National Library of Energy BETA

Sample records for line project draft

  1. Draft Northern Pass Transmission Line Project Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Emissions and Loss of CO2 Uptake from Vegetation ... In 2013 natural gas plants provided approximately 45 percent ... draft EIS through several methods, including distribution of ...

  2. Draft Northern Pass Transmission Line Project Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    ... S-28 Table S-14. Construction Emissions and Loss of CO2 ... capacity (primarily coal and oil units) are ... draft EIS through several methods, including distribution of ...

  3. Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-02-08

    This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

  4. Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242- Dec. 17, 2014

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS–0486; Draft EIS) for a 90-day public comment period. DOE also announces 15 public hearings to receive comments on the Draft EIS. In addition, DOE invites comments on the National Historic Preservation Act Section 106 process and any potential adverse impacts to historic properties from the proposed Project.

  5. McNary-John Day Transmission Line Project Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-03-08

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

  6. Great Northern Transmission Line Project Draft Environmental Impact Statement_Volume II

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O Agricultural Impact Mitigation Plan (AIMP) Example ITCM Minnesota - Iowa 345 kV Transmission Line Project: Final Environmental Impact Statement Appendix O Agricultural Impact Mitigation Plan O-1 ITC Midwest LLC Agricultural Impact Mitigation Plan Minnesota - Iowa 345 kV Transmission Project and Associated Facilities in Jackson, Martin, and Faribault Counties Docket Nos. ET6675/CN-12-1053 & ET6675/TL-12-1337 April 29, 2014 ITC Midwest's DEIS Comment Letter E X A M P L E ITCM Minnesota -

  7. Proposed Southline Transmission Line Project - Volume 4 of 4...

    Office of Environmental Management (EM)

    2 Appendix J J-1 Southline Transmission Line Project Draft Environmental Impact Statement and Draft Resource Management Plan Amendment BLM LAND USE AUTHORIZATIONS 1...

  8. Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-09

    BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability

  9. Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed Great Northern Transmission Line (GNTL) Project: Federal Register Notice, Volume 80, No. 123- Jun. 26, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE) announces the availability of the “Great Northern Transmission Line Project Draft Environmental Impact Statement” (DOE/EIS-0499) for public review and comment. DOE is also announcing eight public hearings to receive comments on the Draft EIS.

  10. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  11. Lake Erie Connector Project Environmental Assessment Draft

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Volume 1 - Main Document U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington DC June 2016 Cover Photo Credits http://www.itclakeerieconnector.com/ DRAFT LAKE ERIE CONNECTOR PROJECT ENVIRONMENTAL ASSESSMENT Volume 1-Main Document DOE/EA-2019 U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY COOPERATING AGENCY U.S. ARMY CORPS OF ENGINEERS This Page Intentionally Left Blank Lake Erie Connector Project Draft Environmental

  12. EIS-0486: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0486: Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Draft EIS to evaluate the ...

  13. EIS-0325: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project This summary covers the major points of the Draft...

  14. EA-1891: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1891: Draft Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration issued a draft EA to ...

  15. Draft Advanced Fossil Energy Projects Solicitation Public Comments

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Loan Programs Office: Draft Advanced Fossil Energy Projects Solicitation Public Comments

  16. Draft Renewable Energy and Efficient Energy Projects Solicitation...

    Broader source: Energy.gov (indexed) [DOE]

    Draft: Renewable Energy and Efficient Energy Projects Solicitation Fact Sheet More Documents & Publications REEE Solicitation Fact Sheet FINAL U.S. Energy Association Presentation...

  17. New Draft Page Change - Program and Project Management for the...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft Page Change - Program and Project Management for the Acquisition of Capital Assets by Patricia Greeson The Page Change is a limited update to incorporate recent Secretarial...

  18. Draft Project Execution Plan for the Ion Beam Laboratory at Sandia...

    Office of Environmental Management (EM)

    Draft Project Execution Plan for the Ion Beam Laboratory at Sandia National Laboratories Draft Project Execution Plan for the Ion Beam Laboratory at Sandia National Laboratories ...

  19. Draft

    Energy Savers [EERE]

    Draft Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994

  20. DRAFT 2012 DOE Project Management Workshop Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT 2012 DOE Project Management Workshop Agenda DRAFT 2012 DOE Project Management Workshop Agenda 2012 Workshop Agenda_Ver_25 (For Distribution).pdf (38.46 KB) More Documents & Publications 2011 Workshop Agenda_Ver_19.xlsx 2011_Workshop_Agenda_Ver_16(1).pdf 2011 Workshop Agenda_Ver_21.xlsx

  1. EIS-0317-S1: Draft Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Supplemental Environmental Impact Statement EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  2. EIS-0499: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0499: EPA Notice of Availability of Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota EPA announced the availability of the Draft ...

  3. EIS-0483: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0483: Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado...

  4. EA-1960: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1960: Draft Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western...

  5. EIS-0463: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0463: EPA Notice of Availability of Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire EPA announced the availability of the Draft ...

  6. EIS-0395: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio...

  7. Lake Erie Connector Project Envrionmental Assessment Appendix Draft

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Volume II-Appendices U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington DC June 2016 Cover Photo Credits http://www.itclakeerieconnector.com/ DRAFT LAKE ERIE CONNECTOR PROJECT ENVIRONMENTAL ASSESSMENT Volume II Appendices DOE/EA-2019 U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY COOPERATING AGENCY U.S. ARMY CORPS OF ENGINEERS This Page Intentionally Left Blank Lake Erie Connector Project Draft Environmental Assessment

  8. Great Northern Transmission Line Project Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... by reducing intact blocks of forest vegetation. ... Methods for Calculating Forest Ecosystem and Harvested ... State Implementation Plan SO2 Sulfur dioxide SNA ...

  9. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  10. EIS-0463: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0463: EPA Notice of Availability of Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire EPA announced the availability of the Draft Environmental Impact Statement (Draft EIS) for the Northern Pass Transmission Line Project. The Draft EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Northern Pass

  11. From: Diana Rivera To: Congestion Study Comments Subject: Comments of Clean Line Energy on Draft Congestion Study

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Diana Rivera To: Congestion Study Comments Subject: Comments of Clean Line Energy on Draft Congestion Study Date: Monday, October 20, 2014 3:54:46 PM Attachments: image002.png Clean Line Comments to DOE 2014 Draft Congestion Study.pdf Hello, Thank you for the opportunity to comment on the draft congestion study. Please see the attached comments from Clean Line Energy Partners. We would be happy to answer any questions or provide additional information. Best regards, Diana Diana Rivera CLEAN LINE

  12. Addendum: Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana - Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Yellowstone Intake Diversion Dam Fish Passage Project, Montana Draft Environmental Impact Statement- Addendum June 2016 1 Addendum: Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana Draft Environmental Impact Statement Introduction The Corps of Engineers (Corps) and the Bureau of Reclamation (Reclamation) have prepared this addendum to the Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft Environmental Impact Statement (EIS) to provide the public with the

  13. EIS-0474: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southline Transmission Line Project; Arizona and New Mexico EPA announces the availability of the Southline Transmission Project, (Arizona and New Mexico), draft EIS that was issued by ...

  14. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix E Monitoring and Adaptive Management i Contents 1.0 Introduction ............................................................................................................................. 1 Project Goal and Objectives ................................................................................................... 1 2.0 Rock

  15. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  16. EIS-0499: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 9: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0499: DOE Notice of Availability of Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota The U.S. Department of Energy (DOE) announced the availability of the Draft Environmental Impact Statement for the Great Northern Transmission Line Project. DOE also is announcing the dates, times, and locations for public hearings to receive comments on the Draft

  17. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    C - SECTION 404(b)(1) Lower Yellowstone Intake Fish Passage EIS Draft Section 404(b)(1) Analysis Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft Appendix C Section 404(b)(1) Analysis May 2016 i Contents 1 Introduction ..............................................................................................................................1 1.1 Background .......................................................................................................................1

  18. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Modification Project, Montana DRAFT APPENDIX D Lower Yellowstone Intake Fish Passage EIS Fish Passage Connectivity Index and Cost Effectiveness and Incremental Cost Analysis MAY 2016 Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana APPENDIX D Lower Yellowstone Intake Fish Passage EIS Fish Passage Connectivity Index and Cost Effectiveness and Incremental Cost Analysis Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft

  19. BP Cherry Point Cogeneration Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-09-19

    respective decision-making processes associated with the Applicant's request to interconnect to Bonneville's transmission system and proposed location of the project within wetland areas. Therefore, this Draft EIS serves as the environmental review document for SEPA and for NEPA as required by Bonneville for the interconnection and the Corps for its 404 individual permit. The EIS addresses direct, indirect, and cumulative impacts of the proposed project, and potential mitigation measures proposed by the Applicant, as well as measures recommended by EFSEC. The information and resulting analysis presented in this Draft EIS are based primarily on information provided by the Applicant in the ASC No. 2002-01 (BP 2002). Where additional information was used to evaluate the potential impacts associated with the proposed action, that information has been referenced. EFSEC's environmental consultant, Shapiro and Associates, Inc., did not perform additional studies during the preparation of this Draft EIS.

  20. DRAFT

    National Nuclear Security Administration (NNSA)

    Environmental Assessment for NorthStar Medical Technologies LLC Commercial Domestic Production of the Medical Isotope Molybdenum-99 (DOE/EA-1929) Prepared for U.S. Department of Energy National Nuclear Security Administration Defense Nuclear Nonproliferation/ Global Threat Reduction Initiative July 2012 EA for NorthStar Medical Technologies LLC Commercial Domestic Production of the Medical Isotope Mo-99 DRAFT ii This Page Intentionally Left Blank EA for NorthStar Medical Technologies LLC

  1. EIS-0486: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of Draft Environmental Impact Statement EIS-0486: DOE Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a draft EIS that evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600

  2. EIS-0414: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0414: EPA Notice of Availability of the Draft Environmental Impact Statement Energia Sierra Juarez U.S. Transmission Line Project, Construction, Operation, Maintenance,...

  3. EIS-0505: EPA Notice of Availability of Supplemental Draft Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, ...

  4. EIS-0379: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt...

  5. EIS-0474: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0474: EPA Notice of Availability of Draft Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico EPA announces the availability of the ...

  6. EIS-0483: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement EIS-0483: EPA Notice of Availability of Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado...

  7. EIS-0483: Draft Environmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado Western Area Power Administration prepared a draft EIS that analyzes the potential...

  8. EIS-0463: Revision to EPA Notice Of Availability Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire This Notice of Availability was first published in the Federal Register on...

  9. EIS-0400: Draft Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    EIS-0400: Draft Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO This EIS evaluates the ...

  10. EIS-0332: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0332: Draft Environmental Impact Statement McNary-John Day Transmission Line Project Bonneville is proposing to construct, operate, and...

  11. EIS-0463: Revision to EPA Notice Of Availability Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0463: Revision to EPA Notice Of Availability Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire This Notice of Availability was first ...

  12. Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-08-27

    Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or

  13. CXD 4601, Line Yard Fence Project (4601)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Line Yard Fence Project (4601) Y-12 Site Office Oak Ridge, Anderson County, Tennessee The proposed action is to install fencing around the Old Line Yard to provide protected...

  14. Northern Pass Transmission Line Project Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September ...

  15. EIS-0486: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0486: EPA Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project EPA announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project. The comment period ends on March 19, 2015, as indicated in the EPA correction notice. For more information visit the project

  16. DOE Issues Draft RFP for Idaho Cleanup Project Core | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    RFP for Idaho Cleanup Project Core DOE Issues Draft RFP for Idaho Cleanup Project Core December 22, 2014 - 2:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Idaho Cleanup Project (ICP) Core procurement. The ICP Core procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition

  17. Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

  18. Panel 2, Renewable Energy & Energy Efficiency Projects: Draft Loan Guarantee Solicitation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Loan Guarantee Solicitation May 2014 2 LPO: The Financing Force for a Clean Energy Economy Mission: Accelerate the U.S. commercial deployment of innovative clean energy and advanced vehicle manufacturing. What We Do: Provide project debt for clean energy projects. We also encourage co-lending with commercial lenders. Who We Are: LPO is a world class clean energy financing institution based within DOE - one of the largest project finance and clean energy lenders in the U.S. *The current

  19. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Inpact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B - COST ENGINEERING Lower Yellowstone Intake Fish Passage EIS Lower Yellowstone Intake Diversion Dam Fish Project Draft Cost Engineering Appendix May 2016 ii Contents 1.0 Alternative Construction Cost Estimates ................................................................................ 1 1.1 General ........................................................................................................................ 1 1.2 Purpose

  20. Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects

    Broader source: Energy.gov [DOE]

    The Department of Energy has issued a draft solicitation that would provide up to $12.6 billion in loan guarantees for Advanced Nuclear Energy Projects, supporting the Administration’s all-of-the-above energy strategy and bringing the nation closer to its low-carbon future.

  1. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY ...

  2. EIS-0474: Southline Transmission Line Project; Arizona and New...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Line Project; Arizona and New Mexico EIS-0474: Southline Transmission Line Project; Arizona and New Mexico Summary The Bureau of Land Management and Western ...

  3. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix F Correspondence Lower Yellowstone Intake Diversion Dam Correspondence Fish Passage Project Appendix F Attachment 1 Correspondence Distributed DEPARTM ENT OF THE ARMY CORPS OF ENGINEERS, OMAHA DISTRICT 1616 CAPITOL AVENUE OMAHA NE 68102-4901 April 5, 2016 District Commander Mr. Lester Randall, Chairman Kickapoo Tribe in Kansas PO Box 271 1107 Goldfinch Road Horton, Kansas 66439 Dear Chairman Randall: The U.S.

  4. EA-1880: Notice of Availability of a Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Availability of a Draft Environmental Assessment EA-1880: Notice of Availability of a Draft Environmental Assessment Big Bend to Witten Transmission Line Project, South Dakota The USDA Rural Utilities Service, initially the lead agency, issued a draft EA that assesses the potential environmental impacts of a proposal by Basic Electric Power Cooperative to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line in South Dakota.

  5. EA-1946: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1946: Draft Environmental Assessment Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. EA-1946-DEA-2014.pdf (9.88 MB) More Documents & Publications EA-1946: Final

  6. EIS-0499: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0499: Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 883-megawatt electric transmission system across the U.S.-Canada border. The proposed 220-mile transmission line would cross the border near Roseau, Minnesota, and

  7. Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation

    Broader source: Energy.gov [DOE]

    The Energy Department issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the United States that avoid, reduce, or sequester greenhouse gases.

  8. Salton Sea Scientific Drilling Project Archival Reference, Final Draft

    SciTech Connect (OSTI)

    1991-03-13

    This report provides an archival reference to the scientific information and other pertinent documents and materials associated with the Salton Sea Scientific Drilling Project (SSDP). This archiving process ensures that valuable technical data and information obtained during the life of the project can be retrieved, organized and maintained as a historical record for future reference. This paper describes the background of the project and the process used for archiving the materials. [DJE-2005

  9. Project Schedules and Milestones Draft July 2014 Site Management Plan Page 1

    Office of Legacy Management (LM)

    Draft July 2014 Site Management Plan Page 1 5.0 Project Schedules and Milestones (FY 2015-FY 2017) 5.1 Establishing Project Schedules and Milestones As stated in Section 1.1.2, the Site Management Plan (SMP) establishes the overall plan for remedial actions at the Monticello Mill Tailings Site (MMTS) and milestones against which progress can be measured. The SMP also documents the overall plan for remedial actions at the Monticello Vicinity Properties site (MVP), which was deleted from the

  10. EIS-0463-S1: EPA Notice of Availability of Supplement to the Draft

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement | Department of Energy -S1: EPA Notice of Availability of Supplement to the Draft Environmental Impact Statement EIS-0463-S1: EPA Notice of Availability of Supplement to the Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire EPA announced the availability of the Supplement to the Draft Environmental Impact Statement (Supplement) for the Northern Pass Transmission Line Project. The Supplement analyzes a new alternative

  11. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    SciTech Connect (OSTI)

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  12. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, ...

  13. Plains & Eastern Clean Line Project Proposal for New or Upgraded...

    Broader source: Energy.gov (indexed) [DOE]

    Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) PDF icon Update to Plains & Eastern Clean ...

  14. EIS-0503: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0503: Draft Environmental Impact Statement New England Clean Power Link Project, Vermont DOE prepared this Draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Transmission Developers, Inc.-New England, to construct, operate, maintain, and connect a new 1000-megawatt electric transmission system across the U.S.-Canada border near Alburgh, VT. The transmission line would connect to the Vermont

  15. Draft evaluation of the frequency for gas sampling for the high burnup confirmatory data project

    SciTech Connect (OSTI)

    Stockman, Christine T.; Alsaed, Halim A.; Bryan, Charles R.

    2015-03-26

    This report fulfills the M3 milestone M3FT-15SN0802041, “Draft Evaluation of the Frequency for Gas Sampling for the High Burn-up Storage Demonstration Project” under Work Package FT-15SN080204, “ST Field Demonstration Support – SNL”. This report provides a technically based gas sampling frequency strategy for the High Burnup (HBU) Confirmatory Data Project. The evaluation of: 1) the types and magnitudes of gases that could be present in the project cask and, 2) the degradation mechanisms that could change gas compositions culminates in an adaptive gas sampling frequency strategy. This adaptive strategy is compared against the sampling frequency that has been developed based on operational considerations. Gas sampling will provide information on the presence of residual water (and byproducts associated with its reactions and decomposition) and breach of cladding, which could inform the decision of when to open the project cask.

  16. McNary-John Day Transmission Line Project, Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-30

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS

  17. EIS-0370: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0370: Draft Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Draft Environmental ...

  18. EIS-0382: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides...

  19. EA-1902: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Draft Environmental Assessment EA-1902: Draft Environmental Assessment Northern Wind Project, Roberts County, South Dakota DOE's Western Area Power Administration issued a draft ...

  20. EA-1966: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1966: Draft Environmental Assessment Sunflower Wind Project, Hebron, North Dakota Western Area Power Administration issued a Draft EA that...

  1. EIS-0414: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement and Notice of Public Hearing | Department of Energy 14: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public

  2. EIS-0491: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0491: Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory ...

  3. EA-1974: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1974: Draft Environmental Assessment Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon Bonneville Power Administration ...

  4. Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation

    Broader source: Energy.gov [DOE]

    In support of the Administration’s all-of-the-above energy strategy, the Department of Energy issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the U.S. that avoid, reduce, or sequester greenhouse gases.

  5. EIS-0499: Great Northern Transmission Line Project, Minnesota...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0499: Great Northern Transmission Line Project, Minnesota Summary This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to ...

  6. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  7. EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colusa and Sutter Counties, California EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California Summary Western Area Power ...

  8. Southline Transmission Line Project - Volume 1 Front Matter

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Infrastructure Program TPE total potential effect tpy ton(s) per year UAS FTC Unmanned Aircraft Systems Flight Test Center Southline Transmission Line Project Final ...

  9. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...

    Energy Savers [EERE]

    Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental...

  10. DOE Issues Draft Request for Proposals for the West Valley Demonstration Project Supplemental Environmental Impact Statement Support Service

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposals (RFP) for the West Valley Demonstration Project Supplemental Environmental Impact Statement (WVDP-SEIS) procurement that will provide support to the U.S. Department of Energy (DOE) West Valley Demonstration Project (WVDP), and the New York State Energy Research and Development Authority (NYSERDA) in developing a Supplemental Environmental Impact Statement for the WVDP and Western New York Nuclear Service Center.

  11. Lane-Wendson No. 1 Transmission Line Rebuild Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lane-Wendson No. 1 Transmission Line Rebuild Project Finding of No Significant Impact and Floodplain and Wetland Statement of Findings 1 In cooperation with the Bureau of Land Management Lane-Wendson No. 1 Transmission Line Rebuild Project Finding of No Significant Impact and Floodplain and Wetland Statement of Findings DEPARTMENT OF ENERGY Bonneville Power Administration DOE/EA-1952 April 2016 _____________________________________________________________________________________________________

  12. Draft Advanced Fossil Solicitation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal loan guarantee solicitation announcement -- Advanced Fossil Energy Projects. Microsoft Word - Draft Advanced Fossil Solicitation Final Draft.1 (383.34 KB) More Documents & ...

  13. Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation

    Broader source: Energy.gov [DOE]

    In support of the Administration’s all-of-the-above energy strategy, the Department of Energy issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the U.S. that avoid, reduce, or sequester greenhouse gases. When finalized, the solicitation is expected to make as much as $4 billion in loan guarantees available to help commercialize technologies that may be unable to obtain full commercial financing.

  14. Hellsgate Winter Range Mitigation Project; Long-term Management Plan, Project Report 1993, Final Draft.

    SciTech Connect (OSTI)

    Berger, Matthew T.

    1994-01-01

    A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.

  15. Northern Pass Transmission Line Project Environmental Impact Statement:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 | Department of Energy Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 -

  16. EIS-0337: Draft Environmental Impact Statement | Department of...

    Energy Savers [EERE]

    EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management ...

  17. Plains & Eastern Clean Line Project Proposal for New or Upgraded

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 | Department of Energy Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy

  18. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    SciTech Connect (OSTI)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments.

  19. Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed New England Clean Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113- Jun. 12, 2015

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of the “Draft Environmental Impact Statement for the New England Clean Power Link Transmission Line Project” (DOE/EIS-0503) for public review and comment.

  20. EIS-0486: Plains & Eastern Clean Line Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

  1. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  2. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    2012-01-01

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  3. EA-1972: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1972: Draft Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power ...

  4. EA-1931: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power ...

  5. Biomass 2014 Draft Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2014 Draft Agenda Biomass 2014 Draft Agenda The following document is a draft agenda for the Biomass 2014: Growing the Future Bioeconomy conference. Biomass 2014 Draft Agenda (337.42 KB) More Documents & Publications Bioproducts to Enable Biofuels Workshop Agenda Bioenergy 2015 Agenda 2015 Project Peer Review Program Booklet

  6. Sierra Pacific Power Company Alturas Transmission Line Project. Final environmental impact report/environmental impact statement, Volume I

    SciTech Connect (OSTI)

    1995-11-01

    This Environmental Impact Report/Environmental Impact Statement (EIR/S) describes the environmental setting and consequences of the construction and operation of the proposed Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCo) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power. This document was prepared by the California Public Utilities Commission (CPUC) and the U.S. Department of the Interior, Bureau of Land Management (BLM), pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), respectively. The purpose of this joint EIR/S is to report the results of the CPUC`s and BLM`s independent assessment of the potential environmental impacts that would result from the construction, operation, and maintenance of the proposed Alturas Transmission Line Project. The impact analysis is accompanied by the identification of feasible mitigation measures which, if incorporated into the project, would avoid or minimize impacts. This EIR/S also assesses alternatives to the Proposed Project and identifies those with the potential to eliminate or minimize impacts. This document considers comments made by agencies and the general public during the public scoping and Draft EIR/S comment periods.

  7. EA-1945: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1945: Draft Environmental Assessment Northern Mid-Columbia Joint Project, Douglas and Chelan Counties, Washington Bonneville Power Administration (BPA) issued a Draft...

  8. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County, Colorado...

  9. EIS-0143: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Impact Statement EIS-0143: Draft Environmental Impact Statement Eugene-Springfield Area Planning Project PDF icon EIS-0143-DEIS.pdf More Documents & ...

  10. EIS-0450: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada This EIS, being ...

  11. EIS-0439: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an...

  12. EIS-0488: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the availability of the Draft EIS ...

  13. EIS-0394: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0394: Draft Environmental Impact Statement FutureGen Project The EIS provides information about the potential environmental impacts of the ...

  14. EIS-0355: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement ... Uranium Mill Tailings Remedial Action Ground Water Project (DOEEIS-0198, October 1996). ...

  15. EIS-0438: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0438: Draft Environmental Impact Statement Interconnection of the Proposed Hermosa West Wind Farm Project, Albany County, WY This EIS ...

  16. EIS-0488: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with ...

  17. EIS-0460: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a ...

  18. EIS-0377: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0377: Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project This EIS evaluates the potential environmental...

  19. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    77: Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County,...

  20. EA-1862: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin Comment Period Ends: 9...

  1. EA-1995: Draft Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Assessment EA-1995: Draft Environmental Assessment Trestle Bay Ecosystem Restoration Project, Clatsop County, Oregon The U.S. Army Corps of Engineers issued a ...

  2. EA-1923: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Assessment EA-1923: Draft Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA ...

  3. Department of Energy Issues Draft Renewable Energy and Efficient...

    Energy Savers [EERE]

    Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy ...

  4. EIS-0445: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of the Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia Notice of Availability of Draft...

  5. EA-1993: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Assessment EA-1993: Draft Environmental Assessment Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas The proposed action ...

  6. EA-1901: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This EA ...

  7. EA-1860: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 92...

  8. EA-1829: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI For more information, contact: Mr. Jesse Garcia NEPA...

  9. EIS-0441: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    a Draft Environmental Impact Statement Mohave County Wind Farm Project, Mohave County, Arizona EPA announces the availability of BLM's Draft Environmental Impact Statement for the...

  10. EIS-0414: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC ...

  11. EA-1809: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1809: Draft Environmental Assessment White Earth Nation Wind Energy Project II Becker and Mahnomen Counties, MN This EA evaluates the potential...

  12. EA-1917: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Draft Environmental Assessment EA-1917: Draft Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates Northwest National Marine Renewable ...

  13. EIS-0413: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the...

  14. EIS-0404: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0404: EPA Notice of Availability of the Draft Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California...

  15. EIS-0501: EPA Notice of Availability of Draft Environmental Impact...

    Energy Savers [EERE]

    EIS-0501: EPA Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana EPA announced the availability of a Draft EIS, ...

  16. Microsoft Word - Kalispell_Draft_EA_160105.docx

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Kalispell-Kerr Transmission Line Rebuild Project Draft Environmental Assessment February 2015 DOE/EA-1961 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose of and Need for the Proposed Action ............................................................................... 1-1 1.1 Need for Action ............................................................................................................................ 1-1 1.2 Purposes of Action

  17. U.S. Department of Energy Responses to Public Comments on the Draft Waste- Incidental-to-Reprocessing Evaluation for the West Valley Demonstration Project Concentrator Feed Makeup Tank and Melter Feed Hold Tank

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) is providing responses to the comments received from the public and from state and county agencies on the West Valley Demonstration Project (WVDP) Draft Waste-Incidental-to-Reprocessing (WIR) Evaluation for the Concentrator Feed Makeup Tank (CFMT) and the Melter Feed Hold Tank (MFHT), referred to hereafter as the Draft Evaluation.

  18. Draft - DOE G 415.1-2, Information Technology Project Execution Model Guide for Small and Medium Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The Guide was developed to provide project management principles and guidelines to small and medium projects that fall outside the scope of DOE O 415.1, Information Technology Project Management, dated 12-3-12.

  19. Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-16

    Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would

  20. EIS-0463: Revision to EPA Notice Of Availability Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Revision to EPA Notice Of Availability Draft Environmental Impact Statement EIS-0463: Revision to EPA Notice Of Availability Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire This Notice of Availability was first published in the Federal Register on July 31, 2015. The Notice was amended in the October 9, 2015, Federal Register to extend the comment period to December 31, 2015. For more information, including possible

  1. DRAFT - DOE G 413.3-15, Department of Energy Guide for Project Execution Plans

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    The proposed revision to this Department of Energy Guide focuses on updating terminology and references, and alignment with Secretarial policy memoranda on project management issued since the last update to DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets.

  2. ESPC ENABLE Draft Task Order

    Broader source: Energy.gov [DOE]

    Document provides a draft for an agency to use when forming an ESPC ENABLE contract and making a task order award. This draft task order provides the framework for a contract that agencies and energy service companies can tailor to the particular needs of each site or project.

  3. MCR Jetties Rehab Draft EA

    Office of Environmental Management (EM)

    C - SECTION 404(b)(1) Lower Yellowstone Intake Fish Passage EIS Draft Section 404(b)(1) Analysis Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft Appendix C Section 404(b)(1) Analysis May 2016 i Contents 1 Introduction ..............................................................................................................................1 1.1 Background .......................................................................................................................1

  4. Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report

    SciTech Connect (OSTI)

    Gasper, John R.; Veselka, Thomas D.; Mahalik, Matthew R.; Hayse, John W.; Saha, Samrat; Wigmosta, Mark S.; Voisin, Nathalie; Rakowski, Cynthia; Coleman, Andre; Lowry, Thomas S.

    2014-05-19

    This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

  5. Comment Listing Response to Draft REEE Solicitation FINAL | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Comment Listing Response to Draft REEE Solicitation FINAL Comment Listing Response to Draft REEE Solicitation FINAL Comment ListingResponse_REEE Solicitation_final.pdf (566.28 KB) More Documents & Publications Draft Advanced Fossil Energy Projects Solicitation Public Comments Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation DOE-LPO_Email-Update_001_Through_11

  6. EIS-0486: Plains & Eastern Clean Line Transmission Project |...

    Broader source: Energy.gov (indexed) [DOE]

    Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the...

  7. Request for Proposals for New or Upgraded Transmission Line Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice ... Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice ...

  8. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Delaware | Department of Energy 5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, 2011 EIS-0465: Notice of Intent to Prepare an Environmental Impact Statement Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware February 4, 2011 EIS-0465: Announcement of Public Scoping Meetings Construction of Phase II of

  9. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...

    Energy Savers [EERE]

    No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the...

  10. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    SciTech Connect (OSTI)

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to support

  11. EIS-0377: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power...

  12. Draft Air Pathway Report: Phase 1 of the Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Not Available

    1990-07-20

    This report summarizes the air pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project, conducted by Battelle staff at the Pacific Northwest Laboratory under the direction of an independent Technical Steering Panel. The HEDR Project is estimating historical radiation doses that could have been received by populations near the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the air-pathway dose reconstruction sought to determine whether dose estimates could be calculated for populations in the 10 counties nearest the Hanford Site from atmospheric releases of iodine-131 from the site from 1944--1947. Phase 1 demonstrated the following: HEDR-calculated source-term estimates of iodine-131 releases to the atmosphere were within 20% of previously published estimates; calculated vegetation concentrations of iodine-131 agree well with previously published measurements; the highest of the Phase 1 preliminary dose estimates to the thyroid are consistent with independent, previously published estimates of doses to maximally exposed individuals; and relatively crude, previously published measurements of thyroid burdens for Hanford workers are in the range of average burdens that the HEDR model estimated for similar reference individuals'' for the period 1944--1947. 4 refs., 10 figs., 9 tabs.

  13. Section 1222 Program - Proposed Plains & Eastern Clean Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 1222 Program - Proposed Plains & Eastern Clean Line ... through the Southwestern Power Administration ... NEPA Website, and through other channels of communication. ...

  14. EIS-0317: Kangley-Echo Lake Transmission Line Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

  15. EIS-0474: Southline Transmission Line Project; Arizona and New...

    Broader source: Energy.gov (indexed) [DOE]

    consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing...

  16. EIS-0499: Great Northern Transmission Line Project, Minnesota...

    Broader source: Energy.gov (indexed) [DOE]

    and connect a new 883-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau,...

  17. EIS-0463: Northern Pass Transmission Line Project, New Hampshire...

    Broader source: Energy.gov (indexed) [DOE]

    permit to Northern Pass Transmission, LLC, to construct, operate, maintain, and connect a new electric transmission line across the U.S.-Canada border in northern New Hampshire. ...

  18. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 1, Summary

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western`s power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western`s firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action altemative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  19. Sustainable biomass products development and evaluation, Hamakua project. Final draft report

    SciTech Connect (OSTI)

    1998-05-01

    The PICHTR Sustainable Biomass Energy Program was developed to evaluate the potential to cultivate crops for energy production as an alternative use of lands made available by the closing of large sugar plantations. In particular, the closing of the Hamakua Sugar Company on the island of Hawaii brought a great deal of attention to the future of agriculture in this region and in the state. Many options were proposed. Several promising alternatives had been proposed for cane lands. These included dedicated feedstock supply systems (DFSS) for electrical energy production, cultivation of sugarcane to produce ethanol and related by-products, and the production of feed and crops to support animal agriculture. Implementation of some of the options might require preservation of large tracts of land and maintenance of the sugar mills and sugar infrastructure. An analysis of the technical, financial, and other issues necessary to reach conclusions regarding the optimal use of these lands was required. At the request of the Office of State Planning and Senator Akaka`s office, the Pacific International Center for High Technology Research (PICHTR) established and coordinated a working group composed of state, county, federal, and private sector representatives to identify sustainable energy options for the use of idle sugar lands on the island of Hawaii. The Sustainable Biomass Energy Program`s Hamakua Project was established to complete a comprehensive evaluation of the most viable alternatives and assess the options to grow crops as a source of raw materials for the production of transportation fuel and/or electricity on the island of Hawaii. The motivation for evaluating biomass to energy conversion embraced the considerations that Hawaii`s energy security would be improved by diversifying the fuels used for transportation and reducing dependency on imported fossil fuels. The use of waste products as feedstocks could divert wastes from landfills.

  20. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild Project; Lane

    Energy Savers [EERE]

    County, Oregon | Department of Energy 1967: Hills Creek-Lookout Point Transmission Line Rebuild Project; Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild Project; Lane County, Oregon Summary Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115-kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane

  1. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project; Kalispell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional information is available on the project website, http:efw.bpa.govenvironmentalservicesDocumentLibraryKALISPELLKERR. PUBLIC COMMENT OPPORTUNITIES No public ...

  2. EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

  3. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line that would connect a new switchyard with the existing Witten Substation. ...

  4. EIS-0106: Great Falls-Conrad Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

  5. LLNL line-item construction projects Master Site Plan

    SciTech Connect (OSTI)

    1996-04-15

    This interim submittal is an updated 1996 overview of the Master Plan based on the 1995 LLNL Site Development Plan, illustrating the future land use considerations, and the locations of proposed facilities as documented through the line item development process and keyed to the summary table. The following components in addition to the line-item proposals remain key elements in the implementation strategy of the Master Plan: personnel migration, revitalization, space reduction, classified core contraction, utility systems, and environmental restoration.

  6. EIS-0492: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0492: Draft Environmental Impact Statement Oregon LNG Export Project (Warrenton, OR) and Washington Expansion Project (between Sumas and Woodland, WA) Federal Energy Regulatory Commission, with DOE as a cooperating agency, issued a Draft EIS that analyzes the potential environmental impacts of the proposed Oregon LNG Terminal and Pipeline Project and Washington Expansion Project. For more information on this project, see the project page:

  7. FINAL DRAFT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT DMEAST #11461499 v6 M E M O R A N D U M To: National Renewable Energy Laboratories From: R. Thomas Hoffmann Darin Lowder Ballard Spahr Andrews & Ingersoll LLP Date: June 30, 2009 Re: Residential Financing Options for Solar Power in Salt Lake County, Utah As part of our engagement with the National Renewable Energy Laboratories conducting the Salt Lake County Solar America Residential Finance Study, we have drafted this report summarizing the tools and mechanisms available for

  8. EIS-0374: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0374: Draft Environmental Impact Statement Klondike IIIBiglow Canyon Project Wind Integration Project BPA has been asked by PPM Energy, Inc. to...

  9. EIS-0427: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by...

  10. Department of Energy Issues Draft Loan Guarantee Solicitation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Loan Guarantee Solicitation for Advanced Nuclear Energy Projects Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects September 30, ...

  11. EIS-0481: DOE Notice of Availability of Draft Programmatic Environment...

    Energy Savers [EERE]

    31715. For more information on this project, see the project page: http:energy.govnode361381. Download Document PDF icon EIS-0481: DOE Notice of Availability of Draft...

  12. EIS-0433: DOE Comments on the Draft Environmental Impact Statement...

    Broader source: Energy.gov (indexed) [DOE]

    XL Project. Comments on the Draft Environmental Impact Statement for the Keystone XL Pipeline Project, DOEEIS-433 (July 2010) More Documents & Publications EIS-0433: Final...

  13. Department of Energy Issues Draft Renewable Energy and Efficient...

    Office of Environmental Management (EM)

    Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects ...

  14. EIS-0397: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0397: Draft Environmental Impact Statement Lyle Falls Fish Passage Project The underlying need for the project is to improve fish passage to...

  15. EIS-0418: Draft Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    Impact Statement EIS-0418: Draft Environmental Impact Statement South Dakota PrairieWinds Project For more information, see the project page: http:energy.govnode300907....

  16. EIS-0492: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0492: EPA Notice of Availability of Draft Environmental Impact Statement Oregon LNG ... the proposed Oregon LNG Terminal and Pipeline Project and Washington Expansion Project. ...

  17. EIS-0492: FERC Notice of Availability of Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0492: FERC Notice of Availability of Draft Environmental Impact Statement Oregon LNG ... the proposed Oregon LNG Terminal and Pipeline Project and Washington Expansion Project. ...

  18. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  19. EIS-0124: Conrad-Shelby Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

  20. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  1. Los Alamos Legacy Cleanup Contract Draft Request for Proposal | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Legacy Cleanup Contract Draft Request for Proposal Los Alamos Legacy Cleanup Contract Draft Request for Proposal David Rhodes, DOE EM-LA, Presented on the LLCC Draft Request for Proposal. LLCC Draft RFP - July 27, 2016 (8.09 MB) More Documents & Publications LANS Bridge Contract EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental Management Update on Procurement Opportunities and Acquisition Process

  2. EA-2018: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    18: Draft Environmental Assessment EA-2018: Draft Environmental Assessment Front Range-Midway Solar Interconnection Project; El Paso County, Colorado Western Area Power Administration issued a draft EA that analyzes the potential environmental impacts of interconnecting a proposed photovoltaic solar facility adjacent to Western's existing Midway Substation in El Paso County, Colorado. For more information on this project, see: www.energy.gov/node/1907551. Download Document EA-2018: Draft

  3. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Michael Lane

    2010-01-01

    Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

  4. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Michael Lane

    Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

  5. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  6. Public Hearings on Northern Pass Draft EIS Announced

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has announced public hearings to receive comments on the Draft EIS (DOE/EIS–0463). The Draft EIS evaluates the potential environmental impacts of DOE’s proposed Federal action of issuing a Presidential permit to Northern Pass LLC (the Applicant) to construct, operate, maintain, and connect a new electric transmission line across the U.S./Canada border in northern New Hampshire. For the convenience of the public, DOE in conjunction with the New Hampshire SEC will conduct public hearings to provide the public with information on the proposed project and an opportunity for the public to provide oral and written comments and to ask questions concerning the project on March 7 and March 10, 2016.

  7. EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration (Western) and the Sacramento Municipal Utility District (SMUD) are preparing a joint EIS/environmental impact report (EIR) –under, respectively, NEPA and the California Environmental Quality Act – that analyzes the potential environmental effects of the proposed new 500-kilovolt Colusa-Sutter (CoSu) Transmission Line Project. The proposed transmission line would interconnect the California-Oregon Transmission Project transmission system, near either Arbuckle or Maxwell, California, to the Central Valley Project transmission system near Yuba City, California. Western’s proposed action is to construct the CoSu Project and modify Western’s facilities to accommodate the new line; SMUD’s proposed action is to fund the proposal.

  8. Notice of Availability (NOA) for the Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    New England Clean Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113 - Jun. 12, 2015 Notice of Availability (NOA) for the Draft Environmental Impact ...

  9. EIS-0399: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a...

  10. Craig-Bonanza 345-kV Transmission Line Project: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Department of Energy (DOE), and the Western Area Power Administration (Western) proposes to construct and maintain a 345- kilovolt (kV) transmission line between Craig, Colorado, and Bonanza in eastern Utah. The project began in 1986 and construction is scheduled to be completed in 1989. The project, known as the Craig-Bonanza 345-kV Transmission Line Project (Project), will be located in Moffat and Rio Blanco counties in Colorado and Uintah County in Utah. Western has the lead role for project development and management, including environmental studies and construction. Cooperating federal agencies include the Bureau of Land Management (BLM), Rural Electrification Administration, US Fish and Wildlife Service, and Bureau of Indian Affairs. This environmental assessment was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ), the DOE and the BLM. 360 refs., 33 figs., 21 tabs.

  11. Sacramento Area Voltage Support Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-11-15

    The Western Area Power Administration's Central Valley Project transmission system forms an integral part of the interconnected Sacramento area transmission grid. Western is contractually responsible to oversee that the system is operated in accordance with strict reliability standards. Growth in the greater Sacramento, California area and power imported from generation outside the region, have increased the demand on the interconnected electric transmission system, leading to transmission system overloads and reducing the reliability and security of the area power system. Western has prepared this Sacramento Area Voltage Support (SVS) Draft Environmental Impact Statement (EIS) in compliance with Federal laws, regulations and guidelines, principally the ''National Environmental Policy Act'' (NEPA). This Draft EIS evaluates the potential environmental effects of physical improvements to the area's power system. Enhancements are needed to improve system reliability and provide voltage support for the Sacramento area. The results of public scoping meetings, workshops, meetings with agencies, and earlier studies by Western and area utilities helped to develop a range of alternatives for analysis. The Proposed Action involves: Constructing a new double-circuit, 230-kV transmission line paralleling the existing double-circuit, 230-kV line from the O'Banion Substation to the Elverta Substation; Realigning a portion of the existing Cottonwood-Roseville single-circuit, 230-kV transmission line north of Elverta Substation; and Reconductoring the existing double-circuit, 230-kV transmission line from the Elverta Substation to the Tracy Substation. Public Hearings on the Draft EIS will be held between December 9-12, 2002. Comments on this Draft EIS are encouraged and should be sent to Ms. Loreen McMahon (above). Comments must be received by December 30, 2002.

  12. Request for Proposals for New or Upgraded Transmission Line Projects Under

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 | Department of Energy Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 FRN Request for

  13. Department of Energy Issues Draft Renewable Energy and Efficient Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Solicitation to Foster Clean Energy Innovation | Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation April 16, 2014 - 1:35pm Addthis In support of the Administration's all of the above energy strategy, the Department of Energy issued a draft loan guarantee solicitation today for

  14. EIS-0491: FERC Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy FERC Notice of Availability of Draft Environmental Impact Statement EIS-0491: FERC Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory Commission issued a notice of availability of a Draft EIS that analyzes the potential environmental impacts of a proposal to construct and operate the Lake Charles Liquefaction Project. For more information on this project,

  15. EA-2043: Draft Environmental Assesment | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Assesment EA-2043: Draft Environmental Assesment EA-2043: Columbia Stock Ranch Section 536 Ecosystem Restoration Project; Columbia County, Oregon The U.S. Army Corps of Engineers issued a draft EA that analyzes the potential environmental impacts of a proposed tidal floodplain ecosystem restoration project at Columbia Stock Ranch, located in Columbia County, Oregon. Bonneville Power Administration, a cooperating agency, proposes to provide funding for the project. For more

  16. EA-1896: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, ND

  17. Extension of Comment Period on the Draft Integrated, Interagency...

    Energy Savers [EERE]

    of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment...

  18. EIS-0409: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Kemper County Integrated Gasification Combined-Cycle (IGCC) Project, Mississippi Notice of Availability for the Draft Environmental Impact Statement Kemper County Integrated...

  19. EIS-0489: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) EPA announced the availability of a Draft EIS prepared by the Federal...

  20. EIS-0515: EPA Notice of Availability of Supplemental Draft Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Environmental Protection Agency announced the availability of a Supplemental Draft EISEIR for the Bay Delta Conservation Plan. For more information on this project, see the ...

  1. EIS-0491: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    EPA Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana The Environmental Protection Agency issued a...

  2. EIS-0491: FERC Notice of Availability of Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory Commission issued a notice of availability of a Draft EIS that analyzes the potential...

  3. EIS-0407: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas PDF icon E9-22920.pdf More Documents &...

  4. EIS-0464: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0464: DOE Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, ...

  5. EIS-0284: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits electronic access to certain NEPA documents ...

  6. EIS-0377: Notice of Availability of the Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    Area Power Administration (Western) announces the availability of the Supplemental Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement for public...

  7. EA-1812: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips ... Renewable Energy Deployment Program to Phillips County for design, permitting, and ...

  8. EIS-0444: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    of the Draft Environmental Impact Statement and Public Hearing Notice for the Texas Clean Energy Project, near Odessa, Ector County, Texas, DOEEIS-0444 (March 2011 - 76...

  9. EIS-0414: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez ...

  10. EIS-0421: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28...

  11. EIS-0445: Postponement of Public Hearing on the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hearing on the Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia Postponement of Public Hearing on...

  12. EIS-0464: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas The...

  13. EIS-0445: DOE Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    of the Draft Environmental Impact Statement for the Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia, DOEEIS-0445 (March 2011 - 76 FR...

  14. EIS-0526: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0526: Draft Environmental Impact Statement Lower Yellowstone Intake Diversion Dam Fish ... the Lower Yellowstone Intake Diversion Dam Fish Passage Project, a proposal to improve ...

  15. EIS-0397: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement Lyle Falls Fish Passage Project To Improve Fish Passage to Habitat in the Upper Part of the Watershed,...

  16. EA-1976D: Notice of Availability of Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Availability of Draft Environmental Assessment Emera CNG, LLC Compressed Natural Gas Project, Florida DOE's National Energy Technology Laboratory (NETL) announces the...

  17. EIS-0489: FERC Notice of Availability of Draft Environmental...

    Office of Environmental Management (EM)

    of a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate the Jordan Cove Liquefaction and Pacific Connector Pipeline Projects. ...

  18. EA-1951: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CX-005846: Categorical Exclusion Determination EA-1912: Draft Environmental Assessment EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA...

  19. EA-1903: Notice of Availability of Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1903: Notice of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office announces the ...

  20. EA-1809: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen Counties, MN DOE announces the...

  1. EIS-0487: Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    EIS-0487: Notice of Availability of Draft Environmental Impact Statement Freeport LNG ... the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand ...

  2. EIS-0487: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    Freeport LNG Liquefaction Project, Brazoria County, Texas EPA announces the availability of the Draft Environmental Impact Statement for the Freeport LNG Liquefaction ...

  3. EIS-0444: EPA Notice of Availability of the Draft Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    - Draft Environmental Impact Statement Texan Clean Energy Project, Construction and Operation of a Coal-Based Electric Power Generation and Chemicals Production Plant, Odessa,...

  4. Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

  5. Magnolia and KMLP Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Magnolia LNG and Lake Charles Expansion Projects Draft Environmental Impact Statement Magnolia LNG, LLC and Kinder Morgan Louisiana Pipeline LLC FERC Docket Nos. CP14-347-000 and ...

  6. Project W-314 sn-634 transfer line a-b to ax-b acceptance for beneficial use

    SciTech Connect (OSTI)

    Warnick, T. L.

    1997-09-29

    Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

  7. EIS-0399: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line...

  8. EA-2019: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: Draft Environmental Assessment EA-2019: Draft Environmental Assessment Lake Erie Connector Project DOE issued a Draft EA that evaluates the potential environmental impacts of issuing a Presidential permit for a new, 72-mile long, 1,000 megawatt, high-voltage direct current, electric transmission system that would cross the international border with Canada in Lake Erie and connect to the proposed Erie Converter Station in Conneaut Township, Pennsylvania. For more information on this project,

  9. EIS-0488: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 8: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the availability of the Draft EIS for the Cameron Liquefaction Project, Cameron Parish, Louisiana. The Federal Energy Regulatory Commission (FERC) proposes to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy

  10. EIS-0515: EPA Notice of Availability of Supplemental Draft Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0515: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement Bay Delta Conservation Plan; Sacramento-San Joaquin Delta, California The Environmental Protection Agency announced the availability of a Supplemental Draft EIS/EIR for the Bay Delta Conservation Plan. For more information on this project, see the project page:

  11. EIS-0487: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0487: Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand an existing LNG import terminal and associated facilities in Brazoria County, Texas, to

  12. EIS-0498: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8: Draft Environmental Impact Statement EIS-0498: Draft Environmental Impact Statement Magnolia LNG and Lake Charles Expansion Projects, Calcasieu Parish, Louisiana The Federal Energy Regulatory Commission (FERC) issued a Draft EIS that analyzes the potential environmental impacts of a proposal to construct and operate the proposed Magnolia LNG Project, an on-land liquefied natural gas (LNG) terminal and associated facilities near Lake Charles, Louisiana. The EIS also analyzes the potential

  13. EIS-0515: Supplemental Draft Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5: Supplemental Draft Environmental Impact Statement EIS-0515: Supplemental Draft Environmental Impact Statement Bay Delta Conservation Plan; Sacramento-San Joaquin Delta, California The Supplemental Draft EIS is posted (multiple files) at http://baydeltaconservationplan.com/2015PublicReview/PublicReviewRDEIRSD.... For more information on this project, see the project page: http://energy.gov/node/1050986. More Documents & Publications EIS-0515: EPA Notice of Availability of

  14. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  15. MITIGATION ACTION PLAN FOR THE PLAINS & EASTERN CLEAN LINE TRANSMISSION PROJECT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MITIGATION ACTION PLAN FOR THE PLAINS & EASTERN CLEAN LINE TRANSMISSION PROJECT DOE/EIS-0486 MARCH 2016 3 1 INTRODUCTION The U.S. Department of Energy (DOE) National Environmental Policy Act (NEPA) Implementing Procedures (Title 10 Code of Federal Regulations [CFR] 1021.331) require completion of a mitigation action plan (MAP) following each Environmental Impact Statement (EIS) and its associated Record of Decision (ROD) to address mitigation commitments expressed in the ROD. The DOE Notice

  16. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    SciTech Connect (OSTI)

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  17. EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental...

    Broader source: Energy.gov (indexed) [DOE]

    on this project, see the project webpage: http:energy.govnode299815. Download Document EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental Environmental Impact...

  18. EIS-0526: USACE and BOR Notice of Availability of the Draft Environmen...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana The ... for a Draft EIS for the Lower Yellowstone Intake Diversion Dam Fish Passage Project. ...

  19. DOE Issues Draft Request for Proposals for the West Valley Demonstrati...

    Energy Savers [EERE]

    West Valley Demonstration Project Supplemental Environmental Impact Statement Support Service DOE Issues Draft Request for Proposals for the West Valley Demonstration Project ...

  20. EA-1950: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1950: Draft Environmental Assessment Bonneville Power Administration prepared a draft EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington. EA-1950-DEA-2013.pdf (7.21 MB) More Documents & Publications EA-1950: Finding of No Significant Impact and Mitigation Action Plan EA-1950: Final

  1. Selected Area Fishery Evaluation Project Economic Analysis Study Final Report, Final Draft Revision 4: November 10, 2006.

    SciTech Connect (OSTI)

    Bonneville Power Administration; Washington Department of Fish and Wildlife; Oregon Department of Fish and Wildlife

    2006-11-01

    The purpose of this Study is to provide an economic review of current and proposed changes to the Select Area Fishery Evaluation Project (SAFE or Project). The Study results are the information requested in comments made on the Project by a joint review dated March 2005 by the Northwest Power and Conservation Council (NPCC) Independent Scientific Review Panel (ISRP) and Independent Economic Analysis Board (IEAB). North et al. (2006) addressed technical questions about operations and plans, and this report contains the response information for comments concerning Project economics. This report can be considered an economic feasibility review meeting guidelines for cost-effective analysis developed by the IEAB (2003). It also contains other economic measurement descriptions to illustrate the economic effects of SAFE. The SAFE is an expansion of a hatchery project (locally called the Clatsop Economic Development Council Fisheries Project or CEDC) started in 1977 that released an early run coho (COH) stock into the Youngs River. The Youngs River entrance to the Columbia River at River Mile 12 is called Youngs Bay, which is located near Astoria, Oregon. The purpose of the hatchery project was to provide increased fishing opportunities for the in-river commercial fishing gillnet fleet. Instead of just releasing fish at the hatchery, a small scale net pen acclimation project in Youngs Bay was tried in 1987. Hirose et al. (1998) found that 1991-1992 COH broodstock over-wintered at the net pens had double the smolt-to-adult return rate (SAR) of traditional hatchery release, less than one percent stray rates, and 99 percent fishery harvests. It was surmised that smolts from other Columbia River hatcheries could be hauled to the net pens for acclimation and release to take advantage of the SAR's and fishing rates. Proposals were tendered to Bonneville Power Administration (BPA) and other agencies to fund the expansion for using other hatcheries smolts and other off

  2. EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement | Department of Energy 3-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement Keystone XL Project EPA announces the availability fo the Keystone XL Project Draft Supplemental Environmental Impact Statement. EIS-0433-S1-DSEIS-EPANOA-2013.pdf (194.56 KB) More Documents & Publications EIS-0451: EPA Notice of Availability of a Draft

  3. EIS-0451: EPA Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0451: EPA Notice of Availability of a Draft Environmental Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho EPA announces the availability of the Hooper Springs Project, Caribou County, Idaho Draft Environmental Impact Statement. EIS-0451-DEIS-EPANOA-2013.pdf (194.56 KB) More Documents & Publications EIS-0433-S1: EPA Notice of Availability of a Draft

  4. EIS-0515: BOR and FWS Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 5: BOR and FWS Notice of Availability of Draft Environmental Impact Statement EIS-0515: BOR and FWS Notice of Availability of Draft Environmental Impact Statement BOR and FWS announced the availability of the Draft Bay Delta Conservation Plan and Natural Community Conservation Plan (BDCP) and Draft BDCP EIR/EIS. For more information on this project, see the project page: http://energy.gov/node/1050986. Download Document EIS-0515: BOR and FWS Notice of

  5. Mixed and Low-Level Waste Treatment Facility project. Appendix A, Environmental and regulatory planning and documentation: Draft

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    Mixed and low-level wastes generated at the Idaho National Engineering Laboratory (INEL) are required to be managed according to applicable State and Federal regulations, and Department of Energy Orders that provide for the protection of human health and the environment. The Mixed and Low-Level Waste Treatment Facility Project was chartered in 1991, by the Department of Energy to provide treatment capability for these mixed and low-level waste streams. The first project task consisted of conducting engineering studies to identify the waste streams, their potential treatment strategies, and the requirements that would be imposed on the waste streams and the facilities used to process them. This report, Appendix A, Environmental & Regulatory Planning & Documentation, identifies the regulatory requirements that would be imposed on the operation or construction of a facility designed to process the INEL`s waste streams. These requirements are contained in five reports that discuss the following topics: (1) an environmental compliance plan and schedule, (2) National Environmental Policy Act requirements, (3) preliminary siting requirements, (4) regulatory justification for the project, and (5) health and safety criteria.

  6. Phase I Archaeological Investigation Cultural Resources Survey, Hawaii Geothermal Project, Makawao and Hana Districts, South Shore of Maui, Hawaii (DRAFT )

    SciTech Connect (OSTI)

    Erkelens, Conrad

    1994-03-01

    This report details the archaeological investigation of a 200 foot wide sample corridor extending approximately 9 miles along the southern portion of Maui within the present districts of Hana and Makawao. A total of 51 archaeological sites encompassing 233 surface features were documented. A GPS receiver was used to accurately and precisely plot locations for each of the documented sites. Analysis of the locational information suggests that archaeological sites are abundant throughout the region and only become scarce where vegetation has been bulldozed for ranching activities. At the sea-land transition points for the underwater transmission cable, both Ahihi Bay and Huakini Bay are subjected to seasonal erosion and redeposition of their boulder shorelines. The corridor at the Ahihi Bay transition point runs through the Moanakala Village Complex which is an archaeological site on the State Register of Historic Places within a State Natural Area Reserve. Numerous other potentially significant archaeological sites lie within the project corridor. It is likely that rerouting of the corridor in an attempt to avoid known sites would result in other undocumented sites located outside the sample corridor being impacted. Given the distribution of archaeological sites, there is no alternative route that can be suggested that is likely to avoid encountering sites. A total of twelve charcoal samples were obtained for potential taxon identification and radiocarbon analysis. Four of these samples were subsequently submitted for dating and species identification. Bird bone from various locations within a lava tube were collected for identification. Sediment samples for subsequent pollen analysis were obtained from within two lava tubes. With these three sources of information it is hoped that paleoenvironmental data can be recovered that will enable a better understanding of the setting for Hawaiian habitation of the area. A small test unit was excavated at one habitation site

  7. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    SciTech Connect (OSTI)

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  8. Draft-O-Meter

    K-12 Energy Lesson Plans and Activities Web site (EERE)

    Students will learn an easy technique to measure the presence of drafts in their homes and classrooms.

  9. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  10. Microsoft Word - N01673_B100 AA final draft

    Office of Legacy Management (LM)

    Draft Building 100 Area Plume Management Alternatives Analysis March 2012 LMS/PIN/N01673 This page intentionally left blank LMS/PIN/N01673 Pinellas County, Florida, Site Environmental Restoration Project Draft Building 100 Area Plume Management Alternatives Analysis March 2012 This page intentionally left blank U.S. Department of Energy Draft Building 100 Area Plume Management Alternatives Analysis March 2012 Doc. No. N01673 Page i Contents Abbreviations

  11. EIS-0491: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0491: EPA Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana The Environmental Protection Agency issued a notice of availability of a Draft EIS prepared by the Federal Energy Regulatory Commission (with DOE as a cooperating agency) that analyzes the potential environmental impacts of a proposal to construct and

  12. EIS-0503: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 3: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0503: DOE Notice of Availability of Draft Environmental Impact Statement New England Clean Power Link Project, Vermont DOE announced the availability of the Draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Transmission Developers, Inc.-New England, to construct, operate, maintain, and connect a new 1000-megawatt electric

  13. EIS-0488: Notice of Availability Draft Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Availability Draft Environmental Impact Statement EIS-0488: Notice of Availability Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the

  14. EIS-0501: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Draft Environmental Impact Statement EIS-0501: Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana The Federal Energy Regulatory Commission prepared a Draft EIS that analyzes the potential environmental impacts of a proposal to construct and operate natural gas liquefaction and export facilities at the existing Golden Pass liquefied natural gas terminal in Jefferson County, Texas, and associated pipeline facilities in Texas and Louisiana. DOE is a

  15. EIS-0501: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0501: EPA Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana EPA announced the availability of a Draft EIS, prepared by Federal Energy Regulatory Commission that analyzes the potential environmental impacts of a proposal to construct and operate natural gas liquefaction and export facilities at the existing Golden Pass

  16. EIS-0501: Notice of Availability of Draft Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Notice of Availability of Draft Environmental Impact Statement EIS-0501: Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana The Federal Energy Regulatory Commission announced the availability of a Draft EIS that analyzes the potential environmental impacts of a proposal to construct and operate natural gas liquefaction and export facilities at the existing Golden Pass liquefied natural gas terminal in

  17. EIS-0333: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    33: Draft Environmental Impact Statement EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington This Draft Environmental Impact Statement (EIS) evaluates the environmental effects of BPA's Proposed Action to execute power purchase and interconnection agreements for the purpose of acquiring up to 50 average megawatts (aMW) (up to about 200 MW) of the project developer's proposed Maiden Wind Farm. DOE/EIS-0333, Bonneville Power Administration,

  18. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  19. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  20. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  1. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  2. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  3. EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004)

    Broader source: Energy.gov [DOE]

    A U.S. Department of Energy (DOE) Presidential permit is required to construct an electric transmission line across the U.S. international border. On February 27, 2001, Baja California Power, Inc. ...

  4. Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Solicitation presentation.pdf (892.68 KB) More Documents & Publications REEE Solicitation Public Meeting Presentation Renewable Energy & Energy Efficiency Projects: Loan Guarantee Solicitation

  5. EIS-0129: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0129: Draft Environmental Impact Statement New EnglandHydro-Quebec 450 kV Transmission Line Interconnection - Phase II PDF icon EIS-0129-DEIS.pdf More Documents & Publications ...

  6. EA-1949: FERC Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within

  7. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  8. Draft Tiered Rate Methodology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For Regional Dialogue Discussion Purposes Only Pre-Decisional Draft Tiered Rates Methodology March 7, 2008 Pre-decisional, Deliberative, For Discussion Purposes Only March 7,...

  9. EIS-0336: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement and Public Hearings | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Draft Environmental Impact

  10. The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

    2009-09-01

    The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

  11. The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Fenner, Marsha W; Liolios, Konstantinos; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Kyrpides, Nikos C.

    2007-12-31

    The Genomes On Line Database (GOLD) is a comprehensive resource of information for genome and metagenome projects world-wide. GOLD provides access to complete and ongoing projects and their associated metadata through pre-computed lists and a search page. The database currently incorporates information for more than 2900 sequencing projects, of which 639 have been completed and the data deposited in the public databases. GOLD is constantly expanding to provide metadata information related to the project and the organism and is compliant with the Minimum Information about a Genome Sequence (MIGS) specifications.

  12. EIS-0458: EPA Notice of Availability of Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft EPA/EIS No. 20110087, Topaz Solar Farm Project, Issuing a Loan Guarantee to Royal Bank of Scotland for Construction and Startup, San Luis Obispo County, CA

  13. Microsoft Word - BNRS_FERRY_3D_DEA_DRAFT_EA

    Energy Savers [EERE]

    protecting spawning. Kootenai River Habitat Restoration at Bonners Ferry Project Draft Environmental Assessment 10 * Suggestion to create community support through a public...

  14. FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution

    Broader source: Energy.gov [DOE]

    The Energy Department's Loan Programs Office is releasing a new draft loan guarantee solicitation for innovative and advanced fossil energy projects and facilities.

  15. Evaluation of a main steam line break with induced, multiple tube ruptures: A comparison of NUREG 1477 (Draft) and transient methodologies Palo Verde Nuclear Generating Station

    SciTech Connect (OSTI)

    Parrish, K.R.

    1995-09-01

    This paper presents the approach taken to analyze the radiological consequences of a postulated main steam line break event, with one or more tube ruptures, for the Palo Verde Nuclear Generating Station. The analysis was required to support the restart of PVNGS Unit 2 following the steam generator tube rupture event on March 14, 1993 and to justify continued operation of Units 1 and 3. During the post-event evaluation, the NRC expressed concern that Unit 2 could have been operating with degraded tubes and that similar conditions could exist in Units 1 and 3. The NRC therefore directed that a safety assessment be performed to evaluate a worst case scenario in which a non-isolable main steam line break occurs inducing one or more tube failures in the faulted steam generator. This assessment was to use the generic approach described in NUREG 1477, Voltage-Based Interim Plugging Criteria for Steam Generator Tubes - Task Group Report. An analysis based on the NUREG approach was performed but produced unacceptable results for off-site and control room thyroid doses. The NUREG methodology, however, does not account for plant thermal-hydraulic transient effects, system performance, or operator actions which could be credited to mitigate dose consequences. To deal with these issues, a more detailed analysis methodology was developed using a modified version of the Combustion Engineering Plant Analysis Code, which examines the dose consequences for a main steam line break transient with induced tube failures for a spectrum equivalent to 1 to 4 double ended guillotine U-tube breaks. By incorporating transient plant system responses and operator actions, the analysis demonstrates that the off-site and control room does consequences for a MSLBGTR can be reduced to acceptable limits. This analysis, in combination with other corrective and recovery actions, provided sufficient justification for continued operation of PVNGS Units 1 and 3, and for the subsequent restart of Unit 2.

  16. EA-1863: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest, Flagstaff, Arizona

  17. Draft Environmental Assessment on the Remote-handled Waste Disposition...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft Environmental Assessment on the Remote-handled Waste Disposition Project available for public review and comment The U.S. Department of Energy invites the public to review...

  18. EIS-0445: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Mason County, West Virginia near the town of New Haven. PDF icon EIS-0445-DEIS-Summary-20100.pdf PDF icon Mountaineer Commercial Scale Carbon Capture and Storage Project, Draft...

  19. EA-1925: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EA-1925: Draft Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon (DOI-BLM-OR-P040-2011-0021-EA; DOEEA-1925) Ormat Nevada, ...

  20. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  1. EA-1861: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1861: Draft Environmental Assessment Frito-Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of Federal grant funding to design, permit, and construct a biomass boiler house at the Frito-Lay North America (Frito-Lay) plant in Beloit, Wisconsin. Frito-Lay would construct and operate a new boilerhouse for a wood chip boiler and purchase wood fuel from regional suppliers (proposed project).

  2. EA-1970: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1970: Draft Environmental Assessment Fishermen's Atlantic City Windfarm, LLC Offshore Wind Demonstration Project, offshore Atlantic City, New Jersey DOE is proposing to provide funding to Fishermen's Atlantic City Windfarm, LLC to construct and operate up to six wind turbine generators, for an offshore wind demonstration project, approximately 2.8 nautical miles off the coast of Atlantic City, NJ. The proposed action includes a cable crossing from the turbines

  3. EA-1970: Notice of Availability of Draft Environmental Assessement |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Notice of Availability of Draft Environmental Assessement EA-1970: Notice of Availability of Draft Environmental Assessement Fishermen's Atlantic City Windfarm, LLC Offshore Wind Demonstration Project, offshore Atlantic City, New Jersey DOE is proposing to provide funding to Fishermen's Atlantic City Windfarm, LLC to construct and operate up to six wind turbine generators, for an offshore wind demonstration project, approximately 2.8 nautical miles off the coast of

  4. EIS-0451: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supplemental Draft Environmental Impact Statement EIS-0451: Supplemental Draft ... Bonneville Power Administration (BPA) BPA prepared a supplemental draft EIS to evaluate an ...

  5. Announcement of Change in Public Meeting Location for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department announces a change of location for the September 26, 2013 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. The meeting will be from 5 to 8 p.m.

  6. OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project

    Broader source: Energy.gov [DOE]

    On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

  7. EIS-0413: EPA Notice of Availability of a Draft Environmental Impact

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0409: Draft Environmental Impact Statement Kemper County IGCC Project This Draft EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding and possibly a loan guarantee for construction and operation of advanced power generation plant in Kemper County, Mississippi. The project was selected under DOE's Clean Coal Power Initiative to demonstrate IGCC technology. Mississippi Power also was

  8. EIS-0526: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0526: EPA Notice of Availability of the Draft Environmental Impact Statement Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana EPA issued a notice of availability for a Draft EIS, prepared by the U.S. Army Corps of Engineers and the Bureau of Reclamation as joint lead agencies, for the Lower Yellowstone Intake Diversion Dam Fish Passage Project. DOE's

  9. EIS-0526: USACE and BOR Notice of Availability of the Draft Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy USACE and BOR Notice of Availability of the Draft Environmental Impact Statement EIS-0526: USACE and BOR Notice of Availability of the Draft Environmental Impact Statement Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana The U.S. Army Corps of Engineers and the Bureau of Reclamation jointly issued a notice of availability for a Draft EIS for the Lower Yellowstone Intake Diversion Dam Fish Passage Project. DOE's

  10. The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  11. Draft 2014 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan (4.52 MB) More Documents & Publications 2011 Annual Plan 2013 Annual Plan Sec. 999 Annual Plan 2012

  12. Biomass 2014 Draft Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Biomass 2014 Draft Agenda All topics and times are tentative and subject to change. Page | 1 BIOMASS 2014: Growing the Future Bioeconomy July 29-30, 2014, Washington Convention ...

  13. EIS-0481: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programmatic Environmental Impact Statement EIS-0481: Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic...

  14. Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-06-20

    BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

  15. EIS-0444: Texas Clean Energy Project (TCEP), Ector County, Texas

    Broader source: Energy.gov [DOE]

    DOE has prepared a draft Supplement Analysis to the Texas Clean Energy Project due to changes made to the project after the issuance of the record of decision. See the draft SA for more detailed information on these changes.

  16. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project; Kalispell and Polson, Montana

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. The proposed action is to replace wood-pole structures and other line components and improve access roads.

  17. Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Solicitation ...

  18. Questions, Comments, and Answers for Draft Request for Proposal Documents |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Questions, Comments, and Answers for Draft Request for Proposal Documents DE-SOL-0008470 Responses to Draft Solicitation (Updated May 23, 2016) Related Topics apm contract Sandia National Laboratories snl Related News NNSA Statement Regarding Nevada National Security Site Management & Operating Contract NNSA Awards Nevada National Security Site Management & Operating Contract to NVS3T Los Alamos National Laboratory Steam Plant Project

  19. Barriers to CHP with Renewable Portfolio Standards, Draft White Paper,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    September 2007 | Department of Energy CHP with Renewable Portfolio Standards, Draft White Paper, September 2007 Barriers to CHP with Renewable Portfolio Standards, Draft White Paper, September 2007 The recent development of state renewable portfolio standards (RPS) has helped spur the growth of renewable energy projects, including solar, wind, and biomass power. This report aims to determine the barriers to CHP that exist within state RPS programs, and suggest ways to minimize or remove such

  20. EA-2004: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-2004: Draft Environmental Assessment The Seneca Nation Wind Turbine Project, Cattaraugus Territory, Erie County, New York The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to the Seneca Nation of Indians, to design, permit, and construct up to a 2.0-megawatt wind turbine on Tribal common lands in the Cattaraugus Territory, New York. The turbine would be located near Lucky Lane and Gil Lay Arena. An Environmental

  1. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  2. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryLane-Wendson. PUBLIC COMMENT OPPORTUNITIES There are no ...

  3. EIS-0505: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  4. EIS-0505: Supplemental Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

  5. EIS-0391: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0391: Draft Environmental Impact Statement Tank ... EIS-0391: Draft Environmental Impact Statement, Summary (3.65 MB) EIS-0391: Draft ...

  6. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

  7. EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western’s transmission system.

  8. EIS-0332: McNary-John Day Transmission Line Project, OR

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

  9. EA-1906: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

  10. EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental...

    Energy Savers [EERE]

    For more information on this project, see the project webpage: http:energy.govnode299815. Download Document PDF icon EIS-0283-S2: EPA Notice of Availability of the Draft...

  11. Draft Agenda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Agenda Draft Agenda Draft agenda for the September 20-21, 2007 National Laboratory Fuel Cell Deployment Meeting. Draft Agenda (24.98 KB) More Documents & Publications Fuel Cell Meeting Agenda: Matching Federal Government Needs with Energy Efficient Fuel Cells Water Power Program Peer Review Meeting Agenda Hydrogen, Hydrocarbons, and Bioproduct Precursors from Wastewaters Workshop: Agenda and Objectives

  12. EIS-0387: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy Draft Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Draft Environmental Impact Statement Y-12 National Security Complex Project, Oak Ridge, Tennessee EIS-0387-DEIS-EPANOA-2009.pdf (134.82 KB) More Documents & Publications EIS-0391: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0236-S4: EPA Notice of Availability of the

  13. The lick AGN monitoring project 2011: Fe II reverberation from the outer broad-line region

    SciTech Connect (OSTI)

    Barth, Aaron J.; Cooper, Michael C.; Pancoast, Anna; Treu, Tommaso; Bennert, Vardha N.; Brewer, Brendon J.; Canalizo, Gabriela; Filippenko, Alexei V.; Li, Weidong; Cenko, S. Bradley; Clubb, Kelsey I.; Gates, Elinor L.; Greene, Jenny E.; Malkan, Matthew A.; Sand, David J.; Stern, Daniel; Assef, Roberto J.; Woo, Jong-Hak; Bae, Hyun-Jin; Buehler, Tabitha; and others

    2013-06-01

    The prominent broad Fe II emission blends in the spectra of active galactic nuclei have been shown to vary in response to continuum variations, but past attempts to measure the reverberation lag time of the optical Fe II lines have met with only limited success. Here we report the detection of Fe II reverberation in two Seyfert 1 galaxies, NGC 4593 and Mrk 1511, based on data from a program carried out at Lick Observatory in Spring 2011. Light curves for emission lines including H? and Fe II were measured by applying a fitting routine to decompose the spectra into several continuum and emission-line components, and we use cross-correlation techniques to determine the reverberation lags of the emission lines relative to V-band light curves. In both cases, the measured lag (?{sub cen}) of Fe II is longer than that of H?, although the inferred lags are somewhat sensitive to the choice of Fe II template used in the fit. For spectral decompositions done using the Fe II template of Vron-Cetty et al., we find ?{sub cen}(Fe II)/?{sub cen}(H?) = 1.9 0.6 in NGC 4593 and 1.5 0.3 in Mrk 1511. The detection of highly correlated variations between Fe II and continuum emission demonstrates that the Fe II emission in these galaxies originates in photoionized gas, located predominantly in the outer portion of the broad-line region.

  14. EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

  15. EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of the Interior’s Bureau of Indian Affairs considered preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency. This project has been canceled.

  16. Project resumes: biological effects from electric fields associated with high-voltage transmission lines

    SciTech Connect (OSTI)

    1980-01-01

    Abstracts of research projects are presented in the following areas: measurements and special facilities; cellular and subcellular studies; physiology; behavior; environmental effects; modeling, scaling and dosimetry; and high voltage direct current. (ACR)

  17. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  18. EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

  19. EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

  20. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  1. EIS-0477: Notice of Availability of Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement (EIS) for the San Juan Basin Energy Connect Project (Project) and by this notice is announcing the opening of the comment period.

  2. DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential environmental impacts from its proposed action of granting a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new electric transmission line across the U.S.- Canada border in northeastern New York.

  3. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado.

  4. 20160307_DraftPEA

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment April 2016 DOE/EA-2006 BONNEVILLE POWER ADMINISTRATION DOE/BP-2006 * April 2016 Columbia Estuary Ecosystem Restoration Program Page i Table of Contents Chapter 1 Purpose of and Need for Action ................................................................................................. 1 1.1 Introduction ................................................................................................................................................... 1 1.2 Need

  5. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1982-01-01

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  6. EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

  7. Trestle Bay Restoration Project Draft Feasibility Study and Draft

    Broader source: Energy.gov (indexed) [DOE]

    Local Operating Procedures for Endangered Species to Administer Stream Restoration and Fish Passage Improvement Actions Authorized or Carried Out by the U.S. Army Corps of...

  8. Property:Draft(m) | Open Energy Information

    Open Energy Info (EERE)

    Draft(m) Jump to: navigation, search Property Name Draft(m) Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:Draft(m)&oldid623735" Feedback...

  9. The Spallation Neutron Source (SNS) Project | Department of Energy

    Office of Environmental Management (EM)

    The Spallation Neutron Source (SNS) Project The Spallation Neutron Source (SNS) Project SNS03.31.10.pdf More Documents & Publications EIS-0247: Draft Environmental Impact...

  10. Lower Yellowstone Intake Diversion Dam Fish Passage Project,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix E ... Lower Yellowstone Intake Diversion Dam Fish Passage Project Appendix E Monitoring and ...

  11. Lower Yellowstone Intake Diversion Dam Fish Passage Project,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix F Correspondence Lower Yellowstone Intake Diversion Dam Correspondence Fish Passage Project ...

  12. Microsoft Word - Renewable_Energy_Efficient_Energy_Projects_Loan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Provide drafts or executed copies of all material supply contracts for the Project; c) Provide the Project's forecast for sales capacity and feedstock (availability and costs); d) ...

  13. EIS-0403: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM...

  14. Draft Sample Collection Instrument | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Sample Collection Instrument Draft Sample Collection Instrument Davis-Bacon Semi-annual Labor Compliance Report OMB Control Number 1910-New PDF icon dbacollectioninstrument...

  15. EIS-0386: Draft Programmatic Environmental Impact Statement ...

    Office of Environmental Management (EM)

    Draft Programmatic Environmental Impact Statement EIS-0386: Draft Programmatic Environmental Impact ... would continue under current agency procedures for granting rights-of-way. ...

  16. Draft Tank Closure & Waste Management EIS - Summary

    Office of Environmental Management (EM)

    Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford ... (Ecology) Title: Draft Tank Closure and Waste Management Environmental Impact Statement ...

  17. Draft HAB Advice on Integrated Safety Management ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Committee Draft Advice -Integrated Safety Management v.3 - Korenko, Smith Page 13 Draft ... Safety Management v.3 - Korenko, Smith Page 23 employees, and actively listening ...

  18. Attachment 2: Draft Settlement Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    made by the Parties in all prior discussions, negotiations and agreements, whether oral or written, relating to the subject matter of this Agreement. 11. DRAFTING OF THE...

  19. EIS-0315: Caithness Big Sandy Project, Wikieup, AZ

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to approve Big Sandy Energy to interconnect a proposed 720-MW generating facility near Wikieup, Ariz., with the Mead-Phoenix Project 500-kV transmission line. The powerplant plan includes a proposed high-pressure natural gas pipeline, permanent access road and water pipelines that would cross BLM-administered land. Because the project could 'significantly affect the quality of the human environment,' studies must be done to identify environmental effects. WAPA is partnering with the Bureau of Land Management in Kingman on this project. BLM and Western have delayed issuing the Supplemental Draft EIS at the request of the applicant, Caithness Energy."

  20. Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1990-07-01

    The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

  1. Conversion and correction factors for historical measurements of Iodine-131 in Hanford-area vegetation, 1945--1947: Draft. Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Mart, E.I.; Denham, D.H.; Thiede, M.E.

    1993-05-01

    This report is a result of the Hanford Environmental Dose Reconstruction (HEDR) Project whose goal is to estimate the radiation dose that individuals could have received from emissions since 1944 at the US Department of Energy`s (DOE) Hanford Site near Richland, Washington. The report describes in detail the reconstructed conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation which was collected from the beginning of October 1945 through the end of December 1947.

  2. EIS-0422: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40–Mile-Long 500-kilovolt (kV) Transmission Line

  3. Searchlight Wind Energy Project FEIS Appendix A

    Office of Environmental Management (EM)

    2: Notice of Availability and Publications SEARCHLIGHT WIND ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT PUBLIC MEETING ANNOUNCEMENT The Bureau of Land Management (BLM) is...

  4. Energy Department Releases Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas Pollution

    Broader source: Energy.gov [DOE]

    As part of President Obama’s Climate Action Plan, DOE announced today a draft loan guarantee solicitation for innovative and advanced fossil energy projects and facilities that substantially reduce greenhouse gas and other air pollution.

  5. EIS-0473: DOE Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of a Draft Environmental Impact Statement EIS-0473: DOE Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX DOE announces the availability of the Draft Environmental Impact Statement for the W.A. Parish Post-Combustion Carbon Dioxide (CO2) Capture and Sequestration Project (DOE/EIS-0473D) for public review and comment, as well as the

  6. DOE Office of Indian Energy Solar RFP Template (Draft) | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy DOE Office of Indian Energy Solar RFP Template (Draft) DOE Office of Indian Energy Solar RFP Template (Draft) This document provides Tribes with a customizable request for proposals template for tribal solar photovoltaic systems, including roof-mounted, ground-mounted, and carport utility-interactive systems. The template contains information on project description, requirements, and submissions. Users can modify the template to suit their specific needs and projects. Source: DOE

  7. Draft Request for Proposal Documents | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Draft Request for Proposal Documents Instructions for DRAFT SNL Solicitation DE-SOL-0008470 Documents DRAFT Section B DE-SOL-0008470 DRAFT Section L DE-SOL-0008470 Instructions DRAFT Section M DE-SOL-0008470 Evaluation Factors DRAFT DE-SOL-0008470 Appendix A SNL Statement of Work DRAFT Section L Attachment E - Past Performance Information Form DRAFT Section L Attachment F - Past Performance Questionnaire DRAFT Section L Attachment G - Management Team Cost Sheet

  8. Draft Innovative Exploration Technologies Needs Assessment

    Broader source: Energy.gov [DOE]

    A draft needs assessment for the Geothermal Technologies Programs Innovative Exploration Technologies Subprogram.

  9. EIS-0288: Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Draft Environmental Impact Statement (EIS) for the Production of Tritium in a Commercial Light Water Reactor

  10. EIS-0222: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan

  11. Recommendations: Draft 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Annual Plan Recommendations: Draft 2012 Annual Plan Recommendations: Draft Section 999 2012 Annual Plan Section 999 - Recommendations: Draft 2012 Annual Plan (341.3

  12. Recommendations: Draft 2013 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Plan Recommendations: Draft 2013 Annual Plan URTAC - Recommendations on Draft 2013 Section 999 Annual Plan URTAC - Recommendations on Draft 2013 Annual Plan (457.55

  13. EIS-0496: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0496: Draft Environmental Impact Statement San ... and state lead agencies, issued a draft EISEnvironmental Impact Report that assesses ...

  14. EIS-0375: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0375: Draft Environmental Impact Statement ... Waste and GTCC-Like Waste (Draft GTCC EIS) to evaluate the potential environmental ...

  15. EIS-0453: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0453: Draft Environmental Impact Statement ... Laboratory DOE prepared this Draft EIS to evaluate the potential environmental ...

  16. EIS-0447: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0447: Draft Environmental Impact Statement DOE prepared this Draft EIS to evaluate the potential environmental impacts of a DOE proposal to ...

  17. EIS-0336: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0336: Draft Environmental Impact Statement Tucson ... to Santa Ana.FE has prepared this Draft EIS to address the environmental impacts of the ...

  18. EIS-0387: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Draft ... More Documents & Publications EIS-0391: EPA Notice of Availability of the Draft ...

  19. Microsoft Word - GJPPGPracticesDraft.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GJPPGPracticesDraft.doc Microsoft Word - GJPPGPracticesDraft.doc PDF icon Microsoft Word - GJPPGPracticesDraft.doc More Documents & Publications 1 DOE Purchase Card Policy Natural ...

  20. EA-1904: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the ...

  1. EA-1979: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1979: Draft Environmental Assessment Summit Wind Farm; Summit, South Dakota Western Area Power Administration (Western) issued a draft EA that ...

  2. EA-1984: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1984: Draft Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory, Idaho DOE has prepared a draft EA to...

  3. EIS-0008-S: Supplement, Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate the environmental impacts of construction of a steel double-circuit 345-kilovolt transmission line from Moore Substation near Littleton, New Hampshire, to Comerford Substation near Monroe, New Hampshire and a 345-kilovolt wood pole transmission line from Comerford Substation to Webster Substation near Franklin, New Hampshire, as part of the Dickey-Lincoln School Lakes Transmission Project. The Final SEIS consists entirely of Section 9 (Consultation and Coordination), which incorporates public and agency comments on the Draft SEIS and responses to those comments, as well as all necessary errata and addenda to the Draft SEIS. This SEIS is a supplement to DOE/EIS-008, Dickey-Lincoln School Lakes Transmission Project.

  4. Socioeconomic effects of DRAFT power marketing options of the Central Valley and Washoe Projects: 2005 regional economic impact analysis using IMPLAN

    SciTech Connect (OSTI)

    Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

    1996-04-01

    This report summarizes the methods and conclusions of an economic analysis of the distributional effects of alternative actions that Sierra Nevada could take with its new marketing plan. These alternatives are summarized in the agency`s Environmental Impact Statement (EIS), and this study directly supports the findings in the EIS. The study evaluates the potential economic impacts projected to occur across the northern and central California area currently serviced by Sierra Nevada`s customers. A standard input-output estimation approach was used to calculate impacts on regional output, labor income, and employment. The IMPLAN regional economic modeling system was used to develop regional models for the analysis. Individual regional models were developed for the overall area, the San Francisco Consolidated Metropolitan Statistical Area, the Sacramento Consolidated Metropolitan Statistical Area, the Redding Metropolitan Statistical Area, and the Bakersfield Metropolitan Statistical Area. The analysis relies on information about the effect of Sierra Nevada`s alternative actions on overall system power costs for the year 2005 developed by RW Beck and Associates (Beck-1996). This information is used as input to the 2005 benchmarked IMPLAN regional economic models. The resulting economic impact estimates are inextricably linked to this input information about changes in system power costs, and the estimates reported here are of similar relative magnitude to those estimates. The potential economic effects of Sierra Nevada`s actions are extremely small in relation to the size of the economies potentially affected, and, although they are calculable, they are not significant and often difficult to separate from random error present in the models.

  5. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  6. Groups of homeomorphisms of the line. Criteria for the existence of invariant and projectively invariant measures in terms of the commutator subgroup

    SciTech Connect (OSTI)

    Beklaryan, L A

    2014-12-31

    Existence criteria for invariant and projectively invariant measures are obtained for a group G of homeomorphisms of the line. These criteria are formulated in terms of the commutator subgroup [G,G]. For the special (but very important) case of groups of homeomorphisms of the line containing a freely acting element we obtain a criterion for the existence of a projectively invariant measure in the form of the absence of a special subgroup with two generators in which one of the generating elements is a freely acting element. Bibliography: 20 titles.

  7. Possible Draft HAB Comments for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    : Preliminary issue manager discussion draft; path forward TBD Possible Draft HAB Comments for Remedial Investigation/Feasibility Study and Proposed Plan for the 100-DR-1, 100-DR-2, 100- HR-1, 100-HR-2 and 100-HR-3 Operable Units, (DOE/RL-2010-95 and RL-2011-111, Draft A). * The Board supports the decision to proceed with remediation of the 100-D/H River Corridor areas, and is generally supportive of DOE's alternative analysis for the 100-D/H Areas. * Alternatives 2, 3 and 4 do not meet TPA

  8. Draft Meeting Summary Page 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 2, 2016 DRAFT MEETING SUMMARY HANFORD ADVISORY BOARD PUBLIC INVOLVEMENT AND COMMUNICATION COMMITTEE February 2, 2016 Richland, WA Topics in this Meeting Summary Opening ......................................................................................................................................................... 1 Tri-Party Agreement Public Involvement ..................................................................................................... 2 HAB Report Summary

  9. EA-1778: Draft Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE)

    [Draft] Environmental Assessment for the [Supplemental] Proposed Rule, 10 CFR Part 433 and 10 CFR Part 435, “Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal Buildings"

  10. Hanford Advisory Board Draft Letter

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft Letter Topic: Worker safety and communication restrictions Authors: Bob Suyama, Shelley Cimon, Susan Leckband, Jerry Peltier Originating Committee: Executive Issues Committee Version #1 10.14.15 Draft letter: worker safety and communication restrictions v.1 Since the inception of the Hanford Advisory Board (Board), one of the Board's primary values is the protection of worker health and safety at the Hanford Site. The Board continues to be concerned about the consequences of worker

  11. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.

  12. Lake Erie Connector Project Environmental Assessment Draft

    Energy Savers [EERE]

    ... Although there are several natural gas production areas ... Sewer and Wastewater Treatment The Erie City Sewer ... (PAHs) from the diesel exhaust of locomotives, and metals ...

  13. Lake Erie Connector Project Environmental Assessment Draft

    Broader source: Energy.gov (indexed) [DOE]

    ... to help support electric demand in Pennsylvania and more ... somewhat in the mid-1940s, but the species is now rare. ... all areas of exposed earth that are not otherwise ...

  14. Draft Environmental Assessment Sleeping Giant Hydropower Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ......... 5 Pumping Plant Building ......22 Preferred Alternative (Hydropower Plant and Electrical Distribution System) ...

  15. Microsoft Word - STO Comments on Clean Line Application under...

    Broader source: Energy.gov (indexed) [DOE]

    Clean Line Transmission Line Project ("Clean Line Project" or "Project"). ... "objective of integrating more renewable resources onto the grid," 1 However, after reviewing Section ...

  16. EIS-0503: EPA Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    VT. The transmission line would connect to the Vermont Electric Power Company substation in Cavendish, VT. For more information on this project, see the project page: http:...

  17. EIS-0503: DOE Notice of Availability of Draft Environmental Impact...

    Broader source: Energy.gov (indexed) [DOE]

    VT. The transmission line would connect to the Vermont Electric Power Company substation in Cavendish, VT. For more information on this project, see the project page: http:...

  18. THE LICK AGN MONITORING PROJECT 2011: DYNAMICAL MODELING OF THE BROAD-LINE REGION IN Mrk 50

    SciTech Connect (OSTI)

    Pancoast, Anna; Brewer, Brendon J.; Treu, Tommaso; Bennert, Vardha N.; Sand, David J.; Barth, Aaron J.; Cooper, Michael C.; Canalizo, Gabriela; Filippenko, Alexei V.; Li, Weidong; Cenko, S. Bradley; Clubb, Kelsey I.; Gates, Elinor L.; Greene, Jenny E.; Malkan, Matthew A.; Stern, Daniel; Assef, Roberto J.; Woo, Jong-Hak; Bae, Hyun-Jin; Buehler, Tabitha; and others

    2012-07-20

    We present dynamical modeling of the broad-line region (BLR) in the Seyfert 1 galaxy Mrk 50 using reverberation mapping data taken as part of the Lick AGN Monitoring Project (LAMP) 2011. We model the reverberation mapping data directly, constraining the geometry and kinematics of the BLR, as well as deriving a black hole mass estimate that does not depend on a normalizing factor or virial coefficient. We find that the geometry of the BLR in Mrk 50 is a nearly face-on thick disk, with a mean radius of 9.6{sup +1.2}{sub -0.9} light days, a width of the BLR of 6.9{sup +1.2}{sub -1.1} light days, and a disk opening angle of 25 {+-} 10 deg above the plane. We also constrain the inclination angle to be 9{sup +7}{sub -5} deg, close to face-on. Finally, the black hole mass of Mrk 50 is inferred to be log{sub 10}(M{sub BH}/M{sub Sun }) = 7.57{sup +0.44}{sub -0.27}. By comparison to the virial black hole mass estimate from traditional reverberation mapping analysis, we find the normalizing constant (virial coefficient) to be log{sub 10} f = 0.78{sup +0.44}{sub -0.27}, consistent with the commonly adopted mean value of 0.74 based on aligning the M{sub BH}-{sigma}* relation for active galactic nuclei and quiescent galaxies. While our dynamical model includes the possibility of a net inflow or outflow in the BLR, we cannot distinguish between these two scenarios.

  19. EIS-0460: EPA Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 program. The FutureGen 2.0 program would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated

  20. EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement and Notice of Public Hearings | Department of Energy 50-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project NNSA, a semiautonomous agency within DOE, proposes to complete the

  1. EIS-0407: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas E9-22920.pdf (138.89 KB) More Documents & Publications EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental Impact

  2. EIS-0408: EPA Notice of Availability of a Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement | Department of Energy EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0408: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement Upper Great Plains Wind Energy Programmatic EIS EPA announces the availabilty of the Upper Great Plains Programmatic Wind Project Programmatic EIS, that is being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife

  3. EIS-0469: EPA Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Statement | Department of Energy 9: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0469: EPA Notice of Availability of a Draft Environmental Impact Statement Wilton IV Wind Energy Center; Burleigh County, North Dakota This EIS will evaluate the environmental impacts of interconnecting NextEra Energy Resources proposed Wilton IV Wind Energy Center Project, near Bismarck, North Dakota, to one of DOE's Western Area Power Administration's existing substations and to

  4. WY FONSI DRAFT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administration 1 Finding of No Significant Impact Wallooskee-Youngs Confluence Restoration Project Bonneville Power Administration DOE/EA-197 4 July 2015 Summary Bonneville Power Administration (BPA) announces its environmental findings for the Wallooskee-Youngs Confluence Restoration Project. The project involves funding Astoria Wetlands, LLC (Astoria Wetlands) to restore a tidal marsh in the Columbia River estuary to improve salmon and steelhead habitat. Implementing the project would restore

  5. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  6. Environmental impact report (draft)

    SciTech Connect (OSTI)

    Not Available

    1980-05-01

    The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

  7. EIS-0523: Draft Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Non-Contiguous United States

  8. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 230-kV transmission line in Washington State. BPA’s proposed action is to interconnect the proposed transmission line to an existing BPA substation.

  9. Recommendations: Draft Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan Recommendations: Draft Annual Plan Section 999 Annual Plan Recommendations on Draft 2014 Section 999 Annual Plan (409.54 KB) More Documents & Publications URTAC Meeting - December 18, 2013 Committee Report for December 18, 2013 Meeting Recommendations: Draft 2013 Annual Plan

  10. EIS-0315-S1: SEIS on Caithness Big Sandy Project

    Broader source: Energy.gov [DOE]

    In June 2001, the Bureau of Land Management (BLM) and Western Area Power Administration (Western) issued the Big Sandy Energy Project Draft Environmental Impact Statement (EIS) (BLM and Western 2001). After June 2001, Caithness Big Sandy, L.L.C. (Caithness), revised aspects of the Big Sandy Energy Project (Project) described as the Proposed Action in the Draft EIS.

  11. Merit draft fact sheet

    Office of Scientific and Technical Information (OSTI)

    ... Songgang Qiu , sqiu@infiniacorp.com Partner Organizations: Enertron Inc., International Copper Association PROJECT TITLE: Stirling Air Conditioner for Compact Cooling ORGANIZATION: ...

  12. Draft Environmental Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... does not have a projected annual or estimated demand. ... rock piles, etc.), glass, metal, ceramic, or other historic ... during excavation or other earth-moving or other ...

  13. Molten-Caustic-Leaching (Gravimelt) System Integration Project, Phase 2. Topical report for test circuit maintenance, refurbishment, modification, and off-line operation

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This is a report of the maintenance, refurbishment, modifications, and off-line circuit component testing of the integrated test circuit of the Molten-Caustic-Leaching (MCL or Gravimelt) process for the desulfurization and demineralization of coal. The project is sponsored by the Pittsburgh Energy Technology Center of the US Department of Energy under Contract No. DE-AC22-86-PC91257.

  14. WY Final EA DRAFT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    made throughout the EA: The overhead cable line located along OR 202 is owned by ... The sheet pile wall would extend along OR 202 for a total length of approximately 800 ...

  15. DRAFT 20 August 2008

    Office of Environmental Management (EM)

    risks with little long-term management, and that has proven effective under similar conditions". DOE Policy 455.1, "Use of Risk-Based End States" directs DOE line management...

  16. ONE NEVADA LINE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE PROJECT SUMMARY In February 2011, the Department of Energy issued a $343 million loan guarantee to finance the One Nevada Transmission Line (ON Line) project, a 235-mile, 500 kV AC transmission line capable of carrying 600 MW of power to the grid running

  17. Microsoft Word - AGS Draft EA_Draft Final

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Alternating Gradient Synchrotron Complex, Upgrades for Continued Operation DRAFT ENVIRONMENTAL ASSESSMENT FOR Alternating Gradient Synchrotron Complex, Upgrades for Continued Operation BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK BROOKHAVEN SITE OFFICE March 2016 DOE/EA-2010 i Table of Contents 1.0 INTRODUCTION...................................................................................... 1 2.0

  18. Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop

    SciTech Connect (OSTI)

    Galarowicz, James

    2014-01-06

    In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project teams work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories

  19. Recommendations: Draft 2010 Section 999 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10 Section 999 Annual Plan Recommendations: Draft 2010 Section 999 Annual Plan UDAC - Recommendations on Draft 2010 Section 999 Annual Plan (4.19 MB) More Documents & Publications Recommendations: Draft 2009 Section 999 Annual Plan Recommendations: Draft 2012 Annual Plan Recommendations: Draft 2013

  20. The Genomes OnLine Database (GOLD) v.5: a metadata management system based on a four level (meta)genome project classifications

    SciTech Connect (OSTI)

    Thomas, Alex D.; Stamatis, Dimitri; Bertsch, Jon; Isbandi, Michelle; Jansson, Jakob; Mallajosyula, Jyothi; Pagani, Ioanna; Lobos, Elizabeth A.; Kyrpides, Nikos C.; Reddy, Tatiparthi

    2014-10-29

    The Genomes OnLine Database (GOLD, http://www.genomesonline.org) is a comprehensive online resource to catalogue and monitor genetic studies worldwide. GOLD provides up-to-date status on complete and ongoing sequencing projects along with a broad array of curated metadata. Here we report version 5 (v.5) of the database. The newly designed database schema and web user interface supports several new features including the implementation of a four level (meta)genome project classification system and a simplified intuitive web interface to access reports and launch search tools. The database currently hosts information for about 19,200 studies, 56,000 Biosamples, 56,000 sequencing projects, and 39,400 analysis projects. More than just a catalogue of worldwide genome projects, GOLD is a manually curated, quality controlled metadata warehouse. The problems encountered in integrating disparate and varying quality data into GOLD are briefly highlighted. GOLD fully supports and follows the Genomic Standards Consortium (GSC) Minimum Information standards.

  1. Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)

    SciTech Connect (OSTI)

    Muons, Inc.

    2011-05-19

    This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the company's continued success and growth is directly related to our expertise in applying this program to interesting applications.

  2. DRAFT LM 2016-2025 Strategic Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT LM 2016-2025 Strategic Plan DRAFT LM 2016-2025 Strategic Plan File Draft LM 2016-2025 Strategic Plan More Documents & Publications 2011-2020 Strategic Plan The First Decade, ...

  3. Appendix A: Comments and Responses on the Draft Revised FONSI

    National Nuclear Security Administration (NNSA)

    Can you provide recent water quality results? The Draft Revised FONSI was drafted to ... The Draft Revised FONSI did not impact the plan for water quality testing at the site. ...

  4. NERI Final Project Report: On-Line Intelligent Self-Diagnostic Monitoring System for Next Generation Nuclear Power Plants

    SciTech Connect (OSTI)

    Bond, Leonard J.; Jarrell, Donald B.; Koehler, Theresa M.; Meador, Richard J.; Sisk, Daniel R.; Hatley, Darrel D.; Watkins, Kenneth S.; Chai, Jangbom; Kim, Wooshik

    2003-06-20

    This project provides a proof-of-principle technology demonstration for SDMS, where a distributed suite of sensors is integrated with active components and passive structures of types expected to be encountered in next generation nuclear power reactor and plant systems. The project employs state-of-the-art operational sensors, advanced stressor-based instrumentation, distributed computing, RF data network modules and signal processing to improve the monitoring and assessment of the power reactor system and gives data that is used to provide prognostics capabilities.

  5. OFFICIAL USE ONLY Pre-Decisional Draft OFFICIAL USE ONLY Pre-Decisional Draft

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OFFICIAL USE ONLY Pre-Decisional Draft OFFICIAL USE ONLY Pre-Decisional Draft SAFEGUARDS & SECURITY STRATEGY Safeguards & Security requirements are derived from the quantity and attractiveness of the material, as shown in Figures1 and 2. Figure 1 Nuclear Material Safeguards Categories OFFICIAL USE ONLY Pre-Decisional Draft OFFICIAL USE ONLY Pre-Decisional Draft Description/Form MaximumSNM concentration* (wt%) for MC&A and physical protection termination MaximumSNM concentration(wt%)

  6. EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration EIS so that WAPA could supplement it in support of WAPA’s National Environmental Policy Act requirements for a related project (see DOE/EIS-0116-S1).

  7. Waste Treatment Plant Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plant Project Waste Treatment Plant Project Presentation from the 2015 DOE National Cleanup Workshop by Peggy McCullough, Project Manager-WTP, Bechtel National. Waste Treatment Plant Project (669.27 KB) More Documents & Publications Waste Treatment Plant and Tank Farm Program Managing Large Capital Projects EIS-0391: Draft Environmental Impact Statement

  8. Transmission Business Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Transmission Business Line Non-Federal Financing of Transmission Projects - March 2004 Critical paths on the Northwest transmission grid are congested and the system is near or at...

  9. DRAFT-122107.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tunnel PLA 10-01-12 thru 09-30-17 Page 1 of 57 CONSTRUCTION TUNNEL AND TUNNEL-SHAFT PROJECT LABOR AGREEMENT FOR THE NEVADA NATIONAL SECURITY SITE (NNSS) between NATIONAL SECURITY TECHNOLOGIES LLC (NSTec) and LABORERS' INTERNATIONAL UNION OF NORTH AMERICA, LOCAL UNION NO. 872 October 1, 2012 through September 30, 2017 Tunnel PLA 10-01-12 thru 09-30-17 Page 2 of 57 TABLE OF CONTENTS 1. PREAMBLE

  10. Merit draft fact sheet

    Office of Scientific and Technical Information (OSTI)

    TEXT UPDATED: 2/15/2012 BEETIT PROJECT INFINIA HIGH-EFFICIENCY STIRLING AIR CONDITIONER CRITICAL NEED New and more efficient cooling methods are needed to reduce building energy consumption and environmental impact. Buildings currently account for 72% of the nation's electricity use and 40% of our CO2 emissions each year, 5% of which comes directly from air conditioning. The refrigerants typically used in air conditioners are greenhouse gases (GHG) that may contribute to global climate change.

  11. New Draft of Cybersecurity Risk Management Process (RMP) Guideline...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft of Cybersecurity Risk Management Process (RMP) Guideline Now Available for Public Comment (March 2012) New Draft of Cybersecurity Risk Management Process (RMP) Guideline Now ...

  12. The Department of Energy Releases Draft of Cybersecurity Risk...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Department of Energy Releases Draft of Cybersecurity Risk Management Process (RMP) Guideline for Public Comment (September 2011) The Department of Energy Releases Draft of ...

  13. Draft Site-Wide Environmental Impact Statement Nevada Summary...

    National Nuclear Security Administration (NNSA)

    Office of General Counsel National Environmental Policy Act (NEPA) NEPA Reading Room Draft Site-Wide Environmental Impact Statement Nevada Draft Site-Wide Environmental...

  14. Draft Chapter 4: Transmission Adequacy | Department of Energy

    Energy Savers [EERE]

    Draft Chapter 4: Transmission Adequacy Draft Chapter 4: Transmission Adequacy A robust interstate electric transmission network must be developed to enable our electricity future....

  15. ASHRAE draft regarding Smart Grid RFI: Addressing Policy and...

    Energy Savers [EERE]

    ASHRAE draft regarding Smart Grid RFI: Addressing Policy and Logistical Challenges ASHRAE draft regarding Smart Grid RFI: Addressing Policy and Logistical Challenges The American ...

  16. EA-1790: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of the Draft Environmental Assessment Heterogeneous Feed Biorefinery Pontotoc, MS The U.S. Department of Energy (DOE) has prepared a draft Environmental...

  17. EIS-0343: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0343: Draft Environmental Impact Statement COB Energy Facility COB Energy Facility, a subsidiary of Peoples Energy Resources Corporation...

  18. EIS-0165: DRAFT ENVIRONMENTAL IMPACT STATEMENT | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: DRAFT ENVIRONMENTAL IMPACT STATEMENT EIS-0165: DRAFT ENVIRONMENTAL IMPACT STATEMENT EIS-0165: Strategic Petroleum Reserve Alabama, Louisiana, Mississippi, and Texas ...

  19. EIS-0453: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Notice of Availability of Draft Environmental Impact Statement EIS-0453: DOE Notice of ... the Draft Environmental Impact Statement (EIS) for the Recapitalization of Infrastructure ...

  20. EA-1955: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1955: Draft Environmental Assessment Campbell County Wind Farm, Campbell County, South Dakota DOE's Western Area Power Administration (Western) ...

  1. EA-1870: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    70: Draft Environmental Assessment EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah The U.S. Department of Energy (DOE) prepared this...

  2. EIS-0319: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts...

  3. EA-1917: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces the availability of the Draft EA for the...

  4. DRAFT NEPA Guidance on Consideration of the Effects of Climate...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and Greenhouse Gas Emissions DRAFT NEPA Guidance on Consideration of the Effects of Climate Change and ...

  5. HAWAI'I CLEAN ENERGY DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT...

    Broader source: Energy.gov (indexed) [DOE]

    HAWAI'I CLEAN ENERGY DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT SUMMARY (DOEEIS-0459) APRIL 2014 COVER SHEET TITLE: Hawai'i Clean Energy Draft Programmatic Environmental...

  6. EIS-0323: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Impact Statement EIS-0323: Draft Environmental Impact Statement Sacramento Area Voltage Support This Draft EIS evaluates the potential environmental effects of physical...

  7. UNEP Handbook for Drafting Laws on Energy Efficiency and Renewable...

    Open Energy Info (EERE)

    Handbook for Drafting Laws on Energy Efficiency and Renewable Energy Resources Jump to: navigation, search Tool Summary LAUNCH TOOL Name: UNEP Handbook for Drafting Laws on Energy...

  8. DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 DOE EAC Electricity Adequacy Report. Transmission Chapter DRAFT- September 18, 2008 The purpose of...

  9. EIS-0440: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy ...

  10. EIS-0472: EPA Notice of Availability of a Draft Programmatic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement ...

  11. EIS-0469: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0469: EPA Notice of Availability of a Draft Environmental Impact Statement Wilton IV Wind Energy Center; ...

  12. EIS-0481: EPA Notice of Availability of Draft Programmatic Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement Engineered ...

  13. Federal Register Notice for Draft Addendum to Environmental Review...

    Energy Savers [EERE]

    Notice for Draft Addendum to Environmental Review Documents Concerning Exports of Natural Gas from the United States Federal Register Notice for Draft Addendum to...

  14. EA-1941: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1941: Draft Environmental Assessment Boyer-Tillamook ... The preliminary EA also considers a no action alternative where the improvements would not ...

  15. EA-1947: Draft Revised Finding of No Significant Impact | Department...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1947: Draft Revised Finding of No Significant Impact EA-1947: Draft Revised Finding of No Significant Impact Transfer of the Kansas City Plant, Kansas City, Missouri The National ...

  16. Draft Specifications for Application of UNFC-2009 to Renewable...

    Open Energy Info (EERE)

    Draft Specifications for Application of UNFC-2009 to Renewable Energy Resources Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Draft Specifications for...

  17. EA-1934: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1934: Draft Environmental Assessment Expansion of Active Borrow Areas, Hanford Site, Richland, Washington This EA will evaluate the potential ...

  18. EA-1973: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3: Draft Environmental Assessment EA-1973: Draft Environmental Assessment Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Bonneville Power Administration issued ...

  19. EA-1728: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1728: Draft Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington For more information, contact: Mr....

  20. EA-1889: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) The Department of the...

  1. Energy Department Releases Draft Updated Best Practices for Residentia...

    Energy Savers [EERE]

    Releases Draft Updated Best Practices for Residential PACE Financing Programs Energy Department Releases Draft Updated Best Practices for Residential PACE Financing Programs July ...

  2. Revised Draft Guidance on Consideration of Greenhouse Gas Emissions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Guidance on Consideration of Greenhouse Gas Emissions and Climate Change in NEPA Reviews Revised Draft Guidance on Consideration of Greenhouse Gas Emissions and Climate ...

  3. EIS-0485: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0485: Draft Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power ...

  4. EIS-0376: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Impact Statement EIS-0376: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  5. EIS-0306: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6: Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  6. EIS-0082-S2: Draft Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    82-S2: Draft Environmental Impact Statement EIS-0082-S2: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  7. EIS-0271: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  8. EIS-0525: EPA Notice of Availability of Draft Programmatic Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0525: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement Nationwide ...

  9. EIS-0309: Draft Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Site-Wide Environmental Impact Statement EIS-0309: Draft Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA ...

  10. EA-1952: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1952: Draft Environmental Assessment Lane-Wendson No. 1 ... EA-1952: Final Environmental Assessment EA-1952: Finding of No Significant Impact

  11. EA-1922: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Notice of Availability of a Draft Environmental Assessment EA-1922: Notice of Availability of a ... EA-1922: Draft Environmental Assessment EA-1922: Finding of No Significant Impact

  12. EA-1903: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1903: Draft Environmental Assessment Kansas State ... EA-1903: Final Environmental Assessment EA-1903: Finding of No Significant Impact

  13. EA-1855: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission...

  14. EA-1932: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft Environmental Assessment EA-1932: Draft Environmental Assessment Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana This EA will evaluate the potential...

  15. EIS-0312: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

  16. DOE Draft Standard, Development and Use of Probabilistic Risk...

    Office of Environmental Management (EM)

    Draft Standard, Development and Use of Probabilistic Risk Assessments in Department of Energy Nuclear Safety Applications, 1210 DOE Draft Standard, Development and Use of ...

  17. EIS-0525: Department of Commerce Notice of Availability of Draft...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0525: Department of Commerce Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0525: Department of Commerce Notice of Availability of Draft ...

  18. EIS-0279: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    : Draft Environmental Impact Statement EIS-0279: Draft Environmental Impact Statement The ... website due to the potential security sensitivity of some information in these documents. ...

  19. National Electric Transmission Congestion Study - Draft for Public...

    Office of Environmental Management (EM)

    - Draft for Public Comment August 2014 National Electric Transmission Congestion Study - Draft for Public Comment August 2014 On August 19, 2014, the Department issued a Federal...

  20. Microsoft Word - Draft Comprehensive Evaluation News Release...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    208-378-5101 Draft report from Federal agencies shows gains for Columbia River Basin fish Portland, Ore. - Federal agencies and their partners outlined today five years of...

  1. Energy Transport Corridor Draft Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    is available for review and downloading at the agencies' Information Center. Review copies of the Draft PEIS are also available at libraries and agency regional and field offices. ...

  2. Buildings Interoperability Landscape - Draft | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE is therefore sponsoring an effort to advance interoperability for the integration of intelligent buildings equipment and automation systems. As part of that effort, this draft ...

  3. EIS-0250: Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain (July 1999)

  4. DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report: Revision 2 DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee Report: ... More Documents & Publications Battery Pack Requirements and Targets Validation FY 2009 ...

  5. DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee...

    Office of Environmental Management (EM)

    Report DRAFT "Energy Advisory Committee" - Energy Storage Subcommittee Report Energy storage ... More Documents & Publications Value of a Smart Grid System Battery Pack Requirements ...

  6. Draft Needs Assessment for Innovative Exploration Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    advances for the subprogram to pursue. Input received will be used to guide the strategy for leveraging resources to advance geothermal exploration tools. The Draft...

  7. Draft Powerpoint: Toward Energy Efficient Municipalities, LLC...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Powerpoint: Toward Energy Efficient Municipalities, LLC comment Draft Powerpoint: Toward Energy Efficient Municipalities, LLC comment Green Grid Gateway @ North Coast Oregon. ...

  8. PLAINS & EASTERN CLEAN LINE TRANSMISSION LINE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 1222 of the Energy Policy Act 2005 » PLAINS & EASTERN CLEAN LINE TRANSMISSION LINE PLAINS & EASTERN CLEAN LINE TRANSMISSION LINE On March 25, 2016, U.S. Secretary of Energy Dr. Ernest Moniz announced that the Department of Energy (DOE) will participate in the development of the Plains & Eastern Clean Line project (Project), a major clean energy infrastructure project. Through section 1222 of the Energy Policy Act of 2005, Congress authorized DOE to promote electric

  9. Plains & Eastern Clean Line Transmission Line - Part 2 Application |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Transmission Line - Part 2 Application Plains & Eastern Clean Line Transmission Line - Part 2 Application In addition to conducting a NEPA review of the proposed Plains & Eastern Clean Line Transmission Line project, DOE will also conduct due diligence on non-NEPA factors such as the project's technical and financial feasibility and whether the project is in the public interest. DOE will conduct a thorough review that includes making all required statutory

  10. EIS-0400: EPA Notice of Availability of a Draft Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Grandby Pumping Plant Switchyard Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

  11. DOE Releases Draft Request for Proposal for Los Alamos Legacy Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract | Department of Energy for Los Alamos Legacy Cleanup Contract DOE Releases Draft Request for Proposal for Los Alamos Legacy Cleanup Contract May 26, 2016 - 4:00pm Addthis Media Contact Lynnette Chafin, 513-246-0461 Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) for the Los Alamos Legacy Cleanup Contract (LLCC) acquisition. A contract that primarily includes cost-plus-award-fee contract line items for the purpose of continuing the

  12. EIS-0474: Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    potential land use plan amendments. The project would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, ...

  13. EIS-0474: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management ... existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to ...

  14. EIS-0499: DOE Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    Great Northern Transmission Line Project, Minnesota The U.S. Department of Energy (DOE) ... to grant a Presidential permit to Minnesota Power to construct, operate, maintain, ...

  15. EA-1617: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Basin-Lovell Transmission Line Rebuild Project Western Area Power Administration, Rocky Mountain Customer Service Region (Western) proposes to rebuild the Lovell-Yellowtail...

  16. EIS-0344: Draft Envrionmental Impact Statement | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed...

  17. Proposed residential building standards: draft environmental impact report

    SciTech Connect (OSTI)

    Not Available

    1981-03-01

    The Warren-Alquist Act of 1974 requires the California Energy Commission to adopt and periodically update energy-conservation standards for new residential buildings. The Act also requires the CEC to adopt performance standards for new buildings. With increased energy costs, the CEC staff proposed to update the current energy-conservation standards and they are a hybrid of performance and prescriptive requirements. The proposed standards do not cover hotels, motels, or buildings over 3 stories high. The purpose of an environmental impact report (EIR) is to provide public agencies and the public in general with detailed information about the effects a proposed project is likely to have on the environment, to list ways in which the significant effects of such a project might be minimized, and to indicate alternatives to the project. The contents of this Draft EIR includes: a project description; a description of the environmental setting, impacts, and mitigation measures; a discussion of alternatives; and an indication of growth-inducing impacts. The Draft EIR discusses both environmental and socio-economic impacts of the proposed standards compared to both the current standards and the pre-1975 practices. (MCW)

  18. Microsoft Word - draft announcement_Final

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Southwestern Power Administration One West Third Street Tulsa, Oklahoma 74103-3502 March 25, 2016 Dear Customers: Building on the U.S. Department of Energy's (DOE) ongoing efforts to modernize the grid and accelerate the deployment of renewable energy, Secretary of Energy Ernest Moniz announced today that DOE will participate in the development of the Plains & Eastern Clean Line Project (Project). Concurrent with the Secretary's announcement, DOE will publish on its website the executed

  19. Draft Multi-Year Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energys Building Technologies Office (BTO) has released its draft Multi-Year Program Plan (MYPP) for public comment. The draft MYPP provides a broad overview of buildings energy use and efficiency opportunities, and the strategies and goals of BTO to substantially accelerate the rate of efficiency improvements in both new and existing residential and commercial buildings.

  20. Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000

    SciTech Connect (OSTI)

    1995-03-03

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

  1. EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  2. Recommendations: Draft 2007 Section 999 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Section 999 Annual Plan Recommendations: Draft 2007 Section 999 Annual Plan UDAC - Recommendations on Draft 2007 Section 999 Annual Plan (157.88 KB) More Documents & Publications Recommendations: Draft 2012 Annual Plan Recommendations: Draft 2008 Section 999 Annual Plan UDAC Meeting - July 2007

  3. Recommendations: Draft 2009 Section 999 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    09 Section 999 Annual Plan Recommendations: Draft 2009 Section 999 Annual Plan UDAC Recommendations on Draft 2009 Section 999 Annual Plan (3.77 MB) More Documents & Publications Recommendations: Draft 2010 Section 999 Annual Plan Recommendations: Draft 2012 Annual Plan Recommendations: 2009

  4. Recommendations: Draft 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2012 Annual Plan Recommendations: Draft 2012 Annual Plan UDAC - Recommendations on Draft 2012 Section 999 Annual Plan UDAC Recommendations on Draft 2012 Section 999 Annual Plan (541.53 KB) More Documents & Publications Recommendations: Draft 2011 Section 999 Annual Plan Minutes from December 16, 2013 UDAC Meeting UDAC Next Steps

  5. EIS-0424: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Draft Environmental Impact Statement EIS-0424: Draft Environmental Impact Statement Klickitat Hatchery Complex Program Download Document EIS-0424: Draft Environmental Impact Statement (11.34 MB) More Documents & Publications EIS-0169-SA-03: Supplement Analysis EIS-0425: Draft Environmental Impact Statement EIS-0425

  6. Bradys EGS Project | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bradys EGS Project Bradys EGS Project Bradys EGS Project presentation at the April 2013 peer review meeting held in Denver, Colorado. ormat_brady_egs_peer2013.pdf (933.35 KB) More Documents & Publications Bradys EGS Project EA-1944: Final Environmental Assessment EA-1944: Draft Environmental Assessment

  7. EA-2006: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Columbia Estuary Ecosystem Restoration Program Bonneville Power Administration, with the U.S. Army Corps of Engineers as a cooperating agency, issued a draft programmatic EA for actions recommended by the Northwest Power and Conservation Council to help restore ecological structure, function, and biodiversity within the Columbia River estuary. Activities under this program could include full reconnection of tidal influence through breaching dikes and levees; partial reconnection of tidal influence through culverts, bridges, and tidegates; enhancement of the quantity and quality of tidal channels; removal of invasive species; and restoration of riparian habitat conditions, such as planting native vegetation.

  8. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...

    Office of Environmental Management (EM)

    Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft...

  9. EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...

    Energy Savers [EERE]

    Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft...

  10. EA-1951: Draft Environmental Assessment

    Broader source: Energy.gov [DOE]

    Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line; Benton and Yakima Counties, Washington

  11. Work Group Telecom (Draft Charters) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Telecom (Draft Charters) Work Group Telecom (Draft Charters) Meeting Date: September 8, 2011 Documents Available for Download Meeting Agenda (30.01 KB) Meeting Summary/Actions/Participants (72.36 KB) Draft Proposed Charter Template (52.16 KB) Draft Work Group Matrix (60.18 KB) Draft Work Group Guidance (47.24 KB) More Documents & Publications Focus Group Meeting (Activities Status

  12. BTO Seeks Comments on Draft Building Energy Modeling Roadmap | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Seeks Comments on Draft Building Energy Modeling Roadmap BTO Seeks Comments on Draft Building Energy Modeling Roadmap The Department of Energy's Building Technologies Office (BTO) seeks input from stakeholders on a draft Building Energy Modeling Roadmap. The draft Roadmap provides background and context, then outlines steps that BTO's contractor recommends to help increase the use of BEM tools for the design and operation of energy-efficient buildings. The draft Roadmap is based in

  13. EIS-0396: DOE Notice of Availability of the Draft Programmatic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Impact Statement | Department of Energy DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement EIS-0396: DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The Department of Energy (DOE) announces the availability of the Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (Draft GNEP PEIS, DOE/EIS-0396). Notice of Availability of Draft Global Nuclear

  14. EIS-0521: Draft Environmental Impact Statement | Department of Energy

    Energy Savers [EERE]

    Draft Environmental Impact Statement EIS-0521: Draft Environmental Impact Statement Gunnison Sage-Grouse Rangewide Draft Resource Management Plan Amendment and Draft Environmental Impact Statement Bureau of Land Management issued a Draft EIS that analyzes the potential environmental impacts of proposed Resource Management Plan amendments that would incorporate conservation measures for the Gunnison Sage-Grouse and its habitat on public land within the range of the species. Western Area Power

  15. EIS-0521: EPA Notice of Availability of Draft Environmental Impact

    Energy Savers [EERE]

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0521: EPA Notice of Availability of Draft Environmental Impact Statement Gunnison Sage-Grouse Rangewide Draft Resource Management Plan Amendment and Draft Environmental Impact Statement EPA announced the availability of a Bureau of Land Management Draft EIS that analyzes the potential environmental impacts of proposed Resource Management Plan amendments that would incorporate conservation

  16. Business Plan in Brief : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

  17. EIS-0508: Downeast LNG Import-Export Project, Washington County, Maine |

    Office of Environmental Management (EM)

    Department of Energy Availability of Draft Environmental Impact Statement EIS-0487: Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand an existing LNG import terminal and

  18. Microsoft Word - Conergy DRAFT EA 1876 7.20.2011.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    76D 1 Pennsylvania State Energy Program's Conergy Navy Yard Solar Project Philadelphia, Philadelphia County, Pennsylvania , DRAFT ENVIRONMENTAL ASSESSMENT DOE/EA-1876D 2 ENVIRONMENTAL ASSESSMENT For The PENNSYLVANIA STATE ENERGY PROGRAM'S CONERGY NAVY YARD SOLAR PROJECT PHILADELPHIA, PENNSYLVANIA U.S. Department of Energy National Energy Technology Laboratory TABLE OF CONTENTS CONTENTS 1.0 SUMMARY 5 1.1 INTRODUCTION AND BACKGROUND 5 1.2 PURPOSE AND NEED 7 1.3 SCOPE OF THIS ENVIRONMENTAL

  19. DRAFT/PRELIMINARY MEETING AGENDA

    Office of Environmental Management (EM)

    Session One - Update of EM Activities New York Room EM Waste Disposition - Christine Gelles, Director, Disposal Operations SNF Transfer Project - Scott DeClue, Federal Project...

  20. DOE O XXX.X DRAFT XX-XX-XX

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE O XXX.X DRAFT XX-XX-XX 4 DOE O XXX.X DRAFT XX-XX-XX DOE O XXX.X 3 DRAFT XX-XX-XX DOE O XXX.X Appendix A DRAFT XX-XX-XX A- 1 (and A-2) DOE O XXX.X Attachment 1 DRAFT XX-XX-XX Page 1 (and Page 2) Appendix E DOE O 251.1C E- 6 1-15-09 DOE O XXX.X Attachment 2 DRAFT XX-XX-XX Page 1 (and Page 2) draftDOE O XXX.XdraftDOE O XXX.Xu.s. Department of EnergyORDER draft DOE O XXX.X draft DOE O XXX.X Washington, DC Approved: XX-XX-XXXX SUBJECT: title PURPOSE. (Define the program or subject matter and its