EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade...

2

Gila to North Gila Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Western proposes to rebuild and upgrade two, parallel, 4.8-mile-long transmission lines located between Gila and North Gila Substations and take land actions...

3

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 34-mile Midway-Moxee transmission line in Benton and Yakima Counties, Washington.

4

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

NLE Websites -- All DOE Office Websites (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

5

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

6

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

7

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

8

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion,...

9

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

10

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

11

Switchyards Rebuild and Upgrade Project in Mohave County, Arizona  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . Categorical Exclusion for the Demolition of a Service Building at Davis Dam Lower 230-kV Switchyard as part of the Overall Switchyards Rebuild and Upgrade Project in Mohave County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western Area Power Administration (Western) plans to demolish a service building located in the Lower 230-kV Switchyard at Davis Dam, because it no longer meets our needs and we do not anticipate finding a use for it in the future. The building is currently vacant and has been for years. We plan to begin the work on April 1 ,2011 and complete it by December 31,2011. The attached map shows the project area location. Aerial photographs show that much of this area is developed. Western owns the land. The legal description is

12

DOE/EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEEA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon DOEEA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary...

13

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

14

Libby-Troy Line Rebuild Project - July 25, 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

15

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville...

16

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...

17

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties,...

18

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Executive Summary Grand County, Colorado June 2013 Granby Pumping Plant-Windy Gap Substation Transmission Line Rebuild Project FEIS Executive Summary ES-1 EXECUTIVE SUMMARY Introduction Western Area Power Administration (Western), a power marketing administration within the U.S. Department of Energy (DOE), is proposing to rebuild and upgrade the Granby Pumping Plant Switchyard-Windy Gap Substation transmission line in Grand County, Colorado (Grand County). This Environmental Impact Statement (EIS) analyzes the impacts associated with the proposal to remove approximately 13.6 miles of 69-kilovolt (kV) transmission line, construct approximately

19

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO  

Energy.gov (U.S. Department of Energy (DOE))

DOE’s Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support its decision on whether to grant a Special Use Permit for parts of the transmission line located on National Forest lands.

20

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln  

NLE Websites -- All DOE Office Websites (Extended Search)

50: Grand Coulee-Creston Transmission Line Rebuild; Grant and 50: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington SUMMARY Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of approximately 28 miles of transmission line between the cities of Coulee Dam in Grant County and Creston in Lincoln County, Washington. The proposed project would include replacing all wood pole structures and conductor, improving existing access roads, and developing temporary access roads. Additional information is available at the project website: http://www.bpa.gov/goto/CouleeCrestonRebuild. PUBLIC COMMENT OPPORTUNITIES Draft EA: Comment Period Ends 2/3/14.

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

22

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

23

EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17: Lovell-Yellowtail and Basin-Lovell Transmission Line 17: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana Summary DOE's Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

24

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

25

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Appendices  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Appendices Grand County, Colorado June 2013 Appendix A EIS Scoping Report GRANBY PUMPING PLANT - WINDY GAP TRANSMISSION LINE REBUILD PROJECT ENVIRONMENTAL IMPACT STATEMENT SCOPING SUMMARY REPORT December 4, 2007

26

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 23.90-mile Salem-Albany No. 1 and 27.85-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

27

DOE/EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

28

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

29

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

30

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

31

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

32

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

33

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona

34

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge...

35

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY:...

36

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

37

Request for Proposals for New or Upgraded Transmission Line Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012...

38

EA-1931: Keeler-Forest Grove, Forest Grove-Tillamook Line No. 1 Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA will evaluate the potential environmental impacts of a BPA proposal to rebuild its 58 mile long, 115 kilovolt (kV) wood pole Keeler-Forest Grove and Forest Grove-Tillamook transmission lines. The deteriorated transmission line structures (wood pole structures, switches, cross arms, braces, guys, anchors, insulator assemblies and conductor) need to be replaced in order to maintain reliable electrical service, avoid risks to the public, and ensure worker safety.

39

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

40

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

MCP Upgrade: Transmission Line and Pore Importance  

E-Print Network (OSTI)

In order to take advantage of all of the benefits of Multi-Channel Plate Photo-Multiplier Tubes (MCPs) a fast and efficient readout scheme must be implemented. One scheme that appears very promising is that of a transmission line coupled to a digital sampling readout. Transmission line readout allows for 2D position reconstruction, as well as an extremely fast response time, allowing for an exceptional timing resolution. I will be discussing the development of a method to connect the transmission line readout to the anode of the MCP, as well as testing the resultant MCP-transmission line readout system. This testing occurred at Argonnes laser lab, which featured a tunable fast rise time laser as well as a data acquisition system with a low noise level. A study to determine the importance of the pore size of the MCP was also carried out at Argonnes laser lab. In this study two MCPs which differed only in pore size (25µm and 10µm) were tested and their timing resolutions were compared. The objective of the following discussion is to quantify the effectiveness of the transmission line readout, learn more about the nature of the MCP and its signals, and look for ways in which to improve upon the present readout technique. 2 Tyler Natoli 1

Tyler Natoli; Advisor Henry Frisch

2009-01-01T23:59:59.000Z

42

A Guide for Transmission Line Voltage Upgrade  

Science Conference Proceedings (OSTI)

In the last few decades, construction of new transmission facilities has not caught up with the demand for electric power. The problem of transmission capacity shortage was further compounded by deregulation of the power industry, which allows power to be dispatched from any generation source for the lowest energy cost. As a result, lines that were not planned for these power flows may now be overloaded. A number of bottlenecks were thus created, restricting power transfer from one location to another. U...

2008-12-09T23:59:59.000Z

43

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

44

Plains & Eastern Clean Line Project Proposal for New or Upgraded  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) Update to Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (August 2011) More Documents & Publications EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland Involvement Notice of Intent To Prepare an Environmental Impact Statement for the

45

MICRON SIZE LASER-WIRE SYSTEM AT THE ATF EXTRACTION LINE, RECENT RESULTS AND ATF-II UPGRADE  

E-Print Network (OSTI)

The KEK Accelerator test facility (ATF) extraction line laser-wire system has been upgraded last year allowing the measurement of micron scale transverse size electron beams. The most recent measurements using the upgraded system are presented. The ATF-II extraction line design call for the major upgrade of the existing laser-wire system. We report on the hardware upgrades, including the major hardware upgrades to the laser transport, the laser beam diagnostics line, and the mechanical control systems.

Blair, G A; Boorman, G; Bosco, A; Deacon, L; Karataev, P; Howell, D; Nevay, L J; Corner, L; Delerue, N; Foster, B; Gannaway, F; Newman, M; Senanayake, R; Walczak, R; Hayano, H; Aryshev, A; Terunuma, N; Urakawa, J

2009-01-01T23:59:59.000Z

46

DOE/EA-1508: Environmental Assessment for the Beaver Creek-Hoyt-Erie Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BC-HT-EE Mitigation Action Plan Nov. 2005 1 BC-HT-EE Mitigation Action Plan Nov. 2005 1 Mitigation Action Plan To Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 BC-HT-EE Mitigation Action Plan Nov. 2005 2 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Construction Contractor Western Maintenance The contractor shall limit the movement of crews and equipment to the ROW, including access routes. The contractor shall limit movement on the ROW to minimize damage to residential yards, grazing land, crops, orchards, and property, and shall avoid marring the lands.

47

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

48

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration`s (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower`s Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

49

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

50

Microsoft Word - CX-BettasRd-ColumbiaThermalUpgradeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2012 25, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Bettas Road-Columbia No. 1 230-kV transmission line thermal upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and rebuilding existing powerlines Location: Kittitas and Chelan counties, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is to upgrade the existing Bettas Road-Columbia No. 1 230-kV transmission line to a maximum operating temperature of 100 °C. Five small segments (equal to approximately 3 miles) along the transmission line will be upgraded in order to meet this overall objective. Construction includes the relocation and

51

EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR 57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR Summary This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Public Comment Opportunities None available at this time. Documents Available for Download June 13, 2012 EIS-0457: Mitigation Action Plan Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Notice of Availability of a Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR

52

Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient Communities Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient Communities October 29, 2013 - 10:21am Addthis Workers repair power lines in the Mid-Atlantic shortly after Hurricane Sandy. | Photo courtesy of the Energy Department. Workers repair power lines in the Mid-Atlantic shortly after Hurricane Sandy. | Photo courtesy of the Energy Department. Dr. Ernest Moniz Dr. Ernest Moniz Secretary of Energy What are the key facts? This week marks the one-year anniversary of Hurricane Sandy making landfall in New Jersey. The federal government has been committed to the recovery and rebuilding efforts since day one, but much work remains. The Energy Department is taking actions to protect our energy

53

Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandy One Year Later: Rebuilding Stronger, More Resilient Sandy One Year Later: Rebuilding Stronger, More Resilient Communities Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient Communities October 29, 2013 - 10:21am Addthis Workers repair power lines in the Mid-Atlantic shortly after Hurricane Sandy. | Photo courtesy of the Energy Department. Workers repair power lines in the Mid-Atlantic shortly after Hurricane Sandy. | Photo courtesy of the Energy Department. Dr. Ernest Moniz Dr. Ernest Moniz Secretary of Energy What are the key facts? This week marks the one-year anniversary of Hurricane Sandy making landfall in New Jersey. The federal government has been committed to the recovery and rebuilding efforts since day one, but much work remains. The Energy Department is taking actions to protect our energy

54

Microsoft Word - CX-Big Eddy-TroutdaleUpgradeFY12_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Erich Orth Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Big Eddy - Troutdale No. 1 230 kV Transmission Line Upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and Rebuilding Existing Powerlines. Location: Wasco, Hood River and Clackamas counties, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is the thermal upgrade of the BPA Big Eddy - Troutdale No.1 230 kV Transmission Line: Background BPA's Big Eddy - Troutdale No. 1 230-kV transmission line is one of three major transmission lines that cross the Oregon Cascade Mountains. These lines transport The Dalles hydro generation and northwest wind generation output in the east to load centers west of the Cascades, like

55

Overview of the Rebuild America Program in Texas  

E-Print Network (OSTI)

The Rebuild America program is a multi-year program, through the U.S. Department of Energy (USDOE), that will increase investment in energy efficiency. As the program progresses, it will save energy, create jobs, and improve the environment. The Brazos Valley Energy Conservation Coalition (BVECC), administered by the Energy Systems Laboratory (ESL) of Texas A&M University, in College Station, Texas received notification of the US. Department of Energy (USDOE)-Rebuild America award in June, 1996. In the first year of this partnership, the BVECC has developed three Rebuild America related projects in Texas totaling more than $3 million in construction costs. The energy conservation retrofits in the three projects include a lighting upgrade, HVAC systems modifications, and an EMCS upgrade/installation. These projects have been financed through internal facility funding or through third party financing institutes. The average payback period of the retrofit projects is eight years. This paper presents an overview of the BVECC Rebuild America program in Texas. It also describes the energy conservation projects in three facilities in Texas where energy conservation retrofits are being implemented.

Saman, N.; Haberl, J. S.; Turner, W. D.

1998-01-01T23:59:59.000Z

56

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

57

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

58

Design and Analyses of Transmission Lines for the 110 GHzECH Upgrade to 6 MW for DIII-D  

SciTech Connect

During the summer of 1999 the installation of three new Electron Cyclotron Heating (ECH) transmission lines began as part of the 110 GHz ECH Upgrade to 6 MW project for DIII-D. An important step in the development of the transmission line design was the selection of the waveguide size. To make this selection, analyses were conducted to characterize the thermal and radio frequency (rf) loss performance of the key corrugated waveguide components under 1 MW, long pulse (10 s, 1% duty cycle) operation. Other factors that were analyzed included vacuum conductance and pumping speed, ease of installation, space considerations, and overall cost. The two candidate transmission line sizes were 2.50 in. and 1.25 in. id. An overview of the design and layout of the proposed transmission lines for the DIII-D ECH upgrade project is presented. Details and results are given for the vacuum conductance analysis of the overall transmission line, the rf loss analyses and tests on corrugated waveguide and miter bends, and the thermal analyses of the mirrors in the corrugated waveguide switch and the power monitor miter bend. Finally, a discussion is presented which weighs the results of these analyses with the experience gained through the installation and operation of the existing three 1 MW ECH systems at DIII-D and concludes with the selection of 1.25 in. i.d. waveguide and components for the upgrade project.

Grunloh, H.J.; Baxi, C.B.; Chin, E.; Condon, M.; Doane, J.L.; Moeller, C.P.; O'Neill, R.C.

1999-11-01T23:59:59.000Z

59

Microsoft Word - Lower-MidColumbia-Upgrade-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Steve Prickett Project Manager - TEP Proposed Action: Lower Mid-Columbia / Midway-Vantage 230-kV Transmission Line Upgrade Project Budget Information: Work Order #238901 and #231311, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility..." B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. B4.13 "Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines

60

EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Midway-Benton No. 1 Rebuild Project, near town of Desert Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA This EA evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild its existing Midway-Benton No.1 transmission line in place, or to reroute a portion of the Midway-Benton No. 1 transmission line that currently crosses Gable Mountain and Gable Butte in order to avoid crossing these features. Please note: Together, the Draft EA and the Revision to the Draft EA constitute the Final EA. EA-1912-DEA-2012.pdf EA-1912-RevisedDEA-2012.pdf More Documents & Publications EA-1912: Draft Environmental Assessment

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1912: Midway-Benton No. 1 Rebuild Project, near town of Desert 1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA Summary This EA evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild its existing Midway-Benton No.1 transmission line in place, or to reroute a portion of the Midway-Benton No. 1 transmission line that currently crosses Gable Mountain and Gable Butte in order to avoid crossing these features. For more information, please see: http://efw.bpa.gov/environmental_services/Document_Library/MidwayBentonRebuild/ Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2012 EA-1912: Finding of No Significant Impact

62

Grant Helps Efficiently Rebuild Ohio Infrastructure | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grant Helps Efficiently Rebuild Ohio Infrastructure Grant Helps Efficiently Rebuild Ohio Infrastructure February 22, 2010 - 11:12am Addthis Joshua DeLung What are the key facts?...

63

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana Summary This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy

64

EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

855: Creston-Bell Rebuild Project, Spokane and Lincoln 855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA Summary This EA (also known as DOE/EA-4406 or DOE/BP-4406) evaluates the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington. Additional information about this project is available on the BPA website. Public Comment Opportunities None available at this time. Documents Available for Download

65

Power upgrading of transmission line by combining AC-DC transmission  

Science Conference Proceedings (OSTI)

Long extra high voltage (EHV) ac lines cannot be loaded to their thermal limits in order to keep sufficient margin against transient instability. With the scheme proposed in this project, it is possible to load these lines very close to their thermal ... Keywords: extra high voltage (EHV)transmission, flexible ac transmission system (FACTS), power system computer-aided design(PSCAD), simultaneous ac-dc power transmission

Jarupula Somlal

2010-07-01T23:59:59.000Z

66

Rebuilding It Better: City of Greensburg, Kansas, Business Incubator...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47189.pdf More Documents & Publications Rebuilding It Better: City of Greensburg, Kansas, Business Incubator (Brochure) A Tale of Two Cities: Greensburg Rebuilds as a National...

67

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

68

Re-Building Greensburg | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Re-Building Greensburg Re-Building Greensburg Re-Building Greensburg Addthis Description Greensburg, KS - A town that was devastated by a tornado in 2007, yet came back to be one of the Nation's most energy-efficient, sustainable communities. Civic leaders and entrepreneurs helped rally residents behind the idea of "greening" Greensburg, inspiring the construction of numerous energy-efficient buildings, some of which generate their own renewable power with solar panels and wind turbines. Speakers Steve Hewitt, Daniel Wallach, Stephanie Peterson, Stacy Barnes Duration 4:09 Topic Energy Sources Consumption Energy Economy Emergency Response & Procedures Credit Energy Department Video STEVE HEWITT: In 2007 we had this massive tornado that came through Greensburg. STACY BARNES: Words can't even begin to describe what it was like to

69

Rebuilding It Better: Greensburg, Kansas, High Performance Buildings...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE) Rebuilding It Better: Greensburg,...

70

Rebuilding It Better: Greensburg, Kansas, High Performance Buildings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, High Performance Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE) Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE) This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. 53539.pdf More Documents & Publications From Tragedy to Triumph: Rebuilding Greensburg, Kansas To Be a 100% Renewable Energy City: Preprint Rebuilding It Better; BTI-Greensburg, John Deere Dealership (Brochure) (Revised) Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;

71

From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From Tragedy to Triumph - Rebuilding Green Buildings after From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) Fact sheet offering practical information about building energy efficient buildings and using renewable energy. Includes a checklist and resources. Highlights successful projects in Greensburg, Kansas. 45139.pdf More Documents & Publications Rebuilding It Better: Greensburg, Kansas. USD 422 Greensburg K-12 School (Revised) (Brochure), Energy Efficiency & Renewable Energy (EERE) Rebuilding It Better: Greensburg, Kansas. USD 422 Greensburg K-12 School (Revised) (Brochure), Energy Efficiency & Renewable Energy (EERE) Greensburg, Kansas: A Better, Greener Place to Live (Revised) (Brochure)

72

line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

along the existing along the existing Empire-EDS 11S-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Empire-ED5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system.

73

From Tragedy to Triumph - Rebuilding Green Homes after Disaster (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From Tragedy to Triumph - Rebuilding Green Homes after Disaster From Tragedy to Triumph - Rebuilding Green Homes after Disaster (Revised) (Fact Sheet) From Tragedy to Triumph - Rebuilding Green Homes after Disaster (Revised) (Fact Sheet) These Greensburg fact sheet sheets help citizens understand what they can do as a part of the focus. Saving energy & water, using renewable energy (particular interest in small wind), driving "green", general sustainability, & living green. 45138.pdf More Documents & Publications From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 From Tragedy to Triumph - Rebuilding with Renewable Energy after Disaster,

74

Rebuilding it Better: Greensburg, Kansas, Kiowa County Memorial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

it Better: Greensburg, Kansas, Kiowa County Memorial Hospital (Brochure) (Revised) Rebuilding it Better: Greensburg, Kansas, Kiowa County Memorial Hospital (Brochure) (Revised)...

75

From Tragedy to Triumph - Rebuilding Green Buildings after Disaster...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Buildings after Disaster, EERE (Fact Sheet) From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) Fact sheet offering practical information...

76

Rebuilding for Sustainability: Case Studies in the Making (Presentatio...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy, operated by the Alliance for Sustainable Energy, LLC. Rebuilding for Sustainability: Case Studies in the Making SOLAR 2013 Lynn Billman, Senior Project Lead April 18,...

77

From Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be...  

Open Energy Info (EERE)

Availability Publicly available--Free Publication Date 8152010 Website http:apps1.eere.energy.govb Locality Greensburg, Kansas References From Tragedy to Triumph: Rebuilding...

78

Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

those communities today, it is valuable to assess the lessons learned from this natural disaster so that we can rebuild stronger, more resilient communities that are better...

79

Rebuild America Partner Update, January--February 1999  

SciTech Connect

Rebuild America Partner Update, the bimonthly newsletter about the Rebuild America community, covers partnership activities, industry trends, and program news. Rebuild America is a network of community partnerships--made up of local governments and businesses--that save money by saving energy. These voluntary partnerships, working with the US Department of Energy, choose the best ways to improve the energy efficiency of commercial, government and apartment buildings. Rebuild America supports them with business and technical tools and customized assistance. By the year 2003, 250 Rebuild America partnerships will be involved in over 2 billion square feet of building renovations, which will save $650 million every year in energy costs, generate $3 billion in private community investment, create 26,000 new private sector jobs, and reduce air pollution by 1.6 million tons of carbon dioxide a year.

1999-01-01T23:59:59.000Z

80

Rebuilding After Disaster: Going Green from the Ground Up (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuilding After Disaster: Going Green from the Ground Up (Revised) Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) 20-page "how-to" guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster. 45136.pdf More Documents & Publications Greensburg Webinars Q&A From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

82

Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital |  

Open Energy Info (EERE)

Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital Jump to: navigation, search Name Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital Agency/Company /Organization National Renewable Energy Laboratory Focus Area Agriculture, Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals Resource Type Case studies/examples Availability Publicly available--Free Publication Date 8/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects

83

Kansas Business Rebuilds Greener After Destruction | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Rebuilds Greener After Destruction Business Rebuilds Greener After Destruction Kansas Business Rebuilds Greener After Destruction January 7, 2010 - 2:37pm Addthis Joshua DeLung What are the key facts? After 95 percent of Greensburg, Kan., was leveled by a tornado, a major dealership employing 1,500 Kansans rebuilds to achieve energy savings of nearly 50 percent over similar structures built to code. Ninety-five percent of Greensburg, Kan., was leveled by a tornado with 250-mile-per-hour winds in May 2007. One of the many businesses destroyed that spring was the Bucklin Tractor & Implement-Greensburg John Deere dealership, a component of the agricultural community that about 1,500 Kansans call home. The dealership owners, brothers Kelly and Mike Estes, knew the rebirth of their community depended greatly on access to farm equipment and services,

84

Rebuilding the American Auto Industry | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuilding the American Auto Industry Rebuilding the American Auto Industry Rebuilding the American Auto Industry December 8, 2011 - 3:40pm Addthis Rebuilding the American Auto Industry Dan Leistikow Dan Leistikow Former Director, Office of Public Affairs Three years ago, critics said that America's auto industry could not or should not be saved, and that our country should simply accept defeat and watch the industry collapse. The Administration refused to accept this proposition, and made strategic investments to help U.S. auto manufacturers weather the storm and retool to produce the hybrid, electric, and highly fuel efficient advanced vehicles of the future. With the help of these investments -- and the incredible talent and commitment of America's auto workers -- the auto industry is growing again.

85

Rebuilding It Better: Greensburg, Kansas, Business Incubator | Open Energy  

Open Energy Info (EERE)

Rebuilding It Better: Greensburg, Kansas, Business Incubator Rebuilding It Better: Greensburg, Kansas, Business Incubator Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Ground Source Heat Pumps, Solar, - Solar Pv, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals, Develop Finance and Implement Projects Resource Type Case studies/examples Availability Publicly available--Free Publication Date 4/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, Business Incubator [1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References Overview The city of Greensburg, Kansas, is rebuilding as a model green community

86

Working Together to Recover and Rebuild After Hurricane Sandy | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Working Together to Recover and Rebuild After Hurricane Sandy Working Together to Recover and Rebuild After Hurricane Sandy Working Together to Recover and Rebuild After Hurricane Sandy November 5, 2012 - 6:30pm Addthis Supervising Engineer for Public Service Electric and Gas Company, Michael Vincent, right, Department of Energy Secretary Steven Chu, center, and FEMA Deputy Administrator Rich Serino review power restoration at the Hoboken electrical substation. Restoration of power to communities impacted by Hurricane Sandy remains a high priority. | Photo by Jocelyn Augustino/FEMA. Supervising Engineer for Public Service Electric and Gas Company, Michael Vincent, right, Department of Energy Secretary Steven Chu, center, and FEMA Deputy Administrator Rich Serino review power restoration at the Hoboken electrical substation. Restoration of power to communities impacted by

87

Reducing Energy Costs and Rebuilding the Past | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reducing Energy Costs and Rebuilding the Past Reducing Energy Costs and Rebuilding the Past Reducing Energy Costs and Rebuilding the Past June 7, 2012 - 2:48pm Addthis Franklin County Courthouse (Before) 1 of 2 Franklin County Courthouse (Before) A court employee and news photographer survey the bomb damage in the Franklin County Courthouse's main courtroom in November 1969. Image: Courtesy of the Washington Missourian. Franklin County Courthouse (After) 2 of 2 Franklin County Courthouse (After) The fully restored main courtroom includes the original 1930s paint colors and reproduction lighting. Image: Sallie Glaize Franklin County, MO Chris Galm Marketing & Communications Specialist, Office of Energy Efficiency & Renewable Energy People across the country are looking for ways to make homes and buildings

88

Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy-Efficient Rebuilding After Tragedy: Inspiration from Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg, Kansas Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg, Kansas May 10, 2011 - 3:29pm Addthis Allison Casey Senior Communicator, NREL We discuss the weather a lot here on the Energy Savers Blog. It comes with the territory; seasonal temperature changes influence how we use energy in our homes. We also know that extreme weather can have big consequences; from health to finances to simple comfort, the weather has a huge effect on our daily lives. But one thing we don't discuss here very often is when weather turns tragic. Some areas of the country have seen a lot of terrible weather in recent weeks, with devastating tornadoes and now flooding hitting many states hard. Many people have lost friends and loved ones, and even more

89

How Would You Rebuild a Town - Green? | Open Energy Information  

Open Energy Info (EERE)

Would You Rebuild a Town - Green? Would You Rebuild a Town - Green? Jump to: navigation, search Name How Would You Rebuild a Town - Green? Agency/Company /Organization U.S. Department of Energy Partner Greensburg GreenTown, National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Goods and Materials - Materials, Energy Efficiency, People and Policy, Transportation, Biomass - Anaerobic Digestion, Biomass - Biofuels, Water Power, Solar, - Solar Pv, Wind Phase Bring the Right People Together, Create a Vision, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes Resource Type Case studies/examples Availability Publicly available--Free Publication Date 4/1/2009 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas

90

Rebuilding It Better: Greensburg, Kansas. Kiowa County Courthouse (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REBUILDING IT BETTER: GREENSBURG, KANSAS REBUILDING IT BETTER: GREENSBURG, KANSAS On May 4, 2007, a massive tornado destroyed or severely damaged 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable rural community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are working with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. Ultimately, these technologies could be replicated in other communities recovering from disaster. Kiowa County Courthouse Originally built in 1914, Kiowa County Courthouse is one of the few buildings that survived the force of the Greensburg tornado: 205-mile-per-hour winds that left a

91

Rebuilding After Disaster: Going Green from the Ground Up (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

After Disaster: Going Green from the Ground Up (Revised) After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) 20-page "how-to" guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster. 45136.pdf More Documents & Publications From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE

92

Rebuilding It Better: Greensburg, Kansas, Kiowa County Courthouse | Open  

Open Energy Info (EERE)

Courthouse Courthouse Jump to: navigation, search Name Rebuilding It Better: Greensburg, Kansas, Kiowa County Courthouse Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Ground Source Heat Pumps, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals Resource Type Case studies/examples Availability Publicly available--Free Publication Date 4/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, Kiowa County Courthouse[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References Overview The city of Greensburg, Kansas, is rebuilding as a model green community

93

Working Together to Recover and Rebuild After Hurricane Sandy | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Working Together to Recover and Rebuild After Hurricane Sandy Working Together to Recover and Rebuild After Hurricane Sandy Working Together to Recover and Rebuild After Hurricane Sandy November 5, 2012 - 6:30pm Addthis Supervising Engineer for Public Service Electric and Gas Company, Michael Vincent, right, Department of Energy Secretary Steven Chu, center, and FEMA Deputy Administrator Rich Serino review power restoration at the Hoboken electrical substation. Restoration of power to communities impacted by Hurricane Sandy remains a high priority. | Photo by Jocelyn Augustino/FEMA. Supervising Engineer for Public Service Electric and Gas Company, Michael Vincent, right, Department of Energy Secretary Steven Chu, center, and FEMA Deputy Administrator Rich Serino review power restoration at the Hoboken electrical substation. Restoration of power to communities impacted by

94

Reducing Energy Costs and Rebuilding the Past | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reducing Energy Costs and Rebuilding the Past Reducing Energy Costs and Rebuilding the Past Reducing Energy Costs and Rebuilding the Past June 7, 2012 - 2:48pm Addthis Franklin County Courthouse (Before) 1 of 2 Franklin County Courthouse (Before) A court employee and news photographer survey the bomb damage in the Franklin County Courthouse's main courtroom in November 1969. Image: Courtesy of the Washington Missourian. Franklin County Courthouse (After) 2 of 2 Franklin County Courthouse (After) The fully restored main courtroom includes the original 1930s paint colors and reproduction lighting. Image: Sallie Glaize Franklin County, MO Chris Galm Marketing & Communications Specialist, Office of Energy Efficiency & Renewable Energy People across the country are looking for ways to make homes and buildings

95

Rebuilding It Better: Greensburg, Kansas, K-12 School | Open Energy  

Open Energy Info (EERE)

It Better: Greensburg, Kansas, K-12 School It Better: Greensburg, Kansas, K-12 School Jump to: navigation, search Name Rebuilding It Better: Greensburg, Kansas, K-12 School Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Ground Source Heat Pumps, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals Resource Type Case studies/examples Availability Publicly available--Free Publication Date 9/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, K-12 School[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References Overview The city of Greensburg, Kansas, is rebuilding as a model green community

96

Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy-Efficient Rebuilding After Tragedy: Inspiration from Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg, Kansas Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg, Kansas May 10, 2011 - 3:29pm Addthis Allison Casey Senior Communicator, NREL We discuss the weather a lot here on the Energy Savers Blog. It comes with the territory; seasonal temperature changes influence how we use energy in our homes. We also know that extreme weather can have big consequences; from health to finances to simple comfort, the weather has a huge effect on our daily lives. But one thing we don't discuss here very often is when weather turns tragic. Some areas of the country have seen a lot of terrible weather in recent weeks, with devastating tornadoes and now flooding hitting many states hard. Many people have lost friends and loved ones, and even more

97

Rebuilding It Better: Greensburg, Kansas. Kiowa County Courthouse (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REBUILDING IT BETTER: GREENSBURG, KANSAS REBUILDING IT BETTER: GREENSBURG, KANSAS On May 4, 2007, a massive tornado destroyed or severely damaged 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable rural community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are working with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. Ultimately, these technologies could be replicated in other communities recovering from disaster. Kiowa County Courthouse Originally built in 1914, Kiowa County Courthouse is one of the few buildings that survived the force of the Greensburg tornado: 205-mile-per-hour winds that left a

98

U.S. Energy Secretary Steven Chu to Help Rebuild Homes in New...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steven Chu to Help Rebuild Homes in New Orleans on Veterans Day U.S. Energy Secretary Steven Chu to Help Rebuild Homes in New Orleans on Veterans Day November 9, 2010 - 12:00am...

99

Rebuilding It Better: Greensburg, Kansas, City Hall | Open Energy  

Open Energy Info (EERE)

Hall Hall Jump to: navigation, search Name Rebuilding It Better: Greensburg, Kansas, City Hall Agency/Company /Organization National Renewable Energy Laboratory Focus Area Agriculture, Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Ground Source Heat Pumps, - Solar Pv, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals, Develop Finance and Implement Projects, Create Early Successes Resource Type Case studies/examples Availability Publicly available--Free Publication Date 9/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, City Hall [1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References

100

Recharge Elec. Upgrade Type  

E-Print Network (OSTI)

battery can be plugged in to an electric outlet to be recharged. Background: PHEVs 1. How many U" cost) · Variety of upgrade packages selected--some with zero upgrades · Most popular upgrade" Price Scenario ("home recharges" only) · "Base" PHEV=$3,000 premium · Added costs for upgrades (Full

California at Davis, University of

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Fish Stocks in Rebuilding Plans: A Trend Analysis Introduction  

E-Print Network (OSTI)

into four categories based on the level of fishing mortality (F) and how biomass (B) is responding: 1) The most recent year's estimate of F is above the overfishing level (subject to overfishing; 3) The biomass has increased since the rebuilding plan was implemented; and 4) The biomass has decreased

102

Microsoft Word - CX-NorthBonneville-RossNorthBonneville-Troutdale_LineSwap_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Civil Engineer - TEP-TPP-3 Proposed Action: North Bonneville-Ross #1 230-kV, North Bonneville-Troutdale #2 230-kV transmission line maintenance Budget Information: Work Order #00246927 PP&A Project No.: PP&A 1666 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.13 Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines approximately 20 miles in length or less to enhance environmental and land use values. Such actions include relocations to avoid right-of-way encroachments, resolve conflict with property development, accommodate road/highway construction, allow for the construction of facilities

103

PEP-II Large Power Supplies Rebuild Program at SLAC  

SciTech Connect

Seven large power supplies (LGPS) with output ratings from 72kW to 270kW power PEP-II quad magnets in the electron-positron collider region. These supplies have posed serious maintenance and reliability problems since they were installed in 1997, resulting in loss of accelerator availability. A redesign/rebuild program was undertaken by the SLAC Power Conversion Department. During the 2004 summer shutdown all the control circuits in these supplies were redesigned and replaced. A new PWM control board, programmable logic controller, and touch panel have been installed to improve LGPS reliability, and to make troubleshooting easier. In this paper we present the details of this rebuilding program and results.

Bellomo, P.; Lipari, J.J.; de Lira, A.C.; Rafael, F.S.; /SLAC

2005-05-17T23:59:59.000Z

104

The FNAL Injector Upgrade Status  

SciTech Connect

The new FNAL H{sup -} injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H{sup -} source, low energy beam transport (LEBT), 200 MHz RFQ and medium energy beam transport (MEBT). Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.

Tan, C.Y.; Bollinger, D.S.; Duel, K.L.; Karns, P.R.; Lackey, J.R.; Pellico, W.A; Scarpine, V.E.; Tomlin, R.E.; /Fermilab

2012-05-14T23:59:59.000Z

105

Microsoft Word - CX-Chehalis-Raymond_rebuild_2010_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Eric Orth Project Manager - TEP-TPP-3 Proposed Action: Rebuild a 19 mile section of the Chehalis-Raymond No. 1, 115-kV transmission line from Chehalis Substation to Pe Ell Substation Budget Information: Work Order #248941 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not effect the environment beyond the previously developed facility area including but not limited to....tower modifications, changing insulators, and replacement of poles ...conductors...and crossarms. Location: The project is located in Lewis County, Washington along Bonneville Power

106

From Tragedy to Triumph - Rebuilding with Renewable Energy after Disaster, EERE (Fact Sheet)  

SciTech Connect

Fact sheet offering practical information about rebuilding using wind, geothermal, and biomass. Includes a list of resources. Highlights successful projects in Greensburg, Kansas.

Not Available

2009-10-01T23:59:59.000Z

107

From Tragedy to Triumph- Rebuilding with Renewable Energy after Disaster, EERE (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE))

Fact sheet offering practical information about rebuilding using wind, geothermal, and biomass. Includes a list of resources. Highlights successful projects in Greensburg, Kansas.

108

From Tragedy to Triumph - Resources for Rebuilding Green after Disaster, EERE (Fact Sheet)  

DOE Green Energy (OSTI)

Fact sheet offering resources for builders and architects to rebuild homes, businesses, and public buildings with energy efficiency and renewable energy such as wind, solar, and geothermal.

Not Available

2009-10-01T23:59:59.000Z

109

Rebuilding It Better: Greensburg, Kansas; High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised)  

SciTech Connect

This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007.

Not Available

2012-04-01T23:59:59.000Z

110

Upgrading a Multifuncoid ?  

E-Print Network (OSTI)

I define the concepts of multifuncoid (and completary multifuncoid) and upgrading. Then I conjecture that upgrading of certain multifuncoids are multifuncoids (and that upgrading certain completary multifuncoids are completary multifuncoids). I have proved the conjectures for n ? 2. This short article is the first my public writing where I introduce the concept of multidimensional funcoid which I am investigating now. Refer to this Web site for the theory which I now attempt to generalize. 1

L {x Ai

2012-01-01T23:59:59.000Z

111

A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Tale of Two Cities: Greensburg Rebuilds as a National Model for A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) This fact sheet provides a summary of how DOE and NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. 54901.pdf More Documents & Publications NREL Helps Greensburg Set the Model for Green Communities (Fact Sheet), Innovation: The Spectrum of Clean Energy Innovation, NREL (National Renewable Energy Laboratory) Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009

112

Substation voltage upgrading  

SciTech Connect

Substation voltage uprating, i.e., conversion of a substation from a lower rated voltage to a higher rated voltage without a complete substation rebuild, can lead to excellent economic benefits. Utilization of the old substation layout and/or the existing equipment, to some extent, is the practical objective of such an uprating. The objective of this project was to assess the opportunities for substation uprating in the industry, to establish feasibility for such uprating and to study methods for accomplishing it. The final aim of the project was to provide guidance to utilities interested in uprating. 56 refs., 41 figs., 18 tabs.

Panek, J.; Elahi, H.; Sublich, M. (General Electric Co., Schenectady, NY (USA). Systems Development and Engineering Dept.)

1989-08-01T23:59:59.000Z

113

Rebuilding It Better: City of Greensburg, Kansas, Business Incubator (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95% 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable rural community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are working with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. Ultimately, these technologies could be replicated in other communities recovering from disaster. City of Greensburg SunChips® Business Incubator One year after the tornado, construction began on the new City of Greensburg SunChips ® Business Incubator. The goal was to create a building that would provide affordable office space for small, start-up businesses in the town. The $2.9 million

114

Microsoft Word - CX-Colville-Republic_Rebuild_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eric Orth Eric Orth Project Manager - TEP-TPP-3 Proposed Action: Colville-Republic No. 1 115-kV rebuild project Budget Information: Work Order #00270698 PP&A Project No.: PP&A 1786 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designated purpose. B4.6, Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including...changing insulators, and replacement of poles, ...conductors, ...and crossarms.

115

Rebuilding It Better: City of Greensburg, Kansas, Business Incubator (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95% 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable rural community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are working with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. Ultimately, these technologies could be replicated in other communities recovering from disaster. City of Greensburg SunChips® Business Incubator One year after the tornado, construction began on the new City of Greensburg SunChips ® Business Incubator. The goal was to create a building that would provide affordable office space for small, start-up businesses in the town. The $2.9 million

116

Rebuilding It Better: Greensburg, Kansas. City Hall (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City Hall City Hall Destroyed in the tornado, City Hall has been rebuilt green incorporating solar panels, ground source heat pumps, reclaimed materials, and a vegetated roof. The building serves as a symbol of Greensburg's vitality and leadership in becoming a sustainable community where social, environmental, and economic concerns are held in balance. The new Greensburg City Hall is projected to achieve more than 38% energy savings compared to a similar building built to standard code due in part to the 4.8-kilowatt (kW) rooftop photovoltaic (PV) system and ground source heat pumps. REBUILDING IT BETTER: GREENSBURG, KANSAS LEED® Platinum Completed in October 2009, Greensburg City Hall achieved the U.S. Green Building Council's Leadership in Energy and Environmental Design

117

T10 SND UPGRADE  

E-Print Network (OSTI)

The program of upgrade of the Spherical Neutral Detector for future experiments at a new VEPP-2000 e + e ? collider is presented. Modernization includes upgrades of electromagnetic calorimeter, tracking system, detector electronics, data acquisition system, and offline software. It is also planned to equip the detector with two new subsystems: particle identification system based on aerogel ?erenkov counters and external electron tagging system for ?? physics. 1

unknown authors

2001-01-01T23:59:59.000Z

118

Optics upgrade for switchyard  

SciTech Connect

An upgrade of the Switchyard optics is proposed. This upgrade extends the P3 (old Main Ring) lattice through enclosure C. The septa for the 3-way Meson Area split is moved from enclosure F1 to enclosure M01. The functionality of the Meson Target Train is preserved. Finally, for the purpose of demonstrating that the resulting split can be transported, a straw-man lattice is proposed for enclosure M02 and beyond.

Kobilarcik, Thomas R.; /Fermilab

2005-08-01T23:59:59.000Z

119

ATLAS upgrade June09_v3  

NLE Websites -- All DOE Office Websites (Extended Search)

ATLAS efficiency and intensity upgrade ATLAS efficiency and intensity upgrade Guy Savard and Robert V. F. Janssens June 12, 2009 The ATLAS facility is on a constant quest to improve and increase the capabilities it offers to its Users. ATLAS currently provides beams of essentially all stable isotopes at energies in the vicinity of the Coulomb barrier. These can be used in conjunction with a suite of state-of-the-art instruments such as Gammasphere, the Fragment Mass Analyzer (FMA), the Canadian Penning Trap mass spectrometer (CPT), the split-pole spectrograph, an in-flight radioactive beam line, and the recently commissioned HELIOS spectrometer. At present, these capabilities are being augmented by (1) the addition of the CARIBU upgrade, which will provide low-intensity, neutron-rich radioactive beams from Californium fission fragments in both low-energy and re-

120

DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Three Projects to Help the Gulf Coast Recover and Three Projects to Help the Gulf Coast Recover and Rebuild DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild January 20, 2006 - 10:52am Addthis ROBINSONVILLE, MS - Energy Secretary Samuel W. Bodman today announced three Department of Energy (DOE) initiatives to help the people in the Gulf coast region recover from the hurricanes in 2005, as well as prevent loss of life and damage in the future. During his speech to the Energy Leadership Forum, the secretary announced that DOE will donate 400,000 hours of supercomputing time at its National Energy Research Scientific Computing Center (NERSC) to the U.S. Army Corps of Engineers to assist with the rebuilding of levees. DOE is also offering hurricane-affected residents free rebuilding workshops providing expert advice on the latest

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Tale of Two Cities: Greensburg Rebuilds as a National Model for A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) This fact sheet provides a summary of how DOE and NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. 54901.pdf More Documents & Publications NREL Helps Greensburg Set the Model for Green Communities (Fact Sheet), Innovation: The Spectrum of Clean Energy Innovation, NREL (National Renewable Energy Laboratory) Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID)

122

DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Three Projects to Help the Gulf Coast Recover and Announces Three Projects to Help the Gulf Coast Recover and Rebuild DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild January 20, 2006 - 10:52am Addthis ROBINSONVILLE, MS - Energy Secretary Samuel W. Bodman today announced three Department of Energy (DOE) initiatives to help the people in the Gulf coast region recover from the hurricanes in 2005, as well as prevent loss of life and damage in the future. During his speech to the Energy Leadership Forum, the secretary announced that DOE will donate 400,000 hours of supercomputing time at its National Energy Research Scientific Computing Center (NERSC) to the U.S. Army Corps of Engineers to assist with the rebuilding of levees. DOE is also offering hurricane-affected residents free rebuilding workshops providing expert advice on the latest

123

Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet) (Revised)  

Science Conference Proceedings (OSTI)

This fact sheet provides a summary of how DOE and NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007.

Not Available

2012-08-01T23:59:59.000Z

124

Rebuilding It Better: Greensburg, Kansas; High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised)  

SciTech Connect

This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007.

2012-04-01T23:59:59.000Z

125

Upgrading Below Grade Spaces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patrick H. Huelman, Sam Breidenbach, Steve Schirber Patrick H. Huelman, Sam Breidenbach, Steve Schirber NorthernSTAR Building America Partnership Upgrading Below Grade Spaces Residential Energy Efficiency Stakeholder March 1, 2012 Austin, TX * Act 1: Technical Challenges & Opportunities - Pat Huelman, University of Minnesota * Act 2: Assessing Homeowner Priorities & Risks - Sam Breidenbach, TDS Custom Construction * Act 3: An Industry Perspective - Steve Schirber, Cocoon Act 1. Upgrade Below Grade * Basement Remodeling: It Doesn't Get Any Riskier! - Combustion safety - Foundation moisture - Radon (& other soil gases) - Biologicals (mold, dust mites, etc.) - Garage gases (if attached) * And front and center are uncontrolled... - negative pressures in basements (beyond stack)

126

AGS intensity upgrades  

SciTech Connect

After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10{sup 13} protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four.

Roser, T.

1995-12-01T23:59:59.000Z

127

Biochemical upgrading of oils  

DOE Patents (OSTI)

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing in organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed.

Premuzic, Eugene T. (East Moriches, NY); Lin, Mow S. (Rocky Point, NY)

1999-01-12T23:59:59.000Z

128

Biochemical upgrading of oils  

DOE Patents (OSTI)

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

Premuzic, E.T.; Lin, M.S.

1999-01-12T23:59:59.000Z

129

The upgrade of GEO600  

E-Print Network (OSTI)

The German / British gravitational wave detector GEO 600 is in the process of being upgraded. The upgrading process of GEO 600, called GEO-HF, will concentrate on the improvement of the sensitivity for high frequency signals and the demonstration of advanced technologies. In the years 2009 to 2011 the detector will undergo a series of upgrade steps, which are described in this paper.

Harald Lück; Christopf Affeldt; Jerome Degallaix; Andreas Freise; Hartmut Grote; Martin Hewitson; Stefan Hild; Jonathan Leong; Mirko Prijatelj; Kenneth A. Strain; Benno Willke; Holger Wittel; Karsten Danzmann

2010-04-02T23:59:59.000Z

130

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendix H: Educational and Outreach Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Appendix H: Educational and Outreach Materials Page H.1 Rebuilding After Disaster-Going Green from the Ground Up ............... 608 H.2 Greensburg, Kansas-A Better, Greener Place to Live ......................... 633 H.3 From Tragedy to Triumph-Rebuilding Green Homes after Disaster ..... 642 H.4 From Tragedy to Triumph-Rebuilding Green Buildings after Disaster . 647 H.5 From Tragedy to Triumph-Rebuilding with Renewable Energy after Disaster .................................................................................................. 652 H.6 From Tragedy to Triumph-Resources for Rebuilding Green after Disaster .................................................................................................. 657 H.7 Rebuilding It Better-BTI-Greensburg John Deere Dealership .............. 662

131

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

132

CRYOGENICS IN BEPCII UPGRADE.  

SciTech Connect

THIS PAPER PRESENTS A CRYOGENIC DESIGN FOR UPGRADING THE BEIJING ELECTRON POSITRON COLLIDER AT THE INSTITUTE OF HIGH ENERGY PHYSICS IN BEIJING. THE UPGRADE INVOLVES 3 NEW SUPERCONDUCTING FACILITIES, THE INTERACTION REGION QUADRUPOLE MAGNETS, THE DETECTOR SOLENOID MAGNETS AND THE SRF CAVITIES. FOR COOLING OF THESE DEVICES, A NEW CRYPLANT WITH A TOTAL CAPACITY OF 1.0KW AT 4.5K IS TO BE BUILT AT IHEP. AN INTEGRATED CRYOGENIC DESIGN TO FIT THE BEPCII CRYOGENIC LOADS WITH HIGH EFFICIENCY IS CARRIEDOUT USING COMPUTATIONAL PROCESS ANALYSIS SOFTWARE WITH THE EMPHASES ON ECONOMICS AND SAFETY IN BOTH CONSTRUCTION AND OPERATION OF THE PLANT. THIS PAPER DESCRIBES THE CRYOGENIC CHARACTERISTICS OF EACH SUPERCONDUCTING DEVICE, THEIR COOLING SCHEMES AND THE OVERALL CRYOPLANT.

JIA,L.; WANG,L.; LI,S.

2002-07-22T23:59:59.000Z

133

The LHCb VELO Upgrade  

E-Print Network (OSTI)

LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip silicon detector surrounding the interaction point, providing tracking and vertexing measurements. The upgrade of the LHCb experiment, planned for 2018, will increase the luminosity up to $\\rm 2\\times10^{33}\\ cm^{-2}s^{-1}$ and will perform the readout as a trigger-less system with an event rate of 40 MHz. Extremely non-uniform radiation doses will reach up to $\\rm 5 \\times 10^{15}$ 1 MeV$\\rm n_{eq}/cm^2$ in the innermost regions of the VELO sensors, and the output data bandwidth will be increased by a factor of 40. An upgraded detector is under development based in a pixel sensor of the Timepix/Medipix family, with 55 x 55 $\\rm \\mu m^2$ pixels. In addition a microstrip solution with finer pitch, higher granularity and thinner than the current detector is being developed in parallel. The current status of the VELO upgrade program will be described together with recent testbeam results.

Rodriguez Perez P.; LHCb VELO Group

2013-02-25T23:59:59.000Z

134

Rebuilding It Better: BTI-Greensburg John Deere Dealership | Open Energy  

Open Energy Info (EERE)

BTI-Greensburg John Deere Dealership BTI-Greensburg John Deere Dealership Jump to: navigation, search Name Rebuilding It Better: BTI-Greensburg John Deere Dealership Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals Resource Type Case studies/examples Availability Publicly available--Free Publication Date 5/1/2009 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: BTI-Greensburg John Deere Dealership [1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References Overview The city of Greensburg, Kansas, is rebuilding as a model green community

135

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, as a Model Green Community: A Case Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007. 45135-2_front_matter.pdf 45135-2_appendix-a.pdf 45135-2_appendix-b.pdf 45135-2_appendix-c.pdf 45135-2_appendix-d.pdf 45135-2_appendix-e.pdf 45135-2_appendix-f.pdf 45135-2_appendix-g.pdf 45135-2_appendix-h.pdf More Documents & Publications Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;

136

Rebuilding a Greener New Orleans on Veteran's Day | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuilding a Greener New Orleans on Veteran's Day Rebuilding a Greener New Orleans on Veteran's Day Rebuilding a Greener New Orleans on Veteran's Day Addthis 1 of 9 A home in New Orleans being restored by the St. Bernard Project. Image: Energy Department Image | Photo by Quentin Kruger, Contractor 2 of 9 Secretary Steven Chu arrives at a home in New Orleans to join veterans in reconstruction work. Image: Energy Department Image | Photo by Quentin Kruger, Contractor 3 of 9 Louisiana Congressman Joseph Cao and Zachary Rosenburg, CEO for The Saint Bernard Project, greet Secretary Chu at a home in the early stages of the reconstruction process. Image: Energy Department Image | Photo by Quentin Kruger, Contractor 4 of 9 Secretary Chu mudding walls in the back bedroom. Image: Energy Department Image | Photo by Quentin Kruger, Contractor

137

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, as a Model Green Community: A Case Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007. 45135-2_front_matter.pdf 45135-2_appendix-a.pdf 45135-2_appendix-b.pdf 45135-2_appendix-c.pdf 45135-2_appendix-d.pdf 45135-2_appendix-e.pdf 45135-2_appendix-f.pdf 45135-2_appendix-g.pdf 45135-2_appendix-h.pdf More Documents & Publications Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;

138

U.S. Energy Secretary Steven Chu to Help Rebuild Homes in New Orleans on  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steven Chu to Help Rebuild Homes in New Steven Chu to Help Rebuild Homes in New Orleans on Veterans Day U.S. Energy Secretary Steven Chu to Help Rebuild Homes in New Orleans on Veterans Day November 9, 2010 - 12:00am Addthis Washington D.C. --- Underscoring the Obama Administration's commitment to community service, U.S. Energy Secretary Steven Chu will travel to New Orleans on Veterans Day, a national day of service, to volunteer at a home construction site with the St. Bernard Project, a group dedicated to creating ongoing housing opportunities for community residents in the wake of Hurricane Katrina. Working with the Wounded Warrior program, a non-profit group that helps find meaningful work for service men and women, St. Bernard Project trains and employs injured active duty soldiers and veterans in transition after their service. Details about the event are

139

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, as a Model Green Community: A Case Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007. 45135-1.pdf More Documents & Publications A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) NREL Helps Greensburg Set the Model for Green Communities (Fact Sheet), Innovation: The Spectrum of Clean Energy Innovation, NREL (National

140

From Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100%  

Open Energy Info (EERE)

Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100% Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100% Renewable Energy City Jump to: navigation, search Name From Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100% Renewable Energy City Agency/Company /Organization National Renewable Energy Laboratory Focus Area Agriculture, Buildings, Commercial, Residential, Economic Development, Energy Efficiency, Industry, People and Policy, Transportation, Water Conservation, Renewable Energy, Biomass, Ground Source Heat Pumps, Water Power, Solar, - Solar Hot Water, - Solar Pv, Wind Phase Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes Resource Type Case studies/examples

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Global Scratch Upgrade in Progress  

NLE Websites -- All DOE Office Websites (Extended Search)

Global Scratch Gets Global Scratch Gets an Upgrade Global Scratch Gets an Upgrade Improvements Will Include Higher Data Output Rates, Connection to PDSF October 29, 2013 The most used file system at the National Energy Research Scientific Computing Center (NERSC)-global scratch-just got an upgrade. As a result, some users may see their data output to global scratch reach up to 80 gigabytes per second. Although users will probably not see their 20-terabyte storage quotas increase, the upgrade ensures that global scratch remains flexible and paves the way for PDSF to eventually use the file system Because of the upgrade, users will also be able to better access their temporary data files or "scratch data" from any NERSC system, not just the one that generated it. Prior to the upgrade, Global scratch typically

142

Upgrading of TREAT experimental capabilities  

Science Conference Proceedings (OSTI)

The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system.

Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

1982-01-01T23:59:59.000Z

143

Upgraded Coal Interest Group  

Science Conference Proceedings (OSTI)

The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

Evan Hughes

2009-01-08T23:59:59.000Z

144

Energy Star Building Upgrade Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

program helping businesses and individuals fight global warming through superior energy efficiency. ENERGY STAR Building Upgrade Manual United States Environmental Protection...

145

Rebuilding your flooded home: Guidelines for incorporating energy efficiency  

SciTech Connect

Repairs to your flood-damaged home can add energy efficiency at the same time you address pressing structural needs, mainly by replacing and upgrading insulation in walls and floors, and checking your foundation for flood damage. Many energy efficiency options are available to you today that may not have been widely available when you built your house even if that was only a few years ago. Cost-effectiveness depends on several factors, including cost of fuel and materials, efficiency levels of the structure and components, and climate. This booklet offers some general tips to improve the efficiency of your home`s shell and equipment. Additional information on any issue covered in this booklet is available from various agencies within or near your community, including your state energy office, local community action agency, utilities, Red Cross and Federal Emergency Management Agency (FEMA) offices.

1994-05-01T23:59:59.000Z

146

Energy Efficiency Upgrades  

Science Conference Proceedings (OSTI)

The energy efficiency upgrades project at Hardin County General Hospital did not include research nor was it a demonstration project. The project enabled the hospital to replace outdated systems with modern efficient models. Hardin County General Hospital is a 501c3, nonprofit hospital and the sole community provider for Hardin and Pope Counties of Illinois. This project provided much needed equipment and facility upgrades that would not have been possible through locally generated funding. Task 1 was a reroofing of the hospital. The hospital architect designed the replacement to increase the energy efficiency of the hospital roof/ceiling structure. Task 2 was replacement and installation of a new more efficient CT scanner for the hospital. Included in the project was replacement of HVAC equipment for the entire radiological suite. Task 5 was a replacement and installation of a new higher capacity diesel-fueled emergency generator for the hospital replacing a 50+ year old gas-fired generator. Task 7 was the replacement of 50+ year-old walk-in cooler/freezer with a newer, energy efficient model. Task 8 was the replacement of 10+ year-old washing machines in the hospital laundry with higher capacity, energy efficient models. Task 9 was replacement of 50-year old single pane curtain window system with double-pane insulated windows. Additionally, insulation was added around ventilation systems and the curtain wall system.

Roby Williams

2012-03-29T23:59:59.000Z

147

Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure)  

SciTech Connect

20-page "how-to" guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster.

Not Available

2009-10-01T23:59:59.000Z

148

Tenneco upgrades natural gasoline  

SciTech Connect

Tenneco Oil Co. recently completed a natural gasoline upgrading project at its LaPorte, Tex., facility. The project was started in October 1985. The purpose was to fractionate natural gasoline and isomerize the n-pentane component. Three factors made this a particularly attractive project for the LaPorte complex: 1. The phase down of lead in gasoline made further processing of natural gasoline desirable. 2. Idle equipment and trained personnel were available at the plant as a result of a switch of Tenneco's natural gas liquids (NGL) fractionation to its Mont Belvieu, Tex., facility. 3. The plant interconnects with Houston's local markets. It has pipelines to Mont Belvieu, Texas City, and plants along the Houston Ship Channel, as well as truck, tank car, and barge-loading facilities. Here are the details on the operation of the facilities, the changes which were required to enable the plant to operate successfully, and how this conversion was completed in a timely fashion.

O'Gorman, E.K.

1986-08-01T23:59:59.000Z

149

Upgrade of the Proton West secondary beamline  

SciTech Connect

As originally designed and operated, protons entering PW6 were steered by a series of EPB dipoles into a single interaction length beryllium target, some 43 feet from the enclosure wall. Ensuing secondary beams, either p{sup +}/{pi}{sup +} or p{sup -}/{pi}{sup -}, were collected by a string of quadrupoles following the target, steered westward, away from the Proton Center line, through PW6 and PW7, and ultimately focussed on experiment production targets located within the large PW8 hall. Around the Spring of 1988 it was decided to upgrade the existing Proton West secondary beamline to allow for transport of a primary proton beam, anticipated to be either 800 or 900 GeV/c, through PW8. This upgrade project, which is now nearing completion, was largely motivated by the then recent approval of E-771, a hadronic beauty production experiment located in PW8. E-771 represents the third in a series of experiments for the large-acceptance dimuon spectrometer presently located at the end of the Proton West beamline. This Technical Memo is a summary of the upgrade --- an explanation of the underlying strategy and a documentation of the final locations of the secondary beamline elements. 6 refs., 2 figs., 2 tabs.

Spiegel, L.

1989-10-10T23:59:59.000Z

150

NSLS control system upgrade status  

SciTech Connect

The NSLS control system initially installed in 1978 has undergone several modifications but the basic system architecture remained relatively unchanged. The need for faster response, increased reliability and better diagnostics made the control system upgrade a priority. Since the NSLS runs continuously, major changes to the control system are difficult. The upgrade plan had to allow continuous incremental changes to the control system without having any detrimental effect on operations. The plan had to provide for immediate improvement in a few key areas, such as data access rates, and be complete in a short time. At present, most accelerator operations utilize the upgraded control system.

Smith, J.; Ramamoorthy, S.; Tang, Y.; Flannigan, J.; Sathe, S.; Keane, J.; Krinsky, S.

1993-07-01T23:59:59.000Z

151

Rebuilding plan implementation in New Orleans, LA : a case study of Freret Street Commercial Corridor and Bayou Road Cultural Corridor  

E-Print Network (OSTI)

Three major rebuilding plans emerged from the planning process that followed the devastation of Hurricane Katrina in New Orleans. Outlining the visions and goals of individual communities across New Orleans, the intent of ...

Alao, Oreoluwa

2008-01-01T23:59:59.000Z

152

Dynamic Mercury Cycling Model Upgrade  

Science Conference Proceedings (OSTI)

This technical update describes the status of activities to upgrade the Dynamic Mercury Cycling Model (D-MCM), an EPRI simulation model that predicts mercury cycling and bioaccumulation in lakes.

2008-12-17T23:59:59.000Z

153

Rebuilding It Better; BTI-Greensburg, John Deere Dealership (Brochure) (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BTI-Greensburg BTI-Greensburg John Deere Dealership Rebuilding It Better On May 4 th , 2007, brothers Kelly and Mike Estes saw their BTI-Greensburg John Deere Dealership ruined by an EF-5 tornado. They were not alone in their loss-95% of the town was destroyed that day. So they were overwhelmed the next morning when more than 100 customers and friends arrived to help them salvage what they could. To support the community that helped them so much, Kelly, Mike, and their family committed to rebuilding their business in a better, greener way. They wanted the new 28,000 ft 2 prefabricated metal building to house the world's greenest farm machinery business, attain a LEED ® Platinum rating, and use the least energy possible. And they did all they could to reach these goals.

154

Status of the ATF Damping Ring BPM Upgrade Project  

Science Conference Proceedings (OSTI)

A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it's finalization are presented.

Briegel, C.; /Fermilab; Eddy, N.; /Fermilab; Haynes, B.; /Fermilab; May, J.; /SLAC; McCormick, D.; /SLAC; Nelson, J.; /SLAC; Nicklaus, D.; /Fermilab; Prieto, P.; /Fermilab; Rechenmacher, R.; /Fermilab; Smith, T.; /SLAC; Teranuma, N.; /KEK, Tsukuba; Urakawa, J.; /KEK, Tsukuba; Voy, D.; /Fermilab; Wendt, M.; /Fermilab; Woodley, M.; /SLAC

2011-12-01T23:59:59.000Z

155

User and Performance Impacts from Franklin Upgrades  

SciTech Connect

The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

He, Yun (Helen)

2009-05-10T23:59:59.000Z

156

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations.

157

Substation voltage upgrading  

SciTech Connect

This report addresses specific issues to support sound yet not unduly conservative uprating practices for substations. The main parts of the report cover the insulation withstand and overvoltage protection aspects, environmental measurements, reliability criteria, and industry experience. First the insulation design concerns are addressed. Substation stress by a backflashover of the line insulation due to lightning in the vicinity of the substation is recognized as a critical stress. A representative part of a 550 kV BIL substation was erected at the EPRI High Voltage Transmission Research Center, where also a special test circuit was assembled to produce a fast front, slow tail (0.2/200 {mu}s) wave. The substation as well as some special configurations were tested for line-to-ground and line-to-line withstand. Computer studies were performed to complement the test results. A number of important conclusions was reached. The most prominent result in that the high frequency oscillations, as caused by reflections within the substation, do not effect the Critical Flashover Voltage (CFO). The present practice, based on the highest peak is therefore very conservative. The slow tail of the wave appears to dictate the CFO. An arrester model for computer studies to represent very fast as well as slow phenomena was derived. It is based on full scale arrester test data, made available in this project. The computer program to calculate arrester model parameters is also a part of the report. The electric environmental measurements are reported for the tested substation at the HVTRC and for the uprated substation of Public Service Company of Colorado, both before and after the uprating. The performance is satisfactory when corona free hardware is used. Insulation design criteria are analyzed based on substation reliability, the system viewpoint and consequences of the failure. Utility experience with uprated substations is reviewed.

Panek, J.; Elahi, H.; Lux, A.; Imece, A.F. (General Electric Co., Schenectady, NY (United States). Power Systems Engineering Dept.); LaPanse, R.A.; Stewart, J.R. (Public Service Co. of Colorado, Denver, CO (United States))

1992-04-01T23:59:59.000Z

158

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

159

upgrade | OpenEI Community  

Open Energy Info (EERE)

4 4 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235354 Varnish cache server upgrade Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 22 October, 2012 - 07:23 Semantic Mediawiki Semantic Forms update developer Incentives and Policies Semantic Mediawiki upgrade Utility Rates We have just updated Semantic Forms on OpenEI to version 2.4 to enable some upgrades to the utility rate forms (thanks Teresa!). If you see any problems in forms you use on OpenEI, please notify us by commenting on this

160

The D0 detector upgrade  

SciTech Connect

The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector.

Bross, A.D.

1995-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ENERGY STAR Building Upgrade Manual Chapter 9: Heating and Cooling...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 9: Heating and Cooling Upgrades The Building Upgrade...

162

CATEGORICAL EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, 300 AREA, HANFORD SITE, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to upgrade a landscaping irrigation system in the 300 Area. Location of Action: In the landscaped area around the 331 Building, Hanford Site Description of the Proposed Action: The proposed action is to upgrade the existing 331 Building landscaping irrigation system by using nearby aquaculture effluent instead of

163

Upgrading the Radioactive Waste Management Infrastructure in Azerbaijan  

Science Conference Proceedings (OSTI)

Radionuclide uses in Azerbaijan are limited to peaceful applications in the industry, medicine, agriculture and research. The Baku Radioactive Waste Site (BRWS) 'IZOTOP' is the State agency for radioactive waste management and radioactive materials transport. The radioactive waste processing, storage and disposal facility is operated by IZOTOP since 1963 being significantly upgraded from 1998 to be brought into line with international requirements. The BRWS 'IZOTOP' is currently equipped with state-of-art devices and equipment contributing to the upgrade the radioactive waste management infrastructure in Azerbaijan in line with current internationally accepted practices. The IAEA supports Azerbaijan specialists in preparing syllabus and methodological materials for the Training Centre that is currently being organized on the base of the Azerbaijan BRWS 'IZOTOPE' for education of specialists in the area of safety management of radioactive waste: collection, sorting, processing, conditioning, storage and transportation. (authors)

Huseynov, A. [Baku Radioactive Waste Site IZOTOP, Baku (Azerbaijan); Batyukhnova, O. [State Unitary Enterprise Scientific and Industrial Association Radon, Moscow (Russian Federation); Ojovan, M. [Sheffield Univ., Immobilisation Science Lab. (United Kingdom); Rowat, J. [International Atomic Energy Agency, Dept. of Nuclear Safety and Security, Vienna (Austria)

2007-07-01T23:59:59.000Z

164

Investment and Upgrade in Distributed Generation under Uncertainty  

E-Print Network (OSTI)

AS, Marnay, C. Distributed generation investment by aand Upgrade in Distributed Generation under Uncertaintyand Upgrade in Distributed Generation under Uncertainty ?

Siddiqui, Afzal

2008-01-01T23:59:59.000Z

165

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuilding Greensburg, Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study NREL's Technical Assistance to Greensburg June 2007 - May 2009 National Renewable Energy Laboratory Innovation for Our Energy Future Sponsorship Format Reversed Horizontal Format-B Reversed Vertical Format Reversed-A Vertical Format Reversed-B National Renewable Energy Laboratory Innovation for Our Energy Future National Renewable Energy Laboratory Innovation for Our Energy Future Horizontal Format-A Reversed National Renewable Energy Laboratory Innovation for Our Energy Future NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

166

From Tragedy to Triumph: Rebuilding Greensburg, Kansas To Be a 100% Renewable Energy City; Preprint  

SciTech Connect

On May 4, 2007, Greensburg, Kansas, was hit by a 1.7-mile wide tornado with 200 mph-plus wind speeds. This tornado destroyed or severely damaged 90% of Greensburg?s structures. We discuss the progress made in rebuilding Greensburg, with a focus on the built environment and on meeting Greensburg?s goal of 100% renewable energy, 100% of the time. We also discuss key disaster recovery efforts that enabled Greensburg to reach this goal. Key strategies included a Sustainable Comprehensive Master Plan, an ordinance resolving that city-owned buildings achieve LEED Platinum and 42% energy savings, a strong focus on rebuilding 'right' with an integrated design process, attracting significant and sustained technical experts and national media attention, and linking renewable and energy efficiency technologies to business development. After three years, more than half the homes that have been rebuilt are rated at an average of 40% energy savings. All significant commercial buildings, including the school, hospital, banks, courthouse, and retail buildings, have been rebuilt to LEED Gold and Platinum standards and exceed 40% savings, with many exceeding 50% savings. Greensburg recently constructed a 12.5-MW community wind farm to provide all the remaining energy needed for its energy-efficient buildings and homes.

Pless, S.; Billman, L.; Wallach, D.

2010-08-01T23:59:59.000Z

167

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

168

About: Why Energy Efficiency Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

Why Energy Efficiency Upgrades Why Energy Efficiency Upgrades Two photos side by side showing energy loss through the use of infrared technology. As part of a home energy evaluation, an energy professional can use an infrared camera to pinpoint where air leaks and drafts are occurring in your home or building. Although normally difficult to see, these infrared photos clearly show in color where energy losses are occurring in a typical house. How We Use Energy in Our Buildings How We Use Energy in Our Homes (% of Energy Consumption) A pie chart illustrating the following breakdown: Space heating 43%, space cooling 9.7%, water heating 17.1%, lighting 6.2%, refrigeration 3.9%, electronics 3%, wet cleaning 3.2%, cooking 3.1%, computers 1.6%. Source: 2010 Buildings Energy Data Book, Table 2.1.6

169

MIPP Plastic Ball electronics upgrade  

SciTech Connect

An upgrade electronics design for Plastic Ball detector is described. The Plastic Ball detector was a part of several experiments in the past and its back portion (proposed to be used in MIPP) consists of 340 photomultipliers equipped with a sandwich scintillator. The scintillator sandwich has fast and slow signal component with decay times 10 ns and 1 {micro}s respectively. The upgraded MIPP experiment will collect up to 12,000 events during each 4 second spill and read them out in {approx}50 seconds between spills. The MIPP data acquisition system will employ deadtime-less concept successfully implemented in Muon Electronics of Dzero experiment at Fermilab. An 8-channel prototype design of the Plastic Ball Front End (PBFE) implementing these requirements is discussed. Details of the schematic design, simulation and prototype test results are discussed.

Baldin, Boris; /Fermilab

2009-01-01T23:59:59.000Z

170

Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades. Final report  

Science Conference Proceedings (OSTI)

As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility`s planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S&S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS.

Edmunds, T.; Saleh, R.; Zevanove, S.

1992-02-01T23:59:59.000Z

171

Energy Upgrade California | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrade California Upgrade California Energy Upgrade California < Back Eligibility Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Sealing Your Home Ventilation Manufacturing Heating Windows, Doors, & Skylights Program Info Funding Source The American Reinvestment and Recovery Act of 2009, ratepayer funds State California Program Type State Rebate Program Rebate Amount Basic Upgrade Package: 1,000 Advance Upgrade Package: 1,500 - 4,000 The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified contractors, and helps homeowners find all the available incentives from their local

172

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

Science Conference Proceedings (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench-scale. Natural gas upgrading systems have six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration has been initiated. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study. The project is on schedule and on budget. Task 4, a bench-scale demonstration of the ultra-fast TSA system is complete. Rapid thermal swing of an adsorbent bed using microchannels has been successfully demonstrated and the separation of a 70% methane and 30% nitrogen was purified to 92% methane. The bench-scale demonstration unit was small relative to the system dead volume for the initial phase of experiments and a purge step was added to sweep the dead volume prior to desorbing the bed and measuring purity. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement.

Anna Lee Tonkovich

2005-07-01T23:59:59.000Z

173

Rebuilding it Better: Greensburg, Kansas, Kiowa County Memorial Hospital (Brochure) (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kiowa County Memorial Hospital Kiowa County Memorial Hospital The original Kiowa County Hospital was destroyed in the tornado and rebuilt green. In fact, the hospital's design team took one of the most energy-intensive building types and designed a first-of-its kind energy-efficient hospital, while still meeting functional and safety requirements. The 50,000 square-foot building includes 15 acute-care beds, rural health and specialty clinics, an emergency department with two trauma rooms, physical/occu- pational therapy and radiology departments, a laboratory, and other support areas. The new hospital in Greensburg is projected to achieve more than 40% energy savings when compared to a hospital built to standard code thanks to features such as an on-site wind turbine. REBUILDING IT BETTER: GREENSBURG, KANSAS

174

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study |  

Open Energy Info (EERE)

Kansas, as a Model Green Community: A Case Study Kansas, as a Model Green Community: A Case Study Jump to: navigation, search Name Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study Agency/Company /Organization National Renewable Energy Laboratory Sector Energy Focus Area Agriculture, Buildings, Commercial, Residential, Other, Energy Efficiency - Central Plant, Energy Efficiency - Utility, Economic Development, Energy Efficiency, Other, Non-renewable Energy, People and Policy, Transportation, Water Conservation, Renewable Energy, Biomass, Geothermal, Ground Source Heat Pumps, Hydrogen and Fuel Cells, Solar, - Solar Hot Water, - Solar Pv, Wind Phase Bring the Right People Together, Determine Baseline, Evaluate Options, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes

175

From Tragedy to Triumph - Rebuilding Green Homes after Disaster (Revised) (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tragedy Tragedy to Triumph- Rebuilding Green Homes after Disaster About Green Homes A green home can save you thousands in utility bills and make your home a healthier and more comfortable place to live. Green homes save money with energy-saving features such as effective insulation, high-performance windows, tight construction, and efficient heating and cooling equipment and appliances. Green homes are healthier because they perform better and use green products, protecting homeowners against cold, heat, drafts, moisture, indoor pollutants, and noise. Green homes also protect homeowners against future utility rate increases for gas and electricity. Green homes encourage the use of renewable energy, which can reduce your home's impact on the environment

176

From Tragedy to Triumph - Rebuilding with Renewable Energy after Disaster, EERE (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Science & Technology Facility at the National Renewable Energy Laboratory in Golden, Science & Technology Facility at the National Renewable Energy Laboratory in Golden, Colorado, incorporates a number of advanced energy efficiency and green building concepts. For example, the architecture makes good use of natural light wherever possible, and an automated system dims unnecessary artificial lighting to reduce electricity use. Pat Corkery / PIX15442 From Tragedy to Triumph-Rebuilding with Renewable Energy after Disaster Renewable energy is generated from sources that are "green" and naturally replenished such as sunlight, wind, and geothermal heat. This energy can power, heat, and cool buildings, and can replace traditional sources of fuel (e.g., coal and natural gas) used by utilities. Most utilities are using wind power, but

177

From Tragedy to Triumph - Resources for Rebuilding Green after Disaster, EERE (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Laboratory's Science & Technology facility is designed to Renewable Energy Laboratory's Science & Technology facility is designed to encompass advanced energy efficiency and "green building" concepts in systems such as lighting and HVAC. Bill Timmerman, NREL/PIX 14963 From Tragedy to Triumph-Resources for Rebuilding Green after Disaster These resources offer builders and architects information about building healthier, more comfortable, and more energy-efficient homes, businesses, and public buildings. Financial Incentives Numerous financial incentives, such as federal and state tax credits and util- ity rebates, are available to help offset the cost of a renewable energy system. Many utility companies also offer net metering for renewable energy systems that are connected to the grid. And the

178

Rebuilding After Disaster: Going Green from the Ground Up | Open Energy  

Open Energy Info (EERE)

After Disaster: Going Green from the Ground Up After Disaster: Going Green from the Ground Up Jump to: navigation, search Name Rebuilding After Disaster: Going Green from the Ground Up Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, People and Policy, Transportation, Water Conservation, Renewable Energy, Biomass, Geothermal, Ground Source Heat Pumps, Solar, - Solar Hot Water, - Solar Pv, Biomass - Waste To Energy, Wind Phase Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes Resource Type Case studies/examples Availability Publicly available--Free Publication Date 10/1/2009

179

From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BTI-Greensburg John Deere Dealership is up and running now and being put to the BTI-Greensburg John Deere Dealership is up and running now and being put to the test. To ensure the systems operate as planned, the Estes brothers are undergoing a commissioning process where everything is examined: lighting systems, mechanical systems, materials used, plumbing, and more. This continuous evaluation is critical to keep an efficient, sustainable building running smoothly. Courtesy of BTI-Greensburg/PIX 16647 From Tragedy to Triumph-Rebuilding Green Buildings after Disaster About Green Buildings Green buildings save thousands in utility bills while making the indoor environment healthier and more com- fortable for occupants. According to the U.S. Green Building Council, green commercial and public buildings on average use up to 50% less energy, emit

180

Monitoring and Verification Procedures Used in the Texas LoanSTAR and Rebuild America Programs  

E-Print Network (OSTI)

The monitoring and verification procedures that have been developed for the Texas LoanSTAR program and the ESL's Rebuild America Program have become a foundation for a number of other state and federal M&V programs, including the United States Department of Energy's (USDOE's) 1996 NEMVP, 1997 IPMVP, 2001 IPMVP, ASHRAE's GP 14P, and the 1999 Texas Performance Contracting Guidelines. This paper reviews the basic procedures that are used for monitoring and verifying energy savings in commercial buildings that receive energy conservation retrofits, including procedures that are used for measuring energy savings in buildings where hourly pre-retrofit and post-retrofit whole-building data have been collected; buildings where monthly pre-retrofit and hourly post-retrofit data are collected; and buildings where monthly preretrofit and monthly post-retrofit data are used to verify savings.

Farouz, S.; Baltazar-Cervantes, J. C.; Haberl, J. S.; Claridge, D. E.

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

From Tragedy to Triumph: Rebuilding Greensburg, Kansas To Be a 100% Renewable Energy City: Preprint  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conference Paper Conference Paper NREL/CP-550-48300 August 2010 From Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100% Renewable Energy City Preprint Shanti Pless and Lynn Billman National Renewable Energy Laboratory Daniel Wallach Greensburg GreenTown Presented at ACEEE Summer Study Pacific Grove, California August 15-20, 2010 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy, LLC (Alliance), a contractor of the US Government under Contract No. DE-AC36-08GO28308. Accordingly, the US Government and Alliance retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government.

182

Main Generator Excitation System Upgrade/Retrofit  

Science Conference Proceedings (OSTI)

Upgrading or replacing even a portion of the excitation system of a generator can provide increased reliability and availability while simultaneously decreasing operational and maintenance costs. However, the upgrade or retrofit of an excitation system is a major cost involving some degree of implementation, installation, or performance risk. This report provides lessons learned, experiences, practices and solutions from plants that have installed excitation system retrofits and upgrades. This informatio...

2005-11-07T23:59:59.000Z

183

MODTRAN cloud and multiple scattering upgrades with application to AVIRIS  

Science Conference Proceedings (OSTI)

Recent upgrades to the MODTRAN atmospheric radiation code improve the accuracy of its radiance predictions, especially in the presence of clouds and thick aerosols, and for multiple scattering in regions of strong molecular line absorption. The current public-released version of MODTRAN (MODTRAN3.7) features a generalized specification of cloud properties, while the current research version of MODTRAN (MODTRAN4) implements a correlated-k (CK) approach for more accurate calculation of multiple scattered radiance. Comparisons to cloud measurements demonstrate the viability of the CK approach. The impact of these upgrades on predictions for AVIRIS viewing scenarios is discussed for both clear and clouded skies; the CK approach provides refined predictions for AVIRIS nadir and near-nadir viewing.

Berk, A.; Bernstein, L.S.; Acharya, P.K.; Robertson, D.C.; Adler-Golden, S.M. [Spectral Sciences, Inc., Burlington, MA (United States)] [Spectral Sciences, Inc., Burlington, MA (United States); Anderson, G.P.; Chetwynd, J.H. [Air Force Research Lab., Hanscom AFB, MA (United States). Geophysics Directorate] [Air Force Research Lab., Hanscom AFB, MA (United States). Geophysics Directorate

1998-09-01T23:59:59.000Z

184

The Upgraded D0 detector  

Science Conference Proceedings (OSTI)

The D0 experiment enjoyed a very successful data-collection run at the Fermilab Tevatron collider between 1992 and 1996. Since then, the detector has been upgraded to take advantage of improvements to the Tevatron and to enhance its physics capabilities. We describe the new elements of the detector, including the silicon microstrip tracker, central fiber tracker, solenoidal magnet, preshower detectors, forward muon detector, and forward proton detector. The uranium/liquid-argon calorimeters and central muon detector, remaining from Run I, are discussed briefly. We also present the associated electronics, triggering, and data acquisition systems, along with the design and implementation of software specific to D0.

Abazov, V.M.; Abbott, B.; Abolins, M.; Acharya, B.S.; Adams, D.L.; Adams, M.; Adams, T.; Agelou, M.; Agram, J.-L.; Ahmed, S.N.; Ahn, S.H.; Ahsan, M.; Alexeev, G.D.; Alkhazov, G.; Alton, A.; Alverson, G.; Alves, G.A.; Anastasoaie, M.; Andeen, T.; Anderson, J.T.; Anderson, S.; /Buenos Aires U. /Rio de Janeiro, CBPF /Sao Paulo, IFT /Alberta U. /Simon Fraser U. /York U., Canada /McGill U. /Beijing, Inst. High Energy Phys. /Hefei, CUST /Andes U., Bogota /Charles U. /Prague, Tech. U. /Prague, Inst. Phys. /San Francisco de Quito U. /Clermont-Ferrand U. /LPSC, Grenoble /Marseille, CPPM /Orsay, LAL /Paris U., VI-VII /DAPNIA, Saclay /Strasbourg, IReS

2005-07-01T23:59:59.000Z

185

Rebuilding for Sustainability: Spatial Analysis of Bolivar Peninsula after Hurricane Ike  

E-Print Network (OSTI)

Recurring extreme events of nature challenge disaster-prone settlements in complex ways. Devastating property damages are one of the tests of survival for such settlements in both economic and social terms. It also provides unique opportunities to rethink the environment cleared by massive natural disasters. However, rebuilding for long-term resiliency is one of the least investigated areas, particularly when employing tacit knowledge in the sustainable recovery process. This study examines the post-disaster rebuilding process in spatial terms for Bolivar Peninsula in the aftermath of Hurricane Ike. It further investigates the nexus between connectivity among open space networks to various levels of surge damage among Bolivar spontaneous settlements. The study uses syntactical methods to measure axial connectivity of the Bolivar Peninsula access grid and one-way Analysis of Variance to interpret the way connectivity varies along the no damage to destroyed damage scale. In addition, the permeability rubric analyzes the elevation characteristics of houses that demonstrated higher probabilities of survival through a logistic regression. The conclusions are based on two basic premises. Local knowledge demands an indefinite time to be adapted and mobilized because of the increasing intensity of natural disasters. In addition, the high frequency of disaster events significantly challenges the versatility of local coping and survival strategies. The results reveal that the connectivity of the access grid has an inversely proportional relationship with various damage levels, particularly for no damage and destroyed. Furthermore, out of a number of resiliency characteristics listed in the literature, only ground elevation and ground enclosure demonstrated probability significances for survival. Potentially, the results of this research could support three significant outcomes pertaining to sustainable disaster recovery: preserving place character, social justice among affected groups, and promoting rapid recovery.

Subasinghe Arachchilage Don, Chamila Tharanga

2011-12-01T23:59:59.000Z

186

Upgrade Boilers with Energy-Efficient Burners  

SciTech Connect

This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

2006-01-01T23:59:59.000Z

187

Better Buildings Neighborhood Program: Energy Efficiency Upgrades...  

NLE Websites -- All DOE Office Websites (Extended Search)

PYC made the recommended energy efficiency upgrades, which included new insulation and air sealing, a new hot water heater, programmable thermostats, improved lighting, and new...

188

ENERGY STAR Building Upgrade Manual | ENERGY STAR  

NLE Websites -- All DOE Office Websites (Extended Search)

ENERGY STAR Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new...

189

Analysis Efforts Supporting NSTX Upgrades  

SciTech Connect

The National Spherical Torus Experiment (NSTX) is a low aspect ratio, spherical torus (ST) configuration device which is located at Princeton Plasma Physics Laboratory (PPPL) This device is presently being updated to enhance its physics by doubling the TF field to 1 Tesla and increasing the plasma current to 2 Mega-amperes. The upgrades include a replacement of the centerstack and addition of a second neutral beam. The upgrade analyses have two missions. The first is to support design of new components, principally the centerstack, the second is to qualify existing NSTX components for higher loads, which will increase by a factor of four. Cost efficiency was a design goal for new equipment qualification, and reanalysis of the existing components. Showing that older components can sustain the increased loads has been a challenging effort in which designs had to be developed that would limit loading on weaker components, and would minimize the extent of modifications needed. Two areas representing this effort have been chosen to describe in more details: analysis of the current distribution in the new TF inner legs, and, second, analysis of the out-of-plane support of the existing TF outer legs.

H.Zhang, P. Titus, P. Rogoff, A.Zolfaghari, D. Mangra, M. Smith

2010-11-29T23:59:59.000Z

190

Arizona | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Parker-Planet Tap 69-kV Transmission Line Rebuild, Upgrade and Right-Of-Way Action July 6, 2011 EIS-0480: Notice of Intent to Prepare a Draft...

191

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 (Report and Appendices)  

Science Conference Proceedings (OSTI)

This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007.

Billman, L.

2009-11-01T23:59:59.000Z

192

MMCR Upgrades: Present Status and Future Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

193

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

194

Future Upgrades | Brookhaven and the LHC  

NLE Websites -- All DOE Office Websites (Extended Search)

Future Upgrades Future Upgrades Magnetic field inside a Nb3Sn quadropole magnet Magnetic field inside a Nb3Sn quadropole magnet. Brookhaven leads various technical coordination efforts for the upgrade of the ATLAS detector, including constructing the new silicon tracker, liquid argon electronics, and the new muon chambers. Brookhaven also contributes to the commissioning and future upgrade of the LHC itself in two areas: accelerator physics and superconducting magnets. This work is carried out as part of the U.S. LHC Accelerator Research Program (LARP) in collaboration with Fermilab, Lawrence Berkeley National Lab, and the Stanford Linear Accelerator Center. The ultimate goal of the upgrade program is to increase the rate and efficiency of particle collisions, a measure known as luminosity.

195

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

196

APS Upgrade | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APS APS View Larger The brightness and energy of x-ray beams are critical properties for research. Higher brightness means more x-rays can be focused onto a smaller, laser-like spot, allowing researchers to gather more data in greater detail in less time. Higher energies allow x-rays to penetrate deeper inside materials to reveal crucial information about a material's structure and function. The combination of high brightness and high energy allows the observation and imaging - in real time - of fast and ultrafast technologically important processes, including fuel sprays, magnetic switching, and biological processes in living organisms. The APS Upgrade project will increase the brightness of the APS high-energy (hard) x-ray beams. This will equip researchers for the groundbreaking

197

APS Upgrade | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Workshop on new science opportunities provided by a multi-bend achromat lattice at the APS APS-U MBA Lattice Workshop Registration is now closed. Please contact Diane Wilkinson ext. 7810 or a member of the Workshop Organizing Committee for changes or modifications to your registration. Submit Comments, Suggestions, and Ideas for MBA Lattice Workshop October 21-22 Advanced Photon Source Argonne National Lab The Advanced Photon Source Upgrade is focused on delivering a powerful, versatile facility for science using high-brightness, high-energy X-rays. At APS, and around the light source community, scientists have been developing storage ring designs that push closer to the ultimate diffraction limit for X-ray sources. A recent report by the Basic Energy Sciences Advisory Committee, which advises the Director of the U.S.

198

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

Science Conference Proceedings (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench scale. The project is on schedule and on budget. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement. The system has six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration will be initiated in the next fiscal year. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study.

Anna Lee Tonkovich

2004-07-01T23:59:59.000Z

199

Energy Efficiency Through Lighting Upgrades  

Science Conference Proceedings (OSTI)

Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year�¢����s average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center; both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.

Kara Berst; Maria Howeth

2010-06-01T23:59:59.000Z

200

Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

About About Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades to someone by E-mail Share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Facebook Tweet about Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Twitter Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Google Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Delicious Rank Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Digg Find More places to share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on AddThis.com... Our History Related Federal Programs Why Energy Efficiency Upgrades

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Boiler Upgrades and Decentralizing Steam Systems Save Water and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval Air Station Oceana Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval...

202

Using QECBs for Public Building Upgrades: Reducing Energy Bills...  

NLE Websites -- All DOE Office Websites (Extended Search)

Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia Title Using QECBs for Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia...

203

EA-1321: Proposed Upgrade and Improvement of The National Synchrotron...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York EA-1321: Proposed Upgrade and Improvement of...

204

ENERGY STAR Building Upgrade Manual Chapter 13: Retail Stores...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 13: Retail Stores The Building Upgrade Manual is a...

205

ENERGY STAR Building Upgrade Manual Chapter 7: Supplemental Load...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 7: Supplemental Load Reduction The Building Upgrade...

206

ENERGY STAR Building Upgrade Manual Chapter 6: Lighting | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 6: Lighting The Building Upgrade Manual is a...

207

ENERGY STAR Building Upgrade Manual Chapter 5: Retrocommissioning...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 5: Retrocommissioning The Building Upgrade Manual is...

208

ENERGY STAR Building Upgrade Manual Chapter 12: Hotels and Motels...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 12: Hotels and Motels The Building Upgrade Manual is...

209

ENERGY STAR Building Upgrade Manual Chapter 10: K-12 Schools...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 10: K-12 Schools The Building Upgrade Manual is a...

210

ENERGY STAR Building Upgrade Manual Chapter 4: Financing | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 4: Financing The Building Upgrade Manual is a...

211

Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.  

DOE Green Energy (OSTI)

This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

United States. Bonneville Power Administration.

1995-03-01T23:59:59.000Z

212

Scientific Upgrades at the Oak Ridge National Laboratory High Flux Isotope Reactor  

Science Conference Proceedings (OSTI)

The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the High Flux Isotope Reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: (1) larger beam tubes, (2) a new monochromator drum for the HB-1 beam line, (3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, (4) new instruments for the HB-2 beamline, (5) a new monochromator drum for the HB-3 beam line, (6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, (7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, (8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, (9) a number of new instruments for the cold beams including two new SANS instruments, and (10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule.

Selby, Douglas L [ORNL; Jones, Amy [ORNL; Crow, Lowell [ORNL

2012-01-01T23:59:59.000Z

213

12 GeV Upgrade | Jefferson Lab  

NLE Websites -- All DOE Office Websites

Science Science A Schematic of the 12 GeV Upgrade The 12 GeV Upgrade will greatly expand the research capabilities of Jefferson Lab, adding a fourth experimental hall, upgrading existing halls and doubling the power of the lab's accelerator. A D D I T I O N A L L I N K S: 12 GeV Home Public Interest Scientific Opportunities Hall D Status Updates Contacts Three-Year Accelerator Schedule 2014 - 2016 top-right bottom-left-corner bottom-right-corner 12 GeV Upgrade Physicists at Jefferson Lab are trying to find answers to some of nature's most perplexing questions about the universe by exploring the nucleus of the atom. Their goal is to answer such questions as: "What is the universe made of?" and "What holds everyday matter together?" In their search for answers, physicists smash electrons into atoms using

214

Steam-system upgrades | Open Energy Information  

Open Energy Info (EERE)

Linked Data Page Edit History Share this page on Facebook icon Twitter icon Steam-system upgrades Jump to: navigation, search TODO: Add description List of Steam-system...

215

Upgrading of light Fischer-Tropsch products  

SciTech Connect

The upgrading of Fischer-Tropsch (F-T) light ends was studied at UOP in a program sponsored by the Pittsburgh Energy Technology Center of the US Department of Energy. The goal of the program was to increase the overall yield of marketable transportation fuels from the F-T upgrading complex by focusing on liquefied petroleum gas (LPG) and naphtha. An overview of the entire light-ends program is presented in this paper. Although this contract is specifically concerned with light products (C{sub 3}-C{sub 11}), a separate DOE-sponsored program at UOP investigated the characterization and upgrading of the heavy end of the F-T product spectrum: F-T wax. An economic analysis of the light and heavy ends upgrading was performed to evaluate the conversion of F-T products to marketable transportation fuels. 9 refs., 7 figs., 9 tabs.

Shah, P.P.

1990-11-30T23:59:59.000Z

216

Pricing and Market Segmentation with Software Upgrades.  

E-Print Network (OSTI)

it selects and the number of customers attracted by theseincrease in the number of upgrading customers. Thus, p ? = ?is because: (1) the number of total customers is F c (?) in

Bala, R.; Carr, S. C.

2005-01-01T23:59:59.000Z

217

User and Performance Impacts from Franklin Upgrades  

E-Print Network (OSTI)

J. Lebens. Post- Mortem of the NERSC Franklin XT4 Upgrade toCray User Group Meeting NERSC Franklin Home Page: http://planning from both Cray and NERSC, service interruptions

He, Yun Helen

2009-01-01T23:59:59.000Z

218

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment  

E-Print Network (OSTI)

COMMISSIONING RESULTS OF THE UPGRADED NEUTRALIZED DRIFTexperiments. We report on commissioning results of the

Lidia, S.M.

2009-01-01T23:59:59.000Z

219

Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in  

NLE Websites -- All DOE Office Websites (Extended Search)

Honeymoons Honeymoons Lead to Upgrades in Western Vermont to someone by E-mail Share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Facebook Tweet about Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Twitter Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Google Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Delicious Rank Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Digg Find More places to share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on AddThis.com... Better Buildings Residential Network Progress

220

The Advanced Light Source Upgrade  

SciTech Connect

The ALS, a third-generation synchrotron light source at Berkeley Lab, has been operating for almost a decade and is generating forefront science by exploiting the high brightness of a third-generation source in three areas: (1) high resolving power for spectroscopy; (2) high spatial resolution for microscopy and spectromicroscopy; and (3) high coherence for experiments such as speckle. However, the ALS was one of the first third-generation machines to be designed, and accelerator and insertion-device technology have significantly changed since its conception. As a result, its performance will inevitably be outstripped by newer, more advanced sources. To remain competitive and then set a new standard, the performance of the ALS, in particular its brightness, must be enhanced. Substantial improvements in brightness and current have always been feasible in principle, but they incur the penalty of a much reduced lifetime, which is totally unacceptable to our users. Significant brightness improvements can be realized in the core soft x-ray region by going to top-off operation, where injection would be quasi-continuous and the lifetime objections disappear. In top-off mode with higher average current, a reduced vertical emittance and beta function, and small-gap permanent-magnet or superconducting insertion devices, one to two orders of magnitude improvement in brightness can be had in the soft x-ray range. These improvements also extend the high energy range of the undulator radiation beyond the current limit of 2000 eV. Descriptions of the upgrade and the important new science achievable are presented.

Chemla, Daniel S.; Feinberg, Benjamin; Hussain, Zahid; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

2003-11-04T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Line-of-Credit to Term Loans (Connecticut)  

Energy.gov (U.S. Department of Energy (DOE))

CDA’s Line-of-Credit to Term Loans good for one year for capital expenditures, converting to a fully amortizing term loan. Funds may be used for building expansion, equipment, or IT upgrades.

222

NEPA CX Determination SS-SC-11-01 for SSRL Seismic Upgrade Phase 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 for SSRL Seismic Upgrade Phase 2 1 for SSRL Seismic Upgrade Phase 2 National Environmental Policy Act (NEPA) Categorical Exclusion (CX) Determination A. SSO NEPA Control #: SS-SC-11-01 B. Brief Description of Proposed Action: The Stanford Synchrotron Radiation Lightsource (SSRL) is proposing to upgrade a portion of the existing Stanford Positron-Electron Asymmetric Ring (SPEAR) to meet seismic standards. The proposed work includes : 1) the replacement of concrete roof blocks, placement of footings and new concrete walls, and installation of seismic connections at the old Beam Line 4; 2) the replacement of existing concrete roof blocks with precast roof blocks, placement of new footings, and installation of seismic anchors and connections at the northeast section of the

223

Hardware and Software Upgrades to DIII-D Main Computer Control System  

Science Conference Proceedings (OSTI)

The complexities of monitoring and controlling the various DIII-D tokamak systems have always required the aid of high-speed computer resources. Because of recent improvements in computing technology, DIII-D has upgraded both hardware and software for the central DIII-D control system. This system is responsible for coordination of all main DIII-D subsystems during a plasma discharge. The replacement of antiquated older hardware has increased reliability and reduced costs both in the initial procurement and eventual maintenance of the system. As expected, upgrading the corresponding computer software has become the more time consuming and expensive part of this upgrade. During this redesign, the main issues focused on making the most of existing in-house codes, speed with which the new system could be brought on-line, the ability to add new features/enhancements, ease of integration with all DIII-D systems and future portability/upgrades. The resulting system has become a template by which other DIII-D systems can follow during similar upgrade paths; in particular DIII-D's main data acquisition system and neutral beam injection (NBI).

Piglowski, D. A.; Penaflor, B.G.; McHarg, JR., B.B.; Greene, K.L.; Coon, R.M.; Phillips, J.C.

2002-09-01T23:59:59.000Z

224

Climate balance of biogas upgrading systems  

SciTech Connect

One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

2010-01-15T23:59:59.000Z

225

A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE)  

NLE Websites -- All DOE Office Websites (Extended Search)

Tale of Two Cities: Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities Greensburg, Kansas, was like any rural community in America until a massive tornado leveled much of the town on May 4, 2007. Key leaders in Greensburg and Kansas made a crucial decision not just to rebuild, but to remake the town as a model sustainable community. To help achieve that goal, technical experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) arrived in Greensburg in June 2007. For three years, the experts worked with city leaders, business owners, residents, and other state, federal, and local agencies to identify ways to incorporate energy efficiency and renew- able energy technologies into the town's rebuilding efforts.

226

A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tale of Two Cities: Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities Greensburg, Kansas, was like any rural community in America until a massive tornado leveled much of the town on May 4, 2007. Key leaders in Greensburg and Kansas made a crucial decision not just to rebuild, but to remake the town as a model sustainable community. To help achieve that goal, technical experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) arrived in Greensburg in June 2007. For three years, the experts worked with city leaders, business owners, residents, and other state, federal, and local agencies to identify ways to incorporate energy efficiency and renew- able energy technologies into the town's rebuilding efforts.

227

HERA Upgrade Project | Superconducting Magnet Division  

NLE Websites -- All DOE Office Websites (Extended Search)

HERA Upgrade Project HERA Upgrade Project As part of the HERA luminosity upgrade, 6 superconducting Interaction Region quadrupoles were delivered, accepted, and are in service. These 6 layer magnets were designed to include the main quadrupole focus, a skew quad, a normal and skew dipole, and a final sextupole layer. Because of the physical space constraints imposed by the existing detector region components, the DESY magnets were of necessity designed to be very compact. In addition, they are also are required to operate within the solenoidal detector fields at the collision points, so all construction materials had to be non magnetic. Two types of DESY magnets were fabricated. The first, designated as G0, was a two meter long, constant radius magnet. The second, designated GG, is a

228

Instrumentation upgrades for the Macromolecular Crystallography beamlines  

NLE Websites -- All DOE Office Websites (Extended Search)

Instrumentation upgrades for the Macromolecular Crystallography beamlines Instrumentation upgrades for the Macromolecular Crystallography beamlines of the Swiss Light Source Monday, October 29, 2012 - 2:00am SSRL, Bldg. 137, Rm. 322 Martin Fuchs, MX Group, Swiss Light Source; Paul Scherrer Institute (Villigen, Switzerland) A new unified diffractometer - the D3 - has been developed for the three MX beamlines. The first of the instruments is in general user operation at beamline X10SA since April 2012. The varied demands from both challenging academic research projects as well as high throughput industrial applications on today's macromolecular crystallography beamlines drive developments to both endstations and beamline optics. Recent instrumentation upgrades to the macromolecular crystallography (MX) beamlines of the Swiss Light Source therefore aimed to

229

Energy Upgrade of the Siam Photon Source  

SciTech Connect

The energy upgrade of the storage ring is part of the plans to develop x-ray production capability of the Siam Photon Source. Simulations have been carried out. The bending magnet power supply has been replaced. Energy of the injected 1 GeV beam from the injector is then ramped up 20% in the storage ring. Studies for modification of bending magnet poles have been done to evaluate possibility of further increasing the beam energy to 1.4 GeV in the future. Studies of the energy upgrade plan and details of energy ramping process, together with beam measurements are presented.

Rugmai, S.; Rujirawat, S. [National Synchrotron Research Center, P.O. Box 93, Nakhon Ratchasima, 30000 (Thailand); School of Physics, Suranaree University of Technology, 111 University Avenue, Muang Distrct, Nakhon Ratchasima, 30000 (Thailand); Hoyes, G. G.; Prawanta, S.; Kwankasem, A.; Siriwattanapitoon, S.; Suradet, N.; Pimol, P.; Junthong, N.; Boonsuya, S.; Janpuang, P.; Prawatsri, P.; Klysubun, P. [National Synchrotron Research Center, P.O. Box 93, Nakhon Ratchasima, 30000 (Thailand)

2007-01-19T23:59:59.000Z

230

Upgrading of light Fischer-Tropsch products  

SciTech Connect

Work during this quarter concentrated on Task 4 of the study. The objective of this task is to evaluate the application of the UOP/BP Cyclar* process to the upgrading of Fischer-Tropsch LPG products into aromatics. Results from pilot plant studies were translated into commercial yield estimates as described in Quarterly Report No. 7. This quarterly report documents an economic evaluation of the Cyclar process for converting LPG into aromatics in a Fischer-Tropsch upgrading complex. 1 ref., 11 figs., 9 tabs.

1989-07-11T23:59:59.000Z

231

Energy Upgrades to Save Small Arizona Town Big Money | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Upgrades to Save Small Arizona Town Big Money Energy Upgrades to Save Small Arizona Town Big Money July 19, 2010 - 1:00pm Addthis An aerial shot of Oro Valley, Ariz.'s town...

232

Missouri Water Treatment Plant Upgraded | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Water Treatment Plant Upgraded Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water Treatment Plant are almost 30...

233

How to Save Energy, Money with Home Energy Upgrades | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

How to Save Energy, Money with Home Energy Upgrades How to Save Energy, Money with Home Energy Upgrades November 1, 2013 - 4:38pm Addthis Tammara Thayer thanks Steve Lemaire (left)...

234

Better Buildings Neighborhood Program: Energy Upgrade California Drives  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Upgrade Energy Upgrade California Drives Demand From Behind the Wheel to someone by E-mail Share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Facebook Tweet about Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Twitter Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Google Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Delicious Rank Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Digg Find More places to share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on

235

EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in...

236

NSTX Upgrade Armor Plate Backing Plate  

E-Print Network (OSTI)

NSTX Upgrade Armor Plate Backing Plate NSTXU-CALC-24-02-00 Rev 0 February 17, 2011 Prepared By # NSTXU_CALC-24-02-00 Revision # 00 WP #: 1508 (ENG-032) Purpose of Calculation: 1.) To qualify the Armor backing plate calculation 2.) Build and evaluate a Finite Element Model for The Armor Eddy Current

Princeton Plasma Physics Laboratory

237

CMS: Present status, limitations, and upgrade plans  

SciTech Connect

An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

Cheung, H.W.K.; /Fermilab

2011-09-01T23:59:59.000Z

238

Upgrade of a Scara robot using Orocos  

Science Conference Proceedings (OSTI)

This paper presents a bottom-up approach that permits the integration of new devices and functionalities into a robotic cell. Although there are currently notable efforts from the scientific community toward this goal, the initiative presented here combines ... Keywords: Orocos, RTAI, free software, real time systems, robot design and architecture, robot upgrade

Dalton Matsuo Tavares; Rafael Vidal Aroca; Glauco Augusto de Paula Caurin

2007-08-01T23:59:59.000Z

239

Preparation for upgrading western subbituminous coal  

SciTech Connect

The objective of this project was to establish the physical and chemical characteristics of western coal and determine the best preparation technologies for upgrading this resource. Western coal was characterized as an abundant, easily mineable, clean, low-sulfur coal with low heating value, high moisture, susceptibility to spontaneous ignition, and considerable transit distances from major markets. Project support was provided by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The research was conducted by the Western Research Institute, (WRI) in Laramie, Wyoming. The project scope of work required the completion of four tasks: (1) project planning, (2) literature searches and verbal contacts with consumers and producers of western coal, (3) selection of the best technologies to upgrade western coal, and (4) identification of research needed to develop the best technologies for upgrading western coals. The results of this research suggest that thermal drying is the best technology for upgrading western coals. There is a significant need for further research in areas involving physical and chemical stabilization of the dried coal product. Excessive particle-size degradation and resulting dustiness, moisture reabsorption, and high susceptibility to spontaneous combustion are key areas requiring further research. Improved testing methods for the determination of equilibrium moisture and susceptibility to spontaneous ignition under various ambient conditions are recommended.

Grimes, R.W.; Cha, C.Y.; Sheesley, D.C.

1990-11-01T23:59:59.000Z

240

MR LLRF VXI upgrade beam study period  

Science Conference Proceedings (OSTI)

AD/RFI/LLRF group personnel performed several studies with the MR LLRF VXI upgrade system during the evening of 7/29/95. The study period lasted about 4 hours. The MR operating conditions were a mixture of $29 and $2B cycles, with beam injected only on the $29. The author believes the $2B cycles were present for reasons unrelated to the study. The basic study period goal was to test the initial VXI version of MR LLRF finite state machine (FSM) execution. This goal represents what has been called MR LLRF VXI Upgrade Implementation Stage No.2 throughout presentations and documentation on the upgrade project. The test includes control of MR LLRF NIM hardware, the MR RF cavities, and beam via XVI TTL FSM outputs. Numerous MR LLRF VXI system objects, or components, must work together correctly for a successful test. Very briefly, the required objects include VXI Front End hardware, the ACNET/Front End interface code, and the VXI/NIM Interface chassis (the chassis solves VXI-CAMAC-NIM RF and FSM output connectivity and development problems). Though this initial FSM does not yet fully support Upgrade Implementation Stage 2 functionality, all code and hardware for the following basic functionality is tested.

Mesiner, K.; /Fermilab

1995-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

The BABAR Detector: Upgrades, Operation and Performance  

E-Print Network (OSTI)

The BABAR detector operated successfully at the PEP-II asymmetric e+e- collider at the SLAC National Accelerator Laboratory from 1999 to 2008. This report covers upgrades, operation, and performance of the collider and the detector systems, as well as the trigger, online and offline computing, and aspects of event reconstruction since the beginning of data taking.

The BABAR Collaboration

2013-05-15T23:59:59.000Z

242

UPGRADES TO Monteburns, VERSION 3.0  

SciTech Connect

Monteburns VERSION 3.0 is an upgrade of the existing Monteburns code available through RSICC. The new version includes modern programming style, increased parallel computing, more accurate capture gamma calculations and an automated input generator. This capability was demonstrated through a small PWR core simulation.

Galloway, Jack D [Los Alamos National Laboratory; Trellue, Holly R [Los Alamos National Laboratory

2012-06-22T23:59:59.000Z

243

Microsoft Word - CX-Olympia-SouthElma_upgrades_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2011 0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: The project consists of upgrades to the Olympia-South Elma No. 1, 115-kV transmission line from structure 21/10 to Elma Substation. Budget Information: Work Order #251089 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not effect the environment beyond the previously developed facility area including but not limited to....tower modifications, changing insulators, and replacement of poles ...conductors...and crossarms. Location: The project is located in Grays Harbor County, Washington along Bonneville Power

244

Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)  

Science Conference Proceedings (OSTI)

This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

Not Available

2011-08-01T23:59:59.000Z

245

Financing Energy Upgrades for K-12 School Districts  

NLE Websites -- All DOE Office Websites (Extended Search)

Financing Energy Upgrades for K-12 School Districts Financing Energy Upgrades for K-12 School Districts Page 2 Table of Contents Introduction................................................................................................................................................................................................................... 4 What This Guide Covers .................................................................................................................................................................................. 6 Chapter 1: Principles of Financing Energy Upgrades for Schools .................................................................................................. 7 Principle 1. Start with Clear Project Objectives.......................................................................................................................................... 7

246

New Applications of Transformerless Voltage Sourced Converters (VSC): Phase Displacement for Upgrading Rights-of-Way  

Science Conference Proceedings (OSTI)

New overhead transmission lines, steady expansion of electric power systems, and reallocation of generation all make it increasingly important to maximize the use of existing rights-of-way (ROWs) in order to increase power transfer capability. It is extremely difficult and costly, however, to remove critical circuits from service long enough to reconductor or replace old circuits with new higher capacity circuits using the same ROW. This report describes new means to allow either type of upgrade ...

2013-06-28T23:59:59.000Z

247

Energy Star Building Upgrade Value Calculator | Open Energy Information  

Open Energy Info (EERE)

Energy Star Building Upgrade Value Calculator Energy Star Building Upgrade Value Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Star Building Upgrade Value Calculator (for Office Properties) Agency/Company /Organization: ENERGY STAR Phase: "Evaluate Options and Determine Feasibility" is not in the list of possible values (Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes, Evaluate Effectiveness and Revise as Needed) for this property. User Interface: Spreadsheet Website: www.energystar.gov/index.cfm?c=comm_real_estate.building_upgrade_value The Building Upgrade Value Calculator allows practitioners to analyze the

248

Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE)  

NLE Websites -- All DOE Office Websites (Extended Search)

On May 4, 2007, a massive tornado destroyed or severely damaged 95% On May 4, 2007, a massive tornado destroyed or severely damaged 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) worked with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. The town showcases energy-saving best practices that can be replicated not only in other communi- ties recovering from disaster, but any location focused on sustainability. The Town of Greensburg Founded in 1886, Greensburg had a population of approximately 1,400 people prior to the tornado, and relied on the agricultural, oil, and gas industries to

249

Greensburg, Kansas: Building a Model Green Community, How Would You Rebuild a Town - Green? April 2009 (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GO-102009-2829 * April 2009 GO-102009-2829 * April 2009 Cover photo courtesy of Lynn Billman, NREL Printed with a renewable source ink on paper containing at least 50% wastepaper, including 10% postconsumer waste. For Additional Information, Please Contact: Energy Efficiency and Renewable Energy Information Center 1-877-EERE-INF (1-877-337-3463) www.eere.energy.gov Prepared by NREL, a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. How would you rebuild a town - green? Greensburg, Kansas: Building a Model Green Community Energy Efficiency & Renewable Energy Case Study Database

250

Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

On May 4, 2007, a massive tornado destroyed or severely damaged 95% On May 4, 2007, a massive tornado destroyed or severely damaged 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) worked with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. The town showcases energy-saving best practices that can be replicated not only in other communi- ties recovering from disaster, but any location focused on sustainability. The Town of Greensburg Founded in 1886, Greensburg had a population of approximately 1,400 people prior to the tornado, and relied on the agricultural, oil, and gas industries to

251

ATU Advanced Technology Upgrading Ltd | Open Energy Information  

Open Energy Info (EERE)

ATU Advanced Technology Upgrading Ltd ATU Advanced Technology Upgrading Ltd Jump to: navigation, search Name ATU (Advanced Technology Upgrading) Ltd Place Israel Product Focused on development of rechargeable magnesium battery. References ATU (Advanced Technology Upgrading) Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. ATU (Advanced Technology Upgrading) Ltd is a company located in Israel . References ↑ "ATU (Advanced Technology Upgrading) Ltd" Retrieved from "http://en.openei.org/w/index.php?title=ATU_Advanced_Technology_Upgrading_Ltd&oldid=342420" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version

252

An Upgrade for the Advanced Light Source  

SciTech Connect

One of the first third-generation synchrotron light sources, the ALS, has been operating for almost a decade at Berkeley Lab, where experimenters have been exploiting its high brightness for forefront science. However, accelerator and insertion-device technology have significantly changed since the ALS was designed. As a result, the performance of the ALS is in danger of being eclipsed by that of newer, more advanced sources. The ALS upgrade that we are planning includes full-energy, top-off injection with higher storage-ring current and the replacement of five first-generation insertion devices with nine state-of-the art insertion devices and four new application-specific beamlines now being identified in a strategic planning process. The upgrade will help keep the ALS at the forefront of soft x-ray synchrotron light sources for the next two decades.

Chemla, Daniel S.; Feinberg, Benedict; Hussain, Zahid; Kirz,Janos; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson,Arthur L.; Smith, Neville V.

2004-08-05T23:59:59.000Z

253

JEFFERSON LAB 12 GEV CEBAF UPGRADE  

Science Conference Proceedings (OSTI)

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at approx6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

Rode, C. H. [Thomas Jefferson National Accelerator Facility, Newport News, Virginia, 23606 (United States)

2010-04-09T23:59:59.000Z

254

Idaho Chemical Processing Plant product denitrator upgrade  

SciTech Connect

The uranium product denitrator at the Idaho Chemical Processing Plant has had serious operating problems since 1970, including inadequate contamintion control, fluidized bed caking, frequent bed heater failure, product overflow plugging, and poor feed control. These problems were minimized through selective redesign and upgrade of the process equipment as part of a process upgrade program completed in March 1981. Following startup and testing of the rebuilt product denitrator, 1044 kg of enriched uranium was processed in three weeks while demonstrating greater reliability, ease of operation, and improved contamination control. To maximize personnel safety in the future, the denitrator vessel should be made critically safe by geometry and process instrumentation isolated from the process for semi-remote operation.

Rindfleisch, J.A.; Durst, P.C.; Dahl, C.A.; Casterline, C.E.; Petig, A.V.

1982-05-01T23:59:59.000Z

255

CHALLENGES FOR THE SNS RING ENERGY UPGRADE  

Science Conference Proceedings (OSTI)

The Oak Ridge Spallation Neutron Source accumulator ring presently operates at a beam power of about 1 MW with a beam energy of about 910 MeV. A power upgrade is planned to increase the beam energy to 1.3 GeV. For the accumulator ring this mostly involves modifications to the injection and extraction sections. A variety of modifications to the existing injection section were necessary to achieve 1 MW, and the tools developed and the lessons learned from this work are now being applied to the design of the new injection section. This paper will discuss the tools and the lessons learned, and also present the design and status of the upgrades to the accumulator ring.

Plum, Michael A [ORNL; Gorlov, Timofey V [ORNL; Holmes, Jeffrey A [ORNL; Hunter, W Ted [ORNL; Roseberry, Jr., R Tom [ORNL; Wang, Jian-Guang [ORNL

2012-01-01T23:59:59.000Z

256

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) 2013 Annual Planning Summary for the Southwestern Area Power Administration

257

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Innovative Technology Improves Upgrading Process for Unconventional Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology.

258

County Aims to Save with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

County Aims to Save with Upgrades County Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

259

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technology Improves Upgrading Process for Unconventional Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil

260

Energy Efficiency Upgrades: Benefiting Homeowners and the Environment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrades: Benefiting Homeowners and the Upgrades: Benefiting Homeowners and the Environment Energy Efficiency Upgrades: Benefiting Homeowners and the Environment May 10, 2013 - 4:37pm Addthis Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs Looking for ways to save energy? Learn how to do a DIY home energy audit to help you identify and prioritize some energy efficiency upgrades. Check out Energy Saver for tips and advice on ways to save energy and money. When Margie Garmey and her partner bought their newly constructed two-story

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

County Aims to Save with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Aims to Save with Upgrades Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

262

Upgrade of the ALICE Inner Tracking System  

E-Print Network (OSTI)

The Inner Tracking System (ITS) is the key ALICE detector for the study of heavy flavour production at LHC. Heavy flavor can be studied via the identification of short-lived hadrons containing heavy quarks which have a mean proper decay length in the order of 100-300 $\\mu$m. To accomplish this task, the ITS is composed of six cylindrical layers of silicon detectors (two pixel, two drift and two strip) with a radial coverage from 3.9 to 43 cm and a material budget of 1.1% X0 per layer. %In particular, the properties of the two innermost layers define the ITS performance in measuring the displaced vertex of such short-lived particles. In order to enhance the ALICE physics capabilities, and, in particular, the tracking performance for heavy-flavour detection, the possibility of an ITS upgrade has been studied in great detail. It will make use of the spectacular progress made in the field of imaging sensors over the last ten years as well as the possibility to install a smaller radius beampipe. The upgraded detector will have greatly improved features in terms of: the impact parameter resolution, standalone tracking efficiency at low $p_{t}$, momentum resolution and readout capabilities. The Conceptual Design Report, which covers the design and performance requirements, the upgrade options, as well as the necessary R&D efforts, was made public in September 2012. An intensive R&D program has been launched to review the different technological options under consideration. The new detector should be ready to be installed during the long LHC shutdown period scheduled in 2017-2018.

Stefan Rossegger

2012-11-22T23:59:59.000Z

263

Emergency Diesel Generator Digital Control System Upgrade Requirements  

Science Conference Proceedings (OSTI)

This interim report documents the development of system requirements for a digital control system upgrade to the station emergency diesel generators (EDGs). Operators of nuclear power plants (NPPs) must be able to replace and upgrade equipment in a cost-effective manner while continuing to meet safety and reliability requirements and controlling modification costs. Upgrades to plant equipment—especially instrumentation and control (I&C) systems—typically involve replacement of analog ...

2013-12-18T23:59:59.000Z

264

Methods and apparatuses for preparing upgraded pyrolysis oil  

SciTech Connect

Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

2013-10-01T23:59:59.000Z

265

Beam Physics for the 12 GeV CEBAF Upgrade Project  

SciTech Connect

Beam physics aspects of the 12 GeV Upgrade of CEBAF are presented. The CEBAF Upgrade to 12 GeV is achieved via 5.5 recirculations through the linacs, and the installation of 10 new high-gradient cryomodules. A new experimental hall, Hall D, is envisioned at the end of North Linac. Simulation results for straight-through and recirculated injectors are summarized and compared. Beam transport designs are discussed and evaluated with respect to matching and beam breakup (BBU) optimization. Effects of synchrotron radiation excitation on the beam properties are calculated. BBU simulations and derived specifications for the damping of higher order modes of the new 7-cell cavities are presented. The energies that provide longitudinal polarization in multiple experimental halls simultaneously are calculated. Finally, a detailed optics design for the Hall D transport line has been obtained.

L. Merminga; J. F. Benesch; S.A. Bogacz; Y.-C. Chao; A. Freyberger; J.M. Grames; L. Harwood; R. Kazimi; G.A. Krafft; M. Spata; M. Tiefenback; M. Wiseman; B.C. Yunn; Y. Zhang

2005-05-16T23:59:59.000Z

266

Economic Options for Upgrading Waste Heat  

E-Print Network (OSTI)

There are at least six major types of equipment that upgrade waste heat: (1) thermocompressor; (2) electric drive compressor heat pump; (3) absorption heat pump; (4) high temperature heat powered compressor heat pump; (5) reverse absorption heat pump; and (6) waste heat driven compressor heat pump. Some of these are not widely known, and there has been a tendency to ascribe the characteristics and limitations of the most well-known member to all members of the group. This paper demonstrates the wide variation that actually exists between the different options, and highlights the considerations necessary to ensure the most economic choice for a particular application.

Erickson, D. C.

1983-01-01T23:59:59.000Z

267

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

DOE Green Energy (OSTI)

This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

Talmadge, M.; Biddy, M.; Dutta, A.; Jones, S.; Meyer, A.

2013-03-01T23:59:59.000Z

268

The value of steam turbine upgrades  

Science Conference Proceedings (OSTI)

Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

Potter, K.; Olear, D.; [General Physics Corp. (United States)

2005-11-01T23:59:59.000Z

269

Upgrade Your Refinery for Energy Conservation  

E-Print Network (OSTI)

Upgrading existing refineries for efficient energy utilization imposes strict restraints upon design engineers. Present and future production requirements must be defined. Reliable operating data must be obtained from historical records and test runs to accurately define actual performance of each piece of equipment. A complete simulation model of the facility is developed and tested. Future operations are evaluated using the model to define heat and material balance requirements for all projected operations. Energy conservation projects are evaluated with the model to define energy savings over the life of each project. A discounted cash flow analysis is formulated and an optimum set of projects yielding maximum rates of return are selected for implementation.

Johnnie, D. H., Jr.; Klooster, H. J.

1983-01-01T23:59:59.000Z

270

N reactor safety upgrades final status report  

Science Conference Proceedings (OSTI)

This document describes the requirements, objectives, work completed, and issues resolved for all safety upgrades recommended by the various expert panels (e.g., Roddis), National Academy of Sciences (NAS), and Westinghouse Independent Safety Appraisal (WISA) team. This report reflects the status of the recommendations at the time of publication, while the reactor is being placed in cold standby. Each recommendation required a resolution, a closure process if closed, and a punchlist reference if open and required for restart. These recommendations are maintained on databases that were updated periodically as work was completed or punchlisted. The databases and files are to be retained with the N Reactor Standby files.

Foreman, S.K.; Rainey, T.E.; Erpenbeck, E.G.

1990-02-01T23:59:59.000Z

271

List of Steam-system upgrades Incentives | Open Energy Information  

Open Energy Info (EERE)

upgrades Incentives upgrades Incentives Jump to: navigation, search The following contains the list of 100 Steam-system upgrades Incentives. CSV (rows 1 - 100) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active AlabamaSAVES Revolving Loan Program (Alabama) State Loan Program Alabama Commercial Industrial Institutional Building Insulation Doors Energy Mgmt. Systems/Building Controls Lighting Lighting Controls/Sensors Steam-system upgrades Water Heaters Windows Biodiesel Biomass CHP/Cogeneration Ethanol Fuel Cells using Renewable Fuels Geothermal Electric Hydroelectric energy Landfill Gas Photovoltaics Renewable Fuels Solar Water Heat Commercial Refrigeration Equipment Natural Gas Yes Ameren Missouri (Gas) - Business Energy Efficiency Program (Missouri) Utility Rebate Program Missouri Commercial

272

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: AstraZeneca - Newark This profiles explains how Astrazeneca's Newark...

273

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: Allergan - Westport This profiles explains how Allergan's Westport facility...

274

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: Boeing Philadelphia This profiles explains how Beoing's Philadelphia plant...

275

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: Cargill Krefeld This profiles explains how Cargill's Krefeld mill saved...

276

Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy...  

NLE Websites -- All DOE Office Websites (Extended Search)

State and local government resources Profiles in Energy Efficiency Boiler Upgrades Save Money & Energy: GM Marion & Orion This profiles explains how GM's Marion & Orion facilities...

277

EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

278

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Sites Power Marketing Administration Other Agencies You are here Home EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho...

279

Income Tax Deduction for Energy Efficiency Upgrades (Idaho) ...  

Open Energy Info (EERE)

Facebook icon Twitter icon Income Tax Deduction for Energy Efficiency Upgrades (Idaho) This is the approved revision of this page, as well as being the most recent. Jump...

280

Energy Upgrade Program Revitalizing Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Act. The program tapped nonprofit Energy Trust of Oregon to provide free energy audits for the participating businesses. Two-year payback When the energy upgrades are...

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

SRI2013 | Workshop 3 - Facility Upgrades and High ...  

Science Conference Proceedings (OSTI)

... 11:45 — 12:15, Christoph Steier (LBNL) DL-ALS, a potential soft x-ray, diffraction-limited upgrade of the Advanced Light Source. ...

282

Energy Upgrades Pay Off for Taxpayers and Feds  

Science Conference Proceedings (OSTI)

... savings from the energy upgrades, based on 2007 energy prices, came to ... software to figure in a three percent annual energy price escalation rate. ...

2011-07-19T23:59:59.000Z

283

Community based outreach strategies in residential energy upgrade programs  

E-Print Network (OSTI)

Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

McEwen, Brendan (Brendan Carl Francis)

2012-01-01T23:59:59.000Z

284

ALS control system IP I/O module upgrade  

E-Print Network (OSTI)

the Fast Orbit Feedback at the ALS, Proceedings of PAC 2003,ALS Control System IP I/O Module Upgrade* J. M . Weber, M .

Weber, Jonah M.; Chin, Michael

2004-01-01T23:59:59.000Z

285

NERSC's Franklin Supercomputer Upgraded to Double Its Scientific...  

NLE Websites -- All DOE Office Websites (Extended Search)

system. The Department of Energy's (DOE) National Energy Research Scientific Computing (NERSC) Center has officially accepted a series of upgrades to its Cray XT4 supercomputer,...

286

ENERGY STAR Building Upgrade Manual Chapter 11: Supermarkets...  

NLE Websites -- All DOE Office Websites (Extended Search)

care resources Small business resources State and local government resources ENERGY STAR Building Upgrade Manual Chapter 11: Supermarkets and Grocery Stores The Building...

287

ENERGY STAR Building Upgrade Manual Chapter 1: Introduction ...  

NLE Websites -- All DOE Office Websites (Extended Search)

STAR Building Upgrade Manual Chapter 1: Introduction Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings...

288

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the...

289

ENERGY STAR Building Upgrade Manual Chapter 2: Benchmarking ...  

NLE Websites -- All DOE Office Websites (Extended Search)

efficiency upgrades presented in an easy-to-understand framework designed especially for ENERGY STAR partners. This 12-page chapter defines benchmarking, what successful...

290

Sandia upgrades hardware for NNSA training course | National...  

National Nuclear Security Administration (NNSA)

upgrades hardware for NNSA training course | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy...

291

Ribbon cutting marks chemistry laboratory upgrades at Northern...  

NLE Websites -- All DOE Office Websites (Extended Search)

November 2013 Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Community Connections: Our link to Northern New Mexico Communities Latest...

292

Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades...  

NLE Websites -- All DOE Office Websites (Extended Search)

Spotlight on Austin, Texas: Best Offer Ever Produces Upgrades in Record Time The Better Buildings Neighborhood Program is part of the national Better Buildings Initiative led by...

293

HIGH INTENSITY PERFORMANCE AND UPGRADES AT THE BROOKHAVEN AGS  

SciTech Connect

Fig. 1 shows the present layout of the AGS-RHIC accelerator complex. The high intensity proton beam of the AGS is used both for the slow-extracted-beam (SEB) area with many target station to produce secondary beams and the fast-extracted-beam (FEB) line used for the production of muons for the g-2 experiment and for high intensity target testing for the spallation neutron sources and muon production targets for the muon collider. The same FEB line will also be used for the transfer of beam to RHIC. The proton beam intensity in the AGS has increased steadily over the 35 year existence of the AGS, but the most dramatic increase occurred over the last couple of years with the addition of the new AGS Booster[1]. In Fig. 2 the history of the AGS intensity improvements is shown and the major upgrades are indicated. The AGS Booster has one quarter the circumference of the AGS and therefore allows four Booster beam pulses to be stacked in the AGS at an injection energy of 1.5--1.9 GeV. At this increased energy, space charge forces are much reduced and this in turn allows for the dramatic increase in the AGS beam intensity. The 200 MeV LINAC is being used both for the injection into the Booster as well as an isotope production facility. A recent upgrade of the LINAC rf system made it possible to operated at an average H{sup {minus}} current of 150 {micro}A and a maximum of 12 x 10{sup 13} H{sup {minus}} per 500 {micro}s LINAC pulse for the isotope production target. Typical beam currents during the 500 {micro}s pulse are about 80 mA at the source, 60 mA after the 750 keV RFQ, 38 mA after the first LINAC tank (10 MeV), and 37 mA at end of the LINAC at 200 MeV. The normalized beam emittance is about 2 {pi} mm mrad for 95% of the beam and the beam energy spread is about {+-}1.2 MeV. A magnetic fast chopper installed at 750 keV allows the shaping of the beam injected into the Booster to avoid excessive beam loss.

ROSER,T.

1998-05-04T23:59:59.000Z

294

ATLAS Upgrade Instrumentation in the US  

E-Print Network (OSTI)

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leading role.

Gustaaf Brooijmans; Hal Evans; Abe Seiden

2013-07-22T23:59:59.000Z

295

Gulf Shale Oil Upgrading Process technology  

SciTech Connect

A description of the Gulf Shale Oil Hydrotreating Process, which is designed for upgrading full range shale oil to premium quality synthetic crude, is presented. The process consists of two sections: a low severity pretreating section which stabilizes the raw oil, removes iron, arsenic, trace metals and particulates, and sulfur; and a twostage, high severity hydrotreating section which completes the upgrading. The second section hydrotreats the bulk oil to a specified nitrogen content, allowing for a quality FCC feedstock in the 650F+ (343C+) residue. The main reactor effluent is flashed with subsequent hydrotreating of the flash vapor oil to achieve a low nitrogen level in the naphtha and middle distillate. The benefit of this flash configuration is hydrogen addition selectivity which maximizes syncrude quality while minimizing overall hydrogen consumption; this selectivity relationship is detailed. Finally, the product quality of the syncrudes produced with the Gulf Shale Oil Hydrotreating Process using shale oils derived from three different retort technologies and for Western and Eastern shales are discussed.

Jones, W.; Antezana, F.J.; Cugini, A.V.; Lyzinski, D.; Miller, J.B.

1984-04-01T23:59:59.000Z

296

Help Line  

NLE Websites -- All DOE Office Websites (Extended Search)

Help Line Help Line Ombuds Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns and want advice or referral while preserving confidentiality and anonymity. Callers may remain anonymous and the Help Line does not have caller ID or other methods of identifying callers. The Help Line maintains the same level of confidentiality and neutrality as the other Ombuds services. The Ombuds Help Line is not for reporting emergencies or officially

297

BIG Energy Upgrade: Procurement and Supply Chain report  

E-Print Network (OSTI)

BIG Energy Upgrade: Procurement and Supply Chain report ­ Green Deal and Energy Efficiency. Cover Image © Yorkshire Energy Services #12;BIG Energy Upgrade: Procurement and Supply Chain report ­ Green Deal and Energy Efficiency Retrofitting Supply Chains Delivery Professor S.C. Lenny Koh Dr Andrea

Wrigley, Stuart

298

Operational test report integrated system test (ventilation upgrade)  

Science Conference Proceedings (OSTI)

Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

HARTY, W.M.

1999-10-05T23:59:59.000Z

299

Antecedents of consumers' intentions to upgrade their mobile phones  

Science Conference Proceedings (OSTI)

The fourth generation (4G) mobile phone will soon be launched. Marketers need to know which factors determine whether customers choose to upgrade their mobile phones, as this will affect the diffusion of third generation (3G), 4G, and Worldwide Interoperability ... Keywords: Mobile phone, Technology acceptance model (TAM), Upgrade, WiMAX

Fang-Mei Tseng; Hui-Yi Lo

2011-02-01T23:59:59.000Z

300

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway  

DOE Green Energy (OSTI)

This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks.

Davis, R.; Biddy, M.; Jones, S.

2013-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

302

Unique Solar Thermal Laboratory Gets an Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade September 10, 2010 - 2:54pm Addthis This “power tower” is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories This "power tower" is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories Lorelei Laird Writer, Energy Empowers The National Solar Thermal Test Facility at Sandia National Laboratories is unique - and in demand. The Facility has been instrumental in NASA tests, national defense programs and concentrated solar technology development.

303

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Efficiency Upgrades Help Retired Military Officers Save Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

304

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Efficiency Upgrades Help Build Better Neighborhoods Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

305

The 12 GeV Energy Upgrade at Jefferson Laboratory  

SciTech Connect

Two new cryomodules and an extensive upgrade of the bending magnets at Jefferson Lab has been recently completed in preparation for the full energy upgrade in about one year. Jefferson Laboratory has undertaken a major upgrade of its flagship facility, the CW re-circulating CEBAF linac, with the goal of doubling the linac energy to 12 GeV. I will discuss here the main scope and timeline of the upgrade and report on recent accomplishments and the present status. I will then discuss in more detail the core of the upgrade, the new additional C100 cryomodules, their production, tests and recent successful performance. I will then conclude by looking at the future plans of Jefferson Laboratory, from the commissioning and operations of the 12 GeV CEBAF to the design of the MEIC electron ion collider.

Pilat, Fulvia C. [JLAB

2012-09-01T23:59:59.000Z

306

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Idaho National Engineering Laboratory Sewer System Upgrade 7: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho SUMMARY This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The proposed action would include activities conducted at the Central Facilities Area, Test Reactor Area, and the Containment Test Facility at the Test Area North at INEL. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1994 EA-0907: Finding of No Significant Impact Idaho National Engineering Laboratory Sewer System Upgrade Project

307

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Upgrades Help Retired Military Officers Save Energy Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

308

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

309

Categorical Exclusion 4598: Security Upgrade Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination Form Determination Form Proposed Action Title: Security Upgrade Project (4598) Program or Field Office~ Y·12 Site Office LocationCs) CCjty/County/State): Oak Ridge. Anderson County, Tennessee Proposed Action Description: PAGE 04 / 04 r~:·:~~s ·'-u ~'irllO:.'~~b ., .. y " ~e ··· ., ;:;;,il ,;: ; I·;;;:;;,; ;I ,' .: :~~. ,U,Illll\;: , "':ll ,l3~ . ~~~~ 1 ~; The proposed action is to add fence posts and run razor wire in various fence locations throughout the site. This project will not require excavation. This activity will disturb gravel but will not remove gravel and soil from post holes which will be placed back in the same area. Cat.eg,orieal Exc!usion(s) ,Mp!i.cd: 81.3- Routine maintenance

310

Transverse instability analysis for the IPNS Upgrade  

SciTech Connect

The proposed 1-MW spallation neutron source upgrade calls for a 2-GeV rapidly-cycling synchrotron (RCS) with an intensity of 1.04{times}10{sup 14} protons per pulse. The potential exists for the excitation of collective, intensity-dependent transverse instabilities. These can normally be controlled by introducing a betatron tune shift or spread, where care is exercised to avoid single-particle resonance effects. Adjusting the chromaticity using sextupoles to vary the head-to-tail phase shift is compared to introducing Landau damping by octupoles. An option for a feedback system is also examined. The momentum spread used for the transverse analysis was obtained from the requirements for longitudinal stability.

Harkay, K.; Cho, Y.

1995-07-01T23:59:59.000Z

311

Steam turbine upgrading: low-hanging fruit  

Science Conference Proceedings (OSTI)

The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

Peltier, R.

2006-04-15T23:59:59.000Z

312

Economic enhancement of Western shale oil upgrading  

DOE Green Energy (OSTI)

A proof-of-concept study for a novel shale oil refining process was undertaken. This project promises reduced upgrading costs, thereby making shale oil development more feasible for commercialization. The process consists of distillation of raw shale oil into a distillate and residue portion, cracking of the residue by hydropyrolysis, and selective hydrotreating of narrow boiling cuts from the total distillate. Based on models and experimental data, the end product slate is projected to be 34% naphtha, 57% middle distillate, and 10.3% atm residue + coke. Hydrogen addition is 1.3% or 800 scf/bbl. These results are considerably improved over conventional processing, which gives 14% naphtha, 41% middle distillate, and 48.2% residue + coke and hydrogen addition of 3.2% or 2000 scf/bbl. More quantitative data and preliminary economics will be obtained in the next phase of study. 13 refs., 3 figs., 6 tabs.

Bunger, J. W.; Ryu, H.; Jeong, S. Y.

1989-07-01T23:59:59.000Z

313

UPGRADING NATURAL GAS VIA MEMBRANE SEPARATION PROCESSES  

SciTech Connect

The objective of the present study is to assess the potential usefulness of membrane separation processes for removing CO{sub 2} and H{sub 2}S from low-quality natural gas containing substantial amounts of both these ''acid'' gases, e.g., up to 40 mole-% CO{sub 2} and 10 mole-% H{sub 2}S. The membrane processes must be capable of upgrading the crude natural gas to pipeline specifications ({le} 2 mole-% CO{sub 2}, {le} 4 ppm H{sub 2}S). Moreover, these processes must also be economically competitive with the conventional separation techniques, such as gas absorption, utilized for this purpose by the gas industry.

S.A.Stern; P.A. Rice; J. Hao

2000-03-01T23:59:59.000Z

314

The DIII-D cryogenic system upgrade  

SciTech Connect

The original DIII-D cryogenic system was commissioned in 1981 and was used to cool the cryopanel arrays for three hydrogen neutral beam injectors. Since then, new demands for liquid helium have arisen including: a fourth neutral beam injector, ten superconducting magnets for the electron cyclotron heating gyrotrons, and more recently, the advanced diverter cryopump which resides inside the tokamak vacuum vessel. The original cryosystem could not meet these demands. Consequently, the cryosystem was upgraded in several phases to increase capacity, improve reliability, and reduce maintenance. The majority of the original system has been replaced with superior equipment. The capacity now exists to support present as well as future demands for liquid helium at DIII-D including a hydrogen pellet injector, which is being constructed by Oak Ridge National Laboratory. Upgrades to the cryosystem include: a recently commissioned 150 {ell}/hr helium liquefier, two 55 g/sec helium screw compressors, a fully automated 20-valve cryogen distribution box, a high efficiency helium wet expander, and the conversion of equipment from manual or pneumatic to programmable logic controller (PLC) control. The distribution box was designed and constructed for compactness due to limited space availability. Overall system efficiency was significantly improved by replacing the existing neutral beam reliquefier Joule-Thomson valve with a reciprocating wet expander. The implementation of a PLC-based automatic control system has resulted in increased efficiency and reliability. This paper will describe the cryosystem design with emphasis on newly added equipment. In addition, performance and operational experience will be discussed.

Schaubel, K.M.; Laughon, G.J.; Campbell, G.L.; Langhorn, A.R.; Stevens, N.C.; Tupper, M.L.

1993-10-01T23:59:59.000Z

315

Upgraded HFIR Fuel Element Welding System  

Science Conference Proceedings (OSTI)

The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

Sease, John D [ORNL

2010-02-01T23:59:59.000Z

316

A Neutral Beam Injector Upgrade for NSTX  

Science Conference Proceedings (OSTI)

The National Spherical Torus Experiment (NSTX) capability with a Neutral Beam Injector (NBI) capable of 80 kiloelectronvolt (keV), 5 Megawatt (MW), 5 second operation. This 5.95 million dollar upgrade reused a previous generation injector and equipment for technical, cost, and schedule reasons to obtain these specifications while retaining a legacy capability of 120 keV neutral particle beam delivery for shorter pulse lengths for possible future NSTX experiments. Concerns with NBI injection included power deposition in the plasma, aiming angles from the fixed NBI fan array, density profiles and beam shine through, orbit losses of beam particles, and protection of the vacuum vessel wall against beam impingement. The upgrade made use of the beamline and cryo panels from the Neutral Beam Test Stand facility, existing power supplies and controls, beamline components and equipment not contaminated by tritium during DT [deuterium-tritium] experiments, and a liquid Helium refrigerator plant to power and cryogenically pump a beamline and three ion sources. All of the Tokamak Fusion Test Reactor (TFTR) ion sources had been contaminated with tritium, so a refurbishment effort was undertaken on selected TFTR sources to rid the three sources destined for the NSTX NBI of as much tritium as possible. An interconnecting duct was fabricated using some spare and some new components to attach the beamline to the NSTX vacuum vessel. Internal vacuum vessel armor using carbon tiles was added to protect the stainless steel vacuum vessel from beam impingement in the absence of plasma and interlock failure. To date, the NBI has operated to 80 keV and 5 MW and has injected requested power levels into NSTX plasmas with good initial results, including high beta and strong heating characteristics at full rated plasma current.

T. Stevenson; B McCormack; G.D. Loesser; M. Kalish; S. Ramakrishnan; L. Grisham; J. Edwards; M. Cropper; G. Rossi; A. von Halle; M. Williams

2002-01-18T23:59:59.000Z

317

UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY  

Science Conference Proceedings (OSTI)

The Continuous Electron Beam Accelerator Facility (CEBAF) accelerator at Jefferson Lab will be upgraded from 6 GeV to 12 GeV in the next few years. To meet the requirement of the new machine and to take the opportunity to improve the beam quality, the CEBAF injector will be upgraded with a higher voltage gun, a new booster, and a new accelerating RF module. The CEBAF injector creates and accelerates three beams at different currents simultaneously. The beams are interleaved, each at one third of the RF frequency, traveling through the same beam line. The higher voltage gun will lower the space charge effects. The new booster with optimized beam dynamics will complete the bunching process and provide initial acceleration matched to the new gun voltage. Using our latest SRF design, the new booster has significantly lower x/y coupling effects that should improve our beam setup and operation for the highly sensitive parity experiments scheduled for the CEBAF's future. Finally, the new accelerating RF module will roughly double the injector final energy to match the rest of the 12 GeV accelerator. In this paper we will provide more detail about this upgrade.

Reza Kazimi, Arne Freyberger, Alicia Hofler, Andrew Hutton, Fay Hannon

2012-07-01T23:59:59.000Z

318

U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative December 23, 2008 - 9:18am...

319

4 MW fast wave current drive upgrade for DIII-D  

SciTech Connect

The DIII-D program has just completed a major addition to its ion cyclotron range of frequency (ICRF) systems. This upgrade project added two new fast wave current drive (FWCD) systems, with each system consisting of a 2 MW, 30 to 120 MHz transmitter, ceramic insulated transmission lines and tuner elements, and water-cooled four-strap antenna. With this addition of 4 MW of FWCD power to the original 2 MW, 30 to 60 MHz capability, experiments can be performed that will explore advanced tokamak plasma configurations by using the centrally localized current drive to effect current profile modifications.

Callis, R.W.; Cary, W.P. [General Atomics, San Diego, CA (United States); Baity, F.W. [Oak Ridge National Lab., TN (United States)] [and others

1994-09-01T23:59:59.000Z

320

RF System Upgrades to the Advanced Photon Source Linear Accelerator in Support of the Fel Operation  

E-Print Network (OSTI)

The S-band linear accelerator, which was built to be the source of particles and the front end of the Advanced Photon Source injector, is now also being used to support a low-energy undulator test line (LEUTL) and to drive a free-electron laser (FEL). The more severe rf stability requirements of the FEL have resulted in an effort to identify sources of phase and amplitude instability and implement corresponding upgrades to the rf generation chain and the measurement system. Test data and improvements implemented and planned are described

Smith, T L; Grelick, A E; Pile, G; Nassiri, A; Arnold, N

2000-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades  

Science Conference Proceedings (OSTI)

Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

Billingsley, Megan; Stuart, Elizabeth

2011-08-17T23:59:59.000Z

322

The Jefferson Lab 12 GeV Upgrade  

Science Conference Proceedings (OSTI)

A major upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Facility is in progress. Construction began in 2008 and the project should be completed in 2015. The upgrade includes doubling the energy of the electron beam to 12 GeV, the addition of a new fourth experimental hall, and new experimental equipment in three of the experimental halls. A brief overview of this upgrade project is presented along with some highlights of the anticipated experimental program.

R.D. McKeown

2011-10-01T23:59:59.000Z

323

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2001 Annual Report.  

DOE Green Energy (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 2001 annual report covers the fifth year of sampling of this multi-year study. In 2001 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon rivers. The Snake River was sampled between Lower Granite Dam (rkm 174) and the mouth of the Salmon River (rkm 303), and the Salmon River was sampled from its mouth upstream to Hammer Creek (rkm 84). A total of 45,907 hours of setline effort and 186 hours of hook-and-line effort was employed in 2001. A total of 390 white sturgeon were captured and tagged in the Snake River and 12 in the Salmon River. Since 1997, 36.1 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 42 cm to 307 cm and averaged 107 cm. In the Salmon River, white sturgeon ranged in total length from 66 cm to 235 cm and averaged 160 cm. Using the Jolly-Seber model, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,483 fish, with a 95% confidence interval of 1,208-7,477. An additional 10 white sturgeon were fitted with radio-tags during 2001. The locations of 17 radio-tagged white sturgeon were monitored in 2001. The movement of these fish ranged from 38.6 km (24 miles) downstream to 54.7 km (34 miles) upstream; however, 62.6 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P<0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 30 percent since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir had a higher relative weight factor than white sturgeon in the free-flowing Snake River. A von Bertalanffy growth curve was fitted to 309 aged white sturgeon. The results suggest fish are currently growing faster than fish historically inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate mats were used to document white sturgeon spawning. A total of 14 white sturgeon eggs were recovered in the Snake River in 2001.

Everett, Scott R.; Tuell, Michael A. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2003-03-01T23:59:59.000Z

324

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 1999 Annual Report.  

DOE Green Energy (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 1999 annual report covers the third year of sampling of this multi-year study. In 1999 white sturgeon were captured, marked and population data were collected in the Snake and Salmon rivers. A total of 33,943 hours of setline effort and 2,112 hours of hook-and-line effort was employed in 1999. A total of 289 white sturgeon were captured and tagged in the Snake River and 29 in the Salmon River. Since 1997, 11.1 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 27 cm to 261 cm and averaged 110 cm. In the Salmon River, white sturgeon ranged in total length from 98 cm to 244 cm and averaged 183.5 cm. Using the Jolly-Seber model, the abundance of white sturgeon < 60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 1,823 fish, with a 95% confidence interval of 1,052-4,221. A total of 15 white sturgeon were fitted with radio-tags. The movement of these fish ranged from 6.4 km (4 miles) downstream to 13.7 km (8.5 miles) upstream; however, 83.6 percent of the detected movement was less than 0.8 kilometers (0.5 miles). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P < 0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 29 percent since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir were slightly larger than white sturgeon in the free-flowing Snake River. A von Bertalanffy growth curve was fitted to 49 aged white sturgeon. The results suggests the fish are currently growing faster than fish historicly inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate mats were used to document white sturgeon spawning. Five white sturgeon eggs were recovered in the Snake River.

Tuell, Michael A.; Everett, Scott R. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2003-03-01T23:59:59.000Z

325

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2000 Annual Report.  

DOE Green Energy (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 2000 annual report covers the fourth year of sampling of this multi-year study. In 2000 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon rivers. The Snake River was sampled between Lower Granite Dam (rkm 174) and the mouth of the Salmon River (rkm 303), and the Salmon River was sampled from its mouth upstream to Hammer Creek (rkm 84). A total of 53,277 hours of setline effort and 630 hours of hook-and-line effort was employed in 2000. A total of 538 white sturgeon were captured and tagged in the Snake River and 25 in the Salmon River. Since 1997, 32.8 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 48 cm to 271 cm and averaged 107 cm. In the Salmon River, white sturgeon ranged in total length from 103 cm to 227 cm and averaged 163 cm. Using the Jolly-Seber open population estimator, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,725 fish, with a 95% confidence interval of 1,668-5,783. A total of 10 white sturgeon were fitted with radio-tags. The movement of these fish ranged from 54.7 km (34 miles) downstream to 78.8 km (49 miles) upstream; however, 43.6 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P<0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 31 percent since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir had a higher relative weight factor than white sturgeon in the free-flowing Snake River. A von Bertalanffy growth curve was fitted to 138 aged white sturgeon. The results suggests fish are currently growing faster than fish historically inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate mats were used to document white sturgeon spawning. A total of 34 white sturgeon eggs were recovered: 27 in the Snake River, and seven in the Salmon River.

Everett, Scott R.; Tuell, Michael A. (Nez Perce Tribe, Department of Fishereis Resource Management, Lapwai, ID)

2003-03-01T23:59:59.000Z

326

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 23550 of 31,917 results. 41 - 23550 of 31,917 results. Page EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona Draft EA: Comment Period Ends 1/24/14 DOE's Western Area Power Administration (Western) is preparing this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. http://energy.gov/nepa/ea-1948-gila-north-gila-rebuild-and-upgrade-project-yuma-county-arizona

327

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

SciTech Connect

In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to hydrocarbon fuels to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This pathway case investigates the upgrading of biomass derived synthesis gas (‘syngas’) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and risk adverse conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas to hydrocarbon pathway to be competitive with petroleum-derived gasoline, diesel and jet range blendstocks.

Talmadge, M.; Biddy, Mary J.; Dutta, Abhijit; Jones, Susanne B.; Meyer, Pimphan A.

2013-03-31T23:59:59.000Z

328

Screening of processing and upgrading schemes  

DOE Green Energy (OSTI)

The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

329

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

330

Find Financing for Energy Efficiency Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Photo of a block in lower downtown Denver that is part of Living City Block, a DOE Commercial Building Partnerships participant. Financing need not be a barrier to improving energy efficiency in your commercial building. There are federal, state, and local and tax incentives for energy efficiency upgrades, and other financial opportunities to help you meet your energy goals. The U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy, for example, offers financial assistance opportunities to business, industry, universities, and others for the development and demonstration of energy efficiency strategies and technologies. Other methods of financing energy efficiency improvements

331

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

332

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

333

Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Case Study - Energy Efficiency Upgrades for Fermilab Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure October 7, 2013 - 3:29pm Addthis Utility energy service contracting provides needed plant improvements. Photo of Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Overview The U.S. Department of Energy's (DOE's) Fermi National Accelerator Laboratory (Fermilab) has replaced old equipment and reduced energy consumption through a partnership with its electric utility, Commonwealth Edison. Fermilab upgraded the centralized cooling system and separated the system into two segments - a "comfort system" to cool the employee office

334

Energy Efficiency Upgrades Part of Winning Formula for Oregon School  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upgrades Part of Winning Formula for Oregon Upgrades Part of Winning Formula for Oregon School District Energy Efficiency Upgrades Part of Winning Formula for Oregon School District August 27, 2012 - 9:45am Addthis The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. Todd G. Allen Project Officer, Golden Field Office What are the key facts? Energy efficiency upgrades will reduce the Vernonia school district's energy usage by 43 percent and save taxpayers more than $62,000 a year. The school will also serve as a laboratory for forest technologies

335

NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability  

NLE Websites -- All DOE Office Websites (Extended Search)

NERSC's Franklin NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability July 20, 2009 OCEAN EDDIES: This image comes from a computer simulation modeling eddies in the ocean. An interesting feature is the abundance of eddies away from the equator, which is shown in the center of the image at y=0. This research collaboration led by Paola Cessi of the Scripps Institute of Oceanography performed over 15,000 years worth of deep ocean circulation simulations with 1.6 million processor core hours on the upgraded Franklin system. The Department of Energy's (DOE) National Energy Research Scientific Computing (NERSC) Center has officially accepted a series of upgrades to its Cray XT4 supercomputer, providing the facility's 3,000 users with twice

336

Builder Brings Tradition to Efficient Home Upgrades | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

home. However, Artistic Homes calculates that the 49,550 price tag to upgrade a 2,157-square-foot home shrinks to about 811 after applying incentives and tax credits. And because...

337

Retrofit Upgrade of Center Break Cell Technology to Point Feeding ...  

Science Conference Proceedings (OSTI)

... been a few attempts worldwide to upgrade these cells so as to implement the newer ... The results show that this project has decreased the energy consumption and ... Production Application Study on Magneto-Hydro-Dynamic Stability of a ...

338

Thomson scattering diagnostic upgrade on DIII-D  

Science Conference Proceedings (OSTI)

The DIII-D Thomson scattering system has been upgraded. A new data acquisition hardware was installed, adding the capacity for additional spatial channels and longer acquisition times for temperature and density measurements. Detector modules were replaced with faster transimpedance circuitry, increasing the signal-to-noise ratio by a factor of 2. This allows for future expansion to the edge system. A second phase upgrade scheduled for 2010-2011 includes the installation of four 1 J/pulse Nd:YAG lasers at 50 Hz repetition rate. This paper presents the first completed phase of the upgrade and performance comparison between the original system and the upgraded system. The plan for the second phase is also presented.

Ponce-Marquez, D. M.; Bray, B. D.; Deterly, T. M.; Liu, C. [General Atomics, P.O. Box 85608, San Diego, California 092186-5608 (United States); Eldon, D. [University of California-San Diego, La Jolla, California 92093-0417 (United States)

2010-10-15T23:59:59.000Z

339

Office of Science Approves Critical Decision 1 for APS Upgrade...  

NLE Websites -- All DOE Office Websites (Extended Search)

2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Office of Science Approves Critical Decision 1 for APS Upgrade Project SEPTEMBER 15, 2011...

340

Energy Star Building Upgrade Manual Lighting Chapter 6  

NLE Websites -- All DOE Office Websites (Extended Search)

O&M Manual 34 Dispose of Lamps Properly 35 6.9 Summary 36 Bibliography 36 Glossary G-1 ENERGY STAR Building Manual 2 6. Lighting 6.1 Overview A lighting upgrade is the second...

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

San Antonio Small Businesses "Seeing the Light" with Energy Upgrades...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

with Energy Upgrades March 21, 2012 - 2:27pm Addthis KBK to the Trade 1 of 5 KBK to the Trade Thanks to the City Lights program, this design shop is saving an estimated 25,500...

342

SRS upgrades helium recovery system | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

upgrades helium recovery system | National Nuclear Security upgrades helium recovery system | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > SRS upgrades helium recovery system SRS upgrades helium recovery system Posted By Office of Public Affairs Savannah River Site (SRS) Tritium Programs recently completed a project to design, build and relocate a new system for separating and capturing

343

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

344

EA-1354: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1354: Finding of No Significant Impact EA-1354: Finding of No Significant Impact EA-1354: Finding of No Significant Impact Fort Collins 115kV Transmission Line Upgrade Project Platte River is proposing to add additional generation at its Rawhide Energy Station, located approximately 18 miles north of Fort Collins, to serve increasing demands for electricity. In order to deliver the additional power generation to customers, the electric transmission system in the Fort Collins area needs to be upgraded. These upgrades require adding new wires to existing power poles or, in some areas, rebuilding the existing transmission line (see Figure 1-1). The proposed upgrades and rebuilds will be within the rights-of-way (ROW) of existing lines. The ROW width of the existing lines are 75-120 feet. The ROWs for the proposed

345

EA-1354: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1354: Final Environmental Assessment EA-1354: Final Environmental Assessment EA-1354: Final Environmental Assessment Fort Collins 115kV Transmission Line Upgrade Project Platte River is proposing to add additional generation at its Rawhide Energy Station, located approximately 18 miles north of Fort Collins, to serve increasing demands for electricity. In order to deliver the additional power generation to customers, the electric transmission system in the Fort Collins area needs to be upgraded. These upgrades require adding new wires to existing power poles or, in some areas, rebuilding the existing transmission line (see Figure 1-1). The proposed upgrades and rebuilds will be within the rights-of-way (ROW) of existing lines. The ROW width of the existing lines are 75-120 feet. The ROWs for the proposed

346

Commissioning results from the recently upgraded RHIC LLRF system  

Science Conference Proceedings (OSTI)

During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

Smith, K.S.; Harvey, M.; Hayes, T.; Narayan, G.; Severino, F.; Yuan, S.; Zaltsman, A.

2011-03-28T23:59:59.000Z

347

Heavy Oil Upgrading from Electron Beam (E-Beam) Irradiation  

E-Print Network (OSTI)

Society's growing demands for energy results in rapid increase in oil consumption and motivates us to make unconventional resources conventional resources. There are enormous amounts of heavy oil reserves in the world but the lack of cost effective technologies either for extraction, transportation, or refinery upgrading hinders the development of heavy oil reserves. One of the critical problems with heavy oil and bitumen is that they require large amounts of thermal energy and expensive catalysts to upgrade. This thesis demonstrates that electron beam (E-Beam) heavy oil upgrading, which uses unique features of E-Beam irradiation, may be used to improve conventional heavy oil upgrading. E-Beam processing lowers the thermal energy requirements and could sharply reduce the investment in catalysts. The design of the facilities can be simpler and will contribute to lowering the costs of transporting and processing heavy oil and bitumen. E-Beam technology uses the high kinetic energy of fast electrons, which not only transfer their energy but also interact with hydrocarbons to break the heavy molecules with lower thermal energy. In this work, we conducted three major stages to evaluate the applicability of E-Beam for heavy oil upgrading. First, we conducted laboratory experiments to investigate the effects of E-Beam on hydrocarbons. To do so, we used a Van de Graff accelerator, which generates the high kinetic energy of electrons, and a laboratory scale apparatus to investigate extensively how radiation effects hydrocarbons. Second, we studied the energy transfer mechanism of E-Beam upgrading to optimize the process. Third, we conducted a preliminary economic analysis based on energy consumption and compared the economics of E-Beam upgrading with conventional upgrading. The results of our study are very encouraging. From the experiments we found that E-Beam effect on hydrocarbon is significant. We used less thermal energy for distillation of n-hexadecane (n-C16) and naphtha with E-Beam. The results of experiments with asphaltene indicate that E-Beam enhances the decomposition of heavy hydrocarbon molecules and improves the quality of upgraded hydrocarbon. From the study of energy transfer mechanism, we estimated heat loss, fluid movement, and radiation energy distribution during the reaction. The results of our economic evaluation show that E-Beam upgrading appears to be economically feasible in petroleum industry applications. These results indicate significant potential for the application of E-Beam technology throughout the petroleum industry, particularly near production facilities, transportation pipelines, and refining industry.

Yang, Daegil

2009-12-01T23:59:59.000Z

348

Transmission Lines and Property Values: State of the Science  

Science Conference Proceedings (OSTI)

Growing energy demand and an aging electricity infrastructure underscore the need for new and upgraded transmission lines. Despite system failures and seasonal symptoms such as rolling brownouts, efforts to expand or improve transmission systems invariably meet with strong opposition. A primary source of this opposition comes from landowners who feel that the presence of a nearby transmission line may cause their property to decrease in value. A significant factor contributing to the contentious nature o...

2003-11-24T23:59:59.000Z

349

Process for upgrading arsenic-containing oils  

DOE Patents (OSTI)

A method is provided for avoiding feed-transfer-line plugging by a deposit comprising arsenic in hydroprocessing an oil containing an arsenic contaminant. In the method, a mixture of hydrogen gas and the oil is formed in situ in a bed of porous particulate contact material.

Sullivan, Richard F. (San Rafael, CA)

1979-01-01T23:59:59.000Z

350

Rebuilding Together Energy Teams  

NLE Websites -- All DOE Office Websites (Extended Search)

is "to preserve and revitalize houses and communities, assuring that low-income homeowners, from the elderly and disabled to families with children, live in warmth, safety,...

351

REBUILDING SARAJEVO USING PARTNERSHIPS  

Science Conference Proceedings (OSTI)

We live in a world of rapid change. Nowhere has this been more evident over the past years than in Sarajevo. Sarajevo, at the heart of Bosnia-Herzegovina, has experienced war and disruption of unprecedented proportions, as witnessed nightly on media ...

Zlatko Lagumdzija; Mark Adkins; Doug Vogel

1997-01-01T23:59:59.000Z

352

Assessment of Wind Loads On Power Lines--Methodology and Applications  

Science Conference Proceedings (OSTI)

Wind load on electrical conductors is one of the most critical design loads for transmission structures, but many methods of determining wind load have only recently been validated experimentally. This document draws on EPRI field research to assist engineers in accurately determining design wind loads for conductors and helping utilities construct new transmission lines and upgrade existing lines at minimum cost while retaining reliability.

1997-08-12T23:59:59.000Z

353

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program < Back Eligibility Commercial Industrial Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Construction Design & Remodeling Manufacturing Sealing Your Home Windows, Doors, & Skylights Ventilation Heat Pumps Commercial Lighting Lighting Insulation Maximum Rebate Up to 100,000 per site per year. Program Info Funding Source Conservation Program Funding Charge State Oregon Program Type Utility Rebate Program Rebate Amount A/C or Heat Pumps: $25-$100/ton Economizer Control Addition: $75/ton Air-Side Economizer Repair: $250 Evaporative Coolers: $100-$300/ton

354

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

355

County Partners with Siemens on Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Partners with Siemens on Energy Upgrades Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

356

Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Efficiency Upgrades in Commercial Energy Efficiency Upgrades in Commercial Buildings Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings On this page you'll find information about the tax deductions available for improving the energy efficiency of commercial buildings, as well as links to qualified software available for calculating these savings. The Energy Policy Act of 2005 (EPACT) offered businesses tax deductions for the costs of improving the energy efficiency of commercial buildings. The Emergency Economic Stabilization Act of 2008 extended provisions in EPACT. The following tax incentives are available under this act. Deduction of the Cost of Energy-Efficient Property Installed in Commercial Buildings Make quick calculations of the estimated energy cost savings from

357

Non-Profit Brighter After Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade September 21, 2010 - 11:09am Addthis Loretta Prencipe Senior Communications Analyst, Office of Energy Efficiency & Renewable Energy In the Spring of 2010, the Arizona State Energy Program awarded Recovery Act funds to 14 non-profit organizations throughout the state for energy projects. One of the recipients, St. Vincent de Paul, is a human services organization that assists people in need throughout Central and Northern Arizona. The nonprofit partnered with Glendale, Arizona-based Natural Lighting Company to install skylights at the facility. In the above video, find out how this project is helping both the nonprofit and the local company. The video was created by Jim Arwood, an independent producer and former

358

Cool Roofs: An Easy Upgrade | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade December 14, 2010 - 9:25am Addthis Cathy Zoi Former Assistant Secretary, Office of Energy Efficiency & Renewable Energy What does this mean for me? Dark roofs can be 50 degrees hotter than light roofs. Combined with dark roads and parking lots, dark roofs lead to the 'urban heat island' effect: cities tend to be 2-5 degrees hotter. A cooler roof means energy bills that are up to 10-15% lower because your air conditioner doesn't have to work as hard. Check out Google Earth - the 'view from above' of your favorite American city. And look at the roofs of the office buildings, warehouses, shopping centers, and even the homes. Most of them are probably pretty dark in color - and this means they heat up a lot when the weather is warm -

359

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

360

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade March 16, 2011 - 2:58pm Addthis April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this project do? In three hours, enough energy is recovered from the TMC to heat 15 loads of water for L&N's largest-capacity washing machine, and enough water is recovered to fill 1-1/2 loads of that same machine. As the provider of laundry and dry cleaning services for Disneyland Resort's costumes and hospitality supply items, L&N Costume and Linen Service knows a little something about both quantity and quality. Now, with the help of the Gas Technology Institute (GTI) and the Department of Energy, this forward-looking enterprise is embracing new, clean energy

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

County Partners with Siemens on Energy Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

362

Secretary of Energy Announces Approval and Funding for Facilities Upgrade  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Approval and Funding for Facilities Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs Secretary of Energy Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs February 22, 2006 - 12:09pm Addthis NEWPORT NEWS , VA - Secretary of Energy Samuel W. Bodman today announced that President Bush's Fiscal Year 2007 budget request includes $7 million for the upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Department of Energy's (DOE) Thomas Jefferson National Accelerator Facility. The secretary also visited with students and teachers from the Newport News area who participate in the lab's highly successful Becoming Enthusiastic about Math and Science (BEAMS) educational

363

Builder Brings Tradition to Efficient Home Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades October 15, 2009 - 5:51pm Addthis Joshua DeLung When Tom Wade's grandfather started building single-family homes, he may not have imagined how far his grandson would take the practice. Tom's father followed in the family footsteps and founded Artistic Homes in Albuquerque, N.M., in the mid-1980s. Now, Tom has led the company from simply building quality, affordable homes to innovating ones that are highly energy-efficient. "My grandfather would absolutely love what we're doing today because he had an incredible passion for - and an interest in - craftsmanship and improving the product, which in this case is the home," Tom says. "The fact that we're using science and technology is something he would

364

Energy Upgrade Program Revitalizing Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon May 28, 2010 - 2:38pm Addthis Joshua DeLung What does this project do? Local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. 'Main streets' in Clackamas County, Oregon, are undergoing a makeover - an energy-efficiency makeover. As part of the Clackamas County Energy Efficiency on Main Street Program, local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. First to save The program needed a guinea pig to be the first to receive a free energy audit and found a willing participant in Key Carpets, a Molalla-based store

365

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

366

Microsoft Word - CX_MerrittRadioStationUpgrade_2013.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Merritt Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Winton, Chelan County, WA Township 26N, Range 16E, and Section 2 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Merritt Radio Station in the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest (USFS). The proposed radio station upgrade would replace the existing communication building, electrical service, and propane tank with a new building and propane tank in adjacent locations on the

367

Living Comfortably: A Consumer's Guide to Home Energy Upgrades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL Dr. Richard Knaub Project Leader in Weatherization & Workforce Development at the National Renewable Energy Laboratory Energy audit tools An infrared camera can display temperature differences between surfaces and help determine if a wall is insulated. It can show drafts and moisture, which can lead to mold problems.

368

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

369

Potential Peak Load Reductions From Residential Energy Efficient Upgrades  

E-Print Network (OSTI)

The demand for electricity is continuing to grow at a substantial rate. Utilities are interested in managing this growth's peak demand for a number of reasons including: costly construction of new generation capacity can be deferred; the reliability of the distribution network can be improved; and added environmental pollution can be minimized. Energy efficiency improvements, especially through residential programs, are increasingly being used to mitigate this rise in peak demand. This paper examines the potential peak load reductions from residential energy efficiency upgrades in hot and humid climates. First, a baseline scenario is established. Then, the demand and consumption impacts of individual upgrade measures are assessed. Several of these upgrades are then combined into a package to assess the synergistic demand and energy impacts. A sensitivity analysis is then performed to assess the impacts of housing characteristics on estimated demand and energy savings. Finally, the demand, energy, and environmental impacts are estimated at the community level.

Meisegeier, D.; Howes, M.; King, D.; Hall, J.

2002-01-01T23:59:59.000Z

370

ENERGY STAR Building Upgrade Manual | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

ENERGY STAR Building Upgrade Manual ENERGY STAR Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach

371

High intensity performance and upgrades at the Brookhaven AGS  

SciTech Connect

For the last two years the Brookhaven AGS has operated the slow extracted beam program at record proton intensities. This high beam intensity allowed for the simultaneous operation of three high precision rare kaon decay experiments. The record beam intensities were achieved after the 1.5 GeV Booster was commissioned and a transition jump system, a powerful transverse damper, and an rf upgrade in the AGS were completed. Recently even higher intensity proton synchrotrons are studied for neutron spallation sources or proton driver for a muon collider. Implications of the experiences from the AGS to these proposals and also possible future upgrades for the AGS are discussed.

Roser, T.

1996-12-31T23:59:59.000Z

372

HOM Survey of the First CEBAF Upgrade Style Cavity Pair  

SciTech Connect

The planned upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Laboratory (JLab) requires ten new superconducting rf (SRF) cavity cryomodules to double the beam energy to the envisaged 12 GeV. Adequate cavity Higher Order Mode (HOM) suppression is essential to avoid multipass, multibunch beam break-up (BBU) instabilities of the recirculating beam. We report on detailed HOM surveys performed for the first two upgrade style cavities tested in a dedicated cavity pair cryomodule at 2K. The safety margin to the BBU threshold budget at 12 GeV has been assessed.

Marhauser, Frank; Davis, G; Drury, Michael; Grenoble, Christiana; Hogan, John; Manus, Robert; Preble, Joseph; Reece, Charles; Rimmer, Robert; Tian, Kai

2009-05-01T23:59:59.000Z

373

Energy and Emissions Savings through Insulation Upgrade Projects  

E-Print Network (OSTI)

The presentation demonstrates the value of including insulation system assessment, repairs and upgrades on a facility's physical function and its importance in the overall energy and environmental management program. Financial and environmental benefits are quantified and physical improvements detailed. The presentation will highlight the key components and successful execution of an insulation assessment and upgrade project. This includes: • The extent of the problem • How the current state happened • The stake / reward for plants Specific case studies will be used including Sunoco and Marathon Petroleum

Lettich, M.

2008-01-01T23:59:59.000Z

374

Building Upgrade Manual | ENERGY STAR Buildings & Plants  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Upgrade Manual Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

375

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

376

Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

About This Guide If you're a leader in a community that has met with disaster and must be rebuilt, this guide is for you. It's intended to show how communities-big or small-can incorporate green principles and technologies like energy efficiency and renewable energy into their rebuilding plans. The information in this guide is based on the real-life experiences of two U.S. Department of Energy (DOE) teams. One team worked with city leaders in New Orleans, Louisiana, after hurricanes Katrina and Rita in 2005, and the other assisted community leaders in Greens- burg, Kansas, after a devastating tornado in 2007. Although the two communities are quite different, the teams learned common lessons and found that

377

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland

378

Proposed Project: Plains & Eastern Clean Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Proposed Project: Plains & Eastern Clean Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line's proposal was responsive to the RFP, and it is currently under consideration. The proposed Plains & Eastern Clean Line project (the proposed project) would include an overhead +/- 600 kV direct current electric transmission system and associated facilities with the capacity to deliver approximately

379

BEAM LINE  

NLE Websites -- All DOE Office Websites (Extended Search)

BEAM LINE BEAM LINE 45 W ILHELM ROENTGEN'S INITIAL DISCOVERY of X-radiation in 1895 led immediately to practical applications in medicine. Over the next few decades X rays proved to be an invaluable tool for the investigation of the micro-world of the atom and the development of the quantum theory of matter. Almost a century later, telescopes designed to detect X-radiation are indispensable for understanding the structure and evolution of the macro-world of stars, galaxies, and the Universe as a whole. The X-Ray Universe by WALLACE H. TUCKER X-ray images of the Universe are strikingly different from the usual visible-light images. 46 SUMMER 1995 did not think: I investigated." Undeterred by NASA's rejection of a proposal to search for cosmic X-radiation, Giacconi persuaded the

380

Rebates Cut the Price of Big-Time Efficiency Upgrades | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades February 22, 2010 - 5:52pm Addthis One of the smartest ways for...

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Innovative Technology Improves Upgrading Process for Unconventional Oil  

NLE Websites -- All DOE Office Websites (Extended Search)

09, 2013 09, 2013 Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Washington, D.C. - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil recovery methods, such as steam and hot water injection, to reduce its viscosity and enable it to flow. The largest U.S. deposits of heavy oil are in California and on Alaska's North Slope. Estimates for the U.S. heavy oil resource total about 104 billion barrels of oil in place - nearly five times the United States' proved reserves. In addition, although no commercial-scale development of U.S. oil sands or oil shale has yet occurred, both represent another potential future domestic unconventional oil resource.

382

Considerations for Polarimetric Upgrades to Operational WSR-88D Radars  

Science Conference Proceedings (OSTI)

This paper reports on the steps taken by the National Severe Storms Laboratory (NSSL) to 1) develop open system hardware to facilitate upgrades to the WSR-88D (NEXRAD) radar and 2) improve identification of the type of precipitation and its ...

R. J. Doviak; V. Bringi; A. Ryzhkov; A. Zahrai; D. Zrni?

2000-03-01T23:59:59.000Z

383

Technologies for Upgrading Light Water Reactor Outlet Temperature  

SciTech Connect

Nuclear energy could potentially be utilized in hybrid energy systems to produce synthetic fuels and feedstocks from indigenous carbon sources such as coal and biomass. First generation nuclear hybrid energy system (NHES) technology will most likely be based on conventional light water reactors (LWRs). However, these LWRs provide thermal energy at temperatures of approximately 300°C, while the desired temperatures for many chemical processes are much higher. In order to realize the benefits of nuclear hybrid energy systems with the current LWR reactor fleets, selection and development of a complimentary temperature upgrading technology is necessary. This paper provides an initial assessment of technologies that may be well suited toward LWR outlet temperature upgrading for powering elevated temperature industrial and chemical processes during periods of off-peak power demand. Chemical heat transformers (CHTs) are a technology with the potential to meet LWR temperature upgrading requirements for NHESs. CHTs utilize chemical heat of reaction to change the temperature at which selected heat sources supply or consume thermal energy. CHTs could directly utilize LWR heat output without intermediate mechanical or electrical power conversion operations and the associated thermodynamic losses. CHT thermal characteristics are determined by selection of the chemical working pair and operating conditions. This paper discusses the chemical working pairs applicable to LWR outlet temperature upgrading and the CHT operating conditions required for providing process heat in NHES applications.

Daniel S. Wendt; Piyush Sabharwall; Vivek Utgikar

2013-07-01T23:59:59.000Z

384

Recent Upgrade of the Klystron Modulator at SLAC  

SciTech Connect

The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

2011-11-04T23:59:59.000Z

385

Testing of FMI's Coal Upgrading Process  

SciTech Connect

WRI and FMI have collaborated to develop and test a novel coal upgrading technology. Proprietary coal upgrading technology is a fluidized bed-based continuous process which allows high through-puts, reducing the coal processing costs. Processing is carried out under controlled oxidizing conditions at mild enough conditions that compared to other coal upgrading technologies; the produced water is not as difficult to treat. All the energy required for coal drying and upgrading is derived from the coal itself. Under the auspices of the Jointly Sponsored Research Program, Cooperative Agreement DE-FC26-98FT40323, a nominal 400 lbs/hour PDU was constructed and operated. Over the course of this project, several low-rank coals were successfully tested in the PDU. In all cases, a higher Btu, low moisture content, stable product was produced and subsequently analyzed. Stack emissions were monitored and produced water samples were analyzed. Product stability was established by performing moisture readsorption testing. Product pyrophobicity was demonstrated by instrumenting a coal pile.

Vijay Sethi

2009-03-21T23:59:59.000Z

386

COUNTY OF SAN DIEGO Energy Upgrade San Diego  

E-Print Network (OSTI)

) $ 60,250 San Diego Co. Water Authority (building owner incentives) $ 150,000 San Diego EnergySoft CalCerts, Inc. Strategic Energy Innovations Manpower CBPCA Partnering Clean EnergyCOUNTY OF SAN DIEGO Energy Upgrade San Diego Summary Sheet ARRA EECBG Discretionary Funding

387

Microsoft Word - CX-SouthTacomaSubstationOlympicPipelineFenceUpgrade_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2011 7, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Timothy Wicks Realty Specialist - TERR-Covington Proposed Action: Grant the Olympic Pipeline Company permission to upgrade an existing fence along the northern property line of Bonneville Power Administration's (BPA) South Tacoma Substation to enhance security. PP&A Project No.: PP&A-2054 Budget Information: N/A Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.11 Fencing, no adverse effect on wildlife movement/surface water flow. Installation of fencing, including that for border marking that will not adversely affect wildlife movements or surface water flow. Location: S36 T9N R3E WM, in Pierce County, Washington. BPA Parcel #STAC-SS-SY

388

Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Bouse Substation Expansion and Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western has requested that APS relocate an existing 69kV transmission line. This will consist of replacing existing conductor and 69-kV Gang Operated Switch and installing 6 new steel monopole structures, an above ground primary meter and underground cable from the 3 phase transition. The project is located in La Paz County, Arizona. The legal description is Section 27 & 34 Township 8 North, Range 19 West on the Gila and Salt River Baseline and Meridian (USGS Black Peak & Bouse NW, AZ 7.5' maps). Western owns the land. This work is planned to begin the month of September 2011 and be completed by

389

Flat bunch creation and acceleration: a possible path for the LHC luminosity upgrade  

Science Conference Proceedings (OSTI)

Increasing the collider luminosity by replacing bunches having Gaussian line-charge distribution with flat bunches, but with same beam-beam tune shift at collision, has been studied widely in recent years. But, creation of 'stable' flat bunches (and their acceleration) using a multiple harmonic RF system has not been fully explored. Here, we review our experience with long flat bunches in the barrier RF buckets at Fermilab.We presentsome preliminary results from beam dynamics simulations and recent beam studies in the LHC injectors to create stable flat bunches using double harmonic RF systems. The results deduced from these studies will be used to model the necessary scheme for luminosity upgrade in the LHC. We have also described a viable (and economical) way for creation and acceleration of flat bunches in the LHC. The flat bunch scheme may have many advantages over the LHC baseline scenario, particularly because of the reduced momentum spread of the bunch for increased intensities.

Bhat, C.M.; /Fermilab

2009-05-01T23:59:59.000Z

390

Properties of Alfven Eigenmodes in the TAE range on the National Spherical Torus Experiment-Upgrade  

SciTech Connect

A second Neutral Beam (NB) injection line is being installed on the NSTX Upgrade device, resulting in six NB sources with di erent tangency radii that will be available for heating and current drive. This work explores the properties of instabilities in the frequency range of the Toroidal Alfv#19;en Eigenmode (TAE) for NSTX-U scenarios with various NB injection geometries, from more perpendicular to more tangential, and with increased toroidal magnetic eld with respect to previous NSTX scenarios. Predictions are based on analysis through the ideal MHD code NOVA-K. For the scenarios considered in this work, modi cations of the Alfv#19;en continuum result in a frequency upshift and a broadening of the radial mode structure. The latter e ect may have consequences for fast ion transport and loss. Preliminary stability considerations indicate that TAEs are potentially unstable, with ion Landau damping representing the dominant damping mechanism

none,

2013-04-24T23:59:59.000Z

391

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

Science Conference Proceedings (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

392

Project Management Plan (PMP), W-364, 209E septic system upgrade, 200 East Area  

SciTech Connect

The document is the Project Management Plan (PMP) of the design and installation of the 209E Septic System Upgrade.

Lott, D.T.

1994-09-20T23:59:59.000Z

393

Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet)  

SciTech Connect

The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numerous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a unique source for defining high-quality home energy upgrades, establishing clear expectations for homeowners, contractors, trainers, workers, program administrators, and organizations that provide financing for energy upgrades.

Not Available

2012-11-01T23:59:59.000Z

394

EBR-II argon cooling system restricted fuel handling I and C upgrade  

SciTech Connect

The instrumentation and control of the Argon Cooling System (ACS) restricted fuel handling control system at Experimental Breeder Reactor II (EBR-II) is being upgraded from a system comprised of many discrete components and controllers to a computerized system with a graphical user interface (GUI). This paper describes the aspects of the upgrade including reasons for the upgrade, the old control system, upgrade goals, design decisions, philosophies and rationale, and the new control system hardware and software.

Start, S.E.; Carlson, R.B.; Gehrman, R.L. [Argonne National Lab., Idaho Falls, ID (United States). Engineering Div.

1995-06-01T23:59:59.000Z

395

4 MW upgrade to the DIII-D fast wave current drive system  

SciTech Connect

The DIII-D fast wave current drive (FWCD) system is being upgraded by an additional 4 MW in the 30 to 120 MHz frequency range. This capability adds to the existing 2 MW 30 to 60 MHz system. Two new ABB transmitters of the type that are in use on the ASDEX-Upgrade tokamak in Garching will be used to drive two new water-cooled four-strap antennas to be installed in DIII-D in early 1994. The transmission and tuning system for each antenna will be similar to that now in use for the first 2 MW system on DIII-D, but with some significant improvements. One improvement consists of adding a decoupler element to counter the mutual coupling between the antenna straps which results in large imbalances in the power to a strap for the usual current drive intrastrap phasing of 90{degrees}. Another improvement is to utilize pressurized, ceramic-insulated transmission lines. The intrastrap phasing will again be controlled in pairs, with a pair of straps coupled in a resonant loop configuration, locking their phase difference at either 0 or 180{degrees}, depending upon the length of line installed. These resonant loops will incorporate a phase shifter so that they will be able to be tuned to resonance at several frequencies in the operating band of the transmitter. With the frequency change capability of the ABB generators, the FWCD frequency will thus be selectable on a shot-to-shot basis, from this preselected set of frequencies. The schedule is for experiments to begin with this added 4 MW capability in mid-1994. The details of the system are described.

deGrassie, J.S.; Pinsker, R.I.; Cary, W.P.

1993-10-01T23:59:59.000Z

396

Low rank coal upgrading in a flow of hot water  

Science Conference Proceedings (OSTI)

Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura [Kyoto University, Kyoto (Japan). Department of Chemical Engineering

2009-09-15T23:59:59.000Z

397

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

1993-12-01T23:59:59.000Z

398

MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements  

NLE Websites -- All DOE Office Websites (Extended Search)

MFRSR Head Refurbishment, Data Logger Upgrade MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements Gary Hodges, CIRES/NOAA and John Schmelzer, PNL gary.hodges@noaa.gov, john.schmelzer@pnl.gov 17th Annual ARM Science Team Meeting 26-30 March 2006 Monterey, CA Head Refurbishment The Process Includes: * New filter detectors * Relocate internal thermistors * New connectors * Gain resistors moved to head * Improved insulation The Finished Heads: * Are lamp calibrated * Have filter profiles measured * Cosine characterized * Are out-of-band tested What Does This Mean For Data Users? * Fewer data gaps * Fewer DQRs * Confidence in the data * Well calibrated data Calibration Improvements 5 6 7 8 0 2 4 6 Airmass ln Direct Data will now be calibrated by the Langley method Extrapolate to TOA to get V 0 Benefits of Langley vs. Lamp calibrations:

399

HERA Luminosity Upgrade Magnet Production | Superconducting Magnet Division  

NLE Websites -- All DOE Office Websites (Extended Search)

HERA Luminosity Upgrade Magnet Production HERA Luminosity Upgrade Magnet Production Photos taken on or before 12-May-2000. GO horizontal test setup GO horizontal test setup view toward lead tower GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO Coldmass GO Coldmass GO sextupole coil GO sextupole coil GO quadrupole coil lead end GO quadrupole coil lead end

400

Microsoft Word - CX_TunkRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 30, 2012 May 30, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Tunk Mountain Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Synarep, Okanogan County, WA Township 35N, Range 29E, and Section 8 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Tunk Mountain Radio Station in the Tonasket Ranger District of the Okanogan-Wenatchee National Forest. BPA is coordinating with the U.S. Forest Service (USFS) to ensure the existing land use permit is

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - AlbionButteRSCommunicationUpgrade-CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Albion Butte Radio Station Communication Upgrade Budget Information: Work Order # 00253466 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Cassia County, Idaho - Section 19, Township 11 South, Range 26 East of the Nibbs Creek Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade the communication building and equipment at BPA's Albion Butte Radio Station located in Cassia County, ID. This project is part of an

402

Microsoft Word - Holcomb and Naselle Communication Upgrade CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2011 6, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Holcomb Radio Station and Naselle Substation Communication Upgrade Project Budget Information: Work Order # 00253203 and # 00253206 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Locations: Holcomb Radio Station: Pacific County, Washington - Township 13 North, Range 7 West, Section 30 of the Lebam Quadrangle Naselle Substation: Pacific County, Washington - Township 10 North, Range 9 West, Section 4 of the Oman Ranch Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to upgrade the communication equipment at

403

Posted CX Q14 Sprinkler System Upgrade.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(NEPA) Categorical Exclusion (eX) (NEPA) Categorical Exclusion (eX) Determination Summary Form Q14 Sprinkler System Upgrade Project REFERENCE J 10 CFR Part 1021 , Department of Energy National Environmental Policy Act Implementation Procedures, Subpart 0 , Typical Classes of Actions PROJECT SCOPE DISCUSSION The project scope will upgrade the Q14 sprinkler system to meet exposed plastic design basis requirements by installing a fire pump and performing modifications to the Q14 sprinkler piping. The fire pump will be a pre-assembled skid system with enclosure diesel powered pump and associated diesel storage tank. The fire pump assembly wi ll be located on a foundation pad in the grassy area ,;!orthwest of 014. Electrical work will include providing general power to the fire pump building and fire pump control/alarm wiring to a fire alarm panel in the 014

404

Investment and Upgrade in Distributed Generation under Uncertainty  

NLE Websites -- All DOE Office Websites (Extended Search)

Investment and Upgrade in Distributed Generation under Uncertainty Investment and Upgrade in Distributed Generation under Uncertainty Speaker(s): Afzal Siddiqui Karl Maribu Date: September 4, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose The ongoing deregulation of electricity industries worldwide is providing incentives for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via heat exchangers (HXs) to meet local energy loads. Although the electric-only effciency of DG is lower than that of central-station production, relatively high tariff rates and the potential for CHP applications increase the attractiveness of on-site generation. Nevertheless, a microgrid contemplating the installation of gas-fired DG has to be aware of the uncertainty in the

405

Microsoft Word - CX-2013ElectronicEquipmentUpgrades_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 12, 2013 April 12, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Molly Kovaka Bob Trismen Contractor - TEP-CSB-2 Electrical Engineer - TEP-CSB-1 Proposed Action: Electronic Equipment Upgrades and Emergency Generator Replacements PP&A Project No: 2571 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment; B1.3 Routine maintenance activities Location: Multiple locations within Bonneville Power Administration's (BPA) service area. Proposed by: BPA Description of the Proposed Action: BPA proposes to upgrade electronic equipment required for operation of its transmission grid and replace emergency generators. Several types of actions involving communications, meters, relays, and Remedial Action Scheme (RAS) and Supervisory

406

Microsoft Word - CX_MetalineRadioStationUpgrade_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 11, 2012 July 11, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Metaline Radio Station Upgrade Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Metaline Falls, Pend Orielle County, WA Township 40N, Range 43E, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Metaline Radio Station in the Sullivan Lake Ranger District of the Colville National Forest. BPA is coordinating with the US Forest Service (USFS) to ensure the existing land use agreement is modified to adequately address

407

Criticality benchmark comparisons leading to cross-section upgrades  

Science Conference Proceedings (OSTI)

For several years criticality benchmark calculations with COG. COG is a point-wise Monte Carlo code developed at Lawrence Livermore National Laboratory (LLNL). It solves the Boltzmann equation for the transport of neutrons and photons. The principle consideration in developing COG was that the resulting calculation would be as accurate as the point-wise cross-sectional data, since no physics computational approximations were used. The objective of this paper is to report on COG results for criticality benchmark experiments in concert with MCNP comparisons which are resulting in corrections an upgrades to the point-wise ENDL cross-section data libraries. Benchmarking discrepancies reported here indicated difficulties in the Evaluated Nuclear Data Livermore (ENDL) cross-sections for U-238 at thermal neutron energy levels. This led to a re-evaluation and selection of the appropriate cross-section values from several cross-section sets available (ENDL, ENDF/B-V). Further cross-section upgrades anticipated.

Alesso, H.P.; Annese, C.E.; Heinrichs, D.P.; Lloyd, W.R.; Lent, E.M.

1993-03-01T23:59:59.000Z

408

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway  

Science Conference Proceedings (OSTI)

In support of the Bioenergy Technologies Office, the National Renewable Energy Laboratory (NREL) and the Pacific Northwest National Laboratory (PNNL) are undertaking studies of biomass conversion technologies to identify barriers and target research toward reducing conversion costs. Process designs and preliminary economic estimates for each of these pathway cases were developed using rigorous modeling tools (Aspen Plus and Chemcad). These analyses incorporated the best information available at the time of development, including data from recent pilot and bench-scale demonstrations, collaborative industrial and academic partners, and published literature and patents. This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline, diesel and jet range hydrocarbon blendstocks.

Davis, Ryan; Biddy, Mary J.; Jones, Susanne B.

2013-03-31T23:59:59.000Z

409

Jefferson Lab 12 GeV CEBAF Upgrade  

Science Conference Proceedings (OSTI)

The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at ~6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a $310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

Claus Rode

2010-04-01T23:59:59.000Z

410

Federal Finance Facilities Available for Energy Efficiency Upgrades  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finance Facilities Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities At-A-Glance ................................................................................... 7 3.1 Matrix of Federal Finance Facilities by Type and Agency .............................................. 7 4 Profiles of Federal Finance Facilities Available for Clean Energy .......................................... 8

411

Requirements Engineering for Digital Upgrades: Specification, Analysis, and Tracking  

Science Conference Proceedings (OSTI)

As nuclear power plants upgrade their instrumentation and control (I&C) systems with digital equipment to continue meeting safety and reliability requirements while controlling operating costs, the transition to the new technology has brought new challenges in properly specifying and confirming the correct performance of digital systems and devices. This guideline describes an approach that utilities can use to refine and improve their processes for developing and verifying requirements for digital upgra...

1997-12-09T23:59:59.000Z

412

UPGRADE OF INSTRUMENTATION FOR PURDUE REACTOR PUR-1, PHASE 3  

Science Conference Proceedings (OSTI)

The major objective of this program is to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective one project on design and installation of interface cards for channel four detector was considered. This report is the final report and gives the efforts and progress achieved on these projects from August 2002 to July 2004.

S. T. Revankar

2004-09-24T23:59:59.000Z

413

Status of Centralized Environmental Creep Testing Facility Preparation and Upgrade  

SciTech Connect

Because the ASME Codes do not cover environmental issues that are crucial in the design and construction of VHTR system, investigation of long-term impure helium effects on metallurgical stability and properties becomes very important. The present report describes the development of centralized environmental creep testing facility, its close collaborations with the experiments in low velocity helium recirculation loop, important lessons learned, upgrades in system design in FY06, and current status of the development.

Ren, Weiju [ORNL; Battiste, Rick [ORNL

2006-10-01T23:59:59.000Z

414

Snowmass White Paper CMS Upgrade: Forward Lepton-Photon System  

E-Print Network (OSTI)

This White Paper outlines a proposal for an upgraded forward region to extend CMS lepton (e, mu) and photon physics reach out to 2.2

Bilki, Burak; Onel, Yasar; Winn, David R; Yetkin, Taylan

2013-01-01T23:59:59.000Z

415

Seismic review of vault for MFTF upgrade project  

SciTech Connect

This letter report was prepared in accordance with the scope of work for the preconceptual seismic evaluation of the (..cap alpha.. + T) Tandem Mirror Fusion Machine concrete vault. The scope of the work was developed with the assistance of the Bechtel site representative Dr. Sunil Ghose. The report contains comments and preconceptual recommendations on wall upgrading for an 150-ton crane installation, concrete vault seismic capability for (..cap alpha.. + T) conditions, and recommendations for future work.

Franklin, H.A.

1983-09-29T23:59:59.000Z

416

I&C Upgrades for Nuclear Plants -- Desk Reference 1997  

Science Conference Proceedings (OSTI)

To assist utilities in designing, implementing, and managing digital upgrades of instrumentation and control systems, EPRI has produced a set of documents that address the key technical and regulatory issues. However, the aggregate now comprises several thousand pages of printed materials, and it is simply not practical for a utility engineer to become familiar with all of it. This document provides brief descriptions of the available documents, along with navigation aides to quickly steer the user to th...

1997-12-08T23:59:59.000Z

417

Assessment of Electrostatic Precipitator (ESP) Upgrade Options: Survey and Analysis  

Science Conference Proceedings (OSTI)

The electrostatic precipitator (ESP) performance analysis in this interim report is intended to aid in selection of the most effective upgrade technologies, which are identified and discussed in EPRI report 1023077, ESP Performance Optimization. This second in a series of reports contains a new, first-order procedure for evaluating the performance of an existing ESP in order to determine which of the technologies discussed in the earlier report will produce the greatest improvement in ...

2013-06-15T23:59:59.000Z

418

Commissioning Results of the Upgraded Neutralized Drift Compression Experiment  

SciTech Connect

Recent changes to the NDCX beamline offer the promise of higher charge compressed bunches (>15nC), with correspondingly large intensities (>500kW/cm2), delivered to the target plane for ion-beam driven warm dense matter experiments. We report on commissioning results of the upgraded NDCX beamline that includes a new induction bunching module with approximately twice the volt-seconds and greater tuning flexibility, combined with a longer neutralized drift compression channel.

Lidia, S.M.; Roy, P.K.; Seidl, P.A.; Waldron, W.L.; Gilson, E.P.

2009-04-30T23:59:59.000Z

419

Post Production Heavy Oil Operations: A Case for Partial Upgrading  

E-Print Network (OSTI)

The transportation of heavy oil is a pressing problem. Various methods have been devised to mitigate the reluctance to flow of these highly dense and viscous oils. This study is focused on evaluating a case for post-production partial upgrading of heavy oil. Specifically, we analyze the impact of visbreaking, a mild thermal cracking method, on the economic and energy demands of the post-production process. Using conservative modeling techniques and principles we find significant cost and energy savings can potentially result out of visbreaking. Cost savings result as a consequence of reduced diluent usage. Even the most conservative modeling scenario under consideration exhibits significant cost savings in the form of reduced diluent usage; these savings not only offset operational costs but provide short payback periods on capital expenditures. Additionally, the lower gravity blend resulting from visbreaking can also bring about energy and cost savings in pipeline transportation and positively impact the heavy oil value chain from the producer to a refinery or regional upgrading facility. From this basic analysis of the potential of visbreaking, we can recommend investing resources to study its viability in the field. Using this analysis as a tipping off point and with a detailed look at the chemistry of the oil in question it is possible to make a very viable case for visbreaking. In a similar vein, this analysis can serve as a guide in making a case for other partial upgrading methods as well.

Lokhandwala, Taher

2012-12-01T23:59:59.000Z

420

UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION  

SciTech Connect

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

Anna Lee Tonkovich

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

A new ATLAS efficiency and intensity upgrade project.  

SciTech Connect

The ATLAS facility provides beams of essentially all stable isotopes at energies above the Coulomb barrier for nuclear physics research. We have developed a two-stage ATLAS upgrade plan which includes the replacement of aging split-ring cavities by high-performance quarter-wave resonators (QWR) capable of accelerating {approx}100 p{mu}A ion beams. The first stage of the upgrade project funded through the American Recovery and Reinvestment Act includes accelerator efficiency increase by adding a new RFQ injector, development and construction of a new cryomodule containing up to 3 SC solenoids and 8 QWRs. A new 72.75 MHz resonator is designed for an optimum ion velocity {beta} = 0.075. To achieve record high accelerating voltage {approx}2.5 MV at this very low velocity range, EM properties of the resonator are highly optimized to reduce peak surface fields. The resonator will be equipped with a piezoelectric fast tuner and capacitive coupler to transmit several kilowatts of RF power. The vast experience gained during the development, commissioning and operation of the ATLAS energy upgrade cryomodule [1] will be applied for the design of the new cryomodule.

Ostroumov, P. N.; Fuerst, J. D.; Kelly, M. P.; Mustapha, B.; Shepard, K. W.; Xu, J.; Physics

2009-01-01T23:59:59.000Z

422

Snowflake divertor configuration studies for NSTX-Upgrade  

SciTech Connect

Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

Soukhanovskii, V A

2011-11-12T23:59:59.000Z

423

Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deputy Secretary Poneman to Clean Line Energy Regarding Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) More Documents & Publications Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of

424

EA-1456: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56: Final Environmental Assessment 56: Final Environmental Assessment EA-1456: Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Loveland, Colorado Western Area Power Administration (Western) is proposing to upgrade the existing Cheyenne- Miracle Mile (CH-MM) and Ault-Cheyenne (AU-CH) 115 kilovolt (115-kV ) transmission lines to 230-kV. The proposed project consists of rebuilding these transmission lines and making modifications to Western's existing Miracle Mile, Cheyenne and Ault Substations to accommodate the 230-kV circuits. A new Snowy Range Substation would also be build near Laramie, Wyoming. DOE/EA-1456; Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Western Area Power

425

Octupole coil configuration for the Tandem Mirror Experiment Upgrade (TMX-U)  

Science Conference Proceedings (OSTI)

The octupole plug concept offers the attractive possibility of reducing the length of the plug and transition sections in tandem mirror reactors. In the Tandem Mirror Experiment Upgrade (TMX-U), we are designing an octupole plug-transition that will replace our current quadrupole plug-transition. The reduction in length is made possible by the more nearly circular plasma cross section throughout the plug and transition sections. The principal physics of the design is the magnetohydrodynamic (MHD) stabilization of the core plasma in the plug by a hot electron ring in the mantle region surrounding the core. This hot electron mantle is MHD stable because of the good curvature field lines provided by the octupole. The positive radial pressure gradient in the hot electron mantle in turn stabilizes the core's plasma. Each octupole set consists of six coils replacing the transition and plug sets in the existing TMX-U experiment. The central cell coils will remain unchanged. Five of the coils for each of the new sets will be fabricated, while one, the 6-T mirror coil, will be reused from TMX-U. This paper will elaborate on the design configuration of the magnets. In particular, the configuration provides for adequate neutral beam lines-of-sight, and access for 0.615 MW of electron-cyclotron resonant heating (ECRH) on each end.

Wong, R.L.; Calderon, M.O.; Felker, B.; Jackson, M.C.; Pedrotti, L.R.

1985-11-14T23:59:59.000Z

426

Booster main magnet power supply, present operation and potential future upgrades  

SciTech Connect

The Brookhaven Booster Main Magnet Power Supply (MMPS) is a 24 pulse thyristor control supply, rated at 5500 Amps, +/-2000 Volts, or 3000 Amps, +/-6000 Volts. The power supply is fed directly from the power utility and the peak magnet power is 18 MWatts. This peak power is seen directly at the incoming ac line. This power supply has been in operation for the last 18 years. This paper will describe the present topology and operation of the power supply, the feedback control system and the different modes of operation of the power supply. Since the power supply has been in operation for the last 18 years, upgrading this power supply is essential. A new power supply topology has been studied where energy is stored in capacitor banks. DC to DC converters are used to convert the dc voltage stored in the capacitor banks to pulsed DC voltage into the magnet load. This enables the average incoming power from the ac line to be constant while the peak magnet power is pulsed to +/- 18 MWatts. Simulations and waveforms of this power supply will be presented.

Bajon, E.; Bannon, M.; Marneris, I.; Danowski, G.; Sandberg, J.; Savatteri, S.

2011-03-28T23:59:59.000Z

427

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

428

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

429

NIST Releases Test Framework for Upgrading of Smart Meters | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NIST Releases Test Framework for Upgrading of Smart Meters NIST Releases Test Framework for Upgrading of Smart Meters NIST Releases Test Framework for Upgrading of Smart Meters July 12, 2012 - 10:46am Addthis The National Institute of Standards and Technology (NIST) has released a draft set of guidelines that will help utilities test their procedures for upgrading their smart meters securely from a remote location and determine whether their procedures conform with the National Electrical Manufacturers Association (NEMA) Standard for Smart Grid Upgradeability. Available now for public comment, the Advanced Metering Infrastructure Smart Meter Upgradeability Test Framework includes test procedures and detailed steps for conducting the test, reviewing results, and producing records to assess and report on these results.

430

Network Upgrade for the SLC: Control System Modifications  

SciTech Connect

Current communications between the SLAC Linear Collider control system central host and the SLCmicros is built upon the SLAC developed SLCNET communication hardware and protocols. We will describe how the Internet Suite of protocols (TCP/IP) are used to replace the SLCNET protocol interface. The major communication pathways and their individual requirements are described. A proxy server is used to reduce the number of total system TCP/IP connections. The SLCmicros were upgraded to use Ethernet and TCP/IP as well as SLCNET. Design choices and implementation experiences are addressed.

Crane, M.; Mackenzie, R.; Sass, R.; Himel, T.; /SLAC

2011-09-09T23:59:59.000Z

431

Searches for Higgs Boson(s) at the Upgraded Tevatron  

E-Print Network (OSTI)

We summarize the status of Higgs boson searches at the upgraded Fermilab Tevatron performed by the DO and CDF collaborations. We report on three categories of searches, namely 1) the search for the Standard Model Higgs boson (p\\bar{p} --> H, WH or ZH, with H --> WW* and/or H --> b\\bar{b}), 2) the search for the minimal supersymmetric Higgs boson using p\\bar{p} --> hb\\bar{b} --> b\\bar{b}b\\bar{b} and p\\bar{p} --> hX --> tau tau X, 3) the search for doubly charged Higgs boson.

Gregorio Bernardi; for the CDF; D0 collaborations

2005-07-14T23:59:59.000Z

432

Energy Efficiency Upgrades for Little Rock Air Force Base  

DOE Green Energy (OSTI)

Little Rock Air Force Base (LRAFB), in partnership with the local utility, Entergy Services, Inc., has reduced energy costs and used savings from investments in high-efficiency equipment to maintain and improve the condition of base housing and other facilities. Three projects were completed, with over $10 million invested. Major accomplishments include replacing air-to-air heat pumps with high-efficiency ground-source heat pumps (GSHPs) in more than 1,500 base housing units, lighting modifications to 10 buildings, upgrade of HVAC equipment in the base's enlisted club, and energy-efficient lighting retrofits for LRAFB's flight simulator.

Goldman, C.; Dunlap, M.A.

2000-11-13T23:59:59.000Z

433

Searches for Higgs boson(s) at the upgraded Tevatron  

SciTech Connect

We summarize the status of Higgs boson searches at the upgraded Fermilab Tevatron performed by the D0 and CDF collaborations. We report on three categories of searches, namely the search for the Standard Model Higgs boson (p{bar p} {yields} H, WH or ZH, with H {yields} WW* and/or H {yields} b{bar b}), the search for the minimal supersymmetric Higgs boson using p{bar p} {yields} hb{bar b} {yields} b{bar b}b{bar b} and p{bar p} {yields} hX {yields} {tau}{tau}X, and the search for doubly charged Higgs boson.

Bernardi, Gregorio; /Paris U., VI-VII /Fermilab

2005-07-01T23:59:59.000Z

434

The D0 level 3 DAQ system: operation and upgrades  

Science Conference Proceedings (OSTI)

The D{O} Level 3 data acquisition system for Run II of the Tevatron has been reliably operating since May 2002. Designed to handle average event sizes of 250 kilobytes at a rate of 1 kHz, the system has been upgraded to be able to process more events, doubling its typical output rate from 50 Hz to 100 Hz, while coping with higher event sizes at the beginning of high luminosity collider stores. The system routes and transfers event fragments from 63 VME crates to any of approximately 320 processing nodes. The addition of more farm nodes, the performance of the components, and the running experience are described here.

Garcia-Bellido, Aran; Bose, Tulika; Brooijmans, Gustaaf; Chapin, Doug; Cutts, David; Fuess, Stuart; Gadfort, Thomas; Haas, Andrew; Lee, William; Rechenmacher, Ron; Snyder, Scott; /Washington U., Seattle /Brown U. /Columbia U. /Fermilab /Brookhaven

2007-05-01T23:59:59.000Z

435

Upgrade of the JET far infrared interferometer diagnostic  

Science Conference Proceedings (OSTI)

In recent years there has been a major upgrade of the JET far infrared diagnostic system consisting of a new laser system with the wavelength at 118.8 {mu}m at and more advanced processing electronics for phase counting. This provides a second colour measurement of the electron plasma density on the vertical system. Due to the shorter wavelength, the plasma induced laser beam refraction is reduced by a factor of three alleviating density errors caused by loss of signal (so-called 'fringe jumps'[A. Murari et al., Rev. Sci. Instrum. 77, 073505 (2006)]), in particular during high performance plasmas experiments in JET.

Boboc, A.; Edlington, T.; Dorling, S. [EURATOM/CCFE Association, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Gil, C.; Pastor, P.; Spuig, P. [CEA, IRFM, Cadarache F-13108 Saint-Paul-Lez-Durance (France); Collaboration: JET-EFDA Contributors

2012-10-15T23:59:59.000Z

436

The Removal of Heavy Metals and Upgrading Crude Bio-oil from ...  

Science Conference Proceedings (OSTI)

As a potential method to detoxify the biomass and to convert this material to a suitable bio-energy resource, the hydrothermal upgrading process was applied to ...

437

Microsoft Word - CX-2010 Control House Seismic Upgrades_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and non-structural seismic upgrades, and perform minor architectural work at each substation. Findings: BPA has determined that the proposed action complies with Section...

438

Biogas upgrade through exhaust gas reforming process for use in CI engines.  

E-Print Network (OSTI)

??Biogas is not ideal for combustion in diesel engines mainly due to its low energy content. The upgrading of biogas into high quality syngas through… (more)

Lau, Chia Sheng

2012-01-01T23:59:59.000Z

439

Compilation of Results and Feedback Regarding Turbine Upgrades at Nuclear and Fossil Power Plants  

Science Conference Proceedings (OSTI)

This report compiles results and feedback and draws a number of conclusions and lessons learned regarding steam turbine generator upgrades at nuclear and fossil power plants.

2008-11-24T23:59:59.000Z

440

Preparation and characterization of nanostructured metal oxides for application to biomass upgrading.  

E-Print Network (OSTI)

??Pyrolysis oil, or bio-oil, is one of the most promising methods to upgrade a variety of biomass to transportation fuels. Moving toward a more "green"… (more)

Finch, Kenneth B. H.

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Upgrading California's Home Care Workforce: The Impact of Political Action and Unionization  

E-Print Network (OSTI)

howes / upgrading california’s home care workforceKlein. 2003. “Organizing Home Care: Homecare Workers, OldCollaborating to Improve In-Home Supportive Services: Stake-

Howes, Candace

2004-01-01T23:59:59.000Z

442

Uppgradering av biogas med aska frĺn trädbränslen; Upgrading of biogas using ash from wood fuels.  

E-Print Network (OSTI)

?? The Swedish production of biogas was 1,5 TWh 2011. About half of the production was used as vehicle fuels. The cost for upgrading biogas… (more)

Andersson, Johan

2013-01-01T23:59:59.000Z

443

STANDARDIZATION OF CEBAF 12 GEV UPGRADE CAVITY TESTING  

SciTech Connect

CEBAF 12GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. Each cavity underwent RF qualification at 2.07K using a high power accelerating gradient test and an HOM survey in Jefferson Lab's Vertical Testing Area (VTA) before cavity string assembly. In order to ensure consistently high quality data, updated cavity testing procedures and analysis were implemented and used by a group of VTA operators. For high power tests, a cavity testing procedure was developed and used in conjunction with a LabVIEW program to collect the test data. Additionally while the cavity was at 2.07K, an HOM survey was performed using a network analyzer and a combination of Excel and Mathematica programs. Data analysis was standardized and an online logbook, Pansophy, was used for data storage and mining. The Pansophy system allowed test results to be easily summarized and searchable across all cavity tests. In this presentation, the CEBAF 12GeV upgrade cavity testing procedure, method for data analysis, and results reporting results will be discussed.

Tiffany Bass, G. Davis, Christiana Wilson, Mircea Stirbet

2012-07-01T23:59:59.000Z

444

Tevatron energy and luminosity upgrades beyond the main injector  

E-Print Network (OSTI)

The Fermilab Tevatron will be the world's highest energy hadron collider until the LHC is commissioned, it has the world's highest energy fixed target beams, and Fermilab will be the leading high energy physics laboratory in the US for the foreseeable future. Following the demise of the SSC, a number of possible upgrades to the Tevatron complex, beyond construction of the Main Injector, are being discussed. Using existing technology, it appears possible to increase the luminosity of the \\bar{p}p Collider to at least 10^{33}cm^{-2}sec^{-1} (Tevatron-Star) and to increase the beam energy to 2 TeV (DiTevatron). Fixed target beam of energy about 1.5 TeV could also be delivered. Leaving the existing Tevatron in the tunnel and constructing bypasses around the collider halls would allow simultaneous 800 GeV fixed target and \\sqrt{s} = 4 TeV collider operation. These upgrades would give Fermilab an exciting physics program which would be complementary to the LHC, and they would lay the groundwork for the construction...

Amidei, D; Foster, G W; Jackson, G P; Kamon, T; López, J L; McIntyre, P; Strait, J B; White, J

1996-01-01T23:59:59.000Z

445

THERMAL UPGRADING OF 9977 RADIOACTIVE MATERIAL (RAM) TYPE B PACKAGE  

Science Conference Proceedings (OSTI)

The 9977 package is a radioactive material package that was originally certified to ship Heat Sources and RTG contents up to 19 watts and it is now being reviewed to significantly expand its contents in support of additional DOE missions. Thermal upgrading will be accomplished by employing stacked 3013 containers, a 3013 aluminum spacer and an external aluminum sleeve for enhanced heat transfer. The 7th Addendum to the original 9977 package Safety Basis Report describing these modifications is under review for the DOE certification. The analyses described in this paper show that this well-designed and conservatively analyzed package can be upgraded to carry contents with decay heat up to 38 watts with some simple design modifications. The Model 9977 package has been designed as a replacement for the Department of Transportation (DOT) Fissile Specification 6M package. The 9977 package is a very versatile Type B package which is certified to transport and store a wide spectrum of radioactive materials. The package was analyzed quite conservatively to increase its usefulness and store different payload configurations. Its versatility is evident from several daughter packages such as the 9978 and H1700, and several addendums where the payloads have been modified to suit the Shipper's needs without additional testing.

Gupta, N.; Abramczyk, G.

2012-03-26T23:59:59.000Z

446

RF Power Upgrade for CEBAF at Jefferson Laboratory  

Science Conference Proceedings (OSTI)

Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

Andrew Kimber,Richard Nelson

2011-03-01T23:59:59.000Z

447

12 GeV Upgrade Project - Cryomodule Production  

Science Conference Proceedings (OSTI)

The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

2012-07-01T23:59:59.000Z

448

Staff Analysis of Proposed Modifications to Upgrade Three Combustion  

E-Print Network (OSTI)

Procter and Gamble Cogeneration Project. Staff prepared an analysis of this proposed change, and a copy is enclosed for your information and review. The Procter and Gamble project is a 164 MW cogeneration power plant located in the City of Sacramento in Sacramento County. The project was certified by the Energy Commission on November 16, 1994, and began commercial operation in 1996. The proposed modifications will allow SCA to upgrade the two LM6000PA combustion turbines to LM6000PCs. Additionally, Spray Intercooled Turbine and Enhanced Flow and Speed (Sprint/EFS) technology will be added to all three turbines. These upgrades are anticipated to lower the combustion turbines ’ air pollutant emissions and raise thermal efficiency. Overall facility output is expected to increase by 22 MW (nominal). Energy Commission staff reviewed the petition and assessed the impacts of this proposal on environmental quality, public health and safety, and proposes revisions to seven conditions of certification: AQ-10 through AQ-14, AQ-16, and AQ-39. In addition, AQ-15 would be deleted, and AQ-50 through AQ-51 added to the current conditions of certification. Three analyses were prepared by technical staff, and are attached to this

Paula David

2008-01-01T23:59:59.000Z

449

Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems  

E-Print Network (OSTI)

In the 1990's, many organizations are attempting to do more, faster, with less cost and improved quality. In many cases, this involves improving the efficiency of their systems. Increased competition is creating pressure to continuously improve in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return on investment to the owner in several years, through energy and demand savings, Power Utility rebates, maintenance savings and increased productivity, however, the initial capital expense required is cost prohibitive. Budget constraints, a lengthy and complicated approval process and large up-front capital requirements are only a few "road blocks" to improvement. In order to make an equipment acquisition, every company must consider how they will pay for it! How do companies acquire the equipment they need to be more competitive? One cost effective solution -FINANCING! There are numerous benefits to both the end user customer (Lessee) and the installing contractor from utilizing financing to upgrade or retrofit to energy efficient systems. It is possible to provide design, material, installation, maintenance and soft costs as well as positive cash flow to the end user by structuring financing terms and payments around the energy savings. A wide array of programs and services are offered by many different financial organizations.

Ertle, J. M.

1994-04-01T23:59:59.000Z

450

ECE RADIOMETER UPGRADE ON THE DIII-D TOKAMAK  

SciTech Connect

OAK A271 ECE RADIOMETER UPGRADE ON THE DIII-D TOKAMAK. The electron cyclotron emission (ECE) heterodyne radiometer diagnostic on DIII-D has been upgraded with the addition of eight channels for a total of 40. The new, higher frequency channels allow measurements of electron temperature into the magnetic axis in discharges at maximum field, 2.15 T. The complete set now extends over the full usable range of second harmonic emission frequencies at 2.0 T covering radii from the outer edge inward to the location of third harmonic overlap on the high field side. Full coverage permits the measurement of heat pulses and magnetohydrodynamic (MHD) fluctuations on both sides of the magnetic axis. In addition, the symmetric measurements are used to fix the location of the magnetic axis in tokamak magnetic equilibrium reconstructions. Also, the new higher frequency channels have been used to determine central T{sub e} with good time resolution in low field, high density discharges using third harmonic ECE in the optically gray and optically thick regimes.

AUSTIN, ME; LOHR, J

2002-08-01T23:59:59.000Z

451

Systems integration and upgrade of an Engineering Flight Simulator  

E-Print Network (OSTI)

This thesis presents the system integration and upgrade of the Texas A&M Flight Mechanics Laboratory Engineering Flight Simulator (EFS). This upgrade replaced the previous EFS, a simplistic design that did not resemble an aircraft cockpit or present the pilot with a visual environment adequate for basic flight maneuvers. The EFS goals included: increased field of view for scenery generation, enlarging and improving the cockpit environment, providing a rudimentary cockpit control loader and developing a reliable, portable, data acquisition system. Two head down displays, surrounded by buttons, are installed in a T-37 military trainer cockpit. A digital aircraft configuration indicator completes the instrument panel. Optical encoders monitor all cockpit control effectors connected to a control loader providing a linear stick force gradient and 12 lbs. maximum force. A serial based data acquisition system records all parameters and is compatible with all foreseeable computing platforms. A projector frame, mounts three projectors displaying information from a Silicon Graphics Inc. computer yielding a 148? field of view on three eight foot wide screens. The system provides a significant research tool for testing and evaluation of the General Aviation Pilot Advisor and Training System, a fuzzy logic based pilot advisory system.

Alcorn, William Pleasant

2002-01-01T23:59:59.000Z

452

Tevatron energy and luminosity upgrades beyond the Main Injector  

E-Print Network (OSTI)

The Fermilab Tevatron will be the world's highest energy hadron collider until the LHC is commissioned, it has the world's highest energy fixed target beams, and Fermilab will be the leading high energy physics laboratory in the US for the foreseeable future. Following the demise of the SSC, a number of possible upgrades to the Tevatron complex, beyond construction of the Main Injector, are being discussed. Using existing technology, it appears possible to increase the luminosity of the $\\bar{p}p$ Collider to at least $10^{33}$cm$^{-2}$sec$^{-1}$ (Tevatron-Star) and to increase the beam energy to 2 TeV (DiTevatron). Fixed target beam of energy about 1.5 TeV could also be delivered. Leaving the existing Tevatron in the tunnel and constructing bypasses around the collider halls would allow simultaneous 800 GeV fixed target and $\\sqrt{s}$ = 4 TeV collider operation. These upgrades would give Fermilab an exciting physics program which would be complementary to the LHC, and they would lay the groundwork for the construction of a possible post-LHC ultra-high energy hadron collider. (Presented at the Eighth Meeting of the Division of Particles and Fields Albuquerque, New Mexico, August 2-6, 1994.)

D. Amidei; A. Baden; G. Foster; G. Jackson; T. Kamon; J. Lopez; P. McIntyre; J. Strait; J. White

1994-08-20T23:59:59.000Z

453

Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2006 31, 2006 New Facility Will Test Disposal Cell Cover Renovation New Facility Will Test Disposal Cell Cover Renovation November 20, 2006 EA-1456: Finding of No Signficant Impact Cheyenne-Miracle Mile and Ault-Cheyanne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado September 1, 2006 EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming and Weld County, Colorado November 16, 2005 EA-1508: Finding of No Significant Impact Beaver Creek-Hoyt-Erie 115-kV Transmission Line Upgrade, Morgan and Weld Counties, Colorado November 1, 2005 EA-1508: Mitigation Action Plan Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld

454

Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.  

Science Conference Proceedings (OSTI)

Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

United States. Bonneville Power Administration.

1991-09-01T23:59:59.000Z

455

CEBAF UPGRADE CRYOMODULE COMPONENT TESTING IN THE HORIZONTAL TEST BED (HTB)*  

E-Print Network (OSTI)

CEBAF UPGRADE CRYOMODULE COMPONENT TESTING IN THE HORIZONTAL TEST BED (HTB)* I. E. Campisi , B The planned upgrade of the CEBAF electron accelerator includes the development of an improved cryomodule. Several components differ substantially from the original CEBAF cryomodule; these include: the new 7-cell

456

DEVELOPMENT AND TESTING OF A PROTOTYPE TUNER FOR THE CEBAF UPGRADE CRYOMODULE*  

E-Print Network (OSTI)

DEVELOPMENT AND TESTING OF A PROTOTYPE TUNER FOR THE CEBAF UPGRADE CRYOMODULE* G. Davis , J developed for CEBAF at Jefferson Lab. The high-gradient, low-current operation of the superconductingHz and resolution of 1Hz that will be used during normal operation [1]. Fig. 1: CEBAF Upgrade Tuner 2 MECHANICAL

457

A Forward Silicon Strip System for the ATLAS HL-LHC Upgrade  

E-Print Network (OSTI)

The LHC is successfully accumulating luminosity at a centre-of-mass energy of 8 TeV this year. At the same time, plans are rapidly progressing for a series of upgrades, culminating roughly eight years from now in the High Luminosity LHC (HL-LHC) project. The HL-LHC is expected to deliver approximately five times the LHC nominal instantaneous luminosity, resulting in a total integrated luminosity of around 3000 fb-1 by 2030. The ATLAS experiment has a rather well advanced plan to build and install a completely new Inner Tracker (IT) system entirely based on silicon detectors by 2020. This new IT will be made from several pixel and strip layers. The silicon strip detector system will consist of single-sided p-type detectors with five barrel layers and six endcap (EC) disks on each forward side. Each disk will consist of 32 trapezoidal objects dubbed “petals”, with all services (cooling, read-out, command lines, LV and HV power) integrated into the petal. Each petal will contain 18 silicon sensors grouped in...

Wonsak, S; The ATLAS collaboration

2012-01-01T23:59:59.000Z

458

Conceptual design report, 219-S secondary containment upgrade, Project W-178  

Science Conference Proceedings (OSTI)

The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000.

Beyer, J.J. [Kaiser Engineers Hanford Co., Richland, WA (United States)

1993-05-01T23:59:59.000Z

459

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program  

Science Conference Proceedings (OSTI)

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

Johnson, Justin; Smith, Cale; Young, Mike; Donohoo, Ken; Owen, Ross; Clark, Eddit; Espejo, Raul; Aivaliotis, Sandy; Stelmak, Ron; Mohr, Ron; Barba, Cristian; Gonzalez, Guillermo; Malkin, Stuart; Dimitrova, Vessela; Ragsdale, Gary; Mitchem, Sean; Jeirath, Nakul; Loomis, Joe; Trevino, Gerardo; Syracuse, Steve; Hurst, Neil; Mereness, Matt; Johnson, Chad; Bivens, Carrie

2013-05-04T23:59:59.000Z

460

EA-1321: Proposed Upgrade and Improvement of The National Synchrotron Light  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21: Proposed Upgrade and Improvement of The National 21: Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York EA-1321: Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York SUMMARY This EA evaluates the environmental impacts for the proposal to upgrade the facilities of the U.S. Department of Energy's National Synchrotron Light Source Complex, namely the National Synchrotron Light Source, the Accelerator Test Facility and the Source Development Laboratory. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 12, 2001 EA-1321: Finding of No Significant Impact Proposed Upgrade and Improvement of The National Synchrotron Light Source

Note: This page contains sample records for the topic "line rebuild upgrade" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Rebates Cut the Price of Big-Time Efficiency Upgrades | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades February 22, 2010 - 5:52pm Addthis One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy's rebate programs that cut the cost of whole-house energy efficiency upgrades. It can start with a visit from the "Home Energy Squad", a program offered jointly by Xcel Energy and CenterPoint Energy, the local energy providers (NEC implements the program for Xcel Energy). The Energy Squad installs simple efficiency-improving products such as compact fluorescent

462

Calibrating transport lines using LOCO techniques  

Science Conference Proceedings (OSTI)

With the 12GeV upgrade underway at CEBAF, there is a need to re-characterize the beamlines after the modifications made to it to accommodate running at higher energies. We present a linear perturbation approach to calibrating the optics model of transport lines. This method is adapted from the LOCO method in use for storage rings. We consider the effect of quadrupole errors, dipole construction errors as well as beam position monitors and correctors calibrations. The ideal model is expanded to first order in Taylor series of the quadrupole errors. A set of difference orbits obtained by exciting the correctors along the beamline is taken, yielding the measured response matrix. An iterative procedure is invoked and the quadrupole errors as well as beam position monitors and corrector calibration factors are obtained. Here we present details of the method and results of first measurements at CEBAF in early 2011.

Yves Roblin

2011-09-01T23:59:59.000Z

463

Energy Star Building Upgrade Manual Retrocommissioning Chapter 5  

NLE Websites -- All DOE Office Websites (Extended Search)

5. Retrocommissioning 5. Retrocommissioning Revised October 2007 5. Overview 2 Energy and Non-energy Benefits 3 5.2 Project Planning 5 Selecting a Project 5 Benchmarking 5 Selecting a Provider and Team 6 Developing a Scope of Work 7 5.3 Project Execution 7 Implementing the Recommendations 8 Maintaining the Benefits 9 Planning for Recommissioning 10 5.4 Tune-up Opportunities  Lighting 11 Supplemental Loads 12 Distribution Systems 13 Heating and Cooling Systems 14 5.5 Summary 6 Bibliography 7 Glossary G- ENERGY STAR ® Building Manual 2 5. Retrocommissioning 5. Overview Retrocommissioning is the first stage in the building upgrade process. The staged approach accounts for the interactions among all the energy flows in a building (Figure 5.1) and pro-

464

Boiler Upgrades Save Money & Energy: Boeing Philadelphia  

NLE Websites -- All DOE Office Websites (Extended Search)

Boeing Philadelphia Boeing Philadelphia The Boeing Company, headquartered in the U.S., is the world's largest aerospace company and is a leading manufacturer of commercial jetliners and defense, space, and security systems. The company controls over 84 million square feet of facilities enterprise-wide and employs over 159,000. Through its partnership with ENERGY STAR, Boeing has refined its corporate-wide energy management program. As a result, Boeing has been able to strengthen energy management across its sites, including the Philadelphia plant where the company produces the H-47 Chinook Helicopter. Increases in production prompted Boeing to undertake a project to upgrade 223,000 square feet of factory. The planned major retrofit afforded the opportunity to look holistically at energy use at the site, and

465

Microsoft PowerPoint - ATLAS_upgrade_physics_program  

NLE Websites -- All DOE Office Websites (Extended Search)

Guy Savard Guy Savard Argonne National Laboratory and University of Chicago Science with the ATLAS Efficiency and Intensity Upgrade ATLAS Users Meeting August 8-9 2009 2 G. Savard 2009 ATLAS S&T Review May 18-19, 2009 Outline Evolving landscape for low-energy nuclear physics Self-assessment of ATLAS present and near future program Process followed to evaluate near and longer term physics program needs and role in community Option proposed - Physics - Machine - Instrumentation 3 G. Savard 2009 ATLAS S&T Review May 18-19, 2009 The new landscape: what is coming to a town near us ---- FRIB ---- At full power - Fast beams - Reaccelerated beams at a few % of that Starts operating ~ 2017-18

466

Microsoft Word - Noxon Radio Station Upgrade CX.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2011 5, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Noxon Radio Station Upgrade Project Budget Information: Work Order # 00254987 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Sanders County, Montana - Section 33, Township 26 North, Range 32 West of the Noxon Rapids Dam Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace the existing building at Noxon Radio Station with a new 650 square foot building. The existing building, especially the floor, is deteriorating

467

Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade  

SciTech Connect

The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and low residual stresses. The products fabricated are used on multiple programs.

Josh A. Salmond

2009-08-07T23:59:59.000Z

468

Avoiding Distribution System Upgrade Costs Using Distributed Generation  

Science Conference Proceedings (OSTI)

PNNL, in cooperation with three utilities, developed a database and methodology to analyze and characterize the avoided costs of Distributed Generation (DG) deployment as an alternative to traditional distribution system investment. After applying a number of screening criteria to the initial set of 307 cases, eighteen were selected for detailed analysis. Alternative DG investment scenarios were developed for these cases to permit capital, operation, maintenance, and fuel costs to be identified and incorporated into the analysis. The “customer-owned” backup power generator option was also investigated. The results of the analysis of the 18 cases show that none yielded cost savings under the alternative DG scenarios. However, the DG alternative systems were configured using very restrictive assumptions concerning reliability, peak rating, engine types and acceptable fuel. In particular it was assumed that the DG alternative in each case must meet the reliability required of conventional distribution systems (99.91% reliability). The analysis was further constrained by a requirement that each substation meet the demands placed upon it by a one in three weather occurrence. To determine if, by relaxing these requirements, the DG alternative might be more viable, one project was re-examined. The 99.91% reliability factor was still assumed for normal operating conditions but redundancy required to maintain reliability was relaxed for the relatively few hours every three years where extreme weather caused load to exceed present substation capacity. This resulted in the deferment of capital investment until later years and reduced the number of engines required for the project. The cost of both the conventional and DG alternative also dropped because the centralized power generation, variable O&M, and DG fuels costs were calculated based on present load requirements in combination with long-term forecasts of load growth, as opposed to load requirements plus a buffer based on predictions of extraordinary weather conditions. Application of the relaxed set of assumptions reduced the total cost of the DG alternative by roughly 57 percent from $7.0 million to $3.0 million. The reduction, however, did not change the overall result of the analysis, as the cost of the conventional distribution system upgrade alternative remained lower at $1.7 million. This paper also explores the feasibility of using a system of backup generators to defer investment in distribution system infrastructure. Rather than expanding substation capacity at substations experiencing slow load growth rates, PNNL considered a scenario where diesel generators were installed on location at customers participating in a program designed to offer additional power security and reliability to the customer and connection to the grid. The backup generators, in turn, could be used to meet peak demand for a limited number of hours each year, thus deferring distribution system investment. Data from an existing program at one of the three participating utilities was used to quantify the costs associated with the backup generator scenario. The results of the “customer owned” backup power generator analysis showed that in all cases the nominal cost of the DG scenario is more than the nominal cost of the base-case conventional distribution system upgrade scenario. However, in two of the cases the total present value costs of the alternative backup generator scenarios were between 15 and 22% less than those for the conventional scenarios. Overall, the results of the study offer considerable encouragement that the use of DG systems can defer conventional distribution system upgrades under the right conditions and when the DG configurations are intelligently designed. Using existing customer-owned DG to defer distribution system upgrades appears to be an immediate commercially-viable opportunity.

Schienbein, Lawrence A.; Balducci, Patrick J.; Nguyen, Tony B.; Brown, Daryl R.; DeSteese, John G.; Speer, Gregory A.

2004-01-20T23:59:59.000Z

469

Network Upgrade for the SLC: PEP II Network  

SciTech Connect

The PEP-II control system required a new network to support the system functions. This network, called CTLnet, is an FDDI/Ethernet based network using only TCP/IP protocols. An upgrade of the SLC Control System micro communications to use TCP/IP and SLCNET would allow all PEP-II control system nodes to use TCP/IP. CTLnet is private and separate from the SLAC public network. Access to nodes and control system functions is provided by multi-homed application servers with connections to both the private CTLnet and the SLAC public network. Monitoring and diagnostics are provided using a dedicated system. Future plans and current status information is included.

Crane, M.; Call, M.; Clark, S.; Coffman, F.; Himel, T.; Lahey, T.; Miller, E.; Sass, R.; /SLAC