  1. Innovative Feed-In Tariff Designs that Limit Policy Costs

    SciTech Connect (OSTI)

    Kreycik, C.; Couture, T. D.; Cory, K. S.

    2011-06-01

    Feed-in tariffs (FITs) are the most prevalent renewable energy policy used globally to date, and there are many benefits to the certainty offered in the marketplace to reduce development risks and associated financing costs and to grow the renewable energy industry. However, concerns over escalating costs in jurisdictions with FIT policies have led to increased attention on cost control in renewable energy policy design. In recent years, policy mechanisms for containing FIT costs have become more refined, allowing policymakers to exert greater control on policy outcomes and on the resulting costs to ratepayers. As policymakers and regulators in the United States begin to explore the use of FITs, careful consideration must be given to the ways in which policy design can be used to balance the policies' advantages while bounding its costs. This report explores mechanisms that policymakers have implemented to limit FIT policy costs. If designed clearly and transparently, such mechanisms can align policymaker and market expectations for project deployment. Three different policy tools are evaluated: (1) caps, (2) payment level adjustment mechanisms, and (3) auction-based designs. The report employs case studies to explore the strengths and weaknesses of these three cost containment tools. These tools are then evaluated with a set of criteria including predictability for policymakers and the marketplace and the potential for unintended consequences.

  2. Innovative Feed-In Tariff Designs that Limit Policy Costs (Technical...

    Office of Scientific and Technical Information (OSTI)

    However, concerns over escalating costs in jurisdictions with FIT policies have led to increased attention on cost control. Using case studies and market-focused analysis, this ...

  3. Innovative Feed-In Tariff Designs that Limit Policy Costs (Technical...

    Office of Scientific and Technical Information (OSTI)

    Feed-in tariffs (FITs) are the most prevalent policy used globally to reduce development risks, cut financing costs, and grow the renewable energy industry. However, concerns over ...

  4. Post Award Auditing of Cost Reimbursable Subcontracts Policy | The Ames

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Post Award Auditing of Cost Reimbursable Subcontracts Policy Version Number: 0 Document Number: Policy 10300.003 Effective Date: 07

  5. Cost and Impacts of Policies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Impacts of Policies Cost and Impacts of Policies Presentation by David Greene and Paul Leiby at the 2010-2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles and Infrastructure meeting, January 31, 2007. PDF icon scenario_analysis_greene1_07.pdf More Documents & Publications Hydrogen Policy and Analyzing the Transition Integrated Market Modeling of Hydrogen Transition Scenarios with HyTrans Hydrogen Transition Study

  6. Policy Flash 2013-79 Professional and Consultant service cost (FAR

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31.205-33) | Department of Energy 9 Professional and Consultant service cost (FAR 31.205-33) Policy Flash 2013-79 Professional and Consultant service cost (FAR 31.205-33) Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at Jason.taylor@hq.doe.gov. PDF icon Flash_reminder (2).pdf More Documents & Publications Policy Flash

  7. Final Technical Report Power through Policy: "Best Practices" for Cost-Effective Distributed Wind

    SciTech Connect (OSTI)

    Rhoads-Weaver, Heather; Gagne, Matthew; Sahl, Kurt; Orrell, Alice; Banks, Jennifer

    2012-02-28

    Power through Policy: 'Best Practices' for Cost-Effective Distributed Wind is a U.S. Department of Energy (DOE)-funded project to identify distributed wind technology policy best practices and to help policymakers, utilities, advocates, and consumers examine their effectiveness using a pro forma model. Incorporating a customized feed from the Database of State Incentives for Renewables and Efficiency (DSIRE), the Web-based Distributed Wind Policy Comparison Tool (Policy Tool) is designed to assist state, local, and utility officials in understanding the financial impacts of different policy options to help reduce the cost of distributed wind technologies. The project's final products include the Distributed Wind Policy Comparison Tool, found at www.windpolicytool.org, and its accompanying documentation: Distributed Wind Policy Comparison Tool Guidebook: User Instructions, Assumptions, and Case Studies. With only two initial user inputs required, the Policy Tool allows users to adjust and test a wide range of policy-related variables through a user-friendly dashboard interface with slider bars. The Policy Tool is populated with a variety of financial variables, including turbine costs, electricity rates, policies, and financial incentives; economic variables including discount and escalation rates; as well as technical variables that impact electricity production, such as turbine power curves and wind speed. The Policy Tool allows users to change many of the variables, including the policies, to gauge the expected impacts that various policy combinations could have on the cost of energy (COE), net present value (NPV), internal rate of return (IRR), and the simple payback of distributed wind projects ranging in size from 2.4 kilowatts (kW) to 100 kW. The project conducted case studies to demonstrate how the Policy Tool can provide insights into 'what if' scenarios and also allow the current status of incentives to be examined or defended when necessary. The ranking of distributed wind state policy and economic environments summarized in the attached report, based on the Policy Tool's default COE results, highlights favorable market opportunities for distributed wind growth as well as market conditions ripe for improvement. Best practices for distributed wind state policies are identified through an evaluation of their effect on improving the bottom line of project investments. The case studies and state rankings were based on incentives, power curves, and turbine pricing as of 2010, and may not match the current results from the Policy Tool. The Policy Tool can be used to evaluate the ways that a variety of federal and state policies and incentives impact the economics of distributed wind (and subsequently its expected market growth). It also allows policymakers to determine the impact of policy options, addressing market challenges identified in the U.S. DOE's '20% Wind Energy by 2030' report and helping to meet COE targets. In providing a simple and easy-to-use policy comparison tool that estimates financial performance, the Policy Tool and guidebook are expected to enhance market expansion by the small wind industry by increasing and refining the understanding of distributed wind costs, policy best practices, and key market opportunities in all 50 states. This comprehensive overview and customized software to quickly calculate and compare policy scenarios represent a fundamental step in allowing policymakers to see how their decisions impact the bottom line for distributed wind consumers, while estimating the relative advantages of different options available in their policy toolboxes. Interested stakeholders have suggested numerous ways to enhance and expand the initial effort to develop an even more user-friendly Policy Tool and guidebook, including the enhancement and expansion of the current tool, and conducting further analysis. The report and the project's Guidebook include further details on possible next steps. NREL Report No. BK-5500-53127; DOE/GO-102011-3453.

  8. Policy Flash 2014-26 Acquisition Guide Chapter 70.31A - Costs Associated

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    with Whistleblower Actions | Department of Energy 6 Acquisition Guide Chapter 70.31A - Costs Associated with Whistleblower Actions Policy Flash 2014-26 Acquisition Guide Chapter 70.31A - Costs Associated with Whistleblower Actions Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division at (202) 287-1560 or at Jason.Taylor@hq.doe.gov PDF icon Flash_AG_70 31A.pdf PDF icon AcqGuide70pt31A Rev1.pdf More Documents &

  9. Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies Policies The Research Library provides a large collection of print and electronic books, journals, reports, conference proceedings and many audio/visual materials. Research Library items are available for check out to LANL employees and retirees only. Item Count There is a 50 item limit per customer. Loan Periods Books 28 days 10 days if on hold for another patron Reports 28 days for print copies 7 days for microfiche What if I lose materials that are on my record? Library materials

  10. Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    are in .pdf format) After Hours Access Policy Booking and Login Policy Cleanroom Policy Equipment Use Policy Two-Person Rule Cleanroom Chemical List Experimental Hall Policy...

  11. Weighing the Costs and Benefits of Renewables Portfolio Standards:A Comparative Analysis of State-Level Policy Impact Projections

    SciTech Connect (OSTI)

    Chen, Cliff; Wiser, Ryan; Bolinger, Mark

    2007-01-16

    State renewables portfolio standards (RPS) have emerged as one of the most important policy drivers of renewable energy capacity expansion in the U.S. Collectively, these policies now apply to roughly 40% of U.S. electricity load, and may have substantial impacts on electricity markets, ratepayers, and local economies. As RPS policies have been proposed or adopted in an increasing number of states, a growing number of studies have attempted to quantify the potential impacts of these policies, focusing primarily on projecting cost impacts, but sometimes also estimating macroeconomic and environmental effects. This report synthesizes and analyzes the results and methodologies of 28 distinct state or utility-level RPS cost impact analyses completed since 1998. Together, these studies model proposed or adopted RPS policies in 18 different states. We highlight the key findings of these studies on the costs and benefits of RPS policies, examine the sensitivity of projected costs to model assumptions, assess the attributes of different modeling approaches, and suggest possible areas of improvement for future RPS analysis.

  12. A Review of Recent RTO Benefit-Cost Studies: Toward MoreComprehensive Assessments of FERC Electricity RestructuringPolicies

    SciTech Connect (OSTI)

    Eto, Joseph H.; Lesieutre, Bernard C.

    2005-12-01

    During the past three years, government and private organizations have issued more than a dozen studies of the benefits and costs of Regional Transmission Organizations (RTOs). Most of these studies have focused on benefits that can be readily estimated using traditional production-cost simulation techniques, which compare the cost of centralized dispatch under an RTO to dispatch in the absence of an RTO, and on costs associated with RTO start-up and operation. Taken as a whole, it is difficult to draw definitive conclusions from these studies because they have not examined potentially much larger benefits (and costs) resulting from the impacts of RTOs on reliability management, generation and transmission investment and operation, and wholesale electricity market operation. This report: (1) Describes the history of benefit-cost analysis of FERC electricity restructuring policies; (2)Reviews current practice by analyzing 11 RTO benefit-cost studies that were published between 2002 and 2004 and makes recommendations to improve the documentation of data and methods and the presentation of findings in future studies that focus primarily on estimating short-run economic impacts; and (3) Reviews important impacts of FERC policies that have been overlooked or incompletely treated by recent RTO benefit-cost studies and the challenges to crafting more comprehensive assessments of these impacts based on actual performance, including impacts on reliability management, generation and transmission investment and operation, and wholesale electricity market operation.

  13. Policy Flash 2014-26 Acquisition Guide Chapter 70.31A - Costs...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division at (202) 287-1560 or at Jason.Taylor@hq.doe.gov PDF ...

  14. Innovative Feed-In Tariff Designs that Limit Policy Costs | Open...

    Open Energy Info (EERE)

    investment tax credit, the production tax credit, and accelerated depreciation. The nature of these tax incentives often requires an outside investor and a complex financial...

  15. Limiter

    DOE Patents [OSTI]

    Cohen, S.A.; Hosea, J.C.; Timberlake, J.R.

    1984-10-19

    A limiter with a specially contoured front face is provided. The front face of the limiter (the plasma-side face) is flat with a central indentation. In addition, the limiter shape is cylindrically symmetric so that the limiter can be rotated for greater heat distribution. This limiter shape accommodates the various power scrape-off distances lambda p, which depend on the parallel velocity, V/sub parallel/, of the impacting particles.

  16. Limiter

    DOE Patents [OSTI]

    Cohen, Samuel A. (Hopewell, NJ); Hosea, Joel C. (Princeton, NJ); Timberlake, John R. (Allentown, NJ)

    1986-01-01

    A limiter with a specially contoured front face accommodates the various power scrape-off distances .lambda..sub.p, which depend on the parallel velocity, V.sub..parallel., of the impacting particles. The front face of the limiter (the plasma-side face) is flat with a central indentation. In addition, the limiter shape is cylindrically symmetric so that the limiter can be rotated for greater heat distribution.

  17. A retrospective investigation of energy efficiency standards: Policies may have accelerated long term declines in appliance costs

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Van Buskirk, R. D.; Kantner, C. L. S.; Gerke, B. F.; Chu, S.

    2014-11-14

    We perform a retrospective investigation of multi-decade trends in price and life-cycle cost (LCC) for home appliances in periods with and without energy efficiency (EE) standards and labeling polices. In contrast to the classical picture of the impact of efficiency standards, the introduction and updating of appliance standards is not associated with a long-term increase in purchase price; rather, quality-adjusted prices undergo a continued or accelerated long-term decline. In addition, long term trends in appliance LCCs—which include operating costs—consistently show an accelerated long term decline with EE policies. We also show that the incremental price of efficiency improvements has declinedmore »faster than the baseline product price for selected products. These observations are inconsistent with a view of EE standards that supposes a perfectly competitive market with static supply costs. These results suggest that EE policies may be associated with other forces at play, such as innovation and learning-by-doing in appliance production and design, that can affect long term trends in quality-adjusted prices and LCCs.« less

  18. A retrospective investigation of energy efficiency standards: Policies may have accelerated long term declines in appliance costs

    SciTech Connect (OSTI)

    Van Buskirk, R. D.; Kantner, C. L. S.; Gerke, B. F.; Chu, S.

    2014-11-14

    We perform a retrospective investigation of multi-decade trends in price and life-cycle cost (LCC) for home appliances in periods with and without energy efficiency (EE) standards and labeling polices. In contrast to the classical picture of the impact of efficiency standards, the introduction and updating of appliance standards is not associated with a long-term increase in purchase price; rather, quality-adjusted prices undergo a continued or accelerated long-term decline. In addition, long term trends in appliance LCCs—which include operating costs—consistently show an accelerated long term decline with EE policies. We also show that the incremental price of efficiency improvements has declined faster than the baseline product price for selected products. These observations are inconsistent with a view of EE standards that supposes a perfectly competitive market with static supply costs. These results suggest that EE policies may be associated with other forces at play, such as innovation and learning-by-doing in appliance production and design, that can affect long term trends in quality-adjusted prices and LCCs.

  19. policy

    National Nuclear Security Administration (NNSA)

    eld-field-page-name">

    Page Name: 
    policysystem

    The NNSA's Policy...

  20. Further Sensitivity Analysis of Hypothetical Policies to Limit Energy-Related Carbon Dioxide Emissions

    Reports and Publications (EIA)

    2013-01-01

    This analysis supplements the Annual Energy Outlook 2013 alternative cases which imposed hypothetical carbon dioxide emission fees on fossil fuel consumers. It offers further cases that examine the impacts of fees placed only on the emissions from electric power facilities, impacts of returning potential revenues to consumers, and two cap-and-trade policies.

  1. Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement Costs

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at ...

  2. POLICY

    Energy Savers [EERE]

    3 POLICY * Successful execution of this research and development (R&D) program will materially contribute to U.S. supply of oil and gas both today and beyond the 10 year R&D horizon. It is the consensus of this Committee that the resource potential impacted by this technology program is significant and of major importance to the Nation. There is a critical need for a sustainable and consistent approach to the technology challenges facing unconventional resource development. * The

  3. POLICY

    Energy Savers [EERE]

    November 13, 2013 POLICY  Successful execution of this research and development (R&D) program will materially contribute to U.S. supply of oil and gas both today and beyond the 10 year R&D horizon. It is the consensus of this Committee that the resource potential impacted by this technology program is significant and of major importance to the Nation. There is a critical need for a sustainable and consistent approach to the technology challenges facing unconventional resource

  4. Policy Flash 2013-40 Acquisition Guide Chapter 43.3 – Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimburstment Contracts

    Broader source: Energy.gov [DOE]

    Attached is Policy Flash 2013-40 Acquisition Guide Chapter 43.3 – Maintaining Alignment of Project   Management with Contract Management of Non-Management and Operating (M&O) Cost Reimbursement...

  5. Microfabrication Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Polcies Booking Login Policy Cleanroom Policy Equipment Use Policy 2 Person Rule Experimental Hall Policy After Hours Policy

  6. U.S. OpenLabs - Policy and Program Analysis | Open Energy Information

    Open Energy Info (EERE)

    The NRELDOE Approach Feed-in Tariffs: Best Practices and Application in the U.S. Hydrogen Analysis (H2A) Innovative Feed-In Tariff Designs that Limit Policy Costs NREL...

  7. Privacy Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    privacy policy Privacy Policy The National Energy Technology Laboratory strives to protect the privacy of website visitors. Information collected is strictly limited to the following: Information Collected and Stored Automatically The IP address, a number that is automatically assigned to each computer that connects to the World Wide Web Date and time of website access Pages browsed NETL reviews this information to help make the website more useful and informative. This information is used

  8. Water Use in Enhanced Geothermal Systems (EGS): Geology of U.S. Stimulation Projects, Water Costs, and Alternative Water Use Policies

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Schroeder, Jenna N.

    2014-12-16

    According to the Energy Information Administration (EIA) of the U.S. Department of Energy (DOE), geothermal energy generation in the United States is projected to more than triple by 2040 (EIA 2013). This addition, which translates to more than 5 GW of generation capacity, is anticipated because of technological advances and an increase in available sources through the continued development of enhanced geothermal systems (EGSs) and low-temperature resources (EIA 2013). Studies have shown that air emissions, water consumption, and land use for geothermal electricity generation have less of an impact than traditional fossil fuel?based electricity generation; however, the long-term sustainability of geothermal power plants can be affected by insufficient replacement of aboveground or belowground operational fluid losses resulting from normal operations (Schroeder et al. 2014). Thus, access to water is therefore critical for increased deployment of EGS technologies and, therefore, growth of the geothermal sector. This paper examines water issues relating to EGS development from a variety of perspectives. It starts by exploring the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects. It then examines the relative costs of different potential traditional and alternative water sources for EGS. Finally it summarizes specific state policies relevant to the use of alternative water sources for EGS, and finally explores the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects.

  9. Water Use in Enhanced Geothermal Systems (EGS): Geology of U.S. Stimulation Projects, Water Costs, and Alternative Water Use Policies

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Schroeder, Jenna N.

    According to the Energy Information Administration (EIA) of the U.S. Department of Energy (DOE), geothermal energy generation in the United States is projected to more than triple by 2040 (EIA 2013). This addition, which translates to more than 5 GW of generation capacity, is anticipated because of technological advances and an increase in available sources through the continued development of enhanced geothermal systems (EGSs) and low-temperature resources (EIA 2013). Studies have shown that air emissions, water consumption, and land use for geothermal electricity generation have less of an impact than traditional fossil fuel?based electricity generation; however, the long-term sustainability of geothermal power plants can be affected by insufficient replacement of aboveground or belowground operational fluid losses resulting from normal operations (Schroeder et al. 2014). Thus, access to water is therefore critical for increased deployment of EGS technologies and, therefore, growth of the geothermal sector. This paper examines water issues relating to EGS development from a variety of perspectives. It starts by exploring the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects. It then examines the relative costs of different potential traditional and alternative water sources for EGS. Finally it summarizes specific state policies relevant to the use of alternative water sources for EGS, and finally explores the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects.

  10. Attached is Policy Flash 2013-44 Acquisition Guide- Allowability...

    Energy Savers [EERE]

    Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs Attached is...

  11. Dissecting the Cost of the Smart Grid | Open Energy Information

    Open Energy Info (EERE)

    Equivalent URI: cleanenergysolutions.orgcontentdissecting-cost-smart-grid Language: English Policies: Regulations Regulations: "Resource Integration Planning,Cost...

  12. DOE Secretarial Policy Statement on the National Environmental Policy Act |

    Office of Environmental Management (EM)

    Department of Energy Policy Statement on the National Environmental Policy Act DOE Secretarial Policy Statement on the National Environmental Policy Act In this policy statement, the Secretary of Energy directed a number of actions to streamline the NEPA process, minimize the cost and time for document preparation and review, emphasize teamwork, and make the process more useful to decision makers and the public. The Policy Statement requires continuing evaluation of the outcomes of these

  13. Biotrans: Cost Optimization Model | Open Energy Information

    Open Energy Info (EERE)

    URI: cleanenergysolutions.orgcontentbiotrans-cost-optimization-model,http Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration &...

  14. The differential impact of low-carbon technologies on climate change mitigation cost under a range of socioeconomic and climate policy scenarios.

    SciTech Connect (OSTI)

    Barron, Robert W.; McJeon, Haewon C.

    2015-05-01

    This paper considers the effect of several key parameters of low carbon energy technologies on the cost of abatement. A methodology for determining the minimum level of performance required for a parameter to have a statistically significant impact on CO2 abatement cost is developed and used to evaluate the impact of eight key parameters of low carbon energy supply technologies on the cost of CO2 abatement. The capital cost of nuclear technology is found to have the greatest impact of the parameters studied. The cost of biomass and CCS technologies also have impacts, while their efficiencies have little, if any. Sensitivity analysis of the results with respect to population, GDP, and CO2 emission constraint show that the minimum performance level and impact of nuclear technologies is consistent across the socioeconomic scenarios studied, while the other technology parameters show different performance under higher population, lower GDP scenarios. Solar technology was found to have a small impact, and then only at very low costs. These results indicate that the cost of nuclear is the single most important driver of abatement cost, and that trading efficiency for cost may make biomass and CCS technologies more competitive.

  15. Partnership for Economic Policy Modeling and Policy Impact Analysis...

    Open Energy Info (EERE)

    mpia-development-policy-modelingabout-mpia Cost: Free Related Tools Greenhouse Gas and Air Pollution Interactions and Synergies (GAINS) Tool for Selecting CDM Methods &...

  16. Effectiveness of State-Level Policies on Solar Market Development in Different State Contexts

    SciTech Connect (OSTI)

    Steward, D.; Doris, E.; Krasko, V.; Hillman, D.

    2014-02-01

    In response to public interest in customer-sited distributed solar photovoltaics (PV), state and local policymakers have implemented policy initiatives with the goal of encouraging private investment and building a robust PV market. Policymakers face challenges, including limited budgets and incomplete information about the effectiveness of the various policy options in their specific situation, in crafting and executing policy that supports market development goals. Recent work investigated the effect of the order in which policies are implemented (referred to as 'policy stacking') and the presence of low-cost enabling policies, such as interconnection standards and net metering, can have on the success of states in promoting PV markets. Findings indicate that implementation of interconnection standards and policy related to the valuation of excess electricity (e.g., net metering), along with indicators of long term government support for a solar PV market (e.g., RPS) and a non-policy determinant (population), explain about 70% of the variation among states in new PV capacity. This paper builds on that research to determine the most effective policy strategies for different types of states, as determined by their physical, demographic and macroeconomic context. A number of researchers have investigated the effectiveness of state-level policy using various statistical methods to determine relationships between installed solar PV projects and policy initiatives. In this study, the grouping of states by non-policy factors adds dimension to these analyses by identifying how policies function in different non-policy environments.

  17. Startup Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

  18. Queues and Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queues and Policies Queues and Policies Queues and Job Scheduling Jobs must be submitted to a valid Submit Queue. Upon submission the job is routed to the appropriate Torque execution class. Users can not directly access the Torque execution classes. Submit Queue Execution Queue (Do not use in batch script) Nodes Available Processors Max Wallclock Relative Priority (1 being the highest) Run Limit Queued Limit (eligible to run limit) Queue Charge Factor xfer xfer 1 4 6 hrs 3 3 2 1 interactive

  19. Attached is Policy Flash 2013-44 Acquisition Guide- Allowability...

    Broader source: Energy.gov (indexed) [DOE]

    44 Acquisition Guide- Allowability of Incurred Costs Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy...

  20. (Limiting the greenhouse effect)

    SciTech Connect (OSTI)

    Rayner, S.

    1991-01-07

    Traveler attended the Dahlem Research Conference organized by the Freien Universitat, Berlin. The subject of the conference was Limiting the Greenhouse Effect: Options for Controlling Atmospheric CO{sub 2} Accumulation. Like all Dahlem workshops, this was a meeting of scientific experts, although the disciplines represented were broader than usual, ranging across anthropology, economics, international relations, forestry, engineering, and atmospheric chemistry. Participation by scientists from developing countries was limited. The conference was divided into four multidisciplinary working groups. Traveler acted as moderator for Group 3 which examined the question What knowledge is required to tackle the principal social and institutional barriers to reducing CO{sub 2} emissions'' The working rapporteur was Jesse Ausubel of Rockefeller University. Other working groups examined the economic costs, benefits, and technical feasibility of options to reduce emissions per unit of energy service; the options for reducing energy use per unit of GNP; and the significant of linkage between strategies to reduce CO{sub 2} emissions and other goals. Draft reports of the working groups are appended. Overall, the conference identified a number of important research needs in all four areas. It may prove particularly important in bringing the social and institutional research needs relevant to climate change closer to the forefront of the scientific and policy communities than hitherto.

  1. Cost Estimating, Analysis, and Standardization

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1984-11-02

    To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

  2. Strategic Sequencing for State Distributed PV Policies: Program Overviews (Fact Sheet), NREL (National Renewable Energy Laboratory)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    report finds that through strategic policy implementation, governments can successfully support renewable energy even in times when funding is limited. p r o g r a m o v e r v i e w s Strategic Sequencing for State Distributed PV Policies New analysis report aims to help state officials and policymakers expand markets for solar technologies and ultimately reduce the cost of installed solar nationwide In recent years, state and local policymakers have shown increasing interest in developing

  3. User Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy Print 1. Guiding Principles The aim of User Policy at the Advanced Light Source (ALS) is to provide a framework for establishing a challenging yet congenial environment...

  4. Security Policy

    Broader source: Energy.gov [DOE]

    The Office of Security Policy analyzes, develops and interprets safeguards and security policy governing national security functions and the protection of related critical assets entrusted to the...

  5. Web Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Web Policies Web Policies Accessibility The National Energy Research Scientific Computing Center (NERSC) is part of the Lawrence Berkeley National Laboratory (Berkeley Lab), which ...

  6. Web Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies aboutassetsimagesicon-70th.jpg Web Policies LANL places a high degree of ... Contact Us Web Team Email More Like This Bradbury Science Museum Calendar Corporate ...

  7. Survey of State-Level Cost and Benefit Estimates of Renewable Portfolio Standards

    SciTech Connect (OSTI)

    Heeter, J.; Barbose, G.; Bird, L.; Weaver, S.; Flores-Espino, F.; Kuskova-Burns, K.; Wiser, R.

    2014-05-01

    Most renewable portfolio standards (RPS) have five or more years of implementation experience, enabling an assessment of their costs and benefits. Understanding RPS costs and benefits is essential for policymakers evaluating existing RPS policies, assessing the need for modifications, and considering new policies. This study provides an overview of methods used to estimate RPS compliance costs and benefits, based on available data and estimates issued by utilities and regulators. Over the 2010-2012 period, average incremental RPS compliance costs in the United States were equivalent to 0.8% of retail electricity rates, although substantial variation exists around this average, both from year-to-year and across states. The methods used by utilities and regulators to estimate incremental compliance costs vary considerably from state to state and a number of states are currently engaged in processes to refine and standardize their approaches to RPS cost calculation. The report finds that state assessments of RPS benefits have most commonly attempted to quantitatively assess avoided emissions and human health benefits, economic development impacts, and wholesale electricity price savings. Compared to the summary of RPS costs, the summary of RPS benefits is more limited, as relatively few states have undertaken detailed benefits estimates, and then only for a few types of potential policy impacts. In some cases, the same impacts may be captured in the assessment of incremental costs. For these reasons, and because methodologies and level of rigor vary widely, direct comparisons between the estimates of benefits and costs are challenging.

  8. Policy and Regulatory Environment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs » Policy and Regulatory Environment Policy and Regulatory Environment Photo of a man speaking while seated at a table with men and women surrounding him. A favorable policy and regulatory environment is a critical precursor to the development of vibrant solar electric markets, even in the presence of dramatically reduced technology costs. At the federal, state, and local levels, a complex set of interdependent policies define the extent to which renewable energy markets are able to

  9. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    30 - Cost Accounting Standards Administration Policy Flash 2015-05 - Acquisition Letter 2015-02 Acquisition Letter No. AL 2015-02

  10. Subject: Cost and Price Analysis | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Subject: Cost and Price Analysis Subject: Cost and Price Analysis PDF icon Subject: Cost and Price Analysis More Documents & Publications Subject: Cost and Price Analysis Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition Planning in the M&O Environment Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

  11. Policy Flash 2005-53

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2013-40 DATE: March 19, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 43.3 - Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimbursement Contracts for Capital Asset Projects, Environmental Remediation, Decontamination and Decommissioning, Facility Operations, and

  12. User Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy User Policy Print 1. Guiding Principles The aim of User Policy at the Advanced Light Source (ALS) is to provide a framework for establishing a challenging yet congenial environment where talented scientists from different backgrounds can work together in pursuit of the new scientific opportunities presented by the availability of this innovative facility. User policy must address a variety of user needs and sensitivities. On one hand, the qualified researcher with little financial backing

  13. A Framework for Comparative Assessments of Energy Efficiency Policy Measures

    SciTech Connect (OSTI)

    Blum, Helcio; Atkinson, Barbara; Lekov, Alex

    2011-05-24

    When policy makers propose new policies, there is a need to assess the costs and benefits of the proposed policy measures, to compare them to existing and alternative policies, and to rank them according to their effectiveness. In the case of equipment energy efficiency regulations, comparing the effects of a range of alternative policy measures requires evaluating their effects on consumers’ budgets, on national energy consumption and economics, and on the environment. Such an approach should be able to represent in a single framework the particularities of each policy measure and provide comparable results. This report presents an integrated methodological framework to assess prospectively the energy, economic, and environmental impacts of energy efficiency policy measures. The framework builds on the premise that the comparative assessment of energy efficiency policy measures should (a) rely on a common set of primary data and parameters, (b) follow a single functional approach to estimate the energy, economic, and emissions savings resulting from each assessed measure, and (c) present results through a set of comparable indicators. This framework elaborates on models that the U.S. Department of Energy (DOE) has used in support of its rulemakings on mandatory energy efficiency standards. In addition to a rigorous analysis of the impacts of mandatory standards, DOE compares the projected results of alternative policy measures to those projected to be achieved by the standards. The framework extends such an approach to provide a broad, generic methodology, with no geographic or sectoral limitations, that is useful for evaluating any type of equipment energy efficiency market intervention. The report concludes with a demonstration of how to use the framework to compare the impacts estimated for twelve policy measures focusing on increasing the energy efficiency of gas furnaces in the United States.

  14. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  15. Queues and Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queues and Policies Queues and Policies Overview Jobs must be submitted to a valid submit queue. Upon submission the job is routed to the appropriate execution queue. Users can not directly access the execution queues. Submit Queue Execution Queue Nodes Available Cores Max Wallclock Relative Priority Run Limit Eligible Limit Charge Factor* interactive interactive 1-8 1-64 30 mins 1 2 1 1.5 debug debug 1-32 1-256 30 mins 2 2 1 1.5 regular reg_short 1-16 1-128 4 hrs 3 8 4 1.5 reg_small 1-16 1-128

  16. Climate policy implications for agricultural water demand

    SciTech Connect (OSTI)

    Chaturvedi, Vaibhav; Hejazi, Mohamad I.; Edmonds, James A.; Clarke, Leon E.; Kyle, G. Page; Davies, Evan; Wise, Marshall A.; Calvin, Katherine V.

    2013-03-28

    Energy, water and land are scarce resources, critical to humans. Developments in each affect the availability and cost of the others, and consequently human prosperity. Measures to limit greenhouse gas concentrations will inevitably exact dramatic changes on energy and land systems and in turn alter the character, magnitude and geographic distribution of human claims on water resources. We employ the Global Change Assessment Model (GCAM), an integrated assessment model to explore the interactions of energy, land and water systems in the context of alternative policies to limit climate change to three alternative levels: 2.5 Wm-2 (445 ppm CO2-e), 3.5 Wm-2 (535 ppm CO2-e) and 4.5 Wm-2 (645 ppm CO2-e). We explore the effects of two alternative land-use emissions mitigation policy options—one which taxes terrestrial carbon emissions equally with fossil fuel and industrial emissions, and an alternative which only taxes fossil fuel and industrial emissions but places no penalty on land-use change emissions. We find that increasing populations and economic growth could be anticipated to almost triple demand for water for agricultural systems across the century even in the absence of climate policy. In general policies to mitigate climate change increase agricultural demands for water still further, though the largest changes occur in the second half of the century, under both policy regimes. The two policies examined profoundly affected both the sources and magnitudes of the increase in irrigation water demands. The largest increases in agricultural irrigation water demand occurred in scenarios where only fossil fuel emissions were priced (but not land-use change emission) and were primarily driven by rapid expansion in bioenergy production. In these scenarios water demands were large relative to present-day total available water, calling into question whether it would be physically possible to produce the associated biomass energy. We explored the potential of improved water delivery and irrigation system efficiencies. These could potentially reduce demands substantially. However, overall demands remained high under our fossil-fuel-only tax policy. In contrast, when all carbon was priced, increases in agricultural water demands were smaller than under the fossil-fuel-only policy and were driven primarily by increased demands for water by non-biomass crops such as rice. Finally we estimate the geospatial pattern of water demands and find that regions such as China, India and other countries in south and east Asia might be expected to experience greatest increases in water demands. 

  17. COSTS ASSOCIATED WITH WHISTLEBLOWER ACTIONS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A (May, 2014) COSTS ASSOCIATED WITH WHISTLEBLOWER ACTIONS Applicability: This section is applicable to all elements of the Department of Energy including the National Nuclear Security Administration. References: * Section 627 of the Energy Policy Act of 2005, codified at 42 U.S.C. 5853 * DEAR 931.205-47(h), Costs related to legal and other proceedings * DEAR 952.216-7, Allowable cost and payment * DEAR 970.3102-05-47(h), Costs related to legal and other proceedings * DEAR 970.5232-2, Payments

  18. ADR Policy Federal Register | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy Federal Register ADR Policy Federal Register SUMMARY: On October 24, 1995, the Department of Energy (DOE) published an interim Statement of Policy on Alternative Dispute Resolution (ADR) (60 FR 54482) to further its commitment to the use of ADR for resolving issues in controversy in a fair, timely, and cost efficient manner, and to comply with the Administrative Dispute Resolution Act (ADRA), 5 U.S.C. 571 et seq. Today, DOE issues a revised Statement of Policy on Alternative Dispute

  19. ADR Revised Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revised Policy ADR Revised Policy SUMMARY: On October 24, 1995, the Department of Energy (DOE) published an interim Statement of Policy on Alternative Dispute Resolution (ADR) (60 FR 54482) to further its commitment to the use of ADR for resolving issues in controversy in a fair, timely, and cost efficient manner, and to comply with the Administrative Dispute Resolution Act (ADRA), 5 U.S.C. §571 et seq. Today, DOE publishes a revised Statement of Policy on Alternative Dispute Resolution to

  20. User Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    User Policy Print 1. Guiding Principles The aim of User Policy at the Advanced Light Source (ALS) is to provide a framework for establishing a challenging yet congenial environment where talented scientists from different backgrounds can work together in pursuit of the new scientific opportunities presented by the availability of this innovative facility. User policy must address a variety of user needs and sensitivities. On one hand, the qualified researcher with little financial backing needs

  1. BPA's Costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings and Workshops Customer...

  2. Network Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Clear violations of the policy which are not promptly remedied by the offending member organization may result in loss of network access. Depending on the nature of the...

  3. User Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE pricing policy will apply for experiments whose results are not intended for the open literature. In addition, experimenters will be required to open operating or equipment...

  4. Energy Policy

    Broader source: Energy.gov [DOE]

    The Energy Department is focusing on an all-of-the-above energy policy, investing in all sources of American energy.

  5. Policy Notifications

    Broader source: Energy.gov [DOE]

    The Superior Energy Performance® (SEP™) Administrator periodically clarifies or defines SEP program policy and shares this information with SEP participants on this page.

  6. Data Management Policy The

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management Policy The guidelines below describe Data Management procedures, processes and resources that need to be understood by both user projects and in-house research. 1. Limited data management resources. The CNMS has limited data storage resources and storage capacity varies depending upon the instruments used. User data stored at CNMS will only be retained up to three months past the termination date of a user project. There is no lifetime retention. Users are expected to migrate their

  7. Distributed Wind Policy Comparison Tool

    SciTech Connect (OSTI)

    2011-12-01

    Power through Policy: 'Best Practices' for Cost-Effective Distributed Wind is a U.S. Department of Energy (DOE)-funded project to identify distributed wind technology policy best practices and to help policymakers, utilities, advocates, and consumers examine their effectiveness using a pro forma model. Incorporating a customized feed from the Database of State Incentives for Renewables and Efficiency (DSIRE), the Web-based Distributed Wind Policy Comparison Tool (Policy Tool) is designed to assist state, local, and utility officials in understanding the financial impacts of different policy options to help reduce the cost of distributed wind technologies. The Policy Tool can be used to evaluate the ways that a variety of federal and state policies and incentives impact the economics of distributed wind (and subsequently its expected market growth). It also allows policymakers to determine the impact of policy options, addressing market challenges identified in the U.S. DOE’s '20% Wind Energy by 2030' report and helping to meet COE targets.

  8. Measuring it Right: Best Practices in the Selection and Implementation of Cost-Effectiveness Tests

    Broader source: Energy.gov [DOE]

    Presents the National Home Performance Council's cost-effectiveness tests, stakeholder concerns, public policy issues, and best practices.

  9. Cost Analysis: Technology, Competitiveness, Market Uncertainty | Department

    Office of Environmental Management (EM)

    of Energy Technology to Market » Cost Analysis: Technology, Competitiveness, Market Uncertainty Cost Analysis: Technology, Competitiveness, Market Uncertainty As a basis for strategic planning, competitiveness analysis, funding metrics and targets, SunShot supports analysis teams at national laboratories to assess technology costs, location-specific competitive advantages, policy impacts on system financing, and to perform detailed levelized cost of energy (LCOE) analyses. This shows the

  10. CAMD Policy Files

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lists: Caretakers, Accelerator Operators, Shift Operators Building Security: Policy Crane: Directive, Use, Procedure Emergency: Policy, Procedure Experimental Hall: Policy...

  11. Cost of Renewable Energy Spreadsheet Tool (CREST) | Open Energy...

    Open Energy Info (EERE)

    cleanenergysolutions.orgcontentcost-renewable-energy-spreadsheet-too Language: English Policies: Regulations Regulations: Feed-in Tariffs Assess projects, design cost-based...

  12. SF6432-CR (02-01-13) Cost Reimbursement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    labor are authorized as direct charges Control : SF 6432-CR Title: Standard Terms & Conditions for Cost Reimbursement Owner: Procurement Policy Department Release Date: 11...

  13. SF6432-CR (02-01-12) Cost Reimbursement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as direct charges to this contract Control : SF 6432-CR Title: Standard Terms & Conditions for Cost Reimbursement Owner: Procurement Policy & Quality Dept Release Date:...

  14. SF6432-CR (02-01-13) Cost Reimbursement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by Part 931 of the DEAR by a Sandia audit. Control : SF 6432-CR Title: Standard Terms & Conditions for Cost Reimbursement Owner: Procurement Policy Department Release Date: 04...

  15. Quality Policy

    Broader source: Energy.gov [DOE]

    Quality Policy It is the policy of the Department of Energy to establish quality requirements to ensure that risks and environmental impacts are minimized and that safety, reliability, and performance are maximized through the application of effective management systems commensurate with the risks posed by the facility or activity and its work. The Department implements this policy through the QA Order and the QA rule directives to ensure quality assurance requirements are clearly specified for the broad spectrum of work performed by DOE and its contractors.

  16. Transmission line capital costs

    SciTech Connect (OSTI)

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  17. Decommissioning Unit Cost Data

    SciTech Connect (OSTI)

    Sanford, P. C.; Stevens, J. L.; Brandt, R.

    2002-02-26

    The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for decommissioning at other facilities with similar equipment and labor costs. It also provides techniques for extracting information from limited data using extrapolation and interpolation techniques.

  18. Trade-offs of different land and bioenergy policies on the path to achieving climate targets.

    SciTech Connect (OSTI)

    Calvin, Katherine V.; Wise, Marshall A.; Kyle, G. Page; Patel, Pralit L.; Clarke, Leon E.; Edmonds, James A.

    2014-04-16

    Many papers have shown that bioenergy and land-use are potentially important elements in a strategy to limit anthropogenic climate change. But, significant expansion of bioenergy production can have a large terrestrial footprint. In this paper, we test the implications for land use, the global energy system, carbon cycle, and carbon prices of meeting a specific climate target, using a single fossil fuel and industrial sector policy instrument—the carbon tax, but with five alternative bioenergy and land-use policy architectures. We find that the policies we examined have differing effects on the different segments of the economy. Comprehensive land policies can reduce land-use change emissions, increasing allowable emissions in the energy system, but have implications for the cost of food. Bioenergy taxes and constraints, on the other hand, have little effect on food prices, but can result in increased carbon and energy prices.

  19. Chapter 31 - Contract Cost Principles and Procedures | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    1.1_Cost_Reasonableness_0.pdf PDF icon 31.2_Allowable_Food_and_Beverage_Costs_at_DOE_and_Contractor_Sponsored_conferences_0.pdf PDF icon 31.3_Contractor_Legal_Management_Requirements_0.pdf PDF icon 31.4 Allowability of Incurred Costs.pdf More Documents & Publications Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs OPAM Policy Acquisition Guides Microsoft Word - AL2005-12

  20. State Clean Energy Policies Analysis (SCEPA): State Tax Incentives

    SciTech Connect (OSTI)

    Lantz, E.; Doris, E.

    2009-10-01

    As a policy tool, state tax incentives can be structured to help states meet clean energy goals. Policymakers often use state tax incentives in concert with state and federal policies to support renewable energy deployment or reduce market barriers. This analysis used case studies of four states to assess the contributions of state tax incentives to the development of renewable energy markets. State tax incentives that are appropriately paired with complementary state and federal policies generally provide viable mechanisms to support renewable energy deployment. However, challenges to successful implementation of state tax incentives include serving project owners with limited state tax liability, assessing appropriate incentive levels, and differentiating levels of incentives for technologies with different costs. Additionally, state tax incentives may result in moderately higher federal tax burdens. These challenges notwithstanding, state tax incentives that consider certain policy design characteristics can support renewable energy markets and state clean energy goals.The scale of their impact though is directly related to the degree to which they support the renewable energy markets for targeted sectors and technologies. This report highlights important policy design considerations for policymakers using state tax incentives to meet clean energy goals.

  1. GAO Report -- National Environmental Policy Act: Little Information...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    GAO Report -- National Environmental Policy Act: Little Information Exists on NEPA Analyses A report by the United States Government Accountability Office (GAO) on the costs, time ...

  2. Policies and Procedures

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies and Procedures Guidelines Safety Computer Security Conduct of Operations JLF Forms Publication Policy

  3. Use of Cost Estimating Relationships

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

  4. Process Limits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Limits Process Limits Limit Hard Soft core file size (blocks) 0 unlimited data seg size (kbytes) unlimited unlimited scheduling priority 0 0 file size (blocks) unlimited unlimited pending signals 4199424 4199424 max locked memory (kbytes) 32 32 max memory size (kbytes) unlimited unlimited open files 1024 1024 pipe size (512 bytes) 8 8 POSIX message queues (bytes) 819200 819200 real-time priority 0 0 stack size (kbytes) 10240 unlimited cpu time (seconds) unlimited unlimited max user

  5. Policy Overview and Options for Maximizing the Role of Policy in Geothermal Electricity Development

    SciTech Connect (OSTI)

    Doris, E.; Kreycik, C.; Young, K.

    2009-09-01

    Geothermal electricity production capacity has grown over time because of multiple factors, including its renewable, baseload, and domestic attributes; volatile and high prices for competing technologies; and policy intervention. Overarching federal policies, namely the Public Utilities Regulatory Policies Act (PURPA), provided certainty to project investors in the 1980s, leading to a boom in geothermal development. In addition to market expansion through PURPA, research and development policies provided an investment of public dollars toward developing technologies and reducing costs over time to increase the market competitiveness of geothermal electricity. Together, these efforts are cited as the primary policy drivers for the currently installed capacity. Informing policy decisions depends on the combined impacts of policies at the federal and state level on geothermal development. Identifying high-impact suites of policies for different contexts, and the government levels best equipped to implement them, would provide a wealth of information to both policy makers and project developers.

  6. Role of State Policy in Renewable Energy Development

    SciTech Connect (OSTI)

    Doris, E.; Busche, S.; Hockett, S.; McLaren, J.

    2009-07-01

    State policies can support renewable energy development by driving markets, providing certainty in the investment market, and incorporating the external benefits of the technologies into cost/benefit calculations. Using statistical analyses and policy design best practices, this paper quantifies the impact of state-level policies on renewable energy development in order to better understand the role of policy on development and inform policy makers on the policy mechanisms that provide maximum benefit. The results include the identification of connections between state policies and renewable energy development, as well as a discussion placing state policy efforts in context with other factors that influence the development of renewable energy (e.g. federal policy, resource availability, technology cost, public acceptance).

  7. Policies - Cyclotron Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies Policies Web Accessibility Privacy and Security Policy Use of Information Resources Contact Information Texas A&M University College of Science Department of Chemistry ...

  8. Renewable Energy Cost Modeling. A Toolkit for Establishing Cost-Based Incentives in the United States

    SciTech Connect (OSTI)

    Gifford, Jason S.; Grace, Robert C.; Rickerson, Wilson H.

    2011-05-01

    This report serves as a resource for policymakers who wish to learn more about levelized cost of energy (LCOE) calculations, including cost-based incentives. The report identifies key renewable energy cost modeling options, highlights the policy implications of choosing one approach over the other, and presents recommendations on the optimal characteristics of a model to calculate rates for cost-based incentives, FITs, or similar policies. These recommendations shaped the design of NREL's Cost of Renewable Energy Spreadsheet Tool (CREST), which is used by state policymakers, regulators, utilities, developers, and other stakeholders to assist with analyses of policy and renewable energy incentive payment structures. Authored by Jason S. Gifford and Robert C. Grace of Sustainable Energy Advantage LLC and Wilson H. Rickerson of Meister Consultants Group, Inc.

  9. National Policy Assurances - August 2008

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... at 5 CFR part 151, which limits political activity of employees or officers of ... whose services are contributed by a third party as an in-kind contribution toward cost ...

  10. Publication Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Publication Policy Publication of work performed at JLF JLF encourages dissemination of results of experiments performed at the Facility. Vehicles for the publication may include: Journal articles Conference proceedings articles Books or book chapters Technical reports Dissertations Published patents Published abstracts Invited or contributed talks Popular articles Press reports The decision whether to publish and in what form(s) is the responsibility of the Principal Investigator and/or the

  11. Hydrogen Policy and Analyzing the Transition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy and Analyzing the Transition Hydrogen Policy and Analyzing the Transition Presentation at the Renewable Hydrogen Workshop held Nov 16, 2009, in Palm Springs, CA PDF icon renewable_hydrogen_workshop_nov16_leiby.pdf More Documents & Publications Integrated Market Modeling of Hydrogen Transition Scenarios with HyTrans Hydrogen Transition Study Cost and Impacts of Policies

  12. 1998 Cost and Quality Annual

    Gasoline and Diesel Fuel Update (EIA)

    8) Distribution Category UC-950 Cost and Quality of Fuels for Electric Utility Plants 1998 Tables June 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of

  13. COST AND QUALITY TABLES 95

    Gasoline and Diesel Fuel Update (EIA)

    5 Tables July 1996 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Contacts The annual publication Cost

  14. The US uranium industry: Regulatory and policy impediments

    SciTech Connect (OSTI)

    Drennen, T.E.; Glicken, J.

    1995-06-01

    The Energy Policy Act of 1992 required the DOE to develop recommendations and implement government programs to assist the domestic uranium industry in increasing export opportunities. In 1993, as part of that effort, the Office of Nuclear Energy identified several key factors that could (or have) significantly impact(ed) export opportunities for domestic uranium. This report addresses one of these factors: regulatory and policy impediments to the flow of uranium products between the US and other countries. It speaks primarily to the uranium market for civil nuclear power. Changes in the world political and economic order have changed US national security requirements, and the US uranium industry has found itself without the protected market it once enjoyed. An unlevel playing field for US uranium producers has resulted from a combination of geology, history, and a general US political philosophy of nonintervention that precludes the type of industrial policy practiced in other uranium-exporting countries. The US has also been hampered in its efforts to support the domestic uranium-producing industry by its own commitment to free and open global markets and by international agreements such as GATT and NAFTA. Several US policies, including the imposition of NRC fees and licensing costs and Harbor Maintenance fees, directly harm the competitiveness of the domestic uranium industry. Finally, requirements under US law, such as those in the 1979 Nuclear Nonproliferation Act, place very strict limits on the use of US-origin uranium, limitations not imposed by other uranium-producing countries. Export promotion and coordination are two areas in which the US can help the domestic uranium industry without violating existing trade agreements or other legal or policy constraints.

  15. Estimating Specialty Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

  16. State and Local Clean Energy Policy Primer: Getting from Here to Clean Electricity with Policy (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-04-01

    This fact sheet proposes a framework for how states and localities can build policy portfolios by first setting the stage for clean energy in the market with low cost policies, and then growing the market with successive policies until the need for financial incentives can be reduced and eventually eliminated.

  17. Policies | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job Scheduling Policy on BG/Q Job Scheduling Policies on Cooley Pullback Policy Refund Policy Software Policy User Authentication Policy Documentation Feedback Please provide feedback to help guide us as we continue to build documentation for our new computing resource. [Feedback Form] Policies Official policies and procedures of the ALCF.

  18. Comparison of financing costs for wind turbine and fossil powerplants

    SciTech Connect (OSTI)

    Kahn, E.

    1995-02-01

    This paper compares the financing costs of wind turbine powerplants with those of fossil powerplants. The goal of this examination is to determine the extent to which these costs differ and what the sources of such differences may be. The discussion is organized in the following fashion. Section 2 introduces basic terminology and concepts from finance, as they apply in the powerplant setting. Section 3 reviews available data from a variety of sources to estimate the magnitude of the variables identified in Section 2. In Section 4 we examine the effect of the production tax credit enacted in the Energy Policy Act of 1992 on the financing of wind turbine projects. Conclusions are offered in Section 5. In the past two years there have been only two wind turbine projects that have been financed, so the basis for broad conclusions is limited. Nonetheless, there appears to be a significant advantage in financing costs for conventional projects compared to wind turbines. The two sources of disadvantage to wind power are first, the cost of equity capital is significantly more expensive, and second, the capital structure of wind projects has a much greater fraction of expensive equity than conventional alternatives.

  19. Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Challenges | Department of Energy Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges Southern Company: DOE Smart Grid RFI Addressing Policy and Logistical Challenges. Southern recognizes that many policy and logistical concerns must be addressed for the promises of smart grid technologies and applications to be fully realized in ways that are beneficial, secure, and cost-effective

  20. Distributed Wind Policy Comparison Tool | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Distributed Wind Policy Comparison Tool Distributed Wind Policy Comparison Tool Power through Policy: 'Best Practices' for Cost-Effective Distributed Wind is a U.S. Department of Energy (DOE)-funded project to identify distributed wind technology policy best practices and to help policymakers, utilities, advocates, and consumers examine their effectiveness using a pro forma model. Incorporating a customized feed from the Database of State Incentives for Renewables and Efficiency (DSIRE), the

  1. Policy and Analysis Data and Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data and Tools Policy and Analysis Data and Tools Policy and Analysis provides foundational datasets and web-accessible tools for EERE decision-makers and the public covering cost and performance characterizations of EERE technologies, US energy trends, and market and policy conditions for energy technologies. For a comprehensive list of EERE Data and Tools, visit the DOE Open Data Catalog on OpenEI. Resources Policies Database of State Incentives for Renewables and Efficiency (DSIRE) Status and

  2. Policy Building Blocks: Helping Policymakers Determine Policy Staging for the Development of Distributed PV Markets: Preprint

    SciTech Connect (OSTI)

    Doris, E.

    2012-04-01

    There is a growing body of qualitative and a limited body of quantitative literature supporting the common assertion that policy drives development of clean energy resources. Recent work in this area indicates that the impact of policy depends on policy type, length of time in place, and economic and social contexts of implementation. This work aims to inform policymakers about the impact of different policy types and to assist in the staging of those policies to maximize individual policy effectiveness and development of the market. To do so, this paper provides a framework for policy development to support the market for distributed photovoltaic systems. Next steps include mathematical validation of the framework and development of specific policy pathways given state economic and resource contexts.

  3. Refund Policy | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cooley Policies Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job...

  4. User Authentication Policy | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job Scheduling Policy on...

  5. Software Policy | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cooley Policies Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job...

  6. Pullback Policy | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cooley Policies Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job...

  7. Distributed Wind Policy Comparison Tool Guidebook

    SciTech Connect (OSTI)

    Not Available

    2011-11-01

    Power through Policy: 'Best Practices' for Cost-Effective Distributed Wind is a U.S. Department of Energy (DOE)-funded project to identify distributed wind technology policy best practices and to help policymakers, utilities, advocates, and consumers examine their effectiveness using a pro forma model. Incorporating a customized feed from the Database of State Incentives for Renewables and Efficiency (DSIRE), the Web-based Distributed Wind Policy Comparison Tool (Policy Tool) is designed to assist state, local, and utility officials in understanding the financial impacts of different policy options to help reduce the cost of distributed wind technologies. The Policy Tool can be used to evaluate the ways that a variety of federal and state policies and incentives impact the economics of distributed wind (and subsequently its expected market growth). It also allows policymakers to determine the impact of policy options, addressing market challenges identified in the U.S. DOE's '20% Wind Energy by 2030' report and helping to meet COE targets.

  8. Evaluation of Global Onshore Wind Energy Potential and Generation Costs

    SciTech Connect (OSTI)

    Zhou, Yuyu; Luckow, Patrick; Smith, Steven J.; Clarke, Leon E.

    2012-06-20

    In this study, we develop an updated global estimate of onshore wind energy potential using reanalysis wind speed data, along with updated wind turbine technology performance and cost assumptions as well as explicit consideration of transmission distance in the calculation of transmission costs. We find that wind has the potential to supply a significant portion of world energy needs, although this potential varies substantially by region as well as with assumptions such as on what types of land can be used to site wind farms. Total global wind potential under central assumptions is estimated to be approximately 89 petawatt hours per year at less than 9 cents/kWh with substantial regional variations. One limitation of global wind analyses is that the resolution of current global wind speed reanalysis data can result in an underestimate of high wind areas. A sensitivity analysis of eight key parameters is presented. Wind potential is sensitive to a number of input parameters, particularly those related to land suitability and turbine density as well as cost and financing assumptions which have important policy implications. Transmission cost has a relatively small impact on total wind costs, changing the potential at a given cost by 20-30%. As a result of sensitivities studied here we suggest that further research intended to inform wind supply curve development focus not purely on physical science, such as better resolved wind maps, but also on these less well-defined factors, such as land-suitability, that will also have an impact on the long-term role of wind power.

  9. CONTROLLED DOCUMENT OFFICE OF PRIMARY INTEREST (OPI): AVAILABLE ONLINE AT: Office of Cost Estimating and Program Evaluation

    National Nuclear Security Administration (NNSA)

    Cost Estimating and Program Evaluation http://nnsa.energy.gov printed copies are uncontrolled NNSA POLICY LETTER Approved: 2-24-16 Responsibilities for Independent Cost Estimates NATIONAL NUCLEAR SECURITY ADMINISTRATION Office of Cost Estimating and Program Evaluation NAP-28 THIS PAGE INTENTIONALLY LEFT BLANK NAP-28 1 2-24-16 RESPONSIBILITIES FOR INDEPENDENT COST ESTIMATES 1. PURPOSE. To establish policy and responsibilities for conducting Independent Cost Estimates (ICEs) and Independent Cost

  10. Website Policies / Important Links | Geothermal

    Office of Scientific and Technical Information (OSTI)

    Website Policies / Important Links Website Policies / Important Links Javascript Not Enabled OSTI Security Website Policies and Important Links

  11. Website Policies / Important Links | DOEpatents

    Office of Scientific and Technical Information (OSTI)

    Website Policies / Important Links Website Policies / Important Links Javascript Not Enabled OSTI Security Website Policies and Important Links

  12. Website Policies / Important Links | sciencecinema

    Office of Scientific and Technical Information (OSTI)

    Website Policies / Important Links Website Policies / Important Links Javascript Not Enabled OSTI Security Website Policies and Important Links

  13. Internal Policy Library

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    230-1 Monitoring and Recording Conversations BPA Policy 230-2 Reporting Incidents of Fraud, Waste and Abuse BPA Policy 231-2 Power Transacting Risk Management BPA Policy 231-3...

  14. Travel Policy | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy Travel Policy Travel Policy for Contractor Personnel Travel Policy Changes October 1, 2009 Per Diem Adjustments for Meals Memo or EXAMPLE

  15. Report on Transmission Cost Allocation for RTOs and Others (Presentation)

    SciTech Connect (OSTI)

    Coles, L.

    2011-06-01

    Presented at the MARC 2011 Annual Conference, 6 June 2011, Rapid City, South Dakota. This presentation provides an overview of the latest research findings and policy developments pertaining to cost allocation and new variable generation resources on the power grid.

  16. Feed-in Tariff Policy: Design, Implementation, and RPS Policy Interactions

    SciTech Connect (OSTI)

    Cory, K.; Couture, T.; Kreycik, C.

    2009-03-01

    Feed-in tariff (FIT) policies are implemented in more than 40 countries around the world and are cited as the primary reason for the success of the German and Spanish renewable energy markets. As a result of that success, FIT policy proposals are starting to gain traction in several U.S. states and municipalities. Experience from Europe is also beginning to demonstrate that properly designed FITs may be more cost-effective than renewable portfolio standards (RPS), which make use of competitive solicitations. This article explores the design and operation of feed-in tariff policies, including a FIT policy definition, payment-structure options, and payment differentiation. The article also touches on the potential interactions between FIT policies and RPS policies at the state level.

  17. Cost Model and Cost Estimating Software

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

  18. How three smart managers control steam costs

    SciTech Connect (OSTI)

    Kendall, R.

    1982-11-01

    Three steam-intensive companies report innovative ways to reduce steam-production costs. Goodyear Tire and Rubber Co. concentrated on regular maintenance, process modifications, and heat recovery, but also has an on-going policy of seeking further cost savings. Future efforts will explore computer-based boiler controls. Zenith Radio Corporation's color picture tube-making process uses 12% less steam after 700 mechanical steam traps were replaced with fixed-orifice traps. Petro-Tex Chemical Corp. reduced steam costs by monitoring and optimizing process units and by making capital investments to improve steam management. (DCK)

  19. Carbon Lock-in Through Capital Stock Inertia Associated with Weak Near-term Climate Policies

    SciTech Connect (OSTI)

    Bertram, Christoph; Johnson, Nils; Luderer, Gunnar; Riahi, Keywan; Isaac, Morna; Eom, Jiyong

    2015-01-01

    Stringent long-term climate targets necessitate a strict limit on cumulative emissions in this century for which sufficient policy signals are so far lacking. Based on an ensemble of ten energy-economy models, we explore how long-term transformation pathways depend on policies pursued during the next two decades. We find that weak GHG emission targets for 2030 lead, in that year alone, to excess carbon dioxide emissions of nearly half of the annual emissions in 2010, mainly through coal electricity generation. Furthermore, by consuming more of the long-term cumulative emissions budget in the first two decades, weak policy increases the likelihood of overshooting the budget and the urgency of reducing GHG emissions. Therefore, to be successful under weak policies, models must prematurely retire much of the additional coal capacity post-2030 and remove large quantities of carbon dioxide from the atmosphere in the latter half of the century. While increased energy efficiency lowers mitigation costs considerably, even with weak near-term policies, it does not substantially reduce the short term reliance on coal electricity. However, increased energy efficiency does allow the energy system more flexibility in mitigating emissions and, thus, makes the post-2030 transition easier.

  20. Policy Flash 2014-37 Update to the Department of Energy Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts Policy Flash...

  1. Workforce Restructuring Policy

    Broader source: Energy.gov [DOE]

    This document provides revised and consolidated policy and models intended to facilitate contractor workforce restructuring activities.

  2. Data Privacy Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Data Privacy Policy About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board ESCC Acceptable Use Policy Data Privacy Policy Facility Data Policy Career Opportunities ESnet Staff & Org Chart Contact Us Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Data Privacy Policy ESnet Network Data

  3. Facility Data Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facility Data Policy About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board ESCC Acceptable Use Policy Data Privacy Policy Facility Data Policy Career Opportunities ESnet Staff & Org Chart Contact Us Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Facility Data Policy ESnet Data

  4. Governance & Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board ESCC Acceptable Use Policy Data Privacy Policy Facility Data Policy Career Opportunities ESnet Staff & Org Chart Contact Us Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Governance & Policies ESnet is operated by the

  5. Activity Based Costing

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

  6. Renewable Energy Cost Modeling: A Toolkit for Establishing Cost-Based Incentives in the United States; March 2010 -- March 2011

    SciTech Connect (OSTI)

    Gifford, J. S.; Grace, R. C.; Rickerson, W. H.

    2011-05-01

    This report is intended to serve as a resource for policymakers who wish to learn more about establishing cost-based incentives. The report will identify key renewable energy cost modeling options, highlight the policy implications of choosing one approach over the other, and present recommendations on the optimal characteristics of a model to calculate rates for cost-based incentives, feed-in tariffs (FITs), or similar policies. These recommendations will be utilized in designing the Cost of Renewable Energy Spreadsheet Tool (CREST). Three CREST models will be publicly available and capable of analyzing the cost of energy associated with solar, wind, and geothermal electricity generators. The CREST models will be developed for use by state policymakers, regulators, utilities, developers, and other stakeholders to assist them in current and future rate-setting processes for both FIT and other renewable energy incentive payment structures and policy analyses.

  7. 2006 Update of Business Downtime Costs

    SciTech Connect (OSTI)

    Hinrichs, Mr. Doug; Goggin, Mr. Michael

    2007-01-01

    The objective of this paper is to assess the downtime cost of power outages to businesses in the commercial and industrial sectors, updating and improving upon studies that have already been published on this subject. The goal is to produce a study that, relative to existing studies, (1) applies to a wider set of business types (2) reflects more current downtime costs, (3) accounts for the time duration factor of power outages, and (4) includes data on the costs imposed by real outages in a well-defined market. This study examines power outage costs in 11 commercial subsectors and 5 industrial subsectors, using data on downtime costs that was collected in the 1990's. This study also assesses power outage costs for power outages of 20 minutes, 1 hour, and 4 hours duration. Finally, this study incorporates data on the costs of real power outages for two business subsectors. However, the current limited state of data availability on the topic of downtime costs means there is room to improve upon this study. Useful next steps would be to generate more recent data on downtime costs, data that covers outages shorter than 20 minutes duration and longer than 4 hours duration, and more data that is based on the costs caused by real-world outages. Nevertheless, with the limited data that is currently available, this study is able to generate a clear and detailed picture of the downtime costs that are faced by different types of businesses.

  8. DOE Resources Help Measure Building Energy Benchmarking Policy & Program Effectiveness

    Broader source: Energy.gov [DOE]

    The DOE Benchmarking & Transparency Policy and Program Impact Evaluation Handbook provides cost-effective, standardized analytic methods for determining gross and net energy reduction, greenhouse gas (GHG) emissions mitigation, job creation and economic growth impacts.

  9. DOE Announces New Policy for Contractor Benefit Reimbursements

    Broader source: Energy.gov [DOE]

    WASHINGTON , DC - The Department of Energy (DOE) today announced new policy measures for the reimbursement of contractor pension and medical benefit plan costs that are based on sound business...

  10. ESnet Policy Board

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Board About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board Larry Smarr Jagdeep Singh Kristin Rauschenbach Cees de Laat David Foster David Clark Vinton Cerf ESCC Acceptable Use Policy Data Privacy Policy Facility Data Policy Career Opportunities ESnet Staff & Org Chart Contact Us Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems:

  11. Economics, ethics, and climate policy

    SciTech Connect (OSTI)

    Howarth, R.B.; Monahan, P.A.

    1992-11-01

    Are the costs of greenhouse gas emissions abatement justified by the perceived benefits of sustained climate stability Do people of the present generation have a moral right to impose climate risks on their descendants in generations to come This report examines these questions in light of the emergent facts of climate science and their socioeconomic implications. We consider alternative normative criteria for social decision-making with particular emphasis on cost-benefit analysis and the principle of sustainable development. While each framework yields important insights, we argue that the gross uncertainties associated with climate change and the distribution of impacts between present and future generations constrain the usefulness of cost-benefit criteria in evaluating climate policy. If one accepts the ethical proposition that it is morally wrong to impose catastrophic risks on unborn generations when reducing those risks would not noticeably diminish the quality of life of existing persons, a case can be made for concerted policy action to reduce greenhouse gas emissions.

  12. Economics, ethics, and climate policy

    SciTech Connect (OSTI)

    Howarth, R.B.; Monahan, P.A.

    1992-11-01

    Are the costs of greenhouse gas emissions abatement justified by the perceived benefits of sustained climate stability? Do people of the present generation have a moral right to impose climate risks on their descendants in generations to come? This report examines these questions in light of the emergent facts of climate science and their socioeconomic implications. We consider alternative normative criteria for social decision-making with particular emphasis on cost-benefit analysis and the principle of sustainable development. While each framework yields important insights, we argue that the gross uncertainties associated with climate change and the distribution of impacts between present and future generations constrain the usefulness of cost-benefit criteria in evaluating climate policy. If one accepts the ethical proposition that it is morally wrong to impose catastrophic risks on unborn generations when reducing those risks would not noticeably diminish the quality of life of existing persons, a case can be made for concerted policy action to reduce greenhouse gas emissions.

  13. Hydrogen Threshold Cost Calculation

    Broader source: Energy.gov [DOE]

    DOE Hydrogen Program Record number11007, Hydrogen Threshold Cost Calculation, documents the methodology and assumptions used to calculate that threshold cost.

  14. Hydrogen Threshold Cost Calculation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    record documents the methodology and assumptions used to calculate that threshold cost. ... Calculation Methodology and Results: The consumer's cost per mile for the FCEV is set to ...

  15. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Microsoft Word - AcqGuide16pt1 Nov 2010 Chapter 16 - Types of Contracts Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts

  16. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 34 - Major Systems Acquisition Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts Chapter 16 - Types of Contracts

  17. Policy Flash 2016-11 | Department of Energy

    Energy Savers [EERE]

    1 Policy Flash 2016-11 DATE: January 15, 2016 TO: Procurement Directors/Heads of Contracting Activities FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Streamlining DOE's Oversight of Compensation and Benefits SUMMARY: The purpose of Acquisition Letter (AL) 2016-01 is to provide guidance regarding required actions to move from DOE traditional transactional approach for approving certain costs relating to compensation and

  18. Strategic Sequencing for State Distributed PV Policies: A Quantitative Analysis of Policy Impacts and Interactions

    SciTech Connect (OSTI)

    Doris, E.; Krasko, V.A.

    2012-10-01

    State and local policymakers show increasing interest in spurring the development of customer-sited distributed generation (DG), in particular solar photovoltaic (PV) markets. Prompted by that interest, this analysis examines the use of state policy as a tool to support the development of a robust private investment market. This analysis builds on previous studies that focus on government subsidies to reduce installation costs of individual projects and provides an evaluation of the impacts of policies on stimulating private market development.

  19. Benchmarking and Disclosure: State and Local Policy Design Guide and Sample Policy Language

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Benchmarking and Disclosure: State and Local Policy Design Guide and Sample Policy Language Existing Commercial Buildings Working Group May 2012 The State and Local Energy Efficiency Action Network is a state and local effort facilitated by the federal government that helps states, utilities, and other local stakeholders take energy efficiency to scale and achieve all cost-effective energy efficiency by 2020. Learn more at www.seeaction.energy.gov DOE/EE-0733 May 2012 www.seeaction.energy.gov ii

  20. State and Local Clean Energy Policy Primer: Getting from Here to Clean Electricity with Policy (Fact Sheet), NREL (National Renewable Energy Laboratory)

    Broader source: Energy.gov [DOE]

    This fact sheet proposes a framework for how states and localities can build policy portfolios by first setting the stage for clean energy in the market with low cost policies, and then growing the market with successive policies until the need for financial incentives can be reduced and eventually eliminated.

  1. Producing liquid fuels from coal: prospects and policy issues

    SciTech Connect (OSTI)

    James T. Bartis; Frank Camm; David S. Ortiz

    2008-07-01

    The increase in world oil prices since 2003 has prompted renewed interest in producing and using liquid fuels from unconventional resources, such as biomass, oil shale, and coal. This book focuses on issues and options associated with establishing a commercial coal-to-liquids (CTL) industry within the United States. It describes the technical status, costs, and performance of methods that are available for producing liquids from coal; the key energy and environmental policy issues associated with CTL development; the impediments to early commercial experience; and the efficacy of alternative federal incentives in promoting early commercial experience. Because coal is not the only near-term option for meeting liquid-fuel needs, this book also briefly reviews the benefits and limitations of other approaches, including the development of oil shale resources, the further development of biomass resources, and increasing dependence on imported petroleum. A companion document provides a detailed description of incentive packages that the federal government could offer to encourage private-sector investors to pursue early CTL production experience while reducing the probability of bad outcomes and limiting the costs that might be required to motivate those investors. (See Rand Technical Report TR586, Camm, Bartis, and Bushman, 2008.) 114 refs., 2 figs., 16 tabs., 3 apps.

  2. Decoupling Policies: Options to Encourage Energy Efficiency Policies for

    Office of Environmental Management (EM)

    Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL) (Brochure) | Department of Energy Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL) (Brochure) Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory

  3. A chronicle of costs

    SciTech Connect (OSTI)

    Elioff, T.

    1994-04-01

    This report contains the history of all estimated costs associated with the superconducting super collider.

  4. Cost Estimation Package

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

  5. Life Cycle Cost Estimate

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

  6. Policy Memorandum #2 Excepted Service Hiring Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Excepted Service Hiring Policy Policy Memorandum #2 Excepted Service Hiring Policy PDF icon Policy Memorandum #2, Excepted Service Hiring Policy.pdf Responsible Contacts Tiffany Wheeler Human Resources Specialist E-mail tiffany.wheeler@hq.doe.gov Phone (202) 586-8481 More Documents & Publications OFPP Current Issues - Anne Rung, OFPP Administrator Current Trends in Policy - What's new? - Berta Schreiber, Director, Office of Policy, OAPM POLICY GUIDANCE MEMORANDUM #38 EXCEPTION TO POLICY

  7. INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

  8. Decoupling Policies: Options to Encourage Energy Efficiency Policies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Decoupling Policies: Options to Encourage Energy Efficiency Policies for Utilities, Clean Energy Policies in States and Communities, National Renewable Energy Laboratory (NREL)...

  9. POLICY GUIDANCE MEMORANDUM #38 EXCEPTION TO POLICY REGARDING...

    Office of Environmental Management (EM)

    8 EXCEPTION TO POLICY REGARDING QUALITY STEP INCREASES POLICY GUIDANCE MEMORANDUM 38 EXCEPTION TO POLICY REGARDING QUALITY STEP INCREASES This has been rescinded and incorporated...

  10. Climate Mitigation Policy Implications for Global Irrigation Water Demand

    SciTech Connect (OSTI)

    Chaturvedi, Vaibhav; Hejazi, Mohamad I.; Edmonds, James A.; Clarke, Leon E.; Kyle, G. Page; Davies, Evan; Wise, Marshall A.

    2013-08-22

    Energy, water and land are scarce resources, critical to humans. Developments in each affect the availability and cost of the others, and consequently human prosperity. Measures to limit greenhouse gas concentrations will inevitably exact dramatic changes on energy and land systems and in turn alter the character, magnitude and geographic distribution of human claims on water resources. We employ the Global Change Assessment Model (GCAM), an integrated assessment model to explore the interactions of energy, land and water systems in the context of alternative policies to limit climate change to three alternative levels: 2.5 Wm-2 (445 ppm CO2-e), 3.5 Wm-2 (535 ppm CO2-e) and 4.5 Wm-2 (645 ppm CO2-e). We explore the effects of alternative land-use emissions mitigation policy options—one which values terrestrial carbon emissions equally with fossil fuel and industrial emissions, and an alternative which places no penalty on land-use change emissions. We find that increasing populations and economic growth could be anticipated to lead to increased demand for water for agricultural systems (+200%), even in the absence of climate change. In general policies to mitigate climate change will increase agricultural demands for water, regardless of whether or not terrestrial carbon is valued or not. Burgeoning demands for water are driven by the demand for bioenergy in response to emissions mitigation policies. We also find that the policy matters. Increases in the demand for water when terrestrial carbon emissions go un-prices are vastly larger than when terrestrial system carbon emissions are prices at the same rate as fossil fuel and industrial emissions. Our estimates for increased water demands when terrestrial carbon systems go un-priced are larger than earlier studies. We find that the deployment of improved irrigation delivery systems could mitigate some of the increase in water demands, but cannot reverse the increases in water demands when terrestrial carbon emissions go un-priced. Finally we estimates that the geospatial pattern of water demands could stress some parts of the world, e.g. China, India and other countries in south and east Asia, earlier and more intensely than in other parts of the world, e.g. North America.

  11. Chapter 31 - Contract Cost Principles and Procedures | Department of Energy

    Energy Savers [EERE]

    1 - Contract Cost Principles and Procedures Chapter 31 - Contract Cost Principles and Procedures PDF icon 31.1_Cost_Reasonableness_0.pdf PDF icon 31.2_Allowable_Food_and_Beverage_Costs_at_DOE_and_Contractor_Sponsored_conferences_0.pdf PDF icon 31.3_Contractor_Legal_Management_Requirements_0.pdf PDF icon 31.4 Allowability of Incurred Costs.pdf More Documents & Publications OPAM Policy Acquisition Guides Acquisition Letter No. AL 2012-05 Microsoft Word - AL2005-12.doc

  12. Successful Track Record with Diverse Policies (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-05-01

    The Clean Energy Solutions Center helps governments, advisors, and analysts create policies and programs that advance the deployment of clean energy technologies. Through its no-cost offerings, the Solutions Center enables countries to learn from and share policy best practices, data, and analysis tools, creating an international dialogue on clean energy policies that raises global awareness of emerging policy issues and innovations. As part of these efforts, the Solutions Center provides an indispensable service by connecting those seeking policy information and advice with a policy expert who can help them achieve their goals. The Solutions Center's Ask an Expert service matches policymakers with one of the more than 30 global experts selected as authoritative leaders on specific clean energy policy topics.

  13. Office of Security Policy

    Broader source: Energy.gov [DOE]

    The Office of Security Policy is the central source within the Department of Energy for the development and analysis of safeguards and security policies and standards affecting facilities, nuclear materials, personnel, and classified information.

  14. Policies, Manuals & References

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    03-00203-0311.tif-277x300 Key Berkeley Lab Policy Documents Regulations & Procedures Manual (RPM) : The RPM is the primary policy document for Berkeley Lab and links out to many...

  15. Safety Management System Policy

    Energy Savers [EERE]

    Health, Safety and Security U.S. Department of Energy POLICY Washington, D.C. Approved: 4-25-11 SUBJECT: INTEGRATED SAFETY MANAGEMENT POLICY PURPOSE AND SCOPE To establish the Department of Energy's (DOE) expectation for safety, 1 including integrated safety management that will enable the Department's mission goals to be accomplished efficiently while ensuring safe operations at all departmental facilities and activities. This Policy cancels and supersedes DOE Policy (P) 411.1, Safety

  16. FUEL CASK IMPACT LIMITER VULNERABILITIES

    SciTech Connect (OSTI)

    Leduc, D; Jeffery England, J; Roy Rothermel, R

    2009-02-09

    Cylindrical fuel casks often have impact limiters surrounding just the ends of the cask shaft in a typical 'dumbbell' arrangement. The primary purpose of these impact limiters is to absorb energy to reduce loads on the cask structure during impacts associated with a severe accident. Impact limiters are also credited in many packages with protecting closure seals and maintaining lower peak temperatures during fire events. For this credit to be taken in safety analyses, the impact limiter attachment system must be shown to retain the impact limiter following Normal Conditions of Transport (NCT) and Hypothetical Accident Conditions (HAC) impacts. Large casks are often certified by analysis only because of the costs associated with testing. Therefore, some cask impact limiter attachment systems have not been tested in real impacts. A recent structural analysis of the T-3 Spent Fuel Containment Cask found problems with the design of the impact limiter attachment system. Assumptions in the original Safety Analysis for Packaging (SARP) concerning the loading in the attachment bolts were found to be inaccurate in certain drop orientations. This paper documents the lessons learned and their applicability to impact limiter attachment system designs.

  17. Direct/Indirect Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

  18. Energy Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy Energy Policy Energy Policy Offices of the Deputy General Counsel for Energy Policy Civilian Nuclear Programs (GC-72) Office of Standard Contract (GC-73) Electricity and Fossil Energy (GC-76)

  19. Power Plant Cycling Costs

    SciTech Connect (OSTI)

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  20. Policy Memoranda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy Memoranda Policy Memoranda Documents Available for Download August 27, 2015 Policy Memorandum #5 Annual Delegated Examining Reviews This document establishes the Department's requirements for conducting Annual Delegated Examining (DE) Reviews. August 7, 2015 Policy Memorandum #3 Advanced Leave for Childbirth Adoption and Foster Care August 6, 2015 Policy Memorandum #2 Excepted Service Hiring Policy June 5, 2015 POLICY MEMORANDUM #1 Policy and Operating Procedures for Senior Executive

  1. Residential Prosumers: Drivers and Policy Options

    Broader source: Energy.gov [DOE]

    The rise of the solar photovoltaic "prosumers" has the potential to transform the 100-year-old centralized electric utility model into a more decentralized and interactive system. In some countries, it is now more cost-effective for households to produce their own power from PV than to purchase electricity from the grid. However, a prosumer "revolution" under which decentralized adoption of PV occurs on its own, in the absence of supportive policies or regulatory conditions, has not yet arrived. Self-consumption of solar PV is a growing trend globally, but its expansion remains within policy makers’ ability to control and develop.

  2. Clean Energy Policy Analysis: Impact Analysis of Potential Clean Energy Policy Options for the Hawaii Clean Energy Initiative (HCEI)

    SciTech Connect (OSTI)

    Busche, S.; Doris, E.; Braccio, R.; Lippert, D.; Finch, P.; O'Toole, D.; Fetter, J.

    2010-04-01

    This report provides detailed analyses of 21 clean energy policy options considered by the Hawaii Clean Energy Initiative working groups for recommendation to the 2010 Hawaii State Legislature. The report considers the impact each policy may have on ratepayers, businesses, and the state in terms of energy saved, clean energy generated, and the financial costs and benefits. The analyses provide insight into the possible impacts, both qualitative and quantitative, that these policies may have in Hawaii based on the experience with these policies elsewhere. As much as possible, the analyses incorporate Hawaii-specific context to reflect the many unique aspects of energy use in the State of Hawaii.

  3. New Database from NREL Makes Costs of Energy Technologies More Transparent

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    - News Releases | NREL New Database from NREL Makes Costs of Energy Technologies More Transparent July 16, 2012 A new web application collects cost and performance estimates for electric generation, advanced vehicles, and renewable fuel technologies and makes them available for utilities, policy makers, consumers, and academics. The Transparent Cost Database (TCDB) app provides technology cost and performance estimates that can be used to benchmark company costs, model energy scenarios, and

  4. Data Policy | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policies Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job Scheduling Policy on BG/Q Job Scheduling Policies on Cooley Pullback Policy Refund Policy Software Policy User Authentication Policy Documentation Feedback Please provide feedback to help guide us as we continue to build documentation for our new computing resource. [Feedback Form] Data Policy Contents ALCF Data

  5. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 DATE: February 12, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Standardized Cost Savings Definitions and Reporting Template - Update SUMMARY: In September 2012, DOE issued Policy Flash 2012-67, Acquisition Savings Reporting Template Guidance to fully comply with reporting requirements. This is an update to that Policy Flash. The Department has reviewed the questions and

  6. ORISE: Policy Implementation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    at ensuring compliance with federal and DOE regulations pertaining to the protection of human subjects participating in research. The Federal Policy for the Protection of Human...

  7. Departmental Directives Program Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-08-16

    The Policy provides formal and organized communication of the Department's expectations for performance of work within the DOE complex. Cancels DOE P 251.1

  8. Policy and Reporting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Skip navigation links BPA Energy Efficiency Plan BPA Post-2011 EE Role Implementation Manual Archives IM Document Library Interim Solution 2.0 Files Low Income Efficiency Policy &...

  9. Tribal Utility Policy Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Policy Issues New Mexico July 27, 2015 Margaret ... *US Energy Information Administration New ... nation in utility-scale electricity generation from solar ...

  10. Queues and Scheduling Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Software Policies User Surveys NERSC Users Group User Announcements Help Staff Blogs Request Repository Mailing List Operations for: Passwords & Off-Hours Status...

  11. DOE Policies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Policies DOE Policies DOE Policies The CIO defines IT processes and policies using the Common Baseline for IT Management, consistent with OMB M-15-14. Access policy documents from the list below: Information Management Planning DOE Guide to IT Capital Planning and Investment, September 2016(pdf) DOE G 242.1-1, Forms Management Guide (pdf) Web Domain Name Policy REFERENCE NUMBER POLICY NAME APPROVED DATE DESCRIPTION DOE O 200.1A Information Technology Management Dec 23, 2008 Implementation

  12. Benchmarking for Cost Improvement. Final report

    SciTech Connect (OSTI)

    Not Available

    1993-09-01

    The US Department of Energy`s (DOE) Office of Environmental Restoration and Waste Management (EM) conducted the Benchmarking for Cost Improvement initiative with three objectives: Pilot test benchmarking as an EM cost improvement tool; identify areas for cost improvement and recommend actions to address these areas; provide a framework for future cost improvement. The benchmarking initiative featured the use of four principal methods (program classification, nationwide cost improvement survey, paired cost comparison and component benchmarking). Interested parties contributed during both the design and execution phases. The benchmarking initiative was conducted on an accelerated basis. Of necessity, it considered only a limited set of data that may not be fully representative of the diverse and complex conditions found at the many DOE installations. The initiative generated preliminary data about cost differences and it found a high degree of convergence on several issues. Based on this convergence, the report recommends cost improvement strategies and actions. This report describes the steps taken as part of the benchmarking initiative and discusses the findings and recommended actions for achieving cost improvement. The results and summary recommendations, reported below, are organized by the study objectives.

  13. High Energy Cost Grants

    Broader source: Energy.gov [DOE]

    The High Energy Cost Grant Program provides financial assistance for the improvement of energy generation, transmission, and distribution facilities servicing eligible rural communities with home...

  14. Workplace Charging Installation Costs

    Broader source: Energy.gov [DOE]

    Installation costs and services vary considerably, so employers are encouraged to obtain a number of quotes before moving forward with any installation. An initial site investigation should include:

  15. SOFT COST GRAND CHALLENGE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    energycenter.org California Center for Sustainable Energy Soft Cost Grand Challenge May 22, 2014 Accelerating the transition to a sustainable world powered by clean energy 2...

  16. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Choose a vehicle to compare fuel cost and emissions with a conventional vehicle. Select Fuel/Technology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Propane (LPG) Next Vehicle Cost Calculator Vehicle 0 City 0 Hwy (mi/gal) 0 City 0 Hwy (kWh/100m) Gasoline Vehicle 0 City 0 Hwy (mi/gal) Normal Daily Use 30.5 Total miles/day City 55 % Hwy 45 % Other Trips 3484 Total miles/year City 20 % Hwy 80 % Fuel Cost Emissions Annual Fuel Cost $ $/gal Annual

  17. Transportation Energy Futures Series. Non-Cost Barriers to Consumer Adoption of New Light-Duty Vehicle Technologies

    SciTech Connect (OSTI)

    Stephens, Thomas

    2013-03-01

    Consumer preferences are key to the adoption of new vehicle technologies. Barriers to consumer adoption include price and other obstacles, such as limited driving range and charging infrastructure; unfamiliarity with the technology and uncertainty about direct benefits; limited makes and models with the technology; reputation or perception of the technology; standardization issues; and regulations. For each of these non-cost barriers, this report estimates an effective cost and summarizes underlying influences on consumer preferences, approximate magnitude and relative severity, and assesses potential actions, based on a comprehensive literature review. While the report concludes that non-cost barriers are significant, effective cost and potential market share are very uncertain. Policies and programs including opportunities for drivers to test drive advanced vehicles, general public outreach and information programs, incentives for providing charging and fueling infrastructure, and development of technology standards were examined for their ability to address barriers, but little quantitative data exists on the effectiveness of these measures. This is one in a series of reports produced as a result of the Transportation Energy Futures project, a Department of Energy-sponsored multi-agency effort to pinpoint underexplored strategies for reducing GHGs and petroleum dependence related to transportation. View all reports on the TEF Web page, http://www.eere.energy.gov/analysis/transportationenergyfutures/index.html.

  18. Transportation Energy Futures Series: Non-Cost Barriers to Consumer Adoption of New Light-Duty Vehicle Technologies

    SciTech Connect (OSTI)

    Stephens, T.

    2013-03-01

    Consumer preferences are key to the adoption of new vehicle technologies. Barriers to consumer adoption include price and other obstacles, such as limited driving range and charging infrastructure; unfamiliarity with the technology and uncertainty about direct benefits; limited makes and models with the technology; reputation or perception of the technology; standardization issues; and regulations. For each of these non-cost barriers, this report estimates an effective cost and summarizes underlying influences on consumer preferences, approximate magnitude and relative severity, and assesses potential actions, based on a comprehensive literature review. While the report concludes that non-cost barriers are significant, effective cost and potential market share are very uncertain. Policies and programs including opportunities for drivers to test drive advanced vehicles, general public outreach and information programs, incentives for providing charging and fueling infrastructure, and development of technology standards were examined for their ability to address barriers, but little quantitative data exists on the effectiveness of these measures. This is one in a series of reports produced as a result of the Transportation Energy Futures project, a Department of Energy-sponsored multi-agency effort to pinpoint underexplored strategies for reducing GHGs and petroleum dependence related to transportation.

  19. Part II: Section B - Supplies, Services, and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    B SUPPLIES AND SERVICES AND PRICE/COSTS DE-AC36-08GO28308 Modification M938 Section B - ii PART I SECTION B SUPPLIES AND SERVICES AND PRICE/COSTS TABLE OF CONTENTS B.1 Service Being Acquired ......................................................................................... 1 B.2 Obligation of Funds and Financial Limitations ...................................................... 1 B.3 Transition Cost, Estimated Costs and Maximum Available Fee ............................ 1 B.4 Allowability

  20. Financing investments in renewable energy: The role of policy design and restructuring

    SciTech Connect (OSTI)

    Wiser, R.; Pickle, S.

    1997-03-01

    The costs of electric power projects utilizing renewable energy technologies are highly sensitive to financing terms. Consequently, as the electricity industry is restructured and new renewables policies are created, it is important for policymakers to consider the impacts of renewables policy design on project financing. This report describes the power plant financing process and provides insights to policymakers on the important nexus between renewables policy design and finance. A cash-flow model is used to estimate the impact of various financing variables on renewable energy costs. Past and current renewable energy policies are then evaluated to demonstrate the influence of policy design on the financing process and on financing costs. The possible impacts of electricity restructuring on power plant financing are discussed and key design issues are identified for three specific renewable energy programs being considered in the restructuring process: (1) surcharge-funded policies; (2) renewables portfolio standards; and (3) green marketing programs. Finally, several policies that are intended to directly reduce financing costs and barriers are analyzed. The authors find that one of the key reasons that renewables policies are not more effective is that project development and financing processes are frequently ignored or misunderstood when designing and implementing renewable energy incentives. A policy that is carefully designed can reduce renewable energy costs dramatically by providing revenue certainty that will, in turn, reduce financing risk premiums.

  1. Global warming policy: A coherent-sequential approach

    SciTech Connect (OSTI)

    Manicke, R.L.

    1996-12-31

    This paper addresses these two closely related themes: (1) the need for structuring and evaluating global climate policy sequentially and (2) the need to incorporate the analysis of real options which may contribute significantly to global climate policy. This paper is organized into four sections. The first section deals with benefit-cost analysis and capital budgeting as they are generally practiced and discusses the reasons why the traditional benefit-cost formulation is inadequate. The second section then discusses the case of one financial option, namely, the European Call Option and discusses some important results. The third section of the paper addresses some of the important results or principles derived in the literature on real options, and while most of the mathematics is not easily transferred nor relevant to the global climate policy, there are many principles that can be applied. In the fourth section the author discusses the implications of a real option environment for the policy process.

  2. Website Policies / Important Links | DOE PAGES

    Office of Scientific and Technical Information (OSTI)

    Website Policies / Important Links Website Policies / Important Links Javascript Not Enabled OSTI Security Website Policies and Important Links

  3. Website Policies / Important Links | Data Explorer

    Office of Scientific and Technical Information (OSTI)

    Website Policies / Important Links Website Policies / Important Links Javascript Not Enabled OSTI Security Website Policies and Important Links

  4. State Clean Energy Policies Analysis (SCEPA): State Policy and...

    Open Energy Info (EERE)

    Analysis (SCEPA): State Policy and the Pursuit of Renewable Energy Manufacturing Jump to: navigation, search Tool Summary LAUNCH TOOL Name: State Clean Energy Policies Analysis...

  5. E-Commerce Policies- Purpose

    Broader source: Energy.gov [DOE]

    To establish policies for the use of the Strategic Integrated Procurement Enterprise System (referred to as "STRIPES"). These policies supplement the DOE policies for the use of the Government...

  6. Riverside County- Sustainable Building Policy

    Broader source: Energy.gov [DOE]

    In February 2009, the County of Riverside Board of Supervisors adopted Policy Number H-29, creating the Sustainable Building Policy. The Policy requires that all new county building projects...

  7. Form:Policy Organization | Open Energy Information

    Open Energy Info (EERE)

    Policy Organization Jump to: navigation, search Add a Policy Organization Input your policy organization name below to add to the registry. If your policy organization is already...

  8. Small Business First Policy

    Energy Savers [EERE]

    U.S. Department of Energy POLICY Washington, D.C. DOE P 547.1 Approved: 12-14-2012 SUBJECT: SMALL BUSINESS FIRST POLICY PURPOSE AND SCOPE To establish a Small Business First Policy that: (1) Enforces compliance with the Small Business Act (Public Law 85-536, as amended), Small Business Jobs Act of 2010, and other applicable laws, Executive Orders, regulations and best business practices. (2) Ensures prime contracting opportunities are available to the maximum extent practicable to small business

  9. Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014-2018

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Goal Focused on Cost Savings | Department of Energy 9 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings Questions concerning this policy flash should be directed to Scott Clemons of the Strategic Programs Division, Office of Contract Management, at (202) 287-1554 or at Scott.Clemons@hq.doe.gov. PDF icon Policy Flash 2014-39.pdf PDF

  10. Policy Flash 2012-57

    Broader source: Energy.gov (indexed) [DOE]

    Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Communication to All Department of Energy Contractors SUMMARY:...

  11. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: OFPP Myth-busting 2 Memorandum SUMMARY: The Office of Federal...

  12. Policy Flash 2012-68

    Broader source: Energy.gov (indexed) [DOE]

    DATE: September 21, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance...

  13. Policy Flash 2012-59

    Broader source: Energy.gov (indexed) [DOE]

    6, 2012 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance...

  14. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    DATE: April 09, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management...

  15. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    DATE: April 17, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management...

  16. Policy Flash 2012-58

    Broader source: Energy.gov (indexed) [DOE]

    , 2012 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance...

  17. Policy Flash 2012-56

    Broader source: Energy.gov (indexed) [DOE]

    56 DATE: July 27, 2012 TO: Procurement Directors FROM: Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT:...

  18. Policy Flash 2012-66

    Broader source: Energy.gov (indexed) [DOE]

    September 19, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT:...

  19. NREL: Energy Analysis - Policy Analysis

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the effects that policy has on renewable energy project financing and development. ... access the financial policy page or the NREL Renewable Energy Project Finance website. ...

  20. Evaluating Energy Efficiency Policies with Energy-Economy Models

    SciTech Connect (OSTI)

    Mundaca, Luis; Neij, Lena; Worrell, Ernst; McNeil, Michael A.

    2010-08-01

    The growing complexities of energy systems, environmental problems and technology markets are driving and testing most energy-economy models to their limits. To further advance bottom-up models from a multidisciplinary energy efficiency policy evaluation perspective, we review and critically analyse bottom-up energy-economy models and corresponding evaluation studies on energy efficiency policies to induce technological change. We use the household sector as a case study. Our analysis focuses on decision frameworks for technology choice, type of evaluation being carried out, treatment of market and behavioural failures, evaluated policy instruments, and key determinants used to mimic policy instruments. Although the review confirms criticism related to energy-economy models (e.g. unrealistic representation of decision-making by consumers when choosing technologies), they provide valuable guidance for policy evaluation related to energy efficiency. Different areas to further advance models remain open, particularly related to modelling issues, techno-economic and environmental aspects, behavioural determinants, and policy considerations.

  1. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and Renewable Energy Get Widget Code...

  2. Workplace Charging Equipment Costs

    Broader source: Energy.gov [DOE]

    Charging stations are available from a variety of manufacturers in a range of models for all charging applications. For a single port charging station, Level 1 hardware costs range from $300-$1,500...

  3. Estimating Renewable Energy Costs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

  4. INDEPENDENT COST REVIEW (ICR)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Report SOP Standard Operating Procedure TEC Total Estimated Cost TIPR Technical ... FY13 FY14 FY15 FY16 Total PED Construction TEC OPC TPC Note: above values include MR...

  5. System Cost Model

    Energy Science and Technology Software Center (OSTI)

    1996-03-27

    SCM is used for estimation of the life-cycle impacts (costs, health and safety risks) of waste management facilities for mixed low-level, low-level, and transuranic waste. SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing waste management facilities at Department of Energy (DOE) installations. SCM also provides transportation costs for intersite transfer of DOE wastes. SCM covers the entire DOE waste management complex tomore » allow system sensitivity analysis including: treatment, storage, and disposal configuration options; treatment technology selection; scheduling options; transportation options; waste stream and volume changes; and site specific conditions.« less

  6. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

  7. Cost Estimating Guide

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates.

  8. Hall Ammendment Policy

    Broader source: Energy.gov [DOE]

    Joint statement providing interim policy on processing proposals for leasing DOE real property using the authority in 42 U.S.C. 7256, commonly referred to as the "Hall Amendment."

  9. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Choose a vehicle to compare fuel cost and emissions with a conventional vehicle. Select Fuel/Technology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Next Vehicle Cost Calculator Update Your Widget Code This widget version will stop working on March 31. Update your widget code. × Widget Code Select All Close U.S. Department of Energy Energy Efficiency and Renewable Energy

  10. ORISE: Policy Implementation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Policy Implementation The Oak Ridge Institute for Science and Education (ORISE) assists the U.S. Department of Energy (DOE) Office of Science in the implementation of its program directed at ensuring compliance with federal and DOE regulations pertaining to the protection of human subjects participating in research. The Federal Policy for the Protection of Human Subjects was adopted by DOE on June 18, 1991, as Title 10 Code of Federal Regulations 745, Protection of Human Subjects, and expressed

  11. Queues and Scheduling Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Queues and Policies Queues and Scheduling Policies Users submit jobs to a submit queue and wait in line until nodes become available to run a job. NERSC's queue structures are intended to be fair and to allow jobs of various sizes to run efficiently. Balancing the job size and throughput requirements of a large number of users is always a challenge. We encourage users to send questions, feedback, or concerns about the queue structures, to the consultants. Queue Classes Submit Queue Execution

  12. Policy Flash 2013-76 Term Assignments of Contractors to the DC Area |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy 6 Term Assignments of Contractors to the DC Area Policy Flash 2013-76 Term Assignments of Contractors to the DC Area Questions concerning this policy flash should be directed to A Scott Geary of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1507 or at Andrew.Geary@hq.doe.gov. PDF icon POLICY_FLASH_Address IG finding Cost and justification of assignments.pdf More Documents &

  13. POLICY MEMORANDUM #1 Policy and Operating Procedures for Senior Executive

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Service (SES) Performance Management System | Department of Energy MEMORANDUM #1 Policy and Operating Procedures for Senior Executive Service (SES) Performance Management System POLICY MEMORANDUM #1 Policy and Operating Procedures for Senior Executive Service (SES) Performance Management System PDF icon Policy Memo #1-SES Performance Policy and Operating Procedures Responsible Contacts Erin Moore Deputy Director, Office of Executive Resources E-mail Erin.Moore@hq.doe.gov Phone (202) 586-9558

  14. What does the 2°C Target Imply for a Global Climate Agreement in 2020? The LIMITS Study on Durban Action Platform Scenarios

    SciTech Connect (OSTI)

    Kriegler, Elmar; Tavoni, Massimo; Aboumahboub, Tino; Luderer, Gunnar; Calvin, Katherine V.; DeMaere, Gauthier; Krey, Volker; Riahi, Keywan; Rosler, Hilke; Schaeffer, Michiel; Van Vuuren, Detlef

    2013-11-01

    This paper provides a novel and comprehensive model?based assessment of possible outcomes of the Durban Platform negotiations with a focus on emissions reduction requirements, the consistency with the 2°C target and global economic impacts. The Durban Action scenarios investigated in the LIMITS study—all assuming the implementation of comprehensive global emission reductions after 2020, but assuming different 2020 emission reduction levels and different long?term stabilization targets—show that the probability of exceeding the 2°C limit increases with stabilization target from below one third for 450?470 ppm to 40?60% for 490?510 ppm in 2100. Global time?averaged economic costs of the Durban Action scenarios are limited across models, and are largely unaffected by the stringency of 2020 pledges. By contrast, the economic impact of delaying action beyond 2030 is much stronger on transitional costs. The main significance of short term action in the period 2010?2030 lies in preparing the ground for steep emissions reductions thereafter by inducing global emissions to peak and decline. The institutional challenges of all scenarios with fragmented near?term climate policy can be expected to be high as reflected in a steep rise of carbon prices and decarbonization rates until 2040. We conclude that an agreement on comprehensive emissions reductions to be implemented from 2020 onwards has particular significance for meeting long term climate policy objectives.

  15. Factory Cost Model

    Energy Science and Technology Software Center (OSTI)

    1996-12-17

    The Factory Cost Model (FCM) is an economic analysis tool intended to provide flat panel display (FPD) and other similar discrete component manufacturers with the ability to make first-order estimates of the cost of unit production. This software has several intended uses. Primary among these is the ability to provide first-order economic analysis for future factories. Consequently, the model requires a minimal level of input detail, and accomodates situations where actual production data are notmore » available. This software is designed to be activity based such that most of the calculated direct costs are associated with the steps of a manufacturibg process. The FCM architecture has the ability to accomodate the analysis of existing manufacturing facilities. The FCM can provide assistance with strategic economic decisions surrounding production related matters. For instance, the program can project the effect on costs and resources of a new product''s introduction, or it can assess the potential cost reduction produced by step yield improvements in the manufacturing process.« less

  16. Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation...

    Office of Environmental Management (EM)

    13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement Costs Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement...

  17. QGESS: Capital Cost Scaling Methodology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the tonnes of CO2 utilized. The costs of the process are to include infrastructure, raw materials, processing, byproduct disposal, and utilities costs, as well as any other costs....

  18. Factors Impacting Decommissioning Costs - 13576

    SciTech Connect (OSTI)

    Kim, Karen; McGrath, Richard

    2013-07-01

    The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

  19. Low Cost, Durable Seal

    SciTech Connect (OSTI)

    Roberts, George; Parsons, Jason; Friedman, Jake

    2010-12-17

    Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

  20. Social cost impact assessment of pipeline infrastructure projects

    SciTech Connect (OSTI)

    Matthews, John C.; Allouche, Erez N.; Sterling, Raymond L.

    2015-01-15

    A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

  1. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 DATE: October 16, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ACQUISITION LETTER 2014-01: MANAGEMENT AND OPERATING CONTRACTORS' AUDIT COVERAGE OF COST-REIMBURSEMENT SUBCONTRACTS SUMMARY: The subject Acquisition Letter's purpose is to achieve greater Department-wide emphasis on auditing cost type subcontracts by providing guidance for monitoring management and operating

  2. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 DATE: April 11, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ACQUISITION GUIDE CHAPTER 31.4: ALLOWABLILITY OF INCURRED COSTS SUMMARY: A new chapter (31.4) has been added to the Acquisition Guide. It discusses determining the allowability of incurred costs, emphasizing the five FAR requirements, especially the reasonableness requirement. This Flash will be available online

  3. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13 DATE: January 07, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS SUMMARY: The subject Acquisition Letter's purpose is to provide guidance to Contracting Officers on allowability of contractor litigation defense and settlement costs in light of Secretary of the Army v. Tecom. The

  4. Heliostat cost reduction study.

    SciTech Connect (OSTI)

    Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

    2007-06-01

    Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

  5. TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 DATE: October 18, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter on Contractor Domestic Extended Personnel Assignments SUMMARY: The attached Acquisition Letter has been issued to provide guidance on the Department's policy governing reimbursement of costs associated with contractor domestic extended personnel assignments. This Flash will be available

  6. Shortening the path to energy independence: a policy agenda to commercialize Battery-Electric vehicles

    SciTech Connect (OSTI)

    Fontaine, Peter J.

    2008-07-15

    A key to accelerating the adoption of BEVs is to reduce their incremental cost by monetizing their lifetime CO{sub 2} reduction benefits, spreading the risk of technology failure efficiently, and treating them equally with other alternative fuels in the existing fuel diversification federal policy framework. Six policy changes may help. (author)

  7. Effective O&M Policy in Public Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Effective O&M Policy in Public Buildings Effective O&M Policy in Public Buildings This webinar covered effective operations and maintenance in public buildings. Transcript PDF icon Presentation More Documents & Publications Preparing for the Arrival of Electric Vehicle Low-to-No Cost Strategy for Energy Efficiency in Public Buildings Energy Code Compliance and Enforcement Best Practices

  8. Limited Test Ban Treaty

    National Nuclear Security Administration (NNSA)

    Detection System (USNDS), which monitors compliance with the international Limited Test Ban Treaty (LTBT). The LTBT, signed by 108 countries, prohibits nuclear testing in the...

  9. Pareto Efficient Policy for Supervisory Power Management Control

    SciTech Connect (OSTI)

    Malikopoulos, Andreas

    2015-01-01

    n this paper we address the problem of online optimization of the supervisory power management control in parallel hybrid electric vehicles (HEVs). We model HEV opera- tion as a controlled Markov chain using the long-run expected average cost per unit time criterion, and we show that the control policy yielding the Pareto optimal solution minimizes the average cost criterion online. The effectiveness of the proposed solution is validated through simulation and compared to the solution derived with dynamic programming using the average cost criterion.

  10. INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operating Procedures | Department of Energy INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures PDF icon ICR_ICE SOP_Sep 2013_Final.pdf More Documents & Publications ICR-ICE Standard Operating Procedures (Update Sept 2013) Contractor SOW Template - ICR Contractor SOW Template - ICE

  11. Cori Queues and Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Physical Cores Max Walltime Run Limit Total Nodes Limit Submit Limit Relative Priority debug 1-128 1-4,096 30 min 1 128 5 2 regular 1-2 1-64 24 hrs 50 100 200 4 3-512 65-16,384 24...

  12. Integrated Safety Management Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25

    The policy establishes DOE's expectation for safety, including integrated safety management that will enable the Department’s mission goals to be accomplished efficiently while ensuring safe operations at all departmental facilities and activities. Supersedes DOE P 450.4, DOE P 411.1, DOE P 441.1, DOE P 450.2A, and DOE P 450.7

  13. Policy Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Procurement and Acquisition » Policy Flashes Policy Flashes The following is a list of Policy Flashes issued by the Office of Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat,

  14. POLICY MEMORANDUM #1 Policy and Operating Procedures for Senior...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Policy Memo 1-SES Performance Policy and Operating Procedures Responsible Contacts Erin Moore Deputy Director, Office of Executive Resources E-mail Erin.Moore@hq.doe.gov ...

  15. Policy modeling for industrial energy use

    SciTech Connect (OSTI)

    Worrell, Ernst; Park, Hi-Chun; Lee, Sang-Gon; Jung, Yonghun; Kato, Hiroyuki; Ramesohl, Stephan; Boyd, Gale; Eichhammer, Wolfgang; Nyboer, John; Jaccard, Mark; Nordqvist, Joakim; Boyd, Christopher; Klee, Howard; Anglani, Norma; Biermans, Gijs

    2003-03-01

    The international workshop on Policy Modeling for Industrial Energy Use was jointly organized by EETA (Professional Network for Engineering Economic Technology Analysis) and INEDIS (International Network for Energy Demand Analysis in the Industrial Sector). The workshop has helped to layout the needs and challenges to include policy more explicitly in energy-efficiency modeling. The current state-of-the-art models have a proven track record in forecasting future trends under conditions similar to those faced in the recent past. However, the future of energy policy in a climate-restrained world is likely to demand different and additional services to be provided by energy modelers. In this workshop some of the international models used to make energy consumption forecasts have been discussed as well as innovations to enable the modeling of policy scenarios. This was followed by the discussion of future challenges, new insights in the data needed to determine the inputs into energy model s, and methods to incorporate decision making and policy in the models. Based on the discussion the workshop participants came to the following conclusions and recommendations: Current energy models are already complex, and it is already difficult to collect the model inputs. Hence, new approaches should be transparent and not lead to extremely complex models that try to ''do everything''. The model structure will be determined by the questions that need to be answered. A good understanding of the decision making framework of policy makers and clear communication on the needs are essential to make any future energy modeling effort successful. There is a need to better understand the effects of policy on future energy use, emissions and the economy. To allow the inclusion of policy instruments in models, evaluation of programs and instruments is essential, and need to be included in the policy instrument design. Increased efforts are needed to better understand the effects of innovative (no n-monetary) policy instruments through evaluation and to develop approaches to model both conventional and innovative policies. The explicit modeling of barriers and decision making in the models seems a promising way to enable modeling of conventional and innovative policies. A modular modeling approach is essential to not only provide transparency, but also to use the available resources most effectively and efficiently. Many large models have been developed in the past, but have been abandoned after only brief periods of use. A development path based on modular building blocks needs the establishment of a flexible but uniform modeling framework. The leadership of international agencies and organizations is essential in the establishment of such a framework. A preference is given for ''softlinks'' between different modules and models, to increase transparency and reduce complexity. There is a strong need to improve the efficiency of data collection and interpretation efforts to produce reliable model inputs. The workshop participants support the need for the establishment of an (in-)formal exchanges of information, as well as modeling approaches. The development of an informal network of research institutes and universities to help build a common dataset and exchange ideas on specific areas is proposed. Starting with an exchange of students would be a relative low-cost way to start such collaboration. It would be essential to focus on specific topics. It is also essential to maintain means of regular exchange of ideas between researchers in the different focus points.

  16. POLICY GUIDANCE MEMORANDUM #38 EXCEPTION TO POLICY REGARDING QUALITY STEP

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    INCREASES | Department of Energy 8 EXCEPTION TO POLICY REGARDING QUALITY STEP INCREASES POLICY GUIDANCE MEMORANDUM #38 EXCEPTION TO POLICY REGARDING QUALITY STEP INCREASES This has been rescinded and incorporated into DOE Order 331.C admin change 3: regarding the discretionary approvals of Quality Step Increases (QSIs) and Quality Increases (QIs) when an employee received a Within Grade Increase (WGI) during the annual performance cycle. PDF icon Policy Guidance Memo #38.pdf Responsible

  17. 10 CFR 1021 -- National Environmental Policy Act Implementing Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1021 -- NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Subpart A -- General Sec. 1021.100 Purpose. 1021.101 Policy. 1021.102 Applicability. 1021.103 Adoption of CEQ NEPA regulations. 1021.104 Definitions. 1021.105 Oversight of Agency NEPA activities. Subpart B -- DOE Decisionmaking 1021.200 DOE planning. 1021.210 DOE decisionmaking. 1021.211 Interim actions: Limitations on actions during the NEPA process. 1021.212 Research, development, demonstration, and testing. 1021.213 Rulemaking.

  18. Geothermal probabilistic cost study

    SciTech Connect (OSTI)

    Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

    1981-08-01

    A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

  19. substantially reduced production costs

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    production costs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  20. Reducing Power Factor Cost

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low power factor is expensive and inefficient. Many utility companies charge you an additional fee if your power factor is less than 0.95. Low power factor also reduces your electrical system's distribu- tion capacity by increasing current flow and causing voltage drops. This fact sheet describes power factor and explains how you can improve your power factor to reduce electric bills and enhance your electrical system's capacity. REDUCING POWER FACTOR COST To understand power factor, visualize a

  1. Levelized Power Generation Cost Codes

    Energy Science and Technology Software Center (OSTI)

    1996-04-30

    LPGC is a set of nine microcomputer programs for estimating power generation costs for large steam-electric power plants. These programs permit rapid evaluation using various sets of economic and technical ground rules. The levelized power generation costs calculated may be used to compare the relative economics of nuclear and coal-fired plants based on life-cycle costs. Cost calculations include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generationmore » cost. These programs can be used for quick analyses of power generation costs using alternative economic parameters, such as interest rate, escalation rate, inflation rate, plant lead times, capacity factor, fuel prices, etc. The two major types of electric generating plants considered are pressurized water reactor (PWR) and pulverized coal-fired plants. Data are also provided for the Large Scale Prototype Breeder (LSPB) type liquid metal reactor.« less

  2. Shifting the cost curve for subsea developments

    SciTech Connect (OSTI)

    Solheim, B.J.; Hestad, E.

    1995-12-31

    A steadily increasing challenge in offshore oil and gas field developments in the Norwegian part of the North Sea is to design, construct, and install offshore installations that give an acceptable return of investment Deeper water, limited reservoirs and a low, fluctuating oil price make the task even more demanding. Saga Petroleum has recently faced this challenge with its last field development project. Attention in this paper is focused on the Vigdis subsea production system. However, the considerations and cost reduction elements are valid for offshore field developments in general. The main cost reductions are obtained by: Maximum use of industry capability; Application of new organization principles; Focus on functional requirements; Shortened project execution time; Technological development. In addition this paper presents thoughts on further cost reduction possibilities for future subsea field developments.

  3. Optical limiting materials

    DOE Patents [OSTI]

    McBranch, Duncan W. (Santa Fe, NM); Mattes, Benjamin R. (Santa Fe, NM); Koskelo, Aaron C. (Los Alamos, NM); Heeger, Alan J. (Santa Barbara, CA); Robinson, Jeanne M. (Los Alamos, NM); Smilowitz, Laura B. (Los Alamos, NM); Klimov, Victor I. (Los Alamos, NM); Cha, Myoungsik (Goleta, CA); Sariciftci, N. Serdar (Santa Barbara, CA); Hummelen, Jan C. (Groningen, NL)

    1998-01-01

    Optical limiting materials. Methanofullerenes, fulleroids and/or other fullerenes chemically altered for enhanced solubility, in liquid solution, and in solid blends with transparent glass (SiO.sub.2) gels or polymers, or semiconducting (conjugated) polymers, are shown to be useful as optical limiters (optical surge protectors). The nonlinear absorption is tunable such that the energy transmitted through such blends saturates at high input energy per pulse over a wide range of wavelengths from 400-1100 nm by selecting the host material for its absorption wavelength and ability to transfer the absorbed energy into the optical limiting composition dissolved therein. This phenomenon should be generalizable to other compositions than substituted fullerenes.

  4. Climate Policies | Open Energy Information

    Open Energy Info (EERE)

    Climate Policies Jump to: navigation, search This article is a stub. You can help OpenEI by expanding it. Retrieved from "http:en.openei.orgwindex.php?titleClimatePolicies&ol...

  5. Policy Flashes for 2009 & 2010

    Broader source: Energy.gov [DOE]

    The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe...

  6. Departmental Cyber Security Management Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-05-08

    The Departmental Cyber Security Management (DCSM) Policy was developed to further clarify and support the elements of the Integrated Safeguards and Security Management (ISSM) Policy regarding cyber security. Certified 9-23-10. No cancellation.

  7. Policy Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 13, 2015 POLICY FLASH 2015-26 Fiscal Year 2015 Small Business Contracting Goals. May 12, 2015 POLICY FLASH 2015-25 - AL 2015-05 Acquisition Letters Remaining in Effect. May 11,...

  8. Policy Flash 2014-34

    Broader source: Energy.gov [DOE]

    Questions concerning this policy flash should be directed to A. Scott Geary, of the  Office of Acquisition and Project Management Policy at 202-287-1507 or at andrew.geary@hq.doe.gov.

  9. DATE: TO: FROM: POLICY FLASH

    Office of Environmental Management (EM)

    70.15 provides: (1) a synopsis of the M&O contractor fee policy (focused on the mechanics of the calculation and the key considerations of the policy); (2) guidance on a key...

  10. Workplace Charging Challenge: Sample Workplace Charging Policy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Workplace Charging Policy Workplace Charging Challenge: Sample Workplace Charging Policy Review the policy guidelines used by one Workplace Charging Challenge partner to keep their...

  11. TO: Procurement Directors FROM: Director, Policy Division

    Energy Savers [EERE]

    POLICY FLASH 2011-56 DATE: March 16, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance...

  12. Federal Utility Partnership Working Group Purpose, Policies,...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purpose, Policies, and Operations Federal Utility Partnership Working Group Purpose, Policies, and Operations Draft document (last updated in 2010) discusses the purpose, policies,...

  13. Other Policy | Open Energy Information

    Open Energy Info (EERE)

    Incentive Type Place Applicable Sector Eligible Technologies Active Alternative Energy Portfolio Standard (Massachusetts) Other Policy Massachusetts Investor-Owned Utility...

  14. Fermilab | Director's Policy Manual | Home

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Financial Management Freedom of Information Act Requests Inclement Weather and Snow Policy Interactions with Legislators Issues Management Maintenance MOUs Between...

  15. Policy Flash 2013-03

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    POLICY FLASH 2013-03 DATE: October 11, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Responding to solicitations under DOE's Work for Others Program (WFO) SUMMARY: Under the WFO program, DOE provides access to and use of its contractor and facility resources to non-DOE sources. DOE has developed policies and procedures to ensure compliance with applicable laws, regulations and

  16. Policy Development | Department of Energy

    Energy Savers [EERE]

    Policy Development Policy Development Policy Development Project Management Policy and Systems (PM-30) is working to update all Project Management related orders, guides, handbooks, and standard operating procedures that the Office of Project Management Oversight and Assessments (PM) has published. The primary focus of the updates are to insure that the orders and guides, handbooks and SOPs reflect the latest guidance that the Secretary of the Energy has outlined in his memorandum dated December

  17. EPA Redesigns Conversion Certification Policies

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    EPA Redesigns Conversion Certification Policies At a recent meeting held in Washington, DC, officials from the U.S. Environmental Protection Agency (EPA) opened dialogue about proposed changes to its emission certification policies that affect alternative fuel vehicles (AFVs). "We are trying to accommo- date the Energy Policy Act (EPAct) and Executive Order requirements while trying to change enforce- ment policies and guidance with respect to conversions," said Rich Ackerman of EPA's

  18. Understanding and Informing the Policy Environment: State-Level Renewable Fuels Standards

    SciTech Connect (OSTI)

    Brown, E.; Cory, K.; Arent, D.

    2007-01-01

    Renewable fuels standard (RFS) policies are becoming a popular public policy mechanism for developing the market for renewable fuels in the transportation sector. During the past decade, U.S. states and several countries began implementing these more market-based (less command and control) policies to support increased biofuels production and use. This paper presents an overview of current and proposed U.S. state-level policies, as well as selected electric sector policies and international fuel standard policies. Current U.S. state-level renewable fuel policies list drivers including an improved economy and environment, as well as fuel self-sufficiency. Best practices and experience from an evaluation of renewable portfolio standards (RPS) in the United States and international RFS policies can inform U.S. state-level policy by illustrating the importance of policy flexibility, binding targets, effective cost caps, and tradable permits. Understanding and building on the experiences from these previous policies can improve the policy mechanism and further develop a market for renewable fuels to meet the goals of improved economy, environment, and fuel self-sufficiency.

  19. Travel Policy and Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-02-17

    The Order supplements the Federal Travel Regulation as principal source of policy for Federal employee travel and relocation and establishes DOE M 552.1-1A, U.S. Department of Energy Travel Manual, dated 2-17-06, as the DOE repository for supplementary travel requirements information. Cancels DOE O 552.1-1. Canceled by DOE O 552.1A Admin Chg 1.

  20. Solar Policy Environment: Seattle

    Broader source: Energy.gov [DOE]

    The objective of the Emerald City Solar Initiative is to overcome the barriers to widespread deployment of solar energy technology, dramatically increasing residential, commercial, City-owned, and community-scale solar energy use. The City has assembled a strong team of partners that have proven track records in the fields of public planning, renewable energy resource mapping, financial analysis, site analysis, education and outreach, policy analysis and advocacy, community organizing and renewable energy project development.

  1. Travel Policy and Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-09-04

    To supplement the Federal Travel Regulation (41 CFR, Parts 300-304), the principal source of policy for Federal employee travel and relocation matters, and to establish DOE M 552.1-1, U.S. Department of Energy Travel Manual, dated 09-04-02, as the repository for supplementary travel requirements information for the Department of Energy (DOE). Cancels DOE 1500.2A and DOE 1500.4A. Canceled by DOE O 552.1A.

  2. Travel Policy and Procedures

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-02-17

    The Order supplements the Federal Travel Regulation as principal source of policy for Federal employee travel and relocation and establishes DOE M 552.1-1A, U.S. Department of Energy Travel Manual, dated 2-17-06, as the repository for supplementary travel requirements information. Supersedes DOE O 552.1. Admin Chg 1, dated 10-1-08, supersedes DOE O 552.1A.

  3. Conflict of Interest Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Conflict of Interest Policy Conflict of Interest between the NIF Technical Review Committee Member and review of proposal All Conflicts of Interest between a reviewer and the proposals being reviewed should be reported to the Committee Chair and the NIF User Office Director prior to accepting lead reviewer assignments. Conflicts include being formally listed on the proposal, having supervision responsibility for the PI, or in any way receiving significant benefit from the awarding of the

  4. WIPP Privacy Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WIPP Privacy Policy and Disclaimers NOTICE: The Waste Isolation Pilot Plant (WIPP) Internet Server is provided as a service of the Department of Energy (DOE) for distribution of publicly available information and is maintained by the WIPP for the National Transuranic Waste Program. The WIPP is an agency of the Federal Government of the United States of America. Use of the WIPP Internet Server is intended only for the retrieval of information available through WIPP Internet documents. Only

  5. NNSA POLICY LETTER

    National Nuclear Security Administration (NNSA)

    POLICY LETTER Approved: 12-11-13 QUALITY MANAGEMENT SYSTEM NATIONAL NUCLEAR SECURITY ADMINISTRATION Office of the Administrator NAP-26 CONTROLLED COPIES AVAILABLE AT: INITIATED BY: http://www.nnsa.energy.gov Office of Quality Management THIS PAGE INTENTIONALLY LEFT BLANK NAP-26 1 12-11-13 QUALITY MANAGEMENT SYSTEM 1. PURPOSE. Establish, implement, maintain, assess, and improve the Quality Management System (QMS) for NNSA Federal operations in compliance with the International Organization for

  6. OPAM Policy Acquisition Guides

    Energy Savers [EERE]

    --Chapter 23.0 (June 2007) 1 Executive Order 13423 - Strengthening Federal Environmental, Energy, and Transportation Management in Acquisition Reference: FAR 23, 52.223, OFPP Policy Letter 07-01, DEAR 923, 952.223, 970.23, and 970.5223 Overview Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, replaces the Greening the Government series of 4 Executive Orders intended to improve the Federal impact on environment, energy and transportation

  7. Low-Cost Spectral Sensor Development Description.

    SciTech Connect (OSTI)

    Armijo, Kenneth Miguel; Yellowhair, Julius

    2014-11-01

    Solar spectral data for all parts of the US is limited due in part to the high cost of commercial spectrometers. Solar spectral information is necessary for accurate photovoltaic (PV) performance forecasting, especially for large utility-scale PV installations. A low-cost solar spectral sensor would address the obstacles and needs. In this report, a novel low-cost, discrete- band sensor device, comprised of five narrow-band sensors, is described. The hardware is comprised of commercial-off-the-shelf components to keep the cost low. Data processing algorithms were developed and are being refined for robustness. PV module short-circuit current ( I sc ) prediction methods were developed based on interaction-terms regression methodology and spectrum reconstruction methodology for computing I sc . The results suggest the computed spectrum using the reconstruction method agreed well with the measured spectrum from the wide-band spectrometer (RMS error of 38.2 W/m 2 -nm). Further analysis of computed I sc found a close correspondence of 0.05 A RMS error. The goal is for ubiquitous adoption of the low-cost spectral sensor in solar PV and other applications such as weather forecasting.

  8. Levelized cost and levelized avoided cost of new generation resources...

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    3 The importance of the factors varies among the technologies. For technologies such as solar and wind generation that have no fuel costs and relatively small variable O&M costs,...

  9. LIFE Cost of Electricity, Capital and Operating Costs

    SciTech Connect (OSTI)

    Anklam, T

    2011-04-14

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  10. Queues and Scheduling Policies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cores Max Wallclock QOS1) Run Limit Submit Limit Relative Priority Charge Factor2) debug 1-512 1-12,288 30 mins - 1 10 2 2 regular 1-682 1-16,368 36 hrs normal 24 100 4 2...

  11. Policy and Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Regulations Policy and Regulations map-1019833_960_720.jpg

  12. Dynamic Line Rating: Research and Policy Evaluation

    SciTech Connect (OSTI)

    Jake P. Gentle; Kurt S. Myers; Michael R. West

    2014-07-01

    Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of electrical conductors to be increased based on local weather conditions. Overhead lines are conventionally given a conservative rating based on worst case scenarios. We demonstrate that observing the conditions in real time leads to additional capacity and safer operation. This paper provides a report of a pioneering scheme in the United States of America in which DLR has been applied. Thereby, we demonstrate that observing the local weather conditions in real time leads to additional capacity and safer operation. Secondly, we discuss limitations involved. In doing so, we arrive at novel insights which will inform and improve future DLR projects. Third, we provide a policy background and discussion to clarify the technology’s potential and identifies barriers to the imminent adoption of dynamic line rating systems. We provide suggestions for regulatory bodies about possible improvements in policy to encourage adoption of this beneficial technology.

  13. Examining the effectiveness of municipal solid waste management systems: An integrated cost-benefit analysis perspective with a financial cost modeling in Taiwan

    SciTech Connect (OSTI)

    Weng, Yu-Chi; Fujiwara, Takeshi

    2011-06-15

    In order to develop a sound material-cycle society, cost-effective municipal solid waste (MSW) management systems are required for the municipalities in the context of the integrated accounting system for MSW management. Firstly, this paper attempts to establish an integrated cost-benefit analysis (CBA) framework for evaluating the effectiveness of MSW management systems. In this paper, detailed cost/benefit items due to waste problems are particularly clarified. The stakeholders of MSW management systems, including the decision-makers of the municipalities and the citizens, are expected to reconsider the waste problems in depth and thus take wise actions with the aid of the proposed CBA framework. Secondly, focusing on the financial cost, this study develops a generalized methodology to evaluate the financial cost-effectiveness of MSW management systems, simultaneously considering the treatment technological levels and policy effects. The impacts of the influencing factors on the annual total and average financial MSW operation and maintenance (O and M) costs are analyzed in the Taiwanese case study with a demonstrative short-term future projection of the financial costs under scenario analysis. The established methodology would contribute to the evaluation of the current policy measures and to the modification of the policy design for the municipalities.

  14. Optical limiting materials

    DOE Patents [OSTI]

    McBranch, D.W.; Mattes, B.R.; Koskelo, A.C.; Heeger, A.J.; Robinson, J.M.; Smilowitz, L.B.; Klimov, V.I.; Cha, M.; Sariciftci, N.S.; Hummelen, J.C.

    1998-04-21

    Methanofullerenes, fulleroids and/or other fullerenes chemically altered for enhanced solubility, in liquid solution, and in solid blends with transparent glass (SiO{sub 2}) gels or polymers, or semiconducting (conjugated) polymers, are shown to be useful as optical limiters (optical surge protectors). The nonlinear absorption is tunable such that the energy transmitted through such blends saturates at high input energy per pulse over a wide range of wavelengths from 400--1,100 nm by selecting the host material for its absorption wavelength and ability to transfer the absorbed energy into the optical limiting composition dissolved therein. This phenomenon should be generalizable to other compositions than substituted fullerenes. 5 figs.

  15. Security Clearances; Limitations

    Energy Savers [EERE]

    SEC. 1072. SECURITY CLEARANCES; LIMITATIONS. (a) In General.-Title III of the Intelligence Reform and Terrorism Prevention Act of 2004 (50 U.S.C. 435b) is amended by adding at the end the following new section: "SEC. 3002. SECURITY CLEARANCES; LIMITATIONS. "(a) Definitions.-In this section: "(1) Controlled substance.-The term `controlled substance' has the meaning given that term in section 102 of the Controlled Substances Act (21 U.S.C. 802). "(2) Covered person.-The term

  16. Internal Audit Policy | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Internal Audit Policy Version Number: 2 Document Number: Policy 10300.001 Effective Date: 01/2014

  17. Cost | OpenEI Community

    Open Energy Info (EERE)

    Cost Home Ocop's picture Submitted by Ocop(5) Member 15 July, 2014 - 07:07 MHK LCOE Reporting Guidance Draft Cost Current DOE LCOE numerical modeling Performance Tidal Wave To...

  18. Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts | Department of Energy 7 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management

  19. Wind Integration Cost and Cost-Causation: Preprint

    SciTech Connect (OSTI)

    Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

    2013-10-01

    The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

  20. Cost and Quality of Fuels for Electric Utility Plants 1997

    Gasoline and Diesel Fuel Update (EIA)

    7 Tables May 1998 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of the Department of Energy or any other organization. Energy Information Administration/Cost

  1. Check Estimates and Independent Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  2. Hydropower Baseline Cost Modeling

    SciTech Connect (OSTI)

    O'Connor, Patrick W.; Zhang, Qin Fen; DeNeale, Scott T.; Chalise, Dol Raj; Centurion, Emma E.

    2015-01-01

    Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.

  3. Solar Deployment and Policy

    Gasoline and Diesel Fuel Update (EIA)

    Solar Deployment and Policy Justin Baca Director of Research Solar Energy Industries Association About SEIA * Founded in 1974 * U.S. National Trade Association for Solar Energy * 1,000 member companies from around the world * Members from across 50 states * Largest companies in the world as well as small installers * Our Mission: Build a strong solar industry to power America * Our Goal: 10 gigawatts (GW) of annual installed solar capacity in the U.S. by 2015 July 18, 2014 © 2014 Solar Energy

  4. Tribal Utility Policy Issues

    Energy Savers [EERE]

    Utility Policy Issues New Mexico July 27, 2015 Margaret Schaff Kanim Associates, LLC (An Indian Owned Consulting Firm) 303-443-0182 mschaff@att.net *US Energy Information Administration New Mexico Energy Stats  Sixth in crude oil production in the nation in 2013.  5% of U.S. marketed natural gas production in 2012  Largest coal-fired electric power plants in NM both on Navajo Nation  2,100-megawatt Four Corners (Navajo Mine) (APS)  1,643-megawatt San Juan (San Juan Mines) (Public

  5. NNSA POLICY LETTER

    National Nuclear Security Administration (NNSA)

    Approved: 12-13-12 Admin Change 1: 2-9-15 ATOMIC ENERGY ACT CONTROL OF IMPORT AND EXPORT ACTIVITIES NATIONAL NUCLEAR SECURITY ADMINISTRATION Office of Defense Programs NAP-23 CONTROLLED DOCUMENT OFFICE OF PRIMARY INTEREST (OPI): AVAILABLE ON-LINE AT: Office of Defense Programs http://nnsa.energy.gov printed copies are uncontrolled THIS PAGE INTENTIONALLY LEFT BLANK NAP-23 1 12-13-12 ATOMIC ENERGY ACT CONTROL OF IMPORT AND EXPORT ACTIVITIES 1. PURPOSE. To establish NNSA policy and procedures for

  6. OPAM Policy Acquisition Guides

    Energy Savers [EERE]

    Chapter 17.3 (February 2004) Acquisition, Use, and Disposal of Real Estate [Reference: DEAR 917.74, 970.5244-1] Overview This section provides internal Departmental information and a DOE point of contact for issues dealing with real estate acquisition, use, and disposal. Background DEAR 917.74 provides the policy and procedures to be followed in the acquisition, use, and disposal of real estate. In accordance with DEAR clause 970.5244-1, Management and Operating contractors also follow the DEAR

  7. INCITE Quarterly Report Policy | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Cooley Policies Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job Scheduling Policy on BG/Q Job Scheduling Policies on Cooley Pullback Policy Refund Policy Software Policy User Authentication Policy Documentation Feedback Please provide feedback to help guide us as we continue to build documentation for our new computing resource. [Feedback Form] INCITE Quarterly Report Policy

  8. Policy Overview and Options for Maximizing the Role of Policy...

    Office of Scientific and Technical Information (OSTI)

    (EE-4G) (Geothermal Technologies Office Corporate) Country of Publication: United States Language: English Subject: gtp; policy; electricity Word Cloud More Like This Full Text ...

  9. Policy Overview and Options for Maximizing the Role of Policy...

    Office of Scientific and Technical Information (OSTI)

    drive the market to optimize development of available geothermal electricity resources. ... Country of Publication: United States Language: English Subject: gtp; policy; ...

  10. The Costs and Benefits of Compliance with Renewable Portfolio Standards: Reviewing Experience to Date

    SciTech Connect (OSTI)

    Heeter, Jenny; Barbose, Galen; Bird, Lori; Weaver, Samantha; Flores, Francisco; Kuskova-Burns, Ksenia; Wiser, Ryan

    2014-03-12

    More than half of U.S. states have renewable portfolio standards (RPS) in place and have collectively deployed approximately 46,000 MW of new renewable energy capacity through year-end 2012. Most of these policies have five or more years of implementation experience, enabling an assessment of their costs and benefits. Understanding RPS benefits and costs is essential for policymakers evaluating existing RPS policies, assessing the need for modifications, and considering new policies. A key aspect of this study is the comprehensive review of existing RPS cost and benefit estimates, in addition to an examination of the variety of methods used to calculate such estimates. Based on available data and estimates reported by utilities and regulators, this study summarizes RPS costs to date. The study considers how those costs may evolve going forward, given scheduled increases in RPS targets and cost containment mechanisms incorporated into existing policies. The report also summarizes RPS benefits estimates, based on published studies for individual states, and discusses key methodological considerations.

  11. Realistic costs of carbon capture

    SciTech Connect (OSTI)

    Al Juaied, Mohammed . Belfer Center for Science and International Affiaris); Whitmore, Adam )

    2009-07-01

    There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

  12. Heat flux limiting sleeves

    DOE Patents [OSTI]

    Harris, William G. (Tampa, FL)

    1985-01-01

    A heat limiting tubular sleeve extending over only a portion of a tube having a generally uniform outside diameter, the sleeve being open on both ends, having one end thereof larger in diameter than the other end thereof and having a wall thickness which decreases in the same direction as the diameter of the sleeve decreases so that the heat transfer through the sleeve and tube is less adjacent the large diameter end of the sleeve than adjacent the other end thereof.

  13. Fault Current Limiters

    Office of Environmental Management (EM)

    Fault Current Limiters Superconducting & Solid-state Power Equipment Office of Electricity Delivery and Energy Reliability www.oe.energy.gov Office of Electricity Delivery and Energy Reliability, OE-1 U.S. Department of Energy - 1000 Independence Avenue, SW - Washington, DC 20585 Plugging America Into the Future of Power What are FCLs? A fault is an unintentional short circuit, or partial short-circuit, in an electric circuit. A variety of factors such as lightning, downed power lines, or

  14. Panel 4, Hydrogen Energy Storage Policy Considerations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Storage Policy Considerations Hydrogen Storage Workshop Jeffrey Reed Southern California Gas Company May 15, 2014 0 Methane is a Great Storage Medium 1 SoCalGas' storage fields are the largest energy storage resource in the region Goleta Playa Del Rey Honor Rancho Aliso Canyon 2 And There's a Fully Built Delivery System N S E W LINE 235 LINE 335 LEGEND NOT TO SCALE RECIPROCATING COMPRESSOR STATION CENTRIFUGAL COMPRESSOR STATION PRESSURE LIMITING STATION STORAGE FIELD 4/00 P AC IF IC GA S

  15. NEPA Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy NEPA Policy Selected documents on the topic of NEPA policy. September 7, 2012 OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution This Office of Management and Budget (OMB) and Council on Environmental Quality (CEQ) joint memorandum expands and builds on the November 28, 2005, Environmental Conflict Resolution (ECR) Memorandum, directing departments and agencies to increase the appropriate and effective use of third-party assisted environmental

  16. Policy Flash 2012-53

    Broader source: Energy.gov (indexed) [DOE]

    Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Accelerating Payment to Small Business Subcontractors SUMMARY: OMB...

  17. Policy Memoranda | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    an employee's Fair Labor Standards Act status within the Department. March 31, 2010 POLICY GUIDANCE MEMORANDUM 07 Current Appropriations Law and Compensation of Foreign...

  18. Policy Flash 2012-64

    Broader source: Energy.gov (indexed) [DOE]

    Office of Policy Office of Acquisition and Project Management SUBJECT: Contract Clause Matrix SUMMARY: Attached for your information is a corrected Department of Energy Acquisition...

  19. Policy Flash 2005-53

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policy provides the updated Acquisition Guide Chapter 71.1 Headquarters Business Clearance Review Process (Dec 2014). Update revises several areas of the review and approval...

  20. Project Management Policies & Principles Memo

    Broader source: Energy.gov [DOE]

    Memo enhances and clarifies departmental policy related to project management as a result of the Improving Project Management Study and subsequent Secretarial Memo dated December 2014.

  1. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    and Assistance Management SUBJECT: Delay of Rollout of the System for Award Management (SAM) by the General Services Administration (GSA) SUMMARY: Policy Flash 2012-45 provided...

  2. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    office-managementoperational- managementprocurement-and-acquisitionpolicy-flashes. Questions concerning this policy flash should be directed to Jason Taylor of the Office...

  3. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    office-managementoperational- managementprocurement-and-acquisitionpolicy-flashes. Questions concerning this policy flash should be directed to Jason Taylor at (202)...

  4. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    14, 2011 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Acquisition Guide...

  5. Policy Flashes | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 17, 2014 Policy Flash 2015-01 Revision to the Federal Assistance Reporting Checklist, DOE F 4600.2 (102014)...

  6. Policy Flash Archive Search Listing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Department of Energy's Policy on Reporting Jobs Created Under the Recovery Act ... Flash2010-02 Attachment 1-Memorandum from Steve Isakowitz, dated June 10, 2009, Concerning ...

  7. Fermilab Today - Classified Ad Policy

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fermilab Classified Ad Policy Fermilab Today now requires that people placing classified ads must belong to one of these categories: a. active and retired employees of Fermi...

  8. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2008-03-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  9. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

    2007-04-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

  10. Advanced Fuel Cycle Cost Basis

    SciTech Connect (OSTI)

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2009-12-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  11. Account Sponsorship & Retention Policy | Argonne Leadership Computing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Facility Allocations Mira/Cetus/Vesta Cooley Policies Accounts Policy Account Sponsorship & Retention Policy ALCC Quarterly Report Policy ALCF Acknowledgment Policy Data Policy INCITE Quarterly Report Policy Job Scheduling Policy on BG/Q Job Scheduling Policies on Cooley Pullback Policy Refund Policy Software Policy User Authentication Policy Documentation Feedback Please provide feedback to help guide us as we continue to build documentation for our new computing resource. [Feedback

  12. Policy Flash 2013-69 Extension of Policy to Provide accelerated...

    Energy Savers [EERE]

    69 Extension of Policy to Provide accelerated payment to small business subcontractors Policy Flash 2013-69 Extension of Policy to Provide accelerated payment to small business...

  13. Fault current limiter

    DOE Patents [OSTI]

    Darmann, Francis Anthony

    2013-10-08

    A fault current limiter (FCL) includes a series of high permeability posts for collectively define a core for the FCL. A DC coil, for the purposes of saturating a portion of the high permeability posts, surrounds the complete structure outside of an enclosure in the form of a vessel. The vessel contains a dielectric insulation medium. AC coils, for transporting AC current, are wound on insulating formers and electrically interconnected to each other in a manner such that the senses of the magnetic field produced by each AC coil in the corresponding high permeability core are opposing. There are insulation barriers between phases to improve dielectric withstand properties of the dielectric medium.

  14. High-Quality, Low-Cost Bulk Gallium Nitride Substrates

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    High-Quality, Low- Cost Bulk Gallium Nitride Substrates Electrochemical Solution Growth: A Scalable Semiconductor Manufacturing Process The ever-growing demand in the past decade for more energy effcient solid-state lighting and electrical power conversion is leading to a higher demand for wide bandgap semiconductor-based devices, such as gallium nitride (GaN), over traditional silicon (Si)-based devices. High cost and limited availability, how- ever, have hindered the adoption of GaN substrates

  15. Incremental cost pricing of transmission services. Final report

    SciTech Connect (OSTI)

    Not Available

    1994-12-01

    This report, prepared by ICF Resources, under a sub-contract with IT Corporation, is concerned chiefly with examining the economic concepts underlying an Incremental Cost Pricing Framework (ICPF), which is defined here as a pricing regime that takes into account several factors: economic efficiency in terms of sending the correct long-term price signals to both users and owners of transmission assets; pricing of individual services in relationship to cost causation; full recovery of costs associated with transmission service; and applicability to real-world power systems without extraordinary administrative burdens. In the course of this examination, the report makes assumptions, as necessary, and assesses the extent to which they may or may not comport with real-world conditions. It also assesses the pros and cons of different approaches to pricing various components of transmission service without making a recommendation as to the superiority of one approach over another from a public policy perspective.

  16. Policies for green design

    SciTech Connect (OSTI)

    Fullerton, D.; Wu, W.

    1998-09-01

    A simple general equilibrium model is used to analyze disposal-content fees, subsidies for recyclable designs, unit-pricing of household disposal, deposit-refund systems, and manufacturer take-back requirements. Firms use primary and recycled inputs to produce output that has two attributes: packaging per unit output, and recyclability. If households pay the social cost of disposal, then they send the right signals to producers to reduce packaging and to design products that can more easily be recycled. If garbage is collected for free, then socially optimum attributes can still be achieved by a tax on producers` use of packaging and subsidy to recyclable designs.

  17. Soft Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Soft Costs Soft Costs The U.S. Department of Energy (DOE) SunShot Initiative accelerates the adoption of solar energy technologies in the marketplace. In support of SunShot Initiative goals, the solar office partners with manufacturers, communities, universities, utilities, and other stakeholders to: Reduce non-hardware costs Lower barriers Foster growth. These focus areas ensure that solar energy systems continue to become more affordable and accessible for Americans. Current Efforts DOE issues

  18. Solar Policy Environment: Knoxville

    Broader source: Energy.gov [DOE]

    The City of Knoxville is “beginning at the beginning” of the transition to solar energy utilization. With limited public information and experience, it is important for Knoxville to focus extensively on public outreach and workforce development. The City will also commence a direct incentive and embark on a massive educational program.

  19. HTGR Cost Model Users' Manual

    SciTech Connect (OSTI)

    A.M. Gandrik

    2012-01-01

    The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

  20. Expanding the Pool of Federal Policy Options to Promote Industrial Energy Efficiency

    SciTech Connect (OSTI)

    Brown, Dr. Marilyn Ann; Cox, Matthew; Jackson, Roderick K; Lapsa, Melissa Voss

    2011-01-01

    Improving the energy efficiency of industry is essential for maintaining the viability of domestic manufacturing, especially in a world economy where production is shifting to low-cost, less regulated developing countries. Numerous studies have shown the potential for significant cost-effective energy-savings in U.S. industries, but the realization of this potential is hindered by regulatory, information, workforce, and financial obstacles. This report evaluates seven federal policy options aimed at improving the energy efficiency of industry, grounded in an understanding of industrial decision-making and the barriers to efficiency improvements. Detailed analysis employs the Georgia Institute of Technology's version of the National Energy Modeling System and spreadsheet calculations, generating a series of benefit/cost metrics spanning private and public costs and energy bill savings, as well as air pollution benefits and the social cost of carbon. Two of the policies would address regulatory hurdles (Output-Based Emissions Standards and a federal Energy Portfolio Standard with Combined Heat and Power); three would help to fill information gaps and workforce training needs (the Superior Energy Performance program, Implementation Support Services, and a Small Firm Energy Management program); and two would tackle financial barriers (Tax Lien Financing and Energy-Efficient Industrial Motor Rebates). The social benefit-cost ratios of these policies appear to be highly favorable based on a range of plausible assumptions. Each of the seven policy options has an appropriate federal role, broad applicability across industries, utilizes readily available technologies, and all are administratively feasible.

  1. Project Cost Profile Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet File Project Cost Profile Spreadsheet.xlsx More Documents & Publications Statement of Work (SOW) Template ...

  2. Multi-Year Analysis Examines Costs, Benefits, and Impacts of Renewable Portfolio Standards

    SciTech Connect (OSTI)

    2016-01-01

    As states consider revising renewable portfolio standard (RPS) programs or developing new ones, careful assessments of the costs, benefits, and other impacts of existing policies will be critical. RPS programs currently exist in 29 states and Washington, D.C. Many of these policies, which were enacted largely during the late 1990s and 2000s, will reach their terminal targets by the end of this decade. The National Renewable Energy Laboratory (NREL) and Lawrence Berkeley National Laboratory (LBNL) are engaged in a multi-year project to examine the costs, benefits, and other impacts of state RPS polices both retrospectively and prospectively. This fact sheet overviews this work.

  3. OPAM Policy Acquisition Guides | Department of Energy

    Energy Savers [EERE]

    7 - Special Contracting Methods Subject: Cost and Price Analysis Subject: Cost and Price Analysis

  4. Solar Power. Policy Overview and Good Practices

    SciTech Connect (OSTI)

    Cox, Sadie; Walters, Terri; Esterly, Sean; Booth, Sarah

    2015-05-01

    As global electricity demand increases, governments are designing and implementing policies to scale up and catalyze renewable energy, which now meets 22% of global electricity demand (REN21 2014). Solar technologies are a critical component of this expanded deployment, and they have experienced unprecedented growth in recent years. As presented in Figure 1, solar prices have decreased significantly over the last decade (REN21 2014) and in 2013, new capacity installation of solar electricity from photovoltaics (PV) 1 surpassed all other renewable energy technologies worldwide—excluding hydropower—with 39 gigawatts installed that year. Concentrating solar thermal power,2 although it still represents a fairly nascent market, also continues to expand as installed capacity increased by 36% in 2013 compared to 2012. In addition to meeting energy demand in an increasingly cost-effective manner, solar deployment can also support critical economic, social, and environmental development goals (Flavin and Hull Aeck, n.d.).

  5. Personal Property Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Personal Property Policy Personal Property Policy Personal Property Policy The DOE Personal Property Policy Division is responsible for development and oversight of the Department's personal property management program; establishes policies, standards, and guidance in accordance with applicable laws, regulations and sound personal property management practices and standards. Additionally MA-653: Advises and provides staff assistance to headquarters and field organizations that perform personal

  6. Timminco Limited | Open Energy Information

    Open Energy Info (EERE)

    Limited Jump to: navigation, search Name: Timminco Limited Place: Toronto, Ontario, Canada Zip: M5H 1J9 Product: Canadian manufacturer of magnesium and silicon; operates its...

  7. Renewable Energy Cost Optimization Spreadsheet

    Energy Science and Technology Software Center (OSTI)

    2007-12-31

    The Software allow users to determine the optimum combination of renewable energy technologies to minimize life cycle cost for a facility by employing various algorithms which calculate initial and operating cost, energy delivery, and other attributes associated with each technology as a function of size.

  8. Replacement Cost of Domestic Crude

    Energy Science and Technology Software Center (OSTI)

    1994-12-01

    The DEEPWATER model forecasts the replacement cost of domestic crude oil for 13 offshore regions in the lower 48 states. The replacement cost of domestic crude oil is the constant or levelized selling price that will recover the full expense of exploration, development, and productions with a reasonable return on capital.

  9. SciTech Connect: Website Policies / Important Links

    Office of Scientific and Technical Information (OSTI)

    Website Policies / Important Links Website Policies / Important Links Javascript Not Enabled OSTI Security Website Policies and Important Links

  10. Analyzing the Impacts of Policies and Technological Change Using HyTrans |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Analyzing the Impacts of Policies and Technological Change Using HyTrans Analyzing the Impacts of Policies and Technological Change Using HyTrans Presentation by ORNL's David Greene at the 2010 - 2025 Scenario Analysis for Hydrogen Fuel Cell Vehicles and Infrastructure Meeting on August 9 - 10, 2006 in Washington, D.C. PDF icon greene_scenarios_hytrans.pdf More Documents & Publications Integrated Market Modeling of Hydrogen Transition Scenarios with HyTrans Cost and

  11. Economic Environment 0 Anirban Basu, Chairman & CEO, Sage Policy Group,

    Office of Environmental Management (EM)

    Inc. | Department of Energy Economic Environment 0 Anirban Basu, Chairman & CEO, Sage Policy Group, Inc. Economic Environment 0 Anirban Basu, Chairman & CEO, Sage Policy Group, Inc. Topics Discussed: Real GDP Growth, 20 Fastest and Slowest Growing Countries Estimated Growth in Output by Select Global Areas Median Weekly Earnings, Full-Time U.S. Workers Construction Employment Cost Index Industrial Production Gross Domestic Product More... PDF icon Workshop 2015 - Basu_Economic

  12. Solar Policy Environment: Philadelphia

    Broader source: Energy.gov [DOE]

    The project will identify promising locations for photovoltaic installations and create a roadmap for commercial and residential system developers. The roadmap, published as the Solar Developers Guide to Philadelphia, will be used to promote and attract solar energy investment. Philadelphia’s long-term goal for solar energy is to fully utilize the potential of solar energy to safely, reliably, and cost-effectively displace the use of energy generated by fossil fuels. To achieve its solar energy goals, the City of Philadelphia must add large commercial scale (> 500 kW) solar installations to its ongoing efforts on the smaller scale (we note that a new 1 MW PV installation will be installed at the Philadelphia Navy Yard by the end of 2008).

  13. WPN 08-4: Space Heater Policy

    Broader source: Energy.gov [DOE]

    To update the policy relation to space heaters for the low-income Weatherization Assistance Program. This policy supersedes the previous space heater policy issued by memoranda on March 18, 1992.

  14. City of San Diego- Sustainable Building Policy

    Broader source: Energy.gov [DOE]

    The City of San Diego’s Sustainable Building Policy is directed by Council Policy 900-14. The policy contains regulations regarding building measures, private-sector incentives, health and...

  15. Secretarial Policy Statement on Scientific Integrity

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-06-02

    This Secretarial policy statement is intended to enhance our culture by establishing a unified framework for scientific integrity. This policy applies to all DOE Federal employees. This policy will be reviewed annually. Does not cancel/supersede other directives.

  16. Low-to-No Cost Strategy for Energy Efficiency in Public Buildings |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Low-to-No Cost Strategy for Energy Efficiency in Public Buildings Low-to-No Cost Strategy for Energy Efficiency in Public Buildings This webinar covered how to make existing buildings more energy efficient. Transcript PDF icon Presentation More Documents & Publications Effective O&M Policy in Public Buildings Preparing for the Arrival of Electric Vehicle Quality Assurance for Residential Retrofit Programs

  17. Combined Heat and Power (CHP): Essential for a Cost Effective Clean Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Standard, April 2011 | Department of Energy : Essential for a Cost Effective Clean Energy Standard, April 2011 Combined Heat and Power (CHP): Essential for a Cost Effective Clean Energy Standard, April 2011 In March 2011, a federal Clean Energy Standard (CES) was put forth as an approach to advancing a new national energy policy. This white paper discusses the CES concept. PDF icon chp_clean_energy_std.pdf More Documents & Publications The International CHP/DHC Collaborative - Advancing

  18. Benchmarking and Disclosure: State and Local Policy Design Guide...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Benchmarking and Disclosure: State and Local Policy Design Guide and Sample Policy Language State and local policy design guide. Benchmarking and Disclosure: State and Local Policy ...

  19. Policy Flash 2015-18 | Department of Energy

    Energy Savers [EERE]

    8 Policy Flash 2015-18 More Documents & Publications Policy Flash 2015-19 Policy Flash 2016-08 POLICY FLASH 2015-33

  20. Policy_Statement_on_TT.pdf | Department of Energy

    Office of Environmental Management (EM)

    PolicyStatementonTT.pdf PolicyStatementonTT.pdf PolicyStatementonTT.pdf More Documents & Publications PolicyStatementonTechnologyTransfer.pdf Chapter 17 - Special...

  1. Policy Flash 2015-19 | Department of Energy

    Energy Savers [EERE]

    9 Policy Flash 2015-19 More Documents & Publications Policy Flash 2015-18 Policy Flash 2016-08 POLICY FLASH 2015-33

  2. Unreasonable Cost Waivers | Department of Energy

    Office of Environmental Management (EM)

    Unreasonable Cost Waivers Unreasonable Cost Waivers unreasonablecost10-03-2012.pdf cnmidecision.pdf eaglepassdecision.pdf...

  3. Low-Cost Microchannel Heat Exchanger

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... cooling application tests * Complete high pressure application integrity and performance tests * Define performance and cost advantages over conventional approach Cost ...

  4. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  5. MENTAL POLICY ACT IMPLE- MENTING PROCEDURES Subpart A-General

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    59 Department of Energy § 1021.102 PART 1021-NATIONAL ENVIRON- MENTAL POLICY ACT IMPLE- MENTING PROCEDURES Subpart A-General Sec. 1021.100 Purpose. 1021.101 Policy. 1021.102 Applicability. 1021.103 Adoption of CEQ NEPA regulations. 1021.104 Definitions. 1021.105 Oversight of Agency NEPA activi- ties. Subpart B-DOE Decisionmaking 1021.200 DOE planning. 1021.210 DOE decisionmaking. 1021.211 Interim actions: Limitations on ac- tions during the NEPA process. 1021.212 Research, development,

  6. Bioenergy and the importance of land use policy in a carbon-constrained world

    SciTech Connect (OSTI)

    Calvin, Katherine V.; Edmonds, James A.; Wise, Marshall A.

    2010-06-01

    Policies aimed at limiting anthropogenic climate change would result in significant transformations of the energy and land-use systems. However, increasing the demand for bioenergy could have a tremendous impact on land use, and can result in land clearing and deforestation. Wise et al. (2009a,b) analyzed an idealized policy to limit the indirect land use change emissions from bioenergy. The policy, while effective, would be difficult, if not impossible, to implement in the real world. In this paper, we consider several different land use policies that deviate from this first-best, using the Joint Global Change Research Institute’s Global Change Assessment Model (GCAM). Specifically, these new frameworks are (1) a policy that focuses on just the above-ground or vegetative terrestrial carbon rather than the total carbon, (2) policies that focus exclusively on incentivizing and protecting forestland, and (3) policies that apply an economic penalty on the use of biomass as a proxy to limit indirect land use change emissions. For each policy, we examine its impact on land use, land-use change emissions, atmospheric CO2 concentrations, agricultural supply, and food prices.

  7. NNSA Policies | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    About Us / Our Operations / Management and Budget / NNSA Policy System / NNSA Policies NNSA Policies NNSA Policies (NAPs) impart policy and requirements unique to the Administration or provide short-term notices until more formal direction can be provided. NAP-4B Corporate Performance Process for M&O Contractors June 30, 2008 NAP-6A Federal Employee Occupational Safety and Health Program May 13, 2014 NAP-7 NNSA's Acquisition and Assistance Policy Guidance December 9, 2002 NAP-14.1D Baseline

  8. Maintaining environmental quality while expanding biomass production: Sub-regional U.S. policy simulations

    SciTech Connect (OSTI)

    Egbendewe-Mondzozo, Aklesso; Swinton, S.; Izaurralde, Roberto C.; Manowitz, David H.; Zhang, Xuesong

    2013-03-01

    This paper evaluates environmental policy effects on ligno-cellulosic biomass production and environ- mental outcomes using an integrated bioeconomic optimization model. The environmental policy integrated climate (EPIC) model is used to simulate crop yields and environmental indicators in current and future potential bioenergy cropping systems based on weather, topographic and soil data. The crop yield and environmental outcome parameters from EPIC are combined with biomass transport costs and economic parameters in a representative farmer profit-maximizing mathematical optimization model. The model is used to predict the impact of alternative policies on biomass production and environmental outcomes. We find that without environmental policy, rising biomass prices initially trigger production of annual crop residues, resulting in increased greenhouse gas emissions, soil erosion, and nutrient losses to surface and ground water. At higher biomass prices, perennial bioenergy crops replace annual crop residues as biomass sources, resulting in lower environmental impacts. Simulations of three environmental policies namely a carbon price, a no-till area subsidy, and a fertilizer tax reveal that only the carbon price policy systematically mitigates environmental impacts. The fertilizer tax is ineffectual and too costly to farmers. The no-till subsidy is effective only at low biomass prices and is too costly to government.

  9. Processing Cost Analysis for Biomass Feedstocks

    SciTech Connect (OSTI)

    Badger, P.C.

    2002-11-20

    The receiving, handling, storing, and processing of woody biomass feedstocks is an overlooked component of biopower systems. The purpose of this study was twofold: (1) to identify and characterize all the receiving, handling, storing, and processing steps required to make woody biomass feedstocks suitable for use in direct combustion and gasification applications, including small modular biopower (SMB) systems, and (2) to estimate the capital and operating costs at each step. Since biopower applications can be varied, a number of conversion systems and feedstocks required evaluation. In addition to limiting this study to woody biomass feedstocks, the boundaries of this study were from the power plant gate to the feedstock entry point into the conversion device. Although some power plants are sited at a source of wood waste fuel, it was assumed for this study that all wood waste would be brought to the power plant site. This study was also confined to the following three feedstocks (1) forest residues, (2) industrial mill residues, and (3) urban wood residues. Additionally, the study was confined to grate, suspension, and fluidized bed direct combustion systems; gasification systems; and SMB conversion systems. Since scale can play an important role in types of equipment, operational requirements, and capital and operational costs, this study examined these factors for the following direct combustion and gasification system size ranges: 50, 20, 5, and 1 MWe. The scope of the study also included: Specific operational issues associated with specific feedstocks (e.g., bark and problems with bridging); Opportunities for reducing handling, storage, and processing costs; How environmental restrictions can affect handling and processing costs (e.g., noise, commingling of treated wood or non-wood materials, emissions, and runoff); and Feedstock quality issues and/or requirements (e.g., moisture, particle size, presence of non-wood materials). The study found that over the years the industry has shown a good deal of ingenuity and, as a result, has developed several cost effective methods of processing and handling wood. SMB systems usually cannot afford to perform much onsite processing and therefore usually purchase fuels processed to specification. Owners of larger systems try to minimize onsite processing to minimize processing costs. Whole truck dumpers are expensive, but allow for faster and easier unloading, which reduces labor costs and charges by the haulers. Storage costs are a major factor in overall costs, thus the amount of fuel reserve is an important consideration. Silos and bins are relatively expensive compared to open piles used for larger facilities, but may be required depending on space available, wood characteristics, and amount of wood to be stored. For larger systems, a front-end loader has a lot of flexibility in use and is an essential piece of equipment for moving material. Few opportunities appear to exist for improving the cost effectiveness of these systems.

  10. TO: Procurement Directors FROM: Director, Policy Division

    Broader source: Energy.gov (indexed) [DOE]

    4 DATE: April 7, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT:...

  11. CSLB News and Policies | Open Energy Information

    Open Energy Info (EERE)

    Legal Document- OtherOther: CSLB News and PoliciesLegal Abstract The Colorado State Land Board (CSLB) provides official policy documents on their website. Published NA Year...

  12. Renewable Energy Policy Project | Open Energy Information

    Open Energy Info (EERE)

    Project Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Policy Project AgencyCompany Organization: Renewable Energy Policy Project Sector: Energy...

  13. Integrated Safety Management Policy - DOE Directives, Delegations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P 450.4A, Integrated Safety Management Policy by David Weitzman Functional areas: Integrated Safety Management, Safety The policy establishes DOE's expectation for safety,...

  14. Victoria Transport Policy Institute | Open Energy Information

    Open Energy Info (EERE)

    Transport Policy Institute Jump to: navigation, search Name: Victoria Transport Policy Institute Address: 1250 Rudlin Street, Place: Victoria, British Columbia Website:...

  15. Policy Memorandum #9 - Establishing and Maintaining Competitive...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 - Establishing and Maintaining Competitive Level Codes Policy Memorandum 9 - Establishing and Maintaining Competitive Level Codes PDF icon Policy Memorandum 9 - Establishing...

  16. POLICY GUIDANCE MEMORANDUM #03 Addressing Missclassified Positions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon POLICY GUIDANCE MEMORANDUM 3A Addressing Missclassified Positions Responsible Contacts Jennifer Ackerman Director, Human Capital Policy E-mail jennifer.ackerman@hq.doe.go...

  17. Demand Response - Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demand Response - Policy Demand Response - Policy Since its inception, the Office of Electricity Delivery and Energy Reliability (OE) has been committed to modernizing the nation's ...

  18. NPS Management Policies 2006 | Open Energy Information

    Open Energy Info (EERE)

    Management Policies 2006 Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: NPS Management Policies 2006Permitting...

  19. Geothermal Exploration Cost and Time

    SciTech Connect (OSTI)

    Jenne, Scott

    2013-02-13

    The Department of Energy’s Geothermal Technology Office (GTO) provides RD&D funding for geothermal exploration technologies with the goal of lowering the risks and costs of geothermal development and exploration. The National Renewable Energy Laboratory (NREL) was tasked with developing a metric in 2012 to measure the impacts of this RD&D funding on the cost and time required for exploration activities. The development of this cost and time metric included collecting cost and time data for exploration techniques, creating a baseline suite of exploration techniques to which future exploration cost and time improvements can be compared, and developing an online tool for graphically showing potential project impacts (all available at http://en.openei.org/wiki/Gateway: Geothermal). This paper describes the methodology used to define the baseline exploration suite of techniques (baseline), as well as the approach that was used to create the cost and time data set that populates the baseline. The resulting product, an online tool for measuring impact, and the aggregated cost and time data are available on the Open Energy Information website (OpenEI, http://en.openei.org) for public access. - Published 01/01/2013 by US National Renewable Energy Laboratory NREL.

  20. Analysis of International Policies In The Solar Electricity Sector: Lessons for India

    SciTech Connect (OSTI)

    Deshmukh, Ranjit; Bharvirkar, Ranjit; Gambhir, Ashwin; Phadke, Amol

    2011-08-10

    Although solar costs are dropping rapidly, solar power is still more expensive than conventional and other renewable energy options. The solar sector still needs continuing government policy support. These policies are driven by objectives that go beyond the goal of achieving grid parity. The need to achieve multiple objectives and ensure sufficient political support for solar power makes it diffi cult for policy makers to design the optimal solar power policy. The dynamic and uncertain nature of the solar industry, combined with the constraints offered by broader economic, political and social conditions further complicates the task of policy making. This report presents an analysis of solar promotion policies in seven countries - Germany, Spain, the United States, Japan, China, Taiwan, and India - in terms of their outlook, objectives, policy mechanisms and outcomes. The report presents key insights, primarily in qualitative terms, and recommendations for two distinct audiences. The first audience consists of global policy makers who are exploring various mechanisms to increase the penetration of solar power in markets to mitigate climate change. The second audience consists of key Indian policy makers who are developing a long-term implementation plan under the Jawaharlal Nehru National Solar Mission and various state initiatives.

  1. State options for low-carbon coal policy

    SciTech Connect (OSTI)

    Richard Cowart; Shanna Vale; Joshua Bushinsky; Pat Hogan

    2008-02-15

    There is growing state-level interest in the USA in accelerating the development of low-carbon coal technologies, including carbon capture and storage (CCS). Many states have adopted greenhouse gas emission targets and made commitments to low-carbon energy, and believe that these polices will result in job creation, air quality improvements, and reliable low-cost energy supplies. This paper provides an overview of options for states to encourage the deployment of carbon capture and sequestration. It describes actions (including legislation, regulations, and incentives) throughout the country. It also reviews in greater detail the range of policies available to state Public Utility Commissions for advancing deployment of CCS. Many states are adopting meaningful incentives for integrated gasification combined cycle (IGCC) power plants, and, as a handful of states are beginning to demonstrate, a number of these incentives can apply to CCS as well. States also have a number of authorities relevant to advancement of clean coal power, particularly within the domain of state public utility commissions (PUCs). State commissions have a wide array of policy options available to them in pursuing this goal, and will play a crucial role in determining the speed and effectiveness with which such technologies are deployed. States also enjoy major advantages, such as their direct jurisdiction over many critical power plant issues (including siting and retail ratemaking) that federal agencies do not possess. Regardless of the final form of federal greenhouse gas rules, states have the chance to gain experience as first movers and policy innovators, and will play an important role in shaping a low-carbon future. Although national policy is essential, a proactive approach by state policymakers and regulators to drive CCS can reduce future compliance costs, speed the required technological developments, and pave the way for future national policy.

  2. Cost estimation for solid waste management in industrialising regions - Precedents, problems and prospects

    SciTech Connect (OSTI)

    Parthan, Shantha R.; Milke, Mark W.; Wilson, David C.; Cocks, John H.

    2012-03-15

    Highlights: Black-Right-Pointing-Pointer We review cost estimation approaches for solid waste management. Black-Right-Pointing-Pointer Unit cost method and benchmarking techniques used in industrialising regions (IR). Black-Right-Pointing-Pointer Variety in scope, quality and stakeholders makes cost estimation challenging in IR. Black-Right-Pointing-Pointer Integrate waste flow and cost models using cost functions to improve cost planning. - Abstract: The importance of cost planning for solid waste management (SWM) in industrialising regions (IR) is not well recognised. The approaches used to estimate costs of SWM can broadly be classified into three categories - the unit cost method, benchmarking techniques and developing cost models using sub-approaches such as cost and production function analysis. These methods have been developed into computer programmes with varying functionality and utility. IR mostly use the unit cost and benchmarking approach to estimate their SWM costs. The models for cost estimation, on the other hand, are used at times in industrialised countries, but not in IR. Taken together, these approaches could be viewed as precedents that can be modified appropriately to suit waste management systems in IR. The main challenges (or problems) one might face while attempting to do so are a lack of cost data, and a lack of quality for what data do exist. There are practical benefits to planners in IR where solid waste problems are critical and budgets are limited.

  3. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    policyguidancepolicyflashes.htm. Questions regarding this Policy Flash should be directed to Kevin M. Smith at 202-287-1614, or at Kevin.M.Smith@hq.doe.gov. Attachment...

  4. Policy Flash 2012-61

    Broader source: Energy.gov (indexed) [DOE]

    in the attachments to Policy Flash 2012-25 and posted tolinked from various DOE Internet pages has been withdrawn until further notice. This Flash will be available online at...

  5. Broward County- Green Building Policy

    Broader source: Energy.gov [DOE]

    In October 2008, Board of County Commissioners of Broward County passed a resolution creating the County Green Building Policy. All new County-owned and operated buildings must achieve a minimum...

  6. Policy Flash 2011-95

    Energy Savers [EERE]

    Division Office of Procurement and Assistance Policy Office of Acquisition and Assistance Management SUBJECT: DOE O 452.8 Control of Nuclear Weapon Data SUMMARY: On July 21, 2011,...

  7. Department of Energy Oversight Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25

    The Policy establishes a Department-wide oversight process to protect the public, workers, environment, and national security assets effectively through continuous improvement. Supersedes DOE P 226.1A

  8. Department of Energy Oversight Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-06-10

    The Policy establishes the expectations for effective oversight of performance in security, cyber security, emergency management, environment, safety and health, and business operations. Does not cancel other directives. Canceled by DOE P 226.1A.

  9. Department of Energy Oversight Policy

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-05-25

    The Policy establishes a Department-wide oversight process to protect the public, workers, environment, and national security assets effectively through continuous improvement. Cancels DOE P 226.1. Canceled by DOE P 226.1B

  10. Policy Flash 2005-53

    Broader source: Energy.gov (indexed) [DOE]

    procurement-and-acquisitionpolicy-flashes. Questions concerning this policy flash should be directed to Jason Taylor at (202) 287-1945 or jason.taylor@hq.doe.gov. Attachments...

  11. Department of Energy Web Policy

    Broader source: Energy.gov [DOE]

    This resource for Department of Energy programs and staff offices describes Department-wide web policy and explains how to request a new sub-site on or off Energy.gov.

  12. The impact of climate policies on the operation of a thermal power plant

    SciTech Connect (OSTI)

    Orvika Rosnes

    2008-04-15

    Climate policy measures aimed at power markets influence the cost structure of producers and price patterns, and are therefore likely to influence the production decision of power plants, even in the short run. When power plants have costs related to starting and stopping, decisions on short-term production are intertemporal, and the conventional 'price vs. marginal cost' rule is not sufficient to predict production in thermal power plants. This paper analyzes how the optimal production decision is influenced by climate policies: namely, CO{sub 2} trading mechanisms, the expansion of renewables and the interaction between these policies. The main result is that higher power price variation (as a result of increased wind power production) makes the thermal power producer less flexible, but the effect on emissions is ambiguous. A CO{sub 2} cost (as a result of an emission trading system) increases the flexibility of the producer and the operation decision resembles the conventional 'price vs. marginal cost' rule more. This implies lower emissions. However, when the CO{sub 2} price is coupled with higher power price variation, the positive effects may be reversed since the two policies have opposing effects.

  13. Policy Flash 2013-2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 DATE: October 2, 2012 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Continuing Appropriations Resolution, 2013 -- Congressional Notification of Pending Contract or Financial Assistance Actions in excess of $1 Million under the Continuing Resolution SUMMARY: Section 101(a)(4) of the Continuing Appropriations Resolution Act, 2013, Pub. L No. 112-175, makes

  14. The Role of Technology for Achieving Climate Policy Objectives: Overview of the EMF 27 Study on Technology Strategies and Climate Policy Scenarios

    SciTech Connect (OSTI)

    Kriegler, Elmar; Weyant, John; Blanford, Geoffrey J.; Krey, Volker; Clarke, Leon E.; Edmonds, James A.; Fawcett, Allen A.; Luderer, Gunnar; Riahi, Keywan; Richels, Richard G.; Rose, Steven; Tavoni, Massimo; Van Vuuren, Detlef

    2014-04-01

    This article presents the synthesis of results from the Stanford Energy Modeling Forum Study 27, an inter-comparison of 19 energy-economy and integrated assessment models. The study investigated the value of individual mitigation technologies such as energy intensity improvements, carbon capture and sequestration (CCS), nuclear power, solar and wind power and bioenergy for climate mitigation. Achieving atmospheric greenhouse gas concentration targets at 450 and 550 ppm CO2 equivalent requires massive greenhouse gas emissions reductions. A fragmented policy approach at the level of current ambition is inconsistent with these targets. The availability of a negative emissions technology, in most models biofuels with CCS, proved to be a key element for achieving the climate targets. Robust characteristics of the transformation of the energy system are increased energy intensity improvements and the electrification of energy end use coupled with a fast decarbonization of the electricity sector. Non-electric energy end use is hardest to decarbonize, particularly in the transport sector. Technology is a key element of climate mitigation. Versatile technologies such as CCS and bioenergy have largest value, due in part to their combined ability to produce negative emissions. The individual value of low-carbon power technologies is more limited due to the many alternatives in the sector. The scale of the energy transformation is larger for the 450 ppm than for the 550 ppm CO2e target. As a result, the achievability and the costs of the 450 ppm target are more sensitive to variations in technology variability. Mitigation costs roughly double when moving from 550 ppm to 450 ppm CO2e, but remain below 3% of GDP for most models.

  15. Yearly Energy Costs for Buildings

    Energy Science and Technology Software Center (OSTI)

    1991-03-20

    COSTSAFR3.0 generates a set of compliance forms which will be attached to housing Requests for Proposals (RFPs) issued by Departments or Agencies of the Federal Government. The compliance forms provide a uniform method for estimating the total yearly energy cost for each proposal. COSTSAFR3.0 analyzes specific housing projects at a given site, using alternative fuel types, and considering alternative housing types. The program is designed around the concept of minimizing overall costs through energy conservationmore » design, including first cost and future utility costs, and estabilishes a standard design to which proposed housing designs are compared. It provides a point table for each housing type that can be used to determine whether a proposed design meets the standard and how a design can be modified to meet the standard.« less

  16. Cost Effective Water Heating Solutions

    Broader source: Energy.gov [DOE]

    This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question"Are high-efficiency hot water heating systems worth the cost?"

  17. Wind Electrolysis: Hydrogen Cost Optimization

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Electrolysis: Hydrogen Cost Optimization Genevieve Saur and Todd Ramsden Technical Report NREL/TP-5600-50408 May 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Wind Electrolysis: Hydrogen Cost Optimization Genevieve Saur, Todd

  18. Electricity Generation Cost Simulation Model

    Energy Science and Technology Software Center (OSTI)

    2003-04-25

    The Electricity Generation Cost Simulation Model (GENSIM) is a user-friendly, high-level dynamic simulation model that calculates electricity production costs for variety of electricity generation technologies, including: pulverized coal, gas combustion turbine, gas combined cycle, nuclear, solar (PV and thermal), and wind. The model allows the user to quickly conduct sensitivity analysis on key variables, including: capital, O&M, and fuel costs; interest rates; construction time; heat rates; and capacity factors. The model also includes consideration ofmore » a wide range of externality costs and pollution control options for carbon dioxide, nitrogen oxides, sulfur dioxide, and mercury. Two different data sets are included in the model; one from the U.S. Department of Energy (DOE) and the other from Platt's Research Group. Likely users of this model include executives and staff in the Congress, the Administration and private industry (power plant builders, industrial electricity users and electric utilities). The model seeks to improve understanding of the economic viability of various generating technologies and their emission trade-offs. The base case results using the DOE data, indicate that in the absence of externality costs, or renewable tax credits, pulverized coal and gas combined cycle plants are the least cost alternatives at 3.7 and 3.5 cents/kwhr, respectively. A complete sensitivity analysis on fuel, capital, and construction time shows that these results coal and gas are much more sensitive to assumption about fuel prices than they are to capital costs or construction times. The results also show that making nuclear competitive with coal or gas requires significant reductions in capital costs, to the $1000/kW level, if no other changes are made. For renewables, the results indicate that wind is now competitive with the nuclear option and is only competitive with coal and gas for grid connected applications if one includes the federal production tax credit of 1.8 cents/kwhr.« less

  19. Load Leveling Battery System Costs

    Energy Science and Technology Software Center (OSTI)

    1994-10-12

    SYSPLAN evaluates capital investment in customer side of the meter load leveling battery systems. Such systems reduce the customer's monthly electrical demand charge by reducing the maximum power load supplied by the utility during the customer's peak demand. System equipment consists of a large array of batteries, a current converter, and balance of plant equipment and facilities required to support the battery and converter system. The system is installed on the customer's side of themore » meter and controlled and operated by the customer. Its economic feasibility depends largely on the customer's load profile. Load shape requirements, utility rate structures, and battery equipment cost and performance data serve as bases for determining whether a load leveling battery system is economically feasible for a particular installation. Life-cycle costs for system hardware include all costs associated with the purchase, installation, and operation of battery, converter, and balance of plant facilities and equipment. The SYSPLAN spreadsheet software is specifically designed to evaluate these costs and the reduced demand charge benefits; it completes a 20 year period life cycle cost analysis based on the battery system description and cost data. A built-in sensitivity analysis routine is also included for key battery cost parameters. The life cycle cost analysis spreadsheet is augmented by a system sizing routine to help users identify load leveling system size requirements for their facilities. The optional XSIZE system sizing spreadsheet which is included can be used to identify a range of battery system sizes that might be economically attractive. XSIZE output consisting of system operating requirements can then be passed by the temporary file SIZE to the main SYSPLAN spreadsheet.« less

  20. Price/Cost Proposal Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    PRICE/COST PROPOSAL FORM Page No. of NREL Solicitation Document Number: Offeror's Name and Address: Title of Proposed Effort and Task No., Phase No., or Project Total, As Applicable: Telephone Number: Total Amount of Task/Phase No. ___________ $ _______________________ Proposal Summary Total $ ________________________ DETAIL DESCRIPTION OF COST ELEMENTS 1. DIRECT MATERIALS (Attach Itemized Listing for all Purchased Parts, Purchased Items or Services, Raw Materials, Standard Commercial Items, or

  1. Low Cost Non-Reactive

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Prepared: 10/28/09 Low Cost Non-Reactive Coating for Refractory Metals A non-reactive coating for refractory metals has been developed at The Ames Laboratory. Contamination of rare earth and reactive metals and their alloys has been a chronic problem that results from their interaction with the crucibles or other vessels used in high temperature processing or during other applications. As a consequence, processing and other costs are high due to the need to replace equipment or containers, or

  2. Syngas Mixed Alcohol Cost Validation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1, 2013 DOE Bioenergy Technologies Office: Project Peer Review Syngas Mixed Alcohol Cost Validation Abhijit Dutta, NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Enable research and development of cost-competitive biomass to liquid fuels by providing: - Techno-economic analysis (TEA) - Feedback to the research efforts Specific objective in 2012: Provide TEA and validate DOE BETO's goal to demonstrate technologies capable

  3. Estimated Cost Description Determination Date:

    Office of Environmental Management (EM)

    Revised and posted 2/10/2011 *Title, Location Estimated Cost Description Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain $50,000 FONSI: uncertain Determination Date: uncertain Transmittal to State: uncertain EA Approval: uncertain FONSI: uncertain Total Estimated Cost $70,000 Attachment: Memo, Moody to Marcinowski, III, SUBJECT: NEPA 2011 APS for DOE-SRS, Dated: Annual NEPA Planning Summary Environmental Assessments (EAs) Expected to be Initiated in the Next

  4. Policy Flash 2005-53

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management with Contract Management of Non-Management and Operating (M&O) Cost Reimbursement Contracts for Capital Asset Projects, Environmental Remediation, Decontamination ...

  5. COMMENTARY:Limits to adaptation

    SciTech Connect (OSTI)

    Preston, Benjamin L

    2013-01-01

    An actor-centered, risk-based approach to defining limits to social adaptation provides a useful analytic framing for identifying and anticipating these limits and informing debates over society s responses to climate change.

  6. Diagnostic indicators for integrated assessment models of climate policy

    SciTech Connect (OSTI)

    Kriegler, Elmar; Petermann, Nils; Krey, Volker; Schwanitz, Jana; Luderer, Gunnar; Ashina, Shuichi; Bosetti, Valentina; Eom, Jiyong; Kitous, Alban; Mejean, Aurelie; Paroussos, Leonidas; Sano, Fuminori; Turton, Hal; Wilson, Charlie; Van Vuuren, Detlef

    2015-01-01

    Integrated assessments of how climate policy interacts with energy-economic systems can be performed by a variety of models with different functional structures. This article proposes a diagnostic scheme that can be applied to a wide range of integrated assessment models to classify differences among models based on their carbon price responses. Model diagnostics can uncover patterns and provide insights into why, under a given scenario, certain types of models behave in observed ways. Such insights are informative since model behavior can have a significant impact on projections of climate change mitigation costs and other policy-relevant information. The authors propose diagnostic indicators to characterize model responses to carbon price signals and test these in a diagnostic study with 11 global models. Indicators describe the magnitude of emission abatement and the associated costs relative to a harmonized baseline, the relative changes in carbon intensity and energy intensity and the extent of transformation in the energy system. This study shows a correlation among indicators suggesting that models can be classified into groups based on common patterns of behavior in response to carbon pricing. Such a classification can help to more easily explain variations among policy-relevant model results.

  7. Wind Power: How Much, How Soon, and At What Cost?

    SciTech Connect (OSTI)

    Wiser, Ryan H; Hand, Maureen

    2010-01-01

    The global wind power market has been growing at a phenomenal pace, driven by favorable policies towards renewable energy and the improving economics of wind projects. On a going forward basis, utility-scale wind power offers the potential for significant reductions in the carbon footprint of the electricity sector. Specifically, the global wind resource is vast and, though accessing this potential is not costless or lacking in barriers, wind power can be developed at scale in the near to medium term at what promises to be an acceptable cost.

  8. Gas option: America's least-cost energy strategy

    SciTech Connect (OSTI)

    Lawrence, G.H.

    1980-05-17

    Public energy policy which acknowledges the gas option as having significant potential will increase supply incentives while decreasing demand restraints. The arguments developed by the Mellon Institute and others confirm the need to reject the Title II incremental pricing and the need to implement the Building Energy Performance Standards (BEPS). Positive evidence that proved reserves are higher than was thought has prompted the gas industry to fight incremental pricing as a barrier to a least-cost national energy strategy. BEPS, on the other hand, encourages more efficient use without eliminating industrial use. (DCK)

  9. Small Business First Policy | Department of Energy

    Energy Savers [EERE]

    First Policy Small Business First Policy The text of the U.S. Department of Energy's Small Business First policy. PDF icon Small Business First Policy More Documents & Publications Acquisition Letter: AL2005-08 Chapter 19 - Small Business Programs Guidance of the Department of Energy Subcontracting Program

  10. Spectrum Policy Seminar | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Spectrum Policy Seminar Spectrum Policy Seminar Slide show from FCC's Public Safety and Homeland Security Bureau's presenation on spectrum policy. PDF icon Spectrum Policy Seminar More Documents & Publications An Introduction to Spectrum Engineering Communications Requirements of Smart Grid Technologies Comments of Verizon and Verizon Wireless

  11. OPAM Policy Acquisition Guides | Department of Energy

    Energy Savers [EERE]

    32 - Contract Financing OPAM Policy Acquisition Guides Microsoft Word - AcqGuide71pt1.doc

  12. OPAM Policy Acquisition Guides | Department of Energy

    Energy Savers [EERE]

    3 - Simplified Acquisition Procedures OPAM Policy Acquisition Guides Chapter 18 - Emergency Acquisitions

  13. NUCLEAR ENERGY SYSTEM COST MODELING

    SciTech Connect (OSTI)

    Francesco Ganda; Brent Dixon

    2012-09-01

    The U.S. Department of Energy’s Fuel Cycle Technologies (FCT) Program is preparing to perform an evaluation of the full range of possible Nuclear Energy Systems (NES) in 2013. These include all practical combinations of fuels and transmuters (reactors and sub-critical systems) in single and multi-tier combinations of burners and breeders with no, partial, and full recycle. As part of this evaluation, Levelized Cost of Electricity at Equilibrium (LCAE) ranges for each representative system will be calculated. To facilitate the cost analyses, the 2009 Advanced Fuel Cycle Cost Basis Report is being amended to provide up-to-date cost data for each step in the fuel cycle, and a new analysis tool, NE-COST, has been developed. This paper explains the innovative “Island” approach used by NE-COST to streamline and simplify the economic analysis effort and provides examples of LCAE costs generated. The Island approach treats each transmuter (or target burner) and the associated fuel cycle facilities as a separate analysis module, allowing reuse of modules that appear frequently in the NES options list. For example, a number of options to be screened will include a once-through uranium oxide (UOX) fueled light water reactor (LWR). The UOX LWR may be standalone, or may be the first stage in a multi-stage system. Using the Island approach, the UOX LWR only needs to be modeled once and the module can then be reused on subsequent fuel cycles. NE-COST models the unit operations and life cycle costs associated with each step of the fuel cycle on each island. This includes three front-end options for supplying feedstock to fuel fabrication (mining/enrichment, reprocessing of used fuel from another island, and/or reprocessing of this island’s used fuel), along with the transmuter and back-end storage/disposal. Results of each island are combined based on the fractional energy generated by each islands in an equilibrium system. The cost analyses use the probability distributions of key parameters and employs Monte Carlo sampling to arrive at an island’s cost probability density function (PDF). When comparing two NES to determine delta cost, strongly correlated parameters can be cancelled out so that only the differences in the systems contribute to the relative cost PDFs. For example, one comparative analysis presented in the paper is a single stage LWR-UOX system versus a two-stage LWR-UOX to LWR-MOX system. In this case, the first stage of both systems is the same (but with different fractional energy generation), while the second stage of the UOX to MOX system uses the same type transmuter but the fuel type and feedstock sources are different. In this case, the cost difference between systems is driven by only the fuel cycle differences of the MOX stage.

  14. Southeast Regional Clean Energy Policy Analysis

    SciTech Connect (OSTI)

    McLaren, Joyce

    2011-04-01

    More than half of the electricity produced in the southeastern states is fuelled by coal. Although the region produces some coal, most of the states depend heavily on coal imports. Many of the region's aging coal power facilities are planned for retirement within the next 20 years. However, estimates indicate that a 20% increase in capacity is needed over that time to meet the rapidly growing demand. The most common incentives for energy efficiency in the Southeast are loans and rebates; however, total public spending on energy efficiency is limited. The most common state-level policies to support renewable energy development are personal and corporate tax incentives and loans. The region produced 1.8% of the electricity from renewable resources other than conventional hydroelectricity in 2009, half of the national average. There is significant potential for development of a biomass market in the region, as well as use of local wind, solar, methane-to-energy, small hydro, and combined heat and power resources. Options are offered for expanding and strengthening state-level policies such as decoupling, integrated resource planning, building codes, net metering, and interconnection standards to support further clean energy development. Benefits would include energy security, job creation, insurance against price fluctuations, increased value of marginal lands, and local and global environmental paybacks.

  15. Southeast Regional Clean Energy Policy Analysis (Revised)

    SciTech Connect (OSTI)

    McLaren, J.

    2011-04-01

    More than half of the electricity produced in the southeastern states is fuelled by coal. Although the region produces some coal, most of the states depend heavily on coal imports. Many of the region's aging coal power facilities are planned for retirement within the next 20 years. However, estimates indicate that a 20% increase in capacity is needed over that time to meet the rapidly growing demand. The most common incentives for energy efficiency in the Southeast are loans and rebates; however, total public spending on energy efficiency is limited. The most common state-level policies to support renewable energy development are personal and corporate tax incentives and loans. The region produced 1.8% of the electricity from renewable resources other than conventional hydroelectricity in 2009, half of the national average. There is significant potential for development of a biomass market in the region, as well as use of local wind, solar, methane-to-energy, small hydro, and combined heat and power resources. Options are offered for expanding and strengthening state-level policies such as decoupling, integrated resource planning, building codes, net metering, and interconnection standards to support further clean energy development. Benefits would include energy security, job creation, insurance against price fluctuations, increased value of marginal lands, and local and global environmental paybacks.

  16. Hudol Limited | Open Energy Information

    Open Energy Info (EERE)

    Carmarthen, Wales, United Kingdom Zip: SA31 1TN Sector: Biomass Product: Wales-based firm with a licence that allows cost efficient gas production from biomass and Refuse...

  17. E-print Network Website Policies and Important Links -- Energy...

    Office of Scientific and Technical Information (OSTI)

    Website Policies Important Links Javascript Not Enabled OSTI Security Website Policies and Important Links

  18. Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage

    SciTech Connect (OSTI)

    Glatzmaier, G.

    2011-12-01

    This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation system leads to higher thermal-to-electric conversion efficiency. However, in a CSP system, higher operating temperature also leads to greater thermal losses. These two effects combine to give an optimal system-level operating temperature that may be less than the upper operating temperature limit of system components. The overall efficiency may be improved by developing materials, power cycles, and system-integration strategies that enable operation at elevated temperature while limiting thermal losses. This is particularly true for the TES system and its components. Meeting the SunShot cost target will require cost and performance improvements in all systems and components within a CSP plant. Solar collector field hardware will need to decrease significantly in cost with no loss in performance and possibly with performance improvements. As higher temperatures are considered for the power block, new working fluids, heat-transfer fluids (HTFs), and storage fluids will all need to be identified to meet these new operating conditions. Figure 1 shows thermodynamic conversion efficiency as a function of temperature for the ideal Carnot cycle and 75% Carnot, which is considered to be the practical efficiency attainable by current power cycles. Current conversion efficiencies for the parabolic trough steam cycle, power tower steam cycle, parabolic dish/Stirling, Ericsson, and air-Brayton/steam Rankine combined cycles are shown at their corresponding operating temperatures. Efficiencies for supercritical steam and carbon dioxide (CO{sub 2}) are also shown for their operating temperature ranges.

  19. Costs and benefits of energy efficiency improvements in ceiling fans

    SciTech Connect (OSTI)

    Shah, Nihar; Sathaye, Nakul; Phadke, Amol; Letschert, Virginie

    2013-10-15

    Ceiling fans contribute significantly to residential electricity consumption, especially in developing countries with warm climates. The paper provides analysis of costs and benefits of several options to improve the efficiency of ceiling fans to assess the global potential for electricity savings and green house gas (GHG) emission reductions. Ceiling fan efficiency can be cost-effectively improved by at least 50% using commercially available technology. If these efficiency improvements are implemented in all ceiling fans sold by 2020, 70 terawatt hours per year could be saved and 25 million metric tons of carbon dioxide equivalent (CO2-e) emissions per year could be avoided, globally. We assess how policies and programs such as standards, labels, and financial incentives can be used to accelerate the adoption of efficient ceiling fans in order to realize potential savings.

  20. Energy related environmental policies in Turkey

    SciTech Connect (OSTI)

    Kaygusuz, K.; Bilgen, S.

    2008-07-01

    There is increasing consensus in both the scientific and political communities that significant reductions in greenhouse gas (GHG) emissions are necessary to limit the magnitude and extent of climate change. Renewable energy systems already reduce GHG emissions from the energy sector, although on a modest scale. Turkey is heavily dependent on expensive imported energy resources (oil, gas, and coal) that place a big burden on the economy, and air pollution is becoming a great environmental concern in the country. In this regard, renewable energy resources appear to be one of the most efficient and effective solutions for clean and sustainable energy development in Turkey. Turkey's geographical location has several advantages for extensive use of most of these renewable energy sources. This article presents a review of the energy related environmental policies in Turkey.

  1. Policy and Analysis Team | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Programs » Policy and Analysis Team Policy and Analysis Team The mission of Policy and Analysis is to provide a consistent, objective, and credible analysis for the Office of Energy Efficiency and Renewable Energy's (EERE's) activities and an understanding of the effect of various policies on EERE's core mission. This includes guiding investment decisions through data and scenario analyses in order to maximize their effectiveness and return on investment for the taxpayer. The Policy

  2. Policy Flash 2012-21 | Department of Energy

    Energy Savers [EERE]

    1 Policy Flash 2012-21 Attached is Policy Flash 2012-21 Class Deviation on Trade Agreements. PolicyFlash2012-21.pdf More Documents & Publications Policy Flash 2012-30 Policy...

  3. Break-Even Cost for Residential Photovoltaics in the United States: Key Drivers and Sensitivities

    SciTech Connect (OSTI)

    Denholm, P.; Margolis, R. M.; Ong, S.; Roberts, B.

    2009-12-01

    Grid parity--or break-even cost--for photovoltaic (PV) technology is defined as the point where the cost of PV-generated electricity equals the cost of electricity purchased from the grid. Break-even cost is expressed in $/W of an installed system. Achieving break-even cost is a function of many variables. Consequently, break-even costs vary by location and time for a country, such as the United States, with a diverse set of resources, electricity prices, and other variables. In this report, we analyze PV break-even costs for U.S. residential customers. We evaluate some key drivers of grid parity both regionally and over time. We also examine the impact of moving from flat to time-of-use (TOU) rates, and we evaluate individual components of the break-even cost, including effect of rate structure and various incentives. Finally, we examine how PV markets might evolve on a regional basis considering the sensitivity of the break-even cost to four major drivers: technical performance, financing parameters, electricity prices and rates, and policies. We find that local incentives rather than ?technical? parameters are in general the key drivers of the break-even cost of PV. Additionally, this analysis provides insight about the potential viability of PV markets.

  4. Making appropriate comparisons of estimated and actual costs of reducing SO{sub 2} emissions under Title IV

    SciTech Connect (OSTI)

    Smith, A.E.

    1998-12-31

    A current sentiment within some parts of the environmental policy community is that market-based regulatory approaches such as emissions trading have proven so effective that actual costs will be only a small fraction of what ex ante cost estimation procedures would project. With this line of reasoning, some have dismissed available cost estimates for major proposed new regulations, such as the new PM and ozone NAAQS, as not meaningful for policy decisions. The most commonly used evidence in support of this position is the experience with SO{sub 2} reductions under Title IV of the 1990 Clean Air Act Amendments. In Title IV, a market for emissions allowances has been used to achieve reductions in sulfur dioxides (SO{sub 2}) to ameliorate acid rain. It is commonly asserted today that the cost of achieving the SO{sub 2} emissions reductions has been only one-tenth or less of what Title IV was originally expected to cost. This paper demonstrates that, to the contrary, actual costs for SO{sub 2} reductions remain roughly in line with original estimates associated with Title IV. Erroneous conclusions about Title IV`s costs are due to inappropriate comparisons of a variety of different measures that appear to be comparable only because they are all stated in dollars per ton. Program cost estimates include the total costs of a fully-implemented regulatory program. The very low costs of Title IV that are commonly cited today are neither directly reflective of a fully implemented Title IV, (which is still many years away) nor reflective of all the costs already incurred. Further, a careful review of history finds that the initial cost estimates that many cite were never associated with Title IV. Technically speaking, people are comparing the estimated control costs for the most-costly power plant associated with earlier acid rain regulatory proposals with prices from a market that do not directly reflect total costs.

  5. Modifications to Replacement Costs System

    SciTech Connect (OSTI)

    Godec, M. [ICF Resources, Inc., Fairfax, VA (United States)

    1989-05-18

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985.

  6. Cost-Causation and Integration Cost Analysis for Variable Generation

    SciTech Connect (OSTI)

    Milligan, M.; Ela, E.; Hodge, B. M.; Kirby, B.; Lew, D.; Clark, C.; DeCesaro, J.; Lynn, K.

    2011-06-01

    This report examines how wind and solar integration studies have evolved, what analysis techniques work, what common mistakes are still made, what improvements are likely to be made in the near future, and why calculating integration costs is such a difficult problem and should be undertaken carefully, if at all.

  7. POLICY GUIDANCE MEMORANDUM #27 Certification Program on Prohibited

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Personnel Practices and Whistleblower Protections | Department of Energy 7 Certification Program on Prohibited Personnel Practices and Whistleblower Protections POLICY GUIDANCE MEMORANDUM #27 Certification Program on Prohibited Personnel Practices and Whistleblower Protections Congress enacted 5 U.S.C. § 2302(c) in response to reports of limited understanding in the federal workforce concerning employees' right to be free from prohibited personnel practices, especially retaliation for

  8. GAO Cost Estimating and Assessment Guide

    Broader source: Energy.gov [DOE]

    GAO Cost Estimating and Assessment Guide: Twelve Steps of a High-Quality Cost Estimating Process, from the first step of defining the estimate's purpose to the last step of updating the estimate to reflect actual costs and changes.

  9. Microsoft Word - Levelized Cost of Energy Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    It takes into account all costs of generating electricity, including capital costs, ... - see OK wind capacity factor above o Capital cost - 1.75 mmMW (includes regional ...

  10. Policy enabled information sharing system

    DOE Patents [OSTI]

    Jorgensen, Craig R.; Nelson, Brian D.; Ratheal, Steve W.

    2014-09-02

    A technique for dynamically sharing information includes executing a sharing policy indicating when to share a data object responsive to the occurrence of an event. The data object is created by formatting a data file to be shared with a receiving entity. The data object includes a file data portion and a sharing metadata portion. The data object is encrypted and then automatically transmitted to the receiving entity upon occurrence of the event. The sharing metadata portion includes metadata characterizing the data file and referenced in connection with the sharing policy to determine when to automatically transmit the data object to the receiving entity.

  11. National Policy Assurances - September 2007

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEPTEMBER 2007) To the extent that a term does not apply to a particular type of activity or award, it is self- deleting. I. Nondiscrimination Policies You must comply with applicable provisions of the following national policies prohibiting discrimination: 1 On the basis of race, color, or national origin, in Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq.), as implemented by DOE regulations at 10 CFR part 1040; 2 On the basis of sex or blindness, in Title IX of the Education

  12. Web Policies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy.gov » Web Policies Web Policies Accessibility The U.S. Department of Energy is committed to providing access to our web pages for individuals with disabilities. To meet this commitment, this site is built to comply with the requirements of Section 508 of the Rehabilitation Act. Section 508 requires that individuals with disabilities, who are members of the public seeking information or services from us, have access to and use of information and data that is comparable to that provided to

  13. OMB Policies | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OMB Policies OMB Policies motherboard-857100_960_720.jpg Cybersecurity & Privacy OMB M-00-07, Incorporating and Funding Security in Information Systems Investments (02-28-2000) OMB M-02-01, Guidance for Preparing and Submitting Security Plans of Action and Milestones(10-19-2001) OMB M-02-09, Reporting Instructions for the Government Information Security Reform Act and Updated Guidance on Security Plans of Action and Milestones (07-02-2002) (pdf) OMB M-03-04, Determination Orders Organizing

  14. Policies to Support Wind Power Deployment: Key Considerations and Good Practices

    SciTech Connect (OSTI)

    Cox, Sadie; Tegen, Suzanne; Baring-Gould, Ian; Oteri, Frank A.; Esterly, Sean; Forsyth, Trudy; Baranowski, Ruth

    2015-05-19

    Policies have played an important role in scaling up wind deployment and increasing its economic viability while also supporting country-specific economic, social, and environmental development goals. Although wind power has become cost-competitive in several contexts, challenges to wind power deployment remain. Within the context of country-specific goals and challenges, policymakers are seeking

  15. Alternative Fuels Data Center: Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Tools Printable Version Share this resource Send a link to Alternative Fuels Data Center: Vehicle Cost Calculator to someone by E-mail Share Alternative Fuels Data Center: Vehicle Cost Calculator on Facebook Tweet about Alternative Fuels Data Center: Vehicle Cost Calculator on Twitter Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Google Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Delicious Rank Alternative Fuels Data Center: Vehicle Cost Calculator on

  16. California Biomass Collaborative Energy Cost Calculators | Open...

    Open Energy Info (EERE)

    Biomass Collaborative Energy Cost Calculators Jump to: navigation, search Tool Summary LAUNCH TOOL Name: California Biomass Collaborative Energy Cost Calculators AgencyCompany...

  17. Property:Cost | Open Energy Information

    Open Energy Info (EERE)

    Cost Jump to: navigation, search This is a property of type Number. Retrieved from "http:en.openei.orgwindex.php?titleProperty:Cost&oldid285418...

  18. Benchmark the Fuel Cost of Steam Generation

    Broader source: Energy.gov [DOE]

    This tip sheet on benchmarking the fuel cost of steam provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  19. Hydrogen Production Cost Estimate Using Biomass Gasification...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Estimate Using Biomass Gasification: Independent Review Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review This independent review is the ...

  20. Example Cost Codes for Construction Projects

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

  1. Reducing Photovoltaic Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Photovoltaics Reducing Photovoltaic Costs Reducing Photovoltaic Costs Photo of gloved hands pouring liquid from a glass bottle to glass beaker. The development of more ...

  2. Benchmarking and Disclosure: State and Local Policy Design Guide and Sample Policy Language

    SciTech Connect (OSTI)

    Existing Commercial Buildings Working Group

    2012-05-16

    Provides sample policy language based on a synthesis of existing state and local policies, and discussion on key provisions, for the design of a commercial benchmarking and disclosure policy.

  3. Feed-in Tariff Policy: Design, Implementation, and RPS Policy Interactions

    Broader source: Energy.gov [DOE]

    This report explores the design and implementation of feed-in tariff policies, including a policy definition, various payment structures, and payment differentiation options. The report also discusses the interaction between FIT and RPS policies.

  4. Multi-Year Analysis Examines Costs, Benefits, and Impacts of Renewable Portfolio Standards (Fact Sheet), NREL National Renewable Energy Laboratory)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    states consider revising renewable portfolio standard (RPS) programs or developing new ones, careful assessments of the costs, benefits, and other impacts of existing policies will be critical. RPS programs currently exist in 29 states and Washington, D.C. Many of these policies, which were enacted largely during the late 1990s and 2000s, will reach their terminal targets by the end of this decade. The National Renewable Energy Laboratory (NREL) and Lawrence Berkeley National Laboratory (LBNL)

  5. NREL Proves Cellulosic Ethanol Can Be Cost Competitive (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2013-11-01

    Ethanol from non-food sources - known as "cellulosic ethanol" - is a near-perfect transportation fuel: it is clean, domestic, abundant, and renewable, and it can potentially replace 30% of the petroleum consumed in the United States, but its relatively high cost has limited its market. That changed in 2012, when the National Renewable Energy Laboratory (NREL) demonstrated the technical advances needed to produce cellulosic ethanol at a minimum ethanol selling price of $2.15/gallon (in 2007 dollars). Through a multi-year research project involving private industry, NREL has proven that cellulosic ethanol can be cost competitive with other transportation fuels.

  6. PURAC Limited | Open Energy Information

    Open Energy Info (EERE)

    technology and project management company in the environment sector and specialising in water, wastewater and municpal waste treatment. References: PURAC Limited1 This article...

  7. Lysanda Limited | Open Energy Information

    Open Energy Info (EERE)

    CM8 3GA Product: US-based vehicle engineering consultancy with a technology capable of playing a role in vehicle emissions management. References: Lysanda Limited1 This...

  8. Solfex Limited | Open Energy Information

    Open Energy Info (EERE)

    Jump to: navigation, search Name: Solfex Limited Address: Energy Arena Bannister Hall Works Off Shop Lane, Higher Walton Preston, Lancashire PR5 4DZ Place: Preston, United...

  9. Regulatory cost-risk study

    SciTech Connect (OSTI)

    Not Available

    1983-04-01

    This study is intended to provide some quantitative perspective by selecting certain examples of criteria for which estimates of risks and costs can be obtained, and the balance of the various risks, (i.e., internal versus external risks), can be put into perspective. 35 refs., 39 tabs. (JDB)

  10. Pollution prevention cost savings potential

    SciTech Connect (OSTI)

    Celeste, J.

    1994-12-01

    The waste generated by DOE facilities is a serious problem that significantly impacts current operations, increases future waste management costs, and creates future environmental liabilities. Pollution Prevention (P2) emphasizes source reduction through improved manufacturing and process control technologies. This concept must be incorporated into DOE`s overall operating philosophy and should be an integral part of Total Quality Management (TQM) program. P2 reduces the amount of waste generated, the cost of environmental compliance and future liabilities, waste treatment, and transportation and disposal costs. To be effective, P2 must contribute to the bottom fine in reducing the cost of work performed. P2 activities at LLNL include: researching and developing innovative manufacturing; evaluating new technologies, products, and chemistries; using alternative cleaning and sensor technologies; performing Pollution Prevention Opportunity Assessments (PPOAs); and developing outreach programs with small business. Examples of industrial outreach are: innovative electroplating operations, printed circuit board manufacturing, and painting operations. LLNL can provide the infrastructure and technical expertise to address a wide variety of industrial concerns.

  11. Wind Electrolysis: Hydrogen Cost Optimization

    SciTech Connect (OSTI)

    Saur, G.; Ramsden, T.

    2011-05-01

    This report describes a hydrogen production cost analysis of a collection of optimized central wind based water electrolysis production facilities. The basic modeled wind electrolysis facility includes a number of low temperature electrolyzers and a co-located wind farm encompassing a number of 3MW wind turbines that provide electricity for the electrolyzer units.

  12. Mandatory Photovoltaic System Cost Estimate

    Broader source: Energy.gov [DOE]

    If the customer has a ratio of estimated monthly kilowatt-hour (kWh) usage to line extension mileage that is less than or equal to 1,000, the utility must provide the comparison at no cost. If the...

  13. Examples of Cost Estimation Packages

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

  14. Market and policy barriers to energy storage deployment : a study for the energy storage systems program.

    SciTech Connect (OSTI)

    Bhatnagar, Dhruv; Currier, Aileen B.; Hernandez, Jacquelynne; Ma, Ookie; Kirby, Brendan

    2013-09-01

    Electric energy storage technologies have recently been in the spotlight, discussed as essential grid assets that can provide services to increase the reliability and resiliency of the grid, including furthering the integration of variable renewable energy resources. Though they can provide numerous grid services, there are a number of factors that restrict their current deployment. The most significant barrier to deployment is high capital costs, though several recent deployments indicate that capital costs are decreasing and energy storage may be the preferred economic alternative in certain situations. However, a number of other market and regulatory barriers persist, limiting further deployment. These barriers can be categorized into regulatory barriers, market (economic) barriers, utility and developer business model barriers, crosscutting barriers and technology barriers. This report, through interviews with stakeholders and review of regulatory filings in four regions roughly representative of the United States, identifies the key barriers restricting further energy storage development in the country. The report also includes a discussion of possible solutions to address these barriers and a review of initiatives around the country at the federal, regional and state levels that are addressing some of these issues. Energy storage could have a key role to play in the future grid, but market and regulatory issues have to be addressed to allow storage resources open market access and compensation for the services they are capable of providing. Progress has been made in this effort, but much remains to be done and will require continued engagement from regulators, policy makers, market operators, utilities, developers and manufacturers.

  15. Policy Overview and Options for Maximizing the Role of Policy in Geothermal

    Office of Scientific and Technical Information (OSTI)

    Electricity Development (Technical Report) | SciTech Connect Policy Overview and Options for Maximizing the Role of Policy in Geothermal Electricity Development Citation Details In-Document Search Title: Policy Overview and Options for Maximizing the Role of Policy in Geothermal Electricity Development This research explores the effectiveness of the historical and current body of policies in terms of increased geothermal electricity development. Insights are provided into future policies

  16. POLICY FLASH 2014-16 In September 2012, DOE issued Policy Flash 2012-67,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Acquisition Savings Reporting Template Guidance to fully comply with reporting requirements. This is an update to that Policy Flash. | Department of Energy POLICY FLASH 2014-16 In September 2012, DOE issued Policy Flash 2012-67, Acquisition Savings Reporting Template Guidance to fully comply with reporting requirements. This is an update to that Policy Flash. » POLICY FLASH 2014-16 In September 2012, DOE issued Policy Flash 2012-67, Acquisition Savings Reporting Template Guidance to fully

  17. Argonne Policies | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne Policies Safety at Work EMC User Safety Scheduled Maintenance Periods Transportation For Industrial Users Acknowledgment Statements for Publications End of Experiment Survey Users Executive Committee People Publications 2015 Publications 2014 Publications 2013 Publications 2012 Publications 2011 Publications 2010 Publications 2009 Publications 2008 Publications 2007 Publications 2006 Publications Fact Sheets & Other Documents Acknowledgment Statement News & Events RESEARCH

  18. Tribal Policy Document | Department of Energy

    Office of Environmental Management (EM)

    Tribal Policy Document Tribal Policy Document DOE Order: DOE O 144.1 Approved: 1-16-09 Admin Chg 1: 11-6-09 Subject: Department of Energy American Indian Tribal Government Interactions and Policy PDF icon Tribal_Policy_Document_o144_1AdmChg1Clean11-9-09.pdf More Documents & Publications DOE Order 144.1 - Department of Energy American Indian Tribal Government Interactions and Policy (2009) DOE Order 144.1: Department of Energy American Indian Tribal Government Interactions and Policy (2009)

  19. Energy Audits and Retro-Commissioning: State and Local Policy Design Guide and Sample Policy Language

    SciTech Connect (OSTI)

    2013-07-29

    Provides guidance and sample policy language to help state and local governments enact and implement policies addressing energy assessments of or improvements to existing commercial buildings

  20. TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 DATE: May 23, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive Salary Actions SUMMARY: The purpose of Acquisition Letter (AL) 2014-07 is to establish the form, "Compensation Subject to the Executive CAP (OFPP Limitation)" as the minimum required documentation to support DOE/NNSA Contracting

  1. Limiting net greenhouse gas emissions in the United States

    SciTech Connect (OSTI)

    Bradley, R A; Watts, E C; Williams, E R

    1991-09-01

    In 1988, Congress requested that DOE produce a study on carbon dioxide inventory and policy to provide an inventory of emissions sources and to analyze policies to achieve a 20% reduction in carbon dioxide emissions in 5 to 10 years and a 50% reduction in 15 to 20 years. Energy and environmental technology data were analyzed using computational analysis models. This information was then evaluated, drawing on current scientific understanding of global climate change, the possible consequences of anthropogenic climate change (change caused by human activity) and the relationship between energy production and use and the emission of radiatively important gases. Topics discussed include: state of the science in estimating atmosphere/climate change relationships, the potential consequences of atmosphere/climate change, us greenhouse emissions past and present, an approach to analyzing the technical potential and cost of reducing US energy-related greenhouse gas emissions, current policy base and National Energy Strategy actions, fiscal instruments, regulatory instruments, combined strategies and instruments, macroeconomic impacts, carbon taxation and international trade, a comparison to other studies.

  2. Net Metering Policy Development and Distributed Solar Generation in Minnesota: Overview of Trends in Nationwide Policy Development and Implications of Increasing the Eligible System Size Cap

    SciTech Connect (OSTI)

    Doris, E.; Busche, S.; Hockett, S.

    2009-12-01

    The goal of the Minnesota net metering policy is to give the maximum possible encouragement to distributed generation assets, especially solar electric systems (MN 2008). However, according to a published set of best practices (NNEC 2008) that prioritize the maximum development of solar markets within states, the Minnesota policy does not incorporate many of the important best practices that may help other states transform their solar energy markets and increase the amount of grid-connected distributed solar generation assets. Reasons cited include the low system size limit of 40kW (the best practices document recommends a 2 MW limit) and a lack of language protecting generators from additional utility fees. This study was conducted to compare Minnesota's policies to national best practices. It provides an overview of the current Minnesota policy in the context of these best practices and other jurisdictions' net metering policies, as well as a qualitative assessment of the impacts of raising the system size cap within the policy based on the experiences of other states.

  3. Order Module--DOE O 451.1B, NATIONAL ENVIRONMENTAL POLICY ACT COMPLIANCE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PROGRAM | Department of Energy Order Module--DOE O 451.1B, NATIONAL ENVIRONMENTAL POLICY ACT COMPLIANCE PROGRAM Order Module--DOE O 451.1B, NATIONAL ENVIRONMENTAL POLICY ACT COMPLIANCE PROGRAM DOE O 451.1B, National Environmental Policy Act Compliance Program, replaces DOE O 451.1A of the same name. DOE O 451.1B is ten pages long. Due to the concise nature of this Order, this module will be limited to one level. To complete this module and satisfy the requirements for qualification 1. Obtain

  4. Low Cost, Durable Seal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost, Durable Seal Low Cost, Durable Seal This presentation, which focuses on low cost, durable seals, was given by George Roberts of UTC Power at a February 2007 meeting on new fuel cell projects. PDF icon new_fc_roberts_utc.pdf More Documents & Publications Improved AST's Based on Real World FCV Data Low Cost Durable Seal Breakout Group 3: Water Management

  5. Hydrogen Pathway Cost Distributions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pathway Cost Distributions Hydrogen Pathway Cost Distributions Presentation on hydrogen pathway cost distributions presented January 25, 2006. PDF icon wkshp_storage_uihlein.pdf More Documents & Publications Manufacturing Cost Analysis of 1 kW and 5 kW Solid Oxide Fuel Cell (SOFC) for Auxiliary Power Applications Pathway and Resource Overview HyPro: Modeling the Hydrogen Transition

  6. Novel, Low-Cost Nanoparticle Production

    SciTech Connect (OSTI)

    2011-05-31

    Fact sheet describing a modular hybrid plasma reactor and process to manufacture low-cost nanoparticles

  7. Cost Study Manual | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Cost Study Manual Cost Study Manual Update 6/29/12. PDF icon Memo regarding Cost Study Manual PDF icon Cost Study Manual More Documents & Publications Contractor Human Resources Management QER - Comment of Energy Innovation 7 QER - Comment of Energy Innovation 6

  8. 2016 NASEO Energy Policy Outlook Conference

    Broader source: Energy.gov [DOE]

    NASEO’s Energy Policy Outlook Conference is the national forum to connect with and learn from state energy officials working on innovative energy policies and programs, and to engage with federal officials on priority energy issues.

  9. Form:EZFeed Policy | Open Energy Information

    Open Energy Info (EERE)

    Help Apps Datasets Community Login | Sign Up Search Form Edit History Form:EZFeed Policy Jump to: navigation, search This is the 'EZFeed Policy' form. To add a page with this...

  10. Farmland Protection Policy Act | Open Energy Information

    Open Energy Info (EERE)

    Farmland Protection Policy Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Farmland Protection Policy ActLegal Abstract...

  11. Policy Analysis System (Polysys) | Open Energy Information

    Open Energy Info (EERE)

    polysys.html OpenEI Keyword(s): EERE tool, Policy Analysis System, Polysys Language: English References: Agricultural Policy Analysis Center Research Tools1 Model U.S....

  12. Water Availability, Cost, and Use

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Availability, Cost, and Use - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs

  13. Factors Affecting PMU Installation Costs

    Office of Environmental Management (EM)

    September 2014 United States Department of Energy Washington, DC 20585 Department of Energy | September 2014 Factors Affecting PMU Installation Costs | Page ii Acknowledgments This report was sponsored by the U.S. Department of Energy's Office of Electricity Delivery and Energy Reliability (DOE-OE) and drafted by the Oak Ridge National Laboratory (ORNL). The effort was directed and supported by DOE program manager Joseph Paladino. The lead authors are Marcus Young of ORNL and Alison Silverstein

  14. Clean Energy Manufacturing: U.S. Competitiveness and State Policy Strategies (Presentation), NREL (National Renewable Energy Laboratory)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Clean Energy Manufacturing: U.S. Competitiveness and State Policy Strategies NGA Policy Academy: Economic Development in the Clean Energy Sector Eric Lantz (NREL) National Governors Association December 9, 2013 NREL/PR-6A20-61265 2 Disclaimer and Acknowledgements DISCLAIMER AGREEMENT These manufacturing cost model results ("Data") are provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy LLC

  15. Confronting Regulatory Cost and Quality Expectations. An Exploration of Technical Change in Minimum Efficiency Performance Standards

    SciTech Connect (OSTI)

    Taylor, Margaret; Spurlock, C. Anna; Yang, Hung-Chia

    2015-09-21

    The dual purpose of this project was to contribute to basic knowledge about the interaction between regulation and innovation and to inform the cost and benefit expectations related to technical change which are embedded in the rulemaking process of an important area of national regulation. The area of regulation focused on here is minimum efficiency performance standards (MEPS) for appliances and other energy-using products. Relevant both to U.S. climate policy and energy policy for buildings, MEPS remove certain product models from the market that do not meet specified efficiency thresholds.

  16. Microsoft Word - National Policy AssurancesAwardTermsREVJuly2005...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Policy AssurancesAwardTermsREVJuly2005.doc Microsoft Word - National Policy AssurancesAwardTermsREVJuly2005.doc PDF icon Microsoft Word - National Policy...

  17. Gateway:Incentives and Policies | Open Energy Information

    Open Energy Info (EERE)

    XML archive Browse by Type Renewables & Energy Efficiency Policies (4429) Energy Efficiency Policies Renewable Energy Policies Financial Incentives (2187) Corporate Tax...

  18. Policy Flash 2012-31 | Department of Energy

    Energy Savers [EERE]

    Foreign Travel. Questions concerning this policy flash should be directed to Kevin M. Smith of the Contract and Financial Assistance Policy Division, Office of Policy, Office of...

  19. State Assistance for Recovery Act Related Electricity Policies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Assistance for Recovery Act Related Electricity Policies: Awards State Assistance for Recovery Act Related Electricity Policies: Awards List of State Energy Policy Awards under the...

  20. Microsoft Word - Policy Flash 2010-77 Attachment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Attachment Microsoft Word - Policy Flash 2010-77 Attachment Microsoft Word - Policy Flash 2010-77 Attachment More Documents & Publications Microsoft Word - Policy Flash 2010-78...

  1. Microsoft Word - Policy Flash 2010-81 Attachment 1 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Attachment 1 Microsoft Word - Policy Flash 2010-81 Attachment 1 Microsoft Word - Policy Flash 2010-81 Attachment 1 More Documents & Publications Microsoft Word - Policy Flash...

  2. Microsoft Word - Policy Flash 2010-82 Attachment 1 | Department...

    Broader source: Energy.gov (indexed) [DOE]

    2 Attachment 1 More Documents & Publications Policy Flash 2010-82 Microsoft Word - Policy Flash 2008-07.doc Microsoft Word - Policy Flash 2008-10.doc...

  3. Attachment 1: Green Lease Policies and Procedures for Lease Acquisitio...

    Energy Savers [EERE]

    Attachment 1: Green Lease Policies and Procedures for Lease Acquisition Attachment 1: Green Lease Policies and Procedures for Lease Acquisition PDF icon Green Lease Policies and...

  4. Policy Flash 2015-03 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Policy Flash 2015-03 DATE: October 6, 2014 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office...

  5. Policy Flash 2014-19 Electronic Products Environmental Assessment...

    Broader source: Energy.gov (indexed) [DOE]

    Questions concerning this policy flash should be directed to Sharon Archer of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and...

  6. LBNL Renewable Energy Market and Policy Analysis | Open Energy...

    Open Energy Info (EERE)

    LBNL Renewable Energy Market and Policy Analysis Jump to: navigation, search Logo: Renewable Energy Market and Policy Analysis at LBNL Name Renewable Energy Market and Policy...

  7. National Policy Assurances to be Incorporated as Award Terms...

    Energy Savers [EERE]

    National Policy Assurances to be Incorporated as Award Terms National Policy Assurances to be Incorporated as Award Terms The following are the National Policy Assurances which are...

  8. Policy Flash 2013-77 Contractor Performance Information | Department...

    Energy Savers [EERE]

    Policy Flash 2013-77 Contractor Performance Information Policy Flash 2013-77 Contractor Performance Information Questions concerning this policy flash should be directed to Barbara...

  9. POLICY FLASH 2016-03 | Department of Energy

    Energy Savers [EERE]

    3 POLICY FLASH 2016-03 DATE: October 20, 2015 TO: Procurement DirectorsContracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office...

  10. Human Capital Policy Division (HC-11) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About Us Organization Policy, Accountability, and Technology (HC-10) Human Capital Policy Division (HC-11) Human Capital Policy Division (HC-11) Mission Statement This ...

  11. Small-Business Policy | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Suppliers Socioeconomic Programs Small-Business Policy Small-Business Policy It is the policy of the Y-12 National Security Complex to provide maximum practicable contracting...

  12. Office of Policy and International Affairs Organization Chart...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Office of Policy and International Affairs Organization Chart Office of Policy and International Affairs Organization Chart Office of Policy and International Affairs Organization...

  13. Demand Response and Smart Metering Policy Actions Since the Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Demand Response and Smart Metering Policy Actions Since the Energy Policy Act of 2005: A Summary for State Officials Demand Response and Smart Metering Policy Actions Since the ...

  14. Policy_Statement_on_Technology_Transfer.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PolicyStatementonTechnologyTransfer.pdf PolicyStatementonTechnologyTransfer.pdf PDF icon PolicyStatementonTechnologyTransfer.pdf More Documents & Publications...

  15. OPAM Policy Acquisition Guides | Department of Energy

    Energy Savers [EERE]

    15 - Contracting by Negotiation OPAM Policy Acquisition Guides DOE Princeton Plasma Physics Laboratory Purchase Power Agreement Request for Proposal

  16. NNSA Policies | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    content / NNSA Policies NNSA Policies Review the various NNSA and Department of Energy policies for additional information. Website Policy Accessibility The U.S. Department of Energy is committed to providing access to our Web pages for individuals with disabilities. To meet this commitment, this site is built to comply with the requirements of Section 508 of the Rehabilitation Act. Section 508 requires that individuals with disabilities, who are members of the public seeking information or

  17. E-Commerce Policies for Hq

    Broader source: Energy.gov [DOE]

    HQ Procurement Services Policies & Operating Proceduresfor Program Office Buyers Use of the Strategic Integrated Procurement Enterprise System (STRIPES)...

  18. Policies and Programs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Policies and Programs Policies and Programs State, local, and tribal governments and K-12 schools can advance clean energy goals through a variety of policies and programs designed and implemented to maximize effectiveness within organizations and throughout jurisdictions. Energy Efficiency Image of a washing machine. Energy efficiency policies and programs help drive the implementation of projects that reduce energy use. Examples include appliance standards, building energy codes, commissioning

  19. Implementation of Safeguards and Security Policy Panels

    Office of Environmental Management (EM)

    5,2008 MEMORANDUM FOR DISTRIBUTION FROM URITY OFFICER AND SECURITY SUBJECT: Implementation of Safeguards and Security Policy Panels The Office of Health, Safety and Security (HSS) recognizes the importance of well- conceived strategies and policies to support and communicate the security posture of the Department. In order for our security policies to properly reflect and enable Department of Energy corporate strategies, early and frequent communication between policy makers and end users is

  20. Geothermal Exploration Policy Mechanisms | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Exploration Policy Mechanisms Geothermal Exploration Policy Mechanisms This report focuses on five of the policy types that are most relevant to the U.S. market and political context for the exploration and confirmation of conventional hydrothermal (geothermal) resources in the United States: (1) drilling failure insurance, (2) loan guarantees, (3) subsidized loans, (4) capital subsidies, and (5) government-led exploration. It describes each policy type and its application in other countries and

  1. HQ EMS Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EMS Policy HQ EMS Policy Office of Administration Environmental Management System (EMS) Policy for Managing Department of Energy HQ Facilities This policy statement sets forth the commitments and basic structure of the Department of Energy (DOE) Headquarters Facility Environmental Management System (EMS). The scope of this EMS includes facility operations and support activities for the DOE Forrestal facility in Washington, DC and the Germantown facility in Germantown, Maryland. The DOE

  2. Nuclear Structure at the Limits

    SciTech Connect (OSTI)

    Nazarewicz, W.

    1998-01-12

    One of the frontiers of today?s nuclear science is the ?journey to the limits? of atomic charge and nuclear mass, of neutron-to-proton ratio, and of angular momentum. The tour to the limits is not only a quest for new, exciting phenomena, but the new data are expected, as well, to bring qualitatively new information about the fundamental properties of the nucleonic many-body system, the nature of the nuclear interaction, and nucleonic correlations at various energy-distance scales. In this series of lectures, current developments in nuclear structure at the limits are discussed from a theoretical perspective, mainly concentrating on medium-mass and heavy nuclei.

  3. Nuclear Structure at the Limits

    SciTech Connect (OSTI)

    Nazarewicz, Witold

    1997-12-31

    One of the frontiers of today`s nuclear science is the ``journey to the limits``: of atomic charge and nuclear mass, of neutron-to-proton ratio, and of angular momentum. The tour to the limits is not only a quest for new, exciting phenomena but the new data are expected, as well, to bring qualitatively new information about the fundamental properties of the nucleonic many-body system, the nature of the nuclear interaction, and nucleonic correlations at various energy-distance scales. In this talk, current developments in nuclear structure at the limits are discussed from a theoretical perspective.

  4. Dose Limits | Department of Energy

    Office of Environmental Management (EM)

    Limits Dose Limits (Question Posted to ERAD in May 2012) Who do you define as a member of the public for the onsite MEI? This question implies that there may be more than one maximally exposed individual (MEI), one on-site and one off-site, when demonstrating compliance with the Public Dose Limit of DOE Order 458.1. Although all potential MEIs should be considered and documented, as well as the calculated doses and pathways considered, the intent of DOE Order 458.1 is in fact to ultimately

  5. State Policies Provide Critical Support for Renewable Electricity

    SciTech Connect (OSTI)

    Barbose, Galen; Wiser, Ryan; Bolinger, Mark

    2008-07-15

    Growth in renewable energy in the U.S. over the past decade has been propelled by a number of forces, including rising fossil fuel prices, environmental concerns, and policy support at the state and federal levels. In this article, we review and discuss what are arguably the two most important types of state policies for supporting electricity generation from geothermal and other forms of renewable energy: renewables portfolio standards and utility integrated resource planning requirements. Within the Western U.S., where the vast majority of the nation's readily-accessible geothermal resource potential resides, these two types of state policies have been critical to the growth of renewable energy, and both promise to continue to play a fundamental role for the foreseeable future. In its essence, a renewables portfolio standard (RPS) requires utilities and other retail electricity suppliers to produce or purchase a minimum quantity or percentage of their generation supply from renewable resources. RPS purchase obligations generally increase over time, and retail suppliers typically must demonstrate compliance on an annual basis. Mandatory RPS policies are backed by various types of compliance enforcement mechanisms, although most states have incorporated some type of cost-containment provision, such as a cost cap or a cap on retail rate impacts, which could conceivably allow utilities to avoid (full) compliance with their RPS target. Currently, 27 states and the District of Columbia have mandatory RPS requirements. Within the eleven states of the contiguous Western U.S., all but three (Idaho, Utah, and Wyoming) now have a mandatory RPS legislation (Utah has a more-voluntary renewable energy goal), covering almost 80% of retail electricity sales in the region. Although many of these state policies have only recently been established, their impact is already evident: almost 1800 MW of new renewable capacity has been installed in Western states following the implementation of RPS policies. To date, wind energy has been the primary beneficiary of state RPS policies, representing approximately 83% of RPS-driven renewable capacity growth in the West through 2007. Geothermal energy occupies a distant second place, providing 7% of RPS-driven new renewable capacity in the West since the late 1990s, though geothermal's contribution on an energy (MWh) basis is higher. Looking to the future, a sizable quantity of renewable capacity beyond pre-RPS levels will be needed to meet state RPS mandates: about 25,000 MW by 2025 within the Western U.S. Geothermal energy is beginning to provide an increasingly significant contribution, as evidenced by the spate of new projects recently announced to meet state RPS requirements. Most of this activity has been driven by the RPS policies in California and Nevada, where the Geothermal Energy Association has identified 47 new geothermal projects, totaling more than 2,100 MW, in various stages of development. Additional geothermal projects in Arizona, New Mexico, Oregon, and Washington are also under development to meet those states RPS requirements. The other major state policy driver for renewable electricity growth, particularly in the West, is integrated resource planning (IRP). IRP was first formalized as a practice in the 1980s, but the practice was suspended in some states as electricity restructuring efforts began. A renewed interest in IRP has emerged in the past several years, however, with several Western states (California, Montana, and New Mexico) reestablishing IRP and others developing new rules to strengthen their existing processes. In its barest form, IRP simply requires that utilities periodically submit long-term resource procurement plans in which they evaluate alternative strategies for meeting their resource needs over the following ten to twenty years. However, many states have developed specific requirements for the IRP process that directly or indirectly support renewable energy. The most general of these is an explicit requirement that utilities evaluate renewables, and that

  6. DOE Purchase Card Policy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Purchase Card Policy DOE Purchase Card Policy Purchase Card Policies for Hq File epp-training-P-Card.pptx File Sustainable Acquisition Training for Purchase Cardholders and Approving.pptx More Documents & Publications Microsoft PowerPoint - ShanasBioSlides121307 Webinar: Bioproducts in the Federal Bioeconomy Portfolio Webinar Federal Biomass Activities

  7. Policy and Analysis Publications | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications Policy and Analysis Publications Policy and Analysis conducts cross-cutting and portfolio-based analyses of EERE technologies and the interrelationships among technologies, markets and policies; and provides quantified impacts of EERE investments in clean energy technology innovation and deployment. For more energy data and analysis resources, visit OpenEI. Year Publication Type Keyword Publications List

  8. ARM Standards Policy Committee Report

    SciTech Connect (OSTI)

    Cialella, A; Jensen, M; Koontz, A; McFarlane, S; McCoy, R; Monroe, J; Palanisamy, G; Perez, R; Sivaraman, C

    2012-09-19

    Data and metadata standards promote the consistent recording of information and are necessary to ensure the stability and high quality of Atmospheric Radiation Measurement (ARM) Climate Research Facility data products for scientific users. Standards also enable automated routines to be developed to examine data, which leads to more efficient operations and assessment of data quality. Although ARM Infrastructure agrees on the utility of data and metadata standards, there is significant confusion over the existing standards and the process for allowing the release of new data products with exceptions to the standards. The ARM Standards Policy Committee was initiated in March 2012 to develop a set of policies and best practices for ARM data and metadata standards.

  9. Plaxica Limited | Open Energy Information

    Open Energy Info (EERE)

    Zip: SW7 2AZ Product: UK-based technology company developing a new generation of polymers derived from sustainable resources. References: Plaxica Limited1 This article is a...

  10. Thermostatic/orifice trap reduces fuel, repair costs

    SciTech Connect (OSTI)

    Not Available

    1982-11-01

    This article is an evaluation of a steam trap that combines the continuous drain oriface with a thermostatically controlled trap oriface to efficiently remove condensate from virtually any steam system within its operating limits. This trap effectively reduces fuel and repair costs and has a capacity of 6000 il/hr, handles various pressures up to 600 psig, and operates against back pressures up to 90% of inlet pressure.

  11. Overview of Levelized Cost of Energy in the AEO

    Gasoline and Diesel Fuel Update (EIA)

    Presented to the EIA Energy Conference June 17, 2013 Chris Namovicz Assessing the Economic Value of New Utility-Scale Renewable Generation Projects Overview * Levelized cost of energy (LCOE) has been used by planners, analysts, policymakers, advocates and others to assess the economic competitiveness of technology options in the electric power sector * While of limited usefulness in the analysis of "conventional" utility systems, this approach is not generally appropriate when

  12. Technical Proposal Disclosure Policy - ITER

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proposal Disclosure Policy - ITER Pursuant to this solicitation, UT-Battelle will treat confidential proposal information as such and will disclose such information on a need to know basis to UT-Battelle employees and agents, DOE, and ITER- International Organization (ITER-IO) representatives for purposes of evaluation. It is hereby noted that any information distributed to ITER-IO will be of a technical nature; pricing information will not be distributed to ITER-IO.

  13. Coal Data Publication Revision Policy

    Gasoline and Diesel Fuel Update (EIA)

    Publication Revision Policy IF this occurs: THEN Survey Manager determines impact: WHAT happens next to the database and in our coal reports: Respondent provides data that are clearly incorrect or revised data for any period in the current reporting year. If National level percentage is > 1%, or If Regional level percentage is > 5%, or If State level percentage is > 10%. Quarterly Coal Report (QCR) and Quarterly Coal Distribution Report (QCDR) will be reposted no further back than the

  14. Policy | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Policy | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home /

  15. policy | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    policy | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Countering Nuclear Terrorism About Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Library Bios Congressional Testimony Fact Sheets Newsletters Press Releases Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home /

  16. Framework for SCADA Security Policy

    Office of Environmental Management (EM)

    Framework for SCADA Security Policy Dominique Kilman Jason Stamp dkilman@sandia.gov jestamp@sandia.gov Sandia National Laboratories Albuquerque, NM 87185-0785 Abstract - Modern automation systems used in infrastruc- ture (including Supervisory Control and Data Acquisition, or SCADA) have myriad security vulnerabilities. Many of these relate directly to inadequate security administration, which precludes truly effective and sustainable security. Adequate security management mandates a clear

  17. State of Ohio Approval Policy

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    STATE OF OHIO DIVISION OF STATE FIRE MARSHAL E 85 DISPENSER UTILIZATION APPROVAL POLICY When the Division of State Fire Marshal is involved in the approval process for a flammable/combustible liquid dispensing facility that utilizes E-blend, where a listed dispensing device is required by the state fire code and the proposed dispensing device is not specifically listed for the intended application, the following guidelines shall be followed in the approval process: As there are currently no

  18. Passive fault current limiting device

    DOE Patents [OSTI]

    Evans, D.J.; Cha, Y.S.

    1999-04-06

    A passive current limiting device and isolator is particularly adapted for use at high power levels for limiting excessive currents in a circuit in a fault condition such as an electrical short. The current limiting device comprises a magnetic core wound with two magnetically opposed, parallel connected coils of copper, a high temperature superconductor or other electrically conducting material, and a fault element connected in series with one of the coils. Under normal operating conditions, the magnetic flux density produced by the two coils cancel each other. Under a fault condition, the fault element is triggered to cause an imbalance in the magnetic flux density between the two coils which results in an increase in the impedance in the coils. While the fault element may be a separate current limiter, switch, fuse, bimetal strip or the like, it preferably is a superconductor current limiter conducting one-half of the current load compared to the same limiter wired to carry the total current of the circuit. The major voltage during a fault condition is in the coils wound on the common core in a preferred embodiment. 6 figs.

  19. Passive fault current limiting device

    DOE Patents [OSTI]

    Evans, Daniel J. (Wheeling, IL); Cha, Yung S. (Darien, IL)

    1999-01-01

    A passive current limiting device and isolator is particularly adapted for use at high power levels for limiting excessive currents in a circuit in a fault condition such as an electrical short. The current limiting device comprises a magnetic core wound with two magnetically opposed, parallel connected coils of copper, a high temperature superconductor or other electrically conducting material, and a fault element connected in series with one of the coils. Under normal operating conditions, the magnetic flux density produced by the two coils cancel each other. Under a fault condition, the fault element is triggered to cause an imbalance in the magnetic flux density between the two coils which results in an increase in the impedance in the coils. While the fault element may be a separate current limiter, switch, fuse, bimetal strip or the like, it preferably is a superconductor current limiter conducting one-half of the current load compared to the same limiter wired to carry the total current of the circuit. The major voltage during a fault condition is in the coils wound on the common core in a preferred embodiment.

  20. Market and Policy Barriers for Energy Storage Deployment

    Broader source: Energy.gov [DOE]

    Electric energy storage technologies can provide numerous grid services, there are a number of factors that restrict their current deployment. The most significant barrier to deployment is high capital costs, though several recent deployments indicate that capital costs are decreasing and energy storage may be the preferred economic alternative in certain situations. However, a number of other market and regulatory barriers persist, limiting further deployment. These barriers can be categorized into regulatory barriers, market (economic) barriers, utility and developer business model barriers, cross-cutting barriers and technology barriers.