Powered by Deep Web Technologies
Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Transmission Right Of Way  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About SNR > Right Of Way About SNR > Right Of Way Right Of Way Preferred Vegetation List - Redding & Foothills (XLS - 23K) Preferred Vegetation List - Sacramento Valley (XLS - 170K) WESTERN AREA POWER ADMINISTRATION GENERAL GUIDELINES CONCERNING THE USE OF ELECTRIC TRANSMISSION LINE RIGHTS-OF-WAY Western Area Power Administration (Western) owns a right-of-way easement along the length of the transmission line (width varies by transmission line). Western's rights within the easement include the right to construct, reconstruct, operate, maintain, and patrol the transmission line. Rights usually reserved to the landowner include the right to cultivate, occupy, and use the land for any purpose that does not conflict with Western's use of its easement. To avoid potential conflicts, it is Western's policy to review all proposed uses within the transmission line easement. We consider (1) Safety of the public, (2) Safety of our Employees, (3) Restrictions covered in the easement, (4) Western's maintenance requirements, and (5) Protection of the transmission line structures and (6) Road or street crossings.

2

EA-1629: Herbicide Application within Transmission Line Rights-of-Way in the Ozark-St. Francis National Forest, Arkansas  

Broader source: Energy.gov [DOE]

The Department of the Interior, U.S. Forest Service, with DOE’s Southwestern Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of applying herbicide within transmission line rights-of-way in the Ozark-St. Francis National Forest in Arkansas. NOTE: SWPA's involvement in this EA has ended.

3

EA-2002: Right-of-Way Application for the Tucson-Apache 115-kV Transmission Line, Pima County, Arizona  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) and the Bureau of Indian Affairs (BIA), as joint lead agencies, are preparing an EA that will evaluate the potential environmental impacts of a proposal for BIA to grant Western a 150-foot right-of-way across tribal land along the existing Tucson-Apache Transmission Line to replace the previous 100-foot right-of-way, which has expired.

4

Rights of Way Pesticide Training  

E-Print Network [OSTI]

Rights of Way Pesticide Training This class will provide informa on for people doing Rights of Way than 5 business days prior to training by 5:00PM. LATE CANCELLATIONS = NO REFUNDS ~ NO CREDITS ~ NO ROLLING FORWARD ~ NO EXCEPTIONS. The SBE Training Center reserves the right to cancel class due to low

Ishida, Yuko

5

5-4617-01-P1 RIGHT-OF-WAY ACQUISITION AND UTILITY  

E-Print Network [OSTI]

5-4617-01-P1 RIGHT-OF-WAY ACQUISITION AND UTILITY ADJUSTMENT PROCESS DURATION INFORMATION TOOL of Right-of-Way Acquisition and Utility Adjustment Process Duration Information Tool JULY 2008 Performing parties both sides of the R/W line have asked the question "How long does it take to acquire right of way

Texas at Austin, University of

6

Gas Companies Right-of-Way (Maryland)  

Broader source: Energy.gov [DOE]

Corporations engaged in the business of transmitting or supplying natural gas, artificial gas, or a mixture of natural and artificial gases may acquire by condemnation the rights-of-way or...

7

Science, Industry, and the Abuse of Rights of Way  

Science Journals Connector (OSTI)

...for maintenance, and for repairs. From the standpoint of vegetation...corporations include rail-roads, pipelines, electric power lines, telephone...construction, mainte-nance, and repair of the rights-of-way and...company, it was found that patches of shrubs 30 feet in diame-ter...

Frank E. Egler

1958-03-14T23:59:59.000Z

8

EA-1697: San Joaquin Valley Right-of-Way Project, California | Department  

Broader source: Energy.gov (indexed) [DOE]

97: San Joaquin Valley Right-of-Way Project, California 97: San Joaquin Valley Right-of-Way Project, California EA-1697: San Joaquin Valley Right-of-Way Project, California Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of right-of-way maintenance (including facility inspection and repair, vegetation management, and equipment upgrades for transmission lines and associated rights-or-way, access roads, substations, and a maintenance facility) in the San Joaquin Valley in California. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download December 2, 2011 EA-1697: Finding of No Significant Impact Right-of-Way Maintenance in the San Joaquin Valley, California December 2, 2011 EA-1697: Final Environmental Assessment

9

Montana - Application for Right of Way Easement for Utilities...  

Open Energy Info (EERE)

Right of Way Easement for Utilities Through State Lands Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Montana - Application for Right of Way Easement...

10

Colorado - Rights of Way on State Trust Lands - General Information...  

Open Energy Info (EERE)

LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Colorado - Rights of Way on State Trust Lands - General InformationPermittingRegulatory...

11

Montana - Right-of-Way Checklist | Open Energy Information  

Open Energy Info (EERE)

General: Montana - Right-of-Way Checklist Author Montana Department of Transportation Published Montana Department of Transportation, 2014 DOI Not Provided Check for DOI...

12

Right-of-Way for Carrier Facilities (South Dakota)  

Broader source: Energy.gov [DOE]

This legislation establishes right-of-way for carrier pipelines, as well as restrictions on the width of lands used for pipeline facilities. This legislation also applies to electricity...

13

Power Districts: Acquisition of Right-of-Way (Nebraska) | Department of  

Broader source: Energy.gov (indexed) [DOE]

Districts: Acquisition of Right-of-Way (Nebraska) Districts: Acquisition of Right-of-Way (Nebraska) Power Districts: Acquisition of Right-of-Way (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Line Extension Analysis Provider Nebraska Public Power District This statute describes procedures for power districts (utilities,

14

Landowner’s Guide for Compatible Use of BPA Rights-of-Way  

SciTech Connect (OSTI)

Keeping transmission lines safe and reliable is a critical priority for the Bonneville Power Administration. The key element in achieving those objectives is BPA’s ability to construct, operate and maintain its transmission lines and rights-of-way — the area under and around the lines. You can help BPA keep these rights-of-way clear of trees, brush and structures that could affect the safety or reliability of the transmission system. Prior to planting, digging, or constructing within BPA’s rights-of-way, fill out BPA’s Land Use Application Form. The information you provide on the application helps BPA understand your proposed use and the potential impacts to public safety, and the safety of our crews. BPA also reviews the application to determine whether a proposed use of land is compatible with the construction, operation and maintenance of BPA transmission lines. Coordinating with BPA early in your planning process can keep you safe and avoid wasting time and money.

none,

2011-02-01T23:59:59.000Z

15

Idaho Right-of-Way Encroachment Application and Permit for Utilities...  

Open Energy Info (EERE)

Idaho Right-of-Way Encroachment Application and Permit for Utilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Idaho Right-of-Way Encroachment...

16

16 U.S.C. 79: Rights-of-way for public utilities | Open Energy...  

Open Energy Info (EERE)

: Rights-of-way for public utilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: 16 U.S.C. 79: Rights-of-way for public...

17

Title 16 USC 79 Rights-of-way for Public Utilities | Open Energy...  

Open Energy Info (EERE)

Rights-of-way for Public Utilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 79 Rights-of-way for Public...

18

GRR/Section 3-WA-e - State Right of Way Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-e - State Right of Way Process GRR/Section 3-WA-e - State Right of Way Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-e - State Right of Way Process 3-WA-e - State Right of Way Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies RCW 79-36-350 RCW 79-36-520 RCW 79-36-530 Triggers None specified This flowchart illustrates the process for obtaining a right of way over state lands in Washington. The right of way process is overseen by the Washington State Department of Natural Resources (WSDNR). The right of way process is regulated under Revised Code of Washington (RCW) 79-36-350. The developer may apply for an easement, permit or license for a right of

19

GRR/Section 3-AK-b - Right of Ways (ROWs) | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-AK-b - Right of Ways (ROWs) GRR/Section 3-AK-b - Right of Ways (ROWs) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-AK-b - Right of Ways (ROWs) 03AKBRightOfWaysROWs.pdf Click to View Fullscreen Contact Agencies Alaska Department of Natural Resources Alaska Division of Mining Land and Water Regulations & Policies Alaska Statutes Alaska Administrative Code Triggers None specified Click "Edit With Form" above to add content 03AKBRightOfWaysROWs.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Alaska Division of Mining Land and Water (ML&W) oversees land use within the state and issues right of ways, easements or permit to use state

20

Colorado - C.R.S. 36-1-136 - Rights of Way Granted - Reversion...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Colorado - C.R.S. 36-1-136 - Rights of Way Granted - ReversionLegal Abstract This section...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Colorado - C.R.S. 38-5-102 - Right of Way Across State Land ...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Colorado - C.R.S. 38-5-102 - Right of Way Across State LandLegal Abstract This section address...

22

Idaho - Idaho Code 58-603 - Rights of Way Over State lands |...  

Open Energy Info (EERE)

Abstract This section covers the authority of the State Board of Land Commissioners to grant rights of way over state lands. Published NA Year Signed or Took Effect 1974 Legal...

23

Title 43 USC 1761 Grant, Issue, or Renewal of Rights-of-way ...  

Open Energy Info (EERE)

Grant, Issue, or Renewal of Rights-of-way Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 43 USC 1761 Grant, Issue, or...

24

Procedural Handbook: Grants of Easement for Right-of-Way on Indian...  

Open Energy Info (EERE)

Procedural Handbook: Grants of Easement for Right-of-Way on Indian Lands Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

25

Right-of-Way Pre-Application Checklist | Open Energy Information  

Open Energy Info (EERE)

Checklist Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Right-of-Way Pre-Application ChecklistLegal Published NA Year Signed or...

26

GRR/Section 3-FD-c - Right-of-Way Access | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-FD-c - Right-of-Way Access GRR/Section 3-FD-c - Right-of-Way Access < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-FD-c - Right-of-Way Access 03FDCRightOfWayROWAccess (2).pdf Click to View Fullscreen Contact Agencies Bureau of Land Management United States Forest Service United States Department of Transportation National Telecommunications and Information Administration Regulations & Policies NEPA Triggers None specified Click "Edit With Form" above to add content 03FDCRightOfWayROWAccess (2).pdf 03FDCRightOfWayROWAccess (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flow chart is intended to apply to lands on which a lease has not been

27

GRR/Section 3-TX-c - Highway Right of Way Lease | Open Energy Information  

Open Energy Info (EERE)

3-TX-c - Highway Right of Way Lease 3-TX-c - Highway Right of Way Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-TX-c - Highway Right of Way Lease 03TXCEncroachmentIssues.pdf Click to View Fullscreen Contact Agencies Texas General Land Office Texas Department of Transportation Regulations & Policies 43 TAC 21.600 43 TAC 21.603 43 TAC 21.606 Triggers None specified Click "Edit With Form" above to add content 03TXCEncroachmentIssues.pdf 03TXCEncroachmentIssues.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the procedure for obtaining a state highway asset lease in Texas. The Texas Department of Transportation (TxDOT) may lease any highway asset.

28

GRR/Section 3-MT-f - Right-of-Way Easement for Utilities | Open Energy  

Open Energy Info (EERE)

3-MT-f - Right-of-Way Easement for Utilities 3-MT-f - Right-of-Way Easement for Utilities < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-f - Right-of-Way Easement for Utilities 03MTFRightOfWayEasementForUtilitiesProcess.pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Montana State Historic Preservation Office Triggers None specified Click "Edit With Form" above to add content 03MTFRightOfWayEasementForUtilitiesProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart is intended to describe the process for obtaining an

29

Interior Offers First Right-of-Way for Renewable Energy Transmission in Federal Waters  

Broader source: Energy.gov [DOE]

As part of President Obama’s Climate Action Plan to create American jobs, develop clean energy sources and cut carbon pollution, Secretary of the Interior Sally Jewell and Bureau of Ocean Energy Management (BOEM) Acting Director Walter Cruickshank today announced that BOEM has offered a right-of-way (ROW) grant to Deepwater Wind Block Island Transmission System, LLC (Deepwater Wind) for the Block Island Transmission System (BITS).

30

Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study, Report to Congress  

Broader source: Energy.gov (indexed) [DOE]

Policy Act of 2005, Section 1813 Policy Act of 2005, Section 1813 Indian Land Rights-of-Way Study Report to Congress May 2007 U.S. Department of Energy U.S. Department of the Interior REPORT TO CONGRESS ENERGY POLICY ACT OF 2005, SECTION 1813 INDIAN LAND RIGHTS-OF-WAY STUDY U.S. Department of Energy U.S. Department of the Interior May 2007 Report to Congress: EPAct 2005, Section 1813, Indian Land Rights-of-Way Study i Contents Notation........................................................................................................................................... v Executive Summary ...................................................................................................................... vii 1. Introduction .............................................................................................................................

31

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

SciTech Connect (OSTI)

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the 4th quarter of 2002 included fine-tuning and debugging of the custom Optical Time Domain Reflectometer being constructed for data collection and analysis. It also included installation of optical fibers at the test site along an operating pipeline.

James E. Huebler

2003-01-29T23:59:59.000Z

32

DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS  

SciTech Connect (OSTI)

Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage would be prevented if potentially hazardous construction equipment could be detected, identified, and an alert given before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with a custom optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachments. The work performed in the 1st quarter of 2003 included fine-tuning and debugging of the custom Optical Time Domain Reflectometer being constructed for data collection and analysis. The detector was redesigned reducing the noise floor by over a factor of ten. While GTI's OTDR was being improved, a new, commercial OTDR was used to verify that the technique is capable of measuring one pound continuous force applied to the Hergalite. Optical fibers were installed at the ANR Pipeline test site along an operating pipeline.

James E. Huebler

2003-04-17T23:59:59.000Z

33

Draft Report to Congress: Energy Policy Act of 2005, Section 1813, Indian Land Rights-of-Way Study  

Broader source: Energy.gov (indexed) [DOE]

DRAFT REPORT TO CONGRESS: DRAFT REPORT TO CONGRESS: ENERGY POLICY ACT OF 2005, SECTION 1813, INDIAN LAND RIGHTS-OF-WAY STUDY U.S. Department of Energy U.S. Department of the Interior August 7, 2006 DRAFT August 7, 2006 DRAFT ii Contents 1. Introduction............................................................................................................................. 1 1.1. Statutory Language of Section 1813............................................................................... 1 1.2. Scope of Section 1813 .................................................................................................... 2 1.3. Issues Raised in Scoping the Study ................................................................................ 4 1.3.1. Tribal Sovereignty, Consent, and Self-Determination............................................

34

Development of a right-of-way cost estimation and cost estimate management process framework for highway projects  

E-Print Network [OSTI]

and difficult to address because the duration of the time span between the initiation of a project and the completion of construction often spans many years. Cost estimation of right of way (ROW) has been shown to be a specific area in which cost escalation... Engineering and Management. 2 research was conducted under Phase II of NCHRP Project 8-49, ROW Methods and Tools to Control Project Cost Escalation, which focuses specifically on cost escalation issues related to ROW. Its precursor, NCHRP Project 8...

Lucas, Matthew Allen

2009-05-15T23:59:59.000Z

35

Right of way  

Science Journals Connector (OSTI)

Pedestrian simulation can struggle with this scenario. As...7...(a). As agents approach the doorway, their ability to pass through the portal is hindered by other agents moving toward... ...

Sean Curtis; Basim Zafar; Adnan Gutub; Dinesh Manocha

2013-12-01T23:59:59.000Z

36

Results of the radiological survey at Interstate 80, North Right of Way at Lodi Brook, Lodi, New Jersey (LJ077)  

SciTech Connect (OSTI)

Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956. MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from this thorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally /sup 232/Th, derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and oil sampling for radionuclide analyses. The survey of this site, on the North Right of Way of Interstate 80 at Lodi Brook, Lodi, New Jersey (LJ077), was conducted during 1988. Results of the survey demonstrated radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions are typical of the type of material originating from the MCW site. 5 refs., 3 figs., 3 tabs.

Foley, R.D.; Floyd, L.M.

1989-06-01T23:59:59.000Z

37

Utility Lines and Facilities (Montana)  

Broader source: Energy.gov [DOE]

These regulations apply to the construction of utility and power lines and facilities. They address the use of public right-of-ways for such construction, underground power lines, and construction...

38

NEPA REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55  

Broader source: Energy.gov (indexed) [DOE]

REVIEW REVIEW LASO-10-002 CATEGORICAL EXCLUSION PAJARITO ROAD RIGHT-OF-WAY SHIFT AT TA-50 AND TA-55 1. DESCRIPTION OF PROPOSED ACTION: LANL proposes to shift a segment of Pajarito Road slightly to the south along the edge of Two-Mile Canyon in the vicinity of TA-55. The existing centerline would be moved between 36 feet and 56 feet depending on final designs. This shift would address the need to integrate security requirements related to the Chemistry and Metallurgy Building Replacement Project (CMRR) and the Nuclear Materials Safeguards and Security Upgrades Project (NMSSIJP) - specifically placement of the Perimeter Intrusion Detection, Assessment, and Delay System fence improvements in proximity to Pajarito Road. Pajarito Road is not open to the public and is secured to preclude unauthorized access to the facilities between

39

Comparison of revegetation of a gas pipeline right-of-way in two forested wetland crossings involving conventional methods of pipeline installation and horizontal drilling, Nassau County, Florida  

SciTech Connect (OSTI)

One year after pipeline installation, vegetation in the right-of-way (ROW) was inventoried at two stream floodplain crossings in Nassau County, Florida. Both sites were forested wetlands composed of Acer rubrum, Fraxinus caroliniana, Liquidamber styraciflua, Nyssa ogecho, Quercus laurifolia, and Taxodium distichum, together with other wetland trees. Pipeline installation across the Brandy Branch floodplain was by conventional ditching and backfill methods. Installation across the Deep Creek floodplain was by horizontal drilling after clearcutting the ROW. The latter method left tree stumps, understory vegetation, and soil layers intact, except for disruptions caused by logging. According to the inventory, vegetation at the drilled site was more diverse (nearly twice as many species occurring in the ROW as at the trenched site) and more robust (no unvegetated exposed soil compared to 15% at the trenched site). Differences between the ROW vegetation at the two sites can be attributed to both site differences and installation technologies used.

Van Dyke, G.D. [Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology; Shem, L.M.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

1993-10-01T23:59:59.000Z

40

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

AZ Pending Solar Right-of-Way  

E-Print Network [OSTI]

Boundary BLM National Conservation Area 0 25 50 100 Miles LEGEND USFW Service, National Wildlife Refuges USFW Service Wilderness Area Indian Lands or Reservations Private Lands State Wildlife Area Bureau 34618.36 Yuma FO AZA34540 Horizon Wind G1 CSP Trough 11495.99 Hassayampa FO AZA34554 Next Light

Laughlin, Robert B.

42

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line 9/30/02  

Broader source: Energy.gov (indexed) [DOE]

30, 30, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. Right of way width is 150 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads

43

Analysis of magnetic fields produced far from electric power lines  

SciTech Connect (OSTI)

In this paper, the authors develop a simple and general method for analyzing the magnetic fields produced by power lines at far distances, that is, at distances large in comparison to the spacing between the line's phase conductors. Magnetic fields produced far from conventional power lines have remarkably simple properties. The authors present formulae for the fields produced by various conventional and unconventional power line configurations; included are line designs characterized by reduced magnetic-field levels. Errors in the formulae are less than [plus minus]10% at the edge of a typical transmission right-of-way.

Kaune, W.T. (Enertech Consultants Campbell, CA (United States)); Zaffanella, L.E. (High Voltage Transmission Research Center, Lenox, MA (United States))

1992-10-01T23:59:59.000Z

44

Neutral reactors on shunt compensated EHV lines  

SciTech Connect (OSTI)

This paper examines the applications of a neutral reactor in limiting resonance overvoltages induced on deenergized conductors due to parallel energized circuits and stuck breaker conditions. These applications are demonstrated through the planned 243 mile long Mead-Phoenix 500 kV line running on the same right of way as the existing Mead-Liberty 345 kV line. Reducing the secondary arc current during single pole reclosing is also examined. In addition to its applications, a procedure for sizing, rating and protection of the neutral reactor is explained.

Atmuri, S.R. [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada); Thallam, R.S.; Gerlach, D.W.; Lundquist, T.G. [Salt River Project, Phoenix, AZ (United States); Selin, D.A. [Arizona Public Service Co., Phoenix, AZ (United States)

1994-12-31T23:59:59.000Z

45

Type A Accident Investigation Report on the June 25, 1997, Contractor Inspector Fatality on the Satsop-Aberdeen #2 & #3 230 kV Line  

Broader source: Energy.gov [DOE]

On June 27, 1997, I established a Type-A Accident Investigation Board to investigate the June 25, 1997 fatal contractor accident which occurred on BPA?s Satsop-Aberdeen #2 and #3 230-kV transmission lines right-of-way.

46

EIS-0442: Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah  

Broader source: Energy.gov [DOE]

This EIS is being prepared jointly by DOE’s Western Area Power Administration and the U.S. Forest Service. The EIS evaluates the potential environmental impacts of Western’s proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska.

47

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

48

CX-011831: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way CX(s) Applied: B1.3 Date: 01/29/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

49

CX-011615: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Curecanti-North Fork 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 12/02/2013 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

50

CX-007999: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration

51

CX-009709: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

52

line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

along the existing along the existing Empire-EDS 11S-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Empire-ED5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system.

53

CX-007750: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-007750: Categorical Exclusion Determination "Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a multiple use request submitted by the City of Longview, Washington, to construct a paved recreational trail (the Highland Trail) for pedestrian and bicycle use on existing BPA transmission line right-of-way in Longview, Washington. The Highland Trail would be located on existing BPA fee-owned right-of-way property along the BPA Longview-Cowlitz Number 1, 115-kilovolt (kV) transmission line corridor. It would be built within a 70-foot-wide Reserve

54

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

February 6, 2012 February 6, 2012 CX-007997: Categorical Exclusion Determination Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration February 2, 2012 CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration February 2, 2012 CX-007998: Categorical Exclusion Determination Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration

55

CX-006585: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-006585: Categorical Exclusion Determination Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside Trail CX(s) Applied: B4.9 Date: 08/25/2011 Location(s): Beaverton, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by Tualatin Hills Park and Recreation District (THPRD) to construct portions of their proposed regional trail on existing BPA transmission line right-of-way (ROW) in the City of Beaverton, Oregon. THPRD?s trail sections would be located on portions of existing BPA fee-owned right-of-way property along the BPA Keeler-Oregon City No. 2 and Oregon City Stub 115-kilovolt transmission line corridors, as well as adjacent non-BPA

56

CX-007172: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

07172: Categorical Exclusion Determination 07172: Categorical Exclusion Determination CX-007172: Categorical Exclusion Determination Tucson-Apache Erosion Repair & Cactus Relocation CX(s) Applied: B1.3 Date: 02/23/2011 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to construct a new access road along the existing Tucson-Apache 115-kilovolt (kV) transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-25/2 & 25/3- 26/5. We will be installing two gates to limit right-of-way access from Houghton Road. We

57

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

SciTech Connect (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

58

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

59

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 2270 of 26,777 results. 61 - 2270 of 26,777 results. Page Special Topics in NEPA Documentation Selected documents covering Special Topics under NEPA. http://energy.gov/nepa/special-topics-nepa-documentation Download CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007999-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3

60

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11 - 30220 of 31,917 results. 11 - 30220 of 31,917 results. Download CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007991-categorical-exclusion-determination Download CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007999-categorical-exclusion-determination Download CX-008151: Categorical Exclusion Determination

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Report to Congress: Corridors and Rights-of-Way on Federal Lands...  

Broader source: Energy.gov (indexed) [DOE]

ROWs on Federal land is held by the Forest Service (FS) of the U.S. Department of Agriculture and the Bureau of Land Management (BLM) of the U.S. Department of the Interior...

62

Interior Offers First Right-of-Way for Renewable Energy Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

BOEM is expected to hold additional competitive auctions for Wind Energy Areas offshore Massachusetts and New Jersey in the coming year. Efforts to spur responsible development...

63

Advanced Acquisition of Right-of-Way: Best Practices and Corridor Case Studies  

E-Print Network [OSTI]

an intersection. Traditional presence detection systems, ideally designed for emergency vehicles, usually send. A Bus Signal Priority System Using Automatic Vehicle Location / Global Position Systems and Wireless signal priority request after a preprogrammed time offset as soon as transit vehicles were detected

Minnesota, University of

64

Methods of right-of-way acquisition used by the Texas Highway Department  

E-Print Network [OSTI]

the acqui- sition process snd result in the public's receiving the maximum benefit per unit of expenditure. The specific ob)ectives of the study are: To inform the reader of the Texas legal authority to take pri- vate property for highway purposes... of appraisal after assignsmnt. 3. The desirability of the various means of assigning parcels of appraisal ~ 4. The adequacy of msp and other inforsmtion provided the appraiser by the Texas Highway Department. 5. The adequacy of fees paid to appraisers...

Lowry, Paul Russell

2012-06-07T23:59:59.000Z

65

Polynuclear aromatic hydrocarbons on the vegetation of a railroad right-of-way  

E-Print Network [OSTI]

exhaust emissions (LYONS, 1962). The presence of PAH in diesel exhaust emissions is well documented (KOTIN et al. , 1955; NOORE and KATZ, 1960; RECKNER et al, , 1965). Although diesel emissions are generally slight in comparison to overall air... fuel, indi cating a higher combustion efficiency in the 4-cycle engine, Engines in poor mechanical condition generally were found to be operating with incom piete combustion of fuel. This led to the production of increased quantities of soot...

Hancock, James Leonard

2012-06-07T23:59:59.000Z

66

A study of property valuation for highway right of way acquisition in Texas  

E-Print Network [OSTI]

Comsssat o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Ths TIP snd Coasequentisl or Ineidsatsl Losses . 8'Nassry ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 6$ 66 66 67 68 69 70 73 77 78 78 80 91 91 93 Vi... Comsssat o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ Ths TIP snd Coasequentisl or Ineidsatsl Losses . 8'Nassry ~ ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 4 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 6$ 66 66 67 68 69 70 73 77 78 78 80 91 91 93 Vi...

Long, James Lindsay

2012-06-07T23:59:59.000Z

67

Potential value extraction from TxDOT’s right of way and other property assets.  

E-Print Network [OSTI]

??Many Departments of Transportation (DOTs), including Texas Department of Transportation (TxDOT), have been challenged by inadequate funding from traditional federal and state fuel taxes, increasing… (more)

Paes, Thiago Mesquita

2012-01-01T23:59:59.000Z

68

Liberty-Parker No. 2 230-kV transmission line project, La Paz and Maricopa Counties, Arizona: Environmental assessment  

SciTech Connect (OSTI)

The proposed project was not found to have the potential for significant impact on the human environment. The proposed project is essentially a rebuild of an existing transmission line on an existing right-of-way (ROW) through mostly unpopulated open desert. Analysis of the proposed action and its potential effects on various environmental components showed that the project would not significantly affect climate, air quality, noise levels, topography, geology, or soils. No significant impact would occur to vegetation or wildlife as a result of the project. Visual resources will not be significantly affected, as both the existing Liberty-Parker No. 2 Transmission Line and its parallel sister No. 1 line are already present. Land ownership, land use, and socioeconomics will not be significantly affected. No significant cultural resources will be affected by the proposed project. The lines will be constructed on areas previously surveyed for cultural resources and the site density of this region is known to be very low.

Not Available

1986-09-01T23:59:59.000Z

69

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

SciTech Connect (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

70

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

61 - 1970 of 26,777 results. 61 - 1970 of 26,777 results. Download CX-005422: Categorical Exclusion Determination La Pine Chiloquin and Brasada Harney Number 1 Transmission Line Right-of-Ways CX(s) Applied: B1.3 Date: 03/15/2011 Location(s): Klamath County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005422-categorical-exclusion-determination Download Technical Standards, CFAST-Code Guidance- July 23, 2004 DOE-EH-4.2.1.4-CFAST-Code Guidance, CFAST Computer Code Application Guidance for Documented Safety Analysis http://energy.gov/hss/downloads/technical-standards-cfast-code-guidance-july-23-2004 Download CX-002690: Categorical Exclusion Determination Pajarito Road Right-Of-Way Shift at TA-50 and TA-55 CX(s) Applied: B1.13 Date: 04/21/2010 Location(s): New Mexico

71

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Broader source: Energy.gov (indexed) [DOE]

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

72

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

73

Microsoft Word - CX-NorthBonneville-RossNorthBonneville-Troutdale_LineSwap_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Civil Engineer - TEP-TPP-3 Proposed Action: North Bonneville-Ross #1 230-kV, North Bonneville-Troutdale #2 230-kV transmission line maintenance Budget Information: Work Order #00246927 PP&A Project No.: PP&A 1666 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.13 Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines approximately 20 miles in length or less to enhance environmental and land use values. Such actions include relocations to avoid right-of-way encroachments, resolve conflict with property development, accommodate road/highway construction, allow for the construction of facilities

74

CX-003232: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

32: Categorical Exclusion Determination 32: Categorical Exclusion Determination CX-003232: Categorical Exclusion Determination Ostrander-Troutdale Number 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/30/2010 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration proposes to rebuild and/or repair an existing access road and right-of-way road that provides access to the Ostrander-Troutdale Number 1 transmission line and right-of-way access for motile sites between mile/structure 10/1 to 17/3 and one site on the Big Eddy-Troutdale 63/1 ? 63/2 line. Ostrander-Troutdale Number 1 transmission line access road maintenance including grading and rocking of road surfaces and installation of water bars and cross drain culverts. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

75

CX-010110: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

10: Categorical Exclusion Determination 10: Categorical Exclusion Determination CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus Montrose (HSP-MTR) 345-kilovolt (kV) transmission line located between Montrose and Norwood, Colorado. CX-010110.pdf More Documents & Publications CX-008790: Categorical Exclusion Determination

76

CX-006296: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6296: Categorical Exclusion Determination 6296: Categorical Exclusion Determination CX-006296: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance and reconstruction activities along existing access roads, both on and off the right-of-way. The work involves approximately 4.7 miles of road reconstruction or improvement work on or leading to the Cardwell-Cowlitz No. 1, 115- kilovolt transmission line right-of-way between Cardwell Substation and structure 7/8. The roadwork is needed to improve access for crews that will be replacing the transmission line support structures within the transmission line corridor.

77

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

78

CX-003019: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

019: Categorical Exclusion Determination 019: Categorical Exclusion Determination CX-003019: Categorical Exclusion Determination Sectionalize Spence-Dave-Johnston 230-Kilovolt Line Near Casper CX(s) Applied: B4.13 Date: 05/31/2010 Location(s): Casper, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region The Western Area Power Administration, Loveland, Colorado, is responding to a request by PacifiCorp Energy to reroute a small section of Western's Dave Johnston to Spence transmission line onto 0.8 miles of new right-of-way in the vicinity of PacifiCorp's Casper substation. Western would own the new right-of-way acquired by PacifiCorp. The reroute would accommodate activities that PacifiCorp needs to accomplish at their substation. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003019.pdf

79

EIS-0285-SA-35: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Program Vegetation Management along the Chehalis-Mayfield No. 1 230 kV Transmission Line Right of Way and the Mossy Rock-Chehalis Transmission Line Right of Way,...

80

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Broader source: Energy.gov (indexed) [DOE]

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

82

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

83

Power Lines and Crops Can Be Good Neighbors  

SciTech Connect (OSTI)

Two of the Pacific Northwest’s greatest economic assets are its wealth of agriculture and its clean and reliable electricity fueled largely by hydropower. Sometimes the two intersect. Transmission lines carrying electricity to the region’s farms, businesses and homes must, of necessity, span large areas where people grow crops and orchards. To ensure a safe and reliable flow of electricity across these expanses, trees and other vegetation must be managed to certain standards. At the same time, the Bonneville Power Administration — which owns and operates three-quarters of the region’s high-voltage transmission — recognizes the importance of our region’s agricultural bounty. We are committed to working with individuals and agricultural communities to facilitate ongoing land-use activities in transmission rights-of-way as long as those uses are compatible with transmission safety and reliability standards. Our goal with vegetation management is to keep you and your property safe while protecting the reliability of our region’s electricity system. By working together, BPA and landowners can protect the system and public safety.

none,

2010-08-01T23:59:59.000Z

84

Help Line  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Help Line Help Line Ombuds Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns and want advice or referral while preserving confidentiality and anonymity. Callers may remain anonymous and the Help Line does not have caller ID or other methods of identifying callers. The Help Line maintains the same level of confidentiality and neutrality as the other Ombuds services. The Ombuds Help Line is not for reporting emergencies or officially

85

CX-003610: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

610: Categorical Exclusion Determination 610: Categorical Exclusion Determination CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to re-construct an existing access road along the Ross-Lexington Number 1 transmission line right-of-way (ROW) located in Cowlitz County, Washington. During the winter of 2008-09 a portion of the access road washed out during heavy rain, making passage impossible. The remaining portions of the road are heavily damaged and in dire need of repair. The proposed action will allow safe and timely access to the right of way which will help reduce outage times and

86

Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado. Draft environmental impact statement  

SciTech Connect (OSTI)

Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed.

Not Available

1993-05-01T23:59:59.000Z

87

Categorical Exclusion Determinations: Bonneville Power Administration |  

Broader source: Energy.gov (indexed) [DOE]

September 19, 2011 September 19, 2011 CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration September 16, 2011 CX-006820: Categorical Exclusion Determination Prosser Hatchery Storage Shed CX(s) Applied: B1.15 Date: 09/16/2011 Location(s): Prosser, Benton County, Washington Office(s): Bonneville Power Administration, Natural Gas Regulation September 16, 2011 CX-006819: Categorical Exclusion Determination Replace Aging Wood Poles on Trans Alta?s Centralia Tap to Chehalis-Covington No. 1 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/16/2011 Location(s): Lewis County, Washington

88

Establishing perennial grasses on new backslopes of a highway right-of-way during the summer months  

E-Print Network [OSTI]

) to aocelerate seedling development. The fert111sed areas of each looation were split into five equal parts. Each portion reoeived one of the following treatmentsi (1) peat 12 moss under the seeded row[ (2) scarification) (3) vegatativa mulch1 (&) a mulsh... of RC 2 asphalt ~ and (5) no further treatment vt ioh was used as a shook. Tha peat moss was plaoed beneath the seeded rov in a furrow opened using a bull-tongue at tacbsd to a manually-operated hams~arden plow, The peat moss vas soaked in water...

Waller, Jerry Jim

2012-06-07T23:59:59.000Z

89

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

90

RAPID/Roadmap/8-ID-e | Open Energy Information  

Open Energy Info (EERE)

permanent transmission facility; A description of the proposed right-of-way width for the transmission line, including to what extent a new right-of-way will be required or an...

91

CX-010425: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Pearl-Keeler Right-of-Way (ROW) Marking Project CX(s) Applied: B1.3 Date: 06/11/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

92

CX-008680: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Schultz-Raver No.1 Right-Of-Way Marking Project CX(s) Applied: B1.3 Date: 07/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration

93

Muehrcke's Lines  

Science Journals Connector (OSTI)

Figure 1. A 46-year-old woman with metastatic sarcoma who had been treated with five cycles of doxorubicin, ifosfamide, and mesna chemotherapy presented with two symmetrical, horizontal white lines on all of her fingernails but not on her toenails. A diagnosis of ...

Morrison-Bryant M.; Gradon J.D.

2007-08-30T23:59:59.000Z

94

Beau's Lines  

Science Journals Connector (OSTI)

Figure 1. A 62-year-old woman received six cycles of docetaxel chemotherapy during a six-month period for recurrent metastatic breast cancer. She had completed treatment four weeks before this photograph was taken. Six evenly spaced, transverse lines were noted on ...

Mortimer N.J.; Mills J.

2004-10-21T23:59:59.000Z

95

BEAM LINE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BEAM LINE BEAM LINE 45 W ILHELM ROENTGEN'S INITIAL DISCOVERY of X-radiation in 1895 led immediately to practical applications in medicine. Over the next few decades X rays proved to be an invaluable tool for the investigation of the micro-world of the atom and the development of the quantum theory of matter. Almost a century later, telescopes designed to detect X-radiation are indispensable for understanding the structure and evolution of the macro-world of stars, galaxies, and the Universe as a whole. The X-Ray Universe by WALLACE H. TUCKER X-ray images of the Universe are strikingly different from the usual visible-light images. 46 SUMMER 1995 did not think: I investigated." Undeterred by NASA's rejection of a proposal to search for cosmic X-radiation, Giacconi persuaded the

96

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

97

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 24540 of 31,917 results. 31 - 24540 of 31,917 results. Download CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-006818-categorical-exclusion-determination Download CX-005409: Categorical Exclusion Determination Olympia-Grand Coulee Number 1 Transmission Line CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005409-categorical-exclusion-determination Download CX-001411: Categorical Exclusion Determination Idaho Falls (IF)-608 Uninterrupted Power Supply Upgrade Project

98

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

41 - 11350 of 28,905 results. 41 - 11350 of 28,905 results. Download CX-005422: Categorical Exclusion Determination La Pine Chiloquin and Brasada Harney Number 1 Transmission Line Right-of-Ways CX(s) Applied: B1.3 Date: 03/15/2011 Location(s): Klamath County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005422-categorical-exclusion-determination Download CX-005847: Categorical Exclusion Determination Rocky Reach - Maple Valley Access Road Repair CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): King County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005847-categorical-exclusion-determination Download Audit Report: OAS-L-03-19 Audit of Recurring Acquisitions at the Chicago Operations Office http://energy.gov/ig/downloads/audit-report-oas-l-03-19

99

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 27540 of 28,904 results. 31 - 27540 of 28,904 results. Download CX-009088: Categorical Exclusion Determination Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3 Date: 08/07/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region http://energy.gov/nepa/downloads/cx-009088-categorical-exclusion-determination Download CX-009093: Categorical Exclusion Determination Knolls Laboratory Q14 Sprinkler System Upgrade Project CX(s) Applied: B1.15, B2.2 Date: 08/03/2012 Location(s): New York Offices(s): Naval Nuclear Propulsion Program http://energy.gov/nepa/downloads/cx-009093-categorical-exclusion-determination Download CX-009101: Categorical Exclusion Determination Monosodium Titanate (MST) Rheology

100

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

031 - 2040 of 9,640 results. 031 - 2040 of 9,640 results. Download CX-005422: Categorical Exclusion Determination La Pine Chiloquin and Brasada Harney Number 1 Transmission Line Right-of-Ways CX(s) Applied: B1.3 Date: 03/15/2011 Location(s): Klamath County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005422-categorical-exclusion-determination Download CX-005965: Categorical Exclusion Determination Alvey District Wood Poles: Eugene-Lane Number 1, Eugene-Alvey Number 2, and Hawkins-Alvey Number 1 CX(s) Applied: B1.3 Date: 05/20/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005965-categorical-exclusion-determination Download CX-002273: Categorical Exclusion Determination Building 961 Refurbishments (Tech Area IV)

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CX-010727: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

27: Categorical Exclusion Determination 27: Categorical Exclusion Determination CX-010727: Categorical Exclusion Determination Dayton Tap Line Retirement CX(s) Applied: B4.10 Date: 08/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to retire and remove the Dayton Tap Line (and associated components) and fund PacifiCorp's removal of associated equipment. The Dayton Tap facility was constructed within PacificCorp's transmission line right-of-way to establish a transmission line tap from PacificCorp's transmission line to a BPA customer. Since the customer will no longer be served via this tap, the Dayton Tap facility is no longer needed. CX-010727.pdf More Documents & Publications CX-003027: Categorical Exclusion Determination

102

CX-006253: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

53: Categorical Exclusion Determination 53: Categorical Exclusion Determination CX-006253: Categorical Exclusion Determination North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2 230-Kilovolt Transmission Line Maintenance CX(s) Applied: B4.13 Date: 06/14/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to conduct transmission line maintenance along a portion of the North Bonneville-Ross #1 and North Bonneville-Troutdale #2 230-kilovolt transmission lines. The maintenance activities will take place within the existing transmission line and access road right-of-way easements and includes upgrading existing roads, developing new roads, installing two new wood pole structures and two new steel tower structures.

103

CX-001121: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

121: Categorical Exclusion Determination 121: Categorical Exclusion Determination CX-001121: Categorical Exclusion Determination Transmission Line Structure Relocation of Existing Oracle-Tucson 115-kilovolt Transmission Line CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Relocate part of Oracle-Tucson 115 kilovolt transmission line in cooperation with Pima County Department of Transportation for their La Canada Drive roadway expansion. This project involves removing 17 existing transmission line pole structures, and will furnish and install 17 new monopoles in a new location within within Western's right-of-way. Western will be using existing access roads and vehicles such as an auger, pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and

104

Magnetic field exposure assessment for adult residents of Maine who live near and far away from overhead transmission lines  

SciTech Connect (OSTI)

Sixty-Hz magnetic field exposures were measured for 45 adult residents of Maine. Thirty of the subjects resided near rights-of-way (ROWs) with either 345- and 115-kV transmission lines, or ROWs with only 115-kV transmission lines; fifteen resided far from any transmission lines. Personal exposure data for a single 24-hour period was acquired with the EMDEX. The EMDEX's event-marker button was used to partition exposures into Home and Away components. Also, three area measurements were taken for each subject during the personal exposure measurement period: (1) 24-hr fixed-site bedroom measurement with a second EMDEX; (2) Spot measurements in at least three rooms of every residence; and (3) Spot measurements outside each residence. Residence near transmission lines highly loaded during the measurement period was associated with increased Home and Total exposure relative to a far-away population. Average exposure level while away from home was uniform (at about 2 mG) throughout the study population. On a quantitative level, Home exposure was correlated equivalently with Spot-In (r = .70) and the 24-hr fixed site measurement (r = .68). Correlations of area measurements with Total exposure were weaker because of the dilution effect of Away exposure (r = .64 for Spot-In; r = .61 for 24-h Bedroom). Away and Home exposures were not correlated (r = .14), which reinforced our confidence that the participants used the EMDEX correctly. The data suggest the need for caution before inferences are drawn about total personal exposure from area measurements. The study demonstrates the feasibility of obtaining valid measures of magnetic-field exposure with the personal exposure monitors that have been developed.

Kavet, R.; Silva, J.M.; Thornton, D. (Enertech Consultants, Campbell, CA (United States))

1992-01-01T23:59:59.000Z

105

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

SciTech Connect (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

106

RAPID/Roadmap/3-UT-f | Open Energy Information  

Open Energy Info (EERE)

- Utility Line Agreement All utilities located within State Highway Right of Way must enter into a license agreement with the Department. The developer should contact UDOT and...

107

EIS-0285-SA-136: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1 and 2 115 kilovolt transmission lines from Oregon City Substation to Chemawa Substation. BPA proposes to remove unwanted vegetation along the right-of-way, access...

108

CATEGORICAL EXCLUSION (CX) DETERMINATION BRIEF DESCRIPTION OF...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OF PROPOSED ACTION: Southwestern Power Administration proposes to perform aerial saw tree trimming activities along select portions of transmission line rights-of-ways located...

109

EIS-0285-SA-65: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management along the Raymond - Cosmopolis Transmission Line would include danger tree removal within some areas adjacent to the right-of-way (ROW) (May 2002) Supplement...

110

BPA, Transmission, I-5 Corridor Reinforcement Project, November...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft tower, line locations available BPA has released its preliminary designs showing tower and right-of-way locations. Information is now available online, allowing landowners to...

111

EA-1982: Parker-Davis Transmission System Programmatic Operations...  

Energy Savers [EERE]

on Western's Parker-Davis Transmission System. These actions would occur on existing transmission line and access road rights-of-way, and at substations and maintenance...

112

CX-007133: Categorical Exclusion Determination | Department of...  

Office of Environmental Management (EM)

proposes to replace crossarms at structure 536 of its Casa Grande-Saguaro 115-kilovolt transmission line, within Western's existing right-of-way. Western will access the...

113

CX-006582: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

582: Categorical Exclusion Determination 582: Categorical Exclusion Determination CX-006582: Categorical Exclusion Determination Access Road Maintenance Along the McNary-Santiam 230-Kilovolt and Jones Canyon-Santiam 230-Kilovolt Transmission Line Corridors CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the rights-of-way. The work involves approximately 5,000 linear feet of road reconstruction or improvement work. The roadwork is needed to improve access for crews that will be maintaining the transmission line and towers within the transmission line corridor. The work will consist primarily of

114

CX-007143: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7143: Categorical Exclusion Determination 7143: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using

115

CX-007131: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7131: Categorical Exclusion Determination 7131: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project.

116

CX-007366: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7366: Categorical Exclusion Determination 7366: Categorical Exclusion Determination CX-007366: Categorical Exclusion Determination Inland Power & Light 230-kilovolt Substation Project CX(s) Applied: B4.6 Date: 11/17/2011 Location(s): Washington Offices(s): Bonneville Power Administration To provide a tap point for IP&L, Bonneville Power Administration (BPA) would do the following: 1. Install two new 35-foot tall disconnect switch structures under the BPA Bell-Boundary line located about 50 feet south of tower 5/2 and 50 feet north of tower 5/5. Construction of each lattice-steel, disconnect switch structure would require four holes 6-8 feet deep in a rectangular pattern 34 feet wide (to match the lines above) by 10 feet, and would be located on BPA Right-of-Way (ROW) underneath the existing transmission line. 2. BPA may need to construct a new wood pole

117

CX-000555: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

555: Categorical Exclusion Determination 555: Categorical Exclusion Determination CX-000555: Categorical Exclusion Determination Boysen-Pilot Butte 115-kilovolt Transmission Line Vegetation Management and Access Road Maintenance CX(s) Applied: B1.3 Date: 12/02/2009 Location(s): Fremont County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to conduct vegetation management activities within the 125-foot transmission line right-of-way and perform maintenance on existing access roads along the Boysen-Pilot Butte 115-kilovolt transmission line in Fremont County, Wyoming. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000555.pdf More Documents & Publications CX-004456: Categorical Exclusion Determination CX-009801: Categorical Exclusion Determination

118

CX-003620: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

620: Categorical Exclusion Determination 620: Categorical Exclusion Determination CX-003620: Categorical Exclusion Determination Structure 57/2 Relocation on the Lovell-Thermopolis 115 Kilovolt Transmission Line CX(s) Applied: B1.3, B4.6 Date: 08/23/2010 Location(s): Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration proposes to relocate structure 57/2 on the Lovell-Thermopolis transmission line. The structure is presently located on the bank of the Greybull River, which is quickly eroding. The structure will be moved approximately 30 feet north of its present location, within the existing transmission line right-of-way. The structure is located on Wyoming State lands. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003620.pdf More Documents & Publications

119

CX-004892: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

92: Categorical Exclusion Determination 92: Categorical Exclusion Determination CX-004892: Categorical Exclusion Determination Oracle-Tucson Transmission Line Structure Relocation CX(s) Applied: B4.13 Date: 12/31/2009 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to relocate part of its Oracle-Tucson 115 kilovolt transmission line in cooperation with Pima County Department of Transportation for their La Canada Drive roadway expansion (Pima County Project Number 4LCRRI). This project involves removing 17 existing transmission line pole structures, and will furnish and install 17 new monopoles in a new location within Western's right-of-way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004892.PDF More Documents & Publications

120

CX-007143: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

43: Categorical Exclusion Determination 43: Categorical Exclusion Determination CX-007143: Categorical Exclusion Determination Empire-Electrical District 5 Double Circuit Upgrade CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230-kilovolt (kV) transmission line on its Empire-Electrical District #5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

CX-003923: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

923: Categorical Exclusion Determination 923: Categorical Exclusion Determination CX-003923: Categorical Exclusion Determination Mining Equipment Transmission Line Crossing CX(s) Applied: B4.9 Date: 09/16/2010 Location(s): Haskell County, Oklahoma Office(s): Southwestern Power Administration Southwestern Power Administration (Southwestern) proposes to accommodate a request, on behalf of Farrell Cooper Mining Company, to lower and bury a small section of Southwestern's electrical lines to allow for the crossing of a large piece of mining equipment through the transmission line rights-of-way in Haskell County, Oklahoma. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003923.pdf More Documents & Publications CX-007787: Categorical Exclusion Determination CX-007788: Categorical Exclusion Determination CX-010716

122

CX-003195: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

95: Categorical Exclusion Determination 95: Categorical Exclusion Determination CX-003195: Categorical Exclusion Determination Oracle-Tucson 115-Kilovolt Transmission Line in Pima County, Arizona CX(s) Applied: B4.13 Date: 06/10/2010 Location(s): Pima County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to relocate 5 steel monopole transmission line structures on our Oracle-Tucson 115-kilovolt transmission line to accommodate Federal Highway Administration's La Canada Road Widening Project in Tucson. This project involves removing structures 19/4, 19/11, 20/1, 20/2, 20/3, and furnishing and installing 5 new steel monopoles and foundations in a new location within Western's Right of Way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

123

CX-007131: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7131: Categorical Exclusion Determination 7131: Categorical Exclusion Determination CX-007131: Categorical Exclusion Determination Casa Grande-Empire Double Circuit Upgrade and Structure Replacement CX(s) Applied: B1.3 Date: 03/08/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to replace structures and upgrade to a double circuit 230- kilovolt (kV) transmission line on its Casa Grande-Empire 115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project.

124

Parallel Lines II: Construction of Parallel Lines  

Science Journals Connector (OSTI)

Situations are frequently encountered in which two lines, determined by linear regression, are theoretically...m 1 and m 2.

Ronald J. Tallarida Ph. D.; Rodney B. Murray Ph. D.

1987-01-01T23:59:59.000Z

125

A study of the concept of value utilized in the acquisition of homesites for right of way for Interstate Highway 20, Dallas, Texas  

E-Print Network [OSTI]

with social valuation is based primarily on certain aspects of the theory of consumer behavior. Economic activity in a complex so- ciety characterized by private enterprise is undertaken largely in re- sponse to the forces of demand as determi, ned... study of the theories of value develcped by the courts and as such, has a direct besxing on the zemun- era. zion and rules of value involved in eminent demain. l6 Thus there something more than a transf'er of ownership whi~h must be considered...

Eichman, Frank F

2012-06-07T23:59:59.000Z

126

CX-005422: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

422: Categorical Exclusion Determination 422: Categorical Exclusion Determination CX-005422: Categorical Exclusion Determination La Pine Chiloquin and Brasada Harney Number 1 Transmission Line Right-of-Ways CX(s) Applied: B1.3 Date: 03/15/2011 Location(s): Klamath County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. crossarms, insulators, guy anchors) along the subject transmission lines. Pole replacement will be in-kind and will utilize the existing holes to minimize ground disturbance. If necessary, an auger will be used to remove any loose soil from the existing hole prior to new wood pole replacement. Landing construction is not planned or anticipated at these locations.

127

CX-008790: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-008790: Categorical Exclusion Determination Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Hesperus-Montrose (HSP-MTR) 345-kilovolt (kV) transmission line to safely access structures 64, 67, 81, 82, 93, 97, 99, 100, 122, 125, and 143 (approximately 20 miles). CX-008790.pdf More Documents & Publications CX-009411: Categorical Exclusion Determination

128

CX-003218: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

18: Categorical Exclusion Determination 18: Categorical Exclusion Determination CX-003218: Categorical Exclusion Determination Renewable Energy and Energy Efficiency Revolving Loan Program RO Ranch Hydro Project CX(s) Applied: B1.15, B4.11, B5.1 Date: 08/02/2010 Location(s): Nye County, Nevada Office(s): Energy Efficiency and Renewable Energy, Golden Field Office The Nevada State Office of Energy will provide $522,000 in Recovery Act funds to Truckee River Ranch, LLC (Truckee) to install a 225 kilowatt hydropower plant and associated 2.3 mile transmission line. The hydropower portion of this work will occur at the RO Ranch, located in Nye County at T12N R42E Section 12 Northeast Southwest. The property is owned by Truckee. The approximate 2.3 miles of transmission line will follow a Right-of-Way

129

CX-009230: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

30: Categorical Exclusion Determination 30: Categorical Exclusion Determination CX-009230: Categorical Exclusion Determination Curecanti-Rifle 230 Kilovolt Transmission Line Sullivan Ranch Irrigation Water Pipeline Project Between Structures 25/5 to 26/1 CX(s) Applied: B4.9 Date: 09/28/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to grant permission to Mr. Dan Sullivan for the Sullivan Ranch Pipeline Project on Western's right-of-way (ROW) between structures 25/5 to 2611 on the Curecanti-Rifle (CCI-RFL) 230 kilovolt Transmission Line. CX-009230.pdf More Documents & Publications CX-010110: Categorical Exclusion Determination CX-010413: Categorical Exclusion Determination EIS-0442: Draft Environmental Impact Statement

130

CX-003089: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination Perform Routine Access Road Maintenance Within the Big Eddy-Ostrander Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/25/2010 Location(s): Hood River County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers approximately 1.5 miles of road. The

131

CX-003085: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

085: Categorical Exclusion Determination 085: Categorical Exclusion Determination CX-003085: Categorical Exclusion Determination Boyer-Tillamook Number 1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 06/21/2010 Location(s): Tillamook County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to rebuild and/or repair existing access road and right-of-way (ROW) road in its Eugene Region that provides access to the Boyer-Tillamook Number 1 transmission line and ROW access for sites 3, 4, 6, 7, 9, 12 and 14 between mile/structure 9/3 and 24/5. Project work includes, but is not limited to: reshaping, grading and compacting existing road surfaces and turnouts; hauling, placing, and shaping of aggregate and Riprap; constructing or reconditioning of water

132

CX-006583: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-006583: Categorical Exclusion Determination Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration Maintenance activities will take place within the existing transmission line right-of-way easement and include upgrading existing access roads, relocating or constructing short spur roads to structures, constructing equipment landings and performing maintenance on structures. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006583.pdf More Documents & Publications CX-006580: Categorical Exclusion Determination CX-010424: Categorical Exclusion Determination

133

CX-008380: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

80: Categorical Exclusion Determination 80: Categorical Exclusion Determination CX-008380: Categorical Exclusion Determination Archer to Ault 230 Kilovolt Transmission Line Structure Replacement, Weld County, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to replace an existing three pole wood structure along the Archer to Ault 230 kilovolt (kV) transmission line. The structure is located on private land adjacent to County Road 27 northwest of the town of Nunn in Weld County, Colorado. The structure will be replaced in-kind with wood poles of the same height, hardware, configuration, and at the same location. All work will be confined to Western's right-of way easement.

134

CX-006794: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-006794: Categorical Exclusion Determination Naselle-Tarlett Nature Conservancy Access Road Funding CX(s) Applied: B1.13 Date: 09/12/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration In 2010, the Nature Conservancy (property owner), in accordance to agreements with Bonneville Power Administration (BPA), abandoned several sections of legal and usable access roads leading to BPA?s Nasselle-Tarlett 115-kilovolt transmission line corridor. The Nature Conservancy has constructed new, more environmentally friendly sections of access roads on their property to provide BPA alternate access the transmission line right-of-way and structures. BPA proposes to purchase easement rights and provide funding to partially cover construction costs of the new road

135

CX-007991: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

991: Categorical Exclusion Determination 991: Categorical Exclusion Determination CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission lines. Microsoft Word - CX-Drummond-MacksInn_WoodPoleReplacementFY12_WEB.doc More Documents & Publications CX-009709: Categorical Exclusion Determination EIS-0267: Final Environmental Impact Statement EIS-0285-SA-82: Supplemental Analysis

136

CX-008714: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8714: Categorical Exclusion Determination 8714: Categorical Exclusion Determination CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace 18 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) as well as cross arms on three other structures along the subject transmission lines. Microsoft Word - CX-Alvey-FairviewAlvey-MartinCreek-DrainWoodPolesFY12_WEB.doc More Documents & Publications CX-010344: Categorical Exclusion Determination

137

CX-000833: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

33: Categorical Exclusion Determination 33: Categorical Exclusion Determination CX-000833: Categorical Exclusion Determination Flaming Gorge-Vernal Number 3 Transmission Line Vegetation Management, Uintah County, Utah CX(s) Applied: B1.3 Date: 01/22/2010 Location(s): Uintah County, Utah Office(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration proposes to cut trees in the existing transmission line right-of-way between structures 32/2 to 35/6 and 36/4 to 39/3. This approximately 6.3 mile section is located on private land in Uintah County, east of Vernal, Utah in T4S, R21E, sections 12, 13; T4S, R22E, sections 18, 19, and 20; T5S, R22E, sections 5 and 8 of the Salt Lake Meridian. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000833.pdf More Documents & Publications

138

CX-006300: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

00: Categorical Exclusion Determination 00: Categorical Exclusion Determination CX-006300: Categorical Exclusion Determination Murray Hill Recreation Association Permission to Cross Keeler-Oregon City Transmission Line CX(s) Applied: B4.9 Date: 07/21/2011 Location(s): Washington County, Oregon Office(s): Bonneville Power Administration The Murray Hill Recreation Association has requested permission to cross the Bonneville Power Administration (BPA) right-of-way under the Keeler-Oregon City and Oregon City Stub corridor in order to access the rear of their sports complex to conduct periodic maintenance. The current project proposes to stockpile sand and transport it along an existing roadway beneath the lines to the athletic fields on their complex. The proposal further requests permission to access their complex two-to-three

139

CX-007167: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

167: Categorical Exclusion Determination 167: Categorical Exclusion Determination CX-007167: Categorical Exclusion Determination Rogers-Coolidge Danger Tree Removal CX(s) Applied: B1.3 Date: 02/18/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to cut down four Palo Verde trees using hand tools, under our existing Rogers-Coolidge 230-kilovolt transmission line, within Western's existing right-of-way between Structures 35/4 and 36/2 on the Gila River Indian Reservation, Pinal County, Arizona. Western will be using pickup trucks along the existing access road located west of the transmission line to bring personnel and equipment to the work areas. This work is necessary to maintain the safety and reliability of the bulk

140

CX-001489: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-001489: Categorical Exclusion Determination Fort Randall-Sioux City Hazard Tree and Vegetation Control/Removal CX(s) Applied: B1.3 Date: 03/29/2010 Location(s): Sioux City, Iowa Office(s): Western Area Power Administration-Upper Great Plains Region Western Area Power Administration (WAPA) proposes to remove hazardous trees and other woody vegetation within 30 feet of the transmission line conductor, or that could fall within 30 feet of the conductor, on WAPA's existing Fort Randall-Sioux City 230 kilovolt transmission line right-of-way between structures 107/4 and 109/5. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-001489.pdf More Documents & Publications CX-007166: Categorical Exclusion Determination CX-010105: Categorical Exclusion Determination

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

CX-005410: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

410: Categorical Exclusion Determination 410: Categorical Exclusion Determination CX-005410: Categorical Exclusion Determination North Bonneville-Alcoa Number 1 and 2 Transmission Line Corridor CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road reconstruction work to improve vehicle access to structures 16/6, 16/7 and 17/1 of the North Bonneville-Alcoa Number 1 and 2 transmission line corridor from southeast 37th Street to the right-of-way, then to structure 16/6 to the east, and structure 17/1 to the west. The total distance of this project is approximately 2200 feet. Project work may include, but is not limited to: vegetation removal to clear a 20-foot width, grading and

142

CX-001180: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1180: Categorical Exclusion Determination 1180: Categorical Exclusion Determination CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace an existing dilapidated bridge across Little Pilchuck Creek, install three culverts in drainage ditches near the bridge, and repair 2,000 feet of existing on and off right-of-way (ROW) access roads along mile 16 of the Monroe-Custer Number 1 and Number 2 transmission Lines. Project work includes: excavation for bridge removal and installation, grading and shaping of roads, placing

143

CX-003090: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off (Ha-o-AR-125-1, 125-2, BC-AR-32) the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers

144

CX-006575: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6575: Categorical Exclusion Determination 6575: Categorical Exclusion Determination CX-006575: Categorical Exclusion Determination Fairview-Rogue Access Road Maintenance Project CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Coos County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road maintenance activities along the access roads of the BPA Fairview-Rogue 230-kilovolt transmission line between Fairview Substation and State Highway 42. Approximately 8,800 feet of selected roads, which lay on and off of the BPA right-of-way (ROW), will be maintained as part of the proposed project. The proposed access road project is part of on-going operations and maintenance along this line and this work is proposed for 2011. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

145

CX-005846: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

846: Categorical Exclusion Determination 846: Categorical Exclusion Determination CX-005846: Categorical Exclusion Determination Wood Pole Replacement and Minor Access Road Maintenance Along Various Transmission Line Rights-Of-Way in the Wenatchee District CX(s) Applied: B1.3 Date: 05/04/2011 Location(s): Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission line. Replacement will be in-kind and will utilize the existing holes to minimize ground disturbance. If necessary, an auger will be used to remove any loose soil from the existing hole prior to new wood pole placement. New landing construction is not planned or anticipated at these locations.

146

CX-005852: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

852: Categorical Exclusion Determination 852: Categorical Exclusion Determination CX-005852: Categorical Exclusion Determination Stegall-Wayside 230 Kilovolt Access Road Extension CX(s) Applied: B1.13 Date: 05/05/2011 Location(s): Dawes County, Wyoming Office(s): Western Area Power Administration-Rocky Mountain Region Western Power Administration plans to construct an extension of an existing access road between structures 111-1 and 111-2 on the Stegall-Wayside 230 kilovolt transmission line. This road construction will provide access for removal of previously felled hazard trees along the transmission line right-of-way on private land. The project will extend the existing access road to the south from its present terminus at structure 111-1 and terminate before reaching structure 111-2. DOCUMENT(S) AVAILABLE FOR DOWNLOAD

147

North Australian Cloud Lines  

Science Journals Connector (OSTI)

A satellite classification and climatology of propagating mesoscale cloud fines in northern Australia is presented. These cloud fines range from long, narrow lines of shallow convection to extensive deep convective squall lines with mesoscale ...

W. Drosdowsky; G. J. Holland

1987-11-01T23:59:59.000Z

148

CX-004889: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-004889: Categorical Exclusion Determination Casa Grande-Empire (Geological Boring) CX(s) Applied: B3.1 Date: 08/19/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western Area Power Administration proposes to do geologic boring within our right-of-way at structures 18/2, 21/2, 25/1, 37/5, and 41/5 along the existing Casa Grande-Empire 115 kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-004889.pdf More Documents & Publications CX-007130: Categorical Exclusion Determination

149

CX-007170: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

70: Categorical Exclusion Determination 70: Categorical Exclusion Determination CX-007170: Categorical Exclusion Determination Saguaro-Tucson Vegetation Removal CX(s) Applied: B1.3 Date: 03/30/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to remove vegetation under its existing Saguaro-Tucson 115-kilovolt transmission line, within Western's existing right-of-way between Structures 5/3 and 6/3 in Pinal County, Arizona. We plan on using existing access roads to the vegetation removal areas. Western will be using a front-end loader with a cutting & shredding attachment to remove the vegetation. This work is necessary to maintain the safety and reliability of the bulk electrical system. CX-007170.pdf More Documents & Publications

150

CX-007169: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

169: Categorical Exclusion Determination 169: Categorical Exclusion Determination CX-007169: Categorical Exclusion Determination Saguaro-Oracle Vegetation Removal CX(s) Applied: B1.3 Date: 04/07/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to conduct vegetation removal between structures 0/3 and 0/4, 1/5 and 1/6, 3/1 and 3/2, 4/2 and 4/3, around structure 4/8, between structures 5/1 and 5/2 and around structure 5/4 of its Saguaro-Oracle 115- kilovolt transmission line, within Western's existing right-of-way. Western will access the vegetation removal areas using crew trucks along the existing access roads. Western will use a front end loader with a cut shredder attachment to knock down and chip wood vegetation. The debris will

151

Categorical Exclusion Determinations: B4.12 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 2 Categorical Exclusion Determinations: B4.12 Existing Regulations B4.12: Construction of powerlines Construction of electric powerlines approximately 10 miles in length or less, or approximately 20 miles in length or less within previously disturbed or developed powerline or pipeline rights-of-way. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD July 25, 2013 CX-010577: Categorical Exclusion Determination Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington

152

CX-007515: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

15: Categorical Exclusion Determination 15: Categorical Exclusion Determination CX-007515: Categorical Exclusion Determination Bucknam Temporary Tap, Natrona County, Wyoming CX(s) Applied: B4.6 Date: 12/15/2011 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration is entering into an agreement with Tri-State Generation and Transmission to provide a temporary tap with mobile equipment to be placed until a facility study can be done for permanent construction. This Categorical Exclusion is for the installation of a temporary mobile transformer within Western's right of way (ROW) easement on Bureau of Land Management land along the Casper-Arminto 115 kilovolt transmission line 50 feet north of structure 23/8. The project will require a temporary tap, pad location, temporary fencing around the

153

CX-007811: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11: Categorical Exclusion Determination 11: Categorical Exclusion Determination CX-007811: Categorical Exclusion Determination "Decommission Ground Water Monitoring Well Located on Bonneville Power Administration (BPA) Fee-owned Property CX(s) Applied: B3.1 Date: 12/14/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to allow Seattle City Light access to a BPA fee-owned right-of-way (ROW) for the purpose of decommissioning a Seattle City Lightowned well. Seattle City Light historically installed ground water monitoring wells as part of the Boundary Dam licensing process in the 1950s and 1960s to study the impact of the Dam on ground water levels. One of these wells exists on BPA fee-owned ROW approximately 650 feet ahead-on-line from tower 107/1 [Ref

154

CX-003236: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

36: Categorical Exclusion Determination 36: Categorical Exclusion Determination CX-003236: Categorical Exclusion Determination Augspurger Fiber Replacement Project CX(s) Applied: B1.7, B4.7 Date: 07/21/2010 Location(s): Skamania County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to bury approximately 7 miles of existing aerial fiber along the North Bonneville-Midway #1 transmission line right-of-way (ROW) between towers 12/4 and 20/1. The existing aerial fiber would be replaced with two reels of 72-strand loose tube fiber optic cable (maximum reel length is 39,370 feet). Two 2-inch diameter High Density Poly Ethylene conduits would be buried approximately 48 inches below ground. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003236.pdf More Documents & Publications

155

CX-010147: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Categorical Exclusion Determination 7: Categorical Exclusion Determination CX-010147: Categorical Exclusion Determination Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 04/19/2013 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kV transmission line corridor in the City of Beaverton, Oregon. Microsoft Word - CX_Memo_Amended_TVWD.docx More Documents & Publications CX-009697: Categorical Exclusion Determination CX-009701: Categorical Exclusion Determination CX-010145

156

CX-009701: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

701: Categorical Exclusion Determination 701: Categorical Exclusion Determination CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to grant a Land Use Review Request (LURR) submitted by Williams Northwest Pipeline (WNP) to replace a portion of their 10-inch diameter South Seattle 2454 loop natural gas pipeline within their existing easement on BPA fee-owned right-of-way (ROW) within BPA's Maple Valley-Echo Lake transmission line corridor in King County, Washington. CX-009701.pdf More Documents & Publications CX-008680: Categorical Exclusion Determination EIS-0317-S1: Draft Supplemental Environmental Impact Statement

157

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21, 2011 21, 2011 CX-007750: Categorical Exclusion Determination Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration December 16, 2011 Cows like these in Skagit County, Washington, supply the biodigester developed by Kevin Maas of Farm Power up to 70,000 gallons of manure per day. The newest Farm Power facility in Washington generates enough electricity to power 500 homes. Photo courtesy of sea_turtle. Farming Out Heat and Electricity through Biopower The newest biodigester at the Farm Power facility in Washington generates electricity from biogas created from bacteria's anaerobic digestion of cow

158

CX-007139: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

39: Categorical Exclusion Determination 39: Categorical Exclusion Determination CX-007139: Categorical Exclusion Determination Electrical District 2- Electrical District 5 Geological Boring CX(s) Applied: B3.1 Date: 05/16/2011 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to do geologic borings within our right-of-way near structures 21/5, 22/5, 23/6, 25/4, 26/5, 27/6, 28/5, 29/5 & 30/4 along the existing electrical district (ED) #2-ED5 230-kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring

159

CX-003352: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

352: Categorical Exclusion Determination 352: Categorical Exclusion Determination CX-003352: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant Oklahoma Department of Commerce #6, City of Wynoka CX(s) Applied: B4.13, B5.1 Date: 08/13/2010 Location(s): Wynoka, Oklahoma Office(s): Energy Efficiency and Renewable Energy, Golden Field Office The City of Wynoka, Oklahoma is proposing to use $250,000 of Energy Efficiency and Conservation Block Grant funding for the City Electrical System Upgrade Project which will involve the retrofitting of approximately 49 existing transformers and electrical poles. All work will be done within the existing transmission line right-of-way (ROW). DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-003352.pdf More Documents & Publications CX-009745: Categorical Exclusion Determination

160

CX-006791: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6791: Categorical Exclusion Determination 6791: Categorical Exclusion Determination CX-006791: Categorical Exclusion Determination Big Eddy-Chemawa Utility Pole Installation for City of Wilsonville Kinsman Road/Barber Street Extension CX(s) Applied: B4.6 Date: 09/09/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to add one steel pole onto its 230 kilovolt Big Eddy-Chemawa transmission line at the sag between towers 94/2 and 94/3. The addition is to accommodate a City of Wilsonville road project, the Kinsman Road and Barber Street extension projects. All work will be conducted by BPA crews within previously disturbed soils along the existing right-of-way. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-006791.pdf More Documents & Publications

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

CX-007130: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

30: Categorical Exclusion Determination 30: Categorical Exclusion Determination CX-007130: Categorical Exclusion Determination Casa Grande-Empire CX(s) Applied: B3.1 Date: 09/14/2010 Location(s): Pinal County, Arizona Office(s): Western Area Power Administration-Desert Southwest Region Western proposes to do geologic borings within our right-of-way near structures 18/5, 19/6, 21/2, 2317, 26/4, 28/4, 36/1, 37/5, 39/4 and 41/4 along the existing Casa Grande-electrical district #5 115-kilovolt transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas.

162

CX-000330: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

30: Categorical Exclusion Determination 30: Categorical Exclusion Determination CX-000330: Categorical Exclusion Determination West Virginia Revision 1 - Energy Efficiency in State Buildings: Corrections - Project 1 Huttonsville Correctional Center CX(s) Applied: B1.31, B2.5, B5.1, B5.4, B5.5 Date: 12/02/2009 Location(s): Huttonsville, West Virginia Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory Replacement of oil-fired boiler with new natural gas boiler; upgrade of 7 miles of existing 4 inch natural gas pipe line with 8 inch pipeline in existing right-of-way; 0.6 mile of new pipeline across prison property. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-000330.pdf More Documents & Publications CX-000324: Categorical Exclusion Determination CX-000312: Categorical Exclusion Determination

163

CX-004876: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4876: Categorical Exclusion Determination 4876: Categorical Exclusion Determination CX-004876: Categorical Exclusion Determination Casa Grande-Empire (Double Circuit Upgrade) CX(s) Applied: B4.13 Date: 09/15/2010 Location(s): Pinal County, Arizona Office(s): Bonneville Power Administration Western proposes to work with Salt River Project on an upgrade to a double circuit on its Casa Grande-Empire 115 kilowatt transmission line. This project involves the removal of the existing H-frame wooden structures and the installation of new steel monopole structures. This will require auger trucks, bulldozers, bucket trucks and cranes. Existing access roads and the existing right-of-way will be used for vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the

164

CX-005847: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

847: Categorical Exclusion Determination 847: Categorical Exclusion Determination CX-005847: Categorical Exclusion Determination Rocky Reach - Maple Valley Access Road Repair CX(s) Applied: B1.3 Date: 05/05/2011 Location(s): King County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to build and/or repair approximately 18,000 feet of access road and right-of-way road that provides access to the Rocky Reach-Maple Valley Number 1 transmission line in King County, Washington. The work is necessary to repair damage done to access roads caused by a major flood event that occurred on November 7, 2006, and thus provide continued system stability. The project includes but is not limited to: - Reconstruction (blading, reshaping, grading, and compacting) of existing road surfaces - Hauling, placing, and shaping of

165

Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California  

SciTech Connect (OSTI)

The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

Not Available

1994-10-01T23:59:59.000Z

166

Germ-line Allele  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Germ-line Allele Germ-line Allele Name: Rachel Location: N/A Country: N/A Date: N/A Question: Can you please explain a "germ-line allele" to me! It is very important for a research paper I am writing about breast cancer. Replies: Mutations in genes are only able to be passed to the offspring if they are found in gametes (egg, sperm) mutations that occur in body cells other than gametes are usually not important because the cells can be replaced and they die eventually. The only way a characteristic can be passed to the offspring is through the eggs and sperm, so if there is a mutation in one these cells, the offspring can inherit the mutation. So a germ-line cell is a gamete. And a germ line allele is a version of the trait that is passed to the offspring through the germ line cell (or gamete).

167

EIS-0285-SA-55: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Raver - Paul No. 1 Transmission Line ROW from structure 155 to 293. The transmission line is a 500 kV line. BPA proposes to clear unwanted vegetation in the rights-of- ways and...

168

CX-008789: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

89: Categorical Exclusion Determination 89: Categorical Exclusion Determination CX-008789: Categorical Exclusion Determination Routine Maintenance of Curecanti-Lost Canyon 230 Kilovolt Access Roads and Western Area Power Administration Right-of-Way in Montrose, Ouray, San Miguel, Dolores, and Montezuma Counties, Colorado CX(s) Applied: B1.3 Date: 05/22/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine maintenance of existing access roads and right-of-way (ROW) along the Curecanti-Lost Canyon (CCI-LCN) 230-kilovolt (kV) transmission line at structures 0/2 to 1/3, 3/2, 8/1, 8/6, 9/6 to 9/7, 12/2 to 14/2, 15/5, 17/2, 17/3, 36/5, 37/1, 43/2, 47/2, 47/4, and 56/4 (approximately 60 miles).

169

Nematostatics of triple lines  

Science Journals Connector (OSTI)

The Landau–de Gennes model for nematic liquid crystal bulk and interfaces has been extended to nematic triple lines involving the intersection of two isotropic fluids and one nematic liquid crystalline phase. A complete set of bulk, interface, and triple line force and torque balance equations has been formulated. The triple line force and torque balance equations have linear, interfacial, and bulk contributions. The bulk contributions appear as junction integrals, the surface contributions as junctions sums, and the line contributions as gradients of stresses. Reduction of dimensionality from three to one dimensional creates the following effects: (a) bulk terms enter interfacial balances as surface jumps and line balances as junction integrals, and (b) surface terms enter linear balances as junction sums. Line stress and torque equations are derived using classical liquid crystal models. The correspondence between line stress and line torque and their surface and bulk analogs is established. The triple line force and torque balance equations are use to analyze the contact angle in a nematic lens lying at the interface between two isotropic fluids, when the prefered surface orientation is tangential. The effect of anisotropy and long range elasticity on triple line phases is established. Under weak anchoring the contact angle is shown to be a function of the anchoring energy at the nematic-isotropic interface, while under strong anchoring conditions the contact angle is a function of the Peach-Koehler force that originates from bulk long range elasticity and acts on the triple line. The use of the complete set of balance equations removes the classical inconsistency in force balances at a contact line by properly taking into account long range (bulk gradient elasticity) and anisotropic (interfacial anchoring elasticity) effects.

Alejandro D. Rey

2003-01-30T23:59:59.000Z

170

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

171

Categorical Exclusion Determinations: B1.13 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21, 2010 21, 2010 CX-002690: Categorical Exclusion Determination Pajarito Road Right-Of-Way Shift at TA-50 and TA-55 CX(s) Applied: B1.13 Date: 04/21/2010 Location(s): New Mexico Office(s): Los Alamos Site Office April 2, 2010 CX-006727: Categorical Exclusion Determination Weirbox Installation CX(s) Applied: B1.6, B1.13, B2.5, B3.1, B5.4, B6.3 Date: 04/02/2010 Location(s): Casper, Wyoming Office(s): RMOTC March 31, 2010 CX-001386: Categorical Exclusion Determination Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing Bridge CX(s) Applied: B1.13, B1.3 Date: 03/31/2010 Location(s): Spokane County, Washington Office(s): Bonneville Power Administration March 24, 2010 CX-001206: Categorical Exclusion Determination Tehachapi Wind Energy Storage

172

Geodesic Lines, . . . Covariant . . .  

E-Print Network [OSTI]

Geodesic Lines, . . . Covariant . . . Home Page Title Page Page 781 of 818 Go Back Full Screen Close Quit 14.11. Geodesic Lines, Local Gauss-Bonnet Theorem Geodesics play a very important role in surface theory and in dynamics. One of the main reasons why geodesics are so important

Gallier, Jean

173

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

174

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

175

CX-011834: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Ellensburg-Moxee No. 1 Right-Of-Way (ROW) Geotechnical Exploration Between Structures 17/1-22/2 CX(s) Applied: B4.7 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration

176

Holes in Spectral Lines  

E-Print Network [OSTI]

The decay of an atom in the presence of a static perturbation is investigated. The perturbation couples a decaying state with a nondecaying state. A "hole" appears in the emission line at a frequency equal to the frequency ...

Fontana, Peter R.; Srivastava, Rajendra P.

1973-06-01T23:59:59.000Z

177

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

178

Lifting by Convergence Lines  

Science Journals Connector (OSTI)

The lifting depth of a convergence line in an unstratified boundary layer beneath a stably stratified atmosphere is examined with both analytical and numerical models. Cases are considered with and without flow in the layer above the convergence ...

N. Andrew Crook; Joseph B. Klemp

2000-03-01T23:59:59.000Z

179

Line tension vector thermodynamics of anisotropic contact lines  

Science Journals Connector (OSTI)

Multiphase materials with intersecting diving surfaces give rise to contact lines. A line tension vector thermodynamics formalism is developed and used to analyze contact line problems in the presence of anisotropy, taking into account two elastic modes: change in contact line length and change in contact line orientation. Using this formalism, the contact line-shape equation is derived, and the renormalization of the line tension due to anisotropy is characterized. The correspondence and analogies between the shape equation for anisotropic surfaces (Herring equation) and the shape equation for contact lines is established. Line energies for nematic liquid crystals, representative of generic anisotropic contact lines, are used to derive a shape equation that takes into account ambient orientation effects. It is found that anisotropic line tension may promote bending and chiral modes to avoid unfavorable orientations of the contact line with respect to the ambient nematic ordering.

Alejandro D. Rey

2004-04-30T23:59:59.000Z

180

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Broader source: Energy.gov (indexed) [DOE]

New Construction of Distribution Lines, Service Lines, and New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Environmental Regulations Provider New York State Public Service Commission Any proposed construction of distribution lines, service lines, and appurtenant facilities to electric utilities located near scenic areas of

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EIS-0285-SA-57: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Program Vegetation Management along the Trojan-Allston Transmission Lines 1 and 2 Right Of Ways between 11 and 91. The lines are 230 kV Single Circuit...

182

EIS-0285-SA-149: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Program Vegetation Management for the Captain Jack-Malin 1 500 kV transmission line from structure 24 to Malin Substation (reference line). Right of way width...

183

Apparent ridges for line drawing  

E-Print Network [OSTI]

Non-photorealistic line drawing depicts 3D shapes through the rendering of feature lines. A number of characterizations of relevant lines have been proposed but none of these definitions alone seem to capture all ...

Judd, Tilke (Tilke M.)

2007-01-01T23:59:59.000Z

184

Harry: Between the Lines  

E-Print Network [OSTI]

I 5. ; ..v^-rr>.>-'- j??!*f fefi ( -??;r' ,, ;rl&.i:-??t**rK&d t ? -?, .- 'c-y. ~ :'y$???M .'??. ??.v-'-/i / ' , *? I te / - 5- MAGNUM FORCE: HARRY Between The Lines by Ruth Kurz Seeing Harry, instead of The Callahan... Image. (1973) Special thanks to Teri White for the original "first time"*scene. Further thanks JL MW AW DMc A production of AD NAUSEUM PRESS 3613 West Park Road Cleveland, Ohio 44111 MAGNUM FORCE: HARRY Between The Lines by ruth kurz ' "I...

Kurz, R.; White, T.

1982-01-01T23:59:59.000Z

185

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

186

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

187

Scha's Parallel Lines Bernhard Nickel  

E-Print Network [OSTI]

Scha's Parallel Lines Bernhard Nickel May 10, 2010 1 Introduction Scha (1981) has a famous example) The single lines run parallel to the double lines. 3 Code for Figure 1 \\begin{figure} \\centering \\setlength{\\unitlength}{.5in} \\begin{picture}(6,4) % first square \\put(0,4){\\line(1,0){4}}% \\put(0,1){\\line(1,0){4}}% \\put(0

Nickel, Bernhard

188

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

189

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Broader source: Energy.gov (indexed) [DOE]

Construction of Distribution Lines, Service Lines, and Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) < Back Eligibility Commercial Installer/Contractor Institutional Investor-Owned Utility Low-Income Residential Multi-Family Residential Municipal/Public Utility Residential Rural Electric Cooperative Schools Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Home Weatherization Water Buying & Making Electricity Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any proposed construction of electricity-related facilities in residential

190

New Imperial Valley power line  

SciTech Connect (OSTI)

The Imperial Irrigation District placed its new 104-mile, 230kV transmission line in service in the Imperial Valley on September 14, 1988. The power line, with a rated capacity of 600 megawatts, transmits electricity generated at geothermal power plants. The transmission line was financed by 14 geothermal companies, whose participation was based on the amount of line-capacity they expect to use.

Not Available

1988-12-01T23:59:59.000Z

191

a 115-line MATLAB implementation  

E-Print Network [OSTI]

Apr 15, 2013 ... Alternating active-phase algorithm for multimaterial topology optimization problems -- a 115-line MATLAB implementation. Rouhollah Tavakoli ...

Rouhollah Tavakoli

2013-04-15T23:59:59.000Z

192

Transmission Line Circuit Alexander Glasser  

E-Print Network [OSTI]

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

193

CORONAL EMISSION LINES AS THERMOMETERS  

SciTech Connect (OSTI)

Coronal emission-line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G., E-mail: judge@ucar.ed [High Altitude Observatory, National Center for Atmospheric Research , P.O. Box 3000, Boulder CO 80307-3000 (United States)

2010-01-10T23:59:59.000Z

194

Why Neutrino Lines are Hypersharp  

E-Print Network [OSTI]

It was recently pointed out that mono-energetic neutrino lines from the 2-body decay of tritium (tau ~ 18-y) can be emitted, a significant fraction, with natural line width (~10-24 eV) for hypersharp resonance transitions 3H--> line broadening in resonances of short lived (tau ~ microsec) states.

R. S. Raghavan

2009-08-20T23:59:59.000Z

195

Coronal emission lines as thermometers  

E-Print Network [OSTI]

Coronal emission line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G

2009-01-01T23:59:59.000Z

196

APPLICATION OF A CATEGORICAL EXCLUSION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

operation and maintenance of a four inch pressurized sanitary sewer line on PORTS land along the existing roadway right-of-way to the existing X-6619 waste water...

197

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

114 and 115 on the Lovell-Yellowtail No. 1 115-kV Transmission Line right-of-way (ROW). The culvert was identified as deficient and in need of repair during a routine...

198

SPECIES PROFILE New Hampshire Wildlife Action PlanA-602  

E-Print Network [OSTI]

, clearings, regenerating clear cuts, recent burns, and power line rights of way (Wilson 2003). Dry soil to occur in areas identified by aerial photography as "dry pine forest," "gravel pit," or "disturbed

New Hampshire, University of

199

BPA's Vegetation Management Program - Fact Sheet - May 2006  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and encroachments that could hinder BPA's ability to access and maintain its lines. BPA manages the vegetation on and near its rights-of-way to keep people safe and the system...

200

EIS-0285-SA-26: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Vegetation Management on Reedsport-Fairview 1 Transmission Line Structure 15 to 394. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

RAPID/Roadmap/3-FD-f | Open Energy Information  

Open Energy Info (EERE)

Application Process (6).pdf Click to View Fullscreen Permit Overview Transmission lines on National Park Service (NPS) lands are authorized by a Right-of-Way (ROW) permit. A...

202

RAPID/Roadmap/3-CO-b | Open Energy Information  

Open Energy Info (EERE)

Board). The Land Board may grant rights of way for, among other things, electric power lines for the operation of utilities. C.R.S. 36-1-136. Colorado law provides utilities with...

203

RAPID/Roadmap/3-WA-c | Open Energy Information  

Open Energy Info (EERE)

is required for occupancy of a highway right of way by facilities, including private lines. WAC 468-34-160. The process is governed by the Washington State Department of...

204

EA-1948: Finding of No Significant Impact | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

impact for a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations, to expand its right-of-way, and to grant...

205

Microsoft Word - Draft CX for Agent Operations Eastern Command...  

Broader source: Energy.gov (indexed) [DOE]

fence lined would be seeded with native grasses, if necessary. There is a very small patch of wetland vegetation in the right-of-way adjacent to where the fence would be placed;...

206

CX-004880: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Region, proposes to rehabilitate andor maintain its existing maintenance roads and transmission rights-of-way for the TRY-CC 104-111 transmission line spans. DOCUMENT(S)...

207

CX-004879: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Region, proposes to rehabilitate andor maintain its existing maintenance roads and transmission line rights-of-way for the Captain Jack-Olinda (CPJ-ODA) 259, 260, 261, 262, 275,...

208

CX-002763: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Western proposes to rehabilitate andor maintain its existing maintenance roads and transmission line rights-of-way for TRY-CC 104-111. O&M activities include vegetation removal...

209

BPA-2011-00930-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

No FAX number provided Email: I: Ot; S Description of Request: I live adjacent to a PBA transmission line right of way and you have an easement on my property. On 4-6, I beleive...

210

BPA-2011-00507-FOIA Request  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

vegetation management on my land. Please note location: Satsop Aberdeen 2 230kV Transmission Line right-of-way corridor, Steve W Narolski, Program Manager 3. Preferred...

211

BPA-2011-00507-FOIA Correspondence  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

vegetation management on my land. Please note location: Satsop Aberdeen 2 230kV Transmission Line right-of-way corridor, parcel 180933 130000, Steve W. Narolski, Program...

212

EA-1863: Final Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and right-of-way maintenance program for Western's Glen Canyon to Pinnacle Peak 345-kV transmission lines, which cross the Coconino National Forest, Coconino County, Arizona....

213

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hesperus-Montrose 345-kV Transmission Line Routine Maintenance of Right-of-Way Roads Ouray, Montrose, and San Miguel County, Colorado A. Brief Description of Proposal: Western Area...

214

2005 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

U.S. Energy Information Administration (EIA) Indexed Site

Page 1 Page 1 2012 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE Kerosene Line No. Sold directly to consumers for: 1 Residential Use (Non-Farm): * Backup generator * Home heating and cooking * Personal lawn equipment * EXCLUDE: Apartment buildings and Farmhouses 2 Commercial Use: * Apartment building * Bank * Casino * Church * College/School/Institution * Department/Retail store * Environmental clean-up service * Flushing fuel lines * Forestry service * Golf course * Government (Federal, State, local, and district; INCLUDE fuel used in vehicles) * Hazardous waste company * Hospital * Hotel/Motel * Landfill site government owned * Landscaping * Laundry company * Lumber yard that sells the lumber * Medical service * Port Authority/publicly owned port or loading dock

215

2013 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

waste company * Hospital * HotelMotel * Landfill site government owned (exclude private landfill, see Off-highway, as defined on page 3 for Lines 41 through 43) *...

216

Bipolar pulse forming line  

DOE Patents [OSTI]

A bipolar pulse forming transmission line module for linear induction accelerators having first, second, third, fourth, and fifth planar conductors which form an interleaved stack with dielectric layers between the conductors. Each conductor has a first end, and a second end adjacent an acceleration axis. The first and second planar conductors are connected to each other at the second ends, the fourth and fifth planar conductors are connected to each other at the second ends, and the first and fifth planar conductors are connected to each other at the first ends via a shorting plate adjacent the first ends. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short a high voltage from the first end of the third planar conductor to the first end of the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

Rhodes, Mark A. (Pleasanton, CA)

2008-10-21T23:59:59.000Z

217

CX-007356: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-007356: Categorical Exclusion Determination "Grant New Cingular Wireless' request for use of right-of-way at the Salem Substation CX(s) Applied: B4.9 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by New Cingular Wireless. BPA issued a CX for this project on September 19, 2011, however New Cingular Wireless slightly modified the location of the conduit and vault, and has resubmitted the right-of-way application. New Cingular Wireless proposes to place an approximately 140 foot long, 4 inch underground conduit from its existing wireless communications facility to an existing BPA utility pole located in a BPA right-of-way. A proposed

218

Analysis of interconnect microstrip lines  

E-Print Network [OSTI]

System C. Dyadic Green's Functions 1. TM and TE Decomposition 2. Transmission-Line Green's Functions . NUiVIERICAL PROCEDURES . A. Basis functions and testing procedure . 1. Interconnect of Microstrip Lines 2. Slot-Coupled Microstrip Dipole . 3... data of return loss on the 20 GHz slot-coupled rect- angular patch antenna. . FIG URE Pa. ge 28 Typical transmission line section containing a 1A current source. . . 68 CHAPTER I INTRODUCTION Many studies on slot-coupled microstrip antennas have...

Luong, Giam-Minh

2012-06-07T23:59:59.000Z

219

Testing in Software Product Lines.  

E-Print Network [OSTI]

??This thesis presents research aimed at investigating different activities involved in software product lines testing process and possible improvements towards achieving developing high quality software… (more)

Odia, Osaretin

2007-01-01T23:59:59.000Z

220

NETL LINES OF DEMARCATION 09282012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LINES OF DEMARCATION September 28, 2012 Contact: Site Operations Division or ESS&H Division with Questions The oversight, upkeep, and segregation of NETL infrastructure components,...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Western Area Power Administration  

Broader source: Energy.gov (indexed) [DOE]

v*Zy- i , . v*Zy- i , . r ,v * -i S # Af [, (e- . - o -A tl }r- 0 v-" l^~4~S J l ^-)^ I^U^ck iM clti ^ Right-of-Way Western has very little undeveloped transmission right-of-way. There is a 7-mile right- of-way between Folsom, CA and Roseville, CA where Western acquired a 250' wide right-of-way but is only using half of it. Another line could be built parallel to Western's line to relieve congestion in the Sacramento area. In addition, Western has rights-of- way for many transmission lines that could be rebuilt to increase transmission capacity. For example, Western's Tracy-Livermore 230-kV line is a single circuit line but the existing towers could support a double circuit line. These rights-of-way would have to

222

Silver Creek-Morton Transmission Project: Environmental assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) will in 1989, replace the Silver Creek-Morton 69-kV transmission line with a line of 115-kV construction and, in the late 1990's, add capacitors at Morton Substation. Portions of the new line would be constructed on new right-of-way adjacent to the old 69-kV line and portions would be constructed on the same right-of-way. Construction on adjacent right-of-way would require new right-of-way up to 50 feet wide on one side of the present right-of-way. BPA would then release to private ownership right-of-way up to 50 feet wide on the opposite side, after the old line has been removed. Parts of the new line would be constructed on H-frame wood-pole sructures and parts on single wood-pole structures, depending on land use constraints. 16 refs., 3 figs., 3 tabs.

Not Available

1986-06-01T23:59:59.000Z

223

Productivity Improvement of a Manual Assembly Line  

E-Print Network [OSTI]

or re-configuring an assembly system, which is the key step in improving the overall performance of an assembly line. Following this approach, two manual assembly line configurations (single stage parallel line and five-stage serial line...

Yerasi, Pranavi

2012-10-19T23:59:59.000Z

224

SunLine Transit Agency  

Broader source: Energy.gov [DOE]

SunLine Transit Agency provides public transit and community services to California's Coachella Valley. The service area is more than 1,100 square miles and includes nine member cities, as well as Riverside County. Over the years, SunLine has pursued an aggressive strategy for implementing clean technologies into its fleet.

225

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

226

Southwestern Power Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Application for Proposed Use of Southwestern Rights-of-Way Right-of-Way FAQ Right-Of-Way Safety Brochure Right-of-Way A right-of-way is a safety zone around Southwestern's high...

227

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network [OSTI]

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

228

Electric Transmission Line Siting Compact  

Broader source: Energy.gov (indexed) [DOE]

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

229

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

230

Resonance Broadening of Spectral Lines  

Science Journals Connector (OSTI)

A formalism introduced previously by the author is used to calculate the shape of an absorption line in a gas, taking account of the "resonance" interaction between like atoms. The most serious approximation is the neglect of the effect of translational motion. An asymmetric line is obtained, with the maximum shifted slightly toward the red. Some simple classical considerations also agree qualitatively with the results. Various properties of the line shape obtained are briefly discussed. The neglect of translational motion makes it impossible to compare the results with experiments performed up to the present time.

C. Alden Mead

1960-11-01T23:59:59.000Z

231

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

232

The beauty of laser lines  

E-Print Network [OSTI]

A line, the simplest way to express an artist's feelings or interpretation of an object, has its own emotions that an artist can employ for her purpose. Laser light, the most self-concentrated, self-sustained and directed, ...

Kim, Sue-Mie

1993-01-01T23:59:59.000Z

233

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

234

Crossover energetics for halogenated Si(100): Vacancy line defects, dimer vacancy lines, and atom vacancy lines  

Science Journals Connector (OSTI)

We investigated surface patterning of I-Si(100)-(2×1) both experimentally and theoretically. Using scanning tunneling microscopy, we first examined I destabilization of Si(100)-(2×1) at near saturation. Dimer vacancies formed on the terraces at 600 K, and they grew into lines that were perpendicular to the dimer rows, termed vacancy line defects. These patterns were distinctive from those induced by Cl and Br under similar conditions since the latter formed atom and dimer vacancy lines that were parallel to the dimer rows. Using first-principles density functional theory, we determined the steric repulsive interactions associated with iodine and showed how the observed defect patterns were related to these interactions. Concentration-dependent studies showed that the vacancy patterns were sensitive to the I concentration. Dimer and atom vacancy lines that were elongated along the dimer row direction were favored at lower coverage. Atom vacancy lines dominated at ?0.8ML, they coexisted with dimer vacancy lines at ?0.6-0.7ML, and dimer vacancy lines were exclusively observed below ?0.5ML. These surface patterns reflect the mean strength of the adatom repulsive interactions.

G. J. Xu; N. A. Zarkevich; Abhishek Agrawal; A. W. Signor; B. R. Trenhaile; D. D. Johnson; J. H. Weaver

2005-03-30T23:59:59.000Z

235

fault diagnosis of a high voltage transmission line using waveform ...  

E-Print Network [OSTI]

Oct 4, 2013 ... FAULT DIAGNOSIS OF A HIGH VOLTAGE TRANSMISSION LINE USING ... Fault types such as single line to ground, line to line, double line to ...

Ripunjoy Phukan

2013-10-04T23:59:59.000Z

236

Grism-Based Pulse Shaper for Line-by-Line Control of More than 600 Comb Lines  

Science Journals Connector (OSTI)

We construct a line-by-line pulse shaper using a grism dispersive element and achieve control of over six hundred 21 GHz comb lines. The 13.4 THz bandwidth is the largest ever...

Kirchner, Matthew S; Diddams, Scott A

237

Line-Shape Transition of Collision Broadened Lines  

Science Journals Connector (OSTI)

Using the newly developed technique of THz time-domain spectroscopy, we have measured the far-wing absorption line profile of the ensemble of collision broadened ground state rotational lines of methylchloride vapor out to more than 200 linewidths from resonance, corresponding to frequency offsets as much as 5× the resonant frequency. On these far wings the measured absorption is approximately an order of magnitude less than that predicted by the van Vleck–Weisskopf theory. Our observations show that at higher frequencies a transition occurs from the regime of the van Vleck–Weisskopf theory to the regime of the Lorentz theory.

H. Harde; N. Katzenellenbogen; D. Grischkowsky

1995-02-20T23:59:59.000Z

238

Domain lines as fractional strings  

Science Journals Connector (OSTI)

We consider N=2 supersymmetric quantum electrodynamics with two flavors, the Fayet-Iliopoulos parameter, and a mass term ? which breaks the extended supersymmetry down to N=1. The bulk theory has two vacua; at ?=0 the Bogomol’nyi-Prasad-Sommerfield (BPS) monopoles-saturated domain wall interpolating between them has a moduli space parameterized by a U(1) phase ? which can be promoted to a scalar field in the effective low-energy theory on the wall world-volume. At small nonvanishing ? this field gets a sine-Gordon potential. As a result, only two discrete degenerate BPS domain walls survive. We find an explicit solitonic solution for domain lines—stringlike objects living on the surface of the domain wall which separate wall I from wall II. The domain line is seen as a BPS kink in the world-volume effective theory. We expect that the wall with the domain line on it saturates both the {1,0} and the {12,12} central charges of the bulk theory. The domain line carries a magnetic flux which is exactly 12 of the flux carried by the flux tube living in the bulk on each side of the wall. Thus, the domain lines on the wall confine charges living on the wall, resembling Polyakov’s three-dimensional confinement.

R. Auzzi; M. Shifman; A. Yung

2006-08-11T23:59:59.000Z

239

Domain Lines as Fractional Strings  

E-Print Network [OSTI]

We consider N=2 supersymmetric quantum electrodynamics (SQED) with 2 flavors, the Fayet--Iliopoulos parameter, and a mass term $\\beta$ which breaks the extended supersymmetry down to N=1. The bulk theory has two vacua; at $\\beta=0$ the BPS-saturated domain wall interpolating between them has a moduli space parameterized by a U(1) phase $\\sigma$ which can be promoted to a scalar field in the effective low-energy theory on the wall world-volume. At small nonvanishing $\\beta$ this field gets a sine-Gordon potential. As a result, only two discrete degenerate BPS domain walls survive. We find an explicit solitonic solution for domain lines -- string-like objects living on the surface of the domain wall which separate wall I from wall II. The domain line is seen as a BPS kink in the world-volume effective theory. We expect that the wall with the domain line on it saturates both the $\\{1,0\\}$ and the $\\{{1/2},{1/2}\\}$b central charges of the bulk theory. The domain line carries the magnetic flux which is exactly 1/2 of the flux carried by the flux tube living in the bulk on each side of the wall. Thus, the domain lines on the wall confine charges living on the wall, resembling Polyakov's three-dimensional confinement.

R. Auzzi; M. Shifman; A. Yung

2006-06-07T23:59:59.000Z

240

Computing Criticality of Lines in Power Systems  

E-Print Network [OSTI]

Computing Criticality of Lines in Power Systems Ali P?narto identify critical lines, failure of which can causecriticality measure for all lines at a time, as opposed to

Pinar, Ali; Reichert, Adam; Lesieutre, Bernard

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Vortex lines and transitions in superfluid hydrodynamics  

Science Journals Connector (OSTI)

...Preface to Vortices, dislocations, and line singularities in partial differential equations...Leslie and J. R. Ockendon. Vortex lines and transitions in superfluid hydrodynamics...nature and the motion of qunatized vortex lines. This paper illustrates the transitions...

1997-01-01T23:59:59.000Z

242

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

243

Attractor Flows from Defect Lines  

E-Print Network [OSTI]

Deforming a two dimensional conformal field theory on one side of a trivial defect line gives rise to a defect separating the original theory from its deformation. The Casimir force between these defects and other defect lines or boundaries is used to construct flows on bulk moduli spaces of CFTs. It turns out, that these flows are constant reparametrizations of gradient flows of the g-functions of the chosen defect or boundary condition. The special flows associated to supersymmetric boundary conditions in N=(2,2) superconformal field theories agree with the attractor flows studied in the context of black holes in N=2 supergravity.

Ilka Brunner; Daniel Roggenkamp

2010-02-12T23:59:59.000Z

244

Directed lines in sparse potentials  

Science Journals Connector (OSTI)

We present a continuum formulation of a (d+1)-dimensional directed line interacting with sparse potentials (i.e., d-dimensional potentials defined only at discrete longitudinal locations.) An iterative solution for the partition function is derived. The impulsive influence of the potentials induces discontinuities in the evolution of the probability density P(x,t) of the directed line. The effects of these discontinuities are studied in detail for the simple case of a single defect. We then investigate sparse columnar potentials defined as a periodic array of defects in (2+1) dimensions, and solve exactly for P. A nontrivial binding-unbinding transition is found.

T. J. Newman and A. J. McKane

1997-01-01T23:59:59.000Z

245

Objective determination of optimal power line designs.  

E-Print Network [OSTI]

??Includes abstract. The thesis investigated the possibility of overhead power line designs being decided by using an objective rather thana subjective method. Power lines are… (more)

Stephen, Robert G.

2010-01-01T23:59:59.000Z

246

What can emission lines tell us?  

E-Print Network [OSTI]

1 Generalities 2 Empirical diagnostics based on emission lines 3 Photoionization modelling 4 Pending questions 5 Appendix: Lists of useful lines and how to deal with them

G. Stasinska

2007-04-03T23:59:59.000Z

247

Stark broadening of potassium lines  

Science Journals Connector (OSTI)

Recently published Stark broadening data of potassium ns-4p and nd-4p lines have been reexamined. Newly derived data are compared with theoretical results obtained from a simple approximative formula. The experiment agrees with theoretical results, in average, within ±20%.

N. Konjevi?

1985-07-01T23:59:59.000Z

248

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

249

Supplement Analysis for the Transmission System Vegetation Management Program FEIS DOE/EIS-0285/SA-08  

SciTech Connect (OSTI)

Clearing C-trees along the south side of the right-of-way. This project meets the standards and guidelines for the Transmission System Vegetation Management Program Final Environmental Impact Statement (FEIS) and Record of Decision (ROD). The project involves controlling all tall growing trees (C-Trees) within the right-of-way. All work is to be done on the south side of centerline. Target vegetation is the tall growing Firs along the edge of the ROW, all of which is located within the back yards of the property owners along the right-of-way. The density of vegetation is low and consists of C-Trees located within backyards, with the branches growing towards the lines. Due to lack of access and past verbal agreements with the landowners, permission/agreement has been difficult to obtain from the property owners. Permission has now been obtained to remove the C-Trees within their back yards which, will soon be a hazard to our transmission line facility. We are working with the landowners to get them to plant low growing scrubs and ornamentals within the right-of-way and adjacent to the right-of-way. A follow up herbicide treatment is not planned because the trees being cut will not re-sprout. This right-of-way or project area is on a three to four year maintenance schedule. Little or no treatment should be required in the immediate future.

N /A

2001-04-23T23:59:59.000Z

250

On the accuracy of line-of-sight velocity measurements using telluric lines as reference lines  

Science Journals Connector (OSTI)

It is demonstrated that telluric lines H2O and O2 are displaced as much as 0.2 mÅ as the solar disk is being scanned. The temporal variations of such displacements have a quasi-periodic character.

N. I. Kobanov

1985-09-01T23:59:59.000Z

251

Proposed Project: Plains & Eastern Clean Line  

Broader source: Energy.gov [DOE]

On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line’s proposal was responsive to the RFP, and it is currently under consideration.

252

BOREAS Survey On-Line  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FF33"> FF33"> BOREAS Survey On-Line To improve the BOREAS and BOREAS Follow-On data sets and to meet users' needs, we are conducting a survey. The BOREAS and BOREAS Follow-On data sets continue to be important products at the ORNL DAAC. To date we have provided over 8,000 data products from these projects to nearly 1,500 users. We invite you to fill out this survey, identifying any problems you had with the data and documentation or any difficulties you experienced in finding and acquiring the data sets. Information you provide will enable us to address problems that need attention. It will also help us determine which aspects of the BOREAS and BOREAS Follow-On information need to be expanded. You can complete the survey at the BOREAS Home Page. After you complete the on-line survey, submit your answers to the ORNL

253

Fuzzy Bags and Wilson Lines  

E-Print Network [OSTI]

I start with an elementary observation about the pressure in the deconfined phase of a SU(3) gauge theory without quarks. This suggests a ``fuzzy'' bag model for the analogous pressure in QCD, with dynamical quarks. I then sketch how the deconfined phase might be described using an effective theory of Wilson lines. To leading order in weak coupling, the effective electric field appears in a form familiar from the lattice theory of Banks and Ukawa.

Robert D. Pisarski

2006-12-15T23:59:59.000Z

254

Dynamic roughening of directed lines  

Science Journals Connector (OSTI)

We study the fluctuations of a stretched string, e.g., a vortex line, moving in a random medium. A pair of nonlinear equations are proposed to describe the evolution of longitudinal and transverse coordinates. The dynamic scaling of the fluctuations is studied analytically (by renormalization group) and numerically. In most cases the fluctuations are superdiffusive, governed by a dynamic exponent z=3/2.

Deniz Erta? and Mehran Kardar

1992-08-10T23:59:59.000Z

255

In-line thermoelectric module  

DOE Patents [OSTI]

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions may be perpendicular to the direction of current flow through the module.

Pento, Robert (Algonquin, IL); Marks, James E. (Glenville, NY); Staffanson, Clifford D. (S. Glens Falls, NY)

2000-01-01T23:59:59.000Z

256

In-Line Thermoelectric Module  

SciTech Connect (OSTI)

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an-in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions maybe perpendicular to the direction-of current flow through the module.

Pento, Robert; Marks, James E.; Staffanson, Clifford D.

1998-07-28T23:59:59.000Z

257

Mud return line connector apparatus  

SciTech Connect (OSTI)

The preferred and illustrated embodiment is a connector adapted to be joined above a blowout preventer and below the rotary table of a drilling rig. It collects the annular flow of returned drilling mud and directs mud to an incorporated, radially directed connective nipple. It enables the blowout preventer to be adjusted in location relative to the drilling rig and further accommodates a variable level of drilling mud in the annular space. The radial nipple connects with a mud line extending at some radial direction with a slope causing the mud to flow by gravity from the annular space to remote located mud tanks.

Ward, B.N.

1981-07-07T23:59:59.000Z

258

Power Lines, Cancer, and Fear  

Science Journals Connector (OSTI)

...hypothesized cause was exposure to extremely-low-frequency magnetic fields generated by the electrical current in power lines. Physicists understand these invisible fields well, but most physicians, parents, and patients do not. The movement of any electrical charge creates a magnetic field that can be measured... Over the past 18 years, there has been considerable interest in the possible link between electromagnetic fields and cancer, especially leukemia. The story of this highly publicized research has been marked by mystery, contradiction, and confusion. When ...

Campion E.W.

1997-07-03T23:59:59.000Z

259

Transmission-Line Metamaterial Design of an Embedded Line Source in a Ground Recess.  

E-Print Network [OSTI]

??A transmission-line metamaterial design of a material-embedded electric line source radiating inside a ground recess is investigated. The media embedding the recessed line source are… (more)

EMIROGLU, CAGLAR D

2011-01-01T23:59:59.000Z

260

MagLab - Transmission Lines Tutorial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Potential Vorticity Anomalies Associated with Squall Lines  

Science Journals Connector (OSTI)

This study involves observations and model simulations of potential vorticity anomalies in the wake of midlatitude squall lines. Using data from the Oklahoma–Kansas PRE-STORM experiment, we analyze potential vorticity fields near two squall lines—...

Rolf F. A. Hertenstein; Wayne H. Schubert

1991-07-01T23:59:59.000Z

262

Route selection and detailed line design  

Science Journals Connector (OSTI)

The requirements for route selection and detailed line design of a high-voltage overhead line are established by the preparatory work, studies ... the required starting and terminal point of a transmission connec...

Dr.-Ing. Friedrich Kiessling; Dipl.-Ing. Peter Nefzger…

2003-01-01T23:59:59.000Z

263

Approximation of inhomogeneous thermal lines via series connection of homogeneous thermal lines  

Science Journals Connector (OSTI)

A method is given for approximating an arbitrary inhomogeneous thermal line (ITL) as a series connection of homogeneous thermal lines (HTL). The method is compared with...

L. S. Eleinikova

1974-10-01T23:59:59.000Z

264

Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization  

DOE Patents [OSTI]

Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes. 21 figs.

Jankowiak, R.J.; Small, G.J.; Shields, P.A.

1999-04-27T23:59:59.000Z

265

Title Line 2 Commercialization at the  

E-Print Network [OSTI]

-exclusive or exclusive license (royalty free or royalty bearing) ­ Researchers sign acknowledgment #12;Title Title Line 2

Czarnecki, Krzysztof

266

Methods of Using Existing Wire Lines (power lines, phone lines, internet lines) for Totally Secure Classical Communication Utilizing Kirchoff's Law and Johnson-like Noise  

E-Print Network [OSTI]

We outline some general solutions to use already existing and currently used wire lines, such as power lines, phone lines, internet lines, etc, for the unconditionally secure communication method based on Kirchoff's Law and Johnson-like Noise (KLJN). Two different methods are shown. One is based on filters used at single wires and the other one utilizes a common mode voltage superimposed on a three-phase powerline.

Laszlo B. Kish

2006-10-02T23:59:59.000Z

267

Kant and Parallel Lines Jeremy Heis  

E-Print Network [OSTI]

Kant and Parallel Lines Jeremy Heis University of California, Irvine HOPOS 2010 #12;Kant. #12;Two interesting issues 1. Was Kant aware of the problems posed to geometry by parallel lines? Did to geometry by parallel lines? Did he reflect on these problems? 2. Did these two "Euclidean" features of Kant

Barrett, Jeffrey A.

268

Stark broadening of Pb IV spectral lines  

Science Journals Connector (OSTI)

......Article Stark broadening of Pbiv spectral lines Rafik Hamdi 1 Nabil Ben Nessib 2 3 Milan...parameters have been calculated for 114 spectral lines of triply charged lead ion (Pbiv) using...electron density of 10173. The studied lines correspond to transitions between the configurations......

Rafik Hamdi; Nabil Ben Nessib; Milan S. Dimitrijevic; Sylvie Sahal-Bréchot

2013-01-01T23:59:59.000Z

269

Molecular Evolutionary Analysis of Cancer Cell Lines  

Science Journals Connector (OSTI)

...Molecular Evolutionary Analysis of Cancer Cell Lines Yan Zhang 1 Michael J. Italia 2 Kurt R...phylogenetic analysis of 353 cancer cell lines based on multiple sequence alignments of...Reconstructed phylogenetic trees cluster cell lines by shared DNA variant patterns rather than...

Yan Zhang; Michael J. Italia; Kurt R. Auger; Wendy S. Halsey; Stephanie F. Van Horn; Ganesh M. Sathe; Michal Magid-Slav; James R. Brown; Joanna D. Holbrook

2010-02-01T23:59:59.000Z

270

Stability of ice-sheet grounding lines  

Science Journals Connector (OSTI)

...81 73 Stability of ice-sheet grounding lines Richard F. Katz 1 * M. Grae Worster 2...ice sheets are sensitive to grounding-line position and variation, characteristics...models. We present a theory for grounding-line dynamics in three spatial dimensions and...

2010-01-01T23:59:59.000Z

271

Minimal surfaces bounded by elastic lines  

Science Journals Connector (OSTI)

...117 Minimal surfaces bounded by elastic lines L. Giomi 1 L. Mahadevan 1 2 * * Author...a minimal surface bounded by an elastic line: the Euler-Plateau problem. We use...a minimal surface bounded by an elastic line. The competition between the surface tension...

2012-01-01T23:59:59.000Z

272

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network [OSTI]

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

273

Transmission Line MTF: Magnetized Target Fusion  

E-Print Network [OSTI]

Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap compression to fusion conditions Magnetic field of at least 5 T in a closed-field line topology Density ~ 1017

274

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

275

Power Line Calculator for DOS  

SciTech Connect (OSTI)

The Power Line Calculator (PLC) for DOS, version 1.0, is a program that describes the electrical characteristics of a transmission or distribution system given user-defined input. This input may consist of a combination of operating currents and phases, symmetric components, power factor, and real or reactive power. The program also allows the user to designate whether currents are present on the system neutral or in the ground. The PLC assumes that any value entered by the user remains fixed (e.g., phase current, power factor), and for underdetermined systems, basic default assumptions are incorporated: the power factor is held at or near 1.0, the net phase current is kept at or near zero, and the phase conductor currents are kept balanced. The program operates under PC/MS-DOS version 3.3 or later, and the output is available in both tabular and graphic formats.

Silva, J.M. (Enertech Consultants, Campbell, CA (United States))

1992-11-01T23:59:59.000Z

276

Unsplit bipolar pulse forming line  

DOE Patents [OSTI]

A bipolar pulse forming transmission line module and system for linear induction accelerators having first, second, third, and fourth planar conductors which form a sequentially arranged interleaved stack having opposing first and second ends, with dielectric layers between the conductors. The first and second planar conductors are connected to each other at the first end, and the first and fourth planar conductors are connected to each other at the second end via a shorting plate. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short at the first end a high voltage from the third planar conductor to the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

Rhodes, Mark A. (Pleasanton, CA)

2011-05-24T23:59:59.000Z

277

Magnetically insulated transmission line oscillator  

DOE Patents [OSTI]

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

278

Superconducting transmission line particle detector  

DOE Patents [OSTI]

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

279

Microsoft Word - UEC_LURR20130062_CX  

Broader source: Energy.gov (indexed) [DOE]

Sandra Billings - TERR-FRANKLIN Sandra Billings - TERR-FRANKLIN Project Manager Proposed Action: Umatilla Electric Cooperative (UEC) use of right-of-way south of McNary Substation Land Use Review Request Case No.: 20130062 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.9 Multiple Use of Powerline Rights-of-Way Location: Umatilla, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to allow UEC to use 0.7 miles of BPA fee-owned right-of-way to construct a portion of a 3-mile, double-circuit 115-kV transmission line. The area has been previously disturbed by the construction of transmission lines and other utilities. UEC's proposed line would cross eight BPA transmission lines ranging in voltage from

280

(DOE/EIS-0285/SA 108): Supplement Analysis for the Transmission System Vegetation Management Program FEIS Satsop-Aberdeen #2 9/5/02  

Broader source: Energy.gov (indexed) [DOE]

8, 8, Satsop-Aberdeen #2. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Satsop-Aberdeen #2 230kV transmission line corridor from structure 1/1 through structure 11/5 (reference line). Other lines which are present in the proposed corridor are the Satsop-Aberdeen #3 230 kV, South Elma-Cosmopolis 115kV, and Aberdeen tap to South Elma-Cosmospolis 115kV. Right of way width averages 238 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 11 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Separation of magnetic field lines  

SciTech Connect (OSTI)

The field lines of magnetic fields that depend on three spatial coordinates are shown to have a fundamentally different behavior from those that depend on two coordinates. Unlike two-coordinate cases, a flux tube in a magnetic field that depends on all three spatial coordinates that has a circular cross section at one location along the tube characteristically has a highly distorted cross section at other locations. In an ideal evolution of a magnetic field, the current densities typically increase. Crudely stated, if the current densities increase by a factor {sigma}, the ratio of the long to the short distance across a cross section of a flux tube characteristically increases by e{sup 2{sigma}}, and the ratio of the longer distance to the initial radius increases as e{sup {sigma}}. Electron inertia prevents a plasma from isolating two magnetic field structures on a distance scale shorter than c/{omega}{sub pe}, which is about 10 cm in the solar corona, and reconnection must be triggered if {sigma} becomes sufficiently large. The radius of the sun, R{sub Circled-Dot-Operator }=7 Multiplication-Sign 10{sup 10}cm is about e{sup 23} times larger, so when {sigma} Greater-Than-Or-Equivalent-To 23, two lines separated by c/{omega}{sub pe} at one location can be separated by the full scale of any magnetic structures in the corona at another. The conditions for achieving a large exponentiation, {sigma}, are derived, and the importance of exponentiation is discussed.

Boozer, Allen H. [Department of Applied Physics and Applied Mathematics, Columbia University, New York, New York 10027 (United States)

2012-11-15T23:59:59.000Z

282

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

283

Line Extension Alternatives | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Line Extension Alternatives Line Extension Alternatives Line Extension Alternatives < Back Eligibility Utility Savings Category Energy Sources Buying & Making Electricity Solar Wind Program Info State Vermont Program Type Line Extension Analysis Provider Vermont Department of Public Service The Public Service Board (PSB) of Vermont developed rules regarding utility line extension requests. While the majority of the rules focus on the procedure followed (and associated fees) for the actual line extensions, the PSB also included a provision that requires the electric utilities to provide written information to customers about off-grid electricity generators as an alternative to line extensions. The PSB recognized that in many cases off-grid electricity generators are less expensive than

284

Line Extension Analysis | Open Energy Information  

Open Energy Info (EERE)

Line Extension Analysis Line Extension Analysis Jump to: navigation, search When a prospective electric customer requests service for a home or facility that is not currently serviced by the electric grid, the customer usually must pay a distance-based fee for the cost of extending power lines to the home or facility. In many cases, it is cheaper to use an on-site renewable energy system to meet a prospective customerÂ’s electricity needs. Certain states require utilities to provide information regarding renewable energy options when prospective customers request a line extension. [1] Line Extension Analysis Incentives CSV (rows 1 - 12) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Authorization of Line Extension (Nebraska) Line Extension Analysis Nebraska Agricultural

285

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

286

Enhanced Transmission Line Theory: Frequency-Dependent Line Parameters And Their Insertion in a  

E-Print Network [OSTI]

Enhanced Transmission Line Theory: Frequency- Dependent Line Parameters And Their Insertion in a Classical Transmission Line Equation Solver S. Chabane, P. Besnier IETR: Institute of Electronics--In this paper, a modified enhanced transmission- line theory taking into account higher-order modes is described

Paris-Sud XI, Université de

287

Point-line spaces related to Jordan pairs.  

E-Print Network [OSTI]

??A point-line space is an abstract geometric object that consists of a set of points and a set of lines such that on each line… (more)

Huggenberger, Simon

2009-01-01T23:59:59.000Z

288

Juxtaclavicular beaded lines: A presentation of sebaceous gland hyperplasia  

E-Print Network [OSTI]

Juxta-clavicular beaded lines: A subepidermal proliferationWC. Juxta-clavicular beaded lines. Arch Dermatol 1974;110:A. Juxtaclavicular beaded lines: A malformative condition

Woldow, Adam B; Houk, Laura D; Samie, Faramarz H

2009-01-01T23:59:59.000Z

289

The transcriptional diversity of 25 Drosophila cell lines  

E-Print Network [OSTI]

diversity of 25 Drosophila cell lines Lucy Cherbas, 1 Aarronof Drosophila melanogaster cell lines. ] C R Acad Sci Hebdof two tumorous blood cell lines of Drosophila melanogaster

Cherbas, Lucy

2013-01-01T23:59:59.000Z

290

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

291

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

292

Roughening Transition in a Moving Contact Line  

E-Print Network [OSTI]

The dynamics of the deformations of a moving contact line on a disordered substrate is formulated, taking into account both local and hydrodynamic dissipation mechanisms. It is shown that both the coating transition in contact lines receding at relatively high velocities, and the pinning transition for slowly moving contact lines, can be understood in a unified framework as roughening transitions in the contact line. We propose a phase diagram for the system in which the phase boundaries corresponding to the coating transition and the pinning transition meet at a junction point, and suggest that for sufficiently strong disorder a receding contact line will leave a Landau--Levich film immediately after depinning. This effect may be relevant to a recent experimental observation in a liquid Helium contact line on a Cesium substrate [C. Guthmann, R. Gombrowicz, V. Repain, and E. Rolley, Phys. Rev. Lett. {\\bf 80}, 2865 (1998)].

Ramin Golestanian; Elie Raphael

2002-04-24T23:59:59.000Z

293

NSLS-II Transport Line Progress  

SciTech Connect (OSTI)

The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

Fliller R. P.; Wahl, W.; Anderson, A.; Benish, B.; DeBoer, W.; Ganetis, G.; Heese, R.; Hseuh, H.-C.; Hu, J.-P.; Johanson, M.P.; Kosciuk, B.N.; Padrazo, D.; Roy, K.; Shaftan, T.; Singh, O.; Tuozzolo, J.; Wang, G.

2012-05-20T23:59:59.000Z

294

Single transmission line data acquisition system  

DOE Patents [OSTI]

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

295

(DOE/EIS-0285-SA-115): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Shelton-Fairmount # 1-4 12/20/02  

Broader source: Energy.gov (indexed) [DOE]

0, 0, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 115, Shelton- Fairmount # 1-4. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Shelton Fairmount # 1-4 230kV & 115kV transmission lines corridor from structure 34/3 through structure 60/2 (reference line ADNO 8354). Right of way width averages 258 feet. Location: The project area is located in Jefferson County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridors. Approximately 26 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and

296

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion for erosion repair and cactus relocation along the existing Tucson-Apache 11S-kV transmission line in Pima County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to construct a new access road along the existing Tucson-Apache 11S-kV transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-2S/2 & 2S/3- 26/S. We will be installing two gates to limit right-of-way access from Houghton Road. We will be creating reinforced embankments through the placement of

297

(DOE/EIS-0285/SA-119): Supplement Analysis for the Transmission System Vegetation Management Program FEIS 1/29/03  

Broader source: Energy.gov (indexed) [DOE]

9, 2003 9, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-119 Snohomish-Murray No. 1 Transmission Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the Snohomish-Murray No. 1 Transmission Line from structure 2/6 through structure 18/6. Right of way width is 95 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Total right-of-way acreage is approximately 182.8 acres. Approximately 17 miles of access roads will

298

EIS-0285-SA-13: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis EIS-0285-SA-13: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management along the Naselle Tarlett #1 and #2 transmission line Right of Way. BPA proposes to clear unwanted vegetation in the rights-of-ways and around tower structures that may impede the operation and maintenance of the subject transmission line. Also, access road clearing will be conducted. All work will be in accordance with the National Electrical Safety Code and BPA standards. BPA plans to conduct vegetation control with the goal of removing tall growing vegetation that is currently or will soon be a hazard to the transmission line. BPA's overall goal is to have low-growing plant communities along the rights-of-way to control the development of potentially threatening

299

Iron Lines in Superstrong Magnetic Fields  

Science Journals Connector (OSTI)

The possibility of observing atomic lines in the x-ray spectra of strongly magnetized accreting neutron stars is discussed. For magnetic field strengths ranging from 1011-1014 G, both the energies and oscillator strengths of Fe XXVI lines are calculated quantitatively. These lines are expected to be highest in energy, and should dominate at source temperatures kT?10-30 keV.

H. Ruder; G. Wunner; H. Herold; J. Trümper

1981-06-29T23:59:59.000Z

300

Intelligent fault diagnosis of power transmission line; -.  

E-Print Network [OSTI]

??This dissertation presents the application of recent intelligent newlinetechniques for fault diagnosis in electrical power transmission line Fault newlinesection identification classification and location are the… (more)

Malathi, V

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

302

Detonator comprising a nonlinear transmission line  

DOE Patents [OSTI]

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

303

Line Rebuild, Relocation and Substation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Palisades-Goshen Rebuild Wind Projects Line Rebuild, Relocation and Substation Projects BPA has identified several critical rebuild and substation projects...

304

Emergency Management Lines of Inquiry, April 2008  

Energy Savers [EERE]

Lines of Inquiry plansprotocols, interview facility managers and responders, and conduct facility walkdowns, as necessary. In : ment s and responsibilities for program...

305

DOE Sustainability Reporting Open Line Help Call  

Broader source: Energy.gov [DOE]

The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual sustainability reporting process. Representatives from the...

306

EM, County Install Sewer Line for Development  

Broader source: Energy.gov [DOE]

Crews are installing a sewer line in the Portsmouth site to connect EM’s sewer treatment facility to the Pike County Manufacturing Center, which is being developed.

307

Mimicking human-drawn pencil lines.  

E-Print Network [OSTI]

??In applications such as architecture, early design sketches containing accurate line drawings often mislead the target audience [Schumann et al. 1996]. Approximate human-drawn sketches are… (more)

Al-Meraj, Zainab Faisal

2008-01-01T23:59:59.000Z

308

Particles as Wilson lines of gravitational field  

E-Print Network [OSTI]

Since the work of Mac-Dowell-Mansouri it is well known that gravity can be written as a gauge theory for the de Sitter group. In this paper we consider the coupling of this theory to the simplest gauge invariant observables that is, Wilson lines. The dynamics of these Wilson lines is shown to reproduce exactly the dynamics of relativistic particles coupled to gravity, the gauge charges carried by Wilson lines being the mass and spin of the particles. Insertion of Wilson lines breaks in a controlled manner the diffeomorphism symmetry of the theory and the gauge degree of freedom are transmuted to particles degree of freedom.

L. Freidel; J. Kowalski--Glikman; A. Starodubtsev

2006-07-04T23:59:59.000Z

309

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

310

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

311

Crews repair transmission lines after Washington wildfire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

312

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

313

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

314

Asiakastyytyväisyystutkimus Sun Lines Oy:n tilausristeilyistä.  

E-Print Network [OSTI]

??Tämän tutkimuksellisen opinnäytetyön tarkoituksena on toteuttaa asiakastyytyväisyystutkimus Helsingin saaristossa risteilyliikennettä harjoittavan Sun Lines Oy:n tilausristeilyistä. Vuonna 1956 toimintansa aloittaneen perheyrityksen toimintaan kuuluvat tilausristeilyjen ohella linjaliikenne… (more)

Mattila, Outi

2010-01-01T23:59:59.000Z

315

Two lines or not two lines? That is the question of gamma ray spectra  

SciTech Connect (OSTI)

Lines in the spectrum of cosmic gamma rays are considered one of the more robust signatures of dark matter annihilation. We consider such processes from an effective field theory vantage, and find that generically, two or more lines are expected, providing an interesting feature that can be exploited for searches and reveal details about the underlying theory of dark matter. Using the 130 GeV feature recently reported in the Fermi-LAT data as an example, we analyze the energy spectrum in the multi-line context and find the data to be consistent with a single ?? line, a single ?Z line or both a ?? and a ?Z line.

Rajaraman, Arvind; Tait, Tim M.P.; Whiteson, Daniel, E-mail: arajaram@uci.edu, E-mail: ttait@uci.edu, E-mail: daniel@uci.edu [Department of Physics and Astronomy, University of California, Irvine, 4129 Frederick Reines Hall, Irvine, CA 92697-4575 (United States)

2012-09-01T23:59:59.000Z

316

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

317

Transmission line protection based on travelling waves  

Science Journals Connector (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

318

Nonidentified Kikuchi lines with reverse contrast  

SciTech Connect (OSTI)

Electron diffraction patterns of silicon in transmission with contrast reversal from bright to dark for an unidentified Kikuchi line along its length have been obtained. The contrast reversal of an unidentified line is explained within the elementary mechanism of Kikuchi pattern formation taking into account the Kikuchi electron double diffraction.

Karakhanyan, K. R., E-mail: kkarakhanyan@yandex.ru [Yerevan State University (Armenia)

2009-03-15T23:59:59.000Z

319

LA NACION LINE Ciencia/Salud  

E-Print Network [OSTI]

LA NACION LINE Ciencia/Salud Viernes 4 de Abril de 2003 LA NACION LINE | Ed. Anteriores | 4 de Abril de 2003 | Ciencia/Salud | Nota Estudio del Museo Egidio Feruglio, de Trelew La diversidad vegetal://www.lanacion.com.ar/03/04/04/sl_486019.asp LA NACION | 04/04/2003 | Página 14 | Ciencia/Salud Volver a ediciones

Wilf, Peter

320

xDSL line driver design  

E-Print Network [OSTI]

xDSL line driver is a very important element in xDSL systems. This thesis proposes a three stage xDSL line driver solution based on a multipath feedforward compensation principle. TSMC 0.8 micro meter high voltage BiCMOS technology is used as a...

Zhang, Xiaoyong

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Dynamic simulation of polyester mooring lines  

E-Print Network [OSTI]

A numerical scheme, known as CABLE3D, originally developed for the simulation of dynamics of steel chain-wire mooring lines is extended to allow for the large elongation in a mooring line, the dependence of the modulus on tension, and energy...

Kim, Min Suk

2004-09-30T23:59:59.000Z

322

A numerical tool for transmission lines  

Science Journals Connector (OSTI)

The electric line numerical study is usually made through a harmonic approach with the impedance concept based on the Finite Difference discretization in both the time and space domains. These methods present severe drawbacks when used in impulse working ... Keywords: differential system, finite element method, impulse voltage, stiff time problem, transmission line

Hervé Bolvin; André Chambarel; Philippe Neveux

2005-05-01T23:59:59.000Z

323

Multiple gamma lines from semi-annihilation  

SciTech Connect (OSTI)

Hints in the Fermi data for a 130 GeV gamma line from the galactic center have ignited interest in potential gamma line signatures of dark matter. Explanations of this line based on dark matter annihilation face a parametric tension since they often rely on large enhancements of loop-suppressed cross sections. In this paper, we pursue an alternative possibility that dark matter gamma lines could arise from ''semi-annihilation'' among multiple dark sector states. The semi-annihilation reaction ?{sub i}?{sub j} ? ?{sub k}? with a single final state photon is typically enhanced relative to ordinary annihilation ?{sub i}?-bar {sub i} ? ?? into photon pairs. Semi-annihilation allows for a wide range of dark matter masses compared to the fixed mass value required by annihilation, opening the possibility to explain potential dark matter signatures at higher energies. The most striking prediction of semi-annihilation is the presence of multiple gamma lines, with as many as order N{sup 3} lines possible for N dark sector states, allowing for dark sector spectroscopy. A smoking gun signature arises in the simplest case of degenerate dark matter, where a strong semi-annihilation line at 130 GeV would be accompanied by a weaker annihilation line at 173 GeV. As a proof of principle, we construct two explicit models of dark matter semi-annihilation, one based on non-Abelian vector dark matter and the other based on retrofitting Rayleigh dark matter.

D'Eramo, Francesco [Department of Physics, University of California, Berkeley, CA 94720 (United States); McCullough, Matthew; Thaler, Jesse, E-mail: fraderamo@berkeley.edu, E-mail: mccull@mit.edu, E-mail: jthaler@mit.edu [Center for Theoretical Physics, Massachusetts Institute of Technology, Cambridge, MA 02139 (United States)

2013-04-01T23:59:59.000Z

324

Line geometry and electromagnetism I: basic structures  

E-Print Network [OSTI]

Some key notions of line geometry are recalled, along with their application to mechanics. It is then shown that most of the basic structures that one introduces in the pre-metric formulation of electromagnetism can be interpreted directly in terms of corresponding concepts in line geometry. The results are summarized in a table.

D. H. Delphenich

2013-09-11T23:59:59.000Z

325

The Method of Lines for the Analysis of Microstrip Lines on the Finite Width Substrate  

Science Journals Connector (OSTI)

A full-wave analysis of the electrical characteristics of the microstrip lines on the finite width substrate is presented. The substrate layer of the microstrip line must be treated as an inhomogeneous layer. ......

Bo Gao; Ling Tong; Xun Gong

2009-06-01T23:59:59.000Z

326

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Broader source: Energy.gov (indexed) [DOE]

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

327

CX-006818: Categorical Exclusion Determination | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

18: Categorical Exclusion Determination 18: Categorical Exclusion Determination CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by New Cingular Wireless. New Cingular Wireless proposes to place a 140 foot long, 4 inch underground conduit from its existing wireless communications facility to an existing BPA utility pole located in a BPA right-of-way. A proposed vault for fiber, 3 feet 1 inch by 6 feet 7 inches, would be placed just outside the fenced area of the substation. The area has been previously disturbed. Document(s) Available for Download

328

EIS-0077-S: Bonneville Power Administration Crow Butte Slough Crossing  

Broader source: Energy.gov [DOE]

The Bonneville Power Administration developed this SEIS to evaluate potential impacts resulting from construction of a 4,700 -foot segment of the Ashe-Slatt transmission line at Crow Butte Slough, overhead on towers on the existing right-of-way. This SEIS is a supplement to DOE/EIS-0077, Ashe-Slatt (Pebble Springs) 500-kilovolt Transmission Line.

329

(DOE/EIS-0285/SA 107): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, Elma-Cosmopolis #1 9/5/02  

Broader source: Energy.gov (indexed) [DOE]

7, 7, Elma-Cosmopolis #1. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Elma-Cosmopolis #1 115kV transmission line corridor from structure 11/7 through structure 20/3. Right of way width averages 100 feet. Location: The project area is located in Grays Harbor County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridors. Approximately 8 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 2.8 miles of access roads will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Tower sites

330

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

331

EIS-0285-SA-133: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Supplement Analysis 3: Supplement Analysis EIS-0285-SA-133: Supplement Analysis Transmission System Vegetation Management Program Vegetation Management for the Hanford-Ostrander Corridor from structure 126/1 through structure 146/4. Right of way width averages 312 feet. BPA proposes to remove unwanted vegetation along the right-of-way, access roads, and around tower structures along the subject transmission line corridors. Approximately 20 miles of right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Access roads and tower sites will be cleared using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Vegetation management is required for unimpeded operation and maintenance of the subject transmission line

332

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

81 - 25690 of 31,917 results. 81 - 25690 of 31,917 results. Download CX-002690: Categorical Exclusion Determination Pajarito Road Right-Of-Way Shift at TA-50 and TA-55 CX(s) Applied: B1.13 Date: 04/21/2010 Location(s): New Mexico Office(s): Los Alamos Site Office http://energy.gov/nepa/downloads/cx-002690-categorical-exclusion-determination Download CX-002212: Categorical Exclusion Determination Shunt Capacitor Addition at Jones Canyon Substation CX(s) Applied: B4.11 Date: 04/21/2010 Location(s): Arlington, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-002212-categorical-exclusion-determination Download CX-006352: Categorical Exclusion Determination Design, Install, and Operate New 2F Evaporator Feed Pump CX(s) Applied: B1.3 Date: 06/24/2011 Location(s): Aiken, South Carolina

333

Categorical Exclusion Determinations: Oregon | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 25, 2011 August 25, 2011 CX-006585: Categorical Exclusion Determination Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside Trail CX(s) Applied: B4.9 Date: 08/25/2011 Location(s): Beaverton, Oregon Office(s): Bonneville Power Administration August 25, 2011 CX-006514: Categorical Exclusion Determination HAZGAS and Fire Alarm Monitoring System CX(s) Applied: A11, B2.2, B2.3 Date: 08/25/2011 Location(s): Albany, Oregon Office(s): Fossil Energy, National Energy Technology Laboratory August 24, 2011 CX-006778: Categorical Exclusion Determination Alvey Maintenance Headquarters Pole Storage Facility Upgrades CX(s) Applied: B4.6 Date: 08/24/2011 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration August 24, 2011 CX-006776: Categorical Exclusion Determination

334

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31 - 30140 of 31,917 results. 31 - 30140 of 31,917 results. Download CX-010425: Categorical Exclusion Determination Pearl-Keeler Right-of-Way (ROW) Marking Project CX(s) Applied: B1.3 Date: 06/11/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010425-categorical-exclusion-determination Download CX-010427: Categorical Exclusion Determination Hat Rock Switching Station Replacement Project CX(s) Applied: B4.6 Date: 06/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010427-categorical-exclusion-determination Download CX-010428: Categorical Exclusion Determination Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon

335

Circumstellar Magnetic Field Diagnostics from Line Polarization  

E-Print Network [OSTI]

Given that dynamically significant magnetic fields in at least some massive stars have now been measured, our contribution addresses the question, to what extent can fields be directly detected in circumstellar gas? The question speaks directly to the very interesting topic of line-driving physics coupled with magnetized plasmas, and how this coupling produces structure in the wind flow. We focus our attention on weak-field diagnostics. These come in two main types: the Hanle effect, which pertains to coherence effects for linear polarization from line scattering, and the weak longitudinal Zeeman effect, which pertains to circular polarization in lines.

Richard Ignace; Kenneth G. Gayley

2007-08-14T23:59:59.000Z

336

Performance evaluation of synthetically lined landfills  

SciTech Connect (OSTI)

Landfill design and performance standards for new facilities frequently require the use of geomembrane composite and double liners. Performance data from synthetically lined landfill sites have not been widely available. This report presents data obtained by monitoring three recently constructed synthetically lined landfill sites. Quantities of leachate removed by the primary and secondary collection systems from these landfills were tabulated. The data show that properly designed and constructed synthetic landfill liners provide effective containment of leachate. The environmental protection provided by synthetic liners is equivalent or superior to that of typical clay-lined facilities.

Maule, J. [Champion International Corp., Norway, MI (United States); Lowe, R.K. [STS Consultants Ltd., Green Bay, WI (United States); McCulloch, J.L. [Cross Pointe Paper Co., Park Falls, WI (United States)

1993-12-01T23:59:59.000Z

337

Definition: Tie Line Bias | Open Energy Information  

Open Energy Info (EERE)

Line Bias Line Bias Jump to: navigation, search Dictionary.png Tie Line Bias A mode of Automatic Generation Control that allows the Balancing Authority to maintain its Interchange Schedule and respond to Interconnection frequency error.[1] Related Terms Balancing Authority, Automatic Generation Control, frequency error, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Tie_Line_Bias&oldid=502569" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

338

Power line communications for smart grid applications  

Science Journals Connector (OSTI)

Power line communication, that is, using the electricity infrastructure for data transmission, is experiencing a renaissance in the context of Smart Grid. Smart Grid objectives include the integration of intermittent renewable energy sources into the ...

Lars Torsten Berger; Andreas Schwager; J. Joaquín Escudero-Garzás

2013-01-01T23:59:59.000Z

339

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

340

Transmission line modeling with explicit grounding representation  

Science Journals Connector (OSTI)

This paper presents a new model of an overhead transmission line for electromagnetic transient computations. The unique feature of the model is the explicit representation of the tower grounding configuration and terminal substation grounds. Other properties of the model are: (1) accurate frequency dependent parameter representation from DC to several MHz; (2) explicit modeling of line asymmetries; and (3) high numerical efficiency. The model implementation is based on the solution of the transmission line differential equations resulting in a set of step response functions, forming a matrix. The step response matrix is utilized in a time domain simulation of electric power networks by a linear convolution scheme. The transmission line model is validated with actual system test data. The model is useful for computing the ground potential rise of transmission towers due to lightning or switching surges, insulation stress, etc. Typical applications are described in the paper.

G.J. Cokkinides; A.P.Sakis Meliopoulos

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Effect of Mooring Lines on Ship Motions  

Science Journals Connector (OSTI)

It is commonly accepted that for open sea moorings the effect of the mooring lines on the dynamics of a vessel is restricted to the lower frequency range below the wave spectrum frequencies.

Professor Michael Triantafyllou

1988-01-01T23:59:59.000Z

342

Channelized voice over digital subscriber line  

E-Print Network [OSTI]

The objective of this article is to present a promising voice over digital subscriber line (VoDSL) solution: an alternative method that uses physical layer transportation to provide channelized VoDSL (CVoDSL). This article ...

Habib, A.; Saiedian, Hossein

2002-10-01T23:59:59.000Z

343

Molecular absorption in transition region spectral lines  

E-Print Network [OSTI]

Aims: We present observations from the Interface Region Imaging Spectrograph (IRIS) of absorption features from a multitude of cool atomic and molecular lines within the profiles of Si IV transition region lines. Many of these spectral lines have not previously been detected in solar spectra. Methods: We examined spectra taken from deep exposures of plage on 12 October 2013. We observed unique absorption spectra over a magnetic element which is bright in transition region line emission and the ultraviolet continuum. We compared the absorption spectra with emission spectra that is likely related to fluorescence. Results: The absorption features require a population of sub-5000 K plasma to exist above the transition region. This peculiar stratification is an extreme deviation from the canonical structure of the chromosphere-corona boundary . The cool material is not associated with a filament or discernible coronal rain. This suggests that molecules may form in the upper solar atmosphere on small spatial scales...

Schmit, Donald; Ayres, Thomas; Peter, Hardi; Curdt, Werner; Jaeggli, Sarah

2014-01-01T23:59:59.000Z

344

Refractory Lining Material Improves Gasifer Performance  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

line the interior of slagging gasifiers, where a carbon-based feedstock such as coal, petcoke, andor biomass, is converted at high temperatures in an oxygen-deficient environment...

345

Insulate Steam Distribution and Condensate Return Lines  

Broader source: Energy.gov [DOE]

This tip sheet on insulating steam distribution and condensate return lines provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

346

PROBING QUASAR SIGHT LINES IN THREE DIMENSIONS  

E-Print Network [OSTI]

with the spatial resolution in our datasets. For the sub-DLA galaxy towards PHL 1226, we determine a solar abundance in the emission region using strong line diagnostics. We discuss the possible presence

347

Magnetic Field Lines in Fusion Plasmas  

Science Journals Connector (OSTI)

Study of mappings as a part of Hamiltonian dynamics of magnetic field lines in plasmas were initiated by the research...1.... Actually, a fusion research in early sixties gave a huge impact on the development of ...

Sadrilla S. Abdullaev

2006-01-01T23:59:59.000Z

348

The motion of magnetic field lines  

Science Journals Connector (OSTI)

The definition and applications of the motion of magnetic lines of force are reviewed and illustrated. First ... aid to describing the evolution of a known magnetic field. It is next shown that a known velocity field

David P. Stern

1966-11-01T23:59:59.000Z

349

Insulate Steam Distribution and Condensate Return Lines  

SciTech Connect (OSTI)

This revised ITP tip sheet on insulating steam distribution and condensate return lines provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

350

On-Line Magazines, Journals, and Books  

Science Journals Connector (OSTI)

The Internet is a great source for on-line magazines, journals, and books. Several different types are obtainable, from basic text formats to interactive Web documents. Netscape makes it easy to access all of ...

Richard Raucci

1996-01-01T23:59:59.000Z

351

DNA Assembly Line for Nano-Construction  

ScienceCinema (OSTI)

Building on the idea of using DNA to link up nanoparticles scientists at Brookhaven National Lab have designed a molecular assembly line for high-precision nano-construction. Nanofabrication is essential for exploiting the unique properties of nanoparticl

Oleg Gang

2010-01-08T23:59:59.000Z

352

Balanced Atmospheric Response to Squall Lines  

Science Journals Connector (OSTI)

When a Squall line propagates through the atmosphere, it not only excite transient gravity–inertia wave motion but also produces more permanent modifications to the large-scale balanced flow. Here we calculate this balanced response using the is ...

Wayne H. Schubert; Scott R. Fulton; Rolf F. A. Herttenstein

1989-08-01T23:59:59.000Z

353

Calibration for Frequencies of Stellar Spectral Lines  

E-Print Network [OSTI]

When studying the expansion of the universe, a significant problem is measuring the red shifts of stellar absorption lines with sufficiently high accuracy; this requires extremely accurate reference frequencies for calibration. An important recent...

Gomez, Juana

2010-07-14T23:59:59.000Z

354

On the Generation of African Squall Lines  

Science Journals Connector (OSTI)

Squall lines (SLs) form an important component of the meteorology of northern Africa, and in particular, contribute substantially to rainfall totals. Their generation requires the existence of a potentially unstable low-level supply of moisture ...

David P. Rowell; James R. Milford

1993-06-01T23:59:59.000Z

355

factsheet - trees and power lines - July 2008  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Trees and power lines July 2008 This summer, BPA maintenance crews are inspecting and clearing high-growing vegetation from all 8,500- miles (15,000 circuit miles) of our...

356

Ames Lab 101: Next Generation Power Lines  

SciTech Connect (OSTI)

Ames Laboratory scientist Alan Russell discusses the need to develop new power lines that are stronger and more conductive as a way to address the problem of the nation's aging and inadequate power grid.

Russell, Alan

2010-01-01T23:59:59.000Z

357

Gila to North Gila Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gila to North Gila Transmission Line Rebuild and Upgrade Project News and updates: On March 21, 2014, Western issued a Finding of No Significant Impact for the proposed action,...

358

Synthesis of Lumped Transmission-Line Analogs  

E-Print Network [OSTI]

Transmission lines and their lumped approximating networks have long been incorporated into radio-frequency power amplifiers to improve efficiency and shape circuit waveforms and are beginning to perform a similar roles ...

Phinney, Joshua W.

359

Corona losses in HVdc bipolar lines  

SciTech Connect (OSTI)

The problem related to the prediction of corona losses in HVdc bipolar lines has been solved, in the past, by means of semi-empirical monomial formulae. However, the proposed formulae that are simpler to use do not always give adequate calculation precision, while the formulae that provide the closest results require implicit functions of different complexity, which are difficult to apply; moreover, it is not possible to understand clearly what influence the variations of the different line parameters have on the losses themselves. The new monomial semi-empirical relationship, proposed to predict the corona losses in HVdc bipolar lines, is very simple to use; it highlights the dependence of power losses due to the corona effect by the different line parameters. The formula has been developed by elaborating a considerable amount of available experimental data.

Corbellini, U.; Pelacchi, P. [Univ. of Pisa (Italy). Dept. of Electric Systems and Automation] [Univ. of Pisa (Italy). Dept. of Electric Systems and Automation

1996-07-01T23:59:59.000Z

360

Design of the ILC RTML Extraction Lines  

SciTech Connect (OSTI)

The ILC [1] Damping Ring to the Main Linac beamline (RTML) contains three extraction lines (EL). Each EL can be used both for an emergency abort dumping of the beam and tune-up continual train-by-train extraction. Two of the extraction lines are located downstream of the first and second stages of the RTML bunch compressor, and must accept both compressed and uncompressed beam with energy spreads of 2.5% and 0.15%, respectively. In this paper we report on an optics design that allowed minimizing the length of the extraction lines while offsetting the beam dumps from the main line by the distance required for acceptable radiation levels in the service tunnel. The proposed extraction lines can accommodate beams with different energy spreads while at the same time providing the beam size acceptable for the aluminum dump window. The RTML incorporates three extraction lines, which can be used for either an emergency beam abort or for a train-by-train extraction. The first EL is located downstream of the Damping Ring extraction arc. The other two extraction lines are located downstream of each stage of the two-stage bunch compressor. The first extraction line (EL1) receives 5GeV beam with an 0.15% energy spread. The extraction line located downstream of the first stage of bunch compressor (ELBC1) receives both compressed and uncompressed beam, and therefore must accept beam with both 5 and 4.88GeV energy, and 0.15% and 2.5% energy spread, respectively. The extraction line located after the second stage of the bunch compressor (ELBC2) receives 15GeV beam with either 0.15 or 1.8% energy spread. Each of the three extraction lines is equipped with the 220kW aluminum ball dump, which corresponds to the power of the continuously dumped beam with 5GeV energy, i.e., the beam trains must be delivered to the ELBC2 dump at reduced repetition rate.

Seletskiy, S.; Tenenbaum, P.; Walz, D.; /SLAC; Solyak, N.; /Fermilab

2011-10-17T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Computing Wilson lines with dielectric branes  

E-Print Network [OSTI]

Wilson lines in N=4SYM can be computed in terms of branes carrying electric flux, i.e. F-strings dissolved in their worldvolumes. It is then natural to think that those configurations are the effective description of strings expanding due to dielectric effect to D-branes. In this note we explicitly show this for a class of such configurations, namely those dual to Wilson lines either in the symmetric or in the antisymmetric tensor product of fundamentals.

Diego Rodriguez-Gomez

2006-04-05T23:59:59.000Z

362

An analysis of multiple component mooring lines  

E-Print Network [OSTI]

AN ANALYSIS OF MULTIPLE COMPONENT MOORING LINES A Thesis by THOMAS ROBERT NALTERS Submitted to the Graduate College of Texas ASM University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE December 1977 Major...'595 ABSTRACT An Analysis Of Multiple Component Mooring Lines (December 1977) Thomas Robert Walters, B. E. , Vanderbilt University Co-Chai rman of Advisory Committee: Dr. Ts ung- Chow Su Co- Chai rman of Advisory Committee: Dr. Richard Domi nguez...

Walters, Thomas Robert

2012-06-07T23:59:59.000Z

363

Relationship between System Slope and Updraft Intensity in Squall Lines  

Science Journals Connector (OSTI)

In recent years there has been debate about whether squall lines have an “optimal state.” It has been repeatedly demonstrated that the slope of a squall line’s convective region is related to the comparative magnitudes of the squall line’s cold ...

Matthew D. Parker

2010-09-01T23:59:59.000Z

364

COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING  

E-Print Network [OSTI]

COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING SYNCHRONIZED SAMPLING Nan Zhang Mladen 77843-3128, U.S.A. Abstract: A complete fault analysis scheme for long transmission line represented fault analysis tool for transmission lines is very useful for on-line confirmation and off-line trouble

365

HOT GAS LINES IN T TAURI STARS  

SciTech Connect (OSTI)

For Classical T Tauri Stars (CTTSs), the resonance doublets of N V, Si IV, and C IV, as well as the He II 1640 A line, trace hot gas flows and act as diagnostics of the accretion process. In this paper we assemble a large high-resolution, high-sensitivity data set of these lines in CTTSs and Weak T Tauri Stars (WTTSs). The sample comprises 35 stars: 1 Herbig Ae star, 28 CTTSs, and 6 WTTSs. We find that the C IV, Si IV, and N V lines in CTTSs all have similar shapes. We decompose the C IV and He II lines into broad and narrow Gaussian components (BC and NC). The most common (50%) C IV line morphology in CTTSs is that of a low-velocity NC together with a redshifted BC. For CTTSs, a strong BC is the result of the accretion process. The contribution fraction of the NC to the C IV line flux in CTTSs increases with accretion rate, from {approx}20% to up to {approx}80%. The velocity centroids of the BCs and NCs are such that V{sub BC} {approx}> 4 V{sub NC}, consistent with the predictions of the accretion shock model, in at most 12 out of 22 CTTSs. We do not find evidence of the post-shock becoming buried in the stellar photosphere due to the pressure of the accretion flow. The He II CTTSs lines are generally symmetric and narrow, with FWHM and redshifts comparable to those of WTTSs. They are less redshifted than the CTTSs C IV lines, by {approx}10 km s{sup -1}. The amount of flux in the BC of the He II line is small compared to that of the C IV line, and we show that this is consistent with models of the pre-shock column emission. Overall, the observations are consistent with the presence of multiple accretion columns with different densities or with accretion models that predict a slow-moving, low-density region in the periphery of the accretion column. For HN Tau A and RW Aur A, most of the C IV line is blueshifted suggesting that the C IV emission is produced by shocks within outflow jets. In our sample, the Herbig Ae star DX Cha is the only object for which we find a P-Cygni profile in the C IV line, which argues for the presence of a hot (10{sup 5} K) wind. For the overall sample, the Si IV and N V line luminosities are correlated with the C IV line luminosities, although the relationship between Si IV and C IV shows large scatter about a linear relationship and suggests that TW Hya, V4046 Sgr, AA Tau, DF Tau, GM Aur, and V1190 Sco are silicon-poor, while CV Cha, DX Cha, RU Lup, and RW Aur may be silicon-rich.

Ardila, David R. [NASA Herschel Science Center, California Institute of Technology, MC 100-22, Pasadena, CA 91125 (United States); Herczeg, Gregory J. [Kavli Institute for Astronomy and Astrophysics, Peking University, Beijing 100871 (China); Gregory, Scott G.; Hillenbrand, Lynne A. [Cahill Center for Astronomy and Astrophysics, California Institute of Technology, MC 249-17, Pasadena, CA 91125 (United States); Ingleby, Laura; Bergin, Edwin; Bethell, Thomas; Calvet, Nuria [Department of Astronomy, University of Michigan, 830 Dennison Building, 500 Church Street, Ann Arbor, MI 48109 (United States); France, Kevin; Brown, Alexander [Center for Astrophysics and Space Astronomy, University of Colorado, Boulder, CO 80309-0389 (United States); Edwards, Suzan [Department of Astronomy, Smith College, Northampton, MA 01063 (United States); Johns-Krull, Christopher [Department of Physics and Astronomy, Rice University, Houston, TX 77005 (United States); Linsky, Jeffrey L. [JILA, University of Colorado and NIST, 440 UCB Boulder, CO 80309-0440 (United States); Yang, Hao [Institute for Astrophysics, Central China Normal University, Wuhan 430079 (China); Valenti, Jeff A. [Space Telescope Science Institute, 3700 San Martin Drive, Baltimore, MD 21218 (United States); Abgrall, Herve [LUTH and UMR 8102 du CNRS, Observatoire de Paris, Section de Meudon, Place J. Janssen, F-92195 Meudon (France); Alexander, Richard D. [Department of Physics and Astronomy, University of Leicester, University Road, Leicester LE1 7RH (United Kingdom); Brown, Joanna M.; Espaillat, Catherine [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, MS 78, Cambridge, MA 02138 (United States); Hussain, Gaitee, E-mail: ardila@ipac.caltech.edu [ESO, Karl-Schwarzschild-Strasse 2, D-85748 Garching bei Muenchen (Germany); and others

2013-07-01T23:59:59.000Z

366

On-site rubber lining -- Application of precured and self-curing rubber linings  

SciTech Connect (OSTI)

Rubber linings are applied as a corrosion protection system in a wide range of plants and installations of the industrial sector. In addition to the execution of lining works in a workshop, the on-site application of this corrosion protection system on the construction site has gained increasing importance. The various procedures utilized to apply the corrosion protection linings will be briefly presented in the following paper. In particular the precured and self curing rubber linings together with their scope of use and application on construction sites will be described in more detail.

Fenner, J. [Keramchemie GmbH, Siershahn (Germany)

1998-12-31T23:59:59.000Z

367

A high accuracy computed water line list  

E-Print Network [OSTI]

A computed list of H$_{2}$$^{16}$O infra-red transition frequencies and intensities is presented. The list, BT2, was produced using a discrete variable representation two-step approach for solving the rotation-vibration nuclear motions. It is the most complete water line list in existence, comprising over 500 million transitions (65% more than any other list) and it is also the most accurate (over 90% of all known experimental energy levels are within 0.3 cm$^{-1}$ of the BT2 values). Its accuracy has been confirmed by extensive testing against astronomical and laboratory data. The line list has been used to identify individual water lines in a variety of objects including: comets, sunspots, a brown dwarf and the nova-like object V838 Mon. Comparison of the observed intensities with those generated by BT2 enables physical values to be derived for these objects. The line list can also be used to provide an opacity for models of the atmospheres of M-dwarf stars and assign previously unknown water lines in laboratory spectra.

R. J. Barber; J. Tennyson; G. J. Harris; R. N. Tolchenov

2006-01-11T23:59:59.000Z

368

Quantification of line tracking solutions for automotive applications  

Science Journals Connector (OSTI)

Unlike line tracking in automotive painting applications, line tracking for automotive general assembly applications requires position tracking in order to perform assembly operations to a required assembly tolerance. Line tracking quantification experiments ... Keywords: position tracking performance

Jane Shi; Rick F. Rourke; Dave Groll; Peter W. Tavora

2008-08-01T23:59:59.000Z

369

Energy Jobs: Utility Line Worker | Department of Energy  

Energy Savers [EERE]

Utility Line Worker Energy Jobs: Utility Line Worker October 21, 2014 - 1:10pm Addthis Line workers get hands-on experience with an electrical pole as part of their training. |...

370

International reserves and swap lines: substitutes or complements?  

E-Print Network [OSTI]

Reserves, and Central Bank Swap Lines in the Panic of 2008."reserves and swap lines: substitutes or complements? *We explore whether such swap lines can reduce the need for

Aizenman, Joshua; Jinjarak, Yothin; Park, Donghyun

2010-01-01T23:59:59.000Z

371

International reserves and swap lines: substitutes or complements? *  

E-Print Network [OSTI]

Reserves, and Central Bank Swap Lines in the Panic of 2008."reserves and swap lines: substitutes or complements? *We explore whether such swap lines can reduce the need for

Aizenman, Joshua; Jinjarak, Yothin; PARK, Donghyun Dr.

2010-01-01T23:59:59.000Z

372

Injection and Extraction Lines for the ILC Damping Rings  

E-Print Network [OSTI]

INJECTION AND EXTRACTION LINES FOR THE ILC DAMPING RINGS ?the injection and extraction lines into and out of the ILCas the design for the abort line. Due to changes of the geo-

Reichel, Ina

2008-01-01T23:59:59.000Z

373

Mechanical Factors in the Excitation of Clupeid Lateral Lines  

Science Journals Connector (OSTI)

...Factors in the Excitation of Clupeid Lateral Lines E. J. Denton John Gray The excitation of lateral line sense organs (neuromasts) might be expected...between the liquid inside the main lateral line canals (the ones that contain the neuromasts...

1983-01-01T23:59:59.000Z

374

Prediction of epigenetically regulated genes in breast cancer cell lines  

E-Print Network [OSTI]

in breast cancer cell lines Leandro A. Loss ?1 , Angurajof breast cancer cell lines for the study of functionallyof 45 breast cancer cell lines, which is widely used in the

Loss, Leandro A

2010-01-01T23:59:59.000Z

375

MORPHOMETRIC SUBTYPING FOR A PANEL OF BREAST CANCER CELL LINES  

E-Print Network [OSTI]

the incubation of each line in the panel, which indicatespanel of breast cell lines were computed, and subpopulationsto a data set of 41 cell lines grown in 2D cell culture

Han, Ju

2009-01-01T23:59:59.000Z

376

Lines of Circular Polarization in Electromagnetic Wave Fields  

Science Journals Connector (OSTI)

8 October 1983 research-article Lines of Circular Polarization in Electromagnetic Wave Fields J...free space possesses, in general, two families of singular lines ( lines) on which the transverse field is circularly polarized. The...

1983-01-01T23:59:59.000Z

377

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network [OSTI]

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

378

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network [OSTI]

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

379

ASYMMETRIC DIFFUSION OF MAGNETIC FIELD LINES  

SciTech Connect (OSTI)

Stochasticity of magnetic field lines is important for particle transport properties. Magnetic field lines separate faster than diffusively in turbulent plasma, which is called superdiffusion. We discovered that this superdiffusion is pronouncedly asymmetric, so that the separation of field lines along the magnetic field direction is different from the separation in the opposite direction. While the symmetry of the flow is broken by the so-called imbalance or cross-helicity, the difference between forward and backward diffusion is not directly due to imbalance, but a non-trivial consequence of both imbalance and non-reversibility of turbulence. The asymmetric diffusion perpendicular to the mean magnetic field entails a variety of new physical phenomena, such as the production of parallel particle streaming in the presence of perpendicular particle gradients. Such streaming and associated instabilities could be significant for particle transport in laboratory, space, and astrophysical plasmas.

Beresnyak, Andrey [Los Alamos National Laboratory, Los Alamos, NM 87545 (United States)

2013-04-20T23:59:59.000Z

380

Axial power loss along open field lines  

SciTech Connect (OSTI)

Studies are underway to evaluate the linear mirror geometry as a candidate for a high-fluence, neutron irradiation facility. This steady-state, low-Q design is currently perceived to comprise a two-component plasma driven by neutral beams with mirror confinement of the hot ions and with no electrostatic axial reduction in the warm ion end losses. Warm-ion fueling and end-wall power density will require substantial cold plasma exterior to the mirror cell and neutral gas near the end wall. In this paper, we evaluate to what extent the loss power parallel to the axial magnetic field along open field lines is a function of the escaping plasma and end-wall parameters. By allowing the source power to depend directly on the plasma density and electron temperature, several new conclusions may be pertinent to closed field-line geometries with open field-line divertors.

Correll, D.L.

1987-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Dynamic Line Rating: Research and Policy Evaluation  

SciTech Connect (OSTI)

Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of electrical conductors to be increased based on local weather conditions. Overhead lines are conventionally given a conservative rating based on worst case scenarios. We demonstrate that observing the conditions in real time leads to additional capacity and safer operation. This paper provides a report of a pioneering scheme in the United States of America in which DLR has been applied. Thereby, we demonstrate that observing the local weather conditions in real time leads to additional capacity and safer operation. Secondly, we discuss limitations involved. In doing so, we arrive at novel insights which will inform and improve future DLR projects. Third, we provide a policy background and discussion to clarify the technology’s potential and identifies barriers to the imminent adoption of dynamic line rating systems. We provide suggestions for regulatory bodies about possible improvements in policy to encourage adoption of this beneficial technology.

Jake P. Gentle; Kurt S. Myers; Michael R. West

2014-07-01T23:59:59.000Z

382

Displaced Vertices from X-ray Lines  

E-Print Network [OSTI]

We present a simple model of weak-scale thermal dark matter that gives rise to X-ray lines. Dark matter consists of two nearly degenerate states near the weak scale, which are populated thermally in the early universe via co-annihilation with slightly heavier states that are charged under the Standard Model. The X-ray line arises from the decay of the heavier dark matter component into the lighter one via a radiative dipole transition, at a rate that is slow compared to the age of the universe. The model predicts observable signatures at the LHC in the form of exotic events with missing energy and displaced leptons and jets. As an application, we show how this model can explain the recently observed 3.55 keV X-ray line.

Adam Falkowski; Yonit Hochberg; Joshua T. Ruderman

2014-09-09T23:59:59.000Z

383

Electric Transmission Lines (Nebraska) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

384

Stark broadening of Kr UV spectral lines  

Science Journals Connector (OSTI)

This work reports new data for the Stark parameters of doubly ionized krypton spectral lines. Stark widths and shifts of Kr iii lines belonging to the UV region (245–300 nm) have been measured. A low-pressure pulsed arc, containing a mixture of 8% krypton and 92% helium, was used as a plasma source. Measured electron densities and electron temperatures were in the range (0.7–2.0)×1023 m-3 and 16 000–20 000 K, respectively. Experimentally obtained data were compared to theoretical results calculated using simplified modified semiempirical formulas.

M. ?irišan; R. J. Peláez; S. Djurovi?; J. A. Aparicio; S. Mar

2011-01-24T23:59:59.000Z

385

Open Wilson lines and group theory of  

Science Journals Connector (OSTI)

The correlation functions of open Wilson line operators in two-dimensional Yang-Mills theory on the noncommutative torus are computed exactly. The correlators are expressed in two equivalent forms. An instanton expansion involves only topological numbers of Heisenberg modules and enables extraction of the weak-coupling limit of the gauge theory. A dual algebraic expansion involves only group theoretic quantities, winding numbers and translational zero modes, and enables analysis of the strong-coupling limit of the gauge theory and the high-momentum behaviour of open Wilson lines. The dual expressions can be interpreted physically as exact sums over contributions from virtual electric dipole quanta.

Lori D. Paniak; Richard J. Szabo

2003-01-01T23:59:59.000Z

386

Straight-line separation of two polyhedra  

E-Print Network [OSTI]

STRAIGHT-LINE SEPARATION OF TWO POLYHEDRA A Thesis by SU-HUA WANG Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE December 1992 Major Subject...: Computer Science STRAIGHT-LINE SEPARATION OF TWO POLYHEDRA A Thesis by SU-HUA WANG Approved as to style and content by: Jan Wolter hair of Committee) Donald K. Friesen (Member) esa O. alav ( ember) Richard A, Volz (Head of Department) December...

Wang, Su-Hua

1992-01-01T23:59:59.000Z

387

Ionization Chambers in the FLASH Dump Line  

E-Print Network [OSTI]

. 7, 2010FLASH Seminar, Dec. 7, 2010 BPM 13DUMP Dump Line Upgrade 2009Dump Line Upgrade 2009 BPM 9DUMP BPM 5DUMP Toroid 9DUMP OTR screen 9DUMP BLM 14DUMP BLM 13.1DUMP 13.2DUMP BLM 9DUMP BLM 6DUMP BLM 1.1DUMP 1.2DUMP BPM 10DUMP BPM 16DUMP 8 x BHM 16DUMP BLM 14R.DUMP 14L.DUMP 14U.DUMP 14D.DUMP Ionization

388

Boron-10 Lined Proportional Counter Wall Effects  

SciTech Connect (OSTI)

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project 'Coincidence Counting With Boron-Based Alternative Neutron Detection Technology' at Pacific Northwest National Laboratory (PNNL) for development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube based system in the configuration of a coincidence counter. This report provides information about how variations in proportional counter radius and gas pressure in a typical coincident counter design might affect the observed signal from boron-lined tubes. A discussion comparing tubes to parallel plate counters is also included.

Siciliano, Edward R.; Kouzes, Richard T.

2012-05-01T23:59:59.000Z

389

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

390

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42)  

Broader source: Energy.gov (indexed) [DOE]

5, 2002 5, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-42) Don Atkinson - TFN/Snohomish Bob Sweet - TFNF/Snohomish Proposed Action: Vegetation Management along the Snohomish - Murray #1 from str 1\4 to str 18\5. The proposed work will be to remove both danger and reclaim trees outside and inside the right-of-way, respectively. Right-of-way width varies from 125 to 300 feet. Location: The ROW is located in Snohomish County, WA, being in the Snohomish Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposed Action: BPA proposes to remove both reclaim and danger trees inside and outside the transmission line right of way. BPA crews or contract crews will cut only trees that have

391

SN Environmental Review (NEPA)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rates Rates You are here: SN Home page > Environment Environmental Review-NEPA Major Initiatives are the large projects that SNR is currently involved in. As new projects are added, and existing ones completed, you will find current information and updates in this area. Environmental Impact Statement-EIS Sacramento Area Voltage Support Trinity PUD Interconnection Projects Alternative Intake Project Transmission Line and Interconnection Delta-Mendota Canal / California Aqueduct Intertie (PDF - 17MB) Sutter Power Project San Luis Transmission Project Environmental Assessment-EA San Joaquin Valley Right-of-Way Maintenance Project North Area Right-of-Way Maintenance Project Sacramento Valley Right-of-Way Maintenance Project Categorical Exclusions-CX Cottonwood - Roseville OPGW Project CX (PDF - 6787KB)

392

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

393

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers [EERE]

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

394

Mitsui O S K Lines Ltd | Open Energy Information  

Open Energy Info (EERE)

Lines Ltd Jump to: navigation, search Name: Mitsui O.S.K. Lines Ltd Place: Tokyo, Japan Zip: 1058688 Sector: Services Product: A shipping company, with services including...

395

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

396

Nonmonotone line search methods with variable sample size  

E-Print Network [OSTI]

The nonmonotone line search framework is embedded with a variable sample size ... the line search combines well with the variable sample size scheme as.

2014-02-17T23:59:59.000Z

397

Request for Information on Permitting of Transmission Lines:...  

Broader source: Energy.gov (indexed) [DOE]

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

398

Independent Oversight Evaluation of Line Self-Assessments of...  

Broader source: Energy.gov (indexed) [DOE]

Evaluation of Line Self-Assessments of Safety Conscious Work Environment - February 2014 Independent Oversight Evaluation of Line Self-Assessments of Safety Conscious Work...

399

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...  

Energy Savers [EERE]

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary...

400

Letter from Deputy Secretary Poneman to Clean Line Energy Regarding...  

Office of Environmental Management (EM)

Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Advance...

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers [EERE]

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

402

Amended Notice of Intent for the Northern Pass Transmission Line...  

Broader source: Energy.gov (indexed) [DOE]

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

403

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Broader source: Energy.gov (indexed) [DOE]

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

404

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Broader source: Energy.gov (indexed) [DOE]

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

405

Inbred lines of mice derived from long-term growth selected lines: unique resources for mapping growth genes  

Science Journals Connector (OSTI)

Lines of mice selected for many generations for ... have been collected, and from these, inbred lines are being developed by recurrent full-sib ... in Edinburgh. There are seven high selected lines and four low

Lutz Bünger; Anita Laidlaw; Grahame Bulfield; Eugene J. Eisen…

2001-09-01T23:59:59.000Z

406

Abstract--Power Line Communications (PLC) is used for information exchange over the lines  

E-Print Network [OSTI]

Abstract-- Power Line Communications (PLC) is used for information exchange over the lines installed for delivering the electrical power. Inhome PLC is a technology which delivers telecom services to every corner of a household through already existing electrical wiring. In recent years, PLC has emerged

Boyer, Edmond

407

The Mean Number of Extreme Lines in a Convex Hull of Lines  

Science Journals Connector (OSTI)

The dual problem of the mean number of extreme lines among n...chosen at random from a convex polygon of lines is defined, evaluations made for n=4 , 6, 20 and the asymptotic mean are shown to be the same as in t...

Gates

2002-01-01T23:59:59.000Z

408

MICROLENSING OF QUASAR BROAD EMISSION LINES: CONSTRAINTS ON BROAD LINE REGION SIZE  

SciTech Connect (OSTI)

We measure the differential microlensing of the broad emission lines between 18 quasar image pairs in 16 gravitational lenses. We find that the broad emission lines are in general weakly microlensed. The results show, at a modest level of confidence (1.8{sigma}), that high ionization lines such as C IV are more strongly microlensed than low ionization lines such as H{beta}, indicating that the high ionization line emission regions are more compact. If we statistically model the distribution of microlensing magnifications, we obtain estimates for the broad line region size of r{sub s} = 24{sup +22} {sub -15} and r{sub s} = 55{sup +150} {sub -35} lt-day (90% confidence) for the high and low ionization lines, respectively. When the samples are divided into higher and lower luminosity quasars, we find that the line emission regions of more luminous quasars are larger, with a slope consistent with the expected scaling from photoionization models. Our estimates also agree well with the results from local reveberation mapping studies.

Guerras, E.; Mediavilla, E. [Instituto de Astrofisica de Canarias, Via Lactea S/N, La Laguna E-38200, Tenerife (Spain)] [Instituto de Astrofisica de Canarias, Via Lactea S/N, La Laguna E-38200, Tenerife (Spain); Jimenez-Vicente, J. [Departamento de Fisica Teorica y del Cosmos, Universidad de Granada, Campus de Fuentenueva, E-18071 Granada (Spain)] [Departamento de Fisica Teorica y del Cosmos, Universidad de Granada, Campus de Fuentenueva, E-18071 Granada (Spain); Kochanek, C. S. [Department of Astronomy and the Center for Cosmology and Astroparticle Physics, The Ohio State University, 4055 McPherson Lab, 140 West 18th Avenue, Columbus, OH 43221 (United States)] [Department of Astronomy and the Center for Cosmology and Astroparticle Physics, The Ohio State University, 4055 McPherson Lab, 140 West 18th Avenue, Columbus, OH 43221 (United States); Munoz, J. A. [Departamento de Astronomia y Astrofisica, Universidad de Valencia, E-46100 Burjassot, Valencia (Spain)] [Departamento de Astronomia y Astrofisica, Universidad de Valencia, E-46100 Burjassot, Valencia (Spain); Falco, E. [Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States)] [Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Motta, V. [Departamento de Fisica y Astronomia, Universidad de Valparaiso, Avda. Gran Bretana 1111, Valparaiso (Chile)] [Departamento de Fisica y Astronomia, Universidad de Valparaiso, Avda. Gran Bretana 1111, Valparaiso (Chile)

2013-02-20T23:59:59.000Z

409

Student On Line Access to Records Provides on-line, self service access to  

E-Print Network [OSTI]

SOLAR Student On Line Access to Records #12;Provides on-line, self service access to: Registrar Enrollment Appointments · Review Solar Messages Student Account/ Financial Aid: · View Support offered (available aid ­ i.e. Federal loans, scholarships, etc.) · Accept financial aid (i.e. loans, etc.) ­ loan

410

Berkeley Off-line Radioisotope Generator (BORG)  

SciTech Connect (OSTI)

Development of chemical separations for the transactinides has traditionally been performed with longer-lived tracer activities purchased commercially. With these long-lived tracers, there is always the potential problem that the tracer atoms are not always in the same chemical form as the short-lived atoms produced in on-line experiments. This problem is especially severe for elements in groups 4 and 5 of the periodic table, where hydrolysis is present. The long-lived tracers usually are stored with a complexing agent to prevent sorption or precipitation. Chemistry experiments performed with these long-lived tracers are therefore not analogous to those chemical experiments performed in on-line experiments. One way to eliminate the differences between off-line and on-line chemistry experiments is through the use of a {sup 252}Cf fission fragment collection device. A {sup 252}Cf fission fragment collection device has already been constructed [1]. This device is limited in its capabilities. A new fission fragment device would allow the study of the chemical properties of the homologues of the heaviest elements. This new device would be capable of producing fission fragments for fast gas chemistry and aqueous chemistry experiments, long-lived tracers for model system development and neutrons for neutron activation. Fission fragment activities produced in this way should have the same chemical form as those produced in Cyclotron irradiations. The simple operation of this source will allow more rapid and reliable development of radiochemical separations with homologues of transactinide elements.

Sudowe, Ralf; Patin, Joshua B.

2001-07-23T23:59:59.000Z

411

High temperature lined conduits, elbows and tees  

DOE Patents [OSTI]

A high temperature lined conduit comprising, a liner, a flexible insulating refractory blanket around and in contact with the liner, a pipe member around the blanket and spaced therefrom, and castable rigid refractory material between the pipe member and the blanket. Anchors are connected to the inside diameter of the pipe and extend into the castable material. The liner includes male and female slip joint ends for permitting thermal expansion of the liner with respect to the castable material and the pipe member. Elbows and tees of the lined conduit comprise an elbow liner wrapped with insulating refractory blanket material around which is disposed a spaced elbow pipe member with castable refractory material between the blanket material and the elbow pipe member. A reinforcing band is connected to the elbow liner at an intermediate location thereon from which extend a plurality of hollow tubes or pins which extend into the castable material to anchor the lined elbow and permit thermal expansion. A method of fabricating the high temperature lined conduit, elbows and tees is also disclosed which utilizes a polyethylene layer over the refractory blanket after it has been compressed to maintain the refractory blanket in a compressed condition until the castable material is in place. Hot gases are then directed through the interior of the liner for evaporating the polyethylene and setting the castable material which permits the compressed blanket to come into close contact with the castable material.

De Feo, Angelo (Passaic, NJ); Drewniany, Edward (Bergen, NJ)

1982-01-01T23:59:59.000Z

412

House Rejects Southern Idaho Power Line  

Science Journals Connector (OSTI)

The House of Representatives has refused to go along with the Bonneville Power Administration's plans to build a power transmission line into southern Idaho, where Monsanto hopes to use part of the power in a planned expansion of its elemental phosphorus ...

1964-06-22T23:59:59.000Z

413

Holomorphic Structures on the Quantum Projective Line  

Science Journals Connector (OSTI)

......Projective Line Masoud Khalkhali 1 Giovanni Landi 2 3 Walter Daniel van Suijlekom 4 Correspondence to be sent to: waltervs@math...Modern Physics Letters A (2003) 18:2371-80. 13 Dubois-Violette M. , Masson T. On the first-order operators in bimodules......

Masoud Khalkhali; Giovanni Landi; Walter Daniël van Suijlekom

2011-01-01T23:59:59.000Z

414

Experiments on Magnetic-Field-Line Reconnection  

Science Journals Connector (OSTI)

In a very large laboratory plasma the process of magnetic-field-line reconnection has been diagnosed carefully. The temporal evolution of a narrow (?3c?pe) neutral layer with Petschek slow shocks is observed. Electrostatic fields are found to be as important as induced electric fields.

R. L. Stenzel and W. Gekelman

1979-04-16T23:59:59.000Z

415

Vortex lines in films: Fields and interactions  

Science Journals Connector (OSTI)

General expressions are given for the magnetic field and energy of arbitrary arrangements of straight and curved vortices in an anisotropic superconductor film of finite thickness within anisotropic London theory. As examples we consider the magnetic field and interaction of straight perpendicular vortex lines in films of finite thickness.

Gilson Carneiro and Ernst Helmut Brandt

2000-03-01T23:59:59.000Z

416

The Bottom Line Space@Penn Upgrade  

E-Print Network [OSTI]

The Bottom Line Space@Penn Upgrade Coming Soon! A project is underway to upgrade the current that allows designated users in the field to update certain elements of their space. This project, whose: Grants & Projects ­ Used for invoice generation, overhead and revenue recognition, and award and project

Sharp, Kim

417

Supersonic line broadening in accretion discs  

Science Journals Connector (OSTI)

......Dhillon the dwarf nova 0 Y Car (Home et al. 1994...ions will be in the lower energy state, and therefore...iron curtain' in OY Car (Home et al. 1994...perhaps the most obvious alternative. Ifwe assume that the...spectra of the dwarf nova OY Car suggest that the line......

T. R. Marsh; V. S. Dhillon

1997-12-01T23:59:59.000Z

418

Connecticut ponders fuel cells for rail line  

Science Journals Connector (OSTI)

The Connecticut Department of Transportation is studying how fuel cell technology could be used to power trains and stations on Metro-North Railroad's New Haven Line. According to a report in The Stamford Advocate, the DOT wants to determine whether a fuel cell power station could replace some of the electric substations now used, taking the strain off Fairfield County's power grid.

2007-01-01T23:59:59.000Z

419

Dielectronic recombination lines of C{sup +}  

SciTech Connect (OSTI)

The present paper presents atomic data generated to investigate the recombination lines of C II in the spectra of planetary nebulae. These data include energies of bound and autoionizing states, oscillator strengths and radiative transition probabilities, autoionization probabilities, and recombination coefficients. The R-matrix method of electron scattering theory was used to describe the C{sup 2+} plus electron system.

Sochi, Taha, E-mail: taha.sochi@kcl.ac.uk; Storey, Peter J.

2013-11-15T23:59:59.000Z

420

Molecular Evolutionary Analysis of Cancer Cell Lines  

Science Journals Connector (OSTI)

...flow diagram of the DNA sequence analysis pipeline. For the cell lines we sequenced, comparisons...manner as a consequence of impaired DNA repair and apoptosis processes). Evolutionary...47-55. 49 Varley KE , Mitra RD. Nested Patch PCR enables highly multiplexed mutation...

Yan Zhang; Michael J. Italia; Kurt R. Auger; Wendy S. Halsey; Stephanie F. Van Horn; Ganesh M. Sathe; Michal Magid-Slav; James R. Brown; and Joanna D. Holbrook

2010-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Tassel Pipeline Tutorial (Command Line Interface)  

E-Print Network [OSTI]

Tassel Pipeline Tutorial (Command Line Interface) Terry Casstevens Institute for Genomic Diversity, Cornell University May 11, 2011 #12;Tassel Pipeline Basics... · Consists of Modules (i.e. Plugins) · Output from one Module can be Input to another Module. Determined by order specified. run_pipeline

Buckler, Edward S.

422

Entropy Adaptive On-Line Compression  

Science Journals Connector (OSTI)

Self-Organization is based on adaptivity. Adaptivity should start with the very basic fundamental communication tasks such as encoding the information to be transmitted or stored. Obviously, the less signal transmitted the less energy in transmission ... Keywords: On-line compression, adaptive compression

Shlomi Dolev, Sergey Frenkel, Marina Kopeetsky

2014-08-01T23:59:59.000Z

423

LINE-INTERLOCKING EFFECTS ON POLARIZATION IN SPECTRAL LINES BY RAYLEIGH AND RAMAN SCATTERING  

SciTech Connect (OSTI)

The polarized spectrum of the Sun and stars is formed from the scattering of anisotropic radiation on atoms. Interpretation of this spectrum requires the solution of polarized line transfer in multilevel atomic systems. While sophisticated quantum theories of polarized line formation in multilevel atomic systems exist, they are limited by the approximation of complete frequency redistribution in scattering. The partial frequency redistribution (PRD) in line scattering is a necessary component in modeling the polarized spectra of strong lines. The polarized PRD line scattering theories developed so far confine themselves to a two-level or a two-term atom model. In this paper, we present a heuristic approach to the problem of polarized line formation in multilevel atoms taking into account the effects of PRD and a weak magnetic field. Starting from the unpolarized PRD multilevel atom approach of Hubeny et al., we incorporate the polarization state of the radiation field. However, the lower level polarization is neglected. Two iterative methods of solving the polarized PRD line transfer in multilevel atoms are also presented. Taking the example of a five-level Ca II atom model, we present illustrative results for an isothermal one-dimensional model atmosphere.

Sampoorna, M.; Nagendra, K. N. [Indian Institute of Astrophysics, Koramangala, Bangalore 560 034 (India); Stenflo, J. O., E-mail: sampoorna@iiap.res.in, E-mail: knn@iiap.res.in, E-mail: stenflo@astro.phys.ethz.ch [Institute of Astronomy, ETH Zurich, CH-8093 Zurich (Switzerland)

2013-06-20T23:59:59.000Z

424

A CURRENT CONTROLLED VARIABLE DELAY SUPERCONDUCTING TRANSMISSION LINE  

E-Print Network [OSTI]

I I I I 1388 A CURRENT CONTROLLED VARIABLE DELAY SUPERCONDUCTING TRANSMISSION LINE S. M. Anlage, H line. The device makes use of the change in kinetic inductance of a superconducting transmission line, fabrication of transmission lines with such films provides the means for constructing a continuously variable

Anlage, Steven

425

Exponential asymptotics and Stokes lines in a partial differential equation  

Science Journals Connector (OSTI)

...higher-order Stokes line. exponential asymptotics|Stokes lines|Stokes smoothing|Borel plane...and subdominant exponentials may be identified...this expansion and smoothing the Stokes lines...performed the Stokes smoothing and identified...Stokes lines and the exponentials they switch on...

2005-01-01T23:59:59.000Z

426

FTA- SunLine Transit Agency- Final Report  

Broader source: Energy.gov [DOE]

Final Report on the Federal Transit Administration, SunLine Transit Agency Cooperative Agreement (Part One)

427

http://sunearthday.nasa.gov Exploring Magnetic Field Lines  

E-Print Network [OSTI]

http://sunearthday.nasa.gov Exploring Magnetic Field Lines About this Activity When discussing". Left: Two participants tracing magnetic field lines. Below: Magnetic field line tracings of a bar more field lines. Public Outreach - Make and Take Activities What You'll Need Alnico bar magnets 1

428

CX-011183: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Determination CX-011183: Categorical Exclusion Determination Line Upgrade on Bonneville Power Administration's Walla Walla-Pendleton Number 1 Transmission Line CX(s) Applied: B1.3...

429

CX-011717: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

CX-011717: Categorical Exclusion Determination Line 3002 and 3002A Electrical Transmission Line Reconductoring Project CX(s) Applied: B2.5 Date: 05222013 Location(s):...

430

Comparing the performace of f1 testers versus their inbred line parents in evaluating experimental sorghum b and r lines in testcrosses.  

E-Print Network [OSTI]

An appropriate tester correctly identifies the relative performance of experimental lines while maximizing the differences between lines. Most sorghum breeding programs use elite inbred lines testers. Inbred line testers evaluate experimental lines...

Packer, Daniel Jacob

2009-05-15T23:59:59.000Z

431

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Broader source: Energy.gov (indexed) [DOE]

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) 2013 Annual Planning Summary for the Southwestern Area Power Administration

432

Alaskan Oil: Court Ruling Revives Canada Pipeline Issue  

Science Journals Connector (OSTI)

...48-inch hot oil pipeline-the largest ever-from...integrity of the pipeline from potential earthquakes...the pi,peline design. For their part...State-ment on the pipeline project would have...for a pipe-line crossing the federal domain...and its service road a right-of-way...

Luther J. Carter

1973-03-09T23:59:59.000Z

433

EPR Line Shifts and Line Shape Changes due to Spin Exchange of Nitroxide Free Radicals in Liquids: 6. Separating Line Broadening due to Spin Exchange and Dipolar Interactions  

E-Print Network [OSTI]

EPR Line Shifts and Line Shape Changes due to Spin Exchange of Nitroxide Free Radicals in Liquids 23, 2008; ReVised Manuscript ReceiVed: January 12, 2009 EPR spectra of perdeuterated 2

Bales, Barney

434

Definition: Line Transformer Monitors | Open Energy Information  

Open Energy Info (EERE)

Transformer Monitors Transformer Monitors Jump to: navigation, search Dictionary.png Line Transformer Monitors Transformer Monitoring System can monitor different aspects of transformers, including oil levels and multiple temperatures within the transformer. This allows for analysis of the health of either individual key power transformers or multiple power transformers networked in the system. For example, the transformer monitors provide transformer oil dissolved gas analysis (DGA), oil temperature, ambient temperature, and moisture in oil measurements. These measurements are made in relation to transformer load.[1] Related Terms transformer, system, transformer References ↑ https://www.smartgrid.gov/category/technology/line_transformer_monitors [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like.

435

LINE Commission Visits Idaho National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how it worked. Participants included, from top right in the INL: INL Laboratory Director John Grossenbacher; North Wind Group President Sylvia Median; former Idaho U.S. Senator Larry Craig; Idaho Department of Labor�s Dwight Johnson; BEA Government Affairs Boise Manager Brian Whitlock; and Idaho House District 33 Rep. Jeff Thompson.

436

Multi-transmission-line-beam interactive system  

SciTech Connect (OSTI)

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube due to J. R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Figotin, Alexander; Reyes, Guillermo [Department of Mathematics, University of California at Irvine, Irvine, California 92697-3875 (United States)] [Department of Mathematics, University of California at Irvine, Irvine, California 92697-3875 (United States)

2013-11-15T23:59:59.000Z

437

Boron-10 Lined Proportional Counter Model Validation  

SciTech Connect (OSTI)

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project “Coincidence Counting With Boron-Based Alternative Neutron Detection Technology” at Pacific Northwest National Laboratory (PNNL) for the development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube-based alternative system in the configuration of a coincidence counter. This report discusses the validation studies performed to establish the degree of accuracy of the computer modeling methods current used to simulate the response of boron-lined tubes. This is the precursor to developing models for the uranium neutron coincidence collar under Task 2 of this project.

Lintereur, Azaree T.; Siciliano, Edward R.; Kouzes, Richard T.

2012-06-30T23:59:59.000Z

438

Reliability of lightning resistant overhead distribution lines  

SciTech Connect (OSTI)

An assessment of the 32 year historical reliability of the 13.8 kV electrical distribution system at the Oak Ridge National Laboratory (ORNL) in Tennessee has yielded several conclusions useful In the planning of Industrial power Systems. The system configuration at ORNL has essentially remained unchanged in the last 32 years which allows a meaningful comparison of reliability trends for the plant`s eight overhead distribution lines, two of which were built in the 1960`s with lightning resistant construction techniques. Meticulous records indicating the cause, duration, and location of 135 electric outages in the plant`s distribution system have allowed a reliability assessment to be performed. The assessment clearly shows how differences in voltage construction class, length, age, and maximum elevation above a reference elevation influence the reliability of overhead power distribution lines. Comparisons are also made between the ORNL historical data and predicted failure rates from ANSI and IEEE industry surveys.

Tolbert, L.M.; Cleveland, J.T.; Degenhardt, L.J.

1995-04-01T23:59:59.000Z

439

ADHM Revisited: Instantons and Wilson Lines  

E-Print Network [OSTI]

We revisit the well-studied D0-D4 system of D-branes and its relationship to the ADHM construction. It is well known that the D0-branes appear as instantons in the D4-brane worldvolume. We add a Wilson line to the D4-brane in the guise of an extended fundamental string and determine how this affects the D0-brane dynamics. As the D0-brane moves in the presence of the Wilson line, it experiences a Lorentz force, proportional to its Yang-Mills gauge connection. From the perspective of the D0-brane quantum mechanics, this force emerges through the ADHM construction of the self-dual gauge connection.

David Tong; Kenny Wong

2014-10-30T23:59:59.000Z

440

Optimising Shewhart charts in parallel production lines  

Science Journals Connector (OSTI)

I describe a methodology for optimising n Shewhart x-charts operating on parallel production lines in a factory. The goal is to maximise the factory-wide probability of detecting an out-of-control condition subject to a constraint on the expected number of false signals. I use non-linear programming to appropriately set the x-charts' control limits incorporating information about the probability of each production line going out-of-control. Using this approach, factories can set their quality control systems to optimally detect out-of-control conditions. Given some distributional assumptions, I also present a one-dimensional optimisation methodology that allows for the efficient optimisation of very large factories.

Ronald D. Fricker; Jr."> Jr.

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Giant vacuum forces via transmission lines  

E-Print Network [OSTI]

Quantum electromagnetic fluctuations induce forces between neutral particles, known as the van der Waals (vdW) and Casimir interactions. These fundamental forces, mediated by virtual photons from the vacuum, play an important role in basic physics and chemistry, and in emerging technologies involving, e.g. micro-electromechanical systems or quantum information processing. Here we show that these interactions can be enhanced by many orders of magnitude upon changing the character of the mediating vacuum-modes. By considering two polarizable particles in the vicinity of any standard electric transmission line, along which photons can propagate in one dimension (1d), we find a much stronger and longer-range interaction than in free-space. This enhancement may have profound implications on many-particle and bulk systems, and impact the quantum technologies mentioned above. The predicted giant vacuum force is estimated to be measurable in a coplanar waveguide line.

Ephraim Shahmoon; Igor Mazets; Gershon Kurizki

2013-04-07T23:59:59.000Z

442

Multi-transmission-line-beam interactive system  

E-Print Network [OSTI]

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube (TWT) due to J.R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides for: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Alexander Figotin; Guillermo Reyes

2013-04-19T23:59:59.000Z

443

1.Field intensity values in the original source documents were expressed in a range of upper and lower values (e.g.40 to 80 milligauss).For illustrative purposes,mid-point values were used in this chart.Actual values may be higher or lower.  

E-Print Network [OSTI]

to 5 mG Transmission Lines (115-500 kV) Distribution Lines (34.5 kV and under) 50 feet 100 to electric transmission and distribution lines.You will see that many common items are higher than LIPA that the magnetic fields at the edge of right-of-way for transmission lines would not exceed 150 mG.

Krstic, Miroslav

444

Marathon pipe line's new control system  

SciTech Connect (OSTI)

A new control system for Marathon Pipe Line Company's 4200 mile long oil pipeline is described. The pipeline transports 1 1/2 million barrels/day of crude oil and refined products. A comprehensive, centralized computer control system in Findlay, Ohio was developed to provide precision control of the system. Marathon is almost finished with the supervisory control and data acquisition system which can almost instantaneously control fluid movements throughout the network with the push of a few buttons.

Ross, J.

1983-03-01T23:59:59.000Z

445

Forms and Determinant Lines Simon Scott  

E-Print Network [OSTI]

has discrete spectrum {(n + )2 , (n - )2 : n N}, where u = e2i satisfies u2 (1 + |z|2 ) + 2u(z + z Forms and Determinant Lines Simon Scott 1 Introduction The purpose here is to give a direct (M) Hi-2 (Y ) is integration over the fibres. That is, with = c1(T) ch(Ind (m)) = f em · 1 - e

Bushnell, Colin J.

446

New Diagnostics in the FLASH Dump Line  

E-Print Network [OSTI]

Line Status Aug. 2009 BPM 9DUMP BPM 15DUMP BPM 5DUMP Toroid 9DUMP OTR screen 9DUMP BLM 14DUMP BLM 13 at the dump #12;N. Baboi, MDIN. Baboi, MDI FLASH Seminar, Dec. 1, 2009FLASH Seminar, Dec. 1, 2009 Old BPM 15DUMPOld BPM 15DUMP ·Strange behavior of BPM signals measured impedance from end of cable (in bld. 49): L

447

Transmission line environmental assessment guidance document  

SciTech Connect (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

448

ICE LINES IN CIRCUMBINARY PROTOPLANETARY DISKS  

SciTech Connect (OSTI)

I examine the position of the ice line in circumbinary disks heated by steady mass accretion and stellar irradiation and compare with the critical semimajor axis, interior to which planetary orbits are unstable. There is a critical binary separation, dependent on the binary parameters and disk properties, for which binaries with separations larger than this critical value have ice lines that lie interior to the boundary of stability. For an equal-mass binary comprised of 1 M{sub Sun} components, this critical separation is Almost-Equal-To 1.04 AU, and scales weakly with mass accretion rate and Rosseland mean opacity ({proportional_to}[ M-dot {kappa}{sub R}]{sup 2/9}). Assuming a steady mass accretion rate of M-dot {approx}10{sup -8} M{sub Sun} yr{sup -1} and a Rosseland mean opacity of {kappa}{sub R} {approx} 1 cm{sup 2} g{sup -1}, I show that {approx}> 80% of all binary systems with component masses M{sub *} {approx}< 2.0 M{sub Sun} have ice lines that lie interior to the critical semimajor axis. This suggests that rocky planets should not form in these systems, a prediction which can be tested by looking for planets around binaries with separations larger than the critical separation with Kepler (difficult) and with microlensing.

Clanton, Christian, E-mail: clanton@astronomy.ohio-state.edu [Department of Astronomy, Ohio State University, 140 W. 18th Ave., Columbus, OH 43210 (United States)

2013-05-01T23:59:59.000Z

449

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress. 16 figures.

Tuckerman, D.B.

1991-05-21T23:59:59.000Z

450

Stand-off transmission lines and method for making same  

DOE Patents [OSTI]

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress.

Tuckerman, David B. (Livermore, CA)

1991-01-01T23:59:59.000Z

451

PUMPING UP THE [N I] NEBULAR LINES  

SciTech Connect (OSTI)

The optical [N I] doublet near 5200 A is anomalously strong in a variety of emission-line objects. We compute a detailed photoionization model and use it to show that pumping by far-ultraviolet (FUV) stellar radiation previously posited as a general explanation applies to the Orion Nebula (M42) and its companion M43; but, it is unlikely to explain planetary nebulae and supernova remnants. Our models establish that the observed nearly constant equivalent width of [N I] with respect to the dust-scattered stellar continuum depends primarily on three factors: the FUV to visual-band flux ratio of the stellar population, the optical properties of the dust, and the line broadening where the pumping occurs. In contrast, the intensity ratio [N I]/H{beta} depends primarily on the FUV to extreme-ultraviolet ratio, which varies strongly with the spectral type of the exciting star. This is consistent with the observed difference of a factor of five between M42 and M43, which are excited by an O7 and B0.5 star, respectively. We derive a non-thermal broadening of order 5 km s{sup -1} for the [N I] pumping zone and show that the broadening mechanism must be different from the large-scale turbulent motions that have been suggested to explain the line widths in this H II region. A mechanism is required that operates at scales of a few astronomical units, which may be driven by thermal instabilities of neutral gas in the range 1000-3000 K. In an Appendix A, we describe how collisional and radiative processes are treated in the detailed model N I atom now included in the CLOUDY plasma code.

Ferland, G. J.; Porter, R. L. [Department of Physics, University of Kentucky, Lexington, KY 40506 (United States); Henney, W. J. [Centro de Radioastronomia y Astrofisica, UNAM Campus Morelia, Apartado Postal 3-72, 58090 Morelia, Michoacan (Mexico); O'Dell, C. R. [Department of Physics and Astronomy, Vanderbilt University, Box 1807-B, Nashville, TN 37235 (United States); Van Hoof, P. A. M. [Royal Observatory of Belgium, Ringlaan 3, 1180 Brussels (Belgium); Williams, R. J. R. [AWE plc, Aldermaston, Reading RG7 4PR (United Kingdom)

2012-09-20T23:59:59.000Z

452

Discontinuities in transmission lines and wave guides  

E-Print Network [OSTI]

IN THANSMISSION LINES AND ltrAVEGLIDES By Harold Fletcher Mathis A Thesis Submitted to the Graduate School of the Agricultural and Mechanical College of Texas in partial fulfillment of the requirements for the aegree of ELECTRICAL ENGIN~ May 1952 Major... s component to perform a pecific function and 1ts input impedance is not the proper v lue to give no discon- t1nuity, For example, an antenna which is to be fed by a 52-ohm coaxial cable is designed to give a desired red 1st ion pattern, but 1ts input...

Mathis, Harold Fletcher

2012-06-07T23:59:59.000Z

453

Speed-line for 3D animation  

E-Print Network [OSTI]

Committee Members, Carol LaFayette John Keyser Head of Department, Mardelle Shepley December 2005 Major Subject: Visualization Sciences iii ABSTRACT Speed-Line for 3D Animation. (December 2005) Won Chan Song, B.F.A., Ringling School of Art and Design Chair... to thank my committee members, Prof. Carol LaFayette and Dr. John Keyser for their advice and feedback. My gratitude also goes to Hobart Chan for letting me borrow his car model, which saved me a huge amount of time when I was making an animation as a...

Song, Won Chan

2007-04-25T23:59:59.000Z

454

Performance evaluation of mixed model assembly lines  

Science Journals Connector (OSTI)

Performance evaluation for a Mixed Model Assembly Line Balancing Problem is complicated as a multitude of factors affect operational objectives while the objectives themselves can not be represented easily. This paper reports a study of the effect of four factors namely number of workstations, number of models, demand pattern and stochastic variability of task times on performance measures used for representing the operational objectives. Analysis of Variance and Signal to Noise (S/N) ratio have been used to evaluate the ability of performance measures in representing the operational objectives and to identify the impact of the factors/interactions on the behaviour of performance measures.

Jonnalagedda V.L. Venkatesh; Balaji M. Dabade

2010-01-01T23:59:59.000Z

455

Transmission line including support means with barriers  

DOE Patents [OSTI]

A gas insulated transmission line includes an elongated outer sheath, a plurality of inner conductors disposed within and extending along the outer sheath, and an insulating gas which electrically insulates the inner conductors from the outer sheath. A support insulator insulatably supports the inner conductors within the outer sheath, with the support insulator comprising a main body portion including a plurality of legs extending to the outer sheath, and barrier portions which extend between the legs. The barrier portions have openings therein adjacent the main body portion through which the inner conductors extend.

Cookson, Alan H. (Pittsburgh, PA)

1982-01-01T23:59:59.000Z

456

Transmission line route selection by goal programming  

Science Journals Connector (OSTI)

A two-stage solution for transmission line route selection is presented. The generalized double-sweep method has been used to select the K least costly routes. The selected routes are subjected to social and environmental constraints (SEC). The SEC problem is formulated as a zero-one goal-programming model and solved by the implicit enumeration method. The two-stage solution algorithm has been applied to two problems. The results indicate the suitability of the method for route selection provided that acceptable SEC criteria can be found. The results also indicate the viability of the goal-programming technique for choosing power network interconnection concepts.

I.M. Elamin; S.O. Duffuaa; H.A. Yassein

1990-01-01T23:59:59.000Z

457

Comparing the performace of f1 testers versus their inbred line parents in evaluating experimental sorghum b and r lines in testcrosses.  

E-Print Network [OSTI]

??An appropriate tester correctly identifies the relative performance of experimental lines while maximizing the differences between lines. Most sorghum breeding programs use elite inbred lines… (more)

Packer, Daniel Jacob

2009-01-01T23:59:59.000Z

458

ENVIRONMENTAL REVIEW FOR CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Hesperus-Montrose (Project No.3) 345-kV Transmission Line and Curecanti-Lost Canyon 230-kV Transmission Line Routine Maintenance of Right-of-Way Roads La Plata, Montezuma, Dolores, San Miguel, and Montrose Counties, Colorado A. Brief Description of Proposal: Western Area Power Administration (Western) proposes to perform routine maintenance of existing access road and right-of-way (ROW) roads along the Hesperus- Montrose (HSP-MTR) 345-kilovolt (leV) Transmission Line located between Montrose and Norwood, Colorado. The project will provide safe access to transmission line structures 0 to 194 (approximately 110 miles). Also, Westem proposes to perform routine maintenance between structures 40/1 to 59/5 of the Curecanti-Lost Canyon (CCI-LCN) 230-kV Transmission Line. The

459

Control of stochasticity in magnetic field lines  

E-Print Network [OSTI]

We present a method of control which is able to create barriers to magnetic field line diffusion by a small modification of the magnetic perturbation. This method of control is based on a localized control of chaos in Hamiltonian systems. The aim is to modify the perturbation locally by a small control term which creates invariant tori acting as barriers to diffusion for Hamiltonian systems with two degrees of freedom. The location of the invariant torus is enforced in the vicinity of the chosen target. Given the importance of confinement in magnetic fusion devices, the method is applied to two examples with a loss of magnetic confinement. In the case of locked tearing modes, an invariant torus can be restored that aims at showing the current quench and therefore the generation of runaway electrons. In the second case, the method is applied to the control of stochastic boundaries allowing one to define a transport barrier within the stochastic boundary and therefore to monitor the volume of closed field lines.

Cristel Chandre; Michel Vittot; Guido Ciraolo; Philippe Ghendrih; Ricardo Lima

2005-04-14T23:59:59.000Z

460

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Quantification of Line Tracking Solutions for Automotive Applications  

Science Journals Connector (OSTI)

Unlike the line tracking for automotive paint applications where the speed match between the robot and the vehicle body plays critical role for the paint quality, the line tracking for automotive general assembly...

Jane Shi; Rick F. Rourke; Dave Groll…

2009-01-01T23:59:59.000Z

462

Nondestructive Testing of Overhead Transmission Lines: Numerical and Experimental Investigation  

E-Print Network [OSTI]

Overhead transmission lines are periodically inspected using both on-ground and helicopter-aided visual inspection. Factors including sun glare, cloud cover, close proximity to power lines and the rapidly changing visual circumstances make airborne...

Kulkarni, Salil Subhash

2011-02-22T23:59:59.000Z

463

National High Magnetic Field Laboratory - Drawing Field Lines...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A Portrait of Magnetism: Drawing Field Lines Try This At Home Magnets have two poles; the field lines spread out from the north pole and circle back around to the south pole. In...

464

Secretary Chu Thanks Utility Staff and Line Workers For Their...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

facts? Utility companies have deployed 64,000 linemen and utility staff to the front lines to repair downed power lines and bring electricity back online. As they finish up in...

465

The Pre-storm Environment of Midlatitude Prefrontal Squall Lines  

Science Journals Connector (OSTI)

Composite environmental profiles Of wind and temperature are presented for squall line cases that are spatially removed from frontal disturbances. The motions of the squall lines are inferred from radar data, and the mean environmental wind ...

Jonathan Wyss; Kerry A. Emanuel

1988-03-01T23:59:59.000Z

466

Increasing the Capacity of Existing Power Lines | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Increasing the Capacity of Existing Power Lines Increasing the Capacity of Existing Power Lines The capacity of the grid has been largely unchanged for decades and needs to expand...

467

Discrete Propagation in Numerically Simulated Nocturnal Squall Lines  

Science Journals Connector (OSTI)

Simulations of a typical midlatitude squall line were used to investigate a mechanism for discrete propagation, defined as convective initiation ahead of an existing squall line leading to a faster propagation speed for the storm complex. Radar ...

Robert G. Fovell; Gretchen L. Mullendore; Seung-Hee Kim

2006-12-01T23:59:59.000Z

468

A Theory for Strong, Long-Lived Squall Lines  

Science Journals Connector (OSTI)

We study herein the mechanics of long-lived, line-oriented, precipitating cumulus convection (squall lines) using two- and three-dimensional numerical models of moist convection. These models, used in juxtaposition, enable us to address the ...

Richard Rotunno; Joseph B. Klemp; Morris L. Weisman

1988-02-01T23:59:59.000Z

469

Updated Web Tool Focuses on Bottom Line for Distributed Wind...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Updated Web Tool Focuses on Bottom Line for Distributed Wind Turbines Updated Web Tool Focuses on Bottom Line for Distributed Wind Turbines January 10, 2013 - 2:43pm Addthis This...

470

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network [OSTI]

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

471

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4,...

472

EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho...  

Broader source: Energy.gov (indexed) [DOE]

7: Boardman-Hemingway Transmission Line, Oregon and Idaho EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho SUMMARY The Bureau of Land Management and the U.S. Forest...

473

Radio-Frequency Inverters With Transmission-Line Input Networks  

E-Print Network [OSTI]

A soft-switching inverter topology (the Class Phi ) is presented which draws dc source current through a transmission line or a lumped-network approximation of a distributed line. By aligning the inverter switching frequency ...

Phinney, Joshua W.

474

Construction of transmission lines above valuable standing timber  

Science Journals Connector (OSTI)

Problems with the construction of transmission lines above a forest are examined. Construction of lines above standing timber makes it possible to shorten the length of the route, eliminate the clearing of a cont...

L. O. Aizenberg; E. A. Khvoles

2007-11-01T23:59:59.000Z

475

On the Energy Efficiency of Mixed-Line-Rate Networks  

Science Journals Connector (OSTI)

We present an approach to evaluate energy efficiency of mixed-line-rate (MLR) optical networks. A comparative study of energy efficiency of MLR and single-line-rate (SLR) networks...

Chowdhury, Pulak; Tornatore, Massimo; Mukherjee, Biswanath

476

E-Print Network 3.0 - ac transmission lines Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lines Search Powered by Explorit Topic List Advanced Search Sample search results for: ac transmission lines...

477

E-Print Network 3.0 - astrocytoma cell lines Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lines Search Powered by Explorit Topic List Advanced Search Sample search results for: astrocytoma cell lines...

478

E-Print Network 3.0 - adenocarcinoma cell lines Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

lines Search Powered by Explorit Topic List Advanced Search Sample search results for: adenocarcinoma cell lines...

479

E-Print Network 3.0 - ac transmission line Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

line Search Powered by Explorit Topic List Advanced Search Sample search results for: ac transmission line...

480

On a two-loop crossed six-line master integral with two massive lines  

E-Print Network [OSTI]

We compute the two-loop crossed six-line vertex master integral with two massive lines in dimensional regularisation, and give the result up to the finite part in D-4. We focus in particular on the purely analytical calculation of the boundary condition which we derive from a three-fold Mellin-Barnes representation. We also describe how the computation of the boundary condition is used to derive three non-trivial relations among harmonic polylogarithms of the sixth root of unity.

T. Huber

2009-01-14T23:59:59.000Z

Note: This page contains sample records for the topic "line right-of-ways cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

North American Short Line and Regional Railroads Industry Report  

Broader source: Energy.gov (indexed) [DOE]

Short Line and American Short Line and Short Line and American Short Line and Regional Railroad Association Regional Railroad Association " " The Voice of America The Voice of America ' ' s Independent Railroads s Independent Railroads " " 4/27/2005 2 ASLRRA Membership ASLRRA Membership 0 100 200 300 400 500 600 700 800 Total Number of Member Companies 1943 1953 1963 1973 1983 1993 2003 Year ASLRRA Member History (1943 - 2003) Associate Railroad

482

Analysis ofNematic Liquid Crystals with Disclination Lines  

E-Print Network [OSTI]

with Disclination Lines. PATRICIA BAUMAN*, JINHAE PARKT & DANIEL PHILLIPs*. Abstract. We investigate the structure of nematic liquid crystal thin ?lms ...

483

Modelling boron-lined proportional counter response to neutrons  

Science Journals Connector (OSTI)

......of lithium. BF3 and boron-lined proportional...counters that employ 10B isotopes, the first in the gaseous...might be expected that boron-lined counters would...function of a typical boron-lined counter (2013...Koohi-Fayegh R. Determination of 4.43 MeV gamma-ray......

A. Shahri; N. Ghal-Eh; G. R. Etaati

2013-09-01T23:59:59.000Z

484

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements  

E-Print Network [OSTI]

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements Jiangmeng Zhang}@illinois.edu Abstract--This paper proposes a measurement-based method to assess transmission line loadability a stable operation. Transmission line loading limits are also essential to deter- mine locational marginal

Liberzon, Daniel

485

New approach for modelling distributed MEMS transmission lines  

E-Print Network [OSTI]

New approach for modelling distributed MEMS transmission lines K. Topalli, M. Unlu, S. Demir, O for the distributed MEMS transmission line (DMTL) structures. In this new model, the MEMS bridges that are used as the loading elements of the DMTL structures are represented as low-impedance transmission lines, rather than

Akin, Tayfun

486

Experimental characterisations of thin film transmission line losses  

E-Print Network [OSTI]

Experimental characterisations of thin film transmission line losses D. Kim, H. Kim and Y. Eo New frequency-variant losses of planar thin film transmission lines are experimentally investigated in a broad frequency range. The fre- quency-variant transmission line parameters are accurately determined

487

Exponential asymptotics and Stokes lines in nonlinear ordinary differential equations  

Science Journals Connector (OSTI)

...well-known Stokes line-smoothing phenomenon in linear...nonlinear equations|exponential asymptotics| Exponential...known Stokes line-smoothing phenomenon in linear...nonlinear equations; exponential asymptotics 1...well-known Stokes line-smoothing phenomenon in linear...the subdominant exponentials in the outer expansion...

1998-01-01T23:59:59.000Z

488

Ridgeview Publishing Company Indeterminism and the Thin Red Line  

E-Print Network [OSTI]

Ridgeview Publishing Company Indeterminism and the Thin Red Line Author(s): Nuel Belnap INDETERMINISM AND THE THIN RED LINE NuelBelnapandMitchellGreen Universityof Pittsburgh 1. Introduction 2,settledness,andactualityin branchingtime 5. The AssertionProblem 6. TheThinRedLine 7. Time's wingedchariothurriesnear 1. Introduction

Belnap, Nuel

489

Fuzzy Relative Positioning for On-Line Handwritten Stroke Analysis  

E-Print Network [OSTI]

Fuzzy Relative Positioning for On-Line Handwritten Stroke Analysis Franc¸ois Bouteruche, S and robust mod- elling of the relative positioning of on-line handwritten strokes. We exploit the fuzzy to deal with the particular nature of on-line strokes, which are consti- tuted of non-connected points

Paris-Sud XI, Université de

490

Molecular Lines as Diagnostics of Solar and Stellar Magnetic Fields  

E-Print Network [OSTI]

Molecular Lines as Diagnostics of Solar and Stellar Magnetic Fields S.V. Berdyugina1, S.K. Solanki2 of different OH lines are reproduced without invoking any free parameters, except the magnetic field strength to significant improvements in the deduced magnetic field vector. Here we investigate how molecular lines can

Berdyugina, Svetlana

491

Towards feature-driven planning of product-line evolution  

Science Journals Connector (OSTI)

Industries that successfully apply product line approaches often operate in markets that are well established and have a strategic perspective. Consequently, such organizations have a tendency towards long-term planning of products and product lines. ... Keywords: evolution, feature modeling, product line engineering

Goetz Botterweck; Andreas Pleuss; Andreas Polzer; Stefan Kowalewski

2009-10-01T23:59:59.000Z

492

Blend lines in the polarized spectrum of the Sun  

Science Journals Connector (OSTI)

......July 2012 research-article Papers Blend lines in the polarized spectrum of the Sun K...Astrophysics, Bangalore 560034, India Blend lines form an integral part of the theoretical...Their interaction with other spectral lines needs to be explored and understood before......

K. Sowmya; K. N. Nagendra; M. Sampoorna

2012-07-01T23:59:59.000Z

493

Stark parameter measurement of Ar II UV spectral lines  

Science Journals Connector (OSTI)

......parameter measurement of Ar-ii UV spectral lines S. Djurovic 1 M. T. Belmonte 2 R. J...of Stark parameters of Ar-ii spectral lines. We report 126 half-width and 111 shift...16-000 to 26-000-K. atomic data|line: profiles|plasmas| 1 INTRODUCTION Stark......

S. Djurovic; M. T. Belmonte; R. J. Peláez; J. A. Aparicio; S. Mar

2013-01-01T23:59:59.000Z

494

Trees and Power Lines: Minimizing Conflicts between Electric Power  

E-Print Network [OSTI]

Trees and Power Lines: Minimizing Conflicts between Electric Power Infrastructure and the Urban Forest By William Brock Most 1 and Steven Weissman 2 March 10, 2012 #12;iiTrees and Power Lines Trees and Power Lines 5 5. Benefits of the Urban Forest 6 a. Carbon Sequestration 6 b. Property Value 6

Kammen, Daniel M.

495

Experimental Stark widths and shifts of Cr II spectral lines  

Science Journals Connector (OSTI)

......Stark widths and shifts of Crii spectral lines J. A. Aguilera 1 C. Aragon 1 J. Manrique...Spain Stark widths and shifts of Crii lines with wavelengths in the range 2000-3500-a...to control the self-absorption of the lines. The Stark widths and shifts are compared......

J. A. Aguilera; C. Aragón; J. Manrique

2014-01-01T23:59:59.000Z

496

Computing Criticality of Lines in Power Systems Computational Research Div.  

E-Print Network [OSTI]

Computing Criticality of Lines in Power Systems Ali Pinar Computational Research Div. Lawrence critical lines, failure of which can cause severe blackouts. Our method computes criticality measure for all lines at a time, as opposed to detecting a single vulnerability, providing a global view

Geddes, Cameron Guy Robinson

497

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits  

E-Print Network [OSTI]

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits Mohammad D. Al to transmission line circuit problems based on the longitudinal partitioning into segments. This greatly improves the convergence for strongly coupled RLCG transmission line (TL) type circuits. The method can be applied to other

Gander, Martin J.

498

Using Transmission Lines for Global On-Chip Communication  

E-Print Network [OSTI]

1 Using Transmission Lines for Global On-Chip Communication Aaron Carpenter, Jianyun Hu, Jie Xu-switched network-on-chip a less attractive option. An alternative solution uses well-engineered transmission lines as communication links. These transmission lines, along with simple, practical circuits using modern CMOS technol

Huang, Michael C.

499

Transmission Line Boundary Protection Using Wavelet Transform and Neural Network  

E-Print Network [OSTI]

1 Transmission Line Boundary Protection Using Wavelet Transform and Neural Network Nan Zhang of transmission line protection are: a) differentiating precisely the internal faults from external, and b is verified using frequency-dependent transmission line model and the test results prove its enhanced

500

EXTENSION OF THE TRANSMISSION LINE THEORY APPLICATION WITH MODIFIED  

E-Print Network [OSTI]

1 EXTENSION OF THE TRANSMISSION LINE THEORY APPLICATION WITH MODIFIED ENHANCED PER introduces a modified enhanced transmission-line theory to account for higher-order modes while using a standard transmission line equation solver or equivalently a Baum, Liu and Tesche (BLT) equation solver

Paris-Sud XI, Université de