Powered by Deep Web Technologies
Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

B1.3 SWCX for Routine Maintenance Services-  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Services- Maintenance Services- Revision 0 Sitewide Categorical Exclusion for Routine Maintenance Services Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office Integrated J\1anagement System Procedure, l'IEPA Analysis at Hanford, a sitewide categorical exclusion is: An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the same or lesser scope) of DOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide

2

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect (OSTI)

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

3

An evaluation of forecasting methods for aircraft non-routine maintenance material demand  

Science Journals Connector (OSTI)

Aircraft maintenance can be divided into routine and non-routine activities. Material demand associated with non-routine maintenance is typically intermittent or lumpy: it has a large variance in frequency and quantity. Consequently, this type of demand is hard to predict. This paper introduces a method to collect time series datasets for aircraft non-routine maintenance material demand. Non-routine material consumption is linked to scheduled maintenance tasks to gain insight in demand patterns. A structural part selection of the Boeing 737NG fleet of an aviation partner has been sampled to generate various test cases. Subsequently, various forecasting methods are applied to these test cases and evaluated using various accuracy metrics. For the small time series datasets associated with non-routine maintenance, exponentially weighted moving average (EMA) outperformed smoothing methods such as Croston's method (CR) and the Syntetos-Boylan approximation (SBA). To validate the practical applicability of EMA for non-routine maintenance material demand, the method has been applied and verified in the prediction of actual demand for a separate maintenance C-check.

Maarten Zorgdrager; Wim J.C. Verhagen; Richard Curran

2014-01-01T23:59:59.000Z

4

EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Plan  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

5

Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3  

SciTech Connect (OSTI)

The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

Leigh, Richard J.

2012-09-01T23:59:59.000Z

6

Mead-Liberty 345-kV Transmission Line Access Road Maintenance...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 Mead-Liberty 345-kV Transmission Line Access Road Maintenance and Localized Vegetation Management Maricopa County, Arizona Categorical Exclusion Continuation Sheet Project...

7

On-line maintenance methodology development and its applications  

SciTech Connect (OSTI)

With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)

Kim, J.; Jae, M. [Dept. of Nuclear Engineering, Hanyang Univ., 17 Haengdang, Sungdong, Seoul (Korea, Republic of)

2012-07-01T23:59:59.000Z

8

SITEWIDE CATEGORICAL EXCLUSION FOR ROUTINE  

Broader source: Energy.gov (indexed) [DOE]

CATEGORICAL EXCLUSION FOR ROUTINE CATEGORICAL EXCLUSION FOR ROUTINE MAINTENANCE AT PACIFIC NORTHWEST NATIONAL LABORATORY Proposed Action The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) proposes to conduct routine maintenance at Pacific Northwest National Laboratory (PNNL) facilities and existing infrastructure. Location of Action The proposed action would occur on the PNNL site in Richland, Washington and in other PNNL facilities located in the State of Washington.

9

Microsoft Word - 052606 Final Pepco DOE maintenance notice.doc  

Broader source: Energy.gov (indexed) [DOE]

26, 2006 26, 2006 Lawrence Mansueti Office of Electricity Delivery and Energy Reliability U.S. Department of Energy Rm. 8H-033 1000 Independence Avenue Washington, D.C. 20585 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01 Dear Mr. Mansueti, Per your request, Potomac Electric Power Company ("Pepco"), on behalf of itself and PJM Interconnection, L.L.C. ("PJM"), is providing you with information regarding the planned transmission maintenance outage scheduled for the upcoming weekend. Pepco notes that the scheduled maintenance activities are not associated with its new transmission line installation, but are routine maintenance activities resulting from a switch problem identified during routine

10

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

11

Maintenance and Veg Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Reauthorization of Transmission Line Permits, Maintenance and Vegetation Management on Forest Service Lands in Colorado,...

12

Synthesis of Innovative Contracting Strategies Used for Routine and  

E-Print Network [OSTI]

0-6388-P1 Synthesis of Innovative Contracting Strategies Used for Routine and Preventive-6388: Synthesis Study on Innovative Contract Techniques for Routine and Preventive Maintenance Contracts January................................................................. 5 1.5 Organization of the Synthesis ....................................................... 6

Texas at Austin, University of

13

Design and Validation of a Mobile Robot for PowerDesign and Validation of a Mobile Robot for PowerDesign and Validation of a Mobile Robot for PowerDesign and Validation of a Mobile Robot for Power Line Inspection and MaintenanceLine Inspection and Mainten  

E-Print Network [OSTI]

of the prototype thorough validation. Working on live lines, up to 735 kV and 1,000 A, means that the technology inspection and maintenance on its transmission lines [9]. From the very beginning, the key objectiveSystem RequirementsSystem RequirementsSystem Requirements A complete review of transmission line components

Paris-Sud XI, Université de

14

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect (OSTI)

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

15

Microsoft Word - CX-BigEddy-Redmond-ConductorMaintenance-FY13_WEB  

Broader source: Energy.gov (indexed) [DOE]

4, 2013 4, 2013 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Stacy Hensley Project Manager - TEP-CSB-2 Proposed Action: Conductor maintenance on Bonneville Power Administration's (BPA) Big Eddy-Redmond transmission line Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: Approximately six miles southeast of The Dalles in Wasco County, Oregon. T1N, R14E, Sec 4, 5, 9, 20, 28, 29, and 33 Proposed by: BPA Description of the Proposed Action: BPA proposes to perform routine maintenance on the Big Eddy-Redmond, 230-kilovolt transmission line conductor. The proposed work includes re-sagging the transmission line, and replacing the transmission line hardware and transmission

16

Maintenance Types  

Broader source: Energy.gov [DOE]

Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

17

Reactive Maintenance  

Broader source: Energy.gov [DOE]

Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

18

Microsoft Word - CX-Colville-Republic-Maintenance-FY13_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Terry Kugler Lineman Foreman III - TFSF-Bell Proposed Action: Routine maintenance on the Colville-Republic No. 1 transmission line PP&A Project No.: 2,139 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: Ferry and Stevens counties, Washington; Bonneville Power Administration's (BPA) Bell District Proposed by: BPA Description of the Proposed Action: BPA proposes to replace deteriorating wood pole towers and associated components (e.g. cross arms, insulators, guy anchors, etc.) along its Colville- Republic No. 1, 115-kilovolt transmission line in Ferry and Stevens counties, Washington. This

19

Operations & Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contact Information Transmission Planning Western OATT Revision Maintenance Services Meter policy (pdf) Meter application agreement Behind the Meter Generation policy (doc)...

20

Remote maintenance  

SciTech Connect (OSTI)

A general description is given of the study of maintenance design in reactor designs. The Fusion Experimental Reactor and INTOR-J are discussed in terms of simplicity in remote maintenance design, and a figure shows one of the designs of a torus sector configuration for the Fusion Experimental Reactor. An R-tokamak which is under design is a D-T burning device with a Q less than unity. Technical issues are listed and it is suggested that a long-range plan for fusion remote maintenance should be implemented. A multijoint inspection system and a remote maintenance simulation test model of the divertor module are shown.

Kazawa, Y.; Tachikawa, K.; Tone, T.

1983-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Preventive Maintenance  

Broader source: Energy.gov [DOE]

Preventive maintenance aims to sustain and/or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time.

22

Predictive Maintenance  

Broader source: Energy.gov [DOE]

Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

23

Type of Issuance: Routine.  

E-Print Network [OSTI]

Incidents, ” (2) Section 1 – Inserted non-fire incident and wildland urban interface support language. (3) Section 3 – Created references to protection and assistance to emergency management. (4) Section 4- Added general statement of appropriate provision of special services, (5) Section 5.6 – Added reference to SPC’s longer range fire weather outlooks, and (6) Section 6 – Added NFDRS verification and user response feedback as measures of effectiveness of program. 1. Fire, in a natural or prescribed form, is important to the maintenance and health of most ecosystems. However, wildfire can also present an urgent threat to life and property, especially in the wildland-urban interface and those fighting fires require expert meteorological support. In addition, non-fire incidents including (but not limited to) hazardous materials spills, search and rescue operations and disaster recovery can also present immediate threats to life and property and require meteorological support. Timely and accurate fire weather forecasts and warnings spanning minutes out to months in the future are used by land and fire management agencies for planning and fire suppression purposes. 2. This directive governs the National Oceanic and Atmospheric Administration’s (NOAA)

unknown authors

2009-01-01T23:59:59.000Z

24

Reliability-Centered Maintenance  

Broader source: Energy.gov [DOE]

Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance.

25

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah  

Broader source: Energy.gov [DOE]

This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

26

Microsoft Word - maintenance  

Broader source: Energy.gov (indexed) [DOE]

System Maintenance Checklist System Maintenance Checklist The following checklist is intended to provide system owners, project managers and other information system developers and maintainers with guidance in identifying and planning system maintenance activities. The objectives of system maintenance are summarized as: C Resolution of errors, faults, and failures. C The requirements for system maintenance initiates lifecycle changes. The change is remapped and executed, thereby treating the maintenance process as iterations of development. Rev: 09/02 1 Maintenance Checklist SEM Reference Comments " A procedure exists for handling emergency changes that cannot be implemented as part of a scheduled release. Chapter 10 Maintenance " An identification number is assigned to the modification.

27

Solar Water Heating System Maintenance and Repair | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Water Heating System Maintenance and Repair Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Solar energy systems require periodic inspections and routine maintenance to keep them operating efficiently. Also, from time to time, components may need repair or replacement. You should also take steps to prevent scaling, corrosion, and freezing. You might be able to handle some of the inspections and maintenance tasks on your own, but others may require a qualified technician. Ask for a cost estimate in writing before having any work done. For some systems, it may

28

Predictive Maintenance Technologies  

Broader source: Energy.gov [DOE]

Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

29

Evolving Visual Routines Michael Patrick Johnson  

E-Print Network [OSTI]

Evolving Visual Routines by Michael Patrick Johnson B.S., Computer Science Massachusetts Institute Routines by Michael Patrick Johnson Submitted to the Program in Media Arts and Sciences, School by NSF grant number IRI­92056688. 2 #12; Evolving Visual Routines by Michael Patrick Johnson

Fernandez, Thomas

30

Online Monitoring to Enable Improved Diagnostics, Prognostics and Maintenance  

SciTech Connect (OSTI)

For both existing and new plant designs there are increasing opportunities and needs for the application of advanced online surveillance, diagnostic and prognostic techniques. These methods can continuously monitor and assess the health of nuclear power plant systems and components. The added effectiveness of such programs has the potential to enable holistic plant management, and minimize exposure to future and unknown risks. The 'NDE & On-line Monitoring' activities within the Advanced Instrumentation, Information and Control Systems (II&CS) Pathway are developing R&D to establish advanced condition monitoring and prognostics technologies to understand and predict future phenomena, derived from plant aging in systems, structures, and components (SSC). This research includes utilization of the enhanced functionality and system condition awareness that becomes available through the application of digital technologies at existing nuclear power plants for online monitoring and prognostics. The current state-of-the-art for on-line monitoring applied to active components (eg pumps, valves, motors) and passive structure (eg core internals, primary piping, pressure vessel, concrete, cables, buried pipes) is being reviewed. This includes looking at the current deployment of systems that monitor reactor noise, acoustic signals and vibration in various forms, leak monitoring, and now increasingly condition-based maintenance (CBM) for active components. The NDE and on-line monitoring projects are designed to look beyond locally monitored CBM. Current trends include centralized plant monitoring of SSC, potential fleet-based CBM and technology that will enable operation and maintenance to be performed with limited on-site staff. Attention is also moving to systems that use online monitoring to permit longer term operation (LTO), including a prognostic or predictive element that estimates a remaining useful life (RUL). Many, if not all, active components (pumps, valves, motors etc.) can be well managed, routinely diagnosed, analyzed and upgraded as needed using a combination of periodic and online CBM. The ability to successfully manage passive systems and structures is seen as the key to LTO, particularly in the USA. New approaches will be demonstrated, including prognostics for passive structures, which is critical to maintaining safety and availability and to reducing operations and maintenance costs for NPP's. To provide proactive on-line monitoring that includes estimates for RUL new projects will include advanced sensors, better understanding of stressors and challenges faced in quantification of uncertainty associated with RUL. This program area will leverage insights from past experience in other industries and seek to demonstrate the feasibility of on-line monitoring and prognostics to support NPP LTO.

Bond, Leonard J.

2011-02-01T23:59:59.000Z

31

Adult Routine Physical This health plan covers routine physical exams furnished by a General Hospital, Community  

E-Print Network [OSTI]

covered related services). 1 #12;Pediatric Routine Physical This health plan covers routine pediatric careAdult Routine Physical This health plan covers routine physical exams furnished by a General Hospital, Community Health Center, Physician, Nurse Practitioner, Nurse Midwife or Independent Lab

Oppo, Delia W.

32

Computerized Maintenance Management Systems  

Broader source: Energy.gov [DOE]

Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff.

33

Categorical Exclusion for Maintenance Work  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

34

Predictive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Maintenance Predictive Maintenance October 7, 2013 - 9:46am Addthis Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration. Predictive maintenance differs from preventive maintenance because maintenance is based on the condition of the machine instead of a preset schedule. This eliminates the unneeded maintenance concerns of preventive programs. Several predictive maintenance technologies are available. Federal agencies can leverage a combination of these technologies within their maintenance programs. Advantages A well-executed predictive maintenance program can almost eliminate catastrophic equipment failure because issues are identified and eliminated

35

Home Maintenance Manual.  

E-Print Network [OSTI]

. College Station , Texas l Introduction A regular program of maintenance inspections can help homeowners identify and correct problems before they become serious. Unfortunately, a maintenance problem ignored becomes a major repair. Preventive... maintenance can extend the life of materials and equipment and will be less expensive in the long run than replacement. Maintaining a home need not be difficult, but it requires a regular program of inspection to identify and correct problems before...

Anonymous,

1985-01-01T23:59:59.000Z

36

Operation and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

hosted by Western and requires a digital certificate and login for full access.) Contact Information Transmission Planning Western OATT Revision Maintenance Services Meter Policy...

37

HVAC Maintenance and Technologies  

Broader source: Energy.gov [DOE]

Presentation covers the HVAC maintenance and technologies, and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

38

Advanced Maintenance Services for Promoting Sustainability  

Science Journals Connector (OSTI)

Abstract Ecology and industry, which have been many times considered as antagonists, are now associated together in the sustainability concept to support the three social / economic / environment pillars. In that way, industrial enterprises and more precisely manufacturing ones seek to integrate environment into their strategy by conducting an innovative rationalization of the production as promoted by industrial ecology and circular economy paradigms. This rationalization is favoring the evolution from product to a Product-Service Systems approach (PSS). The continuity of these services is mainly carried out by the maintenance which is no longer an aftermarket service needed for product (system) functionality but rather an inherent service function of the product (system). Thus this paper aims to investigate the role of maintenance to contribute to the development of these paradigms. It is based first on describing the main features of industrial ecology/circular economy transposing the nature concepts to industrial system. It leads to define key principles and levers to be addressed for the development of industrial ecosystems. Then maintenance activity is globally presented allowing, in a second step, to place maintenance services already existing in line with some of these principles and levers (ex. green maintenance), but also to explore advanced maintenance services more able to support promotion of industrial ecosystem by covering others principles and levers. These advanced services can be built from conventional maintenance processes but integrating sustainability goal (ex. prognostics of energy efficiency) or from innovative processes (ex. regenerative management). Finally scientific issues related to these advanced maintenance services are underlining and should concretize future research directions for researchers/practitioners working on maintenance field.

Benoit Iung; Eric Levrat

2014-01-01T23:59:59.000Z

39

Operations and Maintenance Program Structure  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

40

Seasonal Landscape Maintenance  

E-Print Network [OSTI]

Seasonal Landscape Maintenance Oklahoma State University, in compliance with Title VI and VII State University's Department of Horticulture and Landscape Architecture and Oklahoma Cooperative to dry between watering allows plants to develop stronger, deeper roots. However, some landscape plants

Balasundaram, Balabhaskar "Baski"

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Associate Vice Chancellor Maintenance  

E-Print Network [OSTI]

Engineering Capital Planning & Design Carpentry Shop Electrical Shop Plumbing Shop HVAC Shop Housing Shop Equipment & Vehicle Maintenance Warehouse Vehicle Pool Shuttle Post Office Parking Services Contract Management Water Distribution Heat & Power Generation Heat Distribution Power Distribution December 2012

Hartman, Chris

42

Operations and Maintenance  

Broader source: Energy.gov [DOE]

Lower operations and maintenance (O&M) costs are critical to reducing a solar system's lifecycle cost of ownership. O&M costs are influenced by up-front investments in design, engineering,...

43

DOE-TSPP-9, Maintenance of DOE Technical Standards - July 1, 2009 |  

Broader source: Energy.gov (indexed) [DOE]

DOE-TSPP-9, Maintenance of DOE Technical Standards - July 1, 2009 DOE-TSPP-9, Maintenance of DOE Technical Standards - July 1, 2009 DOE-TSPP-9, Maintenance of DOE Technical Standards - July 1, 2009 Technical Standards Program Procedures (TSPP) - August 26, 2009 This procedure provides guidance for the routine maintenance of DOE Technical Standards. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, and laboratories (hereafter referred to collectively as "DOE Components") working to the latest revision of DOE Order 252.1, "Technical Standards Program." DOE-TSPP-9, Maintenance of DOE Technical Standards - July 1, 2009 More Documents & Publications DOE-TSPP-9, Maintenance of DOE Technical Standards - August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS

44

DOE-TSPP-9, Maintenance of DOE Technical Standards - August 1, 2000 |  

Broader source: Energy.gov (indexed) [DOE]

DOE-TSPP-9, Maintenance of DOE Technical Standards - August 1, 2000 DOE-TSPP-9, Maintenance of DOE Technical Standards - August 1, 2000 DOE-TSPP-9, Maintenance of DOE Technical Standards - August 1, 2000 Technical Standards Program Procedures (TSPP) This procedure provides guidance for the routine maintenance of DOE Technical Standards. This procedure applies to all DOE Headquarters and field organizations, management and operating contractors, and laboratories (hereafter referred to collectively as "DOE Components") working to the latest revision of DOE Order 252.1, "Technical Standards Program." DOE-TSPP-9, Maintenance of DOE Technical Standards - August 1, 2000 More Documents & Publications DOE-TSPP-9, Maintenance of DOE Technical Standards - July 1, 2009 MAINTENANCE OF DOE TECHNICAL STANDARDS

45

Decontamination and decommissioning surveillance and maintenance report for FY 1991  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D D) Program has three distinct phases: (1) surveillance and maintenance (S M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D D is devoted to S M at each of the sites. Our S M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

46

Cryogenic neutron protein crystallography: routine methods and potential benefits  

Science Journals Connector (OSTI)

This article highlights routine methods and the benefits of collecting cryogenic macromolecular neutron diffraction data.

Coates, L.

2014-06-14T23:59:59.000Z

47

Routine Form EIA-895 Edit Checks Each  

Gasoline and Diesel Fuel Update (EIA)

Routine Routine Form EIA-895 Edit Checks Each filing of the Form EIA-895 is manually checked for reasonableness and mathematical accuracy. Volumes are converted, as necessary, to a standard 14.73 psia pressure base. Value data are compared to the previous year's data for reasonableness. When data on nonhydrocarbon gases re- moved, gas vented and flared, and gas used for repressuring are not reported for a State that historically reported one or more of these items, a volume is imputed. The imputation is based on the average ratio of gas volumes in the missing category to total gross withdrawals in States with values reporting gas in that category. This average ratio is applied to the volume of total gross withdrawals reported by the State to calculate the volume for the missing items. State agencies are contacted by telephone in order to correct errors. Amended filings or resubmissions are not

48

Routine Operational Environmental Monitoring schedule, CY 1994  

SciTech Connect (OSTI)

This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

Schmidt, J.W.

1993-12-01T23:59:59.000Z

49

Farm Out Maintenance Headaches  

Science Journals Connector (OSTI)

TIDEWATER OIL chalked up a number of firsts with its new Delaware refinery. The size and modern design of the plant drew a lot of attention and over-shadowed what may eventually be the most significant "first"—contract instrument maintenance.At the giant ...

1957-08-26T23:59:59.000Z

50

Operations and maintenance philosophy  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

DUNCAN, G.P.

1999-10-28T23:59:59.000Z

51

Reactive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reactive Maintenance Reactive Maintenance Reactive Maintenance October 7, 2013 - 9:40am Addthis Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities. Advantages Reactive maintenance advantages are a double-edged sword. Federal agencies following a purely reactive maintenance strategy can expect little expenditures for manpower or system upkeep until something breaks. However, systems do break. With new equipment, Federal agencies can expect minimal incidents of failure. However, older equipment often experiences higher failure incidents and costlier repairs. Other advantages of reactive maintenance are:

52

Preventive Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Preventive Maintenance Preventive Maintenance Preventive Maintenance October 7, 2013 - 9:44am Addthis Preventive maintenance aims to sustain or extend system lifespan through a set of actions that detect, preclude, or mitigate system degradation. These actions are based on either calendar time or machine run time. Advantages Federal agencies can greatly extend equipment reliability and lifespan by expending the necessary resources for regular maintenance. In most cases, the system designer or manufacturer outlines regular maintenance under a preventive strategy. In addition to increased reliability and lifespan, budget is saved over the life of the system. Preventive maintenance programs can save as much as 12% to 18% in equipment repair and replacement. Other advantages of preventitive maintenance are:

53

Maintenance strategies to improve sootblower availability  

SciTech Connect (OSTI)

Sootblowers are electromechanical devices used for removal of ash and slag deposits from boiler tube surfaces. By directing steam, air, or water cleaning medium through a nozzle to remove deposits from boiler tubes, boilers are kept on-line for longer periods of time reducing the need for outages to clean the boiler by mechanical means. Fuel must be burned efficiently to minimize stagging and fouling of the heat transfer surfaces. Tuning the boiler to maximize combustion efficiency should not be limited to optimizing fuel conditions, air-fuel ratios, firing rates, excess air, and over-fire air, but should also include the use of sootblowers. The goal is to know when to clean, and if the cleaning cycle has effectively removed the deposit and increased heat transfer. Today, boiler cleaning technology not only focuses on the impact of the sootblowing system on overall boiler performance, but it also focuses on design improvements that impact an individual sootblower`s performance. Proper sootblower maintenance is an integral part of making existing designs and new designs work. Existing computer technologies provide a viable means of documenting and trending sootblower performance data and maintenance history. The personal computer and the availability of spreadsheet and database software make the task of quantifying sootblower performance data and maintenance history easier to achieve. The difficult task is gathering the proper data to make decisions about sootblowing operations and maintenance. The balance of this paper will discuss typical maintenance practices, and improvements that can be achieved by documenting sootblowing system inspections and maintenance activity using a personal computer database.

Walther, J.M.; Whitehead, B.K.

1996-07-01T23:59:59.000Z

54

The Maintenance of Solar Energy  

Science Journals Connector (OSTI)

... this short essay is not satisfied with the current ideas as to the maintenance of solar ...solarenergy ...

1899-10-26T23:59:59.000Z

55

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

2 Why O&M? 2 Why O&M? � 2.1 Introduction Effective O&M is one of the most cost-effective methods for ensuring reliability, safety, and energy efficiency. Inadequate maintenance of energy-using systems is a major cause of energy waste in both the Federal Government and the private sector. Energy losses from steam, water and air leaks, uninsulated lines, maladjusted or inoperable controls, and other losses from poor maintenance are often considerable. Good maintenance practices can generate substantial energy savings and should be considered a resource. Moreover, improvements to facility maintenance programs can often be accomplished immediately and at a relatively low cost. 2.2 Definitions Operations and Maintenance are the decisions and actions regarding the control and upkeep of

56

Microsoft Word - CX-RiceFlatsSiteMaintenanceFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

12, 2012 12, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Steve Lowder Project Manager - TESM-AMPN-2 Proposed Action: Rice Flats Electrode Site Maintenance and Inspection Project Budget Information: Work Order #00219387 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance activities Location: The proposed project area is approximately seven miles southeast of The Dalles,

57

HVAC Maintenance and Technologies  

Broader source: Energy.gov (indexed) [DOE]

HVAC - HVAC - Maintenance and Technologies Federal Utility Partnership Working Group Meeting Providence, Rhode Island April 15, 2010 BY Ramin Faramarzi, P.E. Technology Test Centers (TTC) Design and Engineering Services Southern California Edison (SCE) www.sce.com/rttc 2 Outline * Introduction to SCE's TTC * Overview of energy challenges in California (CA) * Role of HVAC in CA's energy and demand equations * Factors affecting HVAC performance * Focus on SCE's research on maintenance faults * Next generation of HVAC equipment * HVAC technologies on SCE's TTC radar * Black boxes - do they all work? 3 SCE's Technology Test Centers * SCE applied research facilities located in Irwindale, CA comprised of 3 test beds: * Refrigeration * HVAC * Lighting * Coming Soon! - A new ZNE lab 4 Refrigeration Testing

58

care and maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Care and Maintenance of the Prairie Parcel Care and Maintenance of the Prairie Parcel Now that your prairie parcel is up and growing, there are just a few concerns that you should consider about its care. Weeding The question of weeding is really just a matter of aesthetics. You do not have to weed your parcel. If your parcel is a large one, weeding may not even be practical. Although the "weed" species will dominate your parcel for the first few years, they will give way to the native plant species. You can liken the native plants to long distance runners; they appear to start off slowly, but end up winning the ecological race. After all, they are the plants that are genetically-suited and adapted to growing in this environment. The native prairie plants will be developing extensive root structure the

59

HFIR Plant Maintenance - August  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

wave launcher EBW launcher moveable diagnostic disk-target ballast tank magnetic field lines magnets Physics Integration eXperiment (PhIX) helicon plasma electron heating...

60

Federal Energy Management Program: Maintenance Types  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Types Maintenance Types to someone by E-mail Share Federal Energy Management Program: Maintenance Types on Facebook Tweet about Federal Energy Management Program: Maintenance Types on Twitter Bookmark Federal Energy Management Program: Maintenance Types on Google Bookmark Federal Energy Management Program: Maintenance Types on Delicious Rank Federal Energy Management Program: Maintenance Types on Digg Find More places to share Federal Energy Management Program: Maintenance Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources Contacts

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation  

Broader source: Energy.gov (indexed) [DOE]

42: Reauthorization of Permits, Maintenance, and Vegetation 42: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah Summary This EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx.

62

Lawn Maintenance Safety  

E-Print Network [OSTI]

with lawn and garden tools, more than half involving riding lawn mowers and garden tractors. You can avoid accidents like these by making safety a regular part of lawn maintenance, particularly when using lawn mowers and other power tools. Lawn Mowers... mowers save homeowners valuable time and energy. These small tractors are much more powerful than walk-behind mowers and move two to three times as fast. To avoid accidents on riding mowers or larger tractors, it is important to use safe driving...

Smith, David

2005-07-12T23:59:59.000Z

63

Harmful routines? Uncertainty in science and conflicting views on routine petroleum operations in Norway  

Science Journals Connector (OSTI)

Abstract Offshore petroleum activities are the focus of highly politicised debates globally. Typically, public debate is sparked by catastrophic events, such as the 2010 oil spill in the Gulf of Mexico, and decision-making processes fuelled by the assessment of ‘worst-case scenarios’. However, everyday ‘routine’ petroleum operations also impact the marine ecosystems and adjoining socio-economic sectors, but the extent and severity of the impacts are uncertain. This paper takes as its point of departure routine operations and their surrounding uncertainties. Particularly, it focuses on the debates of whether to extend routine petroleum operations in vulnerable and valuable parts of Norway, such as the Lofoten area and the Sula Ridge. These conflicts draw on important and for some, epistemological uncertainties that surround the impacts of routine operations. The paper argues that it is necessary to first highlight these uncertainties, rather than marginalise them, and second, recognise that uncertainties are not simply a scientific challenge, but can be a powerful political tool. This paper unpacks and explores uncertainties associated with three phases of routine operations, that are used to steer political actions: (i) the impacts of seismic surveys on fish and marine mammals; (ii) the impacts of drilling mud and drill cuttings on benthic communities such as deep-sea coral reefs; and (iii) the impacts of produced water on the marine environment. The paper discusses the importance of transparency in addressing these uncertainties, and emphasises the need to implement the precautionary principle in a more participatory way. It thus proposes participatory exercises in order to allow the recognition of the epistemological nature of uncertainties.

Anne Blanchard; Kjellrun Hiis Hauge; Gisle Andersen; Jan Helge Fosså; Bjørn Einar Grøsvik; Nils Olav Handegard; Matthias Kaiser; Sonnich Meier; Erik Olsen; Frode Vikebø

2014-01-01T23:59:59.000Z

64

Machine Maintenance Integrated Performance Support System  

SciTech Connect (OSTI)

The objectives of this partnership project were to develop a preventive maintenance checklist program, a troubleshooting system for the Vertical Turning Center (VTC)-5, an on-line manual, and to integrate these components with a custom browser that would run on the VTC-5 machine's controller and would support future internet/intranet delivery. Kingsbury provided subject matter experts from engineering, manufacturing, and technical support. They also provided photographs, schematics, and CAD drawings, which AlliedSignal Federal Manufacturing and Technologies (ASFM and T) digitized for use in the final program. Information from The Kingsbury troubleshooting experts were interviewed regarding symptoms and root causes of system malfunctions This knowledge was captured and from it, fault trees were developed. These trees were then incorporated into the EPSS as a troubleshooting tool. The troubleshooting portion of the system presents simple questions to the machine operator in order to determine the likely cause or causes of malfunctions and then recommends systematic corrective actions. The on-line reference manual, covering operations and maintenance, provides text and illustrations to the machine operator in a traditional structure, but additionally offers the capability to search voluminous amounts of technical data and retrieve specific information on request. The maintenance portion of the EPSS includes checklists that are displayed daily, weekly, monthly, and annually, as appropriate, on the VTC-5 controller screen. The controller software is unavailable for machining parts until the machine tool operator goes through and checks off all of the checklist items. This project provided the team with a detailed understanding of the knowledge and information required to produce and support advanced machine tools. In addition, it resulted in the design and construction of a prototype VTC-5 EPSS containing all the logic and interfaces necessary to integrate operations and maintenance information from other Kingsbury machine tools.

Bohley, M.C.; Schwartz, M.E.

1998-03-11T23:59:59.000Z

65

Reliability-Centered Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

66

Federal Energy Management Program: Reactive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reactive Reactive Maintenance to someone by E-mail Share Federal Energy Management Program: Reactive Maintenance on Facebook Tweet about Federal Energy Management Program: Reactive Maintenance on Twitter Bookmark Federal Energy Management Program: Reactive Maintenance on Google Bookmark Federal Energy Management Program: Reactive Maintenance on Delicious Rank Federal Energy Management Program: Reactive Maintenance on Digg Find More places to share Federal Energy Management Program: Reactive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

67

Federal Energy Management Program: Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance on Google Bookmark Federal Energy Management Program: Operations and Maintenance on Delicious Rank Federal Energy Management Program: Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Major Equipment Types Resources

68

Federal Energy Management Program: Preventive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Preventive Preventive Maintenance to someone by E-mail Share Federal Energy Management Program: Preventive Maintenance on Facebook Tweet about Federal Energy Management Program: Preventive Maintenance on Twitter Bookmark Federal Energy Management Program: Preventive Maintenance on Google Bookmark Federal Energy Management Program: Preventive Maintenance on Delicious Rank Federal Energy Management Program: Preventive Maintenance on Digg Find More places to share Federal Energy Management Program: Preventive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types

69

Tim Kuneli, Electronics Maintenance Group  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tim Kuneli, Electronics Maintenance Group Print The recent ALS power supply failure was one of the most challenging projects that Electronics Engineer Technical Superintendent Tim...

70

Turfgrass: Maintenance Costs in Texas.  

E-Print Network [OSTI]

LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost... LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost...

Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

1964-01-01T23:59:59.000Z

71

Sustainability of green space maintenance  

E-Print Network [OSTI]

In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

Nomura, Wataru

2011-01-01T23:59:59.000Z

72

Maintenance Types | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

prevent failure, or ensure life of the system even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time...

73

Mechanical Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Holiday Work Status Holiday Work Status Mechanical Operations & Maintenance Group APS Storage Ring Magnets The Advanced Photon Source (APS) at the Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The 1.1-km circumference APS facility consists of several major subsystems including magnets, vacuum chambers, radio-frequency cavities, diagnostics instrumentation, x-ray absorbers and apertures, and cooling water subsystems. Each of these subsystems contains hundreds of mechanical

74

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov (indexed) [DOE]

Reactor Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor More Documents & Publications CRAD, Safety Basis - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor

75

CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II |  

Broader source: Energy.gov (indexed) [DOE]

Idaho Accelerated Retrieval Project Phase II Idaho Accelerated Retrieval Project Phase II CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II Feburary 2006 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho National Laboratory, Idaho Accelerated Retrieval Project Phase II. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Idaho Accelerated Retrieval Project Phase II More Documents & Publications CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility

76

CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility |  

Broader source: Energy.gov (indexed) [DOE]

Los Alamos National Laboratory TA 55 SST Los Alamos National Laboratory TA 55 SST Facility CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Los Alamos National Laboratory TA 55 SST Facility More Documents & Publications CRAD, Maintenance - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Configuration Management - Los Alamos National Laboratory TA 55 SST

77

Landscape Maintenance Considerations for Homeowner  

E-Print Network [OSTI]

Landscape Maintenance Considerations for Homeowner Associations: Save Money, Be Safe, Look Good is getting their money's worth from the landscape maintenance company. Photo credit: Asset Landscaping! Kelly Murray Young Haley Paul #12;1. Consider landscape plants a long- term investment · Trees

Sanderson, Mike

78

OpenEI Community - Maintenance  

Open Energy Info (EERE)

maintenance maintenance March 8-9, 2013 http://en.openei.org/community/blog/openei-maintenance-march-8-9-2013  We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend.  We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally.  Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition.maintenance-march-8-9-2013" target="_blank">read more

79

Federal Energy Management Program: Predictive Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to someone by E-mail to someone by E-mail Share Federal Energy Management Program: Predictive Maintenance on Facebook Tweet about Federal Energy Management Program: Predictive Maintenance on Twitter Bookmark Federal Energy Management Program: Predictive Maintenance on Google Bookmark Federal Energy Management Program: Predictive Maintenance on Delicious Rank Federal Energy Management Program: Predictive Maintenance on Digg Find More places to share Federal Energy Management Program: Predictive Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types Reactive Preventive Predictive Reliability-Centered Major Equipment Types Resources

80

Fatigue Reliability-based Inspection and Maintenance Planning of Gearbox Components in Wind Turbine Drivetrains  

Science Journals Connector (OSTI)

Abstract This paper introduces a reliability-based maintenance plan for wind turbine gearbox components. The gears and bearings are graded based on their fatigue damage and a maintenance map is developed to focus on those components with higher probability of fatigue failure and lower level of reliability. The main aim of this paper is to propose a method for developing the “vulnerability map” which can be used by maintenance teams to identify the components with lower reliabilities. The fatigue damage for gears and bearings are calculated at rated wind speed by the SN curve approach. The load duration distribution (LDD) method is used to obtain the stress range cycles for gears and load range cycles for bearings from the load and load effect time series obtained from a global response analysis. During routine inspection and maintenance, the vulnerability map can be used to find the faulty component by inspecting those with highest probability of failure rather than examining all gears and bearings. Such maps can be used for fault detection during routine maintenance and can reduce the down time and efforts of maintenance team to identify the source of problem. The proposed procedure is exemplified by a 750 kW gearbox and a vulnerability map is developed for this case study gearbox.

Amir Rasekhi Nejad; Zhen Gao; Torgeir Moan

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

MaintenanceRecords  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7BA003539 7BA003539 Maintenance Sheet for 2011 Hyundai Sonata Advanced Vehicle Testing Activity HEV Fleet Testing Date Mileage Description Cost 7/19/2011 5,720 Changed oil and filter $14.67 10/12/2011 11,152 Changed oil and filter and rotated tires $60.49 10/21/2011 12,342 Upgraded ECU (TG5), replaced NVLD pressure sensor (TG6), and replaced cooling fan resistor (TG8) warranty 11/21/2011 16,442 Changed oil and filter $43.22 12/20/2011 22,497 Changed oil and filter and rotated tires $56.85 1/24/2012 28,205 Changed oil and filter $41.85 2/6/2012 30,100 30K service $109.16 2/9/2012 30,460 Recall: replaced two high voltage connectors at the HPCU n/c 2/27/2012 33,208 Changed oil and filter and rotated tires $56.85 3/24/2012 40,809 Changed oil and filter $41.85 4/20/2012 47,580 Changed oil and filter and rotated tires

82

The International Coal Statistics Data Base program maintenance guide  

SciTech Connect (OSTI)

The International Coal Statistics Data Base (ICSD) is a microcomputer-based system which contains information related to international coal trade. This includes coal production, consumption, imports and exports information. The ICSD is a secondary data base, meaning that information contained therein is derived entirely from other primary sources. It uses dBase III+ and Lotus 1-2-3 to locate, report and display data. The system is used for analysis in preparing the Annual Prospects for World Coal Trade (DOE/EIA-0363) publication. The ICSD system is menu driven and also permits the user who is familiar with dBase and Lotus operations to leave the menu structure to perform independent queries. Documentation for the ICSD consists of three manuals -- the User's Guide, the Operations Manual, and the Program Maintenance Manual. This Program Maintenance Manual provides the information necessary to maintain and update the ICSD system. Two major types of program maintenance documentation are presented in this manual. The first is the source code for the dBase III+ routines and related non-dBase programs used in operating the ICSD. The second is listings of the major component database field structures. A third important consideration for dBase programming, the structure of index files, is presented in the listing of source code for the index maintenance program. 1 fig.

Not Available

1991-06-01T23:59:59.000Z

83

Operations and maintenance report on Air Force oil/water separators. Final report, September 1985-August 1986  

SciTech Connect (OSTI)

This report is intended to provide general guidance for the routine operation and maintenance of oil/water separators. The report should help managers and operators to recognize and correct problems affecting the separation process of oil and water. The most common types of gravity separators used by the Air Force are discussed. Other topics include operation guidelines, flow measurements, maintenance service, waste disposal and regulations, sampling and testing, recordkeeping and spill-prevention measures.

Kilroy, M.D.

1986-10-01T23:59:59.000Z

84

ARM - Field Campaign - Routine AAF CLOWD Optical Radiative Observations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govCampaignsRoutine AAF CLOWD Optical Radiative Observations (RACORO) govCampaignsRoutine AAF CLOWD Optical Radiative Observations (RACORO) Campaign Links RACORO Website Related Campaigns Surface Radiation Comparison Transfer Measurements for RACORO 2009.01.20, Long, SGP Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : Routine AAF CLOWD Optical Radiative Observations (RACORO) 2009.01.22 - 2009.06.30 Website : http://acrf-campaign.arm.gov/racoro/ Lead Scientist : Andrew Vogelmann For data sets, see below. Description The ARM Aerial Facility (AAF) supported the Routine AAF Clouds with Low Optical Water Depths (CLOWD) Optical Radiative Observations (RACORO) field campaign, led by principal investigator Andrew Vogelmann. During this long-term campaign, the AAF conducted routine flights at the ACRF Southern

85

Federal Energy Management Program: Computerized Maintenance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Computerized Computerized Maintenance Management Systems to someone by E-mail Share Federal Energy Management Program: Computerized Maintenance Management Systems on Facebook Tweet about Federal Energy Management Program: Computerized Maintenance Management Systems on Twitter Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Google Bookmark Federal Energy Management Program: Computerized Maintenance Management Systems on Delicious Rank Federal Energy Management Program: Computerized Maintenance Management Systems on Digg Find More places to share Federal Energy Management Program: Computerized Maintenance Management Systems on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

86

Operations and Maintenance | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be...

87

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Operations and Maintenance Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems...

88

factsheet - trees and power lines - July 2008  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Trees and power lines July 2008 This summer, BPA maintenance crews are inspecting and clearing high-growing vegetation from all 8,500- miles (15,000 circuit miles) of our...

89

Operations and Maintenance Management Support  

Broader source: Energy.gov [DOE]

Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

90

Cleaning, Maintenance, and Janitorial Needs  

Science Journals Connector (OSTI)

The contamination control facility, including all items that may come into contact with products, requires regular maintenance and cleaning. The products produced in the cleanroom facility are typically sensitive...

Alvin Lieberman

1992-01-01T23:59:59.000Z

91

Sustainable Operations & Maintenance Implementation Support  

E-Print Network [OSTI]

, and purchasing policy: Energy efficiency cannot exist without accountability and organizational support energy efficiency in buildings. Organizational innovation for energy conservation; Organizations face of energy efficiency. Meetings with facilities personnel, maintenance staff, building managers, building oc

92

Maintenance Practices for LED Streetlights  

Broader source: Energy.gov [DOE]

This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

93

Operations and Maintenance Program Measurement  

Broader source: Energy.gov [DOE]

Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

94

Maintenance of DOE Technical Standards  

Broader source: Energy.gov (indexed) [DOE]

TECHNICAL STANDARDS TECHNICAL STANDARDS PROGRAM PROCEDURES DOE-TSPP-9 Revision: 5 Date: August 1, 2000 MAINTENANCE OF DOE TECHNICAL STANDARDS U.S. Department of Energy Office of Nuclear Safety Policy and Standards Washington, D.C. 20585 DOE-TSPP-9 Maintenance Revision: 5 Date: August 1, 2000 DOE Technical Standards Program i CONTENTS Paragraph Page 1. SCOPE........................................................................................................................................... 1 1.1 Purpose ................................................................................................................... 1 1.2 Applicability.............................................................................................................. 1

95

HFIR Plant Maintenance - August  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

June 2012 June 2012 2 Managed by UT-Battelle for the U.S. Department of Energy ORNL Isotope Infrastructure helicon launcher whistler wave launcher EBW launcher moveable diagnostic disk-target ballast tank magnetic field lines magnets Physics Integration eXperiment (PhIX) helicon plasma electron heating flow back neutral & plasma density control plasma heat flux * PhIX investigates the addition of electron heating to helicon plasma - the first building blocks of the new high-intensity plasma source needed by a powerful plasma materials test station. - Heating of helicon plasma electrons - Effects back on helicon plasma production - Neutral and plasma density control - RF power-to-plasma heat flux efficiency - Effects of plasma and impurity flow-back

96

Decontamination and decommissioning surveillance and maintenance report for FY 1991. Environmental Restoration Program  

SciTech Connect (OSTI)

The Decontamination and Decommissioning (D&D) Program has three distinct phases: (1) surveillance and maintenance (S&M); (2) decontamination and removal of hazardous materials and equipment (which DOE Headquarters in Washington, D.C., calls Phase I of remediation); and (3) decommissioning and ultimate disposal, regulatory compliance monitoring, and property transfer (which DOE Headquarters calls Phase II of remediation). A large part of D&D is devoted to S&M at each of the sites. Our S&M activities, which are performed on facilities awaiting decommissioning, are designed to minimize potential hazards to human health and the environment by: ensuring adequate containment of residual radioactive and hazardous materials; and, providing physical safety and security controls to minimize potential hazards to on-site personnel and the general public. Typically, we classify maintenance activities as either routine or special (major repairs). Routine maintenance includes such activities as painting, cleaning, vegetation control, minor structural repairs, filter changes, and building system(s) checks. Special maintenance includes Occupational Safety and Health Act facility upgrades, roof repairs, and equipment overhaul. Surveillance activities include inspections, radiological measurements, reporting, records maintenance, and security (as required) for controlling and monitoring access to facilities. This report summarizes out FY 1991 S&M activities for the Tennessee plant sites, which include the K-25 Site, the Gas Centrifuge facilities, ORNL, and the Y-12 Plant.

Not Available

1991-12-01T23:59:59.000Z

97

Operations & Maintenance Best Practices Guide: Chapter 3  

Broader source: Energy.gov [DOE]

Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

98

Chapter 6.14 PROPERTY MAINTENANCE  

E-Print Network [OSTI]

Chapter 6.14 PROPERTY MAINTENANCE Sections: 6.14.010 Findings. 6.14.020 Landscape Maintenance. 6 of landscaping and/or landscape maintenance on private property, including overgrown, dead, or decayed vegetation of the residents of the City of Riverside. (Ord. 6970 § 2, 2007) Section 6.14.020 Landscape maintenance. A

Lyubomirsky, Ilya

99

Module 10: Maintenance and Fueling Guidelines  

Broader source: Energy.gov [DOE]

This course covers safety guidelines for hydrogen, safe maintenance facilities, safety guidelines for hydrogen fueling facilities

100

CRAD, Maintenance Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Assessment Plan Maintenance Assessment Plan CRAD, Maintenance Assessment Plan Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of parts, materials, and services needed to support the

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Efficiency Lighting & Maintenance Inc | Open Energy Information  

Open Energy Info (EERE)

Efficiency Lighting & Maintenance Inc Efficiency Lighting & Maintenance Inc Jump to: navigation, search Name Efficiency Lighting & Maintenance Inc Address 5a Del Mar Drive Place Brookfield, Connecticut Zip 06804 Sector Buildings Product Energy Service Company (ESCO) Website http://www.el-m.net/ Coordinates 41.453066°, -73.401583° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.453066,"lon":-73.401583,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

102

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov (indexed) [DOE]

Reactor Contractor ORR Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR February 2007 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR More Documents & Publications CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor

103

Drive alignment pays maintenance dividends  

SciTech Connect (OSTI)

Proper alignment of the motor and gear drive on conveying and processing equipment will result in longer bearing and coupling life, along with lower maintenance costs. Selecting an alignment free drive package instead of a traditional foot mounted drive and motor is a major advancement toward these goals. 4 photos.

Fedder, R. [Rexnord Industries, Milwaukee, WI (United States)

2008-12-15T23:59:59.000Z

104

Dynamic Maintenance of Service Orchestrations  

E-Print Network [OSTI]

-Rocquencourt, France Valérie Issarny INRIA Paris-Rocquencourt, France ABSTRACT Service-oriented architectures evolved/orchestration of services. One of the next challenges in this field is the maintenance of service-oriented architectures orchestrations. 1. INTRODUCTION Service Oriented Architecture (SOA) is an architectural style that emerged

Boyer, Edmond

105

Lessons from shielding retrofits at the LAMPF/LANSCE/PSR accelerator, beam lines and target facilities  

SciTech Connect (OSTI)

The experience in the past 7 years to improve the shielding and radiation control systems at the Los Alamos Meson Physics Facility (LAMPF) and the Manuel Lujan Jr. Neutron Scattering Center (LANSCE) provides important lessons for the design of radiation control systems at future, high beam power proton accelerator facilities. Major issues confronted and insight gained in developing shielding criteria and in the use of radiation interlocks are discussed. For accelerators and beam lines requiring hands-on-maintenance, our experience suggests that shielding criteria based on accident scenarios will be more demanding than criteria based on routinely encountered beam losses. Specification and analysis of the appropriate design basis accident become all important. Mitigation by active protection systems of the consequences of potential, but severe, prompt radiation accidents has been advocated as an alternate choice to shielding retrofits for risk management at both facilities. Acceptance of active protection systems has proven elusive primarily because of the difficulty in providing convincing proof that failure of active systems (to mitigate the accident) is incredible. Results from extensive shielding assessment studies are presented including data from experimental beam spill tests, comparisons with model estimates, and evidence bearing on the limitations of line-of-sight attenuation models in complex geometries. The scope and significant characteristics of major shielding retrofit projects at the LAMPF site are illustrated by the project to improve the shielding beneath a road over a multiuse, high-intensity beam line (Line D).

Macek, R.J.

1994-07-01T23:59:59.000Z

106

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

107

Guide to good practices for shift routines and operating practices  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, ``Shift Routines and Operating Practices,`` Chapter 2 of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing shift routines and operating practices. ``Shift Routines and Operating Practices`` is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a high standard of professional conduct and sound operating practices to promote safe and efficient operations. Recently, guidance pertaining to this element has been strengthened for nuclear power reactors. This additional guidance is given in Appendix C for information purposes. Though this guidance and good practices pertain to nuclear power reactors, DOE sites may choose to use a graded approach for implementing these in nuclear facilities.

NONE

1998-12-01T23:59:59.000Z

108

Guide to good practices for shift routines and operating practices  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Shift Routines and Operating Practices, Chapter H of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities.'' The practices in this guide should be considered when planning or reviewing shift routines and operating practices. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Shift Routines and Operating Practices'' is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a high standard of professional conduct and sound operating practices to promote safe and efficient operations.

Not Available

1993-06-01T23:59:59.000Z

109

Guide to good practices for shift routines and operating practices  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Shift Routines and Operating Practices, Chapter H of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities.`` The practices in this guide should be considered when planning or reviewing shift routines and operating practices. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. ``Shift Routines and Operating Practices`` is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a high standard of professional conduct and sound operating practices to promote safe and efficient operations.

Not Available

1993-06-01T23:59:59.000Z

110

Reliability-based maintenance evaluations and standard preventive maintenance programs  

SciTech Connect (OSTI)

Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the [open quotes]Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[close quotes] prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated ([approximately]50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized.

Varno, M. (Vermont Yankee Nuclear Power Corp., Vernon, VT (United States)); McKinley, M. (Quadrex Energy Services Corp., Campbell, CA (United States))

1993-01-01T23:59:59.000Z

111

Don't water down: Enhance content learning through the unit organizer routine  

E-Print Network [OSTI]

The writer considers a content enhancement routine called the unit organizer routine. This routine focuses on how a teacher introduces, builds, and gains closure on a content area unit's critical ideas and information. In ...

Bouda, Daniel J.; Lenz, B. Keith; Bulgren, Janis A.; Schumaker, Jean B.; Deshler, Donald D.

2000-01-01T23:59:59.000Z

112

Computerized Maintenance Management Systems | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations & Maintenance » Computerized Program Areas » Operations & Maintenance » Computerized Maintenance Management Systems Computerized Maintenance Management Systems October 7, 2013 - 9:35am Addthis Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The software automates most of the logistical functions performed by O&M staff. Capabilities Typical CMMS functions depend on the complexity of the system chosen. Examples include: Work order generation, prioritization, and tracking by equipment and/or component. Work orders often can be sorted by equipment, date, person responding, etc. Tracking scheduled and unscheduled maintenance activities Storing technical documentation and maintenance procedures by

113

Federal Energy Management Program: Maintenance Types  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Types Maintenance Types Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the following can ensure an optimal blend of cost and life-cycle effectiveness: Reactive Maintenance: Follows a "run it until it breaks" strategy. No action or effort is taken to maintain equipment, prevent failure, or ensure life of the system - even if actions are suggested by the manufacturer. Preventive Maintenance: Refers to a series of actions performed on calendar time or machine run time schedules. Predictive Maintenance: Strives to detect the onset of equipment degradation and address the problems as they are identified. Several predictive maintenance technologies exist.

114

Maintenance cost studies of present aircraft subsystems  

E-Print Network [OSTI]

This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

Pearlman, Chaim Herman Shalom

1966-01-01T23:59:59.000Z

115

Invertible Program Restructurings for Continuing Modular Maintenance  

E-Print Network [OSTI]

Invertible Program Restructurings for Continuing Modular Maintenance Julien Cohen ASCOLA team (EMN in main- tenance with invertible program transformations. We illustrate this on the typical Expression problems with our approach. Keywords-modular maintenance; restructuring; invertible pro- gram

Paris-Sud XI, Université de

116

Effects of dairy intake on weight maintenance  

E-Print Network [OSTI]

, randomized trial. Weight loss was baseline to 3 months, weight maintenance was 4 to 9 months. Participants were maintained randomly assigned to low dairy ( 3 servings/d) diets for the maintenance phase. Three...

Zemel, Michael B.; Donnelly, Joseph E.; Smith, Bryan K.; Sullivan, Debra K.; Richards, Joanna; Morgan-Hanusa, Danielle; Mayo, Matthew S.; Sun, Xiaocun; Cook-Wiens, Galen; Bailey, Bruce W.; Van Walleghen, Emily L.; Washburn, Richard A.

2008-10-24T23:59:59.000Z

117

Operations & Maintenance Best Practices Guide: Chapter 9  

Broader source: Energy.gov [DOE]

Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

118

Operations & Maintenance Best Practices Guide: Front Matter  

Broader source: Energy.gov [DOE]

Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

119

Operations & Maintenance Best Practices Guide: Appendix c  

Broader source: Energy.gov [DOE]

Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

120

Operations & Maintenance Best Practices Guide: Chapter 7  

Broader source: Energy.gov [DOE]

Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Operations & Maintenance Best Practices Guide: Chapter 5  

Broader source: Energy.gov [DOE]

Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

122

Reliability centered maintenance (RCM) products - future  

SciTech Connect (OSTI)

This paper summarizes products related to RCM of power systems which will soon be available. The titles include: substation RCM handbook and software; substation RCM driven productive maintenance; transmission RCM evaluation; transmission inspection and maintenance workstation; transmission inspection and detection methods; substation RCM implementation and software support; substation maintenance management workstation; transmission RCM handbook and software; transmission inspection and maintenance workstation - TC; distribution RCM handbook and software; transmission RCM implementation and software support; and distribution RCM implementation and software support.

Lyons, P.F.

1996-08-01T23:59:59.000Z

123

Operations & Maintenance Best Practices Guide: Chapter 8  

Broader source: Energy.gov [DOE]

Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

124

Collector Field Maintenance: Distributed Solar Thermal Systems  

Science Journals Connector (OSTI)

This paper reports on recent operation and maintenance experiences with distributed solar thermal systems. Although some information on system-...

E. C. Boes; E. C. Cameron; E. L. Harley

1986-01-01T23:59:59.000Z

125

Preventive Maintenance Strategies for Compressed Air Systems  

Broader source: Energy.gov [DOE]

This tip sheet discusses preventive maintenance strategies for compressed air systems to avoid high equipment repair and replacement costs.

126

Operations & Maintenance Best Practices Guide: Chapter 10  

Broader source: Energy.gov [DOE]

Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

127

Operations & Maintenance Best Practices Guide: Chapter 6  

Broader source: Energy.gov [DOE]

Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

128

Operations & Maintenance Best Practices Guide: Appendix a  

Broader source: Energy.gov [DOE]

Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

129

High power vented nickel-cadmium cells designed for ultra low maintenance  

SciTech Connect (OSTI)

Initially the SAFT program to develop maintenance-free battery technology was in response to a U.S. Air Force commitment to eliminate the need for battery maintenance shops at the line level. The U.S. Navy, through its Crane, Indiana Battery Test Facility, added further demands. They wanted new nickel cadmium battery designs that were lighter, had greater power, more capacity, required much less maintenance, and still met standard Military Specification size requirements. Crane personnel recognized that the major savings in the maintenance costs were achievable in 3- to 5-fold increases of the maintenance period and that non-maintainability was not necessarily a design requisite. In response, SAFT established an internally funded program whose objective was the development of a battery technology that would provide military aircraft batteries meeting these demands.

Scardaville, P.A. (SAFT America, Inc., Valdosta, GA (United States)); Newman, B.C. (Naval Surface Warfare Center, Crane, IN (United States))

1993-05-01T23:59:59.000Z

130

Blythe-Knob\t161-kV\tTransmission\tLine  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Blythe-Knob 161-kV Transmission Line Maintenance Project - Continuation Sheet Project Description (continued) The proposed project also includes vegetation management in one...

131

Laboratory services series: a programmed maintenance system  

SciTech Connect (OSTI)

The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

Tuxbury, D.C.; Srite, B.E.

1980-01-01T23:59:59.000Z

132

EA-1982: Parker-Davis Transmission System Programmatic Operations and Maintenance Project; Arizona, California, and Nevada  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) is preparing an EA to assess potential environmental impacts of the proposed continuation of operations and maintenance activities and implementation of a vegetation management program on Western’s Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance facilities associated with the transmission system.

133

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

134

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

135

Pacific Northwest Laboratory Maintenance Implementation plan  

SciTech Connect (OSTI)

This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory`s (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change {number_sign}3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services` current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

Bright, J.D.

1992-06-01T23:59:59.000Z

136

Building Energy Software Tools Directory: Maintenance Edge  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Maintenance Edge Maintenance Edge Maintenance Edge logo Maintenance Edge is a suite of online Software as a Service (SaaS) facility management tools that gives control and management over buildings without a capital investment. Maintenance Edge enables you to combine work order, planned maintenance, work order wireless, and critical alarms with the option of adding inventory. Fully implemented, Maintenance Edge will cut labor time, increase energy efficiencies, save on capital expenditures, and save on budget and management time. Features include: easy/user-friendly work order requesting, unlimited users, seven different user roles (limits data users can see), no capital or hardware costs required, access to data anywhere anytime, easy-to-click reporting on all the data in your system,

137

Help Line  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Help Line Help Line Ombuds Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns and want advice or referral while preserving confidentiality and anonymity. Callers may remain anonymous and the Help Line does not have caller ID or other methods of identifying callers. The Help Line maintains the same level of confidentiality and neutrality as the other Ombuds services. The Ombuds Help Line is not for reporting emergencies or officially

138

Notices ROUTINE USES OF RECORDS MAINTAINED IN THE SYSTEM, INCLUDING  

Broader source: Energy.gov (indexed) [DOE]

83 Federal Register 83 Federal Register / Vol. 78, No. 51 / Friday, March 15, 2013 / Notices ROUTINE USES OF RECORDS MAINTAINED IN THE SYSTEM, INCLUDING CATEGORIES OF USERS AND THE PURPOSES OF SUCH USES: The Department may disclose information contained in a record in this system of records under the routine uses listed in this system of records without the consent of the individual if the disclosure is compatible with the purposes for which the record was collected. These disclosures may be made on a case-by-case basis or, if the Department has complied with the computer matching requirements of the Privacy Act of 1974, as amended (Privacy Act), under a computer matching agreement. Any disclosure of individually identifiable information from a record in this system must also comply with the requirements of section

139

Cryogenic Neutron Protein Crystallography: routine methods and potential benefits  

SciTech Connect (OSTI)

The use of cryocooling in neutron diffraction has been hampered by several technical challenges such as the need for specialized equipment and techniques. Recently we have developed and deployed equipment and strategies that allow for routine neutron data collection on cryocooled crystals using off the shelf components. This system has several advantages, compared to a closed displex cooling system such as fast cooling coupled with easier crystal mounting and centering. The ability to routinely collect cryogenic neutron data for analysis will significantly broaden the range of scientific questions that can be examined by neutron protein crystallography. Cryogenic neutron data collection for macromolecules has recently become available at the new Biological Diffractometer BIODIFF at FRM II and the Macromolecular Diffractometer (MaNDi) at the Spallation Neutron Source, Oak Ridge National Laboratory. To evaluate the benefits of a cryocooled neutron structure we collected a full neutron data set on the BIODIFF instrument on a Toho-1 lactamase structure at 100K.

Weiss, Kevin L [ORNL; Tomanicek, Stephen J [ORNL; NG, Joseph D [ORNL

2014-01-01T23:59:59.000Z

140

Effects of family routines and family stress on child competencies  

E-Print Network [OSTI]

2006 Major Subject: School Psychology iii ABSTRACT Effects of Family Routines and Family Stress on Child Competencies. (August 2006) Crystal Rene? Hill, B.A., Francis Marion University; M.S., Francis Marion University Chair..., Fuligni, & Brooks-Gunn, 2002). Additionally, better child health (Boyce et al., 1977; Fiese & Wamboldt, 2003a; Fiese & Wamboldt, 2003b; Fiese, Wamboldt, & Anbar, 2005) and overall higher levels of child regulatory control (Fiese...

Hill, Crystal Renee

2006-10-30T23:59:59.000Z

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Geothermal Data Development, Collection, and Maintenance | Open Energy  

Open Energy Info (EERE)

Page Page Edit History Facebook icon Twitter icon » Geothermal Data Development, Collection, and Maintenance Jump to: navigation, search Geothermal ARRA Funded Projects for Geothermal Data Development, Collection, and Maintenance Loading map... {"format":"googlemaps3","type":"ROADMAP","types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"limit":200,"offset":0,"link":"all","sort":[""],"order":[],"headers":"show","mainlabel":"","intro":"","outro":"","searchlabel":"\u2026 further results","default":"","geoservice":"google","zoom":false,"width":"600px","height":"350px","centre":false,"layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","icon":"","visitedicon":"","forceshow":true,"showtitle":true,"hidenamespace":false,"template":false,"title":"","label":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"locations":[{"text":"

142

Plant maintenance and plant life extension issue, 2008  

SciTech Connect (OSTI)

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles include the following: Exciting time to be at the U.S. NRC, by Dale Klein, Nuclear Regulatory Commission; Extraordinary steps to ensure a minimal environmental impact, by George Vanderheyden, UniStar Nuclear Energy, LLC.; Focused on consistent reduction of outages, by Kevin Walsh, GE Hitachi Nuclear Energy; On the path towards operational excellence, by Ricardo Perez, Westinghouse Electric Company; Ability to be refuelled on-line, by Ian Trotman, CANDU Services, Atomic Energy of Canada, Ltd.; ASCA Application for maintenance of SG secondary side, by Patrick Wagner, Wolf Creek Nuclear Operating Corporation, Phillip Battaglia and David Selfridge, Westinghouse Electric Company; and, An integral part of the landscape and lives, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Steam generator bowl drain repairs, by John Makar and Richard Gimple, Wolf Creek Nuclear Operating Corporation.

Agnihotri, Newal (ed.)

2008-03-15T23:59:59.000Z

143

No maintenance -- no energy efficiency  

SciTech Connect (OSTI)

Field investigations illustrate that it is not realistic to expect new high-tech equipment to function for a full life expectancy at high efficiency without significant operations and maintenance (O&M). A simple walk through inspection of most buildings reveals extensive equipment that is being operated on manual override, is incorrectly adjusted and operating inefficiently, or is simply inoperative. This point is illustrated with two examples at Robins Air Force Base, Georgia. The first describes development of a comprehensive, base-wide, steam trap maintenance program. The second describes a measured evaluation from a typical office building. The objective of both examples was to assess the importance of proper O&M. The proposed ``O&M First`` philosophy will result in more efficient building HVAC operation, provide improved services to the building occupants, and reduce energy consumption and unscheduled equipment repair/replacement. Implementation of a comprehensive O&M program will result in a 15--25% energy savings. The O&M foundation that is established will allow other energy conservation activities such is demand side management or energy management and control systems, to achieve and maintain their expected energy savings.

Szydlowski, R.F.; Schliesing, J.S.; Winiarski, D.W.

1994-12-01T23:59:59.000Z

144

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Operations and Maintenance Operations and Maintenance October 16, 2013 - 5:01pm Addthis Project Construction Commissioning Operations & Maintenance Operations and maintenance (O&M) programs are critical to successfully integrating renewable energy into new Federal building construction and major renovations. This overview covers the importance of O&M programs for renewable energy projects, creating a successful O&M program, and identifying the right team to carry out the program. It highlights typical renewable energy issues and recommends following the design, specifications, and recommendations from product manufacturers. Key Actions in Operations and Maintenance Make O&M a priority to protect agency investment. Include O&M input in design reviews.

145

Predictive Maintenance Technologies | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Technologies Maintenance Technologies Predictive Maintenance Technologies October 28, 2013 - 10:15am Addthis Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs. Chapter 6 of the FEMP O&M Best Practices Guide (PDF 721 KB) outlines these technologies in detail. The full guide is also available (PDF 3.3 MB). Predictive maintenance technologies include: Thermography: Infrared imaging is used to generate visual images that identify variations in the infrared radiance of object surfaces. This method can be used to detect system surface wear, leaks, or failures. Lubricant and Wear Particle Analysis (a.k.a. Oil Analysis): Detailed analysis is taken to determine needed maintenance based on lubrication

146

3D Reconstruction of 138 KV Power-lines from Airborne LiDAR Data.  

E-Print Network [OSTI]

??Due to infrequent and imprecise maintenance inspection in power-line corridors, accidents can be caused by interferences, for instance, surrounding trees. Transmission power-line inspection conventionally relies… (more)

Xiang, Qing

2014-01-01T23:59:59.000Z

147

FACILITY MAINTENANCE MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Broader source: Energy.gov (indexed) [DOE]

Facility Facility Maintenance Management Qualification Standard Reference Guide NOVEMBER 2009 Table of Contents i FIGURES...................................................................................................................................... iv TABLES........................................................................................................................................ iv ACRONYMS ................................................................................................................................. v PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

148

FAQS Reference Guide – Facility Maintenance Management  

Broader source: Energy.gov [DOE]

This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

149

Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker  

E-Print Network [OSTI]

and maintenance techniques of the component. The model is based on the concept of representing the component life time by several deterioration stages. Inspection and maintenance is introduced at each stage and model parameters are defined. A sensitivity analysis...

Natti, Satish

2010-01-14T23:59:59.000Z

150

Routine environmental audit of Ames Laboratory, Ames, Iowa  

SciTech Connect (OSTI)

This document contains the findings identified during the routine environmental audit of Ames Laboratory, Ames, Iowa, conducted September 12--23, 1994. The audit included a review of all Ames Laboratory operations and facilities supporting DOE-sponsored activities. The audit`s objective is to advise the Secretary of Energy, through the Assistant Secretary for Environment, Safety and Health, as to the adequacy of the environmental protection programs established at Ames Laboratory to ensure the protection of the environment, and compliance with Federal, state, and DOE requirements.

NONE

1994-09-01T23:59:59.000Z

151

Software Testing and Maintenance 1 Regression Testing  

E-Print Network [OSTI]

1 Software Testing and Maintenance 1 Regression Testing Introduction Test Selection Test Minimization Test Prioritization Summary Software Testing and Maintenance 2 What is it? Regression testing refers to the portion of the test cycle in which a program is tested to ensure that changes do not affect

Lei, Jeff Yu

152

Engines of growth – the importance of 'routine innovation activities'  

Science Journals Connector (OSTI)

This paper adopts a fresh perspective at what companies could do to achieve growth and profitability over the mid- and long-term. Various disciplines of management science have examined the determinants, processes, and consequences of innovation in organisations with mixed and often inconsistent results. While we adopt a perspective of organisational design in innovation management, we differ from conventional approaches in our selecting the free-market economy as the starting point of research. We advocate that organisational design could learn from the system of free-market economy that has been associated with extra-ordinary growth as compared with other economic systems. After analysing the drivers of growth in free-market economy, we discuss the concept of 'routine innovation activities' and its implications from a perspective of organisational design. We advocate that organisations need to be designed with the aim of reaping the growth benefits associated with 'routine activities' and establish a catalogue of principles guiding practitioners of organisational design. The article closes with a case study illustrating the argument.

Ursula Deplazes; Wolfgang Deplazes; Roman Boutellier

2010-01-01T23:59:59.000Z

153

Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Operations and Maintenance Program Areas » Operations and Maintenance Operations and Maintenance October 4, 2013 - 5:07pm Addthis Federal facilities rely on pumps, motors, fans, and other mechanical systems for everyday operations. These systems must be maintained and operated correctly to reach their full potential. Well-executed operations and maintenance (O&M) programs promote energy efficiency and life cycle performance and can save Federal agencies 5% to 20% on annual energy bills without significant capital investments. Learn about: Federal Requirements: Look up O&M-related requirements that Federal agencies must meet as outlined by law and executive order Management Process: Learn about the operations and maintenance management process Commissioning: Get an overview of commissioning processes

154

Federal Energy Management Program: Operations and Maintenance Contacts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Contacts to someone by E-mail Contacts to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Contacts on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Contacts on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Google Bookmark Federal Energy Management Program: Operations and Maintenance Contacts on Delicious Rank Federal Energy Management Program: Operations and Maintenance Contacts on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Contacts on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems Maintenance Types

155

Federal Energy Management Program: Reliability-Centered Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

156

CRAD, Maintenance- Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance Program portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility.

157

CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

158

An on-line regional overpower surveillance system for Candu reactors  

SciTech Connect (OSTI)

The current methodology for establishing Regional Overpower Protection (ROP) trip set-points for Canada Deuterium Uranium (Candu{sup R} reactors requires an extensive and detailed assessment of the plant based on a distribution of channel and bundle powers (flux shapes) calculated from a range of device configurations (e.g., zone controller levels, adjuster bank movements, mechanical control absorber movements, shut-off rod insertions) and a set of thermalhydraulic plant data (channel flows, reactor inlet-header temperatures, channel differential pressure). An on-line approach would provide an interface to assist operators in routine monitoring, diagnostic and maintenance activities by providing Critical Channel Powers (CCP) and ROP set points from instantaneous flux shapes derived from real-time detector readings and associated thermalhydraulic conditions. This paper describes an Advanced On-Line Regional Overpower Surveillance (AOL-ROS) system currently under development at Atomic Energy of Canada Limited (AECL) for Candu reactors. Development has been based on an assessment using instantaneous operating data for the period February to April 2004 from a Candu 6 reactor located at Point Lepreau, New Brunswick (Canada). (authors)

Wallace, D. J.; Caxaj, V.; Seidu, A. S.; Hartmann, W.; Sur, B.; McDonald, A. [Atomic Energy of Canada Limited, 2251 Speakman Dr., Mississauga, Ont. L5K 1B2 (Canada)

2006-07-01T23:59:59.000Z

159

Mutational data loading routines for human genome databases: the BRCA1  

E-Print Network [OSTI]

Mutational data loading routines for human genome databases: the BRCA1 case. Matthijs van der Kroon.089 3508 TB Utrecht The Netherlands MUTATIONAL DATA LOADING ROUTINES FOR HUMAN GENOME DATABASES: THE BRCA1 CASE #12;3 MUTATIONAL DATA LOADING ROUTINES FOR HUMAN GENOME DATABASES: THE BRCA1 CASE. Matthijs van

Utrecht, Universiteit

160

B1.3 SWCX for Routine Custodial Services-  

Broader source: Energy.gov (indexed) [DOE]

Custodial Services- Custodial Services- Revision 0 Introduction Sitewide Categorical Exclusion for Routine Custodial Services As defined in the U.S. Department of Energy's (DOE) Richland Operations Office Integrated Management System Procedure, NEPA Analysis at Hanford, a sitewide categorical exclusion is: An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the same or lesser scope) of DOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO)  

E-Print Network [OSTI]

, Limited Commercial Landscape Maintenance, Ornamental & Turf, Private Ag, or General Standards CORE for Limited Commercial Landscape Maintenance (LCLM), you must attend all day to earn the 6 CEUs required. Limited Commercial Maintenance (LCLM) Limited Lawn & Ornamental (LLO) Training & Exams Date

Florida, University of

162

Long Length Contaminated Equipment Maintenance Plan  

SciTech Connect (OSTI)

The purpose of this document is to provide the maintenance requirements of the Long Length Contaminated Equipment (LLCE) trailers and provide a basis for the maintenance frequencies selected. This document is applicable to the LLCE Receiver trailer and Transport trailer assembled by Mobilized Systems Inc. (MSI). Equipment used in conjunction with, or in support of, these trailers is not included. This document does not provide the maintenance requirements for checkout and startup of the equipment following the extended lay-up status which began in the mid 1990s. These requirements will be specified in other documentation.

ESVELT, C.A.

2000-02-01T23:59:59.000Z

163

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

2001-06-01T23:59:59.000Z

164

Africa's Transport Infrastructure Mainstreaming Maintenance and  

Open Energy Info (EERE)

Africa's Transport Infrastructure Mainstreaming Maintenance and Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure Mainstreaming Maintenance and Management Agency/Company /Organization: World Bank Complexity/Ease of Use: Not Available Website: www.infrastructureafrica.org/system/files/Africa%27s%20Transport%20Inf Transport Toolkit Region(s): Africa & Middle East Related Tools The BEST Experiences with Bioethanol Buses The Sourcebook on Sustainable Urban Transport Alternative Fuels and Advanced Vehicles Data Center ... further results Find Another Tool FIND TRANSPORTATION TOOLS Transport infrastructure is a key requirement for economic growth. In Africa today, networks are sparse, conditions poor, transit slow and

165

Federal Energy Management Program: Operations and Maintenance Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance Program Structure to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Structure on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Structure on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Structure on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Structure on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Structure on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements

166

Federal Energy Management Program: Operations and Maintenance Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Operations and Maintenance Program Implementation to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Implementation on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Implementation on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Implementation on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Implementation on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Implementation on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

167

Federal Energy Management Program: Resources on Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Resources on Resources on Operations and Maintenance to someone by E-mail Share Federal Energy Management Program: Resources on Operations and Maintenance on Facebook Tweet about Federal Energy Management Program: Resources on Operations and Maintenance on Twitter Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Google Bookmark Federal Energy Management Program: Resources on Operations and Maintenance on Delicious Rank Federal Energy Management Program: Resources on Operations and Maintenance on Digg Find More places to share Federal Energy Management Program: Resources on Operations and Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning

168

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of...

169

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR...

170

FY 2014 Real Property Data Related to Operations and Maintenance...  

Office of Environmental Management (EM)

FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY 2014 Real Property Data Related to Operations and Maintenance Guidance FY2014DataRelatedtoOperatio...

171

DOE Announces Webinars on Maintenance Practices for LED Streetlights...  

Broader source: Energy.gov (indexed) [DOE]

Maintenance Practices for LED Streetlights, LED Color Stability, and More DOE Announces Webinars on Maintenance Practices for LED Streetlights, LED Color Stability, and More April...

172

Joint Maintenance Status Report of Potomac Electric Power Company...  

Broader source: Energy.gov (indexed) [DOE]

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM...

173

Operations and Maintenance for Major Equipment Types | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Types Operations and Maintenance for Major Equipment Types Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly...

174

ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the...

175

Improve Operations & Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Improve Operations & Maintenance Improve Operations & Maintenance Improve Operations & Maintenance Photo of an equipment room in a high-rise commercial office building with red and green equipment. Every building's energy consumption can benefit from rigorous operations and maintenance (O&M) practices. Properly planned and executed O&M is one of the most cost-effective strategies for ensuring equipment longevity, reliability, safety, and energy efficiency in commercial buildings. By one estimate, O&M measures cost about 20 times less and achieve roughly the same energy savings as energy efficiency upgrades. There are various opportunities to improve efficiency through O&M that can be discovered through efforts such as engaging tenants, training building staff, and

176

Modelling in industrial maintenance and reliability  

Science Journals Connector (OSTI)

......of modelling the reliability of wind turbines and some critical subsystems from...change, through the years, in wind turbines reliability. There were major...research on determining optimal maintenance policies for deteriorating systems......

Wenbin Wang

2010-10-01T23:59:59.000Z

177

Operations and Maintenance Best Practices Guide  

Broader source: Energy.gov [DOE]

The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and...

178

Operations and Maintenance for Major Equipment Types  

Broader source: Energy.gov [DOE]

Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

179

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network [OSTI]

...............................................................................................................5 5.2 Ground and Surface Water MonitoringSITE MAINTENANCE PLAN CSMRI SITE REMEDIATION June 29, 2004 Prepared by: Colorado School of Mines .................................................................................................4 5.0 SITE AIR AND WATER MONITORING

180

Operation & Maintenance for Quality Indoor Air  

E-Print Network [OSTI]

The results of numerous Indoor Air Quality (IAQ) building investigations conducted by the Georgia Tech Research Institute have shown that building Operation and Maintenance (O&M) is a very common source of IAQ problems. This paper presents...

Downing, C.; Bayer, C. W.

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Vehicle Maintenance to Vehicle Maintenance to Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Delicious Rank Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on Digg Find More places to share Alternative Fuels Data Center: Vehicle Maintenance to Conserve Fuel on AddThis.com... More in this section... Idle Reduction Parts & Equipment Maintenance Driving Behavior Fleet Rightsizing System Efficiency Vehicle Maintenance to Conserve Fuel A comprehensive vehicle maintenance strategy can help fleet managers and

182

Substations reliability-centered maintenance and predictive maintenance - a strategic partnership  

SciTech Connect (OSTI)

A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

Colsher, R.J. [Electric Power Research Institute, Eddystone, PA (United States); Abbott, P.D.; Matusheski, R.L. [EPRI & MD Center, Eddystone, PA (United States); Smith, S.B. [ERIN Engineering & Research, Walnut Creek, CA (United States)

1996-08-01T23:59:59.000Z

183

Chromatographer and the Computer—Non-Routine GC Laboratory Applications  

Science Journals Connector (OSTI)

......Sample: 0.5 ml Phillips Research Grade Ethylene split 50:50 between columns. GC Conditions...9 999.9 Table VIII. Impurities in Ethylene--Trace Analysis Using On-Line Computer...Company, Bishop, Texas, and J. G. W. Price, Celanese Chemical Company, Technical......

F. Baumann; A. C. Brown; M. B. Mitchell

1970-01-01T23:59:59.000Z

184

Neural-Network-Based Maintenance Decision Model for Diesel Engine  

Science Journals Connector (OSTI)

To decrease the fuzzy and uncertain factors in the maintenance decision models of diesel engine, a combination BP-neural-network-based maintenance decision model for diesel engine is presented in this paper. It can make the maintenance of diesel engine ... Keywords: Deterioration degree, Diesel engine, Maintenance decision, Neural network

Yingkui Gu; Juanjuan Liu; Shuyun Tang

2008-09-01T23:59:59.000Z

185

University Marketing Communications UMC Web Site Maintenance Service  

E-Print Network [OSTI]

University Marketing Communications UMC Web Site Maintenance Service Overview Content management and ongoing Web site maintenance is an essential part of any Web project plan. When developing a new Web site in Web maintenance activities. Benefits Our Web maintenance service gives you ongoing access to our group

Sibille, Etienne

186

Federal Energy Management Program: Operations and Maintenance Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Measurement to someone by E-mail Measurement to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Program Measurement on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Program Measurement on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Google Bookmark Federal Energy Management Program: Operations and Maintenance Program Measurement on Delicious Rank Federal Energy Management Program: Operations and Maintenance Program Measurement on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Program Measurement on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

187

Federal Energy Management Program: Operations and Maintenance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Support to someone by E-mail Management Support to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance Management Support on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance Management Support on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Google Bookmark Federal Energy Management Program: Operations and Maintenance Management Support on Delicious Rank Federal Energy Management Program: Operations and Maintenance Management Support on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance Management Support on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management

188

Muehrcke's Lines  

Science Journals Connector (OSTI)

Figure 1. A 46-year-old woman with metastatic sarcoma who had been treated with five cycles of doxorubicin, ifosfamide, and mesna chemotherapy presented with two symmetrical, horizontal white lines on all of her fingernails but not on her toenails. A diagnosis of ...

Morrison-Bryant M.; Gradon J.D.

2007-08-30T23:59:59.000Z

189

Beau's Lines  

Science Journals Connector (OSTI)

Figure 1. A 62-year-old woman received six cycles of docetaxel chemotherapy during a six-month period for recurrent metastatic breast cancer. She had completed treatment four weeks before this photograph was taken. Six evenly spaced, transverse lines were noted on ...

Mortimer N.J.; Mills J.

2004-10-21T23:59:59.000Z

190

Operations and Maintenance Manual | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Manual Manual Operations and Maintenance Manual October 16, 2013 - 5:00pm Addthis Closeout of the construction phase for renewable energy projects includes the creation of a comprehensive operations and maintenance (O&M) manual. Although specific content varies depending on the size, scope, and complexity of the project, the O&M manual typically includes manufacturer literature, basic operating procedures, troubleshooting techniques, measurement and verification (M&V) system documentation, and maintenance information. The general contractor should compile O&M documentation, gather as-built drawings for equipment and systems, and take the lead in organizing the manual. The commissioning agent reviews the manual to verify that it includes all necessary documentation, including:

191

POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING  

Broader source: Energy.gov (indexed) [DOE]

POST-DEACTIVATION SURVEILLANCE AND POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is

192

34 - Pipeline Commissioning, Operations, and Maintenance  

Science Journals Connector (OSTI)

Abstract The commissioning of a pipeline involves the activities after installation required to place the system into services, which activities include hydrostatic testing, cleaning and drying, and the introduction of the product to be transported into the pipeline. Pipeline operations are generally carried out by the pipeline operating company. Detailed operation and maintenance procedures specific to the pipeline should be available for use before the pipeline is commissioned and handed over to operation. Manuals for operation and maintenance should be prepared, setting out the schedules, procedures, and instructions on which activities are to be carried out, including liaison with third parties. In this chapter, the procedures of commissioning, operation, and maintenance of subsea pipeline are detailed.

Qiang Bai; Yong Bai

2014-01-01T23:59:59.000Z

193

Apply reliability centered maintenance to sealless pumps  

SciTech Connect (OSTI)

This paper reports on reliability centered maintenance (RCM) which is considered a crucial part of future reliability engineering. RCM determines the maintenance requirements of plants and equipment in their operating context. The RCM method has been applied to the management of critical sealless pumps in fire/toxic risk services, typical of the petrochemical industry. The method provides advantages from a detailed study of any critical engineering system. RCM is a team exercise and fosters team spirit in the plant environment. The maintenance strategy that evolves is based on team decisions and relies on maximizing the inherent reliability built into the equipment. RCM recommends design upgrades where this inherent reliability is being questioned. Sealless pumps of canned motor design are used as main reactor charge pumps in PVC plants. These pumps handle fresh vinyl chloride monomer (VCM), which is both carcinogenic and flammable.

Pradhan, S. (Exxon Chemicals Canada, Ontario (Canada))

1993-01-01T23:59:59.000Z

194

Guidance for UMTRA project surveillance and maintenance  

SciTech Connect (OSTI)

The Guidance for UMTRA Project Surveillance and Maintenance describes the procedures that will be used to verify that Uranium Mill Tailings Remedial Action (UMTRA) Project disposal sites continue to function as designed. The approach of this guidance document is to identify surveillance requirements and maintenance procedures that will be used to comply with NRC license requirements. This document addresses five primary activities: Definition and characterization of final site conditions. Site inspections; Ground-water monitoring; Aerial photography; and Custodial maintenance and contingency repair. Final site conditions will be defined and characterized prior to the completion of remedial actions at a site. As-built drawings will be compiled, a final topographic survey will be performed, a vicinity map will be prepared, and ground and aerial photographs will be taken. Survey monuments, site markers, and signs will be established as will a network of monitoring wells.

NONE

1986-01-01T23:59:59.000Z

195

Understanding Sustainable Transportation Choices: Shifting Routine Automobile Travel to Walking and Bicycling  

E-Print Network [OSTI]

and G.F. Ulfarsson. “Curbing Automobile Use for Sustainablebe able to shift routine automobile travel to pedestrian andChanges in Respondent Automobile Mode Shares Under Different

Schneider, Robert James

2011-01-01T23:59:59.000Z

196

POPDOSE-SR: A Routine Release Atmospheric Population Dose Model Used at SRS  

SciTech Connect (OSTI)

POPDOSE-SR is used to calculate dose to the surrounding Savannah River Site (SRS) population following routine releases of atmospheric radioactivity.

Simpkins, A.A.

2001-04-04T23:59:59.000Z

197

Steam Trap Maintenance as a Profit Center  

E-Print Network [OSTI]

the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 EXCUSES Everybody thinks his or her steam trap maintenance is good. Surveysl have shown the following are the most popular excuses encountered when managers are confronted... for steam traps. 192 ESL-IE-96-04-28 Proceedings from the Eighteenth Industrial Energy Technology Conference, Houston, TX, April 17-18, 1996 5. Set up a trap maintenance program C. Prepare and present a report to that will: management on the results...

Bouchillon, J. L.

198

BEAM LINE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BEAM LINE BEAM LINE 45 W ILHELM ROENTGEN'S INITIAL DISCOVERY of X-radiation in 1895 led immediately to practical applications in medicine. Over the next few decades X rays proved to be an invaluable tool for the investigation of the micro-world of the atom and the development of the quantum theory of matter. Almost a century later, telescopes designed to detect X-radiation are indispensable for understanding the structure and evolution of the macro-world of stars, galaxies, and the Universe as a whole. The X-Ray Universe by WALLACE H. TUCKER X-ray images of the Universe are strikingly different from the usual visible-light images. 46 SUMMER 1995 did not think: I investigated." Undeterred by NASA's rejection of a proposal to search for cosmic X-radiation, Giacconi persuaded the

199

Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Maintenance and Safety to someone by E-mail Maintenance and Safety to someone by E-mail Share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Facebook Tweet about Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Twitter Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Google Bookmark Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Delicious Rank Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on Digg Find More places to share Alternative Fuels Data Center: Natural Gas Vehicle Maintenance and Safety on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

200

Reliable Link Maintenance in Cognitive Radio Systems  

E-Print Network [OSTI]

resources and overcome the under-utilization of licensed spectrum. Since the licensed user still keeps) have to vacate the spectrum in case the licensed user claims it. In order to maintain the qualityReliable Link Maintenance in Cognitive Radio Systems Daniel Willkomm, James Gross and Adam Wolisz

Gross, James

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Reliability centered maintenance for substation equipment  

SciTech Connect (OSTI)

This paper is a collection of training materials on the principles and implementation of reliability centered maintenance. The main areas discussed in this presentation are organized as follows: RCM principles and concepts; RCM tools, resources and methods; overview of the RCM process; example RCM application; living PM program; RCM implementation experience.

NONE

1996-08-01T23:59:59.000Z

202

ICD Complex Operations and Maintenance Plan  

SciTech Connect (OSTI)

This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

Gibson, P. L.

2007-06-25T23:59:59.000Z

203

Facilities Cost Pool: Maintenance Service Responsibilities  

E-Print Network [OSTI]

C 16 EXTERIOR LANDSCAPING University Standard FM FM C 17 EXTERIOR STD BUILDING SIGNS FM FM FM FM FMD 22 DATA POINT MONITORING Environmental building standard FM FM C Cost Pool: Maintenance Service Responsibilities 2 Table of Contents 3 Building Shell

Gulliver, Robert

204

Maintenance efficace de documents XML volumineux  

E-Print Network [OSTI]

or maintain temporal XML documents, keeping track of data evolution over time. In this paper, we followMaintenance efficace de documents XML volumineux Mohamed-Amine Baazizi 1 , Nicole Bidoit 1 , Dario générer ou maintenir des documents és- tampillés garantissant un stockage efficace. Pour ce faire, nous

Boyer, Edmond

205

Project Surveillance and Maintenance Plan. [UMTRA Project  

SciTech Connect (OSTI)

The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

Not Available

1985-09-01T23:59:59.000Z

206

Resources on Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations & Maintenance » Resources on Operations & Maintenance » Resources on Operations and Maintenance Resources on Operations and Maintenance October 7, 2013 - 9:55am Addthis Many helpful resources about operations and maintenance are available. Also see Contacts. Best Practices Operations and Maintenance Best Practices Guide: Document outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website featuring events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information about ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and

207

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

208

mTOR/p70S6K signaling distinguishes routine, maintenance-level autophagy from autophagic cell death during influenza A infection  

Science Journals Connector (OSTI)

Abstract Autophagy, a stress response activated in influenza A virus infection helps the cell avoid apoptosis. However, in the absence of apoptosis infected cells undergo vastly expanded autophagy and nevertheless die in the presence of necrostatin but not of autophagy inhibitors. Combinations of inhibitors indicate that the controls of protective and lethal autophagy are different. Infection that triggers apoptosis also triggers canonical autophagy signaling exhibiting transient PI3K and mTORC1 activity. In terminal autophagy phospho-mTOR(Ser2448) is suppressed while mTORC1, PI3K and mTORC2 activities increase. mTORC1 substrate p70S6K becomes highly phosphorylated while its activity, now regulated by mTORC2, is required for LC3-II formation. Inhibition of mTORC2/p70S6K, unlike that of PI3K/mTORC1, blocks expanded autophagy in the absence of apoptosis but not moderate autophagy. Inhibitors of expanded autophagy limit virus reproduction. Thus expanded, lethal autophagy is activated by a signaling mechanism different from autophagy that helps cells survive toxic or stressful episodes.

Emmanuel Datan; Alireza Shirazian; Shawna Benjamin; Demetrius Matassov; Antonella Tinari; Walter Malorni; Richard A. Lockshin; Adolfo Garcia-Sastre; Zahra Zakeri

2014-01-01T23:59:59.000Z

209

Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Ryder Opens Natural Ryder Opens Natural Gas Vehicle Maintenance Facility to someone by E-mail Share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Facebook Tweet about Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Twitter Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Google Bookmark Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Delicious Rank Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on Digg Find More places to share Alternative Fuels Data Center: Ryder Opens Natural Gas Vehicle Maintenance Facility on AddThis.com... June 28, 2011 Ryder Opens Natural Gas Vehicle Maintenance Facility

210

SURVEILLANCE AND MAINTENANCE RBSM The Requirements Based Surveillance  

Broader source: Energy.gov (indexed) [DOE]

AND MAINTENANCE AND MAINTENANCE RBSM The Requirements Based Surveillance and Maintenance Review Process Surveillance and Maintenance Overview What is RBSM and why do I need this process? Who has used this process so far? A Summary of RBSM results across the DOE complex Viewing a sample RBSM report Performing RBSM at your facility RBSM Guidance package Surveillance and Maintenance Overview Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change.

211

Surveillance & Maintenance: The Requirements Based Surveillance and  

Broader source: Energy.gov (indexed) [DOE]

Surveillance & Maintenance: The Requirements Based Surveillance and Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Overall direction for surveillance and maintenance of excess facilities is addressed in DOE G 430.1-2, IMPLEMENTATION GUIDE FOR SURVEILLANCE AND MAINTENANCE DURING FACILITY TRANSITION AND DISPOSITION. In addition, the change in mission and operation of an excess facility should stimulate a review of surveillance and maintenance to determine what efficiencies can be gained as a result of the change. Such a review can be applied to facilities that undergoing stabilization, those intended for deactivation, and others destined for decommissioning. The material that follows provides

212

Article Published on LED Lumen Maintenance and Light Loss Factors...  

Broader source: Energy.gov (indexed) [DOE]

Article Published on LED Lumen Maintenance and Light Loss Factors Article Published on LED Lumen Maintenance and Light Loss Factors January 20, 2014 - 12:00am Addthis An article...

213

Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs  

E-Print Network [OSTI]

ENERGY CONSERVATION THRU STEAM TRAP SURVEYS AND PREVENTIVE MAINTENANCE PROGRAMS Terry Boynton, Armstrong, Three Rivers, Mich. Bob Dewhirst, Armstrong, New Braunfels, Texas. This paper will deal with steam trap surveys and preventive maintenance...

Boynton, T.; Dewhirst, B.

1980-01-01T23:59:59.000Z

214

Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

CNG Fuel System and CNG Fuel System and Cylinder Maintenance to someone by E-mail Share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Facebook Tweet about Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Twitter Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Google Bookmark Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Delicious Rank Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on Digg Find More places to share Alternative Fuels Data Center: CNG Fuel System and Cylinder Maintenance on AddThis.com... More in this section... Natural Gas Basics Benefits & Considerations Stations Vehicles Availability Conversions Emissions Maintenance & Safety

215

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov [DOE]

Guide covers version 3.0 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

216

Maintenance and Operations study for K basins sludge treatment  

SciTech Connect (OSTI)

This study evaluates maintenance and operating concepts for the chemical treatment of sludge from the 100 K Basins at Hanford. The sludge treatment equipment that will require remote operation or maintenance was identified. Then various maintenance and operating concepts used in the nuclear industry were evaluated for applicability to sludge treatment. A hot cell or cells is recommended as the best maintenance and operating concept for a sludge treatment facility.

WESTRA, A.G.

1998-11-30T23:59:59.000Z

217

Operations and Maintenance Team | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Team Team Operations and Maintenance Team October 16, 2013 - 5:00pm Addthis Assembling the right set of skills and resources to operate and maintain a renewable energy system is critical. Renewable energy technologies only perform as specified when managed by a well-trained, highly motivated operations and maintenance (O&M) team. For a renewable energy project financed through an energy savings performance contract (ESPC) or a power purchase agreement (PPA), primary O&M services are typically delivered as part of the agreement, but in-house staff will need some familiarity with the system. For agency-funded projects, O&M services may be provided by in-house facilities staff, a contracted service provider, or a combination of the two. Experienced O&M staff can provide valuable input and should be included in

218

Operations and Maintenance Training | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Training Training Operations and Maintenance Training October 16, 2013 - 5:01pm Addthis Key Actions in O&M Training Have O&M staff shadow Commissioning Agent during commissioning for early interaction with new renewable energy equipment. Train facility staff fully on O&M manual and building systems, regardless of O&M contracts on renewable energy systems. Provide key facility staff with general renewable energy and LEED training prior to building start-up. Look for opportunities for O&M staff to learn from external O&M contractors. To keep a renewable energy system performing at optimal levels, operations and maintenance (O&M) personnel must receive thorough training. A renewable energy system may be properly installed, but without a robust O&M program in place, it will not perform as specified over the long-term.

219

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

2007-02-13T23:59:59.000Z

220

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

2010-04-21T23:59:59.000Z

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Maintenance Management Program for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Cancels DOE O 433.1A. Admin Chg 1, dated 3-12-2013, cancels DOE O 433.1B.

2010-04-21T23:59:59.000Z

222

Software Maintenance and Evolution: Keith Bennett & Vaclav Rajlich  

E-Print Network [OSTI]

for change and improvements. Our aim is to describe a landscape for research in software maintenanceSoftware Maintenance and Evolution: A Roadmap Keith Bennett & Vaclav Rajlich Key Research Pointers transformation techniques. He is a founding co-Director of the Centre for Software Maintenance at Durham

223

Maintenance Approaches For ARIES-CS Power Core  

E-Print Network [OSTI]

of Fusion Energy September 14-16, 2004 Madison, WI #12;2 Outline Introduction Reactor parameters Maintenance approach based on field-period units Modular maintenance approach through selected ports Maintenance approach with ports between all the modular coils Summary and conclusion #12;3 Introduction The engineering

224

Kalispell Maintenance Headquarters Project : Environmental Assessment.  

SciTech Connect (OSTI)

The facilities needed to maintain and repair Bonneville Power Administration (BPA's) electrical equipment in northwest Montana are currently in two locations: A maintenance headquarters at the Kalispell Substation, and a temporary leased facility south of Kalispell. The present situation is not efficient. There is not enough space to accommodate the equipment needed at each site, and coordination and communication between the two sites is difficult. Also, two sites means duplication of equipment and facilities. BPA needs a single, centralized facility that would efficiently accommodate all the area's maintenance activities and equipment. BPA proposes to build a maintenance headquarters facility consisting of 2 to 4 single-story buildings totaling about 35,000 square feet (office spaces and workshop areas); an open-ended vehicle storage building (carport style); a fenced-in storage year; a storage building for flammables, herbicides, and hazardous wastes; and a parking lot. The facility would require developing about 6 to 10 acres of land. Two sites are being considered for the proposed project (see the attached map for locations). This report is the environmental assessment of the two options.

United States. Bonneville Power Administration.

1991-01-01T23:59:59.000Z

225

A Proposal for Autotuning Linear AlgebraA Proposal for Autotuning Linear Algebra Routines on Multicore PlatformsRoutines on Multicore Platforms  

E-Print Network [OSTI]

of threads the performance greatly varies Our goal: a Poly-Compilation Engine (PCE) generates differentPlatforms 33 parallelparallelumum OutlineOutline Introduction Our approach: Poly-Compilation Engine (PCE) PCB: Benchmarking Routines of the PCE Proof of concept of the PCE Conclusions #12;ICCS 2010. AmsterdamICCS 2010

Giménez, Domingo

226

A study of the effects of claim experience on Texas contractors' routine record keeping  

E-Print Network [OSTI]

with patterns of routine record keeping as affected by the independent variable of prior claim experience. The second hypothesis deals with expected value in a future claim situation of twenty six dependent variables in regard to the independent variable...

Camp, Gerald Miller

2012-06-07T23:59:59.000Z

227

Improved Tropical Cyclone Flight-Level Wind Estimates Using Routine Infrared Satellite Reconnaissance  

Science Journals Connector (OSTI)

A new and improved method to estimate the tropical cyclone flight-level winds using globally and routinely available tropical cyclone (TC) information and infrared (IR) satellite imagery is presented. The developmental data set is comprised of ...

John A. Knaff; Scott P. Longmore; Robert T. DeMaria; Debra A. Molenar

228

Evaluation of the Automated Phoenix System for Potential Routine Use in the Clinical Microbiology Laboratory  

Science Journals Connector (OSTI)

American Society for Microbiology ARTICLE BACTERIOLOGY...Routine Use in the Clinical Microbiology Laboratory J.-L...M. Perman, and G. Gilbert. 1995. The MicroScan WalkAway diagnostic microbiology system: an evaluation...

J.-L. Donay; D. Mathieu; P. Fernandes; C. Prégermain; P. Bruel; A. Wargnier; I. Casin; F. X. Weill; P. H. Lagrange; J. L. Herrmann

2004-04-01T23:59:59.000Z

229

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE | Department  

Broader source: Energy.gov (indexed) [DOE]

PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE PREVENTIVE MAINTENANCE LEADS TO EARLY DETECTION AT WIPP SITE September 1, 2011 - 12:00pm Addthis The new wire rope before installation. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. The new wire rope before installation. URS Washington TRU Solutions operations and maintenance crews demonstrate exceptional performance to replace a steel rope. Carlsbard, NM - The effectiveness of the Waste Isolation Pilot Plant's (WIPP) preventive maintenance program paid huge dividends late last month

230

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

231

Federal Energy Management Program: Operations and Maintenance for Major  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for Major Equipment Types to someone by E-mail for Major Equipment Types to someone by E-mail Share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Facebook Tweet about Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Twitter Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Google Bookmark Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Delicious Rank Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on Digg Find More places to share Federal Energy Management Program: Operations and Maintenance for Major Equipment Types on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance

232

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

Chapter 5 Types of Maintenance Programs Chapter 5 Types of Maintenance Programs � 5.1 Introduction What is maintenance and why is it performed? Past and current maintenance practices in both the private and government sectors would imply that maintenance is the actions associated with equipment repair after it is broken. The dictionary defines maintenance as follows: "the work of keeping something in proper condition; upkeep." This would imply that maintenance should be actions taken to prevent a device or component from failing or to repair normal equipment degradation experienced with the operation of the device to keep it in proper working order. Unfortunately, data obtained in many studies over the past decade indicates that most private and government facilities do not expend the necessary resources to maintain equipment in proper working

233

Steam turbine path evaluation during maintenance  

SciTech Connect (OSTI)

The deterioration of a turbine (Steam & Gas) flow path affects the efficiency of the turbine. The most critical factors which affect the efficiency of turbines are: wearing out of the trailing edges of the blades by solid particle erosion, deposits, material loss due to corrosion (also sand blast) which increases the flow area, increases in blade surface roughness, etc. Wearing out of the seals caused by shaft vibrations or rapid start-up leads to significant leakage losses. Some of these effects can be estimated with some precision during operation of the turbine, but an exact evaluation can be carried out during a maintenance applying a special fluid flow analysis program. Such a program has been developed and then adapted to achieve this goal. During maintenance the complete geometry of the steam path is measured (blades lengths, widths, angles, clearances, etc.) in the condition encountered before any corrections. Then the similar measurement is undertaken after, for example, clearance corrections, blade replacements, cleaning of the blades, etc. Using the program first of all the design data is calculated. Then the actual data is fed into the program and compared to the design data. Thus the effect of the blade surface roughness, increased seal clearances, flow area increase, solid particle damage to the trailing edge and so on for each particular stage is calculated. The effect is expressed in [kW] as a deviation from the design points. This data can be helpful during online evaluation of the turbine performance. This evaluation helps the management of the plant in undertaking the correct decision concerning the date of the next major maintenance and replacement part procurement. Many turbines in the Mexican utility have been evaluated in such a manner. Some examples are presented.

Kubiak, J.; Angel, F. del; Carnero, A.; Campos, A. [Instituto de Investigaciones Electricas, Temixo, Morelos (Mexico)] [and others

1996-07-01T23:59:59.000Z

234

TRUPACT-II Operating and Maintenance Instructions  

SciTech Connect (OSTI)

The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II) Shipping Package and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP) and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9218. In the event there is a conflict between this document and the TRUPACT-II SARP, the TRUPACT-II SARP shall govern. TRUPACT-II C of C number 9218 states, ''... each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' It further states, ''... each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the application.'' Chapter 9 of the TRUPACT-II SARP charges the Westinghouse Electric Corporation Waste Isolation Division (WID) with assuring that the TRUPACT-II is used in accordance with the requirements of the C of C. To meet this requirement and verify consistency of operations when loading and unloading the TRUPACT-II on the trailer, placing a payload in the packaging, unloading the payload from the packaging, or performing maintenance, the U.S. Department of Energy Carlsbad Area Office (U.S. DOE/CAO) finds it necessary to implement the changes that follow. This TRUPACT-II maintenance document represents a change to previous philosophy regarding site specific procedures for the use of the TRUPACT-II. This document details the instructions to be followed to consistently operate and maintain the TRUPACT-II. The intent of these instructions is to ensure that all users of the TRUPACT-II follow the same or equivalent instructions. Users may achieve this intent by any of the following methods: (1) Utilizing these instructions as is, or (2) Attaching a site-specific cover page/letter to this document stating that these are the instructions to be used at their location, or (3) Sites may prepare their own document using the steps in this document word-for-word, in-sequence, including Notes and Cautions. Site specific information may be included as deemed necessary. Submit the document to WID National TRU Programs for approval. Any revision made subsequent to WID TRU Program's approval shall be reviewed and approved by WID TRU Programs. A copy of the approval letter from WID National TRU Programs should be available for audit purposes. Users shall develop site-specific procedures addressing leak testing, preoperational activities, quality assurance, hoisting and rigging, and radiation health physics to be used in conjunction with the instructions contained in this document. Users desiring to recommend changes to this document may submit their recommendations to the WID National TRU Programs for evaluation. If approved, the change(s) will be incorporated into this document for use by all TRUPACT-II users. User sites will be audited to this document to ensure compliance within one year from the effective date of this revision. This document discusses operating instructions, required inspections and maintenance for the following: TRUPACT-II packaging, and Miscellaneous packaging, special tools, and equipment. Packaging and payload handling equipment and transport trailers have been specifically designed for use with the TRUPACT-II Packaging. This document discusses the required instructions for use of the following equipment in conjunction with the TRUPACT-II Packaging: TRUPACT-II Mobile Loading Unit (MLU), Adjustable Center-of-Gravity Lift Fixture (ACGLF), and TRUPACT-II Transport Trailer. Attachment E contains the various TRUPACT-II packaging interface control drawings, leak-test and vent-port tool drawings, ACGLF drawings, and tie-down drawings that identify the various system components.

Westinghouse Electric Corporation, Waste Isolation Division

1999-12-31T23:59:59.000Z

235

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Above-Ground Routine Transmission Line Maintenance Colorado, Wyoming, Nebraska, Montana, Utah, New Mexico, and Arizona A. Brief Description of Proposal: Western Area Power...

236

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wood Pole Inspection and T1eatment-Routine Transmission Line Maintenance Colorado, Wyoming, Nebraska, Montana, Utah, New Mexico, and Arizona A. Brief Description of Proposal:...

237

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transmission Line Hazard Tree Management Morgan County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Westem) proposes routine maintenance to remove...

238

Best Management Practice #8: Boiler and Steam Systems | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

implement a routine inspection and maintenance program to check steam traps and steam lines for leaks. Repair leaks and replace faulty steam traps as soon as possible. Develop...

239

CX-011235: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

35: Categorical Exclusion Determination CX-011235: Categorical Exclusion Determination Wood Pole Inspection and Treatment - Routine Transmission Line Maintenance CX(s) Applied:...

240

Monitoring systems for predictive maintenance of steam turbines  

SciTech Connect (OSTI)

This paper describes two PC based computer systems that have been developed, constructed and installed in a power plant for predictive maintenance. The first system, called SIMPER, is operating on-line, collecting operational parameters such as: vibration, rotor thermal stresses, efficiency, pressures, temperatures and water level in the boiler drum from four 300 MW units. SIMPER is embedded in a network of eight nodes under the QNX operating system, and the data acquisition system has sixty four input channels. SICAD, the second system, is a dedicated computerized vibration acquisition and analysis system. The system is embedded in a 386 personal computer, and has eight input channels; each channel has its own programmable digital tracking filter. SICAD can record the vibration waveform, and the synchronous or subsynchronous vectors; the graphic interface displays in real time the polar diagram, the spectrum and waveform of the vibration signature that is being collected. SICAD can be used for balancing a multi rotor system applying the modal balancing concept.

Santiago, A.A.; Poujol-Galvan, F.C.; Kubiak, J.A.; Rivera-Grijalva, J.J.; Lopez, P.J. [Inst. de Investigaciones Electricas, Cuernavaca (Mexico)

1994-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility  

Broader source: Energy.gov (indexed) [DOE]

MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division MAINTENANCE Assessment Plan, NNSA/Nevada Site Office Facility Representative Division An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance .Employees shall be encouraged to become involved in the identification and control of hazards in the workplace. (DOE O 440.1A CRD) Workers shall have the right, without reprisal, to accompany DOE worker

242

Annual summary report on surveillance and maintenance activities of the surplus contaminated facilities program at Oak Ridge National Laboratory for period ending September 30, 1991  

SciTech Connect (OSTI)

The Surplus Contaminated Facilities Program (SCFP) was established at the Oak Ridge National Laboratory (ORNL) in 1985 to provide support for inactive contaminated facilities that were largely abandoned by the programs which they formerly served. This support provides for routine surveillance and maintenance (S M) and special projects beyond a routine nature when such actions are needed to ensure adequate protection of personnel or the environment. The facilities included in the program had been used for research, technology development, isotope production and processing, and waste management. Support for facilities in the SCFP has previously been provided by the Department of Energy's (DOE's) Office of Energy Research: Multiprogram Energy Laboratories -- Facilities Support (ERKG) because of multiprogram use of the facilities or because of the landlord responsibility of Energy Research. Recently, an integrated Decontamination and Decommissioning (D D) program within the DOE Office of Environmental Restoration and Waste Management has been established to collectively manage the former Surplus Facilities Management Program, Defense D D Program, and the KG-funded, ORNL-originated SCFP. This report gives an overview of the S M planning, routine S M, and special maintenance project activities which have occurred at the SCFP facilities during the 1991 Fiscal Year.

Cannon, T.R.; Ford, M.K.; Holder, L. Jr.

1991-09-01T23:59:59.000Z

243

Sensor, method and system of monitoring transmission lines  

SciTech Connect (OSTI)

An apparatus, method, and system for measuring the magnetic field produced by phase conductors in multi-phase power lines. The magnetic field measurements are used to determine the current load on the conductors. The magnetic fields are sensed by coils placed sufficiently proximate the lines to measure the voltage induced in the coils by the field without touching the lines. The x and y components of the magnetic fields are used to calculate the conductor sag, and then the sag data, along with the field strength data, can be used to calculate the current load on the line and the phase of the current. The sag calculations of this invention are independent of line voltage and line current measurements. The system applies a computerized fitter routine to measured and sampled voltages on the coils to accurately determine the values of parameters associated with the overhead phase conductors.

Syracuse, Steven J.; Clark, Roy; Halverson, Peter G.; Tesche, Frederick M.; Barlow, Charles V.

2012-10-02T23:59:59.000Z

244

Technical information report: Plasma melter operation, reliability, and maintenance analysis  

SciTech Connect (OSTI)

This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

Hendrickson, D.W. [ed.

1995-03-14T23:59:59.000Z

245

Optimal forest management for carbon sequestration and biodiversity maintenance.  

E-Print Network [OSTI]

??Managing planted forests for carbon sequestration and biodiversity maintenance has become increasingly important in times of rapid climate change and the loss of biodiversity worldwide.… (more)

Nghiem, Thi Hong Nhung

2011-01-01T23:59:59.000Z

246

13 - Maintenance and repair of gas turbine components  

Science Journals Connector (OSTI)

Abstract: Material selection is a key factor in gas turbine performance and lifecycle cost because it has a central influence in the maintenance of the gas turbine.1 Further, the operation of a gas turbine does result in gas path degradation2 that impacts lifecycle costs and eventually design, manufacture, material choice and maintenance.3 A component repair programme that minimizes maintenance costs and maximizes equipment availability can be instituted to meet or improve lifecycle cost. This chapter presents the key factors influencing the need for maintenance and the choices available.

T. Álvarez Tejedor; R. Singh; P. Pilidis

2013-01-01T23:59:59.000Z

247

Los Alamos Site Office Nuclear Maintenance Management Program...  

Office of Environmental Management (EM)

and Emergency Management Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 1114...

248

Overview of the Second Quarter 2011 Surveillance and Maintenance...  

Office of Legacy Management (LM)

Maintenance and optimization of pilot air stripper No freezing observed Reduced solar availability reduced power available, causing pump to stop Resolved power issues...

249

Y-12 demos former utilities and maintenance facility | National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

demos former utilities and maintenance facility | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing...

250

ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE  

SciTech Connect (OSTI)

The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

Trapp, D.

2014-08-25T23:59:59.000Z

251

EA-0962: Construction and Routine Operation of a 12-kilovolt Overhead  

Broader source: Energy.gov (indexed) [DOE]

62: Construction and Routine Operation of a 12-kilovolt 62: Construction and Routine Operation of a 12-kilovolt Overhead Powerline and Formal Authorization for a 10-inch and 8-inch Fresh Water Pipeline Right-of-Way at Naval Petroleum Reserve No. 1, Kern County, California EA-0962: Construction and Routine Operation of a 12-kilovolt Overhead Powerline and Formal Authorization for a 10-inch and 8-inch Fresh Water Pipeline Right-of-Way at Naval Petroleum Reserve No. 1, Kern County, California SUMMARY This EA evaluates the environmental impacts of the proposal to install an overhead powerline extension from the U.S. Department of Energy's Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, which will significantly reduce NPR-1's overall utility costs. NPR-1 is known as Elk Hills oil field and is located in the southern San Joaquin Valley,

252

Surveillance Guide - OPS 9.2 Shift Routines and Operating Practices  

Broader source: Energy.gov (indexed) [DOE]

SHIFT ROUTINES AND OPERATING PRACTICES SHIFT ROUTINES AND OPERATING PRACTICES Objective The objective of this surveillance is to verify that standards for the professional conduct of operations personnel are established and followed so that operator performance meets the expectations of DOE and facility management. This surveillance provides a basis for evaluating watchstanding practices of operations personnel external to the control area in various plant locations. 2.0 References 2.1 DOE 5480.19, Conduct of Operations Requirements for DOE Facilities 2.2 DOE-STD-1041-93, Guide to Good Practices for Shift Routines and Operating Practices 3.0 Requirements Implemented This surveillance is conducted to implement requirements of the Functions, Responsibilities and Authorities Manual, Section 20,

253

Parallel Lines II: Construction of Parallel Lines  

Science Journals Connector (OSTI)

Situations are frequently encountered in which two lines, determined by linear regression, are theoretically...m 1 and m 2.

Ronald J. Tallarida Ph. D.; Rodney B. Murray Ph. D.

1987-01-01T23:59:59.000Z

254

Pacific Northwest National Laboratory Grounds Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Pacific Pacific Northwest National Laboratory (PNNL) operates an award-winning grounds maintenance program that comprises a comprehensive landscape and irrigation management program. The program has helped the laboratory reduce its water use for irrigation by 30%. PNNL is located in Richland, Washington, and is managed and operated by Battelle for the U.S. Department of Energy (DOE). PNNL scientists and engineers perform research on a variety of subjects, including energy and national security. PNNL has more than 4,200 staff members, sits on 600 acres, and houses 2 million square feet of facilities. The laboratory is located in an arid region of the state, receiving only eight inches of precipitation annually. It has more than 100 acres of turf and landscaped areas and

255

Natural Gas Pipe Line Companies (Connecticut) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Pipe Line Companies (Connecticut) Pipe Line Companies (Connecticut) Natural Gas Pipe Line Companies (Connecticut) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Connecticut Program Type Siting and Permitting Provider Public Utilities Regulatory Authority These regulations list standards and considerations for the design, construction, compression, metering, operation, and maintenance of natural gas pipelines, along with procedures for records, complaints, and service

256

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan  

SciTech Connect (OSTI)

This document is the third revision of the 'Monitoring Well Inspection and Maintenance Plan' for groundwater wells associated with the US Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: (1) inspecting the physical condition of monitoring wells at Y-12; (2) identifying maintenance needs that extend the life of the well and assure well-head protection is in place, and (3) identifying wells that no longer meet acceptable monitoring-well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, 'proactive stewardship of the extensive monitoring well network at Y-12' (BWXT 2004a). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality monitoring and hydrologic data are able to be obtained from the well network. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (BWXT 2006b), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data. This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime); (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime); and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of the Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV east of scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bound to the west by a surface drainage feature (Dunaway Branch) and by Scarboro Road to the east. The GWPP maintains an extensive database of construction details and related information for the monitoring wells in each hydrogeologic regime in the 'Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and parts of Bethel Valley on the US DOE Oak Ridge Reservation (BWXT 2003a). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (BWXT 2004a).

None

2006-12-01T23:59:59.000Z

257

Modeling Web Maintenance Centers Through Queue Models M. Di Penta  

E-Print Network [OSTI]

Modeling Web Maintenance Centers Through Queue Models M. Di Penta , G. Casazza ¡ , G. Antoniol´eal Abstract The Internet and WEB pervasiveness are changing the landscape of several different areas ranging from infor- mation gathering/managing and commerce to software development, maintenance and evolution

Di Penta, Massimiliano

258

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1  

E-Print Network [OSTI]

Printing Your Monthly PTA Maintenance Screen Shannon Monahan Page 1 Office of Postdoctoral Maintenance Screen. All starting points begin before the popup menu comes up. In Internet Explorer the Orientation to Landscape, and click OK. Print as needed to either your printer or to Adobe PDF (only works

Kay, Mark A.

259

Risk-based Multiobjective Optimization Model for Bridge Maintenance Planning  

SciTech Connect (OSTI)

Determining the optimal maintenance plan is essential for successful bridge management. The optimization objectives are defined in the forms of minimizing life-cycle cost and maximizing performance indicators. Previous bridge maintenance models assumed the process of bridge deterioration and the estimate of maintenance cost are deterministic, i.e., known with certainty. This assumption, however, is invalid especially with estimates over a long time horizon of bridge life. In this study, we consider the risks associated with bridge deterioration and maintenance cost in determining the optimal maintenance plan. The decisions variables include the strategic choice of essential maintenance (such as silane treatment and cathodic protection), and the intervals between periodic maintenance. A epsilon-constrained Particle Swarm Optimization algorithm is used to approximate the tradeoff between life-cycle cost and performance indicators. During stochastic search for optimal solutions, Monte-Carlo simulation is used to evaluate the impact of risks on the objective values, at an acceptance level of reliability. The proposed model can facilitate decision makers to select the compromised maintenance plan with a group of alternative choices, each of which leads to a different level of performance and life-cycle cost. A numerical example is used to illustrate the proposed model.

Yang, I-T. [Associate Professor, National Taiwan University of Science and Technology (China); Hsu, Y.-S.

2010-05-21T23:59:59.000Z

260

Reliability centered maintenance (RCM) for substations project overview  

SciTech Connect (OSTI)

An EPRI Tailored Collaboration project establishing guidelines and tools for implementing Reliability Centered Maintenance (RCM) in substations is nearing completion and final results are being presented at this Substation RCM Conference. The ultimate goal of this RCM project is to help utilities slash substation operations and maintenance costs by optimizing equipment maintenance intervals. Preventive maintenance (PM) programs typically have been developed on a component-by-component basis, relying heavily on equipment vendors` maintenance recommendations. RCM is a logical alternative to traditional PM programs. It is intelligent, common sense maintenance that is function-based rather than component-based. First developed by the airline industry in the 1960s and further developed and applied to the nuclear industry by EPRI in the 1980s, RCM ranks the importance of each function of a system, calculates the impact the loss of the function would have on the overall system, and drives the design of appropriate maintenance tasks for each function. The nuclear industry reaped savings of at least 25% by adopting RCM, and one utility that tried this approach for substation maintenance reported savings of 13% in one year.

Lyons, P.F.

1996-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

`ODDS ALGORITHM'-BASED OPPORTUNISTIC MAINTENANCE FOR PRESERVING COMPONENT PERFORMANCES  

E-Print Network [OSTI]

into account a `lifecycle management'-oriented approach (Takata, et al., 2004). Indeed, limits on resources, at the manufacturing stage, an innovative culture wherein maintenance activities become of equal importance to actual planning and the production strategy planning to develop opportunistic maintenance tasks guaranteeing

Boyer, Edmond

262

Heavy Machine Failure Maintenance Stratege Study Based on FMEA  

Science Journals Connector (OSTI)

Heavy machine is mainly used for large-scale, large parts of the processing, is the country's headed guard equipment. Heavy machine's non-normal shutdown will result in significant damage to the enterprise, how to effectively improve the maintenance ... Keywords: Heavy machine, FMEA, Maintenance Strategy

Deng Chao; Xiong Yao; Yuan-hang Wang; Wu Jun

2010-06-01T23:59:59.000Z

263

Reliability-Based Prioritizing Maintenance Policy for Distribution System  

Science Journals Connector (OSTI)

This paper presents an approach to prioritize maintenance tasks in power distribution system based on reliability models. This approach define weighted average system reliability index WASRI employing reliability indices SAIFI, SAIDI, MAIFI and interruption ... Keywords: Maintenance management, distribution reliability, reliability indices

Zhang Yong; Sun Xiaorong; Chen Hao; Fangxing Li

2010-06-01T23:59:59.000Z

264

Utility of multispectral imaging for nuclear classification of routine clinical histopathology imagery  

E-Print Network [OSTI]

Utility of multispectral imaging for nuclear classification of routine clinical histopathology minimal additional spectral information for a pixel-level nuclear classification task than would standard presented in [17]. Results and Discussion Classification using all image bands We split our dataset

California at Santa Barbara, University of

265

Routine as Resource for the Design of Learning Systems Scott Davidoff  

E-Print Network [OSTI]

-Chair Carnegie Mellon Scott E. Hudson Carnegie Mellon Gregory D. Abowd Georgia Institute of Technology SubmittedRoutine as Resource for the Design of Learning Systems Scott Davidoff May 2011 CMU-HCII-11 in partial fulfillment of the requirements for the Degree of Doctor of Philosophy Copyright © 2011 Scott

266

Dental radiology dosimetric data as routinely collected in an Italian hospital  

Science Journals Connector (OSTI)

......as routinely collected in an Italian hospital J. Fogli 1 2 * C. Carpentieri 1 2 A...radiology data was collected in an Italian hospital. Following the Italian quality assurance...Medical Physics Department of Livorno Hospital (Italy), considered as a sample of......

J. Fogli; C. Carpentieri; A. Del Guerra; M. E. Fantacci; A. Marchi; V. Marzulli; A. Tofani

2008-01-01T23:59:59.000Z

267

Technology Management Routines That Matter to Technology Managers Daniel Z. Levin  

E-Print Network [OSTI]

Technology Management Routines That Matter to Technology Managers Daniel Z. Levin Management South Africa barnardh@gibs.co.za International Journal of Technology Management, Vol. 41, Nos. 1/2, 2008, pp. 22-37 ABSTRACT This study addresses the fragmentation in the technology management field

Lin, Xiaodong

268

Photoemission currentspacecraft voltage relation: Key to routine, quantitative low-energy plasma measurements  

E-Print Network [OSTI]

Photoemission current�spacecraft voltage relation: Key to routine, quantitative low-energy plasma measurements J. D. Scudder and Xuejun Cao Department of Physics and Astronomy, University of Iowa, Iowa City F/C. The photoemission current function is found to be time independent using nearly 10 months of GGS-Polar data from

California at Berkeley, University of

269

Operations and Maintenance Program Structure | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Program Structure Operations and Maintenance Program Structure Operations and Maintenance Program Structure October 4, 2013 - 5:12pm Addthis The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and administration. This approach is commonly referred to as the OMETA principle. Common roles and responsibilities for each function within the OMETA principle are outlined below. Operations The operations function of the O&M program covers the following responsibilities: Administration: Responsible for ensuring effective implementation and control of O&M activities Conduct of Operations: Responsible for ensuring efficient, safe, and reliable process operations across the O&M program

270

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

1.1 1.1 Chapter 11 Ten Steps to Operational Efficiency Step 1: Strive to increase management awareness and appreciation of the operations and maintenance program/department. * Consider developing a maintenance mission statement and requesting/requiring management sign-off. * Consider developing a maintenance plan and requesting/requiring management sign-off. * Begin the development of the OMETA linkages. - Develop key points of contact within other departments that can participate in the O&M mission. Step 2: Commit to begin tracking Operations and Maintenance activities. * Need to understand where O&M time is spent. * Need to understand where O&M dollars are spent. * Consider (strongly) purchasing or enhancing a Computerized Maintenance Management

271

Operations and Maintenance Best Practices Guide | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide October 7, 2013 - 9:56am Addthis The Federal Energy Management Program's Operations and Maintenance (O&M) Best Practices Guide outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Following these best practices can help agencies gain management buy-in for O&M programs and save an estimated 5% to 20% on energy bills without a significant capital investment. Depending on the facility, these savings can represent thousands to hundreds-of-thousands of dollars each year. Read the Operations and Maintenance (O&M) Best Practices Guide: Release 3.0. See individual chapters: Front Matter

272

Protocol, Development and Maintenance of Criteria and Review Approach  

Broader source: Energy.gov (indexed) [DOE]

Development and Maintenance of Criteria and Review Development and Maintenance of Criteria and Review Approach Documents - July 2013 Protocol, Development and Maintenance of Criteria and Review Approach Documents - July 2013 July 2013 Protocol for the Development and Maintenance of Criteria and Review Approach Documents The purpose of this protocol is to establish the requirements and responsibilities for the development and maintenance of Criteria and Review Approach Documents (CRADs) used by the Office of Safety and Emergency Management Evaluations (HS-45). The HS-45 CRADS are carefully selected, modified (if required), and referenced in HS-45 appraisal plans. These plans are used to provide an outline of the activities planned to assess the effectiveness of safety and emergency management processes and

273

Optimum maintenance strategy under uncertainty in the lifetime distribution  

Science Journals Connector (OSTI)

Abstract The problem of determining the optimal maintenance strategy for a machine given its lifetime distribution has been studied extensively. Solutions to this problem are outlined in the academic literature, prescribed in professional handbooks, implemented in reliability engineering software systems and widely used in practice. These solutions typically assume that the lifetime distribution and its parameter values are known with certainty, although this is usually not the case in practice. In this paper we study the effect of parameter uncertainty on the optimum age-based maintenance strategy. The effect of uncertainty is evaluated by considering both a theoretical uniform lifetime distribution and a more realistic Weibull lifetime distribution. The results show that admitting to the uncertainty does influence the optimal maintenance age and also provides a quantifiable cost benefit. The results can help maintenance managers in making maintenance decisions under uncertainty, and also in deciding when it is worthwhile to invest in advanced data improvement procedures.

Bram de Jonge; Warse Klingenberg; Ruud Teunter; Tiedo Tinga

2015-01-01T23:59:59.000Z

274

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

275

The design and implementation of the parallel out-of-core ScaLAPACK LU, QR and Cholesky factorization routines  

SciTech Connect (OSTI)

This paper describes the design and implementation of three core factorization routines--LU, QR and Cholesky--included in the out-of-core extension of ScaLAPACK. These routines allow the factorization and solution of a dense system that is too large to fit entirely in physical memory. An image of the full matrix is maintained on disk and the factorization routines transfer sub-matrices into memory. The left-looking column-oriented variant of the factorization algorithm is implemented to reduce the disk I/O traffic. The routines are implemented using a portable I/O interface and utilize high performance ScaLAPACK factorization routines as in-core computational kernels. The authors present the details of the implementation for the out-of-core ScaLAPACK factorization routines, as well as performance and scalability results on the Intel Paragon.

D`Azevedo, E.F.; Dongarra, J.J.

1997-04-01T23:59:59.000Z

276

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

277

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

routine road maintenance on its existing access roads along the Kayenta-Navajo 230-kV Transmission Line. The approximate 31.7 miles of road maintenance would occur...

278

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field  

E-Print Network [OSTI]

Uncertainties in Achieving Energy Savings from HVAC Maintenance Measures in the Field Kristin utilities across the nation to include HVAC maintenance measures in energy efficiency programs Maintenance measures have a significant potential for energy savings in residential and commercial unitary

California at Davis, University of

279

Maintenance Guide for DOE Low-Level Waste Disposal Facility  

Broader source: Energy.gov (indexed) [DOE]

4 4 G Approved: XX-XX-XX IMPLEMENTATION GUIDE for use with DOE M 435.1-1 Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses U.S. DEPARTMENT OF ENERGY DOE G 435.1-4 i (and ii) DRAFT XX-XX-XX LLW Maintenance Guide Revision 0, XX-XX-XX Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses CONTENTS 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.2 Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.3 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.3.1 Objectives . . . . . . . . . . . . . . . . . . . . . . . . .

280

E-Print Network 3.0 - alternative telomere maintenance Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: plays a role in telomere maintenance. To investigate the possibility that ORC bound to telo- mere... to varying extents in cells with different telomere-maintenance...

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

How to Determine and Verify Operating and Maintenance (O&M) Savings...  

Broader source: Energy.gov (indexed) [DOE]

and Maintenance in Federal Energy Savings Performance Contracts Operations & Maintenance Best Practices Guide: Chapter 3 DRAFT Measurement & Verification Guidelines Version 4.0...

282

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Final July 01, 2010 Final July 01, 2010 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2010 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

283

Training on PV Systems: Design, Construction, Operation and Maintenance |  

Open Energy Info (EERE)

Training on PV Systems: Design, Construction, Operation and Maintenance Training on PV Systems: Design, Construction, Operation and Maintenance Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Training on PV Systems: Design, Construction, Operation and Maintenance Agency/Company /Organization: Leonardo Energy Sector: Energy Focus Area: Renewable Energy, Solar Website: www.leonardo-energy.org/node/5948 Training on PV Systems: Design, Construction, Operation and Maintenance Screenshot References: PV Training [1] Overview "A free series of six webinars will be delivered to provide the required knowledge to design a high performance photovoltaic (PV) installation, entering into economic evaluation and project cash-flow. Additionally, very practical aspects such as the construction, start-up, quality management and testing will be reviewed. Plant operation is described in detail, with

284

Simple Maintenance Saves Costly Furnace Repair/Replacement | Department of  

Broader source: Energy.gov (indexed) [DOE]

Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement Simple Maintenance Saves Costly Furnace Repair/Replacement January 6, 2010 - 8:26am Addthis Chris Stewart Senior Communicator at DOE's National Renewable Energy Laboratory For the past few weeks, my forced-air gas furnace has been on the fritz. I blame this on the fact that I haven't been as diligent as I should have been with regular furnace maintenance, which includes: Checking the condition of the vent connection pipe and chimney Checking the physical integrity of the heat exchanger Adjusting the controls to provide optimum water and air temperature settings for both efficiency and comfort Having a technician perform a combustion-efficiency test Checking the combustion chamber for cracks. Testing for carbon monoxide

285

Federal Energy Management Program: Resources on Operations and Maintenance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations and Maintenance Operations and Maintenance Graphic of the eTraining logo Training Available Advanced Electric Metering in Federal Facilities: Learn how to take full advantage of advanced electric metering systems by taking this FEMP eTraining course. Many helpful resources about operations and maintenance are available. Best Practices Operations and Maintenance Best Practices Guide: Outlines best practices to help Federal agencies implement effective O&M for systems and equipment found at their facilities. Federal Facilities Council: Website features events, reports, and links to National Academy websites. Commissioning Commissioning for Federal Facilities: Comprehensive information on ongoing commissioning processes to resolve operating problems, improve comfort, optimize energy use, and identify retrofits for commercial and institutional buildings and central plant facilities.

286

Job Maintenance and Capital Development Fund (North Carolina) | Department  

Broader source: Energy.gov (indexed) [DOE]

Maintenance and Capital Development Fund (North Carolina) Maintenance and Capital Development Fund (North Carolina) Job Maintenance and Capital Development Fund (North Carolina) < Back Eligibility Commercial Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State North Carolina Program Type Grant Program Provider Department of Commerce The Job Maintenance and Capital Development Fund provides annual grants to businesses which are located in Development Tier I counties. The Fund is intended to encourage the retention of significant numbers of high-paying, high-quality job and large-scale capital investments. Grants may be made for a term of up to ten years. The business must have at least 2000 employees and invest $200 million in capital improvements

287

Post-Deactivation Surveillance and Maintenance Planning | Department of  

Broader source: Energy.gov (indexed) [DOE]

Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is deciding which spaces must be accessed and which equipment must be operated. This should be agreed upon with the organization that will receive the facility for subsequent S&M and, where needed to meet a stakeholder, regulatory, and tribal nations commitment.

288

Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance  

Broader source: Energy.gov (indexed) [DOE]

Draft July 9, 2009 Draft July 9, 2009 1 Attachment Implementation Procedures to Report Deferred, Actual, and Required Maintenance On Real Property 1. The following is the FY 2009 implementation procedures for the field offices/sites to determine and report deferred maintenance on real property as required by the Statement of Federal Financial Accounting Standards (SFFAS) No. 6, Accounting for Property, Plant, and Equipment (PP&E) and DOE Order 430.1B, Real Property Asset Management (RPAM). a. This document is intended to assist field offices/sites in consistently and accurately applying the appropriate methods to determine and report deferred maintenance estimates and reporting of annual required and actual maintenance costs. b. This reporting satisfies the Department's obligation to recognize and record deferred

289

Federal Requirements for Operations and Maintenance | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations & Maintenance » Federal Requirements Operations & Maintenance » Federal Requirements for Operations and Maintenance Federal Requirements for Operations and Maintenance October 4, 2013 - 5:09pm Addthis The following laws and regulations set advanced metering and measurement requirements for Federal agencies. Energy Policy Act (EPAct) of 2005: Requires all Federal buildings to be metered by October 1, 2012, to ensure efficient energy use and reduce the cost of electricity used in Federal facilities. Advanced meters or metering devices must provide data at least daily and measure the consumption of electricity at least hourly. These devices must be used to the maximum extent practical. Requires Federal agencies to submit to the U.S. Department of Energy (DOE) an implementation plan identifying personnel responsible for achieving

290

Method and computer program product for maintenance and modernization backlogging  

DOE Patents [OSTI]

According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

2013-02-19T23:59:59.000Z

291

Multi-canister overpack operations and maintenance manual  

SciTech Connect (OSTI)

This manual provides general operating and maintenance instructions for the Multi-Canister Overpack. Procedure outlines included are conceptual in nature and will be modified, expanded, and refined during preparation of detailed operating procedures.

PIERCE, S.R.

1999-06-23T23:59:59.000Z

292

Maintenance features of the Compact Ignition Tokamak fusion reactor  

SciTech Connect (OSTI)

The Compact Ignition Tokamak (CIT) is envisaged to be the next experimental machine in the US Fusion Program. Its use of deuterium/tritium fuel requires the implementation of remote handling technology for maintenance and disassembly operations. The reactor is surrounded by a close-proximity nuclear shield which is designed to permit personnel access within the test cell, one day after shutdown. With the shield in place, certain maintenance activities in the cell may be done hands-on. Maintenance on the reactor is accomplished remotely using a boom-mounted manipulator after disassembling the shield. Maintenance within the plasma chamber is accomplished with two articulated boom manipulators that are capable of operating in a vacuum environment. They are stored in a vacuum enclosure behind movable shield plugs.

Spampinato, P.T.; Hager, E.R.

1987-01-01T23:59:59.000Z

293

Assessment of Bridge Inspection and Maintenance in the United States  

E-Print Network [OSTI]

Bridge inspection and maintenance is extremely important to the country since it is the economic lifeblood of the United States business and people relying upon them to do business and get to work. Although bridge disasters are relatively rare...

Kwok, Kin Yip George

2009-01-01T23:59:59.000Z

294

Pre-conceptual Design Assessment of DEMO Remote Maintenance  

E-Print Network [OSTI]

EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally ...

Loving, A; Sykes, N; Iglesias, D; Coleman, M; Thomas, J; Harman, J; Fischer, U; Sanz, J; Siuko, M; Mittwollen, M; others,

2013-01-01T23:59:59.000Z

295

Long-Term Surveillance Operations and Maintenance Fiscal Year...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011-2020...

296

National Geothermal Data System Architecture Design, Testing and Maintenance  

Broader source: Energy.gov [DOE]

Project objective: To create the National Geothermal Data System (NGDS) comprised of a core and distributed network of databases and data sites that will comprise a federated system for acquisition, management, maintenance, and dissemination of geothermal and related data.

297

Chapter 18 - Pipeline Vibration and Condition Based Maintenance  

Science Journals Connector (OSTI)

This chapter comprises two integrated parts. The first part of the chapter devotes to a detailed discussion of the mechanism leading to pipeline vibration and the effect of internal and external fluid flow on the pipeline vibration. It summarizes the formulations used for the design of optimal free span length of pipeline segments under different boundary conditions and pipeline operating conditions. Different measures used to mitigate pipeline vibration are also briefly discussed in the section. The procedures of pipeline condition based maintenance (CBM) are discussed in the second part of the chapter using vibration and other corrective maintenance (CM) parameters as asset health indicators. The typical models including P–F curve model, proportional hazard model, and proportional covariate model used to determine the optimal threshold and inspection intervals in CBM are introduced and discussed. The chapter also discusses the optimization of long-term maintenance activities using reliability based preventive maintenance decision-making approach.

Boyun Guo; Shanhong Song; Ali Ghalambor; Tian Ran Lin

2014-01-01T23:59:59.000Z

298

An approach to measuring the quality of maintenance performance  

Science Journals Connector (OSTI)

......finished product. Thus, it involves some capital investment with expected turnover on...maintenance profitability if the total expenditure remains approx- imately constant is...assets: theoretical architecture and capital value theory in perspective. Ph.D......

S. A. Oke; M. K. O. Ayomoh; I. O. Oyedokun

2007-01-01T23:59:59.000Z

299

Maintenance Guide for DOE Low-Level Waste Disposal Facility ...  

Office of Environmental Management (EM)

Guide for DOE Low-Level Waste Disposal Facility Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses...

300

Maintenance and Operations of Schools for Energy Efficiency  

E-Print Network [OSTI]

in more than 100 Texas public school districts. The most commonly observed problems in maintaining and operating public schools for energy efficiency are presented along with successful basic methods of inspecting schools for energy efficient maintenance...

McClure, J. D.; Estes, J. M.

1986-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

An integrated cost model for production scheduling and perfect maintenance  

Science Journals Connector (OSTI)

Production scheduling deals with scheduling production jobs on a machine (single or multiple) in order to optimise a specific objective such as total weighted completion times or total weighted tardiness. The assumption that machines are always available for processing jobs is generally used in the production scheduling literature. In reality, machines often are unavailable due to preventive maintenance activities or machine failure. Production scheduling and preventive maintenance planning are interrelated, but are most often treated separately. This interdependency seems to be overlooked in the literature. This work integrates, simultaneously, the decisions of preventive maintenance and job order sequencing for a single machine. The objective is to find the job order sequence and maintenance decisions that would minimise the expected cost.

Laith A. Hadidi; Umar M. Al-Turki; M. Abdur Rahim

2011-01-01T23:59:59.000Z

302

An approach to measuring the quality of maintenance performance  

Science Journals Connector (OSTI)

......Transportation cost. NbM = Cost of salaries. Ny = Price of selling...finished product. ai = Initial cost of production associated to department i. di...maintenance performance in oil and gas production assets: theoretical architecture......

S. A. Oke; M. K. O. Ayomoh; I. O. Oyedokun

2007-01-01T23:59:59.000Z

303

Suggested improvements to solar system maintenance based on field experience  

SciTech Connect (OSTI)

Field experience has shown that maintenance is a critical factor in determining the overall success of a solar system. This paper summarizes the field experience with the maintenance of over 30 solar installations, three of which contain more than 500 individual solar systems for residential housing. The field results show several severe problems, and an analysis indicates that a number of improvements can be made to help avoid them. These include (1) improving solar designs, (2) producing service documents, and (3) providing training for maintenance personnel. Specific technical improvements to solar designs are presented in this paper, the number and content of service documents are outlined, and suggestions for training of maintenance personnel are presented.

Johnson, D.L.; Hittle, D.C.; Joncich, D.M.

1983-06-01T23:59:59.000Z

304

Enhancing Building Performance Through More Responsive Maintenance System  

E-Print Network [OSTI]

Electric Company (SCECO) are modeled in Extend+BPR® to be an experimental tool for evaluating the benefits of multi-skilled technicians. The simulation models of this study showed significant improvement in both preventive and corrective maintenance...

Alsudairi, A. A.

2012-01-01T23:59:59.000Z

305

Operations and Maintenance Program Measurement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement Operations and Maintenance Program Measurement October 4, 2013 - 5:19pm Addthis Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a successful O&M program. O&M managers must think beyond reliability. Successful programs incorporate reliability along with controlling costs, evaluating and implementing new technologies, tracking and reporting health and safety issues, and more. Not only are these metrics useful in assessing effectiveness, but also in equipment cost justification, program modifications, and staff hiring. Common Metrics The following metrics are common in evaluating effective O&M programs. Not

306

Post-Deactivation Surveillance and Maintenance Planning | Department of  

Broader source: Energy.gov (indexed) [DOE]

Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning Post-Deactivation Surveillance and Maintenance Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is deciding which spaces must be accessed and which equipment must be operated. This should be agreed upon with the organization that will receive the facility for subsequent S&M and, where needed to meet a stakeholder, regulatory, and tribal nations commitment.

307

Requirements-Based Surveillance and Maintenance Review Guide | Department  

Broader source: Energy.gov (indexed) [DOE]

Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to provide organizations with the knowledge and tools necessary to perform a disciplined and thorough Requirements-Based Surveillance and Maintenance (RBSM) review at any given facility or site in order to cost effectively manage S&M activities. Sections 1.0, 2.0 and 3.0 of this manual provide a brief explanation of what the RBSM review process is, why such a process is needed and the steps a facility or site should take to get organized and initiate an RBSM review. Sections 4.0 and 5.0 of this manual discuss the use of the data gained from the RBSM review process like the development of cost reduction strategies and the development of

308

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley  

E-Print Network [OSTI]

?unintentional?vandalism,?and?normal?irrigation?district?operational?and?maintenance? activities.??Each?project?was?evaluated?using?a?visual?inspection?process?during?which? performance/condition?ratings?were?assigned.? ? Without?question,?the?best?lining?system?is?a?synthetic?liner?with?a?protective?barrier?of? shotcrete.??The?synthetic?liner?significantly?reduces?seepage,?while?the?shotcrete?protects...?it? from?damage.??This?lining?system?needs?little?to?no?maintenance.??There?were?two?types?of? liners?used:?PVC?and?polyester.??Each?performed?equally?as?well.? ? The?performance?of?synthetic?liners?without?a?protective...

Karimov, Askar; Leigh, Eric; Fipps, Guy

309

Analyzing Massive Machine Maintenance Data in a Computing Cloud  

Science Journals Connector (OSTI)

We present a novel framework, CloudView, for storage, processing and analysis of massive machine maintenance data, collected from a large number of sensors embedded in industrial machines, in a cloud computing environment. This paper describes the architecture, ... Keywords: Sensors,Real time systems,Data analysis,Reliability,Cloud computing,Wind turbines,Maintenance engineering,MapReduce,Fault prediction,machine data analysis,case-based reasoning,cloud computing,Hadoop

Arshdeep Bahga; Vijay K. Madisetti

2012-10-01T23:59:59.000Z

310

North Australian Cloud Lines  

Science Journals Connector (OSTI)

A satellite classification and climatology of propagating mesoscale cloud fines in northern Australia is presented. These cloud fines range from long, narrow lines of shallow convection to extensive deep convective squall lines with mesoscale ...

W. Drosdowsky; G. J. Holland

1987-11-01T23:59:59.000Z

311

DOE/EIS-0285-SA-139: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Little Goose-Lower Granite Corridor Maintenance (4/3/03)  

Broader source: Energy.gov (indexed) [DOE]

9-Little Goose-Lower Granite Corridor Maintenance 9-Little Goose-Lower Granite Corridor Maintenance William Erickson Natural Resource Specialist - TFP/Walla Walla Proposed Action: Vegetation Management for the Little Goose-Lower Granite #1 and #2 Transmission Line Corridor from Towers 4/3 to 8/1. The right-of-way has an easement width of 258 feet and contains two 500kV Single Circuit Transmission Lines. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced in the attached checklist. Location: The subject right-of-way is located in Columbia County, WA., being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: The work will be accomplished by an Integrated Vegetation Management approach using a combination of manual, mechanical, herbicides and biological

312

Data Polling Routine (PlotHood) to Generate Weekly Inspection Plots for Fort Hood, Texas  

E-Print Network [OSTI]

. For this part of the project, a weather station that includes temperature, humidity and solar sensors was installed at the west substation of Ft. Hood as part of Phase I of this project. Weekly inspection plots of electricity use at the main substation of Ft...-Phase II, p. ii TABLE OF CONTENTS General Abstract i Disclaimer iii Acknowledgments iv Provide Data Polling and Inspection Plots Generation Routine (PlotHood) Executive Summary 2 Existing Monitoring System 3 a- ESL Weather Station at the West Substation. 3...

Saman, N. F.; Reddy, T. A.; Haberl, J. S.; Claridge, D. E.; Turner, W. D.

1996-01-01T23:59:59.000Z

313

Reliability centered maintenance of power transformers and circuit breakers  

SciTech Connect (OSTI)

At the Bonneville Power Administration (BPA), we have historically maintained high voltage equipment. Including transformers and power circuit breakers, on a time driven basis. While this has served our needs in the past, newer methods are needed to effectively maintain the power system in future years. Today aging equipment, maintenance backlogs, and budget constraints are a reality. BPA has initiated a research and development project to examine reliability centered maintenance (RCM) as an alternative to time based maintenance on high voltage equipment. Under RCM, the performance of each place of equipment is to be monitored by observing many operating parameters. For example, with circuit breakers we will observe (measure) the trip time, accumulated contact wear using I{sup 2}T, timing of the mechanism, plus several other parameters. Equipment performing below a predetermined level, or equipment having accumulated a large amount of ``usage`` will receive maintenance. The maintenance will restore full performance and preserve an acceptable service life for that piece of equipment. To develop and evaluate RCM concepts, BPA is installing a prototype system at our Alvey Substation on 4 transformers and 25 breakers.

Purucker, S.L.; Goeltz, R.T. [Oak Ridge National Lab., TN (United States); Hemmelman, K.; Price, R. [Bonneville Power Administration, Van Couver, WA (United States)

1992-08-01T23:59:59.000Z

314

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

315

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect (OSTI)

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

316

Germ-line Allele  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Germ-line Allele Germ-line Allele Name: Rachel Location: N/A Country: N/A Date: N/A Question: Can you please explain a "germ-line allele" to me! It is very important for a research paper I am writing about breast cancer. Replies: Mutations in genes are only able to be passed to the offspring if they are found in gametes (egg, sperm) mutations that occur in body cells other than gametes are usually not important because the cells can be replaced and they die eventually. The only way a characteristic can be passed to the offspring is through the eggs and sperm, so if there is a mutation in one these cells, the offspring can inherit the mutation. So a germ-line cell is a gamete. And a germ line allele is a version of the trait that is passed to the offspring through the germ line cell (or gamete).

317

Nematostatics of triple lines  

Science Journals Connector (OSTI)

The Landau–de Gennes model for nematic liquid crystal bulk and interfaces has been extended to nematic triple lines involving the intersection of two isotropic fluids and one nematic liquid crystalline phase. A complete set of bulk, interface, and triple line force and torque balance equations has been formulated. The triple line force and torque balance equations have linear, interfacial, and bulk contributions. The bulk contributions appear as junction integrals, the surface contributions as junctions sums, and the line contributions as gradients of stresses. Reduction of dimensionality from three to one dimensional creates the following effects: (a) bulk terms enter interfacial balances as surface jumps and line balances as junction integrals, and (b) surface terms enter linear balances as junction sums. Line stress and torque equations are derived using classical liquid crystal models. The correspondence between line stress and line torque and their surface and bulk analogs is established. The triple line force and torque balance equations are use to analyze the contact angle in a nematic lens lying at the interface between two isotropic fluids, when the prefered surface orientation is tangential. The effect of anisotropy and long range elasticity on triple line phases is established. Under weak anchoring the contact angle is shown to be a function of the anchoring energy at the nematic-isotropic interface, while under strong anchoring conditions the contact angle is a function of the Peach-Koehler force that originates from bulk long range elasticity and acts on the triple line. The use of the complete set of balance equations removes the classical inconsistency in force balances at a contact line by properly taking into account long range (bulk gradient elasticity) and anisotropic (interfacial anchoring elasticity) effects.

Alejandro D. Rey

2003-01-30T23:59:59.000Z

318

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

319

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

O&M Best Practices Guide, Release 3.0 6.1 O&M Best Practices Guide, Release 3.0 6.1 Chapter 6 Predictive Maintenance Technologies 6.1 Introduction Predictive maintenance attempts to detect the onset of a degradation mechanism with the goal of correcting that degradation prior to significant deterioration in the component or equipment. The diagnostic capabilities of predictive maintenance technologies have increased in recent years with advances made in sensor technologies. These advances, breakthroughs in component sensitivities, size reductions, and most importantly, cost, have opened up an entirely new area of diagnostics to the O&M practitioner. As with the introduction of any new technology, proper application and TRAINING is of

320

Request for Information - Operations and Maintenance (O & M) Support  

Broader source: Energy.gov (indexed) [DOE]

Request for Information - Operations and Maintenance (O & M) Request for Information - Operations and Maintenance (O & M) Support Services for the iManage Request for Information - Operations and Maintenance (O & M) Support Services for the iManage Request for Information (THIS IS NOT A NOTICE OF SOLICITATION ISSUANCE) This is a Special Notice that includes a Request for Information (RFI) to receive comments regarding the attached draft Performance Work Statement (PWS), notice regarding an upcoming Industry Day, and notice regarding one-on-one conferences. This Special Notice is issued solely for information and planning purposes - it does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. This RFI does not commit the Government to contract for any supply or service

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Spring Home Maintenance: Windows, Windows, Windows! | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Spring Home Maintenance: Windows, Windows, Windows! Spring Home Maintenance: Windows, Windows, Windows! Spring Home Maintenance: Windows, Windows, Windows! April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Use these tips for window maintence and treatments to save energy this spring. The beginning of spring marks the point in the year when I'm cleaning, purging the house of things I no longer need, and updating my home on needed repairs. This year, I'm focusing on how to lower my energy bills

322

New Services for Building Maintenance Enabled by Building Automation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

New Services for Building Maintenance Enabled by Building Automation New Services for Building Maintenance Enabled by Building Automation Systems Speaker(s): Heikki Ihasalo Date: May 17, 2007 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Peng Xu Today's building automation systems enable building systems integration and access to information from a variety of sources, e.g. fire alarm systems, access control, security systems, lighting and control systems. With the help of Internet technology and XML (Extensible Markup Language) building automation systems can also connect to other enterprise\ applications such as facility management software, maintenance management systems, ERP or financial systems. New applications are also emerging to manage energy consumption in buildings, for example demand response and fault detection

323

Dam Construction and Maintenance (Minnesota) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Construction and Maintenance (Minnesota) Construction and Maintenance (Minnesota) Dam Construction and Maintenance (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Water Buying & Making Electricity Program Info State Minnesota Program Type Siting and Permitting Dams may be constructed, improved, or repaired on private, non-navigable waters subject to certain timelines; however, previously-developed hydropower mechanisms cannot be disrupted. The State may also choose to

324

Spring Home Maintenance: Windows, Windows, Windows! | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Home Maintenance: Windows, Windows, Windows! Home Maintenance: Windows, Windows, Windows! Spring Home Maintenance: Windows, Windows, Windows! April 26, 2013 - 11:42am Addthis Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Caulking is an easy way to reduce air leakage around your windows. | Photo courtesy of ©iStockphoto.com/BanksPhotos Erin Connealy Communications Specialist, Office of Energy Efficiency and Renewable Energy How can I participate? Use these tips for window maintence and treatments to save energy this spring. The beginning of spring marks the point in the year when I'm cleaning, purging the house of things I no longer need, and updating my home on needed repairs. This year, I'm focusing on how to lower my energy bills

325

Operations and Maintenance Program Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Management Program Management Operations and Maintenance Program Management October 4, 2013 - 5:11pm Addthis Effective management is critical to any operations and maintenance (O&M) program. The management function should bind the distinct parts of the O&M program into a cohesive entity. The following section outlines the major components of effective O&M management, including: Program Structure: Outlines five distinctive functions making up the O&M organization: Operations, Maintenance, Engineering, Training, and Administration (OMETA) Management Support: Details the importance of gaining management support to an effective O&M program, and how to gain that support Program Implementation: Provides an overview of implementing an effective O&M program and how to maintain that program into the future

326

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

Chapter 4 Computerized Maintenance Chapter 4 Computerized Maintenance � Management System � 4.1 Introduction A computerized maintenance management system (CMMS) is a type of management software that performs functions in support of management and tracking of O&M activities. 4.2 CMMS Needs Assessment In determining the need for a CMMS, facility managers should assess their current mode of operation. Key questions to ask include: * Do you have an effective way to generate and track work orders? How do you verify the work was done efficiently and correctly? What is the notification function upon completion? * Are you able to access historical information on the last time a system was serviced, by whom, and for what condition? * How are your spare-parts inventories managed and controlled? Do you have

327

Remote maintenance for a new generation of hot cells  

SciTech Connect (OSTI)

For several years the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required.

Feldman, M.J.; Grant, N.R.

1987-01-01T23:59:59.000Z

328

EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability.

329

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ENERGY MANAGEMENT PROGRAM ENERGY MANAGEMENT PROGRAM Release 3.0 Operations & Maintenance Best Practices A Guide to Achieving Operational Efficiency August 2010 Release 3.0 Operations & Maintenance Best Practices A Guide to Achieving Operational Efficiency G. P. Sullivan (a) R. Pugh A. P. Melendez W. D. Hunt August 2010 Prepared by Pacific Northwest National Laboratory for the Federal Energy Management Program U.S. Department of Energy (a) Efficiency Solutions, LLC Disclaimer This report was sponsored by the United States Department of Energy, Office of Energy Efficiency and Renewable Energy, Federal Energy Management Program. Neither the United States Government nor any

330

A Self-Regulation Program for Maintenance of Weight Loss  

Science Journals Connector (OSTI)

...diet, activity, and use of behavioral strategies. At each assessment, participants were weighed with a calibrated scale while they were wearing light street clothes, and they completed the Paffenbarger Physical Activity Questionnaire and the Block Food Frequency Questionnaire. They also reported their... This maintenance program was based on self-regulation theory that included daily self-weighing. The authors tested the efficacy of delivering the program face to face or over the Internet as compared with the provision of a quarterly newsletter. The interventions improved maintenance of weight loss, particularly when delivered face to face.

Wing R.R.Tate D.F.Gorin A.A.Raynor H.A.Fava J.L.

2006-10-12T23:59:59.000Z

331

Development of low-maintenance end treatment for concrete barriers  

E-Print Network [OSTI]

-SCALE RUBBER CYLINDER . . . . 38 12. FULL-SCALE STATIC TEST CONFIGURATION 13. DYNAMIC TESTS OF FULL-SCALE RUBBER CYLINDERS 47 48 14. PHOTOGRAPHS OF PROTOTYPE LOW-MAINTENANCE END TREATMENT . . . 57 15. TEST VEHICLE DAMAGE FROM TEST 1, 30 MPH IMPACT 16.... END TREATMENT AFTER TEST 1 60 61 17. END TREATMENT AND TEST VEHICLE AFTER TEST 2, 40 MPH IMPACT . 63 18, VEHICLE DAMAGE AFTER TEST 3 19. LOW-MAINTENANCE END TREATMENT AFTER TEST 3 20. SUMMARY OF TEST 3 21. VEHICLE AND END TREATMENT DAMAGE AFTER...

Sicking, Dean

2012-06-07T23:59:59.000Z

332

Geodesic Lines, . . . Covariant . . .  

E-Print Network [OSTI]

Geodesic Lines, . . . Covariant . . . Home Page Title Page Page 781 of 818 Go Back Full Screen Close Quit 14.11. Geodesic Lines, Local Gauss-Bonnet Theorem Geodesics play a very important role in surface theory and in dynamics. One of the main reasons why geodesics are so important

Gallier, Jean

333

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

334

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

335

Routine application of the in situ soil analysis technique by the Yankee Atomic Environmental Laboratory  

SciTech Connect (OSTI)

Using a technique developed by the Environmental Measurements Laboratory (EML) for field spectrometry, the Yankee Atomic Environmental Laboratory (YAEL) has routinely performed in situ soil measurements in the vicinity of five nuclear power stations for more than a decade. As a special research endeavor, several locations at the FURNAS Angra 1 site in Brazil having high natural backgrounds were also measured in 1987. The technical basis of the technique, a comparison of soil radionuclide concentrations predicted by the in situ technique to soil radionuclide concentrations predicted by the in situ technique to soil analyses from the same sites, the advantages and disadvantages of the in situ methodology, and the evolution of the portable equipment utilized at YAEL for the field measurements are presented in this paper.

Murray, J.C.; McCurdy, D.E.; Laurenzo, E.L.

1989-01-01T23:59:59.000Z

336

Modeling maintenance projects risk effects on ERP performance  

Science Journals Connector (OSTI)

Worldwide organizations have made important efforts to replace their legacy information applications by ERP (Enterprise Resource Planning) solutions. However, a suitable system implementation does not guarantee the ERP adoption success. This also depends ... Keywords: ERP maintenance, Simulations, Soft computing, Software project risks, System performance

Cristina López; Jose L. Salmeron

2014-03-01T23:59:59.000Z

337

Maintenance of Complex Systems University of Salford, 22  

E-Print Network [OSTI]

of Strathclyde) 1115-1120 Lifetime Data Analysis Dr Keming Yu (Brunel University) 1120-1150 Control Charts for Reliability and Maintenance Monitoring Prof. Min Xie (City University Hong Kong) 1150-1200 Break 1200 University) 1230-1300 Bayesian Modelling of Aging Processes in Nuclear Reactor Cores Dr Nick Warren (Health

Mitchener, Paul

338

Periodic NDE for Bridge Maintenance Ralf W. Arndt  

E-Print Network [OSTI]

Periodic NDE for Bridge Maintenance Ralf W. Arndt NRC Research Associate U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA ralf.arndt@fhwa.dot.gov Frank Jalinoos Program Manager U.S. Federal Highway Administration NDE Center 6300 Georgetown Pike McLean, VA 22101, USA

Huston, Dryver R.

339

Constrained-cost maintenance and measurability of degradation  

Science Journals Connector (OSTI)

......the timing problem of when to repair and the neural net handles which bridges in the net- work to repair. MAINTENANCE AND MEASURABILITY...track, bridge, or stretch of pipeline--is classified as being...chosen one of a finite set R of repair actions. The transition probability......

J. I. ANSELL; T. W. ARCHIBALD; L. C. THOMAS

1998-03-01T23:59:59.000Z

340

ORIGINAL ARTICLE The maintenance of hybrid zones across a  

E-Print Network [OSTI]

ORIGINAL ARTICLE The maintenance of hybrid zones across a disturbance gradient ME Dorken and JR of genetically divergent lineages in hybrid zones can be maintained by ecological differences (dispersal-independent `ecotonal' hybrid zones), by fre- quency- and density-dependent interference when they intermingle and mate

Dorken, Marcel

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Development of a maintenance effectiveness monitoring program for CANDU reactors  

Science Journals Connector (OSTI)

A procedural program to monitor the effectiveness of maintenance activities was developed for CANDU reactors and, to confirm its applicability, was tested on a CANDU power plant being operated by the Korea Hydro & Nuclear Power Co. The monitoring program is based on a methodology utilizing probabilistic risk information to meet US regulation 10CFR50.65, which is known as the Maintenance Rule. There are many cases in which the Maintenance Rule is applied to Light Water Reactor systems, including \\{PWRs\\} and BWRs. However, it has not been applied to a CANDU Reactor System thus far. In this paper, a procedure to set up a maintenance effectiveness monitoring program is presented with an emphasis on its application to the CANDU system. Relevant solutions to problems that were encountered are introduced to make the program more suitable for the characteristics of CANDU systems. In the end, an application of the program to an operating CANDU power plant is discussed to evaluate the performance status of the plant.

Dong Wook Jerng; Hee Seung Chang; Tae Young Ju

2011-01-01T23:59:59.000Z

342

Maintenance Assessment Plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Broader source: Energy.gov (indexed) [DOE]

MAINTENANCE MAINTENANCE Assessment Plan NNSA/Nevada Site Office Facility Representative Division Performance Objective: An effective facilities maintenance program should optimize the material condition of components and equipment to support safe and effective operations and ensure the peak performance and reliability of those systems and equipment important to operations. Criteria: The program, facility or operation has a Maintenance Implementation Plan (MIP), or equivalent document, which defines and documents the approach to conduct of maintenance. The maintenance organization structure is well defined and understood. Responsibilities, organizational interfaces, and administrative activities are adequately defined and implemented to provide timely availability of

343

The air transportation industry birthplace of reliability-centered maintenance  

SciTech Connect (OSTI)

The 1980s and 1970s provided a timely opportunity for examining and radically changing the process called {open_quotes}preventive maintenance{close_quotes} as it is applied to the aircraft used for scheduled air transportation. The Federal Aviation Administration and four major airlines, United, American, Pan American and Trans World, were the {open_quotes}principals{close_quotes} in that process. While United`s work with the FAA on the Boeing 737 had opened the door a crack, the Boeing 747 presented a major opportunity to radically improve the process for maintenance program design. That program was guided by the results of United`s analyses of failure data from operations of several fleets, each larger than 100 aircraft, and the concurrent experience of American, Pan American and Trans World. That knowledge provided the insights necessary to support an entirely different approach to maintenance program design. As a result, while United`s existing maintenance program required scheduled overhaul of 339 items on each DC-8, it required overhaul of only 8 items on the B-7471 Although the initial thrust of that work focused on components of active systems, there was concurrent work focused on items whose principal function was to carry the loads associated with operations. That program focused on the classification of structurally-significant items and their classification as {open_quotes}safe life{close_quotes} or {open_quotes}damage tolerant{close_quote} to determine what periodic replacements or repeated inspections were required. That work came to the attention of the Department of Defense which supported preparation of the book-length report by F. Stanley Nowlan and Howard F. Heap at United Airlines entitled {open_quote}Reliability-Centered maintenance{close_quotes}.

Matteson, T.D.

1996-08-01T23:59:59.000Z

344

Holes in Spectral Lines  

E-Print Network [OSTI]

The decay of an atom in the presence of a static perturbation is investigated. The perturbation couples a decaying state with a nondecaying state. A "hole" appears in the emission line at a frequency equal to the frequency ...

Fontana, Peter R.; Srivastava, Rajendra P.

1973-06-01T23:59:59.000Z

345

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

346

Lifting by Convergence Lines  

Science Journals Connector (OSTI)

The lifting depth of a convergence line in an unstratified boundary layer beneath a stably stratified atmosphere is examined with both analytical and numerical models. Cases are considered with and without flow in the layer above the convergence ...

N. Andrew Crook; Joseph B. Klemp

2000-03-01T23:59:59.000Z

347

Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Maintenance and Safety Maintenance and Safety of Hybrid and Plug-In Electric Vehicles to someone by E-mail Share Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Facebook Tweet about Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Twitter Bookmark Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Google Bookmark Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Delicious Rank Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on Digg Find More places to share Alternative Fuels Data Center: Maintenance and Safety of Hybrid and Plug-In Electric Vehicles on AddThis.com...

348

Long-Term Surveillance Operations and Maintenance Fiscal Year 2014 Year-End Summary Report  

Broader source: Energy.gov [DOE]

The Long-Term Surveillance Operations and Maintenance (LTS–O&M) subtask has a critical long-term surveillance and maintenance (LTS&M) role for the U.S. Department of Energy (DOE) Office of...

349

Installation, Maintenance, and End of Life of a Gas-Insulated Substation  

Science Journals Connector (OSTI)

The metal-enclosed gas-insulated switchgear is made as to ensure the best possible relationship between design, used materials, maintenance effort and maintenance intervals. The result is optimized utilization...

Dipl. Ing. Wolfgang Degen

2004-01-01T23:59:59.000Z

350

Policy #1001 Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY  

E-Print Network [OSTI]

Policy #1001 ­ Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY University Policy Policy #1001 DEVELOPMENT, APPROVAL AND MAINTENANCE OF UNIVERSITY POLICY Responsible 4, 2012 A. PURPOSE This policy defines the process for developing, reviewing, approving

351

Project Profile: Maintenance-Free Stirling Engine for High-Performance...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling...

352

Innovative Contracting Strategies forInnovative Contracting Strategies for Transportation MaintenanceTransportation Maintenancepp  

E-Print Network [OSTI]

Innovative Contracting Strategies forInnovative Contracting Strategies for TransportationResearch Methodology Research Findings and DeliverablesResearch Findings and Deliverables Maintenance Contracting Strategy Selection Framework Maintenance Contracting Strategy Selection Guide Case St dies on Inno ati e

Texas at Austin, University of

353

IoT-Based Maintenance Process Design for Fusion Reactor Remote Handling System  

Science Journals Connector (OSTI)

Nuclear fusion is one of the most important ways ... to risk of ionizing radiation, the nuclear fusion reactor will relay on remote handling maintenance to ... the maintenance efficiency. The basic structure of fusion

Ruonan Zhang; Xinbao Liu

2014-12-01T23:59:59.000Z

354

Line tension vector thermodynamics of anisotropic contact lines  

Science Journals Connector (OSTI)

Multiphase materials with intersecting diving surfaces give rise to contact lines. A line tension vector thermodynamics formalism is developed and used to analyze contact line problems in the presence of anisotropy, taking into account two elastic modes: change in contact line length and change in contact line orientation. Using this formalism, the contact line-shape equation is derived, and the renormalization of the line tension due to anisotropy is characterized. The correspondence and analogies between the shape equation for anisotropic surfaces (Herring equation) and the shape equation for contact lines is established. Line energies for nematic liquid crystals, representative of generic anisotropic contact lines, are used to derive a shape equation that takes into account ambient orientation effects. It is found that anisotropic line tension may promote bending and chiral modes to avoid unfavorable orientations of the contact line with respect to the ambient nematic ordering.

Alejandro D. Rey

2004-04-30T23:59:59.000Z

355

Survey of Companies in Machine Health Monitoring and Maintenance Company Capability Software Application Modeling Technique  

E-Print Network [OSTI]

through thresholds FLIR Systems, INC www.flir.com · Predictive maintenance solutions · Infra red cameras

Huang, Samuel H.

356

E-Print Network 3.0 - aircraft maintenance personnel Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

George Mason University, Center for Air Transportation Systems Research Collection: Energy Storage, Conversion and Utilization ; Engineering 2 Airline Fleet Maintenance:...

357

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

358

Operations and Maintenance Program Implementation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Implementation Program Implementation Operations and Maintenance Program Implementation October 4, 2013 - 5:16pm Addthis Implementing an effective operations and maintenance (O&M) program requires patience and persistence. This is especially true since no universal plan fits all Federal agencies. While no universal plan exists, Federal Energy Management Program (FEMP) recommends the following common steps for implementing O&M programs: Start small: Choose a project that is manageable and can be completed in a short period of time (e.g., six months to one year) Select troubled equipment: Choose a project with visibility because of problematic equipment history Minimize risk: Choose a project that provides immediate and positive results; this project must be successful, so risk of failure should be

359

Operations and Maintenance Management Support | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Support Management Support Operations and Maintenance Management Support October 4, 2013 - 5:14pm Addthis Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows activities to be scheduled with the same priority as other management actions. Mission Statement Federal O&M programs should start with a mission statement. This succinct statement should outline the program's main goals, which should be aligned to the overarching goals of site management. Aligning O&M program goals with site goals allows management to understand how O&M supports the facility across the board. It is important to involve both management and facility staff during

360

Operations and Maintenance for Major Equipment Types | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

for Major Equipment Types for Major Equipment Types Operations and Maintenance for Major Equipment Types October 7, 2013 - 9:53am Addthis Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc. No single resource covers all equipment in use by Federal agencies, and listing major equipment types is beyond the scope of this website. Instead, the Federal Energy Management Program (FEMP) outlines major equipment types within chapter 9 of the Federal Energy Management Programs's (FEMP) O&M Best Practices Guide. The FEMP O&M Best Practices Guide focuses on: Boilers Steam traps Chillers Cooling towers Energy management and building automation systems Air handling systems

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

Chapter 8 Metering for Operations and Maintenance Chapter 8 Metering for Operations and Maintenance 8.1 Introduction Metering and sub-metering of energy and resource use is a critical component of a comprehensive O&M program. Metering for O&M and energy/resource efficiency refers to the measurement of quantities of energy delivered, for example, kilowatt-hours of electricity, cubic feet of natural gas, pounds of steam, and gallons of water. Metering may also involve identifying times- of-use for the various energy sources, the instantaneous demand for energy, as well as identify energy use for a collection of buildings, individual buildings, rooms, or specific equipment (e.g., a boiler, chiller, or motor). Facility resource metering has a variety of applications for the Federal facility energy

362

Longview District Operations and Maintenance Headquarters: Environmental assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

Not Available

1992-03-01T23:59:59.000Z

363

Longview District Operations and Maintenance Headquarters : Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives.

United States. Bonneville Power Administration.

1992-03-01T23:59:59.000Z

364

Steam turbine restart temperature maintenance system and method  

SciTech Connect (OSTI)

A restart temperature maintenance system is described for a steam turbine system; the steam turbine system comprising a steam turbine, the turbine including a rotation shaft, an outer metal shell means. The restart temperature maintenance system consists of: (a) fastener means affixed to the outer surface of the shell means at predetermined positions; (b) air gap spacer means affixed to the outer surface of the shell means, the air gap spacer means substantially covering the shell means; (c) a plurality of electric heating blanket means of predetermined size and shape positioned in insulative relationship over the air gap spacer means and the heating blanket means maintained in predetermined position by the fastener means; (d) heat sensor means affixed to the outer metal shell means of the steam turbine in predetermined position; (e) power supply means for supplying power to the heating blanket means; (f) heat sensor monitor and controller means connected in circuit between the power supply means and the heat sensor means.

McClelland, T.R.

1986-04-29T23:59:59.000Z

365

Draft of new maintenance standards for LWR in Japan  

SciTech Connect (OSTI)

Activities of development of new maintenance standards for operating nuclear power plant in Japan are described. The work of drafting the standards has been done by the Committee of Nuclear Plant Operation and Maintenance Standards (POMS), that was organized in the Japan Power Engineering and Inspection Corporation under the entrustment from the Ministry of International Trade and Industry. The articles of ASME Section XI related to inspection, flaw evaluation and repair have been examined and modified, if necessary, so as to introduce latest Japanese database and technological knowledge. In the area of repairs, many repair techniques verified in recent years in Japan were incorporated i n addition to those specified in ASME Section XI. Finally major differences between ASME Section XI and the draft of the standards are listed.

Iida, Kunihiro [Shibaura Inst. of Tech., Tokyo (Japan). Dept. of Mechanical Engineering

1996-12-01T23:59:59.000Z

366

Condition-Based Maintenance using Sensor Arrays and Telematics  

E-Print Network [OSTI]

Emergence of uniquely addressable embeddable devices has raised the bar on Telematics capabilities. Though the technology itself is not new, its application has been quite limited until now. Sensor based telematics technologies generate volumes of data that are orders of magnitude larger than what operators have dealt with previously. Real-time big data computation capabilities have opened the flood gates for creating new predictive analytics capabilities into an otherwise simple data log systems, enabling real-time control and monitoring to take preventive action in case of any anomalies. Condition-based-maintenance, usage-based-insurance, smart metering and demand-based load generation etc. are some of the predictive analytics use cases for Telematics. This paper presents the approach of condition-based maintenance using real-time sensor monitoring, Telematics and predictive data analytics.

Palem, Gopalakrishna

2013-01-01T23:59:59.000Z

367

Routine environmental audit of the Sandia National Laboratories, California, Livermore, California  

SciTech Connect (OSTI)

This report documents the results of the Routine Environmental Audit of the Sandia National Laboratories, Livermore, California (SNL/CA). During this audit the activities the Audit Team conducted included reviews of internal documents and reports from preview audits and assessments; interviews with US Department of Energy (DOE), State of California regulators, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted from February 22 through March 4, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety, and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements. The audit`s functional scope was comprehensive and included all areas of environmental management and a programmatic evaluation of NEPA and inactive waste sites.

Not Available

1994-03-01T23:59:59.000Z

368

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Broader source: Energy.gov (indexed) [DOE]

New Construction of Distribution Lines, Service Lines, and New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Environmental Regulations Provider New York State Public Service Commission Any proposed construction of distribution lines, service lines, and appurtenant facilities to electric utilities located near scenic areas of

369

REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM  

Broader source: Energy.gov (indexed) [DOE]

REQUIREMENTS BASED SURVEILLANCE AND REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS INTERVIEW FORM General Information: A. Evaluator:_______________________ Organization:___________________ Ph:_________________ B. Interviewee:_____________________ Organization:____________________ Ph:_________________ C. Activity Name :_____________________________________________________ General/Administrative Support Mission/Facility Support (Circle One) D. Safety Related: _____Yes _____No E. Procedure #: _______________________________________________________ F. Charge Number: _____________________________________________________ G. Frequency for Conducting the Activity: (Circle One) Hourly Shiftly Daily Weekly Bi-weekly Monthly Quarterly Semi-Annually Annually

370

Open source software development and maintenance: an exploratory analysis  

E-Print Network [OSTI]

-scale development projects (Aoki et al. 2001; German 2004; Kerstetter et al. 2003; Markus et al. 2000; Scacchi 2004b; Wheeler 2003). Some have looked into issues like participation in OSS projects (Bergquist and Ljungberg 2001; Crowston and Scozzi 2002; Dempsey.... According to estimates, software maintenance consumes more than 80% of the lifecycle costs of software systems (Erlikh 2000; Moad 1990). From the point of view of organizational resources, IS departments spend 50-80% of their budgets on software...

Raja, Uzma

2009-06-02T23:59:59.000Z

371

Ensuring Physicians' Competence — Is Maintenance of Certification the Answer?  

Science Journals Connector (OSTI)

Pressed by their leaders, external stakeholders, and a public troubled by lapses in the quality of care and unsustainable cost increases, physicians are facing stiffer challenges in initiatives designed to link more closely the goals of learning with the delivery of better care and measures of greater... Maintenance of certification programs sponsored by the American Board of Medical Specialties and its member boards were designed to improve and assess physicians' clinical competence. The authors discuss the history of MOC and current controversies.

Iglehart J.K.; Baron R.B.

2012-12-27T23:59:59.000Z

372

The Engineered Approach to Energy and Maintenance Effective Steam Trapping  

E-Print Network [OSTI]

., Chemical Engineering 9/1/75. 4. Maintenance Engineering, May 1976. 5. "How Much Does Lost Steam Cost",Armstrong Machine works, Hydrocarbon Processing, p.129, Jan. 1976. 6. "Setter Steam Trapping Cuts Energy Waste", wesley Yates, Yarway Corp..., Georgia Tech Industrial Energy Extension Service, Chemical Engineering, 2/11/80. 10. ''Basic Facts & Enerqv Saving Tips" ,Lawrence R. O'Dell, Armstrong Machine Works, Heating/Piping/ Air Conditioning, May 1977. 11. Steam Trap Report - Energy Loss...

Krueger, R. G.; Wilt, G. W.

1980-01-01T23:59:59.000Z

373

PP&L experience with substation reliability centered maintenance  

SciTech Connect (OSTI)

This paper is intended to present a summary of Pennsylvania Power & Light`s (PP&L) experience with substation Reliability Centered Maintenance (RCM). The purpose of this summary is to first explain the process used by PP&L to implement substation RCM, second to explain the differences that are apparent from the use of the classical RCM analysis as compared to the method used by PP&L, and third to provide several insights into the process.

Santarelli, P.D. [Pennsylvania Power & Light Company, Hazleton, PA (United States)

1996-08-01T23:59:59.000Z

374

Object-oriented development of EMS maintenance and documentation tools  

SciTech Connect (OSTI)

This paper describes the use of an object-oriented application framework to implement a PC-based tool kit for use by EMS software support personnel in software maintenance activities including training, documentation development, and trouble-analysis. In addition to a description of the development of the underlying code which provides the tool kit functionality, the paper describes the steps necessary to instantiate the tool kit on a given EMS subsystem.

Sanders, C.W. [Entergy Services, Inc., Pine Bluff, AR (United States). Power System Operations Dept.

1995-12-31T23:59:59.000Z

375

Article Published on LED Lumen Maintenance and Light Loss Factors  

Broader source: Energy.gov [DOE]

An article has been published in LEUKOS: The Journal of the Illuminating Engineering Society of North America (IES) that may be of interest to the solid-state lighting community. Entitled "Lumen Maintenance and Light Loss Factors: Consequences of Current Design Practices for LEDs," the article was written by Michael Royer of Pacific Northwest National Laboratory and discusses complications related to the lamp lumen depreciation (LLD) light loss factor and LEDs.

376

ExxonMobil Olefins Plant Projects, Maintenance and Optimizations  

E-Print Network [OSTI]

are endothermic and there are drastic differences in temperature and pressure across the process Quench & Heat Recovery Steam Cracker Furnace Compression Refrigeration Fractionation Cracked Products ProductsFeed Fuel 60% 35% 5% Ethylene Plant Energy Consumption...ExxonMobil Olefins Plant Projects, Maintenance and Optimizations Matt Neely Utilities Coordinator ExxonMobil Baytown Olefins Plant 2014 IETC May 21, 2014 ESL-IE-14-05-02 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New...

Neely, M. M.

2014-01-01T23:59:59.000Z

377

Leon County Extension -615 Paul Russell Rd. -Tallahassee Limited Commercial Landscape Maintenance Certification  

E-Print Network [OSTI]

Leon County Extension - 615 Paul Russell Rd. - Tallahassee Limited Commercial Landscape Maintenance Certification Training Class & Exam Wednesday, March 21, 2012 If you work for a commercial landscape maintenance requires that you have a limited commercial landscape maintenance certification. To take the test

Watson, Craig A.

378

Low-maintenance Landscape Plants for South Florida Jody Haynes1  

E-Print Network [OSTI]

Low-maintenance Landscape Plants for South Florida Jody Haynes1 , John McLaughlin2 , Laura Vasquez3 landscape plants suitable for south Florida. The resulting list includes over 350 low-maintenance plants in the Florida Yards & Neighborhoods (FYN) program in Miami-Dade County for a list of recommended low-maintenance

Jawitz, James W.

379

Problem Solution Results Conclusion Predictive maintenance for the heated hold-up tank  

E-Print Network [OSTI]

Problem Solution Results Conclusion Predictive maintenance for the heated hold-up tank B. de, Helsinki Predictive maintenance for the heated hold-up tank #12;Problem Solution Results Conclusion Outline 1 Maintenance problem The heated hold-up tank Optimization problem 2 Numerical solution Mathematical

De Saporta, Benoîte

380

Planning and optimizing the maintenance of paper production systems in a paper plant  

Science Journals Connector (OSTI)

Manufacturing and production plants operate physical assets that deteriorate with usage and time, thus, maintenance actions are required to restore the assets back to their original predetermined operational conditions. But since, organizational resources ... Keywords: Availability, Life cycle cost, Maintenance planning, Petri nets, Preventive maintenance, Simulink

Anish Sachdeva; Dinesh Kumar; Pradeep Kumar

2008-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

382

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect (OSTI)

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

383

Apparent ridges for line drawing  

E-Print Network [OSTI]

Non-photorealistic line drawing depicts 3D shapes through the rendering of feature lines. A number of characterizations of relevant lines have been proposed but none of these definitions alone seem to capture all ...

Judd, Tilke (Tilke M.)

2007-01-01T23:59:59.000Z

384

Harry: Between the Lines  

E-Print Network [OSTI]

I 5. ; ..v^-rr>.>-'- j??!*f fefi ( -??;r' ,, ;rl&.i:-??t**rK&d t ? -?, .- 'c-y. ~ :'y$???M .'??. ??.v-'-/i / ' , *? I te / - 5- MAGNUM FORCE: HARRY Between The Lines by Ruth Kurz Seeing Harry, instead of The Callahan... Image. (1973) Special thanks to Teri White for the original "first time"*scene. Further thanks JL MW AW DMc A production of AD NAUSEUM PRESS 3613 West Park Road Cleveland, Ohio 44111 MAGNUM FORCE: HARRY Between The Lines by ruth kurz ' "I...

Kurz, R.; White, T.

1982-01-01T23:59:59.000Z

385

Career opportunities Dental hygiene is routinely listed as one of today's top-ten career fields, offering  

E-Print Network [OSTI]

* or waiver Professional curriculum hours Preclinical Dental Hygiene 5 Clinical Radiology 4 Dental HygieneCareer opportunities Dental hygiene is routinely listed as one of today's top-ten career fields, offering opportunities in a wide range of settings including private dental offices, public health agencies

386

How CEOAS Publishing Can Help with Proposals PIs are responsible for submissions to Sponsored Programs. For routine submissions, Publishing  

E-Print Network [OSTI]

How CEOAS Publishing Can Help with Proposals PIs are responsible for submissions to Sponsored Programs. For routine submissions, Publishing (pubs@coas.oregonstate.edu) can help with editing, as there is available time. Facets with which Publishing can help: Project Description Proofread project

Kurapov, Alexander

387

Routine Analysis of Oxygenates and Benzene in Retail Motor Fuel: A Survey by the State of Alabama  

Science Journals Connector (OSTI)

......gasoline. Figure 4. Chromatogram of gasoline run on TCEP and methyl silicone column...for the routine analysis of 1600 gasoline samples. Results indicate that...that benzene is often found in straight- run gasoline at concentrations of 1 to 2......

Guy Vaughan Johnson

1987-02-01T23:59:59.000Z

388

Guideline to good practices for maintenance management involvement at DOE nuclear facilities  

SciTech Connect (OSTI)

The purpose of the Guideline to Good Practices for Maintenance Management Involvement at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used to verify adequacy of and/or modify existing maintenance management programs, or to develop new programs. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter 2, Elements 14 and 16. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing maintenance management programs that are applicable to their facility.

Not Available

1993-03-01T23:59:59.000Z

389

Guideline to good practices for types of maintenance activities at DOE nuclear facilities  

SciTech Connect (OSTI)

The purpose of the Guideline to Good Practices for Types of Maintenance at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used for the development and implementation of a properly balanced corrective, preventive and predictive maintenance program at DOE nuclear facilities. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter II, Element 4. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing maintenance programs that are applicable to their facility.

Not Available

1993-03-01T23:59:59.000Z

390

On-line partial discharge monitoring system and data processing using WTST-NST filter for high voltage power cable  

Science Journals Connector (OSTI)

Defects inside insulation of HV XLPE cable accessories can lead to partial discharge (PD) activity. When PD activity happens, leakage current may flow through the grounded line. To acquire the PD current signal, one practicable and effective method is ... Keywords: MRD-MRR algorithm, adaptive WTST-NST filter, condition based maintenance(CBM), on-line monitoring, partial discharge, power cable, stationary noise interference

Hui Wang; Chengjun Huang; Li Zhang; Yong Qian; Junhua Liu; Linpeng Yao; Canxin Guo; Xiuchen Jiang

2009-07-01T23:59:59.000Z

391

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley of Texas: 2011 Ratings and Analysis  

E-Print Network [OSTI]

changes using a lining evaluation form which we developed. For analysis purposes, we grouped all the projects into two general categories: liners with a protective barrier, and liners without a protective barrier. The projects with a protective... barrier performed very well. The synthetic liner significantly reduces seepage, while the shotcrete layer protects the liner from damage. This lining system needs little to no maintenance. There were two types of liners used: PVC and polyester. Each...

Bonaiti, Gabriele; Karimov, Askar; Fipps, Guy

392

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

393

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

394

Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Systems and Plant Equipment  

SciTech Connect (OSTI)

This report presents detailed guidance for the maintenance and testing of modern digital systems. The guidance provides practical means for plants to take advantage of the increased diagnostic and self-test capabilities of these systems. It helps plants avoid mistakes in design and installation that could lead to increased maintenance burden and decreased system reliability and availability.

Hill, D; Scarola, K

2004-10-30T23:59:59.000Z

395

Essential Systems Functionality Inspection Criteria, Approach, and Lines of  

Broader source: Energy.gov (indexed) [DOE]

Essential Systems Functionality Inspection Criteria, Approach, and Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2) Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2) The Essential Systems Functionality (ESF) inspection will evaluate the effectiveness of programs and processes for engineering design and safety basis, construction and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and improvement of selected safety systems. This review will evaluate the effectiveness in maintaining the functionality of these safety systems. The ESF review will be performed in the context of integrated safety management (ISM), although

396

CX-010417: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

417: Categorical Exclusion Determination 417: Categorical Exclusion Determination CX-010417: Categorical Exclusion Determination Above-Ground Routine Transmission Line Maintenance CX(s) Applied: B1.3 Date: 05/17/2013 Location(s): Colorado, Wyoming, Nebraska, Montana, Utah Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) has identified certain routine transmission line maintenance projects which require little or no environmental review and resource agency coordination. Western includes in this determination all routine maintenance activities on transmission lines which typically occur above-ground within existing structure footprints and will cause little or no ground surface disturbance. CX-010417.pdf More Documents & Publications

397

Evaluation of Daphnia ambigua for Routine Aquatic Toxicity Testing at the Savannah River Site  

SciTech Connect (OSTI)

Short-term whole effluent toxicity testing, which is currently a requirement of the U.S. EPA`s National Pollution Discharge Elimination System (NPDES), commonly uses the cladoceran species Ceriodaphnia dubia. Despite the advantages to using a common test species to model the toxic effects of effluents, it could be argued that toxicity test results would be more meaningful if a wider variety of test organisms were commonly used. One particular argument against C. dubia is that tests conducted with this species do not always reflect local, site-specific conditions. The careful selection and use of an indigenous test species would produce a more realistic model of local instream effects and would account for regional differences in water quality. Permitted effluent discharges from Savannah River Site (SRS), a government weapons facility operated by the U.S. Department of Energy, require toxicity testing with C. dubia. However, water quality in these receiving streams is markedly different (lower pH and hardness) from standard laboratory water used for the culturing and testing of C. dubia, and it has been shown that this receiving water presents varying degrees of toxicity to C. dubia. Based on these results, it is possible that toxic effects observed during an effluent study could be the result of test organism stress from the dilution water and not the effects of SRS effluents. Therefore, this study addressed the substitution of C. dubia with an indigenous cladoceran species, Daphnia ambigua for routine regulatory testing at SRS. Given the indigenous nature of this species, combined with the fact that it has been successfully cultured by other investigators, D. ambigua was ideal for consideration as a replacement for C. dubia, but further study of the overall success and sensitivity of laboratory-reared D. ambigua was required. This investigation determined that D. ambigua could be laboratory cultured with only minimal changes to established regulatory protocol and that the life-cycle characteristics of this species were conducive to traditional acute and chronic aquatic toxicity test methods. Acute toxicity tests showed that when comparing LC50 values for C. dubia and D. ambigua, D. ambigua was less sensitive to some toxicants (sodium chloride, copper sulfate, and sodium lauryl sulfate) while more sensitive to others (chlorpyrifos). Results of chronic tests with copper sulfate and sodium chloride resulted in the same NOEC/LOEC values for both species. When exposed to unaltered SRS stream water, C. dubia demonstrated a `toxic` response for two of the three streams tested, while reproduction for D. ambigua was higher in all stream samples. Acute toxicity tests with sodium chloride in stream water, generally followed the sensitivity trend noted in tests conducted with regular laboratory water.

Specht, W.L. [Westinghouse Savannah River Company, Aiken, SC (United States); Harmon, S.M. [University of South Carolina, Columbia, SC (United States)

1997-09-01T23:59:59.000Z

398

Plant maintenance and plant life extension issue, 2007  

SciTech Connect (OSTI)

The focus of the March-April issue is on plant maintenance and plant life extension. Major articles/reports in this issue include: Three proposed COLs expected in 2007, by Dale E. Klein, U.S. Nuclear Regulatory Commission; Delivering behaviors that our customers value, by Jack Allen, Westinghouse Electric Company; Facilitating high-level and fuel waste disposal technologies, by Malcolm Gray, IAEA, Austria; Plant life management and long-term operation, by Pal Kovacs, OECD-NEA, France; Measuring control rod position, by R. Taymanov, K. Sapozhnikova, I. Druzhinin, D.I. Mendeleyev, Institue for Metrology, Russia; and, 'Modernization' means higher safety, by Svetlana Genova, Kozluduy NPP plc, Bulgaria.

Agnihotri, Newal (ed.)

2007-03-15T23:59:59.000Z

399

Building 9401-2 Plating Shop Surveillance and Maintenance Plan  

SciTech Connect (OSTI)

This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes, and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S and M personnel; Provide an S and M plan which identifies and complies with applicable environmental, safety, and health safeguards and security requirements; and Provide a cost effective S and M program for the plating shop, Building 9401-2.

None

1999-05-01T23:59:59.000Z

400

Scha's Parallel Lines Bernhard Nickel  

E-Print Network [OSTI]

Scha's Parallel Lines Bernhard Nickel May 10, 2010 1 Introduction Scha (1981) has a famous example) The single lines run parallel to the double lines. 3 Code for Figure 1 \\begin{figure} \\centering \\setlength{\\unitlength}{.5in} \\begin{picture}(6,4) % first square \\put(0,4){\\line(1,0){4}}% \\put(0,1){\\line(1,0){4}}% \\put(0

Nickel, Bernhard

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

402

Steam-turbine generatorson-line monitoring and availability  

SciTech Connect (OSTI)

Dislocations following the 1973 energy crisis plus the current financial plight of utilities have forced the American power industry to consider availability a primary variable in the design and operation of a power plant. For meeting expected customer demands, raising the availability of existing plants may temporarily offset the need for a new plant. Also, the financial reward for raising availability produces immediate results (e.g., a 1 percent improvement in availability of a 500 MW plant is worth $1 million a year). Average availability of U.S. power plants is currently around 65 percent. The industry believes that 80 percent is achievable. Improvement of operating availability is based on generic problem identification and solution, reducing the frequency of periodic inspections, and minimizing the time to perform required maintenance. Increased stocking of spare parts is a valuable tool for increasing availability. Also, some turbine manufacturers are designing their low-pressure turbines to allow rotor interchangeability. The purchase price of a completely bladed low-pressure rotor by a utility is recovered by reducing maintenance downtime expense and raising unit availability. Interchangeable high-pressure rotors can provide similar availability improvement benefits. Another concept to improve availability includes the use of on-line monitoring and diagnostics. Rapid advances in electronics and microcomputers over the past decade have led to techniques for on-line analyses that were not considered possible a few years ago.

Bannister, R.L.; Bellows, J.C.; Osborne, R.L.

1983-07-01T23:59:59.000Z

403

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

404

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Broader source: Energy.gov (indexed) [DOE]

Construction of Distribution Lines, Service Lines, and Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) < Back Eligibility Commercial Installer/Contractor Institutional Investor-Owned Utility Low-Income Residential Multi-Family Residential Municipal/Public Utility Residential Rural Electric Cooperative Schools Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Home Weatherization Water Buying & Making Electricity Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any proposed construction of electricity-related facilities in residential

405

Gas turbine performance prognostic for condition-based maintenance  

Science Journals Connector (OSTI)

Gas turbine engines experience degradations over time that cause great concern to gas turbine users on engine reliability, availability and operating costs. Gas turbine diagnostics and prognostics is one of the key technologies to enable the move from time-scheduled maintenance to condition-based maintenance in order to improve engine reliability and availability and reduce life cycle costs. This paper describes a prognostic approach to estimate the remaining useful life of gas turbine engines before their next major overhaul based on historical health information. A combined regression techniques, including both linear and quadratic models, is proposed to predict the remaining useful life of gas turbine engines. A statistic “compatibility check” is used to determine the transition point from a linear regression to a quadratic regression. The developed prognostic approach has been applied to a model gas turbine engine similar to Rolls-Royce industrial gas turbine AVON 1535 implemented with compressor degradation over time. The analysis shows that the developed prognostic approach has a great potential to provide an estimation of engine remaining useful life before next major overhaul for gas turbine engines experiencing a typical soft degradation.

Y.G. Li; P. Nilkitsaranont

2009-01-01T23:59:59.000Z

406

Linac cryogenic distribution system maintenance and upgrades at JLab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, K.; Wright, M.; Ganni, V. [Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)

2014-01-29T23:59:59.000Z

407

Linac cryogenic distribution system maintenance and upgrades at Jlab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, Kelly D. [JLAB; Wright, Mathew C. [JLAB; Ganni, Venkatarao [JLAB

2014-01-01T23:59:59.000Z

408

DOE-STD-1041-93 CN-1; Guide to Good Practices for Shift Routines and Operating Practices  

Broader source: Energy.gov (indexed) [DOE]

1-93 1-93 June 1998 Change Notice No. 1 December 1998 DOE STANDARD GUIDE TO GOOD PRACTICES FOR SHIFT ROUTINES AND OPERATING PRACTICES U.S. Department of Energy AREA MISC Washington, D.C. 20585 DISTRIBUTION STATEMENT A:Approved for public release; distribution unlimited. This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. Change Notice No. 1 DOE-STD-1041-93 December 1998 Guide to Good Practices for Shift Routines and Operating Practices Page / Section Change

409

RFEDSCHK User's Manual (The RFEDS Lab Data Check routine), Environmental and Scientific Systems Information Resources: Version 1. 00  

SciTech Connect (OSTI)

The RFEDS Laboratory Data Check routine (RFEDSCHK) preforms checks of the off-site laboratory data to identify missing and/or incorrect data which may exist. The check routine is designed to assist the laboratories to correct deficiencies contained in the data before it is sent to the Rocky Flats Environmental Management Department, there-by improving the quality of the data being placed in RFEDS. If the data passes the checks with no errors, the data will be acceptable for placement into RFEDS and delivery of the electronic data to EG G is appropriate. If errors are detected, the laboratory should correct the errors and perform the check again until the data is free of errors.

Not Available

1992-05-01T23:59:59.000Z

410

Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR  

Broader source: Energy.gov (indexed) [DOE]

33.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE 33.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This module is divided into three sections. Section one contains the objective, general requirements, and the responsibilities assigned to field element managers. Section two includes the requirements in attachment 2 of the Order, Maintenance Management Program Requirements for DOE Nuclear Facilities. Section three is a summary of the guidance provided in DOE G 433.1-1, Facility Maintenance Management Program Guide for Use with DOE O 433.1.The

411

Joint Maintenance Status Report of Potomac Electric Power Company amd PJM  

Broader source: Energy.gov (indexed) [DOE]

Joint Maintenance Status Report of Potomac Electric Power Company Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC Docket No. EO-05-01: Potomac Electric Power Company ("Pepco") and PJM Interconnection, L.L.C. ("PJM") hereby jointly submit this Maintenance Report to advise you of the work completed and findings made during the maintenance outages for Pepco's two 230 kV circuits from the Palmers Comer to Potomac River substations pursuant to the December 20. 2006, Department of Energy ("DOE") Order No. 202-05-3. Joint Maintenance Status Report of Potomac Electric Power Company amd PJM Interconnection, LLC More Documents & Publications Special Environmental Analysis For Actions Taken under U.S. Department of

412

OpenEI maintenance March 8-9, 2013 | OpenEI Community  

Open Energy Info (EERE)

OpenEI maintenance March 8-9, 2013 OpenEI maintenance March 8-9, 2013 Home > Groups > Utility Rate Rmckeel's picture Submitted by Rmckeel(297) Contributor 8 March, 2013 - 14:23 developer Maintenance OpenEI We would like to inform the OpenEI community that OpenEI will be undergoing a significant software upgrade during a maintenance window this weekend. We will be upgrading the wiki and semantic mediawiki portions of OpenEI, which means /datasets, /apps, /lod, /sparql and /community will continue to function normally. Additionally, web services that rely on Ask queries (utility rate database API) may have some downtime as we transition. OpenEI will begin maintenance at 5pm MST Friday, March 8th, 2013. This means that the /wiki URLs will go into read-only mode and editing pages will not be possible. Maintenance is expected to end by 5pm MST Saturday,

413

Guideline to good practices for planning, scheduling, and coordination of maintenance at DOE nuclear facilities  

SciTech Connect (OSTI)

The purpose of the Guideline to Good Practices for Planning, Scheduling, and Coordination of Maintenance at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used for the development and implementation of a rigorously controlled maintenance program directed at planning, scheduling, and coordinating work packages for maintenance tasks at DOE nuclear facilities. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter II, Element 6. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing maintenance programs that are applicable to their facility.

Not Available

1993-03-01T23:59:59.000Z

414

A study on ally searching in maintenance alliance based on relation web model  

Science Journals Connector (OSTI)

Aiming at the risk aversion of adverse selection and efficiency improvement in maintenance ally searching, relation web and Mobile Agent are introduced into the study of maintenance ally searching. A maintenance ally searching method based on relation web model is proposed. First, the method decomposes complicated plant maintenance tasks, and then by setting up ally Searching Sub-Agent, the relation web model is mapped as properties, plans, behaviours and interactions of the Searching Sub-Agent. Based on the relation categories, shortest path, reliability and other definitions in relation to web model, a quantified evaluation method for acquaintance reliability and capability in maintenance alliance and ally searching strategy are designed. A solution for recommendation deadlock and dynamic management of Searching Sub-Agent is discussed. The ally searching system in maintenance alliance based on the above method is effectively applied in a plant overhaul of a partner petrochemical company.

Bai-Zhan Xia; Jian Liu; De-Jie Yu; An-Mei Zhou

2011-01-01T23:59:59.000Z

415

Text-Alternative Version: Maintenance Practices for LED Streetlights  

Broader source: Energy.gov [DOE]

Bruce Kinzey:So again, I want to welcome everyone to another MSSLC webinar. And we have a great one lined up today. At this point everyone is familiar with the fact that the solid-state street...

416

Operation and maintenance of Fermilab`s satellite refrigerator expansion engines  

SciTech Connect (OSTI)

Fermilab`s superconducting Tevatron accelerator is cooled to liquid helium temperatures by 24 satellite refrigerators, each of which uses for normal operations a reciprocating `wet` expansion engine. These expanders are basically Process System (formerly Koch) Model 1400 expanders installed in standalone cryostats designed by Fermilab. This paper will summarize recent experience with operations and maintenance of these expansion engines. Some of the statistics presented will include total engine hours, mean time between major and minor maintenance, and frequent causes of major maintenance.

Soyars, W.M.

1996-09-01T23:59:59.000Z

417

Utility Lines and Facilities (Montana)  

Broader source: Energy.gov [DOE]

These regulations apply to the construction of utility and power lines and facilities. They address the use of public right-of-ways for such construction, underground power lines, and construction...

418

Long-Term Surveillance - Operations and Maintenance (LTS-O&M) |  

Broader source: Energy.gov (indexed) [DOE]

Long-Term Surveillance - Operations and Maintenance Long-Term Surveillance - Operations and Maintenance (LTS-O&M) Long-Term Surveillance - Operations and Maintenance (LTS-O&M) Long-Term Surveillance – Operations and Maintenance (LTS-O&M) DOE established the Environmental Sciences Laboratory (ESL) in Grand Junction, Colorado, in 1991 to support its programs. ESL scientists perform applied research and laboratory-scale demonstrations of soil and groundwater remediation and treatment technologies. Capabilities Installation, monitoring, and operation of permeable reactive barriers Research of permeable reactive barriers and treatment cells Performance assessment and optimization of groundwater remediation systems Groundwater characterization Coupled hydrogeochemical modeling for groundwater remediation

419

Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues  

E-Print Network [OSTI]

challenges of modeling building maintenance issues usinguse, Building simulation, EnergyPlus, Fault modeling, HVACbuildings in various climates, and developing modeling

Wang, Liping

2014-01-01T23:59:59.000Z

420

Maintenance Awareness in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac J. Sreenan  

E-Print Network [OSTI]

Maintenance Awareness in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac J. Sreenan Mobile & Internet Systems Laboratory (MISL), University College Cork, Ireland Email: {a.barroso, u

Roedig, Utz

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Maintenance Efficient Routing in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac Sreenan  

E-Print Network [OSTI]

Maintenance Efficient Routing in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac Sreenan Mobile & Internet Systems Laboratory, University College Cork, Ireland Email: {a.barroso u

Sreenan, Cormac J.

422

Chapter 51 Attainment and Maintenance of the National Ambient Air Quality Standards (Kentucky)  

Broader source: Energy.gov [DOE]

Kentucky Administrative Regulation Chapter 51, entitled Attainment and Maintenance of the National Ambient Air Quality Standards, is promulgated under the authority of the Division of Air Quality...

423

Heat Flow Database Expansion for NGDS Data Development, Collection and Maintenance (SMU)  

Broader source: Energy.gov [DOE]

Heat Flow Database Expansion for NGDS Data Development, Collection and Maintenance (SMU) presentation at the April 2013 peer review meeting held in Denver, Colorado.

424

E-Print Network 3.0 - activity maintenance study Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

results for: activity maintenance study Page: << < 1 2 3 4 5 > >> 1 Innovative Contracting Strategies forInnovative Contracting Strategies for Transportation...

425

E-Print Network 3.0 - aircraft maintenance workers Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Mathematics 97 Rev. No.: 2.0 Contractor Environmental Safety and Health Manual Title: LockoutTagout Program Summary: worker performing the servicing or maintenance, is provided...

426

E-Print Network 3.0 - agreement maintenance based Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pave? Making Informed Decisions on When to Summary: A cost analysis based on spending history for low volume roads A method for estimating maintenance... in this study ...

427

Guideline to good practices for maintenance organization and administration at DOE nuclear facilities  

SciTech Connect (OSTI)

The purpose of the Guideline to Good Practices for Maintenance Organization and Administration at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used to verify adequacy of and/or modify existing maintenance organization programs, or to develop new programs. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter 2, Element 1. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing programs that are applicable to their facility.

Not Available

1993-03-01T23:59:59.000Z

428

Microalgae cultivation in PBRs: experimental measurement of maintenance energy requirement as a function of light energy.  

E-Print Network [OSTI]

??Most relevant factors influencing microalgal growth are light availability and utilization. The concept of maintenance energy is essential to understand the energy requirements for cell… (more)

Urbani, Silvia

2014-01-01T23:59:59.000Z

429

New Imperial Valley power line  

SciTech Connect (OSTI)

The Imperial Irrigation District placed its new 104-mile, 230kV transmission line in service in the Imperial Valley on September 14, 1988. The power line, with a rated capacity of 600 megawatts, transmits electricity generated at geothermal power plants. The transmission line was financed by 14 geothermal companies, whose participation was based on the amount of line-capacity they expect to use.

Not Available

1988-12-01T23:59:59.000Z

430

a 115-line MATLAB implementation  

E-Print Network [OSTI]

Apr 15, 2013 ... Alternating active-phase algorithm for multimaterial topology optimization problems -- a 115-line MATLAB implementation. Rouhollah Tavakoli ...

Rouhollah Tavakoli

2013-04-15T23:59:59.000Z

431

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

432

CORONAL EMISSION LINES AS THERMOMETERS  

SciTech Connect (OSTI)

Coronal emission-line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G., E-mail: judge@ucar.ed [High Altitude Observatory, National Center for Atmospheric Research , P.O. Box 3000, Boulder CO 80307-3000 (United States)

2010-01-10T23:59:59.000Z

433

Why Neutrino Lines are Hypersharp  

E-Print Network [OSTI]

It was recently pointed out that mono-energetic neutrino lines from the 2-body decay of tritium (tau ~ 18-y) can be emitted, a significant fraction, with natural line width (~10-24 eV) for hypersharp resonance transitions 3H--> line broadening in resonances of short lived (tau ~ microsec) states.

R. S. Raghavan

2009-08-20T23:59:59.000Z

434

Coronal emission lines as thermometers  

E-Print Network [OSTI]

Coronal emission line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G

2009-01-01T23:59:59.000Z

435

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

O&M Best Practices Guide, Release 3.0 3.1 O&M Best Practices Guide, Release 3.0 3.1 Chapter 3 O&M Management 3.1 Introduction O&M management is a critical component of the overall program. The management function should bind the distinct parts of the program into a cohesive entity. From our experience, the overall program should contain five very distinct functions making up the organization: Operations, Maintenance, Engineering, Training, and Administration-OMETA. Beyond establishing and facilitating the OMETA links, O&M managers have the responsibility of interfacing with other department managers and making their case for ever-shrinking budgets. Their roles also include project implementation functions as well as the need to maintain persistence of the

436

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

Chapter 1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective

437

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

9 O&M Ideas for Major Equipment Types 9 O&M Ideas for Major Equipment Types 9.1 Introduction At the heart of all O&M lies the equipment. Across the Federal sector, this equipment varies greatly in age, size, type, model, fuel used, condition, etc. While it is well beyond the scope of this guide to study all equipment types, we tried to focus our efforts on the more common types prevalent in the Federal sector. The objectives of this chapter are the following: * Present general equipment descriptions and operating principles for the major equipment types. * Discuss the key maintenance components of that equipment. * Highlight important safety issues. * Point out cost and energy efficiency issues. * Highlight any water-related efficiency impacts issues. * Provide recommended general O&M activities in the form of checklists.

438

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: Energy.gov (indexed) [DOE]

1 Introduction and Overview 1 Introduction and Overview The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industry experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not

439

Operations & Maintenance Best Practices Guide: Release 3.0  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

O&M Best Practices Guide, Release 3.0 3.1 O&M Best Practices Guide, Release 3.0 3.1 Chapter 3 O&M Management 3.1 Introduction O&M management is a critical component of the overall program. The management function should bind the distinct parts of the program into a cohesive entity. From our experience, the overall program should contain five very distinct functions making up the organization: Operations, Maintenance, Engineering, Training, and Administration-OMETA. Beyond establishing and facilitating the OMETA links, O&M managers have the responsibility of interfacing with other department managers and making their case for ever-shrinking budgets. Their roles also include project implementation functions as well as the need to maintain persistence of the

440

Microsoft Word - FINAL Contact Record 2012-01 Roads Maintenance  

Office of Legacy Management (LM)

RFLMA Contact Record 2012-01 page 1 of 6 RFLMA Contact Record 2012-01 page 1 of 6 ROCKY FLATS SITE REGULATORY CONTACT RECORD Purpose: Soil Disturbance Review Plan-Roads maintenance, including grading the road to the former A-3 Pond to convert the road to two-track vehicle use. Contact Record Approval Date: May 31, 2012 Site Contact(s)/Affiliation(s): Scott Surovchak, U.S. Department of Energy (DOE); Gwen Hooton, DOE; Rick DiSalvo, S.M. Stoller Corporation (Stoller); Kurt Franzen, Stoller; Linda Kaiser, Stoller Regulatory Contact(s)/Affiliation(s): Carl Spreng, Colorado Department of Public Health and Environment (CDPHE); Vera Moritz, U.S. Environmental Protection Agency (EPA) Date of Consultation Meeting: May 24, 2012 Consultation Meeting Participants: Carl Spreng, CDPHE; Scott Surovchak, DOE;

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Feasibility study for a transportation operations system cask maintenance facility  

SciTech Connect (OSTI)

The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

Rennich, M.J.; Medley, L.G.; Attaway, C.R.

1991-01-01T23:59:59.000Z

442

Maintenance personnel performance simulation (MAPPS) model: overview and evaluation efforts  

SciTech Connect (OSTI)

The development of the MAPPS model has been completed and the model is currently undergoing evaluation. These efforts are addressing a number of identified issues concerning practicality, acceptability, usefulness, and validity. Preliminary analysis of the evaluation data that has been collected indicates that MAPPS will provide comprehensive and reliable data for PRA purposes and for a number of other applications. The MAPPS computer simulation model provides the user with a sophisticated tool for gaining insights into tasks performed by NPP maintenance personnel. Its wide variety of input parameters and output data makes it extremely flexible for application to a number of diverse applications. With the demonstration of favorable model evaluation results, the MAPPS model will represent a valuable source of NPP maintainer reliability data and provide PRA studies with a source of data on maintainers that has previously not existed.

Knee, H.E.; Haas, P.M.; Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Ryan, T.G.

1984-01-01T23:59:59.000Z

443

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

CrystalllS-kV Transmission Line Routine Maintenance of CrystalllS-kV Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways Montrose County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-ways (ROW) along the Curecanti-Crystal (CCI-CRY) liS-kilovolt (kV) transmission line to safely access structures 112,1/6,4/1, 6IS-6, 7/1-9, and 8/1-4 (approximately 3 miles). The project is located on private and u.s. Bureau of Land Management (BLM) lands in Montrose County, Colorado. Routine maintenance actions proposed for CCI-CRY IIS-kV transmission line include the following: I) Access road grading and improvements. A rubber-tired motor grader andlor a track dozer would

444

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads Routine Maintenance of Hesperus-Montrose 345-kV Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). The project is located on private, U.S. Bureau of Land Management (BLM), and U.S. Forest Service (USFS) lands in San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado. Routine maintenance actions proposed for HSP-MTR 345-kV transmission line include the

445

CX-002671: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Vegetation Management - Routine Maintenance Along Captain Jack-Olinda Transmission Line CX(s) Applied: B1.13, B1.3 Date: 05202010 Location(s): California Office(s): Western...

446

U.S. Department of Energy Categorical Exclusion ...  

Broader source: Energy.gov (indexed) [DOE]

between the Site Domestic Water Loop and the suction line of the 784-A electric fire pumps. B1.3 - Routine maintenance Andrew R. Grainger Digitally signed by Andrew R. Grainger...

447

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to conduct routine maintenance on two existing structures along the Kayenta-Navajo 230-kV Transmission Line. The structures are located on either side of Shonto Wash approximately...

448

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hesperus-Montrose 345-kV Transmission Line Routine Maintenance of Right-of-Way Roads Ouray, Montrose, and San Miguel County, Colorado A. Brief Description of Proposal: Western Area...

449

Determination of self-absorption corrections by computation in routine gamma-ray spectrometry for typical environmental samples  

SciTech Connect (OSTI)

A simple and practical method has been developed to quickly calculate self-absorption corrections and mass attenuation coefficients, {mu}/p, in common environmental samples being analyzed by gamma-ray spectrometry. The method involves using a sample computer program and estimates of the elemental compositions of typical environmental samples. The use of this method eliminates the need for gamma-ray-transmission measurements of individual samples, as well as expensive and time consuming elemental analyses of routine samples. The calculated percent attenuation of the beam through various samples, as determined by this method, agrees very well with experimentally measured values of percent attenuation.

Oresegun, M.O. [Univ. of Ibadan (Nigeria); Decker, K.M.; Sanderson, C.G. [Environmental Measurements Lab., New York, NY (United States)

1993-12-31T23:59:59.000Z

450

Calibrating DOE-2 to Weather and Non-Weather-Dependent Loads for a Commercial Building: Data Processing Routines to Calibrate a DOE-2 Model, Volume II  

E-Print Network [OSTI]

ESL-TR-92-04/02 CALIBRATING DOE-2 TO WEATHER AND NON-WEATHER-DEPENDENT LOADS FOR A COMMERCIAL BUILDING, VOLUME 2: DATA PROCESSING ROUTINES TO CALIBRATE A DOE-2 MODEL Written by: John Douglas Bronson May 1992 (C) Copyright 1992 Texas Engineering... Plots 8 Temperature-Specific Humidity Carpet Plots 11 'PACKING' SITE MONITORED WEATHER DATA INTO TRY 16 APPENDIX A -- Data Processing Routines' Example Data Files and Routine Hard-copies 21 APPENDIX B -- Example Data Files and Progam Hard-copies to Pack...

Bronson, J. D.

1992-01-01T23:59:59.000Z

451

Long Astral Microtubules and RACK-1 Stabilize Polarity Domains during Maintenance Phase in Caenorhabditis  

E-Print Network [OSTI]

Long Astral Microtubules and RACK-1 Stabilize Polarity Domains during Maintenance Phase. In this study, we show that depletion of Caenorhabditis elegans RACK-1, which leads to short astral microtubules, Skop AR (2011) Long Astral Microtubules and RACK-1 Stabilize Polarity Domains during Maintenance Phase

Skop, Ahna

452

A Queue Theory-Based Approach to Staff Software Maintenance Centers G. Antoniol  

E-Print Network [OSTI]

A Queue Theory-Based Approach to Staff Software Maintenance Centers G. Antoniol , G. Casazza are changing the landscape of several different areas, ranging from infor- mation gathering/managing and commerce to software de- velopment, maintenance and evolution. Software compa- nies having a geographically

Di Penta, Massimiliano

453

Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant  

SciTech Connect (OSTI)

This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

Norm Stanley

2011-02-01T23:59:59.000Z

454

Maintenance policy performance assessment in presence of imprecision based on Dempster-Shafer Theory of Evidence  

Science Journals Connector (OSTI)

The aim of this work is to assess the performance of a maintenance policy when a stochastic model of the life of the component of interest is known, but relies on parameters that are imprecisely known, and only through information elicited from experts. ... Keywords: Dempster-Shafer Theory of Evidence (DSTE), Maintenance, Uncertainty

P. Baraldi; M. Compare; E. Zio

2013-10-01T23:59:59.000Z

455

A condition-based maintenance policy for a production system under excessive environmental degradation  

Science Journals Connector (OSTI)

In this paper a condition-based maintenance model is proposed for a single-unit system of production of goods and services. The system is subject to random deterioration which impacts not only the product quality but also the environment. We assume that ... Keywords: Condition-based maintenance policy, Nelder---Mead algorithm, Optimization, System degradation

H. Chouikhi; A. Khatab; N. Rezg

2014-08-01T23:59:59.000Z

456

Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th  

E-Print Network [OSTI]

Annual Steam System Maintenance Outage (2014) Beginning on Sunday, June 8th at 12:00pm (Noon), the Central Utility Plant (CUP), which supplies steam service to over 100 buildings on the Newark campus, will be shut down for the annual Steam System Maintenance Outage. This effort is necessary each year to ensure

Firestone, Jeremy

457

Home Maintenance and Repair Owning a home is a major responsibility.  

E-Print Network [OSTI]

Home Maintenance and Repair Owning a home is a major responsibility. Not only do you have the obligation of paying the mortgage each month, but you also have to maintain your home so that it remains a good investment. When talking about taking care of your home, most folks lump home maintenance

458

Somatic Sex Determination in D. melanogaster: Insights in the Establishment to Maintenance Transition  

E-Print Network [OSTI]

SOMATIC SEX DETERMINATION IN D. MELANOGASTER: INSIGHTS IN THE ESTABLISHMENT TO MAINTENANCE TRANSITION A Dissertation by ALEJANDRA NOEMI GONZALEZ ROJOS Submitted to the Office of Graduate Studies of Texas A&M University... in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY May 2012 Major Subject: Biology Somatic Sex Determination in D. melanogaster: Insights in the Establishment to Maintenance...

Gonzalez Rojos, Alejandra Noemi

2012-07-16T23:59:59.000Z

459

Evaluating maintenance policies by quantitative modeling and analysis Enrico Zio1,2,*  

E-Print Network [OSTI]

is the development of non-fossil-fuel energy production plants (nuclear, solar, wind, etc.), which is receiving Compare2 1 Chair on Systems Science and the Energetic challenge, European Foundation for New Energy) and the Predictive Maintenance (PrM). In practice, assessing whether these strategies really improve the maintenance

Boyer, Edmond

460

MAINTENANCE APPROACHES FOR ARIES-CS COMPACT STELLARATOR POWER CORE , S. Malang2  

E-Print Network [OSTI]

.R. Raffray1 and the ARIES Team 1 Center for Energy Research, 460 EBU-II, University of California-San Diego and maintenance ports have been conceptually defined. These are summarized in this paper. Blanket concepts of the coil system; (2) modular replacement approach through maintenance ports arranged between each pair

Raffray, A. René

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

2005 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

U.S. Energy Information Administration (EIA) Indexed Site

Page 1 Page 1 2012 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE Kerosene Line No. Sold directly to consumers for: 1 Residential Use (Non-Farm): * Backup generator * Home heating and cooking * Personal lawn equipment * EXCLUDE: Apartment buildings and Farmhouses 2 Commercial Use: * Apartment building * Bank * Casino * Church * College/School/Institution * Department/Retail store * Environmental clean-up service * Flushing fuel lines * Forestry service * Golf course * Government (Federal, State, local, and district; INCLUDE fuel used in vehicles) * Hazardous waste company * Hospital * Hotel/Motel * Landfill site government owned * Landscaping * Laundry company * Lumber yard that sells the lumber * Medical service * Port Authority/publicly owned port or loading dock

462

2013 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

waste company * Hospital * HotelMotel * Landfill site government owned (exclude private landfill, see Off-highway, as defined on page 3 for Lines 41 through 43) *...

463

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration  

SciTech Connect (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

464

THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES  

SciTech Connect (OSTI)

The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

Harris, S.; Gross, R.

2014-04-01T23:59:59.000Z

465

Guideline to good practices for control of maintenance activities at DOE nuclear facilities  

SciTech Connect (OSTI)

The purpose of the Guideline to Good Practices for Control of Maintenance Activities at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used for the development and implementation of a rigorously controlled maintenance program directed at achieving high quality work performance, personnel safety, radiological protection, operating equipment/system protection, and overall site safety and reliability at DOE nuclear facilities. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter II, Element 7. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing maintenance programs that are applicable to their facility.

Not Available

1993-03-01T23:59:59.000Z

466

Definition: Reduced T&D Equipment Maintenance Cost | Open Energy  

Open Energy Info (EERE)

T&D Equipment Maintenance Cost T&D Equipment Maintenance Cost Jump to: navigation, search Dictionary.png Reduced T&D Equipment Maintenance Cost The cost of sending technicians into the field to check equipment condition is high. Moreover, to ensure that they maintain equipment sufficiently, and identify failure precursors, some utilities may conduct equipment testing and maintenance more often than is necessary. Online diagnosis and reporting of equipment condition would reduce or eliminate the need to send people out to check equipment resulting in a cost savings.[1] References ↑ SmartGrid.gov 'Description of Benefits' An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reduced_T%26D_Equipment_Maintenance_Cost&oldid=417296"

467

Bipolar pulse forming line  

DOE Patents [OSTI]

A bipolar pulse forming transmission line module for linear induction accelerators having first, second, third, fourth, and fifth planar conductors which form an interleaved stack with dielectric layers between the conductors. Each conductor has a first end, and a second end adjacent an acceleration axis. The first and second planar conductors are connected to each other at the second ends, the fourth and fifth planar conductors are connected to each other at the second ends, and the first and fifth planar conductors are connected to each other at the first ends via a shorting plate adjacent the first ends. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short a high voltage from the first end of the third planar conductor to the first end of the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

Rhodes, Mark A. (Pleasanton, CA)

2008-10-21T23:59:59.000Z

468

Analysis of interconnect microstrip lines  

E-Print Network [OSTI]

System C. Dyadic Green's Functions 1. TM and TE Decomposition 2. Transmission-Line Green's Functions . NUiVIERICAL PROCEDURES . A. Basis functions and testing procedure . 1. Interconnect of Microstrip Lines 2. Slot-Coupled Microstrip Dipole . 3... data of return loss on the 20 GHz slot-coupled rect- angular patch antenna. . FIG URE Pa. ge 28 Typical transmission line section containing a 1A current source. . . 68 CHAPTER I INTRODUCTION Many studies on slot-coupled microstrip antennas have...

Luong, Giam-Minh

2012-06-07T23:59:59.000Z

469

Performance of Matrix-Assisted Laser Desorption Ionization-Time of Flight Mass Spectrometry for Identification of Bacterial Strains Routinely Isolated in a Clinical Microbiology Laboratory  

Science Journals Connector (OSTI)

...Routinely Isolated in a Clinical Microbiology Laboratory Published ahead...Mailing address: Institute of Microbiology, University of Lausanne...E-mail for G. Greub: gilbert.greubchuv.ch . E-mail...G. Prodhom Institute of Microbiology, University of Lausanne...

A. Bizzini; C. Durussel; J. Bille; G. Greub; G. Prod'hom

2010-03-10T23:59:59.000Z

470

Matrix-Assisted Laser Desorption Ionization–Time of Flight Mass Spectrometry: a Fundamental Shift in the Routine Practice of Clinical Microbiology  

Science Journals Connector (OSTI)

...Desorption Ionization-Time of Flight Mass Spectrometry: a Fundamental Shift in the Routine Practice of Clinical Microbiology Andrew...ability to absorb specific laser wavelengths, resulting in electronic excitation of the matrix. A list of matrices commonly used...

Andrew E. Clark; Erin J. Kaleta; Amit Arora; Donna M. Wolk

2013-07-01T23:59:59.000Z

471

Testing in Software Product Lines.  

E-Print Network [OSTI]

??This thesis presents research aimed at investigating different activities involved in software product lines testing process and possible improvements towards achieving developing high quality software… (more)

Odia, Osaretin

2007-01-01T23:59:59.000Z

472

NETL LINES OF DEMARCATION 09282012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LINES OF DEMARCATION September 28, 2012 Contact: Site Operations Division or ESS&H Division with Questions The oversight, upkeep, and segregation of NETL infrastructure components,...

473

Brine clarity maintenance in salinity-gradient solar ponds  

Science Journals Connector (OSTI)

Brine transparency is an important part of the maintenance of a salinity-gradient solar pond as it affects the amount of solar radiation reaching the storage zone and hence has an influence on the thermal performance. There is a wide range of factors that can hinder the transmission of light in a solar pond. Algal and microbial growths are the most common problems encountered in working solar ponds and control of their densities is essential to maintain transparency. Two different chemical treatment methods for algae growth prevention are described in this paper: chlorine and a novel chemical product – copper ethylamine complex. The latter method has never been implemented previously in a working pond. This paper discusses the theory of the algae control methods used and presents the experimental results of the chemical treatments. The results showed that Cupricide is more effective than chlorine and is therefore the recommended chemical for algae control in solar ponds; it improves the water transparency especially in the upper convective zone and lower convective zone with all measurement values less than 1 NTU. Chlorine was found to be more corrosive than Cupricide due to the acidic effect it has on the pH. The preliminary cost analysis showed that granular chlorine is the cheapest chemical. A more detailed financial analysis is nevertheless required to refine these costs.

Neus Gasulla; Yusli Yaakob; Jimmy Leblanc; Aliakbar Akbarzadeh; Jose Luis Cortina

2011-01-01T23:59:59.000Z

474

EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company  

Broader source: Energy.gov [DOE]

The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

475

Indirect selection for plasmid mutants: isolation of ColVBtrp mutants defective in self-maintenance in Escherichia coli.  

Science Journals Connector (OSTI)

...isolation of ColVBtrp mutants defective in self-maintenance in Escherichia...fact, many of the mutants defective in plasmid maintenance were...characterization of strains car- rying mutated plasmids defective in self-main- tenance has...

A H Koyama; C Wada; T Nagata; T Yura

1975-04-01T23:59:59.000Z

476

Age group and individual differences in attentional orienting dissociate neural mechanisms of encoding and maintenance in visual stm  

Science Journals Connector (OSTI)

Selective attention biases the encoding and maintenance of representations in visual STM VSTM. However, precise attentional mechanisms gating encoding and maintenance in VSTM and across development remain less well understood. We recorded EEG while adults ...

Andria Shimi; Bo-Cheng Kuo; Duncan E. Astle; Anna C. Nobre; Gaia Scerif

2014-04-01T23:59:59.000Z

477

Productivity Improvement of a Manual Assembly Line  

E-Print Network [OSTI]

or re-configuring an assembly system, which is the key step in improving the overall performance of an assembly line. Following this approach, two manual assembly line configurations (single stage parallel line and five-stage serial line...

Yerasi, Pranavi

2012-10-19T23:59:59.000Z

478

Steam turbine maintenance and repair technology: Reducing planned-outage costs  

SciTech Connect (OSTI)

The North American Electric Reliability Council (NAERC) reported that the average loss of equivalent availability per outage for a major fossil turbine overhaul is 323,000 MW-HR. The Electric Power Research Institute (EPRI) Generation and Storage Division, is in the first phase of a major research project to reduce the duration and/or frequency of steam turbine maintenance outages. This project consists of an assessment of the current state-of-the-art turbine maintenance and repair techniques and technologies. It is based on a review of current turbine maintenance practices of the US, European, Japanese, and Australian utility industries. Emphasized are maintenance and repair activities that have the most significant impact on outage duration or frequency. Twenty-six key turbine maintenance activities and the current best techniques were identified for use by utility maintenance personnel. Overall outage durations could be reduced if the duration of these activities were shortened or if they were performed more effectively. Recommended projects for development of advanced steam turbine maintenance technology were identified. 29 refs., 46 figs., 9 tabs.

Grace, H.P.; McClintock, M. (General Physics Corp., Columbia, MD (USA)); Lamping, G. (Southwest Research Inst., San Antonio, TX (USA))

1990-04-01T23:59:59.000Z

479

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems  

E-Print Network [OSTI]

Proposal for the Award of a Contract for Maintenance, Operation and Minor Installation Work for CERN Cooling and HVAC Systems

1996-01-01T23:59:59.000Z

480

SunLine Transit Agency  

Broader source: Energy.gov [DOE]

SunLine Transit Agency provides public transit and community services to California's Coachella Valley. The service area is more than 1,100 square miles and includes nine member cities, as well as Riverside County. Over the years, SunLine has pursued an aggressive strategy for implementing clean technologies into its fleet.

Note: This page contains sample records for the topic "line routine maintenance" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freight pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedes  

E-Print Network [OSTI]

and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operat and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operations pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian

482

Optimal threshold-based network-level transportation infrastructure life-cycle management with heterogeneous maintenance actions  

Science Journals Connector (OSTI)

Transportation infrastructure life-cycle management deals with maintenance decision making of transportation facilities such as pavement, bridges, and railways under budget constraints. In practice, transportation agencies adopt threshold-based rules for maintenance planning because they are intuitive and easy to implement. However, the thresholds are often determined based on engineering judgment without any systematic approach. Therefore, maintenance budgets cannot be used effectively and facility conditions are not optimized. This research uses hybrid dynamic models to represent threshold-based maintenance for transportation infrastructure in a realistic manner. Hybrid dynamic models combine continuous states such as pavement roughness and age with discrete states such as maintenance history. These models are also capable of considering multiple maintenance actions with heterogeneous effects. Based on facility conditions and maintenance thresholds, corresponding maintenance actions are selected automatically and the facility switches between deterioration modes to reflect the effects of the chosen action. Furthermore, to consider users’ reactions to maintenance actions and accurately predict deterioration for a network of facilities, threshold-based maintenance is formulated as an upper-level problem, and user response is incorporated as a lower-level problem. This leads to a bi-level programming problem where maintenance thresholds are decision variables, which is solved with a modified tabu search algorithm. The proposed methodology is validated with the road network of an urban area and the generated maintenance thresholds are reasonable and robust, which shows that the methodology has great potential to support transportation infrastructure life-cycle management in practice.

James C. Chu; Yin-Jay Chen

2012-01-01T23:59:59.000Z

483

2003 Long-Term Surveillance and Maintenance Program Report  

SciTech Connect (OSTI)

Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

None

2004-07-01T23:59:59.000Z

484

Human Factors/Ergonomics Handbook for the Design for Ease of Maintenance  

Broader source: Energy.gov (indexed) [DOE]

7 2.0 DESIGN FOR MAINTAINABILITY This section contains human factors guidance for designing systems, subsystems, equipment and facilities so that maintenance is easy and cost effective. 2.1 Unitization, modularization, and standardization Unitization refers to separating equipment into physically and functionally distinct units to allow for easy removal and replacement. This type of equipment separation will permit division of maintenance responsibility, especially troubleshooting, among various maintenance levels. Modularization refers to unitized equipment in which the functional units making up a module are integrated and are removed or inserted as a unit. 2.1.1 Goals of unitization/modularization. Unit design/modularization of equipment should

485

Decision Support Tool for Prioritization of Resources Dedicated to Surveillance and Maintenance Activities  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory Florida International University Tennessee Florida Decision Support Tool for Prioritization of Resources Dedicated to Surveillance and Maintenance Activities Challenge The Department of Energy (DOE) currently faces a difficult task in the disposition of excess facilities. Many of these facilities are large and complex and contain potentially hazardous substances. Operational experience shows that once buildings have been declared excess and are transferred to surveillance and maintenance (S&M), maintenance budgets are reduced since the planned demolition of the building is used as a justification for not spending money to make repairs on it. One need identified at the Oak Ridge National Laboratory (ORNL), and

486

Maintenance and repair expenditures: determinants and tradeoffs with new capital goods  

Science Journals Connector (OSTI)

Traditionally economic analysis has focused on new capital investment, while ignoring expenditures to maintain or repair existing stock. Recent, broader theories of replacement have emphasized the important role played by both maintenance and utilization rates. However, the decision to extend the service life of capital has been given scant empirical attention, owing partly to a lack of appropriate data. This study exploits survey data that report annual maintenance/repair expenditures for Canadian manufacturing industries. A standard production framework, modified to incorporate endogenous depreciation, guides the econometric analysis. The empirical results indicate that the cost of capital, among other variables, has a statistically significant effect on maintenance/repair decisions.

J.K. Mullen; Martin Williams

2004-01-01T23:59:59.000Z

487

Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance  

SciTech Connect (OSTI)

This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

Bourgeois, N.C.; Greer, D.K.

1993-04-01T23:59:59.000Z

488

Site transition framework for long-term surveillance and maintenance  

SciTech Connect (OSTI)

This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a site’s transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.

none,

2014-04-01T23:59:59.000Z

489

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

490

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

491

Resonance Broadening of Spectral Lines  

Science Journals Connector (OSTI)

A formalism introduced previously by the author is used to calculate the shape of an absorption line in a gas, taking account of the "resonance" interaction between like atoms. The most serious approximation is the neglect of the effect of translational motion. An asymmetric line is obtained, with the maximum shifted slightly toward the red. Some simple classical considerations also agree qualitatively with the results. Various properties of the line shape obtained are briefly discussed. The neglect of translational motion makes it impossible to compare the results with experiments performed up to the present time.

C. Alden Mead

1960-11-01T23:59:59.000Z

492

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

493

Human Factors/Ergonomics Handbook for the Design for the Ease of Maintenance  

Broader source: Energy.gov (indexed) [DOE]

113 3.0 WORKSPACE, STORAGE, AND WORKSHOP DESIGN 3.1 Workspace and operations in non-workshop areas 3.1.1 Workspace 3.1.1.1 General Maintenance clearance. To provide adequate clearance for maintainers and to provide sufficient space to accommodate tools, test equipment, procedures, and other job aids during an in-place repair, a nominal 914 mm (36 in.) maintenance clearance should be provided around all major system components and piping of 610 mm (24 in.) diameter and larger. 3.1.1.1 Console floor space. Whenever feasible, free floor space of at least 1.22 m (48 in.) should be provided in front of consoles used by maintenance personnel. For equipment racks that require maintenance, free floor space should be provided in accordance with the criteria given below.

494

UrbanSolutionsCenter Landscape Maintenance Practices Influence Fire Ant Establishment  

E-Print Network [OSTI]

UrbanSolutionsCenter Landscape Maintenance Practices Influence Fire Ant Establishment Background one of our most economically important pests in urban landscapes. Fire Ants cause extensive mounding are often necessary in urban landscapes around residential and commercial buildings, in parks

495

Effect of solvent debinding variables on the shape maintenance of green molded bodies  

Science Journals Connector (OSTI)

In order to study the effect of solvent extraction debinding variables on the shape maintenance of green molded bodies, powder compression molded bodies (the feed) were debound in various organic solvents such as...

M. T. Zaky

496

E-Print Network 3.0 - acid-base balance maintenance Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(3) 298... .50 Microsoft Server Maintenance 343.70 Vendprint annual license 599.00 Sketchup license 1,800.00 Web utility Source: Iowa State University, Office of Biorenewables...

497

Design of multifunctional paired robots engaged across a thin plate for aircraft manufacturing and maintenance  

E-Print Network [OSTI]

The aircraft industry lacks an automated system for wing box manufacturing and maintenance. Currently workers assemble and inspect thousands of fasteners in the wing structure by hand. This manufacturing process consumes ...

Karasic, Geoffrey Ian

2011-01-01T23:59:59.000Z

498

Web-based feedback system: the life cycle management as continuous maintenance of apartment facility information  

E-Print Network [OSTI]

This research investigates the feasibility of web technology as a means of delivering facility information for better support of facility operations and maintenance. This study proposes a web-based feedback system as a pragmatic solution...

Jeong, Jin Su

2006-10-30T23:59:59.000Z

499

Methods for Identifying Best-Value Bid for Performance-based Maintenance Contracts  

E-Print Network [OSTI]

Performance-based contracting (PBC) for roadway maintenance is relatively new among various alternative contracting options available at present and is increasingly drawing more attention from state Departments of Transportation (DOTs...

Ahmed, Jubair

2011-02-22T23:59:59.000Z

500

FMEA (Failure Mode Effect Analysis) for Maintenance of Mail Sorting Machine  

Science Journals Connector (OSTI)

This paper describes the diagnosis item and cycle update for maintenance of mail sorting machine based on FMEA (Failure Mode Effect Analysis). We show the FMEA deployment step, result, and statistics analysis...

Jeong-Hyun Park; Hoyon Kim; Jong-Heung Park

2009-01-01T23:59:59.000Z