Switchyards Rebuild and Upgrade Project in Mohave County, Arizona  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

. . Categorical Exclusion for the Demolition of a Service Building at Davis Dam Lower 230-kV Switchyard as part of the Overall Switchyards Rebuild and Upgrade Project in Mohave County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western Area Power Administration (Western) plans to demolish a service building located in the Lower 230-kV Switchyard at Davis Dam, because it no longer meets our needs and we do not anticipate finding a use for it in the future. The building is currently vacant and has been for years. We plan to begin the work on April 1 ,2011 and complete it by December 31,2011. The attached map shows the project area location. Aerial photographs show that much of this area is developed. Western owns the land. The legal description is

2

Gila to North Gila Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Western proposes to rebuild and upgrade two, parallel, 4.8-mile-long transmission lines located between Gila and North Gila Substations and take land actions...

3

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

4

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

5

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion,...

6

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

7

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

8

EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41: Mohave County Wind Farm Project, Mohave County, Arizona 41: Mohave County Wind Farm Project, Mohave County, Arizona EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona Summary This EIS, prepared by the Bureau of Land Management with DOE's Western Area Power Administration as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western's transmission lines.The project website is http://www.blm.gov/az/st/en/prog/energy/wind/mohave.html. Public Comment Opportunities None available at this time. Documents Available for Download Draft EIS posted at http://www.blm.gov/az/st/en/prog/energy/wind/mohave/reports/DEIS.html.

9

DOE/EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEEA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon DOEEA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary...

10

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

11

Libby-Troy Line Rebuild Project - July 25, 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

12

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

13

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville...

14

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...

15

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties,...

16

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln  

NLE Websites -- All DOE Office Websites (Extended Search)

50: Grand Coulee-Creston Transmission Line Rebuild; Grant and 50: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington SUMMARY Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of approximately 28 miles of transmission line between the cities of Coulee Dam in Grant County and Creston in Lincoln County, Washington. The proposed project would include replacing all wood pole structures and conductor, improving existing access roads, and developing temporary access roads. Additional information is available at the project website: http://www.bpa.gov/goto/CouleeCrestonRebuild. PUBLIC COMMENT OPPORTUNITIES Draft EA: Comment Period Ends 2/3/14.

17

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

18

EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

This EIS, prepared by the Bureau of Land Management with DOE’s Western Area Power Administration as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western’s transmission lines.

19

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

20

EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17: Lovell-Yellowtail and Basin-Lovell Transmission Line 17: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana Summary DOE's Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Mohave Solar Power Plant | Open Energy Information  

Open Energy Info (EERE)

Mohave Solar Power Plant Mohave Solar Power Plant Facility Mojave Solar Sector Solar Facility Type Concentrating Solar Power Facility Status Under Construction Owner Mojave Solar LLC, Developer Abengoa Solar, Mohave Sun LLC Location Mohave County, Arizona Coordinates 35.017264°, -117.316607° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.017264,"lon":-117.316607,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

22

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

23

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Appendices  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Appendices Grand County, Colorado June 2013 Appendix A EIS Scoping Report GRANBY PUMPING PLANT - WINDY GAP TRANSMISSION LINE REBUILD PROJECT ENVIRONMENTAL IMPACT STATEMENT SCOPING SUMMARY REPORT December 4, 2007

24

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 23.90-mile Salem-Albany No. 1 and 27.85-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

25

DOE/EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

26

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

27

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

28

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 34-mile Midway-Moxee transmission line in Benton and Yakima Counties, Washington.

29

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

30

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

31

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO  

Energy.gov (U.S. Department of Energy (DOE))

DOE’s Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support its decision on whether to grant a Special Use Permit for parts of the transmission line located on National Forest lands.

32

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona

33

Mohave Electric Cooperative - Renewable Energy Incentive Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Savings Mohave Electric Cooperative - Renewable Energy Incentive Program Mohave Electric Cooperative - Renewable Energy Incentive Program...

34

Granby Pumping Plant Switchyard - Windy Gap Substation Transmission Line Rebuild, Grand County, Colorado: Final Environmental Impact Statement Executive Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PUMPING PLANT SWITCHYARD - WINDY GAP PUMPING PLANT SWITCHYARD - WINDY GAP SUBSTATION TRANSMISSION LINE REBUILD, GRAND COUNTY, COLORADO DOE/EIS-0400 Final Environmental Impact Statement Executive Summary Grand County, Colorado June 2013 Granby Pumping Plant-Windy Gap Substation Transmission Line Rebuild Project FEIS Executive Summary ES-1 EXECUTIVE SUMMARY Introduction Western Area Power Administration (Western), a power marketing administration within the U.S. Department of Energy (DOE), is proposing to rebuild and upgrade the Granby Pumping Plant Switchyard-Windy Gap Substation transmission line in Grand County, Colorado (Grand County). This Environmental Impact Statement (EIS) analyzes the impacts associated with the proposal to remove approximately 13.6 miles of 69-kilovolt (kV) transmission line, construct approximately

35

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

36

Environmental quandary shuts Mohave plants  

SciTech Connect

The 1,580 MW coal-fired Mohave Generating Station in Laughlin, NV was closed on 31 December 2005 and is expected to be closed for four years whilst the owners Southern California Edison sort out battles over the plant's pollutant emissions and negotiate with two native tribes over rights to the water needed to deliver fuel to Mohave as a slurry. The plant was forced to close because it was unable to comply with a 1999 court order to reduce emissions of sulphur dioxide, nitrogen oxides and particulates. 1 photo.

NONE

2006-03-15T23:59:59.000Z

37

EA-1931: Keeler-Forest Grove, Forest Grove-Tillamook Line No. 1 Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA will evaluate the potential environmental impacts of a BPA proposal to rebuild its 58 mile long, 115 kilovolt (kV) wood pole Keeler-Forest Grove and Forest Grove-Tillamook transmission lines. The deteriorated transmission line structures (wood pole structures, switches, cross arms, braces, guys, anchors, insulator assemblies and conductor) need to be replaced in order to maintain reliable electrical service, avoid risks to the public, and ensure worker safety.

38

DOE/EA-1342: Shelton-Kitsap Transmission Line Rebuild Final Environmental Assessment and Finding of No Significant Impact (01/17/01)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A N U A R Y 2 0 0 1 A N U A R Y 2 0 0 1 SHELTON-KITSAP TRANSMISSION LINE REBUILD Final Environmental Assessment and Finding of No Significant Impact DOE/EA-1342 DEPARTMENT OF ENERGY Bonneville Power Administration Shelton-Kitsap Transmission Line Rebuild Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings. Summary: This notice announces Bonneville Power Administration's (BPA) proposal to rebuild its existing Shelton-Kitsap No. 2 115-kilovolt (kV) transmission line as a double-circuit 230-kV line in the existing right-of-way, in order to improve system capability and reliability. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1342) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major

39

Mohave Sun Power LLC | Open Energy Information  

Open Energy Info (EERE)

Sun Power LLC Sun Power LLC Jump to: navigation, search Name Mohave Sun Power LLC Place Cambridge, Massachusetts Zip 2139 Sector Solar Product Project developer with solar interests in US Southwest Coordinates 43.003745°, -89.017499° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.003745,"lon":-89.017499,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

40

Mohave County, Arizona: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Mohave County, Arizona: Energy Resources Mohave County, Arizona: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.2143346°, -113.7632828° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.2143346,"lon":-113.7632828,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade...

42

Mohave Electric Cooperative, Inc | Open Energy Information  

Open Energy Info (EERE)

Mohave Electric Cooperative, Inc Mohave Electric Cooperative, Inc Jump to: navigation, search Name Mohave Electric Cooperative, Inc Place Arizona Utility Id 21538 Utility Location Yes Ownership C NERC Location WECC Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png LS (100 W HPS Cooperative Owned-50 kWh Per Month) Lighting LS (100 W HPS Customer Owned-50 kWh Per Month) Lighting LS (175 W MVL Cooperative Owned-100kWh Per Month) Lighting LS (175 W MVL Customer Owned-100 kWh Per Month) Lighting LS (250 W HPS Cooperative Owned-129 kWh Per Month) Lighting

43

Mohave Electric Cooperative - Heat Pump Rebate Program | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heat Pump Rebate Program Mohave Electric Cooperative - Heat Pump Rebate Program Eligibility Residential Savings For Heating & Cooling Commercial Heating & Cooling Heat Pumps...

44

DOE/EA-1508: Environmental Assessment for the Beaver Creek-Hoyt-Erie Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BC-HT-EE Mitigation Action Plan Nov. 2005 1 BC-HT-EE Mitigation Action Plan Nov. 2005 1 Mitigation Action Plan To Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 BC-HT-EE Mitigation Action Plan Nov. 2005 2 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Construction Contractor Western Maintenance The contractor shall limit the movement of crews and equipment to the ROW, including access routes. The contractor shall limit movement on the ROW to minimize damage to residential yards, grazing land, crops, orchards, and property, and shall avoid marring the lands.

45

EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR 57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR Summary This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Public Comment Opportunities None available at this time. Documents Available for Download June 13, 2012 EIS-0457: Mitigation Action Plan Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Notice of Availability of a Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR

46

Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient Communities Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient Communities October 29, 2013 - 10:21am Addthis Workers repair power lines in the Mid-Atlantic shortly after Hurricane Sandy. | Photo courtesy of the Energy Department. Workers repair power lines in the Mid-Atlantic shortly after Hurricane Sandy. | Photo courtesy of the Energy Department. Dr. Ernest Moniz Dr. Ernest Moniz Secretary of Energy What are the key facts? This week marks the one-year anniversary of Hurricane Sandy making landfall in New Jersey. The federal government has been committed to the recovery and rebuilding efforts since day one, but much work remains. The Energy Department is taking actions to protect our energy

47

Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sandy One Year Later: Rebuilding Stronger, More Resilient Sandy One Year Later: Rebuilding Stronger, More Resilient Communities Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient Communities October 29, 2013 - 10:21am Addthis Workers repair power lines in the Mid-Atlantic shortly after Hurricane Sandy. | Photo courtesy of the Energy Department. Workers repair power lines in the Mid-Atlantic shortly after Hurricane Sandy. | Photo courtesy of the Energy Department. Dr. Ernest Moniz Dr. Ernest Moniz Secretary of Energy What are the key facts? This week marks the one-year anniversary of Hurricane Sandy making landfall in New Jersey. The federal government has been committed to the recovery and rebuilding efforts since day one, but much work remains. The Energy Department is taking actions to protect our energy

48

From: Mohave Sun Power <mohavesunpower@gmail.com>  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mohave Sun Power Mohave Sun Power <mohavesunpower@gmail.com> To: Date: 4/3/2009 5:12 PM Subject: public comments to Western Transmission Infrastructure Program Regarding Western's Transmission Infrastructure Program ("Program") for Recovery Act funding, we submit the following public comments. All of these comments are to better clarify the "Project Readiness" criteria critical to the Program's success. They are characteristics of projects that have a higher chance of getting financed with provisions of the Recovery Act: 1. We believe that Western should put a higher priority on projects that are already in a Western LGIP queue. The justification for this higher priority is that these projects have made substantial progress

49

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

50

EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Midway-Benton No. 1 Rebuild Project, near town of Desert Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA This EA evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild its existing Midway-Benton No.1 transmission line in place, or to reroute a portion of the Midway-Benton No. 1 transmission line that currently crosses Gable Mountain and Gable Butte in order to avoid crossing these features. Please note: Together, the Draft EA and the Revision to the Draft EA constitute the Final EA. EA-1912-DEA-2012.pdf EA-1912-RevisedDEA-2012.pdf More Documents & Publications EA-1912: Draft Environmental Assessment

51

EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1912: Midway-Benton No. 1 Rebuild Project, near town of Desert 1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA Summary This EA evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild its existing Midway-Benton No.1 transmission line in place, or to reroute a portion of the Midway-Benton No. 1 transmission line that currently crosses Gable Mountain and Gable Butte in order to avoid crossing these features. For more information, please see: http://efw.bpa.gov/environmental_services/Document_Library/MidwayBentonRebuild/ Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2012 EA-1912: Finding of No Significant Impact

52

"1. Mohave","Gas","Southern California Edison Co",1580 "2. Clark...  

U.S. Energy Information Administration (EIA) Indexed Site

Nevada" "1. Mohave","Gas","Southern California Edison Co",1580 "2. Clark","Gas","Nevada Power Co",1138 "3. Chuck Lenzie Generating Station","Gas","Nevada Power Co",1128 "4....

53

Grant Helps Efficiently Rebuild Ohio Infrastructure | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grant Helps Efficiently Rebuild Ohio Infrastructure Grant Helps Efficiently Rebuild Ohio Infrastructure February 22, 2010 - 11:12am Addthis Joshua DeLung What are the key facts?...

54

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana EIS-0379 - Rebuild of the Libby (FEC) to Troy Section of BPA's 115-kilovolt Transmission Line in Libby, Lincoln County, Montana Summary This Environmental Impact Statement (EIS) assesses the potential environmental impacts that would result from a proposed Department of Energy (DOE) action on the proposed rebuilding, operation, and maintenance of a 17-mile-long portion of BPA's Libby to Bonners Ferry 115-kilovolt (kV) Transmission Line in Lincoln County, Montana. The portion to be rebuilt would start at Flathead Electric Cooperative's (FEC) Libby Substation, in the town of Libby, Montana, and proceed west along an existing right-of-way for about 17 miles, terminating at BPA's Troy

55

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

NLE Websites -- All DOE Office Websites (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

56

EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

855: Creston-Bell Rebuild Project, Spokane and Lincoln 855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA Summary This EA (also known as DOE/EA-4406 or DOE/BP-4406) evaluates the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington. Additional information about this project is available on the BPA website. Public Comment Opportunities None available at this time. Documents Available for Download

57

Rebuilding It Better: City of Greensburg, Kansas, Business Incubator...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

47189.pdf More Documents & Publications Rebuilding It Better: City of Greensburg, Kansas, Business Incubator (Brochure) A Tale of Two Cities: Greensburg Rebuilds as a National...

58

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration's (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower's Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

59

Antelope-Fossil Rebuild Project : Environmental Assessment.  

SciTech Connect

The Columbia Power Cooperative Association (CPCA), Monument, Oregon, proposes to upgrade a 69-kV transmission line in Wasco and Wheeler Counties, Oregon, between the Antelope Substation and the Bonneville Power Administration`s (BPA) Fossil Substation. The project involves rebuilding and reconductoring 23.2 miles of transmission line, including modifying it for future use at 115 kV. Related project activities will include setting new wood pole structures, removing and disposing of old structures, conductors, and insulators, and stringing new conductor, all within the existing right-of-way. No new access roads will be required. A Borrower`s Environmental Report was prepared for the 1992--1993 Work Plan for Columbia Power Cooperative Association in March 1991. This report investigated cultural resources, threatened or endangered species, wetlands, and floodplains, and other environmental issues, and included correspondence with appropriate Federal, state, and local agencies. The report was submitted to the Rural Electrification Administration for their use in preparing their environmental documentation for the project.

United States. Bonneville Power Administration.

1992-04-01T23:59:59.000Z

60

Re-Building Greensburg | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Re-Building Greensburg Re-Building Greensburg Re-Building Greensburg Addthis Description Greensburg, KS - A town that was devastated by a tornado in 2007, yet came back to be one of the Nation's most energy-efficient, sustainable communities. Civic leaders and entrepreneurs helped rally residents behind the idea of "greening" Greensburg, inspiring the construction of numerous energy-efficient buildings, some of which generate their own renewable power with solar panels and wind turbines. Speakers Steve Hewitt, Daniel Wallach, Stephanie Peterson, Stacy Barnes Duration 4:09 Topic Energy Sources Consumption Energy Economy Emergency Response & Procedures Credit Energy Department Video STEVE HEWITT: In 2007 we had this massive tornado that came through Greensburg. STACY BARNES: Words can't even begin to describe what it was like to

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Rebuilding It Better: Greensburg, Kansas, High Performance Buildings...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE) Rebuilding It Better: Greensburg,...

62

Rebuilding It Better: Greensburg, Kansas, High Performance Buildings  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, High Performance Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE) Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE) This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. 53539.pdf More Documents & Publications From Tragedy to Triumph: Rebuilding Greensburg, Kansas To Be a 100% Renewable Energy City: Preprint Rebuilding It Better; BTI-Greensburg, John Deere Dealership (Brochure) (Revised) Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;

63

From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From Tragedy to Triumph - Rebuilding Green Buildings after From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) Fact sheet offering practical information about building energy efficient buildings and using renewable energy. Includes a checklist and resources. Highlights successful projects in Greensburg, Kansas. 45139.pdf More Documents & Publications Rebuilding It Better: Greensburg, Kansas. USD 422 Greensburg K-12 School (Revised) (Brochure), Energy Efficiency & Renewable Energy (EERE) Rebuilding It Better: Greensburg, Kansas. USD 422 Greensburg K-12 School (Revised) (Brochure), Energy Efficiency & Renewable Energy (EERE) Greensburg, Kansas: A Better, Greener Place to Live (Revised) (Brochure)

64

Mohave Valley, Arizona: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

330585°, -114.5888533° 330585°, -114.5888533° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.9330585,"lon":-114.5888533,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

65

From Tragedy to Triumph - Rebuilding Green Homes after Disaster (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From Tragedy to Triumph - Rebuilding Green Homes after Disaster From Tragedy to Triumph - Rebuilding Green Homes after Disaster (Revised) (Fact Sheet) From Tragedy to Triumph - Rebuilding Green Homes after Disaster (Revised) (Fact Sheet) These Greensburg fact sheet sheets help citizens understand what they can do as a part of the focus. Saving energy & water, using renewable energy (particular interest in small wind), driving "green", general sustainability, & living green. 45138.pdf More Documents & Publications From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 From Tragedy to Triumph - Rebuilding with Renewable Energy after Disaster,

66

Rebuilding it Better: Greensburg, Kansas, Kiowa County Memorial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

it Better: Greensburg, Kansas, Kiowa County Memorial Hospital (Brochure) (Revised) Rebuilding it Better: Greensburg, Kansas, Kiowa County Memorial Hospital (Brochure) (Revised)...

67

From Tragedy to Triumph - Rebuilding Green Buildings after Disaster...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Buildings after Disaster, EERE (Fact Sheet) From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet) Fact sheet offering practical information...

68

Rebuilding for Sustainability: Case Studies in the Making (Presentatio...  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy, operated by the Alliance for Sustainable Energy, LLC. Rebuilding for Sustainability: Case Studies in the Making SOLAR 2013 Lynn Billman, Senior Project Lead April 18,...

69

From Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be...  

Open Energy Info (EERE)

Availability Publicly available--Free Publication Date 8152010 Website http:apps1.eere.energy.govb Locality Greensburg, Kansas References From Tragedy to Triumph: Rebuilding...

70

Hurricane Sandy One Year Later: Rebuilding Stronger, More Resilient...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

those communities today, it is valuable to assess the lessons learned from this natural disaster so that we can rebuild stronger, more resilient communities that are better...

71

Rebuild America Partner Update, January--February 1999  

SciTech Connect

Rebuild America Partner Update, the bimonthly newsletter about the Rebuild America community, covers partnership activities, industry trends, and program news. Rebuild America is a network of community partnerships--made up of local governments and businesses--that save money by saving energy. These voluntary partnerships, working with the US Department of Energy, choose the best ways to improve the energy efficiency of commercial, government and apartment buildings. Rebuild America supports them with business and technical tools and customized assistance. By the year 2003, 250 Rebuild America partnerships will be involved in over 2 billion square feet of building renovations, which will save $650 million every year in energy costs, generate $3 billion in private community investment, create 26,000 new private sector jobs, and reduce air pollution by 1.6 million tons of carbon dioxide a year.

1999-01-01T23:59:59.000Z

72

Rebuilding After Disaster: Going Green from the Ground Up (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuilding After Disaster: Going Green from the Ground Up (Revised) Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) 20-page "how-to" guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster. 45136.pdf More Documents & Publications Greensburg Webinars Q&A From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE

73

Notice of Intent for the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line (DOE/EIS-0379) (05/05/05)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

56 56 Federal Register / Vol. 70, No. 86 / Thursday, May 5, 2005 / Notices Angeles to change between direct current and alternating current. This proposed converter station would be located in the vicinity of BPA's Port Angeles Substation in Clallam County, Washington, and would occupy from one to two acres. OC has proposed that the converter station be sited within the existing boundary of the Port Angeles Substation on property leased or otherwise transferred from BPA to OC. OC has proposed to begin construction of the HVDC transmission line and converter station by June 2006. Under this schedule, the HVDC system would be interconnected to the FCRTS in the fall of 2007, with a proposed operation date of December 2007. Once constructed, all existing land use and

74

Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital |  

Open Energy Info (EERE)

Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital Jump to: navigation, search Name Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital Agency/Company /Organization National Renewable Energy Laboratory Focus Area Agriculture, Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals Resource Type Case studies/examples Availability Publicly available--Free Publication Date 8/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, Kiowa County Memorial Hospital[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects

75

Kansas Business Rebuilds Greener After Destruction | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Business Rebuilds Greener After Destruction Business Rebuilds Greener After Destruction Kansas Business Rebuilds Greener After Destruction January 7, 2010 - 2:37pm Addthis Joshua DeLung What are the key facts? After 95 percent of Greensburg, Kan., was leveled by a tornado, a major dealership employing 1,500 Kansans rebuilds to achieve energy savings of nearly 50 percent over similar structures built to code. Ninety-five percent of Greensburg, Kan., was leveled by a tornado with 250-mile-per-hour winds in May 2007. One of the many businesses destroyed that spring was the Bucklin Tractor & Implement-Greensburg John Deere dealership, a component of the agricultural community that about 1,500 Kansans call home. The dealership owners, brothers Kelly and Mike Estes, knew the rebirth of their community depended greatly on access to farm equipment and services,

76

Rebuilding the American Auto Industry | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuilding the American Auto Industry Rebuilding the American Auto Industry Rebuilding the American Auto Industry December 8, 2011 - 3:40pm Addthis Rebuilding the American Auto Industry Dan Leistikow Dan Leistikow Former Director, Office of Public Affairs Three years ago, critics said that America's auto industry could not or should not be saved, and that our country should simply accept defeat and watch the industry collapse. The Administration refused to accept this proposition, and made strategic investments to help U.S. auto manufacturers weather the storm and retool to produce the hybrid, electric, and highly fuel efficient advanced vehicles of the future. With the help of these investments -- and the incredible talent and commitment of America's auto workers -- the auto industry is growing again.

77

Rebuilding It Better: Greensburg, Kansas, Business Incubator | Open Energy  

Open Energy Info (EERE)

Rebuilding It Better: Greensburg, Kansas, Business Incubator Rebuilding It Better: Greensburg, Kansas, Business Incubator Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Ground Source Heat Pumps, Solar, - Solar Pv, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals, Develop Finance and Implement Projects Resource Type Case studies/examples Availability Publicly available--Free Publication Date 4/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, Business Incubator [1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References Overview The city of Greensburg, Kansas, is rebuilding as a model green community

78

Working Together to Recover and Rebuild After Hurricane Sandy | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Working Together to Recover and Rebuild After Hurricane Sandy Working Together to Recover and Rebuild After Hurricane Sandy Working Together to Recover and Rebuild After Hurricane Sandy November 5, 2012 - 6:30pm Addthis Supervising Engineer for Public Service Electric and Gas Company, Michael Vincent, right, Department of Energy Secretary Steven Chu, center, and FEMA Deputy Administrator Rich Serino review power restoration at the Hoboken electrical substation. Restoration of power to communities impacted by Hurricane Sandy remains a high priority. | Photo by Jocelyn Augustino/FEMA. Supervising Engineer for Public Service Electric and Gas Company, Michael Vincent, right, Department of Energy Secretary Steven Chu, center, and FEMA Deputy Administrator Rich Serino review power restoration at the Hoboken electrical substation. Restoration of power to communities impacted by

79

Reducing Energy Costs and Rebuilding the Past | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reducing Energy Costs and Rebuilding the Past Reducing Energy Costs and Rebuilding the Past Reducing Energy Costs and Rebuilding the Past June 7, 2012 - 2:48pm Addthis Franklin County Courthouse (Before) 1 of 2 Franklin County Courthouse (Before) A court employee and news photographer survey the bomb damage in the Franklin County Courthouse's main courtroom in November 1969. Image: Courtesy of the Washington Missourian. Franklin County Courthouse (After) 2 of 2 Franklin County Courthouse (After) The fully restored main courtroom includes the original 1930s paint colors and reproduction lighting. Image: Sallie Glaize Franklin County, MO Chris Galm Marketing & Communications Specialist, Office of Energy Efficiency & Renewable Energy People across the country are looking for ways to make homes and buildings

80

Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy-Efficient Rebuilding After Tragedy: Inspiration from Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg, Kansas Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg, Kansas May 10, 2011 - 3:29pm Addthis Allison Casey Senior Communicator, NREL We discuss the weather a lot here on the Energy Savers Blog. It comes with the territory; seasonal temperature changes influence how we use energy in our homes. We also know that extreme weather can have big consequences; from health to finances to simple comfort, the weather has a huge effect on our daily lives. But one thing we don't discuss here very often is when weather turns tragic. Some areas of the country have seen a lot of terrible weather in recent weeks, with devastating tornadoes and now flooding hitting many states hard. Many people have lost friends and loved ones, and even more

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

How Would You Rebuild a Town - Green? | Open Energy Information  

Open Energy Info (EERE)

Would You Rebuild a Town - Green? Would You Rebuild a Town - Green? Jump to: navigation, search Name How Would You Rebuild a Town - Green? Agency/Company /Organization U.S. Department of Energy Partner Greensburg GreenTown, National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Goods and Materials - Materials, Energy Efficiency, People and Policy, Transportation, Biomass - Anaerobic Digestion, Biomass - Biofuels, Water Power, Solar, - Solar Pv, Wind Phase Bring the Right People Together, Create a Vision, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes Resource Type Case studies/examples Availability Publicly available--Free Publication Date 4/1/2009 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas

82

Rebuilding It Better: Greensburg, Kansas. Kiowa County Courthouse (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REBUILDING IT BETTER: GREENSBURG, KANSAS REBUILDING IT BETTER: GREENSBURG, KANSAS On May 4, 2007, a massive tornado destroyed or severely damaged 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable rural community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are working with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. Ultimately, these technologies could be replicated in other communities recovering from disaster. Kiowa County Courthouse Originally built in 1914, Kiowa County Courthouse is one of the few buildings that survived the force of the Greensburg tornado: 205-mile-per-hour winds that left a

83

Rebuilding After Disaster: Going Green from the Ground Up (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

After Disaster: Going Green from the Ground Up (Revised) After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE) 20-page "how-to" guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster. 45136.pdf More Documents & Publications From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE

84

Rebuilding It Better: Greensburg, Kansas, Kiowa County Courthouse | Open  

Open Energy Info (EERE)

Courthouse Courthouse Jump to: navigation, search Name Rebuilding It Better: Greensburg, Kansas, Kiowa County Courthouse Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Ground Source Heat Pumps, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals Resource Type Case studies/examples Availability Publicly available--Free Publication Date 4/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, Kiowa County Courthouse[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References Overview The city of Greensburg, Kansas, is rebuilding as a model green community

85

Working Together to Recover and Rebuild After Hurricane Sandy | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Working Together to Recover and Rebuild After Hurricane Sandy Working Together to Recover and Rebuild After Hurricane Sandy Working Together to Recover and Rebuild After Hurricane Sandy November 5, 2012 - 6:30pm Addthis Supervising Engineer for Public Service Electric and Gas Company, Michael Vincent, right, Department of Energy Secretary Steven Chu, center, and FEMA Deputy Administrator Rich Serino review power restoration at the Hoboken electrical substation. Restoration of power to communities impacted by Hurricane Sandy remains a high priority. | Photo by Jocelyn Augustino/FEMA. Supervising Engineer for Public Service Electric and Gas Company, Michael Vincent, right, Department of Energy Secretary Steven Chu, center, and FEMA Deputy Administrator Rich Serino review power restoration at the Hoboken electrical substation. Restoration of power to communities impacted by

86

Reducing Energy Costs and Rebuilding the Past | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reducing Energy Costs and Rebuilding the Past Reducing Energy Costs and Rebuilding the Past Reducing Energy Costs and Rebuilding the Past June 7, 2012 - 2:48pm Addthis Franklin County Courthouse (Before) 1 of 2 Franklin County Courthouse (Before) A court employee and news photographer survey the bomb damage in the Franklin County Courthouse's main courtroom in November 1969. Image: Courtesy of the Washington Missourian. Franklin County Courthouse (After) 2 of 2 Franklin County Courthouse (After) The fully restored main courtroom includes the original 1930s paint colors and reproduction lighting. Image: Sallie Glaize Franklin County, MO Chris Galm Marketing & Communications Specialist, Office of Energy Efficiency & Renewable Energy People across the country are looking for ways to make homes and buildings

87

Rebuilding It Better: Greensburg, Kansas, K-12 School | Open Energy  

Open Energy Info (EERE)

It Better: Greensburg, Kansas, K-12 School It Better: Greensburg, Kansas, K-12 School Jump to: navigation, search Name Rebuilding It Better: Greensburg, Kansas, K-12 School Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Ground Source Heat Pumps, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals Resource Type Case studies/examples Availability Publicly available--Free Publication Date 9/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, K-12 School[1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References Overview The city of Greensburg, Kansas, is rebuilding as a model green community

88

Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy-Efficient Rebuilding After Tragedy: Inspiration from Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg, Kansas Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg, Kansas May 10, 2011 - 3:29pm Addthis Allison Casey Senior Communicator, NREL We discuss the weather a lot here on the Energy Savers Blog. It comes with the territory; seasonal temperature changes influence how we use energy in our homes. We also know that extreme weather can have big consequences; from health to finances to simple comfort, the weather has a huge effect on our daily lives. But one thing we don't discuss here very often is when weather turns tragic. Some areas of the country have seen a lot of terrible weather in recent weeks, with devastating tornadoes and now flooding hitting many states hard. Many people have lost friends and loved ones, and even more

89

Rebuilding It Better: Greensburg, Kansas. Kiowa County Courthouse (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REBUILDING IT BETTER: GREENSBURG, KANSAS REBUILDING IT BETTER: GREENSBURG, KANSAS On May 4, 2007, a massive tornado destroyed or severely damaged 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable rural community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are working with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. Ultimately, these technologies could be replicated in other communities recovering from disaster. Kiowa County Courthouse Originally built in 1914, Kiowa County Courthouse is one of the few buildings that survived the force of the Greensburg tornado: 205-mile-per-hour winds that left a

90

U.S. Energy Secretary Steven Chu to Help Rebuild Homes in New...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steven Chu to Help Rebuild Homes in New Orleans on Veterans Day U.S. Energy Secretary Steven Chu to Help Rebuild Homes in New Orleans on Veterans Day November 9, 2010 - 12:00am...

91

Rebuilding It Better: Greensburg, Kansas, City Hall | Open Energy  

Open Energy Info (EERE)

Hall Hall Jump to: navigation, search Name Rebuilding It Better: Greensburg, Kansas, City Hall Agency/Company /Organization National Renewable Energy Laboratory Focus Area Agriculture, Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Ground Source Heat Pumps, - Solar Pv, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals, Develop Finance and Implement Projects, Create Early Successes Resource Type Case studies/examples Availability Publicly available--Free Publication Date 9/1/2010 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: Greensburg, Kansas, City Hall [1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References

92

Fish Stocks in Rebuilding Plans: A Trend Analysis Introduction  

E-Print Network (OSTI)

into four categories based on the level of fishing mortality (F) and how biomass (B) is responding: 1) The most recent year's estimate of F is above the overfishing level (subject to overfishing; 3) The biomass has increased since the rebuilding plan was implemented; and 4) The biomass has decreased

93

Overview of the Rebuild America Program in Texas  

E-Print Network (OSTI)

The Rebuild America program is a multi-year program, through the U.S. Department of Energy (USDOE), that will increase investment in energy efficiency. As the program progresses, it will save energy, create jobs, and improve the environment. The Brazos Valley Energy Conservation Coalition (BVECC), administered by the Energy Systems Laboratory (ESL) of Texas A&M University, in College Station, Texas received notification of the US. Department of Energy (USDOE)-Rebuild America award in June, 1996. In the first year of this partnership, the BVECC has developed three Rebuild America related projects in Texas totaling more than $3 million in construction costs. The energy conservation retrofits in the three projects include a lighting upgrade, HVAC systems modifications, and an EMCS upgrade/installation. These projects have been financed through internal facility funding or through third party financing institutes. The average payback period of the retrofit projects is eight years. This paper presents an overview of the BVECC Rebuild America program in Texas. It also describes the energy conservation projects in three facilities in Texas where energy conservation retrofits are being implemented.

Saman, N.; Haberl, J. S.; Turner, W. D.

1998-01-01T23:59:59.000Z

94

PEP-II Large Power Supplies Rebuild Program at SLAC  

SciTech Connect

Seven large power supplies (LGPS) with output ratings from 72kW to 270kW power PEP-II quad magnets in the electron-positron collider region. These supplies have posed serious maintenance and reliability problems since they were installed in 1997, resulting in loss of accelerator availability. A redesign/rebuild program was undertaken by the SLAC Power Conversion Department. During the 2004 summer shutdown all the control circuits in these supplies were redesigned and replaced. A new PWM control board, programmable logic controller, and touch panel have been installed to improve LGPS reliability, and to make troubleshooting easier. In this paper we present the details of this rebuilding program and results.

Bellomo, P.; Lipari, J.J.; de Lira, A.C.; Rafael, F.S.; /SLAC

2005-05-17T23:59:59.000Z

95

Microsoft Word - CX-Chehalis-Raymond_rebuild_2010_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Eric Orth Project Manager - TEP-TPP-3 Proposed Action: Rebuild a 19 mile section of the Chehalis-Raymond No. 1, 115-kV transmission line from Chehalis Substation to Pe Ell Substation Budget Information: Work Order #248941 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not effect the environment beyond the previously developed facility area including but not limited to....tower modifications, changing insulators, and replacement of poles ...conductors...and crossarms. Location: The project is located in Lewis County, Washington along Bonneville Power

96

From Tragedy to Triumph - Rebuilding with Renewable Energy after Disaster, EERE (Fact Sheet)  

SciTech Connect

Fact sheet offering practical information about rebuilding using wind, geothermal, and biomass. Includes a list of resources. Highlights successful projects in Greensburg, Kansas.

Not Available

2009-10-01T23:59:59.000Z

97

From Tragedy to Triumph- Rebuilding with Renewable Energy after Disaster, EERE (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE))

Fact sheet offering practical information about rebuilding using wind, geothermal, and biomass. Includes a list of resources. Highlights successful projects in Greensburg, Kansas.

98

From Tragedy to Triumph - Resources for Rebuilding Green after Disaster, EERE (Fact Sheet)  

DOE Green Energy (OSTI)

Fact sheet offering resources for builders and architects to rebuild homes, businesses, and public buildings with energy efficiency and renewable energy such as wind, solar, and geothermal.

Not Available

2009-10-01T23:59:59.000Z

99

Rebuilding It Better: Greensburg, Kansas; High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised)  

SciTech Connect

This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007.

Not Available

2012-04-01T23:59:59.000Z

100

Isolation and characterization of two disintegrins inhibiting ADP-induced human platelet aggregation from the venom of Crotalus scutulatus scutulatus (Mohave Rattlesnake)  

Science Conference Proceedings (OSTI)

Disintegrins and disintegrin-like proteins are molecules found in the venom of four snake families (Atractaspididae, Elapidae, Viperidae, and Colubridae). The disintegrins are nonenzymatic proteins that inhibit cell-cell interactions, cell-matrix interactions, and signal transduction, and may have potential in the treatment of strokes, heart attacks, cancers, and osteoporosis. Prior to 1983, the venom of Crotalus scutulatus scutulatus (Mohave Rattlesnake) was known to be only neurotoxic; however, now there is evidence that these snakes can contain venom with: (1) neurotoxins; (2) hemorrhagins; and (3) both neurotoxins and hemorrhagins. In this study, two disintegrins, mojastin 1 and mojastin 2, from the venom of a Mohave rattlesnake collected in central Arizona (Pinal County), were isolated and characterized. The disintegrins in these venoms were identified by mass-analyzed laser desorption ionization/time-of-flight/time-of-flight (MALDI/TOF/TOF) mass spectrometry as having masses of 7.436 and 7.636 kDa. Their amino acid sequences are similar to crotratroxin, a disintegrin isolated from the venom of the western diamondback rattlesnake (C. atrox). The amino acid sequence of mojastin 1 was identical to the amino acid sequence of a disintegrin isolated from the venom of the Timber rattlesnake (C. horridus). The disintegrins from the Mohave rattlesnake venom were able to inhibit ADP-induced platelet aggregation in whole human blood both having IC{sub 5}s of 13.8 nM, but were not effective in inhibiting the binding of human urinary bladder carcinoma cells (T24) to fibronectin.

Sanchez, Elda E. [Natural Toxins Research Center, College of Arts and Science, 920 University Blvd. MSC 158, Texas A and M University-Kingsville, MSC 158, Kingsville, TX 78363 (United States); Galan, Jacob A. [Natural Toxins Research Center, College of Arts and Science, 920 University Blvd. MSC 158, Texas A and M University-Kingsville, MSC 158, Kingsville, TX 78363 (United States); Russell, William K. [Laboratory for Biological Mass Spectrometry, Department of Chemistry, PO Box 30012, Texas A and M University, College Station, TX 77842-3013 (United States); Soto, Julio G. [Department of Biological Sciences, One Washington Square Duncan Hall, San Jose State University, San Jose, CA 95192-0100 (United States); Russell, David H. [Laboratory for Biological Mass Spectrometry, Department of Chemistry, PO Box 30012, Texas A and M University, College Station, TX 77842-3013 (United States); Perez, John C. [Natural Toxins Research Center, College of Arts and Science, 920 University Blvd. MSC 158, Texas A and M University-Kingsville, MSC 158, Kingsville, TX 78363 (United States)]. E-mail: kfjcp00@tamuk.edu

2006-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Tale of Two Cities: Greensburg Rebuilds as a National Model for A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) This fact sheet provides a summary of how DOE and NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. 54901.pdf More Documents & Publications NREL Helps Greensburg Set the Model for Green Communities (Fact Sheet), Innovation: The Spectrum of Clean Energy Innovation, NREL (National Renewable Energy Laboratory) Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009

102

Rebuilding It Better: City of Greensburg, Kansas, Business Incubator (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95% 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable rural community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are working with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. Ultimately, these technologies could be replicated in other communities recovering from disaster. City of Greensburg SunChips® Business Incubator One year after the tornado, construction began on the new City of Greensburg SunChips ® Business Incubator. The goal was to create a building that would provide affordable office space for small, start-up businesses in the town. The $2.9 million

103

Microsoft Word - CX-Colville-Republic_Rebuild_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Eric Orth Eric Orth Project Manager - TEP-TPP-3 Proposed Action: Colville-Republic No. 1 115-kV rebuild project Budget Information: Work Order #00270698 PP&A Project No.: PP&A 1786 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain... infrastructures...in a condition suitable for a facility to be used for its designated purpose. B4.6, Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including...changing insulators, and replacement of poles, ...conductors, ...and crossarms.

104

Rebuilding It Better: City of Greensburg, Kansas, Business Incubator (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95% 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable rural community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) are working with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. Ultimately, these technologies could be replicated in other communities recovering from disaster. City of Greensburg SunChips® Business Incubator One year after the tornado, construction began on the new City of Greensburg SunChips ® Business Incubator. The goal was to create a building that would provide affordable office space for small, start-up businesses in the town. The $2.9 million

105

Rebuilding It Better: Greensburg, Kansas. City Hall (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City Hall City Hall Destroyed in the tornado, City Hall has been rebuilt green incorporating solar panels, ground source heat pumps, reclaimed materials, and a vegetated roof. The building serves as a symbol of Greensburg's vitality and leadership in becoming a sustainable community where social, environmental, and economic concerns are held in balance. The new Greensburg City Hall is projected to achieve more than 38% energy savings compared to a similar building built to standard code due in part to the 4.8-kilowatt (kW) rooftop photovoltaic (PV) system and ground source heat pumps. REBUILDING IT BETTER: GREENSBURG, KANSAS LEED® Platinum Completed in October 2009, Greensburg City Hall achieved the U.S. Green Building Council's Leadership in Energy and Environmental Design

106

DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Three Projects to Help the Gulf Coast Recover and Three Projects to Help the Gulf Coast Recover and Rebuild DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild January 20, 2006 - 10:52am Addthis ROBINSONVILLE, MS - Energy Secretary Samuel W. Bodman today announced three Department of Energy (DOE) initiatives to help the people in the Gulf coast region recover from the hurricanes in 2005, as well as prevent loss of life and damage in the future. During his speech to the Energy Leadership Forum, the secretary announced that DOE will donate 400,000 hours of supercomputing time at its National Energy Research Scientific Computing Center (NERSC) to the U.S. Army Corps of Engineers to assist with the rebuilding of levees. DOE is also offering hurricane-affected residents free rebuilding workshops providing expert advice on the latest

107

A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Tale of Two Cities: Greensburg Rebuilds as a National Model for A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) This fact sheet provides a summary of how DOE and NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. 54901.pdf More Documents & Publications NREL Helps Greensburg Set the Model for Green Communities (Fact Sheet), Innovation: The Spectrum of Clean Energy Innovation, NREL (National Renewable Energy Laboratory) Leading the Nation in Clean Energy Deployment (Fact Sheet), Integrated Deployment: Overview of Projects (ID)

108

DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Announces Three Projects to Help the Gulf Coast Recover and Announces Three Projects to Help the Gulf Coast Recover and Rebuild DOE Announces Three Projects to Help the Gulf Coast Recover and Rebuild January 20, 2006 - 10:52am Addthis ROBINSONVILLE, MS - Energy Secretary Samuel W. Bodman today announced three Department of Energy (DOE) initiatives to help the people in the Gulf coast region recover from the hurricanes in 2005, as well as prevent loss of life and damage in the future. During his speech to the Energy Leadership Forum, the secretary announced that DOE will donate 400,000 hours of supercomputing time at its National Energy Research Scientific Computing Center (NERSC) to the U.S. Army Corps of Engineers to assist with the rebuilding of levees. DOE is also offering hurricane-affected residents free rebuilding workshops providing expert advice on the latest

109

Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet) (Revised)  

Science Conference Proceedings (OSTI)

This fact sheet provides a summary of how DOE and NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007.

Not Available

2012-08-01T23:59:59.000Z

110

Rebuilding It Better: Greensburg, Kansas; High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised)  

SciTech Connect

This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007.

2012-04-01T23:59:59.000Z

111

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendix H: Educational and Outreach Materials  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Appendix H: Educational and Outreach Materials Page H.1 Rebuilding After Disaster-Going Green from the Ground Up ............... 608 H.2 Greensburg, Kansas-A Better, Greener Place to Live ......................... 633 H.3 From Tragedy to Triumph-Rebuilding Green Homes after Disaster ..... 642 H.4 From Tragedy to Triumph-Rebuilding Green Buildings after Disaster . 647 H.5 From Tragedy to Triumph-Rebuilding with Renewable Energy after Disaster .................................................................................................. 652 H.6 From Tragedy to Triumph-Resources for Rebuilding Green after Disaster .................................................................................................. 657 H.7 Rebuilding It Better-BTI-Greensburg John Deere Dealership .............. 662

112

EA-1665: Final Environmental Assessment and Finding of No Significant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment and Finding of No Final Environmental Assessment and Finding of No Significant Impact EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV Transmission Line Rebuild Project, Mohave County, Arizona For more information, contact: Ms. Linette King Desert Southwest Region Western Area Power Administration P.O. Box 6457 Phoenix, AZ 85005-6457 Telephone: 602-605-2434 Fax: 602-605-2630 Electronic mail: lking@wapa.gov The Western Area Power Administration (Western) plans to rebuild a 26.2-mile-long portion of the existing Davis-Kingman Tap 69-kilovolt (kV) Transmission Line located in Mohave County,Arizona. The existing Davis-Kingman Tap 69-kV Transmission Line originates in Bullhead City, Arizona, at the Davis Dam Switchyard and extends northwest of Kingman, Arizona, four

113

Rebuilding It Better: BTI-Greensburg John Deere Dealership | Open Energy  

Open Energy Info (EERE)

BTI-Greensburg John Deere Dealership BTI-Greensburg John Deere Dealership Jump to: navigation, search Name Rebuilding It Better: BTI-Greensburg John Deere Dealership Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, Water Conservation, Renewable Energy, Wind Phase Bring the Right People Together, Create a Vision, Evaluate Options, Develop Goals Resource Type Case studies/examples Availability Publicly available--Free Publication Date 5/1/2009 Website http://apps1.eere.energy.gov/b Locality Greensburg, Kansas References Rebuilding It Better: BTI-Greensburg John Deere Dealership [1] Contents 1 Overview 2 Highlights 3 Environmental Aspects 4 References Overview The city of Greensburg, Kansas, is rebuilding as a model green community

114

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, as a Model Green Community: A Case Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007. 45135-2_front_matter.pdf 45135-2_appendix-a.pdf 45135-2_appendix-b.pdf 45135-2_appendix-c.pdf 45135-2_appendix-d.pdf 45135-2_appendix-e.pdf 45135-2_appendix-f.pdf 45135-2_appendix-g.pdf 45135-2_appendix-h.pdf More Documents & Publications Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;

115

Rebuilding a Greener New Orleans on Veteran's Day | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuilding a Greener New Orleans on Veteran's Day Rebuilding a Greener New Orleans on Veteran's Day Rebuilding a Greener New Orleans on Veteran's Day Addthis 1 of 9 A home in New Orleans being restored by the St. Bernard Project. Image: Energy Department Image | Photo by Quentin Kruger, Contractor 2 of 9 Secretary Steven Chu arrives at a home in New Orleans to join veterans in reconstruction work. Image: Energy Department Image | Photo by Quentin Kruger, Contractor 3 of 9 Louisiana Congressman Joseph Cao and Zachary Rosenburg, CEO for The Saint Bernard Project, greet Secretary Chu at a home in the early stages of the reconstruction process. Image: Energy Department Image | Photo by Quentin Kruger, Contractor 4 of 9 Secretary Chu mudding walls in the back bedroom. Image: Energy Department Image | Photo by Quentin Kruger, Contractor

116

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, as a Model Green Community: A Case Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009; Appendices This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007. 45135-2_front_matter.pdf 45135-2_appendix-a.pdf 45135-2_appendix-b.pdf 45135-2_appendix-c.pdf 45135-2_appendix-d.pdf 45135-2_appendix-e.pdf 45135-2_appendix-f.pdf 45135-2_appendix-g.pdf 45135-2_appendix-h.pdf More Documents & Publications Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;

117

U.S. Energy Secretary Steven Chu to Help Rebuild Homes in New Orleans on  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steven Chu to Help Rebuild Homes in New Steven Chu to Help Rebuild Homes in New Orleans on Veterans Day U.S. Energy Secretary Steven Chu to Help Rebuild Homes in New Orleans on Veterans Day November 9, 2010 - 12:00am Addthis Washington D.C. --- Underscoring the Obama Administration's commitment to community service, U.S. Energy Secretary Steven Chu will travel to New Orleans on Veterans Day, a national day of service, to volunteer at a home construction site with the St. Bernard Project, a group dedicated to creating ongoing housing opportunities for community residents in the wake of Hurricane Katrina. Working with the Wounded Warrior program, a non-profit group that helps find meaningful work for service men and women, St. Bernard Project trains and employs injured active duty soldiers and veterans in transition after their service. Details about the event are

118

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study;  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greensburg, Kansas, as a Model Green Community: A Case Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007. 45135-1.pdf More Documents & Publications A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE) NREL Helps Greensburg Set the Model for Green Communities (Fact Sheet), Innovation: The Spectrum of Clean Energy Innovation, NREL (National

119

From Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100%  

Open Energy Info (EERE)

Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100% Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100% Renewable Energy City Jump to: navigation, search Name From Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100% Renewable Energy City Agency/Company /Organization National Renewable Energy Laboratory Focus Area Agriculture, Buildings, Commercial, Residential, Economic Development, Energy Efficiency, Industry, People and Policy, Transportation, Water Conservation, Renewable Energy, Biomass, Ground Source Heat Pumps, Water Power, Solar, - Solar Hot Water, - Solar Pv, Wind Phase Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes Resource Type Case studies/examples

120

Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure)  

SciTech Connect

20-page "how-to" guide describing ways to turn a disaster into an opportunity to rebuild with greener energy technologies. It covers such topics as the importance of energy, options for communities, instructions for developing an energy plan, and other considerations. This guide is intended for the community leaders who have experienced a disaster.

Not Available

2009-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Davis-Kingman Draft EA Master_050611  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Davis-Kingman Tap 69-kV Transmission Line Rebuild Mohave County, Arizona DOE/EA-1665 DOI-BLM-AZ-C0-# Prepared for: U.S. Department of Energy Western Area Power Administration 615 South 43rd Avenue Phoenix, Arizona 85009 Cooperating Agencies: Bureau of Land Management Kingman Field Office 2755 Mission Boulevard Kingman, Arizona 86401 Bureau of Reclamation Lower Colorado Regional Office

122

Rebuilding plan implementation in New Orleans, LA : a case study of Freret Street Commercial Corridor and Bayou Road Cultural Corridor  

E-Print Network (OSTI)

Three major rebuilding plans emerged from the planning process that followed the devastation of Hurricane Katrina in New Orleans. Outlining the visions and goals of individual communities across New Orleans, the intent of ...

Alao, Oreoluwa

2008-01-01T23:59:59.000Z

123

Rebuilding It Better; BTI-Greensburg, John Deere Dealership (Brochure) (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BTI-Greensburg BTI-Greensburg John Deere Dealership Rebuilding It Better On May 4 th , 2007, brothers Kelly and Mike Estes saw their BTI-Greensburg John Deere Dealership ruined by an EF-5 tornado. They were not alone in their loss-95% of the town was destroyed that day. So they were overwhelmed the next morning when more than 100 customers and friends arrived to help them salvage what they could. To support the community that helped them so much, Kelly, Mike, and their family committed to rebuilding their business in a better, greener way. They wanted the new 28,000 ft 2 prefabricated metal building to house the world's greenest farm machinery business, attain a LEED ® Platinum rating, and use the least energy possible. And they did all they could to reach these goals.

124

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rebuilding Greensburg, Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study NREL's Technical Assistance to Greensburg June 2007 - May 2009 National Renewable Energy Laboratory Innovation for Our Energy Future Sponsorship Format Reversed Horizontal Format-B Reversed Vertical Format Reversed-A Vertical Format Reversed-B National Renewable Energy Laboratory Innovation for Our Energy Future National Renewable Energy Laboratory Innovation for Our Energy Future Horizontal Format-A Reversed National Renewable Energy Laboratory Innovation for Our Energy Future NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

125

From Tragedy to Triumph: Rebuilding Greensburg, Kansas To Be a 100% Renewable Energy City; Preprint  

SciTech Connect

On May 4, 2007, Greensburg, Kansas, was hit by a 1.7-mile wide tornado with 200 mph-plus wind speeds. This tornado destroyed or severely damaged 90% of Greensburg?s structures. We discuss the progress made in rebuilding Greensburg, with a focus on the built environment and on meeting Greensburg?s goal of 100% renewable energy, 100% of the time. We also discuss key disaster recovery efforts that enabled Greensburg to reach this goal. Key strategies included a Sustainable Comprehensive Master Plan, an ordinance resolving that city-owned buildings achieve LEED Platinum and 42% energy savings, a strong focus on rebuilding 'right' with an integrated design process, attracting significant and sustained technical experts and national media attention, and linking renewable and energy efficiency technologies to business development. After three years, more than half the homes that have been rebuilt are rated at an average of 40% energy savings. All significant commercial buildings, including the school, hospital, banks, courthouse, and retail buildings, have been rebuilt to LEED Gold and Platinum standards and exceed 40% savings, with many exceeding 50% savings. Greensburg recently constructed a 12.5-MW community wind farm to provide all the remaining energy needed for its energy-efficient buildings and homes.

Pless, S.; Billman, L.; Wallach, D.

2010-08-01T23:59:59.000Z

126

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

127

Rebuilding it Better: Greensburg, Kansas, Kiowa County Memorial Hospital (Brochure) (Revised)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Kiowa County Memorial Hospital Kiowa County Memorial Hospital The original Kiowa County Hospital was destroyed in the tornado and rebuilt green. In fact, the hospital's design team took one of the most energy-intensive building types and designed a first-of-its kind energy-efficient hospital, while still meeting functional and safety requirements. The 50,000 square-foot building includes 15 acute-care beds, rural health and specialty clinics, an emergency department with two trauma rooms, physical/occu- pational therapy and radiology departments, a laboratory, and other support areas. The new hospital in Greensburg is projected to achieve more than 40% energy savings when compared to a hospital built to standard code thanks to features such as an on-site wind turbine. REBUILDING IT BETTER: GREENSBURG, KANSAS

128

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study |  

Open Energy Info (EERE)

Kansas, as a Model Green Community: A Case Study Kansas, as a Model Green Community: A Case Study Jump to: navigation, search Name Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study Agency/Company /Organization National Renewable Energy Laboratory Sector Energy Focus Area Agriculture, Buildings, Commercial, Residential, Other, Energy Efficiency - Central Plant, Energy Efficiency - Utility, Economic Development, Energy Efficiency, Other, Non-renewable Energy, People and Policy, Transportation, Water Conservation, Renewable Energy, Biomass, Geothermal, Ground Source Heat Pumps, Hydrogen and Fuel Cells, Solar, - Solar Hot Water, - Solar Pv, Wind Phase Bring the Right People Together, Determine Baseline, Evaluate Options, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes

129

From Tragedy to Triumph - Rebuilding Green Homes after Disaster (Revised) (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tragedy Tragedy to Triumph- Rebuilding Green Homes after Disaster About Green Homes A green home can save you thousands in utility bills and make your home a healthier and more comfortable place to live. Green homes save money with energy-saving features such as effective insulation, high-performance windows, tight construction, and efficient heating and cooling equipment and appliances. Green homes are healthier because they perform better and use green products, protecting homeowners against cold, heat, drafts, moisture, indoor pollutants, and noise. Green homes also protect homeowners against future utility rate increases for gas and electricity. Green homes encourage the use of renewable energy, which can reduce your home's impact on the environment

130

From Tragedy to Triumph - Rebuilding with Renewable Energy after Disaster, EERE (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Science & Technology Facility at the National Renewable Energy Laboratory in Golden, Science & Technology Facility at the National Renewable Energy Laboratory in Golden, Colorado, incorporates a number of advanced energy efficiency and green building concepts. For example, the architecture makes good use of natural light wherever possible, and an automated system dims unnecessary artificial lighting to reduce electricity use. Pat Corkery / PIX15442 From Tragedy to Triumph-Rebuilding with Renewable Energy after Disaster Renewable energy is generated from sources that are "green" and naturally replenished such as sunlight, wind, and geothermal heat. This energy can power, heat, and cool buildings, and can replace traditional sources of fuel (e.g., coal and natural gas) used by utilities. Most utilities are using wind power, but

131

From Tragedy to Triumph - Resources for Rebuilding Green after Disaster, EERE (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Renewable Energy Laboratory's Science & Technology facility is designed to Renewable Energy Laboratory's Science & Technology facility is designed to encompass advanced energy efficiency and "green building" concepts in systems such as lighting and HVAC. Bill Timmerman, NREL/PIX 14963 From Tragedy to Triumph-Resources for Rebuilding Green after Disaster These resources offer builders and architects information about building healthier, more comfortable, and more energy-efficient homes, businesses, and public buildings. Financial Incentives Numerous financial incentives, such as federal and state tax credits and util- ity rebates, are available to help offset the cost of a renewable energy system. Many utility companies also offer net metering for renewable energy systems that are connected to the grid. And the

132

Rebuilding After Disaster: Going Green from the Ground Up | Open Energy  

Open Energy Info (EERE)

After Disaster: Going Green from the Ground Up After Disaster: Going Green from the Ground Up Jump to: navigation, search Name Rebuilding After Disaster: Going Green from the Ground Up Agency/Company /Organization National Renewable Energy Laboratory Focus Area Buildings, Economic Development, Energy Efficiency, People and Policy, Transportation, Water Conservation, Renewable Energy, Biomass, Geothermal, Ground Source Heat Pumps, Solar, - Solar Hot Water, - Solar Pv, Biomass - Waste To Energy, Wind Phase Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes Resource Type Case studies/examples Availability Publicly available--Free Publication Date 10/1/2009

133

From Tragedy to Triumph - Rebuilding Green Buildings after Disaster, EERE (Fact Sheet)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BTI-Greensburg John Deere Dealership is up and running now and being put to the BTI-Greensburg John Deere Dealership is up and running now and being put to the test. To ensure the systems operate as planned, the Estes brothers are undergoing a commissioning process where everything is examined: lighting systems, mechanical systems, materials used, plumbing, and more. This continuous evaluation is critical to keep an efficient, sustainable building running smoothly. Courtesy of BTI-Greensburg/PIX 16647 From Tragedy to Triumph-Rebuilding Green Buildings after Disaster About Green Buildings Green buildings save thousands in utility bills while making the indoor environment healthier and more com- fortable for occupants. According to the U.S. Green Building Council, green commercial and public buildings on average use up to 50% less energy, emit

134

Monitoring and Verification Procedures Used in the Texas LoanSTAR and Rebuild America Programs  

E-Print Network (OSTI)

The monitoring and verification procedures that have been developed for the Texas LoanSTAR program and the ESL's Rebuild America Program have become a foundation for a number of other state and federal M&V programs, including the United States Department of Energy's (USDOE's) 1996 NEMVP, 1997 IPMVP, 2001 IPMVP, ASHRAE's GP 14P, and the 1999 Texas Performance Contracting Guidelines. This paper reviews the basic procedures that are used for monitoring and verifying energy savings in commercial buildings that receive energy conservation retrofits, including procedures that are used for measuring energy savings in buildings where hourly pre-retrofit and post-retrofit whole-building data have been collected; buildings where monthly pre-retrofit and hourly post-retrofit data are collected; and buildings where monthly preretrofit and monthly post-retrofit data are used to verify savings.

Farouz, S.; Baltazar-Cervantes, J. C.; Haberl, J. S.; Claridge, D. E.

2001-01-01T23:59:59.000Z

135

From Tragedy to Triumph: Rebuilding Greensburg, Kansas To Be a 100% Renewable Energy City: Preprint  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conference Paper Conference Paper NREL/CP-550-48300 August 2010 From Tragedy to Triumph: Rebuilding Greensburg, Kansas, To Be a 100% Renewable Energy City Preprint Shanti Pless and Lynn Billman National Renewable Energy Laboratory Daniel Wallach Greensburg GreenTown Presented at ACEEE Summer Study Pacific Grove, California August 15-20, 2010 NOTICE The submitted manuscript has been offered by an employee of the Alliance for Sustainable Energy, LLC (Alliance), a contractor of the US Government under Contract No. DE-AC36-08GO28308. Accordingly, the US Government and Alliance retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government.

136

Rebuilding for Sustainability: Spatial Analysis of Bolivar Peninsula after Hurricane Ike  

E-Print Network (OSTI)

Recurring extreme events of nature challenge disaster-prone settlements in complex ways. Devastating property damages are one of the tests of survival for such settlements in both economic and social terms. It also provides unique opportunities to rethink the environment cleared by massive natural disasters. However, rebuilding for long-term resiliency is one of the least investigated areas, particularly when employing tacit knowledge in the sustainable recovery process. This study examines the post-disaster rebuilding process in spatial terms for Bolivar Peninsula in the aftermath of Hurricane Ike. It further investigates the nexus between connectivity among open space networks to various levels of surge damage among Bolivar spontaneous settlements. The study uses syntactical methods to measure axial connectivity of the Bolivar Peninsula access grid and one-way Analysis of Variance to interpret the way connectivity varies along the no damage to destroyed damage scale. In addition, the permeability rubric analyzes the elevation characteristics of houses that demonstrated higher probabilities of survival through a logistic regression. The conclusions are based on two basic premises. Local knowledge demands an indefinite time to be adapted and mobilized because of the increasing intensity of natural disasters. In addition, the high frequency of disaster events significantly challenges the versatility of local coping and survival strategies. The results reveal that the connectivity of the access grid has an inversely proportional relationship with various damage levels, particularly for no damage and destroyed. Furthermore, out of a number of resiliency characteristics listed in the literature, only ground elevation and ground enclosure demonstrated probability significances for survival. Potentially, the results of this research could support three significant outcomes pertaining to sustainable disaster recovery: preserving place character, social justice among affected groups, and promoting rapid recovery.

Subasinghe Arachchilage Don, Chamila Tharanga

2011-12-01T23:59:59.000Z

137

Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 (Report and Appendices)  

Science Conference Proceedings (OSTI)

This comprehensive case study describes technical assistance provided by NREL to help Greensburg, Kansas, rebuild as a green community after an EF-5 tornado nearly leveled the town in 2007.

Billman, L.

2009-11-01T23:59:59.000Z

138

Snake River Sockeye Salmon Sawtooth Valley Project Conservation and Rebuilding Program : Supplemental Fnal Environmental Assessment.  

DOE Green Energy (OSTI)

This document announces Bonneville Power Administration`s (BPA) proposal to fund three separate but interrelated actions which are integral components of the overall Sawtooth Valley Project to conserve and rebuild the Snake River Sockeye salmon run in the Sawtooth Valley of south-central Idaho. The three actions are as follows: (1) removing a rough fish barrier dam on Pettit Lake Creek and constructing a weir and trapping facilities to monitor future sockeye salmon adult and smolt migration into and out of Pettit Lake; (2) artificially fertilizing Readfish Lake to enhance the food supply for Snake River sockeye salmon juveniles released into the lake; and (3) trapping kokanee fry and adults to monitor the fry population and to reduce the population of kokanee in Redfish Lake. BPA has prepared a supplemental EA (included) which builds on an EA compled in 1994 on the Sawtooth Valley Project. Based on the analysis in this Supplemental EA, BPA has determined that the proposed actions are not major Federal actions significantly affecting the quality of the human environment. Therefore an Environmental Impact Statement is not required.

United States. Bonneville Power Administration.

1995-03-01T23:59:59.000Z

139

Parker Planet_EA_Cover_final  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

inal inal E N V I R O N M E N TA L A S S E S S M E N T FOR PARKER - PLANET TAP 69-KV TRANSMISSION LINE REBUILD, UPGRADE AND RIGHT-OF-WAY ACTION Prepared For: US Department of Energy 615 South 43rd Avenue Phoenix, AZ 85009 Western Area Power Administration Wester n No: DOE/EA-1685 DOI-BLM-AZ-C030-2009-0051-EA COOPERATING AGENCIES: US Bureau of Land Management US F ish and Wildlife Ser vice FINAL ENVIRONMENTAL ASSESSMENT DOE/EA-1685 DOI-BLM-AZ-C030-2009-0051-EA Parker-Planet Tap 69-kV Transmission Line Rebuild, Upgrade, and Right-of-Way Action San Bernardino County, California and Mohave and La Paz Counties, Arizona

140

A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE)  

NLE Websites -- All DOE Office Websites (Extended Search)

Tale of Two Cities: Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities Greensburg, Kansas, was like any rural community in America until a massive tornado leveled much of the town on May 4, 2007. Key leaders in Greensburg and Kansas made a crucial decision not just to rebuild, but to remake the town as a model sustainable community. To help achieve that goal, technical experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) arrived in Greensburg in June 2007. For three years, the experts worked with city leaders, business owners, residents, and other state, federal, and local agencies to identify ways to incorporate energy efficiency and renew- able energy technologies into the town's rebuilding efforts.

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

A Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities (Fact Sheet), Energy Efficiency & Renewable Energy (EERE)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tale of Two Cities: Tale of Two Cities: Greensburg Rebuilds as a National Model for Green Communities Greensburg, Kansas, was like any rural community in America until a massive tornado leveled much of the town on May 4, 2007. Key leaders in Greensburg and Kansas made a crucial decision not just to rebuild, but to remake the town as a model sustainable community. To help achieve that goal, technical experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) arrived in Greensburg in June 2007. For three years, the experts worked with city leaders, business owners, residents, and other state, federal, and local agencies to identify ways to incorporate energy efficiency and renew- able energy technologies into the town's rebuilding efforts.

142

EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in...

143

line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

along the existing along the existing Empire-EDS 11S-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Empire-ED5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system.

144

Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE)  

NLE Websites -- All DOE Office Websites (Extended Search)

On May 4, 2007, a massive tornado destroyed or severely damaged 95% On May 4, 2007, a massive tornado destroyed or severely damaged 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) worked with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. The town showcases energy-saving best practices that can be replicated not only in other communi- ties recovering from disaster, but any location focused on sustainability. The Town of Greensburg Founded in 1886, Greensburg had a population of approximately 1,400 people prior to the tornado, and relied on the agricultural, oil, and gas industries to

145

Greensburg, Kansas: Building a Model Green Community, How Would You Rebuild a Town - Green? April 2009 (Brochure)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GO-102009-2829 * April 2009 GO-102009-2829 * April 2009 Cover photo courtesy of Lynn Billman, NREL Printed with a renewable source ink on paper containing at least 50% wastepaper, including 10% postconsumer waste. For Additional Information, Please Contact: Energy Efficiency and Renewable Energy Information Center 1-877-EERE-INF (1-877-337-3463) www.eere.energy.gov Prepared by NREL, a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. How would you rebuild a town - green? Greensburg, Kansas: Building a Model Green Community Energy Efficiency & Renewable Energy Case Study Database

146

Rebuilding It Better: Greensburg, Kansas, High Performance Buildings Meeting Energy Savings Goals (Brochure) (Revised), Energy Efficiency & Renewable Energy (EERE)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

On May 4, 2007, a massive tornado destroyed or severely damaged 95% On May 4, 2007, a massive tornado destroyed or severely damaged 95% of Greensburg, Kansas. Since then, city and community leaders have been committed to rebuilding the town as a model sustainable community. Experts from the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) worked with city leaders, business owners, and residents to identify ways to incorporate energy efficiency and renewable energy technologies into the new buildings. The town showcases energy-saving best practices that can be replicated not only in other communi- ties recovering from disaster, but any location focused on sustainability. The Town of Greensburg Founded in 1886, Greensburg had a population of approximately 1,400 people prior to the tornado, and relied on the agricultural, oil, and gas industries to

147

Mohave Electric Cooperative - Renewable Energy Incentive Program...  

Open Energy Info (EERE)

PV and Wind systems: 0.35W Solar Water Heating: 0.75kWh of estimated first year energy savings Eligible System Size up to 50 kW or 125% onsite load, whichever is less...

148

Help Line  

NLE Websites -- All DOE Office Websites (Extended Search)

Help Line Help Line Ombuds Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns and want advice or referral while preserving confidentiality and anonymity. Callers may remain anonymous and the Help Line does not have caller ID or other methods of identifying callers. The Help Line maintains the same level of confidentiality and neutrality as the other Ombuds services. The Ombuds Help Line is not for reporting emergencies or officially

149

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2001 Annual Report.  

DOE Green Energy (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 2001 annual report covers the fifth year of sampling of this multi-year study. In 2001 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon rivers. The Snake River was sampled between Lower Granite Dam (rkm 174) and the mouth of the Salmon River (rkm 303), and the Salmon River was sampled from its mouth upstream to Hammer Creek (rkm 84). A total of 45,907 hours of setline effort and 186 hours of hook-and-line effort was employed in 2001. A total of 390 white sturgeon were captured and tagged in the Snake River and 12 in the Salmon River. Since 1997, 36.1 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 42 cm to 307 cm and averaged 107 cm. In the Salmon River, white sturgeon ranged in total length from 66 cm to 235 cm and averaged 160 cm. Using the Jolly-Seber model, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,483 fish, with a 95% confidence interval of 1,208-7,477. An additional 10 white sturgeon were fitted with radio-tags during 2001. The locations of 17 radio-tagged white sturgeon were monitored in 2001. The movement of these fish ranged from 38.6 km (24 miles) downstream to 54.7 km (34 miles) upstream; however, 62.6 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P<0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 30 percent since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir had a higher relative weight factor than white sturgeon in the free-flowing Snake River. A von Bertalanffy growth curve was fitted to 309 aged white sturgeon. The results suggest fish are currently growing faster than fish historically inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate mats were used to document white sturgeon spawning. A total of 14 white sturgeon eggs were recovered in the Snake River in 2001.

Everett, Scott R.; Tuell, Michael A. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2003-03-01T23:59:59.000Z

150

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 1999 Annual Report.  

DOE Green Energy (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 1999 annual report covers the third year of sampling of this multi-year study. In 1999 white sturgeon were captured, marked and population data were collected in the Snake and Salmon rivers. A total of 33,943 hours of setline effort and 2,112 hours of hook-and-line effort was employed in 1999. A total of 289 white sturgeon were captured and tagged in the Snake River and 29 in the Salmon River. Since 1997, 11.1 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 27 cm to 261 cm and averaged 110 cm. In the Salmon River, white sturgeon ranged in total length from 98 cm to 244 cm and averaged 183.5 cm. Using the Jolly-Seber model, the abundance of white sturgeon < 60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 1,823 fish, with a 95% confidence interval of 1,052-4,221. A total of 15 white sturgeon were fitted with radio-tags. The movement of these fish ranged from 6.4 km (4 miles) downstream to 13.7 km (8.5 miles) upstream; however, 83.6 percent of the detected movement was less than 0.8 kilometers (0.5 miles). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P < 0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 29 percent since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir were slightly larger than white sturgeon in the free-flowing Snake River. A von Bertalanffy growth curve was fitted to 49 aged white sturgeon. The results suggests the fish are currently growing faster than fish historicly inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate mats were used to document white sturgeon spawning. Five white sturgeon eggs were recovered in the Snake River.

Tuell, Michael A.; Everett, Scott R. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2003-03-01T23:59:59.000Z

151

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2000 Annual Report.  

DOE Green Energy (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This 2000 annual report covers the fourth year of sampling of this multi-year study. In 2000 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon rivers. The Snake River was sampled between Lower Granite Dam (rkm 174) and the mouth of the Salmon River (rkm 303), and the Salmon River was sampled from its mouth upstream to Hammer Creek (rkm 84). A total of 53,277 hours of setline effort and 630 hours of hook-and-line effort was employed in 2000. A total of 538 white sturgeon were captured and tagged in the Snake River and 25 in the Salmon River. Since 1997, 32.8 percent of the tagged white sturgeon have been recaptured. In the Snake River, white sturgeon ranged in total length from 48 cm to 271 cm and averaged 107 cm. In the Salmon River, white sturgeon ranged in total length from 103 cm to 227 cm and averaged 163 cm. Using the Jolly-Seber open population estimator, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,725 fish, with a 95% confidence interval of 1,668-5,783. A total of 10 white sturgeon were fitted with radio-tags. The movement of these fish ranged from 54.7 km (34 miles) downstream to 78.8 km (49 miles) upstream; however, 43.6 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P<0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 31 percent since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir had a higher relative weight factor than white sturgeon in the free-flowing Snake River. A von Bertalanffy growth curve was fitted to 138 aged white sturgeon. The results suggests fish are currently growing faster than fish historically inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate mats were used to document white sturgeon spawning. A total of 34 white sturgeon eggs were recovered: 27 in the Snake River, and seven in the Salmon River.

Everett, Scott R.; Tuell, Michael A. (Nez Perce Tribe, Department of Fishereis Resource Management, Lapwai, ID)

2003-03-01T23:59:59.000Z

152

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

153

EIS-0297: Notice of Intent To Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0297: Notice of Intent To Prepare an Environmental Impact Statement Proposed Griffith Power Plant and Transmission Line Project, Mohave County, AZ Western Area Power...

154

Rebuilding Together Energy Teams  

NLE Websites -- All DOE Office Websites (Extended Search)

is "to preserve and revitalize houses and communities, assuring that low-income homeowners, from the elderly and disabled to families with children, live in warmth, safety,...

155

REBUILDING SARAJEVO USING PARTNERSHIPS  

Science Conference Proceedings (OSTI)

We live in a world of rapid change. Nowhere has this been more evident over the past years than in Sarajevo. Sarajevo, at the heart of Bosnia-Herzegovina, has experienced war and disruption of unprecedented proportions, as witnessed nightly on media ...

Zlatko Lagumdzija; Mark Adkins; Doug Vogel

1997-01-01T23:59:59.000Z

156

Rebuilding After Disaster: Going Green from the Ground Up (Revised) (Brochure), U.S. Department of Energy (DOE), Energy Efficiency & Renewable Energy (EERE)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

About This Guide If you're a leader in a community that has met with disaster and must be rebuilt, this guide is for you. It's intended to show how communities-big or small-can incorporate green principles and technologies like energy efficiency and renewable energy into their rebuilding plans. The information in this guide is based on the real-life experiences of two U.S. Department of Energy (DOE) teams. One team worked with city leaders in New Orleans, Louisiana, after hurricanes Katrina and Rita in 2005, and the other assisted community leaders in Greens- burg, Kansas, after a devastating tornado in 2007. Although the two communities are quite different, the teams learned common lessons and found that

157

Latest Documents and Notices | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20, 2011 20, 2011 EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado October 20, 2011 EA-1881: Finding of No Significant Impact Energy Conservation Program: Energy Conservation Standards for Fluorescent Lamp Ballasts (October 2011) October 20, 2011 EA-1665: Final Environmental Assessment and Finding of No Significant Impact Davis-Kingman Tap 69-kV Transmission Line Rebuild Project, Mohave County, Arizona October 18, 2011 EIS-0350-S1: Amended Record of Decision Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM October 17, 2011 EIS-0283-S2: Interim Action Determination Disposition of Certain Plutonium Materials Stored at the Savannah River

158

EA-1665: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1665: Draft Environmental Assessment Davis-Kingman Tap 69-kV Transmission Line Rebuild, Mohave County, Arizona This Environmental Assessment (EA) evaluates the probable and known impacts to the environment from Western's Proposed Action, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with National Environmental Policy Act (NEPA) regulations published by the Council on Environmental Quality (CEQ) (40 CFR 1500-1508) and implementing procedures of DOE (10 CFR 1021). Western is the lead federal agency responsible for preparing the EA. The Department of Interior's (DOI) Bureau of Land Management (BLM) Kingman Field Office and Reclamation's Lower Colorado Regional Office are cooperating

159

BEAM LINE  

NLE Websites -- All DOE Office Websites (Extended Search)

BEAM LINE BEAM LINE 45 W ILHELM ROENTGEN'S INITIAL DISCOVERY of X-radiation in 1895 led immediately to practical applications in medicine. Over the next few decades X rays proved to be an invaluable tool for the investigation of the micro-world of the atom and the development of the quantum theory of matter. Almost a century later, telescopes designed to detect X-radiation are indispensable for understanding the structure and evolution of the macro-world of stars, galaxies, and the Universe as a whole. The X-Ray Universe by WALLACE H. TUCKER X-ray images of the Universe are strikingly different from the usual visible-light images. 46 SUMMER 1995 did not think: I investigated." Undeterred by NASA's rejection of a proposal to search for cosmic X-radiation, Giacconi persuaded the

160

Notices of Availability (NOA) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 13, 2012 June 13, 2012 EIS-0457: Notice of Availability of a Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 8, 2012 EIS-0414: EPA Notice of Availability of a Final Environmental Impact Statement Energia Sierra Juarez Transmission Project June 8, 2012 EIS-0427: EPA Notice of Availability of a Final Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona May 4, 2012 EIS-0441: Amended Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm Project, Mohave County, Arizona April 27, 2012 EIS-0441: EPA Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm Project, Mohave County, Arizona April 27, 2012 EIS-0457: EPA Notice of Availability of a Final Environmental Impact

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

1993-12-01T23:59:59.000Z

162

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

163

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

164

Microsoft Word - CX-NorthBonneville-RossNorthBonneville-Troutdale_LineSwap_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Civil Engineer - TEP-TPP-3 Proposed Action: North Bonneville-Ross #1 230-kV, North Bonneville-Troutdale #2 230-kV transmission line maintenance Budget Information: Work Order #00246927 PP&A Project No.: PP&A 1666 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.13 Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines approximately 20 miles in length or less to enhance environmental and land use values. Such actions include relocations to avoid right-of-way encroachments, resolve conflict with property development, accommodate road/highway construction, allow for the construction of facilities

165

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program  

Science Conference Proceedings (OSTI)

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

Johnson, Justin; Smith, Cale; Young, Mike; Donohoo, Ken; Owen, Ross; Clark, Eddit; Espejo, Raul; Aivaliotis, Sandy; Stelmak, Ron; Mohr, Ron; Barba, Cristian; Gonzalez, Guillermo; Malkin, Stuart; Dimitrova, Vessela; Ragsdale, Gary; Mitchem, Sean; Jeirath, Nakul; Loomis, Joe; Trevino, Gerardo; Syracuse, Steve; Hurst, Neil; Mereness, Matt; Johnson, Chad; Bivens, Carrie

2013-05-04T23:59:59.000Z

166

EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

167

EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Grandby Pumping Plant Switchyard Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

168

EIS-0400: Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE))

Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

169

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 1997 Annual Report.  

DOE Green Energy (OSTI)

During 1997 the first phase of the Nez Perce Tribe White Sturgeon Project was completed and the second phase was initiated. During Phase I the ''Upper Snake River White Sturgeon Biological Assessment'' was completed, successfully: (1) compiling regional white sturgeon management objectives, and (2) identifying potential mitigation actions needed to rebuild the white sturgeon population in the Snake River between Hells Canyon and Lower Granite dams. Risks and uncertainties associated with implementation of these potential mitigative actions could not be fully assessed because critical information concerning the status of the population and their habitat requirements were unknown. The biological risk assessment identified the fundamental information concerning the white sturgeon population that is needed to fully evaluate the effectiveness of alternative mitigative strategies. Accordingly, a multi-year research plan was developed to collect specific biological and environmental data needed to assess the health and status of the population and characterize habitat used for spawning and rearing. In addition, in 1997 Phase II of the project was initiated. White sturgeon were captured, marked, and population data were collected between Lower Granite Dam and the mouth of the Salmon River. During 1997, 316 white sturgeon were captured in the Snake River. Of these, 298 were marked. Differences in the fork length frequency distributions of the white sturgeon were not affected by collection method. No significant differences in length frequency distributions of sturgeon captured in Lower Granite Reservoir and the mid- and upper free-flowing reaches of the Snake River were detected. The length frequency distribution indicated that white sturgeon between 92 and 183 cm are prevalent in the reaches of the Snake River that were sampled. However, white sturgeon >183 have not changed markedly since 1970. I would speculate that some factor other than past over-fishing practices is limiting the recruitment of white sturgeon into larger size classes (>183 cm). Habitat, food resources, and migration have been severely altered by the impoundment of the Snake River and it appears that the recruitment of young may not be severely affected as recruitment of fish into size classes > 183 cm.

Hoefs, Nancy (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2004-02-01T23:59:59.000Z

170

From: Mohave Sun Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

put a higher priority on projects that use proven and financeable technologies (e.g., parabolic trough, molten salt storage) over projects that use emerging technologies (e.g.,...

171

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

172

Nuclear reactor overflow line  

DOE Patents (OSTI)

The overflow line for the reactor vessel of a liquid-metal-cooled nuclear reactor includes means for establishing and maintaining a continuous bleed flow of coolant amounting to 5 to 10% of the total coolant flow through the overflow line to prevent thermal shock to the overflow line when the reactor is restarted following a trip. Preferably a tube is disposed concentrically just inside the overflow line extending from a point just inside the reactor vessel to an overflow tank and a suction line is provided opening into the body of liquid metal in the reactor vessel and into the annulus between the overflow line and the inner tube.

Severson, Wayne J. (Pittsburgh, PA)

1976-01-01T23:59:59.000Z

173

BlackLining Demo BlackLining Demo  

E-Print Network (OSTI)

BlackLining Demo BlackLining Demo BlackLining Demo YOUR PAYCHECKPAYROLL TAXES AND EMPLOYMENT LAW BY SPONSORED BY #12;BlackLining Demo e BlackLining Demo e BlackLining Demo e AMERICAN PAYROLL ASSOCIATION i Design by PRIWORKS.com. Images from Thinkstock.com. #12;BlackLining Demo BlackLining Demo Black

Harms, Kyle E.

174

Evaluate Potenial Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 2002 Annual Report.  

DOE Green Energy (OSTI)

The specific research goal of this project is to identify means to restore and rebuild the Snake River white sturgeon (Acipenser transmontanus) population to support a sustainable annual subsistence harvest equivalent to 5 kg/ha/yr (CBFWA 1997). Based on data collected, a white sturgeon adaptive management plan will be developed. This report presents a summary of results from the 1997-2002 Phase II data collection and represents the end of phase II. From 1997 to 2001 white sturgeon were captured, marked, and population data were collected in the Snake and Salmon. A total of 1,785 white sturgeon were captured and tagged in the Snake River and 77 in the Salmon River. Since 1997, 25.8 percent of the tagged white sturgeon have been recaptured. Relative density of white sturgeon was highest in the free-flowing segment of the Snake River, with reduced densities of fish in Lower Granite Reservoir, and low densities the Salmon River. Differences were detected in the length frequency distributions of white sturgeon in Lower Granite Reservoir, the free-flowing Snake River and the Salmon River (Chi-Square test, P<0.05). The proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 30 percent since the 1970's. Using the Jolly-Seber model, the abundance of white sturgeon <60 cm, between Lower Granite Dam and the mouth of the Salmon River, was estimated at 2,483 fish, with a 95% confidence interval of 1,208-7,477. Total annual mortality rate was estimated to be 0.14 (95% confidence interval of 0.12 to 0.17). A total of 35 white sturgeon were fitted with radio-tags during 1999-2002. The movement of these fish ranged from 53 km (33 miles) downstream to 77 km (48 miles) upstream; however, 38.8 percent of the detected movement was less than 0.8 km (0.5 mile). Both radio-tagged fish and recaptured white sturgeon in Lower Granite Reservoir appear to move more than fish in the free-flowing segment of the Snake River. No seasonal movement pattern was detected, and no movement pattern was detected for different size fish. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir had a higher relative weight factor than white sturgeon in the free-flowing Snake River. The results suggest fish are currently growing faster than fish historically inhabiting the study area, as well as other Columbia River basin white sturgeon populations. Artificial substrate egg mats documented white sturgeon spawning in four consecutive years. A total of 49 white sturgeon eggs were recovered in the Snake River from 1999-2002, and seven from the Salmon River during 2000.

Everett, Scott R.; Tuell, Michael A.; Hesse, Jay A. (Nez Perce Tribe, Department of Fisheries Management, Lapwai, ID)

2004-02-01T23:59:59.000Z

175

North Australian Cloud Lines  

Science Conference Proceedings (OSTI)

A satellite classification and climatology of propagating mesoscale cloud fines in northern Australia is presented. These cloud fines range from long, narrow lines of shallow convection to extensive deep convective squall lines with mesoscale ...

W. Drosdowsky; G. J. Holland

1987-11-01T23:59:59.000Z

176

Power Line-Induced AC Potential on Natural Gas Pipelines for Complex Rights-of-Way Configurations, Volume 4: Field Verification of H orizontal Wire Mitigation Method  

Science Conference Proceedings (OSTI)

Volume 4 of this four-volume report contains details on a new method of mitigating induced voltage on pipelines by coupling them with a conductor buried in parallel. A field demonstration of this mitigation method that took place in California's Mohave Desert is also described.

1984-04-01T23:59:59.000Z

177

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

178

Notice of Intent to Prepare an Environmental Impact Statement for the Granby Pumping Plant-Windy Gap Transmission Line Rebuild Project, Grand County, CO (DOE/EIS-0400)(08/10/07)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

040 Federal Register 040 Federal Register / Vol. 72, No. 154 / Friday, August 10, 2007 / Notices g. Filed Pursuant to: 18 CFR 4.200. h. Applicant Contact: David Lovely, Hydro Supervisor, Madison Paper Industries, P.O. Box 129, 3 Main Street, Madison, Maine 04950-0129, (207) 696- 1225. i. FERC Contact: Robert Bell, (202) 502-6062. j. Deadline for filing comments, motions to intervene and protest: August 20, 2007. Please include the project number (P- 2365-040) on any comments or motions filed. All documents (original and seven copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper, see 18 CFR

179

Germ-line Allele  

NLE Websites -- All DOE Office Websites (Extended Search)

Germ-line Allele Germ-line Allele Name: Rachel Location: N/A Country: N/A Date: N/A Question: Can you please explain a "germ-line allele" to me! It is very important for a research paper I am writing about breast cancer. Replies: Mutations in genes are only able to be passed to the offspring if they are found in gametes (egg, sperm) mutations that occur in body cells other than gametes are usually not important because the cells can be replaced and they die eventually. The only way a characteristic can be passed to the offspring is through the eggs and sperm, so if there is a mutation in one these cells, the offspring can inherit the mutation. So a germ-line cell is a gamete. And a germ line allele is a version of the trait that is passed to the offspring through the germ line cell (or gamete).

180

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

New Construction of Distribution Lines, Service Lines, and Appurtenant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resources Outside Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant...

182

Power line detection system  

DOE Patents (OSTI)

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

Latorre, V.R.; Watwood, D.B.

1994-09-27T23:59:59.000Z

183

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

184

Power line detection system  

DOE Patents (OSTI)

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

Latorre, Victor R. (Tracy, CA); Watwood, Donald B. (Tracy, CA)

1994-01-01T23:59:59.000Z

185

Transmission Line Grounding  

Science Conference Proceedings (OSTI)

In 2008, the Electric Power Research Institute (EPRI) published a comprehensive grounding report. Published in two parts, the report covered the theoretical and practical aspects of transmission line grounding practices. To further improve the tools available for grounding analysis, an investigation into practical ways to calculate the fault current distribution and ground potential rise of the transmission line grounding system was conducted. Furthermore, a survey of utilities has documented industry pr...

2011-12-23T23:59:59.000Z

186

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

187

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Construction of Distribution Lines, Service Lines, and New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Environmental Regulations Provider New York State Public Service Commission Any proposed construction of distribution lines, service lines, and appurtenant facilities to electric utilities located near scenic areas of

188

2005 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

U.S. Energy Information Administration (EIA)

2010 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE. Kerosene. ... • Geothermal energy drilling company • Logging company •Privately owned port or loading dock

189

SPEAR3 Beam Line Availability  

NLE Websites -- All DOE Office Websites (Extended Search)

Beam Line Support | Floor Support | Administrative Support SPEAR3 Beam Line Availability Beam Line BL Type Technique(s) Status 1-4 X-ray Small and Wide Angle X-ray Scattering Open...

190

Utility Line Inspections and Audits  

Science Conference Proceedings (OSTI)

Utility Line Inspections and Audits provides utility engineers with a concise reference for the pros, cons, and how to related to performing various line inspections and audits.

2007-03-21T23:59:59.000Z

191

Beam-line cryopump  

DOE Green Energy (OSTI)

A cryopumping module using metallic surfaces at liquid helium temperature for condensation of hydrogen and deuterium gas has been constructed. This pump, a prototype of four units which will provide pumping for the Livermore 200 kV test stand, will be used to verify the concept and establish engineering parameters. Upon completion of engineering tests and evaluation the pump will be installed in an operating beam line. The design point pumping capacity is 80,000 liters per second for hydrogen and deuterium at 10$sup -4$ torr based on sticking coefficients of 0.15 and 0.25, respectively. Both the liquid helium temperature pumping surface and the liquid nitrogen temperature radiation shields are constructed of quilted double wall cylindrical shells. The pumping shell dimensions are 1.5 meters dia. x 0.6 meters long. Cryogen circulation is convection current driven in both cases. Liquid helium is supplied from an overhead Dewar through bayonet coupling. In the 200 kV beam line, pumping modules will be supplied via transfer lines from a central Dewar. Voltage standoff will be accomplished in the transfer lines. (auth)

Duffy, T.J.; Oddon, L.D.

1975-11-12T23:59:59.000Z

192

Omega Transmission Lines  

E-Print Network (OSTI)

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

193

On line course organization  

Science Conference Proceedings (OSTI)

In order to help users access on-line materials with more specific questions, we build a learning portal named Fusion. First we develop Fusion-Crawler, a link classification focused crawler, to download potential course pages. We then use a binary classifier ... Keywords: focused crawling, learning object management, metadata extraction, ontology

Ming Zhang; Weichun Wang; Yi Zhou; Yu Yang; Yuhong Xiong; Xiaoming Li

2007-08-01T23:59:59.000Z

194

Stereoscopic 3D line drawing  

Science Conference Proceedings (OSTI)

This paper discusses stereoscopic 3D imaging based on line drawing of 3D shapes. We describe the major issues and challenges in generating stereoscopic 3D effects using lines only, with a couple of relatively simple approaches called each-eye-based and ... Keywords: binocular rivalry, line drawing, line stylization, non-photorealism, stereo coherence, stereoscopy

Yongjin Kim; Yunjin Lee; Henry Kang; Seungyong Lee

2013-07-01T23:59:59.000Z

195

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

196

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

197

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission lines between two adjacent periodic intersections to be longer than the other. 5 figs.

Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; deGrassie, J.S.

1990-03-02T23:59:59.000Z

198

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

199

Nonlinear magnetoinductive transmission lines  

E-Print Network (OSTI)

Power transmission in one-dimensional nonlinear magnetic metamaterials driven at one end is investigated numerically and analytically in a wide frequency range. The nonlinear magnetic metamaterials are composed of varactor-loaded split-ring resonators which are coupled magnetically through their mutual inductances, forming thus a magnetoiductive transmission line. In the linear limit, significant power transmission along the array only appears for frequencies inside the linear magnetoinductive wave band. We present analytical, closed form solutions for the magnetoinductive waves transmitting the power in this regime, and their discrete frequency dispersion. When nonlinearity is important, more frequency bands with significant power transmission along the array may appear. In the equivalent circuit picture, the nonlinear magnetoiductive transmission line driven at one end by a relatively weak electromotive force, can be modeled by coupled resistive-inductive-capacitive (RLC) circuits with voltage-dependent cap...

Lazarides, Nikos; Tsironis, G P

2011-01-01T23:59:59.000Z

200

Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams, 1998 Annual Report.  

DOE Green Energy (OSTI)

In 1998 white sturgeon (Acipenser transmontanus) were captured, marked, and population data were collected in the Snake River between Lower Granite Dam and the mouth of the Salmon River. A total of 13,785 hours of setline effort and 389 hours of hook-and-line effort was employed in 1998. Of the 278 white sturgeon captured in the Snake River, 238 were marked for future identification. Three sturgeon were captured in the Salmon River and none were captured in the Clearwater River. Since 1997, 6.9% of the tagged fish have been recovered. Movement of recaptured white sturgeon ranged from 98.5 kilometers downstream to 60.7 kilometers upstream, however, less than 25% of the fish moved more than 16 kilometers (10 miles). In the Snake River, white sturgeon ranged in total length from 51.5 cm to 286 cm and averaged 118.9 cm. Differences were detected in the length frequency distributions of sturgeon in Lower Granite Reservoir and the free-flowing Snake River (Chi-Square test, P < 0.05). In addition, the proportion of white sturgeon greater than 92 cm (total length) in the free-flowing Snake River has shown an increase of 37% since the 1970's. Analysis of the length-weight relationship indicated that white sturgeon in Lower Granite Reservoir were slightly larger than white sturgeon in the free-flowing Snake River.

Everett, Scott R.; Tuell, Michael A. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2002-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction of Distribution Lines, Service Lines, and Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) < Back Eligibility Commercial Installer/Contractor Institutional Investor-Owned Utility Low-Income Residential Multi-Family Residential Municipal/Public Utility Residential Rural Electric Cooperative Schools Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Home Weatherization Water Buying & Making Electricity Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any proposed construction of electricity-related facilities in residential

202

EA-1931: Draft Environmental Assessment | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power...

203

Commercial Lining Products  

Science Conference Proceedings (OSTI)

Table 1   Comparative ranking of rubber lining materials...Heat Oxidation Ultraviolet Abrasion Weathering Oil Motor fuels Acid Alkali Flame Natural rubber NR 5 4 4 4 4 6 6 3 3 6 Styrene-butadiene SBR 4 3 3 2 4 5 6 3 3 6 Nitrile NBR 3 3 3 2 3 1 6 4 4 6 Chloroprene CR 2 2 2 3 2 2 3 1 2 2 Chlorosulfonylpolyethylene CSM 2 2 2 3 2 2 2 2 2 3 Isobutylene-isoprene...

204

Utility Lines and Facilities (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations apply to the construction of utility and power lines and facilities. They address the use of public right-of-ways for such construction, underground power lines, and construction...

205

Strong Lines of Mercury ( Hg )  

Science Conference Proceedings (OSTI)

... Mercury (Hg) Homepage - Introduction Finding list Select element by name. Select element by atomic number. ... Strong Lines of Mercury ( Hg ). ...

206

Strong Lines of Plutonium ( Pu )  

Science Conference Proceedings (OSTI)

... Plutonium (Pu) Homepage - Introduction Finding list Select element by name. Select element by atomic number. ... Strong Lines of Plutonium ( Pu ). ...

207

Strong Lines of Tungsten ( W )  

Science Conference Proceedings (OSTI)

... Tungsten (W) Homepage - Introduction Finding list Select element by name. Select element by atomic number. ... Strong Lines of Tungsten ( W ). ...

208

IPF Overhead Line Uprating Wizard  

Science Conference Proceedings (OSTI)

The Increased Power Flow (IPF) Wizard ranks various line uprating methods available on the basis of a series of relatively simple questions about the rating increase needed, the condition of the line, regulatory restrictions, and basic design parameters of the existing line. The Wizard’s knowledge base contains 17 different uprating methods selected and defined by the contractors. A series of 22 questions concerning such variables as line rating assumptions, physical condition, and permitting were define...

2009-03-17T23:59:59.000Z

209

Strong Lines of Hydrogen ( H )  

Science Conference Proceedings (OSTI)

... Hydrogen (H) Homepage - Introduction Finding list Select element by name. Select element by atomic number. ... Strong Lines of Hydrogen ( H ). ...

210

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

211

2005 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

U.S. Energy Information Administration (EIA) Indexed Site

Page 1 Page 1 2012 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE Kerosene Line No. Sold directly to consumers for: 1 Residential Use (Non-Farm): * Backup generator * Home heating and cooking * Personal lawn equipment * EXCLUDE: Apartment buildings and Farmhouses 2 Commercial Use: * Apartment building * Bank * Casino * Church * College/School/Institution * Department/Retail store * Environmental clean-up service * Flushing fuel lines * Forestry service * Golf course * Government (Federal, State, local, and district; INCLUDE fuel used in vehicles) * Hazardous waste company * Hospital * Hotel/Motel * Landfill site government owned * Landscaping * Laundry company * Lumber yard that sells the lumber * Medical service * Port Authority/publicly owned port or loading dock

212

HVDC Overhead Line Performance Study  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) is documenting the various factors that should be considered when designing and building new high-voltage direct current (HVDC) lines or when converting AC lines to HVDC. Given the limited number of HVDC lines that have been designed and built around the world, even some basic factors (for example, insulator flashover in severely contaminated regions) are not completely understood. This report concerns a crucial first step in better understanding and improving...

2011-08-02T23:59:59.000Z

213

Transmission Line Design and Construction  

Science Conference Proceedings (OSTI)

The power industry wants to construct reliable and cost-effective overhead lines. A reliable and cost effective line requires not only that the line and structures meet design criteria for strength, clearances, and electrical considerations, but also that it be designed for safe and easy construction and maintenance. Design and construction practices should therefore go hand in hand. Information among various departments within a utility has to be shared for mutual benefit. Communication is a key ...

2012-12-31T23:59:59.000Z

214

The Pulse Line Ion Accelerator Concept  

E-Print Network (OSTI)

be modeled as a transmission line with equivalent inductancez , t ) (see Fig. 1), the transmission line equations in thethese elementary transmission line equations are traveling

Briggs, Richard J.

2006-01-01T23:59:59.000Z

215

LINE-ABOVE-GROUND ATTENUATOR  

DOE Patents (OSTI)

The line-above-ground attenuator provides a continuously variable microwave attenuator for a coaxial line that is capable of high attenuation and low insertion loss. The device consists of a short section of the line-above- ground plane type transmission lime, a pair of identical rectangular slabs of lossy material like polytron, whose longitudinal axes are parallel to and indentically spaced away from either side of the line, and a geared mechanism to adjust amd maintain this spaced relationship. This device permits optimum fineness and accuracy of attenuator control which heretofore has been difficult to achieve.

Wilds, R.B.; Ames, J.R.

1957-09-24T23:59:59.000Z

216

Re-Building Greensburg | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy 101: Wind Turbines Energy 101: Solar PV Sec. Chu Online Town Hall Energy 101: Cool Roofs Energy 101: Geothermal Heat Pumps Why Cool Roofs? Chu at COP-16: Building a...

217

Molding the unshapely structure : rebuilding Boston Chinatown  

E-Print Network (OSTI)

This study is an attempt to interpret and comprehend the development pattern of urban form in an ethnic community, in this case Boston Chinatown. The study does not propose a detailed urban design framework but calls for ...

Lim, Meng Howe

1994-01-01T23:59:59.000Z

218

Re-Building Greensburg | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pledge? Conversation on the Future of the Wind Industry Science Lecture: Talking the Higgs Boson with Dr. Joseph Incandela Bill Gates and Deputy Secretary Poneman Discuss the...

219

Re-Building Greensburg | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Future of Biofuels The Climate Challenge... and What's at Stake Sec. Chu Announces the First Auto Loans for Advanced Technologies...

220

Rebuilding London's Landscape [Landscape as Mentor  

E-Print Network (OSTI)

proposed one-thousand-foot-tall tower. People say that it isdo you decide how tall Foster’s tower should be? London sits

Shepheard, Paul

2000-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Greensburg, Kansas : rebuilding a green town  

E-Print Network (OSTI)

The tornado that hit Greensburg, Kansas, in May 2007, traveled down the center of Main Street at two hundred and five miles per hour and destroyed ninety-five percent of the town's built environment. The extensive damage ...

Bromberg, Anna (Anna Miriam)

2009-01-01T23:59:59.000Z

222

Re-Building Greensburg | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sources -Renewables --Solar --Wind --Geothermal --Bioenergy -Fossil --Oil --Natural Gas -Nuclear Energy Usage -Storage --Hydrogen & Fuel Cells -Transmission -Consumption...

223

Re-Building Greensburg | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Security & Safety -Emergency Response & Procedures or Search Energy.gov Search Clear Filters All Videos ARPA-E 2011 Keynote: Dr. Arun Majumdar ARPA-E 2011 Keynote: Ray Mabus,...

224

Applications of Line Profile Analysis  

Science Conference Proceedings (OSTI)

Feb 16, 2010 ... Neutron and X-Ray Studies of Advanced Materials III : Applications of Line Profile ... Science: Robert Von Dreele1; 1APS/Argonne National Laboratory .... using an X-ray synchrotron beam line of the Advanced Photon Source.

225

Software Tackles Production Line Machine ?Cyclic Jitters?  

Science Conference Proceedings (OSTI)

Software Tackles Production Line Machine 'Cyclic ... products, even shutting down assembly lines. ... high-speed data transmission characteristics of ...

2011-07-18T23:59:59.000Z

226

Microsoft Word - WWTR_FONSI05162011.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Walla Walla-Tucannon River Transmission Line Walla Walla-Tucannon River Transmission Line Rebuild Project Finding of No Significant Impact May 2011 Walla Walla-Tucannon Transmission Line Rebuild Project 1 Finding of No Significant Impact Walla Walla-Tucannon Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact and Floodplain Statement of Findings DOE EA-1731 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115- kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is

227

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

228

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

229

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

230

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

231

Preliminary Draft EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement January 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement Bonneville Power Administration January 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany-

232

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

233

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Download EIS-0441: Final Environmental Impact Statement Mohave County Wind Farm Project, Mohave County, Arizona http:energy.govnepadownloads...

234

Shape optimization using reflection lines  

Science Conference Proceedings (OSTI)

Many common objects have highly reflective metallic or painted finishes. Their appearance is primarily defined by the distortion the curved shape of the surface introduces in the reflections of surrounding objects. Reflection lines are commonly used ...

E. Tosun; Y. I. Gingold; J. Reisman; D. Zorin

2007-07-01T23:59:59.000Z

235

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

236

fault diagnosis of a high voltage transmission line using waveform ...  

E-Print Network (OSTI)

Oct 4, 2013 ... FAULT DIAGNOSIS OF A HIGH VOLTAGE TRANSMISSION LINE USING ... Fault types such as single line to ground, line to line, double line to ...

237

Two terminal line voltage thermostat  

Science Conference Proceedings (OSTI)

A two terminal line voltage thermostat includes a switch which effectively connects line voltage to a heater load. The entire process is controlled by an integrated circuit microcontroller which is powered by a rectified voltage from a transformer secondary connected to a primary which is in series with the heater load. Backup battery power is provided to maintain limited functions of the microcontroller in the event of overall power loss. The microcontroller is programmed to meet the temperature sensing and control requirements specific to a two terminal electric baseboard heating installation. 7 figs.

Stalsberg, K.J.; Ingalls, J.E.; Hoglund, S.R.

1995-10-10T23:59:59.000Z

238

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

239

Zigzag Survey Designs in Line Transect Sampling  

E-Print Network (OSTI)

survey lines are frequently used in shipboard and aerial line transect surveys of animal populations; Systematic designs; Zigzag designs. 1. INTRODUCTION Shipboard and aerial line transect surveys are widelyZigzag Survey Designs in Line Transect Sampling Samantha STRINDBERG and Stephen T. BUCKLAND Zigzag

Buckland, Steve

240

BOREAS Survey On-Line  

NLE Websites -- All DOE Office Websites (Extended Search)

FF33"> FF33"> BOREAS Survey On-Line To improve the BOREAS and BOREAS Follow-On data sets and to meet users' needs, we are conducting a survey. The BOREAS and BOREAS Follow-On data sets continue to be important products at the ORNL DAAC. To date we have provided over 8,000 data products from these projects to nearly 1,500 users. We invite you to fill out this survey, identifying any problems you had with the data and documentation or any difficulties you experienced in finding and acquiring the data sets. Information you provide will enable us to address problems that need attention. It will also help us determine which aspects of the BOREAS and BOREAS Follow-On information need to be expanded. You can complete the survey at the BOREAS Home Page. After you complete the on-line survey, submit your answers to the ORNL

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Beam line windows at LAMPF  

Science Conference Proceedings (OSTI)

The A-6 main beam-line window at LAMPF separates the vacuum of the main beam line from the isotope production station, proton irradiation ports, and the beam stop, which operate in air. This window must withstand the design beam current of 1 mA at 800 MeV for periods of at least 3000 hours without failure. The window is water cooled and must be strong enough to withstand the 2.1 MPa (300 psig) cooling water pressure, as well as beam-induced thermal stresses. Two designs have been used to meet these goals, a stepped-plate window and a hemispherical window, both made from a precipitation-hardened nickel base alloy, Alloy 718. Calculations of the temperatures and stresses in each of these windows are presented.

Brown, R.D.; Grisham, D.L.; Lambert, J.E.

1985-01-01T23:59:59.000Z

242

Guide for Transmission Line Grounding  

Science Conference Proceedings (OSTI)

Electrical utilities have a duty to provide effective grounding for managing steady-state and fault currents, whether near a large generating station or at a remote distribution pole ground. For transmission lines, this imperative is usually met with investment in overhead ground wires and grounding electrodes. Effective grounding at each tower improves reliability8212by providing low path impedance to lightning strokes8212and contributes to safety. However, the fundamental physical parameters in ground ...

2007-12-20T23:59:59.000Z

243

Managing Transmission Line Wood Structures  

Science Conference Proceedings (OSTI)

Transmission and distribution infrastructures throughout the world are aging. As such, inspection, assessment, and maintenance of existing facilities have become increasingly important topics. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance program for transmission line wood structures to help utilities develop and refine individual maintenance programs. The report is part of a broader multi-year effort by EPRI to develop a comprehensive handb...

2006-09-28T23:59:59.000Z

244

In-Line Thermoelectric Module  

DOE Patents (OSTI)

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an-in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions maybe perpendicular to the direction-of current flow through the module.

Pento, Robert; Marks, James E.; Staffanson, Clifford D.

1998-07-28T23:59:59.000Z

245

In-line thermoelectric module  

DOE Patents (OSTI)

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions may be perpendicular to the direction of current flow through the module.

Pento, Robert (Algonquin, IL); Marks, James E. (Glenville, NY); Staffanson, Clifford D. (S. Glens Falls, NY)

2000-01-01T23:59:59.000Z

246

Tropical Squall Lines of the Arizona Monsoon  

Science Conference Proceedings (OSTI)

Squall lines possessing nearly all the characteristics of tropical squall lines occasionally develop during the summer monsoon over southern Arizona and northwestern Mexico. Initial thunderstorm formation is over the Continental Divide in the ...

Walter P. Smith; Robert L. Gall

1989-07-01T23:59:59.000Z

247

Squall-Line Intensification via Hydrometeor Recirculation  

Science Conference Proceedings (OSTI)

Many studies have demonstrated the intimate connection between microphysics and deep moist convection, especially for squall lines via cold pool pathways. The present study examines four numerically simulated idealized squall lines using the ...

Robert B. Seigel; Susan C. van den Heever

2013-07-01T23:59:59.000Z

248

Potential Vorticity Anomalies Associated with Squall Lines  

Science Conference Proceedings (OSTI)

This study involves observations and model simulations of potential vorticity anomalies in the wake of midlatitude squall lines. Using data from the Oklahoma–Kansas PRE-STORM experiment, we analyze potential vorticity fields near two squall lines—...

Rolf F. A. Hertenstein; Wayne H. Schubert

1991-07-01T23:59:59.000Z

249

A Computer Package for Transmission Line Analysis  

Science Conference Proceedings (OSTI)

A computer program, LIGNE, has been developed as a comprehensive teaching aid for the section on transmission line theory in an electromagnetics course. The program assists the student in the analysis of transmission lines, enabling him to quickly assess ...

Georges-Andre Chaudron; Manfred Nachman

1987-11-01T23:59:59.000Z

250

Microsoft Word - Ch1_PN_040611km  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bandon-Rogue Transmission Line Bandon-Rogue Transmission Line Rebuild Project Finding of No Significant Impact May 2011 This page left intentionally blank. Bonneville Power Administration 1 Bandon-Rogue Transmission Line Rebuild Project DEPARTMENT OF ENERGY Bonneville Power Administration Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings DOE EA-1739 Summary: Bonneville Power Administration (BPA) announces its environmental findings on the Bandon-Rogue Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Bandon-Rogue 115-kilovolt (kV) transmission line. The 46-mile-long transmission line is located in Coos and Curry counties in Oregon, extending from the city of Bandon to near Nesika Beach.

251

Methods of Using Existing Wire Lines (power lines, phone lines, internet lines) for Totally Secure Classical Communication Utilizing Kirchoff's Law and Johnson-like Noise  

E-Print Network (OSTI)

We outline some general solutions to use already existing and currently used wire lines, such as power lines, phone lines, internet lines, etc, for the unconditionally secure communication method based on Kirchoff's Law and Johnson-like Noise (KLJN). Two different methods are shown. One is based on filters used at single wires and the other one utilizes a common mode voltage superimposed on a three-phase powerline.

Laszlo B. Kish

2006-10-02T23:59:59.000Z

252

Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization  

DOE Patents (OSTI)

Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes.

Jankowiak, Ryszard J. (Ames, IA); Small, Gerald J. (Ames, IA); Shields, Peter A. (Reading, MA)

1999-04-27T23:59:59.000Z

253

Practical pairwise testing for software product lines  

Science Conference Proceedings (OSTI)

One key challenge for software product lines is efficiently managing variability throughout their lifecycle. In this paper, we address the problem of variability in software product lines testing. We (1) identify a set of issues that must be addressed ... Keywords: feature modelling, software product lines, variability management

Dusica Marijan, Arnaud Gotlieb, Sagar Sen, Aymeric Hervieu

2013-08-01T23:59:59.000Z

254

Visualizing DIII-D Tokamak magnetic field lines  

Science Conference Proceedings (OSTI)

Keywords: graphics hardware, haloed lines, illuminated lines, interactive visualization, magentic field, plasma physics, tokamak

Greg Schussman; Kwan-Liu Ma; David Schissel; Todd Evans

2000-10-01T23:59:59.000Z

255

Neutron Drip-Line Topography  

Science Conference Proceedings (OSTI)

The development of microscopic mass models is a crucial ingredient for the understanding of how most of the elements of our world were fabricated. Confidence in drip-line predictions of such models requires their comparison with new mass data for nuclides far from stability. We combine theory and experiment using results that are state of the art: the latest mass measurements from the Penning-trap spectrometer ISOLTRAP at CERN-ISOLDE are used to confront the predictions of the latest Skyrme-Hartree-Fock-Bogoliubov (HFB) microscopic mass models. In addition, we compare the new data to predictions of other types of mass models and the extrapolative behavior of the various models is analyzed to highlight topographical trends along the shores of the nuclear chart.

Ramirez, E. Minaya; Audi, G.; Lunney, D.; Naimi, S. [Centre de Spectrometrie Nucleaire et de Spectrometrie de Masse, Universite Paris Sud, Orsay (France); Beck, D.; Herfurth, F. [GSI Helmholtzzentrum fuer Schwerionenforschung, Darmstadt (Germany); Blaum, K.; Borgmann, C.; George, S.; Kellerbauer, A. [Max-Planck-Institut fuer Kernphysik, Heidelberg (Germany); Boehm, Ch.; Neidherr, D. [Institut fuer Physik, Johannes-Gutenberg-Universitaet, Mainz (Germany); Breitenfeldt, M.; Rosenbusch, M.; Schweikhard, L. [Institut fuer Physik, Ernst-Moritz-Arndt-Universitaet, Greifswald (Germany); Chamel, N.; Goriely, S. [Institut d'Astronomie et d'Astrophysique, Universite Libre de Bruxelles (Belgium); Herlert, A.; Kowalska, M. [Physics Department, Centre European de Recherche Nucleaire, Geneva (Switzerland); Pearson, J. M. [Department of Physics, Universite de Montreal, Montreal, Quebec (Canada)] (and others)

2009-08-26T23:59:59.000Z

256

Gamma-Ray Burst Lines  

E-Print Network (OSTI)

The evidence for spectral features in gamma-ray bursts is summarized. As a guide for evaluating the evidence, the properties of gamma-ray detectors and the methods of analyzing gamma-ray spectra are reviewed. In the 1980's, observations indicated that absorption features below 100 keV were present in a large fraction of bright gamma-ray bursts. There were also reports of emission features around 400 keV. During the 1990's the situation has become much less clear. A small fraction of bursts observed with BATSE have statistically significant low-energy features, but the reality of the features is suspect because in several cases the data of the BATSE detectors appear to be inconsistent. Furthermore, most of the possible features appear in emission rather than the expected absorption. Analysis of data from other instruments has either not been finalized or has not detected lines.

Michael S. Briggs

1999-10-20T23:59:59.000Z

257

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

258

Power Line Calculator for DOS  

Science Conference Proceedings (OSTI)

The Power Line Calculator (PLC) for DOS, version 1.0, is a program that describes the electrical characteristics of a transmission or distribution system given user-defined input. This input may consist of a combination of operating currents and phases, symmetric components, power factor, and real or reactive power. The program also allows the user to designate whether currents are present on the system neutral or in the ground. The PLC assumes that any value entered by the user remains fixed (e.g., phase current, power factor), and for underdetermined systems, basic default assumptions are incorporated: the power factor is held at or near 1.0, the net phase current is kept at or near zero, and the phase conductor currents are kept balanced. The program operates under PC/MS-DOS version 3.3 or later, and the output is available in both tabular and graphic formats.

Silva, J.M. (Enertech Consultants, Campbell, CA (United States))

1992-11-01T23:59:59.000Z

259

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

260

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

1987-05-19T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

On-line transformer monitoring  

Science Conference Proceedings (OSTI)

There are presently many different approaches to transformer monitoring, either on the market or under development. There are also, many different opinions about how on-line monitoring should be accomplished. On the one hand, efforts are being made to develop expert systems that monitor all transformer parameters and generate an estimate of overall transformer condition. On the other hand, a large number of transformer monitors, designed to monitor one or two specific parameters are already on the market. Another important factor to consider in choosing a monitor is who receives the information and how it is transmitted. The ultimate transformer monitor should feed into the supervisory control and data acquisition (Scada) system. This paper discusses the various aspects of this issue including asset protection, cost control, dissolved gases, pinpointing bad bushings and current transformers, hot spot measurement partial discharge, and water-in-oil measurements. 10 figs.

NONE

1995-10-01T23:59:59.000Z

262

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

263

Separation of magnetic field lines  

SciTech Connect

The field lines of magnetic fields that depend on three spatial coordinates are shown to have a fundamentally different behavior from those that depend on two coordinates. Unlike two-coordinate cases, a flux tube in a magnetic field that depends on all three spatial coordinates that has a circular cross section at one location along the tube characteristically has a highly distorted cross section at other locations. In an ideal evolution of a magnetic field, the current densities typically increase. Crudely stated, if the current densities increase by a factor {sigma}, the ratio of the long to the short distance across a cross section of a flux tube characteristically increases by e{sup 2{sigma}}, and the ratio of the longer distance to the initial radius increases as e{sup {sigma}}. Electron inertia prevents a plasma from isolating two magnetic field structures on a distance scale shorter than c/{omega}{sub pe}, which is about 10 cm in the solar corona, and reconnection must be triggered if {sigma} becomes sufficiently large. The radius of the sun, R{sub Circled-Dot-Operator }=7 Multiplication-Sign 10{sup 10}cm is about e{sup 23} times larger, so when {sigma} Greater-Than-Or-Equivalent-To 23, two lines separated by c/{omega}{sub pe} at one location can be separated by the full scale of any magnetic structures in the corona at another. The conditions for achieving a large exponentiation, {sigma}, are derived, and the importance of exponentiation is discussed.

Boozer, Allen H. [Department of Applied Physics and Applied Mathematics, Columbia University, New York, New York 10027 (United States)

2012-11-15T23:59:59.000Z

264

Marine surveys aid gas line  

Science Conference Proceedings (OSTI)

Detailed marine surveys helped B.C. Hydro, a Canadian gas distribution utility, select the submarine route portion of the proposed Vancouver Island gas pipeline system. In 1984, after a series of government hearings, B.C. Hydro's route selection was adopted by the British Columbia Provincial Government. Vancouver Island is the last major population center in Western Canada not supplied with natural gas. In fact, studies of a gas pipeline to the island have been carried out periodically over the past 30 years. But until recently, all schemes have appeared unattractive because of a combination of technical, economic, and political factors. The proposed Vancouver Island project which is awaiting funding, consists of a dual 52.7-km marine transmission pipeline link from the mainland to the island. Diameter of this portion of line will be either 12 of 16-in. Also, part of the proposed system will be an 18.5-km line on the mainland, a 280-km transmission pipeline on the island, compression facilities, and distribution systems in the major population centers. Diameters for the land portions will vary between 6 and 24 in. For several months in late 1983 and early 1984, the project was the subject of public hearings held by the British Columbia Utilities Commission. This process was complicated when two companies applied to construct and operate the marine pipeline link to the island using completely different routes and techniques. In July 1984, the commission recommended to the Provincial Government that B.C. Hydro's proposal for the marine pipeline be accepted. It further recommended that an Energy Project Certificate for construction of the pipeline link to the island be awarded to B.C. Hydro. The recommendation was accepted by the Provincial Government and the project now awaits a funding agreement between the Federal and Provincial Governments.

Park, C.A.; Baines, F.A. Koenig, H.L.

1986-05-05T23:59:59.000Z

265

Computing criticality of lines in power systems  

E-Print Network (OSTI)

Abstract — We propose a computationally efficient method based on nonlinear optimization to identify critical lines, failure of which can cause severe blackouts. Our method computes criticality measure for all lines at a time, as opposed to detecting a single vulnerability, providing a global view of the system. This information on criticality of lines can be used to identify multiple contingencies by selectively exploring multiple combinations of broken lines. The effectiveness of our method is demonstrated on the IEEE 30 and 118 bus systems, where we can very quickly detect the most critical lines in the system and identify severe multiple contingencies. I.

Ali P?nar; Adam Reichert; Bernard Lesieutre

2007-01-01T23:59:59.000Z

266

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

267

Line Extension Alternatives | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Line Extension Alternatives Line Extension Alternatives Line Extension Alternatives < Back Eligibility Utility Savings Category Energy Sources Buying & Making Electricity Solar Wind Program Info State Vermont Program Type Line Extension Analysis Provider Vermont Department of Public Service The Public Service Board (PSB) of Vermont developed rules regarding utility line extension requests. While the majority of the rules focus on the procedure followed (and associated fees) for the actual line extensions, the PSB also included a provision that requires the electric utilities to provide written information to customers about off-grid electricity generators as an alternative to line extensions. The PSB recognized that in many cases off-grid electricity generators are less expensive than

268

Line Extension Analysis | Open Energy Information  

Open Energy Info (EERE)

Line Extension Analysis Line Extension Analysis Jump to: navigation, search When a prospective electric customer requests service for a home or facility that is not currently serviced by the electric grid, the customer usually must pay a distance-based fee for the cost of extending power lines to the home or facility. In many cases, it is cheaper to use an on-site renewable energy system to meet a prospective customerÂ’s electricity needs. Certain states require utilities to provide information regarding renewable energy options when prospective customers request a line extension. [1] Line Extension Analysis Incentives CSV (rows 1 - 12) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Authorization of Line Extension (Nebraska) Line Extension Analysis Nebraska Agricultural

269

EA-1731: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding of No Significant Impact Finding of No Significant Impact EA-1731: Finding of No Significant Impact Walla Walla-Tucannon River Transmission Line Rebuild Project Bonneville Power Administration (BPA) announces its environmental findings on the Walla Walla-Tucannon River Transmission Line Rebuild Project (Rebuild Project or Proposed Action). The Rebuild Project involves rebuilding the existing Walla Walla-Tucannon River 115-kilovolt (kV) transmission line, which was built in 1940. The 47-mile-long transmission line is located in Walla Walla and Columbia counties in Washington, extending from the city of Walla Walla to near the town of Dayton. Walla Walla-Tucannon River Transmission Line Rebuild Project, DOE/EA-1731, (May 2011) More Documents & Publications EA-1731: Final Environmental Assessment

270

EA-1456: Mitigation Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

456: Mitigation Action Plan EA-1456: Mitigation Action Plan Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project Carbon, Albany and Laramie Counties, Wyoming...

271

EA-1855: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Action Plan (MAP) is part of the Finding of No Significant Impact for the Creston-Bell Transmission Line Rebuild Project (Proposed Action). The Proposed Action involves...

272

EA-1617: Mitigation Action Plan | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Mitigation Action Plan EA-1617: Mitigation Action Plan Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, Big Horn and Carbon Counties,...

273

Planning and Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

274

EIS-0400: Record of Decision | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

EIS-0400: Record of Decision Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Western Area Power Administration...

275

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

276

Single transmission line data acquisition system  

DOE Patents (OSTI)

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

277

Magnetic Materials for Broadband Transmission Line  

E-Print Network (OSTI)

The author’s series of articles on broadband transmission line transformers (TLTs) concludes with these notes on magnetic materials and the properties that are important for best performance Ferrite and iron powder magnetic materials were developed to support a wide range of components, including inductors, EMI suppressors, conventional transformers and transmission line transformers (TLTs). This article deals with transmission line transformers, presenting the observations and conclusions of the author, reached after extensive experimental research into the behavior and performance of these devices in broadband applications. Figure 1 · The three transformers used in comparing the performance of the autotransformer and the transmission line transformer. At the top left is an autotransformer; at the top right is the transmission line transformer, while at the bottom is a transmission line transformer without a ferrite core. All transformers had a total of 10 turns.

Jerry Sevick

2005-01-01T23:59:59.000Z

278

NSLS-II Transport Line Progress  

SciTech Connect

The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

Fliller R. P.; Wahl, W.; Anderson, A.; Benish, B.; DeBoer, W.; Ganetis, G.; Heese, R.; Hseuh, H.-C.; Hu, J.-P.; Johanson, M.P.; Kosciuk, B.N.; Padrazo, D.; Roy, K.; Shaftan, T.; Singh, O.; Tuozzolo, J.; Wang, G.

2012-05-20T23:59:59.000Z

279

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

High-voltage direct current (HVDC) transmission lines are used to transmit large amounts of power over long distances. The Electric Power Research Institute (EPRI) and others have produced many publications over approximately the past three decades, expounding on this topic. Several HVDC transmission lines have been built and have been in operation around the world over that period, and recently, there has been increased interest in the advantages that HVDC transmission affords. HVDC lines, like high-vol...

2010-12-23T23:59:59.000Z

280

Evaluation of Emerging Line Inspection Technologies  

Science Conference Proceedings (OSTI)

This report describes field tests to examine various technologies available to establish conductor temperature during lidar field surveys of existing transmission lines. This is critical to assembling a proper line model to determine accurate sags and clearances. Lidar surveys are intended to demonstrate whether transmission lines have required clearances under full rating and specified environmental conditions. Typically, the technique used to establish conductor temperature at the ...

2012-11-28T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

282

20120131 DOE Congestion Study Clean Line Comments 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Line is an independent developer of four long-haul, high voltage direct current ("HVDC") transmission lines across the United States. Clean Line focuses exclusively on connecting...

283

Point-line spaces related to Jordan pairs.  

E-Print Network (OSTI)

??A point-line space is an abstract geometric object that consists of a set of points and a set of lines such that on each line… (more)

Huggenberger, Simon

2009-01-01T23:59:59.000Z

284

Fermilab | Take Five for Goal Zero | Gloves | Lined Leather Gloves  

NLE Websites -- All DOE Office Websites (Extended Search)

Lined Leather Gloves Lined Leather Gloves Description Color Finish Uses FNAL Stock Number Fleece lined for warmth Keystone Thumb Shirred Elastic Back Color coded cuff indicates...

285

NIST: Atomic Spectros. - Spectral Line Shapes, etc.  

Science Conference Proceedings (OSTI)

... For a Maxwellian velocity distribution, the line shape is Gaussian; the full width at ... Shapes are often approximately Lorentzian, ie, I(?) ? {1 + [(? - ? 0 ...

286

Emergency Management Lines of Inquiry, April 2008  

NLE Websites -- All DOE Office Websites (Extended Search)

3, 2008 EMERGENCY MANAGEMENT Inspection Criteria, Activities, and Lines of Inquiry Functional Area: Hazards Survey (HS) and Emergency Planning Hazards Assessment (EPHA) Inspection...

287

Northern Pass Transmission Line Project Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September...

288

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

289

Nonthermal effects on hydrogen-line profiles  

DOE Green Energy (OSTI)

Experimentally determined level populations of hydrogen excited states from a low-density Z pinch are used as initial conditions in a simulation to derive electron-velocity distributions. These velocity distributions show excess electrons in the high velocity end of the distribution when compared to a Maxwellian velocity distribution. The non-Maxwellian velocity distributions are used to find the nonequilibrium structure factors which are a main component in the plasma line broadening of hydrogen lines. The line profiles generated using the structure factors show plasmon satellites on the wings of the Balmer-..cap alpha..- and -..beta..-line profiles.

Lee, R.W.; Morgan, W.L.

1985-07-01T23:59:59.000Z

290

Line Heat-Source Guarded Hot Plate  

Science Conference Proceedings (OSTI)

Line Heat-Source Guarded Hot Plate. Description: The 1-meter guarded hot-plate apparatus measures thermal conductivity of building insulation. ...

2012-03-06T23:59:59.000Z

291

Emergency Management Lines of Inquiry, April 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23, 2008 EMERGENCY MANAGEMENT Inspection Criteria, Activities, and Lines of Inquiry Functional Area: Hazards Survey (HS) and Emergency Planning Hazards Assessment (EPHA) Inspection...

292

Effects of line shifts and the ion quadrupole contribution of spectral line asymmetries.  

SciTech Connect

Line asymmetries and the corresponding shift of spectral lines due to the electron penetration of the radiator orbitals and the ion quadrupole contribution become more significant with increasing principal quantum number and increasing electron density. The mean field static shift due to electron penetration of the orbitals gives rise to an overall shift of the line to lower energy and a significant asymmetry near line center, but does not generate much redhlue far wing asymmetry. The ion quadrupole contribution results in a small blue shift of the spectral line and a small change in asymmetry near line center, but it gives rise to a significant redhlue wing asymmetry in the far wings of the line. Experimental data fiom recent spherical implosion experiments on OMEGA shows evidence of the mean field static shift and may also show the effects of level interactions between the Ar Lyman -{gamma}, -{delta}, -{var_epsilon} lines and also the Ar He -{gamma}, -{delta} lines.

Gunderson, M. A. (Mark A.); Delamater, N. D. (Norman D.); Kilcrease, D. P. (David P.); Haynes, D. A. (Donald A.)

2002-01-01T23:59:59.000Z

293

Theoretical Atomic Physics code development IV: LINES, A code for computing atomic line spectra  

SciTech Connect

A new computer program, LINES, has been developed for simulating atomic line emission and absorption spectra using the accurate fine structure energy levels and transition strengths calculated by the (CATS) Cowan Atomic Structure code. Population distributions for the ion stages are obtained in LINES by using the Local Thermodynamic Equilibrium (LTE) model. LINES is also useful for displaying the pertinent atomic data generated by CATS. This report describes the use of LINES. Both CATS and LINES are part of the Theoretical Atomic PhysicS (TAPS) code development effort at Los Alamos. 11 refs., 9 figs., 1 tab.

Abdallah, J. Jr.; Clark, R.E.H.

1988-12-01T23:59:59.000Z

294

The Swinburne on-line education project  

Science Conference Proceedings (OSTI)

Many universities throughout the world are exploring the possibilities of on-line delivery of educational programs. These developments have the potential to significantly change the face of higher education as we know it today. In order to compete in ... Keywords: WWW, on-line education

C. J. Pilgrim; M. J. Creek

1998-08-01T23:59:59.000Z

295

Base line estimation using sparse nonlinear operators  

Science Conference Proceedings (OSTI)

Efficient nonlinear operators for base line estimation of high energy physics detector signals are introduced. Due to the high processing rate requirements the operators are simplified using sparse input sequences. The operators are a sparse order statistic ... Keywords: base line estimation, filter training, order statistic filter

Sami J. Inkinen; Yrjö Neuvo

2002-05-01T23:59:59.000Z

296

Transmission line protection based on travelling waves  

Science Conference Proceedings (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

297

Requirements Uncertainty in a Software Product Line  

Science Conference Proceedings (OSTI)

A complex system's requirements almost always remain uncertain late into its software development. In gas turbine engine control systems at Rolls-Royce, for a traditional project (non-product line) typically 50% of requirements will change between Critical ... Keywords: Requirements, Uncertainty, Software Product Lines

Andy J. Nolan; Silvia Abrahao; Paul C. Clements; Andy Pickard

2011-08-01T23:59:59.000Z

298

Product Line Pricing in a Supply Chain  

Science Conference Proceedings (OSTI)

A vertically integrated channel would prefer to coordinate the pricing of its products. In this paper, we investigate drivers of product line pricing decisions in a bilateral monopoly where a manufacturer produces and sells two substitutable or complementary ... Keywords: complement, equilibrium, marketing, product line pricing, substitute, vertical strategic interaction

Lingxiu Dong; Chakravarthi Narasimhan; Kaijie Zhu

2009-10-01T23:59:59.000Z

299

Overhead Line Worker Practices Survey: 2012  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has undertaken a multiyear research project to identify and describe leading industry overhead line worker practices. This effort is intended to identify and document industry overhead distribution line work practices of note, identify shortterm products (such as practices guidelines) that EPRI can ...

2012-08-23T23:59:59.000Z

300

results and benefits... The Bittern Line Carbon  

E-Print Network (OSTI)

results and benefits... The Bittern Line Carbon Neutral Stations Transport Regeneration Ltd. June 2008 c a s e s t u d yCRed carbon reduction Project Summary Our client, Transport Regeneration Ltd., aims to make nine stations on the Bittern Line between Norwich and Sheringham carbon neutral

Everest, Graham R

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Accelerating line extraction based on GPU  

Science Conference Proceedings (OSTI)

A new line extraction accelerating algorithm based upon graphics processing units (GPUs) is presented. Several techniques are proposed to optimize the GPU computation. Among those improvements, the most important one is the use of "seed pixels", which ... Keywords: GPU, line extraction, parallel processing, phase-based grouping

Li Yu; Xiao'an Tang; Bo Tang

2011-12-01T23:59:59.000Z

302

Separation axioms and the fuzzy real lines  

Science Conference Proceedings (OSTI)

We show that for each lattice L which is completely distributive and equipped with an order-reversing involution, the canonical topology of the fuzzy real line @?(L) is uniformizable in the sense of Hutton; furthermore, this uniformity induces a pseudometric ... Keywords: ?-Hausdorff, Fuzzy subspace, Fuzzy topology, Product L-fuzzy real line, Pseudometrizable, Quasi-uniformity, Suitable, Uniformity

S. E. Rodabaugh

1983-01-01T23:59:59.000Z

303

A Fast Line-by-Line Method for Atmospheric Absorption Computations: The Automatized Atmospheric Absorption Atlas  

Science Conference Proceedings (OSTI)

A computationally fast line-by-line method for the determination of atmospheric absorption is described. This method is based on the creation of an Automatized Atmospheric Absorption Atlas (4A) covering all possible plausible atmospheric ...

N. A. Scott; A. Chedin

1981-07-01T23:59:59.000Z

304

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation...

305

Coupled Lines/Multiport Measurement/Orthogonal Calibration  

Science Conference Proceedings (OSTI)

... understanding of lossy multiconductor transmission lines and modal cross powers. These theoretical developments in coupled line theory have led ...

2012-05-25T23:59:59.000Z

306

Kangley - Echo Lake Transmission Line Project, Final Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selleck Kangley North Bend Cedar Falls Existing Transmission Lines Proposed Transmission Line Alternatives Under Consideration BPA Substation Alternative * * * * * * ...

307

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

308

LineScout technology: from inspection to robotic maintenance on live transmission power lines  

Science Conference Proceedings (OSTI)

Power line inspection and maintenance practices are evolving as changing market regulations, significantly increased line loading and system availability requirements put pressure on grid owners to innovate. Robotics is thus making its debut in that ... Keywords: field robotics, mechanical design, power line inspection robot, telerobotics

Nicolas Pouliot; Serge Montambault

2009-05-01T23:59:59.000Z

309

Productivity Improvement of a Manual Assembly Line  

E-Print Network (OSTI)

The current project addresses the productivity improvement of a manual assembly line by making use of operations analysis in the framework of Lean production. A methodology is proposed that helps to improve the productivity of any production process. The methodology consists of selecting a product or product family to be studied followed by current process study. Once the existing process is documented, all the assembly tasks involved must be timed using time study techniques. Operations analysis enables the reduction of non-productive tasks and results in a set of standardized work elements along with the set of standard procedures for performing the operations. Assembly line balancing along with the associated operations analysis assists in constructing or re-configuring an assembly system, which is the key step in improving the overall performance of an assembly line. Following this approach, two manual assembly line configurations (single stage parallel line and five-stage serial line) are constructed for a case study. The results show that by changing over to the single stage assembly line configuration the operator productivity is doubled when compared to the existing assembly method.

Yerasi, Pranavi

2011-08-01T23:59:59.000Z

310

Definition: Tie Line Bias | Open Energy Information  

Open Energy Info (EERE)

Line Bias Line Bias Jump to: navigation, search Dictionary.png Tie Line Bias A mode of Automatic Generation Control that allows the Balancing Authority to maintain its Interchange Schedule and respond to Interconnection frequency error.[1] Related Terms Balancing Authority, Automatic Generation Control, frequency error, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Tie_Line_Bias&oldid=502569" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

311

Definition: Tie Line | Open Energy Information  

Open Energy Info (EERE)

Authority Area, smart grid References Glossary of Terms Used in Reliability Standards An in LikeLike UnlikeLike You like this.Sign Up to see what your friends like. line...

312

Mesoscale Structure of an Oklahoma Squall Line  

Science Conference Proceedings (OSTI)

A squall line, which passed through the National Severe Storms Laboratory measonetwork in Oklahoma on 26 April 1969, is analyzed to determine the mesoscale structure. The analyses are based on data from 23 rawinsonde ascents, 29 automatically ...

Judith Stokes Bradberry

1981-05-01T23:59:59.000Z

313

Corona losses in HVdc bipolar lines  

SciTech Connect

The problem related to the prediction of corona losses in HVdc bipolar lines has been solved, in the past, by means of semi-empirical monomial formulae. However, the proposed formulae that are simpler to use do not always give adequate calculation precision, while the formulae that provide the closest results require implicit functions of different complexity, which are difficult to apply; moreover, it is not possible to understand clearly what influence the variations of the different line parameters have on the losses themselves. The new monomial semi-empirical relationship, proposed to predict the corona losses in HVdc bipolar lines, is very simple to use; it highlights the dependence of power losses due to the corona effect by the different line parameters. The formula has been developed by elaborating a considerable amount of available experimental data.

Corbellini, U.; Pelacchi, P. [Univ. of Pisa (Italy). Dept. of Electric Systems and Automation

1996-07-01T23:59:59.000Z

314

Clean Lines: Strategies for Reducing Your Environmental ...  

Science Conference Proceedings (OSTI)

... Flow restrictors to prevent the flow in a water-supply pipe from exceeding a ... On manual lines, racks can be hung on bars over process baths to allow ...

2013-08-16T23:59:59.000Z

315

Momentum Transport by a Line of Cumulonimbus  

Science Conference Proceedings (OSTI)

The vertical transport of horizontal momentum normal to a line of cumulonimbus observed during GATE on 14 September 1974 is against the vertical momentum gradient, contrary to the predictions of mixing-length theory. Data from repeated aircraft ...

Margaret A. LeMone

1983-07-01T23:59:59.000Z

316

Electrical Characterization of Textile Transmission Lines  

E-Print Network (OSTI)

In this paper, electrical characterization and modeling of conductive textiles are presented. A dedicated measurement setup has been developed to allow reliable connection of the textile samples with the equipment cables. Geometrical fabric structures and fabrication tolerances as well as high frequency properties up to 6 GHz for four types of textiles have been determined. Transmission lines with controlled characteristic impedance have been realized enabling the characterization of typical line attenuation factors. This work shows that textile transmission lines can be used for frequencies up to 1.2 GHz and 120 MHz with the maximal lengths of 10 and 100 cm, respectively. Index Terms---Attenuation constants, characteristic impedance, conductive textiles, transmission lines, wearable computing.

Didier Cottet; Janusz Grzyb; Student Member; Student Member; Tünde Kirstein; Gerhard Tröster; Senior Member

2003-01-01T23:59:59.000Z

317

Insulate Steam Distribution and Condensate Return Lines  

Science Conference Proceedings (OSTI)

This revised ITP tip sheet on insulating steam distribution and condensate return lines provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

318

On the Generation of African Squall Lines  

Science Conference Proceedings (OSTI)

Squall lines (SLs) form an important component of the meteorology of northern Africa, and in particular, contribute substantially to rainfall totals. Their generation requires the existence of a potentially unstable low-level supply of moisture ...

David P. Rowell; James R. Milford

1993-06-01T23:59:59.000Z

319

Claw-free graphs and line graphs.  

E-Print Network (OSTI)

??The research of my dissertation is motivated by the conjecture ofThomassen that every 4-connected line graph is hamiltonian and by the conjecture ofTutte that every… (more)

Shao, Yehong, 1976-

2005-01-01T23:59:59.000Z

320

On-line Condenser Fouling Monitor Development  

Science Conference Proceedings (OSTI)

This newly developed, innovative, on-line fouling monitor can continuously display the cleanliness factor of an operating condenser. The monitor facilitates optimization of cooling water treatment and condenser cleaning schedules.

1998-03-17T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

322

Power line communications for smart grid applications  

Science Conference Proceedings (OSTI)

Power line communication, that is, using the electricity infrastructure for data transmission, is experiencing a renaissance in the context of Smart Grid. Smart Grid objectives include the integration of intermittent renewable energy sources into the ...

Lars Torsten Berger, Andreas Schwager, J. Joaquín Escudero-Garzás

2013-01-01T23:59:59.000Z

323

Design of the ILC RTML Extraction Lines  

SciTech Connect

The ILC [1] Damping Ring to the Main Linac beamline (RTML) contains three extraction lines (EL). Each EL can be used both for an emergency abort dumping of the beam and tune-up continual train-by-train extraction. Two of the extraction lines are located downstream of the first and second stages of the RTML bunch compressor, and must accept both compressed and uncompressed beam with energy spreads of 2.5% and 0.15%, respectively. In this paper we report on an optics design that allowed minimizing the length of the extraction lines while offsetting the beam dumps from the main line by the distance required for acceptable radiation levels in the service tunnel. The proposed extraction lines can accommodate beams with different energy spreads while at the same time providing the beam size acceptable for the aluminum dump window. The RTML incorporates three extraction lines, which can be used for either an emergency beam abort or for a train-by-train extraction. The first EL is located downstream of the Damping Ring extraction arc. The other two extraction lines are located downstream of each stage of the two-stage bunch compressor. The first extraction line (EL1) receives 5GeV beam with an 0.15% energy spread. The extraction line located downstream of the first stage of bunch compressor (ELBC1) receives both compressed and uncompressed beam, and therefore must accept beam with both 5 and 4.88GeV energy, and 0.15% and 2.5% energy spread, respectively. The extraction line located after the second stage of the bunch compressor (ELBC2) receives 15GeV beam with either 0.15 or 1.8% energy spread. Each of the three extraction lines is equipped with the 220kW aluminum ball dump, which corresponds to the power of the continuously dumped beam with 5GeV energy, i.e., the beam trains must be delivered to the ELBC2 dump at reduced repetition rate.

Seletskiy, S.; Tenenbaum, P.; Walz, D.; /SLAC; Solyak, N.; /Fermilab

2011-10-17T23:59:59.000Z

324

Honeybees and Power Line EMF Environments  

Science Conference Proceedings (OSTI)

This Resource Paper reviews research relevant to potential interactions between electric and magnetic field environments in the vicinity of high voltage overhead transmission lines. The paper deals first, with a description of a series of electric field studies conducted in a power line environment followed by mechanism studies under controlled conditions; second, with studies of the ability of bees to discriminate static and alternating magnetic fields; and third, with a study of native bees in a power ...

2010-12-06T23:59:59.000Z

325

500-kV Transmission Line Design  

Science Conference Proceedings (OSTI)

The design of an extrahigh-voltage (EHV) transmission line involves an integrated analysis and comparison of influencing factors to develop a structure configuration and conductor/shieldwire system that will provide safe, reliable, and economic service. Many of the parameters in design have varied impacts on the performance characteristics of a transmission line: safety, reliability, capital cost, and lifetime cost. The interdependencies are many and technical in nature. Having a solid knowledge of the p...

2011-02-04T23:59:59.000Z

326

Electrical Effects of HVDC Transmission Lines--2012  

Science Conference Proceedings (OSTI)

Electrical effects may constrain the design of prospective high-voltage direct current (HVDC) lines, when either alone or sharing the same structures with high-voltage alternating current (HVAC) lines. In 2012, the Electric Power Research Institute (EPRI) research focused on electric field and ion density at ground level. The ultimate goal is to calculate with confidence these electrical effects. The work built on research previously performed, including pioneering research performed at EPRI’s ...

2012-12-12T23:59:59.000Z

327

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

Electrical effects can constrain the design of prospective high-voltage direct current (HVDC) lines operating either alone or sharing the same rights of way structures with high-voltage alternate current (HVAC) lines. In 2013, the Electric Power Research Institute (EPRI) research on HVDC electrical effects focused on electric field and ion density at ground level. The ultimate goal of the project is to calculate with confidence these electrical effects. The algorithms on which the software currently ...

2013-11-08T23:59:59.000Z

328

Perspective: Power Lines and Motor Vehicle Electronics  

Science Conference Proceedings (OSTI)

Recent news reports have suggested that the operation of automotive electronic systems (including sudden acceleration) could be affected by the electric and magnetic fields associated with power transmission lines. Based on electromagnetic fundamentals and knowledge of the levels of electric fields, magnetic fields and RF fields from transmission lines, one can evaluate the possibility of an interaction between these exposures and the electronic systems within automobiles, both electric and conventional.

2010-06-06T23:59:59.000Z

329

EA-1595: Finding of No Significant Impact | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

95: Finding of No Significant Impact 95: Finding of No Significant Impact EA-1595: Finding of No Significant Impact Davis-Mead 230-kV Transmission Line Reconductor Project, Mohave County, Arizona and Clark County, Nevada Western Area Power Administration proposes to reconductor the existing 61-mile long 230-kilovolt Davis-Mead Transmission Line located in Clark County, Nevada and Mohave COunty, Arizona. Western owns and operates the existing transmission line. THe transmission line is a mjor component of the electric transmisison grad of the western United States. Department of Energy, Western Area Power Administration Finding of No Significant Impact and Floodplain Statements of Findinds Davis-Mead 230-kV Transmission Line Reconductor Project More Documents & Publications EA-1595: Final Environmental Assessment

330

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement March 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement Bonneville Power Administration March 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: The Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany- Eugene 115-kilovolt No. 1 Transmission Line. This line extends from the Albany Substation in the City of

331

Dissolution of FB-Line Cabinet Sweepings  

DOE Green Energy (OSTI)

Three FB-Line samples were received by the Savannah River National Laboratory (SRNL) for characterization and evaluation for suitability for HB-Line dissolution. These samples are part of a larger sampling/evaluation program in support of FB-Line deinventory efforts. The samples studied were identified as MC04-147- HBL, MC04-148-HBL, and FBL-SWP-04-016-HBL (N). The first sample, MC04-147-HBL, is a portion of FB-Line Packaging and Stabilization (P&S) materials. The second sample, MC04-148-HBL, is a sweeping from Cabinet 6-8, which is not representative of the mechanical line. The third sample, FBL-SWP-04-016-HBL (N), is an FB-Line North cabinet sweeping. The samples were described by FB-Line personnel as containing plutonium oxide (PuO{sub 2}) which had not been high-fired. This description was generally confirmed by solids analysis and off gas measurements. All three samples were dissolved in 8 M HNO{sub 3}/0.1 M KF at 90-100 C leaving minor amounts of solid residue. During dissolution, sample MC04-147 did not generate hydrogen gas. Sample MC04-148 generated modest amounts of gas, which contained 4.0 to 4.7 volume percent (vol %) hydrogen (H{sub 2}) at a ratio of up to 8.4 x 10{sup -5} mol H{sub 2}/g sample. Sample FBL-SWP-04-016-HBL (N) was nearly completely soluble in 8 M HNO{sub 3}and produced a very small amount of gas. Apparently, the CaF{sub 2} in that sample dissolves and provides sufficient fluoride to support the dissolution of other components.

Crowder, Mark L.

2005-06-14T23:59:59.000Z

332

Relationship between System Slope and Updraft Intensity in Squall Lines  

Science Conference Proceedings (OSTI)

In recent years there has been debate about whether squall lines have an “optimal state.” It has been repeatedly demonstrated that the slope of a squall line’s convective region is related to the comparative magnitudes of the squall line’s cold ...

Matthew D. Parker

2010-09-01T23:59:59.000Z

333

Modeling and analysis of electrical power lines for broadband power line communications.  

E-Print Network (OSTI)

??This research seeks to expand the knowledge in the characteristics of power lines and to develop a channel model that can be used for designing… (more)

Meng, Han.

2008-01-01T23:59:59.000Z

334

Double Bottom Line Project Report:Assessing Social Impact In Double Bottom Line Ventures  

E-Print Network (OSTI)

of Key Characteristics Glossary Method Summaries Theories ofin double bottom line ventures methods catalog glossary ofterms glossary of terms This glossary defines the variables

Rosenzweig, William

2004-01-01T23:59:59.000Z

335

EPRI Transmission Line Reference Book (Blue Book): 115-345 kV Compact Line Design  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the Blue Book, which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines. Note that this electronic report is being pu...

2007-12-13T23:59:59.000Z

336

A high accuracy computed water line list  

E-Print Network (OSTI)

A computed list of H$_{2}$$^{16}$O infra-red transition frequencies and intensities is presented. The list, BT2, was produced using a discrete variable representation two-step approach for solving the rotation-vibration nuclear motions. It is the most complete water line list in existence, comprising over 500 million transitions (65% more than any other list) and it is also the most accurate (over 90% of all known experimental energy levels are within 0.3 cm$^{-1}$ of the BT2 values). Its accuracy has been confirmed by extensive testing against astronomical and laboratory data. The line list has been used to identify individual water lines in a variety of objects including: comets, sunspots, a brown dwarf and the nova-like object V838 Mon. Comparison of the observed intensities with those generated by BT2 enables physical values to be derived for these objects. The line list can also be used to provide an opacity for models of the atmospheres of M-dwarf stars and assign previously unknown water lines in laboratory spectra.

R. J. Barber; J. Tennyson; G. J. Harris; R. N. Tolchenov

2006-01-11T23:59:59.000Z

337

MCP Upgrade: Transmission Line and Pore Importance  

E-Print Network (OSTI)

In order to take advantage of all of the benefits of Multi-Channel Plate Photo-Multiplier Tubes (MCPs) a fast and efficient readout scheme must be implemented. One scheme that appears very promising is that of a transmission line coupled to a digital sampling readout. Transmission line readout allows for 2D position reconstruction, as well as an extremely fast response time, allowing for an exceptional timing resolution. I will be discussing the development of a method to connect the transmission line readout to the anode of the MCP, as well as testing the resultant MCP-transmission line readout system. This testing occurred at Argonnes laser lab, which featured a tunable fast rise time laser as well as a data acquisition system with a low noise level. A study to determine the importance of the pore size of the MCP was also carried out at Argonnes laser lab. In this study two MCPs which differed only in pore size (25µm and 10µm) were tested and their timing resolutions were compared. The objective of the following discussion is to quantify the effectiveness of the transmission line readout, learn more about the nature of the MCP and its signals, and look for ways in which to improve upon the present readout technique. 2 Tyler Natoli 1

Tyler Natoli; Advisor Henry Frisch

2009-01-01T23:59:59.000Z

338

Arizona | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm Project, Mohave County, Arizona April 27, 2012 EIS-0441: EPA Notice of...

339

Visual Aspects of the Flanking Line in Severe Thunderstorms  

Science Conference Proceedings (OSTI)

Photographs are presented that illustrate the various forms in which “flanking lines” exist in nature. Flanking lines may appear not only as the commonly observed sloping line of cumulus congestus, but also as erect towers with a vertical face, ...

Howard B. Bluestein

1986-04-01T23:59:59.000Z

340

Electric Transmission Lines (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

EC Transmission Line Risk Identification and Analysis  

SciTech Connect

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

342

Inductive gas line for pulsed lasers  

DOE Patents (OSTI)

A gas laser having a metal inlet gas feed line assembly shaped as a coil, to function as an electrical inductance and therefore high impedance to pulses of electric current applied to electrodes at opposite ends of a discharge tube of a laser, for example. This eliminates a discharge path for the laser through the inlet gas feed line. A ferrite core extends through the coil to increase the inductance of the coil and provide better electric isolation. By elimination of any discharge breakdown through the gas supply, efficiency is increased and a significantly longer operating lifetime of the laser is provided.

Benett, W.J.; Alger, T.W.

1982-09-29T23:59:59.000Z

343

Developments in line-voltage thermostats  

Science Conference Proceedings (OSTI)

A thermostat that provides reliable, accurate temperature control is the key to a comfortable, efficient space-heating system. The lack of a commercially available line-voltage thermostat that is affordable and performs well has been a significant factor in limiting the comfort and popularity of zoned residential electric heating systems. With EPRI support, two manufacturers have developed innovative, electronics-based line-voltage thermostats that offer a cost-effective control option for creating a comfortable environment with zoned electric heat. These thermostats also may help reduce energy consumption.

Kesselring, J.

1992-09-01T23:59:59.000Z

344

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

345

Boron-10 Lined Proportional Counter Wall Effects  

SciTech Connect

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project 'Coincidence Counting With Boron-Based Alternative Neutron Detection Technology' at Pacific Northwest National Laboratory (PNNL) for development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube based system in the configuration of a coincidence counter. This report provides information about how variations in proportional counter radius and gas pressure in a typical coincident counter design might affect the observed signal from boron-lined tubes. A discussion comparing tubes to parallel plate counters is also included.

Siciliano, Edward R.; Kouzes, Richard T.

2012-05-01T23:59:59.000Z

346

Supply/Demand Forecasts Begin to Show Stock Rebuilding  

Gasoline and Diesel Fuel Update (EIA)

9 9 Notes: During 1999, we saw stock draws during the summer months, when we normally see stock builds, and very large stock draws during the winter of 1999/2000. Normally, crude oil production exceeds product demand in the spring and summer, and stocks build. These stocks are subsequently drawn down during the fourth and first quarters (dark blue areas). When the market is in balance, the stock builds equal the draws. During 2000, stocks have gradually built, but following the large stock draws of 1999, inventories needed to have been built more to get back to normal levels. As we look ahead using EIA's base case assumptions for OPEC production, non-OPEC production, and demand, we expect a more seasonal pattern for the next 3 quarters. But since we are beginning the year with

347

Rebuilding the Brookhaven high flux beam reactor: A feasibility study  

SciTech Connect

After nearly thirty years of operation, Brookhaven`s High Flux Beam Reactor (HFBR) is still one of the world`s premier steady-state neutron sources. A major center for condensed matter studies, it currently supports fifteen separate beamlines conducting research in fields as diverse as crystallography, solid-state, nuclear and surface physics, polymer physics and structural biology and will very likely be able to do so for perhaps another decade. But beyond that point the HFBR will be running on borrowed time. Unless appropriate remedial action is taken, progressive radiation-induced embrittlement problems will eventually shut it down. Recognizing the HFBR`s value as a national scientific resource, members of the Laboratory`s scientific and reactor operations staffs began earlier this year to consider what could be done both to extend its useful life and to assure that it continues to provide state-of-the-art research facilities for the scientific community. This report summarizes the findings of that study. It addresses two basic issues: (i) identification and replacement of lifetime-limiting components and (ii) modifications and additions that could expand and enhance the reactor`s research capabilities.

Brynda, W.J.; Passell, L.; Rorer, D.C.

1995-01-01T23:59:59.000Z

348

Rebuilding Greensburg, Kansas, as a Model Green Community: A...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 2 3 4 5 Appendix F: Green Building Codes and Standards Page F. Building Codes for Greensburg - Introductory Discussion... 512 F. Greensburg Green Building...

349

Out of the Ashes: Options for Rebuilding Airline Labor Relations  

E-Print Network (OSTI)

The crisis in the airline industry and its labor relations system creates a window of opportunity to introduce changes that are essential to successful industry recovery. ...

KOCHAN, THOMAS A.

2003-05-02T23:59:59.000Z

350

Rebuilding it Better: Greensburg, Kansas, Kiowa County Memorial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Brochure) (Revised) This brochure details the sustainable and green aspects of the LEED Platinum-designed Kiowa County Memorial Hospital in Greensburg, Kansas. 47461.pdf More...

351

Rebuilding It Better: City of Greensburg, Kansas, Business Incubator...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This brochure details the energy efficient and sustainable aspects of the LEED Platinum-designed SunChips Business Incubator in Greensburg, Kansas. 47189.pdf More Documents &...

352

Rebuilding It Better: Greensburg, Kansas. City Hall (Brochure...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This brochure details the energy efficient and sustainable aspects of the LEED Platinum-designated City Hall building in Greensburg, Kansas....

353

Rebuilding It Better: Greensburg, Kansas, City Hall (Brochure)  

SciTech Connect

This brochure details the energy efficient and sustainable aspects of the LEED Platinum-designated City Hall building in Greensburg, Kansas.

Not Available

2010-09-01T23:59:59.000Z

354

Rebuilding it Better: Greensburg, Kansas, Kiowa County Memorial Hospital (Brochure)  

Science Conference Proceedings (OSTI)

This brochure details the sustainable and green aspects of the LEED Platinum-designed Kiowa County Memorial Hospital in Greensburg, Kansas.

Not Available

2010-03-01T23:59:59.000Z

355

Rebuilding for Sustainability: Case Studies in the Making (Presentation)  

SciTech Connect

NREL has made significant contributions to communities suffering from natural disasters since 2007 in terms of technical assistance regarding energy efficiency and renewable energy options. NREL's work has covered all aspects of energy, including energy opportunities in community planning, policy design, new program design, and specific project design and implementation for energy related to electricity generation, building energy use, and transportation. This presentation highlights work done in New Orleans following Hurricane Katrina; Greensburg, Kansas, following a devastating tornado; and New York and New Jersey following Hurricane Sandy.

Billman, L.

2013-06-01T23:59:59.000Z

356

Energy-Efficient Rebuilding After Tragedy: Inspiration from Greensburg...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Sources Energy Usage Energy Efficiency Climate Change Mission News & Blog Maps Data About Us For Staff & Contractors Offices All Offices Program Offices Staff Offices...

357

Answering the bell : rebuilding New Orleans around neighborhood schools  

E-Print Network (OSTI)

Schools are one of the most important and visible infrastructure elements in residential neighborhoods, given their large physical presence and the social network that they represent. A review of real estate, sociology, ...

Knudsen, Seth (Seth Cunningham)

2008-01-01T23:59:59.000Z

358

Rebuilding It Better; BTI-Greensburg, John Deere Dealership (Brochure)  

SciTech Connect

This case study highlights the energy-saving features of the BTI-Greensburg John Deere Dealership. This metal building is expected to save close to 50% in annual energy cost.

Not Available

2009-04-01T23:59:59.000Z

359

After Sandy, Rebuilding Smarter with Science and Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

called for in the President's Climate Action Plan. Challenging Innovators to Design New Disaster-Response Solutions In August, the White House Office of Science and Technology...

360

Cooling-tower rebuild, treatment overhaul halt fouling  

SciTech Connect

Partial fixes over a period of time were insufficient to meet cooling requirements at this four-tower powerplant. The eventual remedy involved complete fill replacement and chemistry-program revision. Cooling-tower performance hinges on many factors. Assuming the proper water and air distribution and unhindered operation of spray nozzles, pumps, valves, etc, fill design is the key element. However, a decade of experience at Keystone station (operated by Pennsylvania Electric Co for a consortium of East Coast utilities) showed that more than just changing to a fouling-resistant fill was required to provide and maintain design performance. As described in this article, careful analysis, revision, and continuous monitoring of the chemical water-treatment program were needed as well. At each of Keystone's two units, two natural-draft, hyperbolic towers provide cooling for main-condenser circulating water and service water. The 325-ft-tall towers are counter-current flow, and measure 247 ft across the basin. Film-type fill originally installed in the towers consisted of assemblies of fiber-cement board, 9 ft deep in the center and 7 ft in the peripheral regions. Fiber-cement was also the construction material used in the drift eliminators, and in the piping connected to concrete distribution flumes within the towers.

Gall, G.P.

1993-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Uncommon ground : property, coordination, and rebuilding New Orleans  

E-Print Network (OSTI)

Following Hurricane Katrina, difficult decisions must be made by both government and investors with respect to reconstitution of New Orleans' housing stock and neighborhoods. For investors, risk and uncertainty abound. For ...

Stewart, Paul (Paul Burleson)

2006-01-01T23:59:59.000Z

362

Rebuilding a Greener New Orleans on Veteran's Day | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prize rolls into Washington, DC 091610 Jobs by the 1000s Faces of the Recovery Act A Book of Condolences for Fukushima Energy Matters Online Townhall 1 of 5 Clean Energy and...

363

Rebuilding your flooded home: Guidelines for incorporating energy efficiency  

SciTech Connect

Repairs to your flood-damaged home can add energy efficiency at the same time you address pressing structural needs, mainly by replacing and upgrading insulation in walls and floors, and checking your foundation for flood damage. Many energy efficiency options are available to you today that may not have been widely available when you built your house even if that was only a few years ago. Cost-effectiveness depends on several factors, including cost of fuel and materials, efficiency levels of the structure and components, and climate. This booklet offers some general tips to improve the efficiency of your home`s shell and equipment. Additional information on any issue covered in this booklet is available from various agencies within or near your community, including your state energy office, local community action agency, utilities, Red Cross and Federal Emergency Management Agency (FEMA) offices.

1994-05-01T23:59:59.000Z

364

Rebuilding It Better: Greensburg, Kansas. Kiowa County Courthouse (Brochure)  

Energy.gov (U.S. Department of Energy (DOE))

This document is one in a series of five that showcases the green, sustainable buildings in Greensburg, Kansas. The Kiowa County Courthouse was one of only two buildings left standing after the tornado, which allowed the building to be renovated and refurbished rather than torn down.

365

Sandy Vista Regroups and Rebuilds [Participation with a View  

E-Print Network (OSTI)

Left: Proposed build-out of Sandy Vista neighborhood. Above:rehabili­ tated homes in Sandy Vista. 1. New single-familyfund. PLA C ES 1 2 : 2 P1GFORD, WIGHT: SANDY VISTA

Pigford, Richard; Wight, Karen

1999-01-01T23:59:59.000Z

366

Line graph explorer: scalable display of line graphs using Focus+Context  

Science Conference Proceedings (OSTI)

Scientific measurements are often depicted as line graphs. State-of-the-art high throughput systems in life sciences, telemetry and electronics measurement rapidly generate hundreds to thousands of such graphs. Despite the increasing volume and ubiquity ... Keywords: Focus+Context, line graph

Robert Kincaid; Heidi Lam

2006-05-01T23:59:59.000Z

367

Microsoft Word - AlbanyEugene_ROD-MAP_060112.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 1 Bonneville Power Administration's Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Record of Decision June 2012 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap

368

EIS-0325: Schultz-Hanford Area Transmission Line Project Final...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003) EIS-0325: Schultz-Hanford Area Transmission Line Project...

369

EA-1960: Townsite Solar Project Transmission Line, Clark County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management,...

370

Non-Transgenic Cell Lines for Identifying Target Premalignant ...  

Biofuels; Biotechnology & Medicine. ... Non-Transgenic Cell Lines for Identifying Target Premalignant Genes IB-2023 : Berkeley Lab's S3 cell lines display partial

371

Secretary Chu Visits Russian Seaport, Checks Out Second Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Russian Seaport, Checks Out Second Line of Defense Nuclear Detection System Secretary Chu Visits Russian Seaport, Checks Out Second Line of Defense Nuclear Detection System June 7,...

372

Amended Notice of Intent for the Northern Pass Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

373

EA-1896: Williston to Stateline Transmission Line Project, Mountrail...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project,...

374

Request for Information on Permitting of Transmission Lines:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines: Federal...

375

On-line load relief control  

SciTech Connect

This paper describes the results of an investigation concerning the on-line prediction and enhancement of load relief. The effects of voltage fluctuation, system voltage profile control and generator voltage adjustment on load relief and load shedding operations during under-frequency transients are studied. The technique promoted in the paper may be used to reduce system spinning reserve or prospective load shedding.

Jovanovic, S.; Fox, B.; Thompson, J.G. (Queen' s Univ. of Belfast (United Kingdom))

1994-11-01T23:59:59.000Z

376

Mesoscale Observations of a Prefrontal Squall Line  

Science Conference Proceedings (OSTI)

Phase I of the Cold Fronts Research Programme was carried out during November/December 1980 in south-eastern Australia. Data from a frontal event on 27 November are analyzed, with particular emphasis on a squall line that formed over the Southern ...

W. L. Physick; W. K. Downey; A. J. Troup; B. F. Ryan; P. J. Meighen

1985-11-01T23:59:59.000Z

377

Future Inspection of Overhead Transmission Lines  

Science Conference Proceedings (OSTI)

This report documents scenarios and technologies that can be applied in the future for the inspection of transmission lines. Scenarios describe the utilization of a range of concepts, including distributed sensors, unmanned airborne vehicles, RF communication, and robotics. An approach to performing demonstration projects using currently available technologies is provided and will be implemented in the following phases of the project.

2008-06-23T23:59:59.000Z

378

In-line beam current monitor  

SciTech Connect

An intense relativistic electron beam current monitor for a gas neutralized beam transport line includes a first foil for conducting plasma current to the wall where it is measured as it traverses an inductive loop formed by a cavity in the wall. An insulator foil separates the first foil from a second conducting foil which returns the current to the plasma environment.

Ekdahl, Jr., Carl A. (Albuquerque, NM); Frost, Charles A. (Albuquerque, NM)

1986-01-01T23:59:59.000Z

379

Tassel Pipeline Tutorial (Command Line Interface)  

E-Print Network (OSTI)

Tassel Pipeline Tutorial (Command Line Interface) Terry Casstevens Institute for Genomic Diversity, Cornell University May 11, 2011 #12;Tassel Pipeline Basics... · Consists of Modules (i.e. Plugins) · Output from one Module can be Input to another Module. Determined by order specified. run_pipeline

Buckler, Edward S.

380

Architecting automotive product lines: industrial practice  

Science Conference Proceedings (OSTI)

This paper presents an in-depth view of how architects work with maintaining product line architectures in the automotive industry. The study has been performed at two internationally well-known companies, one car manufacture and one commercial vehicle ... Keywords: architecting, automotive industry, case study, process

Håkan Gustavsson; Ulrik Eklund

2010-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

100-N temporary construction line considerations  

SciTech Connect

Present thinking and planning appears to be developing from the following factors as concern the 13.8 KV temporary construction power limit. 1. It is understood that the present intent is to supply 100-N operating requirements from a single stub source in the 230 KV loop. 2. The original thoughts were to obtain construction power over a 13.8 KV line from 151-D substation. 3. Construction load requirements are now less than originally planned since steam has been substituted for electrical drive of primary loop pumps and 5500 hp motor tests are no longer necessary. 4. An extreme emergency backup source for the K plants has always been of concern, although minimized in recent planning. It is desirable to review the temporary construction line requirements from a future operating viewpoint to determine if the line could be useful to the operating plants after completion of construction. It is highly desirable to provide T.C. power source from K plants rather than 151-D and then leave the line and breakers in place for future maintenance assistance and as extreme emergency backup to K plants.

Mollerus, F.J.

1958-12-30T23:59:59.000Z

382

Artistic minimal rendering with lines and blocks  

Science Conference Proceedings (OSTI)

Many non-photorealistic rendering techniques exist to produce artistic effects from given images. Inspired by various artists, interesting effects can be produced by using a minimal rendering, where the minimum refers to the number of tones as well as ... Keywords: Image abstraction, Line drawing, Non-photorealistic rendering, Tonal blocks

Paul L. Rosin, Yu-Kun Lai

2013-07-01T23:59:59.000Z

383

Developing long-term stable product line architectures  

Science Conference Proceedings (OSTI)

Product lines are usually built for the long term in order to repay the initial investment. While long-term stable software systems are already hard, if they are developed individually, it is even harder for complete product lines. At the time a new ... Keywords: AUTOSAR, multi product lines, scoping, software architecture, software product lines

Christian Tischer; Birgit Boss; Andreas Müller; Andreas Thums; Rajneesh Acharya; Klaus Schmid

2012-09-01T23:59:59.000Z

384

Sierra Pacific Power Company Alturas Transmission Line Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

transmission line to withstand expected maximum fault displacement. . ES-49 KesidualI*acf '.:, , ,,.,, .. .... ...... .. . ... . .. . .. .. . . . .. ,,. ,::.,. ,.,,, ,..,, lot...

385

Mega-scale product line engineering at General Motors  

Science Conference Proceedings (OSTI)

General Motors faces probably the most complex Systems and Software Product Line Engineering (PLE) challenges ever, in terms of product complexity, richness of variation, size of organization, and an unforgiving requirement to support over a dozen simultaneous ... Keywords: bill-of-features, feature modeling, feature profiles, hierarchical product lines, product baselines, product configurator, product line engineering, product portfolio, software product lines, variation points

Rick Flores; Charles Krueger; Paul Clements

2012-09-01T23:59:59.000Z

386

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) 2013 Annual Planning Summary for the Southwestern Area Power Administration

387

Definition: Line Transformer Monitors | Open Energy Information  

Open Energy Info (EERE)

Transformer Monitors Transformer Monitors Jump to: navigation, search Dictionary.png Line Transformer Monitors Transformer Monitoring System can monitor different aspects of transformers, including oil levels and multiple temperatures within the transformer. This allows for analysis of the health of either individual key power transformers or multiple power transformers networked in the system. For example, the transformer monitors provide transformer oil dissolved gas analysis (DGA), oil temperature, ambient temperature, and moisture in oil measurements. These measurements are made in relation to transformer load.[1] Related Terms transformer, system, transformer References ↑ https://www.smartgrid.gov/category/technology/line_transformer_monitors [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like.

388

LINE Commission Visits Idaho National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how it worked. Participants included, from top right in the INL: INL Laboratory Director John Grossenbacher; North Wind Group President Sylvia Median; former Idaho U.S. Senator Larry Craig; Idaho Department of Labor�s Dwight Johnson; BEA Government Affairs Boise Manager Brian Whitlock; and Idaho House District 33 Rep. Jeff Thompson.

389

Line-of-sight deposition method  

DOE Patents (OSTI)

A line-of-sight method of depositing a film having substantially 100% of theoretical density on a substrate. A pressure vessel contains a target source having a surface thereof capable of emitting particles therefrom and a substrate with the source surface and the substrate surface positioned such that the source surface is substantially parallel to the direction of the particles impinging upon the substrate surface, the distance between the most remote portion of the substrate surface receiving the particles and the source surface emitting the particles in a direction parallel to the substrate surface being relatively small. The pressure in the vessel is maintained less than about 5 microns to prevent scattering and permit line-of-sight deposition. By this method the angles of incidence of the particles impinging upon the substrate surface are in the range of from about 45/sup 0/ to 90/sup 0/ even when the target surface area is greatly expanded to increase the deposition rate.

Patten, J.W.; McClanahan, E.D.; Bayne, M.A.

1980-04-16T23:59:59.000Z

390

Line-of-sight deposition method  

DOE Patents (OSTI)

A line-of-sight method of depositing a film having substantially 100% of theoretical density on a substrate. A pressure vessel contains a target source having a surface thereof capable of emitting particles therefrom and a substrate with the source surface and the substrate surface positioned such that the source surface is substantially parallel to the direction of the particles impinging upon the substrate surface, the distance between the most remote portion of the substrate surface receiving the particles and the source surface emitting the particles in a direction parallel to the substrate surface being relatively small. The pressure in the vessel is maintained less than about 5 microns to prevent scattering and permit line-of-sight deposition. By this method the angles of incidence of the particles impinging upon the substrate surface are in the range of from about 45.degree. to 90.degree. even when the target surface area is greatly expanded to increase the deposition rate.

Patten, James W. (Richland, WA); McClanahan, Edwin D. (Richland, WA); Bayne, Michael A. (West Richland, WA)

1981-01-01T23:59:59.000Z

391

Multi-transmission-line-beam interactive system  

E-Print Network (OSTI)

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube (TWT) due to J.R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides for: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Alexander Figotin; Guillermo Reyes

2013-04-19T23:59:59.000Z

392

Boron-10 Lined Proportional Counter Model Validation  

SciTech Connect

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project “Coincidence Counting With Boron-Based Alternative Neutron Detection Technology” at Pacific Northwest National Laboratory (PNNL) for the development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube-based alternative system in the configuration of a coincidence counter. This report discusses the validation studies performed to establish the degree of accuracy of the computer modeling methods current used to simulate the response of boron-lined tubes. This is the precursor to developing models for the uranium neutron coincidence collar under Task 2 of this project.

Lintereur, Azaree T.; Siciliano, Edward R.; Kouzes, Richard T.

2012-06-30T23:59:59.000Z

393

Overhead Transmission Line Inspector Workshop Proceedings - 2012  

Science Conference Proceedings (OSTI)

 This report presents the proceedings of the Electric Power Research Institute (EPRI) Overhead Transmission Line Inspector Workshop, which was held Monday, July 30, through Wednesday, August 1, 2012, at the Hyatt Place Hotel and at Georgia Power’s Klondike Training Center in Lithonia, Georgia.The first half day of the workshop focused on inspection and assessment, with a participant roundtable discussion, followed by utility, vendor and EPRI presentations on the ...

2012-11-14T23:59:59.000Z

394

Guide for Successful Transmission Line Siting  

Science Conference Proceedings (OSTI)

As described in the Federal Energy Regulatory Commission (FERC) Permit Process, eminent domain proceedings are not the preferred method of obtaining rights-of-way for transmission lines. The permitting process is rather one of engaging the public through meetings and education to develop siting consensus. This approach requires an in-depth understanding of the primary technical issues by everyone involved in the siting procedures. The applicant must demonstrate due diligence in justifying the new ...

2013-12-05T23:59:59.000Z

395

Managing Transmission Line Steel Structures, Version 2  

Science Conference Proceedings (OSTI)

Utilities are under more pressure than ever to efficiently utilize existing overhead lines by optimizing their life and reliability. A key issue involves the question of how to efficiently inspect and maintain transmission systems. In light of aging transmission and distribution infrastructures, resources are needed to design and implement cost-effective assessment and maintenance programs. This valuable reference provides an in-depth look at all facets of an inspection, assessment, and maintenance progr...

2004-12-02T23:59:59.000Z

396

Guide for Successful Transmission Line Siting  

Science Conference Proceedings (OSTI)

As described in the Federal Energy Regulatory Commission (FERC) Permit Process, eminent domain proceedings are not the preferred method of obtaining rights-of-way for transmission lines. The permitting process is rather one of engaging the public through meetings and education to develop siting consensus. This approach requires an in-depth understanding of the primary technical issues by everyone involved in the siting procedures. The applicant must demonstrate due diligence in justifying the new ...

2012-11-19T23:59:59.000Z

397

A Guide for Transmission Line Voltage Upgrade  

Science Conference Proceedings (OSTI)

In the last few decades, construction of new transmission facilities has not caught up with the demand for electric power. The problem of transmission capacity shortage was further compounded by deregulation of the power industry, which allows power to be dispatched from any generation source for the lowest energy cost. As a result, lines that were not planned for these power flows may now be overloaded. A number of bottlenecks were thus created, restricting power transfer from one location to another. U...

2008-12-09T23:59:59.000Z

398

X-ray Lines in Gamma-ray Bursts and Cerenkov Line Mechanism  

E-Print Network (OSTI)

X-ray emission and absorption features are of great importance in our understanding the nature and environment of gamma-ray bursts (GRBs). So far, iron emission lines have been detected in at least four GRB afterglows. In this paper, the observational properties and physical constraints on materials surrounding GRB sources are reviewed, and several classes of theoretical models are also discussed. We will specially concentrate on the Cerenkov line mechanism, in which the broad iron lines are expected, and a small mass of Fe is required to produce the large line luminosity. In addition, our interpretation can favor the recent jet unified model for different classes of gamma-ray bursts with a standard energy reservoir.

Wei Wang

2004-07-30T23:59:59.000Z

399

Formation of Mesoscale Lines of Pirecipitation: Severe Squall Lines in Oklahoma during the Spring  

Science Conference Proceedings (OSTI)

Four distinct kinds of severe, mesoscale convective-line development are identified in Oklahoma during the spring based on the analysis of an 11-year period of reflectivity data from the National Severe Storms Laboratory's 10-cm radar in Norman, ...

Howard B. Bluestein; Michael H. Jain

1985-08-01T23:59:59.000Z

400

Formation of Mesoscale Lines of Precipitation: Nonsevere Squall Lines in Oklahoma during the Spring  

Science Conference Proceedings (OSTI)

The development of mesoscale lines of nonsevere convection in Oklahoma during the spring is discussed. This documentation complements the study by Bluestein and Jain of severe, mesoscale convective-fine development. Three major classes of squall ...

Howard B. Bluestein; Gregory T. Marx; Michael H. Jain

1987-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Solar winds along curved magnetic field lines  

E-Print Network (OSTI)

Both remote-sensing measurements using the interplanetary scintillation (IPS) technique and in situ measurements by the Ulysses spacecraft show a bimodal structure for the solar wind at solar minimum conditions. At present what makes the fast wind fast and the slow wind slow still remains to be answered. While a robust empirical correlation exists between the coronal expansion rate $f_c$ of the flow tubes and the speeds $v$ measured in situ, further data analysis suggests that $v$ depends on more than just $f_c$. We examine whether the non-radial shape of field lines, which naturally accompanies any non-radial expansion, could be an additional geometrical factor. We solved the transport equations incorporating the heating due to turbulent Alfv\\'en waves for an electron-proton solar wind along curved field lines given by an analytical magnetic field model, representative of a solar minimum corona. The field line shape is found to influence substantially the solar wind parameters, reducing the asymptotic speed ...

Li, Bo; Chen, Yao

2011-01-01T23:59:59.000Z

402

Transmission line environmental assessment guidance document  

Science Conference Proceedings (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

403

ICE LINES IN CIRCUMBINARY PROTOPLANETARY DISKS  

Science Conference Proceedings (OSTI)

I examine the position of the ice line in circumbinary disks heated by steady mass accretion and stellar irradiation and compare with the critical semimajor axis, interior to which planetary orbits are unstable. There is a critical binary separation, dependent on the binary parameters and disk properties, for which binaries with separations larger than this critical value have ice lines that lie interior to the boundary of stability. For an equal-mass binary comprised of 1 M{sub Sun} components, this critical separation is Almost-Equal-To 1.04 AU, and scales weakly with mass accretion rate and Rosseland mean opacity ({proportional_to}[ M-dot {kappa}{sub R}]{sup 2/9}). Assuming a steady mass accretion rate of M-dot {approx}10{sup -8} M{sub Sun} yr{sup -1} and a Rosseland mean opacity of {kappa}{sub R} {approx} 1 cm{sup 2} g{sup -1}, I show that {approx}> 80% of all binary systems with component masses M{sub *} {approx}ice lines that lie interior to the critical semimajor axis. This suggests that rocky planets should not form in these systems, a prediction which can be tested by looking for planets around binaries with separations larger than the critical separation with Kepler (difficult) and with microlensing.

Clanton, Christian, E-mail: clanton@astronomy.ohio-state.edu [Department of Astronomy, Ohio State University, 140 W. 18th Ave., Columbus, OH 43210 (United States)

2013-05-01T23:59:59.000Z

404

Stand-off transmission lines and method for making same  

DOE Patents (OSTI)

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress. 16 figures.

Tuckerman, D.B.

1991-05-21T23:59:59.000Z

405

Stand-off transmission lines and method for making same  

DOE Patents (OSTI)

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress.

Tuckerman, David B. (Livermore, CA)

1991-01-01T23:59:59.000Z

406

Transmission line including support means with barriers  

DOE Patents (OSTI)

A gas insulated transmission line includes an elongated outer sheath, a plurality of inner conductors disposed within and extending along the outer sheath, and an insulating gas which electrically insulates the inner conductors from the outer sheath. A support insulator insulatably supports the inner conductors within the outer sheath, with the support insulator comprising a main body portion including a plurality of legs extending to the outer sheath, and barrier portions which extend between the legs. The barrier portions have openings therein adjacent the main body portion through which the inner conductors extend.

Cookson, Alan H. (Pittsburgh, PA)

1982-01-01T23:59:59.000Z

407

On Line Power Plant Performance Monitoring  

E-Print Network (OSTI)

Maintaining efficient and reliable plant operation is a prime objective in the generation of power. These are important considerations for utilities and particularly for Independent Power Producers as they become a more significant factor in the energy supply. On Line Performance Monitoring is an effective method to improve operating efficiency, detect and correct off nominal operation and expediently analyze cause and effect component performance relationships. The heart of a Performance Monitor is a modular collection of calculations used to determine performance indices in the power plant. Calculated performance indices are used in numerous applications: 1. To measure actual component performance compared to guaranteed or expected performance 2. To identify controllable operating problems and provide operator guidance in achieving the best operation of the plant 3. To evaluate component performance and deterioration for use in a maintenance program 4. To develop cost data and incremental cost characteristics for the economic operation or dispatch of the unit with other system energy sources 5. To document plant performance compared to base line data for the demonstration of efficient operation and improved availability. This paper will discuss the many advantages associated with a Performance Monitor system, their application, the benefits which may be realized and the potential of this concept with advanced diagnostic capability.

Ahner, D. J.; Priestley, R. R.

1990-06-01T23:59:59.000Z

408

B Plant ion exchange feed line leak  

SciTech Connect

>One of the objectives of the Waste Management Program is to separate the long-lived heat emitter /aup 137/Cs from the bulk of the high-level Iiquid wastes. This separation is accomplished by the ion exchange process in the 221-B Building. Interim storage of the cesium is in solution as a nitrate. The feed for the B Plant cesinm ion exchange process is pumped from the lag storage tank, 105-C, through a pipeline and several diversion boxes to the 221-B Building. On December 19, 1969, a leak was discovered near the 241-C-152 diversion box in the section of this line, V-122, from the 105-C tank. Although the leak represented a loss of feed for the processing of /sup 137/Cs, more important was the consequence of environmental contmination to the soil from the line leak. For this reason, an investigation was made to estblish the extent of the radioactivity spread. The results of a well drilling operation undertaken to define the boundary and to estimate the extent of the leak are summarized. (CR)

Tanaka, K.H.

1971-01-25T23:59:59.000Z

409

Lorentz transformations with arbitrary line of motion  

E-Print Network (OSTI)

Sometimes it becomes a matter of natural choice for an observer (A) that he prefers a coordinate system of two-dimensional spatial x-y coordinates from which he observes another observer (B) who is moving at a uniform speed along a line of motion, which is not collinear with As chosen x or y axis. It becomes necessary in such cases to develop Lorentz transformations where the line of motion is not aligned with either the x or the y-axis. In this paper we develop these transformations and show that under such transformations, two orthogonal systems (in their respective frames) appear non-orthogonal to each other. We also illustrate the usefulness of the transformation by applying it to three problems including the rod-slot problem. The derivation has been done before using vector algebra. Such derivations assume that the axes of K and K-prime are parallel. Our method uses matrix algebra and shows that the axes of K and K-prime do not remain parallel, and in fact K and K-prime which are properly orthogonal are observed to be non-orthogonal by K-prime and K respectively. http://www.iop.org/EJ/abstract/0143-0807/28/2/004

Chandru Iyer; G. M. Prabhu

2008-09-18T23:59:59.000Z

410

COBE Observations of Interstellar Line Emission  

E-Print Network (OSTI)

The FIRAS instrument on the COBE satellite has conducted an unbiased survey of the far-infrared emission from our Galaxy. The first results of this survey were reported by Wright et al. (1991), and later conclusions were reported in Bennett et al. (1994). I report the results of analyses of this spectral survey, which includes emission lines from 158 micron C+, 122 micron and 205 micron N+, 370 micron and 609 micron neutral C, and CO J=2-1 through 5-4. The morphological distribution along the galactic plane (b=0 deg) for all the spectral line emission, and the high galactic latitude intensities of the strong C+ and 205 micron N+ emission are discussed. The high galactic latitude intensity of the 158 micron fine structure transition from C+ is I = (1.43 +/- 0.12)*1E-6 csc|b| erg/cm^2/s/sr for |b| > 15 deg and it decreases more rapidly than the far infrared intensity with increasing galactic latitude.

Edward L. Wright

1996-12-10T23:59:59.000Z

411

Cerenkov Line Emission as a Possible Mechanism of X-ray Lines in Gamma-ray Bursts  

E-Print Network (OSTI)

The recent discoveries of X-ray lines in the afterglows of gamma-ray bursts (GRBs) provide significant clues to the nature of GRB progenitors and central environments. However, the iron line interpretation by fluorescence or recombination mechanism requires a large amount of iron material. We argue that the very strong iron line could be attributed to an alternative mechanism: Cerenkov line emission since relativistic electrons and dense medium exist near GRB sites. Therefore, the broad iron lines are expected, and line intensity will be nearly independent of the iron abundance, the medium with the anomalously high Fe abundance is not required.

W. Wang; Y. Zhao; J. H. You

2002-03-14T23:59:59.000Z

412

Loss of line shutdown for line-commutated utility-interactive inverter  

SciTech Connect

The line-commutated, single-phase, utility-interactive inverter has been used in utility-connected photovoltaic (PV) and wind energy systems because it is commercially available at an attractive price. If unity power factor operation is required, a shunt capacitor can be used. This causes a problem if the utility line is disconnected; the inverter can continue to run and can thus be a hazard. This can be solved by using a fast-acting overvoltage detection circuit which operates directly on the inverter control electronics.

Landsman, E.E.

1981-03-01T23:59:59.000Z

413

EIS-0297: Notice of Intent To Prepare an Environmental Impact Statement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notice of Intent To Prepare an Environmental Impact Notice of Intent To Prepare an Environmental Impact Statement EIS-0297: Notice of Intent To Prepare an Environmental Impact Statement Proposed Griffith Power Plant and Transmission Line Project, Mohave County, AZ Western Area Power Administration (Western) intends to prepare an environmental impact statement (EIS) regarding the proposal by Griffith Energy (GE), LLC, to construct an electric generating facility on private property and to interconnect this facility with Western's system in the vicinity of Kingman, Arizona. DOE/EIS-0297, Department of Energy, Western Area Power Administration, Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Griffith Power Plant and Transmission Line Project, Mohave County, AZ, 63 FR 16496 (April 1998)

414

The Pre-storm Environment of Midlatitude Prefrontal Squall Lines  

Science Conference Proceedings (OSTI)

Composite environmental profiles Of wind and temperature are presented for squall line cases that are spatially removed from frontal disturbances. The motions of the squall lines are inferred from radar data, and the mean environmental wind ...

Jonathan Wyss; Kerry A. Emanuel

1988-03-01T23:59:59.000Z

415

E3: Success Story - Rapid-Line Inc. | Economy – Energy ...  

Science Conference Proceedings (OSTI)

... Lindquist and other Rapid-Line staff worked with the Green ... is true and not just a short-lived trend in ... Mark Lindquist, President, Rapid-Line Inc. ...

2013-11-13T23:59:59.000Z

416

Momentum Flux by Lines of Cumulonimbus over the Tropical Oceans  

Science Conference Proceedings (OSTI)

Examination of aircraft and rawinsonde data gathered in nine tropical mesoscale convective line cases indicates that all but two lines systematically increased front-to-rear momentum at heights greater than about 4 km, and rear-to-front momentum ...

Margaret A. LeMone; Gary M. Barnes; Edward J. Zipser

1984-06-01T23:59:59.000Z

417

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network (OSTI)

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

418

Part 1: The Bottom Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: The Bottom Line Part 1: The Bottom Line Question: What is different about decommissioning under CERCLA from the way DOE has decommissioned facilities in the past? Answer: DOE...

419

Numerical Simulation of a Midlatitude Squall Line in Two Dimensions  

Science Conference Proceedings (OSTI)

A two-dimensional, anelastic cloud model was used in attempts to numerically replicate the observed structure of a midlatitude squall line. Initial conditions were adapted from observations of the 22 May 1976 Oklahoma line. Model simulations were ...

Robert G. Fovell; Yoshi Ogura

1988-12-01T23:59:59.000Z

420

Discrete Propagation in Numerically Simulated Nocturnal Squall Lines  

Science Conference Proceedings (OSTI)

Simulations of a typical midlatitude squall line were used to investigate a mechanism for discrete propagation, defined as convective initiation ahead of an existing squall line leading to a faster propagation speed for the storm complex. Radar ...

Robert G. Fovell; Gretchen L. Mullendore; Seung-Hee Kim

2006-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Experimental measurements of electron scattering parameters in Cu narrow lines  

Science Conference Proceedings (OSTI)

Future generations of integrated circuits will require interconnects with metallic lines at dimensions below 50nm. When Cu is used, the electron mean free path becomes similar to the characteristic dimensions of the structure of the metallic line (grain ...

S. Maítrejean; R. Gers; T. Mourier; A. Toffoli; G. Passemard

2006-11-01T23:59:59.000Z

422

Form Follows Transit? The Blue Line Corridor's Development Potentials  

E-Print Network (OSTI)

Urotat of Conneeto i-g Lines) Dash 4/RTD 23/ Red Line RTD15 RTDI0 RTD 2 resideR’l/industr’l crosswalks depar~re? no

Loukaitou-Sideris, Anastasia; Banerjee, Tridib

1994-01-01T23:59:59.000Z

423

A Theory for Strong, Long-Lived Squall Lines  

Science Conference Proceedings (OSTI)

We study herein the mechanics of long-lived, line-oriented, precipitating cumulus convection (squall lines) using two- and three-dimensional numerical models of moist convection. These models, used in juxtaposition, enable us to address the ...

Richard Rotunno; Joseph B. Klemp; Morris L. Weisman

1988-02-01T23:59:59.000Z

424

North American Short Line and Regional Railroads Industry Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Short Line and American Short Line and Short Line and American Short Line and Regional Railroad Association Regional Railroad Association " " The Voice of America The Voice of America ' ' s Independent Railroads s Independent Railroads " " 4/27/2005 2 ASLRRA Membership ASLRRA Membership 0 100 200 300 400 500 600 700 800 Total Number of Member Companies 1943 1953 1963 1973 1983 1993 2003 Year ASLRRA Member History (1943 - 2003) Associate Railroad

425

Electric and Magnetic Field Exposure During Live Line Work  

Science Conference Proceedings (OSTI)

An employee performing work on a transmission line while that line is energized is subjected to the local electric and magnetic fields produced by the voltage and current on the line. The electric field can result in spark discharges, contact currents, and stimulation of the body hair with attendant annoyance. Magnetic fields do not result in shock phenomena, but have become of concern to some people with regard to alleged health effects. Magnetic field shielding is not practical for live line ...

2013-10-07T23:59:59.000Z

426

Focusing and matching properties of the ATR transfer line  

Science Conference Proceedings (OSTI)

The AGS to RHIC (AtR) beam transfer line has been constructed and will be used to transfer beam bunches from the AGS machine into the RHIC machine which is presently under construction at BNL. The original design of the AtR line has been modified. This article will present the optics of the various sections of the existing AtR beam line, as well as the matching capabilities of the AtR line to the RHIC machine.

Tsoupas, N.; Fischer, W.; Kewisch, J.; MacKay, W.W.; Peggs, S.; Pilat, F.; Tepikian, S.; Wei, J.

1997-07-01T23:59:59.000Z

427

SunLine Tests HHICE Bus in Desert Climate  

DOE Green Energy (OSTI)

Fact sheet describes the demonstration of a hybrid hydrogen internal combustion engine (HHICE) bus at SunLine Transit Agency.

Not Available

2006-10-01T23:59:59.000Z

428

Emergency control of synchronous and nonsynchronous tie lines  

SciTech Connect

It is shown that for power systems using ''weak'' synchronous tie lines (ac lines), by employing backup separation with a mutual angle exceeding the critical value and allocating a portion of the generators to the receiving power system, it is possible to achieve synchronous-tie emergency-control capabilities close to those provided by emergency control of a nonsynchronous tie (a line and dc link as well as a line with electromechanical converters).

Kolonskii, T.V.

1980-01-01T23:59:59.000Z

429

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Savings Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission...

430

In-Line Fluid Analysis Technology - Available Technologies ...  

Computers & Electronics; Manufacturing & Warehousing; Oil & Gas; Brochure(s) In-Line Fluid Analysis Brochure (pdf) Enabled by the Office ...

431

U.S. Energy Information Administration - EIA - Independent ...  

U.S. Energy Information Administration (EIA)

California: Electricity: ... Coal Distribution Current and Back Issues; ... Southern California Edison, Power Generation: Mohave Generation Station

432

Line Emission from Optically Thick RelativisticAccretion Tori  

SciTech Connect

We calculate line emission from relativistic accretion tori around Kerr black holes and investigate how the line profiles depend on the viewing inclination, spin of the central black hole, parameters describing the shape of the tori, and spatial distribution of line emissivity on the torus surface. We also compare the lines with those from thin accretion disks. Our calculations show that lines from tori and lines from thin disks share several common features. In particular, at low and moderate viewing inclination angles they both have asymmetric double-peaked profiles with a tall, sharp blue peak and a shorter red peak which has an extensive red wing. At high viewing inclination angles they both have very broad, asymmetric lines which can be roughly considered as single-peaked. Torus and disk lines may show very different red and blue line wings, but the differences are due to the models for relativistic tori and disks having differing inner boundary radii. Self-eclipse and lensing play some role in shaping the torus lines, but they are effective only at high inclination angles. If inner and outer radii of an accretion torus are the same as those of an accretion disk, their line profiles show substantial differences only when inclination angles are close to 90{sup o}, and those differences are manifested mostly at the central regions of the lines instead of the wings.

Fuerst, Steven V.; /KIPAC, Menlo Park /Mullard Space Sci. Lab.; Wu, Kinwah; /Mullard Space Sci. Lab.

2007-09-14T23:59:59.000Z

433

the Front Line of Medicine to Prevent Needless Work Disability  

E-Print Network (OSTI)

Preparing the Front Line of Medicine to Prevent Needless Work Disability: Private 4. Free on-line CME; "Medical Rounds" in a talk show format 3. Free live;6 Approaches 1. Sessions at exis9ng medical educa9on events 2. Offer of on-line CME training

434

An approach to architectural analysis of product lines  

Science Conference Proceedings (OSTI)

This paper addresses the issue of how to perform architectural analysis on an existing product line architecture. The con tribution of the paper is to identify and demonstrate a repeatable product line architecture analysis process. The approach defines ... Keywords: interferometry software, product lines, software architecture analysis, software archtecture

Gerald C. Gannod; Robyn R. Lutz

2000-06-01T23:59:59.000Z

435

Mexico/Central America; Trans-Mexico gas line studied  

Science Conference Proceedings (OSTI)

This paper reports that current and future pipe line activity in Mexico and Central America is at a low level, with Pemex constructing a small amount of gas transmission and liquids lines. However, plans for a trans-Mexico gas transmission line for imports and exports advance.

Not Available

1991-11-01T23:59:59.000Z

436

Ozark 260-mile gas line system completed  

Science Conference Proceedings (OSTI)

Gathering gas in the Arkoma basin of Oklahoma and Arkansas for transport to market, the 260-mile Ozark gas line system runs from southwest of McAlester, Okla., to Natural Gas Pipeline Co. of America's station at Searcy, Ark. The recently completed mainline has an initial capacity of 170 million CF/day with a maximum operating pressure of 1200 psig and a delivery pressure of 700 psig at the NGPL station. The 20-in. pipeline is API 5LX-Grade X60, 0.281-in. wall thickness for Class 1 areas, 0.344 for Class 2 areas, 0.406 for Class 3 areas, and API 5LX-Grade X52, 0.500-in. wall thickness for river crossings.

Dixon, R.R.

1982-05-01T23:59:59.000Z

437

On-line tritium production monitor  

DOE Patents (OSTI)

A scintillation optical fiber system for the on-line monitoring of nuclear reactions in an event-by-event manner is described. In the measurement of tritium production one or more optical fibers are coated with enriched .sup.6 Li and connected to standard scintillation counter circuitry. A neutron generated .sup.6 Li(n )T reaction occurs in the coated surface of .sup.6 Li-coated fiber to produce energetic alpha and triton particles one of which enters the optical fiber and scintillates light through the fiber to the counting circuit. The coated optical fibers can be provided with position sensitivity by placing a mirror at the free end of the fibers or by using pulse counting circuits at both ends of the fibers.

Mihalczo, John T. (Oak Ridge, TN)

1993-01-01T23:59:59.000Z

438

On-line process control monitoring system  

DOE Patents (OSTI)

An on-line, fiber-optic based apparatus for monitoring the concentration of a chemical substance at a plurality of locations in a chemical processing system comprises a plurality of probes, each of which is at a different location in the system, a light source, optic fibers for carrying light to and from the probes, a multiplexer for switching light from the source from one probe to the next in series, a diode array spectrophotometer for producing a spectrum from the light received from the probes, and a computer programmed to analyze the spectra so produced. The probes allow the light to pass through the chemical substance so that a portion of the light is absorbed before being returned to the multiplexer. A standard and a reference cell are included for data validation and error checking.

O' Rourke, Patrick E. (Martinez, GA); Van Hare, David R. (Aiken, SC); Prather, William S. (Augusta, GA)

1992-01-01T23:59:59.000Z

439

Power Line Calculator for Windows[trademark  

SciTech Connect

The Power Line Calculator (PLC) for Windows [trademark], version 1.0, is a program that describes the electrical characteristics of a transmission or distribution system given user-defined input. This input may consist of a combination of operating currents and phases, symmetric components, power factor, and real or reactive power. The program also allows the user to designate whether currents are present on the system neutral or in the ground. The PLC assumes that any value entered by the user remains fixed (e.g., phase current, power factor), and for underdetermined systems, basic default assumptions are incorporated: the power factor is held at or near 1.0, the net phase current is kept at or near zero, and the phase conductor currents are kept balanced. The program operates through a graphical user interface provided by Microsoft[reg sign] Windows [trademark] (version 3.1 or higher required), and the output is available in both tabular and graphic formats.

Silva, J.M. (Enertech Consultants, Campbell, CA (United States))

1992-12-01T23:59:59.000Z

440

Calibrating transport lines using LOCO techniques  

Science Conference Proceedings (OSTI)

With the 12GeV upgrade underway at CEBAF, there is a need to re-characterize the beamlines after the modifications made to it to accommodate running at higher energies. We present a linear perturbation approach to calibrating the optics model of transport lines. This method is adapted from the LOCO method in use for storage rings. We consider the effect of quadrupole errors, dipole construction errors as well as beam position monitors and correctors calibrations. The ideal model is expanded to first order in Taylor series of the quadrupole errors. A set of difference orbits obtained by exciting the correctors along the beamline is taken, yielding the measured response matrix. An iterative procedure is invoked and the quadrupole errors as well as beam position monitors and corrector calibration factors are obtained. Here we present details of the method and results of first measurements at CEBAF in early 2011.

Yves Roblin

2011-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Atomic line emission analyzer for hydrogen isotopes  

DOE Patents (OSTI)

Apparatus for isotopic analysis of hydrogen comprises a low pressure chamber into which a sample of hydrogen is introduced and then exposed to an electrical discharge to excite the electrons of the hydrogen atoms to higher energy states and thereby cause the emission of light on the return to lower energy states, a Fresnel prism made at least in part of a material anomalously dispersive to the wavelengths of interest for dispersing the emitted light, and a photodiode array for receiving the dispersed light. The light emitted by the sample is filtered to pass only the desired wavelengths, such as one of the lines of the Balmer series for hydrogen, the wavelengths of which differ slightly from one isotope to another. The output of the photodiode array is processed to determine the relative amounts of each isotope present in the sample. Additionally, the sample itself may be recovered using a metal hydride.

Kronberg, James W. (108 Independent Blvd., Aiken, SC 29801)

1993-01-01T23:59:59.000Z

442

Atomic line emission analyzer for hydrogen isotopes  

DOE Patents (OSTI)

Apparatus for isotopic analysis of hydrogen comprises a low pressure chamber into which a sample of hydrogen is introduced and then exposed to an electrical discharge to excite the electrons of the hydrogen atoms to higher energy states and thereby cause the emission of light on the return to lower energy states, a Fresnel prism made at least in part of a material anomalously dispersive to the wavelengths of interest for dispersing the emitted light, and a photodiode array for receiving the dispersed light. The light emitted by the sample is filtered to pass only the desired wavelengths, such as one of the lines of the Balmer series for hydrogen, the wavelengths of which differ slightly from one isotope to another. The output of the photodiode array is processed to determine the relative amounts of each isotope present in the sample. Additionally, the sample itself may be recovered using, a metal hydride.

Kronberg, J.W.

1991-05-08T23:59:59.000Z

443

Atomic line emission analyzer for hydrogen isotopes  

DOE Patents (OSTI)

Apparatus for isotopic analysis of hydrogen comprises a low pressure chamber into which a sample of hydrogen is introduced and then exposed to an electrical discharge to excite the electrons of the hydrogen atoms to higher energy states and thereby cause the emission of light on the return to lower energy states, a Fresnel prism made at least in part of a material anomalously dispersive to the wavelengths of interest for dispersing the emitted light, and a photodiode array for receiving the dispersed light. The light emitted by the sample is filtered to pass only the desired wavelengths, such as one of the lines of the Balmer series for hydrogen, the wavelengths of which differ slightly from one isotope to another. The output of the photodiode array is processed to determine the relative amounts of each isotope present in the sample. Additionally, the sample itself may be recovered using a metal hydride.

Kronberg, J.W.

1993-03-30T23:59:59.000Z

444

Dispersion-free radial transmission lines  

SciTech Connect

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

445

Second Line of Defense Spares Program Assessment  

SciTech Connect

The Office of the Second Line of Defense (SLD) is part of the Department of Energy‘s (DOE) National Nuclear Security Administration (NNSA). The SLD Program accomplishes its critical global security mission by forming cooperative relationships with partner countries to install passive radiation detection systems that augment traditional inspection and law enforcement measures by alerting border officials to the presence of special nuclear or other radiological materials in cross-border traffic. An important tenet of the program is to work collaboratively with these countries to establish the necessary processes, procedures, infrastructure and conditions that will enable them to fully assume the financial and technical responsibilities for operating the equipment. As the number of operational deployments grows, the SLD Program faces an increasingly complex logistics process to promote the timely and efficient supply of spare parts.

Henderson, Dale L.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.

2012-11-20T23:59:59.000Z

446

Nonlinear transmission line based electron beam driver  

Science Conference Proceedings (OSTI)

Gated field emission cathodes can provide short electron pulses without the requirement of laser systems or cathode heating required by photoemission or thermionic cathodes. The large electric field requirement for field emission to take place can be achieved by using a high aspect ratio cathode with a large field enhancement factor which reduces the voltage requirement for emission. In this paper, a cathode gate driver based on the output pulse train from a nonlinear transmission line is experimentally demonstrated. The application of the pulse train to a tufted carbon fiber field emission cathode generates short electron pulses. The pulses are approximately 2 ns in duration with emission currents of several mA, and the train contains up to 6 pulses at a frequency of 100 MHz. Particle-in-cell simulation is used to predict the characteristic of the current pulse train generated from a single carbon fiber field emission cathode using the same technique.

French, David M.; Hoff, Brad W.; Tang Wilkin; Heidger, Susan; Shiffler, Don [Directed Energy Directorate, Air Force Research Laboratory, Kirtland AFB, New Mexico 87117 (United States); Allen-Flowers, Jordan [Program in Applied Mathematics, University of Arizona, Tucson, Arizona 85721 (United States)

2012-12-15T23:59:59.000Z

447

On-Line Determination of the MTC 1 On-Line Determination of the MTC (Moderator  

E-Print Network (OSTI)

at the PWR nuclear power plant. Ann. Nucl. Energy 24: 55-64 16. Laggiard E and Runkel J (1997) Evaluation coefficient in operating nuclear power plant. In: SMORN VII, June 19-23, 1995, Avignon, France, pp 41-47 23 measurements taken at an operating power plant. #12;On-Line Determination of the MTC 11 3.1 Description

Demazière, Christophe

448

A Refined Method of Parameterizing Absorption Coefficients among Multiple Gases Simultaneously from Line-by-Line Data  

Science Conference Proceedings (OSTI)

An extension of the correlated-k distribution method that uses spectral-mapping techniques was derived to parameterize line-by-line absorption coefficients for multiple gases simultaneously for use in three-dimensional atmospheric models. In a ...

Mark Z. Jacobson

2005-02-01T23:59:59.000Z

449

EPRI Transmission Line Reference Book: 115-345 kV Compact Line Design, The Blue Book  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines.

2008-11-05T23:59:59.000Z

450

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

451

Analysis of magnetic fields produced far from electric power lines  

Science Conference Proceedings (OSTI)

In this paper, the authors develop a simple and general method for analyzing the magnetic fields produced by power lines at far distances, that is, at distances large in comparison to the spacing between the line's phase conductors. Magnetic fields produced far from conventional power lines have remarkably simple properties. The authors present formulae for the fields produced by various conventional and unconventional power line configurations; included are line designs characterized by reduced magnetic-field levels. Errors in the formulae are less than [plus minus]10% at the edge of a typical transmission right-of-way.

Kaune, W.T. (Enertech Consultants Campbell, CA (United States)); Zaffanella, L.E. (High Voltage Transmission Research Center, Lenox, MA (United States))

1992-10-01T23:59:59.000Z

452

Easing the burden of fixed telephone lines on small-scale entrepreneurs in Nigeria: GSM lines to the rescue  

Science Conference Proceedings (OSTI)

The study reported in this paper investigated the socio-economic characteristics of the adopters of GSM lines and the factors determining the adoption of GSM lines by small-scale entrepreneurs in a major Nigerian city (Ibadan). The results of the study ... Keywords: GSM lines, Nigeria, Small-scale entrepreneurs, Technology adoption

John Olatunji Adeoti; Adetola Ibidunni Adeoti

2008-02-01T23:59:59.000Z

453

Definition: Automated Feeder And Line Switching | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Automated Feeder And Line Switching Jump to: navigation, search Dictionary.png Automated Feeder And Line Switching Automated feeder and line switching is realized through automatic isolation and reconfiguration of faulted segments of distribution feeders or transmission lines via sensors, controls, switches, and communications systems. These devices can operate autonomously in response to local events or in response to signals from a central control system.[1] Related Terms transmission lines, transmission line References ↑ SmartGrid.gov 'Description of Functions' An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Automated_Feeder_And_Line_Switching&oldid=480562"

454

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland

455

Green Power Transmission Line Given New Life | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life March 11, 2010 - 4:34pm Addthis Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Stephen Graff Former Writer & editor for Energy Empowers, EERE Thanks to funds from the American Recovery and Reinvestment Act, construction of a green power transmission line stretching from Lethbridge, Alberta in Canada, down to Great Falls, Mont., was put back on track after a bank failure. Currently under construction, the Montana-Alberta Tie Line, which is owned by Toronto-based Tonbridge Power, will connect the electricity markets of

456

Proposed Project: Plains & Eastern Clean Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Proposed Project: Plains & Eastern Clean Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line's proposal was responsive to the RFP, and it is currently under consideration. The proposed Plains & Eastern Clean Line project (the proposed project) would include an overhead +/- 600 kV direct current electric transmission system and associated facilities with the capacity to deliver approximately

457

Method for bonding a transmission line to a downhole tool  

SciTech Connect

An apparatus for bonding a transmission line to the central bore of a downhole tool includes a pre-formed interface for bonding a transmission line to the inside diameter of a downhole tool. The pre-formed interface includes a first surface that substantially conforms to the outside contour of a transmission line and a second surface that substantially conforms to the inside diameter of a downhole tool. In another aspect of the invention, a method for bonding a transmission line to the inside diameter of a downhole tool includes positioning a transmission line near the inside wall of a downhole tool and placing a mold near the transmission line and the inside wall. The method further includes injecting a bonding material into the mold and curing the bonding material such that the bonding material bonds the transmission line to the inside wall.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2007-11-06T23:59:59.000Z

458

Strategy for Updating EPRI's Transmission Line Reference Book: 115-138-kV Compact Line Design ("The Blue Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a new, updated edition of the Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was originally published in 1978. The new edition will provide the most up-to-date technical information and practices on the design and maintenance of compact overhead lines. It will enable energy companies to construct cost-effective compact lines that produce optimal performances and to address the ability to maintain compact lines w...

2006-10-30T23:59:59.000Z

459

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Grand Coulee-Creston  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Grand Coulee-Creston Transmission Line Rebuild Project Draft Environmental Assessment December 2013 DOE/EA-1950 Grand Coulee-Creston Transmission Line Rebuild Project Draft Environmental Assessment December 2013 DOE/EA-1950 This page left intentionally blank. Grand Coulee-Creston Transmission Line Rebuild Project i

460

Boron-Lined Neutron Detector Measurements  

Science Conference Proceedings (OSTI)

Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. The currently deployed radiation portal monitors (RPMs) from Ludlum and Science Applications International Corporation (SAIC) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large neutron detector. There is a declining supply of 3He in the world, and thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Four technologies have been identified as being currently commercially available, potential alternative neutron detectors to replace the use of 3He in RPMs. Reported here are the results of tests of a newly designed boron-lined proportional counter option. This testing measured the neutron detection efficiency and gamma ray rejection capabilities of a system manufactured by Reuter Stokes.

Lintereur, Azaree T.; Kouzes, Richard T.; Ely, James H.; Erikson, Luke E.; Siciliano, Edward R.

2009-11-02T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Boron-Lined Neutron Detector Measurements  

Science Conference Proceedings (OSTI)

PNNL-18938 Revision Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. The currently deployed radiation portal monitors (RPMs) from Ludlum and Science Applications International Corporation (SAIC) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large neutron detector. There is a declining supply of 3He in the world, and thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Four technologies have been identified as being currently commercially available, potential alternative neutron detectors to replace the use of 3He in RPMs. Reported here are the results of tests of a newly designed boron-lined proportional counter option. This testing measured the neutron detection efficiency and gamma ray rejection capabilities of two successive prototypes of a system manufactured by GE Reuter Stokes.

Lintereur, Azaree T.; Kouzes, Richard T.; Ely, James H.; Erikson, Luke E.; Siciliano, Edward R.; Woodring, Mitchell L.

2010-03-07T23:59:59.000Z

462

Contingency Analysis of Cascading Line Outage Events  

SciTech Connect

As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

2011-03-01T23:59:59.000Z

463

Tempest gas turbine extends EGT product line  

SciTech Connect

With the introduction of the 7.8 MW (mechanical output) Tempest gas turbine, ECT has extended the company`s line of its small industrial turbines. The new Tempest machine, featuring a 7.5 MW electric output and a 33% thermal efficiency, ranks above the company`s single-shaft Typhoon gas turbine, rated 3.2 and 4.9 MW, and the 6.3 MW Tornado gas turbine. All three machines are well-suited for use in combined heat and power (CHP) plants, as demonstrated by the fact that close to 50% of the 150 Typhoon units sold are for CHP applications. This experience has induced EGT, of Lincoln, England, to announce the introduction of the new gas turbine prior to completion of the testing program. The present single-shaft machine is expected to be used mainly for industrial trial cogeneration. This market segment, covering the needs of paper mills, hospitals, chemical plants, ceramic industry, etc., is a typical local market. Cogeneration plants are engineered according to local needs and have to be assisted by local organizations. For this reason, to efficiently cover the world market, EGT has selected a number of associates that will receive from Lincoln completely engineered machine packages and will engineer the cogeneration system according to custom requirements. These partners will also assist the customer and dispose locally of the spares required for maintenance operations.

Chellini, R.

1995-07-01T23:59:59.000Z

464

Second Line of Defense Spares Program  

Science Conference Proceedings (OSTI)

During Fiscal Year 2012, a team from the Pacific Northwest National Laboratory (PNNL) conducted an assessment and analysis of the Second Line of Defense (SLD) Sustainability spare parts program. Spare parts management touches many aspects of the SLD Sustainability Program including contracting and integration of Local Maintenance Providers (LMP), equipment vendors, analyses and metrics on program performance, system state of health, and maintenance practices. Standardized spares management will provide better data for decisions during site transition phase and will facilitate transition to host country sustainability ownership. The effort was coordinated with related SLD Sustainability Program initiatives, including a configuration items baselining initiative, a metrics initiative, and a maintenance initiative. The spares study has also led to pilot programs for sourcing alternatives that include regional intermediate inventories and partnering agreements that leverage existing supply chains. Many partners from the SLD Sustainability program contributed to and were consulted in the course of the study. This document provides a description of the findings, recommendations, and implemented solutions that have resulted from the study.

Henderson, Dale L.; Holmes, Aimee E.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.; Thorsen, Darlene E.

2012-11-20T23:59:59.000Z

465

Coupling Measurements in ATF2 Extraction Line  

SciTech Connect

The purpose of ATF2 is to deliver a beam with stable very small spotsizes as required for future linear colliders such as ILC or CLIC. To achieve that, precise controls of aberrations such as dispersion and coupling are necessary. Theoretically, the complete reconstruction of the beam matrix is possible from the measurements of horizontal, vertical and tilted beam sizes, combining skew quadrupole scans at several wire-scanner positions. Such measurements were performed in the extraction line (EXT) of ATF2 in May 2009. We present analysis results attempting to resolve the 4 x 4 beam matrix. We aimed to reconstruct the full beam matrix using only skew quadrupole scans at different EXT wire-scanner locations, with measurements of horizontal, vertical and two tilted beam size projections. Checking the coherence of the {sigma}{sub 13} reconstruction from the {sigma}{sub 80{sup o}} and the {sigma}{sub 100{sup o}} measurements was essential to perform this analysis. We have shown that reconstruction of the coupling element can not be performed independantly of the 4 x 4 diagonal ones since it leads to unphysical results. A more accurate and automatisable method was find, leading to physical beam matrix reconstruction, compatible with the measurements. Another analysis should be performed based on a larger number of data sets to minimise statistical errors.

Rimbault, Cecile; /Orsay, LAL; Kuroda, Shigeru; /KEK, Tsukuba; Tauchi, Toshiaki; /KEK, Tsukuba; Terunuma, Nobuhiro; /KEK, Tsukuba; White, Glen; /SLAC; Woodley, Mark; /SLAC

2012-06-29T23:59:59.000Z

466

The transcriptional diversity of 25 Drosophila cell lines  

SciTech Connect

Drosophila melanogaster cell lines are important resources for cell biologists. Here, we catalog the expression of exons, genes, and unannotated transcriptional signals for 25 lines. Unannotated transcription is substantial (typically 19% of euchromatic signal). Conservatively, we identify 1405 novel transcribed regions; 684 of these appear to be new exons of neighboring, often distant, genes. Sixty-four percent of genes are expressed detectably in at least one line, but only 21% are detected in all lines. Each cell line expresses, on average, 5885 genes, including a common set of 3109. Expression levels vary over several orders of magnitude. Major signaling pathways are well represented: most differentiation pathways are ‘‘off’’ and survival/growth pathways ‘‘on.’’ Roughly 50% of the genes expressed by each line are not part of the common set, and these show considerable individuality. Thirty-one percent are expressed at a higher level in at least one cell line than in any single developmental stage, suggesting that each line is enriched for genes characteristic of small sets of cells. Most remarkable is that imaginal discderived lines can generally be assigned, on the basis of expression, to small territories within developing discs. These mappings reveal unexpected stability of even fine-grained spatial determination. No two cell lines show identical transcription factor expression. We conclude that each line has retained features of an individual founder cell superimposed on a common ‘‘cell line‘‘ gene expression pattern. Wereport the transcriptional profiles of 25 Drosophila melanogaster cell lines, principally by whole-genome tiling microarray analysis of total RNA, carried out as part of the modENCODE project. The data produced in this study add to our knowledge of the cell lines and of the Drosophila transcriptome in several ways. We summarize the expression of previously annotated genes in each of the 25 lines with emphasis on what those patterns reveal about the origins of the lines and the stability of spatial expression patterns. We also offer an initial analysis of previously unannotated transcripts in the cell lines.

Cherbas, Lucy; Willingham, Aarron; Zhang, Dayu; Yang, Li; Zou, Yi; Eads, Brian D.; Carlson, Joseph W.; Landolin, Jane M.; Kapranov, Philipp; Dumais, Jacqueline; Samsonova, Anastasia; Choi, Jeong-Hyeon; Roberts, Johnny; Davis, Carrie A.; Tang, Haixu; van Baren, Marijke J.; Ghosh, Srinka; Dobin, Alexander; Bell, Kim; Lin, Wei; Langton, Laura; Duff, Michael O.; Tenney, Aaron E.; Zaleski, Chris; Brent, Michael R.; Hoskins, Roger A.; Kaufman, Thomas C.; Andrews, Justen; Graveley, Brenton R.; Perrimon, Norbert; Celniker, Susan E.; Gingeras, Thomas R.; Cherbas, Peter

2010-11-15T23:59:59.000Z

467

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

468

Definition: Transmission Line Monitoring System | Open Energy Information  

Open Energy Info (EERE)

Monitoring System Monitoring System Jump to: navigation, search Dictionary.png Transmission Line Monitoring System Hardware, software, including sensors for voltage, current, temperature, mechanical load, wind speed, or other electrical or environmental parameters, including synchrophasors. These systems are designed to provide precise information that determine the operating conditions and ratings of transmission lines. Such a system can monitor line conditions and alert grid operators of trouble.[1] Related Terms transmission lines, transmission line References ↑ https://www.smartgrid.gov/category/technology/transmission_line_monitoring_system [[Ca LikeLike UnlikeLike You like this.Sign Up to see what your friends like. tegory: Smart Grid Definitionssmart grid,smart grid, |Template:BASEPAGENAME]]smart grid,smart grid,

469

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

470

Florida Electric Transmission Line Siting Act (Florida) | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Act (Florida) Electric Transmission Line Siting Act (Florida) Florida Electric Transmission Line Siting Act (Florida) < Back Eligibility Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection The Transmission Line Siting Act (TLSA) is the state's centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15 miles or longer. An

471

Federal Line Management Oversight of Department of Energy Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

G 226.1-2, Federal Line Management Oversight of DOE Nuclear Facilities G 226.1-2, Federal Line Management Oversight of DOE Nuclear Facilities Enforcement and Oversight HSS Home Contact Us Federal Line Management Oversight of Department of Energy Nuclear Facilities Purpose This Guide provides U.S. Department of Energy (DOE) line management organizations with guidance that may be useful to them in effectively and efficiently implementing the requirements of DOE O 226.1B, Implementation of Department of Energy Oversight Policy, dated April 25, 2011, as applied to Federal line management of hazard category 1, 2, and 3 nuclear facilities. Policy - P 226.1B, Department of Energy Oversight Policy Order - O 226.1B, Implementation of Department of Energy Oversight Policy Guide - G 226.1-2, Federal Line Management Oversight of DOE Nuclear Facilities

472

Hyperreal Waves on Transfinte, Terminated, Distortionless and Lossless, Transmission Lines  

E-Print Network (OSTI)

A prior work (see Chapter 8 of the book, ``Graphs and Networks: Transfinite and Nonstandard,'' Birkhauser-Boston, Cambridge, Mass., USA, 2004) examined the propagation of an electromagnetic wave on a transfinite transmission line, transfinite in the sense that infinitely many one-way infinite transmission lines are connected in cascade. That there are infinitely many such one-way infinite lines results in the wave propagating without ever reflecting at some discontinuity. The present work examines the cascade where the cascade terminates after only finitely many one-way infinite transmission lines, with the result that reflected waves are now produced at both the far end as well as at the initial end of the transfinite transmission line. The question of whether the reflected waves are infini tesimal or appreciable and whether they sum to an infinitesimal or appreciable amount are resolved for both distortionless and lossless lines. Finally, the generalizations to higher ranks of transfiniteness is briefly summarized.

A. H. Zemanian

2004-06-10T23:59:59.000Z

473

Living and Working Safely Around High-Voltage Power Lines.  

Science Conference Proceedings (OSTI)

High-voltage transmission lines can be just as safe as the electrical wiring in the homes--or just as dangerous. The crucial factor is ourselves: they must learn to behave safely around them. This booklet is a basic safety guide for those who live and work around power lines. It deals primarily with nuisance shocks due to induced voltages, and with potential electric shock hazards from contact with high-voltage lines. References on possible long-term biological effects of transmission lines are shown. In preparing this booklet, the Bonneville Power Administration has drawn on more than 50 years of experience with high-voltage transmission. BPA operates one of the world`s largest networks of long-distance, high-voltage lines. This system has more than 400 substations and about 15,000 miles of transmission lines, almost 4,400 miles of which are operated at 500,000 volts.

United States. Bonneville Power Administration.

2001-06-01T23:59:59.000Z

474

Sensor, method and system of monitoring transmission lines  

SciTech Connect

An apparatus, method, and system for measuring the magnetic field produced by phase conductors in multi-phase power lines. The magnetic field measurements are used to determine the current load on the conductors. The magnetic fields are sensed by coils placed sufficiently proximate the lines to measure the voltage induced in the coils by the field without touching the lines. The x and y components of the magnetic fields are used to calculate the conductor sag, and then the sag data, along with the field strength data, can be used to calculate the current load on the line and the phase of the current. The sag calculations of this invention are independent of line voltage and line current measurements. The system applies a computerized fitter routine to measured and sampled voltages on the coils to accurately determine the values of parameters associated with the overhead phase conductors.

Syracuse, Steven J.; Clark, Roy; Halverson, Peter G.; Tesche, Frederick M.; Barlow, Charles V.

2012-10-02T23:59:59.000Z

475

Radio frequency communication system utilizing radiating transmission lines  

DOE Patents (OSTI)

A radio communication system for use in tunnels, mines, buildings or other shielded locations in which a pair of radiating transmission lines (30), (31) extend through such location in spaced coextensive relation to each other. Each transmission line (30), (31) has at least one unidirectional amplifier (32), (33) interposed therein with the sense of the unidirectional amplifier (32) of one transmission line (30) being opposite to the sense of the unidirectional amplifier (33) of the other transmission line (31). Each of the amplifiers (32), (33) has a gain which is less than the coupling loss between the transmission lines (30), (31). Two or more mobile transceivers (35) in the location served by the system are coupled to the transmission lines (30), (31) by electromagnetic wave propagation in space in order to communicate directly with each other at a given radio frequency within the frequency range of the system.

Struven, Warren C. (San Carlos, CA)

1984-01-01T23:59:59.000Z

476

EIS-0441: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Final Environmental Impact Statement 1: Final Environmental Impact Statement EIS-0441: Final Environmental Impact Statement This EIS, prepared by the Bureau of Land Management with DOE's Western Area Power Administration as a cooperating agency, evaluates the potential environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western's transmission lines. The project website is http://www.blm.gov/az/st/en/prog/energy/wind/mohave.html EIS-0441: Final Environmental Impact Statement More Documents & Publications EIS-0403: Final Programmatic Environmental Impact Statement EIS-0448: Final Environmental Impact Statement EA-1689: Final Environmental Assessment

477

EIS-0441: Final Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41: Final Environmental Impact Statement 41: Final Environmental Impact Statement EIS-0441: Final Environmental Impact Statement This EIS, prepared by the Bureau of Land Management with DOE's Western Area Power Administration as a cooperating agency, evaluates the potential environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western's transmission lines. The project website is http://www.blm.gov/az/st/en/prog/energy/wind/mohave.html EIS-0441: Final Environmental Impact Statement More Documents & Publications EIS-0448: Final Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement EA-1665: Draft Environmental Assessment

478

Sagging Line Mitigator (SLiM) Full-Scale Demonstration  

Science Conference Proceedings (OSTI)

High conductor temperature operations cause excessive sag on transmission lines and thus limit ampacity. The Sagging Line Mitigator (SLiM) is a new class of transmission line hardware that fixes this problem in real time. In response to high conductor temperatures, SLiM decreases the effective length of conductor in the span. This mitigates the thermal expansion experienced by the conductor and reduces or eliminates excess sag. In this demonstration study, a preproduction SLiM device reliably reduced exc...

2005-02-22T23:59:59.000Z

479

Emerging and Future Inspection of Overhead Transmission Lines  

Science Conference Proceedings (OSTI)

This technical update report describes research by the Electric Power Research Institute (EPRI) into emerging and future overhead electric transmission line inspection and assessment technologies. In 2008, EPRI published a report entitled Future Inspection of Overhead Transmission Lines (product 1016921) that documented scenarios and viable technologies that could be applied for the inspection of transmission lines over a multi-decade timeframe. That document was intended to provide a roadmap for near- a...

2011-12-22T23:59:59.000Z

480

Field Guide: Transmission Line Aerial Marking and Lighting  

Science Conference Proceedings (OSTI)

Electric transmission lines and wild birds must co-exist. Power lines traverse birds' flight routes, birds commonly roost on lines and poles, and birds make their nests—the largest of which weigh thousands of pounds—on transmission structures. Some avian activities can have deleterious effects on outdoor structures and transmission—for example, nests have been known to collapse and span critical clearances during storms, resulting in outages. Accordingly, it is important for ...

2013-11-22T23:59:59.000Z

Note: This page contains sample records for the topic "line rebuild mohave" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

High-Voltage Direct Current Line Conductor Optimization  

Science Conference Proceedings (OSTI)

Overhead transmission lines are designed to last for 40 years. Many ac lines in service today in North America are 70 or more years old. This survival rate is a result of conservative utility design practices and detailed product specifications. This reliability record has occurred despite a wide range of conductor types and sizes. In the present transmission system, there are far fewer high-voltage direct current (HVDC) lines, but those that have been designed and built have been similarly successful in...

2011-12-21T23:59:59.000Z

482

TRANSPORT OF WASTE SIMULANTS IN PJM VENT LINES  

Science Conference Proceedings (OSTI)

The experimental work was conducted to determine whether there is a potential for waste simulant to transport or 'creep' up the air link line and contaminate the pulse jet vent system, and possibly cause long term restriction of the air link line. Additionally, if simulant creep occurred, establish operating parameters for washing down the line. The amount of the addition of flush fluids and mixer downtime must be quantified.

Qureshi, Z

2007-02-21T23:59:59.000Z

483

Inertial confinement fusion method producing line source radiation fluence  

DOE Patents (OSTI)

An inertial confinement fusion method in which target pellets are imploded in sequence by laser light beams or other energy beams at an implosion site which is variable between pellet implosions along a line. The effect of the variability in position of the implosion site along a line is to distribute the radiation fluence in surrounding reactor components as a line source of radiation would do, thereby permitting the utilization of cylindrical geometry in the design of the reactor and internal components.

Rose, Ronald P. (Peters Township, Washington County, PA)

1984-01-01T23:59:59.000Z

484

Spectral Line Shapes as a Diagnostic Tool in Magnetic Fusion  

DOE Green Energy (OSTI)

Spectral line shapes and intensities are used for obtaining information on the various regions of magnetic fusion devices. Emission from low principal quantum numbers of hydrogen isotopes is analyzed for understanding the complex recycling mechanism. Lines emitted from high principal quantum numbers of hydrogen and helium are dominated by Stark effect, allowing an electronic density diagnostic in the divertor. Intensities of lines emitted by impurities are fitted for a better knowledge of ion transport in the confined plasma.

Stamm, R; Capes, H; Demura, A; Godbert-Mouret, L; Koubiti, M; Marandet, Y; Mattioli, M; Rosato, J; Rosmej, F; Fournier, K B

2006-07-22T23:59:59.000Z

485

DOE-EPRI On-Line Monitoring Implementation Guidelines  

SciTech Connect

OAK B139 Industry and EPRI experience at several plants has shown on-line monitoring to be very effective in identifying out-of-calibration instrument channels or indications of equipment-degradation problems. The EPRI implementation project for on-line monitoring has demonstrated the feasibility of on-line monitoring at several participating nuclear plants. The results have been very encouraging, and substantial progress is anticipated in the coming years.

E. Davis; R. Bickford

2003-01-02T23:59:59.000Z

486

Authorization of Line Extension (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Authorization of Line Extension (Nebraska) Authorization of Line Extension (Nebraska) Authorization of Line Extension (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Line Extension Analysis Provider Nebraska Public Power District Any entity permitted to establish an electric light and power plant, and/or

487

An Exact Algorithm for Power Grid Interdiction Problem with Line ...  

E-Print Network (OSTI)

Jan 10, 2012 ... An Exact Algorithm for Power Grid Interdiction Problem with Line Switching. Long Zhao(longzhao ***at*** mail.usf.edu) Bo Zeng(bzeng ***at*** ...

488

Line Management Understanding of QA and Oversight | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

work being done correctly, timely, and safely. Input could be from recent assessments, trends, Performance Metrics, number of open action items, recurring issues, etc. Line...

489

Electrical and Biological Effects of Transmission Lines: A Review.  

Science Conference Proceedings (OSTI)

This review describes the electrical properties of a-c and d-c transmission lines and the resulting effects on plants, animals, and people. Methods used by BPA to mitigate undesirable effects are also discussed. Although much of the information in this review pertains to high-voltage transmission lines, information on distribution lines and electrical appliances is included. The electrical properties discussed are electric and magnetic fields and corona: first for alternating-current (a-c) lines, then for direct current (d-c).

Lee, Jack M.

1989-06-01T23:59:59.000Z

490

Experimental Stark Widths and Shifts for Spectral Lines of ...  

Science Conference Proceedings (OSTI)

... ?, Glenzer et al.;11 and , Blagojevic et al.10 Error flags are calculated ... the 5383 Å line of Fe I obtained from numerous shock-tube measurements.21 ...

2008-06-09T23:59:59.000Z

491

Historical Time Line and Information About the Hanford Site  

SciTech Connect

Historical time line of the Hanford Site spanning from 1940 through 1997, including photographs and other information regarding the town sites and living conditions.

Briggs Jr, David

2001-03-07T23:59:59.000Z

492

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge...

493

NIST: Atomic Spectra Database - Spectral Lines Help File  

Science Conference Proceedings (OSTI)

... display all lines of data meeting the search criteria, regardless ... Terms,; Energies, and; J values. ... Form, to specify an element, simply enter the element ...

494

Power outages often spur questions around burying power lines ...  

U.S. Energy Information Administration (EIA)

Despite the cost, underground power lines are often found in urban areas, where the density of the required overhead wire would cause significant obstructions.

495

The impact on transmission line terminations on radiated emissions.  

E-Print Network (OSTI)

??Terminating transmission lines at either the source or the load end with a damping resistor is frequently used to improve the signal integrity of clock… (more)

Wong, Wei-Juet

2007-01-01T23:59:59.000Z

496

EPRI-GTC Overhead Electric Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

This report explains and documents a standardized process that utilities could use to improve the way transmission line routes are evaluated and selected.

2006-02-06T23:59:59.000Z

497

EIS-0442: Forest Service Reauthorization of Transmission Lines...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utah and Nebraska for Routine Maintenance Practices including Changes in Vegetation Management EIS-0442: Forest Service Reauthorization of Transmission Lines on Forest Service...

498

Application Filling Requirements for Transmission Line and Substation...  

Open Energy Info (EERE)

icon Twitter icon Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) This is the approved revision of this page, as...

499

Thermal Design of Refractory Lined Pressure Oxidation Autoclaves  

Science Conference Proceedings (OSTI)

... for designing a refractory lining as a thermal barrier in pressure oxidation autoclaves. ... Incorporating Radiant Heat Exchange into Finite Element Models of ...

500

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY:...