Powered by Deep Web Technologies
Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Updates available at: http://www.nuclear.gov NEXT UPDATE - October 2012 Page 1 News Updates  The final ruling on the design certification for Mitsubishi Heavy Industries' APWR has been revised until 2015. Structural changes were made to the design by vendor, which requires a new seismic analysis to be performed. Because of this, the review schedule for the COL applications for Comanche Peak and North Anna has been delayed by approximately 18 months.  The final ruling on Areva's EPR design certification has been revised from June 2013 until the end of 2014. The change is to allow Areva to

2

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Updates available at: http://www.nuclear.gov NEXT UPDATE - April 2013 Page 1 News Updates  On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013.  On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

3

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

fuel. The EIS and rule are to be completed within 24 months. Due to low natural gas prices and unfavorable economic conditions, Exelon has withdrawn its application for...

4

COL Application Content Guide for HTGRs: Revision to RG 1.206, Part 1 - Status Report  

SciTech Connect

A combined license (COL) application is required by the Nuclear Regulatory Commission (NRC) for all proposed nuclear plants. The information requirements for a COL application are set forth in 10 CFR 52.79, Contents of Applications; Technical Information in Final Safety Analysis Report. An applicant for a modular high temperature gas-cooled reactor (HTGR) must develop and submit for NRC review and approval a COL application which conforms to these requirements. The technical information necessary to allow NRC staff to evaluate a COL application and resolve all safety issues related to a proposed nuclear plant is detailed and comprehensive. To this, Regulatory Guide (RG) 1.206, Combined License Applications for Nuclear Power Plants (LWR Edition), was developed to assist light water reactor (LWR) applicants in incorporating and effectively formatting required information for COL application review (Ref. 1). However, the guidance prescribed in RG 1.206 presumes a LWR design proposal consistent with the systems and functions associated with large LWR power plants currently operating under NRC license.

Wayne Moe

2012-08-01T23:59:59.000Z

5

License Application Guidelines  

market, and describe how the funding will be obtained. LICENSE APPLICATION GUIDELINES 6. ... Key events that have led to your companys current position in the

6

License Renewal Application PREFACE  

E-Print Network (OSTI)

The following describes the information location, layout, and editorial conventions in the Beaver Valley Power Station (BVPS) License Renewal Application (hereinafter referred to as this application or the application). Abbreviated names and acronyms used throughout the application are defined at the end of this preface. Commonly understood terms (such as U.S.) and terms used only in referenced document numbers may not be identified in this table. Regulatory documents such as NUREG-1801, Generic Aging Lessons Learned (GALL) Report,

Beaver Valley; Power Station

2007-01-01T23:59:59.000Z

7

Review of export license applications (Strategic Trade Control...  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing Nonproliferation & National Security (NPNS) Overview Technical Nonproliferation Policy Support Strategic Trade Control Review of export license applications Multilateral...

8

Property:FERC License Application Date | Open Energy Information  

Open Energy Info (EERE)

Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicenseApplicationDate&oldid610687...

9

Combined Operating License Model Program Plan  

Science Conference Proceedings (OSTI)

The Model Program Plan (MPP) provides functional guidance on how to prepare a Combined Operating License (COL) application for a new nuclear power facility when incorporating previous findings from both design certification (DC) and an early site permit (ESP) proceedings. The plan identifies the activities necessary to prepare an application and provides guidance on planning and managing a COL program, including working with DC and ESP holders and using subcontracted resources to develop necessary new in...

2003-11-17T23:59:59.000Z

10

DOE Announces Yucca Mountain License Application Schedule | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Yucca Mountain License Application Schedule Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative changes are enacted, the repository will be able to accept spent nuclear fuel and high-level waste starting in early 2017. Announcing a schedule for submitting a license application is another step in the Department's mission to provide stability, clarity and predictability in moving the Yucca Mountain Project forward as quickly as

11

For The Calvert Cliffs Combined License Application  

E-Print Network (OSTI)

The purpose of this letter is to respond to the requests for additional information (RAIs) identified in the NRC letter to UniStar dated February 3, 2009 (Reference 1). The RAIs address figures needed to publish the environmental impact statement (EIS) and information necessary for completion of regulatory reviews. UniStar Regulatory Affairs staff, UniStar vendors for the Calvert Cliffs Nuclear Power Plant Unit 3 (CCNPP3) project, NRC headquarters staff, and NRC contractors supporting review of the CCNPP3 Combined License Application (COLA) environmental report discussed the scope of the RAIs (Reference 1) during four telephone conferences on February 13, 18, 19, and 24. The discussions focused on how UniStar can provide the NRC with graphics needed to develop the CCNPP3 Draft EIS and necessary additional details of environmental reviews performed by UniStar. The telephone conferences resulted in a common understanding of the NRC requests and how UniStar can provide the needed information (Reference 2).UN#09-1140 Page 2 of 2 The NRC staff agreed that certain information regarding alternate sites is available in the

unknown authors

2009-01-01T23:59:59.000Z

12

Successful Clean Coal Technology Licensed for Commercial Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Successful Clean Coal Technology Licensed for Commercial Successful Clean Coal Technology Licensed for Commercial Application Successful Clean Coal Technology Licensed for Commercial Application July 26, 2010 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH™) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

13

NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

Mark Holbrook

2010-09-01T23:59:59.000Z

14

DOE Marks Milestone in Submitting Yucca Mountain License Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks Milestone in Submitting Yucca Mountain License Marks Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page application describes DOE's plan to safely isolate spent nuclear fuel and high-level radioactive waste in tunnels deep underground at Yucca Mountain, a remote ridge on federally controlled land in the Mojave Desert 90 miles northwest of Las Vegas. Currently, the waste is stored at 121 temporary locations in 39 states

15

REVIEWS FOR IN SITU LEACH URANIUM EXTRACTION LICENSE APPLICATIONS  

E-Print Network (OSTI)

Review Plan (NUREG1569) which provides guidance for staff reviews of applications to develop and operate uranium in situ leach facilities. Under the provisions of Title 10 of the Code of Federal Regulations, Part 40 (10 CFR Part 40), Domestic Licensing of Source Material, an NRC Materials License is required to conduct uranium recovery by in situ leach extraction techniques. Applicants for a new license and operators seeking an amendment or renewal of an existing license are required to provided detailed information on the facilities, equipment, and procedures used in the proposed activities. In addition, the applicant for a new license also provides an Environmental Report that discusses the effects of proposed operations on the health and safety of the public and assesses impacts to the environment. For amendment or renewal of an existing license, the original Environmental Report is supplemented, as necessary. This information is used by the NRC staff to determine whether the proposed activities will be protective of public health and safety and the environment and to fulfill NRC responsibilities under the National Environmental Policy Act (NEPA). The purpose of the Standard Review Plan (NUREG1569) is to provide the NRC staff with guidance on performing reviews of information provided by the applicant, and to ensure a consistent quality and

In Situ; Leach Uranium; In Situ; Leach Uranium; J. Lusher

2003-01-01T23:59:59.000Z

16

Licensed reactor nuclear safety criteria applicable to DOE reactors  

SciTech Connect

This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards.

Not Available

1993-11-01T23:59:59.000Z

17

Licensed reactor nuclear safety criteria applicable to DOE reactors  

SciTech Connect

The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC (Nuclear Regulatory Commission) licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor.

Not Available

1991-04-01T23:59:59.000Z

18

License  

E-Print Network (OSTI)

EWF is short for Expert Witness Compression Format, according to [ASR02]. It is a file type used to store media images for forensic purposes. It is currently widely used in the field of computer forensics in proprietary tooling like EnCase en FTK. The original specification of the format is provided by ASRDATA, for the SMART application. This document is intended as a working document for the EWF specification. Which should allow existing Open Source forensic tooling to be able to process this file type. page iDocument information Author(s):

Joachim Metz; Joachim Metz

2006-01-01T23:59:59.000Z

19

Duke Power Company LLC d/b/a Duke Energy Carolinas, LLC Amended Response to RIS 2007-08, Updated Licensing Submittal Information to Support the Design-Centered Licensing Review Approach  

E-Print Network (OSTI)

requested the submittal of updated information regarding combined license (COL) applications for new reactors. In Enclosure 1 to that letter, and in response to question 3(a) of RIS 2007-08, Duke indicated its planning basis reflected an intent to submit the William States Lee III (Lee Nuclear) COL application at approximately the same time as the AP1000 reference plant (R-COL) application in late October 2007. Duke also committed to communicate promptly to the NRC Staff any changes to this planning basis approximately 90 days prior to the application submittal date. In consultation with NuStart, Duke believes it prudent to avoid potential interference between the R-COL application acceptance review and any subsequent (S-COL) application (such as Duke's). Duke and NuStart believe that staggering these applications slightly will ensure more efficient and effective interactions during both R-COL and S-COL acceptance reviews. Accordingly, Duke hereby amends its response to question 3(a) of RIS 2007-08, and intends to submit the Lee Nuclear COL application by mid-December 2007.

Bryan J. Dolan

2007-01-01T23:59:59.000Z

20

Total System Performance Assessment - License Application Methods and Approach  

Science Conference Proceedings (OSTI)

''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

J. McNeish

2003-12-08T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Total System Performance Assessment-License Application Methods and Approach  

SciTech Connect

''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

J. McNeish

2002-09-13T23:59:59.000Z

22

License Application Design Selection Report, REV 01. August 1999  

Science Conference Proceedings (OSTI)

In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II, these enhanced design alternatives were refined, screened for accepatable postclosure performance, and evaluated against a set of criteria addressing four broad aspects of the repository: performance demonstrability; flexibility; construction, operations and maintenance; and cost. Based on this evaluation, a conceptual design was recommended to DOE and could be characterized as a low thermal impact design. Included in the report is more in depth information regarding the basis of the recommendation, performance issues, benefits related to reduced uncertainties, construction/operational benefits, technical and programmatic flexibilty and cost impacts.

Hastings, C.R.

1999-08-30T23:59:59.000Z

23

UPDATE TO THE YUCCA MOUNTAIN REPOSITORY LICENSE APPLICATION  

E-Print Network (OSTI)

The purpose of this letter is to transmit the U.S. Department of Energy's (DOE) first update to the Yucca Mountain Repository LA, which meets the requirements of 10 CFR 63.22(c) to update the application on notification of the appointment of an Atomic Safety and Licensing Board. DOE initially transmitted its LA for construction authorization to the U.S. Nuclear Regulatory Commission (NRC) on June 3, 2008. In accordance with 10 CFR 63.22(e), DOE certifies that this revision reflects the updated LA as of October 16, 2008. Changes made to this revision were determined not to be significant and did not impact the conclusions of the LA. The update was initiated soon after the docketing of the LA by the NRC in anticipation of notification of the appointment of an Atomic Safety and Licensing Board. Due to the lengthy process required to maintain configuration control between the paper version and the electronic version, and the time required to print the paper version, DOE is submitting the update prepared as of that time. Enclosed are optical storage media which contain: 1) the first update of the LA, with revised sections clearly identified as Revision 1, and text and figure changes noted with marginal change bars; and 2) updates to the primary reference documents to the LA, affecting 36 of the original 196 references. In addition, enclosed in paper format are: 1) a detailed listing of the contents of the optical storage media submitted with this letter; 2) a summary of the specific LA changes that have been made, including the sections revised and a description of each change; and 3) copies of the individual LA pages affected by changes since the June 3, 2008, submittal. The updates to the primary reference

Michael F. Weber

2009-01-01T23:59:59.000Z

24

UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO  

Office of Legacy Management (LM)

OF AMERICA OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO TRANSFER,DELIVER,EXPORT,OR RECEIVE URANIUM ORTHORIUM SOURCE MATERIAL Pursuant to Code of Federal Regulations. Title II- Atomic Energy. Part IO-Control of Source Material Form approved Budget Bureau No. 3%RO02.2. 2. PREVIOUS AEC LICENSE NUMBER, IF ANY. R-103 _..._............_.~_~~......~~~.....~.. INSTRUCTIONS File two (2) copies of this application with the U. S. Atomic Energy Commission, P. 0. Box 30, Ansonia Station, New York 23, N. Y. This application may be used for an original license or for the renewal of a license. In the case of a rrnewal, this application should be received by the Commission on or before 30 days before the expiration of the previous license. Complete blocks 1, 2, 3, 9. and if

25

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2  

SciTech Connect

NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

1996-02-01T23:59:59.000Z

26

Seismic Analysis Issues in Design Certification Applications for New Reactors  

SciTech Connect

The licensing framework established by the U.S. Nuclear Regulatory Commission under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants, provides requirements for standard design certifications (DCs) and combined license (COL) applications. The intent of this process is the early reso- lution of safety issues at the DC application stage. Subsequent COL applications may incorporate a DC by reference. Thus, the COL review will not reconsider safety issues resolved during the DC process. However, a COL application that incorporates a DC by reference must demonstrate that relevant site-specific de- sign parameters are within the bounds postulated by the DC, and any departures from the DC need to be justified. This paper provides an overview of several seismic analysis issues encountered during a review of recent DC applications under the 10 CFR Part 52 process, in which the authors have participated as part of the safety review effort.

Miranda, M.; Morante, R.; Xu, J.

2011-07-17T23:59:59.000Z

27

Structural Design Challenges in Design Certification Applications for New Reactors  

SciTech Connect

The licensing framework established by the U.S. Nuclear Regulatory Commission under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants, provides requirements for standard design certifications (DCs) and combined license (COL) applications. The intent of this process is the early reso- lution of safety issues at the DC application stage. Subsequent COL applications may incorporate a DC by reference. Thus, the COL review will not reconsider safety issues resolved during the DC process. However, a COL application that incorporates a DC by reference must demonstrate that relevant site-specific de- sign parameters are confined within the bounds postulated by the DC, and any departures from the DC need to be justified. This paper provides an overview of structural design chal- lenges encountered in recent DC applications under the 10 CFR Part 52 process, in which the authors have participated as part of the safety review effort.

Miranda, M.; Braverman, J.; Wei, X.; Hofmayer, C.; Xu, J.

2011-07-17T23:59:59.000Z

28

Burnup Credit Approach Used in the Yucca Mountain License Application  

SciTech Connect

The United States Department of Energy has submitted a license application (LA) for construction authorization of a deep geologic repository at Yucca Mountain, Nevada. The license application is currently under review by the United States Nuclear Regulatory Commission (NRC). This paper will describe the methodology and approach used in the LA to address the issue of criticality and the role of burnup credit during the postclosure period. The most significant and effective measures for prevention of criticality in the repository include multiple redundant barriers that act to isolate fissionable material from water (which can act as a moderator, corrosive agent, and transporter of fissile material); inherent geometry of waste package internals and waste forms; presence of fixed neutron absorbers in waste package internals; and fuel burnup for commercial spent nuclear fuel. A probabilistic approach has been used to screen criticality from the total system performance assessment. Within the probabilistic approach, criticality is considered an event, and the total probability of a criticality event occurring within 10,000 years of disposal is calculated and compared against the regulatory criterion. The total probability of criticality includes contributions associated with both internal (within waste packages) and external (external to waste packages) criticality for each of the initiating events that could lead to waste package breach. The occurrence of and conditions necessary for criticality in the repository have been thoroughly evaluated using a comprehensive range of parameter distributions. A simplified design-basis modeling approach has been used to evaluate the probability of criticality by using numerous significant and conservative assumptions. Burnup credit is used only for evaluations of in-package configurations and uses a combination of conservative and bounding modeling approximations to ensure conservatism. This paper will review the NRC regulatory criteria relevant to postclosure criticality, explain the role of criticality within the overall repository performance assessment, describe the strategy for preventing criticality via design features and waste form properties, and discuss the numerous considerations relevant to criticality and burnup credit for spent nuclear fuel disposed of in a geologic repository, with emphasis on the burnup credit approach and analyses.

Scaglione, John M [ORNL; Wagner, John C [ORNL

2010-01-01T23:59:59.000Z

29

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1  

Science Conference Proceedings (OSTI)

NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

NONE

1996-02-01T23:59:59.000Z

30

Negotiable Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Negotiable Licensing Negotiable Licensing Negotiable Licenses LANL's significant portfolio of intellectual property (patents, copyrights, and trademarks) primarily results from federally-sponsored research and development in support of the Laboratory's national security mission. Also, we collaborate with industry to develop innovative, application-specific technology to further our partner's ultimate commercialization objectives. In each case, we develop valuable technology that provides benefit to both the public and private sectors, the majority of which is available for commercial licensing. To ensure that our partners have the necessary intellectual property advantage to successfully deploy LANL technology, we offer a variety of negotiable commercial license agreements that can be tailored to suit specific market

31

License Agreements  

Science Conference Proceedings (OSTI)

Standard Reference Database NIST 23 REFPROP License Information. Single Location License. A single location license ...

2013-05-06T23:59:59.000Z

32

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program: Combined Construction and Operating Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

33

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power 2010 Program: Combined Construction and Operating Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

34

Preparing to Submit a License Application for Yucca Mountain  

Science Conference Proceedings (OSTI)

In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region of the United States, approximately 100 miles (160 kilometers) northwest of Las Vegas (Figure 1). The location is remote from population centers, and there are no permanent residents within approximately 14 miles (23 km) of the site. Overall, Nye County has a population density of about two persons per square mile (two persons per 2.5 square km); in the vicinity of Yucca Mountain, it is significantly less. Yucca Mountain is a series of north-south-trending ridges extending approximately 25 miles (40 km), and consists of successive layers of fine-grained volcanic tuffs, millions of years old, underlain by older carbonate rocks. The alternating layers of welded and nonwelded volcanic tuffs have differing hydrologic properties that significantly impact the manner in which water moves through the mountain. The repository horizon will be in welded tuff located in the unsaturated zone, more than 1,000 feet (300 meters) above the water table in the present-day climate, and is expected to remain well above the water table during wetter future climate conditions. Future meteorology and climatology at Yucca Mountain are important elements in understanding the amount of water available to potentially interact with the waste.

W.J. Arthur; M.D. Voegele

2005-03-14T23:59:59.000Z

35

Part 70 License NRC Docket No. 70-07018 Subject: References: SUPPLEMENT TO APPLICATION FOR A SPECIAL NUCLEAR MATERIAL LICENSE FOR WATTS BAR NUCLEAR PLANT UNIT 2 IN ACCORDANCE  

E-Print Network (OSTI)

(TAC NO. ME0853)" As part of TVA's application for a Special Nuclear Material (SNM) License for Watts Bar Unit 2

Watts Bar; Nuclear Plant; Watts Bar; Nuclear Plant

2009-01-01T23:59:59.000Z

36

Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository  

SciTech Connect

If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required for a construction authorization. The LA must also support a licensing proceeding before an Atomic Safety and Licensing Board panel prior to NRC action on any decision to authorize construction. The DOE has established a strategic basis for planning that is intended to provide the framework for development of an integrated plan for activities leading to preparation and submittal of a LA.

Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

2002-02-26T23:59:59.000Z

37

The Standard Review Plan for Review of License Renewal Applications for Nuclear Power  

E-Print Network (OSTI)

Plants (SRP-LR) provides guidance to Nuclear Regulatory Commission staff reviewers in the Office of Nuclear Reactor Regulation. These reviewers perform safety reviews of applications to renew nuclear power plant licenses in accordance with Title 10 of the Code of Federal Regulations Part 54. The principal purposes of the SRP-LR are to ensure the quality and uniformity of staff reviews and to present a well-defined base from which to evaluate applicant programs and activities for the period of extended operation. The SRP-LR is also intended to make information about regulatory matters widely available, to enhance communication with interested members of the public and the nuclear power industry, and to improve public and industry understanding of the staff review process. The safety review is based primarily on the information provided by the applicant in a license renewal application. Each of the individual SRP-LR sections addresses (1) who performs the review, (2) the matters that are reviewed, (3) the basis for review, (4) the way the review is accomplished, and (5) the conclusions that are sought.

Power Plants

2005-01-01T23:59:59.000Z

38

Model tracking system for low-level radioactive waste disposal facilities: License application interrogatories and responses  

SciTech Connect

This report describes a model tracking system for a low-level radioactive waste (LLW) disposal facility license application. In particular, the model tracks interrogatories (questions, requests for information, comments) and responses. A set of requirements and desired features for the model tracking system was developed, including required structure and computer screens. Nine tracking systems were then reviewed against the model system requirements and only two were found to meet all requirements. Using Kepner-Tregoe decision analysis, a model tracking system was selected.

Benbennick, M.E.; Broton, M.S.; Fuoto, J.S.; Novgrod, R.L.

1994-08-01T23:59:59.000Z

39

Real-time automatic license plate recognition for CCTV forensic applications  

Science Conference Proceedings (OSTI)

We propose an efficient real-time automatic license plate recognition (ALPR) framework, particularly designed to work on CCTV video footage obtained from cameras that are not dedicated to the use in ALPR. At present, in license plate detection, tracking ... Keywords: CCTV video footage, License plate recognition, Surveillance, Traffic monitoring, Video indexing

M. S. Sarfraz, A. Shahzad, Muhammad A. Elahi, M. Fraz, I. Zafar, E. A. Edirisinghe

2013-09-01T23:59:59.000Z

40

DOE-STD-0100T; DOE Standard Licensed Reactor Nuclear Safety Criteria Applicable to DOE Reactors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

00T 00T November 1993 Superseding DOE/NE-0100T April 1991 DOE STANDARD LICENSED REACTOR NUCLEAR SAFETY CRITERIA APPLICABLE TO DOE REACTORS U.S. Department of Energy Washington, D.C. 20585 AREA SAFT DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly frorn the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 487-4650. Order No. DE94005221 CONTENTS

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Email licensing  

Science Conference Proceedings (OSTI)

We propose a framework, email licensing, that allows email users to determine whose messages and in what content and conditions are authorized to come into their inboxes. The idea is to treat email address as a data owned by the addressee, and any use ... Keywords: Email licensing, Personal data licensing, Spam, Unsolicited emails

Yuh-Jzer Joung; Chu-Jui Yang

2009-05-01T23:59:59.000Z

42

Energy Efficiency and COl15ervation Block Grant Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COl15ervation Block Grant Program COl15ervation Block Grant Program Apptication submitted by the Chippewa Tribe of MN on behalf of the White Earth Band Energy Efficiency Retrofits The American Rccovery and Reinvestment Act of 2009, Public Law 111-5, appropriates funding for thc Department of Energy (DOE) to issue/award fonnula-based grants to states, U.S. territories, units ofloeal government, and Indian tribes under the Energy Efficiency and Conservation Block Grant (EECBG) Program. DOE's authorization for this program is set forth in Title V, Subtitle E, of the Energy Independence and Security Act (EISA) of2007. This CX determination is applicable to DOE elements reviewing and awarding fonnula- based and competitive grants under the EECBG Program, and includes, but is not limited to, EECBG Program

43

Parameter Selection for Department of Energy Spent Nuclear Fuel to be Used in the Yucca Mountain License Application  

SciTech Connect

This report contains the chemical, physical, and radiological parameters that were chosen to represent the U.S. Department of Energy spent nuclear fuel in the Yucca Mountain license application. It also contains the selected packaging requirements for the various fuel types and the criticality controls that were used. The data are reported for representative fuels and bounding fuels in groups of fuels that were selected for the analysis. The justification for the selection of each parameter is given. The data reported were not generated under any quality assurance program.

D. L. Fillmore

2003-10-01T23:59:59.000Z

44

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Pilgrim Nuclear Power Station (PNPS) License Renewal Application  

E-Print Network (OSTI)

information that supplemented the LRA as a result of operating experience (OE) and industry activities potentially relevant to aging management in several specific areas. This letter provides further clarification of that supplemental information to the LRA specific to the following areas which Entergy agreed to evaluate based upon communications with the NRC technical staff. 1. Aging management of neutron-absorbing materialsEntergy Nuclear Operations, Inc. Letter Number: 2.11.017 Pilgrim Nuclear Power Station Page 2 2. Inspection of buried pipe and tanks 3. Aging management of low voltage cables 4. Inspection of containment coatings 5. Metal fatigue NUREG/CR-6260 A new regulatory commitment is provided in the PNPS License Renewal Commitment List as

Stephen J. Bethay

2011-01-01T23:59:59.000Z

45

Licensing Opportunity Announcements | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Technology Licensing | Licensing Opportunity Announcements SHARE Licensing Opportunity Announcements UT-Battelle, LLC, acting under its Prime Contract No. ORNL Laboratory Director Signs New License Agreement DE-AC05-00OR22725 with the U.S. Department of Energy (DOE) for the management and operation of the Oak Ridge National Laboratory (ORNL), is posting notice of near-term license opportunities for technologies listed on this page and is requesting license applications from potential commercialization partners. ORNL will license these technologies in defined fields of use. License applications will be evaluated based on prospective partners' ability and commitment to successfully commercialize the technology, with a preference for United States-based

46

Licensing NIST Technologies  

Science Conference Proceedings (OSTI)

... Partnerships Office (TPO) works with partners to license NIST patented inventions. Parties interested in licensing an issued patent or patent ...

2013-04-08T23:59:59.000Z

47

License integration patterns: Addressing license mismatches in component-based development  

Science Conference Proceedings (OSTI)

In this paper we address the problem of combining software components with different and possibly incompatible legal licenses to create a software application that does not violate any of these licenses while potentially having its own. We call this ...

Daniel M. German; Ahmed E. Hassan

2009-05-01T23:59:59.000Z

48

Solar/Wind Contractor Licensing | Open Energy Information  

Open Energy Info (EERE)

Solar/Wind Contractor Licensing Solar/Wind Contractor Licensing < Solar Jump to: navigation, search Some states have established a licensing process for solar-energy contractors and/or wind-energy contractors. These requirements are designed to ensure that contractors have the necessary knowledge and experience to install systems properly. Solar licenses typically take the form of either a separate, specialized solar contractor's license, or a specialty classification under a general electrical or plumbing license. [1] Solar/Wind Contractor Licensing Incentives CSV (rows 1 - 24) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Alternative Energy System Contracting (Virginia) Solar/Wind Contractor Licensing Virginia Installer/Contractor Photovoltaics No

49

Occupational Risk Consequences of the Department of Energy's Approach to Repository Design, Performance Assessment, and Operation in the Yucca Mountain License Application  

Science Conference Proceedings (OSTI)

EPRI has discovered several aspects of the U.S Department of Energy (DOE) proposed design and operation of the Yucca Mountain repository thatif implemented as described in the license application (LA)could result in unnecessary occupational health and safety risk to workers involved with repository-related activities. This report identifies key DOE conservatisms and focuses on the occupational risk consequences of the DOE's approach to the repository design, performance assessment, and operation.

2008-08-12T23:59:59.000Z

50

TAO: License  

NLE Websites -- All DOE Office Websites (Extended Search)

Copyright 2013 , UChicago Argonne, LLC Copyright 2013 , UChicago Argonne, LLC Operator of Argonne National Laboratory All rights reserved. Toolkit for Advanced Optimization (TAO), Version 2.2.0 OPEN SOURCE LICENSE Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. Software changes, modifications, or derivative works, should be noted with comments and the author and organization's name. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

51

TECHNOLOGY LICENSE APPLICATION - ORNL  

... traded, or a person with a financial interest of more than $100,000 in the prospective licensee if the licensee's stock is publicly traded. 2010

52

License Application Guidelines  

6. A review of the competition currently existing or expected to develop follow-ing introduction of the product. 7. A comparison of this product to ...

53

Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues  

Science Conference Proceedings (OSTI)

This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.

Silverman, D.J.; Bauser, M.A. [Morgan, Lewis and Bockius, Washington, DC (United States); Baird, R.D. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

1998-07-01T23:59:59.000Z

54

Overview of the Yucca Mountain Licensing Process  

SciTech Connect

This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process.

M. Wisenburg

2004-05-03T23:59:59.000Z

55

Solar Heating Contractor Licensing  

Energy.gov (U.S. Department of Energy (DOE))

Michigan offers a solar heating contractor specialty license to individuals who have at least three years of experience installing solar equipment under the direction of a licensed solar contractor...

56

NREL: Technology Transfer - Licensing Agreements  

National Renewable Energy Laboratory Technology Transfer Licensing Agreements. Through licensing agreements, NREL provides industry with an opportunity to ...

57

Resource Management Services: Water Regulation, Part 600: Applications for Licenses and Preliminary Permits Under the Water Power Act (New York)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations provide instructions for applications proposing the construction, repair, or operation of hydropower sources. Applications are reviewed by the Water Power and Control Commission.

58

State of California BOARD OF EQUALIZATION CIGARETTE AND TOBACCO PRODUCTS LICENSING ACT REGULATIONS  

E-Print Network (OSTI)

A new license shall not be issued to an applicant when any of the following apply: (1) a license subject to civil or criminal citation has been issued for the same location; (2) a license for the same location is suspended; (3) a license for the same location has been revoked any time within the preceding five years; or (4) any person

Regulation Denial; Of License

2006-01-01T23:59:59.000Z

59

License Iso. CM35  

Office of Legacy Management (LM)

License Iso. CM35 License Iso. CM35 hUhUll4MhiM&POlltYll7~ llolh-thRqalStract Alolan&le, vlrghla Attoatlonl w. & 0. EutahlDon Pursuant to the Atanic Energy Act of 1954 and Section 40.21 or the Code of Federal Regulations, Title 10 - Atomic Energy, Chapter 1, Part 40 - Control of Sauce Haterid, you are hereby licensed to receive possession of and title to three hundred uwi l lght the term of this liceaee for pounda of refined eource material during 880 in meueb and demlopmt aotiritim MDool.atd lfltb fual oleroat f*hrlcmtlon. You are nirthcr licensed to transfer aad deliver poaaeeslon of and title to refined ecwce material to any person licensed by the Atcmlc Energy ~~slon, VitAin the limits of his license. i f Am a condition of iemzaace of thie llcenee, you are required to maintain

60

Related to the License Renewal  

E-Print Network (OSTI)

requested that the U.S. Nuclear Regulatory Commission (NRC) renew the operating license for Ginna (license number DPR-18) for a period of 20 years beyond the current expiration of midnight, September 18, 2009. The Ginna plant is located in the Town of Ontario, in the northwest corner of Wayne County, New York, on the south shore of Lake Ontario. The NRC issued the construction permit in April 1966, followed by a provisional operating license on September 19, 1969, and a full-term operating license on December 10, 1984. The Ginna unit consists of a Westinghouse pressurized-water reactor with nuclear steam supply systems designed to operate at core power levels up to 1,520 megawatts-thermal, or approximately 490 megawatts-electric. This SER presents the status of the staffs review of information submitted to the NRC through January 9, 2004. In its SER with open items, issued on October 9, 2003, the staff identified open and confirmatory items that required resolution before the staff could make a final determination on the application. These items are summarized in Sections 1.5 and 1.6 of this

R. E. Ginna; Nuclear Power Plant; R. E. Ginna; Nuclear Power Plant

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Research License Agreement Template  

NLE Websites -- All DOE Office Websites (Extended Search)

Research License Template Research License Template RESEARCH LICENSE Between Alliance for Sustainable Energy, LLC And [COMPANY or UNIVERSITY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date"), is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located at 1617 Cole Blvd., Golden, Colorado 80401 and [COMPANY or UNIVERSITY NAME], (hereinafter "Research Licensee"), a [FOR-PROFIT or NON-PROFIT] entity organized and existing under the laws of the State of [NAME of STATE] and having a principal place of business at [ADDRESS], hereinafter referred

62

END USER LICENSE  

to be accessed over the internet; c. LICENSEE may copy the Software solely to the extent necessary to exercise the foregoing license, ...

63

END USER LICENSE SAC  

to be accessed over the internet; c. LICENSEE may copy the Software solely to the extent necessary to exercise the foregoing license, ...

64

Licensing Guidelines | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

parties. Licenses that include the right to sublicense to others also include financial terms for sublicensing revenue that is based on the commercialization of the technology by a...

65

Licensing Berkeley Lab Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

to inquire. For more information on licensing, please see Frequently Asked Questions . Contact Us Receive Customized Tech Alerts Tech Transfer Site Map Last updated: 09172009...

66

Licensing topical report: applicability of Division 1 regulatory guides to high-temperature gas-cooled reactors  

SciTech Connect

The application of Division 1 (power reactors) regulatory guides to high-temperature gas-cooled reactors (HTGRs) is discussed. About eighty of the Division 1 guides can be applied to any type of reactor; the remaining sixty, mostly written for light water reactors (LWRs), are divided between (1) those not applicable to the HTGR because of fundamental differences in design, (2) those applicable in intent but containing positions specific to LWRs, and (3) those written for LWRs but of sufficient generality to be applied to the HTGR without major exception. Emphasis is placed on issues which involve the unique characteristics of the HTGR. The regulatory guides evaluated are those extant as of early 1980. The positions presented are subject to periodic updating owing to the continuing modification of the guides and because the design options for the HTGR are at various stages of development. Nevertheless, this report is believed to provide a sound basis for evaluating conformance with existing Division 1 guides.

Lewis, J.H.

1980-12-01T23:59:59.000Z

67

Licensable Life Science Technologies | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensable Life Science Technologies A selection of biology-based technologies available for licensing licensablebiologicaltechnologies...

68

Reasons for decision in the matter of Imperial Oil Resources Limited and Boston Gas Company application pursuant to Part VI of the National Energy Board Act for a license to export natural gas: GH-1-99  

Science Conference Proceedings (OSTI)

This document provides the Reasons for Decision in the matter of Hearing Order GH-1-99, heard in Halifax, NS on May 4 and 5, 1999. The proceeding concerns an application for a gas export license from Imperial Oil Resources Ltd. (IORL) and Boston Gas for a proposed export for sale to Boston Gas for the period 1 Nov 1999 to 31 Mar 2007. The natural gas will be produced from the Sable Offshore Energy Project and replace IORL's Alberta natural gas supplies sold to Boston Gas. The document includes a discussion of the market-based procedure used by the Board to assess the merits of an application to obtain a gas export license.

Not Available

1999-01-01T23:59:59.000Z

69

VERMONT YANKEE NUCLEAR POWER STATION- NRC LICENSE  

E-Print Network (OSTI)

your application for a renewed license of your Vermont Yankee Nuclear Power Station. The enclosed report documents the result of the inspection which was discussed with members of your staff on May 24, 2007, at a publicly observed exit meeting conducted at the Latchis Theater in Brattleboro, VY. The purpose of this inspection was to examine the plant activities and documents that supported the application for a renewed license of the Vermont Yankee Nuclear Power Station. The inspection reviewed the screening and scoping of non-safety related systems, structures, and components, as required in 10 CFR 54.4(a)(2), and determined whether the proposed aging management programs are capable of reasonably managing the effects of aging. These NRC inspection activities constitute one of several inputs into the NRC review process for license renewal applications. The inspection team concluded screening and scoping of nonsafety-related systems, structures, and components, were implemented as required in 10 CFR 54.4(a)(2), and the aging management portions of the license renewal activities were conducted as described in the License Renewal Application. The inspection results supported a conclusion that the

Mr. Theodore; A. Sullivan

2007-01-01T23:59:59.000Z

70

Calvert Cliffs License Renewal Aging Management Review Reports  

Science Conference Proceedings (OSTI)

This report and associated CD-ROM documents the Calvert Cliffs License Renewal Aging Management Review Reports as of December 1998. The option to operate a nuclear power plant beyond its initial license term of 40 years is an important factor in financial decisions and long-term planning for utility asset management and capital improvement. This report provides other utilities with details of the technical evaluations to support their own preparation of a License Renewal Application (LRA).

1999-06-23T23:59:59.000Z

71

Nuclear Regulatory Commission Regulatory and Licensing Matters | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Commission Regulatory and Licensing Matters Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a variety of NRC matters including regulation and licensing of DOE independent spent fuel storage facilities (ISFSIs) and a mixed-oxide fuel fabrication facility, consultation with NRC on certain DOE waste determinations, and imports and exports of nuclear materials and radioactive sealed sources.

72

PNNL: Technology Transfer - Our Licensing Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Our Licensing Guidelines PNNL approaches licensing in a flexible, collaborative manner Although every technology license is unique, at PNNL we recognize that there are basic...

73

Technical Bases for the Development and Application of Derived Concentration Guidance Levels for Decommissioning and License Termination of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Nuclear Power plants achieve license termination by meeting regulatory site release criteria. Depending on the country, these criteria may be based on radionuclide concentration or dose. For dose-based criteria, corresponding radionuclide concentration limits, called Derived Concentration Guidance Levels (DCGLs), must also be developed. This report provides information related to site release criteria and the development of DCGLs.BackgroundThe ultimate goal ...

2012-09-10T23:59:59.000Z

74

NRC LICENSE RENEWAL SCOPING/SCREENING INSPECTION  

E-Print Network (OSTI)

Dear Mr. Nazar: On May 21, 2004, the NRC completed an inspection regarding the application for license renewal for the D. C Cook Nuclear Plant. The enclosed report documents the inspection results, which were discussed with members of your staff. The purpose of this inspection was an examination of activities that support the application for a renewed license for D. C. Cook. The inspection consisted of a selected examination of procedures and representative records, and interviews with personnel regarding the process of scoping and screening plant equipment to select equipment subject to an aging management review. The inspection concluded that the scoping and screening portion of license renewal activities was conducted as described in the License Renewal Application and that documentation supporting the application is in an auditable and retrievable form. With the exception of the items identified in this report, your scoping and screening process was successful in identifying those systems, structures, and components required to be considered for aging management. In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice, " a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

Cynthia D. Pederson; M. Finissi; Plant Manager; G. White; Michigan Public; Service Commission

2004-01-01T23:59:59.000Z

75

Non-Power Reactor Operator Licensing Examiner Standards. Revision 1  

SciTech Connect

The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

NONE

1995-06-01T23:59:59.000Z

76

Argonne TDC: Licensing Intellectual Property from Argonne ...  

Licensing Intellectual Property from Argonne National Laboratory. Argonne's licensing program provides companies with opportunities to acquire rights in Argonne ...

77

Switching converter techniques for energy harvesting applications.  

E-Print Network (OSTI)

??xii, 95 leaves : ill. (some col.) ; 30 cm HKUST Call Number: Thesis ECED 2007 Sze Energy harvesting could provide a micro-sensor application with (more)

Sze, Ngok Man

2007-01-01T23:59:59.000Z

78

NREL: Technology Transfer - Licensing Agreements  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing Agreements Licensing Agreements Through licensing agreements, NREL provides industry with an opportunity to commercialize NREL-developed energy technologies and products. Our licensing opportunities are available to both small and large businesses-from start-ups to Fortune 500 companies. Process The licensing agreement process basically includes seven steps. See the NREL Licensing Agreement Process flowchart. We are committed to working through these steps in a timely manner. Experience suggests that the fastest means to reach an agreement is through direct communications to create understanding and agree on actions. 1. Identify and Qualify Opportunity To identify an opportunity, a company can browse the technologies available for licensing. When an opportunity has been identified, NREL then asks the company to

79

Los Alamos National Laboratory announces Express Licensing program  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL announces Express Licensing program LANL announces Express Licensing program Los Alamos National Laboratory announces Express Licensing program With the launch of a new "Express Licensing" program, access to innovative technology invented at Los Alamos National Laboratory has gotten easier. August 1, 2013 The following sequence shows the formation of nanoFOAM technology developed at Los Alamos National Laboratory. NanoFOAMs are self-supporting nanoporous metal foams that have potential applications in oil-refining processes, filtration of liquid or airborne germs, rocket fuels or catalytic production of a range of products from ammonia to plastics. NanoFOAM is just one of many licensable technologies available at Los Alamos National Laboratory. The following sequence shows the formation of nanoFOAM technology developed

80

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Program Info State Florida Program Type Solar/Wind Contractor Licensing Provider Florida Solar Energy Industries Association Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued since that time, although people holding these licenses may renew them. The new solar contractor license defines a broader scope of work. With the new license, solar contractors have the authority to install, maintain and

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Swimming Pool Heaters Water Heating Program Info State California Program Type Solar/Wind Contractor Licensing Provider California Contractors State License Board The California Contractors State License Board administers contractor licenses. The C-46 Solar Contractor license covers active solar water and space heating systems, solar pool heating systems, and photovoltaic systems. C-46 requirements include four years of experience and passing the business and law exam and the trade exam. Independent license schools offer courses to prepare for license exams.

82

ENERGY COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE  

Office of Legacy Management (LM)

COMMISSION COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE Pursuant to the rcgu!ations in Title 10, Code of Federal Regulations, Chapter 1, Part 40, application is hereby made for a license to receive, possess, use, transfer, deliver or import into the United Stat-, source material for the activity or activities described. 1. (check ooa) 2. NAME OF APPLICANT W. R. GRACE 6 Co. 0 (a) New Iicense 0 (b) Amendment to License No.- Davison Chemical Division STA-422 3. Q (c) Renewal of Licensr No. 0 (d) Previous License No. Pompton Plains, N. J. 4. ST,.TE THE AOORESS(ES) AT WHICH SOURCE MATERIAL WILL BE POSSESSED OR USED 868 Black Oak Ridge Road, Wayne, fi. J. a*ocY s up/'l File IF 5. BUSINESS OR OCCUPATION I 6. (a) IF APPLICANT IS AN INDIVIDUAL. STATE CITIZENSHIP

83

Collimation and material science studies (ColMat) at GSI.  

E-Print Network (OSTI)

Within the frame of the EuCARD program, the GSI Helmholtzzentrum fr Schwerionenforschung in Darmstadt is performing accelerator R&D in workpackage 8: ColMat. The coordinated effort is focussed on materials aspects important for building the FAIR accelerator facility at GSI and the LHC upgrade at CERN. Accelerator components and especially protection devices have to be operated in high dose environments. The radiation hazard occurs either by the primary proton and ion beams or the secondary radiation after initial beam loss. Detailed numerical simulations have been carried out to study the damage caused to solid targets by the full impact of the LHC beam as well as the SPS beam. Tungsten, copper and graphite as possible collimator materials have been studied. Experimental an theoretical studies on radiation damage on materials used for the LHC upgrade and the FAIR accelerators are performed at the present GSI experimental facilities. Technical decisions based on these results will have an impact on the F...

Stadlmann, J; Kollmus, H; Krause, M; Mustafin, E; Petzenhauser, I; Spiller, P; Strasik, I; Tahir, N; Tomut, M; Trautmann, C

2010-01-01T23:59:59.000Z

84

Transmittal of Additional Information For License  

E-Print Network (OSTI)

By letter dated June 5, 2001 Southern Nuclear Operating Company (SNC) formally transmitted the collected responses to eighteen open items contained in the draft license renewal Safety Evaluation Report to NRC. Since that time additional information has been developed on several open items, and Appendix B, the FSAR Supplement, and various application sections have been revised. This letter formally transmits all additional information related to the Hatch license renewal application and the related open items, and is intended to complete the documentation necessary to allow the open items to be closed by the NRC. If you have any questions concerning this information, please contact this office. Respectfully submitted, HLS/JAM H. L. Sumner, Jr. Enclosures:

Lewis Sumner; Edwin I. Hatch; Nuclear Plant

2001-01-01T23:59:59.000Z

85

Objectives, characteristics and outcomes of university licensing: A survey of major U.S. universities  

E-Print Network (OSTI)

Abstract This paper describes results of our survey of licensing at 62 research universities. We consider ownership, income splits, stage of development, marketing, license policies and characteristics, goals of licensing and the role of the inventor in licensing. Based on these results we analyze the relationship between licensing outcomes and both the objectives of the TTO and the characteristics of the technologies. Patent applications grow one-to-one with disclosures, while sponsored research grows similarly with licenses executed. Royalties are typically larger the higher the quality of the faculty and the higher the fraction of licenses that are executed at latter stages of development. Sponsored research is more likely to be included in a license if the new technology is at an early stage of development or if the TTO evaluates it as important. We find that additional disclosures generate smaller percentage increases in licenses, and those increases in licenses generate smaller percentage increases in royalties. University licensing has increased dramatically since the passage of the Bayh-Dole Act in 1980, which gave universities the right to retain title to and license inventions resulting from federallysponsored

Jerry G. Thursby; Richard Jensen; Marie C. Thursby

2001-01-01T23:59:59.000Z

86

Technology Licensing Contacts | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

(865) 574-1051 Biography Robert Scott Administrative Assistant scottre@ornl.gov (865) 241-2356 Jennifer Caldwell Technology Licensing, Group Leader caldwelljt@ornl.gov (865)...

87

XRY{*?C**kL,x*SGH]??*?*COLyc**? (rP??*0Ge ...  

Science Conference Proceedings (OSTI)

XRY{*?C**kL,x*SGH]??*?*COLyc**? (rP??*0Ge

2012-10-23T23:59:59.000Z

88

Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report  

Science Conference Proceedings (OSTI)

This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

Eugene S. Grecheck David P. Batalo

2010-11-30T23:59:59.000Z

89

Renewable Energy Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Renewable Energy Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Home Weatherization Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Wind Program Info State Oregon Program Type Solar/Wind Contractor Licensing Provider Department of Consumer and Business Services Oregon requires trade licenses for people installing solar energy equipment, and contractor licenses for the companies that do construction. Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of making plumbing

90

Technologies Available for Licensing | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Analytical Instrumentation Chemicals Detectors and Sensors Energy and Utilities Healthcare and Biology Information Technology and Communications Manufacturing Materials Security and Defense Transportation Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | Available Technologies SHARE Available Technologies One of the primary missions of the Technology Transfer Division is to move our intellectual property from the research facility to the commercial

91

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Nevada Program Type Solar/Wind Contractor Licensing Provider Nevada State Contractors Board - Reno Nevada law requires that solar energy system installers be licensed by the Nevada State Contractors Board. Contractors may be licensed under License Classification C-37 (solar contracting for solar water heating and space heating and air conditioning). Contractors may also perform solar work under License Classification C-1* (plumbing and heating), sub-classification (d) for solar water heating installations, or

92

Property:FERC License | Open Energy Information  

Open Energy Info (EERE)

License Jump to: navigation, search Property Name FERC License Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense&oldid610683...

93

DANESS DEVELOPERS SOFTWARE LICENSE AGREEMENT This Agreement ...  

Daness Developers Web License,.Version, 4.5, Sept. 2009 1 DANESS DEVELOPERS SOFTWARE LICENSE AGREEMENT. This Agreement, is made between the UChicago Argonne ...

94

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

general plumbing contractors carrying an S210 license are authorized to install solar thermal systems. The Division has also established solar-specific license classifications....

95

Sandia National Laboratories : Licensing/Technology Transfer ...  

IP Home; Search/Browse Technology Portfolios; Licensing Overview; Ready-to-Sign Licenses; DOE SBIR TTI; Government Use Notices; News; Contact Us; Technology Summary

96

NREL: Technology Transfer - Nonexclusive and Exclusive Licenses  

Nonexclusive and Exclusive Licenses. NREL's technology licensing agreements with companies are either nonexclusive or exclusive depending on their field of use.

97

Featured Licensing Professional - Energy Innovation Portal  

Eric Payne. Meet Eric Payne! Eric is the Senior Licensing Executive at the National Renewable Energy Laboratory and one of the licensing contacts on the Energy ...

98

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

and operate Lawrence Livermore National Laboratory ... which may be useful for human health treatment ... Licensed Service means the use of Licensed ...

99

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Eligibility InstallerContractor Savings For Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling...

100

DOE NETL Intellectual Property Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

18.12 18.12 DOE NETL Intellectual Property Available for Licensing Complete marketing summaries of the following technologies will be posted on the NETL Available Technologies page shortly. For additional information or to submit a license application, please contact techtransfer@netl.doe.gov. Technology Title and Brief Description Intellectual Property Status Metal oxide promoters for improving the reactivity and capacity of oxygen carriers for the chemical looping combustion process This invention provides an oxygen carrier comprised of a plurality of metal oxide particles in contact with a plurality of MgO promoter particles. The MgO promoter particles increase the reaction rate and oxygen utilization of the metal oxide when contacting with a gaseous hydrocarbon at a temperature greater than

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

ECOdriving - Widespread Implementation for Learner Drivers and Licensed  

Open Energy Info (EERE)

ECOdriving - Widespread Implementation for Learner Drivers and Licensed ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Agency/Company /Organization: Austrian Energy Agency Focus Area: Fuels & Efficiency Topics: Best Practices Website: www.ecodrive.org/ The ECOWILL project aims to reduce carbon emissions by up to 8 Mt until 2015 by boosting the application of eco-driving across Europe. The project will roll out training programs for licensed drivers in 13 European countries. ECOWILL also promotes the education of eco-driving for learner drivers. This website provides information about eco-driving, including country-specific activities.

102

Licensing arrangements and the development of the solar energy industry  

SciTech Connect

The process by which technology and information related to technology are transferred within industry is explored. Property rights in technology are part of the broader field of intellectual property. The general contours of legal protection for knowledge are explored. The four basic forms of intellectual property - patents, trade secrets (or know-how), trademarks, and copyrights - are covered in varying degrees of depth, depending on their relative applicability to the development of the solar industry. Once this background has been established, the legal aspects of licensing are examined. A license is a legal arrangement whereby a party (licensor) who controls the right to use an idea, invention, etc. shares the right to use the particular intellectual property with someone else (licensee). The advantages and disadvantages of licensing are described from the point of view of potential licensees and licensors. Barriers to licensing are discussed.

Green, M.

1979-06-01T23:59:59.000Z

103

How to License Technologies | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | How To License ORNL Technologies SHARE How To License ORNL Technologies Technology Evaluation The first step in the licensing process is for you to identify technologies of interest to you. As a starting point, you may wish to browse the available technologies or search using keywords and the ORNL InSpire Technology Search Engine. At any point in your search, please feel free to contact the commercialization manager identified for each technology or

104

Alternative Fuels Data Center: Ethanol License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol License to Ethanol License to someone by E-mail Share Alternative Fuels Data Center: Ethanol License on Facebook Tweet about Alternative Fuels Data Center: Ethanol License on Twitter Bookmark Alternative Fuels Data Center: Ethanol License on Google Bookmark Alternative Fuels Data Center: Ethanol License on Delicious Rank Alternative Fuels Data Center: Ethanol License on Digg Find More places to share Alternative Fuels Data Center: Ethanol License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol License Anyone who imports, exports, or supplies ethanol in the state of Wyoming must obtain an annual license from the Wyoming Department of Transportation. The fee for each license is $25. (Reference Wyoming

105

Department of Energy Files Motion to Withdraw Yucca Mountain License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Files Motion to Withdraw Yucca Mountain Files Motion to Withdraw Yucca Mountain License Application Department of Energy Files Motion to Withdraw Yucca Mountain License Application March 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy today filed a motion with the Nuclear Regulatory Commission to withdraw the license application for a high-level nuclear waste repository at Yucca Mountain with prejudice. "President Obama is fully committed to ensuring that the Nation meets our long-term storage obligations for nuclear waste," said Department of Energy General Counsel Scott Blake Harris. "In light of the decision not to proceed with the Yucca Mountain nuclear waste repository, the President directed Secretary Chu to establish the Blue Ribbon Commission on America's

106

The Atomic Safety and Licensing Board Panel  

SciTech Connect

Through the Atomic Energy Act, Congress made is possible for the public to get a full and fair hearing on civilian nuclear matters. Individuals who are directly affected by any licensing action involving a facility producing or utilizing nuclear materials may participate in a formal hearing, on the record, before independent judges on the Atomic Safety and Licensing Board Panel (ASLBP or Panel). Frequently, in deciding whether a license, permit, amendment, or extension should be granted to a particular applicant, the Panel members must be more than mere umpires. If appropriate, they are authorized to go beyond the issues the parties place before them in order to identify, explore, and resolve significant questions involving threats to the public health and safety that come to a board`s attention during the proceedings. This brochure explains the purpose of the panel. Also addressed are: type of hearing handled; method of public participation; formality of hearings; high-level waste; other panel responsibilities and litigation technology.

NONE

1998-03-01T23:59:59.000Z

107

Exclusive License: AGMT-XXXX  

NLE Websites -- All DOE Office Websites (Extended Search)

5.20.2011 UU.S. DEPARTMENT OF ENERGY UNATIONAL ENERGY TECHNOLOGY LABORATORY UEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement is by and between the United States Department of...

108

BIOLOGICAL ASSESSMENT FOR BALD EAGLES FOR LICENSE RENEWAL  

E-Print Network (OSTI)

The Nuclear Regulatory Commission (NRC) is evaluating an application submitted by Virginia Electric and Power Company (VEPCo) for the renewal of the operating licenses for an additional 20 years for its Surry Power Station (SPS), Units 1 and 2. The SPS is located on the Gravel Neck Peninsula in Surry County, Virginia. The current license for Unit 1 will expire on May 25, 2012, and for Unit 2 on January 29, 2013. License renewal will extend the operating license for each unit an additional 20 years past the above dates. The proposed action would include the continued operation and maintenance of the existing facilities at the SPS site and the transmission corridor that connects the SPS, Units 1 and 2, to the regional electrical grid. The proposed action will not include any new construction or onsite disturbance. The NRC is preparing a supplement to its 1996?Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) for this proposed license renewal. As part of the renewal review, we evaluate potential impacts to Federally listed, proposed, or candidate species, as well as designated or proposed critical habitat. In a letter to the Virginia Field Office of the U.S. Fish and Wildlife Service (FWS) dated January 24, 2002, the NRC staff requested a list of Federally protected species and any critical

John P. Wolflin; U. S. Fish; Wildlife Service

2002-01-01T23:59:59.000Z

109

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Arizona Program Type Solar/Wind Contractor Licensing Provider Registrar of Contractors The Arizona Registrar of Contractors does not offer a general solar electric contractor license, but the state's C-11/L-11 electrical license covers solar electric installations. C-11 licenses are required for electrical work on residential property and L-11 licenses apply to commercial installations. Contractors can also acquire a K-11 license to work on both residential and commercial installations. The Arizona Registrar of Contractors does have a specific plumbing license

110

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

111

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

112

NRC Licensing Strategy Development for the NGNP  

DOE Green Energy (OSTI)

The Next Generation Nuclear Plant (NGNP) project will provide the basis for commercialization of a new generation of advanced nuclear plants that utilize hightemperature gas-cooled reactor (HTGR) technology. The inherently safe HTGR design characteristics can be utilized to supply high-temperature process heat, co-generated electricity, and/or hydrogen for a number of industrial applications (e.g., petrochemical processes). Completion of the NGNP will result in a facility that demonstrates the safety and economics of the design, the commercial industrial potential of the technology, and the viability of the licensing strategy.

Mark R. Holbrook; Trevor Cook

2008-09-01T23:59:59.000Z

113

Oconee Electrical Component Integrated Plant Assessment and Time Limited Aging Analyses for License Renewal: Revision 1  

Science Conference Proceedings (OSTI)

Duke Power Co. and Baltimore Gas and Electric Co. were the first two utilities to apply for and obtain license renewal for their nuclear units. This report is one in a series of EPRI reports providing the technical basis for the Oconee and Calvert Cliffs License Renewal Applications.

2000-08-10T23:59:59.000Z

114

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Any person acting as an alternative fuels dealer must hold a valid alternative fuel license and certificate from the Wisconsin Department of Administration. Except for alternative fuels that a dealer delivers into a

115

U.S. Material Licenses  

E-Print Network (OSTI)

There are approximately 22,400 licenses issued for medical, academic, industrial, and general uses of radioactive materials in the United States. The United States Nuclear Regulatory Commission (NRC) and State radiation safety regulatory programs are responsible for ensuring protection of public health and safety and the environment. Currently, there are approximately 3,450 licenses issued by the NRC and 18,950 licenses issued by the 36 Agreement States. An Agreement State is any state with which the Atomic Energy Commission or the Nuclear Regulatory Commission has entered into an Agreement under subsection 274b of the Atomic Energy Act of 1954 (as amended). Definition of the National Materials Program The National Materials Program (NMP) is a term that has been used for many years, to define the broad collective framework within which both NRC and the Agreement States function in carrying out their respective radiation safety regulatory programs. This framework also includes

unknown authors

2009-01-01T23:59:59.000Z

116

Technology@TMS: Online Article - Materials Technology@TMS  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) today made available the public version of a combined license (COL) application for a new reactor at the North...

117

Sensor network based vehicle classification and license plate identification system  

Science Conference Proceedings (OSTI)

Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, ... Keywords: acoustic vehicle classification, license plate detection, seismic, wireless sensor networks

Jan Frigo; Vinod Kulathumani; Sean Brennan; Ed Rosten; Eric Raby

2009-06-01T23:59:59.000Z

118

Application - Lawrence Livermore National Laboratory  

Search & Browse Software: Licensing Instructions: Patents: Application. Industrial Partnerships Office P.O. Box 808, L-795 Livermore, CA 94551 ...

119

ENERGY STAR Guide for Licensed Professionals | ENERGY STAR Buildings &  

NLE Websites -- All DOE Office Websites (Extended Search)

Guide for Licensed Professionals Guide for Licensed Professionals Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

120

NREL: Technology Transfer - Technologies Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Available for Licensing Technologies Available for Licensing Photo of NREL scientist in the NREL Hydrogen Lab. NREL's scientists and engineers develop award-winning technologies available for licensing. NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing. We have many licensing opportunities for NREL-developed technologies, including our featured LED technologies. To see all our technologies available for licensing, visit the EERE Innovation Portal and search for NREL. Learn about our licensing agreement process. Contact For more information about licensing NREL-developed technologies, contact Eric Payne, 303-275-3166. Ombuds NREL strives to quickly resolve any issue or concern you may have regarding

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Sandia National Laboratories : Licensing/Technology Transfer ...  

Ready-to-Sign licenses require that R & D and substantial manufacture of the licensed product occur within the U.S. to provide benefit to the U.S. economy.

122

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Alternative fuel providers, bulk users, and retailers, or any person who fuels an alternative fuel vehicle from a private source that does not pay

123

License Stewardship Approach to Commercial Nuclear Power Plant Decommissioning  

SciTech Connect

The paper explores both the conceptual approach to decommissioning commercial nuclear facilities using a license stewardship approach as well as the first commercial application of this approach. The license stewardship approach involves a decommissioning company taking control of a site and the 10 CFR 50 License in order to complete the work utilizing the established trust fund. In conclusion: The license stewardship approach is a novel way to approach the decommissioning of a retired nuclear power plant that offers several key advantages to all parties. For the owner and regulators, it provides assurance that the station will be decommissioned in a safe, timely manner. Ratepayers are assured that the work will be completed for the price they already have paid, with the decommissioning contractor assuming the financial risk of decommissioning. The contractor gains control of the assets and liabilities, the license, and the decommissioning fund. This enables the decommissioning contractor to control their work and eliminates redundant layers of management, while bringing more focus on achieving the desired end state - a restored site. (authors)

Daly, P.T.; Hlopak, W.J. [Commercial Services Group, EnergySolutions 1009 Commerce Park, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

124

NETL: News Release - Successful Clean Coal Technology Licensed for  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2010 6, 2010 Successful Clean Coal Technology Licensed for Commercial Application DOE Receives First Repayment for Liquid Phase Methanol Process Development Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH(tm)) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

125

Argonne licenses diamond semiconductor discoveries to AKHAN Technologies |  

NLE Websites -- All DOE Office Websites (Extended Search)

licenses diamond semiconductor discoveries to AKHAN Technologies licenses diamond semiconductor discoveries to AKHAN Technologies By Joseph Bernstein * By Jared Sagoff * March 4, 2013 Tweet EmailPrint LEMONT, Ill. - The U.S. Department of Energy's Argonne National Laboratory announced today that the laboratory has granted AKHAN Technologies exclusive diamond semiconductor application licensing rights to breakthrough low-temperature diamond deposition technology developed by Argonne's Center for Nanoscale Materials (CNM). The Argonne-developed technology allows for the deposition of nanocrystalline diamond on a variety of wafer substrate materials at temperatures as low as 400 degrees Celsius. The combination of the Argonne's low-temperature diamond technology with AKHAN's Miraj Diamond(tm) process represents the state of the art in diamond semiconductor

126

Guide to Microsoft Volume Licensing June 2013 i  

E-Print Network (OSTI)

Guide to Microsoft Volume Licensing June 2013 i Guide to Microsoft Volume Licensing #12;Guide to Microsoft Volume Licensing June 2013 ii Table of Contents Chapter 1: Introduction to Microsoft Volume................................................................................................................................................................ 1 Keys to Understanding Microsoft Volume Licensing

Narasayya, Vivek

127

Vehicles and Fuels Technologies Available for Licensing ...  

Vehicles and Fuels Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

128

Advanced Materials Technologies Available for Licensing ...  

Advanced Materials Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

129

Solar Thermal Technologies Available for Licensing ...  

Solar Thermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

130

Sandia National Laboratories Technologies Available for Licensing ...  

Wind Energy; Partners (27) Visual Patent Search; Success Stories; News; Events; Sandia National Laboratories Technologies Available for Licensing

131

Sandia National Laboratories : Licensing/Technology Transfer ...  

IP Home; Search/Browse Technology Portfolios; Licensing Overview; ... National Defense and Security; Molecular Spectroscopy; Imaging Array; Medical Imaging; Remote ...

132

Energy Storage Technologies Available for Licensing ...  

Energy Storage Technologies Available for Licensing U.S. Department of Energy laboratories and participating research institutions have energy storage ...

133

Industrial Technologies Available for Licensing - Energy ...  

Industrial Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have technologies ...

134

Biomass and Biofuels Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Biomass and Biofuels Technologies Available for Licensing - Energy Innovation ...

135

Solar Photovoltaic Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Solar Photovoltaic Technologies Available for Licensing - Energy Innovation Portalto ...

136

Geothermal Technologies Available for Licensing - Energy ...  

Geothermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating institutions research and develop ...

137

Ames Laboratory Technologies Available for Licensing - Energy ...  

Bookmark Ames Laboratory Technologies Available for Licensing - Energy Innovation Portal on Google; Bookmark Ames Laboratory Technologies Available ...

138

Sandia National Laboratories : Licensing/Technology Transfer  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; Licensing and Technology Transfer. IP Home; Search ...

139

Windows Server 2008 R2 Licensing Guide  

E-Print Network (OSTI)

Windows Server 2008 R2 Licensing Guide m Your Comprehensive Resource for Licensing and Pricing #12;2 Table of Contents Summary 3 Table of Windows Server 2008 R2 Core Product Offerings 3 License Terms ­ Windows Server 2008 R2 Product Line Updates 4 Edition Comparison by Server Role 5 New and Updated Features

Narasayya, Vivek

140

NSNFP Activities in Support of Repository Licensing for Disposal of DOE SNF  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Office of Civilian Radioactive Waste Management is in the process of preparing the Yucca Mountain license application for submission to the Nuclear Regulatory Commission as the nations first geologic repository for spent nuclear fuel (SNF) and high-level waste. Because the DOE SNF will be part of the license application, there are various components of the license application that will require information relative to the DOE SNF. The National Spent Nuclear Fuel Program (NSNFP) is the organization that directs the research, development, and testing of treatment, shipment, and disposal technologies for all DOE SNF. This report documents the work activities conducted by the NSNFP and discusses the relationship between these NSNFP technical activities and the license application. A number of the NSNFP activities were performed to provide risk insights and understanding of DOE SNF disposal as well as to prepare for anticipated questions from the regulatory agency.

Henry H. Loo; Brett W.. Carlsen; Sheryl L. Morton; Larry L. Taylor; Gregg W. Wachs

2004-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Licensing topical report: interpretation of general design criteria for high-temperature gas-cooled reactors  

SciTech Connect

This Licensing Topical Report presents a set of General Design Criteria (GDC) which is proposed for applicability to licensing of graphite-moderated, high-temperature gas-cooled reactors (HTGRs). Modifications as necessary to reflect HTGR characteristics and design practices have been made to the GDC derived for applicability to light-water-cooled reactors and presented in Appendix A of Part 50, Title 10, Code of Federal Regulations, including the Introduction, Definitions, and Criteria. It is concluded that the proposed set of GDC affords a better basis for design and licensing of HTGRs.

Orvis, D.D.; Raabe, P.H.

1980-01-01T23:59:59.000Z

142

Commercialization and Licensing | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Success Stories Success Stories Commercialization and Licensing Economic Development Industrial Partnerships Sponsored Research Partnerships Home | Connect with ORNL | For Industry | Partnerships | Success Stories | Commercialization and Licensing Success Stories Commercialization and Licensing 1-10 of 14 Results Prev 12 Next DNP Green Technology, Inc. Exclusively Licenses Patents Invented at Argonne National Laboratory and Oak Ridge National Laboratory March 09, 2010 - On March 9, 2010, UT-Battelle, LLC, UChicago Argonne, LLC, and DNP Green Technology, INC fully executed an exclusive license agreement for patents invented solely by Argonne National Laboratory and jointly by Oak Ridge National Laboratory (ORNL) and Argonne National Laboratory (ANL). GE-Reuter Stokes to Market SNS-Designed Electronics

143

Entergy Grand Gulf site, MS issued on April 5, 2007. Dominion Energy North Anna site, VA issued on November 27, 2007.  

E-Print Network (OSTI)

decision expected 2009. Duke notified NRC of future planned ESP applications (as many as 2) Possibly Oconee County, SC, and Davie County, NC, no dates identified. Unspecified power company announced plans to submit an ESP application in fiscal year 2010. Combined Construction and Operating License (COL) Summary: Of nine COL applications submitted, six have been docketed for NRC review. 20 power companies, of which two are unidentified, intend to submit 23 license applications for 34 units. A Reference COL (R-COL) application has been submitted for four of the five reactor designs. Combined Construction and Operating License Applications (COLA) Submitted:

unknown authors

2008-01-01T23:59:59.000Z

144

Entergy Grand Gulf site, MS issued on April 5, 2007. Dominion Energy North Anna site, VA issued on November 27, 2007.  

E-Print Network (OSTI)

decision expected 2009. Duke notified NRC of future planned ESP applications (as many as 2) Possibly Oconee County, SC, and Davie County, NC, no dates identified. Unspecified power company announced plans to submit an ESP application in fiscal year 2010. Combined Construction and Operating License (COL) Summary: Of nine COL applications submitted, four have been docketed for NRC review. 19 power companies, of which one is unidentified, intend to submit 22 license applications for 33 units. A Reference COL (R-COL) application has been submitted for four of the five reactor designs. Combined Construction and Operating License Applications (COLA) Submitted:

unknown authors

2008-01-01T23:59:59.000Z

145

Patent Protection and Licensing Procedure | BNL Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

BNL Inventors BNL Inventors Patent Protection and Licensing Procedure TCP Staff Assignment - Invention Disclosures received by Intellectual Property Legal Group (IPLG) will be given a BNL number, and assigned to a specific TCP staff member for commercial assessment. Henceforth, the assigned staff member will be responsible for all commercialization actions relating to the docket. Assessment - The TCP staff member assigned to the docket will meet with the inventor(s). Together they will discuss the invention and make a preliminary evaluation of potential applications and possible markets. Based on commercial assessment and a preliminary novelty determination, the TCP staff will make a recommendation to the IPLG whether to patent the invention. The TCP's decision and relevant documents will be circulated

146

License Application Chapter 5 Nuclear Criticality Safety  

E-Print Network (OSTI)

uranium or other fissile material outside of check-sources and various standards for radiological measurement calibration. As such, no criticality safety programs or procedures are maintained or implemented at the facility; however, the IIFP Integrated Safety Analysis (ISA), as documented in the ISA Summary, did evaluate the potential for a criticality accident at the IIFP Site. The only potential method of having a criticality accident at the facility involves the inadvertent receipt and processing of fissile materials, which is addressed in the ISA. Controls are established to verify that no enriched uranium hexafluoride (UF6) is received and processed at the facility. The cylinders processed at the IIFP Facility are the large, 14-ton or 10-ton UF6 tails cylinders, not the 2 -ton enriched product cylinders. Processing equipment at the plant, namely the autoclaves, is not sized to handle these smaller cylinders, so there is no method to feed enriched material into the processing plants. Additionally, each cylinder will be scanned with a detector to verify that the incoming cylinders do not contain fissile materials. The scan does not determine the shippers assay exactness for the cylinder contents, but does provide a reasonable indication if the cylinder is depleted or enriched. Both the receipt inspection and the scan for the assay at the Facility Site are maintained as Items Relied on for Safety (IROFS) controls. Also, feed suppliers (UF6 enrichment plants) have redundant and

Uranium De-conversion; Revision B

2011-01-01T23:59:59.000Z

147

PRECLOSURE CONSEQUENCE ANALYSES FOR LICENSE APPLICATION  

Science Conference Proceedings (OSTI)

Radiological consequence analyses are performed for potential releases from normal operations in surface and subsurface facilities and from Category 1 and Category 2 event sequences during the preclosure period. Surface releases from normal repository operations are primarily from radionuclides released from opening a transportation cask during dry transfer operations of spent nuclear fuel (SNF) in Dry Transfer Facility 1 (DTF 1), Dry Transfer Facility 2 (DTF 2), the Canister Handling facility (CHF), or the Fuel Handling Facility (FHF). Subsurface releases from normal repository operations are from resuspension of waste package surface contamination and neutron activation of ventilated air and silica dust from host rock in the emplacement drifts. The purpose of this calculation is to demonstrate that the preclosure performance objectives, specified in 10 CFR 63.111(a) and 10 CFR 63.111(b), have been met for the proposed design and operations in the geologic repository operations area. Preclosure performance objectives are discussed in Section 6.2.3 and are summarized in Tables 1 and 2.

S. Tsai

2005-01-12T23:59:59.000Z

148

Oconee Electrical Component Integrated Plant Assessment and Time Limited Aging Analyses for License Renewal: Parts 1 and 2  

Science Conference Proceedings (OSTI)

Duke Power Co. and Baltimore Gas and Electric Co. are the first two utilities to apply for license renewal of their nuclear units. This report is one in a series of EPRI reports providing the technical basis for the Oconee and Calvert Cliffs License Renewal Applications.

1998-11-30T23:59:59.000Z

149

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Halbach Array DC Motor/Generator Company Name 1/7 TL0_____ Date PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Lawrence Livermore National ...

150

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM  

NLE Websites -- All DOE Office Websites (Extended Search)

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Los Alamos National Security, LLC ("LANS"), under its United States Department of Energy ("DOE") Contract No. DE-AC52-06NA25396, to manage and operate Los Alamos National Laboratory ("LANL"), and ______________________________________, a _____________________________ corporation Company Name ("LICENSEE") (State of Incorporation) having its principal place of business at: ________________________________________________________________________________________ (Company Address) is effective on the date of execution by the last signing Party and payment of the License Issue Fee

151

Vehicles and Fuels Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Vehicles and Fuels Technologies Available for Licensing - Energy Innovation Portalto ...

152

Wind Energy Technologies Available for Licensing - Energy ...  

Wind Energy Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have wind energy ...

153

Yankee nuclear power station license renewal assessment  

Science Conference Proceedings (OSTI)

Nuclear power plants are initially licensed to operate for 40 years. Recent changes to US Nuclear Regulatory Commission regulations allow licenses to be renewed for up to 20 additional years. The new regulations require a comprehensive plant assessment to ensure continued effective aging management of equipment important to license renewal (ILR). Under the industry's lead plant program, Yankee Atomic Electric Company (YAEC) has assisted with development and demonstration of a generic license renewal assessment process. The generic assessment process developed under the lead plant program is the Nuclear Management and Resources Council methodology.

Hinkle, W.D. (Yankee Atomic Electric Co., Bolten, MA (United States))

1992-01-01T23:59:59.000Z

154

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Cross-Talk Free, Low-Noise Optical Amplifier Company Name 1/7 TL0_____ Date PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between ...

155

University of Colorado Technologies Available for Licensing ...  

Wind Energy; Partners (27) Visual Patent Search; Success Stories; News; Events; University of Colorado Technologies Available for Licensing The University of Colorado ...

156

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

United States Department of Energy (DOE) Contract No. DE-AC52-07NA27344 to manage ... Sale, or import of the Licensed Products, performance of ...

157

Solar Thermal Technologies Available for Licensing - Energy ...  

Solar Thermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have concentrating solar power ...

158

Sandia National Laboratories : Licensing/Technology Transfer ...  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; IP Management, Alliances & Licensing Contacts. IP Home; Search/Browse ...

159

NREL: Technology Transfer - Technologies Available for Licensing  

NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing.

160

Wind Energy Technologies Available for Licensing - Energy ...  

Site Map; Printable Version; Share this resource. Send a link to Wind Energy Technologies Available for Licensing - Energy Innovation Portalto someone by E-mail

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Energy Storage Technologies Available for Licensing - Energy ...  

Energy Storage Technologies Available for Licensing U.S. Department of Energy laboratories and participating research institutions have energy storage technologies ...

162

Startup America Technologies Available for Licensing - Energy ...  

Startup America Technologies Available for Licensing Startup America is a White House initiative to celebrate, inspire, and accelerate high-growth ...

163

Commercialization and Licensing | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Exclusive Patent License for ORNL Graphite Foam Technology January 28, 2010 - Light-emitting diode (LED) lamps are increasingly in demand in industrial and commercial...

164

Licensing - Oak Ridge National Laboratory | ORNL  

Licensing Things You Should Know about Working with ORNL. UT-Battelle manages and operates ORNL under a contract with the U.S. Department of Energy (DOE).

165

Non-exclusive License: AGMT-XXXX  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement is by and between the United States Department of...

166

Exclusive Patent License Agreement between Alliance and ...  

In such event, Alliance shall be free to license such rights to third parties without further obligation to Licensee. 8.5 Alliance agrees, ...

167

Three essays on licensing university inventions  

E-Print Network (OSTI)

of inventor(s), invention title, disclosure date, patent andphases: Phase 1 - Inventions Disclosure. The invention isDiego regarding the disclosure of inventions and licensing

Munteanu, Radu

2007-01-01T23:59:59.000Z

168

Advanced Materials Technologies Available for Licensing - Energy ...  

Advanced Materials Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have advanced materials ...

169

Geothermal Technologies Available for Licensing - Energy ...  

Site Map; Printable Version; Share this resource. Send a link to Geothermal Technologies Available for Licensing - Energy Innovation Portalto someone by E-mail

170

License  

E-Print Network (OSTI)

This report documents the program and the outcomes of Dagstuhl Seminar 11181 Organic Computing Design of Self-Organizing Systems.

Kirstie Bellman; Andreas Herkersdorf; Michael G. Hinchey; Tu Mnchen De; Andreas Herkersdorf; Mike Hinchey; Christian Mller-schloer; Hartmut Schmeck; Rolf Wrtz; Kirstie Bellman; Andreas Herkersdorf; Mike Hinchey; Christian Mller-schloer; Hartmut Schmeck; Rolf Wrtz

2011-01-01T23:59:59.000Z

171

Nondestructive Evaluation: Update on License Renewal One Time Inspection and Best NDE Practices  

Science Conference Proceedings (OSTI)

As nuclear plants enter long-term operations beyond 40 years with extended licenses, nondestructive evaluation (NDE) becomes increasingly important. This is especially true for plants that are going through the license renewal process. Many of the commitments made by more than 100 plants have submitted applications that include identification of systems, structures, and components for one-time inspection (OTI) based on suitable NDE techniques. This report provides an example of such inspection and the as...

2011-11-02T23:59:59.000Z

172

Technologies licensed | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies licensed Technologies licensed Technologies licensed Posted: July 16, 2012 - 3:49pm | Y-12 Report | Volume 9, Issue 1 | 2012 Rendering of Y-12's Access Rate Control System Wherever threatening situations arise, in-place security measures make the most of every second. On Feb. 8, a startup firm in Knoxville, Tenn., licensed two security-related technologies from the Y-12 National Security Complex that do just that. The technologies, which delay entrance to controlled-access areas, provide a security solution for various potential markets: commercial nuclear facilities, pharmaceutical manufacturers, correctional facilities and large sporting venues, as well as for other Department of Energy sites. Sustainable Environment Technologies, LLC (SET), licensed the Access Rate

173

Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Liquefied Petroleum Liquefied Petroleum Gas (Propane) License to someone by E-mail Share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Facebook Tweet about Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Twitter Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Google Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Delicious Rank Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Digg Find More places to share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Liquefied Petroleum Gas (Propane) License

174

READY-TO-SIGN NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Bullet Detection Tracking and Stopping System Company Name 1/7 TL0_____ Date READY-TO-SIGN NONEXCLUSIVE . PATENT LICENSE AGREEMENT . This license agreement ...

175

Solar and Wind Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heating Program Information Louisiana Program Type SolarWind Contractor Licensing All solar and wind energy installations must be performed by a contractor duly licensed by and...

176

LAWRENCE LIVERMORE NATIONAL LABORATORY OVERVIEW OF LLNL LICENSE ...  

one or more fields of use. ... c. Security and energy conservation; d. ... Number of Licenses Total Cost for All Licenses 1 $100,000

177

Ready-to-Sign Licensing Instructions - Industrial Partnerships ...  

Ready-to-Sign Licensing Instructions. Read the Notice for RTS License Agreement and complete Commercialization Information Form; Select a technology from the patents ...

178

Audit Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES AT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES AT DEPARTMENT-OWNED CONTRACTOR-OPERATED LABORATORIES, DOEIG-0479 Audit Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES...

179

Argonne TDC: Licensing Intellectual Property from Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Property from Argonne National Laboratory Argonne's licensing program provides companies with opportunities to acquire rights in Argonne inventions and copyrights. Licenses...

180

Technology Transfer: Success Stories: Licensed Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensed Technologies Licensed Technologies Here are some of our licensees and the technologies they are commercializing; see our Start-Up Company page for more of our technology licenses. Company (Licensee) Technology Life Technologies Corp. Cell lines for breast cancer research Bristol Myers Squibb; Novartis; Plexxikon Inc.; Wyeth Research; GlaxoSmithKline; Johnson & Johnson; Boehringer Ingelheim Pharmaceuticals, Inc.; Genzyme Software for automated macromolecular crystallography Shell International Exploration and Production; ConnocoPhillips Company; StatOil ASA; Schlumburger Technology Corportation; BHP Billiton Ltd.; Chevron Energy Technology Company; EniTecnologie S.p.A. Geo-Hydrophysical modeling software Microsoft Home Energy Saver software distribution Kalinex Colorimetric bioassay

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Amendment No.: 185. Renewed Facility Operating License  

E-Print Network (OSTI)

Brief description of amendment: The amendments revise the facility operating license to delete Section 2.G.1 of the Facility Operating License, which requires reporting of violations of the requirements in Section 2, items C(1), C(3) though (33), E, F, K, and L of the Facility Operating License. The proposed amendment would also delete Section 6.6 of the Technical Specifications (TSs) regarding reportable events. Section 6.6 of the TSs are redundant to requirements that have since been embodied in the regulations and, accordingly, may be deleted from the TS.

Virgil C. Summer Nuclear Station

2011-01-01T23:59:59.000Z

182

Monticello Lead Plant License Renewal Project Summary Report  

Science Conference Proceedings (OSTI)

This report summarizes license renewal evaluation activities from the Monticello Lead Plant License Renewal Project (MLP Project) that were conducted between October 1988 and December 1992. The lessons learned during this first plant-specific license renewal evaluation provide valuable information that utilities can use when initiating a license renewal effort.

1996-10-06T23:59:59.000Z

183

PCx END USER SOFTWARE LICENSE AGREEMENT  

PCx_lic.web.enduser. doc 7-19-06 1 PCx END USER SOFTWARE LICENSE AGREEMENT This Agreement, is made between the University of Chica go as operator of Argonne National ...

184

Invention to License: The Tech Transfer Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Invention to License: The Tech Transfer Process Speaker(s): Michael Mueller Robin C. Chiang Date: November 14, 2013 - 12:00pm - 1:00pm Location: 90-3122 Seminar HostPoint of...

185

Argument licensing and agreement in Zulu  

E-Print Network (OSTI)

In this thesis, I examine some core grammatical phenomena - case licensing, agreement, the EPP - through the lens of the Bantu language Zulu. Zulu has a number of remarkable and puzzling properties whose analysis affords ...

Halpert, Claire

2012-01-01T23:59:59.000Z

186

Technologies Recently Available for Licensing - 1999  

DOE Green Energy (OSTI)

An NREL Technology Transfer fact sheet describing four technologies that are available for licensing: steel weld weakness detection, cadmium telluride solar cell enhancement, HOMER model for choosing optimal electrical systems for remote areas, and inner-flame matrix burner.

Brown, H.; Touryan, K.

1999-09-07T23:59:59.000Z

187

Motion to Withdraw from Yucca Mountain application | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Motion to Withdraw from Yucca Mountain application Motion to Withdraw from Yucca Mountain application DOE's withdraws it's pending license application for a permanent geologic...

188

Alternative Fuels Data Center: Biodiesel Distributor License and  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Distributor Distributor License and Recordkeeping Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on AddThis.com... More in this section...

189

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hot Water Contractor Licensing Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Arkansas Program Type Solar/Wind Contractor Licensing Arkansas offers several limited, specialty licenses for solar thermal installers under the general plumbing license. There are three specialty classifications available for solar thermal installers: a Restricted Solar Mechanic license, a Supervising Solar Mechanic license, and a Solar Mechanic Trainee classification. Installers with a Restricted Solar Mechanic license can install and maintain systems used to heat domestic hot water, but are not allowed to perform any other plumbing work. Individuals holding a Supervising Solar Mechanic license are able to supervise, install

190

NRC Consent to Indirect License Transfer/Threshold Determination- Merger  

E-Print Network (OSTI)

Company ("CY"), and Yankee Atomic Electric Company ("YR") (each a "Yankee Company," and together, "the Yankee Companies"), hereby respond to the Nuclear Regulatory Commission ("NRC") Third Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination (TAC Nos. L24496, L24497, and L24498) ("RAI 3") received by the Yankee Companies on August 5, 2011. If you have questions or require additional information, please contact me or Joe Fay at (207) 350-0300. Sincerely, Wayne Norton

The Yankee Companies

2011-01-01T23:59:59.000Z

191

Nuclear Power Plant License Renewal Environmental Life Cycle Management Plan Manual: License Renewal Environmental Compliance  

Science Conference Proceedings (OSTI)

This manual focuses on preparing to meet NRC environmental requirements for license renewal. It describes a nuclear power plant's day-to-day environmental protection activities and the relationship between these activities and a plan for preparing a license renewal environmental report supplement.

1995-06-01T23:59:59.000Z

192

T-564: Vulnerabilities in Citrix Licensing administration components |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Vulnerabilities in Citrix Licensing administration 4: Vulnerabilities in Citrix Licensing administration components T-564: Vulnerabilities in Citrix Licensing administration components February 24, 2011 - 7:00am Addthis PROBLEM: Vulnerabilities in Citrix Licensing administration components. PLATFORM: Citrix Licensing Administration Console, formerly known as the License Management Console. ABSTRACT: The vulnerabilities impact all current versions of the Citrix Licensing Administration Console, formerly known as the License Management Console. reference LINKS: Citrix ID:CTX128167 SecurityTracker Alert ID:1025123 Citrix Support IMPACT ASSESSMENT: Medium Discussion: Citrix has been made aware of a number of vulnerabilities in a third-party component that is used by the Citrix Licensing administration console. These vulnerabilities could potentially allow an unauthorized user to gain

193

Alternative Fuels Data Center: Natural Gas and Propane Retailer License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Retailer License to someone by E-mail Retailer License to someone by E-mail Share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Facebook Tweet about Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Twitter Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Google Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Delicious Rank Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Digg Find More places to share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Natural Gas and Propane Retailer License Compressed natural gas, liquefied natural gas, or liquefied petroleum gas

194

Nondestructive Evaluation: Update on License Renewal One-Time Inspection and Best Nondestructive Evaluation Practices - Rev. 1  

Science Conference Proceedings (OSTI)

As nuclear plants in the United States apply for renewed licenses to extend the lifetime of their plants beyond 40 years, nondestructive evaluation (NDE) has become increasingly important. A common commitment made by U.S. plants seeking license renewal is implementation of a one-time inspection (OTI) program using suitable and applicable NDE techniques to confirm the insignificance of various potential aging effects in treated water, lubricating oil, and fuel oil environments.This ...

2013-07-30T23:59:59.000Z

195

To1 Col. A. 8. Pry., Jr. Prom L. c. Furney  

Office of Legacy Management (LM)

&arch Ll, 1917 &arch Ll, 1917 To1 Col. A. 8. Pry., Jr. Prom L. c. Furney In re: Ship!&nts to h. c. Spark Plug co. In compliance elth ,our request of January 15, 19f,7,Mentlfied ee EIDM CC&L, l survey of the reoordr of the Specie1 Materiels Seation eae made and an inventory wee anbitted b Mr. T. 0. YoDougel of the A. C. 8puk Plug compluly. Thie Laboratory requested that 530 lbe..of beryll&;as oxide and 2 lbe. of 098 be chipped to the A.. C. Sperk PLu# Company. The Individual requeste ewe as follomec c-135 150 lbs Be0 c-209 100 lbs Beii G-219 30 lb6 Be0 c-222 50 iba I&Q E-223 p-jm$ . ' .... 200 lb6 B+ 2.0 lbe UjoB the A. C. Spark Plxq Company'aartified on IebmAr'y 4, 1947 that .they have reoelrad II-05 the Uaabatkn~~Eaginoer Di&riCt 909.5 lb6 Of FWO,

196

Westinghouse P.O. Box 1970 Hanford COlTlpany Richland, Washington 99352  

Office of Scientific and Technical Information (OSTI)

Westinghouse P.O. Box 1970 Westinghouse P.O. Box 1970 Hanford COlTlpany Richland, Washington 99352 Hanford Operations and Engineering Contractor for the U S . Department of Energy under Contract DE-AC06-87RL10930 Approved for Public Release o-vrrorr 91: WHC-MR-0293 Revision 2 _-- Legend and Legacy: Fifty Years of Defense Production at the Hanford Site M. S. Gerber Date Published September 1992 Prepared for the U.S. Department of Energy Office of Environmental Restoration and Waste Manage men t 3 e f e r e n c e WHC-c: INFORMATION RELEASE REEUEST IN 0 Y 3s % - a - - Referencas Available to I n t e n d e d Audience T r a n s m i t to 00E-HQIOffice o f Scienofic and Tacnnical l n f o r m a a o n x u AurhorlRsquestor (PnnredlSignarure) $ & rnS*G&Gec #/L+ f2 lntenaed Audience u a Internal Sponsor s x t e r n

197

Technologies Applications  

E-Print Network (OSTI)

evaporation systems n Potential mining applications (produced water) nIndustry applications for which silicaLicensable Technologies Applications: n Cooling tower systems n Water treatment systems n Water needed n Decreases the amount of makeup water and subsequent discharged water (blowdown) n Enables

198

License extension for the MIT research reactor  

Science Conference Proceedings (OSTI)

On February 8, 1995, the U.S. Nuclear Regulatory Commission (NRC) amended the operating license for the Massachusetts Institute of Technology (MIT) research reactor (MITR) by extending its expiration date from May 7, 1996, to August 8, 1999. This increase of 2.25 yr in the duration of the license was for the purpose of recapturing construction time. Extensions of this type have routinely been granted to power plants. The significance of the present action is that it is the first such extension ever granted to a research reactor. This paper describes the basis for the amendment request and the supporting safety analysis.

Bernard, J.A. [Massachusetts Institute of Technology, Cambridge, MA (United States)

1995-12-31T23:59:59.000Z

199

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

200

THE SOLAR NEIGHBORHOOD. XXVI. AP Col: THE CLOSEST (8.4 pc) PRE-MAIN-SEQUENCE STAR  

Science Conference Proceedings (OSTI)

We present the results of a multi-technique investigation of the M4.5Ve flare star AP Col, which we discover to be the nearest pre-main-sequence star. These include astrometric data from the CTIO 0.9 m, from which we derive a proper motion of 342.0 {+-} 0.5 mas yr{sup -1}, a trigonometric parallax of 119.21 {+-} 0.98 mas (8.39 {+-} 0.07 pc), and photometry and photometric variability at optical wavelengths. We also provide spectroscopic data, including radial velocity (22.4 {+-} 0.3 km s{sup -1}), lithium equivalent width (EW) (0.28 {+-} 0.02 A), H{alpha} EW (-6.0 to -35 A), vsin i (11 {+-} 1 km s{sup -1}), and gravity indicators from the Siding Spring 2.3 m WiFeS, Lick 3 m Hamilton echelle, and Keck-I HIRES echelle spectrographs. The combined observations demonstrate that AP Col is the closer of only two known systems within 10 pc of the Sun younger than 100 Myr. Given its space motion and apparent age of 12-50 Myr, AP Col is likely a member of the recently proposed {approx}40 Myr old Argus/IC 2391 Association.

Riedel, Adric R.; Henry, Todd J.; Jao, Wei-Chun [Department of Physics and Astronomy, Georgia State University, Atlanta, GA 30302-4106 (United States); Murphy, Simon J. [Research School of Astronomy and Astrophysics, The Australian National University, Cotter Road, Weston Creek, ACT 2611 (Australia); Melis, Carl [Center for Astrophysics and Space Sciences, University of California, San Diego, CA 92093-0424 (United States); Subasavage, John P., E-mail: riedel@chara.gsu.edu, E-mail: thenry@chara.gsu.edu, E-mail: jao@chara.gsu.edu, E-mail: murphysj@mso.anu.edu.au, E-mail: cmelis@ucsd.edu, E-mail: jsubasavage@ctio.noao.edu [Cerro Tololo Inter-American Observatory, La Serena (Chile)

2011-10-15T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Executive Director for Operations RENEWAL OF FULL-POWER OPERATING LICENSE FOR PILGRIM NUCLEAR POWER STATION  

E-Print Network (OSTI)

This paper (1) requests that the Commission authorize the Director of the Office of Nuclear Reactor Regulation (NRR) to renew the operating license for Pilgrim Nuclear Power Station (PNPS) for an additional 20 years, and (2) informs the Commission of the results of the U.S. Nuclear Regulatory Commission (NRC) staffs review of the PNPS license renewal application (LRA) (Ref. 1) submitted by Entergy Nuclear Generation Company (Entergy Nuclear) and Entergy Nuclear Operations, Inc. (ENO) (owner and operator, respectively, of PNPS). In the Staff Requirements Memorandum for SECY-02-0088, Turkey Point Nuclear Plant, Units 3 and

R. W. Borchardt

2012-01-01T23:59:59.000Z

202

Licensing Assistance team U.S. Nuclear Regulatory Commission, Region 1  

E-Print Network (OSTI)

Division of Nuclear Materials Safety 09 / z-4 (p7- 317,7p-4) The enclosed application for Material License and one copy is being submitted for the purpose of obtaining a specific license from the United States Nuclear Regulatory Commission to obtain two cross belt analyzers. The analyzers would be utilized at the Appalachian Power Companys John E. Amos Plant in West Virginia. The Appalachian Power Company and the John E. Amos Plant are included in American Electric Power. If I can be of any further assistance please give me a call at my office telephone number

John E. Amos Plant; R. T. Carroll F; Cc Greg; Massey John; E. Amos Plant; Joe Beer; Corporate Radiation; Safety Officer Donald; C. Cook Plant

2007-01-01T23:59:59.000Z

203

Regression analysis of oncology drug licensing deal values  

E-Print Network (OSTI)

This work is an attempt to explain wide variations in drug licensing deal value by using regression modeling to describe and predict the relationship between oncology drug deal characteristics and their licensing deal ...

Hawkins, Paul Allen

2006-01-01T23:59:59.000Z

204

Multiple clues for license plate detection and recognition  

Science Conference Proceedings (OSTI)

This paper addresses a license plate detection and recognition (LPR) task on still images of trucks. The main contribution of our LPR system is the fusion of different segmentation algorithms used to improve the license plate detection. We also compare ...

Pablo Negri; Mariano Tepper; Daniel Acevedo; Julio Jacobo; Marta Mejail

2010-11-01T23:59:59.000Z

205

Alternative Fuels Data Center: License Exemptions for Biodiesel Production  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

License Exemptions for License Exemptions for Biodiesel Production for Personal Use to someone by E-mail Share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Facebook Tweet about Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Twitter Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Google Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Delicious Rank Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Digg Find More places to share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on AddThis.com...

206

RADIOLOGICAL CRITERIA FOR LICENSE TERMINATION OF URANIUM RECOVERY FACILITIES  

E-Print Network (OSTI)

radiological criteria for building surfaces and radionuclides other than radium in soil, for termination of uranium recovery licenses. SUMMARY: In a Staff Requirements Memorandum (SRM) on SECY-98-084, dated August 11, 1998 (Attachment 1), the Commission indicated that it did not object to the staff's recommendation to use the radium benchmark dose in developing a final rule applicable to uranium recovery licensees. The final rule addresses radiological criteria for decommissioning land and buildings required for license termination for uranium recovery facilities, e.g., uranium mills and in situ leach facilities (ISLs). The final rule will provide a clear and consistent regulatory basis for determining the extent to which lands and structures can be considered to be decommissioned. BACKGROUND: On August 22, 1994 (59 FR 43200), the U.S. Nuclear Regulatory Commission (NRC) published a proposed rule for comment in the Federal Register, to amend 10 CFR Part 20, "Standards for Protection Against Radiation, " to include radiological criteria for decommissioning as subpart E. The proposed rule applied to uranium mill facilities and other NRC licensees, but did not apply to mill tailings disposal or to soil radium cleanup at mills because the radiological criteria for these activities are regulated under 10 CFR Part 40, Appendix A. Some commenters recommended that the rule exempt conventional thorium and uranium mill facilities and ISLs. In SECY-97-046A, dated March 28, 1997, entitled "Final Rule on Radiological Criteria for License Termination, " the staff recommended that the final rule indicate that for uranium and thorium mill facilities the cleanup of radionuclides other than radium from soil and buildings must result in a dose no greater than the dose resulting from the cleanup of radium-contaminated soil (benchmark

William D. Travers /s

1999-01-01T23:59:59.000Z

207

Y-12 cleaning technology licensed by Knoxville engineering firm...  

National Nuclear Security Administration (NNSA)

cleaning technology licensed by Knoxville engineering firm | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the...

208

Hydrogen and Fuel Cell Technologies Available for Licensing ...  

... Energy Innovation Portal on Google; Bookmark Hydrogen and Fuel Cell Technologies Available for Licensing - Energy Innovation Portal on Delicious ...

209

SAS4A/SASSYS-1 Commercial Software License Agreement  

Licensed Program is furnished is free of manufacturing defects and damage provided that themedia has been properly installed by Licensee.

210

Oil and Water Dispersion Technology Licensing Opportunity  

E-Print Network (OSTI)

Oil and Water Dispersion Technology Licensing Opportunity Technology Brief Professor Richard can be achieved by the process of degassing. The removal of dissolved gas, for example in oil dispersions. While laboratory scale degassing is predominantly batch processed and time consuming, Professor

211

Managing license compliance in free and open source software development  

Science Conference Proceedings (OSTI)

License compliance in Free and Open Source Software development is a significant issue today and organizations using free and open source software are predominately focusing on this issue. The non-compliance to licenses in free and open source software ... Keywords: Compatibility analysis, Compliance management, Free and open source software, License compliance, Rights expression languages

G. R. Gangadharan; Vincenzo D'Andrea; Stefano Paoli; Michael Weiss

2012-04-01T23:59:59.000Z

212

Sensor network based vehicle classification and license plate identification system  

Science Conference Proceedings (OSTI)

Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, sensor network applications require data and compute intensive sensors such video cameras and microphones. In this paper, we describe the design and implementation of two such systems: a vehicle classifier based on acoustic signals and a license plate identification system using a camera. The systems are implemented in an energy-efficient manner to the extent possible using commercially available hardware, the Mica motes and the Stargate platform. Our experience in designing these systems leads us to consider an alternate more flexible, modular, low-power mote architecture that uses a combination of FPGAs, specialized embedded processing units and sensor data acquisition systems.

Frigo, Janette Rose [Los Alamos National Laboratory; Brennan, Sean M [Los Alamos National Laboratory; Rosten, Edward J [Los Alamos National Laboratory; Raby, Eric Y [Los Alamos National Laboratory; Kulathumani, Vinod K [WEST VIRGINIA UNIV.

2009-01-01T23:59:59.000Z

213

Software License Agreement | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

License Agreement License Agreement Print page Print page Email page Email page U.S. Department of Energy Office of Scientific and Technical Information Energy Science and Technology Software Center As the Office of Scientific and Technical Information's (OSTI) Energy Science and Technology Software Center (ESTSC), we are authorized to license and distribute this software to you. Upon receipt of license fee and execution of this license, the herein identified computer software package (software and accompanying documentation) is licensed, on a non-exclusive basis, to the UNDERSIGNED for use ONLY at the site designated herein below, and is to be used in accordance with this license and with the special restrictions identified below or on the software package. DOE-funded modifications, enhancements, or conversions of this

214

File:03MTDLandUseLicenseProcess (1).pdf | Open Energy Information  

Open Energy Info (EERE)

MTDLandUseLicenseProcess (1).pdf MTDLandUseLicenseProcess (1).pdf Jump to: navigation, search File File history File usage File:03MTDLandUseLicenseProcess (1).pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Full resolution ‎(1,275 × 1,650 pixels, file size: 24 KB, MIME type: application/pdf) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:05, 1 October 2012 Thumbnail for version as of 12:05, 1 October 2012 1,275 × 1,650 (24 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage The following 2 pages link to this file: GRR/Flowcharts GRR/Section 3-MT-d - Land Use License Process

215

TO :Lyall E. Johnson, Chief Licensing Branch  

Office of Legacy Management (LM)

Lyall E. Johnson, Chief Lyall E. Johnson, Chief Licensing Branch ,,,_ i-.. FROM :Clifford K. Beck, Chief q q+. ., ,,/,j !i-/ I, v' Hazards Evaluation Branch ,: s~~p:~LLItma0~7c ~HEI-IICAL wows We have reviewed the letter of December 10, 1958, from Mallinckrodt Chemical Works, requesting amendment of License No. SNM-33 to permit pelleting operations on uranium enriched to 5% U-235 in a new facility at Hematite, Missouri. Batch sizes throughout the operations will not exceed limited safe masses as specified in Report K-1019, Part 4 (Deleted). Neither the diameter nor capacity of the storage hopper located above the feed hopper of the pelleting press is given. Either the diameter should be not over the limited safe dimension or positive means should be in effect to insure against more than a limited safe m&s in the

216

NRC antitrust licensing actions, 1978--1996  

Science Conference Proceedings (OSTI)

NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

Mayer, S.J.; Simpson, J.J.

1997-09-01T23:59:59.000Z

217

Licensing : BioEnergy Science Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Available for Licensing Available for Licensing As new inventions are disclosed from BESC researchers, we will post information about the inventions on this webpage. Use the search engine below to match your technology needs with BESC disclosures or view all technologies in a particular category by clicking on the category below. View all inventions Enter keywords in the box. Separate the words with a comma (,) for multiple keywords. GO Advanced Biofuels (1 Inventions) Bioconversion (2 Inventions) Biomass Grasses (7 Inventions) Trees (1 Inventions) Genetic Tools (9 Inventions) Biotechnology (9 Inventions) Imaging (2 Inventions) PreTreatment (2 Inventions) Adams, Michael A (2 Inventions) Albersheim, Ivana G. (1 Invention) Backe, Jason (1 Invention) Bar-Peled, Maor (1 Invention) Bhave, Ramesh R (2 Inventions)

218

Carbonaceous Chemistry for Computational Modeling Licensing and Partnership Opportunity  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemistry for Computational Modeling Chemistry for Computational Modeling Opportunity The Department of Energy's National Energy Technology Laboratory (NETL) has developed a software platform entitled Carbonaceous Chemistry for Computational Modeling (C3M) that is used to access a variety of kinetic processes and reaction mechanisms typically found in coal gasification, gas clean-up, and carbon capture processes. This unique software provides the user the ability to conduct virtual kinetic experiments using leading kinetic packages and available experimental data to evaluate kinetic predictions as a function of fuel and sorbent type and/or operating conditions. A Patent Cooperation Treaty application was filed in June 2008. NETL is seeking non-exclusive licensing partners interested in implementing

219

City of Dubuque - Solar Thermal Licensing Requirement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement < Back Eligibility Construction Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Iowa Program Type Solar/Wind Contractor Licensing Provider City of Dubuque The City of Dubuque requires a Solar Thermal License in order for a person to install a solar thermal project on a home or business. The requirement does not apply to solar photovoltaics. The licensing requirement can be met one of two ways. An installer may be Solar Thermal Certified by the North American Board of Certified Energy Practitioners (NABCEP) or An installer may complete the Northeast Iowa Community College Solar Thermal Training Installers are also required to obtain a permit before altering or

220

City of Madison - Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Madison - Contractor Licensing of Madison - Contractor Licensing City of Madison - Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Water Heating Program Info State Wisconsin Program Type Solar/Wind Contractor Licensing Provider City of Madison Although the State of Wisconsin does not have any specific laws for contractors dealing with renewable energy, the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code is a requirement for a Class A-4 license for "a person desiring to enter into the business of installing, altering or repairing active solar heating equipment" as well as fee and examination details. As a result of a

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Patents Licensing and Patent Waivers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patent Licensing The DOE Invention Licensing Program provides information on licensing of DOE-owned inventions. Patent Waivers Patent Rights - Waiver Clause: This clause makes modifications to the Patent Rights clause of 48 C.F.R. 52.227-12 and should replace that clause in the contract when an advance waiver is granted. Petition form for advance waiver (PDF) to contractor of Government's title to inventions that may be made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Petition form for waiver (PDF) to contractor of Government's title to an identified invention already made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Patent Waiver Decisions:

222

Chapter 5, "License Renewal and Aging Management for Continued Service  

SciTech Connect

As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of the license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.

Naus, Dan J [ORNL] [ORNL

2013-01-01T23:59:59.000Z

223

Statement by Deputy Secretary of Energy Clay Sell on NRG's License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by Deputy Secretary of Energy Clay Sell on NRG's by Deputy Secretary of Energy Clay Sell on NRG's License Application Statement by Deputy Secretary of Energy Clay Sell on NRG's License Application September 25, 2007 - 2:49pm Addthis "Today marks the most significant and tangible step to date, towards the construction of the first new nuclear power plant in the United States in over 30 years. DOE is confident that with NRG's reactor design selection and cooperation with their partners, General Electric and Toshiba, this project will likely result in the first of many new reactors being constructed and operated in the U.S. This reactor would join an American nuclear industry that is safe, secure and has a strong record to prove it. We look forward to the continued cooperation with industrial partners and

224

2013 Licensed Professional's Guide to the ENERGY STAR Label for Commercial Buldings  

NLE Websites -- All DOE Office Websites (Extended Search)

The Licensed Professional's Guide: Understanding the Roles and Requirements for Verifying Commercial Building Applications for ENERGY STAR Certification Contents Introduction 1 Verifying the Data Checklist 6 Verifying the Statement of Energy Performance 21 Verifying the Indoor Environmental Conditions 23 Appendix A: Sample Applications for ENERGY STAR Certification 27 Appendix B: Steps to Correct Information on the Data Checklist and Statement of Energy Performance 33 The Licensed Professional's Guide 1 Introduction Energy use in commercial buildings accounts for nearly 20 percent of U.S. greenhouse gas emissions at a cost of more than $100 billion per year. Through ENERGY STAR, the United States Environmental Protection Agency (EPA) works with owners and managers of our nation's

225

Vorbeck Materials Licenses Graphene-based Battery Technologies ...  

Vorbeck Materials Licenses Graphene-based Battery Technologies Vorbeck Materials Corp of Jessup, MD participated in the Americas Next Top Energy Innovator program ...

226

LED North America Receives Exclusive Patent License for ORNL...  

NLE Websites -- All DOE Office Websites (Extended Search)

Highlights Success Stories Contact Us Index Home | ORNL | Success Stories SHARE LED North America Receives Exclusive Patent License for ORNL Technology June 19, 2013 Views...

227

Property:FERC License Issuance Date | Open Energy Information  

Open Energy Info (EERE)

Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

228

Get listed in the Directory of Licensed Professionals | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

or Province(s) in which you are a licensed Professional Engineer or Registered Architect Whether you hold a Green Building Engineer certification from the Association of...

229

Glass Furnace Model (GFM) Six-Month Trial License  

Licensed Program is furnished is free of manufacturing defects and damage provided that the media has been properly installed by Licensee.

230

Non-exclusive patent license agreement between Alliance and ...  

DRAFT FOR DISCUSSION PURPOSES ONLY Page 1 of 19 NON-EXCLUSIVE PATENT LICENSE AGREEMENT Between Alliance for Sustainable Energy, LLC And

231

NOTICE OF INTENT TO GRANT PARTIALLY EXCLUSIVE LICENSE NATIONAL ...  

Gasification Combined Cycle (IGCC) Operator Training System (OTS) Software. The software license will include source and executable copies of the IGCC Dynamic Model ...

232

LALP-05-111 Licensable Novel Zeolite Synthesis Technologies Method ...  

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA www.lanl.gov/partnerships/license/technologies/ Summary Zeolites and molecular

233

City of Madison - Contractor Licensing (Wisconsin) | Open Energy...  

Open Energy Info (EERE)

the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code...

234

City of Madison - Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code...

235

Sandia National Laboratories : Licensing/Technology Transfer News  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; News. IP Home; Search/Browse Technology Portfolios; Licensing Overview ...

236

NETL: News Release - DOE Licenses Mercury Control Patent to Help...  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2007 DOE Licenses Mercury Control Patent to Help Meet Clean Air Regulations Research Aims at Trace Element Reduction from Power Generation Facilities by 2010 Washington, DC - A...

237

MC2, Version 3.0, Software License Agreement  

Licensed Program is furnished is free of manufacturing defects and damage provided that the media has been properly installed by Licensee.

238

NETL: News Release - Licensing Agreement Moves Two NETL-Patented...  

NLE Websites -- All DOE Office Websites (Extended Search)

March 23, 2011 Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Washington, D.C. - Two new patented sorbents used for carbon dioxide...

239

Argonne, Evigia finalize licensing agreement for next-gen RFID...  

NLE Websites -- All DOE Office Websites (Extended Search)

See related New RFID technology tracks and monitors nuclear materials Argonne, Evigia finalize licensing agreement for next-gen RFID sensor technology By Angela Hardin * July 16,...

240

U.S. Department of Energy Technologies Available for Licensing ...  

U.S. Department of Energy Technologies Available for Licensing Our Mission. The mission of the Energy Department is to ensure Americas security and prosperity by ...

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Joint Responses to Audit Response Requests  

E-Print Network (OSTI)

documenting the NRC Staff s conclusions regarding a pre-application audit of Tennessee Valley Authority (TVA) and Duke Energy Carolinas (Duke) combined license (COL) application preparation activities, conducted from July 30- August 3, 2007. Because TVA's Bellefonte COL application and Duke's Lee Nuclear COL application were prepared in close coordination through NuStart and the AP 1000 Design Centered Work Group (DCWG), and because these two COL applications were prepared by the same contractor, the audits were performed essentially simultaneously. The referenced audit report requested that the audit response requests (ARRs) be addressed prior to or as part of the respective COL application submittals. Responses to the ARRs are enclosed. The ARRs in the audit report did not directly impact the content of the COL applications, and the timing of the issuance of the audit report did not facilitate a response prior to the filing of the applications.

Juan Peralta Chief; Tennessee Valley

2007-01-01T23:59:59.000Z

242

Solar and Wind Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Wind Program Info State Connecticut Program Type Solar/Wind Contractor Licensing Provider Connecticut Department of Consumer Protection The Connecticut Department of Consumer Protection (DCP) is authorized to issue licenses for solar-thermal work, solar-electric work and wind-electric work. "Solar thermal work" is defined as "the installation, erection, repair, replacement, alteration, or maintenance of active, passive and hybrid solar systems that directly convert ambient energy into heat or convey, store or distribute such ambient energy." Solar electricity

243

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Maine Program Type Solar/Wind Contractor Licensing In order to be eligible for Maine's solar thermal rebate program, systems must be installed by licensed plumbers who have received additional certification for solar thermal systems from the North American Board of Certified Energy Practitioners (NABCEP). The state solar thermal rebate program maintains a list of Efficiency Maine registered vendors/installers. In addition, Efficiency Maine has information for vendors interested in becoming registered and listed on the [http://www.efficiencymaine.com/at-home/registered-vendor-locator web

244

Include in Column B cost of all composition produced by plant. Include in Column C cost of all operations not involving printing (Col. A)  

E-Print Network (OSTI)

occupied (whether Government-owned or rented), utilities, etc. (14.5 cents per month per square foot. Amount spent for rental of equipment Total cost (Use col.A total from this line to compute cost per 1 units produced in plant this fiscal quarter Total units produced in plant this fiscal year Cost per 1

US Army Corps of Engineers

245

u c l a Col le g e R e p or t 27 In the push to develop practical hydrogen fuel cells  

E-Print Network (OSTI)

u c l a Col le g e R e p or t 27 In the push to develop practical hydrogen fuel cells to power cars hydrogen fuel that powers not only cars, but also laptop computers, cel- lular phones, digital cameras and other electronic devices. "Before this work,the challenge has been: how do you store enough hydro- gen

Grether, Gregory

246

Low-Cost Printable Wireless Sensors for Buildings Applications  

Low-Cost Printable Wireless Sensors for Buildings Applications Note: The technology described above is an early stage opportunity. Licensing rights to this ...

247

Inspection report: the Department of Energy's export licensing process for dual-use and munitions commodities  

SciTech Connect

Export of commodities, encouraged by both the private sector and the Federal Government, helps to improve our position in the global economy and is in the national interest of the US. However, exports of commodities or technologies, without regard to whether they may significantly contribute to the military potential of individual countries or combination of countries or enhance the proliferation of weapons of mass destruction, may adversely affect the national security of the US. The Federal Government, therefore, implements several laws, Executive Orders, and regulations to control the export of certain commodities and technologies. These commodities and technologies require a license for export. Some of the controlled items are designated as ''dual-use,'' that is, commodities and technologies that have both civilian and military application. Some dual-use commodities are designated as ''nuclear dual-use''--items controlled for nuclear nonproliferation purposes. Another group of controlled commodities is designated as munitions, which are goods and technologies that have solely military uses. The Department of Energy (Energy) conducts reviews of export license applications for nuclear dual-use items and certain munitions. On August 26, 1998, the Chairman of the Senate Committee on Governmental Affairs requested that the Inspectors General from the Departments of Commerce, Defense, Energy, State, and Treasury, and the Central Intelligence Agency (CIA), update and expand on a 1993 interagency review conducted by the Inspectors General of the Departments of Commerce, Defense, Energy, and State of the export licensing processes for dual-use and munitions commodities.

Friedman, Gregory H.

1999-05-01T23:59:59.000Z

248

TEAM 1 Drivers License.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

I I Core Status: new users must complete 2 training sessions and pass a sample exchange exam to work independently during Core sessions (regular work hours). Flex Status: core users must complete 5 Core sessions and pass a driving test to work during Flex sessions (evening and weekend hours). All TEAM I scheduling must be coordinated through Peter Ercius at PErcius@lbl.gov. You may only be assigned two sessions per month. CORE LICENSE TEST Safety  Understand emergency shutdown procedure  Understand potential X-ray hazards of the modified instrument and shielding  Read and understand the Low Dose Machine Authorization document  Recognize high voltage hazards with the TEAM stage  Demonstrate handling of column valves  Point out where emergency contact numbers are posted

249

Clean Fractionation: Technology Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Clean Fractionation Clean Fractionation National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Offi ce of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. NREL/FS-7A1-43959 * October 2008 Printed with a renewable-source ink on paper containing at least 50% wastepaper, including 10% postconsumer waste. You'll find more technologies available for licensing on the NREL Technology Transfer Web site at www.nrel.gov/technologytransfer/. National Renewable Energy Laboratory Innovation for Our Energy Future Biorefinery production costs are driven Insolubles Wash Cellulose pulp Lignocellulosic feedstock Solubles

250

Advanced Reactor Licensing: Experience with Digital I&C Technology in Evolutionary Plants  

Science Conference Proceedings (OSTI)

This report presents the findings from a study of experience with digital instrumentation and controls (I&C) technology in evolutionary nuclear power plants. In particular, this study evaluated regulatory approaches employed by the international nuclear power community for licensing advanced l&C systems and identified lessons learned. The report (1) gives an overview of the modern l&C technologies employed at numerous evolutionary nuclear power plants, (2) identifies performance experience derived from those applications, (3) discusses regulatory processes employed and issues that have arisen, (4) captures lessons learned from performance and regulatory experience, (5) suggests anticipated issues that may arise from international near-term deployment of reactor concepts, and (6) offers conclusions and recommendations for potential activities to support advanced reactor licensing in the United States.

Wood, RT

2004-09-27T23:59:59.000Z

251

Argonne, Evigia finalize licensing agreement for next-gen RFID sensor  

NLE Websites -- All DOE Office Websites (Extended Search)

See related See related New RFID technology tracks and monitors nuclear materials Argonne, Evigia finalize licensing agreement for next-gen RFID sensor technology By Angela Hardin * July 16, 2012 Tweet EmailPrint System enables monitoring, tracking and securing of nuclear material ANN ARBOR, Mich. and ARGONNE, Ill. (July 16, 2012)-Evigia Systems and the U.S. Department of Energy's (DOE) Argonne National Laboratory announced today that they have finalized a licensing agreement under which Argonne's patented, application-specific radio-frequency identification (RFID) sensor/seal technology and its custom-developed ARG-US software suite will be further developed and marketed by Evigia as a comprehensive nuclear and hazardous material handling solution. The system, jointly developed by Evigia and Argonne, adds sophisticated

252

PACIFICORP'S FINAL LICENSE APPLICATION KLAMATH RIVER HYDROELECTRIC PROJECT  

E-Print Network (OSTI)

all thermal power plant sites and related facilities in California with installed capacity of 50 megawatts (MW) or more. The Energy Commission's power plant siting program is fully certified under pertaining to large power plants and related facilities throughout the State of California. In carrying out

253

All Forms for Technology Partnerships Office  

Science Conference Proceedings (OSTI)

... Standard Licenses. Exclusive License; Non-Exclusive License; Research License; Patent License Application. Guest Researchers. ...

2013-06-25T23:59:59.000Z

254

COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT  

E-Print Network (OSTI)

COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT _________________________________________________________ Applicants for positions involving the operation of a commercial motor vehicle must comply with Title 49 CFR: _______________ Please list the following information for each unexpired commercial motor vehicle operator license

Roy, Subrata

255

DOE Signs Advanced Enrichment Technology License and Facility Lease |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Enrichment Technology License and Facility Lease Advanced Enrichment Technology License and Facility Lease DOE Signs Advanced Enrichment Technology License and Facility Lease December 8, 2006 - 9:34am Addthis Announces Agreements with USEC Enabling Deployment of Advanced Domestic Technology for Uranium Enrichment WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today announced the signing of a lease agreement with the United States Enrichment Corporation, Inc. (USEC) for their use of the Department's gas centrifuge enrichment plant (GCEP) facilities in Piketon, OH for their American Centrifuge Plant. The Department of Energy (DOE) also granted a non-exclusive patent license to USEC for use of DOE's centrifuge technology for uranium enrichment at the plant, which will initiate the first successful deployment of advanced domestic enrichment technology in the

256

Property:Permit/License Buildout (MW) | Open Energy Information  

Open Energy Info (EERE)

Permit/License Buildout (MW) Permit/License Buildout (MW) Jump to: navigation, search Property Name Permit/License Buildout (MW) Property Type String Pages using the property "Permit/License Buildout (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 40 + MHK Projects/Algiers Light Project + 20 + MHK Projects/Anconia Point Project + 15 + MHK Projects/Ashley Point Project + 148 + MHK Projects/Avalon Tidal + 30 + MHK Projects/Avondale Bend Project + 18 + MHK Projects/BW2 Tidal + 3 + MHK Projects/Bar Field Bend + 94 + MHK Projects/Barfield Point + 114 + MHK Projects/Bayou Latenache + 50 + MHK Projects/Bondurant Chute + 152 + MHK Projects/Breeze Point + 198 + MHK Projects/Brilliant Point Project + 56 + MHK Projects/Brough Head Wave Farm + 200 +

257

Photovoltaics at DOE's National Renewable Energy Laboratory License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

258

Photovoltaics at DOE's National Renewable Energy Laboratory License  

NLE Websites -- All DOE Office Websites (Extended Search)

ROOF-TOP LICENSE AGREEMENT KEY TERMS ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

259

NATIONAL ENERGY TECHNOLOGY LABORATORY (NETL) LICENSE ON FEDERALLY ...  

The facts set forth in this request for license are within the knowledge of the requestor and are submitted with the intention that the Director of the NETL rely on ...

260

Argonne Software Licensing: SAS4A/SASSYS-1  

BatPro software licensing ... SAS4A/SASSYS-1. The SAS4A/SASSYS-1 safety analysis code system is a simulation tool to perform deterministic transient safety analysis ...

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Y-12 cleaning technology licensed by local engineering firm ...  

NLE Websites -- All DOE Office Websites (Extended Search)

cleaning technology ... Y-12 cleaning technology licensed by local engineering firm Posted: October 31, 2012 - 10:00am MK Technologies CEO and founder Mike Carroll and director of...

262

Idaho National Engineering and Environmental Laboratory Licensing Qualification Issues  

E-Print Network (OSTI)

Idaho National Engineering and Environmental Laboratory Licensing Qualification Issues Subcommittee Meeting Oct. 28, 2002 Livermore, CA #12;Idaho National Engineering and Environmental Laboratory · Approach to Regulatory Approval · Nuclear Design Codes · Summary #12;Idaho National Engineering

263

DOCKET NO. 40-9027 LICENSE NO. LICENSEE: SUBJECT:  

E-Print Network (OSTI)

License SMC-1562, covering storage of radioactive materials at both its Revere and Reading sites in Pennsylvania. Former ore processing at the Revere facility generated waste slag contaminated with uranium and thorium. In 1988, Cabot began onsite decommissioning

unknown authors

2001-01-01T23:59:59.000Z

264

ORNL, Da Vinci Sign Licensing Agreement | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Da Vinci Sign Licensing Agreement April 12, 2012 Seated are (l to r) ORNL Partnerships Director Tom Ballard and Da Vinci CEO Kent Froelund. Standing are (l to r) Johney Green, ORNL...

265

Software Development and Licensing at the Berkeley Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

explain software licensing and distribution options available for LBNL software and how Tech Transfer can help get the job done. If you are a software developer, or you supervise...

266

Licensing of spent fuel dry storage and consolidated rod storage: A Review of Issues and Experiences  

Science Conference Proceedings (OSTI)

The results of this study, performed by Pacific Northwest Laboratory (PNL) and sponsored by the US Department of Energy (DOE), respond to the nuclear industry's recommendation that a report be prepared that collects and describes the licensing issues (and their resolutions) that confront a new applicant requesting approval from the US Nuclear Regulatory Commission (NRC) for dry storage of spent fuel or for large-scale storage of consolidated spent fuel rods in pools. The issues are identified in comments, questions, and requests from the NRC during its review of applicants' submittals. Included in the report are discussions of (1) the 18 topical reports on cask and module designs for dry storage fuel that have been submitted to the NRC, (2) the three license applications for dry storage of spent fuel at independent spent fuel storage installations (ISFSIs) that have been submitted to the NRC, and (3) the three applications (one of which was later withdrawn) for large-scale storage of consolidated fuel rods in existing spent fuel storage pools at reactors that were submitted tot he NRC. For each of the applications submitted, examples of some of the issues (and suggestions for their resolutions) are described. The issues and their resolutions are also covered in detail in an example in each of the three subject areas: (1) the application for the CASTOR V/21 dry spent fuel storage cask, (2) the application for the ISFSI for dry storage of spent fuel at Surry, and (3) the application for full-scale wet storage of consolidated spent fuel at Millstone-2. The conclusions in the report include examples of major issues that applicants have encountered. Recommendations for future applicants to follow are listed. 401 refs., 26 tabs.

Bailey, W.J.

1990-02-01T23:59:59.000Z

267

Sandia National Laboratories : Licensing/Technology ...  

Atom/Ion Traps (magnetometry, magnetoencephalography (MEG), quantum computing) Technology Summaries: Patents/Applications: Software: 21 Technology ...

268

Summary of Utility License Termination Documents and Lessons Learned: Summary of License Termination Plan Submittals by Three Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission's (NRC's) 1996 revised decommissioning regulations specify that the operator of a nuclear plant must submit a "License Termination Plan" (LTP) two years prior to termination of the plant license. The LTP explicitly defines the elements that the plant operator must address in the decommissioning plan. This report focuses on the approaches and experience gained by three of the leading plants in the preparation and submittal of their LTP submittals under the 1996 regul...

2002-10-28T23:59:59.000Z

269

SUBJECT: SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF KEWAUNEE POWER STATION (TAC NO. MD9408)  

E-Print Network (OSTI)

The license renewal application (LRA) was submitted pursuant to Title 10 of the Code of Federal Regulations Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants. " The staff determined that the LRA was complete and acceptable for docketing on September 25,2008. The staff has reviewed the KPS LRA and has developed the enclosed "Safety Evaluation Report With Open Items related to the License Renewal of the Kewaunee Power Station," hereinafter referred to as the Safety Evaluation Report (SER). This SER reflects the status of the staff's review of the LRA, requests for additional information (RAts), the applicant's responses to the staff's RAls, and other questions related to the LRA through March 26, 2010, unless otherwise noted. Issuance of the enclosed SER is an important milestone for both the applicant and the staff. The staff has identified four open items in its review which must be resolved before it can make a final determination on the application. SER Section 1.5 includes a listing of the open items with a summary of the information required to satisfactorily resolve the issues. In order to resolve these items, the staff has requested additional information, as identified in the SER.

United States; Mr. David; A. Heacock; Dear Mr. Heacock

2010-01-01T23:59:59.000Z

270

Eligibility requirements for licensed professionals | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

provide. If you're found to have falsified information on a building's application for ENERGY STAR certification, EPA reserves the right to pursue recourse through state...

271

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

government audit, the California Public Records Act, the Freedom of Information Act, or other applicable law. In-Situ Thermally Enhanced Biodegradation

272

Sandia National Laboratories : Licensing/Technology Transfer ...  

Technology Summary Sandia National Laboratories has created sensors to identify and assess the pervasive and expensive problem of corrosion in applications ranging ...

273

Battelle Memorial Institute Technologies Available for Licensing ...  

We advance scientific discovery and application by conducting $6.5 billion in global R&D ... science and math education. Our world-class research and development ...

274

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective  

SciTech Connect

Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs) that were well below the NRC DCGL screening values. This contributed to a longer than anticipated period to obtain NRC approval of the Maine Yankee License Termination Plan (LTP). By employing the lessons learned from its first LTP submittal, which was not accepted by the NRC staff, Trojan was able to obtain approval of its revised LTP promptly. While both licensees provided final status survey reports (FSSRs) for NRC approval, the Trojan approach to decommissioning and data management allowed NRC to efficiently review FSS records and supporting documentation. Therefore, NRC was able to review Trojan's FSSR more efficiently than Maine Yankee's FSSR. This paper describes the regulatory impacts of the two different approaches to the decommissioning, the development of licensee required plans, decommissioning operations and records, the differences in licensing processes, and the lessons learned for improving the processes. (authors)

Watson, B.A.; Buckley, J.T.; Craig, C.M. [U.S. Nuclear Regulatory Commission, Office of Nuclear Materials Safety and Safeguards, Decommissioning Directorate (T7E18), Washington, D.C. 20555 (United States)

2006-07-01T23:59:59.000Z

275

Air Permits, Licenses, Certifications (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program. Separate regulations exist for limiting emissions of nitrogen oxides (NOx), sulfur dioxide

276

Electrical Energy Producer's License Tax (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Producer's License Tax (Montana) Energy Producer&#039;s License Tax (Montana) Electrical Energy Producer's License Tax (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Institutional Multi-Family Residential Systems Integrator Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Fees Provider Montana Department of Revenue Each person or other organization engaged in the generation, manufacture, or production of electricity and electrical energy in the state of Montana,

277

Property:FERC License Docket Number | Open Energy Information  

Open Energy Info (EERE)

License Docket Number License Docket Number Jump to: navigation, search This is a property of type string. Pages using the property "FERC License Docket Number" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/Admirality Inlet Tidal Energy Project + P-12690 + MHK Projects/Algiers Light Project + P-12848 + MHK Projects/Anconia Point Project + P-12928 + MHK Projects/Astoria Tidal Energy + P-12665 + MHK Projects/Avalon Tidal + P-14228 + MHK Projects/Avondale Bend Project + P-12866 + MHK Projects/BW2 Tidal + P-14222 + MHK Projects/Bar Field Bend + P-12942 + MHK Projects/Barfield Point + P-13489 + MHK Projects/Bayou Latenache + P-13542 + MHK Projects/Belair Project + P-13125 + MHK Projects/Bondurant Chute + P-13477 + MHK Projects/Breeze Point + P-13480 +

278

for Renewal of Operating Licenses for Nuclear Power Plants. " The staff determined that the  

E-Print Network (OSTI)

LRA was complete and acceptable for docketing on May 15, 2009 (74 FR 22978). The staff has reviewed the PVNGS LRA, conducted site audits, issued requests for additional information (RAls), reviewed the applicant's responses to the staffs RAls, developed its "Safety Evaluation Report with Open Item Related to the License Renewal of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 " (SER with Open Item), and reviewed the applicant's comments on the SER with Open Item. The SER with Open Item was discussed at an Advisory Committee on Reactor Safeguards (ACRS) subcommittee meeting on September 8,2010. The staff has closed the open item discussed in the SER with Open Item. Section 1.5 of the attached "Safety Evaluation Report Related to the License Renewal of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 " (SER), provides a summary of the open item including actions to close the item. On the basis of this review, the staff has developed the enclosed SER to document its findings associated with the safety review of the LRA and supporting documentation. This SER is scheduled to be discussed at the ACRS full committee meeting on

United States; Mr. Randall; K. Edington

2011-01-01T23:59:59.000Z

279

NGNP High Temperature Materials White Paper  

SciTech Connect

This white paper is one in a series of white papers that address key generic issues of the combined construction and operating license (COL) pre-application program key generic issues for the Next Generation Nuclear Plant reactor using the prismatic block fuel technology. The purpose of the pre-application program interactions with the NRC staff is to reduce the time required for COL application review by identifying and addressing key regulatory issues and, if possible, obtaining agreements for their resolution

Lew Lommers; George Honma

2012-08-01T23:59:59.000Z

280

The use for frequency-consequence curves in future reactor licensing  

E-Print Network (OSTI)

The licensing of nuclear power plants has focused until now on Light Water Reactors and has not incorporated systematically insights and benefits from Probabilistic Risk Assessment (PRA). With the goal of making the licensing ...

Debesse, Laurne

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Licensing sentence-internal readings in english: an experimental study  

Science Conference Proceedings (OSTI)

Adjectives of comparison (AOCs) like same, different and similar can compare two elements sentence-internally, i.e., without referring to any previously introduced element. This reading is licensed only if a semantically plural NP ... Keywords: Bayesian statistics, acceptability judgments, adjectives of comparison, distributivity, pluralities

Adrian Brasoveanu; Jakub Dotla?il

2011-12-01T23:59:59.000Z

282

Office of Information Technology University of Minnesota 1 Software Licenses  

E-Print Network (OSTI)

, visit the Change Management website. Scheduled Maintenance The schedule of OIT maintenance windows is published on the System Status page. Should maintenance be required outside of the scheduled maintenanceSoftwareLicenseServer. If the maintenance window extends beyond anticipated end time, the System Status page will be updated accordingly

Amin, S. Massoud

283

Radiation Protection and Licensing FNAL Radiation Physics Team  

E-Print Network (OSTI)

/replace philosophy 8. Remote Handling capabilities 9. Alignment and Stability 10. Radioactive off-gas (especially shielded repair cells · Need remote handling capability · Problems during lifting and moving are difficult. January 13, 2012 Radiation Protection and Licensing #12;11 Repair Cell and Remote Handling capabilities

McDonald, Kirk

284

Revised Industry Steam Generator Program Generic License Change Package  

E-Print Network (OSTI)

License Change Package for NRC review and endorsement. Industry events during the subsequent months have delayed the NRC review and presented an opportunity for the industry to improve the submittal. A summary of the major changes from the February submittal is provided in Enclosure 1. The resulting package (Enclosures 2 through 8), which supercedes the earlier version in its entirety, is enclosed for your endorsement. Although the events of the last ten months have resulted in some changes to the industry steam generator program guidance, the fundamental principles remain sound. Equally as important, the program has demonstrated its resiliency. The steam generator program guidance is designed to accommodate new knowledge and experience, and that is precisely what is occurring. The enclosed Generic License Change Package includes changes that reflect recent experience. In addition, the appropriate underlying technical documents are currently being revised or supplemental guidance is being developed as necessary to reflect new information. The industry and the NRC worked diligently to address the technical and licensing issues that ultimately resulted in the February 2000 version of the Steam Generator Program Generic License Change Package. Although these documents have been revised since the previous submittal, the differences do not represent a change in our position on the issues.

David J. Modeen; Mr. Samuel; J. Collins; U. S. Nuclear; Regulatory Commission; Xuo Mr; Samuel J. Collins

2000-01-01T23:59:59.000Z

285

Interim On-Site Storage of Low Level Waste: Volume 1: Licensing and Regulatory Issues  

Science Conference Proceedings (OSTI)

This report is an all-inclusive resource guide for evaluating a utility's on-site storage licensing requirements. Specifically, the report offers an extensive review of licensing and regulatory documents related to on-site storage of low level waste as well as a methodology for evaluating on-site storage licensing issues.

1992-06-01T23:59:59.000Z

286

Licensing : BioEnergy Science Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Inventions Inventions 32 records A Broad Environmental Stress-Inducible Promoter and its Application in Crops A Novel Monolignol that reduces recalcitrance of plant cell walls Caloramator sp. Tolerance of Pretreatment Inhibitors from LIgnocellulosics Cellulose and xylan fermentation by novel anaerobic thermophilic clostridia isolated from self-heated biocompost Compositions and Methods for Improved Plant Feedstock Consolidated Bioprocessing Method using Thermophilic Microorganisms Engineering male sterility or non-transgenic pollen by pollen-specific expression of a restriction enzyme Flow-through Pretreatment of Lignocellulosic Biomass with Inorganic Nanoporous Membranes Gene and Gene Clusters that Enable Degradation of Recalcitrant Biological Materials Genes to Increase Growth in Monocots

287

License amendment for neutron capture therapy at the MIT research reactor  

SciTech Connect

This paper reports the issuance by the U.S. Nuclear Regulatory Commission (NRC) of a license amendment to the Massachusetts Institute of Technology (MIT) for the use of the MIT Research Reactor's (MITR-II) medical therapy facility beam for the treatment of humans using neutron capture therapy (NCT). This amendment is one of 11 required approvals. The others are those of internal MIT committees, review panels of the Tufts-New England Medical Center (NEMC), which is directing the program jointly with MIT, that of the U.S. Food and Drug Administration, and an NRC amendment to the NEMC hospital license. This amendment is the first of its type to be issued by NRC, and as such it establishes a precedent for the conduct of human therapy using neutron beams. Neutron capture therapy is a bimodal method for treating cancer that entails the administration of a tumor-seeking boronated drug followed by the irradiation of the target organ with neutrons. The latter cause boron nuclei to fission and thereby release densely ionizing helium and lithium nuclei, which destroy cancerous cells while leaving adjacent healthy cells undamaged. Neutron capture therapy is applicable to glioblastoma multiforme (brain tumors) and metastasized melanoma (skin cancer). Both Brookhaven National Laboratory and MIT conducted trials of NCT more than 30 yr ago. These were unsuccessful because the available boron drugs did not concentrate sufficiently in tumor and because the thermal neutron beams that were used did not enable neutrons to travel deep enough into the brain.

Bernard, J.A. (Massachusetts Institute of Technology, Cambride, MA (United States))

1993-01-01T23:59:59.000Z

288

Non-Class 1 Mechanical Implementation Guideline and Mechanical Tools: B&W Owners Group Generic License Renewal Program, BAW-2270, Re vision 2, 1999  

Science Conference Proceedings (OSTI)

As part of the application process for license renewal, nuclear utilities must perform an evaluation to confirm that they have appropriately considered any aging effects on plant components. A management plan must be developed for all components subject to aging effects. This report presents a set of mechanical tools for utility use in determining which aging effects are applicable to Non-Class 1 mechanical components.

2000-04-06T23:59:59.000Z

289

Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed  

NLE Websites -- All DOE Office Websites (Extended Search)

4: June 8, 2009 4: June 8, 2009 Vehicles per Licensed Driver Rising to someone by E-mail Share Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Facebook Tweet about Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Twitter Bookmark Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Google Bookmark Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Delicious Rank Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Digg Find More places to share Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on AddThis.com... Fact #574: June 8, 2009

290

GRR/Section 3-MT-d - Land Use License Process | Open Energy Information  

Open Energy Info (EERE)

d - Land Use License Process d - Land Use License Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-d - Land Use License Process 03MTDLandUseLicenseProcess (1).pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Regulations & Policies Surface Management Rule 36.25.103 Triggers None specified Click "Edit With Form" above to add content 03MTDLandUseLicenseProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The land use license is intended to be used for short-term use of state-owned lands. This license may be used for casual use of the lands

291

Regulators Experiences in Licensing and Inspection of Dry Cask Storage Facilities  

SciTech Connect

The United States Nuclear Regulatory Commission (NRC), through the combination of a rigorous licensing and inspection program, ensures the safety and security of dry cask storage. NRC authorizes the storage of spent fuel at an independent spent fuel storage installation (ISFSI) under two licensing options: site-specific licensing and general licensing. In July 1986, the NRC issued the first site-specific license to the Surry Nuclear Power Plant in Virginia authorizing the interim storage of spent fuel in a dry storage cask configuration. Today, there are over 30 ISFSIs currently licensed by the NRC with over 700 loaded dry casks. Current projections identify over 50 ISFSIs by the year 2010. No releases of spent fuel dry storage cask contents or other significant safety problems from the storage systems in use today have been reported. This paper discusses the NRC licensing and inspection experiences. (authors)

Baggett, S.; Brach, E.W. [Spent Fuel Project Office, U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2006-07-01T23:59:59.000Z

292

Applications  

Science Conference Proceedings (OSTI)

Table 6   Typical applications of duplex stainless steels...salt evaporation equipment, desalination plants, geothermal

293

Applications  

Science Conference Proceedings (OSTI)

Table 3   Wear-, erosion-, and corrosion-resistance applications of CVD...against neutron radiation

294

Key Issues for the Safety and Licensing of Fusion  

SciTech Connect

Studies of the safety and environmental impacts of fusion, both of future power plants and of ITER, have shown that a good performance can be achieved. Although it is difficult to anticipate the regulatory regime in which future fusion power stations will be licensed, the areas of public and occupational safety and short and long-term environmental impact are likely to remain important. In each of these areas, the outcome of various studies have been reviewed, leading to a list of issues which should be given attention to facilitate eventual licensing of a fusion power plant. Many of these relate to reducing conservatisms and uncertainties in the analyses, but also included are improved understanding of tritium retention and of dust generation, and development of materials to provide long component lifetimes. A full appraisal is also recommended of the viability of recycling of active materials after end of plant life.

Taylor, Neill P. [Culham Science Centre (United Kingdom)

2005-05-15T23:59:59.000Z

295

Completion of decommissioning: Monitoring for site release and license termination  

SciTech Connect

To request termination of a license upon completion of dismantling or decommissioning activities, documenting any residual radioactivity to show that the levels are environmentally acceptable will be necessary. When the regulators approve the decommissioning plan, they establish what the release criteria for the decommissioned site will be at the time of the site release and license termination. The criteria are numeric guidelines for direct radiation in soils and on surfaces. If the regulatory body finds that the measured on-site values are below the guidelines, the site will be acceptable for unrestricted release (no radiological controls or future use). If areas are found above those values, more decontamination or cleanup of these areas may be required unless the regulatory body grants an exemption.

Boing, L.E.

1997-08-01T23:59:59.000Z

296

Investing in the Energy Future: An Industry Guide to Licensing Technologies at the National Renewable Energy Laboratory (NREL) (Brochure)  

Science Conference Proceedings (OSTI)

Provides an overview of NREL's licensing opportunities and processes, and commercialization programs.

Not Available

2010-09-01T23:59:59.000Z

297

Greece licensing round to focus on western sedimentary basins  

SciTech Connect

New opportunities for international oil companies to explore for hydrocarbons in Greece will emerge shortly. Parliament ratified a new petroleum law in January 1995, and DEP-EKY SA will undertake an international licensing round for offshore-onshore areas mainly in western Greece during second half 1995. The paper describes the fold and thrust belt of western Greece; the Katakolon oil field; the tertiary basins of eastern Greece; the Prinos and Prinos North oil fields; and the Epanomi gas field.

Roussos, N.; Marnelis, F. (Public Petroleum Corp. of Greece, Athens (Greece))

1995-03-06T23:59:59.000Z

298

Albert R Meyer February 13, 2012 This work is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported License.  

E-Print Network (OSTI)

2/11/12 1 Lec 2M.1 Albert R Meyer February 13, 2012 This work is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported License. Mathematics for Computer Science MIT 6.042J/18.062J The Well Ordering Principle, III Lec 2M.2 Albert R Meyer February 13, 2012 Geometric sums

299

Applications  

Science Conference Proceedings (OSTI)

Table 8   Major markets for ABS products...Market category Applications ABS grades Major appliances Refrigerator door and food liners; crisper pans;

300

Applications  

Science Conference Proceedings (OSTI)

Table 5   Selected applications for wrought aluminum alloys...vehicles, trucks and trailers 3105 Residential siding, mobile homes, rain-carrying goods,

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

SEARCHING FOR YOUNG JUPITER ANALOGS AROUND AP COL: L-BAND HIGH-CONTRAST IMAGING OF THE CLOSEST PRE-MAIN-SEQUENCE STAR  

SciTech Connect

The nearby M-dwarf AP Col was recently identified by Riedel et al. as a pre-main-sequence star (age 12-50 Myr) situated only 8.4 pc from the Sun. The combination of its youth, distance, and intrinsically low luminosity make it an ideal target to search for extrasolar planets using direct imaging. We report deep adaptive optics observations of AP Col taken with VLT/NACO and Keck/NIRC2 in the L band. Using aggressive speckle suppression and background subtraction techniques, we are able to rule out companions with mass m {>=} 0.5-1 M{sub Jup} for projected separations a > 4.5 AU, and m {>=} 2 M{sub Jup} for projected separations as small as 3 AU, assuming an age of 40 Myr using the COND theoretical evolutionary models. Using a different set of models, the mass limits increase by a factor of {approx}>2. The observations presented here are the deepest mass-sensitivity limits yet achieved within 20 AU on a star with direct imaging. While Doppler radial velocity surveys have shown that Jovian bodies with close-in orbits are rare around M-dwarfs, gravitational microlensing studies predict that 17{sup +6}{sub -9}% of these stars host massive planets with orbital separations of 1-10 AU. Sensitive high-contrast imaging observations, like those presented here, will help to validate results from complementary detection techniques by determining the frequency of gas giant planets on wide orbits around M-dwarfs.

Quanz, Sascha P.; Avenhaus, Henning; Meyer, Michael R. [Institute for Astronomy, ETH Zurich, Wolfgang-Pauli-Strasse 27, 8093 Zurich (Switzerland); Crepp, Justin R.; Hillenbrand, Lynne A. [Department of Astrophysics, California Institute of Technology, 1200 East California Boulevard, Pasadena, CA 91125 (United States); Janson, Markus, E-mail: quanz@astro.phys.ethz.ch [Department of Astrophysical Sciences, Princeton University, Princeton, NJ 08544 (United States)

2012-08-01T23:59:59.000Z

302

U-047: Siemens Automation License Manager Bugs Let Remote Users Deny  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Siemens Automation License Manager Bugs Let Remote Users 7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code November 29, 2011 - 9:00am Addthis PROBLEM: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code. PLATFORM: Siemens Automation License Manager 500.0.122.1 ABSTRACT: Several vulnerabilities were reported in Siemens Automation License Manager. reference LINKS: SecurityTracker Alert ID: 1026354 Bugtraq Siemens Advisory Services IMPACT ASSESSMENT: Medium Discussion: A remote user can execute arbitrary code on the target system. A remote user can cause denial of service conditions. A remote user can send specially crafted *_licensekey commands to trigger a

303

GRR/Section 12-HI-a - Habitat Conservation Plan and Incidental Take License  

Open Energy Info (EERE)

2-HI-a - Habitat Conservation Plan and Incidental Take License 2-HI-a - Habitat Conservation Plan and Incidental Take License < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-HI-a - Habitat Conservation Plan and Incidental Take License 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf Click to View Fullscreen Contact Agencies Hawaii Department of Land and Natural Resources Division of Forestry and Wildlife Regulations & Policies Hawaii Revised Statutes 195D-21 Triggers None specified Click "Edit With Form" above to add content 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

304

The debate over re-licensing the Vermont Yankee nuclear power plant  

Science Conference Proceedings (OSTI)

In 2009, the NRC's Atomic Safety and Licensing Board approved a 20-year license extension for the Vermont Yankee Nuclear Power plant. Less than seven months later, the Vermont State Senate voted 26-4 to block the required certificate for public good. How did a plant seen as likely to be re-licensed become the first in 20 years to be rejected in a public vote? (author)

Watts, Richard; Hines, Paul; Dowds, Jonathan

2010-05-15T23:59:59.000Z

305

Proceedings: 2004 EPRI Topical Workshop - License Termination Plans/Final Site Release  

Science Conference Proceedings (OSTI)

One of the final challenges in plant decommissioning is that of license termination and final site release. The EPRI Decommissioning - License Termination and Final Site Release Workshop was the tenth in a series designed to aid utility personnel in decommissioning nuclear power plants. This workshop focused on specific aspects of license termination activities and final site release as they relate to decommissioning. The information presented will update utilities on developments and experience related ...

2005-09-16T23:59:59.000Z

306

Nondestructive Evaluation: Plant Aging/License Renewal Nondestructive Examination Gap Solutions and Strategies, Vol. 1  

Science Conference Proceedings (OSTI)

This report provides strategic direction to the development of nondestructive evaluation (NDE) technology and programs for the management of aging nuclear power plants and plant license renewal. Section 2 provides project proposal descriptions developed by staff of the Electric Power Research Institute (EPRI) to address issues identified by the Aging Plant NDE Working Group. Section 3 is a summary of support provided to the License Renewal Integration Working Group on NDE related to license renewal. Sect...

2008-12-22T23:59:59.000Z

307

Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992  

SciTech Connect

In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel`s caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

Not Available

1993-09-01T23:59:59.000Z

308

Management of the Licensed Bases of Advanced Nuclear Plants: Proof of Approach  

Science Conference Proceedings (OSTI)

Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its lifecycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This project adopted and demonstrated a "twin-engine" approach that integrates a program from the emerging class of concept searching tools with a mod...

2000-08-28T23:59:59.000Z

309

Review and evaluation of the RELAP5YA computer code and the Vermont Yankee LOCA (Loss-of-Coolant Accident) licensing analysis model for use in small and large break BWR (Boiling Water Reactor) LOCAS  

SciTech Connect

A review has been completed of the RELAP5YA computer code to determine its acceptability for performing licensing analyses. The review was limited to Boiling Water Reactor (BWR) reactor applications. In addition, a Loss-Of-Coolant Accident (LOCA) licensing analysis method, using the RELAP5YA computer code, has been reviewed. This method is applicable to the Vermont Yankee Nuclear Power Station to perform full break spectra LOCA and fuel cycle independent analyses. The review of the RELAP5YA code consisted of an evaluation of all Yankee Atomic Electric Company (YAEC) incorporated modifications to the RELAP5/MOD1 Cycle 18 computer code from which the licensing version of the code originated. Qualifying separate and integral effects assessment calculations were reviewed to evaluate the validity and proper implementation of the various added models. The LOCA licensing method was assessed by reviewing two RELAP5YA system input models and evaluating several small and large break qualifying transient calculations. A review of the RELAP5YA code modifications and their assessments, as well as the submitted LOCA licensing method, is given and the results of the review are provided.

Jones, J.L.

1987-01-01T23:59:59.000Z

310

Applications  

Science Conference Proceedings (OSTI)

Table 2   Applications for titanium and titanium alloys...for FGD units, nuclear waste disposal Geothermal energy Heat exchangers, evaporators, condensers, tubes Marine engineering Shipbuilding Heat exchangers, condensers, piping

311

Applications  

Science Conference Proceedings (OSTI)

Table 2   Examples of applications and parts made with vacuum infusion...small aircraft Industrial Fan blades, part for fish counting unit, toilet bowl, oil

312

Applications  

Science Conference Proceedings (OSTI)

Table 6 Selected applications for aluminum casting alloys...gears; jet engine compressor cases 356.0 Sand: flywheel castings; automotive transmission cases; oil pans; pump bodies. Permanent: machine tool parts;

313

Applications  

Science Conference Proceedings (OSTI)

Table 1   Application of sintered stainless steels...316L Photographic equipment 316L Cam cleats 304L Dishwasher components 304L Can opener gears 410L...

314

TransForum v8n2 - DeNOX Catalyst License  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Fuel Technologies Gets Worldwide License for Argonne-developed Diesel DeNOX Catalyst Argonne chemist Chris Marshall (front) displays a container of the catalyst while...

315

LA-UR-08-0123a Licensable Explosives Ordnance Disposal Using ...  

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA www.lanl.gov/partnerships/license/technologies/ Summary:

316

LALP-08-045 Licensable Lead-Free Super-Thermite Electric Matches  

Licensable Technologies Lead-Free Super-Thermite Electric Matches An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA

317

SAS4A/SASSYS-1 Educational/Nonprofit Software License Agreement  

1 SAS4A/SASSYS-1 EDUCATIONAL/NON-PROFIT SOFTWARE LICENSE AGREEMENT. This Agreement, is made between the UChicago Argonne, LLC asoperator of Argonne ...

318

Applications:  

NLE Websites -- All DOE Office Websites (Extended Search)

Applications: Applications: ● Telecommunications: cell / smartphone; multi-party secure phone calls; videoconferencing; Voice over IP (VoIP) ● Banking and financial transactions: ATM, debit / credit card and e-Commerce ● e-Business; e-gaming; e-books; e-music; e-movies; e-gambling ● Wireless internet ● Electronic voting ● Facility and vehicle access ● Information exchange for government/defense

319

Security & Defense Licenses Available | Tech Transfer | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Available Technologies Available Technologies Analytical Instrumentation Chemicals Detectors and Sensors Energy and Utilities Healthcare and Biology Information Technology and Communications Manufacturing Materials Security and Defense Transportation Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | Available Technologies | Security and Defense SHARE Security and Defense 200401423 Synthesis Method for Stable Colloids of "Naked" Metal Nanocrystals 200501549 Enhanced Detection of Toxic Agents 200501614 Robust Low-Frequency Spread-Spectrum Navigation System (Related ID # 200601627) 200501640 Secure Identification of Textiles and Other Consumer Products 200701980 Cyberspace Security Econometrics System 200701995 An Intrusion Detection System Using Quantum-mechanical

320

Safety and licensing for small and medium power reactors  

SciTech Connect

Proposed new concepts for small and medium power reactors differ substantially from traditional Light Water Reactors (LWRs). Although designers have a large base of experience in safety and licensing, much of it is not relevant to new concepts. It can be a disadvantage if regulators apply LWR rules directly. A fresh start is appropriate. The extensive interactions between industry, regulators, and the public complicates but may enhance safety. It is basic to recognize the features that distinguish nuclear energy safety from that for other industries. These features include: nuclear reactivity, fission product radiation, and radioactive decay heat. Small and medium power reactors offer potential advantages over LWRs, particularly for reactivity and decay heat.

Trauger, D.B.

1987-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Regulatory Reform and License Termination Planning in Decommissioning  

SciTech Connect

Decommissioning of commercial nuclear power plants (NPPs) must be safe and cost-effective and consider the needs of a wide range of stakeholders. The creative tension among these objectives has provided opportunities to reform the way these plants are regulated and managed in decommissioning. Enlightened and visionary leaders from the U.S. Nuclear Regulatory Commission (NRC) and industry are seizing these opportunities to create new paradigms for risk-informed regulation; creative stakeholder involvement; and effective, end-state focused, license termination planning.

Michael J. Meisner

2000-06-04T23:59:59.000Z

322

Inspection report: the Department of Energy's export licensing process for dual-use and munitions commodities  

SciTech Connect

Export of commodities, encouraged by both the private sector and the Federal Government, helps to improve our position in the global economy and is in the national interest of the US. However, exports of commodities or technologies, without regard to whether they may significantly contribute to the military potential of individual countries or combination of countries or enhance the proliferation of weapons of mass destruction, may adversely affect the national security of the US. The Federal Government, therefore, implements several laws, Executive Orders, and regulations to control the export of certain commodities and technologies. These commodities and technologies require a license for export. Some of the controlled items are designated as ''dual-use,'' that is, commodities and technologies that have both civilian and military application. Some dual-use commodities are designated as ''nuclear dual-use''--items controlled for nuclear nonproliferation purposes. Another group of controlled commodities is designated as munitions, which are goods and technologies that have solely military uses. The Department of Energy (Energy) conducts reviews of export license applications for nuclear dual-use items and certain munitions. On August 26, 1998, the Chairman of the Senate Committee on Governmental Affairs requested that the Inspectors General from the Departments of Commerce, Defense, Energy, State, and Treasury, and the Central Intelligence Agency (CIA), update and expand on a 1993 interagency review conducted by the Inspectors General of the Departments of Commerce, Defense, Energy, and State of the export licensing processes for dual-use and munitions commodities.

Friedman, Gregory H.

1999-05-01T23:59:59.000Z

323

Notices and Technology Applications, Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

223 Federal Register 223 Federal Register / Vol. 76, No. 169 / Wednesday, August 31, 2011 / Notices and Technology Applications, Building 505, 22473 Millstone Road, Patuxent River, MD 20670. The Navy, in its decisions concerning the granting of licenses, will give special consideration to existing licensees, small business firms, and consortia involving small business firms. The Navy intends to ensure that its licensed inventions are broadly commercialized throughout the United States. A Patent Cooperation Treaty application may be filed for each of the patents as noted above. The Navy intends that licensees interested in a license in territories outside of the United States will assume foreign prosecution and pay the cost of such prosecution. Authority: 35 U.S.C. 207, 37 CFR part 404.

324

Gas reactor international cooperative program interim report: United States/Federal Republic of Germany nuclear licensing comparison  

SciTech Connect

In order to compare US and FRG Nuclear Licensing, a summary description of United States Nuclear Licensing is provided as a basis. This is followed by detailed information on the participants in the Nuclear Licensing process in the Federal Republic of Germany (FRG). FRG licensing procedures are described and the rules and regulations imposed are summarized. The status of gas reactor licensing in both the U.S. and the FRG is outlined and overall conclusions are drawn as to the major licensing differences. An appendix describes the most important technical differences between US and FRG criteria.

1978-09-01T23:59:59.000Z

325

Sodium fast reactor safety and licensing research plan. Volume I.  

SciTech Connect

This report proposes potential research priorities for the Department of Energy (DOE) with the intent of improving the licensability of the Sodium Fast Reactor (SFR). In support of this project, five panels were tasked with identifying potential safety-related gaps in available information, data, and models needed to support the licensing of a SFR. The areas examined were sodium technology, accident sequences and initiators, source term characterization, codes and methods, and fuels and materials. It is the intent of this report to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for the SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the Applied Technology designation from old documents. The second cross-cutting gap is the need for a robust Knowledge Management and Preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with Applied Technology and Knowledge Management.

Sofu, Tanju (Argonne National Laboratory, Argonne, IL); LaChance, Jeffrey L.; Bari, R. (Brokhaven National Laboratory Upton, NY); Wigeland, Roald (Idaho National Laboratory, Idaho Falls, ID); Denman, Matthew R.; Flanagan, George F. (Oak Ridge National Laboratory, Oak Ridge, TN)

2012-05-01T23:59:59.000Z

326

Applications  

Science Conference Proceedings (OSTI)

Table 3   Major application areas of porous P/M materials...refining Semiconductor Particle removal process gas Bulk gas delivery systems Purifier media retainers Analysis instruments Gas/liquid chromatography Gas sampling Sensor protection Chemical processing Catalyst recovery Process gases and liquids Fluid-bed reactor products Mineral processing Coal,...

327

Applications  

Science Conference Proceedings (OSTI)

Table 3   Some applications of investment casting...Electrical equipment Electronics, radar Guns and small armaments Hand tools Jewelry Machine tools Materials handling equipment Metal working equipment Oil well drilling and auxiliary equipment Optical equipment Packaging equipment Pneumatic and hydraulic systems Prosthetic appliances Pumps Sports gear...

328

Applications  

Science Conference Proceedings (OSTI)

Table 1   Commercial applications of refractory metals and alloys by industry...Rhenium, W-Re Process industries Heating and cooling coils Tantalum, Ta-Nb Shell and tube heat exchangers Tantalum Condensers Tantalum Tantalum-clad steel vessels Tantalum Distillation towers Tantalum Valves for hot sulfuric acid service Molybdenum, tantalum, Ta-Nb Expansion joints (bellows) Tantalum...

329

Applications  

Science Conference Proceedings (OSTI)

Table 9   Applications of various polymers...bins 767 aircraft acoustical tile 767 and other Boeing aircraft brackets Airbus A320 bulk cargo floor sandwich structural panels Airbus A330-340 lower wing fairings A3XX main stair case (developmental) Beluga heavy-duty entrance floor panels Dornier 328 landing flap ribs Dornier 328 ice protection...

330

ORNL's alumina-forming austenitic alloy family licensed to Carpenter Technology Corp.  

E-Print Network (OSTI)

ORNL's alumina-forming austenitic alloy family licensed to Carpenter Technology Corp. Carpenter Technology Corp. has licensed an alumina-forming austenitic (AFA) stainless steel alloy developed under technology from the initial conception and alloy design stage to the first successful prototype alloy

331

Summary report on safety and licensing strategy support for the ABR prototype.  

SciTech Connect

Argonne National Laboratory is providing support to the US Department of Energy in the Global Nuclear Energy Partnership (GNEP) in certification of an advanced, sodium-cooled fast reactor. The reactor is to be constructed as a prototype for future commercial power reactors that will produce electricity while consuming actinides recovered from light water reactor spent fuel. This prototype reactor has been called the Advanced Burner Reactor, or ABR, and is now often referred to as the advanced recycle reactor. As part of its activities, Argonne is providing technical services to assist definition of a safety and licensing strategy for the ABR prototype, and to further implementation of the strategy. In FY06, an organizational meeting was held for DOE and its laboratory contractors to discuss licensing alternatives and review previous licensing experience for the Fast Flux Test Facility (FFTF) and the Clinch River Breeder Reactor Plant (CRBRP). Near the end of FY06, a report summarizing the discussions and conclusions was written. One of the top-level conclusions recorded in the report was a recommendation to follow a licensing strategy that included the US Nuclear Regulatory Commission (NRC) as the regulatory review and licensing authority. In FY07, activities ar Argonne to support safety and licensing progress have continued. These activities have focused on further evaluation of licensing alternatives; assessment of design, analysis, and documentation implications of licensing paths; and initial technical interactions with the Nuclear Regulatory Commission. This report summarizes FY07 activities.

Cahalan, J. E.; Nuclear Engineering Division

2007-09-18T23:59:59.000Z

332

Who Is Selling the Ivory Tower? Sources of Growth in University Licensing  

Science Conference Proceedings (OSTI)

Historically, commercial use of university research has been viewed in terms of spillovers. Recently, there has been a dramatic increase in technology transfer through licensing as universities attempt to appropriate the returns from faculty research. ... Keywords: Entrepreneurial activity, Invention disclosures, Patents, University licensing

Jerry G. Thursby; Marie C. Thursby

2002-01-01T23:59:59.000Z

333

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization March 23, 2011 - 1:00pm Addthis Washington, DC - Two new patented sorbents used for carbon dioxide (CO2) capture from coal-based power plants have moved closer to commercialization as a result of a licensing agreement between the Office of Fossil Energy's (FE) National Energy Technology Laboratory (NETL) and ADA Environmental Solutions (ADA-ES). The nonexclusive agreement facilitates negotiations on intellectual property rights, protects proprietary information, and grants non-exclusive licensing of the new technology. Under federal regulations, NETL is authorized to obtain, maintain, and own patent protection for its

334

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization March 23, 2011 - 1:00pm Addthis Washington, DC - Two new patented sorbents used for carbon dioxide (CO2) capture from coal-based power plants have moved closer to commercialization as a result of a licensing agreement between the Office of Fossil Energy's (FE) National Energy Technology Laboratory (NETL) and ADA Environmental Solutions (ADA-ES). The nonexclusive agreement facilitates negotiations on intellectual property rights, protects proprietary information, and grants non-exclusive licensing of the new technology. Under federal regulations, NETL is authorized to obtain, maintain, and own patent protection for its

335

License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms-of-use License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms-of-use  

E-Print Network (OSTI)

License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms-of-use #12;License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms-of-use #12;License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms

Flicker, Yuval

336

Proposal to negotiate the renewal of the contract for the licensing and maintenance of database management system software  

E-Print Network (OSTI)

Proposal to negotiate the renewal of the contract for the licensing and maintenance of database management system software

2008-01-01T23:59:59.000Z

337

Final Safety Evaluation Report to license the construction and operation of a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)  

Science Conference Proceedings (OSTI)

The Final Safety Evaluation Report (FSER) summarizes the US Nuclear Regulatory Commission (NRC) staff`s review of Envirocare of Utah, Inc.`s (Envirocare`s) application for a license to receive, store, and dispose of uranium and thorium byproduct material (as defined in Section 11e.(2) of the Atomic Energy Act of 1954, as amended) at a site near Clive, Utah. Envirocare proposes to dispose of high-volume, low-activity Section 11e.(2) byproduct material in separate earthen disposal cells on a site where the applicant currently disposes of naturally occurring radioactive material (NORM), low-level waste, and mixed waste under license by the Utah Department of Environmental Quality. The NRC staff review of the December 23, 1991, license application, as revised by page changes dated July 2 and August 10, 1992, April 5, 7, and 10, 1993, and May 3, 6, 7, 11, and 21, 1993, has identified open issues in geotechnical engineering, water resources protection, radon attenuation, financial assurance, and radiological safety. The NRC will not issue a license for the proposed action until Envirocare adequately resolves these open issues.

Not Available

1994-01-01T23:59:59.000Z

338

RADIOISOTOPE AND RADIATION APPLICATIONS. Quarterly Progress Report  

SciTech Connect

The study of the mechanism of free-radical formation and decay in polymeric materials was continued and extended to include an investigation of the potential application of this information to the development of novel graft copolymers. The study of postirradiation grafting techniques employing both peroxide initiation and direct grafting was continued. In addition, the effect of molecular weight on site formation was further investigated. Licenses and license applications for approximately 300 by-product material licenses were reviewed to obtain information on environmental conditions of source usage. The feasibility of testing sealed-source response to normal environments by accelerated test procedures was studied. Indications are that the approach will probably not be applicable to either vibration or abrasion stresses but may be for corrosion stresses. (auth)

Sunderman, D.N., ed.

1962-10-18T23:59:59.000Z

339

Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6  

SciTech Connect

In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

NONE

1995-08-01T23:59:59.000Z

340

Model and Analytic Processes for Export License Assessments  

SciTech Connect

This paper represents the Department of Energy Office of Nonproliferation Research and Development (NA-22) Simulations, Algorithms and Modeling (SAM) Program's first effort to identify and frame analytical methods and tools to aid export control professionals in effectively predicting proliferation intent; a complex, multi-step and multi-agency process. The report focuses on analytical modeling methodologies that alone, or combined, may improve the proliferation export control license approval process. It is a follow-up to an earlier paper describing information sources and environments related to international nuclear technology transfer. This report describes the decision criteria used to evaluate modeling techniques and tools to determine which approaches will be investigated during the final 2 years of the project. The report also details the motivation for why new modeling techniques and tools are needed. The analytical modeling methodologies will enable analysts to evaluate the information environment for relevance to detecting proliferation intent, with specific focus on assessing risks associated with transferring dual-use technologies. Dual-use technologies can be used in both weapons and commercial enterprises. A decision-framework was developed to evaluate which of the different analytical modeling methodologies would be most appropriate conditional on the uniqueness of the approach, data availability, laboratory capabilities, relevance to NA-22 and Office of Arms Control and Nonproliferation (NA-24) research needs and the impact if successful. Modeling methodologies were divided into whether they could help micro-level assessments (e.g., help improve individual license assessments) or macro-level assessment. Macro-level assessment focuses on suppliers, technology, consumers, economies, and proliferation context. Macro-level assessment technologies scored higher in the area of uniqueness because less work has been done at the macro level. An approach to developing testable hypotheses for the macro-level assessment methodologies is provided. The outcome of this works suggests that we should develop a Bayes Net for micro-level analysis and continue to focus on Bayes Net, System Dynamics and Economic Input/Output models for assessing macro-level problems. Simultaneously, we need to develop metrics for assessing intent in export control, including the risks and consequences associated with all aspects of export control.

Thompson, Sandra E.; Whitney, Paul D.; Weimar, Mark R.; Wood, Thomas W.; Daly, Don S.; Brothers, Alan J.; Sanfilippo, Antonio P.; Cook, Diane; Holder, Larry

2011-09-29T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Pricing and licensing of software products and services : a study on industry trends  

E-Print Network (OSTI)

The software product business reached the $150 billion mark at the end of 2005. The pricing and licensing of new products, maintenance services, services and service maintenance have become an important strategy to deliver ...

Nayak, Shivashis

2006-01-01T23:59:59.000Z

342

Sci Protek Signs Licensing Deal for Technology that Reduces Plant Disease |  

NLE Websites -- All DOE Office Websites (Extended Search)

Sci Protek Signs Licensing Deal for Technology that Reduces Plant Disease Sci Protek Signs Licensing Deal for Technology that Reduces Plant Disease January 06, 2011 A California based small business, Sci Proteck, Inc, has recently licensed technology developed at the Department of Energy's Oak Ridge National Laboratory (ORNL) and the University of Chicago (UChicago) to protect plants from crop diseases. Research on this new method for inducing plant pathogen resistance began in 2005 following a grant from the National Science Foundation and research support from the Office of Biological and Environmental Research of the U.S. Department of Energy. Principal developers include Timothy Tschaplinski at ORNL and Drs. Jean Greenberg and Ho Won Jung at the UChicago. ORNL and UChicago entered into an Inter-Institutional Agreement for licensing, patent prosecution, and royalty sharing.

343

Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 (thousand miles) History Reference case 1970.00 $8.69 1971.00 $9.01

344

Sodium fast reactor safety and licensing research plan. Volume II.  

SciTech Connect

Expert panels comprised of subject matter experts identified at the U.S. National Laboratories (SNL, ANL, INL, ORNL, LBL, and BNL), universities (University of Wisconsin and Ohio State University), international agencies (IRSN, CEA, JAEA, KAERI, and JRC-IE) and private consultation companies (Radiation Effects Consulting) were assembled to perform a gap analysis for sodium fast reactor licensing. Expert-opinion elicitation was performed to qualitatively assess the current state of sodium fast reactor technologies. Five independent gap analyses were performed resulting in the following topical reports: (1) Accident Initiators and Sequences (i.e., Initiators/Sequences Technology Gap Analysis), (2) Sodium Technology Phenomena (i.e., Advanced Burner Reactor Sodium Technology Gap Analysis), (3) Fuels and Materials (i.e., Sodium Fast Reactor Fuels and Materials: Research Needs), (4) Source Term Characterization (i.e., Advanced Sodium Fast Reactor Accident Source Terms: Research Needs), and (5) Computer Codes and Models (i.e., Sodium Fast Reactor Gaps Analysis of Computer Codes and Models for Accident Analysis and Reactor Safety). Volume II of the Sodium Research Plan consolidates the five gap analysis reports produced by each expert panel, wherein the importance of the identified phenomena and necessities of further experimental research and code development were addressed. The findings from these five reports comprised the basis for the analysis in Sodium Fast Reactor Research Plan Volume I.

Ludewig, H. (Brokhaven National Laboratory, Upton, NY); Powers, D. A.; Hewson, John C.; LaChance, Jeffrey L.; Wright, A. (Argonne National Laboratory, Argonne, IL); Phillips, J.; Zeyen, R. (Institute for Energy Petten, Saint-Paul-lez-Durance, France); Clement, B. (IRSN/DPAM.SEMIC Bt 702, Saint-Paul-lez-Durance, France); Garner, Frank (Radiation Effects Consulting, Richland, WA); Walters, Leon (Advanced Reactor Concepts, Los Alamos, NM); Wright, Steve; Ott, Larry J. (Oak Ridge National Laboratory, Oak Ridge, TN); Suo-Anttila, Ahti Jorma; Denning, Richard (Ohio State University, Columbus, OH); Ohshima, Hiroyuki (Japan Atomic Energy Agency, Ibaraki, Japan); Ohno, S. (Japan Atomic Energy Agency, Ibaraki, Japan); Miyhara, S. (Japan Atomic Energy Agency, Ibaraki, Japan); Yacout, Abdellatif (Argonne National Laboratory, Argonne, IL); Farmer, M. (Argonne National Laboratory, Argonne, IL); Wade, D. (Argonne National Laboratory, Argonne, IL); Grandy, C. (Argonne National Laboratory, Argonne, IL); Schmidt, R.; Cahalen, J. (Argonne National Laboratory, Argonne, IL); Olivier, Tara Jean; Budnitz, R. (Lawrence Berkeley National Laboratory, Berkeley, CA); Tobita, Yoshiharu (Japan Atomic Energy Agency, Ibaraki, Japan); Serre, Frederic (Centre d'%C3%94etudes nucl%C3%94eaires de Cadarache, Cea, France); Natesan, Ken (Argonne National Laboratory, Argonne, IL); Carbajo, Juan J. (Oak Ridge National Laboratory, Oak Ridge, TN); Jeong, Hae-Yong (Korea Atomic Energy Research Institute, Daejeon, Korea); Wigeland, Roald (Idaho National Laboratory, Idaho Falls, ID); Corradini, Michael (University of Wisconsin-Madison, Madison, WI); Thomas, Justin (Argonne National Laboratory, Argonne, IL); Wei, Tom (Argonne National Laboratory, Argonne, IL); Sofu, Tanju (Argonne National Laboratory, Argonne, IL); Flanagan, George F. (Oak Ridge National Laboratory, Oak Ridge, TN); Bari, R. (Brokhaven National Laboratory, Upton, NY); Porter D. (Idaho National Laboratory, Idaho Falls, ID); Lambert, J. (Argonne National Laboratory, Argonne, IL); Hayes, S. (Idaho National Laboratory, Idaho Falls, ID); Sackett, J. (Idaho National Laboratory, Idaho Falls, ID); Denman, Matthew R.

2012-05-01T23:59:59.000Z

345

Proceedings: Decommissioning--License Termination Plans and Final Site Release Workshop  

SciTech Connect

This report presents the proceedings of an EPRI workshop dealing with the subject of decommissioning license termination and final site release. The workshop was the ninth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. It focused on specific aspects of license termination activities and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecting the best practices and technologies

None

2004-03-01T23:59:59.000Z

346

Guide to Assessing Radiological Elements for License Termination of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report provides guidance in the preparation of a License Termination Plan (LTP) to utilities engaged in nuclear plant decommissioning. The U.S. Nuclear Regulatory Commission (NRC) requires utilities to submit the LTP document years prior to the site license termination. This report focuses on the radiological components of the LTP. It identifies and addresses the regulatory requirements of each element in a way useful to the utility end user.

2002-06-12T23:59:59.000Z

347

Proceedings: Decommissioning--License Termination Plans and Final Site Release Workshop  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI workshop dealing with the subject of decommissioning license termination and final site release. The workshop was the ninth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. It focused on specific aspects of license termination activities and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecti...

2004-04-13T23:59:59.000Z

348

Decommissioning: License Termination and Final Site Release: Proceedings of EPRI Technical Workshop, October 2001  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI workshop on decommissioning license termination and final site release. The workshop was the eighth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. This workshop focused on specific aspects of license termination and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecting the best practices an...

2002-02-08T23:59:59.000Z

349

Department of Energy interest and involvement in nuclear plant license renewal activities  

SciTech Connect

Recognizing the importance of nuclear license renewal to the nation's energy strategy, the Department of Energy (DOE) initiated a plant lifetime improvement program during 1985 to determine the feasibility of the license renewal option for US nuclear plants. Initial activities of the DOE program focused on determining whether there were technical and economic obstacles that might preclude or limit the successful implementation of the license renewal option. To make this determination, DOE cosponsored with the Electric Power Research Institute (EPRI) pilot-plant efforts by Virginia Electric Power and Northern States Power. Both pilot-plant efforts concluded that life extension is technically and economically feasible. In parallel with the pilot-plant activities, DOE performed national economic studies that demonstrated the economic desirability of life extension. Having demonstrated the feasibility of life extension, DOE, in conjunction with EPRI, selected two lead plants to demonstrate the license renewal process. These lead plants are Yankee Atomic's Yankee Rowe facility and Northern States Power's Monticello facility. DOE also initiated activities to develop the technical and regulatory bases to support the license renewal process in the United States. DOE has recently identified nuclear plant license renewal to be an important element of its National Energy Strategy. This paper summarizes the significant results, conclusions, and ongoing activities of the DOE effort. 18 refs.

Bustard, L.D. (Sandia National Labs., Albuquerque, NM (USA)); Harrison, D.L. (USDOE Assistant Secretary for Nuclear Energy, Washington, DC (USA). Office of LWR Safety and Technology)

1991-01-01T23:59:59.000Z

350

Project licensing plan for UMTRA (Uranium Mill Tailings Remedial Action) sites  

SciTech Connect

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process ( Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs.

Not Available

1984-07-01T23:59:59.000Z

351

Accepting Mixed Waste as Alternate Feed Material for Processing and Disposal at a Licensed Uranium Mill  

SciTech Connect

Certain categories of mixed wastes that contain recoverable amounts of natural uranium can be processed for the recovery of valuable uranium, alone or together with other metals, at licensed uranium mills, and the resulting tailings permanently disposed of as 11e.(2) byproduct material in the mill's tailings impoundment, as an alternative to treatment and/or direct disposal at a mixed waste disposal facility. This paper discusses the regulatory background applicable to hazardous wastes, mixed wastes and uranium mills and, in particular, NRC's Alternate Feed Guidance under which alternate feed materials that contain certain types of mixed wastes may be processed and disposed of at uranium mills. The paper discusses the way in which the Alternate Feed Guidance has been interpreted in the past with respect to processing mixed wastes and the significance of recent changes in NRC's interpretation of the Alternate Feed Guidance that sets the stage for a broader range of mixed waste materials to be processed as alternate feed materials. The paper also reviews the le gal rationale and policy reasons why materials that would otherwise have to be treated and/or disposed of as mixed waste, at a mixed waste disposal facility, are exempt from RCRA when reprocessed as alternate feed material at a uranium mill and become subject to the sole jurisdiction of NRC, and some of the reasons why processing mixed wastes as alternate feed materials at uranium mills is preferable to direct disposal. Finally, the paper concludes with a discussion of the specific acceptance, characterization and certification requirements applicable to alternate feed materials and mixed wastes at International Uranium (USA) Corporation's White Mesa Mill, which has been the most active uranium mill in the processing of alternate feed materials under the Alternate Feed Guidance.

Frydenland, D. C.; Hochstein, R. F.; Thompson, A. J.

2002-02-26T23:59:59.000Z

352

My initial thoughts are, first, that, as you pointed out last week, the question put to the three Commissioners was whether they would object to the policy decision to withdraw the license application, not whether they had firm positions on the legality  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BEFORE THE COMMISSION In the Matter of U.S. DEPARTMENT OF ENERGY (High Level Waste Repository Construction Authorization Application) ) ) ) ) ) ) ) July 19, 2010 Docket No. 63-001-HLW U.S. DEPARTMENT OF ENERGY'S RESPONSE TO THE MOTION FOR RECUSAL/DISQUALIFICATION The States of Washington and South Carolina, Aiken County, and White Pine County ("Movants"), in an opportunistic and untimely attempt to disable this Commission from performing its statutory duties, have filed a Motion for Recusal/Disqualification ("Motion") to remove Commissioners Magwood and Ostendorff from considering any issue associated with the appeal of LBP-10-11. 1 There is no basis in law or fact for this Motion, and it should be promptly denied. Indeed, in the circumstances presented here, granting the motion would be an abdication

353

Inspection of the Department`s export licensing process for dual-use and munitions commodities  

Science Conference Proceedings (OSTI)

The purpose of our inspection was to review the Department of Energy`s (Energy) export licensing process for dual-use and military (munitions) commodities subject to nuclear nonproliferation controls. Specifically, we reviewed Energy`s authorities, procedures, and policies pertaining to the export licensing process and examined procedures for safeguarding data transmitted between Energy and other agencies involved in the export licensing process. We also reviewed Energy`s role as a member of the Subgroup on Nuclear Export Coordination. Our review of the sample of 60 export cases did not find evidence to lead us to believe that Energy`s recommendations for these cases were inappropriate or incorrect. We identified, however, problems regarding management systems associated with the export license review process. We found that without documentation supporting export licensing decisions by the Export Control Operations Division (ECOD), we could not determine whether ECOD analysts considered all required criteria in their review of export cases referred to Energy. For example, we found that the ECOD did not retain records documenting the bases for its advice, recommendations, or decisions regarding its reviews of export license cases or revisions to lists of controlled commodities and, therefore, was not in compliance with certain provisions of the Export Administration Act, as amended, and Energy records management directives. Additionally, we found that the degree of compliance by Energy with the export licensing review criteria contained in the Export Administration Regulations and the Nuclear Non-Proliferation Act of 1978 could not be determined because ECOD did not retain records documenting the bases for its advice and recommendations on export cases.

Not Available

1993-08-10T23:59:59.000Z

354

Support for Licensing of Nuclear Power Plants and Fuel Cycle...  

NLE Websites -- All DOE Office Websites (Extended Search)

have been reviewing applications for the construction and operation of new reactors and uranium enrichment facilities. Since 2007, after a hiatus of approximately 30 years, the...

355

LALP-10-036 Licensable Quantum Enabled Security (QES) Technologies ...  

Applications: n In todays technological world, the Secure communication over optical or free space networks n Financial networks n Transparent access networks:

356

New Licensing Agreement Opens Energy Patents to NGOs, Non-Profits |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Licensing Agreement Opens Energy Patents to NGOs, Non-Profits Licensing Agreement Opens Energy Patents to NGOs, Non-Profits New Licensing Agreement Opens Energy Patents to NGOs, Non-Profits February 17, 2012 - 11:20am Addthis To reduce the amount of firewood Darfur refugees need, Berkeley Lab scientist Ashok Gadgil and colleagues modified an existing cookstove design to create one that is 75 percent more energy-efficient than the three-stone stove traditionally used in Darfur, and is appropriate to the environmental conditions and food preferences of the local inhabitants. | Photo courtesy of Lawrence Berkeley National Laboratory. To reduce the amount of firewood Darfur refugees need, Berkeley Lab scientist Ashok Gadgil and colleagues modified an existing cookstove design to create one that is 75 percent more energy-efficient than the three-stone

357

The Brazilian Audit Tribunal's role in improving the federal environmental licensing process  

SciTech Connect

This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

Lima, Luiz Henrique, E-mail: luizhlima@terra.com.b [Rio de Janeiro Federal University, Alberto Luiz Coimbra Postgraduate Institute of Engineering Research, Energy Planning Program (Brazil); Magrini, Alessandra, E-mail: ale@ppe.ufrj.b [Rio de Janeiro Federal University, Alberto Luiz Coimbra Postgraduate Institute of Engineering Research, Energy Planning Program (Brazil); Centro de Tecnologia - Bloco C Sala 211, Ilha do Fundao, 21949-900 - Rio de Janeiro, Caixa-Postal: 68565, RJ (Brazil)

2010-02-15T23:59:59.000Z

358

Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

359

Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

360

Nuclear Maintenance Applications Center: Motor Management Guide Supporting Plant License Renewal Including Environmental Qualification Considerations  

Science Conference Proceedings (OSTI)

This report was developed by the Electric Power Research Institutes Large Electric Motor Users Group Information Working Group, which includes motor engineers, motor specialist consultants, and vendors. Environmental qualification (EQ) program owners were also involved in the development of this report. This report addresses the most important elements of a sound motor management program to support an informed decision on motor preservation and motor life extension. Motor life extensions of ...

2013-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Business Ymwet Centlsaem: Enclosed is AEC Special Nuclear Material License Yo. SW-551, as  

Office of Legacy Management (LM)

c-ii 3-y c-ii 3-y !WL?DF!i 70.424 SW-551, 9s renewed AUG 9 196s cmhustian En&merin~, Inc. %.lelcar Division tYindter, Connecticut ,~ttentionr ?tr. 5. ff. Shfp,penbmg: Business Ymwet Centlsaem: Enclosed is AEC Special Nuclear Material License Yo. SW-551, as renewed. Very tTuly yours, fkmald A. Nusshauaer, Chief Saurce 4 Specfel Wcleer Yaterials Brmch Ofvision of Meterbls Licensing EnClOSUWl W W m , as renwed DISTRIBUTION: Ccaplianee, HQs 2 w/encl. H. j. McAlduff, OR00 w/encl. D. George, ?MM w/mcl. N. Dtilos, ML w/emCl, C. Luke, ML w/end. Br. RF w/encl. Div. RF w/o encl. UNITED STATES ATOMIC ENERGY COMMISSION SPECIAL NUCLEAR MATERIAL LICENSE Pursuant to the Atomic Energy Act of 1954 and Title 10, Code of Federal Regulations, Chapter 1, Part 70, "Special Nuclear Material Regulations," a license is hereby issued authorizing the licensee

362

Utility Activities for Nuclear Power Plant Life Cycle Management and License Renewal  

Science Conference Proceedings (OSTI)

This report provides guidance to nuclear utilities on steps to take, industry activities undertaken, and products developed for life cycle management and license renewal (LCM/LR) activities. It provides information for establishing LCM/LR programs and may be useful to those underway.

1995-06-27T23:59:59.000Z

363

Licensed fuel facility status report: Inventory difference data, January 1986-June 1986  

SciTech Connect

NRC is committed to the periodic publication of licensed fuel facilities' inventory difference data, following agency review of the information and completion of any related investigations. Information in this report includes inventory difference data for active fuel fabrication facilities possessing more than one effective kilogram of high enriched uranium, low enriched uranium, plutonium, or uranium-233.

1987-02-01T23:59:59.000Z

364

Licensed fuel facility status report: Inventory difference data, July 1986-December 1986  

SciTech Connect

NRC is committed to the periodic publication of licensed fuel facilities' inventory difference data, following agency review of the information and completion of any related investigations. Information in this report includes inventory difference data for active fuel fabrication facilities possessing more than one effective kilogram of high enriched uranium, low enriched uranium, plutonium, or uranium-233.

1987-08-01T23:59:59.000Z

365

AvAilAble for licensing Battery overcharge protection, increased safety and long-term stability.  

E-Print Network (OSTI)

AvAilAble for licensing Battery overcharge protection, increased safety and long-term stability of lithium-ion batteries. The electrolytes can be alkali metal salts or polar aprotic solvents of overcharge tolerance--the dangerous voltage of the battery will never be reached even when over

Kemner, Ken

366

License Transfer For The Proposed Merger Qf Duke Energy Corporation And Progress Energy  

E-Print Network (OSTI)

(ML11110A031)) 2. NRC e-mail from Brenda L. Mozafari titled, CPL and FPL Indirect License Transfer (TAC No. ME5970), dated July 22, 2011 3. Progress Energy letter from James Scarola to the NRC Document Control Desk titled, Response

Docket No

2011-01-01T23:59:59.000Z

367

Journal of Mathematical Economics 21 (1992) 483-508. North-Holland Optimal licensing  

E-Print Network (OSTI)

* of cost-reducing Morton I. Kamien** Northwestern University, Evanston IL, USA Shmuel S. Oren University of Calijornia, Berkeley CA, USA Yair Tauman State University of New York at Stony Brook, Stony Brook NY, USA of demand functions than linear ones. Second, we derive a simple optimal licensing mechanism

Oren, Shmuel S.

368

AvAilAble for licensing Increased battery capacity, safety, stability and reliability at lower cost.  

E-Print Network (OSTI)

cost. The Invention A composite material suitable for use in an anode for a lithium-ion battery and reliability; Lowers battery cost; and Could exceed the technical specifications for electrified vehicles AvAilAble for licensing Increased battery capacity, safety, stability and reliability at lower

Kemner, Ken

369

Occupational radiation Exposure at Agreement State-Licensed Materials Facilities, 1997-2010  

SciTech Connect

The purpose of this report is to examine occupational radiation exposures received under Agreement State licensees. As such, this report reflects the occupational radiation exposure data contained in the Radiation Exposure Information and Reporting System (REIRS) database, for 1997 through 2010, from Agreement State-licensed materials facilities.

U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research

2012-07-07T23:59:59.000Z

370

Tri-State Synfuels Project Review: Volume 8. Commercial status of licensed process units. [Proposed Henderson, Kentucky coal to gasoline plant; licensed commercial processes  

DOE Green Energy (OSTI)

This document demonstrates the commercial status of the process units to be used in the Tri-State Synfuels Project at Henderson, Kentucky. The basic design philosophy as established in October, 1979, was to use the commercial SASOL II/III plants as a basis. This was changed in January 1982 to a plant configuration to produce gasoline via a methanol and methanol to gasoline process. To accomplish this change the Synthol, Oil workup and Chemical Workup Units were eliminated and replaced by Methanol Synthesis and Methanol to Gasoline Units. Certain other changes to optimize the Lurgi liquids processing eliminated the Tar Distillation and Naphtha Hydrotreater Units which were replaced by the Partial Oxidation Unit. The coals to be gasified are moderately caking which necessitates the installation of stirring mechanism in the Lurgi Dry Bottom gasifier. This work is in the demonstration phase. Process licenses either have been obtained or must be obtained for a number of processes to be used in the plant. The commercial nature of these processes is discussed in detail in the tabbed sections of this document. In many cases there is a list of commercial installations at which the licensed equipment is used.

Not Available

1982-06-01T23:59:59.000Z

371

STATEMENT OF CONSIDERATIONS REQUEST BY CHEMICAL RESEARCH AND LICENSING COMPANY FOR AN  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 12:09 FR IPL DOE CH 630 252 2??9 TO RGCP-HO P. 02/03 4 12:09 FR IPL DOE CH 630 252 2??9 TO RGCP-HO P. 02/03 * * STATEMENT OF CONSIDERATIONS REQUEST BY CHEMICAL RESEARCH AND LICENSING COMPANY FOR AN ADVANCE WAIVER OF PATENT RIGHTS UNDER DOE COOPERATIVE AGREEMENT NO- DE-FC36-04G014152; ENTITLED "ADVANCES IN PROCESS INTENSIFICATION THROUGH MULTI-FUNCTIONAL REACTOR ENGINEERING"; W(A)-04-057;CH-1227 As set out in the attached waiver petition and in subsequent discussions with DOE Patent Counsel, Chemical Research and Licensing Company (CR&L) has requested an advance waiver of domestic and foreign patent rights for all subject inventions made under the above-identified cooperative agreement by its employees and its subcontractors' employees, regardless of tier, except inventions made by subcontractors eligible to retain title to inventions

372

Special Report on "Allegations of Conflict of Interest Regarding Licensing of PROTECT by Argonne National Laboratory"  

SciTech Connect

In February 2009, the Office of Inspector General received a letter from Congressman Mark Steven Kirk of Illinois, which included constituent allegations that an exclusive technology licensing agreement by Argonne National Laboratory was tainted by inadequate competition, conflicts of interest, and other improprieties. The technology in question was for the Program for Response Options and Technology Enhancements for Chemical/Biological Terrorism, commonly referred to as PROTECT. Because of the importance of the Department of Energy's technology transfer program, especially as implementation of the American Recovery and Reinvestment Act matures, we reviewed selected aspects of the licensing process for PROTECT to determine whether the allegations had merit. In summary, under the facts developed during our review, it was understandable that interested parties concluded that there was a conflict of interest in this matter and that Argonne may have provided the successful licensee with an unfair advantage. In part, this was consistent with aspects of the complaint from Congressman Kirk's constituent.

None

2009-08-01T23:59:59.000Z

373

Low-Voltage Environmentally-Qualified Cable License Renewal Industry Report -- Revision 1  

Science Conference Proceedings (OSTI)

Low-voltage environmentally-qualified cable components have been evaluated relative to the effects of age-related degradation mechanisms; the capability of current design limits, inservice examination, testing, repair, refurbishment, and other programs to manage these effects; and the assurance that these cable components can continue to perform their intended safety functions in the license renewal term. This industry report (IR), one of a series of ten, provides a generic technical basis for evaluation...

1994-07-01T23:59:59.000Z

374

Decommissioning of the Nuclear Licensed Facilities at the Fontenay aux Roses CEA Center  

SciTech Connect

This is a summary of the program for the decommissioning of all the CEA's facilities in Fontenay aux Roses. The particularity of this center is that it is located in a built-up area. Taking into account the particularities of the various buildings and the levels of radioactivity in them, it was possible to devise a coherent, optimized program for the CEA-FAR licensed nuclear facility decommissioning operations.

Jeanjacques, Michel; Piketty, Laurence; Mandard, Lionel; Pedron, Guy; Boissonneau, Jean Francois; Fouquereau, Alain; Pichereau, Eric; Lethuaire, Nathalie; Estivie, David; Binet, Cedric; Meden, Igor [Commissariat a l'Energie Atomique, Direction de l'Energie Nucleaire, Direction deleguee des Activites Nucleaires de Saclay, Departement des Reacteurs et des Services Nucleaires, Service d'Assainissement de Fontenay Aux Roses : 18, route du Panorama, BP6, 92265 Fontenay aux Roses Cedex (France)

2008-01-15T23:59:59.000Z

375

State of California BOARD OF EQUALIZATION CIGARETTE AND TOBACCO PRODUCTS LICENSING ACT REGULATIONS  

E-Print Network (OSTI)

When a businesss license is suspended, revoked, or is subject to civil or criminal citation, then the parties to a proposed or completed transfer or sale of the business must, at the Boards request, provide all relevant information on the transfer or sale to the Excise Taxes Division, including, but not limited to, the purchase agreement, all escrow documents and proof of

unknown authors

2006-01-01T23:59:59.000Z

376

Licensing and {open_quotes}CRADA`s{close_quotes} in Oak Ridge technology transfer  

SciTech Connect

In the belief that effective technology transfer is a ``contact sport,`` Martin Marietta Energy Systems (Energy Systems), the Department of Energy`s (DOE`s) management contractor in Oak Ridge, Tennessee, encourages its research and engineering employees to directly interact with their commercial-sector counterparts. Over the years, relationships which have been initiated through such technical interactions have led to many of the patent licenses ad cooperative research and development agreements (CRADAs) which currently exist among Energy Systems, US companies, universities, and industrial consortia. The responsibility for creating and implementing Energy Systems policies and procedures to accomplish DOE`s technology transfer objectives in Oak Ridge lies with the Office of Technology Transfer (OTT). In addition, licensing executives within OTT are responsible for negotiating the terms and conditions of patent licenses and CRADAs for the commercialization of government-funded technologies and research expertise. Other technology transfer initiatives in Oak Ridge help companies in a wide range of industries overcome manufacturing obstacles, enabling them to retain existing jobs and to create new business opportunities.

Prosser, G.A.

1993-10-01T23:59:59.000Z

377

STATEMENT OF CONSIDERATIONS PETITION FOR ADVANCE WAIVER OF PATENT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction and Operating License ("COL") process under 10 CFR 52 to promote new Nuclear Power Plant ("NPP") construction in the United States. This work is funded under...

378

Nepal: Applications of Renewable Energy Technologies | OpenEI  

Open Energy Info (EERE)

Nepal: Applications of Renewable Energy Technologies Nepal: Applications of Renewable Energy Technologies Dataset Summary Description (Abstract): Wind, biomass, bio-gas, photovoltaic and small hydro renewable energy technologies in Nepal (Purpose): SWERA Documentation Source Alternate Energy Promotion Centre Date Released December 02nd, 2003 (10 years ago) Date Updated October 20th, 2007 (7 years ago) Keywords biomass documentation GEF Nepal renewable energy small hydro solar SWERA UNEP wind Data application/pdf icon Download Document (pdf, 1.6 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Time Period 2002 License License Other or unspecified, see optional comment below Comment Please cite publication as follows: AEPC,2003. Nepal: Applications of Renewable Energy Technologies, Alternate Energy Promotion Centre, Nepal. GEF UNEP SWERA. Available from http://swera.unep.net on 2 December 2003.

379

DOE Defends Its Motion to Withdraw Yucca Mountain Application | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Defends Its Motion to Withdraw Yucca Mountain Application Defends Its Motion to Withdraw Yucca Mountain Application DOE Defends Its Motion to Withdraw Yucca Mountain Application May 27, 2010 - 2:22pm Addthis Today, the United States Department of Energy filed with the NRC's Atomic Safety and Licensing Board a reply brief making clear that its motion to withdraw the pending application to license the Yucca Mountain geologic repository is authorized by the Atomic Energy Act (AEA) and consistent with the Nuclear Waste Policy Act (NWPA). As today's filing details, the AEA vests the Department with broad authority over the disposal of spent nuclear fuel and high-level radioactive waste. The NWPA does not strip the Department of that authority or otherwise compel the Department to go forward with the construction of the Yucca Mountain repository. Rather, the

380

DOE Defends Its Motion to Withdraw Yucca Mountain Application | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Its Motion to Withdraw Yucca Mountain Application Its Motion to Withdraw Yucca Mountain Application DOE Defends Its Motion to Withdraw Yucca Mountain Application May 27, 2010 - 2:22pm Addthis Today, the United States Department of Energy filed with the NRC's Atomic Safety and Licensing Board a reply brief making clear that its motion to withdraw the pending application to license the Yucca Mountain geologic repository is authorized by the Atomic Energy Act (AEA) and consistent with the Nuclear Waste Policy Act (NWPA). As today's filing details, the AEA vests the Department with broad authority over the disposal of spent nuclear fuel and high-level radioactive waste. The NWPA does not strip the Department of that authority or otherwise compel the Department to go forward with the construction of the Yucca Mountain repository. Rather, the

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20  

Science Conference Proceedings (OSTI)

The US Nuclear Regulatory Commission`s monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1996-06-01T23:59:59.000Z

382

Reference: Additional Radiation Dose Information Supporting the License Amendment Request to Permit Uprated Power Operation  

E-Print Network (OSTI)

In the referenced letter, Commonwealth Edison Company, now Exelon Generation Company (EGC), LLC, submitted a request for changes to the operating licenses and Technical Specifications for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2, to allow operation with an extended power uprate. In an August 7, 2001, teleconference between representatives of EGC and Mr. L. W. Rossbach and other members of the NRC, the NRC requested additional information regarding these proposed changes. The attachment to this letter provides the requested information. Should you have any questions concerning this letter, please contact Mr. A. R. Haeger at (630) 657-2807.

Exelon Genetation; K. A. Ainger

2001-01-01T23:59:59.000Z

383

NRC Regulatory Issue Summary on EPRI Digital Licensing Guideline, TR-102348 (NEI 01-01)  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) issued this regulatory issue summary (RIS) to announce that the NRC has reviewed the EPRI / Nuclear Energy Institute (NEI) Joint Task Force Report entitled "Guideline on Licensing Digital Upgrades: EPRI TR-102348, Revision 1, NEI 01-01: A Revision of EPRI TR-102348 To Reflect Changes to the 10 CFR 50.59 Rule," and has endorsed the report for use as guidance in designing and implementing digital upgrades to instrumentation and control systems. The attached safe...

2004-01-16T23:59:59.000Z

384

Licensing Instructions  

Operated by Lawrence Livermore National Security, LLC, for the Department of Energy's National Nuclear Security Administration

385

Licensing Guide and Sample License  

NLE Websites -- All DOE Office Websites (Extended Search)

TEI:HNOL06Y TRANSFER WORKIN6 6ROUP TEI:HNOL06Y TRANSFER WORKIN6 6ROUP Lic:en!iing Guide and Sample Lic:en!ie ·~ ICan.u City Plan I OFermilab ~OAK ~RIDGE Nuioul~.

386

Lessons learnt from ITER safety & licensing for DEMO and future nuclear fusion facilities  

E-Print Network (OSTI)

One of the strong motivations for pursuing the development of fusion energy is its potentially low environmental impact and very good safety performance. But this safety and environmental potential can only be fully realized by careful design choices. For DEMO and other fusion facilities that will require nuclear licensing, S&E objectives and criteria should be set at an early stage and taken into account when choosing basic design options and throughout the design process. Studies in recent decades of the safety of fusion power plant concepts give a useful basis on which to build the S&E approach and to assess the impact of design choices. The experience of licensing ITER is of particular value, even though there are some important differences between ITER and DEMO. The ITER project has developed a safety case, produced a preliminary safety report and had it examined by the French nuclear safety authorities, leading to the licence to construct the facility. The key technical issues that arose during ...

Taylor, Neill

2013-01-01T23:59:59.000Z

387

Challenges of Fusion Power Plant Licensing: Differences and Commonalities with Existing Systems  

SciTech Connect

At present, there are no regulatory guidelines to follow for US fusion power plant construction and operation. Thus far, the Department of Energy (DOE) has been regulating existing fusion experiments, following the 1996-1999 DOE Fusion Standards and using the spirit of the ASME (American Society of Mechanical Engineers) code. Considering this reality, a few options emerged for licensing ARIES-type power plants and the like. Developing new fusion-specific regulations stands out as the most logical option, but requires well-coordinated effort between DOE, regulatory agencies, and the fusion community with considerable funding and long lead-time. Nevertheless, a few recent developments seem promising: (1) The US Nuclear Regulatory Commission (NRC) plans to assert regulatory jurisdiction over commercial fusion devices, and (2) the ongoing effort within ASME will develop rules for the construction of fusion-energy-related components. The most recent NRC, ASME and fusion licensing developments are reviewed in this paper. In addition, an interesting comparison with ITER was made to foresee how US fusion power plants could leverage from ITER.

L. El-Guebaly; L. Cadwallader; W. Sowder

2011-08-01T23:59:59.000Z

388

Draft Surety Bond Rider Associated With Request for Transfer of Licenses Dear Ms. Haney: Purpose  

E-Print Network (OSTI)

The purpose of this letter is to request the U.S. Nuclear Regulatory Commission's (NRC) review and approval of a draft surety bond rider for the American Centrifuge Lead Cascade Facility. Background On December 30, 2010 (Reference 1), the NRC issued approval of the draft financial assurance instrument with one condition. Prior to the execution of the new surety bond, USEC Inc. (USEC) must submit for review a draft of the entire surety bond. This draft of the new surety bond must state the company that will underwrite the bond. The draft bond should also indicate the following on the line following the State of incorporation: "Surety's qualification in jurisdiction where licensed facility is located. " Also, on February 11, 2011 (Reference 2), the NRC issued Order EA- 11-013 in relation to USEC's request for written consent to transfer materials licenses from USEC to a subsidiary limited liability company (LLC), American Centrifuge Operating, LLC. Condition 1 states "USEC will obtain NRC approval on the revised financial assurance instruments for decommissioning of the Lead Cascade Facility." Discussion As stated within the Decommissioning Funding Plan, USEC presently intends to provide for funding through a surety bond. Enclosure 1 of this letter provides the draft surety bond rider which meets the conditions as specified within References 1 and 2. Action USEC respectfully requests that the NRC complete their review of the enclosed draft surety bond rider for the American Centrifuge Lead Cascade Facility by May 20, 2011.

Peter J

2011-01-01T23:59:59.000Z

389

NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning  

Science Conference Proceedings (OSTI)

The vision of the NEAMS program is to bring truly predictive modeling and simulation (M&S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

Bernholdt, David E [ORNL

2012-06-01T23:59:59.000Z

390

STATE OF CALIFORNIA NATURAL RESOURCES AGENCY EDMUND G. BROWN JR., Governor Examples of Energy Facility Licensing Schedules for  

E-Print Network (OSTI)

exempt thermal power plants from the certification process if the project is less than 100 megawatts Facility Licensing Schedules for 12-Month AFC Process and Small Power Plant Exemption (SPPE) 12-Month are requested to match the state schedule. . #12;Small Power Plant Exemption (SPPE) The Energy Commission may

391

AvAilAble for licensing Higher-performance, more cost-effective batteries for PHEVs and HEVs.  

E-Print Network (OSTI)

AvAilAble for licensing Higher-performance, more cost-effective batteries for PHEVs and HEVs. Benefits Higher-performance, more cost-effective batteries for PHEVs and HEVs. Reduced costs by lowering cost is easier, faster, and more cost-effective. Electrode Materials for Rechargeable Li-ion Batteries

Kemner, Ken

392

Nuclear Power Plant License Renewal Environmental Compliance Program: Donald C. Cook Nuclear Case Study, Phase 1--Preliminary Planni ng  

Science Conference Proceedings (OSTI)

This report describes preliminary environmental compliance planning activities that American Electric Power (AEP) is taking to preserve the option of renewing the Donald C. Cook Nuclear Plant license. The activities are based on a program plan manual published previously by EPRI. The report includes an evaluation of the usefulness of that manual.

1997-07-08T23:59:59.000Z

393

Licensed operating reactors: Status summary report data as of December 31, 1991. Volume 16  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1991) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1992-03-01T23:59:59.000Z

394

Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1995-04-01T23:59:59.000Z

395

Licensed operating reactors. Status summary report data as of December 31, 1993  

SciTech Connect

The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

Hartfield, R.A.

1994-03-01T23:59:59.000Z

396

Web-Based Training on Reviewing Dose Modeling Aspects of NRC Decommissioning and License Termination Plans  

SciTech Connect

NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course was developed in 2006 and 2007 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The objective of this course is to train NRC headquarters and regional office staff on how to review sections of a licensee's DP or LTP that pertain to dose modeling. The DP generally refers to the decommissioning of non-reactor facilities, while the LTP refers specifically to the decommissioning of reactors. This review is part of the NRC's licensing process, in which the NRC determines if a licensee has provided a suitable technical basis to support derived concentration guideline levels (DCGLs)1 or dose modeling analyses performed to demonstrate compliance with dose-based license termination rule criteria. This type of training is one component of an organizational management system. These systems 'use a range of practices to identify, create, represent, and distribute knowledge for reuse, awareness and learning'. This is especially important in an organization undergoing rapid change or staff turnover to retain organizational information and processes. NRC is committed to maintaining a dynamic program of training, development, and knowledge transfer to ensure that the NRC acquires and maintains the competencies needed to accomplish its mission. This paper discusses one specific project related to training, developing, and transferring knowledge to NRC staff on how to review dose-modeling portions of licensee-submitted DPs and LTPs. This project identified specific cases and examples, created easily updateable educational modules, represented material in an engaging format through animations, video, and graphics, and distributed information on how to perform these reviews in an accessible, web-based format. WBT promotes consistency in reviews and has the advantage of being able to be used as a resource to staff at any time. The WBT will provide reviewers with knowledge needed to perform risk-informed analyses (e.g., information related to development of realistic scenarios and use of probabilistic analysis). WBT on review of LTP or DP dose modeling will promote staff development, efficiency, and effectiveness in performing risk-informed, performance-based reviews of decommissioning activities at NRC-licensed facilities. One of the key advantages of this type of web-based training is that it can be loaded on-demand and can be reused indefinitely. In addition to the benefits of on-demand training, the modules can also be used for reference. The presentations are hosted on a web server that can be accessed by registered users at any time. Staff can return to a particular module to review the material long after they have completed the course.

LePoire, D.; Cheng, J.J.; Kamboj, S.; Arnish, J.; Richmond, P.; Chen, S.Y. [Argonne National Laboratory, 9700 S. Cass Ave., Argonne, IL 60439 (United States); Barr, C.; McKenney, C. [U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, MD 20852 (United States)

2008-01-15T23:59:59.000Z

397

This Traveler is the industrys Steam Generator Program Generic License Change  

E-Print Network (OSTI)

Package (GLCP) that we have been developing in coordination with the NRC staff for the past several years. The format of the documents in this submittal has been changed from the GLCP that the staff has reviewed previously in order to comply with standard technical specification convention, but the information contained therein is unchanged. The information in this Traveler is consistent with the Catawba license amendment request for steam generator technical specification changes that was submitted by the licensee on February 25, 2003. The two submittals need to remain consistent to ensure an unambiguous template for other licensees to follow when submitting related steam generator technical specification changes. We therefore request that your review of these two submittals proceed in parallel.

Anthony R. Pietrangelo; Dr. William; D. Beckner

2003-01-01T23:59:59.000Z

398

Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

Bloomquist, R.Gordon

1991-10-01T23:59:59.000Z

399

A Process for Reducing the Licensing Burden for New Products Containing Depleted Uranium  

NLE Websites -- All DOE Office Websites (Extended Search)

3-01 3-01 A Process for Reducing the Licensing Burden for New Products Containing Depleted Uranium Environmental Assessment Division Argonne National Laboratory Operated by The University of Chicago, under Contract W-31-109-Eng-38, for the United States Department of Energy Argonne National Laboratory, a U.S. Department of Energy Office of Science laboratory, is operated by The University of Chicago under contract W-31-109-Eng-38. DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor The University of Chicago, nor any of their employees or officers, makes any warranty, express or implied, or assumes

400

Threatened and endangered species evaluation for 75 licensed commercial nuclear power generating plants  

SciTech Connect

The Endangered Species Act (ESA) of 1973, as amended, and related implementing regulations of the jurisdictional federal agencies, the U.S. Departments of Commerce and Interior, at 50 CFR Part 17. 1, et seq., require that federal agencies ensure that any action authorized, funded, or carried out under their jurisdiction is not likely to jeopardize the continued existence of any threatened or endangered species or result in the destruction or adverse modification of critical habitats for such species. The issuance and maintenance of a federal license, such as a construction permit or operating license issued by the U.S. Nuclear Regulatory Commission (NRC) for a commercial nuclear power generating facility is a federal action under the jurisdiction of a federal agency, and is therefore subject to the provisions of the ESA. The U.S. Department of the Interior (through the Fish and Wildlife Service), and the U.S. Department of Commerce, share responsibility for administration of the ESA. The National Marine Fisheries Service (NMFS) deals with species that inhabit marine environments and anadromous fish, while the U.S. Fish and Wildlife Service (USFWS) is responsible for terrestrial and freshwater species and migratory birds. A species (or other distinct taxonomic unit such as subspecies, variety, and for vertebrates, distinct population units) may be classified for protection as `endangered` when it is in danger of extinction within the foreseeable future throughout all or a significant portion of its range. A `threatened` classification is provided to those animals and plants likely to become endangered within the foreseeable future throughout all or a significant portion of their ranges. As of February 1997, there were about 1067 species listed under the ESA in the United States. Additionally there were approximately 125 species currently proposed for listing as threatened or endangered, and another 183 species considered to be candidates for formal listing proposals.

Sackschewsky, M.R.

1997-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Application of American and French rules for the next Belgian PWR  

Science Conference Proceedings (OSTI)

The licensing practice in Belgium is evolving from the precedent compliance with the USNRC rules (as applied to the 4 last Belgian PWRs) to a more sophisticated approach applied to the next Belgian PWR (N8), which incorporates a mixed compliance with the USNRC or with French rules, depending on the equipment, the structure or the system considered. In this paper is presented the approach concerning the licensing rules applicable to N8. The following aspects are covered: rules applicable to the NSSS, rules applicable to the BOP (codes of design for systems and structures), rules applicable to the equipment (code of construction for mechanical and electrical components), and impact on the lay-out of the plant. Some examples of application of the methodology are given.

Roch, M.; Cavaco, A.

1988-01-01T23:59:59.000Z

402

Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Top U.S. Nuclear Official Commends Industry for Submitting 3rd Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC Top U.S. Nuclear Official Commends Industry for Submitting 3rd Combined Construction & Operating License Application to the NRC November 28, 2007 - 4:45pm Addthis RICHMOND, VA - The U.S. Department of Energy (DOE) Assistant Secretary for Nuclear Energy Dennis Spurgeon today commended Dominion North Anna, LLC (Dominion) for submission of a combined Construction and Operating License (COL) application to the Nuclear Regulatory Commission (NRC) for construction of a new nuclear power plant in the United States. Dominion's application seeks approval to build and operate one General Electric-Hitachi Economic Simplified Boiling Water Reactor (ESBWR) at its

403

Modular HTGR Safety Basis and Approach  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) capable of producing electricity and/or high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) process, as recommended in the NGNP Licensing Strategy - A Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy [DOE/NRC 2008]. Nuclear Regulatory Commission (NRC) licensing of the NGNP plant utilizing this process will demonstrate the efficacy for licensing future HTGRs for commercial industrial applications. This information paper is one in a series of submittals that address key generic issues of the priority licensing topics as part of the process for establishing HTGR regulatory requirements. This information paper provides a summary level introduction to HTGR history, public safety objectives, inherent and passive safety features, radionuclide release barriers, functional safety approach, and risk-informed safety approach. The information in this paper is intended to further the understanding of the modular HTGR safety approach with the NRC staff and public stakeholders. The NGNP project does not expect to receive comments on this information paper because other white papers are addressing key generic issues of the priority licensing topics in greater detail.

Thomas Hicks

2011-08-01T23:59:59.000Z

404

Community-research collaboration between researchers and acupuncturists: Integrating a participatory research approach in a statewide survey of licensed acupuncturists in California  

E-Print Network (OSTI)

Kelley J. A National Job Analysis: Acupuncture and OrientalAcupuncture Collaborative Study, a job analysis of licensedStudy (the LAC Study)a job analysis of a representative

Kuo, Tony; Christensen, Rebekah; Gelberg, Lillian; Rubenstein, Lisa; Burke, Adam

2006-01-01T23:59:59.000Z

405

Proposed License Amendments "Revised Pressure/Temperature (P/T) Curves, and  

E-Print Network (OSTI)

(FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 for Turkey Point Units 3 and 4 be amended to extend the heatup, cooldown, and inservice test limitations for the Reactor Coolant System (RCS). The present pressure/temperature (P/T) limits specified in Technical Specification (TS) 3/4.4.9, and in TS Figures 3.4-2, 3.4-3 and 3.4-4 apply for operation up to 19 Effective Full Power Years (EFPY). The proposed amendments will extend the service period for the new P/T limits to a maximum of 32 EFPY. The proposed amendments also revise TS 3.4.9.3, Cold Overpressure Mitigation System (COMS) setpoints. COMS is the Westinghouse version of Low Temperature Overpressure Protection (LTOP). The maximum permissible Power Operated Relief Valve (PORV) setpoint for low temperature operation of the RCS is being changed from 415 + 15 psig to < 561 psig, which includes instrument uncertainty of 70 psig, as a result of the P/T limit changes. The enable temperature for the

In Accordance Cfr; Florida Power; Light Company

2000-01-01T23:59:59.000Z

406

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation  

Science Conference Proceedings (OSTI)

This Manual represents Revision 5 of the user documentation for the modular code system referred to as SCALE. The history of the SCALE code system dates back to 1969 when the current Computational Physics and Engineering Division at Oak Ridge National Laboratory (ORNL) began providing the transportation package certification staff at the U.S. Atomic Energy Commission with computational support in the use of the new KENO code for performing criticality safety assessments with the statistical Monte Carlo method. From 1969 to 1976 the certification staff relied on the ORNL staff to assist them in the correct use of codes and data for criticality, shielding, and heat transfer analyses of transportation packages. However, the certification staff learned that, with only occasional use of the codes, it was difficult to become proficient in performing the calculations often needed for an independent safety review. Thus, shortly after the move of the certification staff to the U.S. Nuclear Regulatory Commission (NRC), the NRC staff proposed the development of an easy-to-use analysis system that provided the technical capabilities of the individual modules with which they were familiar. With this proposal, the concept of the Standardized Computer Analyses for Licensing Evaluation (SCALE) code system was born. This manual covers an array of modules written for the SCALE package, consisting of drivers, system libraries, cross section and materials properties libraries, input/output routines, storage modules, and help files.

NONE

1997-03-01T23:59:59.000Z

407

Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.  

Science Conference Proceedings (OSTI)

This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

Deshaye, Joyce; Bloomquist, R. Gordon

1992-12-01T23:59:59.000Z

408

Decommissioning License Termination Plan Documents and Lessons Learned: Summary of LTPs for Two Reactors and Nuclear Regulatory Comm ission Safety Evaluation Reports for Three Nuclear Power Plant LTPs  

Science Conference Proceedings (OSTI)

This report offers those utilities beginning the preparation of License Termination Plans (LTPs) in the near future a comprehensive summary of the approaches currently taken in LTP preparation by major nuclear decommissioning projects. The report details the approach taken in addressing each element of the LTP, and the lessons learned by those utilities currently undergoing the license termination process. This document provides needed guidance for the LTP process, and will greatly benefit utilities cons...

2004-04-28T23:59:59.000Z

409

AvAilAble for licensing Promising alternatives to graphite electrodes  

E-Print Network (OSTI)

lithium-ion batteries have become the battery of choice for everything from cell phones to electric cars and energy density Applications and Industries Transportation applications, such as electric and hybrid-electric

Kemner, Ken

410

Public comments on the proposed 10 CFR Part 51 rule for renewal of nuclear power plant operating licenses and supporting documents: Review of concerns and NRC staff response. Volume 1  

SciTech Connect

This report documents the Nuclear Regulatory Commission (NRC) staff review of public comments provided in response to the NRC`s proposed amendments to 10 Code of Federal Regulations (CFR) Part 51, which establish new requirements for the environmental review of applications for the renewal of operating licenses of nuclear power plants. The public comments include those submitted in writing, as well as those provided at public meetings that were held with other Federal agencies, State agencies, nuclear industry representatives, public interest groups, and the general public. This report also contains the NRC staff response to the various concerns raised, and highlights the changes made to the final rule and the supporting documents in response to these concerns.

NONE

1996-05-01T23:59:59.000Z

411

Quarterly Nuclear Deployment Scorecard - January 2014 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2014 January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 News Updates Luminant has requested a suspension of the NRC's review of its Comanche Peak Combined Construction and Operating License (COL) application. The company cited impacts to the review schedule of the Mitsubishi Heavy Industries US Advanced Pressurized Water Reactor (US-APWR) due to the vendor's desire to refocus its resources to reactor restarts in Japan as well as low electricity prices driven by low natural gas prices as reasons for the suspension. Unistar Nuclear Operating Co. has formally withdrawn its COL application from the Nuclear Regulatory Commission (NRC) to build and operate Areva's U.S. EPR at its Nine Mile Point site in Oswego, NY. In late 2009, Unistar requested a suspension of the application review due to

412

The Licensing Aspects of the Tritium Extraction Plant at the Chalk River Nuclear Laboratories  

Science Conference Proceedings (OSTI)

Fission Reactor / Proceedings of the Second National Topical Meeting on Tritium Technology in Fission, Fusion and Isotopic Applications (Dayton, Ohio, April 30 to May 2, 1985)

P.R. Ballantyne

413

AvAilAble for licensing Provides substantial improvement in heat transfer  

E-Print Network (OSTI)

towers and more Cooling of power and microelectronics Refrigeration and other cooling systems Nuclear for commercial and industrial heat-transfer applications. Benefits More efficient cooling systems Higher productivity Energy savings Applications and Industries Heat exchangers for engines, fuel cells, cooling

Kemner, Ken

414

OpenMP and its application on solving moving interface problem.  

E-Print Network (OSTI)

??x, 42 p. : ill. (some col.) ; 30 cm HKUST Call Number: Thesis MATH 2010 Ng In this work the performance of the OpenMP, (more)

Ng, Chi Kin

2010-01-01T23:59:59.000Z

415

AvAilAble for licensing Enhanced stability at a lower cost  

E-Print Network (OSTI)

applications, such as electric and hybrid-electric vehicles Portable electronic devices, such as cell phones that will increase the specific energy of advanced batteries while simultaneously providing enhanced stability

Kemner, Ken

416

QUARTERLY NUCLEAR POWER DEPLOYMENT SUMMARY JANUARY 2014  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Updates available at: www.energy.gov/ne NEXT UPDATE - April 2014 Page 1 News Updates  Luminant has requested a suspension of the NRC's review of its Comanche Peak Combined Construction and Operating License (COL) application. The company cited impacts to the review schedule of the Mitsubishi Heavy Industries US Advanced Pressurized Water Reactor (US- APWR) due to the vendor's desire to refocus its resources to reactor restarts in Japan as well as low electricity prices driven by low natural gas prices as reasons for the suspension.  Unistar Nuclear Operating Co. has formally withdrawn its COL application from the NRC to build and operate Areva's U.S. EPR at its Nine Mile

417

Quarterly Nuclear Deployment Scorecard - January 2014 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 Quarterly Nuclear Deployment Scorecard - January 2014 News Updates Luminant has requested a suspension of the NRC's review of its Comanche Peak Combined Construction and Operating License (COL) application. The company cited impacts to the review schedule of the Mitsubishi Heavy Industries US Advanced Pressurized Water Reactor (US-APWR) due to the vendor's desire to refocus its resources to reactor restarts in Japan as well as low electricity prices driven by low natural gas prices as reasons for the suspension. Unistar Nuclear Operating Co. has formally withdrawn its COL application from the Nuclear Regulatory Commission (NRC) to build and operate Areva's U.S. EPR at its Nine Mile Point site in Oswego, NY. In

418

Document Library | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 30, 2012 August 30, 2012 Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. August 30, 2012 Report on Modeling Coupled Processes in the Near Field of a Clay Repository Clay/shale has been considered as potential host rock for geological disposal of high-level radioactive waste throughout the world. Coupled

419

Resource Management Services: Water Regulation, Part 605: Applications for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5: 5: Applications for Diversion or Use of Water for Purposes Other Than Hydro-Electric Power Projects (New York) Resource Management Services: Water Regulation, Part 605: Applications for Diversion or Use of Water for Purposes Other Than Hydro-Electric Power Projects (New York) < Back Eligibility Agricultural Commercial Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Tribal Government Utility Savings Category Buying & Making Electricity Program Info State New York Program Type Siting and Permitting Provider NY Department of Environmental Conservation These rules apply to all applications for a license or a permit to take, divert, appropriate or otherwise use the waters of the State, except applications for hydro-electric power projects. Applications are reviewed

420

Glass Capacitor for High-Temperature Applications  

Fusion Energy Division Oak Ridge National Laboratory Licensing Contact Gregory C. Flickinger Technology Commercialization Manager, Energy and ...

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Author(s) 2007. This work is licensed under a Creative Commons License. Atmospheric Chemistry and Physics Global 2-D intercomparison of sectional and modal aerosol modules  

E-Print Network (OSTI)

Abstract. We present an intercomparison of several aerosol modules, sectional and modal, in a global 2-D model in order to differentiate their behavior for tropospheric and stratospheric applications. We model only binary sulfuric acidwater aerosols in this study. Three versions of the sectional model and three versions of the modal model are used to test the sensitivity of background aerosol mass and size distribution to the number of bins or modes and to the prescribed width of the largest mode. We find modest sensitivity to the number of bins (40 vs. 150) used in the sectional model. Aerosol mass is found to be reduced in a modal model if care is not taken in selecting the width of the largest lognormal mode, reflecting differences in sedimentation in the middle stratosphere. The size distributions calculated by the sectional model can be better matched by a modal model with four modes rather than three modes in most but not all situations. A simulation of aerosol decay following the 1991 eruption of Mt. Pinatubo shows that the representation of the size distribution can have a signficant impact on modelcalculated aerosol decay rates in the stratosphere. Between 1991 and 1995, aerosol extinction and surface area density calculated by two versions of the modal model adequately match results from the sectional model. Calculated effective radius for the same time period shows more intermodel variability, with a 20-bin sectional model performing much better than any of the modal models. 1

D. K. Weisenstein; J. E. Penner; M. Herzog; X. Liu

2007-01-01T23:59:59.000Z

422

Improved Martensitic Steel for High Temperature Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Improved Martensitic Steel Improved Martensitic Steel for High Temperature Applications Opportunity Research is active on the patented technology, titled "Heat-Treated 9 Cr-1 Mo Steel for High Temperature Application." This technology is available for licensing and/or further collaborative research from the U.S. Department of Energy's National Energy Technology Laboratory (NETL). Overview The operating efficiency of coal-fired power plants is directly related to combustion system temperature and pressure. Incorporation of ultra- supercritical (USC) steam conditions into new or existing power plants can achieve increased efficiency and reduce coal consumption, while reducing carbon dioxide emissions as well as other pollutants. Traditionally used materials do not possess the optimal characteristics for operation

423

AvAilAble for licensing A unique method for anode and cathode manufacture.  

E-Print Network (OSTI)

and portable device battery markets. Lithium-ion batteries offer significant advantages in weight and energy is developing advanced cell components that will enable new market applications for lithium-ion (Li-ion batteries. Battery Technology 20-cell 80-volt 8-kW Li-ion battery module designed by ANL for Hybrid Electric

Kemner, Ken

424

Bouncer: A Robust and Flexible License Management Service for Avoiding Illegal Use of Software  

E-Print Network (OSTI)

applications. Within a number of activities carried out on these phases, protection of intellectual property that have to be carried out in these often underestimated phases are: packaging, alpha and beta testing the paper, protection against illegal use of a software product is an issue that must be tackled on most

Cirne, Walfredo

425

Test Anxiety is a psychological condition experienced by a very small percentage of individuals. Test Anxiety should be confirmed by a licensed counselor.  

E-Print Network (OSTI)

·Test Anxiety is a psychological condition experienced by a very small percentage of individuals. Test Anxiety should be confirmed by a licensed counselor. ·Test Worry is the culmination of real or perceived pressure and expectations from yourself or others. Test Worry is often the result of varying

Lawrence, Rick L.

426

Nuclear Power 2010 Program Lessons Learned Report on the Combined Construction and Operating License/Design Certification Demonstration Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report August 30, 2012 Prepared by Longenecker and Associates DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

427

Radon-222 emissions and control practices for licensed uranium mills and their associated tailings piles. Final report  

SciTech Connect

The report is organized into five main sections. The conclusions of the effort are summarized in Chapter 2. A general description of current milling and tailings management practices and a summary of the site-specific characteristics of operating and standby uranium mills are contained in Chapter-3. The sources and emission rates of radon-222 at licensed mills and their associated tailings piles are contained in Chapter 4 along with the results of an effort to develop generic procedures to estimate radon-222 emissions for milling operations and tailings disposal. Control practices that are being or could be applied to the milling operation and tailings disposal areas and their estimated cost and effectiveness in reducing radon-222 emissions are presented in Chapter 5. The appendices contain detailed information on mill site data and emission estimates.

Not Available

1985-06-01T23:59:59.000Z

428

Attn: Document Control Desk Mr. Gary Janoskco, Chief Fuel Cycle Licensing Branch, NMSS U.S. Nuclear Regulatory Commission  

E-Print Network (OSTI)

Inc. (PRI) herein submits information concerning the completion of ground water restoration at the A-Wellfield. This information is intended to fulfill the requirements of License Condition 10.1.9.b that requires the submittal of a "Wellfield Completion Report " upon the completion of restoration of each wellfield. As detailed in the attached information, the A-Wellfield 20-Sand Production Zone was mined using the approved In Situ Leach (ISL) Mining Method from January 1988 until July 1991. The ISL mining method involved the addition of gaseous carbon dioxide and oxygen to the natural ground water contained within the 20-Sand Production Zone, the circulation of this solution (known as the lixiviant) through the ore to dissolve the uranium, and the capture of the dissolved uranium at the ion exchange (IX) facility located at Satellite No. 1. After mining was completed in the A-Wellfield, PRI completed ground water restoration from

Smith Ranch Highland

2004-01-01T23:59:59.000Z

429

Applications: n High performance computing  

E-Print Network (OSTI)

Division Licensable Technologies EnergyFitTM An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA www.lanl.gov/partnerships/license/technologies/ Summary: Energy use central databases. Hundreds of millions of dollars are wasted annu- ally due to power consump- tion

430

Executive Director for Operations STATUS OF EFFORTS TO FINALIZE REGULATIONS FOR RADIOLOGICAL CRITERIA FOR LICENSE TERMINATION:URANIUM RECOVERY FACILITIES  

E-Print Network (OSTI)

This paper provides information to the Commission and requests approval by negative consent of the staff's proposed alternative for proceeding with final rulemaking to amend criterion 6 of 10 CFR Part 40, Appendix A in order to provide radiological criteria for termination of uranium recovery licenses. SUMMARY: In a Staff Requirements Memorandum (SRM) on SECY-97-046A, dated May 21, 1997, the Commission instructed staff to develop a rule that addresses radiological criteria (decommissioning land and buildings) for license termination for uranium recovery facilities, i.e., uranium mills and in-situ leach facilities (ISLs), on an expedited basis. The staff has requested additional public comment on this issue, and is preparing a final rule for Commission approval. If the Commission approves the staff's recommended approach, the final rulemaking package will be forwarded to the Commission within 5 months after receiving approval. If the Commission selects an alternative approach, an additional opportunity for public comment may be necessary. A discussion of the alternatives considered is in Attachment 1. Attachment 2 is a differing viewpoint (as allowed under Office of Nuclear Material Safety and Safeguards Policy and Procedures Letter 1-8, Revision 4, December 1996) on the approach delineated in this Commission Paper, submitted by a staff member on April 8, 1998. A differing viewpoint is an allowed alternative to a Differing Professional View (DPV) or a Differing Professional Opinion (DPO). This alternative allows employees to document their differing professional views and attach these views to proposed staff positions or other documents, to be forwarded as the document moves through the management chain. Attachment 3 contains the dose modeling assumptions and results that support the staff's recommended approach. CONTACT:

L. Joseph Callan /s; Elaine Brummett Nmss/dwm

1998-01-01T23:59:59.000Z

431

Guide for licensing evaluations using CRAC2: A computer program for calculating reactor accident consequences  

Science Conference Proceedings (OSTI)

A version of the CRAC2 computer code applicable for use in analyses of consequences and risks of reactor accidents in case work for environmental statements has been implemented for use on the Nuclear Regulatory Commission Data General MV/8000 computer system. Input preparation is facilitated through the use of an interactive computer program which operates on an IBM personal computer. The resulting CRAC2 input deck is transmitted to the MV/8000 by using an error-free file transfer mechanism. To facilitate the use of CRAC2 at NRC, relevant background material on input requirements and model descriptions has been extracted from four reports - ''Calculations of Reactor Accident Consequences,'' Version 2, NUREG/CR-2326 (SAND81-1994) and ''CRAC2 Model Descriptions,'' NUREG/CR-2552 (SAND82-0342), ''CRAC Calculations for Accident Sections of Environmental Statements, '' NUREG/CR-2901 (SAND82-1693), and ''Sensitivity and Uncertainty Studies of the CRAC2 Computer Code,'' NUREG/CR-4038 (ORNL-6114). When this background information is combined with instructions on the input processor, this report provides a self-contained guide for preparing CRAC2 input data with a specific orientation toward applications on the MV/8000. 8 refs., 11 figs., 10 tabs.

White, J.E.; Roussin, R.W.; Gilpin, H.

1988-12-01T23:59:59.000Z

432

Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans.  

SciTech Connect

NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include: (1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and (2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting final status surveys are addressed in the WBT. Realistic case examples are presented and analyzed including the abstraction of a realistic site into a conceptual model and computer model. A case history is also used to demonstrate development of NRC review documents such as requests for additional information (RAIs). To enhance the web-based training experience, audio, animations, linked documents, quizzes, and scripts are being integrated with a commercial web-based training package that supports simple navigation. The course is also being integrated into both existing and state-of-the-art learning management systems. A testing group is being utilized to identify and help resolve training issues prior to deployment of the course. When completed, the course can be accessed for credited training with required modules dependent on the job category of the training participant. The modules will also be accessible to NRC staff for review or refresher following initial course completion. WBT promotes consistency in reviews and has the advantage of being able to be used as a resource to staff at any time. The WBT provides reviewers with knowledge needed to perform risk-informed analyses (e.g., information related to development of realistic scenarios and use of probabilistic analysis). WBT on review of LTP or DP dose modeling promotes staff development, efficiency, and effectiveness in performing risk-informed, performance-based reviews of decommissioning activities at NRC-licensed facilities.

LePoire, D.; Arnish, J.; Cheng, J. J.; Kamboj, S.; Richmond, P.; Chen, S. Y.; Barr, C.; McKenney, C.; Environmental Science Division; NRC

2007-01-01T23:59:59.000Z

433

Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans  

SciTech Connect

NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include 1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and 2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting final status surveys are addressed in the WBT. Realistic case examples are presented and analyzed including the abstraction of a realistic site into a conceptual model and computer model. A case history is also used to demonstrate development of NRC review documents such as requests for additional information (RAIs). To enhance the web-based training experience, audio, animations, linked documents, quizzes, and scripts are being integrated with a commercial web-based training package that supports simple navigation. The course is also being integrated into both existing and state-of-the-art learning management systems. A testing group is being utilized to identify and help resolve training issues prior to deployment of the course. When completed, the course can be accessed for credited training with required modules dependent on the job category of the training participant. The modules will also be accessible to NRC staff for review or refresher following initial course completion. WBT promotes consistency in reviews and has the advantage of being able to be used as a resource to staff at any time. The WBT will provide reviewers with knowledge needed to perform risk-informed analyses (e.g., information related to development of realistic scenarios and use of probabilistic analysis). WBT on review of LTP or DP dose modeling will promote staff development, efficiency, and effectiveness in performing risk-informed, performance-based reviews of decommissioning activities at NRC-licensed facilities. (authors)

LePoire, D.; Arnish, J.; Cheng, J.J.; Kamboj, S.; Richmond, P.; Chen, S.Y. [Argonne National Laboratory, Argonne, IL (United States); Barr, C.; McKenney, C. [U.S. Nuclear Regulatory Commission, Rockville, MD (United States)

2007-07-01T23:59:59.000Z

434

Evaluation of Thermal Fatigue Effects on Systems Requiring Aging Management Review for License Renewal for the Calvert Cliffs Nuclear Power Plant  

Science Conference Proceedings (OSTI)

In recent years, the nuclear power industry has devoted significant attention to metal fatigue and its impact on the design qualification and serviceability of operating components. This study provides a pilot plant demonstration of the current industry technical position on fatigue evaluation for license renewal, specifically addressing reactor water environmental effects. It also develops a technical evaluation method for determining fatigue life adequacy in a feedwater piping system, a pressurizer sur...

1998-02-25T23:59:59.000Z

435

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation. Miscellaneous -- Volume 3, Revision 4  

Science Conference Proceedings (OSTI)

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice; (2) automate the data processing and coupling between modules, and (3) provide accurate and reliable results. System developments has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.2 of the system. This manual is divided into three volumes: Volume 1--for the control module documentation, Volume 2--for the functional module documentation, and Volume 3--for the data libraries and subroutine libraries.

Petrie, L.M.; Jordon, W.C. [Oak Ridge National Lab., TN (United States); Edwards, A.L. [Oak Ridge National Lab., TN (United States)]|[Lawrence Livermore National Lab., CA (United States)] [and others

1995-04-01T23:59:59.000Z

436

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation. Control modules -- Volume 1, Revision 4  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automate the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.2 of the system. This manual is divided into three volumes: Volume 1--for the control module documentation, Volume 2--for the functional module documentation, and Volume 3 for the documentation of the data libraries and subroutine libraries.

Landers, N.F.; Petrie, L.M.; Knight, J.R. [Oak Ridge National Lab., TN (United States)] [and others

1995-04-01T23:59:59.000Z

437

Disclosure and licensing of university inventions: the best we can do with the s**t we get to work with  

E-Print Network (OSTI)

We examine the interplay of the three major university actors in technology transfer from universities to industry: the faculty, the technology transfer oce (TTO), and the central administration. We model the faculty as an agent of the administration, and the TTO as an agent of both the faculty and the administration. Empirical tests of the theory are based on evidence from our survey of 62 US research universities. We nd that the TTOs reported licensing objectives are inuenced by their views of faculty and administration, which supports the assumption that the TTO is a dual agent. The theory yields predictions for whether or not faculty disclose inventions and if so, at what stage, which in turn aects license contract terms. We also examine how the portion of inventions disclosed at dierent stages varies with faculty quality. Quality is found to be inversely related to the share of license income allotted to faculty. We thank John Scott, two anonymous referees, and participants of the Workshop

Richard A. Jensen; Jerry G. Thursby; Marie C. Thursby

2003-01-01T23:59:59.000Z

438

HTS applications  

E-Print Network (OSTI)

Superconductivity has found many attractive applications in medicine, science, power systems, engineering, transport and electronics. One of the most prominent applications of superconductivity are superconducting magnets e.g. MRI magnets, NMR magnets, accelerator magnets, and magnets for fusion; most applications still use low temperature superconductors. Since the discovery of high temperature superconductivity (HTS) in 1986 there has been a tremendous progress in R&D of HTS material, wires and applications. Especially for power system applications, HTS offers considerable economic benefits. Many HTS demonstrator or prototype applications have been built and successfully tested, and some HTS applications like cables and superconducting fault current limiters seem very close to commercialisation. This paper gives an overview about the present and future HTS applications in power applications, high field magnets and current leads. In addition results of the Forschungszentrum Karlsruhe program to develop H...

Noe, M; Fietz, W H; Goldacker, W; Schneider, Th

2009-01-01T23:59:59.000Z

439

PDF Application  

Science Conference Proceedings (OSTI)

?Computer Applications and Process Control. ?Copper Nickel and Cobalt ... ? Iron and Steel. ?Joining. ?Lead Zinc and Tin. ?Lightweight Materials.

440

Technical Data to Justify Full Burnup Credit in Criticality Safety Licensing Analysis  

Science Conference Proceedings (OSTI)

Enercon Services, Inc. (ENERCON) was requested under Task Order No.2 to identify scientific and technical data needed to benchmark and justify Full Burnup Credit, which adds 16 fission products and 4 minor actinides1 to Actinide-Only burnup credit. The historical perspective for Full Burnup Credit is discussed, and interviews of organizations participating in burnup credit activities are summarized as a basis for identifying additional data needs and making recommendation. Input from burnup credit participants representing two segments of the commercial nuclear industry is provided. First, the Electric Power Research Institute (EPRI) has been very active in the development of Full Burnup Credit, representing the interests of nuclear utilities in achieving capacity gains for storage and transport casks. EPRI and its utility customers are interested in a swift resolution of the validation issues that are delaying the implementation of Full Burnup Credit [EPRI 2010b]. Second, used nuclear fuel storage and transportation Cask Vendors favor improving burnup credit beyond Actinide-Only burnup credit, although their discussion of specific burnup credit achievements and data needs was limited citing business sensitive and technical proprietary concerns. While Cask Vendor proprietary items are not specifically identified in this report, the needs of all nuclear industry participants are reflected in the conclusions and recommendations of this report. In addition, Oak Ridge National Laboratory (ORNL) and Sandia National Laboratory (SNL) were interviewed for their input into additional data needs to achieve Full Burnup Credit. ORNL was very open to discussions of Full Burnup Credit, with several telecoms and a visit by ENERCON to ORNL. For many years, ORNL has provided extensive support to the NRC regarding burnup credit in all of its forms. Discussions with ORNL focused on potential resolutions to the validation issues for the use of fission products. SNL was helpful in ENERCON's understanding of the difficult issues related to obtaining and analyzing additional cross section test data to support Full Burnup Credit. A PIRT (Phenomena Identification and Ranking Table) analysis was performed by ENERCON to evaluate the costs and benefits of acquiring different types of nuclear data in support of Full Burnup Credit. A PIRT exercise is a formal expert elicitation process with the final output being the ranking tables. The PIRT analysis (Table 7-4: Results of PIRT Evaluation) showed that the acquisition of additional Actinide-Only experimental data, although beneficial, was associated with high cost and is not necessarily needed. The conclusion was that the existing Radiochemical Assay (RCA) data plus the French Haut Taux de Combustion (HTC)2 and handbook Laboratory Critical Experiment (LCE) data provide adequate benchmark validation for Actinide-Only Burnup Credit. The PIRT analysis indicated that the costs and schedule to obtain sufficient additional experimental data to support the addition of 16 fission products to Actinide-Only Burnup Credit to produce Full Burnup Credit are quite substantial. ENERCON estimates the cost to be $50M to $100M with a schedule of five or more years. The PIRT analysis highlights another option for fission product burnup credit, which is the application of computer-based uncertainty analyses (S/U - Sensitivity/Uncertainty methodologies), confirmed by the limited experimental data that is already available. S/U analyses essentially transform cross section uncertainty information contained in the cross section libraries into a reactivity bias and uncertainty. Recent work by ORNL and EPRI has shown that a methodology to support Full Burnup Credit is possible using a combination of traditional RCA and LCE validation plus S/U validation for fission product isotopics and cross sections. Further, the most recent cross section data (ENDF/B-VII) can be incorporated into the burnup credit codes at a reasonable cost compared to the acquisition of equivalent experimental data. ENERCON concludes that even with the cos

Enercon Services, Inc.

2011-03-14T23:59:59.000Z

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Sizing Sun Ray Servers Running Windows Applications  

E-Print Network (OSTI)

This product or document is protected by copyright and distributed under licenses restricting its use, copying, distribution, and decompilation. No part of this product or document may be reproduced in any form by any means without prior written authorization of Sun and its licensors, if any. Third-party software, including font technology, is copyrighted and licensed from Sun suppliers. Parts of the product may be derived from Berkeley BSD systems, licensed from the University of California. UNIX is a registered trademark in the U.S. and other countries, exclusively licensed through X/Open Company, Ltd.

Sunpci Iipro

2001-01-01T23:59:59.000Z

442

Multi-service briefing on radioisotope systems for defense applications, briefing notes and supporting information  

SciTech Connect

A briefing on isotope systems technology and applications was held at the Pentagon on 9 May 1990, cosponsored by the Department of Defense and the Department of Energy. The objective was to provide isotope systems information to interested individuals and offices from the DOD and the Services, and then to discuss potential uses of this technology within the defense community. Presentations were given on the useful characteristics of radioactive decay, isotope sources, properties of specific isotopes, and details of isotope systems that have been deployed for terrestrial and space applications. Application areas covered included: electrical, thermal and mechanical energy conversion systems; radiation applications; and radioluminescent lights. Talks were also given on system licensing and approvals, and conclusions from the 1986 workshop on isotope systems applications. This document contains the meeting agenda, copies of the vu-graphs used in the presentations, face sheets given to meeting attendees, a list of attendees, and supplementary information requested during the meeting.

Jarrett, J.H.; Tingey, G.L.

1990-05-01T23:59:59.000Z

443

A double-hexameric MCM2-7 complex is loaded onto origin DNA during licensing of eukaryotic DNA replication  

Science Conference Proceedings (OSTI)

During pre-replication complex (pre-RC) formation, origin recognition complex (ORC), Cdc6, and Cdt1 cooperatively load the 6-subunit mini chromosome maintenance (MCM2-7) complex onto DNA. Loading of MCM2-7 is a prerequisite for DNA licensing that restricts DNA replication to once per cell cycle. During S phase MCM2-7 functions as part of the replicative helicase but within the pre-RC MCM2-7 is inactive. The organization of replicative DNA helicases before and after loading onto DNA has been studied in bacteria and viruses but not eukaryotes and is of major importance for understanding the MCM2-7 loading mechanism and replisome assembly. Lack of an efficient reconstituted pre-RC system has hindered the detailed mechanistic and structural analysis of MCM2-7 loading for a long time. We have reconstituted Saccharomyces cerevisiae pre-RC formation with purified proteins and showed efficient loading of MCM2-7 onto origin DNA in vitro. MCM2-7 loading was found to be dependent on the presence of all pre-RC proteins, origin DNA, and ATP hydrolysis. The quaternary structure of MCM2-7 changes during pre-RC formation: MCM2-7 before loading is a single hexamer in solution but is transformed into a double-hexamer during pre-RC formation. Using electron microscopy (EM), we observed that loaded MCM2-7 encircles DNA. The loaded MCM2-7 complex can slide on DNA, and sliding is not directional. Our results provide key insights into mechanisms of pre-RC formation and have important implications for understanding the role of the MCM2-7 in establishment of bidirectional replication forks.

Evrin, C.; Li, H.; Clarke, P.; Zech, J.; Lurz, R.; Sun, J.; Uhle, S.; Stillman, B.; Speck, C.

2009-12-01T23:59:59.000Z

444

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation: Functional modules F1-F8  

SciTech Connect

This Manual represents Revision 5 of the user documentation for the modular code system referred to as SCALE. The history of the SCALE code system dates back to 1969 when the current Computational Physics and Engineering Division at Oak Ridge National Laboratory (ORNL) began providing the transportation package certification staff at the U.S. Atomic Energy Commission with computational support in the use of the new KENO code for performing criticality safety assessments with the statistical Monte Carlo method. From 1969 to 1976 the certification staff relied on the ORNL staff to assist them in the correct use of codes and data for criticality, shielding, and heat transfer analyses of transportation packages. However, the certification staff learned that, with only occasional use of the codes, it was difficult to become proficient in performing the calculations often needed for an independent safety review. Thus, shortly after the move of the certification staff to the U.S. Nuclear Regulatory Commission (NRC), the NRC staff proposed the development of an easy-to-use analysis system that provided the technical capabilities of the individual modules with which they were familiar. With this proposal, the concept of the Standardized Computer Analyses for Licensing Evaluation (SCALE) code system was born. This volume consists of the section of the manual dealing with eight of the functional modules in the code. Those are: BONAMI - resonance self-shielding by the Bondarenko method; NITAWL-II - SCALE system module for performing resonance shielding and working library production; XSDRNPM - a one-dimensional discrete-ordinates code for transport analysis; XSDOSE - a module for calculating fluxes and dose rates at points outside a shield; KENO IV/S - an improved monte carlo criticality program; COUPLE; ORIGEN-S - SCALE system module to calculate fuel depletion, actinide transmutation, fission product buildup and decay, and associated radiation source terms; ICE.

NONE

1997-03-01T23:59:59.000Z

445

2010 Medicine Reports Ltd Clinical applications of breath testing  

E-Print Network (OSTI)

This is an open-access article distributed under the terms of the Creative Commons Attribution-NonCommercial License

Kelly M Paschke; Alquam Mashir; Raed A Dweik

2010-01-01T23:59:59.000Z

446

Total System Performance Assessment-License Application Design Selection (LADS) Phase 1 Analysis of Surface Modification Consisting of Addition of Alluvium (Feature 23a)  

Science Conference Proceedings (OSTI)

The objective of this report is to document the analysis that was conducted to evaluate the effect of a potential change to the TSPA-VA base case design that could improve long-term repository performance. The design feature evaluated in this report is a modification of the topographic surface of Yucca Mountain. The modification consists of covering the land surface immediately above the repository foot-print with a thick layer of unconsolidated material utilizing rip-rap and plants to mitigate erosion. This surface modification is designated as Feature 23a or simply abbreviated as F23a. The fundamental aim of F23a is to reduce the net infiltration into the unsaturated zone by enhancing the potential for evapotranspiratiration at the surface; such a change would, in turn, reduce the seepage flux and the rate of radionuclide releases from the repository. Field and modeling studies of water movement in the unsaturated zone have indicated that shallow infiltration at the surface is almost negligible in locations where the bedrock is covered by a sufficiently thick soil layer. In addition to providing storage for meteoric water, a thick soil layer would slow the downward movement of soil moisture to such an extent that evaporation and transpiration could easily transfer most of the soil-water back to the atmosphere. Generic requirements for the effectiveness of this design feature are two-fold. First, the soil layer above the repository foot-print must be thick enough to provide sufficient storage of meteoric water (from episodic precipitation events) and accommodate plant roots. Second, the added soil layer must be engineered so as to mitigate thinning by erosional processes and have sufficient thickness to accommodate the roots of common desert plants. Under these two conditions, it is reasonable to expect that modification would be effective for a significant time period and the net infiltration and deep percolation flux would be reduced by orders of magnitude lower than the present levels. Conceptually, the topographic surface above the repository foot-print would be re-contoured to make it more suitable for placement of unconsolidated materials (e.g., alluvium). Figure 1 shows the region of the surface modification in relation to the location of the repository foot-print. The surface contours in this region after modification are shown in the plot presented in Figure 2. Basically, the surface modification would be accomplished by applying cuts to the ridges slopes on the east flank of Yucca Mountain to produce a relatively uniform slope of about 10%. The alluvium would be covered with rock fragments (to imitate the desert pavement) to reduce erosion. This report documents the modeling assumptions and performance analysis conducted to estimate the long-term performance for Feature 23a. The performance measure for this evaluation is dose-rate. Results are presented that compare the dose-rate time histories for the new design feature to those of the TSPA-VA base case calculation (CRWMS M&O 1998a).

N. Erb

1999-06-11T23:59:59.000Z

447

PETSc: Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Applications and Publications Applications and Publications Home Download Features Documentation Applications/Publications Prizes Industrial/DOE sites DOE CSGF users Miscellaneous External Software Developers Site These are publications on application simulations developed by PETSc users. Please send us information about your publications, petsc-maint@mcs.anl.gov. How to cite PETSc in your publications. See Acknowledgments for software packages that PETSc uses. PETSc has been used for modeling in all of these areas: Acoustics, Aerodynamics, Air Pollution, Arterial Flow, Bone Fractures, Brain Surgery, Cancer Surgery, Cancer Treatment, Carbon Sequestration, Cardiology, Cells, CFD, Combustion, Concrete, Corrosion, Data Mining, Dentistry, Earth Quakes, Economics, Fission, Fusion, Glaciers, Ground Water Flow, Linguistics,

448

Application: Electronics  

Science Conference Proceedings (OSTI)

Application: Electronics. ... Suppression of Electrical Cable Fires: Development of a Standard PVC Cable Fire Test for ISO 14520-1.. Robin, ML ...

2011-12-22T23:59:59.000Z

449

Application Form  

Science Conference Proceedings (OSTI)

ELIGIBILITY REQUIREMENTS. The application ... Note: Applying for the travel award does not enter your abstract into the TMS Conference Management System.

450

brochure application  

Science Conference Proceedings (OSTI)

Magnetohydrodynamics. 19. Measurement Techniques for Pot Analysis ... Country ... Be sure to note your personal topics of interest on the application because...

451

06-GA50035c_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Coal, 50% Coal, 50% Nuclear, 20% Natural Gas, 17% Hydro, 7% Oil, 3% Other Industrial, 1% wood, wind, solar, 2% Landfill gas, geothermal, G NEP will build on the recent advances made by the President and Congress to stimulate new nuclear plant construction in the U.S. This will be accomplished by demonstrating the success of the streamlined regulations for siting, constructing and operating new nuclear plants through the Nuclear Power 2010 program, and by implementing incentives enacted through the Energy Policy Act of 2005 (EPACT 2005). At 20 percent of the total electricity supply in the nation, nuclear power is the second largest source of domestic electricity, while seventy percent comes from fossil burning fuels GNEP Element: Expand Domestic Use of Nuclear Power (coal, natural gas, and oil). Increasing the

452

Building Energy Software Tools Directory: RadOnCol  

NLE Websites -- All DOE Office Websites (Extended Search)

project involving flat plate collectors. Might also be of interest to solar engineers, solar installers. Input Local Latitude, altitude, and azimuth and tilt of collector....

453

06-GA50035f_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that would otherwise be waste. GNEP Element: Develop Advanced Burner Reactors A concept diagram for an Advanced Burner Test Reactor Continued next page How the system would work...

454

06-GA50035g_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

fuel, could be used to produce material for a nuclear weapon. For example, highly enriched uranium can be created by enriching uranium beyond the level required for nuclear...

455

06-GA50035i_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

G G NEP will help prevent misuse of civilian nuclear facilities for non- peaceful purposes by developing enhanced safeguards programs and technologies. International nuclear safeguards are integral to implementing the GNEP vision of a peaceful expansion of nuclear energy and demonstration of more proliferation-resistant fuel cycle technologies. What are safeguards? Safeguards are the basic building blocks of international nonproliferation programs - GNEP Element: Develop Enhanced Nuclear Safeguards Continued next page accounting for nuclear materials, control of technology, transparency in the use of technology and materials to validate peaceful uses, and the ability to inspect and verify compliance with international agreements and obligations. International safeguards

456

06-GA50035g_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GNEP Element: GNEP Element: Establish Reliable Fuel Services A possible reliable fuel services arrangement G NEP would build and strengthen a reliable international fuel services consortium under which "fuel supplier nations" would choose to operate both nuclear power plants and fuel production and handling facilities, providing reliable fuel services to "user nations" that choose to only operate nuclear power plants. This international consortium is a critical component of the GNEP initiative to build an improved, more proliferation-resistant nuclear fuel cycle that recycles used fuel, while increasing energy security for all participating nations. Reliable supply reduces the incentive to spread uranium enrichment or reprocessing technology The challenge stems from the fact that

457

XRY*?***rx??c* I? **#**COL }?~? (SEC?&' DATc ...  

Science Conference Proceedings (OSTI)

... jIlTWs??f_????f? ?>Epw*?????~?B?*?)?o6D?*?*C\\??? V***??*#?6*?0???^?MGV[?D*Q\\W??_ <+%????. ...

2012-10-24T23:59:59.000Z

458

06-GA50035e_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

products inhibits the nuclear fission reaction, so used fuel must be removed from a nuclear power plant. To consume transuranic elements and uranium, while recovering their...

459

Empreses i entitats amb conveni de col.laboraci  

E-Print Network (OSTI)

, according to Afghan officials and residents. Last week, the head of the U.N. Afghanistan office, Jan Kubic

Politècnica de Catalunya, Universitat

460

06-GA50035f_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

their energy. The development of ABRs will allow us to build an improved nuclear fuel cycle that recycles used fuel. Accordingly, the U.S. will work with participating...

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

06-GA50035i_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

peaceful expansion of nuclear energy and demonstration of more proliferation-resistant fuel cycle technologies. What are safeguards? Safeguards are the basic building blocks of...

462

06-GA50035d_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

be consumed, not disposed of as waste. (See Advanced Burner Reactors.) Residual waste fission products would be reconfigured for disposal at a single geologic repository. February...

463

06-GA50035h_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

reactors suitable for emerging economies that currently depend on oil and other fossil fuels for growing energy demands. Addressing this market is essential to safely...

464

Building Energy Software Tools Directory: RadOnCol  

NLE Websites -- All DOE Office Websites (Extended Search)

Tools by Country Australia Austria Belarus Belgium Brazil Canada Chile China Czech Republic Denmark Finland France Germany India Ireland Israel Italy Japan Netherlands New Zealand...

465

06-GA50035c_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

second largest source of domestic electricity, while seventy percent comes from fossil burning fuels GNEP Element: Expand Domestic Use of Nuclear Power (coal, natural gas, and...

466

06-GA50035e_2-col.p65  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U nder GNEP, the U.S. will work with GNEP partners to demonstrate the capability to safely recycle used nuclear fuel using more proliferation- resistant separation processes. In support of this effort, the U.S and its international partners would conduct an Engineering- Scale Demonstration (ESD) of a process that would separate the usable components in used commercial fuel from its waste components, without separating pure plutonium. An Advanced Fuel Cycle Facility (AFCF) would be a multi-purpose research and development laboratory that can serve fuel cycle testing needs for 50 years or more. Fuel recycle separates used fuel Used nuclear fuel contains uranium, transuranics elements (plutonium and other long-lived radioactive material), and fission products. The fission products are waste

467

Building Energy Software Tools Directory: RadOnCol  

NLE Websites -- All DOE Office Websites (Extended Search)

program gives energy collected for FULL SUN conditions -- it does not account for cloudy weather, and should not be used to estimate how much energy you will actually collect in...

468

Reference: Additional Plant Systems Information Supporting the License Amendment Request to Permit Uprated Power Operation, Dresden Nuclear Power Station and Quad Cities Nuclear Power Station  

E-Print Network (OSTI)

2000 In the referenced letter, Commonwealth Edison Company, now Exelon Generation Company (EGC), LLC, submitted a request for changes to the operating licenses and Technical Specifications (TS) for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2, to allow operation at uprated power levels. In a telephone conference on August 31, 2001, between representatives of EGC and Mr. L. W. Rossbach and other members of the NRC, the NRC requested additional information regarding these proposed changes. The attachment to this letter provides the requested information. Should you have any questions related to this letter, please contact Mr. Allan R. Haeger

K. A. Ainger

2001-01-01T23:59:59.000Z

469

Using the Conceptual Site Model to Remediate Two Sites in New England and Reach License Termination and Site Reuse  

SciTech Connect

The Conceptual Site Model (CSM) is a powerful tool for understanding the link between contamination sources, cleanup objectives, and ultimate site reuse. The CSM describes the site setting, geology, hydrogeology, potential sources, release mechanisms and migration pathways of contaminants. The CSM is needed to understand the extent of contamination and how receptors may be exposed to both radiological and chemical constituents. A key component of the CSM that is often overlooked concerns how the regulatory requirements drive remediation and how each has to be integrated into the CSM to ensure that all stakeholder requirements are understood and addressed. This paper describes how the use of the CSM helped reach closure and reuse at two facilities in Connecticut that are pursuing termination of their Nuclear Regulatory Commission (NRC) license. The two facilities are the Combustion Engineering Site, located in Windsor, Connecticut, (CE Windsor Site) and the Connecticut Yankee Atomic Power Company, located in Haddam Neck, Connecticut (CYAPCO). The closure of each of these facilities is regulated by four agencies: - Nuclear Regulatory Commission (NRC) - which requires cleanup levels for radionuclides to be protective of public health; - US Environmental Protection Agency (USEPA) - which requires cleanup levels for chemicals to be protective of public health and the environment; - Connecticut Department of Environmental Protection (CTDEP) Bureau of Air Management, Radiation Division - which requires cleanup levels for radionuclides to be protective of public health; and - Connecticut Department of Environmental Protection (CTDEP) Bureau of Water Protection and Land Reuse - which requires cleanup levels for chemicals to be protective of public health and the environment. Some of the radionuclides at the CE Windsor Site are also regulated under the Formerly Utilized Site Remedial Action Program (FUSRAP) under the Army Corps of Engineers. The remainder of this paper presents the similarities and differences between the CSMs for these two sites and how each site used the CSM to reach closure. Although each of these site have unique histories and physical features, the CSM approach was used to understand the geology, hydrogeology, migration and exposure pathways, and regulatory requirements to successfully characterize and plan closure of the sites. A summary of how these attributes affected site closure is provided.

Glucksberg, Nadia; Peters, Jay [MACTEC Engineering and Consulting, Inc., Portland, Maine, 04112 and Wakefield, Massachusetts, 01880 (United States)

2008-01-15T23:59:59.000Z

470

License Iso. CM35  

Office of Legacy Management (LM)

Alolan&le, vlrghla Attoatlonl w. & 0. EutahlDon Pursuant to the Atanic Energy Act of 1954 and Section 40.21 or the Code of Federal Regulations, Title 10 - Atomic Energy, Chapter...

471

BP License - FT Technology  

Science Conference Proceedings (OSTI)

... 1600 1800 2000 Illinois Basin Coal Qatar LNG Alaska Natural Gas Wyoming Natural Gas Kentucky SNG with geologic storage lb s C O 2e / M W h ...

2012-05-18T23:59:59.000Z

472

License GPL-2  

E-Print Network (OSTI)

Description Data from statistical agencies and other institutions are mostly confidential. This package can be used for the generation of save (micro)data, i.e. for the generation of public- and scientific-use files.

Matthias Templ; Maintainer Matthias Templ

2009-01-01T23:59:59.000Z

473

Argus Primar Software License  

and expenses arise or are alleged to arise, directly or indirectly, from the participation, whether active or passive, or negligence, whether ordinary or gross, ...

474

Radioactive Materials License Commitments  

E-Print Network (OSTI)

Personnel Dosimeters Used at Nuclear Power Reactors," NUREG/CR-1204, U.S. Nuclear Regulatory Commission

475

LANL | TT | License | Software  

NLE Websites -- All DOE Office Websites (Extended Search)

| toolbar | links | content Los Alamos National Laboratory Lab Home | Phone ABOUT LANL ContactsEvent CalendarMapsOrganizationPhonebookPolicy CenterEmergency NEWS LIBRARY JOBS...

476

LANL | TT | Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

| toolbar | links | content Los Alamos National Laboratory Lab Home | Phone ABOUT LANL ContactsEvent CalendarMapsOrganizationPhonebookPolicy CenterEmergency NEWS LIBRARY JOBS...

477

Argonne Software Licensing: Autonomie  

AUTONOMIE OVERVIEW Background. Building hardware is expensive. Traditional design paradigms in the automotive industry often delay control system ...

478

BNL | Image Licensing Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

shall not be modified or digitally manipulated in any way other than to adjust size, crop, or color attributes in order to optimize it for print production. The credit line...

479

Argonne Software Licensing: SMART  

SMART. MC 2-3. MC 2-3 generates ... purpose of the code is to generate region-dependent broad-group cross sections for the whole core in a ...

480

Argonne Software Licensing: GCTool  

Access Grid Toolkit EPICS Globus Toolkit GREET MPICH PUMA2 ... Scavenger SEED VISION. OTHER Math & Computing Science ...

Note: This page contains sample records for the topic "license col applications" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Argonne Software Licensing: SMART  

SMART. SMART (Simple Model for ALD Reaction and Transport) is a software developed by the Atomic Layer Deposition group at Argonne National ...

482

Argonne Software Licensing: ADIFOR  

Access Grid Toolkit EPICS Globus Toolkit GREET MPICH PUMA2 ... Scavenger SEED VISION. OTHER Math & Computing Science ...

483

Process Applications  

Science Conference Proceedings (OSTI)

...flash-welding applications include: Chain links Transmission bands Automotive flywheel ring gears Strips that are joined for continuous processing lines Wire and bar drawing operations for continuous stamping press

484

Superabrasive Applications  

Science Conference Proceedings (OSTI)

Table 2   Typical applications of superabrasives...airports, highways Mining products Stone, shale, rock Drilling Precision grinding wheels Carbide Tool production and resharpening; wear parts and

485

Industrial Applications  

Science Conference Proceedings (OSTI)

Table 2   Frequently used rubber linings in other industries...Application Lining Power industry Scrubber towers Blended chlorobutyl Limestone slurry tanks Blended chlorobutyl Slurry piping Blended chlorobutyl 60 Shore A hardness natural rubber Seawater cooling water

486

APPLICATION OF A CATEGORICAL EXCLUSION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Granting of a real estate license by the Department of Energy to Duke Energy for the purpose Granting of a real estate license by the Department of Energy to Duke Energy for the purpose of conducting site environmental evaluation activities on the north portion of the Portsmouth Gaseous Diffusion Facility to determine environmental conditions and determine if further study is warranted. Evaluation activities will consist of, but are not limited to, soil and rock sampling, geotechnical surveys, ecological surveys, and rare, threatened and endangered species evaluations. Number and Title of the Categorical Exclusion Applied: 10 CFR 1021, Appendix B to Subpart D, CX. A.1 for the granting of the real estate license and B.3.1 for activities to determine environmental conditions.. The regulatory requirements from 10 CFR Part 1021, Subpart D,

487

NERSC Applications Software  

NLE Websites -- All DOE Office Websites (Extended Search)

For Users Software Applications Applications List of Applications List of math, chemistry and materials science software installed at NERSC. Mathematical Applications...

488

Pacific Northwest Laboratory monthly report to the Nuclear Research and Applications Division for August 1976. [WESF-encapsulated /sup 90/SrF/sub 2/  

DOE Green Energy (OSTI)

At Hanford, strontium is separated from high-level wastes, then converted to the fluoride, and doubly encapsulated in small, high-integrity containers for subsequent long-term storage. The fluoride conversion, encapsulation and storage take place in the Waste Encapsulation and Storage Facilities (WESF). This encapsulated strontium fluoride represents an economical source of /sup 90/Sr if the WESF capsule can be licensed for heat source applications under anticipated use conditions. The objectives of this program are to obtain the data needed to license /sup 90/SrF/sub 2/ heat sources and specifically the WESF /sup 90/SrF/sub 2/ capsules. Research progress is reported on long-term compatibility of TZM with /sup 90/SrF/sub 2/, short-term compatibility of cast iron and Hafnalloy with /sup 90/SrF/sub 2/, and the oxidation resistance and seawater corrosion of Hastelloy C-4. (TFD)

Fullam, H.T.

1976-09-01T23:59:59.000Z

489

Applicant Organization: | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Applicant Organization: Applicant Organization: Applicant Organization: More Documents & Publications BlueFire Ethanol, Inc. Applicant Organization: Applicant Organization:...

490

Physics Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Applications Applications Technetium-99m radioisotope generator developed at Brookhaven. Numerous physics-related programs at Brookhaven have yielded major advances in medicine and various technologies. Brookhaven's nuclear medicine program, which began in the 1950s, uses the Brookhaven Linac Isotope Producer to make radioisotopes for nuclear medicine diagnostics and treatment throughout the world. Today, more than 85 percent of all imaging examinations worldwide use one of the radioisotopes developed at Brookhaven. At Brookhaven's Center for Translational Neuroimaging, researchers can peer into a living brain through the use of various imaging modalities, including positron emission tomography (PET), magnetic resonance imaging (MRI), and optical imaging. Such research has led to a new understanding of

491

Top U.S. Nuclear Official Commends Industry for Submitting 3rd...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(COL) application to the Nuclear Regulatory Commission (NRC) for construction of a new nuclear power plant in the United States. Dominion's application seeks approval to build...

492

SCALE: A modular code system for performing Standardized Computer Analyses for Licensing Evaluation. Volume 1, Part 2: Control modules S1--H1; Revision 5  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automated the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.3 of the system.

NONE

1997-03-01T23:59:59.000Z

493

HFE Process Guidance and Standards for potential application to updating NRC guidance  

SciTech Connect

The U.S. Nuclear Regulatory Commission (NRC) reviews and evaluates the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of these guidance documents to ensure that they remain state-of-the-art design evaluation tools. Thus, the NRC has initiated a project with BNL to update the NRC guidance to remain current with recent research on human performance, advances in HFE methods and tools, and new technology. INL supported Brookhaven National Lab (BNL) to update the detailed HFE review criteria contained in NUREG-0711 and NUREG-0700 based on (1) feedback obtained from end users, (2) the results of NRC research and development efforts supporting the NRC staffs HFE safety reviews, and (3) other material the project staff identify as applicable to the update effort. INL submitted comments on development plans and sections of NUREGs 0800, 0711, and 0700. The contractor prepared the report attached here as the deliverable for this work.

Jacques Hugo; J. J. Persensky

2012-07-01T23:59:59.000Z

494

Application Acceleration  

NLE Websites -- All DOE Office Websites (Extended Search)

Acceleration Acceleration on Current and Future Cray Platforms Alice Koniges, Robert Preissl, Jihan Kim, Lawrence Berkeley National Laboratory David Eder, Aaron Fisher, Nathan Masters, Velimir Mlaker, Lawrence Livermore National Laboratory Stephane Ethier, Weixing Wang, Princeton Plasma Physics Laboratory Martin Head-Gordon, University of California, Berkeley and Nathan Wichmann, Cray Inc. ABSTRACT: Application codes in a variety of areas are being updated for performance on the latest architectures. We describe current bottlenecks and performance improvement areas for applications including plasma physics, chemistry related to carbon capture and sequestration, and material science. We include a variety of methods including advanced hybrid parallelization using multi-threaded MPI, GPU acceleration, libraries and auto- parallelization compilers. KEYWORDS: hybrid

495

Ridefinders Application  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 23 (05-92) Ridefinders Application Please submit this application to the U.S. Department of Energy (DOE) Employee Transportation Coordinator, Room 7A-156, Forrestal. U.S. Department of Energy Privacy Act Statement Check all transportation options which interest you: Carpool: Driver Share Driving Rider Vanpool: Driver Share Driving Rider Do you wish to meet your pool in your neighborhood? No (If no, see Alternate Pickup Locations below.) Yes Participation in the Federal Facility Ridesharing Program is voluntary and a private accommodation of employees rather than a Federal activity. Ridefinders Network will observe Privacy Act requirements because participation requires solicitation of personal information. The information collected will be used to maintain an accurate database of those individuals participating in the program and to provide individual ridematch lists

496

U.S. Department Of Energy Commends Industry Consortia for Making Headway to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Of Energy Commends Industry Consortia for Making Of Energy Commends Industry Consortia for Making Headway to Build Much-Needed, New Nuclear Reactors in U.S. U.S. Department Of Energy Commends Industry Consortia for Making Headway to Build Much-Needed, New Nuclear Reactors in U.S. October 30, 2007 - 4:21pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) Deputy Secretary Clay Sell today commended the Tennessee Valley Authority (TVA) and the NuStart Energy Development consortium (NuStart) for submission of its combined Construction and Operating License (COL) application to the Nuclear Regulatory Commission (NRC). This application marks the second to the NRC in nearly 30 years to build a new nuclear reactor. Specifically, TVA's application seeks approval to build and operate two Westinghouse AP1000

497

Complete PDF version of U.S. Published Application 20090282949 ...  

- All Rights Reserved-> Permitted Use: PDFs may be used internally or to provide to clients, but not sold, licensed, or distributed en masse.

498

NIST Laser Applications Group Homepage  

Science Conference Proceedings (OSTI)

Laser Applications Group. Welcome. The Laser Applications Group advances laser technology for applications in optical ...

2012-05-10T23:59:59.000Z

499

Guideline on Licensing Digital Upgrades - TR-102348 Revision 1 - NEI 01-01: A Revision of EPRI TR-102348 to Reflect Changes to the 10 CFR 50.59 Rule  

Science Conference Proceedings (OSTI)

To continue meeting safety and reliability requirements while controlling operating costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. Upgrades to plant equipment and especially instrumentation and control (I&C) systems typically involve either replacement of analog devices with more modern digital technology or updating existing digital equipment. However, the use of digital technology has raised new design and licensing issues. This guide ...

2002-03-08T23:59:59.000Z

500

SCALE: A modular code system for performing standardized computer analyses for licensing evaluation. Functional modules F1--F8 -- Volume 2, Part 1, Revision 4  

SciTech Connect

SCALE--a modular code system for Standardized Computer Analyses Licensing Evaluation--has been developed by Oak Ridge National Laboratory at the request of the US Nuclear Regulatory Commission. The SCALE system utilizes well-established computer codes and methods within standard analysis sequences that (1) allow an input format designed for the occasional user and/or novice, (2) automate the data processing and coupling between modules, and (3) provide accurate and reliable results. System development has been directed at problem-dependent cross-section processing and analysis of criticality safety, shielding, heat transfer, and depletion/decay problems. Since the initial release of SCALE in 1980, the code system has been heavily used for evaluation of nuclear fuel facility and package designs. This revision documents Version 4.2 of the system. The manual is divided into three volumes: Volume 1--for the control module documentation; Volume 2--for functional module documentation; and Volume 3--for documentation of the data libraries and subroutine libraries.

Greene, N.M.; Petrie, L.M.; Westfall, R.M.; Bucholz, J.A.; Hermann, O.W.; Fraley, S.K. [Oak Ridge National Lab., TN (United States)

1995-04-01T23:59:59.000Z