Powered by Deep Web Technologies
Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

2

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

3

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

4

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

5

Project Selection - Record Keeping  

E-Print Network [OSTI]

4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

6

Project Records Information System (PRIS)  

SciTech Connect (OSTI)

The Project Records Information System (PRIS) is an interactive system developed for the Information Services Division (ISD) of Martin Marietta Energy Systems, Inc., to perform indexing, maintenance, and retrieval of information about Engineering project record documents for which they are responsible. This PRIS User's Manual provides instruction on the use of this system. This manual presents an overview of PRIS, describing the system's purpose; the data that it handles; functions it performs; hardware, software, and access; and help and error functions. This manual describes the interactive menu-driven operation of PRIS. Appendixes A, B, C, and D contain the data dictionary, help screens, report descriptions, and a primary menu structure diagram, respectively.

Smith, P.S.; Schwarz, R.K.

1990-11-01T23:59:59.000Z

7

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Broader source: Energy.gov (indexed) [DOE]

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

8

Line Rebuild, Relocation and Substation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Palisades-Goshen Rebuild Wind Projects Line Rebuild, Relocation and Substation Projects BPA has identified several critical rebuild and substation projects...

9

Year 2000 Project Records.doc  

Broader source: Energy.gov (indexed) [DOE]

DISPOSITION SCHEDULE DISPOSITION SCHEDULE Year 2000 Project Records 1/22/01 Year 2000 (Y2K) Project records have been created to document the effort of the Department of Energy to ensure that its information systems are Y2K compliant, i.e., able to perform all functions and applications when encountering dates beyond December 31, 1999. The records which document the overall Departmental and Field Office efforts, including design and modification work, are considered to be technologically significant. Some warrant permanent retention. The record keeping copy of the records identified in Item 1a of the schedule will be collected and maintained for the Department at DOE/HQ. Specific computer system documentation for the creation, modification, maintenance and testing of the systems will

10

line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

along the existing along the existing Empire-EDS 11S-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Empire-ED5 115-kV transmission line, within Western's existing right-of-way. This will include the rebuild of 9.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system.

11

Proposed Project: Plains & Eastern Clean Line  

Broader source: Energy.gov [DOE]

On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line’s proposal was responsive to the RFP, and it is currently under consideration.

12

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

13

Libby-Troy Line Rebuild Project - July 25, 2008  

Broader source: Energy.gov (indexed) [DOE]

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

14

Project Records Information System (PRIS) user's manual  

SciTech Connect (OSTI)

The Projects Record Information System (PRIS) is an interactive system developed for the Information Services Division (ISD) of Martin Marietta Energy Systems, Inc., to perform indexing, maintenance, and retrieval of information about Engineering project record documents for which they are responsible. This PRIS User's Manual provides instruction on the use of this system. Section 2.0 of this manual presents an overview of PRIS, describing the system's purpose; the data that it handles, functions it performs; hardware, software, and access; and help and error functions. Section 3.0 describes the interactive menu-driven operation of PRIS. Appendixes A, B,C, and D contain the data dictionary, help screens, report descriptions, and a primary menu structure diagram, respectively.

Smith, P.S.; Nations, J.A.; Short, R.D.

1991-08-01T23:59:59.000Z

15

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

16

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

17

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

18

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Broader source: Energy.gov (indexed) [DOE]

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

19

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

20

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers [EERE]

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers [EERE]

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

22

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Broader source: Energy.gov (indexed) [DOE]

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

23

Moab Project Continues Excellent Safety Record  

Broader source: Energy.gov [DOE]

MOAB, Utah – The Moab Uranium Mill Tailings Remedial Action Project has had a safe, productive year.

24

Holomorphic Structures on the Quantum Projective Line  

Science Journals Connector (OSTI)

......Projective Line Masoud Khalkhali 1 Giovanni Landi 2 3 Walter Daniel van Suijlekom 4 Correspondence to be sent to: waltervs@math...Modern Physics Letters A (2003) 18:2371-80. 13 Dubois-Violette M. , Masson T. On the first-order operators in bimodules......

Masoud Khalkhali; Giovanni Landi; Walter Daniël van Suijlekom

2011-01-01T23:59:59.000Z

25

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH  

E-Print Network [OSTI]

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH Subject: Project Schedule Project Duration: May 27 to August 10, 2014 The sewer line will be constructed in phases

Ickert-Bond, Steffi

26

4-H Animal Project Records In animal projects, record keeping is important for a number of reasons. The cost of a project  

E-Print Network [OSTI]

. The cost of a project is always important in planning for resources needed, and management changes4-H Animal Project Records In animal projects, record keeping is important for a number of reasons requirements of various events. Growth results relate to the success of some projects, while training time has

New Hampshire, University of

27

Student On Line Access to Records Provides on-line, self service access to  

E-Print Network [OSTI]

SOLAR Student On Line Access to Records #12;Provides on-line, self service access to: Registrar Enrollment Appointments · Review Solar Messages Student Account/ Financial Aid: · View Support offered (available aid ­ i.e. Federal loans, scholarships, etc.) · Accept financial aid (i.e. loans, etc.) ­ loan

28

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Broader source: Energy.gov (indexed) [DOE]

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

29

4-H Dog Project Senior Record Book  

E-Print Network [OSTI]

Leader; Terry Misch, State Dog Show Committee Chair and King George County 4-H/ANR Program Technician; Sue Coleman, State Dog Show Committee Chair and King George County Volunteer Leader; and Kenny county/city 4-H program are you enrolled in with this project __________________________________ 4-H Club

Liskiewicz, Maciej

30

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4,...

31

Proposed Project: Plains & Eastern Clean Line | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Proposed Project: Plains & Eastern Clean Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line's proposal was responsive to the RFP, and it is currently under consideration. The proposed Plains & Eastern Clean Line project (the proposed project) would include an overhead +/- 600 kV direct current electric transmission system and associated facilities with the capacity to deliver approximately

32

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Broader source: Energy.gov (indexed) [DOE]

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

33

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

34

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

United States. Bonneville Power Administration.

2006-11-01T23:59:59.000Z

35

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

36

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Broader source: Energy.gov (indexed) [DOE]

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

37

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Broader source: Energy.gov (indexed) [DOE]

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

38

Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

N /A

2004-10-21T23:59:59.000Z

39

Northern Pass Transmission Line Project Environmental Impact Statement:  

Broader source: Energy.gov (indexed) [DOE]

Northern Pass Transmission Line Project Environmental Impact Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 DOE has changed the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On September 6, 2013, the U.S. Department of Energy (DOE) published in the Federal Register an amended Notice of Intent (NOI) to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement

40

Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc.: Record of Decision for Issuing a Presidential Permit for the CHPE Transmission Line Project: Federal Register Notice, Volume 79, No. 190- Oct. 1, 2014  

Broader source: Energy.gov [DOE]

The Department of Energy (DOE) announces its decision to issue a Presidential permit to Champlain Hudson Power Express, Inc. (CHPEI), to construct, operate, maintain, and connect an electric transmission line across the U.S./Canada border in the northeastern New York State.

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

42

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

43

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. Additional information is available at the project...

44

A projective Simson line Geoff Smith, University of Bath  

E-Print Network [OSTI]

A projective Simson line Geoff Smith, University of Bath 15th October 2014 This is a preprint-profit making educational or research pur- poses. c G. C. Smith October 15 2014 Introduction Let ABC

Smith, Geoff

45

Proposed Project: Plains & Eastern Clean Line | Department of...  

Broader source: Energy.gov (indexed) [DOE]

published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In...

46

Nest Record Card Scheme 1 Welcome to the Nest Record Card Scheme, NERCS for short. The project aims to  

E-Print Network [OSTI]

Nest Record Card Scheme 1 Welcome to the Nest Record Card Scheme, NERCS for short. The project aims to monitor the breeding success of birds and increase our knowledge of their nesting habits. The Avian will be computerized to provide a backward perspective to the data from the new scheme. Why do we need nest records

de Villiers, Marienne

47

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

48

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

447: Champlain Hudson Power Express Transmission Line Project, 447: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line will run from the Canadian Province of Quebec to New York City. DOE also published a notice correcting the location of the public hearing that was held on November 19, 2013. Public Comment Opportunities As of December 6, 2013 - Comment Period Extended through 1/15/14 Written comments must be received by January 15, 2014. Comments submitted

49

EIS-0330: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision EIS-0330: Record of Decision Wallula-McNary Transmission Line Project and Wallula Power Project The Bonneville Power Administration (BPA) has decided to...

50

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

51

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

SciTech Connect (OSTI)

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Michael Lane

2012-01-01T23:59:59.000Z

52

UMTRA Project Administrative Files Collection Records Management Program  

SciTech Connect (OSTI)

The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program.

Not Available

1994-09-01T23:59:59.000Z

53

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

54

DOE Fuel Cell Technologies Office Record 13013: H2 Delivery Cost Projections – 2013  

Broader source: Energy.gov [DOE]

This program record from the U.S. Department of Energy's Fuel Cell Technologies Office provides information about past, current, and projected costs for delivering and dispensing hydrogen.

55

Multi-tower line focus Fresnel array project  

SciTech Connect (OSTI)

As an alternative to conventional tracking solar thermal trough systems, one may use line focus Fresnel reflector systems. In a conventional Fresnel reflector design, each field of reflectors is directed to a single tower. However efficient systems of very high ground utilisation can be setup if a field of reflectors uses multiple receivers on different towers. This paper describes a line focus system, called the compact linear fresnel reflector system and a project to produce an initial 95 MWth solar array. The array will be used as a retrofit preheater for a coal fired generating plant.

Mills, D.R.; Morrison, G.; Pye, J.; Le Lievre, P. [Solar Heat & Power SHP Pty. Ltd., Sydney, NSW (Australia)

2006-02-15T23:59:59.000Z

56

Plains & Eastern Clean Line Project Proposal for New or Upgraded  

Broader source: Energy.gov (indexed) [DOE]

Plains & Eastern Clean Line Project Proposal for New or Upgraded Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) Update to Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (August 2011) More Documents & Publications EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland Involvement Notice of Intent To Prepare an Environmental Impact Statement for the

57

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

58

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

59

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy Savers [EERE]

52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville...

60

A Fast, Robust Algorithm for Power Line Interference Cancellation in Neural Recording  

E-Print Network [OSTI]

Power line interference may severely corrupt neural recordings at 50/60 Hz and harmonic frequencies. In this paper, we present a robust and computationally efficient algorithm for removing power line interference from neural recordings. The algorithm includes four steps. First, an adaptive notch filter is used to estimate the fundamental frequency of the interference. Subsequently, based on the estimated frequency, harmonics are generated by using discrete-time oscillators, and then the amplitude and phase of each harmonic are estimated through using a modified recursive least squares algorithm. Finally, the estimated interference is subtracted from the recorded data. The algorithm does not require any reference signal, and can track the frequency, phase, and amplitude of each harmonic. When benchmarked with other popular approaches, our algorithm performs better in terms of noise immunity, convergence speed, and output signal-to-noise ratio (SNR). While minimally affecting the signal bands of interest, the a...

Keshtkaran, Mohammad Reza

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

and and Wallula - McNary Transmission Line Project Final Environmental Impact Statement DOE/EIS-0330 Lead Agencies Bonneville Power Administration Washington State Energy Facility Site Evaluation Council Cooperating Agencies Bureau of Land Management U.S. Fish and Wildlife Service August 2002 EFSEC Washington State Energy Facility Site Evaluation Council August 2002 Dear Reader: Enclosed for your reference is the abbreviated form Final Environmental Impact Statement (FEIS) for the proposed Wallula Power Project and Wallula-McNary Transmission Line Project. This document is designed to supplement or correct information provided in the Draft Environmental Impact Statement (DEIS). The proponent, Wallula Generation, LLC, has requested to build a 1,300-megawatt, gas-fired

62

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

63

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Broader source: Energy.gov (indexed) [DOE]

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

64

EIS-0332: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision EIS-0332: Record of Decision McNary-John Day Transmission Line Project Bonneville Power Administration has decided to implement the proposed action identified in...

65

EIS-0317: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

: Record of Decision EIS-0317: Record of Decision Kangley-Echo Lake Transmission Line Project Bonneville Power Administration has decided to implement the Proposed Action...

66

EIS-0325: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision EIS-0325: Record of Decision Schultz-Hanford Area Transmission Line Project Bonneville Power Administration has decided to implement the Agency Preferred...

67

Spent Nuclear Fuel Project document control and Records Management Program Description  

SciTech Connect (OSTI)

The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document.

MARTIN, B.M.

2000-05-18T23:59:59.000Z

68

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

69

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy Savers [EERE]

line between Eugene and Florence, Oregon. Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryLane-Wendson...

70

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

71

The Genome Database Organism-centered listing of available genomic sequence records and projects  

E-Print Network [OSTI]

The Genome Database Organism-centered listing of available genomic sequence records and projects http://www.ncbi.nlm.nih.gov/genome National Center for Biotechnology Information · National Library | NCBI Genome | Last Update August 19, 2013 Contact: info@ncbi.nlm.nih.gov Scope Since 2011, the Genome

Levin, Judith G.

72

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final EIS Appendix A: Revised Mitigation Measures Final EIS Appendix A: Revised Mitigation Measures August 2002 Page A-1 Appendix A Revised Mitigation Measures The proposed project includes measures that would limit construction and operation impacts to elements of the natural and human environment. These measures are presented for each element of the environment identified as a potential concern by Bonneville and EFSEC based on preliminary environmental review and public and regulatory agency input. Updates to the mitigation table below are in response to comments on the Draft EIS or to incorporate new information included in the Settlement Agreements. Mitigation Measure Power Plant Pipelines Bonneville T-Line EARTH Seismicity Facilities would be designed to meet regional seismic design criteria as presented in the Uniform Building Code (UBC). X X

73

DOE/EA-1485: Environmental Assessment for the Nisqually Transmission Line Relocation Project (January 2005)  

Broader source: Energy.gov (indexed) [DOE]

Nisqually Transmission Line Relocation Project Nisqually Transmission Line Relocation Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1485 Bonneville Power Administration January 2005 Nisqually Transmission Line Relocation Project Revision Sheet for Final Environmental Assessment 1 Revision Sheet for the Nisqually Transmission Line Relocation Project Final Environmental Assessment DOE/EA -1485 Summary This revision sheet documents the changes to be incorporated into the Nisqually Transmission Line Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On October 18, 2004, the Preliminary EA was sent to agencies and interested parties. Notification

74

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

75

EIS-0317: Kangley-Echo Lake Transmission Line Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

76

EIS-0101: Thermopolis, Alcova, Casper Transmission Line Project  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this statement to evaluate the environmental impacts of constructing, operating and maintaining a 230-kilovolt transmission line between Thermopolis, Wyoming, and Alcova, Wyoming, and a 230/345-kilovolt transmission line between Alcova, Wyoming, and Casper, Wyoming.

77

Estimation of Foetal Contribution to ECG Recordings Using Oblique Projection Technique Exploiting Cyclostationary Properties of the Heartbeat Signals  

E-Print Network [OSTI]

Estimation of Foetal Contribution to ECG Recordings Using Oblique Projection Technique Exploiting of cutaneous electrocardiogram (ECG) recordings using an oblique projection technique. To date, related in this paper is tailored to the problem of foetal ECG (FECG) con- tribution estimation. The optimal steering

78

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

79

EIS-0106: Great Falls-Conrad Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

80

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Broader source: Energy.gov (indexed) [DOE]

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Project Records Information System (PRIS) user`s manual. Revision 2  

SciTech Connect (OSTI)

The Project Records Information System (PRIS) is an interactive system developed for the Information Services Division (ISD) of Martin Marietta Energy Systems, Inc., to perform indexing, maintenance, and retrieval of information about Engineering project record documents for which they are responsible. This PRIS User`s Manual provides instruction on the use of this system. Section 2.0 of this manual presents an overview of PRIS, describing the system`s purpose; the data that it handles; functions it performs; hardware, software, and access; and help and error functions. Section 3.0 describes the interactive menu-driven operation of PRIS. Appendixes A, B, and C contain help screens, report descriptions, and the data dictionary, respectively.

Schwarz, R.K. [ed.; Cline, B.E.; Smith, P.S.

1993-10-01T23:59:59.000Z

82

Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

United States. Bonneville Power Administration

2006-10-25T23:59:59.000Z

83

EIS-0124: Conrad-Shelby Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

84

EIS-0499: Great Northern Transmission Line Project, Minnesota  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 750-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.

85

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

86

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

87

2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles  

E-Print Network [OSTI]

2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles Prof. Victor C become significant, especially in electric vehicles (EVs) of the future, which are highly sophisticated.M. Leung (vleung@ece.ubc.ca) 1. Project description In today's electric and conventional combustion engine

Leung, Victor C.M.

88

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

89

OFF-THE-RECORD COMMUNICATION FOR JORDAN COVE ENERGY PROJECT, L.P., FE DKT. NO. 12-32-LNG  

Broader source: Energy.gov [DOE]

Posting of Off-the-Record CommunicationThe documents linked below were sent to the Department of Energy (DOE) in reference to the Jordan Cove Energy Project, L.P., FE Dkt. No. 12-32-LNG proceeding....

90

DOE Hydrogen and Fuel Cells Program Record 9017: On-Board Hydrogen Storage Systems – Projected Performance and Cost Parameters  

Broader source: Energy.gov [DOE]

This program record from the Department of Energy's Hydrogen and Fuel Cells Program provides information about the projected performance and cost parameters of on-board hydrogen storage systems.

91

Pauli graph and finite projective lines/geometries  

E-Print Network [OSTI]

The commutation relations between the generalized Pauli operators of N-qudits (i. e., N p-level quantum systems), and the structure of their maximal sets of commuting bases, follow a nice graph theoretical/geometrical pattern. One may identify vertices/points with the operators so that edges/lines join commuting pairs of them to form the so-called Pauli graph P_{p^N} . As per two-qubits (p = 2, N = 2) all basic properties and partitionings of this graph are embodied in the geometry of the symplectic generalized quadrangle of order two, W(2). The structure of the two-qutrit (p = 3, N = 2) graph is more involved; here it turns out more convenient to deal with its dual in order to see all the parallels with the two-qubit case and its surmised relation with the geometry of generalized quadrangle Q(4, 3), the dual of W(3). Finally, the generalized adjacency graph for multiple (N > 3) qubits/qutrits is shown to follow from symplectic polar spaces of order two/three. The relevance of these mathematical concepts to mutually unbiased bases and to quantum entanglement is also highlighted in some detail.

Michel R. P. Planat; Metod Saniga

2007-03-16T23:59:59.000Z

92

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Broader source: Energy.gov (indexed) [DOE]

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

93

EIS-0447: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0447: Record of Decision Champlain Hudson Power Express Transmission Line Project, New York DOE announced its decision to grant a Presidential permit to Champlain Hudson...

94

EIS-0400: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0400: Record of Decision Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO Western Area Power Administration...

95

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

96

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

97

EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

98

Remote-Handled Low-Level Waste Disposal Project Code of Record  

SciTech Connect (OSTI)

The Remote-Handled Low-Level Waste (LLW) Disposal Project addresses an anticipated shortfall in remote-handled LLW disposal capability following cessation of operations at the existing facility, which will continue until it is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). Development of a new onsite disposal facility will provide necessary remote-handled LLW disposal capability and will ensure continuity of operations that generate remote-handled LLW. This report documents the Code of Record for design of a new LLW disposal capability. The report is owned by the Design Authority, who can authorize revisions and exceptions. This report will be retained for the lifetime of the facility.

S.L. Austad, P.E.; L.E. Guillen, P.E.; C. W. McKnight, P.E.; D. S. Ferguson, P.E.

2014-06-01T23:59:59.000Z

99

Remote-Handled Low-Level Waste Disposal Project Code of Record  

SciTech Connect (OSTI)

The Remote-Handled Low-Level Waste (LLW) Disposal Project addresses an anticipated shortfall in remote-handled LLW disposal capability following cessation of operations at the existing facility, which will continue until it is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). Development of a new onsite disposal facility will provide necessary remote-handled LLW disposal capability and will ensure continuity of operations that generate remote-handled LLW. This report documents the Code of Record for design of a new LLW disposal capability. The report is owned by the Design Authority, who can authorize revisions and exceptions. This report will be retained for the lifetime of the facility.

S.L. Austad, P.E.; L.E. Guillen, P.E.; C. W. McKnight, P.E.; D. S. Ferguson, P.E.

2012-04-01T23:59:59.000Z

100

Remote-Handled Low-Level Waste Disposal Project Code of Record  

SciTech Connect (OSTI)

The Remote-Handled Low-Level Waste (LLW) Disposal Project addresses an anticipated shortfall in remote-handled LLW disposal capability following cessation of operations at the existing facility, which will continue until it is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). Development of a new onsite disposal facility will provide necessary remote-handled LLW disposal capability and will ensure continuity of operations that generate remote-handled LLW. This report documents the Code of Record for design of a new LLW disposal capability. The report is owned by the Design Authority, who can authorize revisions and exceptions. This report will be retained for the lifetime of the facility.

S.L. Austad, P.E.; L.E. Guillen, P.E.; C. W. McKnight, P.E.; D. S. Ferguson, P.E.

2012-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

102

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

103

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register  

Broader source: Energy.gov [DOE]

The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

104

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

105

EIS-0344: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision EIS-0344: Record of Decision Grand Coulee-Bell 500-kV Transmission Line Project The Bonneville Power Administration (BPA) has decided to construct the proposed...

106

DOE Hydrogen and Fuel Cells Program Record 9017: On-Board Hydrogen Storage Systems Â… Projected Performance and Cost Parameters  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Hydrogen and Fuel Cells Program Record DOE Hydrogen and Fuel Cells Program Record Record #: 9017 Date: July 02, 2010 Title: On-Board Hydrogen Storage Systems - Projected Performance and Cost Parameters Originators: Robert C. Bowman and Ned Stetson Approved by: Sunita Satyapal Date: August 10, 2010 This record summarizes the current technical assessments of hydrogen (H 2 ) storage system capacities and projected manufacturing costs for the scenario of high-volume production (i.e., 500,000 units/year) for various types of "on-board" vehicular storage systems. These analyses were performed within the Hydrogen Storage sub-program of the DOE Fuel Cell Technologies (FCT) program of the Office of Energy Efficiency and Renewable Energy. Item: It is important to note that all system capacities are "net useable capacities" able to be delivered to the

107

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

108

Portsmouth Herald Local News: Project54 innovations enhance public safety Archives Business Entertainment Health Living Maine News Online Only Public Records Sports Tourism Travel  

E-Print Network [OSTI]

Entertainment Health Living Maine News Online Only Public Records Sports Tourism Travel Click Here Shop Records Sports Tourism Travel emergency vehicles equipped with Project54, including a fire truck from

New Hampshire, University of

109

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Broader source: Energy.gov [DOE]

The USDA Rural Utilities Service, with DOE’s Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1).)

110

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley  

E-Print Network [OSTI]

?unintentional?vandalism,?and?normal?irrigation?district?operational?and?maintenance? activities.??Each?project?was?evaluated?using?a?visual?inspection?process?during?which? performance/condition?ratings?were?assigned.? ? Without?question,?the?best?lining?system?is?a?synthetic?liner?with?a?protective?barrier?of? shotcrete.??The?synthetic?liner?significantly?reduces?seepage,?while?the?shotcrete?protects...?it? from?damage.??This?lining?system?needs?little?to?no?maintenance.??There?were?two?types?of? liners?used:?PVC?and?polyester.??Each?performed?equally?as?well.? ? The?performance?of?synthetic?liners?without?a?protective...

Karimov, Askar; Leigh, Eric; Fipps, Guy

111

Western Area Power Administration Flatiron-Erie 115-kilovolt Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

65 65 Federal Register / Vol. 60, No. 161 / Monday, August 21, 1995 / Notices biomedical technology, and computational biology. One of the components of these programs deals with correctly assessing the dose to various systems that are exposed to radiation fields during treatment. These systems could range from biomolecules to different tissues and organs. The exposure to both patients and health care providers results from such sources as neutrons, high LET radiation, and low LET radiation such as electrons, x- rays, and gamma rays. In many situations, radiation could be combinations of the various radiation fields listed above. For example, development of improved methods for determination of dose to normal vs. cancerous tissue, and of strategies for maximizing the dose to cancerous tissue

112

Record of Decision for the Electrical Interconnection of Goldendale Energy Project (DOE/EIS-0183) (03/20/01)  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision for the Electrical Record of Decision for the Electrical Interconnection of Goldendale Energy Project SUMMARY Bonneville Power Administration (BPA) has decided to offer terms for integrating power from the Goldendale Energy Project (GEP) into the Federal Columbia River Transmission System (FCRTS). BPA will offer contracts integrating power from GEP into the FCRTS for delivery to the wholesale power market. In reaching this decision, I have considered the potential environmental impacts addressed in BPA's Business Plan Environmental Impact Statement (BP EIS, DOE/EIS-0183) and a Supplement Analysis (DOE/EIS-0183/SA-03). I have also considered input from the public process for the GEP. BPA will distribute this Record of Decision (ROD) to all known interested and affected persons, Tribes, and agencies and will publish a notice of its availability in the

113

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

114

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENT, FISH AND WILDLIFE August 30, 2002 In reply refer to: T To: People Interested in the McNary-John Day Transmission Line Project Bonneville Power Administration (Bonneville) has finalized the enclosed Environmental Impact Statement (EIS) for the McNary-John Day Transmission Line Project. In March, we sent you the draft EIS, asked for your comments and had three public meetings. The response was great; we received about 350 comments on the draft document. Thank you for taking the time to read the document and tell us your ideas. This letter briefly describes the final EIS, outlines our next steps and tells where to call if you have questions. The final EIS is abbreviated, consisting of an introduction to the document, changes to the draft

115

The Use and Benefits of Video Inspection in Lined and Unlined Ductwork in IAQ Surveys and "Source Removal" Cleaning Projects  

E-Print Network [OSTI]

New technology has developed video equipment capable of inspecting interior lined and unlined ductwork. Where IAQ (Indoor Air Quality) questions require inspections of suspicious air conveyance systems. Video recordings provide useful information...

Kiec, T. M.

116

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

117

Project Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects Spacer Damper Replacement Program Wind Projects Project Overview BPA...

118

2003 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Line Project and Wallula Power Project - March 10th, 2003 Grand Coulee-Bell 500-kV Transmission Line Project - January 10, 2003 Wallula-McNary Transmission Line Project and...

119

Liberty-Parker No. 2 230-kV transmission line project, La Paz and Maricopa Counties, Arizona: Environmental assessment  

SciTech Connect (OSTI)

The proposed project was not found to have the potential for significant impact on the human environment. The proposed project is essentially a rebuild of an existing transmission line on an existing right-of-way (ROW) through mostly unpopulated open desert. Analysis of the proposed action and its potential effects on various environmental components showed that the project would not significantly affect climate, air quality, noise levels, topography, geology, or soils. No significant impact would occur to vegetation or wildlife as a result of the project. Visual resources will not be significantly affected, as both the existing Liberty-Parker No. 2 Transmission Line and its parallel sister No. 1 line are already present. Land ownership, land use, and socioeconomics will not be significantly affected. No significant cultural resources will be affected by the proposed project. The lines will be constructed on areas previously surveyed for cultural resources and the site density of this region is known to be very low.

Not Available

1986-09-01T23:59:59.000Z

120

Microsoft Word - NEPA_CX_FINAL_Lancaster_Line_and_Load_Project_06-15-2012.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Project Manager - TEP-TPP-1 Proposed Action: Lancaster Line and Load Project - LO311 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities B4.7 Fiber optic cable Location: Lancaster Substation, Kootenai County, Idaho; approximately 2.2 miles southwest of Rathdrum, Idaho, (Township 51 North, Range 5 West, Section 11). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to add equipment to its existing Lancaster Substation, replace one transmission structure, modify one existing structure, and replace existing

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley of Texas: 2011 Ratings and Analysis  

E-Print Network [OSTI]

changes using a lining evaluation form which we developed. For analysis purposes, we grouped all the projects into two general categories: liners with a protective barrier, and liners without a protective barrier. The projects with a protective... barrier performed very well. The synthetic liner significantly reduces seepage, while the shotcrete layer protects the liner from damage. This lining system needs little to no maintenance. There were two types of liners used: PVC and polyester. Each...

Bonaiti, Gabriele; Karimov, Askar; Fipps, Guy

122

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

123

Record of Decision - Klondike III/ Biglow Canyon Wind Integration Project - 10-25-06  

Broader source: Energy.gov (indexed) [DOE]

Klondike III/Biglow Canyon Wind Integration Project Klondike III/Biglow Canyon Wind Integration Project DECISION The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE) 1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects,

124

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. BH-DS-171  

Broader source: Energy.gov (indexed) [DOE]

DS-171 DS-171 Title: Use RW Surge Line to BH Anhydrite Pond for RWIS Recycle Description: DOE M&O Contractor will cap the existing recycle line at the BH raw water intake structure for repair work and install a valve in place of the existing surge relief valve to serve as a recycle valve to control flow from the BH raw water intake pumps. The raw water surge line will discharge to the BH anhydrite pond while repairs are being made to the recycle line. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart 0 are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment

125

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

126

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

127

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

128

Record of Decision Issued for the FutureGen 2.0 Project | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy (DOE) has decided to provide financial assistance to the FutureGen Industrial Alliance (the Alliance) for the FutureGen 2.0 Project. DOE will provide approximately 1...

129

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

130

DOE Hydrogen and Fuel Cells Program Record 13013: Hydrogen Delivery Cost Projections - 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3013 Date: September 26, 2013 3013 Date: September 26, 2013 Title: H 2 Delivery Cost Projections - 2013 Originator: E. Sutherland, A. Elgowainy and S. Dillich Approved by: R. Farmer and S. Satyapal Date: December 18, 2013 Item: Reported herein are past 2005 and 2011 estimates, current 2013 estimates, 2020 projected cost estimates and the 2015 and 2020 target costs for delivering and dispensing (untaxed) H 2 to 10%- 15% of vehicles within a city population of 1.2M from a centralized H 2 production plant located 100 km from the city gate. The 2011 volume cost estimates are based on the H2A Hydrogen Delivery Scenario Analysis Model (HDSAM) V2.3 projections and are employed as the basis for defining the cost and technical targets of delivery components in Table 3.2.4 in the 2012 Delivery

131

Record of Decision for the Advanced Mixed Waste Treatment Project at INEEL  

Broader source: Energy.gov (indexed) [DOE]

948 948 Federal Register / Vol. 64, No. 66 / Wednesday, April 7, 1999 / Notices A0608 TAPC SYSTEM NAME: Personal Affairs Files. SYSTEM LOCATION: Decentralized to major commands, installations, and activities. Official mailing addresses are published as an appendix to the Army's compilation of record systems notices. CATEGORIES OF INDIVIDUALS COVERED BY THE SYSTEM: Army officers, warrant officers, and enlisted personnel on active duty. CATEGORIES OF RECORDS IN THE SYSTEM: Third party inquiries pertaining to such matters as dependent assistance, indebtedness, non-support, paternity claims, and marriage in overseas areas. AUTHORITY FOR MAINTENANCE OF THE SYSTEM: 10 U.S.C. 3013, Secretary of the Army and 5 U.S.C. 301, Departmental Regulations. PURPOSE(S): To review and answer inquiries concerning personal affairs of service

132

The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata  

SciTech Connect (OSTI)

The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

2009-09-01T23:59:59.000Z

133

The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata  

SciTech Connect (OSTI)

The Genomes On Line Database (GOLD) is a comprehensive resource of information for genome and metagenome projects world-wide. GOLD provides access to complete and ongoing projects and their associated metadata through pre-computed lists and a search page. The database currently incorporates information for more than 2900 sequencing projects, of which 639 have been completed and the data deposited in the public databases. GOLD is constantly expanding to provide metadata information related to the project and the organism and is compliant with the Minimum Information about a Genome Sequence (MIGS) specifications.

Fenner, Marsha W; Liolios, Konstantinos; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Kyrpides, Nikos C.

2007-12-31T23:59:59.000Z

134

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

135

Coyote Springs Cogeneration Project - Final Environmental Impact Statement and Record of Decision (DOE/EIS-0201)  

Broader source: Energy.gov (indexed) [DOE]

Coyote Springs Cogeneration Project - Final Environmental Impact Statement Coyote Springs Cogeneration Project - Final Environmental Impact Statement Summary-1 Summary Bonneville Power Administration (BPA) is a Federal power marketing agency in the U.S. Department of Energy. BPA is considering whether to transmit (wheel) electrical power from a proposed privately-owned, gas-fired combustion turbine power generation plant in Morrow County, Oregon. The proposed power plant would have two combustion turbines that would generate 440 average megawatts (aMW) of energy when completed. The proposed plant would be built in phases. The first combustion turbine would be built as quickly as possible. Timing for the second combustion turbine is uncertain. As a Federal agency subject to the Nation Environ- mental Policy Act, BPA must complete a review of environmental impacts before it makes a

136

Post-Cleanup Communication and Records Plan for Project Chariot, Alaska  

SciTech Connect (OSTI)

The Project Chariot Site resides in a remote and isolated area in the Cape Thompson region of northwest Alaska (Figure 1-1). The Project Chariot Site was a proposed test location for the U.S. Atomic Energy Commission (AEC) Plowshare Program in 1958. In 1962, the United States Geological Survey (USGS) conducted environmental studies using less than 30 mCi of short-lived mixed fission products. The location of the studies was about 0.75 mile (1.2 km) north of the Project Chariot Site base camp. Radioactive material was spread over the 12 test plots: 10 were used for overland transport tracer tests, one for a sediment transport experiment, and one for an 18-hour percolation test. The 11 test plots constituted an area less than 0.9 percent of an acre. At the conclusion of the August 1962 tracer test, USGS scraped the ground surface of the test plots and the percolation test location. The scraped soil and vegetation were mixed with native soil, deposited in a mound on two of the plots, and covered with 4 ft (1.22 m) of uncontaminated soil (DOE 1993).

None

2005-01-01T23:59:59.000Z

137

Record of Decision for the Medical Isotopes Production Project: Molybdenum-99 and Related Isotopes  

Broader source: Energy.gov (indexed) [DOE]

21 21 Federal Register / Vol. 61, No. 181 / Tuesday, September 17, 1996 / Notices property at Fort Ord, California. The FSEIS also analyzes impacts on a range of potential reuse alternatives. Copies of the FSEIS have been forwarded to various federal, state and local agencies, and predetermined interested organizations and individuals. DATES: This FSEIS will be available to the public for 30 days, after which the Army will prepare a Record of Decision for the Army action. ADDRESSES: Copies of the Final Supplemental Environmental Impact Statement can be obtained by writing or calling Mr. Bob Verkade, Sacramento District, U.S. Army Corps of Engineers, 1325 J Street, Sacramento, California 95814-2922, telephone (916) 557-7423, fax (916) 557-5307. Raymond J. Fatz, Deputy Assistant Secretary of the Army

138

Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project (DOE/EIS-0183) (10/21/04)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project INTRODUCTION The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new

139

EIS-0399: Record of Decision (WAPA) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

WAPA) EIS-0399: Record of Decision (WAPA) Montana Alberta Tie Ltd. 230-kV Transmission Line Project The Western Area Power Administration has decided to finance a portion of the...

140

EIS-0399: Record of Decision (OE) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

OE) EIS-0399: Record of Decision (OE) Montana Alberta Tie Ltd. 230-kV Transmission Line Project Department of Energy announces its decision to issue a Presidential permit to...

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Record of Decision for the Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements (DOE/EIS-0266) (11/20/00)  

Broader source: Energy.gov (indexed) [DOE]

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements Administrator's Record of Decision Summary The Bonneville Power Administration (BPA) has decided to execute Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project). Initially, BPA will execute one or more PPAs in order to acquire up to the entire Project output. TSAs will be executed before the Project becomes operational. The United States Forest Service (Forest Service) and the Bureau of Land Management (BLM) were the joint lead Federal agencies in the preparation of

142

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. WH-MM-668  

Broader source: Energy.gov (indexed) [DOE]

668 668 Title: WH Pigging Water Disposal Description: Subcontractor shall provide all labor, tools, materials (except GFE), equipment and supervision to perform the work associated with the WH Pigging Water Disposal project. Tasks include construction of concrete foundations for pipe supports; installation, testing, and coating of piping; and associated electrical and instrumentation. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following:

143

EIS-0294: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Record of Decision 4: Record of Decision EIS-0294: Record of Decision Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line (June 1999) Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line. The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power

144

OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

145

Notice of Availability of a Record of Decision for the Mint Farm Generation Project (2/27/02)  

Broader source: Energy.gov (indexed) [DOE]

48 48 Federal Register / Vol. 67, No. 39 / Wednesday, February 27, 2002 / Notices 5. Duration and Effective Date 5.1 All actions pursuant to any authority delegated prior to this Order or pursuant to any authority delegated by this Order taken prior to and in effect on the date of this Order are ratified, and remain in force as if taken under this Order, unless or until rescinded, amended or superseded. 5.2 This Order is effective December 6, 2001. Spencer Abraham, Secretary of Energy. [FR Doc. 02-4564 Filed 2-26-02; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Bonneville Power Administration Mint Farm Generation Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the

146

2000 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History Book Records of Decision Tribal Affairs 2000 Records of Decision Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements -...

147

DOE/EA-1635: Environmental Assessment for Pre-approval Review Williston to Tioga Transmission Line Project (March 2010)  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 March 2010 Acronyms and Abbreviations °C degrees Celsius AAQS Ambient Air Quality Standards AIRFA American Indian Religious Freedom Act of 1978 amsl above mean sea level APLIC Avian Power Line Interaction Committee BEPC Basin Electric Power Cooperative BFE Base Flood Elevation BGEPA Bald and Golden Eagle Protection Act BMP best management practice CFR Code of Federal Regulations CO 2 carbon dioxide Council Advisory Council on Historic Preservation CRP Conservation Reserve Program

148

Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado. Draft environmental impact statement  

SciTech Connect (OSTI)

Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed.

Not Available

1993-05-01T23:59:59.000Z

149

Correcting Privacy Act Records  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Correcting-Privacy-Act-Records Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

150

2002 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2-Records-of-Decision Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

151

1996 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6-Records-of-Decision Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

152

2005 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5-Records-of-Decision Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

153

2012 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2-Records-of-Decision Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

154

2010 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-Records-of-Decision Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

155

2013 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3-Records-of-Decision Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

156

1999 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9-Records-of-Decision Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

157

2011 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1-Records-of-Decision Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives Finance...

158

Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project (DOE/EIS-0183) (11/29/06)  

Broader source: Energy.gov (indexed) [DOE]

Windy Point Wind Energy Project Windy Point Wind Energy Project November 2006 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. 1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line.

159

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

160

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Broader source: Energy.gov (indexed) [DOE]

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Record of Decision for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project (DOE/EIS-0183)(10/19/01)  

Broader source: Energy.gov (indexed) [DOE]

for the for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project, a 248-megawatt (MW) gas-fired, combined-cycle combustion turbine (CCCT) power generation project (Project), into the Federal Columbia River Transmission System (FCRTS). The Project is located within an industrial area adjacent to TransAlta's existing Centralia Steam Plant in Lewis County, Washington. The West Coast is experiencing a shortfall in electric energy supply, as well as a volatile wholesale power market in which prices have reached record highs. The Project is one of

162

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

163

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

164

Record of Decision (ROD) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 18, 2011 August 18, 2011 EIS-0240: Amended Record of Decision Disposition of Surplus Highly Enriched Uranium July 20, 2011 EIS-0387: Record of Decision Y-12 National Security Complex July 8, 2011 EIS-0380: Amended Record of Decision Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico April 18, 2011 EIS-0416: Record of Decision Issuance of Loan Guarantees to Solar Partners I, LLC, Solar Partners II, LLC, and Solar Partners VIII, LLC, for Ivanpah Solar Electric Generating System Units 1, 2, 3 March 11, 2011 EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project January 12, 2011 EIS-0407: Record of Decision Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas November 29, 2010

165

Directions: Members should also enroll in the Horse Management project and keep an accurate and up-to-date management record.  

E-Print Network [OSTI]

-to-date management record. Participation in the riding series is strictly on an elective basis. The riding projects _____________________________________________ VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY VIRGINIA STATE UNIVERSITY Virginia Cooperative employer. Issued in furtherance of Cooperative Extension work, Virginia Polytechnic Institute and State

Liskiewicz, Maciej

166

MATLAB Project #1: Getting Started with MATLAB Record and hand in the printed the MATLAB commands and the results. Also, answer  

E-Print Network [OSTI]

1 MATLAB Project #1: Getting Started with MATLAB Note: Record and hand in the printed the MATLAB of MATLAB and the various MATLAB commands. This can be used as a brief tutorial and as a reference for basic operations. Use MATLAB's help, helpwin, and demo commands or see a User's Guide for more information. Part 1

Yang, Shih-Hsuan

167

Simulated Fatigue Damage Index on Mooring Lines of a Gulf of Mexico Truss Spar Determined from Recorded Field Data  

E-Print Network [OSTI]

, for their guidance and support throughout the course of this research. I would also like to thank Dr. Paul Jacob, Americas representative of Orcina Ltd., for his continual support in OrcaFlex and consultation on the study. Thanks also to my friends... ....................................................................................................... 9 2.3 Chain Jack Tensions .................................................................................... 12 2.4 Metocean Criteria and Recorded Data ......................................................... 17 2.5 OrcaFlex...

Kiecke, Adam Fuller

2012-07-16T23:59:59.000Z

168

EIS-0332: McNary-John Day Transmission Line Project, OR  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

169

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

170

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

SciTech Connect (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

171

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

172

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

173

DOE/EIS-0183 Record of Decision for the Electrical Interconnection of the Kittitas Valley Wind Project (09/04/09)  

Broader source: Energy.gov (indexed) [DOE]

Kittitas Valley Wind Project Kittitas Valley Wind Project September 2009 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 108 megawatts (MW) of power to be generated by the proposed Kittitas Valley Wind Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Sagebrush Power Partners, LLC (Sagebrush) has received authorization from the Washington Energy Facility Site Evaluation Council (EFSEC) to construct and operate the proposed Wind Project in Kittitas County, Washington, and has requested interconnection to the FCRTS on BPA's Columbia-Covington 230-kV transmission line in the vicinity of Ellensburg, Washington. BPA will construct a new substation to accommodate this additional power into the

174

EIS-0422: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision Record of Decision EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project The Bonneville Power Administration (BPA) has decided to construct the proposed Central Ferry-Lower Monumental 500-kilovolt (kV) Transmission Line Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the Combination A Alternative identified in the Central Ferry-Lower Monumental 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0422, February 2011). The Combination A Alternative consists of constructing a new 500-kV transmission line from BPA's new Central Ferry Substation near the Port of Central Ferry in Garfield County generally west through Garfield,

175

Points, lines and diamonds: a two-sorted modal logic for projective planes  

Science Journals Connector (OSTI)

......P1) each pair of distinct points is connected by exactly one...lines intersects in exactly one point, (P3) there are at least four points such that no three of them are...obviously, here one could lift the restriction that and ' be......

Y Venema

1999-10-01T23:59:59.000Z

176

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

177

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana  

Broader source: Energy.gov [DOE]

DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana.

178

EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

179

DOE/EA-1508: Environmental Assessment for the Beaver Creek-Hoyt-Erie Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

BC-HT-EE Mitigation Action Plan Nov. 2005 1 BC-HT-EE Mitigation Action Plan Nov. 2005 1 Mitigation Action Plan To Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 BC-HT-EE Mitigation Action Plan Nov. 2005 2 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Construction Contractor Western Maintenance The contractor shall limit the movement of crews and equipment to the ROW, including access routes. The contractor shall limit movement on the ROW to minimize damage to residential yards, grazing land, crops, orchards, and property, and shall avoid marring the lands.

180

Notice of Availability of the Record of Decision for the Goodnoe Hills and White Creek Wind Energy Projects, Business Plan EIS (DOE/EIS-0183) (October 2005)  

Broader source: Energy.gov (indexed) [DOE]

13 Federal Register 13 Federal Register / Vol. 70, No. 226 / Friday, November 25, 2005 / Notices DEPARTMENT OF ENERGY Bonneville Power Administration Goodnoe Hills and White Creek Wind Energy Projects, October 2005 AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: BPA has decided to offer contract terms for interconnection of the Goodnoe Hills and White Creek Wind Energy Projects into the Federal Columbia River Transmission System (FCRTS) at the Rock Creek substation in Klickitat County, Washington. The Large Generation Interconnection Agreement (LGIA) provides for interconnection of the Wind Projects with the FCRTS, the operation of Goodnoe Hills and White Creek Wind Energy Projects in the BPA Control Area

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Whistling Ridge Energy Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Whistling Ridge Energy Project Bonneville Power...

182

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

Not Available

1993-12-01T23:59:59.000Z

183

Record of Decision and Floodplain Statement of Findings: Western Greenbrier Co-Production Demonstration Project, Rainelle, Greenbrier County, WV (DOE/EIS-0361) (04/29/08)  

Broader source: Energy.gov (indexed) [DOE]

14 Federal Register 14 Federal Register / Vol. 73, No. 83 / Tuesday, April 29, 2008 / Notices DEPARTMENT OF ENERGY Record of Decision and Floodplain Statement of Findings: Western Greenbrier Co-Production Demonstration Project, Rainelle, Greenbrier County, WV AGENCY: Office of Fossil Energy, U.S. Department of Energy (DOE). ACTION: Record of Decision (ROD) and Floodplain Statement of Findings. SUMMARY: DOE has decided to implement the Proposed Action alternative, identified as the preferred alternative, in the Western Greenbrier Co-Production Demonstration Project, Final Environmental Impact Statement (DOE/EIS-0361; November 2007) (FEIS). That alternative is to provide approximately $107.5 million (up to 50% of the development costs) to Western Greenbrier Co-Generation, LLC

184

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

upgrading to a upgrading to a double circuit of 3.6 miles of the existing Casa Grande-Empire 11S-kV transmission line located in Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to work with Salt River Project on an upgrade to a double circuit on its Casa Grande-Empire 11S-kV transmission line. This project involves the removal of the existing H-frame wooden structures and the installation of new steel monopole structures. This will require auger trucks, bulldozers, bucket trucks and cranes. Existing access roads and the existing right-of-way will be used for vehicles such as pickup trucks, crew trucks, backhoes and bucket trucks to bring personnel and equipment to the work areas. The attached map shows the project area situated within Sections 19, 30 & 31 of

185

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

186

ADMINISTRATIVE RECORDS  

Broader source: Energy.gov (indexed) [DOE]

3: 3: PROCUREMENT, SUPPLY, AND GRANT RECORDS July 2008 Revision 2 Procurement and supply records document the acquisition of goods and non-personal services, controlling the volume of stock on hand, reporting procurement needs, and related supply matters which are part of daily procurement operations. The basic procurement files reflect a considerable range of procedure, from simple, small purchases to complicated prime contractor and subcontractor operations. Any records created prior to 1895 must first be offered to the National Archives and Records Administration (NARA) for appraisal before applying the disposal instructions. Frequently copies of procurement papers become integral parts of other files, such as project files of various types or general subject files pertaining to program operations;

187

Notice of Availability of the Record of Decision for the Arlington Wind Interconnection Project (DOE/EIS-0183) (1/14/05)  

Broader source: Energy.gov (indexed) [DOE]

86 86 Federal Register / Vol. 70, No. 16 / Wednesday, January 26, 2005 / Notices 8. Mr. Mohan Singh, Regional Business Director, North Atlantic Division. Brenda S. Bowen, Army Federal Register Liaison Office. [FR Doc. 05-1383 Filed 1-25-05; 8:45 am] BILLING CODE 3710-08-M DEPARTMENT OF ENERGY Bonneville Power Administration Arlington Wind Interconnection Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record of Decision (ROD). SUMMARY: This notice announces the availability of the ROD to offer contract terms to interconnect up to 200 megawatts of wind generation from the Columbia Energy Partners' proposed Arlington Wind Project into the Federal Columbia River Transmission System. The wind project will be interconnected

188

Binaries discovered by the SPY project. IV. Five single-lined DA double white dwarfs  

E-Print Network [OSTI]

We present results from our ongoing follow-up observations of double white dwarf binaries detected in the ESO SN Ia Progenitor SurveY (SPY). We discuss our observing strategy and data analysis and present the orbital solutions of five close double white dwarf binaries: HE0320-1917, HE1511-0448, WD0326-273, WD1013-010 and WD1210+140. Their periods range from 0.44 to 3.22 days. In none of these systems we find any spectral lines originating from the companion. This rules out main sequence companions and indicates that the companion white dwarfs are significantly older and cooler than the bright component. Infrared photometry suggests the presence of a cool, helium-rich white dwarf companion in the binary WD0326-273. We briefly discuss the consequences of our findings for our understanding of the formation and evolution of double white dwarfs.

G. Nelemans; R. Napiwotzki; C. Karl; T. R. Marsh; B. Voss; G. Roelofs; R. G. Izzard; M. Montgomery; T. Reerink; N. Christlieb; D. Reimers

2005-06-10T23:59:59.000Z

189

Record of Decision (ROD) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 19, 2008 December 19, 2008 EIS-0236: Record of Decision Complex Transformation --Tritium Research and Development, Flight Test Operations, and Major Environmental Test Facilities December 19, 2008 EIS-0236: Record of Decision Complex Transformation-Operations Involving Plutonium, Uranium, and the Assembly and Disassembly of Nuclear Weapons December 10, 2008 EIS-0283: Amended Record of Decision Surplus Plutonium Disposition: Waste Solidification Building November 17, 2008 EIS-0399: Record of Decision Montana Alberta Tie Ltd. 230-kV Transmission Line Project November 6, 2008 EIS-0312: Record of Decision 2008 Columbia Basin Fish Accords Memorandum of Agreement with the Shoshone-Banock Tribes October 10, 2008 EIS-0369: Record of Decision and Floodplain Statement of Findings

190

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California  

Broader source: Energy.gov (indexed) [DOE]

2 2 Federal Register / Vol. 63, No. 30 / Friday, February 13, 1998 / Notices taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of his filing are on file with the Commission and are available for public inspection in the Public Reference Room. David P. Boergers, Acting Secretary. [FR Doc. 98-3659 Filed 2-12-98; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California AGENCY: Western Area Power Administration, DOE. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: In accordance with Section

191

DOE/EIS-0325; Environmental Impact Statement for Schultz-Hanford Area Transmission Line Project (02/2002)  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement Summary Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Summary S-1 Summary In this Summary: * The Purposes and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the Draft Environmental

192

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Broader source: Energy.gov (indexed) [DOE]

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

193

EIS-0414: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

414: Record of Decision 414: Record of Decision EIS-0414: Record of Decision Energia Sierra Juarez Transmission Project DOE announces its decision to issue a Presidential permit to Energia Sierra Juarez U.S. Transmission, LLC (ESJ), to construct, operate, maintain, and connect a double-circuit, 230,000-volt (230-kV) electric transmission line across the U.S.-Mexico border in eastern San Diego County, California. The potential environmental impacts associated with the transmission line are analyzed in the Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project (DOE/EIS-0414). The transmission line would originate at San Diego Gas and Electric's planned East County Substation (ECO Substation), and extend southward approximately 0.65 miles to the U.S. border with Mexico, near Jacumba,

194

The hybrid reactor project based on the straight field line mirror concept  

SciTech Connect (OSTI)

The straight field line mirror (SFLM) concept is aiming towards a steady-state compact fusion neutron source. Besides the possibility for steady state operation for a year or more, the geometry is chosen to avoid high loads on materials and plasma facing components. A comparatively small fusion hybrid device with 'semi-poor' plasma confinement (with a low fusion Q factor) may be developed for industrial transmutation and energy production from spent nuclear fuel. This opportunity arises from a large fission to fusion energy multiplication ratio, Q{sub r} = P{sub fis}/P{sub fus}>>1. The upper bound on Q{sub r} is primarily determined by geometry and reactor safety. For the SFLM, the upper bound is Q{sub r} Almost-Equal-To 150, corresponding to a neutron multiplicity of k{sub eff}=0.97. Power production in a mirror hybrid is predicted for a substantially lower electron temperature than the requirement T{sub e} Almost-Equal-To 10 keV for a fusion reactor. Power production in the SFLM seems possible with Q Almost-Equal-To 0.15, which is 10 times lower than typically anticipated for hybrids (and 100 times smaller than required for a fusion reactor). This relaxes plasma confinement demands, and broadens the range for use of plasmas with supra-thermal ions in hybrid reactors. The SFLM concept is based on a mirror machine stabilized by qudrupolar magnetic fields and large expander tanks beyond the confinement region. The purpose of the expander tanks is to distribute axial plasma loss flow over a sufficiently large area so that the receiving plates can withstand the heat. Plasma stability is not relying on a plasma flow into the expander regions. With a suppressed plasma flow into the expander tanks, a possibility arise for higher electron temperature. A brief presentation will be given on basic theory for the SFLM with plasma stability and electron temperature issues, RF heating computations with sloshing ion formation, neutron transport computations with reactor safety margins and material load estimates, magnetic coil designs as well as a discussion on the implications of the geometry for possible diagnostics. Reactor safety issues are addressed and a vertical orientation of the device could assist passive coolant circulation. Specific attention is put to a device with a 25 m long confinement region and 40 cm plasma radius in the mid-plane. In an optimal case (k{sub eff}= 0.97) with a fusion power of only 10 MW, such a device may be capable of producing a power of 1.5 GW{sub th}.

Agren, O.; Noack, K.; Moiseenko, V. E.; Hagnestal, A.; Kaellne, J.; Anglart, H. [Uppsala University, Angstroem Laboratory, Uppsala University, Box 534, SE-751 21 Uppsala (Sweden); Institute of Plasma Physics, National Science Center 'Kharkiv Institute of Physics and Technology', 61108 Kharkiv (Ukraine); Uppsala University, Angstroem Laboratory, Uppsala University, Box 534, SE-751 21 Uppsala (Sweden); Royal Institute of Technology, Nuclear Reactor Technology, SE 100 44 Stockholm (Sweden)

2012-06-19T23:59:59.000Z

195

DOE/EIS-0397: Record of Decision for the Lyle Falls Fish Passage Project Final Environmental Impact Statement (2/20/09)  

Broader source: Energy.gov (indexed) [DOE]

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION NATIONAL ENVIRONMENTAL POLICY ACT RECORD OF DECISION Lyle Falls Fish Passage Project SUMMARY The Bonneville Power Administration (BPA) has decided to fund modifications to the existing Lyle Falls Fishway on the lower Klickitat River in Klickitat County, Washington. In addition to improving fish passage to the upper part of the Klickitat River watershed, the modifications will facilitate collection and monitoring of biological information for future fishery management and enhance opportunities for adult salmonids to access and utilize habitat in the upper Klickitat River. This decision implements the Proposed Action and Preferred Alternative identified in the Lyle Falls Fish Passage Project (Lyle Falls) EIS (DOE/EIS-0397, November 2008). BPA was

196

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

near 10 structure locations along the existing Casa Grande-Empire 115-kV transmission line located in Pinal County, Arizona. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to do geologic borings within our right-of-way near structures 18/5, 19/6, 21/2, 2317, 26/4, 28/4, 36/1, 37/5, 39/4 and 41/4 along the existing Casa Grande-ED #5115-kV transmission line. This project involves accessing each bore hole location with a augerldrill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas. The attached maps show the project areas situated within Sections 7,20 & 32

197

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

near 9 near 9 structure locations along the existing ED2-ED5 230-kV transmission line located in Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A, Proposed Action: Western proposes to do geologic borings within our right-of-way near structures 21/5,22/5,23/6,25/4,26/5,27/6,28/5,29/5 & 30/4 along the existing ED2-ED5 230-kV transmission line. This project involves accessing each bore hole location with a auger/drill rig and light crew trucks, setting up the drill rig, drilling, collecting soil samples and breaking down the drilling setup. Existing access roads and vehicles such as pickup trucks & crew trucks will be used to bring personnel and equipment to the work areas. The attached maps show the project areas situated within Sections 7, 18, 30 & 31

198

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

199

Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242- Dec. 17, 2014  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS–0486; Draft EIS) for a 90-day public comment period. DOE also announces 15 public hearings to receive comments on the Draft EIS. In addition, DOE invites comments on the National Historic Preservation Act Section 106 process and any potential adverse impacts to historic properties from the proposed Project.

200

EIS-0443: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Record of Decision 3: Record of Decision EIS-0443: Record of Decision Project Financing for Southwest Intertie Project - South The U.S. Department of Energy (DOE), Western Area Power Administration, is considering whether to provide partial financing of the southern portion of the Southwest lntertie Project (SWIP-South) which consists of approximately 235 miles of 500- kilovolt (kV) transmission line. SWIP-South would extend from Harry Allen substation near Las Vegas, Nevada northward to the proposed Thirtymile Substation near Ely, Nevada. Partial financing of SWlP-South is being considered under the provisions of Western's Transmission Infrastructure Program. Final Environmental Impact Statement Project Financing for Southwest Intertie Project - South, DOE/EIS-0443 (January 2010)

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EIS-0439: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9: Record of Decision 9: Record of Decision EIS-0439: Record of Decision Rice Solar Energy Project, Riverside County, CA For more information, contact: Ms. Liana Reilly Environmental Project Manager Corporate Services Office Western Area Power Administration A7400, P.O. Box 281213 Lakewood, CO 80228 Telephone:(720) 962-7253 Fax: (720) 962-7263 E-mail: reilly@wapa.gov Western Area Power Administration (Western) received a request from Rice Solar Energy, LLC (RSE) to interconnect its proposed Rice Solar Energy Project (Project) to Western's Parker-Blythe No. 2 Transmission Line. The Project would be located in eastern Riverside County, California, near State Route 62, approximately 40 miles northwest of Blythe, California, and 15 miles west of Vidal Junction, California. On June 10, 2011, the Notice

202

EIS-0427: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Record of Decision 7: Record of Decision EIS-0427: Record of Decision Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona Western Area Power Administration (Western) received a request from Foresight Flying M, LLC (Foresight) to interconnect its proposed Grapevine Canyon Wind Project (Project) to Western's Glen Canyon-Pinnacle Peak No. 1 and No. 2 transmission lines. The Project would be located about 28 miles south and east of Flagstaff, in Coconino County, Arizona. On June 8, 2012, the Notice of Availability of the Final Environmental Impact Statement (EIS) for Grapevine Canyon Wind Project was published in the Federal Register (77 FR 34041). After considering the environmental impacts, Western has decided to allow Foresight's request for interconnection to

203

Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

204

Administrative Records Schedule: Communication Records | Department...  

Office of Environmental Management (EM)

Administrative Records Schedule: Communication Records Administrative Records Schedule: Communication Records The principal records documenting communication function...

205

EIS-0421: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

: Record of Decision : Record of Decision EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington For more information contact: Ms. Stacy Mason, Environmental Coordinator Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-5455 Electronic mail: slmason@bpa.gov BPA has decided to construct the Big Eddy-Knight Transmission Project in Wasco County, Oregon and Klickitat County, Washington. This project consists primarily of constructing a new, approximately 28-mile-long, 500-kilovolt (kV) transmission line and ancillary facilities between BPA?s existing Big Eddy Substation in The Dalles, Oregon, to a proposed new Knight Substation that would be connected to an existing BPA line about 4

206

Record of Decision for the Los Banos-Gates Transmission Project (DOE/EIS-0128-SA-01)  

Broader source: Energy.gov (indexed) [DOE]

99 99 Federal Register / Vol. 66, No. 245 / Thursday, December 20, 2001 / Notices A copy of any motion to intervene must also be served upon the representative of the RAWA specified in item h, above. p. Agency Comments-Federal, state, and local agencies are invited to file comments on the subject application for surrender of exemption. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representative listed in item h, above. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 01-31311 Filed 12-19-01; 8:45 am] BILLING CODE 6717-01-P DEPARTMENT OF ENERGY Western Area Power Administration Los Banos-Gates Transmission Project AGENCY: Western Area Power

207

DOE/EA-1596: Finding of No Significant Impact for Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota (02/18/09)  

Broader source: Energy.gov (indexed) [DOE]

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION UPPER GREAT PLAINS CUSTOMER SERVICE REGION FINDING OF NO SIGNIFICANT IMPACT Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota DOEIEA-1596 AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) ACTION: Finding of No Significant Impact SUMMARY: Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation. Under its Open Access Transmission Service Tariff (Tariff), Western is required to respond to Basin's interconnection requests. Western's Tariff

208

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

209

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

maintenance and avian nesting removal maintenance and avian nesting removal between structures 180/1 & 188/2 of the existing Mead-Perkins 500-kV transmission line in Maricopa County, Arizona. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to conduct access road maintenance between structures 180/1 & 188/2 of the existing Mead-Perkins 500-kV transmission line. This will consist of blading and leveling out areas of the existing access road using dozers, bucket trucks, crew trucks and pickup trucks. This work is needed to facilitate avian nest removal at structures 180/1, 182/2, 186/2 & 188/2. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached A1ap shows the project areas are situated within Sections 13 & 24

210

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

211

2007 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of Decision Tribal Affairs 2007 Records of Decision October 5, 2007 - Klondike III Wind Project Power Purchase ROD (PDF, 14 pages, 136 KB) July 19, 2007 - NEPA Long-Term...

212

EIS-0337: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision EIS-0337: Record of Decision West Valley Demonstration Project Waste Management Activities In the Final West Valley Demonstration Project Waste Management...

213

EIS-0395: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Decision EIS-0395: Record of Decision San Luis Rio Colorado Project Record of Decision for the Western Area Power Administration San Luis Rio Colorado Project, DOEEIS-0395...

214

Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

and structure replacement and structure replacement along the existing Casa Grande-Empire 11~-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace structures and upgrade to a double circuit 230-kV transmission line on its Casa Grande-Empire115-kV transmission line, from Thornton Road to its Empire Substation, within Western's existing right-of-way. This will include the rebuild of 13.2 miles of transmission line, replacing the H-frame structures with steel monopole structures with foundations, hardware and insulator replacement and adding a overhead ground-wire over the entire length of the project. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk

215

EIS-0457: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Record of Decision Record of Decision EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR BPA decided to implement the Proposed Action Alternative from the Albany-Eugene 115-kilovolt (kV) No. 1 Transmission Line Rebuild Project Final Environmental Impact Statement (EIS) (DOE/EIS-0457, March 2012). The Proposed Action Alternative, which was identified as the agency's preferred alternative in the Final EIS, consists of rebuilding a 32-mile section of the existing Albany-Eugene 115-kV transmission line that extends from the Albany Substation in the City of Albany in Linn County, Oregon, to the Alderwood Tap near Junction City in Lane County, Oregon. EIS-0457-ROD-MAP-2012.pdf More Documents & Publications EIS-0457: Mitigation Action Plan EIS-0457: Final Environmental Impact Statement

216

Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop  

SciTech Connect (OSTI)

In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project team’s work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASC’s Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

Galarowicz, James

2014-01-06T23:59:59.000Z

217

Project Selection - Record Keeping (Spanish)  

E-Print Network [OSTI]

viven ? La disponibilidad de liderazgo y apoyo al programa del proyecto Los miembros nuevos, particularmente los m?s j?venes, quiz?s quieran concentrarse solamente en un proyecto. A medida que obtengan experiencia y confianza en el sistema de 4-H... usar el proyecto principal como la base de su desarrollo dentro de 4-H. Las tareas del proyecto que son satisfactorias y estimulantes deben continuar mientras sea posible. Entre mayor sea la participaci?n en un proyecto proveer? m?s oportunidades...

Howard, Jeff W.

2005-05-10T23:59:59.000Z

218

EIS-0487: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

87: Record of Decision EIS-0487: Record of Decision Freeport LNG Liquefaction Project, Brazoria County, Texas DOE Office of Fossil Energy issued a Record of Decision on granting...

219

SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet.  

Broader source: Energy.gov [DOE]

Fact sheet describes the ThunderPower hydrogen fuel cell bus that was demonstrated at SunLine Transit Agency from November 2002 to February 2003. The bus was evaluated by DOE’s Advanced Vehicle Testing Activity.

220

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington  

Broader source: Energy.gov [DOE]

The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

The photospheric solar oxygen project: II. Non-concordance of the oxygen abundance derived from two forbidden lines  

E-Print Network [OSTI]

In the Sun, the two forbidden [OI] lines at 630 and 636 nm were previously found to provide discrepant oxygen abundances. aims: We investigate whether this discrepancy is peculiar to the Sun or whether it is also observed in other stars. method: We make use of high-resolution, high signal-to-noise ratio spectra of four dwarf to turn-off stars, five giant stars, and one sub-giant star observed with THEMIS, HARPS, and UVES to investigate the coherence of the two lines. results: The two lines provide oxygen abundances that are consistent, within observational errors, in all the giant stars examined by us. On the other hand, for the two dwarf stars for which a measurement was possible, for Procyon, and for the sub-giant star Capella, the 636 nm line provides systematically higher oxygen abundances, as already seen for the Sun. conclusions: The only two possible reasons for the discrepancy are a serious error in the oscillator strength of the NiI line blending the 630 nm line or the presence of an unknown blend in...

Caffau, Elisabetta; Malherbe, Jean-M; Bonifacio, Piercarlo; Steffen, Matthias; Monaco, Lorenzo

2013-01-01T23:59:59.000Z

222

EIS-0159: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Record of Decision 9: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

223

EIS-0159: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

159: Record of Decision 159: Record of Decision EIS-0159: Record of Decision Flatiron-Erie 115-kilovolt Transmission Line Project, Larimer County, Boulder County, Weld County, Colorado The Department of Energy (DOE), Western Area Power Administration (Western) has prepared this Record of Decision (ROD) pursuant to regulations of the Council on Environmental Quality (40 CFR Part 1505) and Implementing Procedures of the Department of Energy (10 CFR Part 1021). This ROD is based upon the information contained in the ''Final Environmental Impact Statement, Flatiron-Erie 115-kV Transmission Line, Larimer, Boulder & Weld Counties, Colorado'' (DOE/EIS-0159). Western has considered all public and regulatory comments received on the final EIS in preparation of this ROD. DOE/EIS-0159, Western Area Power Administration Flatiron-Erie 115-kilovolt

224

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Electrical Interconnection of the Windy Point Wind Energy Project Electrical Interconnection of the Windy Point Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS.1 The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. DOE/EIS-0183, Bonneville Power Administration, Record of Decision for the

225

A FOURTH H I 21 cm ABSORPTION SYSTEM IN THE SIGHT LINE OF MG J0414+0534: A RECORD FOR INTERVENING ABSORBERS  

SciTech Connect (OSTI)

We report the detection of a strong H I 21 cm absorption system at z = 0.5344, as well as a candidate system at z = 0.3389, in the sight line toward the z = 2.64 quasar MG J0414+0534. This, in addition to the absorption at the host redshift and the other two intervening absorbers, takes the total to four (possibly five). The previous maximum number of 21 cm absorbers detected along a single sight line is two and so we suspect that this number of gas-rich absorbers is in some way related to the very red color of the background source. Despite this, no molecular gas (through OH absorption) has yet been detected at any of the 21 cm redshifts, although, from the population of 21 cm absorbers as a whole, there is evidence for a weak correlation between the atomic line strength and the optical-near-infrared color. In either case, the fact that so many gas-rich galaxies (likely to be damped Ly{alpha} absorption systems) have been found along a single sight line toward a highly obscured source may have far-reaching implications for the population of faint galaxies not detected in optical surveys, a possibility which could be addressed through future wide-field absorption line surveys with the Square Kilometer Array.

Tanna, A.; Webb, J. K. [School of Physics, University of New South Wales, Sydney, NSW 2052 (Australia); Curran, S. J. [Sydney Institute for Astronomy, School of Physics, University of Sydney, NSW 2006 (Australia); Whiting, M. T. [CSIRO Astronomy and Space Science, P.O. Box 76, Epping, NSW 1710 (Australia); Bignell, C., E-mail: sjc@physics.usyd.edu.au [National Radio Astronomy Observatory, P.O. Box 2, Rt. 28/92 Green Bank, WV 24944-0002 (United States)

2013-08-01T23:59:59.000Z

226

EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy’s Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration so that WAPA could supplement it in support of WAPA’s National Environmental Policy Act requirements for a related project.

227

Department of Energy Finalizes $102 Million Loan Guarantee to Record Hill  

Broader source: Energy.gov (indexed) [DOE]

Finalizes $102 Million Loan Guarantee to Finalizes $102 Million Loan Guarantee to Record Hill Wind, LLC for Maine Wind Project Department of Energy Finalizes $102 Million Loan Guarantee to Record Hill Wind, LLC for Maine Wind Project August 15, 2011 - 11:08am Addthis Project Expected to Fund Approximately 200 Jobs and Provide Improvements to Wind Turbine Performance Washington D.C. - U.S. Energy Secretary Steven Chu today announced the Department of Energy finalized a $102 million loan guarantee to Record Hill Wind, LLC. The loan guarantee, in conjunction with an investment by the Yale University Endowment, will support the Record Hill wind project, which consists of a 50.6 megawatt wind power plant, an eight mile transmission line and associated interconnection equipment near the town of Roxbury,

228

Device Oriented Project Controller  

SciTech Connect (OSTI)

This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.

Dalesio, Leo; Kraimer, Martin

2013-11-20T23:59:59.000Z

229

RECORD OF CATEGORICAL EXCLUSION DETERMINATION A  

Broader source: Energy.gov (indexed) [DOE]

infrastructure infrastructure replacementalong the existing ED4-ED5 transmission line in Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A . Proposed Action: Western proposes to replace 9.2 miles of 115-kV wood H-frame structures with 230-kV double-circuit steel monopoles and the existing conductor with a single circuit of 1272 kcmil ACSS. The second circuit will not be installed as a part of this project. The rebuild will include new hardware and insulators as well as one optical groundwire (OPGW) for the entire length of the line. Western will use existing access roads to bring personnel and equipment to the work area. The new lines will be designed to accommodate growth in the area by providing additional clearances from encroachments. Work will be conducted within Western's 100-foot

230

PV Manufacturing R&D Project Status and Accomplishments Under 'In-Line Diagnostics and Intelligent Processing' and 'Yield, Durability and Reliability'  

SciTech Connect (OSTI)

The PV Manufacturing R&D (PVMR&D) Project conducts cost-shared research and development programs with U.S. PV industry partners. There are currently two active industry partnership activities. 'In-line Diagnostics and Intelligent Processing', launched in 2002, supports development of new in-line diagnostics and monitoring with real-time feedback for optimal process control and increased yield in the fabrication of PV modules, systems, and other system components. 'Yield, Durability and Reliability', launched in late 2004, supports enhancement of PV module, system component, and complete system reliability in high-volume manufacturing. A second key undertaking of the PVMR&D Project is the collection and analysis of module production cost-capacity metrics for the U.S. PV industry. In the period from 1992 through 2005, the average module manufacturing cost in 2005 dollars fell 54% (5.7% annualized) to $2.73/Wp, and the capacity increased 18.5-fold (25% annualized) to 251 MW/yr. An experience curve analysis gives progress ratios of 87% and 81%, respectively, for U.S. silicon and thin-film module production.

Friedman, D. J.; Mitchell, R. L.; Keyes, B. M.; Bower, W. I.; King, R.; Mazer, J. A.

2006-01-01T23:59:59.000Z

231

ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

4: INFORMATIONAL SERVICES RECORDS ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS This schedule covers certain records pertaining to informational services...

232

Off-line ionization tests using the surface and the plasma ion sources of the SPES project  

SciTech Connect (OSTI)

The development of new target ion source systems for the selective production of exotic species (SPES) facility is currently in progress at Legnaro National Laboratories. In this context, the study of ion sources and their performance in terms of ionization efficiency and transversal emittance is a crucial point in order to maximize the available yields, particularly for short-lived isotopes. In this work, preliminary off-line ionization efficiency and emittance measurements for the SPES surface and plasma ion sources are presented. The plasma source emittance measurements are supported by dedicated numerical calculations.

Manzolaro, M.; Vasquez, J.; Montano, J.; Andrighetto, A.; Scarpa, D. [INFN - Legnaro National Laboratories, Legnaro, Padova (Italy); Manente, M. [CISAS (Centro Interdipartimentale Studi Attivita Spaziali), University of Padova, Via Venezia 1, Padova (Italy); Curreli, D.; Meneghetti, G. [Department of Mechanical Engineering, University of Padova, Via Venezia 1, Padova (Italy); Pavarin, D. [CISAS (Centro Interdipartimentale Studi Attivita Spaziali), University of Padova, Via Venezia 1, Padova (Italy); Department of Mechanical Engineering, University of Padova, Via Venezia 1, Padova (Italy)

2012-02-15T23:59:59.000Z

233

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

maintenance maintenance along the exis!ing Blythe-Knob 161-kV transmission Ime in Maricopa County. Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace broken crossarms at structures 32/3,6312 and cross brace repair at structure 31/2 along the existing Blythe - Knob 161-kV transmission line. Western will access structures using crew trucks and pickup trucks along existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached maps show the project area is situated within Sections 15 & 21 Township 11 South Range 20 East & Section 10 Township 16 South Range 21 East on the San Bernardino Meridian, Imperial County, California. The corresponding

234

Vital Records  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes Department-wide requirements, roles and responsibilities for implementing and maintaining a Vital Records program as required by the Federal Records Act in support of the DOE Continuation of Operations Plan. No cancellations.

2006-02-02T23:59:59.000Z

235

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE...  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This...

236

Bonneville Power Administration Record of Decision for the Electrical Interconnection of the Summit/Westward Project (DOE/EIS-0183) (7/25/03)  

Broader source: Energy.gov (indexed) [DOE]

Summit/Westward Project Summit/Westward Project July 2003 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the proposed Summit/Westward Project ("Project") into the Federal Columbia River Transmission System (FCRTS) at BPA's Allston Substation. The Project, which has been proposed by Westward Energy, LLC (Westward Energy), involves construction and operation of a 520-megawatt (MW) natural-gas-fired, combined-cycle generating facility. The facility will be located in Columbia County, Oregon, about 4.5 miles north of Clatskanie, Oregon. The decision to offer terms to interconnect the Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan

237

DOE/EIS-0183: Record of Decision for the Electrical Interconnection of the Shepherds Flat Wind Energy Project (07/18/08)  

Broader source: Energy.gov (indexed) [DOE]

Shepherds Flat Wind Energy Project Shepherds Flat Wind Energy Project July 2008 B o n n e v i l l e P o w e r A d m i n i s t r a t i o n 1 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard and will provide transmission access for up to 846 MW from the Wind

238

Record of Decision for the Electrical Interconnection of the BP Cherry Point Cogeneration Project (DOE/EIS-0349) (11/10/04)  

Broader source: Energy.gov (indexed) [DOE]

BP Cherry Poi BP Cherry Poi nt Cogeneration Project DECISION The Bonneville Power Administration (Bonneville) has decided to implement the proposed action identified in the BP Cherry Point Cogeneration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0349, August 2004). Under the proposed action, Bonneville will offer contract terms for interconnection of the BP Cherry Point Cogeneration Project (Project) with the Federal Columbia River Transmission System (FCRTS), as requested by BP West Coast Products, LLC (BP) and proposed in the FEIS. The proposed Project involves constructing and operating a new 720-megawatt (MW) natural gas-fired, combined-cycle power generation facility at a 265-acre site adjacent to BP's existing Cherry Point Refinery between Ferndale and

239

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Goodnoe Hills and White Creek Wind Energy Goodnoe Hills and White Creek Wind Energy Projects The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 350 megawatts (MW) of power to be generated by the proposed Goodnoe Hills (150 MW) and White Creek (200 MW) Wind Energy Projects (Wind Projects) into the Federal Columbia River Transmission System (FCRTS). The Wind Projects will be interconnected at the proposed BPA Rock Creek substation. This substation will be constructed as a 500/230-kilovolt (kV) substation along BPA's Wautoma - John Day No.1 500-kV transmission line. These proposed facilities will be located in Klickitat County, Washington. DOE/EIS-0183, Record of Decision for the Electrical Interconnection of the Goodnoe Hills and White Creek Wind Energy Projects (October 2005)

240

EIS-0352: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Record of Decision 2: Record of Decision EIS-0352: Record of Decision Western Area Power Administration Modification and Construction of Transmission Lines for the U.S. 93 Hoover Dam Bypass Project The Federal Highway Administration (FHWA) prepared an Environmental Impact Statement (EIS) for construction of a new segment of U.S. Highway 93 for the purpose of improving congestion and hazardous vehicle/pedestrian conflicts where the highway crosses the Colorado River over Hoover Dam. As a cooperating agency for the EIS, Western Area Power Administration (Western) proposed modifications to its transmission system and facilities to accommodate the construction of the new highway and bridge spanning the Colorado River. Record of Decision for Western Area Power Administration Modification and

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Broader source: Energy.gov (indexed) [DOE]

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

242

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

243

ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

4: PROPERTY DISPOSAL RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 4: PROPERTY DISPOSAL RECORDS (Revision 2) These records pertain to the sales by agencies of real and...

244

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

20: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

245

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS | Department...  

Broader source: Energy.gov (indexed) [DOE]

AUDIOVISUAL RECORDS ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS This schedule covers audiovisual and related records created by or for Department and those acquired in...

246

ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision...  

Broader source: Energy.gov (indexed) [DOE]

AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) This schedule covers audiovisual and related records created by or for...

247

ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS | Department...  

Office of Environmental Management (EM)

0: ELECTRONIC RECORDS ADMINISTRATIVE RECORDS SCHEDULE 20: ELECTRONIC RECORDS This schedule authorizes the disposition of specified electronic records and hard-copy or microform...

248

EIS-0413: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Record of Decision EIS-0413: Record of Decision Searchlight Wind Energy Project, Searchlight, NV After considering potential environmental impacts, Western Area Power...

249

EIS-0440: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

40: Record of Decision EIS-0440: Record of Decision Quartzsite Solar Energy Project, La Paz County, AZ After considering potential environmental impacts, Western Area Power...

250

EIS-0454: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Record of Decision EIS-0454: Record of Decision Tonopah Solar Energy, LLC, Crescent Dunes Solar Energy Project (September 2011) For more information, contact: Ms. Angela...

251

EIS-0374: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Record of Decision EIS-0374: Record of Decision Klondike III Biglow Canyon Wind Integration Project The Bonneville Power Administration (BPA) has decided to implement the...

252

EIS-0169: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Record of Decision EIS-0169: Record of Decision Bonneville Power Administration Yakima Fisheries Project As Administrator of the Bonneville Power Administration (BPA), I have...

253

EIS-0349: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

49: Record of Decision EIS-0349: Record of Decision Electrical Interconnection of the BP Cherry Point Cogeneration Project The Bonneville Power Administration (Bonneville) has...

254

Notice of Availability of the Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project -- Business Plan Final EIS (DOE/EIS-0183) (10/29/04)  

Broader source: Energy.gov (indexed) [DOE]

45 45 Federal Register / Vol. 69, No. 209 / Friday, October 29, 2004 / Notices Issued at Washington, DC on October 26, 2004. Rachel M. Samuel, Deputy Advisory Committee Management Officer. [FR Doc. 04-24217 Filed 10-28-04; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Bonneville Power Administration; Summit/Westward Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Revised Record of Decision (ROD). SUMMARY: This notice announces the availability of the Revised ROD to offer contract terms for an optional electrical interconnection of the proposed Summit/Westward Project into the Federal Columbia River Transmission System at a point near the existing Wauna Substation of the Clatskanie

255

LTS Project Management - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transition LTS Execution Project Management Planning Resource Management Reporting Interface Management Communications (InternalExternal) Information Management Records...

256

Record Series Descriptions: Los Alamos National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Los Alamos National Laboratory Los Alamos National Laboratory Project Y (MED Era Director's Office & Lab Management) Records Director's Office & Laboratory Management Files Director's Office & Laboratory Management Files (microfilm) Robert Underhill Files Records of CMB DO (Chemistry-Metallurgy-Baker Division Offices) GMX-5 (Dynamic Weapons Testing Division), RaLa (Radiolanthanum) Groups Test Records Health Division Central Administrative Records H-4 (Bio-Medical Research Subdivision of Health Division) Central Administrative Records Bio-Medical Research Group, Wright Langham Papers Records of J-Division (Weapons Testing), Central Administrative Files Records of N-Division (Nuclear Rocket Propulsion Division), Rover Program Central Administrative Files Medium Energy Physics Division, Central File Records

257

Standard Review Plan- Code of Record  

Broader source: Energy.gov [DOE]

The objective of this Standard Review Plan (SRP) on Code of Record (COR) is to provide guidance for a uniform review of the COR for DOE nuclear projects.

258

EIS-0427: Grapevine Canyon Wind Project, Coconino County, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

27: Grapevine Canyon Wind Project, Coconino County, Arizona 27: Grapevine Canyon Wind Project, Coconino County, Arizona EIS-0427: Grapevine Canyon Wind Project, Coconino County, Arizona Summary This EIS evaluates the environmental impacts of a proposed wind energy generation project in Coconino County, Arizona, on privately owned ranch lands and trust lands administered by the Arizona State Land Department. The proposed project includes a new transmission tie-line that would cross lands administered by Coconino National Forest and interconnect with DOE's Western Area Power Administration's existing Glen Canyon-Pinnacle Peak transmission lines. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download September 11, 2012 EIS-0427: Record of Decision Interconnection of the Grapevine Canyon Wind Project, Coconino County,

259

EIS-0395: Notice of Record of Decision and Floodplain Statement...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0395: Notice of Record of Decision and Floodplain Statement of Findings San Luis Rio Colorado Project Western Area Power Administration San Luis Rio Colorado Project, EIS-0395...

260

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Letter from Deputy Secretary Poneman to Clean Line Energy Regarding...  

Office of Environmental Management (EM)

Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Advance...

262

Amended Notice of Intent for the Northern Pass Transmission Line...  

Broader source: Energy.gov (indexed) [DOE]

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

263

IMPEE PhD Opportunity Project title: LightFoot PhD A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal  

E-Print Network [OSTI]

to simulate this behaviour. This is to provide guidance to overhead line design engineers on lightening Overhead Lines with Non-Ideal Tower Footing Resistance Supervisor(s): Dr Jonathan Swingler j.swingler@hw.ac.uk Abstract LightFoot PhD ­ A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal Tower

Greenaway, Alan

264

Records Disposition  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To assign responsibilities and authorities and to prescribe policies, procedures, standards, and guidelines for the orderly disposition of records of the Department of Energy (DOE) and its management and operating contractors. Cancels DOE O 1324.2 dated 5-28-80. Chg 1 dated 4-9-92. Canceled by DOE O 1324.2B dated 1-12-95.

1988-09-13T23:59:59.000Z

265

Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

266

Notice of Availability of the Record of Decision for the Electrical Interconnection of the Satsop Combustion Turbine Project (5/8/02)  

Broader source: Energy.gov (indexed) [DOE]

5 5 Federal Register / Vol. 67, No. 89 / Wednesday, May 8, 2002 / Notices [FR Doc. 02-11308 Filed 5-7-02; 8:45 am] BILLING CODE 4000-01-C DEPARTMENT OF ENERGY [Solicitation Number DE-PS36-02GO92004] Hydrogen Research and Development AGENCY: Golden Field Office, DOE. ACTION: Issuance of Solicitation for Financial Assistance Applications. SUMMARY: The U.S. Department of Energy (DOE) is announcing its intention to seek Financial Assistance Applications for research and development (R&D) projects involving technologies for the production, storage, and utilization of hydrogen. DATES: Issuance of the Solicitation is planned for no later than early May, 2002. ADDRESSES: To obtain a copy of the Solicitation once it is issued, interested parties should access the DOE Golden Field Office home page at http://

267

Records Disposition  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To assign responsibilities and authorities and to prescribe policies, procedures, standards, and guidelines for the orderly disposition of records of the Department of Energy (DOE) and its operating and onsite service contractors. Cancels DOE O 1324.1 dated 7-10-78. Chg 1 dated 7-2-81. Chg 2 dated 11-9-82. Canceled by DOE O 1324.2A dated 9-13-88.

1980-05-28T23:59:59.000Z

268

ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS RECORDS |...  

Broader source: Energy.gov (indexed) [DOE]

records documenting communication functions include messenger service data; telecommunications service control and operational records; long distance telephone reports; postal...

269

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Third Quarter Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

270

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

271

County, CA. RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

access road maintenance access road maintenance and replacement of down guy wlfes and guy anchors on structure16/5 on the existing (Army Tap) Gila-Senator Wash 69-kV T.L. in Imperial County, CA. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to conduct maintenance on access roads leading to structure 16/5 of the Gila-Senator Wash 69kV Transmission Line. All work will be done along existing access roads. This will consist of blading and leveling out areas of the existing access road using dozers, bucket trucks, crew trucks and pickup trucks. A backhoe will be used during replacement of the anchor guy and down guys, This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project area situated within Section 5 Township 15

272

Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

N /A

2000-03-20T23:59:59.000Z

273

Contract/Project Management  

Office of Environmental Management (EM)

65% Cleanup 81% Line Item 56% Cleanup 1 Line Item system certified in 2nd qtr FY09 4. PDRI Use: By the end of FY11, 80% of projects (>100M) will use PDRI methodologies no later...

274

Audiovisual Records | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Audiovisual Records Audiovisual Records ADM 210.pdf More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 21:AUDIOVISUAL RECORDS (Revision 1) ADMINISTRATIVE RECORDS...

275

Perforated Patch Recording  

Science Journals Connector (OSTI)

Perforated patch recording is a special configuration in patch clamp recording that allows to measure whole?...

2006-01-01T23:59:59.000Z

276

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

277

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

First Quarter First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

278

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

279

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

280

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Fourth Quarter Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Coordination of Transmission Line Transfer Capabilities  

E-Print Network [OSTI]

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

282

Your Records Management Responsibilities  

Broader source: Energy.gov (indexed) [DOE]

Your Records Management Your Records Management Responsibilities Table of Contents INTRODUCTION RECORDS MANAGEMENT IN THE FEDERAL GOVERNMENT RECORDS MANAGEMENT IN THE DEPARTMENT OF ENERGY IMPORTANCE OF RECORDS MANAGEMENT YOUR RECORDS MANAGEMENT RESPONSIBILITIES RECORDS MANAGEMENT LIFE CYCLE ELECTRONIC RECORDS & RECORDKEEPING LAW, REGULATION, AND POLICY ASSISTANCE RECORDS MANAGEMENT TERMS 2 INTRODUCTION If you are a government employee or contractor working for a federal agency, records management is part of your job. This pamphlet explains your responsibilities for federal records and provides the context for understanding records management in the federal government and in the Department of Energy. TOP RECORDS MANAGEMENT IN THE FEDERAL GOVERNMENT

283

Project title:  

Broader source: Energy.gov (indexed) [DOE]

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

284

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

285

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

286

A model for life cycle records management  

SciTech Connect (OSTI)

The primary objective of this paper is to update an old Records Management concept; the management of records according to the records life cycle. Accordingly, the authors are presenting a new version of the Records Management life cycle model and its associated elements. The basic concept is that every record progresses through three phases; a record is created, is used and maintained, and dispositioned. In this presentation, the authors update the very old straight line model and the more current circular model with a new model that essentially combines the two. The model portrays Records Management as having a distinct straight-line beginning, a circular use and maintenance phase, and a distinct straight-line end. The presentation maps Records Management Program elements and activities against the phases depicted in the model. The authors believe that this new records life cycle model is an enhanced physical representation of the process. This presentation is designed to help put all of the specialized Records Management topics that participants have heard about during the conference in the perspective of the records life cycle.

Tayfun, A.C.; Gibson, S.

1996-10-01T23:59:59.000Z

287

The Snake River Geothermal Drilling Project - Innovative Approaches...  

Open Energy Info (EERE)

a complete record of the volcanic stratigraphy that can be used in complementary science projects. This project will function in tandem with Project Hotspot, a continental...

288

MATLAB Project #2: Matrix Operations To learn basic matrix operations and more useful features of MATLAB.  

E-Print Network [OSTI]

1 MATLAB Project #2: Matrix Operations Purpose: To learn basic matrix operations and more useful features of MATLAB. Part 1. Matrix arithmetic. = 65 43 21 A , - - = 654 321 B the above matrices using MATLAB commands first. Then type each line and record the result; if you get

Yang, Shih-Hsuan

289

EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR |  

Broader source: Energy.gov (indexed) [DOE]

57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR 57: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR Summary This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Public Comment Opportunities None available at this time. Documents Available for Download June 13, 2012 EIS-0457: Mitigation Action Plan Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Notice of Availability of a Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR June 13, 2012 EIS-0457: Record of Decision Albany-Eugene Rebuild Project, Lane and Linn Counties, OR

290

Record of Decision (ROD) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 26, 1996 December 26, 1996 EIS-0236: Record of Decision Record of Decision Programmatic Environmental Impact Statement for Stockpile Stewardship and Management December 13, 1996 EIS-0243: Record of Decision (December 1996) Environmental Impact Statement for the Nevada Test Site and Off-Site Locations in the State of Nevada November 8, 1996 EIS-0197: Record of Decision (November 1996) Delivery of the Canadian Entitlement October 17, 1996 EIS-0241: Record of Decision Hood River Fisheries Project, Hood River County, Oregon September 17, 1996 EIS-0249: Record of Decision (September 1996) Medical Isotopes Production Project: Molybdenum-99 and Related Isotopes September 13, 1996 EIS-0220: Supplemental Record of Decision Interim Management of Nuclear Materials at the Savannah River Site

291

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect (OSTI)

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

292

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

New power Line for new generator at ten sleep New power Line for new generator at ten sleep Dat e: 12114/10 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview 1. Brief project description (include Extend 3 phase power line from (existing) pole 99 to the Ten Sleep location for a new generator. The anything that could impact the transformer bank at the WDF will be dismantled, the line extended overhead, across 5 new power poles, to environment) the Ten Sleep Battery and the bank will be reassembled there. The new guy anchor at pole 99 will be located outside Palustrine wetlands. The line will be 34.5/19.920 KV, approximately 1,200 feet in length. 2. Legal location Ground disturbance will be minimal and have very little potential to affect the environment. 3. Duration of the project

293

The ATLAS 3D project - XVI. Physical parameters and spectral line energy distributions of the molecular gas in gas-rich early-type galaxies  

E-Print Network [OSTI]

[Abridged] We present a detailed study of the physical properties of the molecular gas in a sample of 18 molecular gas-rich early-type galaxies (ETGs) from the ATLAS$ 3D sample. Our goal is to better understand the star formation processes occurring in those galaxies, starting here with the dense star-forming gas. We use existing integrated $^{12}$CO(1-0, 2-1), $^{13}$CO(1-0, 2-1), HCN(1-0) and HCO$^{+}$(1-0) observations and present new $^{12}$CO(3-2) single-dish data. From these, we derive for the first time the average kinetic temperature, H$_{2}$ volume density and column density of the emitting gas, this using a non-LTE theoretical model. Since the CO lines trace different physical conditions than of those the HCN and HCO$^{+}$ lines, the two sets of lines are treated separately. We also compare for the first time the predicted CO spectral line energy distributions (SLEDs) and gas properties of our molecular gas-rich ETGs with those of a sample of nearby well-studied disc galaxies. The gas excitation con...

Bayet, Estelle; Davis, Timothy A; Young, Lisa M; Crocker, Alison F; Alatalo, Katherine; Blitz, Leo; Bois, Maxime; Bournaud, Frédéric; Cappellari, Michele; Davies, Roger L; de Zeeuw, P T; Duc, Pierre-Alain; Emsellem, Eric; Khochfar, Sadegh; Krajnovi?, Davor; Kuntschner, Harald; McDermid, Richard M; Morganti, Raffaella; Naab, Thorsten; Oosterloo, Tom; Sarzi, Marc; Scott, Nicholas; Serra, Paolo; Weijmans, Anne-Marie

2012-01-01T23:59:59.000Z

294

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

2 2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

295

CERN News: Selection of the type of superconducting coil for the Omega project; New intensity records at the proton synchrotron; Progress with the Spiral Reader film measuring equipment; New technique at transition energy on the proton synchrotron; CERN Courier 10th anniversary; Equipment travelling from and to Serpukhov  

E-Print Network [OSTI]

CERN News: Selection of the type of superconducting coil for the Omega project; New intensity records at the proton synchrotron; Progress with the Spiral Reader film measuring equipment; New technique at transition energy on the proton synchrotron; CERN Courier 10th anniversary; Equipment travelling from and to Serpukhov

1969-01-01T23:59:59.000Z

296

Record Hill | Open Energy Information  

Open Energy Info (EERE)

Record Hill Record Hill Jump to: navigation, search Name Record Hill Facility Record Hill Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Wagner Wind Energy - Independence Wind LLC Developer Wagner Wind Energy - Independence Wind LLC Location Roxbury ME Coordinates 44.66175478°, -70.63453674° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.66175478,"lon":-70.63453674,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

297

Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

53/6 53/6 maintenance along the existing Casa Grande-Saguaro 115-kV transmission line Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to replace crossarms at structure 53/6 of its Casa Grande-Saguaro 115-kV transmission line, within Western's existing right-of- way. Western will access the structure using crew trucks along the existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project area on private land situated within Section 13 Township 10 South Range 9 East on the Gila & Salt River Meridian, Pinal County, Arizona. Corresponding U.S.G.S. 7.5-minute topographic is Samaniego Hills, Arizona. This work is planned to begin the week of December 27,2010.

298

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

299

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Broader source: Energy.gov (indexed) [DOE]

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) 2013 Annual Planning Summary for the Southwestern Area Power Administration

300

Communications Records | Department of Energy  

Office of Environmental Management (EM)

Communications Records Communications Records ADM 120.pdf More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 12: COMMUNICATIONS RECORDS ADM 12 PDF Administrative...

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EIS-0397: DOE Notice of Availability of the Record of Decision...  

Broader source: Energy.gov (indexed) [DOE]

of Availability of the Record of Decision Bonneville Power Administration Lyle Falls Fish Passage Project This notice announces the availability of the Record of Decision to...

302

EIS-0183: DOE Notice of Availability of the Record of Decision...  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision EIS-0183: DOE Notice of Availability of the Record of Decision Electrical Interconnection of the Kittitas Valley Wind Project The Bonneville Power...

303

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

304

EIS-0376: Record of Decision | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

76: Record of Decision EIS-0376: Record of Decision White Wind Farm Project White Wind Farm, LLC (Applicant), a wholly-owned subsidiary of Navitas Energy, Inc., has applied to the...

305

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS | Department of...  

Office of Environmental Management (EM)

DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS DOE RECORDS SCHEDULE FOR ENVIRONMENTAL RECORDS This schedule provides for the disposition of U.S. Department of Energy (DOE) records...

306

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

4 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A This metric has been overcome by events. Beginning in FY10, EM projects are to be measured against metric #1 above. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12,

307

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

8 4 8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

308

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

addition of addition of aerial marker balls along the existing Prescott -Pinnacle Peak & Pinnacle Peak-Rogers 230-kV Transmission Line right-of-ways located in Maricopa County, Arizona. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes removing 2 existing marker balls at structures 0/4 & 0/5 of the Pinnacle Peak-Rogers #1 & #2 230-kV double circuit transmission line & installing aerial marker ball equipment on all static wires (overhead ground wires) of the Prescott-Pinnacle Peak 230-kV transmission line on the north side of structures 216/1-216/3 & the southeast side of structures 0/3-0/5 on the Pinnacle Peak-Rogers #1 & #2 230-kV double circuit transmission line. The diverters will be installed using a hot stick by accessing the structure using existing access roads and

309

Help Line  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Help Line Help Line Ombuds Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns and want advice or referral while preserving confidentiality and anonymity. Callers may remain anonymous and the Help Line does not have caller ID or other methods of identifying callers. The Help Line maintains the same level of confidentiality and neutrality as the other Ombuds services. The Ombuds Help Line is not for reporting emergencies or officially

310

Request For Records Disposition Authority: Strategic Petroleum Reserve  

Broader source: Energy.gov (indexed) [DOE]

Request For Records Disposition Authority: Strategic Petroleum Request For Records Disposition Authority: Strategic Petroleum Reserve Project Management Office Request For Records Disposition Authority: Strategic Petroleum Reserve Project Management Office Paper case files pertaining to environmental permit applications, permits and related correspondence as well as NEPA correspondence within of the Strategic Petroleum Reserve Project Management Office (SPRPMO) Request For Records Disposition Authority: Strategic Petroleum Reserve Project Management Office More Documents & Publications 2012 Annual Planning Summary for Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office CX-002673: Categorical Exclusion Determination CX-009794: Categorical Exclusion Determination

311

EIS-0395: Record of Decision and Floodplain Statement of Findings...  

Broader source: Energy.gov (indexed) [DOE]

of North Branch Holding, LLC. Record of Decision and Floodplain Statement of Findings for Western Area Power Administration San Luis Rio Colorado Project, DOEEIS-0395 (October...

312

Request For Records Disposition Autnority | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Autnority Request For Records Disposition Autnority Published Posters. Posters depicting Department of Energy facilities, research projects, security awareness themes, and related...

313

EIS-0249: Record of Decision (September 1996) | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Decision (September 1996) EIS-0249: Record of Decision (September 1996) Medical Isotopes Production Project: Molybdenum-99 and Related Isotopes The Department of Energy (DOE) is...

314

EIS-0389: Record of Decision and Floodplain Statement of Findings...  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision and Floodplain Statement of Findings for the Trinity Public Utilities District Direct Interconnection Project (73 FR 5184) Western Area Power Administration...

315

EIS-0409: Record of Decision and Statement of Findings | Department...  

Broader source: Energy.gov (indexed) [DOE]

impact statement associated with a proposed project using Integrated Gasification Combined Cycle Technology in Kemper County, Mississippi. Record of Decision and Statement...

316

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Structure Replacement Hayden-Gore Pass 138-kV transmission line (Structure 25/5) Spring 20 I 0 Structure Replacement Hayden-Gore Pass 138-kV transmission line (Structure 25/5) Spring 20 I 0 A. Brief Description of Proposal: Western proposes to replace structure 25/5 on the Hayden-Gore Pass 138-kV transmission line. The structure is located on U.S. Forest Service lands (T.2N, R. 82W, Section 35; Gore Pass 7.5' USGS quadrangle map. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 CFR 1021, Subpart D.) B 4.6 Additions or modifications to electric power h'ansmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock, grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators and

317

DOE Hydrogen and Fuel Cells Program Record 9017: On-Board Hydrogen...  

Broader source: Energy.gov (indexed) [DOE]

Hydrogen Storage Systems - Projected Performance and Cost Parameters DOE Hydrogen and Fuel Cells Program Record 9017: On-Board Hydrogen Storage Systems - Projected Performance...

318

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

319

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

320

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Record of Decision (ROD) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 13, 2002 September 13, 2002 EIS-0183: Record of Decision GNA Cliffs Energy Project September 6, 2002 EIS-0200: Revision to the Record of Decision Treatment and Storage of Transuranic Waste August 19, 2002 EIS-0303: Record of Decision Savannah River Site High-Level Waste Tank Closure July 10, 2002 EIS-0220: Supplemental Record of Decision Interim Management of Nuclear Materials July 9, 2002 EIS-0293: Amended Record of Decision Conveyance and Transfer of Certain Land Tracts Administered by the Department of Energy and Located at Los Alamos National Laboratory, Los Alamos and Santa Fe Counties, New Mexico April 19, 2002 EIS-0229: Amended Record of Decision (April 2002) Surplus Plutonium Disposition Program April 19, 2002 EIS-0283: Amended Record of Decision Surplus Plutonium Disposition Program

322

Code of Record Standard Review Plan (SRP)  

Broader source: Energy.gov [DOE]

The objective of this Standard Review Plan (SRP) on Code of Record (COR) is to provide guidance for a uniform review of the COR for DOE nuclear projects. DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

323

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

324

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Sectionalize SPENCE-DAVE JOHNSTON 230-kV line near Casper Sectionalize SPENCE-DAVE JOHNSTON 230-kV line near Casper A. HriefDescription of Proposed Action: The Western Area Power Adminish'ation (Western), Loveland, Colorado, is responding to a request by PacifiCorp Energy (PacifiCorp) to reroute a small section of Western's Dave Johnston to Spence transmission line onto 0.8 miles of new right-of-way in the vicinity ofPacifiCorp's Casper substation. Western would own the new right- of-way acquired by PacifiCorp. The reroute would accommodate activites that PacifiCorp needs to accomplish at their substation. The line is located near Casper, Natrona County, Wyoming. Maps of the Project area are in the enclosed draft report. B. Number and Title of the Categorical Exclusion Heinl! Aoolied: (See text in 10 CFR 1021,

325

Project Year Project Team  

E-Print Network [OSTI]

(Karl) Zhang, Undergraduate Student, Biomedical Engineering, Whiting School of Engineering; Cheryl Kim Audio, Digital Video Project Abstract The goal of this project is to develop online modular units

Gray, Jeffrey J.

326

EIS-0183: Revised Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Revised Record of Decision Revised Record of Decision EIS-0183: Revised Record of Decision Electrical Interconnection of the Summit/Westward Project The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. DOE/EIS-0183, Bonneville Power Administration, Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project (October

327

Use of Optical and Imaging Techniques for Inspection of Off-Line Joule-Heated Melter at the West Valley Demonstration Project  

SciTech Connect (OSTI)

The West Valley melter has been taken out of service. Its design is the direct ancestor of the current melter design for the Hanford Waste Treatment Plant. Over its eight years of service, the West Valley melter has endured many of the same challenges that the Hanford melter will encounter with feeds that are similar to many of the Hanford double shell tank wastes. Thus, inspection of the West Valley melter prior to its disposal could provide valuable--even crucial--information to the designers of the melters to be used at the Hanford Site, particularly if quantitative information can be obtained. The objective of Mississippi State University's Diagnostic Instrumentation and Analysis Laboratory's (DIAL) efforts is to develop, fabricate, and deploy inspection tools for the West Valley melter that will (i) be remotely operable in the West Valley process cell; (ii) provide quantitative information on melter refractory wear and deposits on the refractory; and (iii) indicate areas of heterogeneity (e.g., deposits) requiring more detailed characterization. A collaborative arrangement has been established with the West Valley Demonstration Project (WVDP) to inspect their melter.

Plodinec, M. J.; Jang, P-R; Long, Z.; Monts, D. L.; Philip, T.; Su, Y.

2003-02-25T23:59:59.000Z

328

CONDUCTING A RECORDS INVENTORY  

Broader source: Energy.gov (indexed) [DOE]

PROCEDURE FOR CONDUCTING A RECORDS INVENTORY PROCEDURE FOR CONDUCTING A RECORDS INVENTORY Revision 1 10/31/07 Approved by: DOE Records Management Division, IM-23 PROCEDURE FOR CONDUCTING A RECORDS INVENTORY 1. GENERAL. A records inventory is compiling a descriptive list of each record series or system, including the location of the records and any other pertinent data. A records inventory is not a list of each document or each folder. 2. DEFINE THE RECORDS INVENTORY GOAL(S). The goals of a records inventory should be to: a. Gather information for scheduling purposes; b. Prepare for conversion to other media or to identify the volume of classified and/or permanent records in your organization's custody; and c. Identify any existing shortcomings, deficiencies, or problems with

329

PRESERVATION OF FEDERAL RECORDS  

Broader source: Energy.gov (indexed) [DOE]

PRESERVATION OF FEDERAL RECORDS PRESERVATION OF FEDERAL RECORDS The Federal Records Act requires the Department of Energy (DOE) Records Officer to remind departing Federal and contractor employees that Federal records may not be removed from Government custody nor may they be destroyed except in accordance with a records disposition schedule that has been approved by the Archivist of the United States. The creation of adequate documentation and the preservation of Federal records are required by law and regulation (contained in 36 CFR Chapter XII). As Federal and contractor employees, you have Federal record-keeping responsibilities that are regulated by the National Archives and Records Administration (NARA) to ensure the retention and preservation of Federal records. PURPOSE The purpose of this brochure is to provide records exit procedures for

330

ADMINISTRATIVE RECORDS SCHEDULE 21:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 21: AUDIOVISUAL RECORDS June 2007 Revision 1 This schedule covers audiovisual and related records created by or for Department and those acquired in the normal course of business. For audiovisual records that are not described in this schedule, an SF 115, Request for Records Disposition Authority, must be submitted to the National Archives and Records Administration (NARA). Audiovisual records include still and motion picture photography, graphic materials, and sound and video recordings. Related documentation includes (1) production files or other files documenting the creation, justification, ownership, and rights to the records and (2) finding aids used to identify or access the records. This schedule does not cover: (1) cartographic records, (2) remote sensing imagery

331

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Categorical Exclusion for erosion repair and cactus relocation along the existing Tucson-Apache 11S-kV transmission line in Pima County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to construct a new access road along the existing Tucson-Apache 11S-kV transmission line within the existing right-of-way and to repair erosion damage at transmission line structures. Access road construction will consist of stripping, clearing and removing vegetation and blading and leveling to create a road within the existing right-of-way between structures 24/7-2S/2 & 2S/3- 26/S. We will be installing two gates to limit right-of-way access from Houghton Road. We will be creating reinforced embankments through the placement of

332

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

333

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

334

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

335

LM Records Handling System-Fernald Historical Records System...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fernald Historical Records System, Office of Legacy Management LM Records Handling System-Fernald Historical Records System, Office of Legacy Management LM Records Handling...

336

DOERS Records Schedule Cross Index to DOE Administrative Records...  

Office of Environmental Management (EM)

DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules DOERS Records Schedule Cross Index to DOE Administrative Records Disposition Schedules...

337

DOE Fuel Cell Technologies Program Record, Record # 11003, Fuel...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Program Record, Record 11003, Fuel Cell Stack Durability DOE Fuel Cell Technologies Program Record, Record 11003, Fuel Cell Stack Durability Dated May 3, 2012, this program...

338

GENERAL RECORDS SCHEDULE 1  

Broader source: Energy.gov (indexed) [DOE]

39 39 DEPARTMENT OF ENERGY ADMIN1STRATIVE RECORDS SCHEDULE 1: PERSONNEL RECORDS June 2007 Revision 2 As do all Administrative Records Schedules (ADMs), ADM-1 covers records of the Department and its contractors. The records include, employee concerns programs, labor agreements and negotiations, labor relations, academic and outreach programs, apprenticeship programs, job vacancies, unemployment compensation, recruitment and employee health. The most important types of records are the Official Personnel Folders, the Service Record Cards, and the Employee Medical Folders. Those for Federal employees are maintained according to The Guide to Personnel Recordkeeping, an Office of Personnel Management directive that prescribes a system of recordkeeping for Federal

339

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

340

ADMINISTRATIVE RECORDS SCHEDULE 23:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 23: ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES June 2007 Revision 1 This schedule provides for the disposal of certain records common to most offices. It covers administrative subject files; facilitative records such as suspense files, tracking and control records, calendars, and indexes; and documents of transitory value. This schedule does not apply to any materials determined to be non-record or to materials such as calendars or work schedules claimed as personal. Office Administrative Files described under item 1 are records retained by an originating office as its record of initiation of an action, request, or response to requests for information. This item may be applied only to separate administrative files containing such records as copies of

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

Item 65% Cleanup 92% Line Item 69% Cleanup No systems certified in 3rd qtr FY09. 4. PDRI Use: By the end of FY11, 80% of projects (>100M) will use PDRI methodologies no later...

342

Navajo Electrification Demonstraiton Project  

SciTech Connect (OSTI)

This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

Larry Ahasteen, Project Manager

2006-07-17T23:59:59.000Z

343

Blythe-Knob\t161-kV\tTransmission\tLine  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 Blythe-Knob 161-kV Transmission Line Maintenance Project - Continuation Sheet Project Description (continued) The proposed project also includes vegetation management in one...

344

Record of Decision (ROD) | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Record of Decision (ROD) Record of Decision (ROD) Record of Decision (ROD) A concise public document that records a Federal agency's decision(s) concerning a proposed action for which the agency has prepared an environmental impact statement (See CEQ and DOE NEPA regulations at 40 CFR 1505.2 and 10 CFR 1021.315, respectively). If you have any trouble finding a specific document, please contact AskNEPA@hq.doe.gov for assistance. Documents Available for Download January 10, 2014 EIS-0464: Record of Decision Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas December 13, 2013 EIS-0391: Record of Decision Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington October 1, 2013

345

The Bottom Line Space@Penn Upgrade  

E-Print Network [OSTI]

The Bottom Line Space@Penn Upgrade Coming Soon! A project is underway to upgrade the current that allows designated users in the field to update certain elements of their space. This project, whose: Grants & Projects ­ Used for invoice generation, overhead and revenue recognition, and award and project

Sharp, Kim

346

San Luis Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

347

EIS-0198: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Record of Decision 8: Record of Decision EIS-0198: Record of Decision Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project (April 1997) The Department of Energy (DOE) is issuing this Record of Decision regarding its programmatic decision for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project. This decision enables DOE to take action under its UMTRA Ground Water Project, and is based on the environmental analyses in the Final Programmatic Environmental Impact Statement (PEIS) for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198), which DOE issued in December 1996. Record of Decision for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project (April 1997) 62 FR 22913 More Documents & Publications

348

Control of Records  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 Control of Records Process 11_0304 Page 1 of 6 3 Control of Records Process 11_0304 Page 1 of 6 EOTA - Business Process Document Title: Control of Records Process Document Number P-003 Rev 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): REG-003, Records Register P-003 Control of Records Process 11_0304 Page 2 of 6 Revision History: Rev. Description of Change A Initial Release 08_0805 Added Integration Group to Section III. 11_0304 Defined Record Creator and New Record for clarity and swapped Step 3.0 and 4.0 P-003 Control of Records Process 11_0304 Page 3 of 6 I. Purpose To describe the process for how records are established and maintained to provide evidence of conformity to requirements and

349

Record of Decision for the Modification and Construction of Transmission Lines for the U.S. 93 Hoover Dam Bypass Project (DOE/EIS-0352) (10/1/02)  

Broader source: Energy.gov (indexed) [DOE]

9 9 Federal Register / Vol. 67, No. 190 / Tuesday, October 1, 2002 / Notices ''Procedures for Public Participation in Power and Transmission Rate Adjustment,'' has been followed in connection with the proposed rate adjustment. More specifically, opportunities for public review and comment during a 90-day period on the proposed Rayburn power rate were announced by notice published in the Federal Register, May 21, 2002, 67 FR 35805. A Public Information Forum was scheduled to be held June 6, 2002, and a Public Comment Forum was scheduled to be held July 10, 2002, both in Tulsa, Oklahoma. Both forums were canceled as no one expressed an intent to participate. Written comments were due by August 19, 2002. Southwestern provided notice of the Federal Register,

350

EIS-0478: Record of Decision | Department of Energy  

Energy Savers [EERE]

interconnect the Antelope Valley Station to Neset Transmission Project to Western's Williston Substation and Williston to Charlie Creek transmission line. EIS-0478-ROD-2014.pdf...

351

ADMINISTRATIVE RECORDS SCHEDULE 20:  

Broader source: Energy.gov (indexed) [DOE]

20: 20: ELECTRONIC RECORDS April 2008 Revision 2 This schedule authorizes the disposition of specified electronic records and hard-copy or microform records and are integrally related to them. The electronic records may either be created or received. Included are records created by computer operators, programmers, analysts, systems administrators, and all personnel with access to a computer. Disposition authority is provided for certain master files, including some tables that are components of data base management systems, and certain files created from master files for specific purposes. In addition, this schedule covers certain disposable electronic records produced by end users in office automation applications. These disposition authorities apply to the

352

ADMINISTRATIVE RECORDS SCHEDULE 11:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 11: ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS June 2007 Revision 1 This schedule provides for the disposal of all copies, wherever located in the Department, of records relating to space and maintenance, except as indicated below. Records documenting these functions pertain to the acquisition, allocation, utilization, and release of space and include related correspondence and reports submitted to the General Services Administration (or equivalent agency with similar Government-wide responsibilities) as directed by law and regulation (41 CFR 101-17); correspondence and forms relating to the compilation of directory service listings; identification credentials and related accountable records; requests for building and equipment services;

353

Riverside County, California. RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

California. California. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to trench, add approximately 180 feet of conduit and fiber optic cable from the Buck Boulevard SUbstation MEER building east to the fence line. The trenching will be approximately 180 feet, 36 inches deep and 18 inches wide. The disturbed ground will be used for backfill. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes, and bucket trucks to bring personnel and equipment to the work area. The attached map shows the project area location. The legal description is Section 6 Township 6 South, Range 8 East on the San Bernardino Baseline and Meridian (USGS Ripley, California 7.5' maps). It is estimated that the work would be performed between

354

Riverside County, Califomia. RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

Califomia. Califomia. RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Westem proposes to trench, add approximately 180 feet of conduit and fiber optic cable from the Buck Boulevard Substation MEER building east to the fence line. The trenching will be approximately 180 feet, 36 inches deep and 18 inches wide. The disturbed ground will be used for backfill. We will use existing access roads and vehicles such as pickup trucks, crew trucks, backhoes, and bucket trucks to bring personnel and equipment to the work area. The attached map shows the project area location. The legal description is Section 6 Township 6 South, Range 8 East on the San Bemardino Baseline and Meridian (USGS Ripley, Califomia 7.5' maps). It is estimated that the work would be performed between

355

Pinal County, Arizona. ' RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

~ '1 Categorical Exclusion for vegetation removal under existing Saguaro-Tucson 115-kV right-of-way between structures 5/3 thru 6/3 Pinal County, Arizona. ' RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to remove vegetation under its existing Saguaro-Tucson 115-kV transmission line, within Western's existing right-of-way between Structures 5/3 and 6/3 in Pinal County, Arizona. We plan on using existing access roads to the vegetation removal areas. Western will be using a front-end loader with a cutting & shredding attachment to remove the vegetation. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project area on private land situated within Section 25

356

Projectivities and Projective Embeddings  

Science Journals Connector (OSTI)

In this chapter, we aim to prove some of the main achievements in the theory of generalized polygons. First, we want to show what the little projective group and the groups of projectivities of some Moufang po...

Hendrik van Maldeghem

1998-01-01T23:59:59.000Z

357

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

183: Record of Decision 183: Record of Decision EIS-0183: Record of Decision Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project, a 248-megawatt (MW) gas-fired, combined-cycle combustion turbine (CCCT) power generation project (Project), into the Federal Columbia River Transmission System (FCRTS). The Project is located within an industrial area adjacent to TransAlta's existing Centralia Steam Plant in Lewis County, Washington. DOE/EIS-0183, Bonneville Power Administration, Record of Decision for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project (October 2001)

358

EIS-0266: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Record of Decision 6: Record of Decision EIS-0266: Record of Decision Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements The Bonneville Power Administration (BPA) has decided to execute Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project). Initially, BPA will execute one or more PPAs in order to acquire up to the entire Project output. TSAs will be executed before the Project becomes operational. Record of Decision for the Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements, DOE/EIS-0266 (November 2000) More Documents & Publications

359

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

360

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

362

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

363

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

364

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

365

Records Management Exit Procedures  

Broader source: Energy.gov (indexed) [DOE]

Exit Procedures For Departing Federal and contractor Employees PRESERVATION OF FEDERAL RECORDS The Federal Records Act requires the Department of Energy (DOE) Records Officer to remind departing Federal and contractor employees that Federal records may not be removed from Government custody nor may they be destroyed except in accordance with a records disposition schedule that has been approved by the Archivist of the United States. The creation of adequate documentation and the preservation of Federal records are required by law and regulation (contained in 36 CFR Chapter XII). As Federal and contractor employees, you have Federal record-keeping responsibilities that are regulated by the National Archives and Records Administration (NARA) to ensure the retention and

366

Geysers Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Geothermal Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Geysers Project Geothermal Project Project Location Information Coordinates 38.790555555556°, -122.75583333333° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.790555555556,"lon":-122.75583333333,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

367

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

368

ADMINISTRATIVE RECORDS SCHEDULE 22:  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATIVE RECORDS SCHEDULE 22: ADMINISTRATIVE RECORDS SCHEDULE 22: AUDIT/INVESTIGATIVE RECORDS June 2007 Revision 1 Section I of this schedule covers records associated with investigations other than those performed by the Office of the Inspector General (OIG). Types of investigations may include: routine and significant internal program investigations, specific purpose investigations, audits, inspections, appraisals, and management reviews. Investigations may be described or referred to as audits, appraisals, surveillance, self-assessments, management assessments, or evaluations. Investigations may be conducted by DOE or by its contractors. Section II covers records created by the Department's OIG investigations. OIG investigations serve to prevent or reduce waste and fraud in Departmental programs,

369

GNA Cliffs BPA Record of Decision (9/13/02)  

Broader source: Energy.gov (indexed) [DOE]

ADMINISTRATOR'S RECORD OF DECISION ADMINISTRATOR'S RECORD OF DECISION GNA Cliffs Energy Project Record of Decision INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from GNA Energy, LLC, (GNA)-a 300-megawatt (MW) natural-gas-fired, combined- cycle, combustion-turbine power generation project-into the Federal Columbia River Transmission System (FCRTS). This project, the Cliffs Energy Project (CE Project), is 0.5 miles west of the Goldendale Aluminum Company aluminum smelter just off State Route 14 in Klickitat County, Washington. It is one of many proposed generation projects currently being considered for integration into the FCRTS. Power generated at the CE Project will be available for purchase in the wholesale power market.

370

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Windy Gap Firming Project Windy Gap Firming Project Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOE/EIS-0370 (cooperating agency) Western's proposed action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line would be moved outside the area proposed for the reservoir, and Western would ensure the new location would allow the agency to continue to operate and maintain it. Section 2.4.1.4 of the Final Environmental Impact Statement, Volume 1 provides more information on the transmission line relocation proposal. The U.S. Department of the Interior, Bureau of Reclamation is the Lead Agency for the National Environmental Policy Act Review. Cooperating agencies are Western, the U.S. Army Corps of Engineers and Grand County, Colo.

371

EIS-0383: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision Record of Decision EIS-0383: Record of Decision Orlando Gasification Project, Orlando, Orange County, FL Record of Decision for the environmental impact statement (EIS) (DOE/EIS-0383) to assess the environmental impacts associated with a proposed project that would be cost-shared by DOE and Southern Company (in partnership with the Orlando Utilities Commission) (OUC) under DOE's Clean Coal Power Initiative (CCPI) program. Record of Decision for the Orlando Gasification Project, Orlando, Orange County, FL, DOE/EIS-0383 (April 2007) 72 FR 17143 More Documents & Publications EIS-0383: Notice of Intent to Prepare an Environmental Impact Statement EIS-0383: Draft Environmental Impact Statement EIS-0361: Record of Decision and Floodplain Statement of Findings

372

EIS-0383: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0383: Record of Decision EIS-0383: Record of Decision EIS-0383: Record of Decision Orlando Gasification Project, Orlando, Orange County, FL Record of Decision for the environmental impact statement (EIS) (DOE/EIS-0383) to assess the environmental impacts associated with a proposed project that would be cost-shared by DOE and Southern Company (in partnership with the Orlando Utilities Commission) (OUC) under DOE's Clean Coal Power Initiative (CCPI) program. Record of Decision for the Orlando Gasification Project, Orlando, Orange County, FL, DOE/EIS-0383 (April 2007) 72 FR 17143 More Documents & Publications EIS-0383: Notice of Intent to Prepare an Environmental Impact Statement EIS-0383: Draft Environmental Impact Statement EIS-0361: Record of Decision and Floodplain Statement of Findings

373

LM Records Handling System (LMRHS01) - Electronic Records Keeping...  

Energy Savers [EERE]

System (LMRHS01) - Electronic Records Keeping System, Office of Legacy Management, LM Records Handling System (LMRHS01) - Electronic Records Keeping System, Office of Legacy...

374

DOE Hydrogen and Fuel Cells Program Record, Record # 13008: Industry...  

Broader source: Energy.gov (indexed) [DOE]

Record 13008: Industry Deployed Fuel Cell Powered Lift Trucks DOE Hydrogen and Fuel Cells Program Record, Record 13008: Industry Deployed Fuel Cell Powered Lift Trucks...

375

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Broader source: Energy.gov (indexed) [DOE]

3: RECORDS COMMON TO MOST OFFICES (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES (Revision 2) This schedule provides for the disposal of certain...

376

ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS...  

Broader source: Energy.gov (indexed) [DOE]

1: SPACE AND MAINTENANCE RECORDS ADMINISTRATIVE RECORDS SCHEDULE 11: SPACE AND MAINTENANCE RECORDS This schedule provides for the disposal of all copies, wherever located in the...

377

ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES...  

Office of Environmental Management (EM)

23: RECORDS COMMON TO MOST OFFICES ADMINISTRATIVE RECORDS SCHEDULE 23: RECORDS COMMON TO MOST OFFICES This schedule covers those administrative management activities not covered by...

378

Estes-Flatiron Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

379

User_ViewRecords  

Broader source: Energy.gov (indexed) [DOE]

User Records User Records © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Viewing User Records Purpose The purpose of this job aid is to guide users through the step-by-step process of viewing their records. Each task demonstrates viewing of different records. Task A. View To-Do List Enter the web address (URL) of the user application into your browser Address field and press the Enter key. Enter your user ID in the User ID textbox. Enter your password in the Password textbox. Click Sign In. View To-Do List (filter, view) 7 Steps Task A View Completed Work 8 Steps Task B View Curriculum Status and Details 11 Steps Task C 3 3 1 2 2 1 SuccessFactors Learning v 6.4 User Job Aid Viewing User Records

380

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Records Management | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Training, Documents, & Records Records Management The Records Management Program at the Ames Laboratory provides guidance and assistance for administrative departments and...

382

Interpreting Deer Harvest Records.  

E-Print Network [OSTI]

I Texas A&M versity System Agricultural Extension Service Zerle L. Carpenter. Director College Station B-1486 People Helping People Interpreting Deer Harvest Records LIB ARY Dwight f. Guynn* JUN 11 1985 Deer harvest records... are extremely important to proper deer herd man- agement. Because deer are difficult to observe and cannot be handled regularly like livestock, records are one of the few means available to determine deer herd . health, nutrition levels, trends...

Guynn, Dwight E.

1984-01-01T23:59:59.000Z

383

The Scatterometer Climate Record Pathfinder David G. Long Mark Drinkwater Benjamin Holt  

E-Print Network [OSTI]

studies. The NASA Scatterometer Climate Record Pathfinder (SCP) project has generated a unique climate the NASA Scatterometer Climate Record Pathfinder (SCP) project has pro- duced an extensive setThe Scatterometer Climate Record Pathfinder David G. Long Mark Drinkwater Benjamin Holt Brigham

Long, David G.

384

ADMINISTRATIVE RECORDS SCHEDULE 16:  

Broader source: Energy.gov (indexed) [DOE]

2 2 ADMINISTRATIVE RECORDS SCHEDULE 16: ADMINISTRATIVE MANAGEMENT RECORDS June 2007 Revision 1 This schedule covers those administrative management activities not covered by other Administrative Schedules. Included are disposable records created in the course of organizational planning, development, and simplification of procedures; records management activities; and administration of management improvement programs. See ADM 1 (items 12 and 13) for the disposition of case files on individuals involved in incentive award and similar types of management improvement programs. The organizational locations and titles of administrative management units vary. They may be scattered at numerous levels or locations, or may be centralized. For the purposes

385

Records Management Specialist  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a Records Management Specialist in the Richland Operations Office (RL), Assistant Manager for Mission Support (AMMS), Infrastructure, Services...

386

Records Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order sets forth requirements and responsibilities for implementing and maintaining a cost-effective records management program throughout the Department of Energy.

2006-02-03T23:59:59.000Z

387

Records Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order sets forth requirements and responsibilities for establishing and maintaining a program for the efficient and economical management of records and information assets.

2011-07-26T23:59:59.000Z

388

ARM - Written Records  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PastWritten Records Outreach Home Room News Publications Traditional Knowledge Kiosks Barrow, Alaska Tropical Western Pacific Site Tours Contacts Students Study Hall About ARM...

389

Muehrcke's Lines  

Science Journals Connector (OSTI)

Figure 1. A 46-year-old woman with metastatic sarcoma who had been treated with five cycles of doxorubicin, ifosfamide, and mesna chemotherapy presented with two symmetrical, horizontal white lines on all of her fingernails but not on her toenails. A diagnosis of ...

Morrison-Bryant M.; Gradon J.D.

2007-08-30T23:59:59.000Z

390

Beau's Lines  

Science Journals Connector (OSTI)

Figure 1. A 62-year-old woman received six cycles of docetaxel chemotherapy during a six-month period for recurrent metastatic breast cancer. She had completed treatment four weeks before this photograph was taken. Six evenly spaced, transverse lines were noted on ...

Mortimer N.J.; Mills J.

2004-10-21T23:59:59.000Z

391

Project 261  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NOVEL CORROSION SENSOR FOR ADVANCED NOVEL CORROSION SENSOR FOR ADVANCED FOSSIL ENERGY POWER SYSTEMS Description The overall objective of this proposed project is to develop a new technology for on-line corrosion monitoring based on an innovative concept. The specific objectives and corresponding tasks are (1) develop the sensor and electronic measurement system; (2) evaluate and improve the system in a laboratory muffle furnace; and (3) evaluate and improve the system through tests conducted in a pilot-scale coal combustor (~1 MW). Fireside corrosion refers to the metal loss caused by chemical reactions on surfaces exposed to the combustion environment. Such corrosion is the leading mechanism for boiler tube failures and is a serious concern for current and future energy plants due to the introduction of technologies targeting emissions

392

Project 258  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MONITORING POWER PLANT EFFICIENCY USING MONITORING POWER PLANT EFFICIENCY USING THE MICROWAVE-EXCITED PHOTOACOUSTIC EFFECT TO MEASURE UNBURNED CARBON Objective The objective of this project is to explore the use of the microwave-excited photoacoustic (MEPA) effect for quantitative analysis of unburned carbon in fly ash, an extremely important parameter to the electric utility industry. Specific objectives include: * Determine factors that influence accuracy and precision of the MEPA effect; * Evaluate the microwave spectra of fly ash and other divided solids of importance to the power industry; and * Determine the feasibility of an on-line carbon-in-ash monitor based on the MEPA effect. Benefits High carbon levels in coal ash indicate poor combustion efficiency, resulting in additional fuel requirements and higher emissions of pollutants, such as acid-rain

393

Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINA nON  

Broader source: Energy.gov (indexed) [DOE]

danger tree danger tree removal under existing Rogers-Coolidge 230-kV right-of-way between structures 35/4 & 36/2 on the Gila River Indian Reservation Pinal County, Arizona . ' RECORD OF CATEGORICAL EXCLUSION DETERMINA nON A. Proposed Action: Western proposes to cut down 4 Palo Verde trees using hand tools, under our existing Rogers-Coolidge 230-kV transmission line, within Western's existing right-of-way between Structures 35/4 and 36/2 on the Gila River Indian Reservation, Pinal County, Arizona. Western will be using pickup trucks along the existing access road located west of the transmission line to bring personnel and equipment to the work areas. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project area situated within Section 21 of Township 4

394

La Paz and Yuma County Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

maintenance on maintenance on structures 59/3 & 91/3 of the existing Parker-Gila 161-kV transmission line in La Paz and Yuma County Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to conduct maintenance on structures 59/3 & 91/3 of the existing Parker-Gila 161-kV transmission line. This work will consist of replacing bad crossarms. Western will access structures using crew trucks and pickup trucks along existing access roads. This work is necessary to maintain the safety and reliability of the bulk electrical system. The attached map shows the project areas are situated within Sections 34 Township 2 North Range 19 West & Section 11 Township 5 South Range 20 West on the Gila and Salt River Meridian, La Paz & Yuma County, Arizona. Work will be conducted

395

DOE Radiation Records Contacts List  

Broader source: Energy.gov [DOE]

DOE radiation records contact list for individuals to obtain records of occupational exposure directly from a DOE site.

396

ADMINISTRATIVE RECORDS SCHEDULE 14:  

Broader source: Energy.gov (indexed) [DOE]

5 5 ADMINISTRATIVE RECORDS SCHEDULE 14: INFORMATIONAL SERVICES RECORDS June 2007 Revision 1 This schedule covers certain records pertaining to informational services performed by the Department in their day-to-day affairs and in their relations with the public, including records created in administering Freedom of Information Act (FOIA) and Privacy Act ) programs. Except as otherwise specified in individual items, it applies to copies of these records wherever located. Item 4 applies only to files maintained in office responsible for the operation of the information activities. Items 11 through 15 describe the files accumulated in carrying out the provisions of the FOIA, and items 21 through 26 describe the files created in administering the provisions of the Privacy Act. Items 31

397

Project Year Project Team  

E-Print Network [OSTI]

; Ian Sims, Student, Electrical and Computer Engineering, Whiting School of Engineering Project Title and Jazz Theory/Keyboard I & II. Technologies Used Digital Audio, Digital Video, Graphic Design, HTML

Gray, Jeffrey J.

398

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Broader source: Energy.gov (indexed) [DOE]

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland

399

Wildlife Mitigation Program Record of Decision; 06April1997  

Broader source: Energy.gov (indexed) [DOE]

Wildlife Mitigation Program Record of Decision Wildlife Mitigation Program Record of Decision SUMMARY Bonneville Power Administration (BPA) has decided to adopt a set of prescriptions (goals, strategies, and procedural requirements) that apply to future BPA-funded wildlife mitigation projects. Various sourcesincluding Indian tribes, state agencies, property owners, private conservation groups, or other Federal agenciespropose wildlife mitigation projects to the Northwest Power Planning Council (Council) for BPA funding. Following independent scientific and public reviews, Council then selects projects to recommend for BPA funding. BPA adopts this set of prescriptions to standardize the planning and implementation of individual wildlife mitigation projects. This decision is based on consideration of potential environmental

400

EIS-0195: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

: Record of Decision : Record of Decision EIS-0195: Record of Decision Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio The Record of Decision (ROD) for Operable Unit 4 (OU4) at the Fernald Environmental Management Project was signed by the Department of Energy on November 3, 1994, and was approved by the Environmental Protection Agency (EPA) Region V on December 7, 1994, with concurrence of the Ohio Environmental Protection Agency. This decision was made in accordance with the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 U.S.C. 9601 et seq. DOE/EIS-0195, Record of Decision for Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio (January 1995)

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

DOE Administrative Records Schedules Changes | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Administrative Records Schedules Changes DOE Administrative Records Schedules Changes Changes posted to Administrative Records Schedules DOE Administrative Records Schedules...

402

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS...  

Office of Environmental Management (EM)

ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS' ACCOUNTS RECORDS This schedule covers accountable...

403

BEAM LINE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BEAM LINE BEAM LINE 45 W ILHELM ROENTGEN'S INITIAL DISCOVERY of X-radiation in 1895 led immediately to practical applications in medicine. Over the next few decades X rays proved to be an invaluable tool for the investigation of the micro-world of the atom and the development of the quantum theory of matter. Almost a century later, telescopes designed to detect X-radiation are indispensable for understanding the structure and evolution of the macro-world of stars, galaxies, and the Universe as a whole. The X-Ray Universe by WALLACE H. TUCKER X-ray images of the Universe are strikingly different from the usual visible-light images. 46 SUMMER 1995 did not think: I investigated." Undeterred by NASA's rejection of a proposal to search for cosmic X-radiation, Giacconi persuaded the

404

DSW Power Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

405

All-nanoparticle concave diffraction grating fabricated by self-assembly onto magnetically-recorded templates  

Science Journals Connector (OSTI)

Using the enormous magnetic field gradients present near the surface of magnetic recording media, we assemble diffraction gratings with lines consisting entirely of self-assembled...

Ye, L; Terry, B; Mefford, O T; Rinaldi, C; Crawford, T M

2013-01-01T23:59:59.000Z

406

EIS-0183: Revised Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Revised Record of Decision Revised Record of Decision EIS-0183: Revised Record of Decision Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of, the Shepherds Flat Wind Project; Bonneville Power Administration The U.S. Department of Energy announces its decisions to provide a conditional loan guarantee for, and interconnection to the Federal Columbia River Transmission River (FCRTS) of, the 846-megawatt (MW) Shepherds. DOE/EIS-0183, Revised Record of Decision for Offer of Conditional Commitment for a Loan Guarantee for, and Electrical Interconnection of, the Shepherds Flat Wind Project; Bonneville Power Administration, (October 2010) More Documents & Publications EIS-0183: DOE Notice of Availability of the Record of Decision EIS-0183: DOE Notice of Availability of the Record of Decision

407

Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

tor the addition ot bird tor the addition ot bird diversion equipment along the existing Prescott-Pinnacle Peak 230-kV transmission line right-ot-way located in Yavapai County, Arizona . RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes installing Firefly type bird diversion equipment onto static wires (overhead ground wires) of the Prescott-Pinnacle Peak 230-kV transmission line between structures 144/3 and 145/2. The diverters will be spaced approximately 15 ft apart alternating between the two static lines. The diverters will be installed using a hot stick from a helicopter or by accessing the line using existing access roads and rubber-tired vehicles such as cherry pickers, pickup trucks, crew trucks. All work will be done within Westerns existing right-of-way. This

408

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £1.1M Funding Source: Departmental Construction Project Programme: Start on Site: November 2010 End Date : March 2011 Occupation Date: March 2011 For further information contact Project Manager as listed above

409

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5 operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20.imperial.ac.uk/biomedeng Construction Project Team: Project Facts & Figures: Budget: £13,095,963 Funding Source: SRIF II and Capital

410

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

411

Fundamentals of Magnetic Recording  

Science Journals Connector (OSTI)

In recent years magnetic recording has become a preferred medium for storing information such as printed language, mathematics, sound, and pictures. It is compact, economical, easily updated, and instantly ret...

Marvin Camras

1988-01-01T23:59:59.000Z

412

Fundamentals of Stereo Recording  

Science Journals Connector (OSTI)

Stereophonic sound, or stereo as it is usually called, refers generally to any system of recording or sound transmission using multiple microphones and loudspeakers. Signals picked up by the microphones are route...

John M. Eargle

1996-01-01T23:59:59.000Z

413

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0183: Record of Decision EIS-0183: Record of Decision EIS-0183: Record of Decision Electrical Interconnection of the Shepherds Flat Wind Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of up to 846 megawatts (MW) of power to be generated by the proposed Shepherds Flat Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Caithness Shepherds Flat, LLC (CSF) proposes to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's existing Slatt Substation in Gilliam County, Oregon. To provide the interconnection, BPA will expand BPA's existing Slatt Substation to accommodate a 230-kilovolt (kV) yard

414

EIS-0473: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Record of Decision 3: Record of Decision EIS-0473: Record of Decision W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas DOE announces its decision to provide cost-shared funding to NRG Energy, Inc. for the W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (Parish PCCS Project) under DOE's Clean Coal Power Initiative Program. DOE prepared an environmental impact statement to evaluate the potential environmental impacts associated with DOE's proposed action of providing financial assistance for the Parish PCCS Project. DOE has decided to implement the proposed action and will provide limited financial assistance through a cooperative agreement with NRG for the Parish PCCS Project, which will include a new post-combustion carbon dioxide capture

415

1997 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- August 27th, 1997 Pre-Subscription, Post 2001 Contracts - July 24th, 1997 Wyoming Wind Plant Project Power Purchase Agreement - July 21st, 1997 Pacific Northwest...

416

Optical sedimentation recorder  

DOE Patents [OSTI]

A robotic optical sedimentation recorder is described for the recordation of carbon flux in the oceans wherein both POC and PIC particles are captured at the open end of a submersible sampling platform, the captured particles allowed to drift down onto a collection plate where they can be imaged over time. The particles are imaged using three separate light sources, activated in sequence, one source being a back light, a second source being a side light to provide dark field illumination, and a third source comprising a cross polarized light source to illuminate birefringent particles. The recorder in one embodiment is attached to a buoyancy unit which is capable upon command for bringing the sedimentation recorder to a programmed depth below the ocean surface during recordation mode, and on command returning the unit to the ocean surface for transmission of recorded data and receipt of new instructions. The combined unit is provided with its own power source and is designed to operate autonomously in the ocean for extended periods of time.

Bishop, James K.B.

2014-05-06T23:59:59.000Z

417

BLM Approves California Geothermal Development Project | Department...  

Broader source: Energy.gov (indexed) [DOE]

16 new production and injection wells, multiple pipelines, and an electric transmission line. Ormat Nevada Inc. will develop the project on public and private land. When completed,...

418

SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet. SunLine Test Drives Hydrogen Bus:...

419

RECORD OF CATEGORICAL EXCLUSION (CX) DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

RECORD OF CATEGORICAL EXCLUSION (CX) DETERMINATION RECORD OF CATEGORICAL EXCLUSION (CX) DETERMINATION OFFICE: Office of Electricit)' Deliver), and Energy Reliability (OE) PROJECT: OE is initiating the 2012 National Electric Transmission Congestion Study CX BACKGROUND: The National Environmental Policy Act (NEPA) requires federal agencies to prepare Elwironmental Impact Statements (EISs) for evel), recommendation or report on proposals for legislation and other major federal actions significantly affecting the quality of the human envirolllnent. The Department of Energy's (DOE's) regulations that implement NEPA require it to determine whether a proposal (in this case the study of electric transmission congestion and constraints within the Eastern and Western Intercollllections) requires that an EIS, an Envirolllnental

420

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Project Year Project Team  

E-Print Network [OSTI]

information systems (GIS) tools to design maps that integrate data for visualizing geographic concepts School of Engineering Project Title GIS & Introductory Geography Audience Undergraduate students on how to use the Internet for geographic research, and an interactive introduction to GIS through online

Gray, Jeffrey J.

422

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

423

DOE Fuel Cell Technologies Office Record 13013: H2 Delivery Cost...  

Office of Environmental Management (EM)

current, and projected costs for delivering and dispensing hydrogen. DOE Hydrogen and Fuel Cells Program Record 13013 More Documents & Publications Hydrogen Delivery Roadmap US...

424

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Broader source: Energy.gov (indexed) [DOE]

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

425

Salt River Project Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Salt River Project Smart Grid Project Salt River Project Smart Grid Project Jump to: navigation, search Project Lead Salt River Project Country United States Headquarters Location Tempe, Arizona Recovery Act Funding $56,859,359.00 Total Project Value $114,003,719.00 Coverage Area Coverage Map: Salt River Project Smart Grid Project Coordinates 33.414768°, -111.9093095° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

426

RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

vegetation removal betweeen vegetation removal betweeen structures 0/3 and 0/4, liS and 1/6, 3/1 and 3/2, 412 and 4/3, a round structure 418, between structures S/l and S/2 and around structure S/4 along the existing Saguaro -Oracle 11S-kV transmission line, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western proposes to conduct vegetation removal between structures 0/3 and 0/4, 1/5 and 1/6, 3/1 and 3/2, 4/2 and 4/3, around structure 4/8, between structures 5/1 and 5/2 and around structure 5/4 of its Saguaro-Oracle 115- kV transmission line, within Western's existing right-of-way. Western will access the vegetation removal areas using crew trucks along the existing access roads. Western will use a front end loader with a cut shredder attachment to knock down

427

Gila to North Gila Transmission Line Rebuild  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Gila to North Gila Transmission Line Rebuild and Upgrade Project News and updates: On March 21, 2014, Western issued a Finding of No Significant Impact for the proposed action,...

428

DOE Fuel Cell Technologies Program Record, Record # 11003, Fuel...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Fuel Cell Technologies Program Record Record : 11003 Date: March 8, 2011 Title: Fuel Cell Stack Durability Originator: Jacob Spendelow, Dimitrios Papageorgopoulos, and John Garbak...

429

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

430

Social Media Records and You  

Broader source: Energy.gov (indexed) [DOE]

Managing Social Media Records Managing Social Media Records Managing Social Media Records What is Social Media? Your Responsibilities As a DOE federal or contractor Employee your basic records obligations are to: Follow the Lifecycle Records Management Lifecycle Create or receive official records needed to do business Social Media, Web 2.0, and Gov 2 0 bring together technology obligations are to: Planning for the use of Social Media should address records management requirements. Create or Capture records A RECORD is a RECORD is a RECORD, no matter what is used to create or receive it. Ensure that your records are maintained so that they are accessible and easy to retrieve. 2.0 bring together technology, social interaction, and content creation (from USA.gov). DOE uses social media both

431

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

432

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

433

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

434

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Electrical Interconnection of TransAlta Centralia Generation LLC Big Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from the TransAlta Centralia Generation LLC Big Hanaford Project, a 248-megawatt (MW) gas-fired, combined-cycle combustion turbine (CCCT) power generation project (Project), into the Federal Columbia River Transmission System (FCRTS). The Project is located within an industrial area adjacent to TransAlta's existing Centralia Steam Plant in Lewis County, Washington. DOE/EIS-0183, Bonneville Power Administration, Record of Decision for the Electrical Interconnection of TransAlta Centralia Generation LLC Big Hanaford Project (October 2001) More Documents & Publications EIS-0230: Record of Decision

435

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base ...

rroames

2010-01-12T23:59:59.000Z

436

Fundamentals of orifice meter chart recorders  

SciTech Connect (OSTI)

The differential pressure chart recorder used to measure fluid flow through an orifice plate has gone through several design changes since it`s inception some sixty years ago. The present unit on the market uses two fluid filled bellows units connected together. One bellows senses the upstream pressure before the orifice plate, and the other bellows senses the downstream pressure after the orifice plate. This pressure differential created by fluid flow through the orifice plate moves the connected bellows on the back of the chart recorder, which are mechanically linked, by a rotating torque tube through the rear of the case, to the internal case linkage that is connected to an inking pen scribing a line on a circular chart. The ink line on a linear calibrated chart is proportional to the square of the now rate. While the significant information on proper recorder installation will be covered in the classroom. Due to space limitations, this paper will concentrate on a recommended method to precisely calibrate the chart recorder for maximum accuracy of measurement. The basic calibration procedure for the different pressure chart recorder (i.e. set zero, full scale and mid scale) has been taught for years. This paper does not intend to rehash old procedures that are fairly universally known. What this paper does present is a method to achieve a more accurate, more precise calibration than is prescribed in any manufacturer`s literature - and, at the same time, explain why this procedure is more accurate. In addition to being more accurate, this procedure has been proven to be faster than the compromise methods most recorder manufacturers advocate.

Whigham, S.E. [SEWCO Sales & Service, Amarillo, TX (United States)

1995-12-01T23:59:59.000Z

437

EIS-0318: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision Record of Decision EIS-0318: Record of Decision Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Trapp, Clark County, Kentucky DOE has decided that it will provide approximately $60 million in Federal funding support (about 15% of the total cost of approximately $414 million) to design, construct, and demonstrate the commercial scale operation of the integrated gasification combined cycle demonstration project proposed by Kentucky Pioneer Energy. Record of Decision for the Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Trapp, Clark County, Kentucky, DOE/EIS-0318 (February 2003) (68 FR 5628) More Documents & Publications EIS-0318: Final Environmental Impact Statement Fact Sheet: Clean Coal Technology Ushers In New Era in Energy

438

EIS-0318: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

318: Record of Decision 318: Record of Decision EIS-0318: Record of Decision Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Trapp, Clark County, Kentucky DOE has decided that it will provide approximately $60 million in Federal funding support (about 15% of the total cost of approximately $414 million) to design, construct, and demonstrate the commercial scale operation of the integrated gasification combined cycle demonstration project proposed by Kentucky Pioneer Energy. Record of Decision for the Kentucky Pioneer Integrated Gasification Combined Cycle Demonstration Project, Trapp, Clark County, Kentucky, DOE/EIS-0318 (February 2003) (68 FR 5628) More Documents & Publications EIS-0318: Final Environmental Impact Statement Fact Sheet: Clean Coal Technology Ushers In New Era in Energy

439

EIS-0456: Record of Decision and Floodplain Statement of Findings |  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision and Floodplain Statement of Findings Record of Decision and Floodplain Statement of Findings EIS-0456: Record of Decision and Floodplain Statement of Findings Cushman Hydroelectric Project, Mason County, Washington DOE announces its decision to provide approximately $4.6 million appropriated under the American Recovery and Reinvestment Act to the city of Tacoma, Washington for the design and construction of certain components of the Cushman Hydroelectric Project in Mason County, Washington. Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project, Mason County, Washington, Environmental Impact Statement, DOE/EIS-0456 (November 2010) 75 FR 73059 More Documents & Publications EIS-0456: Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact

440

EIS-0397: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Record of Decision 7: Record of Decision EIS-0397: Record of Decision Lyle Falls Fish Passage Project The Bonneville Power Administration (BPA) has decided to fund modifications to the existing Lyle Falls Fishway on the lower Klickitat River in Klickitat County, Washington. In addition to improving fish passage to the upper part of the Klickitat River watershed, This decision implements the Proposed Action and Preferred Alternative identified in the Lyle Falls Fish Passage Project (Lyle Falls) EIS (DOE/EIS-0397, November 2008). Record of Decision for the Lyle Falls Fish Passage Project Final Environmental Impact Statement, EIS-0397 (February 2009) More Documents & Publications EIS-0397: Mitigation Action Plan EIS-0397: Draft Environmental Impact Statement EIS-0397: Final Environmental Impact Statement

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Notice of Availability of Plains & Eastern Clean Line Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242 -...

442

Construction of Central Ferry-Lower Monumental Transmission Line...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

power line capabilities include transmission, overhead and underground distribution and substation projects. BPA also will be holding two "Meet the Builder" open-houses in late...

443

High voltage overhead long transmission line design and fault analysis.  

E-Print Network [OSTI]

??The goal of this project is to design a reliable high voltage overhead long transmission line that satisfies specific design criteria including voltage regulation, efficiency,… (more)

Elzain, Mohamed Ali

2011-01-01T23:59:59.000Z

444

Presentation title: This can be up to 2 lines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

based on National Oceanic and Atmospheric Administration (NOAA) data. Horizontal lines indicate 10-year average over the period Oct. 2004 - Mar. 2014. Projections reflect...

445

Environmental Records.doc  

Broader source: Energy.gov (indexed) [DOE]

TERMS TERMS ALARA as low as reasonably achievable CAA Clean Air Act CEQ Council on Environmental Quality CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CFR Code of Federal Regulations CX categorical exclusion DOE U.S. Department of Energy EA environmental assessment ECL environmental checklist EIS environmental impact statement EPA U.S. Environmental Protection Agency EPCRA Emergency Planning and Community Right-To-Know Act of 1986 FFA&CO Federal Facility Agreement & Consent Order FRC Federal Records Center HEPA high-efficiency particulate air IB information bulletin MSDS material safety data sheet NAAQS National Ambient Air Quality Standards Program NARA National Archives and Records Administration

446

Recording Scientific Knowledge  

SciTech Connect (OSTI)

The way we record knowledge, and the web of technical, formal, and social practices that surrounds it, inevitably affects the knowledge that we record. The ways we hold knowledge about the past - in handwritten manuscripts, in printed books, in file folders, in databases - shape the kind of stories we tell about that past. In this talk, I look at how over the past two hundred years, information technology has affected the nature and production of scientific knowledge. Further, I explore ways in which the emergent new cyberinfrastructure is changing our relationship to scientific practice.

Bowker, Geof (Santa Clara University) [Santa Clara University

2006-01-09T23:59:59.000Z

447

1998 Records of Decision  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3rd, 1998 Execution of Agreements to Install Additional Wind Turbines at the Wyoming Windpower Plant - September 1st, 1998 BPA Lower Valley Transmission Project - August 4th, 1998...

448

Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the  

Broader source: Energy.gov (indexed) [DOE]

Deputy Secretary Poneman to Clean Line Energy Regarding Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) More Documents & Publications Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of

449

EIS-0354: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision Record of Decision EIS-0354: Record of Decision Western Area Power Administration Valley Electric Association Interconnection of Ivanpah Energy Center to Mead Substation The Department of the Interior, Bureau of Land Management (BLM), prepared an Environmental Impact Statement (EIS) evaluating the construction, operation and maintenance of the Ivanpah Energy Center (IEC) power plant and ancillary facilities. The project would provide 500 megawatts (MW) of baseload power to the southern Nevada power grid. Record of Decision for Western Area Power Administration Valley Electric Association Interconnection of Ivanpah Energy Center to Mead Substation (DOE/EIS-0354) 68 FR 66410 (November 2003) More Documents & Publications EIS-0354: Final Environmental Impact Statement

450

EIS-0455: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

55: Record of Decision 55: Record of Decision EIS-0455: Record of Decision Genesis Solar Energy Project, Riverside County, CA The U.S. Department of Energy announces its decision to issue a loan guarantee under Title XVII of the Energy Policy Act of 2005 (EPAct 2005) to Genesis Solar, LLC, for construction and startup of the Genesis Solar Energy Project (GSEP), a 250-megawatt (MW) nominal capacity solar power generating facility on approximately 1,950 acres, all of which is administered by the U.S. Department of the Interior, Bureau of Land Management (BLM), in Riverside County, California. The environmental impacts of constructing and operating this project were analyzed pursuant to the National Environmental Policy Act (NEPA) in Plan Amendment/Final Environmental Impact Statement for the Genesis Solar Energy Project,

451

EIS-0454: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision Record of Decision EIS-0454: Record of Decision Tonopah Solar Energy, LLC, Crescent Dunes Solar Energy Project (September 2011) For more information, contact: Ms. Angela Colamaria, DOE NEPA Document Manager Environmental Compliance Division Loan Programs Office (LP-10) U.S. Department of Energy 1000 Independence Avenue, SW. Washington, DC 20585 Telephone: 202-287-5387 Electronic mail: Angela.Colamaria@hq.doe.gov DOE announces its decision to issue a Federal loan guarantee under Title XVII of the Energy Policy Act of 2005 (EPAct 05), as amended by Section 406 of the American Recovery and Reinvestment Act of 2009 (Recovery Act), to Tonopah Solar Energy, LLC (TSE), for construction and start-up of the Crescent Dunes Solar Energy Project (the Project). The Project is a proposed 110-megawatt solar power generating facility

452

EIS-0455: Record of Decision | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5: Record of Decision 5: Record of Decision EIS-0455: Record of Decision Genesis Solar Energy Project, Riverside County, CA The U.S. Department of Energy announces its decision to issue a loan guarantee under Title XVII of the Energy Policy Act of 2005 (EPAct 2005) to Genesis Solar, LLC, for construction and startup of the Genesis Solar Energy Project (GSEP), a 250-megawatt (MW) nominal capacity solar power generating facility on approximately 1,950 acres, all of which is administered by the U.S. Department of the Interior, Bureau of Land Management (BLM), in Riverside County, California. The environmental impacts of constructing and operating this project were analyzed pursuant to the National Environmental Policy Act (NEPA) in Plan Amendment/Final Environmental Impact Statement for the Genesis Solar Energy Project,

453

EIS-0464: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Record of Decision Record of Decision EIS-0464: Record of Decision DOE announces its decision to provide cost-shared funding to Leucadia Energy, LLC (Leucadia) for its Lake Charles Carbon Capture and Sequestration project (Lake Charles CCS project) under DOE's Industrial Carbon Capture Sequestration Program. DOE prepared an environmental impact statement (EIS) to evaluate the potential environmental impacts associated with DOE's proposed action of providing financial assistance to the Lake Charles CCS project. The EIS evaluated the impacts associated with construction and operation of the proposed project and Leucadia's Gasification Plant, which is a connected action. DOE's proposed action is to provide financial assistance through a cooperative agreement with Leucadia to capture carbon dioxide (CO2) from the Gasification Plant and

454

EIS-0224: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Record of Decision 4: Record of Decision EIS-0224: Record of Decision Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project The document was also prepared to comply with the California Environmental Quality Act, hence the impacts; the proposed project will be beneficial to the public by extending the life of the Southeast Geysers Geothermal Field providing more electricity for consumption, and the proposed project will be beneficial to the public by bringing the Southeast Regional Wastewater Treatment Plant into compliance with California Regional Water Quality Control Board Waste Discharge Requirements and enable lifting of the Board's 1991 Cease and Desist Order and associated moratorium. The final Environmental Impact Statement was published August 25, 1994.

455

EIS-0444: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Record of Decision 4: Record of Decision EIS-0444: Record of Decision Texas Clean Energy Project, Ector County, Texas (September 2011) For more information, contact: Mr. Mark L. McKoy, Environmental Manager U.S. Department of Energy National Energy Technology Laboratory P.O. Box 880 Morgantown, WV 26507-0880 Telephone: 304-285-4426 Toll-free number: 1-800-432-8330 (ext. 4426) DOE announces its decision to continue to provide financial support to the Texas Clean Energy Project (TCEP). DOE prepared an Environmental Impact Statement (DOE/EIS-0444) to assess the environmental impacts associated with the TCEP, a project that Summit Texas Clean Energy, LLC would design, construct, and operate. The project will demonstrate advanced power systems using integrated gasification combined-cycle

456

Project Title: VIscosity Reduction Date:  

Broader source: Energy.gov (indexed) [DOE]

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

457

Records Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To set forth requirements and responsibilities for making and preserving records containing adequate and proper documentation of the organization, functions, policies, decisions, procedures, and essential transactions of the [Department of Energy (DOE)] and designed to furnish the information necessary to protect the legal and financial rights of the Government and persons directly affected by [DOE] activities.

2011-11-07T23:59:59.000Z

458

Records Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order sets forth requirements and responsibilities for creating and preserving records of DOE organization, functions, policies, decisions, procedures, and essential transactions and information necessary to protect the legal and financial rights of the Government and persons directly affected by DOE activities. Cancels DOE O 243.1A and DOE O 243.2. Adm Chg 1, 7-8-13.

2013-03-11T23:59:59.000Z

459

Canby Cascaded Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Canby Cascaded Project Geothermal Project Canby Cascaded Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Canby Cascaded Project Geothermal Project Project Location Information Coordinates 41.443888888889°, -120.87027777778° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.443888888889,"lon":-120.87027777778,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

460

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

existing Tower Road-Alkali 115-kilovolt (kV) transmission line in Gilliam County, Oregon. BPA will construct a tap to allow the Wind Project to interconnect to BPA's transmission...

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

NEPA COMPLIANCE SURVEY J.-1{p Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

}:- }:- J.-1{p Project Information Project Title: Flowline leak @ 68-66-SX-34 Date: 1/26/2010 DOE Code: Contractor Code: Project Lead: Jeff Jones Project Overview 011..- 1. What are the environmental Elimination of the flowline@ 68-66- SX-34. Dig up and locate leak. Take p ntaminated soil to land fann and impacts? record in log book. The duration of this project will be approx. 4-days. The equipment to be used is as follows backhoe, and welder. We will be eliminating the flowline and pumping to a tank set on location.So we don't 2. What is the legal location? have any leaks in the Mure. 3. What is the duration of the project? 4. What major equipment will be used if any (work over rig, drilling rig, etc.)? The table below Is to be completed by the Project Lead and nwlewed by the Environmental Specialist and the DOE NEPA

462

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

463

EIS-0183: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

GNA Cliffs Energy Project GNA Cliffs Energy Project The Bonneville Power Administration (BPA) has decided to offer contract terms for integrating power from GNA Energy, LLC, (GNA)-a 300-megawatt (MW) natural-gas-fired, combined- cycle, combustion-turbine power generation project-into the Federal Columbia River Transmission System (FCRTS). This project, the Cliffs Energy Project (CE Project), is 0.5 miles west of the Goldendale Aluminum Company aluminum smelter just off State Route 14 in Klickitat County, Washington. It is one of many proposed generation projects currently being considered for integration into the FCRTS. Power generated at the CE Project will be available for purchase in the wholesale power market. DOE/EIS-0183, Administrator's Record of Decision, Bonneville Power

464

EIS-0236: Record of Decision  

Broader source: Energy.gov [DOE]

Record of Decision Programmatic Environmental Impact Statement for Stockpile Stewardship and Management

465

Roadmap to the Project: DOE Roadmap  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Experiments List Experiments List Oral Histories Records Series Descriptions Overview Documents Declassified Documents Project Events ACHRE Report Uranium Miners Resources Building Public Trust Department of Defense Report HUMAN RADIATION EXPERIMENTS: The Department of Energy Roadmap to the Story and the Records United States Department of Energy Assistant Secretary for Environment, Safety, and Health February 1995 Contents Foreword Acknowledgments List of Photographs Chapter 1. Overview of the DOE Project Introduction Background DOE Archives and Records DOE Strategy for Finding Experiment Information Information as an Engine for Democratic Government Looking Forward Chapter 2. Narratives and Records Series Descriptions Introduction DOE Predecessor Agencies and Human Radiation Experimentsation: A Headquarters Overview

466

Records Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Management Records Management The Department of Energy (DOE) Records Management Program ensures compliance with the Federal Records Act of 1950, as amended, by promoting the management of records throughout their life cycle in an economical, efficient and effective manner. Implementation of a sound Records Management Program facilitates decision-makers and others having the right information in support of mission accomplishment; and the creation and maintenance of records to protect the rights and interests of the Department and those we serve. The Records Management Program is also responsible for the Department's Information Collection Program, and the Information Quality Program. The Information Collection Program is responsible for implementing the

467

Records Management | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management Management Records Management The Department of Energy (DOE) Records Management Program ensures compliance with the Federal Records Act of 1950, as amended, by promoting the management of records throughout their life cycle in an economical, efficient and effective manner. Implementation of a sound Records Management Program facilitates decision-makers and others having the right information in support of mission accomplishment; and the creation and maintenance of records to protect the rights and interests of the Department and those we serve. The Records Management Program is also responsible for the Department's Information Collection Program, and the Information Quality Program. The Information Collection Program is responsible for implementing the

468

U.S. Department of Energy Project Review Guide for Capital Asset Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide addresses the various project reviews conducted during the life-cycle of a project based on the stage, complexity and duration of a project. This Guide describes typical reviews, the purpose of each, the timing during the project life-cycle, lines of inquiry, and required documentation. No cancellations.

2008-09-23T23:59:59.000Z

469

Information and Records Management Transition Guidance | Department...  

Energy Savers [EERE]

Information and Records Management Transition Guidance Information and Records Management Transition Guidance Information and Records Management Transition Guidance (March 2004)...

470

ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION...  

Broader source: Energy.gov (indexed) [DOE]

5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS ADMINISTRATIVE RECORDS SCHEDULE 5: BUDGET PREPARATION, PRESENTATION, AND APPORTIONMENT RECORDS Budget and...

471

Accountable Officers' Accounts Records | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Accountable Officers' Accounts Records Accountable Officers' Accounts Records ADM 60.pdf More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 6: ACCOUNTABLE OFFICERS'...

472

Request For Records Disposition | Department of Energy  

Office of Environmental Management (EM)

Request For Records Disposition Request For Records Disposition Southeastern Power Administration (SEPA) Request For Records Disposition More Documents & Publications Audit...

473

Method of migrating seismic records  

DOE Patents [OSTI]

The present invention provides a method of migrating seismic records that retains the information in the seismic records and allows migration with significant reductions in computing cost. The present invention comprises phase encoding seismic records and combining the encoded seismic records before migration. Phase encoding can minimize the effect of unwanted cross terms while still allowing significant reductions in the cost to migrate a number of seismic records.

Ober, Curtis C. (Las Lunas, NM); Romero, Louis A. (Albuquerque, NM); Ghiglia, Dennis C. (Longmont, CO)

2000-01-01T23:59:59.000Z

474

Records Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order sets forth requirements and responsibilities for creating and preserving records of DOE organization, functions, policies, decisions, procedures and essential transactions and information necessary to protect the legal and financial rights of the Government and persons directly affected by DOE activities. Cancels DOE O 243.1A and DOE O 243.2. Admin Chg 1, dated 7-8-13, cancels DOE O 243.1B.

2013-03-11T23:59:59.000Z

475

RS-WEAPONS Records  

Broader source: Energy.gov (indexed) [DOE]

~ ~ o c tnstructions o n r e v e r s e ) ' T O NATIONAL ARCHIVES and RECORDS ADMINISTRATION (NIR) \$'ASHINGTON. DC 20108 ' 1 FROM (Agency or establishment) U. S . De~artment of E ~ r n v 2 MAJOR SUBDIVISION 3 MINOR SUBDlVlSlOtJ I hereby certify that I am authorized to act for this agency in matters pertaining to the disposition of its records and that the records roposed for disposal on the attached 38 page(s) are not noJv needed for the business of t h ~ s agency or wi f not be needed after the retention erlods s ecified; and that wrritten concurrence from ,4eencies, P P the General A c c o u ~ t ~ n g Offlce, u n d e r the p r o v ~ s i o n s o Title 8 o the G A O M a n u a l for Guidance of Federal L t A V E BLANK (NARA use only) 'JOB NUMBER h / / - 4 3 C t ~ 7 6 -- 3 - DATE Z - 2 3 - 7 6 NOTIFICATIONTO AGENCY

476

Records Schedule-UMTRA  

Broader source: Energy.gov (indexed) [DOE]

WEQh!?ST FOP. RECOhD WEQh!?ST FOP. RECOhD ' 3ISPOSITIQN AClT H O R l N - - . (See Insrru~t,ons on reverse) 'c NATIOKAL ARCMVES and RECORDS ADMINISTRATION (MR) WASHINGTON, DC 20408 I . FROM ( A g e n c y or e s t a b l ~ s h m e n t ) , U. S . Denar-merit o f Enercy 2. MAJOR SU8OlVlSiON i 51 bu~uerque $net a t i i o n s O f ?ice (kL9 j 3. MINOR SUBDIVISION Urani urn !records and that the records roposed for disposal on the attached L , page s) are not now needed for the bus~ness of this agency or wil f not be needed after the retention enodss eci A ed; and that written concurrence from the General Accounting Office, under the pmvisions o

477

Records Schedule Contractor Checks  

Broader source: Energy.gov (indexed) [DOE]

REQUEST FOR RECORDS DlSPOSlTlON AWTHORlW I REQUEST FOR RECORDS DlSPOSlTlON AWTHORlW I ' O B N ~ U R ~ ~ ( 5 0 s I n s rrucrigns on r e v r r r m ) , .- , ' 1 0 NATIOXAL ARCHIVES and RECORDS ADMWIS?IWTION WR) lp"TE ~~~~k~ f . WASHINGTON. l X 20408 21- , f - $+$ [ r . F R O M (Agenc y o r w t l a b l ~ g h m ~ n l ) - Washington, DC 20585 Department of Energy -- -2, M ~ O R S U B D ~ V I S ~ O N . ' 3 MINOR SL)BDWISION 6 AGENCY CERTIFICATION I hereby ccnity that I am authorized to act for thir and that the rrcords roposed for dfsposal on of thir agency or vilrnor be needed after the the General Accounting Office, under the provisions Q Manual for Guidance of Federal Agencies, is nor required; a is attached; or hhu been rrqucrtcd. m u . Team Leader, Recards Mgt. '4, NAME OF P E R S O N wIm WHOM To CONFER .5. E L W H O N L A Mary AM Wallace . --..-*- -

478

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Broader source: Energy.gov (indexed) [DOE]

9: TRAVEL AND TRANSPORTATION RECORDS ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS This schedule covers records documenting the movement of goods and persons...

479

ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION...  

Energy Savers [EERE]

9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) ADMINISTRATIVE RECORDS SCHEDULE 9: TRAVEL AND TRANSPORTATION RECORDS (Revision 2) This schedule covers records documenting the...

480

Records Management POC Responsibilities | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

POINT OF CONTACT RESPONSIBILITIES FOR RECORDS MANAGEMENT Records Management Procedures for Storage, Transfer and Retrieval of Records from WNRC Records Management Handbook...

Note: This page contains sample records for the topic "line project record" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Webinar: Wind-to-Hydrogen Cost Modeling and Project Findings  

Broader source: Energy.gov [DOE]

Video recording and text version of the webinar titled, Wind-to-Hydrogen Cost Modeling and Project Findings, originally presented on January 17, 2013.

482

EIS-0230: DOE Notice of Availability of the Record of Decision | Department  

Broader source: Energy.gov (indexed) [DOE]

0: DOE Notice of Availability of the Record of Decision 0: DOE Notice of Availability of the Record of Decision EIS-0230: DOE Notice of Availability of the Record of Decision Electrical Interconnection of the Satsop Combustion Turbine Project This notice announces the availability of the ROD to offer contract terms to integrate power from the Satsop Combustion Turbine Project, a 650-megawatt gas-fired, combined-cycle, combustion turbine power generation project, into the Federal Columbia River Transmission System (FCRTS). DOE/EIS-0230, Notice of Availability of the Record of Decision for the Electrical Interconnection of the Satsop Combustion Turbine Project, 67 FR 30905 (May 2002) More Documents & Publications EIS-0230: Record of Decision EIS-0183: Record of Decision EIS-0230: Final Environmental Statement

483

Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters  

E-Print Network [OSTI]

, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

484

EIS-0308: Record of Decision and Floodplain Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

8: Record of Decision and Floodplain Statement 8: Record of Decision and Floodplain Statement EIS-0308: Record of Decision and Floodplain Statement Interconnection of the Southpoint Power Plant with the Wester Area Power Administration's Parker-Davis No. 1 and No. 2, 230-kilovolt Transmission Lines Western has determined that no significant environmental impacts will result from construction, operation and maintenance of Calpine Corporation's Southpoint Power Plant, the two natural gas pipelines, or the approximately 7 miles of high voltage transmission lines, or from the upgrade of the Parker-Davis No. 1 230-kilovolt (kV) transmission line. Therefore, Western has decided to provide an interconnection with the plant and Western's transmission system in west central Arizona. However, Calpine has yet to obtain a permit from the Bureau of Land Management (BLM)

485

Vineyard Energy Project Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Vineyard Energy Project Country United States Headquarters Location West Tisbury, Massachusetts Recovery Act Funding $787,250.00 Total Project Value $1,574,500.00 Coverage Area Coverage Map: Vineyard Energy Project Smart Grid Project Coordinates 41.3812245°, -70.6744723° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

486

Pecan Street Project, Inc. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Project, Inc. Smart Grid Demonstration Project Project, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead Pecan Street Project, Inc. Country United States Headquarters Location Austin, Texas Recovery Act Funding $10,403,570.00 Total Project Value $24,656,485.00 Coordinates 30.267153°, -97.7430608° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

487

EIS-0183: Notice of Availability of the Revised Record of Decision |  

Broader source: Energy.gov (indexed) [DOE]

Revised Record of Decision Revised Record of Decision EIS-0183: Notice of Availability of the Revised Record of Decision Bonneville Power Administration, Summit/Westward Project This notice announces the availability of the Revised ROD to offer contract terms for an optional electrical interconnection of the proposed Summit/Westward Project into the Federal Columbia River Transmission System at a point near the existing Wauna Substation of the Clatskanie People's Utility District (CPUD), Columbia County, Oregon. EIS-0183; Notice of Availability of the Revised Record of Decision for the Bonneville Power Administration, Summit/Westward Project (October 2004) More Documents & Publications EIS-0183: Revised Record of Decision EIS-0183: Record of Decision EIS-0349: DOE Notice of Availability of the Record of Decision

488

Science Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

489

Projection Systems  

Science Journals Connector (OSTI)

As a general rule, broad-band sources which employ projection optics are the most difficult to evaluate. In addition to the problems encountered in evaluating exposed lamps, one must characterize the projected...

David Sliney; Myron Wolbarsht

1980-01-01T23:59:59.000Z

490

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied ...

491

Hydropower Projects  

Broader source: Energy.gov [DOE]

This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

492

SunZia Southwest Transmission Project Comments  

Broader source: Energy.gov (indexed) [DOE]

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

493

Watershed Management Program Record of Decision; 28Aug1997  

Broader source: Energy.gov (indexed) [DOE]

Watershed Management Program Watershed Management Program Record of Decision SUMMARY Bonneville Power Administration (BPA) has decided to adopt a set of prescriptions (goals, strategies, and procedural requirements) that apply to future BPA-funded watershed management projects. Various sources-including Indian tribes, state agencies, property owners, private conservation groups, or other Federal agencies-propose watershed management projects to the Northwest Power Planning Council (Council) for BPA funding. Following independent scientific and public reviews, the Council then selects projects to recommend for BPA funding. BPA adopts this set of prescriptions to standardize the planning and implementation of individual watershed management programs and projects. This decision is based on consideration of

494

Florence & Oracle Junction, Pinal County, AZ, RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

emergency wood pole emergency wood pole replacement at 59 structures located along the Coolidge-Oracle 115-kV T.L. , near Cooiidge, Florence & Oracle Junction, Pinal County, AZ, RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to replace deteriorated wood poles, cross arms and X-braces at 59 existing H-frame or 3-pole-turning structures (Table 1) located along the Coolidge-Oracle 115-kV Transmission Line in Pinal County, Arizona (Figure 1), Built in 1943, its aging components are beyond repair and require replacement. These poles performed poorly during structural tests, and we consider them unstable, This project ensures the safety of Western's workers and the public as well as reliability of the bulk electric system, Western will accomplish the work by clearing vegetation and blading a level pad at

495

Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION  

Broader source: Energy.gov (indexed) [DOE]

for Bouse Substation Expansion and Upgrade, Parker Annex, La Paz County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western has requested that APS relocate an existing 69kV transmission line. This will consist of replacing existing conductor and 69-kV Gang Operated Switch and installing 6 new steel monopole structures, an above ground primary meter and underground cable from the 3 phase transition. The project is located in La Paz County, Arizona. The legal description is Section 27 & 34 Township 8 North, Range 19 West on the Gila and Salt River Baseline and Meridian (USGS Black Peak & Bouse NW, AZ 7.5' maps). Western owns the land. This work is planned to begin the month of September 2011 and be completed by

496

PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS  

Broader source: Energy.gov (indexed) [DOE]

* PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM ROCKY FLATS ENVIRONMENTAL RECORDS DATABASE PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element & Site June 4,2009 Office of Legacy Management, Morgantown, WV Name of Information LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records System or IT Project Database exhibit Project UID 019-10-01-31-02-1014-00

497

EIS-0407: Record of Decision | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

: Record of Decision : Record of Decision EIS-0407: Record of Decision Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas The U.S. Department of Energy (DOE or the Department) prepared an environmental impact statement (EIS) (DOE/EIS-0407) to assess the potential environmental impacts associated with the proposed action of providing Federal financial assistance to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton in Stevens County, southwestern Kansas. Record of Decision for the Environmental Impact Statement for the Proposed Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas, DOE/EIS-0407 (January 2011) 76 FR 2096

498

DOE Hydrogen Program Record 10004, Fuel Cell System Cost - 2010  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Record Program Record Record #: 10004 Date: September 16, 2010 Title: Fuel Cell System Cost - 2010 Update to: Record 9012 Originator: Jacob Spendelow and Jason Marcinkoski Approved by: Sunita Satyapal Date: December 16, 2010 Item: The cost of an 80-kW net automotive polymer electrolyte membrane (PEM) fuel cell system based on 2010 technology and operating on direct hydrogen is projected to be $51/kW when manufactured at a volume of 500,000 units/year. Rationale: In fiscal year 2010, TIAX LLC (TIAX) and Directed Technologies, Inc. (DTI) each updated their 2009 cost analyses of 80-kW net direct hydrogen PEM automotive fuel cell systems based on 2010 technology and projected to manufacturing volumes of 500,000 units per year [1,2]. Both cost estimates are based on performance at beginning of life.

499

PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS  

Broader source: Energy.gov (indexed) [DOE]

,. - -i * PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM: FERNALD HISTORICAL RECORDS SYSTEM PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/02061.pdf Please complete electronically: no hand-written slibmisslons will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element & SIte· June 4, 2009 Office of Legacy Management, Morgantown, WV Name of Information System or IT Project LM Records Handling System (LMRHS01) - Fernald Historical Records System exhIbit Project UIO 019-10-01-31-02-1014-00

500

RECORD OF CATEGORICAL EXCLUSION DETERMINATION Project ID No. PR-10084713  

Broader source: Energy.gov (indexed) [DOE]

PR-10084713 PR-10084713 Title: Purchase of BH Control Valve Assembly Description: Vendor shall supply and deliver one 16-inch, 600# Control Valve Assembly to the Big Hill SPR site. Regulatory Requirements: NEPA Implementing Procedures (10 CFR 1021) 10 CFR 1021.410 (Application of Categorical Exclusions) (a) The actions listed in Appendices A and B of Subpart D are classes of actions that DOE has determined do not individually or cumulatively have a significant effect on the human environment (categorical exclusions). (b) To find that a proposal is categorically excluded, DOE shall determine the following: (1) The proposed action fits within a class of actions that is listed in Appendix A or B of Subpart D; (2) There are no extraordinary circumstances related to the proposal that may affect the