1

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

2

Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles  

E-Print Network [OSTI]

Predicting Hurricane Intensity and Structure Changes Associated with Eyewall Replacement Cycles replacement cycles are commonly observed in tropical cyclones and are well known to cause fluctuations associated with eyewall replacement cycles in Atlantic Ocean hurricanes. The model input comprises

Kossin, James P.

3

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington  

Broader source: Energy.gov [DOE]

This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

4

Design and development of a 3He replacement safeguards neutron counter based on 10B-lined proportional detector technology  

SciTech Connect (OSTI)

This presentation represents an overview of the experimental evaluation of a boron-lined proportional technology performed within an NA-241 sponsored project on testing of boron-lined proportional counters for the purpose of replacement of {sup 3}He technologies. The presented boron-lined technology will be utilized in a design of a full scale safeguards neutron coincidence counter. The design considerations and the Monte Carlo performance predictions for the counter are also presented.

Henzlova, Daniela [Los Alamos National Laboratory; Evans, Louise [Los Alamos National Laboratory; Menlove, Howard O. [Los Alamos National Laboratory; Swinhoe, Martyn T. [Los Alamos National Laboratory; Rael, Carlos D. [Los Alamos National Laboratory; Martinez, Isaac P. [Los Alamos National Laboratory; Marlow, Johnna B. [Los Alamos National Laboratory

2012-07-16T23:59:59.000Z

5

Line geometry and electromagnetism I: basic structures  

E-Print Network [OSTI]

Some key notions of line geometry are recalled, along with their application to mechanics. It is then shown that most of the basic structures that one introduces in the pre-metric formulation of electromagnetism can be interpreted directly in terms of corresponding concepts in line geometry. The results are summarized in a table.

D. H. Delphenich

2013-09-11T23:59:59.000Z

6

Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization  

DOE Patents [OSTI]

Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes. 21 figs.

Jankowiak, R.J.; Small, G.J.; Shields, P.A.

1999-04-27T23:59:59.000Z

7

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 A 13T CMOS Hardened Memory Cell for  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) ray neutrons and -particles [1].These energy particles travel through the silicon bulk and create

Ayers, Joseph

8

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--The aggressive scaling of CMOS into the deep  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) particles travelling through the silicon bulk can create minority carriers. These carriers may be collected

Ayers, Joseph

9

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Analysis and Design of Nanoscale CMOS  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) ray neutrons and -particles [1]. These energy particles travel through the silicon bulk and create

Ayers, Joseph

10

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--Magnetic sensors capable of detecting tiny ac  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) , PA 16802 USA. temperature and ultra-sensitive magnetometers. Such bulk sensors constructed from ME

Yener, Aylin

11

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--The smart grid paradigm is set to revolutionize  

E-Print Network [OSTI]

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) from tens of kilovolts to hundreds of kilovolts for transmission of bulk energy over long distances

Atkinson, Robert C

12

Reliability of Nano-Structured Nickel Interconnections Replacing FlipChip Solder Assembly without Underfill  

E-Print Network [OSTI]

Reliability of Nano-Structured Nickel Interconnections Replacing FlipChip Solder Assembly without of Technology, GA 30332-0560 Abstract This paper reports the reliability of fine pitch interconnections using lower stresses in the interconnections and enhance reliability though they add electrical parasitics

Swaminathan, Madhavan

13

222-S radioactive liquid waste line replacement and 219-S secondary containment upgrade, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) is proposing to: (1) replace the 222-S Laboratory (222-S) radioactive liquid waste drain lines to the 219-S Waste Handling Facility (219-S); (2) upgrade 219-S by replacing or upgrading the waste storage tanks and providing secondary containment and seismic restraints to the concrete cells which house the tanks; and (3) replace the transfer lines from 219-S to the 241-SY Tank Farm. This environmental assessment (EA) has been prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] 1500-1508), and the DOE Implementing Procedures for NEPA (10 CFR 1021). 222-S is used to perform analytical services on radioactive samples in support of the Tank Waste Remediation System and Hanford Site environmental restoration programs. Activities conducted at 222-S include decontamination of analytical processing and support equipment and disposal of nonarchived radioactive samples. These activities generate low-level liquid mixed waste. The liquid mixed waste is drained through pipelines in the 222-S service tunnels and underground concrete encasements, to two of three tanks in 219-S, where it is accumulated. 219-S is a treatment, storage, and/or disposal (TSD) unit, and is therefore required to meet Washington Administrative Code (WAC) 173-303, Dangerous Waste Regulations, and the associated requirements for secondary containment and leak detection. The service tunnels are periodically inspected by workers and decontaminated as necessary to maintain as low as reasonably achievable (ALARA) radiation levels. Although no contamination is reaching the environment from the service tunnels, the risk of worker exposure is present and could increase. 222-S is expected to remain in use for at least the next 30 years to serve the Hanford Site environmental cleanup mission.

NONE

1995-01-01T23:59:59.000Z

14

Structural Optimization of High Voltage Transmission Line Towers considering  

E-Print Network [OSTI]

Structural Optimization of High Voltage Transmission Line Towers considering Continuum and Discrete/or to common designs largely repeated (e.g. automotive compo- nents), and high voltage transmission towers can than conventional designs of high voltage transmission line towers. The optimization model proposed

Colominas, Ignasi

15

Cluster Masses Accounting for Structure along the Line of Sight  

E-Print Network [OSTI]

Weak gravitational lensing of background galaxies by foreground clusters offers an excellent opportunity to measure cluster masses directly without using gas as a probe. One source of noise which seems difficult to avoid is large scale structure along the line of sight. Here I show that, by using standard map-making techniques, one can minimize the deleterious effects of this noise. The resulting uncertainties on cluster masses are significantly smaller than when large scale structure is not properly accounted for, although still larger than if it was absent altogether.

Scott Dodelson

2003-09-09T23:59:59.000Z

16

Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters  

E-Print Network [OSTI]

, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

17

Radial transmission line analysis of multi-layer structures  

SciTech Connect (OSTI)

The analysis of multi-layer beam tubes is a standard problem and involves axially propagating waves. This treatment is ill suited to a short multi-layer structure such as the present example of a ferrite covered ceramic break in the beam tube at the ERL photo-cathode electron gun. This paper demonstrates that such structure can better be treated by radial wave propagation. The theoretical method is presented and numerical results are compared with measured network analyser data and Microwave Studio generated simulations. The results confirm the concept of radial transmission lines as a valid analytical method. An Energy Recovery Linac (ERL) is being constructed at this laboratory for the purpose of research towards an envisioned Electron Ion Collider. One of the pertinent topics is damping of Higher Order Modes (HOM). In this ERL, the damping is provided by ferrite absorbers in the beam tube. A modified version thereof, a ceramic break surrounded by ferrite, is planed for the superconducting electron gun. The damper here is located at room temperature just outside of the gun. If used in a cavity chain, the ceramic break is in the vacuum tube at helium temperature whereas the ferrite is moved into the cryostat insulating vacuum allowing higher temperatures. The general properties of the ferrite HOM dampers have been published but are more detailed in this paper.

Hahn, H.; Hammons, L.

2011-03-28T23:59:59.000Z

18

Electrical structure beneath the northern MELT line on the East Pacific Rise at 15450  

E-Print Network [OSTI]

Electrical structure beneath the northern MELT line on the East Pacific Rise at 15°450 S Kiyoshi] The electrical structure of the upper mantle beneath the East Pacific Rise (EPR) at 15°450 S is imaged structure beneath the northern MELT line on the East Pacific Rise at 15°450 S, Geophys. Res. Lett., 33, L

Brest, Université de

19

Fractal Structure of Isothermal Lines and Loops on the Cosmic Microwave Background  

E-Print Network [OSTI]

Fractal Structure of Isothermal Lines and Loops on the Cosmic Microwave Background Naoki KOBAYASHI and the fractal structure is confirmed in the radiation temperature fluctuation. We estimate the fractal exponents, such as the fractal dimension De of the entire pattern of isothermal lines, the fractal dimension Dc of a single

Chiang, Lung-Yih

20

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 The Utilization of Satellite Images to Identify  

E-Print Network [OSTI]

The Utilization of Satellite Images to Identify Trees Endangering Transmission Lines Y. Kobayashi, G. G. Karady, G to determine tree interference with overhead transmission lines. Index Terms-- satellite images, tree trimming a transmission lines may inter- fere with circuit operation and may produce short cir- cuits. As a typical

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

New rest wavelength determinations for 7 mid-infrared fine structure lines by ISO-SWS  

E-Print Network [OSTI]

Observations of the planetary nebulae NGC6302, NGC6543 and NGC7027 by the Short Wavelength Spectrometer (SWS) on board the Infrared Space Observatory (ISO) have been used to determine rest wavelengths of spectral lines. We report on improved accuracies for wavelengths of 7 mid-infrared ionic fine structure lines.

H. Feuchtgruber; D. Lutz; D. A. Beintema

2001-05-15T23:59:59.000Z

22

Microsoft Word - Deering Lake-Eckley 115-kV Transmission Line Structure Replacements, Yuma County, CO  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces andMappingENVIRONMENTAL IMPACTApproved:GEORGEIC M E TDeering Lake-Eckley

23

Employee Replacement Costs  

E-Print Network [OSTI]

Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

Dube, Arindrajit; Freeman, Eric; Reich, Michael

2010-01-01T23:59:59.000Z

24

Dielectric-Lined High-Gradient Accelerator Structure  

SciTech Connect (OSTI)

Rectangular particle accelerator structures with internal planar dielectric elements have been studied, with a view towards devising structures with lower surface fields for a given accelerating field, as compared with structures without dielectrics. Success with this concept is expected to allow operation at higher accelerating gradients than otherwise on account of reduced breakdown probabilities. The project involves studies of RF breakdown on amorphous dielectrics in test cavities that could enable high-gradient structures to be built for a future multi-TeV collider. The aim is to determine what the limits are for RF fields at the surfaces of selected dielectrics, and the resulting acceleration gradient that could be achieved in a working structure. The dielectric of principal interest in this study is artificial CVD diamond, on account of its advertised high breakdown field ({approx}2 GV/m for dc), low loss tangent, and high thermal conductivity. Experimental studies at mm-wavelengths on materials and structures for achieving high acceleration gradient were based on the availability of the 34.3 GHz third-harmonic magnicon amplifier developed by Omega-P, and installed at the Yale University Beam Physics Laboratory. Peak power from the magnicon was measured to be about 20 MW in 0.5 {micro}s pulses, with a gain of 54 dB. Experiments for studying RF high-field effects on CVD diamond samples failed to show any evidence after more than 10{sup 5} RF pulses of RF breakdown up to a tangential surface field strength of 153 MV/m; studies at higher fields were not possible due to a degradation in magnicon performance. A rebuild of the tube is underway at this writing. Computed performance for a dielectric-loaded rectangular accelerator structure (DLA) shows highly competitive properties, as compared with an existing all-metal structure. For example, comparisons were made of a DLA structure having two planar CVD diamond elements with a all-metal CERN structure HDS operating at 30 GHz. It was shown that the ratio of maximum surface electric field to accelerating field at the metal wall is only 0.35-0.4 for DLA, much smaller than the value 2.2 for HDS; and the ratio of surface magnetic field to accelerating field is 3.0 mA/V for DLA, compared with 3.45 mA/V for HDS. These values bode well for DLA in helping to avoid breakdown and to reducing pulsed surface heating and fatigue. The shunt impedance is found to be 160-175 M{Omega}/m for DLA, as compared to 99 M{Omega}/m for HDS. Conclusions are reached from this project that CVD diamond appears promising as a dielectric with a high threshold for RF breakdown, and that rectangular accelerator structures can be devised using planar CVD diamond elements that could be operated at higher acceleration gradients with low probability of RF breakdown, as compared with corresponding all-metallic structures.

Jay L. Hirshfield

2012-04-24T23:59:59.000Z

25

EIS-0159: Flatiron-Erie 115-kV Transmission Line  

Broader source: Energy.gov [DOE]

"The Western Area Power Administration proposes to build 27 new wood H-frame structures along the line, to replace or modify 45 of the existing structures and to remove 11 of them."

26

On the Detectability of the Hydrogen 3-cm Fine Structure Line from the EoR  

E-Print Network [OSTI]

A soft ultraviolet radiation field, 10.2 eV EoR) excites the 2p (directly) and 2s (indirectly) states of atomic hydrogen. Because the 2s state is metastable, the lifetime of atoms in this level is relatively long, which may cause the 2s state to be overpopulated relative to the 2p state. It has recently been proposed that for this reason, neutral intergalactic atomic hydrogen gas may be detected in absorption in its 3-cm fine-structure line (2s_1/2 -> 2p_3/2) against the Cosmic Microwave Background out to very high redshifts. In particular, the optical depth in the fine-structure line through neutral intergalactic gas surrounding bright quasars during the EoR may reach tau~1e-5. The resulting surface brightness temperature of tens of micro K (in absorption) may be detectable with existing radio telescopes. Motivated by this exciting proposal, we perform a detailed analysis of the transfer of Lyman beta,gamma,delta,... radiation, and re-analyze the detectability of the fine-structure line in neutral intergalactic gas surrounding high-redshift quasars. We find that proper radiative transfer modeling causes the fine-structure absorption signature to be reduced tremendously to tauEoR cannot reveal its presence in the 3-cm fine-structure line to existing radio telescopes.

Mark Dijkstra; Adam Lidz; Jonathan R. Pritchard; Lincoln J. Greenhill; D. A. Mitchell; S. M. Ord; Randal B. Wayth

2009-02-25T23:59:59.000Z

27

Generic Design Methodology for Symmetrically Coupled Line Structures Sarmad Al-Taei, Phil Lane, George Passiopoulos  

E-Print Network [OSTI]

Generic Design Methodology for Symmetrically Coupled Line Structures Sarmad Al-Taei, Phil Lane, Surrey, GU15 3DT Abstract: High performance miniaturised and cost effective passive components are needed systems. In recent years there has been increasing interest in utilising passive multi-layer IC

Haddadi, Hamed

28

Zeeman splitting of spectral lines in different structural elements of sunspot umbrae  

SciTech Connect (OSTI)

The fine structure and Zeeman splitting of certain spectral lines in sunspot umbrae are studied. It is shown that unipolar sunspots pass through a stage when their umbrae contain light and dark sections consisting of light and dark fine-structure elements of different brightness, shape, and size. Bright fine-structure elements are concentrated in regions of the umbra lying in front of developing bays of the penumbra. It is found that in these regions of the umbra of a sunspot lying near the center of the solar disk the lambda6302.499 A Fe I and lambda5781.759 A CrI lines show a doublet, and in dark sections of the umbra a triplet pattern of splitting. The magnetic field strength is lower in light sections of an umbra than in dark sections.

Sattarov, I.

1980-05-01T23:59:59.000Z

29

First SNS Target Replacement  

E-Print Network [OSTI]

First SNS Target Replacement Experience M. Dayton, M. Rennich, Van Graves, J. DeVore Presented by T.S. Department of Energy AHIP Workshop Oct. 2009 Overview · Initial Target Replacement · Target Maintenance-Battelle for the U.S. Department of Energy AHIP Workshop Oct. 2009 First SNS Target Replacement · Replacement

McDonald, Kirk

30

The structure and properties of weld lines in injection molded thermoplastics  

E-Print Network [OSTI]

fronts of a polymer melt impinge, an area of different supermolecular structure and proper- ties from the bulk material is formed. These areas are called "weld" or "knit" lines and they are found in almost every injection molded part, especially those... but some distance be- low it. This effect has led a number of investigators (1, 2, 3) to speculate that since the skin material is oriented in the direction of flow and it originally came from the flow front, the weld line is an area where...

Manisali, Ali Ihsan

1980-01-01T23:59:59.000Z

31

Silicon-on-insulator structures formed by a line-source electron beam: Experiment and theory  

SciTech Connect (OSTI)

A line-source electron beam has been used to melt and recrystallize isolated Si layers to form Si-on-insulator structures. Heat flow calculations for these layered structures have been developed which correctly predict the observed recrystallization. Using sample sweep speeds of 100--600 cm/s and peak power densities up to 75 kW/cm/sup 2/ in the 1 x 20-mm beam, we have obtained single-crystal areas as large as 50 x 350 ..mu..m. Seed openings to the substrate are used to control the orientation of the regrowth and the heat flow in the recrystallization film.

Knapp, J.A.

1985-10-01T23:59:59.000Z

32

Minimizing Simultaneous Switching Noise at Reduced Power with Power Transmission Lines for  

E-Print Network [OSTI]

Minimizing Simultaneous Switching Noise at Reduced Power with Power Transmission Lines for High] by replacing the power plane structure with a power transmission line (PTL). In this paper, a new power switching noise; power transmission line I. INTRODUCTION The rapid increase in data rates and transistor

Swaminathan, Madhavan

33

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet AssistanceCatalytic SitesEmployee,Energy

34

Analyzing Replacement Stock Alternatives  

E-Print Network [OSTI]

Replacement management strategy involves comparing the values of the breeding stock you own with the value of potential replacements, and then choosing the investment with the highest expected worth. This publication discusses the application...

Falconer, Lawrence; McGrann, James M.; Parker, John; Jones, Rodney

2008-10-21T23:59:59.000Z

35

All-thin-film multilayered multiferroic structures with a slot-line for spin-electromagnetic wave devices  

SciTech Connect (OSTI)

Spin-electromagnetic waves propagating in thin-film multilayered multiferroic structures containing a slot transmission line have been investigated both experimentally and theoretically. The thin-film structure was composed of a ferrite film, a ferroelectric film, and a slot-line. It was shown that the spectrum of the spin-electromagnetic wave was formed as a result of hybridization of the spin wave in the ferrite film with the electromagnetic wave in the slot-line and was electrically and magnetically tunable. For the experimental investigations, a microwave phase shifter based on the multiferroic structure has been fabricated. Performance characteristics are presented.

Nikitin, Andrey A.; Ustinov, Alexey B. [Department of Physical Electronics and Technology, St. Petersburg Electrotechnical University, St. Petersburg 197376 (Russian Federation); Department of Mathematics and Physics, Lappeenranta University of Technology, Lappeenranta 53850 Finland (Finland); Semenov, Alexander A.; Kalinikos, Boris A. [Department of Physical Electronics and Technology, St. Petersburg Electrotechnical University, St. Petersburg 197376 (Russian Federation); Lähderanta, E. [Department of Mathematics and Physics, Lappeenranta University of Technology, Lappeenranta 53850 Finland (Finland)

2014-03-03T23:59:59.000Z

36

Large Scale Structures a Gradient Lines: the case of the Trkal Flow  

E-Print Network [OSTI]

A specific asymptotic expansion at large Reynolds numbers (R)for the long wavelength perturbation of a non stationary anisotropic helical solution of the force less Navier-Stokes equations (Trkal solutions) is effectively constructed of the Beltrami type terms through multi scaling analysis. The asymptotic procedure is proved to be valid for one specific value of the scaling parameter,namely for the square root of the Reynolds number (R).As a result large scale structures arise as gradient lines of the energy determined by the initial conditions for two anisotropic Beltrami flows of the same helicity.The same intitial conditions determine the boundaries of the vortex-velocity tubes, containing both streamlines and vortex lines

Libin, Alexander S

2010-01-01T23:59:59.000Z

37

Large Scale Structures a Gradient Lines: the case of the Trkal Flow  

E-Print Network [OSTI]

A specific asymptotic expansion at large Reynolds numbers (R)for the long wavelength perturbation of a non stationary anisotropic helical solution of the force less Navier-Stokes equations (Trkal solutions) is effectively constructed of the Beltrami type terms through multi scaling analysis. The asymptotic procedure is proved to be valid for one specific value of the scaling parameter,namely for the square root of the Reynolds number (R).As a result large scale structures arise as gradient lines of the energy determined by the initial conditions for two anisotropic Beltrami flows of the same helicity.The same intitial conditions determine the boundaries of the vortex-velocity tubes, containing both streamlines and vortex lines

Alexander S. Libin

2010-07-13T23:59:59.000Z

38

FAR-INFRARED FINE-STRUCTURE LINE DIAGNOSTICS OF ULTRALUMINOUS INFRARED GALAXIES  

SciTech Connect (OSTI)

We present Herschel observations of 6 fine-structure lines in 25 ultraluminous infrared galaxies at z < 0.27. The lines, [O III]52 ?m, [N III]57 ?m, [O I]63 ?m, [N II]122 ?m, [O I]145 ?m, and [C II]158 ?m, are mostly single Gaussians with widths <600 km s{sup –1} and luminosities of 10{sup 7}-10{sup 9} L{sub ?}. There are deficits in the [O I]63/L{sub IR}, [N II]/L{sub IR}, [O I]145/L{sub IR}, and [C II]/L{sub IR} ratios compared to lower luminosity systems. The majority of the line deficits are consistent with dustier H II regions, but part of the [C II] deficit may arise from an additional mechanism, plausibly charged dust grains. This is consistent with some of the [C II] originating from photodissociation regions or the interstellar medium (ISM). We derive relations between far-IR line luminosities and both the IR luminosity and star formation rate. We find that [N II] and both [O I] lines are good tracers of the IR luminosity and star formation rate. In contrast, [C II] is a poor tracer of the IR luminosity and star formation rate, and does not improve as a tracer of either quantity if the [C II] deficit is accounted for. The continuum luminosity densities also correlate with the IR luminosity and star formation rate. We derive ranges for the gas density and ultraviolet radiation intensity of 10{sup 1} < n < 10{sup 2.5} and 10{sup 2.2} < G{sub 0} < 10{sup 3.6}, respectively. These ranges depend on optical type, the importance of star formation, and merger stage. We do not find relationships between far-IR line properties and several other parameters: active galactic nucleus (AGN) activity, merger stage, mid-IR excitation, and SMBH mass. We conclude that these far-IR lines arise from gas heated by starlight, and that they are not strongly influenced by AGN activity.

Farrah, D.; Petty, S. M.; Harris, K. [Department of Physics, Virginia Tech, Blacksburg, VA 24061 (United States); Lebouteiller, V.; Spoon, H. W. W. [Cornell University, CRSR, Space Sciences Building, Ithaca, NY 14853 (United States); Bernard-Salas, J.; Pearson, C. [Department of Physics and Astronomy, The Open University, Milton Keynes MK7 6AA (United Kingdom); Rigopoulou, D. [RAL Space, Rutherford Appleton Laboratory, Harwell, Oxford OX11 0QX (United Kingdom); Smith, H. A. [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); González-Alfonso, E. [Universidad de Alcalá, Departamento de Física y Matemáticas, Campus Universitario, E-28871 Alcalá de Henares, Madrid (Spain); Clements, D. L. [Physics Department, Imperial College London, Prince Consort Road, London SW7 2AZ (United Kingdom); Efstathiou, A. [School of Sciences, European University Cyprus, Diogenes Street, Engomi, 1516 Nicosia (Cyprus); Cormier, D. [Institut für theoretische Astrophysik, Zentrum für Astronomie der Universität Heidelberg, Albert-Ueberle Str. 2, D-69120 Heidelberg (Germany); Afonso, J. [Centro de Astronomia e Astrofísica da Universidade de Lisboa, Observatório Astronómico de Lisboa, Tapada da Ajuda, 1349-018 Lisbon (Portugal); Hurley, P. [Department of Physics and Astronomy, University of Sussex, Falmer, Brighton BN1 9QH (United Kingdom); Borys, C. [Infrared Processing and Analysis Center, MS220-6, California Institute of Technology, Pasadena, CA 91125 (United States); Verma, A. [Oxford Astrophysics, Denys Wilkinson Building, University of Oxford, Keble Rd, Oxford OX1 3RH (United Kingdom); Cooray, A.; Salvatelli, V. [Department of Physics and Astronomy, University of California, Irvine, CA 92697 (United States)

2013-10-10T23:59:59.000Z

39

Photometrical analysis of the Neck-Line structure of Comet Bennet 1970II  

SciTech Connect (OSTI)

The Kimura and Liu (1977) analysis of the motion in space of cometary dust tail grains, which furnished information on the size-dependence of the dust ejection velocity from the inner coma and the size distribution on a millimetric scale, is presently applied to the Neck-Line Structure (NLS) displayed by Comet Bennett 1970II at the begining of May, 1970. Attention is given to two photographs of the comet which have been analyzed by digital image processing in order to extract reliable photometric data; the strong excess of millimetric grains noted is in agreement with the Fulle (1987) results for preperihelion times. 24 references.

Fulle, M.; Sedmak, G.

1988-06-01T23:59:59.000Z

40

A semi-automatic method for extracting thin line structures in images as rooted tree network  

SciTech Connect (OSTI)

This paper addresses the problem of semi-automatic extraction of line networks in digital images - e.g., road or hydrographic networks in satellite images, blood vessels in medical images, robust. For that purpose, we improve a generic method derived from morphological and hydrological concepts and consisting in minimum cost path estimation and flow simulation. While this approach fully exploits the local contrast and shape of the network, as well as its arborescent nature, we further incorporate local directional information about the structures in the image. Namely, an appropriate anisotropic metric is designed by using both the characteristic features of the target network and the eigen-decomposition of the gradient structure tensor of the image. Following, the geodesic propagation from a given seed with this metric is combined with hydrological operators for overland flow simulation to extract the line network. The algorithm is demonstrated for the extraction of blood vessels in a retina image and of a river network in a satellite image.

Brazzini, Jacopo [Los Alamos National Laboratory; Dillard, Scott [Los Alamos National Laboratory; Soille, Pierre [EC - JRC

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

THE COMPACT RADIO STRUCTURE OF RADIO-LOUD NARROW LINE SEYFERT 1 GALAXIES  

SciTech Connect (OSTI)

We present the compact radio structure of three radio-loud narrow line Seyfert 1 galaxies from the Very Long Baseline Array archive data at 2.3, 5, and 8.4 GHz. In RXS J16290+4007, the radio structure is mostly unresolved. The combination of compact radio structure, high brightness temperature, and inverted spectrum between simultaneous 2.3 and 8.4 GHz strongly favors jet relativistic beaming. Combined with the very long baseline interferometry data at 1.6 and 8.4 GHz from the literature, we argue that RXS J16333+4718 also may harbor a relativistic jet, with resolved core-jet structure in 5 GHz. B3 1702+457 is clearly resolved with a well-defined jet component. The overall radio steep spectrum indicates that B3 1702+457 is likely a source optically defined as NLS1 with radio definition of compact steep spectrum sources. From these three sources, we found that radio loud NLS1s can be either intrinsically radio loud (e.g., B3 1702+457) or apparently radio loud due to jet beaming effects (e.g., RXS J16290+4007 and RXS J16333+4718).

Gu Minfeng; Chen Yongjun, E-mail: gumf@shao.ac.c [Key Laboratory for Research in Galaxies and Cosmology, Shanghai Astronomical Observatory, Chinese Academy of Sciences, 80 Nandan Road, Shanghai 200030 (China)

2010-06-15T23:59:59.000Z

42

Neutron shell structure and deformation in neutron-drip-line nuclei  

E-Print Network [OSTI]

Neutron shell-structure and the resulting possible deformation in the neighborhood of neutron-drip-line nuclei are systematically discussed, based on both bound and resonant neutron one-particle energies obtained from spherical and deformed Woods-Saxon potentials. Due to the unique behavior of weakly-bound and resonant neutron one-particle levels with smaller orbital angular-momenta $\\ell$, a systematic change of the shell structure and thereby the change of neutron magic-numbers are pointed out, compared with those of stable nuclei expected from the conventional j-j shell-model. For spherical shape with the operator of the spin-orbit potential conventionally used, the $\\ell_{j}$ levels belonging to a given oscillator major shell with parallel spin- and orbital-angular-momenta tend to gather together in the energetically lower half of the major shell, while those levels with anti-parallel spin- and orbital-angular-momenta gather in the upper half. The tendency leads to a unique shell structure and possible deformation when neutrons start to occupy the orbits in the lower half of the major shell. Among others, the neutron magic-number N=28 disappears and N=50 may disappear, while the magic number N=82 may presumably survive due to the large $\\ell =5$ spin-orbit splitting for the $1h_{11/2}$ orbit. On the other hand, an appreciable amount of energy gap may appear at N=16 and 40 for spherical shape, while neutron-drip-line nuclei in the region of neutron number above N=20, 40 and 82, namely N $\\approx$ 21-28, N $\\approx$ 41-54, and N $\\approx$ 83-90, may be quadrupole-deformed though the possible deformation depends also on the proton number of respective nuclei.

Ikuko Hamamoto

2012-06-18T23:59:59.000Z

43

Radiation Source Replacement Workshop  

SciTech Connect (OSTI)

This report summarizes a Radiation Source Replacement Workshop in Houston Texas on October 27-28, 2010, which provided a forum for industry and researchers to exchange information and to discuss the issues relating to replacement of AmBe, and potentially other isotope sources used in well logging.

Griffin, Jeffrey W.; Moran, Traci L.; Bond, Leonard J.

2010-12-01T23:59:59.000Z

44

Diploma Replacement Order diploma-replace 1/12  

E-Print Network [OSTI]

Diploma Replacement Order diploma-replace 1/12 A replacement diploma may be ordered in the event of loss of or damage to the original diploma. Replacement diplomas are 17Ã? 14 ("mini" diplomas or letter-sized diplomas are no longer available). The replacement diploma fee is $50, payable by check or credit card

Shamos, Michael I.

45

Video face replacement  

E-Print Network [OSTI]

We present a method for replacing facial performances in video. Our approach accounts for differences in identity, visual appearance, speech, and timing between source and target videos. Unlike prior work, it does not ...

Dale, Kevin

46

ON THE ANTI-CORRELATION BETWEEN SPECTRAL LINE BROADENING AND INTENSITY IN CORONAL STRUCTURES OBSERVED WITH EIS  

SciTech Connect (OSTI)

The advance in spectral resolution of the Extreme Ultraviolet Imaging (EIS) spectrometer on board Hinode has allowed for more detailed analysis of coronal spectral lines. Large line broadening and blueshifted velocities have been found in the periphery of active region (AR) cores and near the footpoints of coronal loops. This line broadening is yet to be understood. We study the correlation of intensity and line width for entire ARs and sub-regions selected to include coronal features. The results show that although a slight positive correlation can be found when considering whole images, many sub-regions have a negative correlation between intensity and line width. Sections of a coronal loop display some of the largest anti-correlations found for this study with the increased line broadening occurring directly adjacent to the footpoint section of the loop structure, not at the footpoint itself. The broadened lines may be due to a second Doppler-shifted component that is separate from the main emitting feature such as a coronal loop, but related in their excitation. The small size of these features forces the considerations of investigator and instrumental effects. Preliminary analyses are shown that indicate the possibility of a point-spread function that is not azimuthally symmetric and may affect velocity and line profile measurements.

Scott, J. T.; Martens, P. C. H. [Deptartment of Physics, Montana State University, Bozeman, MT 59717 (United States)

2011-12-01T23:59:59.000Z

47

REQUEST FOR REPLACEMENT DIPLOMA Name: ________________________________________________________________________  

E-Print Network [OSTI]

REQUEST FOR REPLACEMENT DIPLOMA Name. ________________________________________________________________________ First Middle Maiden Last REPLACEMENT DIPLOMA INFORMATION Please print your name exactly as you want it to appear on your replacement diploma. If your name has changed since your degree was awarded, and if you

Gering, Jon C.

48

How to identify the structure of near-threshold states from the line shape  

E-Print Network [OSTI]

We revisit the compositeness theorem proposed by Weinberg in an effective field theory (EFT) and explore criteria which are sensitive to the structure of $S$-wave threshold states. On a general basis, we show that the wave function renormalization constant $Z$, which is the probability of finding an elementary component in the wave function of a threshold state, can be explicitly introduced in the description of the threshold state. As an application of this EFT method, we describe the near-threshold line shape of the $D^{\\ast 0}\\bar D^0$ invariant mass spectrum in $B\\rightarrow D^{\\ast 0}\\bar D^0 K$ and determine a nonvanishing value of $Z$. It suggests that the $X(3872)$ as a candidate of the $D^{\\ast 0}\\bar D^0$ molecule may still contain a small $c\\bar{c}$ core. This elementary component, on the one hand, explains its production in the $B$ meson decay via a short-distance mechanism, and on the other hand, is correlated with the $D^{\\ast 0}\\bar D^0$ threshold enhancement observed in the $D^{\\ast 0}\\bar D^0$ invariant mass distributions. Meanwhile, we also show that if $Z$ is non-zero, the near-threshold enhancement of the $D^{\\ast 0}\\bar D^0$ mass spectrum in the $B$ decay will be driven by the short-distance production mechanism. This conclusion is still true even if the long-distance production is enhanced by some unexpected mechanism.

Guo-Ying Chen; Wen-Sheng Huo; Qiang Zhao

2014-10-29T23:59:59.000Z

49

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...  

Broader source: Energy.gov (indexed) [DOE]

Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

50

Three-dimensional simulations of the orientation and structure of reconnection X-lines  

SciTech Connect (OSTI)

This letter employs Hall magnetohydrodynamic simulations to study X-lines formed during the reconnection of magnetic fields with differing strengths and orientations embedded in plasmas of differing densities. Although random initial perturbations trigger the growth of X-lines with many orientations, a few robust X-lines sharing an orientation consistent with the direction of maximal outflow speed, as predicted by Swisdak and Drake [Geophys. Res. Lett. 34, L11106 (2007)] eventually dominate the system. Reconnection in the geometry examined here contradicts the suggestion of Sonnerup [J. Geophys. Res. 79, 1546 (1974)] that it occurs in a plane normal to the equilibrium current. At late time, the X-lines' growth stagnates, leaving them shorter than the simulation domain.

Schreier, R.; Swisdak, M.; Drake, J. F. [Institute for Research in Electronics and Applied Physics, University of Maryland, College Park, Maryland 20742-3511 (United States); Cassak, P. A. [Department of Physics, West Virginia University, Morgantown, West Virginia 26506 (United States)

2010-11-15T23:59:59.000Z

51

Replace / Renewal BUDGET ZZ106  

E-Print Network [OSTI]

Replace / Renewal BUDGET ZZ106 FUND: 126 CERTIFIED FOOD MANAGER CERTIFICATE RENEWAL Certificate Replacement Reason for Application: Replacement $15.00 Certificate Renewal Reason for Application: [Renewal application may be submitted up to 60 days prior to expiration.] Renewal - $10.00 Please Note: All

52

Enzyme replacement therapy for Pompe disease  

E-Print Network [OSTI]

CALIFORNIA, SAN DIEGO Enzyme Replacement Therapy for Pompe3 1.3 Enzyme Replacement Therapy for Pompe Disease…………………… 5Receptor ERT – Enzyme Replacement Therapy LSD – Lysosomal

Burris, Ryan Jonathan William

2010-01-01T23:59:59.000Z

53

Polarization of absorption lines as a diagnostics of circumstellar, interstellar and intergalactic magnetic fields: Fine structure atoms  

E-Print Network [OSTI]

The relative population of the fine structure sublevels of an atom's ground state is affected by radiative transitions induced by an anisotropic radiation flux. This causes the alignment of atomic angular momentum. In terms of observational consequences for the interstellar and intergalactic medium, this results in the polarization of the absorption lines. In the paper we consider the conditions necessary for this effect and provide calculations of polarization from a few astrophysically important atoms and ions with multiple upper and lower levels for an arbitrary orientation of magnetic fields to the a) source of optical pumping, b) direction of observation, c) absorbed source. We also consider an astrophysically important ``degenerate'' case when the source of optical pumping coincides with the source of the absorbed radiation. We present analytical expressions that relate the degree of linear polarization and the intensity of absorption to the 3D orientation of the magnetic field with respect to the pumping source, the source of the absorbed radiation, and the direction of observations. We discuss how all these parameters can be determined via simultaneous observations of several absorption lines and suggest graphical means that are helpful in practical data interpretation. We prove that studies of absorption line polarization provide a unique tool to study 3D magnetic field topology in various astrophysical conditions.

Huirong Yan; A. Lazarian

2006-11-09T23:59:59.000Z

54

Window Replacement, Rehabilitation, & Repair Guides - Building...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Window Replacement, Rehabilitation, & Repair Guides - Building America Top Innovation Effec...

55

Systematic structure of the neutron drip-line {sup 22}C nucleus  

SciTech Connect (OSTI)

In the present work we systematically discuss the nuclear structure of the the heaviest particle-bound carbon isotope, {sup 22}C. The ground state wave function of the carbon isotope is calculated using the {sup 20}C core plus two-valence neutron based on a phenomenological mean-field MF potential. We apply the deduced wave function to provide the nuclear matter density which is necessary in the calculations of the total reaction cross section. Calculations show that there is a reasonable good description of the experimental binding energy BE and root-mean square RMS radius. The exotic structure and configuration of the ground state carbon isotope is explained and a consistent explanation on the two-neutron halo (Borromean) nucleus is given.

Ismail, Atef [Fundamental and Applied Sciences Department, Universiti Teknologi Petronas, Bandar Seri Iskandar, 31750 Tronoh, Perak, Malaysia and Department of Physics, Al-Azhar University, 71524 Assiut (Egypt); Cheong, Lee Yen; Yahya, Noorhana [Fundamental and Applied Sciences Department, Universiti Teknologi PETRONAS, Bandar Seri Iskandar, 31750 Tronoh, Perak (Malaysia); Tammam, M. [Department of Physics, Al-Azhar University, 71524 Assiut (Egypt)

2014-10-24T23:59:59.000Z

56

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

57

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

Not Available

1994-02-01T23:59:59.000Z

58

Suppression of fine-structure splitting and oscillator strength of sodium D-line in a Debye plasma  

SciTech Connect (OSTI)

We investigate theoretically the influence of static plasma screening on relativistic spin-orbit interaction-induced fine-structure splitting of the D-line doublet arising from the transitions 3p{sub 1/2}–3s{sub 1/2} and 3p{sub 3/2}–3s{sub 1/2} of the valence electron of a sodium atom embedded in a model plasma environment. The many-electron atomic problem is formulated first as an effective one-electron problem in which the interaction between the optically active valence electron and the atomic ion core is represented by an accurate parametric model potential including core-polarization correction, and then the plasma effect on the atomic system is simulated by the Debye-screening model for the valence-core interaction. It is observed that the magnitude of spin-orbit energy shift reduces for both the upper component 3p{sub 3/2} and the lower component 3p{sub 1/2} with increasing plasma screening strength, thereby reducing the spin-orbit energy separation between these two components as the screening becomes stronger. As a consequence, the magnitude of fine-structure splitting between the D{sub 1} and D{sub 2} line energies of sodium drops significantly with stronger plasma screening. The optical (absorption) oscillator strength for 3s ? 3p transition is seen to reduce with stronger screening and this leads to a screening-induced gradual suppression of the 3p ? 3s spontaneous decay rate.

Basu, Joyee, E-mail: joyeebasu@yahoo.com; Ray, Debasis, E-mail: ray.debasis@gmail.com [Department of Physics, Bengal Engineering and Science University, Shibpur, Howrah, West Bengal 711 103 (India)] [Department of Physics, Bengal Engineering and Science University, Shibpur, Howrah, West Bengal 711 103 (India)

2014-01-15T23:59:59.000Z

59

Energy Replacement Generation Tax Exemption  

Broader source: Energy.gov [DOE]

Iowa imposes a replacement generation tax of 0.06 cents ($0.0006) per kilowatt-hour (kWh) on various forms of electricity generated within the state. This tax is imposed in lieu of a property tax...

60

Virent is Replacing Crude Oil  

Broader source: Energy.gov [DOE]

Breakout Session 2A—Conversion Technologies II: Bio-Oils, Sugar Intermediates, Precursors, Distributed Models, and Refinery Co-Processing Virent is Replacing Crude Oil Randy Cortright, Founder & Chief Technology Officer, Virent

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

NACS Voice Mail Replacement Project  

E-Print Network [OSTI]

NACS Voice Mail Replacement Project Presented to the TPAG Monday, November 13, 2006 #12 criteria Integration with email is a key factor Taking a second look at Cisco & AVST Cost of Interactive

Brody, James P.

62

Buying Vs. Raising Replacement Heifers  

E-Print Network [OSTI]

When deciding on the best strategy for replacing heifers, beef cattle producers should weigh several factors. This publication discusses several such issues, including current and future market prices; herd size; pastures, facilities and management...

Cleere, Jason

2006-01-02T23:59:59.000Z

63

Anytime Replanning Using Local Subplan Replacement  

E-Print Network [OSTI]

Anytime Replanning Using Local Subplan Replacement A Dissertation Presented to the faculty how local subplan replacement can be utilized to implement an anytime planning system that devises new plans to accommodate plan failures. Local subplan replacement consists of selecting subsequences

Ferrer, Gabriel J.

64

New line classifications in Ho I based on high-precision hyperfine-structure measurement of low levels  

SciTech Connect (OSTI)

Doppler-free laser-fluorescence and laser-rf double-resonance studies have been made of the hyperfine structure (hfs) of four strong, previously unclassified visible lines in Ho I; all are shown to connect with low levels. The hfs of the 4f/sup 11/6s/sup 2/ /sup 4/I/sub 11/2,9/2/ levels is measured in detail, allowing evaluation of the dipole (a/sup 01/, a/sup 12/, a/sup 10/) and quadrupole (b/sup 02/,b/sup 11/,b/sup 13/) hfs radial integrals. The results are in close agreement with the ab initio values of Lindgren and Rosen (Case Stud. Atom. Phys. 4, 93--292 (1974). The value found for b/sup 02/ in the 4f/sup 11/6s/sup 2/ configuration is in reasonable agreement with that of Wyart and Camus (Physica 93C, 227-236 (1978)), thereby confirming their finding of a substantial dependence of this parameter on the number of 4f electrons in the core.

Childs, W.J.; Cok, D.R.; Goodman, L.S.

1983-02-01T23:59:59.000Z

65

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

Not Available

1993-12-01T23:59:59.000Z

66

Stanford University Mercury Thermometer Replacement  

E-Print Network [OSTI]

Stanford University Mercury Thermometer Replacement Program Instructions for Reuniting Separated Fluid Column of Non-Mercury Thermometer Heating Method Heat the thermometers bulb in an upright position of the thermometer. Note that over filling the expansion chamber will break the thermometer. Tap the thermometer

67

REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni  

E-Print Network [OSTI]

REPLACEMENT DIPLOMA REQUEST FORM Dear Alumni: It is our understanding that you need to replace your original diploma. We are glad to help you attain a replacement diploma. The items listed below are required replacement diploma. Please feel free to contact the LGBT Center at 617-627-3770 if you have questions

Dennett, Daniel

68

Equatorial scattering and the structure of the broad-line region in Seyfert nuclei: evidence for a rotating disc  

E-Print Network [OSTI]

We present detailed scattering models confirming that distinctive variations in polarization across the broad Halpha line, which are observed in a significant fraction of Seyfert 1 galaxies, can be understood in terms of a rotating line-emitting disc surrounded by a co-planar scattering region (the equatorial scattering region). The predicted polarization properties are: averaged over wavelength, the position angle of polarization is aligned with the projected disc rotation axis and hence also with the radio source axis; (ii) the polarization PA rotates across the line profile, reaching equal but opposite (relative to the continuum PA) rotations in the blue and red wings; (iii) the degree of polarization peaks in the line wings and passes through a minimum in the line core. We identify 11 objects which exhibit these features to different degrees. In order to reproduce the large amplitude PA rotations observed in some cases, the scattering region must closely surround the emission disc and the latter must itself be a relatively narrow annulus -- presumably the Halpha-emitting zone of a larger accretion disc. Asymmetries in the polarization spectra may be attributable to several possible causes, including bulk radial infall in the equatorial scattering region, or contamination by polar scattered light. The broad Halpha lines do not, in general, exhibit double-peaked profiles, suggesting that a second Halpha-emitting component of the broad-line region is present, in addition to the disc.

J. E. Smith; A. Robinson; S. Young; D. J. Axon; Elizabeth A. Corbett

2005-01-28T23:59:59.000Z

69

MID-INFRARED ATOMIC FINE-STRUCTURE EMISSION-LINE SPECTRA OF LUMINOUS INFRARED GALAXIES: SPITZER/IRS SPECTRA OF THE GOALS SAMPLE  

SciTech Connect (OSTI)

We present the data and our analysis of mid-infrared atomic fine-structure emission lines detected in Spitzer/Infrared Spectrograph high-resolution spectra of 202 local Luminous Infrared Galaxies (LIRGs) observed as part of the Great Observatories All-sky LIRG Survey (GOALS). We readily detect emission lines of [S IV], [Ne II], [Ne V], [Ne III], [S III]{sub 18.7{sub ?m}}, [O IV], [Fe II], [S III]{sub 33.5{sub ?m}}, and [Si II]. More than 75% of these galaxies are classified as starburst-dominated sources in the mid-infrared, based on the [Ne V]/[Ne II] line flux ratios and equivalent width of the 6.2 ?m polycyclic aromatic hydrocarbon feature. We compare ratios of the emission-line fluxes to those predicted from stellar photo-ionization and shock-ionization models to constrain the physical and chemical properties of the gas in the starburst LIRG nuclei. Comparing the [S IV]/[Ne II] and [Ne III]/[Ne II] line ratios to the Starburst99-Mappings III models with an instantaneous burst history, the emission-line ratios suggest that the nuclear starbursts in our LIRGs have ages of 1-4.5 Myr, metallicities of 1-2 Z{sub ?}, and ionization parameters of 2-8 × 10{sup 7} cm s{sup –1}. Based on the [S III]{sub 33.5{sub ?m}}/[S III]{sub 18.7{sub ?m}} ratios, the electron density in LIRG nuclei is typically one to a few hundred cm{sup –3}, with a median electron density of ?300 cm{sup –3}, for those sources above the low density limit for these lines. We also find that strong shocks are likely present in 10 starburst-dominated sources of our sample. A significant fraction of the GOALS sources (80) have resolved neon emission-line profiles (FWHM ?600 km s{sup –1}) and five show clear differences in the velocities of the [Ne III] or [Ne V] emission lines, relative to [Ne II], of more than 200 km s{sup –1}. Furthermore, six starburst and five active galactic nucleus dominated LIRGs show a clear trend of increasing line width with ionization potential, suggesting the possibility of a compact energy source and stratified interstellar medium in their nuclei. We confirm a strong correlation between the sum of the [Ne II]{sub 12.8{sub ?m}} and [Ne III]{sub 15.5{sub ?m}} emission, as well as [S III]{sub 33.5{sub ?m}}, with both the infrared luminosity and the 24 ?m warm dust emission measured from the spectra, consistent with all three lines tracing ongoing star formation. Finally, we find no correlation between the hardness of the radiation field or the emission-line width and the ratio of the total infrared to 8 ?m emission (IR8), a measure of the strength of the starburst and the distance of the LIRGs from the star-forming main sequence. This may be a function of the fact that the infrared luminosity and the mid-infrared fine-structure lines are sensitive to different timescales over the starburst, or that IR8 is more sensitive to the geometry of the region emitting the warm dust than the radiation field producing the H II region emission.

Inami, H. [National Optical Astronomy Observatory, Tucson, AZ 85719 (United States); Armus, L.; Stierwalt, S.; Díaz-Santos, T.; Surace, J.; Howell, J.; Marshall, J. [Spitzer Science Center, California Institute of Technology, CA 91125 (United States); Charmandaris, V. [Department of Physics and Institute of Theoretical and Computational Physics, University of Crete, GR-71003 Heraklion (Greece); Groves, B. [Max Planck Institute for Astronomy, Königstuhl 17, D-69117 Heidelberg (Germany); Kewley, L. [Research School of Astronomy and Astrophysics, The Australian National University, Cotter Road, Weston Creek, ACT 2611 (Australia); Petric, A. [Department of Astronomy, California Institute of Technology, MS 320-47, Pasadena, CA 91125 (United States); Rich, J. [The Observatories, Carnegie Institute of Washington, 813 Santa Barbara Street, Pasadena, CA 91101 (United States); Haan, S. [CSIRO Astronomy and Space Science, Marsfield, NSW 2122 (Australia); Evans, A. S. [Department of Astronomy, University of Virginia, P.O. Box 400325, Charlottesville, VA 22904 (United States); Mazzarella, J.; Lord, S. [Infrared Processing and Analysis Center, MS 100-22, California Institute of Technology, Pasadena, CA 91125 (United States); Appleton, P. [NASA Herschel Science Center, 770 South Wilson Avenue, Pasadena, CA 91125 (United States); Spoon, H. [Astronomy Department, Cornell University, Ithaca, NY 14853 (United States); Frayer, D. [National Radio Astronomy Observatory, P.O. Box 2, Green Bank, WV 24944 (United States); Matsuhara, H., E-mail: inami@noao.edu [Institute of Space and Astronautical Science, Japan Aerospace Exploration Agency (Japan); and others

2013-11-10T23:59:59.000Z

70

Kittiwakes strategically reduce investment in replacement clutches  

E-Print Network [OSTI]

Kittiwakes strategically reduce investment in replacement clutches Julien Gasparini1,*, Alexandre). In birds, egg production is lower in replacement clutches than in first clutches, but it is unknown whether the replacement clutch is produced) or from a strategic allocation of resources between the two breeding attempts

Alvarez, Nadir

71

General Adaptive Replacement Policies Yannis Smaragdakis  

E-Print Network [OSTI]

General Adaptive Replacement Policies Yannis Smaragdakis College of Computing Georgia Institute of Technology yannis@cc.gatech.edu ABSTRACT We propose a general scheme for creating adaptive replace- ment any two existing replacement policies so that the resulting policy provably can never perform worse

Smaragdakis, Yannis

72

Cooperative Determination on Cache Replacement Candidates  

E-Print Network [OSTI]

Cooperative Determination on Cache Replacement Candidates for Transcoding Proxy Caching Keqiu Li1- mination on cache replacement candidates for transcoding proxies. An original model which determines cache replacement candidates on all can- didate nodes in a coordinated fashion with the objective of minimizing

Chin, Francis Y.L.

73

Replacement Diploma Request University of Massachusetts Lowell  

E-Print Network [OSTI]

Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 883. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

Massachusetts at Lowell, University of

74

Cache Replacement Policy Revisited Mohamed Zahran  

E-Print Network [OSTI]

Cache Replacement Policy Revisited Mohamed Zahran Electrical Engineering Department City University of New York mzahran@ccny.cuny.edu Abstract Cache replacement policy is a major design parameter of any memory hierarchy. The efficiency of the replace- ment policy affects both the hit rate and the access la

Zahran, Mohamed M.

75

Article ID #eqr106 REPLACEMENT STRATEGIES  

E-Print Network [OSTI]

Article ID #eqr106 REPLACEMENT STRATEGIES Elmira Popova Associate Professor, Department)-296-5795 e-mail: popovai@seattleu.edu Corresponding Contributor: Elmira Popova Keywords: Replacement Policies define what is a replacement policy for a system that fails randomly in time and its main characteristics

Popova, Elmira

76

Replacement Diploma Request University of Massachusetts Lowell  

E-Print Network [OSTI]

Replacement Diploma Request Mail to: University of Massachusetts Lowell Office of the Registrar 220. * Please use a separate form for each diploma request. * All replacement diplomas are University of Massachusetts Lowell diplomas. Replacement diplomas with the name of any predecessor institution

Massachusetts at Lowell, University of

77

Type-Logical Hyperedge Replacement Grammars  

E-Print Network [OSTI]

Type-Logical and Hyperedge Replacement Grammars Draft Richard Moot LaBRI (CNRS), INRIA Bordeaux SW2009 #12;CONTENTS 1 Introduction 1 2 Hyperedge Replacement Grammars 3 2.1 Hypergraphs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2.2 Hyperedge Replacement . . . . . . . . . . . . . . . . . . . . . . . 4 2.3 Hyperedge

Paris-Sud XI, Université de

78

PeopleAdmin Staff Straight Replacement  

E-Print Network [OSTI]

1 PeopleAdmin ­ Staff Straight Replacement Guide #12;2 The staff straight replacement module will be used by hiring managers to request vacant, benefited positions be advertisedAdmin system, you will see this view. To begin the staff straight replacement process, you should click BEGIN

Hutcheon, James M.

79

THE STRUCTURE OF THE BROAD-LINE REGION IN ACTIVE GALACTIC NUCLEI. I. RECONSTRUCTED VELOCITY-DELAY MAPS  

SciTech Connect (OSTI)

We present velocity-resolved reverberation results for five active galactic nuclei. We recovered velocity-delay maps using the maximum entropy method for four objects: Mrk 335, Mrk 1501, 3C 120, and PG 2130+099. For the fifth, Mrk 6, we were only able to measure mean time delays in different velocity bins of the H{beta} emission line. The four velocity-delay maps show unique dynamical signatures for each object. For 3C 120, the Balmer lines show kinematic signatures consistent with both an inclined disk and infalling gas, but the He II {lambda}4686 emission line is suggestive only of inflow. The Balmer lines in Mrk 335, Mrk 1501, and PG 2130+099 show signs of infalling gas, but the He II emission in Mrk 335 is consistent with an inclined disk. We also see tentative evidence of combined virial motion and infalling gas from the velocity-binned analysis of Mrk 6. The maps for 3C 120 and Mrk 335 are two of the most clearly defined velocity-delay maps to date. These maps constitute a large increase in the number of objects for which we have resolved velocity-delay maps and provide evidence supporting the reliability of reverberation-based black hole mass measurements.

Grier, C. J.; Peterson, B. M.; Pogge, R. W.; De Rosa, G.; Martini, Paul; Kochanek, C. S.; Zu, Y.; Shappee, B.; Beatty, T. G.; Salvo, C. Araya; Bird, J. C. [Department of Astronomy, The Ohio State University, 140 W 18th Ave, Columbus, OH 43210 (United States)] [Department of Astronomy, The Ohio State University, 140 W 18th Ave, Columbus, OH 43210 (United States); Horne, Keith [SUPA Physics and Astronomy, University of St. Andrews, Fife, KY16 9SS Scotland (United Kingdom)] [SUPA Physics and Astronomy, University of St. Andrews, Fife, KY16 9SS Scotland (United Kingdom); Bentz, M. C. [Department of Physics and Astronomy, Georgia State University, Astronomy Offices, One Park Place South SE, Suite 700, Atlanta, GA 30303 (United States)] [Department of Physics and Astronomy, Georgia State University, Astronomy Offices, One Park Place South SE, Suite 700, Atlanta, GA 30303 (United States); Denney, K. D. [Marie Curie Fellow at the Dark Cosmology Centre, Niels Bohr Institute, University of Copenhagen, Juliane Maries Vej 30, DK-2100 Copenhagen (Denmark)] [Marie Curie Fellow at the Dark Cosmology Centre, Niels Bohr Institute, University of Copenhagen, Juliane Maries Vej 30, DK-2100 Copenhagen (Denmark); Siverd, R. [Department of Physics and Astronomy, Vanderbilt University, 5301 Stevenson Center, Nashville, TN 37235 (United States)] [Department of Physics and Astronomy, Vanderbilt University, 5301 Stevenson Center, Nashville, TN 37235 (United States); Sergeev, S. G.; Borman, G. A. [Crimean Astrophysical Observatory, P/O Nauchny Crimea 98409 (Ukraine)] [Crimean Astrophysical Observatory, P/O Nauchny Crimea 98409 (Ukraine); Kaspi, S. [School of Physics and Astronomy, Raymond and Beverly Sackler Faculty of Exact Sciences, Tel Aviv University, Tel Aviv 69978 (Israel)] [School of Physics and Astronomy, Raymond and Beverly Sackler Faculty of Exact Sciences, Tel Aviv University, Tel Aviv 69978 (Israel); Bord, D. J. [Department of Natural Sciences, The University of Michigan - Dearborn, 4901 Evergreen Rd, Dearborn, MI 48128 (United States)] [Department of Natural Sciences, The University of Michigan - Dearborn, 4901 Evergreen Rd, Dearborn, MI 48128 (United States); Che, X. [Department of Astronomy, University of Michigan, 500 Church Street, Ann Arbor, MI 41809 (United States)] [Department of Astronomy, University of Michigan, 500 Church Street, Ann Arbor, MI 41809 (United States); and others

2013-02-10T23:59:59.000Z

80

Improving NMR Protein Structure Quality by Rosetta Refinement...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NMR Protein Structure Quality by Rosetta Refinement: A Molecular Replacement Study. Improving NMR Protein Structure Quality by Rosetta Refinement: A Molecular Replacement Study....

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

82

Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions  

E-Print Network [OSTI]

Amendment 80 vessel replacement 1 Implementation and of Amendment 80 Vessel Replacement Provisions vessels to use non-qualifying vessels in the sector, thus allowing replacement of a lost qualifying vessel of the CRP ambiguous as to whether replacement of qualifying vessels with non-qualifying vessels

83

New energy replacement method for resonant power supplies  

SciTech Connect (OSTI)

The Resonant Power Supply is an economically and technically advanced solution for Rapid Cycling Accelerators. Several papers dealt with the design and operation of these power supplies, however, the energy replacement methods were not discussed in the past. This paper analyzes different energy-replacement methods and presents a new method. This method uses a 24-pulse converter to regulate the magnet current during flat-top and injection periods and replaces the energy loss by charging the accelerator capacitor bank during the flat-top, reset and injection periods, charge is injected in the circuit during the acceleration period, when it replaces the energy loss. This paper compares the new method with the existing ones. The analyses proved the feasibility of the proposed method. The operation of the proposed method was verified by a model experiment, which showed that the new circuit can be controlled accurately and operates with smaller disturbances to the power line than the existing systems. 2 refs., 6 figs., 1 tab.

Karady, G.G.; Thiessen, H.A.

1989-01-01T23:59:59.000Z

84

The Herschel Comprehensive (U)LIRG Emission Survey (HerCULES): CO Ladders, fine structure lines, and neutral gas cooling  

E-Print Network [OSTI]

(Ultra) Luminous Infrared Galaxies ((U)LIRGs) are objects characterized by their extreme infrared (8-1000 $\\mu$m) luminosities ($L_{LIRG}>10^{11} $L$_\\odot$ and $L_{ULIRG}>10^{12}$ L$_\\odot$). The Herschel Comprehensive ULIRG Emission Survey (HerCULES; PI van der Werf) presents a representative flux-limited sample of 29 (U)LIRGs that spans the full luminosity range of these objects (10$^{11}\\leq L_\\odot \\geq10^{13}$). With the \\emph{Herschel Space Observatory}, we observe [CII] 157 $\\mu$m, [OI] 63 $\\mu$m, and [OI] 145 $\\mu$m line emission with PACS, CO J=4-3 through J=13-12, [CI] 370 $\\mu$m, and [CI] 609 $\\mu$m with SPIRE, and low-J CO transitions with ground-based telescopes. The CO ladders of the sample are separated into three classes based on their excitation level. In 13 of the galaxies, the [OI] 63 $\\mu$m emission line is self absorbed. Comparing the CO excitation to the IRAS 60/100 $\\mu$m ratio and to far infrared luminosity, we find that the CO excitation is more correlated to the far infrared colors....

Rosenberg, M J F; Aalto, S; Armus, L; Charmandaris, V; Díaz-Santos, T; Evans, A S; Fischer, J; Gao, Y; González-Alfonso, E; Greve, T R; Harris, A I; Henkel, C; Israel, F P; Isaak, K G; Kramer, C; Meijerink, R; Naylor, D A; Sanders, D B; Smith, H A; Spaans, M; Spinoglio, L; Stacey, G J; Veenendaal, I; Veilleux, S; Walter, F; Weiß, A; Wiedner, M C; van der Wiel, M H D; Xilouris, E M

2015-01-01T23:59:59.000Z

85

EUV SPECTRAL LINE FORMATION AND THE TEMPERATURE STRUCTURE OF ACTIVE REGION FAN LOOPS: OBSERVATIONS WITH HINODE/EIS AND SDO/AIA  

SciTech Connect (OSTI)

With the aim of studying active region fan loops using observations from the Hinode EUV Imaging Spectrometer (EIS) and Solar Dynamics Observatory Atmospheric Imaging Assembly (AIA), we investigate a number of inconsistencies in modeling the absolute intensities of Fe VIII and Si VII lines, and address why spectroheliograms formed from these lines look very similar despite the fact that ionization equilibrium calculations suggest that they have significantly different formation temperatures: log(T{sub e} /K) = 5.6 and 5.8, respectively. It is important to resolve these issues because confidence has been undermined in their use for differential emission measure (DEM) analysis, and Fe VIII is the main contributor to the AIA 131 A channel at low temperatures. Furthermore, the strong Fe VIII 185.213 A and Si VII 275.368 A lines are the best EIS lines to use for velocity studies in the transition region, and for assigning the correct temperature to velocity measurements in the fans. We find that the Fe VIII 185.213 A line is particularly sensitive to the slope of the DEM, leading to disproportionate changes in its effective formation temperature. If the DEM has a steep gradient in the log(T{sub e} /K) = 5.6-5.8 temperature range, or is strongly peaked, Fe VIII 185.213 A and Si VII 275.368 A will be formed at the same temperature. We show that this effect explains the similarity of these images in the fans. Furthermore, we show that the most recent ionization balance compilations resolve the discrepancies in absolute intensities. With these difficulties overcome, we combine EIS and AIA data to determine the temperature structure of a number of fan loops and find that they have peak temperatures of 0.8-1.2 MK. The EIS data indicate that the temperature distribution has a finite (but narrow) width < log ({sigma}{sub Te}/K) = 5.5 which, in one detailed case, is found to broaden substantially toward the loop base. AIA and EIS yield similar results on the temperature, emission measure magnitude, and thermal distribution in the fans, though sometimes the AIA data suggest a relatively larger thermal width. The result is that both the Fe VIII 185.213 A and Si VII 275.368 A lines are formed at log(T{sub e} /K){approx} 5.9 in the fans, and the AIA 131 A response also shifts to this temperature.

Brooks, David H.; Young, Peter R. [College of Science, George Mason University, 4400 University Drive, Fairfax, VA 22020 (United States); Warren, Harry P., E-mail: dhbrooks@ssd5.nrl.navy.mil [Space Science Division, Naval Research Laboratory, Washington, DC 20375 (United States)

2011-04-01T23:59:59.000Z

86

LED Replacements for Linear Fluorescent Lamps Webcast  

Broader source: Energy.gov [DOE]

In this June 20, 2011 webcast on LED products marketed as replacements for linear fluorescent lamps, Jason Tuenge of the Pacific Northwest National Laboratory (PNNL) discussed current Lighting...

87

Optimal scheduling for replacing perimeter guarding unmanned ...  

E-Print Network [OSTI]

difference between charging batteries, automatically replacing batteries [11] or ... the discussion below to the use of batteries and battery charge, without loss of ...

2014-08-20T23:59:59.000Z

88

STUDIES OF NGC 6720 WITH CALIBRATED HST/WFC3 EMISSION-LINE FILTER IMAGES. I. STRUCTURE AND EVOLUTION ,  

SciTech Connect (OSTI)

We have performed a detailed analysis of the Ring Nebula (NGC 6720) using Hubble Space Telescope WFC3 images and derived a new three-dimensional model. Existing high spectral resolution spectra played an important supplementary role in our modeling. It is shown that the Main Ring of the nebula is an ionization-bounded irregular non-symmetric disk with a central cavity and perpendicular extended lobes pointed almost toward the observer. The faint outer halos are determined to be fossil radiation, i.e., radiation from gas ionized in an earlier stage of the nebula when it was not ionization bounded. The narrowband WFC3 filters that isolate some of the emission lines are affected by broadening on their short wavelength side and all the filters were calibrated using ground-based spectra. The filter calibration results are presented in an appendix.

O'Dell, C. R. [Department of Physics and Astronomy, Vanderbilt University, Box 1807-B, Nashville, TN 37235 (United States); Ferland, G. J. [Department of Physics and Astronomy, University of Kentucky, Lexington, KY 40506 (United States); Henney, W. J. [Centro de Radioastronomia y Astrofisica, Universidad Nacional Autonoma de Mexico, Apartado Postal 3-72, 58090 Morelia, Michaoacan (Mexico); Peimbert, M., E-mail: cr.odell@vanderbilt.edu [Instituto de Astronomia, Universidad Nacional Autonoma de Mexico, Apdo, Postal 70-264, 04510 Mexico D. F. (Mexico)

2013-04-15T23:59:59.000Z

89

Charge line quad pulser  

DOE Patents [OSTI]

A quartet of parallel coupled planar triodes is removably mounted in a quadrahedron shaped PCB structure. Releasable brackets and flexible means attached to each triode socket make triode cathode and grid contact with respective conductive coatings on the PCB and a detachable cylindrical conductive element enclosing and contacting the triode anodes jointly permit quick and easy replacement of faulty triodes. By such orientation, the quad pulser can convert a relatively low and broad pulse into a very high and narrow pulse. 16 figs.

Booth, R.

1996-10-08T23:59:59.000Z

90

Charge line quad pulser  

DOE Patents [OSTI]

A quartet of parallel coupled planar triodes is removably mounted in a quadrahedron shaped PCB structure. Releasable brackets and flexible means attached to each triode socket make triode cathode and grid contact with respective conductive coatings on the PCB and a detachable cylindrical conductive element enclosing and contacting the triode anodes jointly permit quick and easy replacement of faulty triodes. By such orientation, the quad pulser can convert a relatively low and broad pulse into a very high and narrow pulse.

Booth, Rex (Livermore, CA)

1996-01-01T23:59:59.000Z

91

Microsoft Word - CX-Satsop-Aberdeen_Tower-Replacement_FY10_WEB...  

Broader source: Energy.gov (indexed) [DOE]

2, 2010 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Replacement of twenty 22-L structures on the...

92

Vehicle Technologies and Bus Fleet Replacement Optimization  

E-Print Network [OSTI]

1 Vehicle Technologies and Bus Fleet Replacement Optimization: problem properties and sensitivity: R41 #12;2 Abstract This research presents a bus fleet replacement optimization model to analyze hybrid and conventional diesel vehicles, are studied. Key variables affecting optimal bus type

Bertini, Robert L.

93

Page Replacement Algorithms To use a simulation for evaluating various page replacement algorithms studied in class.  

E-Print Network [OSTI]

Operating Systems CSI3131 Lab 4 Winter 2011 Page Replacement Algorithms Objective To use a simulation for evaluating various page replacement algorithms studied in class. Description (Please read to compare the performance of each page replacement algorithm. The constructor of this class contains

Stojmenovic, Ivan

94

Electrostatic solitary structures in presence of non-thermal electrons and a warm electron beam on the auroral field lines  

SciTech Connect (OSTI)

Electrostatic solitary waves (ESWs) have been observed by satellites in the auroral region of the Earth's magnetosphere. These ESWs are found to be having both positive and negative electrostatic potentials. Using the Sagdeeev psuedo-potential technique, arbitrary amplitude electron-acoustic solitary waves/double layers are studied in an unmagnetized plasma consisting of non-thermally distributed hot electrons, fluid cold electrons, a warm electron beam, and ions. The inertia of the warm electrons, and not the beam speed, is essential for the existence of positive potential solitary structures. Existence domains for positive as well as negative potential electrostatic solitons/double layers are obtained. For the typical auroral region parameters, the electric field amplitude of the negative potential solitons is found to be in the range {approx}(3-30) mV/m and {approx}(5-80) mV/m for the positive potential solitons. For the negative potential solitons/double layers, the amplitudes are higher when their widths are smaller. On the other hand, the amplitude of the positive potential structures increase with their widths.

Singh, S. V. [Indian Institute of Geomagnetism, Navi Mumbai (India); School of Physics, University of Kwazulu-Natal, Durban (South Africa); Lakhina, G. S. [Indian Institute of Geomagnetism, Navi Mumbai (India); Bharuthram, R. [University of the Western Cape, Bellville (South Africa); Pillay, S. R. [School of Physics, University of Kwazulu-Natal, Durban (South Africa)

2011-12-15T23:59:59.000Z

95

Replacement solvents for use in chemical synthesis  

DOE Patents [OSTI]

Replacement solvents for use in chemical synthesis include polymer-immobilized solvents having a flexible polymer backbone and a plurality of pendant groups attached onto the polymer backbone, the pendant groups comprising a flexible linking unit bound to the polymer backbone and to a terminal solvating moiety. The polymer-immobilized solvent may be dissolved in a benign medium. Replacement solvents for chemical reactions for which tetrahydrofuran or diethyl may be a solvent include substituted tetrahydrofurfuryl ethers and substituted tetrahydro-3-furan ethers. The replacement solvents may be readily recovered from the reaction train using conventional methods.

Molnar, Linda K. (Philadelphia, PA); Hatton, T. Alan (Sudbury, MA); Buchwald, Stephen L. (Newton, MA)

2001-05-15T23:59:59.000Z

96

Organic agriculture cannot replace conventional agriculture  

E-Print Network [OSTI]

Organic agriculture cannot replace conventional agriculture Sina Adl , David Iron and Theodore Agriculture | Pathogen Dispersal Introduction Organic farming [1, 2] is gaining in popularity in Eu- rope, because or- ganic agriculture avoids using environmentally harmful chem- icals that pollute soil

Kolokolnikov, Theodore

97

Marin County- Wood Stove Replacement Rebate Program  

Broader source: Energy.gov [DOE]

The County of Marin has created a rebate program to encourage homeowners to remove or replace non-EPA certified wood-burning heaters (wood stoves and fireplace inserts) with cleaner burning stoves...

98

Beyond the Replacement Paradigm: Smart Lighting  

E-Print Network [OSTI]

Switches · Smart Building & Grid Interfaces · Efficient full spectrum LEDs without droop · Versatile, low - Visible Light Communications Integration of smart fixtures, networked sensors and control systemsBeyond the Replacement Paradigm: Smart Lighting Robert F. Karlicek, Jr. Director, Smart Lighting

Salama, Khaled

99

Evaluation of alternative sign replacement strategies  

E-Print Network [OSTI]

replacement procedure at the time the new standards go into effect. This will ensure that material, manpower, and other expenditures are minimized, resulting in an overall benefit to TXDOT. Based on this review and analysis, it is recommended that TXDOT...

McCaleb, James Bradley

1996-01-01T23:59:59.000Z

100

Coherent soliton communication lines  

SciTech Connect (OSTI)

The data transmission in coherent fiber-optical communication lines using solitons with a variable phase is studied. It is shown that nonlinear coherent structures (solitons) can be applied for effective signal transmission over a long distance using amplitude and optical-phase keying of information. The optimum ratio of the pulse width to the bit slot at which the spectral efficiency (transmitted bits per second and hertz) is maximal is determined. It is shown that soliton fiber-optical communication lines can ensure data transmission at a higher spectral efficiency as compared to traditional communication lines and at a high signal-to-noise ratio.

Yushko, O. V., E-mail: olesya.yushko@gmail.com; Redyuk, A. A.; Fedoruk, M. P.; Turitsyn, S. K. [Novosibirsk State University (Russian Federation)

2014-11-15T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

A replaceable reflective film for solar concentrators  

SciTech Connect (OSTI)

The 3M Company manufactures a silvered acrylic film called ECP-305 that is regarded as the preferred reflective film for use on stretched-membrane heliostats. However, ECP-305 will degrade in time, due to both corrosion of the silver layer and delamination at the film's silver-to-acrylic interface, and will eventually need to be replaced. 3M uses a very aggressive adhesive on this film, and once it is laminated, replacement is very difficult. The purpose of this investigation was the development of a replaceable reflector, a reflective film that can be easily removed and replaced. A replaceable reflector was successfully configured by laminating ECP-305 to the top surface of a smooth, dimensionally stable polymer film, with a removable adhesive applied to the underside of the polymer film. Several stages of screening and testing led to the selection of a 0.010-inch thick polycarbonate (GE 8030) as the best polymer film and a medium tack tape (3M Y-9425) was selected as the best removable adhesive. To demonstrate the feasibility of the replaceable reflector concept and to provide a real-time field test, the chosen construction was successfully applied to the 50-m{sup 2} SKI heliostat at the Central Receiver Test Facility at Sandia National Laboratories in Albuquerque. 4 refs., 13 figs., 7 tabs.

Not Available

1991-09-01T23:59:59.000Z

102

VERY LONG BASELINE ARRAY IMAGING OF PARSEC-SCALE JET STRUCTURES IN RADIO-LOUD NARROW-LINE SEYFERT 1 GALAXIES  

SciTech Connect (OSTI)

We conducted very long baseline interferometry observations of five radio-loud narrow-line Seyfert 1 (NLS1) galaxies in milliarcsecond resolutions at 1.7 GHz ({lambda}18 cm) using the Very Long Baseline Array. Significant parsec (pc) scale structures were revealed for three out of the five sources with high brightness temperature by direct imaging; this is convincing evidence for nonthermal jets. FBQS J1644+2619 with an inverted spectrum showed a prominent one-sided linear structure, indicating Doppler beaming with an intrinsic jet speed of >0.74c. FBQS J1629+4007, also with an inverted spectrum, showed rapid flux variability, indicating Doppler beaming with an intrinsic jet speed of >0.88c. Thus, we found convincing evidence that these two NLS1s can generate at least mildly or highly relativistic jets, which may make them apparently radio loud even if they are intrinsically radio quiet. On the other hand, the other three NLS1s had steep spectra and two of them showed significantly diffuse pc-scale structures, which were unlikely to be strongly beamed. Thus, some NLS1s have the ability to generate jets strong enough to make them intrinsically radio loud without Doppler beaming. NLS1s as a class show a number of extreme properties and radio-loud ones are very rare. We build on these radio results to understand that the central engines of radio-loud NLS1s are essentially the same as that of other radio-loud active galactic nuclei in terms of the formation of nonthermal jets.

Doi, Akihiro [Institute of Space and Astronautical Science, Japan Aerospace Exploration Agency, 3-1-1 Yoshinodai, Chuou-ku, Sagamihara, Kanagawa 252-5210 (Japan); Asada, Keiichi [Academia Sinica Institute of Astronomy and Astrophysics, P.O. Box 23-141, Taipei 10617, Taiwan (China); Nagai, Hiroshi [National Astronomical Observatory of Japan, 2-21-1 Osawa, Mitaka, Tokyo 181-8588 (Japan)

2011-09-10T23:59:59.000Z

103

LONG TERM FILE MIGRATION - PART II: FILE REPLACEMENT ALGORITHMS  

E-Print Network [OSTI]

MIGRATION· PART II: FILE REPLACEMENT ALGORITHMS Alan Jaymay vary even though replacement fi~~d the pa~ameter value PIe N - P ;, RT I r:. fILE REPLACEMENT ALGORITHMS. I.lan ~1ar

Jay Smith, Alan

2011-01-01T23:59:59.000Z

104

REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student Number: _________________________  

E-Print Network [OSTI]

REPLACEMENT/STALE DATED CHEQUE REQUEST FORM Date: ____________________________ Student: _________________________ Cheque Date: _____________________ CHEQUE AMOUNT: ________________________ REASON FOR REPLACEMENT Building at the address below. Please indicate how you would like to receive your replacement cheque

Sinnamon, Gordon J.

105

Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars  

E-Print Network [OSTI]

Lambek Grammars, Tree Adjoining Grammars and Hyperedge Replacement Grammars Richard Moot La (tree generating) hyperedge replacement grammars as an intermediate step. As a consequence both, using hyperedge replacement grammars as an intermediate step. 2 Tree Adjoining Grammars and Hyperedge

Paris-Sud XI, Université de

106

Quenching and Partitioning Process Development to Replace Hot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Quenching and Partitioning Process Development to Replace Hot Stamping of...

107

Magnesium Replacement of Aluminum Cast Components in a Production...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Magnesium Replacement of Aluminum Cast Components in a Production V6 Engine to Effect Cost-Effective Mass Reduction Magnesium Replacement of Aluminum Cast Components in a...

108

Effects of an Accelerated Diesel Engine Replacement/Retrofit Program  

E-Print Network [OSTI]

No. 894 Effects of an Accelerated Diesel Engine Replacement/2009 Effects of an Accelerated Diesel Engine Replacement/reductions occurring on an accelerated schedule compared to

Millstein, Dev E.; Harley, Robert A

2009-01-01T23:59:59.000Z

109

Avoiding a Train Wreck: Replacing Old Coal Plants with Energy...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 Avoiding a Train Wreck: Replacing Old Coal Plants with Energy Efficiency, August 2011 This...

110

Valve assembly having remotely replaceable bearings  

DOE Patents [OSTI]

A valve assembly having remotely replaceable bearings is disclosed wherein a valve disc is supported within a flow duct for rotation about a pair of axially aligned bearings, one of which is carried by a spindle received within a diametral bore in the valve disc, and the other of which is carried by a bearing support block releasably mounted on the duct circumferentially of an annular collar on the valve disc coaxial with its diametrical bore. The spindle and bearing support block are adapted for remote removal to facilitate servicing or replacement of the valve disc support bearings.

Johnson, Evan R. (San Diego, CA); Tanner, David E. (Poway, CA)

1980-01-01T23:59:59.000Z

111

The Ringhals 2 steam generator replacement  

SciTech Connect (OSTI)

Righals 2, located on the west coast of Sweden and operated by Vattenfall (Swedish State Power), is a Westinghouse 800-MW three-loop pressurized water reactor that started commercial operation in 1975. In 1983, a task force was assigned to make a study of the steam generator (SG) tube corrosion problems, mainly stress corrosion cracking in the tubesheet area, which caused between two and three unscheduled outages each year. The task force study concluded that replacement was clearly the best of the three alternatives considered. Late in 1984, a decision was made to replace the SG in the summer of 1989. It was also decided to take advantage of existing margins in the plant by increasing the heat transfer area of the new SG. A power increase of 9% would then be possible by fairly moderate modifications of the turbine plant. The SG replacement project was on time, below budget, and much below dose budget. As a consequence of the 9% uprating, the cost of the SG replacement will be recovered after 3 to 4 yr.

Looft, H.

1990-06-01T23:59:59.000Z

112

Measure Guideline: Window Repair, Rehabilitation, and Replacement  

SciTech Connect (OSTI)

This measure guideline provides information and guidance on rehabilitating, retrofitting, and replacing existing window assemblies in residential construction. The intent is to provide information regarding means and methods to improve the energy and comfort performance of existing wood window assemblies in a way that takes into consideration component durability, in-service operation, and long term performance of the strategies.

Baker, P.

2012-12-01T23:59:59.000Z

113

Reversing Wolbachia-based population replacement  

E-Print Network [OSTI]

Wolbachia bacteria as a vehicle for population replace- ment. Also discussed are strategies strategies and provide mechan- isms for the autonomous spread of desired transgenes into the targeted relative to the natural population [15­17]. Primary candidates for gene-drive strategies are autonomous

Dobson, Stephen L.

114

REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK!  

E-Print Network [OSTI]

REPLACE YOUR MERCURY THERMOMETERS BEFORE THEY BREAK! Did you know, mercury from broken thermometers to the local environment, if broken thermometers in sinks eventually end at the sanitary sewer plant. Broken mercury thermometers create hazardous waste that is costly to clean up and costly to dispose of. Other

115

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

116

THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES  

E-Print Network [OSTI]

THE GROWTH OF LIMITS OF VERTEX REPLACEMENT RULES JOSEPH PREVITE, MICHELLE PREVITE, AND MARY a vertex replacement rule given by exactly one replacement graph generates an infinite graph for the growth degree of infinite graphs with polynomial growth that are gener- ated by vertex replacement rules

Previte, Joseph P.

117

Orthopaedic Surgery Center of Joint Preservation and Replacement  

E-Print Network [OSTI]

Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Hip Replacement new hip! You are going home after a successful total hip replacement. Although there is still much. The benefits of a total hip replacement are great, but they do take a while to be realized. Hip Precautions

Oliver, Douglas L.

118

Orthopaedic Surgery Center of Joint Preservation and Replacement  

E-Print Network [OSTI]

Orthopaedic Surgery Center of Joint Preservation and Replacement After Total Knee Replacement are going home after a successful total knee replacement. Although there is still much work to do, we have replacement are great, but they do take a while to be realized. We have put together some helpful hints

Oliver, Douglas L.

119

Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered...  

Energy Savers [EERE]

Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems Arizona: Solar Panels Replace Inefficient Fossil Fuel-Powered Energy Systems May 1, 2014 - 9:33am...

120

Electrical Equipment Replacement: Energy Efficiency versus System Compatibility  

E-Print Network [OSTI]

end users to select the most energy efficient equipment when replacing motors, motor drives, transformers, lamps, ballasts, etc., given costs associated with energy consumption when compared with installation. The selection of replacement parts...

Massey, G. W.

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Replaces DOE F 5120.2  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement of50.2700.2

122

Replacing PG and E's Milpitas terminal  

SciTech Connect (OSTI)

This paper reports that Pacific Gas and Electric Co.'s Milpitas Terminal was originally built in 1929, when natural gas was first brought to the San Francisco Bay Area from the Kettleman Hills gas fields. This paper reports that in 1985, a project was begun to replace the old terminal due to maintenance problems, odor complaints and unaccounted-for gas due to poor measurement quality. The location of the terminal was also a problem. A proposed highway expansion would encroach into the yard area where the existing pipeline was located. In addition, the original location was in agricultural lands, which was changing to commercial use.

Rawcliffe, R.S.; Maceyka, R.A. (Pacific Gas and Electric Co., San Francisco, CA (US))

1991-07-01T23:59:59.000Z

123

Text-Alternative Version: LED Replacements for Linear Fluorescent Lamps  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the "LED Replacements for Linear Fluorescent Lamps" webcast, held June 20, 2011.

124

The opportunistic replacement problem: analysis and case studies  

E-Print Network [OSTI]

Jan 22, 2009 ... Abstract: We consider an optimization model for determining optimal opportunistic maintenance (that is, component replacement) schedules ...

Torgny Almgren

2009-01-22T23:59:59.000Z

125

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

126

Computer Replacement Guidelines Environmental Health and Safety, Stanford University  

E-Print Network [OSTI]

Computer Replacement Guidelines Environmental Health and Safety, Stanford University 17 November 2005 This document describes the guidelines for replacing laptop and desktop computers at Environmental Health and Safety. PC laptop and desktop computers will be replaced a) on an ongoing basis where

127

Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1  

E-Print Network [OSTI]

Inference of Edge Replacement Graph Grammars Jacek P. Kukluk1 , Lawrence B. Holder2 , and Diane J@eecs.wsu.edu Abstract We describe an algorithm and experiments for inference of edge replacement graph grammars for inference of Node Replacement Recursive Graph Grammars [7]. In this paper we describe an approach

Holder, Lawrence B.

128

FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL  

E-Print Network [OSTI]

1 FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; 2 L'ECUYER, MARTIN, AND V ' AZQUEZ

L'Ecuyer, Pierre

129

1 INTRODUCTION The replacement investment decision is clearly a  

E-Print Network [OSTI]

1 INTRODUCTION The replacement investment decision is clearly a strategic objective of a company for the replacement decision largely depends on the company context. However, we can summarize the motivations leading over time and prove that the replacement policy at equal intervals is optimum. However, the linear

Paris-Sud XI, Université de

130

Application for Amendment 80 Vessel Replacement Page 1 of 6  

E-Print Network [OSTI]

Application for Amendment 80 Vessel Replacement Page 1 of 6 Revised: 12/23/2013 OMB Control No. 0648-0565 Expiration Date: 01/31/2016 APPLICATION FOR AMENDMENT 80 VESSEL REPLACEMENT United States OF THE AMENDMENT 80 VESSEL BEING REPLACED 1. Vessel Name: 2. ADF&G Vessel Registration No.: 3. USCG Documentation

131

Page Replacement and Reference Bit Emulation in Mach  

E-Print Network [OSTI]

Page Replacement and Reference Bit Emulation in Mach Richard P. Draves rpd@cs.cmu.edu School of Computer Science Carnegie Mellon University 5000 Forbes Avenue Pittsburgh, PA 15213 Abstract A page­replacement in software. This paper describes the Mach kernel's page­replacement algorithm and considers three software

132

The Cosmic Origins Spectrograph: A Hubble Replacement Instrument  

E-Print Network [OSTI]

The Cosmic Origins Spectrograph: A Hubble Replacement Instrument for the 2002 Reservicing Mission Origins Spectrograph (COS) has recently been selected as a replacement instrument for the Hubble Space Telescope. Installation is scheduled for late 2002, replacing COSTAR, which at that time will be unnecessary

Colorado at Boulder, University of

133

Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY  

E-Print Network [OSTI]

Diploma Replacement Request FOR REGISTRAR'S OFFICE USE ONLY Updated: 08/26/09 Use this form to request a replacement or additional diploma. · The name on your diploma must be the same the Registrar's Office, Registration and Records Division prior to requesting your replacement diploma

Feschotte, Cedric

134

Cache Replacement Policy Using Map-based Adaptive Insertion  

E-Print Network [OSTI]

Cache Replacement Policy Using Map-based Adaptive Insertion Yasuo Ishii The University of Tokyo insertion policy (MAIP) for a novel cache replacement. The MAIP estimates the data reuse possibility policy. 1. INTRODUCTION The cache replacement policy plays an important role in improving system

Paris-Sud XI, Université de

135

University of Utah Payroll Department Stop Payment -Replacement Form  

E-Print Network [OSTI]

University of Utah Payroll Department Stop Payment - Replacement Form Affidavit to request replacement of a lost, stolen, or damaged, payroll check. Please note that it takes 5 to 7 days to process is given to induce a replacement check for one originally issued. 3. I agree to indemnify and hold

Provancher, William

136

FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL  

E-Print Network [OSTI]

FUNCTIONAL ESTIMATION FOR A MULTICOMPONENT AGE REPLACEMENT MODEL Pierre L'Ecuyer, Benoit Martin, controlled by a replacement rule based on age thresholds. We show how to estimate the expected cost­ generative simulation, maintenance models, age replacement policies. #12; L'ECUYER, MARTIN, AND V ' AZQUEZ

Vázquez-Abad, Felisa J.

137

Node discovery and replacement using mobile Kalypso Magklara1  

E-Print Network [OSTI]

Node discovery and replacement using mobile robot Kalypso Magklara1 , Dimitrios Zorbas1 and Tahiry, that discovers the nodes around it and replaces the active nodes, whose energy is drained, by fully charged and that decide, which nodes to replace. We simulate our algorithms and our findings show that all nodes that fail

Paris-Sud XI, Université de

138

REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE  

E-Print Network [OSTI]

REPLACEMENT DIPLOMA ORDER FORM BOISE STATE REGISTRAR'S OFFICE Administration Building, Room 110-3169 The replacement diploma will bear the signatures of the current University President and Registrar and have the words Replacement Diploma printed under the university seal. Allow 3-4 weeks for delivery. You

Barrash, Warren

139

IIR algorithms for adaptive line enhancement  

SciTech Connect (OSTI)

We introduce a simple IIR structure for the adaptive line enhancer. Two algorithms based on gradient-search techniques are presented for adapting the structure. Results from experiments which utilized real data as well as computer simulations are provided.

David, R.A.; Stearns, S.D.; Elliott, G.R.; Etter, D.M.

1983-01-01T23:59:59.000Z

140

Application for Replacement JCU Award (Certificate/Testamur) -FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD  

E-Print Network [OSTI]

Application for Replacement JCU Award (Certificate/Testamur) - FM-EX-VApr2012 REQUEST FOR REPLACEMENT JCU AWARD (CERTIFICATE/TESTAMUR) 1. PERSONAL DETAILS JCU Student Number (8 digits): Title: rDr r after the fee is paid. · Replacement Testamurs - $70 (Diploma, Bachelor, Master and Doctoral

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

142

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect (OSTI)

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

143

Origin of periodic domain structure in Er{sup 3+}-doped beta'-(Sm,Gd){sub 2}(MoO{sub 4}){sub 3} crystal lines patterned by laser irradiations in glasses  

SciTech Connect (OSTI)

Er{sup 3+}-doped beta'-(Sm,Gd){sub 2}(MoO{sub 4}){sub 3} crystal lines are patterned on the surface of Er{sub 2}O{sub 3}-Gd{sub 2}O{sub 3}-Sm{sub 2}O{sub 3}-MoO{sub 3}-B{sub 2}O{sub 3} glasses by continuous-wave Yb:YVO{sub 4} laser irradiations (wavelength: 1080 nm, power: 1.3 W, scanning speeds: 5 {mu}m/s), and the origin of the periodicity of self-organized domain structures with high and low refractive index regions in crystal lines is examined from polarized optical microscope (POM) observations, micro-Raman scattering spectrum, and photoluminescence spectrum measurements. It is found that the periodicity of domain structures changes largely depending on Er{sub 2}O{sub 3} content, i.e., the length of high (bright color in POM observations) and low (dark color) refractive index regions increases with increasing Er{sub 2}O{sub 3} content and homogeneous crystal lines with no periodic domain structures are patterned in Er{sub 2}O{sub 3}-Sm{sub 2}O{sub 3}-MoO{sub 3}-B{sub 2}O{sub 3} glass with no Gd{sub 2}O{sub 3}. Considering that the degree of ferroelasticities in beta'-(Sm,Gd){sub 2}(MoO{sub 4}){sub 3} crystals decreases due to the incorporation of Er{sup 3+} ions, it is demonstrated that the origin of periodic domain structures in laser-patterned lines is due to spontaneous strains in ferroelastic beta'-(Sm,Gd){sub 2}(MoO{sub 4}){sub 3} crystals. - Graphical abstract: This figure shows the polarized optical photographs (top view) for the lines patterned by laser irradiations with the power of P=1.3 W and the scanning speed of S=5 {mu}m/s in xEr{sub 2}O{sub 3}-(18.25-x)Gd{sub 2}O{sub 3}-3Sm{sub 2}O{sub 3}-63.75MoO{sub 3}-15B{sub 2}O{sub 3} (mol%) glasses. This figure indicates that the periodicity of domain structures in beta'-(Sm,Gd){sub 2}(MoO{sub 4}){sub 3} crystal lines, i.e., the lengths of bright (high refractive index) and dark (low refractive index) color regions, changes depending on the amount of Er{sub 2}O{sub 3} addition. It is demonstrated that the origin of the periodicity of domain structures is due to spontaneous strains in ferroelastic beta'-(Sm,Gd){sub 2}(MoO{sub 4}){sub 3} crystals.

Suzuki, Futoshi; Honma, Tsuyoshi [Department of Materials Science and Technology, Nagaoka University of Technology, 1603-1 Kamitomioka-cho, Nagaoka 940-2188 (Japan); Komatsu, Takayuki, E-mail: komatsu@mst.nagaokaut.ac.j [Department of Materials Science and Technology, Nagaoka University of Technology, 1603-1 Kamitomioka-cho, Nagaoka 940-2188 (Japan)

2010-04-15T23:59:59.000Z

144

Application Form for Replacement Diploma/Program Certificate (Form must be notarized)  

E-Print Network [OSTI]

Application Form for Replacement Diploma/Program Certificate (Form must be notarized) Complete to Princeton University as follows: Replacement Diploma - $75 Replacement Program Certificate - $30 Please

145

An optimal replacement problem in aluminum production  

E-Print Network [OSTI]

The aluminum production facility operated by ALCOA in Rockdale, Texas produces aluminum in a continuous manufacturing environment using steel carbon-lined smelting pots. As a result of the production process of running electricity through an electrolytic... technique known as dynamic programming, the minimum expected cost can be determined for a finite horizon Markov decision problem. This was accomplished using value iteration, a computer program written in C language, and data obtained from ALCOA...

Spanks, Lisa Marie

1992-01-01T23:59:59.000Z

146

Blythe-Knob 161-kV Transmission Line Cross Arm Replacements -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareers Apply forBiosurveillance A8 Blythe-Knob 161-kV9

147

Replacement of the Advanced Test Reactor control room  

SciTech Connect (OSTI)

The control room for the Advanced Test Reactor has been replaced to provide modern equipment utilizing current standards and meeting the current human factors requirements. The control room was designed in the early 1960 era and had not been significantly upgraded since the initial installation. The replacement did not change any of the safety circuits or equipment but did result in replacement of some of the recorders that display information from the safety systems. The replacement was completed in concert with the replacement of the control room simulator which provided important feedback on the design. The design successfully incorporates computer-based systems into the display of the plant variables. This improved design provides the operator with more information in a more usable form than was provided by the original design. The replacement was successfully completed within the scheduled time thereby minimizing the down time for the reactor. 1 fig., 1 tab.

Durney, J.L.; Klingler, W.B. (EG and G Idaho, Inc., Idaho Falls, ID (USA))

1989-01-01T23:59:59.000Z

148

arthroplasty replacement: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Replacement of the target module was accomplished using only remote handling tooling and procedures (hands meter of high density concrete The Target Service Bay is...

149

androgen replacement therapy: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 153 LATTICE PATHS, SAMPLING...

150

arthroplasty replacement hip: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

gains, replacement components are typically more energy efficient than older equipment. Life cycle cost analyses encourage... Massey, G. W. 2005-01-01 144 LATTICE PATHS, SAMPLING...

151

Heavy-Duty Natural Gas Drayage Truck Replacement Program  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Heavy-Duty Natural Gas Drayage Truck Replacement Program Principal Investigator: Vicki White South Coast Air Quality Management District May 16, 2012 Project ID ARRAVT045 This...

152

New Feedstocks and Replacement Fuels - Future Energy for Mobility...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuels - Future Energy for Mobility New Feedstocks and Replacement Fuels - Future Energy for Mobility Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan....

153

New Feedstocks and Replacement Fuel Diesel Engine Challenges...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Diesel Engine Challenges New Feedstocks and Replacement Fuel Diesel Engine Challenges Presentation given at DEER 2006, August 20-24, 2006, Detroit, Michigan. Sponsored by the...

154

Quenching and Partitioning Process Development to Replace Hot...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Quenching and Partitioning Process ADVANCED MANUFACTURING OFFICE Quenching and Partitioning Process Development to Replace Hot Stamping of High-Strength Automotive Steel Novel...

155

FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART 1.  

E-Print Network [OSTI]

FORMATION OF REPLACEMENT DOLOMITE IN THE LATEMAR CARBONATE BUILDUP, DOLOMITES, NORTHERN ITALY: PART F. McDONOUGH*** ABSTRACT. Replacement dolomite in the Latemar carbonate buildup, northern Italy of vertical columns (replacement of limestone breccia pipes) and sheets (replacement along fractures

Carmichael, Sarah

156

Rocket borne solar eclipse experiment to measure the temperature structure of the solar corona via lyman-. cap alpha. line profile observations  

SciTech Connect (OSTI)

A rocket borne experiment to measure the temperature structure of the inner solar corona via the doppler broadening of the resonance hydrogen Lyman-..cap alpha.. (lambda1216A) radiation scattered by ambient neutral hydrogen atoms was attempted during the 16 Feb 1980 solar eclipse. Two Nike-Black Brant V sounding rockets carrying instrumented payloads were launched into the path of the advancing eclipse umbra from the San Marco satellite launch platform 3 miles off the east coast of Kenya.

Argo, H.V.

1981-01-01T23:59:59.000Z

157

Nuclear structure beyond the neutron drip line: the lowest energy states in $^9$He via their T=5/2 isobaric analogs in $^9$Li  

E-Print Network [OSTI]

The level structure of the very neutron rich and unbound $^9$He nucleus has been the subject of significant experimental and theoretical study. Many recent works have claimed that the two lowest energy $^9$He states exist with spins $J^\\pi=1/2^+$ and $J^\\pi=1/2^-$ and widths on the order of hundreds of keV. These findings cannot be reconciled with our contemporary understanding of nuclear structure. The present work is the first high-resolution study with low statistical uncertainty of the relevant excitation energy range in the $^8$He$+n$ system, performed via a search for the T=5/2 isobaric analog states in $^9$Li populated through $^8$He+p elastic scattering. The present data show no indication of any narrow structures. Instead, we find evidence for a broad $J^{\\pi}=1/2^+$ state in $^9$He located approximately 3 MeV above the neutron decay threshold.

Uberseder, E; Goldberg, V Z; Koshchiy, E; Roeder, B T; Alcorta, M; Chubarian, G; Davids, B; Fu, C; Hooker, J; Jayatissa, H; Melconian, D; Tribble, R E

2015-01-01T23:59:59.000Z

158

Conveyorized Photoresist Stripping Replacement for Flex Circuit Fabrication  

SciTech Connect (OSTI)

A replacement conveyorized photoresist stripping system was characterized to replace the ASI photoresist stripping system. This system uses the qualified ADF-25c chemistry for the fabrication of flex circuits, while the ASI uses the qualified potassium hydroxide chemistry. The stripping process removes photoresist, which is used to protect the copper traces being formed during the etch process.

Megan Donahue

2009-02-24T23:59:59.000Z

159

CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING  

E-Print Network [OSTI]

CONSTRUCTION BY REPLACEMENT: A NEW APPROACH TO SIMULATION MODELING Authors: · James H Hines (MIT changes are needed. The paper describes an extensive experiment with using this approach to construct with another molecule. Using this tool kit, users can rapidly construct new simulation models by replacing

160

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS  

E-Print Network [OSTI]

RELIABILITY OF SAMPLING INSPECTION SCHEMES APPLIED TO REPLACEMENT STEAM GENERATORS Guy Roussel the size of the random sample of tubes to be inspected in replacement steam generators is revisited in this paper. A procedure to estimate the maximum number of defective tubes left in the steam generator after

Cizelj, Leon

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Reference: RGL 83-09 Subject: POWER TRANSMISSION LINES  

E-Print Network [OSTI]

Reference: RGL 83-09 Subject: POWER TRANSMISSION LINES Title: MARKING OF AERIAL POWER TRANSMISSION. 1. The marking of aerial power transmission lines, cables, and structures over the navigable waters LINES, CABLES, & STRUCTURES Issued: 07/13/83 Expires: 12/31/85 Originator: DAEN-CWO-N Description: ARMY

US Army Corps of Engineers

162

New approach for modelling distributed MEMS transmission lines  

E-Print Network [OSTI]

New approach for modelling distributed MEMS transmission lines K. Topalli, M. Unlu, S. Demir, O for the distributed MEMS transmission line (DMTL) structures. In this new model, the MEMS bridges that are used as the loading elements of the DMTL structures are represented as low-impedance transmission lines, rather than

Akin, Tayfun

163

System and process for ultrasonic characterization of deformed structures  

DOE Patents [OSTI]

Generally speaking, the method of the present invention is performed by making various ultrasonic scans at preselected orientations along the length of a material being tested. Data from the scans are then plotted together with various calculated parameters that are calculated from this data. Lines or curves are then fitted to the respective plotted points. Review of these plotted curves allows the location and severity of defects within these sections to be determined and quantified. With this information various other decisions related to how, when or whether repair or replacement of a particular portion of a structure can be made.

Panetta, Paul D. (Williamsburg, VA); Morra, Marino (Richland, WA); Johnson, Kenneth I. (Richland, WA)

2011-11-22T23:59:59.000Z

164

Analytical protostellar disk models 1: the effect of internal dissipation and surface irradiation on the structure of disks and the location of the snow line around Sun-like stars  

E-Print Network [OSTI]

We construct a new set of self-consistent analytical disk models by taking into account both viscous and radiative sources of thermal energy. We analyze the non-isothermal structure of the disk across the mid-plane for optically thick disks, and use the standard two-temperature model in the case of optically thin disks. We deduce a set of general formula for the relationship between the mass accretion rate and the surface density profile. Our results recover those of Chiang & Goldreich in the optically thin regions, but extend their work for the opaque regions of the disk. For the purpose of illustration, we apply our theory in this paper to determine the structure of protostellar disks around T Tauri stars under a state of steady accretion and derive the corresponding radial distribution function of various disk properties such as surface density and temperature near the mid-plane. We calculate the position of the snow line around a sun-like T Tauri star, and deduce that it can evolve from well outside 10 AU during FU Orionis outbursts, to about 4 AU during passive accretion phase, to the present-day orbital radius of Venus and finally re-expand to over 2.2 AU during the protostellar- to-debris disk transition. This non-monotonous evolution of the snow line may provide some novel and deterministic explanation for the total water content and its isotopic composition of both Venus and the Earth. In the optically thin, outermost regions of the disk we find that the surface density profile of the dust varies roughly as 1/r, which is consistent with mm observations of spatially resolved disk of Mundy et al. (2000).

Pascale Garaud; Douglas N. C. Lin

2006-05-03T23:59:59.000Z

165

Milling Machine Replacement Project (4587), 5/11/2012  

Broader source: Energy.gov (indexed) [DOE]

by E-mail The proposed action is to replace two large milling machines with two new medium sized CNC milling machines. The new machines will be connected to the digital...

166

Drop-in replacement biofuels : meeting the challenge  

E-Print Network [OSTI]

This thesis presents a discussion on the challenges that must be met to fulfill the U.S. Navy's strategic imperatives for its energy vision. It provides an introduction to drop-in replacement biofuels, the options amongst ...

Bhargava, Alok (Alok Kishore)

2011-01-01T23:59:59.000Z

167

EA-0923: Winnett School District Boiler Replacement Project, Winnett, Montana  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the proposal to replace the Winnett School District complex's existing oil-fired heating system with a new coal-fired heating system with funds...

168

Washington State Department of Ecology: Replacement Wells Requiring...  

Open Energy Info (EERE)

Ecology: Replacement Wells Requiring a Water Right Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Washington State Department of...

169

Laboratory Evaluation of LED T8 Replacement Lamp Products  

SciTech Connect (OSTI)

A report on a lab setting analysis involving LED lamps intended to directly replace T8 fluorescent lamps (4') showing light output, power, and economic comparisons with other fluorescent options.

Richman, Eric E.; Kinzey, Bruce R.; Miller, Naomi J.

2011-05-23T23:59:59.000Z

170

Ultrasound image guided acetabular implant orientation during total hip replacement  

DOE Patents [OSTI]

A system for assisting in precise location of the acetabular implant during total hip replacement. The system uses ultrasound imaging for guiding the placement and orientation of the implant.

Chang, John; Haddad, Waleed; Kluiwstra, Jan-Ulco; Matthews, Dennis; Trauner, Kenneth

2003-08-19T23:59:59.000Z

171

Replace Pressure-Reducing Valves with Backpressure Turbogenerators  

SciTech Connect (OSTI)

This revised ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

172

Developing a total replacement cost index for suburban office projects  

E-Print Network [OSTI]

Understanding the components of replacement costs for office developments, and how these components combine to create total development costs is essential for success in office real estate development. Surprisingly, the ...

Hansen, David John, S.M. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

173

Replacing Motors Counting Savings: Results from a 100 Motor Study  

E-Print Network [OSTI]

REPLACING MOTORS, COUNTING SAVINGS: RESULTS FROM A 100 MOTOR STUDY Nicole M. Kaufman Motor Systems Engineer Advanced Energy Raleigh, NC ABSTRACT Software tools such as MotorMaster+ aid facility personnel in conducting payback... analyses for replacing motors. These tools make assumptions on the motors’ operational efficiency in their calculations. By observing 100 pre-EPCA (Energy Policy & Conservation Act) motors in operation, removing them from service and conducting IEEE...

Kaufman, N. M.

2006-01-01T23:59:59.000Z

174

Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each  

E-Print Network [OSTI]

Diploma Replacement Request Form Students who have misplaced or lost their original diplomas may order a replacement diploma. The cost for each replacement diploma is $25.00 ($35.00 for D.M.D, J.D., LL.M., and M.D). Please fill out the applicable information and mail it to the address below. Replacement

Guenther, Frank

175

10 CFR 830 Major Modification Determination for the ATR Diesel Bus (E-3) and Switchgear Replacement  

SciTech Connect (OSTI)

Near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project, subject of this determination, will replace the existent diesel-electrical bus (E-3) and associated switchgear. More specifically, INL proposes transitioning ATR to 100% commercial power with appropriate emergency backup to include: • Provide commercial power as the normal source of power to the ATR loads currently supplied by diesel-electric power. • Provide backup power to the critical ATR loads in the event of a loss of commercial power. • Replace obsolescent critical ATR power distribution equipment, e.g., switchgear, transformers, motor control centers, distribution panels. Completion of this and two other age-related projects (primary coolant pump and motor replacement and emergency firewater injection system replacement) will resolve major age related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues make the project a major modification: 1. Evaluation Criteria #2 (Footprint change). The addition of a new PC-4 structure to the ATR Facility to house safety-related SSCs requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., structural qualification, fire suppression) to ensure no adverse impacts to the safety-related functions of the housed equipment. 2. Evaluation Criteria #3 (Change of existing process). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps requires careful attention and analysis to ensure it meets a project primary object to maintain or reduce CDF and does not negatively affect the efficacy of the currently approved strategy. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). The change to the strategy for providing continuous reliable power to the safety-related emergency coolant pumps, based on the pre-conceptual design, will require the addition of two quick start diesel generators, their associated power coordination/distribution controls, and a UPS to the list of safety-related SSCs. Similarly to item 1 above, the addition of these active SSCs to the list of safety-related SSCs and replacement of the E-3 bus requires careful attention to maintaining adherence to applicable engineering and nuclear safety design criteria (e.g., seismic qualification, isolation of redundant trains from common fault failures) to ensure no adverse impacts to the safety-related functions.

Noel Duckwtiz

2011-05-01T23:59:59.000Z

176

Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2  

E-Print Network [OSTI]

Atom Replacement in Hypergraphs Annegret Habel 1 and Renate Klempien-Hinrichs 2 1 Carl v. Ossietzky. TAGT'98, Universitat-GH Paderborn, 182-189, 1998. Node replacement and hyperedge replacement are two, we combine both concepts to a concept of atom replacement that allows the replacement of the atomic

Habel, Annegret

177

Functional replacement of a primary metabolic pathway via multiple independent eukaryote-to-eukaryote gene transfers  

E-Print Network [OSTI]

Functional replacement of a primary metabolic pathway via multiple independent eukaryote can be added to the recipient's gene complement (gene additions) or simply replace existing endogenous counterparts (functional replacements). The recruitment of novel genes is thought to allow the recipient

Nedelcu, Aurora M.

178

phenix.mr_rosetta: a new tool for difficult molecular replacement problems  

SciTech Connect (OSTI)

The PHENIX development team is working with the Baker laboratory at the University of Washington to combine the power of Rosetta structure modeling with PHENIX automated molecular replacement (MR), model-building, density modification, and refinement. The basic idea is to find MR solutions with phenix. automr, rebuild them with Rosetta, including electron density map information, then rebuild those models with phenix. autobuild. The combination of Rosetta rebuilding and phenix rebuilding is the key part of this method. MR solutions are found with phenix. automr (Phaser), scored with LLG (optionally following Rosetta relaxation), the best solutions are picked and rebuilt with Rosetta including map information, the resulting models are scored with Rosetta, and then rescored with LLG, and the top models are rebuilt with phenix. autobuild. It can be very useful for cases where the search model used in molecular replacement is slightly too distant to rebuild successfully with phenix. autobuild. It can also be useful in cases where the model is too distant to even find a molecular replacement solution, and prerefinement with Rosetta can yield an improved search model.

Terwilliger, Thomas C [Los Alamos National Laboratory; Read, Randy [UNIV OF CAMBRIDGE; De Maio, Frank [UNIV OF WASHINGTON; Baker, David [UNIV OF WASHINGTON

2011-01-12T23:59:59.000Z

179

Rehab permits desert line to run at original pressures  

SciTech Connect (OSTI)

An extensive inspection and rehabilitation program on a 34-in. desert pipeline in gas-condensate service has restored the line to full operating pressures and ensured the line's active service life for at least 20 years. Since Agip Oil Co. Ltd. built the 133-km pipeline in 1972 using API 5L Grade X-60, it has suffered six known failures. There has been no single cause of the failures. As a consequence of the failures, the line has been progressively down rated from the original operating pressure of 700 psig to 500 psig. So that the line could again be operated between 650 and 700 psig, two options have been considered: extensive study and investigation leading to inspection and replacement of suspect pipe: total replacement of the line. These options were evaluated from economic and safety points of view. A major consideration was that the line will be operating in its current manner for only the next 2 years before changing to dry-gas transportation. The first option was therefore considered viable. The paper discusses the failure mechanisms, the history of hydrogen-induced cracking, the 1989 failure, survey results, calculation of acceptable pressures, and the rehabilitation program.

Kurdi, A.M.; Abougfeefa, M.S. (Agip Oil Co. Ltd., Tripoli (Libyan Arab Jamahiriya)); Denney, A.K. (John Brown Engineering and Constructors Ltd., London (United Kingdom))

1993-07-26T23:59:59.000Z

180

Microstructure, Mechanical Behavior, and Clinical Trade-offs in Ultra-High Molecular Weight Polyethylene for Total Joint Replacement  

E-Print Network [OSTI]

components for total joint replacement. J Bone Joint Surgcontemporary total knee replacements. Clin Orthop Relat Res(wear in total joint replacement? J Am Acad Orthop Surg, 16

Atwood, Sara Anne

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines  

E-Print Network [OSTI]

Multifrequency Wilkinson Power Divider Using Microstrip Nonuniform Transmission Lines Mohammad desired frequencies. The proposed structure contains two Microstrip Nonuniform Transmission Lines (MNTLs­6] and using composite right/left-handed transmission line (CRLH) [7]. The main disadvantage of multistage

Paris-Sud XI, Université de

182

The broadening of Lyman-alpha forest absorption lines  

E-Print Network [OSTI]

We provide an analytical description of the line broadening of HI absorbers in the Lyman-alpha forest resulting from Doppler broadening and Jeans smoothing. We demonstrate that our relation captures the dependence of the line-width on column density for narrow lines in z~3 mock spectra remarkably well. Broad lines at a given column density arise when the underlying density structure is more complex, and such clustering is not captured by our model. Our understanding of the line broadening opens the way to a new method to characterise the thermal state of the intergalactic medium and to determine the sizes of the absorbing structures.

Garzilli, Antonella; Schaye, Joop

2015-01-01T23:59:59.000Z

183

VICKERY, JOHN D. Fundamental Properties and Bond Characteristics of Chlorinated Polyvinyl Chloride and SS340 Adhesive for Evaluation of Steel Tank Linings. (Under  

E-Print Network [OSTI]

Chloride and SS340 Adhesive for Evaluation of Steel Tank Linings. (Under the Direction of Dr. Sami Rizkalla.) Tank linings are used to extend the service life of tanks and to avoid replacement of damaged tanks is to understand the behavior of the different materials proposed for lining typical bleach tanks used in the pulp

184

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

185

Replacing the whole barrel of oil with plants and microbes  

SciTech Connect (OSTI)

In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

Simmons, Blake

2013-05-29T23:59:59.000Z

186

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

187

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

188

HVAC & Building Management Control System Energy Efficiency Replacements  

SciTech Connect (OSTI)

The project objective was the replacement of an aging, un-repairable HVAC system which has grown inefficient and a huge energy consumer with low energy and efficient HVAC units, and installation of energy efficient building control technologies at City's YMCA Community Center.

Hernandez, Adriana

2012-09-21T23:59:59.000Z

189

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories?  

E-Print Network [OSTI]

Can Computer Simulations Replace Real Equipment in Undergraduate Laboratories? N. D. Finkelstein, K, Boulder Abstract. This paper examines the effects of substituting computer simulations in place of real (DC) circuit laboratory was modified to compare the effects of using computer simulations

Colorado at Boulder, University of

190

Replacing the whole barrel of oil with plants and microbes  

ScienceCinema (OSTI)

In this May 13, 2013 talk, Blake Simmons discusses how scientists are exploring how plants and microbes can be used to replace many of the everyday goods we use that are derived from petroleum. To watch the entire entire Science at the Theater event, in which seven of our scientists present BIG ideas in eight minutes each.

Simmons, Blake

2014-06-24T23:59:59.000Z

191

Data Mining For Prediction of Aircraft Component Replacement  

E-Print Network [OSTI]

Data Mining For Prediction of Aircraft Component Replacement Sylvain Letourneau1 Fazel Famili1 Stan the number of delays, and increasing the overall level of safety. Several data mining techniques exist from the data obtained during the operation and maintenance of aircraft is extremely challenging. Di

Matwin, Stan

192

Electric Transmission Lines (Nebraska)  

Broader source: Energy.gov [DOE]

The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

193

Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures  

E-Print Network [OSTI]

Reducing the Replacement Overhead on COMA Protocols for Workstation-Based Architectures Diego R discuss the behavior of the replacement mechanism of well-known COMA protocols applied to a loosely replacement mecha- nism in order to select the destination node of a replacement transaction without

Llanos, Diego R.

194

Mineral replacement rate of olivine by chrysotile and brucite under high1 alkaline conditions2  

E-Print Network [OSTI]

1 Mineral replacement rate of olivine by chrysotile and brucite under high1 alkaline conditions2 3.1016/j.jcrysgro.2012.02.040 #12;2 Abstract16 Olivine mineral replacement by serpentine is one major replaced by18 chrysotile and brucite under high alkaline conditions. In our study, olivine replacement19

Paris-Sud XI, Université de

195

University of South Carolina Office of the University Registrar Request for Replacement Diploma  

E-Print Network [OSTI]

University of South Carolina Office of the University Registrar P F Request for Replacement Diploma Please Note Replacement diplomas are duplicates of the original diploma issued by USC. A request on the replacement diploma will reflect those of the current University Officers. Replacements can take up to 90 days

Almor, Amit

196

Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement  

E-Print Network [OSTI]

Experimental study on the cause of insufficiency of a transcutaneous pulmonary valve replacement for the replacement of pulmonary heart valves. This technique is a minimally invasive alternative to the replacement on known causes for insufficiencies of transcutaneous heart valve replacements. Out of that information

Berlin,Technische Universität

197

Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25, 2012)  

E-Print Network [OSTI]

Initial submission or replacement of an Investigator's Brochure Page 1 of 2 (Version: January 25 or Replacement of an Investigator's Brochure or Product Monograph This form replaces a letter of explanation from or replacement of an Investigator's Brochure Page 2 of 2 (Version: January 25, 2012) 5) List all forms

Shoubridge, Eric

198

Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and  

E-Print Network [OSTI]

Page | 1 Application for the Issue of a Replacement Transcript To apply for the issue of a replacement transcript, complete all relevant sections below and return this form to Examinations students You will not be charged for this service. A replacement transcript can be supplied

Neirotti, Juan Pablo

199

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress. 16 figures.

Tuckerman, D.B.

1991-05-21T23:59:59.000Z

200

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress.

Tuckerman, David B. (Livermore, CA)

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Geodesic Lines, . . . Covariant . . .  

E-Print Network [OSTI]

Geodesic Lines, . . . Covariant . . . Home Page Title Page Page 781 of 818 Go Back Full Screen Close Quit 14.11. Geodesic Lines, Local Gauss-Bonnet Theorem Geodesics play a very important role in surface theory and in dynamics. One of the main reasons why geodesics are so important

Gallier, Jean

202

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

203

Intrinsic AGN Absorption Lines  

E-Print Network [OSTI]

Strong absorption lines are common in rest-frame UV spectra of AGNs due to a variety of resonant transitions, for example the HI Lyman series lines (most notably Ly-alpha 1216) and high-ionization doublets like CIV 1549,1551. The lines are called ``intrinsic'' if the absorbing gas is physically related to the AGN, e.g. if the absorber resides broadly within the radius of the AGN's surrounding ``host'' galaxy. Intrinsic absorption lines are thus valuable probes of the kinematics, physical conditions and elemental abundances in the gas near AGNs. Studies of intrinsic absorbers have historically emphasized the broad absorption lines (BALs) in quasars. Today we recognize a wider variety of intrinsic lines in a wider range of objects. For example, we now know that Seyfert 1 galaxies (the less luminous cousins of quasars) have intrinsic absorption. We also realize that intrinsic lines can form in a range of AGN environments --- from the dynamic inner regions like the BALs, to the more quiescent outer host galaxies >10 kpc away. This article provides a brief introduction to current observational and theoretical work on intrinsic AGN absorbers.

Fred Hamann

2000-06-12T23:59:59.000Z

204

Stochastic Ratchet Mechanisms for Replacement of Proteins Bound to DNA  

E-Print Network [OSTI]

Experiments indicate that unbinding rates of proteins from DNA can depend on the concentration of proteins in nearby solution. Here we present a theory of multi-step replacement of DNA-bound proteins by solution-phase proteins. For four different kinetic scenarios we calculate the depen- dence of protein unbinding and replacement rates on solution protein concentration. We find (1) strong effects of progressive 'rezipping' of the solution-phase protein onto DNA sites liberated by 'unzipping' of the originally bound protein; (2) that a model in which solution-phase proteins bind non-specifically to DNA can describe experiments on exchanges between the non specific DNA- binding proteins Fis-Fis and Fis-HU; (3) that a binding specific model describes experiments on the exchange of CueR proteins on specific binding sites.

Simona Cocco; John F. Marko; Remi Monasson

2014-05-26T23:59:59.000Z

205

OSRAM SYLVANIA Develops High-Efficiency LED Troffer Replacement  

Broader source: Energy.gov [DOE]

With the help of DOE funding, OSRAM SYLVANIA is developing a high-efficiency LED 2'x2' troffer replacement that is expected to be commercially available in the spring of 2012 and to be cost-competitive with existing troffers of that size. It is projected to have a light output of up to 4,000 lumens, an efficacy of more than 100 lm/W, and a CCT of 3500K.

206

Measure Guideline: Air Conditioner Diagnostics, Maintenance, and Replacement  

SciTech Connect (OSTI)

This guideline responds to the need for an efficient means of identifying, diagnosing, and repairing faults in air conditioning systems in existing homes that are undergoing energy upgrades. Inadequate airflow due to constricted ducts or undersized filters, improper refrigerant charge, and other system defects can be corrected at a fraction of the cost of equipment replacement and can yield significant savings. The guideline presents a two-step approach to diagnostics and repair.

Springer, D.; Dakin, B.

2013-03-01T23:59:59.000Z

207

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

208

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

209

The National Energy Policy Act and lamp replacement options  

SciTech Connect (OSTI)

The National Policy Act of 1992 involves the creation of energy efficiency standards for a wide range of products including fluorescent and incandescent lamps. Minimum efficacy (lumens per watt) and color rendering index (CRI) standards are mandated for the popular fluorescent lamps: four-foot medium bi-pin, two-foot U-bent, eight-foot slimline and eight-foot high output. Minimum efficacies are mandated for specific incandescent R and PAR reflector lamps. These standards will affect selected colors and designs of fluorescent lamps, the most significant being the standard lamps in the cool white and warm white colors. The incandescent reflector lamps will include the R-30, R-40, PAR-38 lamps above 40 watts, excluding the halogen types. These efficiency and color rendering standards will require end-users and specifiers to select replacement fluorescent lamps from a range of performance characteristics (lumen output, efficacy, CRI and price). The choice of replacement for the R and PAR incandescent lamps will include the halogen designs and compact fluorescent designs. In this paper, replacement options will be analyzed and discussed and the effect of these options on the performance of the lighting system will be explored in detail.

Ryerson, C.

1995-06-01T23:59:59.000Z

210

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

211

Holes in Spectral Lines  

E-Print Network [OSTI]

The decay of an atom in the presence of a static perturbation is investigated. The perturbation couples a decaying state with a nondecaying state. A "hole" appears in the emission line at a frequency equal to the frequency ...

Fontana, Peter R.; Srivastava, Rajendra P.

1973-06-01T23:59:59.000Z

212

Power line detection system  

DOE Patents [OSTI]

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

Latorre, Victor R. (Tracy, CA); Watwood, Donald B. (Tracy, CA)

1994-01-01T23:59:59.000Z

213

Power line detection system  

DOE Patents [OSTI]

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

Latorre, V.R.; Watwood, D.B.

1994-09-27T23:59:59.000Z

214

Line Extension Alternatives  

Broader source: Energy.gov [DOE]

The Public Service Board (PSB) of Vermont developed rules regarding utility line extension requests. While the majority of the rules focus on the procedure followed (and associated fees) for the...

215

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

216

A Centrifugal Contactor Design to Facilitate Remote Replacement  

SciTech Connect (OSTI)

Advanced designs of nuclear fuel recycling and radioactive waste treatment plants are expected to include more ambitious goals for solvent extraction based separations including; higher separations efficiency, high-level waste minimization, and a greater focus on continuous processes to minimize cost and footprint. Therefore, Annular Centrifugal Contactors (ACCs) are destined to play a more important role for such future processing schemes. This work continues the development of remote designs for ACCs that can process the large throughputs needed for future nuclear fuel recycling and radioactive waste treatment plants. A three stage, 12.5 cm diameter rotor module has been constructed and is being evaluated for use in highly radioactive environments. This prototype assembly employs three standard CINC V-05 clean-in-place (CIP) units modified for remote service and replacement via new methods of connection for solution inlets, outlets, drain and CIP. Hydraulic testing and functional checks were successfully conducted and then the prototype was evaluated for remote handling and maintenance. Removal and replacement of the center position V-05R contactor in the three stage assembly was demonstrated using an overhead rail mounted PaR manipulator. Initial evaluation indicates a viable new design for interconnecting and cleaning individual stages while retaining the benefits of commercially reliable ACC equipment. Replacement of a single stage via remote manipulators and tools is estimated to take about 30 minutes, perhaps fast enough to support a contactor change without loss of process equilibrium. The design presented in this work is scalable to commercial ACC models from V-05 to V-20 with total throughput rates ranging from 20 to 650 liters per minute.

David H. Meikrantz; Jack. D. Law; Troy G. Garn; Lawrence L. Macaluso

2011-03-01T23:59:59.000Z

217

Overview of CFC replacement issues for household refrigeration  

SciTech Connect (OSTI)

In 1974, the famous ozone depletion theory of Rowland and Molina claimed that chlorofluorocarbons (CFCs) diffuse into the stratosphere where they are broken down by photolysis to release chlorine atoms that catalytically destroy ozone. Although the understanding of the science is still imperfect, there is little doubt that CFCs play a major role in the Antarctic ozone hole phenomenon and the decline in ozone observed in the rest of the world. Another issue that has become increasingly important is the potential of CFCs to change the earth`s temperature and to modify the climate. While the main impact in global warming is made by increased concentrations of carbon dioxide, CFCs and other trace gases also contribute to this effect. In an effort to respond to the global environmental threat, a CFC protocol was adopted during a diplomatic conference in Montreal. This document, known as the Montreal Protocol, was ratified in 1988 and put into effect on January 1, 1989. In accordance with Article 6 of the Montreal Protocol, the countries that signed the agreement shall periodically assess the control measures provided for in the Protocol. As part of that assessment process, household refrigeration was investigated to determine the status of CFC-12 replacements. The conclusion was that much progress has been made towards finding a suitable replacement. Compressors designed for HFC-134a have efficiencies comparable to those for CFC-12 and acceptable reliability tests have been obtained with ester lubricants. In addition, other replacements such as R-152a and refrigerant mixtures exist, but will require more study. Cycle options, such as the Stirling cycle, may be viable, but are further out in the future. The impact of new refrigerants is expected to result in elimination of CFC-12 consumption in developed countries by 1997 and in developing countries by 2005.

Vineyard, E.A. [Oak Ridge National Lab., TN (United States); Roke, L. [Fisher and Paykel, Auckland (New Zealand); Hallett, F. [Frigidaire, Washington, DC (United States)

1991-12-31T23:59:59.000Z

218

For Immediate Release --Wednesday, July 4, 2012 Water Pipe Replacement Closes Three Campus Buildings, July  

E-Print Network [OSTI]

1 For Immediate Release -- Wednesday, July 4, 2012 Water Pipe Replacement water supply pipe as well as building isolation valves. The main water to happen again. The pipe replacement is part of a $5.6 million upgrade

Morris, Joy

219

Geography Access Control / Identification Application Application Type: New Update/Addition Replacement Temporary  

E-Print Network [OSTI]

/Addition Replacement Temporary The following is to be completed by the employee (type or print legibly): Last name _____________________ $15 Access & Identification, $10 Identification Card only, $10 replacement fee for either Affiliation

California at Santa Barbara, University of

220

Programmatic mission capabilities - chemistry and metallurgy research replacement (CMRR) project  

SciTech Connect (OSTI)

CMRR will have analysis capabilities that support all the nuclear-material programs and national security needs. CMRR will replace the aging CMR Building and provide a key component responsive infrastructure necessary to sustain all nuclear programs and the nuclear-weapons complex. Material characterization capabilities - evaluate the microstructures and properties of nuclear materials and provide experimental data to validate process and performance models. Analytical chemistry capabilities - provide expertise in chemical and radiochemical analysis of materials where actinide elements make up a significant portion of the sample.

Gunderson, L Nguyen [Los Alamos National Laboratory; Kornreich, Drew E [Los Alamos National Laboratory; Wong, Amy S [Los Alamos National Laboratory

2011-01-04T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Embryo collection and attempted replacement in the mare  

E-Print Network [OSTI]

embryo collections, was similar to that described by Oguri and Tsutsumi (1980). An 18 gauge Foley 3-way catheter with a 75 cc balloon (Bardex, Bard Hospital Division, C. R. Bard Inc. , Murray Hill, New Jersey) was introduced into the vagina by hand... (Member) J. D. McCrady (Head of Department) August 1983 ABSTRACT Embryo Collection and Attempted Replacement in the Mare (August, 1983) Jane S, Beach, B. S. , Texas A&M University Chairman of advisory committee: Dr. Duane C. Kraemer Embryos were...

Beach, Jane Salisbury

1983-01-01T23:59:59.000Z

222

RandomString is a small web application, containing one java servlet. It allows users to enter a list of strings to be randomly chosen with two options: with replacement or without replacement (default).  

E-Print Network [OSTI]

a list of strings to be randomly chosen with two options: with replacement or without replacement of strings and choosing them randomly with two options: with replacement or without replacement (default strings are separated by carriage return. 2. User selects to randomly choose strings `without replacement

Offutt, Jeff

223

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) vs. Sensory, Input-  

E-Print Network [OSTI]

A Comparison of Local vs. Sensory, Input- Driven, Wide Area Reactive Power Control Jonathan W. Stahlhut, Member. J. W. Stahlhut is with the Electrical Engineering Department, Arizona State University, Tempe, AZ, 85287 USA (e-mail: jonathan.stahlhut@asu.edu). G. T. Heydt is with the Electrical Engineering Department

224

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) green-networking is raising  

E-Print Network [OSTI]

- Research in the field of green-networking is raising more and more interest, in particular driven by energy or management strategies for greening the Internet relies on an initial study of the energy consumption consumption, Router, Wattmeter, energy saving, Internet greening, Green Internet management I. INTRODUCTION

Boyer, Edmond

225

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) green-networking is raising  

E-Print Network [OSTI]

- Research in the field of green-networking is raising more and more interest, in particular driven by energy saving purposes. Recent research dealt on one hand to design new mechanisms to reduce the energy consumed in a network device and a second to establish protocols which take into account the energy profile

Boyer, Edmond

226

Blythe-Knob\t161-kV\tTransmission\tLine Cross\tArm\tReplacements\t...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

species (such as under the Bald and Golden Eagle Protection Act or the Migratory Bird Treaty Act); X (iii) Floodplains and wetlands (as defined in 10 CFR 1022.4, -Compliance...

227

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA  

E-Print Network [OSTI]

Wood Pellets for UBC Boilers Replacing Natural Gas Based on LCA Submitted to Dr. Bi By Bernard Chan Pellets for UBC Boilers Replacing Natural Gas" By Bernard Chan, Brian Chan, and Christopher Young Abstract This report studies the feasibility of replacing natural gas with wood pellets for UBC boilers. A gasification

228

Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1;3 .  

E-Print Network [OSTI]

Simultaneous Replacement in Normal Programs Annalisa Bossi 1 , Nicoletta Cocco 2 , Sandro Etalle 1@zenone.math.unipd.it, cocco@moo.dsi.unive.it, etalle@cwi.nl October 13, 1994 Abstract The simultaneous replacement results for Fitting's and Kunen's semantics. We also show how simultaneous replacement can mimic other

Cocco, Nicoletta

229

Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions  

E-Print Network [OSTI]

Mineral replacement rate of olivine by chrysotile and brucite under high alkaline conditions Romain Available online 8 March 2012 Keywords: A1. Mineral replacement rate A1. Serpentinization A1. TG analyses B1. Alkaline medium B2. Chrysotile nanotubes a b s t r a c t Olivine mineral replacement by serpentine is one

Montes-Hernandez, German

230

Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jimenez  

E-Print Network [OSTI]

Dead Block Replacement and Bypass with a Sampling Predictor Daniel A. Jim´enez Department of Computer Science The University of Texas at San Antonio Abstract We present a cache replacement and bypass policy driven by dead block prediction. A block is considered dead is it will be replaced before

Paris-Sud XI, Université de

231

evolution via the replacement of two-membrane plastids would have to be  

E-Print Network [OSTI]

evolution via the replacement of two- membrane plastids would have to be accompanied by the origin be easily overcome by assuming that four-membrane plastids have evolved via the replacement of three-membrane plastids would be an example of a secondary (replacement of a prokaryotic by a eukaryotic plastid

McFadden, Geoff

232

Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view  

E-Print Network [OSTI]

Replacement policies for shared caches on symmetric multicores : a programmer-centric point of view-cache replacement policy can be modified for self- performance to be meaningful. Categories and Subject Descriptors multicore processor, quality of service, self-per- formance, shared cache, replacement policy, memory band

Paris-Sud XI, Université de

233

Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT  

E-Print Network [OSTI]

Questions? Call 540/231-8636 REQUEST FOR DIPLOMA REPLACEMENT/REPRINT PAGE 1 OF 1, NOVEMBER 2013 REQUEST FOR GRADUATE DIPLOMA REPLACEMENT/REPRINT Return your completed form to: Graduate School Graduate of the replacement diploma. Current graduate diplomas measure 11" by 14". Your diploma will be printed with the legal

Buehrer, R. Michael

234

Biased Replacement Policies for Web Caches: Differential QualityofService and Aggregate User Value \\Lambda  

E-Print Network [OSTI]

Biased Replacement Policies for Web Caches: Differential Quality­of­Service and Aggregate User reduction to different degrees, a replacement policy which priori­ tizes cache space across servers can­frequently­used (LFU) replacement that is sensitive to varying levels of server valuation for cache hits. Through trace

Jamin, Sugih

235

STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM  

E-Print Network [OSTI]

STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-4R TESTING CF-4R-MECH-20 Duct Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site, and also for completely new or replacement duct systems in existing dwellings. For existing dwellings

236

Image-Based Texture Replacement Using Multiview Images Technion Israel Inst. of Technology  

E-Print Network [OSTI]

Image-Based Texture Replacement Using Multiview Images Doron Tal Technion ­ Israel Inst replacement is one such task. It is the process of painting a new texture over an ex- isting textured image for perform- ing texture replacement, which is based on multiview stereo tech- niques that produce depth

Tal, Ayellet

237

Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement  

E-Print Network [OSTI]

100 Effects of Variation in Surgical Technique on Range of Motion in Total Knee Replacement Dipnil replacement. The purpose of this study was to use computer simulation to study the effects of resecting too-tissue tensions, and articular contact forces. INTRODUCTION Total knee replacement (TKR) is a reliable and widely

Omiecinski, Curtis

238

Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart  

E-Print Network [OSTI]

Interactive Material Replacement in Photographs Steve Zelinka Hui Fang Michael Garland John C. Hart Department of Computer Science University of Illinois at Urbana­Champaign Figure 1: Replaced materials replacement has wide application through- out the entertainment industry, particularly for post- production

Garland, Michael

239

Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement  

E-Print Network [OSTI]

Varying the prior 29 Appendix C. Quality of the posterior estimates from prior replacement replacement may out-perform prior-specific training in some aspects of the quality of the estimated posterior, since the prior is known analytically, the posterior can also be estimated by prior replacement. To do

240

Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W. Weide  

E-Print Network [OSTI]

Dynamic Module Replacement in Distributed Protocols Nigamanth Sridhar, Scott M. Pike, and Bruce W nsridhar,pike,weide @cis.ohio-state.edu Abstract Dynamic module replacement -- the ability to hot swap-neutral technique for dynamic module replacement using Service Facilities (Serfs) -- a pattern- based design

Weide, Bruce W.

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Replacement Diploma Name Change Office of Records and Registration rev. 06/11  

E-Print Network [OSTI]

Replacement Diploma Name Change Office of Records and Registration rev. 06/11 Clemson University will provide a replacement or additional diploma to graduates of the University for a fee of $50.00 per diploma. Replacement and additional diplomas are printed on paper stock being used by the University at the time

Bolding, M. Chad

242

Application for a Replacement Testamur ADM18-V02/14  

E-Print Network [OSTI]

Application for a Replacement Testamur ADM18-V02/14 RECEIVED Please retain this copy as proof an institution that has amalgamated with Monash University may apply for a replacement testamur if their original the application form. Damaged: If you require a replacement testamur because your original testamur is damaged, we

Albrecht, David

243

ON THE LINEAR GROWTH OF THE SPLITANDMERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT MODEL  

E-Print Network [OSTI]

ON THE LINEAR GROWTH OF THE SPLIT­AND­MERGE SIMULATION TREE FOR A MULTICOMPONENT AGE REPLACEMENT Functional estimation, split­and­merge tree, opti­ mization, maintenance models, age replacement poli­ cies Abstract We a consider a replacement policy based on age thresholds, for a multicomponent system. We want

Vázquez-Abad, Felisa J.

244

Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement Project  

E-Print Network [OSTI]

PENNSTATE Department of Industrial Engineering Spring 2010 ArcelorMittal's Taphole Replacement the current taphole replacement problem Use advanced decision-making tools to select an optimal concept to be manufactured An SOP was created that standardized the taphole replacement process and reduced overall

Demirel, Melik C.

245

Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton  

E-Print Network [OSTI]

Re^Os evidence for replacement of ancient mantle lithosphere beneath the North China craton Shan and was replaced by more fertile lithospheric mantle sometime after the Paleozoic. Moreover, lithospheric mantle crust (2700 Ma), suggesting that the original Archean lithosphere was replaced in the Proterozoic

Rudnick, Roberta L.

246

Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks  

E-Print Network [OSTI]

1 Node-Replacement Policies to Maintain Threshold-Coverage in Wireless Sensor Networks Sachin the sensing coverage falls below the minimum threshold-coverage. We develop three node-replacement policies failed sensor node for replacement. Based on different performance criteria, every time a sensor node

Vokkarane, Vinod M.

247

Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network  

E-Print Network [OSTI]

Energy-ef cient Cache Replacement Policies for Cooperative Caching in Mobile Ad Hoc Network dynamically. Most existing cache strategies perform replacement independently, and they seldom consider coordinated replacement and energy saving issues in the context of a mobile ad hoc network. In this paper, we

Chan, Edward

248

STATE OF CALIFORNIA DUCT LEAKAGE TEST COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM  

E-Print Network [OSTI]

STATE OF CALIFORNIA DUCT LEAKAGE TEST ­ COMPLETELY NEW OR REPLACEMENT DUCT SYSTEM CEC- CF-6R Leakage Test ­ Completely New or Replacement Duct System (Page 1 of 3) Site Address: Enforcement Agency new or replacement duct systems in existing dwellings. For existing dwellings, a completely new

249

Shake them all! Rethinking Selection and Replacement in MOEA/D  

E-Print Network [OSTI]

Shake them all! Rethinking Selection and Replacement in MOEA/D Gauvain Marquet Bilel Derbel Arnaud-specific operators, and (iii) replace neighbors' solutions if the generated offspring is better. We remark is critical for an accurate explo- ration/exploitation balance. Moreover, the replacement mechanism (Step (iii

Paris-Sud XI, Université de

250

Nuclear criticality safety assessment of the proposed CFC replacement coolants  

SciTech Connect (OSTI)

The neutron multiplication characteristics of refrigerant-114 (R-114) and proposed replacement coolants perfluorobutane (C{sub 4}F{sub 10}) and cycloperfluorobutane C{sub 4}F{sub 8}) have been compared by evaluating the infinite media multiplication factors of UF{sub 6}/H/coolant systems and by replacement calculations considering a 10-MW freezer/sublimer. The results of these comparisons demonstrate that R-114 is a neutron absorber, due to its chlorine content, and that the alternative fluorocarbon coolants are neutron moderators. Estimates of critical spherical geometries considering mixtures of UF{sub 6}/HF/C{sub 4}F{sub 10} indicate that the flourocarbon-moderated systems are large compared with water-moderated systems. The freezer/sublimer calculations indicate that the alternative coolants are more reactive than R-114, but that the reactivity remains significantly below the condition of water in the tubes, which was a limiting condition. Based on these results, the alternative coolants appear to be acceptable; however, several follow-up tasks have been recommended, and additional evaluation will be required on an individual equipment basis.

Jordan, W.C.; Dyer, H.R.

1993-12-01T23:59:59.000Z

251

Omega Transmission Lines  

E-Print Network [OSTI]

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

252

Effect of HVDC line faults on transient torsional torques of turbine-generator shafts  

SciTech Connect (OSTI)

This paper investigates the effects of HVdc line faults, line de-energization, and line re-energization on the transient torsional stresses of steam turbine-generator (T-G) units. The studies are conducted on a bipole HVdc system which connects a T-G set to a large ac system. The shaft transient stresses of the T-G set as a result of HVac line fault, fault clearing, and automatic reclosure are also determined when the HVdc transmission system is replaced by an equivalent double-line HVac system. The EMTDC program is used for the simulation studies. The studies conclude that transient shaft stresses as a result of HVdc line fault and its subsequent switching events are (1) significantly less severe than those of HVac faults and subsequent switchings, and (2) not sensitive to the fault location and disturbance duration.

Shi, W. (Xi'an Jiaotong Univ. (China). Dept. of Electrical Engineering); Iravani, M.R. (Univ. of Toronto, Ontario (Canada). Dept. of Electrical Engineering)

1994-08-01T23:59:59.000Z

253

DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF  

SciTech Connect (OSTI)

The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manually or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.

Krementz, D.; Coughlin, Jeffrey

2009-05-05T23:59:59.000Z

254

FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device for a device that has been lost or stolen. Use and  

E-Print Network [OSTI]

FUEL DEVICE REPLACEMENT Use this application to request a replacement fuel access device as those explained in the original Fuel Device Application and for your convenience provided on this form Information Lost Stolen Unknown Date of last known use Certification of Use I certify that fuel access device

Kirschner, Denise

255

Experimental Results on Statistical Approaches to Page Replacement Policies  

SciTech Connect (OSTI)

This paper investigates the questions of what statistical information about a memory request sequence is useful to have in making page replacement decisions: Our starting point is the Markov Request Model for page request sequences. Although the utility of modeling page request sequences by the Markov model has been recently put into doubt, we find that two previously suggested algorithms (Maximum Hitting Time and Dominating Distribution) which are based on the Markov model work well on the trace data used in this study. Interestingly, both of these algorithms perform equally well despite the fact that the theoretical results for these two algorithms differ dramatically. We then develop succinct characteristics of memory access patterns in an attempt to approximate the simpler of the two algorithms. Finally, we investigate how to collect these characteristics in an online manner in order to have a purely online algorithm.

LEUNG,VITUS J.; IRANI,SANDY

2000-12-08T23:59:59.000Z

256

Chlorinated solvent replacements recycle/recovery review report  

SciTech Connect (OSTI)

This report is a literature review of waste solvents recycle/recovery methods and shows the results of solvent separations using membrane and distillation technologies. The experimental solvent recovery methods were conducted on solvent replacements for chlorinated solvents at Montana State University. The literature review covers waste solvents separation using distillation, membranes decantation, filtration, carbon adsorption, solvent extraction, and other vapor-phase separation techniques. The results of this study identify solvent distillation methods as the most common separation technique. The alternative separation methods typically supplement distillation. The study shows the need for industries to identify waste solvent disposal methods and investigate the economics of waste solvent recycling as a possible waste reduction method.

Beal, M.; Hsu, D.; McAtee, R.E.; Weidner, J.R. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Berg, L.; McCandless, F.P.; Waltari, S.; Peterson, C. [Montana State Univ., Bozeman, MT (United States). Dept. of Chemical Engineering

1992-08-01T23:59:59.000Z

257

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

258

Selecting renal replacement therapies: what do African American and non-African American patients and their families think others should know? A mixed methods study  

E-Print Network [OSTI]

making about renal replacement therapies. Qual Health ResOpen Access Selecting renal replacement therapies: what doneed to inform renal replacement therapy (RRT) decisions.

2013-01-01T23:59:59.000Z

259

Replacement of Mushroom Cage Gastrostomy Tube Using a Modified Technique to Allow Percutaneous Replacement with an Endoscopic Tube in Patients with Amyotrophic Lateral Sclerosis  

SciTech Connect (OSTI)

Radiologic inserted gastrostomy (RIG) is the preferred method in our institution for enteral feeding in amyotrophic lateral sclerosis (ALS). Skin-level primary-placed mushroom cage gastrostomy tubes become tight with weight gain. We describe a minimally invasive radiologic technique for replacing mushroom gastrostomy tubes with endoscopic mushroom cage tubes in ALS. All patients with ALS who underwent replacement of a RIG tube were included. Patients were selected for a modified replacement when the tube length of the primary placed RIG tube was insufficient to allow like-for-like replacement. Replacement was performed under local anesthetic and fluoroscopic guidance according to a preset technique, with modification of an endoscopic mushroom cage gastrostomy tube to allow percutaneous placement. Assessment of the success, safety, and durability of the modified technique was undertaken. Over a 60-month period, 104 primary placement mushroom cage tubes in ALS were performed. A total of 20 (19.2%) of 104 patients had a replacement tube positioned, 10 (9.6%) of 104 with the modified technique (male n = 4, female n = 6, mean age 65.5 years, range 48-85 years). All tubes were successfully replaced using this modified technique, with two minor complications (superficial wound infection and minor hemorrhage). The mean length of time of tube durability was 158.5 days (range 6-471 days), with all but one patient dying with a functional tube in place. We have devised a modification to allow percutaneous replacement of mushroom cage gastrostomy feeding tubes with minimal compromise to ALS patients. This technique allows tube replacement under local anesthetic, without the need for sedation, an important consideration in ALS.

Ammar, Thoraya [King's College Hospital, Department of Radiology (United Kingdom); Rio, Alan [King's College Hospital, Department of Dietetics (United Kingdom); Ampong, Mary Ann [King's College Hospital, Department of Neurosciences (United Kingdom); Sidhu, Paul S., E-mail: paulsidhu@nhs.ne [King's College Hospital, Department of Radiology (United Kingdom)

2010-06-15T23:59:59.000Z

260

Professional Human Capital Flows: Temporal Structure of Loss, Replacement and Contingent Bundling Effects on Firm Performance  

E-Print Network [OSTI]

to appropriate more value than s/he brings to the new firm (Coff, _______________ This dissertation follows the style of Academy of Management Journal. 2 Pa ge 2 2011; 1999). Despite the evidence that losing and gaining PHC can negatively affect...

Brymer, Rhett

2012-10-19T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Further Investigations of the Effect of Replacing Lithium by Sodium on Lithium Silicate Scintillating Glass Efficiency  

SciTech Connect (OSTI)

Ce3+ doped lithium (6Li) silicate glasses are thermal neutron detectors. Prior work showed that when sodium (Na) is substituted for Li the scintillation efficiency, under beta particle stimulation, increased and then decreased as the sodium (Na) content was increased [1]. When all the 6Li was replaced by Na no scintillation was observed. Raman spectra, acquired using a visible excitation source provided no evidence of anomalous behavior. SEM microscopy did show some phase separation, but there was no obvious correlation with the scintillation efficiency. We have reexamined these glass samples using deep UV Raman excitation which reduces fluorescence interference. The newly acquired spectra show evidence of phase separation in the glasses. Specifically we see a peak at 800 cm-1 Raman shift which can be assigned to a vitreous silica moiety that results from phase separation. There is a strong correlation between this peak's area, the scintillation efficiency, and the Na content. The observed trend suggests that phase separation enhances scintillation and addition of Na reduces the amount of phase separation. We also see evidence of at least two defect structures that can be tentatively assigned to a three-membered ring structure and an oxygen vacancy. The latter is fairly strongly correlated with enhanced scintillation efficiency.

Bliss, Mary; Aker, Pamela M.; Windisch, Charles F.

2012-02-15T23:59:59.000Z

262

Utility Lines and Facilities (Montana)  

Broader source: Energy.gov [DOE]

These regulations apply to the construction of utility and power lines and facilities. They address the use of public right-of-ways for such construction, underground power lines, and construction...

263

Polymeric materials replacement issues for the LANL stockpile.  

SciTech Connect (OSTI)

A number of materials in the LANL stockpile are no longer available due to lack of availability or environment, safety and health issues. Silastic S-5370 a polysiloxane foam used to manufacture multiple components in LANL systems has been discontinued by Dow Corning. Kerimid 601 is a polyimide resin used as the binder for the syntactic foam used as a support material in the W76. It contains MDA, which has been identified by OSHA as a carcinogen and is no longer used in the nuclear weapons complex. In addition, the Thornel carbon mat used in the syntactic foam formulation is no longer available. These issues have created major challenges in the effort to reestablish aft support production capability for the W76 LEP. Urethane Encapsulant 7200, an adhesive used to bond explosive booster pellets and detonator components, was originally manufactured by Hexcel Corporation and is no longer available. The details of the projects currently underway to provide replacements for these materials will be discussed.

Sandoval, C. W. (Cynthia W.); Gladysz, G. M. (Gary M.); Stephens, T. S. (Thomas S.); Gleiman, S. S. (Seth S.); Mendoza, D. (Daniel); Baker, G. K. (G. Keith); Schoonover, J. R. (Jon R.); Schneider, Jim; Perry, B. (Brian); Lula, J. W.

2002-01-01T23:59:59.000Z

264

Coronal emission lines as thermometers  

E-Print Network [OSTI]

Coronal emission line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G

2009-01-01T23:59:59.000Z

265

E-Print Network 3.0 - ankle replacement star Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

star Search Powered by Explorit Topic List Advanced Search Sample search results for: ankle replacement star Page: << < 1 2 3 4 5 > >> 1 BOSTON UNIVERSITY COLLEGE OF ENGINEERING...

266

E-Print Network 3.0 - arthroplasty replacement knee Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The BioMotion Foundation P... - eration in osteoarthritic knees and damage of polyethylene knee prostheses after total knee replacement... , before and after total knee ......

267

Feasibility/alternatives study for the planned replacement of Nuclear Material Safeguards System (NMSS)  

SciTech Connect (OSTI)

This document is a study which describes the NMSS replacement alternatives and provides recommended solutions. It also describes a NMSS Paradox prototype.

McBride, K.C.; Russell, V.K.

1994-10-04T23:59:59.000Z

268

Microsoft Word - CX-PascoDistrictPoleReplacement_FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor access...

269

Microsoft Word - CX-FY11PascoDistrictWoodPoleReplacement_WEB...  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Toby Cossairt Lineman Foreman III - TFPF-PASCO Proposed Action: Wood pole replacement and minor...

270

Microsoft Word - CX-Redmond-PilotButte-Lapine_RelayCommunicationReplac...  

Broader source: Energy.gov (indexed) [DOE]

7, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Jim Riehl Electrical Engineer - TECC-CSB-2 Proposed Action: Replace a relaytransfer trip rack at...

271

Microsoft Word - CX-CircuitBreakerReplacementsMultipleSubstationsFY12...  

Broader source: Energy.gov (indexed) [DOE]

12, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Michael Gilchrist Project Manager - TEP-TPP-1 Proposed Action: Power Circuit Breaker Replacement...

272

Microsoft Word - CX-WenatcheeDistrictPoleReplacementFY13_WEB...  

Broader source: Energy.gov (indexed) [DOE]

2, 2013 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Joseph Lauer Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

273

Microsoft Word - CX-FY11WenatcheeDistrictWoodPoleReplacement...  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 REPLY TO ATTN OF: KEPR-PASCO SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFWF-SCHULTZ Proposed Action: Wood pole replacement and minor...

274

E-Print Network 3.0 - australian replacement research Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

consumption be replaced by a zero... and Timetables of the Proposed Australian Emissions Trading Scheme Roger A. Pielke, Jr. Center for Science... and Technology Policy...

275

E-Print Network 3.0 - australian replacement research reactor...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

consumption be replaced by a zero... and Timetables of the Proposed Australian Emissions Trading Scheme Roger A. Pielke, Jr. Center for Science... and Technology Policy...

276

Text-Alternative Version: LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR®  

Broader source: Energy.gov [DOE]

Below is the text-alternative version of the LED Replacement Lamps: Current Performance and the Latest on ENERGY STAR® webcast.

277

Economic and Conservation Evaluation of Capital Renovation Projects: Edinburg Irrigation District Hidalgo County No. 1 - 72" Pipeline Replacing Delivery Canal and Multi-Size Pipeline Replacing Delivery Canal  

E-Print Network [OSTI]

). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for both components of the proposed project (i.e., 72" pipeline replacing a segment of delivery canal along...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

278

FD-BPM for Optical Waveguide Structures with Second Order Accuracy An improved FD-BPM was developed which is based on the generalized transmission line(GTL) equa-  

E-Print Network [OSTI]

FD-BPM for Optical Waveguide Structures with Second Order Accuracy R. Pregla An improved FD-BPMRHH) for discretized transverse fields E and H. This BPM is a wide angle algorithm and also full vectorial a second term on the right sides (for details see [3]). Usually, BPM algorithms are based on the wave

Jahns, Jürgen

279

Acceptance test procedure for SY Tank Farm replacement exhauster unit  

SciTech Connect (OSTI)

The proper functioning of a new 241-SY Tank Farm replacement exhauster will be acceptance tested, to establish operability and to provide an operational baseline for the equipment. During this test, a verification of all of the alarm and control circuits associated with the exhaust, which provide operating controls and/or signals to local and remote alarm/annunciator panels, shall be performed. Test signals for sensors that provide alarms, warnings, and/or interlocks will be applied to verify that alarm, warning, and interlock setpoints are correct. Alarm and warning lights, controls, and local and remote readouts for the exhauster will be verified to be adequate for proper operation of the exhauster. Testing per this procedure shall be conducted in two phases. The first phase of testing, to verify alarm, warning, and interlock setpoints primarily, will be performed in the MO-566 Fab Shop. The second phase of testing, to verify proper operation and acceptable interface with other tank farm systems, will be conducted after the exhauster and all associated support and monitoring equipment have been installed in the SY Tank Farm. The exhauster, which is mounted on a skid and which will eventually be located in the SY tank farm, receives input signals from a variety of sensors mounted on the skid and associated equipment. These sensors provide information such as: exhauster system inlet vacuum pressure; prefilter and HEPA filter differential pressures; exhaust stack sampler status; exhaust fan status; system status (running/shut down); and radiation monitoring systems status. The output of these sensors is transmitted to the exhauster annunciator panel where the signals are displayed and monitored for out-of-specification conditions.

Becken, G.W.

1994-12-16T23:59:59.000Z

280

Josephson junction-embedded transmission-line resonators: from Kerr medium to in-line transmon  

E-Print Network [OSTI]

We provide a general method to find the Hamiltonian of a linear circuit in the presence of a nonlinearity. Focussing on the case of a Josephson junction embedded in a transmission-line resonator, we solve for the normal modes of the system by taking into account exactly the effect of the quadratic (i.e. inductive) part of the Josephson potential. The nonlinearity is then found to lead to self and cross-Kerr effect, as well as beam-splitter type interactions between modes. By adjusting the parameters of the circuit, the Kerr coefficient K can be made to reach values that are weak (K \\kappa) or even very strong (K >> \\kappa) with respect to the photon-loss rate \\kappa. In the latter case, the resonator+junction circuit corresponds to an in-line version of the transmon. By replacing the single junction by a SQUID, the Kerr coefficient can be tuned in-situ, allowing for example the fast generation of Schr\\"odinger cat states of microwave light. Finally, we explore the maximal strength of qubit-resonator coupling...

Bourassa, J; Gambetta, Jay M; Blais, A

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

PROPERTIES OF ADHESIVES AND CPVC MATERIALS PROPOSED FOR STEEL TANK LINING  

E-Print Network [OSTI]

1 PROPERTIES OF ADHESIVES AND CPVC MATERIALS PROPOSED FOR STEEL TANK LINING T. K. HASSAN Department on the behavior of structural adhesives used in tank lining applications. The experimental program addresses. The overall composite behavior of the proposed lining for steel tanks was investigated using three small

282

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc  

E-Print Network [OSTI]

Policies, Procedures and Guidelines Duplicate and Replacement Parchments Diplomas and Certificates Procedures1.doc.doc Complete Policy Title: Duplicate and Replacement Parchments, Diplomas and Certificates Procedures Policy Number (if applicable): Approved by: Senate Date of Most Recent Approval: March 14, 2007

Haykin, Simon

283

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for all replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new

284

Frequently Asked Questions: If I lose my permit, how can I get a replacement?  

E-Print Network [OSTI]

Frequently Asked Questions: If I lose my permit, how can I get a replacement? · A $25 fee will be charged for replacement parking permits. Will I be able to change from my current permit type to another permit type during the semester? · You may change your permit type at the beginning of a new semester

285

A Polynomial-Time Nuclear Vector Replacement Algorithm for Automated NMR Resonance Assignments  

E-Print Network [OSTI]

A Polynomial-Time Nuclear Vector Replacement Algorithm for Automated NMR Resonance Assignments and refinement. A new algorithm, called Nuclear Vector Replacement (NVR) is introduced to compute assignments be acquired in a fraction of the time needed to record the traditional suite of ex- periments used to perform

Lilien, Ryan

286

Energy Policy 29 (2001) 11331143 Ethanol as a lead replacement: phasing out leaded gasoline in Africa  

E-Print Network [OSTI]

Energy Policy 29 (2001) 1133­1143 Ethanol as a lead replacement: phasing out leaded gasoline cost of lead additives and of gasoline, and the falling cost of ethanol and sugarcane, have created sugarcane is produced in Africa to replace all the lead used in African gasoline; this would require Africa

Thomas, Valerie

287

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4  

E-Print Network [OSTI]

Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4 Revised: 12/10/2012 OMB Control No. 0648-0272 Expiration Date: 11/30/2015 APPLICATION FOR REPLACEMENT OF CERTIFICATES Person ID: 3. Business Mailing Address: [ ] Permanent or [ ] Temporary 4. Date of Birth or Date

288

Mercury Thermometer Replacement Alternatives Thermometer Description Non-Mercury Non-Mercury Non-Mercury  

E-Print Network [OSTI]

Mercury Thermometer Replacement Alternatives Length Thermometer Description Non-Mercury Non-Mercury Non-Mercury Range / Division VWR-Enviro-Safe® Fisherbrand® Brooklyn Thermometer Company Inc. Total/A #12;Mercury Thermometer Replacement Alternatives Length Thermometer Description Non-Mercury Non

289

Conceptual Design for Replacement of the DTL and CCL with Superconducting RF Cavities in the Spallation Neutron Source Linac  

SciTech Connect (OSTI)

The Spallation Neutron Source Linac utilizes normal conducting RF cavities in the low energy section from 2.5 MeV to 186 MeV. Six Drift Tube Linac (DTL) structures accelerate the beam to 87 MeV, and four Coupled Cavity Linac (CCL) structures provide further acceleration to 186 MeV. The remainder of the Linac is comprised of 81 superconducting cavities packaged in 23 cryomodules to provide final beam energy of approximately 1 GeV. The superconducting Linac has proven to be substantially more reliable than the normal conducting Linac despite the greater number of stations and the complexity associated with the cryogenic plant and distribution. A conceptual design has been initiated on a replacement of the DTL and CCL with superconducting RF cavities. The motivation, constraints, and conceptual design are presented.

Champion, Mark S [ORNL] [ORNL; Doleans, Marc [ORNL] [ORNL; Kim, Sang-Ho [ORNL] [ORNL

2013-01-01T23:59:59.000Z

290

Underground waste barrier structure  

DOE Patents [OSTI]

Disclosed is an underground waste barrier structure that consists of waste material, a first container formed of activated carbonaceous material enclosing the waste material, a second container formed of zeolite enclosing the first container, and clay covering the second container. The underground waste barrier structure is constructed by forming a recessed area within the earth, lining the recessed area with a layer of clay, lining the clay with a layer of zeolite, lining the zeolite with a layer of activated carbonaceous material, placing the waste material within the lined recessed area, forming a ceiling over the waste material of a layer of activated carbonaceous material, a layer of zeolite, and a layer of clay, the layers in the ceiling cojoining with the respective layers forming the walls of the structure, and finally, covering the ceiling with earth.

Saha, Anuj J. (Hamburg, NY); Grant, David C. (Gibsonia, PA)

1988-01-01T23:59:59.000Z

291

Bipolar pulse forming line  

DOE Patents [OSTI]

A bipolar pulse forming transmission line module for linear induction accelerators having first, second, third, fourth, and fifth planar conductors which form an interleaved stack with dielectric layers between the conductors. Each conductor has a first end, and a second end adjacent an acceleration axis. The first and second planar conductors are connected to each other at the second ends, the fourth and fifth planar conductors are connected to each other at the second ends, and the first and fifth planar conductors are connected to each other at the first ends via a shorting plate adjacent the first ends. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short a high voltage from the first end of the third planar conductor to the first end of the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

Rhodes, Mark A. (Pleasanton, CA)

2008-10-21T23:59:59.000Z

292

Measurements of the Fermilab 200 MeV transfer line quadrupole magnets  

SciTech Connect (OSTI)

This report presents the results of measurements of two quadrupole magnets that are used in the 200 MeV transfer line. The measurements were performed to obtain data to evaluate the suitability of these magnets for use in a 400 MeV transfer line once the Linac Upgrade is complete. In order to provide a basis for comparison, data were obtained from Fermilab's Magnet Test Facility of measurements of magnets of similar size and strength that were built for the Loma Linda project. These Loma Linda magnets are possible replacements for the ones presently in the 200 MeV transfer line. The Fermilab Linac Upgrade includes the reconfiguration of the transfer line that runs from the linac to the booster in order to handle the higher beam energy. Nominally, the quadrupole strengths will need to be 1.5 times their current operating points. This report will use a value of 1.7 to allow a tuning range to account differences in geometry between the old and new lines. Another goal in the design of the new transfer line is to produce a non-steering line. A complaint about the current line is that steering results from any attempt to re-tune the line. 18 figs., 3 tabs.

Kroc, T.

1990-03-22T23:59:59.000Z

293

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project  

SciTech Connect (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

294

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project  

SciTech Connect (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

295

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project  

SciTech Connect (OSTI)

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

Noel Duckwitz

2011-06-01T23:59:59.000Z

296

Hydrothermal alteration in the EPF replacement wells, Olkaria Geothermal field, Kenya  

SciTech Connect (OSTI)

Olkaria Geothermal area is located in the central sector of the Kenya, Rift Valley. A 45MW Geothermal power station has been operational at Olkaria since 1985 supplied by 22 of the 26 wells drilled in the Eastern production field (EPF). Between 1988 and 1993, eight more wells referred to as {open_quote}replacement wells{close_quote} were drilled in the same field to boost steam supply to the station. Petrographic analyses of the drill cuttings is usually done to determine detail stratigraphy of the field, extends of hydrothermal activity, subsurface structures and other parameters which may influence production potential of a well. Analyses of the drill cuttings from the EPF wells show that: Variations in the whole rock alteration intensities correlate with differences in rocktypes. Permeable horizons, especially the productive feeder zones are well marked by enhanced hydrothermal minerals depositions, mainly quartz, calcite, pyrite and epidote. Other aspects of state of reservoir like boiling are signified by presence of bladed calcite.

Mungania, J. [Kenya Power & Lighting Co. Ltd., Naivasha (Kenya)

1996-12-31T23:59:59.000Z

297

[NeII] emission line profiles from photoevaporative disc winds  

E-Print Network [OSTI]

I model profiles of the [NeII] forbidden emission line at 12.81um, emitted by photoevaporative winds from discs around young, solar-mass stars. The predicted line luminosities (~ 1E-6 Lsun) are consistent with recent data, and the line profiles vary significantly with disc inclination. Edge-on discs show broad (30-40km/s) double-peaked profiles, due to the rotation of the disc, while in face-on discs the structure of the wind results in a narrower line (~10km/s) and a significant blue-shift (5-10km/s). These results suggest that observations of [NeII] line profiles can provide a direct test of models of protoplanetary disc photoevaporation.

R. D. Alexander

2008-09-01T23:59:59.000Z

298

NETL LINES OF DEMARCATION 09282012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LINES OF DEMARCATION September 28, 2012 Contact: Site Operations Division or ESS&H Division with Questions The oversight, upkeep, and segregation of NETL infrastructure components,...

299

Vacancy-Induced Nanoscale Wire Structure in Gallium Selenide...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(nanowires) in the compound gallium selenide. In short, ordered lines of structural vacancies in the material stimulate the growth of "one-dimensional" structures less than 1...

300

Balmer Absorption Lines in FeLoBALs  

E-Print Network [OSTI]

We discovered non-stellar Balmer absorption lines in two many-narrow-trough FeLoBALs (mntBALs) by the near-infrared spectroscopy with Subaru/CISCO. Presence of the non-stellar Balmer absorption lines is known to date only in the Seyfert galaxy NGC 4151, thus our discovery is the first cases for quasars. Since all known active galactic nuclei with Balmer absorption lines share characteristics, it is suggested that there is a population of BAL quasars which have unique structures at their nuclei or unique evolutionary phase.

K. Aoki; I. Iwata; K. Ohta; N. Tamura; M. Ando; M. Akiyama; G. Kiuchi; K. Nakanishi

2006-12-14T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

302

Innovative Approach to Chiller Replacement at Lafayette General Medical Center Located in Lafayette, Louisiana  

E-Print Network [OSTI]

INNOVATIVE APPROACH TO CHILLER REPLACEMENT AT LAFAYETl'E GENERAL MEDICAL CENTER LOCATED IN LAFAYElTE, LOUISIANA James M. Pocbe*, P.E Mechanical EngineerIPresident Poche* Associates, Ltd. ABSTRACI' The rafavette General Medical Center is a 332... chillers. The Hospital had been monitoring the CFC issue for the past several years, and felt it was time to begin replacing its 30 year old machines. The Hospital's original plan at the time of budgeting was a one-forane replacement of chillers...

Poche', J. M.; Broussard, J. P.

1998-01-01T23:59:59.000Z

303

Agents for replacement of NAD+/NADH system in enzymatic reactions  

DOE Patents [OSTI]

Novel agents acting as co-factors for replacement of NAD(P).sup.+ /NAD(P)H co-enzyme systems in enzymatic oxido-reductive reactions. Agents mimicking the action of NAD(P).sup.+ /NAD(P)H system in enzymatic oxidation/reduction of substrates into reduced or oxidized products. A method for selection and preparation of the mimicking agents for replacement of NAD(P).sup.+ /NAD(P)H system and a device comprising co-factors for replacement of NAD(P).sup.+ /NAD(P)H system.

Fish, Richard H.; Kerr, John B.; Lo, Christine H.

2004-04-06T23:59:59.000Z

304

Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it!  

E-Print Network [OSTI]

Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact the ICE Office if you don't see a replacement part or kit component you need. We may have it! Item Description Price DNA Optical discount on these items.** #12;Other Materials: Replacement Parts, Manuals, Kit Components, etc. Contact

Evans, Paul G.

305

Transparent and Conductive Carbon Nanotube Multilayer Thin Films Suitable as an Indium Tin Oxide Replacement  

E-Print Network [OSTI]

Transparent electrodes made from metal oxides suffer from poor flexibility and durability. Highly transparent and electrically conductive thin films based on carbon nanotubes (CNTs) were assembled as a potential indium tin oxide (ITO) replacement...

Park, Yong Tae

2012-07-16T23:59:59.000Z

306

Drafty Windows: Is it Better to Insulate or Replace Them? | Department...  

Broader source: Energy.gov (indexed) [DOE]

expensive method is a simple window insulation kit, which includes a large sheet of plastic and double-sided tape; the most expensive (and most efficient) method is to replace...

307

Case Study Walnut Hill United Methodist Church - Dallas, Texas, Chiller Replacement Analysis  

E-Print Network [OSTI]

In March of 1992 Walnut Hill United Methodist Church in Dallas, Tx. decided that their existing thermal storage and electric reciprocating chiller system were both in need of replacement. After analyzing several options, they chose to install 150...

Phillips, J.

1998-01-01T23:59:59.000Z

308

Variation in joint fluid composition and its effect on the tribology of replacement joint articulation  

E-Print Network [OSTI]

Polyethylene wear is a significant clinical problem limiting the long-term survival of joint replacement prostheses, particularly in total hip arthroplasty (THA) and total knee arthroplasty (TKA). Although the tribology ...

Mazzucco, Daniel Clarke, 1976-

2003-01-01T23:59:59.000Z

309

Guideline for the seismic technical evaluation of replacement items for nuclear power plants  

SciTech Connect (OSTI)

Seismic qualification for equipment originally installed in nuclear power plants was typically performed by the original equipment suppliers or manufactures (OES/OEM). Many of the OES/OEM no longer maintain quality assurance programs with adequate controls for supplying nuclear equipment. Utilities themselves must provide reasonable assurance in the continued seismic adequacy of such replacement items. This guideline provides practical, cost-effective techniques which can be used to provide reasonable assurance that replacement items will meet seismic performance requirements necessary to maintain the seismic design basis of commercial nuclear power plants. It also provides a method for determining when a seismic technical evaluation of replacement items (STERI) is required as part of the procurement process for spare and replacement items. Guidance on supplier program requirements necessary to maintain continued seismic adequacy and on documentation of maintaining required seismic adequacy is also included.

Harris, S.P.; Cushing, R.W. (EQE International, San Francisco, CA (United States)); Johnson, H.W. (Programmatic Solutions, Smithtown, NY (United States)); Abeles, J.M. (System 1, Inc., Potomac, MD (United States))

1993-02-01T23:59:59.000Z

310

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

311

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

312

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

313

Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)  

SciTech Connect (OSTI)

Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

Not Available

2014-09-01T23:59:59.000Z

314

An Eye for an Eye: A Single Camera Gaze-Replacement Method The Blavatnik School of Computer Science  

E-Print Network [OSTI]

An Eye for an Eye: A Single Camera Gaze-Replacement Method Lior Wolf The Blavatnik School an effective so- lution to this problem that is based on replacing the eyes of the user. This replacement, when is asked to look straight at the camera. We store these frames,then track the eyes accurately in the video

Wolf, Lior

315

Abstract--Replacing open-heart surgical procedures with beating-heart interventions substantially decreases the trauma  

E-Print Network [OSTI]

Abstract-- Replacing open-heart surgical procedures with beating-heart interventions substantially on the beating heart is valve repair. To address this need, this paper proposes a tool for replacing mitral valve replacement and reduction of regurgitation was demonstrated in an ex-vivo heart simulator. I. INTRODUCTION UE

Dupont, Pierre

316

Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming Ouhyoung ( )  

E-Print Network [OSTI]

Image Based Face Replacement in Video Yu Liang ( ), Bing-Yu Chen ( ), Yung-Yu Chuang ( ), Ming In this paper, we present a practical and complete system for plausible face replacement of videos. In our system, we take two videos as inputs, and aim to replace the target human subject's face with an- other

Ouhyoung, Ming

317

CAGE TRIALS USING AN ENDOGENOUS MEIOTIC DRIVE GENE IN THE MOSQUITO AEDES AEGYPTI TO PROMOTE POPULATION REPLACEMENT  

E-Print Network [OSTI]

POPULATION REPLACEMENT SUNG-JAE CHA, AKIO MORI, DAVE D. CHADEE, AND DAVID W. SEVERSON* Center for Tropical, West Indies Abstract. Control of arthropod-borne diseases based on population replacement into natural populations. Endogenous meiotic drive systems have strong and stable population replacement

Severson, David

318

IEEE/ACM TRANSACTIONS ON NETWORKING, VOL. 10, NO. 4, AUGUST 2002 441 Efficient Randomized Web-Cache Replacement  

E-Print Network [OSTI]

-Cache Replacement Schemes Using Samples From Past Eviction Times Konstantinos Psounis, Student Member, IEEE, and Balaji Prabhakar, Member, IEEE Abstract--The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least

319

0-7803-7016-3/01/$10.00 2001 IEEE A Randomized Web-Cache Replacement Scheme  

E-Print Network [OSTI]

0-7803-7016-3/01/$10.00 ©2001 IEEE A Randomized Web-Cache Replacement Scheme Konstantinos Psounis@isl.stanford.edu Abstract-- The problem of document replacement in web caches has received much attention in recent research, and it has been shown that the eviction rule "replace the least recently used document" performs poorly

Prabhakar, Balaji

320

Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring  

E-Print Network [OSTI]

1 Title: Optimal Replacement in the Proportional Hazards Model with semi-Markovian Covariate Process and Continuous Monitoring Index terms--Optimal replacement, proportional hazards model, semi-Markov process, threshold replacement policy, sensitivity analysis SUMMARY This paper deals with the optimal

Ryan, Sarah M.

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P. Kharoufeh2 Lisa M. Maillart3  

E-Print Network [OSTI]

Optimal Replacement Policies Under Environment-Driven Degradation M. Yasin Ulukus1 Jeffrey P a stochastically degrading system using preventive and reactive replacements. The system's rate of degradation expected discounted cost of preventively and reactively replacing such a system over an infinite planning

Kharoufeh, Jeffrey P.

322

Improving Replacement Decisions in SetAssociative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg  

E-Print Network [OSTI]

Improving Replacement Decisions in Set­Associative Caches Zhenlin Wang Kathryn S. McKinley Arnold L. Rosenberg Computer Science Department, University of Massachusetts, Amherst ABSTRACT Cache replacement policies play a key role in determining hit rates in set­associative caches. Cache replacement algorithms

Massachusetts at Amherst, University of

323

UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond)  

E-Print Network [OSTI]

UNDERGRADUATE GRADE REPLACEMENT FORM (Applicable to All Students who Repeat an Approved Course During Fall 2010 and Beyond) STUDENT'S NAME STUDENT'S COLLEGE STUDENT'S UIN Under the Grade Replacement Policy for a repeated course, I request permission to replace the grade in the course listed below. I

Frank, Thomas D.

324

A periodic inspection and replacement policy for systems subject to competing failure modes due to degradation and traumatic events  

E-Print Network [OSTI]

A periodic inspection and replacement policy for systems subject to competing failure modes due-making. A condition-based periodic inspection/replacement policy is developed and compared with a benchmark time- based block replacement policy. Numerical results show that it is indeed useful to follow closely

Paris-Sud XI, Université de

325

Materials research and beam line operation utilizing NSLS. Progress report  

SciTech Connect (OSTI)

MATRIX, a participating research team of Midwest x-ray scattering specialists, continues to operate beam line X-18A at NSLS. Operations of this line now provides state-of-the-art capabilities to a wide range of people in the Materials Science and Engineering research community. Improvements of the beam line continue to be a focus of MATRIX. Throughout this past year the emphasis has been shifting towards improvement in ``user friendly`` aspects. Simplified control operations and a shift to single-user personal computer has been a major part of the effort. Over the past year all 232 operational days were fully utilized. Beam line tests coupled with MATRIX members combined to use 284 days. General user demand for use of the beam line continues to be strong and four groups were provided 48 operating days. Research production has been growing as NSLS and the beam line become a more stable type of operation. For 1992 the MATRIX group published six articles. To date, for 1993 the same group has published, submitted, or has in preparation nine articles. Recent research milestones include: the first quantitative structural information on the as-quenched and early stages of decomposition of supersaturated Al-Li alloys; the first quantitative diffuse scattering measurements on a complex system (Co substitute for Cu YBCO superconductor); demonstration of capabilities of a new UHV surface diffraction chamber with in-situ characterization and temperature control (30-1300K); feasibility of phasing structure factors in a quasicrystal using multiple Bragg scattering.

Liedl, G.L.

1993-06-01T23:59:59.000Z

326

Authorization of Line Extension (Nebraska)  

Broader source: Energy.gov [DOE]

Any entity permitted to establish an electric light and power plant, and/or transmission or distribution lines within a city, village, or public electric light and power district, may also extend...

327

Analysis of interconnect microstrip lines  

E-Print Network [OSTI]

of the return loss of the slot-coupled microstrip dipole. Section C presents two simulations of the return loss on the slot- coupled rectangular patch antenna. A. Interconnect of Microstrip Lines Several circuits with the geometry of Figure 1 were fabricated.... Experimental and Theoretical Results of the Interconnect Two circuits were designed and fabricated. Each circuit consists of two substrates as shown in Figure 9. One substrate has an open microstrip line etched in one side and an aperture etched...

Luong, Giam-Minh

1992-01-01T23:59:59.000Z

328

Fin-line horn antenna  

DOE Patents [OSTI]

A fin line circuit card containing a fin line slot feeds a dipole antenna ich extends a quarterwave outside the waveguide and provides an energy beam focal point at or near the open end of the waveguide. The dipole antenna thus maintains a wide and nearly constant beamwidth, low VSWR and a circular symmetric radiation pattern for use in electronic warfare direction finding and surveillance applications.

Reindel, John (San Diego, CA)

1990-01-01T23:59:59.000Z

329

Models of Forbidden Line Emission Profiles from Axisymmetric Stellar Winds  

E-Print Network [OSTI]

A number of strong infrared forbidden lines have been observed in several evolved Wolf-Rayet star winds, and these are important for deriving metal abundances and testing stellar evolution models. In addition, because these optically thin lines form at large radius in the wind, their resolved profiles carry an imprint of the asymptotic structure of the wind flow. This work presents model forbidden line profile shapes formed in axisymmetric winds. It is well-known that an optically thin emission line formed in a spherical wind expanding at constant velocity yields a flat-topped emission profile shape. Simulated forbidden lines are produced for a model stellar wind with an axisymmetric density distribution that treats the latitudinal ionization self-consistently and examines the influence of the ion stage on the profile shape. The resulting line profiles are symmetric about line centre. Within a given atomic species, profile shapes can vary between centrally peaked, doubly peaked, and approximately flat-topped in appearance depending on the ion stage (relative to the dominant ion) and viewing inclination. Although application to Wolf-Rayet star winds is emphasized, the concepts are also relevant to other classes of hot stars such as luminous blue variables and Be/B[e] stars.

Richard Ignace; Adam Brimeyer

2006-05-10T23:59:59.000Z

330

A STRUCTURAL INTEGRITY EVALUATION OF THE TANK FARM WASTE TRANSFER SYSTEM  

SciTech Connect (OSTI)

Radioactive supernate, salt, and/or sludge wastes (i.e., high level wastes) are confined in 49 underground storage tanks at the Savannah River Site (SRS). The waste is transported between tanks within and between the F and H area tank farms and other facilities on site via underground and a limited number of aboveground transfer lines. The Department of Energy - Savannah River Operations Office (DOE-SR) performed a comprehensive assessment of the structural integrity program for the Tank Farm waste transfer system at the SRS. This document addresses the following issues raised during the DOE assessment: (1) Inspections of failed or replaced transfer lines indicated that the wall thickness of some core and jacket piping is less than nominal; (2) No corrosion allowance is utilized in the transfer line structural qualification calculations. No basis for neglecting corrosion was provided in the calculations; (3) Wall loss due to erosion is not addressed in the transfer line structural qualification calculations; and (4) No basis is provided for neglecting intergranular stress corrosion cracking in the transfer line structural qualification calculations. The common theme in most of these issues is the need to assess the potential for occurrence of material degradation of the transfer line piping. The approach used to resolve these issues involved: (1) Review the design and specifications utilized to construct and fabricate the piping system; (2) Review degradation mechanisms for stainless steel and carbon steel and determine their relevance to the transfer line piping; (3) Review the transfer piping inspection data; (4) Life estimation calculations for the transfer lines; and (5) A Fitness-For-Service evaluation for one of the transfer line jackets. The evaluation concluded that the transfer line system piping has performed well for over fifty years. Although there have been instances of failures of the stainless steel core pipe during off-normal service, no significant degradation is anticipated during normal operations for the planned service life. General corrosion of stainless steel in high level waste environments was shown to be insignificant (i.e., little or no wall loss is expected for a time on the order of 180 years or more). Erosion is also not expected to limit the life of the pipes due to the low usage of the transfer lines and low fluid velocity during transfers. Quality controls on the material (e.g., corrosion evaluation testing) and procedures/specifications that limit contact with chloride bearing materials or liquids minimize the potential for the occurrence of stress corrosion cracking of the core pipe. General corrosion of the carbon steel jacket is not expected to be significant for a reasonable intended service life (e.g., on the order of 170 years). However, the carbon steel jackets are expected to continue to fail in local areas due to pitting corrosion. Life prediction estimates project that a significant increase in the number of jacket failures (i.e., through-wall penetrations) may occur after an additional 30 to 60 years of service life (i.e., between 2035 and 2065). A Fitness-For-Service evaluation was performed for a recently inspected jacket that showed evidence of pitting within a locally thinned area. The evaluation concluded that the line is still able to perform its intended function and can remain in service.

Wiersma, B.

2006-03-09T23:59:59.000Z

331

10 CFR 830 Major Modification Determination for Emergency Firewater Injection System Replacement  

SciTech Connect (OSTI)

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent sub-projects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the fifty year old antiquated marine diesels with commercial power that is backed with safety-related emergency diesel generators (EDGs), switchgear, and uninterruptible power supply. The second project will replace the four, obsolete, original primary coolant pumps and motors. The third project, the subject of this major modification determination, will replace the current emergency firewater injection system (EFIS). The replacement water injection system will function as the primary emergency water injection system with the EFIS being retained as a defense-in-depth backup. Completion of this and the two other age-related projects (replacement of the ATR diesel bus (E-3) and switchgear and replacement of the existent aged primary coolant pumps and motors) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification.

Noel Duckwitz

2011-05-01T23:59:59.000Z

332

Florida Electric Transmission Line Siting Act (Florida)  

Broader source: Energy.gov [DOE]

The Transmission Line Siting Act (TLSA) is the state’s centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15...

333

What can emission lines tell us?  

E-Print Network [OSTI]

1 Generalities 2 Empirical diagnostics based on emission lines 3 Photoionization modelling 4 Pending questions 5 Appendix: Lists of useful lines and how to deal with them

G. Stasinska

2007-04-03T23:59:59.000Z

334

Objective determination of optimal power line designs.  

E-Print Network [OSTI]

??Includes abstract. The thesis investigated the possibility of overhead power line designs being decided by using an objective rather thana subjective method. Power lines are… (more)

Stephen, Robert G.

2010-01-01T23:59:59.000Z

335

Regular electrically charged structures in Nonlinear Electrodynamics coupled to General Relativity  

E-Print Network [OSTI]

We address the question of existence of regular spherically symmetric electrically charged solutions in Nonlinear Electrodynamics coupled to General Relativity. Stress-energy tensor of the electromagnetic field has the algebraic structure $T_0^0=T_1^1$. In this case the Weak Energy Condition leads to the de Sitter asymptotic at approaching a regular center. In de Sitter center of an electrically charged NED structure, electric field, geometry and stress-energy tensor are regular without Maxwell limit which is replaced by de Sitter limit: energy density of a field is maximal and gives an effective cut-off on self-energy density, produced by NED coupled to gravity and related to cosmological constant $\\Lambda$. Regular electric solutions satisfying WEC, suffer from one cusp in the Lagrangian ${\\cal L}(F)$, which creates the problem in an effective geometry whose geodesics are world lines of NED photons. We investigate propagation of photons and show that their world lines never terminate which suggests absence of singularities in the effective geometry. To illustrate these results we present the new exact analytic spherically symmetric electric solution with the de Sitter center.

Irina Dymnikova

2004-08-19T23:59:59.000Z

336

Word aligned bitmap compression method, data structure, and apparatus  

DOE Patents [OSTI]

The Word-Aligned Hybrid (WAH) bitmap compression method and data structure is a relatively efficient method for searching and performing logical, counting, and pattern location operations upon large datasets. The technique is comprised of a data structure and methods that are optimized for computational efficiency by using the WAH compression method, which typically takes advantage of the target computing system's native word length. WAH is particularly apropos to infrequently varying databases, including those found in the on-line analytical processing (OLAP) industry, due to the increased computational efficiency of the WAH compressed bitmap index. Some commercial database products already include some version of a bitmap index, which could possibly be replaced by the WAH bitmap compression techniques for potentially increased operation speed, as well as increased efficiencies in constructing compressed bitmaps. Combined together, this technique may be particularly useful for real-time business intelligence. Additional WAH applications may include scientific modeling, such as climate and combustion simulations, to minimize search time for analysis and subsequent data visualization.

Wu, Kesheng; Shoshani, Arie; Otoo, Ekow

2004-12-14T23:59:59.000Z

337

Structural Dependence of Grain Boundary Resistance in Copper Nanowires  

SciTech Connect (OSTI)

The current choice of the interconnect metal in integrated circuits is copper due to its higher electrical conductivity and improved electromigration reliability in comparison with aluminum. However, with reducing feature sizes, the resistance of copper interconnects (lines) increases dramatically. Greater resistance will result in higher energy use, more heat generation, more failure due to electromigration, and slower switching speeds. To keep pace with the projected planar transistor density, the first challenge is to identify the dominant factors that contribute to the high interconnect resistance. Here we directly measure individual grain boundary (GB) resistances in copper nanowires with a one-to-one correspondence to the GB structure. The specific resistivities of particular GBs are measured using four-probe scanning tunneling microscopy (STM) to establish a direct link between GB structure and the resistance. High-angle random GBs contribute to a specific resistivity of about 25 10-12 cm2 for each boundary, while coincidence boundaries are significantly less-resistive than random boundaries. Thus, replacing random boundaries with coincidence ones would be a route to suppress the GB impact to the resistivity of polycrystalline conductors. Acknowledgement: The research was supported by the Division of Scientific User Facilities, U. S. Department of Energy.

Kim, Tae Hwan [ORNL; Zhang, Xiaoguang [ORNL; Nicholson, Don M [ORNL; Radhakrishnan, Bala [ORNL; Radhakrishnan, Balasubramaniam [ORNL; Evans III, Boyd Mccutchen [ORNL; Kulkarni, Nagraj S [ORNL; Kenik, Edward A [ORNL; Meyer III, Harry M [ORNL; Li, An-Ping [ORNL

2011-01-01T23:59:59.000Z

338

Minimizing Simultaneous Switching Noise at Reduced Power with Constant-Voltage Power Transmission Lines for High-Speed Signaling  

E-Print Network [OSTI]

plane structure with a power transmission line (PTL). In this paper, a new power delivery scheme called Constant Voltage Power Transmission Line (CV-PTL) is shown to significantly reduce switching noise while, and measurements. Keywords Power delivery network, simultaneous switching noise, power transmission line 1

Swaminathan, Madhavan

339

BC-MM-792%20NEPA,%20Replace%20BC%2016%20inch%20B-Spec%20Crude...  

Broader source: Energy.gov (indexed) [DOE]

792 Title: Replace BC 16" B-Spec Crude Oil Header Piping Description: Subcontractor shall furnish all labor, tools, materials, equipment, and supervision required to replace the...

340

Quasistellar Objects: Intervening Absorption Lines  

E-Print Network [OSTI]

We briefly review, at a level appropriate for graduate students and non-specialists, the field of quasar absorption lines (QALs). Emphasis is on the intervening absorbers. We present the anatomy of a quasar spectrum due to various classes of intervening absorption systems, and a brief historical review of each absorber class (Lyman-alpha forest and Lyman limit systems, and metal-line and damped Lyman-alpha absorbers). We also provide several heuristic examples on how the physical properties of both the intergalactic medium and the gaseous environments associated with earlier epoch galaxies can be inferred from QALs. The evolution of these environments from z=4 are discussed.

Jane C. Charlton; Christopher W. Churchill

2000-05-31T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Chemistry and line emission from evolving Herbig Ae disks  

E-Print Network [OSTI]

Aims: To calculate chemistry and gas temperature of evolving protoplanetary disks with decreasing mass or dust settling, and to explore the sensitivity of gas-phase tracers. Methods: The density and dust temperature profiles for a range of models of flaring and self-shadowed disks around a typical Herbig Ae star are used together with 2-dimensional ultraviolet (UV) radiative transfer to calculate the chemistry and gas temperature. In each model the line profiles and intensities for the fine structure lines of [O I], [C II] and [C I] and the pure rotational lines of CO, CN, HCN and HCO+ are determined. Results: The chemistry shows a strong correlation with disk mass. Molecules that are easily dissociated, like HCN, require high densities and large extinctions before they can become abundant. The products of photodissociation, like CN and C2H, become abundant in models with lower masses. Dust settling mainly affects the gas temperature, and thus high temperature tracers like the O and C+ fine structure lines. The carbon chemistry is found to be very sensitive to the adopted PAH abundance. The line ratios CO/13CO, CO/HCO+ and [O I] 63 um/146 um can be used to distinguish between disks where dust growth and settling takes place, and disks that undergo overall mass loss.

B. Jonkheid; C. P. Dullemond; M. R. Hogerheijde; E. F. van Dishoeck

2006-11-07T23:59:59.000Z

342

Structure and deformation mechanisms along the Tonale Line, n. Italy  

E-Print Network [OSTI]

and Jean Kiefer. Finally, I express my appreciation to my friend and husband, Jeffrey We1ker, who gave me strength and encouragement when I needed it the most. Financial support for this study was provided by U. S. G. S. research grants G-981 and 14...-axis pole figure of a concordant quartz vein from a Tonale Series mylonite. 38 15 Lower-hemi sphere, equal-area projections of normal s to fractures (Y) from the Tonale Series damaged zone. 46 16 Photomicrograph of a sample from the Tonale Series...

Welker, Mary Clare

1985-01-01T23:59:59.000Z

343

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

344

Insulation spacer eliminates electric shorts between lines  

SciTech Connect (OSTI)

The design criteria incorporated into the pipeline insulating spacer were: spacer material selected must have a very large compressive and tensile strength in order to withstand the weight and stress resulting on the pipelines; provide the necessary abrasive resistance, dielectric strength, and will not decay underground; must not soften with heat when used around or near stream lines or will not cold flow under pressure; minimum length and circumference to reduce ''Shielding Effects'' from any cathodic protection system; and provide a material that incorporates a maximum strength at a minimum thickness. Explains that electric shorts are caused by 2 or more metallic structures in contact with each other. Notes that the insulating spacer's use has been expanded to provide electrical and physical insulation between carrier pipe and casing, supports for piping in compressing stations, and for pipelines that are suspended on bridges.

Colaizzi, J.F.; Rockafellow, G.B.

1983-03-01T23:59:59.000Z

345

Full-wave analysis of superconducting microstrip lines on anisotropic substrates using equivalent surface impedance approach  

SciTech Connect (OSTI)

A computationally efficient full-wave technique is developed to analyze single and coupled superconducting microstrip lines on anisotropic substrates. The optic axis of the dielectric is in the plane of the substrate at an arbitrary angle with respect to the propagation direction. A dyadic Green's function for layered, anisotropic media is used to formulate an integral equation for the current in the strips. To increase the efficiency of the method, the superconducting strips are replaced by equivalent surface impedances which account for the loss and kinetic inductance of the superconductors. The validity of this equivalent surface impedance (ESI) approach is verified by comparing the calculated complex propagation constant and characteristic impedance for superconducting microstrip lines on an isotropic substrate to measured results, and to numerical results by the more rigorous volume-integral equation method. The results calculated using the ESI approach for perfectly conducting coupled lines on an anisotropic substrate agree with the results by the finite-difference time-domain method. This efficient ESI technique is then used to study the effects of the optic axis orientation and the strip width on the characteristics of single and coupled superconducting microstrip lines on M-plane sapphire. The effects of the line separation and operating temperature on the coupled lines are also investigated.

Lee, L.H.; Lyons, W.G.; Orlando, T.P.; Ali, S.M. (Massachusetts Inst. of Tech., Cambridge, MA (United States). Dept. of Electrical Engineering and Computer Science); Lyons, W.G. (Massachusetts Inst. of Tech., Lexington, MA (United States). Lincoln Lab.); Withers, R.S. (Conductus, Inc., Sunnyvale, CA (United States))

1993-12-01T23:59:59.000Z

346

Identification of ions near HVDC (high-voltage direct-current) transmission lines: Final report  

SciTech Connect (OSTI)

Positive and negative ion species were identified and studied at two separate field sites and one laboratory site. The first field study was conducted under an operating HVDC transmission line. The second was near a HVDC test line and measurements were performed with the line in both an energized and de-energized state. During clear, sunny days HSO/sub 4//sup /minus///center dot/H/sub 2/SO/sub 4/ was observed to be the dominant negative ion in the natural ion spectrum. At night, however, HSO/sub 4//sup /minus// core ions virtually disappeared, and were replaced by NO/sub 3//sup /minus// core ions and their first nitric acid cluster. Both negative spectra also typically contained lesser concentrations of the malonate ion. The transmission line negative spectra were similar but were typically dominated by the NO/sub 3//sup /minus// core ions during both day and night. The positive ions observed under HVDC lines were typically either NH/sub 4//sup +/ or C/sub 5/H/sub 6/N/sup +/, which reacted with higher proton affinity species (such as methylpyridines, trimethylamine and quinoline) farther from or in the absence of the transmission line. The observed differences between natural and anthropogenic ion spectra near HVDC lines are attributed primarily to a shortening of ion lifetimes by the strong electric field associated with the HVDC lines. One exception is the production of potassium and probably sodium based ions from the decomposition of insects in transmission line coronas. 22 refs., 29 figs.

Eisele, F.L.

1989-05-01T23:59:59.000Z

347

Exploring Aggregate Effect with Weighted Transcoding Graphs for Efficient Cache Replacement in Transcoding Proxies  

E-Print Network [OSTI]

Exploring Aggregate Effect with Weighted Transcoding Graphs for Efficient Cache Replacement University Taipei, Taiwan, ROC E-mail: {cychang@arbor.ee.ntu.edu.tw; mschen@cc.ee.ntu.edu.tw} Abstract This paper explores the aggregate effect when caching multiple versions of the same Web object

Chen, Ming-Syan

348

The Replacement Operation for CCP Programs Marco Bertolino 1 , Sandro Etalle 2 , and Catuscia Palamidessi 3  

E-Print Network [OSTI]

University catuscia@cse.psu.edu Abstract. The replacement is a very powerful transformation opera­ tion which common transformation operations such as unfold, fold, switching, distribution. Because of optimization techniques. To this end, while there exists a history and a wide literature on transformations

Palamidessi, Catuscia

349

Measure Guideline: Replacing Single-Speed Pool Pumps with Variable Speed Pumps for Energy Savings  

SciTech Connect (OSTI)

The report evaluates potential energy savings by replacing traditional single-speed pool pumps with variable speed pool pumps, and provide a basic cost comparison between continued uses of traditional pumps verses new pumps. A simple step-by-step process for inspecting the pool area and installing a new pool pump follows.

Hunt, A.; Easley, S.

2012-05-01T23:59:59.000Z

350

Toroidal field coil replacement study for the International Thermonuclear Experimental Reactor (ITER)  

SciTech Connect (OSTI)

The objective of this study is to develop an estimate of the time required to replace a failed toroidal field (TF) coil in the International Thermonuclear Experimental Reactor (ITER). This estimate is based on the current ITER design which resulted from the Conceptual Design Activities began in spring of 1988 and ending in December 1990. Although the TF Coils in ITER are designated permanent components and expected to last the life of the plant, the history of failures of large coils in fusion devices has prompted an assessment of the down time that might be required for replacement of a failed TF coil in ITER. The difficulty of replacement of a TF Coil in ITER is compounded by the large physical size of ITER, and the radiation fields which necessitate the use of remote handling equipment for most maintenance activities. Since 10 out of 16 TF coils are adjacent to either a Neutral Beam Injector (NBI) port or a remote handling (RH) port, it is probable that a failed TF Coil will be in one of these inconvenient locations. For this study, TF coil number 3 is assumed to fail and its replacement will be evaluated as a typical case. TF coil number 3 is located between a remote handling port ({number sign}3) and a port allocated to the lower hybrid ({number sign}4).

Not Available

1991-08-01T23:59:59.000Z

351

Toroidal field coil replacement study for the International Thermonuclear Experimental Reactor (ITER)  

SciTech Connect (OSTI)

The objective of this study is to develop an estimate of the time required to replace a failed toroidal field (TF) coil in the International Thermonuclear Experimental Reactor (ITER). This estimate is based on the current ITER design which resulted from the Conceptual Design Activities began in spring of 1988 and ending in December 1990. Although the TF Coils in ITER are designated permanent components and expected to last the life of the plant, the history of failures of large coils in fusion devices has prompted an assessment of the down time that might be required for replacement of a failed TF coil in ITER. The difficulty of replacement of a TF Coil in ITER is compounded by the large physical size of ITER, and the radiation fields which necessitate the use of remote handling equipment for most maintenance activities. Since 10 out of 16 TF coils are adjacent to either a Neutral Beam Injector (NBI) port or a remote handling (RH) port, it is probable that a failed TF Coil will be in one of these inconvenient locations. For this study, TF coil number 3 is assumed to fail and its replacement will be evaluated as a typical case. TF coil number 3 is located between a remote handling port ({number_sign}3) and a port allocated to the lower hybrid ({number_sign}4).

Not Available

1991-08-01T23:59:59.000Z

352

Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet data  

E-Print Network [OSTI]

1 Bus Fleet Type and Age Replacement Optimization: A case study utilizing King County Metro fleet and a hybrid bus. Employing real-world bus fleet data from King County Metro (Washington State, USA) multiple multiple fleets of buses with different types of buses serving different routes. For example, King County

Bertini, Robert L.

353

Can electricity from the human body replace batteries? by Anne-Marie Bullock for BBC News  

E-Print Network [OSTI]

Harnessing energy from the human body may only generate small amounts of electricity but scientists believeCan electricity from the human body replace batteries? by Anne-Marie Bullock for BBC News it has a wide range of potentially life-changing applications. Imagine clothes made with materials

South Bohemia, University of

354

Towards Reliable Scheduling Schemes for Long-lived Replaceable Sensor Networks  

E-Print Network [OSTI]

, including energy conservation [1], ambient energy harvesting [2]­[6], incremental deployment, and node reclamation and replacement [7], [8]. Energy conservation schemes can slow down energy con- sumption and thus. For example, the amount of energy that a solar cell can harvest is proportional to its surface area

Wang, Guiling

355

Analysis of the Repair vs. Replace Decision for Small AC Motors  

E-Print Network [OSTI]

This morning in the course of my discussion, I would like to cover how we at Westvaco were handling our motor replacement decisions, how we are handling them now and how we determined the costs and benefits of such a change. As you have already...

Chamberlain, P. F.

1984-01-01T23:59:59.000Z

356

Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage  

E-Print Network [OSTI]

1 Principles and Efficient Implementation of Charge Replacement in Hybrid Electrical Energy Storage--Hybrid electrical energy storage systems (HEES) are comprised of multiple banks of inhomogeneous EES elements storage device, i.e., high energy capacity, high output power level, low self-discharge, low cost

Pedram, Massoud

357

Managing Inventory of Items with Replacement Wei Huang Vidhyadhar Kulkarni 1  

E-Print Network [OSTI]

Managing Inventory of Items with Replacement Warranty Wei Huang Vidhyadhar Kulkarni 1 Jayashankar items under warranty. We model this setting as a multi-period single product inventory problem where that neglects warranty repairs. Keyword: Warranty, Inventory, Stochastic Demand, Information. 1 This work

Kulkarni, Vidyadhar G.

358

[Minor revisionposted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish a standard procedure for controlled access, securityOP 61.07 [Minor revision­posted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure employees required to perform operational #12;December 6, 2012 Page 2 OP 61.07 checks and maintenance

Rock, Chris

359

[Minor revisionposted 5/19/14 (replaces 1/27/11 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish standards for traffic and parking control devices to ensureOP 61.18 [Minor revision­posted 5/19/14 (replaces 1/27/11 edition)] Operating Policy and Procedure of Grounds Maintenance by August 1 of every year." b. The assistant vice president for operations

Rock, Chris

360

[Minor revisionposted 12/7/12 (replaces 2/18/11 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish standards and guidelines for the use and selectionOP 61.14 [Minor revision­posted 12/7/12 (replaces 2/18/11 edition)] Operating Policy and Procedure and issuance of keys, development of keying systems, standardization of hardware, and maintenance programs

Rock, Chris

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

[Minor revisionposted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish a standard procedure for locating exterior signsOP 61.22 [Minor revision­posted 4/3/14 (replaces 3/23/11 edition)] Operating Policy and Procedure approval, a Project Request (Attachment B, OP 61.28) will be forwarded to Operations Division Maintenance

Rock, Chris

362

Conformationally constrained farnesoid X receptor (FXR) agonists: Heteroaryl replacements of the naphthalene  

SciTech Connect (OSTI)

To improve on the drug properties of GSK8062 1b, a series of heteroaryl bicyclic naphthalene replacements were prepared. The quinoline 1c was an equipotent FXR agonist with improved drug developability parameters relative to 1b. In addition, analog 1c lowered body weight gain and serum glucose in a DIO mouse model of diabetes.

Bass, Jonathan Y.; Caravella, Justin A.; Chen, Lihong; Creech, Katrina L.; Deaton, David N.; Madauss, Kevin P.; Marr, Harry B.; McFadyen, Robert B.; Miller, Aaron B.; Mills, Wendy Y.; Navas, III, Frank; Parks, Derek J.; Smalley, Jr., Terrence L.; Spearing, Paul K.; Todd, Dan; Williams, Shawn P.; Wisely, G. Bruce (GSKNC)

2014-08-13T23:59:59.000Z

363

GREEN LIVING Replace incandencent and halogen light bulbs with LED and CLFs  

E-Print Network [OSTI]

GREEN LIVING GUIDE ENERGY TRAVEL FOOD sustain yosef WATER Replace incandencent and halogen light for your laundry RESIST THAT SWITCH! Use natural light during the day, and no lights when you are gone USE MORE THAN YOU CAN EAT, reduce your waste stream DRINK FAIR TRADE COFFEE - Check out Conrad

Thaxton, Christopher S.

364

Survival of Bundleless Hair Cells and Subsequent Bundle Replacement in the Bullfrog's Saccule  

E-Print Network [OSTI]

Survival of Bundleless Hair Cells and Subsequent Bundle Replacement in the Bullfrog's Saccule and balance depend upon hair cells, the sensory receptors of the inner ear. Millions of people suffer from hearing and balance deficits caused by damage to hair cells as a result of exposure to noise

365

Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after  

E-Print Network [OSTI]

Development/Plasticity/Repair Hair Cell Replacement in Adult Mouse Utricles after Targeted Ablation of Hair Cells with Diphtheria Toxin Justin S. Golub,1 Ling Tong,1 Tot B. Ngyuen,1 Cliff R. Hume,1 Richard developed a transgenic mouse to permit conditional and selective ablation of hair cells in the adult mouse

Rubel, Edwin

366

Recycled brake linings as partial aggregate substitute in asphalt paving. Construction and final report. Report for July 1992-August 1996  

SciTech Connect (OSTI)

The purpose of this project was to evaluate the performance of asphalt containing various percentages of brake lining as an aggregate, and compare its performance to that of normal asphalt containing natural aggregate. This project is an effort to explore alternate ways to use waste product. Four test section of FB-2 Modified mix containing brake lining materials were placed in July 1992 along with one control section on SR 3022 in Mercer county. To date all sections are performing satisfactory, and Brake linings should be recommended as a viable partial replacement of aggregate in bituminous materials. This study only considered the performance of only off-spec brake linings, therefore, any performance data or enviromental effects of placement of used brake material should be addressed.

Miller, P.A.; Sukley, R.

1996-09-01T23:59:59.000Z

367

Parchment Replacement Form The parchment will be mailed out in a cardboard envelope to the address listed below after the form and payment have been received.  

E-Print Network [OSTI]

Parchment Replacement Form The parchment will be mailed out in a cardboard envelope to the address listed below after the form and payment have been received. Note: The replacement diploma is produced with a replacement note on the reverse side. There is a fee of $50 for a replacement parchment. DELIVERY INSTRUCTIONS

Saskatchewan, University of

368

The MICE Muon Beam Line  

SciTech Connect (OSTI)

In the Muon Ionization Cooling Experiment (MICE) at RAL, muons are produced and transported in a dedicated beam line connecting the production point (target) to the cooling channel. We discuss the main features of the beamline, meant to provide muons with momenta between 140 MeV/c and 240 MeV/c and emittances up to 10 mm rad, which is accomplished by means of a diffuser. Matching procedures to the MICE cooling channel are also described. In summer 2010 we performed an intense data taking campaign to finalize the calibration of the MICE Particle Identification (PID) detectors and the understanding of the beam line, which completes the STEPI phase of MICE. We highlight the main results from these data.

Apollonio, Marco [High Energy Physics Group, Department of Physics, Imperial College London SW7 2AZ (United Kingdom)

2011-10-06T23:59:59.000Z

369

Energy flow lines as light paths a didactical analysis  

E-Print Network [OSTI]

Analyses of interviews with secondary school students about their conceptions of light at the University of Potsdam indicate that numerous students have a deterministic view of light. With regard to these results the model of energy flow lines, which has been discussed recently in the didactical literature, is of special interest. Following this model, light is presumed to move along energy flow lines as trajectories. In an analysis of the model of energy flow lines four didactical dimensions (didactical content, internal structure, present-day relevance and future significance) are investigated. It can be shown that a discussion of this model in physics at school can increase the meta-conceptional knowledge of the students about the models of light. On the other hand, this can promote deterministic conceptions and the Bohm interpretation of quantum mechanics. But the question remains: Should the nature of light really be described as deterministic?

Horn, M E

2006-01-01T23:59:59.000Z

370

In-line thermoelectric module  

DOE Patents [OSTI]

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions may be perpendicular to the direction of current flow through the module.

Pento, Robert (Algonquin, IL); Marks, James E. (Glenville, NY); Staffanson, Clifford D. (S. Glens Falls, NY)

2000-01-01T23:59:59.000Z

371

In-Line Thermoelectric Module  

SciTech Connect (OSTI)

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an-in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions maybe perpendicular to the direction-of current flow through the module.

Pento, Robert; Marks, James E.; Staffanson, Clifford D.

1998-07-28T23:59:59.000Z

372

CONSTRAINTS ON OH MEGAMASER EXCITATION FROM A SURVEY OF OH SATELLITE LINES  

SciTech Connect (OSTI)

We report the results of a full-Stokes survey of all four 18 cm OH lines in 77 OH megamasers (OHMs) using the Arecibo Observatory. This is the first survey of OHMs that included observations of the OH satellite lines; only four of the 77 OHMs have existing satellite line observations in the literature. Satellite line emission is detected in five sources, three of which are redetections of previously published sources. The two sources with new detections of satellite line emission are IRAS F10173+0829, which was detected at 1720 MHz, and IRAS F15107+0724, for which both the 1612 MHz and 1720 MHz lines were detected. In IRAS F15107+0724, the satellite lines are partially conjugate, as 1720 MHz absorption and 1612 MHz emission have the same structure at some velocities within the source, along with additional broader 1612 MHz emission. This is the first observed example of conjugate satellite lines in an OHM. In the remaining sources, no satellite line emission is observed. The detections and upper limits are generally consistent with models of OHM emission in which all of the 18 cm OH lines have the same excitation temperature. There is no evidence for a significant population of strong satellite line emitters among OHMs.

McBride, James; Heiles, Carl [Department of Astronomy, University of California, Berkeley, CA 94720-3411 (United States); Elitzur, Moshe, E-mail: jmcbride@astro.berkeley.edu [Department of Physics and Astronomy, University of Kentucky, Lexington, KY 40506-0055 (United States)

2013-09-01T23:59:59.000Z

373

Microsoft Word - CX-FY10_Kalispell_District_Wood_Pole_Replacement...  

Broader source: Energy.gov (indexed) [DOE]

suitable for a facility to be used for its designed purpose. Location: Various transmission lines located within the Kalispell District in Montana. See Project Location...

374

Glass transition line in C60: a mode-coupling/molecular-dynamics study  

E-Print Network [OSTI]

We report a study of the mode-coupling theory (MCT) glass transition line for the Girifalco model of C60 fullerene. The equilibrium static structure factor of the model, the only required input for the MCT calculations, is provided by molecular dynamics simulations. The glass transition line develops inside the metastable liquid-solid coexistence region and extends down in temperature, terminating on the liquid sideof the metastable portion of the liquid-vapor binodal. The vitrification locus does not show re-entrant behavior. A comparison with previous computer simulation estimates of the location of the glass line suggests that the theory accurately reproduces the shape of the arrest line in the density-temperature plane. The theoretical HNC and MHNC structure factors (and consequently the corresponding MCT glass line) compare well with the numerical counterpart. These evidences confirm the conclusion drawn in previous works about the existence of a glassy phase for the fullerene model at issue.

D. Costa; R. Ruberto; F. Sciortino; M. C. Abramo; C. Caccamo

2007-03-22T23:59:59.000Z

375

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 A Biomimetic, 4.5W, 120+dB, Log-domain  

E-Print Network [OSTI]

College London, South Kensington Campus SW7 2AZ UK (phone: +44 (0)20 7594 5182; fax: +44 (0)20 7584 6897

Tomkins, Andrew

376

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--In this paper, we present a modeling and simulation  

E-Print Network [OSTI]

- dependent wind power output of a wind turbine generator (WTG) using its power curve [7]. For load demand, the hourly load fluctuations are modeled using the chronological annual load curve of the IEEE Reliability-values and prediction intervals (PIs) of the wind power and load. The output of the assessment is given in terms

Paris-Sud XI, Université de

377

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--When the Signal-to-Noise Ratio (SNR) falls below  

E-Print Network [OSTI]

of outliers. The proposed method employs a bank of phase-shifted unmatched filters for generating multiple that are done by a mobile robotic sensor with limited autonomous power source (a battery) [23]. Moreover

Intrator, Nathan

378

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--This paper presents techniques to reduce energy  

E-Print Network [OSTI]

energy, they also introduce errors that affect the performance quality. To compensate for these errors reduction and dynamic reduction for Discrete Cosine Transform shows, on average, 33% to 46% reduction overhead and achieve significant energy reduction with little quality degradation. Index Terms--low-power

Kambhampati, Subbarao

379

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 An Analytical Framework for Short-Term Resource  

E-Print Network [OSTI]

markets, strategic behavior, capacity gaming. I. INTRODUCTION HE electric system is said to be reliable markets, is capacity. Since sellers need not offer all their capacity to serve the demand, they may engage An Analytical Framework for Short-Term Resource Adequacy in Competitive Electricity Markets Pablo A. Ruiz

380

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--This paper presents Single Electron Transistor  

E-Print Network [OSTI]

low energy circuits. By discussing the energy-delay trade- offs for SET devices and comparing them Efficient, Single Electron Transistor, Energy-Delay Trade-Off I. INTRODUCTION TTAINING low energy operation option to implement low energy consumption circuits with low- to-moderate performance requirements

Yener, Aylin

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--Streptococcus mutans (S. mutans) bacteria were  

E-Print Network [OSTI]

that was plated onto the surface of an agar nutrient in a Petri dish. S. mutans is the most important. With appropriately designed electrodes, power supply and gas supply, an atmospheric-pressure glow discharge can, and a dielectric barrier on the electrodes. The device studied here has most of these features. Our "plasma needle

Goree, John

382

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--This paper examines how, in their attempts to  

E-Print Network [OSTI]

--e-governance, India, state, public-private partnerships I. INTRODUCTION "Paying an electricity bill [in India] could electricity bill payment and issuance of government certificates and forms. The article drew attention. It is a public private partnership between the Government of AP and private service providers. It provides

Sanders, Seth

383

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--In this letter, a novel linear frequency-domain  

E-Print Network [OSTI]

--In this letter, a novel linear frequency-domain compensation (FDC) of the resonant cavity light emitting diode emitting diodes (RC-LED) have been largely adopted in POF communications with on-off-keying modulation insensitivity, which are extremely suitable for optical home networking [2]. The low-cost resonant cavity light

Paris-Sud XI, Université de

384

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--With the evolving technological development of  

E-Print Network [OSTI]

, aeronautics, or electrical supplier applications, must ensure nominal functionality throughout the minimum exploitation duration (ten to thirty years) [1]-[2]. Hence qualification tests are required to check interference risks at system level [3]. However, EMC qualifications are often carried out on only one burn

Paris-Sud XI, Université de

385

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Single-Chip Wavelength Conversion Using a  

E-Print Network [OSTI]

wavelength conversion. The InP-InGaAsP offset quantum-well shallow- ridge technology platform has been shown been thinned, and individual bars SGDBRSOA EAM PINSOA Receiver RLoad Transmitter in out InP/InGaAsP to 10 GHz. Index Terms-- Electro-absorption modulators (EAMs), offset quantum well, sampled grating

Coldren, Larry A.

386

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--In high current, high voltage, high temperature  

E-Print Network [OSTI]

and high current applications, such as HVDC transmission [1] or pulsed power application [2], a thyristor

Paris-Sud XI, Université de

387

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) Abstract--Objectives of technical courses are knowledge and  

E-Print Network [OSTI]

advanced control applied to classical systems like the inverted pendulum [6]. On the other hand, only few level, it is proposed to modify the level of automation. For that, the functional dimension by the teacher by the mean of a functional analysis of the system. In order to validate the approach

Paris-Sud XI, Université de

388

> REPLACE THIS LINE WITH YOUR PAPER IDENTIFICATION NUMBER (DOUBLE-CLICK HERE TO EDIT) < 1 Abstract--A new architecture for a CMOS image sensor is  

E-Print Network [OSTI]

as decreasing communication costs. CMOS image sensors are particularly attractive because of their low cost enhancement is greatest towards the central rings in a fovea- like arrangement. Index Terms-- CMOS image and standard fabrication process which has made it the primary choice for applications such as videophones

Hornsey, Richard

389

COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer  

E-Print Network [OSTI]

COMPUTER REPLACEMENT PROGRAM ELIGIBILITY: Faculty who are in good standing in their department are eligible to apply for a computer replacement up to $1,300. The funding will be approved only if the faculty member has not purchased a computer with start-up, research, FRAP or other funds (including Computer

Qian, Ning

390

Mud return line connector apparatus  

SciTech Connect (OSTI)

The preferred and illustrated embodiment is a connector adapted to be joined above a blowout preventer and below the rotary table of a drilling rig. It collects the annular flow of returned drilling mud and directs mud to an incorporated, radially directed connective nipple. It enables the blowout preventer to be adjusted in location relative to the drilling rig and further accommodates a variable level of drilling mud in the annular space. The radial nipple connects with a mud line extending at some radial direction with a slope causing the mud to flow by gravity from the annular space to remote located mud tanks.

Ward, B.N.

1981-07-07T23:59:59.000Z

391

Chromospheric Dynamics and Line Formation  

E-Print Network [OSTI]

The solar chromosphere is very dynamic, due to the presence of large amplitude hydrodynamic waves. Their propagation is affected by NLTE radiative transport in strong spectral lines, which can in turn be used to diagnose the dynamics of the chromosphere. We give a basic introduction into the equations of NLTE radiation hydrodynamics and describe how they are solved in current numerical simulations. The comparison with observation shows that one-dimensional codes can describe strong brightenings quite well, but the overall chromospheric dynamics appears to be governed by three-dimensional shock propagation.

R. Hammer; P. Ulmschneider

2007-07-14T23:59:59.000Z

392

SPEAR3 Beam Line Availability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -the Mid-Infrared0 ResourceAwards SAGE Awards ,#2446Smalln n u a l rBeam Line

393

Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment  

SciTech Connect (OSTI)

The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

Not Available

1992-09-01T23:59:59.000Z

394

Development of Replacements for Phoscoating Used in Forging, Extrusion and Metal Forming Processes  

SciTech Connect (OSTI)

Many forging, extrusion, heading and other metal forming processes use graphite-based lubricants, phosphate coatings, and other potentially hazardous or harmful substances to improve the tribology of the metal forming process. The application of phosphate-based coatings has long been studied to determine if other synthetic ''clean'' lubricants could provide the same degree of protection afforded by phoscoatings and its formulations. So far, none meets the cost and performance objectives provided by phoscoatings as a general aid to the metal forming industry. In as much as phoscoatings and graphite have replaced lead-based lubricants, the metal forming industry has had previous experience with a legislated requirement to change processes. However, without a proactive approach to phoscoating replacement, many metal forming processes could find themselves without a cost effective tribology material necessary for the metal forming process

Kerry Barnett

2003-03-01T23:59:59.000Z

395

Evaluation of replacement thread lubricants for red lead and graphite in mineral oil  

SciTech Connect (OSTI)

Eight commercially available thread lubricants were evaluated to determine the best replacement for Red Lead and Graphite in Mineral Oil (RLGMO). The evaluation included coefficient of friction testing, high temperature anti-seizing testing, room temperature anti-galling testing, chemical analysis for detrimental impurities, corrosion testing, off-gas testing, and a review of health and environmental factors. The coefficient of friction testing covered a wide variety of factors including stud, nut, and washer materials, sizes, manufacturing methods, surface coatings, surface finishes, applied loads, run-in cycles, and relubrication. Only one lubricant, Dow Corning Molykote P37, met all the criteria established for a replacement lubricant. It has a coefficient of friction range similar to RLGMO. Therefore, it can be substituted directly for RLGMO without changing the currently specified fastener torque values for the sizes, materials and conditions evaluated. Other lubricants did not perform as well as Molykote P37 in one or more test or evaluation categories.

Jungling, T.L.; Rauth, D.R.; Goldberg, D.

1998-04-30T23:59:59.000Z

396

Line Management Perspective: National Nuclear Security Administration...  

Broader source: Energy.gov (indexed) [DOE]

National Nuclear Security Administration (NNSA) Line Management Perspective: National Nuclear Security Administration (NNSA) Addthis Description Slide Presentation by Jim...

397

Title Line 2 Commercialization at the  

E-Print Network [OSTI]

-exclusive or exclusive license (royalty free or royalty bearing) ­ Researchers sign acknowledgment #12;Title Title Line 2

Czarnecki, Krzysztof

398

Refractory Lining Material Improves Gasifer Performance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

water GASIFICATION CHAMBER the ENERGY lab NATIONAL ENERGY TECHNOLOGY LABORATORY Technology Transfer Refractory Lining Material Improves Gasifier Performance Award Winning...

399

Methods of Using Existing Wire Lines (power lines, phone lines, internet lines) for Totally Secure Classical Communication Utilizing Kirchoff's Law and Johnson-like Noise  

E-Print Network [OSTI]

We outline some general solutions to use already existing and currently used wire lines, such as power lines, phone lines, internet lines, etc, for the unconditionally secure communication method based on Kirchoff's Law and Johnson-like Noise (KLJN). Two different methods are shown. One is based on filters used at single wires and the other one utilizes a common mode voltage superimposed on a three-phase powerline.

Laszlo B. Kish

2006-10-02T23:59:59.000Z

400

Replaces EIA-459B U.S. DEPARTMENT OF ENERGY FEDERAL ASSISTANCE MILESTONE PLAN  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Replacing the Whole BarrelTo Reduce U.S. Dependence on Oil | Department of  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement

402

Why Insertion Turbine Meters are Replacing Orifice Plates for Steam Flow Measurement  

E-Print Network [OSTI]

WHY INSERTION TURBINE MBTBRS A E REPLACING ORIFICE PLATES FOR STEAM FLOW MEASURE ENT J. J. Rusnak Engineering Measurements Company Longmont, Colorado ABSTRACT Flow measurement is a complex and application related discipline. It borders... to be instrumented quickly, economically and without dis rupting production; and further, these meters had to be accurate in order to be useful in making energy saving decisions. Thus, the entry of the insertion turbine meter for steam in 1975. Since then it has...

Rusnak, J. J.

1983-01-01T23:59:59.000Z

403

A PROTOTYPE FOUR INCH SHORT HYDRIDE (FISH) BED AS A REPLACEMENT TRITIUM STORAGE BED  

SciTech Connect (OSTI)

The Savannah River Site (SRS) tritium facilities have used 1st generation (Gen1) metal hydride storage bed assemblies with process vessels (PVs) fabricated from 3 inch nominal pipe size (NPS) pipe to hold up to 12.6 kg of LaNi{sub 4.25}Al{sub 0.75} metal hydride for tritium gas absorption, storage, and desorption for over 15 years. The 2nd generation (Gen2) of the bed design used the same NPS for the PV, but the added internal components produced a bed nominally 1.2 m long, and presented a significant challenge for heater cartridge replacement in a footprint limited glove-box. A prototype 3rd generation (Gen3) metal hydride storage bed has been designed and fabricated as a replacement candidate for the Gen2 storage bed. The prototype Gen3 bed uses a PV pipe diameter of 4 inch NPS so the bed length can be reduced below 0.7 m to facilitate heater cartridge replacement. For the Gen3 prototype bed, modeling results show increased absorption rates when using hydrides with lower absorption pressures. To improve absorption performance compared to the Gen2 beds, a LaNi{sub 4.15}Al{sub 0.85} material was procured and processed to obtain the desired pressure-composition-temperature (PCT) properties. Other bed design improvements are also presented.

Klein, J.; Estochen, E.; Shanahan, K.; Heung, L.

2011-02-23T23:59:59.000Z

404

Creating markets for new products to replace incandescent lamps: The international experience  

SciTech Connect (OSTI)

Since the summer of 1995, several organizations have been in pursuit of what many consider the Holy Grail of lighting technology--a low-cost, drop-in, energy-efficient replacement for the incandescent lamp. This paper summarizes the international experience in attempting to catalyze the commercialization of a mass-market, replacement product that could have major impact on residential lighting energy consumption in US and EU homes. The technology procurement effort was originally spearheaded by US Federal Government through a loose collaboration between the Department of Defense (DoD), the Environmental Protection Agency (EPA) and the Department of Energy (DOE). The DoD agreed to serve as the anchor buyer for a low-cost, drop-in replacement product for standard-sized light bulbs that provide at least 30 percent energy savings compared to traditional incandescent lamps. In parallel to the US effort, the International Energy Agency launched a co-operative technology procurement effort by assembling large buyers' groups in Finland, the Netherlands, Sweden, and the United Kingdom to pull a similar efficient lighting product into the European market. The lukewarm response from lamp manufacturers to these two technology procurement efforts illustrates the challenges of transforming residential lighting from incandescent to efficient lighting.

Rubinstein, F.; Borg, N.; Horowitz, N.; Narel, T.; Morehouse, E.T. Jr.

1998-07-01T23:59:59.000Z

405

Percutaneous Valve Replacement: Significance of Different Delivery Systems In Vitro and In Vivo  

SciTech Connect (OSTI)

Background and purpose. Percutaneous heart valve replacement is an exciting growing field in cardiovascular medicine yet still with some major problems. Only sophisticated improvement of the instruments could make it a real alternative to conventional surgery. Therefore, the aim of this study was to evaluate different delivery devices for percutaneous heart valve replacement in vitro and in vivo. Methods. A catheter prototype designed by our group, and two commercially available devices for the delivery of esophageal stents and aortic endoprostheses, were tested. After in vitro experiments, an ovine animal model of transfemoral pulmonary valve implantation was established using biological valved self-expanding stents. Only the delivery device for aortic endografts (Medtronic, Talent, Santa Rosa, CA, USA) allowed fast in vitro procedures without material fatigue. This device was chosen for the in vivo tests. Results. Technical success was achieved in 9 of 10 animals (90%). One animal died after perforation of the ventricular wall. Orthotopic pulmonary placement was performed in 6 animals and intentional supravalvular valved stent placement in 3 animals. Conclusions. An adequate in vitro model for this evolving field of interventional heart valve replacement is presented. Furthermore, the present study pinpoints the key characteristics that are mandatory for a delivery system in percutaneous pulmonary valve implantation. With regard to the delivery device's ductility observed during this 'venous' study, an approach to transfemoral aortic valve implantation seems feasible.

Attmann, Tim; Lutter, Georg, E-mail: lutter@kielheart.uni-kiel.de; Quaden, Rene [Christian Albrechts University of Kiel, Department of Cardiovascular Surgery, School of Medicine (Germany); Jahnke, Thomas [Christian Albrechts University of Kiel, Department of Radiology, School of Medicine (Germany); Rumberg, Kristin; Cremer, Jochen [Christian Albrechts University of Kiel, Department of Cardiovascular Surgery, School of Medicine (Germany); Muller-Hulsbeck, Stefan [Christian Albrechts University of Kiel, Department of Radiology, School of Medicine (Germany)

2006-06-15T23:59:59.000Z

406

Four cavity efficiency enhanced magnetically insulated line oscillator  

DOE Patents [OSTI]

A four cavity, efficient magnetically insulated line oscillator (C4-E MILO) having seven vanes and six cavities formed within a tube-like structure surrounding a cathode is disclosed. The C4-E MILO has a primary slow wave structure which is comprised of four vanes and the four cavities located near a microwave exit end of the tube-like structure. The primary slow wave structure is the four cavity portion of the magnetically insulated line oscillator (MILO). An RF choke is provided which is comprised of three of the vanes and two of the cavities. The RF choke is located near a pulsed power source portion of the tube-like structure surrounding the cathode. The RF choke increases feedback in the primary slow wave structure, prevents microwaves generated in the primary slow wave structure from propagating towards the pulsed power source and modifies downstream electron current so as to enhance microwave power generation. A beam dump/extractor is located at the exit end of the oscillator tube for extracting microwave power from the oscillator, and in conjunction with an RF extractor vane, which comprises the fourth vane of the primary slow wave structure (nearest the exit) having a larger gap radius than the other vanes of the primary SWS, comprises an RF extractor. Uninsulated electron flow is returned downstream towards the exit along an anode/beam dump region located between the beam dump/extractor and the exit where the RF is radiated at said RF extractor vane located near the exit and the uninsulated electron flow is disposed at the beam dump/extractor. 34 figs.

Lemke, R.W.; Clark, M.C.; Calico, S.E.

1998-04-21T23:59:59.000Z

407

Four cavity efficiency enhanced magnetically insulated line oscillator  

DOE Patents [OSTI]

A four cavity, efficient magnetically insulated line oscillator (C4-E MILO) having seven vanes and six cavities formed within a tube-like structure surrounding a cathode. The C4-E MILO has a primary slow wave structure which is comprised of four vanes and the four cavities located near a microwave exit end of the tube-like structure. The primary slow wave structure is the four cavity (C4) portion of the magnetically insulated line oscillator (MILO). An RF choke is provided which is comprised of three of the vanes and two of the cavities. The RF choke is located near a pulsed power source portion of the tube-like structure surrounding the cathode. The RF choke increases feedback in the primary slow wave structure, prevents microwaves generated in the primary slow wave structure from propagating towards the pulsed power source and modifies downstream electron current so as to enhance microwave power generation. A beam dump/extractor is located at the exit end of the oscillator tube for extracting microwave power from the oscillator, and in conjunction with an RF extractor vane, which comprises the fourth vane of the primary slow wave structure (nearest the exit) having a larger gap radius than the other vanes of the primary SWS, comprises an RF extractor. Uninsulated electron flow is returned downstream towards the exit along an anode/beam dump region located between the beam dump/extractor and the exit where the RF is radiated at said RF extractor vane located near the exit and the uninsulated electron flow is disposed at the beam dump/extractor.

Lemke, Raymond W. (Albuquerque, NM); Clark, Miles C. (Albuquerque, NM); Calico, Steve E. (Albuquerque, NM)

1998-04-21T23:59:59.000Z

408

Evaluation of cracking in the 241-AZ tank farm ventilation line at the Hanford Site  

SciTech Connect (OSTI)

In the period from April to October of 1988, a series of welding operations on the outside of the AZ Tank Farm ventilation line piping at the Hanford Site produced unexpected and repeated cracking of the austenitic stainless steel base metal and of a seam weld in the pipe. The ventilation line is fabricated from type 304L stainless steel pipe of 24 inch diameter and 0.25 inch wall thickness. The pipe was wrapped in polyethylene bubble wrap and buried approximately 12 feet below grade. Except for the time period between 1980 and 1987, impressed current cathodic protection has been applied to the pipe since its installation in 1974. The paper describes the history of the cracking of the pipe, the probable cracking mechanisms, and the recommended future action for repair/replacement of the pipe.

ANANTATMULA, R.P.

1999-10-20T23:59:59.000Z

409

Unsplit bipolar pulse forming line  

DOE Patents [OSTI]

A bipolar pulse forming transmission line module and system for linear induction accelerators having first, second, third, and fourth planar conductors which form a sequentially arranged interleaved stack having opposing first and second ends, with dielectric layers between the conductors. The first and second planar conductors are connected to each other at the first end, and the first and fourth planar conductors are connected to each other at the second end via a shorting plate. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short at the first end a high voltage from the third planar conductor to the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

Rhodes, Mark A. (Pleasanton, CA)

2011-05-24T23:59:59.000Z

410

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

411

Gamma-Ray Burst Lines  

E-Print Network [OSTI]

The evidence for spectral features in gamma-ray bursts is summarized. As a guide for evaluating the evidence, the properties of gamma-ray detectors and the methods of analyzing gamma-ray spectra are reviewed. In the 1980's, observations indicated that absorption features below 100 keV were present in a large fraction of bright gamma-ray bursts. There were also reports of emission features around 400 keV. During the 1990's the situation has become much less clear. A small fraction of bursts observed with BATSE have statistically significant low-energy features, but the reality of the features is suspect because in several cases the data of the BATSE detectors appear to be inconsistent. Furthermore, most of the possible features appear in emission rather than the expected absorption. Analysis of data from other instruments has either not been finalized or has not detected lines.

Michael S. Briggs

1999-10-20T23:59:59.000Z

412

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

413

Either side of a line  

E-Print Network [OSTI]

appeared, and then the ghost, the dog, Carl and Anita, and so forth. This didn?t happen in a linear fashion: there was a lot of jumping around, and starting over, and starting over again. The structure of the story emerged as the characters appeared...

White, Lowell Mick

2005-08-29T23:59:59.000Z

414

CX-008382: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Administration (Western) regularly inspects the structures that support our transmission lines and occasionally needs to replace structures that have failed these inspections....

415

10 CFR 830 Major Modification Determination for Replacement of ATR Primary Coolant Pumps and Motors  

SciTech Connect (OSTI)

The continued safe and reliable operation of the ATR is critical to the Department of Energy (DOE) Office of Nuclear Energy (NE) mission. While ATR is safely fulfilling current mission requirements, a variety of aging and obsolescence issues challenge ATR engineering and maintenance personnel’s capability to sustain ATR over the long term. First documented in a series of independent assessments, beginning with an OA Environmental Safety and Health Assessment conducted in 2003, the issues were validated in a detailed Material Condition Assessment (MCA) conducted as a part of the ATR Life Extension Program in 2007.Accordingly, near term replacement of aging and obsolescent original ATR equipment has become important to ensure ATR capability in support of NE’s long term national missions. To that end, a mission needs statement has been prepared for a non-major system acquisition which is comprised of three interdependent subprojects. The first project will replace the existent diesel-electrical bus (E-3), switchgear, and the 50-year-old obsolescent marine diesels with commercial power that is backed with safety related emergency diesel generators, switchgear, and uninterruptible power supply (UPS). The second project, the subject of this major modification determination, will replace the four, obsolete, original primary coolant pumps (PCPs) and motors. Completion of this and the two other age-related projects (replacement of the ATR diesel bus [E-3] and switchgear and replacement of the existent emergency firewater injection system) will resolve major age-related operational issues plus make a significant contribution in sustaining the ATR safety and reliability profile. The major modification criteria evaluation of the project pre-conceptual design identified several issues that lead to the conclusion that the project is a major modification: 1. Evaluation Criteria #3 (Change of existing process). The proposed strategy for equipping the replacement PCPs with VFDs and having the PCPs also function as ECPs will require significant safety basis changes requiring DOE approval. 2. Evaluation Criteria #4 (Use of new technology). The use of VFD and VFD “pump catcher” technology for the PCPs is not currently in use and has not been previously formally reviewed/approved by DOE for ATR. It is noted that VFD technology has several decades of commercial use and experience. However, the ATR probabilistic risk assessment will have to be updated, reflecting the changes for supplying ECP flows including VFD reliability, to confirm that the proposed activity maintains or reduces the CDF for the ATR. 3. Evaluation Criteria #5 (Create the need for new or revised safety SSCs). It is expected that the proposed activity will result in a revised list of safety-related SSCs. Specifically, as currently proposed, the existing ECPs will be deleted from the list. The PCPs and their associated components, picking up the ECP function, will be classified as safety-related active Seismic Category I.

Noel Duckwitz

2011-05-01T23:59:59.000Z

416

Presentation Title „ one line or two lines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for medical point07.06Nucleon Structure on aPVSim

417

10 CFR 830 Major Modification Determination for Advanced Test Reactor RDAS and LPCIS Replacement  

SciTech Connect (OSTI)

The replacement of the ATR Control Complex's obsolete computer based Reactor Data Acquisition System (RDAS) and its safety-related Lobe Power Calculation and Indication System (LPCIS) software application is vitally important to ensure the ATR remains available to support this national mission. The RDAS supports safe operation of the reactor by providing 'real-time' plant status information (indications and alarms) for use by the reactor operators via the Console Display System (CDS). The RDAS is a computer support system that acquires analog and digital information from various reactor and reactor support systems. The RDAS information is used to display quadrant and lobe powers via a display interface more user friendly than that provided by the recorders and the Control Room upright panels. RDAS provides input to the Nuclear Engineering ATR Surveillance Data System (ASUDAS) for fuel burn-up analysis and the production of cycle data for experiment sponsors and the generation of the Core Safety Assurance Package (CSAP). RDAS also archives and provides for retrieval of historical plant data which may be used for event reconstruction, data analysis, training and safety analysis. The RDAS, LPCIS and ASUDAS need to be replaced with state-of-the-art technology in order to eliminate problems of aged computer systems, and difficulty in obtaining software upgrades, spare parts, and technical support. The major modification criteria evaluation of the project design did not lead to the conclusion that the project is a major modification. The negative major modification determination is driven by the fact that the project requires a one-for-one equivalent replacement of existing systems that protects and maintains functional and operational requirements as credited in the safety basis.

David E. Korns

2012-05-01T23:59:59.000Z

418

Lumen Maintenance Testing of the Philips 60-Watt Replacement Lamp L Prize Entry  

SciTech Connect (OSTI)

This paper describes testing conducted to evaluate the Philips' L Prize award winning 60-watt LED replacement product's ability to meet the lifetime/lumen maintenance requirement of the competition, which was: "having 70 percent of the lumen value under subparagraph (A) [producing a luminous flux greater than 900 lumens] exceeding 25,000 hours under typical conditions expected in residential use." A custom test apparatus was designed and constructed for this testing and a statistical approach was developed for use in evaluating the test results. This will be the only publicly available, third-party data set of long-term LED product operation.

Gordon, Kelly L.; Hafen, Ryan P.; Hathaway, John E.; McCullough, Jeffrey J.

2012-09-01T23:59:59.000Z

419

Replaces DOE F 3530.1 5. HOW LONG IN PRESENT POSITION GRADE  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement of50.2

420

Replaces EIA-459C All Other Editions Are Obsolete OMB Control No.  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement 4600.4

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

A decision-making framework to determine the value of on-orbit servicing compared to replacement of space telescopes  

E-Print Network [OSTI]

The Hubble Space Telescope has demonstrated that on-orbit servicing can provide significant benefits for scientific space programs. Specifically, servicing missions can replace failed components to keep spacecraft operational, ...

Baldesarra, Mark

2007-01-01T23:59:59.000Z

422

Potential commercial application of a bi-layer bone-ligament regeneration scaffold to anterior cruciate ligament replacement  

E-Print Network [OSTI]

A business model was created in order to explore the commercial application of a bi-layer bone-ligament scaffold to the treatment of torn anterior cruciate ligaments (ACL) requiring replacement. The two main keys in producing ...

Li, Jessica C. (Jessica Ching-Yi)

2006-01-01T23:59:59.000Z

423

Replace Pressure-Reducing Valves with Backpressure Turbogenerators (International Fact Sheet), Energy Tips-Steam, Steam Tip Sheet #20c  

SciTech Connect (OSTI)

This English/Chinese ITP steam tip sheet on replacing pressure-reducing valves provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2010-10-01T23:59:59.000Z

424

Gamma-Ray Line Observations with RHESSI  

E-Print Network [OSTI]

The Reuven Ramaty High Energy Solar Spectroscopic Imager (RHESSI) has been observing gamma-ray lines from the Sun and the Galaxy since its launch in February 2002. Here I summarize the status of RHESSI observations of solar lines (nuclear de-excitation, neutron capture, and positron annihilation), the lines of $^{26}$Al and $^{60}$Fe from the inner Galaxy, and the search for positron annihilation in novae.

David M. Smith

2004-04-30T23:59:59.000Z

425

ARM: Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Millimeter Wave Cloud Radar (MMCR), replaces mmcrcal and mmcrmoments datastreams following C-40 processor upgrade of 2003.09.09

Widener, Kevin; Bharadwaj, Nitin; Johnson, Karen

426

Journal of the National Cancer Institute, Vol. 98, No. 18, September 20, 2006 ARTICLES 1311 Background: Unopposed estrogen replacement therapy is  

E-Print Network [OSTI]

Background: Unopposed estrogen replacement therapy is associated with increased risk of endometrial cancer replacement therapy use and SULT1A1*2 genotype: the SULT1A1*2 allele and long-term use of estrogen replacement OR = 3.85, 95% CI = 1.48 to 10.00) than that of the SULT1A1*2 allele and no estrogen replacement therapy

Pennsylvania, University of

427

Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final  

E-Print Network [OSTI]

TR-246 October 2003 Economic and Conservation Evaluation of Capital Renovation Projects: Brownsville Irrigation District – 72" and 48" Pipeline Replacing Main Canal – Final M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson... estimates of water-savings (i.e., seepage and evaporation) and the initial construction cost. Also, an engineering design change resulted in the east and west forks of the Main Canal being replaced with 48" instead of 54" pipeline. This Final document...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

428

Emergency Management Lines of Inquiry, April 2008  

Energy Savers [EERE]

Lines of Inquiry plansprotocols, interview facility managers and responders, and conduct facility walkdowns, as necessary. In : ment s and responsibilities for program...

429

DOE Sustainability Reporting Open Line Help Call  

Broader source: Energy.gov [DOE]

The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual sustainability reporting process. Representatives from the...

430

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

431

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

432

On the Velocity and Intensity Line Asymmetries  

E-Print Network [OSTI]

We show that, if solar 5 min. oscillations are excited by convection in the upper layers of the convective envelope, it is impossible to explain the opposite line asymmetries observed in the velocity and intensity spectra with assumptions on the dissipations which reduce the problem to a second order one. The interpretation of that observation requires to solve the full non-adiabatic problem which is of the fourth or sixth order. We also analyze the causes of line asymmetries in the frame of the general problem and we show that to locate the source, it is better to study line asymmetries not too far from line centers.

M. Gabriel

1997-10-01T23:59:59.000Z

433

Asiakastyytyväisyystutkimus Sun Lines Oy:n tilausristeilyistä.  

E-Print Network [OSTI]

??Tämän tutkimuksellisen opinnäytetyön tarkoituksena on toteuttaa asiakastyytyväisyystutkimus Helsingin saaristossa risteilyliikennettä harjoittavan Sun Lines Oy:n tilausristeilyistä. Vuonna 1956 toimintansa aloittaneen perheyrityksen toimintaan kuuluvat tilausristeilyjen ohella linjaliikenne… (more)

Mattila, Outi

2010-01-01T23:59:59.000Z

434

Revised: 11/2012 Replacement diplomas may be obtained from the Office of the University Registrar and must be requested by  

E-Print Network [OSTI]

Revised: 11/2012 Replacement diplomas may be obtained from the Office of the University Registrar and must be requested by the student. To request a replacement diploma, please complete this form and send, VA 23187-8795 (757) 221-2800 Fax: (757) 221-2151 registrar@wm.edu REPLACEMENT DIPLOMA REQUEST FORM

Swaddle, John

435

3D-Model-based Face Replacement in Video Virginia Tzeng*, Yi-Ting Cheng*, Yu Liang*, Chuan-Chang Wang  

E-Print Network [OSTI]

3D-Model-based Face Replacement in Video Virginia Tzeng*, Yi-Ting Cheng*, Yu Liang*, Chuan and important topic. In this paper, we present a system for face replacement in video. Most digital processing software can perform face replacement only when the poses for the source and target faces are similar

Ouhyoung, Ming

436

CAPABILITY TO RECOVER PLUTONIUM-238 IN H-CANYON/HB-LINE  

SciTech Connect (OSTI)

Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site had previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np-237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-anyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase-3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ~ 2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase-1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material.

Fuller, K.; Smith, Robert H. Jr.; Goergen, Charles R.

2013-01-09T23:59:59.000Z

437

Capability to Recover Plutonium-238 in H-Canyon/HB-Line - 13248  

SciTech Connect (OSTI)

Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site had previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np- 237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-Canyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase- 3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ?2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase- 1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material. (authors)

Fuller, Kenneth S. Jr.; Smith, Robert H. Jr.; Goergen, Charles R. [Savannah River Nuclear Solutions, LLC, Savannah River Site, Aiken, SC 29802 (United States)] [Savannah River Nuclear Solutions, LLC, Savannah River Site, Aiken, SC 29802 (United States)

2013-07-01T23:59:59.000Z

438

6.4 A BOW-ECHO EVENT ON A SQUALL LINE IN THE NETHERLANDS Rob Groenland  

E-Print Network [OSTI]

6.4 A BOW-ECHO EVENT ON A SQUALL LINE IN THE NETHERLANDS Rob Groenland Meteo Consult, Wageningen, The Netherlands (Europe) ABSTRACT In this study, the structure of a bow-echo on a squall line is investigated . It accelerated as it moved into the Netherlands. A bow-echo developed over extreme northern Belgium

Haak, Hein

439

Thermographic inspection of massive structures  

SciTech Connect (OSTI)

Nondestructive Evaluation of concrete structures is a growing concern for the nuclear industry as well as for many other industries. As critical concrete components continue to age, the ability to assess the health and suitability for continued service has become a key consideration. In some cases, repair of these structures is difficult and expensive, while replacement is prohibitively expensive or, in some cases, not feasible. Therefore, the ability to inspect these key assets is a primary concern, especially in the nuclear industry. Due to the large size of containment buildings, cooling towers, and other large concrete assets, the ability to rapidly inspect for defects of concern is very desirable. Thermographic inspection appears to have the required ability to rapidly inspect large structures to ascertain the location and size of many of the defects of concern. This ability was demonstrated by performing a thermographic inspection of a large concrete dam in 2 days.

Renshaw, Jeremy B.; Guimaraes, Maria; Scott, David B. [Electric Power Research Institute (EPRI), 3420 Hillview Avenue, Palo Alto, CA 94304 (United States)

2014-02-18T23:59:59.000Z

440

North American Short Line and Regional Railroads Industry Report  

Broader source: Energy.gov (indexed) [DOE]

45G Short Line Tax Credit 45G Short Line Tax Credit government owned short lines government owned short lines State grants State grants D.O.E. investment D.O.E. investment...

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Structure determination of enterovirus 71  

SciTech Connect (OSTI)

Enterovirus 71 is a picornavirus that causes hand, foot and mouth disease but may induce fatal neurological illness in infants and young children. Enterovirus 71 crystallized in a body-centered orthorhombic space group with two particles in general orientations in the crystallographic asymmetric unit. Determination of the particle orientations required that the locked rotation function excluded the twofold symmetry axes from the set of icosahedral symmetry operators. This avoided the occurrence of misleading high rotation-function values produced by the alignment of icosahedral and crystallographic twofold axes. Once the orientations and positions of the particles had been established, the structure was solved by molecular replacement and phase extension.

Plevka, Pavel; Perera, Rushika; Cardosa, Jane; Kuhn, Richard J.; Rossmann, Michael G. (Purdue); (Sentinext)

2013-02-20T23:59:59.000Z

442

Glass Transition Line in C60: A Mode-Coupling/Molecular-Dynamics Study D. Costa,*, R. Ruberto,, F. Sciortino, M. C. Abramo, and C. Caccamo  

E-Print Network [OSTI]

in the density-temperature plane. The theoretical HNC and MHNC structure factors (and consequently for the Girifalco model of C60 fullerene. The equilibrium static structure factor of the model, the only required of the location of the glass line suggests that the theory accurately reproduces the shape of the arrest line

Sciortino, Francesco

443

EA-2002: Right-of-Way Application for the Tucson-Apache 115-kV Transmission Line, Pima County, Arizona  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) and the Bureau of Indian Affairs (BIA), as joint lead agencies, are preparing an EA that will evaluate the potential environmental impacts of a proposal for BIA to grant Western a 150-foot right-of-way across tribal land along the existing Tucson-Apache Transmission Line to replace the previous 100-foot right-of-way, which has expired.

444

Review Article Replacing fossil oil with fresh oil – with what and for what?  

E-Print Network [OSTI]

Industrial chemicals and materials are currently derived mainly from fossil-based raw materials, which are declining in availability, increasing in price and are a major source of undesirable greenhouse gas emissions. Plant oils have the potential to provide functionally equivalent, renewable and environmentally friendly replacements for these finite fossil-based raw materials, provided that their composition can be matched to end-use requirements, and that they can be produced on sufficient scale to meet current and growing industrial demands. Replacement of 40 % of the fossil oil used in the chemical industry with renewable plant oils, whilst ensuring that growing demand for food oils is also met, will require a trebling of global plant oil production from current levels of around 139 MT to over 400 MT annually. Realisation of this potential will rely on application of plant biotechnology to (i) tailor plant oils to have high purity (preferably>90%) of single desirable fatty acids, (ii) introduce unusual fatty acids that have specialty end-use functionalities and (iii) increase plant oil production capacity by increased oil content in current oil crops, and conversion of other high biomass crops into oil accumulating crops. This review outlines recent progress and future challenges in each of these areas. Practical applications: The research reviewed in this paper aims to develop metabolic engineering technologies to radically increase the yield and alter the fatty acid composition of plant oils and enable the

Anders S. Carlsson; Jenny Lindberg Yilmaz; Allan G. Green; Sten Stymne; Per Hofv

445

Global warming and end-use efficiency implications of replacing CFCs  

SciTech Connect (OSTI)

The direct contribution of CFCs to calculated global warming has been recognized for some time. As a result of the international agreement to phase out CFCs due to stratospheric ozone and the ensuing search for suitable alternatives, there has recently been increased attention on the DIRECT global warming potential (GWP) of the fluorocarbon alternatives as greenhouse gases. However, to date there has been little focus on the INDIRECT global warming effect arising from end-use efficiency changes and associated CO{sub 2} emissions. A study being conducted at Oak Ridge National Laboratory (ORNL) addresses this combined or total global warming impact of viable options to replace CFCs in their major energy-related applications. This paper reviews selected results for air-conditioning, refrigeration, and heat pump applications. The analysis indicates that the CFC user industries have made substantial progress in approaching near-equal energy efficiency with the HCFC/HFC alternative refrigerants. The findings also bring into question the relative importance of the DIRECT (chemical-related) effect in many applications. Replacing CFCs is an important step in reducing the total global warming impact, and at present the HCFC and HFCS appear to offer the best efficiency and lowest total impact of options available in the relatively short time period required for the transition away from CFCs.

Fairchild, P.D.; Fischer, S.K.

1991-12-31T23:59:59.000Z

446

The Real Meaning of Complex Minkowski-Space World-Lines  

E-Print Network [OSTI]

In connection with the study of shear-free null geodesics in Minkowski space, we investigate the real geometric effects in real Minkowski space that are induced by and associated with complex world-lines in complex Minkowski space. It was already known, in a formal manner, that complex analytic curves in complex Minkowski space induce shear-free null geodesic congruences. Here we look at the direct geometric connections of the complex line and the real structures. Among other items, we show, in particular, how a complex world-line projects into the real Minkowski space in the form of a real shear-free null geodesic congruence.

T. M. Adamo; E. T. Newman

2009-11-21T23:59:59.000Z

447

The Spatial Variation of the Cooling Lines in the Reflection Nebula NGC7023  

E-Print Network [OSTI]

Context: The north-west photo-dissociation region (PDR) in the reflection nebula NGC 7023 displays a complex structure. Filament-like condensations at the edge of the cloud can be traced via the emission of the main cooling lines, offering a great opportunity to study the link between the morphology and energetics of these regions. Aims: We study the spatial variation of the far-infrared fine-structure lines of [C II] (158 um) and [O I] (63 and 145 um). These lines trace the local gas conditions across the PDR. Methods: We used observations from the Herschel/PACS instrument to map the spatial distribution of these fine-structure lines. The observed region covers a square area of about 110" x 110" with an angular resolution that varies from 4" to 11". We compared this emission with ground-based and Spitzer observations of H2 lines, Herschel/SPIRE observations of CO lines, and Spitzer/IRAC 3.6 um images that trace the emission of polycyclic aromatic hydrocarbons. Results: The [C II] (158 um) and [O I] (63 and 1...

Bernard-Salas, J; Köhler, M; Abergel, A; Arab, H; Lebouteiller, V; Pinto, C; van der Wiel, M H D; White, G J; Hoffmann, M

2015-01-01T23:59:59.000Z

448

On the Disclination Lines of Nematic Liquid Crystals  

E-Print Network [OSTI]

Defects in liquid crystals are of great practical importance and theoretical interest. Despite tremendous efforts, predicting the location and transition of defects under various topological constraint and external field remains to be a challenge. We investigate defect patterns of nematic liquid crystals confined in three-dimensional spherical droplet and two-dimensional disk under different boundary conditions, within the Landau-de Gennes model. We implement a spectral method that numerically solves the Landau-de Gennes model with high accuracy, which allows us to study the detailed static structure of defects. We observe five types of defect structures. Among them the 1/2-disclination lines are the most stable structure at low temperature. Inspired by numerical results, we obtain the profile of disclination lines analytically. Moreover, the connection and difference between defect patterns under the Landau-de Gennes model and the Oseen-Frank model are discussed. Finally, four conjectures are made to summarize some important characteristics of defects in the Landau-de Gennes theory. This work is a continuing effort to deepen our understanding on defect patterns in nematic liquid crystals.

Yucheng Hu; Yang Qu; Pingwen Zhang

2014-08-25T23:59:59.000Z

449

xDSL line driver design  

E-Print Network [OSTI]

xDSL line driver is a very important element in xDSL systems. This thesis proposes a three stage xDSL line driver solution based on a multipath feedforward compensation principle. TSMC 0.8 micro meter high voltage BiCMOS technology is used as a...

Zhang, Xiaoyong

2001-01-01T23:59:59.000Z

450

results and benefits... The Bittern Line Carbon  

E-Print Network [OSTI]

results and benefits... The Bittern Line Carbon Neutral Stations Transport Regeneration Ltd. June 2008 c a s e s t u d yCRed carbon reduction Project Summary Our client, Transport Regeneration Ltd., aims to make nine stations on the Bittern Line between Norwich and Sheringham carbon neutral

Everest, Graham R

451

LA NACION LINE Ciencia/Salud  

E-Print Network [OSTI]

LA NACION LINE Ciencia/Salud Viernes 4 de Abril de 2003 LA NACION LINE | Ed. Anteriores | 4 de Abril de 2003 | Ciencia/Salud | Nota Estudio del Museo Egidio Feruglio, de Trelew La diversidad vegetal://www.lanacion.com.ar/03/04/04/sl_486019.asp LA NACION | 04/04/2003 | Página 14 | Ciencia/Salud Volver a ediciones

Wilf, Peter

452

Dynamic simulation of polyester mooring lines  

E-Print Network [OSTI]

A numerical scheme, known as CABLE3D, originally developed for the simulation of dynamics of steel chain-wire mooring lines is extended to allow for the large elongation in a mooring line, the dependence of the modulus on tension, and energy...

Kim, Min Suk

2004-09-30T23:59:59.000Z

453

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

454

Thermal Properties of Starch From New Corn Lines as Impacted by Environment and During Line Development  

SciTech Connect (OSTI)

The objectives of this research were to further characterize exotic by adapted corn inbreds by studying the impact of environment on their starch thermal properties, and investigating the development of starch thermal properties during kernel maturation by using differential scanning calorimetry (DSC). A method to expedite identification of unusual starch thermal traits was investigated by examining five corn kernels at a time, instead of one kernel, which the previous screening methods used. Corn lines with known thermal functions were blended with background starch (control) in ratios of unique starch to control starch, and analyzed by using DSC. Control starch was representative of typical corn starch. The values for each ratio within a mutant type were unique ({alpha} < 0.01) for most DSC measurements. These results supported the five-kernel method for rapidly screening large amounts of corn germplasm to identify unusual starch traits. The effects of 5 growing locations on starch thermal properties from exotic by adapted corn and Corn Belt lines were studied using DSC. The warmest location, Missouri, generally produced starch with greater gelatinization onset temperature (T{sub oG}), narrower range of gelatinization (R{sub G}), and greater enthalpy of gelatinization ({Delta}H{sub G}). The coolest location, Illinois, generally resulted in starch with lower T{sub oG}, wider R{sub G}, and lower {Delta}H{sub G}. Starch from the Ames 1 farm had thermal properties similar to those of Illinois, whereas starch from the Ames 2 farm had thermal properties similar to those of Missouri. The temperature at Ames 2 may have been warmer since it was located near a river; however, soil type and quality also were different. Final corn starch structure and function change during development and maturity. Thus, the changes in starch thermal properties during 5 stages of endosperm development from exotic by adapted corn and Corn Belt lines at two locations were studied by using DSC. The T{sub oG} tended to decrease during maturation of the kernel, whereas the {Delta}H{sub G} tended not to change. Retrogradation parameters did not vary greatly among days after pollination (DAP) and between locations. Genotypes were affected differently by environments and significant interactions were found between genotype, environment,and DAP.

Elizabeth M. Lenihan

2003-12-12T23:59:59.000Z

455

Effects of 'Limited Product Line Audits'  

E-Print Network [OSTI]

changes required in piping or storage • Replace failed compressor with new similar unit – 5% gain in efficiency. What Kind of Financial Results Can Be Expected from a Professional Compressed Air System Audit? Compressed air is a very... inefficient transfer of energy. The minimum ratio in the normal 100- psig class air system requires about 8 hp of electrical energy to create 1 hp of work with compressed air. Broad experience has shown us processes that require from 15 hp up to 70 hp...

Van Ormer, H.

2006-01-01T23:59:59.000Z

456

Chemistry and line emission of outer protoplanetary disks  

E-Print Network [OSTI]

The structure and chemistry of protoplanetary disks depends strongly on the nature of the central star around which it has formed. The dust temperature is mainly set by the stellar luminosity, while the chemistry of the upper disk layers depends on the amount of intercepted UV and X-ray flux. We will study the differences in chemistry, thermal sturcture and line emission around Herbig Ae/Be, T Tauri stars and low mass M dwarfs. Predictions will be made for future observations with SOFIA and Herschel.

Inga Kamp; Cornelis P. Dullemond; Michiel Hogerheijde; Jesus Emilio Enriquez

2005-09-21T23:59:59.000Z

457

On fibrils and field lines: The nature of H$\\alpha$ fibrils in the solar chromosphere  

E-Print Network [OSTI]

Observations of the solar chromosphere in the line-core of the \\Halpha\\ line show dark elongated structures called fibrils that show swaying motion. We performed a 3D radiation-MHD simulation of a network region, and computed synthetic \\Halpha\\ images from this simulation to investigate the relation between fibrils and the magnetic field lines in the chromosphere. The periods, amplitudes and phase-speeds of the synthetic fibrils are consistent with those observed. We analyse the relation between the synthetic fibrils and the field lines threading through them, and find that some fibrils trace out the same field line along the fibril's length, but there are also fibrils that sample different field lines at different locations along their length. Fibrils sample the same field lines on a time scale of $\\sim200$~s. This is shorter than their own lifetime. We analysed the evolution of the atmosphere along a number of field lines that thread through fibrils and find that they carry slow-mode waves that load mass in...

Leenaarts, Jorrit; van der Voort, Luc Rouppe

2015-01-01T23:59:59.000Z

458

Product Lines that supply other Product Lines: A Service-Oriented Approach Salvador Trujillo  

E-Print Network [OSTI]

Product Lines that supply other Product Lines: A Service-Oriented Approach Salvador Trujillo@uni-passau.de Abstract A software product line is a family of software products that share a set of core assets with the goal of reuse. In this paper, we focus on a scenario in which different products from different product

Apel, Sven

459

Accelerated line-search and trust-region methods  

E-Print Network [OSTI]

Apr 3, 2008 ... Here we consider ``accelerated'' versions of these methods, where the conventional iterate is allowed to be replaced by any point that ...

P.-A. Absil

2008-04-03T23:59:59.000Z

460

Testing tri-state and pass transistor circuit structures  

E-Print Network [OSTI]

Tri-state structures are used to implement multiplexers and buses because these structures are faster than AND/OR logic structures. But testing of tri-state structures has some issues associated with it. A stuck open control line of a tri-state gate...

Parikh, Shaishav Shailesh

2005-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Some thoughts and remarks on Structural Materials and Data Bases  

E-Print Network [OSTI]

and validated within the next two decades. Scope: Fusion Power Plant ­ driven by "economy": Structural materials)years before replacement for a as large as possible T-window (thermal efficiency) 2-3 fpy for Divertor Note of uncertainty in design and analysis · What can we do in the absence of high-fluence data simulating the Slide 5

462

Replacing Resistance Heating with Mini-Split Heat Pumps, Sharon, Connecticut (Fact Sheet)  

SciTech Connect (OSTI)

Mini-split heat pumps can provide space heating and cooling in many climates and are relatively affordable. These and other features make them potentially suitable for retrofitting into multifamily buildings in cold climates to replace electric resistance heating or other outmoded heating systems. This report investigates the suitability of mini-split heat pumps for multifamily retrofits. Various technical and regulatory barriers are discussed and modeling was performed to compare long-term costs of substituting mini-splits for a variety of other heating and cooling options. A number of utility programs have retrofit mini-splits in both single family and multifamily residences. Two such multifamily programs are discussed in detail.

Not Available

2014-05-01T23:59:59.000Z

463

The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project  

SciTech Connect (OSTI)

The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref.

Presgrove, S.B. (Bechtel Savannah River, Inc., North Augusta, SC (United States))

1992-01-01T23:59:59.000Z

464

The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project  

SciTech Connect (OSTI)

The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref.

Presgrove, S.B. [Bechtel Savannah River, Inc., North Augusta, SC (United States)

1992-08-01T23:59:59.000Z

465

Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects  

SciTech Connect (OSTI)

This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

Richman, Eric E.

2009-11-04T23:59:59.000Z

466

Refined coconut oil as a source of dietary fat in a milk replacer for dairy calves  

E-Print Network [OSTI]

eesesae. ga gessac yesco che 4ieoeyery et escQdoasss, chs 41ssesssy sa4 sse ?4 ecohiliss4 viceala espplsssocb ~ Chs Leeseesso ess ot 4rls4 aLLb pss4sscs is oilb rsplassrr trsreoiee hae ssoccibscs4 cs chs ~Lep- osec ot Lapsoosa ss4 sttisissc er...LLh seplasee tssaslas (to) Chs sss4 terr lsc ss ~ elsCrsSMC lo ICLLb ssplssete tos osLToo ses cesecsiss4 as socle es cbs i4sa st teoaslociaw ~ spscbscia Fecfes Norr gssag saL~. os4-Liver eiL ~ Leraheblp cbs- ticac siL sss4 cs replace Che 4SC St Shale allb...

Barsales, Petronilo Bringuel

2012-06-07T23:59:59.000Z

467

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

468

A 3D radiative transfer framework: II. line transfer problems  

E-Print Network [OSTI]

Higher resolution telescopes as well as 3D numerical simulations will require the development of detailed 3D radiative transfer calculations. Building upon our previous work we extend our method to include both continuum and line transfer. We present a general method to calculate radiative transfer including scattering in the continuum as well as in lines in 3D static atmospheres. The scattering problem for line transfer is solved via means of an operator splitting (OS) technique. The formal solution is based on a long-characteristics method. The approximate $\\Lambda$ operator is constructed considering nearest neighbors {\\em exactly}. The code is parallelized over both wavelength and solid angle using the MPI library. We present the results of several test cases with different values of the thermalization parameter and two choices for the temperature structure. The results are directly compared to 1D spherical tests. With our current grid setup the interior resolution is much lower in 3D than in 1D, nevertheless the 3D results agree very well with the well-tested 1D calculations. We show that with relatively simple parallelization that the code scales to very large number of processors which is mandatory for practical applications. Advances in modern computers will make realistic 3D radiative transfer calculations possible in the near future. Our current code scales to very large numbers of processors, but requires larger memory per processor at high spatial resolution.

E. Baron; Peter H. Hauschildt

2007-03-16T23:59:59.000Z

469

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

470

X-RAY EMISSION LINE PROFILES FROM WIND CLUMP BOW SHOCKS IN MASSIVE STARS  

SciTech Connect (OSTI)

The consequences of structured flows continue to be a pressing topic in relating spectral data to physical processes occurring in massive star winds. In a preceding paper, our group reported on hydrodynamic simulations of hypersonic flow past a rigid spherical clump to explore the structure of bow shocks that can form around wind clumps. Here we report on profiles of emission lines that arise from such bow shock morphologies. To compute emission line profiles, we adopt a two-component flow structure of wind and clumps using two 'beta' velocity laws. While individual bow shocks tend to generate double-horned emission line profiles, a group of bow shocks can lead to line profiles with a range of shapes with blueshifted peak emission that depends on the degree of X-ray photoabsorption by the interclump wind medium, the number of clump structures in the flow, and the radial distribution of the clumps. Using the two beta law prescription, the theoretical emission measure and temperature distribution throughout the wind can be derived. The emission measure tends to be power law, and the temperature distribution is broad in terms of wind velocity. Although restricted to the case of adiabatic cooling, our models highlight the influence of bow shock effects for hot plasma temperature and emission measure distributions in stellar winds and their impact on X-ray line profile shapes. Previous models have focused on geometrical considerations of the clumps and their distribution in the wind. Our results represent the first time that the temperature distribution of wind clump structures are explicitly and self-consistently accounted for in modeling X-ray line profile shapes for massive stars.

Ignace, R. [Department of Physics and Astronomy, East Tennessee State University, Johnson City, TN 37614 (United States); Waldron, W. L. [Eureka Scientific Inc., 2452 Delmer Street, Oakland, CA 94602 (United States); Cassinelli, J. P. [Department of Astronomy, University of Wisconsin-Madison, Madison, WI 53711 (United States); Burke, A. E., E-mail: ignace@etsu.edu, E-mail: wwaldron@satx.rr.com, E-mail: cassinelli@astro.wisc.edu, E-mail: burke.alexander@gmail.com [990 Washington Street 317, Dedham, MA 02026 (United States)

2012-05-01T23:59:59.000Z

471

Particle beam and crabbing and deflecting structure  

DOE Patents [OSTI]

A new type of structure for the deflection and crabbing of particle bunches in particle accelerators comprising a number of parallel transverse electromagnetic (TEM)-resonant) lines operating in opposite phase from each other. Such a structure is significantly more compact than conventional crabbing cavities operating the transverse magnetic TM mode, thus allowing low frequency designs.

Delayen, Jean (Yorktown, VA)

2011-02-08T23:59:59.000Z

472

Channelized voice over digital subscriber line  

E-Print Network [OSTI]

The objective of this article is to present a promising voice over digital subscriber line (VoDSL) solution: an alternative method that uses physical layer transportation to provide channelized VoDSL (CVoDSL). This article ...

Habib, A.; Saiedian, Hossein

2002-10-01T23:59:59.000Z

473

Temperatures in the blast furnace refractory lining  

SciTech Connect (OSTI)

The campaign life duration of a blast furnace is mainly determined by the condition of the refractory lining in heavy-duty zones such as the hearth, bosh, belly and lower stack. To achieve a desired lifetime, the temperature of the lining in these areas thereby proved to be the decisive controllable parameter. Low operating temperatures result in prolonged service life and are attained through high cooling efficiency. Besides the refractory grade chosen, the wear profile is mainly determined by the type of cooling system applied and the cooling intensity. Therefore, an appropriate compromise between long service life and energy losses has to be found in each case. In order to predict the service life of a lining it is important to know the wear condition at all times during the campaign. The paper describes the approaches the authors have made so far on European blast furnaces, on a theoretical and practical basis, on how to analyze the lining wear.

Hebel, R.; Streuber, C. [Didier-M and P Energietechnik GmbH, Wiesbaden (Germany); Steiger, R. [Didier-M and P Engineering Services, Highland, IN (United States); Jeschar, R. [TU Clausthal (Germany). Inst. fuer Energieverfahrenstechnik und Brennstofftechnik

1995-12-01T23:59:59.000Z

474

Ames Lab 101: Next Generation Power Lines  

SciTech Connect (OSTI)

Ames Laboratory scientist Alan Russell discusses the need to develop new power lines that are stronger and more conductive as a way to address the problem of the nation's aging and inadequate power grid.

Russell, Alan

2010-01-01T23:59:59.000Z

475

Insulate Steam Distribution and Condensate Return Lines  

SciTech Connect (OSTI)

This revised ITP tip sheet on insulating steam distribution and condensate return lines provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

476

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

477

Line Environment, Safety and Health Oversight  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Sets forth the Department's expectations line management environment, safety and health (ES&H) oversight and for the use of contractor self-assessment programs as the cornerstone for this oversight. Canceled by DOE O 226.1.

1997-06-26T23:59:59.000Z

478

Ames Lab 101: Next Generation Power Lines  

ScienceCinema (OSTI)

Ames Laboratory scientist Alan Russell discusses the need to develop new power lines that are stronger and more conductive as a way to address the problem of the nation's aging and inadequate power grid.

Russell, Alan

2012-08-29T23:59:59.000Z

479

Heat-Traced Fluid Transfer Lines  

E-Print Network [OSTI]

HEAT-TRACED FLUID TRANSFER LINES Robert E. Schilling, P.E. Eaton Corporation Aurora, Ohio This paper discusses basic considerations in designing a heat tracing system using either steam or electrical tracing. Four basic reasons to heat...

Schilling, R. E.

1984-01-01T23:59:59.000Z

480

What is the Broad Line Region?  

E-Print Network [OSTI]

What is the Broad Line Region (BLR) made of? What determines its location? Why is it sometimes missing? What controls its properties? Some recent results and new approaches which may shed light on these issues are briefly described.

Ari Laor

2003-12-16T23:59:59.000Z

Note: This page contains sample records for the topic "line structure replacements" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Productivity Improvement of a Manual Assembly Line  

E-Print Network [OSTI]

The current project addresses the productivity improvement of a manual assembly line by making use of operations analysis in the framework of Lean production. A methodology is proposed that helps to improve the productivity of any production process...

Yerasi, Pranavi

2012-10-19T23:59:59.000Z

482

Corona losses in HVdc bipolar lines  

SciTech Connect (OSTI)

The problem related to the prediction of corona losses in HVdc bipolar lines has been solved, in the past, by means of semi-empirical monomial formulae. However, the proposed formulae that are simpler to use do not always give adequate calculation precision, while the formulae that provide the closest results require implicit functions of different complexity, which are difficult to apply; moreover, it is not possible to understand clearly what influence the variations of the different line parameters have on the losses themselves. The new monomial semi-empirical relationship, proposed to predict the corona losses in HVdc bipolar lines, is very simple to use; it highlights the dependence of power losses due to the corona effect by the different line parameters. The formula has been developed by elaborating a considerable amount of available experimental data.

Corbellini, U.; Pelacchi, P. [Univ. of Pisa (Italy). Dept. of Electric Systems and Automation] [Univ. of Pisa (Italy). Dept. of Electric Systems and Automation

1996-07-01T23:59:59.000Z

483

Lining Over Refractory - Conserve Energy and Capital  

E-Print Network [OSTI]

.~. LINING OVER REFRACTORY - CONSERVE ENERGY & CAPITAL by Mark L. Jost Gerald L. Barrows The Carborundum Company Niagara Falls, New York INTRODUCTION Companies operating industrial heating equip Advantages ment find themselves coming under...

Jost, M. L.; Barrows, G. L.

1980-01-01T23:59:59.000Z

484

Reviewing progress in PJM's capacity market structure via the new reliability pricing model  

SciTech Connect (OSTI)

The Reliability Pricing Model introduces significant changes to the capacity market structure of PJM. The main feature of the RPM design is a downward-sloping demand curve, which replaces the highly volatile vertical demand curve. The authors review the latest RPM structure, results of the auctions, and the future course of the implementation process. (author)

Sener, Adil Caner; Kimball, Stefan

2007-12-15T23:59:59.000Z

485

Controlling terahertz waves with meta-materials and photonic bandgap structures  

SciTech Connect (OSTI)

We will describe research conducted at Los Alamos National Laboratory towards developing components for controlling terahertz waves. We employ meta-materials and, particularly, meta-films, as very compact absorbers for controlling quasioptical beams. We believe that dielectric photonic bandgap structures could replace ordinary metal waveguide devices at THz, since metal structures become extremely lossy in this frequency range.

Shchegolkov, Dmitry [Los Alamos National Laboratory; Azad, Abul [Los Alamos National Laboratory; O' Hara, John F [Los Alamos National Laboratory; Moody, Nathan A [Los Alamos National Laboratory; Simakov, Evgenya I [Los Alamos National Laboratory

2010-12-07T23:59:59.000Z

486

A Semi-Analytical Line Transfer (SALT) model to interpret the spectra of galaxy outflows  

E-Print Network [OSTI]

We present a Semi-Analytical Line Transfer model, SALT, to study the absorption and re-emission line profiles from expanding galactic envelopes. The envelopes are described as a superposition of shells with density and velocity varying with the distance from the center. We adopt the Sobolev approximation to describe the interaction between the photons escaping from each shell and the remaining of the envelope. We include the effect of multiple scatterings within each shell, properly accounting for the atomic structure of the scattering ions. We also account for the effect of a finite circular aperture on actual observations. For equal geometries and density distributions, our models reproduce the main features of the profiles generated with more complicated transfer codes. Also, our SALT line profiles nicely reproduce the typical asymmetric resonant absorption line profiles observed in star-forming/starburst galaxies whereas these absorption profiles cannot be reproduced with thin shells moving at a fixed out...

Scarlata, C

2015-01-01T23:59:59.000Z

487

Resolving Molecular Line Emission from Protoplanetary Disks: Observational Prospects for Disks Irradiated by Infalling Envelopes  

E-Print Network [OSTI]

Molecular line observations that could resolve protoplanetary disks of ~100 AU both spatially and kinematically would be a useful tool to unambiguously identify these disks and to determine their kinematical and physical characteristics. In this work we model the expected line emission from a protoplanetary disk irradiated by an infalling envelope, addressing the question of its detectability with subarcsecond resolution. We adopt a previously determined disk model structure that gives a continuum spectral energy distribution and a mm intensity spatial distribution that are consistent with observational constraints of HL Tau. An analysis of the capability of presently working and projected interferometers at mm and submm wavelengths shows that molecular transitions of moderate opacity at these wavelengths (e.g., C17O lines) are good candidates for detecting disk lines at subarcsecond resolution in the near future. We suggest that, in general, disks of typical Class I sources will be detectable.

Jose F. Gomez; Paola D'Alessio

1999-12-02T23:59:59.000Z

488

Resolving Molecular Line Emission from Protoplanetary Disks Observational Prospects for Disks Irradiated by Infalling Envelopes  

E-Print Network [OSTI]

Molecular line observations that could resolve protoplanetary disks of ~100 AU both spatially and kinematically would be a useful tool to unambiguously identify these disks and to determine their kinematical and physical characteristics. In this work we model the expected line emission from a protoplanetary disk irradiated by an infalling envelope, addressing the question of its detectability with subarcsecond resolution. We adopt a previously determined disk model structure that gives a continuum spectral energy distribution and a mm intensity spatial distribution that are consistent with observational constraints of HL Tau. An analysis of the capability of presently working and projected interferometers at mm and submm wavelengths shows that molecular transitions of moderate opacity at these wavelengths (e.g., C17O lines) are good candidates for detecting disk lines at subarcsecond resolution in the near future. We suggest that, in general, disks of typical Class I sources will be detectable.

Gomes, J F; Gomez, Jose F.; Alessio, Paola D'

1999-01-01T23:59:59.000Z

489

ISO-LWS observations of C+ and O lines in absorption toward SgrB2  

E-Print Network [OSTI]

High spectral resolution ISO-LWS observations of the [OI] 63.2 and 145.5 microns and [CII] 157.7 microns fine structure lines are presented for the center of the Sagittarius B2 complex (SgrB2). Both the [OI] 63.2 microns and the [CII] 157.7 microns lines are detected in absorption. Using observations of the CO isotopes and of the HI lines, absorption components can be associated with many clouds along the Sgr B2 line of sight. From these data, we were able to disentangle three different layers, as predicted by PDR models, which contain atomic oxygen. We derive lower limits for the column densities of C and O. The fact that the [CII] 157.7 microns line is detected in absorption implies that the main cooling line of the interstellar medium can be optically thick especially in the direction of large star-forming complexes or in the nuclei of galaxies. This could partially account for the deficiency in the [CII] 157.7 microns line which has been recently found toward infrared bright galaxies in ISO data.

Charlotte Vastel; Edward Polehampton; Jean-Paul Baluteau; Bruce Swinyard; Emmanuel Caux; Pierre Cox

2002-08-09T23:59:59.000Z

490

I/O-Efficient Algorithms for Contour Line Extraction and Planar Graph Blocking  

E-Print Network [OSTI]

For a polyhedral terrain C, the contour at z-coordinate h, denoted Ch, is defined to be the intersection of the plane z = h with C. In this paper, we study the contour-line extraction problem, where we want to preprocess C into a data structure so...

Agarwal, Pankaj K.; Arge, Lars; Murali, T. M.; Kasturi R., Varadarajan; Vitter, Jeffrey Scott

1998-01-01T23:59:59.000Z

491

New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York)  

Broader source: Energy.gov [DOE]

Any proposed construction of electricity-related facilities in residential subdivisions, including distribution and service lines and appurtenant facilities, is subject to these regulations, which...

492

Genetic diversity and combining ability among sorghum conversion lines  

E-Print Network [OSTI]

on genetic similarities estimated using AFLP markers and (3) to estimate heterosis, general and specific combining ability for grain yield among the set of conversion lines. Genetic diversity was present in the set of conversion lines evaluated. For the lines...

Mateo Moncada, Rafael Arturo

2007-04-25T23:59:59.000Z

493

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network [OSTI]

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

494

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

495

Use of waste gypsum to replace natural gypsum as set retarders in portland cement  

SciTech Connect (OSTI)

The present study is focused on clarifying the influence of waste gypsum (WG) in replacing natural gypsum (NG) in the production of ordinary Portland cement (OPC). WG taken from slip casting moulds in a ceramic factory was formed from the hydration of plaster of paris. Clinker and 3-5 wt% of WG was ground in a laboratory ball mill to produce cement waste gypsum (CMWG). The same procedure was repeated with NG to substitute WG to prepare cement natural gypsum (CMNG). The properties of NG and WG were investigated via X-ray Diffraction (XRD), X-ray fluorescence (XRF) and differential scanning calorimetry (DSC)/thermogravimetric (TG) to evaluate the properties of CMNG and CMWG. The mechanical properties of cement were tested in terms of setting time, flexural and compressive strength. The XRD result of NG revealed the presence of dihydrate while WG contained dihydrate and hemihydrate. The content of dihydrate and hemihydrates were obtained via DSC/TG, and the results showed that WG and NG contained 12.45% and 1.61% of hemihydrate, respectively. Furthermore, CMWG was found to set faster than CMNG, an average of 15.29% and 13.67% faster for the initial and final setting times, respectively. This was due to the presence of hemihydrate in WG. However, the values obtained for flexural and compressive strength were relatively the same for CMNG and CMWG. Therefore, this result provides evidence that WG can be used as an alternative material to NG in the production of OPC.

Chandara, Chea; Azizli, Khairun Azizi Mohd [School of Materials and Mineral Resources Engineering, Universiti Sains Malaysia, 14300 Nibong Tebal, Penang (Malaysia); Ahmad, Zainal Arifin [School of Materials and Mineral Resources Engineering, Universiti Sains Malaysia, 14300 Nibong Tebal, Penang (Malaysia)], E-mail: zainal@eng.usm.my; Sakai, Etsuo [Tokyo Institute of Technology, Graduate School of Science and Engineering, Department of Metallurgy and Ceramic Science, 2-12-1 Meguro-ku, Ookayama, Meguro-ku, Tokyo 152-8552 (Japan)

2009-05-15T23:59:59.000Z

496

Building America Case Study: Boiler Control Replacement for Hydronically Heated Multifamily Buildings, Cambridge, Massachusetts (Fact Sheet)  

SciTech Connect (OSTI)

The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

Not Available

2014-11-01T23:59:59.000Z

497

Synthesis and casting of a lithium-bismuth compound for an ion-replacement electrorefiner.  

SciTech Connect (OSTI)

The intermetallic compound Li{sub 3}Bi played an integral part in the demonstration of an ion replacement electrorefining method developed at Argonne National Laboratory. The Li{sub 3}Bi compound was generated in a tilt-pour casting furnace using high-purity lithium and bismuth metals as the initial charge. At first, small-scale ({approximately}20 g) experiments were conducted to determine the materials synthesis parameters. In the end, four larger-scale castings (500 g to 1250 g) were completed in a tantalum crucible. The metals were heated slowly to melt the charge, and the formation reaction proceeded vigorously above the melting point of bismuth ({approximately}270 C). For the large-scale melts, the furnace power was temporarily turned off at this point. After several minutes, the tantalum crucible stopped glowing, and the furnace power was turned on. The temperature was then increased to {approximately}1200 C to melt and homogenize the compound, and liquid Li{sub 3}Bi was cast into cold stainless steel molds. Approximately 3.7 kg of Li{sub 3}Bi was generated by this method.

McDeavitt, S. M.

1998-11-23T23:59:59.000Z

498

Methods for disassembling, replacing and assembling parts of a steam cooling system for a gas turbine  

DOE Patents [OSTI]

The steam cooling circuit for a gas turbine includes a bore tube assembly supplying steam to circumferentially spaced radial tubes coupled to supply elbows for transitioning the radial steam flow in an axial direction along steam supply tubes adjacent the rim of the rotor. The supply tubes supply steam to circumferentially spaced manifold segments located on the aft side of the 1-2 spacer for supplying steam to the buckets of the first and second stages. Spent return steam from these buckets flows to a plurality of circumferentially spaced return manifold segments disposed on the forward face of the 1-2 spacer. Crossover tubes couple the steam supply from the steam supply manifold segments through the 1-2 spacer to the buckets of the first stage. Crossover tubes through the 1-2 spacer also return steam from the buckets of the second stage to the return manifold segments. Axially extending return tubes convey spent cooling steam from the return manifold segments to radial tubes via return elbows. The bore tube assembly, radial tubes, elbows, manifold segments and crossover tubes are removable from the turbine rotor and replaceable.

Wilson, Ian D. (Mauldin, SC); Wesorick, Ronald R. (Albany, NY)

2002-01-01T23:59:59.000Z

499

Replacement of Lighting Fixtures with LED Energy Efficient Lights at the Parking Facility, Milwaukee, Wisconsin  

SciTech Connect (OSTI)

The Forest County Potawatomi Community (FCPC or Tribe) owns a six-story parking facility adjacent to its Potawatomi Bingo Casino (the Casino) in Milwaukee, Wisconsin, as well as a valet parking facility under the Casino (collectively, the Parking Facility). The Parking Facility contained 205-watt metal halide-type lights that, for security reasons, operated 24 hours per day, 7 days per week. Starting on August 30, 2010, the Tribe replaced these fixtures with 1,760 state-of-the-art, energy efficient 55-Watt LED lights. This project resulted in an immediate average reduction in monthly peak demand of 238 kW over the fourth quarter of 2010. The average reduction in monthly peak demand from October 1 through December 31, 2010 translates into a forecast annual electrical energy reduction of approximately 1,995,000 kWh or 47.3% of the pre-project demand. This project was technically effective, economically feasible, and beneficial to the public not only in terms of long term energy efficiency and associated emissions reductions, but also in the short-term jobs provided for the S.E. Wisconsin region. The project was implemented, from approval by U.S. Department of Energy (DOE) to completion, in less than 6 months. The project utilized off-the-shelf proven technologies that were fabricated locally and installed by local trade contractors.

David Brien

2012-06-21T23:59:59.000Z

500

Hydronic Heating Retrofits for Low-Rise Multifamily Buildings: Boiler Control Replacement and Monitoring  

SciTech Connect (OSTI)

The ARIES Collaborative, a U.S. Department of Energy Building America research team, partnered with NeighborWorks America affiliate Homeowners' Rehab Inc. (HRI) of Cambridge, Massachusetts, to study improvements to the central hydronic heating system in one of the nonprofit's housing developments. The heating controls in the three-building, 42-unit Columbia Cambridge Alliance for Spanish Tenants housing development were upgraded. Fuel use in the development was excessive compared to similar properties. A poorly insulated thermal envelope contributed to high energy bills, but adding wall insulation was not cost-effective or practical. The more cost-effective option was improving heating system efficiency. Efficient operation of the heating system faced several obstacles, including inflexible boiler controls and failed thermostatic radiator valves. Boiler controls were replaced with systems that offer temperature setbacks and one that controls heat based on apartment temperature in addition to outdoor temperature. Utility bill analysis shows that post-retrofit weather-normalized heating energy use was reduced by 10%-31% (average of 19%). Indoor temperature cutoff reduced boiler runtime (and therefore heating fuel consumption) by 28% in the one building in which it was implemented. Nearly all savings were obtained during night which had a lower indoor temperature cut off (68 degrees F) than day (73 degrees F). This implies that the outdoor reset curve was appropriately adjusted for this building for daytime operation. Nighttime setback of heating system supply water temperature had no discernable impact on boiler runtime or gas bills.

Dentz, J.; Henderson, H.; Varshney, K.

2014-09-01T23:59:59.000Z