1

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

2

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

3

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

4

Draft Advanced Nuclear Energy Projects Solicitation | Department...  

Broader source: Energy.gov (indexed) [DOE]

Draft Advanced Nuclear Energy Projects Solicitation Draft Advanced Nuclear Energy Projects Solicitation INFORMATIONAL MATERIALS DRAFT ADVANCED NUCLEAR ENERGY PROJECTS SOLICITATION...

5

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

6

Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242- Dec. 17, 2014  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS0486; Draft EIS) for a 90-day public comment period. DOE also announces 15 public hearings to receive comments on the Draft EIS. In addition, DOE invites comments on the National Historic Preservation Act Section 106 process and any potential adverse impacts to historic properties from the proposed Project.

7

Draft Advanced Nuclear Energy Projects Solicitation | Department...  

Broader source: Energy.gov (indexed) [DOE]

Projects Solicitation Draft Advanced Nuclear Energy Projects Solicitation Federal loan guarantee solicitation announcement -- Advanced Nuclear Energy Projects. Draft Advanced...

8

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

9

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

10

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

11

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

12

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

13

Draft Renewable Energy and Efficient Energy Projects Solicitation...  

Broader source: Energy.gov (indexed) [DOE]

Draft Renewable Energy and Efficient Energy Projects Solicitation Fact Sheet Draft Renewable Energy and Efficient Energy Projects Solicitation Fact Sheet Draft: Renewable Energy...

14

Energia Sierra Juarez U.S. Transmission Line Draft EIS  

Broader source: Energy.gov (indexed) [DOE]

Energia Sierra Juarez U.S. Transmission Line Project Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement Summary August 2010 U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington, DC 20585 Cooperating Agency - County of San Diego San Diego, CA DOE/EIS-0414 Department of Energy Washington, DC 20585 August 2010 Dear Sir/Madam: Enclosed for your review and comment is the Energia Sierra Juarez U.S. Transmission Line Project Draft Environmental Impact Statement (DOE/EIS-0414), prepared by the Department of Energy (DOE) pursuant to the National Environmental Policy Act of 1969 (NEPA) and its implementing regulations. The County of San Diego, California, is a cooperating agency in the preparation of this Draft EIS.

15

CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT  

Broader source: Energy.gov (indexed) [DOE]

CAMERON LIQUEFACTION PROJECT CAMERON LIQUEFACTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT TABLE OF CONTENTS EXECUTIVE SUMMARY .................................................................................................... ES-1 PROPOSED ACTION ............................................................................................................... ES-1 PUBLIC INVOLVEMENT ....................................................................................................... ES-3 PROJECT IMPACTS ................................................................................................................ ES-3 ALTERNATIVES CONSIDERED ........................................................................................... ES-7 CONCLUSIONS ....................................................................................................................... ES-8

16

Flatiron-Erie 115kV transmission line project, Larimer, Weld and Boulder Counties, Colorado. Draft environmental impact statement  

SciTech Connect (OSTI)

Western Area Power Administration (Western) proposes to uprate its existing 115-kV Flatiron-Erie transmission line. The line is located in Larimer, Weld and Boulder Counties, Colorado, and passes through the City of Longmont. The line connects Flatiron Substation and several of the substations supplying Longmont. It is a single circuit 115-kV line, 31.5 miles long, and was built in 1950-51 on a 75-foot wide right-of-way (ROW) using wood H-frame structures. Western proposes to build 27 new structures along the line, to replace or modify 45 of the existing structures and to remote 11 of them. Many of these additions and changes would involve structures that are approximately 5 to 15 feet taller than the existing ones. The existing conductors and ground wires would remain in place. The purpose of these actions would be to allow the power carrying capability of the line to be increased and to replace deteriorating/structural members. Western would be the sole participant in the proposed project. This report gives an analysis of the study area environment and the development of alternative routes. An assessment is presented of the impacts of the primary alternative routes. The environmental consequences of this project are addressed.

Not Available

1993-05-01T23:59:59.000Z

17

ATTACHMENT A PROJECT PERFORMANCE METRICS (DRAFT)  

E-Print Network [OSTI]

metrics submission. The focus areas are: weather, climate change and variability, atmospheric compositionATTACHMENT A PROJECT PERFORMANCE METRICS (DRAFT) REASoN projects are required to collect and report on the metrics noted in Table A. These data will be reported from the projects on a monthly basis with six month

Christian, Eric

18

EA-1891: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91: Draft Environmental Assessment EA-1891: Draft Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration issued a draft...

19

Draft Advanced Fossil Energy Projects Solicitation Public Comments  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Loan Programs Office: Draft Advanced Fossil Energy Projects Solicitation Public Comments

20

Salmon Creek Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

AUGUST 2004 AUGUST 2004 SALMON CREEK PROJECT Draft Environmental Impact Statement DOE/EIS-0346 Lead Agency U.S. Dept of Energy, Bonneville Power Administration Cooperating Agencies U.S. Dept of Interior, Bureau of Reclamation Confederated Tribes of the Colville Reservation Okanogan Irrigation District Salmon Creek Project Draft Environmental Impact Statement (DOE/EIS-0346) Responsible Agency: Bonneville Power Administration (BPA), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior, Bureau of Reclamation, Confederated Tribes of the Colville Reservation, Okanogan Irrigation District. County and State Involved: Okanogan County, Washington Abstract: BPA proposes to fund activities that would restore sufficient water flows to Salmon Creek and

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Condon Wind Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource acquisition strategy; and meeting the objectives of its Power Business Line's Strategic Plan. The Draft Environmental Impact Statement (DEIS) evaluates the environmental impacts of the Proposed Action (to execute one or more power purchase and transmission services agreements to acquire and transmit up to the full electric output of the proposed Condon Wind Project) and the No Action Alternative. BPA's preferred alternative is the Proposed Action. BPA has also identified the Proposed Action as the environmentally-preferred alternative. The proposed wind project is located on private agricultural land in Gilliam County, Oregon. The 38-acre project site is located within a 4,200-acre study area located on both sides of Oregon Highway 206, approximately 5 miles northwest of the town of Condon. The project would use modern, efficient 600-kilowatt (kW) wind turbines to convert energy in the winds to electricity that would be transmitted over the existing BPA transmission system. The project would consist of one or two phases: the first phase would use 41 wind turbines to yield a capacity of approximately 24.6 megawatts (MW). A second phase (if built) would use 42 wind turbines to yield a capacity of approximately 25.2 MW. For purposes of this DEIS, the size of the project is assumed to be 49.8 MW, built in two phases. Major components of the wind project include wind turbines and foundations, small pad-mounted transformers, an operation and maintenance building, power collection and communication cables, project access roads, meteorological towers on foundations, and a substation. During construction there would also be temporary equipment storage and construction staging areas. The first phase is proposed for construction in late 2001; the second phase could be constructed during spring/summer 2002 or later.

N /A

2001-06-01T23:59:59.000Z

22

BOSTON HARBOR, MASSACHUSETTS DEEP DRAFT NAVIGATION IMPROVEMENT PROJECT  

E-Print Network [OSTI]

BOSTON HARBOR, MASSACHUSETTS DEEP DRAFT NAVIGATION IMPROVEMENT PROJECT Civil Works Review Board Re-Presentation - 26 April 2013 ABSTRACT: The Boston Harbor Deep Draft Navigation Improvement Project consists entrance channels connecting Massachusetts Bay to the harbor, deep water anchorages in the harbor, a main

US Army Corps of Engineers

23

San Luis Rio Colorado Project Draft EIS  

Broader source: Energy.gov (indexed) [DOE]

Draft EIS Draft EIS i CONTENTS Acronyms and Abbreviations ........................................................................................................ xi S Summary ................................................................................................................................. I S.1 Purpose and Need for Agency Action ............................................................................II S.2 Applicants' Purpose and Goals..................................................................................... III S.3 Public Participation....................................................................................................... IV S.4 Alternatives ................................................................................................................

24

Northern Wind Project Draft Environmental Assessment Roberts...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Power Administration (Western) Forman-Summit 115 kilovolt (kV) transmission line 7.4 miles north of the Summit Substation. The Project is a federal action under the...

25

Preliminary Draft EIS  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement January 2012 DOE/EIS-0457 Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement Bonneville Power Administration January 2012 Abstract Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Draft Environmental Impact Statement i Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration Title of Proposed Project: Albany-Eugene 115-kilovolt No. 1 Transmission Line Rebuild Project State Involved: Oregon Abstract: Bonneville Power Administration is proposing to rebuild a 32-mile section of the Albany-

26

Energy Research and Development Division DRAFT PROJECT REPORT  

E-Print Network [OSTI]

Energy Research and Development Division DRAFT PROJECT REPORT NATURAL GAS ENERGY EFFICIENCY IN BUILDINGS Roadmap for Future Research Prepared for: California Energy Commission Prepared by: DNV KEMA Energy & Sustainability MARCH 2014 CEC5002014036D #12; PREPARED BY

27

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

ES-1 ES-1 ES.0 Summary In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). The proposed Project would be constructed by Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River Energy, Heartland Consumers Power District, Montana-Dakota Utilities Co., Southern Minnesota Municipal Power Agency, and

28

EIS-0486: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement EIS-0486: Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Draft EIS to evaluate the potential...

29

EIS-0483: EPA Notice of Availability of Draft Environmental Impact...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EPA announced the availability of a draft...

30

EIS-0447: EPA Notice of Availability of Draft Environmental Impact...  

Energy Savers [EERE]

of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to...

31

EIS-0325: Draft Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Impact Statement EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project This summary covers the major points of the Draft Environmental...

32

Office of Water Project Review And the Deep Draft Navigation  

E-Print Network [OSTI]

1 Office of Water Project Review And the Deep Draft Navigation Planning Center of Expertise US Army Corps of Engineers #12;Civil Works Project Delivery Process Step 10 Division Engineer's Transmittal Construction Funds Step 19 Execute PPA Step 20 Project Construction Step 15 Execute PED Agreement Step 11

US Army Corps of Engineers

33

Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement (DOE/EIS-0317) (January 10, 2003)  

Broader source: Energy.gov (indexed) [DOE]

8 8 Federal Register / Vol. 68, No. 7 / Friday, January 10, 2003 / Notices authorized to administer the NPDES Program incur a burden of 92,033 hours annually. Dated: January 6, 2003. James A. Hanlon, Director, Office of Wastewater Management. [FR Doc. 03-516 Filed 1-9-03; 8:45 am] BILLING CODE 6560-50-P ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-6636-6] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 or http://www.epa.gov/ compliance/nepa/. Weekly receipt of Environmental Impact Statements Filed December 30, 2002 Through January 03, 2003 Pursuant to 40 CFR 1506.9. EIS No. 030000, DRAFT EIS, FHW, TX, TX-121 Highway from Interstate Highway 30 to Farm-to-Market 1187 (FM 1187) in Forth Worth,

34

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

35

Draft Environmental Impact Statement for the Orlando Gasification Project  

Broader source: Energy.gov (indexed) [DOE]

3 3 DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE ORLANDO GASIFICATION PROJECT ORLANDO, FLORIDA August 2006 U.S. DEPARTMENT OF ENERGY COVER SHEET August 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) T ITLE Draft Environmental Impact Statement for the Orlando Gasification Project L OCATION Orlando, Florida C ONTACTS Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Mr. Richard A. Hargis, Jr., National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-6065. E-mail: Richard.Hargis@netl.doe.gov. For general information on DOE's NEPA process, contact Ms. Carol M. Borgstrom, Director, Office

36

Lyle Falls Fish Passage Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Lyle Falls Fish Passage Project Lyle Falls Fish Passage Project Draft Environmental Impact Statement DOE/EIS-0397 March 2008 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Lyle Falls Fish Passage Project Draft Environmental Impact Statement (DOE/EIS-0397) Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA); Confederated Tribes and Bands of the Yakama Nation (Yakama Nation); Washington Department of Fish and Wildlife (WDFW); U.S. Department of Agriculture, Forest Service (USFS), Title of Proposed Project: Lyle Falls Fish Passage Project State Involved: Washington (WA) Abstract: BPA proposes to fund modification of the existing Lyle Falls Fishway on the lower Klickitat River in

37

Draft  

Broader source: Energy.gov (indexed) [DOE]

Closing the Circle: Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994 Table of Contents Part I: Making of the Nuclear Weapons Complex, 1942-1955 1 The Manhattan Project: Genesis of the Complex 1 2 Health and Safety Concerns Environmental and Waste Management Concerns 3 The Atomic Energy Commission: Expansion of the Complex

38

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 EFSEC Washington State Energy Facility Site Evaluation Council September 5, 2003 Dear Reader: Enclosed for your review is the Draft Environmental Impact Statement (DEIS) for the proposed BP Cherry Point Cogeneration Project. The proponent, BP West Coast Products, LLC, has requested to build a 720-Megawatt Gas-Fired Combined Cycle Cogeneration Facility in Whatcom County, Washington, and interconnect this facility into the regional power transmission grid. To integrate the new power generation into the transmission grid, Bonneville Power Administration (Bonneville) may need to re-build 4.7 miles of an existing 230-kV

39

Draft Environmental Impact Statement for FutureGen Project  

Broader source: Energy.gov (indexed) [DOE]

DOE/EIS-0394D FUTUREGEN PROJECT EIS DOE/EIS-0394D FUTUREGEN PROJECT EIS DRAFT TABLE OF CONTENTS MAY 2007 i TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................ i LIST OF ACRONYMS ................................................................................... LIST OF ACRONYMS - 1 VOLUME I 1. PURPOSE AND NEED FOR AGENCY ACTION ......................................................................1-1 1.1 INTRODUCTION......................................................................................................................1-1 1.2 PROPOSED ACTION ...............................................................................................................1-1 1.3 PURPOSE AND NEED FOR AGENCY ACTION...................................................................1-2

40

MESABA ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME  

Broader source: Energy.gov (indexed) [DOE]

MESABA ENERGY PROJECT MESABA ENERGY PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 DOE/EIS-0382D MN PUC DOCKET # E6472/GS-06-668 U.S. Department of Energy in cooperation with Minnesota Department of Commerce Office of Fossil Energy National Energy Technology Laboratory NOVEMBER 2007 COVER SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Responsible State Agency: Minnesota Department of Commerce (MDOC) Cooperating Agencies: U.S. Army Corps of Engineers and U.S. Department of Agriculture Forest Service Title: Mesaba Energy Project, Draft Environmental Impact Statement (DOE/EIS-0382D) Location: Taconite Tax Relief Area of northeastern Minnesota, Itasca and St. Louis Counties Contact: For further information about this Environmental Impact Statement, contact:

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

42

Draft Environmental Impact Statement Klondike III/Biglow Canyon Wind Integration Project  

Broader source: Energy.gov (indexed) [DOE]

Summary S-1 Summary S-1 Summary In this Summary: * Purpose and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the draft Environmental Impact Statement (EIS) prepared for the Klondike III/Biglow Canyon Wind Integration Project proposed by the Bonneville Power Administration (BPA). The project includes constructing a new double-circuit 230-kilovolt (kV) transmission line in northern Sherman County, Oregon. The new line would connect the Klondike III Wind Project and the Biglow Canyon Wind Farm to BPA's existing John Day 500-kV Substation. The project would also require expansion of BPA's existing John Day 500-kV Substation and a new 230-kV substation to integrate the two wind projects. As a federal agency, BPA is required by the National Environmental Policy Act

43

EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

44

GRR/Elements/14-CA-c.11 - Updated Draft Project Approval Letter | Open  

Open Energy Info (EERE)

1 - Updated Draft Project Approval Letter 1 - Updated Draft Project Approval Letter < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-c.11 - Updated Draft Project Approval Letter The DOGGR State Board prepares an Updated Draft Project Approval Letter, reflecting the the public comments and Regional Board' proposed revisions. Logic Chain No Parents \V/ GRR/Elements/14-CA-c.11 - Updated Draft Project Approval Letter (this page) \V/ No Dependents Under Development Add.png Add an Element Retrieved from "http://en.openei.org/w/index.php?title=GRR/Elements/14-CA-c.11_-_Updated_Draft_Project_Approval_Letter&oldid=539626" Categories: Geothermal Regulatory Roadmap Elements Under Development What links here Related changes

45

Line Rebuild, Relocation and Substation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Palisades-Goshen Rebuild Wind Projects Line Rebuild, Relocation and Substation Projects BPA has identified several critical rebuild and substation projects...

46

Yakima Fisheries Project : Revised Draft Environmental Impact Statement.  

SciTech Connect (OSTI)

BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

United States. Bonneville Power Administration.

1995-05-01T23:59:59.000Z

47

Review Draft Review Draft  

E-Print Network [OSTI]

Review Draft Review Draft Columbia Basin White Sturgeon Planning Framework Prepared a favorable review of specific sturgeon projects but noted that an effective basin-wide management plan passage. A planning framework (this document) was drafted based on a review and synthesis of published

48

DOE Issues Draft RFP for Idaho Cleanup Project Core | Department...  

Office of Environmental Management (EM)

on the Draft RFP is available at: https:www.emcbc.doe.govSEBICPCOREindex.php. DOE has requested that all comments, questions, suggested changes, and feedback should...

49

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENT, FISH AND WILDLIFE August 30, 2002 In reply refer to: T To: People Interested in the McNary-John Day Transmission Line Project Bonneville Power Administration (Bonneville) has finalized the enclosed Environmental Impact Statement (EIS) for the McNary-John Day Transmission Line Project. In March, we sent you the draft EIS, asked for your comments and had three public meetings. The response was great; we received about 350 comments on the draft document. Thank you for taking the time to read the document and tell us your ideas. This letter briefly describes the final EIS, outlines our next steps and tells where to call if you have questions. The final EIS is abbreviated, consisting of an introduction to the document, changes to the draft

50

Proposed Project: Plains & Eastern Clean Line  

Broader source: Energy.gov [DOE]

On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Lines proposal was responsive to the RFP, and it is currently under consideration.

51

EIS-0483: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado Western Area Power Administration prepared a...

52

EIS-0317-S1: Draft Supplemental Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power Administration is proposing to build a new...

53

EIS-0414: DOE Notice of Availability of the Draft Environmental...  

Energy Savers [EERE]

of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public comment. (September 2010) (75 FR 57005) Notice of...

54

EA-1960: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment EA-1960: Draft Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western Area...

55

EIS-0332: Draft Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Impact Statement EIS-0332: Draft Environmental Impact Statement McNary-John Day Transmission Line Project Bonneville is proposing to construct, operate, and maintain a...

56

EIS-0422: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to...

57

EA-1896: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment EA-1896: Draft Environmental Assessment Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, ND This EA...

58

EIS-0414: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of Availability of the Draft Environmental Impact Statement Energia Sierra Juarez U.S. Transmission Line Project, Construction, Operation, Maintenance, and Connection of either...

59

EIS-0505: Draft Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0505: Draft Environmental Impact Statement Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington The Bureau of...

60

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

and and Wallula - McNary Transmission Line Project Final Environmental Impact Statement DOE/EIS-0330 Lead Agencies Bonneville Power Administration Washington State Energy Facility Site Evaluation Council Cooperating Agencies Bureau of Land Management U.S. Fish and Wildlife Service August 2002 EFSEC Washington State Energy Facility Site Evaluation Council August 2002 Dear Reader: Enclosed for your reference is the abbreviated form Final Environmental Impact Statement (FEIS) for the proposed Wallula Power Project and Wallula-McNary Transmission Line Project. This document is designed to supplement or correct information provided in the Draft Environmental Impact Statement (DEIS). The proponent, Wallula Generation, LLC, has requested to build a 1,300-megawatt, gas-fired

62

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

63

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

64

Final Map Draft Comparison Report WIND ENERGY RESOURCE MODELING AND MEASUREMENT PROJECT  

E-Print Network [OSTI]

II Final Map Draft Comparison Report #12;WIND ENERGY RESOURCE MODELING AND MEASUREMENT PROJECT Tel: 978-749-9591 Fax: 978-749-9713 mbrower@awstruewind.com August 10, 2004 #12;2 WIND ENERGY RESOURCE issues. 1 Background In Task 2 of the project, five promising areas of the state for wind energy

65

UMore Park Wind Turbine Project Loggerhead Shrike Survey Draft Report to Barr Engineering  

Broader source: Energy.gov (indexed) [DOE]

UMore Park Wind Turbine Project UMore Park Wind Turbine Project Loggerhead Shrike Survey Draft Report to Barr Engineering Lee A. Pfannmuller June 15, 2010 [1] UMore Park Wind Turbine Project Loggerhead Shrike Survey Report to Barr Engineering Lee A. Pfannmuller June 15, 2010 Project Area The University of Minnesota owns approximately 5,000 acres in Dakota County, known as the University of Minnesota Outreach, Research and Education (UMore) Park. A concept master plan was developed

66

Navajo Transmission Project Draft Environmental Impact Statement (DEIS)  

Broader source: Energy.gov (indexed) [DOE]

. . SUMRY INTRODUCTION Din6 Power Authority @PA), a Navajo Nation enterprise, proposes to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project ~), is currentiy planned to be in service in the year 2001 and operate for about 50 years. The preparation of an environment impact statement @IS) is required because of Federal government involvement, which includes (1) granting rights-of-way across Federrd and tribal lands and (2) certain participation by Western Area Power Administration ~estem), and agency of the U.S. Department of Energy (DOE). In accordance the National Environmental Policy Act of 1969 ~PA), Council on Environmental Quality (CEQ) regulations

67

Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement  

SciTech Connect (OSTI)

Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or conductors, and two neutral ground wires that would provide both lightning protection and fiber optic communications, on a single set of support structures. The transmission line would originate at TEP's existing South Substation (which TEP would expand), in the vicinity of Sahuarita, Arizona, and interconnect with the Citizens Communications (Citizens) system at a Gateway Substation that TEP would construct west of Nogales, Arizona. The double-circuit transmission line would continue from the Gateway Substation south to cross the U.S.-Mexico border and extend approximately 60 miles (mi) (98 kilometers [km]) into the Sonoran region of Mexico, connecting with the Comision Federal de Electricidad (CFE, the national electric utility of Mexico) at CFE's Santa Ana Substation.

N /A

2003-08-27T23:59:59.000Z

68

DRAFT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

User Access Policy - Version 1.0 User Access Policy - Version 1.0 DOE NSRC User Access Policy December 9, 2002 page 1 DRAFT General Policies and Procedures for User Access to the DOE Nanoscale Science Research Centers 1. Preamble The mission of the U.S. Department of Energy (DOE) Nanoscale Science Research Centers (NSRCs) is to support users in doing outstanding science in a safe environment. To this end, each Center must have: * An array of state-of-the-art equipment and laboratories for synthesis, fabrication, characterization, and simulation of nanoscale materials and structures * A skilled staff to support this equipment, users, and the associated science but above all * A user scientific program that provides leadership in nanoscale science and technology This document addresses the policies and procedures for user access to the NSRCs.

69

Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.  

SciTech Connect (OSTI)

BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

70

"FutureGen 2.0 Project Draft Environmental Impact Statement Summary"  

Broader source: Energy.gov (indexed) [DOE]

SHEET SHEET Responsible Federal Agency: U.S. Department of Energy (DOE) Cooperating Agencies: None Title: Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) Location: Morgan County, Illinois Contact: For further information about this Environmental Impact Statement, contact: For general information on the DOE process for implementing the National Environmental Policy Act,

71

Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects  

Broader source: Energy.gov [DOE]

The Department of Energy has issued a draft solicitation that would provide up to $12.6 billion in loan guarantees for Advanced Nuclear Energy Projects, supporting the Administrations all-of-the-above energy strategy and bringing the nation closer to its low-carbon future.

72

DRAFT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

⇒ ⇒ DRAFT 19 December 2012⇐= Status of the heaviest elements as of January 2013 Don Groom, Particle Data Group Superheavy elements are normally synthesized by exposing a high-Z target to a 2.5-7.5 MeV/u ion beam such as 48 Ca or 70 Zn. The target can be a stable isotope such as 208 Pb or 209 Bi; in this case the process is called cold fusion. If the target is radioactive (an actinide), it is a "hot fusion" reaction. Targets as heavy as 249 Bk have been used. Since fusion is followed by neutron loss (e.g. 248 Cf( 48 Ca,4n) 292 Lv), the atomic numbers of the beam and target nuclei determine whether the fusion products have even or odd Z. The main laboratories involved are at Dubna, Darmstadt, Berkeley, and RIKEN Nashina Center. Fusion cross sections steadily decrease with increasing Z, and are in the picobarn range for the heaviest elements. The cross section can be optimized for a given

73

DOE/EIS-0395; San Luis Rio Colorado Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

note: Missing pages contain figures which can be found in the "Figures" folder note: Missing pages contain figures which can be found in the "Figures" folder on the San Luis Rio Colorado Project Draft Environmental Impact Statement compact disc (CD). Some of the figures were removed from this file to decrease file size for ease of downloading and/or viewing. San Luis Rio Colorado Project Draft EIS I S SUMMARY The U.S. Department of Energy (DOE) received applications from North Branch Resources, LLC (NBR) and Generadora del Desierto S.A. de C.V. (GDD) for the proposed San Luis Rio Colorado Project (Proposed Project). GDD and NBR (collectively termed the Applicants) are each wholly owned subsidiaries of North Branch Holding, LLC. GDD applied to the Office of Electricity Delivery and Energy Reliability (OE), an organizational unit within DOE, for a

74

DOE/EIS-0325; Environmental Impact Statement for Schultz-Hanford Area Transmission Line Project (02/2002)  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement Summary Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Summary S-1 Summary In this Summary: * The Purposes and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the Draft Environmental

75

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

76

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers [EERE]

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

77

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers [EERE]

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

78

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Broader source: Energy.gov (indexed) [DOE]

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

79

EIS-0399: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct,...

80

DOE/EIS-03321: Condon Wind Project Draft Environmental Impact Statement (05/01)  

Broader source: Energy.gov (indexed) [DOE]

1 1 Draft Environmental Impact Statement DOE/EIS-0321 CONDON WIND PROJECT Condon Wind Project Draft Environmental Impact Statement (DOE/EIS-0321) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Condon Wind Project States Involved: Oregon Abstract: BPA needs to acquire resources to meet its customers' load growth. In meeting that need for power, BPA will consider the following purposes: protecting BPA and its customers against risk by diversifying its resource portfolio; assuring consistency with its responsibilities under the Pacific Northwest Electric Power Planning and Conservation Act to encourage the development of renewable resources; meeting customer demand for renewable resources; assuring consistency with its resource

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final EIS Appendix A: Revised Mitigation Measures Final EIS Appendix A: Revised Mitigation Measures August 2002 Page A-1 Appendix A Revised Mitigation Measures The proposed project includes measures that would limit construction and operation impacts to elements of the natural and human environment. These measures are presented for each element of the environment identified as a potential concern by Bonneville and EFSEC based on preliminary environmental review and public and regulatory agency input. Updates to the mitigation table below are in response to comments on the Draft EIS or to incorporate new information included in the Settlement Agreements. Mitigation Measure Power Plant Pipelines Bonneville T-Line EARTH Seismicity Facilities would be designed to meet regional seismic design criteria as presented in the Uniform Building Code (UBC). X X

82

Holomorphic Structures on the Quantum Projective Line  

Science Journals Connector (OSTI)

......Projective Line Masoud Khalkhali 1 Giovanni Landi 2 3 Walter Daniel van Suijlekom 4 Correspondence to be sent to: waltervs@math...Modern Physics Letters A (2003) 18:2371-80. 13 Dubois-Violette M. , Masson T. On the first-order operators in bimodules......

Masoud Khalkhali; Giovanni Landi; Walter Danil van Suijlekom

2011-01-01T23:59:59.000Z

83

Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation  

Broader source: Energy.gov [DOE]

The Energy Department issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the United States that avoid, reduce, or sequester greenhouse gases.

84

Draft  

Broader source: Energy.gov (indexed) [DOE]

24, 2005, 11:00 a.m.-12:30 p.m. EST 24, 2005, 11:00 a.m.-12:30 p.m. EST Conference Call Minutes Participants: Co-Chairs: Jay Jones (RW), Alex Thrower (EM) Members: Jane Beetem (MO Department of Natural Resources), Kevin Blackwell (FRA), Ray English (Office of Naval Reactors, DOE), Bob Fronczak (Association of American Railroads), Bob Halstead (Nevada Agency for Nuclear Projects), Eric Huang (DOE), Paul Johnson (ORNL), Doug Larson (Western Interstate Energy Board [WIEB]), Adam Levin (Exelon Generation Company), Jim Reed (NCSL), Conrad Smith (CSG-East), Steve Sullivan (American Shortline Railroad Association),Ruth Weiner (Sandia National Laboratories) Contractor Support: Ralph Best (BSC), Randy Coppage (BAH),Ed Davis (BSC), Michele Enders (SAIC), Lee Finewood (BAH),and Ron Ross (BSC)

85

DRAFT  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

03/1195 03/1195 Healy Clean Coal Project A DOE Assessment Office of Fossil Energy National Energy Technology Laboratory U.S. Department of Energy September 2003 Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement,

86

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH  

E-Print Network [OSTI]

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH Subject: Project Schedule Project Duration: May 27 to August 10, 2014 The sewer line will be constructed in phases

Ickert-Bond, Steffi

87

Supplemental Draft Environmental Impact StatementS Big Stone II Power Plant and Transmission Project  

Broader source: Energy.gov (indexed) [DOE]

Lead Agency: U.S. Department of Energy, Western Area Power Administration Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Rural Utilities Service U.S. Department of Defense, Army Corps of Engineers Title: Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement Location: Proposed Big Stone II Plant: Big Stone City, South Dakota Proposed Transmission Facilities: Northeastern South Dakota and Southwestern Minnesota Contacts: For additional information on this Supplemental Draft Environmental Impact Statement, or to receive a copy, contact: For general information on the DOE National Environmental Policy Act process, write or call: Ms. Nancy Werdel Western Area Power Administration

88

DOE/EIS-0289; Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project, August 1999  

Broader source: Energy.gov (indexed) [DOE]

Draft Draft ENVIRONMENTAL IMPACT STATEMENT FOR THE JEA CIRCULATING FLUIDIZED BED COMBUSTOR PROJECT JACKSONVILLE, FLORIDA August 1999 U.S. DEPARTMENT OF ENERGY COVER SHEET August 1999 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Draft Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project; Jacksonville, Duval County, Florida CONTACT Additional copies or information concerning this draft environmental impact statement (EIS) can be obtained from Ms. Lisa K. Hollingsworth, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, Federal Energy Technology Center, 3610 Collins Ferry Road, P. O. Box 880, Morgantown, WV 26507-0880. Telephone: (304) 285-4992. Fax: (304) 285-4403. E-mail: lisa.hollingsworth@fetc.doe.gov.

89

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Draft Environmental Impact Statement Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

90

EIS-0377: Supplemental Draft Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

77: Supplemental Draft Environmental Impact Statement 77: Supplemental Draft Environmental Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power Administration (Western), Rural Utilities Service (RUS), and U.S. Army Corps of Engineers (USACE) issued the Big Stone II Power Plant and Transmission Project Draft Environmental Impact Statement (Draft EIS, DOE/EIS-0377). The Draft EIS described the details of constructing and operating a nominal 600-megawatt (MW), coal-fired, baseload electric generating facility and associated transmission line and substation upgrades, known as the Big Stone II Project (proposed Project). Western determined that the use of groundwater as the back-up water supply would significantly change the environmental impacts of the proposed

91

Notice of Availability of Plains & Eastern Clean Line Transmission...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242 -...

92

Draft Environmental Impact Statement for the Orlando Gasification Project  

Broader source: Energy.gov (indexed) [DOE]

This environmental impact statement (EIS) has been prepared by the U.S. Department of Energy (DOE), in compliance with the National Environmental Policy Act of 1969 (NEPA) as amended (42 USC 4321 et seq.), Council on Environmental Quality regulations for implementing NEPA (40 CFR Parts 1500-1508), and DOE NEPA regulations (10 CFR Part 1021). The EIS evaluates the potential environmental impacts associated with the construction and operation of a project which was proposed by Southern Company in partnership with the Orlando Utilities Commission (OUC) and which has been selected by DOE under the Clean Coal Power Initiative (CCPI) program. The proposed project would demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC)

93

BP Cherry Point Cogeneration Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Appendices Appendices DOE/EIS-0349 Lead Agencies: Energy Facility Site Evaluation Council Bonneville Power Administration Cooperating Agency: U.S. Army Corps of Engineers September 5, 2003 SITING AND WETLAND 404(b)1 ALTERNATIVES ANALYSIS BP CHERRY POINT COGENERATION PROJECT [REVISED] Prepared for: BP West Coast Products, LLC Submitted by: Golder Associates Inc. March 2003 013-1421.541 March 2003 i 013-1421.541 TABLE OF CONTENTS Page No. 1. INTRODUCTION 1 2. PURPOSE AND NEED 5 3. ALTERNATIVES 6 3.1 No Action Alternative 6 3.1.1 Self-Reliance 6 3.1.2 Efficiency 6 3.1.3 Reliability 6 3.1.4 Other Impacts of the No Action Alternative 7 3.2 Project Site Location Alternative Selection Process 7 3.2.1 Sufficient Acreage Available

94

BPA/Puget Power Northwest Washington Transmission Project : Summary of the Supplemental Draft Environmental Statement.  

SciTech Connect (OSTI)

BPA and Puget Sound Power and Light (Puget Power) are proposing to upgrade the existing electric transmission power system in the Whatcom and Skagit County area of northwest Washington to increase the capacity of the US-Canada Intertie transmission system. The project would satisfy the need to provide more ability to store and return energy with Canada, would provide additional capacity on the Intertie for anticipated increases in power transactions, and would increase flexibility in operation of the US and Canadian hydroelectric system. It would protect Puget Power`s local system against thermal overloads, and improve local reliability. In November 1993, Bonneville Power Administration (BPA), and Whatcom County (Washington) published a draft environmental impact statement (DEIS) for the proposed Northwest Washington Transmission Project. In order to present some shifts in need for the project and to permit additional review, BPA and Whatcom County have elected to issue a Supplemental Draft EIS. This Summary presents background material, explains project needs and purposes, and then focuses on alternatives and the possible effects.

United States. Bonneville Power Administration.

1995-04-01T23:59:59.000Z

95

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4,...

96

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0394: EPA Notice of Availability of the Draft Environmental Impact

97

Draft environmental assessment -- Test Area North pool stabilization project update  

SciTech Connect (OSTI)

The purpose of this Environmental Assessment (EA) is to update the ``Test Area North Pool Stabilization Project`` EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped form the Ea/FONSI issued May 6, 1996. The origin and nature of the TMI core debris and the proposed drying process are described and analyzed in detail in this EA. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

NONE

1997-06-01T23:59:59.000Z

98

Proposed Project: Plains & Eastern Clean Line | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Proposed Project: Plains & Eastern Clean Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line's proposal was responsive to the RFP, and it is currently under consideration. The proposed Plains & Eastern Clean Line project (the proposed project) would include an overhead +/- 600 kV direct current electric transmission system and associated facilities with the capacity to deliver approximately

99

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

100

Port Angeles-Juan de Fuca Transmission Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

This summary includes information regarding the following elements of the draft environmental impact statement (EIS) prepared for the Port Angeles-Juan de Fuca Transmission Project: * purpose and need for action; * Proposed Action and No Action Alternative; and * affected environment, environmental impacts, and mitigation measures. S.1 Purpose and Need for Action Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Broader source: Energy.gov (indexed) [DOE]

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

102

Draft Advanced Nuclear Energy Solicitation Fact Sheet | Department...  

Broader source: Energy.gov (indexed) [DOE]

Fact Sheet Draft Advanced Nuclear Energy Solicitation Fact Sheet Draft Advanced Nuclear Energy Projects Solicitation Fact Sheet (September 2014) More Documents & Publications Draft...

103

EA-1912: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA This EA evaluates the potential environmental impacts of a proposal to rebuild its 115-kilovolt(kV) wood-pole Midway-Benton No. 1 transmission line and the BPA-owned portion of the 115-kV wood-pole Benton-Othello No. 1 transmission line. The lines are aging and require replacing wood-pole structures and other components of the transmission line. The Midway-Benton No. 1 and Benton-Othello No. 1 transmission lines currently follow the 230-kV steel Midway-Benton No. 2 transmission line. At this time, BPA is not proposing any work on the Midway-Benton No. 2 transmission line. Consolidated Draft PEA_5-10-12 More Documents & Publications

104

EIS-0344: Draft Envrionmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

4: Draft Envrionmental Impact Statement 4: Draft Envrionmental Impact Statement EIS-0344: Draft Envrionmental Impact Statement Grand Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project. Bonnewille Power Administration (BPA) would construct a new 500-kilovolt (kV) transmission line that would replace a single-circuit 115-kV transmission line in an exisiting corridor that has multiple transmission lines for most of the project's length. The transmission line would extend between the Grand Coulee 600-kV Switchyard and Bell Substation near Spokane, a distance of 84 miles. Detailed information about the project and its environmental impacts

105

Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation  

Broader source: Energy.gov [DOE]

In support of the Administrations all-of-the-above energy strategy, the Department of Energy issued a draft loan guarantee solicitation today for innovative renewable energy and energy efficiency projects located in the U.S. that avoid, reduce, or sequester greenhouse gases.

106

UMore Park Sand and Gravel Resources Project Draft Environmental Impact Statement (EIS), June 28, 2010 Errata Sheet  

E-Print Network [OSTI]

onsite receiving water impacts would meet existing MPCA criteria for deep lakes. #12;UMore Park Sand and Gravel Resources Project Draft Environmental Impact Statement (EIS), June 28 causes a reduction in the volume of storm water runoff reaching the Vermillion River. Table 17 summarizes

Netoff, Theoden

107

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

108

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

109

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Broader source: Energy.gov (indexed) [DOE]

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

110

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Broader source: Energy.gov (indexed) [DOE]

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

111

EIS-0317: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

7: EPA Notice of Availability of the Draft Environmental 7: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement EIS-0317: EPA Notice of Availability of the Draft Environmental Impact Statement Supplement Kangley-Echo Lake Transmission Line Project Notice of availability of the Kangley-Echo Lake Transmission Line Project construction of a new 500 kilovolt (kV) transmission line draft environmental impact statement supplement with updated information on the reevaluating alternative not analyzed, COE Section 10 and Permits, King County, WA. Environmental Protection Agency Notice of Availability of the Kangley-Echo Lake Transmission Line Project Draft Environmental Impact Statement Supplement, DOE/EIS-0317 (January 2003) (68 FR 1458) More Documents & Publications EIS-0386: EPA Notice of Availability of the Programmatic Final

112

EIS-0379: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

79: EPA Notice of Availability of the Draft Environmental 79: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0379: EPA Notice of Availability of the Draft Environmental Impact Statement Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project EIS No. 20070305, Draft EIS, BPA, MT, Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, Rebuilding Transmission Line between Libby and Troy, Lincoln County, Montana DOE/EIS-0379, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Libby (FEC) to Troy Section of BPA's Libby to Bonner Ferry 115-kilovolt Transmission Line Project, 72 FR 39808 (July 2007) More Documents & Publications EIS-0464: EPA Notice of Availability of Final Environmental Impact

113

Northern Pass Transmission Line Project Environmental Impact Statement:  

Broader source: Energy.gov (indexed) [DOE]

Northern Pass Transmission Line Project Environmental Impact Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 DOE has changed the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On September 6, 2013, the U.S. Department of Energy (DOE) published in the Federal Register an amended Notice of Intent (NOI) to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement

114

Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment Environmental Assessment for the GILA-NORTH GILA TRANSMISSION LINE REBUILD AND UPGRADE PROJECT (DOE/EA-1948) December 2013 Prepared for U.S. Department of Energy Western Area Power Administration, Desert Southwest Region Prepared by Cooperating Agencies U.S. Bureau of Reclamation, Yuma Area Office U.S. Army Corps of Engineers, Los Angeles District DRAFT Gila to North Gila Transmission Line Rebuild and Upgrade Project Environmental Assessment Prepared for: U.S. Department of Energy Western Area Power Administration Desert Southwest Region Cooperating Agencies: U.S. Bureau of Reclamation Yuma Area Office U.S. Army Corps of Engineers Los Angeles District Prepared by: December 2013 Gila to North Gila Transmission Line Rebuild and Upgrade Project

115

Draft Environmental Impact Statement Klondike III/Biglow Canyon Wind Integration Project  

Broader source: Energy.gov (indexed) [DOE]

generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. To interconnect these projects, BPA would need to build and operate a 230-kV double-circuit transmission line about 12 miles long, expand one substation and build one new substation. The wind projects would require wind turbines, substation(s), access roads, and other facilities. Two routes for the transmission line are being considered. Both begin at PPM's Klondike Schoolhouse Substation then travel north (Proposed Action) or north and westerly (Middle Alternative) to a new BPA

116

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

117

EIS-0422: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0422: EPA Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington. Notice of Availability of the Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line, Garfield, Columbia and Walla Walla Counties, Washington, DOE/EIS-0422 (July 2010 - 75 FR 38517) More Documents & Publications EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft

118

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. Additional information is available at the project...

119

A projective Simson line Geoff Smith, University of Bath  

E-Print Network [OSTI]

A projective Simson line Geoff Smith, University of Bath 15th October 2014 This is a preprint-profit making educational or research pur- poses. c G. C. Smith October 15 2014 Introduction Let ABC

Smith, Geoff

120

Proposed Project: Plains & Eastern Clean Line | Department of...  

Broader source: Energy.gov (indexed) [DOE]

published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In...

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

122

Community interviews task report: Working draft: BWIP (Basalt Waste Isolation Project) Repository Project  

SciTech Connect (OSTI)

The socioeconomic program for the Basalt Waste Isolation Project (BWIP) requires the collection of information about economic, social and cultural conditions, demographic, housing and settlement patterns, and the provision of public services and facilities in order to monitor and assess the impacts of the project on the study area. Much of the information needed by the socioeconomic program is compiled, maintained, and used by officials or staff members of local, regional, state, or tribal agencies or organizations. Because much of this information is prepared for internal use, the documents are often not published or advertised and it can be difficult for researchers to identify many obscure, yet useful, sources of information. In order to identify and gain access to this information, it is often most efficient to talk directly with officials and staff members of pertinent agencies or organizations who may have knowledge of these documents or who may have useful information themselves. Consequently, interviews in the study communities with persons knowledgeable about the socioeconomic or sociocultural characteristics of the area constitute an important source of data for the socioeconomic program. In addition to identifying various data sources, these interviews provide a mechanism for understanding and interpreting those data. Knowledge of specific local conditions is often necessary to correctly interpret quantitative data. The purpose of this paper is to summarize the objectives of the community interviews task and the general methods that will be used in conducting the community interviews. 3 refs.

Bolton, P.A.

1987-11-01T23:59:59.000Z

123

Department of Energy Issues Draft Renewable Energy and Efficient...  

Broader source: Energy.gov (indexed) [DOE]

Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects...

124

Department of Energy Issues Draft Loan Guarantee Solicitation...  

Broader source: Energy.gov (indexed) [DOE]

Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects...

125

Draft General Conformity Determination  

Broader source: Energy.gov (indexed) [DOE]

I I Draft General Conformity Determination U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix I Draft General Conformity Determination Draft General Conformity Determination Cape Wind Energy Project Prepared by Minerals Management Service Herndon, VA November 2008 i TABLE OF CONTENTS 1.0 INTRODUCTION TO THE PROPOSED ACTION............................................................... 1 2.0 GENERAL CONFORMITY REGULATORY BACKGROUND .......................................... 2 2.1 GENERAL CONFORMITY REQUIREMENTS.................................................................... 2 2.2 GENERAL CONFORMITY APPLICABILITY.....................................................................

126

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

447: Champlain Hudson Power Express Transmission Line Project, 447: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line will run from the Canadian Province of Quebec to New York City. DOE also published a notice correcting the location of the public hearing that was held on November 19, 2013. Public Comment Opportunities As of December 6, 2013 - Comment Period Extended through 1/15/14 Written comments must be received by January 15, 2014. Comments submitted

127

Libby-Troy Line Rebuild Project - July 25, 2008  

Broader source: Energy.gov (indexed) [DOE]

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

128

EIS-0399: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct, operate, maintain, and connect a 230-kV electric transmission line; Issuance of Presidential Permit for right-to-way grant in Cascade, Teton, Chouteau, Pondera, Toole and Glacier Counties Montana. Environmental Protection Agency Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line, DOE/EIS-0399 (February 2008) (73 FR 8869) More Documents & Publications

129

EIS-0399: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

399: EPA Notice of Availability of the Draft Environmental 399: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0399: EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line project to construct, operate, maintain, and connect a 230-kV electric transmission line; Issuance of Presidential Permit for right-to-way grant in Cascade, Teton, Chouteau, Pondera, Toole and Glacier Counties Montana. Environmental Protection Agency Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line, DOE/EIS-0399 (February 2008) (73 FR 8869) More Documents & Publications

130

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

131

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

SciTech Connect (OSTI)

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Michael Lane

2012-01-01T23:59:59.000Z

132

EIS-0231: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. EIS-0231-DEIS-1996.pdf More Documents & Publications EA-1470: Final Environmental Assessment EIS-0256: Final Environmental Impact Statement

133

EIS-0427: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by Foresight Flying M, LLC, would include: 1) a wind energy generating facility up to 500 megawatts; 2) a 345- kilovolt (kV) electrical transmission tie-line; and 3) a 345-kV electrical interconnection switchyard that would be owned and operated by Western. The wind energy generating facility would be located on private land and trust land administered by the Arizona State Land Department. The document was distributed in two volumes. DOE/EIS-0427: Draft Environmental Impact Statement for the Grapevine Canyon Project (July 2010) Volume 1 EIS-0427-DEIS-02-2010.pdf

134

EIS-0447: EPA Notice of Availability of Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York EPA announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. EIS-0447-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement

135

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

136

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Broader source: Energy.gov (indexed) [DOE]

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

137

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

138

EA-1617: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1617: Draft Environmental Assessment Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project Western Area Power Administration, Rocky Mountain Customer Service Region (Western) proposes to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kilovolt (kV) transmission lines, located in Big Horn County, Wyoming and Big Horn and Carbon Counties in Montana and the Basin-Lovell (BA-LV) 115-kV transmission line in Big Horn County, Wyoming. The LV-YT No. 1 and 2 transmission lines parallel each other and are approximately 47 miles in length with termination points at the Yellowtail Substation near Fort Smith, Montana and the Lovell Substation near Lovell, Wyoming. The BA-LV transmission line is approximately 39 miles in length with termination

139

EIS-0422: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

422: Draft Environmental Impact Statement 422: Draft Environmental Impact Statement EIS-0422: Draft Environmental Impact Statement Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project, Proposing to Construct, Operate, and Maintain a 38 to 40-Mile-Long 500-kilovolt (kV) Transmission Line PA is proposing to construct, operate, and maintain a 38- to 40-mile-long 500-kilovolt (kV) transmission line in Garfield, Columbia, and Walla Walla counties, Washington. The proposed line would extend west from BPA's planned Central Ferry Substation in Garfield County to BPA's Lower Monumental Substation located in Walla Walla County. BPA is considering four routing alternatives for the proposed Central Ferry-Lower Monumental transmission line; portions of all four routes would parallel existing BPA

140

EIS-0414: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

4: DOE Notice of Availability of the Draft Environmental 4: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public comment. (September 2010) (75 FR 57005) Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the Proposed Energia Sierra Juarez U.S. Transmission Project (ESJ-U.S.), EIS-0414 (September 2010) More Documents & Publications Addressing Policy and Logistical Challenges to Smart Grid Implementation:

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Notice of Intent to Prepare Supplemental Draft Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement EIS-0478: Notice of Intent to Prepare Supplemental Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project, Mercer, Dunn, Billngs, Williams, McKenzie, and Mountrail Counties, ND To address an increase in the electric load forecast for western North Dakota, the USDA Rural Utilities Service issued a notice of intent to prepare a supplement to its December 2012 Draft EIS. The supplement will analyze a new alternative for a proposed transmission line from Antelope Valley to Neset, North Dakota. DOE's Western Area Power Administration (WAPA), a cooperating agency, would modify its existing Williston Substation to allow a connection of the proposed new transmission line to

142

EA-1948: Draft Environmental Assessment | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8: Draft Environmental Assessment 8: Draft Environmental Assessment EA-1948: Draft Environmental Assessment Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. EA-1948-DEA-2013.pdf More Documents & Publications CX-007149: Categorical Exclusion Determination CX-007150: Categorical Exclusion Determination CX-007151: Categorical Exclusion Determination

143

First draft  

Broader source: Energy.gov (indexed) [DOE]

Planning: Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group By The Regulatory Assistance Project Bob Anderson Associate Draft January 15, 2004 Transmission Planning: Institutional Issues in the West Page i Table of Contents Introduction......................................................................................................................... 1 Background-The Existing Transmission Planning Landscape......................................... 3 Interconnection-wide Transmission Planning ................................................................ 3 Seams Steering Group-Western Interconnection (SSG-WI) ...................................... 3 Western Electricity Coordinating Council (WECC)...................................................

144

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1: Draft Environmental Impact Statement 1: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

145

EIS-0451: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

51: Draft Environmental Impact Statement 51: Draft Environmental Impact Statement EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. EIS-0451-DEIS-Volume1-2013.pdf EIS-0451-DEIS-Volume2-2013.pdf More Documents & Publications EIS-0451: Notice of Intent to Prepare an Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement

146

EIS-0486: EPA Notice of Availability of Draft Environmental Impact...  

Energy Savers [EERE]

EPA Notice of Availability of Draft Environmental Impact Statement EIS-0486: EPA Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line...

147

EIS-0400: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0400: Draft Environmental Impact Statement Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO This EIS evaluates the environmental impacts of a proposal to rebuild and upgrade the Western Area Power Administration's 12-mile Granby Pumping Plant-Windy Gap 69-kV transmission line in Grand County, Colorado. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and decided to prepare an EIS instead of completing the EA. Further information about the project is available on the project website. EIS-0400-DEIS-2012.pdf More Documents & Publications EIS-0400: Final Environmental Impact Statement EIS-0400: Notice of Intent to Prepare an Environmental Impact Statement

148

Multi-tower line focus Fresnel array project  

SciTech Connect (OSTI)

As an alternative to conventional tracking solar thermal trough systems, one may use line focus Fresnel reflector systems. In a conventional Fresnel reflector design, each field of reflectors is directed to a single tower. However efficient systems of very high ground utilisation can be setup if a field of reflectors uses multiple receivers on different towers. This paper describes a line focus system, called the compact linear fresnel reflector system and a project to produce an initial 95 MWth solar array. The array will be used as a retrofit preheater for a coal fired generating plant.

Mills, D.R.; Morrison, G.; Pye, J.; Le Lievre, P. [Solar Heat & Power SHP Pty. Ltd., Sydney, NSW (Australia)

2006-02-15T23:59:59.000Z

149

EIS-0413: EPA Notice of Availability of a Draft Environmental...  

Office of Environmental Management (EM)

EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the...

150

EA-1917: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment EA-1917: Draft Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates Northwest National Marine Renewable Energy...

151

EA-1861: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Draft Environmental Assessment EA-1861: Draft Environmental Assessment Frito-Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) is proposing to...

152

Department of Energy Issues Draft Renewable Energy and Efficient...  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Issues Draft Renewable Energy and Efficient Energy Projects Solicitation to Foster Clean Energy Innovation Department of Energy Issues Draft Renewable Energy...

153

EIS-0460: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of the Draft Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois The Environmental Protection Agency (EPA) announces the availability of the Draft EIS...

154

EA-1809: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment EA-1809: Draft Environmental Assessment White Earth Nation Wind Energy Project II Becker and Mahnomen Counties, MN This EA evaluates the potential...

155

EIS-0409: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of the Draft Environmental Impact Statement Kemper County Integrated Gasification Combined-Cycle (IGCC) Project, Mississippi Notice of Availability for the Draft...

156

EA-1923: Draft Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Draft Environmental Assessment EA-1923: Draft Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA...

157

EIS-0350: Draft Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement EIS-0350: Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

158

Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

DRAFT ENVIRONMENTAL IMPACT STATEMENT TABLE OF CONTENTS i TABLE OF CONTENTS 1. PURPOSE AND NEED FOR THE AGENCY ACTION...............................................................1-1 1.1 INTRODUCTION.....................................................................................................................1-1 1.2 FEDERAL ACTION .................................................................................................................1-1 1.3 PURPOSE AND NEED ............................................................................................................1-3 1.3.1 Purpose of Action.........................................................................................................1-3 1.3.2 Need for Action ............................................................................................................1-3

159

gla.its/its/Glasgow Mobile.rtf/2012-11-28/2.0 Glasgow Mobile -a strategy and project scope Draft Version 2.0  

E-Print Network [OSTI]

gla.its/its/Glasgow Mobile.rtf/2012-11-28/2.0 Glasgow Mobile - a strategy and project scope Draft Mobile - a strategy and scope Drew McConnell, Greg Sheridan and James Currall Version 2.0 March 2013 the majority of web access to content and services will be via mobile devices. Gartner analysts are very blunt

Glasgow, University of

160

Plains & Eastern Clean Line Project Proposal for New or Upgraded  

Broader source: Energy.gov (indexed) [DOE]

Plains & Eastern Clean Line Project Proposal for New or Upgraded Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) Update to Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (August 2011) More Documents & Publications EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland Involvement Notice of Intent To Prepare an Environmental Impact Statement for the

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

EIS-0421: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0421: Draft Environmental Impact Statement Big Eddy-Knight Transmission Project, Wasco County, OR and Klickitat County, WA BPA is considering three routing alternatives and a no action alternative for the proposed transmission line. The transmission line routing alternatives all would use a combination of existing BPA and new 150 foot wide right-of-way. The routing alternatives range from about 27 to 28 miles long. BPA is considering different tower combination options (single-circuit and double-circuit) including paralleling existing transmission lines. Two substation sites are being considered for the proposed Knight Substation; the sites are on adjacent properties along an existing BPA transmission line. Two fiber optic cable options are also

162

EA-1863: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1863: Draft Environmental Assessment Glen Canyon to Pinnacle Peak 345 kV Transmission Lines Vegetation Management Project within the Coconino National Forest Flagstaff, Arizona Comment Period Ends: 12/29/11 For more information, contact: Ms. Linette King Electronic mail: lking@wapa.gov The Glen Canyon to Pinnacle Peak 345 kV vegetation management and right-of-way maintenance project (Project) serves to update the existing operation and maintenance program to include all transmission facilities and access roads into one comprehensive and proactive vegetation management and right-of-way maintenance program (Program). This environmental assessment (EA) analyzes the potential environmental consequences of the proposed Project, as required under the National

163

EIS-0478: EPA Notice of Availability of a Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

8: EPA Notice of Availability of a Draft Environmental 8: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0478: EPA Notice of Availability of a Draft Environmental Impact Statement Antelope Valley Station to Neset Transmission Project EPA announces the availability of the Draft EIS for the Antelope Valley Station to Neset Transmission Project, prepared by the Rural Utility Service. This EIS evaluates the potential environmental impacts of constructing, operating, and maintaining a proposed transmission line and associated facilities in western North Dakota. DOE's Western Area Power Administration is a cooperating agency. EIS-0478-EPADEISNOA-2012.pdf More Documents & Publications EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0414: EPA Notice of Availability of the Draft Environmental Impact

164

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

165

EIS-0421: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

21: EPA Notice of Availability of the Draft Environmental 21: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28 mile long 500-Kilovolt Transmission Line using a Combination of Existing BPA and New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, Washington. Notice of Availability of Draft Environmental Impact Statement for the Big Eddy-Knight Transmission Project, DOE/EA-0421 (December 2010) 75 FR 76981 More Documents & Publications EIS-0449: Notice of Adoption of the Final Environmental Impact Statement EIS-0456: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0419: EPA Notice of Availability of the Draft Environmental Impact

166

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Broader source: Energy.gov (indexed) [DOE]

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

167

Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

DRAFT ENVIRONMENTAL IMPACT STATEMENT SUMMARY S-1 SUMMARY This environmental impact statement (EIS) has been prepared by the United States Department of Energy (DOE), in compliance with the National Environmental Policy Act of 1969 (NEPA) as amended (42 USC 4321 et seq.), to evaluate the potential environmental impacts associated with the construction and demonstration of a 98-megawatt (MWe) net power plant and cement manufacturing facility (the "Co- Production Facility"). The responsible organization for the federal action is the National Energy Technology Laboratory (NETL), a multi-purpose laboratory owned and operated by DOE. Proposed Action The Proposed Action is for DOE to decide whether to provide financial assistance to Western

168

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy Savers [EERE]

52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville...

169

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EIS-0447: DOE Notice of Availability of Draft Environmental Impact EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

170

EIS-0447: DOE Notice of Availability of Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Notice of Availability of Draft Environmental Impact DOE Notice of Availability of Draft Environmental Impact Statement EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York DOE announces the availability of a draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system from the Canadian Province of Quebec to New York City. This DOE notice of availability incorrectly identifies the close of the comment period as November 25, 2013. The correct date for the close of the comment period is December 16, 2013, which is reported in the Environmental Protection

171

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Broader source: Energy.gov (indexed) [DOE]

Imperial-Mexicali Imperial-Mexicali DEIS 1-4 May 2004 FIGURE 1.1-1 Regional Setting for Imperial-Mexicali 230-kV Transmission Lines Introduction Imperial-Mexicali DEIS 1-5 May 2004 FIGURE 1.1-2 La Rosita Power Complex: Electrical Distribution 2-40 May 2004 Alternatives Imperial-Mexicali DEIS TABLE 2.5-1 Summary of Impacts for Proposed Action and Other Alternatives by Resource Area a For the proposed action, that is, the granting of one or both of the Presidential permits and ROWs, for most resource areas, the analysis was bounded by calculating impacts as if both lines had been allowed. This serves two purposes. First, it demonstrates the maximum possible impacts; second, it clearly presents the combined impacts of the agencies' preferred alternative, that is, permitting both facilities. The only exceptions to this methodology are in the areas of air, water, and human health. Impacts to air, water, and human

172

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

173

Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statement for Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center A Summary and Guide for Stakeholders DOE/EIS-0226-D (Revised) November 2008 The West Valley Site Availability of the Revised Draft EIS for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center For further information on this Draft EIS, or to request a copy please contact: Cathern Bohan, EIS Document Manager West Valley Demonstration Project U.S. Department of Energy Ashford Office Complex 9030 Route 219 West Valley, NY 14171 Telephone: 716-942-4159 Fax: 716-942-4703 E-mail: catherine.m.bohan@wv.doe.gov Printed with soy ink on recycled paper

174

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

14: Draft Environmental Impact Statement 14: Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

175

EIS-0414: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, has applied to the U.S. Department of Energy (DOE) for a Presidential permit to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The EIS addresses the environmental impacts of the proposed transmission line and the range of reasonable alternatives. Five alternatives were identified in this EIS, three of which were carried forward for detailed analysis (the No Action Alternative, a Double-Circuit 230-kilovolt (kV) Transmission Line

176

EA-1855: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission line. The 54-mile long, wood pole line extends from the BPA Creston substation to the BPA Bell substation in Lincoln and Spokane Counties, Washington. The project would include replacing wood poles, associated structural components, and conductor, improvements to some existing access roads, construction of 10 miles of new access roads, and some vegetation removal. The rebuild would enable BPA to maintain reliable electric service and avoid risks to the public and worker safety. The line would continue to operate at 115-kV. EA-1855-DEA-2012-BPA-Creston-Bell.pdf More Documents & Publications

177

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Broader source: Energy.gov (indexed) [DOE]

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

178

EIS-0440: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0440: Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment (November 2011) Quartzsite Solar Energy proposes to construct a 100-megawatt solar-powered electrical generation facility in La Paz County, Arizona.The proposed project would use a solar field made up of heliostats, which are a collection of mirrors, a 653-foot tower to capture and concentrate the sun's heat to make steam, and a thermal energy storage system. Steam produced by the facility would power traditional steam turbine generators. The project is proposed for an area about 10 miles north of Quartzsite and adjacent to Arizona State Route 95. The generation plant, power line and

179

EIS-0450: Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0: Draft Environmental Impact Statement 0: Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. EIS-0450-DEIS-Volume1-2013.pdf EIS-0450-DEIS-Volume2-2013.pdf EIS-0450-DEIS-Volume3-2013.pdf EIS-0450-DEIS-Appendices_A-H-2013.pdf More Documents & Publications

180

Draft Environmental Assessment Ormat Nevada Northern Nevada Geothermal Power Plant Projects  

Broader source: Energy.gov (indexed) [DOE]

9 9 FINAL ENVIRONMENTAL ASSESSMENT Ormat Nevada Northern Nevada Geothermal Power Plant Projects Department of Energy Loan Guarantee for ORMAT LLC's Tuscarora Geothermal Power Plant, Elko County, Nevada; Jersey Valley Geothermal Project, Pershing County, Nevada; and McGinness Hills Geothermal Project, Lander County, Nevada U.S. Department of Energy Loan Guarantee Program Office Washington, D.C. 20585 August 2011 NORTHERN NEVADA GEOTHERMAL POWER PLANT PROJECTS - ORMAT NEVADA AUGUST 2011 FINAL ENVIRONMENTAL ASSESSMENT i TABLE OF CONTENTS 1.0 INTRODUCTION.................................................................................................................1 1.1 SUMMARY AND LOCATION OF PROPOSED ACTION .....................................................1

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EIS-0395: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio Colorado (SLRC) Power Center, interconnect with Western's existing Gila Substation, and continue to Arizona Public Service Company's (APS') North Gila Substation. The Proposed Project would require an expansion of Gila Substation and additional equipment at North Gila Substation; all of the proposed transmission components would be located in Yuma County, Arizona. Depending on the route ultimately selected, the total length of the 500-kV transmission system within the United States would be approximately 25.7 miles-21 miles from the United States-Mexico border to Gila Substation

182

Draft Environmental Assessment, Vermont Electric Power Company Proposed Northern Loop Project  

Broader source: Energy.gov (indexed) [DOE]

CONTENTS CONTENTS EXECUTIVE SUMMARY ............................................................Immediately after CONTENTS Chapter 1. PURPOSE AND NEED............................................................................................... 8 1.1. Introduction......................................................................................................................... 8 1.2 Project Summary................................................................................................................. 9 1.3 Purpose and Need ............................................................................................................. 17 1.3.1 Applicant's Purpose and Need..........................................................................................

183

Water Use Optimization Toolset Project: Development and Demonstration Phase Draft Report  

SciTech Connect (OSTI)

This report summarizes the results of the development and demonstration phase of the Water Use Optimization Toolset (WUOT) project. It identifies the objective and goals that guided the project, as well as demonstrating potential benefits that could be obtained by applying the WUOT in different geo-hydrologic systems across the United States. A major challenge facing conventional hydropower plants is to operate more efficiently while dealing with an increasingly uncertain water-constrained environment and complex electricity markets. The goal of this 3-year WUOT project, which is funded by the U.S. Department of Energy (DOE), is to improve water management, resulting in more energy, revenues, and grid services from available water, and to enhance environmental benefits from improved hydropower operations and planning while maintaining institutional water delivery requirements. The long-term goal is for the WUOT to be used by environmental analysts and deployed by hydropower schedulers and operators to assist in market, dispatch, and operational decisions.

Gasper, John R. [Argonne National Laboratory] [Argonne National Laboratory; Veselka, Thomas D. [Argonne National Laboratory] [Argonne National Laboratory; Mahalik, Matthew R. [Argonne National Laboratory] [Argonne National Laboratory; Hayse, John W. [Argonne National Laboratory] [Argonne National Laboratory; Saha, Samrat [Argonne National Laboratory] [Argonne National Laboratory; Wigmosta, Mark S. [PNNL] [PNNL; Voisin, Nathalie [PNNL] [PNNL; Rakowski, Cynthia [PNNL] [PNNL; Coleman, Andre [PNNL] [PNNL; Lowry, Thomas S. [SNL] [SNL

2014-05-19T23:59:59.000Z

184

EA-1931: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power...

185

Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico  

Broader source: Energy.gov (indexed) [DOE]

o o n c e p t u a l D r a w i n g of t h e C M R R F a c i l i t y Draft Environmental Impact Statement For the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico DOE/EIS-0350D May 2003 SUMMARY CMR Building TA-6 TA-55 U.S. Department of Energy National Nuclear Security Administration Los Alamos Site Office General questions regarding this EIS or for a copy of this EIS, please contact: AVAILABILITY OF THE DRAFT CMRR EIS Printed with soy ink on recycled paper Elizabeth Withers, EIS Document Manager U.S. Department of Energy Office of Los Alamos Site Operations 528 35th Street Los Alamos, New Mexico 87544-2201 Telephone: 1-877-491-4957 National Nuclear Security Administration iii COVER SHEET Responsible Agency: United States Department of Energy (DOE), National Nuclear Security

186

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy Savers [EERE]

line between Eugene and Florence, Oregon. Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryLane-Wendson...

187

ESPC ENABLE Draft Task Order  

Broader source: Energy.gov [DOE]

Document provides a draft for an agency to use when forming an ESPC ENABLE contract and making a task order award. This draft task order provides the framework for a contract that agencies and energy service companies can tailor to the particular needs of each site or project.

188

EIS-0487: Draft Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statement EIS-0487: Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission...

189

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

190

Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Figure S-1. Figure S-1. General Location Map U.S. Department of Energy National Energy Technology Lab Western Greenbrier Co-Production Demonstration Project DEIS November 2006 WV 20 S 12 S 63 WV 39 Proposed Co- Production Facility Anjean and Joe Knob Coal Refuse Piles U S 6 0 U S 6 0 US 219 WV 20 WV 39 AN1 AN2 AN3 DN1 DN2 GV W V 2 0 U S 6 0 C R 1 Figure 1-1. General Location Map U.S. Department of Energy National Energy Technology Lab Western Greenbrier Co-Production Demonstration Project DEIS November 2006 WV 20 S 12 S 63 WV 39 Proposed Co- Production Facility Anjean and Joe Knob Coal Refuse Piles U S 6 0 U S 6 0 US 219 WV 20 WV 39 AN1 AN2 AN3 DN1 DN2 GV W V 2 0 U S 6 0 C R 1 S 63 Rainelle Anjean Quinwood Charmco Lewisburg Savannah Quarry Greystone Quarry Boxley Quarry Anjean and Joe Knob Coal Refuse Piles Green Valley Coal Refuse Pile

191

EIS-0451: Supplemental Draft Environmental Impact Statement ...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho Bonneville Power Administration (BPA) BPA prepared a supplemental draft EIS to evaluate an additional...

192

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Broader source: Energy.gov (indexed) [DOE]

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

193

DRAFT --DRAFT --DRAFT --DRAFT --DRAFT --Esodyp+: Prefetching in the Jackal Software DSM  

E-Print Network [OSTI]

DRAFT -- DRAFT -- DRAFT -- DRAFT -- DRAFT -- Esodyp+: Prefetching in the Jackal Software DSM-based Distributed Shared Memory (DSM) systems and discuss its implementation. In contrast to page-based DSMs, an object-based DSM distributes data on the level of objects, rendering current prefetchers for page

Genaud, Stéphane

194

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Broader source: Energy.gov (indexed) [DOE]

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

195

DOE/EA-1485: Environmental Assessment for the Nisqually Transmission Line Relocation Project (January 2005)  

Broader source: Energy.gov (indexed) [DOE]

Nisqually Transmission Line Relocation Project Nisqually Transmission Line Relocation Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1485 Bonneville Power Administration January 2005 Nisqually Transmission Line Relocation Project Revision Sheet for Final Environmental Assessment 1 Revision Sheet for the Nisqually Transmission Line Relocation Project Final Environmental Assessment DOE/EA -1485 Summary This revision sheet documents the changes to be incorporated into the Nisqually Transmission Line Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On October 18, 2004, the Preliminary EA was sent to agencies and interested parties. Notification

196

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

197

EIS-0317: Kangley-Echo Lake Transmission Line Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

198

Draft Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Draft Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 Cover photos courtesy of (left to right): Southeast Renewable Fuels, LLC DOE National Renewable Energy Laboratory Public domain Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas Volume 2 - Appendices U.S. Department of Energy Golden Field Office Office of Energy Efficiency and Renewable Energy DOE/EIS-0407D September 2009 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) COOPERATING AGENCY: The U.S. Department of Agriculture-Rural Development is a cooperating

199

Draft Enivonmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Dear Reader: The enclosed Draft Environmental Assessment (EA) for the Utah Coal and Biomass Fueled Pilot Plant Project, Kanab, Utah , (Draft EA-1870D) was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). The Draft EA evaluates the potential environmental impacts of DOE providing cost-shared funding under a cooperative agreement with Viresco Energy, LLC (Viresco) for its design, construction, and testing of a pilot-scale gasification process facility. The objective of Viresco's proposed project is to conduct a pilot- scale evaluation of the Steam Hydrogasification Reaction process to determine the technical

200

Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 1, Summary  

SciTech Connect (OSTI)

The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western`s power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western`s firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action altemative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

Not Available

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EIS-0433-S1: Draft Supplemental Environmental Impact Statement | Department  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0433-S1: Draft Supplemental Environmental Impact Statement Keystone XL Project This EIS analyzes the potential environmental impacts of a revised proposal for the Keystone XL pipeline and related facilities. The proposed facilities would transport crude oil from the Western Canadian Sedimentary Basin and the Williston Basin to existing pipeline facilities near Steele City, Nebraska, for onward transport to markets in the Texas Gulf Coast area. DOE is a cooperating agency. DOE's Western Area Power Administration has jurisdiction over certain proposed transmission facilities relating to the proposal, including construction and operation of a portion of a 230-kilovolt transmission line and construction and operation of two new

202

EIS-0101: Thermopolis, Alcova, Casper Transmission Line Project  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this statement to evaluate the environmental impacts of constructing, operating and maintaining a 230-kilovolt transmission line between Thermopolis, Wyoming, and Alcova, Wyoming, and a 230/345-kilovolt transmission line between Alcova, Wyoming, and Casper, Wyoming.

203

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOEs Bonneville Power Administrations Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

204

EIS-0106: Great Falls-Conrad Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

205

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Broader source: Energy.gov (indexed) [DOE]

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

206

EIS-0457: EPA Notice of Availability of a Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Impact Statement EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0457: Albany-Eugene Rebuild Project, Lane and Linn Counties, OR This EIS evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild a 32-mile section of the Albany-Eugene 115-kilovolt No. 1 Transmission Line in Lane and Linn Counties, Oregon. Comment Period Ends: 03/05/12 Submit Comments to: Douglas Corkran Environmental Specialist Bonneville Power Administration - KEC-4 P.O. Box 3621 Portland, OR 97208-3621 Toll-free telephone: 800-282-3713 Direct telephone: 503-230-7646 Fax: 503-230-5699 Electronic mail: dfcorkran@bpa.gov EIS-0457-EPANOADEIS-2012.pdf More Documents & Publications EIS-0413: EPA Notice of Availability of a Draft Environmental Impact

207

EIS-0489: EPA Notice of Availability of Draft Environmental Impact...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Statement EIS-0489: EPA Notice of Availability of Draft Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project...

208

EIS-0489: FERC Notice of Availability of Draft Environmental...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

EIS-0489: FERC Notice of Availability of Draft Environmental Impact Statement Jordan Cove Liquefaction Project (Coos County, OR) and Pacific Connector Pipeline Project...

209

EIS-0474: EPA Notice of Availability of Draft Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Southline Transmission Project, Arizona and New Mexico EPA announces the availability of the Southline Transmission Project, (Arizona and New...

210

EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona  

Broader source: Energy.gov [DOE]

Draft EA: Comment Period Ends 12/23/2014Western Area Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of a 35.6-mile transmission line that Western operates and maintains under an agreement with the Central Arizona Project. Additional information is available on the project website, http://www.wapa.gov/dsw/environment/ED2DOEEA1972.htm.

211

EIS-0440: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

the Draft Environmental the Draft Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy Project Quartzsite Solar Energy proposes to construct a 100-megawatt solar-powered electrical generation facility in La Paz County, Arizona.The proposed project would use a solar field made up of heliostats, which are a collection of mirrors, a 653-foot tower to capture and concentrate the sun's heat to make steam, and a thermal energy storage system. Steam produced by the facility would power traditional steam turbine generators. The project is proposed for an area about 10 miles north of Quartzsite and adjacent to Arizona State Route 95. The generation plant, power line and ancillary facilities would be on land administered by the Bureau of Land

212

DOE/EIS-0357D-S1: Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project (12/26/06)  

Broader source: Energy.gov (indexed) [DOE]

EIS-0357D-S1 EIS-0357D-S1 SUPPLEMENT TO THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR THE GILBERTON COAL-TO-CLEAN FUELS AND POWER PROJECT GILBERTON, PENNSYLVANIA December 2006 U.S. DEPARTMENT OF ENERGY i COVER SHEET December 2006 RESPONSIBLE AGENCY U.S. Department of Energy (DOE) TITLE Supplement to the Draft Environmental Impact Statement for the Gilberton Coal -to-Clean Fuels and Power Project (DOE/EIS-0357D-S1) LOCATION Gilberton, Pennsylvania CONTACTS Additional copies or information concerning this Supplement to the Draft Environmental Impact Statement (EIS) can be obtained from Ms. Janice L. Bell, National Environmental Policy Act (NEPA) Document Manager, U.S. Department of Energy, National Energy Technology Laboratory, 626 Cochrans Mill Road, P.O. Box 10940, Pittsburgh, PA 15236-0940. Telephone: 412-386-4512.

213

DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project (DOE/EIS-0357D-S1)(01/16/07)  

Broader source: Energy.gov (indexed) [DOE]

0 Federal Register 0 Federal Register / Vol. 72, No. 9 / Tuesday, January 16, 2007 / Notices Dated: December 19, 2006. M. A. Harvison, Lieutenant Commander, Judge Advocate General's Corps, U.S. Navy, Federal Register Liaison Officer. [FR Doc. 07-115 Filed 1-12-07; 8:45 am] BILLING CODE 3810-FF-M DEPARTMENT OF ENERGY Notice of Availability of the Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to-Clean Fuels and Power Project AGENCY: Department of Energy. ACTION: Notice of availability. SUMMARY: The U.S. Department of Energy (DOE) announces the availability for public comment of a Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to- Clean Fuels and Power Project (DOE/ EIS-0357D-S1), prepared in response to comments on the original Draft

214

EIS-0124: Conrad-Shelby Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

215

EIS-0499: Great Northern Transmission Line Project, Minnesota  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 750-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.

216

Appendix D Draft Oil Spill Response Plan  

Broader source: Energy.gov (indexed) [DOE]

D D Draft Oil Spill Response Plan U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix D Draft Oil Spill Response Plan DRAFT Oil Spill Response Plan CAPE WIND ASSOCIATES, LLC BOSTON, MASSACHUSETTS PREPARED FOR Cape Wind Associates, LLC 75 Arlington Street Boston, Massachusetts 02116 PREPARED BY ESS Group, Inc. 401 Wampanoag Trail, Suite 400 East Providence, Rhode Island 02915 Project No. E159-601 December 2005 DRAFT OIL SPILL RESPONSE PLAN Cape Wind Associates, LLC Boston, Massachusetts Prepared For: Cape Wind Associates, LLC 75 Arlington Street Boston, Massachusetts 02116 Prepared By: ESS Group, Inc. 401 Wampanoag Trail, Suite 400

217

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

218

2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles  

E-Print Network [OSTI]

2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles Prof. Victor C become significant, especially in electric vehicles (EVs) of the future, which are highly sophisticated.M. Leung (vleung@ece.ubc.ca) 1. Project description In today's electric and conventional combustion engine

Leung, Victor C.M.

219

Notice of Availability of the Draft Environmental Assessment for the Proposed Infrastructure Improvements for the Yucca Mountain Project, Nevada (DOE/EA-1566) (July 6, 2006)  

Broader source: Energy.gov (indexed) [DOE]

391 Federal Register 391 Federal Register / Vol. 71, No. 129 / Thursday, July 6, 2006 / Notices disposal of government personal property. (5) Respondents: 176. (6) Estimated Number of Burden Hours: 3,960. Statutory Authority: Department of Energy Organization Act, Public Law 95-91. Issued in Washington, DC on June 28, 2006. Sharon A. Evelin, Director, Records Management Division, Office of the Chief Information Officer. [FR Doc. E6-10561 Filed 7-5-06; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY Notice of Availability of the Draft Environmental Assessment for the Proposed Infrastructure Improvements for the Yucca Mountain Project, Nevada AGENCY: U.S. Department of Energy. ACTION: Notice of Availability. SUMMARY: This notice announces the availability, and the opportunity for

220

Pauli graph and finite projective lines/geometries  

E-Print Network [OSTI]

The commutation relations between the generalized Pauli operators of N-qudits (i. e., N p-level quantum systems), and the structure of their maximal sets of commuting bases, follow a nice graph theoretical/geometrical pattern. One may identify vertices/points with the operators so that edges/lines join commuting pairs of them to form the so-called Pauli graph P_{p^N} . As per two-qubits (p = 2, N = 2) all basic properties and partitionings of this graph are embodied in the geometry of the symplectic generalized quadrangle of order two, W(2). The structure of the two-qutrit (p = 3, N = 2) graph is more involved; here it turns out more convenient to deal with its dual in order to see all the parallels with the two-qubit case and its surmised relation with the geometry of generalized quadrangle Q(4, 3), the dual of W(3). Finally, the generalized adjacency graph for multiple (N > 3) qubits/qutrits is shown to follow from symplectic polar spaces of order two/three. The relevance of these mathematical concepts to mutually unbiased bases and to quantum entanglement is also highlighted in some detail.

Michel R. P. Planat; Metod Saniga

2007-03-16T23:59:59.000Z

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Broader source: Energy.gov (indexed) [DOE]

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

222

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

223

Microsoft Word - N01673_B100 AA final draft  

Office of Legacy Management (LM)

Draft Building 100 Area Draft Building 100 Area Plume Management Alternatives Analysis March 2012 LMS/PIN/N01673 This page intentionally left blank LMS/PIN/N01673 Pinellas County, Florida, Site Environmental Restoration Project Draft Building 100 Area Plume Management Alternatives Analysis March 2012 This page intentionally left blank U.S. Department of Energy Draft Building 100 Area Plume Management Alternatives Analysis March 2012 Doc. No. N01673 Page i Contents Abbreviations ................................................................................................................................. iv Executive Summary .........................................................................................................................v

224

Microsoft Word - CHPE Public Draft EIS_Vol I_092713.docx  

Broader source: Energy.gov (indexed) [DOE]

WÜtyà WÜtyà Draft Champlain Hudson Power Express Transmission Line Project Environmental Impact Statement Volume I: Impact Analyses September 2013 U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY WASHINGTON, DC DOE/EIS-0447 COVER PHOTO CREDITS: 1. Lake Champlain at sunset obtained from Wikipedia.com 2. Cable-laying ship courtesy of CHPEI 3. Upper Hudson River Railroad obtained from sncrr.com 4. New York City skyline and new World Trade Center obtained from wtc.com 5. Project route courtesy of CHPEI 6. Hudson River courtesy of CHPEI 1 2 3 4 5 6 DRAFT CHAMPLAIN HUDSON POWER EXPRESS TRANSMISSION LINE PROJECT ENVIRONMENTAL IMPACT STATEMENT Volume I: Impact Analyses U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY

225

EA-1972: Draft Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assessment EA-1972: Draft Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power Administration issued...

226

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

227

EIS-0284: Draft Environmental Impact Statement | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Impact Statement EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits electronic...

228

EIS-0284: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental Impact Statement Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric...

229

EA-1903: Notice of Availability of Draft Environmental Assessment...  

Energy Savers [EERE]

of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office announces the availablity of...

230

EIS-0413: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

Impact Statement EIS-0413: Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV The Department of the Interior's Bureau of Land...

231

EIS-0445: Draft Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Statement EIS-0445: Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia This EIS evaluates the...

232

EIS-0439: Draft Environmental Impact Statement | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an Application...

233

EIS-0439: DOE Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western Area Power Administration (Western) and...

234

EIS-0383: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental Impact Statement Orlando Gasification Project To Provide Cost-Shared Funding for Construction and Operation of Facilities...

235

EIS-0487: EPA Notice of Availability of Draft Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0487: EPA Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas EPA announces the availability of the...

236

EIS-0487: Notice of Availability of Draft Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0487: Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission...

237

EIS-0464: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County,...

238

EIS-0397: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental Impact Statement Lyle Falls Fish Passage Project To Improve Fish Passage to Habitat in the Upper Part of the Watershed,...

239

EA-1611-S1: Draft Supplemental Environmental Assessment | Department...  

Broader source: Energy.gov (indexed) [DOE]

Supplemental Environmental Assessment Colorado Highlands Wind Project, Logan County, Colorado DOE's Western Area Power Administration issued a draft supplemental EA that...

240

EA-1969: Draft Environmental Assessment | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Assessment Clark Fork River Delta Restoration Project, Bonner County, Idaho Bonneville Power Administration issued a draft EA that analyzes the potential effects of a proposal to...

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

EA-1945: Draft Environmental Assessment | Department of Energy  

Office of Environmental Management (EM)

Northern Mid-Columbia Joint Project, Douglas and Chelan Counties, Washington Bonneville Power Administration (BPA) issued a Draft EA that assesses the potential environmental...

242

EIS-0425: EPA Notice of Availability of Draft Environmental Impact...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA...

243

EA-1566: DOE Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of the Draft Environmental Assessment Proposed Infrastructure Improvements for the Yucca Mountain Project, Nevada This notice announces the availability, and the opportunity...

244

EA-1809: Notice of Availability of a Draft Environmental Assessment...  

Broader source: Energy.gov (indexed) [DOE]

Assessment EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen Counties, MN DOE announces...

245

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

246

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register  

Broader source: Energy.gov [DOE]

The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

247

Sacramento Area Voltage Support Draft Environmental Impact Statement  

SciTech Connect (OSTI)

The Western Area Power Administration's Central Valley Project transmission system forms an integral part of the interconnected Sacramento area transmission grid. Western is contractually responsible to oversee that the system is operated in accordance with strict reliability standards. Growth in the greater Sacramento, California area and power imported from generation outside the region, have increased the demand on the interconnected electric transmission system, leading to transmission system overloads and reducing the reliability and security of the area power system. Western has prepared this Sacramento Area Voltage Support (SVS) Draft Environmental Impact Statement (EIS) in compliance with Federal laws, regulations and guidelines, principally the ''National Environmental Policy Act'' (NEPA). This Draft EIS evaluates the potential environmental effects of physical improvements to the area's power system. Enhancements are needed to improve system reliability and provide voltage support for the Sacramento area. The results of public scoping meetings, workshops, meetings with agencies, and earlier studies by Western and area utilities helped to develop a range of alternatives for analysis. The Proposed Action involves: Constructing a new double-circuit, 230-kV transmission line paralleling the existing double-circuit, 230-kV line from the O'Banion Substation to the Elverta Substation; Realigning a portion of the existing Cottonwood-Roseville single-circuit, 230-kV transmission line north of Elverta Substation; and Reconductoring the existing double-circuit, 230-kV transmission line from the Elverta Substation to the Tracy Substation. Public Hearings on the Draft EIS will be held between December 9-12, 2002. Comments on this Draft EIS are encouraged and should be sent to Ms. Loreen McMahon (above). Comments must be received by December 30, 2002.

N /A

2002-11-15T23:59:59.000Z

248

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

249

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Broader source: Energy.gov (indexed) [DOE]

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

250

Design and Drafting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Email Portal (Zimbra)* Email Portal (Zimbra)* * Operations Logbook* * Project Proposal System* * ICMS * Safety and Training * ANL ESQ Training * APS Phone Directory * Resources & Information* * Internal link Design and Drafting Group The Advanced Photon Source (APS) at Argonne National Laboratory is a national synchrotron-radiation research facility funded by the U.S. Department of Energy. Using high-brilliance x-ray beams from the APS, an international community of scientists conducts forefront basic and applied research in the fields of material science, biological science, physics, chemistry, environmental, geophysical and planetary science. The AES Design and Drafting Group supports the ASD and AES divisions' continued improvement of the accelerator as well as the scientific

251

California Energy Commission STAFF DRAFT REPORT  

E-Print Network [OSTI]

California Energy Commission STAFF DRAFT REPORT RENEWABLES PORTFOLIO STANDARD 20082010 ENERGY COMMISSION Gina Barkalow Theresa Daniels James Haile Primary Authors Gina Barkalow Project Manager with contributions from the following: California Energy Commission Gabe Herrera Mark Kootstra Michael Nyberg

252

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Broader source: Energy.gov [DOE]

The USDA Rural Utilities Service, with DOEs Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1).)

253

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley  

E-Print Network [OSTI]

?unintentional?vandalism,?and?normal?irrigation?district?operational?and?maintenance? activities.??Each?project?was?evaluated?using?a?visual?inspection?process?during?which? performance/condition?ratings?were?assigned.? ? Without?question,?the?best?lining?system?is?a?synthetic?liner?with?a?protective?barrier?of? shotcrete.??The?synthetic?liner?significantly?reduces?seepage,?while?the?shotcrete?protects...?it? from?damage.??This?lining?system?needs?little?to?no?maintenance.??There?were?two?types?of? liners?used:?PVC?and?polyester.??Each?performed?equally?as?well.? ? The?performance?of?synthetic?liners?without?a?protective...

Karimov, Askar; Leigh, Eric; Fipps, Guy

254

Responses to Public Comments on Draft Vitrification Melter Evaluation  

Broader source: Energy.gov (indexed) [DOE]

Comments on Draft WVDP Vitrification Melter WIR Evaluation Comments on Draft WVDP Vitrification Melter WIR Evaluation 1 To provide greater transparency to the Department of Energy's (DOE) cleanup of nuclear legacy waste, DOE made the "West Valley Demonstration Project Draft Waste Incidental to Reprocessing Evaluation for the Vitrification Melter" (Draft WIR Evaluation) available for public and state review and comment and Nuclear Regulatory Commission (NRC) consultation review. The public comments on the Draft WIR Evaluation were submitted to DOE by one individual and two organizations:  Raymond C. Vaughan, PhD.,  The West Valley Citizen Task Force, and  The Coalition on West Valley Nuclear Wastes.

255

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Broader source: Energy.gov (indexed) [DOE]

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

256

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

257

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Westerns project website.

258

Project Overview  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Questions Keeler-Pennwalt Wood Pole Removal Line Projects Line Rebuild, Relocation and Substation Projects Spacer Damper Replacement Program Wind Projects Project Overview BPA...

259

Design and Drafting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Design & Drafting Work Request Form Design & Drafting Work Request Form Please complete and submit the following form to request service from the AES/D&D Group Please fill out this form as complete as possible. Please do not use any special characters such as / or \ use a dash -. Project Name: Project Division is for: AES ASD XSD BEAMLINE APS APS-Upgrade LCLS NSLS-II Specify the APS Division the Project will be built for. WBS: Requesting Engineer: Last Name First Name Requesters Badge Number: Requesters Phone: E-mail: @aps.anl.gov Requesters Group: AES-ADM AES-BC AES-BSC AES-CF AES-CS AES-CTL AES-DD AES-IS AES-IT AES-MED AES-MIS AES-MOM AES-PRO AES-SA AES-SI AES-UES ASD-ADM ASD-AP ASD-DIA ASD-IAG ASD-MD ASD-OA ASD-PS ASD-RF LCLS USR-APS XSD-ADM XSD-BTS XSD-CEP XSD-IXN XSD-MC XSD-MM XSD-OFM XSD-TRR XSD-UAS XSD-XMI XSD-XOR

260

EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire,  

Broader source: Energy.gov (indexed) [DOE]

Midway-Benton No. 1 Rebuild Project, near town of Desert Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA This EA evaluates the environmental impacts of a proposal by DOE's Bonneville Power Administration to rebuild its existing Midway-Benton No.1 transmission line in place, or to reroute a portion of the Midway-Benton No. 1 transmission line that currently crosses Gable Mountain and Gable Butte in order to avoid crossing these features. Please note: Together, the Draft EA and the Revision to the Draft EA constitute the Final EA. EA-1912-DEA-2012.pdf EA-1912-RevisedDEA-2012.pdf More Documents & Publications EA-1912: Draft Environmental Assessment

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Selected Area Fishery Evaluation Project Economic Analysis Study Final Report, Final Draft Revision 4: November 10, 2006.  

SciTech Connect (OSTI)

The purpose of this Study is to provide an economic review of current and proposed changes to the Select Area Fishery Evaluation Project (SAFE or Project). The Study results are the information requested in comments made on the Project by a joint review dated March 2005 by the Northwest Power and Conservation Council (NPCC) Independent Scientific Review Panel (ISRP) and Independent Economic Analysis Board (IEAB). North et al. (2006) addressed technical questions about operations and plans, and this report contains the response information for comments concerning Project economics. This report can be considered an economic feasibility review meeting guidelines for cost-effective analysis developed by the IEAB (2003). It also contains other economic measurement descriptions to illustrate the economic effects of SAFE. The SAFE is an expansion of a hatchery project (locally called the Clatsop Economic Development Council Fisheries Project or CEDC) started in 1977 that released an early run coho (COH) stock into the Youngs River. The Youngs River entrance to the Columbia River at River Mile 12 is called Youngs Bay, which is located near Astoria, Oregon. The purpose of the hatchery project was to provide increased fishing opportunities for the in-river commercial fishing gillnet fleet. Instead of just releasing fish at the hatchery, a small scale net pen acclimation project in Youngs Bay was tried in 1987. Hirose et al. (1998) found that 1991-1992 COH broodstock over-wintered at the net pens had double the smolt-to-adult return rate (SAR) of traditional hatchery release, less than one percent stray rates, and 99 percent fishery harvests. It was surmised that smolts from other Columbia River hatcheries could be hauled to the net pens for acclimation and release to take advantage of the SAR's and fishing rates. Proposals were tendered to Bonneville Power Administration (BPA) and other agencies to fund the expansion for using other hatcheries smolts and other off-channel release sites. The BPA, who had been providing funds to the Project since 1982, greatly increased their financial participation for the experimental expansion of the net pen operations in 1993. Instead of just being a funding partner in CEDC operations, the BPA became a major financing source for other hatchery production operations. The BPA has viewed the 10 plus years of funding since then as an explorative project with two phases: a 'research' phase ending in 1993, and a 'development' phase ending in 2006. The next phase is referred to in proposals to BPA for continued funding as an 'establishment' phase to be started in 2007. There are three components of SAFE: (1) The CEDC owns and operates the net pens in the Columbia River estuary on the Oregon side. The CEDC also owns and operates a hatchery on the South Fork Klaskanine River. (2) There are many other hatcheries contributing smolts to the net pen operations. The present suite of hatcheries are operated by the Washington Department of Fish and Wildlife (WDFW) and Oregon Department of Fish and Wildlife (ODFW). The WDFW owns and operates the net pens at Deep River on the Washington side of the Columbia River. (3) The monitoring and evaluation (M&E) responsibilities are performed by employees of WDFW and ODFW. BPA provides funding for all three components as part of NPCC Project No. 199306000. The CEDC and other contributing hatcheries have other sources of funds that also support the SAFE. BPA's minor share (less than 10 percent) of CEDC funding in 1982 grew to about 55 percent in 1993 with the beginning of the development phase of the Project. The balance of the CEDC budget over the years has been from other federal, state, and local government programs. It has also included a 10 percent fee assessment (five percent of ex-vessel value received by harvesters plus five percent of purchase value made by processors) on harvests that take place in off-channel locations near the release sites. The CEDC total annual budget in the last several years has been in the $600 to $700 thousand range. The Project over

Bonneville Power Administration; Washington Department of Fish and Wildlife; Oregon Department of Fish and Wildlife

2006-11-01T23:59:59.000Z

262

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Broader source: Energy.gov (indexed) [DOE]

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

263

EIS-0365: EPA Notice of Availability of the Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines Imperial-Mexicali 230-kV Transmission Lines, Construct a Double-Circuit 230-kV...

264

Liberty-Parker No. 2 230-kV transmission line project, La Paz and Maricopa Counties, Arizona: Environmental assessment  

SciTech Connect (OSTI)

The proposed project was not found to have the potential for significant impact on the human environment. The proposed project is essentially a rebuild of an existing transmission line on an existing right-of-way (ROW) through mostly unpopulated open desert. Analysis of the proposed action and its potential effects on various environmental components showed that the project would not significantly affect climate, air quality, noise levels, topography, geology, or soils. No significant impact would occur to vegetation or wildlife as a result of the project. Visual resources will not be significantly affected, as both the existing Liberty-Parker No. 2 Transmission Line and its parallel sister No. 1 line are already present. Land ownership, land use, and socioeconomics will not be significantly affected. No significant cultural resources will be affected by the proposed project. The lines will be constructed on areas previously surveyed for cultural resources and the site density of this region is known to be very low.

Not Available

1986-09-01T23:59:59.000Z

265

Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)  

SciTech Connect (OSTI)

This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

None

1992-09-18T23:59:59.000Z

266

DOE/EA-1697 Draft Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment for Right-of-Way Maintenance in the San Joaquin Valley, California June 2010 Prepared for: Western Area Power Administration, Sierra Nevada Region San Joaquin Valley ROW Maintenance EA June 2010 iii Draft EA CONTENTS 1.0 PURPOSE AND NEED FOR ACTION ...................................................................... 1-1 1.1 Introduction ............................................................................................. 1-1 1.2 Background ............................................................................................. 1-1 1.3 Purpose and Need for Action .................................................................. 1-3 1.4 Location and Project Area Description .................................................... 1-4

267

Microsoft Word - NEPA_CX_FINAL_Lancaster_Line_and_Load_Project_06-15-2012.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2012 8, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Project Manager - TEP-TPP-1 Proposed Action: Lancaster Line and Load Project - LO311 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities B4.7 Fiber optic cable Location: Lancaster Substation, Kootenai County, Idaho; approximately 2.2 miles southwest of Rathdrum, Idaho, (Township 51 North, Range 5 West, Section 11). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to add equipment to its existing Lancaster Substation, replace one transmission structure, modify one existing structure, and replace existing

268

Draft Environmental Impact Statement Available for Public Review |  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review Draft Environmental Impact Statement Available for Public Review November 25, 2008 - 4:58pm Addthis Washington, D.C. - The U.S. Department of Energy (DOE) today announced the issuance of the Draft Environmental Impact Statement (EIS) for the West Valley Demonstration Project in western New York, naming Phased Decisionmaking as the Preferred Alternative. Issuance of this Draft EIS is a significant step forward in cleaning up the site. The document, entitled "Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center (DOE/EIS-0226-D (Revised)), is a revision of the 1996 Cleanup and Closure

269

EIS-0450: EPA Notice of Availability of Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EPA announces the availability of the Draft EIS for the TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's Western Area Power Administration, joint lead agencies for the environmental review, also announce the availability of the Draft EIS. EIS-0450-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0464: EPA Notice of Availability of Final Environmental Impact

270

EA-1792: DOE Notice of Availability of the Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Assessment EA-1792: DOE Notice of Availability of the Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This draft EA to evaluate and describe the potential environmental impacts associated with the: University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine. Notice of Availability of the Draft Environmental Assessment for the University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project Gulf of Maine, DOE/EA-1792 (June 2011) More Documents & Publications EA-1792: DOE Notice of Availability of the Environmental Assessment and Finding of No Significant Impact

271

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley of Texas: 2011 Ratings and Analysis  

E-Print Network [OSTI]

changes using a lining evaluation form which we developed. For analysis purposes, we grouped all the projects into two general categories: liners with a protective barrier, and liners without a protective barrier. The projects with a protective... barrier performed very well. The synthetic liner significantly reduces seepage, while the shotcrete layer protects the liner from damage. This lining system needs little to no maintenance. There were two types of liners used: PVC and polyester. Each...

Bonaiti, Gabriele; Karimov, Askar; Fipps, Guy

272

Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16  

SciTech Connect (OSTI)

The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

Not Available

1994-02-01T23:59:59.000Z

273

Draft 2014 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013...

274

Biomass 2014 Draft Agenda | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Biomass 2014 Draft Agenda Biomass 2014 Draft Agenda The following document is a draft agenda for the Biomass 2014: Growing the Future Bioeconomy conference. Biomass 2014 Draft...

275

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

SciTech Connect (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

276

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

277

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

SciTech Connect (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

278

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

279

Chapter 3_Consolidated_DRAFT  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement March 2013 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Volume 1: Environmental Analyses DOE/EIS-0451 HOOPER SPRINGS TRANSMISSION PROJECT Draft Environmental Impact Statement DOE/EIS - 0451 Bonneville Power Administration Cooperating Agencies U.S. Department of Agriculture, Forest Service, Caribou-Targhee National Forest U.S. Department of Interior, Bureau of Land Management Idaho Office of Energy Resources March 2013 Hooper Springs Transmission Project Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Cooperating Agencies: U.S. Department of Agriculture, Forest Service (USFS), Caribou-Targhee National Forest (C-TNF); U.S. Department of Interior, Bureau of Land Management (BLM); Idaho Office of Energy Resources

280

Draft-O-Meter  

K-12 Energy Lesson Plans and Activities Web site (EERE)

Students will learn an easy technique to measure the presence of drafts in their homes and classrooms.

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EIS-0377: Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Notice of Availability of the Draft Environmental Impact Notice of Availability of the Draft Environmental Impact Statement EIS-0377: Notice of Availability of the Draft Environmental Impact Statement Western Area Power Administration Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western) announces the availability of the Supplemental Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement for public review and comment. Western Area Power Administration Big Stone II Power Plant and Transmission Project Supplemental Draft Environmental Impact Statement (DOE/EIS-0377) (72FR60843)(October 26, 2007) More Documents & Publications EIS-0377: DOE Notice of Availability of the Final Environmental Impact Statement EIS-0183: Notice of Extension of Scoping Period

282

Final Draft ENVIRONMENTAL ASSESSMENT  

E-Print Network [OSTI]

the anticipated completion of the Constellation Programmatic Environmental Impact Statement in June 2008Final Draft ENVIRONMENTAL ASSESSMENT FOR THE CONSTRUCTION, MODIFICATION, AND OPERATION OF THREE CENTER, FL 32899 February 2007 #12;THIS PAGE INTENTIONALLY LEFT BLANK #12;FINAL DRAFT DRAFT ENVIRONMENTAL

Waliser, Duane E.

283

EIS-0231: Navajo Transmission Project | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

31: Navajo Transmission Project 31: Navajo Transmission Project EIS-0231: Navajo Transmission Project SUMMARY This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV) transmission line planned to deliver electric power from the Four Comers area in northwestern New Mexico across northern Arizona to a terminus in southeastern Nevada. The proposed project, the Navajo Transmission Project, is currentiy planned to be in service in the year 2001 and operate for about 50 years. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD September 1, 1996 EIS-0231: Draft Environmental Impact Statement Draft Environmental Impact Statement Navajo Transmission Project

284

EA-1705: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1705: Draft Environmental Assessment Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan The frontier Project consists of the design, construction and operation of a biorefinery producing ethanol and other co-products from cellulosic materials utilizing a proprietary pretreatment and fermentation process. Draft Environmental Assessment and Notice of Wetland Involvement for the Construction and Operation of a Proposed Cellulosic Biorefinery, Mascoma Corporation, Kinross Charter Township, Michigan, DOE/EA-1705 (February 2011) More Documents & Publications EA-1705: Final Environmental Assessment EA-1705: Finding of No Significant Impact Pacific Ethanol, Inc

285

EIS-0349: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0349: Draft Environmental Impact Statement BP Cherry Point Cogeneration Project BP West Coast Products, LLC proposes to construct and operate a 720-megawatt, natural-gas-fired, combined-cycle cogeneration facility on land adjacent to its BP Cherry Point Refinery. Approximately 195 acres of undeveloped land would be converted for the cogeneration facility; gas, water, wastewater, and steam pipelines; construction laydown areas; access roads; and wetland mitigation areas.This Draft EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic benefits of the proposed action, and identifies mitigation measures to compensate for the unavoidable impacts. Alternative

286

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

287

Appendix C Draft Stormwater Pollution Prevention Plan  

Broader source: Energy.gov (indexed) [DOE]

C C Draft Stormwater Pollution Prevention Plan U.S. Department of the Interior Minerals Management Service MMS Cape Wind Energy Project January 2009 Final EIS Appendix C Draft Stormwater Pollution Prevention Plan Cover with Template.doc DRAFT Stormwater Pollution Prevention Plan CAPE WIND ENERGY PROJECT BARNSTABLE AND YARMOUTH, MASSACHUSETTS PREPARED FOR Cape Wind Associates, LLC 75 Arlington Street, Suite 704 Boston, MA 02116 PREPARED BY ESS Group, Inc. 888 Worcester Street, Suite 240 Wellesley, Massachusetts 02482 Project No. E159-000 November 29, 2006 ESS Group, Inc. © 2006 - This document or any part may not be reproduced or transmitted in any form or by any means, electronic, or mechanical, including photocopying, microfilming, and recording without the express written consent of ESS Group,

288

EIS-0361: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, West Virginia Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (71FR69562) (12/01/06) More Documents & Publications EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement

289

EIS-0383: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding for construction and operation of facilities at Orlando Utilities Commission's (OUC's) existing Stanton Energy Center near Orlando, Florida. The project has been selected for further consideration by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC) technology. Although DOE funding would support only the Orlando Gasification Project (i.e., coal gasifier, synthesis gas cleanup systems, and supporting infrastructure),

290

The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata  

SciTech Connect (OSTI)

The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

2009-09-01T23:59:59.000Z

291

The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata  

SciTech Connect (OSTI)

The Genomes On Line Database (GOLD) is a comprehensive resource of information for genome and metagenome projects world-wide. GOLD provides access to complete and ongoing projects and their associated metadata through pre-computed lists and a search page. The database currently incorporates information for more than 2900 sequencing projects, of which 639 have been completed and the data deposited in the public databases. GOLD is constantly expanding to provide metadata information related to the project and the organism and is compliant with the Minimum Information about a Genome Sequence (MIGS) specifications.

Fenner, Marsha W; Liolios, Konstantinos; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Kyrpides, Nikos C.

2007-12-31T23:59:59.000Z

292

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

293

Draft Supplemental Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

Al Al b any, OR * Mo rg antow n , WV * Pitt, bu rg h , PA August 12, 20 II Dear Reader: The enclosed document, Draft Supplemental Environmental Assessment for General Motors LLC Electric Drive Vehicle Battery and Component Manufacturing Initiative (supplemental EA; DOElEA- I 723S), was prepared by the U.S. Department of Energy (DOE) in accordance with the Council on Environmental Quality's National Environmental Policy Act (NEPA) implementing regulations (40 CFR Parts 1500 to 1508) and DOE NEPA implementing procedures (10 CFR Part 1021). DOE prepared this supplemental EA to evaluate the potential environmental consequences of providing financial assistance under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. liS) to General Motors Limited Liability Company (GM) for its proposed project

294

EA-1916: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1916: Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 On September 1, 2011, Ocean Renewable Power Company Maine, LLC (ORPC Maine) filed an application for an 8-year pilot license to construct and operate its proposed Cobscook Bay Tidal Energy Project (Cobscook Bay Project or project). The 300-kilowatt (kW) hydrokinetic project would be located in Cobscook Bay in Washington County, Maine. The project would not be located on federal lands. The proposed Cobscook Bay Project would use the tidal currents of Cobscook Bay to generate electricity via cross-flow Kinetic System turbine generator units (TGU) mounted on the seafloor. The TGUs would capture

295

EIS-0442: EPA Notice of Availability of Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2: EPA Notice of Availability of Draft Environmental Impact 2: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0442: EPA Notice of Availability of Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah EPA announces the availability of the Draft Environmental Impact Statement for the Reauthorization of Permits, Maintenance and Vegetation Management Along Existing Western Area Power Administration Transmission Line Rights of Way on National Forest System Lands, Colorado, Utah, and Nebraska. EIS-0442-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0389: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental

296

EIS-0442: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement EIS-0442: Draft Environmental Impact Statement Reauthorization of Permits, Maintenance, and Vegetation Management on Western Area Power Administration Transmission Lines on Forest Service Lands, Colorado, Nebraska, and Utah This Draft EIS is being prepared jointly by DOE's Western Area Power Administration and the U.S. Forest Service. It evaluates the potential environmental impacts of Western's proposed changes to vegetation management along its transmission line rights-of-way on National Forest System lands in Colorado, Utah, and Nebraska. The EIS website is http://ww2.wapa.gov/sites/western/transmission/infrastruct/Pages/Western%20FS%20EIS.aspx EIS-0442: Draft Environmental Impact Statement More Documents & Publications

297

EIS-0357-S1: Supplement to the Draft Environmental Impact Statement...  

Broader source: Energy.gov (indexed) [DOE]

EIS-0357-S1: Supplement to the Draft Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project, Gilberton, Pennsylvania The Department of Energy has prepared...

298

EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental...  

Broader source: Energy.gov (indexed) [DOE]

the Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National...

299

U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Draft Environmental Impact Statement DOE/EIS-0290-D  

Broader source: Energy.gov (indexed) [DOE]

B-1 B-1 APPENDIX B FACILITY DESCRIPTION INFORMATION The following descriptions are taken from BNFL-5232-RCRA-01, Rev. 0, Hazardous Waste Management Act/Toxic Substances Control Act (HWMA/TSCA) permit application for the Advanced Mixed Waste Treatment Project (AMWTP) facility. B-1 Nonthermal Treatment Operations Waste containers within the nonthermal treatment areas are managed in a manner to prevent container rupture or leakage and to minimize exposure of AMWTP facility personnel. Operating standards used in conducting nonthermal treatment activities include: * Wastes slated for direct supercompaction have been identified by item description codes, generator- supplied information, and real-time radiography examination. Other wastes for supercompaction and macroencapsulation are sorted, segregated, and size reduced in the pretreatment lines prior to

300

Energy Department Releases Draft Advanced Fossil Energy Solicitation to  

Broader source: Energy.gov (indexed) [DOE]

Releases Draft Advanced Fossil Energy Releases Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas Pollution Energy Department Releases Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas Pollution July 2, 2013 - 12:42pm Addthis NEWS MEDIA CONTACT (202) 586-4940 Washington, D.C. - As part of President Obama's Climate Action Plan, the U.S. Department of Energy announced today a draft loan guarantee solicitation for innovative and advanced fossil energy projects and facilities that substantially reduce greenhouse gas and other air pollution. The Advanced Fossil Energy Projects solicitation, authorized by Title XVII of the Energy Policy Act of 2005 through Section 1703 of the Loan Guarantee Program, does just that. The draft solicitation will be open

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EA-1814: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1814: Draft Environmental Assessment City of Montpelier Combined Heat and Power and District Energy System, Montpelier, Vermont The U.S. Department of Energy (DOE) is proposing to provide Federal funding through the Community Renewable Energy Deployment Program to the City of Montpelier for the design, permitting, and construction of a combined heat and power (CHP) and district energy system. This Draft EA analyzes the foreseeable environmental impacts of the proposed project and the alternative of not implementing this project (the No-Action Alternative), including the construction of a new heat plant and district energy system within a 100 year floodplain. Draft Environmental Assessment for City of Montpelier Combined Heat and

302

EIS-0431: EPA Notice of Availability of Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EPA Notice of Availability of Draft Environmental Impact EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA EPA announces the availability of the Draft Environmental Impact Statement for the Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA for public review and comment. EIS-0431-DEIS-EPANOA-2013.pdf More Documents & Publications EIS-0400: EPA Notice of Availability of Final Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0460: EPA Notice of Availability of Final Environmental Impact

303

EIS-0450: EPA Notice of Availability of Draft Environmental Impact...  

Energy Savers [EERE]

Statement TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EPA announces the availability of the Draft EIS for the TransWest...

304

EIS-0473: EPA Notice of Availability of a Draft Environmental...  

Broader source: Energy.gov (indexed) [DOE]

of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX EPA announces the availability...

305

DRAFT OUTLINE  

Broader source: Energy.gov (indexed) [DOE]

DOE/E A - 1884 Yuma County, Colorado U. S. Department of Energy Western Area Power Administration December 2012 Wray Wind Energy Project Environmental Assessment For DOE/E A - 1884 Yuma County, Colorado U. S. Department of Energy Western Area Power Administration December 2012 THIS P AGE INTENTIONALLY BLAN K Table of Contents Table of Contents i W ray W ind Energy Project EA TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................................ 1 -1 1.1 BACKG RO UND .................................................................................................................................1.1-1 1.2 PURPOS E AND NEED ........................................................................................................................1.2-1

306

EPA Notice of Availability of the Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (02/08)  

Broader source: Energy.gov (indexed) [DOE]

9 Federal Register 9 Federal Register / Vol. 73, No. 32 / Friday, February 15, 2008 / Notices counties, UT, Montrose County, CO, and Uinta County, WY. Summary: EPA has environmental concerns about potential water quality impacts and recommends that the final EIS evaluate and compare the environmental impacts by alternative, of removing interim protections from the 86 eligible stream segments. Rating EC1. Final EISs EIS No. 20070530, ERP No. F-COE- E39071-00, Wolf Creek Dam/Lake Cumberland Project, Emergency Measures in Response to Seepage, Mississippi River, South Central Kentucky and Central Tennessee. Summary: EPA continues to have environmental concerns about water quantity and water quality impacts. EIS No. 20070556, ERP No. F-NGB- E11062-MS, Camp Shelby Joint Force

307

OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

On December 21, 2012, DOEs Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

308

Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM (DOE/EIS-0350)(5/15/03)  

Broader source: Energy.gov (indexed) [DOE]

96 96 Federal Register / Vol. 68, No. 94 / Thursday, May 15, 2003 / Notices [FR Doc. 03-12161 Filed 5-14-03; 8:45 am] BILLING CODE 6450-01-P DEPARTMENT OF ENERGY National Nuclear Security Administration Notice of Availability of the Draft Environmental Impact Statement for the Proposed Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM AGENCY: U.S. Department of Energy, National Nuclear Security Administration. ACTION: Notice of availability and public hearings. SUMMARY: Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended (42 U.S.C. 4321 et seq.), and the DOE Regulations Implementing NEPA (10 CFR part 1021), the National Nuclear Security Administration (NNSA), an agency

309

DOE/EA-1635: Environmental Assessment for Pre-approval Review Williston to Tioga Transmission Line Project (March 2010)  

Broader source: Energy.gov (indexed) [DOE]

Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 March 2010 Acronyms and Abbreviations °C degrees Celsius AAQS Ambient Air Quality Standards AIRFA American Indian Religious Freedom Act of 1978 amsl above mean sea level APLIC Avian Power Line Interaction Committee BEPC Basin Electric Power Cooperative BFE Base Flood Elevation BGEPA Bald and Golden Eagle Protection Act BMP best management practice CFR Code of Federal Regulations CO 2 carbon dioxide Council Advisory Council on Historic Preservation CRP Conservation Reserve Program

310

EIS-0346: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

6: EPA Notice of Availability of the Draft Environmental 6: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington DOE/EIS-0346, Notice of Availability of Draft EIS, Environmental Protection Agency, Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington, 69 FR 53916 (September 2004)

311

EA-1806: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6: Draft Environmental Assessment 6: Draft Environmental Assessment EA-1806: Draft Environmental Assessment Libman Company Wind Energy Project Arcola, Douglas County, Illinois The U.S. Department of Energy (DOE) has provided a grant to the State of Illinois and is proposing to authorize the expenditure of Federal funding to design, permit, and construct the Libman Wind Energy Project, a proposed 1.5 megawatt (MW) wind turbine to be located north of the Libman manufacturing facility in Arcola, Douglas County, Illinois. Draft Environmental Assessment for the Libman Company Wind Energy Project Arcola, Douglas County, Illinois, DOE/EA-1806 (November 2010) More Documents & Publications EA-1804: Final Environmental Assessment EA-1859: Final Environmental Assessment EA-1818: Final Environmental Assessment

312

Extension of Comment Period on the Draft Integrated, Interagency  

Broader source: Energy.gov (indexed) [DOE]

Extension of Comment Period on the Draft Integrated, Interagency Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations September 25, 2013 - 4:24pm Addthis On August 29, 2013, the U.S. Department of Energy (DOE) published a Request for Information seeking information on a draft Integrated, Interagency Pre-Application (IIP) Process for significant onshore electric transmission projects requiring Federal authorizations. An announcement extending the public comment period for submitting comments regarding the IIP Process was published in the Federal Register on

313

EIS-0382: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts of the proposed Mesaba Energy Project, a coal-based Integrated Gasification Combined Cycle (IGCC) electric power generating facility that would be located in the Taconite Tax Relief Area (TTRA) of northeastern Minnesota. Excelsior Energy Inc. (Excelsior) proposes to design, construct, and operate the Mesaba Energy Project in two phases; each phase would nominally generate 606 megawatts of electricity (MWe) for export to the electrical grid, 1,212 MWe total. DOE's Proposed Action is to provide a total of $36 million in co-funding, through a

314

EIS-0464: Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0464: Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas This draft Environmental Impact Statement (EIS) provides information about the potential environmental impacts associated with the Department of Energy's (DOE's) proposed action to provide financial assistance to Leucadia Energy, LLC (Leucadia) and with Leucadia's proposed Lake Charles Carbon Capture and Sequestration (CCS) project. DOE's proposed action would provide financial assistance to Leucadia under the Industrial Carbon Capture and Sequestration (ICCS) Program to support construction and operation of Leucadia's Lake Charles CCS project. DOE proposes to provide Leucadia with up to $261.4 million, which would constitute about 60

315

West Valley Melter Draft Waste Evaluation Released for Public Comment |  

Broader source: Energy.gov (indexed) [DOE]

Melter Draft Waste Evaluation Released for Public Melter Draft Waste Evaluation Released for Public Comment West Valley Melter Draft Waste Evaluation Released for Public Comment March 11, 2011 - 12:00pm Addthis Media Contact Bill Taylor (513) 246-0539 william.taylor@emcbc.doe.gov West Valley, New York - The U.S. Department of Energy today released a Draft Waste Incidental to Reprocessing (WIR) Evaluation of a vitrification melter at the West Valley Demonstration Project (WVDP) for review and comment by the public, states and Nuclear Regulatory Commission (NRC). This draft evaluation shows that the melter meets the criteria for "waste incidental to reprocessing" and may be managed and disposed of as low-level radioactive waste (LLW). It is an important step in DOE's efforts to clean up the WVDP and meet its obligations under the WVDP Act of

316

EIS-0340: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0340: Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project To assist in the conservation and recovery of Chinook salmon native to the Grande Ronde River and Imnaha River subbasins, the Proposed Action of updating and modifying two existing hatcheries and constructing three new hatchery facilities at other sites is being studied in this Draft Environmental Impact Statement (Draft EIS). BPA proposes to fund the capital improvements and the operation and maintenance of all five facilities to aid BPA's efforts to mitigate and recover anadromous fish affected by the Federal Columbia River Power System. The Lower Snake River run of spring/summer chinook was listed as threatened under the Endangered

317

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

318

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Broader source: Energy.gov (indexed) [DOE]

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

319

Draft AGENDA  

Broader source: Energy.gov (indexed) [DOE]

Quorum Room, 2 Quorum Room, 2 nd Floor Washington, D.C. 20024 December 18, 2009 8:30 a.m. Continental Breakfast NEAC members 9:00 a.m. Welcome and Opening Remarks Chairman Bill Martin and Warren "Pete" Miller, NE-1 9:15 a.m. Introduction of New Members Dr. Miller, NE 9:30 a.m. NE's Strategic Goals and Direction Dr. Miller, NE w/ Q&A from Committee 10:45 a.m. Break 11:00 a.m. Nuclear Energy R&D Roadmap Buzz Savage, NE 12:00 noon Lunch Montcalm Room 1:00 p.m. Update on the Next Generation Tom O'Connor, NE Nuclear Plant Project 1:30 p.m. Discussion of NEAC Subcommittees Chairman Martin 2:00 p.m. Nuclear Energy Policy Discussion Chairman Martin 2:15 p.m. Break 2:30 p.m. Nuclear Energy Technology Discussion Vice Chairman Ahearne

320

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

3-S1: Supplement to the Draft Programmatic Environmental 3-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment. Through this Supplement, the BLM has modified its preferred alternative to

322

EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EIS-0403-S1: Supplement to the Draft Programmatic Environmental EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE/EIS-0403D-S1. As described in DOE's proposed action in the Draft Solar PEIS, DOE would develop and adopt programmatic environmental guidance which would be used by DOE to further integrate environmental considerations into its analysis and selection of proposed solar projects. DOE has used the information about environmental impacts provided in the Draft Solar PEIS and other information to develop draft programmatic guidance. DOE has included the draft programmatic guidance in this Supplement for public comment.

323

EIS-0336: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0336: Draft Environmental Impact Statement Tucson Electric Power Company Sahuarita-Nogales Transmission Line On August 17, 2000, TEP applied to DOE/FE for a Presidential Permit to construct a double-circuit 345,000 volt (345 kV) electric transmission line that would begin south of Tucson, Arizona, in the vicinity of Sahuarita, cross the U.S.-Mexico border, and continue into the Sonoran region of northern Mexico to Santa Ana.FE has prepared this Draft EIS to address the environmental impacts of the proposed action and reasonable alternatives, including the "No Action" alternative. In addition, because the U.S. Forest Service, the Bureau of Land Management, and the U.S. International Boundary Water Commission (USIBWC) must act, and because their actions are

324

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Broader source: Energy.gov (indexed) [DOE]

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

325

EA-1792: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1792: Draft Environmental Assessment University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, Gulf of Maine This EA evaluates the environmental impacts of the Proposed Action and the No-Action Alternative; identifies unavoidable adverse environmental impacts of the Proposed Action; describes the relationship between local short-term uses of the environment and the maintenance and enhancement of long-term productivity; and characterizes any irreversible and irretrievable commitments of resources that would be involved should DOE decide to implement its Proposed Action. Draft Environmental Assessment for University of Maine's Deepwater Offshore Floating Wind Turbine Testing and Demonstration Project, DOE/EA-1792 (May

326

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions  

Broader source: Energy.gov (indexed) [DOE]

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution July 2, 2013 - 12:16pm Addthis What are the key facts? This solicitation will support projects that avoid, reduce, or sequester air pollutants or greenhouse gas emissions, an important part of the Administration's long-term plan towards a cleaner and more secure energy future. Applications for projects and facilities include any fossil technology that is new or significantly improved, as compared to commercial technologies in service in the U.S. The Department of Energy's (DOE) Loan Programs Office is releasing a new draft loan guarantee solicitation for innovative and advanced fossil energy

327

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

328

EIS-0488: FERC Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

88: FERC Draft Environmental Impact Statement 88: FERC Draft Environmental Impact Statement EIS-0488: FERC Draft Environmental Impact Statement Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

329

EIS-0337: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Draft Environmental Impact Statement 7: Draft Environmental Impact Statement EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management Environmental Impact Statement is to provide information on the environmental impacts of the Department of Energy's proposed action to ship radioactive wastes that are either currently in storage, or that will be generated from operations over the next 10 years, to offsite disposal locations, and to continue its ongoing onsite waste management activities. Decommissioning or long-term stewardship decisions will be reached based on a separate EIS that is being prepared for that decisionmaking. This EIS evaluates the environmental consequences that may result from actions to

330

EIS-0444: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0444: Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas This draft environmental impact statement (EIS) provides information about the potential environmental impacts associated with the U.S. Department of Energy's (DOE) proposal to provide limited financial assistance (approximately $450 million), through a cooperative agreement, to Summit Texas Clean Energy, LLC (Summit) for the proposed Texas Clean Energy Project (TCEP). The TCEP would use coal-based integrated gasification combined-cycle technology to generate electric power and would capture carbon dioxide (CO2) for use in enhanced oil recovery (EOR) and eventual sequestration. The plant would generate 400 megawatts (gross) of

331

EA-1867: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1867: Draft Environmental Assessment RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (October 2011) DOE prepared this Draft EA to evaluate the potential environmental consequences of its Proposed Action to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTI's high-temperature syngas cleanup and carbon capture and sequestration technologies. Approximately $168.8 million of DOE's total $171.8 million funding for the proposed project would be provided from funds authorized in the American Recovery and Reinvestment Act of 2009 (Public Law 111-5, 123 Stat. 115). RTI's

332

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions  

Broader source: Energy.gov (indexed) [DOE]

FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution FACT SHEET: Draft Advanced Fossil Energy Solicitation to Support Reductions in Greenhouse Gas and Other Pollution July 2, 2013 - 12:16pm Addthis What are the key facts? This solicitation will support projects that avoid, reduce, or sequester air pollutants or greenhouse gas emissions, an important part of the Administration's long-term plan towards a cleaner and more secure energy future. Applications for projects and facilities include any fossil technology that is new or significantly improved, as compared to commercial technologies in service in the U.S. The Department of Energy's (DOE) Loan Programs Office is releasing a new draft loan guarantee solicitation for innovative and advanced fossil energy

333

EIS-0488: EPA Notice of Availability of Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

488: EPA Notice of Availability of Draft Environmental Impact 488: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the availability of the Draft EIS for the Cameron Liquefaction Project, Cameron Parish, Louisiana. The Federal Energy Regulatory Commission (FERC) proposes to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is

334

EA-1080: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1080: Draft Environmental Assessment Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System This environmental assessment (EA) evaluates the potential impacts of a proposed demonstration project to be cost-shared by DOE and NOXSO Corporation under the terms of Clean Coal Technology (CCT) Demonstration Program. The project would demonstrate the NOXSO flue gas treatment technology, which is designed to reduce sulfur dioxide (SO2) and nitrogen oxides (NOX) emissions from existing coal-fired electric generating units. Draft Environmental Assessment for the Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System, DOE/EA-1080 (June 1995) More Documents & Publications EA-1080: Finding of No Significant Impact

335

EIS-0284: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0284: EPA Notice of Availability of the Draft Environmental Impact Statement Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric Power Plant, Elkhart, Logan County, Illinois DOE/EIS-0284, Environmental Protection Agency, Notice of Availability of the Draft Environmental Impact Statement for the Low Emission Boiler System Proof-of-Concept Project, Construction and Operation of a 91-Megawatt Electric Power Plant, Elkhart, Logan County, Illinois, 69 FR 10442 (March 2004) More Documents & Publications EIS-0348: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0397: EPA Notice of Availability of the Draft Environmental Impact

336

EIS-0350: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0350: DOE Notice of Availability of the Draft Environmental Impact Statement Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico U.S. Department of Energy (DOE), announces the availability of the Draft Environmental Impact Statement for the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, New Mexico (the Draft CMRR EIS), and the dates and locations for the public hearings to receive comments on the Draft CMRR EIS. The present Chemistry and Metallurgy Research (CMR) Building at Los Alamos National Laboratory (LANL) houses mission critical analytical chemistry, material

337

EIS-0444: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

444: EPA Notice of Availability of the Draft Environmental 444: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0444: EPA Notice of Availability of the Draft Environmental Impact Statement Texas Clean Energy Project, Ector County, Texas Notice of Availability - Draft Environmental Impact Statement Texan Clean Energy Project, Construction and Operation of a Coal-Based Electric Power Generation and Chemicals Production Plant, Odessa, Ector County, Texas, DOE/EIS-0444 (March 2011 - 76 FR 14968) More Documents & Publications EIS-0403: EPA Amended Notice of Availability of the Draft Programmatic Environmental Impact Statement (Extension of Public Comment Period) EIS-0444: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact

338

EIS-0332: McNary-John Day Transmission Line Project, OR  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

339

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

340

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

SciTech Connect (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program  

E-Print Network [OSTI]

DRAFTING TECHNOLOGY The Drafting Technology Program offers a certificate or associate of applied science in drafting technology. The certificate program offers a choice of six areas of emphasis: architectural drafting; civil drafting; information technology; mechanical and electrical drafting; process

Ickert-Bond, Steffi

342

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation...  

Office of Environmental Management (EM)

Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Energy Solicitation Public Meeting Presentation Draft Advanced Nuclear Solicitation...

343

EA-1921: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1921: Draft Environmental Assessment The Bureau of Land Management (BLM)(lead agency) and DOE are jointly preparing this EA, which evaluates the potential environmental impacts of a project proposed by Rockwood Lithium Inc (Rockwood), formerly doing business as Chemetall Foote Corporation. Rockwood has submitted to the BLM, Tonopah Field Office, an Operations Plan for the construction, operation, and maintenance of the Silver Peak Area Geothermal Exploration Project within Esmeralda County, Nevada. The purpose of the project is to determine subsurface temperatures, confirm the existence of geothermal resources, and confirm the existence of a commercial geothermal reservoir at the proposed well sites within federal geothermal lease N-87008. The proposed project

344

EIS-0374: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0374: Draft Environmental Impact Statement Klondike III/Biglow Canyon Project Wind Integration Project BPA has been asked by PPM Energy, Inc. to interconnect 300 megawatts (MW) of electricity generated from the proposed Klondike III Wind Project to the Federal Columbia River Transmission System. Orion Energy LLC has also asked BPA to interconnect 400 MW of electricity from its proposed Biglow Canyon Wind Farm, located north and east of the proposed Klondike III Wind Project. EIS-0374-DEIS-Summary-2006.pdf EIS-0374-DEIS-2006.pdf EIS-0374-DEIS-commentextension-2005.pdf More Documents & Publications EIS-0374: Final Environmental Impact Statement EIS-0374: Notice of Extension of Comment Period EIS-0374: Record of Decision

345

EIS-0418: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0418: Draft Environmental Impact Statement South Dakota PrairieWinds Project, Deer Creek Station Energy Facility Project, Brookings County, South Dakota In response to a request from Basin Electric Power Cooperative (Basin Electric), Western Area Power Administration (Western) proposes to provide interconnection services, and Rural Utilities Service (RUS) proposes to provide financial assistance, for the Deer Creek Station Project, a proposed 300-megawatt (MW) natural gas-fired generation facility. The facility is being proposed to meet projected intermediate demands for electricity in the eastern portion of Basin Electric Power Cooperative's service territory, as determined from a power supply analysis. Basin Electric's alternatives analysis included alternative power generation

346

EIS-0473: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0473: Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, Texas This EIS evaluates the potential impacts associated with DOE's Proposed Action to provide financial assistance to NRG Energy, Inc. (NRG) and with NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (Parish PCCS Project). DOE's Proposed Action would provide $167 million in cost-shared financial assistance to NRG under the Clean Coal Power Initiative (CCPI) Program to support construction and operation of NRG's Parish PCCS Project . EIS-0473-DEIS-Summary-2012.pdf EIS-0473-DEIS-VolumeI-2012.pdf EIS-0473-DEIS-VolumeII-AppendicesA-B-2012.pdf EIS-0473-DEIS-VolumeII-AppendixC-Part1-2012.pdf

347

EA-1812: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips Counties, Colorado For more information, contact: Ms. Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, Colorado 80401 Electronic mail: melissa.rossiter@go.doe.gov DOE is proposing to authorize the expenditure of Federal funding through the Community Renewable Energy Deployment Program to Phillips County for design, permitting, and construction of an approximately 30-megawatt wind energy project, known as Haxtun Wind Project, within Phillips and Logan counties in northeastern Colorado. The proposed project consists of 18 wind turbines that would interconnect to the Highline Electric Cooperative equipment inside Western Area Power Administration's Haxtun substation just

348

EA-1769: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1769: Draft Environmental Assessment Battleground Energy Recovery Project Harris County, Texas The proposed project is consistent with DOE's goal of increased use of energy efficiency and renewable energy generation projects. The proposed project involves installation of a specifically designed waste heat recovery boiler on the existing kiln afterburner of an incineration unit at the CHDP facility. This boiler would use heat from the incinerator flue gases to generate high pressure superheated steam. The adjacent Dow Chemical plant would periodically consume part of the steam for process needs, replacing natural gas firing of existing boilers. The majority of the steam, however, would be piped to a new steam turbine-generator (STG).

349

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Services construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

350

Points, lines and diamonds: a two-sorted modal logic for projective planes  

Science Journals Connector (OSTI)

......P1) each pair of distinct points is connected by exactly one...lines intersects in exactly one point, (P3) there are at least four points such that no three of them are...obviously, here one could lift the restriction that and ' be......

Y Venema

1999-10-01T23:59:59.000Z

351

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

352

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana  

Broader source: Energy.gov [DOE]

DOEs Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana.

353

EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

354

EIS-0336: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement'' (DOE/EIS-0336) for public review and comment. DOE/EIS-0336, Department of Energy, Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line, 68 FR 51569 (August 2003) More Documents & Publications EIS-0336: Final Environmental Impact Statement

355

DOE/EA-1508: Environmental Assessment for the Beaver Creek-Hoyt-Erie Transmission Line Rebuild Project  

Broader source: Energy.gov (indexed) [DOE]

BC-HT-EE Mitigation Action Plan Nov. 2005 1 BC-HT-EE Mitigation Action Plan Nov. 2005 1 Mitigation Action Plan To Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 BC-HT-EE Mitigation Action Plan Nov. 2005 2 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Construction Contractor Western Maintenance The contractor shall limit the movement of crews and equipment to the ROW, including access routes. The contractor shall limit movement on the ROW to minimize damage to residential yards, grazing land, crops, orchards, and property, and shall avoid marring the lands.

356

Secretarial Review Draft Environmental Assessment/  

E-Print Network [OSTI]

Secretarial Review Draft Environmental Assessment/ Regulatory Impact Review/Initial Regulatory review draft Environmental Assessment/Regulatory Impact Review/Initial Regulatory Flexibility Analysis Flexibility Analysis For the Arctic Fishery Management Plan And Amendment 29 to the Fishery Management Plan

357

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Broader source: Energy.gov (indexed) [DOE]

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

358

EA-1906: Draft Environmental Assessment  

Broader source: Energy.gov [DOE]

Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

359

Whistling Ridge Energy Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Whistling Ridge Energy Project Bonneville Power...

360

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

Not Available

1993-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EIS-0399: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a merchant 230-kV transmission line between Great Falls, Montana, and Lethbridge, Alberta, that would cross the U.S.-Canada border north of Cut Bank, Montana. The transmission line would transmit 300 megawatts (MW) of electric power south and 300 MW north. EIS-0399-DEIS-Summary-2008.pdf EIS-0399-DEIS-01a-2008.pdf EIS-0399-DEIS-01b-2008.pdf EIS-0399-DEIS-01c-2008.pdf EIS-0399-DEIS-01d-2008.pdf EIS-0399-DEIS-01e-2008.pdf EIS-0399-DEIS-02-2008.pdf More Documents & Publications EIS-0399: Final Environmental Impact Statement EIS-0399-SA-01: Supplement Analysis Management Alert: OAS-RA-12-01

362

EIS-0460: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0460: DOE Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois DOE announces the availability of the Draft Environmental Impact Statement for the FutureGen 2.0 Project (DOE/EIS-0460D) for public review and comment, as well as the date, location, and time for a public hearing. The draft environmental impact statement (EIS) analyzes the potential impacts associated with the FutureGen 2.0 Project (FutureGen 2.0), which would be designed, constructed, operated, and partially funded by the FutureGen Industrial Alliance, Inc. (Alliance). In addition to Alliance funding, FutureGen 2.0 may receive approximately $1 billion in federal

363

EIS-0439: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

9: DOE Notice of Availability of the Draft Environmental 9: DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0439: DOE Notice of Availability of the Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA The Western Area Power Administration (Western) and the Loan Guarantee Program (LGP), the California Energy Commission (CEC), and the Bureau of Land Management (BLM), have prepared a Draft Environmental Impact Statement (EIS) and Staff Assessment (SA), which may require a California Desert Conservation Area (CDCA) Plan Amendment, as a joint environmental analysis document for the proposed Rice Solar Energy Project (Project), in Riverside County, California, and by this notice are announcing the opening of the comment period. Western Area Power Administration Draft Environmental Impact

364

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

365

EIS-0226: Revised Draft Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

6: Revised Draft Environmental Impact Statement 6: Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS include the Sitewide Removal Alternative, the Sitewide Close-In-Place Alternative, the Phased Decisionmaking Alternative (Preferred Alternative), and the No Action Alternative. The analysis and information contained in this EIS is intended to assist DOE and NYSERDA with the consideration of environmental impacts

366

Co~uter Aided Design/Drafting Development Recommendation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Co~uter Aided Design/Drafting Co~uter Aided Design/Drafting Development Recommendation for The Light Source Project K. J. Knott LS-71 September 1986 (9/8/86) LS-71 1.0 Introduction During all phases of the design of the 6-7 GeV Synchrotron Light Source, the design staff has assumed that most or all design and drafting for the pro- ject would be based on modern Computer-Aided Design/Drafting (CAD) equipment. The reasons and justification for this assumption are many and varied and include the following: 1. It represents a cost-effective approach to these tasks. 2. It represents a local and national trend in engineering technology. 3. It opens the possibility for numerical control (NC) interfaces. 4. It opens the possibility for Computer-Aided-Engineering (CAE) applications such as stress, temperature and other finite-element

367

EIS-0488: Notice of Availability Draft Environmental Impact Statement |  

Broader source: Energy.gov (indexed) [DOE]

488: Notice of Availability Draft Environmental Impact 488: Notice of Availability Draft Environmental Impact Statement EIS-0488: Notice of Availability Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the EIS. DOE, Office of Fossil Energy, has an obligation under Section 3 of the Natural Gas Act to authorize the import and export of natural gas, including LNG, unless it finds that the import or export is not consistent with the public interest. EIS-0488-DEIS-NOA-2014.pdf More Documents & Publications

368

EIS-0355: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0355: Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's (DOE's) proposal to (1) remediate approximately 11.9 million tons of contaminated materials located on the Moab site and approximately 39,700 tons located on nearby vicinity properties and (2) develop and implement a ground water compliance strategy for the Moab site using the framework of the Final Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project (DOE/EIS-0198,

369

EIS-0403: Draft Programmatic Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

Draft Programmatic Environmental Impact Statement Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM and DOE are considering taking actions to facilitate solar energy development in compliance with various orders, mandates, and agency policies. For the BLM, these actions include the evaluation of a new BLM Solar Energy Program applicable to all utility-scale solar energy development on BLM-administered lands in six southwestern states (Arizona, California, Colorado, Nevada, New Mexico, and Utah). For DOE, they include the evaluation of developing new program guidance relevant to DOE-supported solar projects. The Draft PEIS assesses the environmental, social, and economic effects of the agencies' proposed actions and

370

EIS-0408: Draft Programmatic Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement EIS-0408: Draft Programmatic Environmental Impact Statement Upper Great Plains Programmatic Wind EIS This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-2013.pdf More Documents & Publications EIS-0403: Draft Programmatic Environmental Impact Statement EIS-0403: Final Programmatic Environmental Impact Statement

371

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8: Draft Environmental Impact Statement 8: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

372

EIS-0488: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG) import terminal in Cameron Parish, Louisiana, to enable the terminal to liquefy and export the LNG. EIS-0488-DEIS-Cover-2014.pdf (NOTE: Correct Cover Date: January 2014) EIS-0488-DEIS-TOC-2014.pdf EIS-0488-DEIS-ExecutiveSummary-2014.pdf EIS-0488-DEIS-Sections1-5-2014.pdf

373

EA-1829: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI For more information, contact: Mr. Jesse Garcia NEPA Document Manager U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road, P.O. Box 880 3610 Morgantown, WV 26507-0880 Electronic mail: Jesse.Garcia@netl.doe.gov The United States (U.S.) Department of Energy (DOE) proposes, through a cooperative agreement with Phycal, Inc. (Phycal), to partially fund implementing and evaluating new technology for the reuse of Carbon dioxide (CO2) emissions from industrial sources for green energy products. This project would use CO2 to grow algae for the production of algal oil and subsequent conversion to fuel. The project would generate reliable cost

374

EIS-0397: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0397: Draft Environmental Impact Statement Lyle Falls Fish Passage Project The underlying need for the project is to improve fish passage to habitat in the upper part of the watershed. Funding from BPA would serve to provide off-site mitigation for the effects of the federal Columbia River hydroelectric facilities on fish populations by improving fish passage at Lyle Falls. While the fish passage issues at Lyle Falls were not caused by the hydroelectric facilities, this project would help BPA meet its mitigation responsibilities and potentially increase overall fish production in the Columbia Basin by enhancing fish passage into the Klickitat subbasin. EIS-0397-DEIS-Summary-2008.pdf EIS-0397-DEIS-2008.pdf More Documents & Publications

375

EIS-0350-S1: Draft Supplemental Environmental Impact Statement | Department  

Broader source: Energy.gov (indexed) [DOE]

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, New Mexico National Nuclear Security Administration, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion (CMRR-NF) of the CMRR Project to provide the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building. This CMRR-NF SEIS examines the potential environmental impacts associated with NNSA's proposed

376

EA-1862: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin Comment Period Ends: 9/3/11 Submit comments to: Melissa Rossiter DOE Golden Field Office 1617 Cole Blvd Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce under the State Energy Program (SEP). Wisconsin selected an Oneida Seven Generations Corporation (Oneida) project to receive a $2 million loan under the SEP. The Bureau of Indian Affairs (BIA), an agency of the Department of the Interior (DOI), has already provided $584,000 in Federal funding to Oneida for this project. BIA is also considering providing a loan guarantee of up to $19 million. BIA made

377

EA-1949: FERC Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. EA-1949-FERC-DEA-2013.pdf More Documents & Publications EA-1949: FERC Notice of Availability of an Environmental Assessment EA-1949: FERC Final Environmental Assessment

378

EIS-0372: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or amendment of a permit for a proposed action is in the public interest, DOE considers the environmental impacts of the proposed project pursuant to NEPA, the project's impact on electric reliability by ascertaining whether the proposed project would adversely affect the operation of the U.S. electric power supply system

379

EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management The Department of Energy (DOE) announces the availability of the Draft Supplemental Environmental Impact Statement (SEIS) for the National Ignition Facility(NIF) Project Specific Analysis portion (Volume III, Appendix I) of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (SSM PEIS) DOE/EIS-0236-S1 for public review and comment. EIS-0236-S1-NOA_DEIS-1999.pdf More Documents & Publications EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic

380

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Binaries discovered by the SPY project. IV. Five single-lined DA double white dwarfs  

E-Print Network [OSTI]

We present results from our ongoing follow-up observations of double white dwarf binaries detected in the ESO SN Ia Progenitor SurveY (SPY). We discuss our observing strategy and data analysis and present the orbital solutions of five close double white dwarf binaries: HE0320-1917, HE1511-0448, WD0326-273, WD1013-010 and WD1210+140. Their periods range from 0.44 to 3.22 days. In none of these systems we find any spectral lines originating from the companion. This rules out main sequence companions and indicates that the companion white dwarfs are significantly older and cooler than the bright component. Infrared photometry suggests the presence of a cool, helium-rich white dwarf companion in the binary WD0326-273. We briefly discuss the consequences of our findings for our understanding of the formation and evolution of double white dwarfs.

G. Nelemans; R. Napiwotzki; C. Karl; T. R. Marsh; B. Voss; G. Roelofs; R. G. Izzard; M. Montgomery; T. Reerink; N. Christlieb; D. Reimers

2005-06-10T23:59:59.000Z

382

DOE/EA-1903 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S  

Broader source: Energy.gov (indexed) [DOE]

03 03 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S ZOND WIND ENERGY PROJECT MANHATTAN, KANSAS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2013 DOE/EA-1903 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S ZOND WIND ENERGY PROJECT MANHATTAN, KANSAS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office SEPTEMBER 2013 DOE/EA-1903 i September 2013 ACRONYMS AND ABBREVIATIONS BMPs best management practices CEQ Council on Environmental Quality CFR Code of Federal Regulations DASR digital airport surveillance radar dB decibel dBA decibel A-weighted

383

EIS-0357: DOE Notice of Availability of the Supplement to the Draft  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Supplement to the Draft DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement EIS-0357: DOE Notice of Availability of the Supplement to the Draft Environmental Impact Statement Gilberton Coal-to-Clean Fuels and Power Project The U.S. Department of Energy (DOE) announces the availability for public comment of a Supplement to the Draft Environmental Impact Statement for the Gilberton Coal-to- Clean Fuels and Power Project (DOE/ EIS-0357D-S1), prepared in response to comments on the original Draft Environmental Impact Statement (EIS) issued in December 2005. This Supplement corrects information regarding carbon dioxide (CO2) emissions from the proposed Gilberton plant, provides information on the feasibility of carbon sequestration for the CO2 emissions from the Gilberton plant, and presents

384

EIS-0407: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

07: EPA Notice of Availability of the Draft Environmental 07: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal Funding, Located near the City Hugoton, Stevens County, KS Notice of Availability of the Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EIS-0407)(74FR48951)(September 25, 2009) More Documents & Publications EIS-0407: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement

385

EIS-0361: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

1: EPA Notice of Availability of the Draft Environmental 1: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0361: EPA Notice of Availability of the Draft Environmental Impact Statement Western Greenbier Co-Production Demonstration Project Construction and Demonstration of a 98 megawatt (MWe) Net Power Plant and Ash Byproduct Manufacturing Facility, Rainelle, West Virginia Environmental Impact Statements; Notice of Availability (Western Greenbrier Co-Production Demonstration Project Draft Environmental Impact Statement (DOE/EIS-0361) (71FR69562) (12/01/06) More Documents & Publications EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0385: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0394: EPA Notice of Availability of the Draft

386

EIS-0413: EPA Notice of Availability of a Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of a Draft Environmental EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the Searchlight Wind Energy Project. The EIS evaluates the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by Western. EIS-0413-EPANOA-2012.pdf More Documents & Publications EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Final Environmental Impact Statement

387

EIS-0407: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas To Support the Design, Construction, and Startup of a Commercial-Scale Integrated Biorefinery, Federal Funding, Located near the City Hugoton, Stevens County, KS Notice of Availability of the Draft Environmental Impact Statement for the Proposed Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas (DOE/EIS-0407)(74FR48951)(September 25, 2009) More Documents & Publications EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement EIS-0407: EPA Notice of Availability of the Final Environmental Impact

388

EIS-0435: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0435: EPA Notice of Availability of the Draft Environmental Impact Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Notice of Availability for the Draft Environmental Impact Statement for the Groton Generation Station (GGS) Project, Proposes to Modify its Interconnection Agreement, Basin Electric Power Cooperative, for the (GGS) to Eliminate 50-Megawatts (MW) Annual Average Operating Limit, Brown County, South Dakota. Notice of Availability for the Draft Environmental Impact Statement for the Groton Generation Station (GGS) Project, Brown County, South Dakota, DOE/EIS-0435 (August 2010 - 75 FR 47591) More Documents & Publications

389

EIS-0382: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

DOE Notice of Availability of the Draft Environmental DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0382: DOE Notice of Availability of the Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN The draft environmental impact statement (EIS) analyzes the potential environmental consequences of DOE's proposed action to provide a total of $36 million in cofunding, through a financial assistance cooperative agreement, for the design and one-year operational demonstration of a coal-based, Integrated Gasification Combined Cycle (IGCC) electric generating facility on the Iron Range of northern Minnesota. Notice of Availability of the Draft Environmental Impact Statement for the Mesaba Energy Project (DOE/EIS-0382D)(November 8, 2007)(72FR63169) More Documents & Publications

390

EIS-0357: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

7: DOE Notice of Availability of the Draft Environmental 7: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings EIS-0357: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Gilberton Coal-to-Clean Fuels and Power Project The U.S. Department of Energy (DOE) announces the availability of the document, Draft Environmental Impact Statement for the Gilberton Coal to-Clean Fuels and Power Project (DOE/EIS-0357), for public comment. The draft environmental impact statement (EIS) analyzes the potential environmental consequences of providing federal funding for the design, engineering, construction, and operation of the first power facility in the United States to use coal waste as feed to a gasification facility that subsequently generates fuel gas for clean power, thermal energy, and clean

391

EIS-0413: EPA Notice of Availability of a Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EIS-0413: EPA Notice of Availability of a Draft Environmental EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy Project, Searchlight, NV EPA announces the availability of the Draft EIS for the Searchlight Wind Energy Project. The EIS evaluates the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by Western. EIS-0413-EPANOA-2012.pdf More Documents & Publications EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Final Environmental Impact

392

EIS-0365: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

5: EPA Notice of Availability of the Draft Environmental 5: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines Imperial-Mexicali 230-kV Transmission Lines, Construct a Double-Circuit 230-kV Transmission Line, Presidential Permit and Right-of- Way Grants, Imperial Valley Substation to Calexico at the U.S.- Mexico Border, Imperial County, CA Notice of Availability Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines (69FR26817) (May 14, 2004) More Documents & Publications EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Final

393

EIS-0365: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Impact Statement EIS-0365: EPA Notice of Availability of the Draft Environmental Impact Statement Imperial-Mexicali 230-kV Transmission Lines Imperial-Mexicali 230-kV Transmission Lines, Construct a Double-Circuit 230-kV Transmission Line, Presidential Permit and Right-of- Way Grants, Imperial Valley Substation to Calexico at the U.S.- Mexico Border, Imperial County, CA Notice of Availability Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines (69FR26817) (May 14, 2004) More Documents & Publications EIS-0365: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0286: EPA Notice of Availability of the Final Environmental Impact

394

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California  

Broader source: Energy.gov (indexed) [DOE]

2 2 Federal Register / Vol. 63, No. 30 / Friday, February 13, 1998 / Notices taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of his filing are on file with the Commission and are available for public inspection in the Public Reference Room. David P. Boergers, Acting Secretary. [FR Doc. 98-3659 Filed 2-12-98; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California AGENCY: Western Area Power Administration, DOE. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: In accordance with Section

395

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Broader source: Energy.gov (indexed) [DOE]

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

396

Chief Joseph Hatchery Program, Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Chief Joseph Hatchery Program Chief Joseph Hatchery Program Draft Environmental Impact Statement DOE/EIS-0384 May 2007 Chief Joseph Hatchery Program Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Project: Chief Joseph Hatchery Program Cooperating Tribe: Confederated Tribes of the Colville Reservation State Involved: Washington Abstract: The Draft Environmental Impact Statement (DEIS) describes a Chinook salmon hatchery production program sponsored by the Confederated Tribes of the Colville Reservation (Colville Tribes). BPA proposes to fund the construction, operation and maintenance of the program to help mitigate for anadromous fish affected by the Federal Columbia River Power System dams on the Columbia River. The Colville Tribes want to produce adequate

397

JGI - The GEBA Pilot Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

GEBA Sequencing Plans GEBA Sequencing Plans For status information, see the Genome Projects section, or go to Microbial Genomics to find the latest releases. Organism Domain Phylum Status IMG-ER NCBI PID Culture ID GOLD ID Acidimicrobium ferrooxidans DSM 10331 Bacteria Actinobacteria draft DSM 10331 Gi02326 Actinosynnema mirum 101, DSM 43827 Bacteria Actinobacteria draft 2500395345 19705 DSM 43827 Gi02064 Alicyclobacillus acidocaldarius acidocaldarius 104-IA, DSM 446 Bacteria Firmicutes draft 29405 DSM 446 Gi02324 Anaerococcus prevotii PC 1, DSM 20548 Bacteria Firmicutes draft DSM 20548 Gi02318 Atopobium parvulum IPP 1246, DSM 20469 Bacteria Actinobacteria draft 29401 DSM 20469 Gi02317 Beutenbergia cavernosa HKI 0122, DSM 12333 Bacteria Actinobacteria draft 2500395322 20827 DSM 12333 Gi02225

398

EIS-0378: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0378: Draft Environmental Impact Statement Port Angeles-Juan de Fuca Transmission Project Sea Breeze Olympic Converter LP (Sea Breeze) has applied to the United States Department of Energy (DOE) for authorizations and approvals necessary to construct the U.S. portion of a proposed international electric power transmission cable. Specifically, Sea Breeze has applied to the Office of Electricity Delivery and Energy Reliability (DOE/OE), an organizational unit within DOE, for a Presidential permit for its project. Sea Breeze has also submitted a request to Bonneville Power Administration (BPA), another organizational unit within DOE, for interconnection into the federal transmission system. EIS-0378-DEIS-Summary-2007.pdf

399

EA-1800: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1800: Draft Environmental Assessment Monarch Warren County Wind Turbine Project, Lenox Township, Warren County, Illinois The U.S. Department of Energy (DOE) has provided Federal funding to the Illinois Department of Commerce and Economic Opportunity (DCEO) under the State Energy Program (SEP). DCEO is seeking to provide $5 million of its SEP funds to Monarch Wind Power (MWP), who would use these funds for the design, permitting and construction of 12, 1.6- megawatt wind turbines, for a combined generation capacity of 19.2 megawatts. This EA provides DOE and other decisionmakers the information needed to make an informed decision about the installation, operation, and eventual decommissioning of the proposed wind project. The EA evaluates the potential individual and

400

EA-1944: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1944: Draft Environmental Assessment Ormat Technologies Brady Hot Springs Project, Churchill County, NV This EA evaluates a proposal by Ormat Technologies, Inc. (Ormat) to use DOE and cost share funding to study the Brady Hot Springs geothermal Field 15-12RD well. This is an EGS Demonstration project divided into three phases. During Phase 1, Ormat characterized the target well to prepare for stimulation activities in Phase 2, Phase 2: Well Stimulation and Collection/Analysis of Stimulation Monitoring Data and Phase 3: Long-term testing of the system. Phase 2 and 3 activities would occur at Ormat's Brady Hot Springs geothermal field in Churchill County, NV on public lands managed by the Bureau of Land Management (BLM) and Bureau of Reclamation

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

EA-1793: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3: Draft Environmental Assessment 3: Draft Environmental Assessment EA-1793: Draft Environmental Assessment Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site The U.S. Department of Energy (DOE) proposes to provide replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017. Historically, INL has disposed of this LLW onsite. However, the existing disposal area located within the INL Radioactive Waste Management Complex will undergo closure as part of ongoing cleanup of INL and will not be available after 2017. The proposed project to establish replacement capability is not a DOE Environmental Management Idaho Cleanup Project

402

The hybrid reactor project based on the straight field line mirror concept  

SciTech Connect (OSTI)

The straight field line mirror (SFLM) concept is aiming towards a steady-state compact fusion neutron source. Besides the possibility for steady state operation for a year or more, the geometry is chosen to avoid high loads on materials and plasma facing components. A comparatively small fusion hybrid device with 'semi-poor' plasma confinement (with a low fusion Q factor) may be developed for industrial transmutation and energy production from spent nuclear fuel. This opportunity arises from a large fission to fusion energy multiplication ratio, Q{sub r} = P{sub fis}/P{sub fus}>>1. The upper bound on Q{sub r} is primarily determined by geometry and reactor safety. For the SFLM, the upper bound is Q{sub r} Almost-Equal-To 150, corresponding to a neutron multiplicity of k{sub eff}=0.97. Power production in a mirror hybrid is predicted for a substantially lower electron temperature than the requirement T{sub e} Almost-Equal-To 10 keV for a fusion reactor. Power production in the SFLM seems possible with Q Almost-Equal-To 0.15, which is 10 times lower than typically anticipated for hybrids (and 100 times smaller than required for a fusion reactor). This relaxes plasma confinement demands, and broadens the range for use of plasmas with supra-thermal ions in hybrid reactors. The SFLM concept is based on a mirror machine stabilized by qudrupolar magnetic fields and large expander tanks beyond the confinement region. The purpose of the expander tanks is to distribute axial plasma loss flow over a sufficiently large area so that the receiving plates can withstand the heat. Plasma stability is not relying on a plasma flow into the expander regions. With a suppressed plasma flow into the expander tanks, a possibility arise for higher electron temperature. A brief presentation will be given on basic theory for the SFLM with plasma stability and electron temperature issues, RF heating computations with sloshing ion formation, neutron transport computations with reactor safety margins and material load estimates, magnetic coil designs as well as a discussion on the implications of the geometry for possible diagnostics. Reactor safety issues are addressed and a vertical orientation of the device could assist passive coolant circulation. Specific attention is put to a device with a 25 m long confinement region and 40 cm plasma radius in the mid-plane. In an optimal case (k{sub eff}= 0.97) with a fusion power of only 10 MW, such a device may be capable of producing a power of 1.5 GW{sub th}.

Agren, O.; Noack, K.; Moiseenko, V. E.; Hagnestal, A.; Kaellne, J.; Anglart, H. [Uppsala University, Angstroem Laboratory, Uppsala University, Box 534, SE-751 21 Uppsala (Sweden); Institute of Plasma Physics, National Science Center 'Kharkiv Institute of Physics and Technology', 61108 Kharkiv (Ukraine); Uppsala University, Angstroem Laboratory, Uppsala University, Box 534, SE-751 21 Uppsala (Sweden); Royal Institute of Technology, Nuclear Reactor Technology, SE 100 44 Stockholm (Sweden)

2012-06-19T23:59:59.000Z

403

U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Draft Environmental Impact Statement DOE/EIS-0290-D  

Broader source: Energy.gov (indexed) [DOE]

E-1-1 E-1-1 APPENDIX E TECHNICAL METHODOLOGIES AND KEY DATA E-1 SOCIOECONOMICS E-1.1 Methodology and Key Assumptions for Socioeconomics The socioeconomic impact analysis evaluates both the impacts on regional economic activity, as measured by changes in employment and earnings, and the impacts on communities surrounding Idaho National Engineering and Environmental Laboratory (INEEL), as measured by changes in population and the demand for housing and public services. The study area comprises a seven-county Region of Influence (ROI) and socioeconomic impacts are estimated for each of the proposed Advanced Mixed Waste Treatment Project (AMWTP) alternatives. The methodology employed for the AMWTP Environmental Impact Statement (EIS) is similar to that used in the Programmatic Spent Nuclear Fuel Management and

404

EPA Notice of Availability of the Orlando Gasification Project Draft Environmental Impact Statement (DOE/EIS-0383) (08/25/06)  

Broader source: Energy.gov (indexed) [DOE]

11 Federal Register 11 Federal Register / Vol. 71, No. 165 / Friday, August 25, 2006 / Notices Summary: EPA was supportive of the selection of the Drainage Impaired Land Retirement Alternative, but expressed environmental concerns about treatment methods to remove selenium from drainage water and potential impacts to air quality. EPA requested additional analysis and monitoring commitments prior to implementation of any alternative and expressed continued objections if an out of valley alternative. EIS No. 20060259, ERP No. F-BLM- J02042-UT, Uinta Basin Natural Gas Project, Proposal to Produce and Transport Natural Gas in the Atchee Wash Oil and Gas Production Region, Resource Development Group, Right- of-Way Grant, U.S. COE Section 404 Permit and Endangered Species Act

405

U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Draft Environmental Impact Statement DOE/EIS-0290-D  

Broader source: Energy.gov (indexed) [DOE]

F-1 F-1 APPENDIX F PROJECT HISTORY Waste History/Description From 1970 through the early 1980's the Idaho National Engineering and Environmental Laboratory (INEEL) accepted over 65,000 cubic meters of transuranic (TRU) and alpha- contaminated waste from other U.S. Department of Energy (DOE) sites. These wastes were placed in above ground storage at the Radioactive Waste Management Complex (RWMC) on the INEEL. The wastes are primarily laboratory and processing wastes of various solid materials, including paper, cloth, plastics, rubber, glass, graphite, bricks, concrete, metals, nitrate salts, and absorbed liquids. Over 95 percent of the waste was generated at DOE's Rocky Flats Plant in Colorado and transported to the INEEL by rail in bins, boxes, and drums. All 65,000 cubic meters was

406

Deadline to Review Draft M&V Guidelines Extended to December...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Program (FEMP) is extending its request for public comment on the draft M&V Guidelines: Measurement and Verification for Federal Energy Projects (Version 4.0). The document...

407

EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona |  

Broader source: Energy.gov (indexed) [DOE]

41: Mohave County Wind Farm Project, Mohave County, Arizona 41: Mohave County Wind Farm Project, Mohave County, Arizona EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona Summary This EIS, prepared by the Bureau of Land Management with DOE's Western Area Power Administration as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Western's transmission lines.The project website is http://www.blm.gov/az/st/en/prog/energy/wind/mohave.html. Public Comment Opportunities None available at this time. Documents Available for Download Draft EIS posted at http://www.blm.gov/az/st/en/prog/energy/wind/mohave/reports/DEIS.html.

408

BPA, Transmission, I-5 Corridor Reinforcement Project, November...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft tower, line locations available BPA has released its preliminary designs showing tower and right-of-way locations. Information is now available online, allowing landowners to...

409

Socioeconomic effects of DRAFT power marketing options of the Central Valley and Washoe Projects: 2005 regional economic impact analysis using IMPLAN  

SciTech Connect (OSTI)

This report summarizes the methods and conclusions of an economic analysis of the distributional effects of alternative actions that Sierra Nevada could take with its new marketing plan. These alternatives are summarized in the agency`s Environmental Impact Statement (EIS), and this study directly supports the findings in the EIS. The study evaluates the potential economic impacts projected to occur across the northern and central California area currently serviced by Sierra Nevada`s customers. A standard input-output estimation approach was used to calculate impacts on regional output, labor income, and employment. The IMPLAN regional economic modeling system was used to develop regional models for the analysis. Individual regional models were developed for the overall area, the San Francisco Consolidated Metropolitan Statistical Area, the Sacramento Consolidated Metropolitan Statistical Area, the Redding Metropolitan Statistical Area, and the Bakersfield Metropolitan Statistical Area. The analysis relies on information about the effect of Sierra Nevada`s alternative actions on overall system power costs for the year 2005 developed by RW Beck and Associates (Beck-1996). This information is used as input to the 2005 benchmarked IMPLAN regional economic models. The resulting economic impact estimates are inextricably linked to this input information about changes in system power costs, and the estimates reported here are of similar relative magnitude to those estimates. The potential economic effects of Sierra Nevada`s actions are extremely small in relation to the size of the economies potentially affected, and, although they are calculable, they are not significant and often difficult to separate from random error present in the models.

Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

1996-04-01T23:59:59.000Z

410

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

411

Draft Genome Sequence  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Draft Genome Sequence of Serratia sp. Strain ATCC 39006, a Model Bacterium for Analysis of the Biosynthesis and Regulation of Prodigiosin, a Carbapenem, and Gas Vesicles Peter C. Fineran, a Marina C. Iglesias Cans, a Joshua P. Ramsay, b Nabil M. Wilf, b Desiree Cossyleon, a Matthew B. McNeil, a Neil R. Williamson, b Rita E. Monson, b S. Anette Becher, c Jo-Ann L. Stanton, d Kim Brügger, e Steven D. Brown, f George P. C. Salmond b Department of Microbiology and Immunology, University of Otago, Dunedin, New Zealand a ; Department of Biochemistry, University of Cambridge, Cambridge, United Kingdom b ; AgResearch Ltd., Invermay Agricultural Centre, Mosgiel, New Zealand c ; Department of Anatomy, University of Otago, Dunedin, New Zealand d ; EASIH, University of Cambridge, Addenbrooke's Hospital, Cambridge, United Kingdom e ; Biosciences Division, Oak Ridge National Laboratory, Oak Ridge,

412

DRAFT DRAFT Electricity and Natural Gas Sector Description  

E-Print Network [OSTI]

DRAFT DRAFT Electricity and Natural Gas Sector Description For Public Distribution AB 32 Scoping of electricity and natural gas; including electricity generation, combined heat and power, and electricity and natural gas end uses for residential and commercial purposes. Use of electricity and/or gas for industrial

413

DRAFT DRAFT Peer Production of Privacy and Security Information  

E-Print Network [OSTI]

DRAFT DRAFT Peer Production of Privacy and Security Information L Jean Camp* Informatics Indiana_Friedman@ksgphd.harvard.edu #12;2 L. Jean Camp and Allan Friedman, "Peer Production of Privacy and Security Information" Ethical operators in the model of the turn of the twentieth century, as it required at the turn of the nineteenth

Camp, L. Jean

414

EIS-0315-S1: SEIS on Caithness Big Sandy Project  

Broader source: Energy.gov [DOE]

In June 2001, the Bureau of Land Management (BLM) and Western Area Power Administration (Western) issued the Big Sandy Energy Project Draft Environmental Impact Statement (EIS) (BLM and Western 2001). After June 2001, Caithness Big Sandy, L.L.C. (Caithness), revised aspects of the Big Sandy Energy Project (Project) described as the Proposed Action in the Draft EIS.

415

EIS-0377: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

77: DOE Notice of Availability of the Draft Environmental 77: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings EIS-0377: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S. Department of Energy (DOE), Upper Great Plains Customer Service Region, and the Rural Utilities Service (RUS), U.S. Department of Agriculture, and U.S. Army Corps of Engineers (USACE), U.S. Department of Defense, as cooperating agencies, announce the availability of the Draft Big Stone II Power Plant and Transmission Project (Project) Environmental Impact Statement (EIS) for public review and comment. Otter Tail Corporation (dba Otter Tail Power

416

EIS-0377: DOE Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Impact Statement and Notice of Public Hearings EIS-0377: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Big Stone II Power Plant and Transmission Project Western Area Power Administration (Western), U.S. Department of Energy (DOE), Upper Great Plains Customer Service Region, and the Rural Utilities Service (RUS), U.S. Department of Agriculture, and U.S. Army Corps of Engineers (USACE), U.S. Department of Defense, as cooperating agencies, announce the availability of the Draft Big Stone II Power Plant and Transmission Project (Project) Environmental Impact Statement (EIS) for public review and comment. Otter Tail Corporation (dba Otter Tail Power Company (OTP)), Central Minnesota Municipal Power Agency, Great River

417

EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Notice of Intent to Prepare a Supplemental Draft Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement EIS-0469: Notice of Intent to Prepare a Supplemental Draft Environmental Impact Statement Proposed Wilton IV Wind Energy Center Project, Burleigh County, North Dakota Western Area Power Administration is evaluating the potential environmental impacts of interconnecting NextEra Energy Resources proposed Wilton IV Wind Energy Center Project, near Bismarck, North Dakota, to Western's existing Wilton/Baldwin substation and allowing NextEra's existing wind projects in this area to operate above 50 annual MW. Western is preparing a Supplemental Draft EIS to address substantial changes to the proposal, including 30 turbine locations and 5 alternate turbine locations in Crofte Township.

418

EIS-0346: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EIS-0346: EPA Notice of Availability of the Draft Environmental EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington DOE/EIS-0346, Notice of Availability of Draft EIS, Environmental Protection Agency, Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington, 69 FR 53916 (September 2004)

419

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

50: Grand Coulee-Creston Transmission Line Rebuild; Grant and 50: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington SUMMARY Bonneville Power Administration is preparing this EA to assess the potential environmental impacts of the proposed rebuild of approximately 28 miles of transmission line between the cities of Coulee Dam in Grant County and Creston in Lincoln County, Washington. The proposed project would include replacing all wood pole structures and conductor, improving existing access roads, and developing temporary access roads. Additional information is available at the project website: http://www.bpa.gov/goto/CouleeCrestonRebuild. PUBLIC COMMENT OPPORTUNITIES Draft EA: Comment Period Ends 2/3/14.

420

EIS-0250-S1: DOE Notice of Availability of the Draft Supplemental  

Broader source: Energy.gov (indexed) [DOE]

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement EIS-0250-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, NV and Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada--Nevada Rail Transportation Corridor The Department of Energy (DOE or the Department) announces the availability of two draft National Environmental Policy Act (NEPA) documents related to its Yucca Mountain Project: Draft Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

West Valley Seeks Comment on Draft Waste Evaluation | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Seeks Comment on Draft Waste Evaluation Seeks Comment on Draft Waste Evaluation West Valley Seeks Comment on Draft Waste Evaluation June 29, 2012 - 12:00pm Addthis Media Contacts Bryan Bower 716-942-4368 Bill Taylor bill.taylor@srs.gov 803-952-8564 West Valley, NY - The U.S. Department of Energy (DOE) today released to the Nuclear Regulatory Commission (NRC), the public and the states of Nevada and Texas, and the Seneca Nation of Indians for review and comment, a Draft Waste Incidental to Reprocessing Evaluation for the concentrator feed makeup tank and the melter feed hold tank (the vessels) at the West Valley Demonstration Project (WVDP). This Draft Evaluation, which may enable the Department to dispose of the vessels as low-level radioactive waste (LLW), is a necessary step in the Department's cleanup efforts at

422

MHK Cost Breakdown Structure Draft | OpenEI Community  

Open Energy Info (EERE)

MHK Cost Breakdown Structure Draft MHK Cost Breakdown Structure Draft Home > Groups > Water Power Forum Kch's picture Submitted by Kch(24) Member 9 April, 2013 - 13:30 CBS current energy GMREC LCOE levelized cost of energy marine energy MHK ocean energy The generalized Cost Breakdown Structure (CBS) for marine and hydrokinetic (MHK) projects is a hierarchical structure designed to facilitate the collection and organization of lifecycle costs of any type of MHK project, including wave energy converters and current energy convertners. At a high level, the categories in the CBS will be applicable to all projects; at a detailed level, however, the CBS includes many cost categories that will pertain to one project but not others. It is expected that many of the detailed levels of the CBS will be populated with "NA" or left blank.

423

EIS-0250-S2: Draft Supplemental Environmental Impact Statement | Department  

Broader source: Energy.gov (indexed) [DOE]

Draft Supplemental Environmental Impact Statement Draft Supplemental Environmental Impact Statement EIS-0250-S2: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain-Nevada Rail Transportation Corridor The Nevada Rail Corridor SEIS (DOE/EIS-0250F-S2D) analyzes the potential impacts of constructing and operating a railroad to connect the Yucca Mountain repository site to an existing rail line near Wabuska, Nevada (in the Mina rail corridor). The Nevada Rail Corridor SEIS analyzes the Mina rail corridor at a level of detail commensurate with that of the rail corridors analyzed in the Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level

424

EA-1665: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1665: Draft Environmental Assessment Davis-Kingman Tap 69-kV Transmission Line Rebuild, Mohave County, Arizona This Environmental Assessment (EA) evaluates the probable and known impacts to the environment from Western's Proposed Action, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with National Environmental Policy Act (NEPA) regulations published by the Council on Environmental Quality (CEQ) (40 CFR 1500-1508) and implementing procedures of DOE (10 CFR 1021). Western is the lead federal agency responsible for preparing the EA. The Department of Interior's (DOI) Bureau of Land Management (BLM) Kingman Field Office and Reclamation's Lower Colorado Regional Office are cooperating

425

XIII.1-Draft ATTACHMENT XIII  

E-Print Network [OSTI]

XIII.1-Draft ATTACHMENT XIII Review of Fischer-Tropsch Work by Statoil Three patents on Fischer are summarized below (XIII.1-XIII.3). These individuals summarize the background for their invention. Anderson amount (0.1 - 5%, preferably 0.1 to 2 wt.%) of a metal #12;XIII.3-Draft oxide promoter in addition

Kentucky, University of

426

EA-1916: DOE Notice of Availability of a Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

6: DOE Notice of Availability of a Draft Environmental 6: DOE Notice of Availability of a Draft Environmental Assessment EA-1916: DOE Notice of Availability of a Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal Energy Project (FERC Project No. 12711-005), which would be located in Cobscook Bay in Washington County, Maine, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy

427

EA-1916: DOE Notice of Availability of a Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

916: DOE Notice of Availability of a Draft Environmental 916: DOE Notice of Availability of a Draft Environmental Assessment EA-1916: DOE Notice of Availability of a Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Ocean Renewable Power Company, LLC's application for an 8-year pilot license for the proposed Cobscook Bay Tidal Energy Project (FERC Project No. 12711-005), which would be located in Cobscook Bay in Washington County, Maine, and has prepared an environmental assessment (EA) in cooperation with the U.S. Department of Energy

428

EIS-0333: Draft Environmental Impact Statement | Department of...  

Office of Environmental Management (EM)

EIS-0333: Draft Environmental Impact Statement EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington This Draft Environmental...

429

EIS-0288-S1: Draft Supplemental Environmental Impact Statement...  

Energy Savers [EERE]

Draft Supplemental Environmental Impact Statement EIS-0288-S1: Draft Supplemental Environmental Impact Statement Production of Tritium in a Commercial Light Water Reactor The Draft...

430

EIS-0451: Hooper Springs Project, Caribou County, Idaho | Department of  

Broader source: Energy.gov (indexed) [DOE]

1: Hooper Springs Project, Caribou County, Idaho 1: Hooper Springs Project, Caribou County, Idaho EIS-0451: Hooper Springs Project, Caribou County, Idaho Summary This EIS evaluates the environmental impacts of DOE's Bonneville Power Administration's proposal to construct, operate, and maintain a single-circuit, 115-kilovolt (kV) transmission line and a 138/115-kV substation (collectively referred to as the Hooper Springs Project). The new substation would be located adjacent to PacifiCorp's existing 345/138-kV Threemile Knoll Substation, located near the City of Soda Springs in Caribou County, Idaho. Public Comment Opportunities None available at this time. Documents Available for Download March 11, 2013 EIS-0451: Draft Environmental Impact Statement Hooper Springs Project, Caribou County, Idaho March 8, 2013

431

Draft Innovative Exploration Technologies Needs Assessment  

Broader source: Energy.gov [DOE]

A draft needs assessment for the Geothermal Technologies Programs Innovative Exploration Technologies Subprogram.

432

EIS-0222: Draft Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan

433

Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

434

EIS-0310: Draft Programmatic Environmental Impact Statement | Department of  

Broader source: Energy.gov (indexed) [DOE]

10: Draft Programmatic Environmental Impact Statement 10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, the DOE is responsible for ensuring the availability of isotopes for medical, industrial and research applications, meeting the nuclear material needs of other Federal agencies, and undertaking research and development activities related to development of nuclear power for civilian use. To meet these responsibilities, DOE maintains nuclear infrastructure capabilities that support various missions. Current estimates for the future needs of medical and industrial isotopes, plutonium-238, and research requirements indicate that the current infrastructure may soon be insufficient to meet the projected demands. DOE proposes to enhance these

435

EA-1939: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9: Draft Environmental Assessment 9: Draft Environmental Assessment EA-1939: Draft Environmental Assessment Center for Commercialization of Electronic Technology, Reese Technology Center Wind and Battery Integration Project, Lubbock County, TX This EA evaluates the potential environmental consequences of providing a financial assistance grant under the American Recovery and Reinvestment Act of 2009 (Recovery Act; Public Law 111-5, 123 Stat. 115) to the Center for Commercialization of Electric Technology to demonstrate battery technology integration with wind generated electricity by deploying and evaluating utility-scale lithium battery technology to improve grid performance and thereby aid in the integration of wind generation into the local electricity supply. EA-1939-DEA-2012.pdf More Documents & Publications

436

EA-1752: Draft Environmental Assessment | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

52: Draft Environmental Assessment 52: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

437

EA-1642S: Supplemental Draft Environmental Assessment | Department of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment EA-1642S: Supplemental Draft Environmental Assessment Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch Synthesis, Lexington, Kentucky This EA evaluates the potential environmental impacts of DOE providing financial assistance to the University of Kentucky (UK) Center for Applied Energy Research (CAER) to partially fund the completion of the design, construction and operation of a small-scale pilot plant for research related to the gasification of coal and coal-biomass blends and conversion of derived syngas to liquid fuels via Fischer-Tropsch (FT) synthesis. This project is intended to evaluate the commercial and technical viability of

438

EA-1860: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 9/2/2011 Submit comments to: Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce, Wisconsin Economic Development Corporation (WEDC) under the State Energy Program (SEP). WEDC is seeking to provide a $3.5 million SEP loan to Richland Center Renewable Energy (RCRE). These funds would be used to purchase equipment for an anaerobic digester located at a new wastewater treatment facility. Before DOE decides whether

439

EA-1752: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

752: Draft Environmental Assessment 752: Draft Environmental Assessment EA-1752: Draft Environmental Assessment Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase and Temporary Site Facilities, Kings Island, San Joaquin County, California This EA evaluates the potential environmental impacts of DOE providing a financial assistance grant based on the American Recovery and Reinvestment Act of 2009 (ARRA) to PG&E in a cooperative agreement between PG&E and DOE. The project is co-funded by the federal DOE, California Public Utilities Commission, and the California Energy Commission. If PG&E receives the funding, the company proposes construction, operation, and closure of an injection and withdrawal well, and associated temporary site facilities

440

EA-1860: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

EA-1860: Draft Environmental Assessment EA-1860: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 9/2/2011 Submit comments to: Melissa Rossiter Department of Energy Golden Field Office 1617 Cole Blvd, Golden, CO 80401 Electronic mail: melissa.rossiter@go.doe.gov The U.S. Department of Energy (DOE) has provided Federal funding to the Wisconsin Department of Commerce, Wisconsin Economic Development Corporation (WEDC) under the State Energy Program (SEP). WEDC is seeking to provide a $3.5 million SEP loan to Richland Center Renewable Energy (RCRE). These funds would be used to purchase equipment for an anaerobic digester located at a new wastewater treatment facility. Before DOE decides whether

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

EIS-0460: Draft Environmental Impact Statement | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0460: Draft Environmental Impact Statement FutureGen 2.0 Project, Meredosia, Illinois This EIS evaluates the environmental impacts of a proposal to provide approximately $1 billion in Federal funding (most of it appropriated by the American Recovery and Reinvestment Act) for the FutureGen 2.0 program. The FutureGen 2.0 program would provide financial assistance for the repowering of an existing electricity generator with clean coal technologies integrated with a pipeline that would transport carbon dioxide to a sequestration site where it would be injected and stored in a deep geologic formation. EIS-0460-DEIS-Summary-2013.pdf EIS-0460-DEIS-Volume_I-2013.pdf EIS-0460-DEIS-Volume_II-2013.pdf More Documents & Publications

442

EA-1901: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1: Draft Environmental Assessment 1: Draft Environmental Assessment EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This EA evaluates the environmental impacts of a proposal for DOE's Bonneville Power Administration to support the Kootenai Tribe of Idaho's construction of a new hatchery on property owned by the Tribe at the confluence of the Moyie and Kootenai Rivers, approximately eight miles upstream from Bonners Ferry, Idaho. The proposed location of the new hatchery facility is currently the site of the Twin Rivers Canyon Resort. EA-1901-DEA-2013.pdf More Documents & Publications EA-1901: Final Environmental Assessment EA-1901: Finding of No Significant Impact EA-1901: Mitigation Action Plan

443

EA-1851: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1851: Draft Environmental Assessment Delphi Automotive Systems, LLC, Electric Drive Vehicle Battery and Component Manufacturing Initiative For more information, contact: Ms. Pierina Fayish U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940, MS: 922-M217 Pittsburgh, PA 15236 Fax: 412-386-4775 Electronic mail: pierina.fayish@netl.doe.gov DOE prepared this EA to evaluate the potential environmental consequences of providing a financial assistance grant under the American Recovery andReinvestment Act of 2009 (ARRA) to Delphi Automotive Systems, Limited Liability Corporation (LLC) (Delphi). Delphi proposes to construct a laboratoryreferred to as the "Delphi Kokomo, IN Corporate Technology Center" (Delphi CTC Project) and retrofit a manufacturing facility. The

444

EIS-0407: Draft Environmental Impact Statement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0407: Draft Environmental Impact Statement Abengoa Biorefinery Project Near Hugoton, Stevens County, Kansas DOE's Proposed Action is to provide federal funding to Abengoa Bioenergy Biomass of Kansas, LLC (Abengoa Bioenergy) to support the design, construction, and startup of a commercial-scale integrated biorefinery to be located near the city of Hugoton, Stevens County, Kansas. If DOE decides to provide federal funding, it would negotiate an agreement with Abengoa Bioenergy to provide approximately $85 million of the total anticipated cost of approximately $300 million (2008 dollars). The biorefinery would use lignocellulosic biomass (corn stover, wheat straw) as feedstock to produce ethanol and biopower (electricity) sufficient to meet the needs of

445

EA-1823: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Assessment Draft Environmental Assessment EA-1823: Draft Environmental Assessment Rockford Solar Energy Project, Chicago-Rockford Airport, Winnebago County, Illinois For more information contact: Mr. John Jediny, NEPA Document Manager Office of Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Telephone: 202-287-5380 Fax: 202-340-9260 Electronic mail: John.Jediny@ee.doe.gov Public Hearing: Date: Monday, October 24, 2011; Time: 4 p.m. to 7 p.m. Location: Auditorium at the Offices of the Greater Rockford Airport Authority, 60 Airport Drive, Rockford, Illinois, 61109 DOE's proposed action would authorize Federal funding to the Illinois Department of Commerce and Economic Opportunity under the State Energy Program.

446

EA-1697: Draft Environmental Assessment | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7: Draft Environmental Assessment 7: Draft Environmental Assessment EA-1697: Draft Environmental Assessment Right-of-Way Maintenance in the San Joaquin Valley, California The Western Area Power Administration (Western) Sierra Nevada Region is a power marketing administration of the U.S. Department of Energy (DOE). As a Federal entity, Western is responsible for examining the potential environmental consequences of its proposed actions prior to making a decision or commitment to implement an action (see Section 1.5 for more information). This Environmental Assessment (EA) evaluates environmental impacts of the Proposed Action (San Joaquin Valley Right-of-Way Maintenance Project) and the No Action Alternative. EA-1697-DEA-2010.pdf More Documents & Publications EA-1697: Final Environmental Assessment

447

EA-1890: DOE Notice of Availability of the Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Draft Environmental Assessment EA-1890: DOE Notice of Availability of the Draft Environmental Assessment Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Notice of Availability of Environmental Assessment: Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon (December 2010)

448

GRR/Elements/14-CA-c.8 to 14-CA-c.9 - Public Notice and Comment on Draft  

Open Energy Info (EERE)

GRR/Elements/14-CA-c.8 to 14-CA-c.9 - Public Notice and Comment on Draft GRR/Elements/14-CA-c.8 to 14-CA-c.9 - Public Notice and Comment on Draft Project Approval Letter and Public Hearing (If Significant Amount of Comments) < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-c.8 to 14-CA-c.9 - Public Notice and Comment on Draft Project Approval Letter and Public Hearing (If Significant Amount of Comments) The State Board posts the Draft Project Approval Letter for public comment. If the State Board receives a significant amount of comments on the Draft Project Approval Letter, the State Board will hold a public hearing on the Draft Project Approval Letter. Logic Chain No Parents \V/ GRR/Elements/14-CA-c.8 to 14-CA-c.9 - Public Notice and Comment on Draft

449

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Broader source: Energy.gov (indexed) [DOE]

440: DOE and EPA Notice of Availability of a Draft 440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

450

EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental  

Broader source: Energy.gov (indexed) [DOE]

40: DOE and EPA Notice of Availability of a Draft 40: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0440: DOE and EPA Notice of Availability of a Draft Environmental Impact Statement Quartzsite Solar Energy Project and Proposed Yuma Field Office Resource Management Plan Amendment, La Paz County, Arizona (November 2011) Comment Period Ended: 02/10/12 For more information: Ms. Liana Reilly NEPA Document Manager Western Area Power Administration P.O. Box 281213 Lakewood, CO 80228-8213 Electronic mail: QuartzsiteSolarEIS@wapa.gov Western Power Administration (Western) and the Bureau of Land Management (BLM) have prepared a Draft Environmental Impact Statement for the proposed Quartzsite Solar Energy Project, in La Paz County, Arizona, and the proposed amendment to the Yuma Field Office Resource Management Plan, and are

451

EIS-0226: DOE Notice of Availability of the Revised Draft Environmental  

Broader source: Energy.gov (indexed) [DOE]

6: DOE Notice of Availability of the Revised Draft 6: DOE Notice of Availability of the Revised Draft Environmental Impact Statement EIS-0226: DOE Notice of Availability of the Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center The U.S. Department of Energy (DOE) and the New York State Energy Research and Development Authority (NYSERDA) are announcing their intent to prepare an Environmental Impact Statement (EIS) for Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project (WVDP) and Western New York Nuclear Service Center (also known as the ''Center''). DOE/EIS-0226, Notice of Availability of the Revised Draft Environmental Impact Statement for Decommissioning and/or Long-Term Stewardship at the

452

EIS-0340: EPA Notice of Availability of the Draft Environmental Impact  

Broader source: Energy.gov (indexed) [DOE]

EPA Notice of Availability of the Draft Environmental EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0340: EPA Notice of Availability of the Draft Environmental Impact Statement NE Oregon Hatchery Program: Grande Ronde Imnaha Spring Chinook Project DOE/EIS-0340, Northeast Oregon Hatchery Program, Grande Ronde-Imnaha Spring Chinook Hatchery Project, To Modify and Modernize two Existing Hatchery Facilities and Construct three Auxiliary Hatchery Facilities, Wallowa County, Oregon, 68 FR 28213 (May 2003) More Documents & Publications EIS-0236-S2: EPA Notice of Availability of the Draft Supplement to the Programmatic Environmental Impact Statement EIS-0318: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0336: EPA Notice of Availability of the Final Environmental Impact

453

EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali  

Broader source: Energy.gov (indexed) [DOE]

EIS-0365: Draft Environmental Impact Statement for the EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004) EIS-0365: Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines, EIS-0365 (May 2004) A U.S. Department of Energy (DOE) Presidential permit is required to construct an electric transmission line across the U.S. international border. On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico

454

DOE/EA-1596: Finding of No Significant Impact for Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota (02/18/09)  

Broader source: Energy.gov (indexed) [DOE]

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION UPPER GREAT PLAINS CUSTOMER SERVICE REGION FINDING OF NO SIGNIFICANT IMPACT Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota DOEIEA-1596 AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) ACTION: Finding of No Significant Impact SUMMARY: Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation. Under its Open Access Transmission Service Tariff (Tariff), Western is required to respond to Basin's interconnection requests. Western's Tariff

455

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Broader source: Energy.gov (indexed) [DOE]

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

456

Attachment 2: Draft Settlement Agreement  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-3621 POWER SERVICES January 28, 2009 DRAFT In reply refer to: Contract No. 09PB-...

457

California Energy Commission STAFF DRAFT  

E-Print Network [OSTI]

California Energy Commission STAFF DRAFT 20142015 INVESTMENT PLAN UPDATE FOR THE ALTERNATIVE AND RENEWABLE FUEL AND VEHICLE TECHNOLOGY PROGRAM OCTOBER 2013 CEC6002013003SD CALIFORNIA ENERGY COMMISSION Edmund G. Brown Jr., Governor #12;CALIFORNIA ENERGY COMMISSION Charles Smith Primary

458

Nuclear Waste Disposal Plan Drafted  

Science Journals Connector (OSTI)

Nuclear Waste Disposal Plan Drafted ... Of all the issues haunting nuclear power plants, that of disposing of the radioactive wastes and spent nuclear fuel they generate has been the most vexing. ...

1984-01-09T23:59:59.000Z

459

Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

460

EA-1890: DOE Notice of Availability of the Draft Environmental Assessment |  

Broader source: Energy.gov (indexed) [DOE]

EA-1890: DOE Notice of Availability of the Draft Environmental EA-1890: DOE Notice of Availability of the Draft Environmental Assessment EA-1890: DOE Notice of Availability of the Draft Environmental Assessment Reedsport OPT Wave Park, LLC Project No. 12713-002 Oregon In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's) regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed Reedsport OPT Wave Park, LLC's application for license for the Reedsport OPT Wave Park Project (FERC Project No. 12713-002), which would be located in Oregon State territorial waters about 2.5 nautical miles off the coast near Reedsport, in Douglas County, Oregon. Notice of Availability of Environmental Assessment: Reedsport OPT Wave

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

EA-1909: South Table Wind Project, Kimball County, NE | Department of  

Broader source: Energy.gov (indexed) [DOE]

09: South Table Wind Project, Kimball County, NE 09: South Table Wind Project, Kimball County, NE EA-1909: South Table Wind Project, Kimball County, NE Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed South Table Wind Project, which would generate approximately 60 megawatts from about 40 turbines, to Western's existing Archer-Sidney 115-kV Transmission Line in Kimball County, Nebraska. Public Comment Opportunities None available at this time. Documents Available for Download August 28, 2012 EA-1909: Finding of No Significant Impact South Table Wind Project, Kimball County, NE July 16, 2012 EA-1909: Final Environmental Assessment South Table Wind Project, Kimball County, NE February 29, 2012 EA-1909: Draft Environmental Assessment

462

Discussion Draft of the Preliminary Cybersecurity Framework Discussion Draft of the Preliminary  

E-Print Network [OSTI]

1 Discussion Draft of the Preliminary Cybersecurity Framework Discussion Draft of the Preliminary Cybersecurity Framework August 28, 2013 #12;5 10 15 20 25 30 35 Discussion Draft of the Preliminary Cybersecurity Framework 2 3 A Discussion Draft of the Preliminary Cybersecurity Framework for improving critical

Bentz, Dale P.

463

Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop  

SciTech Connect (OSTI)

In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project teams work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASCs Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

Galarowicz, James

2014-01-06T23:59:59.000Z

464

Microsoft Word - GrapevineDraftEIS 070810.doc  

Broader source: Energy.gov (indexed) [DOE]

Draft Environmental Impact Statement Draft Environmental Impact Statement Grapevine Canyon Wind Project July 2010 Lead Agency: U.S. Department of Energy, Western Area Power Administration Cooperating Agencies: U.S. Department of Agriculture, Forest Service, Coconino National Forest Arizona State Land Department Volume I AREA POWER ADMINISTRATION Grapevine Canyon Wind Project - Environmental Impact Statement DOCUMENT CONTENTS VOLUME I Cover Sheet Executive Summary: Introduction; Purpose and Need for Agency Action; Proposed Action and Alternatives; Public Involvement, Consultation, and Coordination; Summary of Resource Protection Measures and Potential Impacts Front Matter: Table of Contents, List of Figures and Tables, Index, Acronyms and Units of Measure Chapter 1: Purpose and Need Chapter 2: Proposed Action and Alternatives

465

SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet.  

Broader source: Energy.gov [DOE]

Fact sheet describes the ThunderPower hydrogen fuel cell bus that was demonstrated at SunLine Transit Agency from November 2002 to February 2003. The bus was evaluated by DOEs Advanced Vehicle Testing Activity.

466

The Use and Benefits of Video Inspection in Lined and Unlined Ductwork in IAQ Surveys and "Source Removal" Cleaning Projects  

E-Print Network [OSTI]

New technology has developed video equipment capable of inspecting interior lined and unlined ductwork. Where IAQ (Indoor Air Quality) questions require inspections of suspicious air conveyance systems. Video recordings provide useful information...

Kiec, T. M.

467

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington  

Broader source: Energy.gov [DOE]

The Bureau of Land Management is preparing, with DOEs Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPAs proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

468

Memorandum: Cost-effectiveness valuation framework for Demand Response Resources: Guidelines and Suggestions (DRAFT)  

E-Print Network [OSTI]

Memorandum: Cost-effectiveness valuation framework for Demand Response Resources: Guidelines and Suggestions (DRAFT) To: Pacific Northwest Demand Response Project Cost-Effectiveness Working Group From: Chuck Northwest Demand Response Project agreed to form three Working Groups to explore DR issues in more detail

469

The photospheric solar oxygen project: II. Non-concordance of the oxygen abundance derived from two forbidden lines  

E-Print Network [OSTI]

In the Sun, the two forbidden [OI] lines at 630 and 636 nm were previously found to provide discrepant oxygen abundances. aims: We investigate whether this discrepancy is peculiar to the Sun or whether it is also observed in other stars. method: We make use of high-resolution, high signal-to-noise ratio spectra of four dwarf to turn-off stars, five giant stars, and one sub-giant star observed with THEMIS, HARPS, and UVES to investigate the coherence of the two lines. results: The two lines provide oxygen abundances that are consistent, within observational errors, in all the giant stars examined by us. On the other hand, for the two dwarf stars for which a measurement was possible, for Procyon, and for the sub-giant star Capella, the 636 nm line provides systematically higher oxygen abundances, as already seen for the Sun. conclusions: The only two possible reasons for the discrepancy are a serious error in the oscillator strength of the NiI line blending the 630 nm line or the presence of an unknown blend in...

Caffau, Elisabetta; Malherbe, Jean-M; Bonifacio, Piercarlo; Steffen, Matthias; Monaco, Lorenzo

2013-01-01T23:59:59.000Z

470

Accelerating Cleanup: Focus on 2006. Discussion draft  

SciTech Connect (OSTI)

This executive summary addresses the activities associated with the National Transuranic (TRU) Program managed by the Carlsbad Area Office (CAO). The CAO programmatically reports to the Assistant Secretary for Environmental Management and receives administrative support through the Albuquerque Operations Office. The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant for site disposal of TRU waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to the CAO, the Waste Isolation Pilot Plant (WIPP) site operations, and other activities associated with the National TRU Program. The CAO develops and directs implementation of the program, while the DOE Headquarters establishes policy and guidelines. The CAO assesses compliance with the program guidance, as well as the commonality of activities and assumptions among all the sites. Since the development of the February 28, 1997, database used to develop this Discussion Draft, the opening of the WIPP facility for receipt of Contact Handled waste has been delayed from November 1997 to May 1998. This slippage is significant enough to require a change in the milestones and volumes included in the documents to be reviewed by our stakeholders. Changes have been incorporated into this Discussion Draft and its supporting Project Baseline Summaries (PBSs).

None

1997-06-01T23:59:59.000Z

471

EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft  

Broader source: Energy.gov (indexed) [DOE]

-S1: EPA Notice of Availability of the Supplement to the -S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is EIS-0403D-S1. Comment Period Ends: 01/27/12 Comments may be submitted to: Solar Energy Draft PEIS Argonne National Laboratory 9700 S. Cass Avenue--EVS/240 Argonne, Illinois 60439 Web site: DOE and BLM recommend using the online comment form available on the project Web site: http://solareis.anl.gov. EIS-0403-DEIS_EPA_NOA-2011.pdf More Documents & Publications EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact

472

EIS-0496: Notice of Intent to Prepare a Draft Environmental Impact  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6: Notice of Intent to Prepare a Draft Environmental Impact 6: Notice of Intent to Prepare a Draft Environmental Impact Statement EIS-0496: Notice of Intent to Prepare a Draft Environmental Impact Statement DOE's Western Area Power Administration announces its intent to prepare, with the Bureau of Reclamation as a cooperating agency, a joint EIS and environmental impact report to evaluate the potential environmental impacts of the proposed interconnection of certain San Luis Unit facilities to Western's Central Valley Project Transmission System. For the purposes of the environmental impact report under the California Environmental Quality Act (CEQA), the San Luis & Delta-Mendota Water Authority is the lead agency. EIS-0496: Notice of Intent More Documents & Publications EIS-0323: Draft Environmental Impact Statement

473

EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental  

Broader source: Energy.gov (indexed) [DOE]

08: DOE Notice of Availability of a Programmatic Draft 08: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE announces the availability of the EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-DOE-NOA-2013.pdf

474

EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DOE Notice of Availability of a Programmatic Draft DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement EIS-0408: DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE Notice of Availability of a Programmatic Draft Environmental Impact Statement DOE announces the availability of the EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts of wind energy development in Iowa, Minnesota, Montana, Nebraska, North Dakota, and South Dakota - Western's Upper Great Plains customer service region. Western will use the EIS to implement a comprehensive regional program to manage interconnection requests for wind energy projects. EIS-0408-DEIS-DOE-NOA-2013.pdf

475

Draft Environmental Assessment on the Remote-handled Waste Disposition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Draft Environmental Assessment on the Remote-handled Waste Disposition Project available for public review and comment Draft Environmental Assessment on the Remote-handled Waste Disposition Project available for public review and comment The U.S. Department of Energy invites the public to review and comment on a draft environmental assessment that the Department issued today, for a proposal to process approximately 327 cubic meters of remote-handled waste currently stored at the Idaho National Laboratory. An additional five cubic meters of waste stored at the Hanford Site near Richland, Washington is also evaluated since it is reasonably foreseeable that a decision may be made in the future to send that waste to Idaho for treatment. The project is necessary to prepare the waste for legally-required disposal. Under the Department�s preferred alternative, workers would use sealed rooms called hot cells at the Idaho Nuclear Technology and Engineering Center (INTEC) to process the waste, treat it as necessary and repackage it so that it is ready for disposal. The document describes the modifications necessary to hot cells to perform the work.

476

BPA releases I-5 Corridor Reinforcement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RELEASE Tuesday, Nov. 13, 2012 CONTACT: Doug Johnson, 503-230-5840 or 503-230-5131 BPA releases I-5 Corridor Reinforcement Project Draft EIS and preferred alternative...

477

PGE_CAES_Draft EA_main_11.15.13  

Broader source: Energy.gov (indexed) [DOE]

52D 52D DRAFT ENVIRONMENTAL ASSESSMENT FOR THE PACIFIC GAS AND ELECTRIC COMPANY (PG&E) COMPRESSED AIR ENERGY STORAGE (CAES) COMPRESSION TESTING PHASE PROJECT, SAN JOAQUIN COUNTY, CALIFORNIA U.S. Department of Energy National Energy Technology Laboratory November 2013 DOE/EA-1752D DRAFT ENVIRONMENTAL ASSESSMENT FOR THE PACIFIC GAS AND ELECTRIC COMPANY (PG&E) COMPRESSED AIR ENERGY STORAGE (CAES) COMPRESSION TESTING PHASE PROJECT, SAN JOAQUIN COUNTY, CALIFORNIA U.S. Department of Energy National Energy Technology Laboratory November 2013 COVER SHEET Responsible Agency: U.S. Department of Energy (DOE) Title: Draft Environmental Assessment for the Pacific Gas and Electric Company (PG&E) Compressed Air Energy Storage (CAES) Compression Testing Phase Project, San

478

EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental  

Broader source: Energy.gov (indexed) [DOE]

-S1: DOE Notice of Availability of the Draft Supplemental -S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings EIS-0350-S1: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statement and Notice of Public Hearings Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project NNSA, a semiautonomous agency within DOE, proposes to complete the Chemistry and Metallurgy Research Building Replacement (CMRR) Project at Los Alamos National Laboratory (LANL) by constructing the nuclear facility portion (CMRR-NF) of the CMRR Project to provide the analytical chemistry and materials characterization capabilities currently or previously performed in the existing Chemistry and Metallurgy Research (CMR) Building.

479

EIS-0377: Big Stone II Power Plant and Transmission Project | Department of  

Broader source: Energy.gov (indexed) [DOE]

7: Big Stone II Power Plant and Transmission Project 7: Big Stone II Power Plant and Transmission Project EIS-0377: Big Stone II Power Plant and Transmission Project SUMMARY A systems study was carried out to identify the most appropriate locations to interconnect the proposed Big Stone II power plant to the regional utility grid. The study also identified transmission line and substation upgrades and modifications that would be required to support the addition of 600 MW of capacity within the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 24, 2009 EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project June 1, 2009 EIS-0377: Final Environmental Impact Statement Big Stone II Power Plant and Transmission Project October 26, 2007 EIS-0377: Supplemental Draft Environmental Impact Statement

480

EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration so that WAPA could supplement it in support of WAPAs National Environmental Policy Act requirements for a related project.

Note: This page contains sample records for the topic "line project draft" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line  

Broader source: Energy.gov (indexed) [DOE]

S-1 S-1 Summary This summary covers the major points of the draft environmental impact statement (DEIS) prepared for the Rebuild of the Libby (FEC) to Troy Section of Bonneville Power Administration's Libby to Bonners Ferry 115-kilovolt Transmission Line Project (Libby-Troy Project). This DEIS was prepared by Bonneville Power Administration (BPA). The project would include rebuilding a 17-mile section of an existing BPA transmission line located between Libby and Troy, Montana. S.1 Purpose of and Need for Action Historically, BPA has served electrical loads in northwestern Montana and northern Idaho with transmission facilities from Libby Dam east of Libby, Montana through Bonners Ferry Substation west of Bonners Ferry, Idaho to Albeni Falls Dam near the Idaho-Washington border (Figure S-1). These

482

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

483

Drifting absence :: drafting memory  

E-Print Network [OSTI]

The emotive power of a memorial derives from its ability to engage the viewer in active remembrance. The project considers the limitations of a monumentality which embraces a distinct division between viewer and memorial. ...

Kuhn, Marlene Eva

2006-01-01T23:59:59.000Z

484

PV Manufacturing R&D Project Status and Accomplishments Under 'In-Line Diagnostics and Intelligent Processing' and 'Yield, Durability and Reliability'  

SciTech Connect (OSTI)

The PV Manufacturing R&D (PVMR&D) Project conducts cost-shared research and development programs with U.S. PV industry partners. There are currently two active industry partnership activities. 'In-line Diagnostics and Intelligent Processing', launched in 2002, supports development of new in-line diagnostics and monitoring with real-time feedback for optimal process control and increased yield in the fabrication of PV modules, systems, and other system components. 'Yield, Durability and Reliability', launched in late 2004, supports enhancement of PV module, system component, and complete system reliability in high-volume manufacturing. A second key undertaking of the PVMR&D Project is the collection and analysis of module production cost-capacity metrics for the U.S. PV industry. In the period from 1992 through 2005, the average module manufacturing cost in 2005 dollars fell 54% (5.7% annualized) to $2.73/Wp, and the capacity increased 18.5-fold (25% annualized) to 251 MW/yr. An experience curve analysis gives progress ratios of 87% and 81%, respectively, for U.S. silicon and thin-film module production.

Friedman, D. J.; Mitchell, R. L.; Keyes, B. M.; Bower, W. I.; King, R.; Mazer, J. A.

2006-01-01T23:59:59.000Z

485

XII.1-Draft ATTACHMENT XII  

E-Print Network [OSTI]

XII.1-Draft ATTACHMENT XII Review of Fischer-Tropsch Work by Gulf Oil The Gulf-Badger process leads analysis conducted by Gulf Oil, and later the process and engineering design provided by Badger (XII.1). A simplified process scheme is shown in XII.1 (XII.2). The process was first discovered from exploratory work

Kentucky, University of

486

APPLIED THERMAL ENGINEERING Manuscript Draft  

E-Print Network [OSTI]

the heat pump from the grid during the two hours of electrical peak power · Design of a new heat exchangerAPPLIED THERMAL ENGINEERING Manuscript Draft TITLE: Experimental assessment of a PCM to ai