Sample records for line project bonneville

  1. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

  2. Bonneville Project: CFD of the Spillway Tailrace

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

    2012-11-19T23:59:59.000Z

    US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

  3. PROJECT HIGHLIGHTS In the first project of its kind, the Bonneville Power Administration teamed with the Pacific Northwest

    E-Print Network [OSTI]

    , which were narrowed to two areas for detailed assessment of subsurface storage capacity, power plant of power production from wind resources, and environmental requirements mandate the use of hydroelectricPROJECT HIGHLIGHTS In the first project of its kind, the Bonneville Power Administration teamed

  4. Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.

    SciTech Connect (OSTI)

    Not Available

    1985-01-01T23:59:59.000Z

    Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

  5. Three-Dimensional Simulation of Forebay and Turbine Intakes Flows for the Bonneville Project

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.; Ebner, Laurie L.

    2002-12-31T23:59:59.000Z

    Natural resource applications of computational fluid dynamics (CFD) models are becoming more frequent with the advances in computational power and the availability of commercial meshing software and verified CFD solver applications. The Bonneville Lock and Dam Project, constructed and operated by the U. S. Army Corps of Engineers, is the westernmost dam on the Columbia River, and is located about 40 miles upstream of Portland, Oregon. A set of 3D CFD models have been developed for the Bonneville Project forebay and turbine intakes; the CFD models provide a tool to predict the impact of proposed changes in operational rules both for the overall river flow patterns and near the turbine intakes. These models also offer rapid insight into the performance of proposed or existing hydraulic structures. The creation of a computational domain for Bonneville was complex and required the use of many software tools to integrate the diverse data sources that described the river and powerhouse geometry into a single computational domain. Once the computational mesh was created, flows were simulated by solving the Reynolds-averaged Navier-Stokes (RANS) equations together with a two-equation (k-epsilon) turbulence model. The model was validated using velocity data measured in reduced scale physical models and in the field.

  6. Northwest Power and Conservation Council Fish and Wildlife Project Funding Recommendations to the Bonneville Power Administration

    E-Print Network [OSTI]

    to the Bonneville Power Administration for Fiscal Years 2007 through 2009 October 2006 Programmatic Issues-based obligations into the broader Northwest Power Act program -- it is precisely the fact that Bonneville has to Bonneville that satisfy Bonneville's ESA-based objectives balanced with its broader Northwest Power Act

  7. Idaho Model Watershed Project : Annual Report to the Bonneville Power Administration January 1, 1997 - December 31, 1997.

    SciTech Connect (OSTI)

    Bradbury, Allen; Slavin, Katie

    1998-10-28T23:59:59.000Z

    The Model Watershed Project was initiated in the fall of 1992 with a grant from Bonneville Power Administration. The objective of this project is to protect, enhance and restore anadromous and resident fish habitat and achieve and maintain a balance between resource protection and resource use on a holistic watershed basis.

  8. EA-1002: Bonneville Power Administration's Hot Springs- Garrison Fiber Optic Project, Montana

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to upgrade its operational telecommunications system between the Hot...

  9. EA-0956: South Fork Snake River/Palisades Wildlife Mitigation Project, Bonneville County, Idaho

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration proposal to fund the implementation of the South Fork Snake River Programmatic...

  10. EIS-0173: Bonneville Power Administration/Puget Power Northwest Washington Transmission Project

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) prepared this environmental impact statement to analyze the environmental impacts of an upgrade that BPA and Puget Sound Power & Light Company are considering implementing on the existing high- voltage transmission system in the Whatcom and Skagit Counties area of the State of Washington, between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995.

  11. EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

    Broader source: Energy.gov [DOE]

    This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

  12. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

  13. EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

  14. Computational Fluid Dynamics Modeling of the Bonneville Project: Tailrace Spill Patterns for Low Flows and Corner Collector Smolt Egress

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Perkins, William A.

    2010-12-01T23:59:59.000Z

    In 2003, an extension of the existing ice and trash sluiceway was added at Bonneville Powerhouse 2 (B2). This extension started at the existing corner collector for the ice and trash sluiceway adjacent to Bonneville Powerhouse 2 and the new sluiceway was extended to the downstream end of Cascade Island. The sluiceway was designed to improve juvenile salmon survival by bypassing turbine passage at B2, and placing these smolt in downstream flowing water minimizing their exposure to fish and avian predators. In this study, a previously developed computational fluid dynamics model was modified and used to characterized tailrace hydraulics and sluiceway egress conditions for low total river flows and low levels of spillway flow. STAR-CD v4.10 was used for seven scenarios of low total river flow and low spill discharges. The simulation results were specifically examined to look at tailrace hydraulics at 5 ft below the tailwater elevation, and streamlines used to compare streamline pathways for streamlines originating in the corner collector outfall and adjacent to the outfall. These streamlines indicated that for all higher spill percentage cases (25% and greater) that streamlines from the corner collector did not approach the shoreline at the downstream end of Bradford Island. For the cases with much larger spill percentages, the streamlines from the corner collector were mid-channel or closer to the Washington shore as they moved downstream. Although at 25% spill at 75 kcfs total river, the total spill volume was sufficient to "cushion" the flow from the corner collector from the Bradford Island shore, areas of recirculation were modeled in the spillway tailrace. However, at the lowest flows and spill percentages, the streamlines from the B2 corner collector pass very close to the Bradford Island shore. In addition, the very flow velocity flows and large areas of recirculation greatly increase potential predator exposure of the spillway passed smolt. If there is concern for egress issues for smolt passing through the spillway, the spill pattern and volume need to be revisited.

  15. EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

  16. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    http:www.bpa.gov PR 02 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Thursday, Jan. 23, 2014 CONTACT: Kevin Wingert, 503-230-4140971-207-8390 or 503-230-5131 BPA...

  17. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 or new project number. We propose that our respective staffs continue to work together to prioritize

  18. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208Op prioritizes habitat projects that are in tidally influenced areas of the tributaries. CRESTS new habitat

  19. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 habitats that promote diverse estuarine life histories. The 2008 BiOp prioritizes habitat projects

  20. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 on the programmatic approach BPA is taking with habitat projects. The concerns include decision/prioritization

  1. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 is the provincial reviews that will begin to prioritize fish and wildlife projects in each region. We recognize

  2. Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-02-08T23:59:59.000Z

    This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

  3. McNary-John Day Transmission Line Project, Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-30T23:59:59.000Z

    Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

  4. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect (OSTI)

    N /A

    1998-08-01T23:59:59.000Z

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  5. EIS-0447: Champlain Hudson Power Express Transmission Line Project...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    47: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluated the...

  6. EA-1880: Big Bend to Witten Transmission Line Project, South...

    Office of Environmental Management (EM)

    880: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with...

  7. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) project narrative for Independent information from the BPA project manager, please contact Tracy Hauser at tlhauser@bpa.gov or Marchelle Foster

  8. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 collaboratively with the Council, CBFWA and project sponsors to further prioritize and schedule implementation categories following future reviews and prioritization. Projects in these categories could require contract

  9. Guidewall demolition at Bonneville Dam

    SciTech Connect (OSTI)

    Marks, R.S. [Kiewit Pacific Co., Vancouver, WA (United States)

    1997-05-01T23:59:59.000Z

    Bonneville Dam, completed in 1938, included the smallest and busiest lock on the Columbia and Snake River Navigation System. To expedite barge traffic through this restriction, a new larger lock was designed and contracted by the U.S. Army Corp of Engineers. The project involved drill and shoot, alluvial gravel and rock excavation, dredging, rock support, structural concrete, and assorted demolitions. A large portion of the demolition work was the removal of the existing guidewall to allow barge traffic access to the new lock. Guidewall Demolition was completed using drill and shoot techniques and dredging the debris from the channel. This work involved unique challenges and innovative solutions to produce a successful result.

  10. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 Opinion for the federal hydropower system; and management of Program spending within a budget of $143, mitigation, and enhancement project proposals recommended by the Northwest Power and Conservation Council

  11. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208. Over the last 10 years the UCSRB has garnered the confidence of local sponsors through its leadership strategy to support salmon recovery in the Upper Columbia. The project's narrative proposal addresses how

  12. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Status of Rollover, Large Project Program and Billing Credits With the conclusion of the IPR2 process BPA can now confirm the status of several of the programs agreed upon during...

  13. Microsoft Word - CX-NorthBonneville-RossNorthBonneville-Troutdale...

    Broader source: Energy.gov (indexed) [DOE]

    4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Civil Engineer - TEP-TPP-3 Proposed Action: North Bonneville-Ross 1 230-kV, North...

  14. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

  15. Bonneville Power Ampere Annex Z-995 Building

    High Performance Buildings Database

    Vancouver, WA The Bonneville Power Administration (BPA), a federal agency headquartered in Portland, Oregon, provides about half of the electricity used in the Pacific Northwest and operates more than three-fourths of the region's high-voltage transmission. Because BPA markets power at cost from 31 federal dams, its rates are among the least expensive electricity in the country. The Ampere Annex project is a renovation of an exisiting 60-year-old standard warehouse building located within the Ross Complex.

  16. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.NewofGeothermal Heat PumpJorgeAtlGrad.Employee,

  17. EIS-0325: Schultz-Hanford Area Transmission Line Project, WA

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  18. Independent Oversight Review, Bonneville Power Administration...

    Broader source: Energy.gov (indexed) [DOE]

    014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office...

  19. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 and Conservation Council (Council) members have asked that Bonneville Power Administration (Bonneville) make its in the rating process. As you know, the Northwest Power Act obligates Bonneville to use its authorities to fund

  20. PRESSURIZATION TEST RESULTS: BONNEVILLE POWER ADMINISTRATION ENERGY CONSERVATION STUDY

    E-Print Network [OSTI]

    Krinkel, D.L.

    2013-01-01T23:59:59.000Z

    RESULTS: BONNEVILLE POWER ADMINISTRATION ENERGY CONSERVATIONResults: Bonneville Power Administration Energy Conservationof the Bonneville Power Administration's Energy Conservation

  1. Grand Coulee Transmission Line Replacement Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

  2. EIS-0060: Bonneville Power Administration Proposed FY 1981 Program

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this statement to evaluate environmental impacts of the proposed fiscal year 1981 construction and maintenance program to construct system additions and modifications including 303–326 miles of new 500 kilovolt transmission lines, approximately 131 miles of upgraded existing lines, 6 new substations, and facility additions at 7–8 existing substations.

  3. EIS-0077-S: Bonneville Power Administration Crow Butte Slough Crossing

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate potential impacts resulting from construction of a 4,700 -foot segment of the Ashe-Slatt transmission line at Crow Butte Slough, overhead on towers on the existing right-of-way. This SEIS is a supplement to DOE/EIS-0077, Ashe-Slatt (Pebble Springs) 500-kilovolt Transmission Line.

  4. EIS-0474: Southline Transmission Line Project; Arizona and New Mexico

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EIS to evaluate the environmental impacts of the proposed Southline Transmission Project, which would consist of a new 225-mile transmission line between existing substations at Afton, New Mexico, and Apache, Arizona, and improvements to approximately 130 miles of existing transmission lines between the Apache and Saguaro, Arizona substations.

  5. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-02-01T23:59:59.000Z

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  6. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-02-01T23:59:59.000Z

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  7. CXD 4601, Line Yard Fence Project (4601)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced. C o w l i t z C o . C l a r8.0 -CURRICULUM VITAEAllen RadioLine

  8. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Lane, Michael

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  9. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    SciTech Connect (OSTI)

    Lane, Michael

    2012-01-01T23:59:59.000Z

    Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

  10. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana.

  11. EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

  12. GLIDES PROJECT GuideLines Into DEcision Support

    E-Print Network [OSTI]

    Lee, Daeyeol

    GLIDES PROJECT GuideLines Into DEcision Support sponsored by The Agency for Healthcare Research;Topics · GLIDES 4-level "stack" ­ NarraAve guideline with quality, implementabilityLon, and local coding/linking ­ To Formal Quality Measure via QDM, eMeasure · BRIDGE

  13. Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-01-10T23:59:59.000Z

    Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

  14. Bonneville Power Administration's Purchasing of Energy Savings

    E-Print Network [OSTI]

    Schick, H.

    BONNEVILLE POWER ADMINISTRATION'S PURCHASE OF ENERGY SAVINGS Harold (Skip) Schick Leslie E. McMillan Bonneville Power Administration Port1and, Oregon INTRODUCTION The Bonneville Power Administration (BPA) is conducting a commercial... buildings retrofit program in the Pacific Northwest by making pay ments to a sponsor, such as an energy serv ice company or architectural and engineering firm, for energy savings which actually occur in a commercial building. This effort is one...

  15. Bonneville Power Administration, Oregon Energy Northwest, Washington...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration, Oregon Energy Northwest, Washington; Wholesale Electric Primary Credit Analyst: David N Bodek, New York (1) 212-438-7969; david.bodek@standardandpo...

  16. Energy Northwest, Washington Bonneville Power Administration...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Northwest, Washington Bonneville Power Administration, Oregon; Wholesale Electric Primary Credit Analyst: David N Bodek, New York (1) 212-438-7969; david.bodek@standardandpoors.com...

  17. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 about the amount and nature of cost-sharing offered. As a result, Bonneville Power Administration, Chairman Northwest Power and Conservation Council 851 S.W. Sixth Ave., Suite 1100 Portland, OR 97204

  18. Bonneville Power Administration and the Industrial Technologies Program Leverage Support to Overcome Energy Efficiency Barriers in the Northwest

    Broader source: Energy.gov [DOE]

    This case study explores how Bonneville Power Administration, a Northwest regional wholesale power provider, rethought how to encourage and promote energy efficiency projects through its utilities.

  19. Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Oracle-Saguaro 115-kV Transmission Line Routine Maintenance Project, Mile 6 to Oracle Substation Categorical Exclusion Continuation Sheet Project Description Maintenance work at...

  20. Bonneville Power Administration 1993 Annual Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-01-01T23:59:59.000Z

    For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

  1. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation.

  2. EIS-0183: Bonneville Power Administration Business Plan

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration is considering how to respond to the challenges of a dynamic electric utility industry, and prepared this environmental impact statement to analyze environmental and socioeconomic impacts associated with alternatives to address this challenge.

  3. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 expect that the ISRP will identify the need to define decision/prioritization criteria, establish local

  4. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208-years. Review and prioritization of proposals based on a common set of performance expectations and programmatic

  5. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 levels, which may include reallocation and/or prioritization of existing RM&E funding. Regional level

  6. Bonneville Power Administration FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    40 13 Bonneville Power Administration FOR IMMEDIATE RELEASE December 26, 2013 CONTACT: Teresa Waugh, 503-230-7536 or 503-230-5131 BPA seeks comment on draft study of proposed...

  7. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Friday, May 8, 2015 CONTACT: Kevin Wingert, 503-230-4140503-230-5131 BPA is well prepared to meet dry year demands Planning...

  8. Bonneville Power Administration Attachment P Oversupply Management...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    following: i. With respect to contracts for the sale of all or part of a facility's output executed on or before March 6, 2012 - Bonneville Power Administration Attachment P...

  9. EIS-0076: Bonneville Power Administration Alumax

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) developed this EIS for the proposed Alumax primary aluminum reduction plant to determine the environmental, economic and social impacts of plant construction, as well as potential power supply alternatives for BPA.

  10. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  11. BONNEVILLE POWER ADMINISTRATION'S REQUEST FOR APPROVAL 1 OF REVISED...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ) ) Docket No. EL11-44- Horizon Wind Energy LLC, ) ) Complainants, ) ) Bonneville Power Administration, ) ) Respondent. ) United States Department of Energy ) Bonneville...

  12. EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1: Areva Eagle Rock Enrichment Facility in Bonneville County, ID EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID May 20, 2011 EIS-0471: Final Environmental...

  13. Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

    2005-12-22T23:59:59.000Z

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

  14. Bonneville Power Administration Dear Steve Wright,

    E-Print Network [OSTI]

    Bonneville Power Administration Dear Steve Wright, I'm writing to urge you to protect the remaining a backseat when energy markets are unstable and water resources are limited. If we are truly serious about role by diversifying its energy supplies and investing in clean and renewable energy sources

  15. Bonneville Power Administration Administrator Steve Wright

    E-Print Network [OSTI]

    Administrator Steve Wright, I strongly support a clean energy future for our region that includes plentiful wild salmon, clean, renewable energy, and a healthy economy. The Bonneville Power Administration (BPABonneville Power Administration Administrator Steve Wright PO Box 12999 Portland, OR 97208 Dear

  16. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    , monitoring, and evaluation requirements, will be considered to ensure that adaptive management principlesDepartment of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 Federal Columbia River Power System Biological Opinion (BiOp), we request that the review

  17. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    monitoring programs and information sharing that is critical to making adaptive management decisions. BPADepartment of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 Program (Program) and to track performance indicators under the Federal Columbia River Power System (FCRPS

  18. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208; and wildlife mitigation operations and maintenance. It will be important to prioritize and sequence, synthesizing, prioritizing and targeting, tactically, all of the region's efforts: for actions and spending

  19. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208, provides an excellent filter for prioritizing RM&E actions within a defined budget. And most importantly. Such prioritization efforts would also have the value of stimulating regional engagement on the appropriate balance

  20. EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

  1. Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin)

    Broader source: Energy.gov [DOE]

    This page describes application requirements for all projects that involve the installation of an electricity transmission line or substation that also require either a Certificate of Public...

  2. EIS-0125: Bonneville Power Administration Intertie Development and Use

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this EIS to examine the environmental effects of expanding the capacity of the Pacific Northwest/Pacific Southwest Intertie, adoption of a long term Intertie Access Policy and enabling firm power marketing between California and the Northwest in order to make possible additional short-and long-term sales of the Federal power surplus. The Western Area Power Administration cooperated in the preparation of this EIS by virtue of its special expertise concerning the Third Alternating Current/California-Oregon Transmission Project.

  3. Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

    2006-12-04T23:59:59.000Z

    The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

  4. Lovell-Yellowtail transmission line rebuild project, Western...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail...

  5. Fast three-dimensional terahertz computed tomography using real-time line projection of

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Fast three-dimensional terahertz computed tomography using real-time line projection of intense terahertz computed tomography by using real-time line projection of intense terahertz beam generated). 4. B. Ferguson, S. Wang, D. Gray, D. Abbot, and X.-C. Zhang, "T-ray computed tomography," Opt. Lett

  6. EIS-0317: Kangley-Echo Lake Transmission Line Project

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

  7. Bonneville Power Admin (Idaho) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,BelcherBlundell 1 GeothermalBonneville Power Admin

  8. Bonneville Power Admin | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: EnergyAvignon,BelcherBlundell 1 GeothermalBonneville Power

  9. Bonneville Power Administration, P.O. Box

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator|December 5, 2011 Bonneville

  10. Bonneville Power Admin | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass ConversionsSouthby 2022 |BleckleyMotionBocaBondBonner County,Bonneville

  11. Bonneville Power Admin (Washington) | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovation in CarbonofBiotins Energia Jump to:BlackBluewattBonneville Power

  12. EIS-0101: Thermopolis, Alcova, Casper Transmission Line Project

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this statement to evaluate the environmental impacts of constructing, operating and maintaining a 230-kilovolt transmission line between Thermopolis, Wyoming, and Alcova, Wyoming, and a 230/345-kilovolt transmission line between Alcova, Wyoming, and Casper, Wyoming.

  13. A conjugate Rosen's gradient projection method with global line search for piecewise linear optimization

    E-Print Network [OSTI]

    Beltran-Royo, Cesar

    A conjugate Rosen's gradient projection method with global line search for piecewise linear cutting plane method, simplex method, Rosen's gradient projection, conjugate gradient. 1 Introduction the zig-zagging of the gradient projection, we propose a conjugate gradient version of the face simplex

  14. EIS-0486: Plains & Eastern Clean Line Transmission Project |...

    Broader source: Energy.gov (indexed) [DOE]

    project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver...

  15. EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...

    Broader source: Energy.gov (indexed) [DOE]

    rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. Additional information is available at the...

  16. EIS-0106: Great Falls-Conrad Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

  17. A Representation of Projective Space by the Points of a Line

    E-Print Network [OSTI]

    Hess, George Wellman

    1911-05-01T23:59:59.000Z

    fG fW. 1911 (Mathematics) Representation of project ive space by the points o JL i-ii^5 • A REPRESENTATION OF PROJECTIVE SPACE BY THE POINTS OF A LINE. GEORGE TOLLMAN "BESS. A thesis submitted in partial fulfilment of the requirements...-to-one recipro- cal correspondence with the elements of another planar pencil, which may be either a pencil of points on the same line 1 or on a line distinct from 1 or a pencil of planar lines [l 1!. EJLfiSfif 'EfiCiSfifiaiixaiifia. If IF*] and [O1...

  18. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01T23:59:59.000Z

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  19. Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Office of Engineering.

    1992-05-01T23:59:59.000Z

    For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA`s Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

  20. EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

  1. EIS-0124: Conrad-Shelby Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

  2. EIS-0090: Fort Peck-Havre Transmission Line Project, Montana

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

  3. EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

  4. Towards Software Product Lines Application in the Context of a Smart Building Project

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    Towards Software Product Lines Application in the Context of a Smart Building Project Thibaut. This paper presents proposals on how to apply software prod- uct lines in the context of smart buildings the various components involved in smart buildings, and to capitalize on the devel- oped IT components

  5. Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Michael Lane

    Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

  6. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy savings in all sectors of the economy and together they have saved enough electricity through energy efficiency projects to power four large American cities....

  7. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    need coupled with an agreement for Portland General Electric to acquire Phase 2 of Puget Sound Energy's Lower Snake River Wind Project, which PGE renamed the Tucannon River...

  8. EIS-0312: Notice of Availability of the Bonneville Power Administratio...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Bonneville Power Administration Administrator's Record of Decision: Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe on Columbia Basin Fish...

  9. EIS-0030: Bonneville Power Administration's Proposed FY 1980 Program

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this EIS to evaluate the environmental impacts of the proposed fiscal year 1980 construction and maintenance program.

  10. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for tips about multiple incidents of insulators damaged by firearms on its high- voltage power line near Joint Base Lewis-McChord in Tacoma, Wash. Damaged insulators can put...

  11. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    will proceed as soon as this issue is resolved. #12;2 The second group includes seven projects groups ­ the first of which we intend to partially fund at this time. The second group includes projects, which we intend to fully fund when the specific requirements described below are met. The first group

  12. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    identified FY 2010 project-specific planning budgets for wildlife-related projects. These start-of-year (SOY) expense planning budgets were based on the FY 2009 levels plus a 2.5% adjustment for inflation. BPA's FY 2010 SOY capital planning budgets were primarily based on sponsor expectations for land acquisitions

  13. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 23, 2015 CONTACT: Doug Johnson, 503-230-5840503-230-5131 BPA and EnerNOC will test demand response for non-wires and peak load shaving Project tied to I-5 Corridor...

  14. Bonneville Power Administration Stephen J. (Steve) Wright, Administrator

    E-Print Network [OSTI]

    Administrator) on the eve of the West Coast energy crisis of 2000-2001. His tenure has spanned someBonneville Power Administration Stephen J. (Steve) Wright, Administrator Stephen J. Wright at the Bonneville Power Administration in the agency's conservation office as an entry-level GS-9. Today, he is BPA

  15. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    levels for the Action Agencies' implementation of the Pacific Northwest Electric Power and Conservation each of these agencies, states, and tribes to submit complementary recommendations under separate cover ­ to protect, mitigate and enhance fish and wildlife affected by federal and FERC-licensed hydro projects while

  16. EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)

    Broader source: Energy.gov [DOE]

    BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

  17. Project W-314 sn-630 transfer line az-02a to an-b acceptance for beneficial use

    SciTech Connect (OSTI)

    Warnick, T. L.

    1997-09-29T23:59:59.000Z

    Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

  18. Project W-314 sn-634 transfer line a-b to ax-b acceptance for beneficial use

    SciTech Connect (OSTI)

    Warnick, T. L.

    1997-09-29T23:59:59.000Z

    Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

  19. Fast-Track Design Efforts Using CFD: Bonneville Second Powerhouse

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Ebner, Laurie L.; Richmond, Marshall C.

    2007-10-10T23:59:59.000Z

    A set of three-dimensional, computational fluid dynamics (CFD) models were developed and used for the Bonneville Project tailrace to study the impact of a proposed outfall structure on the tailrace hydraulics; these structures were designed to improve the survival of downstream migrant (juvenile) salmon. Flows were simulated by solving the Reynolds-Averaged Navier-Stokes equations together with a two-equation k-epsilon turbulences model in a commercial CFD code. The numerical model was validated using field-measured velocity data. The model results identified undesirable combinations of outfall location and operational scenarios and helped to identify the location in which the outfall structure was built. The numerical model provided a relatively low-cost tool to rapidly simulate and visualize the flow field for multiple proposed outfall locations for a large number of operational scenarios. The visualizations of the results from the CFD model provided insights to hydraulic engineers and fisheries biologists working on the design and placement of the outfall structure.

  20. Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

  1. Water resources. Bureau of Reclamation's Bonneville Unit: future repayment arrangements

    SciTech Connect (OSTI)

    Not Available

    1986-03-01T23:59:59.000Z

    GAO is convinced that: the Bureau of Reclamation's use of the Water Supply Act of 1958 to defer a portion of municipal and industrial (M and I) costs of the Bonneville Unit was illegal, the Bureau's use of ad valorem (percentage of value) tax revenues from property owners to increase the Bonneville Unit's M and I customers repayment obligation under the 1965 contract was improper, and the Department of Energy Organization Act 1977 requires congressional approval of the modified cost allocation of the Bonneville Unit initiated by the Bureau in 1984.

  2. Line Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |Is Your HomeLatestCenter (LMI-EFRC) -Choices toLee FacultyLinda

  3. EIS-0097: Bonneville Power Administration Transmission Facilities Vegetation Management Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of various alternatives associated with implementing a vegetation management program.

  4. Bonneville Power Administration Overview As of December 1, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bonneville Power Administration Overview As of April 10, 2015 Moody's: Aa1Stable S&P: AA-Stable Fitch: AAStable Grand Coulee Dam High Voltage Transmission Columbia Generating...

  5. Bonneville Power Administration Overview As of December 1, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    80% of BPA's total firm power supply is carbon emission-free hydroelectric power * BPA's grid provides about 75% of the bulk transmission capacity in the Region Bonneville Power...

  6. Bonneville Power Administration Site Environmental Report, 1991.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-06-01T23:59:59.000Z

    In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  7. Bonneville Power Administration 1991 site environmental report

    SciTech Connect (OSTI)

    Not Available

    1992-06-01T23:59:59.000Z

    In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

  8. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  9. Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2000-06-23T23:59:59.000Z

    Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

  10. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado

    Broader source: Energy.gov [DOE]

    Western Area Power Administration (Western) – with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency – is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Western’s project website.

  11. Visualization of Flow Patterns in the Bonneville 2nd Powerhouse Forebay

    SciTech Connect (OSTI)

    Serkowski, John A.; Rakowski, Cynthia L.; Ebner, Laurie L.

    2002-12-31T23:59:59.000Z

    Three-dimensional (3D) computational fluid dynamics (CFD) models are increasingly being used to study forebay and tailrace flow systems associated with hydroelectric projects. This paper describes the fundamentals of creating effective 3D data visualizations from CFD model results using a case study from the Bonneville Dam. These visualizations enhance the utility of CFD models by helping the researcher and end user better understand the model results. To develop visualizations for the Bonneville Dam forebay model, we used specialized, but commonly available software and a standard high-end microprocessor workstation. With these tools we were able to compare flow patterns among several operational scenarios by producing a variety of contour, vector, stream-trace, and vortex-core plots. The differences in flow patterns we observed could impact efforts to divert downstream-migrating fish around powerhouse turbines.

  12. EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO

    Broader source: Energy.gov [DOE]

    Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

  13. Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration

    E-Print Network [OSTI]

    Grimsrud, David T.

    2009-01-01T23:59:59.000Z

    sponsored by Bonneville Power Administration under ContractReport prepared for Bonneville Power Administration, #85544.Report to Bonneville Power Administration D.T. Grimsrud,

  14. EIS-0093: Bonneville Power Administration's 1982 Rate Proposal

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration prepared this statement to evaluate the potential environmental impacts associated with an increase in wholesale power rates for calendar year 1982, including the effects of rate hikes in that year, the cumulative effects of rate hikes from 1979-1985, as well as alternative revenue scenarios.

  15. EIS-0102: Bonneville Power Administration's 1983 Wholesale Power Rate

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration prepared this EIS to evaluate the potential environmental impacts associated with an increase in wholesale power rates that would become effective on November 1, 1983, including the effects of rate hikes in that year and the cumulative effects of previous rate hikes.

  16. EIS-0031: Bonneville Power Administration 1979 Wholesale Rate Increase

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) developed this statement to explain the reasons for BPA's proposed power rate schedule, to conduct an analysis of the impacts which the proposal or alternatives thereto could have on both physical and socioeconomic characteristics of the human environment and to identify methods for mitigating the effects of the proposal.

  17. EIS-0162: Bonneville Power Administration (BPA) Resource Programs

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Bonneville Power Administration (BPA) developed this programmatic environmental impact statement to support decisions to be made in several future efforts to identify the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers.

  18. EIS-0095: Bonneville Power Administration's Expanded Residential Weatherization Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration prepared this statement to examine the environmental impacts of an expansion of the existing Residential Weatherization Program to include air-infiltration reducing (tightening) measures, such as storm windows and doors, insulation, weather-stripping and other improvements.

  19. The Sloan Digital Sky Survey Reverberation Mapping Project: Ensemble Spectroscopic Variability of Quasar Broad Emission Lines

    E-Print Network [OSTI]

    Sun, Mouyuan; Shen, Yue; Brandt, W N; Dawson, Kyle; Denney, Kelly D; Hall, Patrick B; Ho, Luis C; Horne, Keith; Jiang, Linhua; Richards, Gordon T; Schneider, Donald P; Bizyaev, Dmitry; Kinemuchi, Karen; Oravetz, Daniel; Pan, Kaike; Simmons, Audrey

    2015-01-01T23:59:59.000Z

    We explore the variability of quasars in the MgII and Hbeta broad emission lines and UV/optical continuum emission using the Sloan Digital Sky Survey Reverberation Mapping project (SDSS-RM). This is the largest spectroscopic study of quasar variability to date: our study includes 29 spectroscopic epochs from SDSS-RM over $6$ months, containing 357 quasars with MgII and 41 quasars with Hbeta . On longer timescales, the study is also supplemented with two-epoch data from SDSS-I/II. The SDSS-I/II data include an additional $2854$ quasars with MgII and 572 quasars with Hbeta. The MgII emission line is significantly variable ($\\Delta f/f$ 10% on 100-day timescales), indicating that it is feasible to use the broad MgII line for reverberation mapping studies. The data also confirm that continuum variability increases with timescale and decreases with luminosity, and the continuum light curves are consistent with a damped random-walk model on rest-frame timescales of $\\gtrsim 5$ days. We compare the emission-line and...

  20. Design and Manufacture of the RF Power Supply and RF Transmission Line for SANAEM Project Prometheus

    E-Print Network [OSTI]

    Turemen, G; Unel, G; Alacakir, A

    2015-01-01T23:59:59.000Z

    A 1-5 MeV proton beamline is being built by the Turkish Atomic Energy Authority in collaboration with a number of graduate students from different universities. The most important aspect of the project, is to acquire the design ability and manufacturing capability of all the components locally. SPP will be an accelerator and beam diagnostics test facility and it will also serve the detector development community with its low beam current. This paper discusses the design and construction of the RF power supply and the RF transmission line components such as its waveguide converters and its circulator.

  1. Environmental audit, Bonneville Power Administration, lower Columbia area

    SciTech Connect (OSTI)

    Not Available

    1990-11-01T23:59:59.000Z

    This report documents the results of the US Department of Energy's (DOE's) Environmental Audit conducted by the DOE Headquarters Office of Environmental Audit within the Bonneville Power Administration's (BPA's) Lower Columbia Area. The BPA facilities included in the Audit are the Ross Complex in Vancouver, Washington; the substations of North Bonneville, North Bonneville Annex, Camas, and Longview within the state of Washington; and the Acton and Troutdale Substations within the state of Oregon. The independent Audit was conducted by a team of professionals from DOE and contractors. The purpose of the Audit is to provide the Secretary of Energy, Admiral James D. Watkins, Ret., with the status of environmental programs within BPA's Lower Columbia Area. The Environmental Audit team identified 25 findings dealing with the lack of conformance with federal and state laws and regulations and DOE Orders, and 7 findings in which BMPs were not attained. Although all findings require corrective action, none required cessation of operations or reflect situations that present an immediate risk to public health or the environment. The Audit team noted inadequacies in PCB management included storage, labeling, reporting, and spill control. The most significant causal factors for the findings include lack of policy implementation throughout the Lower Columbia Area, inadequate training of personnel charged with environmental protection, lack of standard operating procedures for many programs, lack of reviews and appraisals, and an inaccurate perception of low risk for environmental concerns.

  2. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  3. Fort Peck-Havre transmission line project, Hill, Blaine, Phillips, Valley and McCone Counties, Montana

    SciTech Connect (OSTI)

    Not Available

    1982-09-01T23:59:59.000Z

    Construction and operation of a 180-mile, 230-kilovlt (kV) transmission line between Fort Peck and Havre, Montana is proposed to provide a replacement for the 161-kV line that currently runs between the two cities. The new line would be carried on woodpole, H-frame structures. The existing 161-kV line would be removed, and the Richardson Coulee Substation would be relocated. Intermediate facilities to be improved would include the Fort Peck Switchyard and the Richardson Coulee, Malta, Harlem, and Havre substations.Construction of the line would commence in August 1983, and operation would commence in January 1986. The expected life of the transmission system would be 100 years. Estimated cost of the project, in 1983 dollars, is $36.1 million. The project would upgrade an essential element of the Western Area Power Administration's electric power system and the Montana Power Company's interconnected transmission network. Continued electric service reliability would be improved, and safety conditions affecting personnel who maintain the line would be enhanced. Additional transmission capacity would be provided to accommodate future load growth, precluding the need for multiple transmission lines. The line would eleminate seven acres of productive land and create physical conflicts with present and future agricultural activities. The line would traverse areas characterized by concentrations of archaeological resources and cultural resources of importance to native Americans. Transmission structures could mar scenery in areas with historically significant architecture and would interfere with waterfowl.

  4. The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

    2009-09-01T23:59:59.000Z

    The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

  5. The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata

    SciTech Connect (OSTI)

    Fenner, Marsha W; Liolios, Konstantinos; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Kyrpides, Nikos C.

    2007-12-31T23:59:59.000Z

    The Genomes On Line Database (GOLD) is a comprehensive resource of information for genome and metagenome projects world-wide. GOLD provides access to complete and ongoing projects and their associated metadata through pre-computed lists and a search page. The database currently incorporates information for more than 2900 sequencing projects, of which 639 have been completed and the data deposited in the public databases. GOLD is constantly expanding to provide metadata information related to the project and the organism and is compliant with the Minimum Information about a Genome Sequence (MIGS) specifications.

  6. EIS-0005: Bonneville Power Administration FY 1979 Program

    Broader source: Energy.gov [DOE]

    This final statement is one of a series prepared annually by BPA on each fiscal year's proposed construction and maintenance program. This statement covers the potential impact of the major new facilities and maintenance programs proposed for fiscal year 1979. It must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report"" (The ""Role EIS""), particularly Appendix B - BFA Power Transmission.

  7. Comments of the Bonneville Power Administration | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'sEnergyTexas1.Space Data Corporation Comments ofthe Bonneville Power

  8. Me Stephen J. Wright Administrator Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHighand Retrievals from a NewCuneo Matthew1, 2012 1:00McPhD McPhD McPhD

  9. Bonneville Power Administration Overview As of December 1, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWPSuccess Stories Site MapSolar energy(cousin -in-lawHome PageBonneville

  10. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  11. Comment on the future of the Bonneville Power Administration Jim G. Likes, Thurston County, WA

    E-Print Network [OSTI]

    Comment on the future of the Bonneville Power Administration Jim G. Likes, Thurston County, WA Bonneville is a regional agency that markets federal hydropower and augments its power supply with market, everyday citizens, to pay illegally inflated power costs. Because of this, Bonneville should have the legal

  12. The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

  13. Evaluation of Salmon Spawning Below Bonneville Dam Annual Report October 2006 - September 2007.

    SciTech Connect (OSTI)

    Arntzen, Evan V.; Mueller, Robert P.; Murray, Katherine J.; Bott, Yi-Ju [Pacific Northwest National Laboratory

    2008-08-08T23:59:59.000Z

    From 1999 through 2007, the Fish and Wildlife Program of the Bonneville Power Administration funded a project to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Data were collected to ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. The projects objectives are consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Because of the influence of mainstem habitat on salmon production, there is a continued need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. During FY 2007, Pacific Northwest National Laboratory focused on (1) locating and mapping deep-water fall Chinook salmon and chum salmon spawning areas, (2) investigating the interaction between groundwater and surface water near fall Chinook and chum salmon spawning areas, and (3) providing in-season hyporheic temperature and water surface elevation data to assist state agencies with emergence timing and redd dewatering estimates. This report documents the studies and tasks performed by PNNL during FY 2007. Chapter 1 provides a description of the searches conducted for deepwater redds-adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emergence timing estimates and evaluations of redd dewatering.

  14. Announcement of Change in Public Meeting Location for the Northern Pass Transmission Line Project Published in the Federal Register

    Broader source: Energy.gov [DOE]

    The Department announces a change of location for the September 26, 2013 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. The meeting will be from 5 to 8 p.m.

  15. OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project

    Broader source: Energy.gov [DOE]

    On December 21, 2012, DOE’s Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

  16. Development of a special nuclear materials monitoring sensor pack for Project Straight-Line

    SciTech Connect (OSTI)

    Daily, M.R.; Moreno, D.J.; Tolk, K.M.; Wilcoxen, J.L. [Sandia National Labs., Albuquerque, NM (United States); Oetken, R.E.; Collins, J.E.; Miller, R.; Olsen, R.W. [Sandia National Labs., Livermore, CA (United States); Sheets, L. [Allied-Signal, Kansas City, MO (United States). Kansas City Division

    1995-12-31T23:59:59.000Z

    With the end of the Cold War and the accelerated dismantlement of nuclear weapons, the nuclear material inventory of the United States is growing. In addition, the United States has offered these excess weapons-grade nuclear material assets for international inspections with the intent of encouraging reciprocal action by other nations. In support of this policy, Sandia National Laboratories has initiated a pilot effort (Project Straight-Line) to develop a flexible, site-independent system to continuously and remotely monitor stored nuclear material and integrate the collection, processing, and dissemination of information regarding this material to ensure that declared nuclear materials placed in storage remain in place, unaltered, and stable. As part of this effort, a +3.6V battery powered, modular sensor pack has been developed to monitor total radiation dose, radiation dose rate, and the temperature of each nuclear material container and to provide this information using a standardized sensor interface. This paper will discuss the development of the sensors, the engineering and production of the sensor pack units, and their installation and operation at sites in New Mexico, California, and the Pantex plant in Amarillo.

  17. December 6, 2012 2013 Geographic Project Review

    E-Print Network [OSTI]

    and Conservation Council (Council) and Bonneville Power Administration (Bonneville) announce the start. Section 4(h)(10)(A) of the Power Act then calls on the Bonneville to use its funds and other authorities areas of the Columbia Basin for Fiscal Years 2014-2018 Dear Project Sponsors: The Northwest Power

  18. Bonneville Power Administration Overview As of December 1, 2014

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    750 million short-term expense line of credit with the U.S. Treasury (no outstanding balance) BPA's reserves available for risk combined with U.S. Treasury Line of Credit...

  19. Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

    2005-06-01T23:59:59.000Z

    This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

  20. Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam

    SciTech Connect (OSTI)

    Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

    2009-01-29T23:59:59.000Z

    At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

  1. 2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles

    E-Print Network [OSTI]

    Leung, Victor C.M.

    .M. Leung (vleung@ece.ubc.ca) 1. Project description In today's electric and conventional combustion engine

  2. Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-06-20T23:59:59.000Z

    BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

  3. Power Line Damage, Electrical Outages Reduced in the ''Sleet Belt'': NICE3 Steel Project Fact Sheet

    SciTech Connect (OSTI)

    NONE

    2000-04-25T23:59:59.000Z

    The AR Windamper System was developed through a grant from the Inventions and Innovation Program, to protect power transmission lines in sleet belt states and provinces by eliminating the ''galloping'' phenomenon. Wind damping products minimize power outages and reduce repair costs to transmission lines.

  4. EA-0513: Approaches for Acquiring Energy Savings in Commercial Sector Buildings, Bonneville Power Administration

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal for DOE's Bonneville Power Administration to use several diverse approaches to purchase or acquire energy savings from commercial sector...

  5. A new full-color book goes behind the scenes at the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 14 BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE Wednesday, Oct. 1, 2014 CONTACT: Kevin Wingert, 503-230-4140503-230-5131 BPA Regional Science Bowl Registration Opens...

  6. United States Government Department of Energy Bonneville Power...

    Broader source: Energy.gov (indexed) [DOE]

    and in Nez Perce County in Idaho (see map). The fiber would be strung on seven transmission lines and run through five substations. Section 1 would extend from Franklin...

  7. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01T23:59:59.000Z

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  8. Evaluation of Canal Lining Projects in the Lower Rio Grande Valley

    E-Print Network [OSTI]

    Karimov, Askar; Leigh, Eric; Fipps, Guy

    Since 1999, seven (7) irrigation districts in the Lower Rio Grande Valley of Texas have installed six (6) different types of synthetic canal lining materials, totaling approximately 21 miles. In 2005, we began a program to track the long...

  9. EIS-0332: McNary-John Day Transmission Line Project, OR

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

  10. EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western’s transmission system.

  11. Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study

    SciTech Connect (OSTI)

    Cook, Christopher B.; Richmond, Marshall C.; Guensch, Gregory R.

    2001-03-20T23:59:59.000Z

    The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating.

  12. EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S.ContaminationJuly 2011DDelphiFEA-2013.pdfBasedTheCounty, Idaho | Department

  13. EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California

    Broader source: Energy.gov [DOE]

    The Department of the Interior’s Bureau of Indian Affairs considered preparing this EA, with DOE’s Western Area Power Administration as a cooperating agency. This project has been canceled.

  14. Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory

    SciTech Connect (OSTI)

    Lee, A.D.; Conger, R.L.

    1996-06-01T23:59:59.000Z

    The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

  15. EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service’s construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

  16. EIS-0005-S2: Bonneville Power Administration Proposed FY 1979 Program Facility Planning Supplement Southwest Oregon Area Service, Supplemental

    Broader source: Energy.gov [DOE]

    This statement, one of a series prepared by the U.S. Department of Energy’s Bonneville Power Administration on various facets of its construction and maintenance activities, addresses the potential impact of a major new facility proposed for fiscal year 1979. To allow power generated in Wyoming to be delivered to Southwest Oregon and to facilitate the exchange of electric power between the Pacific Northwest and the Middle Snake region, two basic plans of service, each with two corridor routing options, have been identified to meet system requirements. BPA proposes construction of the following two transmission facilities: (1) a 500-kV line from Idaho Power Company's Brownlee Substation in Idaho to BPA's Slatt Substation near Arlington, Oregon, and (2) a 500-kV line from Buckley (near Maupin, Oregon) to Malin, Oregon. This statement must be reviewed and used in conjunction with the overall programmatic environmental statement entitled ""The Role of the Bonneville Power Administration in the Pacific Northwest Power Supply System, Including Its Participation in the Hydro-Thermal Power Program: A Program Environmental Statement and Planning Report (The ""Role EIS""), particularly Appendix B - BPA Power Transmission.

  17. EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York

    Broader source: Energy.gov [DOE]

    This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

  18. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  19. EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

  20. Evaluation of Juvenile Salmon Behavior at Bonneville Dam, Columbia River, Using a Multibeam Technique

    SciTech Connect (OSTI)

    Johnson, Robert L. (BATTELLE (PACIFIC NW LAB)); Moursund, Russell A. (BATTELLE (PACIFIC NW LAB))

    1999-11-01T23:59:59.000Z

    In recent years, with increased effort to bypass and guide fragile stocks of juvenile salmon in the Columbia Basin past hydroelectric projects, it has been increasingly important to obtain fine-scale fish behavior data in a non-intrusive manner. The Dual-Head Multibeam Sonar is an emerging technology for fisheries applications that addresses that requirement. It has two principal advantages over traditional hydroacoustic techniques: (1) it allows for simultaneous large-volume coverage of a region of interest, and (2) it affords 3-D tracking capability. The use of Dual-Head Multibeam Sonar in this study resulted in unprecedented insight into fine-scale smolt behavior upstream of a prototype surface collector at Bonneville Dam first powerhouse in 1998. Our results indicated that outmigrant juvenile salmon had an increased likelihood of milling or holding. This discovery will lead to better design criteria for future bypass and collector systems. Future fisheries multibeam sonar systems will likely be fully integrated systems with built-in real time tracking capability. These systems may be used to track targets relative to physical guidance structures or other behavior modifying stimuli such as light, turbulent flow, electrical/magnetic fields, or low-frequency sound and vibration. The combination of fine-scale fish behavior data and environmental parameters will yield better design criteria for the safe passage of listed or endangered species of Pacific salmon.

  1. Tradeoffs for Efficiently Passing Juvenile Salmonids through Bonneville Dam on the Lower Columbia River

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Kim, Jina

    2008-12-01T23:59:59.000Z

    We analyzed five years of route-specific fish-passage data acquired by fixed-aspect hydroacoustic sampling of juvenile salmonids passing downstream through Bonneville Dam. High passage effectiveness of surface-flow outlets relative to the spillway and turbines suggests that juvenile salmonids are preferentially selecting surface outlets over adjacent turbines. Seasonal estimates showed that median combined effectiveness of surface-flow outlets (7.8) was 7.1 times higher than that of the spillway (1.1) and 9.8 times higher than that of turbines (0.8). Islands prevent the spillway from attracting fish from either powerhouse, something that may occur at other projects. Regressions indicated that percent flow passing a specific route explained from 50 to 97% of fish-passage variation, and relations were useful for evaluating fish-passage alternatives. Fitted curves for surface-passage routes, including the sluiceway at Powerhouse 1 (B1) and Powerhouse 2 (B2) were much steeper at low percent low (2-15%) than were curves for the spillway or turbines. Regressions indicate that increasing surface-flow percentages of B1 flow from 1% to 10% could increase B1 sluiceway-passage efficiency from 40% to 83%. Increasing B2 flow to the B2 sluiceway from 4% to 15% could increase fish passage from 31% to 62%. Without spill, about 50% of fish passed by non-turbine routes.

  2. Plains & Eastern Clean Line Project Proposal for New or Upgraded

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO2:Introduction toManagementOPAM5Parabolic TroughPhotoCell StructureUraniumTransmission Line

  3. EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County,

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S.ContaminationJuly 2011DDelphiFEA-2013.pdfBased onFinalLine, Benton and

  4. EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China U.S.ContaminationJuly 2011DDelphiFEA-2013.pdfBased onFinalLine,DOEPolson, Montana |

  5. Quantum LDPC Codes Constructed from Point-Line Subsets of the Finite Projective Plane

    E-Print Network [OSTI]

    Jacob Farinholt

    2012-07-03T23:59:59.000Z

    Due to their fast decoding algorithms, quantum generalizations of low-density parity check, or LDPC, codes have been investigated as a solution to the problem of decoherence in fragile quantum states. However, the additional twisted inner product requirements of quantum stabilizer codes force four-cycles and eliminate the possibility of randomly generated quantum LDPC codes. Moreover, the classes of quantum LDPC codes discovered thus far generally have unknown or small minimum distance, or a fixed rate. This paper presents several new classes of quantum LDPC codes constructed from finite projective planes. These codes have rates that increase with the block length $n$ and minimum weights proportional to $n^{1/2}$.

  6. With the onset of fall and the return of school, the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tuesday, Nov. 26, 2013 CITY OF SALEM Nicole Miller, 503-540-2415 OREGON DEPARTMENT OF FISH & WILDLIFE Meg Kenagy, 503-947-6021 BONNEVILLE POWER ADMINISTRATION Kevin Wingert,...

  7. The Future Role of the Bonneville Power Administration in Power Supply

    E-Print Network [OSTI]

    repayment at risk, the pressure for "reform," such as privatization, intensifies. Over the last decade costs are 1 E.g. see Rethinking Bonneville ­ Why BPA Must Be Reformed, Richard Munson, Northeast

  8. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2012-09-01T23:59:59.000Z

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  9. Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

    2011-02-01T23:59:59.000Z

    The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

  10. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01T23:59:59.000Z

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  11. Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR

    SciTech Connect (OSTI)

    Miller, Naomi

    2011-07-01T23:59:59.000Z

    This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

  12. Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008

    SciTech Connect (OSTI)

    Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

    2009-09-01T23:59:59.000Z

    This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

  13. IMPEE PhD Opportunity Project title: LightFoot PhD A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal

    E-Print Network [OSTI]

    Greenaway, Alan

    IMPEE PhD Opportunity Project title: LightFoot PhD ­ A PhD Investigation Lightning Protection of HV.swingler@hw.ac.uk Abstract LightFoot PhD ­ A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal Tower Footing Resistance funded by SSE. The LightFoot PhD project takes a fresh approach at adding

  14. Sixth Northwest Conservation and Electric Power Plan Chapter 13: Bonneville's Obligations

    E-Print Network [OSTI]

    's balancing area. Its obligations to provide flexibility for wind-power balancing also are driven by its obligations under NERC standards as the host balancing authority for wind-power resources that are meeting of wind power that is located in Bonneville's balancing area whether to serve its customers, other

  15. AN ESTIMATE OF MORTALITY OF CHINOOK SALMON IN THE COLUMBIA RIVER NEAR BONNEVILLE DAM DURING THE

    E-Print Network [OSTI]

    AN ESTIMATE OF MORTALITY OF CHINOOK SALMON IN THE COLUMBIA RIVER NEAR BONNEVILLE DAM DURING Dam and studied t!:te probable causes of death. The estimates of numbers of dead fish were made from ratios of tagged to untagged floating carcasses below the dam. Tagged s!llmon carcasses were released

  16. Re-Analysis of Hydroacoustic Fish-Passage Data from Bonneville Dam after Spill-Discharge Corrections

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Kim, Jina; Weiland, Mark A.; Hughes, James S.; Fischer, Eric S.

    2007-06-07T23:59:59.000Z

    The U.S. Army Corps of Engineers - Portland District asked Pacific Northwest National Laboratory to re-analyze four years of fixed-aspect hydroacoustic data after the District made adjustments to spill discharge estimates. In this report, we present new estimates of all major fish-passage metrics for study years 2000, 2001, 2002, and 2004, as well as estimates for 2005. This study supports the Portland District and its effort to maximize survival of juvenile salmon passing Bonneville Dam. Major passage routes through Bonneville Dam include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines at Powerhouse 2 (B2) and a sluiceway including the B2 Corner Collector. The original reports and all associated results, discussion, and conclusions for non flow-related metrics remain valid and useful, but effectiveness measures for study years 2000, 2001, 2002, and 2004 as reported in previous reports by Ploskey et al. should be superseded with the new estimates reported here. The fish-passage metrics that changed the most were related to effectiveness. Re-analysis produced spill effectiveness estimates that ranged from 12% to 21% higher than previous estimates in spring and 16.7% to 27.5% higher in summer, but the mean spill effectiveness over all years was only slightly above 1:1 (1.17 for spring and 1.29 for summer). Conversely surface-passage effectiveness decreased in the years this metric was measured (by 10.1% in spring and 10.7% in summer of 2002 and 9.5% in spring and 10.2% in summer of 2004). The smallest changes in the re-analysis were in project fish passage efficiency (0%-1%) and spill efficiency (0.9%-3.0%).

  17. Bonneville Powerhouse 2 Fish Guidance Efficiency Studies: CFD Model of the Forebay

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.

    2012-07-01T23:59:59.000Z

    In ongoing work, U.S. Army Corps of Engineers, Portland District (CENWP) is seeking to better understand and improve the conditions within the Bonneville Powerhouse 2 (B2) turbine intakes to improve survival of downstream migrant salmonid smolt. In this study, the existing B2 forebay computational fluid dynamics (CFD) model was modified to include a more detailed representation of all B2 turbine intakes. The modified model was validated to existing field-measured forebay ADCP velocities. The initial CFD model scenarios tested a single project operation and the impact of adding the Behavior Guidance System (BGS) or Corner Collector. These structures had impacts on forebay flows. Most notable was that the addition of the BGS and Corner Collector reduced the lateral extent of the recirculation areas on the Washington shore and Cascade Island and reduced the flow velocity parallel to the powerhouse in front of Units 11 and 12. For these same cases, at the turbine intakes across the powerhouse, there was very little difference in the flow volume into the gatewell for the clean forebay, and the forebay with the BGS in place and/or the Corner Collector operating. The largest differences were at Units 11 to 13. The CFD model cases testing the impact of the gatewell slot fillers showed no impact to the forebay flows, but large differences within the gatewells. With the slot fillers, the flow above the standard traveling screen and into the gatewell increased (about 100 cfs at each turbine intake) and the gap flow decreased across the powerhouse for all cases. The increased flow up the gatewell was further enhanced with only half the units operating. The flow into the gatewell slot was increased about 35 cfs for each bay of each intake across the powerhouse; this change was uniform across the powerhouse. The flows in the gatewell of Unit 12, the most impacted unit for the scenarios, was evaluated. In front of the vertical barrier screen, the CFD model with slot fillers showed reduced the maximum velocities (in spite of the increased the flow into the gatewell), and decreased the area of recirculation. The area near the VBS exceeding the normal velocity criteria of 1 ft/s was reduced and the flows were more balanced.

  18. Record of Decision for the Electrical Interconnection of the Windy Point Wind Energy Project.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    2006-11-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of 250 megawatts (MW) of power to be generated by the proposed Windy Point Wind Energy Project (Wind Project) into the Federal Columbia River Transmission System (FCRTS). Windy Point Partners, LLC (WPP) propose to construct and operate the proposed Wind Project and has requested interconnection to the FCRTS. The Wind Project will be interconnected at BPA's Rock Creek Substation, which is under construction in Klickitat County, Washington. The Rock Creek Substation will provide transmission access for the Wind Project to BPA's Wautoma-John Day No.1 500-kilovolt (kV) transmission line. BPA's decision to offer terms to interconnect the Wind Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 15, 1995). This decision thus is tiered to the BP ROD.

  19. Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

    2013-05-01T23:59:59.000Z

    The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

  20. The Use and Benefits of Video Inspection in Lined and Unlined Ductwork in IAQ Surveys and "Source Removal" Cleaning Projects

    E-Print Network [OSTI]

    Kiec, T. M.

    New technology has developed video equipment capable of inspecting interior lined and unlined ductwork. Where IAQ (Indoor Air Quality) questions require inspections of suspicious air conveyance systems. Video recordings provide useful information...

  1. Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop

    SciTech Connect (OSTI)

    Galarowicz, James

    2014-01-06T23:59:59.000Z

    In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project team’s work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASC’s Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

  2. Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program Environmental Impact Statement

    SciTech Connect (OSTI)

    Glantz, C S; Burk, K W; Driver, C J; Liljegren, J C; Neitzel, D A; Schwartz, M N; Dana, M T; Laws, G L; Mahoney, L A; Rhoads, K

    1992-04-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives.

  3. Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)

    SciTech Connect (OSTI)

    Muons, Inc.

    2011-05-19T23:59:59.000Z

    This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the companyâ??s continued success and growth is directly related to our expertise in applying this program to interesting applications.

  4. Modeling uncertainty in the New York City no. 7 subway line extension project using Decision Aids for Tunnelling (DAT)

    E-Print Network [OSTI]

    Hung, Vinnie

    2012-01-01T23:59:59.000Z

    Given the frequent cost overruns and schedule delays associated with underground construction projects, it is imperative that a detailed estimate of both be developed and considered prior to starting construction. The ...

  5. Bonneville Powerhouse 2 3D CFD for the Behavioral Guidance System

    SciTech Connect (OSTI)

    Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.

    2010-02-01T23:59:59.000Z

    In 2008 and 2009, a 700 ft long, 10-ft deep floating forebay guidance wall called a behavioral guidance structure (BGS) was deployed in the Bonneville Powerhouse 2 forebay. The US Army Corps of Engineers, Portland District (CENWP) contracted with the Pacific Northwest National Laboratory (PNNL) to develop computational tools to assess the impact of the BGS on forebay hydraulics (this study). The tools developed here to provide a characterization of forebay hydraulics to be integrated with acoustic telemetry studies designed to measure the impact on juvenile salmon guidance and survival through Bonneville Powerhouse 2. In previous work, PNNL performed computational fluid dynamics (CFD) studies for the Bonneville forebay for CENWP. In this study, the existing model was modified to include the BGS. The model included a bay-by-bay spillway, a truncated Powerhouse 1 forebay, Powerhouse 2 turbine intakes and corner collector, and the forebay bathymetry extending approximately 1.5km upstream from the tip of Cascade Island. Model validation outcomes were similar to that of past studies. Additional checks were included on the impact of the differencing scheme to flow solution. It was found that using upwind differencing was adequate and it was possible to use a truncated computational mesh of this model that included a BGS upstream of Powerhouse 2 and increased spatial resolution in the vicinity of the BGS. This model has been validated, run, and provided to CENWP to use for additional analysis of the Powerhouse 2 forebay hydraulics. The PNNL particle tracking software (PT6) was used to assess the impacts of mass and relative buoyancy on particle fate. The particle tracker was run for the Half Load case for the clean forebay and for the forebay with the BGS in place and the Corner Collector on. All tracker cases showed that the BGS moved the particles across the forebay increasing the number of particles exiting the model through the Corner Collector and (for streamlines and neutrally-buoyant particles) the lower numbered turbine units.

  6. Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

    2009-12-28T23:59:59.000Z

    This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

  7. Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

    2008-12-01T23:59:59.000Z

    The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

  8. EL11-44 Compliance Filing of the Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEA :Work withJerseyMarketsWhy Report419: Record ofOF

  9. Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008

    SciTech Connect (OSTI)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

    2010-02-12T23:59:59.000Z

    Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

  10. Klondike III/Biglow Canyon Wind Integration Project; Record of Decision, October 25, 2006.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration

    2006-10-25T23:59:59.000Z

    The Bonneville Power Administration (BPA) has decided to implement the Proposed Action identified in the Klondike III/Biglow Canyon Wind Integration Project Final Environmental Impact Statement (FEIS) (DOE/EIS-0374, September 2006). Under the Proposed Action, BPA will offer PPM Energy, Inc. (PPM) contract terms for interconnection of the proposed Klondike III Wind Project, located in Sherman County, Oregon, with the Federal Columbia River Transmission System (FCRTS). BPA will also offer Portland General Electric (PGE)1 contract terms for interconnection of its proposed Biglow Canyon Wind Farm, also located in Sherman County, Oregon, with the FCRTS, as proposed in the FEIS. To interconnect these wind projects, BPA will build and operate a 12-mile long, 230-kilovolt (kV) double-circuit transmission line between the wind projects and BPA's new 230-kV John Day Substation in Sherman County, Oregon. BPA will also expand its existing 500-kV John Day Substation.

  11. Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009

    SciTech Connect (OSTI)

    Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

    2011-03-01T23:59:59.000Z

    Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  12. EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration so that WAPA could supplement it in support of WAPA’s National Environmental Policy Act requirements for a related project.

  13. Critical in PROJECT TITLE COMMENTS BPA NPCC

    E-Print Network [OSTI]

    PLANNING AND CONSERVATION COUNCIL AND BONNEVILLE POWER ADMINISTRATION "RANKINGS" FOR PROJECTS UNDER in annual planning budget and feasibility of approach to achieve efficiencies. BPA reduced by $250PROJECT NUMBER (BiOp Critical in Italics) PROJECT TITLE COMMENTS BPA NPCC 35019 Develop

  14. Type B Accident Investigation Board Report on the July 25, 1997, Contract Brush Cutter Injury on the Ashe-Marion #2 500 kV Line

    Broader source: Energy.gov [DOE]

    On July 25, 1997, at 1205 hours, a contract hand brush cutter was seriously injured when he felled a tree close to a Bonneville Power Administration energized transmission power line, located within a BPA transmission-line corridor.

  15. EIS-0008-S: Supplement, Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this SEIS to evaluate the environmental impacts of construction of a steel double-circuit 345-kilovolt transmission line from Moore Substation near Littleton, New Hampshire, to Comerford Substation near Monroe, New Hampshire and a 345-kilovolt wood pole transmission line from Comerford Substation to Webster Substation near Franklin, New Hampshire, as part of the Dickey-Lincoln School Lakes Transmission Project. The Final SEIS consists entirely of Section 9 (Consultation and Coordination), which incorporates public and agency comments on the Draft SEIS and responses to those comments, as well as all necessary errata and addenda to the Draft SEIS. This SEIS is a supplement to DOE/EIS-008, Dickey-Lincoln School Lakes Transmission Project.

  16. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2011

    SciTech Connect (OSTI)

    Ploskey, Gene R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Batten, G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Cushing, Aaron W. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Kim, Jin A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Johnson, Gary E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Skalski, J. R. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Townsend, Richard L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Seaburg, Adam [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Weiland, Mark A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Woodley, Christa M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hughes, James S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carlson, Thomas J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Carpenter, Scott M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Deng, Zhiqun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Etherington, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fischer, Eric S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fu, Tao [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Greiner, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hennen, Matthew J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Martinez, Jayson J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mitchell, T. D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Rayamajhi, Bishes [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zimmerman, Shon A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2013-02-15T23:59:59.000Z

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2011. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon using a virtual release, paired reference release survival model. This study supports the U.S. Army Corps of Engineers’ continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  17. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

    2011-12-01T23:59:59.000Z

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  18. Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

    2012-09-01T23:59:59.000Z

    Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

  19. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 85% Cleanup EVM represents Earned Value Management. FY2011 Second Quarter Overall Contract and Project Management Improvement...

  20. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 Fourth Quarter Overall Contract and Project Management Improvement...

  1. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 100% Line Item 88% Cleanup EVM represents Earned Value Management. FY2011 First Quarter Overall Contract and Project Management Performance...

  2. Contract/Project Management

    Energy Savers [EERE]

    by FY12. 95% Line Item 85% Cleanup 97% Line Item 89% Cleanup EVM represents Earned Value Management. FY2011 Third Quarter Overall Contract and Project Management Improvement...

  3. Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003

    SciTech Connect (OSTI)

    Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

    2005-02-01T23:59:59.000Z

    This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

  4. Wide-Area Energy Storage and Management system to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Yang, Bo; DeSteese, John G.; Lu, Shuai; Miller, Carl H.; Nyeng, Preben; Ma, Jian; Hammerstrom, Donald J.; Vishwanathan, Vilanyur V.

    2008-06-30T23:59:59.000Z

    The entire project addresses the issue of mitigating additional intermittency and fast ramps that occur at higher penetration of intermittent resources, including wind genera-tion, in the Bonneville Power Administration (BPA) and the California Independent Sys-tem Operator (California ISO) control areas. The proposed Wide Area Energy Storage and Management System (WAEMS) will address the additional regulation requirement through the energy exchange between the participating control areas and through the use of energy storage and other generation resources. For the BPA and California ISO control centers, the new regulation service will look no different comparing with the traditional regulation resources. The proposed project will benefit the regulation service in these service areas, regardless of the actual degree of penetration of the intermittent resources in the regions. The project develops principles, algorithms, market integration rules, functional de-sign and technical specifications for the WAEMS system. The project is sponsored by BPA and supported in kind by California ISO, Beacon Power Corporation, and the Cali-fornia Energy Commission (CEC).

  5. Planning and Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rates Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

  6. Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking

    SciTech Connect (OSTI)

    Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

    2001-05-01T23:59:59.000Z

    This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

  7. Monitoring and Evaluation of the Prototype Surface Collector at Bonneville First Powerhouse in 2000: Synthesis of Results

    SciTech Connect (OSTI)

    Johnson, Gary E.; Carlson, Thomas J.

    2001-06-01T23:59:59.000Z

    This report describes research done to evaluate the Prototype Surface Collector at Bonneville Dam, Powerhouse I, on the Columbia River. The surface collector is being evaluated as a means for bringing downstream migrating salmon and steelhead through the powerhouse while avoiding the turbines. The report describes evaluations conducted by PNNL, National Marine Fisheries Service, and various contractors using radio telemetry, hydroacoustics, and computational fluid dynamics models. The evaluation will provide information to the U.S. Army Corps of Engineers for their 2001 decision on whether to use surface flow bypass or extended-length submersible bar screens for long-term smolt passage at Bonneville Dam.

  8. Corona performance of a compact 230-kV line

    SciTech Connect (OSTI)

    Chartier, V.L.; Blair, D.E. [Bonneville Power Administration, Vancouver, WA (United States). Division of Laboratories; Easley, M.D.; Raczkowski, R.T. [Puget Sound Power and Light Co., Bellevue, WA (United States)

    1994-12-31T23:59:59.000Z

    Permitting requirements and the acquisition of new rights-of-way for transmission facilities has in recent years become increasingly difficult for most utilities, including Puget Sound Power and Light Company. In order to maintain a high degree of reliability of service while being responsive to public concerns regarding the siting of high voltage (HV) transmission facilities, Puget Power has found it necessary to more heavily rely upon the use of compact lines in franchise corridors. Compaction does, however, precipitant increased levels of audible noise (AN) and radio and TV interference (RI and TVI) due to corona on the conductors and insulator assemblies. Puget Power relies upon the Bonneville Power Administration (BPA) Corona and Field Effects computer program to calculate AN and RI for new lines. Since there was some question of the program`s ability to accurately represent quiet 230-kV compact designs, a joint project was undertaken with BPA to verify the program`s algorithms. Long-term measurements made on an operating Puget Power 230-kV compact line confirmed the accuracy of BPA`s AN model; however, the RI measurements were much lower than predicted by the BPA computer and other programs. This paper also describes how the BPA computer program can be used to calculate the voltage needed to expose insulator assemblies to the correct electric field in single test setups in HV laboratories.

  9. Corona performance of a compact 230-kV line

    SciTech Connect (OSTI)

    Chartier, V.L.; Blair, D.E. [Bonneville Power Administration, Vancouver, WA (United States). Division of Labs.] [Bonneville Power Administration, Vancouver, WA (United States). Division of Labs.; Easley, M.D.; Raczkowski, R.T. [Puget Sound Power and Light Co., Bellevue, WA (United States)] [Puget Sound Power and Light Co., Bellevue, WA (United States)

    1995-01-01T23:59:59.000Z

    Permitting requirements and the acquisition of new rights-of-way for transmission facilities has in recent years become increasingly difficult for most utilities, including Puget Sound Power and Light Company. In order to maintain a high degree of reliability of service while being responsive to public concerns regarding the siting of high voltage (HV) transmission facilities, Puget Power has found it necessary to more heavily rely upon the use of compact lines in franchise corridors. Compaction does, however, precipitate increased levels of audible noise (AN) and radio and TV interference (RI and TVI) due to corona on the conductors and insulator assemblies. Puget Power relies upon the Bonneville Power Administration (BPA) Corona and Field Effects computer program to calculate AN and RI for new lines. Since there was some question of the program`s ability to accurately represent quiet 230-kV compact designs, a joint project was undertaken with BPA to verify the program`s algorithms. Long-term measurements made on an operating Puget Power 230-kV compact line confirmed the accuracy of BPA`s AN model; however, the RI measurements were much lower than predicted by the BPA and other programs. This paper also describes how the BPA computer program can be used to calculate the voltage needed to expose insulator assemblies to the correct electric field in single test setups in HV laboratories.

  10. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-03-01T23:59:59.000Z

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  11. Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011

    SciTech Connect (OSTI)

    Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

    2012-06-07T23:59:59.000Z

    The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

  12. EIS-0471: Department of Energy Loan Guarantee to Support Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho

    Broader source: Energy.gov [DOE]

    This EIS evaluates the environmental impacts of construction, operation, and decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County, Idaho. (DOE adopted this EIS issued by NRC on 04/13/2007.)

  13. Nuclear Energy Research Initiative Project No. 02 103 Innovative Low Cost Approaches to Automating QA/QC of Fuel Particle Production Using On Line Nondestructive Methods for Higher Reliability Final Project Report

    SciTech Connect (OSTI)

    Ahmed, Salahuddin; Batishko, Charles R.; Flake, Matthew; Good, Morris S.; Mathews, Royce; Morra, Marino; Panetta, Paul D.; Pardini, Allan F.; Sandness, Gerald A.; Tucker, Brian J.; Weier, Dennis R.; Hockey, Ronald L.; Gray, Joseph N.; Saurwein, John J.; Bond, Leonard J.; Lowden, Richard A.; Miller, James H.

    2006-02-28T23:59:59.000Z

    This Nuclear Energy Research Initiative (NERI) project was tasked with exploring, adapting, developing and demonstrating innovative nondestructive test methods to automate nuclear coated particle fuel inspection so as to provide the United States (US) with necessary improved and economical Quality Assurance and Control (QA/QC) that is needed for the fuels for several reactor concepts being proposed for both near term deployment [DOE NE & NERAC, 2001] and Generation IV nuclear systems. Replacing present day QA/QC methods, done manually and in many cases destructively, with higher speed automated nondestructive methods will make fuel production for advanced reactors economically feasible. For successful deployment of next generation reactors that employ particle fuels, or fuels in the form of pebbles based on particles, extremely large numbers of fuel particles will require inspection at throughput rates that do not significantly impact the proposed manufacturing processes. The focus of the project is nondestructive examination (NDE) technologies that can be automated for production speeds and make either: (I) On Process Measurements or (II) In Line Measurements. The inspection technologies selected will enable particle “quality” qualification as a particle or group of particles passes a sensor. A multiple attribute dependent signature will be measured and used for qualification or process control decisions. A primary task for achieving this objective is to establish standard signatures for both good/acceptable particles and the most problematic types of defects using several nondestructive methods.

  14. EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 34-mile Midway-Moxee transmission line in Benton and Yakima Counties, Washington.

  15. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...

    Broader source: Energy.gov (indexed) [DOE]

    EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

  16. With the onset of fall and the return of school, the Bonneville...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OR 97291-4428 Fax: 503-230-4019 Email: comments@bpa.gov Phone: 800-622-4519 (toll-free) Please refer to Wallooskee-Youngs Confluence Restoration Project when leaving a...

  17. Revised Record of Decision for the Electrical Interconnection of the Summit/Westward Project

    SciTech Connect (OSTI)

    N /A

    2004-10-21T23:59:59.000Z

    The Bonneville Power Administration (BPA) has decided to amend its July 25, 2003, Record of Decision (ROD) regarding the proposed Summit/Westward Project (Project) to offer contract terms for an optional interconnection of this Project into the Federal Columbia River Transmission System (FCRTS). Under this optional interconnection plan, BPA would integrate electric power from the Project into the FCRTS at a point adjacent to Clatskanie People's Utility District (CPUD) existing Wauna Substation. In order to deliver power to this location, CPUD would develop a new substation (Bradbury Substation) at a site near the Project and a new 230-kV transmission line from there to CPUD's Wauna Substation, which is already connected to the FCRTS. As part of this revised decision, BPA will facilitate CPUD development of the Bradbury-Wauna transmission line by allowing joint use of BPA right-of-way. This will involve reconstructing a section of BPA's 115-kV Allston-Astoria No. 1 transmission line from single-circuit H-frame wood-pole design to double-circuit single metal pole design. Terms of BPA participation in CPUD's development of the Bradbury-Wauna transmission line will be documented in a Construction Agreement. This optional interconnection plan is in addition to BPA's previous offer for interconnection of the Project at BPA's Allston Substation, as documented in the July 25, 2003, ROD. As with the initial interconnection plan, the decision to offer terms to interconnect the Project through the optional interconnection plan is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan Record of Decision (BP ROD, August 1995). This decision thus is similarly tiered to the Business Plan ROD.

  18. Bonneville Power Administration, Lower Columbia Region: Noxious Weed Management, 1996 Annual Report.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration, Portland, OR; Oregon Department of Agriculture Noxious Weed Control Program

    1996-01-01T23:59:59.000Z

    During the 1996 season ODA executed the contract between BPA and ODA. Execution of this contract included the following activities: Survey for target noxious weeds, such as Gorse; collection and redistribution of biological control agents, for example, Apion seed weevils for Scotch broom, bioagents for diffuse and spotted knapweed, Gorse spider mite, and gall fly releases for control of Canada thistle and bull thistle; and control of isolated infestations of Gorse on BPA rights-of-way. Training was provided for line crews at the Chemawa, Alevy and North Bend districts. The purpose of the program is to assist BPA in the integrated prevention and control of noxious weed species on BPA transmission line maintenance right-of-ways.

  19. EIS-0008: Dickey-Lincoln School Lakes Transmission Project, Maine, New Hampshire, and Vermont

    Broader source: Energy.gov [DOE]

    The U.S. Army Corps of Engineers and the U.S. Department of Energy's Bonneville Power Administration developed this statement to evaluate the environmental impacts of the Dickey-Lincoln School Lakes Transmission Project.

  20. Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids

    SciTech Connect (OSTI)

    Mueller, Robert P.; Simmons, Mary Ann

    2007-12-29T23:59:59.000Z

    The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluated—light-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

  1. EIS-0118: Proposed Eugene-Medford 500-kV Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Interior developed this statement to assess the environmental impact of a proposed 500-kilovolt transmission line linking Eugene and Medford, Oregon, that would cross through public lands. The Bonneville Power Administration (BPA) would provide service to the proposed line and is a cooperating agency in the statement. BPA adopted the EIS on 7/10/1985.

  2. Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

    TR-202 October 2002 Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 – Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery... Canals, and On-Farm Delivery-Site Meters M. Edward Rister Ronald D. Lacewell Allen W. Sturdivant John R. C. Robinson Michael C. Popp John R. Ellis Texas Water Resources Institute Texas A&M University TR-202 October 2002 Economic and Conservation...

  3. EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management and the U.S. Forest Service are preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct about 305 miles of 500-kV transmission line from northeast Oregon to southwest Idaho. BPA’s proposed action is to partially fund part the transmission line.

  4. Final Conservation Billing Credit Policy Supplement Background and Need: This Conservation Billing Credit Policy Supplement describes how Bonneville

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.New Mexico Feb.Information 9 Default CaptionJointSecurityo n

  5. Independent Verification Survey Report for the Offsite Portion of the Potential Release Site-7 Abandoned Sanitary Line, Miamisburg Closure Project, Miamisburg, Ohio

    SciTech Connect (OSTI)

    P.C. Weaver

    2008-08-15T23:59:59.000Z

    The ORISE objective was to confirm that the remedial action process implemented by the contractor was in accordance with the PRS-7 Work Package. Following removal of the sanitary line, the soil beneath the line would be sampled to determine if remediation was required (ARC 2007a).

  6. Supply curve impacts of Quick Start projects in Phase 1 of the Resource Supply Expansion Program

    SciTech Connect (OSTI)

    Wright, G.A.; Warwick, W.M.; Durfee, D.L.

    1993-12-01T23:59:59.000Z

    The Pacific Northwest Laboratory (PNL) prepared this report under contract to the Bonneville Power Administration (Bonneville), as part of the Resource Supply Expansion Project (RSEP). RSEP is a regional program instituted by Bonneville to expand conservation and renewable generation options available to resource planners and utilities. Resource alternatives are increased by RSEP through demonstration projects designed in a collaborative process that targets specific barriers to resource development including institutional, market, and reliability barriers. RSEP was launched with several projects that were designed and implemented quickly in 1992 to lay a foundation for future collaboration. The purpose of this report is to introduce the goal and structure of RSEP and to describe the so-called ``Quick Start`` RSEP projects in Phase One of RSEP. This description includes a preliminary estimate of the energy savings and/or other expected impacts of RSEP projects funded in FY 1992 and 1993. Similar estimates are also included for Bonneville projects to confirm wind and geothermal generation potential. Bonneville`s Geothermal Confirmation Agenda preceded implementation of RSEP, although it has a similar objective and collaborative approach.

  7. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1993-07-01T23:59:59.000Z

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  8. EIS-0048-S: Bonneville Power Administration Proposed FY 1976 Program Facility Location, Okanogan Area Service, Douglas and Okanogan Counties, WA, Supplemental

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this facility location supplemental statement to address a proposal for transmission facilities to serve the Okanogan Valley, Washington. This statement is a supplement to Department of the Interior FES 75-79.

  9. FINAL PROJECT REPORT LOAD MODELING TRANSMISSION RESEARCH

    E-Print Network [OSTI]

    Lesieutre, Bernard

    2013-01-01T23:59:59.000Z

    Edison and  Bonneville Power Administration.   SCE acquired Steve Yang of the Bonneville Power Administration for their conducted by Bonneville Power Administration.   These 

  10. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    capital asset line item projects (less than 50 million) are fully funded in one Fiscal Year (one Appropriation). NA NA Policy memorandum drafted and in review 12. Cost...

  11. EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming.

  12. Operation of the 30 MJ superconducting magnetic energy storage system in the Bonneville Power Administration Electrical Grid

    SciTech Connect (OSTI)

    Rogers, J.D.; Boenig, H.J.; Schermer, R.I.; Hauer, J.F.

    1984-01-01T23:59:59.000Z

    The 30 MJ superconducting magnetic energy storage (SMES) system was installed in the Bonneville Power Administration (BPA) Tacoma Substation in 1982 to 1983. Operation of the unit since that time has been for over 1200 hours. Specific tests to explore the SMES system's thermal and electrical characteristics and the control functions were conducted. The coil heat load with current modulation was determined. A converter with two 6-pulse bridges interfaces the superconducting coil to the power bus. Equal bridge voltage amplitude and constant reactive power modes of operation of the system were run with computer control of the SCR bridge firing angles. Coil energy dump tests were performed. Electrical grid system response to SMES modulation was observed, and full power SMES modulation was undertaken.

  13. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Business Transformation Process Results BPA's Energy Efficiency organization recently completed a comprehensive organizational review to examine the scope of its IT systems,...

  14. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ways to find and document higher savings. Join the meeting: https:www.livemeeting.comccbpajoin?id 4J547B& roleattend&pwdR%3A*%23%21bj9 Add to my Outlook Calendar: https:...

  15. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management BC Hydro and Power Authority 691 1 Southpoint Drive, El5 Burnaby, B.C., Canada V3N 4 x 8 Dear Ms. Kurschner: This letter Agreement (09NTSSA) between our...

  16. Northwest, the Bonneville Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and vegetation or other objects connected to the ground that are up to 15 feet away. Preventive maintenance: A new national requirement After the big blackout in the Northeast...

  17. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vintage Rate (as made available by BPA) o All Non-Federal Resources (elect to not purchase power at Tier 2 rates) o Combination of BPA Tier 2 and Non-Federal Resources *...

  18. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    participating Customers to implement cost-effective conservation measures on eligible irrigation systems in their service territories. The Customer may use its Energy...

  19. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ESI Utility - ESIP Contact Matrix Last updated: December 12, 2014 For more information, please contact the appropriate ESIP. Utility Opt-In Date ESIP ESIP Location ESIP Phone ESIP...

  20. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    End of Rate Period Deadlines As the 2014-2015 rate period comes to a close, BPA would like to ensure our customers have the information necessary to plan for their close-out...

  1. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Performance Payment Calculator The performance payment calculator will be used only Instructions when a utility wants to request less than the maximum total performance payment...

  2. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Simple Steps Non-participating Utility Savings Allocation Changes SUMMARY: In June 2015, the Simple Steps program policy for non-participating utility savings will be updated....

  3. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Progress Payment Calculator The Progress Payment Calculator allows utilities to submit detailed information for the qualifying pre-approved progress payments. In order to qualify...

  4. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation Resource Management, BC Hydro and Power Authority 6911 Southpoint Drive, Tower 15 Burnaby, BC V3N 4X8 Dear Ms. Kurshner: This letter agreement (Agreement) between...

  5. Bonneville Power Administration

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny: The FutureCommentsEnergyandapproximately 10|BlueFireBoilerBoltonHooper Springs

  6. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AirGenerate and Electrolux Tier 2 Heat Pump Water Heaters Re-listed Why were these HPWH units removed from the HPWH Qualified Product List? Between March and August of 2013 Air...

  7. Bonneville Power Administrator Compares

    E-Print Network [OSTI]

    Nebraska-Lincoln, University of

    Larsen One of the highlights of the Pacific Northwest Water Resources and Irrigation Tour Sept. 8 it was when Lewis and Clark traveled it and camped near its mouth at Ft. Clattsop in the winter of 1805

  8. Northwest, the Bonneville Power

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for Renewable Energy:Nanowire Solar541,9337,2AprilBigtoDepartment of »Writers: Sue6 and

  9. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any

  10. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any Brownbag: What's

  11. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any Brownbag: What'sBPA

  12. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any Brownbag:

  13. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any Brownbag:3 Date:

  14. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any Brownbag:3 Date:2

  15. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any Brownbag:3 Date:2Low

  16. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any Brownbag:3

  17. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any Brownbag:3

  18. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any Brownbag:38/31/2012

  19. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We Any

  20. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We AnyProgress Payment

  1. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We AnyProgress Payment

  2. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We AnyProgress

  3. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We AnyProgressInterim

  4. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are We

  5. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview: Progress

  6. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview: ProgressMay 8,

  7. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview: ProgressMay

  8. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview: ProgressMay

  9. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:

  10. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I N I S

  11. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I N I S

  12. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I N I

  13. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I N

  14. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I NESI

  15. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I

  16. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I

  17. BONNEVILLE POWER ADMINISTRATION

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I

  18. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator| PrincetonBonissone Honored

  19. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator| PrincetonBonissone

  20. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator| PrincetonBonissoneDecember 20.

  1. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator| PrincetonBonissoneDecember

  2. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator| PrincetonBonissoneDecemberENT

  3. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator| PrincetonBonissoneDecemberENT^

  4. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator| PrincetonBonissoneDecemberENT^

  5. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator|

  6. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator|December 5, 2011 In reply refer

  7. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator|December 5, 2011 In reply

  8. Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041clothAdvanced Materials Advanced Materials Find FindRewind Generator|December 5, 2011 In

  9. LINE Commission Visits Idaho National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn12electron 9 5 - -/e),,s - 1 2 3 4 5 6 7 84, LINE Commission

  10. Route-Specific Passage and Survival of Steelhead Kelts at The Dalles and Bonneville Dams, 2012 - Final Report

    SciTech Connect (OSTI)

    Rayamajhi, Bishes; Ploskey, Gene R.; Woodley, Christa M.; Weiland, Mark A.; Faber, Derek M.; Kim, Jin A.; Colotelo, Alison HA; Deng, Zhiqun; Fu, Tao

    2013-07-31T23:59:59.000Z

    This study was mainly focused on evaluating the route-specific passage and migration success of steelhead kelts passing downstream through The Dalles Dam (TDA) and Bonneville Dam (BON) at Columbia River (CR) river kilometers 309 and 234 respectively. Oregon Department of Fish and Wildlife (ODFW) personnel collected, tagged and released out-migrating steelhead kelts in the tributaries of the Deschutes River, 15 Mile Creek and Hood River between April 14 and June 4, 2012. A PIT tag was injected into each kelt’s dorsal sinus whereas a Juvenile Salmon Acoustic Telemetry System (JSATS) acoustic micro-transmitter was attached to an external FLoy T-bar tag and inserted into the dorsal back musculature using a Floy tagging gun. JSATS cabled arrays were deployed at TDA and BON and autonomous node arrays were deployed near Celilo, Oregon (CR325); the BON forebay (CR236); the BON tailrace (CR233); near Knapp, Washington (CR156); and near Kalama, Washington (CR113) to monitor the kelts movement while passing through the dams and above mentioned river cross-sections.

  11. Debt collection project report

    SciTech Connect (OSTI)

    Not Available

    1980-05-01T23:59:59.000Z

    In October 1979 the Office of Management and Budget initiated a review of debt collection within the Federal Government. A DOE Debt Collection Project Team was established, and seven activites were selected for review. These were Albuquerque Operations Office; Bonneville Power Administration; Chicago Operations and Regional Office; Naval Petroleum Reserves, California; Oak Ridge Operations Office; Washington Financial Services Division; and Western Area Power Administration. The team visited each of these activities to collect data on the size, age, and types of receivables managed and procedures for billing, aging, and handling overdue accounts. Various deficiencies were found to exist at several of the DOE entities that are not consistent with good management practices in the performance of their debt collection functions. Also, the Debt Collection Project Team identified a wide variation in the procedures followed by DOE activities in the management of accounts receivable, and a wide variation in the effectiveness of the debt management functions. 1 figure, 17 tables. (RWR)

  12. EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess potential environmental impacts of the proposed rebuild of its 26-mile 115 kilovolt (kV) wood-pole Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon.

  13. EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington.

  14. EIS-0030-S: Bonneville Power Administration Proposed FY 1980 Program, Facility Location Supplement, Northwest Montana/North Idaho Support and Libby Integration, Supplemental

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration developed this supplemental statement to evaluate the environmental impacts of proposed alternative actions to alternative actions intended to address the need for reliability of electrical service to loads in Northwest Montana and North Idaho and the need for integrating the generation being added at Libby Dam into the Federal Columbia River Power System.

  15. EIS-0066: The Role of Bonneville Power Administration in the Pacific Northwest Power Supply System- including its Participation in a Hydro-Thermal Power Program

    Broader source: Energy.gov [DOE]

    The Bonneville Power Administration (BPA) prepared this EIS to examine the environmental impacts of the Pacific Northwest Power Planning and Conservation Act, which will foster regional electric power planning in the four Northwest states, as well as increase BPA’s authority to address future power needs.

  16. Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) – Lining Main Canal – Preliminary

    E-Print Network [OSTI]

    Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

    is the only source of water for the City of Eagle Pass and the towns of Quemado and El Indio. Recent agricultural water use during calendar years 1994-1998 for the District has ranged from 42,677 ac-ft to 105,893 ac-ft, with the five-year average at 71,657 ac... savings forthcoming from the total project are estimated, using amortization procedures, to be 8,084 ac-ft of water per year and 2,041,095,338 BTUs (598,211 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated...

  17. Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992

    SciTech Connect (OSTI)

    NONE

    1993-07-01T23:59:59.000Z

    This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan.

  18. Next Generation On-Line Dynamic Security Assessment

    E-Print Network [OSTI]

    Next Generation On-Line Dynamic Security Assessment Parts III and IV Final Project Report Power;Next Generation On-Line Dynamic Security Assessment Parts III and IV Final Project Report Parts III Research Center (PSERC) research project titled "Next Generation On-Line Dynamic Security Assessment

  19. Northwest Open Automated Demand Response Technology Demonstration Project

    E-Print Network [OSTI]

    Kiliccote, Sila

    2010-01-01T23:59:59.000Z

    was funded by Bonneville Power Administration and SeattlePam Sporborg (Bonneville Power Administration) David Hsu andfor the Bonneville Power Administration (BPA) in Seattle

  20. Northwest Open Automated Demand Response Technology Demonstration Project

    E-Print Network [OSTI]

    Kiliccote, Sila

    2010-01-01T23:59:59.000Z

    Funded by: Bonneville Power Administration Contact: Joshuawas funded by Bonneville Power Administration and SeattlePam Sporborg (Bonneville Power Administration) David Hsu and

  1. Use of Optical and Imaging Techniques for Inspection of Off-Line Joule-Heated Melter at the West Valley Demonstration Project

    SciTech Connect (OSTI)

    Plodinec, M. J.; Jang, P-R; Long, Z.; Monts, D. L.; Philip, T.; Su, Y.

    2003-02-25T23:59:59.000Z

    The West Valley melter has been taken out of service. Its design is the direct ancestor of the current melter design for the Hanford Waste Treatment Plant. Over its eight years of service, the West Valley melter has endured many of the same challenges that the Hanford melter will encounter with feeds that are similar to many of the Hanford double shell tank wastes. Thus, inspection of the West Valley melter prior to its disposal could provide valuable--even crucial--information to the designers of the melters to be used at the Hanford Site, particularly if quantitative information can be obtained. The objective of Mississippi State University's Diagnostic Instrumentation and Analysis Laboratory's (DIAL) efforts is to develop, fabricate, and deploy inspection tools for the West Valley melter that will (i) be remotely operable in the West Valley process cell; (ii) provide quantitative information on melter refractory wear and deposits on the refractory; and (iii) indicate areas of heterogeneity (e.g., deposits) requiring more detailed characterization. A collaborative arrangement has been established with the West Valley Demonstration Project (WVDP) to inspect their melter.

  2. EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA

    Broader source: Energy.gov [DOE]

    This EA evaluates the environmental impacts of a proposal by DOE’s Bonneville Power Administration to rebuild its existing Midway-Benton No.1 transmission line in place, or to reroute a portion of the Midway-Benton No. 1 transmission line that currently crosses Gable Mountain and Gable Butte in order to avoid crossing these features.

  3. RM Power Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    rate-setting functions were integrated in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line....

  4. Navajo Electrification Demonstraiton Project

    SciTech Connect (OSTI)

    Larry Ahasteen, Project Manager

    2006-07-17T23:59:59.000Z

    This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

  5. Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Weiland, Mark A.

    2001-01-30T23:59:59.000Z

    This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories.

  6. Proposed Project: Plains & Eastern Clean Line Transmission Line...

    Broader source: Energy.gov (indexed) [DOE]

    approximately 3,500 MW primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-service entities in the Mid-South and Southeast via an...

  7. Proposed Project: Plains & Eastern Clean Line Transmission Line |

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - TProcuring SolarNo. 195 - Oct. 7, 2011 |

  8. Proposed Project: Plains & Eastern Clean Line Transmission Line |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of ContaminationHubs+ ReportEnergy NationalDepartment of EnergyNo.

  9. Self-Correcting HVAC Controls Project Final Report

    SciTech Connect (OSTI)

    Fernandez, Nicholas; Brambley, Michael R.; Katipamula, Srinivas; Cho, Heejin; Goddard, James K.; Dinh, Liem H.

    2010-01-04T23:59:59.000Z

    This document represents the final project report for the Self-Correcting Heating, Ventilating and Air-Conditioning (HVAC) Controls Project jointly funded by Bonneville Power Administration (BPA) and the U.S. Department of Energy (DOE) Building Technologies Program (BTP). The project, initiated in October 2008, focused on exploratory initial development of self-correcting controls for selected HVAC components in air handlers. This report, along with the companion report documenting the algorithms developed, Self-Correcting HVAC Controls: Algorithms for Sensors and Dampers in Air-Handling Units (Fernandez et al. 2009), document the work performed and results of this project.

  10. Overview of the Performance of PIT-Tag Interrogation Systems for Adult Salmonids at Bonneville and McNary Dams, 2002.

    SciTech Connect (OSTI)

    Downing, Sandra L.; Prentice, Earl F.

    2003-06-01T23:59:59.000Z

    During winter 2001, the U.S. Army Corps of Engineers (Corps) and Bonneville Power Administration (BPA) installed a prototype orifice-based PIT-tag interrogation system into the Washington Shore Ladder at Bonneville Dam (BWSL). Detectors were installed into 12 weirs: 4 downstream (Weirs 334-337) and 8 upstream (Weirs 352-359) from the fish release point (i.e., the exit ladder for the Adult Fish Facility). NOAA Fisheries (National Marine Fisheries Service--NMFS) tagged and released salmonids during 2001 to determine tag-reading efficiencies for different salmonid populations. Data analyses focused on the upper eight weirs. The 2001 tagging results for spring chinook salmon indicated that having detectors in four consecutive weirs would have been sufficient to yield a reading efficiency of 95%. The BWSL orifice-based system performed well until the coho and fall chinook salmon migrations began. Coho and fall chinook salmon appeared to use the weir overflows, and thus avoid detection, at much higher rates than biologists expected. During 2001, technology advances led to the development of significantly larger antennas than had been available earlier, and thus it was possible to build antennas of approximately 2 x 6 ft. Consequently, it became feasible to design interrogation systems for ladder locations where all fish would have to go through the antennas and thus could not avoid detection by using the weir overflows (Fig. 1). Destron Technologies by Digital Angel designed a prototype interrogation system with two antennas that was installed into the counting-window area in the Oregon Ladder at McNary Dam, where its performance could then be directly compared to that of the orifice-based system in the same ladder. Although the orifice-based systems appeared less effective than the fisheries community wanted for fall chinook and coho salmon, the decision was made to proceed with installations planned for Bonneville and McNary Dams because valuable data would still be collected. During the winter of 2002, the Corps and BPA installed PIT-tag interrogation systems into the Bradford Island and Cascades Island Fish Ladders at Bonneville Dam and into the Washington and Oregon Ladders at McNary Dam. Like BWSL in 2001, these ladders had eight weirs (16 orifices) outfitted with fiberglass antennas. Douglas County Public Utility District also installed an orifice-based system into its ladders at Wells Dam, but they were able to use weirs with no overflow sections wherein all fish had to swim through the orifice antennas. Thus, 2002 was the first year that the fisheries community had PIT-tag detection of adult salmonids at Bonneville, McNary, Wells, and Lower Granite Dams (Fig. 2). This overview will provide information on how well the systems at Bonneville and McNary Dams performed.

  11. Williston to Stateline Transmission Line Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental assessment (EA) on the proposed Williston to...

  12. Line Rebuild, Relocation and Substation Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)Integrated Codes |Is Your HomeLatestCenter (LMI-EFRC) -Choices toLee

  13. EIS-0296: South Oregon Coast Reinforcement Project, Coos Bay/North Bend, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration proposes to build a 500- kilovolt (kV) transmission line and new substation to reinforce electrical service to the southern coast of the state of Oregon. Nucor Steel, a division of Nucor Corporation, may build a new steel mill in the Coos Bay/North Bend, Oregon, area.

  14. EIS-0436: I-5 Corridor Reinforcement Project; Multnomah County, Oregon, and Cowlitz and Clark Counties, Washington

    Broader source: Energy.gov [DOE]

    DOE’s Bonneville Power Administration (BPA) is preparing an EIS that will evaluate the potential environmental impacts of a BPA proposal to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Washington, to a new 500-kV substation near Troutdale, Oregon.

  15. EIS-0267: BPA/Lower Valley Transmission System Reinforcement Project, Wyoming

    Broader source: Energy.gov [DOE]

    This EIS analyzes BPA and LVPL proposal to construct a new 115-kV line from BPA’s Swan Valley Substation near Swan Valley in Bonneville County, Idaho about 58 km (36 miles) east to BPA’s Teton Substation near Jackson in Teton County, Wyoming.

  16. Completed Projects Table 2015-02-09.xlsx

    Office of Environmental Management (EM)

    Yes Construction Line Item Project Depleted Uranium Hexafluoride Conversion Project (DUF6) Portsmouth & Paducah 02-U-101 346 580 2008 2010 No No Yes Nuclear Facility...

  17. EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA

    Broader source: Energy.gov [DOE]

    Draft Environmental Assessment DOE will prepare an EA to evaluate the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington.

  18. Productivity Improvement of a Manual Assembly Line

    E-Print Network [OSTI]

    Yerasi, Pranavi

    2012-10-19T23:59:59.000Z

    The current project addresses the productivity improvement of a manual assembly line by making use of operations analysis in the framework of Lean production. A methodology is proposed that helps to improve the productivity of any production process...

  19. EIS-0378: Port Angeles-Juan de Fuca Transmission Project, WA

    Broader source: Energy.gov [DOE]

    This EIS assesses DOE decision to approve the Sea Breeze Transmission project for a Presidential permit for through DOE's Office of Electricity Delivery and Energy Reliability and for approval for interconnection into the federal transmission system through the Bonneville Power Administration (BPA).

  20. EA-1974: Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon

    Broader source: Energy.gov [DOE]

    Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed restoration of a tidal marsh in the Columbia River Estuary, near Astoria in Clatsop County, Oregon. The project website is https://www.bpa.gov/goto/WallooskeeYoungs.

  1. EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

  2. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01T23:59:59.000Z

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  3. Designation of Environmental Management Federal Project Director for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration wouldDECOMPOSITIONPortalToDepthand Immobilization Plant Project,

  4. results and benefits... The Bittern Line Carbon

    E-Print Network [OSTI]

    Everest, Graham R

    results and benefits... The Bittern Line Carbon Neutral Stations Transport Regeneration Ltd. June 2008 c a s e s t u d yCRed carbon reduction Project Summary Our client, Transport Regeneration Ltd., aims to make nine stations on the Bittern Line between Norwich and Sheringham carbon neutral

  5. The Linux Command Line Second Internet Edition

    E-Print Network [OSTI]

    Dahl, David B.

    The Linux Command Line Second Internet Edition William E. Shotts, Jr. A LinuxCommand.org Book #12....................................................................................................xvi Why Use The Command Line to their respective owners. This book is part of the LinuxCommand.org project, a site for Linux education and advo

  6. Project Year Project Title

    E-Print Network [OSTI]

    Gray, Jeffrey J.

    Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

  7. Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007

    SciTech Connect (OSTI)

    Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

    2008-03-12T23:59:59.000Z

    The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

  8. Research Projects in Industrial Technology.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Industrial Technology Section.

    1990-06-01T23:59:59.000Z

    The purpose of this booklet is to briefly describe ongoing and completed projects being carried out by Bonneville Power Administration's (BPA) Industrial Technology Section. In the Pacific Northwest, the industrial sector is the largest of the four consuming sectors. It accounted for thirty-nine percent of the total firm demand in the region in 1987. It is not easy to asses the conservation potential in the industrial sector. Recognizing this, the Northwest Power Planning Council established an objective to gain information on the size, cost, and availability of the conservation resource in the industrial sector, as well as other sectors, in its 1986 Power Plan. Specifically, the Council recommended that BPA operate a research and development program in conjunction with industry to determine the potential costs and savings from efficiency improvements in industrial processes which apply to a wide array of industrial firms.'' The section, composed of multidisciplinary engineers, provides technical support to the Industrial Programs Branch by designing and carrying out research relating to energy conservation in the industrial sector. The projects contained in this booklet are arranged by sector --industrial, utility, and agricultural -- and, within each sector, chronologically from ongoing to completed, with those projects completed most recently falling first. For each project the following information is given: its objective approach, key findings, cost, and contact person. Completed projects also include the date of completion, a report title, and report number.

  9. Manhattan Project Sites at Los Alamos

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville PowerCherries 82981-1cnHigh SchoolIn12electron 9Novemberutilities and aHistoric Manhattan Project

  10. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on SiteProject Fact Sheet Project Update: Project Brief: The concept of the new scheme is to redevelop Gardens project http://www.imperial.ac.uk/princesgardens/ Construction Project Team: Project Facts

  11. Exploration and project management Sylvain Lenfle

    E-Print Network [OSTI]

    Paris-Sud XI, Université de

    to manage innovation. We argue that, in line with the work on project classification, a distinction should1 Exploration and project management Sylvain Lenfle University of Cergy-Pontoise Management of Project Management, Vol. 6, n°5, p. 469-478, July. Abstract Project management in academic studies tends

  12. Northeast Oregon Hatchery Project, Final Siting Report.

    SciTech Connect (OSTI)

    Watson, Montgomery

    1995-03-01T23:59:59.000Z

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and direct release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.

  13. Project Funding

    Broader source: Energy.gov [DOE]

    Federal energy projects require funding to generate results. Carefully matching available funding options with specific project needs can make the difference between a stalled, unfunded project and a successful project generating energy and cost savings.

  14. NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT

    SciTech Connect (OSTI)

    Terry W. Battiest

    2008-06-11T23:59:59.000Z

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

  15. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration would likeConstitution4 DepartmentInnovation Portal Biomass and

  16. Custom Projects

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration would likeConstitution4 DepartmentInnovation Portal Biomass

  17. Reading File Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    reply refer to: PG-5 Ms. Renata Kurschner Director, Generation Resource Management B.C. Hydro and Power Authority 691 1 Southpoint Drive, 1 5th Floor Burnaby, B.C. V3N 4 x 8 Dear...

  18. About Us - Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOnItem NotEnergy,ARMForms About Become agovEducationWelcome toAboutAbout GEEducation

  19. Reading File Bonneville Power Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's PossibleRadiation Protection Radiation ProtectionRaising funds forAdvancedAdvancedReading File

  20. Bonneville Power Administration Disclaimer Statement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625govInstrumentstdmadapInactiveVisiting the TWPSuccess Stories Site MapSolar energy(cousin -in-lawHome Page

  1. Transmission Line Security Monitor: Final Report

    SciTech Connect (OSTI)

    John Svoboda

    2011-04-01T23:59:59.000Z

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  2. EIS-0506: Crooked River Valley Rehabilitation Project, Idaho County, Idaho

    Broader source: Energy.gov [DOE]

    The U.S. Forest Service, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, is preparing an EIS that evaluates the potential environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring instream fish habitat complexity, and improving water quality along approximately 2 miles of the Crooked River. BPA’s proposed action is to fund the project. Additional information is available at http://www.fs.fed.us/nepa/fs-usda-pop.php/?project=40648.

  3. Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011

    SciTech Connect (OSTI)

    Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

    2012-06-04T23:59:59.000Z

    This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

  4. Nez Perce Tribal Hatchery Project; Operations and Maintenance and Planning and Design, 2002 Annual Report.

    SciTech Connect (OSTI)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2005-12-01T23:59:59.000Z

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2002 annual report combines information from two contracts with a combined value of $3,036,014. Bonneville Power Administration identifies them as follows; (1) Part I--Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and $2,682,635 which includes--Equipment costs of $1,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration Master Plan development Based on NPPC authorization for construction and operation of NPTH, the annual contracts were negotiated for the amounts shown above under (1) and (2). Construction contracts were handled by BPA until all facilities are completed and accepted.

  5. U.S. Department of Energy Project Review Guide for Capital Asset Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-09-23T23:59:59.000Z

    This Guide addresses the various project reviews conducted during the life-cycle of a project based on the stage, complexity and duration of a project. This Guide describes typical reviews, the purpose of each, the timing during the project life-cycle, lines of inquiry, and required documentation. No cancellations.

  6. Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY 291 Project Information Date: 31 12010 Contractor Code: Project Overview In order to...

  7. Assessment of Smolt Condition for Travel Time Analysis Project, 1987-1997 Project Review.

    SciTech Connect (OSTI)

    Schrock, Robin M.; Hans, Karen M.; Beeman, John W. [US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA

    1997-12-01T23:59:59.000Z

    The assessment of Smolt Condition for Travel Time Analysis Project (Bonneville Power Administration Project 87-401) monitored attributes of salmonid smolt physiology in the Columbia and Snake River basins from 1987 to 1997, under the Northwest Power Planning Council Fish and Wildlife Program, in cooperation with the Smolt Monitoring Program of the Fish Passage Center. The primary goal of the project was to investigate the physiological development of juvenile salmonids related to migration rates. The assumption was made that the level of smolt development, interacting with environmental factos such as flow, would be reflected in travel times. The Fish Passage Center applied the physiological measurements of smolt condition to Water Budget management, to regulate flows so as to decrease travel time and increase survival.

  8. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Environmental Management (EM)

    from Block Plains and Eastern Clean Line: Arkansas and Oklahoma Plains and Eastern Clean Line Transmission Line: Comment from Block Plains and Eastern Clean Line: Arkansas and...

  9. Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-5) - Big Eddy-Ostrander Transmission Line

    SciTech Connect (OSTI)

    N /A

    2001-03-30T23:59:59.000Z

    BPA proposes to clear unwanted vegetation from the rights of way and access roads for BPA's Big Eddy-Ostrander Transmission Line, beginning April and ending in May, 2001. A Checklist was completed for this project in accordance to the requirements identified in the Bonneville Power Administrations Transmission System Vegetation Management Program FEIS (DOE/EIS-0285). The Checklist evaluated the following areas: (1) Description of right-of-way and vegetation management needed; (2) Vegetation to be controlled; (3) Surrounding land use and landowner; (4) Natural Resource; (5) Vegetation control methods; (6) Debris disposal; (7) Monitoring; and (8) Appropriate environmental documentation. In preparation of this Supplement Analysis, the Checklist was reviewed. Specific information regarding the areas as identified above are described the attached checklist. This Supplement Analysis finds that: (1) the proposed actions are substantially consistent with the Transmission System Vegetation Management Program FEIS (DOE/EIS0285) and ROD; and (2) there are no new circumstances or information relevant to environmental concerns and bearing on the proposed actions or their impacts. Therefore, no further NEPA documentation is required.

  10. EIS-0207: Newberry Geothermal Pilot Project

    Broader source: Energy.gov [DOE]

    The U.S. Forest Service prepared this statement to analyze three alternatives and associated environmental impacts for it to enable the CEE Exploration Company of Portland, Oregon to build and operate a geothermal pilot project and supporting facilities capable of generating 33 megawatts of electric power in the Deschutes National Forest in central Oregon. The Department of Energy’s Bonneville Power Administration (BPA) served as a cooperating agency in preparing this statement in order to fulfill its National Environmental Policy Act obligations ahead of its statutory obligations to purchase and transmit power to customers in the Pacific Northwest, if it is decided that the project will proceed. BPA adopted this statement by October 1994.

  11. Project Controls

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  12. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1995-08-01T23:59:59.000Z

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  13. Boron-10 Lined Proportional Counter Wall Effects

    SciTech Connect (OSTI)

    Siciliano, Edward R.; Kouzes, Richard T.

    2012-05-01T23:59:59.000Z

    The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project 'Coincidence Counting With Boron-Based Alternative Neutron Detection Technology' at Pacific Northwest National Laboratory (PNNL) for development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube based system in the configuration of a coincidence counter. This report provides information about how variations in proportional counter radius and gas pressure in a typical coincident counter design might affect the observed signal from boron-lined tubes. A discussion comparing tubes to parallel plate counters is also included.

  14. EC Transmission Line Risk Identification and Analysis

    SciTech Connect (OSTI)

    Bigelow, Tim S [ORNL

    2012-04-01T23:59:59.000Z

    The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

  15. EIS-0091: Garrison-Spokane 500-kV Transmission Project

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Bonneville Power Administration (BPA) developed this statement to evaluate the environmental impacts of constructing between 254 and 271 miles of 500-kilovolt transmission line across western Montana and northern Idaho to the Spokane area in order to reinforce a section of the BPA electric power grid and to permit reliable integration of 1,240 megawatts of power produced by Colstrip Units 3 and 4, for use in Montana and throughout the Northwest.

  16. Project Fact Sheet Project Update

    E-Print Network [OSTI]

    Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

  17. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    .union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital PlanProject Fact Sheet Project Brief: In the first phase of the Union Building re that it adapts to meet the needs of a changing student body. The re-development plans are grounded in a full

  18. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: StartProject Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors of work includes: · Building fabric replacement and revised space planning · New mechanical and electrical

  19. EC Transmission Line Materials

    SciTech Connect (OSTI)

    Bigelow, Tim S [ORNL

    2012-05-01T23:59:59.000Z

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  20. EIS-0116-S1: Final Supplemental Environmental Impact Statement for the Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project, Grand and Summit Counties, Colorado

    Broader source: Energy.gov [DOE]

    This supplemental environmental impact statement by the Western Area Power Administration assesses the environmental effects of constructing, operating, and maintaining about 30 miles of 230/345-kV transmission line between the existing Gore Pass Substation northwest of Kremmling, Colorado, and a proposed new substation (not part of this action) near the Ute Pass Road. Alternatives assessed included routing and design alternatives plus the alternatives addressed in the Hayden-Blue River Final EIS, issued by the Rural Electrification Administration in July 1982 and adopted by DOE in June 1985 (see DOE/EIS-0116).

  1. LS Power Associates (ON Line - formerly known as SWIP-S) | Department...

    Office of Environmental Management (EM)

    (ON Line) project, a 235-mile, 500 kV AC transmission line capable of carrying 600 MW of power to the grid, running north-south between Ely, NV and just north of Las Vegas. The...

  2. Field Study and Numerical Simulation of Sub Slab Ventilation Systems

    E-Print Network [OSTI]

    Bonnefous, Y.C.

    2008-01-01T23:59:59.000Z

    1: project report. Bonneville Power Administration Report;Laboratory by Bonneville Power Administration (BPA) through

  3. ROTATING LINE CAMERAS: EPIPOLAR GEOMETRY AND SPATIAL SAMPLING

    E-Print Network [OSTI]

    project 3D scenes on a cylindric sur- face, where one or multiple rotating sensor lines allow to compose for controlling this error, allowing to adjust the camera position- ing at the time of photo shooting. The report

  4. Energy Department Announces New Innovative Projects to Develop Advanced

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField Campaign:INEAWaterCool Roofs EnergyVehicleProject |Investments toDrop-in

  5. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.New Mexico Feb. 13, 2013 NAME:JobTimothyOPMO Projects Office

  6. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.New Mexico Feb. 13, 2013 NAME:JobTimothyOPMO Projects

  7. Fermilab | Directorate | Office of Project Management Oversight (OPMO) |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power AdministrationField8,Dist.New Mexico Feb. 13, 2013 NAME:JobTimothyOPMO ProjectsPolicies

  8. SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet. SunLine Test Drives Hydrogen Bus: Hydrogen Fuel...

  9. SunLine Expands Horizons with Fuel Cell Bus Demo. Hydrogen, Fuel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expands Horizons with Fuel Cell Bus Demo. Hydrogen, Fuel Cells & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects (Fact Sheet). SunLine Expands Horizons...

  10. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  11. On-Line Transient Stability Assessment Scoping Study

    E-Print Network [OSTI]

    On-Line Transient Stability Assessment Scoping Study Final Project Report Power Systems Engineering PSERC #12;Power Systems Engineering Research Center On-Line Transient Stability Assessment Scoping Study With the increase in transactions on the bulk power system, there is a critical need to determine transient security

  12. DOE-EPRI On-Line Monitoring Implementation Guidelines

    SciTech Connect (OSTI)

    E. Davis; R. Bickford

    2003-01-02T23:59:59.000Z

    OAK B139 Industry and EPRI experience at several plants has shown on-line monitoring to be very effective in identifying out-of-calibration instrument channels or indications of equipment-degradation problems. The EPRI implementation project for on-line monitoring has demonstrated the feasibility of on-line monitoring at several participating nuclear plants. The results have been very encouraging, and substantial progress is anticipated in the coming years.

  13. DOE-EPRI On-Line Monitoring Implementation Guidelines

    SciTech Connect (OSTI)

    E. Davis, R. Bickford

    2003-01-02T23:59:59.000Z

    Industry and EPRI experience at several plants has shown on-line monitoring to be very effective in identifying out-of-calibration instrument channels or indications of equipment-degradation problems. The EPRI implementation project for on-line monitoring has demonstrated the feasability of on-line monitoring at several participating nuclear plants. The results have been very enouraging, and substantial progress is anticipated in the coming years.

  14. Magnesium Projects

    Broader source: Energy.gov (indexed) [DOE]

    cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

  15. Project Construction

    Broader source: Energy.gov [DOE]

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  16. Instrument validation project

    SciTech Connect (OSTI)

    Reynolds, B.A.; Daymo, E.A.; Geeting, J.G.H.; Zhang, J.

    1996-06-01T23:59:59.000Z

    Westinghouse Hanford Company Project W-211 is responsible for providing the system capabilities to remove radioactive waste from ten double-shell tanks used to store radioactive wastes on the Hanford Site in Richland, Washington. The project is also responsible for measuring tank waste slurry properties prior to injection into pipeline systems, including the Replacement of Cross-Site Transfer System. This report summarizes studies of the appropriateness of the instrumentation specified for use in Project W-211. The instruments were evaluated in a test loop with simulated slurries that covered the range of properties specified in the functional design criteria. The results of the study indicate that the compact nature of the baseline Project W-211 loop does not result in reduced instrumental accuracy resulting from poor flow profile development. Of the baseline instrumentation, the Micromotion densimeter, the Moore Industries thermocouple, the Fischer and Porter magnetic flow meter, and the Red Valve Pressure transducer meet the desired instrumental accuracy. An alternate magnetic flow meter (Yokagawa) gave nearly identical results as the baseline fischer and Porter. The Micromotion flow meter did not meet the desired instrument accuracy but could potentially be calibrated so that it would meet the criteria. The Nametre on-line viscometer did not meet the desired instrumental accuracy and is not recommended as a quantitative instrument although it does provide qualitative information. The recommended minimum set of instrumentation necessary to ensure the slurry meets the Project W-058 acceptance criteria is the Micromotion mass flow meter and delta pressure cells.

  17. Series Transmission Line Transformer

    DOE Patents [OSTI]

    Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

    2004-06-29T23:59:59.000Z

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  18. Couse/Tenmile Creeks Watershed Project Implementation : 2007 Conservtion Projects. [2007 Habitat Projects Completed].

    SciTech Connect (OSTI)

    Asotin County Conservation District

    2008-12-10T23:59:59.000Z

    The Asotin County Conservation District (ACCD) is the primary entity coordinating habitat projects on private lands within Asotin County watersheds. The Tenmile Creek watershed is a 42 square mile tributary to the Snake River, located between Asotin Creek and the Grande Ronde River. Couse Creek watershed is a 24 square mile tributary to the Snake River, located between Tenmile Creek and the Grande Ronde River. Both watersheds are almost exclusively under private ownership. The Washington Department of Fish and Wildlife has documented wild steelhead and rainbow/redband trout spawning and rearing in Tenmile Creek and Couse Creek. The project also provides Best Management Practice (BMP) implementation throughout Asotin County, but the primary focus is for the Couse and Tenmile Creek watersheds. The ACCD has been working with landowners, Bonneville Power Administration (BPA), Washington State Conservation Commission (WCC), Natural Resource Conservation Service (NRCS), Farm Service Agency (FSA), Salmon Recovery Funding Board (SRFB), Washington Department of Fish and Wildlife (WDFW), U.S. Forest Service, Pomeroy Ranger District (USFS), Nez Perce Tribe (NPT), Washington Department of Ecology (DOE), National Marine Fisheries Service (NOAA Fisheries), and U.S. Fish and Wildlife Service (USFWS) to address habitat projects in Asotin County. The Asotin Subbasin Plan identified priority areas and actions for ESA listed streams within Asotin County. Couse Creek and Tenmile Creek are identified as protection areas in the plan. The Conservation Reserve Enhancement Program (CREP) has been successful in working with landowners to protect riparian areas throughout Asotin County. Funding from BPA and other agencies has also been instrumental in protecting streams throughout Asotin County by utilizing the ridge top to ridge top approach.

  19. Electric Transmission Lines (Nebraska)

    Broader source: Energy.gov [DOE]

    The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

  20. Howtorun Platon from the command line Xray Diffraction Laboratory, Department of Chemistry, Texas A & M University March 31, 2009

    E-Print Network [OSTI]

    Meagher, Mary

    Howtorun Platon from the command line Xray Diffraction Laboratory, Department of Chemistry). At the command line type platon ­switch project_name.(ins, .fcf,.spf,.cif) For example to run an interaction twinrotmat in platon from the command line employing the *.fcf file type platon ­L project_name.fcf See

  1. Concurrent Wind Cooling in Power Transmission Lines

    SciTech Connect (OSTI)

    Jake P Gentle

    2012-08-01T23:59:59.000Z

    Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

  2. Transmission Line Security Monitor

    ScienceCinema (OSTI)

    None

    2013-05-28T23:59:59.000Z

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  3. Transmission Line Security Monitor

    SciTech Connect (OSTI)

    None

    2011-01-01T23:59:59.000Z

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  4. FEDIX on-line information service: Design, develop, test, and implement, an on-line research and education information service

    SciTech Connect (OSTI)

    Rodman, J.A.

    1992-01-01T23:59:59.000Z

    The FEDIX Annual Status Report provides details regarding an on-line information project designed, developed and implemented by Federal Information Exchange, Inc., a diversified information services company. This document details the project design activities, summarizes the developmental phases of the project and describes the implementation activities generated to fulfill the project's objectives. The information contained in this document illustrates FIE's continuing commitment to serve as the link that facilitates the dissemination of federal information to the education community. This report reviews the project accomplishments and describes intended service enhancements.

  5. Supplement Analysis for the Watershed Management Program EIS - Idaho Model Watershed Habitat Projects - Welp Riparian Enhancement Fence

    SciTech Connect (OSTI)

    N /A

    2004-08-04T23:59:59.000Z

    The Bonneville Power Administration is proposing to fund the installation of approximately 1.5 miles of post and wire fence along Valley Creek in Stanley, Idaho. The proposed fence will meet or exceed BPA's minimum requirement of a 35-foot setback from the stream. Fence posts will be driven into the ground with a post ponder. The goal of this project is to enhance salmon and steelhead rearing and migration habitat through exclusion fencing.

  6. West Foster Creek Expansion Project 2007 HEP Report.

    SciTech Connect (OSTI)

    Ashley, Paul R.

    2008-02-01T23:59:59.000Z

    During April and May 2007, the Columbia Basin Fish and Wildlife Authority's (CBFWA) Regional HEP Team (RHT) conducted baseline Habitat Evaluation Procedures (HEP) (USFWS 1980, 1980a) analyses on five parcels collectively designated the West Foster Creek Expansion Project (3,756.48 acres). The purpose of the HEP analyses was to document extant habitat conditions and to determine how many baseline/protection habitat units (HUs) to credit Bonneville Power Administration (BPA) for funding maintenance and enhancement activities on project lands as partial mitigation for habitat losses associated with construction of Grand Coulee and Chief Joseph Dams. HEP evaluation models included mule deer (Odocoileus hemionus), western meadowlark (Sturnella neglecta), sharp-tailed grouse, (Tympanuchus phasianellus), Bobcat (Lynx rufus), mink (Neovison vison), mallard (Anas platyrhynchos), and black-capped chickadee (Parus atricapillus). Combined 2007 baseline HEP results show that 4,946.44 habitat units were generated on 3,756.48 acres (1.32 HUs per acre). HEP results/habitat conditions were generally similar for like cover types at all sites. Unlike crediting of habitat units (HUs) on other WDFW owned lands, Bonneville Power Administration received full credit for HUs generated on these sites.

  7. Effects of Domestication on Predation Mortality and Competitive Dominance; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2004-2005 Annual Report.

    SciTech Connect (OSTI)

    Pearsons, Todd N.; Fritts, Anthony L.; Scott, Jennifer L. (Washington Department of Fish and Wildlife, Olympia, WA)

    2005-05-01T23:59:59.000Z

    This report is intended to satisfy two concurrent needs: (1) provide a contract deliverable from the Washington Department of Fish and Wildlife (WDFW) to the Bonneville Power Administration (BPA), with emphasis on identification of salient results of value to ongoing Yakima/Klickitat Fisheries Project (YKFP) planning, and (2) summarize results of research that have broader scientific relevance. This is the second of a series of progress reports that address the effects of hatchery domestication on predation mortality and competitive dominance in the upper Yakima River basin (Pearsons et al. 2004). This progress report summarizes data collected between January 1, 2004 and December 31, 2004. Raising fish in hatcheries can cause unintended behavioral, physiological, or morphological changes in chinook salmon due to domestication selection. Domestication selection is defined by Busack and Currens 1995 as, ''changes in quantity, variety, or combination of alleles within a captive population or between a captive population and its source population in the wild as a result of selection in an artificial environment''. Selection in artificial environments could be due to intentional or artificial selection, biased sampling during some stage of culture, or unintentional selection (Busack and Currens 1995). Genetic changes can result in lowered survival in the natural environment (Reisenbichler and Rubin 1999). The goal of supplementation or conservation hatcheries is to produce fish that will integrate into natural populations. Conservation hatcheries attempt to minimize intentional or biased sampling so that the hatchery fish are similar to naturally produced fish. However, the selective pressures in hatcheries are dramatically different than in the wild, which can result in genetic differences between hatchery and wild fish. The selective pressures may be particularly prominent during the freshwater rearing stage where most mortality of wild fish occurs. The Yakima Fisheries Project is studying the effects of domestication on a variety of adult and juvenile traits of spring chinook salmon (Busack et al. 2003). The overall experimental design is to compare a variety of traits, across generations, from three lines of Yakima basin chinook, a hatchery control, supplementation line, and a wild control. The hatchery line was derived from wild upper Yakima broodstock and is only allowed to spawn in the hatchery. The supplementation line is upper Yakima stock that spawns in the upper Yakima River. This stock is an integration of wild and hatchery supplementation fish. Starting in 2005, we plan to use a wild control line of fish that will be the offspring of wild broodstock collected in the Naches River system, a tributary to the Yakima River. The Naches River is not stocked with hatchery fish, and there is minimal stray from Upper Yakima supplementation, so we believe that these will serve as a control to compare any genotypic changes in the hatchery and the supplementation line. As generations of fish are tested, we believe we will be able to analyze the data using an analysis of covariance to test the hypothesis that the hatchery line will exhibit greater domestication over generations, the wild line will remain at baseline levels, and the supplementation line will be somewhere in between. In this report, we have used the terms ''hatchery'' or ''supplementation'' to refer to upper Yakima fish that are progeny of fish that spent one generation in the hatchery, and ''wild'' to refer to fish that have had no exposure to the hatchery other than the matings for this experiment. The terms are relative to the parents that produced the fish for these experiments. All progeny of these fish were mated and reared under the same laboratory conditions. This report addresses two juvenile traits: predation mortality, and competitive dominance. Other traits will be presented in other project reports. It is anticipated that it will take at least two to five generations to detect measurable responses in many domestication response variables (Busack et

  8. Project Manager

    Broader source: Energy.gov [DOE]

    A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

  9. RENOTER Project

    Broader source: Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  10. Project: An International Network on Expectational coordination. 1. Introduction.

    E-Print Network [OSTI]

    Tesfatsion, Leigh

    . The driving intellectual direction of the project. a) A critical assessment of REH REH is a universal tool, broadly speaking, three lines of thinking. - The first line of critical assessment may be viewed a multiplicity dimension - see Chamley (2002)). 1 A move along the lines of P. Krugman's advice in his chronicles

  11. Intrinsic AGN Absorption Lines

    E-Print Network [OSTI]

    Fred Hamann

    2000-06-12T23:59:59.000Z

    Strong absorption lines are common in rest-frame UV spectra of AGNs due to a variety of resonant transitions, for example the HI Lyman series lines (most notably Ly-alpha 1216) and high-ionization doublets like CIV 1549,1551. The lines are called ``intrinsic'' if the absorbing gas is physically related to the AGN, e.g. if the absorber resides broadly within the radius of the AGN's surrounding ``host'' galaxy. Intrinsic absorption lines are thus valuable probes of the kinematics, physical conditions and elemental abundances in the gas near AGNs. Studies of intrinsic absorbers have historically emphasized the broad absorption lines (BALs) in quasars. Today we recognize a wider variety of intrinsic lines in a wider range of objects. For example, we now know that Seyfert 1 galaxies (the less luminous cousins of quasars) have intrinsic absorption. We also realize that intrinsic lines can form in a range of AGN environments --- from the dynamic inner regions like the BALs, to the more quiescent outer host galaxies >10 kpc away. This article provides a brief introduction to current observational and theoretical work on intrinsic AGN absorbers.

  12. The process of materials specifications for rubber lining

    SciTech Connect (OSTI)

    Earnest, R.A. [Polymeric Protective Linings, Livonia, MI (United States)

    1998-12-31T23:59:59.000Z

    Rubber is an engineered material with a long history of development, and application. The process of selecting the appropriate material for a given application is critical to the success of a lining project. A through knowledge of the process parameters for a rubber lined system will generate the information necessary to ensure maximum service life from the lining materials. Communication between the owner, applicator and manufacturer defines the process of material specification and selection. The goal of this process is to engineer the best fit for a rubber lining application.

  13. Coherent soliton communication lines

    SciTech Connect (OSTI)

    Yushko, O. V., E-mail: olesya.yushko@gmail.com; Redyuk, A. A.; Fedoruk, M. P.; Turitsyn, S. K. [Novosibirsk State University (Russian Federation)

    2014-11-15T23:59:59.000Z

    The data transmission in coherent fiber-optical communication lines using solitons with a variable phase is studied. It is shown that nonlinear coherent structures (solitons) can be applied for effective signal transmission over a long distance using amplitude and optical-phase keying of information. The optimum ratio of the pulse width to the bit slot at which the spectral efficiency (transmitted bits per second and hertz) is maximal is determined. It is shown that soliton fiber-optical communication lines can ensure data transmission at a higher spectral efficiency as compared to traditional communication lines and at a high signal-to-noise ratio.

  14. Dynamic Line Rating: Research and Policy Evaluation

    SciTech Connect (OSTI)

    Jake P. Gentle; Kurt S. Myers; Michael R. West

    2014-07-01T23:59:59.000Z

    Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of electrical conductors to be increased based on local weather conditions. Overhead lines are conventionally given a conservative rating based on worst case scenarios. We demonstrate that observing the conditions in real time leads to additional capacity and safer operation. This paper provides a report of a pioneering scheme in the United States of America in which DLR has been applied. Thereby, we demonstrate that observing the local weather conditions in real time leads to additional capacity and safer operation. Secondly, we discuss limitations involved. In doing so, we arrive at novel insights which will inform and improve future DLR projects. Third, we provide a policy background and discussion to clarify the technology’s potential and identifies barriers to the imminent adoption of dynamic line rating systems. We provide suggestions for regulatory bodies about possible improvements in policy to encourage adoption of this beneficial technology.

  15. Holes in Spectral Lines

    E-Print Network [OSTI]

    Fontana, Peter R.; Srivastava, Rajendra P.

    1973-06-01T23:59:59.000Z

    The decay of an atom in the presence of a static perturbation is investigated. The perturbation couples a decaying state with a nondecaying state. A "hole" appears in the emission line at a frequency equal to the frequency difference between...

  16. Line Extension Alternatives

    Broader source: Energy.gov [DOE]

    The Public Service Board (PSB) of Vermont developed rules regarding utility line extension requests. While the majority of the rules focus on the procedure followed (and associated fees) for the...

  17. Electric Transmission Lines (Iowa)

    Broader source: Energy.gov [DOE]

    Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

  18. Power line detection system

    DOE Patents [OSTI]

    Latorre, V.R.; Watwood, D.B.

    1994-09-27T23:59:59.000Z

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

  19. Power line detection system

    DOE Patents [OSTI]

    Latorre, Victor R. (Tracy, CA); Watwood, Donald B. (Tracy, CA)

    1994-01-01T23:59:59.000Z

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

  20. Transmission line environmental assessment guidance document

    SciTech Connect (OSTI)

    Jackson, J.; Pentecost, E.; Muzzarelli, J.

    1994-01-01T23:59:59.000Z

    Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

  1. Emergency Fish Restoration Project; Final Report 2002.

    SciTech Connect (OSTI)

    LeCaire, Richard

    2003-03-01T23:59:59.000Z

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleye (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a substantial impact to the economy. During the past several years the Chief Joseph Kokanee Enhancement project has been collecting data pertaining to fish entraining out of the lake through Grand Coulee Dam. During 1996 and 1997 the lake was deeply drawn down to accommodate the limited available water during a drought year and for the highly unusual draw-down of Lake Roosevelt during the critical Northwest power shortage. The goal of the project is to enhance the resident rainbow trout fishery in Lake Roosevelt lost as a result of the unusual operation of Grand Coulee dam during the drought/power shortage.

  2. Transition projects FY 1995 multi-year program plan/fiscal year work plan WBS 1.3.1. and 7.1

    SciTech Connect (OSTI)

    Cartmell, D.B.

    1994-09-01T23:59:59.000Z

    This document presents a complete listing and time line of transitional projects associated with the Purex/UO3 deactivation project at the Hanford reservation.

  3. Cloudnet Project

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Hogan, Robin

    Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

  4. Spent Nuclear Fuel project, project management plan

    SciTech Connect (OSTI)

    Fuquay, B.J.

    1995-10-25T23:59:59.000Z

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  5. Projective lines over one-dimensional semilocal domains

    E-Print Network [OSTI]

    2013-01-21T23:59:59.000Z

    The homogeneous components of an element of q?A are in both q and A (the latter because of the uniqueness of the expression of an element of B = ?? n=0.

  6. EIS-0152: Iroquois, Tenn. Phase I, Pipeline Line Project

    Broader source: Energy.gov [DOE]

    The Federal Energy Regulatory Commission prepared this statement to asses the environmental impacts of constructing and operating an interstate natural gas pipeline and associated infrastructure to transport gas from Canada and domestic sources to the New England Market, as proposed by the Iroquois Gas Transmission System and the Tennessee Gas Pipeline Company. The U.S. Department of Energy Office of Fossil Energy was a cooperating agency during statement development and adopted the statement on 9/1/1990.

  7. Section 1222 Program - Proposed Plains & Eastern Clean Line Project...

    Energy Savers [EERE]

    (DOE) Section 1222 Program is administered by the Office of Electricity Delivery and Energy Reliability (OE). 2. What Is the Process DOE will use to Review Applications Under the...

  8. Sierra Pacific Power Company Alturas Transmission Line Project...

    Broader source: Energy.gov (indexed) [DOE]

    stockpiled soil; cover soil loads while in transit. Increase dust control watering when wind speeds exceed 15 miles per hour, depending upon the soil moisture content. Confine...

  9. EIS-0499: Great Northern Transmission Line Project, Minnesota...

    Energy Savers [EERE]

    2014 EIS-0499: Notice of Intent to Prepare Environmental Impact Statement Contact Julie Smith juliea.smith@hq.doe.gov (202) 258-7668 More Information http:greatnortherntransmissi...

  10. Plains & Eastern Clean Line Project Proposal for New or Upgraded...

    Office of Environmental Management (EM)

    2011) More Documents & Publications EIS-0486: Draft Environmental Impact Statement HVDC Workshop - April 22, 2013 EIS-0486: Notice of Intent and Notice of Potential Floodplain...

  11. Plains & Eastern Clean Line Project Proposal for New or Upgraded...

    Broader source: Energy.gov (indexed) [DOE]

    nameplate of wind resources only). While discussion of solar has thus far been focused on photovoltaic technology, thermal concentrating solar power is also viable in the Resource...

  12. EIS-0463: Northern Pass Transmission Line Project, New Hampshire |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised FindingDepartmentDepartment of Energy Notice of Intent totoExtension

  13. EIS-0474: Southline Transmission Line Project; Arizona and New Mexico |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised FindingDepartmentDepartment ofDepartment of Energy 74: Southline

  14. EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised FindingDepartmentDepartment ofDepartment ofStatement | Department ofLarimer

  15. EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn't Your Destiny:Revised FindingDepartmentDepartmentStatement | Department of EnergyFERCMontana

  16. Northern Pass Transmission Line Project Environmental Impact Statement:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels DataDepartment of Energy Your Density Isn'tOrigin of Contamination in ManyDepartment of Energy NorthB O N N E V I L L E P O W E R A D

  17. Section 1222 Program - Proposed Plains & Eastern Clean Line Project

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO Overview OCHCO OverviewRepository |Complex"Department ofEnergyAward ofFrequently

  18. Proposed Southline Transmission Line Project - Volume 2 of 4

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 |of EnergySelected |Diffusion31548 Vol. 77,

  19. Proposed Southline Transmission Line Project - Volume 3 of 4

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 |of EnergySelected |Diffusion31548 Vol. 77,3 of

  20. Proposed Southline Transmission Line Project - Volume 4 of 4

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 |of EnergySelected |Diffusion31548 Vol. 77,3

  1. Proposed Southline Transmission Line Project - Volume 4 of 4

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 |of EnergySelected |Diffusion31548 Vol. 77,3

  2. Proposed Southline Transmission Line Project - Volume 4 of 4

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn April 23, 2014, an OHASeptember 2010 |of EnergySelected |Diffusion31548 Vol. 77,3

  3. EIS-0463: Northern Pass Transmission Line Project, New Hampshire |

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1Energy |FinalEESS-7 to|GranbyChamplain HudsonDraft

  4. EIS-0499: Great Northern Transmission Line Project, Minnesota | Department

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy China 2015 Business42.1Energy |FinalEESS-7Estes to FlatironTexasDepartmentof Energy of

  5. ERIS Project 

    E-Print Network [OSTI]

    Hunter, Philip

    repositories. If these (generally) smaller institutions wished to continue to have access to these hosted repository spaces after the end of the project, it was proposed that these repository-lite services would be administered by the SDLC (the Scottish Digital...

  6. Ashland Area Support Substation Project

    SciTech Connect (OSTI)

    Not Available

    1992-06-01T23:59:59.000Z

    The Bonneville Power Administration (BPA) provides wholesale electric service to the City of Ashland (the City) by transferring power over Pacific Power Light Company's (PP L) 115-kilovolt (kV) transmission lines and through PP L's Ashland and Oak Knoll Substations. The City distributes power over a 12.5-kV system which is heavily loaded during winter peak periods and which has reached the limit of its ability to serve peak loads in a reliable manner. Peak loads under normal winter conditions have exceeded the ratings of the transformers at both the Ashland and Oak Knoll Substations. In 1989, the City modified its distribution system at the request of PP L to allow transfer of three megawatts (MW's) of electric power from the overloaded Ashland Substation to the Oak Knoll Substation. In cooperation with PP L, BPA installed a temporary 6-8 megavolt-amp (MVA) 115-12.5-kV transformer for this purpose. This additional transformer, however, is only a temporary remedy. BPA needs to provide additional, reliable long-term service to the Ashland area through additional transformation in order to keep similar power failures from occurring during upcoming winters in the Ashland area. The temporary installation of another 20-MVA mobile transformer at the Ashland Substation and additional load curtailment are currently being studied to provide for sustained electrical service by the peak winter period 1992. Two overall electrical plans-of-service are described and evaluated in this report. One of them is proposed for action. Within that proposed plan-of-service are location options for the substation. Note that descriptions of actions that may be taken by the City of Ashland are based on information provided by them.

  7. Project Fact Sheet Project Brief

    E-Print Network [OSTI]

    Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

  8. Line Density Indice as an alternative to MK process

    E-Print Network [OSTI]

    M. Kuassivi

    2009-12-31T23:59:59.000Z

    73 broadband optical spectra of dwarf stars later than F0 have been obtained from the Nearby Stars Project website. The number of absorption lines is computed for each spectrum between 6000 and 6200 Angstrom. A correlation is found between the density of lines K$\\lambda$ and the spectral type. This method is independent of calibration process, does not require high resolution or high signal to noise data and does not make use of a large library of standard spectra.

  9. Omega Transmission Lines

    E-Print Network [OSTI]

    Vehmas, Joni

    2013-01-01T23:59:59.000Z

    In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

  10. Command Line Tools Cloud Computing

    E-Print Network [OSTI]

    Ferrara, Katherine W.

    Command Line Tools Cloud Computing #12;Everybody (or nearly everybody) loves GUI. AWS Command Line of advanced features. After surviving the cloud computing class till now, Your are almost a command line guru! You need AWS command line tools, ec2-api-tools, to maximize the power of AWS cloud computing. Plugging

  11. BP Cherry Point Cogeneration Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2003-09-19T23:59:59.000Z

    BP West Coast Products, LLC (BP or the Applicant) proposes to construct and operate a nominal 720-megawatt (MW), natural-gas-fired, combined-cycle cogeneration facility next to the existing BP Cherry Point Refinery in Whatcom County, Washington. The Applicant also owns and operates the refinery, but the cogeneration facility and the refinery would be operated as separate business units. The cogeneration facility and its ancillary infrastructure would provide steam and 85 MW of electricity to meet the operating needs of the refinery and 635 MW of electrical power for local and regional consumption. The proposed cogeneration facility would be located between Ferndale and Blaine in northwestern Whatcom County, Washington. The Canadian border is approximately 8 miles north of the proposed project site. The Washington State Energy Facility Site Evaluation Council (EFSEC) has jurisdiction over the evaluation of major energy facilities including the proposed project. As such, EFSEC will recommend approval or denial of the proposed cogeneration facility to the governor of Washington after an environmental review. On June 3, 2002, the Applicant filed an Application for Site Certification (ASC No. 2002-01) with EFSEC in accordance with Washington Administrative Code (WAC) 463-42. On April 22, 2003, the Applicant submitted an amended ASC that included, among other things, a change from air to water cooling. With the submission of the ASC and in accordance with the State Environmental Policy Act (SEPA) (WAC 463-47), EFSEC is evaluating the siting of the proposed project and conducting an environmental review with this Environmental Impact Statement (EIS). Because the proposed project requires federal agency approvals and permits, this EIS is intended to meet the requirements under both SEPA and the National Environmental Policy Act (NEPA). The Bonneville Power Administration (Bonneville) and U.S. Army Corps of Engineers (Corps) also will use this EIS as part of their respective decision-making processes associated with the Applicant's request to interconnect to Bonneville's transmission system and proposed location of the project within wetland areas. Therefore, this Draft EIS serves as the environmental review document for SEPA and for NEPA as required by Bonneville for the interconnection and the Corps for its 404 individual permit. The EIS addresses direct, indirect, and cumulative impacts of the proposed project, and potential mitigation measures proposed by the Applicant, as well as measures recommended by EFSEC. The information and resulting analysis presented in this Draft EIS are based primarily on information provided by the Applicant in the ASC No. 2002-01 (BP 2002). Where additional information was used to evaluate the potential impacts associated with the proposed action, that information has been referenced. EFSEC's environmental consultant, Shapiro and Associates, Inc., did not perform additional studies during the preparation of this Draft EIS.

  12. Printed circuit dispersive transmission line

    DOE Patents [OSTI]

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27T23:59:59.000Z

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  13. Evaluation of Instrumentation and Dynamic Thermal Ratings for Overhead Lines

    SciTech Connect (OSTI)

    Phillips, A.

    2013-01-31T23:59:59.000Z

    In 2010, a project was initiated through a partnership between the Department of Energy (DOE) and the New York Power Authority (NYPA) to evaluate EPRI?s rating technology and instrumentation that can be used to monitor the thermal states of transmission lines and provide the required real-time data for real-time rating calculations. The project included the installation and maintenance of various instruments at three 230 kV line sites in northern New York. The instruments were monitored, and data collection and rating calculations were performed for about a three year period.

  14. Formation depths of Fraunhofer lines

    E-Print Network [OSTI]

    Gurtovenko, E A

    2015-01-01T23:59:59.000Z

    We have summed up our investigations performed in 1970--1993. The main task of this paper is clearly to show processes of formation of spectral lines as well as their distinction by validity and by location. For 503 photospheric lines of various chemical elements in the wavelength range 300--1000 nm we list in Table the average formation depths of the line depression and the line emission for the line centre and on the half-width of the line, the average formation depths of the continuum emission as well as the effective widths of the layer of the line depression formation. Dependence of average depths of line depression formation on excitation potential, equivalent widths, and central line depth are demonstrated by iron lines.

  15. UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group current C3E Ambassadors and U.S.MANAGEMENT Annual DEPARTMENT OFUNLV

  16. Wireless Sensor Network for Electric Transmission Line Monitoring

    SciTech Connect (OSTI)

    Alphenaar, Bruce

    2009-06-30T23:59:59.000Z

    Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization applications to deliver real-time information to federal agencies and others tasked with grid reliability (Tasks 6,8)

  17. PROJECT SUMMARY

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIAProperty Management PlanPROJECT SUMMARY 1

  18. Hallmark Project

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaefer To: CongestionDevelopmentHEADQUARTERSOutreachApril 23, 2013Project

  19. Project Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENA creates

  20. Project Overview

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagement

  1. Projects | ORNL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of Science (SC)IntegratedSpeedingTechnical News,Program DirectionProject ATHENAManagementIn ThisPages

  2. Project Gnome

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject Final Report: HPC-Colony IIProject Gnome

  3. Project Title

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible forPortsmouth/Paducah47,193.70 Hg MercuryProject FinalFluids |Storage Research and

  4. NEPA COMPLIANCE SURVEY Project Information Project Title:

    Broader source: Energy.gov (indexed) [DOE]

    Boxes Date: Nov. 11 , 2010 DOE Code: 6740.010.00000 Contractor Code: 8067-451 Project Lead: Anthony Bowler Project Overview 1. Brief project description include anything that...

  5. Fifteenmile Creek Riparian Buffers Project, Annual Report 2002-2003.

    SciTech Connect (OSTI)

    Graves, Ron

    2004-02-01T23:59:59.000Z

    This project implements riparian buffer systems in the Mid-Columbia, addressing limiting factors identified in the Fifteenmile Subbasin Summary, June 30, 2000. The project is providing the technical planning support needed to implement at least 36 riparian buffer system contracts on approximately 872 acres covering an estimated 40 miles of anadromous fish streams over a three year period. During this second year of the project, 11 buffer contracts were implemented on 10.9 miles of stream. Buffer widths averaged 132 ft. on each side of the stream. Implementation included prescribed plantings, fencing, and related practices. Actual implementation costs, lease payments, and maintenance costs are borne by existing USDA programs: Conservation Reserve and Conservation Reserve Enhancement Programs. The lease period of each contract may vary between 10 to 15 years. During this year the average was 14.6 years. The total value of contracts established this year is $666,121 compared with $71,115 in Bonneville Power Administration (BPA) contract costs to provide the technical support needed to get the contracts implemented. This project provides technical staffing to conduct assessments and develop plans to help keep pace with the growing backlog of potential riparian buffer projects. Word of mouth from satisfied customers has brought in many new sign-ups during the year. In addition, specific outreach efforts targeting the orchard areas of the county began to bear fruit with orchardists sign-ups as the project year ended. Progress this second year of project includes only work accomplished in the Fifteenmile subbasin. A similar but separate effort to implement buffers in the Columbia Plateau Province was initiated during the year under project number 2002-019-00. This project supports RPA 150 and 153 as required under the Federal Hydropower System biological opinion.

  6. Drill string transmission line

    DOE Patents [OSTI]

    Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

    2006-03-28T23:59:59.000Z

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  7. Transmission line: design manual

    SciTech Connect (OSTI)

    Farr, H.H.

    1980-01-01T23:59:59.000Z

    The purpose of this manual is to outline the various requirements for, and the procedures to be followed in the design of power transmission lines by the Bureau of Reclamation, US Department of the Interior. Numerous design studies, which have been made on specific aspects of transmission line design, are included with explanations of their applications. Information is presented concerning such aspects as selection of type of construction, conductor sags and tensions, insulation, lightning protection, clearance patterns, galloping conductors, structure limitation and guying charts, and structure spotting. Structure design examples are limited to wood-pole construction. Interpretations of the National Electrical Safety Code and other codes are made as required. Some of the example problems were developed when the sixth edition of NESC was current, and are so noted; however, most examples use the 1977 edition of NESC.

  8. INL Wind Farm Project Description Document

    SciTech Connect (OSTI)

    Gary Siefert

    2009-07-01T23:59:59.000Z

    The INL Wind Farm project proposes to install a 20 MW to 40 MW wind farm on government property, consisting of approximately ten to twenty full-sized (80-meter hub height) towers with 2 MW turbines, and access roads. This includes identifying the optimal turbine locations, building access roads, and pouring the tower foundations in preparation for turbine installation. The project successfully identified a location on INL lands with commercially viable wind resources (i.e., greater than 11 mph sustained winds) for a 20 to 40 MW wind farm. Additionally, the proposed Wind Farm was evaluated against other General Plant Projects, General Purpose Capital Equipment projects, and Line Item Construction Projects at the INL to show the relative importance of the proposed Wind Farm project.

  9. Designation of EM Federal Project Director for the Hanford Waste Treatment

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOEThe Bonneville Power Administration wouldDECOMPOSITIONPortalToDepthand Immobilization Plant Project, Office

  10. DOE Energy Challenge Project

    SciTech Connect (OSTI)

    Frank Murray; Michael Schaepe

    2009-04-24T23:59:59.000Z

    Project Objectives: 1. Promote energy efficiency concepts in undergraduate and graduate education. 2. Stimulate and interest in pulp and paper industrial processes, which promote and encourage activities in the area of manufacturing design efficiency. 3. Attract both industrial and media attention. Background and executive Summary: In 1997, the Institute of Paper Science and Technology in conjunction with the U.S. Department of Energy developed a university design competition with an orientation to the Forest Products Industry. This university design competition is in direct alignment with DOE’s interests in instilling in undergraduate education the concepts of developing energy efficient processes, minimizing waste, and providing environmental benefits and in maintaining and enhancing the economic competitiveness of the U.S. forest products industry in a global environment. The primary focus of the competition is projects, which are aligned with the existing DOE Agenda 2020 program for the industry and the lines of research being established with the colleges comprising the Pulp and Paper Education and Research Alliance (PPERA). The six design competitions were held annually for the period 1999 through 2004.

  11. Device Oriented Project Controller

    SciTech Connect (OSTI)

    Dalesio, Leo; Kraimer, Martin

    2013-11-20T23:59:59.000Z

    This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.

  12. Power Lines and Crops Can Be Good Neighbors

    SciTech Connect (OSTI)

    none,

    2010-08-01T23:59:59.000Z

    Two of the Pacific Northwest’s greatest economic assets are its wealth of agriculture and its clean and reliable electricity fueled largely by hydropower. Sometimes the two intersect. Transmission lines carrying electricity to the region’s farms, businesses and homes must, of necessity, span large areas where people grow crops and orchards. To ensure a safe and reliable flow of electricity across these expanses, trees and other vegetation must be managed to certain standards. At the same time, the Bonneville Power Administration — which owns and operates three-quarters of the region’s high-voltage transmission — recognizes the importance of our region’s agricultural bounty. We are committed to working with individuals and agricultural communities to facilitate ongoing land-use activities in transmission rights-of-way as long as those uses are compatible with transmission safety and reliability standards. Our goal with vegetation management is to keep you and your property safe while protecting the reliability of our region’s electricity system. By working together, BPA and landowners can protect the system and public safety.

  13. Communicating in a multi-project environment with a single-sheet project plan

    SciTech Connect (OSTI)

    Furaus, J.P.; Figueroa-McInteer, C.; Glidewell, D.D.; McKeever, P.S.; Hendrick, W.E.; Wisler, D.B.; Zavadil, J.T.

    1995-07-01T23:59:59.000Z

    In June 1992, the Corporate Construction Program Office was formed to provide single-point accountability for managing all corporate-sponsored construction projects at Sandia, answering to upper Sandia management as well as Sandia`s primary external customer, the U.S. DOE. CCPO had 3 major areas of responsibility: Congressional line-item projects (>$2 million), general plant projects (<$2 million), and corporate-funded major rearrangements (renovations). A single-sheet project plan (``summary sheet``), with monthly updates, was developed for every project. Each month, the sheets are duplicated and placed in a ``project summary book`` that is distributed through various communication channels at Sandia. Despite many modifications, the summary sheet has remained simple and useful to a broad range of project stakeholders. This paper describes how the sheet`s design and implementation enhances communication across Sandia`s complex, multi-program environment.

  14. CX-008690: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Lancaster Line and Load Project CX(s) Applied: B4.6, B4.7 Date: 06/28/2012 Location(s): Idaho Offices(s): Bonneville Power Administration

  15. CX-008704: Categorical Exclusion Determination

    Broader source: Energy.gov [DOE]

    Grand Coulee-Bell No. 3 Double Circuit 230 Kilovolt Transmission Line Reconductoring Project CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

  16. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    confident in our ability to continue to deliver the utmost value from the Columbia River power system to our utility customers and the people of the Northwest." Gendron has more...

  17. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to balance variable energy resources. Examples include BPA's funding to develop a demand response market for Northwest commercial and industrial customers, to perform...

  18. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    transmission technologies, data intelligence, next-generation energy efficiency and demand response technologies, and address a host of other gaps. BPA expects to fund 3...

  19. October 17, 2002 Bonneville Power Administration

    E-Print Network [OSTI]

    considered - conservation and renewable energy are more cost effective than their alternatives. PacifiCorp demonstrates this knowledge with the integrated resource plan to create 3000 new megawatts of renewable energy a decade of flat growth · Geothermal has suffered tax inequity relative to other renewable energies and gas

  20. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and next-generation energy efficiency and demand response technologies. A copy of each roadmap is available on BPA's Technology Innovation homepage. BPA develops its direction with...

  1. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    and renewable resources to be developed through 2024. These amounts of conservation and renewables were through 2020. An understanding of the stack of low-carbon resources and their cost will help policy makers amounts of wind or other intermittent resources will very likely require addition of other resources

  2. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Joel Scruggs, 503-230-5511 503-230-5131 BPA headquarters now 'gold certified' for sustainability First federal agency certified in City of Portland's sustainability program...

  3. PASSAGE OF SHAD AT THE BONNEVILLE FISHWAYS

    E-Print Network [OSTI]

    of the data^* C. J. Burner and K. G, Weber made many helpful suggestions during the progress of the studyj R much of the factual information, and suggested methods of analyzing the data. I am indebted to Ivan into two channels by Bradford Island. The spillway dam is in the north channel, and the powerhouse, which

  4. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    controlling lights and air conditioning systems. Other potential applications include daylight harvesting, daylighting system commissioning, occupancy logging and daylight logging,...

  5. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in Washougal, Wash. Through energy efficiency measures and upgrades to chillers, air compressors and lighting, Fitesa Washougal Inc. cut its energy use by about 19 percent, or 2.5...

  6. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    and anticipates having completed in lieu guidelines for sponsors in place prior to future proposal solicitations & Conservation Council Mr. Bruce Measure, Northwest Power & Conservation Council Ms. Rhonda Whiting, Northwest

  7. Department of Energy Bonneville Power Administration

    E-Print Network [OSTI]

    . Ball ­ DR-7C P. Zimmer ­ DR-7C G. Delwiche ­ KE-4 J. Curtis ­ KF-2 R. Roach ­ L-7 P. Norman ­ P-6 K

  8. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    both public and private schools, traveled from as far as Republic, Wash., and Ashland, Ore., to compete. Many practiced for months, in groups and individually, for the...

  9. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of both public and private schools, traveled from as far as Republic, Wash., and Ashland, Ore., to compete. Many had practiced for the competition for months, in groups and...

  10. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    western and central Oregon - from as far north as Republic, Wash., and as far south as Ashland, Ore. Many practice for months, in groups and individually, for the competition,...

  11. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and western and central Oregon - from as far north as Bellingham to as far south as Ashland. Many of the students will practice for months in advance of the competition in both...

  12. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    expansion of the dam system, with a score by Oscar-winning composer Ernest Gold. As a bonus, the set includes a booklet of movie posters and photographs, as well as introductions...

  13. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    utility and BPA staff and our members is essential to achieving the region's energy conservation goals," says Stan Price, executive director of the Northwest Energy Efficiency...

  14. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    15, 2013 CONTACT: Joel Scruggs, 503-230-5511 503-230-5131 BPA launches Science Lab videos for National Engineers Month Watch and learn: BPA engineers fuse science and fun...

  15. Distribution: Sonya Baskerville, Bonneville Power Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    field and site offices to consistently and accurately collect and report financial data related to the operation and maintenance of real property assets owned or leased by the...

  16. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ore., bested 16 rounds of competitors from across western Washington and Oregon to win the BPA Regional Science Bowl this weekend at the University of Portland. The final,...

  17. Categorical Exclusion Determinations: Bonneville Power Administration |

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directed offOCHCO OverviewAttachments EnergyFebruary3 Categorical Exclusion

  18. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I3 13

  19. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I3 133

  20. BONNEVILLE POWER ADMINISTRATION FOR IMMEDIATE RELEASE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office511041cloth DocumentationProductsAlternativeOperationalAugustDecade Later: Are WeOverview:R A D M I3 1333