1

Implementation Plan for Tank Farm Transition Projects Suspect and Counterfeit Items  

SciTech Connect (OSTI)

This plan is designed to provide an appropriate level of confidence that Tank Farm Transition Projects (TFTP) facilities will be evaluated to assess the presence of suspect/counterfeit items. It is intended to identify suspect/counterfeit items that are presently in inventory and provide for the reporting and disposition of those items. Items which have been installed will also receive appropriate evaluation using a graded approach to achieve optimum results balanced against safety considerations and cost effectiveness.

TRUE, R.R.

2000-03-16T23:59:59.000Z

2

EIS-0447: Champlain Hudson Power Express Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the...

3

EA-1880: Big Bend to Witten Transmission Line Project, South...  

Office of Environmental Management (EM)

880: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with...

4

Conceptual design report for environmental, safety and health phase III FY-91 line item  

SciTech Connect (OSTI)

The Mound Facility (Mound), located in Miamisburg, Ohio, is a Department of Energy (DOE) development and production facility performing support work for DOE`s weapons and energy-related programs. EG&G Mound Applied Technologies (EG&G) is the Operating Contractor (OC) for this Government-Owned, Contractor-Operated (GOCO) facility. The work performed at Mound emphasizes nuclear energy and explosives technology. Mound is currently implementing an Environmental, Safety, and Health (ES&H) Program designed to protect its employees, the public, and the environment from adverse effects caused by the facility`s activities. Design has been completed, and construction is in progress for Phase I of this multiphase program. Phase II has been submitted for fiscal year (FY) 89 funding and Phase IV is being submitted as an FY 92 line item. This Conceptual Design Report (CDR) addresses Phase III of the ES&H program.

NONE

1988-09-01T23:59:59.000Z

5

Determining importance and grading of items and activities for the Yucca Mountain Project  

SciTech Connect (OSTI)

Raytheon Services Nevada (RSN), in support of the Department of Energy`s (DOE) Yucca Mountain Project, has been responsible for the Title 2 designs of the initial structures, systems, and components for the Exploratory Studies Facility (ESF), and the creation of the design output documents for the Surface-Based Testing (SBT) programs. The ESF and SBT programs are major scientific contributors to the overall site characterization program which will determine the suitability of Yucca Mountain to contain a proposed High Level Nuclear Waste (HLNW) repository. Accurate, traceable and objective characterization and testing documentation that is germane to the protection of public health and safety, and the environment, and that satisfies all the requirements of 10 CFR Part 60(1), must be established, evaluated and accepted. To assure that these requirements are satisfied, specific design functions and products, including items and activities depicted within respective design output documents, are subjected to the requirements of an NRC and DOE-approved Quality Assurance (QA) program. An evaluation (classification) is applied to these items and activities to determine their importance to radiological safety (ITS) and waste isolation (ITWI). Subsequently, QA program controls are selected (grading) for the items and activities. RSN has developed a DOE-approved classification process that is based on probabilistic risk assessment (PRA) techniques and that uses accident/impact scenarios. Results from respective performance assessment and test interference evaluations are also integrated into the classification analyses for various items. The methodology and results of the RSN classification and grading processes, presented herein, relative to ESF and SBT design products, demonstrates a solid, defensible methodological basis for classification and grading.

DeKlever, R. [Raytheon Services Nevada, Las Vegas, NV (United States); Verna, B. [Dept. of Energy, Las Vegas, NV (United States)

1993-12-31T23:59:59.000Z

6

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH  

E-Print Network [OSTI]

Project: UAF Utilities Waste Line Repairs Ch6 to Ch13 Project No: 2013101 UTWH Subject: Project Schedule Project Duration: May 27 to August 10, 2014 The sewer line will be constructed in phases

Ickert-Bond, Steffi

7

Proposed Project: Plains & Eastern Clean Line | Department of...  

Broader source: Energy.gov (indexed) [DOE]

the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy...

8

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

9

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by the Bureau of Reclamation to design and construct six new 500-kV overhead transmission lines at Grand Coulee Dam. BPA will replace the existing underground transmission...

10

A projective Simson line Geoff Smith, University of Bath  

E-Print Network [OSTI]

A projective Simson line Geoff Smith, University of Bath 15th October 2014 This is a preprint-profit making educational or research pur- poses. c G. C. Smith October 15 2014 Introduction Let ABC

Smith, Geoff

11

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

SciTech Connect (OSTI)

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

2012-01-01T23:59:59.000Z

12

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Location of seismic lines carried out under DOE funded project Advanced Seismic Data Analysis Program (The Hot Pot Project).

Lane, Michael

13

GLIDES PROJECT GuideLines Into DEcision Support  

E-Print Network [OSTI]

GLIDES PROJECT GuideLines Into DEcision Support sponsored by The Agency for Healthcare Research;Topics · GLIDES 4-level "stack" ­ NarraAve guideline with quality, implementabilityLon, and local coding/linking ­ To Formal Quality Measure via QDM, eMeasure · BRIDGE

Lee, Daeyeol

14

Multi-tower line focus Fresnel array project  

SciTech Connect (OSTI)

As an alternative to conventional tracking solar thermal trough systems, one may use line focus Fresnel reflector systems. In a conventional Fresnel reflector design, each field of reflectors is directed to a single tower. However efficient systems of very high ground utilisation can be setup if a field of reflectors uses multiple receivers on different towers. This paper describes a line focus system, called the compact linear fresnel reflector system and a project to produce an initial 95 MWth solar array. The array will be used as a retrofit preheater for a coal fired generating plant.

Mills, D.R.; Morrison, G.; Pye, J.; Le Lievre, P. [Solar Heat & Power SHP Pty. Ltd., Sydney, NSW (Australia)

2006-02-15T23:59:59.000Z

15

DATA SHARING REPORT CHARACTERIZATION OF THE SURVEILLANCE AND MAINTENANCE PROJECT MISCELLANEOUS PROCESS INVENTORY WASTE ITEMS OAK RIDGE NATIONAL LABORATORY, Oak Ridge TN  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, to provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested ORAU to plan and implement a sampling and analysis campaign to target certain items associated with URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing for final disposal. This waste was generated during processing, surveillance, and maintenance activities associated with the facilities identified in the process knowledge (PK) provided in Appendix A. A list of items for sampling and analysis were generated from a subset of materials identified in the WHP populations (POPs) 4, 5, 6, 7, and 8, plus a small number of items not explicitly addressed by the WHP. Specifically, UCOR S&M project personnel identified 62 miscellaneous waste items that would require some level of evaluation to identify the appropriate pathway for disposal. These items are highly diverse, relative to origin; composition; physical description; contamination level; data requirements; and the presumed treatment, storage, and disposal facility (TSDF). Because of this diversity, ORAU developed a structured approach to address item-specific data requirements necessary for acceptance in a presumed TSDF that includes the Environmental Management Waste Management Facility (EMWMF)using the approved Waste Lot (WL) 108.1 profilethe Y-12 Sanitary Landfill (SLF) if appropriate; EnergySolutions Clive; and the Nevada National Security Site (NNSS) (ORAU 2013b). Finally, the evaluation of these wastes was more suited to a judgmental sampling approach rather than a statistical design, meaning data were collected for each individual item, thereby providing information for item-byitem disposition decisions. ORAU prepared a sampling and analysis plan (SAP) that outlined data collection strategies, methodologies, and analytical guidelines and requirements necessary for characterizing targeted items (ORAU 2013b). The SAP described an approach to collect samples that allowed evaluation as to whether or not the waste would be eligible for disposal at the EMWMF. If the waste was determined not to be eligible for EMWMF disposal, then there would be adequate information collected that would allow the waste to be profiled for one of the alternate TSDFs listed above.

Weaver, Phyllis C

2013-12-12T23:59:59.000Z

16

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin)  

Broader source: Energy.gov [DOE]

This page describes application requirements for all projects that involve the installation of an electricity transmission line or substation that also require either a Certificate of Public...

17

EIS-0317: Kangley-Echo Lake Transmission Line Project  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's proposal to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area.

18

EIS-0101: Thermopolis, Alcova, Casper Transmission Line Project  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this statement to evaluate the environmental impacts of constructing, operating and maintaining a 230-kilovolt transmission line between Thermopolis, Wyoming, and Alcova, Wyoming, and a 230/345-kilovolt transmission line between Alcova, Wyoming, and Casper, Wyoming.

19

A conjugate Rosen's gradient projection method with global line search for piecewise linear optimization  

E-Print Network [OSTI]

A conjugate Rosen's gradient projection method with global line search for piecewise linear cutting plane method, simplex method, Rosen's gradient projection, conjugate gradient. 1 Introduction the zig-zagging of the gradient projection, we propose a conjugate gradient version of the face simplex

Beltran-Royo, Cesar

20

EIS-0106: Great Falls-Conrad Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The Western Area Power Administration prepared this EIS to evaluate the environmental impacts of the construction and operation of a 230-kilovolt transmission line from Great Falls, Montana, to Conrad, Montana.

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of a proposal to rebuild DOEs Bonneville Power Administrations Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

22

A Representation of Projective Space by the Points of a Line  

E-Print Network [OSTI]

fG fW. 1911 (Mathematics) Representation of project ive space by the points o JL i-ii^5 A REPRESENTATION OF PROJECTIVE SPACE BY THE POINTS OF A LINE. GEORGE TOLLMAN "BESS. A thesis submitted in partial fulfilment of the requirements...-to-one recipro- cal correspondence with the elements of another planar pencil, which may be either a pencil of points on the same line 1 or on a line distinct from 1 or a pencil of planar lines [l 1!. EJLfiSfif 'EfiCiSfifiaiixaiifia. If IF*] and [O1...

Hess, George Wellman

1911-05-01T23:59:59.000Z

23

Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

24

EIS-0124: Conrad-Shelby Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Western Area Power Administration developed this statement to assess the environmental impact of adding a 230 kV transmission line between Conrad and Shelby, Montana and a new substation near Shelby to update the stressed electrical transmission system.

25

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada.

26

EIS-0499: Great Northern Transmission Line Project, Minnesota  

Broader source: Energy.gov [DOE]

This EIS will evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 750-megawatt electric transmission system across the U.S.-Canada border. The proposed 220 mile transmission line would cross the border near Roseau, Minnesota, and continue to Grand Rapids, Minnesota.

27

EIS-0090: Fort Peck-Havre Transmission Line Project, Montana  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Western Area Power Administration prepared this statement to assess the potential environmental and socioeconomic implications of its proposed action to construct and operate a 230kV transmission line from Fort Peck to Havre, Montana, with three intermediate interconnecting substations.

28

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Seismic Line Location Map Hot Pot Project, Humboldt County, Nevada 2010. ArcGIS map package containing topographic base map, Township and Range layer, Oski BLM and private leases at time of survey, and locations, with selected shot points, of the five seismic lines.

Michael Lane

29

EIS-0256: Sierra Pacific Power Company Alturas Transmission Line Project (adopted from BLM)  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental setting and consequences of the construction and operation of the proposal Alturas Transmission Line Project. Sierra Pacific Power Company (SPPCO) has proposed this electric power transmission line to improve the existing operational capacity and reliability of its power transmission system and provide for anticipated growth in demand for electric power.

30

Towards Software Product Lines Application in the Context of a Smart Building Project  

E-Print Network [OSTI]

Towards Software Product Lines Application in the Context of a Smart Building Project Thibaut. This paper presents proposals on how to apply software prod- uct lines in the context of smart buildings the various components involved in smart buildings, and to capitalize on the devel- oped IT components

Paris-Sud XI, Universit de

31

2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles  

E-Print Network [OSTI]

2014 NSERC USRA Summer Projects Power Line Communications for Electric Vehicles Prof. Victor C become significant, especially in electric vehicles (EVs) of the future, which are highly sophisticated.M. Leung (vleung@ece.ubc.ca) 1. Project description In today's electric and conventional combustion engine

Leung, Victor C.M.

32

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect (OSTI)

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

33

Pauli graph and finite projective lines/geometries  

E-Print Network [OSTI]

The commutation relations between the generalized Pauli operators of N-qudits (i. e., N p-level quantum systems), and the structure of their maximal sets of commuting bases, follow a nice graph theoretical/geometrical pattern. One may identify vertices/points with the operators so that edges/lines join commuting pairs of them to form the so-called Pauli graph P_{p^N} . As per two-qubits (p = 2, N = 2) all basic properties and partitionings of this graph are embodied in the geometry of the symplectic generalized quadrangle of order two, W(2). The structure of the two-qutrit (p = 3, N = 2) graph is more involved; here it turns out more convenient to deal with its dual in order to see all the parallels with the two-qubit case and its surmised relation with the geometry of generalized quadrangle Q(4, 3), the dual of W(3). Finally, the generalized adjacency graph for multiple (N > 3) qubits/qutrits is shown to follow from symplectic polar spaces of order two/three. The relevance of these mathematical concepts to mutually unbiased bases and to quantum entanglement is also highlighted in some detail.

Michel R. P. Planat; Metod Saniga

2007-03-16T23:59:59.000Z

34

EIS-0317-S1: Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives.

35

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

36

Project W-314 sn-630 transfer line az-02a to an-b acceptance for beneficial use  

SciTech Connect (OSTI)

Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

Warnick, T.L., Westinghouse Hanford, Richland, WA

1997-09-29T23:59:59.000Z

37

Project W-314 sn-634 transfer line a-b to ax-b acceptance for beneficial use  

SciTech Connect (OSTI)

Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

Warnick, T.L., Westinghouse Hanford, Richland, WA

1997-09-29T23:59:59.000Z

38

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register  

Broader source: Energy.gov [DOE]

The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

39

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

40

Line Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocsCenterCenter (LMI-EFRC) -PrinciplesLeeLinda

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Evaluation of Canal Lining Projects in the Lower Rio Grande Valley  

E-Print Network [OSTI]

?unintentional?vandalism,?and?normal?irrigation?district?operational?and?maintenance? activities.??Each?project?was?evaluated?using?a?visual?inspection?process?during?which? performance/condition?ratings?were?assigned.? ? Without?question,?the?best?lining?system?is?a?synthetic?liner?with?a?protective?barrier?of? shotcrete.??The?synthetic?liner?significantly?reduces?seepage,?while?the?shotcrete?protects...?it? from?damage.??This?lining?system?needs?little?to?no?maintenance.??There?were?two?types?of? liners?used:?PVC?and?polyester.??Each?performed?equally?as?well.? ? The?performance?of?synthetic?liners?without?a?protective...

Karimov, Askar; Leigh, Eric; Fipps, Guy

42

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect (OSTI)

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

43

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) with USDA Forest Service, Arapaho and Roosevelt National Forest, as a cooperating agency is preparing an EIS that analyzes the potential environmental impacts of a proposal to rebuild and upgrade two 115-kilovolt single-circuit transmission lines between the Flatiron Substation and the intersection of Mall Road and U.S. Highway 36 in Estes Park, Larimer County, Colorado. Additional information is available on Westerns project website.

44

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

45

EIS-0400: Granby Pumping Plant Switchyard-Windy Gap Substation Transmission Line Rebuild Project, Grand County, CO  

Broader source: Energy.gov [DOE]

Western Area Power Administration prepared an EIS, with the U.S. Forest Service, Bureau of Land Management, and Grand County (Colorado) as cooperating agencies, to evaluate the potential environmental impacts of rebuilding a 12-mile, 69 kV electric transmission line in Grand County. The proposed project would rebuild the single-circuit line as a double-circuit transmission line and add a second power transformer. Western identified potentially significant impacts while preparing an EA for this proposal (DOE/EA-1520) and prepared an EIS instead of completing the EA. Further information about the project is available on the project website.

46

Design and Manufacture of the RF Power Supply and RF Transmission Line for SANAEM Project Prometheus  

E-Print Network [OSTI]

A 1-5 MeV proton beamline is being built by the Turkish Atomic Energy Authority in collaboration with a number of graduate students from different universities. The most important aspect of the project, is to acquire the design ability and manufacturing capability of all the components locally. SPP will be an accelerator and beam diagnostics test facility and it will also serve the detector development community with its low beam current. This paper discusses the design and construction of the RF power supply and the RF transmission line components such as its waveguide converters and its circulator.

Turemen, G; Unel, G; Alacakir, A

2015-01-01T23:59:59.000Z

47

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

48

The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata  

SciTech Connect (OSTI)

The Genomes On Line Database (GOLD) is a comprehensive resource of information for genome and metagenome projects world-wide. GOLD provides access to complete and ongoing projects and their associated metadata through pre-computed lists and a search page. The database currently incorporates information for more than 2900 sequencing projects, of which 639 have been completed and the data deposited in the public databases. GOLD is constantly expanding to provide metadata information related to the project and the organism and is compliant with the Minimum Information about a Genome Sequence (MIGS) specifications.

Fenner, Marsha W; Liolios, Konstantinos; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Kyrpides, Nikos C.

2007-12-31T23:59:59.000Z

49

The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata  

SciTech Connect (OSTI)

The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

2009-09-01T23:59:59.000Z

50

NQA-1 Requirements for Commercial Grade Item Acceptance: ICONE20-54738  

SciTech Connect (OSTI)

Objectives are: (1) Present the DOE Chemistry and Metallurgy Research Replacement (CMRR) Project Commercial Grade Item (CGI) Dedication Process; and (2) Present CMRR Project CGI Lessons-Learned.

Van Valkenburg, Taunia S. [Los Alamos National Laboratory; Holmes, Richard A. [Los Alamos National Laboratory; Tepley, Daniel J. [Los Alamos National Laboratory; Sandquist, Gary [APPLIED SCIENCE PROFESSIONALS

2012-07-19T23:59:59.000Z

51

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. (Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System); and Attachment 2, Contractor Requirements Document (paragraph 1d regarding a project management system). Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3 Chg 1.

2000-10-13T23:59:59.000Z

52

Program and Project Management for the Acquisition of Capital Assets  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To provide Department of Energy (DOE), including the National Nuclear Security Administration (NNSA), project management direction for the acquisition of capital assets that are delivered on schedule, within budget, and fully capable of meeting mission performance and environmental, safety and health standards. Cancels DOE O 430.1A, paragraphs 6e(7); 7a(3); 7b(11); 7b(14); 7c(4), (6), (7), (11) and (16); 7d(4) and (8); 7e(3), (10), and (17); Attachment 1, Definitions (items 30 - Line Item Project; item 42 - Project, item 48 - Strategic System; and Attachment 2, Contractor Requirements Document paragraph 1d regarding a project management system. Cancels DOE N 430.1 and DOE O 430.1A (in part). Canceled by DOE O 413.3A.

2000-10-13T23:59:59.000Z

53

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

Not Available

1994-02-01T23:59:59.000Z

54

The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy is reopening the public scoping period for the Northern Pass Transmission Line Project Environmental Impact Statement (EIS).

55

Announcement of Change in Public Meeting Location for the Northern Pass Transmission Line Project Published in the Federal Register  

Broader source: Energy.gov [DOE]

The Department announces a change of location for the September 26, 2013 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. The meeting will be from 5 to 8 p.m.

56

OE Issues Notice of Intent to Prepare an Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project  

Broader source: Energy.gov [DOE]

On December 21, 2012, DOEs Office of Electricity Delivery and Energy Reliability (OE) issued a Notice of Intent (NOI) to Prepare an Environmental Impact Statement (EIS) for the Plains & Eastern Clean Line Transmission Project on behalf of the Department and Southwestern Power Administration

57

Development of a special nuclear materials monitoring sensor pack for Project Straight-Line  

SciTech Connect (OSTI)

With the end of the Cold War and the accelerated dismantlement of nuclear weapons, the nuclear material inventory of the United States is growing. In addition, the United States has offered these excess weapons-grade nuclear material assets for international inspections with the intent of encouraging reciprocal action by other nations. In support of this policy, Sandia National Laboratories has initiated a pilot effort (Project Straight-Line) to develop a flexible, site-independent system to continuously and remotely monitor stored nuclear material and integrate the collection, processing, and dissemination of information regarding this material to ensure that declared nuclear materials placed in storage remain in place, unaltered, and stable. As part of this effort, a +3.6V battery powered, modular sensor pack has been developed to monitor total radiation dose, radiation dose rate, and the temperature of each nuclear material container and to provide this information using a standardized sensor interface. This paper will discuss the development of the sensors, the engineering and production of the sensor pack units, and their installation and operation at sites in New Mexico, California, and the Pantex plant in Amarillo.

Daily, M.R.; Moreno, D.J.; Tolk, K.M.; Wilcoxen, J.L. [Sandia National Labs., Albuquerque, NM (United States); Oetken, R.E.; Collins, J.E.; Miller, R.; Olsen, R.W. [Sandia National Labs., Livermore, CA (United States); Sheets, L. [Allied-Signal, Kansas City, MO (United States). Kansas City Division

1995-12-31T23:59:59.000Z

58

New technologies for item monitoring  

SciTech Connect (OSTI)

This report responds to the Department of Energy`s request that Sandia National Laboratories compare existing technologies against several advanced technologies as they apply to DOE needs to monitor the movement of material, weapons, or personnel for safety and security programs. The authors describe several material control systems, discuss their technologies, suggest possible applications, discuss assets and limitations, and project costs for each system. The following systems are described: WATCH system (Wireless Alarm Transmission of Container Handling); Tag system (an electrostatic proximity sensor); PANTRAK system (Personnel And Material Tracking); VRIS (Vault Remote Inventory System); VSIS (Vault Safety and Inventory System); AIMS (Authenticated Item Monitoring System); EIVS (Experimental Inventory Verification System); Metrox system (canister monitoring system); TCATS (Target Cueing And Tracking System); LGVSS (Light Grid Vault Surveillance System); CSS (Container Safeguards System); SAMMS (Security Alarm and Material Monitoring System); FOIDS (Fiber Optic Intelligence & Detection System); GRADS (Graded Radiation Detection System); and PINPAL (Physical Inventory Pallet).

Abbott, J.A. [EG & G Energy Measurements, Albuquerque, NM (United States); Waddoups, I.G. [Sandia National Labs., Albuquerque, NM (United States)

1993-12-01T23:59:59.000Z

59

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Broader source: Energy.gov (indexed) [DOE]

Florence, Oregon. Additional information is available at the project website: http:efw.bpa.govenvironmentalservicesDocumentLibraryLane-Wendson. PUBLIC COMMENT OPPORTUNITIES...

60

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect (OSTI)

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

Not Available

1991-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

EIS-0332: McNary-John Day Transmission Line Project, OR  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to construct, operate, and maintain a 79-mile-long 500-kilovolt transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon.

62

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

63

EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Westerns transmission system.

64

Microsoft Word - config item  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't32 MasterAcquisiti ---- ContraCITSS Configurable Item List COTS

65

EA-1671: Big River Substation to Poston Substation 69-Kilovolt Transmission Line Project, Arizona and California  

Broader source: Energy.gov [DOE]

The Department of the Interiors Bureau of Indian Affairs considered preparing this EA, with DOEs Western Area Power Administration as a cooperating agency. This project has been canceled.

66

EA-1948: Gila-North Gila Transmission Line Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration (Western) prepared this EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Services construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies.

67

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

68

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana  

Broader source: Energy.gov [DOE]

DOEs Bonneville Power Administration (BPA) is preparing an EIS that will analyze the potential environmental impacts of a proposal to rebuild approximately 120 miles of existing transmission line in Sanders, Lake, Missoula, Granite, Powell, and Deer Lodge Counties in Montana. Additional information is available at http://efw.bpa.gov/environmental_services/Document_Library/HotSpringsAna....

69

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York  

Broader source: Energy.gov [DOE]

This EIS evaluated the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City.

70

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona  

Broader source: Energy.gov [DOE]

Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long DavisKingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

71

EIS-0134: Charlie Creek-Belfield Transmission Line Project, North Dakota  

Broader source: Energy.gov [DOE]

The Western Area Power Administration developed this EIS to assess the environmental impact of constructing a high voltage transmission line between Charlie Creek and Belfield, North Dakota, and a new substation near Belfield to as a means of adding transmission capacity to the area.

72

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

Not Available

1993-12-01T23:59:59.000Z

73

EA-1931: Keeler to Tillamook Transmission Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration prepared this EA to assess the potential environmental impacts of the proposed rebuild of the Keeler-Forest Grove and Forest Grove-Tillamook 115-kilovolt (kV) transmission lines between the cities of Hillsboro and Tillamook, in Washington and Tillamook Counties, Oregon. The 58-mile-long rebuild would include replacement of all wood-pole structures over 10 years in age. Some existing access roads would be improved to accommodate construction equipment and some new road access would be acquired or constructed in areas where access is not available.

74

Quantum LDPC Codes Constructed from Point-Line Subsets of the Finite Projective Plane  

E-Print Network [OSTI]

Due to their fast decoding algorithms, quantum generalizations of low-density parity check, or LDPC, codes have been investigated as a solution to the problem of decoherence in fragile quantum states. However, the additional twisted inner product requirements of quantum stabilizer codes force four-cycles and eliminate the possibility of randomly generated quantum LDPC codes. Moreover, the classes of quantum LDPC codes discovered thus far generally have unknown or small minimum distance, or a fixed rate. This paper presents several new classes of quantum LDPC codes constructed from finite projective planes. These codes have rates that increase with the block length $n$ and minimum weights proportional to $n^{1/2}$.

Jacob Farinholt

2012-07-03T23:59:59.000Z

75

Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming  

SciTech Connect (OSTI)

The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

Not Available

1990-07-01T23:59:59.000Z

76

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect (OSTI)

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

77

SUPERCOMPUTER EDUCATION AND RESEARCH CENTER LIST OF ITEMS FOR DISPOSAL  

E-Print Network [OSTI]

Machine 35. Water Chiller Unit 36. Assorted Circuit Boards 37. Various type of Power Supply 38. Keyboards. Ungermann Bass ­ Network Items 20. Personal Computers (CPU only) #12;21. Laptop/Think Pads 22. Heavy Duty Line Printers 23. Heavy Duty Laser Printers 24. Heavy Duty Colour Laser Printers 25. HP Draft Masters

Govindarajan, Ramaswamy

78

Communicating in a multi-project environment with a single-sheet project plan  

SciTech Connect (OSTI)

In June 1992, the Corporate Construction Program Office was formed to provide single-point accountability for managing all corporate-sponsored construction projects at Sandia, answering to upper Sandia management as well as Sandia`s primary external customer, the U.S. DOE. CCPO had 3 major areas of responsibility: Congressional line-item projects (>$2 million), general plant projects (<$2 million), and corporate-funded major rearrangements (renovations). A single-sheet project plan (``summary sheet``), with monthly updates, was developed for every project. Each month, the sheets are duplicated and placed in a ``project summary book`` that is distributed through various communication channels at Sandia. Despite many modifications, the summary sheet has remained simple and useful to a broad range of project stakeholders. This paper describes how the sheet`s design and implementation enhances communication across Sandia`s complex, multi-program environment.

Furaus, J.P.; Figueroa-McInteer, C.; Glidewell, D.D.; McKeever, P.S.; Hendrick, W.E.; Wisler, D.B.; Zavadil, J.T.

1995-07-01T23:59:59.000Z

79

INL Wind Farm Project Description Document  

SciTech Connect (OSTI)

The INL Wind Farm project proposes to install a 20 MW to 40 MW wind farm on government property, consisting of approximately ten to twenty full-sized (80-meter hub height) towers with 2 MW turbines, and access roads. This includes identifying the optimal turbine locations, building access roads, and pouring the tower foundations in preparation for turbine installation. The project successfully identified a location on INL lands with commercially viable wind resources (i.e., greater than 11 mph sustained winds) for a 20 to 40 MW wind farm. Additionally, the proposed Wind Farm was evaluated against other General Plant Projects, General Purpose Capital Equipment projects, and Line Item Construction Projects at the INL to show the relative importance of the proposed Wind Farm project.

Gary Siefert

2009-07-01T23:59:59.000Z

80

ITEM # 13AA Biomedical Engineering  

E-Print Network [OSTI]

ITEM # 13AA Biomedical Engineering http://ecs.utdallas.edu/BME/ Faculty Professors: John H. L Southwestern and UT Dallas) List joint-assignments here Objectives The Biomedical Engineering Program generation of biomedical engineers will address fundamental scientific questions, provide answers to critical

O'Toole, Alice J.

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Manakin Case Study: visualizing geospatial metadata and complex items  

E-Print Network [OSTI]

:/handle.tamu.edu/1969.1/2490, and has been featured as an Editors Pick on Yahoo.com for its use of the Yahoo! Maps API. This presentation is the third in a set of thre about the Manakin project. This presentation discusses a specific use case of using Manakin...-based interface obvious choice for context Yahoo! Maps chosen for ease of API and aesthethic qualities Geographic coordinates were available for every item Map places every item into a geographic context Allows user to quickly determine coverage area...

Mikeal, Adam; Green, Cody; Maslov, Alexey; Phillips, Scott; Weimer, Kathy; Leggett, John

2007-07-16T23:59:59.000Z

82

www.ianrowland.com > Items To Buy > Diana Deutsch CDs Home Items To Buy  

E-Print Network [OSTI]

www.ianrowland.com > Items To Buy > Diana Deutsch CDs Home Items To Buy Items To Buy > Auditory Illusions CDs by Diana Deutsch published by Philomel Records Actual titles: Musical Illusions and Paradoxes

83

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington  

Broader source: Energy.gov [DOE]

This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOEs Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interiors Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

84

JOBAID-SELF ASSIGNING COURSES (ITEMS)  

Broader source: Energy.gov [DOE]

In this jobaid you will learn to use the Course Catalog, Browse Catalog, Recommended Items, Locate and Self-Assign Items (Courses) Using the Search Catalog features, Narrow Course Searches using...

85

New Item is requested directly by Physician  

E-Print Network [OSTI]

New Item is requested directly by Physician and communicated to Materials Management via email New Item is requested via Special Needs Report and communicated to Materials Management via email New Item is requested via Vendor Rep on behalf of Physician and is communicated to Materials Management via email

Oliver, Douglas L.

86

The Real Meaning of Complex Minkowski-Space World-Lines  

E-Print Network [OSTI]

In connection with the study of shear-free null geodesics in Minkowski space, we investigate the real geometric effects in real Minkowski space that are induced by and associated with complex world-lines in complex Minkowski space. It was already known, in a formal manner, that complex analytic curves in complex Minkowski space induce shear-free null geodesic congruences. Here we look at the direct geometric connections of the complex line and the real structures. Among other items, we show, in particular, how a complex world-line projects into the real Minkowski space in the form of a real shear-free null geodesic congruence.

T. M. Adamo; E. T. Newman

2009-11-21T23:59:59.000Z

87

Item # Item Description Unit Size Supplier # Supplier Name Price Busch Stockroom Product List  

E-Print Network [OSTI]

Item # Item Description Unit Size Supplier # Supplier Name Price Qty On Hand Last Price Update;Item # Item Description Unit Size Supplier # Supplier Name Price Qty On Hand Last Price Update BuschGas 1.00 3,559 03/20/2014 797 Oil Vacuum Pump - 1 Liter S41455 Fisher 9.48 0 03/27/2008 796 Oil Vacuum

Garfunkel, Eric

88

The Use and Benefits of Video Inspection in Lined and Unlined Ductwork in IAQ Surveys and "Source Removal" Cleaning Projects  

E-Print Network [OSTI]

New technology has developed video equipment capable of inspecting interior lined and unlined ductwork. Where IAQ (Indoor Air Quality) questions require inspections of suspicious air conveyance systems. Video recordings provide useful information...

Kiec, T. M.

89

Project Final Report: Building a Community Infrastructure for Scalable On-Line Performance Analysis Tools around Open|SpeedShop  

SciTech Connect (OSTI)

In this project we created a community tool infrastructure for program development tools targeting Petascale class machines and beyond. This includes tools for performance analysis, debugging, and correctness tools, as well as tuning and optimization frameworks. The developed infrastructure provides a comprehensive and extensible set of individual tool building components. We started with the basic elements necessary across all tools in such an infrastructure followed by a set of generic core modules that allow a comprehensive performance analysis at scale. Further, we developed a methodology and workflow that allows others to add or replace modules, to integrate parts into their own tools, or to customize existing solutions. In order to form the core modules, we built on the existing Open|SpeedShop infrastructure and decomposed it into individual modules that match the necessary tool components. At the same time, we addressed the challenges found in performance tools for petascale systems in each module. When assembled, this instantiation of community tool infrastructure provides an enhanced version of Open|SpeedShop, which, while completely different in its architecture, provides scalable performance analysis for petascale applications through a familiar interface. This project also built upon and enhances capabilities and reusability of project partner components as specified in the original project proposal. The overall project teams work over the project funding cycle was focused on several areas of research, which are described in the following sections. The reminder of this report also highlights related work as well as preliminary work that supported the project. In addition to the project partners funded by the Office of Science under this grant, the project team included several collaborators who contribute to the overall design of the envisioned tool infrastructure. In particular, the project team worked closely with the other two DOE NNSA laboratories Los Alamos and Sandia leveraging co-funding for Krell by ASCs Common Computing Environment (CCE) program as laid out in the original proposal. The ASC CCE co-funding, coordinated through LLNL, was for 50% of the total project funding, with the ASC CCE portion of the funding going entirely to Krell, while the ASCR funding itself was split between Krell and the funded partners. This report covers the entire project from both funding sources. Additionally, the team leveraged the expertise of software engineering researchers from Carnegie Mellon University, who specialize in software framework design, in order to achieve a broadly acceptable component framework. The Component Based Tool Framework (CBTF) software has been released to the community. Information related to the project and the released software can be found on the CBTF wiki page at: http://sourceforge.net/p/cbtf/wiki/Home

Galarowicz, James

2014-01-06T23:59:59.000Z

90

EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington  

Broader source: Energy.gov [DOE]

The Bureau of Land Management is preparing, with DOEs Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPAs proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

91

The photospheric solar oxygen project: II. Non-concordance of the oxygen abundance derived from two forbidden lines  

E-Print Network [OSTI]

In the Sun, the two forbidden [OI] lines at 630 and 636 nm were previously found to provide discrepant oxygen abundances. aims: We investigate whether this discrepancy is peculiar to the Sun or whether it is also observed in other stars. method: We make use of high-resolution, high signal-to-noise ratio spectra of four dwarf to turn-off stars, five giant stars, and one sub-giant star observed with THEMIS, HARPS, and UVES to investigate the coherence of the two lines. results: The two lines provide oxygen abundances that are consistent, within observational errors, in all the giant stars examined by us. On the other hand, for the two dwarf stars for which a measurement was possible, for Procyon, and for the sub-giant star Capella, the 636 nm line provides systematically higher oxygen abundances, as already seen for the Sun. conclusions: The only two possible reasons for the discrepancy are a serious error in the oscillator strength of the NiI line blending the 630 nm line or the presence of an unknown blend in...

Caffau, Elisabetta; Malherbe, Jean-M; Bonifacio, Piercarlo; Steffen, Matthias; Monaco, Lorenzo

2013-01-01T23:59:59.000Z

92

Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)  

SciTech Connect (OSTI)

This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the company??s continued success and growth is directly related to our expertise in applying this program to interesting applications.

Muons, Inc.

2011-05-19T23:59:59.000Z

93

EIS-0116: Blue River-Gore Pass Portion of the Hayden-Blue River Transmission Line Project  

Broader source: Energy.gov [DOE]

The U.S. Department of Energys Western Area Power Administration (WAPA) adopted this U.S. Department of Agriculture Rural Electrification Administration so that WAPA could supplement it in support of WAPAs National Environmental Policy Act requirements for a related project.

94

PV Manufacturing R&D Project Status and Accomplishments Under 'In-Line Diagnostics and Intelligent Processing' and 'Yield, Durability and Reliability'  

SciTech Connect (OSTI)

The PV Manufacturing R&D (PVMR&D) Project conducts cost-shared research and development programs with U.S. PV industry partners. There are currently two active industry partnership activities. 'In-line Diagnostics and Intelligent Processing', launched in 2002, supports development of new in-line diagnostics and monitoring with real-time feedback for optimal process control and increased yield in the fabrication of PV modules, systems, and other system components. 'Yield, Durability and Reliability', launched in late 2004, supports enhancement of PV module, system component, and complete system reliability in high-volume manufacturing. A second key undertaking of the PVMR&D Project is the collection and analysis of module production cost-capacity metrics for the U.S. PV industry. In the period from 1992 through 2005, the average module manufacturing cost in 2005 dollars fell 54% (5.7% annualized) to $2.73/Wp, and the capacity increased 18.5-fold (25% annualized) to 251 MW/yr. An experience curve analysis gives progress ratios of 87% and 81%, respectively, for U.S. silicon and thin-film module production.

Friedman, D. J.; Mitchell, R. L.; Keyes, B. M.; Bower, W. I.; King, R.; Mazer, J. A.

2006-01-01T23:59:59.000Z

95

Example Cost Codes for Construction Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

1997-03-28T23:59:59.000Z

96

Design of a demand driven multi-item-multi-stage manufacturing system : production scheduling, WIP control and Kanban implementation  

E-Print Network [OSTI]

The project is conducted in a multi-item-multi-stage manufacturing system with high volume products. The objectives are to optimize the inventory structure and improve production scheduling process. The stock building plan ...

Zhou, Xiaoyu, M. Eng Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

97

Bibliography of Yucca Mountain Project (YMP) publications at Lawrence Livermore National Laboratory, September 1977--March 1997  

SciTech Connect (OSTI)

This report consists of a listing of Lawrence Livermore National Laboratory`s research items on the Yucca Mountain Project.

NONE

1997-03-01T23:59:59.000Z

98

Nuclear Energy Research Initiative Project No. 02 103 Innovative Low Cost Approaches to Automating QA/QC of Fuel Particle Production Using On Line Nondestructive Methods for Higher Reliability Final Project Report  

SciTech Connect (OSTI)

This Nuclear Energy Research Initiative (NERI) project was tasked with exploring, adapting, developing and demonstrating innovative nondestructive test methods to automate nuclear coated particle fuel inspection so as to provide the United States (US) with necessary improved and economical Quality Assurance and Control (QA/QC) that is needed for the fuels for several reactor concepts being proposed for both near term deployment [DOE NE & NERAC, 2001] and Generation IV nuclear systems. Replacing present day QA/QC methods, done manually and in many cases destructively, with higher speed automated nondestructive methods will make fuel production for advanced reactors economically feasible. For successful deployment of next generation reactors that employ particle fuels, or fuels in the form of pebbles based on particles, extremely large numbers of fuel particles will require inspection at throughput rates that do not significantly impact the proposed manufacturing processes. The focus of the project is nondestructive examination (NDE) technologies that can be automated for production speeds and make either: (I) On Process Measurements or (II) In Line Measurements. The inspection technologies selected will enable particle quality qualification as a particle or group of particles passes a sensor. A multiple attribute dependent signature will be measured and used for qualification or process control decisions. A primary task for achieving this objective is to establish standard signatures for both good/acceptable particles and the most problematic types of defects using several nondestructive methods.

Ahmed, Salahuddin; Batishko, Charles R.; Flake, Matthew; Good, Morris S.; Mathews, Royce; Morra, Marino; Panetta, Paul D.; Pardini, Allan F.; Sandness, Gerald A.; Tucker, Brian J.; Weier, Dennis R.; Hockey, Ronald L.; Gray, Joseph N.; Saurwein, John J.; Bond, Leonard J.; Lowden, Richard A.; Miller, James H.

2006-02-28T23:59:59.000Z

99

Number Plastic Type Common Items Number of Items (tally) 1 polyethylene terephthalate  

E-Print Network [OSTI]

End Time: Number Plastic Type Common Items Number of Items (tally) 1 polyethylene terephthalate and vegetable oil containers; ovenable food trays. 2 high density polyethylene Milk jugs, juice bottles; bleach, piping, candy wrappers 4 low density polyethylene Squeezable bottles; bread, frozen food, dry cleaning

Schladow, S. Geoffrey

100

Electric germs Source: scenta Rate this item  

E-Print Network [OSTI]

Electric germs Source: scenta Rate this item People in remote areas could benefit from fuel cells that contain bacteria that grows prolifically on the graphite anodes of fuel cells and can conduct electricity that isolating a bacterium generated pow er in fuel cells efficiently. Geobacter sulfurreducens is bacteria

Lovley, Derek

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

The Impact of the Item Types and Number of Solution Steps of Multiple-Choice Items on Item Difficulty and Discrimination and Test Reliability  

E-Print Network [OSTI]

The Impact of the Item Types and Number of Solution Steps of Multiple-Choice Items on Item Difficulty and Discrimination and Test Reliability By Erkan Hasan Atalmis Submitted to the graduate degree program in the Department of Psychology... ________________________________ Bruce Frey ________________________________ Marianne Perie ________________________________ Argun Saatcioglu ________________________________ William Skorupski Date Defended: 5/5/14 The Dissertation Committee for Erkan Hasan...

Atalmis, Erkan Hasan

2014-08-31T23:59:59.000Z

102

IMPEE PhD Opportunity Project title: LightFoot PhD A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal  

E-Print Network [OSTI]

to simulate this behaviour. This is to provide guidance to overhead line design engineers on lightening Overhead Lines with Non-Ideal Tower Footing Resistance Supervisor(s): Dr Jonathan Swingler j.swingler@hw.ac.uk Abstract LightFoot PhD ­ A PhD Investigation Lightning Protection of HV Overhead Lines with Non-Ideal Tower

Greenaway, Alan

103

AVOID BECOMING A VICTIM OF COUNTERFEIT ITEMS  

SciTech Connect (OSTI)

In today's globalized economy, we cannot live without imported products. Most people do not realize how thin the safety net of regulation and inspection really is. Less than three percent of imported products receive any form of government inspection prior to sale. Avoid flea markets, street vendors and deep discount stores. The sellers of counterfeit wares know where to market their products. They look for individuals who are hungry for a brand name item but do not want to pay a brand name price for it. The internet provides anonymity to the sellers of counterfeit products. Unlike Europe, U.S. law does not hold internet-marketing organizations, responsible for the quality of the products sold on their websites. These organizations will remove an individual vendor when a sufficient number of complaints are lodged, but they will not take responsibility for the counterfeit products you may have purchased. EBay has a number of counterfeit product guides to help you avoid being a victim of the sellers of these products. Ten percent of all medications taken worldwide are counterfeit. If you do buy medications on-line, be sure that the National Association of Boards of Pharmacy Verified Internet Pharmacy Practice Sites (VIPPS) recommends the pharmacy you choose to use. Inspect all medication purchases and report any change in color, shape, imprinting or odor to your pharmacist. If you take generic medications these attributes may change from one manufacturer to another. Your pharmacist should inform you of any changes when you refill your prescription. If they do not, get clarification prior to taking the medication. Please note that the Federal Drug Administration (FDA) does not regulate supplements. The FDA only steps in when a specific supplement proves to cause physical harm or contains a regulated ingredient. Due to counterfeiting, Underwriters Laboratories (UL) changed their label design three times since 1996. The new gold label should be attached to the cord or body of most office and home electrical products (please see the picture to the left). Holiday lights may have the UL marking in red or green instead of the universal black. A red UL mark indicates the product is approved for outdoor as well as indoor service. The green UL mark indicates the product is only to be used indoors. A small number of home electrical products may bear an Interteck (ETL) approval. This label is also acceptable. An Interteck label includes black print on a white background bearing the circular ETL logo. Most manufacturers are proud of their products and strive to gain name recognition as well as foster repeat business. This is not true of counterfeiters. The very first thing most counterfeiters try to do is make their products untraceable. Their products may bear the nation of origin but that is all. This is a common practice with metal components such as pipe fittings and flanges. This is also true of hoisting and rigging equipment such as shackles, turnbuckles and chain. Sadly, this has also occurred with the purchase of some safety equipment such as arc-flash retardant coveralls. Learn the national standards associated with products you are purchasing. Clearly specify these requirements on the procurements you make.

WARRINER RD

2011-07-13T23:59:59.000Z

104

No Evidence for an Item Limit in Change Detection  

E-Print Network [OSTI]

Change detection is a classic paradigm that has been used for decades to argue that working memory can hold no more than a fixed number of items (item-limit models). Recent findings force us to consider the alternative ...

Keshvari, Shaiyan Oliver

105

Guide to good practices for the development of test items  

SciTech Connect (OSTI)

While the methodology used in developing test items can vary significantly, to ensure quality examinations, test items should be developed systematically. Test design and development is discussed in the DOE Guide to Good Practices for Design, Development, and Implementation of Examinations. This guide is intended to be a supplement by providing more detailed guidance on the development of specific test items. This guide addresses the development of written examination test items primarily. However, many of the concepts also apply to oral examinations, both in the classroom and on the job. This guide is intended to be used as guidance for the classroom and laboratory instructor or curriculum developer responsible for the construction of individual test items. This document focuses on written test items, but includes information relative to open-reference (open book) examination test items, as well. These test items have been categorized as short-answer, multiple-choice, or essay. Each test item format is described, examples are provided, and a procedure for development is included. The appendices provide examples for writing test items, a test item development form, and examples of various test item formats.

NONE

1997-01-01T23:59:59.000Z

106

Inventory List Item Number Brief Description Price Preferred Vendor  

E-Print Network [OSTI]

Inventory List UT Austin Item Number Brief Description Price Preferred Vendor L0146 Adapter, Glass w/Screw Top, Amber, 4 dram $0.56 VWRSC 4/21/14 Page - 1 #12;Inventory List UT Austin Item Number;Inventory List UT Austin Item Number Brief Description Price Preferred Vendor S0027 CD, Recordable $0

107

Independent Verification Survey Report for the Offsite Portion of the Potential Release Site-7 Abandoned Sanitary Line, Miamisburg Closure Project, Miamisburg, Ohio  

SciTech Connect (OSTI)

The ORISE objective was to confirm that the remedial action process implemented by the contractor was in accordance with the PRS-7 Work Package. Following removal of the sanitary line, the soil beneath the line would be sampled to determine if remediation was required (ARC 2007a).

P.C. Weaver

2008-08-15T23:59:59.000Z

108

Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado  

SciTech Connect (OSTI)

The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

N /A

2000-03-20T23:59:59.000Z

109

Measuring student learning with item response theory  

E-Print Network [OSTI]

measured in this way will enable the use of IRT to assess students based on their second attempt in a tutoring environment. DOI: 10.1103/PhysRevSTPER.4.010102 PACS number#1;s#2;: 01.40.Fk, 01.40.G#1;, 01.50.ht INTRODUCTION This work stands... first deter- mine the skill of students and the difficulty of items based PHYSICAL REVIEW SPECIAL TOPICS - PHYSICS EDUCATION RESEARCH 4, 010102 #1;2008#2; 1554-9178/2008/4#1;1#2;/010102#1;6#2; 2008 The American Physical Society010102-1 solely...

Lee, Young-Jin; Palazzo, David J.; Warnakulasooriya, Rasil; Pritchard, David E.

2008-01-01T23:59:59.000Z

110

SciTech Connect: Item Not Found  

Office of Scientific and Technical Information (OSTI)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinan antagonist Journal Article:Biasi, A.long baseline neutrino experiment" Find +SearchUs UnderstandItem

111

SciTech Connect: Item Not Found  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBi (2) Sr (2) Ca (2) Cu (3)GettingGeochemicalInvestigating anItem

112

SciTech Connect: Item Not Found  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administrationcontroller systemsBi (2) Sr (2) Ca (2) Cu (3)GettingGeochemicalInvestigatingItem Not

113

Suspect/Counterfeit Item Awareness Training Manual  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy Strain Rate4SuperhardSuspect and Counterfeit Items Memo

114

Feed mechanism and method for feeding minute items  

DOE Patents [OSTI]

A feeding mechanism and method for feeding minute items, such as capacitors, resistors, or solder preforms. The mechanism is adapted to receive a plurality of the randomly-positioned and randomly-oriented extremely small or minute items, and to isolate, orient, and position the items in a specific repeatable pickup location wherefrom they may be removed for use by, for example, a computer-controlled automated assembly machine. The mechanism comprises a sliding shelf adapted to receive and support the items; a wiper arm adapted to achieve a single even layer of the items; and a pushing arm adapted to push the items into the pickup location. The mechanism can be adapted for providing the items with a more exact orientation, and can also be adapted for use in a liquid environment.

Stringer, Timothy Kent; Yerganian, Simon Scott

2012-11-06T23:59:59.000Z

115

Feed mechanism and method for feeding minute items  

DOE Patents [OSTI]

A feeding mechanism and method for feeding minute items, such as capacitors, resistors, or solder preforms. The mechanism is adapted to receive a plurality of the randomly-positioned and randomly-oriented extremely small or minute items, and to isolate, orient, and position one or more of the items in a specific repeatable pickup location wherefrom they may be removed for use by, for example, a computer-controlled automated assembly machine. The mechanism comprises a sliding shelf adapted to receive and support the items; a wiper arm adapted to achieve a single even layer of the items; and a pushing arm adapted to push the items into the pickup location. The mechanism can be adapted for providing the items with a more exact orientation, and can also be adapted for use in a liquid environment.

Stringer, Timothy Kent (Bucyrus, KS); Yerganian, Simon Scott (Lee's Summit, MO)

2009-10-20T23:59:59.000Z

116

EA-1617: Lovell-Yellowtail and Basin-Lovell Transmission Line Rebuild Project, Big Horn County, Wyoming, and Big Horn and Carbon Counties, Montana  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration prepared this EA and a finding of no significant impact for a proposal to rebuild the Lovell-Yellowtail (LV-YT) No. 1 and No. 2 115-kV transmission lines, located in Big Horn County, Wyoming, and Big Horn and Carbon Counties in Montana, and the Basin-Lovell 115-kV transmission line in Big Horn County, Wyoming.

117

CLEAR LAKE BASIN 2000 PROJECT  

SciTech Connect (OSTI)

The following is a final report for the Clear Lake Basin 2000 project. All of the major project construction work was complete and this phase generally included final details and testing. Most of the work was electrical. Erosion control activities were underway to prepare for the rainy season. System testing including pump stations, electrical and computer control systems was conducted. Most of the project focus from November onward was completing punch list items.

LAKE COUNTY SANITATION DISTRICT

2003-03-31T23:59:59.000Z

118

Binary classification of items of interest in a repeatable process  

DOE Patents [OSTI]

A system includes host and learning machines in electrical communication with sensors positioned with respect to an item of interest, e.g., a weld, and memory. The host executes instructions from memory to predict a binary quality status of the item. The learning machine receives signals from the sensor(s), identifies candidate features, and extracts features from the candidates that are more predictive of the binary quality status relative to other candidate features. The learning machine maps the extracted features to a dimensional space that includes most of the items from a passing binary class and excludes all or most of the items from a failing binary class. The host also compares the received signals for a subsequent item of interest to the dimensional space to thereby predict, in real time, the binary quality status of the subsequent item of interest.

Abell, Jeffrey A.; Spicer, John Patrick; Wincek, Michael Anthony; Wang, Hui; Chakraborty, Debejyo

2014-06-24T23:59:59.000Z

119

The ATLAS 3D project - XVI. Physical parameters and spectral line energy distributions of the molecular gas in gas-rich early-type galaxies  

E-Print Network [OSTI]

[Abridged] We present a detailed study of the physical properties of the molecular gas in a sample of 18 molecular gas-rich early-type galaxies (ETGs) from the ATLAS$ 3D sample. Our goal is to better understand the star formation processes occurring in those galaxies, starting here with the dense star-forming gas. We use existing integrated $^{12}$CO(1-0, 2-1), $^{13}$CO(1-0, 2-1), HCN(1-0) and HCO$^{+}$(1-0) observations and present new $^{12}$CO(3-2) single-dish data. From these, we derive for the first time the average kinetic temperature, H$_{2}$ volume density and column density of the emitting gas, this using a non-LTE theoretical model. Since the CO lines trace different physical conditions than of those the HCN and HCO$^{+}$ lines, the two sets of lines are treated separately. We also compare for the first time the predicted CO spectral line energy distributions (SLEDs) and gas properties of our molecular gas-rich ETGs with those of a sample of nearby well-studied disc galaxies. The gas excitation con...

Bayet, Estelle; Davis, Timothy A; Young, Lisa M; Crocker, Alison F; Alatalo, Katherine; Blitz, Leo; Bois, Maxime; Bournaud, Frdric; Cappellari, Michele; Davies, Roger L; de Zeeuw, P T; Duc, Pierre-Alain; Emsellem, Eric; Khochfar, Sadegh; Krajnovi?, Davor; Kuntschner, Harald; McDermid, Richard M; Morganti, Raffaella; Naab, Thorsten; Oosterloo, Tom; Sarzi, Marc; Scott, Nicholas; Serra, Paolo; Weijmans, Anne-Marie

2012-01-01T23:59:59.000Z

120

Safety Evaluation for Packaging (onsite) T Plant Canyon Items  

SciTech Connect (OSTI)

This safety evaluation for packaging (SEP) evaluates and documents the ability to safely ship mostly unique inventories of miscellaneous T Plant canyon waste items (T-P Items) encountered during the canyon deck clean off campaign. In addition, this SEP addresses contaminated items and material that may be shipped in a strong tight package (STP). The shipments meet the criteria for onsite shipments as specified by Fluor Hanford in HNF-PRO-154, Responsibilities and Procedures for all Hazardous Material Shipments.

OBRIEN, J.H.

2000-07-14T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Suspect Counterfeit Items Criteria Review and Approach Document...  

Broader source: Energy.gov (indexed) [DOE]

SuspectCounterfeit Items Criteria Review and Approach Document (CRAD) NNSANevada Site Office Facility Representative Division Phase 1 - Management Performance Objective:...

122

A User's Guide To BRILLIANT! TEST SCORING AND ITEM ANALYSIS  

E-Print Network [OSTI]

A User's Guide To BRILLIANT! TEST SCORING AND ITEM ANALYSIS August, 2008 Program Brilliant!: Test ....................................................................................................2 Test Scoring Enhancements.............................................................................................................................................................2 Scoring different test forms

123

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect (OSTI)

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

124

Inventory List Item Number Brief Description Price Preferred Vendor  

E-Print Network [OSTI]

Inventory List UT Austin Item Number Brief Description Price Preferred Vendor E0060 1 kb DNA Ladder0042 Taq DNA Polymerase - 2,000 units $224.48 NEWEN 4/21/14 Page - 1 #12;Inventory List UT Austin Item

125

Inventory List Item Number Brief Description Price Preferred Vendor  

E-Print Network [OSTI]

Inventory List UT Austin Item Number Brief Description Price Preferred Vendor Y0044 #BL21 STAR DE3.44 LIFET Y0041 Purelink Genomic DNA (50) $90.39 LIFET 4/21/14 Page - 1 #12;Inventory List UT Austin Item

126

Item Weighting Techniques for Collaborative Linas Baltrunas and Francesco Ricci  

E-Print Network [OSTI]

of an item for predicting the rating of another item and it is computed as a correlation coefficient between-Bolzano Domeninkanerplatz 3, Bozen, Italy e-mail: {lbaltrunas,fricci}@unibz.it B. Berendt et al. (Eds.): Knowl. Disc. Enhan

Ricci, Francesco

127

A Suggested Format for Preparing a Thesis/Project Proposal  

E-Print Network [OSTI]

completion of the thesis/project and graduation of the student. The proposal should address the items's graduation plans? For any further guidance in this regard, the student must contact his/her Thesis/ProjectA Suggested Format for Preparing a Thesis/Project Proposal A thesis/project proposal must

Ravikumar, B.

128

Uranium Mill Tailings Remedial Action Project Environmental Line Management Audit Action Plan. Final report. Audit, October 26, 1992--November 6, 1992  

SciTech Connect (OSTI)

This Action Plan contains responses, planned actions, and estimated costs for addressing the findings discovered in the Environmental Management Audit conducted for the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRA), October 26 through November 6, 1992. This document should be read in conjunction with the Audit Report to ensure the findings addressed in this document are fully understood. The scope of the UMTRA Environmental Management Audit was comprehensive and encompassed all areas of environmental management except environmental programs pertaining to the National Environmental Policy Act (NEPA) compliance. The Audit Report listed 18 findings: 11 were identified as compliance findings, and the remaining 7 were best management practice findings. Root cause analysis was performed on all the findings. The results of the analysis as well as planned corrective actions are summarized in Section 5.0. All planned actions were prioritized using the Tiger Team Assessment Corrective Action Plan system. Based on assigned priorities, all planned actions were costed by fiscal year. This Action Plan contains a description of the organizational and management structures to be used to implement the Action Plan, a brief discussion of root cause analysis and funding, followed by the responses and planned actions for each finding. A member of the UMTRA Project Office (PO) has been assigned responsibility for tracking the progress on each of the findings. The UMTRA PO staff wrote and/or approved all of the corrective actions recorded in this Action Plan.

NONE

1993-07-01T23:59:59.000Z

129

Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management  

SciTech Connect (OSTI)

The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

NONE

1995-07-14T23:59:59.000Z

130

Project Year Project Title  

E-Print Network [OSTI]

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

131

Project Year Project Team  

E-Print Network [OSTI]

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

132

Project Year Project Team  

E-Print Network [OSTI]

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

133

Identification of items and activities important to waste form acceptance by Westinghouse GoCo sites  

SciTech Connect (OSTI)

The Department of Energy has established specifications (Waste Acceptance Product Specifications for Vitrified High-Level Waste Forms, or WAPS) for canistered waste forms produced at Hanford, Savannah River, and West Valley. Compliance with these specifications requires that each waste form producer identify the items and activities which must be controlled to ensure compliance. As part of quality assurance oversight activities, reviewers have tried to compare the methodologies used by the waste form producers to identify items and activities important to waste form acceptance. Due to the lack of a documented comparison of the methods used by each producer, confusion has resulted over whether the methods being used are consistent. This confusion has been exacerbated by different systems of nomenclature used by each producer, and the different stages of development of each project. The waste form producers have met three times in the last two years, most recently on June 28, 1993, to exchange information on each producer`s program. These meetings have been sponsored by the Westinghouse GoCo HLW Vitrification Committee. This document is the result of this most recent exchange. It fills the need for a documented comparison of the methodologies used to identify items and activities important to waste form acceptance. In this document, the methodology being used by each waste form producer is summarized, and the degree of consistency among the waste form producers is determined.

Plodinec, M.J.; Marra, S.L. [Westinghouse Savannah River Co., Aiken, SC (United States); Dempster, J. [West Valley Demonstration Project, NY (United States); Randklev, E.H. [Hanford Waste Vitrification Plant (United States)

1993-10-12T23:59:59.000Z

134

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

135

Use of Optical and Imaging Techniques for Inspection of Off-Line Joule-Heated Melter at the West Valley Demonstration Project  

SciTech Connect (OSTI)

The West Valley melter has been taken out of service. Its design is the direct ancestor of the current melter design for the Hanford Waste Treatment Plant. Over its eight years of service, the West Valley melter has endured many of the same challenges that the Hanford melter will encounter with feeds that are similar to many of the Hanford double shell tank wastes. Thus, inspection of the West Valley melter prior to its disposal could provide valuable--even crucial--information to the designers of the melters to be used at the Hanford Site, particularly if quantitative information can be obtained. The objective of Mississippi State University's Diagnostic Instrumentation and Analysis Laboratory's (DIAL) efforts is to develop, fabricate, and deploy inspection tools for the West Valley melter that will (i) be remotely operable in the West Valley process cell; (ii) provide quantitative information on melter refractory wear and deposits on the refractory; and (iii) indicate areas of heterogeneity (e.g., deposits) requiring more detailed characterization. A collaborative arrangement has been established with the West Valley Demonstration Project (WVDP) to inspect their melter.

Plodinec, M. J.; Jang, P-R; Long, Z.; Monts, D. L.; Philip, T.; Su, Y.

2003-02-25T23:59:59.000Z

136

Multi-item memory in the primate prefrontal cortex  

E-Print Network [OSTI]

The ability to retain multiple items in short-term memory is fundamental for cognition, yet almost nothing is known about its neural basis. To explore the mechanisms underlying this ability, we trained two monkeys to ...

Warden, Melissa R. (Melissa Rhoads)

2006-01-01T23:59:59.000Z

137

Instruction Guide Saving and Retrieving Items from My Favorites  

E-Print Network [OSTI]

. For further assistance, e-mail myufmarket@ufl.edu or contact Purchasing Services Help Desk at 392 to find items to add to the Favorites page, we will utilize the product search tool. 2. Click the add

Pilyugin, Sergei S.

138

How to locate and remove large email items from ANUmail  

E-Print Network [OSTI]

the attachment and then select Save Note: Please ensure you copy the files to your personal storage devices (eg This document is designed to assist students to determine large email items, save them in their personal storage

139

http://edocsrpts.doe.gov:80/edocsreports/SingleItem.rpt | Department...  

Broader source: Energy.gov (indexed) [DOE]

http:edocsrpts.doe.gov:80edocsreportsSingleItem.rpt http:edocsrpts.doe.gov:80edocsreportsSingleItem.rpt http:edocsrpts.doe.gov:80edocsreportsSingleItem.rpt More...

140

The Bottom Line Space@Penn Upgrade  

E-Print Network [OSTI]

The Bottom Line Space@Penn Upgrade Coming Soon! A project is underway to upgrade the current that allows designated users in the field to update certain elements of their space. This project, whose: Grants & Projects ­ Used for invoice generation, overhead and revenue recognition, and award and project

Sharp, Kim

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Navajo Electrification Demonstraiton Project  

SciTech Connect (OSTI)

This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

Larry Ahasteen, Project Manager

2006-07-17T23:59:59.000Z

142

ASSESSMENT OF THE IPR ALGORITHM FOR THE DIFFERENTIAL FUNCTIONING OF ITEMS AND TESTS FRAMEWORK.  

E-Print Network [OSTI]

??The Diferential Functioning of Items and Tests (DFIT) framework is a widely used test of di erential functioning. DFIT uses the Item Parameter Replication (IPR) (more)

NEUHENGEN, JONAS M.

2014-01-01T23:59:59.000Z

143

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

144

Project Year Project Title  

E-Print Network [OSTI]

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

145

Project Year Project Team  

E-Print Network [OSTI]

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

146

Suspect/Counterfeit Items Information Guide for Subcontractors/Suppliers  

SciTech Connect (OSTI)

Counterfeiting of industrial and commercial grade items is an international problem that places worker safety, program objectives, expensive equipment, and security at risk. In order to prevent the introduction of Suspect/Counterfeit Items (S/CI), this information sheet is being made available as a guide to assist in the implementation of S/CI awareness and controls, in conjunction with subcontractor's/supplier's quality assurance programs. When it comes to counterfeit goods, including industrial materials, items, and equipment, no market is immune. Some manufactures have been known to misrepresent their products and intentionally use inferior materials and processes to manufacture substandard items, whose properties can significantly cart from established standards and specifications. These substandard items termed by the Department of Energy (DOE) as S/CI, pose immediate and potential threats to the safety of DOE and contractor workers, the public, and the environment. Failure of certain systems and processes caused by an S/CI could also have national security implications at Los Alamos National Laboratory (LANL). Nuclear Safety Rules (federal Laws), DOE Orders, and other regulations set forth requirements for DOE contractors to implement effective controls to assure that items and services meet specified requirements. This includes techniques to implement and thereby minimizing the potential threat of entry of S/CI to LANL. As a qualified supplier of goods or services to the LANL, your company will be required to establish and maintain effective controls to prevent the introduction of S/CI to LANL. This will require that your company warrant that all items (including their subassemblies, components, and parts) sold to LANL are genuine (i.e. not counterfeit), new, and unused, and conform to the requirements of the LANL purchase orders/contracts unless otherwise approved in writing to the Los Alamos National Security (LANS) contract administrator/procurements specialist.

Tessmar, Nancy D. [Los Alamos National Laboratory; Salazar, Michael J. [Los Alamos National Laboratory

2012-09-18T23:59:59.000Z

147

Proposed Project: Plains & Eastern Clean Line Transmission Line |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | Department ofThatGrid3 ProgramIDPromotingNo.

148

Project W-314 specific test and evaluation plan for AZ tank farm upgrades  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-631 transfer line from the AZ-O1A pit to the AZ-02A pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation P1 an (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities, etc), Factory Tests and Inspections (FTIs), installation tests and inspections, Construction Tests and Inspections (CTIs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-08-12T23:59:59.000Z

149

Electric Transmission Line Flashover Prediction System  

E-Print Network [OSTI]

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

150

The 1992 Pacific Northwest Residential Energy Survey : Phase 1 : Book 3 : Item-by-item Crosstabulations.  

SciTech Connect (OSTI)

This book constitutes a portion of the primary documentation for the 1992 Pacific Northwest Residential Energy Survey, Phase I. The complete 33-volume set of primary documentation provides information needed by energy analysts and interpreters with respect to planning, execution, data collection, and data management of the PNWRES92-I process. Thirty of these volumes are devoted to different ``views`` of the data themselves, with each view having a special purpose or interest as its focus. Analyses and interpretations of these data will be the subjects of forthcoming publications. Conducted during the late summer and fall months of 1992, PNWRES92-I had the over-arching goal of satisfying basic requirements for a variety of information about the stock of residential units in Bonneville`s service region. Surveys with a similar goal were conducted in 1979 and 1983. This volume discerns the information by the particular Bonneville Area Office. ``Selected crosstabulations`` refers to a set of nine survey items of wide interest (Dwelling Type, Ownership Type, Year-of-Construction, Dwelling Size, Primary Space-Heating Fuel, Primary Water-Heating Fuel, Household Income for 1991, Utility Type, and Space-Heating Fuels: Systems and Equipment) that were crosstabulated among themselves.

United States. Bonneville Power Administration. End-Use Research Section; Applied Management & Planning Group (Firm)

1993-06-01T23:59:59.000Z

151

Diffusion-Confusion based Light-weight Security for Item-RFID Tag-Reader Communication  

E-Print Network [OSTI]

privacy while carrying tagged items. Keywords: RFID, Tag-Reader communication security, Light item recall etc. As a result, very soon we can expect to see RFID tagged consumer items at manyDiffusion-Confusion based Light-weight Security for Item-RFID Tag-Reader Communication DIVYAN M

Kim, Kwangjo

152

The Hierarchical Rater Model for Rated Test Items and its Application to Large-Scale Educational  

E-Print Network [OSTI]

items have become a standard part of the educational assessment landscape. Some achieve- ment targets

Junker, Brian

153

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

154

Project Proposal Project Logistics  

E-Print Network [OSTI]

Project Proposal · Project Logistics: ­ 2-3 person teams ­ Significant implementation, worth 55 and anticipated cost of copying to/from host memory. IV. Intellectual Challenges - Generally, what makes this computation worthy of a project? - Point to any difficulties you anticipate at present in achieving high

Hall, Mary W.

155

Project Year Project Title  

E-Print Network [OSTI]

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

156

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

157

Project Year Project Team  

E-Print Network [OSTI]

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

158

Method of data mining including determining multidimensional coordinates of each item using a predetermined scalar similarity value for each item pair  

DOE Patents [OSTI]

A method of data mining represents related items in a multidimensional space. Distance between items in the multidimensional space corresponds to the extent of relationship between the items. The user can select portions of the space to perceive. The user also can interact with and control the communication of the space, focusing attention on aspects of the space of most interest. The multidimensional spatial representation allows more ready comprehension of the structure of the relationships among the items.

Meyers, Charles E. (Albuquerque, NM); Davidson, George S. (Albuquerque, NM); Johnson, David K. (Albuquerque, NM); Hendrickson, Bruce A. (Albuquerque, NM); Wylie, Brian N. (Albuquerque, NM)

1999-01-01T23:59:59.000Z

159

Assessing Invariance of Factor Structures and Polytomous Item Response Model Parameter Estimates  

E-Print Network [OSTI]

.e., identical items, different people) for the homogenous graded response model (Samejima, 1969) and the partial credit model (Masters, 1982)? To evaluate measurement invariance using IRT methods, the item discrimination and item difficulty parameters... obtained from the GRM need to be equivalent across datasets. The YFCY02 and YFCY03 GRM item discrimination parameters (slope) correlation was 0.828. The YFCY02 and YFCY03 GRM item difficulty parameters (location) correlation was 0...

Reyes, Jennifer McGee

2012-02-14T23:59:59.000Z

160

Williston to Stateline Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun DengWISP SignInWhoWilliston to Stateline

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Grand Coulee Transmission Line Replacement Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun with Big Sky LearningGet AssistanceCatalytic SitesEmployee,Energy

162

Big Bend-Witten Transmission Line Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareers Apply for a JobBernardtheBeyond(PrincetonBiddingBang or

163

Line Rebuild, Relocation and Substation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocsCenterCenter (LMI-EFRC) -PrinciplesLeeLindadefault

164

DOE Hosts Festival to Collect Items for Area Food Banks  

Broader source: Energy.gov [DOE]

WASHINGTON, D.C. Deputy Secretary of Energy Daniel Poneman and a representative of the Capital Area Food Bank are among the guest speakers at an event this Tuesday, July 31, to collect food items for the DOE Feeds Families drive.

165

List of OTC Products (Items subject to change without notice)  

E-Print Network [OSTI]

List of OTC Products (Items subject to change without notice) Allergy/Cough/Cold/Flu Symptoms * Requires Valid ID for purchase/18 yo Cough Drops Cherry 30ct Cold Eeze tablets 18ct Allergy Tablets 24ct Loratidine D* 10ct Comtrex Cold and Cough* Daytime* Softgels 12 & 20ct Nighttime* Softgels 12ct Banophen Tabs

Stuart, Steven J.

166

Project Year Project Title  

E-Print Network [OSTI]

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve-specialized, but practically useless skill. Solution One goal of this summer's Applied Geographic Information Systems in Public lessons about observational epidemiology. Technologies Used Geographic Info System (GIS), Blackboard

Gray, Jeffrey J.

167

Project Accounts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions...

168

SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure...  

Broader source: Energy.gov (indexed) [DOE]

SunLine Test Drives Hydrogen Bus: Hydrogen Fuel Cell & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects Fact Sheet. SunLine Test Drives Hydrogen Bus:...

169

Suspect/Counterfeit Items Awareness Training Manual | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestoration at YoungSuspect and Counterfeit Items Memo Suspect

170

GEOLOGY, January 2007 1 GSA Data Repository item 2007010, Figures  

E-Print Network [OSTI]

GEOLOGY, January 2007 1 1 GSA Data Repository item 2007010, Figures DR1A (photo of speleothem PP1 and methods for uranium-series chronology), and DR2, (18 O and 13 C data), is available online at www 9140, Boulder, CO 80301, USA. Geology, January 2007; v. 35; no. 1; p.1­4; doi: 10.1130/G22865A.1; 3

Massachusetts at Amherst, University of

171

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect (OSTI)

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

Not Available

1992-04-01T23:59:59.000Z

172

TransWest Express Transmission Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing Colorado and...

173

Item No. 3 process facilities cost estimates and schedules for facilities capability assurance program nuclear facilities modernization - FY 1989 line item, authorization No. D79  

SciTech Connect (OSTI)

Data is presented concerning cost estimates and schedules for process facilities and nuclear facilities modernization.

NONE

1989-07-01T23:59:59.000Z

174

ESPC Project Post-Award Meeting Agenda Items | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement ||MoreThisDepartmentDraftprovidesTheoffers

175

FY 2015 OFFICE OF BUDGET & FINANCE STRATEGIC PLAN Strategic Plan Items & Projects  

E-Print Network [OSTI]

Reports Uniform Guidance Review Spreadsheet Journal process improvements Three New Quality Assurance Balance Reporting Combination Editing Rule Review Budget Deficit Summer Workshop 3.3.1.3. Payroll Work

O'Toole, Alice J.

176

Productivity Improvement of a Manual Assembly Line  

E-Print Network [OSTI]

The current project addresses the productivity improvement of a manual assembly line by making use of operations analysis in the framework of Lean production. A methodology is proposed that helps to improve the productivity of any production process...

Yerasi, Pranavi

2012-10-19T23:59:59.000Z

177

Exploration and project management Sylvain Lenfle  

E-Print Network [OSTI]

to manage innovation. We argue that, in line with the work on project classification, a distinction should1 Exploration and project management Sylvain Lenfle University of Cergy-Pontoise Management of Project Management, Vol. 6, n°5, p. 469-478, July. Abstract Project management in academic studies tends

Paris-Sud XI, Université de

178

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: Construction Project Team: Project Facts & Figures: Budget: £500,000 Funding Source: Capital Construction Project Programme: Start on Site: October 2010 End Date : April 2011 Occupation Date: n/a For further information contact Project Manager as listed above or the Imperial College

179

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: This project refurbished half of the 5th and 7th floors on the Faculty of Medicine, please visit: http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £3,500,000 Funding Source: SRIF III Construction Project Programme: Start

180

Evaluation of PFP Furnace Systems for Thermal Stabilization of Washed High Chloride Plutonium Oxide Items  

SciTech Connect (OSTI)

High chloride content plutonium (HCP) oxides are impure plutonium oxide scrap which contains NaCl, KCl, MgCl2 and/or CaCl2 salts at potentially high concentrations and must be stabilized at 950 C per the DOE Standard, DOE-STD-3013-2000. The chlorides pose challenges to stabilization because volatile chloride salts and decomposition products can corrode furnace heating elements and downstream ventilation components. A high-temperature furnace (same make and model as used at the RMC at Plutonium Finishing Plant) and the associated offgas system were set up at PNNL to identify system vulnerabilities and to investigate alternative materials and operating conditions that would mitigate any corrosion and plugging of furnace and offgas components. The key areas of interest for this testing were the furnace heating elements, the offgas line located inside the furnace, the offgas line between the furnace and the filter/knockout pot, the filter/knockout pot, the sample boat, and corrosion coupons to evaluate alternative materials of construction. The evaluation was conducted by charging the furnace with CeO2 that had been impregnated with a mixture of chloride salts (selected to represent the expected residual chloride salt level in washed high chloride items) and heated in the furnace in accordance with the temperature ramp rates and hold times used at PFP.

Fischer, Christopher M.; Elmore, Monte R.; Schmidt, Andrew J.; Gerber, Mark A.; Muzatko, Danielle S.; Gano, Susan R.; Thornton, Brenda M.

2002-12-17T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

High voltage overhead long transmission line design and fault analysis.  

E-Print Network [OSTI]

??The goal of this project is to design a reliable high voltage overhead long transmission line that satisfies specific design criteria including voltage regulation, efficiency, (more)

Elzain, Mohamed Ali

2011-01-01T23:59:59.000Z

182

Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site  

SciTech Connect (OSTI)

The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at the Savannah River Site. Our review disclosed that the Department had procured and installed safety-class and safety-significant SSCs that did not meet NQA-1 quality standards. Specifically, we identified multiple instances in which critical components did not meet required quality and safety standards. For example: (1) Three structural components were procured and installed by the prime contractor at Savannah River during construction of the MOX Facility that did not meet the technical specifications for items relied on for safety. These substandard items necessitated costly and time consuming remedial action to, among other things, ensure that nonconforming materials and equipment would function within safety margins; (2) In six instances, items used in the construction of TEF failed to satisfy quality standards. In one of these situations, operating procedures had to be modified to ensure that the problem item did not compromise safety; and (3) Finally, at the ISP, one component that did not meet quality standards was procured. The failure of the item could have resulted in a spill of up to 15,000 gallons of high-level radioactive waste. Based on an extensive examination of relevant internal controls and procurement practices, we concluded that these failures were attributable to inadequate attention to quality assurance at Savannah River. Simply put, Departmental controls were not adequate to prevent and/or detect quality assurance problems. For example, Federal and prime contractor officials did not expressly require that subcontractors or lower-tiered vendors comply with quality assurance requirements. Additionally, management did not effectively communicate quality assurance concerns between the several Departmental program elements operating at Savannah River. The procurement and installation of these nonconforming components resulted in cost increases. For example, as of October 2008, the MOX Facility had incurred costs of more than $680,000 due to problems associated with the procurement of $11 million of nonconforming safety-class reinforcing steel.

None

2009-04-01T23:59:59.000Z

183

Suspect and Counterfeit Items Memo | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy Strain Rate4SuperhardSuspect and Counterfeit Items Memo Suspect

184

results and benefits... The Bittern Line Carbon  

E-Print Network [OSTI]

results and benefits... The Bittern Line Carbon Neutral Stations Transport Regeneration Ltd. June 2008 c a s e s t u d yCRed carbon reduction Project Summary Our client, Transport Regeneration Ltd., aims to make nine stations on the Bittern Line between Norwich and Sheringham carbon neutral

Everest, Graham R

185

Method of locating related items in a geometric space for data mining  

DOE Patents [OSTI]

A method for locating related items in a geometric space transforms relationships among items to geometric locations. The method locates items in the geometric space so that the distance between items corresponds to the degree of relatedness. The method facilitates communication of the structure of the relationships among the items. The method is especially beneficial for communicating databases with many items, and with non-regular relationship patterns. Examples of such databases include databases containing items such as scientific papers or patents, related by citations or keywords. A computer system adapted for practice of the present invention can include a processor, a storage subsystem, a display device, and computer software to direct the location and display of the entities. The method comprises assigning numeric values as a measure of similarity between each pairing of items. A matrix is constructed, based on the numeric values. The eigenvectors and eigenvalues of the matrix are determined. Each item is located in the geometric space at coordinates determined from the eigenvectors and eigenvalues. Proper construction of the matrix and proper determination of coordinates from eigenvectors can ensure that distance between items in the geometric space is representative of the numeric value measure of the items' similarity.

Hendrickson, Bruce A. (Albuquerque, NM)

1999-01-01T23:59:59.000Z

186

Method of locating related items in a geometric space for data mining  

DOE Patents [OSTI]

A method for locating related items in a geometric space transforms relationships among items to geometric locations. The method locates items in the geometric space so that the distance between items corresponds to the degree of relatedness. The method facilitates communication of the structure of the relationships among the items. The method is especially beneficial for communicating databases with many items, and with non-regular relationship patterns. Examples of such databases include databases containing items such as scientific papers or patents, related by citations or keywords. A computer system adapted for practice of the present invention can include a processor, a storage subsystem, a display device, and computer software to direct the location and display of the entities. The method comprises assigning numeric values as a measure of similarity between each pairing of items. A matrix is constructed, based on the numeric values. The eigenvectors and eigenvalues of the matrix are determined. Each item is located in the geometric space at coordinates determined from the eigenvectors and eigenvalues. Proper construction of the matrix and proper determination of coordinates from eigenvectors can ensure that distance between items in the geometric space is representative of the numeric value measure of the items' similarity. 12 figs.

Hendrickson, B.A.

1999-07-27T23:59:59.000Z

187

Project Management Project Managment  

E-Print Network [OSTI]

­ Inspired by agile methods #12;Background · Large-scale software development & IT projects, plagued relations #12;One Agile Approach to Scheduling · The creative nature of game development resist heavy up Problems ­incompatible platforms, 3rd party etc. #12;Is Games Development Similar? · Yes & No

Stephenson, Ben

188

Project Year Project Team  

E-Print Network [OSTI]

An Engineer's Guide to the Structures of Baltimore Audience Students from the Krieger School of Arts City, interfaced through a course website, the team will integrate descriptions of structural behavior format. Technologies Used HTML/Web Design, MySQL Project Abstract Structural analysis is typically taught

Gray, Jeffrey J.

189

Control of Suspect/Counterfeit and Defective Items  

SciTech Connect (OSTI)

This procedure implements portions of the requirements of MSC-MP-599, Quality Assurance Program Description. It establishes the Mission Support Alliance (MSA) practices for minimizing the introduction of and identifying, documenting, dispositioning, reporting, controlling, and disposing of suspect/counterfeit and defective items (S/CIs). employees whose work scope relates to Safety Systems (i.e., Safety Class [SC] or Safety Significant [SS] items), non-safety systems and other applications (i.e., General Service [GS]) where engineering has determined that their use could result in a potential safety hazard. MSA implements an effective Quality Assurance (QA) Program providing a comprehensive network of controls and verification providing defense-in-depth by preventing the introduction of S/CIs through the design, procurement, construction, operation, maintenance, and modification of processes. This procedure focuses on those safety systems, and other systems, including critical load paths of lifting equipment, where the introduction of S/CIs would have the greatest potential for creating unsafe conditions.

Sheriff, Marnelle L.

2013-09-03T23:59:59.000Z

190

Apparatus and method for identification and recognition of an item with ultrasonic patterns from item subsurface micro-features  

DOE Patents [OSTI]

The present invention is a means and method for identification and recognition of an item by ultrasonic imaging of material microfeatures and/or macrofeatures within the bulk volume of a material. The invention is based upon ultrasonic interrogation and imaging of material microfeatures within the body of material by accepting only reflected ultrasonic energy from a preselected plane or volume within the material. An initial interrogation produces an identification reference. Subsequent new scans are statistically compared to the identification reference for making a match/non-match decision.

Perkins, Richard W. (Richland, WA); Fuller, James L. (Richland, WA); Doctor, Steven R. (Richland, WA); Good, Morris S. (Richland, WA); Heasler, Patrick G. (Richland, WA); Skorpik, James R. (Kennewick, WA); Hansen, Norman H. (Kennewick, WA)

1995-01-01T23:59:59.000Z

191

Apparatus and method for identification and recognition of an item with ultrasonic patterns from item subsurface micro-features  

DOE Patents [OSTI]

The present invention is a means and method for identification and recognition of an item by ultrasonic imaging of material microfeatures and/or macrofeatures within the bulk volume of a material. The invention is based upon ultrasonic interrogation and imaging of material microfeatures within the body of material by accepting only reflected ultrasonic energy from a preselected plane or volume within the material. An initial interrogation produces an identification reference. Subsequent new scans are statistically compared to the identification reference for making a match/non-match decision. 15 figs.

Perkins, R.W.; Fuller, J.L.; Doctor, S.R.; Good, M.S.; Heasler, P.G.; Skorpik, J.R.; Hansen, N.H.

1995-09-26T23:59:59.000Z

192

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: A state of the art facility, at Hammersmith information visit the Faculty of Medicine web pages http://www1.imperial.ac.uk/medicine/ Construction Project Team: Project Facts & Figures: Budget: £60 000 000 Funding Source: SRIF II (Imperial College), GSK, MRC

193

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The refurbishment of the instrumentation equipment. This project encompasses refurbishment work on over 1,150m2 of laboratory space across four, the completed project will allow researchers to expand their work in satellite instrumentation, the fabrication

194

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Project Fact Sheet Project Brief: In the first phase of the Union Building re.union.ic.ac.uk/marketing/building Construction Project Team: Project Facts & Figures: Budget: £1,400,000 Funding Source: Capital Plan and Imperial College Union reserves Construction Project Programme: Start on Site: August 2006 End Date: March

195

Volume Project  

E-Print Network [OSTI]

Math 13900. Volume Project. For the following project, you may use any materials. This must be your own original creation. Construct a right pyramid with a base...

rroames

2010-01-12T23:59:59.000Z

196

U.S. Department of Energy Project Review Guide for Capital Asset Projects  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide addresses the various project reviews conducted during the life-cycle of a project based on the stage, complexity and duration of a project. This Guide describes typical reviews, the purpose of each, the timing during the project life-cycle, lines of inquiry, and required documentation. No cancellations.

2008-09-23T23:59:59.000Z

197

Project Controls  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

1997-03-28T23:59:59.000Z

198

The Hierarchical Rater Model for Rated Test Items and its Application to Large-Scale Educational Assessment Data  

E-Print Network [OSTI]

-ended (or "constructed response") test items have become a standard part of the educational assessment

199

Material Stabilization Project Management Plan  

SciTech Connect (OSTI)

This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides.

SPEER, D.R.

1999-09-01T23:59:59.000Z

200

Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters  

E-Print Network [OSTI]

, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost...

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

MIP-based heuristics for multi-item capacitated lot-sizing problem ...  

E-Print Network [OSTI]

take into account a set of additional constraints. ... about safety stock deficits for which we introduce a unitary cost parameter for each item at each period.

2005-09-30T23:59:59.000Z

202

Meeting Action Items and Highlights from the Bio-Derived Liquids...  

Broader source: Energy.gov (indexed) [DOE]

from the Bio-Derived Liquids to Hydrogen Distributed Reforming Working Group (BILIWG) & Hydrogen Production Technical Team Research Review Meeting Action Items and Highlights...

203

E-Print Network 3.0 - assessment item format Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NJ... at 50 ms( s) Loss concentrated at midplane v Action Items Calculate power density of prompt loss Source: Fusiongnition Research Experiment (FIRE) Collection: Plasma...

204

Project Fact Sheet Project Update  

E-Print Network [OSTI]

Project Fact Sheet Project Update: Project Brief: The works cover the refurbishment of floors 4, 5, with `wet' labs for molecular biology, materials characterisation, cell culture and flow studies, and `dry operating theatre. The Bionanotechnology Centre is one of the projects funded from the UK Government's £20

205

The Value of Knowing a Demand Curve: Bounds on Regret for On-line Posted-Price  

E-Print Network [OSTI]

The Value of Knowing a Demand Curve: Bounds on Regret for On-line Posted-Price Auctions PRELIMINARY sequentially with a popu- lation of n buyers through an on-line posted-price auction mechanism, a paradigm names a price between 0 and 1; the buyer decides whether or not to buy the item at the specified price

Kleinberg, Robert D.

206

Transmission Line Security Monitor: Final Report  

SciTech Connect (OSTI)

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

207

Circle Project  

E-Print Network [OSTI]

This project asks students to decide if a collection of points in space do or do not lie on a ... The project is accessible to linear algebra students who have studied...

208

Warranty and Fair Pricing for Used Items in Two-Dimensional Boyan Dimitrov  

E-Print Network [OSTI]

and is valid during some limited future time of use, or until some future mileage is driven, whichever comesWarranty and Fair Pricing for Used Items in Two-Dimensional Life Time Boyan Dimitrov Dept-dimensional life to illustrate how cost characteristics should be fairly assessed. Pricing of used items

Stanchev, Peter

209

Wind Integration Forum June 6, 2011 Action Items Update December, 2011  

E-Print Network [OSTI]

Wind Integration Forum June 6, 2011 Action Items Update December, 2011 The action items from the June 6 Wind Integration Steering Committee are repeated below, followed by brief summaries of progress concern over possible impacts on grid stability from the growing wind fleet. BPA will report back

210

Impact of forecasting error on the performance of capacitated multi-item production systems  

E-Print Network [OSTI]

Impact of forecasting error on the performance of capacitated multi-item production systems Jinxing multi-item production system under demand uncertainty and a rolling time horizon. The output from parameters, thus improving the performance of production systems. q 2004 Elsevier Ltd. All rights reserved

Xie, Jinxing

211

Managing Inventory of Items with Replacement Wei Huang Vidhyadhar Kulkarni 1  

E-Print Network [OSTI]

Managing Inventory of Items with Replacement Warranty Wei Huang Vidhyadhar Kulkarni 1 Jayashankar items under warranty. We model this setting as a multi-period single product inventory problem where that neglects warranty repairs. Keyword: Warranty, Inventory, Stochastic Demand, Information. 1 This work

Kulkarni, Vidyadhar G.

212

Evaluation of Segmentation Techniques for Inventory Management in Large Scale Multi-Item Inventory Systems1  

E-Print Network [OSTI]

1 Evaluation of Segmentation Techniques for Inventory Management in Large Scale Multi-Item Inventory Systems1 Manuel D. Rossetti2 , Ph. D., P. E. Department of Industrial Engineering University of their inventory policies in a large-scale multi-item inventory system. Conventional inventory segmentation

Rossetti, Manuel D.

213

SEFS Proposal Cover Sheet P.I.: Project Title  

E-Print Network [OSTI]

and Engineering Forest Ecology Forest Soils Forest Systems and Bioenergy Restoration Ecology and Environmental Horticulture Social Sciences Sustainable Resource Management Wildlife Science GC-1 Questions: 1. Does items be transported outside the United States in connection with this project?Yes No 10b

Borenstein, Elhanan

214

Boron-10 Lined Proportional Counter Wall Effects  

SciTech Connect (OSTI)

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project 'Coincidence Counting With Boron-Based Alternative Neutron Detection Technology' at Pacific Northwest National Laboratory (PNNL) for development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube based system in the configuration of a coincidence counter. This report provides information about how variations in proportional counter radius and gas pressure in a typical coincident counter design might affect the observed signal from boron-lined tubes. A discussion comparing tubes to parallel plate counters is also included.

Siciliano, Edward R.; Kouzes, Richard T.

2012-05-01T23:59:59.000Z

215

EC Transmission Line Risk Identification and Analysis  

SciTech Connect (OSTI)

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

216

Project Construction  

Broader source: Energy.gov [DOE]

Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

217

Magnesium Projects  

Broader source: Energy.gov (indexed) [DOE]

cyberinfrastructure projects and will be augmented by original research in Computer Science and Software Engineering towards the creation of large, distributed, autonomic and...

218

CRAD, Safety Basis - Idaho Accelerated Retrieval Project Phase...  

Broader source: Energy.gov (indexed) [DOE]

Idaho Accelerated Retrieval Project Phase II CRAD, Safety Basis - Idaho Accelerated Retrieval Project Phase II February 2006 A section of Appendix C to DOE G 226.1-2 "Federal Line...

219

THE IMPACT OF ANCHOR ITEM EXPOSURE ON MEAN/SIGMA LINKING AND IRT TRUE SCORE EQUATING UNDER THE NEAT DESIGN  

E-Print Network [OSTI]

have evaluated the impact of exposed anchor items on the IRT equating process using Monte Carlo investigations (Jurich, DeMars, & Goodman, 2012; Jurich, Goodman, & Becker, 2010). However, studies of item exposure up to this date 3 have not placed... condition that included examinees with a low level of ability or the condition with the organized item theft group. Few studies have investigated the impact of exposed anchor items on the IRT equating process using Monte Carlo investigations. Jurich, De...

Barri, Moatasim Asaad

2013-08-31T23:59:59.000Z

220

The Hierarchical Rater Model for Rated Test Items and its Application to LargeScale Educational Assessment Data 1  

E-Print Network [OSTI]

­ended (or ``constructed response'') test items have become a standard part of the educational assessment

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

NREL: Biomass Research - Biomass Characterization Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Biomass Characterization Projects A photo of a magnified image on a computer screen. Many blue specks and lines in different sizes and shapes are visible on top of a white...

222

Implementation of NUREG-1318 guidance within the Yucca Mountain Project  

SciTech Connect (OSTI)

The US Department of Energy`s Yucca Mountain Project is implementing a quality assurance program that fulfills the requirements of the US Nuclear Regulatory Commission (NRC). Additional guidance for this program was provided in NUREG 1318, ``Technical Position on Items and Activities in the High-Level Waste Geologic Repository Program Subject to Quality Assurance Requirements`` for identification of items and activities important to public radiological safety and waste isolation. The process and organization for implementing this guidance is discussed. 3 refs., 2 figs.

La Monica, L.B.; Waddell, J.D.; Hardin, E.L.

1990-04-01T23:59:59.000Z

223

Polar Maps at the William C. Wonders Map Collection, University of Alberta Display items -PLC June 2008  

E-Print Network [OSTI]

Polar Maps at the William C. Wonders Map Collection, University of Alberta Display items - PLC June, University of Alberta Display items - PLC June 2008 C:\\Documents and Settings items - PLC June 2008 C:\\Documents and Settings\\mclarke\\Desktop\\PolarLibraries.doc10/3/2008 3 7 Title

MacMillan, Andrew

224

Preparation for Scientists Sailing on the JOIDES Resolution Items strictly prohibited on the ship  

E-Print Network [OSTI]

, chocolate, snacks Soft drinks, coffee, Lipton black/green tea Good coffee and herbal tea GENERAL INFORMATION follow on the next page. Some items, such as coffee, tea, snacks, and toiletries may be purchased

225

ITEM RESPONSE THEORY SCALING OF AN ACADEMIC MEDICAL CENTER STUDENT SATISFACTION SURVEY  

E-Print Network [OSTI]

Item response theory scaling has been well established in achievement testing, but the practice has seen limited use in student development research. The purpose of this study was to explore the reliability and validity ...

Meiers, Christopher Stephen

2010-05-06T23:59:59.000Z

226

Guideline for the seismic technical evaluation of replacement items for nuclear power plants  

SciTech Connect (OSTI)

Seismic qualification for equipment originally installed in nuclear power plants was typically performed by the original equipment suppliers or manufactures (OES/OEM). Many of the OES/OEM no longer maintain quality assurance programs with adequate controls for supplying nuclear equipment. Utilities themselves must provide reasonable assurance in the continued seismic adequacy of such replacement items. This guideline provides practical, cost-effective techniques which can be used to provide reasonable assurance that replacement items will meet seismic performance requirements necessary to maintain the seismic design basis of commercial nuclear power plants. It also provides a method for determining when a seismic technical evaluation of replacement items (STERI) is required as part of the procurement process for spare and replacement items. Guidance on supplier program requirements necessary to maintain continued seismic adequacy and on documentation of maintaining required seismic adequacy is also included.

Harris, S.P.; Cushing, R.W. (EQE International, San Francisco, CA (United States)); Johnson, H.W. (Programmatic Solutions, Smithtown, NY (United States)); Abeles, J.M. (System 1, Inc., Potomac, MD (United States))

1993-02-01T23:59:59.000Z

227

Report of the ANS Project Feasibility Workshop for a High Flux Isotope Reactor-Center for Neutron Research Facility  

SciTech Connect (OSTI)

The Advanced Neutron Source (ANS) Conceptual Design Report (CDR) and its subsequent updates provided definitive design, cost, and schedule estimates for the entire ANS Project. A recent update to this estimate of the total project cost for this facility was $2.9 billion, as specified in the FY 1996 Congressional data sheet, reflecting a line-item start in FY 1995. In December 1994, ANS management decided to prepare a significantly lower-cost option for a research facility based on ANS which could be considered during FY 1997 budget deliberations if DOE or Congressional planners wished. A cost reduction for ANS of about $1 billion was desired for this new option. It was decided that such a cost reduction could be achieved only by a significant reduction in the ANS research scope and by maximum, cost-effective use of existing High Flux Isotope Reactor (HFIR) and ORNL facilities to minimize the need for new buildings. However, two central missions of the ANS -- neutron scattering research and isotope production-were to be retained. The title selected for this new option was High Flux Isotope Reactor-Center for Neutron Research (HFIR-CNR) because of the project`s maximum use of existing HFIR facilities and retention of selected, central ANS missions. Assuming this shared-facility requirement would necessitate construction work near HFIR, it was specified that HFIR-CNR construction should not disrupt normal operation of HFIR. Additional objectives of the study were that it be highly credible and that any material that might be needed for US Department of Energy (DOE) and Congressional deliberations be produced quickly using minimum project resources. This requirement made it necessary to rely heavily on the ANS design, cost, and schedule baselines. A workshop methodology was selected because assessment of each cost and/or scope-reduction idea required nearly continuous communication among project personnel to ensure that all ramifications of propsed changes.

Peretz, F.J.; Booth, R.S. [comp.

1995-07-01T23:59:59.000Z

228

Differential item functioning in the Peabody Picture Vocabulary Test - Third Edition: partial correlation versus expert judgment  

E-Print Network [OSTI]

and content by: Cecil R. Reynolds (Chair of Committee) Maricela Oliva (Member) Cynthia A. Riccio (Member) Victor L. Willson (Head of Department) Salvador Hector Ochoa (Member) December 2003 Major Subject: School Psychology... Committee: Dr. Cecil R. Reynolds This study had three purposes: (1) to identify differential item functioning (DIF) on the PPVT-III (Forms A & B) using a partial correlation method, (2) to find a consistent pattern in items identified...

Conoley, Colleen Adele

2004-09-30T23:59:59.000Z

229

Downgrade of the Savannah River Sites FB-Line  

SciTech Connect (OSTI)

This paper will discuss the Safeguards & Security (S&S) activities that resulted in the downgrade of the Savannah River Site's FB-Line (FBL) from a Category I Material Balance Area (MBA) in a Material Access Area (MAA) to a Category IV MBA in a Property Protection Area (PPA). The Safeguards activities included measurement of final product items, transferal of nuclear material to other Savannah River Site (SRS) facilities, discard of excess nuclear material items, and final measurements of holdup material. The Security activities included relocation and destruction of classified documents and repositories, decertification of a classified computer, access control changes, updates to planning documents, deactivation and removal of security systems, Human Reliability Program (HRP) removals, and information security training for personnel that will remain in the FBL PPA.

SADOWSKI, ED; YOURCHAK, RANDY; PRETZELLO MARJI; MIXON, BONNIE; LYNN, ROBBIE

2005-07-05T23:59:59.000Z

230

PFBC Utility Demonstration Project  

SciTech Connect (OSTI)

This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

Not Available

1992-11-01T23:59:59.000Z

231

ROTATING LINE CAMERAS: EPIPOLAR GEOMETRY AND SPATIAL SAMPLING  

E-Print Network [OSTI]

project 3D scenes on a cylindric sur- face, where one or multiple rotating sensor lines allow to compose for controlling this error, allowing to adjust the camera position- ing at the time of photo shooting. The report

232

Boron-10 Lined Proportional Counter Model Validation  

SciTech Connect (OSTI)

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project Coincidence Counting With Boron-Based Alternative Neutron Detection Technology at Pacific Northwest National Laboratory (PNNL) for the development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube-based alternative system in the configuration of a coincidence counter. This report discusses the validation studies performed to establish the degree of accuracy of the computer modeling methods current used to simulate the response of boron-lined tubes. This is the precursor to developing models for the uranium neutron coincidence collar under Task 2 of this project.

Lintereur, Azaree T.; Siciliano, Edward R.; Kouzes, Richard T.

2012-06-30T23:59:59.000Z

233

Project X  

E-Print Network [OSTI]

provided by Project X would be a cost- effective approach toin Section I and for the cost estimate necessary as part ofby DOE order 413.3b. The cost range required for CD-0 will

Holmes, Steve

2014-01-01T23:59:59.000Z

234

Project Manager  

Broader source: Energy.gov [DOE]

A successful candidate in this position will serve as a project manager in the Fuel Cell Technologies Office in the DOE-EERE Office of Transportation responsible for a wide variety of highly...

235

Project Title:  

Broader source: Energy.gov (indexed) [DOE]

0 181 0 Hazardous Air Pollutants? Is the project subject to emissions limitations in an Air Quality 0 181 0 Control Region? 2 Revised on: 11122008 NEPA COMPLIANCE SURVEY Impacts...

236

EIS-0344: Grand Coulee-Bell 500 kV Transmission Line  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

237

SunLine Expands Horizons with Fuel Cell Bus Demo. Hydrogen, Fuel...  

Broader source: Energy.gov (indexed) [DOE]

Expands Horizons with Fuel Cell Bus Demo. Hydrogen, Fuel Cells & Infrastructure Technologies Program, Fuel Cell Bus Demonstration Projects (Fact Sheet). SunLine Expands Horizons...

238

Project Fact Sheet Project Update  

E-Print Network [OSTI]

medical and dental centre; shop and café area for students and vacation accommodation centre. The new & Figures: Budget: £51,074,000 Funding Source: Capital Plan Construction Project Programme: Start on Site

239

Minnesota Agripower Project. Quarterly report, July 1996--September 1996  

SciTech Connect (OSTI)

Program status and accomplishments for the quarter are summarized in this report. The Agri-Power project is aimed at the development of alfalfa as a biomass fuel for power generation. Components of the project include varietal evaluation and selection; development of harvest, storage, and transportation systems; pellet production; and assessment of gasification and other combustion systems. Major items reported for the quarter include: (1) Design Package - economic analysis, (2) Review and Confirmation of the Alfalfa Feedwater Supply - sampling studies and resistance studies of varietals, and (3) Project Management, Engineering, and Administration - evaluation of gasification and power generating cycles.

Hanson, C.

1997-01-01T23:59:59.000Z

240

DOE-EPRI On-Line Monitoring Implementation Guidelines  

SciTech Connect (OSTI)

Industry and EPRI experience at several plants has shown on-line monitoring to be very effective in identifying out-of-calibration instrument channels or indications of equipment-degradation problems. The EPRI implementation project for on-line monitoring has demonstrated the feasability of on-line monitoring at several participating nuclear plants. The results have been very enouraging, and substantial progress is anticipated in the coming years.

E. Davis, R. Bickford

2003-01-02T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

DOE-EPRI On-Line Monitoring Implementation Guidelines  

SciTech Connect (OSTI)

OAK B139 Industry and EPRI experience at several plants has shown on-line monitoring to be very effective in identifying out-of-calibration instrument channels or indications of equipment-degradation problems. The EPRI implementation project for on-line monitoring has demonstrated the feasibility of on-line monitoring at several participating nuclear plants. The results have been very encouraging, and substantial progress is anticipated in the coming years.

E. Davis; R. Bickford

2003-01-02T23:59:59.000Z

242

UMTRA project list of reportable occurrences  

SciTech Connect (OSTI)

This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, are omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.

Not Available

1994-04-01T23:59:59.000Z

243

Project Final Report UBC LBS Project Services1 Project Final Report UBC LBS Project Services2  

E-Print Network [OSTI]

Project Final Report UBC LBS Project Services1 #12;Project Final Report UBC LBS Project Services2 EXECUTIVE SUMMARY The purpose of the UBC Project Services web-based project management portal project on campus within Project Services, and with the rest of the UBC community. We began this project by defining

244

Series Transmission Line Transformer  

DOE Patents [OSTI]

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

245

Line geometry and electromagnetism III: groups of transformations  

E-Print Network [OSTI]

The role of linear and projective groups of transformations in line geometry and electromagnetism is examined in accordance with Klein's Erlanger Programm for geometries. The group of collineations of real projective space is chosen as the most general group, and reductions to some of its various subgroups are then detailed according to their relevance to electromagnetic fields, and especially wave-like ones.

D. H. Delphenich

2014-04-16T23:59:59.000Z

246

Cloudnet Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

Cloudnet is a research project supported by the European Commission. This project aims to use data obtained quasi-continuously for the development and implementation of cloud remote sensing synergy algorithms. The use of active instruments (lidar and radar) results in detailed vertical profiles of important cloud parameters which cannot be derived from current satellite sensing techniques. A network of three already existing cloud remote sensing stations (CRS-stations) will be operated for a two year period, activities will be co-ordinated, data formats harmonised and analysis of the data performed to evaluate the representation of clouds in four major european weather forecast models.

Hogan, Robin

247

Electric Transmission Lines (Nebraska)  

Broader source: Energy.gov [DOE]

The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway crossings. This section contains general regulations...

248

PROJECT REQUEST FORM PROJECT HOLDER INFORMATION  

E-Print Network [OSTI]

PROJECT REQUEST FORM Last Name: Email: PROJECT HOLDER INFORMATION UCID:Last Name: Email: Institute if different than Project Holder) First Name: Project Short Name: (50 characters max) (for eFIN view only) Project Title: PROJECT INFORMATION Start Date (MM/DD/YYYY): End Date (MM/DD/YYYY): For Questions or HELP

de Leon, Alex R.

249

Concurrent Wind Cooling in Power Transmission Lines  

SciTech Connect (OSTI)

Idaho National Laboratory and the Idaho Power Company, with collaboration from Idaho State University, have been working on a project to monitor wind and other environmental data parameters along certain electrical transmission corridors. The combination of both real-time historical weather and environmental data is being used to model, validate, and recommend possibilities for dynamic operations of the transmission lines for power and energy carrying capacity. The planned results can also be used to influence decisions about proposed design criteria for or upgrades to certain sections of the transmission lines.

Jake P Gentle

2012-08-01T23:59:59.000Z

250

FEDIX on-line information service: Design, develop, test, and implement, an on-line research and education information service  

SciTech Connect (OSTI)

The FEDIX Annual Status Report provides details regarding an on-line information project designed, developed and implemented by Federal Information Exchange, Inc., a diversified information services company. This document details the project design activities, summarizes the developmental phases of the project and describes the implementation activities generated to fulfill the project's objectives. The information contained in this document illustrates FIE's continuing commitment to serve as the link that facilitates the dissemination of federal information to the education community. This report reviews the project accomplishments and describes intended service enhancements.

Rodman, J.A.

1992-01-01T23:59:59.000Z

251

Geodesic Lines, . . . Covariant . . .  

E-Print Network [OSTI]

Geodesic Lines, . . . Covariant . . . Home Page Title Page Page 781 of 818 Go Back Full Screen Close Quit 14.11. Geodesic Lines, Local Gauss-Bonnet Theorem Geodesics play a very important role in surface theory and in dynamics. One of the main reasons why geodesics are so important

Gallier, Jean

252

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

253

Project Fact Sheet Project Brief  

E-Print Network [OSTI]

Name: Centre for Assisted Robotic Surgery Number: BESS1002b Project Champion: Professor Guang-Zong Yang of the refurbishment is to renew and expand the laboratory space for Robotic Assisted Surgery at the South Kensington Campus as par to the Hamlyn Centre for Robotic Surgery. The overall programme incorpo- rates both core

254

Intrinsic AGN Absorption Lines  

E-Print Network [OSTI]

Strong absorption lines are common in rest-frame UV spectra of AGNs due to a variety of resonant transitions, for example the HI Lyman series lines (most notably Ly-alpha 1216) and high-ionization doublets like CIV 1549,1551. The lines are called ``intrinsic'' if the absorbing gas is physically related to the AGN, e.g. if the absorber resides broadly within the radius of the AGN's surrounding ``host'' galaxy. Intrinsic absorption lines are thus valuable probes of the kinematics, physical conditions and elemental abundances in the gas near AGNs. Studies of intrinsic absorbers have historically emphasized the broad absorption lines (BALs) in quasars. Today we recognize a wider variety of intrinsic lines in a wider range of objects. For example, we now know that Seyfert 1 galaxies (the less luminous cousins of quasars) have intrinsic absorption. We also realize that intrinsic lines can form in a range of AGN environments --- from the dynamic inner regions like the BALs, to the more quiescent outer host galaxies >10 kpc away. This article provides a brief introduction to current observational and theoretical work on intrinsic AGN absorbers.

Fred Hamann

2000-06-12T23:59:59.000Z

255

Coherent soliton communication lines  

SciTech Connect (OSTI)

The data transmission in coherent fiber-optical communication lines using solitons with a variable phase is studied. It is shown that nonlinear coherent structures (solitons) can be applied for effective signal transmission over a long distance using amplitude and optical-phase keying of information. The optimum ratio of the pulse width to the bit slot at which the spectral efficiency (transmitted bits per second and hertz) is maximal is determined. It is shown that soliton fiber-optical communication lines can ensure data transmission at a higher spectral efficiency as compared to traditional communication lines and at a high signal-to-noise ratio.

Yushko, O. V., E-mail: olesya.yushko@gmail.com; Redyuk, A. A.; Fedoruk, M. P.; Turitsyn, S. K. [Novosibirsk State University (Russian Federation)

2014-11-15T23:59:59.000Z

256

EIS-0152: Iroquois, Tenn. Phase I, Pipeline Line Project  

Broader source: Energy.gov [DOE]

The Federal Energy Regulatory Commission prepared this statement to asses the environmental impacts of constructing and operating an interstate natural gas pipeline and associated infrastructure to transport gas from Canada and domestic sources to the New England Market, as proposed by the Iroquois Gas Transmission System and the Tennessee Gas Pipeline Company. The U.S. Department of Energy Office of Fossil Energy was a cooperating agency during statement development and adopted the statement on 9/1/1990.

257

Sierra Pacific Power Company Alturas Transmission Line Project...  

Broader source: Energy.gov (indexed) [DOE]

to prevent or e emissions of figitive dust during construction. Sierra County, Air Pollution Control District and Washoe County District Hdth Department's Alr Quality Management...

258

Projective lines over one-dimensional semilocal domains  

E-Print Network [OSTI]

The homogeneous components of an element of q?A are in both q and A (the latter because of the uniqueness of the expression of an element of B = ?? n=0.

2013-01-21T23:59:59.000Z

259

EIS-0463: Northern Pass Transmission Line Project, New Hampshire |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThis EISStatementUtah, andto Conduct ScopingDepartment of

260

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThis EISStatementUtah,Department

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

EIS-0499: Great Northern Transmission Line Project, Minnesota | Department  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement | Department of333Energy SUMMARY

262

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project,  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement | Department of333Energy

263

Northern Pass Transmission Line Project Environmental Impact Statement:  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2EnergyDepartment ofNewsNortheastB O N N E V I L L

264

Proposed Southline Transmission Line Project - Volume 2 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.2

265

Proposed Southline Transmission Line Project - Volume 3 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.23

266

Proposed Southline Transmission Line Project - Volume 4 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.234

267

Proposed Southline Transmission Line Project - Volume 4 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.234

268

Proposed Southline Transmission Line Project - Volume 4 of 4  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket37963 Vol. 79, No. 128 Thursday, July 3,31548 Vol.234

269

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration - Rocky Mountain Lovell-Yellowtail

270

Section 1222 Program - Proposed Plains & Eastern Clean Line Project  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists' Research |Regulation Services2014NeedCollegeofSeismicIBL) PresentedFrequently Asked

271

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy Savers [EERE]

2011) More Documents & Publications EIS-0486: Draft Environmental Impact Statement HVDC Workshop - April 22, 2013 EIS-0486: Notice of Intent and Notice of Potential Floodplain...

272

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy Savers [EERE]

the commercial issues involving large utilities and generating plants throughout Latin and North America. Mr. Hurtado holds a Bachelor of Arts degree in political science...

273

CEELP Quarterly Environmental & Energy Newsletter The following items appear in this edition  

E-Print Network [OSTI]

May 2007 CEELP Quarterly Environmental & Energy Newsletter Issue 1 The following items appear in this edition: (1) The Welsh Assembly Government: Approaches to Energy and Climate Change (2) Implications of the Government of Wales Act 2006 and the 2007 Assembly Elections for Energy and Climate Change in Wales (3

Martin, Ralph R.

274

Controlled items for SI non-space ITAR in Times Roman  

E-Print Network [OSTI]

waterplane area vessels' having any of the following: i.1. Full load displacement exceeding 500 tonnes Submersible vehicles and surface vessels, as follows (see List of Items Controlled). a. Manned, tethered vehicles having any of the following: b.1. Designed to `operate autonomously' and having a lifting capacity

275

FPGA Acceleration for the Frequent Item Problem Jens Teubner Rene Mueller Gustavo Alonso  

E-Print Network [OSTI]

associated with modern CPU architectures are well known: high power consumption, heat dissipation, network data paths (network-CPU, disk-CPU) to reduce the load and amount of data that hits the CPU [4]. What a basic data mining operation, the calculation of frequent items in a data collection, and show how it can

Teubner, Jens

276

JOURNAL OF RARE EARTHS, Vol. 27, No. 2, Apr. 2009, p. 270 Foundation item  

E-Print Network [OSTI]

August 2008; revised 12 September 2008 Abstract: Rare earth elements have been used for 30 years; Juglans nigra; rare earths Rare earth elements (REEs) are metallic ions comprising elementsJOURNAL OF RARE EARTHS, Vol. 27, No. 2, Apr. 2009, p. 270 Foundation item: Corresponding author

277

PPPL PRINCETON PLASMA PHYSICS LABORATORY TERMS & CONDITIONS FOR COMMERCIAL ITEMS OR SERVICES  

E-Print Network [OSTI]

) "Agreement" means Purchase Order, Subcontract, Price Agreement, Basic Ordering Agreement, or any mod by Princeton for DOE under Prime Contract No. DE-AC02-09CH11466. (f) "Princeton" means the Trustees orders and agreements for commer- cial items or services awarded by Princeton University Plasma Physics

278

Where can I recycle it year-round? Item Local Recycling Locations  

E-Print Network [OSTI]

Where can I recycle it year-round? Item Local Recycling Locations Styrofoam First Alternative Co-op Recycling Center, 1007 SE 3rd St., 541-753-3115 (small fee) Packing Peanuts OSU Surplus, 644 SW 13 th St., 541-737-7347 Commercial shipping stores Film Plastics First Alternative Co-op Recycling Center, 1007

Escher, Christine

279

Transmission line environmental assessment guidance document  

SciTech Connect (OSTI)

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

280

Dynamic Line Rating: Research and Policy Evaluation  

SciTech Connect (OSTI)

Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of electrical conductors to be increased based on local weather conditions. Overhead lines are conventionally given a conservative rating based on worst case scenarios. We demonstrate that observing the conditions in real time leads to additional capacity and safer operation. This paper provides a report of a pioneering scheme in the United States of America in which DLR has been applied. Thereby, we demonstrate that observing the local weather conditions in real time leads to additional capacity and safer operation. Secondly, we discuss limitations involved. In doing so, we arrive at novel insights which will inform and improve future DLR projects. Third, we provide a policy background and discussion to clarify the technologys potential and identifies barriers to the imminent adoption of dynamic line rating systems. We provide suggestions for regulatory bodies about possible improvements in policy to encourage adoption of this beneficial technology.

Jake P. Gentle; Kurt S. Myers; Michael R. West

2014-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Electric Transmission Lines (Iowa)  

Broader source: Energy.gov [DOE]

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

282

Holes in Spectral Lines  

E-Print Network [OSTI]

The decay of an atom in the presence of a static perturbation is investigated. The perturbation couples a decaying state with a nondecaying state. A "hole" appears in the emission line at a frequency equal to the frequency ...

Fontana, Peter R.; Srivastava, Rajendra P.

1973-06-01T23:59:59.000Z

283

Power line detection system  

DOE Patents [OSTI]

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

Latorre, Victor R. (Tracy, CA); Watwood, Donald B. (Tracy, CA)

1994-01-01T23:59:59.000Z

284

Power line detection system  

DOE Patents [OSTI]

A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

Latorre, V.R.; Watwood, D.B.

1994-09-27T23:59:59.000Z

285

Line Extension Alternatives  

Broader source: Energy.gov [DOE]

The Public Service Board (PSB) of Vermont developed rules regarding utility line extension requests. While the majority of the rules focus on the procedure followed (and associated fees) for the...

286

Hallmark Project  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietip sheetK-4In 2013 many autoThis road map isofAOnOctoberProject

287

PROJECT SUMMARY  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDieselEnergyHistoryWATER-ENERGYofPROJECT

288

Custom Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases onOrganization FY 2012 FY 2013 FYCurtailment DateCustom-Projects

289

Project Gnome  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - SeptemberMicroneedles for4-16Hamada winsProgress ReportProject CostEnergy

290

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12 generally cannot be achieved for reasonable computational cost. Applications that require modeling, and in nondestructive testing. The objective of this project is to advance the state of the art in electromagnetic

Perkins, Richard A.

291

Project Management Practices  

Energy Savers [EERE]

on the DOE Project Management web page. 1.2 INTENDED USE Federal Project Directors, Contracting Officers, Contracting Officer's Technical Representatives, Integrated Project Team...

292

PROCEDURES FOR ARC PROJECTS  

E-Print Network [OSTI]

PROCEDURES FOR ARC PROJECTS Revised - May 2013 Agricultural Research Center Washington State University #12;Table of Contents THE PROJECT SYSTEM, AN INTRODUCTION................................................................................. 5 DEVELOPING AN ARC PROJECT

Collins, Gary S.

293

Transmission line capital costs  

SciTech Connect (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

294

Project W-320, 241-C-106 sluicing: Civil/structural calculations. Volume 3  

SciTech Connect (OSTI)

This supporting document has been prepared to make the FDNW civil/structural calculations for Project W-320 readily retrievable. The Equipment Removal System (ERS) has been identified by WHC as not having any safety class 1 items present in the tank pits during equipment removal activities, Documentation of this finding is provided in Letter of Instruction 3/1 Analysis Requirements for Project W-320 Equipment Removal System (REF: LOI KGS-94-013). Based on this specific direction from WHC, 3/1 analysis for any component of the Project W-320 ERS is required. No further documentation of non-safety impacting safety items is required per DOE-RL Audit finding No.90-02, and filing of this memorandum in the W-320 project files satisfies the intent of the referenced DOE observation.

Bailey, J.W.

1998-07-24T23:59:59.000Z

295

Action Items  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartment of EnergyAbout Us » FAQsUCNIOF ENERGYU.S.-BrazilACTION

296

SkyMine Carbon Mineralization Pilot Project  

SciTech Connect (OSTI)

This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

Joe Jones; Clive Barton; Mark Clayton; Al Yablonsky; David Legere

2010-09-30T23:59:59.000Z

297

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment of EnergyProgram2-26 Date:CharterDepartmentDOE LM ) SCT&E LNG, LLC8

298

Device Oriented Project Controller  

SciTech Connect (OSTI)

This proposal is directed at the issue of developing control systems for very large HEP projects. A de-facto standard in accelerator control is the Experimental Physics and Industrial Control System (EPICS), which has been applied successfully to many physics projects. EPICS is a channel based system that requires that each channel of each device be configured and controlled. In Phase I, the feasibility of a device oriented extension to the distributed channel database was demonstrated by prototyping a device aware version of an EPICS I/O controller that functions with the current version of the channel access communication protocol. Extensions have been made to the grammar to define the database. Only a multi-stage position controller with limit switches was developed in the demonstration, but the grammar should support a full range of functional record types. In phase II, a full set of record types will be developed to support all existing record types, a set of process control functions for closed loop control, and support for experimental beam line control. A tool to configure these records will be developed. A communication protocol will be developed or extensions will be made to Channel Access to support introspection of components of a device. Performance bench marks will be made on both communication protocol and the database. After these records and performance tests are under way, a second of the grammar will be undertaken.

Dalesio, Leo; Kraimer, Martin

2013-11-20T23:59:59.000Z

299

DOE Energy Challenge Project  

SciTech Connect (OSTI)

Project Objectives: 1. Promote energy efficiency concepts in undergraduate and graduate education. 2. Stimulate and interest in pulp and paper industrial processes, which promote and encourage activities in the area of manufacturing design efficiency. 3. Attract both industrial and media attention. Background and executive Summary: In 1997, the Institute of Paper Science and Technology in conjunction with the U.S. Department of Energy developed a university design competition with an orientation to the Forest Products Industry. This university design competition is in direct alignment with DOEs interests in instilling in undergraduate education the concepts of developing energy efficient processes, minimizing waste, and providing environmental benefits and in maintaining and enhancing the economic competitiveness of the U.S. forest products industry in a global environment. The primary focus of the competition is projects, which are aligned with the existing DOE Agenda 2020 program for the industry and the lines of research being established with the colleges comprising the Pulp and Paper Education and Research Alliance (PPERA). The six design competitions were held annually for the period 1999 through 2004.

Frank Murray; Michael Schaepe

2009-04-24T23:59:59.000Z

300

Project Management Lessons Learned  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and aids the federal project directors and integrated project teams in the execution of projects.

2008-08-05T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Pressure drops for direct steam generation in line-focus solar thermal systems  

E-Print Network [OSTI]

Early direct steam generation prototypes include two central tower projects: a solar-powered enhanced oil recovery project called STEOR in the early 1980s (Romero 2002), and a solar tower projectPressure drops for direct steam generation in line-focus solar thermal systems John Pye1 , Graham

302

Windy Gap Firming Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOEEIS-0370 (cooperating agency) Western's proposed...

303

Perspectives on Project Finance  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Perspectives on Project Finance John May, Managing Partner, Stern Brothers & Co.

304

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan 6 PPPL Laboratory Director S.Prager Deputy Director.Gentile Centerstack Dsgn & Fab J. Chrzanowski NSTX Upgrade Project Manager R. Strykowsky Deputy and Construction Manager E. Perry Project Controls S. Langish NSTXCenterstack Manager L. Dudek NSTXNeutral Beam Manager T

Princeton Plasma Physics Laboratory

305

NSTX Upgrade Project Project Execution Plan  

E-Print Network [OSTI]

NSTX Upgrade Project Project Execution Plan Appendix 1 - WBS Dictionary 25 Appendix 1 - NSTX Upgrade Project Work Breakdown Structure This Work Breakdown Structure (WBS) organizes and defines the scope of the NSTX Upgrade using the WBS as established by the original NSTX project and modified

Princeton Plasma Physics Laboratory

306

CIMI PROJECT LONG TERM THEMATIC PROJECT  

E-Print Network [OSTI]

thematic projects (3 months) on specific topics in mathematics, computer science and their interactionsCIMI PROJECT LONG TERM THEMATIC PROJECT This document aims at providing guidance on the format to be used when submitting a scientific project to CIMI Executive Committee. CIMI will support long term

Ledoux, Michel

307

Livingston Solar Canopy Project The Project  

E-Print Network [OSTI]

,000 high efficiency solar panels on canopy structures over two major surface parking areasLivingston Solar Canopy Project The Project: This project entails the installation of more than 40. In conjunction with the existing 1.4 megawatt solar energy facility on this campus, this project will generate

Delgado, Mauricio

308

Information Visualization Graduate Project (Group Project)  

E-Print Network [OSTI]

Information Visualization Fall 2011 Graduate Project (Group Project) (100 points total) Handed out:59PM Research Article due by online submission on Sunday, December 11, 2011, 11:59PM Project Demo due last week of classes The idea of the project is to take the knowledge and background that you

Rusu, Adrian

309

Project Title Project Sponsor (funding agency)  

E-Print Network [OSTI]

and procedures applicable to the above project; and we confirm that the PI is eligible to apply in accordance Project Title Project Sponsor (funding agency) Declaration of Principal Investigator (PI) I certify that: I agree that my participation in the project must be in accordance with all

Saskatchewan, University of

310

A New Item Response Theory Model for Open-Ended Online Homework with Multiple Allowed Attempts  

E-Print Network [OSTI]

Item Response Theory (IRT) was originally developed in traditional exam settings, and it has been shown that the model does not readily transfer to formative assessment in the form of online homework. We investigate if this is mostly due to learner traits that do not become apparent in exam settings, namely random guessing due to lack of diligence or dedication, and copying work from other students or resources. Both of these traits mask the true ability of the learner, which is the only trait considered in most mainstream unidimensional IRT models. We find that indeed the introduction of these traits allows to better assess the true ability of the learners, as well as to better gauge the quality of assessment items. Correspondence of the model traits to self-reported behavior is investigated and confirmed. We find that of these two traits, copying answers has a larger influence on initial homework attempts than random guessing.

Gnlate?, Emre

2015-01-01T23:59:59.000Z

311

u.s. DEPARTl'..IENT OF ENERGY EERE PROJECT MANAGEM ENT CEN T  

Broader source: Energy.gov (indexed) [DOE]

No.1 to conduct preliminary engineering analyses in support of a project to harness hydroelectric power from the Everett, WA Reservoir 4 water transmission line. The Snohomish...

312

Chopwell Wood Health Project  

E-Print Network [OSTI]

Chopwell Wood Health Project An innovative project of school visits and General Practitioner. The project took place at Chopwell Wood a 360 hectare mixed woodland managed by the Forestry Commission to carry on being involved in the project. Next stage of the project Although the project leader has now

313

Project W-314 ax-b valve pit upgrade acceptance for beneficial use  

SciTech Connect (OSTI)

Program/Project Title: Project W-314, Tank Farm Restoration and Safe Operation, Phase I Component/System: SN-630 Transfer Line (AZ-02A to AN-B) September 15, 1997.

Warnick, T.L., Westinghouse Hanford, Richland, WA

1997-09-29T23:59:59.000Z

314

An Integrated RFID and Barcode Tagged Item Inventory System for Deployment at New Brunswick Laboratory  

SciTech Connect (OSTI)

New Brunswick Laboratory (NBL) has a numerous inventory containing thousands of plutonium and uranium certified reference materials. The current manual inventory process is well established but is a lengthy process which requires significant oversight and double checking to ensure correctness. Oak Ridge National Laboratory has worked with NBL to develop and deploy a new inventory system which utilizes handheld computers with barcode scanners and radio frequency identification (RFID) readers termed the Tagged Item Inventory System (TIIS). Certified reference materials are identified by labels which incorporate RFID tags and barcodes. The label printing process and RFID tag association process are integrated into the main desktop software application. Software on the handheld computers syncs with software on designated desktop machines and the NBL inventory database to provide a seamless inventory process. This process includes: 1) identifying items to be inventoried, 2) downloading the current inventory information to the handheld computer, 3) using the handheld to read item and location labels, and 4) syncing the handheld computer with a designated desktop machine to analyze the results, print reports, etc. The security of this inventory software has been a major concern. Designated roles linked to authenticated logins are used to control access to the desktop software while password protection and badge verification are used to control access to the handheld computers. The overall system design and deployment at NBL will be presented. The performance of the system will also be discussed with respect to a small piece of the overall inventory. Future work includes performing a full inventory at NBL with the Tagged Item Inventory System and comparing performance, cost, and radiation exposures to the current manual inventory process.

Younkin, James R [ORNL; Kuhn, Michael J [ORNL; Gradle, Colleen [New Brunswick Laboratory, Argonne, IL; Preston, Lynne [U.S. Department of Energy, Office of Health, Safety and Security; Thomas, Brigham B. [ORNL; Laymance, Leesa K [ORNL; Kuziel, Ron [DOE SC - Chicago Office

2012-01-01T23:59:59.000Z

315

Sustainability Project Fund Application Form Requirements Project Title  

E-Print Network [OSTI]

Sustainability Project Fund Application Form Requirements Project Title: Budget Requested: Applicant/Project Leader: Faculty/Department: Email: Daytime Phone: Project Team: (Please include. Project Overview Project summary: · Provide a brief background, describing the project, objectives

Volesky, Bohumil

316

Omega Transmission Lines  

E-Print Network [OSTI]

In this paper, we show how bi-anisotropic media with omega-type response can be realized using periodically loaded transmission lines. General conditions for the needed unit cell circuit block are derived. Also, an implementation is shown and analyzed.

Vehmas, Joni

2013-01-01T23:59:59.000Z

317

Line Density Indice as an alternative to MK process  

E-Print Network [OSTI]

73 broadband optical spectra of dwarf stars later than F0 have been obtained from the Nearby Stars Project website. The number of absorption lines is computed for each spectrum between 6000 and 6200 Angstrom. A correlation is found between the density of lines K$\\lambda$ and the spectral type. This method is independent of calibration process, does not require high resolution or high signal to noise data and does not make use of a large library of standard spectra.

M. Kuassivi

2009-12-31T23:59:59.000Z

318

Evaluation of Instrumentation and Dynamic Thermal Ratings for Overhead Lines  

SciTech Connect (OSTI)

In 2010, a project was initiated through a partnership between the Department of Energy (DOE) and the New York Power Authority (NYPA) to evaluate EPRI?s rating technology and instrumentation that can be used to monitor the thermal states of transmission lines and provide the required real-time data for real-time rating calculations. The project included the installation and maintenance of various instruments at three 230 kV line sites in northern New York. The instruments were monitored, and data collection and rating calculations were performed for about a three year period.

Phillips, A.

2013-01-31T23:59:59.000Z

319

Quality assurance program plan for cesium legacy project  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents.

Tanke, J.M.

1997-05-22T23:59:59.000Z

320

Second Line of Defense Spares Program  

SciTech Connect (OSTI)

During Fiscal Year 2012, a team from the Pacific Northwest National Laboratory (PNNL) conducted an assessment and analysis of the Second Line of Defense (SLD) Sustainability spare parts program. Spare parts management touches many aspects of the SLD Sustainability Program including contracting and integration of Local Maintenance Providers (LMP), equipment vendors, analyses and metrics on program performance, system state of health, and maintenance practices. Standardized spares management will provide better data for decisions during site transition phase and will facilitate transition to host country sustainability ownership. The effort was coordinated with related SLD Sustainability Program initiatives, including a configuration items baselining initiative, a metrics initiative, and a maintenance initiative. The spares study has also led to pilot programs for sourcing alternatives that include regional intermediate inventories and partnering agreements that leverage existing supply chains. Many partners from the SLD Sustainability program contributed to and were consulted in the course of the study. This document provides a description of the findings, recommendations, and implemented solutions that have resulted from the study.

Henderson, Dale L.; Holmes, Aimee E.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.; Thorsen, Darlene E.

2012-11-20T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Printed circuit dispersive transmission line  

DOE Patents [OSTI]

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

322

Wireless Sensor Network for Electric Transmission Line Monitoring  

SciTech Connect (OSTI)

Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization applications to deliver real-time information to federal agencies and others tasked with grid reliability (Tasks 6,8)

Alphenaar, Bruce

2009-06-30T23:59:59.000Z

323

Policy and procedures for classification of Class III groundwater at UMTRA Project sites. [Uranium Mill Tailings Remedial Action (UMTRA) Project  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) has recently proposed groundwater regulations for the US Department of Energy's )DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. These regulations allow the application of supplemental standards at UMTRA Project sites in specific situations. The designation of groundwater as Class III permits the application of supplemental standards. This document discusses a final UMTRA Project policy and procedures for identifying Class III groundwater, including identification of a review area, definition of water quality, quantification of aquifer yield, and identification of methods reasonably employed for public water supply systems. These items, either individually or collectively, need to be investigated in order to determine if groundwaters at UMTRA Project sites are Class III. This document provides a framework for the DOE to determine Class III groundwaters.

Not Available

1989-03-01T23:59:59.000Z

324

Evolution of project planning tools in a matrix organization  

SciTech Connect (OSTI)

Until recently, the Corporate Construction Program at Sandia was experiencing difficulties in managing projects: poor planning and cost estimating caused schedule and budget problems. The first step taken was a Microsoft {reg_sign} Project schedule that provides a standard template for scheduling individual construction projects. It is broken down according to the life cycle of the project and prevents the project team from leaving out an important item. A WBS (work breakdown structure) dictionary was also developed that describes how capital and operating funds are used to develop, design, construct, equip, and manage projects. We also developed a matrix chart that maps the planning guide against the major types of construction projects at Sandia. The guide, dictionary, and matrix chart offer enough flexibility that the project manager can make choices about how to structure work, yet ensure that all work rolls up to the cost categories and key DOE WBS elements. As requirements change, the tools can be updated; they also serve as training tools for new project team members.

Furaus, J.P.; Figueroa-McInteer, C.; McKeever, P.S.; Wisler, D.B. [Sandia National Labs., Albuquerque, NM (United States); Zavadil, J.T. [Infomatrix (United States)

1996-10-01T23:59:59.000Z

326

Mokken scale analysis of mental health and wellbeing questionnaire item responses: a nonparametric IRT method in empirical research for applied health researchers  

E-Print Network [OSTI]

potentially useful items are rejected because of the shape of their item response functions, with the result that other aspects of scale performance are likely to be compromised to some extent. For ex- ample, reliability estimated from the conforming items may... . No violations of the invariant item ordering requirement are present. We can therefore consider the results of this first ex- emplar Mokken scaling analysis as supportive of a GHQ-12 scale which, within each subscale, satisfies IIO and therefore both subscales...

Stochl, Jan; Jones, Peter B; Croudace, Tim J

2012-06-11T23:59:59.000Z

327

Environmental Assessment : Happy Valley [Substation Project].  

SciTech Connect (OSTI)

The proposed Happy Valley project consists of construction of a new BPA customer service 69-kV substation south of Sequim in Clallam County, Washington. A tie line, to be constructed by the customer as part of this project, will link the new BPA facility to the existing customer's transmission system in the area. This project responds to rapid load growth in the Olympic Peninsula, and will strengthen the existing BPA system and interconnected utility systems. It will reduce transmission losses presently incurred, especially on the BPA system supplying power to the Olympic Peninsula. This report describes the potential environmental impact of the proposed actions. 2 figs., 1 tab.

United States. Bonneville Power Administration.

1982-05-01T23:59:59.000Z

328

Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents.

HALL, L.R.

2000-02-01T23:59:59.000Z

329

EIS-0427: Grapevine Canyon Wind Project, Coconino County, Arizona  

Broader source: Energy.gov [DOE]

This EIS evaluates the environmental impacts of a proposed wind energy generation project in Coconino County, Arizona, on privately owned ranch lands and trust lands administered by the Arizona State Land Department. The proposed project includes a new transmission tie-line that would cross lands administered by Coconino National Forest and interconnect with DOEs Western Area Power Administrations existing Glen Canyon-Pinnacle Peak transmission lines.

330

PROJECT STRATEGY FOR THE REMEDIATION AND DISPOSITION OF LEGACY TRANSURANIC WASTE AT THE SAVANNAH RIVER SITE, South Carolina, USA  

SciTech Connect (OSTI)

This paper discusses the Savannah River Site Accelerated Transuranic (TRU) Waste Project that was initiated in April of 2009 to accelerate the disposition of remaining legacy transuranic waste at the site. An overview of the project execution strategy that was implemented is discussed along with the lessons learned, challenges and improvements to date associated with waste characterization, facility modifications, startup planning, and remediation activities. The legacy waste was generated from approximately 1970 through 1990 and originated both on site as well as at multiple US Department of Energy sites. Approximately two thirds of the waste was previously dispositioned from 2006 to 2008, with the remaining one third being the more hazardous waste due to its activity (curie content) and the plutonium isotope Pu-238 quantities in the waste. The project strategy is a phased approach beginning with the lower activity waste in existing facilities while upgrades are made to support remediation of the higher activity waste. Five waste remediation process lines will be used to support the full remediation efforts which involve receipt of the legacy waste container, removal of prohibited items, venting of containers, and resizing of contents to fit into current approved waste shipping containers. Modifications have been minimized to the extent possible to meet the accelerated goals and involve limited upgrades to address life safety requirements, radiological containment needs, and handling equipment for the larger waste containers. Upgrades are also in progress for implementation of the TRUPACT III for the shipment of Standard Large Boxes to the Waste Isolation Pilot Plant, the US TRU waste repository. The use of this larger shipping container is necessary for approximately 20% of the waste by volume due to limited size reduction capability. To date, approximately 25% of the waste has been dispositioned, and several improvements have been made to the overall processing plan as well as facility processing rates. These lessons learned, challenges, and improvements will be discussed to aid other sites in their efforts to conduct similar activities.

Rodriguez, M.

2010-12-17T23:59:59.000Z

331

River Protection Project information systems assessment  

SciTech Connect (OSTI)

The Information Systems Assessment Report documents the results from assessing the Project Hanford Management Contract (PHMC) Hanford Data Integrator 2000 (HANDI 2000) system, Business Management System (BMS) and Work Management System phases (WMS), with respect to the System Engineering Capability Assessment Model (CAM). The assessment was performed in accordance with the expectations stated in the fiscal year (FY) 1999 Performance Agreement 7.1.1, item (2) which reads, ''Provide an assessment report on the selected Integrated Information System by July 31, 1999.'' This report assesses the BMS and WMS as implemented and planned for the River Protection Project (RPP). The systems implementation is being performed under the PHMC HANDI 2000 information system project. The project began in FY 1998 with the BMS, proceeded in FY 1999 with the Master Equipment List portion of the WMS, and will continue the WMS implementation as funding provides. This report constitutes an interim quality assessment providing information necessary for planning RPP's information systems activities. To avoid confusion, HANDI 2000 will be used when referring to the entire system, encompassing both the BMS and WMS. A graphical depiction of the system is shown in Figure 2-1 of this report.

JOHNSON, A.L.

1999-07-28T23:59:59.000Z

332

Drill string transmission line  

DOE Patents [OSTI]

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

333

What is an Item Type in ISIS? The means by which every type of unique financial transaction is categorized in ISIS.  

E-Print Network [OSTI]

What is an Item Type in ISIS? The means by which every type of unique financial transaction is categorized in ISIS. If we need to report on a specific type of transaction, we need to create a unique item in the definition of a new item type in ISIS. 9/5/2006 #12;

Wisconsin at Madison, University of

334

EIS-0298: Telephone Flat Geothermal Development Project  

Broader source: Energy.gov [DOE]

This EIS is for a Plan of Operation (POO) for Development and Production; and for a POO for Utilization and Disposal for a proposed geothermal development project, including: a power plant, geothermal production and injection wellfield, ancillary facilities, and transmission line on the Modoc National Forest in Siskiyou and Modoc Counties, California.

335

Comparison of Bottom-Up and Top-Down Forecasts: Vision Industry Energy Forecasts with ITEMS and NEMS  

E-Print Network [OSTI]

Comparisons are made of energy forecasts using results from the Industrial module of the National Energy Modeling System (NEMS) and an industrial economic-engineering model called the Industrial Technology and Energy Modeling System (ITEMS), a model...

Roop, J. M.; Dahowski, R. T

336

On-Line ALARA Project Submittal Form to report ALARA Project Descriptions  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil's Impact on Our National Security Oil'sFunds forOn theto

337

Project Sponsor Professor Peter  

E-Print Network [OSTI]

Project Sponsor Professor Peter McGearoge Project Director Nicki Matthew Audit / Quality Mazars Architect IT ServicesProcess Owners Build Team Lead Nicki Matthew Project Manager ­ Unit4 Joe Cairney Student Lifecycle Project Board InfrastructureDBA's TBC TBC TBC Process 1 Process 2 Project Sponsor ­ Unit

Levi, Ran

338

Project Structure Elke Karrenberg  

E-Print Network [OSTI]

Project Structure Elke Karrenberg Project Manager, Head of Personnel Development Phone +49 6131 39-20634 Dr. Jana Leipold Project Staff, Personnel Development Consultant Phone +49 6131 39-25433 Antje Swietlik Project Staff Phone +49 6131 39-20140 Project Office JGU Leadership Forum Universitatis 3, Room 00

Kaus, Boris

339

EIS-0418: PrairieWinds Project, South Dakota  

Broader source: Energy.gov [DOE]

This EIS analyzes DOE's decision to approve the interconnection request from PrairieWinds for their South Dakota PrairieWinds Project, a 151.5-megawatt (MW) nameplate capacity wind powered generation facility, including 101 General Electric 1.5-MW wind turbine generators, electrical collector lines, collector substation, transmission line, communications system, and wind turbine service access roads.

340

Energy Efficiency in the Pulp and Paper Industry: Simulation of Steam Challenge and CHP Incentives with ITEMS  

E-Print Network [OSTI]

ENERGY EFFICIENCY IN THE PULP AND PAPER INDUSTRY: SIMULATION OF STEAM CHALLENGE AND CHP INCENTIVES WITH ITEMS Joseph M. Roop Staff Scientist Pacific Northwest National Laboratory Richland, Washington ABSTRACT# Two programs being.... This document number is PNNL-SA-29768. ? Referred to as ISTUM in (3). industry (here, we use the newer acronym CHP for" combined heat and power"). Our use of ITEMS demonstrates that such programs can be analyzed, and their effec tiveness assessed using...

Roop, J. M.

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Energy Strategic Planning & Sufficiency Project  

SciTech Connect (OSTI)

This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follows: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

Retziaff, Greg

2005-03-30T23:59:59.000Z

342

Uranium Neutron Coincidence Collar Model Utilizing Boron-10 Lined Tubes  

SciTech Connect (OSTI)

The Department of Energy Office of Nuclear Safeguards and Security (NA-241) is supporting the project Coincidence Counting With Boron-Based Alternative Neutron Detection Technology at Pacific Northwest National Laboratory (PNNL) for the development of a 3He proportional counter alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a system based upon 10B-lined proportional tubes in a configuration typical for 3He-based coincidence counter applications. This report, providing results for model development of Alternative Boron-Based Uranium Neutron Coincidence Collar (ABUNCL) designs, is a deliverable under Task 2 of the project.

Rogers, Jeremy L.; Ely, James H.; Kouzes, Richard T.; Lintereur, Azaree T.; Siciliano, Edward R.

2012-09-18T23:59:59.000Z

343

Part II: Project Summaries Project Summaries  

E-Print Network [OSTI]

Part II: Project Summaries Part II Project Summaries #12;22 Math & Computational Sciences Division generally cannot be achieved for reasonable computational cost. Applications that require modeling of this project is to advance the state of the art in electromagnetic computations by eliminating three existing

Perkins, Richard A.

344

CS348 Project 1 Oracle Project  

E-Print Network [OSTI]

CS348 Project 1 Oracle Project Due Date: 2/12/2009 You are going to use Oracle to design a simple; if nothing else, mark each query with its number. Turnin You may turn in the project for grading using the procedure described below. Run the following shell command (see 'man turnin' for details): turnin -c cs348

Elmagarmid, Ahmed K.

345

Project Name Project Number Tagging Type  

E-Print Network [OSTI]

Project Name Project Number Primary Tagging Type Secondary Tagging Type Fish Species Tagging/ Secondary Legal Driver (BiOp, MOA, Accord, etc.) Tagging Purpose Funded Entity Tagging Location Retrieval CWT Recovery Project 2010-036-00 CWT PIT Chinook, coho retrieval, analysis, address PSMFC sampling

346

project.m  

E-Print Network [OSTI]

function project(u,w) %last updated 5/9/94 %PROJECT Projecting vector U onto vector W orthogonally. Vectors % U and W can be either a pair of 2D or 3D...

347

Super Projects (Arkansas)  

Broader source: Energy.gov [DOE]

A 2004 amendment to the state constitution authorizes the state to attract super projects by issuing bonds to fund a projects infrastructure, limited to 5% of the net general revenues during the...

348

Project Selection - Record Keeping  

E-Print Network [OSTI]

4-H members have many project areas to choose from, depending on where they live. Members should consult with their parents and 4-H leaders when choosing a project. This publication outlines project considerations....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

349

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT NAME OF OFFEROR OR CONTRACTOR  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNational NuclearhasAdministration77Nuclear SecurityFAPAC-NMNRC 741No. M202I.ITEM

350

OFFICE OF CIVIL RIGHTS NA-1.2 VIDEO LIBRARY Item Title  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF CIVIL RIGHTS NA-1.2 VIDEO LIBRARY Item

351

EIS-0441: Mohave County Wind Farm Project, Mohave County, Arizona  

Broader source: Energy.gov [DOE]

This EIS, prepared by the Bureau of Land Management with DOEs Western Area Power Administration as a cooperating agency, evaluated the environmental impacts of a proposed wind energy project on public lands in Mohave County, Arizona. Power generated by this project would tie to the electrical power grid through an interconnection to one of Westerns transmission lines.

352

EIS-0390: Eastern Plains Transmission Project, Colorado and Kansas.  

Broader source: Energy.gov [DOE]

This EIS is for Western Area Power Administration's proposal to participate with Tri-State Generation and Transmission Association, Inc. (Tri-State), to construct the proposed Eastern Plains Transmission Project (Project). Westerns participation with Tri-State would be in exchange for capacity rights on the transmission lines.

353

National Synchrotron Light Source II Project Progress Report  

E-Print Network [OSTI]

Laboratory Upton, New York 11973 #12;NSLS-II PROJECT DIRECTOR'S ASSESSMENT JUNE 2010 2 OVERALL ASSESSMENT and schedule performances. Overall, the project is on schedule and on budget with no major technical issues production components such as vacuum chambers, girders, BPM and power supply parts, injector transfer lines

Ohta, Shigemi

354

Utility Lines and Facilities (Montana)  

Broader source: Energy.gov [DOE]

These regulations apply to the construction of utility and power lines and facilities. They address the use of public right-of-ways for such construction, underground power lines, and construction...

355

Falls Creek Hydroelectric Project  

SciTech Connect (OSTI)

This project was for planning and construction of a 700kW hydropower project on the Fall River near Gustavus, Alaska.

Gustavus Electric Company; Richard Levitt; DOE Project Officer - Keith Bennett

2007-06-12T23:59:59.000Z

356

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 274...

357

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Leafs Enrolled to Date EV Project Chevrolet Volts Enrolled to Date EV Project Smart Electric Drives Enrolled to Date Distance Driven (mi) Phoenix, AZ Metropolitan Area 259...

358

Project Risk Management:.  

E-Print Network [OSTI]

?? The recent increase in international projects has resulted in higher risk along with difficulties in control and coordination. Effective project management can therefore be (more)

Koelmeyer, Chris

2013-01-01T23:59:59.000Z

359

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1....

360

Project BETA Cover Page  

E-Print Network [OSTI]

and Distribution of the Project BETA articles were funded inproduct is discussed in the BETA articles. Western JournalProject BETA: Best practices in Evaluation and Treatment of

Cover Page, Project BETA

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Report Project to date through March 2013 Charging Infrastructure Region Number of EV Project Charging Units Installed To Date Number of Charging Events Performed Electricity...

362

Project Finance and Investments  

Broader source: Energy.gov [DOE]

Plenary III: Project Finance and Investment Project Finance and Investments Chris Cassidy, National Business Renewable Energy Advisor, U.S. Department of Agriculture

363

Clean Coal Projects (Virginia)  

Broader source: Energy.gov [DOE]

This legislation directs the Virginia Air Pollution Control Board to facilitate the construction and implementation of clean coal projects by expediting the permitting process for such projects.

364

Coronal emission lines as thermometers  

E-Print Network [OSTI]

Coronal emission line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G

2009-01-01T23:59:59.000Z

365

Lumped Model of Transmission Line In the Instrumentation Studio, we use both a coil of coax (around 80-100 meters long)  

E-Print Network [OSTI]

Lumped Model of Transmission Line In the Instrumentation Studio, we use both a coil of coax (around 80-100 meters long) and an equivalent lumped model of the coil of coax to study transmission lines.7 Ideal Transmission Line Frequency Volts respectively. In Project 2 (Spring 2000) we use the lumped line

Lü, James Jian-Qiang

366

Is planning failing? : the impacts of decision making processes on the Green Line Extension  

E-Print Network [OSTI]

Research was conducted on the proposed Green Line Extension, a light rail corridor from Cambridge through Somerville and Medford, Massachusetts. The project is being undertaken by the Massachusetts Executive Office of ...

Ciborowski, Matthew A

2009-01-01T23:59:59.000Z

367

SunLine Expands Horizons with Fuel Cell Bus Demo. Hydrogen, Fuel...  

Broader source: Energy.gov (indexed) [DOE]

SunLine. NRELPIX 14396 NRELPIX 14395 FUEL CELL BUS DEMONSTRATION PROJECTS Hydrogen, Fuel Cells & Infrastructure Technologies program F U E L C E L L B U S D E M o N S T R A T I...

368

Global Radiological Source Sorting, Tracking, and Monitoring Project: Phase I Final Report  

SciTech Connect (OSTI)

As a proof of concept tested in an operational context, the Global Radiological Source Sorting, Tracking, and Monitoring (GRadSSTraM) Project successfully demonstrated that radio frequency identification (RFID) and Web 2.0* technologies can be deployed to track controlled shipments between the United States and the European Union. Between November 2009 and May 2010, a total of 19 shipments were successfully shipped from Oak Ridge National Laboratory (ORNL) by the U.S. Postal Service (USPS) and tracked to their delivery at England's National Physical Laboratory (NPL) by the United Kingdom Royal Mail. However, the project can only be viewed as a qualified success as notable shortcomings were observed. Although the origin and terminus of all RFID-enabled shipments were recorded and no shipments were lost, not all the waypoints between ORNL and NPL were incorporated into the pilot. Given limited resources, the project team was able to install RFID listeners/actuators at three waypoints between the two endpoints. Although it is likely that all shipments followed the same route between ORNL and NPL, it cannot be determined beyond question that all 19 shipments were routed on identical itineraries past the same three waypoints. The pilot also raises the distinct possibility that unattended RFID tracking alone, without positive confirmation that a tagged item has been properly recorded by an RFID reader, does not meet a rigorous standard for shipping controlled items. Indeed, the proof of concept test strongly suggests that a multifaceted approach to tracking may be called for, including tracking methods that are capable of reading and accepting multiple inputs for individual items [e.g., carrier-provided tracking numbers, Universal Product Codes (UPCs), and RFID tags]. For controlled items, another apparent requirement is a confirmation feature, human or otherwise, which can certify that an item's RFID tag, UPC, or tracking number has been recorded.

Walker, Randy M [ORNL; Hill, David E [ORNL; Gorman, Bryan L [ORNL

2010-09-01T23:59:59.000Z

369

Thailand gas project now operational  

SciTech Connect (OSTI)

Now operational, Phase 1 of Thailand's first major natural gas system comprises one of the world's longest (264 miles) offshore gas lines. Built for the Petroleum Authority of Thailand (PTT), this system delivers gas from the Erawan field in the Gulf of Thailand to two electrical power plants near Bangkok, operated by the Electricity Generating Authority of Thailand (EGAT). The project required laying about 360 miles of pipeline, 34-in., 0.625 in.-thick API-5LX-60 pipe offshore and 28-in., 0.406 in.-thick API-5LX-60 onshore. The offshore pipe received a coal-tar coating, a 3.5-5.0 in. concrete coating, and zinc sacrificial-anode bracelets. The onshore line was coated with the same coal-tar enamel and, where necessary, with concrete up to 4.5 in. thick. Because EGAT's two power plants are the system's only customers, no more pipeline will be constructed until deliveries, currently averaging about 100 million CF/day, reach the 250 million CF/day level. The project's second phase will include additional pipelines as well as an onshore distribution network to industrial customers.

Horner, C.

1982-08-01T23:59:59.000Z

370

Ultracomputer Research Project  

SciTech Connect (OSTI)

This document presents significant accomplishments made on the Ultracomputer Research Project during CY92.

Gottlieb, A.

1992-10-01T23:59:59.000Z

371

Evaluation of Project Achievements in VOMARE -project.  

E-Print Network [OSTI]

??The purpose of the thesis is to study the achievements of VOMARE project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation (more)

Kokkarinen, Eeva

2011-01-01T23:59:59.000Z

372

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Broader source: Energy.gov (indexed) [DOE]

Pollutants? NEPA COMPLIANCE SURVEY Is the project subject to emissions limitations In an Air 0 81 0 Quality Control Region? Impacts If YES, then complete below. Anticipated?...

373

Project Registration Number Assignments (Active) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21,-CommitteeItemsHiTek logo HiTekActive) Project

374

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 1 October 6, 2011 Submitted by: R. Strykowsky NSTX Upgrade Project Manager _____________________________ M. Williams Associate Director, PPPL

Princeton Plasma Physics Laboratory

375

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan National Spherical Torus Experiment (NSTX) Upgrade Project Execution Plan Revision 3 October 12, 2012 Administrative Change Submitted by: ______________________________ R. Strykowsky NSTX Upgrade Project Manager Anthony Indelicato

Princeton Plasma Physics Laboratory

376

A unique radioisotopic label as a new concept for safeguarding and tagging of long-term stored items and waste  

E-Print Network [OSTI]

The present paper discuss a novel method of tagging and labeling of waste casks, copper canisters, spent fuel containers, mercury containers, waste pack- ages and other items. In particular, it is related to the development of new long-term security identification tags/labels that can be applied to articles for carrying information about the content, inventory tracking, prevention of falsifi- cation and theft etc. It is suggested to use a unique combination of radioisotopes with different predictable length of life, as a label of the items. The possibil- ity to realize a multidimensional bar code symbology is proposed as an option for a new labeling method. The results of the first tests and evaluations of this are shown and discussed in the paper. The invention is suitable for use in items assigned to long-term (hundreds of years) storing or for final repositories. Alternative field of use includes fresh nuclear fuel handling and shipment of goods.

Dina Chernikova; Kare Axell

2015-01-15T23:59:59.000Z

377

Senior projectS corporate Sponsored  

E-Print Network [OSTI]

--Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

Stuart, Josh

378

Project Description: page 1 Project Description  

E-Print Network [OSTI]

Project Description: page 1 Project Description I. Introduction: Josephson junction networks Over the past 25 years, superconducting Josephson junctions have gradually become one of the major topics standards. Our research uses Josephson junctions as model systems for problems in nonlinear and neural

Segall, Ken

379

Livingston Campus Geothermal Project The Project  

E-Print Network [OSTI]

Livingston Campus Geothermal Project The Project: Geothermal power is a cost effective, reliable is a Closed Loop Geothermal System involving the removal and storage of approximately four feet of dirt from the entire Geothermal Field and the boring of 321 vertical holes reaching a depth of 500 feet. These holes

Delgado, Mauricio

380

Bipolar pulse forming line  

DOE Patents [OSTI]

A bipolar pulse forming transmission line module for linear induction accelerators having first, second, third, fourth, and fifth planar conductors which form an interleaved stack with dielectric layers between the conductors. Each conductor has a first end, and a second end adjacent an acceleration axis. The first and second planar conductors are connected to each other at the second ends, the fourth and fifth planar conductors are connected to each other at the second ends, and the first and fifth planar conductors are connected to each other at the first ends via a shorting plate adjacent the first ends. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short a high voltage from the first end of the third planar conductor to the first end of the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

Rhodes, Mark A. (Pleasanton, CA)

2008-10-21T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

EA-1972: Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona  

Broader source: Energy.gov [DOE]

Western Area Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of a 35.6-mile transmission line that Western operates and maintains under an agreement with the Central Arizona Project. Additional information is available on the project website, http://www.wapa.gov/dsw/environment/ED2DOEEA1972.htm.

382

1 Dotted line for IT infrastructure and policies 2 Joint ITS/SOM appointment  

E-Print Network [OSTI]

Services Reba Brindley Project Management Transition Projects Barbara Maher Jesse Anderson Desktop to Customer Relationship Management Group 7 Dotted line to Opinder Bawa; direct reporting to home departments Phillips Teresa Regalia (3 vacant) Kevin Dale Identity Management Elliot Kendall (term) Andrei Mattes Mark

Derisi, Joseph

383

NETL LINES OF DEMARCATION 09282012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

LINES OF DEMARCATION September 28, 2012 Contact: Site Operations Division or ESS&H Division with Questions The oversight, upkeep, and segregation of NETL infrastructure components,...

384

ENGI 4421 Term Test 2 -2014 07 07 Page 1 of 2 1. The defect rate among items emerging from an assembly line is known to be 3%.  

E-Print Network [OSTI]

the concentration of an impurity in a large batch of [10] lubricating oil. A random sample of 3 cm3 of oil is taken

George, Glyn

385

11. THIS ITEM APPLIES TO AMENDMENTS OF SOLICITATIONS D The above numbered solicitationis amended as set forth in Item 14. The hour and dale specified for receipt of Offers 0 is extended. D is not extended.  

E-Print Network [OSTI]

(REV. 10-83) Prescribed by GSA FAR (48 CFR) 53.243 AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT as provided herein. at!tenns and conditions of the document referenced in Item 9Aor 10A.as heretofore changed Division Richland, Benton County, WA 99352 10A.MODIFICATIONOFCONTRACTIORDERNO. DE-ACO76RL01830 DUNS

386

Contract/Project Management  

Broader source: Energy.gov (indexed) [DOE]

and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast FY 2012 Pre- & Post-CAP Forecast Comment Capital Asset Project Success: Complete 90%...

387

Contract/Project Management  

Energy Savers [EERE]

on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre-...

388

Rank Project Name Directorate,  

E-Print Network [OSTI]

Rank Project Name Directorate, Dept/Div and POC Cost Savings Payback (Years) Waste Reduction 1 NATIONAL LABORATORY FY02 Funded Pollution Prevention Projects 0.4 Years (~5 months) #12;

389

The 4-H Project  

E-Print Network [OSTI]

As a 4-H volunteer, you will find that projects are useful tools for teaching a wide variety of skills to young people. This publication will help you plan and evaluate 4-H learning projects....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

390

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1 approved 1-16-2013.

2012-12-03T23:59:59.000Z

391

Planning the Project Meeting  

E-Print Network [OSTI]

Project group meetings must be planned well in advance. Members should be involved in completing some type of work before the next meeting. This helps the leader plan the next project meeting and makes efficient use of time....

Howard, Jeff W.

2005-05-10T23:59:59.000Z

392

Information Technology Project Management  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order provides program and project management direction for the acquisition and management of IT projects, investments, and initiatives. Cancels DOE G 200.1-1. Admin Chg 1, dated 1-16-2013, cancels DOE O 415.1.

2012-12-03T23:59:59.000Z

393

Page 1 of 26 INDEPENDENT PROJECT  

E-Print Network [OSTI]

Page 1 of 26 INDEPENDENT PROJECT EVALUATION PROJECT NAME: HIVE PROOF-OF- CONCEPT PROJECT PROJECT ............................................................................................................................................3 The Project..............................................................................................................................................3 Project Objectives and Achievements

Evans, Paul

394

DOCKET: A-98-49 Item: II-B1-27  

E-Print Network [OSTI]

Release DBDSP Delaware Basin Drilling Surveillance Program DM-TPC Dark Matter Time Projection Chamber DOE of Water per Day CARD Compliance Application Review Document CCA Compliance Certification Application CCDF

395

[ ]April 2013 Thickness is currently a pay item for portland cement concrete (PCC) pavements  

E-Print Network [OSTI]

, such as the nuclear density gauge for HMA roadway density or compression testing of cast cylinders for PCC roadway frequency at earlier ages. The research results can be easily implemented on PCC and HMA paving projects. 13

Harms, Kyle E.

396

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii Table of Contents 1 ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

397

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record/schedule baseline updates #12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan ii ..............................................................................................................................1 1.2.1 DOE-approved project documents

Princeton Plasma Physics Laboratory

398

Griffith Energy Project Final Environmental Impact Statement  

SciTech Connect (OSTI)

Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

N /A

1999-04-02T23:59:59.000Z

399

EA-1581: Sand Hills Wind Project, Wyoming  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with DOEs Western Area Power Administration as a cooperating agency, was preparing this EA to evaluate the environmental impacts of a proposal to construct, operate, and maintain the Sand Hills Wind Energy Facility on private and federal lands in Albany County, Wyoming. If the proposed action had been implemented, Western would have interconnected the proposed facility to an existing transmission line. This project has been canceled.

400

WIPP Projects Interative Map  

Broader source: Energy.gov [DOE]

View WIPP Projects in a larger map. To report corrections, please emailWeatherizationInnovation@ee.doe.gov.

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

GHPsRUS Project  

DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

402

GHPsRUS Project  

SciTech Connect (OSTI)

The GHPsRUS Project's full name is "Measuring the Costs and Benefits of Nationwide Geothermal Heat Pump Deployment." The dataset contains employment and installation price data collected by four economic surveys: (1)GHPsRUS Project Manufacturer & OEM Survey, (2) GHPsRUS Project Geothermal Loop Survey, (3) GHPsRUS Project Mechanical Equipment Installation Survey, and (4) GHPsRUS Geothermal Heat Pump Industry Survey

Battocletti, Liz

2013-07-09T23:59:59.000Z

403

Project: BELLA Bldg. #: 71  

E-Print Network [OSTI]

: BEVATRON Bldg. #: 51 Affected Area: Lot I (6) Lower Lot (52) Dates: 6/2009 - 11/2011 Project: Seismic PhaseProject: BELLA Bldg. #: 71 Affected Area: Lot M-1(12) B81 (18) Dates: 10/2010 ­ 10/2011 Project II Bldg. #: 74 Affected Area: U1 (50) U3 (21) Dates: 10/2009 ­ 4/2012 Project: Old Town Demo Bldg

404

Fundamental Aeronautics Hypersonics Project  

E-Print Network [OSTI]

Fundamental Aeronautics Hypersonics Project Reference Document Principal Investigator: James and detailed content of a comprehensive Fundamental Aeronautics Hypersonics research project. It contains) Hypersonic Project is based on the fact that all access to earth or planetary orbit, and all entry into earth

405

Project Website Information Architecture  

E-Print Network [OSTI]

Project Website Information Architecture Overview Purpose: To describe up front what your initiative/project does. This section does not need to literally be called "Overview;" you can come up with anther suitable title that is more specific to your project. Examples of what to include: Information

406

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

) CMGT 111 Construction Materials & Methods Lab (1) CMGT 460 Project Cost Controls (3) FA SP CMGT 320 FASYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro) CMGT 475 Construction Project Management (3) MATH 108 College Algebra (4) Construction Elective

Barrash, Warren

407

Project Scheduling (3) Corequisite  

E-Print Network [OSTI]

460 Project Cost Controls (3) FA SP FA CE 210/211 Surveying & Lab (3) CMGT 410 Concrete FormworkSYMBOLS CMGT 417 Project Scheduling (3) Corequisite Offered FALL Only CMGT 240 Intro Construction Project Management (3) MATH 108 College Algebra (4) MGMT 301 Leadership Skills (3) ENGL 101

Barrash, Warren

408

New Project Opportunities  

E-Print Network [OSTI]

/year. Most projects will be sponsored by between four and ten companies. The cost of participation may changeNew Project Opportunities PIMS: Porphyry Indicator Minerals The characteristics and relative, the next phase of this project has started and MDRU are looking for industry partners. Exploring Lithocaps

Michelson, David G.

409

Kansas Advanced Semiconductor Project  

SciTech Connect (OSTI)

KASP (Kansas Advanced Semiconductor Project) completed the new Layer 0 upgrade for D0, assumed key electronics projects for the US CMS project, finished important new physics measurements with the D0 experiment at Fermilab, made substantial contributions to detector studies for the proposed e+e- international linear collider (ILC), and advanced key initiatives in non-accelerator-based neutrino physics.

Baringer, P.; Bean, A.; Bolton, T.; Horton-Smith, G.; Maravin, Y.; Ratra, B.; Stanton, N.; von Toerne, E.; Wilson, G.

2007-09-21T23:59:59.000Z

410

Product Guide Project Standard and Project Professional  

E-Print Network [OSTI]

................................................................................................................................................................6 Manage Projects and Programs, or other intellectual property that are the subject matter of this document. #12;Table of Contents .......................................................................................................9 Make It Yours ­ Personalize the Ribbon

Narasayya, Vivek

411

Project Overload in Project Based Organizations - Causes, Symptoms and Effects.  

E-Print Network [OSTI]

?? This study investigates the matter of project overload which project members have to face in project based organizations. The thesis is based on 13 (more)

Hochdorfer, Tobias

2007-01-01T23:59:59.000Z

412

Salt repository project closeout status report  

SciTech Connect (OSTI)

This report provides an overview of the scope and status of the US Department of Energy (DOE`s) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs.

NONE

1988-06-01T23:59:59.000Z

413

Redshifts of Emission Line Objects in the Hubble Ultra Deep Field  

E-Print Network [OSTI]

We present redshifts for 115 emission line objects in the Hubble Ultra Deep Field (HUDF) identified through the GRism ACS Program for Extragalactic Science (GRAPES) project using the slitless grism spectroscopy mode of the ACS Camera on the Hubble Space Telescope (HST). The sample was selected by an emission line search on all extracted 1-dimensional GRAPES spectra. We identify the emission lines using line wavelength ratios where multiple lines are detected in the grism wavelength range (5800A 25 mag). Such emission lines would likely remain undiscovered without our deep survey. The emission line objects fall into 3 categories: 1) Most are low to moderate redshift galaxies (0 star forming galaxies with strong HII regions; 2) 9 are high redshift (4 < z < 7) Lyman-alpha emitters; and 3) at least 3 are candidate AGNs.

Chun Xu; Norbert Pirzkal; Sangeeta Malhotra; James E. Rhoads; Bahram Mobasher; Emanuele Daddi; Caryl Gronwall; Nimish P. Hathi; Nino Panagia; Henry C. Ferguson; Anton M. Koekemoer; Martin Kuemmel; Leonidas A. Moustakas; Anna Pasquali; Sperello di Serego Alighieri; Joel Vernet; Jeremy R. Walsh; Rogier Windhorst; Haojing Yan

2007-01-30T23:59:59.000Z

414

http://www.uab.edu/news/latest/item/3610-new-study-says-exercise-can-reduce-stroke-risk  

E-Print Network [OSTI]

http://www.uab.edu/news/latest/item/3610-new-study-says- exercise-can-reduce-stroke-risk http- lationship between exercise and stroke in a large biracial group of men and women in the United States. A total of 27,000 stroke- free blacks and whites ages 45 and older participated in the study. The results

Alpay, S. Pamir

415

Frequent Item Computation on a Chip Jens Teubner, Member, IEEE, Rene Mueller, Member, IEEE, and Gustavo Alonso, Member, IEEE  

E-Print Network [OSTI]

with modern CPU architectures are well known: high power consump- tion, heat dissipation, network bottlenecks (network- CPU, disk-CPU) to reduce the load and amount of data that hits the CPU [3]. What makes FPGAs operation, the calculation of frequent items in a data collection, and show how it can be implemented using

Teubner, Jens

416

Item #3 RMP Study # 1 Page 1 of 5 SS Dioxins in sport fish, bird eggs, surface sediments and tributaries  

E-Print Network [OSTI]

Item #3 RMP Study # 1 Page 1 of 5 SS Dioxins in sport fish, bird eggs, surface sediments and tributaries PS/SS: 2012 Dioxins Studies: Sport Fish, Bird Eggs, Surface Sediment, and Tributary Waters Estimated Cost: $119,470 Oversight Group: Dioxin Strategy Work Group Proposed by: Susan Klosterhaus and Don

417

Inventory Theory "Sorry, we're out of that item." How often have you heard that during shopping trips? In  

E-Print Network [OSTI]

935 19 Inventory Theory "Sorry, we're out of that item." How often have you heard that during job of managing their inventories (stocks of goods being held for future use or sale). They aren't placing orders to replenish inventories soon enough to avoid shortages. These stores could benefit from

Andreani, Roberto

418

410 BULLETIN OF THE UNITED STATES FISH COMMISSION. The closing item of this correspondence was by Professor Baird, who,  

E-Print Network [OSTI]

attribute to the great quantity of crabs found there. I have h v a y s observed that bass fishing was best fish. The absence or the presence of menhaden on the coast does not affect the bass fishery, except410 BULLETIN OF THE UNITED STATES FISH COMMISSION. The closing item of this correspondence

419

Renewable Energy Project Refinement Webinar  

Broader source: Energy.gov [DOE]

Attendees will become familiar with the three components of project refinement: project financing strategies, off-taker agreements, and vendor selection. Project refinement obstacles, particularly...

420

RENOTER Project | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

RENOTER Project RENOTER Project Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE...

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

FEDIX on-line information service: Design, develop, test, and implement, an on-line research and education information service. Annual status report, March 1, 1991--February 29, 1992  

SciTech Connect (OSTI)

The FEDIX Annual Status Report provides details regarding an on-line information project designed, developed and implemented by Federal Information Exchange, Inc., a diversified information services company. This document details the project design activities, summarizes the developmental phases of the project and describes the implementation activities generated to fulfill the project`s objectives. The information contained in this document illustrates FIE`s continuing commitment to serve as the link that facilitates the dissemination of federal information to the education community. This report reviews the project accomplishments and describes intended service enhancements.

Rodman, J.A.

1992-06-01T23:59:59.000Z

422

Electrical transmission line diametrical retainer  

DOE Patents [OSTI]

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

423

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

424

Pulse shaping with transmission lines  

DOE Patents [OSTI]

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, R.B.

1985-08-15T23:59:59.000Z

425

BEACON SOLAR ENERGY PROJECT (08-AFC-2) Project Title: Beacon Solar Energy Project (Beacon)  

E-Print Network [OSTI]

BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Project Title: Beacon Solar Energy Project and operate the Beacon Solar Energy Project (Beacon). Location: The project is located in eastern Kern County;BEACON SOLAR ENERGY PROJECT (08-AFC-2) FACT SHEET Licensing: The Beacon project would have a nominal

426

Simnple, portable, 3-D projection routine  

SciTech Connect (OSTI)

A 3-D projection routine is presented for use in computer graphics applications. The routine is simple enough to be considered portable, and easily modified for special problems. There is often the need to draw three-dimensional objects on a two-dimensional plotting surface. For the object to appear realistic, perspective effects must be included that allow near objects to appear larger than distant objects. Several 3-D projection routines are commercially available, but they are proprietary, not portable, and not easily changed by the user. Most are restricted to surfaces that are functions of two variables. This makes them unsuitable for viewing physical objects such as accelerator prototypes or propagating beams. This report develops a very simple algorithm for 3-D projections; the core routine is only 39 FORTRAN lines long. It can be easily modified for special problems. Software dependent calls are confined to simple drivers that can be exchanged when different plotting software packages are used.

Wagner, J.S.

1987-04-01T23:59:59.000Z

427

National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT  

E-Print Network [OSTI]

National Compact Stellarator Experiment Project Closeout Report i PROJECT CLOSEOUT REPORT NATIONAL of Science Princeton Plasma Physics Laboratory Oak Ridge National Laboratory #12;National Compact Stellarator Experiment Project Closeout Report PROJECT CLOSEOUT REPORT NATIONAL COMPACT STELLARATOR EXPERIMENT (NCSX

Princeton Plasma Physics Laboratory

428

Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description  

SciTech Connect (OSTI)

This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also.

Womack, J.C. [Westinghouse Hanford Co., Richland, WA (United States); Cramond, R. [TRW (United States); Paedon, R.J. [SAIC (United States)] [and others

1995-03-13T23:59:59.000Z

429

10-MWe solar-thermal central-receiver pilot plant, solar-facilities design integration: plant-support subsystem procurement documentation (RADL Item 7-44D)  

SciTech Connect (OSTI)

Purchase specifications are given for the specific long lead items to be procured for the 10 MWe Solar Pilot Plant. The hardware is grouped into two categories: 480 Volt Load Center and 480 Volt Motor Control Centers; and Power, Control and Instrumentation Cable. The purchase orders for each procurement are included. Need dates for each item are identified. (LEW)

Not Available

1980-09-01T23:59:59.000Z

430

Africa planned gas lines will meet future demand  

SciTech Connect (OSTI)

The burgeoning European market for natural gas is expected to create major gas line construction. The potential for North Africa looks particularly promising in 1991. Italy's ENI has proposed a 6,000-km (3,728-mi) gas network in North Africa to connect gas-rich Libya and Algeria with Morocco and Mauritania, making large volumes available to the European market. According to the proposal, a gas line would run from the Sirte Basin in Libya west to Mauritania. Extending the line eastward through Egypt and on to the Arabian Peninsula would provide export access. In this paper initial studies are examine reserve projections for the next 20 years, then based on results, a transmission/distribution network will be designed, including an offshore gathering system.

Not Available

1991-11-01T23:59:59.000Z

431

Authorization of Line Extension (Nebraska)  

Broader source: Energy.gov [DOE]

Any entity permitted to establish an electric light and power plant, and/or transmission or distribution lines within a city, village, or public electric light and power district, may also extend...

432

Transmission Lines Emulating Moving Media  

E-Print Network [OSTI]

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

433

New protection method for HVDC lines including cables  

SciTech Connect (OSTI)

For the third project of the Hokkaido-Honshu HVDC Link in Japan, called the HVDC Link III project (rated at 250 kVdc-1,200 A-300 MW), the authors developed an HVDC transmission line protection method based on a new working principle that allows high-speed and highly sensitive detection of faults, enhancing reliability in the supply of electric power. In general, increasing the sensitivity of relays will lead to an increased likelihood of undesired operation whereas lowering the sensitivity will impair the responsiveness of the relays. The proposed method meets these apparently incompatible requirements very well. Basically classified as a differential scheme, the HVDC transmission line protection method compensates for a charging and discharging current that flows through the line-to-ground capacitance at times of voltage variations caused by a line fault or by the operation of dc power systems. The developed protection method is also characterized in that it uses current changes induced by voltage variations to restrain the operation of a relay. This configuration has made the proposed method far superior in responsiveness and sensitivity to the conventional protection method. A simulation using an EMTP (Electro-Magnetic Transients Program) was conducted on this method. Developed relay equipment embodying the new protection method was subjected to various verification tests, where this equipment was connected to a power system simulator, before being delivered to the HVDC Link III facility.

Takeda, H.; Ayakawa, H.; Tsumenaga, N.; Sanpei, M.

1995-10-01T23:59:59.000Z

434

NSTX Upgrade Project Execution Plan NSTX Upgrade Project  

E-Print Network [OSTI]

#12;NSTX Upgrade Project Execution Plan NSTX Upgrade Project Project Execution Plan i Record 10/12/2012 Update to WBS Level 2 Threshold (top of page 20), Change DOE Federal Project Director and Deputy Federal Project Director. Various OBS changes. #12;NSTX Upgrade Project Execution Plan NSTX

Princeton Plasma Physics Laboratory

435

Analysis of interconnect microstrip lines  

E-Print Network [OSTI]

of the return loss of the slot-coupled microstrip dipole. Section C presents two simulations of the return loss on the slot- coupled rectangular patch antenna. A. Interconnect of Microstrip Lines Several circuits with the geometry of Figure 1 were fabricated.... Experimental and Theoretical Results of the Interconnect Two circuits were designed and fabricated. Each circuit consists of two substrates as shown in Figure 9. One substrate has an open microstrip line etched in one side and an aperture etched...

Luong, Giam-Minh

1992-01-01T23:59:59.000Z

436

Fin-line horn antenna  

DOE Patents [OSTI]

A fin line circuit card containing a fin line slot feeds a dipole antenna ich extends a quarterwave outside the waveguide and provides an energy beam focal point at or near the open end of the waveguide. The dipole antenna thus maintains a wide and nearly constant beamwidth, low VSWR and a circular symmetric radiation pattern for use in electronic warfare direction finding and surveillance applications.

Reindel, John (San Diego, CA)

1990-01-01T23:59:59.000Z

437

The CHPRC Columbia River Protection Project Quality Assurance Project Plan  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

Fix, N. J.

2008-11-30T23:59:59.000Z

438

Battleground Energy Recovery Project  

SciTech Connect (OSTI)

In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and ? Create a Showcase Waste Heat Recovery Demonstration Project.

Daniel Bullock

2011-12-31T23:59:59.000Z

439

Final Report - Navajo Electrification Demonstration Project - FY2004  

SciTech Connect (OSTI)

The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

Kenneth L. Craig, Interim General Manager

2007-03-31T23:59:59.000Z

440

Fusion Plasma Theory project summaries  

SciTech Connect (OSTI)

This Project Summary book is a published compilation consisting of short descriptions of each project supported by the Fusion Plasma Theory and Computing Group of the Advanced Physics and Technology Division of the Department of Energy, Office of Fusion Energy. The summaries contained in this volume were written by the individual contractors with minimal editing by the Office of Fusion Energy. Previous summaries were published in February of 1982 and December of 1987. The Plasma Theory program is responsible for the development of concepts and models that describe and predict the behavior of a magnetically confined plasma. Emphasis is given to the modelling and understanding of the processes controlling transport of energy and particles in a toroidal plasma and supporting the design of the International Thermonuclear Experimental Reactor (ITER). A tokamak transport initiative was begun in 1989 to improve understanding of how energy and particles are lost from the plasma by mechanisms that transport them across field lines. The Plasma Theory program has actively-participated in this initiative. Recently, increased attention has been given to issues of importance to the proposed Tokamak Physics Experiment (TPX). Particular attention has been paid to containment and thermalization of fast alpha particles produced in a burning fusion plasma as well as control of sawteeth, current drive, impurity control, and design of improved auxiliary heating. In addition, general models of plasma behavior are developed from physics features common to different confinement geometries. This work uses both analytical and numerical techniques. The Fusion Theory program supports research projects at US government laboratories, universities and industrial contractors. Its support of theoretical work at universities contributes to the office of Fusion Energy mission of training scientific manpower for the US Fusion Energy Program.

Not Available

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Operational Waste Volume Projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

STRODE, J.N.

2000-08-28T23:59:59.000Z

442

Operational waste volume projection  

SciTech Connect (OSTI)

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

Koreski, G.M.

1996-09-20T23:59:59.000Z

443

Investor Confidence Project  

E-Print Network [OSTI]

projects (under $1MM), Lighter engineering requirements V1 Released September 2013 Targeted Commercial Single Measure or Non-Interactive Retrofits Release Date Dec 2013 Multifamily Release Q1 2014 Quality Assurance Protocol Currently in BETA...Environmental Defense Funds Investor Confidence Project Delivering Investment Quality Energy Efficiency to Market ESL-KT-13-12-38 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Investor Confidence Project...

Golden, M.

2013-01-01T23:59:59.000Z

444

TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 2 DF WASTE LINE REMOVAL, BNL  

SciTech Connect (OSTI)

5098-SR-02-0 PROJECT-SPECIFIC TYPE A VERIFICATION FOR THE HIGH FLUX BEAM REACTOR UNDERGROUND UTILITIES REMOVAL PHASE 2 DF WASTE LINE REMOVAL, BROOKHAVEN NATIONAL LABORATORY

P.C. Weaver

2010-07-09T23:59:59.000Z

445

Lompoc City Council Agenda Item City Council Meeting Date: October 15, 2013  

E-Print Network [OSTI]

, and 2020, respectively. Renewable energy generation includes solar, geothermal, small hydroelectric in Northern California Power Agency ("NCPA") geothermal generation projects and small #12;October 15, 2013 2012 2013 2014 2015 2016 2017 2018 2019 2020 Lompoc % Capacity Energy Energy Energy Energy Energy

446

Project Finance Case Studies  

Broader source: Energy.gov [DOE]

Presentation covers the Project Finance Case Studies and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Rapid City, South Dakota.

447

Prison Solar Project  

Broader source: Energy.gov [DOE]

Presentation covers the Prison Solar Project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

448

Recovery Act Project Stories  

Broader source: Energy.gov [DOE]

Funded by the American Recovery and Reinvestment Act, these Federal Energy Management Program (FEMP) projects exemplify the range of technical assistance provided to federal agencies.

449

Barstow Wind Turbine Project  

Broader source: Energy.gov [DOE]

Presentation covers the Barstow Wind Turbine project for the Federal Utility Partnership Working Group (FUPWG) meeting, held on November 18-19, 2009.

450

TThe {\\sc Majorana} Project  

E-Print Network [OSTI]

The {\\sc Majorana} Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

The MAJORANA collaboration

2009-10-23T23:59:59.000Z

451

Dispersion Modeling Project  

Broader source: Energy.gov (indexed) [DOE]

Dispersion Modeling Project Nuclear & Criticality Safety Engineering Andrew Vincent Germantown, MD DOE Workshop Savannah River Nuclear Solutions, LLC June, 2012 SRNS-...

452

EV Project Overview Report  

Broader source: Energy.gov (indexed) [DOE]

Greater Seattle and Olympia Metropolitan Areas Vehicle enrollment numbers refer to the EV Project only. Numbers do not reflect total regional or national vehicles sales or...

453

Our Project Regional, community,  

E-Print Network [OSTI]

City departments -City Engineering and Traffic Engineering Public engagement early in project process modes and all users See.Safe.Smart.Rochester campaign to decrease modal conflict Connection

Minnesota, University of

454

2015 Technology Innovation Projects  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for RTU and Lighting Retrofits Energy Efficiency TIP 140: Energy Efficiency Emerging Technology Assessment and Demonstration Projects TIP 261: Determining and Improving the...

455

The MAJORANA project  

SciTech Connect (OSTI)

The Majorana Project, a neutrinoless double-beta decay experiment is described with an emphasis on the choice of Ge-detector configuration.

Elliott, Steven R [Los Alamos National Laboratory

2009-01-01T23:59:59.000Z

456

Project Team Participants Summary  

E-Print Network [OSTI]

-sponsored by Information, Society & Culture) Energy--7 project teams 15 Schools and Institutes Represented Trinity College-Year Seminar: Mapping and Modeling Early Modern Venice #12;

Ferrari, Silvia

457

NAESB BPS ATC Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

By Phone * 10114 NAESB BPS ATC Project Kick Off * 107 - 10814 NAESB BPS - MISO (Carmel, IN) * 112515 - NAESB BPS Conference Call * 12215 - NAESB BPS Conference...

458

PROJECT PLANNING TEMPLATE  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

on public affairs efforts, which includes public information activities, press and media services, DOE home-page content, speaking engagements, special projects, internal...

459

Gravity Train Project  

E-Print Network [OSTI]

Dec 7, 2013 ... Gravity Train Project. Same page in Romanian, Polish, and in French. Let us drill a straight tunnel from West Lafayette, IN to Paris, France:.

460

Mascoma: Frontier Biorefinery Project  

Broader source: Energy.gov [DOE]

This project involves the construction and operation of a biorefinery that produces ethanol and other co-products from cellulosic materials through advanced consolidated bioprocessing.

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Project Description Executive Summary Report  

E-Print Network [OSTI]

$Total Project Cost: 1,000,000Auxillary Enterprises Balances $ 9,400,000Revenue Financing System Bonds $ 1Project Description Executive Summary Report Project Information Project Budget Project Funding 302-680 Parking Structure Phase I This project consists of a 750 space parking garage of approximately 251

O'Toole, Alice J.

462

MASTER OF SCIENCE Enterprise Project  

E-Print Network [OSTI]

MASTER OF SCIENCE Enterprise Project Management PROJECT YOUR FUTURE #12;Stevens Project Management Legacy Master of Science in Enterprise Project Management At Stevens, we understand the value of project. The Master of Science in Enterprise Project Management (MS-EPM) is a 36-credit degree that goes beyond

Yang, Eui-Hyeok

463

EIS-0465: Pepco Holdings, Inc. Mid-Atlantic Power Path (MAPP) Project, Prince George's, Calvert, and Wicomico Counties, Maryland, and Sussex County, Delaware  

Broader source: Energy.gov [DOE]

Pepco Holdings, Inc., cancelled its proposed Phase II of the Mid-Atlantic Power Pathway transmission line project and DOE cancelled preparation of an EIS on the potential environmental impacts of a proposed federal loan guarantee for the project.

464

EA-1966: Sunflower Wind Project, Hebron, North Dakota  

Broader source: Energy.gov [DOE]

Western Area Power Administration (Western) prepared an EA to evaluate potential environmental impacts of interconnecting a proposed 80 MW generating facility south of Hebron in Morton and Stark Counties, North Dakota. The proposed wind generating facility of 30-50 wind turbines encompassed approximately 9,000 acres. Ancillary facilities included an underground collection line system, a project substation, one mile of new transmission line, a new switchyard facility on the existing Dickinson-Mandan 230 kV line owned and operated by Western, one permanent meteorological tower, new access roads, and an operations and maintenance building.

465

River Protection Project (RPP) Project Management Plan  

SciTech Connect (OSTI)

The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

NAVARRO, J.E.

2001-03-07T23:59:59.000Z

466

Florida Electric Transmission Line Siting Act (Florida)  

Broader source: Energy.gov [DOE]

The Transmission Line Siting Act (TLSA) is the states centralized process for licensing electrical transmission lines which; (a) are 230 kV or larger; (b) cross a county line; and, (c) are 15...

467

Policy and procedures for classification of Class III groundwater at UMTRA Project sites. Final  

SciTech Connect (OSTI)

The US Environmental Protection Agency (EPA) has recently proposed groundwater regulations for the US Department of Energy`s )DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. These regulations allow the application of supplemental standards at UMTRA Project sites in specific situations. The designation of groundwater as Class III permits the application of supplemental standards. This document discusses a final UMTRA Project policy and procedures for identifying Class III groundwater, including identification of a review area, definition of water quality, quantification of aquifer yield, and identification of methods reasonably employed for public water supply systems. These items, either individually or collectively, need to be investigated in order to determine if groundwaters at UMTRA Project sites are Class III. This document provides a framework for the DOE to determine Class III groundwaters.

Not Available

1989-03-01T23:59:59.000Z

468

Project Year Spring 2009  

E-Print Network [OSTI]

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

469

The Home Microbiome Project  

SciTech Connect (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-08-25T23:59:59.000Z

470

The Home Microbiome Project  

ScienceCinema (OSTI)

The Home Microbiome Project is an initiative aimed at uncovering the dynamic co-associations between people's bacteria and the bacteria found in their homes.The hope is that the data and project will show that routine monitoring of the microbial diversity of your body and of the environment in which you live is possible.

Gilbert, Jack

2014-09-15T23:59:59.000Z

471

EIS-0398: Delta-Mendota Canal/California Aqueduct Intertie (DCI) Project  

Broader source: Energy.gov [DOE]

This EIS analyzes WAPA's decision to authorize a new interconnection and design, construct, operate, and maintain a new 69-kilovolt transmission line as part of the Delta-Mendota Canal Intertie Project.

472

What can emission lines tell us?  

E-Print Network [OSTI]

1 Generalities 2 Empirical diagnostics based on emission lines 3 Photoionization modelling 4 Pending questions 5 Appendix: Lists of useful lines and how to deal with them

G. Stasinska

2007-04-03T23:59:59.000Z

473

Objective determination of optimal power line designs.  

E-Print Network [OSTI]

??Includes abstract. The thesis investigated the possibility of overhead power line designs being decided by using an objective rather thana subjective method. Power lines are (more)

Stephen, Robert G.

2010-01-01T23:59:59.000Z

474

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

475

Quasistellar Objects: Intervening Absorption Lines  

E-Print Network [OSTI]

We briefly review, at a level appropriate for graduate students and non-specialists, the field of quasar absorption lines (QALs). Emphasis is on the intervening absorbers. We present the anatomy of a quasar spectrum due to various classes of intervening absorption systems, and a brief historical review of each absorber class (Lyman-alpha forest and Lyman limit systems, and metal-line and damped Lyman-alpha absorbers). We also provide several heuristic examples on how the physical properties of both the intergalactic medium and the gaseous environments associated with earlier epoch galaxies can be inferred from QALs. The evolution of these environments from z=4 are discussed.

Jane C. Charlton; Christopher W. Churchill

2000-05-31T23:59:59.000Z

476

Measuring Project Quality Factors Critical to Project Success  

E-Print Network [OSTI]

Measuring Project Quality ­ Factors Critical to Project Success Presented by Thomas Howe P available to measure and track project cost (cheap) and schedule (fast), the measurement and monitoring of project quality (good) is at best underdeveloped. While qualitative measures of project cost and schedule

Calgary, University of

477

Design and development of a 3He replacement safeguards neutron counter based on 10B-lined proportional detector technology  

SciTech Connect (OSTI)

This presentation represents an overview of the experimental evaluation of a boron-lined proportional technology performed within an NA-241 sponsored project on testing of boron-lined proportional counters for the purpose of replacement of {sup 3}He technologies. The presented boron-lined technology will be utilized in a design of a full scale safeguards neutron coincidence counter. The design considerations and the Monte Carlo performance predictions for the counter are also presented.

Henzlova, Daniela [Los Alamos National Laboratory; Evans, Louise [Los Alamos National Laboratory; Menlove, Howard O. [Los Alamos National Laboratory; Swinhoe, Martyn T. [Los Alamos National Laboratory; Rael, Carlos D. [Los Alamos National Laboratory; Martinez, Isaac P. [Los Alamos National Laboratory; Marlow, Johnna B. [Los Alamos National Laboratory

2012-07-16T23:59:59.000Z

478

Setup and organisation of a NDA-system procurement project  

SciTech Connect (OSTI)

Belgoprocess is momentarily in the process of purchasing its fifth NDA-system. Measurement systems are, although based on general designs, not from the shelf items but tailor-made sophisticated and highly automated devices. It is obvious that such a project cannot be carried out by solely a NDA team, but needs a multifunctional team. This team combines NDA expertise with experts in civil works, electrical and mechanical engineering, procurement, IT, safety and legal administration. From less positive experiences in the past, Belgoprocess learned a lot and has now a systematic in place. This systematic structures the project from definition of requirements to operation, a two to three year process. This paper defines the phases of a NDA project and gives for each phase some do's and don'ts. A second subject is the writing and handling of the vast but needed and required documentation. It gives a brief overview of the over thirty documents and files needed. The described, integrated and formal approach reduces the risk of failing projects, systems not meeting the expectations or denied qualification. It puts clear agreements in place, smoothening the relationship between company, supplier and authorities. (authors)

Botte, John; Gielen, Paul [Belgoprocess N.V., Gravenstraat 73, 2480 Dessel (Belgium)

2007-07-01T23:59:59.000Z

479

CRAD, Management- Oak Ridge National Laboratory TRU ALPHA LLWT Project  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a November 2003 assessment of the Management Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory TRU ALPHA LLWT Project.

480

CRAD, Maintenance- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Maintenance program at the Idaho Accelerated Retrieval Project Phase II.

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

EA-1909: South Table Wind Farm Project, Kimball County, Nebraska  

Broader source: Energy.gov [DOE]

DOEs Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed South Table Wind Project, which would generate approximately 60 megawatts from about 40 turbines, to Westerns existing Archer-Sidney 115-kV Transmission Line in Kimball County, Nebraska.

482

CRAD, Criticality Safety- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Criticality Safety program at the Idaho Accelerated Retrieval Project Phase II.

483

CRAD, Conduct of Operations- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February, 2006 Commencement of Operations assessment of the Conduct of Operations program at the Idaho Accelerated Retrieval Project Phase II.

484

CRAD, Training- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Training Program at the Idaho Accelerated Retrieval Project Phase II.

485

CRAD, Fire Protection- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Fire Protection program at the Idaho Accelerated Retrieval Project Phase II.

486

Project Application: Lie Theory and Applications Short description  

E-Print Network [OSTI]

Project Application: Lie Theory and Applications Short description Several lines of investigation. Approximations procedures on regular Fr´echet Lie groups aiming towards solving certain non-linear partial differential equations. We want to apply a new approximation procedure to nonlinear partial differential

Michor, Peter W.

487

CRAD, Radiological Controls- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Radiation Protection Program at the Idaho Accelerated Retrieval Project Phase II.

488

ME Senior Practicum Projects Overview -2008-09/10  

E-Print Network [OSTI]

) T. Bradley V. Manivannan Woodward Turbine Control Unit (4) J. Gessaman Hydraulic Hybrid;ME Senior Practicum Projects Overview - 2008- 09/10 Woodward Turbine Control Unit (4) Cartridge-II failure, the slave CPC-II can seamlessly take control of master hydraulic pressure line. Reliable

489

CRAD, Emergency Management- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Emergency Management program at the Idaho Accelerated Retrieval Project Phase II.

490

CRAD, Occupational Safety & Health- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Occupational Safety and Industrial Hygiene Program at the Idaho Accelerated Retrieval Project Phase II.

491

CRAD, Quality Assurance- Idaho Accelerated Retrieval Project Phase II  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2006 Commencement of Operations assessment of the Quality Assurance Program at the Idaho Accelerated Retrieval Project Phase II.

492

Energy Efficiency Project Development  

SciTech Connect (OSTI)

The International Utility Efficiency Partnerships, Inc. (IUEP) has been a leader among the industry groups that have supported voluntary initiatives to promote international energy efficiency projects and address global climate change. The IUEP maintains its leadership by both supporting international greenhouse gas (GHG) reduction projects under the auspices of the U.S. Department of Energy (DOE) and by partnering with U.S. and international organizations to develop and implement strategies and specific energy efficiency projects. The goals of the IUEP program are to (1) provide a way for U.S. industry to maintain a leadership role in international energy efficiency infrastructure projects; (2) identify international energy project development opportunities to continue its leadership in supporting voluntary market-based mechanisms to reduce GHG emissions; and (3) demonstrate private sector commitment to voluntary approaches to global climate issues. The IUEP is dedicated to identifying, promoting, managing, and assisting in the registration of international energy efficiency projects that result in demonstrated voluntary reductions of GHG emissions. This Final Technical Report summarizes the IUEP's work in identifying, promoting, managing, and assisting in development of these projects and IUEP's effort in creating international cooperative partnerships to support project development activities that develop and deploy technologies that (1) increase efficiency in the production, delivery and use of energy; (2) increase the use of cleaner, low-carbon fuels in processing products; and (3) capture/sequester carbon gases from energy systems. Through international cooperative efforts, the IUEP intends to strengthen partnerships for energy technology innovation and demonstration projects capable of providing cleaner energy in a cost-effective manner. As detailed in this report, the IUEP met program objectives and goals during the reporting period January 1, 2001 through December 31, 2002. At the request of the DOE, we have also included in this report additional activities during the reporting period January, 1999 through January, 2001. This additional information had been reported earlier in the Final Technical Reports that summarized activities undertaken in those earlier periods.

IUEP

2004-03-01T23:59:59.000Z

493

The human genome project  

SciTech Connect (OSTI)

The Human Genome Project will obtain high-resolution genetic and physical maps of each human chromosome and, somewhat later, of the complete nucleotide sequence of the deoxyribonucleic acid (DNA) in a human cell. The talk will begin with an extended introduction to explain the Project to nonbiologists and to show that map construction and sequence determination require extensive computation in order to determine the correct order of the mapped entities and to provide estimates of uncertainty. Computational analysis of the sequence data will become an increasingly important part of the project, and some computational challenges are described. 5 refs.

Bell, G.I.

1991-06-01T23:59:59.000Z

494

Projects | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems Engineering Research and Development (PSEEnergyProjectProjects Projects All 1703

495

Coiled transmission line pulse generators  

DOE Patents [OSTI]

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

496

EA-1981: Bonneville-Hood River Transmission Line Rebuild, Multnomah and Hood River Counties, Oregon  

Broader source: Energy.gov [DOE]

Bonneville Power Administration (BPA) is preparing an EA to assess potential environmental impacts of a proposal to rebuild its 24-mile long, 115 kilovolt Bonneville-Hood River transmission line. The existing line runs between the Bonneville Powerhouse at Bonneville Dam in Multnomah County, Oregon, and BPA's existing Hood River Substation in Hood River County, Oregon. The project would include replacing structures and conductor wires, improving access roads, and constructing new access roads or trails where needed.

497

PFBC Utility Demonstration Project. Annual report, 1991  

SciTech Connect (OSTI)

This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 & 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP`s proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

Not Available

1992-11-01T23:59:59.000Z

498

TUNL Nuclear Data Project, HTML Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security AdministrationcontrollerNanocrystallineForeign ObjectOUR TECHNOLOGIES TECHNOLOGIESC 10C13OLi 16LiNe 16Ne

499

TUNL Nuclear Data Project, HTML Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security AdministrationcontrollerNanocrystallineForeign ObjectOUR TECHNOLOGIES TECHNOLOGIESC 10C13OLi 16LiNe

500

General Project Sequence The following are typical steps on many projects. Actual required steps may vary from project to project  

E-Print Network [OSTI]

General Project Sequence The following are typical steps on many projects. Actual required steps may vary from project to project depending upon the scope, complexity, and specific features. Time periods indicated will vary depending on the nature of the project and needs of the user group

Mather, Patrick T.