Powered by Deep Web Technologies
Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

The effect of transmission-line corridor edge and successional stage on the animal community. Final report  

SciTech Connect

Using breeding success as a criterion of habitat quality, this report evaluates the suitability of 2 transmission-line corridor habitat types, grassland and shrubland, for open-nesting passerines in western Maryland. The main objectives were to investigate the patterns of fledging success and spatial distribution of nests in each habitat type in relation to the corridor, corridor-forest edge, and the adjacent forest, and to quantify important features of the microhabitat of corridor and forest nests that may influence nest success. The second part of this report examines the effect of a transmission-line corridor on forest animal communities by monitoring their activity patterns in the corridor. Animal activity patterns are compared between a transmission-line corridor that was maintained in shrubby vegetation by selective spraying of herbicides and one that was managed for herbaceous vegetation by mowing with rotary mowers.

Gates, D.J.E.

1982-01-01T23:59:59.000Z

2

Monitoring voltage collapse margin with synchrophasors across transmission corridors with multiple lines and multiple contingencies  

E-Print Network (OSTI)

We use synchrophasor measurements of the complex voltage and current at both ends of multiple transmission lines that connect areas of a power system to monitor the online voltage collapse margin. A new reduction is used to reduce the multiple transmission lines to a single line equivalent and determine how to combine the synchrophasor measurements. Generator reactive power limits can be accommodated. The results show that this methodology can capture the effect of multiple contingencies inside the transmission corridors, giving awareness to the operators about the severity of contingencies with respect to voltage stability.

Ramirez, Lina

2014-01-01T23:59:59.000Z

3

Hybrid Transmission Corridor study  

SciTech Connect

Hybrid Transmission Corridors are areas where High Voltage Alternating Current (HVAC) transmission lines and High Voltage Direct Current (HVDC) transmission lines exist in close proximity of each other. Because of the acceptance of HVDC as a means of transporting electric power over long distances and the difficulties associated with obtaining new right-of-ways, HVDC lines may have to share the same transmission corridor with HVAC lines. The interactions between conductors energized with different types of voltages causes changes in the electrical stresses applied to the conductors and insulators. As a result, corona phenomena, field effects and insulation performance can be affected. This report presents the results of an investigation of the HVAC-HVDC interaction and its effect on corona and AC and DC electric field phenomena. The method of investigation was based on calculation methods developed at the EPRI High Voltage Transmission Research Center (HVTRC) and supported by the results of full and reduced-scale line tests. Also, a survey of existing hybrid corridors is given along with the results of measurements made at one of those corridors. A number of examples in which an existing AC corridor may be transformed into a hybrid corridor are discussed. The main result of the research is an analytical/empirical model for predicting the electrical/environmental performance of hybrid corridors, a definition of ACDC interaction and a set of criteria for specifying when the interaction becomes significant, and a set of design rules.

Clairmont, B.A.; Johnson, G.B.; Zaffanella, L.E. (General Electric Co., Lenox, MA (United States))

1992-06-01T23:59:59.000Z

4

Nest predation, predator abundance, and avian diversity in transmission line corridors and adjacent habitats in east central Texas  

E-Print Network (OSTI)

corridors may have differential effects on wildlife communities in adjacent vegetation types in a heterogeneous landscape. I evaluated the effects of ROW corridors on avian and nest predator communities in forests and pastures in east central Texas in 1998...

Hubbard, Tani Ann

2000-01-01T23:59:59.000Z

5

Watering the Sun Corridor  

E-Print Network (OSTI)

Watering the Sun Corridor Managing Choices in Arizona's Megapolitan Area #12;#12;Managing ChoicesSored by Printing generously provided by SRP. Watering the Sun Corridor Tom Buschatzke, City of Phoenix Peter Culp i C y | 5 Introduction............................................7 I. The Sun Corridor

Hall, Sharon J.

6

BPA, Transmission, I-5 Corridor Reinforcement Project, August...  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Administration has refined the potential transmission line route segments and substation sites for the proposed I-5 Corridor Reinforcement Project. The refinements are...

7

BPA, Transmission, I-5 Corridor Reinforcement Project Update...  

NLE Websites -- All DOE Office Websites (Extended Search)

environmental impact statement (EIS) for our proposed I-5 Corridor Reinforcement Project. BPA is proposing to build a 500-kilovolt transmission line to reinforce the high-voltage...

8

BPA, Transmission, I-5 Corridor Project, data by segments and...  

NLE Websites -- All DOE Office Websites (Extended Search)

alternatives for new transmission system facilities, including the new transmission line and substations proposed for the I-5 Corridor Reinforcement Project. Foremost is...

9

Proposed Energy Transport Corridors: West-wide energy corridor programmatic  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Transport Corridors: West-wide energy corridor Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Map of the area covered by a programmatic environmental impact statement (PEIS), "Designation of Energy Corridors on Federal Land in the 11 Western States" (DOE/EIS-0386) to address the environmental impacts from the proposed action and the range of reasonable alternatives. The proposed action calls for designating more than 6,000 miles of energy transport corridors across the West. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. More Documents & Publications

10

Intercontinental cross-linking of power supply - calculating an optimal power line corridor from North Africa to Central Europe  

Science Journals Connector (OSTI)

An oversupply of solar radiation in Northern Africa as well as high energy consumption in the economic centers of Central ... power lines. By this means only, the energy can be economically transferred from the s...

Katrin Walter; Stephan Bosch

2013-07-01T23:59:59.000Z

11

The opportunistic green : building on Toronto's utility corridor  

E-Print Network (OSTI)

The Green Line or hydro corridors of Toronto are sprawling lengths of continuous, mostly vacant land used for the primary purpose of transmitting electricity. They are unusual terrain, physically sparse but culturally ...

Rahimi, Kamyar

2014-01-01T23:59:59.000Z

12

Energy Corridors on Federal Lands  

Energy.gov (U.S. Department of Energy (DOE))

To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States.

13

Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council  

SciTech Connect

This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to analyze the proposed energy corridors in the WECC report in five topic areas: ? Federal land jurisdiction, ? Existing Section 368 corridors, ? Existing transmission lines, ? Previously studied corridor locations, and ? Protected areas. Analysis methods are explained and tables and maps are provided to describe the results of the analyses in all five topic areas. WECC used a rational approach to connecting the hubs it identified, although there may be opportunities for adapting some of the proposed WECC routes to previously designated Section 368 corridors, for example: ? The WECC proposed energy corridors are in fact centerlines of proposed routes connecting hubs of various descriptions related to electric energy transmission. Although the centerlines were sited to avoid sensitive areas, infrastructure proposed within actual pathways or corridors defined by the centerlines would sometimes affect lands where such development would not normally be allowed, such as National Parks and Monuments, National Wildlife Refuges, and Wilderness Areas. ? Many WECC proposed energy corridors are sited along centerlines of existing roads, including Interstate Highways, where in some cases additional width to accommodate energy transmission infrastructure may not be available. Examples include the WECC Proposed Corridor along Interstate 70 through Glenwood Canyon in Colorado, and along U.S. Highway 89 across Glen Canyon Dam in Arizona. ? Several WECC proposed energy corridors are parallel to designated Section 368 corridors that have already cleared the preliminary steps to right-of-way approval. In many of these cases, the WECC hub connection objectives can be met more efficiently by routing on the designated Section 368 corridors.

Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

2014-02-24T23:59:59.000Z

14

Milford Wind Corridor Phase II | Open Energy Information  

Open Energy Info (EERE)

Milford Wind Corridor Phase II Milford Wind Corridor Phase II Facility Milford Wind Corridor Phase II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Millard and Beaver County UT Coordinates 38.645608°, -112.878027° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.645608,"lon":-112.878027,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

15

Geologic selection methodology for transportation corridor routing  

E-Print Network (OSTI)

Corridor Evaluation Area. 3 Location of Counties Studied in Corridor Project 4 Climatic Zones of Texas . 5 State of Texas Average Annual Precipitation Values, in Inches, . . . 6 State of Texas Average Annual Runoff Values, in Inches... Borehole 6: Waco City. . 36 Borehole 7: Bexar County . 37 Borehole 8: Bexar County 38 Route Alternatives in Corridor Area. 39 Cost Matrix for Project Area . . 40 Risk Matrix for Project Area . . 41 Geo-Economic Construction Costs. . . 85 . . 88 100...

Shultz, Karin Wilson

2012-06-07T23:59:59.000Z

16

River Corridor Closure Project Partnering Performance Agreement...  

Office of Environmental Management (EM)

- March 2009 Voluntary Protection Program Onsite Review, River Corridor Closure Project - June 2012 Indoctrinating Subcontractors into the DOE Safety Culture and Expectations...

17

Agencies Publish Final Environmental Impact Statement On Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement On Energy Final Environmental Impact Statement On Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. Agencies Publish Final Environmental Impact Statement On Energy Corridor Designation in the West More Documents & Publications Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States, November 8, 2007 Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007.

18

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations. The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). DOE Affirms National Interest Electric Transmission Corridor Designations More Documents & Publications DOE Designates Southwest Area and Mid-Atlantic Area National Interest

19

Lake Worth Corridor, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Worth Corridor, Florida: Energy Resources Worth Corridor, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 26.6184015°, -80.1011539° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":26.6184015,"lon":-80.1011539,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

20

West Vero Corridor, Florida: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Corridor, Florida: Energy Resources Corridor, Florida: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 27.6394769°, -80.4817201° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":27.6394769,"lon":-80.4817201,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Milford Wind Corridor Phase I (GE Energy) | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Milford Wind Corridor Phase I (GE Energy) Jump to: navigation, search Name Milford Wind Corridor Phase I (GE Energy) Facility Milford Wind Corridor Phase I (GE Energy) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Milford UT Coordinates 38.52227°, -112.935262° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.52227,"lon":-112.935262,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

22

Dulles Corridor Metrorail Project Extension to Wiehle Avenue  

E-Print Network (OSTI)

Airports Authority (MWAA) on February 4, 2010 to conduct a monthly progress meeting for work performed in January 2010 and attended various project meetings on the afternoon of February 4, 2010. As of February 15, Hill is providing a full-time, on-site PMOC presence at the Dulles Corridor project office. The anticipated schedule of PMOC monthly progress meetings is that they will occur during the last week of each month. 1. Project Description MWAA, in cooperation with the Washington Metropolitan Area Transit Authority (WMATA), proposes to implement a 23.1-mile rapid transit system in the Dulles Corridor of Northern Virginia. The proposed corridor follows the alignment of the Dulles International Airport Access Highway (DIAAH) and the Dulles Toll Road within Fairfax County, and the Dulles Greenway, a private toll road in Loudoun County. The Project (Initial Operating Segment) undertakes the construction of the initial 11.7-miles of the rail project from the existing Metrorail Orange Line just east of the West Falls Church (WFC) Station to a station to be constructed at Wiehle Avenue with a total project cost of $3.142 billion. Included in the Project are five new stations (Tysons East, Tysons Central 123, Tysons Central 7, Tysons West and Wiehle Avenue),

unknown authors

2010-01-01T23:59:59.000Z

23

Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Pennsylvania's Ethanol Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons to someone by E-mail Share Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Facebook Tweet about Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Twitter Bookmark Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Google Bookmark Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Delicious Rank Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Digg Find More places to share Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on

24

Alternative Fuels Data Center: Provision for Alternative Fuels Corridor  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Provision for Provision for Alternative Fuels Corridor Pilot Projects to someone by E-mail Share Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Facebook Tweet about Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Twitter Bookmark Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Google Bookmark Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Delicious Rank Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on Digg Find More places to share Alternative Fuels Data Center: Provision for Alternative Fuels Corridor Pilot Projects on AddThis.com... More in this section... Federal

25

Corridor Length and Patch Colonization by a Butterfly, Junonia coenia  

SciTech Connect

Study hypothesized that corridors increase patch colonization by Junonia coenia regardless of insects initial distance from patch, as the butterfly is known to move between patches preferentially through corridors. Neither corridor nor distance had significant effect on patch colonization, but significant interaction between presence or absence of corridors and distance. One critical factor is interpatch distance which may determine the relative effectiveness of corridors and other landscape configurations.

Haddad, N.

1999-01-22T23:59:59.000Z

26

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES  

Energy.gov (U.S. Department of Energy (DOE))

Designed to promote energy efficiency in buildings in Phoenix, Arizona’s 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in...

27

BPA releases I-5 Corridor Reinforcement Project  

NLE Websites -- All DOE Office Websites (Extended Search)

RELEASE Tuesday, Nov. 13, 2012 CONTACT: Doug Johnson, 503-230-5840 or 503-230-5131 BPA releases I-5 Corridor Reinforcement Project Draft EIS and preferred alternative...

28

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36: I-5 Corridor Reinforcement Project, Multnomah County, 36: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County, Oregon and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from a new 500-kV substation near Castle Rock, Wash., to a new 500-kV substation near Troutdale, Ore. After initially identifying a large number of route segments, BPA combined those segments into four action alternatives (each with options): West, Central, East, and Crossover. The action alternatives and the No Action Alternative are analyzed in the draft EIS. The alternatives vary in length and include both existing and new

29

BPA, Transmission, I-5 Corridor Reinforcement Project, meeting...  

NLE Websites -- All DOE Office Websites (Extended Search)

BPA I-5 Corridor Reinforcement Project - AugustSeptember 2010 Open Houses Page 1 of 4 Meeting Summary and Survey Results BPA I-5 Corridor Reinforcement Project - AugustSeptember...

30

Tucson Electric Power Company Sahuarita-Nogales Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TEP Sahuarita-Nogales Transmission Line Final EIS TEP Sahuarita-Nogales Transmission Line Final EIS 2-4 Figure 2.1-1. Close-up of Alternative Study Corridors Near Sahuarita and Green Valley. Chapter 2- Proposed Action and Alternatives 2-5 Figure 2.1-2. Close-up of Alternative Study Corridors Near Amado. TEP Sahuarita-Nogales Transmission Line Final EIS 2-6 Figure 2.1-3. Close-up of Alternative Study Corridors Near Nogales. TEP Sahuarita-Nogales Transmission Line Final EIS 2-8 Figure 2.1-4. Western Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-13 Figure 2.1-5. Central Corridor on the Coronado National Forest. Chapter 2-Proposed Action and Alternatives 2-15 Figure 2.1-6. Crossover Corridor on the Coronado National Forest. TEP Sahuarita-Nogales Transmission Line Final EIS

31

DOE/EIS-0285-SA-139: Supplement Analysis for the Transmission System Vegetation Management Program FEIS - Little Goose-Lower Granite Corridor Maintenance (4/3/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9-Little Goose-Lower Granite Corridor Maintenance 9-Little Goose-Lower Granite Corridor Maintenance William Erickson Natural Resource Specialist - TFP/Walla Walla Proposed Action: Vegetation Management for the Little Goose-Lower Granite #1 and #2 Transmission Line Corridor from Towers 4/3 to 8/1. The right-of-way has an easement width of 258 feet and contains two 500kV Single Circuit Transmission Lines. The proposed work will be accomplished in the indicated sections of the transmission line corridor as referenced in the attached checklist. Location: The subject right-of-way is located in Columbia County, WA., being in the Walla Walla Region. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: The work will be accomplished by an Integrated Vegetation Management approach using a combination of manual, mechanical, herbicides and biological

32

DOE Affirms National Interest Electric Transmission Corridor Designations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Affirms National Interest Electric Transmission Corridor Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint. The designation of national corridors was made in accordance with the Energy Policy Act of 2005 (EPAct). In affirming the National Corridor designations today, DOE dismissed as being without merit challenges raised by the applicants for rehearing, citing extensive data analysis conducted in its 2006 National Interest Electric Transmission

33

Interstate Clean Transportation Corridor Project Under Way  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

rucks that travel in the western rucks that travel in the western United States will soon be able to operate clean-burning alternative fuel vehicles (AFVs) along the Interstate Clean Transpor- tation Corridor (ICTC). The ICTC project is the first effort to develop clean transportation corridors to connect Los Angeles, San Bernar- dino, the San Joaquin Valley, Sacra- mento/San Francisco, Salt Lake City, Reno, and Las Vegas along routes 1-15, 1-80, and 1-5/CA-99. The ICTC team, headed by California- based Gladstein and Associates, plans to have commitments by early 1997 for 10 to 15 fueling sites located approximately 180 miles apart. These sites will serve 250 new heavy-duty AFVs and 500 local delivery vehicles. Their fuels will displace 4.7 million gallons of petroleum and mitigate more than

34

Energy Corridors on Federal Lands | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Corridors on Federal Lands Energy Corridors on Federal Lands Energy Corridors on Federal Lands In many areas of the United States, the infrastructure required to deliver energy has not always kept pace with growth in demand. To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States. Energy corridors would help address growing energy demand by facilitating future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities, while also protecting the environment. As the agency-preferred siting locations, the energy transport corridors will provide industry and the public with

35

BPA Transmission, I-5 Corridor Reinforcement Project, letter...  

NLE Websites -- All DOE Office Websites (Extended Search)

near Castle Rock, Washington in Cowlitz County, to a new substation near BPA's Troutdale Substation, Troutdale, Oregon in Multnomah County. BPA is proposing the I-5 Corridor...

36

Cleaning Up the Hanford River Corridor and Improving Site Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition *...

37

Department of Energy Awards Hanford River Corridor Contract To...  

Energy Savers (EERE)

Corridor." Media contact: Mike Waldron, 202586-4940 Addthis Related Articles Hanford Landfill Reaches 15 Million Tons Disposed - Waste Disposal Mark Shows Success Cleaning Up...

38

Strategy for the Identification of an INL Comprehensive Utility Corridor  

SciTech Connect

This report documents the strategy developed to identify a comprehensive utility corridor (CUC) on the Idaho National Laboratory (INL) Site. The strategy established the process for which the Campus Development Office will evaluate land management issues. It is a process that uses geographical information system geospatial technology to layer critical INL mission information in a way that thorough evaluations can be conducted and strategies developed. The objective of the CUC Project was to develop a process that could be implemented to identify potential utility corridor options for consideration. The process had to take into account all the missions occurring on the INL and other land-related issues. The process for developing a CUC strategy consists of the following four basic elements using geographical information system capabilities: 1. Development of an INL base layer map; this base layer map geospatially references all stationary geographical features on INL and sitewide information. 2. Development of current and future mission land-use need maps; this involved working with each directorate to identify current mission land use needs and future land use needs that project 30 years into the future. 3. Development of restricted and potential constraint maps; this included geospatially mapping areas such as wells, contaminated areas, firing ranges, cultural areas, ecological areas, hunting areas, easement, and grazing areas. 4. Development of state highway and power line rights of way map; this included geospatially mapping rights-of-way along existing state highways and power lines running through the INL that support INL operations. It was determined after completing and evaluating the geospatial information that the area with the least impact to INL missions was around the perimeter of the INL Site. Option 1, in this document, identifies this perimeter; however, it does not mean the entire perimeter is viable. Many places along the perimeter corridor cannot be used or are not economically viable. Specific detailed studies will need to be conducted on a case-by-case basis to clearly identify which sections along the perimeter can and cannot be used. Option 2, in this document, identifies areas along existing highways that could be a viable option. However, discussions would have to take place with the State of Idaho to use their easement as part of the corridor and mission impact would need to be evaluated if a specific request was made to the Department of Energy, Idaho Operations Office. Option 3, in this document, is a combination of Options 1 and 2. This option provides the most flexibility to minimize impacts to INL missions. As with the other two options, discussions and agreements with the State of Idaho would be needed and any specific route would need to be thoroughly evaluated for impact, implementation, and operability beyond just a strategy.

John Reisenauer

2011-05-01T23:59:59.000Z

39

DOE Issues Two Draft National Interest Electric Transmission Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Two Draft National Interest Electric Transmission Issues Two Draft National Interest Electric Transmission Corridor Designations DOE Issues Two Draft National Interest Electric Transmission Corridor Designations April 26, 2007 - 10:58am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE's National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors. "These draft designations set us on the path to modernize our constrained and congested electric power infrastructure. They are a crucial step toward realizing President Bush's goal of a modern, more efficient electric

40

Department of Energy Awards Hanford River Corridor Contract To Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford River Corridor Contract To Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor at the Department of Energy's Hanford Reservation in the state of Washington. The five-member team includes the Washington Group International Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles along the outer edge of the Hanford Site. The contract calls for cleaning up and

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

An Inside Look at River Corridor | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

An Inside Look at River Corridor An Inside Look at River Corridor An Inside Look at River Corridor July 16, 2012 - 1:04pm Addthis "River Corridor" provides viewers with a look at the cleanup of hundreds of contaminated buildings and more than one thousand areas where soil was contaminated along the 50-mile stretch of the Columbia River that flows through the Hanford Site in southeast Washington State. Amanda Scott Amanda Scott Former Managing Editor, Energy.gov In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast Washington State. This video provides you with an insiders look at the cleanup of contaminated buildings and soil. Watch the video above to get a look inside the Energy

42

Wabash River Heritage Corridor (Indiana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) Wabash River Heritage Corridor (Indiana) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor Industrial Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info Start Date 1991 State Indiana Program Type Siting and Permitting Provider Wabash River Heritage Corridor Commission The Wabash River Heritage Corridor, consisting of the Wabash River, the Little River, and the portage between the Little River and the Maumee

43

Department of Energy Awards Hanford River Corridor Contract To Washington  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Awards Hanford River Corridor Contract To Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis WASHINGTON, DC - U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor at the Department of Energy's Hanford Reservation in the state of Washington. The five-member team includes the Washington Group International Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles along the outer edge of the Hanford Site. The contract calls for cleaning up and

44

Digging Begins at Hazardous Hanford Burial Ground - River Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Digging Begins at Hazardous Hanford Burial Ground - River Corridor Digging Begins at Hazardous Hanford Burial Ground - River Corridor Contractor Spent Two Years Preparing to Remediate 618-10 Digging Begins at Hazardous Hanford Burial Ground - River Corridor Contractor Spent Two Years Preparing to Remediate 618-10 August 3, 2011 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE Cameron.Hardy@rl.doe.gov 509-376-5365 Todd Nelson, Washington Closure media@wch-rcc.com 509-372-9097 RICHLAND, WASH. - After careful preparation and characterization, the Department of Energy's (DOE) River Corridor contractor, Washington Closure Hanford, has begun remediation of one of the most hazardous burial grounds tackled to date on the Hanford Site's River Corridor. The $57 million American Recovery and Reinvestment Act project began with nearly two years of preparation and characterization before reaching their

45

Corridors and some ecological and evolutionary consequences of connectivity.  

SciTech Connect

Abstract - By connecting disjunct patches, corridors may offset the effects of fragmentation by promoting gene flow and population persistence. However, the ultimate effect of corridors on a focal species may hinge upon two considerations: how corridors may affect ecological interactions that impinge upon that species, and how corridors might affect the fixation of novel alleles that ultimately determine fitness and persistence. Using an experimental landscape, I show that corridor-mediated changes in patch shape change seed predation in connected and unconnected patches, and shift the behavior, abundance, and distribution of seed predators. Rodent seed predators removed more seeds in connected patches, arthropod seed predators removed more seeds in rectangular patches, and avian seed predation did not differ due to patch type. Rodent foraging was greater in the interior of connected patches because changes in patch shape influenced risk perceived by rodents while foraging. Ant communities were also affected by changes in patch shape caused by corridors, rather than corridor effects per se. The distribution and abundance of ants differed among edge-rich areas (corridors and wings), edges, and the patch interior. In rectangular patches, fire ants (Solenopsis spp.) had negative impacts on other ant species. By changing the activity of rodents, and the composition of ant communities, corridors may have important impacts on seeds. Bird-dispersed seeds may benefit from increased dispersal among connected patches, but connected patches also have greater predation risk. Using a simulation model, I demonstrate that gene flow between a stable population and a population that experiences local extinction or a reduction in size (e.g. due to natural or anthropogenic disturbance) can dramatically affect fixation of alleles in the stable population. Alone or in concert, frequent disturbance, high rates of movement, and low habitat quality make it more likely that connectivity-mediated fixation will promote fixation of harmful alleles and reduce fixation of beneficial alleles.

Orrock, John L

2004-07-01T23:59:59.000Z

46

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement on Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of the Interior's Bureau of Land Management and the U.S. Departments of Energy, Agriculture, and Defense (the Agencies) prepared the Final PEIS as part of their work to implement Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines, as well as electricity

47

Agencies Publish Final Environmental Impact Statement on Energy Corridor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Impact Statement on Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 2:07pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of the Interior's Bureau of Land Management and the U.S. Departments of Energy, Agriculture, and Defense (the Agencies) prepared the Final PEIS as part of their work to implement Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines, as well as electricity

48

River Corridor Baseline Risk Assessment (RCBRA) Human Health...  

NLE Websites -- All DOE Office Websites (Extended Search)

by end of year Status of River Corridor Risk Assessments 2 RCBRA will be used in CERCLA Remedial InvestigationFeasibility Study (RIFS) * RCBRA provides "basis for action" to...

49

DEVELOPING CORRIDOR-LEVEL TRUCK TRAVEL TIME ESTIMATES AND OTHER  

E-Print Network (OSTI)

by comparing estimated travel times during a winter weather-induced delay. The analysis showed that corridor given on increased sensor spacing and filter improvement. Finally, potential performance metrics

Bertini, Robert L.

50

I-65 Clean Corridor: Fall Drive Overview and Media Summary  

Energy.gov (U.S. Department of Energy (DOE))

At the May 1, 2008 joint quarterly Web conference of DOE's Biomass and Clean Cities programs, Julie Howe (Indiana Office of Energy & Defense Development) described the I-65 Corridor Project.

51

EIS-0250-S2: Supplemental EIS for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada- Nevada Rail Transportation Corridor  

Energy.gov (U.S. Department of Energy (DOE))

This SEIS is to evaluate the potential environmental impacts of constructing and operating a railroad for shipments of spent nuclear fuel and high-level radioactive waste from an existing rail line in Nevada to a geologic repository at Yucca Mountain. The purpose of the evaluation is to assist the Department in deciding whether to construct and operate a railroad in Nevada, and if so, in which corridor and along which specific alignment within the selected corridor.

52

The Canary Eddy Corridor: A major pathway for long-lived eddies in the subtropical North Atlantic  

E-Print Network (OSTI)

corridor, whose source is the flow perturbation of the Canary Current and the Trade Winds at the Canary westward- propagating eddy corridors were also detected: two small corridors north and south of the Azores Front; a small zonal corridor located near 31 % oN, south of the island of Madeira; and a small corridor

Dong, Changming "Charles"

53

ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED WITHDRAWAL OF PUBLIC LANDS WITHIN AND SURROUNDING THE CALIENTE RAIL CORRIDOR, NEVADA  

SciTech Connect

The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not to reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.

DOE

2005-12-01T23:59:59.000Z

54

3D Reconstruction of 138 KV Power-lines from Airborne LiDAR Data.  

E-Print Network (OSTI)

??Due to infrequent and imprecise maintenance inspection in power-line corridors, accidents can be caused by interferences, for instance, surrounding trees. Transmission power-line inspection conventionally relies… (more)

Xiang, Qing

2014-01-01T23:59:59.000Z

55

Mechanisms Governing the Persistence and Diurnal Cycle of a Heavy Rainfall Corridor  

Science Journals Connector (OSTI)

Observations and convection-permitting simulations are used to study a 12-day warm-season heavy precipitation corridor over the central U.S. plains and Mississippi River valley regions. Such precipitation corridors, defined by narrow latitudinal ...

Stanley B. Trier; Christopher A. Davis; Richard E. Carbone

2014-11-01T23:59:59.000Z

56

Autonomous Corridor Flight of a UAV Using an RGB-D Camera  

E-Print Network (OSTI)

Autonomous Corridor Flight of a UAV Using an RGB-D Camera System Overview We describe the first application of the novel Kinect RGB-D sensor on a fully autonomous quadrotor UAV. We apply the UAV in an indoor corridor scenario. The position and orientation of the UAV inside the corridor is extracted from

Cremers, Daniel

57

Mixing Fast Trains on Freight Rail Corridors presented by  

E-Print Network (OSTI)

Mixing Fast Trains on Freight Rail Corridors presented by: Minnesota Department of Transportation May 23, 2012 #12;Presentation Outline · State Plans for Fast (Passenger) Trains · Overarching) Suggest picture of CP grain train be inserted here #12;Passenger Rail Development Overarching Principles

Minnesota, University of

58

Central Corridor Light Rail Transit Briefing for Campus Connections  

E-Print Network (OSTI)

impacts in comments to Draft Environmental Impact Statement · Fall/Winter 2007-2008: Met Council enters Impact (EMI) Goals · Preserve the existing environmental quality of the labs ­ DO NO HARM · Const Corridor should realize development opportunities while reducing impact to the urban environment

Thomas, David D.

59

Milford Wind Corridor Phase I (Clipper) Wind Farm | Open Energy Information  

Open Energy Info (EERE)

Clipper) Wind Farm Clipper) Wind Farm Jump to: navigation, search Name Milford Wind Corridor Phase I (Clipper) Wind Farm Facility Milford Wind Corridor Phase I (Clipper) Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner First Wind Developer First Wind Energy Purchaser Southern California Public Power Authority Location Milford UT Coordinates 38.52227°, -112.935262° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.52227,"lon":-112.935262,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

60

2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect

This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

C. T. Lindsey, A. L. Johnson

2010-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect

This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.

West, W. J.; Lucas, J. G.; Gano, K. A.

2011-11-14T23:59:59.000Z

62

Is planning failing? : the impacts of decision making processes on the Green Line Extension  

E-Print Network (OSTI)

Research was conducted on the proposed Green Line Extension, a light rail corridor from Cambridge through Somerville and Medford, Massachusetts. The project is being undertaken by the Massachusetts Executive Office of ...

Ciborowski, Matthew A

2009-01-01T23:59:59.000Z

63

Type B Accident Investigation Board Report on the July 25, 1997, Contract Brush Cutter Injury on the Ashe-Marion #2 500 kV Line  

Energy.gov (U.S. Department of Energy (DOE))

On July 25, 1997, at 1205 hours, a contract hand brush cutter was seriously injured when he felled a tree close to a Bonneville Power Administration energized transmission power line, located within a BPA transmission-line corridor.

64

Voluntary Protection Program Onsite Review, River Corridor Closure Project- June 2012  

Energy.gov (U.S. Department of Energy (DOE))

Evaluation to determine whether River Corridor Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition.

65

Planning Near-Optimal Corridors Amidst , Jur van den Berg2  

E-Print Network (OSTI)

Planning Near-Optimal Corridors Amidst Obstacles Ron Wein1 , Jur van den Berg2 , and Dan Halperin1 and Computing Sciences, Utrecht University berg@cs.uu.nl Abstract. Planning corridors among obstacles has arisen. Wein, J. van den Berg, and D. Halperin We would therefore like to indicate the global direction

van den Berg, Jur

66

GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor |  

Open Energy Info (EERE)

GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor GRR/Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-HI-f - Permit to Cross or Enter the State Energy Corridor 03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Click to View Fullscreen Contact Agencies Hawaii Department of Transportation Harbors Divsion Regulations & Policies Hawaii Revised Statutes Chapter 277 Triggers None specified Click "Edit With Form" above to add content 03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

67

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project  

SciTech Connect

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

2011-11-01T23:59:59.000Z

68

New Egypt with a New Hybrid Skin “A New Hybrid Architecture Vision for the Egyptians‘Development Corridor  

Science Journals Connector (OSTI)

After the 25th of January revolution, Egypt was looking for a national project combines the energies of its young generations and draws a new image for Egypt. The development corridor for Farouk el Baz which aims to provide numerous opportunities for the development of new communities, agriculture, industry, trade and tourism around a 2,000 km strip of the Western Desert, Became one of the current national projects. This development corridor includes the establishment of a superhighway to be built using the highest international standards, 1,200 km in length, from west of Alexandria to the southern border of Egypt, Twelve east-west branches, with the total length of approximately 800 km, to connect the highway to high-density population centers along the way, A railroad for fast transport parallel to the superhighway, A water pipeline from the Toshka Canal to supply freshwater, and An electricity line to supply energy during the early phases of development. So, what would be the architecture of the new Egypt? How to avoid the current mistakes and problems in the existing urban environment? The new hybrid architectural skin is one of the suggested proposals for the new Egypt, and it means designing an eco-friendly, energy efficient Buildings qualified for \\{LEEDs\\} and Energy Star ratings. It also means, using technology and natural materials to create a healthy living urban environment. The research will come out with different scenarios for the new Egypt hybrid architecture and its guidelines.

Samar M. Sheweka

2012-01-01T23:59:59.000Z

69

CX-011689: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Fence Replacement on the Latham Tap Transmission Line Corridor CX(s) Applied: B1.3 Date: 11/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

70

An Analysis of PM and NOx Train Emissions in the Alameda Corridor, CA  

E-Print Network (OSTI)

5. Ballester, F. Air Pollution and Health: An Overview WithAir Pollution and Mortality, Special Report, Health Effectshealth impacts of freight operations in the corridor could be quite extensive. Estimates of air pollution

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2008-01-01T23:59:59.000Z

71

An Analysis of PM and NOx Train Emissions in the Alameda Corridor, CA  

E-Print Network (OSTI)

Authority. Number of Trains Running on the Alameda Corridor.An Analysis of PM and NO x Train Emissions in the Alamedaefficient than trucks, trains contribute heavily to regional

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2008-01-01T23:59:59.000Z

72

I-65, America's First BioFuels Corridor: Timeline and Map  

Energy.gov (U.S. Department of Energy (DOE))

At the May 1, 2008 joint quarterly Web conference of DOE's Biomass and Clean Cities programs, Julie Howe (Indiana Office of Energy & Defense Development) described the I-65 Corridor Project.

73

Feasibility of an Aeronautical Mobile Ad Hoc Network Over the North Atlantic Corridor  

E-Print Network (OSTI)

Aerospace Center (DLR), Munich, Germany Email: {Daniel attractive scenario, the North Atlantic Corridor, and use realistic flight data to extract statistics about. INTRODUCTION Today's civil aviation airliners are typically equipped with a set of data communications

Schindelhauer, Christian

74

Workers Demolish Reactor Support Facility as Part of River Corridor Contract  

Energy.gov (U.S. Department of Energy (DOE))

RICHLAND, Wash. – EM’s Richland Operations Office and cleanup contractor Washington Closure Hanford recently completed the cleanout and demolition of the last reactor support facility as part of the River Corridor Closure Contract.

75

Creating sustainable air rights development over highway corridors : lessons from the Massachusetts Turnpike in Boston  

E-Print Network (OSTI)

Research and practice have shown that air rights development over highway corridors in America's cities is not only feasible, but desirable. As planners, policy makers and consumers attempt to curb the sprawling development ...

Campbell, Bonnie E., 1977-

2004-01-01T23:59:59.000Z

76

River Corridor Project Workplace Air Monitoring Technical Basis  

SciTech Connect

This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization.

MANTOOTH, D.S.

2001-01-17T23:59:59.000Z

77

Public Technical Conference on DOE Congestion Study and Criteria for Designation of National Interest Electric Transmission Corridors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Conference Technical Conference DOE Congestion Study and Criteria Designation of National Interest Electric Transmission Corridors March 29, 2006 Comments of Edward D. Tatum, Jr. Old Dominion Electric Cooperative Constraint Area and Corridor Designation * Corridors need to be "just right" * Too broad a designation could frustrate Congress' intent to facilitate licensing * Identify specific facilities rather than a family of alternatives - Too many; too long - Recognize impact on existing facilities Constraint Area and Corridor Designation * Existing infrastructure points with generalized paths between * Need "off ramps" * Opportunity to upgrade existing facilities or utilize existing ROW * Need to deliver into congested area * Provide States necessary opportunity for final

78

2012 SG Peer Review - Recovery Act: LIPA Smart Energy Corridor Project - Ming Mui, LIPA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Program Program Peer Review Meeting DE-OE0000220 LIPA Long Island Smart Energy Corridor Ming Mui and Sunil Katwala June 8, 2012 December 2008 LIPA Long Island Smart Energy Corridor Objective Life-cycle Funding ($K) Fiscal Years 2010 to 2015 DOE Funding $ 12,496K Total Project Cost $ 25,293K* Technical Scope (Insert graphic here) * Additional funding from LIPA and SUNY Research Foundation Smart Energy Corridor will: (1) Validate Smart Grid technologies; (2) Quantify Smart Grid costs and benefits; (3) Validate Smart Grid applications at a scale that can be readily adapted and replicated in individual homes and businesses. * Demonstrate Technolgy (DA, Sub Auto, AMI, DLC) * Marketing (TOU Rates, Webtools, Visualization) * Cyber Security (Vulneribility Testing & Hardening)

79

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft WWEC PEIS September 2007 Draft WWEC PEIS September 2007 i DOCUMENT CONTENTS VOLUME I Executive Summary Chapter 1: Why Are Federal Agencies Proposing to Designate Energy Corridors in the West? Chapter 2: What Are the Alternatives Evaluated in This PEIS? Chapter 3: What Are the Potential Environmental Consequences of Corridor Designation and Land Use Plan Amendment? Chapter 4: How Are Cumulative Impacts Evaluated? Chapter 5: What Unavoidable Adverse Impacts Might Be Caused by Corridor Designation and Land Use Plan Amendment? Chapter 6: The Relationship between Local Short-Term Uses of the Environment and Long-Term Productivity Chapter 7: What Irreversible and Irretrievable Commitment of Resources Would Be Involved with Implementation of the Alternatives? Chapter 8: List of Preparers

80

EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

490: Boulder City/U.S. 93 Corridor Transportation 490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, Nevada EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder County, Nevada SUMMARY The Federal Highway Administration and the Nevada Department of Transportation prepared an EIS to evaluate the potential environmental impacts of the proposed Boulder City/U.S. 93 Bypass Project in Boulder County, Nevada. DOE's Western Area Power Administration, a cooperating agency, adopted the Final EIS and issued a Record of Decision to modify Western's transmission system and facilities to accommodate the construction of the project. The project website is http://www.nevadadot.com/Micro-Sites/BoulderCityBypass/The_Boulder_City_Bypass.aspx. PUBLIC COMMENT OPPORTUNITIES

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

I-5 Corridor Reinforcement Project Fact Sheet -- Keeping the...  

NLE Websites -- All DOE Office Websites (Extended Search)

Proposed New Substation Proposed Route Segments Segments no longer being considered BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

82

BPA, transmission, I-5 Corridor Reinforcement Project, new Permission...  

NLE Websites -- All DOE Office Websites (Extended Search)

also identify protective measures that BPA would take during the construction process if BPA decides to build a transmission line or substation. An archeologist or historian may...

83

BPA transmission, I-5 corridor reinforcement project, updated...  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Proposed New Substation sde.SDE.BPAPlannedTlines sde.SDE.BPAPlannedTlines BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

84

BPA Transmission, I-5 Corridor Reinforcement Project, Scoping...  

NLE Websites -- All DOE Office Websites (Extended Search)

the transmission lines and consider energy efficiency strategies. Commenters also asked BPA to consider whether a new substation will be needed half-way between Troutdale and...

85

BPA, Transmission, I-5 Corridor Reinforcement Project Map, August...  

NLE Websites -- All DOE Office Websites (Extended Search)

lettered route segments added for consideration Segments no longer being considered 5 K BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

86

BPA, proposed I-5 Corridor Reinforcement transmission project...  

NLE Websites -- All DOE Office Websites (Extended Search)

Regional GIS Database, 2009. Facilities Proposed New Substation Proposed Route Segments BPA Substation Non-BPA Substation BPA Transmission Lines Cities and Towns Urban Areas...

87

BPA, Transmission, I-5 Corridor Reinforcement Project, November...  

NLE Websites -- All DOE Office Websites (Extended Search)

Draft tower, line locations available BPA has released its preliminary designs showing tower and right-of-way locations. Information is now available online, allowing landowners to...

88

BPA, Transmission, presentation on I-5 Corridor Reinforcement...  

NLE Websites -- All DOE Office Websites (Extended Search)

high-voltage line between two proposed substations in Castle Rock, Washington and Troutdale, Oregon. Would relieve a major transmission bottleneck in the Northwest. BPA has not...

89

BPA, Transmission, I-5 Corridor Reinforcement, scoping meeting...  

NLE Websites -- All DOE Office Websites (Extended Search)

line from a new substation near Castle Rock WA to a near Castle Rock, WA to a new substation near Troutdale, OR. BPA is proposing route segments that will be refined into...

90

BPA, Transmission, I-5 Corridor Reinforcement Project factsheet...  

NLE Websites -- All DOE Office Websites (Extended Search)

near Castle Rock, Wash., and Troutdale, Ore. The new line would be about 70 miles long. BPA has identified four route alternatives. Each includes a new substation near Castle...

91

BPA, Transmission, I-5 Corridor Reinforcement Project, February...  

NLE Websites -- All DOE Office Websites (Extended Search)

could help relieve congestion in the Longview area, eliminate the need for a new substation at Castle Rock, and allow BPA to move the northern terminus of the line to the...

92

EIS-0436: I-5 Corridor Reinforcement Project, Multnomah County...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Cowlitz and Clark Counties, Washington SUMMARY This EIS will evaluate a proposal by BPA to build a 500-kilovolt (kV) lattice-steel-tower transmission line that would run from...

93

BPA, transmission, I-5 Corridor Reinforcement Project, letter...  

NLE Websites -- All DOE Office Websites (Extended Search)

made to the PEP form and how they affect any rights you may or have granted. Background - BPA is proposing to build a 500-kilovolt transmission line and associated substations. The...

94

BPA, Transmission, I-5 Corridor Reinforcement Project, abbreviated...  

NLE Websites -- All DOE Office Websites (Extended Search)

About the Project 500-kilovolt transmission New substations at - Castle Rock, Wash. - Troutdale, Ore. 70 miles apart Many route segments 9 Benefits of a new line Keeps the lights...

95

Port competition and network polarization at the East Asian maritime corridor  

E-Print Network (OSTI)

1 Port competition and network polarization at the East Asian maritime corridor This paper Korea Maritime Institute (KMI) Logistics and Port Research Department Sangam-dong, Mapo-gu Seoul, Korea author halshs-00558856,version1-24Jan2011 #12;2 Port competition and network polarization at the East

Boyer, Edmond

96

Service Oriented Architecture for Monitoring Cargo in Motion Along Trusted Corridors  

E-Print Network (OSTI)

Service Oriented Architecture for Monitoring Cargo in Motion Along Trusted Corridors M. Kuehnhausen. It is built as a Service Oriented Architecture (SOA) using open web service specifications and Open Geospatial and the fundamental ideas behind a Service Oriented Architecture are explained in detail. The system was evaluated

Kansas, University of

97

Patch Isolation, Corridor Effects, and Colonization by a Resident Sparrow in a Managed Pine Woodland  

E-Print Network (OSTI)

Patch Isolation, Corridor Effects, and Colonization by a Resident Sparrow in a Managed Pine: The isolation of habitat patches is often cited as having a major impact on the dynamics of small populations occupying patches in a complex iandscape Few studie~ howet~, have provided field data demonstrating

98

Urban/industrial pollution for the New York CityWashington, D. C., corridor, 19961998  

E-Print Network (OSTI)

and Structure: Pollution--urban and regional (0305); 0365 Atmospheric Composition and Structure: TroposphereUrban/industrial pollution for the New York City­Washington, D. C., corridor, 1996­1998: 2. A study and Diagnostics Laboratory, National Oceanic and Atmospheric Administration, Boulder, Colorado, USA Received 11

99

Urban/industrial pollution for the New York CityWashington, D. C., corridor, 19961998  

E-Print Network (OSTI)

Atmospheric Composition and Structure: Pollution--urban and regional (0305); 0365 Atmospheric CompositionUrban/industrial pollution for the New York City­Washington, D. C., corridor, 1996­1998: 1 and Diagnostics Laboratory, National Oceanic and Atmospheric Administration, Boulder, Colorado, USA Received 11

100

An Analysis of the health impacts from PM and NOx emissions resulting from train operations in the Alameda Corridor, CA  

E-Print Network (OSTI)

2009). Estimating PM and NOx Train Emissions in the AlamedaAuthority. Number of Trains Running on the Alameda Corridor.x emissions resulting from train operations in the Alameda

Sangkapichai, Mana; Saphores, Jean-Daniel M; Ogunseitan, Oladele; Ritchie, Stephen G.; You, Soyoung Iris; Lee, Gunwoo

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Draft Programmatic Environmental Impact Statement fo the Designation of Energy Corridors in the 11 Western States  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WWEC PEIS ES-1 October 2007 WWEC PEIS ES-1 October 2007 EXECUTIVE SUMMARY ES.1 WHY ARE FEDERAL AGENCIES PROPOSING TO DESIGNATE ENERGYCORRIDORS IN THE WEST? On August 8, 2005, the President signed into law the Energy Policy Act of 2005 (EPAct). In Subtitle F of EPAct, Congress set forth various provisions that would change the way certain federal agencies 1 (Agencies) coordinated to authorize the use of land for a variety of energy- related purposes. Section 368 of EPAct requires, among other things, the designation of energy corridors on federal lands in 11 western states 2 and the establishment of procedures to ensure that additional corridors are identified and designated as necessary and to expedite applications to construct or modify oil, gas, and

102

Placing power linres : GIS helps site energy corridors.  

SciTech Connect

Turn the lights on when you enter a room, then turn the lights off when you leave. Most of us repeat this sequence many times each day, and never give it another thought. But that seemingly simple light switch on the wall connects us to one of the most complex systems in the world: the electrical grid. Most of the United States is served by a highly reliable and adequate supply of electrical power, which is distributed through a grid of thousands of miles of electricity-transmission lines. However, as the electricity-supply infrastructure ages and consumer demand for electricity grows, the capacity to deliver electrical power hasn't kept pace with demand, and upgrading the electrical-transmission grid has become a more pressing need. From 1988-1998, demand for transmission grew by 30 percent while transmission grew by only 15 percent. From 1999-2009, demand grew by 20 percent and transmission by only 3 percent Despite a short-term decline related to the economic downturn and improved efficiency, U.S. energy consumption is expected to increase by 14 percent between 2008 and 2035. This growth will drive the need to develop viable routes for new transmission lines. Because transmission lines extend over large distances, they typically cross many federal, tribal, state, local and private land jurisdictions, each with a complex and varying set of siting issues and land-management practices. And as the existing grid needs improvement to meet growing demand, the U.S. is rapidly developing renewable energy sources, particularly solar and wind energy, often in areas far removed from existing electricity-transmission infrastructure and energy-consumption areas.

Kuiper, J. A.; Cantwell, B.; Hlohowskyj, I.; Moore, H. R. (Environmental Science Division)

2011-08-01T23:59:59.000Z

103

File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf | Open Energy  

Open Energy Info (EERE)

HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Jump to: navigation, search File File history File usage Metadata File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 31 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 14:14, 29 March 2013 Thumbnail for version as of 14:14, 29 March 2013 1,275 × 1,650 (31 KB) Alevine (Talk | contribs) 12:47, 23 October 2012 Thumbnail for version as of 12:47, 23 October 2012 1,275 × 1,650 (44 KB) Dklein2012 (Talk | contribs) 12:40, 23 October 2012 Thumbnail for version as of 12:40, 23 October 2012 1,275 × 1,650 (44 KB) Dklein2012 (Talk | contribs)

104

Usage of Electric Vehicle Supply Equipment Along the Corridors between the EV Project Major Cities  

SciTech Connect

The report explains how the EVSE are being used along the corridors between the EV Project cities. The EV Project consists of a nationwide collaboration between Idaho National Laboratory (INL), ECOtality North America, Nissan, General Motors, and more than 40 other city, regional and state governments, and electric utilities. The purpose of the EV Project is to demonstrate the deployment and use of approximately 14,000 Level II (208-240V) electric vehicle supply equipment (EVSE) and 300 fast chargers in 16 major cities. This research investigates the usage of all currently installed EV Project commercial EVSE along major interstate corridors. ESRI ArcMap software products are utilized to create geographic EVSE data layers for analysis and visualization of commercial EVSE usage. This research locates the crucial interstate corridors lacking sufficient commercial EVSE and targets locations for future commercial EVSE placement. The results and methods introduced in this research will be used by INL for the duration of the EV Project.

Mindy Kirkpatrick

2012-05-01T23:59:59.000Z

105

McNary-John Day Transmission Line Project Draft Environmental Impact Statement  

SciTech Connect

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35.

N /A

2002-03-08T23:59:59.000Z

106

A B C D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS  

E-Print Network (OSTI)

37 38 39 A B C D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS MDPT_DESC_1 DESC D E F G H I J K RETI PHASE 2A TRANSMISSION LINE SEGMENT ANALYSIS IRMT_SCEJ_2 SCEJ_CAMI_1 SCEJ_PISG_1 Monument X Other Relevant Information (e.g., line size) ROW/Corridor Information 1 ROW no change X X X X 2

107

File:WSR process-flowchart-outside-corridor.pdf | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search File Edit History Facebook icon Twitter icon » File:WSR process-flowchart-outside-corridor.pdf Jump to: navigation, search File File history File usage File:WSR process-flowchart-outside-corridor.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 25 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 08:35, 22 October 2012 Thumbnail for version as of 08:35, 22 October 2012 1,275 × 1,650, 2 pages (25 KB) Dklein2012 (Talk | contribs)

108

Transmission Line Security Monitor: Final Report  

SciTech Connect

The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

John Svoboda

2011-04-01T23:59:59.000Z

109

The Valley Fever Corridor Project The goals are twofold--to teach health care professionals in south-central  

E-Print Network (OSTI)

- long disability requiring extensive medical treatment. Valley Fever cost Arizona $86 million in 2007The Valley Fever Corridor Project The goals are twofold--to teach health care professionals in south-central Arizona, especially in Maricopa County, essential information about Valley Fever

Arizona, University of

110

The River Corridor Closure Contract How Washington Closure Hanford is Closing A Unique Department of Energy Project - 12425  

SciTech Connect

Cleanup of the Hanford River Corridor has been one of Hanford Site's top priorities since the early 1990's. This urgency is due to the proximity of hundreds of waste sites to the Columbia River and the groundwater that continues to threaten the Columbia River. In April 2005, the U.S. Department of Energy, Richland Operations Office (DOE-RL) awarded the Hanford River Corridor Closure Contract (RCCC), a cost-plus incentive-fee closure contract with a 2015 end date and first of its kind at Hanford Site, to Washington Closure Hanford (WCH), a limited-liability company owned by URS, Bechtel National, and CH2M HILL. WCH is a single-purpose company whose goal is to safely, compliantly, and efficiently accelerate cleanup in the Hanford River Corridor and reduce or eliminate future obligations to DOE-RL for maintaining long-term stewardship over the site. Accelerated performance of the work-scope while keeping a perspective on contract completion presents challenges that require proactive strategies to support the remaining work-scope through the end of the RCCC. This paper outlines the processes to address the challenges of completing work-scope while planning for contract termination. WCH is responsible for cleanup of the River Corridor 569.8 km{sup 2} (220 mi{sup 2}) of the 1,517.7 km{sup 2} (586 mi{sup 2}) Hanford Site's footprint reduction. At the end of calendar year 2011, WCH's closure implementation is well underway. Fieldwork is complete in three of the largest areas within the RCCC scope (Segments 1, 2, and 3), approximately 44.5% of the River Corridor (Figure 3). Working together, DOE-RL and WCH are in the process of completing the 'paper work' that will document the completion of the work-scope and allow DOE-RL to relieve WCH of contractual responsibilities and transition the completed areas to the Long-Term Stewardship Program, pending final action RODs. Within the next 4 years, WCH will continue to complete cleanup of the River Corridor following the completion goals. As field work-scope is completed, progressive reductions of business processes, physical facilities, and staff will occur. Organizations will collapse and flatten commensurate with workload. WCH employees will move on to new endeavors, proud of their accomplishments and the legacy they are leaving behind as being the first and largest environmental cleanup closure contract at Hanford. (authors)

Feist, E.T. [Washington Closure Hanford, 2620 Fermi Avenue, Richland, WA 99354 (United States)

2012-07-01T23:59:59.000Z

111

Did "Pookie" get a green-collar job? : a critical case study on the East Bay Green Corridor's employment goals, activities, and impacts  

E-Print Network (OSTI)

This thesis describes the formation of the East Bay Green Corridor (EBGC), a multi-city partnership for green investment in California, and how it failed to create stable, living wage economic opportunities for those with ...

Miller, Matthew J. (Matthew Jordan)

2014-01-01T23:59:59.000Z

112

Line Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

(PDCI) Upgrade Project Whistling Ridge Energy Project Line Rebuild, Relocation and Substation Projects Wind Projects Line Projects BPA identifies critical infrastructure and...

113

Help Line  

NLE Websites -- All DOE Office Websites (Extended Search)

Help Line Help Line Ombuds Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact Ombuds Office (505)665-2837 Email Help Line (505) 667-9370 Fax (505) 667-3119 Map & Hours Help Line: (505) 667-9370 As an option to visiting the Ombuds office, we provide service through a telephone Help Line and email. The telephone Help Line is useful for individuals who have concerns and want advice or referral while preserving confidentiality and anonymity. Callers may remain anonymous and the Help Line does not have caller ID or other methods of identifying callers. The Help Line maintains the same level of confidentiality and neutrality as the other Ombuds services. The Ombuds Help Line is not for reporting emergencies or officially

114

McNary-John Day Transmission Line Project, Final Environmental Impact Statement  

SciTech Connect

Bonneville is proposing to construct, operate, and maintain a 79-mile-long 500-kilovolt-transmission line in Benton and Klickitat Counties, Washington, and Umatilla and Sherman Counties, Oregon. The new line would start at Bonneville's McNary Substation in Oregon and would cross the Columbia River just north of the substation into Washington. The line would then proceed west for about 70 miles along the Columbia River. At the John Day Dam, the line would again cross the Columbia River into Oregon and terminate at Bonneville's John Day Substation. The new line would parallel existing transmission lines for the entire length; mostly within existing available right-of-way. Presently, the existing transmission lines in the area are operating at capacity. These lines help move power from the east side of the Cascades to the west side, where there is a high need for electricity (cities along the I-5 corridor). Because the Northwest has only recently recovered from a shortfall in electric energy supply and a volatile wholesale power market in which prices reached record highs, there are many new proposals for facilities to generate new power. Some of these facilities are in the vicinity of the McNary-John Day project; the proposed line would help insure that existing and newly generated power could move through the system. Bonneville is also considering the No Action Alternative and several short-line routing alternatives. The short routing alternatives include three half-mile-long routes for getting from the McNary Substation to the Columbia River crossing; three two-mile-long routes where the Hanford-John Day transmission line joins the existing corridor; two 1,000-foot-long routes at corridor mile 32; and two 500-foot-long routes at corridor mile 35. This abbreviated final EIS consists of an introduction to the document, changes to the draft EIS, copies of all the comments received on the draft EIS, and Bonneville's written responses to the comments. The final EIS should be used as a companion document to the draft EIS (dated February 2002), which contains the full text of the affected environment, environmental analysis, and appendices.

N /A

2002-08-30T23:59:59.000Z

115

Multi-decadal degradation and persistence of permafrost in the Alaska Highway corridor, northwest Canada  

Science Journals Connector (OSTI)

Changes in permafrost distribution in the southern discontinuous zone were evaluated by repeating a 1964 survey through part of the Alaska Highway corridor (56° N–61° N) in northwest Canada. A total of 55 sites from the original survey in northern British Columbia and southern Yukon were located using archival maps and photographs. Probing for frozen ground, manual excavations, air and ground temperature monitoring, borehole drilling and geophysical techniques were used to gather information on present-day permafrost and climatic conditions. Mean annual air temperatures have increased by 1.5–2.0?° C since the mid-1970s and significant degradation of permafrost has occurred. Almost half of the permafrost sites along the entire transect which exhibited permafrost in 1964 do so no longer. This change is especially evident in the south where two-thirds of the formerly permafrost sites have thawed and the limit of permafrost appears to have shifted northward. The permafrost that persists is patchy, generally less than 15 m thick, has mean annual surface temperatures >0?° C, mean ground temperatures between ?0.5 and 0?° C, is in peat or beneath a thick organic mat, and appears to have a thicker active layer than in 1964. Its persistence may relate to the latent heat requirements of thawing permafrost or to the large thermal offset of organic soils. The study demonstrates that degradation of permafrost has occurred in the margins of its distribution in the last few decades, a trend that is expected to continue as the climate warms.

Megan James; Antoni G Lewkowicz; Sharon L Smith; Christina M Miceli

2013-01-01T23:59:59.000Z

116

Strategy for the Integration of Hydrogen as a Vehicle Fuel into the Existing Natural Gas Vehicle Fueling Infrastructure of the Interstate Clean Transportation Corridor Project: 22 April 2004--31 August 2005  

SciTech Connect

Evaluates opportunities to integrate hydrogen into the fueling stations of the Interstate Clean Transportation Corridor--an existing network of LNG fueling stations in California and Nevada.

Gladstein, Neandross and Associates

2005-09-01T23:59:59.000Z

117

Estimating commuter rail demand to Kendall Square along the Grand Junction Corridor .  

E-Print Network (OSTI)

??Since acquiring the Grand Junction Railroad in June 2010 from CSX, the Massachusetts Bay Transit Authority (MBTA) has explored the possibility of using the line… (more)

Dohm, James

2012-01-01T23:59:59.000Z

118

The Vapor Plume at Material Disposal Are C in Relation to Pajarito Corridor Facilities  

SciTech Connect

A vapor plume made up of volatile organic compounds is present beneath Material Disposal Area C (MDA C) at Los Alamos National Laboratory (LANL). The location and concentrations within the vapor plume are discussed in relation to existing and planned facilities and construction activities along Pajarito Road (the 'Pajarito Corridor') and in terms of worker health and safety. This document provides information that indicates that the vapor plume does not pose a threat to the health of LANL workers nor will it pose a threat to workers during construction of proposed facilities along Pajarito Road. The Los Alamos National Laboratory (LANL or the Laboratory) monitors emissions, effluents, and environmental media to meet environmental compliance requirements, determine actions to protect the environment, and monitor the long-term health of the local environment. LANL also studies and characterizes 'legacy' waste from past Laboratory operations to make informed decisions regarding eventual corrective actions and the disposition of that waste. Starting in 1969, these activities have been annually reported in the LANL Environmental Report (formerly Environmental Surveillance Report), and are detailed in publicly accessible technical reports meeting environmental compliance requirements. Included among the legacy sites being investigated are several formerly used material disposal areas (MDAs) set aside by the Laboratory for the general on-site disposal of waste from mission-related activities. One such area is MDA C located in Technical Area 50 (TA-50), which was used for waste disposal between 1948 and 1974. The location of TA-50 is depicted in Figure 1. The present paper uses a series of maps and cross sections to address the public concerns raised about the vapor plume at MDA C. As illustrated here, extensive sampling and data interpretation indicate that the vapor plume at MDA C does not pose a threat to the health of LANL workers nor will it pose a threat to workers during construction of the proposed facilities and utility trenches. The public cannot be directly exposed to the vapor plume beneath MDA C because Pajarito Road is closed to the public.

Masse, William B. [Los Alamos National Laboratory

2012-04-02T23:59:59.000Z

119

FY-09 Summary Report to the Office of Petroleum Reserves on the Western Energy Corridor Initiative Activities and Accomplishments  

SciTech Connect

To meet its programmatic obligations under the Energy Policy Act of 2005, the Office of Naval Petroleum and Shale Oil Reserves (NPSOR) has initiated the Western Energy Corridor Initiative (WECI). The WECI will implement the Unconventional Strategic Fuels Task Force recommendations for accelerating and promoting the development of domestic unconventional fuels to help meet the nations’ energy needs. The mission of the WECI is to bolster America’s future fuel security by facilitating socially and environmentally responsible development of unconventional fuels resources in the Western Energy Corridor, using sound engineering principles and science-based methods to define and assess benefits, impacts, uncertainties, and mitigation options and to resolve impediments. The Task Force proposed a three-year program in its commercialization plan. The work described herein represents work performed by Idaho National Laboratory (INL) in support of the DOE’s WECI. This effort represents an interim phase of work, designed to initiate only select portions of the initiative, limited by available funding resources within NPOSR. Specifically, the work presented here addresses what was accomplished in FY-09 with the remaining carryover (~$420K) from NPOSR FY-08 funds. It was the intent of the NPOSR program to seek additional funding for full implementation of the full scope of work; however, the original tasks were reduced in scope, terminated, or eliminated (as noted below). An effort is ongoing to obtain funding to continue the tasks initiated under this project. This study will focus on the integrated development of multiple energy resources in a carbon-neutral and environmentally acceptable manner. Emphasis will be placed on analyses of the interrelationships of various energy-resource development plans and the infrastructure, employment, training, fiscal, and economic demands placed on the region as a result of various development scenarios. The interactions at build-out during the design, permitting, and construction of individual and multiple energy developments are not fully considered at the local, state, regional, or national levels. The net impacts to the Western Energy Corridor cannot be understood and the design optimized under the current approach. A regional development plan is needed to model cumulative impacts, determine the carrying capacity of the basin, and provide valuable technically based information to both skeptics and advocates. The INL scope of work for FY-09 involved six tasks: 1. Evaluation of the ASPEN Code as a dynamic systems model for application and use under the WECI and communications with Alberta Oil Sands Research Institutions as an “analog” resource development in the Western Energy Corridor 2. Application of the Aspen Plus computer model to several oil shale processes to consider energy balances and inputs and outputs (e.g. water consumption, CO2 production, etc.) 3. Development of a regulatory roadmap for oil shale developments 4. Defining of the physiographic extent of the natural resource reserves that comprise the Western Energy Corridor 5. A review of the Unconventional Fuels Task Force Report to Congress for ideas, concepts and recommendations that crosscutting plans 6. Program development with stakeholders, including industry, academics, state and federal agencies, and non government organizations. This task also includes project management, strategic development and reporting.

Thomas R. Wood

2010-01-01T23:59:59.000Z

120

RCCC Contract DE-AC06-05RL14655 Attachment J-1: River Corridor...  

NLE Websites -- All DOE Office Websites (Extended Search)

Remediate Waste Site - 100-D-100 100-D-100 Tier 3 Power Line Design and Ground Water Well DecommissioningReplacement REA 184 Not In SPIF 100 D Area 100-DR-2 Remediate...

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Muehrcke's Lines  

Science Journals Connector (OSTI)

Figure 1. A 46-year-old woman with metastatic sarcoma who had been treated with five cycles of doxorubicin, ifosfamide, and mesna chemotherapy presented with two symmetrical, horizontal white lines on all of her fingernails but not on her toenails. A diagnosis of ...

Morrison-Bryant M.; Gradon J.D.

2007-08-30T23:59:59.000Z

122

Beau's Lines  

Science Journals Connector (OSTI)

Figure 1. A 62-year-old woman received six cycles of docetaxel chemotherapy during a six-month period for recurrent metastatic breast cancer. She had completed treatment four weeks before this photograph was taken. Six evenly spaced, transverse lines were noted on ...

Mortimer N.J.; Mills J.

2004-10-21T23:59:59.000Z

123

Minneapolis and Saint Paul, Minnesota: Solar in Action (Brochure...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

stakeholders to create the Energy Innovation Corridor along the proposed Central Corridor light-rail line connecting the two downtowns. The Energy Innovation Corridor will feature...

124

BEAM LINE  

NLE Websites -- All DOE Office Websites (Extended Search)

BEAM LINE BEAM LINE 45 W ILHELM ROENTGEN'S INITIAL DISCOVERY of X-radiation in 1895 led immediately to practical applications in medicine. Over the next few decades X rays proved to be an invaluable tool for the investigation of the micro-world of the atom and the development of the quantum theory of matter. Almost a century later, telescopes designed to detect X-radiation are indispensable for understanding the structure and evolution of the macro-world of stars, galaxies, and the Universe as a whole. The X-Ray Universe by WALLACE H. TUCKER X-ray images of the Universe are strikingly different from the usual visible-light images. 46 SUMMER 1995 did not think: I investigated." Undeterred by NASA's rejection of a proposal to search for cosmic X-radiation, Giacconi persuaded the

125

Environmental Impact Statements; Notice of Availability; FutureGen Final EIS; Draft PEIS for Designation of Energy Corridors in Eleven Western States (11/16/07)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

618 Federal Register 618 Federal Register / Vol. 72, No. 221 / Friday, November 16, 2007 / Notices Corridor Improvement Project, Proposed Roadway Improvements on Route 101 between the Eureka Slough Bridge and 11th St. Overcrossing in Arcata, Humbolt County, CA. Summary: EPA expressed environmental concerns about impacts to air quality and noise. EPA encourages continued interagency coordination to mitigate impacts to wetlands and cumulative impacts. Rating EC2. EIS No. 20070323, ERP No. D-FHW- J40177-CO, US-36 Corridor, Multi- Modal Transportation Improvements between I-25 in Adams County and Foothills Parkway/Table Mesa Drive in Boulder, Adams, Denver, Broomfield, Boulder and Jefferson Counties, CO. Summary: EPA expressed environmental concerns about the wetlands impacts and impacts to the

126

Mack Corridor Project Mack Corridor Project  

E-Print Network (OSTI)

0 1,000 2,000 3,000 4,000 5,000 6,000 Population Total Housing units Households Occupied housing can thrive outside of Detroit's CBD. Walkability KEY DIFFERENCES Hispanic Clientele Strength

Baskaran, Mark

127

CX-001799: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-001799: Categorical Exclusion Determination Pennsylvania Ethanol-85 Corridor Project - Moyer Kutztown Station CX(s) Applied: B5.1 Date: 04202010...

128

CX-003471: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exclusion Determination CX-003471: Categorical Exclusion Determination Pennsylvania Ethanol Fuel (E85) Corridor Project - Lew's Service Center CX(s) Applied: B5.1 Date: 0823...

129

CX-007095: Categorical Exclusion Determination | Department of...  

Energy Savers (EERE)

Determination CX-007095: Categorical Exclusion Determination Paving the Way with Propane: The AutoGas Corridor Development Program CX(s) Applied: B5.1 Date: 10132011...

130

CX-002974: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74: Categorical Exclusion Determination CX-002974: Categorical Exclusion Determination Propane Corridor Development Program - Greenville, South Carolina CX(s) Applied: A1, A7, B5.1...

131

CX-003040: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40: Categorical Exclusion Determination CX-003040: Categorical Exclusion Determination Propane Corridor Development Program CX(s) Applied: A1, A7, B5.1 Date: 07132010...

132

CX-002972: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Categorical Exclusion Determination CX-002972: Categorical Exclusion Determination Propane Corridor Development Program - Traveler's Rest, South Carolina CX(s) Applied: A1, A7,...

133

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 3, 2011 March 3, 2011 CX-005410: Categorical Exclusion Determination North Bonneville-Alcoa Number 1 and 2 Transmission Line Corridor CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration March 3, 2011 CX-005409: Categorical Exclusion Determination Olympia-Grand Coulee Number 1 Transmission Line CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Washington Office(s): Bonneville Power Administration March 2, 2011 CX-005379: Categorical Exclusion Determination Insulator Replacement in Agricultural Lands Along the Grand Coulee-Bell Number 3/Grand Coulee-Westside No. 1 Double Circuit 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/02/2011 Location(s): Lincoln County, Washington Office(s): Bonneville Power Administration

134

Parallel Lines II: Construction of Parallel Lines  

Science Journals Connector (OSTI)

Situations are frequently encountered in which two lines, determined by linear regression, are theoretically...m 1 and m 2.

Ronald J. Tallarida Ph. D.; Rodney B. Murray Ph. D.

1987-01-01T23:59:59.000Z

135

Corridors for Wildlife  

Science Journals Connector (OSTI)

...I suspect that the project of underpasses for the Florida panther is a success (3). Monies used for such projects do not nec-essarily...carbohydrate research partner. We can assist you for one-time, car-bohydrate identification to define your molecule. Or, we...

Christopher P. Dunn

1996-01-12T23:59:59.000Z

136

I-5 Corridor Reinforcement  

NLE Websites -- All DOE Office Websites (Extended Search)

yellow wood sorrel (Oxalis suksdorfii) growing near the existing substation in Troutdale, Ore. News and Highlights June 2014 project update June 2014 interactive map This...

137

Pipeline corridors through wetlands  

SciTech Connect

This paper presents preliminary findings from six vegetational surveys of gas pipeline rights-of-way (ROW) through wetlands and quantifies the impacts of a 20-year-old pipeline ROW through a boreal forest wetland. Six sites of various ages were surveyed in ecosystems ranging from coastal marsh to forested wetland. At all sites except one, both the number and the percentage of wetland species on the Row approximated or exceeded those in the adjacent natural area. The boreal forest study showed that (1) adjacent natural wetland areas were not altered in type; (2) water sheet flow restriction had been reversed by nature; (3) no nonnative plant species invaded the natural area; (4) three-quarters of the ROW area was a wetland, and (5) the ROW increased diversity.

Zimmerman, R.E.; Wilkey, P.L. (Argonne National Lab., IL (United States)); Isaacson, H.R. (Gas Research Institute (United States))

1992-01-01T23:59:59.000Z

138

Pipeline corridors through wetlands  

SciTech Connect

This paper presents preliminary findings from six vegetational surveys of gas pipeline rights-of-way (ROW) through wetlands and quantifies the impacts of a 20-year-old pipeline ROW through a boreal forest wetland. Six sites of various ages were surveyed in ecosystems ranging from coastal marsh to forested wetland. At all sites except one, both the number and the percentage of wetland species on the Row approximated or exceeded those in the adjacent natural area. The boreal forest study showed that (1) adjacent natural wetland areas were not altered in type; (2) water sheet flow restriction had been reversed by nature; (3) no nonnative plant species invaded the natural area; (4) three-quarters of the ROW area was a wetland, and (5) the ROW increased diversity.

Zimmerman, R.E.; Wilkey, P.L. [Argonne National Lab., IL (United States); Isaacson, H.R. [Gas Research Institute (United States)

1992-12-01T23:59:59.000Z

139

DOE/EIS-0265-SA-170: Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project (8/11/04)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, 2004 1, 2004 REPLY TO ATTN OF: KEC-4 SUBJECT: Supplement Analysis for the Watershed Management Program EIS (DOE/EIS-0265/SA-170) Jonathan McCloud Fish and Wildlife Project Manager - KEWL-4 Proposed Action: Tapteal Bend Riparian Corridor Restoration Project Project No: 2002-018-00 Watershed Management Techniques or Actions Addressed Under This Supplement Analysis (See App. A of the Watershed Management Program EIS): 1.9 Structural Bank Protection Using Bioengineering Methods, 2.1 Maintain Healthy Riparian Plant Communities Location: Benton County, Washington Proposed by: Bonneville Power Administration (BPA) and the Tapteal Bend Greenway Association Description of the Proposed Action: The Bonneville Power Administration is proposing to fund the

140

Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii  

SciTech Connect

Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

1993-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

North Australian Cloud Lines  

Science Journals Connector (OSTI)

A satellite classification and climatology of propagating mesoscale cloud fines in northern Australia is presented. These cloud fines range from long, narrow lines of shallow convection to extensive deep convective squall lines with mesoscale ...

W. Drosdowsky; G. J. Holland

1987-11-01T23:59:59.000Z

142

Germ-line Allele  

NLE Websites -- All DOE Office Websites (Extended Search)

Germ-line Allele Germ-line Allele Name: Rachel Location: N/A Country: N/A Date: N/A Question: Can you please explain a "germ-line allele" to me! It is very important for a research paper I am writing about breast cancer. Replies: Mutations in genes are only able to be passed to the offspring if they are found in gametes (egg, sperm) mutations that occur in body cells other than gametes are usually not important because the cells can be replaced and they die eventually. The only way a characteristic can be passed to the offspring is through the eggs and sperm, so if there is a mutation in one these cells, the offspring can inherit the mutation. So a germ-line cell is a gamete. And a germ line allele is a version of the trait that is passed to the offspring through the germ line cell (or gamete).

143

Nematostatics of triple lines  

Science Journals Connector (OSTI)

The Landau–de Gennes model for nematic liquid crystal bulk and interfaces has been extended to nematic triple lines involving the intersection of two isotropic fluids and one nematic liquid crystalline phase. A complete set of bulk, interface, and triple line force and torque balance equations has been formulated. The triple line force and torque balance equations have linear, interfacial, and bulk contributions. The bulk contributions appear as junction integrals, the surface contributions as junctions sums, and the line contributions as gradients of stresses. Reduction of dimensionality from three to one dimensional creates the following effects: (a) bulk terms enter interfacial balances as surface jumps and line balances as junction integrals, and (b) surface terms enter linear balances as junction sums. Line stress and torque equations are derived using classical liquid crystal models. The correspondence between line stress and line torque and their surface and bulk analogs is established. The triple line force and torque balance equations are use to analyze the contact angle in a nematic lens lying at the interface between two isotropic fluids, when the prefered surface orientation is tangential. The effect of anisotropy and long range elasticity on triple line phases is established. Under weak anchoring the contact angle is shown to be a function of the anchoring energy at the nematic-isotropic interface, while under strong anchoring conditions the contact angle is a function of the Peach-Koehler force that originates from bulk long range elasticity and acts on the triple line. The use of the complete set of balance equations removes the classical inconsistency in force balances at a contact line by properly taking into account long range (bulk gradient elasticity) and anisotropic (interfacial anchoring elasticity) effects.

Alejandro D. Rey

2003-01-30T23:59:59.000Z

144

Series Transmission Line Transformer  

DOE Patents (OSTI)

A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

Buckles, Robert A. (Livermore, CA); Booth, Rex (Livermore, CA); Yen, Boris T. (El Cerrito, CA)

2004-06-29T23:59:59.000Z

145

CX-006582: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

582: Categorical Exclusion Determination 582: Categorical Exclusion Determination CX-006582: Categorical Exclusion Determination Access Road Maintenance Along the McNary-Santiam 230-Kilovolt and Jones Canyon-Santiam 230-Kilovolt Transmission Line Corridors CX(s) Applied: B1.3 Date: 08/22/2011 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the rights-of-way. The work involves approximately 5,000 linear feet of road reconstruction or improvement work. The roadwork is needed to improve access for crews that will be maintaining the transmission line and towers within the transmission line corridor. The work will consist primarily of

146

Geodesic Lines, . . . Covariant . . .  

E-Print Network (OSTI)

Geodesic Lines, . . . Covariant . . . Home Page Title Page Page 781 of 818 Go Back Full Screen Close Quit 14.11. Geodesic Lines, Local Gauss-Bonnet Theorem Geodesics play a very important role in surface theory and in dynamics. One of the main reasons why geodesics are so important

Gallier, Jean

147

Transmission Line Security Monitor  

SciTech Connect

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

148

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

149

Patch-occupancy models indicate human activity as major determinant of forest elephant Loxodonta cyclotis seasonal distribution in an industrial corridor in Gabon  

Science Journals Connector (OSTI)

The importance of human activity and ecological features in influencing African forest elephant ranging behaviour was investigated in the Rabi–Ndogo corridor of the Gamba Complex of Protected Areas in southwest Gabon. Locations in a wide geographical area with a range of environmental variables were selected for patch-occupancy surveys using elephant dung to assess seasonal presence and absence of elephants. Patch-occupancy procedures allowed for covariate modelling evaluating hypotheses for both occupancy in relation to human activity and ecological features, and detection probability in relation to vegetation density. The best fitting models for old and fresh dung data sets indicate that (1) detection probability for elephant dung is negatively related to the relative density of the vegetation, and (2) human activity, such as presence and infrastructure, are more closely associated with elephant distribution patterns than are ecological features, such as the presence of wetlands and preferred fresh fruit. Our findings emphasize the sensitivity of elephants to human disturbance, in this case infrastructure development associated with gas and oil production. Patch-occupancy methodology offers a viable alternative to current transect protocols for monitoring programs with multiple covariates.

Ralph Buij; William J. McShea; Patrick Campbell; Michelle E. Lee; Francisco Dallmeier; Sylvain Guimondou; Loďc Mackaga; Nicaise Guisseougou; Serge Mboumba; James E. Hines; James D. Nichols; Alfonso Alonso

2007-01-01T23:59:59.000Z

150

Pipeline corridors through wetlands -- Impacts on plant communities: Little Timber Creek Crossing, Gloucester County, New Jersey. Topical report, August 1991--January 1993  

SciTech Connect

The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents results of a survey conducted over the period of August 5--7, 1991, at the Little Timber Creek crossing in Gloucester County, New Jersey, where three pipelines, constructed in 1950, 1960, and 1990, cross the creek and associated wetlands. The old side of the ROW, created by the installation of the 1960 pipeline, was designed to contain a raised peat bed over the 1950 pipeline and an open-water ditch over the 1960 pipeline. The new portion of the ROW, created by installation of the 1990 pipeline, has an open-water ditch over the pipeline (resulting from settling of the backfill) and a raised peat bed (resulting from rebound of compacted peat). Both the old and new ROWs contain dense stands of herbs; the vegetation on the old ROW was more similar to that in the adjacent natural area than was vegetation in the new ROW. The ROW increased species and habitat diversity in the wetlands. It may contribute to the spread of purple loosestrife and affect species sensitive to habitat fragmentation.

Shem, L.M.; Zimmerman, R.E.; Alsum, S.K. [Argonne National Lab., IL (United States). Center for Environmental Restoration Systems; Van Dyke, G.D. [Argonne National Lab., IL (United States). Center for Environmental Restoration Systems]|[Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology

1994-12-01T23:59:59.000Z

151

Integrated RS, GIS and GPS approaches to archaeological prospecting in the Hexi Corridor, NW China: a case study of the royal road to ancient Dunhuang  

Science Journals Connector (OSTI)

Abstract According to historic records, the wasteland northeast of modern Dunhuang oasis contains remarkable, undiscovered monuments of medieval courier stations. In this study, statistical analysis of historic records and census data, image processing and interpretation of satellite remote sensing images, GIS analysis, and field surveys were carried out to contribute to the discovery of courier stations and the reconstruction of the medieval royal road system from Guazhou to Shazhou. Firstly, in order to obtain the existence regions of courier stations, historic records and census data were abstracted and digitized, for generating preliminary regions of interest by using GIS tools. Secondly, dried river channels and traces of the Great Wall were extracted from the remote sensing images, and GIS buffer and overlay analyses were applied to the creation of prospective sub-areas. Thirdly, prospective sub-areas were mapped from very high resolution WorldView-2 images, and suspected sites were found based on the human-computer interactive interpretation. Fourthly, suspected sites were investigated on the GPS-based archaeological survey, and were confirmed as two courier stations based on the remains of Han-Tang period observed at sites' surface. Lastly, the royal road to ancient Dunhuang, one of the most important sections of the royal road system in the Hexi Corridor, was discussed and reconstructed with the combined application of remote sensing imagery and ground-truthing.

Lei Luo; Xinyuan Wang; Chuansheng Liu; Huadong Guo; Xiaocui Du

2014-01-01T23:59:59.000Z

152

Approaches To Integrating A HIgh Penertration Of Solar PV and CPV Onto The Electrical Grid  

E-Print Network (OSTI)

50  Transmission Line corridors for new transmission lines to transport renewablethat building new transmission lines alone (assuming they

Hill, Steven Craig

2013-01-01T23:59:59.000Z

153

Holes in Spectral Lines  

E-Print Network (OSTI)

The decay of an atom in the presence of a static perturbation is investigated. The perturbation couples a decaying state with a nondecaying state. A "hole" appears in the emission line at a frequency equal to the frequency ...

Fontana, Peter R.; Srivastava, Rajendra P.

1973-06-01T23:59:59.000Z

154

Electric Transmission Lines (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

Electric transmission lines capable of operating at 69 kV or greater cannot be constructed along, across, or over any public highways or grounds outside of cities without a franchise from the...

155

Lifting by Convergence Lines  

Science Journals Connector (OSTI)

The lifting depth of a convergence line in an unstratified boundary layer beneath a stably stratified atmosphere is examined with both analytical and numerical models. Cases are considered with and without flow in the layer above the convergence ...

N. Andrew Crook; Joseph B. Klemp

2000-03-01T23:59:59.000Z

156

CX-005410: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

410: Categorical Exclusion Determination 410: Categorical Exclusion Determination CX-005410: Categorical Exclusion Determination North Bonneville-Alcoa Number 1 and 2 Transmission Line Corridor CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Clark County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road reconstruction work to improve vehicle access to structures 16/6, 16/7 and 17/1 of the North Bonneville-Alcoa Number 1 and 2 transmission line corridor from southeast 37th Street to the right-of-way, then to structure 16/6 to the east, and structure 17/1 to the west. The total distance of this project is approximately 2200 feet. Project work may include, but is not limited to: vegetation removal to clear a 20-foot width, grading and

157

Line tension vector thermodynamics of anisotropic contact lines  

Science Journals Connector (OSTI)

Multiphase materials with intersecting diving surfaces give rise to contact lines. A line tension vector thermodynamics formalism is developed and used to analyze contact line problems in the presence of anisotropy, taking into account two elastic modes: change in contact line length and change in contact line orientation. Using this formalism, the contact line-shape equation is derived, and the renormalization of the line tension due to anisotropy is characterized. The correspondence and analogies between the shape equation for anisotropic surfaces (Herring equation) and the shape equation for contact lines is established. Line energies for nematic liquid crystals, representative of generic anisotropic contact lines, are used to derive a shape equation that takes into account ambient orientation effects. It is found that anisotropic line tension may promote bending and chiral modes to avoid unfavorable orientations of the contact line with respect to the ambient nematic ordering.

Alejandro D. Rey

2004-04-30T23:59:59.000Z

158

Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line 9/30/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

30, 30, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA 106 SnoKing Tap to Monroe-Samamish Line Don Atkinson - TFN/Snohomish Proposed Action: Vegetation Management along the SnoKing Tap to the Monroe-Samamish transmission line from structure 8/1 through structure 20/6. Right of way width is 150 feet. Location: The project area is located within Snohomish County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of-way, access roads and around tower structures along the subject transmission line corridor. The right-of-way will be treated using selective and non-selective methods that include hand cutting, mowing and herbicide treatments. Approximately 12 miles of access roads

159

Transmission line capital costs  

SciTech Connect

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

160

Pipeline corridors through wetlands - impact on plant communities: Mill Creek Tributary Crossing, Jefferson County, New York, 1991 survey. Topical report, June 1991--April 1993  

SciTech Connect

The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and right-of-way (ROW) management practices. This report presents the results of a survey conducted in June 1991 at the Mill Creek tributary crossing, Jefferson County, New York. One pipeline had been installed through the wetland in 1966, and another was scheduled to be installed later in 1991. Data were collected along the existing pipeline ROW and also along the planned ROW for use as baseline data in future studies. Four separate communities were surveyed. A scrub-shrub wetland and a forested wetland were sampled along the existing ROW where the planned pipeline was to be installed. A mixed vegetation community was sampled along the existing ROW, west of where the planned pipeline would joint the ROW. A marsh community was sampled along the route of the planned pipeline. All plant species found on the ROW of the scrub-shrub community were also present in the adjacent natural areas. The vegetation on the ROW of the forested wetland community also consisted mostly of species found in the adjacent natural areas. In the mixed vegetation community, a small drainage channel present on the ROW, possibly resulting from the pipeline construction, provided habitat for a number of obligate species not found in other areas of this community. Differences noted among different areas of this community were also attributed to slight variations in elevation.

Van Dyke, G.D. [Argonne National Lab., IL (United States)]|[Trinity Christian College, Palos Heights, IL (United States); Shem, L.M.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

1994-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Construction of Distribution Lines, Service Lines, and New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Certain Visually Significant Resources Outside Residential Subdivisions (New York) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State New York Program Type Environmental Regulations Provider New York State Public Service Commission Any proposed construction of distribution lines, service lines, and appurtenant facilities to electric utilities located near scenic areas of

162

Apparent ridges for line drawing  

E-Print Network (OSTI)

Non-photorealistic line drawing depicts 3D shapes through the rendering of feature lines. A number of characterizations of relevant lines have been proposed but none of these definitions alone seem to capture all ...

Judd, Tilke (Tilke M.)

2007-01-01T23:59:59.000Z

163

Harry: Between the Lines  

E-Print Network (OSTI)

I 5. ; ..v^-rr>.>-'- j??!*f fefi ( -??;r' ,, ;rl&.i:-??t**rK&d t ? -?, .- 'c-y. ~ :'y$???M .'??. ??.v-'-/i / ' , *? I te / - 5- MAGNUM FORCE: HARRY Between The Lines by Ruth Kurz Seeing Harry, instead of The Callahan... Image. (1973) Special thanks to Teri White for the original "first time"*scene. Further thanks JL MW AW DMc A production of AD NAUSEUM PRESS 3613 West Park Road Cleveland, Ohio 44111 MAGNUM FORCE: HARRY Between The Lines by ruth kurz ' "I...

Kurz, R.; White, T.

1982-01-01T23:59:59.000Z

164

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

1991-08-27T23:59:59.000Z

165

Printed circuit dispersive transmission line  

DOE Patents (OSTI)

A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

Ikezi, Hiroyuki (Rancho Santa Fe, CA); Lin-Liu, Yuh-Ren (San Diego, CA); DeGrassie, John S. (Encinitas, CA)

1991-01-01T23:59:59.000Z

166

Scha's Parallel Lines Bernhard Nickel  

E-Print Network (OSTI)

Scha's Parallel Lines Bernhard Nickel May 10, 2010 1 Introduction Scha (1981) has a famous example) The single lines run parallel to the double lines. 3 Code for Figure 1 \\begin{figure} \\centering \\setlength{\\unitlength}{.5in} \\begin{picture}(6,4) % first square \\put(0,4){\\line(1,0){4}}% \\put(0,1){\\line(1,0){4}}% \\put(0

Nickel, Bernhard

167

Drill string transmission line  

DOE Patents (OSTI)

A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David S. (Lehi, UT); Bradford, Kline (Orem, UT); Fox, Joe (Spanish Fork, UT)

2006-03-28T23:59:59.000Z

168

New Construction of Distribution Lines, Service Lines, and Appurtenant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction of Distribution Lines, Service Lines, and Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) New Construction of Distribution Lines, Service Lines, and Appurtenant Facilities in Residential Subdivisions (New York) < Back Eligibility Commercial Installer/Contractor Institutional Investor-Owned Utility Low-Income Residential Multi-Family Residential Municipal/Public Utility Residential Rural Electric Cooperative Schools Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Home Weatherization Water Buying & Making Electricity Solar Wind Program Info State New York Program Type Siting and Permitting Provider New York State Public Service Commission Any proposed construction of electricity-related facilities in residential

169

The Hanford Story: River Corridor  

Energy.gov (U.S. Department of Energy (DOE))

This is the seventh chapter of The Hanford Story, a multimedia presentation that provides an overview of the Hanford Site—its history, today's cleanup activities, and a glimpse into the possibilities of future uses of the 586-square-mile government site in southeast Washington State.

170

Constellations and anti-corridors  

E-Print Network (OSTI)

To perceive the many stars in the sky, corridic logic would force one to view one star at a time, one after the other in a linear order. An anti-corridic logic, on the other hand, is non-linear and permits constellations ...

Ferentinos, Andrew (Andrew George Phillip)

2012-01-01T23:59:59.000Z

171

Utility Lines and Facilities (Montana)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations apply to the construction of utility and power lines and facilities. They address the use of public right-of-ways for such construction, underground power lines, and construction...

172

New Imperial Valley power line  

SciTech Connect

The Imperial Irrigation District placed its new 104-mile, 230kV transmission line in service in the Imperial Valley on September 14, 1988. The power line, with a rated capacity of 600 megawatts, transmits electricity generated at geothermal power plants. The transmission line was financed by 14 geothermal companies, whose participation was based on the amount of line-capacity they expect to use.

Not Available

1988-12-01T23:59:59.000Z

173

a 115-line MATLAB implementation  

E-Print Network (OSTI)

Apr 15, 2013 ... Alternating active-phase algorithm for multimaterial topology optimization problems -- a 115-line MATLAB implementation. Rouhollah Tavakoli ...

Rouhollah Tavakoli

2013-04-15T23:59:59.000Z

174

CX-010632: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination I-75 Green Corridor Project - E85 Station Modification to Include Retail E85 Fuel Dispenser CX(s) Applied: A1, B5.22 Date: 07032013 Location(s): Georgia...

175

CX-010633: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination I-75 Green Corridor Project - E85 Station Modification to Include Retail E85 Fuel Dispenser CX(s) Applied: A1, B5.22 Date: 07032013 Location(s): Florida...

176

CX-002976: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Categorical Exclusion Determination CX-002976: Categorical Exclusion Determination Propane Corridor Development Program CX(s) Applied: A1, A7, B5.1 Date: 07092010 Location(s):...

177

CX-002623: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-002623: Categorical Exclusion Determination Pennsylvania E85 Corridor Project - Sheetz Gas StationStore 412 CX(s) Applied: B5.1 Date: 06102010 Location(s): Harrisburg,...

178

CX-002622: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-002622: Categorical Exclusion Determination Pennsylvania E85 Corridor Project - Sheetz Gas StationStore 426 CX(s) Applied: B5.1 Date: 06102010 Location(s): Carlisle,...

179

CX-002625: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-002625: Categorical Exclusion Determination Pennsylvania E85 Corridor Project - Sheetz Gas StationStore 191 CX(s) Applied: B5.1 Date: 06102010 Location(s): Carlisle,...

180

Transmission Line Circuit Alexander Glasser  

E-Print Network (OSTI)

Chaos in a Transmission Line Circuit Alexander Glasser Marshal Miller With... Prof. Edward Ott Prof times become shorter, circuit connections behave more and more like transmission lines. Theoretical(t) - Transmission Line (Zo, T) #12;5 Cf/Cr 1000 Vf Capacitance Voltage Cf Cr Model for Nonlinear Capacitor

Anlage, Steven

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

CORONAL EMISSION LINES AS THERMOMETERS  

SciTech Connect

Coronal emission-line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G., E-mail: judge@ucar.ed [High Altitude Observatory, National Center for Atmospheric Research , P.O. Box 3000, Boulder CO 80307-3000 (United States)

2010-01-10T23:59:59.000Z

182

Why Neutrino Lines are Hypersharp  

E-Print Network (OSTI)

It was recently pointed out that mono-energetic neutrino lines from the 2-body decay of tritium (tau ~ 18-y) can be emitted, a significant fraction, with natural line width (~10-24 eV) for hypersharp resonance transitions 3H--> line broadening in resonances of short lived (tau ~ microsec) states.

R. S. Raghavan

2009-08-20T23:59:59.000Z

183

Coronal emission lines as thermometers  

E-Print Network (OSTI)

Coronal emission line intensities are commonly used to measure electron temperatures using emission measure and/or line ratio methods. In the presence of systematic errors in atomic excitation calculations and data noise, the information on underlying temperature distributions is fundamentally limited. Increasing the number of emission lines used does not necessarily improve the ability to discriminate between different kinds of temperature distributions.

Judge, Philip G

2009-01-01T23:59:59.000Z

184

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 26060 of 28,904 results. 51 - 26060 of 28,904 results. Download CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-003090-categorical-exclusion-determination Download CX-003363: Categorical Exclusion Determination Infrastructure and Reactor Upgrade Support to Universities CX(s) Applied: B1.7, B3.6 Date: 08/04/2010 Location(s): Idaho Office(s): Idaho Operations Office http://energy.gov/nepa/downloads/cx-003363-categorical-exclusion-determination Page Community Scale Development Below are resources for Tribes on community scale energy project

185

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 5160 of 26,777 results. 51 - 5160 of 26,777 results. Download CX-006830: Categorical Exclusion Determination Hydrogen Storage System Cost Assessment CX(s) Applied: A9 Date: 09/22/2011 Location(s): Virginia Office(s): Energy Efficiency and Renewable Energy, Golden Field Office http://energy.gov/nepa/downloads/cx-006830-categorical-exclusion-determination Download EIS-0285-SA-448: Supplement Analysis Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS- 0285/SA448 Pearl-Marion No. 1 Transmission Line Corridor) Project No. PP&A # 2049 http://energy.gov/nepa/downloads/eis-0285-sa-448-supplement-analysis Download CX-000246: Categorical Exclusion Determination Recovery Act: Wind Blade Manufacturing Innovation CX(s) Applied: A9, B3.6 Date: 12/17/2009

186

Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 15, 2010 June 15, 2010 CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration June 11, 2010 More than $60 Million in Recovery Act Funding to Expand Local Energy Efficiency Efforts in 20 Communities Competitive block grants to support jobs, save money and increase energy independence June 10, 2010 CX-002767: Categorical Exclusion Determination Granite Mountain 3G Radio Station Project CX(s) Applied: B1.19 Date: 06/10/2010 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration June 9, 2010 Clark County Develops On-the-Job Weatherization Training Program

187

Research/Evaluate Restoration of NE Oregon Streams: Effects of Livestock Exclosures (Corridor Fencing) on Riparian Vegetation, Stream Geomorphic Features and Fish Populations; Final Report 2002.  

SciTech Connect

The Pacific Northwest Electric Power Planning and Conservation Act of 1980 indicated ''The council shall properly develop and adopt a program to protect, mitigate, and enhance fish and wildlife, including related spawning grounds and habitat on the Columbia River and its tributaries.'' As a result, the Bonneville Power Administration (BPA) has spent millions of dollars on various instream projects throughout the Columbia Basin with the goal of increasing system-wide production of anadromous fisheries through a combination of habitat restoration and enhancement measures. For two decades, numerous BPA-funded projects have been initiated in the upper Columbia River Basin for the express intent of improving the aquatic habitats of anadromous salmonids. Largely missing from most of these projects has been any rigorous evaluation of project success or failure. Some field reviews of some habitat projects have been undertaken (e.g., Beschta et al. 1991, Kauffman et al. 1993) and provide an overview of major problems and opportunities associated with selected projects. However, there continues to be a lack of quantifiable information, collected in a systematic manner that could be used as the basis for scientifically assessing the effects of individual projects on riparian/aquatic habitats, functions, or processes. Recent publications (e.g., NRC 1992, ISG 1996, NRC 1996, Beschta 1997, and Kauffman et al. 1997) have identified and summarized important concepts associated with the restoration and improvement of aquatic ecosystems. While such conceptual approaches provide an important structure for those undertaking restoration efforts, there remains a paucity of basic information throughout the upper Columbia Basin on the hydrologic, geomorphic, and biologic responses that occur from various enhancement approaches. Basic data on the spatial and temporal responses of restoration approaches would provide: (1) a better understanding of project effects upon aquatic habitats and associated riparian functions; (2) a means of determining rates of aquatic habitat improvement; and (3) a basis for projecting future trends of habitat recovery. The proposed research is intended to provide an improved understanding of both the effects and effectiveness of a commonly used habitat enhancement approach in the upper Columbia River Basin. This is the exclusion of domestic livestock from streamside communities and streams via corridor fencing (exclosures). This final report is broken into three separate chapters. The first chapter covers the vegetation change associated with livestock exclusion. The second chapter focuses on the physical geomorphic changes to the streambank and channel. The final chapter covers the response of salmonids and warmwater fishes to livestock exclusion at the spatial scales of exclosures as is commonly constructed today. It is expected that this study will provide an important scientific basis, currently lacking, for understanding the ecological principles of restoration/enhancement of sustainable aquatic habitats for salmonids. Thus, the results of this work are likely to have important ramifications for habitat improvement projects within and beyond the general geographic region of northeastern Oregon.

Kauffman, J. Boone

2002-09-17T23:59:59.000Z

188

Strategy for the Integration of Hydrogen as a Vehicle Fuel into the Existing Natural Gas Vehicle Fueling Infrastructure of the Interstate Clean Transportation Corridor Project: 22 April 2004--31 August 2005  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

national laboratory of the U.S. Department of Energy national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy National Renewable Energy Laboratory Innovation for Our Energy Future Subcontract Report Strategy for the Integration of NREL/SR-540-38720ďż˝ Hydrogen as a Vehicle Fuel into September 2005 ďż˝ the Existing Natural Gas Vehicle ďż˝ Fueling Infrastructure of the ďż˝ Interstate Clean Transportation ďż˝ Corridor Project ďż˝ April 22, 2004 - August 31, 2005 Gladstein, Neandross & Associates ďż˝ Santa Monica, California ďż˝ NREL is operated by Midwest Research Institute â—Ź Battelle Contract No. DE-AC36-99-GO10337 Strategy for the Integration of Hydrogen as a Vehicle Fuel into the Existing Natural Gas Vehicle Fueling Infrastructure of the Interstate Clean Transportation

189

2005 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

U.S. Energy Information Administration (EIA) Indexed Site

Page 1 Page 1 2012 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE Kerosene Line No. Sold directly to consumers for: 1 Residential Use (Non-Farm): * Backup generator * Home heating and cooking * Personal lawn equipment * EXCLUDE: Apartment buildings and Farmhouses 2 Commercial Use: * Apartment building * Bank * Casino * Church * College/School/Institution * Department/Retail store * Environmental clean-up service * Flushing fuel lines * Forestry service * Golf course * Government (Federal, State, local, and district; INCLUDE fuel used in vehicles) * Hazardous waste company * Hospital * Hotel/Motel * Landfill site government owned * Landscaping * Laundry company * Lumber yard that sells the lumber * Medical service * Port Authority/publicly owned port or loading dock

190

2013 EIA-821 SURVEY: LINE-BY-LINE REFERENCE GUIDE  

Annual Energy Outlook 2012 (EIA)

waste company * Hospital * HotelMotel * Landfill site government owned (exclude private landfill, see Off-highway, as defined on page 3 for Lines 41 through 43) *...

191

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

SciTech Connect

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

192

Bipolar pulse forming line  

DOE Patents (OSTI)

A bipolar pulse forming transmission line module for linear induction accelerators having first, second, third, fourth, and fifth planar conductors which form an interleaved stack with dielectric layers between the conductors. Each conductor has a first end, and a second end adjacent an acceleration axis. The first and second planar conductors are connected to each other at the second ends, the fourth and fifth planar conductors are connected to each other at the second ends, and the first and fifth planar conductors are connected to each other at the first ends via a shorting plate adjacent the first ends. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short a high voltage from the first end of the third planar conductor to the first end of the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

Rhodes, Mark A. (Pleasanton, CA)

2008-10-21T23:59:59.000Z

193

Analysis of interconnect microstrip lines  

E-Print Network (OSTI)

System C. Dyadic Green's Functions 1. TM and TE Decomposition 2. Transmission-Line Green's Functions . NUiVIERICAL PROCEDURES . A. Basis functions and testing procedure . 1. Interconnect of Microstrip Lines 2. Slot-Coupled Microstrip Dipole . 3... data of return loss on the 20 GHz slot-coupled rect- angular patch antenna. . FIG URE Pa. ge 28 Typical transmission line section containing a 1A current source. . . 68 CHAPTER I INTRODUCTION Many studies on slot-coupled microstrip antennas have...

Luong, Giam-Minh

2012-06-07T23:59:59.000Z

194

Testing in Software Product Lines.  

E-Print Network (OSTI)

??This thesis presents research aimed at investigating different activities involved in software product lines testing process and possible improvements towards achieving developing high quality software… (more)

Odia, Osaretin

2007-01-01T23:59:59.000Z

195

NETL LINES OF DEMARCATION 09282012  

NLE Websites -- All DOE Office Websites (Extended Search)

LINES OF DEMARCATION September 28, 2012 Contact: Site Operations Division or ESS&H Division with Questions The oversight, upkeep, and segregation of NETL infrastructure components,...

196

Productivity Improvement of a Manual Assembly Line  

E-Print Network (OSTI)

or re-configuring an assembly system, which is the key step in improving the overall performance of an assembly line. Following this approach, two manual assembly line configurations (single stage parallel line and five-stage serial line...

Yerasi, Pranavi

2012-10-19T23:59:59.000Z

197

SunLine Transit Agency  

Energy.gov (U.S. Department of Energy (DOE))

SunLine Transit Agency provides public transit and community services to California's Coachella Valley. The service area is more than 1,100 square miles and includes nine member cities, as well as Riverside County. Over the years, SunLine has pursued an aggressive strategy for implementing clean technologies into its fleet.

198

Terahertz Quantum-Cascade Transmission-Line Metamaterials  

E-Print Network (OSTI)

Terahertz Transmission-Line Metamaterials . . . . . . .CRLH Transmission Lines . . . . . . . . . . . . . . . .Terahertz CRLH Transmission-Line Metamaterials . . . . . . .

Tavallaee, Amir Ali

2012-01-01T23:59:59.000Z

199

CX-003084: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3084: Categorical Exclusion Determination 3084: Categorical Exclusion Determination CX-003084: Categorical Exclusion Determination Maintenance of and Improvements to the Access Roads from Structure 53/3 through 66/3 of the Fairview-Rogue Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/21/2010 Location(s): Curry County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform road maintenance activities along the access roads of the southern 13 miles of the Fairview-Rogue transmission line from Structure 53/3 to Structure 66/3. There are roughly 32 miles of access roads in this section of transmission line. The proposed access road project is part of ongoing operations and maintenance along this line and this work is proposed for 2010 and 2011.

200

Electric Transmission Line Siting Compact  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electric Transmission Line Siting Compact Electric Transmission Line Siting Compact 1 ______________________________________________________________________________ 2 ARTICLE I 3 PURPOSE 4 5 Siting electric transmission lines across state borders and federal lands is an issue for states, the 6 federal government, transmission utilities, consumers, environmentalists, and other stakeholders. 7 The current, multi-year application review process by separate and equal jurisdictions constitutes 8 a sometimes inefficient and redundant process for transmission companies and complicates the 9 efforts of state and federal policy-makers and other stakeholders to develop more robust 10 economic opportunities, increase grid reliability and security, and ensure the consumers have the 11 lowest cost electricity possible. 12

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Electrical transmission line diametrical retainer  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2004-12-14T23:59:59.000Z

202

Resonance Broadening of Spectral Lines  

Science Journals Connector (OSTI)

A formalism introduced previously by the author is used to calculate the shape of an absorption line in a gas, taking account of the "resonance" interaction between like atoms. The most serious approximation is the neglect of the effect of translational motion. An asymmetric line is obtained, with the maximum shifted slightly toward the red. Some simple classical considerations also agree qualitatively with the results. Various properties of the line shape obtained are briefly discussed. The neglect of translational motion makes it impossible to compare the results with experiments performed up to the present time.

C. Alden Mead

1960-11-01T23:59:59.000Z

203

Pulse shaping with transmission lines  

DOE Patents (OSTI)

A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

Wilcox, Russell B. (Oakland, CA)

1987-01-01T23:59:59.000Z

204

The beauty of laser lines  

E-Print Network (OSTI)

A line, the simplest way to express an artist's feelings or interpretation of an object, has its own emotions that an artist can employ for her purpose. Laser light, the most self-concentrated, self-sustained and directed, ...

Kim, Sue-Mie

1993-01-01T23:59:59.000Z

205

Transmission Lines Emulating Moving Media  

E-Print Network (OSTI)

In this paper, we show how the electromagnetic phenomena in moving magnetodielectric media can be emulated using artificial composite structures at rest. In particular, we introduce nonreciprocal periodically loaded transmission lines which support waves obeying the same rules as plane electromagnetic waves in moving media. Because the actual physical structure is at rest, in these transmission lines there are no fundamental limitations on the velocity values, which may take values larger than the speed of light or even complex values (considering complex amplitudes in the time-harmonic regime). An example circuit of a unit cell of a "moving" transmission line is presented and analyzed both numerically and experimentally. The special case of composite right/left handed host line is also studied numerically. Besides the fundamental interest, the study is relevant for potential applications in realizing engineered materials for various transformations of electromagnetic fields.

Vehmas, Joni; Tretyakov, Sergei

2014-01-01T23:59:59.000Z

206

Crossover energetics for halogenated Si(100): Vacancy line defects, dimer vacancy lines, and atom vacancy lines  

Science Journals Connector (OSTI)

We investigated surface patterning of I-Si(100)-(2×1) both experimentally and theoretically. Using scanning tunneling microscopy, we first examined I destabilization of Si(100)-(2×1) at near saturation. Dimer vacancies formed on the terraces at 600 K, and they grew into lines that were perpendicular to the dimer rows, termed vacancy line defects. These patterns were distinctive from those induced by Cl and Br under similar conditions since the latter formed atom and dimer vacancy lines that were parallel to the dimer rows. Using first-principles density functional theory, we determined the steric repulsive interactions associated with iodine and showed how the observed defect patterns were related to these interactions. Concentration-dependent studies showed that the vacancy patterns were sensitive to the I concentration. Dimer and atom vacancy lines that were elongated along the dimer row direction were favored at lower coverage. Atom vacancy lines dominated at ?0.8ML, they coexisted with dimer vacancy lines at ?0.6-0.7ML, and dimer vacancy lines were exclusively observed below ?0.5ML. These surface patterns reflect the mean strength of the adatom repulsive interactions.

G. J. Xu; N. A. Zarkevich; Abhishek Agrawal; A. W. Signor; B. R. Trenhaile; D. D. Johnson; J. H. Weaver

2005-03-30T23:59:59.000Z

207

fault diagnosis of a high voltage transmission line using waveform ...  

E-Print Network (OSTI)

Oct 4, 2013 ... FAULT DIAGNOSIS OF A HIGH VOLTAGE TRANSMISSION LINE USING ... Fault types such as single line to ground, line to line, double line to ...

Ripunjoy Phukan

2013-10-04T23:59:59.000Z

208

Grism-Based Pulse Shaper for Line-by-Line Control of More than 600 Comb Lines  

Science Journals Connector (OSTI)

We construct a line-by-line pulse shaper using a grism dispersive element and achieve control of over six hundred 21 GHz comb lines. The 13.4 THz bandwidth is the largest ever...

Kirchner, Matthew S; Diddams, Scott A

209

Line-Shape Transition of Collision Broadened Lines  

Science Journals Connector (OSTI)

Using the newly developed technique of THz time-domain spectroscopy, we have measured the far-wing absorption line profile of the ensemble of collision broadened ground state rotational lines of methylchloride vapor out to more than 200 linewidths from resonance, corresponding to frequency offsets as much as 5× the resonant frequency. On these far wings the measured absorption is approximately an order of magnitude less than that predicted by the van Vleck–Weisskopf theory. Our observations show that at higher frequencies a transition occurs from the regime of the van Vleck–Weisskopf theory to the regime of the Lorentz theory.

H. Harde; N. Katzenellenbogen; D. Grischkowsky

1995-02-20T23:59:59.000Z

210

Domain lines as fractional strings  

Science Journals Connector (OSTI)

We consider N=2 supersymmetric quantum electrodynamics with two flavors, the Fayet-Iliopoulos parameter, and a mass term ? which breaks the extended supersymmetry down to N=1. The bulk theory has two vacua; at ?=0 the Bogomol’nyi-Prasad-Sommerfield (BPS) monopoles-saturated domain wall interpolating between them has a moduli space parameterized by a U(1) phase ? which can be promoted to a scalar field in the effective low-energy theory on the wall world-volume. At small nonvanishing ? this field gets a sine-Gordon potential. As a result, only two discrete degenerate BPS domain walls survive. We find an explicit solitonic solution for domain lines—stringlike objects living on the surface of the domain wall which separate wall I from wall II. The domain line is seen as a BPS kink in the world-volume effective theory. We expect that the wall with the domain line on it saturates both the {1,0} and the {12,12} central charges of the bulk theory. The domain line carries a magnetic flux which is exactly 12 of the flux carried by the flux tube living in the bulk on each side of the wall. Thus, the domain lines on the wall confine charges living on the wall, resembling Polyakov’s three-dimensional confinement.

R. Auzzi; M. Shifman; A. Yung

2006-08-11T23:59:59.000Z

211

Domain Lines as Fractional Strings  

E-Print Network (OSTI)

We consider N=2 supersymmetric quantum electrodynamics (SQED) with 2 flavors, the Fayet--Iliopoulos parameter, and a mass term $\\beta$ which breaks the extended supersymmetry down to N=1. The bulk theory has two vacua; at $\\beta=0$ the BPS-saturated domain wall interpolating between them has a moduli space parameterized by a U(1) phase $\\sigma$ which can be promoted to a scalar field in the effective low-energy theory on the wall world-volume. At small nonvanishing $\\beta$ this field gets a sine-Gordon potential. As a result, only two discrete degenerate BPS domain walls survive. We find an explicit solitonic solution for domain lines -- string-like objects living on the surface of the domain wall which separate wall I from wall II. The domain line is seen as a BPS kink in the world-volume effective theory. We expect that the wall with the domain line on it saturates both the $\\{1,0\\}$ and the $\\{{1/2},{1/2}\\}$b central charges of the bulk theory. The domain line carries the magnetic flux which is exactly 1/2 of the flux carried by the flux tube living in the bulk on each side of the wall. Thus, the domain lines on the wall confine charges living on the wall, resembling Polyakov's three-dimensional confinement.

R. Auzzi; M. Shifman; A. Yung

2006-06-07T23:59:59.000Z

212

Computing Criticality of Lines in Power Systems  

E-Print Network (OSTI)

Computing Criticality of Lines in Power Systems Ali P?narto identify critical lines, failure of which can causecriticality measure for all lines at a time, as opposed to

Pinar, Ali; Reichert, Adam; Lesieutre, Bernard

2006-01-01T23:59:59.000Z

213

Vortex lines and transitions in superfluid hydrodynamics  

Science Journals Connector (OSTI)

...Preface to Vortices, dislocations, and line singularities in partial differential equations...Leslie and J. R. Ockendon. Vortex lines and transitions in superfluid hydrodynamics...nature and the motion of qunatized vortex lines. This paper illustrates the transitions...

1997-01-01T23:59:59.000Z

214

Coordination of Transmission Line Transfer Capabilities  

E-Print Network (OSTI)

Coordination of Transmission Line Transfer Capabilities Final Project Report Power Systems since 1996 PSERC #12;Power Systems Engineering Research Center Coordination of Transmission Line Summary The maximum power that can be transferred over any transmission line, called the transfer capacity

215

CX-007750: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-007750: Categorical Exclusion Determination "Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a multiple use request submitted by the City of Longview, Washington, to construct a paved recreational trail (the Highland Trail) for pedestrian and bicycle use on existing BPA transmission line right-of-way in Longview, Washington. The Highland Trail would be located on existing BPA fee-owned right-of-way property along the BPA Longview-Cowlitz Number 1, 115-kilovolt (kV) transmission line corridor. It would be built within a 70-foot-wide Reserve

216

CX-006296: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6296: Categorical Exclusion Determination 6296: Categorical Exclusion Determination CX-006296: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance and reconstruction activities along existing access roads, both on and off the right-of-way. The work involves approximately 4.7 miles of road reconstruction or improvement work on or leading to the Cardwell-Cowlitz No. 1, 115- kilovolt transmission line right-of-way between Cardwell Substation and structure 7/8. The roadwork is needed to improve access for crews that will be replacing the transmission line support structures within the transmission line corridor.

217

Attractor Flows from Defect Lines  

E-Print Network (OSTI)

Deforming a two dimensional conformal field theory on one side of a trivial defect line gives rise to a defect separating the original theory from its deformation. The Casimir force between these defects and other defect lines or boundaries is used to construct flows on bulk moduli spaces of CFTs. It turns out, that these flows are constant reparametrizations of gradient flows of the g-functions of the chosen defect or boundary condition. The special flows associated to supersymmetric boundary conditions in N=(2,2) superconformal field theories agree with the attractor flows studied in the context of black holes in N=2 supergravity.

Ilka Brunner; Daniel Roggenkamp

2010-02-12T23:59:59.000Z

218

Directed lines in sparse potentials  

Science Journals Connector (OSTI)

We present a continuum formulation of a (d+1)-dimensional directed line interacting with sparse potentials (i.e., d-dimensional potentials defined only at discrete longitudinal locations.) An iterative solution for the partition function is derived. The impulsive influence of the potentials induces discontinuities in the evolution of the probability density P(x,t) of the directed line. The effects of these discontinuities are studied in detail for the simple case of a single defect. We then investigate sparse columnar potentials defined as a periodic array of defects in (2+1) dimensions, and solve exactly for P. A nontrivial binding-unbinding transition is found.

T. J. Newman and A. J. McKane

1997-01-01T23:59:59.000Z

219

Objective determination of optimal power line designs.  

E-Print Network (OSTI)

??Includes abstract. The thesis investigated the possibility of overhead power line designs being decided by using an objective rather thana subjective method. Power lines are… (more)

Stephen, Robert G.

2010-01-01T23:59:59.000Z

220

What can emission lines tell us?  

E-Print Network (OSTI)

1 Generalities 2 Empirical diagnostics based on emission lines 3 Photoionization modelling 4 Pending questions 5 Appendix: Lists of useful lines and how to deal with them

G. Stasinska

2007-04-03T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Stark broadening of potassium lines  

Science Journals Connector (OSTI)

Recently published Stark broadening data of potassium ns-4p and nd-4p lines have been reexamined. Newly derived data are compared with theoretical results obtained from a simple approximative formula. The experiment agrees with theoretical results, in average, within ±20%.

N. Konjevi?

1985-07-01T23:59:59.000Z

222

Coiled transmission line pulse generators  

DOE Patents (OSTI)

Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

McDonald, Kenneth Fox (Columbia, MO)

2010-11-09T23:59:59.000Z

223

On the accuracy of line-of-sight velocity measurements using telluric lines as reference lines  

Science Journals Connector (OSTI)

It is demonstrated that telluric lines H2O and O2 are displaced as much as 0.2 mĹ as the solar disk is being scanned. The temporal variations of such displacements have a quasi-periodic character.

N. I. Kobanov

1985-09-01T23:59:59.000Z

224

Proposed Project: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE))

On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line’s proposal was responsive to the RFP, and it is currently under consideration.

225

BOREAS Survey On-Line  

NLE Websites -- All DOE Office Websites (Extended Search)

FF33"> FF33"> BOREAS Survey On-Line To improve the BOREAS and BOREAS Follow-On data sets and to meet users' needs, we are conducting a survey. The BOREAS and BOREAS Follow-On data sets continue to be important products at the ORNL DAAC. To date we have provided over 8,000 data products from these projects to nearly 1,500 users. We invite you to fill out this survey, identifying any problems you had with the data and documentation or any difficulties you experienced in finding and acquiring the data sets. Information you provide will enable us to address problems that need attention. It will also help us determine which aspects of the BOREAS and BOREAS Follow-On information need to be expanded. You can complete the survey at the BOREAS Home Page. After you complete the on-line survey, submit your answers to the ORNL

226

Fuzzy Bags and Wilson Lines  

E-Print Network (OSTI)

I start with an elementary observation about the pressure in the deconfined phase of a SU(3) gauge theory without quarks. This suggests a ``fuzzy'' bag model for the analogous pressure in QCD, with dynamical quarks. I then sketch how the deconfined phase might be described using an effective theory of Wilson lines. To leading order in weak coupling, the effective electric field appears in a form familiar from the lattice theory of Banks and Ukawa.

Robert D. Pisarski

2006-12-15T23:59:59.000Z

227

Dynamic roughening of directed lines  

Science Journals Connector (OSTI)

We study the fluctuations of a stretched string, e.g., a vortex line, moving in a random medium. A pair of nonlinear equations are proposed to describe the evolution of longitudinal and transverse coordinates. The dynamic scaling of the fluctuations is studied analytically (by renormalization group) and numerically. In most cases the fluctuations are superdiffusive, governed by a dynamic exponent z=3/2.

Deniz Erta? and Mehran Kardar

1992-08-10T23:59:59.000Z

228

In-line thermoelectric module  

DOE Patents (OSTI)

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions may be perpendicular to the direction of current flow through the module.

Pento, Robert (Algonquin, IL); Marks, James E. (Glenville, NY); Staffanson, Clifford D. (S. Glens Falls, NY)

2000-01-01T23:59:59.000Z

229

In-Line Thermoelectric Module  

SciTech Connect

A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an-in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions maybe perpendicular to the direction-of current flow through the module.

Pento, Robert; Marks, James E.; Staffanson, Clifford D.

1998-07-28T23:59:59.000Z

230

CX-006585: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Categorical Exclusion Determination 5: Categorical Exclusion Determination CX-006585: Categorical Exclusion Determination Tualatin Hills Park and Recreation District Request for Use of Right-Of-Way for Westside Trail CX(s) Applied: B4.9 Date: 08/25/2011 Location(s): Beaverton, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by Tualatin Hills Park and Recreation District (THPRD) to construct portions of their proposed regional trail on existing BPA transmission line right-of-way (ROW) in the City of Beaverton, Oregon. THPRD?s trail sections would be located on portions of existing BPA fee-owned right-of-way property along the BPA Keeler-Oregon City No. 2 and Oregon City Stub 115-kilovolt transmission line corridors, as well as adjacent non-BPA

231

CX-003447: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3447: Categorical Exclusion Determination 3447: Categorical Exclusion Determination CX-003447: Categorical Exclusion Determination Bridge and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/12/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration The project consists of replacing an existing wooden bridge deck on a Bonneville Power Administration access road to structures in mile 32 of the Monroe - Custer Number 1 transmission line corridor. Work includes furnishing materials and rebuilding the wood deck with low curb rails and reflectors. Both access road approaches will require re-grading and rocking. No fill or other construction materials are allowed at or below the high water line of the underlying stream. No in-stream activities are to occur in any water body or wetland. Erosion control best management

232

CX-003089: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination CX-003089: Categorical Exclusion Determination Perform Routine Access Road Maintenance Within the Big Eddy-Ostrander Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/25/2010 Location(s): Hood River County, Oregon Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers approximately 1.5 miles of road. The

233

CX-006794: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-006794: Categorical Exclusion Determination Naselle-Tarlett Nature Conservancy Access Road Funding CX(s) Applied: B1.13 Date: 09/12/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration In 2010, the Nature Conservancy (property owner), in accordance to agreements with Bonneville Power Administration (BPA), abandoned several sections of legal and usable access roads leading to BPA?s Nasselle-Tarlett 115-kilovolt transmission line corridor. The Nature Conservancy has constructed new, more environmentally friendly sections of access roads on their property to provide BPA alternate access the transmission line right-of-way and structures. BPA proposes to purchase easement rights and provide funding to partially cover construction costs of the new road

234

CX-006300: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

00: Categorical Exclusion Determination 00: Categorical Exclusion Determination CX-006300: Categorical Exclusion Determination Murray Hill Recreation Association Permission to Cross Keeler-Oregon City Transmission Line CX(s) Applied: B4.9 Date: 07/21/2011 Location(s): Washington County, Oregon Office(s): Bonneville Power Administration The Murray Hill Recreation Association has requested permission to cross the Bonneville Power Administration (BPA) right-of-way under the Keeler-Oregon City and Oregon City Stub corridor in order to access the rear of their sports complex to conduct periodic maintenance. The current project proposes to stockpile sand and transport it along an existing roadway beneath the lines to the athletic fields on their complex. The proposal further requests permission to access their complex two-to-three

235

CX-003090: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

90: Categorical Exclusion Determination 90: Categorical Exclusion Determination CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance activities along existing access roads, both on and off (Ha-o-AR-125-1, 125-2, BC-AR-32) the transmission line right-of-way (ROW). The maintenance includes: recurring maintenance to the roadbed and drainage, rerocking, blading, installing water bars, installing drain dips, and/or other minor light road improvements. All work will occur in areas previously disturbed during installation. The project area covers

236

Mud return line connector apparatus  

SciTech Connect

The preferred and illustrated embodiment is a connector adapted to be joined above a blowout preventer and below the rotary table of a drilling rig. It collects the annular flow of returned drilling mud and directs mud to an incorporated, radially directed connective nipple. It enables the blowout preventer to be adjusted in location relative to the drilling rig and further accommodates a variable level of drilling mud in the annular space. The radial nipple connects with a mud line extending at some radial direction with a slope causing the mud to flow by gravity from the annular space to remote located mud tanks.

Ward, B.N.

1981-07-07T23:59:59.000Z

237

Power Lines, Cancer, and Fear  

Science Journals Connector (OSTI)

...hypothesized cause was exposure to extremely-low-frequency magnetic fields generated by the electrical current in power lines. Physicists understand these invisible fields well, but most physicians, parents, and patients do not. The movement of any electrical charge creates a magnetic field that can be measured... Over the past 18 years, there has been considerable interest in the possible link between electromagnetic fields and cancer, especially leukemia. The story of this highly publicized research has been marked by mystery, contradiction, and confusion. When ...

Campion E.W.

1997-07-03T23:59:59.000Z

238

Transmission-Line Metamaterial Design of an Embedded Line Source in a Ground Recess.  

E-Print Network (OSTI)

??A transmission-line metamaterial design of a material-embedded electric line source radiating inside a ground recess is investigated. The media embedding the recessed line source are… (more)

EMIROGLU, CAGLAR D

2011-01-01T23:59:59.000Z

239

MagLab - Transmission Lines Tutorial  

NLE Websites -- All DOE Office Websites (Extended Search)

Tweet Education Home > MagLab U > Interactive Tutorials Arrow Transmission Lines More than half a million miles of high-voltage transmission lines criss-cross the United States. If...

240

Potential Vorticity Anomalies Associated with Squall Lines  

Science Journals Connector (OSTI)

This study involves observations and model simulations of potential vorticity anomalies in the wake of midlatitude squall lines. Using data from the Oklahoma–Kansas PRE-STORM experiment, we analyze potential vorticity fields near two squall lines—...

Rolf F. A. Hertenstein; Wayne H. Schubert

1991-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Route selection and detailed line design  

Science Journals Connector (OSTI)

The requirements for route selection and detailed line design of a high-voltage overhead line are established by the preparatory work, studies ... the required starting and terminal point of a transmission connec...

Dr.-Ing. Friedrich Kiessling; Dipl.-Ing. Peter Nefzger…

2003-01-01T23:59:59.000Z

242

Approximation of inhomogeneous thermal lines via series connection of homogeneous thermal lines  

Science Journals Connector (OSTI)

A method is given for approximating an arbitrary inhomogeneous thermal line (ITL) as a series connection of homogeneous thermal lines (HTL). The method is compared with...

L. S. Eleinikova

1974-10-01T23:59:59.000Z

243

Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization  

DOE Patents (OSTI)

Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes. 21 figs.

Jankowiak, R.J.; Small, G.J.; Shields, P.A.

1999-04-27T23:59:59.000Z

244

Title Line 2 Commercialization at the  

E-Print Network (OSTI)

-exclusive or exclusive license (royalty free or royalty bearing) ­ Researchers sign acknowledgment #12;Title Title Line 2

Czarnecki, Krzysztof

245

Methods of Using Existing Wire Lines (power lines, phone lines, internet lines) for Totally Secure Classical Communication Utilizing Kirchoff's Law and Johnson-like Noise  

E-Print Network (OSTI)

We outline some general solutions to use already existing and currently used wire lines, such as power lines, phone lines, internet lines, etc, for the unconditionally secure communication method based on Kirchoff's Law and Johnson-like Noise (KLJN). Two different methods are shown. One is based on filters used at single wires and the other one utilizes a common mode voltage superimposed on a three-phase powerline.

Laszlo B. Kish

2006-10-02T23:59:59.000Z

246

Kant and Parallel Lines Jeremy Heis  

E-Print Network (OSTI)

Kant and Parallel Lines Jeremy Heis University of California, Irvine HOPOS 2010 #12;Kant. #12;Two interesting issues 1. Was Kant aware of the problems posed to geometry by parallel lines? Did to geometry by parallel lines? Did he reflect on these problems? 2. Did these two "Euclidean" features of Kant

Barrett, Jeffrey A.

247

Stark broadening of Pb IV spectral lines  

Science Journals Connector (OSTI)

......Article Stark broadening of Pbiv spectral lines Rafik Hamdi 1 Nabil Ben Nessib 2 3 Milan...parameters have been calculated for 114 spectral lines of triply charged lead ion (Pbiv) using...electron density of 10173. The studied lines correspond to transitions between the configurations......

Rafik Hamdi; Nabil Ben Nessib; Milan S. Dimitrijevic; Sylvie Sahal-Bréchot

2013-01-01T23:59:59.000Z

248

Molecular Evolutionary Analysis of Cancer Cell Lines  

Science Journals Connector (OSTI)

...Molecular Evolutionary Analysis of Cancer Cell Lines Yan Zhang 1 Michael J. Italia 2 Kurt R...phylogenetic analysis of 353 cancer cell lines based on multiple sequence alignments of...Reconstructed phylogenetic trees cluster cell lines by shared DNA variant patterns rather than...

Yan Zhang; Michael J. Italia; Kurt R. Auger; Wendy S. Halsey; Stephanie F. Van Horn; Ganesh M. Sathe; Michal Magid-Slav; James R. Brown; Joanna D. Holbrook

2010-02-01T23:59:59.000Z

249

Stability of ice-sheet grounding lines  

Science Journals Connector (OSTI)

...81 73 Stability of ice-sheet grounding lines Richard F. Katz 1 * M. Grae Worster 2...ice sheets are sensitive to grounding-line position and variation, characteristics...models. We present a theory for grounding-line dynamics in three spatial dimensions and...

2010-01-01T23:59:59.000Z

250

Minimal surfaces bounded by elastic lines  

Science Journals Connector (OSTI)

...117 Minimal surfaces bounded by elastic lines L. Giomi 1 L. Mahadevan 1 2 * * Author...a minimal surface bounded by an elastic line: the Euler-Plateau problem. We use...a minimal surface bounded by an elastic line. The competition between the surface tension...

2012-01-01T23:59:59.000Z

251

Spectral Theory for Nonconservative Transmission Line Networks  

E-Print Network (OSTI)

Spectral Theory for Nonconservative Transmission Line Networks Robert Carlson Department The global theory of transmission line networks with nonconserva- tive junction conditions is developed from is determined. Specialized results are developed for rational graphs. 1 #12;1 Introduction The transmission line

Carlson, Bob

252

Transmission Line MTF: Magnetized Target Fusion  

E-Print Network (OSTI)

Transmission Line MTF: Magnetized Target Fusion Initial target: preheated & magnetized Subsequent for the FRC. Abstract Block Diagram theta coil transmission line Bias cap. bank maincapacitor inductor PI cap compression to fusion conditions Magnetic field of at least 5 T in a closed-field line topology Density ~ 1017

253

EA-1162: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford-Ostrander transmission line corridor and in a segment of the North Bonneville-Midway corridor. BPA, in cooperation with the U.S. Forest Service has prepared an...

254

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

Gray, K.E.

1988-07-28T23:59:59.000Z

255

Power Line Calculator for DOS  

SciTech Connect

The Power Line Calculator (PLC) for DOS, version 1.0, is a program that describes the electrical characteristics of a transmission or distribution system given user-defined input. This input may consist of a combination of operating currents and phases, symmetric components, power factor, and real or reactive power. The program also allows the user to designate whether currents are present on the system neutral or in the ground. The PLC assumes that any value entered by the user remains fixed (e.g., phase current, power factor), and for underdetermined systems, basic default assumptions are incorporated: the power factor is held at or near 1.0, the net phase current is kept at or near zero, and the phase conductor currents are kept balanced. The program operates under PC/MS-DOS version 3.3 or later, and the output is available in both tabular and graphic formats.

Silva, J.M. (Enertech Consultants, Campbell, CA (United States))

1992-11-01T23:59:59.000Z

256

Unsplit bipolar pulse forming line  

DOE Patents (OSTI)

A bipolar pulse forming transmission line module and system for linear induction accelerators having first, second, third, and fourth planar conductors which form a sequentially arranged interleaved stack having opposing first and second ends, with dielectric layers between the conductors. The first and second planar conductors are connected to each other at the first end, and the first and fourth planar conductors are connected to each other at the second end via a shorting plate. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short at the first end a high voltage from the third planar conductor to the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

Rhodes, Mark A. (Pleasanton, CA)

2011-05-24T23:59:59.000Z

257

Magnetically insulated transmission line oscillator  

DOE Patents (OSTI)

A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

Bacon, Larry D. (Albuquerque, NM); Ballard, William P. (Albuquerque, NM); Clark, M. Collins (Albuquerque, NM); Marder, Barry M. (Albuquerque, NM)

1988-01-01T23:59:59.000Z

258

Superconducting transmission line particle detector  

DOE Patents (OSTI)

A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

Gray, Kenneth E. (Naperville, IL)

1989-01-01T23:59:59.000Z

259

Separation of magnetic field lines  

SciTech Connect

The field lines of magnetic fields that depend on three spatial coordinates are shown to have a fundamentally different behavior from those that depend on two coordinates. Unlike two-coordinate cases, a flux tube in a magnetic field that depends on all three spatial coordinates that has a circular cross section at one location along the tube characteristically has a highly distorted cross section at other locations. In an ideal evolution of a magnetic field, the current densities typically increase. Crudely stated, if the current densities increase by a factor {sigma}, the ratio of the long to the short distance across a cross section of a flux tube characteristically increases by e{sup 2{sigma}}, and the ratio of the longer distance to the initial radius increases as e{sup {sigma}}. Electron inertia prevents a plasma from isolating two magnetic field structures on a distance scale shorter than c/{omega}{sub pe}, which is about 10 cm in the solar corona, and reconnection must be triggered if {sigma} becomes sufficiently large. The radius of the sun, R{sub Circled-Dot-Operator }=7 Multiplication-Sign 10{sup 10}cm is about e{sup 23} times larger, so when {sigma} Greater-Than-Or-Equivalent-To 23, two lines separated by c/{omega}{sub pe} at one location can be separated by the full scale of any magnetic structures in the corona at another. The conditions for achieving a large exponentiation, {sigma}, are derived, and the importance of exponentiation is discussed.

Boozer, Allen H. [Department of Applied Physics and Applied Mathematics, Columbia University, New York, New York 10027 (United States)

2012-11-15T23:59:59.000Z

260

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Line Line (Redirected from Definition:Transmission lines) Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Line Extension Alternatives | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Line Extension Alternatives Line Extension Alternatives Line Extension Alternatives < Back Eligibility Utility Savings Category Energy Sources Buying & Making Electricity Solar Wind Program Info State Vermont Program Type Line Extension Analysis Provider Vermont Department of Public Service The Public Service Board (PSB) of Vermont developed rules regarding utility line extension requests. While the majority of the rules focus on the procedure followed (and associated fees) for the actual line extensions, the PSB also included a provision that requires the electric utilities to provide written information to customers about off-grid electricity generators as an alternative to line extensions. The PSB recognized that in many cases off-grid electricity generators are less expensive than

262

Line Extension Analysis | Open Energy Information  

Open Energy Info (EERE)

Line Extension Analysis Line Extension Analysis Jump to: navigation, search When a prospective electric customer requests service for a home or facility that is not currently serviced by the electric grid, the customer usually must pay a distance-based fee for the cost of extending power lines to the home or facility. In many cases, it is cheaper to use an on-site renewable energy system to meet a prospective customerÂ’s electricity needs. Certain states require utilities to provide information regarding renewable energy options when prospective customers request a line extension. [1] Line Extension Analysis Incentives CSV (rows 1 - 12) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Authorization of Line Extension (Nebraska) Line Extension Analysis Nebraska Agricultural

263

Estes-Flatiron Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Estes-Flatiron Transmission Line Rebuild Estes-Flatiron Transmission Line Rebuild Skip Navigation Links Transmission Functions Infrastructure projects Interconnection OASIS OATT Estes-Flatiron Transmission Line Rebuild Project Western Area Power Administration proposes to rebuild approximately 32 miles of double wood-pole structure 115-kilovolt transmission line that exists between Estes Park and Flatiron Reservoir in Larimer County, Colo. The proposal would remove 16 miles of transmission line, and modernize 16 miles to steel-pole double-circuit 115-kV transmission line. The reduction and modernizing of transmission lines will occur on Federal, state and private lands. The public parcels are administered by the Arapaho and Roosevelt National Forest, which is a cooperating agency in the project.

264

Enhanced Transmission Line Theory: Frequency-Dependent Line Parameters And Their Insertion in a  

E-Print Network (OSTI)

Enhanced Transmission Line Theory: Frequency- Dependent Line Parameters And Their Insertion in a Classical Transmission Line Equation Solver S. Chabane, P. Besnier IETR: Institute of Electronics--In this paper, a modified enhanced transmission- line theory taking into account higher-order modes is described

Paris-Sud XI, Université de

265

Boston Urban Farm : mending the Southwest Corridor  

E-Print Network (OSTI)

This work studies Boston's segregated nature in terms of race and class especially as this coincides with the physical form of the city. Known for its strong neighborhoods, Boston cannot escape definite boundaries between ...

Smith, Timothy Eric

1990-01-01T23:59:59.000Z

266

The problems US 10 corridor context  

E-Print Network (OSTI)

Indirect property owner impacts oCosts #12;#12;·At existing Armstrong ·Slightly to the west of Armstrong ·Approximately a quarter of a mile to the west of Armstrong ·Greater than a quarter of a mile to the west of Armstrong #12;·Slightly west of Armstrong oRight of way impacts oConstruction impacts oVisibility o

Minnesota, University of

267

Energy Transport Corridor Draft Environmental Impact Statement...  

Energy Savers (EERE)

fractional percentages are on lands managed by the Department of the Interior's Fish and Wildlife Service, Bureau of Reclamation and National Park Service, or by the...

268

Lake Michigan Corridor Alternative Fuel Implementation Initiative  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fleet Program (Indiana) 2.4: Document Success and Quantify Impact 2.5: Generation of Smart Green Purchasing Policy Task 3: Barrier Reduction Initiatives 3.1: Weights and...

269

Categorical Exclusion Determinations: American Recovery and Reinvestment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2010 9, 2010 CX-002976: Categorical Exclusion Determination Propane Corridor Development Program CX(s) Applied: A1, A7, B5.1 Date: 07/09/2010 Location(s): Pelzer, South Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory July 9, 2010 CX-002974: Categorical Exclusion Determination Propane Corridor Development Program - Greenville, South Carolina CX(s) Applied: A1, A7, B5.1 Date: 07/09/2010 Location(s): South Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory July 9, 2010 CX-002972: Categorical Exclusion Determination Propane Corridor Development Program - Traveler's Rest, South Carolina CX(s) Applied: A1, A7, B5.1 Date: 07/09/2010 Location(s): South Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy

270

Point-line spaces related to Jordan pairs.  

E-Print Network (OSTI)

??A point-line space is an abstract geometric object that consists of a set of points and a set of lines such that on each line… (more)

Huggenberger, Simon

2009-01-01T23:59:59.000Z

271

Juxtaclavicular beaded lines: A presentation of sebaceous gland hyperplasia  

E-Print Network (OSTI)

Juxta-clavicular beaded lines: A subepidermal proliferationWC. Juxta-clavicular beaded lines. Arch Dermatol 1974;110:A. Juxtaclavicular beaded lines: A malformative condition

Woldow, Adam B; Houk, Laura D; Samie, Faramarz H

2009-01-01T23:59:59.000Z

272

The transcriptional diversity of 25 Drosophila cell lines  

E-Print Network (OSTI)

diversity of 25 Drosophila cell lines Lucy Cherbas, 1 Aarronof Drosophila melanogaster cell lines. ] C R Acad Sci Hebdof two tumorous blood cell lines of Drosophila melanogaster

Cherbas, Lucy

2013-01-01T23:59:59.000Z

273

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

274

Definition: Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Transmission Line Transmission Line Jump to: navigation, search Dictionary.png Transmission Line A system of structures, wires, insulators and associated hardware that carry electric energy from one point to another in an electric power system. Lines are operated at relatively high voltages varying from 69 kV up to 765 kV, and are capable of transmitting large quantities of electricity over long distances.[1] View on Wikipedia Wikipedia Definition An overhead power line, also known as a "pylon" in some areas, is a structure used in electric power transmission and distribution to transmit electrical energy along large distances. It consists of one or more conductors (most often three or four) suspended by towers or utility poles. Since most of the insulation is provided by air, overhead power lines are

275

Roughening Transition in a Moving Contact Line  

E-Print Network (OSTI)

The dynamics of the deformations of a moving contact line on a disordered substrate is formulated, taking into account both local and hydrodynamic dissipation mechanisms. It is shown that both the coating transition in contact lines receding at relatively high velocities, and the pinning transition for slowly moving contact lines, can be understood in a unified framework as roughening transitions in the contact line. We propose a phase diagram for the system in which the phase boundaries corresponding to the coating transition and the pinning transition meet at a junction point, and suggest that for sufficiently strong disorder a receding contact line will leave a Landau--Levich film immediately after depinning. This effect may be relevant to a recent experimental observation in a liquid Helium contact line on a Cesium substrate [C. Guthmann, R. Gombrowicz, V. Repain, and E. Rolley, Phys. Rev. Lett. {\\bf 80}, 2865 (1998)].

Ramin Golestanian; Elie Raphael

2002-04-24T23:59:59.000Z

276

NSLS-II Transport Line Progress  

SciTech Connect

The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

Fliller R. P.; Wahl, W.; Anderson, A.; Benish, B.; DeBoer, W.; Ganetis, G.; Heese, R.; Hseuh, H.-C.; Hu, J.-P.; Johanson, M.P.; Kosciuk, B.N.; Padrazo, D.; Roy, K.; Shaftan, T.; Singh, O.; Tuozzolo, J.; Wang, G.

2012-05-20T23:59:59.000Z

277

Single transmission line data acquisition system  

DOE Patents (OSTI)

A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

Fasching, George E. (Morgantown, WV)

1984-01-01T23:59:59.000Z

278

Iron Lines in Superstrong Magnetic Fields  

Science Journals Connector (OSTI)

The possibility of observing atomic lines in the x-ray spectra of strongly magnetized accreting neutron stars is discussed. For magnetic field strengths ranging from 1011-1014 G, both the energies and oscillator strengths of Fe XXVI lines are calculated quantitatively. These lines are expected to be highest in energy, and should dominate at source temperatures kT?10-30 keV.

H. Ruder; G. Wunner; H. Herold; J. Trümper

1981-06-29T23:59:59.000Z

279

Intelligent fault diagnosis of power transmission line; -.  

E-Print Network (OSTI)

??This dissertation presents the application of recent intelligent newlinetechniques for fault diagnosis in electrical power transmission line Fault newlinesection identification classification and location are the… (more)

Malathi, V

2014-01-01T23:59:59.000Z

280

Big Bend-Witten Transmission Line Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Big Bend-Witten Transmission Line Project The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared a draft environmental...

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Detonator comprising a nonlinear transmission line  

DOE Patents (OSTI)

Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

Elizondo-Decanini, Juan M

2014-12-30T23:59:59.000Z

282

Line Rebuild, Relocation and Substation Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Upgrade Palisades-Goshen Rebuild Wind Projects Line Rebuild, Relocation and Substation Projects BPA has identified several critical rebuild and substation projects...

283

Emergency Management Lines of Inquiry, April 2008  

Energy Savers (EERE)

Lines of Inquiry plansprotocols, interview facility managers and responders, and conduct facility walkdowns, as necessary. In : ment s and responsibilities for program...

284

DOE Sustainability Reporting Open Line Help Call  

Energy.gov (U.S. Department of Energy (DOE))

The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual sustainability reporting process. Representatives from the...

285

EM, County Install Sewer Line for Development  

Energy.gov (U.S. Department of Energy (DOE))

Crews are installing a sewer line in the Portsmouth site to connect EM’s sewer treatment facility to the Pike County Manufacturing Center, which is being developed.

286

Mimicking human-drawn pencil lines.  

E-Print Network (OSTI)

??In applications such as architecture, early design sketches containing accurate line drawings often mislead the target audience [Schumann et al. 1996]. Approximate human-drawn sketches are… (more)

Al-Meraj, Zainab Faisal

2008-01-01T23:59:59.000Z

287

Particles as Wilson lines of gravitational field  

E-Print Network (OSTI)

Since the work of Mac-Dowell-Mansouri it is well known that gravity can be written as a gauge theory for the de Sitter group. In this paper we consider the coupling of this theory to the simplest gauge invariant observables that is, Wilson lines. The dynamics of these Wilson lines is shown to reproduce exactly the dynamics of relativistic particles coupled to gravity, the gauge charges carried by Wilson lines being the mass and spin of the particles. Insertion of Wilson lines breaks in a controlled manner the diffeomorphism symmetry of the theory and the gauge degree of freedom are transmuted to particles degree of freedom.

L. Freidel; J. Kowalski--Glikman; A. Starodubtsev

2006-07-04T23:59:59.000Z

288

Williston to Stateline Transmission Line Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Williston to Stateline Transmission Line Project, ND The Western Area Power Administration (Western), an agency of the Department of Energy (DOE), has prepared an environmental...

289

Grand Coulee Transmission Line Replacement Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Grand-Coulee-Transmission-Line-Replacement-Project Sign In About | Careers | Contact | Investors | bpa.gov Search Doing Business Expand Doing Business Customer Involvement Expand...

290

Crews repair transmission lines after Washington wildfire  

NLE Websites -- All DOE Office Websites (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

291

Southline Transmission Line | Open Energy Information  

Open Energy Info (EERE)

Impact Statement for the Southline Transmission Line Project General NEPA Document Info Energy Sector Transmission Environmental Analysis Type EIS Applicant Southline...

292

Asiakastyytyväisyystutkimus Sun Lines Oy:n tilausristeilyistä.  

E-Print Network (OSTI)

??Tämän tutkimuksellisen opinnäytetyön tarkoituksena on toteuttaa asiakastyytyväisyystutkimus Helsingin saaristossa risteilyliikennettä harjoittavan Sun Lines Oy:n tilausristeilyistä. Vuonna 1956 toimintansa aloittaneen perheyrityksen toimintaan kuuluvat tilausristeilyjen ohella linjaliikenne… (more)

Mattila, Outi

2010-01-01T23:59:59.000Z

293

Two lines or not two lines? That is the question of gamma ray spectra  

SciTech Connect

Lines in the spectrum of cosmic gamma rays are considered one of the more robust signatures of dark matter annihilation. We consider such processes from an effective field theory vantage, and find that generically, two or more lines are expected, providing an interesting feature that can be exploited for searches and reveal details about the underlying theory of dark matter. Using the 130 GeV feature recently reported in the Fermi-LAT data as an example, we analyze the energy spectrum in the multi-line context and find the data to be consistent with a single ?? line, a single ?Z line or both a ?? and a ?Z line.

Rajaraman, Arvind; Tait, Tim M.P.; Whiteson, Daniel, E-mail: arajaram@uci.edu, E-mail: ttait@uci.edu, E-mail: daniel@uci.edu [Department of Physics and Astronomy, University of California, Irvine, 4129 Frederick Reines Hall, Irvine, CA 92697-4575 (United States)

2012-09-01T23:59:59.000Z

294

CX-010147: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Categorical Exclusion Determination 7: Categorical Exclusion Determination CX-010147: Categorical Exclusion Determination Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 04/19/2013 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kV transmission line corridor in the City of Beaverton, Oregon. Microsoft Word - CX_Memo_Amended_TVWD.docx More Documents & Publications CX-009697: Categorical Exclusion Determination CX-009701: Categorical Exclusion Determination CX-010145

295

CX-009701: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

701: Categorical Exclusion Determination 701: Categorical Exclusion Determination CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to grant a Land Use Review Request (LURR) submitted by Williams Northwest Pipeline (WNP) to replace a portion of their 10-inch diameter South Seattle 2454 loop natural gas pipeline within their existing easement on BPA fee-owned right-of-way (ROW) within BPA's Maple Valley-Echo Lake transmission line corridor in King County, Washington. CX-009701.pdf More Documents & Publications CX-008680: Categorical Exclusion Determination EIS-0317-S1: Draft Supplemental Environmental Impact Statement

296

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2571 - 2580 of 9,640 results. 2571 - 2580 of 9,640 results. Download Federal Reporting Recipient Information Recovery Act Recipient Reporting details as of Janurary 5, 2012. http://energy.gov/downloads/federal-reporting-recipient-information-2 Download EA-1862: Finding of No Significant Impact Oneida Seven Generations Corporation: Energy Recovery Project, Green Bay, Wisconsin http://energy.gov/nepa/downloads/ea-1862-finding-no-significant-impact Download CX-003089: Categorical Exclusion Determination Perform Routine Access Road Maintenance Within the Big Eddy-Ostrander Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/25/2010 Location(s): Hood River County, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-003089-categorical-exclusion-determination

297

CX-002123: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23: Categorical Exclusion Determination 23: Categorical Exclusion Determination CX-002123: Categorical Exclusion Determination Missouri Ethanol Blend Infrastructure Project CX(s) Applied: B5.1, B5.2 Date: 04/27/2010 Location(s): Missouri Office(s): Energy Efficiency and Renewable Energy, Golden Field Office Department of Energy is proposing to provide federal funding to the Missouri Com Merchandizing Council (MCMC) for the Missouri Ethanol Blend Infrastructure Project. MCMC proposes to install 14 FlexFuel and 2 Ethanol-85 dispensers at 13 1ocations along the major traffic corridors in Missouri. No tanks or piping would be installed or replaced; rather, existing tanks and lines would be repurposed for use with the FlexFuel and Ethanol-85 fuel pumps. DOCUMENT(S) AVAILABLE FOR DOWNLOAD CX-002123.pdf

298

Electric Transmission Line Flashover Prediction System  

E-Print Network (OSTI)

Center since 1996 PSERC #12;Power Systems Engineering Research Center Electric Transmission LineElectric Transmission Line Flashover Prediction System Ph.D. Thesis and Final Project Report Power@asu.edu Power Systems Engineering Research Center This is a project report from the Power Systems Engineering

299

Transmission line protection based on travelling waves  

Science Journals Connector (OSTI)

Major problem of tripping signal of a relay based on steady state component does not warranty faster tripping schemes for protection of extra high voltage transmission lines. Proposed work has made an attempt to find solution to the problem of fault ... Keywords: postfault voltage, relaying signals, surge impedence, transmission line protection, travelling waves

Anuradha S. Deshpande; Grishma S. Shah

2011-12-01T23:59:59.000Z

300

Nonidentified Kikuchi lines with reverse contrast  

SciTech Connect

Electron diffraction patterns of silicon in transmission with contrast reversal from bright to dark for an unidentified Kikuchi line along its length have been obtained. The contrast reversal of an unidentified line is explained within the elementary mechanism of Kikuchi pattern formation taking into account the Kikuchi electron double diffraction.

Karakhanyan, K. R., E-mail: kkarakhanyan@yandex.ru [Yerevan State University (Armenia)

2009-03-15T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

LA NACION LINE Ciencia/Salud  

E-Print Network (OSTI)

LA NACION LINE Ciencia/Salud Viernes 4 de Abril de 2003 LA NACION LINE | Ed. Anteriores | 4 de Abril de 2003 | Ciencia/Salud | Nota Estudio del Museo Egidio Feruglio, de Trelew La diversidad vegetal://www.lanacion.com.ar/03/04/04/sl_486019.asp LA NACION | 04/04/2003 | Página 14 | Ciencia/Salud Volver a ediciones

Wilf, Peter

302

xDSL line driver design  

E-Print Network (OSTI)

xDSL line driver is a very important element in xDSL systems. This thesis proposes a three stage xDSL line driver solution based on a multipath feedforward compensation principle. TSMC 0.8 micro meter high voltage BiCMOS technology is used as a...

Zhang, Xiaoyong

2001-01-01T23:59:59.000Z

303

Dynamic simulation of polyester mooring lines  

E-Print Network (OSTI)

A numerical scheme, known as CABLE3D, originally developed for the simulation of dynamics of steel chain-wire mooring lines is extended to allow for the large elongation in a mooring line, the dependence of the modulus on tension, and energy...

Kim, Min Suk

2004-09-30T23:59:59.000Z

304

A numerical tool for transmission lines  

Science Journals Connector (OSTI)

The electric line numerical study is usually made through a harmonic approach with the impedance concept based on the Finite Difference discretization in both the time and space domains. These methods present severe drawbacks when used in impulse working ... Keywords: differential system, finite element method, impulse voltage, stiff time problem, transmission line

Hervé Bolvin; André Chambarel; Philippe Neveux

2005-05-01T23:59:59.000Z

305

Multiple gamma lines from semi-annihilation  

SciTech Connect

Hints in the Fermi data for a 130 GeV gamma line from the galactic center have ignited interest in potential gamma line signatures of dark matter. Explanations of this line based on dark matter annihilation face a parametric tension since they often rely on large enhancements of loop-suppressed cross sections. In this paper, we pursue an alternative possibility that dark matter gamma lines could arise from ''semi-annihilation'' among multiple dark sector states. The semi-annihilation reaction ?{sub i}?{sub j} ? ?{sub k}? with a single final state photon is typically enhanced relative to ordinary annihilation ?{sub i}?-bar {sub i} ? ?? into photon pairs. Semi-annihilation allows for a wide range of dark matter masses compared to the fixed mass value required by annihilation, opening the possibility to explain potential dark matter signatures at higher energies. The most striking prediction of semi-annihilation is the presence of multiple gamma lines, with as many as order N{sup 3} lines possible for N dark sector states, allowing for dark sector spectroscopy. A smoking gun signature arises in the simplest case of degenerate dark matter, where a strong semi-annihilation line at 130 GeV would be accompanied by a weaker annihilation line at 173 GeV. As a proof of principle, we construct two explicit models of dark matter semi-annihilation, one based on non-Abelian vector dark matter and the other based on retrofitting Rayleigh dark matter.

D'Eramo, Francesco [Department of Physics, University of California, Berkeley, CA 94720 (United States); McCullough, Matthew; Thaler, Jesse, E-mail: fraderamo@berkeley.edu, E-mail: mccull@mit.edu, E-mail: jthaler@mit.edu [Center for Theoretical Physics, Massachusetts Institute of Technology, Cambridge, MA 02139 (United States)

2013-04-01T23:59:59.000Z

306

Line geometry and electromagnetism I: basic structures  

E-Print Network (OSTI)

Some key notions of line geometry are recalled, along with their application to mechanics. It is then shown that most of the basic structures that one introduces in the pre-metric formulation of electromagnetism can be interpreted directly in terms of corresponding concepts in line geometry. The results are summarized in a table.

D. H. Delphenich

2013-09-11T23:59:59.000Z

307

The Method of Lines for the Analysis of Microstrip Lines on the Finite Width Substrate  

Science Journals Connector (OSTI)

A full-wave analysis of the electrical characteristics of the microstrip lines on the finite width substrate is presented. The substrate layer of the microstrip line must be treated as an inhomogeneous layer. ......

Bo Gao; Ling Tong; Xun Gong

2009-06-01T23:59:59.000Z

308

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL UPDATE TO PLAINS & EASTERN CLEAN LINE PROPOSAL FOR NEW OR UPGRADED TRANSMISSION LINE PROJECTS UNDER SECTION 1222 OF THE ENERGY POLICY ACT OF 2005 AUGUST 2011 Table of Contents 1. Executive Summary .......................................................................................................... 1 2. Project Update .................................................................................................................. 2 a. Jobs and Economic Development ........................................................................................................... 5 b. Interconnection Studies ............................................................................................................................. 6 c. Routing and Public Outreach ................................................................................................................... 7

309

Circumstellar Magnetic Field Diagnostics from Line Polarization  

E-Print Network (OSTI)

Given that dynamically significant magnetic fields in at least some massive stars have now been measured, our contribution addresses the question, to what extent can fields be directly detected in circumstellar gas? The question speaks directly to the very interesting topic of line-driving physics coupled with magnetized plasmas, and how this coupling produces structure in the wind flow. We focus our attention on weak-field diagnostics. These come in two main types: the Hanle effect, which pertains to coherence effects for linear polarization from line scattering, and the weak longitudinal Zeeman effect, which pertains to circular polarization in lines.

Richard Ignace; Kenneth G. Gayley

2007-08-14T23:59:59.000Z

310

Performance evaluation of synthetically lined landfills  

SciTech Connect

Landfill design and performance standards for new facilities frequently require the use of geomembrane composite and double liners. Performance data from synthetically lined landfill sites have not been widely available. This report presents data obtained by monitoring three recently constructed synthetically lined landfill sites. Quantities of leachate removed by the primary and secondary collection systems from these landfills were tabulated. The data show that properly designed and constructed synthetic landfill liners provide effective containment of leachate. The environmental protection provided by synthetic liners is equivalent or superior to that of typical clay-lined facilities.

Maule, J. [Champion International Corp., Norway, MI (United States); Lowe, R.K. [STS Consultants Ltd., Green Bay, WI (United States); McCulloch, J.L. [Cross Pointe Paper Co., Park Falls, WI (United States)

1993-12-01T23:59:59.000Z

311

Definition: Tie Line Bias | Open Energy Information  

Open Energy Info (EERE)

Line Bias Line Bias Jump to: navigation, search Dictionary.png Tie Line Bias A mode of Automatic Generation Control that allows the Balancing Authority to maintain its Interchange Schedule and respond to Interconnection frequency error.[1] Related Terms Balancing Authority, Automatic Generation Control, frequency error, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign Up to see what your friends like. ine Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Tie_Line_Bias&oldid=502569" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

312

Power line communications for smart grid applications  

Science Journals Connector (OSTI)

Power line communication, that is, using the electricity infrastructure for data transmission, is experiencing a renaissance in the context of Smart Grid. Smart Grid objectives include the integration of intermittent renewable energy sources into the ...

Lars Torsten Berger; Andreas Schwager; J. Joaquín Escudero-Garzás

2013-01-01T23:59:59.000Z

313

Electrical Transmission Line Diametrical Retention Mechanism  

DOE Patents (OSTI)

The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

Hall, David R. (Provo, UT); Hall, Jr., H. Tracy (Provo, UT); Pixton, David (Lehi, UT); Dahlgren, Scott (Provo, UT); Sneddon, Cameron (Provo, UT); Briscoe, Michael (Lehi, UT); Fox, Joe (Spanish Fork, UT)

2006-01-03T23:59:59.000Z

314

Transmission line modeling with explicit grounding representation  

Science Journals Connector (OSTI)

This paper presents a new model of an overhead transmission line for electromagnetic transient computations. The unique feature of the model is the explicit representation of the tower grounding configuration and terminal substation grounds. Other properties of the model are: (1) accurate frequency dependent parameter representation from DC to several MHz; (2) explicit modeling of line asymmetries; and (3) high numerical efficiency. The model implementation is based on the solution of the transmission line differential equations resulting in a set of step response functions, forming a matrix. The step response matrix is utilized in a time domain simulation of electric power networks by a linear convolution scheme. The transmission line model is validated with actual system test data. The model is useful for computing the ground potential rise of transmission towers due to lightning or switching surges, insulation stress, etc. Typical applications are described in the paper.

G.J. Cokkinides; A.P.Sakis Meliopoulos

1988-01-01T23:59:59.000Z

315

Effect of Mooring Lines on Ship Motions  

Science Journals Connector (OSTI)

It is commonly accepted that for open sea moorings the effect of the mooring lines on the dynamics of a vessel is restricted to the lower frequency range below the wave spectrum frequencies.

Professor Michael Triantafyllou

1988-01-01T23:59:59.000Z

316

Channelized voice over digital subscriber line  

E-Print Network (OSTI)

The objective of this article is to present a promising voice over digital subscriber line (VoDSL) solution: an alternative method that uses physical layer transportation to provide channelized VoDSL (CVoDSL). This article ...

Habib, A.; Saiedian, Hossein

2002-10-01T23:59:59.000Z

317

Molecular absorption in transition region spectral lines  

E-Print Network (OSTI)

Aims: We present observations from the Interface Region Imaging Spectrograph (IRIS) of absorption features from a multitude of cool atomic and molecular lines within the profiles of Si IV transition region lines. Many of these spectral lines have not previously been detected in solar spectra. Methods: We examined spectra taken from deep exposures of plage on 12 October 2013. We observed unique absorption spectra over a magnetic element which is bright in transition region line emission and the ultraviolet continuum. We compared the absorption spectra with emission spectra that is likely related to fluorescence. Results: The absorption features require a population of sub-5000 K plasma to exist above the transition region. This peculiar stratification is an extreme deviation from the canonical structure of the chromosphere-corona boundary . The cool material is not associated with a filament or discernible coronal rain. This suggests that molecules may form in the upper solar atmosphere on small spatial scales...

Schmit, Donald; Ayres, Thomas; Peter, Hardi; Curdt, Werner; Jaeggli, Sarah

2014-01-01T23:59:59.000Z

318

Refractory Lining Material Improves Gasifer Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

line the interior of slagging gasifiers, where a carbon-based feedstock such as coal, petcoke, andor biomass, is converted at high temperatures in an oxygen-deficient environment...

319

Insulate Steam Distribution and Condensate Return Lines  

Energy.gov (U.S. Department of Energy (DOE))

This tip sheet on insulating steam distribution and condensate return lines provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

320

PROBING QUASAR SIGHT LINES IN THREE DIMENSIONS  

E-Print Network (OSTI)

with the spatial resolution in our datasets. For the sub-DLA galaxy towards PHL 1226, we determine a solar abundance in the emission region using strong line diagnostics. We discuss the possible presence

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Magnetic Field Lines in Fusion Plasmas  

Science Journals Connector (OSTI)

Study of mappings as a part of Hamiltonian dynamics of magnetic field lines in plasmas were initiated by the research...1.... Actually, a fusion research in early sixties gave a huge impact on the development of ...

Sadrilla S. Abdullaev

2006-01-01T23:59:59.000Z

322

The motion of magnetic field lines  

Science Journals Connector (OSTI)

The definition and applications of the motion of magnetic lines of force are reviewed and illustrated. First ... aid to describing the evolution of a known magnetic field. It is next shown that a known velocity field

David P. Stern

1966-11-01T23:59:59.000Z

323

Insulate Steam Distribution and Condensate Return Lines  

SciTech Connect

This revised ITP tip sheet on insulating steam distribution and condensate return lines provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

324

On-Line Magazines, Journals, and Books  

Science Journals Connector (OSTI)

The Internet is a great source for on-line magazines, journals, and books. Several different types are obtainable, from basic text formats to interactive Web documents. Netscape makes it easy to access all of ...

Richard Raucci

1996-01-01T23:59:59.000Z

325

DNA Assembly Line for Nano-Construction  

ScienceCinema (OSTI)

Building on the idea of using DNA to link up nanoparticles scientists at Brookhaven National Lab have designed a molecular assembly line for high-precision nano-construction. Nanofabrication is essential for exploiting the unique properties of nanoparticl

Oleg Gang

2010-01-08T23:59:59.000Z

326

Balanced Atmospheric Response to Squall Lines  

Science Journals Connector (OSTI)

When a Squall line propagates through the atmosphere, it not only excite transient gravity–inertia wave motion but also produces more permanent modifications to the large-scale balanced flow. Here we calculate this balanced response using the is ...

Wayne H. Schubert; Scott R. Fulton; Rolf F. A. Herttenstein

1989-08-01T23:59:59.000Z

327

Calibration for Frequencies of Stellar Spectral Lines  

E-Print Network (OSTI)

When studying the expansion of the universe, a significant problem is measuring the red shifts of stellar absorption lines with sufficiently high accuracy; this requires extremely accurate reference frequencies for calibration. An important recent...

Gomez, Juana

2010-07-14T23:59:59.000Z

328

On the Generation of African Squall Lines  

Science Journals Connector (OSTI)

Squall lines (SLs) form an important component of the meteorology of northern Africa, and in particular, contribute substantially to rainfall totals. Their generation requires the existence of a potentially unstable low-level supply of moisture ...

David P. Rowell; James R. Milford

1993-06-01T23:59:59.000Z

329

factsheet - trees and power lines - July 2008  

NLE Websites -- All DOE Office Websites (Extended Search)

Trees and power lines July 2008 This summer, BPA maintenance crews are inspecting and clearing high-growing vegetation from all 8,500- miles (15,000 circuit miles) of our...

330

Ames Lab 101: Next Generation Power Lines  

SciTech Connect

Ames Laboratory scientist Alan Russell discusses the need to develop new power lines that are stronger and more conductive as a way to address the problem of the nation's aging and inadequate power grid.

Russell, Alan

2010-01-01T23:59:59.000Z

331

Gila to North Gila Transmission Line Rebuild  

NLE Websites -- All DOE Office Websites (Extended Search)

Gila to North Gila Transmission Line Rebuild and Upgrade Project News and updates: On March 21, 2014, Western issued a Finding of No Significant Impact for the proposed action,...

332

Synthesis of Lumped Transmission-Line Analogs  

E-Print Network (OSTI)

Transmission lines and their lumped approximating networks have long been incorporated into radio-frequency power amplifiers to improve efficiency and shape circuit waveforms and are beginning to perform a similar roles ...

Phinney, Joshua W.

333

Corona losses in HVdc bipolar lines  

SciTech Connect

The problem related to the prediction of corona losses in HVdc bipolar lines has been solved, in the past, by means of semi-empirical monomial formulae. However, the proposed formulae that are simpler to use do not always give adequate calculation precision, while the formulae that provide the closest results require implicit functions of different complexity, which are difficult to apply; moreover, it is not possible to understand clearly what influence the variations of the different line parameters have on the losses themselves. The new monomial semi-empirical relationship, proposed to predict the corona losses in HVdc bipolar lines, is very simple to use; it highlights the dependence of power losses due to the corona effect by the different line parameters. The formula has been developed by elaborating a considerable amount of available experimental data.

Corbellini, U.; Pelacchi, P. [Univ. of Pisa (Italy). Dept. of Electric Systems and Automation] [Univ. of Pisa (Italy). Dept. of Electric Systems and Automation

1996-07-01T23:59:59.000Z

334

Design of the ILC RTML Extraction Lines  

SciTech Connect

The ILC [1] Damping Ring to the Main Linac beamline (RTML) contains three extraction lines (EL). Each EL can be used both for an emergency abort dumping of the beam and tune-up continual train-by-train extraction. Two of the extraction lines are located downstream of the first and second stages of the RTML bunch compressor, and must accept both compressed and uncompressed beam with energy spreads of 2.5% and 0.15%, respectively. In this paper we report on an optics design that allowed minimizing the length of the extraction lines while offsetting the beam dumps from the main line by the distance required for acceptable radiation levels in the service tunnel. The proposed extraction lines can accommodate beams with different energy spreads while at the same time providing the beam size acceptable for the aluminum dump window. The RTML incorporates three extraction lines, which can be used for either an emergency beam abort or for a train-by-train extraction. The first EL is located downstream of the Damping Ring extraction arc. The other two extraction lines are located downstream of each stage of the two-stage bunch compressor. The first extraction line (EL1) receives 5GeV beam with an 0.15% energy spread. The extraction line located downstream of the first stage of bunch compressor (ELBC1) receives both compressed and uncompressed beam, and therefore must accept beam with both 5 and 4.88GeV energy, and 0.15% and 2.5% energy spread, respectively. The extraction line located after the second stage of the bunch compressor (ELBC2) receives 15GeV beam with either 0.15 or 1.8% energy spread. Each of the three extraction lines is equipped with the 220kW aluminum ball dump, which corresponds to the power of the continuously dumped beam with 5GeV energy, i.e., the beam trains must be delivered to the ELBC2 dump at reduced repetition rate.

Seletskiy, S.; Tenenbaum, P.; Walz, D.; /SLAC; Solyak, N.; /Fermilab

2011-10-17T23:59:59.000Z

335

Computing Wilson lines with dielectric branes  

E-Print Network (OSTI)

Wilson lines in N=4SYM can be computed in terms of branes carrying electric flux, i.e. F-strings dissolved in their worldvolumes. It is then natural to think that those configurations are the effective description of strings expanding due to dielectric effect to D-branes. In this note we explicitly show this for a class of such configurations, namely those dual to Wilson lines either in the symmetric or in the antisymmetric tensor product of fundamentals.

Diego Rodriguez-Gomez

2006-04-05T23:59:59.000Z

336

An analysis of multiple component mooring lines  

E-Print Network (OSTI)

AN ANALYSIS OF MULTIPLE COMPONENT MOORING LINES A Thesis by THOMAS ROBERT NALTERS Submitted to the Graduate College of Texas ASM University in partial fulfillment of the requirement for the degree of MASTER OF SCIENCE December 1977 Major...'595 ABSTRACT An Analysis Of Multiple Component Mooring Lines (December 1977) Thomas Robert Walters, B. E. , Vanderbilt University Co-Chai rman of Advisory Committee: Dr. Ts ung- Chow Su Co- Chai rman of Advisory Committee: Dr. Richard Domi nguez...

Walters, Thomas Robert

2012-06-07T23:59:59.000Z

337

Relationship between System Slope and Updraft Intensity in Squall Lines  

Science Journals Connector (OSTI)

In recent years there has been debate about whether squall lines have an “optimal state.” It has been repeatedly demonstrated that the slope of a squall line’s convective region is related to the comparative magnitudes of the squall line’s cold ...

Matthew D. Parker

2010-09-01T23:59:59.000Z

338

COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING  

E-Print Network (OSTI)

COMPLETE FAULT ANALYSIS FOR LONG TRANSMISSION LINE USING SYNCHRONIZED SAMPLING Nan Zhang Mladen 77843-3128, U.S.A. Abstract: A complete fault analysis scheme for long transmission line represented fault analysis tool for transmission lines is very useful for on-line confirmation and off-line trouble

339

HOT GAS LINES IN T TAURI STARS  

SciTech Connect

For Classical T Tauri Stars (CTTSs), the resonance doublets of N V, Si IV, and C IV, as well as the He II 1640 A line, trace hot gas flows and act as diagnostics of the accretion process. In this paper we assemble a large high-resolution, high-sensitivity data set of these lines in CTTSs and Weak T Tauri Stars (WTTSs). The sample comprises 35 stars: 1 Herbig Ae star, 28 CTTSs, and 6 WTTSs. We find that the C IV, Si IV, and N V lines in CTTSs all have similar shapes. We decompose the C IV and He II lines into broad and narrow Gaussian components (BC and NC). The most common (50%) C IV line morphology in CTTSs is that of a low-velocity NC together with a redshifted BC. For CTTSs, a strong BC is the result of the accretion process. The contribution fraction of the NC to the C IV line flux in CTTSs increases with accretion rate, from {approx}20% to up to {approx}80%. The velocity centroids of the BCs and NCs are such that V{sub BC} {approx}> 4 V{sub NC}, consistent with the predictions of the accretion shock model, in at most 12 out of 22 CTTSs. We do not find evidence of the post-shock becoming buried in the stellar photosphere due to the pressure of the accretion flow. The He II CTTSs lines are generally symmetric and narrow, with FWHM and redshifts comparable to those of WTTSs. They are less redshifted than the CTTSs C IV lines, by {approx}10 km s{sup -1}. The amount of flux in the BC of the He II line is small compared to that of the C IV line, and we show that this is consistent with models of the pre-shock column emission. Overall, the observations are consistent with the presence of multiple accretion columns with different densities or with accretion models that predict a slow-moving, low-density region in the periphery of the accretion column. For HN Tau A and RW Aur A, most of the C IV line is blueshifted suggesting that the C IV emission is produced by shocks within outflow jets. In our sample, the Herbig Ae star DX Cha is the only object for which we find a P-Cygni profile in the C IV line, which argues for the presence of a hot (10{sup 5} K) wind. For the overall sample, the Si IV and N V line luminosities are correlated with the C IV line luminosities, although the relationship between Si IV and C IV shows large scatter about a linear relationship and suggests that TW Hya, V4046 Sgr, AA Tau, DF Tau, GM Aur, and V1190 Sco are silicon-poor, while CV Cha, DX Cha, RU Lup, and RW Aur may be silicon-rich.

Ardila, David R. [NASA Herschel Science Center, California Institute of Technology, MC 100-22, Pasadena, CA 91125 (United States); Herczeg, Gregory J. [Kavli Institute for Astronomy and Astrophysics, Peking University, Beijing 100871 (China); Gregory, Scott G.; Hillenbrand, Lynne A. [Cahill Center for Astronomy and Astrophysics, California Institute of Technology, MC 249-17, Pasadena, CA 91125 (United States); Ingleby, Laura; Bergin, Edwin; Bethell, Thomas; Calvet, Nuria [Department of Astronomy, University of Michigan, 830 Dennison Building, 500 Church Street, Ann Arbor, MI 48109 (United States); France, Kevin; Brown, Alexander [Center for Astrophysics and Space Astronomy, University of Colorado, Boulder, CO 80309-0389 (United States); Edwards, Suzan [Department of Astronomy, Smith College, Northampton, MA 01063 (United States); Johns-Krull, Christopher [Department of Physics and Astronomy, Rice University, Houston, TX 77005 (United States); Linsky, Jeffrey L. [JILA, University of Colorado and NIST, 440 UCB Boulder, CO 80309-0440 (United States); Yang, Hao [Institute for Astrophysics, Central China Normal University, Wuhan 430079 (China); Valenti, Jeff A. [Space Telescope Science Institute, 3700 San Martin Drive, Baltimore, MD 21218 (United States); Abgrall, Herve [LUTH and UMR 8102 du CNRS, Observatoire de Paris, Section de Meudon, Place J. Janssen, F-92195 Meudon (France); Alexander, Richard D. [Department of Physics and Astronomy, University of Leicester, University Road, Leicester LE1 7RH (United Kingdom); Brown, Joanna M.; Espaillat, Catherine [Harvard-Smithsonian Center for Astrophysics, 60 Garden Street, MS 78, Cambridge, MA 02138 (United States); Hussain, Gaitee, E-mail: ardila@ipac.caltech.edu [ESO, Karl-Schwarzschild-Strasse 2, D-85748 Garching bei Muenchen (Germany); and others

2013-07-01T23:59:59.000Z

340

On-site rubber lining -- Application of precured and self-curing rubber linings  

SciTech Connect

Rubber linings are applied as a corrosion protection system in a wide range of plants and installations of the industrial sector. In addition to the execution of lining works in a workshop, the on-site application of this corrosion protection system on the construction site has gained increasing importance. The various procedures utilized to apply the corrosion protection linings will be briefly presented in the following paper. In particular the precured and self curing rubber linings together with their scope of use and application on construction sites will be described in more detail.

Fenner, J. [Keramchemie GmbH, Siershahn (Germany)

1998-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

A high accuracy computed water line list  

E-Print Network (OSTI)

A computed list of H$_{2}$$^{16}$O infra-red transition frequencies and intensities is presented. The list, BT2, was produced using a discrete variable representation two-step approach for solving the rotation-vibration nuclear motions. It is the most complete water line list in existence, comprising over 500 million transitions (65% more than any other list) and it is also the most accurate (over 90% of all known experimental energy levels are within 0.3 cm$^{-1}$ of the BT2 values). Its accuracy has been confirmed by extensive testing against astronomical and laboratory data. The line list has been used to identify individual water lines in a variety of objects including: comets, sunspots, a brown dwarf and the nova-like object V838 Mon. Comparison of the observed intensities with those generated by BT2 enables physical values to be derived for these objects. The line list can also be used to provide an opacity for models of the atmospheres of M-dwarf stars and assign previously unknown water lines in laboratory spectra.

R. J. Barber; J. Tennyson; G. J. Harris; R. N. Tolchenov

2006-01-11T23:59:59.000Z

342

Quantification of line tracking solutions for automotive applications  

Science Journals Connector (OSTI)

Unlike line tracking in automotive painting applications, line tracking for automotive general assembly applications requires position tracking in order to perform assembly operations to a required assembly tolerance. Line tracking quantification experiments ... Keywords: position tracking performance

Jane Shi; Rick F. Rourke; Dave Groll; Peter W. Tavora

2008-08-01T23:59:59.000Z

343

Energy Jobs: Utility Line Worker | Department of Energy  

Energy Savers (EERE)

Utility Line Worker Energy Jobs: Utility Line Worker October 21, 2014 - 1:10pm Addthis Line workers get hands-on experience with an electrical pole as part of their training. |...

344

International reserves and swap lines: substitutes or complements?  

E-Print Network (OSTI)

Reserves, and Central Bank Swap Lines in the Panic of 2008."reserves and swap lines: substitutes or complements? *We explore whether such swap lines can reduce the need for

Aizenman, Joshua; Jinjarak, Yothin; Park, Donghyun

2010-01-01T23:59:59.000Z

345

International reserves and swap lines: substitutes or complements? *  

E-Print Network (OSTI)

Reserves, and Central Bank Swap Lines in the Panic of 2008."reserves and swap lines: substitutes or complements? *We explore whether such swap lines can reduce the need for

Aizenman, Joshua; Jinjarak, Yothin; PARK, Donghyun Dr.

2010-01-01T23:59:59.000Z

346

Injection and Extraction Lines for the ILC Damping Rings  

E-Print Network (OSTI)

INJECTION AND EXTRACTION LINES FOR THE ILC DAMPING RINGS ?the injection and extraction lines into and out of the ILCas the design for the abort line. Due to changes of the geo-

Reichel, Ina

2008-01-01T23:59:59.000Z

347

Mechanical Factors in the Excitation of Clupeid Lateral Lines  

Science Journals Connector (OSTI)

...Factors in the Excitation of Clupeid Lateral Lines E. J. Denton John Gray The excitation of lateral line sense organs (neuromasts) might be expected...between the liquid inside the main lateral line canals (the ones that contain the neuromasts...

1983-01-01T23:59:59.000Z

348

Prediction of epigenetically regulated genes in breast cancer cell lines  

E-Print Network (OSTI)

in breast cancer cell lines Leandro A. Loss ?1 , Angurajof breast cancer cell lines for the study of functionallyof 45 breast cancer cell lines, which is widely used in the

Loss, Leandro A

2010-01-01T23:59:59.000Z

349

MORPHOMETRIC SUBTYPING FOR A PANEL OF BREAST CANCER CELL LINES  

E-Print Network (OSTI)

the incubation of each line in the panel, which indicatespanel of breast cell lines were computed, and subpopulationsto a data set of 41 cell lines grown in 2D cell culture

Han, Ju

2009-01-01T23:59:59.000Z

350

Lines of Circular Polarization in Electromagnetic Wave Fields  

Science Journals Connector (OSTI)

8 October 1983 research-article Lines of Circular Polarization in Electromagnetic Wave Fields J...free space possesses, in general, two families of singular lines ( lines) on which the transverse field is circularly polarized. The...

1983-01-01T23:59:59.000Z

351

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines  

E-Print Network (OSTI)

Waveform Relaxation Technique for Longitudinal Partitioning of Transmission Lines Martin Gander problem for multiple coupled transmission lines by a so-called transverse partitioning technique. The WR mode transmission line problems. Previous longitudinal partitioning work using the classical WR

Gander, Martin J.

352

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES  

E-Print Network (OSTI)

MATHEMATICAL ANALYSIS OF CONDUCTING AND SUPERCONDUCTING TRANSMISSION LINES ANNE-SOPHIE BONNET propagation in the microstrip transmission lines used in microelectronics. In the first part, the case of the perfectly conducting strip. Key words. superconducting transmission lines, waveguides, spectral analysis

Ramdani, Karim - Institut de Mathématiques �lie Cartan, Université Henri Poincaré

353

ASYMMETRIC DIFFUSION OF MAGNETIC FIELD LINES  

SciTech Connect

Stochasticity of magnetic field lines is important for particle transport properties. Magnetic field lines separate faster than diffusively in turbulent plasma, which is called superdiffusion. We discovered that this superdiffusion is pronouncedly asymmetric, so that the separation of field lines along the magnetic field direction is different from the separation in the opposite direction. While the symmetry of the flow is broken by the so-called imbalance or cross-helicity, the difference between forward and backward diffusion is not directly due to imbalance, but a non-trivial consequence of both imbalance and non-reversibility of turbulence. The asymmetric diffusion perpendicular to the mean magnetic field entails a variety of new physical phenomena, such as the production of parallel particle streaming in the presence of perpendicular particle gradients. Such streaming and associated instabilities could be significant for particle transport in laboratory, space, and astrophysical plasmas.

Beresnyak, Andrey [Los Alamos National Laboratory, Los Alamos, NM 87545 (United States)

2013-04-20T23:59:59.000Z

354

Axial power loss along open field lines  

SciTech Connect

Studies are underway to evaluate the linear mirror geometry as a candidate for a high-fluence, neutron irradiation facility. This steady-state, low-Q design is currently perceived to comprise a two-component plasma driven by neutral beams with mirror confinement of the hot ions and with no electrostatic axial reduction in the warm ion end losses. Warm-ion fueling and end-wall power density will require substantial cold plasma exterior to the mirror cell and neutral gas near the end wall. In this paper, we evaluate to what extent the loss power parallel to the axial magnetic field along open field lines is a function of the escaping plasma and end-wall parameters. By allowing the source power to depend directly on the plasma density and electron temperature, several new conclusions may be pertinent to closed field-line geometries with open field-line divertors.

Correll, D.L.

1987-08-01T23:59:59.000Z

355

Dynamic Line Rating: Research and Policy Evaluation  

SciTech Connect

Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of electrical conductors to be increased based on local weather conditions. Overhead lines are conventionally given a conservative rating based on worst case scenarios. We demonstrate that observing the conditions in real time leads to additional capacity and safer operation. This paper provides a report of a pioneering scheme in the United States of America in which DLR has been applied. Thereby, we demonstrate that observing the local weather conditions in real time leads to additional capacity and safer operation. Secondly, we discuss limitations involved. In doing so, we arrive at novel insights which will inform and improve future DLR projects. Third, we provide a policy background and discussion to clarify the technology’s potential and identifies barriers to the imminent adoption of dynamic line rating systems. We provide suggestions for regulatory bodies about possible improvements in policy to encourage adoption of this beneficial technology.

Jake P. Gentle; Kurt S. Myers; Michael R. West

2014-07-01T23:59:59.000Z

356

Displaced Vertices from X-ray Lines  

E-Print Network (OSTI)

We present a simple model of weak-scale thermal dark matter that gives rise to X-ray lines. Dark matter consists of two nearly degenerate states near the weak scale, which are populated thermally in the early universe via co-annihilation with slightly heavier states that are charged under the Standard Model. The X-ray line arises from the decay of the heavier dark matter component into the lighter one via a radiative dipole transition, at a rate that is slow compared to the age of the universe. The model predicts observable signatures at the LHC in the form of exotic events with missing energy and displaced leptons and jets. As an application, we show how this model can explain the recently observed 3.55 keV X-ray line.

Adam Falkowski; Yonit Hochberg; Joshua T. Ruderman

2014-09-09T23:59:59.000Z

357

Electric Transmission Lines (Nebraska) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nebraska) Nebraska) Electric Transmission Lines (Nebraska) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Nebraska Program Type Siting and Permitting Provider Public Service Commission The Public Service Commission has jurisdiction over all electricity transmission lines crossing over or under railroad tracks at public highway

358

Neutral reactors on shunt compensated EHV lines  

SciTech Connect

This paper examines the applications of a neutral reactor in limiting resonance overvoltages induced on deenergized conductors due to parallel energized circuits and stuck breaker conditions. These applications are demonstrated through the planned 243 mile long Mead-Phoenix 500 kV line running on the same right of way as the existing Mead-Liberty 345 kV line. Reducing the secondary arc current during single pole reclosing is also examined. In addition to its applications, a procedure for sizing, rating and protection of the neutral reactor is explained.

Atmuri, S.R. [Teshmont Consultants Inc., Winnipeg, Manitoba (Canada); Thallam, R.S.; Gerlach, D.W.; Lundquist, T.G. [Salt River Project, Phoenix, AZ (United States); Selin, D.A. [Arizona Public Service Co., Phoenix, AZ (United States)

1994-12-31T23:59:59.000Z

359

Stark broadening of Kr UV spectral lines  

Science Journals Connector (OSTI)

This work reports new data for the Stark parameters of doubly ionized krypton spectral lines. Stark widths and shifts of Kr iii lines belonging to the UV region (245–300 nm) have been measured. A low-pressure pulsed arc, containing a mixture of 8% krypton and 92% helium, was used as a plasma source. Measured electron densities and electron temperatures were in the range (0.7–2.0)×1023 m-3 and 16 000–20 000 K, respectively. Experimentally obtained data were compared to theoretical results calculated using simplified modified semiempirical formulas.

M. ?irišan; R. J. Peláez; S. Djurovi?; J. A. Aparicio; S. Mar

2011-01-24T23:59:59.000Z

360

Open Wilson lines and group theory of  

Science Journals Connector (OSTI)

The correlation functions of open Wilson line operators in two-dimensional Yang-Mills theory on the noncommutative torus are computed exactly. The correlators are expressed in two equivalent forms. An instanton expansion involves only topological numbers of Heisenberg modules and enables extraction of the weak-coupling limit of the gauge theory. A dual algebraic expansion involves only group theoretic quantities, winding numbers and translational zero modes, and enables analysis of the strong-coupling limit of the gauge theory and the high-momentum behaviour of open Wilson lines. The dual expressions can be interpreted physically as exact sums over contributions from virtual electric dipole quanta.

Lori D. Paniak; Richard J. Szabo

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Straight-line separation of two polyhedra  

E-Print Network (OSTI)

STRAIGHT-LINE SEPARATION OF TWO POLYHEDRA A Thesis by SU-HUA WANG Submitted to the Office of Graduate Studies of Texas ARM University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE December 1992 Major Subject...: Computer Science STRAIGHT-LINE SEPARATION OF TWO POLYHEDRA A Thesis by SU-HUA WANG Approved as to style and content by: Jan Wolter hair of Committee) Donald K. Friesen (Member) esa O. alav ( ember) Richard A, Volz (Head of Department) December...

Wang, Su-Hua

1992-01-01T23:59:59.000Z

362

Ionization Chambers in the FLASH Dump Line  

E-Print Network (OSTI)

. 7, 2010FLASH Seminar, Dec. 7, 2010 BPM 13DUMP Dump Line Upgrade 2009Dump Line Upgrade 2009 BPM 9DUMP BPM 5DUMP Toroid 9DUMP OTR screen 9DUMP BLM 14DUMP BLM 13.1DUMP 13.2DUMP BLM 9DUMP BLM 6DUMP BLM 1.1DUMP 1.2DUMP BPM 10DUMP BPM 16DUMP 8 x BHM 16DUMP BLM 14R.DUMP 14L.DUMP 14U.DUMP 14D.DUMP Ionization

363

Boron-10 Lined Proportional Counter Wall Effects  

SciTech Connect

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project 'Coincidence Counting With Boron-Based Alternative Neutron Detection Technology' at Pacific Northwest National Laboratory (PNNL) for development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube based system in the configuration of a coincidence counter. This report provides information about how variations in proportional counter radius and gas pressure in a typical coincident counter design might affect the observed signal from boron-lined tubes. A discussion comparing tubes to parallel plate counters is also included.

Siciliano, Edward R.; Kouzes, Richard T.

2012-05-01T23:59:59.000Z

364

EC Transmission Line Risk Identification and Analysis  

SciTech Connect

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements) (2) Underperformance of prototype, first unit, or production components during testing (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

Bigelow, Tim S [ORNL

2012-04-01T23:59:59.000Z

365

EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Hot Springs to Anaconda Transmission Line Rebuild Project, Montana EIS-0502: Hot Springs to Anaconda Transmission Line Rebuild Project, Montana SUMMARY DOE's Bonneville Power...

366

EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell...  

Energy Savers (EERE)

1: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana EA-1961: Kalispell-Kerr Transmission Line Rebuild Project, Kalispell and Polson, Montana SUMMARY...

367

Mitsui O S K Lines Ltd | Open Energy Information  

Open Energy Info (EERE)

Lines Ltd Jump to: navigation, search Name: Mitsui O.S.K. Lines Ltd Place: Tokyo, Japan Zip: 1058688 Sector: Services Product: A shipping company, with services including...

368

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado EIS-0483: Estes to Flatiron Substation Transmission Lines Rebuild Project,...

369

Nonmonotone line search methods with variable sample size  

E-Print Network (OSTI)

The nonmonotone line search framework is embedded with a variable sample size ... the line search combines well with the variable sample size scheme as.

2014-02-17T23:59:59.000Z

370

Request for Information on Permitting of Transmission Lines:...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

371

Independent Oversight Evaluation of Line Self-Assessments of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluation of Line Self-Assessments of Safety Conscious Work Environment - February 2014 Independent Oversight Evaluation of Line Self-Assessments of Safety Conscious Work...

372

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild...  

Energy Savers (EERE)

EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon EA-1967: Hills Creek-Lookout Point Transmission Line Rebuild, Lane County, Oregon Summary...

373

Letter from Deputy Secretary Poneman to Clean Line Energy Regarding...  

Office of Environmental Management (EM)

Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Advance...

374

EIS-0499: Great Northern Transmission Line Project, Minnesota...  

Energy Savers (EERE)

EIS-0499: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota SUMMARY This EIS will evaluate the potential...

375

Amended Notice of Intent for the Northern Pass Transmission Line...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amended Notice of Intent for the Northern Pass Transmission Line Project Published in the Federal Register Amended Notice of Intent for the Northern Pass Transmission Line Project...

376

EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties,...

377

EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Alvey-Fairview Transmission Line Rebuild Project, Oregon EA-1891: Alvey-Fairview Transmission Line Rebuild Project, Oregon Summary Bonneville Power Administration prepared an EA...

378

Inbred lines of mice derived from long-term growth selected lines: unique resources for mapping growth genes  

Science Journals Connector (OSTI)

Lines of mice selected for many generations for ... have been collected, and from these, inbred lines are being developed by recurrent full-sib ... in Edinburgh. There are seven high selected lines and four low

Lutz Bünger; Anita Laidlaw; Grahame Bulfield; Eugene J. Eisen…

2001-09-01T23:59:59.000Z

379

Abstract--Power Line Communications (PLC) is used for information exchange over the lines  

E-Print Network (OSTI)

Abstract-- Power Line Communications (PLC) is used for information exchange over the lines installed for delivering the electrical power. Inhome PLC is a technology which delivers telecom services to every corner of a household through already existing electrical wiring. In recent years, PLC has emerged

Boyer, Edmond

380

The Mean Number of Extreme Lines in a Convex Hull of Lines  

Science Journals Connector (OSTI)

The dual problem of the mean number of extreme lines among n...chosen at random from a convex polygon of lines is defined, evaluations made for n=4 , 6, 20 and the asymptotic mean are shown to be the same as in t...

Gates

2002-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

MICROLENSING OF QUASAR BROAD EMISSION LINES: CONSTRAINTS ON BROAD LINE REGION SIZE  

SciTech Connect

We measure the differential microlensing of the broad emission lines between 18 quasar image pairs in 16 gravitational lenses. We find that the broad emission lines are in general weakly microlensed. The results show, at a modest level of confidence (1.8{sigma}), that high ionization lines such as C IV are more strongly microlensed than low ionization lines such as H{beta}, indicating that the high ionization line emission regions are more compact. If we statistically model the distribution of microlensing magnifications, we obtain estimates for the broad line region size of r{sub s} = 24{sup +22} {sub -15} and r{sub s} = 55{sup +150} {sub -35} lt-day (90% confidence) for the high and low ionization lines, respectively. When the samples are divided into higher and lower luminosity quasars, we find that the line emission regions of more luminous quasars are larger, with a slope consistent with the expected scaling from photoionization models. Our estimates also agree well with the results from local reveberation mapping studies.

Guerras, E.; Mediavilla, E. [Instituto de Astrofisica de Canarias, Via Lactea S/N, La Laguna E-38200, Tenerife (Spain)] [Instituto de Astrofisica de Canarias, Via Lactea S/N, La Laguna E-38200, Tenerife (Spain); Jimenez-Vicente, J. [Departamento de Fisica Teorica y del Cosmos, Universidad de Granada, Campus de Fuentenueva, E-18071 Granada (Spain)] [Departamento de Fisica Teorica y del Cosmos, Universidad de Granada, Campus de Fuentenueva, E-18071 Granada (Spain); Kochanek, C. S. [Department of Astronomy and the Center for Cosmology and Astroparticle Physics, The Ohio State University, 4055 McPherson Lab, 140 West 18th Avenue, Columbus, OH 43221 (United States)] [Department of Astronomy and the Center for Cosmology and Astroparticle Physics, The Ohio State University, 4055 McPherson Lab, 140 West 18th Avenue, Columbus, OH 43221 (United States); Munoz, J. A. [Departamento de Astronomia y Astrofisica, Universidad de Valencia, E-46100 Burjassot, Valencia (Spain)] [Departamento de Astronomia y Astrofisica, Universidad de Valencia, E-46100 Burjassot, Valencia (Spain); Falco, E. [Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States)] [Center for Astrophysics, 60 Garden Street, Cambridge, MA 02138 (United States); Motta, V. [Departamento de Fisica y Astronomia, Universidad de Valparaiso, Avda. Gran Bretana 1111, Valparaiso (Chile)] [Departamento de Fisica y Astronomia, Universidad de Valparaiso, Avda. Gran Bretana 1111, Valparaiso (Chile)

2013-02-20T23:59:59.000Z

382

Student On Line Access to Records Provides on-line, self service access to  

E-Print Network (OSTI)

SOLAR Student On Line Access to Records #12;Provides on-line, self service access to: Registrar Enrollment Appointments · Review Solar Messages Student Account/ Financial Aid: · View Support offered (available aid ­ i.e. Federal loans, scholarships, etc.) · Accept financial aid (i.e. loans, etc.) ­ loan

383

Berkeley Off-line Radioisotope Generator (BORG)  

SciTech Connect

Development of chemical separations for the transactinides has traditionally been performed with longer-lived tracer activities purchased commercially. With these long-lived tracers, there is always the potential problem that the tracer atoms are not always in the same chemical form as the short-lived atoms produced in on-line experiments. This problem is especially severe for elements in groups 4 and 5 of the periodic table, where hydrolysis is present. The long-lived tracers usually are stored with a complexing agent to prevent sorption or precipitation. Chemistry experiments performed with these long-lived tracers are therefore not analogous to those chemical experiments performed in on-line experiments. One way to eliminate the differences between off-line and on-line chemistry experiments is through the use of a {sup 252}Cf fission fragment collection device. A {sup 252}Cf fission fragment collection device has already been constructed [1]. This device is limited in its capabilities. A new fission fragment device would allow the study of the chemical properties of the homologues of the heaviest elements. This new device would be capable of producing fission fragments for fast gas chemistry and aqueous chemistry experiments, long-lived tracers for model system development and neutrons for neutron activation. Fission fragment activities produced in this way should have the same chemical form as those produced in Cyclotron irradiations. The simple operation of this source will allow more rapid and reliable development of radiochemical separations with homologues of transactinide elements.

Sudowe, Ralf; Patin, Joshua B.

2001-07-23T23:59:59.000Z

384

High temperature lined conduits, elbows and tees  

DOE Patents (OSTI)

A high temperature lined conduit comprising, a liner, a flexible insulating refractory blanket around and in contact with the liner, a pipe member around the blanket and spaced therefrom, and castable rigid refractory material between the pipe member and the blanket. Anchors are connected to the inside diameter of the pipe and extend into the castable material. The liner includes male and female slip joint ends for permitting thermal expansion of the liner with respect to the castable material and the pipe member. Elbows and tees of the lined conduit comprise an elbow liner wrapped with insulating refractory blanket material around which is disposed a spaced elbow pipe member with castable refractory material between the blanket material and the elbow pipe member. A reinforcing band is connected to the elbow liner at an intermediate location thereon from which extend a plurality of hollow tubes or pins which extend into the castable material to anchor the lined elbow and permit thermal expansion. A method of fabricating the high temperature lined conduit, elbows and tees is also disclosed which utilizes a polyethylene layer over the refractory blanket after it has been compressed to maintain the refractory blanket in a compressed condition until the castable material is in place. Hot gases are then directed through the interior of the liner for evaporating the polyethylene and setting the castable material which permits the compressed blanket to come into close contact with the castable material.

De Feo, Angelo (Passaic, NJ); Drewniany, Edward (Bergen, NJ)

1982-01-01T23:59:59.000Z

385

House Rejects Southern Idaho Power Line  

Science Journals Connector (OSTI)

The House of Representatives has refused to go along with the Bonneville Power Administration's plans to build a power transmission line into southern Idaho, where Monsanto hopes to use part of the power in a planned expansion of its elemental phosphorus ...

1964-06-22T23:59:59.000Z

386

Holomorphic Structures on the Quantum Projective Line  

Science Journals Connector (OSTI)

......Projective Line Masoud Khalkhali 1 Giovanni Landi 2 3 Walter Daniel van Suijlekom 4 Correspondence to be sent to: waltervs@math...Modern Physics Letters A (2003) 18:2371-80. 13 Dubois-Violette M. , Masson T. On the first-order operators in bimodules......

Masoud Khalkhali; Giovanni Landi; Walter Daniël van Suijlekom

2011-01-01T23:59:59.000Z

387

Experiments on Magnetic-Field-Line Reconnection  

Science Journals Connector (OSTI)

In a very large laboratory plasma the process of magnetic-field-line reconnection has been diagnosed carefully. The temporal evolution of a narrow (?3c?pe) neutral layer with Petschek slow shocks is observed. Electrostatic fields are found to be as important as induced electric fields.

R. L. Stenzel and W. Gekelman

1979-04-16T23:59:59.000Z

388

Vortex lines in films: Fields and interactions  

Science Journals Connector (OSTI)

General expressions are given for the magnetic field and energy of arbitrary arrangements of straight and curved vortices in an anisotropic superconductor film of finite thickness within anisotropic London theory. As examples we consider the magnetic field and interaction of straight perpendicular vortex lines in films of finite thickness.

Gilson Carneiro and Ernst Helmut Brandt

2000-03-01T23:59:59.000Z

389

The Bottom Line Space@Penn Upgrade  

E-Print Network (OSTI)

The Bottom Line Space@Penn Upgrade Coming Soon! A project is underway to upgrade the current that allows designated users in the field to update certain elements of their space. This project, whose: Grants & Projects ­ Used for invoice generation, overhead and revenue recognition, and award and project

Sharp, Kim

390

Supersonic line broadening in accretion discs  

Science Journals Connector (OSTI)

......Dhillon the dwarf nova 0 Y Car (Home et al. 1994...ions will be in the lower energy state, and therefore...iron curtain' in OY Car (Home et al. 1994...perhaps the most obvious alternative. Ifwe assume that the...spectra of the dwarf nova OY Car suggest that the line......

T. R. Marsh; V. S. Dhillon

1997-12-01T23:59:59.000Z

391

Connecticut ponders fuel cells for rail line  

Science Journals Connector (OSTI)

The Connecticut Department of Transportation is studying how fuel cell technology could be used to power trains and stations on Metro-North Railroad's New Haven Line. According to a report in The Stamford Advocate, the DOT wants to determine whether a fuel cell power station could replace some of the electric substations now used, taking the strain off Fairfield County's power grid.

2007-01-01T23:59:59.000Z

392

Dielectronic recombination lines of C{sup +}  

SciTech Connect

The present paper presents atomic data generated to investigate the recombination lines of C II in the spectra of planetary nebulae. These data include energies of bound and autoionizing states, oscillator strengths and radiative transition probabilities, autoionization probabilities, and recombination coefficients. The R-matrix method of electron scattering theory was used to describe the C{sup 2+} plus electron system.

Sochi, Taha, E-mail: taha.sochi@kcl.ac.uk; Storey, Peter J.

2013-11-15T23:59:59.000Z

393

Molecular Evolutionary Analysis of Cancer Cell Lines  

Science Journals Connector (OSTI)

...flow diagram of the DNA sequence analysis pipeline. For the cell lines we sequenced, comparisons...manner as a consequence of impaired DNA repair and apoptosis processes). Evolutionary...47-55. 49 Varley KE , Mitra RD. Nested Patch PCR enables highly multiplexed mutation...

Yan Zhang; Michael J. Italia; Kurt R. Auger; Wendy S. Halsey; Stephanie F. Van Horn; Ganesh M. Sathe; Michal Magid-Slav; James R. Brown; and Joanna D. Holbrook

2010-02-01T23:59:59.000Z

394

Tassel Pipeline Tutorial (Command Line Interface)  

E-Print Network (OSTI)

Tassel Pipeline Tutorial (Command Line Interface) Terry Casstevens Institute for Genomic Diversity, Cornell University May 11, 2011 #12;Tassel Pipeline Basics... · Consists of Modules (i.e. Plugins) · Output from one Module can be Input to another Module. Determined by order specified. run_pipeline

Buckler, Edward S.

395

Entropy Adaptive On-Line Compression  

Science Journals Connector (OSTI)

Self-Organization is based on adaptivity. Adaptivity should start with the very basic fundamental communication tasks such as encoding the information to be transmitted or stored. Obviously, the less signal transmitted the less energy in transmission ... Keywords: On-line compression, adaptive compression

Shlomi Dolev, Sergey Frenkel, Marina Kopeetsky

2014-08-01T23:59:59.000Z

396

CX-008818: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Utility Corridor Extension CX(s) Applied: B4.7, B4.11, B5.2, B5.5 Date: 06/13/2012 Location(s): Pennsylvania Offices(s): Naval Nuclear Propulsion Program, Bettis Site

397

LINE-INTERLOCKING EFFECTS ON POLARIZATION IN SPECTRAL LINES BY RAYLEIGH AND RAMAN SCATTERING  

SciTech Connect

The polarized spectrum of the Sun and stars is formed from the scattering of anisotropic radiation on atoms. Interpretation of this spectrum requires the solution of polarized line transfer in multilevel atomic systems. While sophisticated quantum theories of polarized line formation in multilevel atomic systems exist, they are limited by the approximation of complete frequency redistribution in scattering. The partial frequency redistribution (PRD) in line scattering is a necessary component in modeling the polarized spectra of strong lines. The polarized PRD line scattering theories developed so far confine themselves to a two-level or a two-term atom model. In this paper, we present a heuristic approach to the problem of polarized line formation in multilevel atoms taking into account the effects of PRD and a weak magnetic field. Starting from the unpolarized PRD multilevel atom approach of Hubeny et al., we incorporate the polarization state of the radiation field. However, the lower level polarization is neglected. Two iterative methods of solving the polarized PRD line transfer in multilevel atoms are also presented. Taking the example of a five-level Ca II atom model, we present illustrative results for an isothermal one-dimensional model atmosphere.

Sampoorna, M.; Nagendra, K. N. [Indian Institute of Astrophysics, Koramangala, Bangalore 560 034 (India); Stenflo, J. O., E-mail: sampoorna@iiap.res.in, E-mail: knn@iiap.res.in, E-mail: stenflo@astro.phys.ethz.ch [Institute of Astronomy, ETH Zurich, CH-8093 Zurich (Switzerland)

2013-06-20T23:59:59.000Z

398

Visual Resource Report  

NLE Websites -- All DOE Office Websites (Extended Search)

the I-5 Corridor Reinforcement Project (project). The Bonneville Power Administration (BPA) proposes to construct a new 500-kV transmission line in a northsouth alignment...

399

Work continues on SIF | The Ames Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

of the six instrument bays are lined with aluminum to eliminate potential electromagnetic interference. The service corridor will also house separate HVAC units to closely...

400

A CURRENT CONTROLLED VARIABLE DELAY SUPERCONDUCTING TRANSMISSION LINE  

E-Print Network (OSTI)

I I I I 1388 A CURRENT CONTROLLED VARIABLE DELAY SUPERCONDUCTING TRANSMISSION LINE S. M. Anlage, H line. The device makes use of the change in kinetic inductance of a superconducting transmission line, fabrication of transmission lines with such films provides the means for constructing a continuously variable

Anlage, Steven

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Exponential asymptotics and Stokes lines in a partial differential equation  

Science Journals Connector (OSTI)

...higher-order Stokes line. exponential asymptotics|Stokes lines|Stokes smoothing|Borel plane...and subdominant exponentials may be identified...this expansion and smoothing the Stokes lines...performed the Stokes smoothing and identified...Stokes lines and the exponentials they switch on...

2005-01-01T23:59:59.000Z

402

FTA- SunLine Transit Agency- Final Report  

Energy.gov (U.S. Department of Energy (DOE))

Final Report on the Federal Transit Administration, SunLine Transit Agency Cooperative Agreement (Part One)

403

http://sunearthday.nasa.gov Exploring Magnetic Field Lines  

E-Print Network (OSTI)

http://sunearthday.nasa.gov Exploring Magnetic Field Lines About this Activity When discussing". Left: Two participants tracing magnetic field lines. Below: Magnetic field line tracings of a bar more field lines. Public Outreach - Make and Take Activities What You'll Need Alnico bar magnets 1

404

CX-011183: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Determination CX-011183: Categorical Exclusion Determination Line Upgrade on Bonneville Power Administration's Walla Walla-Pendleton Number 1 Transmission Line CX(s) Applied: B1.3...

405

CX-011717: Categorical Exclusion Determination | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX-011717: Categorical Exclusion Determination Line 3002 and 3002A Electrical Transmission Line Reconductoring Project CX(s) Applied: B2.5 Date: 05222013 Location(s):...

406

Comparing the performace of f1 testers versus their inbred line parents in evaluating experimental sorghum b and r lines in testcrosses.  

E-Print Network (OSTI)

An appropriate tester correctly identifies the relative performance of experimental lines while maximizing the differences between lines. Most sorghum breeding programs use elite inbred lines testers. Inbred line testers evaluate experimental lines...

Packer, Daniel Jacob

2009-05-15T23:59:59.000Z

407

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) 2013 Annual Planning Summary for the Southwestern Area Power Administration

408

EPR Line Shifts and Line Shape Changes due to Spin Exchange of Nitroxide Free Radicals in Liquids: 6. Separating Line Broadening due to Spin Exchange and Dipolar Interactions  

E-Print Network (OSTI)

EPR Line Shifts and Line Shape Changes due to Spin Exchange of Nitroxide Free Radicals in Liquids 23, 2008; ReVised Manuscript ReceiVed: January 12, 2009 EPR spectra of perdeuterated 2

Bales, Barney

409

Definition: Line Transformer Monitors | Open Energy Information  

Open Energy Info (EERE)

Transformer Monitors Transformer Monitors Jump to: navigation, search Dictionary.png Line Transformer Monitors Transformer Monitoring System can monitor different aspects of transformers, including oil levels and multiple temperatures within the transformer. This allows for analysis of the health of either individual key power transformers or multiple power transformers networked in the system. For example, the transformer monitors provide transformer oil dissolved gas analysis (DGA), oil temperature, ambient temperature, and moisture in oil measurements. These measurements are made in relation to transformer load.[1] Related Terms transformer, system, transformer References ↑ https://www.smartgrid.gov/category/technology/line_transformer_monitors [[Cat LikeLike UnlikeLike You like this.Sign Up to see what your friends like.

410

LINE Commission Visits Idaho National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

LINE Commission Visits Idaho National Laboratory Members of the state of Idaho�s Leadership in Nuclear Energy (LINE) Commission recently visited the Idaho National Laboratory and related DOE-Idaho cleanup facilities. These photos show commission members at the Materials and Fuels Complex, where Steve Marschman from INL talks to the commission members, and the Advanced Mixed Waste Treatment Facility. At the AMWTP, members saw the supercompactor as Facility Manager Jeremy Hampton explained how it worked. Participants included, from top right in the INL: INL Laboratory Director John Grossenbacher; North Wind Group President Sylvia Median; former Idaho U.S. Senator Larry Craig; Idaho Department of Labor�s Dwight Johnson; BEA Government Affairs Boise Manager Brian Whitlock; and Idaho House District 33 Rep. Jeff Thompson.

411

Multi-transmission-line-beam interactive system  

SciTech Connect

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube due to J. R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Figotin, Alexander; Reyes, Guillermo [Department of Mathematics, University of California at Irvine, Irvine, California 92697-3875 (United States)] [Department of Mathematics, University of California at Irvine, Irvine, California 92697-3875 (United States)

2013-11-15T23:59:59.000Z

412

Boron-10 Lined Proportional Counter Model Validation  

SciTech Connect

The Department of Energy Office of Nuclear Safeguards (NA-241) is supporting the project “Coincidence Counting With Boron-Based Alternative Neutron Detection Technology” at Pacific Northwest National Laboratory (PNNL) for the development of an alternative neutron coincidence counter. The goal of this project is to design, build and demonstrate a boron-lined proportional tube-based alternative system in the configuration of a coincidence counter. This report discusses the validation studies performed to establish the degree of accuracy of the computer modeling methods current used to simulate the response of boron-lined tubes. This is the precursor to developing models for the uranium neutron coincidence collar under Task 2 of this project.

Lintereur, Azaree T.; Siciliano, Edward R.; Kouzes, Richard T.

2012-06-30T23:59:59.000Z

413

Reliability of lightning resistant overhead distribution lines  

SciTech Connect

An assessment of the 32 year historical reliability of the 13.8 kV electrical distribution system at the Oak Ridge National Laboratory (ORNL) in Tennessee has yielded several conclusions useful In the planning of Industrial power Systems. The system configuration at ORNL has essentially remained unchanged in the last 32 years which allows a meaningful comparison of reliability trends for the plant`s eight overhead distribution lines, two of which were built in the 1960`s with lightning resistant construction techniques. Meticulous records indicating the cause, duration, and location of 135 electric outages in the plant`s distribution system have allowed a reliability assessment to be performed. The assessment clearly shows how differences in voltage construction class, length, age, and maximum elevation above a reference elevation influence the reliability of overhead power distribution lines. Comparisons are also made between the ORNL historical data and predicted failure rates from ANSI and IEEE industry surveys.

Tolbert, L.M.; Cleveland, J.T.; Degenhardt, L.J.

1995-04-01T23:59:59.000Z

414

ADHM Revisited: Instantons and Wilson Lines  

E-Print Network (OSTI)

We revisit the well-studied D0-D4 system of D-branes and its relationship to the ADHM construction. It is well known that the D0-branes appear as instantons in the D4-brane worldvolume. We add a Wilson line to the D4-brane in the guise of an extended fundamental string and determine how this affects the D0-brane dynamics. As the D0-brane moves in the presence of the Wilson line, it experiences a Lorentz force, proportional to its Yang-Mills gauge connection. From the perspective of the D0-brane quantum mechanics, this force emerges through the ADHM construction of the self-dual gauge connection.

David Tong; Kenny Wong

2014-10-30T23:59:59.000Z

415

Optimising Shewhart charts in parallel production lines  

Science Journals Connector (OSTI)

I describe a methodology for optimising n Shewhart x-charts operating on parallel production lines in a factory. The goal is to maximise the factory-wide probability of detecting an out-of-control condition subject to a constraint on the expected number of false signals. I use non-linear programming to appropriately set the x-charts' control limits incorporating information about the probability of each production line going out-of-control. Using this approach, factories can set their quality control systems to optimally detect out-of-control conditions. Given some distributional assumptions, I also present a one-dimensional optimisation methodology that allows for the efficient optimisation of very large factories.

Ronald D. Fricker; Jr."> Jr.

2009-01-01T23:59:59.000Z

416

Giant vacuum forces via transmission lines  

E-Print Network (OSTI)

Quantum electromagnetic fluctuations induce forces between neutral particles, known as the van der Waals (vdW) and Casimir interactions. These fundamental forces, mediated by virtual photons from the vacuum, play an important role in basic physics and chemistry, and in emerging technologies involving, e.g. micro-electromechanical systems or quantum information processing. Here we show that these interactions can be enhanced by many orders of magnitude upon changing the character of the mediating vacuum-modes. By considering two polarizable particles in the vicinity of any standard electric transmission line, along which photons can propagate in one dimension (1d), we find a much stronger and longer-range interaction than in free-space. This enhancement may have profound implications on many-particle and bulk systems, and impact the quantum technologies mentioned above. The predicted giant vacuum force is estimated to be measurable in a coplanar waveguide line.

Ephraim Shahmoon; Igor Mazets; Gershon Kurizki

2013-04-07T23:59:59.000Z

417

Multi-transmission-line-beam interactive system  

E-Print Network (OSTI)

We construct here a Lagrangian field formulation for a system consisting of an electron beam interacting with a slow-wave structure modeled by a possibly non-uniform multiple transmission line (MTL). In the case of a single line we recover the linear model of a traveling wave tube (TWT) due to J.R. Pierce. Since a properly chosen MTL can approximate a real waveguide structure with any desired accuracy, the proposed model can be used in particular for design optimization. Furthermore, the Lagrangian formulation provides for: (i) a clear identification of the mathematical source of amplification, (ii) exact expressions for the conserved energy and its flux distributions obtained from the Noether theorem. In the case of uniform MTLs we carry out an exhaustive analysis of eigenmodes and find sharp conditions on the parameters of the system to provide for amplifying regimes.

Alexander Figotin; Guillermo Reyes

2013-04-19T23:59:59.000Z

418

Marathon pipe line's new control system  

SciTech Connect

A new control system for Marathon Pipe Line Company's 4200 mile long oil pipeline is described. The pipeline transports 1 1/2 million barrels/day of crude oil and refined products. A comprehensive, centralized computer control system in Findlay, Ohio was developed to provide precision control of the system. Marathon is almost finished with the supervisory control and data acquisition system which can almost instantaneously control fluid movements throughout the network with the push of a few buttons.

Ross, J.

1983-03-01T23:59:59.000Z

419

Forms and Determinant Lines Simon Scott  

E-Print Network (OSTI)

has discrete spectrum {(n + )2 , (n - )2 : n N}, where u = e2i satisfies u2 (1 + |z|2 ) + 2u(z + z Forms and Determinant Lines Simon Scott 1 Introduction The purpose here is to give a direct (M) Hi-2 (Y ) is integration over the fibres. That is, with = c1(T) ch(Ind (m)) = f em · 1 - e

Bushnell, Colin J.

420

New Diagnostics in the FLASH Dump Line  

E-Print Network (OSTI)

Line Status Aug. 2009 BPM 9DUMP BPM 15DUMP BPM 5DUMP Toroid 9DUMP OTR screen 9DUMP BLM 14DUMP BLM 13 at the dump #12;N. Baboi, MDIN. Baboi, MDI FLASH Seminar, Dec. 1, 2009FLASH Seminar, Dec. 1, 2009 Old BPM 15DUMPOld BPM 15DUMP ·Strange behavior of BPM signals measured impedance from end of cable (in bld. 49): L

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Transmission line environmental assessment guidance document  

SciTech Connect

Since 1939, U.S. utility companies have been required to obtain a Presidential Permit to construct electric transmission lines that cross a U.S. border and connect with a foreign utility. The purpose of this document is to provide Presidential Permit applicants with two types of guidance: (1) on the type of environmental and project descriptive information needed to assess the potential impacts of the proposed and alternative actions and (2) on compliance with applicable federal and state regulations. The main three chapters present information on the purpose and content of this document (Chapter 1); legislative, regulatory, and consultation requirements for transmission line interconnect projects (Chapter 2); and identification of basic transmission system design parameters and environmental data requirements for analysis of potential impacts of the proposed action (Chapter 3). Chapter 3 also includes information on possible techniques or measures to mitigate impacts. Appendix A presents an overview of NEPA requirements and DOE`s implementing procedures. Appendix B summarizes information on legislation that may be applicable to transmission line projects proposed in Presidential Permit applications.

Jackson, J.; Pentecost, E.; Muzzarelli, J.

1994-01-01T23:59:59.000Z

422

ICE LINES IN CIRCUMBINARY PROTOPLANETARY DISKS  

SciTech Connect

I examine the position of the ice line in circumbinary disks heated by steady mass accretion and stellar irradiation and compare with the critical semimajor axis, interior to which planetary orbits are unstable. There is a critical binary separation, dependent on the binary parameters and disk properties, for which binaries with separations larger than this critical value have ice lines that lie interior to the boundary of stability. For an equal-mass binary comprised of 1 M{sub Sun} components, this critical separation is Almost-Equal-To 1.04 AU, and scales weakly with mass accretion rate and Rosseland mean opacity ({proportional_to}[ M-dot {kappa}{sub R}]{sup 2/9}). Assuming a steady mass accretion rate of M-dot {approx}10{sup -8} M{sub Sun} yr{sup -1} and a Rosseland mean opacity of {kappa}{sub R} {approx} 1 cm{sup 2} g{sup -1}, I show that {approx}> 80% of all binary systems with component masses M{sub *} {approx}< 2.0 M{sub Sun} have ice lines that lie interior to the critical semimajor axis. This suggests that rocky planets should not form in these systems, a prediction which can be tested by looking for planets around binaries with separations larger than the critical separation with Kepler (difficult) and with microlensing.

Clanton, Christian, E-mail: clanton@astronomy.ohio-state.edu [Department of Astronomy, Ohio State University, 140 W. 18th Ave., Columbus, OH 43210 (United States)

2013-05-01T23:59:59.000Z

423

Stand-off transmission lines and method for making same  

DOE Patents (OSTI)

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress. 16 figures.

Tuckerman, D.B.

1991-05-21T23:59:59.000Z

424

Stand-off transmission lines and method for making same  

DOE Patents (OSTI)

Standoff transmission lines in an integrated circuit structure are formed by etching away or removing the portion of the dielectric layer separating the microstrip metal lines and the ground plane from the regions that are not under the lines. The microstrip lines can be fabricated by a subtractive process of etching a metal layer, an additive process of direct laser writing fine lines followed by plating up the lines or a subtractive/additive process in which a trench is etched over a nucleation layer and the wire is electrolytically deposited. Microstrip lines supported on freestanding posts of dielectric material surrounded by air gaps are produced. The average dielectric constant between the lines and ground plane is reduced, resulting in higher characteristic impedance, less crosstalk between lines, increased signal propagation velocities, and reduced wafer stress.

Tuckerman, David B. (Livermore, CA)

1991-01-01T23:59:59.000Z

425

Categorical Exclusion Determinations: Georgia | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 3, 2012 May 3, 2012 CX-008190: Categorical Exclusion Determination Georgia City-Sandy Springs CX(s) Applied: A1, B1.32, B3.6, B5.1 Date: 05/03/2012 Location(s): Georgia Offices(s): Energy Efficiency and Renewable Energy April 25, 2012 CX-008306: Categorical Exclusion Determination Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 04/25/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory April 18, 2012 CX-008315: Categorical Exclusion Determination Installation of Retail Biofuel Infrastructure Supporting I-75 Green Corridor Project CX(s) Applied: A1, B5.22 Date: 04/18/2012 Location(s): Georgia Offices(s): National Energy Technology Laboratory February 17, 2012 CX-007812: Categorical Exclusion Determination

426

Categorical Exclusion Determinations: Office of Electricity Delivery and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 4, 2010 November 4, 2010 CX-004397: Categorical Exclusion Determination The Padlock Project CX(s) Applied: A1, A9, A11, B1.2, B1.7 Date: 11/04/2010 Location(s): Pullman, Washington Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory October 27, 2010 CX-004331: Categorical Exclusion Determination Long Island Smart Energy Corridor CX(s) Applied: A1, A9, A11 Date: 10/27/2010 Location(s): Stony Brook, New York Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory October 27, 2010 CX-004330: Categorical Exclusion Determination Long Island Smart Energy Corridor CX(s) Applied: A9, A11, B3.6, B4.4, B5.1 Date: 10/27/2010 Location(s): Farmingdale, New York Office(s): Electricity Delivery and Energy Reliability, National Energy

427

Categorical Exclusion Determinations: A11 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 29, 2010 October 29, 2010 CX-004327: Categorical Exclusion Determination Retrofitting for Energy Efficiency - Biofuels Center of North Carolina CX(s) Applied: A9, A11, B1.24, B1.31, B2.2, B5.1 Date: 10/29/2010 Location(s): Oxford, North Carolina Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory October 27, 2010 CX-004331: Categorical Exclusion Determination Long Island Smart Energy Corridor CX(s) Applied: A1, A9, A11 Date: 10/27/2010 Location(s): Stony Brook, New York Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory October 27, 2010 CX-004330: Categorical Exclusion Determination Long Island Smart Energy Corridor CX(s) Applied: A9, A11, B3.6, B4.4, B5.1 Date: 10/27/2010 Location(s): Farmingdale, New York

428

Categorical Exclusion Determinations: National Energy Technology Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2010 0, 2010 CX-002626: Categorical Exclusion Determination Midwest Region Alternative Fuels Project CX(s) Applied: A7, B5.1 Date: 06/10/2010 Location(s): Kansas City, Kansas Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 10, 2010 CX-002625: Categorical Exclusion Determination Pennsylvania E85 Corridor Project - Sheetz Gas Station/Store #191 CX(s) Applied: B5.1 Date: 06/10/2010 Location(s): Carlisle, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory June 10, 2010 CX-002622: Categorical Exclusion Determination Pennsylvania E85 Corridor Project - Sheetz Gas Station/Store #426 CX(s) Applied: B5.1 Date: 06/10/2010 Location(s): Carlisle, Pennsylvania Office(s): Energy Efficiency and Renewable Energy, National Energy

429

PUMPING UP THE [N I] NEBULAR LINES  

SciTech Connect

The optical [N I] doublet near 5200 A is anomalously strong in a variety of emission-line objects. We compute a detailed photoionization model and use it to show that pumping by far-ultraviolet (FUV) stellar radiation previously posited as a general explanation applies to the Orion Nebula (M42) and its companion M43; but, it is unlikely to explain planetary nebulae and supernova remnants. Our models establish that the observed nearly constant equivalent width of [N I] with respect to the dust-scattered stellar continuum depends primarily on three factors: the FUV to visual-band flux ratio of the stellar population, the optical properties of the dust, and the line broadening where the pumping occurs. In contrast, the intensity ratio [N I]/H{beta} depends primarily on the FUV to extreme-ultraviolet ratio, which varies strongly with the spectral type of the exciting star. This is consistent with the observed difference of a factor of five between M42 and M43, which are excited by an O7 and B0.5 star, respectively. We derive a non-thermal broadening of order 5 km s{sup -1} for the [N I] pumping zone and show that the broadening mechanism must be different from the large-scale turbulent motions that have been suggested to explain the line widths in this H II region. A mechanism is required that operates at scales of a few astronomical units, which may be driven by thermal instabilities of neutral gas in the range 1000-3000 K. In an Appendix A, we describe how collisional and radiative processes are treated in the detailed model N I atom now included in the CLOUDY plasma code.

Ferland, G. J.; Porter, R. L. [Department of Physics, University of Kentucky, Lexington, KY 40506 (United States); Henney, W. J. [Centro de Radioastronomia y Astrofisica, UNAM Campus Morelia, Apartado Postal 3-72, 58090 Morelia, Michoacan (Mexico); O'Dell, C. R. [Department of Physics and Astronomy, Vanderbilt University, Box 1807-B, Nashville, TN 37235 (United States); Van Hoof, P. A. M. [Royal Observatory of Belgium, Ringlaan 3, 1180 Brussels (Belgium); Williams, R. J. R. [AWE plc, Aldermaston, Reading RG7 4PR (United Kingdom)

2012-09-20T23:59:59.000Z

430

Discontinuities in transmission lines and wave guides  

E-Print Network (OSTI)

IN THANSMISSION LINES AND ltrAVEGLIDES By Harold Fletcher Mathis A Thesis Submitted to the Graduate School of the Agricultural and Mechanical College of Texas in partial fulfillment of the requirements for the aegree of ELECTRICAL ENGIN~ May 1952 Major... s component to perform a pecific function and 1ts input impedance is not the proper v lue to give no discon- t1nuity, For example, an antenna which is to be fed by a 52-ohm coaxial cable is designed to give a desired red 1st ion pattern, but 1ts input...

Mathis, Harold Fletcher

2012-06-07T23:59:59.000Z

431

Speed-line for 3D animation  

E-Print Network (OSTI)

Committee Members, Carol LaFayette John Keyser Head of Department, Mardelle Shepley December 2005 Major Subject: Visualization Sciences iii ABSTRACT Speed-Line for 3D Animation. (December 2005) Won Chan Song, B.F.A., Ringling School of Art and Design Chair... to thank my committee members, Prof. Carol LaFayette and Dr. John Keyser for their advice and feedback. My gratitude also goes to Hobart Chan for letting me borrow his car model, which saved me a huge amount of time when I was making an animation as a...

Song, Won Chan

2007-04-25T23:59:59.000Z

432

Performance evaluation of mixed model assembly lines  

Science Journals Connector (OSTI)

Performance evaluation for a Mixed Model Assembly Line Balancing Problem is complicated as a multitude of factors affect operational objectives while the objectives themselves can not be represented easily. This paper reports a study of the effect of four factors namely number of workstations, number of models, demand pattern and stochastic variability of task times on performance measures used for representing the operational objectives. Analysis of Variance and Signal to Noise (S/N) ratio have been used to evaluate the ability of performance measures in representing the operational objectives and to identify the impact of the factors/interactions on the behaviour of performance measures.

Jonnalagedda V.L. Venkatesh; Balaji M. Dabade

2010-01-01T23:59:59.000Z

433

Transmission line including support means with barriers  

DOE Patents (OSTI)

A gas insulated transmission line includes an elongated outer sheath, a plurality of inner conductors disposed within and extending along the outer sheath, and an insulating gas which electrically insulates the inner conductors from the outer sheath. A support insulator insulatably supports the inner conductors within the outer sheath, with the support insulator comprising a main body portion including a plurality of legs extending to the outer sheath, and barrier portions which extend between the legs. The barrier portions have openings therein adjacent the main body portion through which the inner conductors extend.

Cookson, Alan H. (Pittsburgh, PA)

1982-01-01T23:59:59.000Z

434

Transmission line route selection by goal programming  

Science Journals Connector (OSTI)

A two-stage solution for transmission line route selection is presented. The generalized double-sweep method has been used to select the K least costly routes. The selected routes are subjected to social and environmental constraints (SEC). The SEC problem is formulated as a zero-one goal-programming model and solved by the implicit enumeration method. The two-stage solution algorithm has been applied to two problems. The results indicate the suitability of the method for route selection provided that acceptable SEC criteria can be found. The results also indicate the viability of the goal-programming technique for choosing power network interconnection concepts.

I.M. Elamin; S.O. Duffuaa; H.A. Yassein

1990-01-01T23:59:59.000Z

435

Comparing the performace of f1 testers versus their inbred line parents in evaluating experimental sorghum b and r lines in testcrosses.  

E-Print Network (OSTI)

??An appropriate tester correctly identifies the relative performance of experimental lines while maximizing the differences between lines. Most sorghum breeding programs use elite inbred lines… (more)

Packer, Daniel Jacob

2009-01-01T23:59:59.000Z

436

Control of stochasticity in magnetic field lines  

E-Print Network (OSTI)

We present a method of control which is able to create barriers to magnetic field line diffusion by a small modification of the magnetic perturbation. This method of control is based on a localized control of chaos in Hamiltonian systems. The aim is to modify the perturbation locally by a small control term which creates invariant tori acting as barriers to diffusion for Hamiltonian systems with two degrees of freedom. The location of the invariant torus is enforced in the vicinity of the chosen target. Given the importance of confinement in magnetic fusion devices, the method is applied to two examples with a loss of magnetic confinement. In the case of locked tearing modes, an invariant torus can be restored that aims at showing the current quench and therefore the generation of runaway electrons. In the second case, the method is applied to the control of stochastic boundaries allowing one to define a transport barrier within the stochastic boundary and therefore to monitor the volume of closed field lines.

Cristel Chandre; Michel Vittot; Guido Ciraolo; Philippe Ghendrih; Ricardo Lima

2005-04-14T23:59:59.000Z

437

Lovell-Yellowtail transmission line rebuild project, Western Area Power  

NLE Websites -- All DOE Office Websites (Extended Search)

Lovell-Yellowtail Transmission Line Rebuild Project Lovell-Yellowtail Transmission Line Rebuild Project Project overview LVYT-1_158_092512 A contractor crew worked out of the bucket truck, Sept. 25, 2012, to perform dead-ending operations as part of phase 1 of the Lovell-to-Yellowtail transmission line rebuild. (Photo by Bob Kemp) See more photos of phase 1 and 2 constuction on Flickr. Western is rebuilding the Lovell-to-Yellowtail No. 1 and No. 2 115-kV transmission lines. The 94-circuit-miles of lines are located between Lovell, Wyo., and Yellowtail Dam, Mont. The rebuilt transmission lines are needed because the original lines were built by the Bureau of Reclamation in 1956 and 1966. The project will: Ensure reliability and safety of the transmission lines Improve capability to transmit full output from Yellowtail

438

Quantification of Line Tracking Solutions for Automotive Applications  

Science Journals Connector (OSTI)

Unlike the line tracking for automotive paint applications where the speed match between the robot and the vehicle body plays critical role for the paint quality, the line tracking for automotive general assembly...

Jane Shi; Rick F. Rourke; Dave Groll…

2009-01-01T23:59:59.000Z

439

Nondestructive Testing of Overhead Transmission Lines: Numerical and Experimental Investigation  

E-Print Network (OSTI)

Overhead transmission lines are periodically inspected using both on-ground and helicopter-aided visual inspection. Factors including sun glare, cloud cover, close proximity to power lines and the rapidly changing visual circumstances make airborne...

Kulkarni, Salil Subhash

2011-02-22T23:59:59.000Z

440

National High Magnetic Field Laboratory - Drawing Field Lines...  

NLE Websites -- All DOE Office Websites (Extended Search)

A Portrait of Magnetism: Drawing Field Lines Try This At Home Magnets have two poles; the field lines spread out from the north pole and circle back around to the south pole. In...

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Secretary Chu Thanks Utility Staff and Line Workers For Their...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

facts? Utility companies have deployed 64,000 linemen and utility staff to the front lines to repair downed power lines and bring electricity back online. As they finish up in...

442

The Pre-storm Environment of Midlatitude Prefrontal Squall Lines  

Science Journals Connector (OSTI)

Composite environmental profiles Of wind and temperature are presented for squall line cases that are spatially removed from frontal disturbances. The motions of the squall lines are inferred from radar data, and the mean environmental wind ...

Jonathan Wyss; Kerry A. Emanuel

1988-03-01T23:59:59.000Z

443

Increasing the Capacity of Existing Power Lines | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Increasing the Capacity of Existing Power Lines Increasing the Capacity of Existing Power Lines The capacity of the grid has been largely unchanged for decades and needs to expand...

444

Discrete Propagation in Numerically Simulated Nocturnal Squall Lines  

Science Journals Connector (OSTI)

Simulations of a typical midlatitude squall line were used to investigate a mechanism for discrete propagation, defined as convective initiation ahead of an existing squall line leading to a faster propagation speed for the storm complex. Radar ...

Robert G. Fovell; Gretchen L. Mullendore; Seung-Hee Kim

2006-12-01T23:59:59.000Z

445

A Theory for Strong, Long-Lived Squall Lines  

Science Journals Connector (OSTI)

We study herein the mechanics of long-lived, line-oriented, precipitating cumulus convection (squall lines) using two- and three-dimensional numerical models of moist convection. These models, used in juxtaposition, enable us to address the ...

Richard Rotunno; Joseph B. Klemp; Morris L. Weisman

1988-02-01T23:59:59.000Z

446

Updated Web Tool Focuses on Bottom Line for Distributed Wind...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Updated Web Tool Focuses on Bottom Line for Distributed Wind Turbines Updated Web Tool Focuses on Bottom Line for Distributed Wind Turbines January 10, 2013 - 2:43pm Addthis This...

447

Mode conversation losses in overmolded millimeter wave transmission lines  

E-Print Network (OSTI)

Millimeter wave transmission lines are integral components for many important applications like nuclear fusion and NMR spectroscopy. In low loss corrugated transmission lines propagating the HE,1 mode with a high waveguide ...

Tax, David S. (David Samuel)

2008-01-01T23:59:59.000Z

448

EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware EIS-0465: Mid-Atlantic Power Pathway Transmission Line Project in Maryland and Delaware March 4,...

449

EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Boardman-Hemingway Transmission Line, Oregon and Idaho EIS-0507: Boardman-Hemingway Transmission Line, Oregon and Idaho SUMMARY The Bureau of Land Management and the U.S. Forest...

450

Radio-Frequency Inverters With Transmission-Line Input Networks  

E-Print Network (OSTI)

A soft-switching inverter topology (the Class Phi ) is presented which draws dc source current through a transmission line or a lumped-network approximation of a distributed line. By aligning the inverter switching frequency ...

Phinney, Joshua W.

451

Construction of transmission lines above valuable standing timber  

Science Journals Connector (OSTI)

Problems with the construction of transmission lines above a forest are examined. Construction of lines above standing timber makes it possible to shorten the length of the route, eliminate the clearing of a cont...

L. O. Aizenberg; E. A. Khvoles

2007-11-01T23:59:59.000Z

452

On the Energy Efficiency of Mixed-Line-Rate Networks  

Science Journals Connector (OSTI)

We present an approach to evaluate energy efficiency of mixed-line-rate (MLR) optical networks. A comparative study of energy efficiency of MLR and single-line-rate (SLR) networks...

Chowdhury, Pulak; Tornatore, Massimo; Mukherjee, Biswanath

453

E-Print Network 3.0 - ac transmission lines Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

lines Search Powered by Explorit Topic List Advanced Search Sample search results for: ac transmission lines...

454

E-Print Network 3.0 - astrocytoma cell lines Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

lines Search Powered by Explorit Topic List Advanced Search Sample search results for: astrocytoma cell lines...

455

E-Print Network 3.0 - adenocarcinoma cell lines Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

lines Search Powered by Explorit Topic List Advanced Search Sample search results for: adenocarcinoma cell lines...

456

E-Print Network 3.0 - ac transmission line Sample Search Results  

NLE Websites -- All DOE Office Websites (Extended Search)

line Search Powered by Explorit Topic List Advanced Search Sample search results for: ac transmission line...

457

On a two-loop crossed six-line master integral with two massive lines  

E-Print Network (OSTI)

We compute the two-loop crossed six-line vertex master integral with two massive lines in dimensional regularisation, and give the result up to the finite part in D-4. We focus in particular on the purely analytical calculation of the boundary condition which we derive from a three-fold Mellin-Barnes representation. We also describe how the computation of the boundary condition is used to derive three non-trivial relations among harmonic polylogarithms of the sixth root of unity.

T. Huber

2009-01-14T23:59:59.000Z

458

North American Short Line and Regional Railroads Industry Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Short Line and American Short Line and Short Line and American Short Line and Regional Railroad Association Regional Railroad Association " " The Voice of America The Voice of America ' ' s Independent Railroads s Independent Railroads " " 4/27/2005 2 ASLRRA Membership ASLRRA Membership 0 100 200 300 400 500 600 700 800 Total Number of Member Companies 1943 1953 1963 1973 1983 1993 2003 Year ASLRRA Member History (1943 - 2003) Associate Railroad

459

Analysis ofNematic Liquid Crystals with Disclination Lines  

E-Print Network (OSTI)

with Disclination Lines. PATRICIA BAUMAN*, JINHAE PARKT & DANIEL PHILLIPs*. Abstract. We investigate the structure of nematic liquid crystal thin ?lms ...

460

Modelling boron-lined proportional counter response to neutrons  

Science Journals Connector (OSTI)

......of lithium. BF3 and boron-lined proportional...counters that employ 10B isotopes, the first in the gaseous...might be expected that boron-lined counters would...function of a typical boron-lined counter (2013...Koohi-Fayegh R. Determination of 4.43 MeV gamma-ray......

A. Shahri; N. Ghal-Eh; G. R. Etaati

2013-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements  

E-Print Network (OSTI)

Online Transmission Line Loadability Assessment Using Synchrophasor Measurements Jiangmeng Zhang}@illinois.edu Abstract--This paper proposes a measurement-based method to assess transmission line loadability a stable operation. Transmission line loading limits are also essential to deter- mine locational marginal

Liberzon, Daniel

462

New approach for modelling distributed MEMS transmission lines  

E-Print Network (OSTI)

New approach for modelling distributed MEMS transmission lines K. Topalli, M. Unlu, S. Demir, O for the distributed MEMS transmission line (DMTL) structures. In this new model, the MEMS bridges that are used as the loading elements of the DMTL structures are represented as low-impedance transmission lines, rather than

Akin, Tayfun

463

Experimental characterisations of thin film transmission line losses  

E-Print Network (OSTI)

Experimental characterisations of thin film transmission line losses D. Kim, H. Kim and Y. Eo New frequency-variant losses of planar thin film transmission lines are experimentally investigated in a broad frequency range. The fre- quency-variant transmission line parameters are accurately determined

464

Exponential asymptotics and Stokes lines in nonlinear ordinary differential equations  

Science Journals Connector (OSTI)

...well-known Stokes line-smoothing phenomenon in linear...nonlinear equations|exponential asymptotics| Exponential...known Stokes line-smoothing phenomenon in linear...nonlinear equations; exponential asymptotics 1...well-known Stokes line-smoothing phenomenon in linear...the subdominant exponentials in the outer expansion...

1998-01-01T23:59:59.000Z

465

Ridgeview Publishing Company Indeterminism and the Thin Red Line  

E-Print Network (OSTI)

Ridgeview Publishing Company Indeterminism and the Thin Red Line Author(s): Nuel Belnap INDETERMINISM AND THE THIN RED LINE NuelBelnapandMitchellGreen Universityof Pittsburgh 1. Introduction 2,settledness,andactualityin branchingtime 5. The AssertionProblem 6. TheThinRedLine 7. Time's wingedchariothurriesnear 1. Introduction

Belnap, Nuel

466

Fuzzy Relative Positioning for On-Line Handwritten Stroke Analysis  

E-Print Network (OSTI)

Fuzzy Relative Positioning for On-Line Handwritten Stroke Analysis Franc¸ois Bouteruche, S and robust mod- elling of the relative positioning of on-line handwritten strokes. We exploit the fuzzy to deal with the particular nature of on-line strokes, which are consti- tuted of non-connected points

Paris-Sud XI, Université de

467

Molecular Lines as Diagnostics of Solar and Stellar Magnetic Fields  

E-Print Network (OSTI)

Molecular Lines as Diagnostics of Solar and Stellar Magnetic Fields S.V. Berdyugina1, S.K. Solanki2 of different OH lines are reproduced without invoking any free parameters, except the magnetic field strength to significant improvements in the deduced magnetic field vector. Here we investigate how molecular lines can

Berdyugina, Svetlana

468

Towards feature-driven planning of product-line evolution  

Science Journals Connector (OSTI)

Industries that successfully apply product line approaches often operate in markets that are well established and have a strategic perspective. Consequently, such organizations have a tendency towards long-term planning of products and product lines. ... Keywords: evolution, feature modeling, product line engineering

Goetz Botterweck; Andreas Pleuss; Andreas Polzer; Stefan Kowalewski

2009-10-01T23:59:59.000Z

469

Blend lines in the polarized spectrum of the Sun  

Science Journals Connector (OSTI)

......July 2012 research-article Papers Blend lines in the polarized spectrum of the Sun K...Astrophysics, Bangalore 560034, India Blend lines form an integral part of the theoretical...Their interaction with other spectral lines needs to be explored and understood before......

K. Sowmya; K. N. Nagendra; M. Sampoorna

2012-07-01T23:59:59.000Z

470

Stark parameter measurement of Ar II UV spectral lines  

Science Journals Connector (OSTI)

......parameter measurement of Ar-ii UV spectral lines S. Djurovic 1 M. T. Belmonte 2 R. J...of Stark parameters of Ar-ii spectral lines. We report 126 half-width and 111 shift...16-000 to 26-000-K. atomic data|line: profiles|plasmas| 1 INTRODUCTION Stark......

S. Djurovic; M. T. Belmonte; R. J. Peláez; J. A. Aparicio; S. Mar

2013-01-01T23:59:59.000Z

471

Trees and Power Lines: Minimizing Conflicts between Electric Power  

E-Print Network (OSTI)

Trees and Power Lines: Minimizing Conflicts between Electric Power Infrastructure and the Urban Forest By William Brock Most 1 and Steven Weissman 2 March 10, 2012 #12;iiTrees and Power Lines Trees and Power Lines 5 5. Benefits of the Urban Forest 6 a. Carbon Sequestration 6 b. Property Value 6

Kammen, Daniel M.

472

Experimental Stark widths and shifts of Cr II spectral lines  

Science Journals Connector (OSTI)

......Stark widths and shifts of Crii spectral lines J. A. Aguilera 1 C. Aragon 1 J. Manrique...Spain Stark widths and shifts of Crii lines with wavelengths in the range 2000-3500-a...to control the self-absorption of the lines. The Stark widths and shifts are compared......

J. A. Aguilera; C. Aragón; J. Manrique

2014-01-01T23:59:59.000Z

473

Computing Criticality of Lines in Power Systems Computational Research Div.  

E-Print Network (OSTI)

Computing Criticality of Lines in Power Systems Ali Pinar Computational Research Div. Lawrence critical lines, failure of which can cause severe blackouts. Our method computes criticality measure for all lines at a time, as opposed to detecting a single vulnerability, providing a global view

Geddes, Cameron Guy Robinson

474

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits  

E-Print Network (OSTI)

Optimized Waveform Relaxation Solution of RLCG Transmission Line Type Circuits Mohammad D. Al to transmission line circuit problems based on the longitudinal partitioning into segments. This greatly improves the convergence for strongly coupled RLCG transmission line (TL) type circuits. The method can be applied to other

Gander, Martin J.

475

Using Transmission Lines for Global On-Chip Communication  

E-Print Network (OSTI)

1 Using Transmission Lines for Global On-Chip Communication Aaron Carpenter, Jianyun Hu, Jie Xu-switched network-on-chip a less attractive option. An alternative solution uses well-engineered transmission lines as communication links. These transmission lines, along with simple, practical circuits using modern CMOS technol

Huang, Michael C.

476

Transmission Line Boundary Protection Using Wavelet Transform and Neural Network  

E-Print Network (OSTI)

1 Transmission Line Boundary Protection Using Wavelet Transform and Neural Network Nan Zhang of transmission line protection are: a) differentiating precisely the internal faults from external, and b is verified using frequency-dependent transmission line model and the test results prove its enhanced

477

EXTENSION OF THE TRANSMISSION LINE THEORY APPLICATION WITH MODIFIED  

E-Print Network (OSTI)

1 EXTENSION OF THE TRANSMISSION LINE THEORY APPLICATION WITH MODIFIED ENHANCED PER introduces a modified enhanced transmission-line theory to account for higher-order modes while using a standard transmission line equation solver or equivalently a Baum, Liu and Tesche (BLT) equation solver

Paris-Sud XI, Université de

478

Asymmetric parametric amplification in nonlinear left-handed transmission lines  

E-Print Network (OSTI)

Asymmetric parametric amplification in nonlinear left-handed transmission lines David A. Powell amplification in nonlinear left-handed transmission lines, which serve as model systems for nonlinear negative-handed regime. © 2009 American Institute of Physics. DOI: 10.1063/1.3089842 Left-handed transmission lines

479

Rubber linings as surface protection in flue gas desulfurization plants  

SciTech Connect

The manufacturers of the German rubber lining industry have executed the rubber lining of over 1 million m{sup 2} of steel surfaces in over 150 scrubbers of flue gas desulfurization (FGD) plants, thereby effectively protecting them against corrosion. The application of rubber linings as surface protection in FGD plants has proven effective.

Fenner, J.

1997-04-01T23:59:59.000Z

480

Transmission Line Structure Spotting and Optimization within a Defined Transmission Line Routing Centerline Using Non-Linear Programming Models  

E-Print Network (OSTI)

and optimize structure heights for overhead transmission lines. The modeling tool will address common problems in determining overhead transmission line structure heights and locations. Some of the common problems consist of structure locations often having...

Cockrum, Joshua W.

2010-05-14T23:59:59.000Z

Note: This page contains sample records for the topic "line corridor cxs" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Bloated stars as AGN broad-line clouds: the emission-line profiles  

Science Journals Connector (OSTI)

......rela- tive line shifts. Nevertheless, even the remaining profile properties set strong constraints on the BS model. We pro- ceed on the premise that the asymmetries and relative shifts can eventually be explained either within the framework of the BS model......

Tal Alexander; Hagai Netzer

1997-02-01T23:59:59.000Z

482

Calibrating transport lines using LOCO techniques  

SciTech Connect

With the 12GeV upgrade underway at CEBAF, there is a need to re-characterize the beamlines after the modifications made to it to accommodate running at higher energies. We present a linear perturbation approach to calibrating the optics model of transport lines. This method is adapted from the LOCO method in use for storage rings. We consider the effect of quadrupole errors, dipole construction errors as well as beam position monitors and correctors calibrations. The ideal model is expanded to first order in Taylor series of the quadrupole errors. A set of difference orbits obtained by exciting the correctors along the beamline is taken, yielding the measured response matrix. An iterative procedure is invoked and the quadrupole errors as well as beam position monitors and corrector calibration factors are obtained. Here we present details of the method and results of first measurements at CEBAF in early 2011.

Yves Roblin

2011-09-01T23:59:59.000Z

483

Nonlinear transmission line based electron beam driver  

SciTech Connect

Gated field emission cathodes can provide short electron pulses without the requirement of laser systems or cathode heating required by photoemission or thermionic cathodes. The large electric field requirement for field emission to take place can be achieved by using a high aspect ratio cathode with a large field enhancement factor which reduces the voltage requirement for emission. In this paper, a cathode gate driver based on the output pulse train from a nonlinear transmission line is experimentally demonstrated. The application of the pulse train to a tufted carbon fiber field emission cathode generates short electron pulses. The pulses are approximately 2 ns in duration with emission currents of several mA, and the train contains up to 6 pulses at a frequency of 100 MHz. Particle-in-cell simulation is used to predict the characteristic of the current pulse train generated from a single carbon fiber field emission cathode using the same technique.

French, David M.; Hoff, Brad W.; Tang Wilkin; Heidger, Susan; Shiffler, Don [Directed Energy Directorate, Air Force Research Laboratory, Kirtland AFB, New Mexico 87117 (United States); Allen-Flowers, Jordan [Program in Applied Mathematics, University of Arizona, Tucson, Arizona 85721 (United States)

2012-12-15T23:59:59.000Z

484

Power Line Calculator for Windows[trademark  

SciTech Connect

The Power Line Calculator (PLC) for Windows [trademark], version 1.0, is a program that describes the electrical characteristics of a transmission or distribution system given user-defined input. This input may consist of a combination of operating currents and phases, symmetric components, power factor, and real or reactive power. The program also allows the user to designate whether currents are present on the system neutral or in the ground. The PLC assumes that any value entered by the user remains fixed (e.g., phase current, power factor), and for underdetermined systems, basic default assumptions are incorporated: the power factor is held at or near 1.0, the net phase current is kept at or near zero, and the phase conductor currents are kept balanced. The program operates through a graphical user interface provided by Microsoft[reg sign] Windows [trademark] (version 3.1 or higher required), and the output is available in both tabular and graphic formats.

Silva, J.M. (Enertech Consultants, Campbell, CA (United States))

1992-12-01T23:59:59.000Z

485

Atomic line emission analyzer for hydrogen isotopes  

DOE Patents (OSTI)

Apparatus for isotopic analysis of hydrogen comprises a low pressure chamber into which a sample of hydrogen is introduced and then exposed to an electrical discharge to excite the electrons of the hydrogen atoms to higher energy states and thereby cause the emission of light on the return to lower energy states, a Fresnel prism made at least in part of a material anomalously dispersive to the wavelengths of interest for dispersing the emitted light, and a photodiode array for receiving the dispersed light. The light emitted by the sample is filtered to pass only the desired wavelengths, such as one of the lines of the Balmer series for hydrogen, the wavelengths of which differ slightly from one isotope to another. The output of the photodiode array is processed to determine the relative amounts of each isotope present in the sample. Additionally, the sample itself may be recovered using a metal hydride.

Kronberg, James W. (108 Independent Blvd., Aiken, SC 29801)

1993-01-01T23:59:59.000Z

486

Spectral line broadening in magnetized black holes  

E-Print Network (OSTI)

We consider weakly magnetized non-rotating black holes. In the presence of a regular magnetic field the motion of charged particles in the vicinity of a black hole is modified. As a result, the position of the innermost stable circular orbit (ISCO) becomes closer to the horizon. When the Lorentz force is repulsive (directed from the black hole) the ISCO radius can reach the gravitational radius. In the process of accretion charged particles (ions) of the accreting matter can be accumulated near their ISCO, while neutral particles fall down to the black hole after they reach $6M$ radius. The sharp spectral line Fe K$\\alpha$, emitted by iron ions at such orbits, is broadened when the emission is registered by a distant observer. In this paper we study this broadening effect and discuss how one can extract information concerning the strength of the magnetic field from the observed spectrum.

Valeri P. Frolov; Andrey A. Shoom; Christos Tzounis

2014-05-02T23:59:59.000Z

487

Second Line of Defense Spares Program Assessment  

SciTech Connect

The Office of the Second Line of Defense (SLD) is part of the Department of Energy‘s (DOE) National Nuclear Security Administration (NNSA). The SLD Program accomplishes its critical global security mission by forming cooperative relationships with partner countries to install passive radiation detection systems that augment traditional inspection and law enforcement measures by alerting border officials to the presence of special nuclear or other radiological materials in cross-border traffic. An important tenet of the program is to work collaboratively with these countries to establish the necessary processes, procedures, infrastructure and conditions that will enable them to fully assume the financial and technical responsibilities for operating the equipment. As the number of operational deployments grows, the SLD Program faces an increasingly complex logistics process to promote the timely and efficient supply of spare parts.

Henderson, Dale L.; Muller, George; Mercier, Theresa M.; Brigantic, Robert T.; Perkins, Casey J.; Cooley, Scott K.

2012-11-20T23:59:59.000Z

488

Atomic line emission analyzer for hydrogen isotopes  

DOE Patents (OSTI)

Apparatus for isotopic analysis of hydrogen comprises a low pressure chamber into which a sample of hydrogen is introduced and then exposed to an electrical discharge to excite the electrons of the hydrogen atoms to higher energy states and thereby cause the emission of light on the return to lower energy states, a Fresnel prism made at least in part of a material anomalously dispersive to the wavelengths of interest for dispersing the emitted light, and a photodiode array for receiving the dispersed light. The light emitted by the sample is filtered to pass only the desired wavelengths, such as one of the lines of the Balmer series for hydrogen, the wavelengths of which differ slightly from one isotope to another. The output of the photodiode array is processed to determine the relative amounts of each isotope present in the sample. Additionally, the sample itself may be recovered using, a metal hydride.

Kronberg, J.W.

1991-05-08T23:59:59.000Z

489

Slip Line Field Applied To Deep Drawing  

Science Journals Connector (OSTI)

Slip Line Field is a numerical method applied for modelling plane?strain processes. This method has been successfully checked properly for sheet drawing. Flange deformation in deep drawing is considered without change in thickness. A drawing mechanical test has been developed in order to reproduce the flange stresses state in sheet strips with the rolling direction selected. The fundamentals of this test and some experimental results obtained from it have been presented previously in different Congresses. In this work an algorithm based on SLF has been implemented and theoretical results evaluated for different conditions. The algorithm have been applied to a mild DDQ steel and to a DDQ AISI 304 stainless steel. Theoretical and experimental results are compared. A good concordance in them has been found out under some conditions. One of the most important aspects is that it must not be considered tensile material properties but a modified behavior under multiaxial conditions.

V. Miguel; J. Benet; J. Coello; A. Calatayud; A. Martínez

2007-01-01T23:59:59.000Z

490

Dispersion-free radial transmission lines  

DOE Patents (OSTI)

A dispersion-free radial transmission line ("DFRTL") preferably for linear accelerators, having two plane conductors each with a central hole, and an electromagnetically permeable material ("EPM") between the two conductors and surrounding a channel connecting the two holes. At least one of the material parameters of relative magnetic permeability, relative dielectric permittivity, and axial width of the EPM is varied as a function of radius, so that the characteristic impedance of the DFRTL is held substantially constant, and pulse transmission therethrough is substantially dispersion-free. Preferably, the EPM is divided into concentric radial sections, with the varied material parameters held constant in each respective section but stepwise varied between sections as a step function of the radius. The radial widths of the concentric sections are selected so that pulse traversal time across each section is the same, and the varied material parameters of the concentric sections are selected to minimize traversal error.

Caporaso, George J. (Livermore, CA); Nelson, Scott D. (Patterson, CA)

2011-04-12T23:59:59.000Z

491

Modelling receding contact lines on superhydrophobic surfaces  

E-Print Network (OSTI)

We use mesoscale simulations to study the depinning of a receding contact line on a superhydrophobic surface patterned by a regular array of posts. In order that the simulations are feasible, we introduce a novel geometry where a column of liquid dewets a capillary bounded by a superhydrophobic plane which faces a smooth hydrophilic wall of variable contact angle. We present results for the dependence of the depinning angle on the shape and spacing of the posts, and discuss the form of the meniscus at depinning. We find, in agreement with [17], that the local post concentration is a primary factor in controlling the depinning angle, and show that the numerical results agree well with recent experiments. We also present two examples of metastable pinned configurations where the posts are partially wet.

B. M. Mognetti; J. M. Yeomans

2010-09-23T23:59:59.000Z

492

Atomic line emission analyzer for hydrogen isotopes  

DOE Patents (OSTI)

Apparatus for isotopic analysis of hydrogen comprises a low pressure chamber into which a sample of hydrogen is introduced and then exposed to an electrical discharge to excite the electrons of the hydrogen atoms to higher energy states and thereby cause the emission of light on the return to lower energy states, a Fresnel prism made at least in part of a material anomalously dispersive to the wavelengths of interest for dispersing the emitted light, and a photodiode array for receiving the dispersed light. The light emitted by the sample is filtered to pass only the desired wavelengths, such as one of the lines of the Balmer series for hydrogen, the wavelengths of which differ slightly from one isotope to another. The output of the photodiode array is processed to determine the relative amounts of each isotope present in the sample. Additionally, the sample itself may be recovered using a metal hydride.

Kronberg, J.W.

1993-03-30T23:59:59.000Z

493

EA-1896: Williston to Stateline Transmission Line Project, Mountrail  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

96: Williston to Stateline Transmission Line Project, 96: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota EA-1896: Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williston, North Dakota Summary DOE's Western Area Power Administration is preparing this EA to evaluate the environmental impacts of interconnecting the proposed Stateline I transmission line, in Williston, North Dakota, to Western's transmission system. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download May 4, 2012 EA-1896: Finding of No Significant Impact Williston to Stateline Transmission Line Project, Mountrail Williams Electric Cooperative, Williams County, North Dakota

494

Analysis of magnetic fields produced far from electric power lines  

SciTech Connect

In this paper, the authors develop a simple and general method for analyzing the magnetic fields produced by power lines at far distances, that is, at distances large in comparison to the spacing between the line's phase conductors. Magnetic fields produced far from conventional power lines have remarkably simple properties. The authors present formulae for the fields produced by various conventional and unconventional power line configurations; included are line designs characterized by reduced magnetic-field levels. Errors in the formulae are less than [plus minus]10% at the edge of a typical transmission right-of-way.

Kaune, W.T. (Enertech Consultants Campbell, CA (United States)); Zaffanella, L.E. (High Voltage Transmission Research Center, Lenox, MA (United States))

1992-10-01T23:59:59.000Z

495

Re-lining of scrubbers in flue gas desulfurization plants  

SciTech Connect

Rubber lining is used as corrosion protection material in scrubbers, tanks, pipe systems etc of European flue gas desulfurization plants. Although these rubber linings show in cases more than 15 years life, re-rubber lining is still necessary. Due to the expected higher availability of the power station units the time scale of such replacement must be kept to a minimum. As an efficient method for removal of the old lining the high pressure water systems has proven successful. Based on one such case of re-lining the working steps and time scale are demonstrated.

Fenner, J. [Keramchemie GmbH, Siershahn (Germany)

1999-11-01T23:59:59.000Z

496

Definition: Automated Feeder And Line Switching | Open Energy Information  

Open Energy Info (EERE)

Definition Definition Edit with form History Facebook icon Twitter icon » Definition: Automated Feeder And Line Switching Jump to: navigation, search Dictionary.png Automated Feeder And Line Switching Automated feeder and line switching is realized through automatic isolation and reconfiguration of faulted segments of distribution feeders or transmission lines via sensors, controls, switches, and communications systems. These devices can operate autonomously in response to local events or in response to signals from a central control system.[1] Related Terms transmission lines, transmission line References ↑ SmartGrid.gov 'Description of Functions' An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Automated_Feeder_And_Line_Switching&oldid=480562"

497

Advance Funding and Development Agreement: Plains & Eastern Clean Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advance Funding and Development Agreement: Plains & Eastern Clean Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) Advance Funding and Development Agreement: Plains & Eastern Clean Line Transmission Project (September 20, 2012) More Documents & Publications Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Letter from Deputy Secretary Poneman to Clean Line Energy Regarding the Plains & Eastern Clean Line Project Under Section 1222 of EPAct 2005 (April 5, 2012) EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland

498

Green Power Transmission Line Given New Life | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life Green Power Transmission Line Given New Life March 11, 2010 - 4:34pm Addthis Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Poles for the Montana-Alberta Tie Line are unloaded outside Shelby, Mont. | Photo courtesy of Tonbridge Power Stephen Graff Former Writer & editor for Energy Empowers, EERE Thanks to funds from the American Recovery and Reinvestment Act, construction of a green power transmission line stretching from Lethbridge, Alberta in Canada, down to Great Falls, Mont., was put back on track after a bank failure. Currently under construction, the Montana-Alberta Tie Line, which is owned by Toronto-based Tonbridge Power, will connect the electricity markets of

499

Proposed Project: Plains & Eastern Clean Line | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Section 1222 of the Energy Policy Act 2005 » Proposed Project: Plains & Eastern Clean Line Proposed Project: Plains & Eastern Clean Line On June 10, 2010, the Department of Energy published in the Federal Register a Request for Proposals (RFP) for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act (EPAct) of 2005. In response, Clean Line Energy Partners, LLC submitted an application for its Plains & Eastern Clean Line project. DOE has concluded that Clean Line's proposal was responsive to the RFP, and it is currently under consideration. The proposed Plains & Eastern Clean Line project (the proposed project) would include an overhead +/- 600 kV direct current electric transmission system and associated facilities with the capacity to deliver approximately

500

Method for bonding a transmission line to a downhole tool  

DOE Patents (OSTI)

An apparatus for bonding a transmission line to the central bore of a downhole tool includes a pre-formed interface for bonding a transmission line to the inside diameter of a downhole tool. The pre-formed interface includes a first surface that substantially conforms to the outside contour of a transmission line and a second surface that substantially conforms to the inside diameter of a downhole tool. In another aspect of the invention, a method for bonding a transmission line to the inside diameter of a downhole tool includes positioning a transmission line near the inside wall of a downhole tool and placing a mold near the transmission line and the inside wall. The method further includes injecting a bonding material into the mold and curing the bonding material such that the bonding material bonds the transmission line to the inside wall.

Hall, David R. (Provo, UT); Fox, Joe (Spanish Fork, UT)

2007-11-06T23:59:59.000Z