  1. Light Water Reactor Sustainability Program - Integrated Program Plan |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Light Water Reactor Sustainability Program - Integrated Program Plan Light Water Reactor Sustainability Program - Integrated Program Plan The Light Water Reactor Sustainability (LWRS) Program is a research and development (R&D) program sponsored by the U. S. Department of Energy (DOE), performed in close collaboration and cooperation with related industry R&D programs. Light Water Reactor Sustainability Program - Integrated Program Plan - Revision 3 (2.66 MB)

  2. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect (OSTI)

    George Griffith; Robert Youngblood; Jeremy Busby; Bruce Hallbert; Cathy Barnard; Kathryn McCarthy

    2012-01-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline - even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy's Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans.

  3. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect (OSTI)

    McCarthy, Kathryn A.; Busby, Jeremy; Hallbert, Bruce; Bragg-Sitton, Shannon; Smith, Curtis; Barnard, Cathy

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  4. Light Water Reactor Sustainability Program Integrated Program Plan

    SciTech Connect (OSTI)

    Kathryn McCarthy; Jeremy Busby; Bruce Hallbert; Shannon Bragg-Sitton; Curtis Smith; Cathy Barnard

    2013-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.

  5. Light Water Reactor Sustainability Program - Integrated Program...

    Office of Environmental Management (EM)

    Program - Integrated Program Plan Light Water Reactor Sustainability Program - Integrated Program Plan The Light Water Reactor Sustainability (LWRS) Program is a research and ...

  6. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEP Program Planning Template ("Program Planning Template") SEP Program Planning Template ("Program Planning Template") Program Planning Template More Documents & Publications...

  7. Light Water Reactor Sustainability Program A Reference Plan for Control Room Modernization: Planning and Analysis Phase

    SciTech Connect (OSTI)

    Jacques Hugo; Ronald Boring; Lew Hanes; Kenneth Thomas

    2013-09-01

    The U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) program is collaborating with a U.S. nuclear utility to bring about a systematic fleet-wide control room modernization. To facilitate this upgrade, a new distributed control system (DCS) is being introduced into the control rooms of these plants. The DCS will upgrade the legacy plant process computer and emergency response facility information system. In addition, the DCS will replace an existing analog turbine control system with a display-based system. With technology upgrades comes the opportunity to improve the overall human-system interaction between the operators and the control room. To optimize operator performance, the LWRS Control Room Modernization research team followed a human-centered approach published by the U.S. Nuclear Regulatory Commission. NUREG-0711, Rev. 3, Human Factors Engineering Program Review Model (O’Hara et al., 2012), prescribes four phases for human factors engineering. This report provides examples of the first phase, Planning and Analysis. The three elements of Planning and Analysis in NUREG-0711 that are most crucial to initiating control room upgrades are: • Operating Experience Review: Identifies opportunities for improvement in the existing system and provides lessons learned from implemented systems. • Function Analysis and Allocation: Identifies which functions at the plant may be optimally handled by the DCS vs. the operators. • Task Analysis: Identifies how tasks might be optimized for the operators. Each of these elements is covered in a separate chapter. Examples are drawn from workshops with reactor operators that were conducted at the LWRS Human System Simulation Laboratory HSSL and at the respective plants. The findings in this report represent generalized accounts of more detailed proprietary reports produced for the utility for each plant. The goal of this LWRS report is to disseminate the technique and provide examples sufficient to

  8. Implementation Plan and Initial Development of Nuclear Concrete Materials Database for Light Water Reactor Sustainability Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The FY10 activities for development of a nuclear concrete materials database to support the Light Water Reactor Sustainability Program are summarized. The database will be designed and constructed...

  9. Light Water Reactor Sustainability Program: Reactor Safety Technologies Pathway Technical Program Plan

    SciTech Connect (OSTI)

    Corradini, M. L.

    2015-06-01

    “end user” of the results from this DOE-sponsored work. The response to the Fukushima accident has been global, and there is a continuing multinational interest in collaborations to better quantify accident consequences and to incorporate lessons learned from the accident. DOE will continue to seek opportunities to facilitate collaborations that are of value to the U.S. industry, particularly where the collaboration provides access to vital data from the accident or otherwise supports or leverages other important R&D work. The purpose of the Reactor Safety Technology R&D is to improve understanding of beyond design basis events and reduce uncertainty in severe accident progression, phenomenology, and outcomes using existing analytical codes and information gleaned from severe accidents, in particular the Fukushima Daiichi events. This information will be used to aid in developing mitigating strategies and improving severe accident management guidelines for the current light water reactor fleet.

  10. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    SciTech Connect (OSTI)

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will have passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.

  11. Light Water Reactor Sustainability Research and Development Program Plan -- Fiscal Year 2009–2013

    SciTech Connect (OSTI)

    Idaho National Laboratory

    2009-12-01

    Nuclear power has reliably and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. By the year 2030, domestic demand for electrical energy is expected to grow to levels of 16 to 36% higher than 2007 levels. At the same time, most currently operating nuclear power plants will begin reaching the end of their 60-year operating licenses. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary this year. U.S. regulators have begun considering extended operations of nuclear power plants and the research needed to support long-term operations. The Light Water Reactor Sustainability (LWRS) Research and Development (R&D) Program, developed and sponsored by the Department of Energy, is performed in close collaboration with industry R&D programs. The purpose of the LWRS R&D Program is to provide technical foundations for licensing and managing long-term, safe and economical operation of the current operating nuclear power plants. The LWRS R&D Program vision is captured in the following statements: Existing operating nuclear power plants will continue to safely provide clean and economic electricity well beyond their first license- extension period, significantly contributing to reduction of United States and global carbon emissions, enhancement of national energy security, and protection of the environment. There is a comprehensive technical basis for licensing and managing the long-term, safe, economical operation of nuclear power plants. Sustaining the existing operating U.S. fleet also will improve its international engagement

  12. RISMC advanced safety analysis working plan: FY2015 - FY2019. Light Water Reactor Sustainability Program

    SciTech Connect (OSTI)

    Szilard, Ronaldo H; Smith, Curtis L

    2014-09-01

    In this report, the Advanced Safety Analysis Program (ASAP) objectives and value proposition is described. ASAP focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. The set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. As part of the discussion, we have identified three sets of stakeholders, the nuclear industry, the Department of Energy (DOE), and associated oversight organizations. These three groups would benefit from ASAP in different ways. For example, within the DOE complex, the possible applications that are seen include the safety of experimental reactors, facility life extension, safety-by-design in future generation advanced reactors, and managing security for the storage of nuclear material. This report provides information in five areas: (1) A value proposition (“why is this important?”) that will make the case for stakeholder’s use of the ASAP research and development (R&D) products; (2) An identification of likely end users and pathway to adoption of enhanced tools by the end-users; (3) A proposed set of practical and achievable “use case” demonstrations; (4) A proposed plan to address ASAP verification and validation (V&V) needs; and (5) A proposed schedule for the multi-year ASAP.

  13. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Program Planning Template More Documents & Publications Commute Mode Switching Impact Tool Energy Intensity Indicators Data Refrigerator-Freezers (multiple defrost waiver)...

  14. Multi-Year Program Plan FY'09-FY'15 Solid-State Lighting Research and Development

    SciTech Connect (OSTI)

    2009-03-01

    President Obama's energy and environment agenda calls for deployment of 'the Cheapest, Cleanest, Fastest Energy Source - Energy Efficiency.' The Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE) plays a critical role in advancing the President's agenda by helping the United States advance toward an energy-efficient future. Lighting in the United States is projected to consume nearly 10 quads of primary energy by 2012.3 A nation-wide move toward solid-state lighting (SSL) for general illumination could save a total of 32.5 quads of primary energy between 2012 and 2027. No other lighting technology offers the DOE and our nation so much potential to save energy and enhance the quality of our built environment. The DOE has set forth the following mission statement for the SSL R&D Portfolio: Guided by a Government-industry partnership, the mission is to create a new, U.S.-led market for high-efficiency, general illumination products through the advancement of semiconductor technologies, to save energy, reduce costs and enhance the quality of the lighted environment.

  15. OREM Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Oak Ridge Office of Environmental Management's Program Plan discusses the vision, goals, and strategy for 2014-2024.

  16. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory-Directed Research and Development Program FY2016 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2016 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including

  17. Light water reactor program

    SciTech Connect (OSTI)

    Franks, S.M.

    1994-12-31

    The US Department of Energy`s Light Water Reactor Program is outlined. The scope of the program consists of: design certification of evolutionary plants; design, development, and design certification of simplified passive plants; first-of-a-kind engineering to achieve commercial standardization; plant lifetime improvement; and advanced reactor severe accident program. These program activities of the Office of Nuclear Energy are discussed.

  18. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2015 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  19. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2014 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  20. LIGHT WATER REACTOR SUSTAINABILITY PROGRAM ADVANCED INSTRUMENTATION, INFORMATION, AND CONTROL SYSTEMS TECHNOLOGIES TECHNICAL PROGRAM PLAN FOR 2013

    SciTech Connect (OSTI)

    Hallbert, Bruce; Thomas, Ken

    2014-07-01

    Reliable instrumentation, information, and control (II&C) systems technologies are essential to ensuring safe and efficient operation of the U.S. light water reactor (LWR) fleet. These technologies affect every aspect of nuclear power plant (NPP) and balance-of-plant operations. In 1997, the National Research Council conducted a study concerning the challenges involved in modernization of digital instrumentation and control systems in NPPs. Their findings identified the need for new II&C technology integration.

  1. Light Water Reactor Sustainability Program Advanced Instrumentation, Information, and Control Systems Technologies Technical Program Plan for 2013

    SciTech Connect (OSTI)

    Hallbert, Bruce; Thomas, Ken

    2014-09-01

    Reliable instrumentation, information, and control (II&C) systems technologies are essential to ensuring safe and efficient operation of the U.S. light water reactor (LWR) fleet. These technologies affect every aspect of nuclear power plant (NPP) and balance-of-plant operations. In 1997, the National Research Council conducted a study concerning the challenges involved in modernization of digital instrumentation and control systems in NPPs. Their findings identified the need for new II&C technology integration.

  2. Financing Guidance for LED Street Lighting Programs

    Broader source: Energy.gov [DOE]

    Financing an LED street lighting replacement program can present a hurdle for many system owners, even if the planned transition offers very favorable economics. Replacing the existing system requires a significant budget, particularly as the scope of the program increases. Cities such as Los Angeles and Seattle have invested many millions of dollars into their (very successful) LED street lighting replacement programs.

  3. Green lights program in China

    SciTech Connect (OSTI)

    Dadi, Zhuo; Hong, Liu

    1996-12-31

    In China`s 9th 5-year plan (1996-2000), the Chinese government has placed high priority on energy conservation. The China Green Lights Program (CGLP) is listed as one of the key projects of energy conservation. The basic strategy of the CGLP is to mobilise all of the potential contributors to participate in the program, and to use market signals and supplementary non-market instruments to facilitate its implementation. Governmental funds and loans will be used as seed money to attract private participation in the program. The program contains the following elements: (1) Information dissemination to educate the public on the economic and other values of the program and to provide CGLP information to increase consumer awareness and, as a result, increase the demand for energy-efficient lighting systems. (2) Development of standards and codes for lighting systems, establishment of product specifications, and enforcement of product standards. (3) Development of quality certification and labelling system to provide assurances to consumers that the products they are purchasing will meet their performance and cost saving expectations. (4) Highlighted support and financing for production technology development and production capacity expansion. (5) Demonstration and pilot projects to boost consumer confidence in green lighting systems and to demonstrate new production technologies and processes. (6) International co-operation to expand the international exchange and absorb advanced technology and experience for implementation of the China Green Lights Program.

  4. Light Water Reactor Sustainability Program Risk-Informed Safety Margins Characterization (RISMC) PathwayTechnical Program Plan

    SciTech Connect (OSTI)

    Curtis Smith; Cristian Rabiti; Richard Martineau

    2012-11-01

    Safety is central to the design, licensing, operation, and economics of Nuclear Power Plants (NPPs). As the current Light Water Reactor (LWR) NPPs age beyond 60 years, there are possibilities for increased frequency of Systems, Structures, and Components (SSCs) degradations or failures that initiate safety-significant events, reduce existing accident mitigation capabilities, or create new failure modes. Plant designers commonly over-design portions of NPPs and provide robustness in the form of redundant and diverse engineered safety features to ensure that, even in the case of well-beyond design basis scenarios, public health and safety will be protected with a very high degree of assurance. This form of defense-in-depth is a reasoned response to uncertainties and is often referred to generically as safety margin. Historically, specific safety margin provisions have been formulated, primarily based on engineering judgment.

  5. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DECEMBER 2014 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER ... within the context of an integrated system of capture, transport, and storage ...

  6. Light Water Reactor Sustainability Program: Materials Aging and...

    Office of Environmental Management (EM)

    Program: Materials Aging and Degradation Technical Program Plan Light Water Reactor ... Primary water stress corrosion cracking (PWSCC) is one key form of degradation in extended ...

  7. Solid-State Lighting 2016 R&D Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Solid-State Lighting (SSL) R&D Plan is a consolidation of the Department of Energy (DOE) SSL Multi-Year Program Plan (MYPP) and the DOE SSL Manufacturing R&D Roadmap that DOE has...

  8. SSL R&D Multi-Year Program Plan

    Energy Savers [EERE]

    Lighting Research and Development Multi-Year Program Plan April 2013 Prepared for: Lighting Research and Development Building Technologies Office Office of Energy Efficiency and ...

  9. Light Water Reactor Sustainability (LWRS) Program | Department...

    Energy Savers [EERE]

    Nuclear Reactor Technologies Light Water Reactor Sustainability (LWRS) Program Light Water Reactor Sustainability (LWRS) Program Light Water Reactor Sustainability (LWRS) ...

  10. Program Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications » Program Plans Program Plans This page contains summaries of planned activities for DOE's Fuel Cell Technologies Office. The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Office and the DOE offices of Nuclear Energy, Fossil Energy, and Science. It describes the Program's activities, the specific

  11. ESnet Program Plan 1994

    SciTech Connect (OSTI)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  12. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that

  13. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CARBON CAPTURE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its

  14. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents

  15. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use

  16. Programs Planning to Do Evaluations

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Programs Planning to Do Evaluations, Call Slides and Discussion Summary, August 2, 2012.

  17. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  18. TWRS safety program plan

    SciTech Connect (OSTI)

    Calderon, L.M., Westinghouse Hanford

    1996-08-01

    Management of Nuclear Safety, Industrial Safety, Industrial Hygiene, and Fire Protection programs, functions, and field support resources for Tank Waste Remediation Systems (TWRS) has, until recently, been centralized in TWRS Safety, under the Emergency, Safety, and Quality organization. Industrial hygiene technician services were also provided to support operational needs related to safety basis compliance. Due to WHC decentralization of safety and reengineering efforts in West Tank Farms, staffing and safety responsibilities have been transferred to the facilities. Under the new structure, safety personnel for TWRS are assigned directly to East Tank Farms, West Tank Farms, and a core Safety Group in TWRS Engineering. The Characterization Project Operations (CPO) safety organization will remain in tact as it currently exists. Personnel assigned to East Tank Farms, West Tank Farms, and CPO will perform facility-specific or project-specific duties and provide field implementation of programs. Those assigned to the core group will focus on activities having a TWRS-wide or programmatic focus. Hanford-wide activities will be the responsibility of the Safety Center of Expertise. In order to ensure an effective and consistent safety program for TWRS under the new organization program functions, goals, organizational structure, roles, responsibilities, and path forward must be clearly established. The purpose of the TWRS Safety Program Plan is to define the overall safety program, responsibilities, relationships, and communication linkages for safety personnel under the new structure. In addition, issues associated with reorganization transition are addressed, including training, project ownership, records management, and dissemination of equipment. For the purpose of this document ``TWRS Safety`` refers to all safety professionals and technicians (Industrial Safety, Industrial Hygiene, Fire Protection, and Nuclear Safety) within the TWRS organization, regardless of their

  19. Program Planning Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning Guide Program Planning Guide SEP program planning guide.pdf More Documents & Publications SEP Presentations Materials SEP Toolkit Overview The Cummins Rocky Mount...

  20. LDRD FY 2014 Program Plan

    SciTech Connect (OSTI)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  1. Lakeview Light and Power- Commercial Lighting Rebate Program

    Broader source: Energy.gov [DOE]

    Lakeview Light and Power offers a commercial lighting rebate program. Rebates apply to the installation of energy efficient lighting retrofits in non-residential buildings. The rebate program is...

  2. Program Plan | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Plan Revised Program Plan approval is pending, new program direction concepts are described in a 3-pager, here. 151124 REMS Slides

  3. Caterpillar Light Truck Clean Diesel Program

    SciTech Connect (OSTI)

    Robert L. Miller; Kevin P. Duffy; Michael A. Flinn; Steve A. Faulkner; Mike A. Graham

    1999-04-26

    In 1998, light trucks accounted for over 48% of new vehicle sales in the U.S. and well over half the new Light Duty vehicle fuel consumption. The Light Truck Clean Diesel (LTCD) program seeks to introduce large numbers of advanced technology diesel engines in light-duty trucks that would improve their fuel economy (mpg) by at least 50% and reduce our nation's dependence on foreign oil. Incorporating diesel engines in this application represents a high-risk technical and economic challenge. To meet the challenge, a government-industry partnership (Department of Energy, diesel engine manufacturers, and the automotive original equipment manufacturers) is applying joint resources to meet specific goals that will provide benefits to the nation. [1] Caterpillar initially teamed with Ford Motor Company on a 5 year program (1997-2002) to develop prototype vehicles that demonstrate a 50% fuel economy improvement over the current 1997 gasoline powered light truck vehicle in this class while complying with EPA's Tier II emissions regulations. The light truck vehicle selected for the demonstration is a 1999 Ford F150 SuperCab. To meet the goals of the program, the 4.6 L V-8 gasoline engine in this vehicle will be replaced by an advanced compression ignition direct injection (CIDI) engine. Key elements of the Caterpillar LTCD program plan to develop the advanced CIDI engine are presented in this paper.

  4. New Production Reactors Program Plan

    SciTech Connect (OSTI)

    Not Available

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  5. Fiscal year 1987 program plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  6. Peninsula Light Company- Commercial Efficient Lighting Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Peninsula Light Company (PLC) offers a rebate program for commercial customers who wish to upgrade to energy efficient lighting. Participating customers must be served by PLC commercial service....

  7. Energy Star Lighting Verification Program (Program for the Evaluation...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Energy Star Lighting Verification Program (Program for the Evaluation and Analysis of Residential Lighting) Citation Details In-Document Search Title: Energy Star ...

  8. Solid-State Lighting 2015 R&D Plan | Department of Energy

    Energy Savers [EERE]

    2015 R&D Plan Solid-State Lighting 2015 R&D Plan The Solid-State Lighting (SSL) R&D Plan is a consolidation of the Department of Energy (DOE) SSL Multi-Year Program Plan (MYPP) and ...

  9. DOE-NE Light Water Reactor Sustainability Program and EPRI Long...

    Office of Environmental Management (EM)

    DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program - Joint Research and Development Plan DOE-NE Light Water Reactor Sustainability Program and ...

  10. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Annual Report Thomas Jefferson National Accelerator Facility Newport News, Virginia (This page intentionally left blank) 2014 LDRD Annual Report APPROVALS __________________________________10/21/14 Hugh E. Montgomery Date Director Thomas Jefferson National Accelerator Facility __________________________________10/20/14 Lawrence S. Cardman Date LDRD Program Manager Thomas Jefferson National Accelerator Facility Published By: Thomas Jefferson National Accelerator Facility 12000 Jefferson Ave.

  11. LFRG Program Management Plan (LFRG PMP)

    Office of Environmental Management (EM)

    LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN SEPTEMBER 18, 2000 LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN Jay ...

  12. Bonneville Power Administration Program Specific Recovery Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration Program Specific Recovery Plan Bonneville Power Administration Program Specific Recovery Plan PDF icon Microsoft Word - PSRP May 15 2009 BPA ...

  13. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Annual Report Thomas Jefferson National Accelerator Facility Newport News, Virginia (This page intentionally left blank) APPROVALS _ 10/25/15 Hugh E. Montgomery Date Director Thomas Jefferson National Accelerator Facility _ 10/25/15 Lawrence S. Cardman Date LDRD Program Manager Thomas Jefferson National Accelerator Facility Published By: Thomas Jefferson National Accelerator Facility 12000 Jefferson Ave. Newport News, VA 23606 This document and the material and data contained herein were

  14. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  15. Solid-State Lighting Program Strategy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    James R. Brodrick, Ph.D. April 22, 2014 U.S. Department of Energy Solid-State Lighting Program Strategy MARKET * Many companies * Semiconductors :: Lighting * Large business ...

  16. OTEC- Commercial Lighting Retrofit Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Oregon Trail Electric Consumers Cooperative (OTEC) offers a commercial lighting retrofit program that provides rebates for commercial businesses that change existing lighting to more energy...

  17. Indianapolis Power & Light- Business Energy Incentives Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Indiana Power and Light Business (IPL) Energy Incentives Program assists commercial and industrial customers with reducing energy consumption through three common types of equipment: lighting,...

  18. Site Support Program Plan Infrastructure Program

    SciTech Connect (OSTI)

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  19. CEBAF - environmental protection program plan

    SciTech Connect (OSTI)

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  20. Light duty utility arm startup plan

    SciTech Connect (OSTI)

    Barnes, G.A.

    1998-09-01

    This plan details the methods and procedures necessary to ensure a safe transition in the operation of the Light Duty Utility Arm (LDUA) System. The steps identified here outline the work scope and identify responsibilities to complete startup, and turnover of the LDUA to Characterization Project Operations (CPO).

  1. Atmospheric Radiation Measurement Program Science Plan. Current...

    Office of Scientific and Technical Information (OSTI)

    Program Science Plan. Current Status and Future Directions of the ARM Science Program Citation Details In-Document Search Title: Atmospheric Radiation Measurement Program Science ...

  2. TWRS Configuration management program plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  3. Solid Waste Management Program Plan

    SciTech Connect (OSTI)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  4. Program Plan | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Coal and Coal-Biomass to Liquids Program Plan Revised Program Plan approval is pending, new program direction concepts are described in a 3-pager, here. 151124 REMS Slides

  5. SSL R&D Multi-Year Program Plan | Department of Energy

    Energy Savers [EERE]

    The U.S. DOE Solid-State Lighting Research and Development Multi-Year Program Plan. sslmypp2013web.pdf (1.07 MB) More Documents & Publications Solid-State Lighting 2015 R&D Plan ...

  6. LFRG Program Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Plan LFRG Program Management Plan The purpose of the EM Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes, and the transition from DOE Order 5820.2A to DOE Order 435.1. LFRG Program Management Plan (LFRG PMP) (185.11 KB) More Documents & Publications LFRG Execution Plan Low-Level Waste Disposal Facility Federal Review Group Manual LFRG Charter

  7. Data Management Facility Operations Plan (Program Document) ...

    Office of Scientific and Technical Information (OSTI)

    Program Document: Data Management Facility Operations Plan Citation Details In-Document Search Title: Data Management Facility Operations Plan The Data Management Facility (DMF) is ...

  8. Multi-Year Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy’s Building Technologies Office’s (BTO’s) Multi-Year Program Plan (MYPP) for Fiscal Years 2016-2020 provides a broad overview of the energy use in the buildings sector, the opportunities for cost-effective energy savings, the barriers to their achievement, and BTO’s strategies and goals for achieving significant reductions in building energy use intensity.

  9. Doing Business with DOE's Solid-State Lighting Program | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Doing Business with DOE's Solid-State Lighting Program Doing Business with DOE's Solid-State Lighting Program 2014 DOE Solid-State Lighting Program Fact Sheet doingbusinessfactshe...

  10. Atmospheric Radiation Measurement Program Science Plan. Current...

    Office of Scientific and Technical Information (OSTI)

    Radiation Measurement Program Science Plan. Current Status and Future Directions of the ARM Science Program Citation Details In-Document Search Title: Atmospheric Radiation ...

  11. Monitoring Plan for Weatherization Assistance Program, State...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WPN 16-4: Weatherization Assistance Program Monitoring Guidance WPN 12-5: Updated Weatherization Assistance Program Monitoring Guidance WAP Memorandum 010: Quality Management Plan ...

  12. Program Evaluation: Strategic Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Why, What, & When to Evaluate » Program Evaluation: Strategic Planning Program Evaluation: Strategic Planning One way to have useful and cost-effective evaluations is to strategically plan evaluation activity so it supports management activity cycles for planning, budgeting, analysis, program implementation, and benefits reporting and communication. In this way, evaluations generate information to feed into critical decision processes and continuous improvement. Planning evaluations

  13. Multiyear Program Plan Template - Phase II Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multi-Year Program Plan Guidance and Template Page For questions or help, contact the PM Help Desk at PMHelpDesk @ee.doe.gov EERE Multi- Year Program Plan Guidance and Template July 2016 Prepared by the Project Management Coordination Office (PMCO) EERE Multi-Year Program Plan Guidance and Template Page i For questions or help, contact the PM Help Desk at PMHelpDesk @ee.doe.gov Table of Contents Part I - Multi-Year Program Plan (MYPP)

  14. Environmental Restoration Quality Program Plan

    SciTech Connect (OSTI)

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a entral Environmental Restoration Division'' to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization's objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  15. DOE Solid-State Lighting Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 16, 2015 U.S. Department of Energy DOE Solid-State Lighting Program 2 DOE Solid-State Lighting Program Mission and Goal By 2025, develop advanced SSL technologies that - compared to conventional lighting technologies - are much more energy efficient, longer lasting, and cost competitive, by targeting a product system efficiency of 50 percent with lighting that accurately reproduces sunlight spectrum. Guided by a government-industry partnership, DOE's mission is to create a new, U.S.-led

  16. Environmental Restoration Information Resource Management Program Plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  17. Flathead Electric Cooperative- Commercial Lighting Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Flathead Electric Cooperative, in conjunction with Bonneville Power Administration, encourages energy efficiency in the commercial sector by providing a commercial lighting retro-fit rebate program...

  18. Water Power Program: Program Plans, Implementation, and Results

    Energy Savers [EERE]

    Water Power Program HOME ABOUT RESEARCH & DEVELOPMENT FINANCIAL OPPORTUNITIES INFORMATION RESOURCES NEWS EVENTS EERE Water Power Program About Key Activities Plans,...

  19. Building Technologies Program: Planned Program Activities for 2008-2012

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Complete Multi-Year Program Plan 2008 includes all sections - overview, research and development, standards, technology validation, portfolio management, appendices.

  20. LLNL Waste Minimization Program Plan

    SciTech Connect (OSTI)

    Not Available

    1990-02-14

    This document is the February 14, 1990 version of the LLNL Waste Minimization Program Plan (WMPP). The Waste Minimization Policy field has undergone continuous changes since its formal inception in the 1984 HSWA legislation. The first LLNL WMPP, Revision A, is dated March 1985. A series of informal revision were made on approximately a semi-annual basis. This Revision 2 is the third formal issuance of the WMPP document. EPA has issued a proposed new policy statement on source reduction and recycling. This policy reflects a preventative strategy to reduce or eliminate the generation of environmentally-harmful pollutants which may be released to the air, land surface, water, or ground water. In accordance with this new policy new guidance to hazardous waste generators on the elements of a Waste Minimization Program was issued. In response to these policies, DOE has revised and issued implementation guidance for DOE Order 5400.1, Waste Minimization Plan and Waste Reduction reporting of DOE Hazardous, Radioactive, and Radioactive Mixed Wastes, final draft January 1990. This WMPP is formatted to meet the current DOE guidance outlines. The current WMPP will be revised to reflect all of these proposed changes when guidelines are established. Updates, changes and revisions to the overall LLNL WMPP will be made as appropriate to reflect ever-changing regulatory requirements. 3 figs., 4 tabs.

  1. Wind Program: Program Plans, Implementation, and Results

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Learn more about this EERE Office. Plans Discover the plans, budgets, and analyses that set the direction of office priorities and activities. Implementation Find out how the...

  2. HUD Choice Neighborhoods Planning Grants Program

    Broader source: Energy.gov [DOE]

    The U.S. Department of Housing and Urban Development (HUD) is accepting applications for the Choice Neighborhoods Planning Grant Program to leverage investments in public schools and education programs, early learning programs and services, and improved access to jobs.

  3. Multiyear Program Plan Template - Phase II Guidance | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multiyear Program Plan Template - Phase II Guidance Multiyear Program Plan Template - Phase II Guidance EERE template and guidance for program managers to develop multiyear plans, ...

  4. Multi-Year Program Plan - Building Regulatory Programs

    SciTech Connect (OSTI)

    2010-10-01

    This document presents DOEs multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOEs 5-year plan for moving forward.

  5. Multi-Year Program Plan - Building Regulatory Programs

    SciTech Connect (OSTI)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  6. Disposal phase experimental program plan

    SciTech Connect (OSTI)

    1997-01-31

    The Waste Isolation Pilot Plant (WIPP) facility comprises surface and subsurface facilities, including a repository mined in a bedded salt formation at a depth of 2,150 feet. It has been developed to safely and permanently isolate transuranic (TRU) radioactive wastes in a deep geological disposal site. On April 12, 1996, the DOE submitted a revised Resource Conservation and Recovery Act (RCRA) Part B permit application to the New Mexico Environment Department (NMED). The DOE anticipates receiving an operating permit from the NMED; this permit is required prior to the start of disposal operations. On October 29, 1996, the DOE submitted a Compliance Certification Application (CCA) to the US Environmental Protection Agency (EPA) in accordance with the WIPP land Withdrawal Act (LWA) of 1992 (Public Law 102-579) as amended, and the requirements of Title 40 of the Code of Federal Regulations (40 CFR) Parts 191 and 194. The DOE plans to begin disposal operations at the WIPP in November 1997 following receipt of certification by the EPA. The disposal phase is expected to last for 35 years, and will include recertification activities no less than once every five years. This Disposal Phase Experimental Program (DPEP) Plan outlines the experimental program to be conducted during the first 5-year recertification period. It also forms the basis for longer-term activities to be carried out throughout the 35-year disposal phase. Once the WIPP has been shown to be in compliance with regulatory requirements, the disposal phase gives an opportunity to affirm the compliance status of the WIPP, enhance the operations of the WIPP and the national TRU system, and contribute to the resolution of national and international nuclear waste management technical needs. The WIPP is the first facility of its kind in the world. As such, it provides a unique opportunity to advance the technical state of the art for permanent disposal of long-lived radioactive wastes.

  7. Building Technologies Program Planning Summary

    Energy Savers [EERE]

    of commercially available but underutilized technologies, lighting controls, expert lighting design, and integrated systems. * Through the EnergySmart Schools subprogram, BTP...

  8. Total quality management program planning

    SciTech Connect (OSTI)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  9. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  10. Solid-State Lighting Program Strategy Overview - 2014 BTO Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Strategy Overview - 2014 BTO Peer Review Solid-State Lighting Program Strategy ... of the Building Technologies Office's Solid-State Lighting Program Strategy activities. ...

  11. Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1993-06-01

    The Quality Assurance Project Plan (QAPP) is intended to document the quality assurance of the Environmental Monitoring Program. The Quality Assurance Project Plan has two parts and is written to become a chapter in the Environmental Monitoring Plan. Part A describes the management responsibilities and activities performed to assure the quality of the Environmental Monitoring Program. Part B covers the documentation requirements for changes in the Monitoring Program, and provides details on control of the design and implementation of quality assurance activities.

  12. Multiyear Program Plan Template - Phase II Guidance

    Office of Environmental Management (EM)

    ... One way to have useful and cost effective evaluations is to have an evaluation strategy ... processes such as planning, budgeting, program implementation, and benefits estimation. ...

  13. Energy Storage Program Planning Document (2011) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    PDF icon Energy Storage Program Planning Document (2011) More Documents & Publications Progress in Grid Scale Flow Batteries Energy Storage Systems 2014 Peer Review Presentations - ...

  14. Program Execution Plan Mission Support Organizations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section 7.5, for a description of this system). 14 * Improvements Database * Lessons Learned database Several program and plans have been developed to describe how elements of...

  15. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    Establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Cancels: DOE N 473.9 and DOE M 470.1-1

  16. Monitoring Plan for Weatherization Assistance Program, State Energy Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Energy Efficiency and Conservation Block Grants | Department of Energy Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Appendix of Compliance Checklists appendix_compliance_checklists_102210.pdf (535.66 KB) More Documents & Publications WPN 16-4: Weatherization Assistance Program

  17. The light meson spectroscopy program

    SciTech Connect (OSTI)

    Smith, Elton S.

    2014-06-01

    Recent discoveries of a number of unexpected new charmomium-like meson states at the BaBar and Belle B-factories have demonstrated how little is still known about meson spectroscopy. In this talk we will review recent highlights of the light quark spectroscopy from collider and fixed target experiments.

  18. Garland Power and Light- Solar Rebate Program

    Broader source: Energy.gov [DOE]

    A utility bill credit is available to encourage Garland Power and Light (GP&L) customers to install solar photovoltaic panels that meet the minimum requirements of the program. Please check the...

  19. Lighting program design: New opportunities for profits

    SciTech Connect (OSTI)

    Johnson, J.A.; Jones, C.C.

    1995-03-01

    The increased activity by State`s to adopt codes and standards is creating new challenges for the design and implementation of lighting programs for commercial new construction. The regulatory environment is also requiring that transaction costs are minimized for these programs. Recent work done by the Illuminating Engineers Society for the new ASHRA-E/IES Standard 90.1-1989R provides a new technical basis for the development of component based lighting programs. Component based programs offer advantages over design assistance programs. They include the ease of marketing, higher market penetration rate, and the promotion of specific cost-effective technologies. The proposed approach also overcomes problems with current component based programs including defining the baseline, free ridership, and difficulties in performing impact evaluations. By addressing these problems, lighting programs for new buildings will continue to be one of the most cost-effective new construction programs for most utilities. The basic concept is to combine two activities that are shaping the national energy picture into a program design strategy. The national activities are the Energy Policy Act of 1992 and the development of the next generation of ASHRAE/IES Standard 90.1. The approach uses the prescriptive criteria in Standard 90.1 to develop savings thresholds for program participation. The savings thresholds are then associated with lighting component technologies to determine eligibility criteria for each component. Combining the prescriptive criteria with component savings is the key to the approach.

  20. LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan LWRS Program and EPRI Long-Term Operations Program - Joint R&D Plan To address the challenges associated with pursuing commercial nuclear power plant operations beyond 60 years, the U.S. Department of Energy's (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs: DOE-NE's Light Water

  1. Programs Planning to Do Evaluations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Programs Planning to Do Evaluations Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Programs Planning to Do Evaluations, Call Slides and Discussion ...

  2. Light duty utility arm startup plan

    SciTech Connect (OSTI)

    Barnes, G.A.

    1998-03-11

    This Startup Plan encompasses activities necessary to perform startup and operation of the LDUA in Facility Group 3 tanks and complete turnover to CPO. The activities discussed in this plan will occur prior to, and following the US Department Energy, Richland Operations Office Operational Readiness Review. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this startup plan need not be Unresolved Safety Question (USQ) screened.

  3. Solid-State Lighting Program Overview Brochure | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Solid-State Lighting Program Overview Brochure (1.52 MB) More Documents & Publications Solid-State Lighting Emerging Lighting Technology December 2014 Postings

  4. DOE Solid-State Lighting Program: Modest Investments, Extraordinary...

    Energy Savers [EERE]

    Modest Investments, Extraordinary Impacts DOE Solid-State Lighting Program Shaping the Future of Solid-State Lighting Today, LED (light-emitting diode) technologies illuminate ...

  5. Evaluation Helps Program Increase Sales of Energy Saving Light...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluation Helps Program Increase Sales of Energy Saving Light Bulbs Among Women Evaluation Helps Program Increase Sales of Energy Saving Light Bulbs Among Women This document,...

  6. NREL-Lessons Learned from Energy Efficiency Lighting Programs...

    Open Energy Info (EERE)

    Lessons Learned from Energy Efficiency Lighting Programs Webinar Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Lessons Learned from Energy Efficiency Lighting Programs...

  7. Light Water Reactor Sustainability Program - Non-Destructive...

    Office of Environmental Management (EM)

    Light Water Reactor Sustainability Program - Non-Destructive Evaluation R&D Roadmap for ... important information to the Light Water Reactor Sustainability (LWRS) program ...

  8. Natural Gas Multi-Year Program Plan

    SciTech Connect (OSTI)

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  9. Appraisers Project Plan: Wireless Controls and Retrofit LED Lighting Demonstration

    Broader source: Energy.gov [DOE]

    Appraisers Project Plan: Wireless Controls and Retrofit LED Lighting Demonstration Measurement and Verification Report This report details the measurement and verification tools and methods used to evaluate the effectiveness of wireless lighting controls and LED lighting at the Appraisers Building, a federal office building in San Francisco, CA.

  10. Fermilab | Directorate | Program Planning Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the future, by: Organizing and chairing weekly All Experimenters Meetings. Monitoring the progress of the program schedule implementation. Organizing and chairing Experiment...

  11. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    The manual establishes program planning and management requirements for the Departments Safeguards and Security. Chg 1, dated 3-7-06 Cancels DOE N 473.9, DOE M 470.1-1 Chg 2.

  12. NATIONAL TRU PROGRAM LESSONS LEARNED PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    16-3560 Revision 0 NATIONAL TRU PROGRAM LESSONS LEARNED PLAN Revision 0 March 2016 U.S. DEPARTMENT OF ENERGY CARLSBAD FIELD OFFICE DOE/CBFO 16-3560 Revision 0 2 NATIONAL TRU PROGRAM LESSONS LEARNED PLAN Revision 0 Effective March 9, 2016 Prepared by: //Signature on File// Date: March 7,2016 J.R. Stroble, Director TRU Sites and Transportation Division Concurred by: //Signature on File// Date: March 7,2016 Casey Gadbury, Assistant Manager Office of the Program Management National TRU Program

  13. Quality assurance program plan for Building 327

    SciTech Connect (OSTI)

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 327. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements. This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP 113 1, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996.

  14. Solid-State Lighting R&D Plan June 2016

    Broader source: Energy.gov (indexed) [DOE]

    Solid-State Lighting Program Building Technologies Office Office of Energy Efficiency and Renewable ... In most regions of the world, even with government policy support, less than ...

  15. Building Technologies Program Multi-Year Program Plan Program Portfolio Management 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for program portfolio management, including the program portfolio management process, program analysis, performance assessment, stakeholder interactions, and cross-cutting issues.

  16. State Energy Program Helps States Plan

    Broader source: Energy.gov (indexed) [DOE]

    Program Helps States Plan and Implement Energy Efficiency The U.S. Department of Energy (DOE) State Energy Program (SEP) provides grants and technical assis- tance to states and U.S. territories to promote energy conservation and reduce the growth of energy demand in ways that are consistent with national energy goals. State energy offices use SEP funds to develop state plans that identify opportunities for adopting renewable energy and energy efficiency technologies, and implementing pro-

  17. Tank waste remediation system program plan

    SciTech Connect (OSTI)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  18. Tank waste remediation system environmental program plan

    SciTech Connect (OSTI)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  19. Planning integration FY 1996 program plan. Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M&I) contract.

  20. ACRV instrumentation plan for NMD HTK light gas gun tests

    SciTech Connect (OSTI)

    Dobie, D W

    1999-04-12

    In support of the NMD Hit-To-Kill Program for the US Army, twenty scaled tests on simulated nuclear targets are planned. The AEDC Light Gas Gun operated by Sverdrup Technology (SVT) in Tullahoma, TN will launch the scaled NMD projectile into scaled targets. The target for all the tests is a 1/4-scale version of the Attitude Controlled Re-Entry Vehicle (ACRV). The targets were designed and fabricated by Sandia National Laboratories (SNL) and Lawrence Livermore National Laboratory (LLNL). ITT Systems (ITT) is the integrating contractor for coordination of the multiple contractors involved in these tests. The targets are inert and contain no hazardous materials. The payloads have been instrumented to aid in post-test evaluation of the functional status of the postulated weapon systems. This document describes the instrumentation methods to be used on these tests.

  1. Evaluation Helps Program Increase Sales of Energy Saving Light...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Increase Sales of Energy Saving Light Bulbs Among Women Evaluation Helps Program ... the Case Study Series, explaining how "Evaluation Helps Program Increase Sales of Energy ...

  2. Quality assurance program plan fuel supply shutdown

    SciTech Connect (OSTI)

    Metcalf, I.L.

    1998-09-21

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP.

  3. Test Plan for Heat Cycle Research Program, Phase I Supercritical...

    Office of Scientific and Technical Information (OSTI)

    Test Plan for Heat Cycle Research Program, Phase I Supercritical Cycle Tests Citation Details In-Document Search Title: Test Plan for Heat Cycle Research Program, Phase I ...

  4. Celebrating Science: Jefferson Lab Plans Evening Programs on...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Celebrating Science: Jefferson Lab Plans Evening Programs on Oct. 7 and 9 as Part of Virginia Science Festival Week Celebrating Science: Jefferson Lab Plans Evening Programs on ...

  5. State Energy Program Helps States Plan and Implement Energy Efficiency...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Helps States Plan and Implement Energy Efficiency State Energy Program Helps States Plan and Implement Energy Efficiency The U.S. Department of Energy (DOE) State Energy Program ...

  6. Sample Business Plan Framework 1: A program seeking to continue...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sample Business Plan Framework 1: A program seeking to continue operations in the ... U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan ...

  7. DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity...

    Energy Savers [EERE]

    DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report DOE Uranium Leasing ...

  8. Bioenergy Technologies Office Multi-Year Program Plan: March...

    Office of Environmental Management (EM)

    Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies ...

  9. Bioenergy Technologies Office Multi-Year Program Plan: March...

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Bioenergy Technologies Office Multi-Year Program Plan: March 2016 Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update Bioenergy ...

  10. Bioenergy Technologies Office Multi-Year Program Plan: November...

    Office of Environmental Management (EM)

    Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies ...

  11. Bioenergy Technologies Office Multi-Year Program Plan: July 2014...

    Office of Environmental Management (EM)

    Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update -- Sections This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy ...

  12. Bioenergy Technologies Office Multi-Year Program Plan: March...

    Office of Environmental Management (EM)

    Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update -- Sections This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy ...

  13. Bioenergy Technologies Office Multi-Year Program Plan: November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update -- Sections Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update -- Sections This ...

  14. Information Technology Standards Program management plan

    SciTech Connect (OSTI)

    1998-05-01

    This document presents a logical and realistic plan to implement the Information Technology (IT) Standards Program throughout the Department of Energy (DOE). It was developed by DOE Chief Information Officer (CIO) staff, with participation from many other individuals throughout the DOE complex. The DOE IT Standards Program coordinates IT standards activities Department-wide, including implementation of standards to support the DOE Information Architecture. The Program is voluntary, participatory, and consensus-based. The intent is to enable accomplishment of the DOE mission, and the Program is applicable to all DOE elements, both Federal and contractor. The purpose of this document is to describe the key elements of the DOE IT Standards Program.

  15. River Protection Project (RPP) Environmental Program Plan

    SciTech Connect (OSTI)

    POWELL, P.A.

    2000-03-29

    This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

  16. Building Technologies Program Multi-Year Program Plan Program Overview 2008

    SciTech Connect (OSTI)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan Program Overview 2008, including market overview and federal role, program vision, mission, design and structure, and goals and multi-year targets.

  17. Ocean Thermal Energy Conversion Program Management Plan

    SciTech Connect (OSTI)

    Combs, R E

    1980-01-01

    The Office of the Associate Laboratory Director for Energy and Environmental Technology has established the OTEC Program Management Office to be responsible for the ANL-assigned tasks of the OTEC Program under DOE's Chicago Operations and Regional Office (DOE/CORO). The ANL OTEC Program Management Plan is essentially a management-by-objective plan. The principal objective of the program is to provide lead technical support to CORO in its capacity as manager of the DOE power-system program. The Argonne OTEC Program is divided into three components: the first deals with development of heat exchangers and other components of OTEC power systems, the second with development of biofouling counter-measures and corrosion-resistant materials for these components in seawater service, and the third with environmental and climatic impacts of OTEC power-system operation. The essential points of the Management Plan are summarized, and the OTEC Program is described. The organization of the OTEC Program at ANL is described including the functions, responsibilities, and authorities of the organizational groupings. The system and policies necessary for the support and control functions within the organization are discussed. These functions cross organizational lines, in that they are common to all of the organization groups. Also included are requirements for internal and external reports.

  18. Building Technologies Program: Planned Activities for 2007-2012

    SciTech Connect (OSTI)

    None, None

    2007-01-01

    The multi-year program plan for the Building Technologies Program, for the years between 2007 and 2012.

  19. Headquarters Facilities Master Security Plan- Chapter 10, Security Awareness Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 10, Security Awareness Program Describes the DOE Headquarters Security Awareness Program

  20. Environmental Restoration Program Document Control Plan

    SciTech Connect (OSTI)

    Montgomery, L.M.

    1993-09-01

    This Environmental Restoration (ER) Program Document Control Plan has been developed to comply with the document control system requirements of the US Department of Energy, Richland Operations Office (RL), the Hanford Federal Facility and the ER Program. One of the five components, or summary subprojects, of the Environmental Restoration (ER) Program is program management and support, which includes both management systems development and information and data management. Efforts within the management systems development area include the creation of a document control plan. Westinghouse Hanford Company (WHC) has developed and established an overall document control system that governs the methods by which all WHC documents are generated, maintained, and disposed of. The ER Program performing organizations within WHC utilize the established WHC document control systems to the maximum extent possible. These systems are discussed in Chapters 3.0 and 4.0 of this plan. In addition, this plan describes the documents that require control within the ER Program and how they will be controlled.

  1. Tank waste remediation system program plan

    SciTech Connect (OSTI)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  2. Light Water Reactor Sustainability (LWRS) Program - R&D Roadmap...

    Office of Environmental Management (EM)

    Damage in Piping Light Water Reactor Sustainability (LWRS) Program - R&D Roadmap for Non-Destructive Evaluation (NDE) of Fatigue Damage in Piping Light water reactor sustainability ...

  3. Draft Multi-Year Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energys Building Technologies Office (BTO) has released its draft Multi-Year Program Plan (MYPP) for public comment. The draft MYPP provides a broad overview of buildings energy use and efficiency opportunities, and the strategies and goals of BTO to substantially accelerate the rate of efficiency improvements in both new and existing residential and commercial buildings.

  4. Protection Programming Defensive Planning for Fixed Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NOT MEASUREMENT SENSITIVE DOE STD-1207-2012 December 2012 DOE STANDARD Protection Program Defensive Planning For Fixed Facilities U.S. Department of Energy AREA SANS Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DOE STD-1207-2012 This Page Intentionally Left Blank ii DOE STD-1207-2012 TABLE OF CONTENTS

  5. Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program Plan |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Program Plan Nuclear Energy Advanced Modeling and Simulation (NEAMS) Program Plan The NEAMS program plan includes information on the program vision, objective, scope, schedule and cost, management, development team and collaborations. NEAMS Executive Program Plan.pdf (1.2 MB) More Documents & Publications NEAMS Quarterly Report April-June 2013 Nuclear Energy Advanced Modeling and Simulation (NEAMS) Software Verification and Validation (V&V) Plan Requirements

  6. Nuclear Safety Research and Development Program Operating Plan | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Program Operating Plan Nuclear Safety Research and Development Program Operating Plan July 5, 2012 Nuclear Safety Research and Development Program Operating Plan This operating plan outlines the mission, goals, and processes for the Department of Energy's (DOE) Nuclear Safety Research & Development (NSR&D) Program. This first version of the operating plan also discusses the startup phase of the program. NSR&D involves a systematic search for knowledge to advance the

  7. Natural and accelerated bioremediation research program plan

    SciTech Connect (OSTI)

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

  8. Doing Business with DOE's Solid-State Lighting Program | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Doing Business with DOE's Solid-State Lighting Program Doing Business with DOE's Solid-State Lighting Program Doing Business Factsheet January 2016 (923.71 KB) More Documents & ...

  9. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  10. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Technical Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  11. Fusion Nuclear Science and Technology Program - Status and Plans...

    Office of Environmental Management (EM)

    Plans for Tritium Research Fusion Nuclear Science and Technology Program - Status and Plans for Tritium Research Presentation from the 34th Tritium Focus Group Meeting held in ...

  12. Fusion Nuclear Science and Technology Program - Status and plans...

    Office of Environmental Management (EM)

    plans for tritium research Fusion Nuclear Science and Technology Program - Status and plans for tritium research Presentation from the 35th Tritium Focus Group Meeting held in ...

  13. Mission Plan for the Civilian Radioactive Waste Management Program...

    Broader source: Energy.gov (indexed) [DOE]

    this Mission Plan for the Civilian Radioactive Waste Management Program. The Mission Plan is divided into two parts. Part I describes the overall goals, objectives, and...

  14. 2011 Annual Planning Summary for Loan Programs Office (LPO) ...

    Energy Savers [EERE]

    Planning Summary for Fossil Energy, National Energy Technology Laboratory, RMOTC, and Strategic Petroleum Reserve Field Office 2012 Annual Planning Summary for Loan Program...

  15. Bioenergy Technologies Office Multi-Year Program Plan: May 2013...

    Broader source: Energy.gov (indexed) [DOE]

    Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. ... More Documents & Publications Bioenergy Technologies Office Multi-Year Program Plan: July ...

  16. Safeguards and Security Program Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-08-26

    The manual establishes program planning and management requirements for the Departments Safeguards and Security (S&S) Program. Change 2 is a revision to Section M of both the Manual and the CRD to realign the process for establishing deviations from DOE directives containing safeguards and security requirements to reflect established Departmental policy as set forth in DOE O 251.1C. Original publication, 8-26-05; Chg 1, 3-7-06. Canceled by DOE O 470.4B

  17. Environmental Restoration Quality Program Implementation Plan. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  18. Who's Evaluating What? Planned Program Evaluations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Who's Evaluating What? Planned Program Evaluations Who's Evaluating What? Planned Program Evaluations Better Buildings Peer Exchange Call, Who's Evaluating What? - Planned Program Evaluations, November 17, 2011. During this call participants shared their evaluation plans and initial results and discussed DOE and fellow programs' evaluation efforts. Discussion Summary (530.03 KB) More Documents & Publications Process Evaluation of the Better Buildings Neighborhood Program, Final Evaluation

  19. Reading Municipal Light Department- Commercial Lighting Retrofit Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Reading Municipal Light Department (RMLD) offers incentives for non-residential customers to install energy-efficient lighting and sensors in existing facilities. Rebates are limited to $20,000 per...

  20. N Reactor Deactivation Program Plan. Revision 4

    SciTech Connect (OSTI)

    Walsh, J.L.

    1993-12-01

    This N Reactor Deactivation Program Plan is structured to provide the basic methodology required to place N Reactor and supporting facilities {center_dot} in a radiologically and environmentally safe condition such that they can be decommissioned at a later date. Deactivation will be in accordance with facility transfer criteria specified in Department of Energy (DOE) and Westinghouse Hanford Company (WHC) guidance. Transition activities primarily involve shutdown and isolation of operational systems and buildings, radiological/hazardous waste cleanup, N Fuel Basin stabilization and environmental stabilization of the facilities. The N Reactor Deactivation Program covers the period FY 1992 through FY 1997. The directive to cease N Reactor preservation and prepare for decommissioning was issued by DOE to WHC on September 20, 1991. The work year and budget data supporting the Work Breakdown Structure in this document are found in the Activity Data Sheets (ADS) and the Environmental Restoration Program Baseline, that are prepared annually.

  1. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    Fuel Cell Technologies Publication and Product Library (EERE)

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities

  2. Bioenergy Technologies Office Multi-Year Program Plan: March...

    Energy Savers [EERE]

    Bioenergy Technologies Office Multi-Year Program Plan: March 2016 This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It ...

  3. Bioenergy Technologies Office Multi-Year Program Plan: July 2014...

    Office of Environmental Management (EM)

    Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. ...

  4. Office of Building Technology, State and Community Programs Strategic Plan

    SciTech Connect (OSTI)

    None, None

    2009-01-18

    This is the strategic plan for the Building Technology Program in 1998. This describes trends in the BTP program and projects goals for the future.

  5. 2013 Annual Planning Summary for the Loan Program Office | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Loan Program Office 2013 Annual Planning Summary for the Loan Program Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and ...

  6. Poudre Valley REA- Commercial Lighting Rebate Program

    Broader source: Energy.gov [DOE]

    Poudre Valley Rural Electric Association (PVREA), a Touchstone Energy Cooperative, offers a variety of lighting rebates to commercial customers. Rebates are available on commercial lighting...

  7. Xcel Energy - Residential Lighting Discount Program | Department...

    Broader source: Energy.gov (indexed) [DOE]

    in stores. Discounts do not apply to ENERGY STAR qualified fixtures, fans or lamps. Free Lighting Demonstrations Focus on Energy provides free lighting demonstrations at retail...

  8. Headquarters Facilities Work Planning and Control Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program (1.88 MB) More Documents & Publications AUDIT REPORT: OAS-L-04-07 CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 Independent Oversight Review, DOE Headquarters Facilities - March 2002

  9. Better Buildings Neighborhood Program: Energy Efficiency Market Sustainable Business Planning

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Energy Efficiency Market Sustainable Business Planning, October 25, 2011.

  10. BETO Announces Updated Multi-Year Program Plan

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office is pleased to announce the release of its newly updated Multi-Year Program Plan (MYPP).

  11. Wind Energy Multiyear Program Plan for 2007-2012

    SciTech Connect (OSTI)

    None

    2009-01-18

    Detailed plan for the Wind Energy Program's activities from 2007-1012, including goals, targets, and barriers.

  12. Multi-Year Program Plan, Building Regulatory Programs: 2010-2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Multi-Year Program Plan - Building Regulatory Programs - U.S. Department of Energy - Energy Efficiency and Renewable Energy - Building Technologies Program - October 2010 This...

  13. Multi-Year Program Plan, Building Regulatory Programs: 2010-2015

    Broader source: Energy.gov [DOE]

    This Multi-Year Program Plan covers Building Regulatory Programs under the Office of Energy Efficiency and Renewable Energy, Building Technologies Program, and was published in October, 2010.

  14. Radiological Assistance Program Flight Planning Tool

    Energy Science and Technology Software Center (OSTI)

    2011-12-19

    The Radiological Assitance Program (RAP) is the National Nuclear Security Administration's (NNSA) first responder to radiological emergencies. RAP's mission is to identify and minimize radiological hazards, as well as provide radiological emergency response and technical advice to decision makers. One tool commonly used is aerial radiation detection equipment. During a response getting this equipment in the right place quickly is critical. The RAP Flight Planning Tool (a ArcGIS 10 Desktop addin) helps minimize this responsemore » time and provides specific customizable flight path information to the flight staff including maps, coordinates, and azimuths.« less

  15. Mixed Waste Focus Area program management plan

    SciTech Connect (OSTI)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal.

  16. Planning aquatic ecosystem restoration monitoring programs

    SciTech Connect (OSTI)

    Thom, R.M.; Wellman, K.F.

    1997-01-01

    This study was conducted as part of the Evaluation of Environmental Investments Research Program (EEIRP). The EEIRP is sponsored by the US Army Corps of Engineers. The objectives of this work are to (1) identify relevant approaches and features for environmental investment measures to be applied throughout the project life; (2) develop methods to access the effectiveness of the approach or feature for providing the intended environmental output; (3) develop and provide guidance for formulating environmental projects; and (4) provide guidance for formulating and identifying relevant cost components of alternate restoration plans.

  17. Protection Program Defensive Planning for Fixed Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    STANDARD Protection Program Defensive Planning For Fixed Facilities U.S. Department of Energy AREA SANS Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE STD-1207-2012 December 2012 ──────────────── CHANGE NOTICE NO.1 SEPTEMBER 2015 DOE STD-1207-2012 This Page Intentionally Left Blank DOE STD-1207-2012 i ATTACHMENT 1 Change Notice No. 1 DOE STD-1207-2012 September 2015 Protection

  18. Radiological Assistance Program Flight Planning Tool

    SciTech Connect (OSTI)

    2011-12-19

    The Radiological Assitance Program (RAP) is the National Nuclear Security Administration's (NNSA) first responder to radiological emergencies. RAP's mission is to identify and minimize radiological hazards, as well as provide radiological emergency response and technical advice to decision makers. One tool commonly used is aerial radiation detection equipment. During a response getting this equipment in the right place quickly is critical. The RAP Flight Planning Tool (a ArcGIS 10 Desktop addin) helps minimize this response time and provides specific customizable flight path information to the flight staff including maps, coordinates, and azimuths.

  19. Doing Business with DOE's Solid-State Lighting Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Doing Business with DOE's Solid-State Lighting Program Solid-state lighting (SSL) is an ... Both DOE and the National Science Foundation (NSF) fund Small Business Innovation Research ...

  20. Tillamook County PUD- Dairy Lighting Retrofit Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Tillamook PUD offers the Dairy Lighting Retrofit Program for its agricultural, commercial, and industrial members to save energy on lighting in eligible barns/facilities. Tillamook PUD completes a...

  1. Atmospheric Radiation Measurement Program Science Plan. Current Status and

    Office of Scientific and Technical Information (OSTI)

    Future Directions of the ARM Science Program (Technical Report) | SciTech Connect Technical Report: Atmospheric Radiation Measurement Program Science Plan. Current Status and Future Directions of the ARM Science Program Citation Details In-Document Search Title: Atmospheric Radiation Measurement Program Science Plan. Current Status and Future Directions of the ARM Science Program The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate

  2. Solid Waste Assurance Program Implementation Plan

    SciTech Connect (OSTI)

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixed waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.

  3. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Coordination

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  4. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Benefits

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  5. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Challenges

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  6. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Program Management

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  7. Seattle City Light- Built Smart Program for Builders and Architects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Seattle City Light provides incentives for builders, developers, and architects who construct energy efficient multi-family buildings. The program is designed to encourage the construction of...

  8. Lakeview Light and Power - Energy Smart Grocer Rebate Program...

    Broader source: Energy.gov (indexed) [DOE]

    Light and Power, in association with the Bonneville Power Administration, offers the Energy Smart Program through which grocery stores, convenient stores, and similar vendors...

  9. Wakefield Municipal Gas & Light Department- Residential Conservation Services Program

    Broader source: Energy.gov [DOE]

    The Wakefield Municipal Gas & Light Department (WMGLD), offers the "Incentive Rebate Program" to encourage residential customers to improve the energy efficiency of their homes. After a home...

  10. Marblehead Municipal Light Department- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    The Marblehead Municipal Light Department encourages conservation within the residential sector through the Energy Efficiency Rebate Program. Rebates are available for energy efficient appliances,...

  11. Seattle City Light- Commercial Energy Efficiency Rebate Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Seattle City Light offers a variety of rebates to commercial and industrial customers through the Energy Smart Services Program. Energy Smart Services are available to commercial businesses,...

  12. Environmental Restoration Quality Program Plan. Environmental Restoration Program

    SciTech Connect (OSTI)

    Colley, J.S.

    1992-08-01

    The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

  13. DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Report | Department of Energy Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report DOE Uranium Leasing Program 2015 Mitigation Action Plan Activity Summary Report (447.33 KB) More Documents & Publications LM Annual NEPA Planning Summary 2014 EA-1535: Final Programmatic Environmental Assessment EA-1934: 2015 Annual Report for Mitigation Action

  14. The Department of Energy Hydrogen and Fuel Cells Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydrogen and Fuel Cells Program Plan An Integrated Strategic Plan for the Research, Development, and Demonstration of Hydrogen and Fuel Cell Technologies September 2011 The Department of Energy Hydrogen and Fuel Cells Program Plan Department of Energy Hydrogen and Fuel Cells Program Plan The need for clean, sustainable, and domestically produced energy has never been greater. The call for green jobs and U.S. leadership in clean energy, combined with the need to reduce emissions and our growing

  15. Building Technologies Program Planning Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning Summary Building Technologies Program Planning Summary This is a summary of the U.S. Department of Energy Building Technologies Program plans for conducting research and development of energy-efficient buildings in the United States. btp_planning.pdf (362.6 KB) More Documents & Publications Before the Senate Energy and Natural Resources Committee Microsoft PowerPoint - 06 Crawley Drive for Net Zero Energy Commercial Buildings Before the House Transportation and

  16. Inland Power & Light Company- Residential Energy Efficiency Rebate Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Inland Power & Light offers a variety of rebates for the purchase of energy efficient equipment. Customers should see the program web site for rebate applications and full program details.

  17. Kansas City Power & Light- Residential Rebate Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Note: Many of KCP&L's rebate programs (including this one) expired at the end of 2015. New programs are expected to begin in spring 2016.

  18. Monitoring Plan for Weatherization Assistance Program, State Energy Program, Energy Efficiency and Conservation Block Grants

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    American Recovery and Reinvestment Act Office of Energy Efficiency and Renewable Energy Weatherization and Intergovernmental Program Monitoring Plan for Weatherization Assistance Program State Energy Program Energy Efficiency and Conservation Block Grants Revised: June 30, 2010 U.S. Department of Energy Office of Weatherization and Intergovernmental Program Monitoring Plan for Weatherization Assistance Program State Energy Program Energy Efficiency and Conservation Block Grants Concurrences:

  19. Light Water Reactor Sustainability Program: Integrated Program Plan

    Broader source: Energy.gov [DOE]

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more...

  20. Agricultural Lighting and Equipment Rebate Program

    Broader source: Energy.gov [DOE]

    In Vermont, agricultural operations are eligible for prescriptive and customized incentives for equipment proven to help make farms more efficient. Prescriptive rebates are available for lighting...

  1. Pedernales Electric Cooperative- Commercial Lighting Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    For existing and new commercial construction, Pedernales Electric Cooperative provides incentives for kW saved through efficient lighting. Rebates vary based upon whether construction is new or...

  2. Duquesne Light Company- Residential Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    Duquesne Light provides rebates to its residential customers for purchasing and installing energy-saving equipment. Eligible equipment includes dehumidifiers, freezers, refrigerators, air conditi...

  3. About the Solid-State Lighting Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    About the Solid-State Lighting Program About the Solid-State Lighting Program The Energy Policy Act of 2005 (EPACT 2005) and the Energy Independence and Security Act of 2007 (EISA 2007) issued directives to the Secretary of Energy to carry out a Next Generation Lighting Initiative to support SSL R&D. The legislation directs DOE to support research, development, demonstration, and commercial application activities related to advanced SSL technologies. In order to effectively fulfill the

  4. GSG-GIS development program plan

    SciTech Connect (OSTI)

    Lee, R.C.

    1992-10-15

    For the past 40 years, the Savannah River Site (SRS) has been subjected to numerous geological and geotechnical investigations in support of facility construction and waste site development and remediation. Over this period,.a variety of different subcontractors have collected large quantities of geoscience data. In addition, current programs involve numerous investigators from different departments, and consequently, earth science data and interpretations are scattered among the departments, investigators, and subcontractors at SRS. As a result, scientific and management decisions cannot take advantage of the significant body of information that exists at SRS. Recent DOE Orders (Systematic Evaluation Program, 1991) have put specific requirements on their contractors to compile geological databases to coordinate DOE site data gathering and interpretations, and to assist in compiling safety analysis reports. The Earth Science Advisory Committee and the Environmental Advisory Committee have also made specific recommendations on the management of SRS geoscience data. This plan describes a management system to identify, communicate, and compile SRS geological (including geohydrologic), seismological, and geotechnical (656) data and interpretations on a Geographic Information System (GIS).

  5. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    SciTech Connect (OSTI)

    none,

    2011-09-01

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  6. Site support program plan for ICF Kaiser Hanford Company

    SciTech Connect (OSTI)

    Dieterle, S.E.

    1996-09-27

    The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.

  7. The Department of Energy Hydrogen and Fuel Cells Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  8. FY97 Geothermal R&D Program Plan

    SciTech Connect (OSTI)

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  9. Florida Power and Light- Solar Rebate Program

    Broader source: Energy.gov [DOE]

    Note: This program will not be offered after 2015. More information is available on FPL's solar rebate web site.

  10. DOE Light Truck Clean Diesel (LTCD) Program Final Caterpillar Public Report Light Truck Clean Diesel Program

    SciTech Connect (OSTI)

    Eric Fluga

    2004-09-30

    The US Department of Energy and Caterpillar entered a Cooperative Agreement to develop compression ignition engine technology suitable for the light truck/SUV market. Caterpillar, in collaboration with a suitable commercialization partner, developed a new Compression Ignition Direct Injection (CIDI) engine technology to dramatically improve the emissions and performance of light truck engines. The overall program objective was to demonstrate engine prototypes by 2004, with an order of magnitude emission reduction while meeting challenging fuel consumption goals. Program emphasis was placed on developing and incorporating cutting edge technologies that could remove the current impediments to commercialization of CIDI power sources in light truck applications. The major obstacle to commercialization is emissions regulations with secondary concerns of driveability and NVH (noise, vibration and harshness). The target emissions levels were 0.05 g/mile NOx and 0.01 g/mile PM to be compliant with the EPA Tier 2 fleet average requirements of 0.07 g/mile and the CARB LEV 2 of 0.05 g/mile for NOx, both have a PM requirement of 0.01 g/mile. The program team developed a combustion process that fundamentally shifted the classic NOx vs. PM behavior of CIDI engines. The NOx vs. PM shift was accomplished with a form of Homogeneous Charge Compression Ignition (HCCI). The HCCI concept centers on appropriate mixing of air and fuel in the compression process and controlling the inception and rate of combustion through various means such as variable valve timing, inlet charge temperature and pressure control. Caterpillar has adapted an existing Caterpillar design of a single injector that: (1) creates the appropriate fuel and air mixture for HCCI, (2) is capable of a more conventional injection to overcome the low power density problems of current HCCI implementations, (3) provides a mixed mode where both the HCCI and conventional combustion are functioning in the same combustion cycle

  11. Seattle City Light- New Construction Incentive Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Seattle City Light (SCL) works with the design teams of their commercial and industrial customers to create high performance buildings with low long-term operating costs. The utility provides...

  12. Monmouth Power & Light- Residential Energy Efficiency Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Monmouth Power & Light offers a wide range of energy efficiency rebates that encourage residential customers to save energy in their homes. To qualify for these incentives electricity must be...

  13. Seattle City Light- Vending Machine Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Seattle City Light offers qualifying customers $80 rebates for the purchase of VendingMiser Energy Efficient Vending Machines. VendingMiser reduces the energy consumption of cold drink vending...

  14. Chicopee Electric Light- Residential Solar Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Chicopee Electric Light offers rebates to residential customers who install solar photovoltaic (PV) systems on their homes. Customer rebates are $0.50 per watt for a maximum of $2,500 per...

  15. Hudson Light & Power- Photovoltaic Incentive Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Hudson Light & Power Department, the municipal utility for the Town of Hudson, offers a limited number of solar photovoltaic (PV) rebates for residential, commercial, industrial, and municipal...

  16. Northern Lights Inc.- Energy Conservation Rebate Program

    Broader source: Energy.gov [DOE]

    Northern Lights Inc. offers a variety of rebates for the purchase and installation of energy efficient appliances and measures. For the period of October 2015 - September 2016, rebates are...

  17. State Energy Program Strategic Plan for the 21st Century

    Broader source: Energy.gov [DOE]

    Representatives of DOE and the States initiated development of this Strategic Plan to clearly define the program's goals for the next 10 years.

  18. Headquarters Facilities Master Security Plan- Chapter 12, Special Access Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Chapter 12, Special Access Programs Describes DOE Headquarters procedures for reporting, investigating, and correcting Incidents of Security Concern.

  19. Quality Assurance Program Plan for FFTF effluent controls. Revision 1

    SciTech Connect (OSTI)

    Seamans, J.A.

    1995-06-08

    This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification.

  20. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  1. National Evaluation of the Weatherization Assistance Program: Preliminary Evaluation Plan for Program Year 2006

    SciTech Connect (OSTI)

    Ternes, Mark P; Schweitzer, Martin; Tonn, Bruce Edward; Schmoyer, Richard L; Eisenberg, Joel Fred

    2007-02-01

    . For example, the use of computerized audits has increased, cooling and baseload measures have been added, weatherization approaches tailored to the unique construction characteristics of mobile homes have been developed, the weatherization of large multifamily buildings has expanded and become more sophisticated, the flexibility to improve 'energy-related' health and safety has been provided, and leveraging with utilities, other state programs, and owners of large multifamily buildings has increased considerably. The Department of Energy tasked ORNL with planning the new evaluation in light of its experience in conducting the previous national evaluation and the metaevaluations. This preliminary evaluation plan, developed by ORNL, documents how the new national evaluation will be performed. In the remaining portion of this section, the purpose and fundamental questions the evaluation will address are identified and how these questions were derived is discussed.

  2. Configuration management plan for LABCORE Program

    SciTech Connect (OSTI)

    Rich, H.S.

    1995-01-03

    A hardware/software configuration management plan for LABCORE. LABCORE is a laboratory information management system used by Analytical Services.

  3. State Energy Program Strategic Plan: February 2007

    Broader source: Energy.gov [DOE]

    This strategic plan describes the challenges faced by the States and the four key goals established to meet those challenges.

  4. DOE Mentoring Guidance and Program Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Services » Learning and Workforce Development » Workforce Development » Leadership Development » DOE Mentoring Guidance and Program Plan DOE Mentoring Guidance and Program Plan If you are interested in continuous learning and self-development, the DOE Mentoring Program is for you. This guide will provide you with general information regarding mentoring at DOE. Learning about the program is the first step to facilitate effective Mentor/Mentee partnerships. It is to be used in conjunction with

  5. Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects

    SciTech Connect (OSTI)

    Richman, Eric E.

    2009-11-04

    This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.

  6. Operational Environmental Monitoring Program Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Perkins, C.J.

    1994-08-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and operational environmental monitoring performed by Westinghouse Hanford Company as it implements the Operational Environmental Monitoring program. This plan applies to all sampling and monitoring activities performed by Westinghouse Hanford Company in implementing the Operational Environmental Monitoring program at the Hanford Site.

  7. Peninsula Light Company- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Peninsula Light Company offers a rebate program for residential customers who want to install energy efficient products in homes. Rebates are provided for heat pump water heaters, heat pumps, duct...

  8. CenterPoint Energy Advanced Residential Lighting Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    CenterPoint Energy’s Advanced Lighting program provides a point-of-sale discount on the purchase of selected Energy Star® rated LED products, such as screw-in LEDs and LED fixtures, which are...

  9. Northeast utilities` energy saver lighting rebate program evaluation

    SciTech Connect (OSTI)

    Amalfi, J.; Bhagani, D.

    1996-01-01

    This paper summarizes 1993 evaluation activities conducted by Northeast Utilities (NU) for its major commercial lighting retrofut initiative, the Energy Saver Lighting Rebate (ESLR) program. These evaluations are discussed in context of company information needs and changing market conditions in the NU servcie territory, and specifically address the strengths and waknesses of these evaluation approaches.

  10. Program Evaluation: EERE Planned and Completed Evaluations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Evaluation » Information Resources » Program Evaluation: EERE Planned and Completed Evaluations Program Evaluation: EERE Planned and Completed Evaluations This section provides a list of past and planned evaluation reports for the U.S. Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE). Many of the listed reports are available as downloads. The table below tells you which offices have reports accessible as downloads. A checked box in the table -

  11. Light Water Reactor Sustainability Program. Digital Architecture Requirements

    SciTech Connect (OSTI)

    Thomas, Kenneth; Oxstrand, Johanna

    2015-03-01

    The Digital Architecture effort is a part of the Department of Energy (DOE) sponsored Light-Water Reactor Sustainability (LWRS) Program conducted at Idaho National Laboratory (INL). The LWRS program is performed in close collaboration with industry research and development (R&D) programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants (NPPs). One of the primary missions of the LWRS program is to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. Therefore, a major objective of the LWRS program is the development of a seamless digital environment for plant operations and support by integrating information from plant systems with plant processes for nuclear workers through an array of interconnected technologies. In order to get the most benefits of the advanced technology suggested by the different research activities in the LWRS program, the nuclear utilities need a digital architecture in place to support the technology. A digital architecture can be defined as a collection of information technology (IT) capabilities needed to support and integrate a wide-spectrum of real-time digital capabilities for nuclear power plant performance improvements. It is not hard to imagine that many processes within the plant can be largely improved from both a system and human performance perspective by utilizing a plant wide (or near plant wide) wireless network. For example, a plant wide wireless network allows for real time plant status information to easily be accessed in the control room, field workers’ computer-based procedures can be updated based on the real time plant status, and status on ongoing procedures can be incorporated into smart schedules in the outage command center to allow for more accurate planning of critical tasks. The goal

  12. Building America Program Research-to-Market Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    This report presents the Building America Research-to-Market Plan (Plan), including the integrated Building America Technology-to-Market Roadmaps (Roadmaps) that will guide Building America’s research, development, and deployment (RD&D) activities over the coming years. The Plan and Roadmaps will be updated as necessary to adapt to research findings and evolving stakeholder needs, and they will reflect input from DOE and stakeholders. Read more in this Building America Program Research-to-Market Plan.

  13. Operational Plan and Desktop Reference for the Veterans Employment Program

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Operational Plan and Desktop Reference for the Veterans Employment Program Operational Plan and Desktop Reference for the Veterans Employment Program DOE Guide to the President's Initiative for Veterans Employment. Includes: Department-wide policies and procedures, goals and objectives, DVAAP, information on veterans' preference and special hiring authorities, procedures for use of vocational rehabilitation programs, sources for finding veterans, and links to websites.

  14. Program Evaluation: Planning and Conducting Evaluations

    Broader source: Energy.gov [DOE]

    This area of the website takes you through step-by-step processes for planning and conducting the In-progress Peer Reviews and Impact Evaluations described on this website. In general, for each...

  15. Standard Measurement and Verification Plan for Lighting Retrofit Projects for Buildings and Building Sites

    SciTech Connect (OSTI)

    Richman, Eric E.

    2012-10-31

    This document provides a framework for standard measurement and verification (M&V) of lighting retrofit and replacement projects. It was developed to provide site owners, contractors, and other involved organizations with the essential elements of a robust M&V plan for lighting projects. It includes details on all aspects of effectively measuring light levels of existing and post-retrofit projects, conducting power measurement, and developing cost-effectiveness analysis. This framework M&V plan also enables consistent comparison among similar lighting projects, and may be used to develop M&V plans for non--lighting-technology retrofits and new installations.

  16. Civilian radioactive waste management program plan. Revision 2

    SciTech Connect (OSTI)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  17. Transuranic Waste Characterization Quality Assurance Program Plan

    SciTech Connect (OSTI)

    NONE

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  18. Energy Storage Program Planning Document (2011) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning Document (2011) Energy Storage Program Planning Document (2011) Energy storage systems have the potential to extend and optimize the operating capabilities of the grid, since power can be stored and used at a later time. This allows for flexibility in generation and distribution, improving the economic efficiency and utilization of the entire system while making the grid more reliable and robust. Additionally, alternatives to traditional power generation, including variable wind

  19. Power Electronics Research and Development Program Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Electronics Research and Development Program Plan Power Electronics Research and Development Program Plan As the United States transitions to a digital economy, the need to upgrade the nation's aging electric grid is becoming increasingly evident. Electricity demand is projected to increase by 30% between 2008 and 2035,1 and the U.S. electricity delivery system must be able to meet this demand and ensure the continued supply of reliable, secure electricity. Power Electronics Research

  20. Office of Electricity Delivery and Energy Reliability Recovery Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Electricity Delivery and Energy Reliability Recovery Program Plan Office of Electricity Delivery and Energy Reliability Recovery Program Plan Microsoft Word - OE PSRP June 5 2009 _OE_ Final.doc (105.88 KB) More Documents & Publications Microsoft Word - PSRP Updates 6-25-10_v2 Update to the 2008 EAC Report: "Smart Grid: Enabler of the New Energy Economy Report Recommendations" EAC Presentation: How DOE is Organized to Provide Leadership on Electricity

  1. CRAD, Self-Assessment Program Assessment Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Self-Assessment Program Assessment Plan CRAD, Self-Assessment Program Assessment Plan Performance Objective: Management should ensure that effective management and independent self-assessments are being conducted periodically by technically qualified personnel. [10 CFR 830.122, subpart A & DOE O 414.1A, Quality Assurance] Criteria: Managers shall assess their management processes and be actively involved in the assessment process to ensure results contribute to improved performance of

  2. Program Development Plan and Team up

    SciTech Connect (OSTI)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  3. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    SciTech Connect (OSTI)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H.

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  4. Quality assurance program plan for radionuclide airborne emissions monitoring

    SciTech Connect (OSTI)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented.

  5. Energy Engineering Analysis Program (EEAP) Fort Polk airfield lighting; lighting retrofit

    SciTech Connect (OSTI)

    1993-03-01

    The purpose of this study is to analyze the existing lighting types and levels at three different maintenance hangars (Buildings. No. 4262, No. 4295, and No. 4297) at Fort Polk and to make recommendations for the most economical and preferred new lighting fixtures, arrangements, and method of control. The Life Cycle Cost In Design (LCCID) program was used to determine the Life Cycle Cost (LCC) and Savings to Investment Ratio (SIR) for the analyzed retrofit for a 20 year study life.

  6. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Kellie, C.L.

    1996-03-28

    This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.

  7. Operating and Assurance Program Plan. Revision 4

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

  8. Environmental Restoration Program Roadmap: Strategic program plan. Addendum 1

    SciTech Connect (OSTI)

    1992-12-11

    This Addendum to the Portsmouth (PORTS) Environmental Restoration (ER) Roadmap expands on the FY 1992 strategic plan for PORTS by providing human resource loading, ADS linkages to resolution activities, and technology development information. Each of these topics is presented in a separate section.

  9. Oil program implementation plan FY 1996--2000

    SciTech Connect (OSTI)

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  10. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect (OSTI)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  11. State Energy Program Helps States Plan and Implement Energy Efficiency |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Helps States Plan and Implement Energy Efficiency State Energy Program Helps States Plan and Implement Energy Efficiency The U.S. Department of Energy (DOE) State Energy Program (SEP) provides grants and technical assistance to states and U.S. territories to promote energy conservation and reduce the growth of energy demand in ways that are consistent with national energy goals. 48100_weather_sep_fsr3.pdf (822.71 KB) More Documents & Publications State Energy Program

  12. Atmospheric Radiation Measurement Program Science Plan

    SciTech Connect (OSTI)

    Ackerman, T

    2004-10-31

    The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: Maintain the data record at the fixed ARM sites for at least the next five years. Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square. Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds. Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations. Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites. Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale. Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote facilities at

  13. State Energy Program Helps States Plan and Implement Efficiency |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy fact sheet provides an overview of the U.S. Department of Energy Weatherization and Intergovernmental Programs State Energy Program. sep_factsheet.pdf (1.42 MB) More Documents & Publications State Energy Program Helps States Plan and Implement Energy Efficiency Rebuilding Greensburg, Kansas, as a Model Green Community: A Case Study; NREL's Technical Assistance to Greensburg, June 2007-May 2009 From Tragedy to Triumph: Rebuilding Greensburg, Kansas To Be a 100%

  14. Headquarters Facilities Work Planning and Control Program

    Energy Savers [EERE]

    Conservation and Green Energy | Department of Energy Harold Washington Social Security Administration (SSA) Center Water Conservation and Green Energy Harold Washington Social Security Administration (SSA) Center Water Conservation and Green Energy Fact sheet describes the Federal Energy Management Program (FEMP) Energy Savings Performance Contract (ESPC) success story on environmental stewardship and cost savings at the Harold Washington Social Security Administration Center in Chicago,

  15. Tank farm waste characterization Technology Program Plan

    SciTech Connect (OSTI)

    Hohl, T.M.; Schull, K.E.; Bensky, M.S.; Sasaki, L.M.

    1989-03-01

    This document presents technological and analytical methods development activities required to characterize, process, and dispose of Hanford Site wastes stored in underground waste tanks in accordance with state and federal environmental regulations. The document also lists the need date, current (fiscal year 1989) funding, and estimate of future funding for each task. Also identified are the impact(s) if an activity is not completed. The document integrates these needs to minimize duplication of effort between the various programs involved.

  16. Tanks focus area multiyear program plan - FY96-FY98

    SciTech Connect (OSTI)

    1995-07-01

    The Tanks Focus Area (TFA) Multiyear Program Plan (MYPP) presents the recommended TFA technical program. The recommendation covers a 3-year funding outlook (FY96-FY98), with an emphasis on FY96 and FY97. In addition to defining the recommended program, this document also describes the processes used to develop the program, the implementation strategy for the program, the references used to write this report, data on the U.S. Department of Energy (DOE) tank site baselines, details on baseline assumptions and the technical elements, and a glossary.

  17. Solid-State Lighting R&D Plan | Department of Energy

    Energy Savers [EERE]

    of Energy (DOE) SSL Multi-Year Program Plan (MYPP) and the DOE SSL Manufacturing R&D Roadmap that DOE has published and updated in previous years. The SSL R&D Plan provides...

  18. Mixed Waste Integrated Program Quality Assurance requirements plan

    SciTech Connect (OSTI)

    Not Available

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  19. Assessment of light water reactor accident management programs and experience

    SciTech Connect (OSTI)

    Hammersley, R.J.

    1992-03-01

    The objective of this report is to provide an assessment of the current light water reactor experience regarding accident management programs and associated technology developments. This assessment for light water reactor (LWR) designs is provided as a resource and reference for the development of accident management capabilities for the production reactors at the Savannah River Site. The specific objectives of this assessment are as follows: 1. Perform a review of the NRC, utility, and industry (NUMARC, EPRI) accident management programs and implementation experience. 2. Provide an assessment of the problems and opportunities in developing an accident management program in conjunction or following the Individual Plant Examination process. 3. Review current NRC, utility, and industry technological developments in the areas of computational tools, severe accident predictive tools, diagnostic aids, and severe accident training and simulation.

  20. Hanford Site waste tank farm facilities design reconstitution program plan

    SciTech Connect (OSTI)

    Vollert, F.R.

    1994-09-06

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980`s has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan.

  1. Program and Project Management Policy for the Planning, Programming, Budgeting, and Acquisition of Capital Assets

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-10

    To establish Department of Energy (DOE) program and project management policy for the planning, programming, budgeting, and acquisition of capital assets consistent with the following Office of Management and Budget (OMB) circulars: OMB Circular A-11, Part 3, Planning, Budgeting, and Acquisition of Capital Assets, and the supplement to Part 3, Capital Programming Guide; OMB Circular A-123; OMB Circular A-127; and OMB Circular A-130. Does not cancel other directives. Canceled by DOE N 251.99

  2. Recent program evaluations: Implications for long-run planning

    SciTech Connect (OSTI)

    Baxter, L.W.; Schultz, D.K.

    1994-06-08

    Demand-side management (DSM) remains the centerpiece of California`s energy policy. Over the coming decade, California plans to meet 30 percent of the state`s incremental electricity demand and 50 percent of its peak demand with (DSM) programs. The major investor-owned utilities in California recently completed the first round of program impact studies for energy efficiency programs implemented in 1990 and 1991. The central focus of this paper is to assess the resource planning and policy implications of Pacific Gas and Electric (PG&E) Company`s recent program evaluations. The paper has three goals. First, we identify and discuss major issues that surfaced from our attempt to apply evaluation results to forecasting and planning questions. Second, we review and summarize the evaluation results for PG&E`s primary energy efficiency programs. Third, we change long-run program assumptions, based on our assessment in the second task, and then examine the impacts of these changes on a recent PG&E demand-side management forecast and resource plan.

  3. Hanford Site waste minimization and pollution prevention awareness program plan

    SciTech Connect (OSTI)

    Place, B.G.

    1998-09-24

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site`s pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office`s (RL`s) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program.

  4. Solid-State Lighting R&D Plan

    Broader source: Energy.gov (indexed) [DOE]

    ... a dramatic reduction of the use of rare-earth metals for lighting in line with the DOE ... system comprising these various elements is optimized for a particular application. ...

  5. Strategic Plan for Light Water Reactor Research and Development

    SciTech Connect (OSTI)

    2004-02-01

    The purpose of this strategic plan is to establish a framework that will allow the Department of Energy (DOE) and the nuclear power industry to jointly plan the nuclear energy research and development (R&D) agenda important to achieving the Nation's energy goals. This strategic plan has been developed to focus on only those R&D areas that will benefit from a coordinated government/industry effort. Specifically, this plan focuses on safely sustaining and expanding the electricity output from currently operating nuclear power plants and expanding nuclear capacity through the deployment of new plants. By focusing on R&D that addresses the needs of both current and future nuclear plants, DOE and industry will be able to take advantage of the synergism between these two technology areas, thus improving coordination, enhancing efficiency, and further leveraging public and private sector resources. By working together under the framework of this strategic plan, DOE and the nuclear industry reinforce their joint commitment to the future use of nuclear power and the National Energy Policy's goal of expanding its use in the United States. The undersigned believe that a public-private partnership approach is the most efficient and effective way to develop and transfer new technologies to the marketplace to achieve this goal. This Strategic Plan is intended to be a living document that will be updated annually.

  6. Coal Power Systems strategic multi-year program plans

    SciTech Connect (OSTI)

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  7. Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

    Broader source: Energy.gov [DOE]

    Developing an Evaluation Measurement and Verification Plan for Your Energy Efficiency Project/Program

  8. Configuration management program plan for Hanford site systems engineering

    SciTech Connect (OSTI)

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  9. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration`s primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  10. 1992 Resource Program, 10 Year Plan : Draft II.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1992-05-01

    The Resource Program is the Bonneville Power Administration's primary process for deciding how to meet future electricity resource needs, how much new resources to develop, which types of resources to acquire or option and how to go about acquiring them, and how much BPA will have to spend for these resources. Recognizing that BPA must make a long-term commitment to acquiring conservation effectively, the 1992 Resource Program outlines a 10-year plan. Draft 2 of the 1992 Resource Program provides a framework for discussing the funding levels proposed in the Programs in Perspective (PIP) process. Previous final resource programs have been released prior to the PIP process. This version of the Resource Program recognizes that the PIP discussions are an integral part of the resource decision-making process and, therefore, it will be finalized after PIP.

  11. SSL Pricing and Efficacy Trend Analysis for Utility Program Planning

    SciTech Connect (OSTI)

    Tuenge, J. R.

    2013-10-01

    Report to help utilities and energy efficiency organizations forecast the order in which important SSL applications will become cost-effective and estimate when each "tipping point" will be reached. Includes performance trend analysis from DOE's LED Lighting Facts® and CALiPER programs plus cost analysis from various sources.

  12. A Program Plan for Photovoltaic Buildings in Florida

    Broader source: Energy.gov [DOE]

    This document outlines plans developed by the Florida Solar Energy Center (FSEC) to support photovoltaic buildings application in the state through the first decade of the 21st century. The emphasis of this program is on identifying and increasing the value of rooftop systems to targeted end users through the use of application experiments.

  13. Multi-Year Program Plan 2011-2015

    SciTech Connect (OSTI)

    none,

    2010-12-01

    The Vehicle Technologies Multi-Year Program Plan, FY 2011 – 2015, outlines the scientific research and technologies developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration's goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  14. Performance assessment implementation plan for the geologic repository program

    SciTech Connect (OSTI)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted in the Civilian Radioactive Waste Management (CRWM) Program of the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations of repository-system performance to access compliance with regulations and to support the development of the geologic repository. To define the strategy for these evaluations, the DOE has developed this performance assessment strategy plan. This document discusses the need for such a strategy, the objectives and scope of the strategy plan, the relationship of the plan to other program plans. Additionally, it defines performance assessment and describes the roles of performance assessment in this program, discusses concepts and general strategies needed for performance assessment, outlines the content of the Safety Analysis Report, summarizes the requirements for the repository Environmental Impact Statement, discusses the requirements that apply to the site-suitability analyses and describes the site characterization. 10 figs., 7 tabs.

  15. Waste feed delivery program systems engineering implementation plan

    SciTech Connect (OSTI)

    O`Toole, S.M.

    1998-09-24

    This document defines the systems engineering processes and products planned by the Waste Feed Delivery Program to develop the necessary and sufficient systems to provide waste feed to the Privatization Contractor for Phase 1. It defines roles and responsibilities for the performance of the systems engineering processes and generation of products.

  16. Bioenergy Technologies Office Multi-Year Program Plan: July 2014

    SciTech Connect (OSTI)

    none,

    2014-07-09

    This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  17. Tank Waste Project Quality Assurance Program Plan. Revision 1

    SciTech Connect (OSTI)

    Clayton, R.E.

    1994-11-20

    This plan describes all the Quality Assurance Program elements required by DOE Order 5700.6C. The elements shall be applied as applicable to specific Tank Waste Projects. A project-specific QAPP shall be issued as a supporting document which shall be used in conjunction with this QAPP. The project specific QAPP shall describe or define any special information, instructions or requirements.

  18. Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

    SciTech Connect (OSTI)

    Dennis, Matthew L.; Cochran, John Russell; Sol Shamsaldin, Emad

    2011-10-01

    The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

  19. Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Revised: October 22, 2010 U.S. Department of Energy American Recovery and Reinvestment Act Office of Energy Efficiency and Renewable Energy Weatherization and Intergovernmental Program Appendix of Compliance Checklists Monitoring Plan for Weatherization Assistance Program State Energy Program Energy Efficiency and Conservation Block Grants U.S. Department of Energy Appendix of Compliance Checklists October 22, 2010 Concurrences: LeAnn M. Oliver Program Manager, Weatherization &

  20. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    SciTech Connect (OSTI)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  1. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect (OSTI)

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  2. UMTRA technical assistance contractor quality assurance program plan

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements.

  3. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Table of Contents

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  4. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric ...

  5. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Systems Integration

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  6. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Executive Summary

    Broader source: Energy.gov [DOE]

    The Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan presents the status of geothermal energy technologies and details program plans from 2009 through 2015, with program activities through 2025.

  7. Technology Implementation Plan. Fully Ceramic Microencapsulated Fuel for Commercial Light Water Reactor Application

    SciTech Connect (OSTI)

    Snead, Lance Lewis; Terrani, Kurt A.; Powers, Jeffrey J.; Worrall, Andrew; Robb, Kevin R.; Snead, Mary A.

    2015-04-01

    This report is an overview of the implementation plan for ORNL's fully ceramic microencapsulated (FCM) light water reactor fuel. The fully ceramic microencapsulated fuel consists of tristructural isotropic (TRISO) particles embedded inside a fully dense SiC matrix and is intended for utilization in commercial light water reactor application.

  8. The ORNL Surplus Facilities Management Program Long Range Plan

    SciTech Connect (OSTI)

    Myrick, T.E.

    1984-09-01

    The Surplus Facilities Management Program (SFMP) at Oak Ridge National Laboratory (ORNL) is part of the Department of Energy`s (DOE) National SFMP, administered by the Richland Operations Office. This program was established to provide for the management of DOE surplus radioactively contaminated facilities from the end of their operating life until final facility disposition is completed. As part of this program, the ORNL SFMP oversees some 76 individual surplus facilities, ranging in complexity from abandoned waste storage tanks to large experimental reactors. The ORNL SFMP has prepared this Long Range Plan to outline the long-term management strategy for those facilities included in the program. The primary objective of this plan are to: (1) develop a base of information for each ORNL SFMP facility, (2) conduct preliminary decommissioning analyses to identify feasible alternatives, (3) assess the current and future risk of each facility, (4) establish a priority list for the decommissioning projects, and (5) integrate the individual project costs and schedules into an overall program schedule and cost estimate for the ORNL site. The Long Range Plan also provides an overview of the ORNL SFMP management structure, specifies the decommissioning criteria to be employed, and identifies special technical problems, research and development needs, and special facilities and equipment that may be required for decommissioning operations.

  9. Utility Battery Storage Systems Program plan: FY 1994--FY 1998

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Utility Battery Storage Systems Program, sponsored by the US Department of Energy (DOE), is addressing needed improvements so that the full benefits of these systems can be realized. A key element of the Program is the quantification of the benefits of batteries used in utility applications. The analyses of the applications and benefits are ongoing, but preliminary results indicate that the widespread introduction of battery storage by utilities could benefit the US economy by more than $26 billion by 2010 and create thousands of new jobs. Other critical elements of the DOE Program focus on improving the batteries, power electronics, and control subsystems and reducing their costs. These subsystems are then integrated and the systems undergo field evaluation. Finally, the most important element of the Program is the communication of the capabilities and benefits of battery systems to utility companies. Justifiably conservative, utilities must have proven, reliable equipment that is economical before they can adopt new technologies. While several utilities are leading the industry by demonstrating battery systems, a key task of the DOE program is to inform the entire industry of the value, characteristics, and availability of utility battery systems so that knowledgeable decisions can be made regarding future investments. This program plan for the DOE Utility Battery Storage Systems Program describes the technical and programmatic activities needed to bring about the widespread use of batteries by utilities. By following this plan, the DOE anticipates that many of the significant national benefits from battery storage will be achieved in the near future.

  10. Environmental development plan for transportation programs: FY80 update

    SciTech Connect (OSTI)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  11. THE NUCLEAR MATERIAL MEASUREMENT PROGRAM PLAN FOR GOSATOMNADZOR OF RUSSIA

    SciTech Connect (OSTI)

    Bokov, Dmitry; Byers, Kenneth R.

    2003-08-01

    As the Russian State regulatory agency responsible for oversight of nuclear material control and accounting (MC&A), Gosatomnadzor of Russia determines the status of the MC&A programs at Russian facilites by testing the nuclear material inventory for accounting record accuracy. Currently, Gosatomnadzor is developing and implementing an approach to planning and conducting MC&A inspections using non-destructive assay (NDA) instruments that will provide for consistent application of MC&A measurement inspection objectives throughtout Russia. This Gosatomnadzor NDA Program Plan documents current NDA measurement capability in all regions of Gosatomnadzor; provides justification for upgrades to equipment, procedures and training; and defines the inspector-facility operator interface as it relates to NDA measurement equipment use. This plan covers a three-year measurement program cycle, but will be reviewed and updated annually to ensure that adequate inspection resources are available to meet the demands of the inspection schedule. This paper presents the elements of this plan and describes the process by which Gosatomnadzor ensures that its NDA instruments are effectively utilized, procedures are developed and certified, and inspection personnel are properly trained to provide assurance that Russian nuclear facilities are in compliance with Russian MC&A regulations.

  12. LED Lighting Facts® Program Supports Accuracy in SSL Product Information

    SciTech Connect (OSTI)

    2013-09-30

    Fact sheet that provides a summary of LED Lighting Facts, a program to assure that LED lighting is accurately represented in the marketplace, illustrated by the LED Lighting Facts label to disclose product performance data.

  13. FirstEnergy (Mon Power & Potomac Edison)- Business Lighting Incentive Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    FirstEnergy's commercial, industrial, and governmental customers are eligible to participate in the Business Lighting Incentive Program. This program provides a performance-based rebate for energ...

  14. Multiyear Program Plan for the High Temperature Materials Laboratory

    SciTech Connect (OSTI)

    Arvid E. Pasto

    2000-03-17

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

  15. Multiyear Program Plan: Reducing Friction and Wear in Heavy Vehicles

    SciTech Connect (OSTI)

    R.R. Fessler; G.R. Fenske

    1999-12-13

    As described in its multiyear program plan for 1998-2000, the Office of Heavy Vehicle Technologies (OHVT) envisions the development of a fuel-flexible, energy-efficient, near-zero-emissions, heavy-duty U.S. diesel engine technology devolving into all truck classes as a real and viable strategy for reducing energy requirements for commercial transport services and the rapidly growing multipurpose vehicle market (pickups, vans, and sport utility vehicles). Implementation of the OHVT program plan will have significant national benefits in energy savings, cleaner air, more jobs, and increased gross domestic product (GDP). Successful implementation will reduce the petroleum consumption of Class 1-8 trucks by 1.4 million barrels of oil per day by 2020 and over 1.8 million by 2030, amounting to a reduction in highway petroleum consumption of 13.2% and 18.6%, respectively. All types of regulated emissions will be reduced, that is, 20% drop in PM10 emissions (41,000 metric tons per year) by 203 0, 17% reduction in CO2 greenhouse gases (205 million metric tons per year), 7% reduction in NOx, 20% reduction in NMHC, and 30% reduction in CO. An increase of 15,000 jobs by 2020 is expected, as is an increase of $24 billion in GDP. The strategy of OHVT is to focus primarily on the diesel engine since it has numerous advantages. It has the highest efficiency of any engine today, 45% versus 30% for production gasoline engines; and it can be made more efficient at least to 55% and possibly up to 63%. It is the engine of choice for heavy vehicles (trucks), because it offers power, efficiency, durability, and reliability and is used extensively in rail, marine, and off-road applications. Its emission can be ultra-low to near zero, and the production infrastructure is already in place. The primary goals of OHVT are as follows: (1) Develop by 2002 the diesel-engine enabling technologies to support large-scale industry dieselization of light trucks, achieving a 35% fuel efficiency

  16. ERD UMTRA Project quality assurance program plan, Revision 7

    SciTech Connect (OSTI)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors.

  17. Plutonium stabilization and handling quality assurance program plan

    SciTech Connect (OSTI)

    Weiss, E.V.

    1998-04-22

    This Quality Assurance Program Plan (QAPP) identifies project quality assurance requirements for all contractors involved in the planning and execution of Hanford Site activities for design, procurement, construction, testing and inspection for Project W-460, Plutonium Stabilization and Handling. The project encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM.

  18. Evaluation Helps Program Increase Sales of Energy Saving Light Bulbs Among

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Women | Department of Energy Program Increase Sales of Energy Saving Light Bulbs Among Women Evaluation Helps Program Increase Sales of Energy Saving Light Bulbs Among Women This document, from the Wisconsin Focus on Energy / ENERGY STAR Products Program, is part of the Case Study Series, explaining how "Evaluation Helps Program Increase Sales of Energy Saving Light Bulbs Among Women." ENERGY STAR Case Study (307.01 KB) More Documents & Publications Compact Fluorescent Lighting

  19. Comment submitted by United Lighting, Inc. regarding the Energy Star Verification Testing Program

    Broader source: Energy.gov [DOE]

    This document is a comment submitted by United Lighting, Inc. regarding the Energy Star Verification Testing Program

  20. Concord Municipal Light Plant- Commercial Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Concord Municipal Light Plant (CMLP) offers rebates to commercial customers for installing energy efficient lighting. General lighting upgrades to facilities are eligible for a 50% rebate worth up...

  1. Self-assessment program implementation plan. Revision A

    SciTech Connect (OSTI)

    Quets, A.L.

    1991-10-23

    This implementation plan identifies and describes the tasks that must be completed in order to successfully implement a Self-Assessment (SA) Program. The purpose of the Self-Assessment Program is to comply with applicable Department of Energy (DOE) directives and orders, Federal, State, and local regulations, operate the Pinellas Plant according to best management practices, and achieve excellence in all operating areas. The Self-Assessment Program will be applied to the Pinellas Plant facility which includes buildings, grounds, equipment, operations, and activities under the control of line management. Furthermore, all applicable disciplines under environmental protection, safety, health and management will be covered by the program. The Self-Assessment Program has been designed to accomplish the following tasks: define the scope of the Self-Assessment Program; assign organizational roles and responsibilities; address EH and S functional elements and management issues; develop a Self-Assessment program charter and policy; identify all applicable EH and S codes, regulations and standards; develop self-assessment procedures and instructions; generate a Self-Assessment Manual; develop a master schedule for facility appraisals and audits; design checklists and report formats for recording appraisal data; implement an assessment tracking and reporting system; implement a root cause analysis and corrective action system; implement a trend analysis and lessons learned system; and establish a formal training program.

  2. UMTRA Project Office quality assurance program plan. Revision 6

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors.

  3. Lawrence Livermore National Laboratory (LLNL) Waste Minimization Program Plan

    SciTech Connect (OSTI)

    Heckman, R.A. ); Tang, W.R. )

    1989-08-04

    This Program Plan document describes the background of the Waste Minimization field at Lawrence Livermore National Laboratory (LLNL) and refers to the significant studies that have impacted on legislative efforts, both at the federal and state levels. A short history of formal LLNL waste minimization efforts is provided. Also included are general findings from analysis of work to date, with emphasis on source reduction findings. A short summary is provided on current regulations and probable future legislation which may impact on waste minimization methodology. The LLN Waste Minimization Program Plan is designed to be dynamic and flexible so as to meet current regulations, and yet is able to respond to an everchanging regulatory environment. 19 refs., 12 figs., 8 tabs.

  4. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect (OSTI)

    Washington TRU Solutions

    2002-09-24

    U.S. Department of Energy (DOE) Order 5400.1, General Environmental Protection Program, requires each DOE site to prepare a Groundwater Protection Management Program Plan. This document fulfills the requirement for the Waste Isolation Pilot Plant (WIPP). This document was prepared by the Hydrology Section of the Westinghouse TRU Solutions LLC (WTS) Environmental Compliance Department, and it is the responsibility of this group to review the plan annually and update it every three years. This document is not, nor is it intended to be, an implementing document that sets forth specific details on carrying out field projects or operational policy. Rather, it is intended to give the reader insight to the groundwater protection philosophy at WIPP.

  5. Hanford Waste Vitrification Plant Project Waste Form Qualification Program Plan

    SciTech Connect (OSTI)

    Randklev, E.H.

    1993-06-01

    The US Department of Energy has created a waste acceptance process to help guide the overall program for the disposal of high-level nuclear waste in a federal repository. This Waste Form Qualification Program Plan describes the hierarchy of strategies used by the Hanford Waste Vitrification Plant Project to satisfy the waste form qualification obligations of that waste acceptance process. A description of the functional relationship of the participants contributing to completing this objective is provided. The major activities, products, providers, and associated scheduling for implementing the strategies also are presented.

  6. Light Duty Utility Arm interface control document plan

    SciTech Connect (OSTI)

    Engstrom, J.W.

    1994-12-27

    This document describes the interface control documents that will be used to identify and control interface features throughout all phases of the Light Duty Utility Arm (LDUA) development and design. After the system is built, delivered and installed in the Cold Test Facility and later at the tank farm, the Interface Control Documents can be used in maintaining the configuration control process. The Interface Control Document will consist of Interface Control Drawings and a data base directly tied to the Interface Control Drawings. The data base can be used as an index to conveniently find interface information. Design drawings and other text documents that contain interface information will appear in the database. The Interface Control Drawings will be used to document and control the data and information that define the interface boundaries between systems, subsystems and equipment. Also, the interface boundaries will define the areas of responsibility for systems and subsystems. The drawing will delineate and identify all the physical and functional interfaces that required coordination to establish and maintain compatibility between the co-functioning equipment, computer software, and the tank farm facilities. An appendix contains the Engineering interface control database system riser manual.

  7. Report of the Integrated Program Planning Activity for the DOE Fusion Energy Sciences Program

    SciTech Connect (OSTI)

    2000-12-01

    This report of the Integrated Program Planning Activity (IPPA) has been prepared in response to a recommendation by the Secretary of Energy Advisory Board that, ''Given the complex nature of the fusion effort, an integrated program planning process is an absolute necessity.'' We, therefore, undertook this activity in order to integrate the various elements of the program, to improve communication and performance accountability across the program, and to show the inter-connectedness and inter-dependency of the diverse parts of the national fusion energy sciences program. This report is based on the September 1999 Fusion Energy Sciences Advisory Committee's (FESAC) report ''Priorities and Balance within the Fusion Energy Sciences Program''. In its December 5,2000, letter to the Director of the Office of Science, the FESAC has reaffirmed the validity of the September 1999 report and stated that the IPPA presents a framework and process to guide the achievement of the 5-year goals listed in the 1999 report. The National Research Council's (NRC) Fusion Assessment Committee draft final report ''An Assessment of the Department of Energy's Office of Fusion Energy Sciences Program'', reviewing the quality of the science in the program, was made available after the IPPA report had been completed. The IPPA report is, nevertheless, consistent with the recommendations in the NRC report. In addition to program goals and the related 5-year, 10-year, and 15-year objectives, this report elaborates on the scientific issues associated with each of these objectives. The report also makes clear the relationships among the various program elements, and cites these relationships as the reason why integrated program planning is essential. In particular, while focusing on the science conducted by the program, the report addresses the important balances between the science and energy goals of the program, between the MFE and IFE approaches, and between the domestic and international aspects

  8. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.

  9. Data Quality Assurance Program Plan for NRC Division of Risk Analysis Programs at the INL

    SciTech Connect (OSTI)

    Sattison, Martin B.; Wierman, Thomas E.; Vedros, Kurt G.; Germain, Shawn W. St.; Eide, Steven A.; Sant, Robert L.

    2009-07-01

    The Division of Risk Analysis (DRA), Office of Nuclear Regulatory Research (RES), must ensure that the quality of the data that feed into its programs follow Office of Management and Budget (OMB) and U.S. Nuclear Regulatory Commission (NRC) guidelines and possibly other standards and guidelines used in nuclear power plant risk analyses. This report documents the steps taken in DRAs Data Quality Improvement project (Job Control Number N6145) to develop a Data Quality Assurance Program Plan. These steps were 1. Conduct a review of data quality requirements 2. Review current data programs, products, and data quality control activities 3. Review the Institute of Nuclear Power Operation (INPO) Equipment Performance and Information Exchange (EPIX) data quality programs and characterize the EPIX data quality and uncertainty 4. Compare these programs, products, and activities against the requirements 5. Develop a program plan that provides assurance that data quality is being maintained. It is expected that the Data Quality Assurance Program Plan will be routinely implemented in all aspects of future data collection and processing efforts and that specific portions will be executed annually to provide assurance that data quality is being maintained.

  10. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  11. Quality Assurance Program Plan for AGR Fuel Development and Qualification Program

    SciTech Connect (OSTI)

    W. Ken Sowder

    2004-02-01

    Quality Assurance Plan (QPP) is to document the Idaho National Engineering and Environmental Laboratory (INEEL) Management and Operating (M&O) Contractor’s quality assurance program for AGR Fuel Development and Qualification activities, which is under the control of the INEEL. The QPP is an integral part of the Gen IV Program Execution Plan (PEP) and establishes the set of management controls for those systems, structures and components (SSCs) and related quality affecting activities, necessary to provide adequate confidence that items will perform satisfactorily in service.

  12. Smart Grid R&D Multi-Year Program Plan (2010-2014) - September...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Smart Grid R&D Multi-Year Program Plan (2010-2014) - September 2011 Update Smart Grid R&D Multi-Year Program Plan (2010-2014) - September 2011 Update The Smart Grid Research and...

  13. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan

    SciTech Connect (OSTI)

    none,

    2009-02-01

    This 2008 Multi-Year Research, Development, and Demonstration Program Plan covers the 2009-2015 period with program activities to 2025.

  14. Materials Inventory Database for the Light Water Reactor Sustainability Program

    SciTech Connect (OSTI)

    Kazi Ahmed; Shannon M. Bragg-Sitton

    2013-08-01

    Scientific research involves the purchasing, processing, characterization, and fabrication of many sample materials. The history of such materials can become complicated over their lifetime – materials might be cut into pieces or moved to various storage locations, for example. A database with built-in functions to track these kinds of processes facilitates well-organized research. The Material Inventory Database Accounting System (MIDAS) is an easy-to-use tracking and reference system for such items. The Light Water Reactor Sustainability Program (LWRS), which seeks to advance the long-term reliability and productivity of existing nuclear reactors in the United States through multiple research pathways, proposed MIDAS as an efficient way to organize and track all items used in its research. The database software ensures traceability of all items used in research using built-in functions which can emulate actions on tracked items – fabrication, processing, splitting, and more – by performing operations on the data. MIDAS can recover and display the complete history of any item as a simple report. To ensure the database functions suitably for the organization of research, it was developed alongside a specific experiment to test accident tolerant nuclear fuel cladding under the LWRS Advanced Light Water Reactor Nuclear Fuels Pathway. MIDAS kept track of materials used in this experiment from receipt at the laboratory through all processes, test conduct and, ultimately, post-test analysis. By the end of this process, the database proved to be right tool for this program. The database software will help LWRS more efficiently conduct research experiments, from simple characterization tests to in-reactor experiments. Furthermore, MIDAS is a universal tool that any other research team could use to organize their material inventory.

  15. Risk communications and the Chemical Stockpile Emergency-Planning Program

    SciTech Connect (OSTI)

    Vogt, B.M.; Sorensen, J.H.

    1994-09-01

    The CSEPP (Chemical Stockpile Emergency Preparedness Program) was created to improve emergency planning and response capabilities at the eight sites around the country that store chemical weapons. These weapons are scheduled to be destroyed in the near future. In preparation of the Draft Programmatic Environmental Impact Statement (DPEIS) for the Chemical Stockpile Disposal Program (CSDP), it was proposed that the Army mitigate accidents through an enhanced community emergency preparedness program at the eight storage sites. In 1986, the Army initiated the development of an Emergency Response Concept Plan (ERCP) for the CSDP, one of 12 technical support studies conducted during preparation of the Final Programmatic Environmental Impact Statement (FPEIS). The purpose of this document is to provide a fairly comprehensive source book on risk, risk management, risk communication research and recommended risk communication practices. It does not merely summarize each publication in the risk communication literature, but attempts to synthesize them along the lines of a set of organizing principles. Furthermore, it is not intended to duplicate other guidance manuals (such as Covello et al.`s manual on risk comparison). The source book was developed for the CSEPP in support of the training module on risk communications. Although the examples provided are specific to CSEPP, its use goes beyond that of CSEPP as the findings apply to a broad spectrum of risk communication topics. While the emphasis is on communication in emergency preparedness and response specific to the CSEPP, the materials cover other non-emergency communication settings. 329 refs.

  16. HTGR Spent Fuel Treatment Program. HTGR Spent Fuel Treatment Development Program Plan

    SciTech Connect (OSTI)

    Not Available

    1984-12-01

    The spent fuel treatment (SFT) program plan addresses spent fuel volume reduction, packaging, storage, transportation, fuel recovery, and disposal to meet the needs of the HTGR Lead Plant and follow-on plants. In the near term, fuel refabrication will be addressed by following developments in fresh fuel fabrication and will be developed in the long term as decisions on the alternatives dictate. The formulation of this revised program plan considered the implications of the Nuclear Waste Policy Act of 1982 (NWPA) which, for the first time, established a definitive national policy for management and disposal of nuclear wastes. Although the primary intent of the program is to address technical issues, the divergence between commercial and government interests, which arises as a result of certain provisions of the NWPA, must be addressed in the economic assessment of technically feasible alternative paths in the management of spent HTGR fuel and waste. This new SFT program plan also incorporates a significant cooperative research and development program between the United States and the Federal Republic of Germany. The major objective of this international program is to reduce costs by avoiding duplicate efforts.

  17. Bioenergy Technologies Office Multi-Year Program Plan: March 2016

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

  18. Westinghouse Hanford Company quality assurance program and implementation plan

    SciTech Connect (OSTI)

    Moss, S.S., Westinghouse Hanford

    1996-07-01

    This is the first revision of the Quality AssurancePlan/Implementation Plan (QAP/IP) for nuclear facilities managedand operated by the Westinghouse Hanford Company (WHC).Development of the initial IP required review of the WHC qualityassurance program to the requirements of the 10 CFR 830.120, andcompletion of initial baseline assessments against the QAP toverify implementation of the program. Each WHC-managed nuclearfacility provided a stand-alone section to the QAP/IP, describingits mission and life-cycle status. WHC support organizationsalso performed assessments for their lead areas, and providedinputs to a separate stand-alone section with the initialbaseline assessment results. In this first revision, the initialbaseline matrixes for those facilities found to be in compliancewith the QAP have been removed. Tank Waste Remediation System(TWRS) and K Basins have modified their baseline matrixes to showcompletion of action items to date. With the followingexceptions, the WHC-managed nuclear facilities and their supportorganizations were found to have implemented QA programs thatsatisfy the requirements of 10 CFR 830.120. TWRS identifiedImplementation Plan Action Items having to do with: generationand revision of as-built drawings; updating TWRS organizationaland program documents; tracking the condition/age ofmaterials/equipment; and reconstitution of design bases forexisting, active facilities. No incremental funding needs wereidentified for FY95. For FY97, TWRS identified incrementalfunding in the amount of $65,000 for as-built drawings, and$100,000 for tracking the age/condition of materials/equipment.The K Basin Fuel Storage Facility identified Implementation PlanAction Items having to do with: training; updating procedures;establishing configuration management; reconstituting designbases; and providing darwings; and developing integrated,resource-loaded schedules. Incremental funding needs in theamount of $1.7 million were identified, over a time

  19. 200 Area Liquid Effluent Facilities -- Quality assurance program plan

    SciTech Connect (OSTI)

    Fernandez, L.

    1995-03-13

    This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collection of effluents, treatment, concentration of secondary wastes, verification, sampling and disposal of treated effluents and solids related with the LEF operations, conform to established requirements.

  20. Next Generation Nuclear Plant Methods Technical Program Plan

    SciTech Connect (OSTI)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-12-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the “highly ranked” phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  1. Next Generation Nuclear Plant Methods Technical Program Plan -- PLN-2498

    SciTech Connect (OSTI)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2010-09-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the highly ranked phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  2. Next Generation Nuclear Plant Methods Technical Program Plan

    SciTech Connect (OSTI)

    Richard R. Schultz; Abderrafi M. Ougouag; David W. Nigg; Hans D. Gougar; Richard W. Johnson; William K. Terry; Chang H. Oh; Donald W. McEligot; Gary W. Johnsen; Glenn E. McCreery; Woo Y. Yoon; James W. Sterbentz; J. Steve Herring; Temitope A. Taiwo; Thomas Y. C. Wei; William D. Pointer; Won S. Yang; Michael T. Farmer; Hussein S. Khalil; Madeline A. Feltus

    2007-01-01

    One of the great challenges of designing and licensing the Very High Temperature Reactor (VHTR) is to confirm that the intended VHTR analysis tools can be used confidently to make decisions and to assure all that the reactor systems are safe and meet the performance objectives of the Generation IV Program. The research and development (R&D) projects defined in the Next Generation Nuclear Plant (NGNP) Design Methods Development and Validation Program will ensure that the tools used to perform the required calculations and analyses can be trusted. The Methods R&D tasks are designed to ensure that the calculational envelope of the tools used to analyze the VHTR reactor systems encompasses, or is larger than, the operational and transient envelope of the VHTR itself. The Methods R&D focuses on the development of tools to assess the neutronic and thermal fluid behavior of the plant. The fuel behavior and fission product transport models are discussed in the Advanced Gas Reactor (AGR) program plan. Various stress analysis and mechanical design tools will also need to be developed and validated and will ultimately also be included in the Methods R&D Program Plan. The calculational envelope of the neutronics and thermal-fluids software tools intended to be used on the NGNP is defined by the scenarios and phenomena that these tools can calculate with confidence. The software tools can only be used confidently when the results they produce have been shown to be in reasonable agreement with first-principle results, thought-problems, and data that describe the highly ranked phenomena inherent in all operational conditions and important accident scenarios for the VHTR.

  3. High-level waste management technology program plan

    SciTech Connect (OSTI)

    Harmon, H.D.

    1995-01-01

    The purpose of this plan is to document the integrated technology program plan for the Savannah River Site (SRS) High-Level Waste (HLW) Management System. The mission of the SRS HLW System is to receive and store SRS high-level wastes in a see and environmentally sound, and to convert these wastes into forms suitable for final disposal. These final disposal forms are borosilicate glass to be sent to the Federal Repository, Saltstone grout to be disposed of on site, and treated waste water to be released to the environment via a permitted outfall. Thus, the technology development activities described herein are those activities required to enable successful accomplishment of this mission. The technology program is based on specific needs of the SRS HLW System and organized following the systems engineering level 3 functions. Technology needs for each level 3 function are listed as reference, enhancements, and alternatives. Finally, FY-95 funding, deliverables, and schedules are s in Chapter IV with details on the specific tasks that are funded in FY-95 provided in Appendix A. The information in this report represents the vision of activities as defined at the beginning of the fiscal year. Depending on emergent issues, funding changes, and other factors, programs and milestones may be adjusted during the fiscal year. The FY-95 SRS HLW technology program strongly emphasizes startup support for the Defense Waste Processing Facility and In-Tank Precipitation. Closure of technical issues associated with these operations has been given highest priority. Consequently, efforts on longer term enhancements and alternatives are receiving minimal funding. However, High-Level Waste Management is committed to participation in the national Radioactive Waste Tank Remediation Technology Focus Area. 4 refs., 5 figs., 9 tabs.

  4. Quality assurance program plan for SNF characterization support project

    SciTech Connect (OSTI)

    Tanke, J.M.

    1997-05-22

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  5. National Ignition Facility Quality Assurance Program Plan. Revision 1

    SciTech Connect (OSTI)

    Wolfe, C.R.; Yatabe, J.

    1996-09-01

    The National Ignition Facility (NIF) is a key constituent of the Department of Energy`s Stockpile Stewardship Program. The NIF will use inertial confinement fusion (ICF) to produce ignition and energy gain in ICF targets, and will perform weapons physics and high-energy- density experiments in support of national security and civilian objectives. The NIF Project is a national facility involving the collaboration of several DOE laboratories and subcontractors, including Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), and the University of Rochester Laboratory for Laser Energetics (UR/LLE). The primary mission of the NIF Project is the construction and start-up operation of laser-based facilities that will demonstrate fusion ignition in the laboratory to provide nuclear-weapons-related physics data, and secondarily, to propagate fusion burn aimed at developing a potential source of civilian energy. To support the accomplishment of this very important mission, the LLNL Laser Directorate created the NIF Project Office to organize and bring about the Project. The NIF Project Office has established this Quality Assurance Program to ensure its success. This issue of the Quality Assurance Program Plan (QAPP) adds the requirements for the conduct of Title 11 design, construction, procurement, and Title III engineering. This QAPP defines and describes the program-the management system-for specifying, achieving, and assuring the quality of all NIF Project work consistent with the policies of the Laboratory and the Laser Directorate.

  6. The Fast Flux Test Facility shutdown program plan

    SciTech Connect (OSTI)

    Guttenberg, S.; Jones, D.H.; Midgett, J.C.; Nielsen, D.L.

    1995-01-01

    The Fast Flux Test Facility (FFTF) is a 400 MWt sodium-cooled research reactor owned by the US Department of Energy (DOE) and operated by the Westinghouse Hanford Company (WHC) on the Hanford Site in southeastern Washington State. The decision was made by the DOE in December, 1993, to initiate shutdown of the FFTF. This paper describes the FFTF Transition Project Plan (1) (formerly the FFTF Shutdown Program Plan) which provides the strategy, major elements, and project baseline for transitioning the FFTF to an industrially and radiologically safe shutdown condition. The Plan, and its resource loaded schedule, indicate this transition can be achieved in a period of six to seven years at a cost of approximately $359 million. The transition activities include reactor defueling, fuel offload to dry cask storage, sodium drain and reaction, management of sodium residuals, shutdown of auxiliary systems, and preparation of appropriate environmental and regulatory documentation. Completion of these activities will involve resolution of many challenging and unique issues associated with shutdown of a large sodium reactor facility. At the conclusion of these activities, the FFTF will be in a safe condition for turnover to the Hanford Site Environmental Restoration Contractor for a long term surveillance and maintenance phase and decommissioning.

  7. TRUPACT-II Hydrogen G-Valve Program Test Plan

    SciTech Connect (OSTI)

    Mroz, Eugene J.

    1999-01-01

    This test plan describes the objectives, scope, participants, and components of the Transuranic Package Transporter-II (TRUPACT-II) Hydrogen G-Value Program (GH2P). The GH2P builds on the experience, results, and experimental setup of the TRUPACT-II Matrix Depletion Program (MDP) to establish effective hydrogen G-values (G-values) for additional waste matrices. This plan details the experimental design and test matrices for experiments to measure the G-value for additional waste matrices, including first- and second-stage sludges at the Idaho National Engineering and Environmental Laboratory, and molten salt extraction residues with varying amounts of residual moisture (i.e., unbound water). Data collected from the GH2P will be used to support an application to the US Nuclear Regulatory Commission for G-values and corresponding wattage limits for the TRUPACT-II payloads containing these waste matrices. The testing will also evaluate the ability to determine G-values on a waste stream basis.

  8. UMTRA Project Office Quality Assurance Program Plan. Revision 5

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites in accordance with Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRA Project`s mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. The US Department of Energy (DOE) UMTRA Project Office directs the overall Project. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria (set forth in the reference documents) has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. The UMTRA Project Office shall require each Project contractor to prepare and submit for approval a more detailed QAPP that is based on the applicable criteria of this QAPP and the referenced documents. All QAPPs on the UMTRA Project shall fit within the framework of this plan or an industry standard format that has been approved by the DOE Project Office.

  9. Spectrally Enhanced Lighting Program Implementation for Energy Savings: Field Evaluation

    SciTech Connect (OSTI)

    Gordon, Kelly L.; Sullivan, Gregory P.; Armstrong, Peter R.; Richman, Eric E.; Matzke, Brett D.

    2006-08-22

    This report provides results from an evaluation PNNL conducted of a spectrally enhanced lighting demonstration project. PNNL performed field measurements and occupant surveys at three office buildings in California before and after lighting retrofits were made in August and December 2005. PNNL measured the following Overhead lighting electricity demand and consumption, Light levels in the workspace, Task lighting use, and Occupant ratings of satisfaction with the lighting. Existing lighting, which varied in each building, was replaced with lamps with correlated color temperature (CCT) of 5000 Kelvin, color rendering index (CRI) of 85, of varying wattages, and lower ballast factor electronic ballasts. The demonstrations were designed to decrease lighting power loads in the three buildings by 22-50 percent, depending on the existing installed lamps and ballasts. The project designers hypothesized that this reduction in electrical loads could be achieved by the change to higher CCT lamps without decreasing occupant satisfaction with the lighting.

  10. ISSUANCE 2015-06-25: Energy Conservation Program: Energy Conservation Standards for Ceiling Fan Light Kits, Notice of Proposed Rulemaking

    Broader source: Energy.gov [DOE]

    Energy Conservation Program: Energy Conservation Standards for Ceiling Fan Light Kits, Notice of Proposed Rulemaking

  11. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan - Section 6.0 Program Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Multi-Year Research, Development and Demonstration Plan Page 6 - 1 6.0 Program Management and Operations The U.S. Department of Energy's (DOE's) Hydrogen and Fuel Cells Program (the Program) is composed of activities within the Offices of Energy Efficiency and Renewable Energy (EERE); Fossil Energy (FE); Nuclear Energy (NE); and Science (SC). EERE's Fuel Cell Technologies Program (FCT Program) represents the major component of this effort. The FCT Program Manager manages the

  12. Taunton Municipal Lighting Plant- Residential and Non-Profit Weatherization Program

    Broader source: Energy.gov [DOE]

    Taunton Municipal Lighting Plant (TMLP) offers the 'House N Home' Thermal Rebate Program, which provides financial incentives to residential and non-profit customers for making buildings more...

  13. Text-Alternative Version: MSSLC Member Case Studies- LED Street Lighting Programs Webinar

    Broader source: Energy.gov [DOE]

    Below is the text-alternative version of the "MSSLC Member Case Studies - LED Street Lighting Programs" webcast, held May 8, 2013.

  14. Spectrally Enhanced Lighting Program Implementation for Energy Savings: Field Evaluation

    SciTech Connect (OSTI)

    Gordon, K. L.; Sullivan, G. P.; Armstrong, P. R.; Richman, E. E.; Matzke, B. D.

    2006-08-01

    This report provides results from an evaluation of lighting retrofits at three office buildings in California in 2005.

  15. Program plan for the resolution of tank vapor issues

    SciTech Connect (OSTI)

    Osborne, J.W.; Huckaby, J.L.

    1994-05-01

    Since 1987, workers at the Hanford Site waste tank farms in Richland, Washington, have reported strong odors emanating from the large, underground high-level radioactive waste storage tanks. Some of these workers have complained of symptoms (e.g., headaches, nausea) related to the odors. In 1992, the U.S. Department of Energy, which manages the Hanford Site, and Westinghouse Hanford Company determined that the vapor emissions coming from the tanks had not been adequately characterized and represented a potential health risk to workers in the immediate vicinity of the tanks. At that time, workers in certain areas of the tank farms were required to use full-face, supplied-breathing-air masks to reduce their exposure to the fugitive emissions. While use of supplied breathing air reduced the health risks associated with the fugitive emissions, it introduced other health and safety risks (e.g., reduced field of vision, air-line tripping hazards, and heat stress). In 1992, an aggressive program was established to assure proper worker protection while reducing the use of supplied breathing air. This program focuses on characterization of vapors inside the tanks and industrial hygiene monitoring in the tank farms. If chemical filtration systems for mitigation of fugitive emissions are deemed necessary, the program will also oversee their design and installation. This document presents the plans for and approach to resolving the Hanford Site high-level waste tank vapor concerns. It is sponsored by the Department of Energy Office of Environmental Restoration and Waste Management.

  16. Proceedings of the flexible, midsize gas turbine program planning workshop

    SciTech Connect (OSTI)

    1997-03-01

    The US Department of Energy (DOE) and the California Energy Commission (CEC) held a program planning workshop on March 4--5, 1997 in Sacramento, California on the subject of a flexible, midsize gas turbine (FMGT). The workshop was also co-sponsored by the Electric Power Research Institute (EPRI), the Gas Research Institute (GRI), the Gas Turbine Association (GTA), and the Collaborative Advanced Gas Turbine Program (CAGT). The purpose of the workshop was to bring together a broad cross section of knowledgeable people to discuss the potential benefits, markets, technical attributes, development costs, and development funding approaches associated with making this new technology available in the commercial marketplace. The participants in the workshop included representatives from the sponsoring organizations, electric utilities, gas utilities, independent power producers, gas turbine manufacturers, gas turbine packagers, and consultants knowledgeable in the power generation field. Thirteen presentations were given on the technical and commercial aspects of the subject, followed by informal breakout sessions that dealt with sets of questions on markets, technology requirements, funding sources and cost sharing, and links to other programs.

  17. Quality Assurance Program Plan (QAPP) Waste Management Project

    SciTech Connect (OSTI)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  18. UMTRA technical assistance contractor Quality Assurance Program Plan. Revision 4

    SciTech Connect (OSTI)

    Pehrson, P.

    1993-10-12

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation.

  19. DOE National SCADA Test Bed Program Multi-Year Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National SCADA Test Bed Program Multi-Year Plan DOE National SCADA Test Bed Program Multi-Year Plan This document presents the National SCADA Test Bed Program Multi-Year Plan, a coherent strategy for improving the cyber security of control systems in the energy sector. The NSTB Program is conducted within DOE's Office of Electricity Delivery and Energy Reliability (OE), which leads national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure,

  20. Solid-State Lighting Program Overview — 2016 BTO Peer Review

    Broader source: Energy.gov [DOE]

    This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office’s Solid-State Lighting Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs.

  1. Quality Assurance Program Plan for TRUPACT-II Gas Generation Test Program

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2002-03-01

    The Gas Generation Test Program (GGTP), referred to as the Program, is designed to establish the concentration of flammable gases and/or gas generation rates in a test category waste container intended for shipment in the Transuranic Package Transporter-II (TRUPACT-II). The phrase "gas generationtesting" shall refer to any activity that establishes the flammable gas concentration or the flammable gas generation rate. This includes, but is not limited to, measurements performed directly on waste containers or during tests performed on waste containers. This Quality Assurance Program Plan (QAPP) documents the quality assurance (QA) and quality control (QC) requirements that apply to the Program. The TRUPACT-II requirements and technical bases for allowable flammable gas concentration and gas generation rates are described in the TRUPACT-II Authorized Methods for Payload Control (TRAMPAC).

  2. SSL Pricing and Efficacy Trend Analysis for Utility Program Planning

    SciTech Connect (OSTI)

    Tuenge, Jason R.

    2013-10-01

    An LED lamp or luminaire can generally be found that matches or exceeds the efficacy of benchmark technologies in a given product category, and LED products continue to expand into ever-higher lumen output niches. However, the price premium for LED continues to pose a barrier to adoption in many applications, in spite of expected savings from reduced energy use and maintenance. Other factors—such as dimmability and quality of light—can also present challenges. The appropriate type, timing, and magnitude of energy efficiency activities will vary from organization to organization based on local variables and the method of evaluation. A number of factors merit consideration when prioritizing activities for development. Category-specific projections for pricing and efficacy are provided herein to assist in efficiency program planning efforts.

  3. Next Generation Nuclear Plant Research and Development Program Plan

    SciTech Connect (OSTI)

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: (1) Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission (2) Demonstrate safe and economical nuclear-assisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: (1) High temperature gas reactor fuels behavior; (2) High temperature materials qualification; (3) Design methods development and validation; (4) Hydrogen production technologies; and (5) Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented

  4. Next Generation Nuclear Plant Research and Development Program Plan

    SciTech Connect (OSTI)

    P. E. MacDonald

    2005-01-01

    The U.S Department of Energy (DOE) is conducting research and development (R&D) on the Very High Temperature Reactor (VHTR) design concept for the Next Generation Nuclear Plant (NGNP) Project. The reactor design will be a graphite moderated, thermal neutron spectrum reactor that will produce electricity and hydrogen in a highly efficient manner. The NGNP reactor core could be either a prismatic graphite block type core or a pebble bed core. Use of a liquid salt coolant is also being evaluated. The NGNP will use very high-burnup, low-enriched uranium, TRISO-coated fuel, and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The objectives of the NGNP Project are to: Demonstrate a full-scale prototype VHTR that is commercially licensed by the U.S. Nuclear Regulatory Commission Demonstrate safe and economical nuclearassisted production of hydrogen and electricity. The DOE laboratories, led by the INL, will perform R&D that will be critical to the success of the NGNP, primarily in the areas of: High temperature gas reactor fuels behavior High temperature materials qualification Design methods development and validation Hydrogen production technologies Energy conversion. The current R&D work is addressing fundamental issues that are relevant to a variety of possible NGNP designs. This document describes the NGNP R&D planned and currently underway in the first three topic areas listed above. The NGNP Advanced Gas Reactor (AGR) Fuel Development and Qualification Program is presented in Section 2, the NGNP Materials R&D Program Plan is presented in Section 3, and the NGNP Design Methods Development and Validation R&D Program is presented in Section 4. The DOE-funded hydrogen

  5. ARM Climate Research Facility Radar Operations Plan (Program...

    Office of Scientific and Technical Information (OSTI)

    Climate Research Facility Radar Operations Plan Citation Details In-Document Search Title: ARM Climate Research Facility Radar Operations Plan Roles, responsibilities, and ...

  6. Title 43 CFR 1600-1610 Planning, Programming, Budgeting | Open...

    Open Energy Info (EERE)

    Abstract These regulations outline the process for development, approval, maintenance, amendment and revision of resource management plans, and the use of existing plans...

  7. Biomass Burning Observation Project Science Plan (Program Document...

    Office of Scientific and Technical Information (OSTI)

    Science Plan Citation Details In-Document Search Title: Biomass Burning Observation Project Science Plan Aerosols from biomass burning perturb Earth's climate through the direct ...

  8. Carbon Power & Light- Residential and Commercial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Carbon Power and Light, in collaboration with Tri-State Generation and Transmission Association, offers financial incentives for members to increase the energy efficiency of homes and facilities....

  9. McMinnville Water & Light- Conservation Service Loan Program

    Broader source: Energy.gov [DOE]

    McMinnville Water & Light offers financing to residential and commercial customers to make energy efficient improvements to eligible facilities and homes. Financing is available for pre...

  10. Taunton Municipal Lighting Plant- Residential Energy Star Appliance Rebate Program

    Broader source: Energy.gov [DOE]

    Residential customers of Taunton Municipal Lighting Plant (TMLP) are eligible for rebates on energy efficient appliances. Clothes washers, dishwashers, refrigerators, and room A/C units are...

  11. Independence Power and Light- New Homes Rebate Program

    Broader source: Energy.gov [DOE]

    Independence Power and Light offers rebates to builders for constructing new, energy efficient homes which meet ENERGY STAR standards. Builders who meet ENERGY STAR standards and install specified...

  12. Cape Light Compact- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Cape Light Compact (CLC) offers a variety of financial incentives to customers for purchasing energy efficient residential equipment. Residential customers can take advantage of incentives on...

  13. Forest Grove Light & Power- Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Forest Grove Light & Power offers a variety of rebates through Conservation Services Department. Rebates vary based on technology, and are available to residential, commercial, and/or...

  14. Chicopee Electric Light- Commercial Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Chicopee Electric Light Department (CELD) is participating in the Massachusetts Municipal Whoesale Electric Company's Green Opportunity Proagram to encourage non-residential, commercial, and...

  15. Seattle City Light- Residential Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Seattle City Light provides rebates to its customers for energy audits and purchasing and installing energy saving clothes washers, refrigerators, heat pump water heaters, ductless heat pumps,...

  16. Concord Municipal Light Plant- Residential Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Concord Municipal Light Plant (CMLP) offers residential customers rebates on home weatherization, air conditioning system upgrades, and the purchase of LED bulbs.

  17. Independence Power and Light- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Independence Power and Light (IPL) offers rebates to residential customers for purchasing new, energy efficient appliances. Rebates are available on central air conditioning systems, heat pumps,...

  18. Duquesne Light Company- Commercial and Industrial Energy Efficiency Program

    Broader source: Energy.gov [DOE]

     Duquesne Light has partnered with conservation service providers to work with specific segments of customers. These conservation service providers can assist customers with energy audits, project...

  19. Chicopee Electric Light Department- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Chicopee Electric Light Department (CELD) offers a variety of energy efficiency rebates for its residential customers. CELD provides rebates for heat pump water heaters, refrigerators, freezers,...

  20. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transmission and Distribution Programs. | Department of Energy Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. Five-Year Program Plan for Fiscal Years 2008 to 2012 for Electric Transmission and Distribution Programs. The Office of Electricity Delivery and Energy Reliability (OE) is the primary organization within the U.S. Department of Energy (DOE) for research, development, demonstration, technology transfer, and policy development

  1. Member Case Studies: LED Street Lighting Programs in Algona ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presenters John Bilsten of Algona (IA) Municipal Utilities, Maggie Ullman of the City of Asheville (NC), and Glenn Cooper of the City of Boston (MA) discussed planning, financing, ...

  2. Doing Business with DOE's Solid-State Lighting Program

    SciTech Connect (OSTI)

    2015-01-30

    This fact sheet provides an overview of funding mechanisms for research partners and projects that align with the SSL R&D Plan.

  3. Transportation Emergency Preparedness Program Plan, U.S. Department of Energy Region 6

    SciTech Connect (OSTI)

    Marsha Keister

    2010-04-01

    The United States Department of Energy (DOE) Region 6 Transportation Emergency Preparedness Program Plan (TEPP Plan) operates within the framework of the DOE emergency management system for developing, coordinating, and directing emergency planning, preparedness, and readiness assurance activities for radiological transportation incidents. The DOE Region 6 TEPP Plan is a narrative description of the DOE Transportation Emergency Preparedness Program activities, training and technical assistance provided to states and tribes along DOE's transportation corridors in DOE Region 6.

  4. Next Generation Nuclear Plant Materials Research and Development Program Plan

    SciTech Connect (OSTI)

    G.O. Hayner; R.L. Bratton; R.N. Wright

    2005-09-01

    The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years. The VHTR concept is considered to be the nearest-term reactor design that has the capability to efficiently produce hydrogen. The plant size, reactor thermal power, and core configuration will ensure passive decay heat removal without fuel damage or radioactive material releases during accidents. The NGNP Project is envisioned to demonstrate the following: (1) A full-scale prototype VHTR by about 2021; (2) High-temperature Brayton Cycle electric power production at full scale with a focus on economic performance; (3) Nuclear-assisted production of hydrogen (with about 10% of the heat) with a focus on economic performance; and (4) By test, the exceptional safety capabilities of the advanced gas-cooled reactors. Further, the NGNP program will: (1) Obtain a Nuclear Regulatory Commission (NRC) License to construct and operate the NGNP, this process will provide a basis for future performance based, risk-informed licensing; and (2) Support the development, testing, and prototyping of hydrogen infrastructures. The NGNP Materials Research and Development (R&D) Program is responsible for performing R&D on likely NGNP materials in support of the NGNP design, licensing, and construction activities. The NGNP Materials R&D Program includes the following elements: (1) Developing a specific approach, program plan and other project management tools for

  5. Building system integration research: recommendations for a US Department of Energy multiyear program plan

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This plan describes the scope, technical content, and resources required to conduct the Building System Integration (BSI) research program during FY 1987 through 1991. System integration research is defined, the need for the research is discussed, its benefits are outlined, and the history of building system integration research is summarized. The program scope, the general approach taken in developing this program plan, and the plan's contents are also described.

  6. The Two-Column Aerosol Project (TCAP) Science Plan (Program Document...

    Office of Scientific and Technical Information (OSTI)

    Program Document: The Two-Column Aerosol Project (TCAP) Science Plan Citation Details ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  7. Hydrogen, Fuel Cells and Infrastructure Technologies Program: Multiyear Research, Development and Demonstration Plan

    SciTech Connect (OSTI)

    Milliken, J.

    2007-10-01

    This plan includes goals, objectives, technical targets, tasks, and schedules for Office of Energy Efficiency and Renewable Energy's contribution to the DOE Hydrogen Program.

  8. Independence Power and Light- Commercial Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Note: Rebates have been fully subscribed for the 2014-2015 fiscal year. Check the program website July 2015 and thereafter for updates on the rebate program and funding levels.

  9. City Water Light and Power- Commercial Energy Efficiency Rebate Programs

    Broader source: Energy.gov [DOE]

    Effective March 1, 2015, the CWLP Insulation Rebate has been temporarily suspended while the program is being re-developed. A new Insulation Rebate program is expected to be announced in mid-May...

  10. Waste Isolation Pilot Plant Groundwater Protection Management Program Plan

    SciTech Connect (OSTI)

    Washington Regulatory and Environmental Services

    2005-07-01

    The DOE established the Groundwater Monitoring Program (GMP) (WP 02-1) to monitor groundwater resources at WIPP. In the past, the GMP was conducted to establish background data of existing conditions of groundwater quality and quantity in the WIPP vicinity, and to develop and maintain a water quality database as required by regulation. Today the GMP is conducted consistent with 204.1.500 NMAC (New MexicoAdministrative Code), "Adoption of 40 CFR [Code of Federal Regulations] Part 264,"specifically 40 CFR §264.90 through §264.101. These sections of 20.4.1 NMAC provide guidance for detection monitoring of groundwater that is, or could be, affected by waste management activities at WIPP. Detection monitoring at WIPP is designed to detect contaminants in the groundwater long before the general population is exposed. Early detection will allow cleanup efforts to be accomplished before any exposure to the general population can occur. Title 40 CFR Part 264, Subpart F, stipulates minimum requirements of Resource Conservation and Recovery Act of 1976 (42 United States Code [U.S.C.] §6901 et seq.) (RCRA) groundwater monitoring programs including the number and location of monitoring wells; sampling and reporting schedules; analytical methods and accuracy requirements; monitoring parameters; and statistical treatment of monitoring data. This document outlines how WIPP intends to protect and preserve groundwater within the WIPP Land Withdrawal Area (WLWA). Groundwater protection is just one aspect of the WIPP environmental protection effort. An overview of the entire environmental protection effort can be found in DOE/WIPP 99-2194, Waste Isolation Pilot Plant Environmental Monitoring Plan. The WIPP GMP is designed to statistically determine if any changes are occurring in groundwater characteristics within and surrounding the WIPP facility. If a change is noted, the cause will then be determined and the appropriate corrective action(s) initiated.

  11. Cape Light Compact- Commercial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Through a multi-member partnership, Cape Light Compact (CLC) and Mass Save offer a variety of financial incentives for commercial and industrial facilities. Custom rebate options are available for...

  12. Dayton Power and Light- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Dayton Power and Light offers rebates for heating and cooling to residential customers who purchase and install energy efficient products for the home. Eligible systems and measures include heat...

  13. Concord Municipal Light Plant- Solar Photovoltaic Rebate Program

    Broader source: Energy.gov [DOE]

    Concord Municipal Light Plant (CMLP) offers rebates to customers who install solar photovoltaic (PV) systems that are designed to offset the customer's electrical needs. Systems must be owned by...

  14. Taunton Municipal Lighting Plant- Residential PV Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Customers of Taunton Municipal Lighting Plant (TMLP) may be eligible for a $1.50/watt rebate on solar photovoltaic (PV) installations, up to a maximum rebate of $4,500. The system must be installed...

  15. Florida Power and Light- Residential Energy Efficiency Program

    Broader source: Energy.gov [DOE]

    Florida Power and Light (FPL) offers rebates to residential customers who implement certain energy efficiency improvements in eligible homes. HVAC rebates are available for the replacement of air...

  16. Reading Municipal Light Department- Business Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Reading Municipal Light Department (RMLD) offers energy efficiency incentives to eligible commercial and industrial customers. Rebates of up to $50,000 are available to customers who wish to reduce...

  17. Orcas Power & Light- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Orcas Power and Light Cooperative offers incentives for residential customers to pursue energy efficiency upgrades in eligible homes. Rebates are offered for Energy Star rated appliances, water...

  18. Randolph EMC- Commercial and Industrial Efficient Lighting Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Commercial and industrial members who upgrade to energy-efficient light bulbs which meet Randolph EMC's standards are eligible for a prescriptive incentive payment. The cooperative will provide a...

  19. McMinnville Water & Light- Commercial Energy Efficiency Rebate Programs

    Office of Energy Efficiency and Renewable Energy (EERE)

    McMinnville Water and Light Company offers a variety of rebates for commercial and industrial customers to make energy efficient improvements to eligible facilities. MW&L offers rebates in...

  20. FirstEnergy (Potomac Edison)- Municipal and Street Lighting Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    FirstEnergy (Potomac Edision) offers several incentives for non-residential and municipal customers to upgrade traffic signals, pedestrian signals, street lights to more efficient  fixtures. The...

  1. Cedarburg Light & Water Utility- Residential Energy Efficiency Rebate Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cedarburg Light & Water (CL&W) offers rebates to residential customers for a variety of energy-efficient equipment and upgrades.  Through Wisconsin Focus on Energy, CL&W provides...

  2. Chicopee Electric Light- Residential Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Chicopee Electric Light (CEL) offers a variety of incentives for its residential customers to increase the energy efficiency of participating homes. CEL provides rebates for heat pump water heaters...

  3. Reading Municipal Light Department- Residential Energy Star Appliance Rebate Program

    Broader source: Energy.gov [DOE]

    Reading Municipal Light Department (RMLD) offers rebates to residential customers who install Energy Star appliances in eligible homes. The offer is limited to one rebate per appliance, or a...

  4. City Water Light and Power- Solar Rewards Program

    Broader source: Energy.gov [DOE]

    City Water, Light and Power  (CWLP) is offering residential and commercial customers a $500 per kilowatt (kW) rebate for installing solar photovoltaic (PV) systems with a maximum rebate of up to $2...

  5. Kansas City Power & Light- Energy Optimizer Programmable Thermostat Program

    Broader source: Energy.gov [DOE]

    Kansas City Power and Light (KCP&L) offers a free programmable thermostat and free installation to qualifying customers to manage energy usage. Only residential and small commercial customers...

  6. Science Plan for the Atmospheric Radiation Measurement Program (ARM)

    SciTech Connect (OSTI)

    1996-02-01

    The purpose of this Atmospheric Radiation Measurement (ARM) Science Plan is to articulate the scientific issues driving the ARM Program, and to relate them to DOE`s programmatic objectives for ARM, based on the experience and scientific progress gained over the past five years. ARM programmatic objectives are to: (1) Relate observed radiative fluxes and radiances in the atmosphere, spectrally resolved and as a function of position and time, to the temperature and composition of the atmosphere, specifically including water vapor and clouds, and to surface properties, and sample sufficient variety of situations so as to span a wide range of climatologically relevant possibilities; (2) develop and test parameterizations that can be used to accurately predict the radiative properties and to model the radiative interactions involving water vapor and clouds within the atmosphere, with the objective of incorporating these parameterizations into general circulation models. The primary observational methods remote sending and other observations at the surface, particularly remote sensing of clouds, water vapor and aerosols.

  7. (Environmental impact assessment as applied to policies, plans and programs)

    SciTech Connect (OSTI)

    Sigal, L.L.

    1990-10-19

    A proposal to study the application of the principles of environmental impact assessment (EIA) to policy, plans, and programs was submitted by the US Environmental Protection Agency (EPA) to the Senior Advisors on Environmental and Water Problems of the United Nations Economic Commission. On approval, EPA asked Oak Ridge National Laboratory (ORNL) to support its efforts as lead participant on an international task force. ORNL is responsible for overall project management, including development of the report. At the first meeting in Geneva on June 18--19, there were representatives from Austria, Canada, Finland, Norway, Poland, Sweden, and the United Kingdom. The administrative/legal setting for EIA in each country was reviewed. The objectives of the task force were defined, and issues related to the application of EIA at the policy level were discussed. At the second meeting, in addition to those countries represented at the first meeting the Commission of Economic Communities, Czech and Slovak Federal Republic, Remark, Federal Republic of Germany, Hungary, and The Netherlands were represented. A brief review was given by the new participants of legal/administrative requirements for EIA in their countries. Case studies were presented by Canada, Finland, The Netherlands, Norway, Sweden, and the United States.

  8. Evaluation Helps Program Increase Sales of Energy Saving Light...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... higher participation rates among males. The program modified its marketing strategy to target more females, based on evaluation findings. Evaluations in 2005 and ...

  9. Cedarburg Light & Water Utility- Commercial Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    The Request for Proposals (RFP) for Energy Efficiency program is designed to encourage investment by large commercial and industrial utility customers in energy efficient improvements. Up to $2...

  10. Geothermal Energy Draft Multi-Year Program Plan: FY 1996-2000

    SciTech Connect (OSTI)

    1995-03-03

    This is an internal DOE Geothermal Program planning and control document. The Five Year Plans and Multi-Year Plans usually included more detailed rationales and projections than other similar reports. Many of these reports were issued only in draft form.

  11. Achieving Energy Savings with Highly-Controlled Lighting in an Open-Plan Office

    SciTech Connect (OSTI)

    Rubinstein, Francis; Enscoe, Abby

    2010-04-19

    An installation in a Federal building tested the effectiveness of a highly-controlled, workstation-specific lighting retrofit. The study took place in an open-office area with 86 cubicles and low levels of daylight. Each cubicle was illuminated by a direct/indirectpendant luminaire with three 32 watt lamps, two dimmable DALI ballasts, and an occupancy sensor. A centralized control system programmed all three lamps to turn on and off according to occupancy on a workstation-by-workstation basis. Field measurements taken over the course of several monthsdemonstrated 40% lighting energy savings compared to a baseline without advanced controls that conforms to GSA's current retrofit standard. A photometric analysis found that the installation provided higher desktop light levels than the baseline, while an occupant survey found that occupants in general preferred the lighting system to thebaseline.Simple payback is fairly high; projects that can achieve lower installation costs and/or higher energy savings and those in which greenhouse gas reduction and occupant satisfaction are significant priorities provide the ideal setting for workstation-specific lighting retrofits.

  12. BETO Releases 2016 Update of Multi-Year Program Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Releases 2016 Update of Multi-Year Program Plan BETO Releases 2016 Update of Multi-Year Program Plan March 28, 2016 - 11:54am Addthis The U.S. Department of Energy's (DOE's) Bioenergy Technologies Office (BETO) is pleased to announce the 2016 update of the BETO Multi-Year Program Plan (MYPP). The MYPP serves as an operational guide to help BETO manage and coordinate its activities as well as a vehicle to communicate BETO's mission, goals, and plans to stakeholders and the public. It details

  13. Liquid effluents program FY 1997 multi-year work plan

    SciTech Connect (OSTI)

    Green, F.T.

    1996-09-30

    This document provides the technical baseline and work breakdown structure for the liquid effluents program.

  14. FY 1999 annual work plan for infrastructure program WBS 6

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  15. Bioenergy Technologies Office Multi-Year Program Plan, March...

    Broader source: Energy.gov (indexed) [DOE]

    ... Project Management Center PMP - project management plan PNNL - Pacific Northwest National Laboratory Psia - pounds per square inch absolute R&D - research and development RD&D - ...

  16. Doing Business with DOE's Solid-State Lighting Program

    Energy Savers [EERE]

    and businesses that use substan- tially less electricity, making them less dependent on fossil fuels. The U.S. Department of Energy con- ducts a comprehensive R&D program to...

  17. Golden Valley Electric Association- Commercial Lighting Retrofit Rebate Program

    Broader source: Energy.gov [DOE]

    Business $ense is a Golden Valley Electric Association (GVEA) program designed to increase the efficiency with which energy is used on GVEA's system. It provides rebates of up to $20,000 to...

  18. The Department of Energy's Solid-State Lighting Program, OAS-RA-L-13-03

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Solid- State Lighting Program OAS-RA-L-13-03 February 2013 Department of Energy Washington, DC 20585 February 28, 2013 MEMORANDUM FOR THE DIRECTOR, NATIONAL ENERGY TECHNOLOGY LABORATORY FROM: Jack Rouch, Director Central Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Solid-State Lighting Program" BACKGROUND The Department of Energy's (Department) Office of Energy Efficiency and Renewable Energy established the Solid-State

  19. EIS-0182: Western Area Power Administration Energy Planning and Management Program

    Broader source: Energy.gov [DOE]

    The Western Area Power Administration (WAPA) prepared this environmental impact statement to analyze the environmental impacts of its proposal to establish an Energy Planning and Management Program to replace its Guidelines and Acceptance Criteria for the Conservation and Renewable Energy Program and to evaluate ways to make future resource commitments to existing customers. If adopted, the proposed management program would require WAPA's long-term firm customers to implement long-term energy planning to help enhance efficient electric energy use.

  20. Wind Energy Multiyear Program Plan for 2007-2012

    SciTech Connect (OSTI)

    None, None

    2007-08-01

    The purpose of this document is to provide an overview of the DOE Wind Energy Program and to describe the near and long-term goals and strategies for achieving the program's mission.

  1. Wind Energy Multiyear Program Plan For 20072012

    SciTech Connect (OSTI)

    None

    2007-08-01

    The purpose of this document is to provide an overview of the DOE Wind Energy Program and to describe the near and long-term goals and strategies for achieving the program's mission.

  2. 2012 Annual Planning Summary for Loan Program Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Loan Program Office.

  3. 2014 Annual Planning Summary for the Loan Programs Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Loan Programs Office.

  4. 2013 Annual Planning Summary for the Naval Nuclear Propulsion Program

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Naval Nuclear Propulsion Program.

  5. Clean Cities Strategic Planning White Paper: Light Duty Vehicle Fuel Economy

    SciTech Connect (OSTI)

    Saulsbury, Bo; Hopson, Dr Janet L; Greene, David; Gibson, Robert

    2015-04-01

    Increasing the energy efficiency of motor vehicles is critical to achieving national energy goals of reduced petroleum dependence, protecting the global climate, and promoting continued economic prosperity. Even with fuel economy and greenhouse gas emissions standards and various economic incentives for clean and efficient vehicles, providing reliable and accurate fuel economy information to the public is important to achieving these goals. This white paper reviews the current status of light-duty vehicle fuel economy in the United States and the role of the Department of Energy (DOE) Clean Cities Program in disseminating fuel economy information to the public.

  6. Solid-State Lighting Program Strategy Overview- 2014 BTO Peer Review

    Broader source: Energy.gov [DOE]

    Presenter: James Broderick, U.S. Department of Energy This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Solid-State Lighting Program Strategy activities. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs.

  7. Plans for Implementing the Columbia River Basin Fish and Wildlife Program in Fiscal Year 1986.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration

    1985-10-01

    The Fish and Wildlife Program is an effort to enhance, protect, and mitigate losses of those fish and wildlife which have been affected by the development, operation, and management of hydroelectric facilities in the Columbia River Basin. The implementation plan is organized to address the action items assigned to BPA in Section 1500 of the Council's Fish and Wildlife Program (1984). These action items generally relate to one or more specific measures in the Program. The following information is listed for each project: budget summary, projects, obligation plan, and work plan and milestones.

  8. Light-water breeder reactor (LWBR Development Program)

    DOE Patents [OSTI]

    Beaudoin, B.R.; Cohen, J.D.; Jones, D.H.; Marier, L.J. Jr.; Raab, H.F.

    1972-06-20

    Described is a light-water-moderated and -cooled nuclear breeder reactor of the seed-blanket type characterized by core modules comprising loosely packed blanket zones enriched with fissile fuel and axial zoning in the seed and blanket regions within each core module. Reactivity control over lifetime is achieved by axial displacement of movable seed zones without the use of poison rods in the embodiment illustrated. The seed is further characterized by a hydrogen-to-uranium-233 atom ratio in the range 10 to 200 and a uranium-233-to-thorium-232 atom ratio ranging from 0.012 to 0.200. The seed occupies from 10 to 35 percent of the core volume in the form of one or more individual islands or annuli. (NSA 26: 55130)

  9. Utah's "Solar For Schools" Program Is Bringing New Light to Education |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Utah's "Solar For Schools" Program Is Bringing New Light to Education Utah's "Solar For Schools" Program Is Bringing New Light to Education November 12, 2010 - 9:54am Addthis Gil Sperling, U.S. Department of Energy; Elise Brown, Utah State Energy Program; Janet Jameson, Hillside Teacher; Prathusha Boppana, Hillside Student; Martell Menlove, Deputy Supt of Schools; Chuck McGinnis, Johnson Controls at the Solar for Schools ribbon cutting. | Department

  10. Lighting

    Broader source: Energy.gov [DOE]

    One of the simplest ways to save energy and money is to switch to energy-efficient lights. Learn about your lighting choices that can save you money.

  11. Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2005-08-03

    The Performance Demonstration Program (PDP) for Nondestructive Assay (NDA) is a test program designed to yield data on measurement system capability to characterize drummed transuranic (TRU) waste generated throughout the Department of Energy (DOE) complex. The tests are conducted periodically and provide a mechanism for the independent and objective assessment of NDA system performance and capability relative to the radiological characterization objectives and criteria of the Office of Characterization and Transportation (OCT). The primary documents requiring an NDA PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC), which requires annual characterization facility participation in the PDP, and the Quality Assurance Program Document (QAPD). This NDA PDP implements the general requirements of the QAPD and applicable requirements of the WAC. Measurement facilities must demonstrate acceptable radiological characterization performance through measurement of test samples comprised of pre-specified PDP matrix drum/radioactive source configurations. Measurement facilities are required to analyze the NDA PDP drum samples using the same procedures approved and implemented for routine operational waste characterization activities. The test samples provide an independent means to assess NDA measurement system performance and compliance per criteria delineated in the NDA PDP Plan. General inter-comparison of NDA measurement system performance among DOE measurement facilities and commercial NDA services can also be evaluated using measurement results on similar NDA PDP test samples. A PDP test sample consists of a 55-gallon matrix drum containing a waste matrix type representative of a particular category of the DOE waste inventory and nuclear material standards of known radionuclide and isotopic composition typical of DOE radioactive material. The PDP sample components are made available to participating measurement facilities as designated by the

  12. Clean coal technologies: Research, development, and demonstration program plan

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The US Department of Energy, Office of Fossil Energy, has structured an integrated program for research, development, and demonstration of clean coal technologies that will enable the nation to use its plentiful domestic coal resources while meeting environmental quality requirements. The program provides the basis for making coal a low-cost, environmentally sound energy choice for electric power generation and fuels production. These programs are briefly described.

  13. Solid Waste Program Fiscal Year 1996 Multi-Year Program Plan WBS 1.2.1, Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    This document contains the Fiscal Year 1996 Multi-Year Program Plan for the Solid Waste Program at the Hanford Reservation in Richland, Washington. The Solid Waste Program treats, stores, and disposes of a wide variety of solid wastes consisting of radioactive, nonradioactive and hazardous material types. Solid waste types are typically classified as transuranic waste, low-level radioactive waste, low-level mixed waste, and non-radioactive hazardous waste. This report describes the mission, goals and program strategies for the Solid Waste Program for fiscal year 1996 and beyond.

  14. Section 3, Bioenergy Technologies Office Multi-Year Program Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... is available at http:energy.goveeredownloadseere-program-management-initiative-pmi-brochure. ... At the initiation of a project, a PMP is prepared for the entire project ...

  15. BATT Program- Summary and Future Plans | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    More Documents & Publications Overview of the Batteries for Advanced Transportation Technologies (BATT) Program Development of Electrolytes for Lithium-ion Batteries Development of ...

  16. IT Capital Planning Corporate Management Improvement Program (CMIP)

    Broader source: Energy.gov [DOE]

    The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the...

  17. Better Buildings Alliance, adidas Case Study: adidas Saves Energy and Costs with Planned RTU Replacement Program (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2014-09-01

    Case study describing how adidas implemented a best practice of a planned replacement program for its RTUs.

  18. Office of Alcohol Fuels Program plan, FY 1981

    SciTech Connect (OSTI)

    1980-10-01

    The goal of the Office of Alcohol Fuels is to promote the production, distribution, and use of alcohol fuels. The program objectives are defined and the strategy for implementation is described. An organizational model of the operation is included. The roles of the 3 program offices and various field offices are described. (DMC)

  19. Management Policy for Planning, Programming, Budgeting, Operation, Maintenance and Disposal of Real Property

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2002-05-20

    To establish Department of Energy (DOE) management policy for the planning, programming, budgeting, operation, maintenance and disposal of real property owned by the United States and under the custody and control of DOE.

  20. Quality assurance program plan for FRG sealed isotopic heat sources project (C-229)

    SciTech Connect (OSTI)

    Tanke, J.M.

    1997-05-16

    This QAPP implements the Quality Assurance Program Plan for the FRG Sealed Isotopic Heat Sources Project (C-229). The heat source will be relocated from the 324 Building and placed in interim storage at the Central Waste Complex (CWC).

  1. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  2. Fuel cell systems program plan, Fiscal year 1994

    SciTech Connect (OSTI)

    Not Available

    1994-07-01

    Goal of the fuel cell program is to increase energy efficiency and economic effectiveness through development and commercialization of fuel cell systems which operate on fossil fuels in multiple end use sectors. DOE is participating with the private sector in sponsoring development of molten carbonate fuel cells and solid oxide fuel cells for application in the utility, commercial, and industrial sectors. Commercialization of phosphoric acid fuel cells is well underway. Besides the introduction, this document is divided into: goal/objectives, program strategy, technology description, technical status, program description/implementation, coordinated fuel cell activities, and international activities.

  3. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

  4. Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy July 2014 Update Bioenergy Technologies Office Multi-Year Program Plan: July 2014 Update This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for

  5. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update --

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sections | Department of Energy Update -- Sections Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update -- Sections This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.

  6. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Update Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an

  7. Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy November 2014 Update Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is

  8. Test Plan for Heat Cycle Research Program, Phase I Supercritical Cycle

    Office of Scientific and Technical Information (OSTI)

    Tests (Technical Report) | SciTech Connect Test Plan for Heat Cycle Research Program, Phase I Supercritical Cycle Tests Citation Details In-Document Search Title: Test Plan for Heat Cycle Research Program, Phase I Supercritical Cycle Tests The 60 kW Heat Cycle Research Facility (HCRF) provides a means of examining different concepts and components associated with the generation of electrical power from a geothermal resource using a binary power cycle. In this power cycle the heat or energy

  9. State Energy Program awards $5 million to states for State Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Innovative Energy Practices | Department of Energy State Energy Program awards $5 million to states for State Energy Planning and Innovative Energy Practices State Energy Program awards $5 million to states for State Energy Planning and Innovative Energy Practices October 27, 2014 - 1:02pm Addthis As part of an “all-of-the-above” approach, Alabama, Arkansas, Idaho, Illinois, Kentucky, Michigan, Minnesota, New Mexico, South Carolina, Texas, Vermont, Virginia, and Washington will

  10. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    SciTech Connect (OSTI)

    White, D.L.; Mihlmester, P.E.

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  11. Quality Assurance Plan for Transportation Management Division Transportation Training Programs

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    The U.S. Department of Transportation (DOT) implemented new rules requiring minimum levels of training for certain key individuals who handle, package, transport, or otherwise prepare hazardous materials for transportation. In response to these rules, the U.S. Department of Energy (DOE), Transportation Management Division (TMD), has developed a transportation safety training program. This program supplies designed instructional methodology and course materials to provide basic levels of DOT training to personnel for whom training has become mandatory. In addition, this program provides advanced hazardous waste and radioactive material packaging and transportation training to help personnel achieve proficiency and/or certification as hazardous waste and radioactive material shippers. This training program does not include site-specific or task-specific training beyond DOT requirements.

  12. The cost and performance of utility commercial lighting programs. A report from the Database on Energy Efficiency Programs (DEEP) project

    SciTech Connect (OSTI)

    Eto, J.; Vine, E.; Shown, L.; Sonnenblick, R.; Payne, C.

    1994-05-01

    The objective of the Database on Energy Efficiency Programs (DEEP) is to document the measured cost and performance of utility-sponsored, energy-efficiency, demand-side management (DSM) programs. Consistent documentation of DSM programs is a challenging goal because of problems with data consistency, evaluation methodologies, and data reporting formats that continue to limit the usefulness and comparability of individual program results. This first DEEP report investigates the results of 20 recent commercial lighting DSM programs. The report, unlike previous reports of its kind, compares the DSM definitions and methodologies that each utility uses to compute costs and energy savings and then makes adjustments to standardize reported program results. All 20 programs were judged cost-effective when compared to avoided costs in their local areas. At an average cost of 3.9{cents}/kWh, however, utility-sponsored energy efficiency programs are not ``too cheap to meter.`` While it is generally agreed upon that utilities must take active measures to minimize the costs and rate impacts of DSM programs, the authors believe that these activities will be facilitated by industry adoption of standard definitions and reporting formats, so that the best program designs can be readily identified and adopted.

  13. Advanced Instrumentation, Information, and Control Systems Technologies Technical Program Plan

    SciTech Connect (OSTI)

    Bruce Hallbert

    2012-09-01

    Reliable instrumentation, information, and control (II&C) systems technologies are essential to ensuring safe and efficient operation of the U.S. light water reactor (LWR) fleet. These technologies affect every aspect of nuclear power plant (NPP) and balance-of-plant operations. In 1997, the National Research Council conducted a study concerning the challenges involved in modernization of digital instrumentation and control systems in NPPs. Their findings identified the need for new II&C technology integration.

  14. Health and safety plan for operations performed for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Trippet, W.A. II ); Reneau, M.; Morton, S.L. )

    1992-04-01

    This document constitutes the generic health and safety plan for the Environmental Restoration Program (ERP). It addresses the health and safety requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 standard; and EG G Idaho, Inc. This plan is a guide to individuals who must complete a health and safety plan for a task performed for the EPR. It contains a task specific addendum that, when completed, specifically addresses task specific health and safety issues. This health and safety plan reduces the time it takes to write a task specific health and safety plan by providing discussions of requirements, guidance on where specific information is located, and specific topics in the Addendum that must be discussed at a task level. This format encourages a complete task specific health and safety plan and a standard for all health and safety plans written for ERP.

  15. River Protection Project waste feed delivery program technical performance measurement assessment plan

    SciTech Connect (OSTI)

    O'TOOLE, S.M.

    1999-09-30

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle.

  16. Quality assurance program plan for low-level waste at the WSCF Laboratory

    SciTech Connect (OSTI)

    Morrison, J.A.

    1994-11-01

    The purpose of this document is to provide guidance for the implementation of the Quality Assurance Program Plan (QAPP) for the management of low-level waste at the Waste Sampling and Characterization Facility (WSCF) Laboratory Complex as required by WHC-CM-4-2, Quality Assurance Manual, which is based on Quality Assurance Program Requirements for Nuclear Facilities, NQA-1 (ASME).

  17. EMF RAPID Program research agenda and communication plan

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    The driving force behind the Electric and Magnetic Fields (EMF) Research and Public Information Dissemination (RAPID) Program, established by Section 2118 of the Energy Policy Act of 1992, is the ``sense of the Congress that remedial action taken by the Government on electric and magnetic fields, if and as necessary, should be based on, and consistent with, scientifically valid research...`` Specifically, the legislation requires the development of a comprehensive program to: determine whether or not exposure to electric and magnetic fields produced by the generation, transmission, and use of electric energy affects human health; carry out research, development, and demonstration with respect to technologies to mitigate any adverse human health effects; and provide for the collection, compilation, publication, and dissemination of scientifically valid information to the public on the following subjects: (a) possible human health effects of electric and magnetic fields; (b) the types and extent of human exposure to electric and magnetic fields in various occupational and residential settings; (c) technologies to measure and characterize electric and magnetic fields; and (d) methods to assess and manage exposure to electric and magnetic fields. The Department of Energy (DOE) is responsible for the overall administration of the 5-year, and $65 million EMF RAPID Program. The program will be jointly funded by both Federal non-Federal sources with non-Federal contributions accounting for at least 50% of the total funding.

  18. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    SciTech Connect (OSTI)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

  19. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

  20. Data Management Plan for the Environmental Restoration Program

    SciTech Connect (OSTI)

    Bryd, P.

    1994-01-01

    The purpose of this handbook is to assist environmental restoration (ER) projects in the preparation of a data management implementation plan (DMIP). The DMIP identifies and documents an ER project's requirements and responsibilities for the management, quality assurance, use, and archival of its environmental data. It is important that a project complete its DMIP in the early planning phase to ensure that the necessary and appropriate data management systems and personnel are in place before the project begins acquiring data. All ER projects that collect or use environmental data at the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Oak Ridge K-25 Site, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and surrounding onsite and offsite areas must prepare a DMIP. Project types that often collect environmental data include surveillance and maintenance, decontamination and decommissioning, remedial design/remedial action, and remedial investigation/feasibility studies. Even if a project does little environmental data management, a DMIP is required to document this fact.

  1. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    SciTech Connect (OSTI)

    Pava, Daniel S.

    2015-03-25

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) and integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.

  2. US-VISIT Identity Matching Algorithm Evaluation Program: ADIS Algorithm Evaluation Project Plan Update

    SciTech Connect (OSTI)

    Grant, C W; Lenderman, J S; Gansemer, J D

    2011-02-24

    This document is an update to the 'ADIS Algorithm Evaluation Project Plan' specified in the Statement of Work for the US-VISIT Identity Matching Algorithm Evaluation Program, as deliverable II.D.1. The original plan was delivered in August 2010. This document modifies the plan to reflect modified deliverables reflecting delays in obtaining a database refresh. This document describes the revised schedule of the program deliverables. The detailed description of the processes used, the statistical analysis processes and the results of the statistical analysis will be described fully in the program deliverables. The US-VISIT Identity Matching Algorithm Evaluation Program is work performed by Lawrence Livermore National Laboratory (LLNL) under IAA HSHQVT-07-X-00002 P00004 from the Department of Homeland Security (DHS).

  3. Monitored retrievable storage submission to Congress: Volume 3, Monitored retrievable storage program plan. [Contains glossary

    SciTech Connect (OSTI)

    1987-03-01

    This document presents the current DOE program objectives and the strategy for implementing the proposed program for the integral MRS facility. If the MRS proposal is approved by Congress, any needed revisions to the Program Plan will be made available to the Congress, the State of Tennessee, affected Indian tribes, local governments, other federal agencies, and the public. The proposal for constructing an MRS facility must include: the establishment of a federal program for the siting, development, construction, and operation of MRS facilities; a plan for funding the construction and operation of MRS facilities; site-specific designs, specifications, and cost estimates for the first such facility; a plan for integrating MRS facilities with other storage and disposal facilities authorized by the NWPA. 32 refs., 14 figs., 1 tab.

  4. Compressed air energy storage (CAES) environmental control concerns and program plan

    SciTech Connect (OSTI)

    Beckwith, M.A.; Boehm, D.W.

    1980-06-01

    This report assesses the required environmental research and recommends a program plan to assist DOD's Environmental Control Technology Division (ECT) in performing its mission of ensuring that the procedures, processes, systems, and strategies necessary to minimize any adverse environmental impacts of compressed air energy storage (CAES) are developed in a timely manner so as not to delay implementation of the technology. To do so, CAES technology and the expected major environmental concerns of the technology are described. Second, ongoing or planned research in related programs and the applicability of results from these programs to CAES environmental research are discussed. Third, the additional research and development required to provide the necessary environmental data base and resolve concerns in CAES are outlined. Finally, a program plan to carry out this research and development effort is presented.

  5. S-PRIME Thermionic Space Nuclear Power System Quality Assurance Program Plan

    SciTech Connect (OSTI)

    Jones, C.M.

    1992-09-23

    This Quality Assurance Program Plan (QAPP)describes how the Thermionic Space Nuclear Power System Design and Technology Demonstration Project addresses the Quality Assurance requirements delineated in DOE Order 5700.6C and the Thermionic Program Management Plan 214PMP000001. The Quality Assurance Program is based on the following fundamental principles, which Rocketdyne endorses and the QA Project Manager and Program Manager shall enforce: Quality Achievement is a continuing responsibility of line organization at all levels; the Quality Assurance organization through the effective overview of work, gives additional assurance that specified requirements are met; risk is the fundamental consideration in determining to what extent the Quality Assurance Plan should be applied to items and processes; action is based on facts and analysis, customer driven quality, strong quality leadership and continuous improvement.

  6. Planning under uncertainty solving large-scale stochastic linear programs

    SciTech Connect (OSTI)

    Infanger, G. . Dept. of Operations Research Technische Univ., Vienna . Inst. fuer Energiewirtschaft)

    1992-12-01

    For many practical problems, solutions obtained from deterministic models are unsatisfactory because they fail to hedge against certain contingencies that may occur in the future. Stochastic models address this shortcoming, but up to recently seemed to be intractable due to their size. Recent advances both in solution algorithms and in computer technology now allow us to solve important and general classes of practical stochastic problems. We show how large-scale stochastic linear programs can be efficiently solved by combining classical decomposition and Monte Carlo (importance) sampling techniques. We discuss the methodology for solving two-stage stochastic linear programs with recourse, present numerical results of large problems with numerous stochastic parameters, show how to efficiently implement the methodology on a parallel multi-computer and derive the theory for solving a general class of multi-stage problems with dependency of the stochastic parameters within a stage and between different stages.

  7. Tank waste remediation system privatization infrastructure program, configuration management implementation plan

    SciTech Connect (OSTI)

    Schaus, P.S.

    1998-08-18

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program`s products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control.

  8. Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

    SciTech Connect (OSTI)

    Carlsbad Field Office

    2001-01-31

    The Performance Demonstration Program (PDP) for nondestructive assay (NDA) consists of a series of tests to evaluate the capability for NDA of transuranic (TRU) waste throughout the Department of Energy (DOE) complex. Each test is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements obtained from NDA systems used to characterize the radiological constituents of TRU waste. The primary documents governing the conduct of the PDP are the Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC; DOE 1999a) and the Quality Assurance Program Document (QAPD; DOE 1999b). The WAC requires participation in the PDP; the PDP must comply with the QAPD and the WAC. The WAC contains technical and quality requirements for acceptable NDA. This plan implements the general requirements of the QAPD and applicable requirements of the WAC for the NDA PDP for boxed waste assay systems. Measurement facilities demonstrate acceptable performance by the successful testing of simulated waste containers according to the criteria set by this PDP Plan. Comparison among DOE measurement groups and commercial assay services is achieved by comparing the results of measurements on similar simulated waste containers reported by the different measurement facilities. These tests are used as an independent means to assess the performance of measurement groups regarding compliance with established quality assurance objectives (QAOs). Measurement facilities must analyze the simulated waste containers using the same procedures used for normal waste characterization activities. For the boxed waste PDP, a simulated waste container consists of a modified standard waste box (SWB) emplaced with radioactive standards and fabricated matrix inserts. An SWB is a waste box with ends designed specifically to fit the TRUPACT-II shipping container. SWBs will be used to package a substantial volume of the TRU waste for disposal. These PDP sample components

  9. Revised Master Plan for the Hood River Production Program, Technical Report 2008.

    SciTech Connect (OSTI)

    Oregon Department of Fish and Wildlife; Confederated Tribes of the Warm Springs Reservation

    2008-04-28

    The Hood River Production Program (HRPP) is a Bonneville Power Administration (BPA) funded program initiated as a mitigation measure for Columbia River hydrosystem effects on anadromous fish. The HRPP began in the early 1990s with the release of spring Chinook and winter steelhead smolts into the basin. Prior to implementation, co-managers, including the Confederated Tribes of the Warm Springs Reservation and the Oregon Department of Fish and Wildlife drafted the Hood River Production Master Plan (O'Toole and ODFW 1991a; O'Toole and ODFW 1991b) and the Pelton Ladder Master Plan (Smith and CTWSR 1991). Both documents were completed in 1991 and subsequently approved by the Council in 1992 and authorized through a BPA-led Environmental Impact Statement in 1996. In 2003, a 10-year programmatic review was conducted for BPA-funded programs in the Hood River (Underwood et al. 2003). The primary objective of the HRPP Review (Review) was to determine if program goals were being met, and if modifications to program activities would be necessary in order to meet or revise program goals. In 2003, an agreement was signed between PacifiCorp and resource managers to remove the Powerdale Dam (RM 10) and associated adult trapping facility by 2010. The HRPP program has been dependant on the adult trap to collect broodstock for the hatchery programs; therefore, upon the dam's removal, some sort of replacement for the trap would be needed to continue the HRPP. At the same time the Hood River Subbasin Plan (Coccoli 2004) was being written and prompted the co-managers to considered future direction of the program. This included revising the numerical adult fish objectives based on the assimilated data and output from several models run on the Hood River system. In response to the Review as well as the Subbasin Plan, and intensive monitoring and evaluation of the current program, the HRPP co-managers determined the spring Chinook program was not achieving the HRPP's defined smolt

  10. Wisconsin Power and Light Company's wind energy research and demonstration program

    SciTech Connect (OSTI)

    DeWinkel, C.C.

    1982-03-01

    Wisconsin Power and Light's (WPL) Wind Energy Test Program, encompasses the purchase and installation of six windmills which are or will be installed on customers' premises. These windmills (2 Windworks, 2 United Technologies, 1 Jay Carter and 1 Jacobs) vary in size from 10 to 20 Kilowatts (kw) with rotor diameters from 7 to 10 meters.

  11. DOE standard: Filter test facility quality program plan

    SciTech Connect (OSTI)

    1999-02-01

    This standard was developed primarily for application in US Department of Energy programs. It contains specific direction for HEPA filter testing performed at a DOE-accepted HEPA Filter Test Facility (FTF). Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve this document should be sent to the Office of Nuclear Safety Policy and Standards (EH-31), US Department of Energy, Washington, DC 20585, by letter or by using the self-addressed Document Improvement Proposal form (DOE F 1300.3) appearing at the end of this document.

  12. Roadmap for Nondestructive Evaluation of Reactor Pressure Vessel Research and Development by the Light Water Reactor Sustainability Program

    SciTech Connect (OSTI)

    Smith, Cyrus M; Nanstad, Randy K; Clayton, Dwight A; Matlack, Katie; Ramuhalli, Pradeep; Light, Glenn

    2012-09-01

    The Department of Energy s (DOE) Light Water Reactor Sustainability (LWRS) Program is a five year effort which works to develop the fundamental scientific basis to understand, predict, and measure changes in materials and systems, structure, and components as they age in environments associated with continued long-term operations of existing commercial nuclear power reactors. This year, the Materials Aging and Degradation (MAaD) Pathway of this program has placed emphasis on emerging Non-Destructive Evaluation (NDE) methods which support these objectives. DOE funded Research and Development (R&D) on emerging NDE techniques to support commercial nuclear reactor sustainability is expected to begin next year. This summer, the MAaD Pathway invited subject matter experts to participate in a series of workshops which developed the basis for the research plan of these DOE R&D NDE activities. This document presents the results of one of these workshops which are the DOE LWRS NDE R&D Roadmap for Reactor Pressure Vessels (RPV). These workshops made a substantial effort to coordinate the DOE NDE R&D with that already underway or planned by the Electric Power Research Institute (EPRI) and the Nuclear Regulatory Commission (NRC) through their representation at these workshops.

  13. DOE Science Showcase - Read about Energy-Efficient Lighting ...

    Office of Scientific and Technical Information (OSTI)

    Multi-Year Program Plan FY'09-FY'15 Solid-State Lighting Research and Development Novel Smart Windows Based on Transparent Phosphorescent OLEDs Illuminating Solar Decathlon Homes: ...

  14. Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.

    SciTech Connect (OSTI)

    Holland, Robert C.

    2005-09-01

    This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

  15. US country studies program: Support for climate change studies, national plans, and technology assessments

    SciTech Connect (OSTI)

    1996-12-31

    This paper describes the objectives of the next phase of the U.S. Country Studies Program which was launched in support of the Framework Convention on Climate Change (FCCC). The next phases of this program aim to: assist countries in preparing Climate Change Action plans; support technology assessments and development of technology initiatives; enhance exchange of information and expertise in support of FCCC. The program offers support for these processes in the form of handbooks which have been published to aid in preparing action plans, and to provide information on methane, forestry, and energy technologies. In addition an array of training workshops have been and are scheduled to offer hands on instruction to participants, expert advice is available from trained personnel, and modeling tools are available to aid in development of action plans.

  16. ENHANCED SEVERE TRANSIENT ANALYSIS FOR PREVENTION TECHNICAL PROGRAM PLAN

    SciTech Connect (OSTI)

    Gougar, Hans

    2014-09-01

    This document outlines the development of a high fidelity, best estimate nuclear power plant severe transient simulation capability that will complement or enhance the integral system codes historically used for licensing and analysis of severe accidents. As with other tools in the Risk Informed Safety Margin Characterization (RISMC) Toolkit, the ultimate user of Enhanced Severe Transient Analysis and Prevention (ESTAP) capability is the plant decision-maker; the deliverable to that customer is a modern, simulation-based safety analysis capability, applicable to a much broader class of safety issues than is traditional Light Water Reactor (LWR) licensing analysis. Currently, the RISMC pathway’s major emphasis is placed on developing RELAP-7, a next-generation safety analysis code, and on showing how to use RELAP-7 to analyze margin from a modern point of view: that is, by characterizing margin in terms of the probabilistic spectra of the “loads” applied to systems, structures, and components (SSCs), and the “capacity” of those SSCs to resist those loads without failing. The first objective of the ESTAP task, and the focus of one task of this effort, is to augment RELAP-7 analyses with user-selected multi-dimensional, multi-phase models of specific plant components to simulate complex phenomena that may lead to, or exacerbate, severe transients and core damage. Such phenomena include: coolant crossflow between PWR assemblies during a severe reactivity transient, stratified single or two-phase coolant flow in primary coolant piping, inhomogeneous mixing of emergency coolant water or boric acid with hot primary coolant, and water hammer. These are well-documented phenomena associated with plant transients but that are generally not captured in system codes. They are, however, generally limited to specific components, structures, and operating conditions. The second ESTAP task is to similarly augment a severe (post-core damage) accident integral analyses code

  17. Implementation Plan for the Office of Nuclear Energy Knowledge Management Program

    SciTech Connect (OSTI)

    Kimberlyn C. Mousseau

    2011-12-01

    The primary purpose of the Department of Energy (DOE), Office of Nuclear Energy (NE) Knowledge Management (KM) Program is to capture, share, disseminate, and ensure the ability to apply the knowledge created by the major nuclear energy Research and Development (R&D) programs. In support of the KM program, the Implementation Plan for the Office of NE KM Program outlines the knowledge management and distributed data environment that is required for its success. In addition to enumerating some strategic goals and objectives, this document characterizes the initial program and identifies computer-based areas of investment required for increased knowledge sharing and collaboration. It identifies and addresses investments already in existence and describes how these investments can be further enhanced and implemented to support a distributed KM program. The Idaho National Laboratory (INL) is leading the effort to identify and address these investments through the implementation of a distributed KM program that includes participants from ten of the major DOE national laboratories.

  18. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management`s operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  19. Savannah River Site Interim Waste Management Program Plan FY 1991--1992

    SciTech Connect (OSTI)

    Chavis, D.M.

    1992-05-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report of how Waste Management's operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year. In addition, this document projects activities for several years beyond the coming fiscal year in order to adequately plan for safe handling, storage, and disposal of radioactive wastes generated at the Savannah River Site and for developing technology for improved management of wastes. In this document, work descriptions and milestone schedules are current as of December 1991.

  20. Savannah River Site Waste Management Program Plan, FY 1993. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes.

  1. ARESE (ARM Enhanced Shortwave Experiment) Science Plan [Atmospheric Radiation Program

    SciTech Connect (OSTI)

    Valero, F.P.J.; Schwartz, S.E.; Cess, R.D.; Ramanathan, V.; Collins, W.D.; Minnis, P.; Ackerman, T.P.; Vitko, J.; Tooman, T.P.

    1995-09-27

    Several recent studies have indicated that cloudy atmospheres may absorb significantly more solar radiation than currently predicted by models. The magnitude of this excess atmospheric absorption, is about 50% more than currently predicted and would have major impact on our understanding of atmospheric heating. Incorporation of this excess heating into existing general circulation models also appears to ameliorate some significant shortcomings of these models, most notably a tendency to overpredict the amount of radiant energy going into the oceans and to underpredict the tropopause temperature. However, some earlier studies do not show this excess absorption and an underlying physical mechanism that would give rise to such absorption has yet to be defined. Given the importance of this issue, the Department of Energy's (DOE) Atmospheric Radiation Measurement (ARM) program is sponsoring the ARM Enhanced Shortwave Experiment (ARESE) to study the absorption of solar radiation by clear and cloudy atmospheres. The experimental results will be compared with model calculations. Measurements will be conducted using three aircraft platforms (ARM-UAV Egrett, NASA ER-2, and an instrumented Twin Otter), as well as satellites and the ARM central and extended facilities in North Central Oklahoma. The project will occur over a four week period beginning in late September, 1995. Spectral broadband, partial bandpass, and narrow bandpass (10nm) solar radiative fluxes will be measured at different altitudes and at the surface with the objective to determine directly the magnitude and spectral characteristics of the absorption of shortwave radiation by the atmosphere (clear and cloudy). Narrow spectral channels selected to coincide with absorption by liquid water and ice will help in identifying the process of absorption of radiation. Additionally, information such as water vapor profiles, aerosol optical depths, cloud structure and ozone profiles, needed to use as input in radiative

  2. Geothermal Technologies Program Multi-Year Research, Development and Demonstration Plan: Cover

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Geothermal Technologies Program 2009-2015 with program activities to 2025 Multi-Year Research, Development and Demonstration Plan Draft Clean, domestic, ubiquitous, renewable, baseload energy Cover Photo is Calpine's Sonoma Geothermal Plant at The Geysers feld in Northern California NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

  3. Section 2, Bioenergy Technologies Office Multi-Year Program Plan, March 2016

    Broader source: Energy.gov (indexed) [DOE]

    2-1 Last revised: March 2016 Section 2: Office Technology Research, Development, and Demonstration Plan The Bioenergy Technologies Office's research, development, and demonstration efforts are organized around four key technical and three key crosscutting program areas (see Figure 2-1). The first three technical program areas-Terrestrial Feedstock Supply and Logistics R&D, Advanced Algal Systems R&D, and Conversion R&D-focus on research and development (R&D). The fourth

  4. Waste Encapsulation and Storage Facility (WESF) Quality Assurance Program Plan (QAPP)

    SciTech Connect (OSTI)

    ROBINSON, P.A.

    2000-04-17

    This Quality Assurance Plan describes how the Waste Encapsulation and Storage Facility (WESF) implements the quality assurance (QA) requirements of the Quality Assurance Program Description (QAPD) (HNF-Mp-599) for Project Hanford activities and products. This QAPP also describes the organizational structure necessary to successfully implement the program. The QAPP provides a road map of applicable Project Hanford Management System Procedures, and facility specific procedures, that may be utilized by WESF to implement the requirements of the QAPD.

  5. Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Programs Planning to Do Evaluations Call Slides and Discussion Summary, August 2, 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    , 2012 Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Programs Planning to Do Evaluations Call Slides and Discussion Summary Agenda * Call Logistics and Attendance  Has you program conducted, or is it in the process of conducting or planning an evaluation? * Program Experience and Lessons:  Jane Peters , Research Into Action * Discussion:  Do you have clarifying questions or concerns about what was presented?  Are there parts of the coordination process

  6. Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration (MYRDD) Plan - Section 2.0: Program Benefits

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Benefits Multi-Year Research, Development and Demonstration Plan Page 2 - 1 2.0 Program Benefits Fuel cells provide power and heat cleanly and efficiently, using diverse domestic fuels, including hydrogen produced from renewable resources and biomass-based fuels. Fuel cells can be used in a wide range of stationary, transportation, and portable-power applications. Hydrogen can also function as an energy storage medium for renewable electricity. Hydrogen and fuel cell technologies are being

  7. Lighting

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration's (BPA) Energy Smart Industrial (ESI) program has partnered with Northwest public utilities and the Northwest Trade Ally Network to help industrial facilities...

  8. Industrial Technologies Program Research Plan for Energy-Intensive Process Industries

    SciTech Connect (OSTI)

    Chapas, Richard B.; Colwell, Jeffery A.

    2007-10-01

    In this plan, the Industrial Technologies Program (ITP) identifies the objectives of its cross-cutting strategy for conducting research in collaboration with industry and U.S. Department of Energy national laboratories to develop technologies that improve the efficiencies of energy-intensive process industries.

  9. Review of the Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure, May 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Independent Oversight Review of the Nevada National Security Site Criticality Safety Program Corrective Action Plan Closure May 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................ 1 2.0

  10. Characterization program management plan for Hanford K basin spent nuclear fuel

    SciTech Connect (OSTI)

    TRIMBLE, D.J.

    1999-07-19

    The program management plan for characterization of the K Basin spent nuclear fuel was revised to incorporate corrective actions in response to SNF Project QA surveillance 1K-FY-99-060. This revision of the SNF Characterization PMP replaces Duke Eng.

  11. Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan

    SciTech Connect (OSTI)

    Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

    2001-10-31

    This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

  12. Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan, Rev. 1

    SciTech Connect (OSTI)

    Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

    2001-12-10

    This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report.

  13. Vehicle Technologies Office: Multi-Year Program Plan 2011-2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Vehicle Technologies Office's multi-year program plan FY 2011-2015, outlines the scientific research and technology developments for the five-year timeframe (beyond the FY 2010 base year) that need to be undertaken to help meet the Administration'?s goals for reductions in oil consumption and carbon emissions from the ground transport vehicle sector of the economy.

  14. Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update

    SciTech Connect (OSTI)

    2014-11-01

    This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  15. Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update

    SciTech Connect (OSTI)

    none,

    2015-03-01

    This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  16. Bioenergy Technologies Office Multi-Year Program Plan: May 2013 Update

    Broader source: Energy.gov [DOE]

    This is the May 2013 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.

  17. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect (OSTI)

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  18. Overview of the US Department of Energy Light Water Reactor Sustainability Program

    SciTech Connect (OSTI)

    K. A. McCarthy; D. L. Williams; R. Reister

    2012-05-01

    The US Department of Energy Light Water Reactor Sustainability Program is focused on the long-term operation of US commercial power plants. It encompasses two facets of long-term operation: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the nuclear industry that support implementation of performance improvement technologies. An important aspect of the Light Water Reactor Sustainability Program is partnering with industry and the Nuclear Regulatory Commission to support and conduct the long-term research needed to inform major component refurbishment and replacement strategies, performance enhancements, plant license extensions, and age-related regulatory oversight decisions. The Department of Energy research, development, and demonstration role focuses on aging phenomena and issues that require long-term research and/or unique Department of Energy laboratory expertise and facilities and are applicable to all operating reactors. This paper gives an overview of the Department of Energy Light Water Reactor Sustainability Program, including vision, goals, and major deliverables.

  19. A Collaborative Approach to Transportation Planning: Federal and State Perspectives on Section 180(c) Program Development

    SciTech Connect (OSTI)

    Macaluso, C.; Strong, T.; Janairo, L.; Helvey, E.

    2006-07-01

    The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) committed in its November 2003 Strategic Plan for the Safe Transportation of Spent Nuclear Fuel and High-Level Radioactive Waste to Yucca Mountain: A Guide to Stakeholder Interactions to develop the transportation system collaboratively with stakeholders. The Strategic Plan further stated that four state regional groups (SRGs) would be the 'anchors' for OCRWM's collaboration with the states. The first major transportation planning activity that OCRWM initiated after publication of the Strategic Plan was the development of the Section 180(c) grant program. This document describes that collaboration and its outcomes from the perspective of the OCRWM participants and one of the SRGs, the Council of State Governments - Midwestern Office (CSG Midwest). (authors)

  20. Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory

    SciTech Connect (OSTI)

    Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.; Uziel, M.S.; Kleinhans, K.R.; Tiner, P.F.

    1994-08-01

    This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65. The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.

  1. Quality Assurance Plan for Heat Source/Radioisotope Thermoelectric Generator Programs

    SciTech Connect (OSTI)

    Gabriel, D. M.; Miller, G. D.; Bohne, W. A.

    1995-03-16

    The purpose of this document is to serve as the Quality Assurance Plan for Heat Source/Radioisotope Thermoelectric Generator (HS/RTG) programs performed at EG&G Mound Applied Technologies. As such, it identifies and describes the systems and activities in place to support the requirements contained in DOE Order 5700.6C as reflected in MD-10334, Mound Quality Policy and Responsibilities and the DOE/RPSD supplement, OSA/PQAR-1, Programmatic Quality Assurance Requirements for Space and Terrestrial Nuclear Power Systems. Unique program requirements, including additions, modifications, and exceptions to these quality requirements, are contained in the appendices of this plan. Additional appendices will be added as new programs and activities are added to Mound's HS/RTG mission assignment.

  2. Environment, Safety, Health, and Quality Plan for the Buried Waste Integrated Demonstration Program

    SciTech Connect (OSTI)

    Walker, S.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the US Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. This document describes the Environment, Safety, Health, and Quality requirements for conducting BWID activities at the Idaho National Engineering Laboratory. Topics discussed in this report, as they apply to BWID operations, include Federal, State of Idaho, and Environmental Protection Agency regulations, Health and Safety Plans, Quality Program Plans, Data Quality Objectives, and training and job hazard analysis. Finally, a discussion is given on CERCLA criteria and System and Performance audits as they apply to the BWID Program.

  3. Multi-Function Waste Tank Facility Quality Assurance Program Plan, Project W-236A. Revision 2

    SciTech Connect (OSTI)

    Hall, L.R.

    1995-05-30

    This document describes the Quality Assurance (QA) program for the Multi-Function Waste Tank Facility (MWTF) Project. The purpose of this QA program is to control project activities in such a manner as to achieve the mission of the MWTF Project in a safe and reliable manner. The QA program for the MWTF Project is founded on DOE Order 5700.6C, Quality Assurance, and implemented through the use of ASME NQA-1, Quality Assurance Program Requirements for Nuclear Facilities (ASME 1989 with addenda la-1989, lb-1991 and lc-1992). This document describes the program and planned actions which the Westinghouse Hanford Company (WHC) will implement to demonstrate and ensure that the project meets the requirements of DOE Order 5700.6C through the interpretive guidance of ASME NQA-1.

  4. Hood River Production Program : Hood River Fish Habitat Protection, Restoration, and Monitoring Plan.

    SciTech Connect (OSTI)

    Coccoli, Holly; Lambert, Michael

    2000-02-01

    Effective habitat protection and rehabilitation are essential to the long-term recovery of anadromous fish populations in the Hood River subbasin. This Habitat Protection, Restoration, and Monitoring Plan was prepared to advance the goals of the Hood River Production Program (HRRP) which include restoring self-sustaining runs of spring chinook salmon and winter and summer steelhead. The HRPP is a fish supplementation and monitoring and evaluation program initiated in 1991 and funded by the Bonneville Power Administration (BPA) as part of the Northwest Power Planning Council Fish and Wildlife Program. The HRPP is a joint effort of the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO) and Oregon Department of Fish and Wildlife (ODFW). Using recent watershed assessment and federal watershed analysis reports, this Plan reviews the historic and current condition of riparian, instream and upland habitats; natural watershed processes; anadromous and resident fish populations; identifies limiting factors, and indicates those subbasin areas that need protection or are likely to respond to restoration. Primary habitat restoration needs were identified as (1) improved fish screening and upstream adult passage at water diversions; (2) improved spawning gravel availability, instream habitat structure and diversity; and (3) improved water quality and riparian conditions. While several early action projects have been initiated in the Hood River subbasin since the mid 1990s, this Plan outlines additional projects and strategies needed to protect existing high quality habitat, correct known fish survival problems, and improve the habitat capacity for natural production to meet HRPP goals.

  5. ORNL long-range environmental and waste management plan: Program overview and summary

    SciTech Connect (OSTI)

    Bates, L.D.; Berry, J.B.; Butterworth, G.E.; du Mont, S.P.; Easterday, C.A.; Geisler, A.H.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Pudelek, R.E.; Rohwer, P.S.; Scanlan, T.F.; Stratton, L.E.; Trabalka, J.R.; Youngblood, E.L.

    1988-04-01

    The primary purpose of this report is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The docuemnt also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document: it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) Management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. The near-term (one to three years) part of the plan is a realistic assessment of the current program and ongoing capital projects and reflects the efforts preceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. Beyond the immediate time frame, the document reflects the strategy and the project and funding estimates as a snapshot at the time of publication. Annual revision will reflect the continuing evoltuion and development of environmental and waste management processes, characterizations, remedial actions, regulations, an strategies for the establishment and conduct of a comprehensive environmental and waste management program. 15 figs., 10 tabs.

  6. Characterization Program Management Plan for Hanford K Basin Spent Nuclear Fuel (SNF) (OCRWM)

    SciTech Connect (OSTI)

    BAKER, R.B.; TRIMBLE, D.J.

    2000-12-12

    The management plan developed to characterize the K Basin spent nuclear fuel (SNF) and sludge was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the SNF stored at the Hanford K Basins. The plan also addressed necessary characterization for the removal, transport, and storage of the sludge from the Hanford K Basins. This plan was revised in 1999 (i.e., Revision 2) to incorporate actions necessary to respond to the deficiencies revealed as the result of Quality Assurance surveillances and audits in 1999 with respect to the fuel characterization activities. Revision 3 to this Program Management Plan responds to a Worker Assessment resolution determined in Fical Year 2000. This revision includes an update to current organizational structures and other revisions needed to keep this management plan consistent with the current project scope. The plan continues to address both the SNF and the sludge accumulated at K Basins. Most activities for the characterization of the SNF have been completed. Data validation, Office of Civilian Radioactive Waste Management (OCRWM) document reviews, and OCRWM data qualification are the remaining SNF characterization activities. The transport and storage of K Basin sludge are affected by recent path forward revisions. These revisions require additional laboratory analyses of the sludge to complete the acquisition of required supporting engineering data. Hence, this revision of the management plan provides the overall work control for these remaining SNF and sludge characterization activities given the current organizational structure of the SNF Project.

  7. Project planning workshop 6-GeV synchrotron light source: Volume 2

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    A series of work sheets, graphs, and printouts are given which detail the work breakdown structure, cost, and manpower requirements for the 6 GeV Synchrotron Light Source. (LEW)

  8. Atmospheric Radiation Measurement Program Science Plan. Current Status and Future Directions of the ARM Science Program

    SciTech Connect (OSTI)

    Ackerman, Thomas P.; Del Genio, Anthony D.; Ellingson, Robert G.; Ferrare, Richard A.; Klein, Steve A.; McFarquhar, Gregory M.; Lamb, Peter J.; Long, Charles M.; Verlinde, Johannes

    2004-10-30

    The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative transfer, aerosol science, determination of cloud properties, cloud modeling, and cloud parameterization testing and development. The focus of ARM science has naturally shifted during the last few years to an increasing emphasis on modeling and parameterization studies to take advantage of the long time series of data now available. During the next 5 years, the principal focus of the ARM science program will be to: Maintain the data record at the fixed ARM sites for at least the next five years; Improve significantly our understanding of and ability to parameterize the 3-D cloud-radiation problem at scales from the local atmospheric column to the global climate model (GCM) grid square; Continue developing techniques to retrieve the properties of all clouds, with a special focus on ice clouds and mixed-phase clouds; Develop a focused research effort on the indirect aerosol problem that spans observations, physical models, and climate model parameterizations; Implement and evaluate an operational methodology to calculate broad-band heating rates in the atmospheric columns at the ARM sites; Develop and implement methodologies to use ARM data more effectively to test atmospheric models, both at the cloud-resolving model scale and the GCM scale; and, Use these methodologies to diagnose cloud parameterization performance and then refine these parameterizations to improve the accuracy of climate model simulations. In addition, the ARM Program is actively developing a new ARM Mobile Facility (AMF) that will be available for short deployments (several months to a year or more) in climatically important regions. The AMF will have much of the same instrumentation as the remote

  9. Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program

    SciTech Connect (OSTI)

    N /A

    2009-04-01

    Each testing and analytical facility performing waste characterization activities for the Waste Isolation Pilot Plant (WIPP) participates in the Performance Demonstration Program (PDP) to comply with the Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC) (DOE/WIPP-02-3122) and the Quality Assurance Program Document (QAPD) (CBFO-94-1012). The PDP serves as a quality control check for data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed to each of the facilities participating in the PDP. The PDP evaluates analyses of simulated headspace gases, constituents of the Resource Conservation and Recovery Act (RCRA), and transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques.

  10. Performance Demonstration Program Plan for Nondestructive Assay of Boxed Wastes for the TRU Waste Characterization Program

    SciTech Connect (OSTI)

    None, None

    2009-10-01

    Each testing and analytical facility performing waste characterization activities for the Waste Isolation Pilot Plant (WIPP) participates in the Performance Demonstration Program (PDP) to comply with the Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC) (DOE/WIPP-02-3122) and the Quality Assurance Program Document (QAPD) (CBFO-94-1012). The PDP serves as a quality control check for data generated in the characterization of waste destined for WIPP. Single-blind audit samples are prepared and distributed to each of the facilities participating in the PDP. Different PDPs evaluate the analyses of simulated headspace gases (HSGs), constituents of the Resource Conservation and Recovery Act (RCRA), and transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques.

  11. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

  12. Quality assurance program plan for the Site Physical and Electrical Calibration Services Lab. Revision 1

    SciTech Connect (OSTI)

    Carpenter, C.A.

    1995-03-02

    This Quality Assurance Program Plan (QAPP) is organized to address WHC`s implementation of quality assurance requirements as they are presented as interpretive guidance endorsed by the Department of Energy (DOE) Field Office, Richland DOE Order 5700.6C Quality Assurance. The quality assurance requirements presented in this plan will assure Measuring and Test Equipment (M and TE) are in conformance with prescribed technical requirements and that data provided by testing, inspection, or maintenance are valid. This QAPP covers all activities and work elements that are variously called QA, quality control, and quality engineering regardless of the organization performing the work. This QAPP identifies the QA requirements for planning, control, and documentation of operations, modifications, and maintenance of the WHC Site Physical and Electrical Calibration Services Laboratory. The primary function of the WHC Site Physical and Electrical Calibration Services Laboratory is providing calibration, standardization, or repair service of M and TE.

  13. Fire protection program fiscal year 1997 site support program plan - Hanford fire department

    SciTech Connect (OSTI)

    Good, D.E., Westinghouse Hanford

    1996-07-01

    The mission of the Hanford Fires Department (HFD) is to support the safe and timely cleanup of the Hanford Site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating situations which could threaten the operations, employees, or interest of the US Department of Energy operated Hanford Site. this includes response to surrounding fire department districts under mutual aids agreements and contractual fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site. the fire department also provides site fire marshal overview authority, fire system testing, and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention and education.

  14. A technology transfer plan for the US Department of Energy's Electric Energy Systems Program

    SciTech Connect (OSTI)

    Harrer, B.J.; Hurwitch, J.W.; Davis, L.J.

    1986-11-01

    The major objective of this study was to develop a technology transfer plan that would be both practical and effective in promoting the transfer of the products of DOE/EES research to appropriate target audiences. The study drew upon several major components of the marketing process in developing this plan: definition/charcterization of the products being produced by the DOE/EES program, identification/characterization of possible users of the products being produced by the program, and documentation/analysis of the methods currently being used to promote the adoption of DOE/EES products. Fields covered include HVDC, new materials, superconductors, electric field effects, EMP impacts, battery storage/load leveling, automation/processing concepts, normal/emergency operating concepts, Hawaii deep water cable, and failure mechanisms.

  15. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    SciTech Connect (OSTI)

    Harmon, Harry D.

    2000-11-30

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA) to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  16. Tanks Focus Area Alternative Salt Processing Research and Development Program Plan

    SciTech Connect (OSTI)

    Harmon, Harry D.

    2000-05-15

    In March 2000, DOE-Headquarters (HQ) requested the Tanks Focus Area (TFA)to assume management responsibility for the Salt Processing Project technology development program at Savannah River Site. The TFA was requested to conduct several activities, including review and revision of the technology development roadmaps, development of down-selection criteria, and preparation of a comprehensive Research and Development (R&D) Program Plan for three candidate cesium removal technologies, as well as the Alpha and strontium removal processes that must also be carried out. The three cesium removal candidate technologies are Crystalline Silicotitanate (CST) Non-Elutable Ion Exchange, Caustic Side Solvent Extraction (CSSX), and Small Tank Tetraphenylborate Precipitation (STTP). This plan describes the technology development needs for each process that must be satisfied in order to reach a down-selection decision, as well as continuing technology development required to support conceptual design activities.

  17. Chemical Reactivity Testing for the National Spent Nuclear Fuel Program. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Newsom, H.C.

    1999-01-24

    This quality assurance project plan (QAPjP) summarizes requirements used by Lockheed Martin Energy Systems, Incorporated (LMES) Development Division at Y-12 for conducting chemical reactivity testing of Department of Energy (DOE) owned spent nuclear fuel, sponsored by the National Spent Nuclear Fuel Program (NSNFP). The requirements are based on the NSNFP Statement of Work PRO-007 (Statement of Work for Laboratory Determination of Uranium Hydride Oxidation Reaction Kinetics.) This QAPjP will utilize the quality assurance program at Y-12, QA-101PD, revision 1, and existing implementing procedures for the most part in meeting the NSNFP Statement of Work PRO-007 requirements, exceptions will be noted.

  18. Roadmap for Nondestructive Evaluation of Reactor Pressure Vessel Research and Development by the Light Water Reactor Sustainability Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy’s (DOE’s) Light Water Reactor Sustainability (LWRS) Program is a five year effort that works to develop the fundamental scientific basis to understand, predict, and measure...

  19. Quality assurance plan for the Basic Environmental Compliance and Monitoring Program (BECAMP). Revision 1

    SciTech Connect (OSTI)

    Essington, E.H.

    1993-11-01

    This quality assurance plan (QAP) is designed ensure that the methodologies and the data used for environmental cleanup and treatment studies at the Nevada Test Site are both usable and defensible. The QAP serves two purposes in this regard: (1) to guide the preparation of procedures for carrying out the tasks of the Basic Environmental compliance and Monitoring program (BECAMP); and (2) to help management track the progress of those tasks.

  20. Characterization program management plan for Hanford K Basin spent nuclear fuel

    SciTech Connect (OSTI)

    Lawrence, L.A.

    1998-05-14

    The management plan developed to characterize the K Basin Spent Nuclear Fuel was revised to incorporate actions necessary to comply with the Office of Civilian Radioactive Waste Management Quality Assurance Requirements Document 0333P. This plan was originally developed for Westinghouse Hanford Company and Pacific Northwest National Laboratory to work together on a program to provide characterization data to support removal, conditioning, and subsequent dry storage of the spent nuclear fuels stored at the Hanford K Basins. This revision to the Program Management Plan replaces Westinghouse Hanford Company with Duke Engineering and Services Hanford, Inc., updates the various activities where necessary, and expands the Quality Assurance requirements to meet the applicable requirements document. Characterization will continue to utilize the expertise and capabilities of both organizations to support the Spent Nuclear Fuels Project goals and objectives. This Management Plan defines the structure and establishes the roles for the participants providing the framework for Duke Engineering and Services Hanford, Inc. and Pacific Northwest National Laboratory to support the Spent Nuclear Fuels Project at Hanford.