National Library of Energy BETA

Sample records for line routine maintenance

  1. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  2. Designing an on-line multimedia maintenance manual for a production environment

    E-Print Network [OSTI]

    Brinkman, Willem-Paul

    - would better express the complex spatial and dynamic operations on hardware. Finally, maintenance36 Designing an on-line multimedia maintenance manual for a production environment W.P. Brinkman, V.P. Buil, R. Cullen1 , R. Gobits2 and F.L. van Nes e-mail: w.p.brinkman@tue.nl Abstract Maintenance

  3. On-line maintenance methodology development and its applications

    SciTech Connect (OSTI)

    Kim, J.; Jae, M.

    2012-07-01

    With the increasing economic pressures being faced and the potential for shortening outage times under the conditions of deregulated electricity markets in the world, licensees are motivated to get an increasing amount of the on-line maintenance (OLM). The benefits of the OLM includes increased system and plant reliability, reduction of plant equipment and system material condition deficiencies that could adversely impact operations, and reduction of work scope during plant refueling outages. In Korea, allowance guidelines of risk assessment is specified in the safety regulation guidelines 16.7 and 16.8 of the Korea Inst. of Nuclear Safety (KINS), which is 'General guidelines of Risk-informed application for requesting permission of changes' and 'Requesting permission of changes of Risk-informed application for Technical Specification'. We select the emergency diesel generator (EDG) of the Ulchin unit 3 and 4 for risk assessment analysis by applying configuration changes. The EDG which has plant safety level IE belongs to on-site standby power (A, B train EDG) in electric distribution system. The EDG is important component because it should maintain standby status during plant is operating, therefore we select the EDG for target component of risk assessment analysis. The risk assessment is limited to CDF. The risk assessment is performed by using AIMS-PSA Release2. We evaluate CDF by applying the configuration changes with some assumptions. Evaluation of the full power operation and Low power/Shut down operation was performed. This study has been performed for introducing a methodology and performing risk assessment. (authors)

  4. Second Line of Defense Help Desk: Electronic Maintenance Reports - Local Maintenance Provider User Guide Rev. 1

    SciTech Connect (OSTI)

    Leigh, Richard J.

    2011-12-14

    The Electronic Maintenance Report forms present a uniform dataset for analysis of Sustainability metrics. These forms collect readily minable data while allowing the attachment of site-specific checklists or other supporting files for review by the Sustainability Manager and Program Management.

  5. EA-1982: Parker-Davis Transmission System Routine Operation and...

    Energy Savers [EERE]

    Parker-Davis Transmission System Routine Operation and Maintenance Project and Proposed Integrated Vegetation Management Program EA-1982: Parker-Davis Transmission System Routine...

  6. Web Maintenance

    Broader source: Energy.gov [DOE]

    EERE expects its offices to review and maintain their online content on an ongoing basis throughout the year. This includes two kinds of maintenance: technical maintenance and content maintenance....

  7. Maintenance Types

    Broader source: Energy.gov [DOE]

    Proper operations and maintenance (O&M) goes beyond repairing equipment after it breaks. Several maintenance strategies exist to prevent systems disrepair and degradation. A combination of the...

  8. Reactive Maintenance

    Broader source: Energy.gov [DOE]

    Reactive maintenance follows a run-it-until-it-breaks strategy where no actions or efforts are taken to maintain equipment as intended by the manufacturer. Studies indicate this is still the predominant mode of maintenance for Federal facilities.

  9. Maintenance Guide for Microirrigation Systems in the

    E-Print Network [OSTI]

    Maintenance Guide for Microirrigation Systems in the Southern Region By The Irrigation Water Region Table of Contents 1. Introduction 2. Testing the irrigation water source 3. Routine maintenance of system components 3.1. Pumps 3.2. Power units 3.3. Water filters 3.4. Chemical injection equipment 3

  10. An automated neutron monitor maintenance system

    SciTech Connect (OSTI)

    Moore, F.S.; Griffin, J.C.; Odell, D.M.C.

    1996-09-01

    Neutron detectors are commonly used by the nuclear materials processing industry to monitor fissile materials in process vessels and tanks. The proper functioning of these neutron monitors must be periodically evaluated. We have developed and placed in routine use a PC-based multichannel analyzer (MCA) system for on-line BF3 and He-3 gas-filled detector function testing. The automated system: 1) acquires spectral data from the monitor system, 2) analyzes the spectrum to determine the detector`s functionality, 3) makes suggestions for maintenance or repair, as required, and 4) saves the spectrum and results to disk for review. The operator interface has been designed to be user-friendly and to minimize the training requirements of the user. The system may also be easily customized for various applications

  11. Predictive Maintenance

    Broader source: Energy.gov [DOE]

    Predictive maintenance aims to detect equipment degradation and address problems as they arise. The result indicates potential issues, which are controlled or eliminated prior to any significant system deterioration.

  12. Appendix E Instrumentation time lines This appendix contains timelines of instrument and equipment installation periods and where appropriate, system maintenance information is

    E-Print Network [OSTI]

    , an ID of the instrument installed is given above the line designating the period of installation 6. Profile tower CO2/H2O logger 7. Power system control logger 537 #12;Time Line Date 5/12/20015/12 . . Cell T volt divider . 0 .. . ... Main ... low er upper . . . Sw itched . S 762 ...... 83 . 470

  13. EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah

    Broader source: Energy.gov [DOE]

    This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

  14. Predictive Maintenance Technologies

    Broader source: Energy.gov [DOE]

    Several diagnostic technologies and best practices are available to assist Federal agencies with predictive maintenance programs.

  15. Wrapper Maintenance Kristina Lerman

    E-Print Network [OSTI]

    Lerman, Kristina

    . If statistically significant changes are found, the verification system notifies the operator that the wrapperWrapper Maintenance Kristina Lerman University of Southern California Information Sciences can break the wrapper and prevent it from extracting data correctly. Wrapper maintenance

  16. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    SciTech Connect (OSTI)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  17. UNIVERSITY OF FLORIDA MAINTENANCE

    E-Print Network [OSTI]

    Sin, Peter

    UNIVERSITY OF FLORIDA ASBESTOS OPERATIONS AND MAINTENANCE PLAN Administered by: Environmental of Florida ­ Asbestos Operations and Maintenance 2 Introduction The following document contains the University of Floridas Asbestos Operations and Maintenance (O&M) plan. The primary objective of this plan

  18. MAINTENANCE MANAGEMENT PROFESSIONAL (MMP)

    E-Print Network [OSTI]

    Saskatchewan, University of

    MAINTENANCE MANAGEMENT PROFESSIONAL (MMP) CERTIFICATE PROGRAM & Distance Education Ron and Jane for Continuing & Distance Education Module 1--Maintenance Management Skills and Techniques latest developments and trendsModule 1 introduces the basic concepts of physical asset management and the in effective

  19. Routine Radiological Environmental Monitoring Plan. Volume 1

    SciTech Connect (OSTI)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  20. The characterization of a vision-based navigation system for spacecraft proximity operations and on-orbit maintenance 

    E-Print Network [OSTI]

    Effinger, Robert T

    2013-02-22

    To transport humans into space routinely and safely a spacecraft must be capable of proximity operations (maneuvers close to other spacecraft), and on-orbit maintenance. These operations require an intelligent system that identifies and informs...

  1. Increasing Child Compliance with Essential Healthcare Routines: Acquisition, Maintenance, and Generalization

    E-Print Network [OSTI]

    Harrison, Kelley Lynne Attix

    2014-08-31

    and willingness to split a cheese dip and eat Mexican (even if we just had it last night)! vi Thank you to Joe Dracobly for your constant advice on everything from writing, to research, to clinical cases and, of course, for all of your technology support... was diagnosed with Kawasaki Disease. Survey instrument and procedure. A survey on problem behavior (i.e., noncompliance, crying, elopement, screaming, hitting, grabbing, pinching, scratching, stereotypy, property destruction, throwing materials, negative...

  2. EA-1982: Parker-Davis Transmission System Routine Operation and Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:FinancingPetroleum Based|Department of Energy 8:Final78: Sand Creek Winds,

  3. Operations and Maintenance Program Structure

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

  4. CRAD, NNSA- Maintenance (MN)

    Broader source: Energy.gov [DOE]

    CRAD for Maintenance (MN). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  5. Lawn Maintenance Safety 

    E-Print Network [OSTI]

    Smith, David

    2005-07-12

    Most homeowners do not consider lawn maintenance to be dangerous. However lawn mowers, trimmers, edgers and other power equipment can cause minor to severe burns and lacerations, broken and dislocated bones, eye injuries and loss of fingers, toes...

  6. PORTFOLIO OF POTENTIAL STRATEGIES IN AERONAUTIC MAINTENANCE

    SciTech Connect (OSTI)

    Rolet, S. [Structural Health Engineering department, EADS Innovation Works, Toulouse (France)

    2010-02-22

    EADS divisions aim more and more at developing services associated to their platforms. EADS divisions, like Airbus and Eurocopter, are investigating on services associated to their platforms in order to add them value. One possible service consists in structural maintenance operation assistance, especially for NDT operations performed by the customer. EADS Innovation Works envisages three different and complementary enhanced structural maintenance categories. Enhanced NDT improves standard NDT operation environment. This is made possible by the existence of 'smart' NDT tools that are computer based and therefore able to support other functions. These functions range from local smart data processing and display to remote expert assisted operation. Passive Sensor Network relies on sensors permanently installed on aircraft structure. Interrogation of sensors is performed on ground and off line (while structure is not loaded except by its own weight). It can be done at arbitrary times in order to determine structure health. The aim is to give easy access to some hidden ''hot spots,'' to reduce human factor in structure health assessment and optimize maintenance. Structural Health Monitoring goes a step beyond Passive Sensor Network, because interrogation units are on board the aircraft and may be connected to aircraft network. It allows to use on-line techniques such as adapted acoustic emission and to automatically raise an alarm when a defect appears in the structure. This paper presents these different ways of improving structural maintenance operations in service, with their respective advantages and limitations.

  7. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  8. Improving cogeneration plant performance through effective maintenance strategies

    SciTech Connect (OSTI)

    Sheikh, S.M.

    1998-12-31

    Gas-fired cogeneration plants supplying power and thermal energy make up an increasing percentage of new fossil generation capacity additions, both in the US and overseas. These plants are popular, not only because they cost less to build, but also because they are highly efficient and their operation and maintenance costs are lower than plants using the traditional coal-based Rankine cycle. One of the methods being used to contain the initial cost of building cogeneration plants is to minimize redundancy both in the quantity of spare equipment specified for the various systems in the plants and in the design capacity of individual components. The overall effect of such a strategy may lead to reduced reliability and availability of the cogeneration plant in the long term. Operating cogeneration plants present a variety of technologies, equipment, and operating practices. While newer cogeneration plants routinely operate at a reliability of 90% or higher, older plants may not be able to achieve such performance due to excessive equipment breakdowns or inadequate maintenance strategies. By not having the appropriate maintenance programs in place, even newer cogeneration plants are vulnerable to deteriorating reliability and availability in the long term. This paper describes mechanisms for directing maintenance resources toward reducing current maintenance costs while maintaining high availability without sacrificing long-term reliability. The maintenance strategies discussed are those that can provide the maximum benefits for improving cogeneration plant reliability, availability, capacity, cost control, and safety.

  9. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities...

  10. Electrician - Foreman II (Transmission Lines & Substations) ...

    Broader source: Energy.gov (indexed) [DOE]

    Region Transmission Lines and Substation Maintenance (G5200) 615 S. 43rd Avenue Phoenix, AZ 85009 Duty Location is Page, AZ Find out more about living conditions at this...

  11. Risk-based maintenance modeling. Prioritization of maintenance importances and quantification of maintenance effectiveness

    SciTech Connect (OSTI)

    Vesely, W.E.; Rezos, J.T.

    1995-09-01

    This report describes methods for prioritizing the risk importances of maintenances using a Probabilistic Risk Assessment (PRA). Approaches then are described for quantifying their reliability and risk effects. Two different PRA importance measures, minimal cutset importances and risk reduction importances, were used to prioritize maintenances; the findings show that both give similar results if appropriate criteria are used. The justifications for the particular importance measures also are developed. The methods developed to quantify the reliability and risk effects of maintenance actions are extensions of the usual reliability models now used in PRAs. These extended models consider degraded states of the component, and quantify the benefits of maintenance in correcting degradations and preventing failures. The negative effects of maintenance, including downtimes, also are included. These models are specific types of Markov models. The data for these models can be obtained from plant maintenance logs and from the Nuclear Plant Reliability Data System (NPRDS). To explore the potential usefulness of these models, the authors analyzed a range of postulated values of input data. These models were used to examine maintenance effects on a components reliability and performance for various maintenance programs and component data. Maintenance schedules were analyzed to optimize the component`s availability. In specific cases, the effects of maintenance were found to be large.

  12. Maintenance Types | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    requirements of any physical asset within its operating context. Chapter 5 of the Federal Energy Management Program's O&M Best Practices Guide outlines these maintenance types in...

  13. Sustainability of green space maintenance

    E-Print Network [OSTI]

    Nomura, Wataru

    2011-01-01

    In Japan, recent changes in socio-economic and political structures -- decreasing tax revenue, declining communication among community members, and privatization of public services-- have influenced existing maintenance ...

  14. CRAD, Maintenance- Los Alamos National Laboratory TA 55 SST Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance program at the Los Alamos National Laboratory TA 55 SST Facility.

  15. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  16. CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

  17. Turfgrass: Maintenance Costs in Texas. 

    E-Print Network [OSTI]

    Holt, Ethan C.; Allen, W. Wayne; Ferguson, Marvin H.

    1964-01-01

    LAW FOR VARIOUS M-AINTENANCE ITEMS BASED ON O\\!'\\'S. ERSHIP AND TYPE OF GRASS WITHIN EACH REGION Maintenance items TY PC Percent Lot size, Region of oz;r- of lawns square Com~osty Fertilizer Chemicals Water Average grass in region feet cost cost...

  18. Awarded Products Maintenance, Repair & Operations TOOLS & HARDWARE

    E-Print Network [OSTI]

    California at San Diego, University of

    Awarded Products Maintenance, Repair & Operations (MRO): TOOLS & HARDWARE Such as hand and power tools, cutting tools, fasteners, etc. Maintenance, Repair & Operations (MRO): TOOLS & HARDWARE Such as hand and power tools, cutting tools, fasteners, etc. Maintenance, Repair & Operations (MRO): TOOLS

  19. MAINTENANCE (Purchasing Department) CONSTRUCTION (Design & Construction Services Department)

    E-Print Network [OSTI]

    MAINTENANCE (Purchasing Department) vs. CONSTRUCTION (Design & Construction Services Department NO NO Maintenance or Construction Decision Tree Maintenance : Maintenance is the upkeep of property , machinery

  20. 2. Space Inventory and Deferred Maintenance ii. Deferred Maintenance

    E-Print Network [OSTI]

    Zandstra, Peter W.

    a five-year program to assess university facilities using consistent software, cost models and common for deferred maintenance has been the Provincial Government through the Facilities Renewal Program (FRP

  1. Electrical transmission line diametrical retainer

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  2. Sandia Energy - Test Site Operations & Maintenance Safety

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Test Site Operations & Maintenance Safety Home Stationary Power Energy Conversion Efficiency Wind Energy SWiFT Facility & Testing Test Site Operations & Maintenance Safety Test...

  3. Computerized Maintenance Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Systems Computerized maintenance management systems (CMMS) are a type of management software that perform functions in support of operations and maintenance (O&M) programs. The...

  4. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  5. Maintenance Practices for LED Streetlights

    Broader source: Energy.gov [DOE]

    This April 14, 2014 webinar answered important questions about the maintenance and reliability of LED streetlights, and how to take these issues into account when planning and preparing for a...

  6. USF PHYSICAL PLANT VEHICLE MAINTENANCE

    E-Print Network [OSTI]

    Meyers, Steven D.

    USF PHYSICAL PLANT VEHICLE MAINTENANCE TELEPHONE NO. 974-2500 GAS PUMP AUTHORIZATION FORM PLEASE. _____ THE FOLLOWING PERSONNEL ARE AUTHORIZED BY THIS DOCUMENT TO PUMP GASOLINE/DIESEL FUEL FOR OUR USF OWNED VEHICLES

  7. Routine environmental audit of the K-25 Site, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report documents the results of the Routine Environmental Audit of the K-25 Site in Oak Ridge, Tennessee, conducted February 14 through February 25, 1994, by the US Department of Energy`s (DOE`s) Office of Environmental Audit (EH-24) located within the Office of Environment, Safety and Health (EH). The Routine Environmental Audit for the K-25 site was conducted as an environmental management assessment, supported through reviews of the Waste Management Program and the Decontamination and Decommissioning Program. The assessment was conducted jointly with, and built upon, the results provided by the ``DOE Oak Ridge Operations Office Environment, Safety, health and Quality Assurance Appraisal at the K-25 Site.`` DOE 5482.1B, ``Environment, Safety and Health Appraisal Program,`` established the mission of EH-24 to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The purpose of this assessment is to provide the Secretary of Energy and senior DOE managers with concise independent information as part of DOE`s continuing effort to improve environmental program performance. The ultimate goal of EH-24 is enhancement of environmental protection and the minimization of risk to public health and the environment. The routine environmental audit is one method by which EH-24 accomplishes its mission, utilizing systematic and periodic evaluations of the Department`s environmental programs within line organizations.

  8. IMPROVE Site Maintenance SOP 226, Version 2

    E-Print Network [OSTI]

    Fischer, Emily V.

    , and Connectors.. .10 9.3.3.4 Pump Maintenance and Equipment ReplacementIMPROVE Site Maintenance SOP 226, Version 2 TI 226A: Site Maintenance for Field Technicians Date: July 2nd, 2013 Page 1 of 13 TI 226A Site Maintenance for Field Technicians Table of Contents 1

  9. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Iron production maintenance effectiveness system

    SciTech Connect (OSTI)

    Augstman, J.J. [Dofasco Inc., Hamilton, Ontario (Canada)

    1996-12-31

    In 1989, an internal study in the Coke and Iron Maintenance Department identified the opportunities available to increase production, by decreasing unscheduled maintenance delays from 4.6%. A five year front loaded plan was developed, and presented to the company president. The plan required an initial investment of $1.4 million and a conservative break-even point was calculated to be 2.5 years. Due to budget restraints, it would have to be self-funded, i.e., generate additional production or savings, to pay for the program. The program began in 1991 at number 2 coke plant and the blast furnaces. This paper will describe the Iron Production Maintenance Effectiveness System (ME), which began with the mechanical and pipefitting trades.

  11. Improvements of the crystal routine for collimation studies

    E-Print Network [OSTI]

    Mirarchi, D; Scandale, W; Taratin, A M; Yazynin, I

    2014-01-01

    A routine has been implemented to simulate interactions of protons with bent crystals in the collimation version of SixTrack. This routine is optimized in view of producing high-statistics tracking simulations of collimation cleaning assisted by bent crystals. Fine tuning and comparisons with experimental data of coherent effects which a particle can experience in a bent crystal have been carried out. The data taken with 400 GeV beams at the CERN-SPS North Area in the framework of the UA9 experiment are used to benchmark the routine. Further checks on low probability interactions have been made, leading to significant improvements in the description of interactions with crystals. Comparisons with other simulations tools are used to increase our confidence in the scaling to higher energies.

  12. Thermography instruments for predictive maintenance

    SciTech Connect (OSTI)

    Palko, E.

    1993-08-12

    Thermography (infrared imaging, or IR scanning) is not only the most versatile predictive maintenance technology available today; it is, in general, the most cost-effective. Plant engineering can apply a virtually unlimited variety of predictive maintenance instruments, but all are restricted regarding the types of existing and incipient problems they can detect. Inplant applications of thermography, however, are truly limited only by the extent of the plant engineer's imagination. Here are ways that thermography can be used to fight downtime in plants, and factors to consider when selecting the best instrument for particular circumstances.

  13. Improvements for extending the time between maintenance periods for the Heidelberg ion beam therapy center (HIT) ion sources

    SciTech Connect (OSTI)

    Winkelmann, Tim, E-mail: tim.winkelmann@med.uni-heidelberg.de; Cee, Rainer; Haberer, Thomas; Naas, Bernd; Peters, Andreas; Schreiner, Jochen [Heidelberger Ionenstrahl-Therapie Centrum (HIT), D -69120 Heidelberg (Germany)] [Heidelberger Ionenstrahl-Therapie Centrum (HIT), D -69120 Heidelberg (Germany)

    2014-02-15

    The clinical operation at the Heidelberg Ion Beam Therapy Center (HIT) started in November 2009; since then more than 1600 patients have been treated. In a 24/7 operation scheme two 14.5 GHz electron cyclotron resonance ion sources are routinely used to produce protons and carbon ions. The modification of the low energy beam transport line and the integration of a third ion source into the therapy facility will be shown. In the last year we implemented a new extraction system at all three sources to enhance the lifetime of extraction parts and reduce preventive and corrective maintenance. The new four-electrode-design provides electron suppression as well as lower beam emittance. Unwanted beam sputtering effects which typically lead to contamination of the insulator ceramics and subsequent high-voltage break-downs are minimized by the beam guidance of the new extraction system. By this measure the service interval can be increased significantly. As a side effect, the beam emittance can be reduced allowing a less challenging working point for the ion sources without reducing the effective beam performance. This paper gives also an outlook to further enhancements at the HIT ion source testbench.

  14. FINAL REPORT ESTABLISHMENT AND MAINTENANCE

    E-Print Network [OSTI]

    Rathbun, Julie A.

    #12;FINAL REPORT ESTABLISHMENT AND MAINTENANCE OF A MANNED LUNAR BASE IN THE TIME PERIOD 1970. Phase One: Presupply ......... . 1 2. Phase Two: Manned Lunar Landings . 6 3. Phase Three: Logistic Base Class Vehicles ...... . Competing Rendezvous Modes. Concepts: Manned Lunar Landings Logistic Base

  15. Maintenance neutron coincidence counter manual

    SciTech Connect (OSTI)

    Krick, M.S.; Polk, P.J.; Atencio, J.D.

    1989-09-01

    A compact thermal-neutron coincidence counter has been constructed specifically for use by the International Atomic Energy Agency as a reference neutron detector for maintenance activities. The counter is designed for use only with {sup 252}Cf sources in SR-CF-100 capsules. This manual describes the detector's mechanical and electrical components and its operating characteristics. 2 refs., 8 figs.

  16. Knowledge-Projection for Tele-Maintenance

    E-Print Network [OSTI]

    Tu, Yicheng

    · Maintenance-based processes ­ planned maintenance, shipboard troubleshooting, intermediate and depot level Components · Dynamic Process ­ Step-by-step description of events, decision points, drill-down points, data

  17. Improving maintenance operation through transformational outsourcing

    E-Print Network [OSTI]

    Ye, Jacqueline Ming-Shih

    2007-01-01

    Outsourcing maintenance to third-party contractors has become an increasingly popular option for manufacturers to achieve tactical and/or strategic objectives. Though simple in concept, maintenance outsourcing is difficult ...

  18. AUDIO-VISUAL AND MAINTENANCE SERVICES

    E-Print Network [OSTI]

    Victoria, University of

    AUDIO-VISUAL AND MAINTENANCE SERVICES University Policy No: AD2510 Classification: Administration Approving authority: Vice-President Finance and Operations Effective date: September, 2010 Supersedes for Audio Visual: services, equipment rental and maintenance on campus. DEFINITIONS For the purposes

  19. Maintenance cost studies of present aircraft subsystems

    E-Print Network [OSTI]

    Pearlman, Chaim Herman Shalom

    1966-01-01

    This report describes two detailed studies of actual maintenance costs for present transport aircraft. The first part describes maintenance costs for jet transport aircraft broken down into subsystem costs according to an ...

  20. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  1. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  4. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  12. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  13. Africa's Transport Infrastructure Mainstreaming Maintenance and...

    Open Energy Info (EERE)

    Africa's Transport Infrastructure Mainstreaming Maintenance and Management Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Africa's Transport Infrastructure...

  14. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. Standard hydrogen monitoring system - E operation and maintenance manual

    SciTech Connect (OSTI)

    Schneider, T.C.

    1997-06-01

    The purpose of this document is to provide information for the operation and maintenance of the Standard Hydrogen Monitoring System- E (SHMS-E) used in the 200E and 20OW area tank farms on the Hanford Site. This provides information specific to the mechanical operation of the system and is not intended to take the place of a Plant Operating Procedure. However, it does provide more information on the system than a Plant Operating Procedure. The intent here is that the system is started up by a technician or engineer who has completed tank farms training course for SHMS, and then the only actions performed by Operations will be routine log taking. If any problems not addressed by the operating procedure are encountered with the unit, engineering should be contacted.

  16. Financial Policy Manual 1103 ACCOUNTING SYSTEM MAINTENANCE

    E-Print Network [OSTI]

    George, Edward I.

    Financial Policy Manual Page 1 1103 ACCOUNTING SYSTEM MAINTENANCE Effective: December 1986 Revised Maintenance of BEN Financials (BEN), the financial accounting system is necessary to ensure financial accounting and reporting integrity. POLICY 1. Financial Systems is responsible for the maintenance of BEN. 2

  17. Facility Operations and Maintenance Facilities Management

    E-Print Network [OSTI]

    Capogna, Luca

    Facility Operations and Maintenance Facilities Management D101 Facilities Management R -575/affirmative action institution. 354 3 373 4 373A,B,C,D 4 Alm8/31/12 #12;Facility Operations and Maintenance, B 5 1409 5 1403 5 1403 A, B 4 1408 3 1408 A,B,C 3 1610 3 #12;Facility Operations and Maintenance

  18. Institute for Software Technology Software Maintenance

    E-Print Network [OSTI]

    1 Institute for Software Technology Software Maintenance VU 3.0 WS 2006 Univ.Prof. Dr. Franz Wotawa Institut für Softwaretechnologie wotawa@ist.tugraz.at VU Software Maintenance 2Institute for Software Technology Wozu Software Maintenance? Meine Software ist immer korrekt! Keine Modifikationen. Nur neue

  19. Cryogenic Neutron Protein Crystallography: routine methods and potential benefits

    SciTech Connect (OSTI)

    Weiss, Kevin L [ORNL; Tomanicek, Stephen J [ORNL; NG, Joseph D [ORNL

    2014-01-01

    The use of cryocooling in neutron diffraction has been hampered by several technical challenges such as the need for specialized equipment and techniques. Recently we have developed and deployed equipment and strategies that allow for routine neutron data collection on cryocooled crystals using off the shelf components. This system has several advantages, compared to a closed displex cooling system such as fast cooling coupled with easier crystal mounting and centering. The ability to routinely collect cryogenic neutron data for analysis will significantly broaden the range of scientific questions that can be examined by neutron protein crystallography. Cryogenic neutron data collection for macromolecules has recently become available at the new Biological Diffractometer BIODIFF at FRM II and the Macromolecular Diffractometer (MaNDi) at the Spallation Neutron Source, Oak Ridge National Laboratory. To evaluate the benefits of a cryocooled neutron structure we collected a full neutron data set on the BIODIFF instrument on a Toho-1 lactamase structure at 100K.

  20. CRAD, Maintenance - Los Alamos National Laboratory Waste Characterizat...

    Office of Environmental Management (EM)

    Maintenance - Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility CRAD, Maintenance - Los Alamos National Laboratory Waste Characterization,...

  1. Routine environmental audit of Ames Laboratory, Ames, Iowa

    SciTech Connect (OSTI)

    NONE

    1994-09-01

    This document contains the findings identified during the routine environmental audit of Ames Laboratory, Ames, Iowa, conducted September 12--23, 1994. The audit included a review of all Ames Laboratory operations and facilities supporting DOE-sponsored activities. The audit`s objective is to advise the Secretary of Energy, through the Assistant Secretary for Environment, Safety and Health, as to the adequacy of the environmental protection programs established at Ames Laboratory to ensure the protection of the environment, and compliance with Federal, state, and DOE requirements.

  2. Evaluation of Routine Atmospheric Sounding Measurements Using Unmanned Systems

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES October 27th,EnvironmentalEqual7/31/2016Routine Atmospheric

  3. Building Maintenance Technician | Princeton Plasma Physics Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Thomas Ward Requisition Number: 1500684 POSITION SUMMARY: Under the supervision of the General Lead Technician and Lead Building Maintenance Technician, the candidate will be...

  4. Robust Maintenance Policies in Asset Management

    E-Print Network [OSTI]

    Kuhn, Kenneth D.; Madanat, Samer M.

    2005-01-01

    Repair Policies in Asset Management Under Uncertain FacilityMAINTENANCE POLICIES IN ASSET MANAGEMENT Kenneth D. KuhnBerkeley, USA ABSTRACT Asset management systems help public

  5. FAQS Reference Guide – Facility Maintenance Management

    Office of Energy Efficiency and Renewable Energy (EERE)

    This reference guide addresses the competency statements in the April 2014 edition of DOE Standard DOE-STD-1181-2014, Facility Maintenance Management Functional Area Qualification Standard.

  6. Pacific Northwest National Laboratory Grounds Maintenance

    SciTech Connect (OSTI)

    2009-08-05

    FEMP Water Efficiency Best Management Practice #4 and #5: Case study overview of the grounds maintenance program for Pacific Northwest National Laboratory.

  7. Mining Test Cases To Improve Software Maintenance

    E-Print Network [OSTI]

    Ziftci, Celal

    1.1 Software Development Processes . . . . . . . . . .1.2 Software Maintenance: the MostCostly Activity in the Software Devel- opment

  8. Risk Based Maintenance Optimization using Probabilistic Maintenance Quantification Models of Circuit Breaker 

    E-Print Network [OSTI]

    Natti, Satish

    2010-01-14

    New maintenance techniques for circuit breakers are studied in this dissertation by proposing a probabilistic maintenance model and a new methodology to assess circuit breaker condition utilizing its control circuit data. ...

  9. CRAD, Maintenance- Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for an assessment of the Maintenance Program portion of an Operational Readiness Review at the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility.

  10. CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

  11. Routine environmental audit of the Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  12. Maintenance for the Millennium: Another Approach

    SciTech Connect (OSTI)

    Sculthorpe, Barruy R.

    2002-07-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  13. TABLE OF CONTENTS Tree Maintenance and Removal

    E-Print Network [OSTI]

    US Army Corps of Engineers

    protection should be worn for all tree maintenance and removal operations. b. Training shall be providedEM 385-1-1 30 Nov 14 31-i Section 31 TABLE OF CONTENTS Tree Maintenance and Removal Section: Page ....................................................................... 31-10 31.E Other Operations and Equipment

  14. IUCBRF Lesson: Case Base Maintenance Policies

    E-Print Network [OSTI]

    Indiana University

    by Steven Bogaerts & David Leake. This material may be distributed only subject to the terms and conditions long-term use, maintenance becomes an important concern. Conse- quently, maintenance has received of case use in larger case bases. More precisely, define case age as the number of episodes a CBR system

  15. Maintenance of Stormwater Wetlands and Wet Ponds

    E-Print Network [OSTI]

    Hunt, William F.

    1 Maintenance of Stormwater Wetlands and Wet Ponds Stormwater management practices must be kept maintenance guidelines for stormwater wetlands and wet ponds, two stormwater prac- tices that are being constructed across North Carolina. OVERVIEW As its name implies, a stormwater wetland is a wetland system

  16. Monolithic torpedo bottle lining at Weirton Steel Corporation

    SciTech Connect (OSTI)

    Baker, R.; Griffith, E. [Weirton Steel Corp., WV (United States)

    1996-12-31

    In late 1992 and early 1993 Weirton Steel burned through three torpedo bottles in a three-month period. To determine the cause of the burn throughs, a thorough review of bottle maintenance practices was initiated. Upon identification of contributing factors, changes in operating practices were made. In an effort to increase bottle reliability, lining trials were initiated. Among the trials, a monolithic lining was installed and this paper will discuss results of the lining to date.

  17. Maintenance scheduling for modular systems-models and algorithms

    E-Print Network [OSTI]

    Zarybnisky, Eric J. (Eric Jack), 1979-

    2011-01-01

    Maintenance scheduling is an integral part of many complex systems. For instance, without effective maintenance scheduling, the combined effects of preventative and corrective maintenance can have severe impacts on the ...

  18. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular maintenance to...

  19. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-06-01

    To define the program for the management of cost-effective maintenance of Department of Energy (DOE) nuclear facilities. Guidance for compliance with this Order is contained in DOE G 433.1-1, Nuclear Facility Maintenance Management Program Guide for use with DOE O 433.1, which references Federal regulations, DOE directives, and industry best practices using a graded approach to clarify requirements and guidance for maintaining DOE-owned Government property. (Cancels DOE 4330.4B, Chapter II, Maintenance Management Program, dated 2-10-94.) Cancels DOE 4330.4B (in part). Canceled by DOE O 433.1A.

  20. Solar Water Heating System Maintenance and Repair | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Rooftop solar water heaters need regular maintenance to operate at peak efficiency. | Photo from iStockphoto.com Rooftop solar water heaters need regular maintenance to operate at...

  1. FEMP Offers New Training on Photovoltaic Operations and Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices FEMP Offers New Training on Photovoltaic Operations and Maintenance Best Practices November 4,...

  2. Microsoft Word - 052606 Final Pepco DOE maintenance notice.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is providing you with information regarding the planned transmission maintenance outage scheduled for the upcoming weekend. Pepco notes that the scheduled maintenance...

  3. Hopper scheduled maintenance tomorrow (Sept 19) and /project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scheduled maintenance tomorrow (Sept 19) and project outage Hopper scheduled maintenance tomorrow (Sept 19) and project outage September 18, 2012 by Helen He (0 Comments) There...

  4. Solar Water Heating System Maintenance and Repair | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solar Water Heating System Maintenance and Repair Solar Water Heating System Maintenance and Repair May 30, 2012 - 2:35pm Addthis Rooftop solar water heaters need regular...

  5. Planning and Reporting for Operations and Maintenance in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts Planning and Reporting for Operations and Maintenance in Federal Energy...

  6. Operations & Maintenance Best Practices Guide: Chapter 4 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Operations & Maintenance Best Practices Guide: Chapter 4 Guide to chapter 4 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency. Chapter...

  7. Risk impact of maintenance program changes

    E-Print Network [OSTI]

    Credit, Kimberly A. (Kimberly April)

    1992-01-01

    This study quantifies the change in one measure of plant risk, the frequency of loss of long-term decay heat removal, due to changes in maintenance at the James A. Fitzpatrick (JAF) plant. Quantification is accomplished ...

  8. Low-Maintenance Wind Power System

    E-Print Network [OSTI]

    Rasson, Joseph E

    2010-01-01

    with widespread adoption of wind energy. The project hasProject: Low-Maintenance Wind Power System Summary of theImproved Vertical Axis Wind Turbine and Aerodynamic Control

  9. Operations and Maintenance for Major Equipment Types

    Broader source: Energy.gov [DOE]

    Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

  10. Information Technology for Energy and Maintenance Management 

    E-Print Network [OSTI]

    Villafana, L.; Federspiel, C.

    2003-01-01

    and application specific information about the building maintenance process. They could be designed with similar terms in the same query, producing a simplified thesaurus. A key advantage of using codified actions instead of trying to predict action similarity...

  11. Operation & Maintenance for Quality Indoor Air 

    E-Print Network [OSTI]

    Downing, C.; Bayer, C. W.

    1990-01-01

    The results of numerous Indoor Air Quality (IAQ) building investigations conducted by the Georgia Tech Research Institute have shown that building Operation and Maintenance (O&M) is a very common source of IAQ problems. This paper presents...

  12. Routine environment audit of the Kansas City Plant, Kansas City, Missouri

    SciTech Connect (OSTI)

    1994-11-01

    This report documents the results of the routine environmental audit of the Kansas City Plant, Kansas City, Missouri. During this audit the activities the audit team conducted included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE) and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted October 24-November 4, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety, and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24, which is to provide comprehensive, independent oversight of Department-wide environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of the Department`s environmental programs within line organizations and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  13. Routine environmental audit of the Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    NONE

    1994-09-01

    This report documents the results of the routine environmental audit of the Oak Ridge Y-12 Plant (Y-12 Plant), Anderson County, Tennessee. During this audit, the activities conducted by the audit team included reviews of internal documents and reports from previous audits and assessments; interviews with U.S. Department of Energy (DOE), State of Tennessee regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted August 22-September 2, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). DOE 5482.1 B, {open_quotes}Environment, Safety, and Health Appraisal Program,{close_quotes} establishes the mission of EH-24 to provide comprehensive, independent oversight of DOE environmental programs on behalf of the Secretary of Energy. The ultimate goal of EH-24 is enhancement of environmental protection and minimization of risk to public health and the environment. EH-24 accomplishes its mission by conducting systematic and periodic evaluations of DOE`s environmental programs within line organizations, and by using supplemental activities that strengthen self-assessment and oversight functions within program, field, and contractor organizations. The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  14. Electrical Transmission Line Diametrical Retention Mechanism

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

    2006-01-03

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

  15. Pressure maintenance in a volatile oil reservoir 

    E-Print Network [OSTI]

    Schuster, Bruce Alan

    1989-01-01

    PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May, 1989 Major... Subject: Petroleum Engineering PRESSURE MAINTENANCE IN A VOLATILE OIL RESERVOIR A Thesis BRUCE ALAN SCHUSTER Approved as to style and content by: S. A. Holditch (Chair of Committee) W. J. Lee (Member) R. R, Berg (Member) , Jz W. D. Von Gonten...

  16. Substations reliability-centered maintenance and predictive maintenance - a strategic partnership

    SciTech Connect (OSTI)

    Colsher, R.J. [Electric Power Research Institute, Eddystone, PA (United States); Abbott, P.D.; Matusheski, R.L. [EPRI & MD Center, Eddystone, PA (United States); Smith, S.B. [ERIN Engineering & Research, Walnut Creek, CA (United States)

    1996-08-01

    A maintenance optimization study for substation components can be most effective when Reliability Centered Maintenance (RCM) Analysis is combined with a Predictive Maintenance (PDM) Assessment. If the two processes are performed concurrently, the benefit-to-cost ratios for each is increased. Also, the cost of implementing RCM recommendations for condition monitoring can be minimized, while maximizing their impact at the same time. This paper presents the essential elements of both the RCM and PDM processes, and describes how they work together in a substation environment as a comprehensive maintenance assessment tool. Descriptions of recent experiences are also included.

  17. Original Contribution Is heart rate variability better than routine vital signs for prehospital

    E-Print Network [OSTI]

    Original Contribution Is heart rate variability better than routine vital signs for prehospital- formation, beyond routine vital signs, for making a specific clinical assessment: identification patients were analyzed retrospectively, excluding those who lacked a com- plete set of reliable vital signs

  18. Accelerated learning approaches for maintenance training

    SciTech Connect (OSTI)

    Erickson, E.J.

    1991-01-01

    As a training tool, Accelerated Learning techniques have been in use since 1956. Trainers from a variety of applications and disciplines have found success in using Accelerated Learning approaches, such as training aids, positive affirmations, memory aids, room arrangement, color patterns, and music. Some have thought that maintenance training and Accelerated Learning have nothing in common. Recent training applications by industry and education of Accelerated Learning are proving very successful by several standards. This paper cites available resource examples and challenges maintenance trainers to adopt new ideas and concepts to accelerate learning in all training setting. 7 refs.

  19. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory's (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  20. Pacific Northwest Laboratory FY 1993 Site Maintenance Plan for maintenance of DOE nonnuclear facilities

    SciTech Connect (OSTI)

    Bright, J.D.

    1992-09-28

    This Site Maintenance Plan has been developed for Pacific Northwest Laboratory`s (PNL) Nonnuclear Facilities. It is based on requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter I, Change No. 4. The objective of this maintenance plan is to provide baseline information for compliance to the DOE Order 4330.4A, to identify needed improvements, and to document the planned maintenance budget for Fiscal Year (FY) 1993 and to estimate maintenance budgets for FY 1994 and FY 1995 for all PNL facilities. Using the results of the self-assessment, PNL has selected 12 of the 36 elements of the Maintenance Program defined by DOE Order 4330.4A, Chapter I, for improvement. The elements selected for improvement are: Facility Condition Inspections; Work Request (Order) System; Formal Job Planning and Estimating; Work Performance (Time) Standards; Priority System; Maintenance Procedures and Other Work-Related Documents; Scheduling System; Post Maintenance Testing; Backlog Work Control; Equipment Repair History and Vendor Information; Work Sampling; and Identification and Control. Based upon a graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods.

  1. Steam Trap Maintenance as a Profit Center 

    E-Print Network [OSTI]

    Bouchillon, J. L.

    1996-01-01

    program at a large, 4000 trap chemical plant. The previously "good" maintenance program which was losing $565,000 per year in steam was turned into a $485,000 per year cost savings. This paper will also give the steps that can in as few as 3 months...

  2. Project Surveillance and Maintenance Plan. [UMTRA Project

    SciTech Connect (OSTI)

    Not Available

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

  3. Robot Behavior Adaptation for Formation Maintenance

    E-Print Network [OSTI]

    López-Sánchez, Maite

    1 Robot Behavior Adaptation for Formation Maintenance Maite López-Sánchez maite@maia.ub.es WAI): ­1 or 2 reference robots to follow ­keeping fixed angle (formation property) ­and fixed distance d (separation distance) · related to robot visibility range, speed or reaction capabilities Basic behaviors I

  4. A Ubiquitous Computing Environment for Aircraft Maintenance

    E-Print Network [OSTI]

    practical experience from a project that was carried out in cooperation with an aircraft company1 and SAP SI level of usability. A scenario, a systems architecture, and maintenance applications are presented Descriptors J.7 [Computer Applications]: Computers in Other Systems ­ industrial control, process control

  5. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  6. Davis PV plant operation and maintenance manual

    SciTech Connect (OSTI)

    1994-09-01

    This operation and maintenance manual contains the information necessary to run the Photovoltaics for Utility Scale Applications (PVUSA) test facility in Davis, California. References to more specific information available in drawings, data sheets, files, or vendor manuals are included. The PVUSA is a national cooperative research and demonstration program formed in 1987 to assess the potential of utility scale photovoltaic systems.

  7. Sensor, method and system of monitoring transmission lines

    DOE Patents [OSTI]

    Syracuse, Steven J.; Clark, Roy; Halverson, Peter G.; Tesche, Frederick M.; Barlow, Charles V.

    2012-10-02

    An apparatus, method, and system for measuring the magnetic field produced by phase conductors in multi-phase power lines. The magnetic field measurements are used to determine the current load on the conductors. The magnetic fields are sensed by coils placed sufficiently proximate the lines to measure the voltage induced in the coils by the field without touching the lines. The x and y components of the magnetic fields are used to calculate the conductor sag, and then the sag data, along with the field strength data, can be used to calculate the current load on the line and the phase of the current. The sag calculations of this invention are independent of line voltage and line current measurements. The system applies a computerized fitter routine to measured and sampled voltages on the coils to accurately determine the values of parameters associated with the overhead phase conductors.

  8. Examing the Nonroutine Acts of Emergency Workers and How They Become Routine 

    E-Print Network [OSTI]

    McDonald, Camille M.

    2011-10-21

    The purpose of this study is to determine how nonroutine acts performed by iii trained emergency workers developed into routine emergency acts and skills. I will be specifically looking for concepts that are common throughout the different types...

  9. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Broader source: Energy.gov (indexed) [DOE]

    The Long-Term Surveillance Operations and Maintenance (LTS-O&M) subtask has a critical long-term surveillance and maintenance (LTS&M) role for the U.S. Department of Energy (DOE)...

  10. The Causes and Maintenance of Personality in Yellow-bellied Marmots (Marmota flaviventris)

    E-Print Network [OSTI]

    Petelle, Matthew Brian

    2014-01-01

    Blumstein D.T. 2014. Development, causes, and maintenance oftrait. Several hypotheses for the causes and maintenance ofOF CALIFORNIA Los Angeles The Causes and Maintenance of

  11. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    E-Print Network [OSTI]

    Wang, Liping

    2014-01-01

    of building, operations and maintenance play a significantin building operation and maintenance have been neglected.of building, operation and maintenance play a decisive role.

  12. Squall-Line Intensification via Hydrometeor Recirculation ROBERT B. SEIGEL AND SUSAN C. VAN DEN HEEVER

    E-Print Network [OSTI]

    Collett Jr., Jeffrey L.

    (RAMS) and includes a control simulation that uses full two-moment microphysics and three sensitivity line. As the hail falls below the freezing level, the rear-inflow jet (RIJ) advects the hail-inflow jet (RIJ) has been shown to be a key component in the structure and maintenance of squall lines (Smull

  13. Maintenance and Operations study for K basins sludge treatment

    SciTech Connect (OSTI)

    WESTRA, A.G.

    1998-11-30

    This study evaluates maintenance and operating concepts for the chemical treatment of sludge from the 100 K Basins at Hanford. The sludge treatment equipment that will require remote operation or maintenance was identified. Then various maintenance and operating concepts used in the nuclear industry were evaluated for applicability to sludge treatment. A hot cell or cells is recommended as the best maintenance and operating concept for a sludge treatment facility.

  14. Software Maintenance from a Service Perspective* FRANK NIESSINK1

    E-Print Network [OSTI]

    van Vliet, Hans

    , customers will judge the quality of software maintenance differently from that of software development of software maintenance differently from that of software development. This means that to deliver high quality results in software maintenance, both the functional quality and the technical quality dimension

  15. Design, maintenance and operational aspects of the CNGS target

    E-Print Network [OSTI]

    McDonald, Kirk

    Design, maintenance and operational aspects of the CNGS target M. Calviani (CERN-EN/STI) on behalfth May 2011MC - Design, maintenance and operational aspects of the CNGS target - 4th HPTW 2 #12;General layout of the CNGS installation 2nd-6th May 2011MC - Design, maintenance and operational aspects

  16. Towards optimal database maintenance in wireless communication systems Amine Chohra

    E-Print Network [OSTI]

    Firenze, Università degli Studi di

    are then necessary; typically, audit operations are used, to perform periodic maintenance actions. Audits checkTowards optimal database maintenance in wireless communication systems Amine Chohra 1* , Stefano scheduled maintenance policies are necessary. However, the short-persistence of most of the data stored

  17. Diagnosis and prognosis for the maintenance of complex systems

    E-Print Network [OSTI]

    Pencolé, Yannick

    informative pieces of data to decide which type of maintenance operations is required. These types of systemsDiagnosis and prognosis for the maintenance of complex systems Pauline Ribot1,2 , Yannick Pencol´e1--This paper adresses the problem of maintenance of a complex and heterogeneous system like an aircraft

  18. Quantifying Maintenance Requirements From the Steady-State Operation

    E-Print Network [OSTI]

    Daugulis, Andrew J.

    Quantifying Maintenance Requirements From the Steady-State Operation of a Two-Phase Partitioning remarkably through achievement of steady-state operation. The data conclusively show that maintenance and explicitly quantifying the maintenance energy requirements of pure cultures growing on volatile organic

  19. Open Source Software Maintenance Process Framework Timo Koponen

    E-Print Network [OSTI]

    Scacchi, Walt

    provides required operations, their inputs and outputs. Most of the maintenance activities are similar30 Open Source Software Maintenance Process Framework Timo Koponen Department of Computer Science.hotti@uku.fi ABSTRACT To identify the Open Source maintenance process two well known Open Source projects Apache HTTP

  20. Local Monitoring and Maintenance for Operational Wireless Sensor

    E-Print Network [OSTI]

    Wu, Jie

    Local Monitoring and Maintenance for Operational Wireless Sensor Networks Md Zakirul Alam Bhuiyan@gmail.com; csgjwang@gmail.com #12;Local Monitoring and Maintenance for Operational Wireless Sensor Networks 16 Monitoring and Maintenance for Operational Wireless Sensor Networks 16/7/2013 IEEE ISPA-13, Melbourne

  1. Kernel spectral clustering for predicting maintenance of industrial machines

    E-Print Network [OSTI]

    status, but the operations are labor inten- sive and prone to human errors. Condition-based maintenance monitoring of machine parts leads to reliable and accurate lifetime predictions, and maintenance operationsKernel spectral clustering for predicting maintenance of industrial machines Rocco Langone1, Carlos

  2. CX-002671: Categorical Exclusion Determination | Department of...

    Office of Environmental Management (EM)

    1: Categorical Exclusion Determination CX-002671: Categorical Exclusion Determination Vegetation Management - Routine Maintenance Along Captain Jack-Olinda Transmission Line CX(s)...

  3. CX-009411: Categorical Exclusion Determination | Department of...

    Office of Environmental Management (EM)

    411: Categorical Exclusion Determination CX-009411: Categorical Exclusion Determination Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads CX(s)...

  4. CX-008790: Categorical Exclusion Determination | Department of...

    Office of Environmental Management (EM)

    90: Categorical Exclusion Determination CX-008790: Categorical Exclusion Determination Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San...

  5. Hemodynamic Monitoring TRANSTHORACIC LINES

    E-Print Network [OSTI]

    Kay, Mark A.

    and with position changes. 5. All lines should have either heparinized saline or D5W infusing. 6. Avoid infusing the line. 9. Never use LA for infusions or bolus medications. 10. Vigilant observation for AIR. B. Line

  6. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-02-13

    The Order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of Structures, Systems and Components (SSCs) that are part of the safety basis required by 10 CFR 830.202.1 at hazard category 1, 2 and 3 Department of Energy (DOE) nuclear facilities. Cancels DOE O 433.1. Canceled by DOE O 433.1B.

  7. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013. Cancels DOE O 433.1A.

  8. Maintenance Management Program for DOE Nuclear Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-04-21

    The order defines the safety management program required by 10 CFR 830.204(b)(5) for maintenance and the reliable performance of structures, systems and components that are part of the safety basis required by 10 CFR 830.202 at hazard category 1, 2 and 3 DOE nuclear facilities. Admin Chg 1, dated 3-12-2013, supersedes DOE O 433.1B.

  9. LEED for Existing Buildings Operations and Maintenance 

    E-Print Network [OSTI]

    Reihl, K.

    2013-01-01

    &M ESL-KT-13-12-54 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Materials and Resources Prerequisite 1 Sustainable Purchasing Policy Identify more environmentally friendly products Purchase when... where it is used. Do you recycle? Review what you purchase. Is it sustainable with recycled content? Establish policies and procedures for maintenance and keep records. ESL-KT-13-12-54 CATEE 2013: Clean Air Through Energy Efficiency Conference, San...

  10. Review of maintenance personnel practices at nuclear power plants

    SciTech Connect (OSTI)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations.

  11. Plains and Eastern Clean Line Transmission Line: Comment from...

    Energy Savers [EERE]

    Plains and Eastern Clean Line Transmission Line: Comment from Marshall Hughes Plains and Eastern Clean Line Transmission Line: Comment from Marshall Hughes Comment submitted on...

  12. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Environmental Management (EM)

    from Block Plains and Eastern Clean Line: Arkansas and Oklahoma Plains and Eastern Clean Line Transmission Line: Comment from Block Plains and Eastern Clean Line: Arkansas and...

  13. Second Line of Defense Spares Program

    SciTech Connect (OSTI)

    Henderson, Dale L.; Holmes, Aimee E.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.; Thorsen, Darlene E.

    2012-11-20

    During Fiscal Year 2012, a team from the Pacific Northwest National Laboratory (PNNL) conducted an assessment and analysis of the Second Line of Defense (SLD) Sustainability spare parts program. Spare parts management touches many aspects of the SLD Sustainability Program including contracting and integration of Local Maintenance Providers (LMP), equipment vendors, analyses and metrics on program performance, system state of health, and maintenance practices. Standardized spares management will provide better data for decisions during site transition phase and will facilitate transition to host country sustainability ownership. The effort was coordinated with related SLD Sustainability Program initiatives, including a configuration items baselining initiative, a metrics initiative, and a maintenance initiative. The spares study has also led to pilot programs for sourcing alternatives that include regional intermediate inventories and partnering agreements that leverage existing supply chains. Many partners from the SLD Sustainability program contributed to and were consulted in the course of the study. This document provides a description of the findings, recommendations, and implemented solutions that have resulted from the study.

  14. Maintenance Awareness in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac J. Sreenan

    E-Print Network [OSTI]

    Sreenan, Cormac J.

    the lifetime of batteries, a major part of the operation costs is expected to be consumed by maintenance costs in the field a maintenance operation. Each maintenance operation has an associated maintenance cost Cm. The point in time and the structure of a maintenance operation is defined by a maintenance policy P. During

  15. Plant maintenance and outage management issue, 2005

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2005-01-15

    The focus of the January-February issue is on plant maintenance and outage managment. Major articles/reports in this issue include: Dawn of a new era, by Joe Colvin, Nuclear Energy Institute (NEI); Plant profile: Beloyarsk NPP, Russia, by Nikolai Oshkanov, Beloyarsk NPP, Russia; Improving economic performance, by R. Spiegelberg-Planner, John De Mella, and Marius Condu, IAEA; A model for improving performance, by Pet Karns, MRO Software; ASME codes and standards, by Shannon Burke, ASME International; and, Refurbishment programs, by Craig S. Irish, Nuclear Logistics, Inc.

  16. Onsite Wastewater Treatment Systems: Operation and Maintenance 

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2008-10-23

    Two-compartment septic tank Perforated pipe for effluent disposal Sand/loam soil Gravel Geotextile fabric Onsite wastewater treatment systems Operation and maintenance L-5347 8-08 Figure 1: A septic tank and soil absorption field system. I f your home or business uses... system or consult manufactur- ers? literature. A conventional septic system ?the most common onsite wastewa- ter treatment system?consists of a septic tank and a soil absorption field. Wastewater from a home or busi- ness first goes to the septic tank...

  17. Converting urban tree maintenance residue to energy

    SciTech Connect (OSTI)

    Murphey, W.K.; Massey, J.G.; Sumrall, A.

    1980-01-01

    Three methods of utilizing urban wood waste collected by a tree maintenance firm in Houston, Texas (handling 30,000 ton waste/year) are examined: (a) hauling to a remote landfill; (b) chipping and hauling to a (local) power plant and converting to electricity; and (c) chipping and selling to an outside firm for use as boiler fuel. Breakdown of costs are given for each method in monetary and energy terms. Method (b) was the cheapest, producing a net energy gain (870 million Btu/day), but the firm chose method (c), since it realized a direct monetary return.

  18. Year 2000 TWRS Maintenance procedure review report

    SciTech Connect (OSTI)

    ADAMS, M.R.

    1999-02-24

    A concern exists that some equipment in use might contain microprocessors that are dependent upon a time date function. The majority of the software programming for microprocessors has only utilized a 2 digit identifier for the year. With the approach of the year 2000, (Y2K), there is concern that the date function will not be correctly recognized and some functions will not operate properly. TWRS maintenance procedures have been reviewed to identify equipment components that may not be Y2K compliant. Engineering judgment was utilized to eliminate procedures and equipment that is obviously not impacted by Y2K.

  19. Surface Magnetic Flux Maintenance In Quiet Sun

    E-Print Network [OSTI]

    Y. Iida

    2012-12-27

    We investigate surface processes of magnetic patches, namely merging, splitting, emergence, and cancellation, by using an auto-detection technique. We find that merging and splitting are locally predominant in the surface level, while the frequencies of the other two are less by one or two orders of magnitude. The frequency dependences on flux con- tent of surface processes are further investigated. Based on these observations, we discuss a possible whole picture of the maintenance. Our conclusion is that the photospheric magnetic field structure, especially its power-law nature, is maintained by the processes locally in the surface not by the interactions between different altitudes. We suggest a scenario of the flux maintenance as follows: The splitting and merging play a crucial role for the generation of the power-law distribution, not the emergence nor cancellation do. This power-law distribution results in another power-law one of the cancellation with an idea of the random convective transport. The cancellation and emergence have a common value for the power-law indices in their frequency distributions, which may suggest a "recycle of fluxes by submergence and re-emergence".

  20. INTRODUCTION Fish routinely exhibit a level of agility that far surpasses the level

    E-Print Network [OSTI]

    Mittal, Rajat

    4043 INTRODUCTION Fish routinely exhibit a level of agility that far surpasses the level that human-engineered underwater vehicles have been able to achieve (Bandyopadhyay, 2002). Fish such as sunfish, perch and goldfish in both quiescent and turbulent flows (Lauder et al., 2006). There are many reasons why fish are more

  1. Moment-Based Probability Modeling and Extreme Response Estimation, The FITS Routine Version 1.2

    SciTech Connect (OSTI)

    MANUEL,LANCE; KASHEF,TINA; WINTERSTEIN,STEVEN R.

    1999-11-01

    This report documents the use of the FITS routine, which provides automated fits of various analytical, commonly used probability models from input data. It is intended to complement the previously distributed FITTING routine documented in RMS Report 14 (Winterstein et al., 1994), which implements relatively complex four-moment distribution models whose parameters are fit with numerical optimization routines. Although these four-moment fits can be quite useful and faithful to the observed data, their complexity can make them difficult to automate within standard fitting algorithms. In contrast, FITS provides more robust (lower moment) fits of simpler, more conventional distribution forms. For each database of interest, the routine estimates the distribution of annual maximum response based on the data values and the duration, T, over which they were recorded. To focus on the upper tails of interest, the user can also supply an arbitrary lower-bound threshold, {chi}{sub low}, above which a shifted distribution model--exponential or Weibull--is fit.

  2. FAILURE DETECTION ROUTINE FOR GRID CONNECTED PV SYSTEMS AS PART OF THE PVSAT-2 PROJECT

    E-Print Network [OSTI]

    Heinemann, Detlev

    FAILURE DETECTION ROUTINE FOR GRID CONNECTED PV SYSTEMS AS PART OF THE PVSAT-2 PROJECT S. Stettler1.stettler@enecolo.ch, tel. +41 44 994 9001, fax. +41 44 994 9005 ABSTRACT: Identification of energy losses in PV systems up automatically analysing the performance of PV systems and, in case of a malfunction, determining possible causes

  3. FY 2014 Real Property Data Related to Operations and Maintenance...

    Energy Savers [EERE]

    Maintenance Reporting Requirement Guidance for Fiscal Year 2015 Facilities Information Management System Data Validations FY 2012 Real Property Deferred, Actual, and Required...

  4. Color Maintenance of LEDs in Laboratory and Field Applications...

    Office of Scientific and Technical Information (OSTI)

    Royer, Michael P.; Tuttle, Ralph; Rosenfeld, Scott M.; Miller, Naomi J. Light-emitting diode (LED), color shift, color stability, color maintenance, warranty Light-emitting...

  5. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    SciTech Connect (OSTI)

    Hendrickson, D.W. [ed.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  6. Interpretation of ageostrophic winds and implications for jet stream maintenance

    E-Print Network [OSTI]

    Wirosoetisno, Djoko

    Interpretation of ageostrophic winds and implications for jet stream maintenance Article Published Version Blackburn, M. (1985) Interpretation of ageostrophic winds and implications for jet stream

  7. Website Maintenance Process and Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    more about EERE's expectations for website maintenance. In June and December every year, Web coordinators will be asked to attend two special Web Governance Team meetings to report...

  8. Maintenance & Cleaning Firm Earns Jefferson Lab's Small Business...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cleaning Firm Earns Jefferson Lab's Small Business Award for 2013 Prestige award Prestige Maintenance staff (left to right) Sandra Coltrain, Operations Managers John Harmon and Tom...

  9. Los Alamos Site Office Nuclear Maintenance Management Program...

    Office of Environmental Management (EM)

    oversight program and activities. This self-assessment was led by the DOE LASO Facility OperationsSafety Engineering Team's (FOSET) Nuclear Facility Maintenance Manager and was...

  10. ANNUAL MAINTENANCE AND LEAK TESTING FOR THE 9975 SHIPPING PACKAGE

    SciTech Connect (OSTI)

    Trapp, D.

    2014-08-25

    The purpose of this document is to provide step-by-step instructions for the annual helium leak test certification and maintenance of the 9975 Shipping Package.

  11. Racing line optimization

    E-Print Network [OSTI]

    Xiong, Ying, S.M. Massachusetts Institute of Technology

    2010-01-01

    Although most racers are good at controlling their cars, world champions are always talented at choosing the right racing line while others mostly fail to do that. Optimal racing line selection is a critical problem in car ...

  12. APPENDIX B: Acrylamide; Chloroform; Ethidium bromide; Formaldehyde; and Trypan blue stain: UTHSCSA ROUTINE MOLECULAR LABORATORY PROCEDURAL USE

    E-Print Network [OSTI]

    Nicholson, Bruce J.

    APPENDIX B: Acrylamide; Chloroform; Ethidium bromide; Formaldehyde; and Trypan blue stain: UTHSCSA bromide; Formaldehyde; and Trypan blue stain: UTHSCSA ROUTINE MOLECULAR LABORATORY PROCEDURAL USE

  13. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    SciTech Connect (OSTI)

    None

    2006-12-01

    This document is the third revision of the 'Monitoring Well Inspection and Maintenance Plan' for groundwater wells associated with the US Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: (1) inspecting the physical condition of monitoring wells at Y-12; (2) identifying maintenance needs that extend the life of the well and assure well-head protection is in place, and (3) identifying wells that no longer meet acceptable monitoring-well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, 'proactive stewardship of the extensive monitoring well network at Y-12' (BWXT 2004a). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality monitoring and hydrologic data are able to be obtained from the well network. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (BWXT 2006b), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data. This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime); (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime); and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of the Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV east of scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bound to the west by a surface drainage feature (Dunaway Branch) and by Scarboro Road to the east. The GWPP maintains an extensive database of construction details and related information for the monitoring wells in each hydrogeologic regime in the 'Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and parts of Bethel Valley on the US DOE Oak Ridge Reservation (BWXT 2003a). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (BWXT 2004a).

  14. Evaluation of Instrumentation and Dynamic Thermal Ratings for Overhead Lines

    SciTech Connect (OSTI)

    Phillips, A.

    2013-01-31

    In 2010, a project was initiated through a partnership between the Department of Energy (DOE) and the New York Power Authority (NYPA) to evaluate EPRI?s rating technology and instrumentation that can be used to monitor the thermal states of transmission lines and provide the required real-time data for real-time rating calculations. The project included the installation and maintenance of various instruments at three 230 kV line sites in northern New York. The instruments were monitored, and data collection and rating calculations were performed for about a three year period.

  15. Single-machine Multiple-recipe Predictive Maintenance , John Hasenbein

    E-Print Network [OSTI]

    Hasenbein, John

    Single-machine Multiple-recipe Predictive Maintenance Yiwei Cai , John Hasenbein , Erhan assume that the controller knows both the machine status and the current number of jobs in the system into account the machine's degradation status, such control decisions are known as predictive maintenance

  16. Constructing Bayesiannetwork Models of Software Testing and Maintenance Uncertainties

    E-Print Network [OSTI]

    Ziv, Hadar

    Constructing Bayesian­network Models of Software Testing and Maintenance Uncertainties To appear, Software requirements, Software test­ ing, Software maintenance 1 #12; 1 Introduction Development­to­market constraints. In real­life software projects, testing is often done after coding is complete, does

  17. Maintenance Approaches For ARIES-CS Power Core

    E-Print Network [OSTI]

    California at San Diego, University of

    of Fusion Energy September 14-16, 2004 Madison, WI #12;2 Outline Introduction Reactor parameters Maintenance Team aUniversity of California, San Diego, 9500 Gilman Drive, La Jolla, CA 92093, USA bFusion Nuclear and blanket designs best suited for a compact stellarator configuration. Three possible maintenance schemes

  18. Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1

    E-Print Network [OSTI]

    Hill, Jeffrey E.

    AE26 Maintenance Guide for Greenhouse Ventilation, Evaporative Cooling Heating Systems1 D. E and preventive maintenance procedures for ventilation, evaporative cooling and heating systems. Ventilation a ventilation system is not operating properly, the results can be pockets of stagnant air, inadequate cooling

  19. Aligning Software Maintenance to the Offshore Reality Christian Seybold

    E-Print Network [OSTI]

    Keller, Rudolf K.

    Aligning Software Maintenance to the Offshore Reality Christian Seybold Zühlke Engineering AG and ubiquity of software mainte- nance is continuously growing. Another more recent trend is to "offshore found in offshore cooperations. This paper reports on a software maintenance pro- ject in the power

  20. Rapid Detection of Maintenance Induced Changes in Service Performance

    E-Print Network [OSTI]

    Greenberg, Albert

    - plicated interactions across devices or software. During a maintenance activity, the Operations team is reRapid Detection of Maintenance Induced Changes in Service Performance Ajay Mahimkar , Zihui Ge ­ Research AT&T, Inc. The University of Texas at Austin § ABSTRACT Service quality in operational IP

  1. Machine Maintenance with Workload Considerations David L. Kaufman

    E-Print Network [OSTI]

    Lewis, Mark E.

    of questions related to maintenance when the decision-maker has access to operating information and the machineMachine Maintenance with Workload Considerations David L. Kaufman Department of Industrial-383-5103 Mark E. Lewis School of Operations Research and Information Engineering Cornell University 226 Rhodes

  2. Optimal Maintenance Scheduling of a Gas Engine Power Plant

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    premature aging and failure of generators leading to unplanned and costly power outages, it is important separately to reduce the manpower requirement. The maintenance scheduling of generators in power systems of these function adversely20 . In traditional power systems, the maintenance scheduling of generator units

  3. Scheduling Planned Maintenance of Electrical Power Transmission Networks Using

    E-Print Network [OSTI]

    Fernandez, Thomas

    Scheduling Planned Maintenance of Electrical Power Transmission Networks Using Genetic Algorithms Technical Report: CSRP­97­26 10 November 1997 Abstract The maintenance of the electrical power transmission Plan­ ning, Electricity Transmission Networks. 1 To appear in In Gennady K. Voronovsky and Serguey A

  4. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  5. Planning and Reporting for Operations and Maintenance in Federal Energy Savings Performance Contracts

    E-Print Network [OSTI]

    Kumar, Satish; Webster, Lia

    2005-01-01

    Prepared by: Operations and Maintenance Working GroupESPCs), operation and maintenance (O&M) is critical to1.1 Overview of Operations and Maintenance Issues in Energy

  6. LineVISAR. A fringe-trace data analysis program

    SciTech Connect (OSTI)

    Furnish, Michael D.

    2014-02-01

    The line-imaging ORVIS or VISAR provides velocity as a function of position and time for a line on an experimental setup via a streak camera record of interference fringes. This document describes a Matlab-based program which guides the user through the process of converting these fringe data to a velocity surface. The data reduction is of the "fringe trace" type, wherein the changes in velocity at a given position on the line are calculated based on fringe motion past that point. The analyst must establish the fringe behavior up front, aided by peak-finding routines in the program. However, the later work of using fringe jumps to compensate for phase problems in other analysis techniques is greatly reduced. This program is not a standard GUI construction, and is prescriptive. At various points it saves the progress, allowing later restarts from those points.

  7. Lassoing Line Outages in the Smart Power Grid

    E-Print Network [OSTI]

    Zhu, Hao

    2011-01-01

    Fast and accurate unveiling of power line outages is of paramount importance not only for preventing faults that may lead to blackouts, but also for routine monitoring and control tasks of the smart grid, including state estimation and optimal power flow. Existing approaches are either challenged by the \\emph{combinatorial complexity} issues involved, and are thus limited to identifying single- and double-line outages; or, they invoke less pragmatic assumptions such as \\emph{conditionally independent} phasor angle measurements available across the grid. Using only a subset of voltage phasor angle data, the present paper develops a near real-time algorithm for identifying multiple line outages at the affordable complexity of solving a quadratic program via block coordinate descent iterations. The novel approach relies on reformulating the DC linear power flow model as a \\emph{sparse} overcomplete expansion, and leveraging contemporary advances in compressive sampling and variable selection using the least-abso...

  8. Maintenance study for W-340 Waste Retrieval System

    SciTech Connect (OSTI)

    Christensen, C.; Conner, C.C.; Sekot, J.P.

    1994-05-01

    This study was performed to identify attributes and maintainability requirements for the Tank Waste Retrieval System (TWRS). The system will be developed for Westinghouse Hanford Company in Richland, Washington, as an integrated system to perform waste removal in Tank C-106 and, thus, demonstrate technologies for tank remediation that will satisfy requirements of the Tri-Party Agreement. The study examines attributes of the TWRS, scope of maintenance operations required for the TWRS, maintenance requirements, and potential methods of performing maintenance functions. Recommendations are provided for consideration in the development of both the conceptual design and performance specification, which will be used in procuring the W-340 Waste Retrieval System.

  9. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  10. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  11. EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance, and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability. Phase 2 of this project is detailed in EIS-0129.

  12. DOE-TSPP-9, Maintenance of DOE Technical Standards - August 1...

    Energy Savers [EERE]

    DOE-TSPP-9, Maintenance of DOE Technical Standards - August 1, 2000 DOE-TSPP-9, Maintenance of DOE Technical Standards - August 1, 2000 Technical Standards Program Procedures...

  13. Electric Motor Maintenance & Repair for Long Term Efficiency 

    E-Print Network [OSTI]

    Brithinee, W. P.

    1997-01-01

    department, for example) may use microprocessor-based devices (for logic control); power electronics (for motor speed control); and specially-built electric motors. These devices may require different maintenance procedures than the equipment used in the past...

  14. Maintenance-based design of concrete parking structures

    E-Print Network [OSTI]

    Stoakes, Christopher D. (Christopher David)

    2007-01-01

    The purpose of this study is to determine what type of preventative maintenance for a concrete parking structure will produce the maximum economic benefit. Existing models for concrete deterioration are analyzed for their ...

  15. Pre-conceptual Design Assessment of DEMO Remote Maintenance

    E-Print Network [OSTI]

    Loving, A; Sykes, N; Iglesias, D; Coleman, M; Thomas, J; Harman, J; Fischer, U; Sanz, J; Siuko, M; Mittwollen, M; others,

    2013-01-01

    EDFA, as part of the Power Plant Physics and Technology programme, has been working on the pre-conceptual design of a Demonstration Power Plant (DEMO). As part of this programme, a review of the remote maintenance strategy considered maintenance solutions compatible with expected environmental conditions, whilst showing potential for meeting the plant availability targets. A key finding was that, for practical purposes, the expected radiation levels prohibit the use of complex remote handling operations to replace the first wall. In 2012/13, these remote maintenance activities were further extended, providing an insight into the requirements, constraints and challenges. In particular, the assessment of blanket and divertor maintenance, in light of the expected radiation conditions and availability, has elaborated the need for a very different approach from that of ITER. This activity has produced some very informative virtual reality simulations of the blanket segments and pipe removal that are exceptionally ...

  16. Open source software development and maintenance: an exploratory analysis 

    E-Print Network [OSTI]

    Raja, Uzma

    2009-06-02

    The purpose of this research was to create measures and models for the evaluation of Open Source Software (OSS) projects. An exploratory analysis of the development and maintenance processes in OSS was conducted for this purpose. Data mining...

  17. Gas Turbine Technology, Part B: Components, Operations and Maintenance 

    E-Print Network [OSTI]

    Meher-Homji, C. B.; Focke, A. B.

    1985-01-01

    This paper builds on Part A and discusses the hardware involved in gas turbines as well as operations and maintenance aspects pertinent to cogeneration plants. Different categories of gas turbines are reviewed such as heavy duty aeroderivative...

  18. Maintenance Guide for DOE Low-Level Waste Disposal Facility

    Office of Environmental Management (EM)

    for use with DOE M 435.1-1 Maintenance Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Performance Assessments and Composite Analyses U.S. DEPARTMENT OF...

  19. Method and computer program product for maintenance and modernization backlogging

    DOE Patents [OSTI]

    Mattimore, Bernard G; Reynolds, Paul E; Farrell, Jill M

    2013-02-19

    According to one embodiment, a computer program product for determining future facility conditions includes a computer readable medium having computer readable program code stored therein. The computer readable program code includes computer readable program code for calculating a time period specific maintenance cost, for calculating a time period specific modernization factor, and for calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. In another embodiment, a computer-implemented method for calculating future facility conditions includes calculating a time period specific maintenance cost, calculating a time period specific modernization factor, and calculating a time period specific backlog factor. Future facility conditions equal the time period specific maintenance cost plus the time period specific modernization factor plus the time period specific backlog factor. Other embodiments are also presented.

  20. Deployment and coverage maintenance in mobile sensor networks 

    E-Print Network [OSTI]

    Lee, Jaeyong

    2009-05-15

    with constant d : : : : : : : : : : : : : : : : : : 50 24 Coverage maintenance with time varying d : : : : : : : : : : : : : : : : 51 25 Fraction of the covered area for two cases : : : : : : : : : : : : : : : : : 52 26 Mobile robot base: Rex-12 from Zagros...

  1. Stormwater Quality Management: Evaluation, Optimization, and Maintenance ORIT KALMAN

    E-Print Network [OSTI]

    Lund, Jay R.

    i Stormwater Quality Management: Evaluation, Optimization, and Maintenance BY ORIT KALMAN B are preserved. Four types of evaluation methods are reviewed: chemical and physical pollution control, biological character and processes of the receiving water, ecological health of the receiving water

  2. Long-Term Surveillance Operations and Maintenance Fiscal Year...

    Energy Savers [EERE]

    3 Year-End Summary Report Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report LTS-O&M is at the core of LM efforts to fulfill a strategy that...

  3. Energy Savings with Computerized Steam Trap Maintenance Program 

    E-Print Network [OSTI]

    Klidzejs, A. M.

    1994-01-01

    This paper describes the efforts made at 3M Company plants to save energy in the steam distribution system by improving the maintenance of steam traps. The results from steam trap surveys for 17 facilities with over 6,400 ...

  4. Gas characterization system operation, maintenance, and calibration plan

    SciTech Connect (OSTI)

    Tate, D.D.

    1996-03-04

    This document details the responsibilities and requirements for operation, maintenance, and calibration of the Gas Characterization Systems (GCS) analytical instrumentation. It further, defines the division of responsibility between the Characterization Monitoring Development organization and Tank Farms Operations.

  5. Energy Conservation Thru Steam Trap Surveys and Preventive Maintenance Programs 

    E-Print Network [OSTI]

    Boynton, T.; Dewhirst, B.

    1980-01-01

    justification for the survey program. Defective steam traps and their energy characteristics will also be discussed. An on-going preventive maintenance program can be initiated from the information derived from the survey. Sustained energy efficiency...

  6. Evaluation of Routine Atmospheric Sounding Measurements using Unmanned Systems (ERASMUS) Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantity ofkandz-cm11 Outreach Home Room NewsInformation Current HABFES October 27th,EnvironmentalEqual7/31/2016Routine Atmospheric8

  7. Assessment of Bridge Inspection and Maintenance in the United States

    E-Print Network [OSTI]

    Kwok, Kin Yip George

    2009-01-01

    (Pennsylvania Department of Transportation, 2008). Pennsylvania DOT has its own special bridge maintenance manual and special maintenance plan for stone arch bridges as shown in Figure 2.9 (Pennsylvania Department of Transportation, 2008). Figure 2... bridges. Requires lead training and monitoring for workers. EPA; Resource Conservation and Recovery Act (RCRA ) Regulates the handling, storage, and disposal of lead (and other heavy metals) containing waste. Can increase the cost of disposal...

  8. Coherent soliton communication lines

    SciTech Connect (OSTI)

    Yushko, O. V. Redyuk, A. A.; Fedoruk, M. P.; Turitsyn, S. K.

    2014-11-15

    The data transmission in coherent fiber-optical communication lines using solitons with a variable phase is studied. It is shown that nonlinear coherent structures (solitons) can be applied for effective signal transmission over a long distance using amplitude and optical-phase keying of information. The optimum ratio of the pulse width to the bit slot at which the spectral efficiency (transmitted bits per second and hertz) is maximal is determined. It is shown that soliton fiber-optical communication lines can ensure data transmission at a higher spectral efficiency as compared to traditional communication lines and at a high signal-to-noise ratio.

  9. Technical Insights for Saltstone PA Maintenance

    SciTech Connect (OSTI)

    Flach, G.; Sarkar, S.; Mahadevan, S.; Kosson, D.

    2011-07-20

    The Cementitious Barriers Partnership (CBP) is a collaborative program sponsored by the US DOE Office of Waste Processing. The objective of the CBP is to develop a set of computational tools to improve understanding and prediction of the long-term structural, hydraulic, and chemical performance of cementitious barriers and waste forms used in nuclear applications. CBP tools are expected to better characterize and reduce the uncertainties of current methodologies for assessing cementitious barrier performance and increase the consistency and transparency of the assessment process, as the five-year program progresses. In September 2009, entering its second year of funded effort, the CBP sought opportunities to provide near-term tangible support to DOE Performance Assessments (PAs). The Savannah River Saltstone Disposal Facility (SDF) was selected for the initial PA support effort because (1) cementitious waste forms and barriers play a prominent role in the performance of the facility, (2) certain important long-term behaviors of cementitious materials composing the facility are uncertain, (3) review of the SDF PA by external stakeholders is ongoing, and (4) the DOE contractor responsible for the SDF PA is open to receiving technical assistance from the CBP. A review of the current (SRR Closure & Waste Disposal Authority 2009) and prior Saltstone PAs (e.g., Cook et al. 2005) suggested five potential opportunities for improving predictions. The candidate topics considered were (1) concrete degradation from external sulfate attack, (2) impact of atmospheric exposure to concrete and grout before closure, such as accelerated slag and Tc-99 oxidation, (3) mechanistic prediction of geochemical conditions, (4) concrete degradation from rebar corrosion due to carbonation, and (5) early age cracking from drying and/or thermal shrinkage. The candidate topics were down-selected considering the feasibility of addressing each issue within approximately six months, and compatibility with existing CBP expertise and already-planned activities. Based on these criteria, the five original topics were down-selected to two: external sulfate attack and mechanistic geochemical prediction. For each of the selected topics, the CBP communicated with the PA analysts and subject matter experts at Savannah River to acquire input data specific to the Saltstone facility and related laboratory experiments. Simulations and analyses were performed for both topics using STADIUM (SIMCO 2008), LeachXS/ORCHESTRA (ECN 2007, Meeussen 2003), and other software tools. These supplemental CBP analyses produced valuable technical insights that can be used to strengthen the Saltstone PA using the ongoing PA maintenance process. This report in part summarizes key information gleaned from more comprehensive documents prepared by Sarkar et al. (2010), Samson (2010), and Sarkar (2010).

  10. Power line detection system

    DOE Patents [OSTI]

    Latorre, V.R.; Watwood, D.B.

    1994-09-27

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

  11. Improving DOE-2's RESYS routine: User defined functions to provide more accurate part load energy use and humidity predictions

    E-Print Network [OSTI]

    Henderson, Hugh I.; Parker, Danny; Huang, Yu J.

    2000-01-01

    Hirsch & Associates. 1993. DOE-2 SUPPLEMENT, VERSION 2.1e.LBL34947. November DOE 1979. Test procedures for central airin the Proceedings. Improving DOE-2's RESYS Routine: User

  12. Effect of shot type, task difficulty and research environment on consistency of pre-performance routines in golf 

    E-Print Network [OSTI]

    Cotterill, Stewart T

    2007-01-01

    Golfers have been encouraged to develop consistent pre-performance routines (PPRs) in order to enhance their performance. However, the theoretical underpinning of these recommendations is unclear. Issues relating to the ...

  13. Career opportunities Dental hygiene is routinely listed as one of today's top-ten career fields, offering

    E-Print Network [OSTI]

    Career opportunities Dental hygiene is routinely listed as one of today's top-ten career fields College English I 3 College English II 3 College Algebra 3 Public Speaking 3 Intro to Chemistry 5 Intro

  14. Standard test method for corrosion of low-embrittling cadmium plate by aircraft maintenance chemicals

    E-Print Network [OSTI]

    American Society for Testing and Materials. Philadelphia

    2008-01-01

    Standard test method for corrosion of low-embrittling cadmium plate by aircraft maintenance chemicals

  15. LANSCE Vacuum System Refurbishment Plan and Vacuum Alert System Improvements for Predictive Maintenance

    E-Print Network [OSTI]

    Tajima, T; Canabal, A; Chamberlin, J P; Harrison, S; Olivas, F R; Oothoudt, M A

    2008-01-01

    LANSCE Vacuum System Refurbishment Plan and Vacuum Alert System Improvements for Predictive Maintenance

  16. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  17. ADDRESSING “BEHIND THE SCENES” ECOLOGICAL CONCERNS ASSOCIATED WITH THE DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF AN URBAN TRANSPORTATION SYSTEM– A NEW YORK CITY TRANSIT PERSPECTIVE ON SUSTAINABILITY

    E-Print Network [OSTI]

    Singh, Ajay; Ramdahin, Dennis; Topielski, Bogdan; Raman, Ramesh Raman

    2003-01-01

    DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE OF AN URBANprocurement and operations and maintenance activities. This

  18. Application of Standard Maintenance Windows in PHWR Outage

    SciTech Connect (OSTI)

    Fuming Jiang [Third Qinshan Nuclear Power Company, Ltd. (China)

    2006-07-01

    The concept of Standard Maintenance Windows has been widely used in the planned outage of light water reactor in the world. However, due to the specific feature of Pressurized Heavy Water Reactor (PHWR), it has not come to a consensus for the PHWR owners to adopt Standard Maintenance Windows for planned outage aiming at the optimization of outage duration. Third Qinshan Nuclear Power Company (TQNPC), with their experience gained in the previous outages and with reference to other PHWR power plants, has identified a set of Standard Maintenance Windows for planned outage. It can be applied to similar PHWR plants and with a few windows that are specific to Qinshan Phase III NPP. The use of these Standard Maintenance Windows in planned outage has been proved to be effective in control shutdown nuclear safety, minimize the unavailability of safety system, improve the efficient utilization of outage duration, and improved the flexibility of outage schedule in the case of emergency issue, which forced the revision of outage schedule. It has also formed a solid foundation for benchmarking. The identification of Standard Maintenance Windows and its application will be discussed with relevant cases for the common improvement of outage duration. (author)

  19. Politics of schism: routinization and social control in the International Socialists/Socialist Workers' Party

    SciTech Connect (OSTI)

    Rayner, S.

    1985-01-01

    The received wisdom of social science holds that voluntary organizations founded on egalitarian principles, can only survive by undergoing transformation into hierarchical systems. The underlying logic of Weber, Michels and Toennies' descriptions is that social organizations sustain themselves over time by generating increasingly complex systems of rules that become sources of inequality. This article argues that routinization in voluntary groups does not consist of a gradual accumulation of rules that promote internal inequality. Instead, two analytically distinct steps are proposed: (1) construction of a distinctive organizational boundary, which is a necessary condition for (2) the ultimate imposition of a complex organizational hierarchy. The case used to illustrate this argument is drawn from the history of the British Trotskyist movement prior to 1978. The argument itself is framed within a formal model of the sociology of knowledge called grid/group analysis.

  20. Nuclear Systems Enhanced Performance Program, Maintenance Cycle Extension in Advanced Light Water Reactor Design

    SciTech Connect (OSTI)

    Professor Neill Todreas

    2001-10-01

    A renewed interest in new nuclear power generation in the US has spurred interest in developing advanced reactors with features which will address the public's concerns regarding nuclear generation. However, it is economic performance which will dictate whether any new orders for these plants will materialize. Economic performance is, to a great extent, improved by maximizing the time that the plant is on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Indeed, the strategy for the advanced light water reactor plant IRIS (International Reactor, Innovative and Secure) is to utilize an eight year operating cycle. This report describes a formalized strategy to address, during the design phase, the maintenance-related barriers to an extended operating cycle. The top-level objective of this investigation was to develop a methodology for injecting component and system maintainability issues into the reactor plant design process to overcome these barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the IRIS design. The first step in meeting the top-level objective was to determine the types of operating cycle length barriers that the IRIS design team is likely to face. Evaluation of previously identified regulatory and investment protection surveillance program barriers preventing a candidate operating PWR from achieving an extended (48 month) cycle was conducted in the context of the IRIS design. From this analysis, 54 known IRIS operating cycle length barriers were identified. The resolution methodology was applied to each of these barriers to generate design solution alternatives for consideration in the IRIS design. The methodology developed has been demonstrated to narrow the design space to feasible design solutions which enable a desired operating cycle length, yet is general enough to have broad applicability. Feedback from the IRIS design team indicates that the proposed solutions to the investigated operating cycle length barriers are both feasible and consistent with sound design practice.

  1. Computerized asset management and maintenance systems in ST

    E-Print Network [OSTI]

    Sánchez-Corral, E

    1999-01-01

    The ST division manages and therefore maintains the CERN technical installations. A maintenance database application exists for every technical domain. A total of six different databases were built during the last 10 years and are based on the RAPIER maintenance program. As the Computerized Asset Management and Maintenance Systems (CAMMS) technology has evolved, the RAPIER system has become obsolete. Therefore we are forced to migrate to its latest version, MP5, before the year 2000. The migration path must be defined, leading from the current situation to a fully operational MP5 application. The major elements of each migration path consist in determining the functionality to use, defining the operation of it, adapting and/or creating procedures, converting data and providing training. A migration is always a process of change. The migration presents a unique opportunity to evaluate the current implementations, adapt them to the requirements and exploit the new features offered. Obsolete data and inconsisten...

  2. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  3. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  4. Resource Efficient Maintenance of Wireless Network Topologies1

    E-Print Network [OSTI]

    Schindelhauer, Christian

    Resource Efficient Maintenance of Wireless Network Topologies1 Tam´as Lukovszki Faculty: Multiple hop routing in mobile ad hoc networks can minimize energy con- sumption and increase data) interferences and whether these basic networks provide energy-optimal or congestion-minimal routing. Then, we

  5. Low-level waste vitrification contact maintenance viability study

    SciTech Connect (OSTI)

    Leach, C.E., Westinghouse Hanford

    1996-07-12

    This study investigates the economic viability of contact maintenance in the Low-Level Waste Vitrification Facility, which is part of the Hanford Site Tank Waste Remediation System. This document was prepared by Flour Daniel, Inc., and transmitted to Westinghouse Hanford Company in September 1995.

  6. Towards Scalable Monitoring and Maintenance of Rechargeable Batteries

    E-Print Network [OSTI]

    Zambreno, Joseph A.

    Towards Scalable Monitoring and Maintenance of Rechargeable Batteries Aaron Mills, Joseph Zambreno}@iastate.edu Abstract--Current research on State-of-Charge (SOC) track- ing for rechargeable batteries focuses primarily on analyzing batteries consisting of a single cell, or otherwise treat a set of series-connected cells

  7. Materialized View Selection and Maintenance Using Multi-Query Optimization

    E-Print Network [OSTI]

    Ramamritham, Krithi

    Materialized View Selection and Maintenance Using Multi-Query Optimization Hoshi Mistry ¡ Prasan the differentials as above. Our work addresses the problem of optimizing the main- tenance of a set of materialized Materialized views have been found to be very effective at speeding up queries, and are increasingly being

  8. Maintenance and Operations of Schools for Energy Efficiency 

    E-Print Network [OSTI]

    McClure, J. D.; Estes, J. M.

    1986-01-01

    Maintenance and operations of schools with energy efficiency as a priority can reduce annual utility costs 3 to 30 percent. Most school districts do not have an organized plan for tracking energy usage or cost. Energy performance (e.g. Btu/ft^2-yr...

  9. Establishing an In-House Wind Maintenance Program

    SciTech Connect (OSTI)

    2011-12-01

    Update to the 2008 guidebook titled “Establishing an In-house Wind Maintenance Program”, which was developed to support utilities in developing O&M strategies. This update includes significant contributions from utilities and other stakeholders around the country, representing all perspectives and regardless of whether or not they own wind turbines or projects.

  10. Operation and maintenance considerations for waste-to-energy systems

    SciTech Connect (OSTI)

    Cross, F.; O'Leary, P.; Walsh, P.

    1987-08-01

    In this article, the author discusses environmental and safety issues surrounding waste-to-energy systems. A facility can be safe and compatible with the surrounding community if management has an ethic to provide for the disposal of refuse in an economic, safe, and environmentally sound manner and the operator is trained in the proper procedures for facility operation, maintenance, troubleshooting and repair.

  11. Optimal Maintenance Scheduling of a Gas Engine Power Plant

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    1 Optimal Maintenance Scheduling of a Gas Engine Power Plant Pedro M. Castro Ignacio E. Grossmann MILP starting from GDP model September 4-5 2EWO Fall Meeting 2013 Problem statement · Gas Engine Power Plant Project in Sasolburg (SGEPP) ­ 18 identical gas engines consuming natural gas & producing

  12. Optimal Maintenance Scheduling of a Power Plant with Seasonal

    E-Print Network [OSTI]

    Grossmann, Ignacio E.

    hours for periods with high electricity tariff Sasolburg Gas Engine Power Plant 18 Wärtsila 34 SG statement · Gas engine power plant ­ 18 identical engines with generation capacity = 10 MW ­ Only 1Optimal Maintenance Scheduling of a Power Plant with Seasonal Electricity Tariffs Pedro M. Castro

  13. Efficient Coverage Maintenance Based on Probabilistic Distributed Detection

    E-Print Network [OSTI]

    Lu, Chenyang

    sufficient sensing coverage over long periods of time. To conserve energy, a coverage maintenance protocol.e., probabilistic detection by individual sensors and data fusion among sensors. We then present three coverage fusion groups, but increases the number of active sensors due to the lack of collaboration among sensors

  14. Clustering Static Analysis Defect Reports to Reduce Maintenance Costs

    E-Print Network [OSTI]

    Weimer, Westley

    Clustering Static Analysis Defect Reports to Reduce Maintenance Costs Zachary P. Fry and Westley, for large systems, these tools often produce an overwhelming number of defect reports. Many of these defect reports are conceptually similar, but addressing each report separately costs developer effort

  15. Analysis of Preventive Maintenance in Transactions Based Software Systems

    E-Print Network [OSTI]

    Telek, Miklós

    the current growth in software complexity and reuse, the trend is not likely to change. It is also well knownAnalysis of Preventive Maintenance in Transactions Based Software Systems Sachin Garg 1 , Antonio of Electrical Engineering, Duke University Durham, NC 27708­0291 ­ USA E­mail: fsgarg,kstg@ee.duke.edu URL: http

  16. IEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind

    E-Print Network [OSTI]

    Ntaimo, Lewis

    conditions. In-situ sensors installed at wind turbines produce useful information about the physical guidelines that reduces the repair costs and increases the marketability of wind energy generation. #12;IEEEIEEE TRANSACTIONS ON RELIABILITY 1 Optimal Maintenance Strategies for Wind Turbine Systems Under

  17. Local Monitoring and Maintenance for Operational Wireless Sensor Networks

    E-Print Network [OSTI]

    Wu, Jie

    a wireless sensor network (WSN) is to monitor the network itself. Many ex- isting approaches perform centralized analysis and maintenance based on a large amount of status reports collected from the WSN, while the normal operations of targeted WSN applications. Unlike existing work, we propose LoMoM, a new approach

  18. MAINTENANCE, UPGRADE AND VERIFICATION OF OPERATIONAL FORECASTS OF

    E-Print Network [OSTI]

    MAINTENANCE, UPGRADE AND VERIFICATION OF OPERATIONAL FORECASTS OF CLOUD COVER AND WATER VAPOUR Purchase Order 58311/ODG/99/8362/GWI/LET #12;i PREFACE Starting in August 1998, operational forecasts satellite imagery from the Co-operative Institute for Research in the Atmosphere (CIRA) and upper

  19. SECTION 9-DRIVER SAFETY PROGRAM AND VEHICLE OPERATION/ AND MAINTENANCE

    E-Print Network [OSTI]

    Selmic, Sandra

    SECTION 9- DRIVER SAFETY PROGRAM AND VEHICLE OPERATION/ AND MAINTENANCE INTRODUCTION Driving, driving statistically exposes you to the single greatest degree of risk in your everyday life. The driving in a vehicular accident while conducting State business. · Make recommendations on how to operate a vehicle

  20. Probabilistic Failure Detection for Efficient Distributed Storage Maintenance* , Zhi Yang*

    E-Print Network [OSTI]

    Almeroth, Kevin C.

    avail- ability. Node failures can be transient or permanent. While the system must generate new replicasProbabilistic Failure Detection for Efficient Distributed Storage Maintenance* Jing Tian* , Zhi@cs.ucsb.edu Abstract Distributed storage systems often use data replica- tion to mask failures and guarantee high data

  1. Dynamic Genomes of Eukaryotes and the Maintenance of Genomic Integrity

    E-Print Network [OSTI]

    Katz, Laura

    Dynamic Genomes of Eukaryotes and the Maintenance of Genomic Integrity Eukaryotes specify a genome to be inherited stably, enabling dynamic rearrangements and amplifications of other genomic elements Laura Wegener Parfrey and Laura A. Katz M any biologists assume that eu- karyotic genomes are transmit- ted stably

  2. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  3. Routine environmental audit of the Sandia National Laboratories, California, Livermore, California

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This report documents the results of the Routine Environmental Audit of the Sandia National Laboratories, Livermore, California (SNL/CA). During this audit the activities the Audit Team conducted included reviews of internal documents and reports from preview audits and assessments; interviews with US Department of Energy (DOE), State of California regulators, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted from February 22 through March 4, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety, and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements. The audit`s functional scope was comprehensive and included all areas of environmental management and a programmatic evaluation of NEPA and inactive waste sites.

  4. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    NONE

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  5. RFI Seeks Feedback on Third-party Maintenance Strategy for AMO...

    Energy Savers [EERE]

    RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools RFI Seeks Feedback on Third-party Maintenance Strategy for AMO's Software Tools July 28, 2014 -...

  6. Data quality assurance and performance measurement of data mining for preventive maintenance of power grid

    E-Print Network [OSTI]

    Wu, Leon

    2011-01-01

    Ensuring reliability as the electrical grid morphs into the "smart grid" will require innovations in how we assess the state of the grid, for the purpose of proactive maintenance, rather than reactive maintenance; in the ...

  7. Evaluating the Effectiveness of Illustrative Visualization of Schematic Diagrams for Maintenance Tasks

    E-Print Network [OSTI]

    Maciejewski, Ross

    Evaluating the Effectiveness of Illustrative Visualization of Schematic Diagrams for Maintenance Thomas Purdue University Rendering and Perceptualization Laboratory Aviation Technology, Purdue University Air Force Research Laboratory Abstract In order to perform daily maintenance and repair tasks

  8. Policy #1001 Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY

    E-Print Network [OSTI]

    Policy #1001 ­ Development, Approval and Maintenance of University Policy 1 OLD DOMINION UNIVERSITY University Policy Policy #1001 DEVELOPMENT, APPROVAL AND MAINTENANCE OF UNIVERSITY POLICY Responsible 4, 2012 A. PURPOSE This policy defines the process for developing, reviewing, approving

  9. Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A Lamps Operated in Steady-State Conditions Retail Lamps Study 3.2: Lumen and Chromaticity Maintenance of LED A...

  10. Automated ground maintenance and health management for autonomous unmanned aerial vehicles

    E-Print Network [OSTI]

    Dale, Daniel R., M. Eng. Massachusetts Institute of Technology

    2007-01-01

    Automated ground maintenance is a necessity for multi-UAV systems. Without such automation, these systems will become more of a burden than a benefit as human operators struggle to contend with maintenance operations for ...

  11. Project Profile: Maintenance-Free Stirling Engine for High-Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Maintenance-Free Stirling Engine for High-Performance Dish CSP Project Profile: Maintenance-Free Stirling Engine for High-Performance Dish CSP Image of a prototype 30-kW Stirling...

  12. Holes in Spectral Lines

    E-Print Network [OSTI]

    Fontana, Peter R.; Srivastava, Rajendra P.

    1973-06-01

    at E = 0 is 2le I' Ib/(t)I = @~ R~R~~»nh'(IRlyt)e"'" (13)a ylal 0 5 '7 FIG. 3. Probabilities of photon emission as a function of time. The frequency corresponds to the energy differ- ence between the unperturbed degenerate excited states and the ground... states 6 is 0. 5 ey. For V= 0 the emission line is Lorentzian, but for V0 a "hole" appears at the frequency equal to the frequency difference between the excited nondecay- ing state and the ground state. The position of the "hole" is independent...

  13. The Line Verifier GVERIFY1

    E-Print Network [OSTI]

    Griffith, Arnold K.

    1971-01-01

    A line verifier is presented which, given the co-ordinates of the end points of the hypothesized line, returns a (possibly) more accurate version of the end points, together with an estimate of the probability that there ...

  14. Transmission Line Circuit Alexander Glasser

    E-Print Network [OSTI]

    Anlage, Steven

    Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

  15. ANNUAL REPORT TO CONGRESS STATUS OF THE HARBOR MAINTENANCE TRUST FUND

    E-Print Network [OSTI]

    US Army Corps of Engineers

    ANNUAL REPORT TO CONGRESS STATUS OF THE HARBOR MAINTENANCE TRUST FUND FISCAL YEARS 2000, 2001 AND 2002 #12;ii #12;iii ANNUAL REPORT TO CONGRESS STATUS OF THE HARBOR MAINTENANCE TRUST FUND FISCAL YEARS, Fiscal Year 2002 (Actual, $000) #12;vi #12;vii ANNUAL REPORT TO CONGRESS STATUS OF THE HARBOR MAINTENANCE

  16. Maintenance Efficient Routing in Wireless Sensor Networks Andre Barroso, Utz Roedig and Cormac Sreenan

    E-Print Network [OSTI]

    Sreenan, Cormac J.

    of maintenance operations in a sensor field is essentially dependent on the way nodes are de- pleted. Given- tive definition of a maintenance operation as the replace- ment of batteries from one or more nodes of evaluating the impact of routing pro- tocols in the maintenance operations also requires the as- sumption

  17. Comparison of Maintenance Cost, Labor Demands, and System Performance for LID and Conventional

    E-Print Network [OSTI]

    operations and maintenance. Due to increasing require- ments for more effective treatment of runoff examined seven different types of SCMs for the first 2­4 years of operations and studied maintenance; Maintenance; Cost; LID; Operation; Stormwater; Labor; Water quality; Expenses. Introduction

  18. A Comparison of Maintenance Cost, Labor Demands, and System Performance for LID and Conventional Stormwater Management

    E-Print Network [OSTI]

    operations and maintenance. Due to increasing requirements for more effective treatment of runoff examined seven different types of SCMs for the first 2-4 years of operations and studied maintenanceAccepted M anuscript N otC opyedited 1 A Comparison of Maintenance Cost, Labor Demands, and System

  19. Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and

    E-Print Network [OSTI]

    Weber, Stefan

    and maintenance operations for a capacitated resource facing a dynamic demand for different types of products operations for the remaining time in between the maintenance activities. Many practitioners and academics as different forms of interaction between maintenance and setup operations. The lot-sizing part of our generic

  20. Lead Management Program for Building Maintenance and Construction Projects Office of Environmental Health and Safety

    E-Print Network [OSTI]

    Chan, Hue Sun

    )F & S 8 3.2.3 MANAGERS, MECHANICAL OPERATIONS AND MAINTENANCE 9 3.2.4 PROPERTY MANAGERS 10 3.2.5 MANAGERLead Management Program for Building Maintenance and Construction Projects Office of Environmental Maintenance and Construction Projects Page 2 of 22 UNIVERSITY OF TORONTO ­ Office of Environmental Health

  1. Data-driven minimization of pump operating and maintenance cost Zijun Zhang a,n

    E-Print Network [OSTI]

    Kusiak, Andrew

    Data-driven minimization of pump operating and maintenance cost Zijun Zhang a,n , Xiaofei He b the cost of pump operations and maintenance. A neural network algorithm is applied to model performance research seldom considered the interaction between the operation and maintenance scheduling as well

  2. 7/26/02 /home/lml/frame/hardware/EWGMaintenance.fm EWG Maintenance/Operation

    E-Print Network [OSTI]

    Barrash, Warren

    7/26/02 /home/lml/frame/hardware/EWGMaintenance.fm EWG Maintenance/Operation Transporting the EWG. The State of Idaho does not require a license for this trailer. Engine/Hydraulic Maintenance/Operation 1 when operating EWG. EWG Maintenance/Operation 1. Prior to each day's operation, grease hydraulic arm

  3. The maintenance of equipment painting in maritime oil platforms is an expensive and

    E-Print Network [OSTI]

    Barbosa, Alberto

    , and set dates for each maintenance, which involves a complex logistics of embarking peopleAbstract The maintenance of equipment painting in maritime oil platforms is an expensive of the maintenance of the painting of platform elements, calculating the paint areas of different equipment

  4. Using Real Options to Manage Condition-Based Maintenance Enabled by PHM

    E-Print Network [OSTI]

    Sandborn, Peter

    . PHM potentially enables performance based logistics, condition-based maintenance, and reduced lifeUsing Real Options to Manage Condition-Based Maintenance Enabled by PHM Gilbert Haddad, Peter-component; decision support system; maintenance optimization, real options; economic analysis; post

  5. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  6. Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

  7. RFEDSCHK User's Manual (The RFEDS Lab Data Check routine), Environmental and Scientific Systems Information Resources: Version 1. 00

    SciTech Connect (OSTI)

    Not Available

    1992-05-01

    The RFEDS Laboratory Data Check routine (RFEDSCHK) preforms checks of the off-site laboratory data to identify missing and/or incorrect data which may exist. The check routine is designed to assist the laboratories to correct deficiencies contained in the data before it is sent to the Rocky Flats Environmental Management Department, there-by improving the quality of the data being placed in RFEDS. If the data passes the checks with no errors, the data will be acceptable for placement into RFEDS and delivery of the electronic data to EG G is appropriate. If errors are detected, the laboratory should correct the errors and perform the check again until the data is free of errors.

  8. Plains and Eastern Clean Line Transmission Line: Federal Register...

    Energy Savers [EERE]

    Clean Line project. The project would include an overhead 600-kilovolt (kv) high voltage, direct current electric transmission system and associated facilities with the capacity to...

  9. Proposed Project: Plains & Eastern Clean Line Transmission Line...

    Energy Savers [EERE]

    & Eastern Clean Line project (the proposed project) would include an overhead +- 600 kV direct current electric transmission system and associated facilities with the capacity to...

  10. Routine metabolism and critical oxygen concentration for juvenile red drum Sciaenops ocellatus as functions of water hardness and salinity 

    E-Print Network [OSTI]

    Schlechte, John Warren

    1989-01-01

    : Dr. William H. Neill Routine metabolic rate (RMR) and cr itical oxygen concentr ation (COCR) were determined for juvenile red drum Sciaenops ocel latus acclimated to var ious combinations of water hardness (expressed as concentr ation of calcium... ion) and salinity. Treatments comprised fifteen salinity/hard- ness regimes (8, 5, 18, 28, or 35 ppt salinity by 18, 188, or 488 ppm calcium) . Three treatments had 188 / mortality during acclimation; these were 28 ppt salinity x 18 ppm calcium...

  11. ReadMe file: A user's guide for the vitality model parameter fitting routine and the S-Plus functions contained in file VitalityModelFitting.ssc.

    E-Print Network [OSTI]

    Washington at Seattle, University of

    ReadMe file: A user's guide for the vitality model parameter fitting routine and the S-Plus functions contained in file VitalityModelFitting.ssc. The VitalityModelFitting.ssc file contains all functions necessary to run the MLE parameter fitting routine for the vitality-based survival model

  12. Practical Maintenance of Digital Systems: Guidance to Maximize the Benefits of Digital Technology for the Maintenance of Digital Systems and Plant Equipment

    SciTech Connect (OSTI)

    Hill, D; Scarola, K

    2004-10-30

    This report presents detailed guidance for the maintenance and testing of modern digital systems. The guidance provides practical means for plants to take advantage of the increased diagnostic and self-test capabilities of these systems. It helps plants avoid mistakes in design and installation that could lead to increased maintenance burden and decreased system reliability and availability.

  13. Bipolar pulse forming line

    DOE Patents [OSTI]

    Rhodes, Mark A. (Pleasanton, CA)

    2008-10-21

    A bipolar pulse forming transmission line module for linear induction accelerators having first, second, third, fourth, and fifth planar conductors which form an interleaved stack with dielectric layers between the conductors. Each conductor has a first end, and a second end adjacent an acceleration axis. The first and second planar conductors are connected to each other at the second ends, the fourth and fifth planar conductors are connected to each other at the second ends, and the first and fifth planar conductors are connected to each other at the first ends via a shorting plate adjacent the first ends. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short a high voltage from the first end of the third planar conductor to the first end of the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

  14. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  15. DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE

    SciTech Connect (OSTI)

    Watkins, R.; England, J.

    2010-05-28

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

  16. ExxonMobil Olefins Plant Projects, Maintenance and Optimizations 

    E-Print Network [OSTI]

    Neely, M. M.

    2014-01-01

    Projects, Maintenance and Optimizations Matt Neely Utilities Coordinator ExxonMobil Baytown Olefins Plant 2014 IETC May 21, 2014 ESL-IE-14-05-02 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New Orleans, LA. May 20-23, 2014... Technology Conference New Orleans, LA. May 20-23, 2014 Global Energy Management System • Why is Energy Management important? – Good for the environment – Good for business • Refining and Chemicals account for more than 75% of ExxonMobil’s energy consumption...

  17. Enhancing Building Performance Through More Responsive Maintenance System 

    E-Print Network [OSTI]

    Alsudairi, A. A.

    2012-01-01

    . Logic and issues related to the simulation model will be discussed in the next section. 0 1 2 3 4 5 10 12 14 16 18 20 22 24 26 28 Time (minuets) Re lati ve Fr eq ue nc y (a) PM Activity # 11- Get Equipment distribution 0 1 2 3... in minutes of Preventive Maintenance activities. No. Task Minimum Most likely Maximum Average 1 Assign no. to each work order 5 8 12 8.17 2 Check printed PM sheet 4 8 10 7.67 3 Segregate PM sheet 2.5 4 7 4.25 4 Print PM work orders 5 10 15 10.00 5...

  18. Plant maintenance and plant life extension issue, 2007

    SciTech Connect (OSTI)

    Agnihotri, Newal (ed.)

    2007-03-15

    The focus of the March-April issue is on plant maintenance and plant life extension. Major articles/reports in this issue include: Three proposed COLs expected in 2007, by Dale E. Klein, U.S. Nuclear Regulatory Commission; Delivering behaviors that our customers value, by Jack Allen, Westinghouse Electric Company; Facilitating high-level and fuel waste disposal technologies, by Malcolm Gray, IAEA, Austria; Plant life management and long-term operation, by Pal Kovacs, OECD-NEA, France; Measuring control rod position, by R. Taymanov, K. Sapozhnikova, I. Druzhinin, D.I. Mendeleyev, Institue for Metrology, Russia; and, 'Modernization' means higher safety, by Svetlana Genova, Kozluduy NPP plc, Bulgaria.

  19. Surveillance & Maintenance: The Requirements Based Surveillance and

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on QA:QA J-E-1 SECTION J APPENDIX E LIST OF APPLICABLEStatutory Authority forPerkSupplementalMaintenance Review Process

  20. Emergency pipe line repair connects subsea pipe lines

    SciTech Connect (OSTI)

    Lerique, M.P.; Thiberge, P. ); Wright, N. )

    1990-11-01

    Emergency repair of any subsea line pipe must form a high-integrity, metal-to-metal seal. This paper presents a remote, diverless repair system that utilizes master flanges, a connector and a spool piece to repair line pipe in deep offshore waters.

  1. Bonneville Power Administration FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    built in 1941. Although routine maintenance has been performed on the line, all wood poles and wires must be replaced due to rot and deterioration. The proposed project would...

  2. Microsoft Word - PR 22 13 Kalispell-Kerr Public Meeting w photo...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in 1947. Although routine maintenance has been performed on the line, all the wood poles and conductor need to be replaced due to age and deterioration. The proposed project...

  3. Microsoft Word - PR 02 13 Salem-Albany Public Meeting.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    more than 60 years ago. Although the lines have received routine maintenance, the wood poles, wires and associated structural components are near the end of their life span and...

  4. CX-011235: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Wood Pole Inspection and Treatment - Routine Transmission Line Maintenance CX(s) Applied: B1.3 Date: 10/24/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. Microsoft Word - PR 01 13 BPA to meet with public for feedback...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    built in 1941. Although routine maintenance has been performed on the line all the wood poles and conductor need to be replaced due to rot and deterioration. The proposed project...

  6. Maintenance approaches and practices in selected foreign nuclear power programs and other US industries: Review and lessons learned

    SciTech Connect (OSTI)

    Not Available

    1990-04-01

    The Commission published a Notice of Proposed Rule-making on Maintenance of Nuclear Power Plants on November 28, 1988, spelling out NRC's expectations in maintenance. In preparing the proposed rule, the NRC reviewed maintenance practices in other countries and considered maintenance approaches in other industries in this country. As a result of the review of maintenance practices, it was concluded that certain practices in the following areas have been found to contribute significantly to effective maintenance: (1) systems approach; (2) effectiveness monitoring; (3) technician qualifications and motivation; and (4) maintenance organization. 87 refs., 26 figs., 2 tabs.

  7. Text-Alternative Version: Maintenance Practices for LED Streetlights

    Office of Energy Efficiency and Renewable Energy (EERE)

    Bruce Kinzey:So again, I want to welcome everyone to another MSSLC webinar. And we have a great one lined up today. At this point everyone is familiar with the fact that the solid-state street...

  8. Design, maintenance extend FGD system slurry valve life

    SciTech Connect (OSTI)

    LeMay, B. [St. John`s River Power Park, Jacksonville, FL (United States); Willyard, B. [Grand River Dam Authority, Chouteau, OK (United States); Polasek, S. [Lower Colorado River Authority, Austin, TX (United States); Clarkson, C.W. [Clarkson Co., Sparks, NV (United States)

    1995-08-01

    This article describes how power plants in Florida, Oklahoma and Texas adopted improved maintenance techniques and sought better design criteria to gain greater slurry valve reliability. Slurry valves, a vital part of a flue gas desulfurization (FGD) system, are critical to a power plant`s ability to meet or exceed acid rain emission requirements. The performance and reliability of these valves can significantly affect unit operation and load capacity. For example, slurry valves installed on the suction and discharge ends of scrubber tower pumps are a main point of isolation. When these valves malfunction, the scrubber tower must be shut down. Problems with valves that control the feed system and reaction tank alter slurry pH and density, and also affect unit load. In addition, a single valve that serves dual-pumping systems from the slurry storage tank to the reaction tank can cause a system outage. Because of their key role in system operation, specific maintenance approaches were developed at several power plants to improve slurry valve reliability and run times.

  9. Feasibility of in situ lining rehabilitation of small diameter heat distribution pipe

    SciTech Connect (OSTI)

    Cardenas, H.E.; Hock, V.F.; Segan, E.G. [Army Construction Engineering Research Labs., Champaign, IL (United States)

    1995-12-01

    Many pipeline rehabilitation methods are available for large pipe systems greater than 2 inches in diameter. For small internal systems with many lateral connections, the cost of these methods becomes exorbitant. This study examined the feasibility of an in situ lining rehabilitation concept for small pipelines that involves minimal surface preparation. This work addressed: testing and modification of candidate liner resins, hydraulic analysis of lining impact on pipe flow, and the life cycle cost comparison of applying a liner compared with typical plumbing maintenance practices. Analytical projections based on these analyses revealed a potential source of life cycle cost savings by applying this rehabilitation process to condensate return lines. A liner formulation involving Bisphenol-A and 1% silica addition exhibited sufficient high temperature immersion resistance to operate in a condensate return line. The mathematical liner impact model developed herein provides a qualitative representation of the liner impact on flow. Analytical findings derived from this model indicated that power savings are significantly dependent on pipe diameter and flow rate. A present worth, life cycle cost analysis revealed that if the cost of in situ rehabilitation is roughly 50% of replacement, the benefits may be revealed in terms of avoided operations, maintenance, and repair costs.

  10. EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

  11. EA-1863: Vegetation Management on the Glen Canyon-Pinnacle Peak Transmission Lines Spanning the Coconino National Forest, Coconino County, Arizona

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of updating the vegetation management and right-of-way maintenance program for Western’s Glen Canyon to Pinnacle Peak 345-kV transmission lines, which cross the Coconino National Forest, Coconino County, Arizona.

  12. Meeting with Greg Horton

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    remodeling, renovations, Maintenance and Janitorial Services * ISU manages the CAES Facility. ISU Maintenance staff will provide routine maintenance and janitorial...

  13. EA-2008: Colorado River Storage Project Programmatic Operations and Maintenance Project; Coconino, Maricopa, Navajo, and Yavapai Counties (Arizona) and San Juan County (Utah)

    Broader source: Energy.gov [DOE]

    Western Area Power Administration is preparing an EA that assesses the potential environmental impacts of Western’s programmatic operations and management (O&M) process and an integrated vegetation management (IVM) program on the Colorado River Storage Project System. O&M activities would consist of aerial and ground patrols, regular and preventive maintenance, inspections and repairs, and road repair. The IVM program would remove vegetation to protect facilities from fire, control the spread of noxious weeds to protect environmental quality, establish and maintain stable, low-growing plant communities in the ROW, and activities for public and worker safety around transmission lines and other facilities.

  14. DOE/EA-2008: Colorado River Storage Project Programmatic Operations and Maintenance Project; Coconino, Maricopa, Navajo, and Yavapai Counties (Arizona) and San Juan County (Utah)

    Broader source: Energy.gov [DOE]

    Western Area Power Administration is preparing an EA that assesses the potential environmental impacts of Western’s programmatic operations and management (O&M) process and an integrated vegetation management (IVM) program on the Colorado River Storage Project System. O&M activities would consist of aerial and ground patrols, regular and preventive maintenance, inspections and repairs, and road repair. The IVM program would remove vegetation to protect facilities from fire, control the spread of noxious weeds to protect environmental quality, establish and maintain stable, low-growing plant communities in the ROW, and activities for public and worker safety around transmission lines and other facilities.

  15. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    SciTech Connect (OSTI)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  16. Linking Building Commissioning and Operations and Maintenance Towards an Embedded Commissioning Practice 

    E-Print Network [OSTI]

    Akin, O.; Gursel, I.

    2005-01-01

    -metering and visualisation needed to better understand the end energy use, data analysis for benchmarking and correlation with operational and weather data, action management for maintenance operation support....

  17. Pulse shaping with transmission lines

    DOE Patents [OSTI]

    Wilcox, Russell B. (Oakland, CA)

    1987-01-01

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  18. Maintenance and operation of the USDOE Alternative Fuel Center

    SciTech Connect (OSTI)

    Erwin, J.; Moulton, D.S.; Hetrick, D.L. [Southwest Research Inst., San Antonio, TX (United States)] [Southwest Research Inst., San Antonio, TX (United States)

    1994-08-01

    The Alternative Fuels Utilization Program (AFUP) of the Office of Energy Efficiency and Renewable Energy has investigated the possibilities and limitations of expanded scope of fuel alternatives and replacement means for transportation fuels from alternative sources. Under the AFUP, the Alternative Fuel Center (AFC) was created to solve problems in the DOE programs that were grappling with the utilization of shale oil and coal liquids for transportation fuels. In year one of this contract, a timeline was set to coordinate uses and operations of the AFC hydrogenation pilot plant among test fuels production project work, facility maintenance, other government work, and work for industry for second-generation operations. In year two, consistent with assisting the AFUP in accomplishing its general goals, the work was done with fuel producers, regulators, and users in mind. AFC capabilities and results were disseminated through tours and outside presentations.

  19. Maintenance is the cheapest way to improve fine coal dewatering

    SciTech Connect (OSTI)

    Burger, J.

    1986-01-01

    There are a great many things that a preparation plant operator can do right now to increase fine coal dewatering effectiveness and maintenance is one of them, says Donald A. Dahlstrom, at the University of Utah. Dewatering of fine coal is increasingly important, because electricity generation, the largest coal consumer, is so strongly affected by the moisture content. Every pound of water put into a boiler raises costs about 2 1/2 cents. The heat it takes to turn water to steam and get it out the stack is heat that could have been used to generate power. In addition, there is the cost of shipping the water. You can add the freight costs to that. In contrast it costs about 1/2-cent/lb to remove the water at the preparation plant.

  20. Feasibility study for a transportation operations system cask maintenance facility

    SciTech Connect (OSTI)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the cask systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.

  1. Inertial Fusion Power Plant Concept of Operations and Maintenance

    SciTech Connect (OSTI)

    Anklam, T.; Knutson, B.; Dunne, A. M.; Kasper, J.; Sheehan, T.; Lang, D.; Roberts, V.; Mau, D.

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  2. Development of a one-stop beam verification system using electronic portal imaging devices for routine quality assurance

    SciTech Connect (OSTI)

    Lim, Sangwook; Ma, Sun Young; Jeung, Tae Sig; Yi, Byong Yong; Lee, Sang Hoon; Lee, Suk; Cho, Sam Ju; Choi, Jinho

    2012-10-01

    In this study, a computer-based system for routine quality assurance (QA) of a linear accelerator (linac) was developed by using the dosimetric properties of an amorphous silicon electronic portal imaging device (EPID). An acrylic template phantom was designed such that it could be placed on the EPID and be aligned with the light field of the collimator. After irradiation, portal images obtained from the EPID were transferred in DICOM format to a computer and analyzed using a program we developed. The symmetry, flatness, field size, and congruence of the light and radiation fields of the photon beams from the linac were verified simultaneously. To validate the QA system, the ion chamber and film (X-Omat V2; Kodak, New York, NY) measurements were compared with the EPID measurements obtained in this study. The EPID measurements agreed with the film measurements. Parameters for beams with energies of 6 MV and 15 MV were obtained daily for 1 month using this system. It was found that our QA tool using EPID could substitute for the film test, which is a time-consuming method for routine QA assessment.

  3. Assisted extraction of the energy level spacings and lever arms in direct current bias measurements of one-dimensional quantum wires, using an image recognition routine

    E-Print Network [OSTI]

    Lesage, A. A. J.; Smith, L. W.; Al-Taie, H.; See, P.; Griffiths, J. P.; Farrer, I.; Jones, G. A. C.; Ritchie, D. A.; Kelly, M. J.; Smith, C. G.

    2015-01-06

    routines. An algorithm is developed to find the spacing between discrete energy levels, which form due to transverse confinement from the split gate. The lever arm, which relates split gate voltage to energy, is also found from the measured data...

  4. User Experiment Time-Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Experiment Time-Line Event Target Call for proposal 2 months before proposals are due PAC Proposals Due 7 weeks before PAC meeting TAC Report for PAC Proposals (includes...

  5. The beauty of laser lines

    E-Print Network [OSTI]

    Kim, Sue-Mie

    1993-01-01

    A line, the simplest way to express an artist's feelings or interpretation of an object, has its own emotions that an artist can employ for her purpose. Laser light, the most self-concentrated, self-sustained and directed, ...

  6. Fin-line horn antenna

    DOE Patents [OSTI]

    Reindel, John (San Diego, CA)

    1990-01-01

    A fin line circuit card containing a fin line slot feeds a dipole antenna ich extends a quarterwave outside the waveguide and provides an energy beam focal point at or near the open end of the waveguide. The dipole antenna thus maintains a wide and nearly constant beamwidth, low VSWR and a circular symmetric radiation pattern for use in electronic warfare direction finding and surveillance applications.

  7. Operation and Maintenance Manual for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Norm Stanley

    2011-02-01

    This Operation and Maintenance Manual lists operator and management responsibilities, permit standards, general operating procedures, maintenance requirements and monitoring methods for the Sewage Treatment Plant at the Central Facilities Area at the Idaho National Laboratory. The manual is required by the Municipal Wastewater Reuse Permit (LA-000141-03) the sewage treatment plant.

  8. MICROCOMPUTERS IN EDUCATIONAL AND RESEARCH ENVIRONMENTS: THEIR MANAGEMENT, ACQUISITION, UPGRADE, AND MAINTENANCE

    E-Print Network [OSTI]

    Marchese, Francis

    concerning communication with vendors and manufacturers involving pre /post sales support, procedures speciftiations, type and period Gf warranty. Repair costs, maintenance contracts and in-house repair strategies to consider when dealing with and choosing vendors and manufacturers. Lastly, the strategies of maintenance

  9. Maintainability Based Risk Assessment in Adaptive Maintenance Context 1 W. Abdelmoez2

    E-Print Network [OSTI]

    Goseva-Popstojanova, Katerina

    , software architectures. 1. Introduction A successful maintenance project necessitates a well on architectural artifacts such as system requirements and system design and their progression through the life project cost; the rest is consumed by maintenance. Systems with poor maintainability are difficult

  10. COMPARING MAINTENANCE APPROACHES FOR TOKAMAK FUSION POWER PLANTS* Lester M. Waganer

    E-Print Network [OSTI]

    California at San Diego, University of

    Waganer 1 COMPARING MAINTENANCE APPROACHES FOR TOKAMAK FUSION POWER PLANTS* Lester M. Waganer generic approaches for maintaining commercial fusion power plants are compared to determine the most tokamak power plant, the ARIES-AT1 . The scheduled and unscheduled maintenance times for the power core

  11. Initial Maintenance Assessment for ARIES-CS Power Plant X. R. Wang, S. Malang

    E-Print Network [OSTI]

    Raffray, A. René

    Initial Maintenance Assessment for ARIES-CS Power Plant X. R. Wang, S. Malang a , A. R. Raffray that will result in the detailed design study of a compact stellarator power plant. The first year engineering and maintenance scheme is quite challenging for a compact stellerator power plant because of the helical plasma

  12. Constructing Bayesian-network Models of Software Testing and Maintenance Uncertainties

    E-Print Network [OSTI]

    Ziv, Hadar

    Constructing Bayesian-network Models of Software Testing and Maintenance Uncertainties-lived software, requirements are analyzed and speci ed, designs and code modules are developed, test- ing, Software testing, Software maintenance 1 #12;1 Introduction Development of complex software is fraught

  13. AMERICAN JOURNAL OF INDUSTRIAL MEDICINE (2010) Hearing Impairment in F-111 Maintenance

    E-Print Network [OSTI]

    Boggess, May M.

    2010-01-01

    Australian Air Force who undertook fuel tank maintenance on F-111 aircraft, with exposure to formulations fuel tank maintenance, adjusting for possible confounders. In addition, the difference between the observed hearing thresholds and the expected thresholds based on an otologically normal population (ISO

  14. Optimization of a Goal Maintenance Task for Use in Clinical Applications Dori Henderson1

    E-Print Network [OSTI]

    Optimization of a Goal Maintenance Task for Use in Clinical Applications Dori Henderson1 , Andrew B Expec- tancy task (DPX) to assess goal maintenance for use in clinical trials. Altering the standard mixed-effects logistic regression within a hierarchical linear model. Results: We analyzed the data from

  15. Abstract The O2 requirements for biomass pro-duction and supplying maintenance energy de-

    E-Print Network [OSTI]

    Daugulis, Andrew J.

    Abstract The O2 requirements for biomass pro- duction and supplying maintenance energy de- mands-state data. For benzene and ethylbenzene, the biomass yield on O2, YX=O2 , was estimated on a cell dry weight.022 mgO2 mg CDW­1 h­1 , respec- tively. Keywords Bioscrubber Æ BTEX Æ Maintenance energy Æ Oxygen

  16. DIESEL/HEAVY The diesel/heavy equipment certificate offers training in maintenance

    E-Print Network [OSTI]

    Ickert-Bond, Steffi

    DIESEL/HEAVY EQUIPMENT The diesel/heavy equipment certificate offers training in maintenance and repair of heavy equipment and trucks. Students will learn to work on electrical and air systems, diesel · Small Engines · Automotive Maintenance · Welding · Training for entry level heavy diesel equipment

  17. Long-Term Data Maintenance in Wide-Area Storage Systems: A Quantitative Approach

    E-Print Network [OSTI]

    Kubiatowicz, John D.

    Long-Term Data Maintenance in Wide-Area Storage Systems: A Quantitative Approach Hakim Weatherspoon-Term Data Maintenance in Wide-Area Storage Systems: A Quantitative Approach Hakim Weatherspoon, Byung data replication levels is a fundamental process of wide-area storage systems; replicas must be created

  18. MAINTENANCE APPROACHES FOR ARIES-CS COMPACT STELLARATOR POWER CORE , S. Malang2

    E-Print Network [OSTI]

    during maintenance operations and to determine the maximum size of the blanket replacement units. IMAINTENANCE APPROACHES FOR ARIES-CS COMPACT STELLARATOR POWER CORE X.R. Wang1 , S. Malang2 , A maintenance approaches envisaged for the Compact Stellarator (CS) power core have been identified

  19. Constraint-based Maintenance Scheduling on an Electric Power-Distribution Network

    E-Print Network [OSTI]

    Ros, Lluís

    Constraint-based Maintenance Scheduling on an Electric Power-Distribution Network Tom Creemers1-distribution network involves the scheduling of multiple maintenance and unforeseen repair tasks. The main resource, energy losses, and the cost of the necessary switching operations. In case tasks are carried out

  20. LS-SVM based spectral clustering and regression for predicting maintenance of industrial machines

    E-Print Network [OSTI]

    ,13 and maintenance operations can be fully automated and implemented in a cost14 effective way.15LS-SVM based spectral clustering and regression for predicting maintenance of industrial machines plays a key role in reducing production arrest, increasing the safety of plant operations

  1. Automated and Scheduled Maintenance of Digital Library Collections Wendy Osborn and Steve Fox

    E-Print Network [OSTI]

    Seldin, Jonathan P.

    Automated and Scheduled Maintenance of Digital Library Collections Wendy Osborn and Steve Fox and scheduled maintenance of a digital library collection. Existing systems require the user either to add new module into the Greenstone digital library software, which allows the user to set up scheduled

  2. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    SciTech Connect (OSTI)

    Wang, Liping; Hong, Tianzhen

    2013-01-01

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct modeling with EnergyPlus, 2) using the energy management system feature of EnergyPlus, and 3) modifying EnergyPlus source code. The results demonstrated the importance of maintenance for HVAC systems on energy performance of buildings. The research is intended to provide a guideline to help practitioners and building operators to gain the knowledge of maintaining HVAC systems in efficient operations, and prioritize HVAC maintenance work plan. The paper also discusses challenges of modeling building maintenance issues using energy simulation programs.

  3. THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.

    2014-04-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accounted for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.

  4. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Harris, S.; Gross, R.; Goble, W; Bukowski, J

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore »for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less

  5. Multiple gamma lines from semi-annihilation

    E-Print Network [OSTI]

    D'Eramo, Francesco

    Hints in the Fermi data for a 130 GeV gamma line from the galactic center have ignited interest in potential gamma line signatures of dark matter. Explanations of this line based on dark matter annihilation face a parametric ...

  6. The Pulse Line Ion Accelerator Concept

    E-Print Network [OSTI]

    Briggs, Richard J.

    2006-01-01

    field model of the pulse- line accelerator; relationship to3, 2006 LBNL-59492 The pulse line ion accelerator conceptCalifornia, 94507 The Pulse Line Ion Accelerator concept was

  7. The COMPTEL instrumental line background

    E-Print Network [OSTI]

    G. Weidenspointner; M. Varendorff; U. Oberlack; D. Morris; S. Plueschke; R. Diehl; S. C. Kappadath; M. McConnell; J. Ryan; V. Schoenfelder; H. Steinle

    2000-12-14

    The instrumental line background of the Compton telescope COMPTEL onboard the Compton Gamma-Ray Observatory is due to the activation and/or decay of many isotopes. The major components of this background can be attributed to eight individual isotopes, namely 2D, 22Na, 24Na, 28Al, 40K, 52Mn, 57Ni, and 208Tl. The identification of instrumental lines with specific isotopes is based on the line energies as well as on the variation of the event rate with time, cosmic-ray intensity, and deposited radiation dose during passages through the South-Atlantic Anomaly. The characteristic variation of the event rate due to a specific isotope depends on its life-time, orbital parameters such as the altitude of the satellite above Earth, and the solar cycle. A detailed understanding of the background contributions from instrumental lines is crucial at MeV energies for measuring the cosmic diffuse gamma-ray background and for observing gamma-ray line emission in the interstellar medium or from supernovae and their remnants. Procedures to determine the event rate from each background isotope are described, and their average activity in spacecraft materials over the first seven years of the mission is estimated.

  8. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    & Reliability Projects Expand Projects Skip navigation links Line Projects Big Eddy-Knight Central Ferry Lower Monumental Grand Coulee Transmission Line Replacement...

  9. Transmission Line MTF: Magnetized Target Fusion

    E-Print Network [OSTI]

    Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap

  10. What can emission lines tell us?

    E-Print Network [OSTI]

    G. Stasinska

    2007-04-03

    1 Generalities 2 Empirical diagnostics based on emission lines 3 Photoionization modelling 4 Pending questions 5 Appendix: Lists of useful lines and how to deal with them

  11. Improve predictive maintenance with HFE monitoring. [High Frequency Envelope

    SciTech Connect (OSTI)

    Page, E.A. ); Berggren, C. )

    1994-01-01

    New on-line machine vibration monitoring systems are offering substantially lower costs and simpler installation requirement. By incorporating high-frequency envelope (HFE) spectrum analysis, these systems can provide earlier and more reliable fault detection. These new capabilities are spurring a transition to on-line predictive monitoring of even noncritical machinery. These condition-monitoring systems automatically perform both conventional vibration analysis and HFE spectrum analysis. Conventional low-frequency spectrum analysis, between 0 to 10 kHz, is widely acknowledged as the most effective means of detecting imbalance, misalignment, mechanical resonances and looseness on machinery. HFE spectrum analysis, above 15 kHz, is now accepted as the most effective method for detecting machine faults, such as pitting or cracking in bearings and gears, insufficient lubrication, shaft rubbing and pump cavitation. The performance and economics of this method is discussed.

  12. Proposal for the award of a contract, without competitive tendering, for the licensing, maintenance and support of ORACLE software

    E-Print Network [OSTI]

    2013-01-01

    Proposal for the award of a contract, without competitive tendering, for the licensing, maintenance and support of ORACLE software

  13. Update on maintenance and service costs of commercial building ground-source heat pump systems

    SciTech Connect (OSTI)

    Cane, D.; Garnet, J.M.

    2000-07-01

    An earlier paper showed that commercial ground-source heat pump systems have significantly lower service and maintenance costs than alternative HVAC systems. This paper expands on those results by adding 13 more buildings to the original 25 sites and by comparing the results to the latest ASHRAE survey of HVAC maintenance costs. Data from the 38 sites are presented here including total (scheduled and unscheduled) maintenance costs in cents per square foot per year for base cost, in-house, and contractor-provided maintenance. Because some of the new sites had maintenance costs that were much higher than the industry norm, the resulting data are not normally distributed. Analysis (O'Hara Hines 1998) indicated that a log-normal distribution is a better fit; thus, the data are analyzed and presented here as log-normal. The log-mean annual total maintenance costs for the most recent year of the survey ranged from 6.07 cents per square foot to 8.37 cents per square foot for base cost and contractor-provided maintenance, respectively.

  14. Multi-modal Transportation > Highway Transportation > Trucking > Railroad transportation > Public transit > Rural transportation > Rural transit > Freight pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedes

    E-Print Network [OSTI]

    and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operat and development > Airport maintenance > Bicycle and pedestrian > Ports and waterways >>> Transportation operations pipeline transportation > Airport planning and development > Airport maintenance > Bicycle and pedestrian

  15. Coiled transmission line pulse generators

    DOE Patents [OSTI]

    McDonald, Kenneth Fox (Columbia, MO)

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  16. IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, VOL. 23, NO. 3, AUGUST 2010 477 Optimal Preventive Maintenance Scheduling in

    E-Print Network [OSTI]

    Fernandez, Emmanuel

    of pre- ventive maintenance (PM) tasks in semiconductor manufacturing operations. We also present results Preventive Maintenance Scheduling in Semiconductor Manufacturing Systems: Software Tool and Simulation Case of a preventive maintenance optimization software tool (PMOST), based on algorithms for the optimal scheduling

  17. A Novel Approach for Cooperative Overlay-Maintenance in Multi-Overlay Environments Chin-Jung Hsu

    E-Print Network [OSTI]

    Chung, Yeh-Ching

    ], [15], [18]. Since some overlay- maintenance operations are identical, they imply large redundant overhead for maintaining similar operations. Some recent studies tried to reduce the redundant overlay-maintenanceA Novel Approach for Cooperative Overlay-Maintenance in Multi-Overlay Environments Chin-Jung Hsu Wu

  18. IEEE TRANSACTIONS ON RELIABILITY, VOL. 55, NO. 1, MARCH 2006 123 Quality-Oriented-Maintenance for Multiple

    E-Print Network [OSTI]

    Jin, Jionghua "Judy"

    IEEE TRANSACTIONS ON RELIABILITY, VOL. 55, NO. 1, MARCH 2006 123 Quality-Oriented-Maintenance. Therefore, maintenance of the tooling components with consideration of both their continuous state drifts. In contrast to traditional maintenance models where product quality has not been well addressed, especially

  19. 2003 Long-Term Surveillance and Maintenance Program Report

    SciTech Connect (OSTI)

    2004-07-01

    Radioactive waste was created by the Federal Government and private industry at locations around the country in support of national defense, research, and civilian power-generation programs. If not controlled, much of this legacy waste would remain hazardous to human health and the environment indefinitely. Current technology does not allow us to render this waste harmless, so the available methods to control risk rely on consolidation, isolation, and long-term management of the waste. The U.S. Department of Energy (DOE) has an obligation to safely control the radioactive waste and to inform and train future generations to maintain and, perhaps, improve established protections. DOE is custodian for much of the radioactive and other hazardous waste under control of the Federal Government. DOE established the Formerly Utilized Sites Remedial Action Program (FUSRAP) in 1974 and the Defense Decontamination and Decommissioning (D&D) Program and the Surplus Facilities Management Program in the 1980s. Congress passed the Uranium Mill Tailings Radiation Control Act (UMTRCA) in 1978. These federal programs and legislation were established to identify, remediate, and manage legacy waste. Remedial action is considered complete at a radioactive waste site when the identified hazardous material is isolated and the selected remedial action remedy is in place and functioning. Radioactive or other hazardous materials remain in place as part of the remedy at many DOE sites. Long-term management of radioactive waste sites incorporates a set of actions necessary to maintain protection of human health and the environment. These actions include maintaining physical impoundment structures in good repair to ensure that they perform as designed, preventing exposure to the wastes by maintaining access restrictions and warnings, and recording site conditions and activities for future custodians. Any actions, therefore, that will prevent exposure to the radioactive waste now or in the future are part of long-term site management. In response to post-closure care requirements set forth in UMTRCA, DOE Headquarters established the Long-Term Surveillance and Maintenance (LTS&M) Program in 1988 at the DOE office in Grand Junction, Colorado. The program assumed long-term management responsibility for sites remediated under UMTRCA and other programs. Since its inception, the LTS&M Program has evolved in response to changing stakeholder needs, improvements in technology, and the addition of more DOE sites as remediation is completed. The mission of the LTS&M Program was to fulfill DOE’s responsibility to implement all activities necessary to ensure regulatory compliance and to protect the public and the environment from long-lived wastes associated with the nation’s nuclear energy, weapons, and research activities. Key components of the LTS&M Program included stakeholder participation, site monitoring and maintenance, records and information management, and research and technology transfer. This report presents summaries of activities conducted in 2003 in fulfillment of the LTS&M Program mission. On December 15, 2003, DOE established the Office of Legacy Management (LM) to allow for optimum management of DOE’s legacy responsibilities. Offices are located in Washington, DC, Grand Junction, Colorado, Morgantown, West Virginia, and Pittsburgh, Pennsylvania, to perform long-term site management, land management, site transition support, records management, and other related tasks. All activities formerly conducted under the LTS&M Program have been incorporated into the Office of Land and Site Management (LM–50), as well as management of remedies involving ground water and surface water contaminated by former processing activities.

  20. ROUTINE HEMATOLOGY SPECIMEN COLLECTION

    E-Print Network [OSTI]

    Citrate ­ binds calcium ­ light blue Lithium Heparin ­ interacts with antithrombin III - green PHLEBOTOMY #12;9/16/2013 3 HEMACYTOMETER Manual Counts MANUAL WHITE CELL COUNTS 3% acetic Acid 1:100 Total PLATELET COUNTS 1% ammonium oxalate or acetic acid 1:100 Count all areas in large center square Multiply

  1. Prescriptions: Your routine prescription

    E-Print Network [OSTI]

    Reidenbach, Matthew A.

    ] or bismuth subsalicylate [Pepto-Bismol] ) Antihistamine Motion sickness medicine Cough drops Cough

  2. Site transition framework for long-term surveillance and maintenance

    SciTech Connect (OSTI)

    2014-04-01

    This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a site’s transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.

  3. REPORT on the TRUCK BRAKE LINING WORKSHOP and FLEET OPERATORS' SURVEY

    SciTech Connect (OSTI)

    Blau, P.J.

    2003-02-03

    The report summarizes what transpired during brake linings-related workshop held at the Fall 2003 meeting of the Technology and Maintenance Council (TMC) in Charlotte, NC. The title of the workshop was ''Developing a Useful Friction Material Rating System''. It was organized by a team consisting of Peter Blau (Oak Ridge National Laboratory), Jim Britell (National Highway Traffic Safety Administration), and Jim Lawrence (Motor and Equipment Manufacturers Association). The workshop was held under the auspices of TMC Task Force S6 (Chassis), chaired by Joseph Stianche (Sanderson Farms, Inc.). Six invited speakers during the morning session provided varied perspectives on testing and rating aftermarket automotive and truck brake linings. They were: James R. Clark, Chief Engineer, Foundation Brakes and Wheel Equipment, Dana Corporation, Spicer Heavy Axle and Brake Division; Charles W. Greening, Jr, President, Greening Test Labs; Tim Duncan, General Manager, Link Testing Services;Dennis J. McNichol, President, Dennis NationaLease; Jim Fajerski, Business Manager, OE Sales and Applications Engineering, Federal Mogul Corporation; and Peter J. Blau, Senior Materials Development Engineer, Oak Ridge National Laboratory. The afternoon break-out sessions addressed nine questions concerning such issues as: ''Should the federal government regulate aftermarket lining quality?''; ''How many operators use RP 628, and if so, what's good or bad about it?''; and ''Would there be any value to you of a vocation-specific rating system?'' The opinions of each discussion group, consisting of 7-9 participants, were reported and consolidated in summary findings on each question. Some questions produced a greater degree of agreement than others. In general, the industry seems eager for more information that would allow those who are responsible for maintaining truck brakes to make better, more informed choices on aftermarket linings. A written fleet operator survey was also conducted during the TMC meeting. Twenty-one responses were received, spanning fleet sizes between 12 and 170,000 vehicles. Responses are summarized in a series of tables separated into responses from small (100 or fewer powered vehicles), medium (101-1000 vehicles), and large fleets (>1000 vehicles). The vast majority of fleets do their own brake maintenance, relying primarily on experience and lining manufactures to select aftermarket linings. At least half of the responders are familiar to some extent with TMC Recommended Practice 628 on brake linings, but most do not use this source of test data as the sole criterion to select linings. Significant shortfalls in the applicability of TMC RP 628 to certain types of brake systems were noted.

  4. Preventive maintenance scheduling based on failure data in a medical device manufacturing facility

    E-Print Network [OSTI]

    Mohd Fauzi, Mohammed Faizal B

    2009-01-01

    This study was conducted at a medical device production facility where analysis was done on the reliability of Product S barrel molds for the purpose of predicting preventive maintenance (PM) schedule. Pareto Rule was ...

  5. Identifying genes that are required for the maintenance of pancreatic ductal adenocarcinoma

    E-Print Network [OSTI]

    Jenq, Harry

    2012-01-01

    We searched for genes that are potentially important for the maintenance of Pancreatic Ductal Adenocarcinoma (PDAC). PDAC is the 4th leading cause for cancer-related deaths and exhibits a 5-year survival rate of less than ...

  6. Genetic analysis of the maintenance of neuronal morphology in Drosophila melanogaster

    E-Print Network [OSTI]

    Whited, Jessica LaMae, 1976-

    2006-01-01

    Precise control of cellular morphology is critical for both the development and maintenance of nervous systems. In the developing Drosophila eye, normal photoreceptor cells establish and maintain a highly polarized ...

  7. The impact of maintenance and rehabilitation strategies on the pavement network value 

    E-Print Network [OSTI]

    Chang Albitres, Carlos Martin

    1999-01-01

    strategy. However, these benefits do not necessarily translate into funds available to the agency. An asset management approach to assess the impact of pavement maintenance and rehabilitation scenarios on the pavement network value is presented...

  8. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-12

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Cancels DOE G 433.1-1.

  9. Outsourcing transportation infrastructure maintenance : a theoretical approach with application to JR East

    E-Print Network [OSTI]

    Hirano, Jun, 1974-

    2004-01-01

    In transportation agencies, how to reduce maintenance and operation cost is one of the biggest and most common concerns, because their revenue is not expected to increase drastically in the future. One of the solutions ...

  10. Potential Operation and Maintenance (O&M) Savings at the State Capitol Complex 

    E-Print Network [OSTI]

    Houcek, J. K.; Liu, M.; Claridge, D. E.; Haberl, J. S.; Katipamula, S.; Abbas, M.

    1993-01-01

    This report presents the results of a study of the potential cost savings by improving operations and maintenance (O&M) practices at eight buildings of the State Capitol Complex, monitored by the LoanSTAR program. This report discusses...

  11. Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-05-20

    To establish Department of Energy (DOE) management policy for the planning, programming, budgeting, operation, maintenance and disposal of real property owned by the United States and under the custody and control of DOE.

  12. VP of Transmission System Asset Management for Desert Southwest Region (Maintenance Manager)

    Broader source: Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Maintenance (G5000) 615 S. 43rd Avenue Phoenix, AZ 85009...

  13. Fusion Engineering and Design 80 (2006) 161180 ARIES-AT maintenance system definition and analysis

    E-Print Network [OSTI]

    2006-01-01

    of attaining a relatively short refurbishment time. The developed timelines are presented for the scheduled maintenance of the power core. The short core refurbishment time coupled, with evolutionary improvements

  14. Evaluation of non-intrusive monitoring for condition based maintenance applications on US Navy propulsion plants

    E-Print Network [OSTI]

    Greene, William C. (William Calvin)

    2005-01-01

    The thesis explores the use of the Non-intrusive Load Monitor (NILM) in Condition Based Maintenance (CBM) applications on US Navy ships as part of the Office of Naval Research Electric Ship Integration (ESI) Initiative. ...

  15. Order Module--DOE O 433.1B, MAINTENANCE MANAGEMENT PROGRAM FOR DOE NUCLEAR FACILITIES

    Office of Energy Efficiency and Renewable Energy (EERE)

    "The familiar level of this module is designed to summarize the basic information in DOE O 433.1B, Maintenance Management Program for DOE Nuclear Facilities. This Order canceled DOE O 433.1A. This...

  16. Regular Inspection and Maintenance Guidance for Gravel Wetland Stormwater Management Device

    E-Print Network [OSTI]

    5 Regular Inspection and Maintenance Guidance for Gravel Wetland Stormwater Management Device and not a criterion for cleaning. Rather, stormwater access to subsurface treatment is by way of inlet standpipes

  17. Potential Operation and Maintenance (O&M) Savings at the Dunbar Middle and Sims Elementary Schools 

    E-Print Network [OSTI]

    Liu, M.; Houcek, J. K.; Claridge, D. E.; Haberl, J. S.

    1993-01-01

    This report presents the results of a study of the potential cost savings which may be achieved by improving operational and maintenance (O&M) practices at Dunbar Middle School and Sims Elementary School in the Fort Worth ...

  18. Operation and maintenance manual for the LDUA operations control trailer (LDUA System 4100)

    SciTech Connect (OSTI)

    Clark, D.A.

    1996-09-10

    The Light Duty Utility Arm (LDUA) Operations Control Trailer(OCT) has completed testing and is ready for operation. This document defines the requirements applicable to the operation and maintenance of the OCT.

  19. Desired outcomes, unexpected processes : two stories of sanitation maintenance in Erode tenements, India

    E-Print Network [OSTI]

    Balakrishnan, Sai

    2008-01-01

    A central challenge facing municipalities in developing countries is the successful maintenance of sanitation services for their urban poor. Not only are municipalities struggling to cope with increased sanitation coverage ...

  20. UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIRMENTS & STANDARDS MAINTENANCE OF EXISTING CONDITIONS

    E-Print Network [OSTI]

    Arnold, Jonathan

    DEMOLITION 1. GENERAL A. Related sections: i. 01 74 19 ­ Construction Waste Management & Disposal ii. 10 44 UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIRMENTS & STANDARDS MAINTENANCE OF EXISTING be issued by the Owner. #12;UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIRMENTS & STANDARDS

  1. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1B

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-09-09

    The guide provides acceptable approaches for implementing requirements for Nuclear Maintenance Management Programs (NMMPs) set forth in DOE O 433.1B. Admin Chg 1, dated 6-14-13, supersedes DOE G 433.1-1A.

  2. The Effects of Maintenance Actions on the PFDavg of Spring Operated...

    Office of Scientific and Technical Information (OSTI)

    the effects of changes in maintenance practices and shows how these changes impact plant safety. Authors: Harris, S. 1 ; Gross, R. 2 ; Goble, W 3 ; Bukowski, J 4 + Show...

  3. Nuclear Facility Maintenance Management Program Guide for Use with DOE O 433.1

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-09-05

    This Guide describes a maintenance management program that would be acceptable to DOE for meeting the requirements of DOE O 433.1. Canceled by DOE G 433.1-1A.

  4. Using Mentor, an Expert System, to Perform Preventative Maintenance and Diagnostics on Centrifugal Chillers 

    E-Print Network [OSTI]

    Culp, C.; Mills, R.

    1990-01-01

    undergone several upgrades and enhancements since then. This paper will discuss the human interface needs for this application, the functional characteristics of the expert system, the development environment and a case history of maintenance on a chiller....

  5. Effects of Dietary Energy Density and Intake on Maintenance Energy Requirements in Beef Cows 

    E-Print Network [OSTI]

    Trubenbach, Levi Anthony

    2014-12-11

    nutritional manipulation strategies to optimize cow efficiency. An experiment was conducted to analyze the effects of dietary energy density and intake on maintenance energy requirements in beef cows. In a 2 x 2 factorial treatment arrangement, thirty...

  6. In-line thermoelectric module

    DOE Patents [OSTI]

    Pento, Robert (Algonquin, IL); Marks, James E. (Glenville, NY); Staffanson, Clifford D. (S. Glens Falls, NY)

    2000-01-01

    A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions may be perpendicular to the direction of current flow through the module.

  7. Maintenance manual for the Beneficial Uses Shipping System cask. Revision 1

    SciTech Connect (OSTI)

    Bronowski, D.R.; Yoshimura, H.R.

    1993-05-01

    This document is the Maintenance Manual for the Beneficial Uses Shipping System (BUSS) cask. These instructions address requirements for maintenance, inspection, testing, and repair, supplementing general information found in the BUSS Safety Analysis Report for Packaging (SARP), SAND 83-0698. Use of the BUSS cask is authorized by the Department of Energy (DOE) and the Nuclear Regulatory Commission (NRC) for the shipment of special form cesium chloride or strontium flouride capsules.

  8. Effect of orientation and location during transport on stress and maintenance of balance in horses 

    E-Print Network [OSTI]

    Clark, Diana Kathleen

    1991-01-01

    EFFECT OF ORIENTATION AND LOCATION DURING TRANSPORT ON STRESS AND MAINTENANCE OF BALANCE IN HORSES A Thesis by DIANA KATHLEEN CLARK Submitted to the Office of Graduate Studies of Texas AKIM University in partial fulfillment of the requirement... for the degree of MASTER OF SCIENCE December 1991 Major Subject: Animal Science EFFECT OF ORIENTATION AND LOCATION DURING TRANSPORT ON STRESS AND MAINTENANCE OF BALANCE IN HORSES A Thesis by Diana Xathleen Clark Approved as to style and content by: T. H...

  9. Office of Inspector General audit report on maintenance activities at the Y-12 Plant

    SciTech Connect (OSTI)

    NONE

    1999-05-01

    The Office of Inspector General has not reviewed maintenance activities at the Y-12 Plant in recent years. However, an audit was performed of maintenance activities at the East Tennessee Technology Park (formerly the K-25 Site) in February 1994. The audit concluded that Lockheed Martin (formerly Martin Marietta Energy Systems) had not effectively used engineered performance standards to estimate maintenance hours, and had not adequately analyzed variances between actual and estimated hours to identify and correct maintenance inefficiencies. The objective of this audit was to determine whether Lockheed Martin used performance measures to identify and correct inefficiencies in its maintenance program. Lockheed Martin did not adequately use performance measures to identify and correct inefficiencies in its maintenance program. Specifically, Lockheed Martin did not adequately apply engineered time standards in estimating jobs, nor did it use variance analysis to resolve deviations from job plans. This condition occurred because Lockheed Martin did not fully implement Departmental guidelines. As a result, Lockheed martin missed opportunities to improve its performance and cost-effectiveness.

  10. RESEARCH PATIENT CARE COSTS --NIH(RC)-11 (a) Research patient care costs are the costs of routine and ancillary services provided to patients

    E-Print Network [OSTI]

    Ungerleider, Leslie G.

    RESEARCH PATIENT CARE COSTS -- NIH(RC)-11 (a) Research patient care costs are the costs of routine) Patient care costs shall be computed in a manner consistent with the principles and procedures used by the Medicare Program for determining the part of Medicare reimbursement based on reasonable costs

  11. Data Sharing Report for the Quantification of Removable Activity in Various Surveillance and Maintenance Facilities at the Oak Ridge National Laboratory Oak Ridge TN

    SciTech Connect (OSTI)

    King, David A

    2013-12-12

    The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OR-EM) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support using American Recovery and Reinvestment Act (ARRA) funds. Specifically, DOE OR-EM requested that ORAU plan and implement a sampling and analysis campaign targeting potential removable radiological contamination that may be transferrable to future personal protective equipment (PPE) and contamination control materials—collectively referred to as PPE throughout the remainder of this report—used in certain URS|CH2M Oak Ridge, LLC (UCOR) Surveillance and Maintenance (S&M) Project facilities at the Oak Ridge National Laboratory (ORNL). Routine surveys in Bldgs. 3001, 3005, 3010, 3028, 3029, 3038, 3042, 3517, 4507, and 7500 continuously generate PPE. The waste is comprised of Tyvek coveralls, gloves, booties, Herculite, and other materials used to prevent worker exposure or the spread of contamination during routine maintenance and monitoring activities. This report describes the effort to collect and quantify removable activity that may be used by the ORNL S&M Project team to develop radiation instrumentation “screening criteria.” Material potentially containing removable activity was collected on smears, including both masselin large-area wipes (LAWs) and standard paper smears, and analyzed for site-related constituents (SRCs) in an analytical laboratory. The screening criteria, if approved, may be used to expedite waste disposition of relatively clean PPE. The ultimate objectives of this effort were to: 1) determine whether screening criteria can be developed for these facilities, and 2) provide process knowledge information for future site planners. The screening criteria, if calculated, must be formally approved by Federal Facility Agreement parties prior to use for ORNL S&M Project PPE disposal at the Environmental Management Waste Management Facility (EMWMF). ORAU executed the approved sampling and analysis plan (SAP) (DOE 2013) while closely coordinating with ORNL S&M Project personnel and using guidelines outlined in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012). WHP guidelines were followed because the PPE waste targeted by this SAP is consistent with that addressed under the approved Waste Lot (WL) 108.1 profile for disposal at EMWMF—this PPE is a “future waste stream” as defined in the WHP. The SAP presents sampling strategy and methodology, sample selection guidelines, and analytical guidelines and requirements necessary for characterizing future ORNL S&M Project PPE waste. This report presents a review of the sample and analysis methods including data quality objectives (DQOs), required deviations from the original design, summary of field activities, radiation measurement data, analytical laboratory results, a brief presentation of results, and process knowledge summaries.

  12. NETL LINES OF DEMARCATION 09282012

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Homesum_a_epg0_fpd_mmcf_m.xls" ,"Available from WebQuantityBonneville Power Administration wouldMass map shines light on771/6/14 Contact: Janet Lambert Reviewed: 3/5/14 Page 1 of 178LINES

  13. Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization

    DOE Patents [OSTI]

    Jankowiak, Ryszard J. (Ames, IA); Small, Gerald J. (Ames, IA); Shields, Peter A. (Reading, MA)

    1999-04-27

    Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes.

  14. Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization

    DOE Patents [OSTI]

    Jankowiak, R.J.; Small, G.J.; Shields, P.A.

    1999-04-27

    Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes. 21 figs.

  15. Coordination of Transmission Line Transfer Capabilities

    E-Print Network [OSTI]

    Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Industry Representative Richard Goddard Portland General Electric Research Team Students Yuan Li Yonghong

  16. Nondestructive Testing of Rail Tunnel Linings 

    E-Print Network [OSTI]

    Williams, Nathan Douglas

    2014-11-14

    potential problems and then test those areas with slow, detailed methods. This would provide a more thorough investigation of the tunnel lining’s health. Infrared thermography (IRT), ground penetrating radar (GPR), and ultrasonic tomography (UST) techniques...

  17. Maintenance and operation procedure, and feedback controls of the J-PARC RF-driven H{sup ?} ion source

    SciTech Connect (OSTI)

    Ueno, A. Ohkoshi, K.; Ikegami, K.; Takagi, A.; Yamazaki, S.; Oguri, H.

    2015-04-08

    In order to satisfy the Japan Proton Accelerator Research Complex (J-PARC) second stage requirements of an H{sup ?} ion beam of 60mA within normalized emittances of 1.5?mm•mrad both horizontally and vertically, a flat top beam duty factor of 1.25% (500?s×25Hz) and a life-time of longer than 1month, the J-PARC cesiated RF-driven H{sup ?} ion source was developed by using an internal-antenna developed at the Spallation Neutron Source (SNS). The maintenance and operation procedure to minimize the plasma chamber (PCH) replacement time on the beam line, which is very important to maximize the J-PARC beam time especially for an antenna failure, is presented in this paper. The PCH preserved by filling argon (Ar) gas inside after pre-conditioning including pre-cesiation to produce the required beam at a test-stand successfully produced the required beam on the beam line with slight addition of cesium (Cs). The methods of the feedback controls of a 2MHz-RF-matching, an H{sup ?} ion beam intensity and the addition of Cs are also presented. The RF-matching feedback by using two vacuum variable capacitors (VVCs) and RF-frequency shift produced the almost perfect matching with negligibly small reflected RF-power. The H{sup ?} ion beam intensity was controlled within errors of ±0.1mA by the RF-power feedback. The amount of Cs was also controlled by remotely opening a Cs-valve to keep the RF-power lower than a settled value.

  18. REQUIREMENTS AND GUIDELINES FOR NSLS EXPERIMENTAL BEAM LINE VACUUM SYSTEMS-REVISION B.

    SciTech Connect (OSTI)

    FOERSTER,C.

    1999-05-01

    Typical beam lines are comprised of an assembly of vacuum valves and shutters referred to as a ''front end'', optical elements to monochromatize, focus and split the photon beam, and an experimental area where a target sample is placed into the photon beam and data from the interaction is detected and recorded. Windows are used to separate sections of beam lines that are not compatible with storage ring ultra high vacuum. Some experimental beam lines share a common vacuum with storage rings. Sections of beam lines are only allowed to vent up to atmospheric pressure using pure nitrogen gas after a vacuum barrier is established to protect ring vacuum. The front end may only be bled up when there is no current in the machine. This is especially true on the VUV storage ring where for most experiments, windows are not used. For the shorter wavelength, more energetic photons of the x-ray ring, beryllium windows are used at various beam line locations so that the monochromator, mirror box or sample chamber may be used in a helium atmosphere or rough vacuum. The window separates ring vacuum from the environment of the downstream beam line components. The stored beam lifetime in the storage rings and the maintenance of desirable reflection properties of optical surfaces depend upon hydrocarbon-free, ultra-high vacuum systems. Storage ring vacuum systems will operate at pressures of {approximately} 1 x 10{sup {minus}10} Torr without beam and {approximately} 1 x 10{sup {minus}9} Torr with beam. Systems are free of hydrocarbons in the sense that no pumps, valves, etc. containing organics are used. Components are all-metal, chemically cleaned and bakeable. To the extent that beam lines share a common vacuum with the storage ring, the same criteria will hold for beam line components. The design philosophy for NSLS beam lines is to use all-metal, hydrocarbon-free front end components and recommend that experimenters use this approach for common vacuum hardware downstream of front ends. O-ring-sealed valves, if used, are not permitted upstream of the monochromator exit aperture. It will be the responsibility of users to demonstrate that their experiment will not degrade the pressure or quality of the storage ring vacuum. As a matter of operating policy, all beam lines will be monitored for prescribed pressure and the contribution of high mass gases to this pressure each time a beam line has been opened to ring vacuum.

  19. World-line approach to Sign Problems

    E-Print Network [OSTI]

    Aarts, Gert

    World-line approach to Sign Problems Shailesh Chandrasekharan Duke University #12;Outline XY model + chemical potential world-line approach solving the silver blaze problem! Two component bosons + Abelian world-line approach solving the silver blaze problem! more flavors + solving sign problems

  20. Linear rotary optical delay lines Maksim Skorobogatiy*

    E-Print Network [OSTI]

    Skorobogatiy, Maksim

    Linear rotary optical delay lines Maksim Skorobogatiy* Department of Engineering Physics, École of analytical and semi-analytical solutions for the design of high-speed rotary optical delay lines that use of optical delay. Finally, two prototypes of rotary delay lines were fabricated using CNC machining

  1. Application of Crunch-Flow Routines to Constrain Present and Past Carbon Fluxes at Gas-Hydrate Bearing Sites

    SciTech Connect (OSTI)

    Torres, Marta

    2014-01-31

    In November 2012, Oregon State University initiated the project entitled: Application of Crunch-Flow routines to constrain present and past carbon fluxes at gas-hydrate bearing sites. Within this project we developed Crunch-Flow based modeling modules that include important biogeochemical processes that need to be considered in gas hydrate environments. Our modules were applied to quantify carbon cycling in present and past systems, using data collected during several DOE-supported drilling expeditions, which include the Cascadia margin in US, Ulleung Basin in South Korea, and several sites drilled offshore India on the Bay of Bengal and Andaman Sea. Specifically, we completed modeling efforts that: 1) Reproduce the compositional and isotopic profiles observed at the eight drilled sites in the Ulleung Basin that constrain and contrast the carbon cycling pathways at chimney (high methane flux) and non-chimney sites (low methane, advective systems); 2) Simulate the Ba record in the sediments to quantify the past dynamics of methane flux in the southern Hydrate Ridge, Cascadia margin; and 3) Provide quantitative estimates of the thickness of individual mass transport deposits (MTDs), time elapsed after the MTD event, rate of sulfate reduction in the MTD, and time required to reach a new steady state at several sites drilled in the Krishna-Godavari (K-G) Basin off India. In addition we developed a hybrid model scheme by coupling a home-made MATLAB code with CrunchFlow to address the methane transport and chloride enrichment at the Ulleung Basins chimney sites, and contributed the modeling component to a study focusing on pore-scale controls on gas hydrate distribution in sediments from the Andaman Sea. These efforts resulted in two manuscripts currently under review, and contributed the modeling component of another pare, also under review. Lessons learned from these efforts are the basis of a mini-workshop to be held at Oregon State University (Feb 2014) to instruct graduate students (OSU and UW) as well as DOE staff from the NETL lab in Albany on the use of Crunch Flow for geochemical applications.

  2. Mode propagation and attenuation in lined ducts

    E-Print Network [OSTI]

    BI, Wenping

    2014-01-01

    Optimal impedance for each mode is an important concept in an infinitely long duct lined with uniform absorption material. However it is not valid for finite length linings. This is because that the modes in lined ducts are not power-orthogonal; the total sound power is not equal to the sum of the sound power of each mode; cross-power terms may play important roles. In this paper, we study sound propagation and attenuation in an infinite rigid duct lined with a finite length of lining impedance. The lining impedance may be axial segments and circumferentially non-uniform. We propose two new physical quantities Kp and S to describe the self-overlap of the left eigenfunction and right eigenfunction of one mode and the normalized overlap between modes, respectively. The two new physical quantities describe totally the mode behaviors in lined ducts.

  3. Unsplit bipolar pulse forming line

    DOE Patents [OSTI]

    Rhodes, Mark A. (Pleasanton, CA)

    2011-05-24

    A bipolar pulse forming transmission line module and system for linear induction accelerators having first, second, third, and fourth planar conductors which form a sequentially arranged interleaved stack having opposing first and second ends, with dielectric layers between the conductors. The first and second planar conductors are connected to each other at the first end, and the first and fourth planar conductors are connected to each other at the second end via a shorting plate. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short at the first end a high voltage from the third planar conductor to the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

  4. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

    1987-05-19

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

  5. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, Kenneth E. (Naperville, IL)

    1989-01-01

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

  6. Magnetically insulated transmission line oscillator

    DOE Patents [OSTI]

    Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

    1988-01-01

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

  7. Gamma-Ray Burst Lines

    E-Print Network [OSTI]

    Michael S. Briggs

    1999-10-20

    The evidence for spectral features in gamma-ray bursts is summarized. As a guide for evaluating the evidence, the properties of gamma-ray detectors and the methods of analyzing gamma-ray spectra are reviewed. In the 1980's, observations indicated that absorption features below 100 keV were present in a large fraction of bright gamma-ray bursts. There were also reports of emission features around 400 keV. During the 1990's the situation has become much less clear. A small fraction of bursts observed with BATSE have statistically significant low-energy features, but the reality of the features is suspect because in several cases the data of the BATSE detectors appear to be inconsistent. Furthermore, most of the possible features appear in emission rather than the expected absorption. Analysis of data from other instruments has either not been finalized or has not detected lines.

  8. Microlensing induced absorption line variability

    E-Print Network [OSTI]

    Geraint F. Lewis; Rodrigo A. Ibata

    2002-12-02

    Gravitational microlensing has proven to be a powerful probe of both the structure at the heart of quasars and the mass function of compact objects in foreground lenses. This paper examines the potential of gravitational microlensing in probing the scale of structure in absorbing material within the lensing galaxy. We find that, in this high optical depth regime, significant variations in the equivalent width of absorption features can be induced, although the details of these are dependent upon the scale of structure of the absorbing material. The paper concludes with an examination of the absorption line variability observed in the gravitationally lensed quasar PKS1830-211, demonstrating how this may indicate the presence of small scale structure in the cold molecular gas present within the lensing galaxy.

  9. Superconducting transmission line particle detector

    DOE Patents [OSTI]

    Gray, K.E.

    1988-07-28

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

  10. Supplemental On-Line Materials Supplemental on line materials 1 of 12

    E-Print Network [OSTI]

    Bishop, James K.B.

    Supplemental On-Line Materials Supplemental on line materials 1 of 12 Robotic ObservationsX: Enhanced Carbon Biomass and Export at 55S Supplemental on line materials 2 of 12 Carbon Explorer / Patch to NZ B #12;Bishop et al. SOFeX: Enhanced Carbon Biomass and Export at 55S Supplemental on line

  11. Titanium addition practice, and maintenance for the hearths in AHMSA`s blast furnaces

    SciTech Connect (OSTI)

    Boone, A.G.; Jimenez, G.; Castillo, J. [Altos Hornos de Mexico, Monclova (Mexico)

    1997-12-31

    Altos Hornos de Mexico (AHMSA) is a steel company located in Northern Mexico, in the state of Coahuila. Currently there are three blast furnaces in operation and one more about to finish its general repair. This last one is to remain as a back-up unit. Because of blast furnace hearth wear outs AHMSA has developed some maintenance procedures. These procedures are based on titanium ore additions and hearth thermic control monitoring. There are also some other maintenance practices adopted to the working operations to assure that such operations detect and avoid in time hearth wear outs that place personnel and/or the unit in danger (due to hearth leaks). This paper describes titanium ore addition to No. 2 blast furnace during the final campaign and it also illustrates maintenance practices and continuous monitoring of temperature trends both of which were implemented at AHMSA`s No. 5 blast furnace.

  12. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2009

    SciTech Connect (OSTI)

    None

    2010-10-01

    This report summarizes the annual inspection, sampling, and maintenance activities performed on and near the Salmon, Mississippi, Site in calendar year 2009. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities and the results of sample analyses. This report complies with the annual report requirement. The Salmon, MS, Site is located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS The site encompasses 1,470 acres and is not open to the general public. The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the site. The DOE Office of Legacy Management (LM) was assigned responsibility for the site effective October 1, 2006

  13. Analyses in support of risk-informed natural gas vehicle maintenance facility codes and standards :

    SciTech Connect (OSTI)

    Ekoto, Isaac W.; Blaylock, Myra L.; LaFleur, Angela Christine; LaChance, Jeffrey L.; Horne, Douglas B.

    2014-03-01

    Safety standards development for maintenance facilities of liquid and compressed gas fueled large-scale vehicles is required to ensure proper facility design and operation envelopes. Standard development organizations are utilizing risk-informed concepts to develop natural gas vehicle (NGV) codes and standards so that maintenance facilities meet acceptable risk levels. The present report summarizes Phase I work for existing NGV repair facility code requirements and highlights inconsistencies that need quantitative analysis into their effectiveness. A Hazardous and Operability study was performed to identify key scenarios of interest. Finally, scenario analyses were performed using detailed simulations and modeling to estimate the overpressure hazards from HAZOP defined scenarios. The results from Phase I will be used to identify significant risk contributors at NGV maintenance facilities, and are expected to form the basis for follow-on quantitative risk analysis work to address specific code requirements and identify effective accident prevention and mitigation strategies.

  14. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2010

    SciTech Connect (OSTI)

    None

    2011-03-01

    This report summarizes the annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site in calendar year 2010. The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon, MS, Site is a federally owned site located in Lamar County, MS, approximately 12 miles west of Purvis, MS, and about 21 miles southwest of Hattiesburg, MS (Figure 1). The U.S. Department of Energy (DOE), a successor agency to the U.S. Atomic Energy Commission (AEC), is responsible for the long-term surveillance and maintenance of the 1,470-acre site. DOE's Office of Legacy Management (LM) is the operating agent for the surface and subsurface real estate.

  15. Modeling the reliability and maintenance costs of wind turbines using Weibull analysis

    SciTech Connect (OSTI)

    Vachon, W.A. [W.A. Vachon & Associates, Inc., Manchester, MA (United States)

    1996-12-31

    A general description is provided of the basic mathematics and use of Weibull statistical models for modeling component failures and maintenance costs as a function of time. The applicability of the model to wind turbine components and subsystems is discussed with illustrative examples of typical component reliabilities drawn from actual field experiences. Example results indicate the dominant role of key subsystems based on a combination of their failure frequency and repair/replacement costs. The value of the model is discussed as a means of defining (1) maintenance practices, (2) areas in which to focus product improvements, (3) spare parts inventory, and (4) long-term trends in maintenance costs as an important element in project cash flow projections used by developers, investors, and lenders. 6 refs., 8 figs., 3 tabs.

  16. Rules Establishing Minimum Standards Relating to Location, Design, Construction, and Maintenance of Onsite Wastewater Treatment Systems (Rhode Island)

    Broader source: Energy.gov [DOE]

    The purpose of these rules is to protect public health and the environment by establishing minimum standards for the proper location, design, construction and maintenance of onsite wastewater...

  17. Pacific Northwest National Laboratory Grounds Maintenance: Best Management Practice Case Studies #4 and #5 - Water Efficient Landscape and Irrigation (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2009-08-01

    FEMP Water Efficiency Best Management Practices #4 and #5 Case Study: Overview of the Pacific Northwest National Laboratory grounds maintenance program and results.

  18. EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

    SciTech Connect (OSTI)

    Harris, S.; Gross, R.; Mitchell, E.

    2011-01-18

    The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

  19. RFEDSCHK User`s Manual (The RFEDS Lab Data Check routine), Environmental and Scientific Systems Information Resources: Version 1.00

    SciTech Connect (OSTI)

    Not Available

    1992-05-01

    The RFEDS Laboratory Data Check routine (RFEDSCHK) preforms checks of the off-site laboratory data to identify missing and/or incorrect data which may exist. The check routine is designed to assist the laboratories to correct deficiencies contained in the data before it is sent to the Rocky Flats Environmental Management Department, there-by improving the quality of the data being placed in RFEDS. If the data passes the checks with no errors, the data will be acceptable for placement into RFEDS and delivery of the electronic data to EG&G is appropriate. If errors are detected, the laboratory should correct the errors and perform the check again until the data is free of errors.

  20. Y-12 Groundwater Protection Program Monitoring Well Inspection And Maintenance Plan

    SciTech Connect (OSTI)

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for:  inspecting the physical condition of monitoring wells at Y-12,  determining maintenance needs that extend the life of a well, and  identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment.

  1. Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

    SciTech Connect (OSTI)

    2013-09-01

    This document is the fourth revision of the Monitoring Well Inspection and Maintenance Plan for groundwater monitoring wells installed at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes.

  2. ANALYSIS OF SAFETY RELIEF VALVE PROOF TEST DATA TO OPTIMIZE LIFECYCLE MAINTENANCE COSTS

    SciTech Connect (OSTI)

    Gross, Robert; Harris, Stephen

    2007-08-01

    Proof test results were analyzed and compared with a proposed life cycle curve or hazard function and the limit of useful life. Relief valve proof testing procedures, statistical modeling, data collection processes, and time-in-service trends are presented. The resulting analysis of test data allows for the estimation of the PFD. Extended maintenance intervals to the limit of useful life as well as methodologies and practices for improving relief valve performance and reliability are discussed. A generic cost-benefit analysis and an expected life cycle cost reduction concludes that $90 million maintenance dollars might be avoided for a population of 3000 valves over 20 years.

  3. Stochastic Modeling of Future Highway Maintenance Costs for Flexible Type Highway Pavement Construction Projects 

    E-Print Network [OSTI]

    Kim, Yoo Hyun

    2012-07-16

    OF TABLES Page Table 1. Categorized climate region used in California (Caltrans 2007) ................. 6 Table 2. Total lane-mile of Texas highways in 2005 (Mikhail et al. 2006) ............ 15 Table 3. Maintenance categories defined in Maintenance... are as shown in Table 2. Table 2. Total lane-mile of Texas highways in 2005 (Mikhail et al. 2006) Highway type Asphalt Concrete Pavement(ACP) Continuously Reinforced Concrete Pavement (CRCP) Jointed Concrete Pavement(JCP) Total IH 4,745 1,346 244 6...

  4. Post-Closure Inspection, Sampling, and Maintenance Report for the Salmon, Mississippi, Site Calendar Year 2011

    SciTech Connect (OSTI)

    None

    2012-03-01

    This report summarizes the 2011 annual inspection, sampling, measurement, and maintenance activities performed at the Salmon, Mississippi, Site (Salmon site1). The draft Long-Term Surveillance and Maintenance Plan for the Salmon Site, Lamar County, Mississippi (DOE 2007) specifies the submittal of an annual report of site activities with the results of sample analyses. The Salmon site consists of 1,470 acres. The site is located in Lamar County, Mississippi, approximately 10 miles west of Purvis, Mississippi, and about 21 miles southwest of Hattiesburg, Mississippi.

  5. Essential Systems Functionality Inspection Criteria, Approach, and Lines of Inquiry, October 16, 2008 (HSS CRAD 64-11 Rev. 2)

    Broader source: Energy.gov [DOE]

    The Essential Systems Functionality (ESF) inspection will evaluate the effectiveness of programs and processes for engineering design and safety basis, construction and installation, configuration management, surveillance testing, maintenance, operations, cognizant system engineer (CSE) and safety system oversight (SSO), and feedback and improvement of selected safety systems. This review will evaluate the effectiveness in maintaining the functionality of these safety systems. The ESF review will be performed in the context of integrated safety management (ISM), although the inspection criteria, activities and lines of inquiry are organized by ESF functional areas rather than ISM principles and core functions.

  6. Terahertz in-line digital holography of dragonfly hindwing: amplitude and phase reconstruction at enhanced resolution by extrapolation

    E-Print Network [OSTI]

    Rong, Lu; Wang, Dayong; Zhou, Xun; Huang, Haochong; Li, Zeyu; Wang, Yunxin

    2014-01-01

    We report here on terahertz (THz) digital holography on a biological specimen. A continuous-wave (CW) THz in-line holographic setup was built based on a 2.52 THz CO2 pumped THz laser and a pyroelectric array detector. We introduced novel statistical method of obtaining true intensity values for the pyroelectric array detector's pixels. Absorption and phase-shifting images of a dragonfly's hind wing were reconstructed simultaneously from single in-line hologram. Furthermore, we applied phase retrieval routines to eliminate twin image and enhanced the resolution of the reconstructions by hologram extrapolation beyond the detector area. The finest observed features are 35 {\\mu}m width cross veins.

  7. Test bench to commission a third ion source beam line and a newly designed extraction system

    SciTech Connect (OSTI)

    Winkelmann, T.; Cee, R.; Haberer, T.; Naas, B.; Peters, A.

    2012-02-15

    The HIT (Heidelberg Ion Beam Therapy Center) is the first hospital-based treatment facility in Europe where patients can be irradiated with protons and carbon ions. Since the commissioning starting in 2006 two 14.5 GHz electron cyclotron resonance ion sources are routinely used to produce a variety of ion beams from protons up to oxygen. In the future a helium beam for regular patient treatment is requested, therefore a third ion source (Supernanogan source from PANTECHNIK S.A.) will be integrated. This third ECR source with a newly designed extraction system and a spectrometer line is installed at a test bench at HIT to commission and validate this section. Measurements with different extraction system setups will be presented to show the improvement of beam quality for helium, proton, and carbon beams. An outlook to the possible integration scheme of the new ion source into the production facility will be discussed.

  8. NSLS-II Transport Line Progress

    SciTech Connect (OSTI)

    Fliller R. P.; Wahl, W.; Anderson, A.; Benish, B.; DeBoer, W.; Ganetis, G.; Heese, R.; Hseuh, H.-C.; Hu, J.-P.; Johanson, M.P.; Kosciuk, B.N.; Padrazo, D.; Roy, K.; Shaftan, T.; Singh, O.; Tuozzolo, J.; Wang, G.

    2012-05-20

    The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

  9. Single transmission line data acquisition system

    DOE Patents [OSTI]

    Fasching, George E. (Morgantown, WV)

    1984-01-01

    A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

  10. Wilson Line Integrals in the Unparticle Action

    E-Print Network [OSTI]

    A. Lewis Licht

    2008-05-25

    We consider the unparticle action that is made gauge invariant by inclusion of an open Wilson line factor. In deriving vertexes from such an action it has been customary to use a form of differentiating the Wilson line originally proposed by Mandelstam. Using a simple example, we show that the Mandelstam derivative is mathematically inconsistent. We show that there are two ways to define differentiation of the Wilson line. The mathematically consistent method is to differentiate the explicit dependence of the line on the endpoint. The other method is a functional derivative and corresponds in a limiting case to the Mandelstam derivative. We also show that the only path that can be used in the Wilson line integral that leaves the unparticle action both Poincare and scale invariant is the straight line.

  11. Gamma-Ray Line Observations with RHESSI

    E-Print Network [OSTI]

    David M. Smith

    2004-04-30

    The Reuven Ramaty High Energy Solar Spectroscopic Imager (RHESSI) has been observing gamma-ray lines from the Sun and the Galaxy since its launch in February 2002. Here I summarize the status of RHESSI observations of solar lines (nuclear de-excitation, neutron capture, and positron annihilation), the lines of $^{26}$Al and $^{60}$Fe from the inner Galaxy, and the search for positron annihilation in novae.

  12. Northern Pass Transmission Line Project Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On...

  13. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  14. Detonator comprising a nonlinear transmission line

    DOE Patents [OSTI]

    Elizondo-Decanini, Juan M

    2014-12-30

    Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

  15. DOE Sustainability Reporting Open Line Help Call

    Broader source: Energy.gov [DOE]

    The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual sustainability reporting process. Representatives from the...

  16. Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System Equipment

    E-Print Network [OSTI]

    risk of wide-area bulk transmission system failures. The work makes use of two previously developed1 Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System for bulk transmission equipment that is based on the cumulative long-term risk caused by each piece

  17. A study of the effects of preventive maintenance and test on nuclear plant availability

    SciTech Connect (OSTI)

    Engel, R.J.; Kitzmiller, J.T.; McCutchan, D.A.

    1986-06-01

    The purpose of this study is to investigate the effect of selected maintenance, operations, and organizational factors in the management of nuclear power stations. The fundamental criteria used throughout the study in making the determination between good and bad practices is the effect on unit availability.

  18. September 3-4, 2003/ARR Initial Assessment of Maintenance Scheme for 2-

    E-Print Network [OSTI]

    Raffray, A. René

    breeder blanket (or solid breeder) with ferritic steel and He-cooled divertor 3. Flibe-cooled ferritic boom* Space Available for Ports for NCSX-Based 3-Field Period Configuration (R=8.25 m) * Experimental -In-Torus Maintenance System for Fusion Reactors, FZKA-5830, Nov. 1966. #12;September 3-4, 2003/ARR 6

  19. CONFIGURATION AND MAINTENANCE OF THE ARIES-ST POWER PLANT X.R. Wang,a

    E-Print Network [OSTI]

    CONFIGURATION AND MAINTENANCE OF THE ARIES-ST POWER PLANT X.R. Wang,a M.S. Tillack,a F ARIES-ST is a 1000 MWe fusion power plant based on a low aspect ratio "spherical torus" (ST) plasma availability of the power plant. Mechanical joints are poss- ible in the normal conducting single-turn toroidal

  20. CONFIGURATION AND MAINTENANCE OF THE ARIES-ST POWER PLANT X.R. Wang,a

    E-Print Network [OSTI]

    Najmabadi, Farrokh

    CONFIGURATION AND MAINTENANCE OF THE ARIES-ST POWER PLANT X.R. Wang,a M.S. Tillack,a F Abstract- ARIES-ST is a 1000 MWe fusion power plant based on a low aspect ratio "spherical torus" (ST availability of the power plant. Mechanical joints are possible in the normal conducting single-turn toroidal

  1. Sox6 Up-Regulation by Macrophage Migration Inhibitory Factor Promotes Survival and Maintenance of Mouse

    E-Print Network [OSTI]

    Sox6 Up-Regulation by Macrophage Migration Inhibitory Factor Promotes Survival and Maintenance migration inhibitory factor (MIF) has important roles in supporting the proliferation and/or survival) of the adult mouse forebrain. Retroviral overexpression of Sox6 in NSPCs increases the number of primary

  2. Research article The SOS4 pyridoxal kinase is required for maintenance of vitamin

    E-Print Network [OSTI]

    Daub, Margaret

    Research article The SOS4 pyridoxal kinase is required for maintenance of vitamin B6-mediated t Vitamin B6 (pyridoxal 50 -phosphate and its vitamers) is an important cofactor in numerous enzymatic reactions. In spite of its importance, the consequences of altering vitamin B6 content on plant growth

  3. Maintenance Scheduling of Oil Storage Tanks using Tabu-based Genetic Algorithm *

    E-Print Network [OSTI]

    Chen, Shu-Ching

    petroleum vendors can sell their oil products in Taiwan now. This liberalization results in high competitionMaintenance Scheduling of Oil Storage Tanks using Tabu-based Genetic Algorithm * Sheng-Tun Li1 and the recently liberalized Petroleum Management Law, the oil market in Taiwan is liberalized and thus is becoming

  4. Implementation Guide for Surveillance and Maintenance during Facility Transition and Disposition

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-09-29

    As DOE facilities complete mission operations and are declared excess, they pass into a transition phase that ultimately prepares them for disposition. The disposition phase of a facility's life cycle usually includes deactivation, decommissioning, and surveillance and maintenance (S&M) activities.

  5. Mobile Monitoring and Maintenance of Power Systems Bing JIANG and Alexander V. MAMISHEV

    E-Print Network [OSTI]

    Mamishev, Alexander

    and monitoring of power systems to ensure high quality and reliability of electric power supplied to customers networks in the new environment. Monitoring of electric power systems in real-time for reliability, agingMobile Monitoring and Maintenance of Power Systems Bing JIANG and Alexander V. MAMISHEV Sensors

  6. The Construction and Maintenance Plan for a Grand Banks Multi-Purpose Pipeline

    E-Print Network [OSTI]

    Bruneau, Steve

    The Construction and Maintenance Plan for a Grand Banks Multi-Purpose Pipeline D.W. (Don) Wilson, Director, North Atlantic Pipeline Partners, L.P. NOIA 2000 Conference June, 2000 #12;Grand Banks Multi-Purpose Pipeline Route January 2000 Grand Banks of Newfoundland Newfoundland Come by Chance St. John's Argentia 50o

  7. Effects of Monensin and Dietary Energy Intake on Maintenance Requiements in Beef Cows 

    E-Print Network [OSTI]

    Boardman, Caleb Jay

    2015-05-29

    maintenance energy requirements. Both projects were designed to feed one diet at either 120% (H) or 80% (L) of NRC requirements with either 0 or 200 mg?hd-1?d-1 of monensin. Forty cows were fed for 56 d to determine performance, while sixteen ruminally...

  8. DUNES: A PerformanceOriented System Support Environment for Dependency Maintenance in Workstation Networks \\Lambda

    E-Print Network [OSTI]

    Park, Kihong

    DUNES: A Performance­Oriented System Support Environment for Dependency Maintenance in Workstation of performance fea­ tures, their properties, and implementation in a sys­ tem support environment called DUNES where both communication and computation costs are explicitly taken into account. DUNES' architecture

  9. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency Release 3.0

    SciTech Connect (OSTI)

    none,

    2010-08-01

    This Operations and Maintenance (O&M) Best Practices Guide was developed under the direction of the U.S. Department of Energy’s Federal Energy Management Program (FEMP). The mission of FEMP is to facilitate the Federal Government’s implementation of sound, cost effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

  10. JOURNAL OF SOFTWARE MAINTENANCE AND EVOLUTION: RESEARCH AND PRACTICE J. Softw. Maint. Evol.: Res. Pract. (2011)

    E-Print Network [OSTI]

    Poshyvanyk, Denys

    2011-01-01

    JOURNAL OF SOFTWARE MAINTENANCE AND EVOLUTION: RESEARCH AND PRACTICE J. Softw. Maint. Evol.: Res. Pract. (2011) Published online in Wiley Online Library (wileyonlinelibrary.com). DOI: 10.1002/smr.530 Assigning change requests to software developers Huzefa Kagdi1,,, Malcom Gethers2, Denys Poshyvanyk2

  11. IMPROVING UTILITY OPERATION AND MAINTENANCE THROUGH THE USE OF M.J.G. Brussela

    E-Print Network [OSTI]

    IMPROVING UTILITY OPERATION AND MAINTENANCE THROUGH THE USE OF GIS M.J.G. Brussela and Amr Mohamed Institute, Ministry of Housing and Public Utilities, Egypt, 87 Tahrir Street, Dokki, Giza,, P.O.Box.1770 Utilities and waste management ABSTRACT: Infrastructure networks are vital to cities, to ensure the well

  12. The estimation of fuel cell operating time for predictive maintenance R. Onanena a,b,c

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    1 The estimation of fuel cell operating time for predictive maintenance strategies R. Onanena a of the limiting factors for the spreading of the fuel cell technology is the durability and researches to extend fuel cell operating time based on electrochemical impedance spectroscopy measurements. It consists

  13. Secure Operation, Control and Maintenance of Future E-enabled Airplanes

    E-Print Network [OSTI]

    Poovendran, Radha

    Secure Operation, Control and Maintenance of Future E-enabled Airplanes Krishna Sampigethaya, Seattle, WA 98195, USA Abstract--Commercial aviation is at the threshold of the era of the e to the onboard aviation information systems and impede their operation. The emerging security threats

  14. Temperature dependence of metabolic rates for microbial growth, maintenance, and survival

    E-Print Network [OSTI]

    Price, P. Buford

    , energy sources, room for growth, and no predators, some microbial species can double in about an hourTemperature dependence of metabolic rates for microbial growth, maintenance, and survival P. Buford nutrient in ice and permafrost, with implica- tions for past or present microbial life in Martian

  15. Maintenance Scheduling of Oil Storage Tanks using Tabu-based Genetic Algorithm *

    E-Print Network [OSTI]

    Chen, Shu-Ching

    days or 50,000 kiloliters. Therefore, they unavoidably have to rent tanks from the domestic oilMaintenance Scheduling of Oil Storage Tanks using Tabu-based Genetic Algorithm * Sheng-Tun Li1 and the recently liberalized Petroleum Management Law, the oil market in Taiwan is liberalized and thus is becoming

  16. Energy Efficient Operations and Maintenance Practices In New York State Buildings

    E-Print Network [OSTI]

    Smerdon, Jason E.

    Energy Efficient Operations and Maintenance Practices In New York State Buildings Columbia and implementation of energy efficient O&M practices in New York State government buildings. We would like to extend EUI Energy Use Intensity, often measured in kBtu per gross square foot of building area NYPA New York

  17. preprint version RSS 2012, Sydney, Australia Rigidity Maintenance Control for Multi-Robot Systems

    E-Print Network [OSTI]

    preprint version RSS 2012, Sydney, Australia Rigidity Maintenance Control for Multi-Robot Systems. Email: hhb@tuebingen.mpg.de Abstract--Rigidity of formations in multi-robot systems is important controller for a multi-agent robot team. To develop such a controller, we first provide an alternative

  18. NATIONAL CENTRE FOR BIOLOGICAL SCIENCES Annual Maintenance Contract for Electrical Systems in

    E-Print Network [OSTI]

    Udgaonkar, Jayant B.

    Maintenance Contract for Electrical systems including substations in Mandara hostel-CB site, NCBS : Rs.47,729.00 4. COST OF TENDER DOCUMENT : Rs. 500/- 5. SALE PERIOD : 13/12/2013 TO 23/12/2013 6. TIME:________________DATE:____________ __________________________________ FOR A SUM OF RS. ________________ TOWARDS __________________________________THE COST OF TENDER DOCUMENT

  19. Mesh-based Sensor Relocation for Coverage Maintenance in Mobile Sensor Networks

    E-Print Network [OSTI]

    Santoro, Nicola

    sophisticated protocols, mobile sensor networks are more flexible and adaptive to unknown or hazardous of reasons. All of them rely on global/cross-network message transmissions for discovering nearby replacementMesh-based Sensor Relocation for Coverage Maintenance in Mobile Sensor Networks Xu Li SCS, Carleton

  20. SYSTEM APPROACH-BASED BAYESIAN NETWORK TO AID MAINTENANCE OF MANUFACTURING PROCESS

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    for manufacturing systems. In addition, recent works on system safety and Bayesian Networks (BNs) are developedSYSTEM APPROACH-BASED BAYESIAN NETWORK TO AID MAINTENANCE OF MANUFACTURING PROCESS Weber P., Suhner explores a new methodology to develop Bayesian Network-based diagnosis and prognosis aids for manufacturing

  1. High-Frequency Auditory Feedback Is Not Required for Adult Song Maintenance in Bengalese Finches

    E-Print Network [OSTI]

    Rubel, Edwin

    High-Frequency Auditory Feedback Is Not Required for Adult Song Maintenance in Bengalese Finches encode high frequen- cies, and low frequencies are encoded in progressively apical regions. We restricted frequencies or those encoding both high and low frequencies and documented resultant changes in song. Birds

  2. Mobile Agent Software Applied in Maintenance Scheduling X. Xu M. Kezunovic

    E-Print Network [OSTI]

    Mobile Agent Software Applied in Maintenance Scheduling X. Xu M. Kezunovic Department of Electrical different entities is required. In this paper, the mobile agent software is applied in the facility consuming and error-prone. The Concordia mobile agent software provides a flexible framework for mobile

  3. The estimated costs of corn, corn silage, soybeans, alfalfa, and pasture maintenance in this report are

    E-Print Network [OSTI]

    Duffy, Michael D.

    The estimated costs of corn, corn silage, soybeans, alfalfa, and pasture maintenance in this report summaries, production and costs data from the Depart- ments of Economics, Agricultural and Biosystems and other input suppliers around the state. These costs estimates are representative of average costs

  4. What is the VITAL-EQA Program? The maintenance of high quality laboratories

    E-Print Network [OSTI]

    What is the VITAL-EQA Program? The maintenance of high quality laboratories measuring biochemical), in collaboration with Wageningen University in the Netherlands, established the VITAL-EQA program. The VITAL of analysis and increase the confidence level of the laboratory. Participation in VITAL-EQA is voluntary

  5. A Predictive Maintenance Policy Based on the Blade of Offshore Wind Wenjin Zhu, Troyes University of Technology

    E-Print Network [OSTI]

    McCalley, James D.

    A Predictive Maintenance Policy Based on the Blade of Offshore Wind Turbine Wenjin Zhu, Troyes onshore to offshore locations [1]. As offshore wind turbines are located at remote sites withlimited]. Operation and maintenance (O&M) costs of off-shore wind turbines contribute about 25-30% to the total energy

  6. Terahertz Quantum-Cascade Transmission-Line Metamaterials

    E-Print Network [OSTI]

    Tavallaee, Amir Ali

    2012-01-01

    Transmission-Line Metamaterials . . . . . . . Terahertz CRLHCRLH Transmission-Line Metamaterials . . . . . . . 112losses in negative-index metamaterials by optical parametric

  7. Magnetic Field Line Stickiness in Tokamaks

    E-Print Network [OSTI]

    Martins, Caroline G L; Caldas, I L

    2013-01-01

    We present simulated figures of the diverted magnetic field lines of the tokamak ITER, obtained by numerically integrating a Hamiltonian model with electrical currents in five wire loops and control coils. We show evidences of a sticky island embedded in the chaotic region near the divertor plates, which traps magnetic field lines for many toroidal turns increasing their connection lengths to these plates.

  8. Line geometry and electromagnetism I: basic structures

    E-Print Network [OSTI]

    D. H. Delphenich

    2013-09-11

    Some key notions of line geometry are recalled, along with their application to mechanics. It is then shown that most of the basic structures that one introduces in the pre-metric formulation of electromagnetism can be interpreted directly in terms of corresponding concepts in line geometry. The results are summarized in a table.

  9. Cesium D Line Data Daniel Adam Steck

    E-Print Network [OSTI]

    Steck, Daniel A.

    Cesium D Line Data Daniel Adam Steck Oregon Center for Optics and Department of Physics, University 1998. This is revision 2.1.4, 23 December 2010. Cite this document as: Daniel A. Steck, "Cesium D Line and optical properties of cesium that are relevant to various quantum optics experiments. In particular, we

  10. Migrating Automotive Product Lines: a Case Study

    E-Print Network [OSTI]

    Cordy, James R.

    . Software Product Lines (SPL) are widely used to manage variability in the automotive industry. In a rapidly study from an automotive domain, that it is tractable to lift industrial-grade transforma- tionsMigrating Automotive Product Lines: a Case Study Michalis Famelis1 , Levi L´ucio2 , Gehan Selim3

  11. Doering 6/2004 Freezing Cell Lines

    E-Print Network [OSTI]

    Doering, Tamara

    Doering 6/2004 Freezing Cell Lines Overview: This is crucial for maintaining important cell lines in the lab!!! Please freeze down any strain you or others might use in the future, whether that is a crypto personnel won't spend time reconstructing plasmids or strains that weren't kept. Instructions for freezing

  12. Speed-line for 3D animation 

    E-Print Network [OSTI]

    Song, Won Chan

    2007-04-25

    My thesis describes a tool which creates speed-lines automatically in 3D computer animations. Speed-lines are usually used in comic books to express fast motions in a still image. They are also used in 2D animations. Although animations don't need...

  13. Broad iron lines in Active Galactic Nuclei

    E-Print Network [OSTI]

    A. C. Fabian; K. Iwasawa; C. S. Reynolds; A. J. Young

    2000-04-26

    An intrinsically narrow line emitted by an accretion disk around a black hole appears broadened and skewed as a result of the Doppler effect and gravitational redshift. The fluorescent iron line in the X-ray band at 6.4-6.9keV is the strongest such line and is seen in the X-ray spectrum of many active galactic nuclei and, in particular, Seyfert galaxies. It is an important diagnostic with which to study the geometry and other properties of the accretion flow very close to the central black hole. The broad iron line indicates the presence of a standard thin accretion disk in those objects, often seen at low inclination. The broad iron line has opened up strong gravitational effects around black holes to observational study with wide-reaching consequences for both astrophysics and physics.

  14. Through the Looking Glass: Off-Line Versus On-Line Coverage of Planar Environments by

    E-Print Network [OSTI]

    Rimon, Elon

    is demonstrated. Due to its many applications, on-line coverage is a highly researched topic in the mobile robotThrough the Looking Glass: Off-Line Versus On-Line Coverage of Planar Environments by a Battery Powered Autonomous Mobile Robot Iddo Shnaps and Elon Rimon Dept. of ME, Technion, Israel Institute

  15. Ethan Burns (UNH) Anticipatory On-line Planning 1 / 22 Anticipatory On-line Planning

    E-Print Network [OSTI]

    Ruml, Wheeler

    Ethan Burns (UNH) Anticipatory On-line Planning ­ 1 / 22 Anticipatory On-line Planning Ethan Burns1 Formalization Hindsight Opt. Experiments Conclusion Ethan Burns (UNH) Anticipatory On-line Planning ­ 2 / 22'd s Contributions Formalization Hindsight Opt. Experiments Conclusion Ethan Burns (UNH) Anticipatory On

  16. ALARA Review of the Spallation Neutron Source Accumulator Ring and Transfer Lines

    SciTech Connect (OSTI)

    Haire, M.J.

    2003-06-30

    The Spallation Neutron Source (SNS) is designed to meet the growing need for new tools that will deepen our understanding in materials science, life science, chemistry, fundamental and nuclear physics, earth and environmental sciences, and engineering sciences. The SNS is an accelerator-based neutron-scattering facility that when operational will produce an average beam power of 2 MW at a repetition rate of 60 Hz. The accelerator complex consists of the front-end systems, which will include an ion source; a 1-GeV full-energy linear accelerator; a single accumulator ring and its transfer lines; and a liquid mercury target. This report documents an as-low-as-reasonably-achievable (ALARA) review of the accumulator ring and transfer lines at their early design stage. An ALARA working group was formed and conducted a review of the SNS ring and transfer lines at the {approx}25% complete design stage to help ensure that ALARA principles are being incorporated into the design. The radiological aspects of the SNS design criteria were reviewed against regulatory requirements and ALARA principles. Proposed features and measures were then reviewed against the SNS design criteria. As part of the overall review, the working group reviewed the design manual; design drawings and process and instrumentation diagrams; the environment, safety, and health manual; and other related reports and literature. The group also talked with SNS design engineers to obtain explanations of pertinent subject matter. The ALARA group found that ALARA principles are indeed being incorporated into the early design stage. Radiation fields have been characterized, and shielding calculations have been performed. Radiological issues are being adequately addressed with regard to equipment selection, access control, confinement structure and ventilation, and contamination control. Radiation monitoring instrumentation for worker and environment protection are also being considered--a good practice at this early design stage. The ring and transfer lines are being designed for hands-on maintenance. The SNS beam loss criteria, which determine radiation dose design, are a factor of {approx}30 lower than the lowest that has been achieved at any existing proton synchrotron and accumulator rings. This demonstrates that ALARA considerations are an important part of SNS design. A noteworthy example of the ALARA principal being incorporated into the SNS is the hybrid ring lattice design recently approved by the SNS change control process. The new lattice design increases calculated acceptance by about 50% and improves the expected collimator efficiency from 80 to 95%. As a result, the expected calculated beam loss rate, and resulting radiation dose rates, are significantly improved. Another major design change with ALARA implications was the change from an alpha to an omega configuration for the high-energy beam transport (HEBT) system, ring, and ring-to-target beam transport (RTBT) system. Because of this change, the ring and transfer lines will have crane coverage, eliminating the need for personnel to be near activated equipment for repair and removal. By using the crane, extensive shielding can be placed around highly radioactive equipment (e.g., collimators), and the equipment can be moved by remote control. As part of the change from an alpha to omega configuration, the tunnel width was increased by 2 ft. This increased width will allow easier access to failed equipment, reducing radiation exposure time to workers during maintenance and repair. In addition, a personnel entrance was added to the ring between the HEBT and RTBT so that personnel will not have to enter this area directly through the HEBT or RTBT. This addition will shorten the travel distance, and therefore the time, that personnel performing maintenance work on radioactive equipment will need to be in the area, reducing potential dose. In the RTBT beam line, a hatchway will be placed above the collimators and quad doublet magnets near the target to facilitate their removal. This design was chosen in lieu

  17. SU-E-T-462: Fixed-Jaw Optimization for Critical Structure Sparing in IMRT Treatment Planning: Beam Modeling Cautions for Non-Routine Use

    SciTech Connect (OSTI)

    Price, R; Veltchev, I; Cherian, G; Ma, C [Chase Cancer Center, Philadelphia, PA (United States)

    2014-06-01

    Purpose: Multiple publications exist concerning fixed-jaw utilization to avoid linac carriage shifts and reduce intensity modulated radiotherapy (IMRT) treatment times. The purpose of this work is to demonstrate delivery QA discrepancies and illustrate the need for improved treatment planning system (TPS) commissioning for non-routine use. Methods: A 6cm diameter spherical target was delineated on a virtual phantom containing the Iba Matrixx linear array within the Varian Eclipse TPS. Optimization was performed for target coverage for the following 3 scenarios: a single open, zero degree field where the X and Y jaws completely cover the target; the same field using an asymmetric, fixed-jaw technique where the upper Y jaw does not cover the superior 2cm of the target; and both of the aforementioned directed at the target at 315 and 45 degree gantry angles, respectively. This final orientation was also irradiated on a linac for delivery analysis. A sarcoma patient case was also analyzed where the fixed jaw technique was utilized for kidney sparing. Results: The open beam results were as predicted but the fixed-jaw results demonstrate a pronounced fluence increase along the asymmetric, upper jaw. Analysis of the delivery of the combined beam plan Resultin 83% of pixels evaluated passing gamma criteria of 3%, 3mm DTA. Analysis for the sarcoma patient, in the plane of the shielded kidney, indicated 93% passing although the maximum dose discrepancies in this region were approximately 23%. Conclusion: Optimization within the target is routinely performed using MLC leaf-end characteristics. The fixed-jaw technique forces optimization of target coverage to utilize the penumbra profiles of the associated beamdefining jaw. If the profiles were collected using a common 0.125cc ionization chamber, the resolution may be insufficient resulting in a planvs.-delivery mismatch. It is recommended that high-resolution beam characteristics be considered when non-routine planning methods are utilized.

  18. SICS. A Sensor-Based In-Line Control System for the Surfaces of Continuously Cast Slabs

    SciTech Connect (OSTI)

    Chang, Tzyy-Shuh [OG Technologies, Inc., Ann Arbor, MI (United States)

    2013-09-23

    The Phase II project has been carried out in accordance to the proposed tasks and budget, based on the original and extended schedule. The R&D team designed and implemented the test unit for the full width coverage, installed the unit in a caster. The development work further included enhanced image processing, in-depth defect study and process control models. The function, operation, and maintenance of the SICS was thoroughly studied during the Phase II research. The experience indicates additional hardware and procedures are required to make the SICS a commercially ready product in operation and maintenance aspect. Such developments have been finished and the team is contacting potential customers for the first commercial installation of SICS. Additionally, OGT is exploring the possibility to team up with a US company that specializes in surface cleaning for slabs/blooms/billets such that the in-line surface inspection can be integrated with in-line surface clean up for the maximum benefit to the steel industry.

  19. Transferring Capital Equipment To Surplus First you need to find the asset you wish to surplus. On the Main Menu screen under the Lookup and Maintenance box

    E-Print Network [OSTI]

    . On the Main Menu screen under the Lookup and Maintenance box in the middle of the screen look under

  20. Second Line of Defense Master Spares Catalog

    SciTech Connect (OSTI)

    Henderson, Dale L.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.

    2012-11-20

    This catalog is intended to be a comprehensive listing of repair parts, components, kits, and consumable items used on the equipment deployed at SLD sites worldwide. The catalog covers detection, CAS, network, ancillary equipment, and tools. The catalog is backed by a Master Parts Database which is used to generate the standard report views of the catalog. The master parts database is a relational database containing a record for every part in the master parts catalog along with supporting tables for normalizing fields in the records. The database also includes supporting queries, database maintenance forms, and reports.

  1. Computing Criticality of Lines in Power Systems

    SciTech Connect (OSTI)

    Pinar, Ali; Reichert, Adam; Lesieutre, Bernard

    2006-10-13

    We propose a computationally efficient method based onnonlinear optimization to identify critical lines, failure of which cancause severe blackouts. Our method computes criticality measure for alllines at a time, as opposed to detecting a single vulnerability,providing a global view of the system. This information on criticality oflines can be used to identify multiple contingencies by selectivelyexploring multiple combinations of broken lines. The effectiveness of ourmethod is demonstrated on the IEEE 30 and 118 bus systems, where we canvery quickly detect the most critical lines in the system and identifysevere multiple contingencies.

  2. Standard Practice for Corrosion of Aircraft Metals by Total Immersion in Maintenance Chemicals

    E-Print Network [OSTI]

    American Society for Testing and Materials. Philadelphia

    2009-01-01

    1.1 This practice covers the determination of the corrosiveness of tank-type aircraft maintenance chemicals on aircraft metals and the corrodibility of metals in these maintenance chemicals with time. The determination is made under conditions of total immersion by a combination of weight change measurements and visual qualitative determinations of change. 1.2 The values stated in SI units are to be regarded as the standard. The values given in parentheses are for information only. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific precautions, see Section 6.

  3. The selection and maintenance of valves for the control of fugitive emissions

    SciTech Connect (OSTI)

    Dresch, C. (NIBCO Inc., Elkhart, IN (United States))

    1994-08-01

    The pulp and paper industry has long needed valves that (a) have extremely low stem leakage when they are new and (b) need little or no maintenance to retain that low leakage over their service life. The EPA fugitive emission regulations provide additional impetus for the pulp and paper industry to buy such valves and for the valve and packing industry to produce such valves. Even if particular operations are not covered by the fugitive emissions regulations, it is--and always has been--in a mill's best interest to have valves whose stems don't leak and need little or no maintenance to prevent that leakage. The paper gives some recommendations on how to meet that objective: selection the right packing materials; apply the right amount of stress to the packing; install the packing correctly; and use rotary valves where practical.

  4. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair; Veers, Paul S.

    2009-09-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a list of the data needed to support reliability and availability analysis, and gives specific recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of fielded wind turbines. This report is intended to help the reader develop a basic understanding of what data are needed from a Computerized Maintenance Management System (CMMS) and other data systems, for reliability analysis. The report provides: (1) a list of the data needed to support reliability and availability analysis; and (2) specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and a wider variety of analysis and reporting needs.

  5. Application and development of technologies for engine-condition-based maintenance of emergency diesel generators

    SciTech Connect (OSTI)

    Choi, K. H.; Sang, G.; Choi, L. Y. S.; Lee, B. O. [Korea Hydro and Nuclear Power Company Central Research Institue, 70, 1312 -gil Yuseong-daero Yuseong-gu, Daejeon 305-343 (Korea, Republic of)

    2012-07-01

    The emergency diesel generator (EDG) of a nuclear power plant has the role of supplying emergency electric power to protect the reactor core system in the event of the loss of offsite power supply. Therefore, EDGs should be subject to periodic surveillance testing to verify their ability to supply specified frequencies and voltages at design power levels within a limited time. To maintain optimal reliability of EDGs, condition monitoring/diagnosis technologies must be developed. Changing from periodic disassemble maintenance to condition-based maintenance (CBM) according to predictions of equipment condition is recommended. In this paper, the development of diagnosis technology for CBM and the application of a diesel engine condition-analysis system are described. (authors)

  6. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    SciTech Connect (OSTI)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  7. Natural resources management activities and biodiversity maintenance. Progress report, July 1, 1993--June 30, 1994

    SciTech Connect (OSTI)

    Caudell, M.B.

    1994-05-01

    This progress report briefly outlines activities at the Crackerneck Wildlife Management Area. Thirty-nine days were spent administering hunts with 1524 people participating. Biological data was collected on 89 deer, 6 turkeys, 8 feral hogs, 40 ducks of two species, 24 bobwhite, 3 rabbits, 2 gray squirrels, and 313 fish of 8 species. Public relations, maintenance and hunt preparation activities are summarized as well.

  8. Data collection, storage and integration requirements torealistically assess State road maintenance needs 

    E-Print Network [OSTI]

    Prodhuturi, Venkat R.

    1997-01-01

    Management Information System (MMIS), Salary and Labor Distribution System (SLD), Equipment Operating System (EOS), and Material Supply Management System (MSMS). The Single Entry Screen System (SES) was developed to allow input of data related to a... databases. These databases can be grouped according to their functions into: Maintenance Related Databases (MMS, SLD, EOS, MSMS) Pavement Related Databases (TRM, RIS, RIA, PMIS, RLSE) Bridge Related Databases (BRINSAP) 10 Construction related databases...

  9. Operations and Maintenance Concept Plan for the Immobilized High Level Waste (IHLW) Interim Storage Facility

    SciTech Connect (OSTI)

    JANIN, L.F.

    2000-08-30

    This O&M Concept looks at the future operations and maintenance of the IHLW/CSB interim storage facility. It defines the overall strategy, objectives, and functional requirements for the portion of the building to be utilized by Project W-464. The concept supports the tasks of safety basis planning, risk mitigation, alternative analysis, decision making, etc. and will be updated as required to support the evolving design.

  10. Temperatures in the blast furnace refractory lining

    SciTech Connect (OSTI)

    Hebel, R.; Streuber, C. [Didier-M and P Energietechnik GmbH, Wiesbaden (Germany); Steiger, R. [Didier-M and P Engineering Services, Highland, IN (United States); Jeschar, R. [TU Clausthal (Germany). Inst. fuer Energieverfahrenstechnik und Brennstofftechnik

    1995-12-01

    The campaign life duration of a blast furnace is mainly determined by the condition of the refractory lining in heavy-duty zones such as the hearth, bosh, belly and lower stack. To achieve a desired lifetime, the temperature of the lining in these areas thereby proved to be the decisive controllable parameter. Low operating temperatures result in prolonged service life and are attained through high cooling efficiency. Besides the refractory grade chosen, the wear profile is mainly determined by the type of cooling system applied and the cooling intensity. Therefore, an appropriate compromise between long service life and energy losses has to be found in each case. In order to predict the service life of a lining it is important to know the wear condition at all times during the campaign. The paper describes the approaches the authors have made so far on European blast furnaces, on a theoretical and practical basis, on how to analyze the lining wear.

  11. DNA Assembly Line for Nano-Construction

    ScienceCinema (OSTI)

    Oleg Gang

    2010-01-08

    Building on the idea of using DNA to link up nanoparticles scientists at Brookhaven National Lab have designed a molecular assembly line for high-precision nano-construction. Nanofabrication is essential for exploiting the unique properties of nanoparticl

  12. Line Environment, Safety and Health Oversight

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-06-26

    Sets forth the Department's expectations line management environment, safety and health (ES&H) oversight and for the use of contractor self-assessment programs as the cornerstone for this oversight. Canceled by DOE O 226.1.

  13. Productivity Improvement of a Manual Assembly Line 

    E-Print Network [OSTI]

    Yerasi, Pranavi

    2012-10-19

    The current project addresses the productivity improvement of a manual assembly line by making use of operations analysis in the framework of Lean production. A methodology is proposed that helps to improve the productivity of any production process...

  14. Ames Lab 101: Next Generation Power Lines

    ScienceCinema (OSTI)

    Russell, Alan

    2012-08-29

    Ames Laboratory scientist Alan Russell discusses the need to develop new power lines that are stronger and more conductive as a way to address the problem of the nation's aging and inadequate power grid.

  15. On-line chemical composition analyzer development

    SciTech Connect (OSTI)

    Garrison, A.A.

    1993-01-01

    This report relates to the development of an on-line Raman analyzer for control of a distillation column. It is divided into: program issues, experimental control system evaluation, energy savings analysis, and reliability analysis. (DLC)

  16. Line-of-Sight Networks Alan Frieze

    E-Print Network [OSTI]

    Kleinberg, Jon

    -of-sight restrictions. Here we propose a random-graph model incorporating both range limitations and line-of-sight con- 0329064, CNS-0403340, and BCS-0537606; work done in part while on sabbatical leave at Carnegie Mellon

  17. Design of the ILC RTML Extraction Lines

    SciTech Connect (OSTI)

    Seletskiy, S.; Tenenbaum, P.; Walz, D.; Solyak, N.; /Fermilab

    2011-10-17

    The ILC [1] Damping Ring to the Main Linac beamline (RTML) contains three extraction lines (EL). Each EL can be used both for an emergency abort dumping of the beam and tune-up continual train-by-train extraction. Two of the extraction lines are located downstream of the first and second stages of the RTML bunch compressor, and must accept both compressed and uncompressed beam with energy spreads of 2.5% and 0.15%, respectively. In this paper we report on an optics design that allowed minimizing the length of the extraction lines while offsetting the beam dumps from the main line by the distance required for acceptable radiation levels in the service tunnel. The proposed extraction lines can accommodate beams with different energy spreads while at the same time providing the beam size acceptable for the aluminum dump window. The RTML incorporates three extraction lines, which can be used for either an emergency beam abort or for a train-by-train extraction. The first EL is located downstream of the Damping Ring extraction arc. The other two extraction lines are located downstream of each stage of the two-stage bunch compressor. The first extraction line (EL1) receives 5GeV beam with an 0.15% energy spread. The extraction line located downstream of the first stage of bunch compressor (ELBC1) receives both compressed and uncompressed beam, and therefore must accept beam with both 5 and 4.88GeV energy, and 0.15% and 2.5% energy spread, respectively. The extraction line located after the second stage of the bunch compressor (ELBC2) receives 15GeV beam with either 0.15 or 1.8% energy spread. Each of the three extraction lines is equipped with the 220kW aluminum ball dump, which corresponds to the power of the continuously dumped beam with 5GeV energy, i.e., the beam trains must be delivered to the ELBC2 dump at reduced repetition rate.

  18. Wind energy Computerized Maintenance Management System (CMMS) : data collection recommendations for reliability analysis.

    SciTech Connect (OSTI)

    Peters, Valerie A.; Ogilvie, Alistair B.

    2012-01-01

    This report addresses the general data requirements for reliability analysis of fielded wind turbines and other wind plant equipment. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific data recommendations for a Computerized Maintenance Management System (CMMS) to support automated analysis. This data collection recommendations report was written by Sandia National Laboratories to address the general data requirements for reliability analysis of operating wind turbines. This report is intended to help develop a basic understanding of the data needed for reliability analysis from a Computerized Maintenance Management System (CMMS) and other data systems. The report provides a rationale for why this data should be collected, a list of the data needed to support reliability and availability analysis, and specific recommendations for a CMMS to support automated analysis. Though written for reliability analysis of wind turbines, much of the information is applicable to a wider variety of equipment and analysis and reporting needs. The 'Motivation' section of this report provides a rationale for collecting and analyzing field data for reliability analysis. The benefits of this type of effort can include increased energy delivered, decreased operating costs, enhanced preventive maintenance schedules, solutions to issues with the largest payback, and identification of early failure indicators.

  19. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    SciTech Connect (OSTI)

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  20. Molecular Constraints on Synaptic Tagging and Maintenance of Long-Term Potentiation: A Predictive Model

    E-Print Network [OSTI]

    Paul Smolen; Douglas A. Baxter; John H. Byrne

    2012-08-03

    Protein synthesis-dependent, late long-term potentiation (LTP) and depression (LTD) at glutamatergic hippocampal synapses are well characterized examples of long-term synaptic plasticity. Persistent increased activity of the enzyme protein kinase M (PKM) is thought essential for maintaining LTP. Additional spatial and temporal features that govern LTP and LTD induction are embodied in the synaptic tagging and capture (STC) and cross capture hypotheses. Only synapses that have been "tagged" by an stimulus sufficient for LTP and learning can "capture" PKM. A model was developed to simulate the dynamics of key molecules required for LTP and LTD. The model concisely represents relationships between tagging, capture, LTD, and LTP maintenance. The model successfully simulated LTP maintained by persistent synaptic PKM, STC, LTD, and cross capture, and makes testable predictions concerning the dynamics of PKM. The maintenance of LTP, and consequently of at least some forms of long-term memory, is predicted to require continual positive feedback in which PKM enhances its own synthesis only at potentiated synapses. This feedback underlies bistability in the activity of PKM. Second, cross capture requires the induction of LTD to induce dendritic PKM synthesis, although this may require tagging of a nearby synapse for LTP. The model also simulates the effects of PKM inhibition, and makes additional predictions for the dynamics of CaM kinases. Experiments testing the above predictions would significantly advance the understanding of memory maintenance.

  1. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    SciTech Connect (OSTI)

    NONE

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training.

  2. Experiences with On-Line STEAMPOP 

    E-Print Network [OSTI]

    Nath, R.; Libby, D. J.; Marcinkowska, A. R.; Skarke, S. C.; Thomasson, M. J.; Worsham, B. A.

    1988-01-01

    manual step to complete the loop. The results of optimization have to be conveyed back to the plant computer responsible for assigning the control set points. In order to automate the above mentioned manual steps, the optimization program has...-Line STEAMPOP R. Nath, D. J. Libby, A. R. Marcinkowska, S. C. Skarke, M. J. Thomasson and B. A. Worsham Union Carbide Corporation Houston, Texas ABSTRACT Off-line utility system optimizers for large process plants are now common place [1...

  3. LoanSTAR Monitoring and Analysis Program: Presentation Summary of the State Capitol Complex Building Operation and Maintenance Field Test 

    E-Print Network [OSTI]

    Turner, W. D.; Houcek, J. K.; Liu, M.; Claridge, D. E.

    1993-01-01

    During the Fall of 1992 a comprehensive survey was conducted on eight buildings at the State Capitol Complex to determine potential operations and maintenance (O&M) savings opportunities. A verbal report of the findings was presented to General...

  4. The impact of software design structure on product maintenance costs and measurement of economic benefits of product redesign

    E-Print Network [OSTI]

    Akaikine, Andrei

    2010-01-01

    This paper reports results of an empirical study that aimed to demonstrate the link between software product design structure and engineers' effort to perform a code modification in the context of a corrective maintenance ...

  5. The estimated costs of corn, corn silage, soybeans, al-falfa, and pasture maintenance in this report are based

    E-Print Network [OSTI]

    Duffy, Michael D.

    The estimated costs of corn, corn silage, soybeans, al- falfa, and pasture maintenance record summaries, production and costs data from the Departments of Economics, Agricultural cooperatives and other input suppliers around the state. These costs estimates are representative of average

  6. Track maintenance scheduling and its interactions with operations: Dedicated and mixed high-speed rail (HSR) scenarios

    E-Print Network [OSTI]

    Sussman, Joseph M.

    HSRs are a complex system not only in terms of technical specifications, but also with respect to operations and maintenance over the track structure. Also, track structure is basically considered as the most important and ...

  7. Backup power working group best practices handbook for maintenance and operation of engine generators, Volume 1. Revision 1

    SciTech Connect (OSTI)

    Gross, R.; Padgett, A.B.; Burrows, K.P.; Fairchild, P.N.; Lam, T.; Janes, J.

    1997-06-01

    This handbook is divided into the four chapters. Chapter one covers the design, procurement, storage, handling and testing of diesel fuel oil to be used in DOE backup power supplies. Chapter two discusses the selection of automatic transfer switches to be used in DOE backup power supplies. Chapter three is about low voltage open frame air circuit breaker operation, testing, and maintenance for DOE backup power supplies. And chapter four covers installation, design, and maintenance of engine cooling water and jacket water systems.

  8. New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York)

    Broader source: Energy.gov [DOE]

    Any proposed construction of electricity-related facilities in residential subdivisions, including distribution and service lines and appurtenant facilities, is subject to these regulations, which...

  9. O.A.R. 734-055 - Pole Lines, Buried Cables, Pipe lines, Signs...

    Open Energy Info (EERE)

    and Operations (1981). Retrieved from "http:en.openei.orgwindex.php?titleO.A.R.734-055-PoleLines,BuriedCables,Pipelines,Signs,Misc.FacilitiesandOperations...

  10. Utilization of endless coiled tubing and nitrogen gas in geothermal well system maintenance

    SciTech Connect (OSTI)

    McReynolds, A.S.; Maxson, H.L.

    1980-09-01

    The use of endless coiled tubing and nitrogen gas combine to offer efficient means of initiating and maintaining geothermal and reinjection well productivity. Routine applications include initial flashing of wells in addition to the surging of the formation by essentially the same means to increase production rates. Various tools can be attached to the tubing for downhole measurement purposes whereby the effectiveness of the tools is enhanced by this method of introduction to the well bore. Remedial work such as scale and fill removal can also be accomplished in an efficient manner by using the tubing as a work string and injecting various chemicals in conjunction with specialized tools to remedy downhole problems.

  11. Glosten Associates Tests Innovative High-Strength Mooring Lines...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Glosten Associates Tests Innovative High-Strength Mooring Lines for Deepwater Offshore Wind Installations Glosten Associates Tests Innovative High-Strength Mooring Lines for...

  12. Insulate Steam Distribution and Condensate Return Lines, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Insulate Steam Distribution and Condensate Return Lines Uninsulated steam distribution and condensate return lines are a constant source of wasted energy. The table shows typical...

  13. Development of aerogel-lined targets for inertial confinement...

    Office of Scientific and Technical Information (OSTI)

    ThesisDissertation: Development of aerogel-lined targets for inertial confinement fusion experiments Citation Details In-Document Search Title: Development of aerogel-lined...

  14. Load-resistant coaxial transmission line

    DOE Patents [OSTI]

    Hall, David R.; Fox, Joe

    2006-01-03

    A transmission line for downhole tools that make up all or part of a tool string for drilling and production of oil, gas, and geothermal wells that can withstand the dynamic gravitational forces and other accelerations associated with downhole excavations. The transmission line has a metal tube, or outer conductor, that houses a coaxial wire inner conductor. A non-metallic dielectric material is interposed between the inner and outer conductors. The outer and inner conductors and the dielectric are sufficiently compressed together so that independent motion between them is abated. Compression of the components of the transmission line may be achieved by drawing the transmission through one or more dies in order to draw down the outer conductor onto the dielectric, or by expanding the inner conductor against the dielectric using a mandrel or hydraulic pressure. Non-metallic bead segments may be used in aid of the compression necessary to resist the dynamic forces and accelerations of drilling.

  15. Dynamic Line Rating: Research and Policy Evaluation

    SciTech Connect (OSTI)

    Jake P. Gentle; Kurt S. Myers; Michael R. West

    2014-07-01

    Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of electrical conductors to be increased based on local weather conditions. Overhead lines are conventionally given a conservative rating based on worst case scenarios. We demonstrate that observing the conditions in real time leads to additional capacity and safer operation. This paper provides a report of a pioneering scheme in the United States of America in which DLR has been applied. Thereby, we demonstrate that observing the local weather conditions in real time leads to additional capacity and safer operation. Secondly, we discuss limitations involved. In doing so, we arrive at novel insights which will inform and improve future DLR projects. Third, we provide a policy background and discussion to clarify the technology’s potential and identifies barriers to the imminent adoption of dynamic line rating systems. We provide suggestions for regulatory bodies about possible improvements in policy to encourage adoption of this beneficial technology.

  16. Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

    SciTech Connect (OSTI)

    Wick, Mike

    2008-12-30

    Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

  17. Challenges to Overcurrent Protection Devices under Line-line Faults in Solar Photovoltaic Arrays

    E-Print Network [OSTI]

    Lehman, Brad

    Challenges to Overcurrent Protection Devices under Line-line Faults in Solar Photovoltaic Arrays Ye-MA, LLC Newburyport, MA, US Abstract--Solar photovoltaic (PV) arrays behave distinctively from remain undetected, which could lead to reduced system efficiency, reduced system reliability, and even

  18. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S

    2012-04-01

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  19. Boron-10 Lined Proportional Counter Wall Effects

    SciTech Connect (OSTI)

    Siciliano, Edward R.; Kouzes, Richard T.

    2012-05-01

    The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project 'Coincidence Counting With Boron-Based Alternative Neutron Detection Technology' at Pacific Northwest National Laboratory (PNNL) for development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube based system in the configuration of a coincidence counter. This report provides information about how variations in proportional counter radius and gas pressure in a typical coincident counter design might affect the observed signal from boron-lined tubes. A discussion comparing tubes to parallel plate counters is also included.

  20. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.