  1. Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-02-08T23:59:59.000Z

    This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

  2. Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-01-10T23:59:59.000Z

    Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

  3. Draft Advanced Nuclear Energy Projects Solicitation | Department...

    Broader source: Energy.gov (indexed) [DOE]

    Federal loan guarantee solicitation announcement -- Advanced Nuclear Energy Projects. Draft Advanced Nuclear Energy Projects Solicitation More Documents & Publications Draft...

  4. Panel 2, Renewable Energy & Energy Efficiency Projects: Draft...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the last 30 years: Vogtle LPO Has Financed Deployment of Groundbreaking Projects 4 Draft Renewable Energy & Efficient Energy Projects Solicitation 5 Draft Solicitation Can Provide...

  5. EIS-0486: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    Availability of Draft Environmental Impact Statement EIS-0486: EPA Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project...

  6. EIS-0414: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Draft Environmental Impact Statement EIS-0414: EPA Notice of Availability of the Draft Environmental Impact Statement Energia Sierra Juarez U.S. Transmission Line Project,...

  7. Energy Research and Development Division DRAFT PROJECT REPORT

    E-Print Network [OSTI]

    Use Energy Efficiency · Renewable Energy Technologies · Transportation Natural Gas Energy Efficiency Energy Research and Development Division DRAFT PROJECT REPORT NATURAL GAS ENERGY EFFICIENCY in Buildings ­ Roadmap for Future Research is the final report for the Buildings Natural Gas Roadmap

  8. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  9. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-05-01T23:59:59.000Z

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  10. BP Cherry Point Cogeneration Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-09-19T23:59:59.000Z

    BP West Coast Products, LLC (BP or the Applicant) proposes to construct and operate a nominal 720-megawatt (MW), natural-gas-fired, combined-cycle cogeneration facility next to the existing BP Cherry Point Refinery in Whatcom County, Washington. The Applicant also owns and operates the refinery, but the cogeneration facility and the refinery would be operated as separate business units. The cogeneration facility and its ancillary infrastructure would provide steam and 85 MW of electricity to meet the operating needs of the refinery and 635 MW of electrical power for local and regional consumption. The proposed cogeneration facility would be located between Ferndale and Blaine in northwestern Whatcom County, Washington. The Canadian border is approximately 8 miles north of the proposed project site. The Washington State Energy Facility Site Evaluation Council (EFSEC) has jurisdiction over the evaluation of major energy facilities including the proposed project. As such, EFSEC will recommend approval or denial of the proposed cogeneration facility to the governor of Washington after an environmental review. On June 3, 2002, the Applicant filed an Application for Site Certification (ASC No. 2002-01) with EFSEC in accordance with Washington Administrative Code (WAC) 463-42. On April 22, 2003, the Applicant submitted an amended ASC that included, among other things, a change from air to water cooling. With the submission of the ASC and in accordance with the State Environmental Policy Act (SEPA) (WAC 463-47), EFSEC is evaluating the siting of the proposed project and conducting an environmental review with this Environmental Impact Statement (EIS). Because the proposed project requires federal agency approvals and permits, this EIS is intended to meet the requirements under both SEPA and the National Environmental Policy Act (NEPA). The Bonneville Power Administration (Bonneville) and U.S. Army Corps of Engineers (Corps) also will use this EIS as part of their respective decision-making processes associated with the Applicant's request to interconnect to Bonneville's transmission system and proposed location of the project within wetland areas. Therefore, this Draft EIS serves as the environmental review document for SEPA and for NEPA as required by Bonneville for the interconnection and the Corps for its 404 individual permit. The EIS addresses direct, indirect, and cumulative impacts of the proposed project, and potential mitigation measures proposed by the Applicant, as well as measures recommended by EFSEC. The information and resulting analysis presented in this Draft EIS are based primarily on information provided by the Applicant in the ASC No. 2002-01 (BP 2002). Where additional information was used to evaluate the potential impacts associated with the proposed action, that information has been referenced. EFSEC's environmental consultant, Shapiro and Associates, Inc., did not perform additional studies during the preparation of this Draft EIS.

  11. Draft of Preliminary Syllabus Applying Geospatial Analysis-Project Based Learning

    E-Print Network [OSTI]

    Fabrikant, Sara Irina

    Draft of Preliminary Syllabus Applying Geospatial Analysis- Project Based Learning Listed as, and analysis (2) formulate and evaluate research questions relating to geospatial approaches (3) learn geospatial techniques (4) learn data management, data conversion, and data analysis (5) apply geospatial

  12. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    capital asset line item projects (less than 50 million) are fully funded in one Fiscal Year (one Appropriation). NA NA Policy memorandum drafted and in review 12. Cost...

  13. Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-08-27T23:59:59.000Z

    Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

  14. Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-01-01T23:59:59.000Z

    BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

  15. Final Map Draft Comparison Report WIND ENERGY RESOURCE MODELING AND MEASUREMENT PROJECT

    E-Print Network [OSTI]

    SOLUTIONS, LLC (now AWS Truewind LLC) 255 FULLER ROAD, SUITE 274 ALBANY, NEW YORK Michael Brower PrincipalII Final Map Draft Comparison Report #12;WIND ENERGY RESOURCE MODELING AND MEASUREMENT PROJECT Tel: 978-749-9591 Fax: 978-749-9713 mbrower@awstruewind.com August 10, 2004 #12;2 WIND ENERGY RESOURCE

  16. EIS-0447: Champlain Hudson Power Express Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    47: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluated the...

  17. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Environmental Management (EM)

    880: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with...

  18. Draft Renewable Energy and Efficient Energy Projects Solicitation Fact

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3:CPublicDepartment

  19. I-5 Corridor Reinforcement Project Draft EIS Public Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh School footballHydrogen andHypernuclei in Hall C High2 - _UpdatesDraft

  20. BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-04-01T23:59:59.000Z

    BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

  1. Draft Area Recommendation Report for the Crystalline Repository Project: Overview. [Second repository

    SciTech Connect (OSTI)

    none,

    1986-01-01T23:59:59.000Z

    The draft Area Recommendation Report (ARR) for the Crystalline Repository Project identifies portions of crystalline rock bodies as proposed potentially acceptable sites for the Nation's second repository for deep geologic burial of high-level radioactive waste and spent nuclear fuel. This Overview provides a brief summary of that report. The US Department of Energy (DOE) evaluated available geologic and environmental data for 235 crystalline rock bodies in the North Central, Northeastern, and Southeastern Regions to identify preliminary candidate areas. The 12 proposed potentially acceptable sites are located in the States of Georgia (1), Maine (2), Minnesota (3), New Hampshire (1), North Carolina (2), Virginia (2), and Wisconsin (1). The data, analyses and rationale pertaining to the identification of the 12 proposed potentially acceptable sites are presented in the draft ARR. The analyses presented in the draft ARR demonstrate that the evidence available for each proposed potentially acceptable site supports (1) a finding that the site is not disqualified under Appendix III of the DOE Siting Guidelines and (2) a decision to proceed with the continued investigation of the site on the basis of the favorable and potentially adverse conditions identified to date. These potentially acceptable sites will be investigated and evaluated in more detail during the area phase of the siting process and considered along with other candidate sites in a progressive narrowing process to finally choose the site of the second repository in 1998.

  2. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    SciTech Connect (OSTI)

    None

    1992-03-01T23:59:59.000Z

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  3. Draft West Valley Demonstration Project Waste Management Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-05-16T23:59:59.000Z

    As part of its ongoing West Valley Demonstration Project (WVDP), and in accordance with the West Valley Demonstration Project Act and previous U.S. Department of Energy (DOE or the Department) decisions, DOE proposes to: (1) Continue onsite management of high-level radioactive waste (HLW) until it can be shipped for disposal to a geologic repository (assumed for the purposes of analysis to be the proposed Yucca Mountain Repository near Las Vegas, Nevada), (2) Ship low-level radioactive waste (LLW) and mixed (radioactive and hazardous) LLW offsite for disposal at DOE or other disposal sites, (3) Ship transuranic (TRU) radioactive waste to the Waste Isolation Pilot Plant (WIPP), and (4) Actively manage the waste storage tanks. The waste volumes that are the subject of evaluation in this EIS include only those wastes that are either currently in storage or that would be generated over the next 10 years from ongoing operations and decontamination activities. This EIS analyzes activities that would occur during a 10-year period.

  4. McNary-John Day Transmission Line Project, Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-30T23:59:59.000Z

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

  5. Draft environmental assessment -- Test Area North pool stabilization project update

    SciTech Connect (OSTI)

    NONE

    1997-06-01T23:59:59.000Z

    The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

  6. Linear Algebra Research Project Rough Draft Nick Davis Camera Transformations in OpenGL ES 2.0

    E-Print Network [OSTI]

    Marzuola, Jeremy

    Linear Algebra Research Project Rough Draft Nick Davis Camera Transformations in OpenGL ES 2.0 Since the advent of the analog computer the power of visual display has played an integral part graphical output, including components designed solely for calculating graphics (Graphics Processing Units

  7. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  8. Learning to Locate Informative Features for Visual Identification DRAFT: IJCV special issue www.eecs.berkeley.edu/Research/Projects/CS/vision/shape/vid

    E-Print Network [OSTI]

    Massachusetts at Amherst, University of

    Learning to Locate Informative Features for Visual Identification DRAFT: IJCV special issue www.eecs.berkeley.edu/Research/Projects group such as red sedans, or the nar- rowest possible group, a single element group containing

  9. BPAs proposed I-5 Corridor Reinforcement Project, draft EIS...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    environmental impact statement comment form Public review of and comment on this draft EIS will continue through March 1, 2013. Comments should be as specific as possible, with...

  10. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

  11. EIS-0474: Southline Transmission Line Project; Arizona and New Mexico

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EIS to evaluate the environmental impacts of the proposed Southline Transmission Project, which would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations.

  12. Northeast Corridor improvement project draft environmental impact statement/report for electrification of Northwest Corridor, New Haven, CT. to Boston, MA. Volume 3. Technical appendices. Final report, September 1992-September 1993

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The impacts of extending electrification on the National Railroad Passenger Corporation's (Amtrak) Northeast Corridor (NEC) from New Haven, Connecticut to Boston, Massachusetts are of direct concern to the Federal Railroad Administration (FRA). To improve rail service and increase ridership between New York and Boston, Amtrak proposes the electrification of the NEC main line between New Haven, CT and Boston, MA using an overhead 2 x 25,000 volt - 60 hertz power system. The volume Number III contains the detailed technical studies that were performed in order to identify and evaluate the environmental impacts of the proposed project. Some of these studies have been included entirely in the Draft Environmental Impact Statements-draft (DEIS/R) (Volume 1). The technical evaluations performed were based upon regulatory requirements as well as substantive issues raised by individuals and public agencies as part of the public participation program.

  13. CXD 4601, Line Yard Fence Project (4601)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced. C o w l i t z C o . C l a r8.0 -CURRICULUM VITAEAllen RadioLine

  14. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  15. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    SciTech Connect (OSTI)

    Lane, Michael

    2012-01-01T23:59:59.000Z

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  16. EIS-0486: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    486: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0486: EPA Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line...

  17. Plains & Eastern Clean Line Project Proposal for New or Upgraded...

    Office of Environmental Management (EM)

    2011) More Documents & Publications EIS-0486: Draft Environmental Impact Statement HVDC Workshop - April 22, 2013 EIS-0486: Notice of Intent and Notice of Potential Floodplain...

  18. EIS-0439: EPA Notice of Availability of the Draft Environmental...

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0439: EPA Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, California...

  19. EIS-0439: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0439: DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western...

  20. EIS-0440: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0440: DOE Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy Project Quartzsite Solar Energy...

  1. EIS-0440: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy Project Quartzsite Solar Energy...

  2. EIS-0450: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah,...

  3. EIS-0441: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0441: EPA Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm Project,...

  4. EIS-0489: FERC Notice of Availability of Draft Environmental...

    Energy Savers [EERE]

    FERC Notice of Availability of Draft Environmental Impact Statement EIS-0489: FERC Notice of Availability of Draft Environmental Impact Statement Jordan Cove Liquefaction Project...

  5. EIS-0413: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces...

  6. EIS-0489: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    89: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0489: EPA Notice of Availability of Draft Environmental Impact Statement Jordan Cove Liquefaction Project...

  7. EIS-0457: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties,...

  8. GLIDES PROJECT GuideLines Into DEcision Support

    E-Print Network [OSTI]

    Lee, Daeyeol

    GLIDES PROJECT GuideLines Into DEcision Support sponsored by The Agency for Healthcare Research;Topics · GLIDES 4-level "stack" ­ NarraAve guideline with quality, implementabilityLon, and local coding/linking ­ To Formal Quality Measure via QDM, eMeasure · BRIDGE

  9. Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project, Mile 6 to Oracle Substation Categorical Exclusion Continuation Sheet Project Description Maintenance work at...

  10. LOCH: Open Access Facilitator Job Description (DRAFT

    E-Print Network [OSTI]

    McMahon, Jacqueline

    2015-03-23T23:59:59.000Z

    DRAFT Job Description for an Open Access Facilitator job in the University of Edinburgh's College of Humanities and Social Sciences. This draft job description is being made available as part of the Jisc-funded LOCH Project....

  11. Draft New England Clean Power Link Power Project Environmental Impact Statement Appendix A-L

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3:CPublic Comment |D

  12. Draft New England Clean Power Link Project Environmental Impact Statement Appendix A-L

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3:CPublic Comment |DSheet

  13. Draft New England Clean Power Link Project Environmental Impact Statement Appendix A-L

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3:CPublic Comment

  14. Draft New England Clean Power Link Project Environmental Impact Statement Volume I

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3:CPublic CommentCover

  15. Project Schedules and Milestones Draft July 2014 Site Management Plan Page 1

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA groupTuba City, Arizona, DisposalFourthN V O 1 8 7 +NewAugust OnlyDraft July 2014

  16. PURE Math 2012 Ideas for Research Projects First Draft April 28, 2012

    E-Print Network [OSTI]

    Little, John B.

    for context and ideas ­ all projects [S] Saari, Donald G. Central Congurations­A Problem for the Twenty

  17. Draft M&V Guidelines: Measurement and Verification for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 4.0) Draft M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version...

  18. EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Draft Supplemental Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement Keystone XL Project EPA announces...

  19. Great Northern Transmission Line Project Draft Environmental Impact Statement_Volume I

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To: CongestionDevelopment of aLogging SystemsResidential Savings

  20. Great Northern Transmission Line Project Draft Environmental Impact Statement_Volume II

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To: CongestionDevelopment of aLogging SystemsResidential SavingsO

  1. Draft Northern Pass Transmission Line Project Environmental Impact Statement Volume 1: Impact Analyses

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1Energy | DepartmenttheFebruarySunShot

  2. Draft Northern Pass Transmission Line Project Environmental Impact Statement_Summary

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1Energy | DepartmenttheFebruarySunShotSUMMARY JULY 2015 DOE/EIS-0463

  3. UMTRA Project Office Federal Employee Occupational Safety and Health Program Plan. Final draft

    SciTech Connect (OSTI)

    Young, B.H.

    1994-02-01T23:59:59.000Z

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with the applicable requirements of DOE Order 3790.1 B and DOE Albuquerque Operations Office (AL) Order 3790.1A. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES&H) Plan (DOE, 1992), which establishes the basic programmatic ES&H requirements for all participants on the UMTRA Project. The ES&H plan is designed primarily to cover remedial action activities at UMTRA sites, and defines the ES&H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES&H program and covers only the federal employees working on the UMTRA Project.

  4. EIS-0463: Northern Pass Transmission Line Project, New Hampshire |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1Energy |FinalEESS-7 to|GranbyChamplain HudsonDraft

  5. Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin)

    Broader source: Energy.gov [DOE]

    This page describes application requirements for all projects that involve the installation of an electricity transmission line or substation that also require either a Certificate of Public...

  6. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    SciTech Connect (OSTI)

    Gasper, John R. [Argonne National Laboratory] [Argonne National Laboratory; Veselka, Thomas D. [Argonne National Laboratory] [Argonne National Laboratory; Mahalik, Matthew R. [Argonne National Laboratory] [Argonne National Laboratory; Hayse, John W. [Argonne National Laboratory] [Argonne National Laboratory; Saha, Samrat [Argonne National Laboratory] [Argonne National Laboratory; Wigmosta, Mark S. [PNNL] [PNNL; Voisin, Nathalie [PNNL] [PNNL; Rakowski, Cynthia [PNNL] [PNNL; Coleman, Andre [PNNL] [PNNL; Lowry, Thomas S. [SNL] [SNL

    2014-05-19T23:59:59.000Z

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  7. draft 3/13/14 Session 6: Integrated Product Development and Project Management

    E-Print Network [OSTI]

    Martin, Gail

    D, Senior Vice President, Project Management, Endo 8:35 am 60 Decision Analysis Tools and Techniques Patricia Evans, PhD, Independent Consultant 9:35 am 50 Product Development Decision Making John Celona, JD:50 pm 45 Case Study 12: Balancing Risk and Return in Portfolio Management Patricia Evans, Ph

  8. Lovell-Yellowtail transmission line rebuild project, Western...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail...

  9. Internal Draft Do Not Disseminate

    E-Print Network [OSTI]

    Christian, Eric

    ............................................................................33 2.7 Use of Earned Value ManagementInternal Draft Do Not Disseminate NASA SPACE FLIGHT PROGRAM AND PROJECT MANAGEMENT HANDBOOK Office............................................................................................................................2 1.4 Overview of Management Process

  10. Uncertainty and Sensitivity Analyses Plan. Draft for Peer Review: Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Simpson, J.C.; Ramsdell, J.V. Jr.

    1993-04-01T23:59:59.000Z

    Hanford Environmental Dose Reconstruction (HEDR) Project staff are developing mathematical models to be used to estimate the radiation dose that individuals may have received as a result of emissions since 1944 from the US Department of Energy`s (DOE) Hanford Site near Richland, Washington. An uncertainty and sensitivity analyses plan is essential to understand and interpret the predictions from these mathematical models. This is especially true in the case of the HEDR models where the values of many parameters are unknown. This plan gives a thorough documentation of the uncertainty and hierarchical sensitivity analysis methods recommended for use on all HEDR mathematical models. The documentation includes both technical definitions and examples. In addition, an extensive demonstration of the uncertainty and sensitivity analysis process is provided using actual results from the Hanford Environmental Dose Reconstruction Integrated Codes (HEDRIC). This demonstration shows how the approaches used in the recommended plan can be adapted for all dose predictions in the HEDR Project.

  11. Fast three-dimensional terahertz computed tomography using real-time line projection of

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Fast three-dimensional terahertz computed tomography using real-time line projection of intense terahertz computed tomography by using real-time line projection of intense terahertz beam generated). 4. B. Ferguson, S. Wang, D. Gray, D. Abbot, and X.-C. Zhang, "T-ray computed tomography," Opt. Lett

  12. Draft Air Pathway Report: Phase 1 of the Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Not Available

    1990-07-20T23:59:59.000Z

    This report summarizes the air pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project, conducted by Battelle staff at the Pacific Northwest Laboratory under the direction of an independent Technical Steering Panel. The HEDR Project is estimating historical radiation doses that could have been received by populations near the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the air-pathway dose reconstruction sought to determine whether dose estimates could be calculated for populations in the 10 counties nearest the Hanford Site from atmospheric releases of iodine-131 from the site from 1944--1947. Phase 1 demonstrated the following: HEDR-calculated source-term estimates of iodine-131 releases to the atmosphere were within 20% of previously published estimates; calculated vegetation concentrations of iodine-131 agree well with previously published measurements; the highest of the Phase 1 preliminary dose estimates to the thyroid are consistent with independent, previously published estimates of doses to maximally exposed individuals; and relatively crude, previously published measurements of thyroid burdens for Hanford workers are in the range of average burdens that the HEDR model estimated for similar reference individuals'' for the period 1944--1947. 4 refs., 10 figs., 9 tabs.

  13. EIS-0317: Kangley-Echo Lake Transmission Line Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

  14. EIS-0474: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Draft Environmental Impact Statement Southline Transmission Project, Arizona and New Mexico EPA announces the availability of the Southline Transmission Project, (Arizona and...

  15. EIS-0460: EPA Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0460: EPA Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project,...

  16. EIS-0101: Thermopolis, Alcova, Casper Transmission Line Project

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this statement to evaluate the environmental impacts of constructing, operating and maintaining a 230-kilovolt transmission line between Thermopolis, Wyoming, and Alcova, Wyoming, and a 230/345-kilovolt transmission line between Alcova, Wyoming, and Casper, Wyoming.

  17. A conjugate Rosen's gradient projection method with global line search for piecewise linear optimization

    E-Print Network [OSTI]

    Beltran-Royo, Cesar

    A conjugate Rosen's gradient projection method with global line search for piecewise linear cutting plane method, simplex method, Rosen's gradient projection, conjugate gradient. 1 Introduction the zig-zagging of the gradient projection, we propose a conjugate gradient version of the face simplex

  18. Sustainable biomass products development and evaluation, Hamakua project. Final draft report

    SciTech Connect (OSTI)

    NONE

    1998-05-01T23:59:59.000Z

    The PICHTR Sustainable Biomass Energy Program was developed to evaluate the potential to cultivate crops for energy production as an alternative use of lands made available by the closing of large sugar plantations. In particular, the closing of the Hamakua Sugar Company on the island of Hawaii brought a great deal of attention to the future of agriculture in this region and in the state. Many options were proposed. Several promising alternatives had been proposed for cane lands. These included dedicated feedstock supply systems (DFSS) for electrical energy production, cultivation of sugarcane to produce ethanol and related by-products, and the production of feed and crops to support animal agriculture. Implementation of some of the options might require preservation of large tracts of land and maintenance of the sugar mills and sugar infrastructure. An analysis of the technical, financial, and other issues necessary to reach conclusions regarding the optimal use of these lands was required. At the request of the Office of State Planning and Senator Akaka`s office, the Pacific International Center for High Technology Research (PICHTR) established and coordinated a working group composed of state, county, federal, and private sector representatives to identify sustainable energy options for the use of idle sugar lands on the island of Hawaii. The Sustainable Biomass Energy Program`s Hamakua Project was established to complete a comprehensive evaluation of the most viable alternatives and assess the options to grow crops as a source of raw materials for the production of transportation fuel and/or electricity on the island of Hawaii. The motivation for evaluating biomass to energy conversion embraced the considerations that Hawaii`s energy security would be improved by diversifying the fuels used for transportation and reducing dependency on imported fossil fuels. The use of waste products as feedstocks could divert wastes from landfills.

  19. EIS-0486: Plains & Eastern Clean Line Transmission Project |...

    Broader source: Energy.gov (indexed) [DOE]

    project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver...

  20. EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...

    Broader source: Energy.gov (indexed) [DOE]

    rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. Additional information is available at the...

  1. EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

  2. EIS-0106: Great Falls-Conrad Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

  3. A Representation of Projective Space by the Points of a Line

    E-Print Network [OSTI]

    Hess, George Wellman

    1911-05-01T23:59:59.000Z

    fG fW. 1911 (Mathematics) Representation of project ive space by the points o JL i-ii^5 • A REPRESENTATION OF PROJECTIVE SPACE BY THE POINTS OF A LINE. GEORGE TOLLMAN "BESS. A thesis submitted in partial fulfilment of the requirements...-to-one recipro- cal correspondence with the elements of another planar pencil, which may be either a pencil of points on the same line 1 or on a line distinct from 1 or a pencil of planar lines [l 1!. EJLfiSfif 'EfiCiSfifiaiixaiifia. If IF*] and [O1...

  4. Environmental impact statement/state analysis report. Cedar Bay Cogeneration Project, Jacksonville, Florida (EPA and FDER). Including Technical Appendix. Draft report. [Independent Power Generation

    SciTech Connect (OSTI)

    Not Available

    1990-05-01T23:59:59.000Z

    AES/Cedar Bay, Inc. proposes to construct and operate a cogeneration facility on and existing industrial site within the North District of Duval County, approximately eight miles north of Jacksonville, Florida. The plant will produce 225 megawatts of electricity for sale to Florida Power and Light Company. In addition, steam will be sold to the adjacent Seminole Kraft Corporation paper mill. The document, prepared pursuant to the National Environmental Policy Act, assesses the proposed project and alternatives with respect to impacts on the natural and man-made environments. Potential mitigative measures are also evaluated. The Technical Appendix includes a copy of U.S. EPA's draft National Pollutant Discharge Elimination System permit, FDER's Conditions of Power Plant Siting Certification, as well as other state agency reports pertinent to the proposed project.

  5. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  6. EIS-0124: Conrad-Shelby Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

  7. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  8. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  9. Towards Software Product Lines Application in the Context of a Smart Building Project

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Towards Software Product Lines Application in the Context of a Smart Building Project Thibaut. This paper presents proposals on how to apply software prod- uct lines in the context of smart buildings the various components involved in smart buildings, and to capitalize on the devel- oped IT components

  10. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Michael Lane

    Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

  11. EIS-0422: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Line, Garfield, Columbia and Walla Walla Counties, Washington. Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt...

  12. EIS-0442: EPA Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Lines on Forest Service Lands, Colorado, Nebraska, and Utah EPA announces the availability of the Draft Environmental Impact Statement for the Reauthorization of Permits,...

  13. EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona

    Broader source: Energy.gov [DOE]

    Western Area Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of a 35.6-mile transmission line that Western operates and maintains under an agreement with the Central Arizona Project. Additional information is available on the project website, http://www.wapa.gov/dsw/environment/ED2DOEEA1972.htm.

  14. Sacramento Area Voltage Support Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-11-15T23:59:59.000Z

    The Western Area Power Administration's Central Valley Project transmission system forms an integral part of the interconnected Sacramento area transmission grid. Western is contractually responsible to oversee that the system is operated in accordance with strict reliability standards. Growth in the greater Sacramento, California area and power imported from generation outside the region, have increased the demand on the interconnected electric transmission system, leading to transmission system overloads and reducing the reliability and security of the area power system. Western has prepared this Sacramento Area Voltage Support (SVS) Draft Environmental Impact Statement (EIS) in compliance with Federal laws, regulations and guidelines, principally the ''National Environmental Policy Act'' (NEPA). This Draft EIS evaluates the potential environmental effects of physical improvements to the area's power system. Enhancements are needed to improve system reliability and provide voltage support for the Sacramento area. The results of public scoping meetings, workshops, meetings with agencies, and earlier studies by Western and area utilities helped to develop a range of alternatives for analysis. The Proposed Action involves: Constructing a new double-circuit, 230-kV transmission line paralleling the existing double-circuit, 230-kV line from the O'Banion Substation to the Elverta Substation; Realigning a portion of the existing Cottonwood-Roseville single-circuit, 230-kV transmission line north of Elverta Substation; and Reconductoring the existing double-circuit, 230-kV transmission line from the Elverta Substation to the Tracy Substation. Public Hearings on the Draft EIS will be held between December 9-12, 2002. Comments on this Draft EIS are encouraged and should be sent to Ms. Loreen McMahon (above). Comments must be received by December 30, 2002.

  15. EIS-0445: Postponement of Public Hearing on the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia Postponement of Public Hearing on the Draft Environmental Impact Statement for the...

  16. EIS-0397: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement Lyle Falls Fish Passage Project To Improve Fish Passage to Habitat in the Upper Part of the Watershed,...

  17. EA-1989: Draft Environmnetal Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona Western Area Power Administration issued a draft EA that assesses the potential environmental impacts of...

  18. EA-1976D: Notice of Availability of Draft Environmental Assessment...

    Energy Savers [EERE]

    Notice of Availability of Draft Environmental Assessment Emera CNG, LLC Compressed Natural Gas Project, Florida DOE's National Energy Technology Laboratory (NETL) announces...

  19. EIS-0464: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    DOE Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County,...

  20. EIS-0464: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Protection Agency announces the availability of the Draft EIS for the Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County,...

  1. EIS-0431: DOE Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA DOE announces the availability of the Draft Environmental Impact Statement for...

  2. EIS-0487: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    EIS-0487: EPA Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas EPA announces the availability of the...

  3. EIS-0478: EPA Notice of Availability of a Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    EPA announces the availability of the Draft EIS for the Antelope Valley Station to Neset Transmission Project, prepared by the Rural Utility Service. This EIS evaluates the...

  4. EIS-0383: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Station Energy Center near Orlando, FL Environmental Protection Agency Notice of Availability of the Orlando Gasification Project Draft Environmental Impact Statement (DOE...

  5. EIS-0394: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    IL, Jewett, TX and Odessa, TX, EPA Environmental Impact Statements: Notice of Availability for the Draft Environmental Impact Statement for the FutureGen Project (DOE...

  6. EIS-0444: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Notice of Availability - Draft Environmental Impact Statement Texan Clean Energy Project, Construction and Operation of a Coal-Based Electric Power Generation and Chemicals...

  7. EIS-0444: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Notice of Availability of the Draft Environmental Impact Statement and Public Hearing Notice for the Texas Clean Energy Project, near Odessa, Ector County, Texas, DOEEIS-0444...

  8. EA-1800: Draft Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Assessment EA-1800: Draft Environmental Assessment Monarch Warren County Wind Turbine Project, Lenox Township, Warren County, Illinois The U.S. Department of Energy (DOE)...

  9. Extension of Comment Period on the Draft Integrated, Interagency...

    Energy Savers [EERE]

    Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of...

  10. EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  11. Project W-314 sn-630 transfer line az-02a to an-b acceptance for beneficial use

    SciTech Connect (OSTI)

    Warnick, T. L.

    1997-09-29T23:59:59.000Z

    Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

  12. Project W-314 sn-634 transfer line a-b to ax-b acceptance for beneficial use

    SciTech Connect (OSTI)

    Warnick, T. L.

    1997-09-29T23:59:59.000Z

    Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

  13. Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

  14. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

  15. (Final Draft) Superconducting

    E-Print Network [OSTI]

    ANDAND (Final Draft) Achieving Advanced Electrical Wires From Superconducting Coatings Prepared and Development Roadmap to Achieve Electrical Wire Advancements from Superconducting Coatings (Final Draft) Edited

  16. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |Is Your HomeLatestCenter (LMI-EFRC) -Choices toLee FacultyLinda

  17. EIS-0365: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines Imperial-Mexicali 230-kV Transmission Lines, Construct a Double-Circuit 230-kV...

  18. DRAFT NISTIR 8014 DRAFT NISTIR 80142

    E-Print Network [OSTI]

    DRAFT NISTIR 8014 1 DRAFT NISTIR 80142 3 4 Considerations for Identity5 Management in Public Safety 23 24 #12;DRAFT NISTIR 8014 NISTIR 801425 26 27 Considerations for Identity28 Management in Public wish to closely follow the development of these new publications by NIST. Organizations are encouraged

  19. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  20. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

  1. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  2. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    SciTech Connect (OSTI)

    NONE

    1993-10-01T23:59:59.000Z

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  3. The Sloan Digital Sky Survey Reverberation Mapping Project: Ensemble Spectroscopic Variability of Quasar Broad Emission Lines

    E-Print Network [OSTI]

    Sun, Mouyuan; Shen, Yue; Brandt, W N; Dawson, Kyle; Denney, Kelly D; Hall, Patrick B; Ho, Luis C; Horne, Keith; Jiang, Linhua; Richards, Gordon T; Schneider, Donald P; Bizyaev, Dmitry; Kinemuchi, Karen; Oravetz, Daniel; Pan, Kaike; Simmons, Audrey

    2015-01-01T23:59:59.000Z

    We explore the variability of quasars in the MgII and Hbeta broad emission lines and UV/optical continuum emission using the Sloan Digital Sky Survey Reverberation Mapping project (SDSS-RM). This is the largest spectroscopic study of quasar variability to date: our study includes 29 spectroscopic epochs from SDSS-RM over $6$ months, containing 357 quasars with MgII and 41 quasars with Hbeta . On longer timescales, the study is also supplemented with two-epoch data from SDSS-I/II. The SDSS-I/II data include an additional $2854$ quasars with MgII and 572 quasars with Hbeta. The MgII emission line is significantly variable ($\\Delta f/f$ 10% on 100-day timescales), indicating that it is feasible to use the broad MgII line for reverberation mapping studies. The data also confirm that continuum variability increases with timescale and decreases with luminosity, and the continuum light curves are consistent with a damped random-walk model on rest-frame timescales of $\\gtrsim 5$ days. We compare the emission-line and...

  4. Phase I Archaeological Investigation Cultural Resources Survey, Hawaii Geothermal Project, Makawao and Hana Districts, South Shore of Maui, Hawaii (DRAFT )

    SciTech Connect (OSTI)

    Erkelens, Conrad

    1994-03-01T23:59:59.000Z

    This report details the archaeological investigation of a 200 foot wide sample corridor extending approximately 9 miles along the southern portion of Maui within the present districts of Hana and Makawao. A total of 51 archaeological sites encompassing 233 surface features were documented. A GPS receiver was used to accurately and precisely plot locations for each of the documented sites. Analysis of the locational information suggests that archaeological sites are abundant throughout the region and only become scarce where vegetation has been bulldozed for ranching activities. At the sea-land transition points for the underwater transmission cable, both Ahihi Bay and Huakini Bay are subjected to seasonal erosion and redeposition of their boulder shorelines. The corridor at the Ahihi Bay transition point runs through the Moanakala Village Complex which is an archaeological site on the State Register of Historic Places within a State Natural Area Reserve. Numerous other potentially significant archaeological sites lie within the project corridor. It is likely that rerouting of the corridor in an attempt to avoid known sites would result in other undocumented sites located outside the sample corridor being impacted. Given the distribution of archaeological sites, there is no alternative route that can be suggested that is likely to avoid encountering sites. A total of twelve charcoal samples were obtained for potential taxon identification and radiocarbon analysis. Four of these samples were subsequently submitted for dating and species identification. Bird bone from various locations within a lava tube were collected for identification. Sediment samples for subsequent pollen analysis were obtained from within two lava tubes. With these three sources of information it is hoped that paleoenvironmental data can be recovered that will enable a better understanding of the setting for Hawaiian habitation of the area. A small test unit was excavated at one habitation site. Charcoal, molluscan and fish remains, basalt tools, and other artifacts were recovered. This material, while providing an extremely small sample, will greatly enhance our understanding of the use of the area. Recommendations regarding the need for further investigation and the preservation of sites within the project corridor are suggested. All sites within the project corridor must be considered potentially significant at this juncture. Further archaeological investigation consisting of a full inventory survey will be required prior to a final assessment of significance for each site and the development of a mitigation plan for sites likely to be impacted by the Hawaii Geothermal Project.

  5. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    SciTech Connect (OSTI)

    None

    1992-09-18T23:59:59.000Z

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  6. Design and Manufacture of the RF Power Supply and RF Transmission Line for SANAEM Project Prometheus

    E-Print Network [OSTI]

    Turemen, G; Unel, G; Alacakir, A

    2015-01-01T23:59:59.000Z

    A 1-5 MeV proton beamline is being built by the Turkish Atomic Energy Authority in collaboration with a number of graduate students from different universities. The most important aspect of the project, is to acquire the design ability and manufacturing capability of all the components locally. SPP will be an accelerator and beam diagnostics test facility and it will also serve the detector development community with its low beam current. This paper discusses the design and construction of the RF power supply and the RF transmission line components such as its waveguide converters and its circulator.

  7. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    SciTech Connect (OSTI)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01T23:59:59.000Z

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  8. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  9. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  10. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01T23:59:59.000Z

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  11. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01T23:59:59.000Z

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  12. EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz...

  13. EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environment...

    Energy Savers [EERE]

    Intent to Prepare a Supplemental Draft Environmental Impact Statement Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota Western Area Power...

  14. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  15. Fort Peck-Havre transmission line project, Hill, Blaine, Phillips, Valley and McCone Counties, Montana

    SciTech Connect (OSTI)

    Not Available

    1982-09-01T23:59:59.000Z

    Construction and operation of a 180-mile, 230-kilovlt (kV) transmission line between Fort Peck and Havre, Montana is proposed to provide a replacement for the 161-kV line that currently runs between the two cities. The new line would be carried on woodpole, H-frame structures. The existing 161-kV line would be removed, and the Richardson Coulee Substation would be relocated. Intermediate facilities to be improved would include the Fort Peck Switchyard and the Richardson Coulee, Malta, Harlem, and Havre substations.Construction of the line would commence in August 1983, and operation would commence in January 1986. The expected life of the transmission system would be 100 years. Estimated cost of the project, in 1983 dollars, is $36.1 million. The project would upgrade an essential element of the Western Area Power Administration's electric power system and the Montana Power Company's interconnected transmission network. Continued electric service reliability would be improved, and safety conditions affecting personnel who maintain the line would be enhanced. Additional transmission capacity would be provided to accommodate future load growth, precluding the need for multiple transmission lines. The line would eleminate seven acres of productive land and create physical conflicts with present and future agricultural activities. The line would traverse areas characterized by concentrations of archaeological resources and cultural resources of importance to native Americans. Transmission structures could mar scenery in areas with historically significant architecture and would interfere with waterfowl.

  16. The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

    2009-09-01T23:59:59.000Z

    The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

  17. The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Fenner, Marsha W; Liolios, Konstantinos; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Kyrpides, Nikos C.

    2007-12-31T23:59:59.000Z

    The Genomes On Line Database (GOLD) is a comprehensive resource of information for genome and metagenome projects world-wide. GOLD provides access to complete and ongoing projects and their associated metadata through pre-computed lists and a search page. The database currently incorporates information for more than 2900 sequencing projects, of which 639 have been completed and the data deposited in the public databases. GOLD is constantly expanding to provide metadata information related to the project and the organism and is compliant with the Minimum Information about a Genome Sequence (MIGS) specifications.

  18. EIS-0473: DOE Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX DOE announces the...

  19. EIS-0450: DOE Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    DOE announces the availability of the Draft EIS for the TransWest Express Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's...

  20. Department of Energy Issues Draft Renewable Energy and Efficient...

    Energy Savers [EERE]

    the Department of Energy issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the U.S. that avoid, reduce, or...

  1. Deepwater Horizon Oil Spill; Draft Programmatic and Phase III Early

    E-Print Network [OSTI]

    Deepwater Horizon Oil Spill; Draft Programmatic and Phase III Early Restoration Plan of the Deepwater Horizon oil spill. The restoration alternatives are comprised of early restoration project types Addressing Injuries Resulting from the Deepwater Horizon Oil Spill (Framework Agreement). Criteria

  2. EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004)

    Broader source: Energy.gov [DOE]

    A U.S. Department of Energy (DOE) Presidential permit is required to construct an electric transmission line across the U.S. international border. On February 27, 2001, Baja California Power, Inc. ...

  3. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  4. Notice of Availability of Plains & Eastern Clean Line Transmission Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page onYouTube YouTube Note: Since the.pdfBreaking ofOilNEW HAMPSHIREofNewsletterEnergy Heating OilVolume 79, No. 250Draft

  5. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    Contributing Authors Gene Strecker Project Manager Jim Page Office Manager Fossil Fuels Office Pat Perez DeputyCalifornia Energy Commission DRAFT STAFF REPORT TRANSPORTATION ENERGY FORECASTS AND ANALYSES FOR THE 2011 INTEGRATED ENERGY POLICY REPORT CALIFORNIA ENERGY COMMISSION Edmund G. Brown, Jr., Governor

  6. The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  7. Announcement of Change in Public Meeting Location for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department announces a change of location for the September 26, 2013 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. The meeting will be from 5 to 8 p.m.

  8. OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project

    Broader source: Energy.gov [DOE]

    On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

  9. Development of a special nuclear materials monitoring sensor pack for Project Straight-Line

    SciTech Connect (OSTI)

    Daily, M.R.; Moreno, D.J.; Tolk, K.M.; Wilcoxen, J.L. [Sandia National Labs., Albuquerque, NM (United States); Oetken, R.E.; Collins, J.E.; Miller, R.; Olsen, R.W. [Sandia National Labs., Livermore, CA (United States); Sheets, L. [Allied-Signal, Kansas City, MO (United States). Kansas City Division

    1995-12-31T23:59:59.000Z

    With the end of the Cold War and the accelerated dismantlement of nuclear weapons, the nuclear material inventory of the United States is growing. In addition, the United States has offered these excess weapons-grade nuclear material assets for international inspections with the intent of encouraging reciprocal action by other nations. In support of this policy, Sandia National Laboratories has initiated a pilot effort (Project Straight-Line) to develop a flexible, site-independent system to continuously and remotely monitor stored nuclear material and integrate the collection, processing, and dissemination of information regarding this material to ensure that declared nuclear materials placed in storage remain in place, unaltered, and stable. As part of this effort, a +3.6V battery powered, modular sensor pack has been developed to monitor total radiation dose, radiation dose rate, and the temperature of each nuclear material container and to provide this information using a standardized sensor interface. This paper will discuss the development of the sensors, the engineering and production of the sensor pack units, and their installation and operation at sites in New Mexico, California, and the Pantex plant in Amarillo.

  10. DRAFT 1999 DRAFT AIRPORT PRIVATIZATION

    E-Print Network [OSTI]

    Entekhabi, Dara

    Professor and Chairman Technology and Policy Program Room E40-245 Massachusetts Institute of Technology PRIVATIZATION ISSUES FOR THE UNITED STATES Richard de Neufville Technology and Policy Program Massachusetts airports into wholly private businesses. Most privatization projects involve substantial regulation

  11. Draft 1

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO OverviewAttachments461-93Do-It-Yourself ProjectsDocument DocumentLimitsDr.

  12. Draft 1

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO OverviewAttachments461-93Do-It-Yourself ProjectsDocument DocumentLimitsDr.08 Charter for

  13. Draft 1

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO OverviewAttachments461-93Do-It-Yourself ProjectsDocument DocumentLimitsDr.08 Charter for-

  14. Draft AGENDA

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO OverviewAttachments461-93Do-It-Yourself ProjectsDocument DocumentLimitsDr.08

  15. 2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles

    E-Print Network [OSTI]

    Leung, Victor C.M.

    .M. Leung (vleung@ece.ubc.ca) 1. Project description In today's electric and conventional combustion engine

  16. The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program

    E-Print Network [OSTI]

    Ickert-Bond, Steffi

    DRAFTING TECHNOLOGY The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program offers a choice of six areas of emphasis: architectural drafting; civil drafting; information technology; mechanical and electrical drafting; process

  17. Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation...

    Office of Environmental Management (EM)

    Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Solicitation...

  18. Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-06-20T23:59:59.000Z

    BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

  19. Power Line Damage, Electrical Outages Reduced in the ''Sleet Belt'': NICE3 Steel Project Fact Sheet

    SciTech Connect (OSTI)

    NONE

    2000-04-25T23:59:59.000Z

    The AR Windamper System was developed through a grant from the Inventions and Innovation Program, to protect power transmission lines in sleet belt states and provinces by eliminating the ''galloping'' phenomenon. Wind damping products minimize power outages and reduce repair costs to transmission lines.

  20. EIS-0505: Supplemental Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton, and Kittitas Counties, Washington

  1. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01T23:59:59.000Z

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  2. Evaluation of Canal Lining Projects in the Lower Rio Grande Valley

    E-Print Network [OSTI]

    Karimov, Askar; Leigh, Eric; Fipps, Guy

    Since 1999, seven (7) irrigation districts in the Lower Rio Grande Valley of Texas have installed six (6) different types of synthetic canal lining materials, totaling approximately 21 miles. In 2005, we began a program to track the long...

  3. EIS-0332: McNary-John Day Transmission Line Project, OR

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

  4. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

  5. EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western’s transmission system.

  6. EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California

    Broader source: Energy.gov [DOE]

    The Department of the Interior’s Bureau of Indian Affairs considered preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency. This project has been canceled.

  7. EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

  8. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  9. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  10. EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

  11. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana.

  12. EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

  13. Draft September 18, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraftDraft- RAP/PICV0,RSO9

  14. Draft Tiered Rate Methodology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraftDraft-8, 2012 WIPP

  15. EIS-0008-S: Supplement, Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate the environmental impacts of construction of a steel double-circuit 345-kilovolt transmission line from Moore Substation near Littleton, New Hampshire, to Comerford Substation near Monroe, New Hampshire and a 345-kilovolt wood pole transmission line from Comerford Substation to Webster Substation near Franklin, New Hampshire, as part of the Dickey-Lincoln School Lakes Transmission Project. The Final SEIS consists entirely of Section 9 (Consultation and Coordination), which incorporates public and agency comments on the Draft SEIS and responses to those comments, as well as all necessary errata and addenda to the Draft SEIS. This SEIS is a supplement to DOE/EIS-008, Dickey-Lincoln School Lakes Transmission Project.

  16. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1982-01-01T23:59:59.000Z

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  17. EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

  18. Plains & Eastern Clean Line Project Proposal for New or Upgraded

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM5Parabolic TroughPhotoCell StructureUraniumTransmission Line

  19. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County,

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S.ContaminationJuly 2011DDelphiFEA-2013.pdfBased onFinalLine, Benton and

  20. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S.ContaminationJuly 2011DDelphiFEA-2013.pdfBased onFinalLine,DOEPolson, Montana |

  1. Conservation Overview of Draft

    E-Print Network [OSTI]

    of wind will require increased reserves for within-hour balancing ­ There are actions that can be taken1 Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Power Committee Web Conference May 19, 2009 Northwest Power and Conservation Council Conditions Facing the Region · Slower demand

  2. Final Draft ENVIRONMENTAL ASSESSMENT

    E-Print Network [OSTI]

    Waliser, Duane E.

    Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE OF THE CONSTELLATION PROGRAM, JOHN F. KENNEDY SPACE CENTER, FLORIDA Abstract This Environmental Assessment addresses AERONAUTICS AND SPACE ADMINISTRATION JOHN F. KENNEDY SPACE CENTER ENVIRONMENTAL PROGRAM OFFICE KENNEDY SPACE

  3. Environmental Impact Statement Truckee Meadows Flood Control Project

    E-Print Network [OSTI]

    US Army Corps of Engineers

    DRAFT Environmental Impact Statement for the Truckee Meadows Flood Control Project Nevada General Reevaluation Report Volume I ­ Draft Environmental Impact Statement prepared by U.S. Army Corps of Engineers Sacramento District May 2013 #12;#12;DRAFT Environmental Impact Statement for the Truckee Meadows Flood

  4. Interim Draft for Internal NASA Use Only NASA SPACE FLIGHT PROGRAM AND

    E-Print Network [OSTI]

    Christian, Eric

    ............................................................................40 2.6 Use of Earned Value ManagementInterim Draft for Internal NASA Use Only INTERIM NASA SPACE FLIGHT PROGRAM AND PROJECT MANAGEMENT............................................................................................................................2 1.4 Overview of Management Process

  5. Quantum LDPC Codes Constructed from Point-Line Subsets of the Finite Projective Plane

    E-Print Network [OSTI]

    Jacob Farinholt

    2012-07-03T23:59:59.000Z

    Due to their fast decoding algorithms, quantum generalizations of low-density parity check, or LDPC, codes have been investigated as a solution to the problem of decoherence in fragile quantum states. However, the additional twisted inner product requirements of quantum stabilizer codes force four-cycles and eliminate the possibility of randomly generated quantum LDPC codes. Moreover, the classes of quantum LDPC codes discovered thus far generally have unknown or small minimum distance, or a fixed rate. This paper presents several new classes of quantum LDPC codes constructed from finite projective planes. These codes have rates that increase with the block length $n$ and minimum weights proportional to $n^{1/2}$.

  6. Trestle Bay Restoration Project Draft Feasibility Study and Draft

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33Frequently AskedEnergyIssuesEnergyTransportation Work Package ReportsSouthern

  7. Utility Energy Services Contracts: Enabling Documents DRAFT ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT Utility Energy Services Contracts: Enabling Documents DRAFT Presentation on Cyber Security given at the Federal Utility Partnership Working Group Fall 2008 meeting in...

  8. Conversion and correction factors for historical measurements of Iodine-131 in Hanford-area vegetation, 1945--1947: Draft. Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Mart, E.I.; Denham, D.H.; Thiede, M.E.

    1993-05-01T23:59:59.000Z

    This report is a result of the Hanford Environmental Dose Reconstruction (HEDR) Project whose goal is to estimate the radiation dose that individuals could have received from emissions since 1944 at the US Department of Energy`s (DOE) Hanford Site near Richland, Washington. The report describes in detail the reconstructed conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation which was collected from the beginning of October 1945 through the end of December 1947.

  9. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01T23:59:59.000Z

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  10. action review draft: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    management 2 Draft for Secretarial Review DRAFT ENVIRONMENTAL ASSESSMENT REGULATORY IMPACT REVIEW Environmental Sciences and Ecology Websites Summary: Draft for Secretarial...

  11. EIS-0439: Rice Solar Energy Project in Riverside County, CA ...

    Office of Environmental Management (EM)

    Riverside County, CA October 22, 2010 EIS-0439: EPA Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, California...

  12. Community- and Facility-Scale Renewable Energy Project Development...

    Energy Savers [EERE]

    energy.govindianenergy Community- and Facility-Scale Renewable Energy Project Development and Finance Workshop June 9-11, 2015 Riverwind Hotel and Casino Norman, Oklahoma DRAFT...

  13. Creating a new, sustainable community on the University's 5,000-acre property U seeks public comment on Draft EIS for proposed UMore Park Sand and Gravel

    E-Print Network [OSTI]

    Netoff, Theoden

    comment on Draft EIS for proposed UMore Park Sand and Gravel Resources Project, open house scheduled Impact Statement (EIS) for its proposed Sand & Gravel Resources Project on approximately 1,722 acres approved the Draft Environmental Impact Statement (EIS) for the proposed UMore Park Sand and Gravel

  14. NEW SOLAR HOMES PARTNERSHIP DRAFT GUIDEBOOK

    E-Print Network [OSTI]

    , module, inverter, plan check Nguyen, LeQuyen, Farakh Nasim. 2011. New Solar Homes Partnership Draft

  15. IMPEE PhD Opportunity Project title: LightFoot PhD A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal

    E-Print Network [OSTI]

    Greenaway, Alan

    IMPEE PhD Opportunity Project title: LightFoot PhD ­ A PhD Investigation Lightning Protection of HV.swingler@hw.ac.uk Abstract LightFoot PhD ­ A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal Tower Footing Resistance funded by SSE. The LightFoot PhD project takes a fresh approach at adding

  16. EIS-0315-S1: SEIS on Caithness Big Sandy Project

    Broader source: Energy.gov [DOE]

    In June 2001, the Bureau of Land Management (BLM) and Western Area Power Administration (Western) issued the Big Sandy Energy Project Draft Environmental Impact Statement (EIS) (BLM and Western 2001). After June 2001, Caithness Big Sandy, L.L.C. (Caithness), revised aspects of the Big Sandy Energy Project (Project) described as the Proposed Action in the Draft EIS.

  17. Draft Environmental Assessment

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3: Demand-Side23

  18. Draft 2009 Resource Program

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraft Resource Program

  19. Draft DOE P 226

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraft ResourceAdvice: ERDF

  20. EA-1705: Draft Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Draft Environmental Assessment EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter...

  1. Note: The State Clearinghouse will assign identification numbers for all new projects. If a SCH number already exists for a project (e.g. Notice of Preparation or previous draft document) please fill in.

    E-Print Network [OSTI]

    : City: Zip: County: Project Location: County: City/Nearest Community: Cross Streets: Zip Code: Longitude Waste Land Use Drainage/Absorption Population/Housing Balance Toxic/Hazardous Cumulative Effects For LCNG Fueling Facility California Energy Commission Donald Coe 1516 Ninth Street (916) 654

  2. Draft Inventory Upper Snake Province

    E-Print Network [OSTI]

    Draft Inventory Upper Snake Province Submitted To The Northwest Power and Conservation Council Portland, Oregon Prepared by December 2004 #12;BOI043620012.DOC/KG ii Contents Section Page Inventory

  3. Attachment 2: Draft Settlement Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-3621 POWER SERVICES January 28, 2009 DRAFT In reply refer to: Contract No. 09PB-...

  4. CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... 3-26 3.7.1 Use of Electric-Powered Compressors and Purchased Power ... 3-26 3.7.2 Other Design Options...

  5. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  6. Memorandum: Cost-effectiveness valuation framework for Demand Response Resources: Guidelines and Suggestions (DRAFT)

    E-Print Network [OSTI]

    Memorandum: Cost-effectiveness valuation framework for Demand Response Resources: Guidelines and Suggestions (DRAFT) To: Pacific Northwest Demand Response Project Cost-Effectiveness Working Group From: Chuck Northwest Demand Response Project agreed to form three Working Groups to explore DR issues in more detail

  7. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation.

  8. COMPASS Model Review Draft February 29, 2008

    E-Print Network [OSTI]

    Washington at Seattle, University of

    COMPASS Model Review Draft February 29, 2008 Page i Comprehensive Passage (COMPASS) Model ­ version 1.1 Review DRAFT February 2008 #12;COMPASS Model Review Draft February 29, 2008 Page ii Table-Bonneville survival 8c. Prospective hydrological modeling Appendix 9. Sensitivity analyses #12;COMPASS Model Review

  9. California Energy Commission REVISED DRAFT REGULATIONS

    E-Print Network [OSTI]

    California Energy Commission REVISED DRAFT REGULATIONS AUGUST, 2011 CEC-400-2010-004-SD2 Nonresidential Building Energy Use Disclosure Program Draft Regulations Title 20, Division 2, Chapter 4 of the California Energy Commission is releasing draft regulations for implementing Assembly Bill (AB) 1103 (Saldańa

  10. CUPM (Draft) Document Preface

    E-Print Network [OSTI]

    Carl Cowen

    1910-01-01T23:59:59.000Z

    added as technology has grown in importance and as more of our students ... Our first lines of defense against such illiteracy are the teachers in our schools.

  11. Environmental impact report (draft)

    SciTech Connect (OSTI)

    Not Available

    1980-05-01T23:59:59.000Z

    The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

  12. The Use and Benefits of Video Inspection in Lined and Unlined Ductwork in IAQ Surveys and "Source Removal" Cleaning Projects

    E-Print Network [OSTI]

    Kiec, T. M.

    New technology has developed video equipment capable of inspecting interior lined and unlined ductwork. Where IAQ (Indoor Air Quality) questions require inspections of suspicious air conveyance systems. Video recordings provide useful information...

  13. Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop

    SciTech Connect (OSTI)

    Galarowicz, James

    2014-01-06T23:59:59.000Z

    In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project team’s work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASC’s Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

  14. Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)

    SciTech Connect (OSTI)

    Muons, Inc.

    2011-05-19T23:59:59.000Z

    This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the companyâ??s continued success and growth is directly related to our expertise in applying this program to interesting applications.

  15. Energy Exchange Draft Schedule

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Economics of Financed Projects District Heating and Cooling: Optimized Comfort Data Center Energy Management Strategies Civilian Agency Roundtable Engaging Senior...

  16. Energy Exchange Draft Schedule

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Track 3 Track 4 Track 5 Track 6 Track 7 Track 8 Track 9 Track 10 Solution Showcase Agency Energy Manager Energy Technologies Sustainability Project Financing Integrated Energy...

  17. Modeling uncertainty in the New York City no. 7 subway line extension project using Decision Aids for Tunnelling (DAT)

    E-Print Network [OSTI]

    Hung, Vinnie

    2012-01-01T23:59:59.000Z

    Given the frequent cost overruns and schedule delays associated with underground construction projects, it is imperative that a detailed estimate of both be developed and considered prior to starting construction. The ...

  18. California Energy Commission Staff Draft

    E-Print Network [OSTI]

    Program funds for small cities and counties and be prioritized based on cost-effective energy efficiencyCalifornia Energy Commission Staff Draft BLOCK GRANT GUIDELINES (FORMULA-BASED GRANTS) ENERGY GLOSSARY #12;Energy Efficiency and Conservation Block Grant (EECBG) Program Guidelines 1. Background

  19. ANALYTIC COMPLETION (DRAFT) CHARLES REZK

    E-Print Network [OSTI]

    Rezk, Charles

    "Ext-p completion", and is well-known to be closely linked to computing the homotopy groups of p-completionsANALYTIC COMPLETION (DRAFT) CHARLES REZK Abstract. This is an expository treatment of what we call "analytic completion" of R- modules, which is a kind of completion defined in terms of quotients of power

  20. XIII.1-Draft ATTACHMENT XIII

    E-Print Network [OSTI]

    Kentucky, University of

    XIII.1-Draft ATTACHMENT XIII Review of Fischer-Tropsch Work by Statoil Three patents on Fischer-Tropsch that the common Fischer-Tropsch (FT) catalysts are nickel, cobalt and iron. Nickel is considered to be active recognize that others have used various combinations of metals for Fischer-Tropsch Synthesis (FTS

  1. August 10, 1997 DRAFT PROPOSAL

    E-Print Network [OSTI]

    McDonald, Kirk

    August 10, 1997 DRAFT PROPOSAL Ionization Cooling Research and Development Program for a High­year research and development program to develop the hardware needed for ionization cooling, and demonstrate cooling to be demonstrated, the calculations used to design the cooling system to be tested

  2. Draft Environmental Impact Statement

    Broader source: Energy.gov (indexed) [DOE]

    Environmental Impact Statement for the Searchlight Wind Energy Project NVN-084626 and NVN-086777 DES 11-52 Bureau of Land Management Las Vegas Field Office in cooperation with...

  3. Drifting absence :: drafting memory

    E-Print Network [OSTI]

    Kuhn, Marlene Eva

    2006-01-01T23:59:59.000Z

    The emotive power of a memorial derives from its ability to engage the viewer in active remembrance. The project considers the limitations of a monumentality which embraces a distinct division between viewer and memorial. ...

  4. EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration so that WAPA could supplement it in support of WAPA’s National Environmental Policy Act requirements for a related project.

  5. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

  6. EIS-0403: EPA Notice of Availability of the Draft Programmatic...

    Broader source: Energy.gov (indexed) [DOE]

    Notice of Availability, Draft Environmental Impact Statement: Programmatic-Solar Energy Development in Six Southwestern States. Notice of Availability, Draft Environmental Impact...

  7. Draft Specifications for Application of UNFC-2009 to Renewable...

    Open Energy Info (EERE)

    Draft Specifications for Application of UNFC-2009 to Renewable Energy Resources Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Draft Specifications for...

  8. DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas...

    Office of Environmental Management (EM)

    Draft Strategic Plan for Reducing Greenhouse Gas Emissions through Deployment of Advanced Technology DOE Releases Draft Strategic Plan for Reducing Greenhouse Gas Emissions through...

  9. Energy Department Seeks Feedback on Draft Guidance for the Hydroelectr...

    Energy Savers [EERE]

    Feedback on Draft Guidance for the Hydroelectric Production Incentive Program Energy Department Seeks Feedback on Draft Guidance for the Hydroelectric Production Incentive Program...

  10. EIS-0409: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0409: EPA Notice of Availability of the Draft Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC)...

  11. EIS-0483: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    3: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0483: EPA Notice of Availability of Draft Environmental Impact Statement Estes to Flatiron Substation...

  12. EIS-0505: EPA Notice of Availability of Supplemental Draft Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement...

  13. EIS-0447: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express...

  14. EIS-0481: EPA Notice of Availability of Draft Programmatic Environment...

    Office of Environmental Management (EM)

    EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement Engineered...

  15. EIS-0336: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and...

  16. EIS-0385: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Draft Environmental Impact Statement Site Selection for the Expansion of the Strategic Petroleum...

  17. EIS-0284: EPA Notice of Availability of the Draft Environmental...

    Energy Savers [EERE]

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0284: EPA Notice of Availability of the Draft Environmental Impact Statement Low Emission Boiler System...

  18. EIS-0396: DOE Notice of Availability of the Draft Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement EIS-0396: DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement...

  19. EIS-0472: EPA Notice of Availability of a Draft Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Draft Programmatic Environmental Impact Statement EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa,...

  20. EIS-0495: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0495: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0495: Walla Walla Basin Spring...

  1. EIS-0481: DOE Notice of Availability of Draft Programmatic Environment...

    Energy Savers [EERE]

    DOE Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: DOE Notice of Availability of Draft Programmatic Environmental Impact Statement Engineered...

  2. EIS-0419: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact Statement Whistling Ridge Energy...

  3. EA-1919: Notice of Availability of a Draft Programmatic Environmental...

    Energy Savers [EERE]

    Availability of a Draft Programmatic Environmental Assessment EA-1919: Notice of Availability of a Draft Programmatic Environmental Assessment Recycling of Scrap Metals Originating...

  4. EIS-0491: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    1: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0491: EPA Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction...

  5. EIS-0459: EPA Notice of Availablity for the Draft Programmatic...

    Energy Savers [EERE]

    for the Draft Programmatic Environmental Impact Statement EPA announced the availability of DOE's Hawaii Clean Energy Draft Programmatic EIS. EIS-0459-EPA-NOA-2014.pdf More...

  6. EA-1566: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Assessment EA-1566: DOE Notice of Availability of the Draft Environmental Assessment Proposed Infrastructure Improvements for...

  7. EIS-0400: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Draft Environmental Impact Statement EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement Grandby Pumping Plant Switchyard Windy Gap Substation...

  8. EIS-0472: DOE Notice of Availability of a Draft Programmatic...

    Energy Savers [EERE]

    DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement...

  9. EIS-0435: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0435: EPA Notice of Availability of the Draft Environmental Impact Statement Modification of the Groton Generation Station Interconnection...

  10. EIS-0441: Amended Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amended Notice of Availability of a Draft Environmental Impact Statement EIS-0441: Amended Notice of Availability of a Draft Environmental Impact Statement Mohave County Wind Farm...

  11. EIS-0451: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    1: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0451: EPA Notice of Availability of a Draft Environmental Impact Statement Hooper Springs Transmission...

  12. EIS-0414: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement...

  13. EIS-0375: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    5: DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement Disposal of...

  14. Draft Nevada National Security Site Environmental Impact Statement...

    Office of Environmental Management (EM)

    Draft Nevada National Security Site Environmental Impact Statement Released Draft Nevada National Security Site Environmental Impact Statement Released July 25, 2011 - 12:00pm...

  15. Public Review Draft: A Method for Assessing Carbon Stocks, Carbon

    E-Print Network [OSTI]

    Public Review Draft: A Method for Assessing Carbon Stocks, Carbon Sequestration, and Greenhouse, and Zhu, Zhiliang, 2010, Public review draft; A method for assessing carbon stocks, carbon sequestration

  16. The Department of Energy Releases Draft of Cybersecurity Risk...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment (September 2011) The Department of Energy Releases Draft of Cybersecurity Risk...

  17. New Draft of Cybersecurity Risk Management Process (RMP) Guideline...

    Broader source: Energy.gov (indexed) [DOE]

    New Draft of Cybersecurity Risk Management Process (RMP) Guideline Now Available for Public Comment (March 2012) New Draft of Cybersecurity Risk Management Process (RMP) Guideline...

  18. Uranium Leasing Program Draft PEIS Public Comment Period Extended...

    Broader source: Energy.gov (indexed) [DOE]

    Uranium Leasing Program Draft PEIS Public Comment Period Extended to May 31, 2013 Draft ULPEIS comment extension community notification041813 (3).pdf More Documents & Publications...

  19. EIS-0481: EPA Notice of Availability of Draft Programmatic Environment...

    Energy Savers [EERE]

    481: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement...

  20. EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact...

    Office of Environmental Management (EM)

    Draft Supplemental Programmatic Environmental Impact Statement EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement This Supplemental DEIS evaluates the...

  1. Nevada Site Office Invites Public to Participate in Draft Nevada...

    Office of Environmental Management (EM)

    Site Office Invites Public to Participate in Draft Nevada National Security Site Environmental Impact Statement Hearings Nevada Site Office Invites Public to Participate in Draft...

  2. Draft SPD SEIS Master Reference List | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Policy Act (NEPA) NEPA Reading Room Surplus Plutonium Disposition Supplemental Environmental Impact Statement Draft SPD SEIS Master Reference List Draft SPD SEIS Master...

  3. Draft Addendum to Environmental Review Documents Concerning Exports...

    Energy Savers [EERE]

    Draft Addendum to Environmental Review Documents Concerning Exports of Natural Gas from the United States Draft Addendum to Environmental Review Documents Concerning Exports of...

  4. DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report: Revision 2 DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee Report: Revision 2 Energy storage plays a vital role in all forms of business and affects the...

  5. EIS-0250: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain (July 1999)

  6. Dampers for Natural Draft Heaters: Technical Report

    E-Print Network [OSTI]

    Lutz, James D.

    2009-01-01T23:59:59.000Z

    Oil? Fired Residential Water Heaters. Berkeley Heights, Newof Residential Gas Water Heaters. Chicago, IL, Gas ApplianceDampers for Natural Draft Water Heaters: Technical Report.

  7. Microsoft Word - Draft Comprehensive Evaluation News Release...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    208-378-5101 Draft report from Federal agencies shows gains for Columbia River Basin fish Portland, Ore. - Federal agencies and their partners outlined today five years of...

  8. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 85% Cleanup EVM represents Earned Value Management. FY2011 Second Quarter Overall Contract and Project Management Improvement...

  9. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 Fourth Quarter Overall Contract and Project Management Improvement...

  10. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 First Quarter Overall Contract and Project Management Performance...

  11. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 89% Cleanup EVM represents Earned Value Management. FY2011 Third Quarter Overall Contract and Project Management Improvement...

  12. EA-1960: Draft Environmental Assessment | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S.ContaminationJuly 2011DDelphiFEA-2013.pdfBased onFinalLine,DOE issued|draft EA

  13. Griffith Energy Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    1999-04-02T23:59:59.000Z

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  14. Planning and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

  15. Draft Environmental Assessment on the Remote-handled Waste Disposition

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraft ResourceAdvice:Project

  16. 1 This is a draft solicitation; comments are due: 9/17/12 at 3 PM. DRAFT Solicitation

    E-Print Network [OSTI]

    Subject Area - Hydrogen Fuel Infrastructure SOLICITATION-DRAFT http.......................................................... 7 C. RENEWABLE HYDROGEN SET

  17. West Virginia Smart Grid Implementation Plan (WV SGIP) Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WV DoE-NRCCE-APERC DRAFT February 16, 2009 1 West Virginia Smart Grid Implementation Plan (WV SGIP) Project APERC Report on Customer Complaints to WV PSC about Electric Power...

  18. Nuclear Energy Research Initiative Project No. 02 103 Innovative Low Cost Approaches to Automating QA/QC of Fuel Particle Production Using On Line Nondestructive Methods for Higher Reliability Final Project Report

    SciTech Connect (OSTI)

    Ahmed, Salahuddin; Batishko, Charles R.; Flake, Matthew; Good, Morris S.; Mathews, Royce; Morra, Marino; Panetta, Paul D.; Pardini, Allan F.; Sandness, Gerald A.; Tucker, Brian J.; Weier, Dennis R.; Hockey, Ronald L.; Gray, Joseph N.; Saurwein, John J.; Bond, Leonard J.; Lowden, Richard A.; Miller, James H.

    2006-02-28T23:59:59.000Z

    This Nuclear Energy Research Initiative (NERI) project was tasked with exploring, adapting, developing and demonstrating innovative nondestructive test methods to automate nuclear coated particle fuel inspection so as to provide the United States (US) with necessary improved and economical Quality Assurance and Control (QA/QC) that is needed for the fuels for several reactor concepts being proposed for both near term deployment [DOE NE & NERAC, 2001] and Generation IV nuclear systems. Replacing present day QA/QC methods, done manually and in many cases destructively, with higher speed automated nondestructive methods will make fuel production for advanced reactors economically feasible. For successful deployment of next generation reactors that employ particle fuels, or fuels in the form of pebbles based on particles, extremely large numbers of fuel particles will require inspection at throughput rates that do not significantly impact the proposed manufacturing processes. The focus of the project is nondestructive examination (NDE) technologies that can be automated for production speeds and make either: (I) On Process Measurements or (II) In Line Measurements. The inspection technologies selected will enable particle “quality” qualification as a particle or group of particles passes a sensor. A multiple attribute dependent signature will be measured and used for qualification or process control decisions. A primary task for achieving this objective is to establish standard signatures for both good/acceptable particles and the most problematic types of defects using several nondestructive methods.

  19. Document title: Project Document Cover Sheet Last updated: April 2007

    E-Print Network [OSTI]

    Glasgow, University of

    Environment programme 2009-2011 Enhancement (A5) projects Programme Manager Andrew McGregor Document Name Document Title Project Plan Reporting Period N/A Author(s) & project role William J Nixon, Project Manager dissemination Document History Version Date Comments 1.0 30 Apr 09 Draft for JISC Programme Manager 1.1 21 May

  20. DRAFT/PRELIMINARY MEETING AGENDA

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy, OAPMMilestone | DepartmentEA - 0942DRAFT/PRE-DECISIONAL/DO

  1. Draft Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of No53197E T ADRAFTJanuaryDominionDow PiotrAgenda Draft Agenda

  2. Draft Advice: ERDF ROD Amendment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraft ResourceAdvice: ERDF ROD

  3. Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: Validating VENT-II

    E-Print Network [OSTI]

    Rapp, Vi H.

    2014-01-01T23:59:59.000Z

    and Spillage for Natural-Draft Gas Combustion Appliances:and Spillage for Natural-Draft Gas Combustion Appliances: A

  4. Final environmental impact statement, Washington Water Power/B.C. Hydro Transmission Interconnection Project

    SciTech Connect (OSTI)

    Not Available

    1992-10-01T23:59:59.000Z

    Washington Water Power (WWP) proposes to construct and operate an electric transmission line that would connect with the electrical system of the British Columbia Hydro and Power Authority (B.C. Hydro). The project would be composed of a double-circuit, 230-kilovolt (kV) transmission line from WWP`s existing Beacon Substation located northeast of Spokane, Washington to the international border located northwest of Metaline Falls, Washington. The original Presidential permit application and associated proposed route presented in the draft environmental impact statement (DEIS) have been modified to terminate at the Beacon Substation, instead of WWP`s initially proposed termination point at the planned Marshall Substation located southwest of Spokane. A supplemental draft EIS was prepared and submitted for review to not only examine the new proposed 5.6 miles of route, but to also compare the new Proposed Route to the other alternatives previously analyzed in the DEIS. This final EIS (FEIS) assesses the environmental effects of the proposed transmission line through construction, operation, maintenance, and abandonment activities and addresses the impacts associated with the Proposed Action, Eastern Alternative, Western Alternative, Northern Crossover Alternative, Southern Crossover Alternative, and No Action Alternative. The FEIS also contains the comments received and the responses to these comments submitted on the DEIS and Supplemental DEIS.

  5. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

  6. Final environmental impact statement/report. Volume 3. Response to comments on draft environmental impact statement/report. Northeast corridor improvement project electrification: New Haven CT to Boston, MA

    SciTech Connect (OSTI)

    NONE

    1994-10-31T23:59:59.000Z

    This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by extending electric traction from New Haven, CT, to Boston, MA. This document (Volume III) of the FEIS/R presents summaries of comments received on the DEIS/R and responses to these comments.

  7. DRAFT Plan Prepared by Denali Daniels...

    Office of Environmental Management (EM)

    pring 2 015. (DRAFT) V ision S tatement By 2025, the U.S. Arctic has maximized available renewable resources by integrating micro---grid, hybrid---system technology into isolated...

  8. DRAFT COMMITTEE REPORT RENEWABLE ENERGY PROGRAM

    E-Print Network [OSTI]

    , Senate Bill 1, Consumer Education Program, renewable energy, solar thermal, photovoltaic, biomass, fuelDRAFT COMMITTEE REPORT RENEWABLE ENERGY PROGRAM 2011 ANNUAL REPORT TO THE LEGISLATURE NOVEMBER 2011 CEC3002011007CTD #12;CALIFORNIA ENERGY COMMISSION RENEWABLES COMMITTEE Carla

  9. Microsoft Word - CLWR Draft SEIS Comment

    National Nuclear Security Administration (NNSA)

    Draft Suppl emen tal Envi ron mental I mpa ct Statemen t for the Production of Tritium in a Commercial Light Water Reactor U.S. Department of Energy National Nuclear Security...

  10. PalgravePrecautionary Draft -Comments Solicited

    E-Print Network [OSTI]

    Niebur, Ernst

    PalgravePrecautionary Draft - Comments Solicited Precautionary Saving and Precautionary Wealth This is an entry for The New Palgrave Dictionary of Economics, 2nd Ed. Keywords: Precautionary saving, prudence, consumption function, buffer stock saving Archive http

  11. Draft Bioenergy Master Plan for the State of Hawaii

    E-Print Network [OSTI]

    Draft Bioenergy Master Plan for the State of Hawaii Prepared for the U.S. Department of Energy DRAFT Hawaii Bioenergy Master Plan Volume I Prepared for State of Hawaii Department of Business

  12. Release of DRAFT RFP Headquarters Reading Room Instructions/Guidelines

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Release of DRAFT RFP Headquarters Reading Room InstructionsGuidelines 1. Reading Room Points of Contact: 721 - 88, Mike Baehre, (202) 586-6575 89 - Close of Draft RFP, John...

  13. DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan

    E-Print Network [OSTI]

    DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN............................................... 38 5.5.2. Consistency with the Clean Water Act, Total Maximum Daily Loads and Existing Water Quality

  14. DOE Issues Draft Request for Proposals for Services at Carlsbad...

    Office of Environmental Management (EM)

    DOE Issues Draft Request for Proposals for Services at Carlsbad New Mexico DOE Issues Draft Request for Proposals for Services at Carlsbad New Mexico December 22, 2014 - 12:00pm...

  15. DRAFT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    .3 (January 2012) 1 Compliance with U.S. Export Control Laws, Regulations and Policies References a. Federal Acquisition Regulations (FAR) 17.6, Management and Operating Contracts...

  16. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    long period of inactivity, our region and nation are experiencing a welcome resurgence in nuclear power as utilities make plans to meet future electricity needs. In the next...

  17. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    REPORT NUCLEAR WORKFORCE SUMMIT Sponsored by the Savannah River Site Community Reuse Organization (SRSCRO) Prepared By: MAS Consultants, Inc. June 29, 2009 SRSCRO Nuclear Workforce...

  18. Draft

    Broader source: Energy.gov (indexed) [DOE]

    Energy Board WIEB), Adam Levin (Exelon Generation Company), Jim Reed (NCSL), Conrad Smith (CSG-East), Steve Sullivan (American Shortline Railroad Association),Ruth Weiner...

  19. Draft

    Broader source: Energy.gov (indexed) [DOE]

    Office), Ken Niles (WIEB), Jim Reed (NCSL), Lisa Sattler (CSG-Midwest), Conrad Smith (CSG-East), Sara Wochos (CSG-Midwest) Contractor Support: Ralph Best (BSC), Ed Davis...

  20. Draft

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Restoration," DOE New, August 8, 1991. 290. EM Weekly, May 7, 1991, p. 3. 291. "Fresh Infusion of Cleanup Funds Cause.. Dufty to Recant Budget Gripe," Inside Energy (April 22,...

  1. DRAFT

    National Nuclear Security Administration (NNSA)

    letters were sent to the Wisconsin State Historic Preservation Office and the U.S. Fish and Wildlife Service. 1.5 PUBLIC INVOLVEMENT NNSA sent notification letters to the...

  2. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    looming shortage this way: "The U. S. nuclear design, manufacturing and construction industry has withered on the vine." It is a critical skills gap that, left unfilled, could...

  3. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Annual Report on Technology Partnering Activities at National Laboratories and Other Departmental Facilities for Fiscal Year 2001 As Required by 15 USC 3710(f)...

  4. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    could serve as a deterrent to any other nation's ambition to launch a broad nuclear attack. Today, SRS accomplishments continue to stand at the core of our nation's nuclear...

  5. DRAFT

    Energy Savers [EERE]

    economy is diverse. In 2009, the government and government enterprises, retail trade, and health care industries were the largest sectors, collectively, contributing about 32...

  6. DRAFT

    Office of Environmental Management (EM)

    Outline of Remarks of John Andrew, Assistant Deputy Director California Department of Water Resources (DWR) at the Quadrennial Energy Review Public Meeting June 19, 2014 San...

  7. Draft

    Broader source: Energy.gov (indexed) [DOE]

    of the reference hyperlinking and the references available on T- REX. Currently, Nancy Bennett from T-REX has nine documents directly available on T-REX. The NRC documents may need...

  8. Draft

    Broader source: Energy.gov (indexed) [DOE]

    and Radiation Monitoring", an additional topic to be included is to address train car monitoring and packages. Michele will add this additional topic for Activity 3 on the...

  9. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi SitePARTOffice ofHaleREPORT NUCLEAR WORKFORCE SUMMIT

  10. DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi SitePARTOffice ofHaleREPORT NUCLEAR WORKFORCE

  11. DRAFT

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy, OAPMMilestone | DepartmentEA - 0942 ELandmark |Transportation

  12. DRAFT

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy, OAPMMilestone | DepartmentEA - 0942 ELandmark |Transportation0,

  13. Draft

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0andEnergyGlobal NuclearofCommunication |Does YourDr. Monica C. Closing

  14. draft

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof Energy 2, 2015Visiting Strong,Women @JoinEnergyappearancecrd title6

  15. DRAFT

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russianvolunteer |At.<ENDMENT/MODIFICATION NO.TemplateTons

  16. DRAFT

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA Approved: 5-13-14Russianvolunteer |At.<ENDMENT/MODIFICATION

  17. DRAFT

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO OverviewAttachments461-93 February 1993DOE/EIS-0350-SA-2Department ofJordan/Malheur.3

  18. DRAFT

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1 DEPARTMENTSeptember 27,September 24, 2002TheEnergy. S ..3

  19. Draft

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher Fecko

  20. Appendix 22 Draft Nutrient Management Plan and Total Maximum Daily

    E-Print Network [OSTI]

    Appendix 22 Draft Nutrient Management Plan and Total Maximum Daily Load for Flathead Lake, Montana. #12;11/01/01 DRAFT i October 30, 2001 Draft Nutrient Management Plan and Total Maximum Daily Load..............................................................................................................................2-11 SECTION 3.0 APPLICABLE WATER QUALITY STANDARDS

  1. Northeast corridor improvement project draft environmental impact statement/report for electrification of Northwest Corridor, New Haven, CT. To Boston, MA. Volume 1. Final report, September 1992-September 1993

    SciTech Connect (OSTI)

    Not Available

    1993-09-01T23:59:59.000Z

    The impacts of extending electrification on the National Railroad Passenger Corporation's (Amtrak) Northeast Corridor (NEC) from New Haven, Connecticut to Boston, Massachusetts are of direct concern to the Federal Railroad Administration (FRA). To improve rail service and increase ridership between New York and Boston, Amtrak proposes the electrification of the NEC main line between New Haven, CT and Boston, MA using an overhead 2 X 25,000 volt - 60 hertz power system. This volume considers impacts on the Human and Natural Environment utilizing guidance as outlined in CFR Part 1500, Council on Environmental Quality, Regulations for Implementing the Procedural Requirements of NEPA as amended and the Massachusetts Environmental Policy Act (MEPA) regulations (301 CMR 11:00). Impacts analyzed include changes in the natural environment (air quality, noise and vibration, energy, electromagnetic fields, natural resources, hazardous materials and visual/aesthetics), changes in the social environment (land use and recreation, transportation and traffic), impacts on historic and archaeological sites, changes in transit service and patronage, associated changes in highway and airport congestion, capital costs, operating and maintenance costs, and financial implications. Impacts are identified both for the proposed construction period and for the long-term operation of the alternatives.

  2. EA-1551: Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line

    Broader source: Energy.gov [DOE]

    DOE started to prepare, jointly with the Montana Department of Environmental Quality (MDEQ), an EA that would also serve as a state EIS. The document would evaluate the potential environmental impacts of a proposed international transmission line that would cross the U.S.-Canada border in northwest Montana. Based on comments received on the DOE Draft EA/MDEQ Draft EIS, DOE cancelled preparation of the EA and announced preparation of DOE/EIS-0399 (of the same title).

  3. Microsoft Word - Draft Advanced Fossil Solicitation Final Draft...

    Broader source: Energy.gov (indexed) [DOE]

    Guarantee Program decision-making procedures to ensure that a project's environmental impacts are properly considered. 1. There are three possible levels of NEPA for an...

  4. Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    TR-202 October 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 – Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery... Canals, and On-Farm Delivery-Site Meters M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp John R. Ellis Texas Water Resources Institute Texas A&M University TR-202 October 2002 Economic and Conservation...

  5. Independent Verification Survey Report for the Offsite Portion of the Potential Release Site-7 Abandoned Sanitary Line, Miamisburg Closure Project, Miamisburg, Ohio

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-08-15T23:59:59.000Z

    The ORISE objective was to confirm that the remedial action process implemented by the contractor was in accordance with the PRS-7 Work Package. Following removal of the sanitary line, the soil beneath the line would be sampled to determine if remediation was required (ARC 2007a).

  6. Draft TTW 5-8-12.cdr

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraftDraft-8, 2012 WIPP Quick

  7. Draft dry year tools (generation/planning)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraftDraft-8, 2012

  8. EA-1860: Richland Renewable Energy Waste-to-Energy Project, Richland, Wisconsin

    Broader source: Energy.gov [DOE]

    DOE is preparing a draft Environmental Assessment to analyze the potential environmental impacts of the proposed construction and operation of a new wastewater treatment facility and the alternative of not implementing this project.

  9. EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming.

  10. NEW SOLAR HOMES PARTNERSHIP DRAFT GUIDEBOOK

    E-Print Network [OSTI]

    NEW SOLAR HOMES PARTNERSHIP DRAFT GUIDEBOOK Fourth Edition SEPTEMBER 2011 CEC3002011006CMD 7, 2010. #12;i ABSTRACT The New Solar Homes Partnership (NSHP) Program is part of a statewide solar program known as the California Solar Initiative (CSI). The NSHP provides financial incentives

  11. ENGINEERING EDUCATION IN INDIA Draft Final report

    E-Print Network [OSTI]

    Banerjee, Rangan

    ENGINEERING EDUCATION IN INDIA Draft Final report Rangan Banerjee Vinayak P. Muley Sponsored by Observer Research Foundation Energy Systems Engineering, IIT Bombay Powai, Mumbai ­ 400076 September 14, 2007 #12;i Preface In India engineering is one of the preferred choices for good students at the 10

  12. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    California Energy Commission DRAFT STAFF REPORT 2011 NATURAL GAS MARKET ASSESSMENT: OUTLOOK or adequacy of the information in this report. #12;#12;i ACKNOWLEDGEMENTS The natural gas market is part markets. This report's estimates of future natural gas market activity and prices are based

  13. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    California Energy Commission DRAFT STAFF REPORT THE ELECTRIC PROGRAM INVESTMENT CHARGE, and market facilitation for clean energy technologies. The CPUC approved a total of $162 million annually for the program for the four administrators ­ the Energy Commission, Pacific Gas and Electric Company (PG

  14. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    . While the Energy Commission cannot require independent transmission developers to respond to these dataCalifornia Energy Commission DRAFT STAFF REPORT FORMS AND INSTRUCTIONS FOR ELECTRIC TRANSMISSIONRELATED DATA Prepared in Support of the 2011 Integrated Energy Policy Report NOVEMBER 2010 CEC

  15. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    . Steven Mac and Irene Salazar provided the historic consumption data. Mark Ciminelli provided a newCalifornia Energy Commission DRAFT STAFF REPORT UPDATED CALIFORNIA ENERGY DEMAND FORECAST 20112022 MAY 2011 CEC2002011006SD #12;CALIFORNIA ENERGY COMMISSION Chris Kavalec Principal Author Chris

  16. Reverse Top-k Queries [DRAFT VERSION

    E-Print Network [OSTI]

    Reverse Top-k Queries [DRAFT VERSION] Akrivi Vlachou # , Christos Doulkeridis # , Yannis Kotidis become essential for many applications that return to the user only the top-k objects based on the individual user's preferences. Top-k queries have been mainly studied from the perspective of the user

  17. RESIDENT ACADEMIC MENTOR DRAFT JOB DESCRIPTION

    E-Print Network [OSTI]

    Caughman, John

    1 RESIDENT ACADEMIC MENTOR DRAFT JOB DESCRIPTION 2015-2016 ACADEMIC YEAR The Resident Academic Mentor (RAM) is a member of the Residence Life team. The RAM is responsible for fostering a supportive, information and resources to residents. Resident Academic Mentors will provide valuable experiences

  18. Draft Management Plan Upper Snake Province

    E-Print Network [OSTI]

    .......................................................................................4-5 Consistency with Idaho's Water Quality Management Plan...........................4-5 303(dDraft Management Plan Upper Snake Province Submitted To The Northwest Power and Conservation Quality Anti-Degradation Policy (39-3603) ............................................4-8 ESA and CWA

  19. (Preview Draft) Chapter 3. Stocks and Flows

    E-Print Network [OSTI]

    Ford, Andrew

    the state over time. It will take some time for the flows to have their effect on the stocks, so the stocks(Preview Draft) Chapter 3. Stocks and Flows: The Building Blocks of System Dynamics Models The best way to construct a model is to start with the stocks, add the flows and then use converters to explain

  20. NOTICE OF PREPARATION: DRAFT ENVIRONMENTAL IMPACT REPORT

    E-Print Network [OSTI]

    Sze, Lawrence

    NOTICE OF PREPARATION: DRAFT ENVIRONMENTAL IMPACT REPORT DATE: September 25, 2013 TO: Responsible (Trustees) will be the lead agency for the preparation of an environmental impact report (EIR to: CSU Board of Trustees c/o Nicole Carter, Senior Planner SWCA Environmental Consultants 1422

  1. California Energy Commission DRAFT STAFF REPORT

    E-Print Network [OSTI]

    Saving Energy in Existing Buildings and Achieving a ZeroNetEnergy Future JULY 2011 CEC4002011007SD Commission staff's draft recommendations for achieving zero-net-energy residential buildings by 2020, and zero-net-energy commercial buildings by 2030. Doing so will require enormous efficiency improvements

  2. FINAL DRAFT VI. Application 3: Recruitment Prediction

    E-Print Network [OSTI]

    Miller, Tom

    FINAL DRAFT 106 VI. Application 3: Recruitment Prediction Contributors: S. Sarah Hinckley, Bernard Megrey, Thomas Miller Definition What do we mean by recruitment prediction? The first thing to consider in defining this term is the time horizon of the prediction. Short-term predictions mean the use of individual

  3. Draft NISTIR 80061 NIST Cloud Computing2

    E-Print Network [OSTI]

    Draft NISTIR 80061 NIST Cloud Computing2 Forensic Science Challenges NIST Cloud Computing Forensic Computing11 Forensic Science Challenges 12 NIST Cloud Computing Forensic Science Working Group13 Information challenges77 faced by experts when responding to incidents that have occurred in a cloud-computing ecosystem

  4. Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: Validating VENT-II

    E-Print Network [OSTI]

    Rapp, Vi H.

    2014-01-01T23:59:59.000Z

    for Natural-Draft Gas Combustion Appliances: Validatingfor Natural-Draft Gas Combustion Appliances: A Validation ofs ability to predict combustion gas spillage events due to

  5. EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental...

    Office of Environmental Management (EM)

    DOE Notice of Availability of the Draft Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings EIS-0236-S4: DOE Notice of Availability of the Draft...

  6. EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental...

    Office of Environmental Management (EM)

    DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0283-S2: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement...

  7. EA-1792-S1: DOE Notice of Availability of the Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment EA-1792-S1: DOE Notice of Availability of the Draft Supplemental Environmental Assessment DOE's...

  8. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...

    Office of Environmental Management (EM)

    -S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact...

  9. EIS-0288-S1: EPA Notice of Availability of Draft Supplemental...

    Energy Savers [EERE]

    8-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement EIS-0288-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement...

  10. EIS-0288-S1: EPA Notice of Availability of Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    288-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement EIS-0288-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement...

  11. DRAFT Carbon Storage R&D Project Review Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grace M. Bochenek, Ph.D., Director, National Energy Technology Laboratory 8:20 a.m. DOE Clean Coal R & D Program Mark Ackiewicz, Office of Fossil Energy, U.S. Department of Energy...

  12. Northern Wind Project Draft Environmental Assessment DOE/EA-1902

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in ManyDepartment of Energy NorthB O N N E V I L L E P O W E R

  13. Draft Environmental Impact Statement- Crooked River Valley Rehabilitation Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The Future of Bad CholesteroliManage Presentation3 DATE: March 14,62008 U.S.

  14. Clark Fork River Delta Restoration Project Draft Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: Theof"Wave the White Flag" | DepartmentCladding AttachmentDepartmentB O

  15. Draft Advanced Fossil Energy Projects Solicitation Public Comments |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonna

  16. DRAFT 2012 DOE Project Management Workshop Agenda | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0and Transparency,8-9612-985-2007Supplemental Environmental67Idaho. S .

  17. DRAFT Carbon Storage R&D Project Review Meeting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration wouldDECOMPOSITION OFSupplemental Technology Testing DownselectCarbon Storage

  18. I-5 Corridor Reinforcement Project Draft EIS 33-1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh School footballHydrogen andHypernuclei in Hall C High2 - _Updates

  19. Construction and startup experience for Milliken FGD Retrofit Project

    SciTech Connect (OSTI)

    Harvilla, J.; Mahlmeister, M. [New York State Electric and Gas Corp., Binghamton, NY (United States); Buchanan, T.; Jackson, C. [Parsons Power Group, Inc., Reading, PA (United States); Watts, J. [USDOE, Pittsburgh Energy Technology Center, PA (United States)

    1996-12-01T23:59:59.000Z

    Under Round 4 of the U.S. Department of Energy`s Clean Coal Technology program, New York State Electric & Gas Corp. (NYSEG), in partnership with Saarbereg-Stebbins Engineering and Manufacturing Company, has retrofitted a formic acid enhanced forced oxidation wet limestone scrubber on Units 1 & 2 at the Milliken Steam Electric Station. Units 1 & 2 are 1950`s vintage Combustion Engineering tangentially fired pulverized coal units which are rated at nominal 150 MW each and operate in balanced draft mode. The FGD system for Unit 2 was placed into operation in January 1995 and the Unit 1 system in June, 1995. The project incorporates several unique aspects including low pH operation, a ceramic tile-lined cocurrent/countercurrent, split module absorber, a wet stack supported on the roof of the FGD building, and closed loop, zero liquid discharge operation producing commercial grade gypsum, and calcium chloride brine. The project objectives include 98% SO{sub 2} removal efficiency while burning high sulfur coal, the production of marketable byproducts to minimize solid waste disposal, zero wastewater discharge and space-saving design. The paper provides a brief overview of the project design, discusses construction and startup issues and presents early operating results. Process capital cost and economics of this design, procure and construct approach are reviewed relative to competing technologies.

  20. WESTERN AREA POWER ADMINISTRATION COMMENTS/CHANGES TO DRAFT RMR...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WESTERN AREA POWER ADMINISTRATION COMMENTSCHANGES TO DRAFT RMR PA FOR ROUTINE MAINTENANCE DATED 101613 (REQUESTED ON DEC 18, 2014; EXTENDED THROUGH MARCH 10, 2014) AgencyTribe...

  1. EIS-0469: EPA Notice of Availability of a Draft Environmental...

    Energy Savers [EERE]

    EPA Notice of Availability of a Draft Environmental Impact Statement Wilton IV Wind Energy Center; Burleigh County, North Dakota This EIS will evaluate the environmental...

  2. Microsoft Word - Draft SA Press Release_March 2011_jb

    National Nuclear Security Administration (NNSA)

    PUBLIC INFORMATIONAL MEETINGS TO BE HELD ON A DRAFT SUPPLEMENT ANALYSIS OF THE SITE-WIDE ENVIRONMENTAL IMPACT STATEMENT FOR CONTINUED OPERATION OF LAWRENCE LIVERMORE NATIONAL...

  3. Microsoft Word - Draft SA Press Release_March 2011_jb

    National Nuclear Security Administration (NNSA)

    March 28, 2011 (925) 422-2567 DRAFT SUPPLEMENT ANALYSIS OF THE SITE-WIDE ENVIRONMENTAL IMPACT STATEMENT FOR CONTINUED OPERATION OF LAWRENCE LIVERMORE NATIONAL LABORATORY AVAILABLE...

  4. DOE Draft Standard, Development and Use of Probabilistic Risk...

    Energy Savers [EERE]

    Standard, Development and Use of Probabilistic Risk Assessments in Department of Energy Nuclear Safety Applications, 1210 DOE Draft Standard, Development and Use of...

  5. EIS-0403-S1: Supplement to the Draft Programmatic Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The...

  6. Draft Site-Wide Environmental Impact Statement Nevada References...

    National Nuclear Security Administration (NNSA)

    Blog Home About Us Our Operations NNSA Office of General Counsel National Environmental Policy Act (NEPA) NEPA Reading Room Draft Site-Wide Environmental Impact...

  7. CEQ Issues Revised Draft Guidance on Consideration of Greenhouse...

    Broader source: Energy.gov (indexed) [DOE]

    revised draft guidance on consideration of greenhouse gas (GHG) emissions and the effects of climate change in National Environmental Policy Act (NEPA) reviews on December 18,...

  8. Energy Department Seeks Additional Feedback on Draft Guidance...

    Broader source: Energy.gov (indexed) [DOE]

    implementation of Section 242 of the Energy Policy Act of 2005, the "Hydroelectric Production Incentive Program." Public comments on the initial Section 242 Draft Guidance were...

  9. Public Invited to Comment on Draft Environmental Assessment for...

    Office of Environmental Management (EM)

    Environmental Assessment for the Resumption of Transient Testing of Nuclear Fuels and Materials Public Invited to Comment on Draft Environmental Assessment for the Resumption of...

  10. assumptions draft study: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Websites Summary: 1 41804 First Draft 1 April 2003 Plate Tectonics ; The General Theory The Complex Earth is difficult to overturn. After more than 20 years some implications...

  11. Elsevier Editorial System(tm) for BBA -Bioenergetics Manuscript Draft

    E-Print Network [OSTI]

    Elsevier Editorial System(tm) for BBA - Bioenergetics Manuscript Draft Manuscript Number: BBABIO-14 revised paper will be acceptable for publication in BBA Bioenergetics. Yours sincerely Prof. Jean

  12. EIS-0425: EPA Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Notice of Availability of Draft Environmental Impact Statement for the Mid-Columbia Coho Restoration Program, DOEEIS-0425 (June 2011 - 76 FR 37111) More Documents & Publications...

  13. EIS-0379: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Lincoln County, Montana DOEEIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of...

  14. National Electric Transmission Congestion Study - Draft for Public...

    Office of Environmental Management (EM)

    On August 19, 2014, the Department issued a Federal Register Notice announcing the availability of a draft of its National Electric Transmission Congestion Study for public...

  15. EIS-0375: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    DOEEIS-0375, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level...

  16. EIS-0374: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Day 500-kV Substation. DOEEIS-0374, Environmental Protection Agency, Notice of Availability of the Department of Energy, Bonneville Power Administration, Draft Environmental...

  17. EIS-0407: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Federal Funding, Located near the City Hugoton, Stevens County, KS Notice of Availability of the Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery...

  18. EIS-0404: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    DEIS-2009.pdf More Documents & Publications EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0382: EPA Notice of Availability of the Final...

  19. EIS-0245: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Impact Statement EIS-0245: Draft Environmental Impact Statement Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington...

  20. EIS-0355: EPA Notification of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab...

  1. EIS-0355: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab...

  2. California Energy Commission STAFF DRAFT

    E-Print Network [OSTI]

    emissions, reduce petroleum use, improve air quality, and stimulate the sustainable production and use projects that provide for "a measurable transition from the nearly exclusive use of petroleum fuels to a diverse portfolio of alternative fuels that meet petroleum reduction goals and alternative fuel use goals

  3. Characterization of Bead Trajectories Through the Draft Tube of a Turbine Physical Model.

    SciTech Connect (OSTI)

    Weiland, Mark A.; Mueller, Robert P.; Carlson, Thomas J.; Deng, Zhiquan; McKinstry, Craig A.

    2005-02-18T23:59:59.000Z

    Using high-speed video imaging, trajectories, and kinematics of beads passing below the turbine runner and through the draft tube region of the 1:25 scale model of a single turbine unit from Bonneville Dam powerhouse 1 were collected from May 6-9, 2003 at U.S. Army Corps of Engineers (USACE) Environmental Research and Development Center (ERDC) in Vicksburg, MS. An individual camera was used to produce 2-dimensional trajectories and paired cameras with overlapping fields of view were used to produce 3-dimension trajectories of near neutrally buoyant beads as they passed through the draft tube region of the turbine model. Image data was collected at two turbine operating levels, lower 1% efficiency and maximum rated output for beads released mid-depth into the turbine intake from each of the three gatewell slots. The purpose of this study was to determine the feasibility of using video imaging to track the trajectories of beads through the draft tube of turbine physical models and from the trajectories calculate the kinematics of the bead trajectory and the beads response to turbulence in the model. This project is part of a research program supported by the U.S. Department of Energy Advanced Hydropower Turbine System Program (AHTS) who's goal is to increase the operating potential of hydroelectric facilities while also reducing the reducing the risk of injury and death to fish as they pass through the turbines.

  4. Possible Draft HAB Comments for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah Project Office Press Releases Portsmouth/Paducah: Preliminary issue

  5. Draft RSO Deeming Guidance Document 1 DRAFT RSO Deeming Guidance Development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraftDraft- RAP/PICV0,RSO

  6. EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  7. EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  8. associates draft test: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    associates draft test First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 The Drafting Technology Program...

  9. DRAFT NISTIR 7628 Revision 1 Guidelines for Smart Grid Cybersecurity

    E-Print Network [OSTI]

    DRAFT NISTIR 7628 Revision 1 Guidelines for Smart Grid Cybersecurity: Vol. 2, Privacy and the Smart Grid The Smart Grid Interoperability Panel ­ Smart Grid Cybersecurity Committee #12;DRAFT NISTIR 7628 Revision 1 Guidelines for Smart Grid Cybersecurity: Vol. 2, Privacy and the Smart Grid The Smart Grid

  10. NORTHWEST ENERGY EFFICIENCY TASKFORCE DEC. 31, 2008 DRAFT REPORT

    E-Print Network [OSTI]

    NORTHWEST ENERGY EFFICIENCY TASKFORCE DEC. 31, 2008 DRAFT REPORT APPENDICES Appendix A: Work Group Technology Innovation Roadmapping Invitation 67 Appendix C: Work Group 3 (High Impact Energy Efficiency Initiatives) C-1: Draft Report and Recommendations 68 C-2: Regional Energy Efficiency Program Forum 72 C-3

  11. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-02-01T23:59:59.000Z

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  12. Draft Report Development of Model Curriculum in Renewable Energy

    E-Print Network [OSTI]

    Banerjee, Rangan

    Draft Report On Development of Model Curriculum in Renewable Energy Energy Systems Engineering, Indian Institute of Technology Bombay Powai, Mumbai ­ 400 076 August 2003 #12;Draft Renewable Energy energy systems for the future, it is necessary to incorporate renewable energy in the traditional

  13. DRAFT Fifteenmile Subbasin Assessment 3. Fifteenmile Subbasin Assessment

    E-Print Network [OSTI]

    DRAFT Fifteenmile Subbasin Assessment 3. Fifteenmile Subbasin Assessment DRAFT May 25 2004 Compiled. Fifteenmile Subbasin Assessment 1 Assessment Overview 1 3.1. Subbasin Overview 2 3.1.1. General Description 2.4. Limiting Environmental Factors and Populations of Aquatic Species 39 3.4.1. Winter Steelhead in Fifteenmile

  14. Draft Minutes _ 5 February 2013 LIBRARY STAFF CONSULTATIVE COMMITTEE

    E-Print Network [OSTI]

    THE AUSTRALIAN NATIONAL UNIVERSITY DRAFT MINUTES A meeting of the Library Staff Consultative Committee was held of excellence in research and education and the University's role as a national policy resource. The planDraft Minutes _ 5 February 2013 LIBRARY STAFF CONSULTATIVE COMMITTEE DIVISION OF INFORMATION

  15. Draft Environmental Impact Report LAWRENCE BERKELEY NATIONAL LABORATORY

    E-Print Network [OSTI]

    Lee, Jason R.

    . LBNL Transportation Demand Management Plan F-1 G. U.S. Department of Energy Policy StatementDraft Environmental Impact Report LAWRENCE BERKELEY NATIONAL LABORATORY LONG-RANGE DEVELOPMENT PLAN Seattle Tampa 201074 Draft Environmental Impact Report LAWRENCE BERKELEY NATIONAL LABORATORY LONG

  16. accident draft resolution: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    accident draft resolution First Page Previous Page 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Next Page Last Page Topic Index 1 CLASNote95Draft Spatial...

  17. Draft Environmental Impact Statement for the Disposal of Greater-Than-Class

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraft ResourceAdvice:ProjectC

  18. Microsoft Word - Draft.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |IsLove Your1 SECTION A. Project Title:404 2.1 Advanced Tokamak

  19. Puget Sound Hatcheries Draft EIS S-1 July 2014 Draft Environmental Impact Statement on Two Joint State and Tribal

    E-Print Network [OSTI]

    Puget Sound Hatcheries Draft EIS S-1 July 2014 Draft Environmental Impact Statement on Two Joint State and Tribal Resource Management Plans for Puget Sound Salmon and Steelhead Hatchery Programs Introduction Salmon and steelhead have been produced in Puget Sound hatcheries since the late 1800s

  20. Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Preliminary

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    is the only source of water for the City of Eagle Pass and the towns of Quemado and El Indio. Recent agricultural water use during calendar years 1994-1998 for the District has ranged from 42,677 ac-ft to 105,893 ac-ft, with the five-year average at 71,657 ac... savings forthcoming from the total project are estimated, using amortization procedures, to be 8,084 ac-ft of water per year and 2,041,095,338 BTUs (598,211 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated...

  1. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    SciTech Connect (OSTI)

    NONE

    1993-07-01T23:59:59.000Z

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan.

  2. Next Generation On-Line Dynamic Security Assessment

    E-Print Network [OSTI]

    Next Generation On-Line Dynamic Security Assessment Parts III and IV Final Project Report Power;Next Generation On-Line Dynamic Security Assessment Parts III and IV Final Project Report Parts III Research Center (PSERC) research project titled "Next Generation On-Line Dynamic Security Assessment

  3. Biomass 2014 Draft Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergyandapproximately 10 wt%inandWBS 1.2.3.31Biomass Draft

  4. Property:Draft(m) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to: navigation,PillarPublicationType JumpDOEInvolve Jumpallowed values for thisDraft(m) Jump to:

  5. Draft Advanced Fossil Solicitation | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft Advanced Fossil

  6. Draft FY 2012 Agency Financial Report

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3:C Low-Level

  7. Draft PEI Calculator | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T,Office of Policy,Policy ActDetroit7471 FederalDonnaDraft3:CPublic

  8. Draft Supplement Analysis | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0andEnergyGlobal NuclearofCommunication |Does YourDr. Monica C.Draft

  9. Use of Optical and Imaging Techniques for Inspection of Off-Line Joule-Heated Melter at the West Valley Demonstration Project

    SciTech Connect (OSTI)

    Plodinec, M. J.; Jang, P-R; Long, Z.; Monts, D. L.; Philip, T.; Su, Y.

    2003-02-25T23:59:59.000Z

    The West Valley melter has been taken out of service. Its design is the direct ancestor of the current melter design for the Hanford Waste Treatment Plant. Over its eight years of service, the West Valley melter has endured many of the same challenges that the Hanford melter will encounter with feeds that are similar to many of the Hanford double shell tank wastes. Thus, inspection of the West Valley melter prior to its disposal could provide valuable--even crucial--information to the designers of the melters to be used at the Hanford Site, particularly if quantitative information can be obtained. The objective of Mississippi State University's Diagnostic Instrumentation and Analysis Laboratory's (DIAL) efforts is to develop, fabricate, and deploy inspection tools for the West Valley melter that will (i) be remotely operable in the West Valley process cell; (ii) provide quantitative information on melter refractory wear and deposits on the refractory; and (iii) indicate areas of heterogeneity (e.g., deposits) requiring more detailed characterization. A collaborative arrangement has been established with the West Valley Demonstration Project (WVDP) to inspect their melter.

  10. Draft 1992 Resource Program : Technical Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-01-01T23:59:59.000Z

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA's Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA's Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  11. Draft 1992 Resource Program : Technical Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-01-01T23:59:59.000Z

    The 1992 Resource Program will propose actions to meet future loads placed on the Bonneville Power Administration (BPA). It will also discuss and attempt to resolve resource-related policy issues. The Resource Program assesses resource availability and costs, and analyzes resource requirements and alternative ways of meeting those requirements through both conservation and generation resources. These general resource conclusions are then translated to actions for both conservation and generation. The Resource Program recommends budgets for the Office of Energy Resources for Fiscal Years (FY) 1994 and 1995. BPA`s Resource Program bears directly on an important BPA responsibility: the obligation under the Northwest Power Act{sup 3} to meet the power requirements of public and private utility and direct service industrial (DSI) customers according to their contractual agreements. BPA`s Draft 1992 Resource Program is contained in four documents: (1) 1992 Resource Program Summary; (2) Technical Report; (3) Technical Assumptions Appendix; and, (4) Conservation Implementation Plan. This volume is the Draft 1992 Resource Program Technical Report, a comprehensive document that provides supporting data and analyses for Resource Program recommendations.

  12. RM Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rate-setting functions were integrated in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line....

  13. Navajo Electrification Demonstraiton Project

    SciTech Connect (OSTI)

    Larry Ahasteen, Project Manager

    2006-07-17T23:59:59.000Z

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  14. Microsoft Word - Inspections Subgroup Minutes_022306_Draft _2...

    Broader source: Energy.gov (indexed) [DOE]

    to 3:30 p.m. CST DRAFT Group Co-Chairs: Tim Runyon (State of Illinois) and Carlisle Smith (State of Ohio) Participants: Lisa Janairo (CSG), Kevin Blackwell (DOT), Brent Kiser...

  15. EIS-0458: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Notice of Availability of the Draft Environmental Impact Statement and Public Hearing for a Proposed Federal Loan Guarantee To Support Construction and Start-Up of the Topaz Solar...

  16. CEQ Extends Comment Period on Revised Draft Guidance on Consideration...

    Broader source: Energy.gov (indexed) [DOE]

    comment period on its revised draft guidance on consideration of greenhouse gas (GHG) emissions and the effects of climate change in NEPA reviews. The comment period now ends on...

  17. Paducah Gaseous Diffusion Plant Draft Paducah Environmental Assessment...

    Energy Savers [EERE]

    the Draft EA. Written comments may submitted by the following methods: By Mail: Robert Smith, Paducah Strategic Planner Department of Energy-Paducah 5501 Hobbs Road C103 Kevil,...

  18. EIS-0391: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    WA EIS-0391-DEA-NOA-2009.pdf More Documents & Publications EIS-0387: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0183: EPA Notice of Availability of...

  19. EIS-0387: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0387-DEIS-EPANOA-2009.pdf More Documents & Publications EIS-0391: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0183: EPA Notice of Availability of...

  20. Blackout 2003: Conference for public review draft report on implementa...

    Broader source: Energy.gov (indexed) [DOE]

    On Thursday, June 22, in Washington, D.C., the U.S.-Canada Power System Outage Task Force will hold a conference for stakeholders and the public to comment on the draft of the...

  1. Building an electronic drafting table for sketch recognition

    E-Print Network [OSTI]

    Bruening, Oskar Ernst, 1979-

    2004-01-01T23:59:59.000Z

    Sketch recognition as developed by the CSAIL Design Rationale Group allows a designer to sketch out and test design ideas without the need for complicated CAD programs. An electronic drafting table is required to capture ...

  2. annex iii draft: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    contents of the Draft SEIS. Homestead Air; Force Base 2000-01-01 5 IEA HPP Annex 41 Cold Climate Heat Energy Storage, Conversion and Utilization Websites Summary: .) - Task...

  3. Microsoft Word - letter announcing draft contract_attachment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19 th Letter to the Region Summary of Changes BPA has Made in the Draft Contract in Response to the Public Comment Process on the Alcoa Term Sheet BPA published a term sheet...

  4. Special Publication 800-28 Version 2 (Draft)

    E-Print Network [OSTI]

    ) and Theodore Winograd of Booz Allen Hamilton, wish to thank their colleagues who reviewed drafts, Edward Tracy of Booz Allen Hamilton, and Kurt Dillard. iii #12;GUIDELINES ON ACTIVE CONTENT AND MOBILE

  5. Traffic Impact Study for UMore Park Sand and Gravel Resources Project

    E-Print Network [OSTI]

    Netoff, Theoden

    Traffic Impact Study for UMore Park Sand and Gravel Resources Project DRAFT City of Rosemount Impact Study for UMore Park Sand and Gravel Resources Project City of Rosemount and Empire Township Figure 13 Existing Lane Geometry and Intersection Control Figure 14 Mitigation Measures for 2011 and 2030

  6. EIS-0436: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington

  7. Proposed Project: Plains & Eastern Clean Line Transmission Line...

    Broader source: Energy.gov (indexed) [DOE]

    approximately 3,500 MW primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-service entities in the Mid-South and Southeast via an...

  8. Proposed Project: Plains & Eastern Clean Line Transmission Line |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuring SolarNo. 195 - Oct. 7, 2011 |

  9. Proposed Project: Plains & Eastern Clean Line Transmission Line |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of ContaminationHubs+ ReportEnergy NationalDepartment of EnergyNo.

  10. Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: Validating VENT-II

    E-Print Network [OSTI]

    1 Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: Validating VENT. "Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: A Validation of VENT

  11. Draft Guidance for Section 242 of the Energy Policy Act of 2005...

    Office of Environmental Management (EM)

    Draft Guidance for Section 242 of the Energy Policy Act of 2005 - Hydroelectric Production Incentive Program - July 2014 Draft Guidance for Section 242 of the Energy Policy Act of...

  12. EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmen...

    Energy Savers [EERE]

    DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement EIS-0387: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement Y-12...

  13. EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings EIS-0426: DOE Notice of Availability of the Draft Site-Wide...

  14. *** Draft: do not cite or distribute -COP7 Bioenergy Document: October 18, 2001 *** Address Correspondence to

    E-Print Network [OSTI]

    Kammen, Daniel M.

    *** Draft: do not cite or distribute - COP7 Bioenergy Document: October 18, 2001 *** Address;*** Draft: do not cite or distribute - COP7 Bioenergy Document: October 18, 2001 *** 10/23/01 Page 2 of 111 omasera@ate.oikos.unam.mx #12;*** Draft: do not cite or distribute - COP7 Bioenergy Document: October 18

  15. Radiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature

    E-Print Network [OSTI]

    Salvaggio, Carl

    of Mechanical Draft Cooling Towers to Assist in the Extraction of their Absolute Temperature from Remote Thermal Abstract Determination of the internal temperature of a mechanical draft cooling tower (MDCT) from remotelyRadiometric Modeling of Mechanical Draft Cooling Towers to Assist in the Extraction

  16. Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Klickitat County (Wash.)

    1995-03-01T23:59:59.000Z

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.

  17. Williston to Stateline Transmission Line Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental assessment (EA) on the proposed Williston to...

  18. Line Rebuild, Relocation and Substation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |Is Your HomeLatestCenter (LMI-EFRC) -Choices toLee

  19. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.NewofGeothermal Heat PumpJorgeAtlGrad.Employee,

  20. TIES Project is co-financed by the European Commission on the framework of the TEMPUS Programme. Contract: 159218-TEMPUS-1-2009-1-ES-TEMPUS-JPGR

    E-Print Network [OSTI]

    TIES Project is co-financed by the European Commission on the framework of the TEMPUS Programme Escarré Virjinia Ferrer University of Alicante #12;TIES Project is co-financed by the European Commission PARTICIPATION ­ APPLICATION PROCESS & DRAFTING #12;TIES Project is co-financed by the European Commission

  1. EIS-0442: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and

  2. DRAFT DRAFT DRAFT

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisitingContract Management Fermi SitePARTOffice ofHaleREPORT NUCLEAR

  3. Completed Projects Table 2015-02-09.xlsx

    Office of Environmental Management (EM)

    Yes Construction Line Item Project Depleted Uranium Hexafluoride Conversion Project (DUF6) Portsmouth & Paducah 02-U-101 346 580 2008 2010 No No Yes Nuclear Facility...

  4. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    SciTech Connect (OSTI)

    NONE

    1988-01-01T23:59:59.000Z

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs.

  5. FINAL REPORT –INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR THE ARGONNE NATIONAL LABORATORY BUILDING 330 PROJECT FOOTPRINT, ARGONNE, ILLINOIS

    SciTech Connect (OSTI)

    ERIKA N. BAILEY

    2012-02-29T23:59:59.000Z

    ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

  6. Permanent draft genome sequence of the gliding predator Saprospira grandis strain Sa g1 (= HR1)

    SciTech Connect (OSTI)

    Mavromatis, K [U.S. Department of Energy, Joint Genome Institute; Chertkov, Olga [Los Alamos National Laboratory (LANL); Lapidus, Alla L. [U.S. Department of Energy, Joint Genome Institute; Nolan, Matt [U.S. Department of Energy, Joint Genome Institute; Lucas, Susan [U.S. Department of Energy, Joint Genome Institute; Tice, Hope [U.S. Department of Energy, Joint Genome Institute; Glavina Del Rio, Tijana [U.S. Department of Energy, Joint Genome Institute; Cheng, Jan-Fang [U.S. Department of Energy, Joint Genome Institute; Han, Cliff [Los Alamos National Laboratory (LANL); Tapia, Roxanne [Los Alamos National Laboratory (LANL); Bruce, David [Los Alamos National Laboratory (LANL); Goodwin, Lynne A. [Los Alamos National Laboratory (LANL); Pitluck, Sam [U.S. Department of Energy, Joint Genome Institute; Huntemann, Marcel [U.S. Department of Energy, Joint Genome Institute; Liolios, Konstantinos [U.S. Department of Energy, Joint Genome Institute; Pagani, Ioanna [U.S. Department of Energy, Joint Genome Institute; Ivanova, N [U.S. Department of Energy, Joint Genome Institute; Mikhailova, Natalia [U.S. Department of Energy, Joint Genome Institute; Pati, Amrita [U.S. Department of Energy, Joint Genome Institute; Chen, Amy [U.S. Department of Energy, Joint Genome Institute; Palaniappan, Krishna [U.S. Department of Energy, Joint Genome Institute; Land, Miriam L [ORNL; Brambilla, Evelyne-Marie [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Rohde, Manfred [HZI - Helmholtz Centre for Infection Research, Braunschweig, Germany; Spring, Stefan [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Goker, Markus [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Detter, J. Chris [U.S. Department of Energy, Joint Genome Institute; Bristow, James [U.S. Department of Energy, Joint Genome Institute; Eisen, Jonathan [U.S. Department of Energy, Joint Genome Institute; Markowitz, Victor [U.S. Department of Energy, Joint Genome Institute; Hugenholtz, Philip [U.S. Department of Energy, Joint Genome Institute; Kyrpides, Nikos C [U.S. Department of Energy, Joint Genome Institute; Klenk, Hans-Peter [DSMZ - German Collection of Microorganisms and Cell Cultures GmbH, Braunschweig, Germany; Woyke, Tanja [U.S. Department of Energy, Joint Genome Institute

    2012-01-01T23:59:59.000Z

    Saprospira grandis Gross et al. 1911 is a member of the Saprospiraceae, a family in the class 'Sphingobacteria' that remains poorly characterized at the genomic level. The species is known for preying on other marine bacteria via 'ixotrophy'. S. grandis strain Sa g1 was isolated from decaying crab carapace in France and was selected for genome sequencing because of its isolated location in the tree of life. Only one type strain genome has been published so far from the Saprospiraceae, while the sequence of strain Sa g1 represents the second genome to be published from a non-type strain of S. grandis. Here we describe the features of this organism, together with the complete genome sequence and annotation. The 4,495,250 bp long Improved-High-Quality draft of the genome with its 3,536 protein-coding and 62 RNA genes is a part of the Genomic Encyclopedia of Bacteria and Archaea project.

  7. Draft Work Plan Environmental Assessment and Characterization

    E-Print Network [OSTI]

    Institute Site Flood Plain Area Golden, Colorado Prepared by S.M. Stoller Corporation, 2010 WORK PLAN APPROVALS Date: January 8, 2010 Radiation Safety Officer (RSO) Project

  8. Technical background document for draft soil screening level guidance

    SciTech Connect (OSTI)

    Not Available

    1994-03-01T23:59:59.000Z

    The document provides technical details of the derivation of the September 30, 1993, draft Soil Screening Levels (SSLs) Guidance for Superfund (PB93-963508). The document is presented in two sections. Section I defines SSL and provides background information on the development of SSLs and their application and implementation at Superfund sites, including sampling schemes for measuring SSL attainment. It also provides draft SSLs developed for 30 chemicals. Section II provides the technical basis for the development of SSLs addressing direct ingestion of soil, inhalation of volatiles and fugitive dust, and the soil-to-ground-water exposure pathway, including the assumptions and theories used the their development.

  9. EIS-0346: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of98-F,-SA-01:5-SA-01:Draft Envrionmental Impact6: Draft

  10. EIS-0349: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of98-F,-SA-01:5-SA-01:Draft EnvrionmentalLaboratory ThisDraft

  11. EIS-0355: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of98-F,-SA-01:5-SA-01:Draftof EnergyImpact1:DraftRecordDraft

  12. EIS-0377: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised Finding of98-F,-SA-01:5-SA-01:DraftoftotoRecord ofDraftDepartmentDraft

  13. Draft of September 27, 2006 | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed off Energy.gov. Are you0andEnergyGlobal NuclearofCommunication |Does YourDr. Monica C.DraftDraft

  14. Draft Public Involvement Advice for Central Plateau Cleanup

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraftDraft- RAP/PICV0, 12/9/14

  15. Draft RCRA Permit Workshop Info for HAB Presenters

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA : Papers69Christopher FeckoDraftDraft- RAP/PICV0,

  16. Productivity Improvement of a Manual Assembly Line

    E-Print Network [OSTI]

    Yerasi, Pranavi

    2012-10-19T23:59:59.000Z

    The current project addresses the productivity improvement of a manual assembly line by making use of operations analysis in the framework of Lean production. A methodology is proposed that helps to improve the productivity of any production process...

  17. Kamal Kapadia DRAFT Productive Uses of Renewables

    E-Print Network [OSTI]

    Kammen, Daniel M.

    ) ................................................. 13 China: Passive Solar Heating for Rural Health Clinics (China PSHRHC)......................... 13?............................................................................... 4 DESIGNING AND IMPLEMENTING RENEWABLE ENERGY PROJECTS WITH PRODUCTIVE USE COMPONENTS: ANALYSIS the productive uses of energy is an important aspect in the design and implementation of rural energy projects

  18. NAESB BPS ATC Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in the interest of "equity" between BA's Draft language proposed by Southern: XXX-2.3.7.1 Each Transmission Service Provider that selects the Flowgate Methodology shall...

  19. PERFORMANCE ANALYSIS OF MECHANICAL DRAFT COOLING TOWER

    SciTech Connect (OSTI)

    Lee, S; Alfred Garrett, A; James02 Bollinger, J; Larry Koffman, L

    2009-02-10T23:59:59.000Z

    Industrial processes use mechanical draft cooling towers (MDCT's) to dissipate waste heat by transferring heat from water to air via evaporative cooling, which causes air humidification. The Savannah River Site (SRS) has cross-flow and counter-current MDCT's consisting of four independent compartments called cells. Each cell has its own fan to help maximize heat transfer between ambient air and circulated water. The primary objective of the work is to simulate the cooling tower performance for the counter-current cooling tower and to conduct a parametric study under different fan speeds and ambient air conditions. The Savannah River National Laboratory (SRNL) developed a computational fluid dynamics (CFD) model and performed the benchmarking analysis against the integral measurement results to accomplish the objective. The model uses three-dimensional steady-state momentum, continuity equations, air-vapor species balance equation, and two-equation turbulence as the basic governing equations. It was assumed that vapor phase is always transported by the continuous air phase with no slip velocity. In this case, water droplet component was considered as discrete phase for the interfacial heat and mass transfer via Lagrangian approach. Thus, the air-vapor mixture model with discrete water droplet phase is used for the analysis. A series of parametric calculations was performed to investigate the impact of wind speeds and ambient conditions on the thermal performance of the cooling tower when fans were operating and when they were turned off. The model was also benchmarked against the literature data and the SRS integral test results for key parameters such as air temperature and humidity at the tower exit and water temperature for given ambient conditions. Detailed results will be published here.

  20. Dampers for Natural Draft Heaters: Technical Report

    SciTech Connect (OSTI)

    Lutz, James D.; Biermayer, Peter; King, Derek

    2008-10-27T23:59:59.000Z

    Energy required for water heating accounts for approximately 40percent of national residential natural gas consumption in California. With water heating contributing such a substantial portion of natural gas consumption, it is important to pay attention to water heater efficiencies. This paper reports on an investigation of a patented, buoyancy-operated flue damper. It is an add-on design to a standard atmospherically vented natural-draft gas-fired storage water heater. The flue damper was expected to reduce off-cycle standby losses, which would lead to improvements in the efficiency of the water heater. The test results showed that the Energy Factor of the baseline water heater was 0.576. The recovery efficiency was 0.768. The standby heat loss coefficient was 10.619 (BTU/hr-oF). After the damper was installed, the test results show an Energy Factor for the baseline water heater of 0.605. The recovery efficiency was 0.786. The standby heat loss coefficient was 9.135 (BTU/hr-oF). The recovery efficiency increased 2.3percent and the standby heat loss coefficient decreased 14percent. When the burner was on, the baseline water heater caused 28.0 CFM of air to flow from the room. During standby, the flow was 12.4 CFM. The addition of the damper reduced the flow when the burner was on to 23.5 CFM. During standby, flow with the damper was reduced to 11.1 CFM. The flue damper reduced off-cycle standby losses, and improved the efficiency of the water heater. The flue damper also improved the recovery efficiency of the water heater by restricting on-cycle air flows through the flue.With or without the flue damper, off-cycle air flow upthe stack is nearly half the air flow rate as when the burner is firing.

  1. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01T23:59:59.000Z

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  2. Draft 2-5-06 appendix B: Land Leases

    E-Print Network [OSTI]

    Lee, Jason R.

    background Draft 2-5-06 appendix B: Land Leases appendices tract / Parcel / Buildings acres Wilson (Grizzly Peak Substation) 0.50 The Berkeley Lab main site is a 202 acre parcel of land owned and managed Figure F.1 3 Photo the new Molecular Foundry building earned the u.s. green building council's "silver

  3. CALIFORNIA ENERGY DEMAND 2008-2018 STAFF DRAFT FORECAST

    E-Print Network [OSTI]

    procurement process at the California Public Utilities Commission. This forecast was produced with the Energy Commission demand forecast models. Both the staff draft energy consumption and peak forecasts are slightly and commercial sectors. Keywords Electricity demand, electricity consumption, demand forecast, weather

  4. Draft NIST Framework and Roadmap4 Smart Grid Interoperability6

    E-Print Network [OSTI]

    Magee, Joseph W.

    1 2 3 Draft NIST Framework and Roadmap4 for5 Smart Grid Interoperability6 Standards,7 Release 2 and Roadmap28 for29 Smart Grid Interoperability30 Standards,31 Release 2.032 33 October 17, 2011 REVISION34 35....................................................................................... 2446 2. Smart Grid Visions

  5. SECRETARIAL REVIEW DRAFT ENVIRONMENTAL ASSESSMENT/REGULATORY IMPACT REVIEW/

    E-Print Network [OSTI]

    SECRETARIAL REVIEW DRAFT ENVIRONMENTAL ASSESSMENT/REGULATORY IMPACT REVIEW/ INITIAL REGULATORY The purpose of the non-AFA crab sideboard limits was to prevent vessels with crab QS from disadvantaging non for non-American Fisheries Act (AFA) crab vessels. In April 2007, the Council began developing options

  6. DRAFT LEAD COMMISSIONER REPORT 2012 INTEGRATED ENERGY POLICY

    E-Print Network [OSTI]

    in the natural gas market; (3) the potential for increased development of combined heat and power facilities; (4 DRAFT LEAD COMMISSIONER REPORT 2012 INTEGRATED ENERGY POLICY REPORT UPDATE CALIFORNIA ENERGY COMMISSION Carla J. Peterman Lead Commissioner, Integrated Energy Policy Report Robert P. Oglesby

  7. WARNER COLLEGE OF NATURAL RESOURCES Based on Jan. 1998 Draft

    E-Print Network [OSTI]

    the responsible use and protection of renewable and non-renewable resources. Administrative Officers1 WARNER COLLEGE OF NATURAL RESOURCES CODE Based on Jan. 1998 Draft UPDATED Jan. 2006 Organization The Warner College of Natural Resources (WCNR) is administratively organized into four academic departments

  8. HMSC Sustainability Committee 9/7/06 Meeting Minutes (Draft)

    E-Print Network [OSTI]

    HMSC Sustainability Committee 9/7/06 Meeting Minutes (Draft) In attendance: Todd Bridgeman, Jim in sustainability in the local community -- several grass-roots initiatives have been launched to get local businesses and municipalities to learn about sustainability and incorporate it into planning and operations

  9. Stewart and Khosla: The Chimera Methodology 1 FINAL DRAFT

    E-Print Network [OSTI]

    Stewart and Khosla: The Chimera Methodology 1 FINAL DRAFT THE CHIMERA METHODOLOGY: DESIGNING 15213 pkk@ri.cmu.edu Abstract: The Chimera Methodology is a software engineering paradigm that enables the objects have been developed and in­ corporated into the Chimera Real­Time Operating System. Techniques

  10. DRAFT ENVIRONMENTAL ASSESSMENT1 PINE CREEK DAM, OKLAHOMA2

    E-Print Network [OSTI]

    US Army Corps of Engineers

    #12;#12;DRAFT ENVIRONMENTAL ASSESSMENT1 PINE CREEK DAM, OKLAHOMA2 DAM SAFETY MODIFICATION3 &4 Environmental Assessment Pine Creek Dam, Oklahoma Dam Safety Modification & Interim Risk Reduction Measure of Federal Regulations, Part 230, the Tulsa District has assessed the environmental impacts of modifications

  11. Results of IEC 62804 Draft Round Robin Testing (Presentation)

    SciTech Connect (OSTI)

    Hacke, P.; Terwilliger, K.; Koch, S.; Weber, T.; Berghold, J.; Hoffmann, S.; Koehl, M.; Dietrich, S.; Mathiak, G.; Ebert, M.

    2013-09-01T23:59:59.000Z

    Three crystalline silicon module designs were distributed in five replicas each to five laboratories for testing according to the IEC 62804 (Committee Draft) system voltage durability qualification test for crystalline silicon photovoltaic (PV) modules. The stress tests were performed in environmental chambers at 60 degrees C, 85% relative humidity, 96 h, and with module nameplate system voltage applied.

  12. NIST Special Publication 800-160 Initial Public Draft

    E-Print Network [OSTI]

    the Federal Information Security Management Act (FISMA), Public Law (P.L.) 107-347. NIST is responsible agencies may wish to closely follow the development of these new publications by NIST. OrganizationsNIST Special Publication 800-160 Initial Public Draft Systems Security Engineering An Integrated

  13. DRAFT: November 1, 2007 DETECTION OF THE TRANSVERSE PROXIMITY EFFECT

    E-Print Network [OSTI]

    Steidel, Chuck

    DRAFT: November 1, 2007 DETECTION OF THE TRANSVERSE PROXIMITY EFFECT: RADIATIVE FEEDBACK FROM medium to a blast of ionizing radiation allows one to infer the physical properties of the medium and discuss several effects that may explain why the transverse proximity effect has eluded most previous

  14. DRAFT FOR PUBLIC COMMENT April 8, 2004 1

    E-Print Network [OSTI]

    of the Bonneville Power Administration in Power Supply Document 2004-02 April 9, 2004 Executive summary Over the past several years the Bonneville Power Administration has faced periods of instability that have Of The Bonneville Power Administration, October 29, 2002 Draft,; What Led to the Current BPA Financial Crisis? A BPA

  15. Communicating Dangers and Opportunities in Global Warming 13 December Draft

    E-Print Network [OSTI]

    Hansen, James E.

    Communicating Dangers and Opportunities in Global Warming 13 December Draft James Hansen American: "Subversion of Public Affairs Chart 7: The Global Warming Story C. Tenets of a Democracy: "An Informed Public, not as a spokesman for NASA There is a huge gap between what is understood about global warming and what is known

  16. Typing Illegal Information Flows as Program Effects Draft

    E-Print Network [OSTI]

    Typing Illegal Information Flows as Program Effects ­ Draft Ana Almeida Matos Instituto de. To this end, sets of illegal information flows are represented as downward closure operators (here referred representations of flexible information flow policies. Illegal information flows can then be seen as program

  17. results and benefits... The Bittern Line Carbon

    E-Print Network [OSTI]

    Everest, Graham R

    results and benefits... The Bittern Line Carbon Neutral Stations Transport Regeneration Ltd. June 2008 c a s e s t u d yCRed carbon reduction Project Summary Our client, Transport Regeneration Ltd., aims to make nine stations on the Bittern Line between Norwich and Sheringham carbon neutral

  18. The Linux Command Line Second Internet Edition

    E-Print Network [OSTI]

    Dahl, David B.

    The Linux Command Line Second Internet Edition William E. Shotts, Jr. A LinuxCommand.org Book #12....................................................................................................xvi Why Use The Command Line to their respective owners. This book is part of the LinuxCommand.org project, a site for Linux education and advo

  19. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  20. DRAFT --DRAFT --DRAFT --DRAFT --DRAFT --Bibliography

    E-Print Network [OSTI]

    Liverani, Carlangelo

    -dispersing billiards Annals of Mathemathics (2) 147, no. 3, 695­708, (1998). [26] D.Burago, S. Ferleger, A

  1. DRAFT DRAFT DRAFT DRAFT DRAFT 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration wouldDECOMPOSITION OF CALCIUMCOSTDOENuclear1382DOINGTuning for IntelInput

  2. DRAFT DRAFT DRAFT DRAFT DRAFT 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration wouldDECOMPOSITION OF CALCIUMCOSTDOENuclear1382DOINGTuning for IntelInput*

  3. DRAFT DRAFT DRAFT DRAFT DRAFT 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration wouldDECOMPOSITION OF CALCIUMCOSTDOENuclear1382DOINGTuning for IntelInput*

  4. DRAFT COMMITTEE REPORT RENEWABLE ENERGY PROGRAM

    E-Print Network [OSTI]

    of Renewable Resource Trust Fund dollars, information on cash flow, program activities and results, and projects and funding awards. Keywords: Renewable Energy Program, Renewable Resource Trust Fund Facilities Program, New Renewable Resources Account, Existing Renewable Facilities Program, Emerging

  5. EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment DOE will prepare an EA to evaluate the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington.

  6. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: Ł51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  7. Exploration and project management Sylvain Lenfle

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    to manage innovation. We argue that, in line with the work on project classification, a distinction should1 Exploration and project management Sylvain Lenfle University of Cergy-Pontoise Management of Project Management, Vol. 6, n°5, p. 469-478, July. Abstract Project management in academic studies tends

  8. Draft 99.6.17 Market Architecture

    E-Print Network [OSTI]

    Tesfatsion, Leigh

    in the infrastructure network, such as electricity or gas transmission and rail lines, from the associated commodity and the Electric Power Research Institute. I am grateful for joint work on these topics with my co-author, Hung electricity as the example. The perspective of game theory complements standard economic theory to predict

  9. DRAFT PROPOSED AMENDMENTS TO APPLIANCE EFFICIENCY REGULATIONS

    E-Print Network [OSTI]

    in Section 1602(l). (4) designed exclusively to be connected to distribution and transmission lines of peak, contractors and subcontractors make no warrant, express or implied, and assume no legal liability and then changes the electric lighting level in response to the daylight changes. "Automatic time switch control

  10. Project Funding

    Broader source: Energy.gov [DOE]

    Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings.

  11. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11T23:59:59.000Z

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  12. Geothermal Energy R&D Program Annual Progress Report for Fiscal Year 1989 Draft

    SciTech Connect (OSTI)

    None

    1990-04-01T23:59:59.000Z

    This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE -2005)

  13. EIS-0380: DOE Notice of Availability of the Draft Site-Wide Environmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement Continued Operation of Los Alamos National Laboratory, Los Alamos, New Mexico NNSA announces the availability of the Draft Site-wide Environmental Impact...

  14. EIS-0403: EPA Amended Notice of Availability of the Draft Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comment Period) EIS-0403: EPA Amended Notice of Availability of the Draft Programmatic Environmental Impact Statement (Extension of Public Comment Period) Solar Energy...

  15. EIS-0403: DOE and BLM Notice of Availability of the Draft Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0403: DOE and BLM Notice of Availability of the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The...

  16. EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...

    Broader source: Energy.gov (indexed) [DOE]

    for the Long-Term Management and Storage of Elemental Mercury EPA announces the availability of the Draft Supplemental Environmental Impact Statement for the Long-Term...

  17. Draft Genome Sequences of Eight Enterohepatic Helicobacter Species Isolated from Both Laboratory and Wild Rodents

    E-Print Network [OSTI]

    Sheh, Alexander

    The draft genome sequences of eight enterohepatic Helicobacter species, H. muridarum, H. trogontum, H. typhlonius, and five unnamed helicobacters, are presented here. Using laboratory mice pervasively infected with ...

  18. Draft Genome Sequence of Rhizobium sp. PDO1-076, a bacterium isolated from Populus deltoides.

    SciTech Connect (OSTI)

    Brown, Steven D [ORNL; Klingeman, Dawn Marie [ORNL; Lu, Tse-Yuan [ORNL; Johnson, Courtney M [ORNL; Utturkar, Sagar M [ORNL; Land, Miriam L [ORNL; Schadt, Christopher Warren [ORNL; Doktycz, Mitchel John [ORNL; Pelletier, Dale A [ORNL

    2012-01-01T23:59:59.000Z

    Rhizobium sp. strain PDO1-076 is a plant-associated bacterium isolated from Populus deltoides, and its draft genome sequence is reported.

  19. Microsoft Word - 2012.01.24_RFHP_DRAFT_SEA.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT RENEWABLE FUEL HEAT PLANT IMPROVEMENTS SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT NATIONAL RENEWABLE ENERGY LABORATORY SOUTH TABLE MOUNTAIN SITE GOLDEN, COLORADO February 3, 2012...

  20. EA-1573-S1: Notice of Availability of a Draft Supplemental Environment...

    Broader source: Energy.gov (indexed) [DOE]

    Proposed Renewable Fule Heat Plant Improvements at the National Renewable Energy Laboratory South Table Mountain Site, Golden, CO DOE's Golden Field Office has prepared a draft...