National Library of Energy BETA

Sample records for line project bonneville

  1. Bonneville upgrades lines

    SciTech Connect (OSTI)

    Not Available

    1993-08-30

    A stretch of Bonneville Power Administration transmission line between Spokane and the Grand Coulee Dam is an 82-mile bottleneck as it is the last 115-kv section of [open quotes]road[close quotes] along a 500-kv transmission [open quotes]highway[close quotes]. Soon the administration will change all that. A number of independent and utility powerplants have been proposed in Idaho, Montana and the Spokane, Wash., area during the 1990s. As the operators will need to move their power, Bonneville is planning to build a $144-million, 500-kv line to upgrade the 115-kv section. The agency is planning to use its existing right-of-way.

  2. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    81: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River ...

  3. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

  4. Bonneville Project: CFD of the Spillway Tailrace

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

    2012-11-19

    US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

  5. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...

    Energy Savers [EERE]

    Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental...

  6. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  7. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...

    Energy Savers [EERE]

    No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the...

  8. the Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration deposited 12, 535,000 to the reclamation fund in the United States Treasury for the ac- count of Columbia Basin Project, Yakima Project...

  9. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  10. Lane-Wendson No. 1 Transmission Line Rebuild Project

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lane-Wendson No. 1 Transmission Line Rebuild Project Finding of No Significant Impact and Floodplain and Wetland Statement of Findings 1 In cooperation with the Bureau of Land Management Lane-Wendson No. 1 Transmission Line Rebuild Project Finding of No Significant Impact and Floodplain and Wetland Statement of Findings DEPARTMENT OF ENERGY Bonneville Power Administration DOE/EA-1952 April 2016 _____________________________________________________________________________________________________

  11. Bonneville_Power_Administration

    Office of Environmental Management (EM)

    Hooper Springs Transmission Project 1 Record of Decision March 2015 Bonneville Power Administration's Hooper Springs Transmission Project Record of Decision March 2015 Decision Bonneville Power Administration (BPA) has decided to construct and operate the Hooper Springs Transmission Project in Caribou County, Idaho. As described in the Hooper Springs Transmission Project Final Environmental Impact Statement (DOE/EIS-0451, January 2015), this project consists of: (1) a new 138/115-kilovolt (kV)

  12. EA-1002: Bonneville Power Administration's Hot Springs- Garrison Fiber Optic Project, Montana

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to upgrade its operational telecommunications system between the Hot...

  13. EA-0956: South Fork Snake River/Palisades Wildlife Mitigation Project, Bonneville County, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration proposal to fund the implementation of the South Fork Snake River Programmatic...

  14. City of North Bonneville, Washington: Geothermal Exploration Project, production test well, Phase II. Final report

    SciTech Connect (OSTI)

    Not Available

    1982-06-01

    Based on discussions with the City of North Bonneville, the production test well was drilled to a depth that would also explore for ground water temperatures near 130/sup 0/F (54.4/sup 0/C). Depth projections to a 130/sup 0/F bottom hole temperature were made by assuming a constant ground water temperature rise greater than 50/sup 0/C per kilometer, and by assuming that essentially homogeneous or equivalent conductive rock units would be encountered. Minimum water production requirements were not set, although the City determined that about 800 gpm would be acceptable. Large upper casing diameters of 16 and 12 inches were installed in order to provide the future use of either a vertical turbine or submersible pump, as desired by the city. The scope of work included interpretation of well characteristics, evaluation of ground water as a geothermal resource, geologic analysis of data from drilling and testing, drilling supervision, daily drilling cost accounting, and preparation of a final report. The report includes geologic evaluation of the drilling and test data, ground water and geothermal potential.

  15. EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high-voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

  16. EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

    Broader source: Energy.gov [DOE]

    This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

  17. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild Project; Lane

    Energy Savers [EERE]

    County, Oregon | Department of Energy 1967: Hills Creek-Lookout Point Transmission Line Rebuild Project; Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild Project; Lane County, Oregon Summary Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115-kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane

  18. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 2013 (Revised 060914) United States Department of Energy Bonneville Power Administration 905 N.E. 11th Avenue Portland, OR 97232 Bonneville Power Administration's 2014...

  19. 2014 Annual Planning Summary for the Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Bonneville Power Administration.

  20. 2012 Annual Planning Summary for Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Bonneville Power Administration.

  1. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  2. EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

  3. McNary-John Day Transmission Line Project Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-03-08

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

  4. U. S. DEPARTMENT OF THE INTERIOR * BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration deposited 12,535,000 to the rechunation fund in the United States Treasury for the ac- count of Columbia Basin Project. Yakima Project...

  5. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    agreement (Agreement) between the BC Hydro and Power uthority (BCH) and the Bonneville Power Administration (BP A), jointly the Parties, which BA for accounting purposes is...

  6. Accident Investigation of the July 30, 2013, Electrical Fatality on the Bandon-Rogue No. 1 115kV Line at the Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Level I Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Level I Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting.

  7. Northwest, the Bonneville Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    voltage power lines that move large amounts of power from hydroelectric projects and power plants to urban centers hundreds of miles away. To keep the electricity flowing safely...

  8. McNary-John Day Transmission Line Project, Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-30

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS

  9. 2013 Annual Planning Summary for the Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Bonneville Power Administration.

  10. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1,NT OF Bonneville Power Administration P.O Box 3621 Portland, Oregon 97208-3621 PUBLIC AFFAIRS March 10, 2010 In reply refer to: DK-7 Tom Jacobs Ex RE: BPA-2010-01030-F Dear Mr....

  11. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect (OSTI)

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  12. Computational Fluid Dynamics Modeling of the Bonneville Project: Tailrace Spill Patterns for Low Flows and Corner Collector Smolt Egress

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Perkins, William A.

    2010-12-01

    In 2003, an extension of the existing ice and trash sluiceway was added at Bonneville Powerhouse 2 (B2). This extension started at the existing corner collector for the ice and trash sluiceway adjacent to Bonneville Powerhouse 2 and the new sluiceway was extended to the downstream end of Cascade Island. The sluiceway was designed to improve juvenile salmon survival by bypassing turbine passage at B2, and placing these smolt in downstream flowing water minimizing their exposure to fish and avian predators. In this study, a previously developed computational fluid dynamics model was modified and used to characterized tailrace hydraulics and sluiceway egress conditions for low total river flows and low levels of spillway flow. STAR-CD v4.10 was used for seven scenarios of low total river flow and low spill discharges. The simulation results were specifically examined to look at tailrace hydraulics at 5 ft below the tailwater elevation, and streamlines used to compare streamline pathways for streamlines originating in the corner collector outfall and adjacent to the outfall. These streamlines indicated that for all higher spill percentage cases (25% and greater) that streamlines from the corner collector did not approach the shoreline at the downstream end of Bradford Island. For the cases with much larger spill percentages, the streamlines from the corner collector were mid-channel or closer to the Washington shore as they moved downstream. Although at 25% spill at 75 kcfs total river, the total spill volume was sufficient to "cushion" the flow from the corner collector from the Bradford Island shore, areas of recirculation were modeled in the spillway tailrace. However, at the lowest flows and spill percentages, the streamlines from the B2 corner collector pass very close to the Bradford Island shore. In addition, the very flow velocity flows and large areas of recirculation greatly increase potential predator exposure of the spillway passed smolt. If there is

  13. Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-02-08

    This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

  14. PIA - Bonneville Power Adminstration Ethics Helpline | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Adminstration Ethics Helpline PIA - Bonneville Power Adminstration Ethics Helpline PIA - Bonneville Power Adminstration Ethics Helpline Hosted and operated by ...

  15. CXD 4601, Line Yard Fence Project (4601)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Line Yard Fence Project (4601) Y-12 Site Office Oak Ridge, Anderson County, Tennessee The proposed action is to install fencing around the Old Line Yard to provide protected...

  16. Northern Pass Transmission Line Project Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September ...

  17. Bonneville Power Administration 1991 Annual Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-01-01

    Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

  18. Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-16

    Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would

  19. The Skycrane at the Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration August 2, 2010 - 10:44am Addthis Daniel B. Poneman Daniel B. Poneman Former Deputy Secretary of Energy What does this project do? The project is now on schedule and under budget. The Skycrane helped overcome challenging environmental conditions. It also made the work safer for workers on the ground. The project is expected to employ approximately 140 people at its peak. For a striking glimpse

  20. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

  1. PP-10 Bonneville Power Administrator | Department of Energy

    Energy Savers [EERE]

    Bonneville Power Administrator PP-10 Bonneville Power Administrator Presidential permit authorizing Bonneville Power Administrator to construct, operate, and maintain electric ...

  2. PP-36 Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration PP-36 Bonneville Power Administration Presidential Permit authorizing Bonneville Power Administration to construct, operate, and maintain electric ...

  3. PP-46 Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    Presidential Permit authorizing Bonneville Power Administration to contruct, operate, and maintain electric transmission facilities at the U.S. - Canada Border.

  4. Bonneville Power Admin | Open Energy Information

    Open Energy Info (EERE)

    Bonneville Power Administration) Jump to: navigation, search Name: Bonneville Power Admin Place: Oregon Phone Number: 1-800-282-3713 Website: www.bpa.govContactPagesdefa...

  5. Bonneville Power Administration Program Specific Recovery Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration Program Specific Recovery Plan Bonneville Power Administration Program Specific Recovery Plan PDF icon Microsoft Word - PSRP May 15 2009 BPA ...

  6. Bonneville Power Ampere Annex Z-995 Building

    High Performance Buildings Database

    Vancouver, WA The Bonneville Power Administration (BPA), a federal agency headquartered in Portland, Oregon, provides about half of the electricity used in the Pacific Northwest and operates more than three-fourths of the region's high-voltage transmission. Because BPA markets power at cost from 31 federal dams, its rates are among the least expensive electricity in the country. The Ampere Annex project is a renovation of an exisiting 60-year-old standard warehouse building located within the Ross Complex.

  7. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY ...

  8. EIS-0474: Southline Transmission Line Project; Arizona and New...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Line Project; Arizona and New Mexico EIS-0474: Southline Transmission Line Project; Arizona and New Mexico Summary The Bureau of Land Management and Western ...

  9. Reading File Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reading File Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-3621 POWER SERVICES In reply refer to: PG-5 Ms. Renata Kurschner Director, Generation Resource...

  10. Independent Oversight Review, Bonneville Power Administration Safety

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Program - March 2014 | Department of Energy Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of

  11. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    large projects once specific, pre- identified milestones have been reached. The cash flow provided by progress payments can be important to ensure large custom projects...

  12. EIS-0060: Bonneville Power Administration Proposed FY 1981 Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303–326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 7–8 existing substations.

  13. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project; Kalispell and Polson, Montana

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. The proposed action is to replace wood-pole structures and other line components and improve access roads.

  14. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (the amount paid from BPA to the customer after applying an applicable project cost cap) totaling more than 50% of a customer's rate period TOCA- based Energy Efficiency...

  15. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    projects internally with no proposals required, but it requires utilities to assume the risk of cost-effectiveness and the possibility that BPA may not provide reimbursement if...

  16. Bonneville Power Administration Overview

    Energy Savers [EERE]

    BPA Service Area Columbia Basin Federal Dams: Canadian Dams ... O N Promoting Renewable Generation * BPA has made a ... and operation of any hydroelectric project of the Columbia ...

  17. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (BPA) transmission line and right-of-way, does not belong to BPA. The record is the property of the Public Utility District Number One of Klickitat County, Washington. As the...

  18. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, ...

  19. Plains & Eastern Clean Line Project Proposal for New or Upgraded...

    Broader source: Energy.gov (indexed) [DOE]

    Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) PDF icon Update to Plains & Eastern Clean ...

  20. Categorical Exclusion Determinations: Bonneville Power Administration |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Bonneville Power Administration Categorical Exclusion Determinations: Bonneville Power Administration Categorical Exclusion Determinations issued by Bonneville Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD December 11, 2015 CX-014364: Categorical Exclusion Determination Radio Upgrades at Franklin, Nine Mile, and Walla Walla Substations CX(s) Applied: B1.19 Date: 12/11/2015 Location(s): Washington Offices(s): Bonneville Power Administration December 10, 2015

  1. Bonneville Power Administration and the Industrial Technologies Program Leverage Support to Overcome Energy Efficiency Barriers in the Northwest

    Broader source: Energy.gov [DOE]

    This case study explores how Bonneville Power Administration, a Northwest regional wholesale power provider, rethought how to encourage and promote energy efficiency projects through its utilities.

  2. EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

  3. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  4. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  5. EIS-0077-S: Bonneville Power Administration Crow Butte Slough Crossing

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate potential impacts resulting from construction of a 4,700-foot segment of the Ashe-Slatt transmission line at Crow Butte Slough, overhead on towers on the existing right-of-way. This SEIS is a supplement to DOE/EIS-0077, Ashe-Slatt (Pebble Springs) 500-kilovolt Transmission Line, originally filed as FES 75-79.

  6. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line Project; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.

  7. Proposed Southline Transmission Line Project - Volume 4 of 4...

    Office of Environmental Management (EM)

    2 Appendix J J-1 Southline Transmission Line Project Draft Environmental Impact Statement and Draft Resource Management Plan Amendment BLM LAND USE AUTHORIZATIONS 1...

  8. EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Colusa and Sutter Counties, California EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California Summary Western Area Power ...

  9. Southline Transmission Line Project - Volume 1 Front Matter

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Infrastructure Program TPE total potential effect tpy ton(s) per year UAS FTC Unmanned Aircraft Systems Flight Test Center Southline Transmission Line Project Final ...

  10. EIS-0499: Great Northern Transmission Line Project, Minnesota...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0499: Great Northern Transmission Line Project, Minnesota Summary This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to ...

  11. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  12. Independent Oversight Review, Bonneville Power Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (Independent Oversight), within the Office of Health, Safety and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. ...

  13. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the stringent requirements for accreditation set by the Right-of-Way Stewardship Council Portland, Ore. - Bonneville Power Administration was recognized recently for...

  14. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Services Portland, Ore. - The Bonneville Power Administration has selected Mike Miller to be its vice president of Engineering and Technical Services. He will begin his new...

  15. Bonneville Power Administration, Oregon Energy Northwest, Washington...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration, Oregon Energy Northwest, Washington; Wholesale Electric Primary Credit Analyst: David N Bodek, New York (1) 212-438-7969; david.bodek@standardandpo...

  16. Land Record System PIA, Bonneville Power Administration | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration (61.28 KB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  17. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 230-kV transmission line in Washington State. BPA’s proposed action is to interconnect the proposed transmission line to an existing BPA substation.

  18. PP-10-1 Bonneville Power Administrator | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -1 Bonneville Power Administrator PP-10-1 Bonneville Power Administrator Presidential ... at the U.S-Canada border. PDF icon PP-10-1 Bonneville Power Administrator More ...

  19. Bonneville Power Administration FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    has been performed on the line, all wood poles and wires must be replaced due to rot and deterioration. The proposed project would require developing temporary access roads...

  20. Audit of Bonneville Power Administration's Management of Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration's Management of Information Resources, WR-B-96-06 Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06 ...

  1. STATEMENT OF MR. ELLIOT E. MAINZER ADMINISTRATOR BONNEVILLE POWER...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Bonneville also invests to fulfill regional commitments for energy efficiency and fish and ... Fish and Wildlife Bonneville's strategy for mitigating the impact of the FCRPS on fish and ...

  2. Northern Pass Transmission Line Project Environmental Impact Statement:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 | Department of Energy Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 -

  3. EIS-0076: Bonneville Power Administration Alumax

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) developed this EIS for the proposed Alumax primary aluminum reduction plant to determine the environmental, economic and social impacts of plant construction, as well as potential power supply alternatives for BPA.

  4. BONNEVILLE POWER ADNMINSTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    annual U.S. Treasury payment on time and in full Portland, Ore. - The Bonneville Power Administration today announced that it completed its 32 nd consecutive annual payment to...

  5. EIS-0183: Bonneville Power Administration Business Plan

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration is considering how to respond to the challenges of a dynamic electric utility industry, and prepared this environmental impact statement to analyze environmental and socioeconomic impacts associated with alternatives to address this challenge.

  6. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  7. Plains & Eastern Clean Line Project Proposal for New or Upgraded

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 | Department of Energy Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy

  8. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  9. EIS-0486: Plains & Eastern Clean Line Transmission Project

    Broader source: Energy.gov [DOE]

    This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

  10. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  11. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    2012-01-01

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  12. EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

  13. EIS-0125: Bonneville Power Administration Intertie Development and Use

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this EIS to examine the environmental effects of expanding the capacity of the Pacific Northwest/Pacific Southwest Intertie, adoption of a long-term Intertie Access Policy, and enabling firm power marketing between California and the Northwest in order to make possible additional short- and long-term sales of the Federal power surplus. The Western Area Power Administration cooperated in the preparation of this EIS by virtue of its special expertise concerning the Third Alternating Current/California-Oregon Transmission Project.

  14. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

    2006-12-04

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

  15. EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville...

    Office of Environmental Management (EM)

    1: Areva Eagle Rock Enrichment Facility in Bonneville County, ID EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID May 20, 2011 delete me old download page ...

  16. Bonneville Power Administration 1998 Annual Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-01-01

    This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

  17. Continuity of Operations at Bonneville Power Administration, IG-0781 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Continuity of Operations at Bonneville Power Administration, IG-0781 Continuity of Operations at Bonneville Power Administration, IG-0781 In the event of a major disruption to its nonnal operations, Bonneville must be prepared to continue its essential functions, particularly its power scheduling, tra~lsmission scheduling, and system operations. In this regard, Bonneville is required to follow Federal Preparedness Circular 65 (FPC 65), as prescribed by the Department of

  18. Energy Department Names Elliot Mainzer Bonneville Power Administration Administrator

    Broader source: Energy.gov [DOE]

    The Energy Department announced that Elliot Mainzer has been appointed Administrator for the Bonneville Power Administration (BPA).

  19. Comments of the Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Bonneville Power Administration Comments of the Bonneville Power Administration BPA appreciates the opportunity to provide comments and information and submits the following comments in response to the DOE RFI. Comments of the Bonneville Power Administration (133.04 KB) More Documents & Publications RE: NBP RFI: Communication Requirements CX-001184: Categorical Exclusion Determination Communications Requirements of Smart Grid Technologies

  20. Distribution: Sonya Baskerville, Bonneville Power Administration, Liaison

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distribution: Sonya Baskerville, Bonneville Power Administration, Liaison Karen Boardman, Health Safety and Security, Director, National Training Center Robert Corbin, Fossil Energy, DAS, FE-4 Gordon Fox, Office of Science, Director, SC-31.2 Mark Gilbertson, Environmental Management, DAS, Site Restoration Larry Harp, Division of Engineering and Planning, South Western Power Administration Joshua Hill, Federal Energy Regulatory Commission, Acting Director, Logistics Mgmt. Div. Doug Hooker, Energy

  1. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  2. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary Bonneville ...

  3. DOE Names Bill Drummond As New Bonneville Power Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Administrator | Department of Energy Bill Drummond As New Bonneville Power Administration Administrator DOE Names Bill Drummond As New Bonneville Power Administration Administrator January 16, 2013 - 7:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The Energy Department has chosen Bill Drummond to be the new Administrator for the Bonneville Power Administration (BPA), one of the four Power Marketing Administrations (PMAs) the Department oversees. As BPA's Administrator, Drummond

  4. 2011 Annual Planning Summary for Bonneville Power Administration (BPA) |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Annual Planning Summary for Bonneville Power Administration (BPA) 2011 Annual Planning Summary for Bonneville Power Administration (BPA) Annual Planning Summaries briefly describe the status of ongoing NEPA compliance activities, any EAs expected to be prepared in the next 12 months, any EISs expected to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2011 Annual Planning Summary for Bonneville Power Administration

  5. PR 01-16 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in the spring. Chum salmon generally spawn in the lower part of the Columbia River below Bonneville Dam, preferring tributaries where warm ground water pushes up through spawning...

  6. Bonneville County, Idaho: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Inc Places in Bonneville County, Idaho Ammon, Idaho Idaho Falls, Idaho Iona, Idaho Irwin, Idaho Ririe, Idaho Swan Valley, Idaho Ucon, Idaho Retrieved from "http:...

  7. STATEMENT OF CLAUDIA ANDREWS CHIEF OPERATING OFFICER BONNEVILLE...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... This payment marked the 32 nd consecutive year that Bonneville has made its scheduled ... Additionally, BPA sets rates based on a Treasury Payment Probability of 95% over the ...

  8. EIS-0030: Bonneville Power Administration's Proposed FY 1980 Program

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this EIS to evaluate the environmental impacts of the proposed fiscal year 1980 construction and maintenance program.

  9. eGIS Portal PIA, Bonneville Power Administration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration eGIS Portal PIA, Bonneville Power Administration (395.19 KB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant

  10. EA-1945: Northern Mid-Columbia Joint Project; Grant, Douglas, and Chelan Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) prepared an EA to assess the potential environmental impacts of the Northern Mid-Columbia Joint Project, a 230-kilvolt transmission line proposed by BPA and the Public Utility Districts of Grant, Chelan, and Douglas Counties, Washington.

  11. Report on Audit of Bonneville Power Administration's Energy Resource Programs, IG-0379

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8, 1995 IG-1 INFORMATION: Report on "Audit of Bonneville Power Administration's Energy Resource Programs" The Secretary BACKGROUND: Bonneville Power Administration (Bonneville) was established to market and transmit hydroelectric power produced at the Bonneville Dam. Since then, Bonneville has acquired additional resources and, today, markets the power from 30 Federal dams and 1 non-federal nuclear plant in the Pacific Northwest. In April 1994, Bonneville entered into a 20-year

  12. EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Delaware | Department of Energy 5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4, 2011 EIS-0465: Notice of Intent to Prepare an Environmental Impact Statement Construction of Phase II of the Mid-Atlantic Power Pathway Transmission Line Project, in Maryland and Delaware February 4, 2011 EIS-0465: Announcement of Public Scoping Meetings Construction of Phase II of

  13. EIS-0486: Plains & Eastern Clean Line Transmission Project |...

    Broader source: Energy.gov (indexed) [DOE]

    Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the...

  14. Request for Proposals for New or Upgraded Transmission Line Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice ... Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice ...

  15. EIS-0463: Northern Pass Transmission Line Project, New Hampshire...

    Broader source: Energy.gov (indexed) [DOE]

    permit to Northern Pass Transmission, LLC, to construct, operate, maintain, and connect a new electric transmission line across the U.S.-Canada border in northern New Hampshire. ...

  16. EIS-0317: Kangley-Echo Lake Transmission Line Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

  17. EIS-0474: Southline Transmission Line Project; Arizona and New...

    Broader source: Energy.gov (indexed) [DOE]

    consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing...

  18. Section 1222 Program - Proposed Plains & Eastern Clean Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 1222 Program - Proposed Plains & Eastern Clean Line ... through the Southwestern Power Administration ... NEPA Website, and through other channels of communication. ...

  19. EIS-0499: Great Northern Transmission Line Project, Minnesota...

    Broader source: Energy.gov (indexed) [DOE]

    and connect a new 883-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau,...

  20. EIS-0393: Montanore Project; Montana | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0393: Montanore Project; Montana EIS-0393: Montanore Project; Montana Summary The USDA Forest Service (Kootenai National Forest) and the Montana Department of Environmental Quality prepared an EIS that evaluates the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. DOE's Bonneville Power Administration, a cooperating agency, has jurisdiction over the construction of a transmission line and two substations needed for

  1. Bonneville Power Administration 1997 Annual Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1998-01-01

    The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

  2. EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

  3. Bonneville Power Administration Overview As of December 1, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration Overview As of August 11, 2015 Grand Coulee Dam High Voltage Transmission Columbia Generating Station Moody's: Aa1Stable S&P: AA-Stable Fitch: AA...

  4. Audit of Bonneville Power Administration's Management of Information

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Resources, WR-B-96-06 | Department of Energy Bonneville Power Administration's Management of Information Resources, WR-B-96-06 Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06 wr-b-96-06.pdf (77.59 KB) More Documents & Publications Audit Report: WR-B-96-06 Audit Report: IG-0675 Audit Report: ER-B-99-04

  5. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project; Kalispell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional information is available on the project website, http:efw.bpa.govenvironmentalservicesDocumentLibraryKALISPELLKERR. PUBLIC COMMENT OPPORTUNITIES No public ...

  6. EIS-0106: Great Falls-Conrad Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

  7. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line that would connect a new switchyard with the existing Witten Substation. ...

  8. LLNL line-item construction projects Master Site Plan

    SciTech Connect (OSTI)

    1996-04-15

    This interim submittal is an updated 1996 overview of the Master Plan based on the 1995 LLNL Site Development Plan, illustrating the future land use considerations, and the locations of proposed facilities as documented through the line item development process and keyed to the summary table. The following components in addition to the line-item proposals remain key elements in the implementation strategy of the Master Plan: personnel migration, revitalization, space reduction, classified core contraction, utility systems, and environmental restoration.

  9. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  10. EIS-0124: Conrad-Shelby Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

  11. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  12. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2000-06-23

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides

  13. BPA.gov - Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Expand Projects & Initiatives Finance & Rates Expand Finance & Rates Involvement & Outreach Expand Involvement & Outreach Doing Business Expand Doing Business...

  14. EA-1974: Wallooskee-Youngs Confluence Restoration Project; Clatsop...

    Energy Savers [EERE]

    4: Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon EA-1974: Wallooskee-Youngs Confluence Restoration Project; Clatsop County, Oregon Summary Bonneville ...

  15. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Michael Lane

    2010-01-01

    Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

  16. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Michael Lane

    Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

  17. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  18. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to maintain reliable transmission service at low rates and meet growing demands for electricity. Over the past several years, numerous power generation projects, including large...

  19. Bonneville Power Administration Midway-Moxee Rebuild

    Office of Environmental Management (EM)

    ... of 2018. Ongoing stabilization of construction work areas, revegetation, monitoring, ... Construction activities associated with the project would not occur, and the reliability ...

  20. Bonneville Power Administration - 2007 Annual Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    process improvements in and across key functions to achieve improved efficiency and effectiveness. BPA is on schedule to meet targeted project milestones for all nine areas,...

  1. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of insulators damaged by firearms on its high- voltage power line near Joint Base Lewis-McChord in Tacoma, Wash. Damaged insulators can put people nearby at risk of electric...

  2. Fifteenmile Basin Habitat Enhancement Project: Annual Report...

    Office of Scientific and Technical Information (OSTI)

    wild winter steelhead in the Fifteenmile Creek Basin under the Columbia River Basin Fish and Wildlife Program. The project is funded by through the Bonneville Power...

  3. EIS-0514: Colusa-Sutter 500-kilovolt Transmission Line Project; Colusa and Sutter Counties, California

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration (Western) and the Sacramento Municipal Utility District (SMUD) are preparing a joint EIS/environmental impact report (EIR) –under, respectively, NEPA and the California Environmental Quality Act – that analyzes the potential environmental effects of the proposed new 500-kilovolt Colusa-Sutter (CoSu) Transmission Line Project. The proposed transmission line would interconnect the California-Oregon Transmission Project transmission system, near either Arbuckle or Maxwell, California, to the Central Valley Project transmission system near Yuba City, California. Western’s proposed action is to construct the CoSu Project and modify Western’s facilities to accommodate the new line; SMUD’s proposed action is to fund the proposal.

  4. EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 1: Areva Eagle Rock Enrichment Facility in Bonneville County, ID EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID May 20, 2011 delete me old download page duplicate

  5. EIS-0162: Bonneville Power Administration (BPA) Resource Programs

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration (BPA) developed this programmatic environmental impact statement to support decisions to be made in several future efforts to identify the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers.

  6. EIS-0031: Bonneville Power Administration 1979 Wholesale Rate Increase

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) developed this statement to explain the reasons for BPA's proposed power rate schedule, to conduct an analysis of the impacts which the proposal or alternatives thereto could have on both physical and socioeconomic characteristics of the human environment and to identify methods for mitigating the effects of the proposal.

  7. EIS-0102: Bonneville Power Administration's 1983 Wholesale Power Rate

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration prepared this EIS to evaluate the potential environmental impacts associated with an increase in wholesale power rates that would become effective on November 1, 1983, including the effects of rate hikes in that year and the cumulative effects of previous rate hikes.

  8. EIS-0095: Bonneville Power Administration's Expanded Residential Weatherization Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration prepared this statement to examine the environmental impacts of an expansion of the existing Residential Weatherization Program to include air-infiltration reducing (tightening) measures, such as storm windows and doors, insulation, weather-stripping and other improvements.

  9. EIS-0093: Bonneville Power Administration's 1982 Rate Proposal

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration prepared this statement to evaluate the potential environmental impacts associated with an increase in wholesale power rates for calendar year 1982, including the effects of rate hikes in that year, the cumulative effects of rate hikes from 1979-1985, as well as alternative revenue scenarios.

  10. Craig-Bonanza 345-kV Transmission Line Project: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Department of Energy (DOE), and the Western Area Power Administration (Western) proposes to construct and maintain a 345- kilovolt (kV) transmission line between Craig, Colorado, and Bonanza in eastern Utah. The project began in 1986 and construction is scheduled to be completed in 1989. The project, known as the Craig-Bonanza 345-kV Transmission Line Project (Project), will be located in Moffat and Rio Blanco counties in Colorado and Uintah County in Utah. Western has the lead role for project development and management, including environmental studies and construction. Cooperating federal agencies include the Bureau of Land Management (BLM), Rural Electrification Administration, US Fish and Wildlife Service, and Bureau of Indian Affairs. This environmental assessment was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ), the DOE and the BLM. 360 refs., 33 figs., 21 tabs.

  11. EIS-0451: Hooper Springs Transmission Project, Caribou County...

    Broader source: Energy.gov (indexed) [DOE]

    DOE's Bonneville Power Administration (BPA) prepared an EIS that evaluates the potential environmental impacts of a proposed new 115-kilovolt (kV) transmission line from BPA's...

  12. Request for Proposals for New or Upgraded Transmission Line Projects Under

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 | Department of Energy Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012 FRN Request for

  13. Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

  14. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect (OSTI)

    Not Available

    1990-11-01

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  15. Bonneville Power Administration 1991 site environmental report

    SciTech Connect (OSTI)

    Not Available

    1992-06-01

    In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  16. Bonneville Power Administration Site Environmental Report, 1991.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-06-01

    In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  17. Project W-314 sn-634 transfer line a-b to ax-b acceptance for beneficial use

    SciTech Connect (OSTI)

    Warnick, T. L.

    1997-09-29

    Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

  18. EIS-0419: Whistling Ridge Energy Project; Skamania County, Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS-0419: Whistling Ridge Energy Project; Skamania County, Washington Summary DOE's Bonneville Power Administration prepared an EIS that evaluates the potential environmental ...

  19. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    1996-05-01

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  20. Great Northern Transmission Line Project Draft Environmental Impact Statement_Volume II

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    O Agricultural Impact Mitigation Plan (AIMP) Example ITCM Minnesota - Iowa 345 kV Transmission Line Project: Final Environmental Impact Statement Appendix O Agricultural Impact Mitigation Plan O-1 ITC Midwest LLC Agricultural Impact Mitigation Plan Minnesota - Iowa 345 kV Transmission Project and Associated Facilities in Jackson, Martin, and Faribault Counties Docket Nos. ET6675/CN-12-1053 & ET6675/TL-12-1337 April 29, 2014 ITC Midwest's DEIS Comment Letter E X A M P L E ITCM Minnesota -

  1. MITIGATION ACTION PLAN FOR THE PLAINS & EASTERN CLEAN LINE TRANSMISSION PROJECT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MITIGATION ACTION PLAN FOR THE PLAINS & EASTERN CLEAN LINE TRANSMISSION PROJECT DOE/EIS-0486 MARCH 2016 3 1 INTRODUCTION The U.S. Department of Energy (DOE) National Environmental Policy Act (NEPA) Implementing Procedures (Title 10 Code of Federal Regulations [CFR] 1021.331) require completion of a mitigation action plan (MAP) following each Environmental Impact Statement (EIS) and its associated Record of Decision (ROD) to address mitigation commitments expressed in the ROD. The DOE Notice

  2. Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

    2005-06-01

    This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

  3. EIS-0005: Bonneville Power Administration FY 1979 Program

    Broader source: Energy.gov [DOE]

    This final statement is one of a series prepared annually by BPA on each fiscal year's proposed construction and maintenance program. This statement covers the potential impact of the major new facilities and maintenance programs proposed for fiscal year 1979. It must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report"" (The ""Role EIS""), particularly Appendix B - BFA Power Transmission.

  4. EL11-44 Compliance Filing of the Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    tariff and into existing and new Large Generator Interconnection Agreements and to be effective as of March 31, 2012, through March 30, 2013. On February 7, 2012, Bonneville...

  5. EA-0513: Approaches for Acquiring Energy Savings in Commercial Sector Buildings, Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal for DOE's Bonneville Power Administration to use several diverse approaches to purchase or acquire energy savings from commercial sector...

  6. A new full-color book goes behind the scenes at the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    team limit. The Bonneville Power Administration provides free programs, presentations and information to K-12 schools in the Pacific Northwest to help students achieve energy...

  7. A new full-color book goes behind the scenes at the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, Dec. 3, 2014 CONTACT: Doug Johnson, 503-230-5840503-230-5131 Richard Shaheen named senior vice president BPA...

  8. A new full-color book goes behind the scenes at the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, Sept. 24, 2014 CONTACT: Kevin Wingert, 503-230-4140503-230-5131 Nancy Mitman named BPA's chief financial...

  9. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    SciTech Connect (OSTI)

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  10. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  11. Microsoft Word - News Release -- Annual Reports now on line 2...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 15 BONNEVILLE POWER ADMINISTRATION Friday, Feb. 20, 2015 CONTACT: Mike Hansen, BPA 503-230-4328 or 503-230-5131 All 77 of BPA's annual reports now on line Portland, Ore. - The...

  12. EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental

    Broader source: Energy.gov [DOE]

    This statement, one of a series prepared by the U.S. Department of Energy’s Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

  13. EIS-0422: Record of Decision

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration’s Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project

  14. Audit of Bonneville Power Administration`s management of Information Resources

    SciTech Connect (OSTI)

    1996-04-02

    Bonneville Power Administration`s (Bonneville) information resources include computer-related equipment, spare parts, and computer software. The objective of this audit was to determine whether Bonneville acquired and accounted for computer-related equipment properly. We found positive aspects in Bonneville`s management of computer-related equipment. However, improvements could be made in implementing credit card and property procedures. Specifically, we found that improvements were needed to (1) control credit card purchases, (2) ensure that equipment was tagged and included in property records, (3) maintain accountability over spare parts, and (4) identify unused equipment. As a result, about $90,000 of equipment was bought by personnel whose authority to purchase was not properly documented, and about $182,000 of purchases lacked supporting invoices. In addition, one maintenance support group had over $109,000 of spare parts shortages. Furthermore, Bonneville could have saved about $803,000 had unused equipment been redistributed within Bonneville or to other Federal and state agencies. Management concurred with the recommendations to improve internal controls.

  15. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    1995-05-01

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  16. Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008

    SciTech Connect (OSTI)

    Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

    2009-09-01

    This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

  17. The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

    2009-09-01

    The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

  18. The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Fenner, Marsha W; Liolios, Konstantinos; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Kyrpides, Nikos C.

    2007-12-31

    The Genomes On Line Database (GOLD) is a comprehensive resource of information for genome and metagenome projects world-wide. GOLD provides access to complete and ongoing projects and their associated metadata through pre-computed lists and a search page. The database currently incorporates information for more than 2900 sequencing projects, of which 639 have been completed and the data deposited in the public databases. GOLD is constantly expanding to provide metadata information related to the project and the organism and is compliant with the Minimum Information about a Genome Sequence (MIGS) specifications.

  19. Valuation of selected environmental impacts associated with Bonneville Power Administration Resource Program alternatives

    SciTech Connect (OSTI)

    Englin, J E; Gygi, K F

    1992-03-01

    This report documents work undertaken by the Pacific Northwest Laboratory (PNL) and its contractors to assist the Bonneville Power Administration (Bonneville) in assessing the potential environmental consequences of new power resources. A major purpose of this effort is to describe and evaluate the techniques available for economic valuation of environmental costs. Another is to provide estimates of the environmental costs associated with specific power resources called for under Bonneville's Resource Programs. Bonneville's efforts to extend valuation techniques to as many impacts as can be reliably assessed represents a substantial advance in the application of state-of-the-art economic techniques to environmental assessments. This economic analysis evaluates effects on human health, wildlife, crops, and visibility impacts associated with air pollution. This report also discusses river recreation (primarily fishing) which may be affected by fluctuations in water levels. 70 refs.

  20. With the onset of fall and the return of school, the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tuesday, Nov. 26, 2013 CITY OF SALEM Nicole Miller, 503-540-2415 OREGON DEPARTMENT OF FISH & WILDLIFE Meg Kenagy, 503-947-6021 BONNEVILLE POWER ADMINISTRATION Kevin Wingert,...

  1. Review of Allegations Regarding Continued Retaliation Against a Bonneville Power Administration Whistleblower

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INQUIRY REPORT Review of Allegations Regarding Continued Retaliation Against a Bonneville Power Administration Whistleblower DOE/IG-0910 May 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 May 15, 2014 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Inquiry: "Review of Allegations Regarding Continued Retaliation Against a Bonneville Power

  2. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  3. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  4. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  5. Bonneville Power Administration: 10 Year Financial Plan, January...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (FCRPS) capital investments exceeding a projected 7 billion for energy resource acquisition, transmission construction and replacements, and fish and wildlife projects. During...

  6. NEPA strategy for the Bonneville Power Administration energy resource acquisition

    SciTech Connect (OSTI)

    Pierce, K.S.; Alton, C.C.; Linehan, A.O.

    1995-12-01

    The Bonneville Power Administration (BPA) has a statutory obligation to supply cost-effective electric power to its customers. BPA must also be consistent with the Pacific Northwest Electric Power Planning and Conservation Act, which requires consideration of the Northwest Power Planning Council`s Conservation and Electric Power Plan and Fish and Wildlife Program. The challenge is to operate effectively within an increasingly competitive and dynamic electric utility market while continuing its commitment to the National Environmental Policy Act (NEPA). BPA developed a tiered approach to its environmental analyses associated with energy resource planning and acquisition. The Resource Programs Environmental Impact Statement (RPEIS) is a programmatic document designed to support energy resource decisions for several years. The RPEIS includes a description of the environmental impacts and potential mitigation measures for various energy resources-including conservation, efficiency improvements, renewable resources, cogeneration, combustion turbines, nuclear, and coal. Information was also provided on fuel switching, load management, and emerging technologies. After analyzing the environmental trade-offs among resources, the RPEIS focuses on the cumulative effects of adding these resources to the existing power system. The Record of Decision documents that BPA`s resource acquisitions will include all cost-effective conservation and efficiency improvements, supplemented by a mix of renewables and thermal resources. Subsequent site-specific documents have been prepared on individual resource acquisitions. By focusing environmental reviews on the actual issues ripe for decision and by providing timely environmental information to the public and to the decisionmakers, this tiered approach led to better decisionmaking. BPA was able to operate in a more business-like manner while assuring NEPA compliance.

  7. Announcement of Change in Public Meeting Location for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department announces a change of location for the September 26, 2013 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. The meeting will be from 5 to 8 p.m.

  8. OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project

    Broader source: Energy.gov [DOE]

    On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

  9. The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  10. Type B Accident Investigation Board Report on the July 25, 1997, Contract Brush Cutter Injury on the Ashe-Marion #2 500 kV Line

    Broader source: Energy.gov [DOE]

    On July 25, 1997, at 1205 hours, a contract hand brush cutter was seriously injured when he felled a tree close to a Bonneville Power Administration energized transmission power line, located within a BPA transmission-line corridor.

  11. Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR

    SciTech Connect (OSTI)

    Miller, Naomi

    2011-07-01

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

  12. Sierra Pacific Power Company Alturas Transmission Line Project. Final environmental impact report/environmental impact statement, Volume I

    SciTech Connect (OSTI)

    1995-11-01

    This Environmental Impact Report/Environmental Impact Statement (EIR/S) describes the environmental setting and consequences of the construction and operation of the proposed Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCo) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power. This document was prepared by the California Public Utilities Commission (CPUC) and the U.S. Department of the Interior, Bureau of Land Management (BLM), pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), respectively. The purpose of this joint EIR/S is to report the results of the CPUC`s and BLM`s independent assessment of the potential environmental impacts that would result from the construction, operation, and maintenance of the proposed Alturas Transmission Line Project. The impact analysis is accompanied by the identification of feasible mitigation measures which, if incorporated into the project, would avoid or minimize impacts. This EIR/S also assesses alternatives to the Proposed Project and identifies those with the potential to eliminate or minimize impacts. This document considers comments made by agencies and the general public during the public scoping and Draft EIR/S comment periods.

  13. Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-06-20

    BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

  14. Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-11-01

    The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

  15. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  16. Re-Analysis of Hydroacoustic Fish-Passage Data from Bonneville Dam after Spill-Discharge Corrections

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Kim, Jina; Weiland, Mark A.; Hughes, James S.; Fischer, Eric S.

    2007-06-07

    The U.S. Army Corps of Engineers - Portland District asked Pacific Northwest National Laboratory to re-analyze four years of fixed-aspect hydroacoustic data after the District made adjustments to spill discharge estimates. In this report, we present new estimates of all major fish-passage metrics for study years 2000, 2001, 2002, and 2004, as well as estimates for 2005. This study supports the Portland District and its effort to maximize survival of juvenile salmon passing Bonneville Dam. Major passage routes through Bonneville Dam include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines at Powerhouse 2 (B2) and a sluiceway including the B2 Corner Collector. The original reports and all associated results, discussion, and conclusions for non flow-related metrics remain valid and useful, but effectiveness measures for study years 2000, 2001, 2002, and 2004 as reported in previous reports by Ploskey et al. should be superseded with the new estimates reported here. The fish-passage metrics that changed the most were related to effectiveness. Re-analysis produced spill effectiveness estimates that ranged from 12% to 21% higher than previous estimates in spring and 16.7% to 27.5% higher in summer, but the mean spill effectiveness over all years was only slightly above 1:1 (1.17 for spring and 1.29 for summer). Conversely surface-passage effectiveness decreased in the years this metric was measured (by 10.1% in spring and 10.7% in summer of 2002 and 9.5% in spring and 10.2% in summer of 2004). The smallest changes in the re-analysis were in project fish passage efficiency (0%-1%) and spill efficiency (0.9%-3.0%).

  17. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryLane-Wendson. PUBLIC COMMENT OPPORTUNITIES There are no ...

  18. EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western’s transmission system.

  19. EIS-0332: McNary-John Day Transmission Line Project, OR

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

  20. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    SciTech Connect (OSTI)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  1. The lick AGN monitoring project 2011: Fe II reverberation from the outer broad-line region

    SciTech Connect (OSTI)

    Barth, Aaron J.; Cooper, Michael C.; Pancoast, Anna; Treu, Tommaso; Bennert, Vardha N.; Brewer, Brendon J.; Canalizo, Gabriela; Filippenko, Alexei V.; Li, Weidong; Cenko, S. Bradley; Clubb, Kelsey I.; Gates, Elinor L.; Greene, Jenny E.; Malkan, Matthew A.; Sand, David J.; Stern, Daniel; Assef, Roberto J.; Woo, Jong-Hak; Bae, Hyun-Jin; Buehler, Tabitha; and others

    2013-06-01

    The prominent broad Fe II emission blends in the spectra of active galactic nuclei have been shown to vary in response to continuum variations, but past attempts to measure the reverberation lag time of the optical Fe II lines have met with only limited success. Here we report the detection of Fe II reverberation in two Seyfert 1 galaxies, NGC 4593 and Mrk 1511, based on data from a program carried out at Lick Observatory in Spring 2011. Light curves for emission lines including H? and Fe II were measured by applying a fitting routine to decompose the spectra into several continuum and emission-line components, and we use cross-correlation techniques to determine the reverberation lags of the emission lines relative to V-band light curves. In both cases, the measured lag (?{sub cen}) of Fe II is longer than that of H?, although the inferred lags are somewhat sensitive to the choice of Fe II template used in the fit. For spectral decompositions done using the Fe II template of Vron-Cetty et al., we find ?{sub cen}(Fe II)/?{sub cen}(H?) = 1.9 0.6 in NGC 4593 and 1.5 0.3 in Mrk 1511. The detection of highly correlated variations between Fe II and continuum emission demonstrates that the Fe II emission in these galaxies originates in photoionized gas, located predominantly in the outer portion of the broad-line region.

  2. NEPA audits at the Bonneville Power Administration`s office of energy resources

    SciTech Connect (OSTI)

    Beachler, M.C.; Patton, J.E.; Alton, C.C.

    1993-05-01

    Since 1984, the Bonneville Power Administration (Bonneville) has evaluated the environmental performance of its energy resource acquisition programs. To date, these programs have mostly comprised conservation activities in residential and commercial buildings. In the environmental documentation for these programs under the National Environmental Policy Act of 1969 (NEPA), the agency has established a set of mitigation measures that ensure against adverse environmental impacts. The agency uses environmental audits to evaluate the programs` performance in meeting the NEPA promises, and how well NEPA documents meet the programs needs and how effectively environmental and program staff interact. Since 1984 the Pacific Northwest Laboratory (PNL) has conducted 22 of the audits for Bonneville. The audits are inexpensive and unobstrusive; thus they can be repeated as needed and can be used as a tool to facilitate communication rather than simply to meet administrative rules. As Bonneville moves into an aggressive energy resource acquisition mode, these audits will serve as a model for the ongoing evaluation of environmental performance and may be adopted agency-wide to address regulations beyond NEPA.

  3. Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-09

    BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability

  4. EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

  5. Project resumes: biological effects from electric fields associated with high-voltage transmission lines

    SciTech Connect (OSTI)

    1980-01-01

    Abstracts of research projects are presented in the following areas: measurements and special facilities; cellular and subcellular studies; physiology; behavior; environmental effects; modeling, scaling and dosimetry; and high voltage direct current. (ACR)

  6. EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of the Interior’s Bureau of Indian Affairs considered preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency. This project has been canceled.

  7. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  8. EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

  9. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  10. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado.

  11. DOE Environmental Impact Statement Public Scoping Meeting on Champlain Hudson Power Express Transmission Line Project

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) is hosting seven meetings for public participation as part of its Environmental Impact Statement (EIS) preparation process pursuant to the National Environmental Policy Act (NEPA) to assess the potential environmental impacts from its proposed action of granting a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new electric transmission line across the U.S.- Canada border in northeastern New York.

  12. Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2012-07-01

    In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers

  13. Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration

    2006-10-25

    The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

  14. NEPA audits at the Bonneville Power Administration's office of energy sources

    SciTech Connect (OSTI)

    Baechler, M. )

    1993-01-01

    Since 1984, the Bonneville Power Administration has evaluated the environmental performance of its energy resource acquisition programs. To date, these programs have mostly comprised conservation activities in residential and commercial buildings. In its NEPA documentation for these programs, the agency has established a set of mitigation measures that ensure against adverse environmental impacts. The agency uses the environmental audits to evaluate the programs' performance in meeting the NEPA promises, as well as addressing how well NEPA documents meet the programs' needs and how effectively environmental and program staff interact. The audits are inexpensive and unobtrusive, thus they can be repeated as needed and can be used as a tool to facilitate communication rather than simply to meet administrative rules. As Bonneville moves to an aggressive energy resource acquisition mode, these audits will serve as a model for the ongoing evaluation of environmental performance and may be adopted agency-wide to address regulations beyond NEPA.

  15. Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AUDIT OF BONNEVILLE POWER ADMINISTRATION'S MANAGEMENT OF INFORMATION RESOURCES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

  16. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  17. Environmental Assessment for the Terminal Expansion Project.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1985-02-01

    The Terminal Expansion Project is proposed by Bonneville Power Administration (BPA), Southern California Edison (SCE), and the Los Angeles Department of Water and Power (LADWP) to increase the operating capacity of the existing bipole direct current (dc) Intertie line between the Celilo Converter Station at The Dalles, Oregon, and the Sylmar converter Station at Sylmar, California. The proposal will allow a greater exchange of electric power between the Pacific Northwest (PNW) and Southern California without constructing new interregional transmission lines. By adding more alternating ac/dc converter equipment at the terminals, the conductors on the existing 845-mile dc intertie transmission line can be operated at full design capacity. The dc Intertie plus two other ac lines which terminate near San Francisco comprise the ''Intertie.'' Though the project is interregional, relatively little construction will be needed. This Environmental Assessment addresses the environmental impacts of the proposed actions and makes a determination as to their significance. Though LADWP is complying with the State environmental process, as required by the California Environmental Quality Act (CEQA), the impacts of their construction are being considered as part of the impacts of the overall proposal and are considered in the determination of significance.

  18. EIS-0008-S: Supplement, Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate the environmental impacts of construction of a steel double-circuit 345-kilovolt transmission line from Moore Substation near Littleton, New Hampshire, to Comerford Substation near Monroe, New Hampshire and a 345-kilovolt wood pole transmission line from Comerford Substation to Webster Substation near Franklin, New Hampshire, as part of the Dickey-Lincoln School Lakes Transmission Project. The Final SEIS consists entirely of Section 9 (Consultation and Coordination), which incorporates public and agency comments on the Draft SEIS and responses to those comments, as well as all necessary errata and addenda to the Draft SEIS. This SEIS is a supplement to DOE/EIS-008, Dickey-Lincoln School Lakes Transmission Project.

  19. Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1990-07-01

    The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

  20. Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam

    SciTech Connect (OSTI)

    Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

    2007-01-30

    At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at

  1. Bonneville Project Act in U.S.C | Department of Energy

    Energy Savers [EERE]

    of Energy Boise State University Wins Collegiate Wind Competition 2015 Boise State University Wins Collegiate Wind Competition 2015 May 4, 2015 - 1:54pm Addthis Boise State University Wins Collegiate Wind Competition 2015 Jose Zayas Jose Zayas Wind Energy Technologies Office Director This past week, seven teams of students from across the country gathered at the National Renewable Energy Laboratory's National Wind Technology Center (NWTC) for a fierce blade-to-blade wind turbine rematch. At

  2. EIS-0008: Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Army Corps of Engineers and the U.S. Department of Energy's Bonneville Power Administration developed this statement to evaluate the environmental impacts of the Dickey-Lincoln School Lakes Transmission Project.

  3. EIS-0422: Notice of Intent to Prepare an Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration Central-Ferry Lower Monumental Transmission Line Project in Garfield, Columbia, and Walla Walla Counties in Washington

  4. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line; Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuilding of the existing 34-mile Midway-Moxee transmission line and the proposed rebuilding and upgrading of the existing 26-mile Midway-Grandview transmission line. Both 115-kV lines originate at the BPA Midway Substation in Benton County and terminate in Yakima County.

  5. Groups of homeomorphisms of the line. Criteria for the existence of invariant and projectively invariant measures in terms of the commutator subgroup

    SciTech Connect (OSTI)

    Beklaryan, L A

    2014-12-31

    Existence criteria for invariant and projectively invariant measures are obtained for a group G of homeomorphisms of the line. These criteria are formulated in terms of the commutator subgroup [G,G]. For the special (but very important) case of groups of homeomorphisms of the line containing a freely acting element we obtain a criterion for the existence of a projectively invariant measure in the form of the absence of a special subgroup with two generators in which one of the generating elements is a freely acting element. Bibliography: 20 titles.

  6. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  7. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    SciTech Connect (OSTI)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  8. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  9. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  10. Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242- Dec. 17, 2014

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS–0486; Draft EIS) for a 90-day public comment period. DOE also announces 15 public hearings to receive comments on the Draft EIS. In addition, DOE invites comments on the National Historic Preservation Act Section 106 process and any potential adverse impacts to historic properties from the proposed Project.

  11. EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

  12. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    SciTech Connect (OSTI)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  13. Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

    SciTech Connect (OSTI)

    Mueller, Robert P.; Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.

    2015-02-24

    This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

  14. DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the

  15. Microsoft Word - STO Comments on Clean Line Application under...

    Broader source: Energy.gov (indexed) [DOE]

    Clean Line Transmission Line Project ("Clean Line Project" or "Project"). ... "objective of integrating more renewable resources onto the grid," 1 However, after reviewing Section ...

  16. EIS-0317: Record of Decision | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Lake Transmission Line Project Final Environmental Impact Statement (DOEEIS-0317-S1, June 2003). Bonneville Power Administration Kangley-Echo Lake Transmission Line Project...

  17. EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct about 305 miles of 500-kV transmission line from northeast Oregon to southwest Idaho. BPA’s proposed action is to partially fund part the transmission line.

  18. Accident Investigation of the September 20, 2012 Fatal Fall from the Dworshak-Taft #1 Transmission Tower, at the Bonneville Power Marketing Administration

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report is an independent product of the Level l Accident Investigation Board appointed by Brad Bea, Chief Safety Officer, Bonneville Power Administration. The Board was appointed to perform a Levell Accident Investigation and to prepare an investigation report in accordance with Bonneville Power Administration Manual, Chapter 181, Accident Investigation and Reporting

  19. THE LICK AGN MONITORING PROJECT 2011: DYNAMICAL MODELING OF THE BROAD-LINE REGION IN Mrk 50

    SciTech Connect (OSTI)

    Pancoast, Anna; Brewer, Brendon J.; Treu, Tommaso; Bennert, Vardha N.; Sand, David J.; Barth, Aaron J.; Cooper, Michael C.; Canalizo, Gabriela; Filippenko, Alexei V.; Li, Weidong; Cenko, S. Bradley; Clubb, Kelsey I.; Gates, Elinor L.; Greene, Jenny E.; Malkan, Matthew A.; Stern, Daniel; Assef, Roberto J.; Woo, Jong-Hak; Bae, Hyun-Jin; Buehler, Tabitha; and others

    2012-07-20

    We present dynamical modeling of the broad-line region (BLR) in the Seyfert 1 galaxy Mrk 50 using reverberation mapping data taken as part of the Lick AGN Monitoring Project (LAMP) 2011. We model the reverberation mapping data directly, constraining the geometry and kinematics of the BLR, as well as deriving a black hole mass estimate that does not depend on a normalizing factor or virial coefficient. We find that the geometry of the BLR in Mrk 50 is a nearly face-on thick disk, with a mean radius of 9.6{sup +1.2}{sub -0.9} light days, a width of the BLR of 6.9{sup +1.2}{sub -1.1} light days, and a disk opening angle of 25 {+-} 10 deg above the plane. We also constrain the inclination angle to be 9{sup +7}{sub -5} deg, close to face-on. Finally, the black hole mass of Mrk 50 is inferred to be log{sub 10}(M{sub BH}/M{sub Sun }) = 7.57{sup +0.44}{sub -0.27}. By comparison to the virial black hole mass estimate from traditional reverberation mapping analysis, we find the normalizing constant (virial coefficient) to be log{sub 10} f = 0.78{sup +0.44}{sub -0.27}, consistent with the commonly adopted mean value of 0.74 based on aligning the M{sub BH}-{sigma}* relation for active galactic nuclei and quiescent galaxies. While our dynamical model includes the possibility of a net inflow or outflow in the BLR, we cannot distinguish between these two scenarios.

  20. Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration

    SciTech Connect (OSTI)

    Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

    1992-05-28

    This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

  1. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Batten, G.; Cushing, Aaron W.; Kim, Jin A.; Johnson, Gary E.; Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.; Carpenter, Scott M.; Deng, Zhiqun; Etherington, D. J.; Fischer, Eric S.; Fu, Tao; Greiner, Michael J.; Hennen, Matthew J.; Martinez, Jayson J.; Mitchell, T. D.; Rayamajhi, Bishes; Zimmerman, Shon A.

    2013-02-15

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  2. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  3. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  4. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  5. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  6. EIS-0471: Department of Energy Loan Guarantee to Support Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of construction, operation, and decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County, Idaho. (DOE adopted this EIS issued by NRC on 04/13/2007.)

  7. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    SciTech Connect (OSTI)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments.

  8. Molten-Caustic-Leaching (Gravimelt) System Integration Project, Phase 2. Topical report for test circuit maintenance, refurbishment, modification, and off-line operation

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This is a report of the maintenance, refurbishment, modifications, and off-line circuit component testing of the integrated test circuit of the Molten-Caustic-Leaching (MCL or Gravimelt) process for the desulfurization and demineralization of coal. The project is sponsored by the Pittsburgh Energy Technology Center of the US Department of Energy under Contract No. DE-AC22-86-PC91257.

  9. ONE NEVADA LINE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE PROJECT SUMMARY In February 2011, the Department of Energy issued a $343 million loan guarantee to finance the One Nevada Transmission Line (ON Line) project, a 235-mile, 500 kV AC transmission line capable of carrying 600 MW of power to the grid running

  10. EIS-0393: Montanore Project; Montana

    Broader source: Energy.gov [DOE]

    The USDA Forest Service (Kootenai National Forest) and the Montana Department of Environmental Quality prepared an EIS that evaluates the potential environmental impacts of a proposed copper and silver underground mine about 18 miles south of Libby, Montana. DOE’s Bonneville Power Administration, a cooperating agency, has jurisdiction over the construction of a transmission line and two substations needed for powering the mine facilities if the proposed action is implemented.