Powered by Deep Web Technologies
Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Management of Riparian Areas on Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) commonly cross streams, rivers, ponds, and lakes. Plant communities along the edges of these water resources are important because of their role in soil conservation and habitat diversity as well as the influence they have on fauna and aquatic ecosystems. The area of vegetation affected by the water-based habitatand that in turn affects the wateris the riparian area. This report provides guidance on the definition and management considerations for riparian ...

2011-12-14T23:59:59.000Z

2

Storm Water Best Management Practices Manual for Transmission Line Rights-of-Way Construction and Maintenance  

Science Conference Proceedings (OSTI)

The U.S. Environmental Protection Agency (EPA) has proposed a general construction storm water permit that would require implementation of best management practices (BMPs) to meet a specific nephelometric turbidity unit (NTU) and total suspended solids (TSS) limit as well as additional erosion and sediment control requirements from construction sites. These new requirements will provide unique challenges for those designing, constructing, and maintaining transmission line rights-of-way (ROWs). This techn...

2011-12-30T23:59:59.000Z

3

Survey of Electric and Gas Rights-of-Way Practitioners: Current Practices and Views of Future Transmission Line Siting Issues  

Science Conference Proceedings (OSTI)

The adequacy of the nation's power grid is a topic of great concern, particularly the extent of new construction and upgrades required over the next decade to meet increasing energy demand. This report compiles the survey responses of energy company professionals associated with the task of developing rights-of-way. Respondents provided information on current industry practices, as well as the social and regulatory environment in which they operate to secure rights-of-way for new transmission lines and u...

2003-12-04T23:59:59.000Z

4

Transmission Right Of Way  

NLE Websites -- All DOE Office Websites (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

5

EA-1629: Herbicide Application within Transmission Line Rights-of-Way in the Ozark-St. Francis National Forest, Arkansas  

Energy.gov (U.S. Department of Energy (DOE))

The Department of the Interior, U.S. Forest Service, with DOE’s Southwestern Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of applying herbicide within transmission line rights-of-way in the Ozark-St. Francis National Forest in Arkansas. NOTE: SWPA's involvement in this EA has ended.

6

Importance, Identification, and Assessment of Danger and Hazard Trees Located Outside Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) commonly pass through forested areas across North America. Trees from these forests could fall from outside the ROW into a transmission line and its security zone, potentially causing an outage. Most of the bulk transmission outages across the United States over the past decade have been caused by off-ROW trees. The North American Electric Reliability Corporation (NERC) developed standards for transmission vegetation management programs that strictly regul...

2010-11-22T23:59:59.000Z

7

Electric Transmission Line Right-of-Way Post-Blackout Vegetation Management Strategies: 2008 Update  

Science Conference Proceedings (OSTI)

The role of the federal government in regulating vegetation management on power line corridors changed significantly after the August 2003 blackout that affected more than 50 million people in the eastern United States and Canada. In 2004, the Federal Energy Regulatory Commission (FERC) released a series of reports on vegetation management associated with the blackout, with a respondent sequence of draft standards for vegetation management released from 2005-2006. These standards are being promulgated an...

2008-12-08T23:59:59.000Z

8

Cost Effectiveness of Cleaning Techniques for Controlling Human-based Transport of Invasive Exotic Plants on Electric Transmission Line Rights-of-Way  

Science Conference Proceedings (OSTI)

This Technical Update provides a broad overview of accomplishments over the first full year of the Electric Power Research Institute (EPRI) project to investigate the cost effectiveness of cleaning techniques to control human-based transport of invasive exotic plants on electric transmission line rights-of-way. One-half of the intended field work for the whole project (2012-2015) was completed, with attendant greenhouse and office work ongoing. EPRI expects the project to be completed in ...

2013-11-21T23:59:59.000Z

9

Engineering the Multiple Use of the Right of Way  

Science Conference Proceedings (OSTI)

Transmission line owners and operators are under increasing pressure to share the use of their rights-of-way with other systems and for other activities. The objective of the "Engineering the Multiple Use of the Right of Way" project is to develop a guide for the design and maintenance of transmission lines so that the systems can operate reliably and activities can be carried out safety on these shared rights-of-way. It is a multi-year project conducted from 2004 to 2007. The first task of the project ...

2006-11-13T23:59:59.000Z

10

Power Line-Induced AC Potential on Natural Gas Pipelines for Complex Rights-of-Way Configurations, Volume 1: Engineering Analysis  

Science Conference Proceedings (OSTI)

This report addresses complex common corridor coupling problems for overhead electric power transmission lines and buried natural gas pipelines. Volume 1 describes the development of analytic methods for solving such problems and presents field data used in verification efforts. Volume 2 is a handbook for graphic analysis designed for use by field personnel or others without access to a computer. Volume 3 is a user's guide for the PIPELINE computer code.

1983-05-01T23:59:59.000Z

11

Transmission Rights-of-Way Vegetation Management Plan Framework  

Science Conference Proceedings (OSTI)

The North American Electric Reliability Corporation (NERC) FAC-003-1 standards for vegetation management on electric transmission line rights-of-way (ROWs) have been in place since April 2006. These mandatory standards regulate electric transmission line vegetation management across the United States, and are narrowly focused on minimizing vegetation caused outages in electricity transmission. The NERC FAC-003-1 standards are potentially broadened by the voluntary American National Standards Institute (A...

2008-08-05T23:59:59.000Z

12

Gas Companies Right-of-Way (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Gas Companies Right-of-Way (Maryland) Gas Companies Right-of-Way (Maryland) Eligibility Commercial Industrial Utility Program Information Maryland Program Type Siting and...

13

Application & Checklist for Highway Right of Way Lease | Open...  

Open Energy Info (EERE)

& Checklist for Highway Right of Way Lease Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Application and Checklist for Highway Right of Way Lease...

14

EA-1697: San Joaquin Valley Right-of-Way Project, California | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97: San Joaquin Valley Right-of-Way Project, California 97: San Joaquin Valley Right-of-Way Project, California EA-1697: San Joaquin Valley Right-of-Way Project, California Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of right-of-way maintenance (including facility inspection and repair, vegetation management, and equipment upgrades for transmission lines and associated rights-or-way, access roads, substations, and a maintenance facility) in the San Joaquin Valley in California. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download December 2, 2011 EA-1697: Finding of No Significant Impact Right-of-Way Maintenance in the San Joaquin Valley, California December 2, 2011 EA-1697: Final Environmental Assessment

15

Transmission Right-of-Way Steward Accreditation Pilot Audit Report: Arizona Public Service  

Science Conference Proceedings (OSTI)

This report presents the findings of an independent audit conducted by specialists representing the Right-of-Way (ROW) Steward Program. The purpose of the audit was to evaluate the environmental, economic, and social aspects—the sustainability—of Arizona Public Service’s (APS’s) electric transmission line right-of-way vegetation management and to determine gaps in its sustainable conduct of integrated vegetation management.Integrated vegetation management, or IVM, ...

2013-10-29T23:59:59.000Z

16

Guidelines for Leasing State Highway Right of Way Tracts | Open...  

Open Energy Info (EERE)

Search Page Edit with form History Facebook icon Twitter icon Guidelines for Leasing State Highway Right of Way Tracts Jump to: navigation, search GEOTHERMAL ENERGYGeothermal...

17

Waiver of Preferential Right to Lease Highway Right of Way |...  

Open Energy Info (EERE)

Waiver of Preferential Right to Lease Highway Right of Way Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Reference Material: Waiver of Preferential Right to Lease...

18

Right-of-Way for Carrier Facilities (South Dakota)  

Energy.gov (U.S. Department of Energy (DOE))

This legislation establishes right-of-way for carrier pipelines, as well as restrictions on the width of lands used for pipeline facilities. This legislation also applies to electricity...

19

Power Districts: Acquisition of Right-of-Way (Nebraska) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Districts: Acquisition of Right-of-Way (Nebraska) Districts: Acquisition of Right-of-Way (Nebraska) Power Districts: Acquisition of Right-of-Way (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Line Extension Analysis Provider Nebraska Public Power District This statute describes procedures for power districts (utilities,

20

Rights-of-Way Stability: A 15-year Appraisal of Plant Dynamics on Electric Power Rights-of-Way in New York State  

Science Conference Proceedings (OSTI)

Operational, selective removal of trees on rights-of-way (ROWs) can create relatively stable, compositionally constant low-density tree populations. This report presents the results of studies on 21 electric transmission line ROWs in New York State. The results show that selective vegetation management of undesirable species, an ecologically based management technique, helps promote or maintain plant species richness and diversity on upland landscapes, but appears to have no effect in wetlands. In additi...

1999-09-16T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Corridors and Connectivity of Rights-of-Way: State of the Science  

Science Conference Proceedings (OSTI)

This report considers the topic of invasive species as it relates to power line and other rights-of-way. It presents a synopsis of the current state of the science, which is drawn from a review of the published, peer-reviewed scientific research on the subject. Information is supplemented with commentary from scientists, policymakers, and utility experts.

2008-08-14T23:59:59.000Z

22

Guide to Engineering the Multiple Use of the Right of Way  

Science Conference Proceedings (OSTI)

Transmission line owners are under increasing pressure to allow other systems, structures, and activities to share the right of way. Other systems include distribution lines, railroads, pipelines, fiber optic repeaters, cell phone repeaters, and communication systems. Structures include permanent and temporary buildings and fixtures, parking lots, tennis courts, baseball diamonds, and driving ranges. Activities include recreational, commercial, and farming operations. The effect of the transmission lines...

2007-11-05T23:59:59.000Z

23

Electric Transmission Rights-of-Way Uses and Risks  

Science Conference Proceedings (OSTI)

Significant societal and economic benefits accrue through multiple uses of electric transmission rights-of-way (ROWs). Authorization of multiple ROW uses, however, has the potential to be detrimental to the safe, reliable transmission of electricity. Understanding benefits and risks will help utilities evaluate the myriad of current and potential ROW uses, establish effective protocols, and identify the best opportunities for expanding ROW uses.

2004-12-15T23:59:59.000Z

24

Right-of-Way Treatment Cycles: Update 2000  

Science Conference Proceedings (OSTI)

The selection of right-of-way (ROW) vegetation treatment methods can greatly impact utility profits from distribution and transmission of electricity in a deregulated marketplace. This report evaluates the cost-effectiveness of seven vegetation management methods -- hand cutting, mowing, cut and stump, dormant basal, summer basal, selective ground foliar, and aerial -- on 18 transmission powerline corridors across New York State. The third part of a six-year study, this report summarizes data collected i...

2000-10-25T23:59:59.000Z

25

Long-Term Right-of-Way Effectiveness: Update 2000  

Science Conference Proceedings (OSTI)

In very fundamental ways, utility profits from distribution and transmission of electricity in a deregulated marketplace are linked to their right-of-way (ROW) management approaches. This report evaluates the cost-effectiveness of seven vegetation management methods -- hand cutting, mowing, cut and stump, dormant basal, summer basal, selective ground foliar, and aerial -- on 18 transmission powerline corridors across New York State. The second part of a six-year study, this report evaluates the treatment...

2000-10-25T23:59:59.000Z

26

Conservation and Wetland Banking Opportunities Within Transmission Rights-of-Way.  

Science Conference Proceedings (OSTI)

Electric transmission line rights-of-way (ROWs) encompass millions of acres. Some of these lands include aquatic resources and land suitable for threatened or endangered species habitat. Wetland mitigation banking and habitat conservation banking provide legally recognized ways to offset permitted impacts to aquatic resources and wildlife by providing compensatory mitigation "credits" generated by conservation activities. Because ROW corridor lands traverse a variety of aquatic resources and habitats, an...

2008-12-18T23:59:59.000Z

27

Cost Comparison of Rights-of-Way Treatment Methods: Update 2000  

Science Conference Proceedings (OSTI)

For many utilities in a deregulated marketplace, distribution and transmission of electricity has become their core business. This shift has dramatically increased interest in the siting and right-of-way (ROW) management of electric transmission lines. This report evaluates the cost-effectiveness of seven vegetation management methods -- hand cutting, mowing, cut and stump, dormant basal, summer basal, selective ground foliar, and aerial -- on 18 transmission powerline corridors across New York State.

2000-09-21T23:59:59.000Z

28

Electric Transmission Right-of-Way Invasive Non-Native Woody Plant Species Control  

Science Conference Proceedings (OSTI)

Invasive non-native woody plant species are a significant issue in the United States. Invasive woody plants are a particular concern for electric transmission right-of-way (ROW) managers. While invasive non-native woody plants have beneficial usesincluding erosion control, wildlife food and cover, and use as ornamentalsthey also have a notably negative impact on electric transmission ROWs. Negative impacts include reducing line clearance, reliability, and accessibility, and increasing vegetation manageme...

2006-03-27T23:59:59.000Z

29

New Applications of Transformerless Voltage Sourced Converters (VSC): Phase Displacement for Upgrading Rights-of-Way  

Science Conference Proceedings (OSTI)

New overhead transmission lines, steady expansion of electric power systems, and reallocation of generation all make it increasingly important to maximize the use of existing rights-of-way (ROWs) in order to increase power transfer capability. It is extremely difficult and costly, however, to remove critical circuits from service long enough to reconductor or replace old circuits with new higher capacity circuits using the same ROW. This report describes new means to allow either type of upgrade ...

2013-06-28T23:59:59.000Z

30

GRR/Section 3-WA-e - State Right of Way Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-e - State Right of Way Process GRR/Section 3-WA-e - State Right of Way Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-e - State Right of Way Process 3-WA-e - State Right of Way Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies RCW 79-36-350 RCW 79-36-520 RCW 79-36-530 Triggers None specified This flowchart illustrates the process for obtaining a right of way over state lands in Washington. The right of way process is overseen by the Washington State Department of Natural Resources (WSDNR). The right of way process is regulated under Revised Code of Washington (RCW) 79-36-350. The developer may apply for an easement, permit or license for a right of

31

Definition: Right-Of-Way (Row) | Open Energy Information  

Open Energy Info (EERE)

or license rights to construct and maintain lines.1 Related Terms Transmission Owner, transmission lines, transmission line References Glossary of Terms Used in Reliability...

32

Cost-effectiveness of Different Herbicide and Non-herbicide Alternatives for Treating Transmission Rights of Way Vegetation  

Science Conference Proceedings (OSTI)

This report is a guide to using cost-effectiveness analysis to compare different programs of vegetation management for electric transmission line rights of way.BackgroundCost effectiveness is an important economic measure for describing and comparing the relative acceptability of different vegetation management programs. Cost-effectiveness analysis is apparently rarely used in the utility industry. This might be related to its apparent complexity, but it can ...

2012-12-12T23:59:59.000Z

33

Report to Congress: Corridors and Rights-of-Way on Federal Lands...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corridors and Rights-of-Way on Federal Lands Authority to grant, issue, or renew electric transmission ROWs on Federal land is held by the Forest Service (FS) of the U.S....

34

GRR/Section 3-AK-b - Right of Ways (ROWs) | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-AK-b - Right of Ways (ROWs) GRR/Section 3-AK-b - Right of Ways (ROWs) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-AK-b - Right of Ways (ROWs) 03AKBRightOfWaysROWs.pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Alaska Division of Mining Land and Water Regulations & Policies Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 03AKBRightOfWaysROWs.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Alaska Division of Mining Land and Water (ML&W) oversees land use within the state and issues right of ways, easements or permit to use state

35

Rights-Of-Way (ROW) Environmental Management: New ROW Development and Existing ROW Maintenance  

Science Conference Proceedings (OSTI)

During October 27-29, 1997, the Electric Power Research Institute (EPRI) and the Empire State Electric Energy Research Corporation (ESEERCO) sponsored a workshop to assess the need for a program of environmental research on Rights-of-Way (ROW) development and management, and to develop a research agenda. The workshop built on 1993 and 1996 EPRI meetings, and on the 6th International Symposium on Environmental Concerns in Rights-of-Way Management held in February, 1997. This document presents the proceedi...

1999-12-15T23:59:59.000Z

36

GRR/Section 3-FD-c - Right-of-Way Access | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-FD-c - Right-of-Way Access GRR/Section 3-FD-c - Right-of-Way Access < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-FD-c - Right-of-Way Access 03FDCRightOfWayROWAccess (2).pdf Click to View Fullscreen Contact Agencies Bureau of Land Management United States Forest Service United States Department of Transportation National Telecommunications and Information Administration Regulations & Policies NEPA Triggers None specified Click "Edit With Form" above to add content 03FDCRightOfWayROWAccess (2).pdf 03FDCRightOfWayROWAccess (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flow chart is intended to apply to lands on which a lease has not been

37

GRR/Section 3-TX-c - Highway Right of Way Lease | Open Energy Information  

Open Energy Info (EERE)

3-TX-c - Highway Right of Way Lease 3-TX-c - Highway Right of Way Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-TX-c - Highway Right of Way Lease 03TXCEncroachmentIssues.pdf Click to View Fullscreen Contact Agencies Texas General Land Office Texas Department of Transportation Regulations & Policies 43 TAC 21.600 43 TAC 21.603 43 TAC 21.606 Triggers None specified Click "Edit With Form" above to add content 03TXCEncroachmentIssues.pdf 03TXCEncroachmentIssues.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the procedure for obtaining a state highway asset lease in Texas. The Texas Department of Transportation (TxDOT) may lease any highway asset.

38

GRR/Section 3-MT-f - Right-of-Way Easement for Utilities | Open Energy  

Open Energy Info (EERE)

3-MT-f - Right-of-Way Easement for Utilities 3-MT-f - Right-of-Way Easement for Utilities < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-f - Right-of-Way Easement for Utilities 03MTFRightOfWayEasementForUtilitiesProcess.pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Montana State Historic Preservation Office Triggers None specified Click "Edit With Form" above to add content 03MTFRightOfWayEasementForUtilitiesProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart is intended to describe the process for obtaining an

39

ROW 2.0 - Right-of-Way Environmental Stewardship Bibliographic Database, Version 2.0  

Science Conference Proceedings (OSTI)

The Right-of-Way Environmental Stewardship Bibliographic Database Version 2.0 (ROW 2.0) allows users to search in multiple ways for citations and retrieve summaries of published documents that focus on environmental concerns related to utility corridor design, siting, construction, or management.

2007-03-08T23:59:59.000Z

40

Human Health Risk Assessment of Chemicals Encountered in Vegetation Management on Electric Utility Rights-of-Way  

Science Conference Proceedings (OSTI)

This report discusses the human health risk assessment of chemicals encountered in vegetation management on electric utility rights-of-way (ROWs).

2003-12-03T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Wetland and Conservation Banking in Transmission Corridor Rights-of-Way: Feasibility Assessment  

Science Conference Proceedings (OSTI)

Electric power transmission corridor rights-of-way (ROWs) offer potential locations for wetland mitigation banks and conservation banks. Barriers to use of these ROWs for banking include whether the ROW operator has legal rights of access to lands for these uses and for long term management for conservation; the need to assure successful and reliable operation and maintenance of the ROW transmission facilities; the costs of establishing, permitting and managing wetland and conservation banks; and ecologi...

2008-12-10T23:59:59.000Z

42

Vegetation Management in Electric Transmission Rights-of-Way and Potential Impacts on Groundwater  

Science Conference Proceedings (OSTI)

Chemical contamination of ground water is a growing utility concern. Pesticides and other potentially hazardous chemicals are used ubiquitously in everyday life. Pesticide use is widespread in urban, industrial, and agricultural settings, and in the case of utility rights-of-way (ROWs), is applied in a linear fashion across the landscape, often over long distances and intermingled with other uses. Thus, reliable assessment of risks arising from pesticide contamination of ground water and design of effici...

2010-11-30T23:59:59.000Z

43

Tree Growth Regulators for Management of Trees in Electric Utility Rights-of-Way: A Literature and Current Application Status Review  

Science Conference Proceedings (OSTI)

Chemical growth regulators -- initially developed for horticultural and field crops -- provide a promising, cost-effective tool for management of trees under electric transmission and distribution lines in utility rights-of-way (ROWs). Paclobutrazol (commercial product Profile® 2SC) and flurprimidol (commercial product Cutless® tree implants) are potent tree growth regulators for a broad range of herbaceous and woody gymnosperm and angiosperm species. This review summarizes the published literatu...

2000-10-31T23:59:59.000Z

44

Detection of Unauthorized Construction Equipment in Pipeline Right-of-Ways  

Science Conference Proceedings (OSTI)

The leading cause of incidents on transmission pipelines is damage by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline is hit. Currently there is no method for continuously monitoring a pipeline right-of-way. Instead, companies periodically walk or fly over the pipeline to find unauthorized construction activities. Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber buried above the pipeline as a distributed sensor. A custom optical time domain reflectometer (OTDR) is used to interrogate the fiber. Key issues in the development of this technology are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. Advantages of the reflectometry technique are the ability to accurately pinpoint the location of the construction activity and the ability to separately monitor simultaneously occurring events. The basic concept of using OTDR with an optical fiber buried above the pipeline to detect encroachment of construction equipment into the right of way works. Sufficiently rapid time response is possible; permitting discrimination between encroachment types. Additional work is required to improve the system into a practical device.

Maurice Givens; James E. Huebler

2004-09-30T23:59:59.000Z

45

Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study, Report to Congress  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Act of 2005, Section 1813 Policy Act of 2005, Section 1813 Indian Land Rights-of-Way Study Report to Congress May 2007 U.S. Department of Energy U.S. Department of the Interior REPORT TO CONGRESS ENERGY POLICY ACT OF 2005, SECTION 1813 INDIAN LAND RIGHTS-OF-WAY STUDY U.S. Department of Energy U.S. Department of the Interior May 2007 Report to Congress: EPAct 2005, Section 1813, Indian Land Rights-of-Way Study i Contents Notation........................................................................................................................................... v Executive Summary ...................................................................................................................... vii 1. Introduction .............................................................................................................................

46

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

Science Conference Proceedings (OSTI)

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with an custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the third quarter of the project (2nd quarter of 2002) includes design of the diode laser driver and high-speed detector electronics and programming of the custom optical time domain reflectometer.

James E. Huebler

2002-07-19T23:59:59.000Z

47

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

SciTech Connect

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the third quarter of the project (2nd quarter of 2002) includes design and construction of the diode laser driver and high-speed detector electronics. Fine-tuning of the electronics is proceeding. A new test site along an operating pipeline has been obtained.

James E. Huebler

2002-10-30T23:59:59.000Z

48

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

Science Conference Proceedings (OSTI)

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the 1st quarter of 2003 included fine-tuning and debugging of the custom Optical Time Domain Reflectometer being constructed for data collection and analysis. The detector was redesigned reducing the noise floor by over a factor of ten. While GTI's OTDR was being improved, a new, commercial OTDR was used to verify that the technique is capable of measuring one pound continuous force applied to the Hergalite. Optical fibers were installed at the ANR Pipeline test site along an operating pipeline.

James E. Huebler

2003-04-17T23:59:59.000Z

49

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

SciTech Connect

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work continues on improving the signal-to-noise ratio of the technique. We are now able to detect weights sitting on the Hergalite fiber of as low as 0.2 pound. Detection of load fluctuations with frequencies greater than 1 Hertz is also possible. We have also purchased a brighter diode laser for use with the multimode fibers that should improve our sensitivity by a factor of ten.

James E. Huebler

2004-04-12T23:59:59.000Z

50

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

Science Conference Proceedings (OSTI)

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the 4th quarter of 2002 included fine-tuning and debugging of the custom Optical Time Domain Reflectometer being constructed for data collection and analysis. It also included installation of optical fibers at the test site along an operating pipeline.

James E. Huebler

2003-01-29T23:59:59.000Z

51

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

SciTech Connect

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work continues on improving the signal-to-noise ratio of the custom OTDR. An avalanche photo-detector, was purchased. It was able to detect weights on the Hergalite fiber as low as one pound. We are also investigating a brighter laser for use with the multimode fibers.

James E. Huebler

2003-07-17T23:59:59.000Z

52

Ecological and Wildlife Risk Assessment of Chemicals Encountered in Vegetation Management on Electric Utility Rights-of-Way  

Science Conference Proceedings (OSTI)

The management of vegetation on electric utility rights-of-way (ROWs) is an essential part of managing electrical transmission and distribution systems. A variety of manual, mechanical, and chemical methods, singly or in combination, are used for this purpose. The method or methods selected must be safe for humans and the environment and cost-effective in accomplishing the goals of ROW management. This report reviews environmental and wildlife safety through an assessment of risk to the environment, incl...

2004-12-27T23:59:59.000Z

53

Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DRAFT REPORT TO CONGRESS: DRAFT REPORT TO CONGRESS: ENERGY POLICY ACT OF 2005, SECTION 1813, INDIAN LAND RIGHTS-OF-WAY STUDY U.S. Department of Energy U.S. Department of the Interior August 7, 2006 DRAFT August 7, 2006 DRAFT ii Contents 1. Introduction............................................................................................................................. 1 1.1. Statutory Language of Section 1813............................................................................... 1 1.2. Scope of Section 1813 .................................................................................................... 2 1.3. Issues Raised in Scoping the Study ................................................................................ 4 1.3.1. Tribal Sovereignty, Consent, and Self-Determination............................................

54

Electric Transmission Right-of-Way Post-Blackout Vegetation Management Strategies  

Science Conference Proceedings (OSTI)

The blackout on August 14, 2003, was the largest in U.S. history. It started with a line going out in Ohio. It affected eight U.S. states and one Canadian province. It covered more than 9000 sq miles (23,310 sq km). It disrupted over 61,000 MW of power. It caused three deaths. It closed 12 major airports. It touched more than 50 million peopleone-third of the Canadian population and one-seventh of the U.S. population. It cost more than US4 billion in lost economic activity.1 The blackout was caused by ca...

2007-02-01T23:59:59.000Z

55

The role of power line rights-of-way as an alternative habitat for declined mire butterflies  

E-Print Network (OSTI)

of s(t), and each row has 16s+L - 1 states, representing all possible waiting times to transmission the transmission is completed and the node moves at the next time slot to row s - 1(except if s was 1). If we adopt networking standards (e.g.. EEE 802.3 CSMAICD (ethemet) standard [14], IEEE 802.11 wireless LAN standard [15

Kotiaho, Janne S.

56

Vegetation Dynamics Along Utility Rights-of-Way Factors Affecting the Ability of Shrub and Herbaceous Communities to Resist Invasion by Trees  

Science Conference Proceedings (OSTI)

Traditional vegetation management programs along utility rights-of-way (ROW) have been designed to prevent tree growth into transmission wire security zones. This study of vegetation dynamics describes factors affecting the ability of shrub and herbaceous communities to resist tree invasion. Such information will allow ecologists to identify the critical pressure points where intervention in natural ecological processes will prove most effective.

1999-09-11T23:59:59.000Z

57

Development of a right-of-way cost estimation and cost estimate management process framework for highway projects  

E-Print Network (OSTI)

Escalation of right-of-way (ROW) costs have been shown to be a prime contributor to project cost escalation in the highway industry. Two problems contribute to ROW cost escalation: 1) the ROW cost estimation and cost estimate management process generally lacks structure and definition as compared to other areas of cost estimation; and 2) there is a lack of integration and communication between those responsible for ROW cost estimating and those responsible for general project cost estimating. The research for this thesis was preceded by a literature review to establish the basis for the study. Data collection was completed through interviews of seven state highway agencies (SHAs) and two local public agencies (LPAs). The findings of the research are presented in a set of ROW flowcharts which document the steps, inputs, and outputs of the ROW cost estimation and cost estimate management process. Three ROW cost estimates and a cost management process take place throughout project development. An effort was made from the onset of the research to relate the ROW cost estimating and cost estimate management process to the first four project development phases (planning, programming. preliminary design, and final design). There are five flowcharts produced as a result of this research: 1) an agency-level flowchart showing all cost estimates and the interaction of ROW with the project development process; 2) a conceptual ROW cost estimating flowchart which depicts the required steps during planning; 3) a baseline ROW cost estimating flowchart which depicts the required steps during programming; 4) an update ROW cost estimating flowchart which depicts the required steps during preliminary design to include a cost estimate management loop; and 5) a ROW cost management flowchart which depicts the required steps during final design. Although selected SHA contacts provided input following the development of the flowcharts, the flowcharts were only validated to a limited extent due to time and budget constraints. These flowcharts attempt to address the two contributing problems to ROW cost escalation by providing structure to the ROW cost estimation process and by developing the ROW process flowcharts linked to the project development process. Based on the input provided by SHA contacts, the flowcharts appear to have the potential to provide guidance to SHAs in improving the accuracy of ROW cost estimates through addressing these two problems.

Lucas, Matthew Allen

2007-12-01T23:59:59.000Z

58

Cost Effectiveness of Cleaning Techniques for Controlling Human-based Transport of Invasive Exotic Plants on Electric Transmission L ine Rights-of-Way  

Science Conference Proceedings (OSTI)

This report provides a broad overview of accomplishments over the first 3 months of a project to define the cost effectiveness of cleaning techniques on electric transmission rights of way aimed at controlling the spread of invasive exotic (IE) vegetation. It includes the results of a brief literature search of cleaning techniques.BackgroundA science basis for process and procedure to cost effectively clean personnel and equipment so as to reduce the ...

2012-12-08T23:59:59.000Z

59

Utility Lines and Facilities (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations apply to the construction of utility and power lines and facilities. They address the use of public right-of-ways for such construction, underground power lines, and construction...

60

NEPA REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REVIEW REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55 1. DESCRIPTION OF PROPOSED ACTION: LANL proposes to shift a segment of Pajarito Road slightly to the south along the edge of Two-Mile Canyon in the vicinity of TA-55. The existing centerline would be moved between 36 feet and 56 feet depending on final designs. This shift would address the need to integrate security requirements related to the Chemistry and Metallurgy Building Replacement Project (CMRR) and the Nuclear Materials Safeguards and Security Upgrades Project (NMSSIJP) - specifically placement of the Perimeter Intrusion Detection, Assessment, and Delay System fence improvements in proximity to Pajarito Road. Pajarito Road is not open to the public and is secured to preclude unauthorized access to the facilities between

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Power Line-Induced AC Potential on Natural Gas Pipelines for Complex Rights-of-Way Configurations, Volume 4: Field Verification of H orizontal Wire Mitigation Method  

Science Conference Proceedings (OSTI)

Volume 4 of this four-volume report contains details on a new method of mitigating induced voltage on pipelines by coupling them with a conductor buried in parallel. A field demonstration of this mitigation method that took place in California's Mohave Desert is also described.

1984-04-01T23:59:59.000Z

62

Power Line-Induced AC Potential on Natural Gas Pipelines for Complex Rights-of-Way Configurations, Volume 2: Graphic Analysis Handbo ok  

Science Conference Proceedings (OSTI)

Volume 2 is a handbook for graphic analysis designed for use by field personnel or others without access to a computer.

1983-05-01T23:59:59.000Z

63

Mutual Design Considerations for Overhead AC Transmission Lines and Gas Transmission Pipelines, Volume 1: Engineering Analysis  

Science Conference Proceedings (OSTI)

This reference book presents data on an investigation into the mutual effects of electric power transmission lines and natural gas transmission pipelines sharing rights-of-way. Information is useful to both power and pipeline industry users.

1978-09-01T23:59:59.000Z

64

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

65

Nest predation, predator abundance, and avian diversity in transmission line corridors and adjacent habitats in east central Texas.  

E-Print Network (OSTI)

??Transmission line corridors and other types of rights-of-way (ROW) are narrower and more continuous than other types of disturbances and, therefore, result in a proportionately… (more)

Hubbard, Tani Ann

2012-01-01T23:59:59.000Z

66

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO  

Energy.gov (U.S. Department of Energy (DOE))

DOE’s Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support its decision on whether to grant a Special Use Permit for parts of the transmission line located on National Forest lands.

67

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

Electrical effects can constrain the design of prospective high-voltage direct current (HVDC) lines operating either alone or sharing the same rights of way structures with high-voltage alternate current (HVAC) lines. In 2013, the Electric Power Research Institute (EPRI) research on HVDC electrical effects focused on electric field and ion density at ground level. The ultimate goal of the project is to calculate with confidence these electrical effects. The algorithms on which the software currently ...

2013-11-08T23:59:59.000Z

68

CX-009088: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion Determination Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3...

69

Guide for Successful Transmission Line Siting  

Science Conference Proceedings (OSTI)

As described in the Federal Energy Regulatory Commission (FERC) Permit Process, eminent domain proceedings are not the preferred method of obtaining rights-of-way for transmission lines. The permitting process is rather one of engaging the public through meetings and education to develop siting consensus. This approach requires an in-depth understanding of the primary technical issues by everyone involved in the siting procedures. The applicant must demonstrate due diligence in justifying the new ...

2013-12-05T23:59:59.000Z

70

Guide for Successful Transmission Line Siting  

Science Conference Proceedings (OSTI)

As described in the Federal Energy Regulatory Commission (FERC) Permit Process, eminent domain proceedings are not the preferred method of obtaining rights-of-way for transmission lines. The permitting process is rather one of engaging the public through meetings and education to develop siting consensus. This approach requires an in-depth understanding of the primary technical issues by everyone involved in the siting procedures. The applicant must demonstrate due diligence in justifying the new ...

2012-11-19T23:59:59.000Z

71

Guide for Operating Lines at High Temperatures: 2013 Update  

Science Conference Proceedings (OSTI)

Faced with difficulties in acquiring rights-of-way and reduced capital budgets for new transmission lines, many electric energy companies are seeking ways to extract more capacity from existing systems. One option for increasing power flow is to operate overhead transmission lines at higher temperatures than originally designed, an inexpensive option that can be accomplished quickly. It is, however, important that utilities understand the short- and long-term effects of high operating temperatures ...

2013-12-09T23:59:59.000Z

72

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line 9/30/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 30, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. Right of way width is 150 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads

73

Use of Transmission Line Easements for Benefit of Native Bees  

Science Conference Proceedings (OSTI)

The management of vegetation on electric utility rights-of-way (ROWs) is an essential part of managing electrical transmission and distribution systems. This study examines the impact of habitat vegetation management in transmission line easements on native bee communities. The study emphasizes quantitative testing of whether management strategies such as integrated vegetation management, seeding, and plantingall of which differ from the standard mechanical removal of tall vegetation through episodic mow...

2011-12-20T23:59:59.000Z

74

Analysis of magnetic fields produced far from electric power lines  

Science Conference Proceedings (OSTI)

In this paper, the authors develop a simple and general method for analyzing the magnetic fields produced by power lines at far distances, that is, at distances large in comparison to the spacing between the line's phase conductors. Magnetic fields produced far from conventional power lines have remarkably simple properties. The authors present formulae for the fields produced by various conventional and unconventional power line configurations; included are line designs characterized by reduced magnetic-field levels. Errors in the formulae are less than [plus minus]10% at the edge of a typical transmission right-of-way.

Kaune, W.T. (Enertech Consultants Campbell, CA (United States)); Zaffanella, L.E. (High Voltage Transmission Research Center, Lenox, MA (United States))

1992-10-01T23:59:59.000Z

75

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah  

Energy.gov (U.S. Department of Energy (DOE))

This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

76

EPRI AC Transmission Line Reference Book-200kV and Above, 2012 Edition  

Science Conference Proceedings (OSTI)

This version of the Redbook is available in PDF only and contains an updated chapter on Right-of-Way management. An older version (#1011974) is available in hardcopy only. You must download Product #1011973 in order to get the companion applets to the report.In 2012, EPRI has undertaken an effort to update this most recent edition of the longtime industry standard EPRI Transmission Line Reference Book, or the “Red Book,” ...

2012-10-30T23:59:59.000Z

77

EPRI AC Transmission Line Reference Book-200kV and Above, 2013 Edition  

Science Conference Proceedings (OSTI)

In 2012, EPRI started undertaking an effort to update the most recent edition of the longtime industry standard EPRI Transmission Line Reference Book, or the “Red Book,” which was last published in 2005. The 2012 edition included a new and significantly expanded version of Chapter 12, “Shared Use of the Right-of-Way.” Following that initial revised edition, additional updates have been planned, with other chapters being revised and expanded.  In 2013, Chapter 2 ...

2013-12-27T23:59:59.000Z

78

North American Short Line and Regional Railroads Industry Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industry A Profile of the Industry System Size: System Size: 46,474 miles of right of way. This is nearly 13 of 46,474 miles of right of way. This is nearly 13 of the U.S....

79

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

80

EIS-0442: Forest Service Reauthorization of Transmission Lines on Forest Service Lands in Colorado, Utah and Nebraska for Routine Maintenance Practices including Changes in Vegetation Management  

Energy.gov (U.S. Department of Energy (DOE))

Draft Environmental Impact Statement: Comment Period Ends 10/12/13This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

along the existing along the existing Empire-EDS 11S-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Empire-ED5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system.

82

Evolving Rights-of-Way Vegetation Management Standards and Practices: Update 2010  

Science Conference Proceedings (OSTI)

Current regulations are shaping how transmission vegetation management is implemented in North America. Regulations are maturing and fines for violations of the NERC standard FAC-003-1 are becoming larger and more consistently assessed. Transmission vegetation managers must maintain a transmission system with no vegetation caused outages and do so cost effectively in an environmental acceptable manner that meets landowner and public approval.

2010-12-08T23:59:59.000Z

83

CX-007750: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-007750: Categorical Exclusion Determination "Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a multiple use request submitted by the City of Longview, Washington, to construct a paved recreational trail (the Highland Trail) for pedestrian and bicycle use on existing BPA transmission line right-of-way in Longview, Washington. The Highland Trail would be located on existing BPA fee-owned right-of-way property along the BPA Longview-Cowlitz Number 1, 115-kilovolt (kV) transmission line corridor. It would be built within a 70-foot-wide Reserve

84

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

85

CX-006585: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-006585: Categorical Exclusion Determination Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside Trail CX(s) Applied: B4.9 Date: 08/25/2011 Location(s): Beaverton, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by Tualatin Hills Park and Recreation District (THPRD) to construct portions of their proposed regional trail on existing BPA transmission line right-of-way (ROW) in the City of Beaverton, Oregon. THPRD?s trail sections would be located on portions of existing BPA fee-owned right-of-way property along the BPA Keeler-Oregon City No. 2 and Oregon City Stub 115-kilovolt transmission line corridors, as well as adjacent non-BPA

86

CX-007172: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

07172: Categorical Exclusion Determination 07172: Categorical Exclusion Determination CX-007172: Categorical Exclusion Determination Tucson-Apache Erosion Repair & Cactus Relocation CX(s) Applied: B1.3 Date: 02/23/2011 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to construct a new access road along the existing Tucson-Apache 115-kilovolt (kV) transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-25/2 & 25/3- 26/5. We will be installing two gates to limit right-of-way access from Houghton Road. We

87

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

88

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 6, 2012 February 6, 2012 CX-007997: Categorical Exclusion Determination Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration February 2, 2012 CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration February 2, 2012 CX-007998: Categorical Exclusion Determination Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration

89

Coupling of transients in HVDC lines to adjacent HVAC lines and its impact on the AC line protection.  

E-Print Network (OSTI)

??With stringent environmental regulations in the world today, acquisition of new rights-of-way (RoW) for transmission projects by electricity companies is at a premium. Faced with… (more)

Arro, Tõnn

2007-01-01T23:59:59.000Z

90

CX-007997: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-007997: Categorical Exclusion Determination Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s)...

91

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

Science Conference Proceedings (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

92

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 2270 of 26,777 results. 61 - 2270 of 26,777 results. Page Special Topics in NEPA Documentation Selected documents covering Special Topics under NEPA. http://energy.gov/nepa/special-topics-nepa-documentation Download CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007999-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3

93

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 30220 of 31,917 results. 11 - 30220 of 31,917 results. Download CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007991-categorical-exclusion-determination Download CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007999-categorical-exclusion-determination Download CX-008151: Categorical Exclusion Determination

94

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

95

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 1970 of 26,777 results. 61 - 1970 of 26,777 results. Download CX-005422: Categorical Exclusion Determination La Pine Chiloquin and Brasada Harney Number 1 Transmission Line Right-of-Ways CX(s) Applied: B1.3 Date: 03/15/2011 Location(s): Klamath County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005422-categorical-exclusion-determination Download Technical Standards, CFAST-Code Guidance- July 23, 2004 DOE-EH-4.2.1.4-CFAST-Code Guidance, CFAST Computer Code Application Guidance for Documented Safety Analysis http://energy.gov/hss/downloads/technical-standards-cfast-code-guidance-july-23-2004 Download CX-002690: Categorical Exclusion Determination Pajarito Road Right-Of-Way Shift at TA-50 and TA-55 CX(s) Applied: B1.13 Date: 04/21/2010 Location(s): New Mexico

96

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

97

Microsoft Word - CX-NorthBonneville-RossNorthBonneville-Troutdale_LineSwap_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Civil Engineer - TEP-TPP-3 Proposed Action: North Bonneville-Ross #1 230-kV, North Bonneville-Troutdale #2 230-kV transmission line maintenance Budget Information: Work Order #00246927 PP&A Project No.: PP&A 1666 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.13 Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines approximately 20 miles in length or less to enhance environmental and land use values. Such actions include relocations to avoid right-of-way encroachments, resolve conflict with property development, accommodate road/highway construction, allow for the construction of facilities

98

Evaluating the Potential to Develop New Greenhouse Gas Emission Offsets on Electricity Transmission System Rights-of-Way  

Science Conference Proceedings (OSTI)

This report is a final deliverable for a research project conceived and supported by EPRI. This project explored the potential technical feasibility of developing greenhouse gas (GHG) emissions offsets by implementing enhanced Integrated Vegetation Management (IVM) to enhance management of biomass vegetation growing on high-voltage electricity ...

2013-03-30T23:59:59.000Z

99

SUSTAINABILITY: A Central Principle for the Electric Utility Industry Available Through Vegetation Management on Transmission Rights-of-Way  

Science Conference Proceedings (OSTI)

Sustainability is a relatively new principle based on old ideals. Basic precepts of sustainability have guided human activity for as long as there has been society150making sure that what we do today does not negatively affect what people, particularly our children, can do in the future. Over the last 20 years, much has happened that has elevated sustainability as an important consideration for industry and for society. Society's interest in sustainability is causing organizations to use the concept as ...

2009-12-01T23:59:59.000Z

100

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facilty Location Evaluation for Franklin-Badger Canyon 230-kV Line and Badger Canyon Substation Study Area 74-6B.  

SciTech Connect

Proposed is the construction of a 15-mile, 230-kV double-circuit transmission line from Franklin Substation near Pasco, Washington, to a proposed new Badger Canyon Substation to be constructed 5 miles west of Kennewick, Washington. Depending on the final route location chosen, approximately 15 miles of 230-kV double circuit transmission line requiring 5.6 miles of new and 9.4 miles of existing right-of-way would be needed as well as approximately 2500 feet of new access road. Land use affected includes crossing Sacajawea State Park and passig through irrigated cropland and grassland on existing right-of-way, and depending on the alternative route chosen, could cross land proposed for residential development and a proposed interstate highway. An additional 10 to 11 acres of potential cropland would be required for the proposed substation. Disturbance to wildlife during construction would occur and habitat associated with the above land uses would be eliminated. Some erosion and sedimentation would occur. Visual impacts would affect Sacajawea State Park, a proposed highway, and potential residential development land. Noise and other disturbances to residents will occur, primarily during construction.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

102

CX-010110: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10: Categorical Exclusion Determination 10: Categorical Exclusion Determination CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus Montrose (HSP-MTR) 345-kilovolt (kV) transmission line located between Montrose and Norwood, Colorado. CX-010110.pdf More Documents & Publications CX-008790: Categorical Exclusion Determination

103

CX-006296: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6296: Categorical Exclusion Determination 6296: Categorical Exclusion Determination CX-006296: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance and reconstruction activities along existing access roads, both on and off the right-of-way. The work involves approximately 4.7 miles of road reconstruction or improvement work on or leading to the Cardwell-Cowlitz No. 1, 115- kilovolt transmission line right-of-way between Cardwell Substation and structure 7/8. The roadwork is needed to improve access for crews that will be replacing the transmission line support structures within the transmission line corridor.

104

CX-003232: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

32: Categorical Exclusion Determination 32: Categorical Exclusion Determination CX-003232: Categorical Exclusion Determination Ostrander-Troutdale Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/30/2010 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration proposes to rebuild and/or repair an existing access road and right-of-way road that provides access to the Ostrander-Troutdale Number 1 transmission line and right-of-way access for motile sites between mile/structure 10/1 to 17/3 and one site on the Big Eddy-Troutdale 63/1 ? 63/2 line. Ostrander-Troutdale Number 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

105

EIS-0285-SA-35: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line Right of Way and the Mossy Rock-Chehalis Transmission Line Right of Way, between 71 to...

106

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

107

CX-003019: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

019: Categorical Exclusion Determination 019: Categorical Exclusion Determination CX-003019: Categorical Exclusion Determination Sectionalize Spence-Dave-Johnston 230-Kilovolt Line Near Casper CX(s) Applied: B4.13 Date: 05/31/2010 Location(s): Casper, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region The Western Area Power Administration, Loveland, Colorado, is responding to a request by PacifiCorp Energy to reroute a small section of Western's Dave Johnston to Spence transmission line onto 0.8 miles of new right-of-way in the vicinity of PacifiCorp's Casper substation. Western would own the new right-of-way acquired by PacifiCorp. The reroute would accommodate activities that PacifiCorp needs to accomplish at their substation. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003019.pdf

108

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

109

Help Line  

NLE Websites -- All DOE Office Websites (Extended Search)

Help Line Help Line Ombuds Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns and want advice or referral while preserving confidentiality and anonymity. Callers may remain anonymous and the Help Line does not have caller ID or other methods of identifying callers. The Help Line maintains the same level of confidentiality and neutrality as the other Ombuds services. The Ombuds Help Line is not for reporting emergencies or officially

110

Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility  

Science Conference Proceedings (OSTI)

The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction.

Queen, R.L.

1991-06-01T23:59:59.000Z

111

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Brochure Right-of-Way A right-of-way is a safety zone around Southwestern's high voltage transmission lines. This safety zone must be kept free of trees, buildings, fences, roads,...

112

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

113

CX-003610: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

610: Categorical Exclusion Determination 610: Categorical Exclusion Determination CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to re-construct an existing access road along the Ross-Lexington Number 1 transmission line right-of-way (ROW) located in Cowlitz County, Washington. During the winter of 2008-09 a portion of the access road washed out during heavy rain, making passage impossible. The remaining portions of the road are heavily damaged and in dire need of repair. The proposed action will allow safe and timely access to the right of way which will help reduce outage times and

114

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 19, 2011 September 19, 2011 CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration September 16, 2011 CX-006820: Categorical Exclusion Determination Prosser Hatchery Storage Shed CX(s) Applied: B1.15 Date: 09/16/2011 Location(s): Prosser, Benton County, Washington Office(s): Bonneville Power Administration, Natural Gas Regulation September 16, 2011 CX-006819: Categorical Exclusion Determination Replace Aging Wood Poles on Trans Alta?s Centralia Tap to Chehalis-Covington No. 1 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/16/2011 Location(s): Lewis County, Washington

115

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

1992-04-01T23:59:59.000Z

116

CX-008680: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-008680: Categorical Exclusion Determination Schultz-Raver No.1 Right-Of-Way Marking Project CX(s) Applied: B1.3 Date: 07192012 Location(s): Washington...

117

CX-009408: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way CX(s) Applied: B1.3 Date: 05222012 Location(s): Colorado, Colorado,...

118

Proposed Norton-Tesuque 115 kV overhead transmission line and substation in Sante Fe, New Mexico  

SciTech Connect

Construction is proposed of a 115/12.5-kilovolt (kV), 10/12.5-megavolt-ampere (MVA) substation in the Tesuque area and of 9.02 miles of 115-kV overhead transmission line from the Norton Station to the new substation in an area approximately three miles north of Sante Fe, New Mexico. The project would involve the granting of a 100-foot width right-of-way by the Tesuque Pueblo, the construction of the substation on the Tesuque Pueblo Indian Reservation between the Rio Tesuque and New Mexico 85, the addition of a 115-kV breaker bay at Norton Station, and the installation of two underground 12.47-kV distribution feeders to connect to existing ones in the Tesuque area. In addition, the station would be designed to accommodate one future underground 12.47-kV feeder that would terminate at a future distribution line in the Tesuque area. The preferred transmission line route would originate at the Norton Station and proceed east-northeast up Calabasa Arroyo to a point approximately 1.1 miles north of the southwest corner of the Tesuque Pueblo boundary. From this point the route would proceed east to the proposed substation site.

1985-06-01T23:59:59.000Z

119

ES-1 SEP Environmental Questionnaire  

NLE Websites -- All DOE Office Websites (Extended Search)

location, impacts, costs. No Yes (describe) c. Would any new transmission lines, pipelines or power line or other right-of-ways be required? No Yes (Describe...

120

BEAM LINE  

NLE Websites -- All DOE Office Websites (Extended Search)

BEAM LINE BEAM LINE 45 W ILHELM ROENTGEN'S INITIAL DISCOVERY of X-radiation in 1895 led immediately to practical applications in medicine. Over the next few decades X rays proved to be an invaluable tool for the investigation of the micro-world of the atom and the development of the quantum theory of matter. Almost a century later, telescopes designed to detect X-radiation are indispensable for understanding the structure and evolution of the macro-world of stars, galaxies, and the Universe as a whole. The X-Ray Universe by WALLACE H. TUCKER X-ray images of the Universe are strikingly different from the usual visible-light images. 46 SUMMER 1995 did not think: I investigated." Undeterred by NASA's rejection of a proposal to search for cosmic X-radiation, Giacconi persuaded the

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

122

Soil Compaction: A Comprehensive Literature Review: State-of-the-Art Review and Bibliography With Interpretations for Transmission Rights-of-Way  

Science Conference Proceedings (OSTI)

The second in a series of related reports, this study identifies causes and effects of soil compaction and remedial techniques to alleviate those effects.

1999-09-16T23:59:59.000Z

123

Nano-Interchange vs. the All-Directional Four-Level: A Comparison of Geometrics, Construction Costs, and Right of Way Requirements.  

E-Print Network (OSTI)

??This thesis introduces the nano-interchange, an innovative concept in freeway-to-freeway interchange design, originating with Dr. Joseph Hummer, P.E., of North Carolina State University. Created with… (more)

Harris, Meredith Louise

2007-01-01T23:59:59.000Z

124

Destin Dome 56 Unit development and production plan and right-of-way pipeline application: Draft environmental impact statement. Volume 1: Sections 1--10  

SciTech Connect

The MMS prepared this environmental impact statement (EIS) on Chevron`s plan to drill 20 new wells within the Destin Dome (DD) 56 Unit, to produce up to 450 trillion cubic feet of natural gas per day, and to transport the gas through pipelines to processing plants in Alabama. Volume 1---Section 1 states the reasons for the proposed development of the DD 56 Unit and describes the plan and pipeline in detail. Section 2 describes the proposal, the alternatives, and the mitigation measures. Section 3 describes the physical, biological, and social resources within the DD 56 Unit and in areas from Pascadoula, Mississippi, to Cape San Blas, Florida, that might be affected if Chevron is allowed to go ahead with the plan. This descriptive background information gives the status of these reasons as they are now. Section 4 analyzes the environmental effects that could be anticipated from Chevron`s plan, and a separate analysis of possible and expected effects is done for the resources described in Section 3. Section 5 discusses how the Draft EIS was developed and distributed. Section 6 lists the references cited in the main text. Section 7 lists the people who wrote and worked on the EIS. Section 8 is a glossary of terms used. Section 9 (Appendices) contains technical information, including descriptions of the geology and physical oceanography of the DD 56 Unit.

NONE

1999-08-20T23:59:59.000Z

125

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 27540 of 28,904 results. 31 - 27540 of 28,904 results. Download CX-009088: Categorical Exclusion Determination Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3 Date: 08/07/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-009088-categorical-exclusion-determination Download CX-009093: Categorical Exclusion Determination Knolls Laboratory Q14 Sprinkler System Upgrade Project CX(s) Applied: B1.15, B2.2 Date: 08/03/2012 Location(s): New York Offices(s): Naval Nuclear Propulsion Program http://energy.gov/nepa/downloads/cx-009093-categorical-exclusion-determination Download CX-009101: Categorical Exclusion Determination Monosodium Titanate (MST) Rheology

126

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

031 - 2040 of 9,640 results. 031 - 2040 of 9,640 results. Download CX-005422: Categorical Exclusion Determination La Pine Chiloquin and Brasada Harney Number 1 Transmission Line Right-of-Ways CX(s) Applied: B1.3 Date: 03/15/2011 Location(s): Klamath County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005422-categorical-exclusion-determination Download CX-005965: Categorical Exclusion Determination Alvey District Wood Poles: Eugene-Lane Number 1, Eugene-Alvey Number 2, and Hawkins-Alvey Number 1 CX(s) Applied: B1.3 Date: 05/20/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005965-categorical-exclusion-determination Download CX-002273: Categorical Exclusion Determination Building 961 Refurbishments (Tech Area IV)

127

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 24540 of 31,917 results. 31 - 24540 of 31,917 results. Download CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-006818-categorical-exclusion-determination Download CX-005409: Categorical Exclusion Determination Olympia-Grand Coulee Number 1 Transmission Line CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005409-categorical-exclusion-determination Download CX-001411: Categorical Exclusion Determination Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project

128

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 11350 of 28,905 results. 41 - 11350 of 28,905 results. Download CX-005422: Categorical Exclusion Determination La Pine Chiloquin and Brasada Harney Number 1 Transmission Line Right-of-Ways CX(s) Applied: B1.3 Date: 03/15/2011 Location(s): Klamath County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005422-categorical-exclusion-determination Download CX-005847: Categorical Exclusion Determination Rocky Reach - Maple Valley Access Road Repair CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): King County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005847-categorical-exclusion-determination Download Audit Report: OAS-L-03-19 Audit of Recurring Acquisitions at the Chicago Operations Office http://energy.gov/ig/downloads/audit-report-oas-l-03-19

129

Magnetic field exposure assessment for adult residents of Maine who live near and far away from overhead transmission lines  

Science Conference Proceedings (OSTI)

Sixty-Hz magnetic field exposures were measured for 45 adult residents of Maine. Thirty of the subjects resided near rights-of-way (ROWs) with either 345- and 115-kV transmission lines, or ROWs with only 115-kV transmission lines; fifteen resided far from any transmission lines. Personal exposure data for a single 24-hour period was acquired with the EMDEX. The EMDEX's event-marker button was used to partition exposures into Home and Away components. Also, three area measurements were taken for each subject during the personal exposure measurement period: (1) 24-hr fixed-site bedroom measurement with a second EMDEX; (2) Spot measurements in at least three rooms of every residence; and (3) Spot measurements outside each residence. Residence near transmission lines highly loaded during the measurement period was associated with increased Home and Total exposure relative to a far-away population. Average exposure level while away from home was uniform (at about 2 mG) throughout the study population. On a quantitative level, Home exposure was correlated equivalently with Spot-In (r = .70) and the 24-hr fixed site measurement (r = .68). Correlations of area measurements with Total exposure were weaker because of the dilution effect of Away exposure (r = .64 for Spot-In; r = .61 for 24-h Bedroom). Away and Home exposures were not correlated (r = .14), which reinforced our confidence that the participants used the EMDEX correctly. The data suggest the need for caution before inferences are drawn about total personal exposure from area measurements. The study demonstrates the feasibility of obtaining valid measures of magnetic-field exposure with the personal exposure monitors that have been developed.

Kavet, R.; Silva, J.M.; Thornton, D. (Enertech Consultants, Campbell, CA (United States))

1992-01-01T23:59:59.000Z

130

CX-010727: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27: Categorical Exclusion Determination 27: Categorical Exclusion Determination CX-010727: Categorical Exclusion Determination Dayton Tap Line Retirement CX(s) Applied: B4.10 Date: 08/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to retire and remove the Dayton Tap Line (and associated components) and fund PacifiCorp's removal of associated equipment. The Dayton Tap facility was constructed within PacificCorp's transmission line right-of-way to establish a transmission line tap from PacificCorp's transmission line to a BPA customer. Since the customer will no longer be served via this tap, the Dayton Tap facility is no longer needed. CX-010727.pdf More Documents & Publications CX-003027: Categorical Exclusion Determination

131

CX-010431: Categorical Exclusion Determination | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Administration (BPA) proposes to survey and mark the Rattlesnake-Garrison transmission line right-of-way (ROW) boundary in Missoula County, Montana. CX-010431.pdf More Documents &...

132

Department of Energy - Nebraska  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on National Forest System Lands, Colorado, Utah, and...

133

EIS-0442: EPA Notice of Availability of Draft Environmental Impact...  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact Statement Reauthorization of Permits, Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on...

134

EIS-0442: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Intent to Prepare an Environmental Impact Statement Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on...

135

Native Grass Restoration Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Reader pdf format) on the Oak Ridge Reservation. Native Grass Restoration Projects Power Line Right-of-Way Roadside Re-Vegetation Riparian Restoration SNS Entrance Habitat...

136

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

Science Conference Proceedings (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

137

Performance of Transmission Line Components at Increasing Operating Temperatures  

Science Conference Proceedings (OSTI)

In today's competitive and regulatory environment, utilities are required to maximize power transfer over existing right-of-ways (ROWs). Rather than investing in the expense of upgrading to larger conductors, most utilities are pursuing the lower capital-expense (cost) option of increasing thermal operating limits and pushing more current through existing conductors and associated hardware. As a result, conductors and associated hardware and attachments may be subjected to higher temperatures more freque...

2003-12-08T23:59:59.000Z

138

CX-001121: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

121: Categorical Exclusion Determination 121: Categorical Exclusion Determination CX-001121: Categorical Exclusion Determination Transmission Line Structure Relocation of Existing Oracle-Tucson 115-kilovolt Transmission Line CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Relocate part of Oracle-Tucson 115 kilovolt transmission line in cooperation with Pima County Department of Transportation for their La Canada Drive roadway expansion. This project involves removing 17 existing transmission line pole structures, and will furnish and install 17 new monopoles in a new location within within Western's right-of-way. Western will be using existing access roads and vehicles such as an auger, pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and

139

CX-006253: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

53: Categorical Exclusion Determination 53: Categorical Exclusion Determination CX-006253: Categorical Exclusion Determination North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2 230-Kilovolt Transmission Line Maintenance CX(s) Applied: B4.13 Date: 06/14/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to conduct transmission line maintenance along a portion of the North Bonneville-Ross #1 and North Bonneville-Troutdale #2 230-kilovolt transmission lines. The maintenance activities will take place within the existing transmission line and access road right-of-way easements and includes upgrading existing roads, developing new roads, installing two new wood pole structures and two new steel tower structures.

140

Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California  

SciTech Connect

The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

1994-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Hybrid Transmission Corridor Study: Volume 2: Phase 2--Full-Scale Tests  

Science Conference Proceedings (OSTI)

Adding an HVDC transmission line to an existing right-of-way with an HVAC line can increase power transfer for a given right-of-way width. However, interaction between the two line types can change some electrical effects unless a critical distance is exceeded.

1992-07-14T23:59:59.000Z

142

CX-003195: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95: Categorical Exclusion Determination 95: Categorical Exclusion Determination CX-003195: Categorical Exclusion Determination Oracle-Tucson 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B4.13 Date: 06/10/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to relocate 5 steel monopole transmission line structures on our Oracle-Tucson 115-kilovolt transmission line to accommodate Federal Highway Administration's La Canada Road Widening Project in Tucson. This project involves removing structures 19/4, 19/11, 20/1, 20/2, 20/3, and furnishing and installing 5 new steel monopoles and foundations in a new location within Western's Right of Way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

143

CX-007131: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7131: Categorical Exclusion Determination 7131: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project.

144

CX-006582: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

582: Categorical Exclusion Determination 582: Categorical Exclusion Determination CX-006582: Categorical Exclusion Determination Access Road Maintenance Along the McNary-Santiam 230-Kilovolt and Jones Canyon-Santiam 230-Kilovolt Transmission Line Corridors CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the rights-of-way. The work involves approximately 5,000 linear feet of road reconstruction or improvement work. The roadwork is needed to improve access for crews that will be maintaining the transmission line and towers within the transmission line corridor. The work will consist primarily of

145

CX-007143: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7143: Categorical Exclusion Determination 7143: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using

146

CX-007131: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7131: Categorical Exclusion Determination 7131: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project.

147

CX-007366: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7366: Categorical Exclusion Determination 7366: Categorical Exclusion Determination CX-007366: Categorical Exclusion Determination Inland Power & Light 230-kilovolt Substation Project CX(s) Applied: B4.6 Date: 11/17/2011 Location(s): Washington Offices(s): Bonneville Power Administration To provide a tap point for IP&L, Bonneville Power Administration (BPA) would do the following: 1. Install two new 35-foot tall disconnect switch structures under the BPA Bell-Boundary line located about 50 feet south of tower 5/2 and 50 feet north of tower 5/5. Construction of each lattice-steel, disconnect switch structure would require four holes 6-8 feet deep in a rectangular pattern 34 feet wide (to match the lines above) by 10 feet, and would be located on BPA Right-of-Way (ROW) underneath the existing transmission line. 2. BPA may need to construct a new wood pole

148

CX-000555: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

555: Categorical Exclusion Determination 555: Categorical Exclusion Determination CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to conduct vegetation management activities within the 125-foot transmission line right-of-way and perform maintenance on existing access roads along the Boysen-Pilot Butte 115-kilovolt transmission line in Fremont County, Wyoming. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000555.pdf More Documents & Publications CX-004456: Categorical Exclusion Determination CX-009801: Categorical Exclusion Determination

149

CX-003620: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

620: Categorical Exclusion Determination 620: Categorical Exclusion Determination CX-003620: Categorical Exclusion Determination Structure 57/2 Relocation on the Lovell-Thermopolis 115 Kilovolt Transmission Line CX(s) Applied: B1.3, B4.6 Date: 08/23/2010 Location(s): Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration proposes to relocate structure 57/2 on the Lovell-Thermopolis transmission line. The structure is presently located on the bank of the Greybull River, which is quickly eroding. The structure will be moved approximately 30 feet north of its present location, within the existing transmission line right-of-way. The structure is located on Wyoming State lands. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003620.pdf More Documents & Publications

150

CX-004892: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

92: Categorical Exclusion Determination 92: Categorical Exclusion Determination CX-004892: Categorical Exclusion Determination Oracle-Tucson Transmission Line Structure Relocation CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to relocate part of its Oracle-Tucson 115 kilovolt transmission line in cooperation with Pima County Department of Transportation for their La Canada Drive roadway expansion (Pima County Project Number 4LCRRI). This project involves removing 17 existing transmission line pole structures, and will furnish and install 17 new monopoles in a new location within Western's right-of-way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004892.PDF More Documents & Publications

151

CX-007143: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

43: Categorical Exclusion Determination 43: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using

152

CX-003923: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

923: Categorical Exclusion Determination 923: Categorical Exclusion Determination CX-003923: Categorical Exclusion Determination Mining Equipment Transmission Line Crossing CX(s) Applied: B4.9 Date: 09/16/2010 Location(s): Haskell County, Oklahoma Office(s): Southwestern Power Administration Southwestern Power Administration (Southwestern) proposes to accommodate a request, on behalf of Farrell Cooper Mining Company, to lower and bury a small section of Southwestern's electrical lines to allow for the crossing of a large piece of mining equipment through the transmission line rights-of-way in Haskell County, Oklahoma. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003923.pdf More Documents & Publications CX-007787: Categorical Exclusion Determination CX-007788: Categorical Exclusion Determination CX-010716

153

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facility Location Evaluation for Pebble Springs-Marion 500-KV Line Study Area 75-B.  

SciTech Connect

Proposed is construction of an approximately 160 mile long, 500-kV, double-circuit transmission line from the proposed Pebble Springs Substation located southeast of Arlington, Oregon, to the existing Marion Substation, 11 miles west of Maupin, Oregon. Development is also proposed of a major switching complex, Pebble Springs Substation, near Arlington, Oregon. Depending on the final route chosen, from 45 to 71 miles of parallel, 9 to 42 miles of new, and 74 miles of existing right-of-way will be required. New access road requirements will range from 45 to 90 miles. Land use affected by the proposed facilities includes 800 to 855 acres of forestland removed from timber production. In addition, 50 miles of cropland, primarily wheat, and approximately 35 miles of grassland will be crossed. Disturbance to wildlife during construction will occur and habitat associated with the above land uses will be eliminated. Soil erosion and siltation, primarily during and immediately after construction will also occur. Visual impacts will occur near several highways, lakes, rivers, and recreation areas. Disturbances to nearby residents will occur during construction. An additional 45 acres of rangeland will be required for the proposed Pebble Springs Substation.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

154

An overview of recent large catastrophic landslides in northern British Columbia, Canada  

E-Print Network (OSTI)

OF BURIED PIPELINE VOLTAGES DUE TO 60 Hz AC INDUCTIVE COUPLING PART I - DESIGN OF JOINT RIGHTS-OF-WAY Allen for the reduction of voltages induced on gas transmission pipelines by 60 Hz ac power transmission lines sharing a joint right-of-way. Part I describes how a joint pipeline/power line corridor can be de- signed

Ward, Brent C.

155

Nuclear reactor overflow line  

DOE Patents (OSTI)

The overflow line for the reactor vessel of a liquid-metal-cooled nuclear reactor includes means for establishing and maintaining a continuous bleed flow of coolant amounting to 5 to 10% of the total coolant flow through the overflow line to prevent thermal shock to the overflow line when the reactor is restarted following a trip. Preferably a tube is disposed concentrically just inside the overflow line extending from a point just inside the reactor vessel to an overflow tank and a suction line is provided opening into the body of liquid metal in the reactor vessel and into the annulus between the overflow line and the inner tube.

Severson, Wayne J. (Pittsburgh, PA)

1976-01-01T23:59:59.000Z

156

BlackLining Demo BlackLining Demo  

E-Print Network (OSTI)

BlackLining Demo BlackLining Demo BlackLining Demo YOUR PAYCHECKPAYROLL TAXES AND EMPLOYMENT LAW BY SPONSORED BY #12;BlackLining Demo e BlackLining Demo e BlackLining Demo e AMERICAN PAYROLL ASSOCIATION i Design by PRIWORKS.com. Images from Thinkstock.com. #12;BlackLining Demo BlackLining Demo Black

Harms, Kyle E.

157

Current Status and Potential Impacts Regarding the Proposed Development of a Rail Line to the Yucca Mountain Nuclear Waste Repository  

Science Conference Proceedings (OSTI)

This paper provides a description of the current status regarding the proposed development of a rail line to the Yucca Mountain Nuclear Waste Repository in Nye County, Southern Nevada, which includes potential impacts analyzed during the National Environmental Policy Act (NEPA) process, and the subsequent creation of an Environmental Impact Statement (EIS) for the rail line. Potential impacts are addressed within the context of impacts to natural and human environmental resources found within the geographic area of the proposed federal project. Potential impacts to these resources have been fully analyzed in the Rail Alignment Draft EIS (DEIS). This paper includes a summary of the potential impacts analyzed in the DEIS. Examples of potential impacts include land use conflicts, air quality, water use, and impacts to biological and cultural resources, among others. In conclusion: Based on its obligations under the NWPA and its decision to select the mostly rail scenario for the transportation of spent nuclear fuel and high-level radioactive waste, DOE needs to ship these materials by rail in Nevada to a repository at Yucca Mountain. DOE prepared the Rail Alignment EIS to provide the background, data, information, and analyses to help decision makers and the public understand the potential environmental impacts that could result from constructing and operating a railroad for shipment of spent nuclear fuel, high-level radioactive waste, and other materials from an existing rail line in Nevada to a repository at Yucca Mountain. This railroad would consist of a rail line, railroad operations support facilities, and other related infrastructure. DOE will use the Rail Alignment EIS to decide whether to construct and operate the proposed railroad, and if so, to: - Select a rail alignment (Caliente rail alignment or Mina rail alignment) in which to construct the railroad; - Select the common segments and alternative segments within either a Caliente rail alignment or a Mina rail alignment. The Department would use the selected common segments and alternative segments to identify the public lands to be included in right-of-way applications; - Decide where to construct proposed railroad operations support facilities; - Decide whether to restrict use of the rail line to DOE trains, or whether to allow commercial shippers to operate over the rail line; and - Determine what mitigation measures to implement. (authors)

Lanthrum, G. [U.S. Department of Energy, Office of Civilian Radioactive Waste Management, Washington, DC (United States); Gunnerson, J. [Booz Allen Hamilton, Las Vegas, NV (United States)

2008-07-01T23:59:59.000Z

158

North Australian Cloud Lines  

Science Conference Proceedings (OSTI)

A satellite classification and climatology of propagating mesoscale cloud fines in northern Australia is presented. These cloud fines range from long, narrow lines of shallow convection to extensive deep convective squall lines with mesoscale ...

W. Drosdowsky; G. J. Holland

1987-11-01T23:59:59.000Z

159

CX-007991: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

991: Categorical Exclusion Determination 991: Categorical Exclusion Determination CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission lines. Microsoft Word - CX-Drummond-MacksInn_WoodPoleReplacementFY12_WEB.doc More Documents & Publications CX-009709: Categorical Exclusion Determination EIS-0267: Final Environmental Impact Statement EIS-0285-SA-82: Supplemental Analysis

160

CX-008714: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8714: Categorical Exclusion Determination 8714: Categorical Exclusion Determination CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace 18 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) as well as cross arms on three other structures along the subject transmission lines. Microsoft Word - CX-Alvey-FairviewAlvey-MartinCreek-DrainWoodPolesFY12_WEB.doc More Documents & Publications CX-010344: Categorical Exclusion Determination

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

CX-000833: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

33: Categorical Exclusion Determination 33: Categorical Exclusion Determination CX-000833: Categorical Exclusion Determination Flaming Gorge-Vernal Number 3 Transmission Line Vegetation Management, Uintah County, Utah CX(s) Applied: B1.3 Date: 01/22/2010 Location(s): Uintah County, Utah Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to cut trees in the existing transmission line right-of-way between structures 32/2 to 35/6 and 36/4 to 39/3. This approximately 6.3 mile section is located on private land in Uintah County, east of Vernal, Utah in T4S, R21E, sections 12, 13; T4S, R22E, sections 18, 19, and 20; T5S, R22E, sections 5 and 8 of the Salt Lake Meridian. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000833.pdf More Documents & Publications

162

CX-006300: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

00: Categorical Exclusion Determination 00: Categorical Exclusion Determination CX-006300: Categorical Exclusion Determination Murray Hill Recreation Association Permission to Cross Keeler-Oregon City Transmission Line CX(s) Applied: B4.9 Date: 07/21/2011 Location(s): Washington County, Oregon Office(s): Bonneville Power Administration The Murray Hill Recreation Association has requested permission to cross the Bonneville Power Administration (BPA) right-of-way under the Keeler-Oregon City and Oregon City Stub corridor in order to access the rear of their sports complex to conduct periodic maintenance. The current project proposes to stockpile sand and transport it along an existing roadway beneath the lines to the athletic fields on their complex. The proposal further requests permission to access their complex two-to-three

163

CX-007167: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

167: Categorical Exclusion Determination 167: Categorical Exclusion Determination CX-007167: Categorical Exclusion Determination Rogers-Coolidge Danger Tree Removal CX(s) Applied: B1.3 Date: 02/18/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to cut down four Palo Verde trees using hand tools, under our existing Rogers-Coolidge 230-kilovolt transmission line, within Western's existing right-of-way between Structures 35/4 and 36/2 on the Gila River Indian Reservation, Pinal County, Arizona. Western will be using pickup trucks along the existing access road located west of the transmission line to bring personnel and equipment to the work areas. This work is necessary to maintain the safety and reliability of the bulk

164

CX-001489: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-001489: Categorical Exclusion Determination Fort Randall-Sioux City Hazard Tree and Vegetation Control/Removal CX(s) Applied: B1.3 Date: 03/29/2010 Location(s): Sioux City, Iowa Office(s): Western Area Power Administration-Upper Great Plains Region Western Area Power Administration (WAPA) proposes to remove hazardous trees and other woody vegetation within 30 feet of the transmission line conductor, or that could fall within 30 feet of the conductor, on WAPA's existing Fort Randall-Sioux City 230 kilovolt transmission line right-of-way between structures 107/4 and 109/5. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-001489.pdf More Documents & Publications CX-007166: Categorical Exclusion Determination CX-010105: Categorical Exclusion Determination

165

CX-005410: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

410: Categorical Exclusion Determination 410: Categorical Exclusion Determination CX-005410: Categorical Exclusion Determination North Bonneville-Alcoa Number 1 and 2 Transmission Line Corridor CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road reconstruction work to improve vehicle access to structures 16/6, 16/7 and 17/1 of the North Bonneville-Alcoa Number 1 and 2 transmission line corridor from southeast 37th Street to the right-of-way, then to structure 16/6 to the east, and structure 17/1 to the west. The total distance of this project is approximately 2200 feet. Project work may include, but is not limited to: vegetation removal to clear a 20-foot width, grading and

166

CX-001180: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1180: Categorical Exclusion Determination 1180: Categorical Exclusion Determination CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace an existing dilapidated bridge across Little Pilchuck Creek, install three culverts in drainage ditches near the bridge, and repair 2,000 feet of existing on and off right-of-way (ROW) access roads along mile 16 of the Monroe-Custer Number 1 and Number 2 transmission Lines. Project work includes: excavation for bridge removal and installation, grading and shaping of roads, placing

167

CX-005422: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

422: Categorical Exclusion Determination 422: Categorical Exclusion Determination CX-005422: Categorical Exclusion Determination La Pine Chiloquin and Brasada Harney Number 1 Transmission Line Right-of-Ways CX(s) Applied: B1.3 Date: 03/15/2011 Location(s): Klamath County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. crossarms, insulators, guy anchors) along the subject transmission lines. Pole replacement will be in-kind and will utilize the existing holes to minimize ground disturbance. If necessary, an auger will be used to remove any loose soil from the existing hole prior to new wood pole replacement. Landing construction is not planned or anticipated at these locations.

168

CX-008790: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-008790: Categorical Exclusion Determination Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). CX-008790.pdf More Documents & Publications CX-009411: Categorical Exclusion Determination

169

CX-003218: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18: Categorical Exclusion Determination 18: Categorical Exclusion Determination CX-003218: Categorical Exclusion Determination Renewable Energy and Energy Efficiency Revolving Loan Program RO Ranch Hydro Project CX(s) Applied: B1.15, B4.11, B5.1 Date: 08/02/2010 Location(s): Nye County, Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office The Nevada State Office of Energy will provide $522,000 in Recovery Act funds to Truckee River Ranch, LLC (Truckee) to install a 225 kilowatt hydropower plant and associated 2.3 mile transmission line. The hydropower portion of this work will occur at the RO Ranch, located in Nye County at T12N R42E Section 12 Northeast Southwest. The property is owned by Truckee. The approximate 2.3 miles of transmission line will follow a Right-of-Way

170

CX-009230: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30: Categorical Exclusion Determination 30: Categorical Exclusion Determination CX-009230: Categorical Exclusion Determination Curecanti-Rifle 230 Kilovolt Transmission Line Sullivan Ranch Irrigation Water Pipeline Project Between Structures 25/5 to 26/1 CX(s) Applied: B4.9 Date: 09/28/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to grant permission to Mr. Dan Sullivan for the Sullivan Ranch Pipeline Project on Western's right-of-way (ROW) between structures 25/5 to 2611 on the Curecanti-Rifle (CCI-RFL) 230 kilovolt Transmission Line. CX-009230.pdf More Documents & Publications CX-010110: Categorical Exclusion Determination CX-010413: Categorical Exclusion Determination EIS-0442: Draft Environmental Impact Statement

171

CX-003089: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination Perform Routine Access Road Maintenance Within the Big Eddy-Ostrander Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/25/2010 Location(s): Hood River County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers approximately 1.5 miles of road. The

172

CX-003085: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

085: Categorical Exclusion Determination 085: Categorical Exclusion Determination CX-003085: Categorical Exclusion Determination Boyer-Tillamook Number 1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 06/21/2010 Location(s): Tillamook County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to rebuild and/or repair existing access road and right-of-way (ROW) road in its Eugene Region that provides access to the Boyer-Tillamook Number 1 transmission line and ROW access for sites 3, 4, 6, 7, 9, 12 and 14 between mile/structure 9/3 and 24/5. Project work includes, but is not limited to: reshaping, grading and compacting existing road surfaces and turnouts; hauling, placing, and shaping of aggregate and Riprap; constructing or reconditioning of water

173

CX-006583: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-006583: Categorical Exclusion Determination Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration Maintenance activities will take place within the existing transmission line right-of-way easement and include upgrading existing access roads, relocating or constructing short spur roads to structures, constructing equipment landings and performing maintenance on structures. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006583.pdf More Documents & Publications CX-006580: Categorical Exclusion Determination CX-010424: Categorical Exclusion Determination

174

CX-008380: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80: Categorical Exclusion Determination 80: Categorical Exclusion Determination CX-008380: Categorical Exclusion Determination Archer to Ault 230 Kilovolt Transmission Line Structure Replacement, Weld County, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to replace an existing three pole wood structure along the Archer to Ault 230 kilovolt (kV) transmission line. The structure is located on private land adjacent to County Road 27 northwest of the town of Nunn in Weld County, Colorado. The structure will be replaced in-kind with wood poles of the same height, hardware, configuration, and at the same location. All work will be confined to Western's right-of way easement.

175

CX-006794: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-006794: Categorical Exclusion Determination Naselle-Tarlett Nature Conservancy Access Road Funding CX(s) Applied: B1.13 Date: 09/12/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration In 2010, the Nature Conservancy (property owner), in accordance to agreements with Bonneville Power Administration (BPA), abandoned several sections of legal and usable access roads leading to BPA?s Nasselle-Tarlett 115-kilovolt transmission line corridor. The Nature Conservancy has constructed new, more environmentally friendly sections of access roads on their property to provide BPA alternate access the transmission line right-of-way and structures. BPA proposes to purchase easement rights and provide funding to partially cover construction costs of the new road

176

CX-003090: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off (Ha-o-AR-125-1, 125-2, BC-AR-32) the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers

177

CX-006575: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6575: Categorical Exclusion Determination 6575: Categorical Exclusion Determination CX-006575: Categorical Exclusion Determination Fairview-Rogue Access Road Maintenance Project CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road maintenance activities along the access roads of the BPA Fairview-Rogue 230-kilovolt transmission line between Fairview Substation and State Highway 42. Approximately 8,800 feet of selected roads, which lay on and off of the BPA right-of-way (ROW), will be maintained as part of the proposed project. The proposed access road project is part of on-going operations and maintenance along this line and this work is proposed for 2011. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

178

CX-005846: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

846: Categorical Exclusion Determination 846: Categorical Exclusion Determination CX-005846: Categorical Exclusion Determination Wood Pole Replacement and Minor Access Road Maintenance Along Various Transmission Line Rights-Of-Way in the Wenatchee District CX(s) Applied: B1.3 Date: 05/04/2011 Location(s): Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission line. Replacement will be in-kind and will utilize the existing holes to minimize ground disturbance. If necessary, an auger will be used to remove any loose soil from the existing hole prior to new wood pole placement. New landing construction is not planned or anticipated at these locations.

179

CX-005852: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

852: Categorical Exclusion Determination 852: Categorical Exclusion Determination CX-005852: Categorical Exclusion Determination Stegall-Wayside 230 Kilovolt Access Road Extension CX(s) Applied: B1.13 Date: 05/05/2011 Location(s): Dawes County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration plans to construct an extension of an existing access road between structures 111-1 and 111-2 on the Stegall-Wayside 230 kilovolt transmission line. This road construction will provide access for removal of previously felled hazard trees along the transmission line right-of-way on private land. The project will extend the existing access road to the south from its present terminus at structure 111-1 and terminate before reaching structure 111-2. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

180

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Germ-line Allele  

NLE Websites -- All DOE Office Websites (Extended Search)

Germ-line Allele Germ-line Allele Name: Rachel Location: N/A Country: N/A Date: N/A Question: Can you please explain a "germ-line allele" to me! It is very important for a research paper I am writing about breast cancer. Replies: Mutations in genes are only able to be passed to the offspring if they are found in gametes (egg, sperm) mutations that occur in body cells other than gametes are usually not important because the cells can be replaced and they die eventually. The only way a characteristic can be passed to the offspring is through the eggs and sperm, so if there is a mutation in one these cells, the offspring can inherit the mutation. So a germ-line cell is a gamete. And a germ line allele is a version of the trait that is passed to the offspring through the germ line cell (or gamete).

182

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

183

New Construction of Distribution Lines, Service Lines, and Appurtenant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resources Outside Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant...

184

The courts and electromagnetic fields  

Science Conference Proceedings (OSTI)

This article examines the recent development in eminent domain cases involving power transmission line rights of way, the issue of fear of the mythical buyer. The author feels that the fear of electrocution or of the possible cancer-inducing effects of electromagnetic fields is greatly influencing court decisions in these cases. The results could be more expensive rights of way acquisition by utilities.

Freeman, M. (Univ. of Pennsylvania, Philadelphia (United States))

1990-07-19T23:59:59.000Z

185

CX-008789: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-008789: Categorical Exclusion Determination Routine Maintenance of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado CX(s) Applied: B1.3 Date: 05/22/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 0/2 to 1/3, 3/2, 8/1, 8/6, 9/6 to 9/7, 12/2 to 14/2, 15/5, 17/2, 17/3, 36/5, 37/1, 43/2, 47/2, 47/4, and 56/4 (approximately 60 miles).

186

CX-007139: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39: Categorical Exclusion Determination 39: Categorical Exclusion Determination CX-007139: Categorical Exclusion Determination Electrical District 2- Electrical District 5 Geological Boring CX(s) Applied: B3.1 Date: 05/16/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to do geologic borings within our right-of-way near structures 21/5, 22/5, 23/6, 25/4, 26/5, 27/6, 28/5, 29/5 & 30/4 along the existing electrical district (ED) #2-ED5 230-kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring

187

CX-003352: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

352: Categorical Exclusion Determination 352: Categorical Exclusion Determination CX-003352: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant Oklahoma Department of Commerce #6, City of Wynoka CX(s) Applied: B4.13, B5.1 Date: 08/13/2010 Location(s): Wynoka, Oklahoma Office(s): Energy Efficiency and Renewable Energy, Golden Field Office The City of Wynoka, Oklahoma is proposing to use $250,000 of Energy Efficiency and Conservation Block Grant funding for the City Electrical System Upgrade Project which will involve the retrofitting of approximately 49 existing transformers and electrical poles. All work will be done within the existing transmission line right-of-way (ROW). DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003352.pdf More Documents & Publications CX-009745: Categorical Exclusion Determination

188

CX-006791: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6791: Categorical Exclusion Determination 6791: Categorical Exclusion Determination CX-006791: Categorical Exclusion Determination Big Eddy-Chemawa Utility Pole Installation for City of Wilsonville Kinsman Road/Barber Street Extension CX(s) Applied: B4.6 Date: 09/09/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to add one steel pole onto its 230 kilovolt Big Eddy-Chemawa transmission line at the sag between towers 94/2 and 94/3. The addition is to accommodate a City of Wilsonville road project, the Kinsman Road and Barber Street extension projects. All work will be conducted by BPA crews within previously disturbed soils along the existing right-of-way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006791.pdf More Documents & Publications

189

CX-007130: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30: Categorical Exclusion Determination 30: Categorical Exclusion Determination CX-007130: Categorical Exclusion Determination Casa Grande-Empire CX(s) Applied: B3.1 Date: 09/14/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to do geologic borings within our right-of-way near structures 18/5, 19/6, 21/2, 2317, 26/4, 28/4, 36/1, 37/5, 39/4 and 41/4 along the existing Casa Grande-electrical district #5 115-kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas.

190

CX-000330: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30: Categorical Exclusion Determination 30: Categorical Exclusion Determination CX-000330: Categorical Exclusion Determination West Virginia Revision 1 - Energy Efficiency in State Buildings: Corrections - Project 1 Huttonsville Correctional Center CX(s) Applied: B1.31, B2.5, B5.1, B5.4, B5.5 Date: 12/02/2009 Location(s): Huttonsville, West Virginia Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory Replacement of oil-fired boiler with new natural gas boiler; upgrade of 7 miles of existing 4 inch natural gas pipe line with 8 inch pipeline in existing right-of-way; 0.6 mile of new pipeline across prison property. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000330.pdf More Documents & Publications CX-000324: Categorical Exclusion Determination CX-000312: Categorical Exclusion Determination

191

CX-004889: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-004889: Categorical Exclusion Determination Casa Grande-Empire (Geological Boring) CX(s) Applied: B3.1 Date: 08/19/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to do geologic boring within our right-of-way at structures 18/2, 21/2, 25/1, 37/5, and 41/5 along the existing Casa Grande-Empire 115 kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004889.pdf More Documents & Publications CX-007130: Categorical Exclusion Determination

192

CX-007170: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70: Categorical Exclusion Determination 70: Categorical Exclusion Determination CX-007170: Categorical Exclusion Determination Saguaro-Tucson Vegetation Removal CX(s) Applied: B1.3 Date: 03/30/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to remove vegetation under its existing Saguaro-Tucson 115-kilovolt transmission line, within Western's existing right-of-way between Structures 5/3 and 6/3 in Pinal County, Arizona. We plan on using existing access roads to the vegetation removal areas. Western will be using a front-end loader with a cutting & shredding attachment to remove the vegetation. This work is necessary to maintain the safety and reliability of the bulk electrical system. CX-007170.pdf More Documents & Publications

193

CX-007169: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

169: Categorical Exclusion Determination 169: Categorical Exclusion Determination CX-007169: Categorical Exclusion Determination Saguaro-Oracle Vegetation Removal CX(s) Applied: B1.3 Date: 04/07/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct vegetation removal between structures 0/3 and 0/4, 1/5 and 1/6, 3/1 and 3/2, 4/2 and 4/3, around structure 4/8, between structures 5/1 and 5/2 and around structure 5/4 of its Saguaro-Oracle 115- kilovolt transmission line, within Western's existing right-of-way. Western will access the vegetation removal areas using crew trucks along the existing access roads. Western will use a front end loader with a cut shredder attachment to knock down and chip wood vegetation. The debris will

194

Categorical Exclusion Determinations: B4.12 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Categorical Exclusion Determinations: B4.12 Existing Regulations B4.12: Construction of powerlines Construction of electric powerlines approximately 10 miles in length or less, or approximately 20 miles in length or less within previously disturbed or developed powerline or pipeline rights-of-way. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD July 25, 2013 CX-010577: Categorical Exclusion Determination Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington

195

CX-007515: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15: Categorical Exclusion Determination 15: Categorical Exclusion Determination CX-007515: Categorical Exclusion Determination Bucknam Temporary Tap, Natrona County, Wyoming CX(s) Applied: B4.6 Date: 12/15/2011 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration is entering into an agreement with Tri-State Generation and Transmission to provide a temporary tap with mobile equipment to be placed until a facility study can be done for permanent construction. This Categorical Exclusion is for the installation of a temporary mobile transformer within Western's right of way (ROW) easement on Bureau of Land Management land along the Casper-Arminto 115 kilovolt transmission line 50 feet north of structure 23/8. The project will require a temporary tap, pad location, temporary fencing around the

196

CX-007811: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11: Categorical Exclusion Determination 11: Categorical Exclusion Determination CX-007811: Categorical Exclusion Determination "Decommission Ground Water Monitoring Well Located on Bonneville Power Administration (BPA) Fee-owned Property CX(s) Applied: B3.1 Date: 12/14/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to allow Seattle City Light access to a BPA fee-owned right-of-way (ROW) for the purpose of decommissioning a Seattle City Lightowned well. Seattle City Light historically installed ground water monitoring wells as part of the Boundary Dam licensing process in the 1950s and 1960s to study the impact of the Dam on ground water levels. One of these wells exists on BPA fee-owned ROW approximately 650 feet ahead-on-line from tower 107/1 [Ref

197

CX-003236: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36: Categorical Exclusion Determination 36: Categorical Exclusion Determination CX-003236: Categorical Exclusion Determination Augspurger Fiber Replacement Project CX(s) Applied: B1.7, B4.7 Date: 07/21/2010 Location(s): Skamania County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to bury approximately 7 miles of existing aerial fiber along the North Bonneville-Midway #1 transmission line right-of-way (ROW) between towers 12/4 and 20/1. The existing aerial fiber would be replaced with two reels of 72-strand loose tube fiber optic cable (maximum reel length is 39,370 feet). Two 2-inch diameter High Density Poly Ethylene conduits would be buried approximately 48 inches below ground. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003236.pdf More Documents & Publications

198

CX-010147: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Categorical Exclusion Determination 7: Categorical Exclusion Determination CX-010147: Categorical Exclusion Determination Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 04/19/2013 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kV transmission line corridor in the City of Beaverton, Oregon. Microsoft Word - CX_Memo_Amended_TVWD.docx More Documents & Publications CX-009697: Categorical Exclusion Determination CX-009701: Categorical Exclusion Determination CX-010145

199

CX-009701: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

701: Categorical Exclusion Determination 701: Categorical Exclusion Determination CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to grant a Land Use Review Request (LURR) submitted by Williams Northwest Pipeline (WNP) to replace a portion of their 10-inch diameter South Seattle 2454 loop natural gas pipeline within their existing easement on BPA fee-owned right-of-way (ROW) within BPA's Maple Valley-Echo Lake transmission line corridor in King County, Washington. CX-009701.pdf More Documents & Publications CX-008680: Categorical Exclusion Determination EIS-0317-S1: Draft Supplemental Environmental Impact Statement

200

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2011 21, 2011 CX-007750: Categorical Exclusion Determination Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration December 16, 2011 Cows like these in Skagit County, Washington, supply the biodigester developed by Kevin Maas of Farm Power up to 70,000 gallons of manure per day. The newest Farm Power facility in Washington generates enough electricity to power 500 homes. Photo courtesy of sea_turtle. Farming Out Heat and Electricity through Biopower The newest biodigester at the Farm Power facility in Washington generates electricity from biogas created from bacteria's anaerobic digestion of cow

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

CX-004876: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4876: Categorical Exclusion Determination 4876: Categorical Exclusion Determination CX-004876: Categorical Exclusion Determination Casa Grande-Empire (Double Circuit Upgrade) CX(s) Applied: B4.13 Date: 09/15/2010 Location(s): Pinal County, Arizona Office(s): Bonneville Power Administration Western proposes to work with Salt River Project on an upgrade to a double circuit on its Casa Grande-Empire 115 kilowatt transmission line. This project involves the removal of the existing H-frame wooden structures and the installation of new steel monopole structures. This will require auger trucks, bulldozers, bucket trucks and cranes. Existing access roads and the existing right-of-way will be used for vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the

202

CX-005847: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

847: Categorical Exclusion Determination 847: Categorical Exclusion Determination CX-005847: Categorical Exclusion Determination Rocky Reach - Maple Valley Access Road Repair CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): King County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to build and/or repair approximately 18,000 feet of access road and right-of-way road that provides access to the Rocky Reach-Maple Valley Number 1 transmission line in King County, Washington. The work is necessary to repair damage done to access roads caused by a major flood event that occurred on November 7, 2006, and thus provide continued system stability. The project includes but is not limited to: - Reconstruction (blading, reshaping, grading, and compacting) of existing road surfaces - Hauling, placing, and shaping of

203

Power line detection system  

DOE Patents (OSTI)

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

Latorre, V.R.; Watwood, D.B.

1994-09-27T23:59:59.000Z

204

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

205

Power line detection system  

DOE Patents (OSTI)

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

Latorre, Victor R. (Tracy, CA); Watwood, Donald B. (Tracy, CA)

1994-01-01T23:59:59.000Z

206

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

207

EIS-0285-SA-57: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Vegetation Management Program Vegetation Management along the Trojan-Allston Transmission Lines 1 and 2 Right Of Ways between 11 and 91. The lines are 230 kV Single...

208

Categorical Exclusion Determinations: B1.13 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2010 21, 2010 CX-002690: Categorical Exclusion Determination Pajarito Road Right-Of-Way Shift at TA-50 and TA-55 CX(s) Applied: B1.13 Date: 04/21/2010 Location(s): New Mexico Office(s): Los Alamos Site Office April 2, 2010 CX-006727: Categorical Exclusion Determination Weirbox Installation CX(s) Applied: B1.6, B1.13, B2.5, B3.1, B5.4, B6.3 Date: 04/02/2010 Location(s): Casper, Wyoming Office(s): RMOTC March 31, 2010 CX-001386: Categorical Exclusion Determination Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing Bridge CX(s) Applied: B1.13, B1.3 Date: 03/31/2010 Location(s): Spokane County, Washington Office(s): Bonneville Power Administration March 24, 2010 CX-001206: Categorical Exclusion Determination Tehachapi Wind Energy Storage

209

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Construction of Distribution Lines, Service Lines, and New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Environmental Regulations Provider New York State Public Service Commission Any proposed construction of distribution lines, service lines, and appurtenant facilities to electric utilities located near scenic areas of

210

2005 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

U.S. Energy Information Administration (EIA)

2010 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE. Kerosene. ... • Geothermal energy drilling company • Logging company •Privately owned port or loading dock

211

SPEAR3 Beam Line Availability  

NLE Websites -- All DOE Office Websites (Extended Search)

Beam Line Support | Floor Support | Administrative Support SPEAR3 Beam Line Availability Beam Line BL Type Technique(s) Status 1-4 X-ray Small and Wide Angle X-ray Scattering Open...

212

Hybrid Transmission Corridor Study: Volume 1: Phase 1--Scale Model Development  

Science Conference Proceedings (OSTI)

Installation of HVDC transmission lines on existing rights- of-way with HVAC lines can increase power transfer for a given right-of-way width. This phase of the hybrid transmission corridor study developed a model for predicting the electrical effects between HVAC and HVDC lines in a hybrid corridor. The work underscores the importance of maintaining a critical separation between the two lines.

1992-07-14T23:59:59.000Z

213

Utility Line Inspections and Audits  

Science Conference Proceedings (OSTI)

Utility Line Inspections and Audits provides utility engineers with a concise reference for the pros, cons, and how to related to performing various line inspections and audits.

2007-03-21T23:59:59.000Z

214

Beam-line cryopump  

DOE Green Energy (OSTI)

A cryopumping module using metallic surfaces at liquid helium temperature for condensation of hydrogen and deuterium gas has been constructed. This pump, a prototype of four units which will provide pumping for the Livermore 200 kV test stand, will be used to verify the concept and establish engineering parameters. Upon completion of engineering tests and evaluation the pump will be installed in an operating beam line. The design point pumping capacity is 80,000 liters per second for hydrogen and deuterium at 10$sup -4$ torr based on sticking coefficients of 0.15 and 0.25, respectively. Both the liquid helium temperature pumping surface and the liquid nitrogen temperature radiation shields are constructed of quilted double wall cylindrical shells. The pumping shell dimensions are 1.5 meters dia. x 0.6 meters long. Cryogen circulation is convection current driven in both cases. Liquid helium is supplied from an overhead Dewar through bayonet coupling. In the 200 kV beam line, pumping modules will be supplied via transfer lines from a central Dewar. Voltage standoff will be accomplished in the transfer lines. (auth)

Duffy, T.J.; Oddon, L.D.

1975-11-12T23:59:59.000Z

215

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

216

On line course organization  

Science Conference Proceedings (OSTI)

In order to help users access on-line materials with more specific questions, we build a learning portal named Fusion. First we develop Fusion-Crawler, a link classification focused crawler, to download potential course pages. We then use a binary classifier ... Keywords: focused crawling, learning object management, metadata extraction, ontology

Ming Zhang; Weichun Wang; Yi Zhou; Yu Yang; Yuhong Xiong; Xiaoming Li

2007-08-01T23:59:59.000Z

217

Stereoscopic 3D line drawing  

Science Conference Proceedings (OSTI)

This paper discusses stereoscopic 3D imaging based on line drawing of 3D shapes. We describe the major issues and challenges in generating stereoscopic 3D effects using lines only, with a couple of relatively simple approaches called each-eye-based and ... Keywords: binocular rivalry, line drawing, line stylization, non-photorealism, stereo coherence, stereoscopy

Yongjin Kim; Yunjin Lee; Henry Kang; Seungyong Lee

2013-07-01T23:59:59.000Z

218

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

219

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

220

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

222

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

223

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction of Distribution Lines, Service Lines, and Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) < Back Eligibility Commercial Installer/Contractor Institutional Investor-Owned Utility Low-Income Residential Multi-Family Residential Municipal/Public Utility Residential Rural Electric Cooperative Schools Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Home Weatherization Water Buying & Making Electricity Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any proposed construction of electricity-related facilities in residential

224

Commercial Lining Products  

Science Conference Proceedings (OSTI)

Table 1   Comparative ranking of rubber lining materials...Heat Oxidation Ultraviolet Abrasion Weathering Oil Motor fuels Acid Alkali Flame Natural rubber NR 5 4 4 4 4 6 6 3 3 6 Styrene-butadiene SBR 4 3 3 2 4 5 6 3 3 6 Nitrile NBR 3 3 3 2 3 1 6 4 4 6 Chloroprene CR 2 2 2 3 2 2 3 1 2 2 Chlorosulfonylpolyethylene CSM 2 2 2 3 2 2 2 2 2 3 Isobutylene-isoprene...

225

Strong Lines of Mercury ( Hg )  

Science Conference Proceedings (OSTI)

... Mercury (Hg) Homepage - Introduction Finding list Select element by name. Select element by atomic number. ... Strong Lines of Mercury ( Hg ). ...

226

Strong Lines of Plutonium ( Pu )  

Science Conference Proceedings (OSTI)

... Plutonium (Pu) Homepage - Introduction Finding list Select element by name. Select element by atomic number. ... Strong Lines of Plutonium ( Pu ). ...

227

IPF Overhead Line Uprating Wizard  

Science Conference Proceedings (OSTI)

The Increased Power Flow (IPF) Wizard ranks various line uprating methods available on the basis of a series of relatively simple questions about the rating increase needed, the condition of the line, regulatory restrictions, and basic design parameters of the existing line. The Wizard’s knowledge base contains 17 different uprating methods selected and defined by the contractors. A series of 22 questions concerning such variables as line rating assumptions, physical condition, and permitting were define...

2009-03-17T23:59:59.000Z

228

Strong Lines of Hydrogen ( H )  

Science Conference Proceedings (OSTI)

... Hydrogen (H) Homepage - Introduction Finding list Select element by name. Select element by atomic number. ... Strong Lines of Hydrogen ( H ). ...

229

Strong Lines of Tungsten ( W )  

Science Conference Proceedings (OSTI)

... Tungsten (W) Homepage - Introduction Finding list Select element by name. Select element by atomic number. ... Strong Lines of Tungsten ( W ). ...

230

CX-010427: Categorical Exclusion Determination | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

which is located within PacifiCorp's McNary-Wallula 230-kilovolt (kV) transmission line right-of-way (ROW). CX-010427.pdf More Documents & Publications CX-010425: Categorical...

231

CX-010425: Categorical Exclusion Determination | Department of...  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Administration (BPA) proposes to survey and mark the Pearl-Keeler Number 1 transmission line right-of-way boundary in Washington County, Oregon. CX-010425.pdf More...

232

DOE - Office of Legacy Management -- Brunswick2_FUSRAP  

NLE Websites -- All DOE Office Websites (Extended Search)

additional radiological data on drain lines entering a sanitary sewer in the public right of way. DOE found no indication of above-background radioactivity. Final Conditions-A...

233

Exceeding the posted speed limit in parking lots  

NLE Websites -- All DOE Office Websites (Extended Search)

roadways. Not coming to a complete stop at posted stop signs. Failure to yield right-of-way to vehicles where required, or to pedestrians. Crossing a double yellow line to pass...

234

Assessment of Non-Native Invasive Plant Species on the United...  

NLE Websites -- All DOE Office Websites (Extended Search)

lobata (Willd.) Maesen and S.M. Almeida is a notorious invader of roadsides and power transmission line rights-of-way in the southeastern United States, but it is seldom found...

235

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 02 to 13, 32, 81, 86, 96 to 97, 122 to 142, 155,...

236

Riparian Rights: State Land (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

The state reserves the power to sell, transfer, and convey, as provided by law, rights-of-way in public land for several purposes, including pipelines, gas pipelines, water pipelines, sewer lines,...

237

EIS-0285-SA-55: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

500 kV line. BPA proposes to clear unwanted vegetation in the rights-of- ways and around tower structures that may impede the operation and maintenance of the subject transmission...

238

ENVIRONMENTAL REVIEW for CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

noxious weeds along its right-of-way (ROW) on the Curecanti to Lost Canyon (CCI-LCN) transmission lines from structure numbers 433 to 734 and 883 to 922. The proposed...

239

GRR/Section 8-CO-a - State Transmission | Open Energy Information  

Open Energy Info (EERE)

Will the Transmission Encroach on a State Highway ROW? If the developer intends to build transmission lines that encroach on state highway rights-of-way, it will need to acquire a...

240

ENVIRONMENTAL REVIEW for CATEGORICAL EXCLUSION DETERMINATION  

NLE Websites -- All DOE Office Websites (Extended Search)

and treat noxious weeds along its right-of-way (ROW) on the Hesperus to Montrose (HS-MTR) transmission lines from structure numbers 126 to 254. The proposed action would occur...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Arizona | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Parker-Planet Tap 69-kV Transmission Line Rebuild, Upgrade and Right-Of-Way Action July 6, 2011 EIS-0480: Notice of Intent to Prepare a Draft...

242

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

243

2005 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

U.S. Energy Information Administration (EIA) Indexed Site

Page 1 Page 1 2012 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE Kerosene Line No. Sold directly to consumers for: 1 Residential Use (Non-Farm): * Backup generator * Home heating and cooking * Personal lawn equipment * EXCLUDE: Apartment buildings and Farmhouses 2 Commercial Use: * Apartment building * Bank * Casino * Church * College/School/Institution * Department/Retail store * Environmental clean-up service * Flushing fuel lines * Forestry service * Golf course * Government (Federal, State, local, and district; INCLUDE fuel used in vehicles) * Hazardous waste company * Hospital * Hotel/Motel * Landfill site government owned * Landscaping * Laundry company * Lumber yard that sells the lumber * Medical service * Port Authority/publicly owned port or loading dock

244

Western Area Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

v*Zy- i , . v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's line to relieve congestion in the Sacramento area. In addition, Western has rights-of- way for many transmission lines that could be rebuilt to increase transmission capacity. For example, Western's Tracy-Livermore 230-kV line is a single circuit line but the existing towers could support a double circuit line. These rights-of-way would have to

245

HVDC Overhead Line Performance Study  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) is documenting the various factors that should be considered when designing and building new high-voltage direct current (HVDC) lines or when converting AC lines to HVDC. Given the limited number of HVDC lines that have been designed and built around the world, even some basic factors (for example, insulator flashover in severely contaminated regions) are not completely understood. This report concerns a crucial first step in better understanding and improving...

2011-08-02T23:59:59.000Z

246

Transmission Line Design and Construction  

Science Conference Proceedings (OSTI)

The power industry wants to construct reliable and cost-effective overhead lines. A reliable and cost effective line requires not only that the line and structures meet design criteria for strength, clearances, and electrical considerations, but also that it be designed for safe and easy construction and maintenance. Design and construction practices should therefore go hand in hand. Information among various departments within a utility has to be shared for mutual benefit. Communication is a key ...

2012-12-31T23:59:59.000Z

247

The Pulse Line Ion Accelerator Concept  

E-Print Network (OSTI)

be modeled as a transmission line with equivalent inductancez , t ) (see Fig. 1), the transmission line equations in thethese elementary transmission line equations are traveling

Briggs, Richard J.

2006-01-01T23:59:59.000Z

248

LINE-ABOVE-GROUND ATTENUATOR  

DOE Patents (OSTI)

The line-above-ground attenuator provides a continuously variable microwave attenuator for a coaxial line that is capable of high attenuation and low insertion loss. The device consists of a short section of the line-above- ground plane type transmission lime, a pair of identical rectangular slabs of lossy material like polytron, whose longitudinal axes are parallel to and indentically spaced away from either side of the line, and a geared mechanism to adjust amd maintain this spaced relationship. This device permits optimum fineness and accuracy of attenuator control which heretofore has been difficult to achieve.

Wilds, R.B.; Ames, J.R.

1957-09-24T23:59:59.000Z

249

CX-007356: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-007356: Categorical Exclusion Determination "Grant New Cingular Wireless' request for use of right-of-way at the Salem Substation CX(s) Applied: B4.9 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by New Cingular Wireless. BPA issued a CX for this project on September 19, 2011, however New Cingular Wireless slightly modified the location of the conduit and vault, and has resubmitted the right-of-way application. New Cingular Wireless proposes to place an approximately 140 foot long, 4 inch underground conduit from its existing wireless communications facility to an existing BPA utility pole located in a BPA right-of-way. A proposed

250

Applications of Line Profile Analysis  

Science Conference Proceedings (OSTI)

Feb 16, 2010 ... Neutron and X-Ray Studies of Advanced Materials III : Applications of Line Profile ... Science: Robert Von Dreele1; 1APS/Argonne National Laboratory .... using an X-ray synchrotron beam line of the Advanced Photon Source.

251

Software Tackles Production Line Machine ?Cyclic Jitters?  

Science Conference Proceedings (OSTI)

Software Tackles Production Line Machine 'Cyclic ... products, even shutting down assembly lines. ... high-speed data transmission characteristics of ...

2011-07-18T23:59:59.000Z

252

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

253

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

254

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

255

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

256

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

257

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

258

Shape optimization using reflection lines  

Science Conference Proceedings (OSTI)

Many common objects have highly reflective metallic or painted finishes. Their appearance is primarily defined by the distortion the curved shape of the surface introduces in the reflections of surrounding objects. Reflection lines are commonly used ...

E. Tosun; Y. I. Gingold; J. Reisman; D. Zorin

2007-07-01T23:59:59.000Z

259

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

260

fault diagnosis of a high voltage transmission line using waveform ...  

E-Print Network (OSTI)

Oct 4, 2013 ... FAULT DIAGNOSIS OF A HIGH VOLTAGE TRANSMISSION LINE USING ... Fault types such as single line to ground, line to line, double line to ...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Two terminal line voltage thermostat  

Science Conference Proceedings (OSTI)

A two terminal line voltage thermostat includes a switch which effectively connects line voltage to a heater load. The entire process is controlled by an integrated circuit microcontroller which is powered by a rectified voltage from a transformer secondary connected to a primary which is in series with the heater load. Backup battery power is provided to maintain limited functions of the microcontroller in the event of overall power loss. The microcontroller is programmed to meet the temperature sensing and control requirements specific to a two terminal electric baseboard heating installation. 7 figs.

Stalsberg, K.J.; Ingalls, J.E.; Hoglund, S.R.

1995-10-10T23:59:59.000Z

262

Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08  

Science Conference Proceedings (OSTI)

Clearing C-trees along the south side of the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All work is to be done on the south side of centerline. Target vegetation is the tall growing Firs along the edge of the ROW, all of which is located within the back yards of the property owners along the right-of-way. The density of vegetation is low and consists of C-Trees located within backyards, with the branches growing towards the lines. Due to lack of access and past verbal agreements with the landowners, permission/agreement has been difficult to obtain from the property owners. Permission has now been obtained to remove the C-Trees within their back yards which, will soon be a hazard to our transmission line facility. We are working with the landowners to get them to plant low growing scrubs and ornamentals within the right-of-way and adjacent to the right-of-way. A follow up herbicide treatment is not planned because the trees being cut will not re-sprout. This right-of-way or project area is on a three to four year maintenance schedule. Little or no treatment should be required in the immediate future.

N /A

2001-04-23T23:59:59.000Z

263

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

264

Zigzag Survey Designs in Line Transect Sampling  

E-Print Network (OSTI)

survey lines are frequently used in shipboard and aerial line transect surveys of animal populations; Systematic designs; Zigzag designs. 1. INTRODUCTION Shipboard and aerial line transect surveys are widelyZigzag Survey Designs in Line Transect Sampling Samantha STRINDBERG and Stephen T. BUCKLAND Zigzag

Buckland, Steve

265

Beam line windows at LAMPF  

Science Conference Proceedings (OSTI)

The A-6 main beam-line window at LAMPF separates the vacuum of the main beam line from the isotope production station, proton irradiation ports, and the beam stop, which operate in air. This window must withstand the design beam current of 1 mA at 800 MeV for periods of at least 3000 hours without failure. The window is water cooled and must be strong enough to withstand the 2.1 MPa (300 psig) cooling water pressure, as well as beam-induced thermal stresses. Two designs have been used to meet these goals, a stepped-plate window and a hemispherical window, both made from a precipitation-hardened nickel base alloy, Alloy 718. Calculations of the temperatures and stresses in each of these windows are presented.

Brown, R.D.; Grisham, D.L.; Lambert, J.E.

1985-01-01T23:59:59.000Z

266

BOREAS Survey On-Line  

NLE Websites -- All DOE Office Websites (Extended Search)

FF33"> FF33"> BOREAS Survey On-Line To improve the BOREAS and BOREAS Follow-On data sets and to meet users' needs, we are conducting a survey. The BOREAS and BOREAS Follow-On data sets continue to be important products at the ORNL DAAC. To date we have provided over 8,000 data products from these projects to nearly 1,500 users. We invite you to fill out this survey, identifying any problems you had with the data and documentation or any difficulties you experienced in finding and acquiring the data sets. Information you provide will enable us to address problems that need attention. It will also help us determine which aspects of the BOREAS and BOREAS Follow-On information need to be expanded. You can complete the survey at the BOREAS Home Page. After you complete the on-line survey, submit your answers to the ORNL

267

Guide for Transmission Line Grounding  

Science Conference Proceedings (OSTI)

Electrical utilities have a duty to provide effective grounding for managing steady-state and fault currents, whether near a large generating station or at a remote distribution pole ground. For transmission lines, this imperative is usually met with investment in overhead ground wires and grounding electrodes. Effective grounding at each tower improves reliability8212by providing low path impedance to lightning strokes8212and contributes to safety. However, the fundamental physical parameters in ground ...

2007-12-20T23:59:59.000Z

268

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

Transmission and distribution infrastructures throughout the world are aging. As such, inspection, assessment, and maintenance of existing facilities have become increasingly important topics. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance program for transmission line wood structures to help utilities develop and refine individual maintenance programs. The report is part of a broader multi-year effort by EPRI to develop a comprehensive handb...

2006-09-28T23:59:59.000Z

269

In-Line Thermoelectric Module  

DOE Patents (OSTI)

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an-in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions maybe perpendicular to the direction-of current flow through the module.

Pento, Robert; Marks, James E.; Staffanson, Clifford D.

1998-07-28T23:59:59.000Z

270

In-line thermoelectric module  

DOE Patents (OSTI)

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions may be perpendicular to the direction of current flow through the module.

Pento, Robert (Algonquin, IL); Marks, James E. (Glenville, NY); Staffanson, Clifford D. (S. Glens Falls, NY)

2000-01-01T23:59:59.000Z

271

Tropical Squall Lines of the Arizona Monsoon  

Science Conference Proceedings (OSTI)

Squall lines possessing nearly all the characteristics of tropical squall lines occasionally develop during the summer monsoon over southern Arizona and northwestern Mexico. Initial thunderstorm formation is over the Continental Divide in the ...

Walter P. Smith; Robert L. Gall

1989-07-01T23:59:59.000Z

272

Squall-Line Intensification via Hydrometeor Recirculation  

Science Conference Proceedings (OSTI)

Many studies have demonstrated the intimate connection between microphysics and deep moist convection, especially for squall lines via cold pool pathways. The present study examines four numerically simulated idealized squall lines using the ...

Robert B. Seigel; Susan C. van den Heever

2013-07-01T23:59:59.000Z

273

A Computer Package for Transmission Line Analysis  

Science Conference Proceedings (OSTI)

A computer program, LIGNE, has been developed as a comprehensive teaching aid for the section on transmission line theory in an electromagnetics course. The program assists the student in the analysis of transmission lines, enabling him to quickly assess ...

Georges-Andre Chaudron; Manfred Nachman

1987-11-01T23:59:59.000Z

274

Potential Vorticity Anomalies Associated with Squall Lines  

Science Conference Proceedings (OSTI)

This study involves observations and model simulations of potential vorticity anomalies in the wake of midlatitude squall lines. Using data from the Oklahoma–Kansas PRE-STORM experiment, we analyze potential vorticity fields near two squall lines—...

Rolf F. A. Hertenstein; Wayne H. Schubert

1991-07-01T23:59:59.000Z

275

Methods of Using Existing Wire Lines (power lines, phone lines, internet lines) for Totally Secure Classical Communication Utilizing Kirchoff's Law and Johnson-like Noise  

E-Print Network (OSTI)

We outline some general solutions to use already existing and currently used wire lines, such as power lines, phone lines, internet lines, etc, for the unconditionally secure communication method based on Kirchoff's Law and Johnson-like Noise (KLJN). Two different methods are shown. One is based on filters used at single wires and the other one utilizes a common mode voltage superimposed on a three-phase powerline.

Laszlo B. Kish

2006-10-02T23:59:59.000Z

276

Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization  

DOE Patents (OSTI)

Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes.

Jankowiak, Ryszard J. (Ames, IA); Small, Gerald J. (Ames, IA); Shields, Peter A. (Reading, MA)

1999-04-27T23:59:59.000Z

277

Practical pairwise testing for software product lines  

Science Conference Proceedings (OSTI)

One key challenge for software product lines is efficiently managing variability throughout their lifecycle. In this paper, we address the problem of variability in software product lines testing. We (1) identify a set of issues that must be addressed ... Keywords: feature modelling, software product lines, variability management

Dusica Marijan, Arnaud Gotlieb, Sagar Sen, Aymeric Hervieu

2013-08-01T23:59:59.000Z

278

Visualizing DIII-D Tokamak magnetic field lines  

Science Conference Proceedings (OSTI)

Keywords: graphics hardware, haloed lines, illuminated lines, interactive visualization, magentic field, plasma physics, tokamak

Greg Schussman; Kwan-Liu Ma; David Schissel; Todd Evans

2000-10-01T23:59:59.000Z

279

Microsoft Word - UEC_LURR20130062_CX  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandra Billings - TERR-FRANKLIN Sandra Billings - TERR-FRANKLIN Project Manager Proposed Action: Umatilla Electric Cooperative (UEC) use of right-of-way south of McNary Substation Land Use Review Request Case No.: 20130062 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple Use of Powerline Rights-of-Way Location: Umatilla, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow UEC to use 0.7 miles of BPA fee-owned right-of-way to construct a portion of a 3-mile, double-circuit 115-kV transmission line. The area has been previously disturbed by the construction of transmission lines and other utilities. UEC's proposed line would cross eight BPA transmission lines ranging in voltage from

280

(DOE/EIS-0285/SA 108): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Satsop-Aberdeen #2 9/5/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 8, Satsop-Aberdeen #2. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5 (reference line). Other lines which are present in the proposed corridor are the Satsop-Aberdeen #3 230 kV, South Elma-Cosmopolis 115kV, and Aberdeen tap to South Elma-Cosmospolis 115kV. Right of way width averages 238 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Neutron Drip-Line Topography  

Science Conference Proceedings (OSTI)

The development of microscopic mass models is a crucial ingredient for the understanding of how most of the elements of our world were fabricated. Confidence in drip-line predictions of such models requires their comparison with new mass data for nuclides far from stability. We combine theory and experiment using results that are state of the art: the latest mass measurements from the Penning-trap spectrometer ISOLTRAP at CERN-ISOLDE are used to confront the predictions of the latest Skyrme-Hartree-Fock-Bogoliubov (HFB) microscopic mass models. In addition, we compare the new data to predictions of other types of mass models and the extrapolative behavior of the various models is analyzed to highlight topographical trends along the shores of the nuclear chart.

Ramirez, E. Minaya; Audi, G.; Lunney, D.; Naimi, S. [Centre de Spectrometrie Nucleaire et de Spectrometrie de Masse, Universite Paris Sud, Orsay (France); Beck, D.; Herfurth, F. [GSI Helmholtzzentrum fuer Schwerionenforschung, Darmstadt (Germany); Blaum, K.; Borgmann, C.; George, S.; Kellerbauer, A. [Max-Planck-Institut fuer Kernphysik, Heidelberg (Germany); Boehm, Ch.; Neidherr, D. [Institut fuer Physik, Johannes-Gutenberg-Universitaet, Mainz (Germany); Breitenfeldt, M.; Rosenbusch, M.; Schweikhard, L. [Institut fuer Physik, Ernst-Moritz-Arndt-Universitaet, Greifswald (Germany); Chamel, N.; Goriely, S. [Institut d'Astronomie et d'Astrophysique, Universite Libre de Bruxelles (Belgium); Herlert, A.; Kowalska, M. [Physics Department, Centre European de Recherche Nucleaire, Geneva (Switzerland); Pearson, J. M. [Department of Physics, Universite de Montreal, Montreal, Quebec (Canada)] (and others)

2009-08-26T23:59:59.000Z

282

Gamma-Ray Burst Lines  

E-Print Network (OSTI)

The evidence for spectral features in gamma-ray bursts is summarized. As a guide for evaluating the evidence, the properties of gamma-ray detectors and the methods of analyzing gamma-ray spectra are reviewed. In the 1980's, observations indicated that absorption features below 100 keV were present in a large fraction of bright gamma-ray bursts. There were also reports of emission features around 400 keV. During the 1990's the situation has become much less clear. A small fraction of bursts observed with BATSE have statistically significant low-energy features, but the reality of the features is suspect because in several cases the data of the BATSE detectors appear to be inconsistent. Furthermore, most of the possible features appear in emission rather than the expected absorption. Analysis of data from other instruments has either not been finalized or has not detected lines.

Michael S. Briggs

1999-10-20T23:59:59.000Z

283

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

284

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

285

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

286

Power Line Calculator for DOS  

Science Conference Proceedings (OSTI)

The Power Line Calculator (PLC) for DOS, version 1.0, is a program that describes the electrical characteristics of a transmission or distribution system given user-defined input. This input may consist of a combination of operating currents and phases, symmetric components, power factor, and real or reactive power. The program also allows the user to designate whether currents are present on the system neutral or in the ground. The PLC assumes that any value entered by the user remains fixed (e.g., phase current, power factor), and for underdetermined systems, basic default assumptions are incorporated: the power factor is held at or near 1.0, the net phase current is kept at or near zero, and the phase conductor currents are kept balanced. The program operates under PC/MS-DOS version 3.3 or later, and the output is available in both tabular and graphic formats.

Silva, J.M. (Enertech Consultants, Campbell, CA (United States))

1992-11-01T23:59:59.000Z

287

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

1987-05-19T23:59:59.000Z

288

On-line transformer monitoring  

Science Conference Proceedings (OSTI)

There are presently many different approaches to transformer monitoring, either on the market or under development. There are also, many different opinions about how on-line monitoring should be accomplished. On the one hand, efforts are being made to develop expert systems that monitor all transformer parameters and generate an estimate of overall transformer condition. On the other hand, a large number of transformer monitors, designed to monitor one or two specific parameters are already on the market. Another important factor to consider in choosing a monitor is who receives the information and how it is transmitted. The ultimate transformer monitor should feed into the supervisory control and data acquisition (Scada) system. This paper discusses the various aspects of this issue including asset protection, cost control, dissolved gases, pinpointing bad bushings and current transformers, hot spot measurement partial discharge, and water-in-oil measurements. 10 figs.

NONE

1995-10-01T23:59:59.000Z

289

Separation of magnetic field lines  

SciTech Connect

The field lines of magnetic fields that depend on three spatial coordinates are shown to have a fundamentally different behavior from those that depend on two coordinates. Unlike two-coordinate cases, a flux tube in a magnetic field that depends on all three spatial coordinates that has a circular cross section at one location along the tube characteristically has a highly distorted cross section at other locations. In an ideal evolution of a magnetic field, the current densities typically increase. Crudely stated, if the current densities increase by a factor {sigma}, the ratio of the long to the short distance across a cross section of a flux tube characteristically increases by e{sup 2{sigma}}, and the ratio of the longer distance to the initial radius increases as e{sup {sigma}}. Electron inertia prevents a plasma from isolating two magnetic field structures on a distance scale shorter than c/{omega}{sub pe}, which is about 10 cm in the solar corona, and reconnection must be triggered if {sigma} becomes sufficiently large. The radius of the sun, R{sub Circled-Dot-Operator }=7 Multiplication-Sign 10{sup 10}cm is about e{sup 23} times larger, so when {sigma} Greater-Than-Or-Equivalent-To 23, two lines separated by c/{omega}{sub pe} at one location can be separated by the full scale of any magnetic structures in the corona at another. The conditions for achieving a large exponentiation, {sigma}, are derived, and the importance of exponentiation is discussed.

Boozer, Allen H. [Department of Applied Physics and Applied Mathematics, Columbia University, New York, New York 10027 (United States)

2012-11-15T23:59:59.000Z

290

Marine surveys aid gas line  

Science Conference Proceedings (OSTI)

Detailed marine surveys helped B.C. Hydro, a Canadian gas distribution utility, select the submarine route portion of the proposed Vancouver Island gas pipeline system. In 1984, after a series of government hearings, B.C. Hydro's route selection was adopted by the British Columbia Provincial Government. Vancouver Island is the last major population center in Western Canada not supplied with natural gas. In fact, studies of a gas pipeline to the island have been carried out periodically over the past 30 years. But until recently, all schemes have appeared unattractive because of a combination of technical, economic, and political factors. The proposed Vancouver Island project which is awaiting funding, consists of a dual 52.7-km marine transmission pipeline link from the mainland to the island. Diameter of this portion of line will be either 12 of 16-in. Also, part of the proposed system will be an 18.5-km line on the mainland, a 280-km transmission pipeline on the island, compression facilities, and distribution systems in the major population centers. Diameters for the land portions will vary between 6 and 24 in. For several months in late 1983 and early 1984, the project was the subject of public hearings held by the British Columbia Utilities Commission. This process was complicated when two companies applied to construct and operate the marine pipeline link to the island using completely different routes and techniques. In July 1984, the commission recommended to the Provincial Government that B.C. Hydro's proposal for the marine pipeline be accepted. It further recommended that an Energy Project Certificate for construction of the pipeline link to the island be awarded to B.C. Hydro. The recommendation was accepted by the Provincial Government and the project now awaits a funding agreement between the Federal and Provincial Governments.

Park, C.A.; Baines, F.A. Koenig, H.L.

1986-05-05T23:59:59.000Z

291

Computing criticality of lines in power systems  

E-Print Network (OSTI)

Abstract — We propose a computationally efficient method based on nonlinear optimization to identify critical lines, failure of which can cause severe blackouts. Our method computes criticality measure for all lines at a time, as opposed to detecting a single vulnerability, providing a global view of the system. This information on criticality of lines can be used to identify multiple contingencies by selectively exploring multiple combinations of broken lines. The effectiveness of our method is demonstrated on the IEEE 30 and 118 bus systems, where we can very quickly detect the most critical lines in the system and identify severe multiple contingencies. I.

Ali P?nar; Adam Reichert; Bernard Lesieutre

2007-01-01T23:59:59.000Z

292

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

293

Line Extension Alternatives | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Line Extension Alternatives Line Extension Alternatives Line Extension Alternatives < Back Eligibility Utility Savings Category Energy Sources Buying & Making Electricity Solar Wind Program Info State Vermont Program Type Line Extension Analysis Provider Vermont Department of Public Service The Public Service Board (PSB) of Vermont developed rules regarding utility line extension requests. While the majority of the rules focus on the procedure followed (and associated fees) for the actual line extensions, the PSB also included a provision that requires the electric utilities to provide written information to customers about off-grid electricity generators as an alternative to line extensions. The PSB recognized that in many cases off-grid electricity generators are less expensive than

294

Line Extension Analysis | Open Energy Information  

Open Energy Info (EERE)

Line Extension Analysis Line Extension Analysis Jump to: navigation, search When a prospective electric customer requests service for a home or facility that is not currently serviced by the electric grid, the customer usually must pay a distance-based fee for the cost of extending power lines to the home or facility. In many cases, it is cheaper to use an on-site renewable energy system to meet a prospective customerÂ’s electricity needs. Certain states require utilities to provide information regarding renewable energy options when prospective customers request a line extension. [1] Line Extension Analysis Incentives CSV (rows 1 - 12) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Authorization of Line Extension (Nebraska) Line Extension Analysis Nebraska Agricultural

295

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

296

(DOE/EIS-0285-SA-115): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Shelton-Fairmount # 1-4 12/20/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 0, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 115, Shelton- Fairmount # 1-4. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2 (reference line ADNO 8354). Right of way width averages 258 feet. Location: The project area is located in Jefferson County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and

297

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Categorical Exclusion for erosion repair and cactus relocation along the existing Tucson-Apache 11S-kV transmission line in Pima County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to construct a new access road along the existing Tucson-Apache 11S-kV transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-2S/2 & 2S/3- 26/S. We will be installing two gates to limit right-of-way access from Houghton Road. We will be creating reinforced embankments through the placement of

298

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

299

EIS-0285-SA-13: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening

300

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Single transmission line data acquisition system  

DOE Patents (OSTI)

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

302

NSLS-II Transport Line Progress  

SciTech Connect

The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

Fliller R. P.; Wahl, W.; Anderson, A.; Benish, B.; DeBoer, W.; Ganetis, G.; Heese, R.; Hseuh, H.-C.; Hu, J.-P.; Johanson, M.P.; Kosciuk, B.N.; Padrazo, D.; Roy, K.; Shaftan, T.; Singh, O.; Tuozzolo, J.; Wang, G.

2012-05-20T23:59:59.000Z

303

Magnetic Materials for Broadband Transmission Line  

E-Print Network (OSTI)

The author’s series of articles on broadband transmission line transformers (TLTs) concludes with these notes on magnetic materials and the properties that are important for best performance Ferrite and iron powder magnetic materials were developed to support a wide range of components, including inductors, EMI suppressors, conventional transformers and transmission line transformers (TLTs). This article deals with transmission line transformers, presenting the observations and conclusions of the author, reached after extensive experimental research into the behavior and performance of these devices in broadband applications. Figure 1 · The three transformers used in comparing the performance of the autotransformer and the transmission line transformer. At the top left is an autotransformer; at the top right is the transmission line transformer, while at the bottom is a transmission line transformer without a ferrite core. All transformers had a total of 10 turns.

Jerry Sevick

2005-01-01T23:59:59.000Z

304

Evaluation of Emerging Line Inspection Technologies  

Science Conference Proceedings (OSTI)

This report describes field tests to examine various technologies available to establish conductor temperature during lidar field surveys of existing transmission lines. This is critical to assembling a proper line model to determine accurate sags and clearances. Lidar surveys are intended to demonstrate whether transmission lines have required clearances under full rating and specified environmental conditions. Typically, the technique used to establish conductor temperature at the ...

2012-11-28T23:59:59.000Z

305

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

High-voltage direct current (HVDC) transmission lines are used to transmit large amounts of power over long distances. The Electric Power Research Institute (EPRI) and others have produced many publications over approximately the past three decades, expounding on this topic. Several HVDC transmission lines have been built and have been in operation around the world over that period, and recently, there has been increased interest in the advantages that HVDC transmission affords. HVDC lines, like high-vol...

2010-12-23T23:59:59.000Z

306

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

307

20120131 DOE Congestion Study Clean Line Comments 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Line is an independent developer of four long-haul, high voltage direct current ("HVDC") transmission lines across the United States. Clean Line focuses exclusively on connecting...

308

Point-line spaces related to Jordan pairs.  

E-Print Network (OSTI)

??A point-line space is an abstract geometric object that consists of a set of points and a set of lines such that on each line… (more)

Huggenberger, Simon

2009-01-01T23:59:59.000Z

309

Fermilab | Take Five for Goal Zero | Gloves | Lined Leather Gloves  

NLE Websites -- All DOE Office Websites (Extended Search)

Lined Leather Gloves Lined Leather Gloves Description Color Finish Uses FNAL Stock Number Fleece lined for warmth Keystone Thumb Shirred Elastic Back Color coded cuff indicates...

310

NIST: Atomic Spectros. - Spectral Line Shapes, etc.  

Science Conference Proceedings (OSTI)

... For a Maxwellian velocity distribution, the line shape is Gaussian; the full width at ... Shapes are often approximately Lorentzian, ie, I(?) ? {1 + [(? - ? 0 ...

311

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

312

Northern Pass Transmission Line Project Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September...

313

Emergency Management Lines of Inquiry, April 2008  

NLE Websites -- All DOE Office Websites (Extended Search)

3, 2008 EMERGENCY MANAGEMENT Inspection Criteria, Activities, and Lines of Inquiry Functional Area: Hazards Survey (HS) and Emergency Planning Hazards Assessment (EPHA) Inspection...

314

Gila to North Gila Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Western proposes to rebuild and upgrade two, parallel, 4.8-mile-long transmission lines located between Gila and North Gila Substations and take land actions...

315

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

316

Nonthermal effects on hydrogen-line profiles  

DOE Green Energy (OSTI)

Experimentally determined level populations of hydrogen excited states from a low-density Z pinch are used as initial conditions in a simulation to derive electron-velocity distributions. These velocity distributions show excess electrons in the high velocity end of the distribution when compared to a Maxwellian velocity distribution. The non-Maxwellian velocity distributions are used to find the nonequilibrium structure factors which are a main component in the plasma line broadening of hydrogen lines. The line profiles generated using the structure factors show plasmon satellites on the wings of the Balmer-..cap alpha..- and -..beta..-line profiles.

Lee, R.W.; Morgan, W.L.

1985-07-01T23:59:59.000Z

317

Line Heat-Source Guarded Hot Plate  

Science Conference Proceedings (OSTI)

Line Heat-Source Guarded Hot Plate. Description: The 1-meter guarded hot-plate apparatus measures thermal conductivity of building insulation. ...

2012-03-06T23:59:59.000Z

318

Emergency Management Lines of Inquiry, April 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2008 EMERGENCY MANAGEMENT Inspection Criteria, Activities, and Lines of Inquiry Functional Area: Hazards Survey (HS) and Emergency Planning Hazards Assessment (EPHA) Inspection...

319

Effects of line shifts and the ion quadrupole contribution of spectral line asymmetries.  

SciTech Connect

Line asymmetries and the corresponding shift of spectral lines due to the electron penetration of the radiator orbitals and the ion quadrupole contribution become more significant with increasing principal quantum number and increasing electron density. The mean field static shift due to electron penetration of the orbitals gives rise to an overall shift of the line to lower energy and a significant asymmetry near line center, but does not generate much redhlue far wing asymmetry. The ion quadrupole contribution results in a small blue shift of the spectral line and a small change in asymmetry near line center, but it gives rise to a significant redhlue wing asymmetry in the far wings of the line. Experimental data fiom recent spherical implosion experiments on OMEGA shows evidence of the mean field static shift and may also show the effects of level interactions between the Ar Lyman -{gamma}, -{delta}, -{var_epsilon} lines and also the Ar He -{gamma}, -{delta} lines.

Gunderson, M. A. (Mark A.); Delamater, N. D. (Norman D.); Kilcrease, D. P. (David P.); Haynes, D. A. (Donald A.)

2002-01-01T23:59:59.000Z

320

Theoretical Atomic Physics code development IV: LINES, A code for computing atomic line spectra  

SciTech Connect

A new computer program, LINES, has been developed for simulating atomic line emission and absorption spectra using the accurate fine structure energy levels and transition strengths calculated by the (CATS) Cowan Atomic Structure code. Population distributions for the ion stages are obtained in LINES by using the Local Thermodynamic Equilibrium (LTE) model. LINES is also useful for displaying the pertinent atomic data generated by CATS. This report describes the use of LINES. Both CATS and LINES are part of the Theoretical Atomic PhysicS (TAPS) code development effort at Los Alamos. 11 refs., 9 figs., 1 tab.

Abdallah, J. Jr.; Clark, R.E.H.

1988-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

The Swinburne on-line education project  

Science Conference Proceedings (OSTI)

Many universities throughout the world are exploring the possibilities of on-line delivery of educational programs. These developments have the potential to significantly change the face of higher education as we know it today. In order to compete in ... Keywords: WWW, on-line education

C. J. Pilgrim; M. J. Creek

1998-08-01T23:59:59.000Z

322

results and benefits... The Bittern Line Carbon  

E-Print Network (OSTI)

results and benefits... The Bittern Line Carbon Neutral Stations Transport Regeneration Ltd. June 2008 c a s e s t u d yCRed carbon reduction Project Summary Our client, Transport Regeneration Ltd., aims to make nine stations on the Bittern Line between Norwich and Sheringham carbon neutral

Everest, Graham R

323

Requirements Uncertainty in a Software Product Line  

Science Conference Proceedings (OSTI)

A complex system's requirements almost always remain uncertain late into its software development. In gas turbine engine control systems at Rolls-Royce, for a traditional project (non-product line) typically 50% of requirements will change between Critical ... Keywords: Requirements, Uncertainty, Software Product Lines

Andy J. Nolan; Silvia Abrahao; Paul C. Clements; Andy Pickard

2011-08-01T23:59:59.000Z

324

Product Line Pricing in a Supply Chain  

Science Conference Proceedings (OSTI)

A vertically integrated channel would prefer to coordinate the pricing of its products. In this paper, we investigate drivers of product line pricing decisions in a bilateral monopoly where a manufacturer produces and sells two substitutable or complementary ... Keywords: complement, equilibrium, marketing, product line pricing, substitute, vertical strategic interaction

Lingxiu Dong; Chakravarthi Narasimhan; Kaijie Zhu

2009-10-01T23:59:59.000Z

325

Transmission line protection based on travelling waves  

Science Conference Proceedings (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

326

Base line estimation using sparse nonlinear operators  

Science Conference Proceedings (OSTI)

Efficient nonlinear operators for base line estimation of high energy physics detector signals are introduced. Due to the high processing rate requirements the operators are simplified using sparse input sequences. The operators are a sparse order statistic ... Keywords: base line estimation, filter training, order statistic filter

Sami J. Inkinen; Yrjö Neuvo

2002-05-01T23:59:59.000Z

327

Overhead Line Worker Practices Survey: 2012  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has undertaken a multiyear research project to identify and describe leading industry overhead line worker practices. This effort is intended to identify and document industry overhead distribution line work practices of note, identify shortterm products (such as practices guidelines) that EPRI can ...

2012-08-23T23:59:59.000Z

328

Separation axioms and the fuzzy real lines  

Science Conference Proceedings (OSTI)

We show that for each lattice L which is completely distributive and equipped with an order-reversing involution, the canonical topology of the fuzzy real line @?(L) is uniformizable in the sense of Hutton; furthermore, this uniformity induces a pseudometric ... Keywords: ?-Hausdorff, Fuzzy subspace, Fuzzy topology, Product L-fuzzy real line, Pseudometrizable, Quasi-uniformity, Suitable, Uniformity

S. E. Rodabaugh

1983-01-01T23:59:59.000Z

329

Accelerating line extraction based on GPU  

Science Conference Proceedings (OSTI)

A new line extraction accelerating algorithm based upon graphics processing units (GPUs) is presented. Several techniques are proposed to optimize the GPU computation. Among those improvements, the most important one is the use of "seed pixels", which ... Keywords: GPU, line extraction, parallel processing, phase-based grouping

Li Yu; Xiao'an Tang; Bo Tang

2011-12-01T23:59:59.000Z

330

A Fast Line-by-Line Method for Atmospheric Absorption Computations: The Automatized Atmospheric Absorption Atlas  

Science Conference Proceedings (OSTI)

A computationally fast line-by-line method for the determination of atmospheric absorption is described. This method is based on the creation of an Automatized Atmospheric Absorption Atlas (4A) covering all possible plausible atmospheric ...

N. A. Scott; A. Chedin

1981-07-01T23:59:59.000Z

331

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation...

332

Coupled Lines/Multiport Measurement/Orthogonal Calibration  

Science Conference Proceedings (OSTI)

... understanding of lossy multiconductor transmission lines and modal cross powers. These theoretical developments in coupled line theory have led ...

2012-05-25T23:59:59.000Z

333

Kangley - Echo Lake Transmission Line Project, Final Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selleck Kangley North Bend Cedar Falls Existing Transmission Lines Proposed Transmission Line Alternatives Under Consideration BPA Substation Alternative * * * * * * ...

334

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

335

EIS-0285-SA-133: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Supplement Analysis 3: Supplement Analysis EIS-0285-SA-133: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, and around tower structures along the subject transmission line corridors. Approximately 20 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Access roads and tower sites will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line

336

(DOE/EIS-0285/SA 107): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Elma-Cosmopolis #1 9/5/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 7, Elma-Cosmopolis #1. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elma-Cosmopolis #1 115kV transmission line corridor from structure 11/7 through structure 20/3. Right of way width averages 100 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridors. Approximately 8 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 2.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites

337

LineScout technology: from inspection to robotic maintenance on live transmission power lines  

Science Conference Proceedings (OSTI)

Power line inspection and maintenance practices are evolving as changing market regulations, significantly increased line loading and system availability requirements put pressure on grid owners to innovate. Robotics is thus making its debut in that ... Keywords: field robotics, mechanical design, power line inspection robot, telerobotics

Nicolas Pouliot; Serge Montambault

2009-05-01T23:59:59.000Z

338

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

339

Productivity Improvement of a Manual Assembly Line  

E-Print Network (OSTI)

The current project addresses the productivity improvement of a manual assembly line by making use of operations analysis in the framework of Lean production. A methodology is proposed that helps to improve the productivity of any production process. The methodology consists of selecting a product or product family to be studied followed by current process study. Once the existing process is documented, all the assembly tasks involved must be timed using time study techniques. Operations analysis enables the reduction of non-productive tasks and results in a set of standardized work elements along with the set of standard procedures for performing the operations. Assembly line balancing along with the associated operations analysis assists in constructing or re-configuring an assembly system, which is the key step in improving the overall performance of an assembly line. Following this approach, two manual assembly line configurations (single stage parallel line and five-stage serial line) are constructed for a case study. The results show that by changing over to the single stage assembly line configuration the operator productivity is doubled when compared to the existing assembly method.

Yerasi, Pranavi

2011-08-01T23:59:59.000Z

340

Definition: Tie Line | Open Energy Information  

Open Energy Info (EERE)

Authority Area, smart grid References Glossary of Terms Used in Reliability Standards An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Definition: Tie Line Bias | Open Energy Information  

Open Energy Info (EERE)

Line Bias Line Bias Jump to: navigation, search Dictionary.png Tie Line Bias A mode of Automatic Generation Control that allows the Balancing Authority to maintain its Interchange Schedule and respond to Interconnection frequency error.[1] Related Terms Balancing Authority, Automatic Generation Control, frequency error, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Tie_Line_Bias&oldid=502569" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

342

Insulate Steam Distribution and Condensate Return Lines  

Science Conference Proceedings (OSTI)

This revised ITP tip sheet on insulating steam distribution and condensate return lines provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

343

On the Generation of African Squall Lines  

Science Conference Proceedings (OSTI)

Squall lines (SLs) form an important component of the meteorology of northern Africa, and in particular, contribute substantially to rainfall totals. Their generation requires the existence of a potentially unstable low-level supply of moisture ...

David P. Rowell; James R. Milford

1993-06-01T23:59:59.000Z

344

Clean Lines: Strategies for Reducing Your Environmental ...  

Science Conference Proceedings (OSTI)

... Flow restrictors to prevent the flow in a water-supply pipe from exceeding a ... On manual lines, racks can be hung on bars over process baths to allow ...

2013-08-16T23:59:59.000Z

345

Momentum Transport by a Line of Cumulonimbus  

Science Conference Proceedings (OSTI)

The vertical transport of horizontal momentum normal to a line of cumulonimbus observed during GATE on 14 September 1974 is against the vertical momentum gradient, contrary to the predictions of mixing-length theory. Data from repeated aircraft ...

Margaret A. LeMone

1983-07-01T23:59:59.000Z

346

Mesoscale Structure of an Oklahoma Squall Line  

Science Conference Proceedings (OSTI)

A squall line, which passed through the National Severe Storms Laboratory measonetwork in Oklahoma on 26 April 1969, is analyzed to determine the mesoscale structure. The analyses are based on data from 23 rawinsonde ascents, 29 automatically ...

Judith Stokes Bradberry

1981-05-01T23:59:59.000Z

347

Corona losses in HVdc bipolar lines  

SciTech Connect

The problem related to the prediction of corona losses in HVdc bipolar lines has been solved, in the past, by means of semi-empirical monomial formulae. However, the proposed formulae that are simpler to use do not always give adequate calculation precision, while the formulae that provide the closest results require implicit functions of different complexity, which are difficult to apply; moreover, it is not possible to understand clearly what influence the variations of the different line parameters have on the losses themselves. The new monomial semi-empirical relationship, proposed to predict the corona losses in HVdc bipolar lines, is very simple to use; it highlights the dependence of power losses due to the corona effect by the different line parameters. The formula has been developed by elaborating a considerable amount of available experimental data.

Corbellini, U.; Pelacchi, P. [Univ. of Pisa (Italy). Dept. of Electric Systems and Automation

1996-07-01T23:59:59.000Z

348

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

349

Electrical Characterization of Textile Transmission Lines  

E-Print Network (OSTI)

In this paper, electrical characterization and modeling of conductive textiles are presented. A dedicated measurement setup has been developed to allow reliable connection of the textile samples with the equipment cables. Geometrical fabric structures and fabrication tolerances as well as high frequency properties up to 6 GHz for four types of textiles have been determined. Transmission lines with controlled characteristic impedance have been realized enabling the characterization of typical line attenuation factors. This work shows that textile transmission lines can be used for frequencies up to 1.2 GHz and 120 MHz with the maximal lengths of 10 and 100 cm, respectively. Index Terms---Attenuation constants, characteristic impedance, conductive textiles, transmission lines, wearable computing.

Didier Cottet; Janusz Grzyb; Student Member; Student Member; Tünde Kirstein; Gerhard Tröster; Senior Member

2003-01-01T23:59:59.000Z

350

On-line Condenser Fouling Monitor Development  

Science Conference Proceedings (OSTI)

This newly developed, innovative, on-line fouling monitor can continuously display the cleanliness factor of an operating condenser. The monitor facilitates optimization of cooling water treatment and condenser cleaning schedules.

1998-03-17T23:59:59.000Z

351

Claw-free graphs and line graphs.  

E-Print Network (OSTI)

??The research of my dissertation is motivated by the conjecture ofThomassen that every 4-connected line graph is hamiltonian and by the conjecture ofTutte that every… (more)

Shao, Yehong, 1976-

2005-01-01T23:59:59.000Z

352

Power line communications for smart grid applications  

Science Conference Proceedings (OSTI)

Power line communication, that is, using the electricity infrastructure for data transmission, is experiencing a renaissance in the context of Smart Grid. Smart Grid objectives include the integration of intermittent renewable energy sources into the ...

Lars Torsten Berger, Andreas Schwager, J. Joaquín Escudero-Garzás

2013-01-01T23:59:59.000Z

353

Design of the ILC RTML Extraction Lines  

SciTech Connect

The ILC [1] Damping Ring to the Main Linac beamline (RTML) contains three extraction lines (EL). Each EL can be used both for an emergency abort dumping of the beam and tune-up continual train-by-train extraction. Two of the extraction lines are located downstream of the first and second stages of the RTML bunch compressor, and must accept both compressed and uncompressed beam with energy spreads of 2.5% and 0.15%, respectively. In this paper we report on an optics design that allowed minimizing the length of the extraction lines while offsetting the beam dumps from the main line by the distance required for acceptable radiation levels in the service tunnel. The proposed extraction lines can accommodate beams with different energy spreads while at the same time providing the beam size acceptable for the aluminum dump window. The RTML incorporates three extraction lines, which can be used for either an emergency beam abort or for a train-by-train extraction. The first EL is located downstream of the Damping Ring extraction arc. The other two extraction lines are located downstream of each stage of the two-stage bunch compressor. The first extraction line (EL1) receives 5GeV beam with an 0.15% energy spread. The extraction line located downstream of the first stage of bunch compressor (ELBC1) receives both compressed and uncompressed beam, and therefore must accept beam with both 5 and 4.88GeV energy, and 0.15% and 2.5% energy spread, respectively. The extraction line located after the second stage of the bunch compressor (ELBC2) receives 15GeV beam with either 0.15 or 1.8% energy spread. Each of the three extraction lines is equipped with the 220kW aluminum ball dump, which corresponds to the power of the continuously dumped beam with 5GeV energy, i.e., the beam trains must be delivered to the ELBC2 dump at reduced repetition rate.

Seletskiy, S.; Tenenbaum, P.; Walz, D.; /SLAC; Solyak, N.; /Fermilab

2011-10-17T23:59:59.000Z

354

Honeybees and Power Line EMF Environments  

Science Conference Proceedings (OSTI)

This Resource Paper reviews research relevant to potential interactions between electric and magnetic field environments in the vicinity of high voltage overhead transmission lines. The paper deals first, with a description of a series of electric field studies conducted in a power line environment followed by mechanism studies under controlled conditions; second, with studies of the ability of bees to discriminate static and alternating magnetic fields; and third, with a study of native bees in a power ...

2010-12-06T23:59:59.000Z

355

Electrical Effects of HVDC Transmission Lines--2012  

Science Conference Proceedings (OSTI)

Electrical effects may constrain the design of prospective high-voltage direct current (HVDC) lines, when either alone or sharing the same structures with high-voltage alternating current (HVAC) lines. In 2012, the Electric Power Research Institute (EPRI) research focused on electric field and ion density at ground level. The ultimate goal is to calculate with confidence these electrical effects. The work built on research previously performed, including pioneering research performed at EPRI’s ...

2012-12-12T23:59:59.000Z

356

500-kV Transmission Line Design  

Science Conference Proceedings (OSTI)

The design of an extrahigh-voltage (EHV) transmission line involves an integrated analysis and comparison of influencing factors to develop a structure configuration and conductor/shieldwire system that will provide safe, reliable, and economic service. Many of the parameters in design have varied impacts on the performance characteristics of a transmission line: safety, reliability, capital cost, and lifetime cost. The interdependencies are many and technical in nature. Having a solid knowledge of the p...

2011-02-04T23:59:59.000Z

357

Perspective: Power Lines and Motor Vehicle Electronics  

Science Conference Proceedings (OSTI)

Recent news reports have suggested that the operation of automotive electronic systems (including sudden acceleration) could be affected by the electric and magnetic fields associated with power transmission lines. Based on electromagnetic fundamentals and knowledge of the levels of electric fields, magnetic fields and RF fields from transmission lines, one can evaluate the possibility of an interaction between these exposures and the electronic systems within automobiles, both electric and conventional.

2010-06-06T23:59:59.000Z

358

CX-006818: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18: Categorical Exclusion Determination 18: Categorical Exclusion Determination CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by New Cingular Wireless. New Cingular Wireless proposes to place a 140 foot long, 4 inch underground conduit from its existing wireless communications facility to an existing BPA utility pole located in a BPA right-of-way. A proposed vault for fiber, 3 feet 1 inch by 6 feet 7 inches, would be placed just outside the fenced area of the substation. The area has been previously disturbed. Document(s) Available for Download

359

Dissolution of FB-Line Cabinet Sweepings  

DOE Green Energy (OSTI)

Three FB-Line samples were received by the Savannah River National Laboratory (SRNL) for characterization and evaluation for suitability for HB-Line dissolution. These samples are part of a larger sampling/evaluation program in support of FB-Line deinventory efforts. The samples studied were identified as MC04-147- HBL, MC04-148-HBL, and FBL-SWP-04-016-HBL (N). The first sample, MC04-147-HBL, is a portion of FB-Line Packaging and Stabilization (P&S) materials. The second sample, MC04-148-HBL, is a sweeping from Cabinet 6-8, which is not representative of the mechanical line. The third sample, FBL-SWP-04-016-HBL (N), is an FB-Line North cabinet sweeping. The samples were described by FB-Line personnel as containing plutonium oxide (PuO{sub 2}) which had not been high-fired. This description was generally confirmed by solids analysis and off gas measurements. All three samples were dissolved in 8 M HNO{sub 3}/0.1 M KF at 90-100 C leaving minor amounts of solid residue. During dissolution, sample MC04-147 did not generate hydrogen gas. Sample MC04-148 generated modest amounts of gas, which contained 4.0 to 4.7 volume percent (vol %) hydrogen (H{sub 2}) at a ratio of up to 8.4 x 10{sup -5} mol H{sub 2}/g sample. Sample FBL-SWP-04-016-HBL (N) was nearly completely soluble in 8 M HNO{sub 3}and produced a very small amount of gas. Apparently, the CaF{sub 2} in that sample dissolves and provides sufficient fluoride to support the dissolution of other components.

Crowder, Mark L.

2005-06-14T23:59:59.000Z

360

Relationship between System Slope and Updraft Intensity in Squall Lines  

Science Conference Proceedings (OSTI)

In recent years there has been debate about whether squall lines have an “optimal state.” It has been repeatedly demonstrated that the slope of a squall line’s convective region is related to the comparative magnitudes of the squall line’s cold ...

Matthew D. Parker

2010-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Modeling and analysis of electrical power lines for broadband power line communications.  

E-Print Network (OSTI)

??This research seeks to expand the knowledge in the characteristics of power lines and to develop a channel model that can be used for designing… (more)

Meng, Han.

2008-01-01T23:59:59.000Z

362

Double Bottom Line Project Report:Assessing Social Impact In Double Bottom Line Ventures  

E-Print Network (OSTI)

of Key Characteristics Glossary Method Summaries Theories ofin double bottom line ventures methods catalog glossary ofterms glossary of terms This glossary defines the variables

Rosenzweig, William

2004-01-01T23:59:59.000Z

363

EPRI Transmission Line Reference Book (Blue Book): 115-345 kV Compact Line Design  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the Blue Book, which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines. Note that this electronic report is being pu...

2007-12-13T23:59:59.000Z

364

MCP Upgrade: Transmission Line and Pore Importance  

E-Print Network (OSTI)

In order to take advantage of all of the benefits of Multi-Channel Plate Photo-Multiplier Tubes (MCPs) a fast and efficient readout scheme must be implemented. One scheme that appears very promising is that of a transmission line coupled to a digital sampling readout. Transmission line readout allows for 2D position reconstruction, as well as an extremely fast response time, allowing for an exceptional timing resolution. I will be discussing the development of a method to connect the transmission line readout to the anode of the MCP, as well as testing the resultant MCP-transmission line readout system. This testing occurred at Argonnes laser lab, which featured a tunable fast rise time laser as well as a data acquisition system with a low noise level. A study to determine the importance of the pore size of the MCP was also carried out at Argonnes laser lab. In this study two MCPs which differed only in pore size (25µm and 10µm) were tested and their timing resolutions were compared. The objective of the following discussion is to quantify the effectiveness of the transmission line readout, learn more about the nature of the MCP and its signals, and look for ways in which to improve upon the present readout technique. 2 Tyler Natoli 1

Tyler Natoli; Advisor Henry Frisch

2009-01-01T23:59:59.000Z

365

A high accuracy computed water line list  

E-Print Network (OSTI)

A computed list of H$_{2}$$^{16}$O infra-red transition frequencies and intensities is presented. The list, BT2, was produced using a discrete variable representation two-step approach for solving the rotation-vibration nuclear motions. It is the most complete water line list in existence, comprising over 500 million transitions (65% more than any other list) and it is also the most accurate (over 90% of all known experimental energy levels are within 0.3 cm$^{-1}$ of the BT2 values). Its accuracy has been confirmed by extensive testing against astronomical and laboratory data. The line list has been used to identify individual water lines in a variety of objects including: comets, sunspots, a brown dwarf and the nova-like object V838 Mon. Comparison of the observed intensities with those generated by BT2 enables physical values to be derived for these objects. The line list can also be used to provide an opacity for models of the atmospheres of M-dwarf stars and assign previously unknown water lines in laboratory spectra.

R. J. Barber; J. Tennyson; G. J. Harris; R. N. Tolchenov

2006-01-11T23:59:59.000Z

366

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

367

SN Environmental Review (NEPA)  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Rates You are here: SN Home page > Environment Environmental Review-NEPA Major Initiatives are the large projects that SNR is currently involved in. As new projects are added, and existing ones completed, you will find current information and updates in this area. Environmental Impact Statement-EIS Sacramento Area Voltage Support Trinity PUD Interconnection Projects Alternative Intake Project Transmission Line and Interconnection Delta-Mendota Canal / California Aqueduct Intertie (PDF - 17MB) Sutter Power Project San Luis Transmission Project Environmental Assessment-EA San Joaquin Valley Right-of-Way Maintenance Project North Area Right-of-Way Maintenance Project Sacramento Valley Right-of-Way Maintenance Project Categorical Exclusions-CX Cottonwood - Roseville OPGW Project CX (PDF - 6787KB)

368

Visual Aspects of the Flanking Line in Severe Thunderstorms  

Science Conference Proceedings (OSTI)

Photographs are presented that illustrate the various forms in which “flanking lines” exist in nature. Flanking lines may appear not only as the commonly observed sloping line of cumulus congestus, but also as erect towers with a vertical face, ...

Howard B. Bluestein

1986-04-01T23:59:59.000Z

369

Electric Transmission Lines (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

370

Inductive gas line for pulsed lasers  

DOE Patents (OSTI)

A gas laser having a metal inlet gas feed line assembly shaped as a coil, to function as an electrical inductance and therefore high impedance to pulses of electric current applied to electrodes at opposite ends of a discharge tube of a laser, for example. This eliminates a discharge path for the laser through the inlet gas feed line. A ferrite core extends through the coil to increase the inductance of the coil and provide better electric isolation. By elimination of any discharge breakdown through the gas supply, efficiency is increased and a significantly longer operating lifetime of the laser is provided.

Benett, W.J.; Alger, T.W.

1982-09-29T23:59:59.000Z

371

Developments in line-voltage thermostats  

Science Conference Proceedings (OSTI)

A thermostat that provides reliable, accurate temperature control is the key to a comfortable, efficient space-heating system. The lack of a commercially available line-voltage thermostat that is affordable and performs well has been a significant factor in limiting the comfort and popularity of zoned residential electric heating systems. With EPRI support, two manufacturers have developed innovative, electronics-based line-voltage thermostats that offer a cost-effective control option for creating a comfortable environment with zoned electric heat. These thermostats also may help reduce energy consumption.

Kesselring, J.

1992-09-01T23:59:59.000Z

372

Boron-10 Lined Proportional Counter Wall Effects  

SciTech Connect

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project 'Coincidence Counting With Boron-Based Alternative Neutron Detection Technology' at Pacific Northwest National Laboratory (PNNL) for development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube based system in the configuration of a coincidence counter. This report provides information about how variations in proportional counter radius and gas pressure in a typical coincident counter design might affect the observed signal from boron-lined tubes. A discussion comparing tubes to parallel plate counters is also included.

Siciliano, Edward R.; Kouzes, Richard T.

2012-05-01T23:59:59.000Z

373

EC Transmission Line Risk Identification and Analysis  

SciTech Connect

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

374

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

375

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 25690 of 31,917 results. 81 - 25690 of 31,917 results. Download CX-002690: Categorical Exclusion Determination Pajarito Road Right-Of-Way Shift at TA-50 and TA-55 CX(s) Applied: B1.13 Date: 04/21/2010 Location(s): New Mexico Office(s): Los Alamos Site Office http://energy.gov/nepa/downloads/cx-002690-categorical-exclusion-determination Download CX-002212: Categorical Exclusion Determination Shunt Capacitor Addition at Jones Canyon Substation CX(s) Applied: B4.11 Date: 04/21/2010 Location(s): Arlington, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-002212-categorical-exclusion-determination Download CX-006352: Categorical Exclusion Determination Design, Install, and Operate New 2F Evaporator Feed Pump CX(s) Applied: B1.3 Date: 06/24/2011 Location(s): Aiken, South Carolina

376

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 25, 2011 August 25, 2011 CX-006585: Categorical Exclusion Determination Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside Trail CX(s) Applied: B4.9 Date: 08/25/2011 Location(s): Beaverton, Oregon Office(s): Bonneville Power Administration August 25, 2011 CX-006514: Categorical Exclusion Determination HAZGAS and Fire Alarm Monitoring System CX(s) Applied: A11, B2.2, B2.3 Date: 08/25/2011 Location(s): Albany, Oregon Office(s): Fossil Energy, National Energy Technology Laboratory August 24, 2011 CX-006778: Categorical Exclusion Determination Alvey Maintenance Headquarters Pole Storage Facility Upgrades CX(s) Applied: B4.6 Date: 08/24/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration August 24, 2011 CX-006776: Categorical Exclusion Determination

377

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 30140 of 31,917 results. 31 - 30140 of 31,917 results. Download CX-010425: Categorical Exclusion Determination Pearl-Keeler Right-of-Way (ROW) Marking Project CX(s) Applied: B1.3 Date: 06/11/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010425-categorical-exclusion-determination Download CX-010427: Categorical Exclusion Determination Hat Rock Switching Station Replacement Project CX(s) Applied: B4.6 Date: 06/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010427-categorical-exclusion-determination Download CX-010428: Categorical Exclusion Determination Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon

378

Line graph explorer: scalable display of line graphs using Focus+Context  

Science Conference Proceedings (OSTI)

Scientific measurements are often depicted as line graphs. State-of-the-art high throughput systems in life sciences, telemetry and electronics measurement rapidly generate hundreds to thousands of such graphs. Despite the increasing volume and ubiquity ... Keywords: Focus+Context, line graph

Robert Kincaid; Heidi Lam

2006-05-01T23:59:59.000Z

379

Non-Transgenic Cell Lines for Identifying Target Premalignant ...  

Biofuels; Biotechnology & Medicine. ... Non-Transgenic Cell Lines for Identifying Target Premalignant Genes IB-2023 : Berkeley Lab's S3 cell lines display partial

380

EIS-0325: Schultz-Hanford Area Transmission Line Project Final...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003) EIS-0325: Schultz-Hanford Area Transmission Line Project...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

382

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion,...

383

EA-1960: Townsite Solar Project Transmission Line, Clark County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management,...

384

Amended Notice of Intent for the Northern Pass Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

385

EA-1896: Williston to Stateline Transmission Line Project, Mountrail...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project,...

386

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

387

Request for Information on Permitting of Transmission Lines:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal...

388

Secretary Chu Visits Russian Seaport, Checks Out Second Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Russian Seaport, Checks Out Second Line of Defense Nuclear Detection System Secretary Chu Visits Russian Seaport, Checks Out Second Line of Defense Nuclear Detection System June 7,...

389

On-line load relief control  

SciTech Connect

This paper describes the results of an investigation concerning the on-line prediction and enhancement of load relief. The effects of voltage fluctuation, system voltage profile control and generator voltage adjustment on load relief and load shedding operations during under-frequency transients are studied. The technique promoted in the paper may be used to reduce system spinning reserve or prospective load shedding.

Jovanovic, S.; Fox, B.; Thompson, J.G. (Queen' s Univ. of Belfast (United Kingdom))

1994-11-01T23:59:59.000Z

390

Mesoscale Observations of a Prefrontal Squall Line  

Science Conference Proceedings (OSTI)

Phase I of the Cold Fronts Research Programme was carried out during November/December 1980 in south-eastern Australia. Data from a frontal event on 27 November are analyzed, with particular emphasis on a squall line that formed over the Southern ...

W. L. Physick; W. K. Downey; A. J. Troup; B. F. Ryan; P. J. Meighen

1985-11-01T23:59:59.000Z

391

Architecting automotive product lines: industrial practice  

Science Conference Proceedings (OSTI)

This paper presents an in-depth view of how architects work with maintaining product line architectures in the automotive industry. The study has been performed at two internationally well-known companies, one car manufacture and one commercial vehicle ... Keywords: architecting, automotive industry, case study, process

Håkan Gustavsson; Ulrik Eklund

2010-09-01T23:59:59.000Z

392

In-line beam current monitor  

SciTech Connect

An intense relativistic electron beam current monitor for a gas neutralized beam transport line includes a first foil for conducting plasma current to the wall where it is measured as it traverses an inductive loop formed by a cavity in the wall. An insulator foil separates the first foil from a second conducting foil which returns the current to the plasma environment.

Ekdahl, Jr., Carl A. (Albuquerque, NM); Frost, Charles A. (Albuquerque, NM)

1986-01-01T23:59:59.000Z

393

Future Inspection of Overhead Transmission Lines  

Science Conference Proceedings (OSTI)

This report documents scenarios and technologies that can be applied in the future for the inspection of transmission lines. Scenarios describe the utilization of a range of concepts, including distributed sensors, unmanned airborne vehicles, RF communication, and robotics. An approach to performing demonstration projects using currently available technologies is provided and will be implemented in the following phases of the project.

2008-06-23T23:59:59.000Z

394

100-N temporary construction line considerations  

SciTech Connect

Present thinking and planning appears to be developing from the following factors as concern the 13.8 KV temporary construction power limit. 1. It is understood that the present intent is to supply 100-N operating requirements from a single stub source in the 230 KV loop. 2. The original thoughts were to obtain construction power over a 13.8 KV line from 151-D substation. 3. Construction load requirements are now less than originally planned since steam has been substituted for electrical drive of primary loop pumps and 5500 hp motor tests are no longer necessary. 4. An extreme emergency backup source for the K plants has always been of concern, although minimized in recent planning. It is desirable to review the temporary construction line requirements from a future operating viewpoint to determine if the line could be useful to the operating plants after completion of construction. It is highly desirable to provide T.C. power source from K plants rather than 151-D and then leave the line and breakers in place for future maintenance assistance and as extreme emergency backup to K plants.

Mollerus, F.J.

1958-12-30T23:59:59.000Z

395

Tassel Pipeline Tutorial (Command Line Interface)  

E-Print Network (OSTI)

Tassel Pipeline Tutorial (Command Line Interface) Terry Casstevens Institute for Genomic Diversity, Cornell University May 11, 2011 #12;Tassel Pipeline Basics... · Consists of Modules (i.e. Plugins) · Output from one Module can be Input to another Module. Determined by order specified. run_pipeline

Buckler, Edward S.

396

Artistic minimal rendering with lines and blocks  

Science Conference Proceedings (OSTI)

Many non-photorealistic rendering techniques exist to produce artistic effects from given images. Inspired by various artists, interesting effects can be produced by using a minimal rendering, where the minimum refers to the number of tones as well as ... Keywords: Image abstraction, Line drawing, Non-photorealistic rendering, Tonal blocks

Paul L. Rosin, Yu-Kun Lai

2013-07-01T23:59:59.000Z

397

FISK ASSOCIATES  

Office of Legacy Management (LM)

right-of-way line in an easterly direction from the easterly sideline of New Jersey State Highway Route No. 17, and running, thence; (1) S.llO-02'-47"W.r a distance of 233.40...

398

Herbicide Use Safety for Vegetation Management on Powerline Corridors  

Science Conference Proceedings (OSTI)

This report presents original research on herbicide use safety in association with vegetation management on electric transmission line rights of way.BackgroundThe Electric Power Research Institute (EPRI) conducted integrated vegetation management assessments for five electric utilities between 2006 and 2009, using EPRI-developed procedures and standards of integrated vegetation management performance. Observations during the assessments indicated that utility ...

2012-11-28T23:59:59.000Z

399

Developing long-term stable product line architectures  

Science Conference Proceedings (OSTI)

Product lines are usually built for the long term in order to repay the initial investment. While long-term stable software systems are already hard, if they are developed individually, it is even harder for complete product lines. At the time a new ... Keywords: AUTOSAR, multi product lines, scoping, software architecture, software product lines

Christian Tischer; Birgit Boss; Andreas Müller; Andreas Thums; Rajneesh Acharya; Klaus Schmid

2012-09-01T23:59:59.000Z

400

Sierra Pacific Power Company Alturas Transmission Line Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

transmission line to withstand expected maximum fault displacement. . ES-49 KesidualI*acf '.:, , ,,.,, .. .... ...... .. . ... . .. . .. .. . . . .. ,,. ,::.,. ,.,,, ,..,, lot...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Mega-scale product line engineering at General Motors  

Science Conference Proceedings (OSTI)

General Motors faces probably the most complex Systems and Software Product Line Engineering (PLE) challenges ever, in terms of product complexity, richness of variation, size of organization, and an unforgiving requirement to support over a dozen simultaneous ... Keywords: bill-of-features, feature modeling, feature profiles, hierarchical product lines, product baselines, product configurator, product line engineering, product portfolio, software product lines, variation points

Rick Flores; Charles Krueger; Paul Clements

2012-09-01T23:59:59.000Z

402

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) 2013 Annual Planning Summary for the Southwestern Area Power Administration

403

Definition: Line Transformer Monitors | Open Energy Information  

Open Energy Info (EERE)

Transformer Monitors Transformer Monitors Jump to: navigation, search Dictionary.png Line Transformer Monitors Transformer Monitoring System can monitor different aspects of transformers, including oil levels and multiple temperatures within the transformer. This allows for analysis of the health of either individual key power transformers or multiple power transformers networked in the system. For example, the transformer monitors provide transformer oil dissolved gas analysis (DGA), oil temperature, ambient temperature, and moisture in oil measurements. These measurements are made in relation to transformer load.[1] Related Terms transformer, system, transformer References ↑ https://www.smartgrid.gov/category/technology/line_transformer_monitors [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like.

404

LINE Commission Visits Idaho National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how it worked. Participants included, from top right in the INL: INL Laboratory Director John Grossenbacher; North Wind Group President Sylvia Median; former Idaho U.S. Senator Larry Craig; Idaho Department of Labor�s Dwight Johnson; BEA Government Affairs Boise Manager Brian Whitlock; and Idaho House District 33 Rep. Jeff Thompson.

405

Line-of-sight deposition method  

DOE Patents (OSTI)

A line-of-sight method of depositing a film having substantially 100% of theoretical density on a substrate. A pressure vessel contains a target source having a surface thereof capable of emitting particles therefrom and a substrate with the source surface and the substrate surface positioned such that the source surface is substantially parallel to the direction of the particles impinging upon the substrate surface, the distance between the most remote portion of the substrate surface receiving the particles and the source surface emitting the particles in a direction parallel to the substrate surface being relatively small. The pressure in the vessel is maintained less than about 5 microns to prevent scattering and permit line-of-sight deposition. By this method the angles of incidence of the particles impinging upon the substrate surface are in the range of from about 45/sup 0/ to 90/sup 0/ even when the target surface area is greatly expanded to increase the deposition rate.

Patten, J.W.; McClanahan, E.D.; Bayne, M.A.

1980-04-16T23:59:59.000Z

406

Line-of-sight deposition method  

DOE Patents (OSTI)

A line-of-sight method of depositing a film having substantially 100% of theoretical density on a substrate. A pressure vessel contains a target source having a surface thereof capable of emitting particles therefrom and a substrate with the source surface and the substrate surface positioned such that the source surface is substantially parallel to the direction of the particles impinging upon the substrate surface, the distance between the most remote portion of the substrate surface receiving the particles and the source surface emitting the particles in a direction parallel to the substrate surface being relatively small. The pressure in the vessel is maintained less than about 5 microns to prevent scattering and permit line-of-sight deposition. By this method the angles of incidence of the particles impinging upon the substrate surface are in the range of from about 45.degree. to 90.degree. even when the target surface area is greatly expanded to increase the deposition rate.

Patten, James W. (Richland, WA); McClanahan, Edwin D. (Richland, WA); Bayne, Michael A. (West Richland, WA)

1981-01-01T23:59:59.000Z

407

Multi-transmission-line-beam interactive system  

E-Print Network (OSTI)

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube (TWT) due to J.R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides for: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Alexander Figotin; Guillermo Reyes

2013-04-19T23:59:59.000Z

408

Boron-10 Lined Proportional Counter Model Validation  

SciTech Connect

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project “Coincidence Counting With Boron-Based Alternative Neutron Detection Technology” at Pacific Northwest National Laboratory (PNNL) for the development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube-based alternative system in the configuration of a coincidence counter. This report discusses the validation studies performed to establish the degree of accuracy of the computer modeling methods current used to simulate the response of boron-lined tubes. This is the precursor to developing models for the uranium neutron coincidence collar under Task 2 of this project.

Lintereur, Azaree T.; Siciliano, Edward R.; Kouzes, Richard T.

2012-06-30T23:59:59.000Z

409

Overhead Transmission Line Inspector Workshop Proceedings - 2012  

Science Conference Proceedings (OSTI)

 This report presents the proceedings of the Electric Power Research Institute (EPRI) Overhead Transmission Line Inspector Workshop, which was held Monday, July 30, through Wednesday, August 1, 2012, at the Hyatt Place Hotel and at Georgia Power’s Klondike Training Center in Lithonia, Georgia.The first half day of the workshop focused on inspection and assessment, with a participant roundtable discussion, followed by utility, vendor and EPRI presentations on the ...

2012-11-14T23:59:59.000Z

410

A Guide for Transmission Line Voltage Upgrade  

Science Conference Proceedings (OSTI)

In the last few decades, construction of new transmission facilities has not caught up with the demand for electric power. The problem of transmission capacity shortage was further compounded by deregulation of the power industry, which allows power to be dispatched from any generation source for the lowest energy cost. As a result, lines that were not planned for these power flows may now be overloaded. A number of bottlenecks were thus created, restricting power transfer from one location to another. U...

2008-12-09T23:59:59.000Z

411

Managing Transmission Line Steel Structures, Version 2  

Science Conference Proceedings (OSTI)

Utilities are under more pressure than ever to efficiently utilize existing overhead lines by optimizing their life and reliability. A key issue involves the question of how to efficiently inspect and maintain transmission systems. In light of aging transmission and distribution infrastructures, resources are needed to design and implement cost-effective assessment and maintenance programs. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance progr...

2004-12-02T23:59:59.000Z

412

Formation of Mesoscale Lines of Pirecipitation: Severe Squall Lines in Oklahoma during the Spring  

Science Conference Proceedings (OSTI)

Four distinct kinds of severe, mesoscale convective-line development are identified in Oklahoma during the spring based on the analysis of an 11-year period of reflectivity data from the National Severe Storms Laboratory's 10-cm radar in Norman, ...

Howard B. Bluestein; Michael H. Jain

1985-08-01T23:59:59.000Z

413

X-ray Lines in Gamma-ray Bursts and Cerenkov Line Mechanism  

E-Print Network (OSTI)

X-ray emission and absorption features are of great importance in our understanding the nature and environment of gamma-ray bursts (GRBs). So far, iron emission lines have been detected in at least four GRB afterglows. In this paper, the observational properties and physical constraints on materials surrounding GRB sources are reviewed, and several classes of theoretical models are also discussed. We will specially concentrate on the Cerenkov line mechanism, in which the broad iron lines are expected, and a small mass of Fe is required to produce the large line luminosity. In addition, our interpretation can favor the recent jet unified model for different classes of gamma-ray bursts with a standard energy reservoir.

Wei Wang

2004-07-30T23:59:59.000Z

414

Formation of Mesoscale Lines of Precipitation: Nonsevere Squall Lines in Oklahoma during the Spring  

Science Conference Proceedings (OSTI)

The development of mesoscale lines of nonsevere convection in Oklahoma during the spring is discussed. This documentation complements the study by Bluestein and Jain of severe, mesoscale convective-fine development. Three major classes of squall ...

Howard B. Bluestein; Gregory T. Marx; Michael H. Jain

1987-11-01T23:59:59.000Z

415

Solar winds along curved magnetic field lines  

E-Print Network (OSTI)

Both remote-sensing measurements using the interplanetary scintillation (IPS) technique and in situ measurements by the Ulysses spacecraft show a bimodal structure for the solar wind at solar minimum conditions. At present what makes the fast wind fast and the slow wind slow still remains to be answered. While a robust empirical correlation exists between the coronal expansion rate $f_c$ of the flow tubes and the speeds $v$ measured in situ, further data analysis suggests that $v$ depends on more than just $f_c$. We examine whether the non-radial shape of field lines, which naturally accompanies any non-radial expansion, could be an additional geometrical factor. We solved the transport equations incorporating the heating due to turbulent Alfv\\'en waves for an electron-proton solar wind along curved field lines given by an analytical magnetic field model, representative of a solar minimum corona. The field line shape is found to influence substantially the solar wind parameters, reducing the asymptotic speed ...

Li, Bo; Chen, Yao

2011-01-01T23:59:59.000Z

416

Transmission line environmental assessment guidance document  

Science Conference Proceedings (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

417

ICE LINES IN CIRCUMBINARY PROTOPLANETARY DISKS  

Science Conference Proceedings (OSTI)

I examine the position of the ice line in circumbinary disks heated by steady mass accretion and stellar irradiation and compare with the critical semimajor axis, interior to which planetary orbits are unstable. There is a critical binary separation, dependent on the binary parameters and disk properties, for which binaries with separations larger than this critical value have ice lines that lie interior to the boundary of stability. For an equal-mass binary comprised of 1 M{sub Sun} components, this critical separation is Almost-Equal-To 1.04 AU, and scales weakly with mass accretion rate and Rosseland mean opacity ({proportional_to}[ M-dot {kappa}{sub R}]{sup 2/9}). Assuming a steady mass accretion rate of M-dot {approx}10{sup -8} M{sub Sun} yr{sup -1} and a Rosseland mean opacity of {kappa}{sub R} {approx} 1 cm{sup 2} g{sup -1}, I show that {approx}> 80% of all binary systems with component masses M{sub *} {approx}ice lines that lie interior to the critical semimajor axis. This suggests that rocky planets should not form in these systems, a prediction which can be tested by looking for planets around binaries with separations larger than the critical separation with Kepler (difficult) and with microlensing.

Clanton, Christian, E-mail: clanton@astronomy.ohio-state.edu [Department of Astronomy, Ohio State University, 140 W. 18th Ave., Columbus, OH 43210 (United States)

2013-05-01T23:59:59.000Z

418

Stand-off transmission lines and method for making same  

DOE Patents (OSTI)

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress. 16 figures.

Tuckerman, D.B.

1991-05-21T23:59:59.000Z

419

Stand-off transmission lines and method for making same  

DOE Patents (OSTI)

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress.

Tuckerman, David B. (Livermore, CA)

1991-01-01T23:59:59.000Z

420

Transmission line including support means with barriers  

DOE Patents (OSTI)

A gas insulated transmission line includes an elongated outer sheath, a plurality of inner conductors disposed within and extending along the outer sheath, and an insulating gas which electrically insulates the inner conductors from the outer sheath. A support insulator insulatably supports the inner conductors within the outer sheath, with the support insulator comprising a main body portion including a plurality of legs extending to the outer sheath, and barrier portions which extend between the legs. The barrier portions have openings therein adjacent the main body portion through which the inner conductors extend.

Cookson, Alan H. (Pittsburgh, PA)

1982-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Curecanti-Lost Canyon 230-kV Transmission Line Routine Maintenance of Right-of-Way Roads La Plata, Montezuma, Dolores, San Miguel, and Montrose Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus- Montrose (HSP-MTR) 345-kilovolt (leV) Transmission Line located between Montrose and Norwood, Colorado. The project will provide safe access to transmission line structures 0 to 194 (approximately 110 miles). Also, Westem proposes to perform routine maintenance between structures 40/1 to 59/5 of the Curecanti-Lost Canyon (CCI-LCN) 230-kV Transmission Line. The

422

B Plant ion exchange feed line leak  

SciTech Connect

>One of the objectives of the Waste Management Program is to separate the long-lived heat emitter /aup 137/Cs from the bulk of the high-level Iiquid wastes. This separation is accomplished by the ion exchange process in the 221-B Building. Interim storage of the cesium is in solution as a nitrate. The feed for the B Plant cesinm ion exchange process is pumped from the lag storage tank, 105-C, through a pipeline and several diversion boxes to the 221-B Building. On December 19, 1969, a leak was discovered near the 241-C-152 diversion box in the section of this line, V-122, from the 105-C tank. Although the leak represented a loss of feed for the processing of /sup 137/Cs, more important was the consequence of environmental contmination to the soil from the line leak. For this reason, an investigation was made to estblish the extent of the radioactivity spread. The results of a well drilling operation undertaken to define the boundary and to estimate the extent of the leak are summarized. (CR)

Tanaka, K.H.

1971-01-25T23:59:59.000Z

423

On Line Power Plant Performance Monitoring  

E-Print Network (OSTI)

Maintaining efficient and reliable plant operation is a prime objective in the generation of power. These are important considerations for utilities and particularly for Independent Power Producers as they become a more significant factor in the energy supply. On Line Performance Monitoring is an effective method to improve operating efficiency, detect and correct off nominal operation and expediently analyze cause and effect component performance relationships. The heart of a Performance Monitor is a modular collection of calculations used to determine performance indices in the power plant. Calculated performance indices are used in numerous applications: 1. To measure actual component performance compared to guaranteed or expected performance 2. To identify controllable operating problems and provide operator guidance in achieving the best operation of the plant 3. To evaluate component performance and deterioration for use in a maintenance program 4. To develop cost data and incremental cost characteristics for the economic operation or dispatch of the unit with other system energy sources 5. To document plant performance compared to base line data for the demonstration of efficient operation and improved availability. This paper will discuss the many advantages associated with a Performance Monitor system, their application, the benefits which may be realized and the potential of this concept with advanced diagnostic capability.

Ahner, D. J.; Priestley, R. R.

1990-06-01T23:59:59.000Z

424

Lorentz transformations with arbitrary line of motion  

E-Print Network (OSTI)

Sometimes it becomes a matter of natural choice for an observer (A) that he prefers a coordinate system of two-dimensional spatial x-y coordinates from which he observes another observer (B) who is moving at a uniform speed along a line of motion, which is not collinear with As chosen x or y axis. It becomes necessary in such cases to develop Lorentz transformations where the line of motion is not aligned with either the x or the y-axis. In this paper we develop these transformations and show that under such transformations, two orthogonal systems (in their respective frames) appear non-orthogonal to each other. We also illustrate the usefulness of the transformation by applying it to three problems including the rod-slot problem. The derivation has been done before using vector algebra. Such derivations assume that the axes of K and K-prime are parallel. Our method uses matrix algebra and shows that the axes of K and K-prime do not remain parallel, and in fact K and K-prime which are properly orthogonal are observed to be non-orthogonal by K-prime and K respectively. http://www.iop.org/EJ/abstract/0143-0807/28/2/004

Chandru Iyer; G. M. Prabhu

2008-09-18T23:59:59.000Z

425

COBE Observations of Interstellar Line Emission  

E-Print Network (OSTI)

The FIRAS instrument on the COBE satellite has conducted an unbiased survey of the far-infrared emission from our Galaxy. The first results of this survey were reported by Wright et al. (1991), and later conclusions were reported in Bennett et al. (1994). I report the results of analyses of this spectral survey, which includes emission lines from 158 micron C+, 122 micron and 205 micron N+, 370 micron and 609 micron neutral C, and CO J=2-1 through 5-4. The morphological distribution along the galactic plane (b=0 deg) for all the spectral line emission, and the high galactic latitude intensities of the strong C+ and 205 micron N+ emission are discussed. The high galactic latitude intensity of the 158 micron fine structure transition from C+ is I = (1.43 +/- 0.12)*1E-6 csc|b| erg/cm^2/s/sr for |b| > 15 deg and it decreases more rapidly than the far infrared intensity with increasing galactic latitude.

Edward L. Wright

1996-12-10T23:59:59.000Z

426

Cerenkov Line Emission as a Possible Mechanism of X-ray Lines in Gamma-ray Bursts  

E-Print Network (OSTI)

The recent discoveries of X-ray lines in the afterglows of gamma-ray bursts (GRBs) provide significant clues to the nature of GRB progenitors and central environments. However, the iron line interpretation by fluorescence or recombination mechanism requires a large amount of iron material. We argue that the very strong iron line could be attributed to an alternative mechanism: Cerenkov line emission since relativistic electrons and dense medium exist near GRB sites. Therefore, the broad iron lines are expected, and line intensity will be nearly independent of the iron abundance, the medium with the anomalously high Fe abundance is not required.

W. Wang; Y. Zhao; J. H. You

2002-03-14T23:59:59.000Z

427

Loss of line shutdown for line-commutated utility-interactive inverter  

SciTech Connect

The line-commutated, single-phase, utility-interactive inverter has been used in utility-connected photovoltaic (PV) and wind energy systems because it is commercially available at an attractive price. If unity power factor operation is required, a shunt capacitor can be used. This causes a problem if the utility line is disconnected; the inverter can continue to run and can thus be a hazard. This can be solved by using a fast-acting overvoltage detection circuit which operates directly on the inverter control electronics.

Landsman, E.E.

1981-03-01T23:59:59.000Z

428

The Pre-storm Environment of Midlatitude Prefrontal Squall Lines  

Science Conference Proceedings (OSTI)

Composite environmental profiles Of wind and temperature are presented for squall line cases that are spatially removed from frontal disturbances. The motions of the squall lines are inferred from radar data, and the mean environmental wind ...

Jonathan Wyss; Kerry A. Emanuel

1988-03-01T23:59:59.000Z

429

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

430

Numerical Simulation of a Midlatitude Squall Line in Two Dimensions  

Science Conference Proceedings (OSTI)

A two-dimensional, anelastic cloud model was used in attempts to numerically replicate the observed structure of a midlatitude squall line. Initial conditions were adapted from observations of the 22 May 1976 Oklahoma line. Model simulations were ...

Robert G. Fovell; Yoshi Ogura

1988-12-01T23:59:59.000Z

431

Momentum Flux by Lines of Cumulonimbus over the Tropical Oceans  

Science Conference Proceedings (OSTI)

Examination of aircraft and rawinsonde data gathered in nine tropical mesoscale convective line cases indicates that all but two lines systematically increased front-to-rear momentum at heights greater than about 4 km, and rear-to-front momentum ...

Margaret A. LeMone; Gary M. Barnes; Edward J. Zipser

1984-06-01T23:59:59.000Z

432

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network (OSTI)

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

433

E3: Success Story - Rapid-Line Inc. | Economy – Energy ...  

Science Conference Proceedings (OSTI)

... Lindquist and other Rapid-Line staff worked with the Green ... is true and not just a short-lived trend in ... Mark Lindquist, President, Rapid-Line Inc. ...

2013-11-13T23:59:59.000Z

434

Part 1: The Bottom Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: The Bottom Line Part 1: The Bottom Line Question: What is different about decommissioning under CERCLA from the way DOE has decommissioned facilities in the past? Answer: DOE...

435

Discrete Propagation in Numerically Simulated Nocturnal Squall Lines  

Science Conference Proceedings (OSTI)

Simulations of a typical midlatitude squall line were used to investigate a mechanism for discrete propagation, defined as convective initiation ahead of an existing squall line leading to a faster propagation speed for the storm complex. Radar ...

Robert G. Fovell; Gretchen L. Mullendore; Seung-Hee Kim

2006-12-01T23:59:59.000Z

436

Experimental measurements of electron scattering parameters in Cu narrow lines  

Science Conference Proceedings (OSTI)

Future generations of integrated circuits will require interconnects with metallic lines at dimensions below 50nm. When Cu is used, the electron mean free path becomes similar to the characteristic dimensions of the structure of the metallic line (grain ...

S. Maítrejean; R. Gers; T. Mourier; A. Toffoli; G. Passemard

2006-11-01T23:59:59.000Z

437

Form Follows Transit? The Blue Line Corridor's Development Potentials  

E-Print Network (OSTI)

Urotat of Conneeto i-g Lines) Dash 4/RTD 23/ Red Line RTD15 RTDI0 RTD 2 resideR’l/industr’l crosswalks depar~re? no

Loukaitou-Sideris, Anastasia; Banerjee, Tridib

1994-01-01T23:59:59.000Z

438

A Theory for Strong, Long-Lived Squall Lines  

Science Conference Proceedings (OSTI)

We study herein the mechanics of long-lived, line-oriented, precipitating cumulus convection (squall lines) using two- and three-dimensional numerical models of moist convection. These models, used in juxtaposition, enable us to address the ...

Richard Rotunno; Joseph B. Klemp; Morris L. Weisman

1988-02-01T23:59:59.000Z

439

North American Short Line and Regional Railroads Industry Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Short Line and American Short Line and Short Line and American Short Line and Regional Railroad Association Regional Railroad Association " " The Voice of America The Voice of America ' ' s Independent Railroads s Independent Railroads " " 4/27/2005 2 ASLRRA Membership ASLRRA Membership 0 100 200 300 400 500 600 700 800 Total Number of Member Companies 1943 1953 1963 1973 1983 1993 2003 Year ASLRRA Member History (1943 - 2003) Associate Railroad

440

Electric and Magnetic Field Exposure During Live Line Work  

Science Conference Proceedings (OSTI)

An employee performing work on a transmission line while that line is energized is subjected to the local electric and magnetic fields produced by the voltage and current on the line. The electric field can result in spark discharges, contact currents, and stimulation of the body hair with attendant annoyance. Magnetic fields do not result in shock phenomena, but have become of concern to some people with regard to alleged health effects. Magnetic field shielding is not practical for live line ...

2013-10-07T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Emergency control of synchronous and nonsynchronous tie lines  

SciTech Connect

It is shown that for power systems using ''weak'' synchronous tie lines (ac lines), by employing backup separation with a mutual angle exceeding the critical value and allocating a portion of the generators to the receiving power system, it is possible to achieve synchronous-tie emergency-control capabilities close to those provided by emergency control of a nonsynchronous tie (a line and dc link as well as a line with electromechanical converters).

Kolonskii, T.V.

1980-01-01T23:59:59.000Z

442

Focusing and matching properties of the ATR transfer line  

Science Conference Proceedings (OSTI)

The AGS to RHIC (AtR) beam transfer line has been constructed and will be used to transfer beam bunches from the AGS machine into the RHIC machine which is presently under construction at BNL. The original design of the AtR line has been modified. This article will present the optics of the various sections of the existing AtR beam line, as well as the matching capabilities of the AtR line to the RHIC machine.

Tsoupas, N.; Fischer, W.; Kewisch, J.; MacKay, W.W.; Peggs, S.; Pilat, F.; Tepikian, S.; Wei, J.

1997-07-01T23:59:59.000Z

443

SunLine Tests HHICE Bus in Desert Climate  

DOE Green Energy (OSTI)

Fact sheet describes the demonstration of a hybrid hydrogen internal combustion engine (HHICE) bus at SunLine Transit Agency.

Not Available

2006-10-01T23:59:59.000Z

444

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Savings Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission...

445

In-Line Fluid Analysis Technology - Available Technologies ...  

Computers & Electronics; Manufacturing & Warehousing; Oil & Gas; Brochure(s) In-Line Fluid Analysis Brochure (pdf) Enabled by the Office ...

446

Line Emission from Optically Thick RelativisticAccretion Tori  

SciTech Connect

We calculate line emission from relativistic accretion tori around Kerr black holes and investigate how the line profiles depend on the viewing inclination, spin of the central black hole, parameters describing the shape of the tori, and spatial distribution of line emissivity on the torus surface. We also compare the lines with those from thin accretion disks. Our calculations show that lines from tori and lines from thin disks share several common features. In particular, at low and moderate viewing inclination angles they both have asymmetric double-peaked profiles with a tall, sharp blue peak and a shorter red peak which has an extensive red wing. At high viewing inclination angles they both have very broad, asymmetric lines which can be roughly considered as single-peaked. Torus and disk lines may show very different red and blue line wings, but the differences are due to the models for relativistic tori and disks having differing inner boundary radii. Self-eclipse and lensing play some role in shaping the torus lines, but they are effective only at high inclination angles. If inner and outer radii of an accretion torus are the same as those of an accretion disk, their line profiles show substantial differences only when inclination angles are close to 90{sup o}, and those differences are manifested mostly at the central regions of the lines instead of the wings.

Fuerst, Steven V.; /KIPAC, Menlo Park /Mullard Space Sci. Lab.; Wu, Kinwah; /Mullard Space Sci. Lab.

2007-09-14T23:59:59.000Z

447

the Front Line of Medicine to Prevent Needless Work Disability  

E-Print Network (OSTI)

Preparing the Front Line of Medicine to Prevent Needless Work Disability: Private 4. Free on-line CME; "Medical Rounds" in a talk show format 3. Free live;6 Approaches 1. Sessions at exis9ng medical educa9on events 2. Offer of on-line CME training

448

An approach to architectural analysis of product lines  

Science Conference Proceedings (OSTI)

This paper addresses the issue of how to perform architectural analysis on an existing product line architecture. The con tribution of the paper is to identify and demonstrate a repeatable product line architecture analysis process. The approach defines ... Keywords: interferometry software, product lines, software architecture analysis, software archtecture

Gerald C. Gannod; Robyn R. Lutz

2000-06-01T23:59:59.000Z

449

Mexico/Central America; Trans-Mexico gas line studied  

Science Conference Proceedings (OSTI)

This paper reports that current and future pipe line activity in Mexico and Central America is at a low level, with Pemex constructing a small amount of gas transmission and liquids lines. However, plans for a trans-Mexico gas transmission line for imports and exports advance.

Not Available

1991-11-01T23:59:59.000Z

450

Ozark 260-mile gas line system completed  

Science Conference Proceedings (OSTI)

Gathering gas in the Arkoma basin of Oklahoma and Arkansas for transport to market, the 260-mile Ozark gas line system runs from southwest of McAlester, Okla., to Natural Gas Pipeline Co. of America's station at Searcy, Ark. The recently completed mainline has an initial capacity of 170 million CF/day with a maximum operating pressure of 1200 psig and a delivery pressure of 700 psig at the NGPL station. The 20-in. pipeline is API 5LX-Grade X60, 0.281-in. wall thickness for Class 1 areas, 0.344 for Class 2 areas, 0.406 for Class 3 areas, and API 5LX-Grade X52, 0.500-in. wall thickness for river crossings.

Dixon, R.R.

1982-05-01T23:59:59.000Z

451

On-line tritium production monitor  

DOE Patents (OSTI)

A scintillation optical fiber system for the on-line monitoring of nuclear reactions in an event-by-event manner is described. In the measurement of tritium production one or more optical fibers are coated with enriched .sup.6 Li and connected to standard scintillation counter circuitry. A neutron generated .sup.6 Li(n )T reaction occurs in the coated surface of .sup.6 Li-coated fiber to produce energetic alpha and triton particles one of which enters the optical fiber and scintillates light through the fiber to the counting circuit. The coated optical fibers can be provided with position sensitivity by placing a mirror at the free end of the fibers or by using pulse counting circuits at both ends of the fibers.

Mihalczo, John T. (Oak Ridge, TN)

1993-01-01T23:59:59.000Z

452

On-line process control monitoring system  

DOE Patents (OSTI)

An on-line, fiber-optic based apparatus for monitoring the concentration of a chemical substance at a plurality of locations in a chemical processing system comprises a plurality of probes, each of which is at a different location in the system, a light source, optic fibers for carrying light to and from the probes, a multiplexer for switching light from the source from one probe to the next in series, a diode array spectrophotometer for producing a spectrum from the light received from the probes, and a computer programmed to analyze the spectra so produced. The probes allow the light to pass through the chemical substance so that a portion of the light is absorbed before being returned to the multiplexer. A standard and a reference cell are included for data validation and error checking.

O' Rourke, Patrick E. (Martinez, GA); Van Hare, David R. (Aiken, SC); Prather, William S. (Augusta, GA)

1992-01-01T23:59:59.000Z

453

Dispersion-free radial transmission lines  

SciTech Connect

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

454

Second Line of Defense Spares Program Assessment  

SciTech Connect

The Office of the Second Line of Defense (SLD) is part of the Department of Energy‘s (DOE) National Nuclear Security Administration (NNSA). The SLD Program accomplishes its critical global security mission by forming cooperative relationships with partner countries to install passive radiation detection systems that augment traditional inspection and law enforcement measures by alerting border officials to the presence of special nuclear or other radiological materials in cross-border traffic. An important tenet of the program is to work collaboratively with these countries to establish the necessary processes, procedures, infrastructure and conditions that will enable them to fully assume the financial and technical responsibilities for operating the equipment. As the number of operational deployments grows, the SLD Program faces an increasingly complex logistics process to promote the timely and efficient supply of spare parts.

Henderson, Dale L.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.

2012-11-20T23:59:59.000Z

455

Nonlinear transmission line based electron beam driver  

Science Conference Proceedings (OSTI)

Gated field emission cathodes can provide short electron pulses without the requirement of laser systems or cathode heating required by photoemission or thermionic cathodes. The large electric field requirement for field emission to take place can be achieved by using a high aspect ratio cathode with a large field enhancement factor which reduces the voltage requirement for emission. In this paper, a cathode gate driver based on the output pulse train from a nonlinear transmission line is experimentally demonstrated. The application of the pulse train to a tufted carbon fiber field emission cathode generates short electron pulses. The pulses are approximately 2 ns in duration with emission currents of several mA, and the train contains up to 6 pulses at a frequency of 100 MHz. Particle-in-cell simulation is used to predict the characteristic of the current pulse train generated from a single carbon fiber field emission cathode using the same technique.

French, David M.; Hoff, Brad W.; Tang Wilkin; Heidger, Susan; Shiffler, Don [Directed Energy Directorate, Air Force Research Laboratory, Kirtland AFB, New Mexico 87117 (United States); Allen-Flowers, Jordan [Program in Applied Mathematics, University of Arizona, Tucson, Arizona 85721 (United States)

2012-12-15T23:59:59.000Z

456

Power Line Calculator for Windows[trademark  

SciTech Connect

The Power Line Calculator (PLC) for Windows [trademark], version 1.0, is a program that describes the electrical characteristics of a transmission or distribution system given user-defined input. This input may consist of a combination of operating currents and phases, symmetric components, power factor, and real or reactive power. The program also allows the user to designate whether currents are present on the system neutral or in the ground. The PLC assumes that any value entered by the user remains fixed (e.g., phase current, power factor), and for underdetermined systems, basic default assumptions are incorporated: the power factor is held at or near 1.0, the net phase current is kept at or near zero, and the phase conductor currents are kept balanced. The program operates through a graphical user interface provided by Microsoft[reg sign] Windows [trademark] (version 3.1 or higher required), and the output is available in both tabular and graphic formats.

Silva, J.M. (Enertech Consultants, Campbell, CA (United States))

1992-12-01T23:59:59.000Z

457

Calibrating transport lines using LOCO techniques  

Science Conference Proceedings (OSTI)

With the 12GeV upgrade underway at CEBAF, there is a need to re-characterize the beamlines after the modifications made to it to accommodate running at higher energies. We present a linear perturbation approach to calibrating the optics model of transport lines. This method is adapted from the LOCO method in use for storage rings. We consider the effect of quadrupole errors, dipole construction errors as well as beam position monitors and correctors calibrations. The ideal model is expanded to first order in Taylor series of the quadrupole errors. A set of difference orbits obtained by exciting the correctors along the beamline is taken, yielding the measured response matrix. An iterative procedure is invoked and the quadrupole errors as well as beam position monitors and corrector calibration factors are obtained. Here we present details of the method and results of first measurements at CEBAF in early 2011.

Yves Roblin

2011-09-01T23:59:59.000Z

458

Atomic line emission analyzer for hydrogen isotopes  

DOE Patents (OSTI)

Apparatus for isotopic analysis of hydrogen comprises a low pressure chamber into which a sample of hydrogen is introduced and then exposed to an electrical discharge to excite the electrons of the hydrogen atoms to higher energy states and thereby cause the emission of light on the return to lower energy states, a Fresnel prism made at least in part of a material anomalously dispersive to the wavelengths of interest for dispersing the emitted light, and a photodiode array for receiving the dispersed light. The light emitted by the sample is filtered to pass only the desired wavelengths, such as one of the lines of the Balmer series for hydrogen, the wavelengths of which differ slightly from one isotope to another. The output of the photodiode array is processed to determine the relative amounts of each isotope present in the sample. Additionally, the sample itself may be recovered using, a metal hydride.

Kronberg, J.W.

1991-05-08T23:59:59.000Z

459

Atomic line emission analyzer for hydrogen isotopes  

DOE Patents (OSTI)

Apparatus for isotopic analysis of hydrogen comprises a low pressure chamber into which a sample of hydrogen is introduced and then exposed to an electrical discharge to excite the electrons of the hydrogen atoms to higher energy states and thereby cause the emission of light on the return to lower energy states, a Fresnel prism made at least in part of a material anomalously dispersive to the wavelengths of interest for dispersing the emitted light, and a photodiode array for receiving the dispersed light. The light emitted by the sample is filtered to pass only the desired wavelengths, such as one of the lines of the Balmer series for hydrogen, the wavelengths of which differ slightly from one isotope to another. The output of the photodiode array is processed to determine the relative amounts of each isotope present in the sample. Additionally, the sample itself may be recovered using a metal hydride.

Kronberg, J.W.

1993-03-30T23:59:59.000Z

460

Atomic line emission analyzer for hydrogen isotopes  

DOE Patents (OSTI)

Apparatus for isotopic analysis of hydrogen comprises a low pressure chamber into which a sample of hydrogen is introduced and then exposed to an electrical discharge to excite the electrons of the hydrogen atoms to higher energy states and thereby cause the emission of light on the return to lower energy states, a Fresnel prism made at least in part of a material anomalously dispersive to the wavelengths of interest for dispersing the emitted light, and a photodiode array for receiving the dispersed light. The light emitted by the sample is filtered to pass only the desired wavelengths, such as one of the lines of the Balmer series for hydrogen, the wavelengths of which differ slightly from one isotope to another. The output of the photodiode array is processed to determine the relative amounts of each isotope present in the sample. Additionally, the sample itself may be recovered using a metal hydride.

Kronberg, James W. (108 Independent Blvd., Aiken, SC 29801)

1993-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

On-Line Determination of the MTC 1 On-Line Determination of the MTC (Moderator  

E-Print Network (OSTI)

at the PWR nuclear power plant. Ann. Nucl. Energy 24: 55-64 16. Laggiard E and Runkel J (1997) Evaluation coefficient in operating nuclear power plant. In: SMORN VII, June 19-23, 1995, Avignon, France, pp 41-47 23 measurements taken at an operating power plant. #12;On-Line Determination of the MTC 11 3.1 Description

Demazière, Christophe

462

A Refined Method of Parameterizing Absorption Coefficients among Multiple Gases Simultaneously from Line-by-Line Data  

Science Conference Proceedings (OSTI)

An extension of the correlated-k distribution method that uses spectral-mapping techniques was derived to parameterize line-by-line absorption coefficients for multiple gases simultaneously for use in three-dimensional atmospheric models. In a ...

Mark Z. Jacobson

2005-02-01T23:59:59.000Z

463

EPRI Transmission Line Reference Book: 115-345 kV Compact Line Design, The Blue Book  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines.

2008-11-05T23:59:59.000Z

464

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

465

Easing the burden of fixed telephone lines on small-scale entrepreneurs in Nigeria: GSM lines to the rescue  

Science Conference Proceedings (OSTI)

The study reported in this paper investigated the socio-economic characteristics of the adopters of GSM lines and the factors determining the adoption of GSM lines by small-scale entrepreneurs in a major Nigerian city (Ibadan). The results of the study ... Keywords: GSM lines, Nigeria, Small-scale entrepreneurs, Technology adoption

John Olatunji Adeoti; Adetola Ibidunni Adeoti

2008-02-01T23:59:59.000Z

466

Definition: Automated Feeder And Line Switching | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Automated Feeder And Line Switching Jump to: navigation, search Dictionary.png Automated Feeder And Line Switching Automated feeder and line switching is realized through automatic isolation and reconfiguration of faulted segments of distribution feeders or transmission lines via sensors, controls, switches, and communications systems. These devices can operate autonomously in response to local events or in response to signals from a central control system.[1] Related Terms transmission lines, transmission line References ↑ SmartGrid.gov 'Description of Functions' An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Automated_Feeder_And_Line_Switching&oldid=480562"

467

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland

468

Green Power Transmission Line Given New Life | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life March 11, 2010 - 4:34pm Addthis Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Stephen Graff Former Writer & editor for Energy Empowers, EERE Thanks to funds from the American Recovery and Reinvestment Act, construction of a green power transmission line stretching from Lethbridge, Alberta in Canada, down to Great Falls, Mont., was put back on track after a bank failure. Currently under construction, the Montana-Alberta Tie Line, which is owned by Toronto-based Tonbridge Power, will connect the electricity markets of

469

Proposed Project: Plains & Eastern Clean Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Proposed Project: Plains & Eastern Clean Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line's proposal was responsive to the RFP, and it is currently under consideration. The proposed Plains & Eastern Clean Line project (the proposed project) would include an overhead +/- 600 kV direct current electric transmission system and associated facilities with the capacity to deliver approximately

470

Method for bonding a transmission line to a downhole tool  

SciTech Connect

An apparatus for bonding a transmission line to the central bore of a downhole tool includes a pre-formed interface for bonding a transmission line to the inside diameter of a downhole tool. The pre-formed interface includes a first surface that substantially conforms to the outside contour of a transmission line and a second surface that substantially conforms to the inside diameter of a downhole tool. In another aspect of the invention, a method for bonding a transmission line to the inside diameter of a downhole tool includes positioning a transmission line near the inside wall of a downhole tool and placing a mold near the transmission line and the inside wall. The method further includes injecting a bonding material into the mold and curing the bonding material such that the bonding material bonds the transmission line to the inside wall.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2007-11-06T23:59:59.000Z

471

Strategy for Updating EPRI's Transmission Line Reference Book: 115-138-kV Compact Line Design ("The Blue Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a new, updated edition of the Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was originally published in 1978. The new edition will provide the most up-to-date technical information and practices on the design and maintenance of compact overhead lines. It will enable energy companies to construct cost-effective compact lines that produce optimal performances and to address the ability to maintain compact lines w...

2006-10-30T23:59:59.000Z

472

Contingency Analysis of Cascading Line Outage Events  

SciTech Connect

As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

2011-03-01T23:59:59.000Z

473

Second Line of Defense Spares Program  

Science Conference Proceedings (OSTI)

During Fiscal Year 2012, a team from the Pacific Northwest National Laboratory (PNNL) conducted an assessment and analysis of the Second Line of Defense (SLD) Sustainability spare parts program. Spare parts management touches many aspects of the SLD Sustainability Program including contracting and integration of Local Maintenance Providers (LMP), equipment vendors, analyses and metrics on program performance, system state of health, and maintenance practices. Standardized spares management will provide better data for decisions during site transition phase and will facilitate transition to host country sustainability ownership. The effort was coordinated with related SLD Sustainability Program initiatives, including a configuration items baselining initiative, a metrics initiative, and a maintenance initiative. The spares study has also led to pilot programs for sourcing alternatives that include regional intermediate inventories and partnering agreements that leverage existing supply chains. Many partners from the SLD Sustainability program contributed to and were consulted in the course of the study. This document provides a description of the findings, recommendations, and implemented solutions that have resulted from the study.

Henderson, Dale L.; Holmes, Aimee E.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.; Thorsen, Darlene E.

2012-11-20T23:59:59.000Z

474

Boron-Lined Neutron Detector Measurements  

Science Conference Proceedings (OSTI)

Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. The currently deployed radiation portal monitors (RPMs) from Ludlum and Science Applications International Corporation (SAIC) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large neutron detector. There is a declining supply of 3He in the world, and thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Four technologies have been identified as being currently commercially available, potential alternative neutron detectors to replace the use of 3He in RPMs. Reported here are the results of tests of a newly designed boron-lined proportional counter option. This testing measured the neutron detection efficiency and gamma ray rejection capabilities of a system manufactured by Reuter Stokes.

Lintereur, Azaree T.; Kouzes, Richard T.; Ely, James H.; Erikson, Luke E.; Siciliano, Edward R.

2009-11-02T23:59:59.000Z

475

Boron-Lined Neutron Detector Measurements  

Science Conference Proceedings (OSTI)

PNNL-18938 Revision Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. The currently deployed radiation portal monitors (RPMs) from Ludlum and Science Applications International Corporation (SAIC) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large neutron detector. There is a declining supply of 3He in the world, and thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Four technologies have been identified as being currently commercially available, potential alternative neutron detectors to replace the use of 3He in RPMs. Reported here are the results of tests of a newly designed boron-lined proportional counter option. This testing measured the neutron detection efficiency and gamma ray rejection capabilities of two successive prototypes of a system manufactured by GE Reuter Stokes.

Lintereur, Azaree T.; Kouzes, Richard T.; Ely, James H.; Erikson, Luke E.; Siciliano, Edward R.; Woodring, Mitchell L.

2010-03-07T23:59:59.000Z

476

Tempest gas turbine extends EGT product line  

SciTech Connect

With the introduction of the 7.8 MW (mechanical output) Tempest gas turbine, ECT has extended the company`s line of its small industrial turbines. The new Tempest machine, featuring a 7.5 MW electric output and a 33% thermal efficiency, ranks above the company`s single-shaft Typhoon gas turbine, rated 3.2 and 4.9 MW, and the 6.3 MW Tornado gas turbine. All three machines are well-suited for use in combined heat and power (CHP) plants, as demonstrated by the fact that close to 50% of the 150 Typhoon units sold are for CHP applications. This experience has induced EGT, of Lincoln, England, to announce the introduction of the new gas turbine prior to completion of the testing program. The present single-shaft machine is expected to be used mainly for industrial trial cogeneration. This market segment, covering the needs of paper mills, hospitals, chemical plants, ceramic industry, etc., is a typical local market. Cogeneration plants are engineered according to local needs and have to be assisted by local organizations. For this reason, to efficiently cover the world market, EGT has selected a number of associates that will receive from Lincoln completely engineered machine packages and will engineer the cogeneration system according to custom requirements. These partners will also assist the customer and dispose locally of the spares required for maintenance operations.

Chellini, R.

1995-07-01T23:59:59.000Z

477

Coupling Measurements in ATF2 Extraction Line  

SciTech Connect

The purpose of ATF2 is to deliver a beam with stable very small spotsizes as required for future linear colliders such as ILC or CLIC. To achieve that, precise controls of aberrations such as dispersion and coupling are necessary. Theoretically, the complete reconstruction of the beam matrix is possible from the measurements of horizontal, vertical and tilted beam sizes, combining skew quadrupole scans at several wire-scanner positions. Such measurements were performed in the extraction line (EXT) of ATF2 in May 2009. We present analysis results attempting to resolve the 4 x 4 beam matrix. We aimed to reconstruct the full beam matrix using only skew quadrupole scans at different EXT wire-scanner locations, with measurements of horizontal, vertical and two tilted beam size projections. Checking the coherence of the {sigma}{sub 13} reconstruction from the {sigma}{sub 80{sup o}} and the {sigma}{sub 100{sup o}} measurements was essential to perform this analysis. We have shown that reconstruction of the coupling element can not be performed independantly of the 4 x 4 diagonal ones since it leads to unphysical results. A more accurate and automatisable method was find, leading to physical beam matrix reconstruction, compatible with the measurements. Another analysis should be performed based on a larger number of data sets to minimise statistical errors.

Rimbault, Cecile; /Orsay, LAL; Kuroda, Shigeru; /KEK, Tsukuba; Tauchi, Toshiaki; /KEK, Tsukuba; Terunuma, Nobuhiro; /KEK, Tsukuba; White, Glen; /SLAC; Woodley, Mark; /SLAC

2012-06-29T23:59:59.000Z

478

Street Trees and Intersection Safety  

E-Print Network (OSTI)

feet is one of the standard right-of-way widths for a fourin the public right-of-way, and standards for the placementStandard Landscape Details (SD-34) for City Projects and Right-of-Way,

Macdonald, Elizabeth; Harper, Alethea; Williams, Jeff; Hayter, Jason A.

2006-01-01T23:59:59.000Z

479

EIS-0285-SA-46: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

structures, roads, and switches listed in Attachment 1. Attachment 1 identifies the Right of Way, Right of Way width,and Right of Way length of the proposed action....

480

The transcriptional diversity of 25 Drosophila cell lines  

SciTech Connect

Drosophila melanogaster cell lines are important resources for cell biologists. Here, we catalog the expression of exons, genes, and unannotated transcriptional signals for 25 lines. Unannotated transcription is substantial (typically 19% of euchromatic signal). Conservatively, we identify 1405 novel transcribed regions; 684 of these appear to be new exons of neighboring, often distant, genes. Sixty-four percent of genes are expressed detectably in at least one line, but only 21% are detected in all lines. Each cell line expresses, on average, 5885 genes, including a common set of 3109. Expression levels vary over several orders of magnitude. Major signaling pathways are well represented: most differentiation pathways are ‘‘off’’ and survival/growth pathways ‘‘on.’’ Roughly 50% of the genes expressed by each line are not part of the common set, and these show considerable individuality. Thirty-one percent are expressed at a higher level in at least one cell line than in any single developmental stage, suggesting that each line is enriched for genes characteristic of small sets of cells. Most remarkable is that imaginal discderived lines can generally be assigned, on the basis of expression, to small territories within developing discs. These mappings reveal unexpected stability of even fine-grained spatial determination. No two cell lines show identical transcription factor expression. We conclude that each line has retained features of an individual founder cell superimposed on a common ‘‘cell line‘‘ gene expression pattern. Wereport the transcriptional profiles of 25 Drosophila melanogaster cell lines, principally by whole-genome tiling microarray analysis of total RNA, carried out as part of the modENCODE project. The data produced in this study add to our knowledge of the cell lines and of the Drosophila transcriptome in several ways. We summarize the expression of previously annotated genes in each of the 25 lines with emphasis on what those patterns reveal about the origins of the lines and the stability of spatial expression patterns. We also offer an initial analysis of previously unannotated transcripts in the cell lines.

Cherbas, Lucy; Willingham, Aarron; Zhang, Dayu; Yang, Li; Zou, Yi; Eads, Brian D.; Carlson, Joseph W.; Landolin, Jane M.; Kapranov, Philipp; Dumais, Jacqueline; Samsonova, Anastasia; Choi, Jeong-Hyeon; Roberts, Johnny; Davis, Carrie A.; Tang, Haixu; van Baren, Marijke J.; Ghosh, Srinka; Dobin, Alexander; Bell, Kim; Lin, Wei; Langton, Laura; Duff, Michael O.; Tenney, Aaron E.; Zaleski, Chris; Brent, Michael R.; Hoskins, Roger A.; Kaufman, Thomas C.; Andrews, Justen; Graveley, Brenton R.; Perrimon, Norbert; Celniker, Susan E.; Gingeras, Thomas R.; Cherbas, Peter

2010-11-15T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

482

Florida Electric Transmission Line Siting Act (Florida) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Act (Florida) Electric Transmission Line Siting Act (Florida) Florida Electric Transmission Line Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection The Transmission Line Siting Act (TLSA) is the state's centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15 miles or longer. An

483

Federal Line Management Oversight of Department of Energy Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

G 226.1-2, Federal Line Management Oversight of DOE Nuclear Facilities G 226.1-2, Federal Line Management Oversight of DOE Nuclear Facilities Enforcement and Oversight HSS Home Contact Us Federal Line Management Oversight of Department of Energy Nuclear Facilities Purpose This Guide provides U.S. Department of Energy (DOE) line management organizations with guidance that may be useful to them in effectively and efficiently implementing the requirements of DOE O 226.1B, Implementation of Department of Energy Oversight Policy, dated April 25, 2011, as applied to Federal line management of hazard category 1, 2, and 3 nuclear facilities. Policy - P 226.1B, Department of Energy Oversight Policy Order - O 226.1B, Implementation of Department of Energy Oversight Policy Guide - G 226.1-2, Federal Line Management Oversight of DOE Nuclear Facilities

484

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

485

Definition: Transmission Line Monitoring System | Open Energy Information  

Open Energy Info (EERE)

Monitoring System Monitoring System Jump to: navigation, search Dictionary.png Transmission Line Monitoring System Hardware, software, including sensors for voltage, current, temperature, mechanical load, wind speed, or other electrical or environmental parameters, including synchrophasors. These systems are designed to provide precise information that determine the operating conditions and ratings of transmission lines. Such a system can monitor line conditions and alert grid operators of trouble.[1] Related Terms transmission lines, transmission line References ↑ https://www.smartgrid.gov/category/technology/transmission_line_monitoring_system [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid,

486

Hyperreal Waves on Transfinte, Terminated, Distortionless and Lossless, Transmission Lines  

E-Print Network (OSTI)

A prior work (see Chapter 8 of the book, ``Graphs and Networks: Transfinite and Nonstandard,'' Birkhauser-Boston, Cambridge, Mass., USA, 2004) examined the propagation of an electromagnetic wave on a transfinite transmission line, transfinite in the sense that infinitely many one-way infinite transmission lines are connected in cascade. That there are infinitely many such one-way infinite lines results in the wave propagating without ever reflecting at some discontinuity. The present work examines the cascade where the cascade terminates after only finitely many one-way infinite transmission lines, with the result that reflected waves are now produced at both the far end as well as at the initial end of the transfinite transmission line. The question of whether the reflected waves are infini tesimal or appreciable and whether they sum to an infinitesimal or appreciable amount are resolved for both distortionless and lossless lines. Finally, the generalizations to higher ranks of transfiniteness is briefly summarized.

A. H. Zemanian

2004-06-10T23:59:59.000Z

487

Sensor, method and system of monitoring transmission lines  

SciTech Connect

An apparatus, method, and system for measuring the magnetic field produced by phase conductors in multi-phase power lines. The magnetic field measurements are used to determine the current load on the conductors. The magnetic fields are sensed by coils placed sufficiently proximate the lines to measure the voltage induced in the coils by the field without touching the lines. The x and y components of the magnetic fields are used to calculate the conductor sag, and then the sag data, along with the field strength data, can be used to calculate the current load on the line and the phase of the current. The sag calculations of this invention are independent of line voltage and line current measurements. The system applies a computerized fitter routine to measured and sampled voltages on the coils to accurately determine the values of parameters associated with the overhead phase conductors.

Syracuse, Steven J.; Clark, Roy; Halverson, Peter G.; Tesche, Frederick M.; Barlow, Charles V.

2012-10-02T23:59:59.000Z

488

Radio frequency communication system utilizing radiating transmission lines  

DOE Patents (OSTI)

A radio communication system for use in tunnels, mines, buildings or other shielded locations in which a pair of radiating transmission lines (30), (31) extend through such location in spaced coextensive relation to each other. Each transmission line (30), (31) has at least one unidirectional amplifier (32), (33) interposed therein with the sense of the unidirectional amplifier (32) of one transmission line (30) being opposite to the sense of the unidirectional amplifier (33) of the other transmission line (31). Each of the amplifiers (32), (33) has a gain which is less than the coupling loss between the transmission lines (30), (31). Two or more mobile transceivers (35) in the location served by the system are coupled to the transmission lines (30), (31) by electromagnetic wave propagation in space in order to communicate directly with each other at a given radio frequency within the frequency range of the system.

Struven, Warren C. (San Carlos, CA)

1984-01-01T23:59:59.000Z

489

Living and Working Safely Around High-Voltage Power Lines.  

Science Conference Proceedings (OSTI)

High-voltage transmission lines can be just as safe as the electrical wiring in the homes--or just as dangerous. The crucial factor is ourselves: they must learn to behave safely around them. This booklet is a basic safety guide for those who live and work around power lines. It deals primarily with nuisance shocks due to induced voltages, and with potential electric shock hazards from contact with high-voltage lines. References on possible long-term biological effects of transmission lines are shown. In preparing this booklet, the Bonneville Power Administration has drawn on more than 50 years of experience with high-voltage transmission. BPA operates one of the world`s largest networks of long-distance, high-voltage lines. This system has more than 400 substations and about 15,000 miles of transmission lines, almost 4,400 miles of which are operated at 500,000 volts.

United States. Bonneville Power Administration.

2001-06-01T23:59:59.000Z

490

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CrystalllS-kV Transmission Line Routine Maintenance of CrystalllS-kV Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways Montrose County, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-ways (ROW) along the Curecanti-Crystal (CCI-CRY) liS-kilovolt (kV) transmission line to safely access structures 112,1/6,4/1, 6IS-6, 7/1-9, and 8/1-4 (approximately 3 miles). The project is located on private and u.s. Bureau of Land Management (BLM) lands in Montrose County, Colorado. Routine maintenance actions proposed for CCI-CRY IIS-kV transmission line include the following: I) Access road grading and improvements. A rubber-tired motor grader andlor a track dozer would

491

EIS-0285-SA-141: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Supplement Analysis 1: Supplement Analysis EIS-0285-SA-141: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Salem Albany #2 115 kV transmission line from Salem Substation to Albany Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, microwave beam paths, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

492

EIS-0285-SA-137: Supplement Analysis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Supplement Analysis 7: Supplement Analysis EIS-0285-SA-137: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Chemawa-Salem #1 115 kV and #2 230 kV transmission lines from Chemawa Substation to Salem Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, switch platforms, and around tower structures of the subject transmission line corridor that may impede the operation and maintenance of the identified transmission lines. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have lowgrowing plant communities along the rights-of-way to control the development of potentially threatening vegetation.

493

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sectionalize SPENCE-DAVE JOHNSTON 230-kV line near Casper Sectionalize SPENCE-DAVE JOHNSTON 230-kV line near Casper A. HriefDescription of Proposed Action: The Western Area Power Adminish'ation (Western), Loveland, Colorado, is responding to a request by PacifiCorp Energy (PacifiCorp) to reroute a small section of Western's Dave Johnston to Spence transmission line onto 0.8 miles of new right-of-way in the vicinity ofPacifiCorp's Casper substation. Western would own the new right- of-way acquired by PacifiCorp. The reroute would accommodate activites that PacifiCorp needs to accomplish at their substation. The line is located near Casper, Natrona County, Wyoming. Maps of the Project area are in the enclosed draft report. B. Number and Title of the Categorical Exclusion Heinl! Aoolied: (See text in 10 CFR 1021,

494

CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Zi~Fs::::N Zi~Fs::::N CATEGORICAL EXCLUSION CX DETERMINATION BRIEF DESCRIPTION OF PROPOSED ACTION: Southwestern Power Administration (Southwestern) proposes to accommodate a request, on behalf of Farrell- Cooper Mining Company, to lower and bury a small section of Southwestern's electrical lines to allow for the crossing of a large piece of mining equipment through the transmission line rights-of-way in Haskell County, Oklahoma. PROPOSED BY: Southwestern Power Administration- U.S. Dept. of Energy DATE: September 15, 2010 NUMBERS AND TITLES OF THE CATEGORICAL EXCLUSIONS BEING APPLIED: 10 CFR 1021 , Appendix B to Subpart D, Part B4.9- Grant or denial of requests for multiple use of transmission facility rights-of-way, such as grazing permits and crossing agreements, including electric lines, water lines, and

495

EIS-0483: Notice of Intent to Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Notice of Intent to Prepare an Environmental Impact 3: Notice of Intent to Prepare an Environmental Impact Statement EIS-0483: Notice of Intent to Prepare an Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO DOE's Western Area Power Administration (Western) announces their intent to prepare an EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support its decision on whether to grant a Special Use Permit for parts of the transmission line located on

496

Sagging Line Mitigator (SLiM) Full-Scale Demonstration  

Science Conference Proceedings (OSTI)

High conductor temperature operations cause excessive sag on transmission lines and thus limit ampacity. The Sagging Line Mitigator (SLiM) is a new class of transmission line hardware that fixes this problem in real time. In response to high conductor temperatures, SLiM decreases the effective length of conductor in the span. This mitigates the thermal expansion experienced by the conductor and reduces or eliminates excess sag. In this demonstration study, a preproduction SLiM device reliably reduced exc...

2005-02-22T23:59:59.000Z