 to 8 p.m.

38

OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

39

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

40

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana  

Broader source: Energy.gov [DOE]

DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/HotSpringsAna....

42

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

43

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect (OSTI)

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

Not Available

1991-06-01T23:59:59.000Z

44

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

45

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

46

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

47

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

48

Omega Transmission Lines  

E-Print Network [OSTI]

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

49

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

Not Available

1993-12-01T23:59:59.000Z

50

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

51

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing Colorado and...

52

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

53

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington  

Broader source: Energy.gov [DOE]

This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

54

EIS-0011: New Melones 230-kV Electrical Transmission Line, Central Valley Project, California  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration prepared this statement to evaluate the environmental impacts of proposed development of an electrical transmission system for the New Melones Power Plant.

55

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Broader source: Energy.gov (indexed) [DOE]

Florence, Oregon. Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryLane-Wendson. PUBLIC COMMENT OPPORTUNITIES...

56

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington  

Broader source: Energy.gov [DOE]

The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

57

EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California  

Broader source: Energy.gov [DOE]

The Department of the Interior’s Bureau of Indian Affairs considered preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency. This project has been canceled.

58

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect (OSTI)

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

59

Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming  

SciTech Connect (OSTI)

The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

Not Available

1990-07-01T23:59:59.000Z

60

Regional Transmission Projects: Finding Solutions  

SciTech Connect (OSTI)

The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association of State Utility Consumer Advocates National Grid Northeast Utilities PA Office of Consumer Advocates Pacific Gas & Electric Corporation Pennsylvania Public Utility Commission PJM Interconnection The Electricity Consumers Resource Council U.S. Department of Energy US Department of the Interior Van Ness Feldman Western Interstate Energy Board Wind on the Wires Wisconsin Public Service Commission Xcel Energy

The Keystone Center

2005-06-15T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

62

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect (OSTI)

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

63

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

64

High voltage overhead long transmission line design and fault analysis.  

E-Print Network [OSTI]

??The goal of this project is to design a reliable high voltage overhead long transmission line that satisfies specific design criteria including voltage regulation, efficiency,… (more)

Elzain, Mohamed Ali

2011-01-01T23:59:59.000Z

65

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

66

Florida Electric Transmission Line Siting Act (Florida)  

Broader source: Energy.gov [DOE]

The Transmission Line Siting Act (TLSA) is the state’s centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15...

67

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

68

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

69

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

70

Transmission line environmental assessment guidance document  

SciTech Connect (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

71

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

72

EIS-0231: Navajo Transmission Project  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned...

73

EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.  

Broader source: Energy.gov [DOE]

This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Western’s participation with Tri-State would be in exchange for capacity rights on the transmission lines.

74

EIS-0411: Transmission Agency of Northern California Transmission Project  

Broader source: Energy.gov [DOE]

This EIS is for the Western Area Power Administration construction, operation, and maintenance of the proposed transmission agency of Northern California Transmission Project, California.

75

Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

N /A

2000-03-20T23:59:59.000Z

76

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

77

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

78

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

79

EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming.

80

EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration so that WAPA could supplement it in support of WAPA’s National Environmental Policy Act requirements for a related project.

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Proposed Project: Plains & Eastern Clean Line | Department of...  

Broader source: Energy.gov (indexed) [DOE]

the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy...

82

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

83

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

84

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network [OSTI]

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

85

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

86

EIS-0344: Grand Coulee-Bell 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

87

Load-resistant coaxial transmission line  

DOE Patents [OSTI]

A transmission line for downhole tools that make up all or part of a tool string for drilling and production of oil, gas, and geothermal wells that can withstand the dynamic gravitational forces and other accelerations associated with downhole excavations. The transmission line has a metal tube, or outer conductor, that houses a coaxial wire inner conductor. A non-metallic dielectric material is interposed between the inner and outer conductors. The outer and inner conductors and the dielectric are sufficiently compressed together so that independent motion between them is abated. Compression of the components of the transmission line may be achieved by drawing the transmission through one or more dies in order to draw down the outer conductor onto the dielectric, or by expanding the inner conductor against the dielectric using a mandrel or hydraulic pressure. Non-metallic bead segments may be used in aid of the compression necessary to resist the dynamic forces and accelerations of drilling.

Hall, David R.; Fox, Joe

2006-01-03T23:59:59.000Z

88

Request for Information on Permitting of Transmission Lines:...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

89

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday,DepartmentTheandElectric Transmission

90

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting...

91

CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES Rashmi Pathak  

E-Print Network [OSTI]

CHARACTERIZING LOSSES IN MICROSTRIP TRANSMISSION LINES by Rashmi Pathak A dissertation submitted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2.1 Transmission Lines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 2 Engineering) at the UNIVERSITY OF WISCONSIN­MADISON Summer 2005 #12;i Characterizing Losses in Transmission

Timbie, Peter

92

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Improvement (CBPI) Customer Forum Energy Imbalance Market Generator Interconnection Reform Implementation Network Integration Transmission Service (NT Service) Network Open...

93

Radio-Frequency Interference (RFI) From Extra-High-Voltage (EHV) Transmission Lines  

E-Print Network [OSTI]

-current (HVAC) transmission lines; high-voltage direct-current (HVDC) transmission lines will be addressed

Ellingson, Steven W.

94

Wireless Sensor Network for Electric Transmission Line Monitoring  

SciTech Connect (OSTI)

Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization applications to deliver real-time information to federal agencies and others tasked with grid reliability (Tasks 6,8)

Alphenaar, Bruce

2009-06-30T23:59:59.000Z

95

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network [OSTI]

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

96

EIS-0421: Big Eddy-Knight Transmission Line  

Broader source: Energy.gov [DOE]

BPA is proposing to build a new 500 kilovolt (kV) transmission line in Wasco County, Oregon and Klickitat County, Washington and a new substation in Klickitat County. The new BPA transmission line...

97

BPA Transmission Commercial Project Roadmap  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commercial Project Roadmap 15-Minute Scheduling Dynamic Transfer Program NT Redispatch WECC-Bal- 002 ST Comp & Preemption ST ATC Method. PCM Monthlyweekly Implementation PCM...

98

Final Report Navajo Transmission Project (NTP)  

SciTech Connect (OSTI)

The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

Bennie Hoisington; Steven Begay

2006-09-14T23:59:59.000Z

99

Free Vibrations of Coupled Spans of Overhead Transmission Lines  

E-Print Network [OSTI]

damage to the cables. Figure 1: Overhead transmission lines. Spans are suspended between towers fromFree Vibrations of Coupled Spans of Overhead Transmission Lines Sjoerd W. Rienstra Department transmission lines is studied. It is shown that the natural vibration is the gravity mode, which is free from

Eindhoven, Technische Universiteit

100

Reference: RGL 83-09 Subject: POWER TRANSMISSION LINES  

E-Print Network [OSTI]

Reference: RGL 83-09 Subject: POWER TRANSMISSION LINES Title: MARKING OF AERIAL POWER TRANSMISSION. 1. The marking of aerial power transmission lines, cables, and structures over the navigable waters LINES, CABLES, & STRUCTURES Issued: 07/13/83 Expires: 12/31/85 Originator: DAEN-CWO-N Description: ARMY

US Army Corps of Engineers

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Using Transmission Lines for Global On-Chip Communication  

E-Print Network [OSTI]

1 Using Transmission Lines for Global On-Chip Communication Aaron Carpenter, Jianyun Hu, Jie Xu-switched network-on-chip a less attractive option. An alternative solution uses well-engineered transmission lines as communication links. These transmission lines, along with simple, practical circuits using modern CMOS technol

Huang, Michael C.

102

Asymmetric parametric amplification in nonlinear left-handed transmission lines  

E-Print Network [OSTI]

Asymmetric parametric amplification in nonlinear left-handed transmission lines David A. Powell amplification in nonlinear left-handed transmission lines, which serve as model systems for nonlinear negative-handed regime. © 2009 American Institute of Physics. DOI: 10.1063/1.3089842 Left-handed transmission lines

103

Nonlinear Free Vibrations of Coupled Spans of Overhead Transmission Lines  

E-Print Network [OSTI]

Nonlinear Free Vibrations of Coupled Spans of Overhead Transmission Lines Sjoerd W. Rienstra transmission lines is studied. It is shown that the natural vibration is the gravity mode, of which of the phenomenon of galloping, which is a high amplitude periodic oscillation of overhead transmission lines due

Rienstra, Sjoerd W.

104

Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines  

E-Print Network [OSTI]

Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines Mohammad desired frequencies. The proposed structure contains two Microstrip Nonuniform Transmission Lines (MNTLs­6] and using composite right/left-handed transmission line (CRLH) [7]. The main disadvantage of multistage

Paris-Sud XI, Université de

105

New approach for modelling distributed MEMS transmission lines  

E-Print Network [OSTI]

New approach for modelling distributed MEMS transmission lines K. Topalli, M. Unlu, S. Demir, O for the distributed MEMS transmission line (DMTL) structures. In this new model, the MEMS bridges that are used as the loading elements of the DMTL structures are represented as low-impedance transmission lines, rather than

Akin, Tayfun

106

Dispersion-free radial transmission lines  

DOE Patents [OSTI]

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

107

Giant vacuum forces via transmission lines  

E-Print Network [OSTI]

Quantum electromagnetic fluctuations induce forces between neutral particles, known as the van der Waals (vdW) and Casimir interactions. These fundamental forces, mediated by virtual photons from the vacuum, play an important role in basic physics and chemistry, and in emerging technologies involving, e.g. micro-electromechanical systems or quantum information processing. Here we show that these interactions can be enhanced by many orders of magnitude upon changing the character of the mediating vacuum-modes. By considering two polarizable particles in the vicinity of any standard electric transmission line, along which photons can propagate in one dimension (1d), we find a much stronger and longer-range interaction than in free-space. This enhancement may have profound implications on many-particle and bulk systems, and impact the quantum technologies mentioned above. The predicted giant vacuum force is estimated to be measurable in a coplanar waveguide line.

Ephraim Shahmoon; Igor Mazets; Gershon Kurizki

2014-07-23T23:59:59.000Z

108

NREL: Transmission Grid Integration - Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions andData and ResourcesOtherForecasting NREL researchersPotentialProjects

109

Structural Optimization of High Voltage Transmission Line Towers considering  

E-Print Network [OSTI]

Structural Optimization of High Voltage Transmission Line Towers considering Continuum and Discrete/or to common designs largely repeated (e.g. automotive compo- nents), and high voltage transmission towers can than conventional designs of high voltage transmission line towers. The optimization model proposed

Colominas, Ignasi

110

Radio frequency communication system utilizing radiating transmission lines  

DOE Patents [OSTI]

A radio communication system for use in tunnels, mines, buildings or other shielded locations in which a pair of radiating transmission lines (30), (31) extend through such location in spaced coextensive relation to each other. Each transmission line (30), (31) has at least one unidirectional amplifier (32), (33) interposed therein with the sense of the unidirectional amplifier (32) of one transmission line (30) being opposite to the sense of the unidirectional amplifier (33) of the other transmission line (31). Each of the amplifiers (32), (33) has a gain which is less than the coupling loss between the transmission lines (30), (31). Two or more mobile transceivers (35) in the location served by the system are coupled to the transmission lines (30), (31) by electromagnetic wave propagation in space in order to communicate directly with each other at a given radio frequency within the frequency range of the system.

Struven, Warren C. (San Carlos, CA)

1984-01-01T23:59:59.000Z

111

EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho...  

Office of Environmental Management (EM)

Transmission Line, Oregon and Idaho SUMMARY The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE's Bonneville Power Administration (BPA) as a...

112

Notice of Availability of Plains & Eastern Clean Line Transmission...  

Energy Savers [EERE]

in Oklahoma and Tennessee; an approximately 720-mile high voltage direct current (HVDC) transmission line; an alternating current (AC) collection system; and access roads....

113

Nondestructive Testing of Overhead Transmission Lines: Numerical and Experimental Investigation  

E-Print Network [OSTI]

Overhead transmission lines are periodically inspected using both on-ground and helicopter-aided visual inspection. Factors including sun glare, cloud cover, close proximity to power lines and the rapidly changing visual circumstances make airborne...

Kulkarni, Salil Subhash

2011-02-22T23:59:59.000Z

114

Lumped Model of Transmission Line In the Instrumentation Studio, we use both a coil of coax (around 80-100 meters long)  

E-Print Network [OSTI]

Lumped Model of Transmission Line In the Instrumentation Studio, we use both a coil of coax (around 80-100 meters long) and an equivalent lumped model of the coil of coax to study transmission lines.7 Ideal Transmission Line Frequency Volts respectively. In Project 2 (Spring 2000) we use the lumped line

Lü, James Jian-Qiang

115

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements  

E-Print Network [OSTI]

a stable operation. Transmission line loading limits are also essential to deter- mine locational marginal loading margins provide a useful metric to operate the power sys- tem to satisfy demands while ensuring prices in power markets. Therefore, the assessment of transmission line loadability under various

Liberzon, Daniel

116

Low Frequency Transmission Final Project Report  

E-Print Network [OSTI]

to HVDC transmission and conventional AC transmission in different configurations. The issue is quite

117

Transmission Project Reporting FPA 216h | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Disturbance Events Incident Reporting Emergency Situation Reports Energy Assurance Daily Transmission Project Reporting Library New Reports & Other Materials Meetings & Events...

118

Hyperreal Waves on Transfinte, Terminated, Distortionless and Lossless, Transmission Lines  

E-Print Network [OSTI]

A prior work (see Chapter 8 of the book, ``Graphs and Networks: Transfinite and Nonstandard,'' Birkhauser-Boston, Cambridge, Mass., USA, 2004) examined the propagation of an electromagnetic wave on a transfinite transmission line, transfinite in the sense that infinitely many one-way infinite transmission lines are connected in cascade. That there are infinitely many such one-way infinite lines results in the wave propagating without ever reflecting at some discontinuity. The present work examines the cascade where the cascade terminates after only finitely many one-way infinite transmission lines, with the result that reflected waves are now produced at both the far end as well as at the initial end of the transfinite transmission line. The question of whether the reflected waves are infini tesimal or appreciable and whether they sum to an infinitesimal or appreciable amount are resolved for both distortionless and lossless lines. Finally, the generalizations to higher ranks of transfiniteness is briefly summarized.

A. H. Zemanian

2004-06-10T23:59:59.000Z

119

EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona  

Broader source: Energy.gov [DOE]

Western Area Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of a 35.6-mile transmission line that Western operates and maintains under an agreement with the Central Arizona Project. Additional information is available on the project website, http://www.wapa.gov/dsw/environment/ED2DOEEA1972.htm.

120

Great Plains Wind Energy Transmission Development Project  

SciTech Connect (OSTI)

In fiscal year 2005, the Energy & Environmental Research Center (EERC) received funding from the U.S. Department of Energy (DOE) to undertake a broad array of tasks to either directly or indirectly address the barriers that faced much of the Great Plains states and their efforts to produce and transmit wind energy at the time. This program, entitled Great Plains Wind Energy Transmission Development Project, was focused on the central goal of stimulating wind energy development through expansion of new transmission capacity or development of new wind energy capacity through alternative market development. The original task structure was as follows: Task 1 - Regional Renewable Credit Tracking System (later rescoped to Small Wind Turbine Training Center); Task 2 - Multistate Transmission Collaborative; Task 3 - Wind Energy Forecasting System; and Task 4 - Analysis of the Long-Term Role of Hydrogen in the Region. As carried out, Task 1 involved the creation of the Small Wind Turbine Training Center (SWTTC). The SWTTC, located Grand Forks, North Dakota, consists of a single wind turbine, the Endurance S-250, on a 105-foot tilt-up guyed tower. The S-250 is connected to the electrical grid on the 'load side' of the electric meter, and the power produced by the wind turbine is consumed locally on the property. Establishment of the SWTTC will allow EERC personnel to provide educational opportunities to a wide range of participants, including grade school through college-level students and the general public. In addition, the facility will allow the EERC to provide technical training workshops related to the installation, operation, and maintenance of small wind turbines. In addition, under Task 1, the EERC hosted two small wind turbine workshops on May 18, 2010, and March 8, 2011, at the EERC in Grand Forks, North Dakota. Task 2 involved the EERC cosponsoring and aiding in the planning of three transmission workshops in the midwest and western regions. Under Task 3, the EERC, in collaboration with Meridian Environmental Services, developed and demonstrated the efficacy of a wind energy forecasting system for use in scheduling energy output from wind farms for a regional electrical generation and transmission utility. With the increased interest at the time of project award in the production of hydrogen as a critical future energy source, many viewed hydrogen produced from wind-generated electricity as an attractive option. In addition, many of the hydrogen production-related concepts involve utilization of energy resources without the need for additional electrical transmission. For this reason, under Task 4, the EERC provided a summary of end uses for hydrogen in the region and focused on one end product in particular (fertilizer), including several process options and related economic analyses.

Brad G. Stevens, P.E.; Troy K. Simonsen; Kerryanne M. Leroux

2012-06-09T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Wild Horse 69-kV transmission line environmental assessment  

SciTech Connect (OSTI)

Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

NONE

1996-12-01T23:59:59.000Z

122

Electrical and Biological Effects of Transmission Lines: A Review.  

SciTech Connect (OSTI)

This review describes the electrical properties of a-c and d-c transmission lines and the resulting effects on plants, animals, and people. Methods used by BPA to mitigate undesirable effects are also discussed. Although much of the information in this review pertains to high-voltage transmission lines, information on distribution lines and electrical appliances is included. The electrical properties discussed are electric and magnetic fields and corona: first for alternating-current (a-c) lines, then for direct current (d-c).

Lee, Jack M.

1989-06-01T23:59:59.000Z

123

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect (OSTI)

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

Not Available

1992-04-01T23:59:59.000Z

124

Regulations for Electric Transmission and Fuel Gas Transmission Lines Ten or More Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct an electric or gas transmission line that is more than ten miles long must file documents describing the construction plans and potential land use and...

125

COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING  

E-Print Network [OSTI]

line are the data sources for this scheme. The paper derives a specific feature which equals to zero sys- tem based approach is described in (Girgis and Johns, 1996) and a phasor measurement unit (PMU of the data for this approach. Data from both ends of transmission line are used to achieve high accuracy

126

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZHolland, Illinois:5717551°Farms Ltd Jump to:Southline Transmission

127

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun DengWISP SignInWhoWilliston to Stateline

128

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet AssistanceCatalytic SitesEmployee,Energy

129

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareers Apply for a JobBernardtheBeyond(PrincetonBiddingBang or

130

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress. 16 figures.

Tuckerman, D.B.

1991-05-21T23:59:59.000Z

131

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress.

Tuckerman, David B. (Livermore, CA)

1991-01-01T23:59:59.000Z

132

Joint transmission system projects to improve system reliability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

County PUD, 425-783-8444 Joint transmission system projects to improve system reliability First major regional electric grid improvements in decades prepare the area for the...

133

Discontinuities in transmission lines and wave guides  

E-Print Network [OSTI]

transmission 11ne: nd cosx1sl cables have discrete support and separators. These suoports may be either d1electrics or conductors. In general the support" are desicned to introduce no discontinuity at one freouenCy, hut at other frequencies, they do...=- formin~ ths t of s he 1 ix. Co-xl l cable HC-6 r ansmi as 1 on 1 1 re in t hs f orm 5/U with t 1 e 1nner conductor in the form of s helix with ch:racter1st1c 1mpedance of 95C ohms has been manufactured. The aut hor hs c made h1ph- 1mpedance cable...

Mathis, Harold Fletcher

2012-06-07T23:59:59.000Z

134

An empirical study of the economies of scale in AC transmission line construction costs  

E-Print Network [OSTI]

of the logarithm of the cost per unit capacity per unit length against various explanatory parameters: · the year is to empirically evaluate the cost of transmission projects built in the United States in the last decade using capacity of the line. That is, the cost per unit nominal capacity per unit length is roughly constant over

Baldick, Ross

135

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

136

Multimode circuit QED with hybrid metamaterial transmission lines  

E-Print Network [OSTI]

Quantum transmission lines are a central to superconducting and hybrid quantum computing. Parallel to these developments are those of left-handed meta-materials. They have a wide variety of applications in photonics from the microwave to the visible range such as invisibility cloaks and perfect flat lenses. For classical guided microwaves, left-handed transmission lines have been proposed and studied on the macroscopic scale. We combine these ideas in presenting a left-handed/right-handed hybrid transmission line for applications in quantum optics on a chip. The resulting system allows circuit QED to reach a new regime: multi-mode ultra-strong coupling. Out of the many potential applications of this novel device, we discuss two; the preparation of multipartite entangled states and its use as a quantum simulator for the spin-boson model where a quantum phase transition is reached up to finite size-effects.

Daniel J. Egger; Frank K. Wilhelm

2013-11-07T23:59:59.000Z

137

Characterization of Co-planar Silicon Transmission Lines with and without Slow-waveEffect  

E-Print Network [OSTI]

Characterization of Co-planar Silicon Transmission Lines with and without Slow-waveEffect Woopoung and package transmission lines has been explained showing that the slow-wave mode cannot be represented only][2][3][4], characterization methods for package transmission lines have been applied to silicon transmission lines under

Swaminathan, Madhavan

138

TLSync: Support for Multiple Fast Barriers Using On-Chip Transmission Lines  

E-Print Network [OSTI]

TLSync: Support for Multiple Fast Barriers Using On-Chip Transmission Lines Jungju Oh jungju in a transmission-line broadcast network, thus leaving the transmission line network free for non-modulated (base--Interconnection architectures General Terms Design, Performance Keywords Multi-core, Synchronization, Barrier, Transmission Line

Prvulovic, Milos

139

A Study on Crosstalk Analysis in Aggregative Transmission Lines with Turning Vias Tapobrata Bandyopadhyay1  

E-Print Network [OSTI]

A Study on Crosstalk Analysis in Aggregative Transmission Lines with Turning Vias Tapobrata and signal integrity in high-speed signal channels is extremely important. Transmission lines and vias transmission lines (4 mil width) of different lengths arranged in bundles. The eight transmission line bundles

Swaminathan, Madhavan

140

PHYSICAL REVIEW B 88, 219904(E) (2013) Erratum: Parametric amplification in Josephson junction embedded transmission lines  

E-Print Network [OSTI]

embedded transmission lines [Phys. Rev. B 87, 144301 (2013)] Oded Yaakobi, Lazar Friedland, Chris Macklin

Friedland, Lazar

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Transmission Line Jobs and Economic Development Impact (JEDI) Model User Reference Guide  

SciTech Connect (OSTI)

The Jobs and Economic Development Impact (JEDI) models, developed through the National Renewable Energy Laboratory (NREL), are freely available, user-friendly tools that estimate the potential economic impacts of constructing and operating power generation projects for a range of conventional and renewable energy technologies. The Transmission Line JEDI model can be used to field questions about the economic impacts of transmission lines in a given state, region, or local community. This Transmission Line JEDI User Reference Guide was developed to provide basic instruction on operating the model and understanding the results. This guide also provides information on the model's underlying methodology, as well as the parameters and references used to develop the cost data contained in the model.

Goldberg, M.; Keyser, D.

2013-10-01T23:59:59.000Z

142

Damping of bending waves in truss beams by electrical transmission lines with PZT actuators  

E-Print Network [OSTI]

Damping of bending waves in truss beams by electrical transmission lines with PZT actuators F. dell of the truss beam with an electrical transmission line by a line distribution of PZT actuators. It has been-order transmission line, and that such a line is not suitable to damp bending waves. In the present paper, we propose

Boyer, Edmond

143

RESONANCES FOR MICROSTRIP TRANSMISSION LINES HABIB AMMARI y AND FAOUZI TRIKI y  

E-Print Network [OSTI]

RESONANCES FOR MICROSTRIP TRANSMISSION LINES #3; HABIB AMMARI y AND FAOUZI TRIKI y Abstract of the line goes to zero. Key words. microstrip transmission lines, waveguides, resonances, characteristic in mi- crostrip transmission lines mounted on planar open waveguides. Microstrip transmis- sion lines

Ammari, Habib

144

EIS-0008-S: Supplement, Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this SEIS to evaluate the environmental impacts of construction of a steel double-circuit 345-kilovolt transmission line from Moore Substation near Littleton, New Hampshire, to Comerford Substation near Monroe, New Hampshire and a 345-kilovolt wood pole transmission line from Comerford Substation to Webster Substation near Franklin, New Hampshire, as part of the Dickey-Lincoln School Lakes Transmission Project. The Final SEIS consists entirely of Section 9 (Consultation and Coordination), which incorporates public and agency comments on the Draft SEIS and responses to those comments, as well as all necessary errata and addenda to the Draft SEIS. This SEIS is a supplement to DOE/EIS-008, Dickey-Lincoln School Lakes Transmission Project.

145

ECEN 720 High-Speed Links Circuits and Systems Lab1 -Transmission Lines  

E-Print Network [OSTI]

1 ECEN 720 High-Speed Links Circuits and Systems Lab1 - Transmission Lines Objective To learn transmission lines and time-domain refectometer (TDR). Introduction Wires are used to transmit clocks and data data communication chip design, the wires are often treated as transmission lines. Proper transmission

Palermo, Sam

146

Number and propagation of line outages in cascading events in electric power transmission systems  

E-Print Network [OSTI]

of transmission lines. We estimate from observed utility data how transmission line outages propagate, and obtain is consistent with the utility data by using it to estimate the distribution of the total number of lines statistical behavior of cascading transmission line outages from standard utility data that records the times

Dobson, Ian

147

An Inverse Problem for Toeplitz Matrices and the Synthesis of Discrete Transmission Lines  

E-Print Network [OSTI]

An Inverse Problem for Toeplitz Matrices and the Synthesis of Discrete Transmission Lines Russel E and inverse problems for a transmission line which consists of piecewise constant components. Knowing the impulse response of the transmission line, we can calculate the capaci- tance taper of the line, and vice

Allen, Jont

148

Calculation of Ramp Response of Lossy Transmission Lines Using Two-port Network Functions  

E-Print Network [OSTI]

1 Calculation of Ramp Response of Lossy Transmission Lines Using Two-port Network Functions Payam-port representation of the transmission line and accounts for the output resistance of the driver and the line response of lossy transmission line which expands the reciprocal of transfer function of the system

Pedram, Massoud

149

Optimized Waveform Relaxation Methods for the Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

1 Optimized Waveform Relaxation Methods for the Longitudinal Partitioning of Transmission Lines convergence. Here we consider transmission line circuits since they represent an important part of a Spice type circuit solver. For transmission lines, the coupling between different lines is relatively weak

Gander, Martin J.

150

Electric Utility Transmission and Distribution Line Engineering Program  

SciTech Connect (OSTI)

Economic development in the United States depends on a reliable and affordable power supply. The nation will need well educated engineers to design a modern, safe, secure, and reliable power grid for our future needs. An anticipated shortage of qualified engineers has caused considerable concern in many professional circles, and various steps are being taken nationwide to alleviate the potential shortage and ensure the North American power system's reliability, and our world-wide economic competitiveness. To help provide a well-educated and trained workforce which can sustain and modernize the nation's power grid, Gonzaga University's School of Engineering and Applied Science has established a five-course (15-credit hour) Certificate Program in Transmission and Distribution (T&D) Engineering. The program has been specifically designed to provide working utility engineering professionals with on-line access to advanced engineering courses which cover modern design practice with an industry-focused theoretical foundation. A total of twelve courses have been developed to-date and students may select any five in their area of interest for the T&D Certificate. As each course is developed and taught by a team of experienced engineers (from public and private utilities, consultants, and industry suppliers), students are provided a unique opportunity to interact directly with different industry experts over the eight weeks of each course. Course material incorporates advanced aspects of civil, electrical, and mechanical engineering disciplines that apply to power system design and are appropriate for graduate engineers. As such, target students for the certificate program include: (1) recent graduates with a Bachelor of Science Degree in an engineering field (civil, mechanical, electrical, etc.); (2) senior engineers moving from other fields to the utility industry (i.e. paper industry to utility engineering or project management positions); and (3) regular working professionals wishing to update their skills or increase their knowledge of utility engineering design practices and procedures. By providing graduate educational opportunities for the above groups, the T&D Program will help serve a strong industry need for training the next generation of engineers in the cost-effective design, construction, operation, and maintenance of modern electrical transmission and distribution systems. In addition to developing the on-line engineering courses described above, the T&D Program also focused significant efforts towards enhancing the training opportunities available to power system operators in the northwest. These efforts have included working with outside vendors to provide NERC-approved training courses in Gonzaga University's (GU) system operator training facility, support for an accurate system model which can be used in regional blackstart exercises, and the identification of a retired system operator who could provide actual regional training courses. The GU system operator training facility is also being used to recruit young workers, veterans, and various under-represented groups to the utility industry. Over the past three years students from Columbia Gorge Community College, Spokane Falls Community College, Walla Walla Community College, Central Washington University, Eastern Washington University, Gonzaga University, and various local high schools have attended short (one-day) system operator training courses free of charge. These collaboration efforts has been extremely well received by both students and industry, and meet T&D Program objectives of strengthening the power industry workforce while bridging the knowledge base across power worker categories, and recruiting new workers to replace a predominantly retirement age workforce. In the past three years the T&D Program has provided over 170 utility engineers with access to advanced engineering courses, been involved in training more than 300 power system operators, and provided well over 500 college and high school students with an experienc

Peter McKenny

2010-08-31T23:59:59.000Z

151

Proposed Project: Plains & Eastern Clean Line Transmission Line |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | Department ofThatGrid3 ProgramIDPromotingNo.

152

Analytical time domain electromagnetic field propagators and closed-form solutions for transmission lines  

E-Print Network [OSTI]

An analytical solution for the coupled telegrapher’s equations in terms of the voltage and current on a homogeneous lossy transmission line and multiconductor transmission line is presented. The resulting telegrapher’s equation solution is obtained...

Jeong, Jaehoon

2009-05-15T23:59:59.000Z

153

Non-Linear Transmission Lines for Pulse Shapingin Silicon Ehsan Afshari and Ali Hajimii  

E-Print Network [OSTI]

Non-Linear Transmission Lines for Pulse Shapingin Silicon Ehsan Afshari and Ali Hajimii California.Non-hear transmission lines (NLTLs)sharpening either of the rising or the Falling edge of a pulse have beenT. In this paper, the propagation of soliton waves in a non-linear transmission line will be studied. Then, we

Hajimiri, Ali

154

Transient Simulation of On-Chip Transmission Lines via Exact Pole Extraction  

E-Print Network [OSTI]

Transient Simulation of On-Chip Transmission Lines via Exact Pole Extraction Guoqing Chen and Eby G response at the far end of a transmission line is proposed in this paper. Unlike approximating the poles, on-chip interconnects exhibit significant transmission line behavior. An efficient solution

Friedman, Eby G.

155

Minimizing Simultaneous Switching Noise at Reduced Power with Power Transmission Lines for  

E-Print Network [OSTI]

Minimizing Simultaneous Switching Noise at Reduced Power with Power Transmission Lines for High] by replacing the power plane structure with a power transmission line (PTL). In this paper, a new power switching noise; power transmission line I. INTRODUCTION The rapid increase in data rates and transistor

Swaminathan, Madhavan

156

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES  

E-Print Network [OSTI]

AN INFINITE DIMENSIONAL DESCRIPTOR SYSTEM MODEL FOR ELECTRICAL CIRCUITS WITH TRANSMISSION LINES TIMO REIS Abstract. In this paper a model of linear electrical circuits with transmission lines is de-coupled with the telegraph equations who describe the behavior of the transmission lines. The resulting system of equations

Reis, Timo

157

A new expression for the ground transient resistance matrix elements of multiconductor overhead transmission lines  

E-Print Network [OSTI]

transmission lines F. Rachidi a, *, S.L. Loyka b , C.A. Nucci c , M. Ianoz a a Swiss Federal Institute The ground impedance matrix elements of a multiconductor overhead transmission line do not have analytical-singular, and which describe, within the limits of transmission line theory, both the early-time and late

Loyka, Sergey

158

ECEN 720 High-Speed Links: Circuits and Systems Lab1 -Transmission Lines  

E-Print Network [OSTI]

1 ECEN 720 High-Speed Links: Circuits and Systems Lab1 - Transmission Lines Objective To learn about transmission lines and time-domain reflectometer (TDR). Introduction Wires are used to transmit. In high speed data communication chip design, the wires are often treated as transmission lines. Proper

Palermo, Sam

159

Longitudinal Partitioning Based Waveform Relaxation Algorithm for Transient Analysis of Long Delay Transmission Lines  

E-Print Network [OSTI]

Transmission Lines Sourajeet Roy and Anestis Dounavis Department of Electrical and Computer Engineering networks. The proposed methodology represents lossy transmission lines as a cascade of lumped circuit of characteristics. This allows the transmission line to be naturally partitioned into smaller, weakly coupled

Roy, Sourajeet

160

Multilayer Coplanar Waveguide Transmission Lines Compatible with Standard Digital Silicon Technologies  

E-Print Network [OSTI]

Multilayer Coplanar Waveguide Transmission Lines Compatible with Standard Digital Silicon, Email: hwu@ece.rochester.edu Abstract-- On-chip transmission lines in silicon technologies suffer from. In this paper, we demonstrate that multilayer coplanar waveguide (MCPW) transmission lines can be utilized

Wu, Hui

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Multistability in nonlinear left-handed transmission lines David A. Powell,a  

E-Print Network [OSTI]

Multistability in nonlinear left-handed transmission lines David A. Powell,a Ilya V. Shadrivov; published online 2 July 2008 Employing a nonlinear left-handed transmission line as a model system, we, which at higher power may result in chaotic dynamics of the transmission line. © 2008 American Institute

162

Field quality measurements of a 2-Tesla transmission line magnet  

SciTech Connect (OSTI)

A prototype 2-Tesla superconducting transmission line magnet for future hadron colliders was designed, built and tested at Fermilab. The 1.5 m long, combined-function gradient-dipole magnet has a vertical pole aperture of 20 mm. To measure the magnetic field quality in such a small magnet aperture, a specialized rotating coil of 15.2 mm diameter, 0.69 m long was fabricated. Using this probe, a program of magnetic field quality measurements was successfully performed. Results of the measurements are presented and discussed.

Velev, G.V.; Foster, W.; Kashikhin, V.; Mazur, P.; Oleck, A.; Piekarz, H.; Schlabach, P.; Sylvester, C.; /Fermilab; Wake, M.; /KEK, Tsukuba

2005-09-01T23:59:59.000Z

163

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH  

E-Print Network [OSTI]

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH Subject: Project Schedule Project Duration: May 27 to August 10, 2014 The sewer line will be constructed in phases

Ickert-Bond, Steffi

164

EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

165

EIS-0112: Rifle to San Juan 345-kV Transmission Line and Associated Facilities  

Broader source: Energy.gov [DOE]

The U.S. Department of Agriculture - Rural Electrification Administration developed this statement to evaluate the environmental impacts of the Colorado-Ute Electric Association Inc. and the U.s. Department of Energy's Western Area Power Administration (WAPA) constructing and operating a 345-kilovolt transmission line from Rifle, Colorado, to the San Juan Generating Station near Farmington, New Mexico. WAPA served as a cooperating agency in the preparation of this statement and adopted it on 10/30/1984. WAPA assumed the lead role for project implementation after issuance of the final statement.

166

744 IEEE JOURNAL OF SOLID-STATE CIRCUITS, VOL. 40, NO. 3, MARCH 2005 Nonlinear Transmission Lines  

E-Print Network [OSTI]

744 IEEE JOURNAL OF SOLID-STATE CIRCUITS, VOL. 40, NO. 3, MARCH 2005 Nonlinear Transmission Lines--Nonlinear transmission lines (NLTL) are used for pulse shaping. We developed the theory of pulse propagation through sharpening, nonlinear effects, nonlinear transmission lines, pulse shaping, soli- tons, transmission lines. I

Afshari, Ehsan

167

Meteorological conditions associated with the full-span galloping oscillations of overhead transmission lines  

E-Print Network [OSTI]

transmission lines J. C.R. Hunt, M.A., Ph.D., A.F.I.M.A., and M.D. Rowbottom,B.Sc., PhJD., A.F.I.M.A. Indexing transmission lines over a 7-year period have been correlated in the form of histograms of number of faults-span galloping oscillations of ice-accreted bundled overhead transmission lines. The main assumption made

Hunt, Julian

168

Non-transposed, three phase transmission lines: a study of their effect on load voltages.  

E-Print Network [OSTI]

TRANSMISSION LINES A S'PJDY OF THEIR EFFECT ON LOAD VOLTAGES A Thesis By Robert Dean Chenoweth August 1951 NON-TRANSPOSED~ THREE PHASE TRANSMISSION LINES A STUDY OF THEIR EFFECT ON LOAD VOLTAGES A Thesis Submitted to the Faculty of the Agricultural... all large blocks of alternating current power are transmitted from the generating station to the load by means of three phase transmission lines. With present day equipment this method is economical and when ~ properly designed gives very...

Chenoweth, Robert Dean

1951-01-01T23:59:59.000Z

169

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Broader source: Energy.gov [DOE]

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

170

Forced cooling of underground electric power transmission lines : design manual  

E-Print Network [OSTI]

The methodology utilized for the design of a forced-cooled pipe-type underground transmission system is presented. The material is divided into three major parts: (1) The Forced-cooled Pipe-Type Underground Transmission ...

Brown, Jay A.

1978-01-01T23:59:59.000Z

171

Miter bend loss and higher order mode content measurements in overmoded millimeter-wave transmission lines  

E-Print Network [OSTI]

High power applications require an accurate calculation of the losses on overmoded corrugated cylindrical transmission lines. Previous assessments of power loss on these lines have not considered beam polarization or higher ...

Kowalski, Elizabeth J. (Elizabeth Joan)

2010-01-01T23:59:59.000Z

172

Precision electron flow measurements in a disk transmission line.  

SciTech Connect (OSTI)

An analytic model for electron flow in a system driving a fixed inductive load is described and evaluated with particle in cell simulations. The simple model allows determining the impedance profile for a magnetically insulated transmission line given the minimum gap desired, and the lumped inductance inside the transition to the minimum gap. The model allows specifying the relative electron flow along the power flow direction, including cases where the fractional electron flow decreases in the power flow direction. The electrons are able to return to the cathode because they gain energy from the temporally rising magnetic field. The simulations were done with small cell size to reduce numerical heating. An experiment to compare electron flow to the simulations was done. The measured electron flow is {approx}33% of the value from the simulations. The discrepancy is assumed to be due to a reversed electric field at the cathode because of the inductive load and falling electron drift velocity in the power flow direction. The simulations constrain the cathode electric field to zero, which gives the highest possible electron flow.

Clark, Waylon T.; Pelock, Michael D.; Martin, Jeremy Paul; Jackson, Daniel Peter Jr.; Savage, Mark Edward; Stoltzfus, Brian Scott; Mendel, Clifford Will, Jr.; Pointon, Timothy David

2008-01-01T23:59:59.000Z

173

INSTRUMENTATION FOR SURVEYING ACOUSTIC SIGNALS IN NATURAL GAS TRANSMISSION LINES  

SciTech Connect (OSTI)

In the U.S. natural gas is distributed through more than one million miles of high-pressure transmission pipelines. If all leaks and infringements could be detected quickly, it would enhance safety and U.S. energy security. Only low frequency acoustic waves appear to be detectable over distances up to 60 km where pipeline shut-off valves provide access to the inside of the pipeline. This paper describes a Portable Acoustic Monitoring Package (PAMP) developed to record and identify acoustic signals characteristic of: leaks, pump noise, valve and flow metering noise, third party infringement, manual pipeline water and gas blow-off, etc. This PAMP consists of a stainless steel 1/2 inch NPT plumbing tree rated for use on 1000 psi pipelines. Its instrumentation is designed to measure acoustic waves over the entire frequency range from zero to 16,000 Hz by means of four instruments: (1) microphone, (2) 3-inch water full range differential pressure transducer with 0.1% of range sensitivity, (3) a novel 3 inch to 100 inch water range amplifier, using an accumulator with needle valve and (4) a line-pressure transducer. The weight of the PAMP complete with all accessories is 36 pounds. This includes a remote control battery/switch box assembly on a 25-foot extension chord, a laptop data acquisition computer on a field table and a sun shield.

John L. Loth; Gary J. Morris; George M. Palmer; Richard Guiler; Deepak Mehra

2003-09-01T23:59:59.000Z

174

Radial transmission line analysis of multi-layer structures  

SciTech Connect (OSTI)

The analysis of multi-layer beam tubes is a standard problem and involves axially propagating waves. This treatment is ill suited to a short multi-layer structure such as the present example of a ferrite covered ceramic break in the beam tube at the ERL photo-cathode electron gun. This paper demonstrates that such structure can better be treated by radial wave propagation. The theoretical method is presented and numerical results are compared with measured network analyser data and Microwave Studio generated simulations. The results confirm the concept of radial transmission lines as a valid analytical method. An Energy Recovery Linac (ERL) is being constructed at this laboratory for the purpose of research towards an envisioned Electron Ion Collider. One of the pertinent topics is damping of Higher Order Modes (HOM). In this ERL, the damping is provided by ferrite absorbers in the beam tube. A modified version thereof, a ceramic break surrounded by ferrite, is planed for the superconducting electron gun. The damper here is located at room temperature just outside of the gun. If used in a cavity chain, the ceramic break is in the vacuum tube at helium temperature whereas the ferrite is moved into the cryostat insulating vacuum allowing higher temperatures. The general properties of the ferrite HOM dampers have been published but are more detailed in this paper.

Hahn, H.; Hammons, L.

2011-03-28T23:59:59.000Z

175

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada  

Broader source: Energy.gov [DOE]

This EIS, being prepared jointly by DOE’s Western Area Power Administration and the Department of the Interior’s Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project.

176

Omega Transmission Lines with Applications to Effective Medium Models of Metamaterials  

E-Print Network [OSTI]

In this paper we introduce the concept of transmission lines with inherent bi-anisotropy and establish an analogy between these lines and volumetric bi-anisotropic materials. In particular, we find under what conditions a periodically loaded transmission line can be treated as an effective omega medium. Two example circuits are introduced and analyzed. The results have two-fold implications: opening a route to emulate electromagnetic properties of bi-anisotropic omega media using transmission-line meshes and understanding and improving effective medium models of composite materials with the use of effective circuit models of unit cells.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

177

EIS-0166: Bangor Hydro-Electric Transmission Line, Maine  

Broader source: Energy.gov [DOE]

The Department of Energy prepared this environmental impact statement while considering whether to authorize a Presidential permit for Bangor Hydro to construct a new electric transmission facility at the U.S. border with Canada.

178

Josephson junction-embedded transmission-line resonators: from Kerr medium to in-line transmon  

E-Print Network [OSTI]

We provide a general method to find the Hamiltonian of a linear circuit in the presence of a nonlinearity. Focussing on the case of a Josephson junction embedded in a transmission-line resonator, we solve for the normal modes of the system by taking into account exactly the effect of the quadratic (i.e. inductive) part of the Josephson potential. The nonlinearity is then found to lead to self and cross-Kerr effect, as well as beam-splitter type interactions between modes. By adjusting the parameters of the circuit, the Kerr coefficient K can be made to reach values that are weak (K \\kappa) or even very strong (K >> \\kappa) with respect to the photon-loss rate \\kappa. In the latter case, the resonator+junction circuit corresponds to an in-line version of the transmon. By replacing the single junction by a SQUID, the Kerr coefficient can be tuned in-situ, allowing for example the fast generation of Schr\\"odinger cat states of microwave light. Finally, we explore the maximal strength of qubit-resonator coupling...

Bourassa, J; Gambetta, Jay M; Blais, A

2012-01-01T23:59:59.000Z

179

Analysis of dc harmonics using the three-pulse model for the intermountain power project HVDC transmission  

SciTech Connect (OSTI)

The harmonic analysis of the dc-side of an HVDC line transmission requires realistic models of the converters, the dc line, and other relevant equipment. These models must include all important paths for harmonic current, and appropriate sources of harmonic voltage generation. The classical converter modeling technique has been demonstrated to be insufficient in field measurements and analysis of the harmonic spectra found on recent HVDC line transmission. For this reason, a new model of the converter bridge which takes into account the major stray capacitances in the converter (the three-pulse model) has been developed, and is described in detail elsewhere. This paper presents comparisons between the classical and three-pulse calculations for the Intermountain Power Project (IPP) HVDC transmission. The calculation results from the three-pulse model agree favorably with the harmonics found in field measurements.

Dickmander, D.L.; Peterson, K.J.

1989-04-01T23:59:59.000Z

180

Sensor, method and system of monitoring transmission lines  

DOE Patents [OSTI]

An apparatus, method, and system for measuring the magnetic field produced by phase conductors in multi-phase power lines. The magnetic field measurements are used to determine the current load on the conductors. The magnetic fields are sensed by coils placed sufficiently proximate the lines to measure the voltage induced in the coils by the field without touching the lines. The x and y components of the magnetic fields are used to calculate the conductor sag, and then the sag data, along with the field strength data, can be used to calculate the current load on the line and the phase of the current. The sag calculations of this invention are independent of line voltage and line current measurements. The system applies a computerized fitter routine to measured and sampled voltages on the coils to accurately determine the values of parameters associated with the overhead phase conductors.

Syracuse, Steven J.; Clark, Roy; Halverson, Peter G.; Tesche, Frederick M.; Barlow, Charles V.

2012-10-02T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

The commercial development of water repellent coatings for high voltage transmission lines  

SciTech Connect (OSTI)

The purpose of the Cooperative Research and Development Agreement (CRADA) between UT-Battelle, LLC and Southwire Company was to jointly develop a low cost, commercially viable, water-repellant anti-icing coating system for high voltage transmission lines. Icing of power lines and other structures caused by freezing rain events occurs annually in the United States, and leads to severe and prolonged power outages. These outages cause untold economic and personal distress for many American families and businesses. Researchers at the Department of Energy s Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee have previously developed a set of superhydrophobic coatings with remarkable anti-icing properties that could potentially be sprayed or painted onto high-tension power lines and pylons. These coatings drastically reduce ice accumulation on these structures during freezing rain events. The project involved obtaining technical input, supplies and test high voltage cables from Southwire, along with the joint development of anti-icing coating techniques, which would result in a commercial license agreement between Southwire and ORNL, and potentially other companies requiring water repellent anti-icing coatings.

Hunter, Scott Robert [ORNL

2013-10-01T23:59:59.000Z

182

The commercial development of water repellent coatings for high voltage transmission lines  

SciTech Connect (OSTI)

The purpose of the Cooperative Research and Development Agreement (CRADA) between UT-Battelle, LLC and Southwire Company was to jointly develop a low cost, commercially viable, water-repellant anti-icing coating system for high voltage transmission lines. Icing of power lines and other structures caused by freezing rain events occurs annually in the United States, and leads to severe and prolonged power outages. These outages cause untold economic and personal distress for many American families and businesses. Researchers at the Department of Energy?s Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee have previously developed a set of superhydrophobic coatings with remarkable anti-icing properties that could potentially be sprayed or painted onto high-tension power lines and pylons. These coatings drastically reduce ice accumulation on these structures during freezing rain events. The project involved obtaining technical input, supplies and test high voltage cables from Southwire, along with the joint development of anti-icing coating techniques, which would result in a commercial license agreement between Southwire and ORNL, and potentially other companies requiring water repellent anti-icing coatings.

Hunter, S. R. [ORNL] [ORNL; Daniel, A. [Southwire Company] [Southwire Company

2013-10-31T23:59:59.000Z

183

Using Dielectric Losses to De-Ice Power Transmission Lines with 100 kHz High-Voltage  

E-Print Network [OSTI]

Using Dielectric Losses to De-Ice Power Transmission Lines with 100 kHz High-Voltage Excitation J DIELECTRIC LOSSES TO DE-ICE POWER TRANSMISSION LINES . . . 1 Using Dielectric Losses to De-Ice Power Transmission Lines with 100 kHz High-Voltage Excitation Joshua D. McCurdy, Charles R. Sullivan and Victor F

184

The mesa merging oxidation method for creating low-loss dielectrics and transmission lines on low-resistivity silicon  

E-Print Network [OSTI]

The mesa merging oxidation method for creating low-loss dielectrics and transmission lines on low.1088/0960-1317/21/6/065020 The mesa merging oxidation method for creating low-loss dielectrics and transmission lines on low steps to create high aspect ratio coplanar waveguide (hicoplanar) transmission lines. The large SiO2

Bowers, John

185

Simulation of Eye-Diagrams on Lossy Transmission Lines using Extracted Data from 1-port TDR Measurements  

E-Print Network [OSTI]

Simulation of Eye-Diagrams on Lossy Transmission Lines using Extracted Data from 1-port TDR of transmission lines were measured from 1- port TDR measurements. Using the extracted data, eye- diagrams of lossy transmission lines were simulated based on a non-physical RLGC model. Conventional W element

Swaminathan, Madhavan

186

650 IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 26, NO. 2, APRIL 2011 Hourly Scheduling of DC Transmission Lines in  

E-Print Network [OSTI]

Transmission Lines in SCUC With Voltage Source Converters Azim Lotfjou, Mohammad Shahidehpour, Fellow, IEEE transmission lines, se- curity-constrained unit commitment, voltage-source converters. NOMENCLATURE Index of ac;LOTFJOU et al.: HOURLY SCHEDULING OF DC TRANSMISSION LINES 651 , Vector of real and reactive power

Fu, Yong

187

IEEE TRANSACTIONS ON MICROWAVE THEORY AND TECHNIQUES, VOL. 45, NO. 6, JUNE 1997 939 Characteristics of Coplanar Transmission Lines on  

E-Print Network [OSTI]

of Coplanar Transmission Lines on Multilayer Substrates: Modeling and Experiments Erli Chen and Stephen Y. Chou, Senior Member, IEEE Abstract-- Characteristics of coplanar transmission lines on multilayer of these for- mulas has been verified experimentally on a variety of copla- nar transmission lines using

188

736 IEEE TRANSACTIONS ON ADVANCED PACKAGING, VOL. 28, NO. 4, NOVEMBER 2005 Simulation of Lossy Package Transmission Lines  

E-Print Network [OSTI]

Package Transmission Lines Using Extracted Data From One-Port TDR Measurements and Nonphysical RLGC Models, the frequency-dependent characteristic impedance and propagation constant of lossy transmission lines have been ( ), conductance ( ) and capacitance ( ) (RLGC) models have been developed for simulating lossy transmission lines

Swaminathan, Madhavan

189

Minimizing Simultaneous Switching Noise at Reduced Power with Constant-Voltage Power Transmission Lines for High-Speed Signaling  

E-Print Network [OSTI]

plane structure with a power transmission line (PTL). In this paper, a new power delivery scheme called Constant Voltage Power Transmission Line (CV-PTL) is shown to significantly reduce switching noise while, and measurements. Keywords Power delivery network, simultaneous switching noise, power transmission line 1

Swaminathan, Madhavan

190

On the Design and Implementation of Transmission Lines in Commercial SiGe HBT BiCMOS Processes  

E-Print Network [OSTI]

On the Design and Implementation of Transmission Lines in Commercial SiGe HBT BiCMOS Processes Matt the feasibility of implement- ing transmission lines in a commercially-available SiGe HBT BiCMOS technology. Thin film microstrip transmission lines using the top and bottom metalization layers (with a 3.24 ¡ m

Papapolymerou, Ioannis "John"

191

Regulations for Gas Transmission Lines Less than Ten Miles Long (New York)  

Broader source: Energy.gov [DOE]

Any person who wishes to construct a gas transmission line that is less than ten miles long must file documents describing the construction plans and potential land use and environmental impacts of...

192

Calculation and measurement of higher order mode losses in ITER ECH transmission lines  

E-Print Network [OSTI]

The ITER transmission lines (TLs) must be designed to deliver 20 MW from a 24 MW, 170 GHz gyrotron system. Miter bends are the main source of loss for these highly overmoded, corrugated, cylindrical waveguide TLs. Previous ...

Temkin, Richard J.

193

EIS-0399: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line  

Broader source: Energy.gov [DOE]

DOE, jointly with the Montana Department of Environmental Quality (MDEQ), prepared an EIS that evaluated the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana.

194

EIS-0078: Jonesboro-Hergett 161-kV Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Southwestern Power Administration developed this statement to assess the environmental and socioeconomic impacts of a 161-kilovolt transmission line in Craighead County, Arkansas, including its proposed and alternate routes.

195

Renewable portfolio standards, Greenhouse gas reduction, and Long-Line transmission investments in the WECC  

SciTech Connect (OSTI)

New, long-distance transmission lines to remote areas with concentrations of high-quality renewable resources can help western states meet the challenges of increasing renewable energy procurement and reducing greenhouse gas emissions more cost-effectively than reliance on local resources alone. The approach applied here to the Western Electricity Coordinating Council is useful for an initial determination of the net benefits of long-line transmission between regions with heterogeneous resource quality. (author)

Olson, Arne; Orans, Ren; Allen, Doug; Moore, Jack; Woo, C.K.

2009-11-15T23:59:59.000Z

196

Study of Compact Tunable Filters Using Negative Refractive Index Transmission Lines  

E-Print Network [OSTI]

1 STUDY OF COMPACT TUNABLE FILTERS USING NEGATIVE REFRACTIVE INDEX TRANSMISSION LINES A Thesis by BRIAN PATRICK LEWIS Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment... Brian Patrick Lewis 3 STUDY OF COMPACT TUNABLE FILTERS USING NEGATIVE REFRACTIVE INDEX TRANSMISSION LINES A Thesis by BRIAN PATRICK LEWIS Submitted to the Office of Graduate Studies of Texas A&M University in partial...

Lewis, Brian Patrick

2011-08-08T23:59:59.000Z

197

Electric Companies and Electric Transmission Lines (North Dakota)  

Broader source: Energy.gov [DOE]

The Public Service Commission has the authority to regulate the construction, operation, and maintenance of electrical supply lines, and to issue additional rules for this purpose. Section 49-21.1...

198

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy Savers [EERE]

Section 5 of the Flood Control Act of 1944 (16 U.S.C. 825s) to market and transmit wholesale electrical power from 24 multipurpose reservoir projects operated by the U.S. Army...

199

EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line  

Broader source: Energy.gov [DOE]

The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

200

BPA, Transmission, I-5 Corridor Reinforcement Project Update...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Update November 2012 Preferred alternative The draft EIS describes the proposed project and why it is needed, discusses the environmental impacts the project would create,...

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Study of transmission line attenuation in broad band millimeter wave frequency range  

SciTech Connect (OSTI)

Broad band millimeter wave transmission lines are used in fusion plasma diagnostics such as electron cyclotron emission (ECE), electron cyclotron absorption, reflectometry and interferometry systems. In particular, the ECE diagnostic for ITER will require efficient transmission over an ultra wide band, 100 to 1000 GHz. A circular corrugated waveguide transmission line is a prospective candidate to transmit such wide band with low attenuation. To evaluate this system, experiments of transmission line attenuation were performed and compared with theoretical loss calculations. A millimeter wave Michelson interferometer and a liquid nitrogen black body source are used to perform all the experiments. Atmospheric water vapor lines and continuum absorption within this band are reported. Ohmic attenuation in corrugated waveguide is very low; however, there is Bragg scattering and higher order mode conversion that can cause significant attenuation in this transmission line. The attenuation due to miter bends, gaps, joints, and curvature are estimated. The measured attenuation of 15 m length with seven miter bends and eighteen joints is 1 dB at low frequency (300 GHz) and 10 dB at high frequency (900 GHz), respectively.

Pandya, Hitesh Kumar B. [ITER-India, IPR, Gandhinagar, Gujarat (India)] [ITER-India, IPR, Gandhinagar, Gujarat (India); Austin, M. E. [Institute for Fusion Studies, the University of Texas at Austin, Austin, Texas (United States)] [Institute for Fusion Studies, the University of Texas at Austin, Austin, Texas (United States); Ellis, R. F. [Laboratory for Plasma and Fusion Energy Studies, University of Maryland, College Park, Maryland 20742 (United States)] [Laboratory for Plasma and Fusion Energy Studies, University of Maryland, College Park, Maryland 20742 (United States)

2013-10-15T23:59:59.000Z

202

Sierra Pacific Power Company Alturas Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

to prevent or e emissions of figitive dust during construction. Sierra County, Air Pollution Control District and Washoe County District Hdth Department's Alr Quality Management...

203

EIS-0463: Northern Pass Transmission Line Project, New Hampshire |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThis EISStatementUtah, andto Conduct ScopingDepartment of

204

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThis EISStatementUtah,Department

205

EIS-0499: Great Northern Transmission Line Project, Minnesota | Department  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement | Department of333Energy SUMMARY

206

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement | Department of333Energy

207

Northern Pass Transmission Line Project Environmental Impact Statement:  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2EnergyDepartment ofNewsNortheastB O N N E V I L L

208

Proposed Southline Transmission Line Project - Volume 2 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.2

209

Proposed Southline Transmission Line Project - Volume 3 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.23

210

Proposed Southline Transmission Line Project - Volume 4 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.234

211

Proposed Southline Transmission Line Project - Volume 4 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.234

212

Proposed Southline Transmission Line Project - Volume 4 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.234

213

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration - Rocky Mountain Lovell-Yellowtail

214

A projective Simson line Geoff Smith, University of Bath  

E-Print Network [OSTI]

A projective Simson line Geoff Smith, University of Bath 15th October 2014 This is a preprint-profit making educational or research pur- poses. c G. C. Smith October 15 2014 Introduction Let ABC

Smith, Geoff

215

A test of a 2 Tesla superconducting transmission line magnet system  

SciTech Connect (OSTI)

Superconducting transmission line magnet test system for an injector accelerator of a staged VLHC proton-proton colliding beam accelerator has been built and operated at Fermilab. The 1.5 m long, twin-aperture, combined function dipole magnet of 2 Tesla field is excited by a single turn 100 kA transmission line superconductor. The 100 kA dc current is generated using dc-dc switching converters powered by a bulk 240 kW supply. A pair of horizontally placed conventional leads facilitates transfer of this current to the magnet transmission line superconductor operating at liquid helium temperature. Fabrication of magnet components and magnet assembly work are described. The magnet test system and its operation are presented, and the performance is summarized.

Piekarz, Henryk; Carcagno, Ruben; Claypool, Brad; Foster, George W.; Hays, Steven L.; Huang, Yuenian; Kashikhin, Vladimir; Malamud, Ernest; Mazur, Peter O.; Nehring,; Oleck, Andrew; Rabehl, Roger; Schlabach, Phil; Sylvester, Cosmore; Velev, Gueorgui; Volk, James; /Fermilab; Wake, Masayoshi; /KEK, Tsukuba

2005-09-01T23:59:59.000Z

216

Non-Linear Transmission Line (NLTL) Microwave Source Lecture Notes the United States Particle Accelerator School  

SciTech Connect (OSTI)

We will quickly go through the history of the non-linear transmission lines (NLTLs). We will describe how they work, how they are modeled and how they are designed. Note that the field of high power, NLTL microwave sources is still under development, so this is just a snap shot of their current state. Topics discussed are: (1) Introduction to solitons and the KdV equation; (2) The lumped element non-linear transmission line; (3) Solution of the KdV equation; (4) Non-linear transmission lines at microwave frequencies; (5) Numerical methods for NLTL analysis; (6) Unipolar versus bipolar input; (7) High power NLTL pioneers; (8) Resistive versus reactive load; (9) Non-lineaer dielectrics; and (10) Effect of losses.

Russell, Steven J. [Los Alamos National Laboratory; Carlsten, Bruce E. [Los Alamos National Laboratory

2012-06-26T23:59:59.000Z

217

BPA, Transmission, I-5 Corridor Reinforcement Project factsheet...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

two-thirds of the electricity supply to serve the increasing population. These distant power generators rely on BPA's transmission system to move the electricity they produce to...

218

Power Transmission Lines: A New Interconnect Design to Eliminate Simultaneous Switching Noise A. Ege Engin and Madhavan Swaminathan  

E-Print Network [OSTI]

Power Transmission Lines: A New Interconnect Design to Eliminate Simultaneous Switching Noise A of the coupling between the signal lines and the power delivery network (PDN) in off-chip signaling. This coupling presents a new PDN design, called as the power transmission line, which overcomes these problems

Swaminathan, Madhavan

219

Measuring Hawking Radiation of a Kerr-Newman Black Hole in a Superconducting Transmission Line  

E-Print Network [OSTI]

Applying a dimensional reduction technique and a coordinates transformation approach, we deduce the Kerr-Newman space-time into a Painlev\\'{e}-like form, and obtain its corresponding event horizon and the Hawking radiation temperature. We find that, the event horizon of a Kerr-Newman black hole can be simulated in a superconducting transmission line. Moreover, by running some numerical simulation, we confirm that the Hawking radiation of a Kerr-Newman Black Hole can be experimentally measured in a superconducting transmission line.

X. G. Lan; D. Y. Chen; L. F. Wei

2014-03-21T23:59:59.000Z

220

Calculation of large ion densities under HVdc transmission lines by the finite difference method  

SciTech Connect (OSTI)

A calculation method for large ion densities (charged aerosols) under HVdc transmission lines was developed considering both the charging mechanism of aerosols by small ions and the drifting process by wind. Large ion densities calculated by this method agreed well with the ones measured under the Shiobara HVdc test line on the lateral profiles at ground level up to about 70m downwind from the line. Measured values decreased more quickly than calculated ones farther downwind from the line. Considering the effect of point discharge from ground cover (earth corona) improved the agreement in the farther downwind region.

Suda, Tomotaka; Sunaga, Yoshitaka [Central Research Institute of Electrical Power Industry, Komae, Tokyo (Japan)] [Central Research Institute of Electrical Power Industry, Komae, Tokyo (Japan)

1995-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Investigation of conductor swinging by wind and its application for design of compact transmission line  

SciTech Connect (OSTI)

In Japan it has recently become necessary to shorten the interphase spacing in overhead transmission lines because of land limitations and economical considerations. In this connection, the authors have attempted to analyze, in-depth, the possibilities of shortened interphase spacing via conductor swinging caused by wind effects: one of the important factors in the design of more compact overhead lines. This paper describes not only the investigative results of conductor swinging that were obtained both through computer simulation and in 3 years of full scale field line testing, but also design methodology for compact overhead lines based on these results.

Tsujimoto, K.; Fujii, K.; Kubokawa, H.; Okomura, T.; Simojima, K.; Yoshioka, V.

1982-11-01T23:59:59.000Z

222

Identification of ions near HVDC (high-voltage direct-current) transmission lines: Final report  

SciTech Connect (OSTI)

Positive and negative ion species were identified and studied at two separate field sites and one laboratory site. The first field study was conducted under an operating HVDC transmission line. The second was near a HVDC test line and measurements were performed with the line in both an energized and de-energized state. During clear, sunny days HSO/sub 4//sup /minus///center dot/H/sub 2/SO/sub 4/ was observed to be the dominant negative ion in the natural ion spectrum. At night, however, HSO/sub 4//sup /minus// core ions virtually disappeared, and were replaced by NO/sub 3//sup /minus// core ions and their first nitric acid cluster. Both negative spectra also typically contained lesser concentrations of the malonate ion. The transmission line negative spectra were similar but were typically dominated by the NO/sub 3//sup /minus// core ions during both day and night. The positive ions observed under HVDC lines were typically either NH/sub 4//sup +/ or C/sub 5/H/sub 6/N/sup +/, which reacted with higher proton affinity species (such as methylpyridines, trimethylamine and quinoline) farther from or in the absence of the transmission line. The observed differences between natural and anthropogenic ion spectra near HVDC lines are attributed primarily to a shortening of ion lifetimes by the strong electric field associated with the HVDC lines. One exception is the production of potassium and probably sodium based ions from the decomposition of insects in transmission line coronas. 22 refs., 29 figs.

Eisele, F.L.

1989-05-01T23:59:59.000Z

223

BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

United States. Bonneville Power Administration.

1995-08-01T23:59:59.000Z

224

Proceedings of the Inspection and Assessment of Overhead Transmission Line Equipment Workshop: 13-15 May 2003, Monterey, CA  

SciTech Connect (OSTI)

This report contains papers and materials presented at the Inspection and Assessment of Overhead Transmission Line Equipment Workshop held in Monterey, California in May of 2003.

None

2003-10-01T23:59:59.000Z

225

Automated transmission line fault analysis using synchronized sampling at two ends  

SciTech Connect (OSTI)

This paper introduces a new approach to fault analysis using synchronized sampling. A digital fault recorder with Global Positioning System (GPS) satellite receiver is the source of data for this approach. Fault analysis functions, such as fault detection, classification and location are implemented for a transmission line using synchronized samples from two ends of a line. This technique can be extremely fast, selective and accurate, providing fault analysis performance that can not easily be matched by other known techniques.

Kezunovic, M. [Texas A and M Univ., College Station, TX (United States)] [Texas A and M Univ., College Station, TX (United States); Perunicic, B. [Lamar Univ., Beaumont, TX (United States)] [Lamar Univ., Beaumont, TX (United States)

1996-02-01T23:59:59.000Z

226

Automated transmission line fault analysis using synchronized sampling at two ends  

SciTech Connect (OSTI)

This paper introduces a new approach to fault analysis using synchronized sampling. A digital fault recorder with Global Positioning System (GPS) satellite receiver is the source of data for this approach. Fault analysis functions, such as fault detection, classification and location are implemented for a transmission line using synchronized samples from two ends of a line. This technique can be extremely fast, selective and accurate, providing fault analysis performance that can not easily be matched by other known techniques.

Kezunovic, M. [Texas A and M Univ., College Station, TX (United States); Perunicic, B. [Lamar Univ., Beaumont, TX (United States)

1995-12-31T23:59:59.000Z

227

Availability of corona cage for predicting audible noise generated from HVDC transmission line  

SciTech Connect (OSTI)

This paper describes a prospect that a corona cage is available for predicting audible noise (AN) generated from HVDC transmission line. This is based on the assumption that generation quantities of AN and corona current are determined by Fmax (the true maximum conductor surface gradient in the presence of space charge) regardless of the surrounding electrode arrangement. This assumption has been verified by tests using corona cages and a test line.

Nakano, Y.; Sunaga, Y.

1989-04-01T23:59:59.000Z

228

Availabilty of corona cage for predicting radio interference generated from HVDC transmission line  

SciTech Connect (OSTI)

This paper describes a prospect that a corona cage is available for predicting radio interference (RI) generated from HVDC transmission lines. This is based on the assumption that the generation quantity of RI is determined by Fmax (the true maximum conductor surface gradient in the presence of space charge), regardless of surrounding electrode arrangement. This assumption has been verified by tests using corona cages and a test line.

Nakano, Y.; Sunaga, Y. (Central Research Inst. of Electric Power Industry, Tokyo (Japan))

1990-07-01T23:59:59.000Z

229

Control of Major-Accident Hazards Involving Land Transmission Charlotte BOUISSOU, Project Manager for Pipelines Risk Assessment  

E-Print Network [OSTI]

Control of Major-Accident Hazards Involving Land Transmission Pipelines Charlotte BOUISSOU, Project Nicolas DECHY, Project Manager for Accidents Analysis and Learning from Experience Contact : charlotte, this Directive does not apply to land transmission pipelines... According to several accidents analysis

Paris-Sud XI, Université de

230

EIS-0377: Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov [DOE]

A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission...

231

Department of Energy Finalizes Loan Guarantee for New Transmission...  

Office of Environmental Management (EM)

Nevada, improving grid reliability and efficiency. "As our country increases its use of alternative energy sources, new transmissions lines like the ON Line project will play a...

232

Three-dimensional isotropic perfect lens based on LC-loaded transmission lines  

E-Print Network [OSTI]

An isotropic three-dimentional perfect lens based on cubic meshes of interconnected transmission lines and bulk loads is proposed. The lens is formed by a slab of a loaded mesh placed in between two similar unloaded meshes. The dispersion equations and the characteristic impedances of the eigenwaves in the meshes are derived analytically, with an emphasis on generality. This allows designing of transmission-line meshes with desired dispersion properties. The required backward-wave mode of operation in the lens is realized with simple inductive and capacitive loads. An analytical expression for the transmission through the lens is derived and the amplification of evanescent waves is demonstrated. Factors that influence enhancement of evanescent waves in the lens are studied and the corresponding design criteria are established. A possible realization of the structure is outlined.

P. Alitalo; S. Maslovski; S. Tretyakov

2005-09-16T23:59:59.000Z

233

A MODIFIED TRANSMISSION LINE MODEL FOR LIGHTNING RETURN STROKE FIELD CALCULATIONS  

E-Print Network [OSTI]

- 229 - 44Hl A MODIFIED TRANSMISSION LINE MODEL FOR LIGHTNING RETURN STROKE FIELD CALCULATIONS V. The modifications considered differ from each other by the height dependent attenuation factor for the return stroke data available. Some problems with modeling of the early and late stages of the return stroke process

Florida, University of

234

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

235

EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability.

236

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington.

237

Entanglement of nitrogen-vacancy-center ensembles using transmission line resonators and a superconducting phase qubit  

SciTech Connect (OSTI)

We propose a potentially practical scheme for creating entanglement between two distant nitrogen-vacancy-center (N-V) spin ensembles using a current-biased Josephson junction superconducting qubit and transmission line resonators. The idea provides a scalable way to an N-V ensemble-based quantum network, which is close to the reach with currently available technology.

Yang, W. L.; Feng, M. [State Key Laboratory of Magnetic Resonance and Atomic and Molecular Physics, Wuhan Institute of Physics and Mathematics, Chinese Academy of Sciences, and Wuhan National Laboratory for Optoelectronics, Wuhan 430071 (China); Hu, Y. [Department of Physics, Huazhong University of Science and Technology, Wuhan 430074 (China); Yin, Z. Q. [Key Laboratory of Quantum Information, University of Science and Technology of China, Chinese Academy of Sciences, Hefei 230026 (China); Deng, Z. J. [Department of Physics, National University of Defense Technology, Changsha 410073 (China)

2011-02-15T23:59:59.000Z

238

EA-2007: Groton-Ordway 115-kV Transmission Line, Groton, South Dakota  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration (Upper Great Plains Region) is preparing an EA that assesses the potential environmental impacts of a proposal to construct a new 115-kV transmission line that would connect Western’s existing Groton and Ordway Substations near Groton, South Dakota.

239

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

SciTech Connect (OSTI)

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

2012-01-01T23:59:59.000Z

240

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review included an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands.

Woodford, D.

2011-02-01T23:59:59.000Z

242

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS); Hawaiian Islands Transmission Interconnection Project  

SciTech Connect (OSTI)

This report provides an independent review including an initial evaluation of the technical configuration and capital costs of establishing an undersea cable system and examining impacts to the existing electric transmission systems as a result of interconnecting the islands

Woodford, D.

2011-02-01T23:59:59.000Z

243

EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA  

Broader source: Energy.gov [DOE]

This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

244

EIS-0008: Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont  

Broader source: Energy.gov [DOE]

The U.S. Army Corps of Engineers and the U.S. Department of Energy's Bonneville Power Administration developed this statement to evaluate the environmental impacts of the Dickey-Lincoln School Lakes Transmission Project.

245

1076 IEEE TRANSACTIONS ON SMART GRID, VOL. 4, NO. 2, JUNE 2013 Wireless Network Design for Transmission Line  

E-Print Network [OSTI]

1076 IEEE TRANSACTIONS ON SMART GRID, VOL. 4, NO. 2, JUNE 2013 Wireless Network Design for Transmission Line Monitoring in Smart Grid Benazir Fateh, Student Member, IEEE, Manimaran Govindarasu, Senior for smart grid integration [2], [3]. Wireless sensor based monitoring of transmission lines provides

Manimaran, Govindarasu

246

GLIDES PROJECT GuideLines Into DEcision Support  

E-Print Network [OSTI]

GLIDES PROJECT GuideLines Into DEcision Support sponsored by The Agency for Healthcare Research;Topics · GLIDES 4-level "stack" ­ NarraAve guideline with quality, implementabilityLon, and local coding/linking ­ To Formal Quality Measure via QDM, eMeasure · BRIDGE

Lee, Daeyeol

247

AC and lightning performance of fiberglass crossarms aged in 115 kV transmission line  

SciTech Connect (OSTI)

This paper presents the results of an investigation of the electrical performance of 115 kV transmission line fiberglass cross-arm used by Mississippi Power and Light Company. A transmission line fiberglass crossarm removed from service and companion cross-arms outdoors but not in service were examined. The evaluation of electrical performance was based on flashover voltage value at AC voltage and standard lightning impulses as well as under dry and wet conditions. The tests were performed in the Mississippi State University High Voltage Laboratory. The obtained flashover voltages show no large differences in electrical strength of fiberglass crossarms removed from service and those stored outdoors. The Added CFO voltage by fiberglass crossarm to the porcelain suspension insulators is presented versus the length of the fiberglass crossarm for dry and wet conditions.

Grzybowski, S. (Mississippi State Univ., Mississippi State, MS (United States). Dept. of Electrical and Computer Engineering); Jenkins, E.B. (Entergy, New Orleans, LA (United States). Generation and Transmission Group)

1993-10-01T23:59:59.000Z

248

Coupling mid-infrared light from a photonic crystal waveguide to metallic transmission lines  

SciTech Connect (OSTI)

We propose and theoretically study a hybrid structure consisting of a photonic crystal waveguide (PhC-wg) and a two-wire metallic transmission line (TL), engineered for efficient transfer of mid-infrared (mid-IR) light between them. An efficiency of 32% is obtained for the coupling from the transverse magnetic (TM) photonic mode to the symmetric mode of the TL, with a predicted intensity enhancement factor of 53 at the transmission line surface. The strong coupling is explained by the small phase velocity mismatch and sufficient spatial overlapping between the modes. This hybrid structure could find applications in highly integrated mid-IR photonic-plasmonic devices for biological and gas sensing, among others.

Blanco-Redondo, Andrea, E-mail: andrea.blanco@tecnalia.com, E-mail: r.hillenbrand@nanogune.eu [ICT-European Software Institute Division, Tecnalia, Ibaizabal Bidea, Ed. 202, 48170 Zamudio, Bizkaia (Spain) [ICT-European Software Institute Division, Tecnalia, Ibaizabal Bidea, Ed. 202, 48170 Zamudio, Bizkaia (Spain); Dpto. Electronica y Telecom., E.T.S. Ingeniería Bilbao, UPV/EHU, Alda. Urquijo, 48103 Bilbao, Bizkaia (Spain); Sarriugarte, Paulo [Nanooptics Group, CIC nanoGUNE Consolider, 20018 Donostia–San Sebastian, Gipuzkoa (Spain)] [Nanooptics Group, CIC nanoGUNE Consolider, 20018 Donostia–San Sebastian, Gipuzkoa (Spain); Garcia-Adeva, Angel [Dpto. Fisica Aplicada I, E.T.S. Ingeniería de Bilbao, UPV-EHU, Alda. Urquijo, 48103 Bilbao, Bizkaia (Spain)] [Dpto. Fisica Aplicada I, E.T.S. Ingeniería de Bilbao, UPV-EHU, Alda. Urquijo, 48103 Bilbao, Bizkaia (Spain); Zubia, Joseba [Dpto. Electronica y Telecom., E.T.S. Ingeniería Bilbao, UPV/EHU, Alda. Urquijo, 48103 Bilbao, Bizkaia (Spain)] [Dpto. Electronica y Telecom., E.T.S. Ingeniería Bilbao, UPV/EHU, Alda. Urquijo, 48103 Bilbao, Bizkaia (Spain); Hillenbrand, Rainer, E-mail: andrea.blanco@tecnalia.com, E-mail: r.hillenbrand@nanogune.eu [Nanooptics Group, CIC nanoGUNE Consolider, 20018 Donostia–San Sebastian, Gipuzkoa (Spain) [Nanooptics Group, CIC nanoGUNE Consolider, 20018 Donostia–San Sebastian, Gipuzkoa (Spain); IKERBASQUE, Basque Foundation for Science, 48011 Bilbao, Bizkaia (Spain)

2014-01-06T23:59:59.000Z

249

Hybrid particle traps and conditioning procedure for gas insulated transmission lines  

DOE Patents [OSTI]

A gas insulated transmission line includes an outer sheath, an inner condor within the outer sheath, insulating supports supporting the inner conductor within the outer sheath, and an insulating gas electrically insulating the inner conductor from the outer sheath. An apertured particle trapping ring is disposed within the outer sheath, and the trapping ring has a pair of dielectric members secured at each longitudinal end thereof, with the dielectric members extending outwardly from the trapping ring along an arc. A support sheet having an adhesive coating thereon is secured to the trapping ring and disposed on the outer sheath within the low field region formed between the trapping ring and the outer sheath. A conditioning method used to condition the transmission line prior to activation in service comprises applying an AC voltage to the inner conductor in a plurality of voltage-time steps, with the voltage-time steps increasing in voltage magnitude while decreasing in time duration.

Dale, Steinar J. (Monroeville, PA); Cookson, Alan H. (Churchill, PA)

1982-01-01T23:59:59.000Z

250

Quantum transducers: Integrating Transmission Lines and Nanomechanical Resonators via Charge Qubits  

E-Print Network [OSTI]

We propose a mechanism to interface a transmission line resonator (TLR) with a nano-mechanical resonator (NAMR) by commonly coupling them to a charge qubit, a Cooper pair box with a controllable gate voltage. Integrated in this quantum transducer or simple quantum network, the charge qubit plays the role of a controllable quantum node coherently exchanging quantum information between the TLR and NAMR. With such an interface, a maser-like process is predicted to create a quasi-classical state of the NAMR by controlling a single-mode classical current in the TLR. Alternatively, a "Cooper pair" coherent output through the transmission line can be driven by a single-mode classical oscillation of the NAMR.

C. P. Sun; L. F. Wei; Yu-xi Liu; Franco Nori

2005-08-16T23:59:59.000Z

251

Modelling Quantum Mechanics by the Quantumlike Description of the Electric Signal Propagation in Transmission Lines  

E-Print Network [OSTI]

It is shown that the transmission line technology can be suitably used for simulating quantum mechanics. Using manageable and at the same time non-expensive technology, several quantum mechanical problems can be simulated for significant tutorial purposes. The electric signal envelope propagation through the line is governed by a Schrodinger-like equation for a complex function, representing the low-frequency component of the signal, In this preliminary analysis, we consider two classical examples, i.e. the Frank-Condon principle and the Ramsauer effect.

R. Fedele; M. A. Man'ko; V. I. Man'ko; V. G. Vaccaro

2002-07-30T23:59:59.000Z

252

Termination for a superconducting power transmission line including a horizontal cryogenic bushing  

DOE Patents [OSTI]

A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminates the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

Minati, Kurt F. (Northport, NY); Morgan, Gerry H. (Patchogue, NY); McNerney, Andrew J. (Shoreham, NY); Schauer, Felix (Upton, NY)

1984-01-01T23:59:59.000Z

253

Particle trap with dielectric barrier for use in gas insulated transmission lines  

DOE Patents [OSTI]

A gas-insulated transmission line includes an outer sheath, an inner conductor within the outer sheath, insulating supports supporting the inner conductor within the outer sheath, and an insulating gas electrically insulating the inner conductor from the outer sheath. An apertured particle trapping electrode is disposed within the outer sheath, and the electrode has a pair of dielectric members secured at each longitudinal end thereof, with the dielectric members extending outwardly from the apertured electrode.

Dale, Steinar J. (Monroeville, PA)

1982-01-01T23:59:59.000Z

254

EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line  

Broader source: Energy.gov [DOE]

DOE started to prepare, jointly with the Montana Department of Environmental Quality (MDEQ), an EA that would also serve as a state EIS. The document would evaluate the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana. Based on comments received on the DOE Draft EA/MDEQ Draft EIS, DOE cancelled preparation of the EA and announced preparation of DOE/EIS-0399 (of the same title).

255

Particle trap with dielectric barrier for use in gas insulated transmission lines  

DOE Patents [OSTI]

A gas-insulated transmission line includes an outer sheath, an inner conductor within the outer sheath, insulating supports supporting the inner conductor within the outer sheath, and an insulating gas electrically insulating the inner conductor from the outer sheath. An apertured particle trapping electrode is disposed within the outer sheath, and the electrode has a pair of dielectric members secured at each longitudinal end thereof, with the dielectric members extending outwardly from the apertured electrode. 7 figs.

Dale, S.J.

1982-06-15T23:59:59.000Z

256

Horizontal cryogenic bushing for the termination of a superconducting power-transmission line  

DOE Patents [OSTI]

A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminated the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

Minati, K.F.; Morgan, G.H.; McNerney, A.J.; Schauer, F.

1982-07-29T23:59:59.000Z

257

EIS-0365: Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov [DOE]

On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border.

258

EIS-0301: NRG Energy Services, Inc., Arizona-Baja California 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to approve NRG Energy, Inc. (NRG) for a Presidential permit to construct a 500,000-volt transmission line originating at the switchyard of the Palo Verde Nuclear Generating Station near Phoenix, Arizona, and extending approximately 177 miles to the southwest, where it would cross the United States (U.S.) border with Mexico in the vicinity of Calexico, California.

259

Bias-field controlled phasing and power combination of gyromagnetic nonlinear transmission lines  

SciTech Connect (OSTI)

Gyromagnetic Nonlinear Transmission Lines (NLTLs) generate microwaves through the damped gyromagnetic precession of the magnetic moments in ferrimagnetic material, and are thus utilized as compact, solid-state, frequency agile, high power microwave (HPM) sources. The output frequency of a NLTL can be adjusted by control of the externally applied bias field and incident voltage pulse without physical alteration to the structure of the device. This property provides a frequency tuning capability not seen in many conventional e-beam based HPM sources. The NLTLs developed and tested are mesoband sources capable of generating MW power levels in the L, S, and C bands of the microwave spectrum. For an individual NLTL the output power at a given frequency is determined by several factors including the intrinsic properties of the ferrimagnetic material and the transmission line structure. Hence, if higher power levels are to be achieved, it is necessary to combine the outputs of multiple NLTLs. This can be accomplished in free space using antennas or in a transmission line via a power combiner. Using a bias-field controlled delay, a transient, high voltage, coaxial, three port, power combiner was designed and tested. Experimental results are compared with the results of a transient COMSOL simulation to evaluate combiner performance.

Reale, D. V., E-mail: david.reale@ttu.edu; Bragg, J.-W. B.; Gonsalves, N. R.; Johnson, J. M.; Neuber, A. A.; Dickens, J. C.; Mankowski, J. J. [Center for Pulsed Power and Power Electronics, Texas Tech University, Lubbock, Texas 79409 (United States)

2014-05-15T23:59:59.000Z

260

Transmission Bottleneck Project Report. March 19, 2003 | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for TransmissionEnergy

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Multi-tower line focus Fresnel array project  

SciTech Connect (OSTI)

As an alternative to conventional tracking solar thermal trough systems, one may use line focus Fresnel reflector systems. In a conventional Fresnel reflector design, each field of reflectors is directed to a single tower. However efficient systems of very high ground utilisation can be setup if a field of reflectors uses multiple receivers on different towers. This paper describes a line focus system, called the compact linear fresnel reflector system and a project to produce an initial 95 MWth solar array. The array will be used as a retrofit preheater for a coal fired generating plant.

Mills, D.R.; Morrison, G.; Pye, J.; Le Lievre, P. [Solar Heat & Power SHP Pty. Ltd., Sydney, NSW (Australia)

2006-02-15T23:59:59.000Z

262

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

SciTech Connect (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitaton is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1988-01-01T23:59:59.000Z

263

Electromagnetic interference from transmission lines located in central region of Saudi Arabia  

SciTech Connect (OSTI)

This paper discusses the electromagnetic interference (EMI) generated by transmission lines operating in the Central Region of Saudi Arabia. These lines have operating voltages of 132, 230 and 380 kV and are located in a hot, dry arid desert land where precipitation is very low. Measurements of typical EMI characteristics such as frequency spectrum, lateral profile and statistical variation are performed for each type of line and results are analyzed. It is found that general noise characteristic of these lines are similar to those reported in the literature for other lines which are located in relatively wet environment. The results further show that if operating gradients are low, the increase of EMI due to rain is lower than 20 dB value usually observed. The presence of sand and dust storms does not increase EMI level in any appreciable manner. The fair weather EMI level of these lines can be predicted with reasonable accuracy by using the CIGRE formula. Results are also presented for power line carrier related EMI.

Al-Arainy, A.A.; Malik, N.H.; Abdul-Aal, L.N.

1989-01-01T23:59:59.000Z

264

Research and Design of a Sample Heater for Beam Line 6-2c Transmission X-ray Microscope  

SciTech Connect (OSTI)

There exists a need for environmental control of samples to be imaged by the Transmission X-Ray Microscope (TXM) at the SSRLs Beam Line 6-2c. In order to observe heat-driven chemical or morphological changes that normally occur in situ, microscopes require an additional component that effectively heats a given sample without heating any of the microscope elements. The confinement of the heat and other concerns about the heaters integrity limit which type of heater is appropriate for the TXM. The bulk of this research project entails researching different heating methods used previously in microscopes, but also in other industrial applications, with the goal of determining the best-fitting method, and finally in designing a preliminary sample heater.

Policht, Veronica; /Loyola U., Chicago /SLAC

2012-08-27T23:59:59.000Z

265

Effect of Pressure Transmission Lines on the Frequency Response of Pressure Transducers  

SciTech Connect (OSTI)

It is well known that the length and diameter of the transmission lines between a pressure transducer and the pressure source can significantly affect the dynamic frequency response of the transducer. A new lumped parameter model has been developed to predict the time and frequency response of any number of different transducers connected in parallel in a manifold. While the model is simple to apply, it can provide quantitative information given the transducer and transmission line characteristic parameters. More importantly, the model can be used to evaluate the measured, in-situ response. this provides the natural frequency and the effective damping which can then be used to generate a frequency response curve. The model is also useful for designing a new pressure transmission system, which will have the required frequency response. The model was qualified by comparison to measurements of the step-function pressure response of a number of different transducers and test installations. With the aid of the model, the system resonant frequency and damping can be determined. Additional damping can be added if necessary to prevent ringing of the signal and to assure an accurate pressure measurement with a flat frequency response. For all of the experimental systems evaluated in this work, the response at the natural frequency was significantly underdamped and ringing was observed. This means that to perform accurate measurements damping needs to be added to the system. It was observed that the use of flexible pressure lines versus hard lines does increase the damping and may therefore be useful in certain situations. Equations were developed to permit sizing an orifice to be added to the system to provide the necessary damping.

G.J. Kirouac

2000-11-13T23:59:59.000Z

266

Abstract -In this paper, new formulations for the energy dissipation of lossy transmission lines driven by CMOS inverters are provided, and a new  

E-Print Network [OSTI]

Abstract - In this paper, new formulations for the energy dissipation of lossy transmission lines for the driving-point impedance of lossy coupled transmission lines which itself is derived by solving Telegrapher the transmission line for a broad range of frequencies are synthesized. Experimental results show that the energy

Heydari, Payam

267

Group velocities in coplanar strip transmission lines on Si and Si/SiO2 /Si substrates measured using differential electro-optic sampling  

E-Print Network [OSTI]

Group velocities in coplanar strip transmission lines on Si and Si/SiO2 /Si substrates measured 1996; accepted for publication 26 August 1996 The group velocities in coplanar strip transmission lines-9 Velocity measurements have been previously carried out for coplanar transmission lines on a variety

268

IEEE TRANSACTIONS ON VERY LARGE SCALE INTEGRATION (VLSI) SYSTEMS, VOL. 15, NO. 12, DECEMBER 2007 1289 Efficient Modeling of Transmission Lines With  

E-Print Network [OSTI]

1289 Efficient Modeling of Transmission Lines With Electromagnetic Wave Coupling by Using the Finite the transmission line with radiated electromagnetic (EM) wave noise coupling. A discrete modeling approach, the FDQ method adapts coarse grid points along the transmission line to compute the finite difference between

Mazumder, Pinaki

269

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 34-mile Midway-Moxee transmission line in Benton and Yakima Counties, Washington.

270

Particle trap to sheath contact for a gas-insulated transmission line having a corrugated outer conductor  

DOE Patents [OSTI]

A particle trap to outer elongated conductor or sheath contact for gas-insulated transmission lines. The particle trap to outer sheath contact of the invention is applicable to gas-insulated transmission lines having either corrugated or non-corrugated outer sheaths. The contact of the invention includes an electrical contact disposed on a lever arm which in turn is rotatably disposed on the particle trap and biased in a direction to maintain contact between the electrical contact and the outer sheath.

Fischer, William H. (Pittsburgh, PA); Cookson, Alan H. (Pittsburgh, PA); Yoon, Kue H. (Pittsburgh, PA)

1984-04-10T23:59:59.000Z

271

Electronically controllable transmission line design for traveling wave array antenna feed network  

E-Print Network [OSTI]

wave propagation in MIS waveguide. Krowne and Tait numerically analyzed a voltage-variable GaAs distributed Schottky barrier phase shifter and a transmission line over a Si bipolar junction [6]. In order to find the propagation constant, a transport... by attaching distributed p-i-n diodes on the side surfaces of the silicon rod. By introducing forward bias, which makes the i-region conductive, the guide wavelength in the silicon rod is changed because of the moving up effect of the conductor...

Shin, Chang-Seok

2012-06-07T23:59:59.000Z

272

EIS-0414: Presidential Permit Application, Energia Sierra Juarez Transmission Line, California  

Broader source: Energy.gov [DOE]

This EIS evaluates the potential environmental impacts from DOE’s proposed Federal action of granting a Presidential permit to Energia Sierra Juarez U.S. Tranmssion, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The County of San Diego is a cooperating agency in the preparation of this EIS.

273

EIS-0141: Washington Water Power/B.C. Hydro Transmission Interconnection Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy developed this statement to evaluate the environmental impacts of constructing and operating a double-circuit 230-kilovolt electrical transmission line that would link the electrical systems of the Washington Water Power Company and the British Columbia Hydro and Power Authority.

274

EIS-0496: San Luis Transmission Project, Alameda, Merced, San Joaquin and Stanislaus Counties, California  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration, with the Bureau of Reclamation as a cooperating agency, is preparing a joint EIS and environmental impact report (under the California Environmental Quality Act) to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western’s Central Valley Project Transmission System.

275

Overhead electric power transmission line jumpering system for bundles of five or more subconductors  

DOE Patents [OSTI]

Jumpering of electric power transmission lines at a dead end tower. Two transmission line conductor bundles each contain five or more spaced apart subconductors (5) arranged in the shape of a cylinder having a circular cross section. The ends of each bundle of subconductors are attached with insulators to a dead end tower (1). Jumpering allows the electric current to flow between the two bundles of subconductors using jumper buses, internal jumper conductors, and external jumper conductors. One or more current collecting jumper buses (37) are located inside each bundle of subconductors with each jumper bus being attached to the end of a subconductor. Small-diameter internal jumper conductors (33) are located in the inherently electrically shielded area inside each bundle of subconductors with each subconductor (except ones having an attached jumper bus) having one internal jumper conductor connected between that subconductor's end and a jumper bus. Large-diameter external jumper conductors (9) are located outside each bundle of subconductors with one or more external jumper conductors being connected between the jumper buses in one bundle of subconductors and the jumper buses in the other bundle.

Winkelman, Paul F. (Beaverton, OR)

1982-01-01T23:59:59.000Z

276

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date:CharterDepartmentDOE LM ) SCT&E LNG, LLC8

277

Discrete-Time Block Models for Transmission Line Channels: Static and Doubly Selective Cases  

E-Print Network [OSTI]

Most methodologies for modeling Transmission Line (TL) based channels define the input-output relationship in the frequency domain (FD) and handle the TL resorting to a two-port network (2PN) formalism. These techniques have not yet been formally mapped into a discrete-time (DT) block model, which is useful to simulate and estimate the channel response as well as to design optimal precoding strategies. TL methods also fall short when they are applied to Time Varying (TV) systems, such as the power line channel. The objective of this paper is to establish if and how one can introduce a DT block model for the Power Line Channel. We prove that it is possible to use Lifting and Trailing Zeros (L&TZ) techniques to derive a DT block model that maps the TL-based input-output description directly in the time domain (TD) block channel model. More specifically, we find an interesting relationship between the elements of an ABCD matrix, defined in the FD, and filtering kernels that allow an elegant representation of...

Galli, Stefano

2011-01-01T23:59:59.000Z

278

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect (OSTI)

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

279

Transmission  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of EnergyThe EnergyDepartment7 thFuel Processor for Transmission ,...

280

Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

The report presents transmission cost allocation methodologies for reliability transmission projects, generation interconnection, and economic transmission projects for all Regional Transmission Organizations.

Fink, S.; Porter, K.; Mudd, C.; Rogers, J.

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Investigation of a high impedance magnetically insulated transmission line oscillator with hollow load  

SciTech Connect (OSTI)

A novel high-impedance magnetically insulated transmission line oscillator (MILO) with greatly restrained power deposition on the anode has been investigated. Methods to increase the MILO impedance and decrease the anode current are discussed. A MILO with impedance of 30 {Omega} and power conversion efficiency of 25% is presented by particle-in-cell simulations. Compared with the previous MILO in our lab, the anode current of the proposed MILO is reduced about 50%, the power conversion efficiency doubles, and the power deposition on anode is reduced nearly one half. Furthermore, considerations for reducing the power deposition on load have also been carried out in MILO design, and the load current is reduced to 4.6 kA, only 17% of the total anode current. Finally, a hollow load was introduced to reduce the power deposition density on the load, without decreasing the power conversion efficiency.

Zhou Heng; Shu Ting; Li Zhiqiang [College of Opto-electric Science and Engineering, National University of Defense Technology, Hunan 410073 (China)

2012-09-15T23:59:59.000Z

282

Vertically aligned gas-insulated transmission line having particle traps at the inner conductor  

DOE Patents [OSTI]

Gas insulated electrical apparatus having first and second conductors separated by an insulating support within an insulating gas environment, and particle traps disposed along the surface of the high potential conductor for trapping and inactivating foreign particles which may be present within the insulating gas medium. Several embodiments of the invention were developed which are particularly suited for vertically aligned gas insulated transmission lines. The particle traps are grooves or cavities formed into the walls of the tubular inner conductor, without extending into the hollow portion of the conductor. In other embodiments, the traps are appendages or insert flanges extending from the inner conductor, with the insulator supports contacting the appendages instead of the inner conductor.

Dale, Steinar J. (Monroeville, PA)

1984-01-01T23:59:59.000Z

283

Theoretical and experimental investigation of axial power extraction from a magnetically insulated transmission line oscillator  

SciTech Connect (OSTI)

The utility of the magnetically insulated transmission line oscillator (MILO) as a high power microwave source depends on how efficiently power can be extracted from it. We have designed a slow-wave stepped transformer for the purpose of axially extracting microwave power from a 3.6 GHz coaxial MILO. The slow-wave transformer design was optimized using particle-in-cell simulation, and tested in experiments performed on the HPM Simulation Division's GEMINI and GYPSY water Blumlein pulse power sources. In this paper we summarize the slow-wave stepped transformer design, and describe MILO axial power extraction experiments which yielded up to 300 MW of radiated power. 10 refs., 4 figs., 2 tabs.

Lemke, R.W.; DeMuth, G.E.; Biggs, A.W. (Sandia National Labs., Albuquerque, NM (USA); Air Force Weapons Lab., Kirtland AFB, NM (USA); Alabama Univ., Huntsville, AL (USA). Dept. of Electrical and Computer Engineering)

1989-01-01T23:59:59.000Z

284

Semi-flexible gas-insulated transmission line using electric field stress shields  

DOE Patents [OSTI]

A gas-insulated transmission line includes an outer sheath, an inner conductor, an insulating gas electrically insulating the inner conductor from the outer sheath, and insulating supports insulatably supporting the inner conductor within the outer sheath. The inner conductor is provided with flexibility by use of main conductor sections which are joined together through a conductor hub section and flexible flexing elements. Stress shields are provided to control the electric field at the locations of the conductor hub sections where the insulating supports are contacting the inner conductor. The flexing elements and the stress shields may also be utilized in connection with a plug and socket arrangement for providing electrical connection between main conductor sections. 10 figs.

Cookson, A.H.; Dale, S.J.; Bolin, P.C.

1982-12-28T23:59:59.000Z

285

Semi-flexible gas-insulated transmission line using sandwiched discs for intermittent flexing joints  

DOE Patents [OSTI]

A gas-insulated transmission line includes an outer sheath, an inner conductor, an insulating gas electrically insulating the inner conductor from the outer sheath, and insulating supports insulatably supporting the inner conductor within the outer sheath. The inner conductor is provided with flexibility by the use of main conductor sections which are joined together through a conductor hub section and flexible flexing elements. Stress shields are provided to control the electric field at the locations of the conductor hub sections where the insulating supports are contacting the inner conductor. The flexing elements are formed by sandwiching together, by fusing, a pair of thin hollow discs which are fixedly secured to both the main conductor sections and the conductor hub section. 4 figs.

Kommineni, P.R.

1983-02-15T23:59:59.000Z

286

Complex modes and new amplification regimes in periodic multi transmission lines interacting with an electron beam  

E-Print Network [OSTI]

We show the existence of a new regime of operation for travelling wave tubes (TWTs) composed of slow-wave periodic structures that support two or more electromagnetic modes, with at least two synchronized with an electron beam. The interaction between the slow-wave structure and an electron beam is quantified using a multi transmission line approach (MTL) and transfer matrix analysis leading to the identification of modes with complex Bloch wavenumber. In particular, we report a new operation condition for TWTs based on an electron beam synchronous to two modes exhibiting a degeneracy condition near a band edge in a MTL slow-wave periodic structure. We show a phenomenological change in the band structure of periodic TWT where we observe at least two growing modal cooperating solutions as opposed to a uniform MTL interacting with an electron beam where there is strictly only one growing mode solution.

Othman, Mohamed; Capolino, Filippo

2014-01-01T23:59:59.000Z

287

Extension of Pierce model to multiple transmission lines interacting with an electron beam  

E-Print Network [OSTI]

A possible route towards achieving high power microwave devices is through the use of novel slow-wave structures employing multiple coupled transmission lines (MTLs) whose behavior when coupled to electron beams have not been sufficiently explored. We present the extension of the one-dimensional linearized Pierce theory to MTLs coupled to a single electron beam. We develop multiple formalisms to calculate the k-{\\omega} dispersion relation of the system and find that the existence of a growing wave solution is always guaranteed if the electron propagation constant is larger than or equal to the largest propagation constant of the MTL system. We verify our findings with illustrative examples which bring to light unique properties of the system in which growing waves were found to exist within finite bands of the electron propagation constant and discuss possible approach to improve the gain. By treating the beam-MTL interaction as distributed dependent current generators in the MTL, we derive relations charact...

Tamma, Venkata Ananth

2013-01-01T23:59:59.000Z

288

EIS-0091: Garrison-Spokane 500-kV Transmission Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

289

The effect of transmission-line corridor edge and successional stage on the animal community. Final report  

SciTech Connect (OSTI)

Using breeding success as a criterion of habitat quality, this report evaluates the suitability of 2 transmission-line corridor habitat types, grassland and shrubland, for open-nesting passerines in western Maryland. The main objectives were to investigate the patterns of fledging success and spatial distribution of nests in each habitat type in relation to the corridor, corridor-forest edge, and the adjacent forest, and to quantify important features of the microhabitat of corridor and forest nests that may influence nest success. The second part of this report examines the effect of a transmission-line corridor on forest animal communities by monitoring their activity patterns in the corridor. Animal activity patterns are compared between a transmission-line corridor that was maintained in shrubby vegetation by selective spraying of herbicides and one that was managed for herbaceous vegetation by mowing with rotary mowers.

Gates, D.J.E.

1982-01-01T23:59:59.000Z

290

EIS-0164: Pacific Gas Transmission/Pacific Gas and Electric and Altamont Natural Gas Pipeline Project  

Broader source: Energy.gov [DOE]

The Federal Energy Regulatory Commission (FERC) has prepared the PGT/PG&E and Altamont Natural Gas Pipeline Projects Environmental Impact Statement to satisfy the requirements of the National Environmental Policy Act. This project addresses the need to expand the capacity of the pipeline transmission system to better transfer Canadian natural gas to Southern California and the Pacific Northwest. The U.S. Department of Energy cooperated in the preparation of this statement because Section 19(c) of the Natural Gas Act applies to the Department’s action of authorizing import/export of natural gas, and adopted this statement by the spring of 1992. "

291

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

292

Achieving Near Zero SSN Power Delivery Networks by Eliminating Power Planes and Using Constant Current Power Transmission Lines  

E-Print Network [OSTI]

of discontinuities such as a power plane split or multiple via holes. Even with a solid return current pathAchieving Near Zero SSN Power Delivery Networks by Eliminating Power Planes and Using Constant Current Power Transmission Lines Suzanne Huh, Daehyun Chung, and Madhavan Swaminathan Interconnect

Swaminathan, Madhavan

293

Direct optoelectronic generation and detection of sub-ps-electrical pulses on sub-mm-coaxial transmission lines  

E-Print Network [OSTI]

Direct optoelectronic generation and detection of sub-ps-electrical pulses on sub efficient direct optoelectronic generation of sub-ps-THz pulses on 50 coaxial transmission lines with a 330 with an optoelectronic antenna having sub-ps-time resolution. We observed low-loss, single transverse electromagnetic

294

EA-1629: Herbicide Application within Transmission Line Rights-of-Way in the Ozark-St. Francis National Forest, Arkansas  

Broader source: Energy.gov [DOE]

The Department of the Interior, U.S. Forest Service, with DOE’s Southwestern Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of applying herbicide within transmission line rights-of-way in the Ozark-St. Francis National Forest in Arkansas. NOTE: SWPA's involvement in this EA has ended.

295

Comment on ``Return stroke transmission line model for stroke speed near and equal that of light'' by R. Thottappillil, J. Schoene,  

E-Print Network [OSTI]

Comment on ``Return stroke transmission line model for stroke speed near and equal that of light computed using the transmission line (TL) and antenna theory (AT) return-stroke models for a typical subsequent stroke current at the channel base and a return-stroke speed equal to the speed of light (v = c

Florida, University of

296

Transmission Lines, Reflections, and Termination Zo1 Supplementary material to accompany Digital Design Principles and Practices, Fourth Edition, by John F. Wakerly.  

E-Print Network [OSTI]

Transmission Lines, Reflections, and Termination Zo­1 Supplementary material to accompany Digital Design Principles and Practices, Fourth Edition, by John F. Wakerly. ISBN 0-13-186389-4. 2006 Pearson means, without permission in writing by the publisher. Zo: Transmission Lines, Reflections

Greenwood, Garrison W.

297

EIS-0478: Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billings, Williams, McKenzie, and Mountrail Counties, North Dakota  

Broader source: Energy.gov [DOE]

USDA Rural Utilities Service prepared an EIS that evaluates the potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE’s Western Area Power Administration, a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to Western’s transmission system.

298

Design and fault analysis of a 345KV 220 mile overhead transmission line.  

E-Print Network [OSTI]

??Efficient and reliable transmission of bulk power economically benefits both the power company and consumer. This report gives clarification to concept and procedure in design… (more)

Clawson, Greg

2012-01-01T23:59:59.000Z

299

Recyclable transmission line concept for z-pinch driven inertial fusion energy.  

SciTech Connect (OSTI)

Recyclable transmission lines (RTL)s are being studied as a means to repetitively drive z pinches to generate fusion energy. We have shown previously that the RTL mass can be quite modest. Minimizing the RTL mass reduces recycling costs and the impulse delivered to the first wall of a fusion chamber. Despite this reduction in mass, a few seconds will be needed to reload an RTL after each subsequent shot. This is in comparison to other inertial fusion approaches that expect to fire up to ten capsules per second. Thus a larger fusion yield is needed to compensate for the slower repetition rate in a z-pinch driven fusion reactor. We present preliminary designs of z-pinch driven fusion capsules that provide an adequate yield of 1-4 GJ. We also present numerical simulations of the effect of these fairly large fusion yields on the RTL and the first wall of the reactor chamber. These simulations were performed with and without a neutron absorbing blanket surrounding the fusion explosion. We find that the RTL will be fully vaporized out to a radius of about 3 meters assuming normal incidence. However, at large enough radius the RTL will remain in either the liquid or solid state and this portion of the RTL could fragment and become shrapnel. We show that a dynamic fragmentation theory can be used to estimate the size of these fragmented particles. We discuss how proper design of the RTL can allow this shrapnel to be directed away from the sensitive mechanical parts of the reactor chamber.

De Groot, J. S. (University of California, Davis, CA); Olson, Craig Lee; Cochrane, Kyle Robert (Ktech Corporation, Albuquerque, NM); Slutz, Stephen A.; Vesey, Roger Alan; Peterson, Per F. (University of California, Berkeley, CA)

2003-12-01T23:59:59.000Z

300

Semi-flexible gas-insulated transmission line using protection tube in conductor plug-in joint  

DOE Patents [OSTI]

A gas-insulated transmission line includes an outer sheath, an inner conductor, an insulating gas electrically insulating the inner conductor from the outer sheath, and insulating supports insulatably supporting the inner conductor within the outer sheath. The inner conductor is provided with flexibility by main conductor sections which are joined together through a conductor hub section and flexible flexing elements. Stress shields are provided to control the electric field at the locations of the conductor hub sections where the insulating supports are contacting the inner conductor. A plug and socket arrangement is utilized for joining adjacent sections of the inner conductor, and a protection tube is utilized inside the hollow plug to maintain proper alignment of the joint when the transmission line is bent. 3 figs.

Kommineni, P.R.

1983-01-25T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A conjugate Rosen's gradient projection method with global line search for piecewise linear optimization  

E-Print Network [OSTI]

A conjugate Rosen's gradient projection method with global line search for piecewise linear cutting plane method, simplex method, Rosen's gradient projection, conjugate gradient. 1 Introduction the zig-zagging of the gradient projection, we propose a conjugate gradient version of the face simplex

Beltran-Royo, Cesar

302

Particle trap to sheath non-binding contact for a gas-insulated transmission line having a corrugated outer conductor  

DOE Patents [OSTI]

A non-binding particle trap to outer sheath contact for use in gas insulated transmission lines having a corrugated outer conductor. The non-binding feature of the contact according to the teachings of the invention is accomplished by having a lever arm rotatably attached to a particle trap by a pivot support axis disposed parallel to the direction of travel of the inner conductor/insulator/particle trap assembly.

Fischer, William H. (Pittsburgh, PA)

1984-04-24T23:59:59.000Z

303

EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana , Hettinger, North Dakota , and New Underwood , South Dakota , in Custer and Fallon Counties in Montana, Adams , Bowman , and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

304

Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.  

SciTech Connect (OSTI)

Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

Lee, Jack M.

1992-06-01T23:59:59.000Z

305

EIS-0152: Iroquois, Tenn. Phase I, Pipeline Line Project  

Broader source: Energy.gov [DOE]

The Federal Energy Regulatory Commission prepared this statement to asses the environmental impacts of constructing and operating an interstate natural gas pipeline and associated infrastructure to transport gas from Canada and domestic sources to the New England Market, as proposed by the Iroquois Gas Transmission System and the Tennessee Gas Pipeline Company. The U.S. Department of Energy Office of Fossil Energy was a cooperating agency during statement development and adopted the statement on 9/1/1990.

306

California Energy Commission Public Interest EnergyResearch/Energy System Integration -- Transmission-Planning Research&Development Scoping Project  

SciTech Connect (OSTI)

The objective of this Public Interest Energy Research (PIER)scoping project is to identify options for public-interest research and development (R&D) to improve transmission-planning tools, techniques, and methods. The information presented was gathered through a review of current California utility, California Independent System Operator (ISO), and related western states electricity transmission-planning activities and emerging needs. This report presents the project teams findings organized under six topic areas and identifies 17 distinct R&D activities to improve transmission-planning in California and the West. The findings in this report are intended for use, along with other materials, by PIER staff, to facilitate discussions with stakeholders that will ultimately lead to development of a portfolio of transmission-planning R&D activities for the PIER program.

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-07-01T23:59:59.000Z

307

A Representation of Projective Space by the Points of a Line  

E-Print Network [OSTI]

fG fW. 1911 (Mathematics) Representation of project ive space by the points o JL i-ii^5 • A REPRESENTATION OF PROJECTIVE SPACE BY THE POINTS OF A LINE. GEORGE TOLLMAN "BESS. A thesis submitted in partial fulfilment of the requirements...-to-one recipro- cal correspondence with the elements of another planar pencil, which may be either a pencil of points on the same line 1 or on a line distinct from 1 or a pencil of planar lines [l 1!. EJLfiSfif 'EfiCiSfifiaiixaiifia. If IF*] and [O1...

Hess, George Wellman

1911-05-01T23:59:59.000Z

308

Development of NS-TACSR with extremely suppressed aeolian noise and its application to 500 kV overhead transmission lines  

SciTech Connect (OSTI)

Recently in Japan, with the unprecedented advance of residential area development in the suburbs of large cities, it has become quite difficult to secure the routes of EHV transmission lines from nuclear power plants in remote places to the suburbs of large cities, urging resolution of environmental problems related to transmission lines. In Japan, aerodynamic sound produced by conductors and insulators frequently caused noise problems. Having an opportunity of constructing a 500 kV transmission line through a residential are, we made a research to resolve this noise problem. This paper describes the characteristics of aeolian noise and preventive measures against it.

Tsujimoto, K.; Furukawa, S. (Kansai Electric Power Co., Inc., Osaka (Japan)); Shimojima, K.; Yamamoto, K. (Hitachi Cable, Ltd., Hitachi (JP))

1991-10-01T23:59:59.000Z

309

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects  

SciTech Connect (OSTI)

Preliminary Analysis of Grande Ronde Basalt Formation Flow Top Transmissivity as it Relates to Assessment and Site Selection Applications for Fluid/Energy Storage and Sequestration Projects

Spane, Frank A.

2013-04-29T23:59:59.000Z

310

Medium Voltage Overhead Power-line Broadband Communications; Transmission Capacity and Electromagnetic Interference  

E-Print Network [OSTI]

and Electromagnetic Interference P. Amirshahi and M. Kavehrad (FIEEE) The Pennsylvania State University, Department distribution networks for broadband power-line communications applications. Electromagnetic interference

Kavehrad, Mohsen

311

Abstract -In this paper, new formulations for the energy dissipation of lossy transmission lines driven by CMOS inverters are provided, and a new performance metric for the energy optimization under the delay  

E-Print Network [OSTI]

Abstract - In this paper, new formulations for the energy dissipation of lossy transmission lines for the driving-point impedance of lossy coupled transmission lines which itself is derived by solving Telegra stable circuits that are capable of modeling the transmission line for a broad range of frequencies

Pedram, Massoud

312

EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004)  

Broader source: Energy.gov [DOE]

A U.S. Department of Energy (DOE) Presidential permit is required to construct an electric transmission line across the U.S. international border. On February 27, 2001, Baja California Power, Inc. ...

313

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

Michael Lane

314

Towards Software Product Lines Application in the Context of a Smart Building Project  

E-Print Network [OSTI]

Towards Software Product Lines Application in the Context of a Smart Building Project Thibaut. This paper presents proposals on how to apply software prod- uct lines in the context of smart buildings the various components involved in smart buildings, and to capitalize on the devel- oped IT components

Paris-Sud XI, Université de

315

EIS-0032: 500 kV International Transmission Line NSP-TR-1, Forbes, Minnesota to Manitoba, Canada, Northern States Power Company  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration developed this EIS to evaluate the environmental impacts of a 500-kilovolt transmission line proposed by the Northern States Power Company to provide a transmission facility for the exchange of electrical energy between Canada and the United States.

316

Abstract -In this paper, new formulations for the energy dissipation of lossy transmission lines driven by CMOS inverters are provided. These  

E-Print Network [OSTI]

inverter inputs. To accomplish this task, a new stable circuit that is capable of modeling the transmission enabling a host of new and powerful applications. Recent studies on the effects caused by the nanometerAbstract - In this paper, new formulations for the energy dissipation of lossy transmission lines

Heydari, Payam

317

EIS-0100: Liberty-Coolidge 230-kV Transmission Line, Arizona  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with an upgrade of electrical transmission capability between the Liberty and Coolidge Substations.

318

EIS-0129: New England/Hydro-Quebec 450 kV Transmission Line Interconnection- Phase II  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration issued this EIS to explore the impacts of amending Presidential Permit PP-76 to allow the Vermont Electrical Company to operate at power levels above those stipulated in the permit and to build additional transmission facilities to distribute the increased power.

319

Flexible Transmission in the Smart Grid  

E-Print Network [OSTI]

Planning . 102 vi Transmission Line Maintenance Scheduling 103 Just-in-time Transmission 103 Flexible Transmission in the Smart Grid

Hedman, Kory Walter

2010-01-01T23:59:59.000Z

320

2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles  

E-Print Network [OSTI]

2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles Prof. Victor C become significant, especially in electric vehicles (EVs) of the future, which are highly sophisticated.M. Leung (vleung@ece.ubc.ca) 1. Project description In today's electric and conventional combustion engine

Leung, Victor C.M.

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Influence of the airflow speed along transmission lines on the DC corona discharge loss, using finite element approach  

SciTech Connect (OSTI)

Corona discharge is of great interest from the physical point of view and due to its numerous practical applications in industry and especially one of the most important sources of loss in the high voltage transmission lines. This paper provides guidelines for the amount of electric loss caused by corona phenomenon occurred around a DC high voltage wire placed between two flat plates and influence of wind speed rate on the amount of corona loss using COMSOL Multiphysics. So electric potential distribution patterns and charge density diffusion around the wire are studied in this article.

Shemshadi, A.; Akbari, A. [Electric Department, K. N. Toosi University of Technology, Tehran (Iran, Islamic Republic of); Niayesh, K. [Electric Engineering Department, Tehran University, Tehran (Iran, Islamic Republic of)

2012-07-15T23:59:59.000Z

322

EIS-0159: Flatiron-Erie 115-kV Transmission Line  

Broader source: Energy.gov [DOE]

"The Western Area Power Administration proposes to build 27 new wood H-frame structures along the line, to replace or modify 45 of the existing structures and to remove 11 of them."

323

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmen...  

Broader source: Energy.gov (indexed) [DOE]

document request line: 800-622-4520. It is also available at the BPA, Environment, Fish & Wildlife website: www.efw.bpa.gov. For Further Information, Contact: Dawn R. Boorse -...

324

Pauli graph and finite projective lines/geometries  

E-Print Network [OSTI]

The commutation relations between the generalized Pauli operators of N-qudits (i. e., N p-level quantum systems), and the structure of their maximal sets of commuting bases, follow a nice graph theoretical/geometrical pattern. One may identify vertices/points with the operators so that edges/lines join commuting pairs of them to form the so-called Pauli graph P_{p^N} . As per two-qubits (p = 2, N = 2) all basic properties and partitionings of this graph are embodied in the geometry of the symplectic generalized quadrangle of order two, W(2). The structure of the two-qutrit (p = 3, N = 2) graph is more involved; here it turns out more convenient to deal with its dual in order to see all the parallels with the two-qubit case and its surmised relation with the geometry of generalized quadrangle Q(4, 3), the dual of W(3). Finally, the generalized adjacency graph for multiple (N > 3) qubits/qutrits is shown to follow from symplectic polar spaces of order two/three. The relevance of these mathematical concepts to mutually unbiased bases and to quantum entanglement is also highlighted in some detail.

Michel R. P. Planat; Metod Saniga

2007-03-16T23:59:59.000Z

325

Wholesale Power and Transmission Rate Projections 1993--2014 and Historical Wholesale Power Rates 1939--1992.  

SciTech Connect (OSTI)

This document provides a range of high, medium, and low case long-term projections of Bonneville Power Administration`s (BPA) wholesale power rates and a medium case long-term projection of BPA`s wheeling rates. These projections are produced annually by BPA. BPA uses these projections in long-term marketing, resource, transmission, and financial planning assessments. BPA`s projections also are used by public utility commissions, utilities, and others for a variety of planning purposes. The analysis used for these rate projections assumes that current rate making methodologies continue into the future and are further based on certain assumptions about regional loads, extra-regional markets, the costs of resources, BPA`s financial requirements, and the capability of the region`s power plants. While these projections are intended to address the overall uncertainty in rate levels, BPA realizes that the future will not reflect any specific set of assumptions. The rate projections in this document have been prepared prior to the Draft 1993 BPA Marketing Plan, the implementation of which is almost certain to push BPA away from any set of assumptions in this document. Therefore, this document can be thought of as representing the ``old`` BPA with its products and policies. It can be viewed as a starting point or reference point to measure the impact of the ``new`` BPA with its Marketing Plan, and the broader undertaking referred to as the Competitiveness Project.

US Bonneville Power Administration

1993-11-01T23:59:59.000Z

326

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

SciTech Connect (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

327

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergy DOEDealingVehicle1: Draft6:Statement | Department ofEnergy 86:

328

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThis EISStatementUtah, andto ConductStatement |and Delaware |

329

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThis

330

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project,  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement | Department of333EnergyDOE isDepartment

331

Notice of Availability of Plains & Eastern Clean Line Transmission Project  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment of Energy Advanced FramingBoost |Draft Environmental Impact

332

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit ServicesMirant PotomacFinal Environmental AssessmentTuscarora,6

333

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton,  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit ServicesMirant PotomacFinal1935: Final EnvironmentalBatavia,946:Marion, and

334

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County,  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit ServicesMirant PotomacFinal1935: FinalDraft

335

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit ServicesMirant PotomacFinal1935: FinalDraftDraftB Minnesota PowerPolson,

336

Request for Proposals for New or Upgraded Transmission Line Projects Under  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research |Regulation Services System:Affairs, toDepartmentEnergySecurity

337

Project W-314 sn-630 transfer line az-02a to an-b acceptance for beneficial use  

SciTech Connect (OSTI)

Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

Warnick, T.L., Westinghouse Hanford, Richland, WA

1997-09-29T23:59:59.000Z

338

Project W-314 sn-634 transfer line a-b to ax-b acceptance for beneficial use  

SciTech Connect (OSTI)

Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

Warnick, T.L., Westinghouse Hanford, Richland, WA

1997-09-29T23:59:59.000Z

339

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocsCenterCenter (LMI-EFRC) -PrinciplesLeeLinda

340

NWCC Transmission Case Study III  

SciTech Connect (OSTI)

OAK-B135 Transmission System Improvements for Wind Energy Development in the Upper Midwest and Great Plains: Opportunities and Obstacles. This case study set out to ascertain the validity of three assumptions from the perspectives of stakeholders involved in wind energy and transmission issues in the Upper Midwest and Great Plains. The assumptions, and the stakeholders' reactions to each, are summarized below: Assumption 1--Transmission system improvements would provide significant benefits to the electricity network and its customers. Respondents acknowledge the potential for overall system benefits in the form of reduced line losses, improved grid stability and reliability, and enhanced ability to conduct spot market transactions. They also agree that these benefits relate to specific regional needs. However, there is disagreement over the extent of other benefits such as efficiency gains and cost savings from reduced line losses. Further, environmental and community interest groups point out that none of these benefits are realized without significant financial, environmental and social costs. Assumption 2--The benefits of transmission improvements would be helpful, but not confined, to wind power. All respondents agree that wind energy could benefit from transmission system improvements. But they also acknowledge, reluctantly, in the case of environmental stakeholders, that the benefits of an improved transmission system cannot be limited to environmentally preferable forms of generation. Some environmental and community advocate respondents also feel that transmission system improvement projects can be avoided altogether through energy conservation and efficiency measures, and by substituting wind energy for fossil generation. Assumption 3--Transmission alliances among stakeholders within and external to the wind community can provide benefits in the public interest. The fractured, multi-jurisdictional governance of the regional transmission system, and the distrust and diversity of perspectives among affected stakeholders, may make the formation of multi-stakeholder alliances necessary to accomplishing transmission goals. If the wind industry and utilities want to partner with environmental and community advocate groups in supporting a transmission project, they may have to convince these groups that the project would result in a net environmental benefit. The project proponents would have to make the case that the benefits of the additional wind energy will at least offset the emissions of any additional fossil generation made possible by the transmission project, as well as offset the environmental impact of the transmission project itself.

Terry Allison, Steve Wiese

2000-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley  

E-Print Network [OSTI]

?unintentional?vandalism,?and?normal?irrigation?district?operational?and?maintenance? activities.??Each?project?was?evaluated?using?a?visual?inspection?process?during?which? performance/condition?ratings?were?assigned.? ? Without?question,?the?best?lining?system?is?a?synthetic?liner?with?a?protective?barrier?of? shotcrete.??The?synthetic?liner?significantly?reduces?seepage,?while?the?shotcrete?protects...?it? from?damage.??This?lining?system?needs?little?to?no?maintenance.??There?were?two?types?of? liners?used:?PVC?and?polyester.??Each?performed?equally?as?well.? ? The?performance?of?synthetic?liners?without?a?protective...

Karimov, Askar; Leigh, Eric; Fipps, Guy

342

EA-1863: Vegetation Management on the Glen Canyon-Pinnacle Peak Transmission Lines Spanning the Coconino National Forest, Coconino County, Arizona  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of updating the vegetation management and right-of-way maintenance program for Western’s Glen Canyon to Pinnacle Peak 345-kV transmission lines, which cross the Coconino National Forest, Coconino County, Arizona.

343

EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

344

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah  

Broader source: Energy.gov [DOE]

This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

345

u.s. DEPARTl'..IENT OF ENERGY EERE PROJECT MANAGEM ENT CEN T  

Broader source: Energy.gov (indexed) [DOE]

No.1 to conduct preliminary engineering analyses in support of a project to harness hydroelectric power from the Everett, WA Reservoir 4 water transmission line. The Snohomish...

346

Validation of phasor calculations in the Macrodyne PMU for California-Oregon Transmission Project tests of March 1993  

SciTech Connect (OSTI)

Faults applied during March 1993 commissioning tests for the California-Oregon Transmission Project produced 14 Hz transient oscillations that were conspicuous in BPA`s enhanced transducers at Malin, and in PG and E`s Dynamic System Monitor at Table Mountain. Prony analysis of high speed fault data provided a detailed model for the underlying network resonance signal, and a basis for validating transient performance of a Macrodyne Phasor Measurement Unit (PMU) at the test site. This instrument, which is closely associated with EPRI`s FACTS project, provides useful insight into emerging technology for high speed digital transducers. The phasor calculations are found to be of very high quality, but filtering enhancements are recommended for broadband applications.

Hauer, J.F. [Pacific Northwest Labs., Richland, WA (United States)] [Pacific Northwest Labs., Richland, WA (United States)

1996-07-01T23:59:59.000Z

347

EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high- voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

348

Transmission Cost Allocation Methodologies for Regional Transmission Organizations  

SciTech Connect (OSTI)

This report describes transmission cost allocation methodologies for transmission projects developed to maintain or enhance reliability, to interconnect new generators, or to access new resources and enhance competitive bulk power markets, otherwise known as economic transmission projects.

Fink, S.; Rogers, J.; Porter, K.

2010-07-01T23:59:59.000Z

349

COE projection for the modular WARP{trademark} wind power system for wind farms and electric utility power transmission  

SciTech Connect (OSTI)

Wind power has emerged as an attractive alternative source of electricity for utilities. Turbine operating experience from wind farms has provided corroborating data of wind power potential for electric utility application. Now, a patented modular wind power technology, the Toroidal Accelerator Rotor Platform (TARP{trademark}) Windframe{trademark}, forms the basis for next generation megawatt scale wind farm and/or distributed wind power plants. When arranged in tall vertically clustered TARP{trademark} module stacks, such power plant units are designated Wind Amplified Rotor Platform (WARP{trademark}) Systems. While heavily building on proven technology, these systems are projected to surpass current technology windmills in terms of performance, user-friendly operation and ease of maintenance. In its unique generation and transmission configuration, the WARP{trademark}-GT System combines both electricity generation through wind energy conversion and electric power transmission. Furthermore, environmental benefits include dramatically less land requirement, architectural appearance, lower noise and EMI/TV interference, and virtual elimination of bird mortality potential. Cost-of-energy (COE) is projected to be from under $0.02/kWh to less than $0.05/kWh in good to moderate wind resource sites.

Weisbrich, A.L. [ENECO, West Simsbury, CT (United States); Ostrow, S.L.; Padalino, J. [Raytheon Engineers and Constructors, New York, NY (United States)

1995-09-01T23:59:59.000Z

350

File:08-CA-d - CPCN for Transmission Projects (2).pdf | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdf Jump to: navigation, search FileTransmissionOverview.pdfInformation d

351

EIS-0267: BPA/Lower Valley Transmission System Reinforcement Project, Wyoming  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA and LVPL proposal to construct a new 115-kV line from BPA’s Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA’s Teton Substation near Jackson in Teton County, Wyoming.

352

Author's Copy: J.B. Bancroft, A. Morrison, G. Lachapelle, Validation of GNSS under 500,000 V Direct Current (DC) transmission lines, Computers and Electronics in Agriculture, Volume 83, April 2012, Pages 58-67, ISSN 0168-1699, 10.1016/j.compag.2012.01.013  

E-Print Network [OSTI]

masking by the towers. Tests were conducted under a set of three transmission lines, two 500 kV DC lines Current (DC) transmission lines, Computers and Electronics in Agriculture, Volume 83, April 2012, Pages 58 Validation of GNSS under 500,000 Volt Direct Current (DC) Transmission Lines J.B. Bancroft*, A. Morrison

Calgary, University of

353

Study on reduction in electric field, charged voltage, ion current and ion density under HVDC transmission lines by parallel shield wires  

SciTech Connect (OSTI)

An important problem in the design and operation of HVDC transmission lines is to reduce electrical field effects such as ion flow electrification of objects, electric field, ion current and ion density at ground level in the vicinity of HVDC lines. Several models of shield wire were tested with the Shiobara HVDC test line. The models contain typical stranded wires that are generally used to reduce field effects at ground level, neutral conductors placed at lower parts of the DC line, and an ''earth corona model'' to cancel positive or negative ions intentionally by generating ions having opposite polarity to ions flowing into the wire. This report describes the experimental results of the effects of these shield wires and a method to predict shielding effects.

Amano, Y.; Sunaga, Y.

1989-04-01T23:59:59.000Z

354

EA-2002: Right-of-Way Application for the Tucson-Apache 115-kV Transmission Line, Pima County, Arizona  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) and the Bureau of Indian Affairs (BIA), as joint lead agencies, are preparing an EA that will evaluate the potential environmental impacts of a proposal for BIA to grant Western a 150-foot right-of-way across tribal land along the existing Tucson-Apache Transmission Line to replace the previous 100-foot right-of-way, which has expired.

355

EA-1899: Rerouting and Renovating of Estes-Flatiron Three Transmission Lines to Double Circuit 115-kV, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration started to prepare an EA to evaluate the environmental impacts of a proposal to reroute and renovate the Estes-Flatiron Three Transmission Lines in Larimer County, Colorado. Based on comments received during the scoping period, Western ended preparation of DOE/EA-1899 and announced its intent to prepare and environmental impact statement, DOE/EIS-0483.

356

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Broader source: Energy.gov (indexed) [DOE]

Integration, Transmission, and Resource Assessment and Characterization Projects Wind Integration, Transmission, and Resource Assessment and Characterization Projects From 2006 to...

357

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21, 2015 7:00AM to 10:30AM EDT Tuition Cost:

358

Determination of High-Frequency Current Distribution Using EMTP-Based Transmission Line Models with Resulting Radiated Electromagnetic Fields  

SciTech Connect (OSTI)

Application of BPL technologies to existing overhead high-voltage power lines would benefit greatly from improved simulation tools capable of predicting performance - such as the electromagnetic fields radiated from such lines. Existing EMTP-based frequency-dependent line models are attractive since their parameters are derived from physical design dimensions which are easily obtained. However, to calculate the radiated electromagnetic fields, detailed current distributions need to be determined. This paper presents a method of using EMTP line models to determine the current distribution on the lines, as well as a technique for using these current distributions to determine the radiated electromagnetic fields.

Mork, B; Nelson, R; Kirkendall, B; Stenvig, N

2009-11-30T23:59:59.000Z

359

Market-based Investment in Electricity Transmission Networks: Controllable Flow  

E-Print Network [OSTI]

in new lines, rather than small-scale network upgrades. Whereas market-based transmission investment may mitigate the problem of under- investment, it is unlikely to suffice alone and thus regulated projects by the designated transmission system... aims at transmission of bulk power to be less than small-scale AC network deepening projects; even if these AC projetcs are small scale, they may be large compared to the size of their market. The DC-interconnector projects in the USA are typically...

Brunekreeft, Gert

2004-06-16T23:59:59.000Z

360

The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata  

SciTech Connect (OSTI)

The Genomes On Line Database (GOLD) is a comprehensive resource of information for genome and metagenome projects world-wide. GOLD provides access to complete and ongoing projects and their associated metadata through pre-computed lists and a search page. The database currently incorporates information for more than 2900 sequencing projects, of which 639 have been completed and the data deposited in the public databases. GOLD is constantly expanding to provide metadata information related to the project and the organism and is compliant with the Minimum Information about a Genome Sequence (MIGS) specifications.

Fenner, Marsha W; Liolios, Konstantinos; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Kyrpides, Nikos C.

2007-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata  

SciTech Connect (OSTI)

The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

2009-09-01T23:59:59.000Z

362

Analogue Hawking Radiation in a dc-SQUID Array Transmission Line P. D. Nation,1,* M. P. Blencowe,1  

E-Print Network [OSTI]

) where cs is the speed of sound and vðr� is the spatially varying velocity of the fluid. For a sound wave system was first sug- gested by Unruh who uncovered the analogy between sound waves in a fluid been proposed using Bose- Einstein condensates [4], liquid Helium [5], electromag- netic transmission

Buks, Eyal

363

EIS-0379- Rebuild of the Libby (FEC) to Troy Section of BPA’s 115-kilovolt Transmission Line in Libby, Lincoln County, Montana  

Broader source: Energy.gov [DOE]

This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA’s Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative’s (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA’s Troy Substation just east of the town of Troy, Montana.

364

Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii  

SciTech Connect (OSTI)

Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

1993-10-01T23:59:59.000Z

365

Heavy duty insulator assemblies for 500-kV bulk power transmission line with large diameter octagonalbundled conductor  

SciTech Connect (OSTI)

This paper describes the design procedure and the results of field tests on mechanical performances of insulator assemblies newly developed to support octagonal-bundled conductors for 500-kV bulk power transmission. Taking account of conductor-motion-induced peak tensile load, fatigue, torsional torque and others, a successful design has been achieved in two prototype assemblies for such heavy mechanical duties as encountered during conductor galloping or swing. This has been proved throughout three years of the field tests.

Tsujimoto, K.; Hayase, I.; Hirai, J.; Inove, M.; Naito, K.; Yukino, T.

1982-11-01T23:59:59.000Z

366

July 2, 2007 1 Optimal Transmission Switching  

E-Print Network [OSTI]

d to node n. zk: binary variable indicating whether transmission line k is removed from the system limit on number of open transmission lines Manuscript received July 2, 2007. This work was supported-mail: ferris@cs.wisc.edu). Sets : Set of all transmission lines L: Set of open transmission lines in solution

Mangasarian, Olvi L.

367

Dynamic valuation model For wind development in regard to land value, proximity to transmission lines, and capacity factor  

E-Print Network [OSTI]

Developing a wind farm involves many variables that can make or break the success of a potential wind farm project. Some variables such as wind data (capacity factor, wind rose, wind speed, etc.) are readily available in ...

Nikandrou, Paul

2009-01-01T23:59:59.000Z

368

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared0 ResourceAwardsSafeguards andSan Juan Montana Thrust Belt WYLuis

369

Transmission Commercial Project Integration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2Topo II: AnTraining andfordefault Sign In About |

370

Geothermal Resources and Transmission Planning  

Broader source: Energy.gov [DOE]

This project addresses transmission-related barriers to utility-scale deployment of geothermal electric generation technologies.

371

Development of a special nuclear materials monitoring sensor pack for Project Straight-Line  

SciTech Connect (OSTI)

With the end of the Cold War and the accelerated dismantlement of nuclear weapons, the nuclear material inventory of the United States is growing. In addition, the United States has offered these excess weapons-grade nuclear material assets for international inspections with the intent of encouraging reciprocal action by other nations. In support of this policy, Sandia National Laboratories has initiated a pilot effort (Project Straight-Line) to develop a flexible, site-independent system to continuously and remotely monitor stored nuclear material and integrate the collection, processing, and dissemination of information regarding this material to ensure that declared nuclear materials placed in storage remain in place, unaltered, and stable. As part of this effort, a +3.6V battery powered, modular sensor pack has been developed to monitor total radiation dose, radiation dose rate, and the temperature of each nuclear material container and to provide this information using a standardized sensor interface. This paper will discuss the development of the sensors, the engineering and production of the sensor pack units, and their installation and operation at sites in New Mexico, California, and the Pantex plant in Amarillo.

Daily, M.R.; Moreno, D.J.; Tolk, K.M.; Wilcoxen, J.L. [Sandia National Labs., Albuquerque, NM (United States); Oetken, R.E.; Collins, J.E.; Miller, R.; Olsen, R.W. [Sandia National Labs., Livermore, CA (United States); Sheets, L. [Allied-Signal, Kansas City, MO (United States). Kansas City Division

1995-12-31T23:59:59.000Z

372

EIS-0427: Grapevine Canyon Wind Project, Coconino County, Arizona  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental impacts of a proposed wind energy generation project in Coconino County, Arizona, on privately owned ranch lands and trust lands administered by the Arizona State Land Department. The proposed project includes a new transmission tie-line that would cross lands administered by Coconino National Forest and interconnect with DOE’s Western Area Power Administration’s existing Glen Canyon-Pinnacle Peak transmission lines.

373

FRN Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of EPAct 2005 - June 10, 2010  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit|Department ofof Energy Offers TrainingFaxFORGE

374

Transmission Dr. Sandra Cruz-Pol  

E-Print Network [OSTI]

Transmission Lines Dr. Sandra Cruz-Pol ECE Dept. UPRM Exercise 11.3 n A 40-m long TL has Vg=15 Vrms to electric circuits! cmc kmc GHz Hz 15000,000,2000/ 000,560/ 2 60 == == Transmission Lines I. TL parameters-wave transformer ¨ Slotted line ¨ Single stub VI. Microstrips Transmission Lines (TL) n TL have two conductors

Cruz-Pol, Sandra L.

375

EIS-0465: Pepco Holdings, Inc. Mid-Atlantic Power Path (MAPP) Project, Prince George's, Calvert, and Wicomico Counties, Maryland, and Sussex County, Delaware  

Broader source: Energy.gov [DOE]

Pepco Holdings, Inc., cancelled its proposed Phase II of the Mid-Atlantic Power Pathway transmission line project and DOE cancelled preparation of an EIS on the potential environmental impacts of a proposed federal loan guarantee for the project.

376

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian...  

Energy Savers [EERE]

Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands Transmission Interconnection Project Oahu Wind Integration and Transmission Study (OWITS): Hawaiian Islands...

377

Recyclable transmission line (RTL) and linear transformer driver (LTD) development for Z-pinch inertial fusion energy (Z-IFE) and high yield.  

SciTech Connect (OSTI)

Z-Pinch Inertial Fusion Energy (Z-IFE) complements and extends the single-shot z-pinch fusion program on Z to a repetitive, high-yield, power plant scenario that can be used for the production of electricity, transmutation of nuclear waste, and hydrogen production, all with no CO{sub 2} production and no long-lived radioactive nuclear waste. The Z-IFE concept uses a Linear Transformer Driver (LTD) accelerator, and a Recyclable Transmission Line (RTL) to connect the LTD driver to a high-yield fusion target inside a thick-liquid-wall power plant chamber. Results of RTL and LTD research are reported here, that include: (1) The key physics issues for RTLs involve the power flow at the high linear current densities that occur near the target (up to 5 MA/cm). These issues include surface heating, melting, ablation, plasma formation, electron flow, magnetic insulation, conductivity changes, magnetic field diffusion changes, possible ion flow, and RTL mass motion. These issues are studied theoretically, computationally (with the ALEGRA and LSP codes), and will work at 5 MA/cm or higher, with anode-cathode gaps as small as 2 mm. (2) An RTL misalignment sensitivity study has been performed using a 3D circuit model. Results show very small load current variations for significant RTL misalignments. (3) The key structural issues for RTLs involve optimizing the RTL strength (varying shape, ribs, etc.) while minimizing the RTL mass. Optimization studies show RTL mass reductions by factors of three or more. (4) Fabrication and pressure testing of Z-PoP (Proof-of-Principle) size RTLs are successfully reported here. (5) Modeling of the effect of initial RTL imperfections on the buckling pressure has been performed. Results show that the curved RTL offers a much greater buckling pressure as well as less sensitivity to imperfections than three other RTL designs. (6) Repetitive operation of a 0.5 MA, 100 kV, 100 ns, LTD cavity with gas purging between shots and automated operation is demonstrated at the SNL Z-IFE LTD laboratory with rep-rates up to 10.3 seconds between shots (this is essentially at the goal of 10 seconds for Z-IFE). (7) A single LTD switch at Tomsk was fired repetitively every 12 seconds for 36,000 shots with no failures. (8) Five 1.0 MA, 100 kV, 100 ns, LTD cavities have been combined into a voltage adder configuration with a test load to successfully study the system operation. (9) The combination of multiple LTD coaxial lines into a tri-plate transmission line is examined. The 3D Quicksilver code is used to study the electron flow losses produced near the magnetic nulls that occur where coax LTD lines are added together. (10) Circuit model codes are used to model the complete power flow circuit with an inductive isolator cavity. (11) LTD architectures are presented for drivers for Z-IFE and high yield. A 60 MA LTD driver and a 90 MA LTD driver are proposed. Present results from all of these power flow studies validate the whole LTD/RTL concept for single-shot ICF high yield, and for repetitive-shot IFE.

Sharpe, Robin Arthur; Kingsep, Alexander S. (Kurchatov Institute, Moscow, Russia); Smith, David Lewis; Olson, Craig Lee; Ottinger, Paul F. (Naval Research Laboratory, Washington, DC); Schumer, Joseph Wade (Naval Research Laboratory, Washington, DC); Welch, Dale Robert (Voss Scientific, Albuquerque, NM); Kim, Alexander (High Currents Institute, Tomsk, Russia); Kulcinski, Gerald L. (University of Wisconsin, Madison, WI); Kammer, Daniel C. (University of Wisconsin, Madison, WI); Rose, David Vincent (Voss Scientific, Albuquerque, NM); Nedoseev, Sergei L. (Kurchatov Institute, Moscow, Russia); Pointon, Timothy David; Smirnov, Valentin P. (Kurchatov Institute, Moscow, Russia); Turgeon, Matthew C.; Kalinin, Yuri G. (Kurchatov Institute, Moscow, Russia); Bruner, Nichelle "Nicki" (Voss Scientific, Albuquerque, NM); Barkey, Mark E. (University of Alabama, Tuscaloosa, AL); Guthrie, Michael (University of Wisconsin, Madison, WI); Thoma, Carsten (Voss Scientific, Albuquerque, NM); Genoni, Tom C. (Voss Scientific, Albuquerque, NM); Langston, William L.; Fowler, William E.; Mazarakis, Michael Gerrassimos

2007-01-01T23:59:59.000Z

378

Eastern Wind Integration and Transmission Study: Executive Summary...  

Office of Environmental Management (EM)

Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview Eastern Wind Integration and Transmission Study: Executive Summary and Project Overview This...

379

Role of pilot projects and public acceptance in developing wireless power transmission as an enabling technology for space solar power systems  

SciTech Connect (OSTI)

In all system concepts for delivering space solar power to terrestrial power systems, wireless power transmission (WPT) is identified as a critical link in the technology chain. To realize the full potential of WPT as an enabling technology for the development of space power systems, the technology needs to (1) be demonstrated as a commercially viable, low risk technology, and (2) be shown to be acceptable to the public. If WPT`s full potential is to be realized, its initial applications must be carefully chosen and demonstrated through a series of pilot projects which will develop both the technology and its public acceptance. This paper examines the role of pilot projects and how they will play an increasingly important role in the development and acceptance of WPT as an enabling technology for space solar power systems. Recognizing that public acceptance is the ultimate determinant of the commercial success or failure of a technology, the paper then explores the role of public opinion in the commercialization process of space solar power systems utilizing WPT. A framework that begins to define the process required to realize the full commercial potential of wireless power transmission is established. 21 refs., 1 fig., 2 tabs.

Woodell, M.I. [Bivings Woodell, Inc., Washington, DC (United States)] [Bivings Woodell, Inc., Washington, DC (United States); Schupp, B.W. [Raytheon Electronic Systems, Marlborough, MA (United States)] [Raytheon Electronic Systems, Marlborough, MA (United States)

1996-12-31T23:59:59.000Z

380

Lumped transmission line avalanche pulser  

DOE Patents [OSTI]

A lumped linear avalanche transistor pulse generator utilizes stacked transistors in parallel within a stage and couples a plurality of said stages, in series with increasing zener diode limited voltages per stage and decreasing balanced capacitance load per stage to yield a high voltage, high and constant current, very short pulse. 8 figs.

Booth, R.

1995-07-18T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Lumped transmission line avalanche pulser  

DOE Patents [OSTI]

A lumped linear avalanche transistor pulse generator utilizes stacked transistors in parallel within a stage and couples a plurality of said stages, in series with increasing zener diode limited voltages per stage and decreasing balanced capacitance load per stage to yield a high voltage, high and constant current, very short pulse.

Booth, Rex (Livermore, CA)

1995-01-01T23:59:59.000Z

382

EIS-0398: Delta-Mendota Canal/California Aqueduct Intertie (DCI) Project  

Broader source: Energy.gov [DOE]

This EIS analyzes WAPA's decision to authorize a new interconnection and design, construct, operate, and maintain a new 69-kilovolt transmission line as part of the Delta-Mendota Canal Intertie Project.

383

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

SciTech Connect (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

384

1346 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 23, NO. 3, AUGUST 2008 Optimal Transmission Switching  

E-Print Network [OSTI]

to node . Binary variable indicating whether transmission line is removed from the system (open susceptance of line . Large number. Upper limit on number of open transmission lines. Sets Set of all transmission lines. Set of open transmission lines in solution to transmission switching in which

Ferris, Michael C.

385

Wind Integration, Transmission, and Resource Assessment andCharacteri...  

Energy Savers [EERE]

& Publications Wind Integration, Transmission, and Resource Assessment and Characterization Projects Offshore Wind Projects Testing, Manufacturing, and Component Development...

386

Quantum LDPC Codes Constructed from Point-Line Subsets of the Finite Projective Plane  

E-Print Network [OSTI]

Due to their fast decoding algorithms, quantum generalizations of low-density parity check, or LDPC, codes have been investigated as a solution to the problem of decoherence in fragile quantum states. However, the additional twisted inner product requirements of quantum stabilizer codes force four-cycles and eliminate the possibility of randomly generated quantum LDPC codes. Moreover, the classes of quantum LDPC codes discovered thus far generally have unknown or small minimum distance, or a fixed rate. This paper presents several new classes of quantum LDPC codes constructed from finite projective planes. These codes have rates that increase with the block length $n$ and minimum weights proportional to $n^{1/2}$.

Jacob Farinholt

2012-07-03T23:59:59.000Z

387

EIS-0418: PrairieWinds Project, South Dakota  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to approve the interconnection request from PrairieWinds for their South Dakota PrairieWinds Project, a 151.5-megawatt (MW) nameplate capacity wind powered generation facility, including 101 General Electric 1.5-MW wind turbine generators, electrical collector lines, collector substation, transmission line, communications system, and wind turbine service access roads.

388

Hybrid Transmission Corridor study  

SciTech Connect (OSTI)

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

389

Environmental Assessment : Happy Valley [Substation Project].  

SciTech Connect (OSTI)

The proposed Happy Valley project consists of construction of a new BPA customer service 69-kV substation south of Sequim in Clallam County, Washington. A tie line, to be constructed by the customer as part of this project, will link the new BPA facility to the existing customer's transmission system in the area. This project responds to rapid load growth in the Olympic Peninsula, and will strengthen the existing BPA system and interconnected utility systems. It will reduce transmission losses presently incurred, especially on the BPA system supplying power to the Olympic Peninsula. This report describes the potential environmental impact of the proposed actions. 2 figs., 1 tab.

United States. Bonneville Power Administration.

1982-05-01T23:59:59.000Z

390

Griffith Energy Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

N /A

1999-04-02T23:59:59.000Z

391

EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona  

Broader source: Energy.gov [DOE]

This EIS, prepared by the Bureau of Land Management with DOE’s Western Area Power Administration as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western’s transmission lines.

392

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

E-Print Network [OSTI]

NREL/CP-500-35969. Global WindPower Conference. Chicago,Transmission Projects. ” Windpower 2007 Conference. Los

Mills, Andrew D.

2009-01-01T23:59:59.000Z

393

EIS-0298: Telephone Flat Geothermal Development Project  

Broader source: Energy.gov [DOE]

This EIS is for a Plan of Operation (POO) for Development and Production; and for a POO for Utilization and Disposal for a proposed geothermal development project, including: a power plant, geothermal production and injection wellfield, ancillary facilities, and transmission line on the Modoc National Forest in Siskiyou and Modoc Counties, California.

394

Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

395

Phase 2 Report: Oahu Wind Integration and Transmission Study...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Phase 2 Report: Oahu Wind Integration and Transmission Study (OWITS) Hawaiian Islands Transmission Interconnection Project Dennis Woodford Electranix Corporation Winnipeg, Manitoba...

396

Investigation of Multi-Frequency Power Transmission and System  

E-Print Network [OSTI]

BACKGROUND .................................................................................. 6 A. High Voltage Direct Current Transmission (HVDC) ................ 6 B. Flexible AC Transmission System (FACTS) ............................ 12... ......................................................................................................................... 80 viii LIST OF FIGURES FIGURE Page 1 Schematic of a HVDC Transmission Line...

Barazarte Conte, Ronald

2012-10-19T23:59:59.000Z

397

Boardman to Hemingway Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareers Apply forBiosurveillance A8 Blythe-Knob

398

An Annotated Bibliography of High-Voltage Direct-Current Transmission and Flexible AC Transmission (FACTS) Devices, 1991-1993.  

SciTech Connect (OSTI)

References are contained for HVDC systems, converter stations and components, overhead transmission lines, cable transmission, system design and operations, simulation of high voltage direct current systems, high-voltage direct current installations, and flexible AC transmission system (FACTS).

Litzenberger, Wayne; Lava, Val

1994-08-01T23:59:59.000Z

399

Biennial Assessment of the Fifth Power Plan Transmission Issues  

E-Print Network [OSTI]

unscheduled electricity flows over transmission lines leading to increased risks to electric system by the partners in the Colstrip 500 kV transmission lines (Northwestern Energy, Puget Sound Energy, Portland

400

Transmission Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Return to Daylight Saving Time Posted: 2232015 Effective Date: 382015 This document provides the procedure for reserving and scheduling transmission that spans the time change...

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Energy Department, Arizona Utilities Announce Transmission Infrastruct...  

Office of Environmental Management (EM)

project that will serve the state's growing electrical energy needs, attract renewable energy development to the area, and strengthen the transmission system in the Southwestern...

402

Case study on the US superconducting power transmission program  

SciTech Connect (OSTI)

After the 1911 discovery of superconductivity (the abrupt loss of electrical resistance in certain materials at very low temperatures), attempts were made to make practical use of this phenomenon. Initially these attempts failed, but in the early 1960s (after 50 years of research) they succeeded. By then, the projected growth in the production and consumption of electrical energy required much higher capacity power transmission capabilities than were available or likely to become available from incremental improvements in existing transmission technology. Since superconductors were capable in principle of transmitting huge amounts of power, research programs to develop and demonstrate superconducting transmission lines were initiated in the US and abroad. The history of the US program, including the participants, their objectives, funding and progress made, is outlined. Since the R&D program was terminated before the technology was completely demonstrated, the reasons for and consequences of this action are discussed in a final section.

Hammel, E.F.

1996-02-01T23:59:59.000Z

403

The Use and Benefits of Video Inspection in Lined and Unlined Ductwork in IAQ Surveys and "Source Removal" Cleaning Projects  

E-Print Network [OSTI]

New technology has developed video equipment capable of inspecting interior lined and unlined ductwork. Where IAQ (Indoor Air Quality) questions require inspections of suspicious air conveyance systems. Video recordings provide useful information...

Kiec, T. M.

404

Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop  

SciTech Connect (OSTI)

In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project team’s work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASC’s Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

Galarowicz, James

2014-01-06T23:59:59.000Z

405

The photospheric solar oxygen project: II. Non-concordance of the oxygen abundance derived from two forbidden lines  

E-Print Network [OSTI]

In the Sun, the two forbidden [OI] lines at 630 and 636 nm were previously found to provide discrepant oxygen abundances. aims: We investigate whether this discrepancy is peculiar to the Sun or whether it is also observed in other stars. method: We make use of high-resolution, high signal-to-noise ratio spectra of four dwarf to turn-off stars, five giant stars, and one sub-giant star observed with THEMIS, HARPS, and UVES to investigate the coherence of the two lines. results: The two lines provide oxygen abundances that are consistent, within observational errors, in all the giant stars examined by us. On the other hand, for the two dwarf stars for which a measurement was possible, for Procyon, and for the sub-giant star Capella, the 636 nm line provides systematically higher oxygen abundances, as already seen for the Sun. conclusions: The only two possible reasons for the discrepancy are a serious error in the oscillator strength of the NiI line blending the 630 nm line or the presence of an unknown blend in...

Caffau, Elisabetta; Malherbe, Jean-M; Bonifacio, Piercarlo; Steffen, Matthias; Monaco, Lorenzo

2013-01-01T23:59:59.000Z

406

Transmission Services J7000  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Business Unit - J7300 CRSP - DSW - RMR Open Access Transmission Tariff Management Transmission Service Requests Interconnection Requests OASIS...

407

Coherent soliton communication lines  

SciTech Connect (OSTI)

The data transmission in coherent fiber-optical communication lines using solitons with a variable phase is studied. It is shown that nonlinear coherent structures (solitons) can be applied for effective signal transmission over a long distance using amplitude and optical-phase keying of information. The optimum ratio of the pulse width to the bit slot at which the spectral efficiency (transmitted bits per second and hertz) is maximal is determined. It is shown that soliton fiber-optical communication lines can ensure data transmission at a higher spectral efficiency as compared to traditional communication lines and at a high signal-to-noise ratio.

Yushko, O. V., E-mail: olesya.yushko@gmail.com; Redyuk, A. A.; Fedoruk, M. P.; Turitsyn, S. K. [Novosibirsk State University (Russian Federation)

2014-11-15T23:59:59.000Z

408

Complex Dynamics of Blackouts in Power Transmission Systems B. A. Carreras and V. E. Lynch  

E-Print Network [OSTI]

the loss of load due to transmission lines reaching their load limits but no line outages. The second type to a dynamic equilibrium. Blackouts are modeled by overloads and outages of transmission lines determined

409

Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)  

SciTech Connect (OSTI)

This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the companyâ??s continued success and growth is directly related to our expertise in applying this program to interesting applications.

Muons, Inc.

2011-05-19T23:59:59.000Z

410

Evaluation of Instrumentation and Dynamic Thermal Ratings for Overhead Lines  

SciTech Connect (OSTI)

In 2010, a project was initiated through a partnership between the Department of Energy (DOE) and the New York Power Authority (NYPA) to evaluate EPRI?s rating technology and instrumentation that can be used to monitor the thermal states of transmission lines and provide the required real-time data for real-time rating calculations. The project included the installation and maintenance of various instruments at three 230 kV line sites in northern New York. The instruments were monitored, and data collection and rating calculations were performed for about a three year period.

Phillips, A.

2013-01-31T23:59:59.000Z

411

EA-1909: South Table Wind Farm Project, Kimball County, Nebraska  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed South Table Wind Project, which would generate approximately 60 megawatts from about 40 turbines, to Western’s existing Archer-Sidney 115-kV Transmission Line in Kimball County, Nebraska.

412

HVDC power transmission technology assessment  

SciTech Connect (OSTI)

The purpose of this study was to develop an assessment of the national utility system`s needs for electric transmission during the period 1995-2020 that could be met by future reduced-cost HVDC systems. The assessment was to include an economic evaluation of HVDC as a means for meeting those needs as well as a comparison with competing technologies such as ac transmission with and without Flexible AC Transmission System (FACTS) controllers. The role of force commutated dc converters was to be assumed where appropriate. The assessment begins by identifying the general needs for transmission in the U.S. in the context of a future deregulated power industry. The possible roles for direct current transmission are then postulated in terms of representative scenarios. A few of the scenarios are illustrated with the help of actual U.S. system examples. non-traditional applications as well as traditional applications such as long lines and asynchronous interconnections are discussed. The classical ``break-even distance`` concept for comparing HVDC and ac lines is used to assess the selected scenarios. The impact of reduced-cost converters is reflected in terms of the break-even distance. This report presents a comprehensive review of the functional benefits of HVDC transmission and updated cost data for both ac and dc system components. It also provides some provocative thoughts on how direct current transmission might be applied to better utilize and expand our nation`s increasingly stressed transmission assets.

Hauth, R.L.; Tatro, P.J.; Railing, B.D. [New England Power Service Co., Westborough, MA (United States); Johnson, B.K.; Stewart, J.R. [Power Technologies, Inc., Schenectady, NY (United States); Fink, J.L.

1997-04-01T23:59:59.000Z

413

EIS-0443: Project Financing for Southwest Intertie Project- South, Clark, Lincoln, Nye, and White Pine Counties, Nevada  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line.

414

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-15)  

SciTech Connect (OSTI)

BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission lines. Work also includes clearing of a small (<1/4 mile) section of access road. All work will be in accordance with the National Electrical Safety Code and BPA standards. See Section 1.1 of the attached checklist for detailed information on each section of the referenced transmission lines. BPA will conduct the vegetation control with the goal of removing tall-growing vegetation that is currently or will soon be a hazard to the transmission lines and where possible to promote low-growing plant communities in the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The vegetation needing control is mainly Douglas Fir, Alder, and blackberries as indicated in Section 1.2 of the attached checklist. The work involved in the ROW includes: clearing tall growing vegetation that is currently or will soon pose a hazard to the lines; treating the associated stumps and re-sprouts with herbicide to ensure that the roots are killed preventing new sprouts; and selectively eliminating tall growing vegetation before it reaches a height or density to begin competing with low-growing vegetation. All work will take place in existing rights-of-ways and around transmission structures. All work will be accomplished by selective vegetation control methods to assure that there is little potential harm to non-target vegetation and to low-growing plants. The work will provide system reliability and fire protection. Also, all off right-of-way trees that are potentially unstable and will fall within a minimum distance or into the zone where the conductors swing will be removed. Access roads will be treated using mowing and herbicide applications. The work will provide system reliability. The subject transmission lines range from 115kV to 230kV and are made up of accompanying access roads, steel and wooden transmission line structures and associated switching platforms. The minimum clearance ranges from 21 feet for 115kV lines to 23 feet for 230kV lines. ROW easement widths vary along the length of the project. Vegetation control for this project is designed to provide a 3 year maintenance free interval. In summary, the overall vegetation management scheme will be to selectively remove tall growing vegetation then apply selective herbicide treatment using cut stump applications.

N /A

2001-06-19T23:59:59.000Z

415

The Appraisal Journal, Price Effects of High Voltage Transmission Lines on Abutting Homes, BPA I-5 Corridor Reinforcement Project, March 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2 and NbSe2 .2004 NorthWeek(activeDirectory:

416

Investing in the NW transmission system - revised Oct 2009.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

that energy. To meet these needs, BPA is proposing adding four new high-voltage transmission lines to its network. One line - the McNary-John Day line - has already undergone...

417

A Transmission-Constrained Unit Commitment Method Chung-Li Tseng, Shmuel S. Oren,  

E-Print Network [OSTI]

. A test problem involving more than 2500 transmission lines and 2200 buses is tested along with other test located in multiple areas that are interconnected via transmission lines. If the transmission constraints are not considered, the sched- ule obtained might cause some transmission lines to be overloaded. In this paper, we

418

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

419

Transmission INTRODUCTION  

E-Print Network [OSTI]

, to a significant degree, on a well-functioning wholesale power market. The transmission system is integral the consequences of a poorly designed wholesale power market, and the Council does not want to see those Regulatory Commission began taking actions to further facilitate competition in wholesale power supply. Today

420

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program  

SciTech Connect (OSTI)

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

Johnson, Justin; Smith, Cale; Young, Mike; Donohoo, Ken; Owen, Ross; Clark, Eddit; Espejo, Raul; Aivaliotis, Sandy; Stelmak, Ron; Mohr, Ron; Barba, Cristian; Gonzalez, Guillermo; Malkin, Stuart; Dimitrova, Vessela; Ragsdale, Gary; Mitchem, Sean; Jeirath, Nakul; Loomis, Joe; Trevino, Gerardo; Syracuse, Steve; Hurst, Neil; Mereness, Matt; Johnson, Chad; Bivens, Carrie

2013-05-04T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Transmission Services  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

an overview of BPA's Dispatcher Standing Order 216 (DSO 216) and the related communication protocolsoptions associated with DSO 216. II. PROJECT DESCRIPTION A. This overall...

422

PV Manufacturing R&D Project Status and Accomplishments Under 'In-Line Diagnostics and Intelligent Processing' and 'Yield, Durability and Reliability'  

SciTech Connect (OSTI)

The PV Manufacturing R&D (PVMR&D) Project conducts cost-shared research and development programs with U.S. PV industry partners. There are currently two active industry partnership activities. 'In-line Diagnostics and Intelligent Processing', launched in 2002, supports development of new in-line diagnostics and monitoring with real-time feedback for optimal process control and increased yield in the fabrication of PV modules, systems, and other system components. 'Yield, Durability and Reliability', launched in late 2004, supports enhancement of PV module, system component, and complete system reliability in high-volume manufacturing. A second key undertaking of the PVMR&D Project is the collection and analysis of module production cost-capacity metrics for the U.S. PV industry. In the period from 1992 through 2005, the average module manufacturing cost in 2005 dollars fell 54% (5.7% annualized) to $2.73/Wp, and the capacity increased 18.5-fold (25% annualized) to 251 MW/yr. An experience curve analysis gives progress ratios of 87% and 81%, respectively, for U.S. silicon and thin-film module production.

Friedman, D. J.; Mitchell, R. L.; Keyes, B. M.; Bower, W. I.; King, R.; Mazer, J. A.

2006-01-01T23:59:59.000Z

423

Identification and definition of unbundled electric generation and transmission services  

SciTech Connect (OSTI)

State and federal regulators, private and public utilities, large and small customers, power brokers and marketers, and others are engaged in major debates about the future structure of the electric industry. Although the outcomes are far from certain, it seems clear that customers will have much greater choices about the electric services they purchase and from whom they buy these services. This report examines the ``ancillary`` services that are today buried within the typical vertically integrated utility. These ancillary services support and make possible the provision of the basic services of generating capacity, energy supply, and power delivery. These ancillary services include: Management of generating units; reserve generating capacity to follow variations in customer loads, to provide capacity and energy when generating units or transmission lines suddenly fall, to maintain electric-system stability, and to provide local-area security; transmission-system monitoring and control; replacement of real power and energy losses; reactive-power management and voltage regulation; transmission reserves; repair and maintenance of the transmission network; metering, billing, and communications; and assurance of appropriate levels of power quality. Our focus in this report, the first output from a larger Oak Ridge National Laboratory project, is on identification and definition of these services. Later work in this project will examine more closely the costs and pricing options for each service.

Kirby, B.; Hirst, E.; Vancoevering, J.

1995-03-01T23:59:59.000Z

424

TRIBAND BRANCH LINE COUPLER USING DOUBLE-LORENTZ  

E-Print Network [OSTI]

TRIBAND BRANCH LINE COUPLER USING DOUBLE-LORENTZ TRANSMISSION LINES Hanseung Lee and Sangwook Nam) transmission lines (TL) provides two additional degrees of freedom in realizing triband microwave devices-Lorentz; transmission lines; triband; directional couplers 1. INTRODUCTION The concept of artificial TLs having

Nam, Sangwook

425

Dynamic Power Flow Controller: Compact Dynamic Phase Angle Regulators for Transmission Power Routing  

SciTech Connect (OSTI)

GENI Project: Varentec is developing compact, low-cost transmission power controllers with fractional power rating for controlling power flow on transmission networks. The technology will enhance grid operations through improved use of current assets and by dramatically reducing the number of transmission lines that have to be built to meet increasing contributions of renewable energy sources like wind and solar. The proposed transmission controllers would allow for the dynamic control of voltage and power flow, improving the grid’s ability to dispatch power in real time to the places where it is most needed. The controllers would work as fail-safe devices whereby the grid would be restored to its present operating state in the event of a controller malfunction instead of failing outright. The ability to affordably and dynamically control power flow with adequate fail-safe switchgear could open up new competitive energy markets which are not possible under the current regulatory structure and technology base.

None

2012-01-03T23:59:59.000Z

426

EA-1581: Sand Hills Wind Project, Wyoming  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with DOE’s Western Area Power Administration as a cooperating agency, was preparing this EA to evaluate the environmental impacts of a proposal to construct, operate, and maintain the Sand Hills Wind Energy Facility on private and federal lands in Albany County, Wyoming. If the proposed action had been implemented, Western would have interconnected the proposed facility to an existing transmission line. This project has been canceled.

427

Transmission Workshop  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestorationAdvisoryManagement andTopKnow? |Transmission

428

Transmission Line MTF: Magnetized Target Fusion  

E-Print Network [OSTI]

/4 = 40 µs cusp coil cusp coil mirror coils cusp coil cap. bank mirror coil cap. bank Electrical Circuit Current vs t Experimental SetupExperimental Setup 32.5 cm 36cm Pre-ionization Experimental Setup Pre-framing photography) Quantitative diagnostics: 1. Interferometry (side-on and end-on) 2. Studying electrical pulse

429

Gila to North Gila Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet Assistance GetGiant Protease TPP II'sGiantGiftGila

430

Gateway West Transmission Line | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation, search Equivalent6894093° Loading69.County, North Carolina:GatewayWest

431

Power line detection system  

DOE Patents [OSTI]

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

Latorre, Victor R. (Tracy, CA); Watwood, Donald B. (Tracy, CA)

1994-01-01T23:59:59.000Z

432

Power line detection system  

DOE Patents [OSTI]

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

Latorre, V.R.; Watwood, D.B.

1994-09-27T23:59:59.000Z

433

Klondike III/Biglow Canyon Wind Integration Project; Final Environmental Impact Statement, September 2006.  

SciTech Connect (OSTI)

BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. (Portland General Electric recently bought the rights to develop the proposed Biglow Canyon Wind Farm from Orion Energy, LLC.) Both wind projects received Site Certificates from the Oregon Energy Facility Siting Council on June 30, 2006. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA 230-kV substation next to BPA's existing John Day 500-kV Substation. BPA is also considering a No Action Alternative in which BPA would not build the transmission line and would not interconnect the wind projects. The proposed BPA and wind projects would be located on private land, mainly used for agriculture. If BPA decides to interconnect the wind projects, construction of the BPA transmission line and substation(s) could commence as early as the winter of 2006-07. Both wind projects would operate for much of each year for at least 20 years. The proposed projects would generally create no or low impacts. Wildlife resources and local visual resources are the only resources to receive an impact rating other than ''none'' or ''low''. The low to moderate impacts to wildlife are from the expected bird and bat mortality and the cumulative impact of this project on wildlife when combined with other proposed wind projects in the region. The low to high impacts to visual resources reflect the effect that the transmission line and the turbine strings from both wind projects would have on viewers in the local area, but this impact diminishes with distance from the project.

United States. Bonneville Power Administration

2006-09-01T23:59:59.000Z

434

Electric Power Generation and Transmission (Iowa)  

Broader source: Energy.gov [DOE]

Electric power generating facilities with a combined capacity greater than 25 MW, as well as associated transmission lines, may not be constructed or begin operation prior to the issuance of a...

435

Tracking Progress Last updated 06/18/2014 Transmission Expansion 1  

E-Print Network [OSTI]

issues certificates of public convenience and necessity (CPCNs) for transmission lines at 200 kilovolts of existing transmission lines are issued a notice of exempt construction (NOC) and are exempt from CPUC CEQA

436

Optoelectronics 514 Transmission Hologram Transmission Hologram  

E-Print Network [OSTI]

Optoelectronics 514 Transmission Hologram Transmission Hologram Purpose: To learn about making Procedure: 1. HeNe Laser: #12;Optoelectronics 514 Transmission Hologram Mount the laser along the long axis. Development #12;Optoelectronics 514 Transmission Hologram Put the plate in the developer emulsion side up

Collins, Gary S.

437

Plains and Eastern Clean Line Transmission Line: Federal Register Notice,  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15, 2010Energy6 Frontera STAT.PaulThe 2014PinellasPioneeringVolume

438

Plains & Eastern Clean Line Transmission Line - Part 2 Application:  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21, 2015 7:00AM to 10:30AM EDT Tuition

439

Plains and Eastern Clean Line Transmission Line: Comments from Ms.  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21, 2015 7:00AM to 10:30AM EDT

440

Plains & Eastern Clean Line Transmission Line - Part 2 Application |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research | Department ofpermitPerformance Audit of thePeterDepartment ofInDepartment

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Nuclear Energy Research Initiative Project No. 02 103 Innovative Low Cost Approaches to Automating QA/QC of Fuel Particle Production Using On Line Nondestructive Methods for Higher Reliability Final Project Report  

SciTech Connect (OSTI)

This Nuclear Energy Research Initiative (NERI) project was tasked with exploring, adapting, developing and demonstrating innovative nondestructive test methods to automate nuclear coated particle fuel inspection so as to provide the United States (US) with necessary improved and economical Quality Assurance and Control (QA/QC) that is needed for the fuels for several reactor concepts being proposed for both near term deployment [DOE NE & NERAC, 2001] and Generation IV nuclear systems. Replacing present day QA/QC methods, done manually and in many cases destructively, with higher speed automated nondestructive methods will make fuel production for advanced reactors economically feasible. For successful deployment of next generation reactors that employ particle fuels, or fuels in the form of pebbles based on particles, extremely large numbers of fuel particles will require inspection at throughput rates that do not significantly impact the proposed manufacturing processes. The focus of the project is nondestructive examination (NDE) technologies that can be automated for production speeds and make either: (I) On Process Measurements or (II) In Line Measurements. The inspection technologies selected will enable particle “quality” qualification as a particle or group of particles passes a sensor. A multiple attribute dependent signature will be measured and used for qualification or process control decisions. A primary task for achieving this objective is to establish standard signatures for both good/acceptable particles and the most problematic types of defects using several nondestructive methods.

Ahmed, Salahuddin; Batishko, Charles R.; Flake, Matthew; Good, Morris S.; Mathews, Royce; Morra, Marino; Panetta, Paul D.; Pardini, Allan F.; Sandness, Gerald A.; Tucker, Brian J.; Weier, Dennis R.; Hockey, Ronald L.; Gray, Joseph N.; Saurwein, John J.; Bond, Leonard J.; Lowden, Richard A.; Miller, James H.

2006-02-28T23:59:59.000Z

442

EA-1966: Sunflower Wind Project, Hebron, North Dakota  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) prepared an EA to evaluate potential environmental impacts of interconnecting a proposed 80 MW generating facility south of Hebron in Morton and Stark Counties, North Dakota. The proposed wind generating facility of 30-50 wind turbines encompassed approximately 9,000 acres. Ancillary facilities included an underground collection line system, a project substation, one mile of new transmission line, a new switchyard facility on the existing Dickinson-Mandan 230 kV line owned and operated by Western, one permanent meteorological tower, new access roads, and an operations and maintenance building.

443

Optimal Transmission Switching in Electric Networks for Improved Economic Operations1  

E-Print Network [OSTI]

. Abstract Growing demand for electric power seems to necessitate new transmission lines, but obstacles transmission lines is a common practice done with a mature technology. Circuit breakers are used to open and close transmission lines. System operators can, and do, change the topology of systems to improve

Ferris, Michael C.

444

Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

N /A

2004-10-21T23:59:59.000Z

445

Chapter 2 Transmission Facility Siting, Route Segments and Action...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft EIS November 2012 BPA considers many factors when siting proposed new transmission lines. Once the need for a new line in a particular area or region is identified,...

446

Power Flow Controller for Renewables: Transformer-less Unified Power Flow Controller for Wind and Solar Power Transmission  

SciTech Connect (OSTI)

GENI Project: MSU is developing a power flow controller to improve the routing of electricity from renewable sources through existing power lines. The fast, innovative, and lightweight circuitry that MSU is incorporating into its controller will eliminate the need for a separate heavy and expensive transformer, as well as the construction of new transmission lines. MSU’s controller is better suited to control power flows from distributed and intermittent wind and solar power systems than traditional transformer-based controllers are, so it will help to integrate more renewable energy into the grid. MSU‘s power flow controller can be installed anywhere in the existing grid to optimize energy transmission and help reduce transmission congestion.

None

2012-02-08T23:59:59.000Z

447

Key-shift transmission  

SciTech Connect (OSTI)

A key-shift transmission is described, characterized by the speed-change shaft being divided into a pair of trough-shaped shaft halves each having an arched inner surface which defines a part of a cylindrical bore extending axially through the speed-change shaft thereby the shaft being formed into a hollow shaft, and by each of the shaft halves including a pair of flattened end surfaces which extend axially of each shaft half at both sides of the inner surface, one of the end surfaces having thereon an axially elongated projection and the other of the end surfaces having herein an axially elongated recess of a depth smaller than the height of the projection. The pair of shaft halves are engaged to each other co-rotatably by fitting the projections of the respective shaft halves into the recesses of the respective shaft halves so as to form in an outer surface of the speed-change shaft a pair of elongated axial grooves which are located radially outwardly of the elongated projections of the respective shaft halves and between the flattened end surfaces of the respective shaft halves. A pair of the shift keys are disposed within the pair of elongated axial grooves.

Nemoto, S.

1989-03-07T23:59:59.000Z

448

Microsoft PowerPoint - WAPA Transmission Developments in NM ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Alamos National Labs Study Los Alamos National Labs Study MOU with GSIP Eminent Domain Procedures High Lonesome Mesa Project 2 State Transmission Authorities RETA was...

449

Decision-Support Software for Grid Operators: Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation  

SciTech Connect (OSTI)

GENI Project: The CRA team is developing control technology to help grid operators more actively manage power flows and integrate renewables by optimally turning on and off entire power lines in coordination with traditional control of generation and load resources. The control technology being developed would provide grid operators with tools to help manage transmission congestion by identifying the facilities whose on/off status must change to lower generation costs, increase utilization of renewable resources and improve system reliability. The technology is based on fast optimization algorithms for the near to real-time change in the on/off status of transmission facilities and their software implementation.

None

2012-03-16T23:59:59.000Z

450

Authorization of Line Extension (Nebraska)  

Broader source: Energy.gov [DOE]

Any entity permitted to establish an electric light and power plant, and/or transmission or distribution lines within a city, village, or public electric light and power district, may also extend...

451

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

452

Merchant transmission investment  

E-Print Network [OSTI]

We examine the performance attributes of a merchant transmission investment framework that relies on "market driven" transmission investment to provide the infrastructure to support competitive wholesale markets for ...

Joskow, Paul L.

2003-01-01T23:59:59.000Z

453

Microsoft Word - Broadband Over Power Lines_FINAL.06.01.10.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Broadband over Powerlines Can Accelerate the Transmission Smart Grid May 25, 2010 DOENETL-20101418 Broadband Over Power Lines Could Accelerate the Transmission Smart Grid...

454

IMPEE PhD Opportunity Project title: LightFoot PhD A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal  

E-Print Network [OSTI]

to simulate this behaviour. This is to provide guidance to overhead line design engineers on lightening Overhead Lines with Non-Ideal Tower Footing Resistance Supervisor(s): Dr Jonathan Swingler j.swingler@hw.ac.uk Abstract LightFoot PhD ­ A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal Tower

Greenaway, Alan

455

ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE  

SciTech Connect (OSTI)

This report outlines the results of a study of the impact of climate change on the energy infrastructure of California and the San Francisco Bay region, including impacts on power plant generation; transmission line and substation capacity during heat spells; wildfires near transmission lines; sea level encroachment upon power plants, substations, and natural gas facilities; and peak electrical demand. Some end-of-century impacts were projected:Expected warming will decrease gas-fired generator efficiency. The maximum statewide coincident loss is projected at 10.3 gigawatts (with current power plant infrastructure and population), an increase of 6.2 percent over current temperature-induced losses. By the end of the century, electricity demand for almost all summer days is expected to exceed the current ninetieth percentile per-capita peak load. As much as 21 percent growth is expected in ninetieth percentile peak demand (per-capita, exclusive of population growth). When generator losses are included in the demand, the ninetieth percentile peaks may increase up to 25 percent. As the climate warms, California's peak supply capacity will need to grow faster than the population.Substation capacity is projected to decrease an average of 2.7 percent. A 5C (9F) air temperature increase (the average increase predicted for hot days in August) will diminish the capacity of a fully-loaded transmission line by an average of 7.5 percent.The potential exposure of transmission lines to wildfire is expected to increase with time. We have identified some lines whose probability of exposure to fire are expected to increase by as much as 40 percent. Up to 25 coastal power plants and 86 substations are at risk of flooding (or partial flooding) due to sea level rise.

Sathaye, Jayant; Dale, Larry; Larsen, Peter; Fitts, Gary; Koy, Kevin; Lewis, Sarah; Lucena, Andre

2011-06-22T23:59:59.000Z

456

New protection method for HVDC lines including cables  

SciTech Connect (OSTI)

For the third project of the Hokkaido-Honshu HVDC Link in Japan, called the HVDC Link III project (rated at 250 kVdc-1,200 A-300 MW), the authors developed an HVDC transmission line protection method based on a new working principle that allows high-speed and highly sensitive detection of faults, enhancing reliability in the supply of electric power. In general, increasing the sensitivity of relays will lead to an increased likelihood of undesired operation whereas lowering the sensitivity will impair the responsiveness of the relays. The proposed method meets these apparently incompatible requirements very well. Basically classified as a differential scheme, the HVDC transmission line protection method compensates for a charging and discharging current that flows through the line-to-ground capacitance at times of voltage variations caused by a line fault or by the operation of dc power systems. The developed protection method is also characterized in that it uses current changes induced by voltage variations to restrain the operation of a relay. This configuration has made the proposed method far superior in responsiveness and sensitivity to the conventional protection method. A simulation using an EMTP (Electro-Magnetic Transients Program) was conducted on this method. Developed relay equipment embodying the new protection method was subjected to various verification tests, where this equipment was connected to a power system simulator, before being delivered to the HVDC Link III facility.

Takeda, H.; Ayakawa, H.; Tsumenaga, N.; Sanpei, M.

1995-10-01T23:59:59.000Z

457

The aftermath of primary power and its implications for independent transmission in PJM  

SciTech Connect (OSTI)

The recent decision by the Federal Energy Regulatory Commission in ''Primary Power'' will have fundamental ramifications for transmission investment in the far-reaching PJM footprint. This decision, which is pending on rehearing and will likely be appealed, will determine whether transmission projects that are entitled to regulated rate recovery under the PJM tariff can only be built by incumbent transmission owners and whether new independent transmission entities are limited to building transmission projects on a ''merchant'' basis. (author)

Farrah, Elias G.; Elstein, S. Shamai

2010-08-15T23:59:59.000Z

458

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Air Conditioner Testing in WECC,” IEEE Power  Engineering Air Conditioner Modeling, WECC Load Modeling Task  Force in power system studies: WECC progress update,? Power and 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

459

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Lights HVAC Figure 15 Demand Response and Market AnalysisHVAC Load % of Total Hour of Day Figure 16 Demand Response and Market

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

460

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

32   Figure  13  Voltage  Oscillation  Test.   The  applied calculated from measurements for the voltage oscillation from  measurements  for  the  voltage  oscillation 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

the set temperature ? Power loss and initial electronicsprotection even at total power loss Table 5 provides thenot activate with total power loss or electronics shutdown ?

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

462

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

2009.   Inverter  Test Procedures Solar Generation Impact Conditioner Testing Procedures  Appendix B: Air Conditioner air conditioner testing procedures and results from studies 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

463

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

Unit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FANUnit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FANUnit Evaporator Coil Size (Tons) Compressor Type Refrigerant SEER FAN

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

464

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

components such as power sources, loads,  transformers and components such as power sources, loads,  transformers and 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

465

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

to be the compact fluorescent bulbs (CFBs) that the engineerbulbs with compact fluorescent bulbs (CFBs) continues to

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

466

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

pump heating fraction, EF heatpump , shall be the fraction q P p P q (P) (Q) (B) Lighting Washing Heating 0.1F heatpump0.3F heatpump Cooling Refrigeration Z q Hotwater Plugs Z p (

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

467

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

2, 2007, report issued by EPRI under SCE contract.   Reza, 2, 2007, report issued by EPRI under SCE contract. R. Bravo,System Stability and Control, EPRI Power System Engineering

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

468

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

commercial building energy use and cost analysis. With input of building layout, construction types, space usage,

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

469

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

solar insulation.    PV variable voltage input DC-DC converter with peak power trackersolar insolation.    PV variable voltage input DC-DC converter with peak power tracker

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

470

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

like hardware (PMU), software and data communication. TheSpecifications and Technical Data PMU Model Number of NumberPMU Specifications and Technical Data ..

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

471

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

R22 PMAXLow (PSI) Phase Refrigerant Charge (LBS) Voltage (V)LRA (AMPS) Phase Refrigerant Charge (LBS) Voltage (V) PMAXR22 PMAXLow (PSI) Phase Refrigerant Charge (LBS) Voltage (V)

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

472

Mountain States Transmission Intertie (MSTI) Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment SurfacesResource ProgramModification andinterface1 EEnergy, OfficeMotors SignMSTI

473

SunZia Southwest Transmission Project Comments  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestoration at Young -Final ProgramAbout » SunShot Vision

474

Transmission Infrastructure Investment Projects (2009) | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of EnergyThe SunMelissa Howell | Department ofKnow?Energy

475

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism in Layered NbS2Topo II: AnTraining andfor a Clean Energy Future

476

Eldorado Ivanpah Transmission Project | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classified asThisEcoGridCounty,Portal,105. It isEldersburg,Eldorado

477

FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH  

E-Print Network [OSTI]

9   1.2.1.   Air Conditioner Testing and 16   2.0   Air Conditioner Results of Residential Air Conditioner Testing in WECC,” 

Lesieutre, Bernard

2013-01-01T23:59:59.000Z

478

EA-1849: Ormat Nevada Geothermal Projects in Northern NV | Department...  

Broader source: Energy.gov (indexed) [DOE]

of Land Management's Environmental Assessment T G Power LLC Hot Sulphur Springs Transmission Line, 120 kV Electric Power Line, Northern Independence Valley, Elko County, Nevada...

479

Independent Verification Survey Report for the Offsite Portion of the Potential Release Site-7 Abandoned Sanitary Line, Miamisburg Closure Project, Miamisburg, Ohio  

SciTech Connect (OSTI)

The ORISE objective was to confirm that the remedial action process implemented by the contractor was in accordance with the PRS-7 Work Package. Following removal of the sanitary line, the soil beneath the line would be sampled to determine if remediation was required (ARC 2007a).

P.C. Weaver

2008-08-15T23:59:59.000Z

480

Africa planned gas lines will meet future demand  

SciTech Connect (OSTI)

The burgeoning European market for natural gas is expected to create major gas line construction. The potential for North Africa looks particularly promising in 1991. Italy's ENI has proposed a 6,000-km (3,728-mi) gas network in North Africa to connect gas-rich Libya and Algeria with Morocco and Mauritania, making large volumes available to the European market. According to the proposal, a gas line would run from the Sirte Basin in Libya west to Mauritania. Extending the line eastward through Egypt and on to the Arabian Peninsula would provide export access. In this paper initial studies are examine reserve projections for the next 20 years, then based on results, a transmission/distribution network will be designed, including an offshore gathering system.

Not Available

1991-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "line transmission project" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Analysis of operations and cyber security policies for a system of cooperating Flexible Alternating Current Transmission System (FACTS) devices.  

SciTech Connect (OSTI)

Flexible Alternating Current Transmission Systems (FACTS) devices are installed on electric power transmission lines to stabilize and regulate power flow. Power lines protected by FACTS devices can increase power flow and better respond to contingencies. The University of Missouri Rolla (UMR) is currently working on a multi-year project to examine the potential use of multiple FACTS devices distributed over a large power system region in a cooperative arrangement in which the FACTS devices work together to optimize and stabilize the regional power system. The report describes operational and security challenges that need to be addressed to employ FACTS devices in this way and recommends references, processes, technologies, and policies to address these challenges.

Phillips, Laurence R.; Tejani, Bankim; Margulies, Jonathan; Hills, Jason L.; Richardson, Bryan T.; Baca, Micheal J.; Weiland, Laura

2005-12-01T23:59:59.000Z

482

Energy Transmission and Infrastructure  

SciTech Connect (OSTI)

The objective of Energy Transmission and Infrastructure Northern Ohio (OH) was to lay the conceptual and analytical foundation for an energy economy in northern Ohio that will: • improve the efficiency with which energy is used in the residential, commercial, industrial, agricultural, and transportation sectors for Oberlin, Ohio as a district-wide model for Congressional District OH-09; • identify the potential to deploy wind and solar technologies and the most effective configuration for the regional energy system (i.e., the ratio of distributed or centralized power generation); • analyze the potential within the district to utilize farm wastes to produce biofuels; • enhance long-term energy security by identifying ways to deploy local resources and building Ohio-based enterprises; • identify the policy, regulatory, and financial barriers impeding development of a new energy system; and • improve energy infrastructure within Congressional District OH-09. This objective of laying the foundation for a renewable energy system in Ohio was achieved through four primary areas of activity: 1. district-wide energy infrastructure assessments and alternative-energy transmission studies; 2. energy infrastructure improvement projects undertaken by American Municipal Power (AMP) affiliates in the northern Ohio communities of Elmore, Oak Harbor, and Wellington; 3. Oberlin, OH-area energy assessment initiatives; and 4. a district-wide conference held in September 2011 to disseminate year-one findings. The grant supported 17 research studies by leading energy, policy, and financial specialists, including studies on: current energy use in the district and the Oberlin area; regional potential for energy generation from renewable sources such as solar power, wind, and farm-waste; energy and transportation strategies for transitioning the City of Oberlin entirely to renewable resources and considering pedestrians, bicyclists, and public transportation as well as drivers in developing transportation policies; energy audits and efficiency studies for Oberlin-area businesses and Oberlin College; identification of barriers to residential energy efficiency and development of programming to remove these barriers; mapping of the solar-photovoltaic and wind-energy supply chains in northwest Ohio; and opportunities for vehicle sharing and collaboration among the ten organizations in Lorain County from the private, government, non-profit, and educational sectors. With non-grant funds, organizations have begun or completed projects that drew on the findings of the studies, including: creation of a residential energy-efficiency program for the Oberlin community; installation of energy-efficient lighting in Oberlin College facilities; and development by the City of Oberlin and Oberlin College of a 2.27 megawatt solar photovoltaic facility that is expected to produce 3,000 megawatt-hours of renewable energy annually, 12% of the College’s yearly power needs. Implementation of these and other projects is evidence of the economic feasibility and technical effectiveness of grant-supported studies, and additional projects are expected to advance to implementation in the coming years. The public has benefited through improved energydelivery systems and reduced energy use for street lighting in Elmore, Oak Harbor, and Wellington; new opportunities for assistance and incentives for residential energy efficiency in the Oberlin community; new opportunities for financial and energy savings through vehicle collaboration within Lorain County; and decreased reliance on fossil fuels and expanded production of renewable energy in the region. The dissemination conference and the summary report developed for the conference also benefited the public, but making the findings and recommendations of the regional studies broadly available to elected officials, city managers, educators, representatives of the private sector, and the general public.

Mathison, Jane

2012-12-31T23:59:59.000Z

483

Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

United States. Bonneville Power Administration

2006-10-25T23:59:59.000Z

484

Automated manual transmission controller  

DOE Patents [OSTI]

A powertrain system for a hybrid vehicle. The hybrid vehicle includes a heat engine, such as a diesel engine, and an electric machine, which operates as both an electric motor and an alternator, to power the vehicle. The hybrid vehicle also includes a manual-style transmission configured to operate as an automatic transmission from the perspective of the driver. The engine and the electric machine drive an input shaft which in turn drives an output shaft of the transmission. In addition to driving the transmission, the electric machine regulates the speed of the input shaft in order to synchronize the input shaft during either an upshift or downshift of the transmission by either decreasing or increasing the speed of the input shaft. When decreasing the speed of the input shaft, the electric motor functions as an alternator to produce electrical energy which may be stored by a storage device. Operation of the transmission is controlled by a transmission controller which receives input signals and generates output signals to control shift and clutch motors to effect smooth launch, upshift shifts, and downshifts of the transmission, so that the transmission functions substantially as an automatic transmission from the perspective of the driver, while internally substantially functioning as a manual transmission.

Lawrie, Robert E. (Whitmore Lake, MI); Reed, Jr., Richard G. (Royal Oak, MI); Bernier, David R. (Rochester Hills, MI)

1999-12-28T23:59:59.000Z

485

Electricity Transmission, Pipelines, and National Trails. An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii  

SciTech Connect (OSTI)

As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines. Based on Platts electrical transmission line data, a total of 101 existing intersections with national trails on federal land were found, and 20 proposed intersections. Transmission lines and pipelines are proposed in Alaska; however there are no locations that intersect national trails. Source data did not indicate any planned transmission lines or pipelines in Hawaii. A map atlas provides more detailed mapping of the topics investigated in this study, and the accompanying GIS database provides the baseline information for further investigating locations of interest. In many cases the locations of proposed transmission lines are not accurately mapped (or a specific route may not yet be determined), and accordingly the specific crossing locations are speculative. However since both national trails and electrical transmission lines are long linear systems, the characteristics of the crossings reported in this study are expected to be similar to both observed characteristics of the existing infrastructure provided in this report, and of the new infrastructure if these proposed projects are built. More focused study of these siting challenges is expected to mitigate some of potential impacts by choosing routes that minimize or eliminate them. The current study primarily addresses a set of screening-level characterizations that provide insights into how the National Trail System may influence the siting of energy transport facilities in the states identified under Section 368(b) of the Energy Policy Act of 2005. As such, it initializes gathering and beginning analysis of the primary environmental and energy data, and maps the contextual relationships between an important national environmental asset and how this asset intersects with energy planning activities. Thus the current study sets the stage for more in-depth analyses and data development activities that begin to solve key transmission siting constraints. Our recommendations for future work incorporate two major areas: (1) database development and analytics and (2) modeling and scenario analysis for energy planning. These recommendations provide a path forward to address key issues originally developed under the Energy Policy Act of 2005 that are now being carried forward under the President’s Climate Action Plan.

Kuiper, James A; Krummel, John R; Hlava, Kevin J; Moore, H Robert; Orr, Andrew B; Schlueter, Scott O; Sullivan, Robert G; Zvolanek, Emily A

2014-03-25T23:59:59.000Z

486

Early-Time Behavior of the Ground Transient Resistance of Overhead Lines  

E-Print Network [OSTI]

contribution to the transient response of overhead transmission lines. While the late-time behaviour. This expression can be used for the transient analysis of transmission lines in a computationally efficient way of overhead transmission lines to external disturbances like lightning discharges [1, 2]. This impedance

Loyka, Sergey

487

HVDC transmission: a path to the future?  

SciTech Connect (OSTI)

Direct current transmission has been the poor stepchild of the U.S. electric industry. Although early-generation plants were based on DC technology, it was soon deemed uneconomical to transmit electricity over long distances, but it now appears poised for a change. Both the increasing technical potential and changing economics of HVDC lines promise a growing role in the future. (author)

Teichler, Stephen L.; Levitine, Ilia

2010-05-15T23:59:59.000Z

488

Project Project HQ City HQ State ARRA Funding Total Value Additional  

Open Energy Info (EERE)

ALLETE Inc d b a Minnesota Power Smart Grid Project ALLETE Inc d b a Minnesota Power Smart Grid Project Duluth Minnesota American Transmission Company LLC II Smart Grid Project...

489

EIS-0439: Rice Solar Energy Project, Riverside County, California  

Broader source: Energy.gov [DOE]

This environmental review was prepared by DOE’s Western Area Power Administration with the Department of the Interior’s Bureau of Land Management (BLM) as a cooperating agency. This EIS evaluates the environmental impacts of the Rice Solar Energy Project, a 150-megawatt solar concentrating electric powerplant proposed to be constructed on private land in the Sonoran Desert. DOE’s Western Area Power Administration actions under this proposal include building and operating a new substation to interconnect the solar project to Western’s transmission system. DOE may also use this EIS as part of its decision whether to issue a Federal loan guarantee to support the proposal. BLM’s actions under this proposal includes amending California Desert Conservation Area Plan to designate a new corridor for a 161-kV transmission line, which would facilitate the development of solar energy on private lands.

490

State Transmission Infrastructure Authorities: The Story So Far; December 2007 - December 2008  

SciTech Connect (OSTI)

This report examines the status and future direction of state transmission infrastructure authorities. It summarizes common characteristics, discusses current transmission projects, and outlines common issues the state infrastructure authorities have faced.

Porter, K.; Fink. S.

2008-05-01T23:59:59.000Z

491

Transmission Investment Timing and Sizing under Uncertainty Afzal Siddiqui  

E-Print Network [OSTI]

of a private investor holding a perpetual option to construct a transmission line. Using the real options-reverting process 1 Introduction Given the dependence of modern society on electricity, increased reliability than cost reduction. In deregulated electricity industries with functioning markets, transmission

Guillas, Serge

492

The ATLAS 3D project - XVI. Physical parameters and spectral line energy distributions of the molecular gas in gas-rich early-type galaxies  

E-Print Network [OSTI]

[Abridged] We present a detailed study of the physical properties of the molecular gas in a sample of 18 molecular gas-rich early-type galaxies (ETGs) from the ATLAS$ 3D sample. Our goal is to better understand the star formation processes occurring in those galaxies, starting here with the dense star-forming gas. We use existing integrated $^{12}$CO(1-0, 2-1), $^{13}$CO(1-0, 2-1), HCN(1-0) and HCO$^{+}$(1-0) observations and present new $^{12}$CO(3-2) single-dish data. From these, we derive for the first time the average kinetic temperature, H$_{2}$ volume density and column density of the emitting gas, this using a non-LTE theoretical model. Since the CO lines trace different physical conditions than of those the HCN and HCO$^{+}$ lines, the two sets of lines are treated separately. We also compare for the first time the predicted CO spectral line energy distributions (SLEDs) and gas properties of our molecular gas-rich ETGs with those of a sample of nearby well-studied disc galaxies. The gas excitation con...

Bayet, Estelle; Davis, Timothy A; Young, Lisa M; Crocker, Alison F; Alatalo, Katherine; Blitz, Leo; Bois, Maxime; Bournaud, Frédéric; Cappellari, Michele; Davies, Roger L; de Zeeuw, P T; Duc, Pierre-Alain; Emsellem, Eric; Khochfar, Sadegh; Krajnovi?, Davor; Kuntschner, Harald; McDermid, Richard M; Morganti, Raffaella; Naab, Thorsten; Oosterloo, Tom; Sarzi, Marc; Scott, Nicholas; Serra, Paolo; Weijmans, Anne-Marie

2012-01-01T23:59:59.000Z

493

(DOE/EIS-0285/SA-02): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

Franklin- Riverview; Taylor Flats Tap; Walla Walla-Pendleton; and McNary-Slatt Transmission lines. Location: All ROWs are located in the Walla Walla Region. Proposed by:...

494

Patterns of transmission investment  

E-Print Network [OSTI]

This paper examines a number of issues associated with alternative analytical approaches for evaluating investments in electricity transmission infrastructure and alternative institutional arrangements to govern network ...

Joskow, Paul L.

2005-01-01T23:59:59.000Z

495

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

Authors James Bartridge Judy Grau Mark Hesters Don Kondoleon Chuck Najarian Contributing Authors Grace: Bartridge, James, Judy Grau, Mark Hesters, Don Kondoleon, Chuck Najarian. 2007 Strategic Transmission

496

Collaborative Transmission Technology Roadmap  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

techniques, and tools to analyze data from power quality recorders Size-up demand response opportunities Transmission level monitoring with PMUs is not sufficient and needs to...

497

Transmission Enhancement Technology Report  

E-Print Network [OSTI]

of Existing Transmission 6 5. Potential New Equipment to Improve Transmission Capability 9 6. Potential New parties for the sites that should be studied as potential locations for new generation and to consult lignite and wind energy. " As per the requirements of the above-referenced Congressional direction

498

(DOE/EIS-0285/SA-45): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

2002. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and...

499

(DOE/EIS-0285/SA-46): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

2002. Analysis: This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and...

500

(DOE/EIS-0285/SA-06): Supplement Analysis for the Transmission...  

Broader source: Energy.gov (indexed) [DOE]

This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision...