Powered by Deep Web Technologies
Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

ITEM  

NLE Websites -- All DOE Office Websites (Extended Search)

ITEM ITEM Revised 4/9/2013 APS LOM 438 DESCRIPTION Start Completion Duration Percent Complete 1-Apr 2-Apr 3-Apr 4-Apr 5-Apr 6-Apr 7-Apr 8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr 14-Apr 15-Apr 16-Apr 17-Apr 18-Apr 19-Apr 20-Apr 21-Apr 22-Apr 23-Apr 24-Apr 25-Apr 26-Apr 27-Apr 28-Apr 29-Apr 30-Apr 1-May 2-May 3-May 4-May 5-May 6-May 7-May 8-May 9-May 10-May 11-May 12-May 13-May 14-May 15-May 16-May 17-May 18-May 19-May 20-May 21-May 22-May 23-May 24-May 25-May 26-May 27-May 28-May 29-May 30-May 31-May 1-Jun 2-Jun 3-Jun 4-Jun 5-Jun 6-Jun 7-Jun 8-Jun 9-Jun 10-Jun 11-Jun 12-Jun 13-Jun 14-Jun 15-Jun 16-Jun 17-Jun 18-Jun 19-Jun 20-Jun 21-Jun 22-Jun 23-Jun 24-Jun 25-Jun 26-Jun 27-Jun 28-Jun 29-Jun 30-Jun 1-Jul 2-Jul 3-Jul 4-Jul 5-Jul 6-Jul 7-Jul 8-Jul 9-Jul 10-Jul 11-Jul 12-Jul 13-Jul 14-Jul 15-Jul 16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 22-Jul 23-Jul 24-Jul 25-Jul 26-Jul 27-Jul

2

Conceptual design plans for the FY 1993 line items  

Science Conference Proceedings (OSTI)

This Facilities Capability Assurance Program (FCAP) project provides for the design and construction of a reconfigured production facility(ies) for Mound`s non-nuclear weapons components. Existing buildings would be rehabilitated in order to locate final production/assembly areas within close proximity and in a facility suitable to operations of this nature. Ancillary operations will be located in nearby buildings, also rehabilitated, in order to provide support to final production with minimal handling and travel-time. Benefits of this reconfiguration include: reduced labor, space requirements, and product cycle time; maximum flexibility to accommodate new mission assignments without new buildings; restores existing manufacturing facilities to a condition that is conducive to state-of-the-art operations. This project is mound`s top priority project for FY93.

NONE

1988-12-22T23:59:59.000Z

3

Associated Students, CSUF, Inc. Definition of Line-Item Expenses  

E-Print Network (OSTI)

transportation costs; custodial contracts; computer technology lease agreements. 2. Fees: Program/Project funding Printing & Advertising Costs for designing and printing brochures, business cards, posters, forms, flyers and departments. It includes all photocopying costs, costs for newspaper ads, and other recruitment costs. -8052

de Lijser, Peter

4

Associated Students, CSUF, Inc. Definition of Line Item Expenses  

E-Print Network (OSTI)

transportation costs; custodial contracts; computer technology lease agreements. 2. Fees: Program/Project funding Printing & Advertising Costs for designing and printing brochures, business cards, posters, forms, flyers and departments. All photocopying costs. Costs for newspaper ads and other recruitment costs. -8052 Communications

de Lijser, Peter

5

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

6

Northern Pass Transmission Line Project Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September...

7

Criticality Safety Support to a Project Addressing SNM Legacy Items at LLNL  

SciTech Connect

The programmatic, facility and criticality safety support staffs at the LLNL Plutonium Facility worked together to successfully develop and implement a project to process legacy (DNFSB Recommendation 94-1 and non-Environmental, Safety, and Health (ES&H) labeled) materials in storage. Over many years, material had accumulated in storage that lacked information to adequately characterize the material for current criticality safety controls used in the facility. Generally, the fissionable material mass information was well known, but other information such as form, impurities, internal packaging, and presence of internal moderating or reflecting materials were not well documented. In many cases, the material was excess to programmatic need, but such a determination was difficult with the little information given on MC&A labels and in the MC&A database. The material was not packaged as efficiently as possible, so it also occupied much more valuable storage space than was necessary. Although safe as stored, the inadequately characterized material posed a risk for criticality safety noncompliances if moved within the facility under current criticality safety controls. A Legacy Item Implementation Plan was developed and implemented to deal with this problem. Reasonable bounding conditions were determined for the material involved, and criticality safety evaluations were completed. Two appropriately designated glove boxes were identified and criticality safety controls were developed to safely inspect the material. Inspecting the material involved identifying containers of legacy material, followed by opening, evaluating, processing if necessary, characterizing and repackaging the material. Material from multiple containers was consolidated more efficiently thus decreasing the total number of stored items to about one half of the highest count. Current packaging requirements were implemented. Detailed characterization of the material was captured in databases and new ES&H container labels applied. In many cases, legacy material that was inspected was determined to be excess to programmatic needs and it was then either processed to meet the DOE-3013-STD or designated as TRU waste and disposed of accordingly. During FY2003 through FY2004 approximately 1600 items were opened and the items processed if necessary, repackaged and newly labeled with ES&H labels. As of April, 2005, there are only 32 non-ES&H labeled items in existence within the Plutonium Facility. Due to a consolidated effort in dealing with the legacy items, the problems associated with storage of these items at LLNL has been substantially abated. The paper will discuss the background, implementation, and results of the SNM Legacy Items Implementation Project. Benefits and Lessons Learned will be identified.

Pearson, J S; Burch, J G; Dodson, K E; Huang, S T

2005-03-29T23:59:59.000Z

8

EIS-0325: Schultz-Hanford Area Transmission Line Project Final...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003) EIS-0325: Schultz-Hanford Area Transmission Line Project...

9

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion,...

10

EA-1960: Townsite Solar Project Transmission Line, Clark County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management,...

11

EA-1896: Williston to Stateline Transmission Line Project, Mountrail...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project,...

12

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

13

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge...

14

Proposed Project: Plains & Eastern Clean Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Proposed Project: Plains & Eastern Clean Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line's proposal was responsive to the RFP, and it is currently under consideration. The proposed Plains & Eastern Clean Line project (the proposed project) would include an overhead +/- 600 kV direct current electric transmission system and associated facilities with the capacity to deliver approximately

15

Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation  

Science Conference Proceedings (OSTI)

The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

Ohler, C.K.

1991-05-21T23:59:59.000Z

16

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

17

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

18

EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

60: Townsite Solar Project Transmission Line, Clark County, 60: Townsite Solar Project Transmission Line, Clark County, Nevada EA-1960: Townsite Solar Project Transmission Line, Clark County, Nevada SUMMARY The Bureau of Land Management, with Western Area Power Administration as a cooperating agency, prepared an EA to evaluate potential impacts of a proposal to build and operate a 180-MW photovoltaic facility; a 220, 230, or 500 kV transmission line; and associated facilities in Clark County, Nevada. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD October 28, 2013 EA-1960: Finding of No Significant Impact Townsite Solar Project Transmission Line, Clark County, Nevada June 28, 2013 EA-1960: Final Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada

19

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

20

The Swinburne on-line education project  

Science Conference Proceedings (OSTI)

Many universities throughout the world are exploring the possibilities of on-line delivery of educational programs. These developments have the potential to significantly change the face of higher education as we know it today. In order to compete in ... Keywords: WWW, on-line education

C. J. Pilgrim; M. J. Creek

1998-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Northern Pass Transmission Line Project Environmental Impact Statement:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Northern Pass Transmission Line Project Environmental Impact Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 Northern Pass Transmission Line Project Environmental Impact Statement: Announcement of Change in Public Meeting Location: Federal Register Notice Volume 78, No. 181 - September 18, 2013 DOE has changed the location of the September 26 public scoping meeting for the Northern Pass Transmission Line Project to Colebrook Elementary School, 27 Dumont Street, Colebrook, NH. On September 6, 2013, the U.S. Department of Energy (DOE) published in the Federal Register an amended Notice of Intent (NOI) to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement

22

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Champlain Hudson Power Express Transmission Line Project, 7: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line would run from the Canadian Province of Quebec to New York City. Public Comment Opportunities None available at this time. Documents Available for Download December 6, 2013 EIS-0447: DOE Notice of Availability of Draft Environmental Impact Statement Champlain Hudson Power Express Transmission Line Project, New York

23

Kangley - Echo Lake Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STATEMENT STATEMENT Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Cooperating Agency: U.S. Department of Agriculture, Forest Service (USFS) Title of Proposed Project: Kangley-Echo Lake Transmission Line Project State Involved: Washington Abstract: BPA is proposing to build a new transmission line to accommodate increasing demand for electricity and ensure reliability in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmis- sion line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as

24

Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10  

DOE Green Energy (OSTI)

Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

None

1977-01-01T23:59:59.000Z

25

Request for Proposals for New or Upgraded Transmission Line Projects...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005: Federal Register Notice Volume 75, No. 111 - Jun 10, 2012...

26

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Estes to Flatiron Substation Transmission Lines Rebuild 3: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO SUMMARY DOE's Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support

27

EIS-0447: Champlain Hudson Power Express Transmission Line Project, New  

NLE Websites -- All DOE Office Websites (Extended Search)

447: Champlain Hudson Power Express Transmission Line Project, 447: Champlain Hudson Power Express Transmission Line Project, New York EIS-0447: Champlain Hudson Power Express Transmission Line Project, New York Summary This EIS evaluates the environmental impacts of a DOE proposal to grant a Presidential permit to Champlain Hudson Power Express, Inc., to construct, operate, maintain, and connect a new 1000-megawatt (MW) electric transmission system across the U.S.-Canada border in northeastern New York State. The proposed transmission line will run from the Canadian Province of Quebec to New York City. DOE also published a notice correcting the location of the public hearing that was held on November 19, 2013. Public Comment Opportunities As of December 6, 2013 - Comment Period Extended through 1/15/14 Written comments must be received by January 15, 2014. Comments submitted

28

Libby-Troy Line Rebuild Project - July 25, 2008  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Libby to Troy Rebuild Project 1 Libby to Troy Rebuild Project 1 Record of Decision July 2008 Bonneville Power Administration Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Record of Decision July 2008 Decision The Bonneville Power Administration (BPA) has decided to implement the Proposed Action with the Kootenai River Crossing realignment option that was identified in the Rebuild of the Libby (FEC) to Troy Section of BPA's Libby to Bonners Ferry 115-kilovolt Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0379, May 2008). To implement this alternative, BPA will rebuild the 17-mile-long Libby-Troy section of the existing transmission line at the same voltage (115 kilovolt (kV)) with the same number of circuits (one). BPA will

29

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 71% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

30

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target 1st Qtr FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 73% Line Item 70% Pre-CAP 100% Post-CAP This is a projection based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

31

EIS-0486: Plains & Eastern Clean Line Transmission Project  

Energy.gov (U.S. Department of Energy (DOE))

This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA).

32

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

33

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual FY 2011 Pre- & Post-CAP Actual Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 77% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

34

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

35

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 79% Line Item 71% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

36

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Third Quarter Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) Projects completed within 110% of CD-2 TPC. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 90% Line Item 84% Line Item 78% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY09 to FY11). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of Projects completed within 110% of CD-2 TPC by FY12. 2b. EM Cleanup (Soil and Groundwater Remediation,

37

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Forecast FY 2011 Pre- & Post-CAP Forecast Comment 1a. Capital Asset Line Item Projects:...

38

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCACAP)...

39

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCACAP)...

40

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 Contract/Project Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY 2010 Pre- & Post-CAP Comment 1a. Capital Asset Line Item Projects: (Pre-RCA/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 1b. Capital Asset Line Item Projects: (Post-RCA/CAP) 85% Line Item 69% Line Item 67% Pre-CAP 100% Post-CAP This is based on a 3-year rolling average (FY08 to FY10). TPC is Total Project Cost. 2a. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: (Pre- RAC/CAP) 90% of projects completed within 110% of CD-2 TPC by FY11. 2b. EM Cleanup (Soil and Groundwater Remediation,

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

The motivic fundamental group of the punctured projective line.  

E-Print Network (OSTI)

We describe a construction of an object associated to the fundamental group of the projective line minus three points in the Bloch-Kriz category of mixed Tate motives. This description involves Massey products of Steinberg symbols in the motivic cohomology of the ground field.

Bertrand J. Guillou

42

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...

43

Action Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACTION ITEMS ACTION ITEMS Presentation to the DOE High Level Waste Corporate Board July 29, 2009 Kurt Gerdes Office of Waste Processing DOE-EM Office of Engineering & Technology 2 ACTION ITEMS Action Item Status * Approve Performance Assessment Community of Practice Charter * Charter approved 13 July 2009 by majority vote of Board (balloting conducted by e- mail). * Report on first Performance Assessment Community of Practice meeting * Meeting held on 13-14 July 2009. Report by David Kosson, PhD, Vanderbilt University and CRESP * Update of Tank Waste Corporate Board Charter to include changes resulting from changes in Office of Environmental Management * In progress (pending completion of any reorganization) * Update of Performance Assessment Community of Practice Charter to include

44

Plains & Eastern Clean Line Project Proposal for New or Upgraded  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plains & Eastern Clean Line Project Proposal for New or Upgraded Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) Update to Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (August 2011) More Documents & Publications EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland Involvement Notice of Intent To Prepare an Environmental Impact Statement for the

45

DOE/EA-1366; Environmental Assessment Santiam-Bethel Transmission Line Project (09/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Environmental Assessment Preliminary Environmental Assessment Santiam-Bethel Transmission Line Project Bonneville Power Administration September 2001 Santiam-Bethel Transmission Line Project Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Name of Proposed Project: Santiam-Bethel Transmission Line Project Abstract: Bonneville Power Administration proposes to rebuild the first 17 miles of the Santiam-Chemawa transmission line from Santiam Substation to the line's connection to Portland General Electric's Bethel Substation. BPA would replace the existing single-circuit 230-kilovolt (kV) line with towers that could support two circuits. The existing line supplies both Bethel Substation and BPA's Chemawa Substation. The new lines would eliminate

46

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and and Wallula - McNary Transmission Line Project Final Environmental Impact Statement DOE/EIS-0330 Lead Agencies Bonneville Power Administration Washington State Energy Facility Site Evaluation Council Cooperating Agencies Bureau of Land Management U.S. Fish and Wildlife Service August 2002 EFSEC Washington State Energy Facility Site Evaluation Council August 2002 Dear Reader: Enclosed for your reference is the abbreviated form Final Environmental Impact Statement (FEIS) for the proposed Wallula Power Project and Wallula-McNary Transmission Line Project. This document is designed to supplement or correct information provided in the Draft Environmental Impact Statement (DEIS). The proponent, Wallula Generation, LLC, has requested to build a 1,300-megawatt, gas-fired

47

Wallula Power Project and Wallula - McNary Transmission Line Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Wallula Generation, LLC proposes to construct a 1,300-megawatt (MW) natural gas-fired combined-cycle combustion gas turbine facility (the Wallula Power Project). The project would be located in the northwestern portion of Walla Walla County, Washington, approximately 8 miles south of the City of Pasco, 2 miles north of the unincorporated community of Wallula, and 7 miles southeast of the unincorporated community of Burbank. The purpose of the proposed power project is to provide energy to meet the needs of the Northwest and other interconnected electric transmission areas where electrical energy is needed. Firm transmission of the power generated by the Wallula Power Project would require construction of a new 500-kilovolt (kV) transmission line and construction of a new switchyard near Smiths Harbor. Approximately 5.1 miles of new transmission line from the proposed generation plant to the new switchyard would be completed. An additional 28 miles of new transmission line from the Smiths Harbor Switchyard to the McNary Substation would be constructed adjacent to the existing Lower Monumental-McNary transmission line and upgrades completed to the existing McNary Substation if loads are exceeded on the existing line. Wallula Generation, LLC, would construct and operate the generation plant and associated facilities, including the makeup water supply line. Bonneville would design, construct, and operate the two 500 kV transmission line segments and switchyard. To supply natural gas to the plant site, a 5.9-mile pipeline interconnection would be engineered, constructed, owned, and operated by PG&E Gas Transmission-Northwest (GTN). This EIS evaluates the environmental impacts of the proposed action, which includes the proposed power plant and 33-mile transmission line. It also evaluates an alternative using taller towers and longer spans between towers along part of the transmission line, and the use of an alternative approach for the transmission line where it would enter the McNary Substation. The No Action Alternative is also addressed.

N /A

2002-08-16T23:59:59.000Z

48

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

52: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon SUMMARY Bonneville...

49

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT PROPOSAL PROJECT PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 JULY 2010 TABLE OF CONTENTS INTRODUCTION 1. The Challenge ....................................................................................................................................... 1 2. The Solution .......................................................................................................................................... 1 SECTION I: STATUTORY CRITERIA 1. General Description of the Entity ................................................................................................... 4 2. Project Description ............................................................................................................................. 5

50

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 st Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - No 1 st Qtr FY09 completions. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

51

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 72% This is a 3-year rolling average (FY07 to FY09). No 3 rd qtr FY09 completions. 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively. 85% Line Item

52

Kangley - Echo Lake Transmission Line Project, Final Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Selleck Kangley North Bend Cedar Falls Existing Transmission Lines Proposed Transmission Line Alternatives Under Consideration BPA Substation Alternative * * * * * * ...

53

Sierra Pacific Power Company Alturas Transmission Line Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

transmission line to withstand expected maximum fault displacement. . ES-49 KesidualI*acf '.:, , ,,.,, .. .... ...... .. . ... . .. . .. .. . . . .. ,,. ,::.,. ,.,,, ,..,, lot...

54

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

55

Technical Evaluation for the Determination of CGI Designation for Safety Class Items Incorporated in Hose-in-Hose Transfer Line Assemblies  

SciTech Connect

The purpose of this technical evaluation is to determine whether the secondary hoses are to be categorized as Commercial Grade Items (CGI) or Engineered Equipment. This determination will identify whether or not use of the CGI Dedication process is appropriate.

BUCHANAN, J.R.

2000-05-16T23:59:59.000Z

56

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final EIS Appendix A: Revised Mitigation Measures Final EIS Appendix A: Revised Mitigation Measures August 2002 Page A-1 Appendix A Revised Mitigation Measures The proposed project includes measures that would limit construction and operation impacts to elements of the natural and human environment. These measures are presented for each element of the environment identified as a potential concern by Bonneville and EFSEC based on preliminary environmental review and public and regulatory agency input. Updates to the mitigation table below are in response to comments on the Draft EIS or to incorporate new information included in the Settlement Agreements. Mitigation Measure Power Plant Pipelines Bonneville T-Line EARTH Seismicity Facilities would be designed to meet regional seismic design criteria as presented in the Uniform Building Code (UBC). X X

57

DOE/EA-1485: Environmental Assessment for the Nisqually Transmission Line Relocation Project (January 2005)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nisqually Transmission Line Relocation Project Nisqually Transmission Line Relocation Project Revision Sheet for the Environmental Assessment Finding of No Significant Impact Mitigation Action Plan DOE/EA-1485 Bonneville Power Administration January 2005 Nisqually Transmission Line Relocation Project Revision Sheet for Final Environmental Assessment 1 Revision Sheet for the Nisqually Transmission Line Relocation Project Final Environmental Assessment DOE/EA -1485 Summary This revision sheet documents the changes to be incorporated into the Nisqually Transmission Line Project Preliminary Environmental Assessment (EA). With the addition of these changes, the Preliminary EA will not be reprinted and will serve as the Final EA. On October 18, 2004, the Preliminary EA was sent to agencies and interested parties. Notification

58

EIS-0486: Plains & Eastern Clean Line Transmission Project | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86: Plains & Eastern Clean Line Transmission Project 86: Plains & Eastern Clean Line Transmission Project EIS-0486: Plains & Eastern Clean Line Transmission Project SUMMARY This EIS will evaluate the potential environmental impacts of participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage direct current (HVDC) electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts (MW) primarily from renewable energy generation facilities in the Oklahoma Panhandle region to load-serving entities in the Mid-South and Southeast via an interconnection with the Tennessee Valley Authority (TVA). PUBLIC COMMENT OPPORTUNITIES None available at this time.

59

Schultz-Hanford Area Transmission Line Project (DOE-eis-0325)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Schultz-Hanford Area Transmission Line Project Schultz-Hanford Area Transmission Line Project Record of Decision March 2003 Bonneville Power Administration Schultz-Hanford Area Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Schultz-Hanford Area Transmission Line Project in Benton, Douglas, Grant, Kittitas, and Yakima Counties, Washington. BPA has decided to implement the Agency Preferred Alternative identified in the Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0325, January 2003), with the exception of Option 1 of the Sickler-Schultz Reroute. Due to landowner concerns, BPA will now implement Option 2 of the Sickler-Schultz Reroute. The Agency Preferred Alternative consists of constructing a new 500-kilovolt (kV) transmission

60

Action Item Review and Status  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Corporate Board Waste Corporate Board Action Items Action Item Resolution Action Item Strategic Planning Initiative Optimization Study Resolution Presentation by S. Schneider (HLW System Integrated Project Team) Pretreatment Whitepaper Presentation by W. Wilmarth (Role of Liquid Waste Pretreatment Technologies in Solving the DOE Clean-up Mission) Draft Charter for Performance Assessment Sub-Committee Presentation by J. Marra (Performance Assessment Community of Practice) Final Report from Slurry Transport Workshop In final stages of review and Approval; will be distributed when complete This document is intended for planning and analysis purposes, assuming a continuing constrained budget environment. Every effort will be made to comply with all applicable environmental and legal obligations,

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

News item  

NLE Websites -- All DOE Office Websites (Extended Search)

HUMAN RIGHTS, NONDISCRIMINATION, HUMAN RIGHTS, NONDISCRIMINATION, ANTIHARASSMENT AT FERMILAB If you encounter discrimination or harassment at Fermilab, tell someone you trust. Talk to your supervisor, to Equal Employment Opportunity Manager Dianne Engram (4633), or to laboratory management, including the Laboratory Director Michael Witherell. You can call the Fermilab Action Line at 840-4000 to make your concerns known anonymously. If you feel you need to talk with someone outside the laboratory, you can talk directly to Corporate Counsel, URA, Inc., Washington, D.C. at 202-293-1382. You can call the hotline of the Inspector General of the Department of Energy at 1-800-541-1625 or 1-202-586-4073. You can also communicate directly with the DOE Area Manager's Office (x3281). HUMAN RIGHTS POLICY

62

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Prendergast Prendergast David Prendergast Director (acting), Theory of Nanostructured Materials dgprendergast@lbl.gov 510.486.4948 website Research Interests My current work focuses on using many-body electronic structure techniques to compute the excited state properties of materials from first-principles, with an emphasis on complex nanostructures, such as carbon nanotubes, which exhibit strong excitonic effects due to quantum confinement. Learn more about my research on my nanotheory page. Current Projects Computing excitonic states with accurate accounting of electron-hole binding via solution of the Bethe-Salpete equation Electron-Hole Interaction in Carbon Nanotubes: Novel Screening and Exciton Excitation Spectra In summary, our analysis shows that the use of an electron-hole interaction

63

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Foundry User Alveo Energy Receives $4M from ARPA-E Foundry User Alveo Energy Receives $4M from ARPA-E Alveo Energy-a Bay Area start-up company and Molecular Foundry user-has been awarded $4 million by ARPA-E for their project, "Open Framework Electrode Batteries for Cost-Effective Energy Storage." This venture seeks to develop a new class of batteries based on the pigment Prussian Blue to provide efficient, cost-effective support of renewable energy sources. "This ARPA-E award is an enormous opportunity for Alveo." says Colin Wessells, CEO and lead researcher for Alveo Energy. "It will allow us to rapidly push our battery technology from the final stages of lab R&D through initial pilot-scale production. " The new batteries use a family of electrode materials based on a common and

64

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Alison Hatt to Direct User Program Alison Hatt to Direct User Program Alison Hatt has been chosen to head the Molecular Foundry's User Program. She is succeeding David Bunzow, who is retiring this month. As User Program Director, Alison will be responsible for overseeing the Foundry's scientific proposal process, including administration associated with User proposal submissions, peer reviews, and scheduling approved projects; working with scientific staff to reach out to and grow new diverse, engaged and productive User communities; liaising with User Executive Committee leadership; and supervising the User Program Office staff. As a former Foundry postdoctoral scientist, Alison brings a diverse skill set and unique experience to the position. Since 2011, she has served as Public Affairs Specialist for the Materials Sciences Division (MSD) where

65

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona

66

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80: Big Bend to Witten Transmission Line Project, South Dakota 80: Big Bend to Witten Transmission Line Project, South Dakota EA-1880: Big Bend to Witten Transmission Line Project, South Dakota Summary The USDA Rural Utilities Service, with DOE's Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota. Proposed action is related to the Keystone XL project (see DOE/EIS-0433-S1). Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download April 12, 2011

67

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% - Two projects completed in the 2 nd Qtr FY09. This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

68

Double Bottom Line Project Report:Assessing Social Impact In Double Bottom Line Ventures  

E-Print Network (OSTI)

of Key Characteristics Glossary Method Summaries Theories ofin double bottom line ventures methods catalog glossary ofterms glossary of terms This glossary defines the variables

Rosenzweig, William

2004-01-01T23:59:59.000Z

69

Project W-314 specific test and evaluation plan for transfer line SN-633 (241-AX-B to 241-AY-02A)  

SciTech Connect

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made by the addition of the SN-633 transfer line by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the addition of transfer line SN-633. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z

70

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 4 8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2008 Target FY 2008 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 75% 76% This is a 3-year rolling average Data includes FY06 to FY08. (37/48) 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A Near-term Baselines established for all EM cleanup projects. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12, respectively.

71

Contract/Project Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets Contract/Project Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. Capital Asset Line Item Projects: 90% of projects completed within 110% of CD-2 TPC by FY11. 80% 73% This is a 3-year rolling average (FY07 to FY09). 2. EM Cleanup (Soil and Groundwater Remediation, D&D, and Waste Treatment and Disposal) Projects: 90% of EM cleanup projects complete 80% of scope within 125% of NTB TPC by FY12. Establish Baseline N/A This metric has been overcome by events. Beginning in FY10, EM projects are to be measured against metric #1 above. 3. Certified EVM Systems: Post CD-3, 95% of line item projects and EM cleanup projects by FY11 and FY12,

72

Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Keeler-to-Tillamook Transmission Line Keeler-to-Tillamook Transmission Line Rebuild Project Draft Environmental Assessment October 2013 This page deliberately left blank. Bonneville Power Administration i Contents Chapter 1 Purpose and Need for Action ............................................................................................ 1-1 1.1 Introduction ................................................................................................................................. 1-1 1.2 Need for Action ............................................................................................................................ 1-1 1.3 Purposes of Action ....................................................................................................................... 1-2

73

K basin sandfilter backwash line characterization project, analytical results for campaign 15  

Science Conference Proceedings (OSTI)

Sample 183KWBMF was taken from the K West Sandfilter Backwash Pit on August 28, 1998 and received by 222-S Laboratory on August 28, 1998. Analyses were performed in accordance with ''Letter of Instruction for K Basins Sandfilter Backwash Line Samples'' (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project.

STEEN, F.H.

1999-05-18T23:59:59.000Z

74

Project Title Economic Modeling & Unconventional Gas Resource Appraisal Program Line Tough Gas  

E-Print Network (OSTI)

support to assess the economic viability of new tough gas plays (tight gas, shale gas, CBM). Project are illustrated using the US shale gas plays as case templates. Discounted cash flow models are applied1 Project Title Economic Modeling & Unconventional Gas Resource Appraisal Program Line Tough Gas

Santos, Juan

75

Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect

This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

N /A

2002-02-08T23:59:59.000Z

76

DOE/EA-1602: Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment (November 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alternative Intake Project Alternative Intake Project Transmission Line and Interconnection Final Environmental Assessment November 2008 DOE/EA-1602 DOE/EA-1602 Final Environmental Assessment for the Western Area Power Administration Alternative Intake Project Transmission Line and Interconnection As part of its comprehensive water quality strategy to protect and improve water quality for its customers, the Contra Costa Water District (CCWD) is implementing the Alternative Intake Project (AIP). The AIP will enable CCWD to relocate some of its existing diversions to Victoria Canal, a Delta location with higher-quality source water than is currently available at its Old River and Rock Slough intakes. The AIP project purpose is to protect and improve the quality of water delivered to CCWD's untreated-

77

Professional Registration Item Writer  

Science Conference Proceedings (OSTI)

Volunteer Training Module. March 2013. 1. Your Professional Partner for Career Advancement. Professional Registration. Item Writer. Online Training Module.

78

Kangley - Echo Lake Transmission Line Project, Supplemental Draft Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration P.O. Box 491 Vancouver, Washington 98666-0491 TRANSMISSION BUSINESS LINE January 14, 2003 In reply refer to: T-DITT-2 To: People Interested in the Kangley-Echo Lake Transmission Line Project Bonneville Power Administration (BPA) has completed a supplemental draft Environmental Impact Statement (SDEIS) for the proposed Kangley-Echo Lake Transmission Line Project. The proposed line in central King County, Washington is needed to accommodate electrical growth and reliability concerns in the Puget Sound area. The SDEIS analyzes four additional transmission alternatives not analyzed in detail in the draft Environmental Impact Statement (DEIS) issued in June 2001, and a number of non-transmission alternatives. This letter provides

79

Microsoft Word - Grand Coulee Transmission Line Replacement Project Prelim EA.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee's Third Powerplant 500-kilovolt Transmission Line Replacement Project Preliminary Environmental Assessment May 2011 DOE/EA-1679 Agency Proposing Action. U.S. Bureau of Reclamation is the lead NEPA agency. The Bonneville Power Administration is assisting Reclamation through project design, environmental review and construction, if the Proposed Action is taken. Action. Reclamation is proposing to replace the six, 500- kV transmission lines of the Third Powerplant (TPP) at Grand Coulee Dam. The transmission lines are presently installed within the dam and a two-chambered tunnel that leads to a Spreader Yard about a mile away. Purpose and Need. The TPP's six generators and transmission lines are critical to the regional power supply.

80

Functional design criteria exploratory shaft power line and substation Project B-417  

SciTech Connect

This project will provide a 13.8-KV, 3-phase electrical power line from substation B-251 to the ES site. The power line will be sized to carry the 6000 KVA power required to meet the construction and operations power requirements of the facility. The line will originate at an existing circuit breaker at the 13.8 KV switch gear at substation B-251 and will terminate at fused cutouts at the ES site. Wood poles will be used for the aerial support of the {approximately}4.7 mile transmission line. Joint use of the line by project B-316 is being considered. The substation will provide transformation from 13.8 KV to 2.4 KV, transformer mounting, grounding grid for the entire substation, the substation fence, and connection between the primary side of the transformer and the 13.8 KV electrical line (last pole) provided by Part 1. Switching stations, protective devices, and metering, which are normally part of a substation, will be provided by the ES Project, B-314. 10 refs.

Schroeder, B.K.

1981-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Conceptual Design Report, Exploratory Shaft Power Line and Substation, Project B-417  

SciTech Connect

This project will provide a 13.8-KV, 3-phase electrical power line from substation B-251 to the ES site. The power line will be sized to carry the 6000 KVA power required to meet the construction and operations power requirements of the facility. The line will originate at an existing circuit breaker at the 13.8 KV switch gear at substation B-251 and will terminate at fused cutouts at the ES site. Wood poles will be used for the aerial support of the {approximately}4.7 mi. transmission line. Joint use of the line by project B-316 is being considered. This part will provide transformation from 13.8 KV to 2.4 KV, transformer mounting, grounding grid for the entire substation, the substation fence, and connection between the primary side of the transformer and the 13.8 KV electrical line (last pole) provided by Part I. Switching stations, protective devices, and metering, which are normally part of a substation, will be provided by the ES project, B-314. This report includes drawings, cost estimates and schedules.

Schroeder, B.K. (Kaiser Engineers Hanford Co., Richland, WA (USA))

1982-03-01T23:59:59.000Z

82

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

83

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Phase I Lovell Yellowtail and Basin-Lovell Transmission Line Rebuild Project Big Horn and Carbon Counties, Montana and Big Horn County, Wyoming MITIGATION ACTION IDENTIFIER RESPONSIBLE PARTY FOR IMPLEMENTING MITIGATION ACTION LOCATION IF AVAILABLE/ STRUCTURE NUMBERS PARTY RESPONSIBLE FOR MONITORING AND ENSURING COMPLIANCE 1 Construction Contractor Western Maintenance Standard Construction Project Practices will be implemented through Phases I of Project construction and operation (Table 2.1-3 in the Final EA.) Western Construction (during Construction Phase) Western Maintenance (During maintenance of facility) NPS - WESTERN INTERAGENCY AGREEMENT FOR BIGHORN CANYON NRA 2 NPS, Western The Interagency Agreement between United

84

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy announces its intent to modify the scope of the Northern Pass Transmission Line Project Environmental Impact Statement and to conduct additional public scoping meetings. The Federal Register Notice, which is now available for downloading, includes information on how to submit comments and participate in the additional public scoping meetings.

85

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to evaluate potential environmental impacts of rebuilding its 41-mile long 115 kilovolt (kV) wood-pole Kalispell-Kerr transmission line between Kalispell and Polson, Montana. Additional information is available on the project website, http://efw.bpa.gov/environmental_services/Document_Library/KALISPELL_KERR/.

86

Schultz-Hanford Area Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement Final Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense January 2003 Final Environmental Impact Statement Responsible Agencies: U.S. Department of Energy, Bonneville Power Administration (BPA), Richland Operations Office (RL); U.S. Department of Defense, Department of Army (USDOA); U.S. Department of Interior, Bureau of Land Management (BLM), Bureau of Reclamation (BOR), Fish and Wildlife Service (USFWS). Title of Proposed Project: Schultz-Hanford Area Transmission Line Project - DOE/EIS-0325 State Involved: Washington Abstract: BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project

87

EIS-0325: Schultz-Hanford Area Transmission Line Project Final Environmental Impact Statement, EIS-0325 (January 2003)  

Energy.gov (U.S. Department of Energy (DOE))

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

88

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

89

El Paso electric 345 kV, Springerville to Deming, transmission line project, New Mexico  

SciTech Connect

Construction of a 213.5-mile, 345-kilovolt (kV) transmission line is proposed from the El Paso Electric Company Luna substation, 1.5 miles north of Deming, to a point on the existing Tucson Electric Power Company transmission line near Red Hill, in New Mexico. Counties in New Mexico that could be directly affected are Luna, Sierra, Socorro, Catron, and Grant. The proposed line would use wood towers, 51 to 55 feet high, placed at an average interval of 800 feet. More equipment would be added to the Luna substation, consisting of a 345-kV circuit breaker, two switches, a dead-end tower, and relay equipment. Communication and control would be provided through a microwave radio system. The transmission line would be paralleled by a two-track road for routine patrol. Estimated cost of the project is $42.9 million.

Not Available

1985-07-01T23:59:59.000Z

90

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

91

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENT, FISH AND WILDLIFE August 30, 2002 In reply refer to: T To: People Interested in the McNary-John Day Transmission Line Project Bonneville Power Administration (Bonneville) has finalized the enclosed Environmental Impact Statement (EIS) for the McNary-John Day Transmission Line Project. In March, we sent you the draft EIS, asked for your comments and had three public meetings. The response was great; we received about 350 comments on the draft document. Thank you for taking the time to read the document and tell us your ideas. This letter briefly describes the final EIS, outlines our next steps and tells where to call if you have questions. The final EIS is abbreviated, consisting of an introduction to the document, changes to the draft

92

McNary-John Day Transmission Line Project Record of Decision (DOE/EIs-0332), (11/08/02)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Record of Decision Decision The Bonneville Power Administration (Bonneville) has decided to construct the proposed McNary-John Day Transmission Line Project in Benton and Klickitat Counties, Washington, and Sherman and Umatilla Counties, Oregon. Bonneville has decided to implement the proposed action identified in the McNary-John Day Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0332, August 2002). The proposed action consists of building 79 miles of 500-kilovolt (kV) transmission line between Bonneville's McNary Substation and John Day Substation. As part of the proposed action, Bonneville has also decided to construct certain short-line routing alternatives identified in the Final EIS. These alternatives are the

93

Agenda item 11  

Science Conference Proceedings (OSTI)

Agenda item 11 CRD 3 JOINT FAO/WHO Food Standards Programme Codex Committee on Methods of analysis and Sampling 22nd Session Budapest, Hungary, 23-27 November 1998 REPORT OF THE 13TH INTERAGENCY MEETING (IAM-

94

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

95

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

96

Cultural-resource survey report: Hoover Dam Powerplant Modification Project II. Associated transmission-line facility  

Science Conference Proceedings (OSTI)

The Bureau of Reclamation (Reclamation) is proposing to modify or install additional transmission facilities between the Hoover Dam hydroelectric plant and the Western Area Power Authority substation near Boulder City, Nevada. Reclamation has completed cultural resource investigations to identify historic or prehistoric resources in the project area that might be affected during construction of the transmission line. Four possible transmission corridors approximately 50 feet wide and between 9.5 and 11.5 miles long were investigated. The proposed transmission lines either parallel or replace existing transmission lines. The corridors generally have undergone significant disturbance from past transmission line construction. A Class II sampling survey covering approximately 242 acres was conducted. Access or construction roads have not been identified and surveys of these areas will have to be completed in the future. No historic or prehistoric archeological sites were encountered within the four corridor right-of-ways. It is believed that the probability for prehistoric sites is very low. Four historic period sites were recorded that are outside, but near, the proposed corridor. These sites are not individually eligible for the National Register of Historic Places, but may be associated with the construction of Hoover Dam and contribute to a historic district or multiple property resource area focusing on the dam and its construction.

Queen, R.L.

1991-06-01T23:59:59.000Z

97

Microsoft Word - NEPA_CX_FINAL_Lancaster_Line_and_Load_Project_06-15-2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2012 8, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Charla Burke Project Manager - TEP-TPP-1 Proposed Action: Lancaster Line and Load Project - LO311 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities B4.7 Fiber optic cable Location: Lancaster Substation, Kootenai County, Idaho; approximately 2.2 miles southwest of Rathdrum, Idaho, (Township 51 North, Range 5 West, Section 11). Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to add equipment to its existing Lancaster Substation, replace one transmission structure, modify one existing structure, and replace existing

98

BWRVIP-53-A: BWR Vessel and lnternals Project, Standby Liquid Control Line Repair Design Criteria  

Science Conference Proceedings (OSTI)

The Boiling Water Reactor Vessel and Internals Project (BWRVIP), formed in June, 1994, is an association of utilities focused exclusively on BWR vessel and internals issues. This BWRVIP report documents criteria which can be used to design a repair for the standby liquid control (SLC) line in a BWR. A previous version of this report was published as BWRVIP-53 (TR-108716). This report (BWRVIP-53- A) incorporates changes proposed by the BWRVIP in response to U.S. Nuclear Regulatory Commission (NRC) Request...

2005-09-07T23:59:59.000Z

99

Kangley - Echo Lake Transmission Line Project Supplemental Draft Environmental Impact Statement  

SciTech Connect

Bonneville Power Administration (BPA) is proposing to build a new transmission line to accommodate increasing demand for electricity and address reliability concerns in the Puget Sound area. The Proposed Action would construct a new line that would connect to an existing transmission line near the community of Kangley, and then connect with BPA's existing Echo Lake Substation. The major purpose of this proposal is to improve system reliability in the King County area. An outage on an existing line during times of heavy use, such as during a winter cold snap, could cause voltage instability and a loss of power in the King County area. System planners have projected total system load using normal growth in demand and determined that system instability could develop as early as the winter of 2002-03. Besides meeting this need for system reliability, this project would enhance the United States' delivery of power to Canada as required under the Columbia River Treaty of 1961. BPA described and analyzed transmission route alternatives in a draft environmental impact statement (DEIS) released in June 2001. The DEIS identified a preferred alternative that would parallel an existing BPA transmission line through the Cedar River Municipal Watershed. BPA received over 700 comments from landowners, agencies, tribes and special interest groups on the DEIS. Many of the comments suggested BPA re-evaluate the range of alternatives considered and prepare a supplemental draft environmental impact statement (SDEIS). After reviewing the comments and refining the cost estimates associated with BPA's preferred alternative, BPA decided to prepare this SDEIS to re-evaluate alternatives not analyzed in detail in the DEIS. The added transmission alternatives, all located outside of the Cedar River Watershed, were initially considered but dropped from detailed analysis. They are identified as Alternatives A, B, C, and D. Alternatives A and C are located to the west of the Cedar River Watershed boundary. Alternatives B and D cross the Mt. Baker-Snoqualmie and Okanogan-Wenatchee National Forests. Under all transmission alternatives, Echo Lake Substation would be expanded about three acres to the east and new equipment to accommodate the new line would be installed. BPA is also considering a Non-Transmission Alternative and the No Action Alternative.

N /A

2003-01-10T23:59:59.000Z

100

Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

United States. Bonneville Power Administration.

1992-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Canby Area Service Project substation and associated transmission line. Environmental Assessment  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

Not Available

1992-02-01T23:59:59.000Z

102

Federal loan guaranty programs management report, Task III, Item 005. Tab I. Electric and hybrid vehicle research, development, and demonstration project. Tab II. Geothermal loan guaranty program  

DOE Green Energy (OSTI)

The guaranty program on electric and hybrid vehicle research, development, and demonstration considers two aspects of loan guaranties: (1) how is the loan guaranty, as an incentive device, best integrated into an overall project strategy, and (2) to what extent can cost-effectiveness measurements be introduced to the loan guaranty review and approval process. The report on the geothermal loan guaranty program is an overview of a large number of existing program elements which, in the opinion of the financial community or the historical record of predecessor loan guaranty programs, can be seen to be (or have potential to become) troublesome. Included are relevant administrative, regulatory, and managerial guidelines, commentary, and ideas. (MCW)

Not Available

1977-04-01T23:59:59.000Z

103

Final Environmental Assessment for the Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA -1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Final Environmental Assessment Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project DOE/EA-1456 U.S. Department of Energy Western Area Power Administration Rocky Mountain Region Loveland, Colorado October 2006 Table of Contents CH-MM & AU-CH Transmission Line Rebuild Table of Contents i Table of Contents Summary ......................................................................................................................................... 1 1.0 Introduction ..................................................................................................................

104

NQA-1 Requirements for Commercial Grade Item Acceptance: ICONE20-54738  

SciTech Connect

Objectives are: (1) Present the DOE Chemistry and Metallurgy Research Replacement (CMRR) Project Commercial Grade Item (CGI) Dedication Process; and (2) Present CMRR Project CGI Lessons-Learned.

Van Valkenburg, Taunia S. [Los Alamos National Laboratory; Holmes, Richard A. [Los Alamos National Laboratory; Tepley, Daniel J. [Los Alamos National Laboratory; Sandquist, Gary [APPLIED SCIENCE PROFESSIONALS

2012-07-19T23:59:59.000Z

105

Item Subject FAR Case  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Acquisition Circular (FAC) 2005-53 Item Subject FAR Case I. Equal Opportunity for Veterans 2009-007 II. Unique Procurement Instrument Identifier 2009-023 III. Uniform Suspension and Debarment Requirement 2009-036 IV. Extension of Sunset Date for Protests of Task and 2011-015 Delivery Orders V. Encouraging Contractor Policies to Ban Text Messaging 2009-028 While Driving. VI. TINA Interest Calculations 2009-034 Item I--Equal Opportunity for Veterans (FAR 2009-007) The interim rule, published September 29, 2010, is adopted as final with minor changes. A definition from the clause at FAR 52.222-35 for ``executive and senior management'' is added to FAR subpart 22.13. The interim rule implemented Department of

106

DOE/EIS-0332; McNary-John Day Transmission Line Project Draft Envrionmental Impact Statement(02/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

McNary-John Day Transmission Line Project McNary-John Day Transmission Line Project Draft Environmental Impact Statement (DOE/EIS -0332) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy (DOE) Cooperating Agencies: U.S. Department of Interior: U.S. Fish and Wildlife Service, Bureau of Land Management, and Bureau of Indian Affairs. Department of Army: Corps of Engineers. States Involved: Oregon and Washington Abstract: Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt- transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about

107

Microsoft Word - config item  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CITSS Configurable Item List CITSS Configurable Item List COTS Software CITSS Configurable Items Page 1 January 1998 CI # CITSS Function Vendor/Version Install Date Location Description/Notes SW-001 Data Base Server Operating System DEC Unix 4.0a 12/05/97 G'tn CA-001 SW-002 Application Server Operating System Novell 3.12 (250 User License) 10/01/97 G'tn C-065A SW-003 Relational Data Base System Oracle 7.3.3 for Unix 4.0a 12/05/97 G'tn CA-001 SW-004 Report Generation Tool Crystal Reports Professional 5.0 10/01/97 QO 370 SW-005 Paging Software WinBeep 2.12 10/01/97 QO 370 SW-006 Help Desk Software Applix Enterprise 6.01 10/01/97 G'tn C-065A SW-007 Web Enabling Software Applix WebLink 1.2.3 12/01/97 QO 370 SW-008 Knowledge Base Software ServiceWare, Inc. Knowledge Paks,

108

New technologies for item monitoring  

SciTech Connect

This report responds to the Department of Energy`s request that Sandia National Laboratories compare existing technologies against several advanced technologies as they apply to DOE needs to monitor the movement of material, weapons, or personnel for safety and security programs. The authors describe several material control systems, discuss their technologies, suggest possible applications, discuss assets and limitations, and project costs for each system. The following systems are described: WATCH system (Wireless Alarm Transmission of Container Handling); Tag system (an electrostatic proximity sensor); PANTRAK system (Personnel And Material Tracking); VRIS (Vault Remote Inventory System); VSIS (Vault Safety and Inventory System); AIMS (Authenticated Item Monitoring System); EIVS (Experimental Inventory Verification System); Metrox system (canister monitoring system); TCATS (Target Cueing And Tracking System); LGVSS (Light Grid Vault Surveillance System); CSS (Container Safeguards System); SAMMS (Security Alarm and Material Monitoring System); FOIDS (Fiber Optic Intelligence & Detection System); GRADS (Graded Radiation Detection System); and PINPAL (Physical Inventory Pallet).

Abbott, J.A. [EG & G Energy Measurements, Albuquerque, NM (United States); Waddoups, I.G. [Sandia National Labs., Albuquerque, NM (United States)

1993-12-01T23:59:59.000Z

109

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

110

The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata  

SciTech Connect

The Genomes On Line Database (GOLD) is a comprehensive resource for centralized monitoring of genome and metagenome projects worldwide. Both complete and ongoing projects, along with their associated metadata, can be accessed in GOLD through precomputed tables and a search page. As of September 2009, GOLD contains information for more than 5800 sequencing projects, of which 1100 have been completed and their sequence data deposited in a public repository. GOLD continues to expand, moving toward the goal of providing the most comprehensive repository of metadata information related to the projects and their organisms/environments in accordance with the Minimum Information about a (Meta)Genome Sequence (MIGS/MIMS) specification.

Liolios, Konstantinos; Chen, Amy; Mavromatis, Konstantinos; Tavernarakis, Nektarios; Hugenholtz, Phil; Markowitz, Victor; Kyrpides, Nikos C.

2009-09-01T23:59:59.000Z

111

User_CatalogItemAssign  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Self-Assign Items Self-Assign Items © 2011 SuccessFactors, Inc. - 1 - SuccessFactors Learning Confidential. All rights reserved. Job Aid: Self-Assign Items Purpose The purpose of this job aid is to guide users through the step-by-step process of using the catalog to locate and assign items to their To-Do List. Each task demonstrates a different method of searching the catalog. Task A. Locate and Self-Assign Items Using Simple Catalog Search Navigate to the Catalog search box above Easy Links. Enter keywords to search for in the item's title and description. Click the Search icon ( ). 2 1 3 Locate and Self-Assign Items Using Simple Catalog Search - 4 Steps Task A Locate and Self-Assign Items Using Advance Catalog Search - 7 Steps Task B

112

Text Line Extraction Using Adaptive Partial Projection for Palm Leaf Manuscripts from Thailand  

Science Conference Proceedings (OSTI)

Text line extraction is one of the critical steps in document analysis and optical character recognition (OCR) systems. The purpose of this study is to address the problem of text line extraction of ancient Thai manuscripts written on palm leaves, using ... Keywords: line extraction, line segmentation, historical document, document analysis system

Rapeeporn Chamchong, Chun Che Fung

2012-09-01T23:59:59.000Z

113

Glossary Balancing Item: Represents  

Gasoline and Diesel Fuel Update (EIA)

Balancing Balancing Item: Represents differences between the sum of the components of natural gas supply and the sum of the components of natural gas disposition. These differences may be due to quantities lost or to the effects of data-report- ing problems. Reporting problems include differences due to the net result of conversions of flow data metered at varying temperature and pressure bases and converted to a standard temperature and pressure base; the effect of vari- ations in company accounting and billing practices; differ- ences between billing cycle and calendar period time frames; and imbalances resulting from the merger of data- reporting systems that vary in scope, format, definitions, and type of respondents. Biomass Gas: A medium Btu gas containing methane and carbon dioxide, resulting from the action of microorganisms on organic materials such as a landfill. British Thermal

114

Suspect/Counterfeit and Defective Items  

NLE Websites -- All DOE Office Websites (Extended Search)

Items Home SuspectCounterfeit Items Defective Items Safety Advisories Safety Alerts Safety Bulletins SCI Points of Contact SCI Studies References Topical Search SCI-DI...

115

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

116

Political Studies student Tomas Borsa (`13) takes notes for his project, Line in the Sand. Photo: Tristan Becker (BA'10)  

E-Print Network (OSTI)

: Tristan Becker (BA'10) Inside the SSRL Part 3 · Chuck White's Unexpected Calling Tomas Borsa's Line Laboratories (SSRL) 2 arts science magazine & research SAFIHR An Interdisciplinary Gem SSRL facility maps the Social Sciences Research Laboratories (SSRL). The lab is currently at work on a project mapping primary

Patterson, William P.

117

DOE/EA-1635: Environmental Assessment for Pre-approval Review Williston to Tioga Transmission Line Project (March 2010)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 Williston to Tioga Transmission Line Project Environmental Assessment for Pre-approval Review DOE/EA - 1635 March 2010 Acronyms and Abbreviations °C degrees Celsius AAQS Ambient Air Quality Standards AIRFA American Indian Religious Freedom Act of 1978 amsl above mean sea level APLIC Avian Power Line Interaction Committee BEPC Basin Electric Power Cooperative BFE Base Flood Elevation BGEPA Bald and Golden Eagle Protection Act BMP best management practice CFR Code of Federal Regulations CO 2 carbon dioxide Council Advisory Council on Historic Preservation CRP Conservation Reserve Program

118

SF 6432-CI Commercial Items  

NLE Websites -- All DOE Office Websites (Extended Search)

or alcoholic beverages while on the premises; Control : SF 6432-CI Title: Standard Terms and Conditions for Commercial Items Owner: Procurement Policy & Quality Dept Release...

119

The Lick AGN Monitoring Project: Reverberation Mapping of Optical Hydrogen and Helium Recombination Lines  

E-Print Network (OSTI)

We have recently completed a 64-night spectroscopic monitoring campaign at the Lick Observatory 3-m Shane telescope with the aim of measuring the masses of the black holes in 12 nearby (z light curves for the Halpha, Hgamma, HeII 4686, and HeI 5876 emission lines and the time lags for the emission-line responses relative to changes in the continuum flux. Combining each emission-line time lag with the measured width of the line in the variable part of the spectrum, we determine a virial mass of the central supermassive black hole fro...

Bentz, Misty C; Barth, Aaron J; Yoshii, Yuzuru; Woo, Jong-Hak; Wang, Xiaofeng; Treu, Tommaso; Thornton, Carol E; Street, Rachel A; Steele, Thea N; Silverman, Jeffrey M; Serduke, Frank J D; Sakata, Yu; Minezaki, Takeo; Malkan, Matthew A; Li, Weidong; Lee, Nicholas; Hiner, Kyle D; Hidas, Marton G; Greene, Jenny E; Gates, Elinor L; Ganeshalingam, Mohan; Filippenko, Alexei V; Canalizo, Gabriela; Bennert, Vardha Nicola; Baliber, Nairn

2010-01-01T23:59:59.000Z

120

Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA proposes to build a single-circuit 500-kV transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to its Echo Lake Substation near North Bend, Washington. The proposed route for this line, also called Alternative 1, is about nine miles long. About five miles of the proposed route would go through the Cedar River Municipal Watershed. In addition, Echo Lake Substation would be expanded about three acres to the east and new equipment would be installed there to accommodate the new line (common to all transmission alternatives). This alternative was proposed because it would be located immediately parallel to an existing BPA existing 500-kV transmission line, the Raver-Echo Lake Transmission Line. Locating a new line next to an existing one reduces right-of-way (ROW) clearing needed for the new line and reduces the need for additional access roads. Lattice steel transmission towers would support the 500-kV transmission line. These structures average 135 feet high, with the average span between towers of about 1,150 feet.

N /A

2003-06-20T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

122

Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices  

Science Conference Proceedings (OSTI)

Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources.

NONE

1995-11-01T23:59:59.000Z

123

DOE/EIS-0332: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332-SA-1) (02/09/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 REPLY TO ATTN OF: KEC-4 SUBJECT: McNary-John Day Transmission Line Project Supplement Analysis (DOE/EIS-0332/SA-1) Mark Korsness, Project Manager, McNary-John Day Transmission Line Project Proposed Action: McNary-John Day Transmission Line - Review for significant new circumstances or information Proposed by: Bonneville Power Administration (BPA) Location: Umatilla and Sherman Counties, Oregon; Benton and Klickitat Counties, Washington. Background: In 2002, BPA completed the McNary-John Day Transmission Line Project Final Environmental Impact Statement (EIS) (DOE/EIS-0332). The Final EIS analyzed the potential impacts of constructing, maintaining, and operating a new 79-mile, 500-kV transmission line between BPA's McNary and John Day substations. This line was proposed in early 2000 to

124

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

125

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

1991-06-01T23:59:59.000Z

126

GRADUATE STUDENT TUITION ON RESEARCH AWARDS Graduate Student salaries and tuition costs are allowable costs on sponsored projects and are  

E-Print Network (OSTI)

are allowable costs on sponsored projects and are often a required cost. Policy BACKGROUND In accordance to their research projects must include a line item in the direct cost budget proposal for tuition remission based and budgets for non-competing renewals that include salary costs for a Research Project Assistant must also

Krovi, Venkat

127

EA-1952: Lane-Wendson No. 1 Transmission Line Rebuild Project; Lane County, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 41.3-mile Lane-Wendson No. 1 transmission line between Eugene and Florence, Oregon.

128

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, CO  

Energy.gov (U.S. Department of Energy (DOE))

DOEs Western Area Power Administration (Western) owns and operates two 16-mile, 115-kilovolt transmission lines on separate rights-of-way between Flatiron Reservoir (near Loveland, Colorado) and the town of Estes Park, Colorado. Western is preparing this EIS to evaluate the environmental impacts of a proposal to upgrade and co-locate these transmission lines, by removing one and abandoning its right-of-way, and rebuilding the other along the existing right-of-way as a double-circuit line (i.e., six conductors per pole). The USDA Forest Service, Arapaho and Roosevelt National Forest, is a cooperating agency in preparing the EIS to support its decision on whether to grant a Special Use Permit for parts of the transmission line located on National Forest lands.

129

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

130

EA-1880: Big Bend to Witten Transmission Line Project, South Dakota  

Energy.gov (U.S. Department of Energy (DOE))

The USDA Rural Utilities Service, with DOEs Western Area Power Administration as a cooperating agency, is preparing this EA to evaluate the environmental impacts of a proposal to construct a 70-mile long 230-kV single-circuit transmission line, a new Western Area Power Administration substation, an addition to the existing substation, and approximately 2 miles of 230-kV double-circuit transmission line, all in South Dakota.

131

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

132

EA-1946: Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

Bonneville Power Administration is preparing an EA to assess the potential environmental impacts of the proposed rebuild of the 23.90-mile Salem-Albany No. 1 and 27.85-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon.

133

Summit-Watertown transmission line project, South Dakota. Final Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) needs to rebuild the existing Summit-Watertown 115-kV transmission line, located in northeastern South Dakota, and western Minnesota. Nearly 60 percent of the existing facility was replaced in 1965 after severe ice-loading broke structures and wires. Because of the extensive loss of the line, surplus poles had to be used to replace the damaged H-frame structures. These were of varying sizes, causing improper structure loading. Additionally, the conductors and overhead shield wires have been spliced in numerous places. This provides additional space on these wires for icing and wind resistance, which in turn create problems for reliability. Finally, a progressive fungal condition has weakened the poles and, along with the improper loading, has created an unsafe condition for maintenance personnel and the general public.

1993-12-01T23:59:59.000Z

134

DOE/EA-1508: Environmental Assessment for the Beaver Creek-Hoyt-Erie Transmission Line Rebuild Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BC-HT-EE Mitigation Action Plan Nov. 2005 1 BC-HT-EE Mitigation Action Plan Nov. 2005 1 Mitigation Action Plan To Implement Mitigation Requirements for Beaver Creek-Hoyt-Erie Transmission Line Upgrade Project Morgan and Weld Counties, Colorado November 2005 BC-HT-EE Mitigation Action Plan Nov. 2005 2 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Construction Contractor Western Maintenance The contractor shall limit the movement of crews and equipment to the ROW, including access routes. The contractor shall limit movement on the ROW to minimize damage to residential yards, grazing land, crops, orchards, and property, and shall avoid marring the lands.

135

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

136

Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming  

DOE Green Energy (OSTI)

The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

Not Available

1990-07-01T23:59:59.000Z

137

Seminoe-Kortes transmission line/substation consolidation project, Carbon County, Wyoming  

SciTech Connect

The existing switchyards at Western Area Power Administration's (WESTERN) Seminoe and Kortes facilities, located approximately 40 miles northeast of Rawlines, Carbon County, Wyoming, were constructed in 1939 and 1951, respectively. The circuit breakers at these facilities are beyond or approaching their service life and need to be replaced. In addition, the switchyards have poor access for maintenance and replacement of equipment, and their locations create potential for oil spills into the North Platte River. WESTERN is proposing to consolidate the switchyard facilities into one new substation to provide easier access, restore proper levels of system reliability, and decrease the potential for oil contamination of the river. This environmental assessment (EA) was prepared to evaluate the impacts of the proposed Seminoe-Kortes Consolidation Project. 57 refs., 12 figs., 8 tabs.

1990-07-01T23:59:59.000Z

138

Keep in mind, that with formality, often comes more of a standing presence of a committee within DOE„it gets into DOEs system and becomes a budget line item as well  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1/28/2011 1/28/2011 TRIBAL LEADER FORUM: SOLAR ENERGY DEVELOPMENT IN THE SOUTHWEST December 19-20, 2011 SPA RESORT CASINO HOTEL IN PALM SPRINGS, CA 100 North Indian Canyon Drive Palm Springs, CA 92262 (888) 999-1995 The first of a series of planned DOE Office of Indian Energy-sponsored strategic energy development & investment forums, this Forum will provide an opportunity for Tribal leaders and executives to get real-time, regional market snapshots of: solar power purchasing, project financing options and structures which are getting closed, and related emerging issues or trends which are facilitating or obstructing projects from financial closing. This Forum will also provide a venue to Tribal leaders and executives to hear directly from each other regarding best practices in tribal

139

Breakout Items Action Items Fixed Price Contracting Topic Group Summaries  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Albuquerque Meeting - July 1997 Albuquerque Meeting - July 1997 Breakout Items Action Items Fixed Price Contracting Topic Group Summaries TOPIC GROUP SUMMARIES Routing * Group reviewed and approved fourth draft of working paper "Routing Issues Related to U.S. Department of Energy Radioactive Materials Transportation: Discussion and Analysis" * Group submitted working paper and draft list of "Stakeholder Recommendations" to TEC/WG and DOE Group reached consensus on three major routing-related issues: * DOE should develop standardized, cooperative approach to route selection * DOE needs to involve all stakeholders * DOE should submit final version of Group's working paper to other federal entities Future topics for consideration: * routing issues relevant to tribal entities and local jurisdictions

140

DOE/EIS-0325; Environmental Impact Statement for Schultz-Hanford Area Transmission Line Project (02/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement Summary Bonneville Power Administration U.S. Department of Energy Bureau of Land Management Bureau of Reclamation Fish and Wildlife Service U.S. Department of Interior Department of Army U.S. Department of Defense February 2002 Summary S-1 Summary In this Summary: * The Purposes and Need for Action * Alternatives * Affected Environment * Impacts This summary covers the major points of the Draft Environmental

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Notice of Intent to Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Federal Register / Vol. 63, No. 30 / Friday, February 13, 1998 / Notices taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a motion to intervene. Copies of his filing are on file with the Commission and are available for public inspection in the Public Reference Room. David P. Boergers, Acting Secretary. [FR Doc. 98-3659 Filed 2-12-98; 8:45 am] BILLING CODE 6717-01-M DEPARTMENT OF ENERGY Western Area Power Administration Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Sutter Power Plant and Transmission Line Project, California AGENCY: Western Area Power Administration, DOE. ACTION: Notice of intent to prepare an Environmental Impact Statement. SUMMARY: In accordance with Section

142

Mitigation Action Plan for the McNary-John Day Transmission Line Project,(DOE/EIS-0332)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Measures Adopted Measures Adopted for the McNary-John Day Transmission Line Project Land Use and Recreation Locate towers and roads so as not to disrupt irrigation circles, where possible. Locate structures and roads outside of agricultural fields, orchards, and vineyards, where possible. Coordinate with landowners for farm operations, including plowing, crop dusting, and harvesting. Redesign irrigation equipment and compensate landowner for additional reasonable costs where new right-of-way needs to be acquired. Compensate farmers for crop damage and restore compacted soils. Control weeds around the base of the towers. Keep gates and fences closed and in good repair to contain livestock. Repair damages to access roads caused by or arising out of Bonneville use, leaving roads in good or better

143

The hybrid reactor project based on the straight field line mirror concept  

SciTech Connect

The straight field line mirror (SFLM) concept is aiming towards a steady-state compact fusion neutron source. Besides the possibility for steady state operation for a year or more, the geometry is chosen to avoid high loads on materials and plasma facing components. A comparatively small fusion hybrid device with 'semi-poor' plasma confinement (with a low fusion Q factor) may be developed for industrial transmutation and energy production from spent nuclear fuel. This opportunity arises from a large fission to fusion energy multiplication ratio, Q{sub r} = P{sub fis}/P{sub fus}>>1. The upper bound on Q{sub r} is primarily determined by geometry and reactor safety. For the SFLM, the upper bound is Q{sub r} Almost-Equal-To 150, corresponding to a neutron multiplicity of k{sub eff}=0.97. Power production in a mirror hybrid is predicted for a substantially lower electron temperature than the requirement T{sub e} Almost-Equal-To 10 keV for a fusion reactor. Power production in the SFLM seems possible with Q Almost-Equal-To 0.15, which is 10 times lower than typically anticipated for hybrids (and 100 times smaller than required for a fusion reactor). This relaxes plasma confinement demands, and broadens the range for use of plasmas with supra-thermal ions in hybrid reactors. The SFLM concept is based on a mirror machine stabilized by qudrupolar magnetic fields and large expander tanks beyond the confinement region. The purpose of the expander tanks is to distribute axial plasma loss flow over a sufficiently large area so that the receiving plates can withstand the heat. Plasma stability is not relying on a plasma flow into the expander regions. With a suppressed plasma flow into the expander tanks, a possibility arise for higher electron temperature. A brief presentation will be given on basic theory for the SFLM with plasma stability and electron temperature issues, RF heating computations with sloshing ion formation, neutron transport computations with reactor safety margins and material load estimates, magnetic coil designs as well as a discussion on the implications of the geometry for possible diagnostics. Reactor safety issues are addressed and a vertical orientation of the device could assist passive coolant circulation. Specific attention is put to a device with a 25 m long confinement region and 40 cm plasma radius in the mid-plane. In an optimal case (k{sub eff}= 0.97) with a fusion power of only 10 MW, such a device may be capable of producing a power of 1.5 GW{sub th}.

Agren, O.; Noack, K.; Moiseenko, V. E.; Hagnestal, A.; Kaellne, J.; Anglart, H. [Uppsala University, Angstroem Laboratory, Uppsala University, Box 534, SE-751 21 Uppsala (Sweden); Institute of Plasma Physics, National Science Center 'Kharkiv Institute of Physics and Technology', 61108 Kharkiv (Ukraine); Uppsala University, Angstroem Laboratory, Uppsala University, Box 534, SE-751 21 Uppsala (Sweden); Royal Institute of Technology, Nuclear Reactor Technology, SE 100 44 Stockholm (Sweden)

2012-06-19T23:59:59.000Z

144

Balancing Item (Billion Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Balancing Item (Billion Cubic Feet) Balancing Item (Billion Cubic Feet) Balancing Item (Billion Cubic Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2001 140 143 41 166 30 -13 -8 -6 -26 -133 -76 -161 2002 -4 38 11 164 28 95 54 49 8 -124 -126 -129 2003 -86 76 118 43 30 16 80 57 12 -49 -136 -118 2004 -66 134 126 133 116 71 58 60 63 -13 -79 -142 2005 -41 104 14 131 60 58 62 66 59 -37 -114 -127 2006 49 -2 80 152 53 41 34 51 -2 -99 -101 -153 2007 -128 55 118 42 63 34 3 24 -3 -52 -185 -175 2008 -75 54 59 105 38 42 23 29 16 -51 -106 -132 2009 -21 104 59 52 30 -7 17 -1 -5 -92 -66 -173 2010 -46 9 109 102 19 61 2 16 21 -42 -61 -73 2011 -24 20 -4 17 -7 -11 17 7 36 -61 -32 -51

145

JOBAID-SELF ASSIGNING COURSES (ITEMS)  

Energy.gov (U.S. Department of Energy (DOE))

In this jobaid you will learn to use the Course Catalog, Browse Catalog, Recommended Items, Locate and Self-Assign Items (Courses) Using the Search Catalog features, Narrow Course Searches using...

146

Measuring Student Learning With Item Response Theory  

E-Print Network (OSTI)

We investigate short-term learning from hints and feedback in a Web-based physics tutoring system. Both the skill of students and the difficulty and discrimination of items were determined by applying item response theory ...

Lee, Young-Jin

147

Railroad crossing structures for spotted turtles: Massachusetts Bay Transportation Authority Greenbush rail line wildlife crossing demonstration project  

E-Print Network (OSTI)

Authority, Proposed Greenbush Rail Line: Wildlife ResourcesProposed Greenbush Rail Line: Conservation Management Plan.and federal agencies. Rail corridors pose unique design

Pelletier, Steven K.; Carlson, Lars; Nein, Daniel; Roy, Robert D.

2005-01-01T23:59:59.000Z

148

El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment  

SciTech Connect

This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

Not Available

1992-04-01T23:59:59.000Z

149

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

150

The Genomes On Line Database (GOLD) in 2007: status of genomic and metagenomic projects and their associated metadata  

E-Print Network (OSTI)

constantly monitoring genome sequencing projects worldwideas part of the Whole Genome Sequencing (WGS) project.large scale microbial genome sequencing programs have been

Liolios, Konstantinos

2008-01-01T23:59:59.000Z

151

The Genomes On Line Database (GOLD) in 2009: status of genomic and metagenomic projects and their associated metadata  

E-Print Network (OSTI)

large-scale microbial genome sequencing initiatives, e.g. ,in the history of genome sequencing projects: the completedfor publication of genome sequencing projects require the

Liolios, Konstantinos

2010-01-01T23:59:59.000Z

152

EA-1931: Keeler-Forest Grove, Forest Grove-Tillamook Line No. 1 Line Rebuild Project, Washington and Tillamook Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA will evaluate the potential environmental impacts of a BPA proposal to rebuild its 58 mile long, 115 kilovolt (kV) wood pole Keeler-Forest Grove and Forest Grove-Tillamook transmission lines. The deteriorated transmission line structures (wood pole structures, switches, cross arms, braces, guys, anchors, insulator assemblies and conductor) need to be replaced in order to maintain reliable electrical service, avoid risks to the public, and ensure worker safety.

153

Toys and Items Brought from Home  

Science Conference Proceedings (OSTI)

... child wants to bring in a toy from home, please adhere to the following procedures. Do not send in any items of great sentimental or monetary value. ...

2010-10-05T23:59:59.000Z

154

INL Wind Farm Project Description Document  

DOE Green Energy (OSTI)

The INL Wind Farm project proposes to install a 20 MW to 40 MW wind farm on government property, consisting of approximately ten to twenty full-sized (80-meter hub height) towers with 2 MW turbines, and access roads. This includes identifying the optimal turbine locations, building access roads, and pouring the tower foundations in preparation for turbine installation. The project successfully identified a location on INL lands with commercially viable wind resources (i.e., greater than 11 mph sustained winds) for a 20 to 40 MW wind farm. Additionally, the proposed Wind Farm was evaluated against other General Plant Projects, General Purpose Capital Equipment projects, and Line Item Construction Projects at the INL to show the relative importance of the proposed Wind Farm project.

Gary Siefert

2009-07-01T23:59:59.000Z

155

Clustering local frequency items in multiple databases  

Science Conference Proceedings (OSTI)

Frequent items could be considered as a basic type of patterns in a database. In the context of multiple data sources, most of the global patterns are based on local frequency items. A multi-branch company transacting from different branches often needs ... Keywords: Association, Clustering, Data mining, Measure of association, Multi-database mining

Animesh Adhikari

2013-07-01T23:59:59.000Z

156

Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Exploring the Standard Model Exploring the Standard Model       You've heard a lot about the Standard Model and the pieces are hopefully beginning to fall into place. However, even a thorough understanding of the Standard Model is not the end of the story but the beginning. By exploring the structure and details of the Standard Model we encounter new questions. Why do the most fundamental particles have the particular masses we observe? Why aren't they all symmetric? How is the mass of a particle related to the masses of its constituents? Is there any other way of organizing the Standard Model? The activities in this project will elucidate but not answer our questions. The Standard Model tells us how particles behave but not necessarily why they do so. The conversation is only beginning. . . .

157

DOE/EA-1596: Finding of No Significant Impact for Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota (02/18/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WESTERN AREA POWER ADMINISTRATION WESTERN AREA POWER ADMINISTRATION UPPER GREAT PLAINS CUSTOMER SERVICE REGION FINDING OF NO SIGNIFICANT IMPACT Belfield to Rhame Transmission Line Project Stark, Slope, and Bowman Counties, North Dakota DOEIEA-1596 AGENCY: U.S. Department of Energy (DOE), Western Area Power Administration (Western) ACTION: Finding of No Significant Impact SUMMARY: Basin Electric Power Cooperative (Basin) has requested to interconnect their proposed new Belfield to Rhame 230-kilovolt (kV) transmission line and new Rhame Substation (Project) to the Western Area Power Administration's (Western) transmission system at Western's existing Belfield Substation. Under its Open Access Transmission Service Tariff (Tariff), Western is required to respond to Basin's interconnection requests. Western's Tariff

158

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

159

Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses  

Science Conference Proceedings (OSTI)

Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments.

NONE

1995-11-01T23:59:59.000Z

160

Greener Commercial A/C Units Becoming a Cool Item | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Greener Commercial A/C Units Becoming a Cool Item Greener Commercial A/C Units Becoming a Cool Item Greener Commercial A/C Units Becoming a Cool Item July 1, 2010 - 5:11pm Addthis Greener Commercial A/C Units Becoming a Cool Item Stephen Graff Former Writer & editor for Energy Empowers, EERE A new federal tax credit is helping McQuay International expand its line of energy-efficient HVAC products at two of its plants and bring back furloughed workers. With the help of a 48C manufacturing tax credit worth $2 million under the American Recovery and Reinvestment Act, McQuay's Minnesota and Virginia plants have been or will be upgraded and expanded to produce new lines of energy efficient products. The tax credit is playing a role, but offering a bigger-and more efficient-selection of HVAC products also came down to basic economics:

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Modeling uncertainty in the New York City no. 7 subway line extension project using Decision Aids for Tunnelling (DAT)  

E-Print Network (OSTI)

Given the frequent cost overruns and schedule delays associated with underground construction projects, it is imperative that a detailed estimate of both be developed and considered prior to starting construction. The ...

Hung, Vinnie

2012-01-01T23:59:59.000Z

162

Final Technical Report on STTR Project DE-FG02-06ER86281 Particle Tracking in Matter-Dominated Beam Lines (G4beamline)  

SciTech Connect

This project has been for software development of the G4beamline [1] program, which is a particle-tracking simulation program based on the Geant4 toolkit [2], optimized for beam lines. This program can perform more realistic simulations than most alternatives, while being significantly easier to use by physicists. This project has fostered the general acceptance of G4beamline within the muon community, and has assisted in expanding its role outside that community. During this project, the G4beamline user community has grown from about a half-dozen users to more than 200 users around the world. This project also validated our business decision to keep G4beamline an open-source program, judging that an STTR project would provide more development resources than would marketing and selling the program. G4beamline is freely available to the physics community, and has been well validated against experiments and other codes within its domain. Muons, Inc. continues to support and develop the program, and a major part of the company??s continued success and growth is directly related to our expertise in applying this program to interesting applications.

Muons, Inc.

2011-05-19T23:59:59.000Z

163

The Lick AGN Monitoring Project: Broad-Line Region Radii and Black Hole Masses from Reverberation Mapping of Hbeta  

E-Print Network (OSTI)

We have recently completed a 64-night spectroscopic monitoring campaign at the Lick Observatory 3-m Shane telescope with the aim of measuring the masses of the black holes in 12 nearby (z light curves for the objects in this sample and the subsequent Hbeta time lags for the nine objects where these measurements were possible. The Hbeta lag time is directly related to the size of the broad-line region, and by combining the lag time with the measured width of the Hbeta emission line in the variable part of the spectrum, we determine the virial mass of the central supe...

Bentz, Misty C; Barth, Aaron J; Baliber, Nairn; Bennert, Nicola; Canalizo, Gabriela; Filippenko, Alexei V; Ganeshalingam, Mohan; Gates, Elinor L; Greene, Jenny E; Hidas, Marton G; Hiner, Kyle D; Lee, Nicholas; Li, Weidong; Malkan, Matthew A; Minezaki, Takeo; Sakata, Yu; Serduke, Frank J D; Silverman, Jeffrey M; Steele, Thea N; Stern, Daniel; Street, Rachel A; Thornton, Carol E; Treu, Tommaso; Wang, Xiaofeng; Woo, Jong-Hak; Yoshii, Yuzuru

2009-01-01T23:59:59.000Z

164

On-Line Use of Three-Dimensional Marker Trajectory Estimation From Cone-Beam Computed Tomography Projections for Precise Setup in Radiotherapy for Targets With Respiratory Motion  

Science Conference Proceedings (OSTI)

Purpose: To develop and evaluate accurate and objective on-line patient setup based on a novel semiautomatic technique in which three-dimensional marker trajectories were estimated from two-dimensional cone-beam computed tomography (CBCT) projections. Methods and Materials: Seven treatment courses of stereotactic body radiotherapy for liver tumors were delivered in 21 fractions in total to 6 patients by a linear accelerator. Each patient had two to three gold markers implanted close to the tumors. Before treatment, a CBCT scan with approximately 675 two-dimensional projections was acquired during a full gantry rotation. The marker positions were segmented in each projection. From this, the three-dimensional marker trajectories were estimated using a probability based method. The required couch shifts for patient setup were calculated from the mean marker positions along the trajectories. A motion phantom moving with known tumor trajectories was used to examine the accuracy of the method. Trajectory-based setup was retrospectively used off-line for the first five treatment courses (15 fractions) and on-line for the last two treatment courses (6 fractions). Automatic marker segmentation was compared with manual segmentation. The trajectory-based setup was compared with setup based on conventional CBCT guidance on the markers (first 15 fractions). Results: Phantom measurements showed that trajectory-based estimation of the mean marker position was accurate within 0.3 mm. The on-line trajectory-based patient setup was performed within approximately 5 minutes. The automatic marker segmentation agreed with manual segmentation within 0.36 {+-} 0.50 pixels (mean {+-} SD; pixel size, 0.26 mm in isocenter). The accuracy of conventional volumetric CBCT guidance was compromised by motion smearing ({<=}21 mm) that induced an absolute three-dimensional setup error of 1.6 {+-} 0.9 mm (maximum, 3.2) relative to trajectory-based setup. Conclusions: The first on-line clinical use of trajectory estimation from CBCT projections for precise setup in stereotactic body radiotherapy was demonstrated. Uncertainty in the conventional CBCT-based setup procedure was eliminated with the new method.

Worm, Esben S., E-mail: esbeworm@rm.dk [Department of Oncology, Aarhus University Hospital, Aarhus (Denmark); Department of Medical Physics, Aarhus University Hospital, Aarhus (Denmark); Hoyer, Morten; Fledelius, Walther [Department of Oncology, Aarhus University Hospital, Aarhus (Denmark); Nielsen, Jens E.; Larsen, Lars P. [Department of Radiology, Aarhus University Hospital, Aarhus (Denmark); Poulsen, Per R. [Department of Oncology, Aarhus University Hospital, Aarhus (Denmark); Institute of Clinical Medicine, Aarhus University (Denmark)

2012-05-01T23:59:59.000Z

165

Plant Support Engineering: Counterfeit and Fraudulent Items  

Science Conference Proceedings (OSTI)

In today's global marketplace, an increasing percentage of our spare and replacement items (and their contents) originates outside the United States. Enormous growth in the manufacturing capabilities of regions such as Asia has resulted in an increase in the number of fraudulent and counterfeit items. We frequently hear of examples such as baby formula, dog food, lead paint in toys, etc. An increasing number of more industrial examples such as tools, structural steel, bearings, and electronics are also b...

2010-10-04T23:59:59.000Z

166

Calorimetry of low mass Pu239 items  

SciTech Connect

Calorimetric assay has the reputation of providing the highest precision and accuracy of all nondestructive assay measurements. Unfortunately, non-destructive assay practitioners and measurement consumers often extend, inappropriately, the high precision and accuracy of calorimetric assay to very low mass items. One purpose of this document is to present more realistic expectations for the random uncertainties associated with calorimetric assay for weapons grade plutonium items with masses of 200 grams or less.

Cremers, Teresa L [Los Alamos National Laboratory; Sampson, Thomas E [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

167

Roseville Direct Service 230 kV Transmission Line Project, Sacramento and Placer Counties, California: Environmental assessment  

SciTech Connect

At present, the only transmission line serving the City of Roseville is operated by Pacific Gas and Electric Company (PG and E), which serves the City's Berry Street substation with a 60-kV circuit from the company's own Atlantic Street substation. Western pays wheeling charges to PG and E for use of their lines to deliver power to its customers which cannot be served directly. PG and E has informed Roseville that additional system facilities are required to meet the City's firm transmission requirements in excess of 69 megawatt peak. They proposed to build a new 230-kV line and transformer bank at a cost of $10.9 million which the City would have to pay, in addition to the wheeling charges Western would be charged to use the PG and E line. The City's preferred alternative is to have Western construct a direct 239-kV service from its Elverta substation to the Berry Street substation. This would save the city money in construction capital cost, result in more transmission capacity and eliminate the present wheeling costs charged to Western. Mitigation recommendations are included.

1986-06-01T23:59:59.000Z

168

Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) Lining Main Canal Preliminary  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a capital renovation project proposed by Maverick County Water Control and Improvement District No. 1 to the Bureau of Reclamation and North American Development Bank. The proposed project involves lining 3 miles of the Main Canal with a urethane lining and a concrete anchor and ballast system. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 8,084 ac-ft of water per year and 2,041,095,338 BTUs (598,211 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $33.37 per ac-ft. The calculated economic and financial cost of energy savings is estimated to be $0.0001322 per BTU ($0.451 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $25.97 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001029 per BTU ($0.351 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -13.65.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2004-01-01T23:59:59.000Z

169

Economic and Conservation Evaluation of Capital Renovation Projects: Maverick County Water Control and Improvement District No. 1 (Eagle Pass) Lining Main Canal Final  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for a capital renovation project proposed by Maverick County Water Control and Improvement District No. 1 to the Bureau of Reclamation and North American Development Bank. The proposed project involves lining 3 miles of the Main Canal with a urethane lining and a concrete anchor and ballast system. Both nominal and real estimates of water and energy savings and expected economic and financial costs of those savings are identified throughout the anticipated 49-year useful life for the proposed project. Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Annual water and energy savings forthcoming from the total project are estimated, using amortization procedures, to be 8,084 ac-ft of water per year and 2,041,095,338 BTUs (598,211 kwh) of energy per year. The calculated economic and financial cost of water savings is estimated to be $33.37 per ac-ft. The calculated economic and financial cost of energy savings is estimated to be $0.0001322 per BTU ($0.451 per kwh). In addition, expected real (rather than nominal) values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the United States Public Law 106-576 legislation. The initial construction cost per ac-ft of water savings measure is $25.97 per ac-ft of water savings. The initial construction cost per BTU (kwh) of energy savings measure is $0.0001029 per BTU ($0.351 per kwh). The ratio of initial construction costs per dollar of total annual economic savings is estimated to be -13.65.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.

2004-04-01T23:59:59.000Z

170

PV Manufacturing R&D Project Status and Accomplishments under 'In-Line Diagnostics and Intelligent Processing' and 'Yield, Durability and Reliability': Preprint  

DOE Green Energy (OSTI)

The PV Manufacturing R&D (PVMR&D) Project conducts cost-shared research and development programs with U.S. PV industry partners. There are currently two active industry partnership activities. ''In-line Diagnostics and Intelligent Processing'', launched in 2002, supports development of new in-line diagnostics and monitoring with real-time feedback for optimal process control and increased yield in the fabrication of PV modules, systems, and other system components. ''Yield, Durability and Reliability'', launched in late 2004, supports enhancement of PV module, system component, and complete system reliability in high-volume manufacturing. A second key undertaking of the PVMR&D Project is the collection and analysis of module production cost-capacity metrics for the U.S. PV industry. In the period from 1992 through 2005, the average module manufacturing cost in 2005 dollars fell 54% (5.7% annualized) to $2.74/Wp, and the capacity increased 18.6-fold (25% annualized) to 253 MW/yr. An experience curve analysis gives progress ratios of 87% and 81%, respectively, for U.S. silicon and thin-film module production.

Friedman, D. J.; Mitchell, R. L.; Keyes, B. M.; Bower, W. I.; King, R.; Mazer, J.

2006-05-01T23:59:59.000Z

171

Line Management Understanding of QA and Oversight | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

work being done correctly, timely, and safely. Input could be from recent assessments, trends, Performance Metrics, number of open action items, recurring issues, etc. Line...

172

AVOID BECOMING A VICTIM OF COUNTERFEIT ITEMS  

SciTech Connect

In today's globalized economy, we cannot live without imported products. Most people do not realize how thin the safety net of regulation and inspection really is. Less than three percent of imported products receive any form of government inspection prior to sale. Avoid flea markets, street vendors and deep discount stores. The sellers of counterfeit wares know where to market their products. They look for individuals who are hungry for a brand name item but do not want to pay a brand name price for it. The internet provides anonymity to the sellers of counterfeit products. Unlike Europe, U.S. law does not hold internet-marketing organizations, responsible for the quality of the products sold on their websites. These organizations will remove an individual vendor when a sufficient number of complaints are lodged, but they will not take responsibility for the counterfeit products you may have purchased. EBay has a number of counterfeit product guides to help you avoid being a victim of the sellers of these products. Ten percent of all medications taken worldwide are counterfeit. If you do buy medications on-line, be sure that the National Association of Boards of Pharmacy Verified Internet Pharmacy Practice Sites (VIPPS) recommends the pharmacy you choose to use. Inspect all medication purchases and report any change in color, shape, imprinting or odor to your pharmacist. If you take generic medications these attributes may change from one manufacturer to another. Your pharmacist should inform you of any changes when you refill your prescription. If they do not, get clarification prior to taking the medication. Please note that the Federal Drug Administration (FDA) does not regulate supplements. The FDA only steps in when a specific supplement proves to cause physical harm or contains a regulated ingredient. Due to counterfeiting, Underwriters Laboratories (UL) changed their label design three times since 1996. The new gold label should be attached to the cord or body of most office and home electrical products (please see the picture to the left). Holiday lights may have the UL marking in red or green instead of the universal black. A red UL mark indicates the product is approved for outdoor as well as indoor service. The green UL mark indicates the product is only to be used indoors. A small number of home electrical products may bear an Interteck (ETL) approval. This label is also acceptable. An Interteck label includes black print on a white background bearing the circular ETL logo. Most manufacturers are proud of their products and strive to gain name recognition as well as foster repeat business. This is not true of counterfeiters. The very first thing most counterfeiters try to do is make their products untraceable. Their products may bear the nation of origin but that is all. This is a common practice with metal components such as pipe fittings and flanges. This is also true of hoisting and rigging equipment such as shackles, turnbuckles and chain. Sadly, this has also occurred with the purchase of some safety equipment such as arc-flash retardant coveralls. Learn the national standards associated with products you are purchasing. Clearly specify these requirements on the procurements you make.

WARRINER RD

2011-07-13T23:59:59.000Z

173

8/16/2012 Texas Tech University Item Dept. Lab Name Cost  

E-Print Network (OSTI)

Student Project Work Benches ME Machine Shop $10,398 BOD Incubator CEE Environmental $6,000 Centrifugal Pump Demonstration Unit CEE Fluids $13,600 Centrifuge CEE Environmental $8,000 Concrete Compression - alphabetical by item Fourier Transform Infrared Spectrometer ChemE Undergraduate Teaching Labs $40,000 Gas

Gelfond, Michael

174

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 1. REQUISITION NUMBER SP0600-06-0525 PAGE 1 OF 19 2. CONTRACT NUMBER 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 5. SOLICITATION NUMBER SP0600-06-Q-0408 6. SOLICITATION ISSUE DATE March 8, 2006 7. FOR SOLICITATION INFORMATION CALL: a.NAME Leslie Simpson (703) 767-8536 b. TELEPHONE NUMBER (no collect calls) Phone: See Block 7A Fax: (703) 767-8757 8. OFFER DUE DATE/LOCAL TIME March 15, 2006, 12:00 Noon, Local Time, Fort Belvoir, Virginia 9. ISSUED BY CODE SP0600 10. THIS ACQUISITION IS UNRESTRICTED ⌧ SET ASIDE 100 % FOR

175

Safeguard Application Options for the Laser-Based Item Monitoring System (LBIMS)  

SciTech Connect

Researchers at Oak Ridge National Laboratory (ORNL) are developing a Laser-Based Item Monitoring System (LBIMS) for advanced safeguards at nuclear facilities. LBIMS uses a low-power laser transceiver to monitor the presence and position of items with retroreflective tags. The primary advantages of LBIMS are its scalability to continuously monitor a wide range of items, its ability to operate unattended, its low cost of implementation, and its inherent information security due to its line-of-sight and non-broadcasting operation. The primary proposed safeguard application of LBIMS is described in its name: item monitoring. LBIMS could be implemented in a storage area to continuously monitor containers of nuclear material and the area in which they are stored. The system could be configured to provide off-site notification if any of the containers are moved or removed or if the area is accessed. Individual tags would be used to monitor storage containers, and additional tags could be used to record information regarding secondary storage units and room access. The capability to register small changes in tag position opens up the possibility of several other uses. These include continuously monitoring piping arrangements for design information verification or recording equipment positions for other safeguards systems, such as tracking the opening and closing of autoclaves as part of a cylinder tracking system or opening and closing valves on a sample or product take-off line. Combined with attribute tags, which transmit information from any kind of sensor by modulating the laser signal, LBIMS provides the capability to wirelessly and securely collect safeguards data, even in areas where radio-frequency or other wireless communication methods are not practicable. Four application types are described in this report: static item monitoring, in-process item monitoring with trigger tags, multi-layered integration with trigger tags, and line-of-sight data transfer with attribute tags. Field trials for each of these applications are described.

Laughter, Mark D [ORNL

2008-10-01T23:59:59.000Z

176

Planning and Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

177

PARS II - Integrated Project Team Meeting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Project Team Meeting Integrated Project Team Meeting John Makepeace (OECM) Ken Henderson (EES), Norm Ayers (EES) November 19, 2009 2 2 Agenda * Brief Review Last Meeting * List of Action Items * Project Milestones * Communications Channels for Deployment * Requesting Contacts for EM Group 1 & 2 Projects * Information Package to Contractor * Letter of Introduction * CPP Upload Document * Project Data Template * New Action Items * List of EM Group 1 & 2 Projects 3 Action Items Item Action Item Status 1 EES will write the marketing cover letter for the Information Package. C 2 EES will deliver the Preliminary Information Package to OECM by Monday Nov 16, close of business, for review. C 3 A placeholder of COB Tuesday Nov 17 was established for EES to give OECM the Information Package. C 4 Distribution of the package will commence after review by OECM.

178

Nuclear Energy Research Initiative Project No. 02 103 Innovative Low Cost Approaches to Automating QA/QC of Fuel Particle Production Using On Line Nondestructive Methods for Higher Reliability Final Project Report  

SciTech Connect

This Nuclear Energy Research Initiative (NERI) project was tasked with exploring, adapting, developing and demonstrating innovative nondestructive test methods to automate nuclear coated particle fuel inspection so as to provide the United States (US) with necessary improved and economical Quality Assurance and Control (QA/QC) that is needed for the fuels for several reactor concepts being proposed for both near term deployment [DOE NE & NERAC, 2001] and Generation IV nuclear systems. Replacing present day QA/QC methods, done manually and in many cases destructively, with higher speed automated nondestructive methods will make fuel production for advanced reactors economically feasible. For successful deployment of next generation reactors that employ particle fuels, or fuels in the form of pebbles based on particles, extremely large numbers of fuel particles will require inspection at throughput rates that do not significantly impact the proposed manufacturing processes. The focus of the project is nondestructive examination (NDE) technologies that can be automated for production speeds and make either: (I) On Process Measurements or (II) In Line Measurements. The inspection technologies selected will enable particle quality qualification as a particle or group of particles passes a sensor. A multiple attribute dependent signature will be measured and used for qualification or process control decisions. A primary task for achieving this objective is to establish standard signatures for both good/acceptable particles and the most problematic types of defects using several nondestructive methods.

Ahmed, Salahuddin; Batishko, Charles R.; Flake, Matthew; Good, Morris S.; Mathews, Royce; Morra, Marino; Panetta, Paul D.; Pardini, Allan F.; Sandness, Gerald A.; Tucker, Brian J.; Weier, Dennis R.; Hockey, Ronald L.; Gray, Joseph N.; Saurwein, John J.; Bond, Leonard J.; Lowden, Richard A.; Miller, James H.

2006-02-28T23:59:59.000Z

179

California Natural Gas Balancing Item (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Balancing Item (Million Cubic Feet) California Natural Gas Balancing Item (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's...

180

New Mexico Natural Gas Balancing Item (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Balancing Item (Million Cubic Feet) New Mexico Natural Gas Balancing Item (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's...

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

(DOE/EIS-0128-SA-02): Supplement Analysis: Los Banos-Gates (Path 15) Transmission line project changes to alignment, access road stream crossing, and basis for Supplemental EIS Determination  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Los Banos-Gates (Path 15) Transmission Line Project DOE/EIS-0128-SA02 Western Area Power Administration Sierra Nevada Customer Service Region U.S. Department of Energy Changes to Alignment, Access Road Stream Crossing, and Basis for Supplemental Environmental Impact Statement Determination Background The Los Banos-Gates 500-kilovolt Transmission Line project was originally proposed as part of the California-Oregon Transmission Project in the 1980s. These two projects were the subject of a single set of documents prepared in 1986 (draft) and 1988 (final) that served as the Environmental Impact Statement (EIS) under the National Environmental Policy Act and the Environmental Impact Report (EIR) under the California Environmental Quality Act. The EIS is entitled "Final Environmental Impact

182

Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Repair flowline 61-66-SX-3 Repair flowline 61-66-SX-3 DOE Code: Project Lead: Wes Riesland NEPA COMPLIANCE SURVEY # 291 Project Information Date: 3/1 1/2010 Contractor Code: Project Overview In order to repair this line it was decided to trench a line aproximately 100 feet and tie it into the line at 71-3- 1. What are the environmental sx-3. This will get us out of the old flow line which has been repaired 5-6 times. this will mitigate the chances impacts? of having spills in the future. 2. What is the legal location? This flowline runs from the well77-s-1 0 to the B-2-10 manifold.+ "/-,~?X3 3. What is the duration of the project? Approximately 10 hours(1 day) to complete 4. What major equipment will be used backhoe and operator and one hand if any (work over rig. drilling rig.

183

Project 265  

NLE Websites -- All DOE Office Websites (Extended Search)

The goal of this project is to develop an on-line instrument using multi- wavelength lasers that is capable of characterizing particulate matter (PM) generated in fossil energy...

184

Guide to good practices for the development of test items  

Science Conference Proceedings (OSTI)

While the methodology used in developing test items can vary significantly, to ensure quality examinations, test items should be developed systematically. Test design and development is discussed in the DOE Guide to Good Practices for Design, Development, and Implementation of Examinations. This guide is intended to be a supplement by providing more detailed guidance on the development of specific test items. This guide addresses the development of written examination test items primarily. However, many of the concepts also apply to oral examinations, both in the classroom and on the job. This guide is intended to be used as guidance for the classroom and laboratory instructor or curriculum developer responsible for the construction of individual test items. This document focuses on written test items, but includes information relative to open-reference (open book) examination test items, as well. These test items have been categorized as short-answer, multiple-choice, or essay. Each test item format is described, examples are provided, and a procedure for development is included. The appendices provide examples for writing test items, a test item development form, and examples of various test item formats.

NONE

1997-01-01T23:59:59.000Z

185

Feed mechanism and method for feeding minute items  

DOE Patents (OSTI)

A feeding mechanism and method for feeding minute items, such as capacitors, resistors, or solder preforms. The mechanism is adapted to receive a plurality of the randomly-positioned and randomly-oriented extremely small or minute items, and to isolate, orient, and position the items in a specific repeatable pickup location wherefrom they may be removed for use by, for example, a computer-controlled automated assembly machine. The mechanism comprises a sliding shelf adapted to receive and support the items; a wiper arm adapted to achieve a single even layer of the items; and a pushing arm adapted to push the items into the pickup location. The mechanism can be adapted for providing the items with a more exact orientation, and can also be adapted for use in a liquid environment.

Stringer, Timothy Kent; Yerganian, Simon Scott

2012-11-06T23:59:59.000Z

186

DOE Commercial Building Partnership Program - LBNL Project Introductio...  

NLE Websites -- All DOE Office Websites (Extended Search)

Program - LBNL Project Introductions (Includes brief update on Commercial Buildings User Facility & other items) NOTICE Due to the current lapse of federal funding, Berkeley...

187

GSA Data Repository item 0000 Supplemental data for  

E-Print Network (OSTI)

GSA Data Repository item 0000 Supplemental data for Exhumation History of the Alam Kuh Area Data Repository item 0000 Item PDF file name U-Pb data table for Akapol zircon samples (97AK101, 97AK102, and 19-12-1) Akapol_zircon_data.PDF U-Pb data table for Alam Kuh zircon samples (19-29-1) Alam_Kuh_zircon_data

Harrison, Mark

188

Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Power Projects Contact SN Customers Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates You are here: SN Home page > About SNR Power Projects Central Valley: In California's Central Valley, 18 dams create reservoirs that can store 13 million acre-feet of water. The project's 615 miles of canals irrigate an area 400 miles long and 45 miles wide--almost one third of California. Powerplants at the dams have an installed capacity of 2,099 megawatts and provide enough energy for 650,000 people. Transmission lines total about 865 circuit-miles. Washoe: This project in west-central Nevada and east-central California was designed to improve the regulation of runoff from the Truckee and Carson river systems and to provide supplemental irrigation water and drainage, as well as water for municipal, industrial and fishery use. The project's Stampede Powerplant has a maximum capacity of 4 MW.

189

Memory test time reduction by interconnecting test items  

Science Conference Proceedings (OSTI)

The idea is to interconnect test items to reuse memory states left from the previous test item for saving initialization and verification sequences. Meanwhile, signal settling time of the tester between two consecutive test items being applied can also ... Keywords: NP-hard problem, constraints, graph theory, initialization sequences, integer linear programming model, integer programming, integrated circuit testing, integrated memory circuits, interconnection problem, iterations, linear programming, memory test time reduction, rural Chinese postman problem, signal settling time, successive ILP models, test items interconnection, verification sequences

Wen-Jer Wu; Chuan Yi Tang

2000-12-01T23:59:59.000Z

190

Suspect and Counterfeit Items Memo | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(SCI), specifically electronic components and integrated circuits, is an increasing problem throughout the nuclear industry. Suspect and Counterfeit Items Memo More Documents...

191

SF6432-CI (02-01-12) Commercial Items  

NLE Websites -- All DOE Office Websites (Extended Search)

who will enter a government site to perform Control : SF 6432-CI Title: Standard Terms and Conditions for Commercial Items Owner: Procurement Policy & Quality Dept Release...

192

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission Line and Substation...

193

Amended Notice of Intent for the Northern Pass Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

194

Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/Olinda-Elverta 230-Kilovolt Double-Circuit Transmission Line, June 15, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 Federal Register / Vol. 64, No. 114 / Tuesday, June 15, 1999 / Notices DEPARTMENT OF ENERGY Western Area Power Administration Record of Decision for the Interconnection of the Sutter Power Project With the Western Area Power Administration's Keswick-Elverta/ Olinda-Elverta 230-Kilovolt Double- Circuit Transmission Line AGENCY: Western Area Power Administration, DOE. ACTION: Record of decision. SUMMARY: The Western Area Power Administration (Western) prepared this Record of Decision in response to a request submitted to Western for a direct interconnection of Calpine Corporation's (Calpine) proposed Sutter Power Project (SPP) with Western's electric transmission system. In response to this request, Western completed an Interconnection Feasibility Study that determined that

195

Independent Verification Survey Report for the Offsite Portion of the Potential Release Site-7 Abandoned Sanitary Line, Miamisburg Closure Project, Miamisburg, Ohio  

SciTech Connect

The ORISE objective was to confirm that the remedial action process implemented by the contractor was in accordance with the PRS-7 Work Package. Following removal of the sanitary line, the soil beneath the line would be sampled to determine if remediation was required (ARC 2007a).

P.C. Weaver

2008-08-15T23:59:59.000Z

196

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

which is a cooperating agency in the project. The proposed project would: Rebuild aging and deteriorating transmission lines Reduce the number of linear miles of transmission...

197

U.S. Natural Gas Balancing Item (Million Cubic Feet)  

U.S. Energy Information Administration (EIA) Indexed Site

Balancing Item (Million Cubic Feet) U.S. Natural Gas Balancing Item (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 1990's 634,809...

198

BWRVIP-272: BWR Vessel and Internals Project, BWR/4 Bottom Head Drain Line Radiographic Examination - Field Trial at KKM Nuclear Station  

Science Conference Proceedings (OSTI)

This report describes newly developed remotely operated radiography technology for the examination of the vessel drain line in a boiling water reactor Model 4 (BWR/4). The technology targets the wall-thickness examination of the elbow and piping section that is deemed most susceptible to flow-accelerated corrosion (FAC) attack.BackgroundThe BWR vessel bottom head drain line has been identified as being susceptible to FAC because of its material of ...

2013-03-21T23:59:59.000Z

199

Federal Acquisition Circular 2005-39 Item I--Extend Use of Simplified Acquisition Procedures for Certain Commercial Items (FAR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39 39 Item I--Extend Use of Simplified Acquisition Procedures for Certain Commercial Items (FAR Case 2009-035) This final rule amends the FAR to implement section 81 6 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 201 0. The rule extends for two more years the commercial items test program in FAR subpart 13.5. The program was to expire January 1, 2010. Item 11--Clarification of Submission of Cost or Pricing Data on Non-Commercial Modifications of Commercial Items (FAR Case 2008-0 12) This final rule adopts, with minor changes, the interim rule published in the Federal Register at 74 FR 1 1826 on March 19,2009. The interim rule amended the FAR to implement section 8 14 of the NDAA for FY 2008. Section 8 14 requires the harmonization of the threshold for cost

200

RM Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

in 1990. The projects serve Colorado, Kansas, Nebraska and Wyoming with 830 MW of installed capacity and 3,360 miles of transmission line. About Power Marketing...

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Semiconductors Programs and Projects  

Science Conference Proceedings (OSTI)

... The Power Devices and Thermal Metrology Project develops electrical and ... Back-End-of-Line Reliability Metrology Development Last Updated Date ...

2010-05-24T23:59:59.000Z

202

Native Grass Restoration Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Reader pdf format) on the Oak Ridge Reservation. Native Grass Restoration Projects Power Line Right-of-Way Roadside Re-Vegetation Riparian Restoration SNS Entrance Habitat...

203

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

204

Project title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Project title: Roseville Elverta (RSC-ELV) OPGW Replacement Project Requested By: David Young Mail Code : N1410 Phone: 916-353-4542 Date Submitted: 5/4/2011 Date Required: 5/7/2011 Description of the Project: Purpose and Need The Western Area Power Administration (Western), Sierra Nevada Region (SNR), is responsible for the operation and maintenance (O&M) of federally owned and operated transmission lines, Switchyards, and facilities throughout California. Western and Reclamation must comply with the National Electric Safety Code, Western States Coordinating Council (WECC), and internal directives for protecting human safety, the physical environment, and maintaining the reliable operation of the transmission system. There is an existing OPGW communications fiber on the transmission towers between Roseville and Elverta

205

Action items inspired by the IPCC exercise  

NLE Websites -- All DOE Office Websites (Extended Search)

PCMDI PCMDI ARM 13 March '08 K. E. Taylor Climate Radiative Responses and Clouds: What we are learning from CMIP3 Karl E. Taylor Program for Climate Model Diagnosis and Intercomparison with thanks to S. Bony, B. Soden, and others Presented at the ARM Science Team Meeting Norfolk, VA 13 March 2008 PCMDI ARM 13 March '08 K. E. Taylor CMIP3 terminology and background * CMIP = Coupled Model Intercomparison Project * Simulations performed in support of IPCC's Fourth Assessment Report (AR4) * WCRP's WGCM & CMIP panel coordinated activity * PCMDI archived and made available model output (funded by DOE) * 17 climate modeling centers (23 models) performed 12 expts. each * CMIP3 impact: Has resulted in more than 300 publications

206

Multi-item memory in the primate prefrontal cortex  

E-Print Network (OSTI)

The ability to retain multiple items in short-term memory is fundamental for cognition, yet almost nothing is known about its neural basis. To explore the mechanisms underlying this ability, we trained two monkeys to ...

Warden, Melissa R. (Melissa Rhoads)

2006-01-01T23:59:59.000Z

207

German noch so: scalar degree operator and negative polarity item  

Science Conference Proceedings (OSTI)

This paper describes a puzzle introduced by German noch so, a degree operator and Negative Polarity Item. Noch so sentences allow for paraphrases containing a scalar particle (like even), suggesting that its polarity sensitivity can receive an analysis ...

Bernhard Schwarz

2009-12-01T23:59:59.000Z

208

Plant Support Engineering: Counterfeit, Fraudulent, and Substandard Items  

Science Conference Proceedings (OSTI)

The contents of this report summarize valuable insights gleaned by the Electric Power Research Institute (EPRI) technical advisory group (TAG) that researched the techniques being used by U.S. government agencies, similar industries, and manufacturers to combat the growing problem of counterfeit and fraudulent items. The report clearly indicates that commercial nuclear licensees need to implement measures to prevent counterfeit items from being introduced into their inventory and facilities to address co...

2009-10-27T23:59:59.000Z

209

Renovation project for Restaurant No. 1  

E-Print Network (OSTI)

This document describes the proposed renovation project for the Restaurant in the main building. The total cost of the project will be about 4 000 000 Swiss francs shared between NOVAE and the Organization as explained under item 4. The Finance Committee is invited to approve this project and the proposed funding arrangements.

2005-01-01T23:59:59.000Z

210

Project information  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Information Amistad Project (Texas) Collbran Project (Colorado) Colorado River Storage Project Dolores Project (Colorado) Falcon Project (Texas) Provo River Project (Utah)...

211

Proposal For Internationally Standardized Cost Item Definitions For The Decommissioning Of Nuclear Installations  

E-Print Network (OSTI)

Various international decommissioning projects have shown that there are substantial variations in cost estimates for individual installations. Studies to understand the reasons for these differences have been somewhat hampered by the fact that different types of cost estimation methods are used, having different data requirements. Although some uncertainty is inevitable in any costing method, an understanding of the costing methods used in particular projects is useful to avoid key uncertainties. Difficulties of understanding can be encountered and invalid conclusions drawn in making cost comparisons without regard to the context in which the various cost estimates were made. The above-mentioned difficulties are partly due to the lack of a standardized or generally agreed-upon costing method that includes well-structured and defined cost items and an established estimation method. Such a structure and method would be useful not only for project cost comparisons but would also be a t...

Lucien Teunckens Belgoprocess; Kurt Pflugrad; Lucien Teunckens; Candace Chan-sands; Ted Lazo

2000-01-01T23:59:59.000Z

212

NEPA COMPLIANCE SURVEY Project Information Project Title:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New power Line for new generator at ten sleep New power Line for new generator at ten sleep Dat e: 12114/10 DOE Code: Contractor Code: Project Lead: Mike Preston Project Overview 1. Brief project description (include Extend 3 phase power line from (existing) pole 99 to the Ten Sleep location for a new generator. The anything that could impact the transformer bank at the WDF will be dismantled, the line extended overhead, across 5 new power poles, to environment) the Ten Sleep Battery and the bank will be reassembled there. The new guy anchor at pole 99 will be located outside Palustrine wetlands. The line will be 34.5/19.920 KV, approximately 1,200 feet in length. 2. Legal location Ground disturbance will be minimal and have very little potential to affect the environment. 3. Duration of the project

213

Mitigation Action Implementation Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany and Laramie Counties, Wyoming, and Weld County, Colorado  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mitigation Action Plan Mitigation Action Plan To Implement Mitigation Requirements for Cheyenne-Miracle Mile and Ault-Cheyenne Transmission Line Rebuild Project, Carbon, Albany, and Laramie Counties, Wyoming, and Weld County, Colorado September 2006 CH-MM and AU-CH Mitigation Action Plan Sept. 2006 1 Action Plan for Standard Project Practices and Mitigation Mitigation Action Identifier Resources for Which the Mitigation Will Be Implemented Responsible Party for Implementing Mitigation Action Party Responsible for Monitoring and Ensuring Compliance Land use, transportation Construction Contractor Western Maintenance The contractor will limit the movement of crews and equipment to the ROW, including access routes. The contractor will limit movement on the ROW to minimize damage to

214

BWRVIP-274: BWR Vessel and Internals Project, Evaluation of On-Line NobleChemTM Platinum Deposition on Grand Gulf Dry Tubes  

Science Conference Proceedings (OSTI)

Grand Gulf Nuclear Station (GGNS) removed nuclear instrumentation detector dry tubes from the reactor during their 2012 refueling outage due to cracks in the plunger tubes. The report describes the results from three tubes that were scraped on site in October 2012 to obtain samples of the platinum (Pt) deposition resulting from On-Line NobleChemTM (OLNC) applications done in 2010 and 2011.BackgroundOLNC along with hydrogen injection is used by ...

2013-05-09T23:59:59.000Z

215

Suspect/Counterfeit Items Information Guide for Subcontractors/Suppliers  

Science Conference Proceedings (OSTI)

Counterfeiting of industrial and commercial grade items is an international problem that places worker safety, program objectives, expensive equipment, and security at risk. In order to prevent the introduction of Suspect/Counterfeit Items (S/CI), this information sheet is being made available as a guide to assist in the implementation of S/CI awareness and controls, in conjunction with subcontractor's/supplier's quality assurance programs. When it comes to counterfeit goods, including industrial materials, items, and equipment, no market is immune. Some manufactures have been known to misrepresent their products and intentionally use inferior materials and processes to manufacture substandard items, whose properties can significantly cart from established standards and specifications. These substandard items termed by the Department of Energy (DOE) as S/CI, pose immediate and potential threats to the safety of DOE and contractor workers, the public, and the environment. Failure of certain systems and processes caused by an S/CI could also have national security implications at Los Alamos National Laboratory (LANL). Nuclear Safety Rules (federal Laws), DOE Orders, and other regulations set forth requirements for DOE contractors to implement effective controls to assure that items and services meet specified requirements. This includes techniques to implement and thereby minimizing the potential threat of entry of S/CI to LANL. As a qualified supplier of goods or services to the LANL, your company will be required to establish and maintain effective controls to prevent the introduction of S/CI to LANL. This will require that your company warrant that all items (including their subassemblies, components, and parts) sold to LANL are genuine (i.e. not counterfeit), new, and unused, and conform to the requirements of the LANL purchase orders/contracts unless otherwise approved in writing to the Los Alamos National Security (LANS) contract administrator/procurements specialist.

Tessmar, Nancy D. [Los Alamos National Laboratory; Salazar, Michael J. [Los Alamos National Laboratory

2012-09-18T23:59:59.000Z

216

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

217

Rubric for LInC Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Fermilab Leadership Institute Integrating Internet, Instruction and Curriculum Project List The Fermilab LInC "Publishable Quality" Rubric To get "percent total" add all items successfully executed. Subtract those not applicable from total possible, and divide that number into total successfully executed items. Engaged Learning Pedagogy (weighted 30%) Percent total for engaged learning = __________ A. The web pages for students/participants invite and motivate them to start on the project by offering a task or situation that piques their curiosity in the project (invitation to learn/hook) come up with questions, concerns, issues, hypotheses, or problem-solving suggestions that guide their investigation and overall participation in the project

218

DOE G 430.1-1 Chp 16, Example Cost Codes for Construction Projects  

Directives, Delegations, and Requirements

This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

1997-03-28T23:59:59.000Z

219

The 1992 Pacific Northwest Residential Energy Survey : Phase 1 : Book 3 : Item-by-item Crosstabulations.  

SciTech Connect

This book constitutes a portion of the primary documentation for the 1992 Pacific Northwest Residential Energy Survey, Phase I. The complete 33-volume set of primary documentation provides information needed by energy analysts and interpreters with respect to planning, execution, data collection, and data management of the PNWRES92-I process. Thirty of these volumes are devoted to different ``views`` of the data themselves, with each view having a special purpose or interest as its focus. Analyses and interpretations of these data will be the subjects of forthcoming publications. Conducted during the late summer and fall months of 1992, PNWRES92-I had the over-arching goal of satisfying basic requirements for a variety of information about the stock of residential units in Bonneville`s service region. Surveys with a similar goal were conducted in 1979 and 1983. This volume discerns the information by the particular Bonneville Area Office. ``Selected crosstabulations`` refers to a set of nine survey items of wide interest (Dwelling Type, Ownership Type, Year-of-Construction, Dwelling Size, Primary Space-Heating Fuel, Primary Water-Heating Fuel, Household Income for 1991, Utility Type, and Space-Heating Fuels: Systems and Equipment) that were crosstabulated among themselves.

United States. Bonneville Power Administration. End-Use Research Section; Applied Management & Planning Group (Firm)

1993-06-01T23:59:59.000Z

220

Acceptable Materials for Recycling at Colorado State University Mixed Paper -Acceptable Items  

E-Print Network (OSTI)

Acceptable Materials for Recycling at Colorado State University Mixed Paper - Acceptable Items - Acceptable Items Refrigerators Microwave ovens Electrical Equipment: computers, monitors, TV's, etc. Remember

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Help Line  

NLE Websites -- All DOE Office Websites (Extended Search)

Help Line Help Line Ombuds Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns and want advice or referral while preserving confidentiality and anonymity. Callers may remain anonymous and the Help Line does not have caller ID or other methods of identifying callers. The Help Line maintains the same level of confidentiality and neutrality as the other Ombuds services. The Ombuds Help Line is not for reporting emergencies or officially

222

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) 2013 Annual Planning Summary for the Southwestern Area Power Administration

223

Item Subject I. Preventing Abuse of Interagency Contracts.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(FAC) 2005-55 (FAC) 2005-55 List of Rules in FAC 2005-55 Item Subject I. Preventing Abuse of Interagency Contracts. II. Transition to the System for Award Management (SAM). III. Brand-Name Specifications. IV. Time-and-Materials and Labor-Hour Contracts for Commercial Items. V. Public Access to the Federal Awardee Performance and Integrity Information System. VI. Updated Financial Accounting Standards Board Accounting References. VII. Technical Amendments. Item I--Preventing Abuse of Interagency Contracts (FAR Case 2008-032) This rule adopts as final, with changes, an interim rule that implemented section 865, Preventing Abuse of Interagency Contracts, of the Duncan Hunter National Defense Authorization Act for Fiscal Year 2009 (Pub. L. 110-417). This final rule further amends FAR

224

3.1_Item_2_Macondo_Well_07_Jun_1900.pdf | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3.1Item2MacondoWell07Jun1900.pdf 3.1Item2MacondoWell07Jun1900.pdf 3.1Item2MacondoWell07Jun1900.pdf More Documents & Publications 1.1Item11RITT07Jun1900N...

225

Microsoft Word - BSA NC Items Rev11.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

NCItems, Rev. 11; (Jun-12) 1 of 21 NCItems, Rev. 11; (Jun-12) 1 of 21 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NONCOMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Table of Contents Article 1 DEFINITIONS ................................................................................................................... 3 Article 2 ORDER OF PRECEDENCE ............................................................................................. 3 Article 3 ACCEPTANCE OF AGREEMENT, SURVIVABILITY ................................................. 4

226

Seasonality in the Natural Gas Balancing Item: Historical Trends and  

Gasoline and Diesel Fuel Update (EIA)

Analysis > Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures Analysis > Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures Released: June 4, 2010 Download Full Report (PDF) This special report examines an underlying cause of the seasonal pattern in the balancing item published in the Natural Gas Monthly. Research finds that a significant portion of data collected on EIA’s primary monthly natural gas consumption survey reflects billing data that does not strictly coincide with the actual calendar month, which creates an aggregate-level discrepancy with EIA’s other natural gas supply and disposition data series. This discrepancy is especially observable during the fall and spring as one transitions into and out of the winter heating season. The report also outlines improved data collection and estimation procedures that will be implemented later this year to more closely align reported and actual calendar month consumption. This discussion will be helpful to users of EIA’s volumetric natural gas data. Questions about this report should be directed to Andy Hoegh at andrew.hoegh@eia.doe.gov or (202) 586-9502.

227

What's hot and what's not: tracking most frequent items dynamically  

Science Conference Proceedings (OSTI)

Most database management systems maintain statistics on the underlying relation. One of the important statistics is that of the "hot items" in the relation: those that appear many times (most frequently, or more than some threshold). For example, end-biased ...

Graham Cormode; S. Muthukrishnan

2003-06-01T23:59:59.000Z

228

What's hot and what's not: tracking most frequent items dynamically  

Science Conference Proceedings (OSTI)

Most database management systems maintain statistics on the underlying relation. One of the important statistics is that of the hot items in the relation: those that appear many times (most frequently, or more than some threshold). For ... Keywords: Data stream processing, approximate query answering.

Graham Cormode; S. Muthukrishnan

2005-03-01T23:59:59.000Z

229

Representing digital assets usingMPEG-21 Digital Item Declaration  

Science Conference Proceedings (OSTI)

Various XML-based approaches aimed at representing compound digital assets have emerged over the last several years. Approaches that are of specific relevance to the digital library community include the Metadata Encoding and Transmission Standard (METS), ... Keywords: Digital Item, Digital asset, MPEG-21 DID, OAI-PMH, OpenURL

Jeroen Bekaert; Emiel De Kooning; Herbert de Sompel

2006-04-01T23:59:59.000Z

230

MPEG-21 digital items in research and practice  

Science Conference Proceedings (OSTI)

The aim of the MPEG-21 standard, the so-called Multimedia Framework, is to enable transparent and augmented use of multimedia resources across a wide range of networks, devices, user preferences, and communities, notably for trading (of bits). As such, ... Keywords: DANAE, ENTHRONE, MPEG-21, P2P-Next, UPnP, application, digital item, digital library, usage

Christian Timmerer; Hermann Hellwagner

2010-04-01T23:59:59.000Z

231

Item-based top-N recommendation algorithms  

Science Conference Proceedings (OSTI)

The explosive growth of the world-wide-web and the emergence of e-commerce has led to the development of recommender systems---a personalized information filtering technology used to identify a set of items that will be of interest to a certain ... Keywords: e-commerce, predicting user behavior, world wide web

Mukund Deshpande; George Karypis

2004-01-01T23:59:59.000Z

232

Conceptual design report: Nuclear materials storage facility renovation. Part 1, Design concept. Part 2, Project management  

Science Conference Proceedings (OSTI)

The Nuclear Materials Storage Facility (NMSF) at the Los Alamos National Laboratory (LANL) was a Fiscal Year (FY) 1984 line-item project completed in 1987 that has never been operated because of major design and construction deficiencies. This renovation project, which will correct those deficiencies and allow operation of the facility, is proposed as an FY 97 line item. The mission of the project is to provide centralized intermediate and long-term storage of special nuclear materials (SNM) associated with defined LANL programmatic missions and to establish a centralized SNM shipping and receiving location for Technical Area (TA)-55 at LANL. Based on current projections, existing storage space for SNM at other locations at LANL will be loaded to capacity by approximately 2002. This will adversely affect LANUs ability to meet its mission requirements in the future. The affected missions include LANL`s weapons research, development, and testing (WRD&T) program; special materials recovery; stockpile survelliance/evaluation; advanced fuels and heat sources development and production; and safe, secure storage of existing nuclear materials inventories. The problem is further exacerbated by LANL`s inability to ship any materials offsite because of the lack of receiver sites for mate rial and regulatory issues. Correction of the current deficiencies and enhancement of the facility will provide centralized storage close to a nuclear materials processing facility. The project will enable long-term, cost-effective storage in a secure environment with reduced radiation exposure to workers, and eliminate potential exposures to the public. This document provides Part I - Design Concept which describes the selected solution, and Part II - Project Management which describes the management system organization, the elements that make up the system, and the control and reporting system.

NONE

1995-07-14T23:59:59.000Z

233

Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters  

E-Print Network (OSTI)

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Harlingen Irrigation District Cameron County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for each of the four components of the proposed project (i.e., canal meters and telemetry equipment, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for each of the four components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $31.37 per ac-ft and energy savings are measured at an aggregate value of $0.0002253 per BTU (i.e., $0.769 per kwh). In addition, expected values are indicated for the Bureau of Reclamations three principal evaluation measures specified in the Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $26.87 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0001603 per BTU ($0.547 per kwh). The amount of initial construction costs per dollar of total annual economic savings is estimated to be -1.30.

Rister, M. Edward; Lacewell, Ronald D.; Sturdivant, Allen W.; Robinson, John R.C.; Popp, Michael C.; Ellis, John R.

2002-10-01T23:59:59.000Z

234

Federal Acquisition Circular 2005-52 Item Subject FAR case  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Circular 2005-52 Circular 2005-52 Item Subject FAR case I Sustainable Acquisition 2010-001 II Contract Closeout 2008-020 III Prohibition on Contracting with Inverted Domestic Corporations 2008-009 IV Buy American Exemption for Commercial Information Technology - Construction Material 2009-039 V Oversight of Contractor Ethics Programs 2010-017 VI Technical Amendments N/A Item I--Sustainable Acquisition (FAR Case 2010-001) (Interim) This interim rule amends the FAR to implement Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, and Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management. It requires Federal agencies to leverage agency acquisitions to foster markets for

235

Ultra-wideband Location Authentication for Item Tracking  

SciTech Connect

International safeguards is increasingly utilizing unattended and remote monitoring methods to improve inspector efficiency and the timeliness of diversion detection. Item identification and tracking has been proposed as one unattended remote monitoring method, and a number of radio-frequency (RF) technologies have been proposed. When utilizing location information for verification purposes, strong assurance of the authenticity of the reported location is required, but most commercial RF systems are vulnerable to a variety of spoofing and relay attacks. ORNL has developed a distance bounding method that uses ultra-wideband technology to provide strong assurance of item location. This distance bounding approach can be coupled with strong symmetric key authentication methods to provide a fully authenticable tracking system that is resistant to both spoofing and relay attacks. This paper will discuss the overall problems associated with RF tracking including the common spoofing and relay attack scenarios, the ORNL distance bounding approach for authenticating location, and the potential applications for this technology.

Rowe, Nathan C [ORNL; Kuhn, Michael J [ORNL; Stinson, Brad J [ORNL; Holland, Stephen A [ORNL

2012-01-01T23:59:59.000Z

236

SUMMARY OF FINAL RULES Item Subject FAR Case  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CIRCULARS 2005-56 and -57 CIRCULARS 2005-56 and -57 SUMMARY OF FINAL RULES Item Subject FAR Case FAC 56-Miscellaneous I. Women-Owned Small Business Program 2010-015 II. Proper Use and Management of Cost-Reimbursement Contracts 2008-030 III. Requirements for Acquisitions Pursuant to Multiple-Award Contracts 2007-012 IV. Socioeconomic Program Parity 2011-004 V. Trade Agreements Thresholds 2012-002 VI. New Designated Country (Armenia) and Other Trade Agreements Updates 2011-30 VII. Government Property 2010-009 VIII. Technical Amendments FAC 57- Korea Free trade Agreement Item I-Women-Owned Small Business (WOSB) Program (FAR Case 2010-015) This rule adopts as final, with changes, an interim rule published in the Federal Register at 76 FR

237

Microsoft Word - BSA NC Items Rev10.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

10; (Aug. 2011) 1 of 17 10; (Aug. 2011) 1 of 17 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NON-COMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Definitions 2 Article 1 Order of Precedence 2 Article 2 Acceptance of Agreement 2 Article 3 Complete Agreement 3 Article 4 Assignment 3 Article 5 Compliance with Laws and Regulations 3 Article 6 Compliance with Internet Protocol Version 6 (IPv6) In Acquiring Information Article 7 Technology. 3 Independent Contractor; Hold Harmless 4 Article 8 Notice Regarding Late Delivery 4 Article 9 Inspection and Acceptance 4 Article 10 No Waiver 5 Article 11 New Materials 5 Article 12 Suspect/Counterfeit Items 5 Article 13 Hazardous Material Identification and Material Safety Data 6 Article 14 Title and Risk of Loss 6 Article 15

238

Navajo Electrification Demonstraiton Project  

SciTech Connect

This is a final technical report required by DOE for the Navajo Electrification Demonstration Program, This report covers the electric line extension project for Navajo families that currently without electric power.

Larry Ahasteen, Project Manager

2006-07-17T23:59:59.000Z

239

San Luis Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Luis Transmission Project EIS/EIR Luis Transmission Project EIS/EIR San Luis Transmission Project EIS/EIR Western proposes to construct, own, operate, and maintain a new 230-kilovolt transmission line about 62 miles in length between Western's Tracy Substation and Western's San Luis Substation and a new 70-kV transmission line about 5 miles in length between the San Luis and O'Neill Substations. Western also will consider other transmission construction options including: A new 500-kV transmission line about 62 miles in length operated at 230-kV between Western's Tracy and San Luis Substations; A new 500-kV transmission line operated at 500-kV about 62 miles in length between the Tracy Substation and Pacific Gas and Electric's Los Banos Substation; and A new 230-kV transmission line about 18 miles in length between San Luis Substation and Dos Amigos Substation.

240

ESTIMATING RISK TO CALIFORNIA ENERGY INFRASTRUCTURE FROM PROJECTED CLIMATE CHANGE  

E-Print Network (OSTI)

Effects of Wildfires on Transmission Line Reliability. Draft16. Projected fire risk to transmission lines for the A217. Projected fire risk to transmission lines for the B1

Sathaye, Jayant

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

OFFICE OF CIVIL RIGHTS NA-1.2 VIDEO LIBRARY Item Title  

National Nuclear Security Administration (NNSA)

OFFICE OF CIVIL RIGHTS NA-1.2 OFFICE OF CIVIL RIGHTS NA-1.2 VIDEO LIBRARY Item # Title # of copies DVD / CD Length Year Publisher 1 A Clear Picture - Harassment in the Public Sector- Una Imagen Clara Acosoen el Sector Publico 1 DVD 2008 Coastal Training Technologies Corp. A Dupont Company 2 Harassment Hurts: It's Personal 1 DVD 16 min 2009 ATS Media 3 Harassment Is .. (government version) 1 DVD 21 min 2005 Coastal Training Technologies Corp. A Dupont Company 4 Harassment Made Simple 1 DVD 6 min 2011 TrainingABC 5 Harassment Training for Supervisors: Let's Face It. Capacitaci ón contra el Hostigamiento para Supervisores Enfrent émoslo 1 DVD 58 min 2007 Coastal Training Technologies Corp. A Dupont Company 6 It's UP to You: Stopping Sexual Harassment for Managers 1 DVD 27 min 2005 ATS Media 7 OpenLines: Exploring Harassment

242

Monticello NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items  

Office of Legacy Management (LM)

NPL Sites NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items Location Monticello, Utah- DOE Office of Legacy Management field office Date September 27,2006 Attendees David Bird- Utah Department of Environmental Quality Paul Mushovic- U.S. Environmental Protection Agency Att Kleinrath- U.S. Depmtment of Energy Tim Bartlett- S. M. Stoller Meeting topics and discussion points are summarized separately under the headings that follow. Attaclunent 1 to this report includes the agenda and handout materials provided at the meeting. This report also includes disposal cell and Pond 4 leachate collection data (Attachment 2), quarterly site inspection results (Attachment 3), and project schedule and deliverables through the next two qumters (October 2006 through March 2007). With this

243

Application Filling Requirements for Transmission Line and Substation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

here Home Savings Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) Application Filling Requirements for Transmission...

244

Investigating Magnetic Field Lines Project Overview  

E-Print Network (OSTI)

. How did various sub-populations of students perform? Consider factors such as gender, race, socio of properties and changes of properties in matter. · Transfer of energy Content Standard E: Science-12, all students should develop an understanding of motions and forces. · Conservation of energy

Weston, Ken

245

Guideline for the Seismic Technical Evaluation of Replacement Items for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This guideline provides practical, cost-effective techniques for reasonably assuring that replacement items will meet seismic performance requirements. Meeting such requirements is necessary to maintain the seismic design basis of commercial nuclear power plants. The guideline also offers a method for determining when a seismic technical evaluation of replacement items is required as part of the procurement process for spare and replacement items.

1993-06-01T23:59:59.000Z

246

A PTAS for the chance-constrained knapsack problem with random item sizes  

Science Conference Proceedings (OSTI)

We consider a stochastic knapsack problem where each item has a known profit but a random size that is normally distributed independent of other items. The goal is to select a profit maximizing set of items such that the probability of the total size ... Keywords: Approximation schemes, Chance constraint, Stochastic knapsack

Vineet Goyal; R. Ravi

2010-05-01T23:59:59.000Z

247

Non-personnel OMB A-21 Exceptions Direct Charging to Federal Projects Direct charging costs to federal grants which are typically considered F&A may be  

E-Print Network (OSTI)

are met. These conditions include: 1. items are required by the projects scope of work 2. costs can be specifically and easily identified to this project 3. the number and/or cost of the items needed is clearly use on a project, charges may be allowable as direct costs if appropriately justified. Office supplies

Hall, Daniel

248

Geysers Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Geothermal Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Geysers Project Geothermal Project Project Location Information Coordinates 38.790555555556°, -122.75583333333° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.790555555556,"lon":-122.75583333333,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

249

Control of Suspect/Counterfeit and Defective Items  

Science Conference Proceedings (OSTI)

This procedure implements portions of the requirements of MSC-MP-599, Quality Assurance Program Description. It establishes the Mission Support Alliance (MSA) practices for minimizing the introduction of and identifying, documenting, dispositioning, reporting, controlling, and disposing of suspect/counterfeit and defective items (S/CIs). employees whose work scope relates to Safety Systems (i.e., Safety Class [SC] or Safety Significant [SS] items), non-safety systems and other applications (i.e., General Service [GS]) where engineering has determined that their use could result in a potential safety hazard. MSA implements an effective Quality Assurance (QA) Program providing a comprehensive network of controls and verification providing defense-in-depth by preventing the introduction of S/CIs through the design, procurement, construction, operation, maintenance, and modification of processes. This procedure focuses on those safety systems, and other systems, including critical load paths of lifting equipment, where the introduction of S/CIs would have the greatest potential for creating unsafe conditions.

Sheriff, Marnelle L.

2013-09-03T23:59:59.000Z

250

Windy Gap Firming Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Windy Gap Firming Project Windy Gap Firming Project Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Windy Gap Firming Project, Final Environmental Impact Statement, DOE/EIS-0370 (cooperating agency) Western's proposed action is to relocate approximately 3.8 miles of the existing Estes to Lyons 115-kilovolt transmission line, if the Chimney Hollow Reservoir alternative is constructed. The line would be moved outside the area proposed for the reservoir, and Western would ensure the new location would allow the agency to continue to operate and maintain it. Section 2.4.1.4 of the Final Environmental Impact Statement, Volume 1 provides more information on the transmission line relocation proposal. The U.S. Department of the Interior, Bureau of Reclamation is the Lead Agency for the National Environmental Policy Act Review. Cooperating agencies are Western, the U.S. Army Corps of Engineers and Grand County, Colo.

251

Apparatus and method for identification and recognition of an item with ultrasonic patterns from item subsurface micro-features  

DOE Patents (OSTI)

The present invention is a means and method for identification and recognition of an item by ultrasonic imaging of material microfeatures and/or macrofeatures within the bulk volume of a material. The invention is based upon ultrasonic interrogation and imaging of material microfeatures within the body of material by accepting only reflected ultrasonic energy from a preselected plane or volume within the material. An initial interrogation produces an identification reference. Subsequent new scans are statistically compared to the identification reference for making a match/non-match decision. 15 figs.

Perkins, R.W.; Fuller, J.L.; Doctor, S.R.; Good, M.S.; Heasler, P.G.; Skorpik, J.R.; Hansen, N.H.

1995-09-26T23:59:59.000Z

252

Method of locating related items in a geometric space for data mining  

DOE Patents (OSTI)

A method for locating related items in a geometric space transforms relationships among items to geometric locations. The method locates items in the geometric space so that the distance between items corresponds to the degree of relatedness. The method facilitates communication of the structure of the relationships among the items. The method is especially beneficial for communicating databases with many items, and with non-regular relationship patterns. Examples of such databases include databases containing items such as scientific papers or patents, related by citations or keywords. A computer system adapted for practice of the present invention can include a processor, a storage subsystem, a display device, and computer software to direct the location and display of the entities. The method comprises assigning numeric values as a measure of similarity between each pairing of items. A matrix is constructed, based on the numeric values. The eigenvectors and eigenvalues of the matrix are determined. Each item is located in the geometric space at coordinates determined from the eigenvectors and eigenvalues. Proper construction of the matrix and proper determination of coordinates from eigenvectors can ensure that distance between items in the geometric space is representative of the numeric value measure of the items' similarity. 12 figs.

Hendrickson, B.A.

1999-07-27T23:59:59.000Z

253

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

254

Project of the Month  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

project-of-the-month Office of Environmental project-of-the-month Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 202-586-7709 en One-of-a-Kind Facility Now in Safe Shutdown http://energy.gov/em/articles/one-kind-facility-now-safe-shutdown One-of-a-Kind Facility Now in Safe Shutdown

255

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Chart: project timeline - Project Milestones - Budget - Bibliography * Thank you 29 30 Organization Chart * Project team: Purdue University - Dr. Brenda B. Bowen: PI, student...

256

Project 258  

NLE Websites -- All DOE Office Websites (Extended Search)

MONITORING POWER PLANT EFFICIENCY USING MONITORING POWER PLANT EFFICIENCY USING THE MICROWAVE-EXCITED PHOTOACOUSTIC EFFECT TO MEASURE UNBURNED CARBON Objective The objective of this project is to explore the use of the microwave-excited photoacoustic (MEPA) effect for quantitative analysis of unburned carbon in fly ash, an extremely important parameter to the electric utility industry. Specific objectives include: * Determine factors that influence accuracy and precision of the MEPA effect; * Evaluate the microwave spectra of fly ash and other divided solids of importance to the power industry; and * Determine the feasibility of an on-line carbon-in-ash monitor based on the MEPA effect. Benefits High carbon levels in coal ash indicate poor combustion efficiency, resulting in additional fuel requirements and higher emissions of pollutants, such as acid-rain

257

Project 261  

NLE Websites -- All DOE Office Websites (Extended Search)

NOVEL CORROSION SENSOR FOR ADVANCED NOVEL CORROSION SENSOR FOR ADVANCED FOSSIL ENERGY POWER SYSTEMS Description The overall objective of this proposed project is to develop a new technology for on-line corrosion monitoring based on an innovative concept. The specific objectives and corresponding tasks are (1) develop the sensor and electronic measurement system; (2) evaluate and improve the system in a laboratory muffle furnace; and (3) evaluate and improve the system through tests conducted in a pilot-scale coal combustor (~1 MW). Fireside corrosion refers to the metal loss caused by chemical reactions on surfaces exposed to the combustion environment. Such corrosion is the leading mechanism for boiler tube failures and is a serious concern for current and future energy plants due to the introduction of technologies targeting emissions

258

BEAM LINE  

NLE Websites -- All DOE Office Websites (Extended Search)

BEAM LINE BEAM LINE 45 W ILHELM ROENTGEN'S INITIAL DISCOVERY of X-radiation in 1895 led immediately to practical applications in medicine. Over the next few decades X rays proved to be an invaluable tool for the investigation of the micro-world of the atom and the development of the quantum theory of matter. Almost a century later, telescopes designed to detect X-radiation are indispensable for understanding the structure and evolution of the macro-world of stars, galaxies, and the Universe as a whole. The X-Ray Universe by WALLACE H. TUCKER X-ray images of the Universe are strikingly different from the usual visible-light images. 46 SUMMER 1995 did not think: I investigated." Undeterred by NASA's rejection of a proposal to search for cosmic X-radiation, Giacconi persuaded the

259

Kentucky Transmission Line Siting Methodology  

Science Conference Proceedings (OSTI)

EPRI, in conjunction with Georgia Transmission Corporation (GTC) and Photo Science, Inc. (PSI), developed a standardized methodology for siting overhead electric transmission lines. EPRI report 1013080, EPRI-GTC Overhead Electric Transmission Line Siting Methodology, published February 2006, provides additional information. This methodology has been applied in Georgia and currently is being applied to projects in Kentucky by East Kentucky Power Cooperative and E.ON U.S. on behalf of Louisville Gas and El...

2007-12-18T23:59:59.000Z

260

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

1992-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Special Study of The Department of Energy's Management of Suspect/Counterfeit Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SPECIAL STUDY SPECIAL STUDY Independent Oversight Special Study of The Department of Energy's Management of Suspect/Counterfeit Items August 2003 OVERSIGHT Table of Contents EXECUTIVE SUMMARY ............................................................... 1 1.0 INTRODUCTION ...................................................................... 3 2.0 DOE HEADQUARTERS SUSPECT/COUNTERFEIT ITEM PROCESSES .................................................................... 6 3.0 IMPLEMENTATION OF SUSPECT/COUNTERFEIT ITEM REQUIREMENTS AT DOE SITES ................................. 13 4.0 CONCLUSIONS AND RECOMMENDATIONS ....................... 24 APPENDIX A - Supplemental Information ....................................... 30 Abbreviations Used in This Report CY Calendar Year DCIS Defense Criminal Investigative Service

262

INVESTIGATION OF MIS ITEM 011589A AND 3013 CONTAINERS HAVING SIMILAR CHARACTERISTICS  

DOE Green Energy (OSTI)

Recent testing has identified the presence of hydrogen and oxygen in MIS Item 011589A. This isolated observation has effectuated concern regarding the potential for flammable gas mixtures in containers in the storage inventory. This study examines the known physicochemical characteristics of MIS Item 011589A and queries the ISP Database for items that are most similar or potentially similar. Items identified as most similar are believed to have the highest probability of being chemically and structurally identical to MIS Item 011589A. Items identified as potentially like MIS Item 011589A have some attributes in common, have the potential to generate gases, but have a lower probability of having similar gas generating characteristics. MIS Item 011589A is an oxide that was generated prior to 1990 at Rocky Flats in Building 707. It was associated with foundry processing and had an actinide assay of approximately 77%. Prompt gamma analysis of MIS Item 011589A indicated the presence of chloride, fluorine, magnesium, sodium, and aluminum. Queries based on MIS representation classification and process of origin were applied to the ISP Database. Evaluation criteria included binning classification (i.e., innocuous, pressure, or pressure and corrosion), availability of prompt gamma analyses, presence of chlorine and magnesium, percentage of chlorine by weight, peak ratios (i.e., Na:Cl and Mg:Na), moisture, and percent assay. These queries identified 15 items that were most similar and 106 items that were potentially like MIS Item 011589A. Although these queries identified containers that could potentially generate flammable gases, verification and confirmation can only be accomplished by destructive evaluation and testing of containers from the storage inventory.

Friday, G

2006-08-23T23:59:59.000Z

263

DSW Power Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Power Projects Contact DSW Customers Customer Meetings Environmental Review-NEPA Operations & Maintenance Planning & Projects Power Marketing Rates DSW Power Projects Boulder Canyon: Straddling the Colorado River near the Arizona-Nevada border, Hoover Dam in Boulder Canyon creates Lake Mead. River waters turning turbines at Hoover Powerplant produce about 2,074 MW--enough electricity for nearly 8 million people. Western markets this power to public utilities in Arizona, California and Nevada over 53.30 circuit-miles of transmission line. Central Arizona: Authorized in 1968, the Central Arizona Project in Arizona and western New Mexico was built to improve water resources in the Colorado River Basin. Segments of the authorization allowed for Federal participation in the Navajo Generating Station. The Federal share of the powerplant's combined capacity is 547 MW.

264

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland

265

Wind Project Development | Open Energy Information  

Open Energy Info (EERE)

Project Development Project Development Jump to: navigation, search This page provides links to information resources regarding project development steps. Photo from Iberdrola Renewables Inc., NREL 16702 To finance and construct a wind energy project, five areas must be addressed: Detailed wind resource data for the site being developed The right to access and use the land on which the project will be constructed Permission to construct and operate the project from local permitting authorities Rights to interconnect to the transmission or distribution system and to transport (wheel) that energy to its purchaser A power purchase agreement between the project owner (seller) and the power purchaser (buyer). If any of these items are not contractually supported with the proper documentation, the project is unlikely to obtain financing.[1]

266

Optimization Online - The multi-item capacitated lot-sizing problem ...  

E-Print Network (OSTI)

Sep 21, 2005 ... Abstract: We address a multi-item capacitated lot-sizing problem with setup times and shortage costs that arises in real-world production...

267

Seasonality in the Natural Gas Balancing Item: Historical Trends and Corrective Measures  

Reports and Publications (EIA)

This special report examines an underlying cause of the seasonal pattern in the balancing item published in the Natural Gas Monthly.

Andy Hoegh

2010-06-04T23:59:59.000Z

268

KCP installs steel cable mesh that can stop a 20 pound item traveling...  

NLE Websites -- All DOE Office Websites (Extended Search)

item traveling 240 mph Posted By Office of Public Affairs Construction of the Kansas City Plant at the new National Security Campus has included some unique building...

269

Microsoft Word - BSA_Commercial_Items_Rev13_Apr_2013.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

3; (Apr-13) 1 of 12 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR COMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Table of Contents Article 1 DEFINITIONS...

270

Appendix B Pre-Selected Query Items - U.S. Energy ...  

U.S. Energy Information Administration (EIA)

Appendix B Pre-Selected Query Items Description Memo Units Answers to Question in Part II about Alternative Fuel Vehicles This Query has the answers from

271

Conceptual design report, 219-S secondary containment upgrade, Project W-178  

Science Conference Proceedings (OSTI)

The 219-S Facility is located in the 200-West Area on the Hanford Site and was constructed in 1951. The facility receives and treats liquid, low-level mixed waste from the 222-S Laboratory prior to transfer of that waste to the SY Tank Farm. The 219-S Facility consists of Cell A containing Tanks 101 and 102 and Cell B containing Tank 103 and a spare space. Project W-178 will modify the 219-S Facility to bring it into compliance with the tank system standards in WAC 173-303-640. The secondary containment upgrade will consist of a stainless steel cell liner in both Cell A and the spare space in Cell B. Additionally, Cell B will be modified by taking Tank 103 out of service and installing a new tank: Tank 104. The construction work will be accomplished in phases to minimize service interruption to the 222-S Laboratory. The proposed design and construction method is the most cost effective of four alternatives evaluated during a value engineering session. Project W-178 is a fiscal year 1995 Line Item. Total estimated construction costs of the project are $2,600,000; other project costs are $710,000. The total project cost is $3,300,000.

Beyer, J.J. [Kaiser Engineers Hanford Co., Richland, WA (United States)

1993-05-01T23:59:59.000Z

272

NAVAJO ELECTRIFICATION DEMONSTRATION PROJECT  

SciTech Connect

The Navajo Electrification Demonstration Project (NEDP) is a multi-year project which addresses the electricity needs of the unserved and underserved Navajo Nation, the largest American Indian tribe in the United States. The program serves to cumulatively provide off-grid electricty for families living away from the electricty infrastructure, line extensions for unserved families living nearby (less than 1/2 mile away from) the electricity, and, under the current project called NEDP-4, the construction of a substation to increase the capacity and improve the quality of service into the central core region of the Navajo Nation.

Terry W. Battiest

2008-06-11T23:59:59.000Z

273

Research Projects at the CECM: Document Vault  

E-Print Network (OSTI)

Document Vault. The Vault Interface. The Document Vault project is intended to provide the basis for the flexible creation and use of on-line, multi-media...

274

TransWest Express Transmission Project  

NLE Websites -- All DOE Office Websites (Extended Search)

a whollyowned subsidiary of the Anschutz Corporation. The Project consists of an overhead transmission line extending approximately 725 miles from south-central Wyoming crossing...

275

MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT  

Office of Legacy Management (LM)

November/December 2004 November/December 2004 Report Period: November 1- December 31, 2004 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS The Program Directive for the wildlife survey is on schedule for completion by January 15. Comments from the Biological Technical Assistance group have been incorporated. MRAP A punchlist of mill site restoration items was prepared. DOE and the City of Monticello have agreed upon which entity will perform each item on the punchlist. MVP No significant activities to report. FF A Monthly Report November- December 2004 Page 2 of5 STATUS MONTICELLO PROJECTS FEDERAL FACILITIES AGREEMENT REPORT November/December 2004 Report Period: November 1- December 31, 2004 DOE Project Coordinator: Art Kleinrath Operable Units I and II DOE and the City of Monticello (City) are exploring the possibility of transferring the former

276

Project Accounts  

NLE Websites -- All DOE Office Websites (Extended Search)

» Project Accounts » Project Accounts Project Accounts Overview Project accounts are designed to facilitate collaborative computing by allowing multiple users to use the same account. All actions performed by the project account are traceable back to the individual who used the project account to perform those actions via gsisshd accounting logs. Requesting a Project Account PI's, PI proxies and project managers are allowed to request a project account. In NIM do "Actions->Request a Project Account" and fill in the form. Select the repository that the Project Account is to use from the drop-down menu, "Sponsoring Repository". Enter the name you want for the account (8 characters maximum) and a description of what you will use the account for and then click on the "Request Project Account" button. You

277

Wind Integration Forum June 6, 2011 Action Items Update December, 2011  

E-Print Network (OSTI)

Wind Integration Forum June 6, 2011 Action Items Update December, 2011 The action items from the June 6 Wind Integration Steering Committee are repeated below, followed by brief summaries of progress concern over possible impacts on grid stability from the growing wind fleet. BPA will report back

278

Modeling and optimization for the joint replenishment and delivery problem with heterogeneous items  

Science Conference Proceedings (OSTI)

In the real world, some heterogeneous items are prohibited from being transported together or penalty cost occurs when transporting them together. This paper firstly proposes the joint replenishment and delivery (JRD) model where a warehouse procures ... Keywords: Adaptive hybrid differential evolution, Delivery, Genetic algorithm, Heterogeneous items, Joint replenishment

Hui Qu, Lin Wang, Yu-Rong Zeng

2013-12-01T23:59:59.000Z

279

Project Title: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Code: DOE Code: Project Lead: NEPA COMPLIANCE SURVEY # 258 Project lnfonnation Rewire electrical to pole at 77SHX10 Mike Preston Date: 11-19-09 Contractor Code: Project Overview No~ rea has been previously disturbed. The trenching will be th,ugh pre-existing right of way for the 1. What are the environmental ~ ~=~d ~ impacts? 2. What is the legal location? Repair a~ replacement of electrical lines to the Pole next to well at 77S~1 0. This will require trenching 3. What is the duration of the project? across the road a~ to the pole. Removing old lines and replacement of lines. 4. What major equipment will be used if any (wor1< over rig, drilling rig, 1 day etc.)? Back hole The table below is to be completed by the Project Lead and reviewed by the Environmental Specialist and the DOE NEPA

280

Salt River Project Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Salt River Project Smart Grid Project Salt River Project Smart Grid Project Jump to: navigation, search Project Lead Salt River Project Country United States Headquarters Location Tempe, Arizona Recovery Act Funding $56,859,359.00 Total Project Value $114,003,719.00 Coverage Area Coverage Map: Salt River Project Smart Grid Project Coordinates 33.414768°, -111.9093095° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Project 244  

NLE Websites -- All DOE Office Websites (Extended Search)

PROJECT PARTNER Advanced Technology Systems, Inc. Pittsburgh, PA PROJECT PARTNERS Ohio University Athens, OH Texas A&M University-Kingsville Kingsville, TX WEBSITES http:...

282

Projects | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

and Conferences Supporting Organizations Supercomputing and Computation Home | Science & Discovery | Supercomputing and Computation | Projects Projects 1-10 of 180 Results Prev...

283

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit...

284

California Energy Commission Public Interest Energy Research/Energy System Integration -- Transmission-Planning Research & Development Scoping Project  

E-Print Network (OSTI)

Project Presented at Transmission Line Siting Models.last major interregional transmission line to California wasowner. It has built transmission lines across California to

Eto, Joseph H.; Lesieutre, Bernard; Widergren, Steven

2004-01-01T23:59:59.000Z

285

FRN Request for Proposals for New or Upgraded Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 AGENCY:...

286

Application Filling Requirements for Transmission Line and Substation...  

Open Energy Info (EERE)

icon Twitter icon Application Filling Requirements for Transmission Line and Substation Construction Projects (Wisconsin) This is the approved revision of this page, as...

287

results and benefits... The Bittern Line Carbon  

E-Print Network (OSTI)

results and benefits... The Bittern Line Carbon Neutral Stations Transport Regeneration Ltd. June 2008 c a s e s t u d yCRed carbon reduction Project Summary Our client, Transport Regeneration Ltd., aims to make nine stations on the Bittern Line between Norwich and Sheringham carbon neutral

Everest, Graham R

288

Requirements Uncertainty in a Software Product Line  

Science Conference Proceedings (OSTI)

A complex system's requirements almost always remain uncertain late into its software development. In gas turbine engine control systems at Rolls-Royce, for a traditional project (non-product line) typically 50% of requirements will change between Critical ... Keywords: Requirements, Uncertainty, Software Product Lines

Andy J. Nolan; Silvia Abrahao; Paul C. Clements; Andy Pickard

2011-08-01T23:59:59.000Z

289

Overhead Line Worker Practices Survey: 2012  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) has undertaken a multiyear research project to identify and describe leading industry overhead line worker practices. This effort is intended to identify and document industry overhead distribution line work practices of note, identify shortterm products (such as practices guidelines) that EPRI can ...

2012-08-23T23:59:59.000Z

290

Project Title: VIscosity Reduction Date:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4t 3 4t 3 l I Project lnfonnatlon Project Title: VIscosity Reduction Date: 11-22-2010 DOE Code: 673()-()20-51141 Contractor Code: 8067-778 Project Lead: Frank Ingham Project Overview 1. The purpose of the project is to test a tool that temporarily reduces the viscosity of oil which allows it to be 1. Brief project description ~nclude pumped through pipelines easier. The test will require about 4 miles of line to pump the oil through after anything that could impact the treatment (hence the need to connect the 31oops together), a holding volume for recovery, then repeat. environmenJ] There will be tanks to hold the original volume, tanks to receive the volume after treatment and pumping 2. Legal location through the line, possible transfer between tanks, transport (trucking) of the oil to the site (by the COC) and

291

Canby Cascaded Project Geothermal Project | Open Energy Information  

Open Energy Info (EERE)

Canby Cascaded Project Geothermal Project Canby Cascaded Project Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Canby Cascaded Project Geothermal Project Project Location Information Coordinates 41.443888888889°, -120.87027777778° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.443888888889,"lon":-120.87027777778,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

292

Future Inspection of Overhead Transmission Lines  

Science Conference Proceedings (OSTI)

This report documents scenarios and technologies that can be applied in the future for the inspection of transmission lines. Scenarios describe the utilization of a range of concepts, including distributed sensors, unmanned airborne vehicles, RF communication, and robotics. An approach to performing demonstration projects using currently available technologies is provided and will be implemented in the following phases of the project.

2008-06-23T23:59:59.000Z

293

Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Deputy Secretary Poneman to Clean Line Energy Regarding Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) More Documents & Publications Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of

294

A MULTIPLE-ITEM MULTIPLE-CONSTRAINT INVENTORY OPTIMIZATION AND SUPPLIER SELECTION MODEL UNDER LEAD TIME DEMAND UNCERTAINTY.  

E-Print Network (OSTI)

??The objective of this thesis is to solve a multiple-item, one-retailer inventory control and supplier selection problem with multiple constraints and uncertainties. For each item, (more)

Zhu, Rongjia

2009-01-01T23:59:59.000Z

295

Plant Support Engineering: Guidance for Managing the Impact of Procured Item Quality Issues on Generating Asset Economic Performance  

Science Conference Proceedings (OSTI)

In 2007, EPRI Plant Support Engineering (PSE) published Technical Update 1015171, Procured Item Quality Initiative, Initial Findings, as the initial output from the Technical Advisory Group (TAG) for the EPRI Procured Item Quality Initiative. The update categorized data about procured item quality issues provided by TAG members, summarized the analysis performed, and provided initial conclusions. In addition, the update identified types of items for which quality concerns exist and summarized potential c...

2008-07-08T23:59:59.000Z

296

Thanksgiving Goodwill: West Valley Demonstration Project Food Drive  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Provides 640 Turkeys to People in Need Thanksgiving Goodwill: West Valley Demonstration Project Food Drive Provides 640 Turkeys to People in Need November 26, 2013 - 12:00pm Addthis Volunteers from West Valley Demonstration Project gather before distributing items collected in an annual food drive. Volunteers from West Valley Demonstration Project gather before distributing items collected in an annual food drive. Volunteer John Schelble helps unload a delivery truck at a food pantry. Volunteer John Schelble helps unload a delivery truck at a food pantry. John Rizzo passes canned food to John Rendall to deliver to a food pantry. John Rizzo passes canned food to John Rendall to deliver to a food pantry.

297

DOCKET: A-98-49 Item: II-B1-24  

E-Print Network (OSTI)

DOCKET: A-98-49 Item: II-B1-24 EDOCKET NO: EPA-HQ-OAR-2009-0330 TECHNICAL SUPPORT DOCUMENT ........................................................................15 3.3.3 Organic Ligands

298

DOCKET: A-98-49 Item: II-B2-23  

E-Print Network (OSTI)

DOCKET: A-98-49 Item: II-B2-23 EDOCKET NO: EPA-HQ-OAR-2009-0330 TECHNICAL SUPPORT DOCUMENT ......................................................................... 7-2 7.1.2 Organic Ligands

299

MIP-based heuristics for multi-item capacitated lot-sizing problem ...  

E-Print Network (OSTI)

is attached to each item as well as a variable unit production cost and a ... the safety stock deficits as well as the setup, the inventory and the production costs.

300

NERSC Users Group Meetings June 5-7, 2000 Notes and Action Items  

NLE Websites -- All DOE Office Websites (Extended Search)

Items Report on the NUGEX business meeting of June 6, 2000, in Oak Ridge Minute notes by Bas Braams First of all, many thanks to the organizers of the preceding NUG meeting:...

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Science Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne Argonne Science Project Ideas! Our Science Project section provides you with sample classroom projects and experiments, online aids for learning about science, as well as ideas for Science Fair Projects. Please select any project below to continue. Also, if you have an idea for a great project or experiment that we could share, please click our Ideas page. We would love to hear from you! Science Fair Ideas Science Fair Ideas! The best ideas for science projects are learning about and investigating something in science that interests you. NEWTON has a list of Science Fair linkd that can help you find the right topic. Toothpick Bridge Web Sites Toothpick Bridge Sites! Building a toothpick bridge is a great class project for physics and engineering students. Here are some sites that we recommend to get you started!

302

Plant Engineering: Guidelines for Establishing, Maintaining, and Extending the Shelf Life Capability of Limited Life Items  

Science Conference Proceedings (OSTI)

In accordance with 10CFR50 Appendix B, 10CFR71, and 10CFR72, nuclear utilities have a commitment to establish and maintain material control programs to assure the safety and reliability of generation facilities. Economic considerations demand that shelf life for a limited life item be maximized without affecting plant safety. Once shelf life is established, a utility may need to evaluate the usefulness of an item with an expired shelf life. In addition, technical incongruities may shorten the remaining s...

2011-11-03T23:59:59.000Z

303

Pecan Street Project, Inc. Smart Grid Demonstration Project | Open Energy  

Open Energy Info (EERE)

Project, Inc. Smart Grid Demonstration Project Project, Inc. Smart Grid Demonstration Project Jump to: navigation, search Project Lead Pecan Street Project, Inc. Country United States Headquarters Location Austin, Texas Recovery Act Funding $10,403,570.00 Total Project Value $24,656,485.00 Coordinates 30.267153°, -97.7430608° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

304

Vineyard Energy Project Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

Smart Grid Project Smart Grid Project Jump to: navigation, search Project Lead Vineyard Energy Project Country United States Headquarters Location West Tisbury, Massachusetts Recovery Act Funding $787,250.00 Total Project Value $1,574,500.00 Coverage Area Coverage Map: Vineyard Energy Project Smart Grid Project Coordinates 41.3812245°, -70.6744723° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

305

Analysis of the tradeoff between irrigated agriculure and hydroelectric power in the Pacific Northwest. [Base-line estimate of the effects of agricultural irrigation on the hydroelectric power generating potential projected for the year 2020  

DOE Green Energy (OSTI)

Hydrogeneration and irrigated agriculture are major competing users of the waters of the Columbia River and its tributaries. Irrigated agriculture requires the diversion of large amounts of water from the rivers, only part of which returns. As a result, streamflow is reduced and the generation potential of dams located downstream from points of irrigation diversion is reduced. In addition, irrigated agriculture involves the direct consumption of electricity to pump irrigation water and to apply it to crops in the field. The purpose of this report is to make a baseline estimate of the impact on the electrical generation system in the region of the level of irrigation development projected for year 2020 by the states of Oregon, Washington, and Idaho. This baseline estimate reflects the assumption that current conditions will prevail in the future. The results, therefore, provide a standard against which the impacts of changes in current conditions can be measured. It is estimated that the projected development level of 11.4 million acres of irrigated agriculture in Oregon, Washington, and Idaho by year 2020 would result in foregone hydroelectric generation potential of approximately 17.8 million megawatt-hours (MWh) annually and direct consumption of electric power for pumping and application of approximately 10.3 million MWh's annually. Thus, a total of 28.1 million MWh's of electric power generation will have to be traded off each year if irrigated agriculture is to be conducted on the projected scale. (ERB)

Davis, A. E.

1979-01-01T23:59:59.000Z

306

A Fisher-Rao Metric for Paracatadioptric Images of Lines  

Science Conference Proceedings (OSTI)

In a central paracatadioptric imaging system a perspective camera takes an image of a scene reflected in a paraboloidal mirror. A 360 field of view is obtained, but the image is severely distorted. In particular, straight lines in the scene project ... Keywords: Central projection, Fisher-Rao metric, Hough transform, Line detection, Paraboloidal mirror, Paracatadioptric system, Sobel operator, Trace transform

Stephen J. Maybank; Siohoi Ieng; Ryad Benosman

2012-09-01T23:59:59.000Z

307

Product derivation for solution-driven product line engineering  

Science Conference Proceedings (OSTI)

Solution-driven product line engineering is a project business where products are created for each customer individually. Although reuse of results from former projects is widely done, configuration and integration of the results currently is often a ... Keywords: feature modeling, software product line development, solution-driven software development

Christoph Elsner; Daniel Lohmann; Wolfgang Schrder-Preikschat

2009-10-01T23:59:59.000Z

308

SunZia Southwest Transmission Project Comments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SunZia Southwest Transmission Project SunZia Southwest Transmission Project Comments Provided to the US Department of Energy Office of Electricity Delivery and Energy Reliability Request for Information Relating to the Permitting of Transmission Lines Submitted as of March 28, 2012 2 1.0 Background. SunZia Southwest Transmission Project (SunZia or the Project) is a joint development effort currently underway in Arizona and New Mexico. The Project definition includes licensing, permitting, financing, constructing and operating up to two 500 kilovolt alternating current (AC) transmission lines and up to five interconnecting substations.

309

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

310

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Status Update: EPAct 2005 Title IX, Subtitle J Section 999 - Project NT42677, "Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Program Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 UDAC Update Presentation Outline * Consortium Accomplishments * UDW Program RFP Summary - 2007 - 2008 * 2009 Funding Disbursement History * 2009 Program / Process Enhancements - Contractual / GAO - Risk Mitigation / Management 3 Overall: * 3 Annual Plans completed * 15 solicitations released under 2007 R&D funding * 43 projects selected for award under 2007 solicitations - 17 Ultra-Deepwater projects - 19 Unconventional Resources projects - 7 Small Producers projects Program Accomplishments Solicitations & Awards 4 * Current Status:

311

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS August 20-22, 2013 2 Presentation Outline * Benefits to the program * Project overall objectives * Technical status * Project summary * Conclusions and future plans 3 Benefit to the Program * Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * This research project develops a reservoir scale CO 2 plume migration model at the Sleipner project, Norway. The Sleipner project in the Norwegian North Sea is the world's first commercial scale geological carbon storage project. 4D seismic data have delineated the CO 2 plume migration history. The relatively long history and high fidelity data make

312

Amendment of Presidential Permit (PP-68) San Diego Gas & Electric Company for Interconnection of Otay Mesa Generating Project to Miguel-Tijuana 230 kV Transmission Line San Diego, California  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section Page S:\COMM\NEPA\TODO \EA1383\EATOC1 -R.DOC 4/1/02 -i- 1.0 INTRODUCTION 1-1 1.1 BACKGROUND 1-1 1.2 SCOPE OF PROJECT 1-2 1.3 PURPOSE AND NEED 1-3 1.4 AGENCY ACTIONS 1-3 1.4.1 Federal 1-3 1.4.1.1 U.S. Department of Energy 1-3 1.4.1.2 U.S. Fish and Wildlife Service 1-4 1.4.2 Other Agenc y Actions 1-4 1.4.2.1 California Energy Commission 1-4 1.4.2.2 California Department of Fish and Game 1-4 1.4.2.3 State Historic Preservation Office 1-5 1.4.2.4 San Diego County 1-5 2.0 PROPOSED ACTION AND ALTERNATIVES 2-1 2.1 NO ACTION ALTERNATIVE 2-1 2.2 PROPOSED ACTION 2-1 2.2.1 Proposed Amendment to Presidential Permit (PP-68) 2-2 2.2.2 Description of Proposed Project Components and Activities 2-3 2.2.2.1 Otay Mesa 230 kV Switchyard 2-3

313

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

1-23, 2012 1-23, 2012 2 Presentation Outline I. Benefits II. Project Overview III. Technical Status A. Background B. Results IV. Accomplishments V. Summary 3 Benefit to the Program * Program goals. - Prediction of CO 2 storage capacity. * Project benefits. - Workforce/Student Training: Support of 3 student GAs in use of multiphase flow and geochemical models simulating CO 2 injection. - Support of Missouri DGLS Sequestration Program. 4 Project Overview: Goals and Objectives Project Goals and Objectives. 1. Training graduate students in use of multi-phase flow models related to CO 2 sequestration. 2. Training graduate students in use of geochemical models to assess interaction of CO

314

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Center for Coal's Center for Coal's FY10 Carbon Sequestration Peer Review February 8 - 12, 2010 2 Collaborators * Tissa Illangasekare (Colorado School of Mines) * Michael Plampin (Colorado School of Mines) * Jeri Sullivan (LANL) * Shaoping Chu (LANL) * Jacob Bauman (LANL) * Mark Porter (LANL) 3 Presentation Outline * Benefit to the program * Project overview * Project technical status * Accomplishments to date * Future Plans * Appendix 4 Benefit to the program * Program goals being addressed (2011 TPP): - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefit: - This project is developing system modeling capabilities that can be used to address challenges associated with infrastructure development, integration, permanence &

315

Project 364  

NLE Websites -- All DOE Office Websites (Extended Search)

765-494-5623 lucht@purdue.edu DEVELOPMENT OF NEW OPTICAL SENSORS FOR MEASUREMENT OF MERCURY CONCENTRATIONS, SPECIATION, AND CHEMISTRY Project Description The feasibility of...

316

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State...

317

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Test and Evaluation of Test and Evaluation of Engineered Biomineralization Technology for Sealing Existing wells Project Number: FE0009599 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background information - Project Concept (MICP) - Ureolytic Biomineralization, Biomineralization Sealing * Accomplishments to Date - Site Characterization - Site Preparation - Experimentation and Modeling - Field Deployable Injection Strategy Development * Summary

318

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

LBNL's Consolidated Sequestration Research Program (CSRP) Project Number FWP ESD09-056 Barry Freifeld Lawrence Berkeley National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefits and Goals of GEO-SEQ * Technical Status - Otway Project (CO2CRC) - In Salah (BP, Sonatrach and Statoil) - Ketzin Project (GFZ, Potsdam) - Aquistore (PTRC) * Accomplishments and Summary * Future Plans 3 Benefit to the Program * Program goals being addressed: - Develop technologies to improve reservoir storage capacity estimation - Develop and validate technologies to ensure 99 percent storage permanence.

319

Project 283  

NLE Websites -- All DOE Office Websites (Extended Search)

NJ 07039 973-535 2328 ArchieRobertson@fwc.com Sequestration ADVANCED CO 2 CYCLE POWER GENERATION Background This project will develop a conceptual power plant design...

320

Project 197  

NLE Websites -- All DOE Office Websites (Extended Search)

will bring economic value to both the industrial customers and to the participating companies. * Complete project by June 2006. Accomplishments A ceramic membrane and seal...

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS Pittsburgh,...

322

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Interdisciplinary Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford...

323

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for...

324

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* Concrete products in this project * Standard 8" concrete blocks * Standard 4' x 8' fiber-cement boards CO 2 The Goals * Maximizing carbon uptake by carbonation (at least...

325

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Evaluating Potential Groundwater Impacts and Natural Geochemical...

326

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Introduction * Organization * Benefit to Program * Project Overview * Technical Status * Accomplishments to Date...

327

Project 252  

NLE Websites -- All DOE Office Websites (Extended Search)

Stanford Global Climate Energy Project Terralog Technologies TransAlta University of Alaska Fairbanks Washington State Department of Natural Resources Western Interstate...

328

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

research partnership to improve the understanding of CO 2 within coal and shale reservoirs. 2 2 3 Presentation Outline * Program Goal and Benefits Statement * Project...

329

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

mechanistic insights 5 Project Overview: Scope of work * Task 1 - Pipeline and Casing Steel Corrosion Studies * Evaluate corrosion behavior of pipeline steels in CO 2 mixtures...

330

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project Program Goals * Technical...

331

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

* This project pinpoints the critical catalyst features necessary to promote carbon dioxide conversion to acrylate, validate the chemical catalysis approach, and develop an...

332

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources...

333

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number...

334

DSOpilot project (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DSOpilot project (Smart Grid Project) DSOpilot project (Smart Grid Project) Jump to: navigation, search Project Name DSOpilot project Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

335

ADELE Project AACAES (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

ADELE Project AACAES (Smart Grid Project) ADELE Project AACAES (Smart Grid Project) Jump to: navigation, search Project Name ADELE Project AACAES Country Germany Coordinates 51.165691°, 10.451526° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.165691,"lon":10.451526,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

336

Demonstration project Smart Charging (Smart Grid Project) | Open Energy  

Open Energy Info (EERE)

project Smart Charging (Smart Grid Project) project Smart Charging (Smart Grid Project) Jump to: navigation, search Project Name Demonstration project Smart Charging Country Netherlands Headquarters Location Noord-Brabant, Netherlands Coordinates 51.482655°, 5.232169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":51.482655,"lon":5.232169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

337

DataHub project (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

DataHub project (Smart Grid Project) DataHub project (Smart Grid Project) Jump to: navigation, search Project Name DataHub project Country Denmark Headquarters Location Fredericia, Denmark Coordinates 55.570332°, 9.746595° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":55.570332,"lon":9.746595,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

338

ESB Smart Meter Projects (Smart Grid Project) (Limerick, Ireland) | Open  

Open Energy Info (EERE)

Projects (Smart Grid Project) (Limerick, Ireland) Projects (Smart Grid Project) (Limerick, Ireland) Jump to: navigation, search Project Name ESB Smart Meter Projects Country Ireland Headquarters Location Limerick, Ireland Coordinates 52.663857°, -8.626773° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":52.663857,"lon":-8.626773,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

339

Notice of Intent to Prepare an Environmental Impact Statement for the Granby Pumping Plant-Windy Gap Transmission Line Rebuild Project, Grand County, CO (DOE/EIS-0400)(08/10/07)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

040 Federal Register 040 Federal Register / Vol. 72, No. 154 / Friday, August 10, 2007 / Notices g. Filed Pursuant to: 18 CFR 4.200. h. Applicant Contact: David Lovely, Hydro Supervisor, Madison Paper Industries, P.O. Box 129, 3 Main Street, Madison, Maine 04950-0129, (207) 696- 1225. i. FERC Contact: Robert Bell, (202) 502-6062. j. Deadline for filing comments, motions to intervene and protest: August 20, 2007. Please include the project number (P- 2365-040) on any comments or motions filed. All documents (original and seven copies) should be filed with: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper, see 18 CFR

340

Sitewide Categorical Exclusion for Removal of Polychlorinated Biphenyl-Containing Items  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 SWCX for Removal of PCB-Containing Items Revision 0 17 SWCX for Removal of PCB-Containing Items Revision 0 Sitewide Categorical Exclusion for Removal of Polychlorinated Biphenyl-Containing Items Introduction As defined in the U.S. Department of Energy's (DOE) Richland Operations Office Integrated An application of DOE categorical exclusions described in 10 CFR 1021, Appendices A and B, which may apply to Hanford Site proposed actions (activities) that are "sitewide" in nature and extent, which the cognizant DOE Hanford NCO has determined fit within the scope (i.e., same nature and intent, and of the san1e or lesser scope) ofDOE categorical exclusions described in 10 CFR 1021 Appendices A and B. The cognizant DOE Hanford NCO may issue specific sitewide categorical exclusions for use on proposed actions in which separate DOE approval to proceed is

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

NNSA Defense Programs collects nearly 20 large boxes of items for Toys for  

National Nuclear Security Administration (NNSA)

collects nearly 20 large boxes of items for Toys for collects nearly 20 large boxes of items for Toys for Tots | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA Defense Programs collects nearly 20 large ... NNSA Defense Programs collects nearly 20 large boxes of items for Toys for Tots Posted By Office of Public Affairs

342

Two Line Subject Title One Line Title  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UDAC Recommendations UDAC Recommendations Roy Long Technology Manager, EPAct 2005 Title IX, Subtitle J, Section 999 2 Overview of UDAC 2009 Recommendations Recommendation Areas * R&D Program Focus * Program Scope * Process * Program Progress & Value * Societal Impact 3 R&D Program Focus Area * Safety and environmental projects should be considered as separate topics. * Safety and environmental projects should be identified with specific phases of the exploration and production lifecycle. * The project impact assessment utilized in the project selection process should be made public and available to the UDAC. * Fund projects which address the overall safety impact of UDW activity. * Fund projects which address the overall environmental impact of UDW activity. * The metocean program should be strengthened regarding wind and

343

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Space Geodesy, Seismology, Space Geodesy, Seismology, and Geochemistry for Monitoring Verification and Accounting of CO 2 in Sequestration Sites DE-FE0001580 Tim Dixon, University of South Florida Peter Swart, University of Miami U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to program * Goals & objectives * Preliminary InSAR results (site selection phase) * Project location * Project installed equipment * Specific project results * Summary 3 Benefit to the Program * Focused on monitoring, verification, and accounting (MVA) * If successful, our project will demonstrate the utility of low cost, surface

344

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 DE-FE0001159 Advanced Technologies for Monitoring CO 2 Saturation and Pore Pressure in Geologic Formations Gary Mavko Rock Physics Project/Stanford University 2 Presentation Outline * Benefit to the Program * Project Overview * Motivating technical challenge * Approach * Technical Status - Laboratory results - Theoretical modeling * Summary Mavko: Stanford University 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations. - Develop technologies to demonstrate that 99% of injected CO 2 remains in injection zones. * Project benefits statement.

345

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Large Volume Injection of CO Large Volume Injection of CO 2 to Assess Commercial Scale Geological Sequestration in Saline Formations in the Big Sky Region Project Number: DE-FC26-05NT42587 Dr. Lee Spangler Big Sky Carbon Sequestration Partnership Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Goals and Objectives * Project overview * Kevin Dome characteristics * Project design philosophy * Infrastructure * Modeling * Monitoring * Project Opportunities 3 Benefit to the Program Program goals being addressed. * Develop technologies that will support industries' ability to predict CO

346

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D. Colorado School of Mines U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program (Program goals addressed and Project benefits) * Project goals and objectives * Technical status - Project tasks * Technical status - Key findings * Lessons learned * Summary - Accomplishments to date 3 Benefit to the Program * Program goals being addressed. - Develop technologies that will support industries'

347

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Snøhvit CO Snøhvit CO 2 Storage Project Project Number: FWP-FEW0174 Task 4 Principal Investigators: L. Chiaramonte, *J.A. White Team Members: Y. Hao, J. Wagoner, S. Walsh Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Summary & Accomplishments * Appendix 3 Benefit to the Program * The research project is focused on mechanical

348

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

InSalah CO InSalah CO 2 Storage Project Project Number: FWP-FEW0174 Task 2 Principal Investigator: W. McNab Team Members: L. Chiaramonte, S. Ezzedine, W. Foxall, Y. Hao, A. Ramirez, *J.A. White Lawrence Livermore National Laboratory This work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Benefit to Program * Project Goals and Objectives * Technical Status * Accomplishments * Summary * Appendix 3 Benefit to the Program * The research project is combining sophisticated

349

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Complexity and Choice of Complexity and Choice of Model Approaches for Practical Simulations of CO 2 Injection, Migration, Leakage, and Long- term Fate Karl W. Bandilla Princeton University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Project Number DE-FE0009563 2 Presentation Outline * Project Goals and Objectives * Project overview * Accomplishments * Summary 3 Benefit to the Program * The aim of the project is to develop criteria for the selection of the appropriate level of model complexity for CO 2 sequestration modeling at a given site. This will increase the confidence in modeling results, and reduce computational cost when appropriate.

350

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Fabrication Activities Recent customers include: * DOE funded projects including SOFC & high temperature FE materials development * Alloys for medical stent applications *...

351

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy, National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS August 21-23, 2012...

352

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Research and Development Research and Development Project Review Meeting Presenter: John Litynski, PE United States Department of Energy, National Energy Technology Laboratory, U.S. DOE Office of Fossil Energy National Energy Technology Laboratory August 21-23, 2012 Pittsburgh, PA 2 WELCOME 3 * Annual requirement in all cooperative agreements and grants * First complete program review of 126 carbon storage projects - 7 Regional Partnerships (Large scale injection projects) - 14 Infrastructure (Injection, Characterization, systems modeling) - 38 Geologic Storage - 28 Simulation and Risk Assessment - 26 Monitoring, Verification, and Accounting (MVA) - 6 CO2 Use and Reuse - 7 Training Centers * Report on technical progress and financial status of projects * 55 Posters

353

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Atlas of the United States and Canada Dawn Deel, Project Manager, Sequestration Division October 5, 2010 2 Background and Statistics Atlas I - March 2007 * First coordinated...

354

EC Transmission Line Materials  

SciTech Connect

The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

Bigelow, Tim S [ORNL

2012-05-01T23:59:59.000Z

355

Plutonium Finishing Plant (PFP) Standby Power System Commercial Grade Item (CGI) Critical Characteristics  

SciTech Connect

PFP's Standby Power System consists of the diesel generators, the generator control system, Rm 308 UPS, switchgear batteries, and the electrical equipment used to distribute this power. Due to the nature of the equipment and its use throughout general industry, the majority of the system falls within the CGI definition HNF-PRO-268, ''Control of Purchased Items and Services'' and HNF-PRO-1819, ''PHMC Engineering Requirements'' require that the critical characteristics of CGI-procured equipment be established in an engineering document prior to placing the order. HNF-5043 established these critical characteristics for the Standby Power System. This modification adds several items to the document.

DEHKORDI, N.H.

2000-04-12T23:59:59.000Z

356

Electrical Effects of HVDC Transmission Lines  

Science Conference Proceedings (OSTI)

Electrical effects can constrain the design of prospective high-voltage direct current (HVDC) lines operating either alone or sharing the same rights of way structures with high-voltage alternate current (HVAC) lines. In 2013, the Electric Power Research Institute (EPRI) research on HVDC electrical effects focused on electric field and ion density at ground level. The ultimate goal of the project is to calculate with confidence these electrical effects. The algorithms on which the software currently ...

2013-11-08T23:59:59.000Z

357

Boron-10 Lined Proportional Counter Wall Effects  

SciTech Connect

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project 'Coincidence Counting With Boron-Based Alternative Neutron Detection Technology' at Pacific Northwest National Laboratory (PNNL) for development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube based system in the configuration of a coincidence counter. This report provides information about how variations in proportional counter radius and gas pressure in a typical coincident counter design might affect the observed signal from boron-lined tubes. A discussion comparing tubes to parallel plate counters is also included.

Siciliano, Edward R.; Kouzes, Richard T.

2012-05-01T23:59:59.000Z

358

EC Transmission Line Risk Identification and Analysis  

SciTech Connect

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

359

Western LNG project - Project summary  

Science Conference Proceedings (OSTI)

The Western LNG Project is a major new undertaking involving the liquefaction of conventional natural gas from the Western Canadian Sedimentary Basin at a plant on the British Columbia north coast. The gas in its liquid form will be shipped to Japan for consumption by utility companies. The Project represents a new era in gas processing and marketing for the Canadian natural gas industry.

Forgues, E.L.

1984-02-01T23:59:59.000Z

360

Design considerations for solar industrial process heat systems: nontracking and line focus collector technologies  

DOE Green Energy (OSTI)

Items are listed that should be considered in each aspect of the design of a solar industrial process heat system. The collector technologies covered are flat-plate, evacuated tube, and line focus. Qualitative design considerations are stressed rather than specific design recommendations. (LEW)

Kutscher, C.F. (ed.)

1981-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Leakage Mitigation Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number: FE0004478 Robin Gerlach Al Cunningham, Lee H Spangler Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Motivation & Benefit to the Program (required) * Benefit to the Program and Project Overview (required) * Background Information * Accomplishments to Date - Injection strategy development (control and prediction) - Large core tests - ambient pressure - Large core tests - high pressure - Small core tests - high pressure - MCDP, permeability and porosity assessments * Progress Assessment and Summary

362

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 Leakage Mitigation CO2 Leakage Mitigation using Engineered Biomineralized Sealing Technologies Project Number FE0004478 Lee H Spangler, Al Cunningham, Robin Gerlach Energy Research Institute Montana State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Motivation * Background information * Large core tests - ambient pressure * Large core tests - high pressure 3 Benefit to the Program Program goals being addressed. Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. Project benefits statement. The Engineered Biomineralized Sealing Technologies

363

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS CCS Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Benefit to the Program * Program goals being addressed. - Increased control of reservoir pressure, reduced risk of CO2 migration, and expanded formation storage capacity. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints on CCS deployment and provide insight into

364

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Multiphase of Multiphase Flow for Improved Injectivity and Trapping 4000.4.641.251.002 Dustin Crandall, URS PI: Grant Bromhal, NETL ORD Morgantown, West Virginia U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the program * Project overview * Breakdown of FY12 project tasks * Facilities and personnel * Task progress to date * Planned task successes * Tech transfer and summary 3 Benefit to the Program * Program goal being addressed - Develop technologies that will support industries' ability to predict CO

365

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CCS: CCS: Life Cycle Water Consumption for Carbon Capture and Storage Project Number 49607 Christopher Harto Argonne National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Benefit to the Program * Program goals being addressed. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness. * Project benefits statement. - This work supports the development of active reservoir management approaches by identifying cost effective and environmentally benign strategies for managing extracted brines (Tasks 1 + 2). - This work will help identify water related constraints

366

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Resources International, Inc. Advanced Resources International, Inc. U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary * Appendix 3 Benefit to the Program * Program goal being addressed: - Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Project benefits statement: - This research seeks to develop a set of robust mathematical modules to predict how coal and shale permeability and

367

PFBC Utility Demonstration Project  

Science Conference Proceedings (OSTI)

This report provides a summary of activities by American Electric Power Service Corporation during the first budget period of the PFBC Utility Demonstration Project. In April 1990, AEP signed a Cooperative Agreement with the US Department of Energy to repower the Philip Sporn Plant, Units 3 4 in New Haven, West Virginia, with a 330 KW PFBC plant. The purpose of the program was to demonstrate and verify PFBC in a full-scale commercial plant. The technical and cost baselines of the Cooperative Agreement were based on a preliminary engineering and design and a cost estimate developed by AEP subsequent to AEP's proposal submittal in May 1988, and prior to the signing of the Cooperative Agreement. The Statement of Work in the first budget period of the Cooperative Agreement included a task to develop a preliminary design and cost estimate for erecting a Greenfield plant and to conduct a comparison with the repowering option. The comparative assessment of the options concluded that erecting a Greenfield plant rather than repowering the existing Sporn Plant could be the technically and economically superior alternative. The Greenfield plant would have a capacity of 340 MW. The ten additional MW output is due to the ability to better match the steam cycle to the PFBC system with a new balance of plant design. In addition to this study, the conceptual design of the Sporn Repowering led to several items which warranted optimization studies with the goal to develop a more cost effective design.

Not Available

1992-11-01T23:59:59.000Z

368

BOREAS Survey On-Line  

NLE Websites -- All DOE Office Websites (Extended Search)

FF33"> FF33"> BOREAS Survey On-Line To improve the BOREAS and BOREAS Follow-On data sets and to meet users' needs, we are conducting a survey. The BOREAS and BOREAS Follow-On data sets continue to be important products at the ORNL DAAC. To date we have provided over 8,000 data products from these projects to nearly 1,500 users. We invite you to fill out this survey, identifying any problems you had with the data and documentation or any difficulties you experienced in finding and acquiring the data sets. Information you provide will enable us to address problems that need attention. It will also help us determine which aspects of the BOREAS and BOREAS Follow-On information need to be expanded. You can complete the survey at the BOREAS Home Page. After you complete the on-line survey, submit your answers to the ORNL

369

MHK Projects/Portugal Pre Commercial Pilot Project | Open Energy  

Open Energy Info (EERE)

Portugal Pre Commercial Pilot Project Portugal Pre Commercial Pilot Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

370

MHK Projects/Mohawk MHK Project | Open Energy Information  

Open Energy Info (EERE)

MHK Project MHK Project < MHK Projects Jump to: navigation, search << Return to the MHK database homepage Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":5,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"350px","centre":false,"title":"","label":"","icon":"File:Aquamarine-marker.png","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

371

Nuclear reactor overflow line  

DOE Patents (OSTI)

The overflow line for the reactor vessel of a liquid-metal-cooled nuclear reactor includes means for establishing and maintaining a continuous bleed flow of coolant amounting to 5 to 10% of the total coolant flow through the overflow line to prevent thermal shock to the overflow line when the reactor is restarted following a trip. Preferably a tube is disposed concentrically just inside the overflow line extending from a point just inside the reactor vessel to an overflow tank and a suction line is provided opening into the body of liquid metal in the reactor vessel and into the annulus between the overflow line and the inner tube.

Severson, Wayne J. (Pittsburgh, PA)

1976-01-01T23:59:59.000Z

372

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Web-based CO Web-based CO 2 Subsurface Modeling Geologic Sequestration Training and Research Project Number DE-FE0002069 Christopher Paolini San Diego State University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Project benefits and goals. * Web interface for simulating water-rock interaction. * Development of, and experience teaching, a new Carbon Capture and Sequestration course at San Diego State University. * Some noteworthy results of student research and training in CCS oriented geochemistry. * Status of active student geochemical and geomechancal modeling projects.

373

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Co-Sequestration Co-Sequestration Studies Project Number 58159 Task 2 B. Peter McGrail Pacific Northwest National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 and mixed gas storage capacity in various geologic settings - Demonstrate fate of injected mixed gases * Project benefits statement:

374

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis of CO 2 Exposed Wells to Predict Long Term Leakage through the Development of an Integrated Neural- Genetic Algorithm Project DE FE0009284 Boyun Guo, Ph.D. University of...

375

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER SUMNER COUNTY, KANSAS Project Number DE-FE0006821 W. Lynn Watney Kansas Geological Survey Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Fountainview Wednesday 8-21-12 1:10-1:35 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Acknowledgements & Disclaimer Acknowledgements * The work supported by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL) under Grant DE-FE0002056 and DE- FE0006821, W.L. Watney and Jason Rush, Joint PIs. Project is managed and

376

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

0-22, 2013 0-22, 2013 Collaborators Zhengrong Wang, Yale University Kevin Johnson, University of Hawaii 2 Presentation Outline * Program Focus Area and DOE Connections * Goals and Objectives * Scope of Work * Technical Discussion * Accomplishments to Date * Project Wrap-up * Appendix (Organization Chart, Gantt Chart, and Bibliography 3 Benefit to the Program * Program goals addressed: - Technology development to predict CO 2 storage capacity - Demonstrate fate of injected CO 2 and most common contaminants * Project benefits statement: This research project conducts modeling, laboratory studies, and pilot-scale research aimed at developing new technologies and new systems for utilization of basalt formations for long term subsurface storage of CO 2 . Findings from this project

377

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

behavior of shales as behavior of shales as seals and storage reservoirs for CO2 Project Number: Car Stor_FY131415 Daniel J. Soeder USDOE/NETL/ORD U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Project Overview: Goals and Objectives * Program Goals - Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. - Develop technologies to improve reservoir storage efficiency while ensuring containment effectiveness * Project Objectives - Assess how shales behave as caprocks in contact with CO 2 under a variety of conditions - Assess the viability of depleted gas shales to serve as storage reservoirs for sequestered CO

378

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 leakage and cap rock remediation DE-FE0001132 Runar Nygaard Missouri University of Science and Technology U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the program * Project overview * Technical status * Accomplishments to date * Summary 2 3 Benefit to the Program * Program goals being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. * Project benefits statement. - The project develops a coupled reservoir and geomechanical modeling approach to simulate cap rock leakage and simulate the success of remediation

379

LUCF Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

RZWR'HVLJQDQG RZWR'HVLJQDQG +RZWR'HVLJQDQG ,PSOHPHQW&DUERQ ,PSOHPHQW&DUERQ 0HDVXULQJDQG0RQLWRULQJ 0HDVXULQJDQG0RQLWRULQJ $.WLYLWLHVIRU/8&) $.WLYLWLHVIRU/8&) 3URMH.WV 3URMH.WV Sandra Brown Winrock International sbrown@winrock.org Winrock International 2 3URMH.WGHVLJQLVVXHV 3URMH.WGHVLJQLVVXHV z Baselines and additionality z Leakage z Permanence z Measuring and monitoring z Issues vary with projects in developed versus developing countries Winrock International 3 /HDNDJH /HDNDJH z Leakage is the unanticipated loss or gain in carbon benefits outside of the project's boundary as a result of the project activities-divide into two types: - Primary leakage or activity shifting outside project area - Secondary leakage or market effects due to

380

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

"Carbonsheds" as a Framework for Optimizing US CCS Pipeline Transport on a Regional to National Scale DOE-ARRA Project Number DE-FE0001943 Lincoln Pratson Nicholas School of the...

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Project 114  

NLE Websites -- All DOE Office Websites (Extended Search)

Prototech Company SRI International Kellogg, Brown, and Root ChevronTexaco Sd-Chemie, Inc. COST Total Project Value 20,320,372 DOENon-DOE Share 15,326,608 4,993,764...

382

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

383

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Laboratory U.S. Department of Energy Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23,...

384

Project 134  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Goal To demonstrate a "whole plant" approach using by-products from a coal-fired power plant to sequester carbon in an easily quantifiable and verifiable form. Objectives...

385

MANHATTAN PROJECT  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy traces its origins to World War II and the Manhattan Project effort to build the first atomic bomb. As the direct descendent of the Manhattan Engineer District, the...

386

Project 310  

NLE Websites -- All DOE Office Websites (Extended Search)

carbohydrate generated from agricultural enterprises in the U.S., such as corn wet-milling. This project is studying the production of a suite of specialty chemicals by...

387

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

G., 2011, Design and package of a 14CO2 field analyzer: the Global Monitor Platform (GMP). Proceedings of SPIE, v 8156, p. 81560E 17 DOE-NETL PROJECT REVIEW MEETING 08-21-2012...

388

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Model Complexity in Geological Carbon Model Complexity in Geological Carbon Sequestration: A Design of Experiment (DoE) & Response Surface (RS) Uncertainty Analysis Project Number: DE-FE-0009238 Mingkan Zhang 1 , Ye Zhang 1 , Peter Lichtner 2 1. Dept. of Geology & Geophysics, University of Wyoming, Laramie, Wyoming 2. OFM Research, Inc., Santa Fe, New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Project major goals and benefits; * Detailed project objectives & success criteria; * Accomplishments to date; * Summary of results; * Appendix (organization chart; Gantt chart; additional results). Dept. of Geology & Geophysics, University of Wyoming

389

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Region Region DE-FE0001812 Brian J. McPherson University of Utah U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Acknowledgements * NETL * Shell * Tri-State * Trapper Mining * State of Colorado 3 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 4 Presentation Outline * Program Benefits * Project / Program Goals * Technical Status: Finalizing 10-Point Protocol for CO 2 Storage Site Characterization * Key Accomplishments * Summary 5 Benefit to the Program Program Goals Being Addressed by this Project

390

Project 297  

NLE Websites -- All DOE Office Websites (Extended Search)

of this project is to utilize pure oxygen at a feed rate of less than 10% of the stoichiometric requirement in demonstrating the use of oxygen-enhanced combustion in meeting...

391

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D...

392

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Research on Probabilistic Hydro-Thermo-Mechanical (HTM) Modeling of CO 2 Geological Sequestration (GS) in Fractured Porous Rocks Project DE-FE0002058 Marte Gutierrez, Ph.D....

393

BlackLining Demo BlackLining Demo  

E-Print Network (OSTI)

BlackLining Demo BlackLining Demo BlackLining Demo YOUR PAYCHECKPAYROLL TAXES AND EMPLOYMENT LAW BY SPONSORED BY #12;BlackLining Demo e BlackLining Demo e BlackLining Demo e AMERICAN PAYROLL ASSOCIATION i Design by PRIWORKS.com. Images from Thinkstock.com. #12;BlackLining Demo BlackLining Demo Black

Harms, Kyle E.

394

Microsoft Word - BSA_Commercial_Items_Rev12_Jan_2013.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

Comm, Rev. 12; (Jan-13) 1 of 12 Comm, Rev. 12; (Jan-13) 1 of 12 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR COMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Table of Contents Article 1 DEFINITIONS ................................................................................................................... 2 Article 2 ORDER OF PRECEDENCE ............................................................................................. 2 Article 3 ACCEPTANCE OF AGREEMENT, SURVIVABILITY ................................................. 3 Article 4 COMPLETE AGREEMENT ............................................................................................. 3 Article 5 RESPECTFUL WORKPLACE POLICY .......................................................................... 3

395

Microsoft Word - BSA_NonCommercial_Items_Rev13_Apr_2013.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

3; (Apr-13) 1 of 21 3; (Apr-13) 1 of 21 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NONCOMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Table of Contents Article 1 DEFINITIONS ................................................................................................................... 3 Article 2 ORDER OF PRECEDENCE ............................................................................................. 3 Article 3 ACCEPTANCE OF AGREEMENT, SURVIVABILITY ................................................. 4 Article 4 COMPLETE AGREEMENT ............................................................................................. 4 Article 5 RESPECTFUL WORKPLACE POLICY .......................................................................... 4

396

DOE Hosts Festival to Collect Items for Area Food Banks | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Festival to Collect Items for Area Food Banks Festival to Collect Items for Area Food Banks DOE Hosts Festival to Collect Items for Area Food Banks July 1, 2012 - 12:00pm Addthis The DOE Feeds Families Fest and Hunger Awareness Event are from 11 a.m. to 2 p.m. at the Forrestal West Plaza in Washington, D.C. The DOE Feeds Families Fest and Hunger Awareness Event are from 11 a.m. to 2 p.m. at the Forrestal West Plaza in Washington, D.C. WASHINGTON, D.C. - Deputy Secretary of Energy Daniel Poneman and a representative of the Capital Area Food Bank are among the guest speakers at an event this Tuesday, July 31, to collect food items for the DOE Feeds Families drive. The DOE Feeds Families Fest and Hunger Awareness Event are from 11 a.m. to 2 p.m. at the Forrestal West Plaza in Washington, D.C. The fest features an

397

Microsoft Word - BSA_NonCommercial_Items_Rev12_Jan_2013.docx  

NLE Websites -- All DOE Office Websites (Extended Search)

2; (Jan-13) 1 of 21 2; (Jan-13) 1 of 21 BROOKHAVEN SCIENCE ASSOCIATES, LLC GENERAL TERMS AND CONDITIONS FOR NONCOMMERCIAL ITEMS AT BROOKHAVEN NATIONAL LABORATORY Table of Contents Article 1 DEFINITIONS ................................................................................................................... 3 Article 2 ORDER OF PRECEDENCE ............................................................................................. 3 Article 3 ACCEPTANCE OF AGREEMENT, SURVIVABILITY ................................................. 4 Article 4 COMPLETE AGREEMENT ............................................................................................. 4 Article 5 RESPECTFUL WORKPLACE POLICY .......................................................................... 4

398

Peer-to-peer inventory management of returnable transport items: A design science approach  

Science Conference Proceedings (OSTI)

The packaged gas industry suffers from the loss of gas cylinders due to ineffective inventory management and lack of suitably robust identification technologies. This paper takes a design science approach to this problem and contributes a prototype inventory ... Keywords: Inventory, Packaged gas, RFID, Returnable transport item, Wireless sensor network

Alex Mason; Andy Shaw; Ahmed Al-Shamma'a

2012-04-01T23:59:59.000Z

399

Virtual item sales as a revenue model: identifying attributes that drive purchase decisions  

Science Conference Proceedings (OSTI)

The global market for virtual items, characters and currencies was estimated to exceed 2.1 Billion USD in 2007. Selling virtual goods for real money is an increasingly common revenue model not only for online games and virtual worlds, but for social ... Keywords: Business model, Consumer behaviour, Online communities, Purchase drivers, RMT, Virtual consumption

Vili Lehdonvirta

2009-06-01T23:59:59.000Z

400

Plutonium Finishing Plant (PFP) Criticality Alarm System Commercial Grade Item (CGI) Critical Characteristics  

SciTech Connect

This document specifies the critical characteristics for Commercial Grade Items (CGI) procured for PFP's criticality alarm system as required by HNF-PRO-268 and HNF-PRO-1819. These are the minimum specifications that the equipment must meet in order to properly perform its safety function. There may be several manufacturers or models that meet the critical characteristics for any one item. PFP's Criticality Alarm System includes the nine criticality alarm system panels and their associated hardware. This includes all parts up to the first breaker in the electrical distribution system. Specific system boundaries and justifications are contained in HNF-SD-CP-SDD-003, ''Definition and Means of Maintaining the Criticality Detectors and Alarms Portion of the PFP Safety Envelope.'' The procurement requirements associated with the system necessitates procurement of some system equipment as Commercial Grade Items in accordance with HNF-PRO-268, ''Control of Purchased Items and Services.''

WHITE, W.F.

1999-09-16T23:59:59.000Z

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Personalized mobile English vocabulary learning system based on item response theory and learning memory cycle  

Science Conference Proceedings (OSTI)

Since learning English is very popular in non-English speaking countries, developing modern assisted-learning tools that support effective English learning is a critical issue in the English-language education field. Learning English involves memorization ... Keywords: English vocabulary learning, Item response theory, Learning memory cycle, Mobile learning, Personalized learning

Chih-Ming Chen; Ching-Ju Chung

2008-09-01T23:59:59.000Z

402

Extracting Hyponyms of Prespecified Hypernyms from Itemizations and Headings in Web Documents  

E-Print Network (OSTI)

Extraction Algorithm Car Company List Toyota Honda Nissan Car List Toyota Honda Nissan (A) (B) Figure 1. A hyponym tends to have more than one hypernym. For instance, "Toyota" can have at least two hypernyms, because the itemizations suggesting that "Toyota" is a "car" are likely to again include the names

403

Guideline for the Utilization of Commercial Grade Items in Nuclear Safety Related Applications (NCIG-07)  

Science Conference Proceedings (OSTI)

The reduced availability of spare and replacement parts designed specifically for nuclear safety related components has made it necessary for utilities to purchase commercial grade parts. This study, the seventh in a series cosponsored by the Nuclear Construction Issues Group (NCIG), outlines an acceptance procedure for ensuring that commercial grade items conform with requirements for their use in safety related applications.

1988-06-01T23:59:59.000Z

404

Marine surveys aid gas line  

Science Conference Proceedings (OSTI)

Detailed marine surveys helped B.C. Hydro, a Canadian gas distribution utility, select the submarine route portion of the proposed Vancouver Island gas pipeline system. In 1984, after a series of government hearings, B.C. Hydro's route selection was adopted by the British Columbia Provincial Government. Vancouver Island is the last major population center in Western Canada not supplied with natural gas. In fact, studies of a gas pipeline to the island have been carried out periodically over the past 30 years. But until recently, all schemes have appeared unattractive because of a combination of technical, economic, and political factors. The proposed Vancouver Island project which is awaiting funding, consists of a dual 52.7-km marine transmission pipeline link from the mainland to the island. Diameter of this portion of line will be either 12 of 16-in. Also, part of the proposed system will be an 18.5-km line on the mainland, a 280-km transmission pipeline on the island, compression facilities, and distribution systems in the major population centers. Diameters for the land portions will vary between 6 and 24 in. For several months in late 1983 and early 1984, the project was the subject of public hearings held by the British Columbia Utilities Commission. This process was complicated when two companies applied to construct and operate the marine pipeline link to the island using completely different routes and techniques. In July 1984, the commission recommended to the Provincial Government that B.C. Hydro's proposal for the marine pipeline be accepted. It further recommended that an Energy Project Certificate for construction of the pipeline link to the island be awarded to B.C. Hydro. The recommendation was accepted by the Provincial Government and the project now awaits a funding agreement between the Federal and Provincial Governments.

Park, C.A.; Baines, F.A. Koenig, H.L.

1986-05-05T23:59:59.000Z

405

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Neaton Neaton Jeff Neaton Director, Molecular Foundry Senior Faculty Scientist, Theory of Nanostructured Materials jbneaton@lbl.gov 510.486.4527 personal website Biography Jeffrey B. Neaton is the Director of the Molecular Foundry, where he also serves as a Senior Faculty Scientist in the Theory of Nanostructured Materials Facility. Dr. Neaton received a B.S. in Physics and Astrophysics from the University of Minnesota and a Ph.D. in Physics from Cornell University. He was a Departmental Postdoctoral Associate in Physics at Rutgers University prior to joining the Molecular Foundry, first as a postdoc and then as a staff member. In 2009 he was award the Presidential Early Career Award for Scientists and Engineers, and 2010 he was an National Academy of Sciences Kavli Fellow. Since 2012, he has been Division

406

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Revealing nanorod formation with liquid-cell TEM Revealing nanorod formation with liquid-cell TEM Sequential TEM images show Pt3Fe nanorods forming by first making a kinked chain which then straightens out. On right, High-resolution STEM images reveal changes in crystal orientation as the chains relax. Materials Science Division researcher Haimei Zheng, the Molecular Foundry's Stephen Whitelam, and colleagues have imaged iron-platinum nanoparticle forming from solution, helping resolve a decades-long debate about growth dynamics. By understanding how nanoparticles grow, researchers can better tailor their properties for cheap, efficient energy-related technologies. Researchers have long assumed that nanoparticles grow in solution as molecules gradually attach to a nanoparticle nucleus, but recently they

407

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering electron nanoconduits in living bacteria Engineering electron nanoconduits in living bacteria This schematic shows that balanced expression of the Mtr electron conduit from Shewanella oneidensis in Escherichia coli enables E. coli to pass electrons across the membrane to an anode. Scientific Achievement A few specialized bacteria contain electron transfer protein complexes - electron nanoconduits - that allow them to reduce or oxidize an electrode. By exploring factors that control the synthesis of these electron nanoconduits, the model microbe Escherichia coli was engineered to deliver current to an electrode. Significance This work identifies conditions that allow for this electron transport system to be synthesized and function as electrical interface in non-native cell types. These cells can then interact directly with electronics,

408

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Making a Map for Nanotube Exploration Making a Map for Nanotube Exploration Figures: Electron diffraction patterns and Rayleigh spectra of carbon nanotubes with different chiral indices. Inset, top, an illustration of a single nanotube suspended across a gapped substrate for measurement. An international team of scientists headed by Feng Wang of the Materials Science Division of Berkeley Lab and Enge Wang of the International Center for Quantum Materials in Beijing, has mapped out an "atlas" of key structural and optical properties of carbon nanotubes. By painstakingly measuring both electron diffraction and optical scattering for hundreds of samples, the team created a reference to accelerate future nanotube studies for fundamental physics research as well as optoelectronic and photonic

409

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Gang (Gary) Ren Gang (Gary) Ren Ren Staff Scientist, Imaging and Manipulation of Nanostructures gren@lbl.gov 510.495.2375 personal website Biography Education B.A., Theoretical Physics, Lanzhou University, China, 1986-1990 M.S., Theoretical Physics (General relativity and gauge theory), Lanzhou University, China, 1990-1993, Advisor: Prof. Yi-shi Duan. Thesis: "Theory and Application of 2+1 Dimensional Topological Current" Ph.D. Material Physics (Electron microscopy), Univ. of Science and Technology Beijing, and Beijing Laboratory of Electron Microscopy, Chinese Academy of Science, Beijing, China, 1993-1997, Advisor: Profs. Lian-mao Peng (2012 chair of IUCr -Commission of Electron crystallography) and Kehsin Kuo, Thesis: "Quantitative Electron Diffraction Theory and

410

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Making Smart Windows Even Smarter Making Smart Windows Even Smarter Nanocrystals of indium tin oxide (shown here in blue) embedded in a glassy matrix of niobium oxide (green) form a composite material that can switch between NIR-transmitting and NIR-blocking states with a small jolt of electricity. A synergistic interaction in the region where glassy matrix meets nanocrystal increases the potency of the electrochromic effect. Scientific Achievement Researchers have created a thin coating of nanocrystals embedded in glass that can dynamically modify sunlight as it passes through a window. Significance and Impact Unlike existing technologies, the coating provides selective control over visible light and heat-producing near-infrared (NIR) light, so windows can maximize both energy savings and occupant comfort in a wide range of

411

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Enhancing Electron Photoemission with Nanopillar Array Enhancing Electron Photoemission with Nanopillar Array Figures: An array of nano-sized gold pillars, (a), creates a plasmonic surface resonance. (B), photoelectron kinetic energy spectrum for electrons ejected from the nanopillar array, showing significant increases compared to a flat gold surface. Working with the Molecular Foundry's Bruce Harteneck, researchers in the Lab's Ultrafast Materials and Chemical Sciences programs have verified and measured a boost in photoemitted-electron energies when assisted by the plasmonic field of a gold nanopillar array. Such enhancement provides a way to investigate plasmon dynamics, important for possible coupling to active electronics. Groups of electrons on a metal surface can oscillate coherently, a phenomenon known as a surface plasmon resonance. When excited by ultrafast

412

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Delia Milliron Delia Milliron Milliron Staff Scientist, Inorganic Nanostructures Synthesis dmilliron@lbl.gov 510.486.6723 personal website Biography Delia J. Milliron is a Staff Scientist at Lawrence Berkeley National Laboratory's Molecular Foundry, a research center and user facility for nanoscience supported by the U. S. Department of Energy. She received her PhD in Chemistry from the University of California, Berkeley, in 2004. From 2004 to 2008 she worked for IBM's research division, initially as a postdoctoral researcher and subsequently as a member of the research staff. Her research is motivated by the potential for nanomaterials to introduce new functionality to and reduce manufacturing costs of energy technologies. Her group's activities span from the fundamental chemistry of nanomaterials

413

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Yi Liu Yi Liu Liu Staff Scientist, Organic and Macromolecular Synthesis YLiu@lbl.gov 510.486.6287 personal website Biography Yi Liu is a Staff Scientist in the Organic and Macromolecular Synthesis Facility. He obtained a Ph.D. in Chemistry in 2004 from the University of California, Los Angeles under the direction of Sir. J. Fraser Stoddart. After his postdoctoral research with Professor K. Barry Sharpless at the Scripps Research Institute, San Diego, he joined the Foundry in 2006 as an independent Principle Investigator and was promoted to the career Staff Scientist in 2011. Research Interests Dr. Liu's research aims to achieve coherent control of functionality and properties across different scales through molecular level design and synthesis. With the developed materials chemistry, Dr. Liu has not only

414

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

15, 2013 15, 2013 Time: 11:00 am Speaker: Paul Abbyad, Santa Clara University Title: Microfluidic Droplet Arrays for the Study of Red Blood Cell Sickling Location: 67-3111 Chemla room We have developed a novel microfluidic device to study individual red blood cells in droplet arrays. This is a two-phase system where aqueous droplets containing cells are produced and transported in inert carrier oil. Droplets are anchored into an array by the reduction in their surface energy as they enter into microfabricated depressions. Thus, microdroplets are anchored and arranged in a 2-dimensional array against the flow of the carrier oil. The perfluorinated carrier oil has a high solubility for gases and is used as both a sink and source for oxygen exchange with the anchored

415

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Holistic Cell Design by Berkeley Lab Scientists Leads to High-Performance, Holistic Cell Design by Berkeley Lab Scientists Leads to High-Performance, Long Cycle-Life Lithium-Sulfur Battery Researchers at Berkeley Lab, including the Molecular Foundry, have demonstrated in the laboratory a lithium-sulfur (Li/S) battery that has more than twice the specific energy of lithium-ion batteries, and that lasts for more than 1,500 cycles of charge-discharge with minimal decay of the battery's capacity. This is the longest cycle life reported so far for any lithium-sulfur battery. Demand for high-performance batteries for electric and hybrid electric vehicles capable of matching the range and power of the combustion engine encourages scientists to develop new battery chemistries that could deliver more power and energy than lithium-ion batteries, currently the best

416

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Frank Ogletree Frank Ogletree Ogletree Staff Engineer, Imaging and Manipulation of Nanostructures dfogletree@lbl.gov 510.486.4862 Biography Education Postdoctoral Research Fellow with Miquel Salmeron developing ultra-high vacuum scanning tunneling microscopy in the Materials and Chemical Sciences Division, Lawrence Berkeley Laboratory, 1987 - 1988. Ph.D. in Experimental Solid State Physics, 1986, University of California, Berkeley, California. Thesis title: "Extending the Range of Low Energy Electron Diffraction (LEED) Surface Structure Determination", advisor Prof. G. A. Somorjai, Department of Chemistry. A.B. with honors in Physics, 1977, College of the University of Chicago, Chicago, Illinois. Previous Professional Positions Staff Engineer/Physicist and acting Lead Scientist, Molecular Foundry

417

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Porous Semiconducting Films Tailored for Future Energy Storage and Porous Semiconducting Films Tailored for Future Energy Storage and Conversion Devices Mesoporous films switch composition from CdSe to PbSe, Cu2Se, and Ag2Se through cation exchange: The architecture of these porous films remained intact and the chemical transformations were demonstrated to be reversible. This robustness is promising for various applications as it suggests that electronic and mechanical properties can be maintained through multiple processing and transformation stages. Scientific Achievement Molecular Foundry researchers have developed a method to create and control mesoporous architecture in metal chalcogenides (a class of semiconductors used in light- and energy-harvesting devices) that was maintained during reversible chemical transformations.

418

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Schwartzberg Schwartzberg SSchwartzberg Staff Engineer, Nanofabrication AMSchwartzberg@lbl.gov 831.247.4932 Biography Dr. Schwartzberg is a Bay Area and California native, growing up in the East Bay Area. He performed both his undergraduate and Ph.D. work at UC Santa Cruz under Professor Jin Z. Zhang in Physical Chemistry. While at Santa Cruz, he also worked at Lawrence Livermore National Labs as a graduate research fellow under Professor Thomas Huser. In graduate school, his work focused on metal nanoparticle synthesis and the application of metal nanoparticles, including surface enhanced Raman for sensing, and ultrafast electron dynamics. He received two postdoctoral research fellowships, first with Professor Stephen R. Leone at UC Berkeley, then with Dr. Jeff Urban of the Molecular. Both of these positions involved the

419

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Friday, August 2, 2013 Friday, August 2, 2013 Time: 11:00 am Speaker: Prof. Lian-Mao Peng, Peking University Title: Carbon Nanotube Electronics: Extending the Moore Law to the End of the Roadmap and Beyond Location: 67-3111 Chemla room Hosted by: Gary Ren Carbon nanotubes (CNT) are quasi-one-dimensional materials with unique properties and are ideal material for nanoelectronics. In particular, perfect n-type [1-2] and p-type [3] contacts are now available for controlled injection of electrons into the conduction band and holes into the valence band of the CNT, paving the way for a doping free fabrication of CNT based ballistic CMOS [4], high performance optoelectronic devices [5-6], and integrated circuits [7,8]. The feasibility of this doping free CMOS technology has been demonstrated by fabricating CMOS circuits,

420

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Weber-Bargioni Weber-Bargioni Weber-Bargioni Staff Scientist, Imaging and Manipulation of Nanostructures afweber-bargioni@lbl.gov 510.486.4026 personal website Biography Education University of Konstanz, Germany Physics B.S., 2001 Portland State University Physics M.S., 2003 University of British Columbia Physics Ph.D., 2007 Lawrence Berkeley Nat. Lab Material Science PostDoc 2008-2010 Research Interests Dr. Weber-Bargioni's research revolves around understanding fundamental opto electronic processes at their native length scales. Specifically, he is focused on understanding and eventually controlling exciton transport through complex nano composites, such as small organic molecule semiconducting films, 1, 2, and 3-D nanocrystal assemblies and nanowire systems. This research requires the employment and development of novel

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Uncovering the Intrinsic Size Dependence of Hydriding Phase Transformations Uncovering the Intrinsic Size Dependence of Hydriding Phase Transformations in Nanocrystals Scientific Achievement Revealed fundamental size-dependence of metal nanocrystals undergoing phase transitions. Significance and Impact Findings overturn long-held assumptions about nanoparticle behavior and hold important implications for the future design of hydrogen storage systems, catalysts, fuel cells, and batteries. Research Details Developed a unique optical probe based on luminescence that provided the first direct observations of metal nanocrystals undergoing phase transformations during reactions with hydrogen gas. Used statistical mechanical model to quantify the observational data for palladium nanocubes of all sizes. Rizia Bardhan, Lester O. Hedges, Cary L. Pint, Ali Javey, Stephen

422

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Frantisek Svec Frantisek Svec Svec Facility Director, Organic and Macromolecular Synthesis fsvec@lbl.gov 510.486.7964 personal website Biography Frantisek (Frank) received both degrees B.S. in chemistry and Ph.D. in polymer chemistry from the Institute of Chemical Technology, Prague (Czech Republic) in 1965 and 1969, respectively. In 1976 he joined the Institute of Macromolecular Chemistry of the Czechoslovak Academy of Sciences where he was promoted through the ranks to the Head of Department and the Scientific Secretary of the Institute. He accepted an offer and joined faculty at Cornell University in 1992. Since 1997, he is appointed at the University of California, Berkeley. He currently works as Facility Director in the Molecular Foundry of the Lawrence Berkeley National Laboratory. Dr.

423

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Self-assembled Single-layer 2D Frameworks Self-assembled Single-layer 2D Frameworks In the presence of macrocycle rings, rigid triangular struts are jointed and self-assemble in solution to create a supramolecular organic framework (SOF). Each strut contains functional units that resist stacking and results in single-layer 2D structures. Scientific Achievement Foundry Users have created the first 2D supramolecular organic framework (SOF) with honeycomb periodicity using a novel solution-based self-assembly approach. Significance and Impact Highly ordered and tunable SOFs lead to new layer-by-layer routes to the synthesis of complex architectures, with potential applications in gas purification, absorption, separation, sensing, and catalysis. Research Details A cross-linked 2D framework is assembled in water by joining

424

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Combinatorial Nanoscience Shines in Pure Colors Combinatorial Nanoscience Shines in Pure Colors Green/red purity vs. total intensity, observed in the various lanthanide ion combinations. The Molecular Foundry's Delia Milliron and colleagues have employed a powerful combinatorial approach to synthesize nanocrystals that glow in bright, pure colors when excited with near infrared light. - a process known as upconversion. These nanocrystals may allow for biological imaging with less harmful radiation than current methods, and can be more easily tracked and quantified due to their single color emission. Milliron's team used a wide-sweeping approach to identify promising lanthanide ion combinations, using the automatic synthesis robot, WANDA, able to perform 96 different reactions in parallel. Ultimately four

425

News item  

NLE Websites -- All DOE Office Websites (Extended Search)

Changes in Fermilab Site Security Changes in Fermilab Site Security Site Security Questions and Answers The Department of Energy has recently approved changes to the Fermilab Security Plan. These changes, which will go into effect on January 24, Security Map Fermilab map showing the public areas and restricted sections on site. (Click on image for larger version.) 2005, will ease some of the site access restrictions that have been in place since 9/11 while at the same time enhancing the overall security of the Fermilab site. Here are the highlights of the coming changes in Fermilab site security: A central corridor of public areas, shown on the attached map, will enable the public to visit much of the Fermilab site without the need for visitors' passes. The public areas include most of the recreational

426

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Probing carrier dynamics below the surface of solar cells (A) Schematic of the 2P microscope. 2D hyperspectral maps of lifetime were created by moving the laser excitation throughout the sample. (B) Comparison of lifetimes measured with 1P and 2P microscopy. A 10x difference in lifetime is seen between traditional 1P surface measurements and the 2P sub-surface measurements. Below, cross-section depth maps of two-photon TRPL of CdTe: total PL (left); fast (center) and slow (right) lifetime components of biexponential fit, indicating potential for 3D tomography. Scientific Achievement Optically probed the charge carrier lifetime below the surface of solar materials using two-photon (2P) time-resolved PL mapping, and demonstrated that the traditional one-photon (1P) technique can underestimate the bulk

427

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Deirdre Olynick Deirdre Olynick Olynick Staff Scientist, Nanofabrication dlolynick@lbl.gov 510.495.2893 Biography Education B. S. Engineering, North Carolina State University, Raleigh, N. C. Ph.D. Department of Materials Science and Engineering. University of Illinois at Urbana-Champaign. Advisor: J. Murray Gibson. Fannie and John Hertz Fellowship Thesis: "In situ Studies of Copper Nano-particles Using a Novel Tandem Ultra-High Vacuum Particle Production Chamber Transmission Electron Microscope" Past Professional Positions Applied Materials and Technology and Matrix Integrated Systems, Senior Process Engineer Research Interests Dr. Olynick straddles the boundary between Materials Science and Chemistry to understand the science behind nanofabrication. Dr. Olynick studies

428

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

3, 2013 3, 2013 Time: 11:00 am Speaker: Alex Weber-Bargioni, The Molecular Foundry Title: Investigating the Propagation of Optically Excited States and Optoelectronic Processes in Nano Building Block Assemblies Location: 67-3111 Chemla room Controlling individual excited states and their deliberate movement through a material is one of the ultimate goals that will provide material scientist with a complete new freedom to develop novel material functionalities. Realizing such a control would enable to direct energy to specific sites in a material where specific work can be performed. Nano materials have in principle the potential to realize this vision since the material property determining electronic structure can be tuned via geometry, material composition, interfaces and environment. However, we are

429

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

List List 80+ Reactive Ion Etcher (tool referred to as the RIE by nanofab staff) AAPPTec Apex 396 Peptide Synthesizer AB Sciex TF4800 MALDI-TOF-TOF - Ideal for small molecules and (bio)polymers between 500 and 150,000 Da molecular weights ABM optical contact printer Agilent (Molecular Imaging) PicoPlus Scanning Probe Microscope Agilent 1100 series (ion trap) LC-MS-MS Mass spectrometer Agilent 1100 Series Agilent 1200 nanoHPLC System Agilent 1260 Infinity Agilent analytical HPLC Agilent Capillary Electrophoresis System Agilent Cary 5000 UV-Vis-NIR Spectrophotometer Agilent GC-MS 6890 Chromatograph Agilent Precision Semiconductor Parameter Analyzer Agilent prep and semi-prep HPLC's Aixtron PECVD for carbon nanotubes and graphene Anaerobic chamber Arbin Electrochemical Battery Tester

430

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

A Comprehensive Model for Molecular-Bond Formation and Rupture A Comprehensive Model for Molecular-Bond Formation and Rupture Force spectra of ten different kinds of molecular bonds show transition from near-equilibrium to a kinetic regime. Inset, data re-plotted on the natural axes that emerge from the model show that it provides a universal description of bond breaking across the two regimes. Developed a new model for interpreting molecular-bond force spectra and verified it with measurements of ten different molecular systems Resolves inconsistencies in the standard model and provides a comprehensive description of bond formation and rupture Enables prediction of binding free energy of a molecular system, important for both understanding interactions in natural systems and designing synthetic analogues R.W. Friddle, and J.J. De Yoreo, Lawrence Berkeley National Laboratory; A.

431

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

24, 2013 24, 2013 Time: 11:00 am Speaker: Prof. Holger Schmidt, UC Santa Cruz Title: Detecting and Controlling the Magnetization Dynamics of Single Nanomagnets Location: 67-3111 Chemla room Hosted by Frank Svec: Many emerging spintronics applications will utilize dense arrays of nanomagnetic elements. Device properties depend on both the intrinsic material properties of each element as well as the magnetic environment. Time-resolved magneto-optics provide a means to extract both static and dynamic material parameters and elucidate sub-picosecond dynamic processes. I will review the challenges and capabilities of applying magneto-optic techniques for magnetic characterization of individual nanomagnets, in particular the first observation of single-domain nanomagnet dynamics and

432

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Urban Urban Jeff Urban Facility Director, Inorganic Nanostructures Lead of LBL DOE Thermoelectrics Program (Acting) jjurban@lbl.gov 510.486.4526 Biography Education Postdoctoral Studies in Synthesis and Measurements of Nanocrystal Transistors, Thermoelectrics, and Photovoltaics with Professor Christopher B. Murray, University of Pennsylvania Graduate Studies in Synthesis and Physical Characterization of Transition Metal Oxide Nanostructures with Professor Hongkun Park, Harvard University Research Interests I am interested in the development of new materials and measurement tools for solid-state energy storage and conversion applications. One central topical area of interest involves investigating transport at the organic-inorganic interface. This marriage of "hard" and "soft" materials

433

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Foundry User Wins "Genius Award" Foundry User Wins "Genius Award" Courtesy of John D. and Catherine T. MacArthur Foundation Molecular Foundry User, Craig Fennie, received one of this year's 24 MacArthur Fellowship Awards - commonly known as "Genius Awards" - for his research on the material properties of new nanostructures. Fennie, assistant professor of applied and engineering physics at Weill Cornell Medical College, has designed new materials with electrical, optical and magnetic properties needed for electronics and communication technology. At the Foundry, he has worked with staff and Users in the Theory of Nanostructured Materials Facility to engineer transition metal oxide thin films to access energetically useful optical properties of photoelectrochemistry. Read the story from the MacArthur Foundation.

434

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

October 1, 2013 October 1, 2013 Time: 11:00 am Speaker: Mikhail Zamkov, Bowling Green State University Title: Engineering of Semiconductor Nanocrystals & Nanocrystal Solids for Renewable Energy Applications Location: 67-3111 Chemla room Hosted by Delia Milliron: I will discuss a novel methodology for depositing colloidal semiconductor nanocrystals into all-inorganic solid films with implications both to nanocrystal solar cells and nanocrystal light-emitting devices. The reported strategy utilizes a simple scheme for incorporating PbS or CdSe semiconductor nanocrystals into matrices of a wide-band gap CdS semiconductor for stable and efficient operation of solution-processed devices. The two key benefits of this approach include: (i) all-inorganic architecture promoting superior thermal and chemical stability, and - (ii)

435

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Nanofabrication Facility scabrini@lbl.gov 510.486.7339 Research Interests Micro-nano-fabrication, electron-beam lithography, focused ion beam lithography, focused electron...

436

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

in the lab. The primary objective was to identify influencing factors that may increase the rate of collaboration via analyses of rejected versus accepted Foundry...

437

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Nanostructures WLQueen@lbl.gov 510.486.5526 Biography Education Postdoc with Dr. Craig Brown at the NIST Center for Neutron Research Ph.D in Inorganic Chemistry with...

438

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

CO2 over other species common in exhaust gas, such as nitrogen, making MOFs desirable for carbon capture. The organic linker molecules, on the other hand, have been largely...

439

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

in theoretical physics in 2004 from Oxford University, where he used statistical mechanics to study the dynamics of model glass-forming liquids. He was supervised by Juan P....

440

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

are developing novel solid supports, synthesis formats, screening methodsand sequencing techniques to facilitate the high-throughputscreening of these libraries for novel...

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Engineering Bacteria to Generate Currents Just like electronics, living cells use electrons for energy and information transfer. Despite electrons being a common "language" of the...

442

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

R. W. Falcone, 1997 Research Interests My research is focused on understanding the nano- and meso-scale interactions between localized states in materials (i.e. studying the...

443

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

to directly observe S-layer formation on mica chips, Foundry scientists show that a kinetic trap occurs during protein self-assembly. Some domains become trapped in high-energy...

444

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Beams For the high-rep-rate x-ray beams essential to next generation light sources, electron guns with photocathodes that can deliver tight electron bunches with high charge and...

445

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

of pyridine and amine-based molecules in gold junctions. Right, schematic of scanning electron microscope-based setup used to trap and measure individual molecules. Molecular...

446

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

leader for the Membranes and Mesoscale Assembly at the Joint Center for Artificial Photosynthesis (JCAP). Segalman is also a professor of chemical engineering at UC Berkeley and a...

447

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

employed as radiation detector materials in many fields of applied and fundamental research such as medical imaging, high energy physics, astrophysics, oil exploration and...

448

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Weber-Bargioni Shares Love of Bike Racing with Local Community Weber-Bargioni Shares Love of Bike Racing with Local Community If you've ever tried to take a sharp turn at high speed on a bicycle, you may have wished you knew more about bicycle physics. And while the basic movement feels simple, riding a bike is in fact quite complex. "It turns out the physics of riding a bike are really, really hard," confessed Alex Weber-Bargioni, a Berkeley Lab materials scientist. Weber-Bargioni was addressing a standing-room-only crowd at the Actual Café in North Oakland recently, in the first of a new series called "Actual Science" Sponsored by Berkeley Lab's Materials Sciences Division. A nanoscientist by day, Weber-Bargioni helps pioneer new approaches to studying the way light interacts with matter, a crucial aspect of today's burgeoning solar-energy

449

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

at the Molecular Foundry have designed a thin coating of nanocrystals embedded in glass that can dynamically modify sunlight as it passes through a window. Unlike existing...

450

News Item  

NLE Websites -- All DOE Office Websites (Extended Search)

Seeing in Color at the Nanoscale: Foundry Scientists Develop a New Nanotech Tool to Probe Solar Energy Conversion If nanoscience were television, we'd be in the 1950s. Although...

451

The Wind Project Development Process  

Wind Powering America (EERE)

Wind Project Wind Project Development Process Developed for the National Renewable Energy Laboratory by Dale Osborn Distributed Generation Systems, Inc. September 1998 The Wind Project Development Process Site Selection Land Agreements Wind Assessment Environmental Review Economic Modeling Interconnection Studies Financing Permitting Sales Agreements Turbine Procurement Construction Contracting Operations & Maintenance Site Selection Evidence of Significant Wind Preferably Privately Owned Remote Land Proximity to Transmission Lines Reasonable Road Access Few Environmental Concerns Receptive Community Land Agreements Term: Expected Life of the Turbine Assignable Indemnification Rights Compensation: Percentage of Revenues Reclamation Provision Wind Rights, Ingress/Egress Rights, Transmission Rights

452

The Central Subway Project: San Francisco's Railway to Nowhere?  

E-Print Network (OSTI)

PlanningforMunisThird StreetLight RailProject. anextensionoftheThirdStreetlightrailline,tobeplanningoftheThird StreetLightRailproject,completed

Barrow, J.J.

2012-01-01T23:59:59.000Z

453

CRAD, Safety Basis - Idaho Accelerated Retrieval Project Phase...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Accelerated Retrieval Project Phase II CRAD, Safety Basis - Idaho Accelerated Retrieval Project Phase II February 2006 A section of Appendix C to DOE G 226.1-2 "Federal Line...

454

North Australian Cloud Lines  

Science Conference Proceedings (OSTI)

A satellite classification and climatology of propagating mesoscale cloud fines in northern Australia is presented. These cloud fines range from long, narrow lines of shallow convection to extensive deep convective squall lines with mesoscale ...

W. Drosdowsky; G. J. Holland

1987-11-01T23:59:59.000Z

455

Two Line Subject Title One Line Title  

NLE Websites -- All DOE Office Websites (Extended Search)

CO CO 2 Storage Resource Methodologies Presenter: Angela Goodman Team: Angela Goodman, Grant Bromhal, Brian Strazisar, Traci Rodosta and George Guthrie United States Department of Energy, National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CCUS August 21-23, 2012 Pittsburgh, PA 2 U.S. DEPARTMENT OF ENERGY  OFFICE OF FOSSIL ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY CARBON STORAGE PROGRAM with ARRA Projects Benefits Global Collaborations Technology Solutions Lessons Learned North America Energy Working Group Carbon Sequestration Leadership Forum International Demonstration Projects Canada (Weyburn, Zama,

456

Characterization of Planar Transmission Lines  

Science Conference Proceedings (OSTI)

... References on: On-Wafer Measurement and Calibration, Planar Transmission Line Characterization and Multiconductor Transmission Lines. ...

2011-12-15T23:59:59.000Z

457

U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project Draft Environmental Impact Statement DOE/EIS-0290-D  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B-1 B-1 APPENDIX B FACILITY DESCRIPTION INFORMATION The following descriptions are taken from BNFL-5232-RCRA-01, Rev. 0, Hazardous Waste Management Act/Toxic Substances Control Act (HWMA/TSCA) permit application for the Advanced Mixed Waste Treatment Project (AMWTP) facility. B-1 Nonthermal Treatment Operations Waste containers within the nonthermal treatment areas are managed in a manner to prevent container rupture or leakage and to minimize exposure of AMWTP facility personnel. Operating standards used in conducting nonthermal treatment activities include: * Wastes slated for direct supercompaction have been identified by item description codes, generator- supplied information, and real-time radiography examination. Other wastes for supercompaction and macroencapsulation are sorted, segregated, and size reduced in the pretreatment lines prior to

458

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 Brighton 1&2 2:40 August 20, 2013 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary ORGANIZATIONAL STRUCTURE Modeling CO 2 Sequestration in Saline A quifer and Depleted Oil Reservoir to Evaluate Regional CO 2 Sequestration Potential of Ozark Plateau A quifer System, South-Central Kansas Co-Principal Investigators Co-Principal Investigators Kerry D. Newell -- stratigraphy, geochemistry

459

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Tracer for Tracking Permanent CO 2 Storage in Basaltic Rocks DE-FE0004847 Jennifer Hall Columbia University in the City of New York U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Conservative and Reactive Tracer Techniques * Accomplishments to Date * Summary 3 Benefit to the Program * The goal of the project is to develop and test novel geochemical tracer techniques for quantitative monitoring, verification and accounting of stored CO 2 . These techniques contribute to the Carbon Storage Program's

460

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

and Geotechnical Site and Geotechnical Site Investigations for the Design of a CO 2 Rich Flue Gas Direct Injection Facility Project Number DOE Grant FE0001833 Paul Metz Department of Mining & Geological Engineering University of Alaska Fairbanks U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Presentation Outline * Benefit to the Program * Project Overview: Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix: Not Included in Presentation 3 Benefit to the Program * Carbon Storage Program Major Goals: - Develop technologies that will support industries' ability to

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Scale CO Scale CO 2 Injection and Optimization of Storage Capacity in the Southeastern United States Project Number: DE-FE0010554 George J. Koperna, Jr. Shawna Cyphers Advanced Resources International U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Presentation Outline * Program Goals * Benefits Statement * Project Overview - Goals - Objectives * Technical Status * Accomplishments to Date * Summary * Appendix USDOE/NETL Program Goals * Support industry's ability to predict CO 2 storage capacity in geologic formations to within ±30 percent. * Develop and validate technologies to ensure 99 percent storage permanence. * Develop technologies to improve reservoir storage

462

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SUMNER COUNTY, KANSAS DE-FE0006821 W. Lynn Watney, Jason Rush, Joint PIs Kansas Geological Survey The University of Kansas Lawrence, KS U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Brighton 1&2 Wednesday 8-21-13 1:10-1:35 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary 2 Small Scale Field Test Wellington Field Regional Assessment of deep saline Arbuckle aquifer Project Team DOE-NETL Contract #FE0006821 KANSAS STATE UNIVERSITY 3 L. Watney (Joint PI), J. Rush (Joint PI), J. Doveton, E. Holubnyak, M. Fazelalavi, R. Miller, D. Newell, J. Raney

463

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Seal Repair Using Seal Repair Using Nanocomposite Materials Project Number DE-FE0009562 John Stormont, Mahmoud Reda Taha University of New Mexico U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Ed Matteo, Thomas Dewers Sandia National Laboratories 2 Presentation Outline * Introduction and overview * Materials synthesis * Materials testing and characterization * Annular seal system testing * Numerical simulation * Summary 3 Benefit to the Program * BENEFITS STATEMENT: The project involves the development and testing of polymer-cement nanocomposites for repairing flaws in annular wellbore seals. These materials will have superior characteristics compared to conventional

464

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Wyoming: MVA Techniques for Determining Gas Transport and Caprock Integrity Project Number DE-FE0002112 PIs Drs. John Kaszuba and Kenneth Sims Virginia Marcon University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status - Results - Conclusions - Next Steps * Summary 3 Benefit to the Program * Program goal being addressed. - Develop technologies to demonstrate that 99 percent of injected CO 2 remains in the injection zones. - Monitoring, Verification, and Accounting (MVA). MVA technologies seek to monitor, verify, and

465

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Impact of CO Impact of CO 2 Injection on the Subsurface Microbial Community in an Illinois Basin CCS Reservoir: Integrated Student Training in Geoscience and Geomicrobiology Project Number (DEFE0002421) Dr. Yiran Dong Drs. Bruce W. Fouke, Robert A. Sanford, Stephen Marshak University of Illinois-Urbana Champaign U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefit to the Program * Technical status * Results and discussion * Summary * Appendix 3 Benefit to the Program This research project has developed scientific, technical and institutional collaborations for the development of

466

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Mohammad Piri and Felipe Pereira Mohammad Piri and Felipe Pereira University of Wyoming U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 2013 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status o Experimentation: core-flooding and IFT/CA o Pore-scale modeling modeling * Accomplishments to Date * Summary University of Wyoming 3 Benefit to the Program * Program goal: o 'Develop technologies that will support industries' ability to predict CO 2 storage capacity in geologic formations to within ±30 percent.' * Benefits statement: o The research project is focused on performing reservoir conditions experiments to measure steady-state relative permeabilities,

467

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Monitoring Geological CO Monitoring Geological CO 2 Sequestration using Perfluorocarbon and Stable Isotope Tracers Project Number FEAA-045 Tommy J. Phelps and David R. Cole* Oak Ridge National Laboratory Phone: 865-574-7290 email: phelpstj@ornl.gov (*The Ohio State University) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Developing the Technologies and Building the Infrastructure for CO 2 Storage August 22, 2013 2 Project Overview: Goals and Objectives Goal: Develop methods to interrogate subsurface for improved CO 2 sequestration, field test characterization and MVA, demonstrate CO 2 remains in zone, and tech transfer. Objectives: 1. Assessment of injections in field. PFT gas tracers are analyzed by GC-ECD to

468

Project Homepage  

NLE Websites -- All DOE Office Websites (Extended Search)

Middle School Home Energy Audit Middle School Home Energy Audit Project Homepage NTEP Home - Project Homepage - Teacher Homepage - Student Pages Abstract: This set of lessons provides an opportunity for midlevel students to gain a basic understanding of how energy is turned into power, how power is measured using a meter, the costs of those units and the eventual reduction of energy consumption and cost to the consumer. Introduction to Research: By conducting energy audits of their own homes and completing exercises to gain baclground information, students begin to see the importance of energy in their daily lives. By using the Internet as a research tool, students gain develop research skills as they gain knowledge for their project. They use e-mail to collaborate with energy experts and share results with other

469

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Title: DEVELOPING A Title: DEVELOPING A COMPREHENSIVE RISK ASSESMENT FRAMEWORK FOR GEOLOGICAL STORAGE OF CO2 Ian Duncan University of Texas U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline 1. Benefit to the Program 2. Goals and Objectives 3. Technical Status Project 4. Accomplishments to Date 5. Summary 3 Benefit to the Program The research project is developing a comprehensive understanding of the programmatic (business), and technical risks associated with CCS particularly the likelihood of leakage and its potential consequences. This contributes to the Carbon Storage Program's effort of ensuring 99 percent CO

470

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Storage R&D Project Review Meeting Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Acknowledgments Dave Harris, Kentucky Geological Survey Dave Barnes, Western Michigan University John Rupp, Indiana Geological Survey Scott Marsteller, Schlumberger Carbon Services John McBride, Brigham Young University * Project is funded by the U.S. Department of Energy through the National Energy Technology Laboratory (NETL) and by a cost share agreement with the Illinois Department of Commerce and Economic Opportunity, Office of Coal Development through the Illinois Clean Coal Institute * ConocoPhillips: in-kind match * Western Kentucky Carbon Storage Foundation: matching funding * SeisRes 2020, Houston: VSP acquisition and processing

471

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

to Analyze Spatial and Temporal to Analyze Spatial and Temporal Heterogeneities in Reservoir and Seal Petrology, Mineralogy, and Geochemistry: Implications for CO 2 Sequestration Prediction, Simulation, and Monitoring Project Number DE-FE0001852 Dr. Brenda B. Bowen Purdue University (now at the University of Utah) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Introduction to the project * Tasks * Student training * Student research successes * Lessons learned and future plans 3 Benefit to the Program * Addresses Carbon Storage Program major goals: - Develop technologies that will support industries' ability to predict CO

472

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Results from Simulation Project Results from Simulation Framework for Regional Geologic CO 2 Storage Infrastructure along Arches Province of Midwest United States DOE Award No. DE-FE0001034 Ohio Dept. of Dev. Grant CDO/D-10-03 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting August 21-23, 2012 Joel Sminchak and Neeraj Gupta Battelle Energy Systems sminchak@battelle.org, 614-424-7392 gupta@battelle.org, 614-424-3820 BUSINESS SENSITIVE 2 Presentation Outline 1. Technical Status 2. Background (CO 2 Sources, Geologic Setting) 3. Injection Well history 4. Geocellular Model Development 5. Geological Data (Geological dataset, Geostatistics) 6. Geocellular porosity/permeability model development 7. Pipeline Routing Analysis

473

Research projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Yuan » Research projects Yuan » Research projects Research projects Research Interests Scientific computing, domain decomposition methods Linear solvers for sparse matrices Computational plasma physics Grid generation techniques GPU computing Current Research PDSLin: A hybrid linear solver for large-scale highly-indefinite linear systems The Parallel Domain decomposition Schur complement based Linear solver (PDSLin), which implements a hybrid (direct and iterative) linear solver based on a non-overlapping domain decomposition technique called chur complement method, and it has two levels of parallelism: a) to solve independent subdomains in parallel and b) to apply multiple processors per subdomain. In such a framework, load imbalance and excessive communication lead to the performance bottlenecks, and several techniques are developed

474

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

SECARB Anthropogenic Test: SECARB Anthropogenic Test: CO 2 Capture/Transportation/Storage Project # DE-FC26-05NT42590 Jerry Hill, Southern Sates Energy Board Richard A. Esposito, Southern Company U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - CO 2 Capture - CO 2 Transportation - CO 2 Storage * Accomplishments to Date * Organization Chart * Gantt Chart * Bibliography * Summary Benefit to the Program 1. Predict storage capacities within +/- 30% * Conducted high resolution reservoir characterization of the Paluxy saline formation key

475

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigation of the CO Investigation of the CO 2 Sequestration in Depleted Shale Gas Formations Project Number DE-FE-0004731 Jennifer Wilcox, Tony Kovscek, Mark Zoback Stanford University, School of Earth Sciences U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Outline * Project Benefits * Technical Status * Imaging at mm- to micron-scales using CT - Permeability measurements and application of the Klinkenberg effect - Molecular Dynamics simulations for permeability and viscosity estimates * Accomplishments to Date * Summary Stanford University 3 Benefit to the Program * Carbon Storage Program major goals

476

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Fidelity Computational Analysis of Fidelity Computational Analysis of CO2 Trappings at Pore-scales Project Number: DE-FE0002407 Vinod Kumar (vkumar@utep.edu) & Paul Delgado (pmdelgado2@utep.edu) University of Texas at El Paso U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 Collaborators: Dr. C. Harris (Shell Oil Company/Imperial College), Dr. G. Bromhal (NETL), Dr. M. Ferer (WVU/NETL), Dr. D. Crandall (NETL-Ctr), and Dr. D. McIntyre (NETL). 2 Presentation Outline * Benefit to the Program * Project Overview * Technical Status - Pore-network modeling - Conductance derivation for irregular geom. - Pore-to-CFD Computations

477

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Number (DE-FE0002056) W. Lynn Watney & Jason Rush (Joint PIs) Kansas Geological Survey Lawrence, KS 66047 U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits to the Program * Project Overview * Technical Status * Accomplishments to Date * Summary KANSAS STATE UNIVERSITY Bittersweet Energy Inc. Partners FE0002056 Devilbiss Coring Service Basic Energy Services Wellington Field Operator Industrial and Electrical Power Sources of CO 2 Southwest Kansas CO 2 -EOR Initiative Industry Partners (modeling 4 Chester/Morrowan oil fields to make CO2 ready) +drilling and seismic contractors TBN

478

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

MVA Tools MVA Tools Sam Clegg, Kristy Nowak-Lovato, Ron Martinez, Julianna Fessenden, Thom Rahn, & Lianjie Huang Los Alamos National Laboratory U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 2 Presentation Outline * Benefit to the Program * Project Overview - Goals and Objectives * Technical Status * Accomplishments to Date * Summary * Appendix - Organization Chart - Bibliography 3 Project Overview: Goals and Objectives * Surface MVA - Frequency Modulated Spectroscopy - Quantitatively identify CO2, H2S and CH4 seepage from geologic sequestration sites - Distinguish anthropogenic CO2 from natural CO2 emissions * CO2 carbon stable isotope measurements

479

Line Management Understanding of QA and Oversight  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Right Quadrant: Quality Assurance Right Quadrant: Quality Assurance Point of Contact: Sandra Waisley * Issues: Users will provide current or on-going QA issues of concern that impact work being done correctly, timely, and safely. Input could be from recent assessments, trends, Performance Metrics, number of open action items, recurring issues, etc. Example: Issue #1: Training database was not updated for a 60 day period following termination of training coordinator * Risks: Users will identify risks that impact the project (can be related to "issues" [above] or any other FPD identified risk) being done correctly, timely, and safely. Example: Risk #1: Unqualified personnel may have performed hazardous work unsafely or incorrectly during this period * Planned Actions: Users will provide planned actions to address QA issues or

480

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

DE-FE0002225: DE-FE0002225: Actualistic and geochemical modeling of reservoir rock, CO 2 and formation fluid interaction, Citronelle oil field, Alabama West Virginia University & University of Alabama Presenter: Dr. Amy Weislogel (WVU) Co-PI: Dr. Rona Donahoe (UA) U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 2 Presentation Outline * Benefits * Overview & Project Map * Reservoir Geochemical Characterization * Formation Fluid Geochemistry * Geochemical Modeling * Summary 3 Benefit to the Program * Develop technologies that will support industries'

Note: This page contains sample records for the topic "line item projects" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Building the Infrastructure for CO 2 Storage August 21-23, 2012 BROWN 2 Presentation Outline * Benefits & overview of deriving acrylates from coupling carbon dioxide and ethylene * Chemical catalysis approach: background and battles left to fight * Experimental assessment of the viability of thermochemical acrylate production * Perspectives for the future BROWN 3 Benefit to the Program * This project identifies the critical catalyst features necessary to promote carbon dioxide coupling with ethylene to acrylate at molybdenum catalysts. This research demonstrates the viability of acrylate production

482

Project Title  

NLE Websites -- All DOE Office Websites (Extended Search)

3 3 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool to Improve CO2 Sequestration DE FE0004542 Larry Murdoch, Clemson University Stephen Moysey, Clemson University Leonid Germanovich, Georgia Tech Cem Ozan, Baker Hughes Sihyun Kim, Georgia Tech Glenn Skawski, Clemson University Alex Hanna, Clemson University Johnathan Ebenhack, Clemson University Josh Smith, Clemson University U.S. Department of Energy National Energy Technology Laboratory Carbon Storage R&D Project Review Meeting Developing the Technologies and Infrastructure for CCS August 20-22, 2013 Proof-of-Feasibility of Using Wellbore Deformation as a Diagnostic Tool, Larry Murdoch Project Review Meeting, 23 Aug. 2013 2 Presentation Outline * Preliminaries

483

Hallmark Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Project Commercialization of the Secure SCADA Communications Protocol, a cryptographic security solution for device-to-device communication Increased connectivity and automation in the control systems that manage the nation's energy infrastructure have improved system functionality, but left systems more vulnerable to cyber attack. Intruders could severely disrupt control system operation by sending fabricated information or commands to control system devices. To ensure message integrity, supervisory control and data acquisition (SCADA) systems require a method to validate device-to- device communication and verify that information has come from a trusted source and not been altered in transit. The Secure SCADA Communications Protocol (SSCP) provides message

48