Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Figure 38. Levelized costs of nuclear electricity generation in ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 38. Levelized costs of nuclear electricity generation in two cases, 2025 (2011 dollars per megawatthour) Reference Small Modular Reactor

2

Figure 34. Ratio of average per megawatthour fuel costs ...  

U.S. Energy Information Administration (EIA)

Title: Figure 34. Ratio of average per megawatthour fuel costs for natural gas combined-cycle plants to coal-fired steam turbines in the RFC west ...

3

Figure 33. Ratio of average per megawatthour fuel costs for ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 33. Ratio of average per megawatthour fuel costs for natural gas combined-cycle plants to coal-fired steam turbines in the SERC southeast ...

4

Figure 27. Ratio of average per megawatthour fuel costs for ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 27. Ratio of average per megawatthour fuel costs for natural gas combined-cycle plants to coal-fired steam turbines in five cases, 2008-2040

5

Figure 1.6 State-Level Energy Consumption Estimates and Estimated ...  

U.S. Energy Information Administration (EIA)

Figure 1.6 State-Level Energy Consumption Estimates and Estimated Consumption per Capita, 2010 Consumption Consumption per Capita

6

Figure 80. Levelized electricity costs for new power plants, 2020 ...  

U.S. Energy Information Administration (EIA)

Gas combined cycle Wind Nuclear Coal Capital O&M Fuel Transmission 2040.00 2020.00 1.35 5.88 5.98 6.61 1.71 6.98 7.73 8.32 0.20 1.31 1.16 0.68 0.20 1.31 1.16 0.68 6 ...

7

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

2018 Levelized Costs AEO 2013 1 2018 Levelized Costs AEO 2013 1 January 2013 Levelized Cost of New Generation Resources in the Annual Energy Outlook 2013 This paper presents average levelized costs for generating technologies that are brought on line in 2018 1 as represented in the National Energy Modeling System (NEMS) for the Annual Energy Outlook 2013 (AEO2013) Early Release Reference case. 2 Both national values and the minimum and maximum values across the 22 U.S. regions of the NEMS electricity market module are presented. Levelized cost is often cited as a convenient summary measure of the overall competiveness of different generating technologies. It represents the per-kilowatthour cost (in real dollars) of building and operating a generating plant over an assumed financial life and duty cycle. Key

8

SYSPLAN. Load Leveling Battery System Costs  

SciTech Connect

SYSPLAN evaluates capital investment in customer side of the meter load leveling battery systems. Such systems reduce the customer`s monthly electrical demand charge by reducing the maximum power load supplied by the utility during the customer`s peak demand. System equipment consists of a large array of batteries, a current converter, and balance of plant equipment and facilities required to support the battery and converter system. The system is installed on the customer`s side of the meter and controlled and operated by the customer. Its economic feasibility depends largely on the customer`s load profile. Load shape requirements, utility rate structures, and battery equipment cost and performance data serve as bases for determining whether a load leveling battery system is economically feasible for a particular installation. Life-cycle costs for system hardware include all costs associated with the purchase, installation, and operation of battery, converter, and balance of plant facilities and equipment. The SYSPLAN spreadsheet software is specifically designed to evaluate these costs and the reduced demand charge benefits; it completes a 20 year period life cycle cost analysis based on the battery system description and cost data. A built-in sensitivity analysis routine is also included for key battery cost parameters. The life cycle cost analysis spreadsheet is augmented by a system sizing routine to help users identify load leveling system size requirements for their facilities. The optional XSIZE system sizing spreadsheet which is included can be used to identify a range of battery system sizes that might be economically attractive. XSIZE output consisting of system operating requirements can then be passed by the temporary file SIZE to the main SYSPLAN spreadsheet.

Hostick, C.J. [Pacific Northwest Lab., Richland, WA (United States)

1988-03-22T23:59:59.000Z

9

Levelized Cost of New Generation Resources in the Annual Energy ...  

U.S. Energy Information Administration (EIA)

costs, the levelized cost ... 4 These results do not include targeted tax credits such as the production or investment tax credit available for some technologies.

10

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

1 1 July 2012 Short-Term Energy Outlook Highlights * EIA projects the West Texas Intermediate (WTI) crude oil spot price to average about $88 per barrel over the second half of 2012 and the U.S. refiner acquisition cost (RAC) of crude oil to average $93 per barrel, both about $7 per barrel lower than last month's Outlook. EIA expects WTI and RAC crude oil prices to remain roughly at these second half levels in 2013. Beginning in this month's Outlook, EIA is also providing a forecast of Brent crude oil spot prices (see Brent Crude Oil Spot Price Added to Forecast), which are expected to average $106 per barrel for 2012 and $98 per barrel in 2013. These price forecasts assume that world oil-consumption-weighted real gross domestic product

11

Estimating the Economic Cost of Sea-Level Rise  

E-Print Network (OSTI)

To improve the estimate of economic costs of future sea-level rise associated with global climate change,

Sugiyama, Masahiro.

12

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

Market Prices and Uncertainty Report Crude Oil Prices: The front month futures price for Brent, the world waterborne crude benchmark, increased by $5.72 per barrel to settle at $115.26 per barrel on September 5 (Figure 1). Front month futures prices for West Texas Intermediate (WTI) crude oil also increased over the same time period but by a lesser amount, to settle at $108.37 per barrel on September 5. The primary drivers of higher crude oil prices over the past five weeks included an uptick in unplanned crude oil production outages and increased tensions in the Middle East. Continued disputes between local governments in the eastern oil producing regions of Libya and the central government in Tripoli combined with worker strikes at

13

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

3 1 3 1 October 2013 Short-Term Energy Outlook Market Prices and Uncertainty Report Crude Oil Prices: Front month futures prices for the Brent and West Texas Intermediate (WTI) crude oil benchmarks fell in September. The Brent contract settled at $109.00 per barrel on October 3, a decline of $6.68 per barrel since September 3, and WTI settled at $103.31 per barrel on October 3, falling by $5.23 per barrel over the same period (Figure 1). These changes marked the first month-over-month declines in crude oil prices since May 2013. The return of some Libyan production and declining refinery runs during September helped put downward pressure on crude oil prices. This is a regular monthly companion to the EIA Short-Term Energy Outlook

14

2017 Levelized Costs AEO 2012 Early Release  

U.S. Energy Information Administration (EIA) Indexed Site

Market Prices and Uncertainty Report Crude Oil Prices: International crude oil benchmarks moved higher in November, showing their first month-over-month increase since August, while U.S. crude oil prices moved higher during the first week of December. The North Sea Brent front month futures price settled at $110.98 per barrel on December 5, an increase of $5.07 per barrel since its close on November 1 (Figure 1). The West Texas Intermediate (WTI) front month futures contract rose $2.77 per barrel compared to November 1, settling at $97.38 per barrel on December 5. A combination of better-than-expected economic data and a continuation of supply outages buoyed international crude oil prices in November. Recent manufacturing data for the United States and China were above expectations, supporting demand for

15

levelized cost of energy | OpenEI Community  

Open Energy Info (EERE)

levelized cost of energy levelized cost of energy Home Kch's picture Submitted by Kch(24) Member 9 April, 2013 - 13:30 MHK Cost Breakdown Structure Draft CBS current energy GMREC LCOE levelized cost of energy marine energy MHK ocean energy The generalized Cost Breakdown Structure (CBS) for marine and hydrokinetic (MHK) projects is a hierarchical structure designed to facilitate the collection and organization of lifecycle costs of any type of MHK project, including wave energy converters and current energy convertners. At a high level, the categories in the CBS will be applicable to all projects; at a detailed level, however, the CBS includes many cost categories that will pertain to one project but not others. It is expected that many of the detailed levels of the CBS will be populated with "NA" or left blank.Upload

16

NREL: Energy Analysis - Levelized Cost of Energy Calculator  

NLE Websites -- All DOE Office Websites (Extended Search)

Levelized Cost of Energy Calculator Levelized Cost of Energy Calculator Transparent Cost Database Button The levelized cost of energy (LCOE) calculator provides a simple calculator for both utility-scale and distributed generation (DG) renewable energy technologies that compares the combination of capital costs, operations and maintenance (O&M), performance, and fuel costs. Note that this does not include financing issues, discount issues, future replacement, or degradation costs. Each of these would need to be included for a thorough analysis. To estimate simple cost of energy, use the slider controls or enter values directly to adjust the values. The calculator will return the LCOE expressed in cents per kilowatt-hour (kWh). The U.S. Department of Energy (DOE) Federal Energy Management Program

17

EIA - Levelized Cost of New Generation Resources in the Annual ...  

U.S. Energy Information Administration (EIA)

Levelized Cost of New Generation Resources in the Annual Energy Outlook 2011. ... such as investment or production tax credits for specified generation sources, ...

18

2017 Levelized Costs AEO 2012 Early Release  

U.S. Energy Information Administration (EIA) Indexed Site

Form EIA-923 Frame Reduction Impact 1 Form EIA-923 Frame Reduction Impact 1 August 30, 2012 Form EIA-923 Frame Reduction Impact Schedule 2 of the Form EIA-923, "Power Plant Operations Report," collects the cost and quality of fossil fuel purchases made by electric power plants with at least 50 megawatts (MW) of nameplate capacity primarily fueled by fossil fuels. The proposal is to raise the threshold to 200 megawatts of nameplate capacity primarily fueled by natural gas, petroleum coke, distillate fuel oil, and residual fuel oil. This would result in reducing the Form EIA-923 overall annual burden by 2.2 percent. The threshold for coal plants will remain at 50 megawatts. Natural gas data collection on Schedule 2 will be reduced from approximately 970 to 603 plants

19

Recent Developments in the Levelized Cost of Energy from  

E-Print Network (OSTI)

1 Recent Developments in the Levelized Cost of Energy from U.S. Wind Power Projects Ryan Wiser This analysis was funded by the Wind & Water Power Program, Office of Energy Efficiency and Renewable Energy factor trends fails to convey recent improvements in the levelized cost of energy (LCOE) from wind

20

2017 Levelized Costs AEO 2012 Early Release  

U.S. Energy Information Administration (EIA) Indexed Site

Residential Energy Consumption Survey (RECS) End-Use Models FAQs 1 Residential Energy Consumption Survey (RECS) End-Use Models FAQs 1 February 2013 Residential Energy Consumption Survey (RECS) End-Use Models FAQs What is an end-use model? An end-use model is a set of equations designed to disaggregate a RECS sample household's total annual fuel consumption into end uses such as space heating, air conditioning, water heating, refrigeration, and so on. These disaggregated values are then weighted up to produce population estimates of total and average energy end uses at various levels of geography, by housing unit type, or other tabulations of interest. Why are end-use models needed? Information regarding how total energy is distributed across various end uses is critical to meeting future energy demand and improving efficiency and building design. Using submeters

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Figure S.1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2- Figures and Table 2.1 2- Figures and Table 2.1 Figure S.1 Figure 1.1 Figure 1.2 Figure 1.3 Figure 2.1 Figure 2.2 Figure 2.3 Figure 3.1 Figure 3.2 Figure 3.3 Figure 3.4 Figure 3.5 Figure 3.6 Figure 3.7 Figure 3.8 Figure 3.9 Figure 3.10 Figure 3.11 Figure 3.12 Figure 3.13 Figure 3.14 Figure 3.15 Figure 3.16 Figure 3.17 Figure 3.18 Figure 3.19 Figure 4.1 Figure 4.2 Figure 4.3 Figure 4.4 Figure 4.5 Figure 4.6 Figure 4.7 Figure 4.8 Figure 4.9 Figure 4.10 Figure 4.11 Figure 4.12 Figure 4.13 Figure 4.14 Figure 4.15 Figure 4.16 Figure 4.17 Figure 4.18 Figure 4.19 J.1 Lewiston Stage Contents Relationship (NOT AVAILABLE IN ELECTRONIC FORMAT) J.2 Keswick Stage Contents Relationship (NOT AVAILABLE IN ELECTRONIC FORMAT) J.3 Natoma Stage Contents Relationship (NOT AVAILABLE IN ELECTRONIC

22

Estimating the economic cost of sea-level rise  

E-Print Network (OSTI)

(cont.) In the case of a classical linear sea-level rise of one meter per century, the use of DIVA generally decreases the protection fraction of the coastline, and results in a smaller protection cost because of high ...

Sugiyama, Masahiro, Ph. D. Massachusetts Institute of Technology

2007-01-01T23:59:59.000Z

23

Levelized cost of coating (LCOC) for selective absorber materials.  

SciTech Connect

A new metric has been developed to evaluate and compare selective absorber coatings for concentrating solar power applications. Previous metrics have typically considered the performance of the selective coating (i.e., solar absorptance and thermal emittance), but cost and durability were not considered. This report describes the development of the levelized cost of coating (LCOC), which is similar to the levelized cost of energy (LCOE) commonly used to evaluate alternative energy technologies. The LCOC is defined as the ratio of the annualized cost of the coating (and associated costs such as labor and number of heliostats required) to the average annual thermal energy produced by the receiver. The baseline LCOC using Pyromark 2500 paint was found to be %240.055/MWht, and the distribution of LCOC values relative to this baseline were determined in a probabilistic analysis to range from -%241.6/MWht to %247.3/MWht, accounting for the cost of additional (or fewer) heliostats required to yield the same baseline average annual thermal energy produced by the receiver. A stepwise multiple rank regression analysis showed that the initial solar absorptance was the most significant parameter impacting the LCOC, followed by thermal emittance, degradation rate, reapplication interval, and downtime during reapplication.

Ho, Clifford Kuofei; Pacheco, James Edward

2013-09-01T23:59:59.000Z

24

NREL-Levelized Cost of Energy Calculator | Open Energy Information  

Open Energy Info (EERE)

NREL-Levelized Cost of Energy Calculator NREL-Levelized Cost of Energy Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Simple Cost of Energy Calculator Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Non-renewable Energy, Biomass, Geothermal, Hydrogen, Solar, Water Power, Wind Phase: Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Create Early Successes, Evaluate Effectiveness and Revise as Needed Topics: Finance, Market analysis, Technology characterizations Resource Type: Software/modeling tools User Interface: Website Website: www.nrel.gov/analysis/tech_lcoe.html Web Application Link: www.nrel.gov/analysis/tech_lcoe.html OpenEI Keyword(s): Energy Efficiency and Renewable Energy (EERE) Tools

25

Battery-level material cost model facilitates high-power li-ion battery cost reductions.  

SciTech Connect

Under the FreedomCAR Partnership, Argonne National Laboratory (ANL) is working to identify and develop advanced anode, cathode, and electrolyte components that can significantly reduce the cost of the cell chemistry, while simultaneously enhancing the calendar life and inherent safety of high-power Li-Ion batteries. Material cost savings are quantified and tracked via the use of a cell and battery design model that establishes the quantity of each material needed in batteries designed to meet the requirements of hybrid electric vehicles (HEVs). In order to quantify the material costs, relative to the FreedomCAR battery cost goals, ANL uses (1) laboratory cell performance data, (2) its battery design model and (3) battery manufacturing process yields to create battery-level material cost models. Using these models and industry-supplied material cost information, ANL assigns battery-level material costs for different cell chemistries. These costs can then be compared to the battery cost goals to determine the probability of meeting the goals with these cell chemistries. The most recent freedomCAR cost goals for 25-kW and 40-kW power-assist HEV batteries are $500 and $800, respectively, which is $20/kW in both cases. In 2001, ANL developed a high-power cell chemistry that was incorporated into high-power 18650 cells for use in extensive accelerated aging and thermal abuse characterization studies. This cell chemistry serves as a baseline for this material cost study. It incorporates a LiNi0.8Co0.15Al0.05O2 cathode, a synthetic graphite anode, and a LiPF6 in EC:EMC electrolyte. Based on volume production cost estimates for these materials-as well as those for binders/solvents, cathode conductive additives, separator, and current collectors--the total cell winding material cost for a 25-kW power-assist HEV battery is estimated to be $399 (based on a 48- cell battery design, each cell having a capacity of 15.4 Ah). This corresponds to {approx}$16/kW. Our goal is to reduce the cell winding material cost to <$10/kW, in order to allow >$10/kW for the cell and battery manufacturing costs, as well as profit for the industrial manufacturer. The material cost information is obtained directly from the industrial material suppliers, based on supplying the material quantities necessary to support an introductory market of 100,000 HEV batteries/year. Using its battery design model, ANL provides the material suppliers with estimates of the material quantities needed to meet this market, for both 25-kW and 40-kW power-assist HEV batteries. Also, ANL has funded a few volume-production material cost analyses, with industrial material suppliers, to obtain needed cost information. In a related project, ANL evaluates and develops low-cost advanced materials for use in high-power Li-Ion HEV batteries. [This work is the subject of one or more separate papers at this conference.] Cell chemistries are developed from the most promising low-cost materials. The performance characteristics of test cells that employ these cell chemistries are used as input to the cost model. Batteries, employing these cell chemistries, are designed to meet the FreedomCAR power, energy, weight, and volume requirements. The cost model then provides a battery-level material cost and material cost breakdown for each battery design. Two of these advanced cell chemistries show promise for significantly reducing the battery-level material costs (see Table 1), as well as enhancing calendar life and inherent safety. It is projected that these two advanced cell chemistries (A and B) could reduce the battery-level material costs by an estimated 24% and 43%, respectively. An additional cost advantage is realized with advanced chemistry B, due to the high rate capability of the 3-dimensional LiMn{sub 2}O{sub 4} spinel cathode. This means that a greater percentage of the total Ah capacity of the cell is usable and cells with reduced Ah capacity can be used. This allows for a reduction in the quantity of the anode, electrolyte, separator, and current collector materials needed f

Henriksen, G.; Chemical Engineering

2003-01-01T23:59:59.000Z

26

Overview of Levelized Cost of Energy in the AEO  

U.S. Energy Information Administration (EIA) Indexed Site

Presented to the EIA Energy Conference Presented to the EIA Energy Conference June 17, 2013 Chris Namovicz Assessing the Economic Value of New Utility-Scale Renewable Generation Projects Overview * Levelized cost of energy (LCOE) has been used by planners, analysts, policymakers, advocates and others to assess the economic competitiveness of technology options in the electric power sector * While of limited usefulness in the analysis of "conventional" utility systems, this approach is not generally appropriate when considering "unconventional" resources like wind and solar * EIA is developing a new framework to address the major weaknesses of LCOE analysis

27

ESS 2012 Peer Review - Estimation of Capital and Levelized Cost...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

cost for 1 MW systems with various EP ratios Validated PNNL model using PNNL 1 kW, 1 kWh stack performance data Provided a roadmap for cost effective redox flow battery systems...

28

Analyzing the level of service and cost trade-offs in cold chain transportation  

E-Print Network (OSTI)

This thesis discusses the tradeoff between transportation cost and the level of service in cold chain transportation. Its purpose is to find the relationship between transportation cost and the level of service in cold ...

Liu, Saiqi

2009-01-01T23:59:59.000Z

29

Recent Developments in the Levelized Cost of Energy from U.S...  

NLE Websites -- All DOE Office Websites (Extended Search)

Recent Developments in the Levelized Cost of Energy from U.S. Wind Power Projects Title Recent Developments in the Levelized Cost of Energy from U.S. Wind Power Projects...

30

APPENDIX A: FIGURES  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX A: FIGURES Project Name: Archbold Area Schools Wind Turbine Source Information: USGS, TRG Survey Figure Name: Turbine Location Notes: Turbine Location TRG Archbold...

31

APPENDIX A: FIGURES  

NLE Websites -- All DOE Office Websites (Extended Search)

APPENDIX A: FIGURES Project Name: Pettisville Local Schools Wind Turbine Source Information: USGS, TRG Survey Figure Name: Turbine Location Notes: Turbine Location TRG...

32

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

rates, and (2) monthly electricity bill impacts for a typical residentialElectricity Rate Impacts by RPS Cost Study Study - Incremental RPS Target % Figure 6. Typical Residential

Chen, Cliff

2009-01-01T23:59:59.000Z

33

Recent Developments in the Levelized Cost of Energy from U.S...  

NLE Websites -- All DOE Office Websites (Extended Search)

Recent Developments in the Levelized Cost of Energy from U.S. Wind Power Projects Ryan Wiser, Lawrence Berkeley National Laboratory Eric Lantz, National Renewable Energy Laboratory...

34

Preliminary estimates of cost savings for defense high level waste vitrification options  

SciTech Connect

The potential for realizing cost savings in the disposal of defense high-level waste through process and design modificatins has been considered. Proposed modifications range from simple changes in the canister design to development of an advanced melter capable of processing glass with a higher waste loading. Preliminary calculations estimate the total disposal cost (not including capital or operating costs) for defense high-level waste to be about $7.9 billion dollars for the reference conditions described in this paper, while projected savings resulting from the proposed process and design changes could reduce the disposal cost of defense high-level waste by up to $5.2 billion.

Merrill, R.A.; Chapman, C.C.

1993-09-01T23:59:59.000Z

35

Production Cost Modeling for High Levels of Photovoltaics Penetration  

DOE Green Energy (OSTI)

The goal of this report is to evaluate the likely avoided generation, fuels, and emissions resulting from photovoltaics (PV) deployment in several U.S. locations and identify new tools, methods, and analysis to improve understanding of PV impacts at the grid level.

Denholm, P.; Margolis, R.; Milford, J.

2008-02-01T23:59:59.000Z

36

Waste Management Facilities cost information for mixed low-level waste. Revision 1  

Science Conference Proceedings (OSTI)

This report contains preconceptual designs and planning level life-cycle cost estimates for managing mixed low-level waste. The report`s information on treatment, storage, and disposal modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the US Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report.

Shropshire, D.; Sherick, M.; Biadgi, C.

1995-06-01T23:59:59.000Z

37

Low-Cost Options for Moderate Levels of Mercury Control  

Science Conference Proceedings (OSTI)

This is the final technical report for a three-site project that is part of an overall program funded by the U.S. Department of Energy's National Energy Technology Laboratory (DOE/NETL) and industry partners to obtain the necessary information to assess the feasibility and costs of controlling mercury from coal-fired utility plants. This report summarizes results from tests conducted at MidAmerican's Louisa Generating Station and Entergy's Independence Steam Electric Station (ISES) and sorbent screening at MidAmerican's Council Bluffs Energy Center (CBEC) (subsequently renamed Walter Scott Energy Center (WSEC)). Detailed results for Independence and Louisa are presented in the respective Topical Reports. As no full-scale testing was conducted at CBEC, screening updates were provided in the quarterly updates to DOE. ADA-ES, Inc., with support from DOE/NETL, EPRI, and other industry partners, has conducted evaluations of EPRI's TOXECON II{trademark} process and of high-temperature reagents and sorbents to determine the capabilities of sorbent/reagent injection, including activated carbon, for mercury control on different coals and air emissions control equipment configurations. An overview of each plant configuration is presented: (1) MidAmerican's Louisa Generating Station burns Powder River Basin (PRB) coal in its 700-MW Unit 1 and employs hot-side electrostatic precipitators (ESPs) with flue gas conditioning for particulate control. This part of the testing program evaluated the effect of reagents used in the existing flue gas conditioning on mercury removal. (2) MidAmerican's Council Bluffs Energy Center typically burns PRB coal in its 88-MW Unit 2. It employs a hot-side ESP for particulate control. Solid sorbents were screened for hot-side injection. (3) Entergy's Independence Steam Electric Station typically burns PRB coal in its 880-MW Unit 2. Various sorbent injection tests were conducted on 1/8 to 1/32 of the flue gas stream either within or in front of one of four ESP boxes (SCA = 542 ft{sup 2}/kacfm), specifically ESP B. Initial mercury control evaluations indicated that although significant mercury control could be achieved by using the TOXECON II{trademark} design, the sorbent concentration required was higher than expected, possibly due to poor sorbent distribution. Subsequently, the original injection grid design was modeled and the results revealed that the sorbent distribution pattern was determined by the grid design, fluctuations in flue gas flow rates, and the structure of the ESP box. To improve sorbent distribution, the injection grid and delivery system were redesigned and the effectiveness of the redesigned system was evaluated. This project was funded through the DOE/NETL Innovations for Existing Plants program. It was a Phase II project with the goal of developing mercury control technologies that can achieve 50-70% mercury capture at costs 25-50% less than baseline estimates of $50,000-$70,000/lb of mercury removed. Results from testing at Independence indicate that the DOE goal was successfully achieved. Further improvements in the process are recommended, however. Results from testing at Louisa indicate that the DOE goal was not achievable using the tested high-temperature sorbent. Sorbent screening at Council Bluffs also indicated that traditional solid sorbents may not achieve significant mercury removal in hot-side applications.

Sharon Sjostrom

2008-02-09T23:59:59.000Z

38

Levelized Costs for Nuclear, Gas and Coal for Electricity, under the Mexican Scenario  

SciTech Connect

In the case of new nuclear power stations, it is necessary to pay special attention to the financial strategy that will be applied, time of construction, investment cost, and the discount and return rate. The levelized cost quantifies the unitary cost of the electricity (the kWh) generated during the lifetime of the nuclear power plant; and allows the immediate comparison with the cost of other alternative technologies. The present paper shows levelized cost for different nuclear technologies and it provides comparison among them as well as with gas and coal electricity plants. For the calculations we applied our own methodology to evaluate the levelized cost considering investment, fuel and operation and maintenance costs, making assumptions for the Mexican market, and taking into account the gas prices projections. The study also shows comparisons using different discount rates (5% and 10%), and some comparisons between our results and an OECD 1998 study. The results are i n good agreement and shows that nuclear option is cost competitive in Mexico on the basis of levelized costs.

Palacios, J.C.; Alonso, G.; Ramirez, R.; Gomez, A.; Ortiz, J.; Longoria, L.C.

2004-10-06T23:59:59.000Z

39

The levelized cost of energy for distributed PV : a parametric study.  

Science Conference Proceedings (OSTI)

The maturation of distributed solar PV as an energy source requires that the technology no longer compete on module efficiency and manufacturing cost ($/Wp) alone. Solar PV must yield sufficient energy (kWh) at a competitive cost (c/kWh) to justify its system investment and ongoing maintenance costs. These metrics vary as a function of system design and interactions between parameters, such as efficiency and area-related installation costs. The calculation of levelized cost of energy includes energy production and costs throughout the life of the system. The life of the system and its components, the rate at which performance degrades, and operation and maintenance requirements all affect the cost of energy. Cost of energy is also affected by project financing and incentives. In this paper, the impact of changes in parameters such as efficiency and in assumptions about operating and maintenance costs, degradation rate and system life, system design, and financing will be examined in the context of levelized cost of energy.

Goodrich, Alan C. (National Renewable Energy Laboratory); Cameron, Christopher P.

2010-06-01T23:59:59.000Z

40

Life-Cycle Cost Study for a Low-Level Radioactive Waste Disposal Facility in Texas  

SciTech Connect

This report documents the life-cycle cost estimates for a proposed low-level radioactive waste disposal facility near Sierra Blanca, Texas. The work was requested by the Texas Low-Level Radioactive Waste Disposal Authority and performed by the National Low-Level Waste Management Program with the assistance of Rogers and Associates Engineering Corporation.

B. C. Rogers; P. L. Walter (Rogers and Associates Engineering Corporation); R. D. Baird

1999-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Interim report: Waste management facilities cost information for mixed low-level waste  

SciTech Connect

This report contains preconceptual designs and planning level life-cycle cost estimates for treating alpha and nonalpha mixed low-level radioactive waste. This report contains information on twenty-seven treatment, storage, and disposal modules that can be integrated to develop total life cycle costs for various waste management options. A procedure to guide the US Department of Energy and its contractor personnel in the use of estimating data is also summarized in this report.

Feizollahi, F.; Shropshire, D.

1994-03-01T23:59:59.000Z

42

Comparison of costs for alternative mixed low-level waste treatment systems  

SciTech Connect

Total life cycle costs (TLCCs), including disposal costs, of thermal, nonthermal and enhanced nonthermal systems were evaluated to guide future research and development programs for the treatment of mixed low-level waste (MLLW) consisting of RCRA hazardous and low-level radioactive wastes. In these studies, nonthermal systems are defined as those systems that process waste at temperatures less than 350 C. Preconceptual designs and costs were developed for thirty systems with a capacity (2,927 lbs/hr) to treat the DOE MLLW stored inventor y(approximately 236 million pounds) in 20 years in a single, centralized facility. A limited comparison of the studies` results is presented in this paper. Sensitivity of treatment costs with respect to treatment capacity, number of treatment facilities, and system availability were also determined. The major cost element is operations and maintenance (O and M), which is 50 to 60% of the TLCC for both thermal and nonthermal systems. Energy costs constitute a small fraction (< 1%) of the TLCCs. Equipment cost is only 3 to 5% of the treatment cost. Evaluation of subsystem costs demonstrate that receiving and preparation is the highest cost subsystem at about 25 to 30% of the TLCC for both thermal and nonthermal systems. These studies found no cost incentives to use nonthermal or hybrid (combined nonthermal treatment with stabilization by vitrification) systems in place of thermal systems. However, there may be other incentives including fewer air emissions and less local objection to a treatment facility. Building multiple treatment facilities to treat the same total mass of waste as a single facility would increase the total treatment cost significantly, and improved system availability decreases unit treatment costs by 17% to 30%.

Schwinkendorf, W.E.; Harvego, L. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Cooley, C.R. [Dept. of Energy (United States); Biagi, C. [Morrison Knudsen (United States)

1996-12-31T23:59:59.000Z

43

Figure 6 - TMS  

Science Conference Proceedings (OSTI)

Figure 6. In wet stretching, (a) the fiber is allowed to contract unrestrained up to the supercontracted length; (b) it is stretched to the selected length and the ends

44

Cost Savings and Energy Reduction: Bi-Level Lighting Retrofits in Multifamily Buildings  

E-Print Network (OSTI)

Community Environmental Center implements Bi- Level Lighting fixtures as a component of cost-effective multifamily retrofits. These systems achieve substantial energy savings by automatically reducing lighting levels when common areas are unoccupied. Because there is a lack of empirical evidence documenting the performance of these systems, this paper uses electric consumption data collected from buildings before and after retrofits were performed, and analyzes the cost and consumption savings achieved through installation of Bi-Level Lighting systems. The results of this report demonstrate that common areas that are currently not making use of Bi-Level lighting systems would achieve significant financial and environmental benefits from Bi-Level focused retrofits. This project concludes that building codes should be updated to reflect improvements in Bi-Level Lighting technologies, and that government-sponsored energy efficiency programs should explicitly encourage or mandate Bi-Level Lighting installation components of subsidized retrofit projects.

Ackley, J.

2010-01-01T23:59:59.000Z

45

MECS Fuel Oil Figures  

U.S. Energy Information Administration (EIA) Indexed Site

: Percentage of Total Purchased Fuels by Type of Fuel : Percentage of Total Purchased Fuels by Type of Fuel Figure 1. Percent of Total Purchased Fuel Sources: Energy Information Administration. Office of Energy Markets and End Use, Manufacturing Energy Consumption Survey (MECS): Consumption of Energy; U.S. Department of Commerce, Bureau of the Census, Annual Survey of Manufactures (ASM): Statistics for Industry Groups and Industries: Statistical Abstract of the United States. Note: The years below the line on the "X" Axis are interpolated data--not directly from the Manufacturing Energy Consumption Survey or the Annual Survey of Manufactures. Figure 2: Changes in the Ratios of Distillate Fuel Oil to Natural Gas Figure 2. Changes in the Ratios of Distillate Fuel Oil to Natural Gas Sources: Energy Information Administration. Office of

46

Nuclear Fuel Recycling - the Value of the Separated Transuranics and the Levelized Cost of Electricity  

E-Print Network (OSTI)

We analyze the levelized cost of electricity (LCOE) for three different fuel cycles: a Once-Through Cycle, in which the spent fuel is sent for disposal after one use in a reactor, a Twice-Through Cycle, in which the spent ...

Parsons, John E.

47

Microsoft Word - figure_18.doc  

Gasoline and Diesel Fuel Update (EIA)

0 0 0 2 4 6 8 10 12 14 2001 2002 2003 2004 2005 Dollars per Thousand Cubic Feet 0 40 80 120 160 200 240 280 320 360 400 440 Dollars per Thousand Cubic Meters Residential Commercial Industrial Electric Power Vehicle Fuel Figure 18. Average Price of Natural Gas Delivered to Consumers in the United States, 2001-2005 Note: Coverage for prices varies by consumer sector. See Appendix A for further discussion on consumer prices. Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers"; Federal Energy Regulatory Commission (FERC), Form FERC-423, "Monthly Report of Cost and Quality of Fuels for

48

Wind Levelized Cost of Energy: A Comparison of Technical and Financing Input Variables  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 October 2009 Wind Levelized Cost of Energy: A Comparison of Technical and Financing Input Variables Karlynn Cory and Paul Schwabe National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-6A2-46671 October 2009 Wind Levelized Cost of Energy: A Comparison of Technical and Financing Input Variables Karlynn Cory and Paul Schwabe Prepared under Task No. WER9.3550 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government.

49

Analyzing the Levelized Cost of Centralized and Distributed Hydrogen Production Using the H2A Production Model, Version 2  

DOE Green Energy (OSTI)

Analysis of the levelized cost of producing hydrogen via different pathways using the National Renewable Energy Laboratory's H2A Hydrogen Production Model, Version 2.

Ramsden, T.; Steward, D.; Zuboy, J.

2009-09-01T23:59:59.000Z

50

Cost-effectiveness of recommended nurse staffing levels for short-stay skilled nursing facility patients  

E-Print Network (OSTI)

Anonymous: Employer Costs for Employee Compensation--BioMed Central Open Access Cost-effectiveness of recommendeddiagnoses. However, the cost-effectiveness of increasing

Ganz, David A; Simmons, Sandra F; Schnelle, John F

2005-01-01T23:59:59.000Z

51

Wind Levelized Cost of Energy: A Comparison of Technical and Financing Input Variables  

DOE Green Energy (OSTI)

The expansion of wind power capacity in the United States has increased the demand for project development capital. In response, innovative approaches to financing wind projects have emerged and are proliferating in the U.S. renewable energy marketplace. Wind power developers and financiers have become more efficient and creative in structuring their financial relationships, and often tailor them to different investor types and objectives. As a result, two similar projects may use very different cash flows and financing arrangements, which can significantly vary the economic competitiveness of wind projects. This report assesses the relative impact of numerous financing, technical, and operating variables on the levelized cost of energy (LCOE) associated with a wind project under various financing structures in the U.S. marketplace. Under this analysis, the impacts of several financial and technical variables on the cost of wind electricity generation are first examined individually to better understand the relative importance of each. Then, analysts examine a low-cost and a high-cost financing scenario, where multiple variables are modified simultaneously. Lastly, the analysis also considers the impact of a suite of financial variables versus a suite of technical variables.

Cory, K.; Schwabe, P.

2009-10-01T23:59:59.000Z

52

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings  

SciTech Connect

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract

Shonder, John A [ORNL; Hughes, Patrick [ORNL

2009-04-01T23:59:59.000Z

53

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings  

SciTech Connect

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract prices. In 16 of the 22 projects (

Shonder, John A [ORNL; Hughes, Patrick [ORNL

2009-04-01T23:59:59.000Z

54

Technology, Safety and Costs of Decommissioning a Reference Low-Level Waste Burial Ground. Appendices  

SciTech Connect

Safety and cost information are developed for the conceptual decommissioning of commercial low-level waste (LLW) burial grounds. Two generic burial grounds, one located on an arid western site and the other located on a humid eastern site, are used as reference facilities for the study. The two burial grounds are assumed to have the same site capacity for waste, the same radioactive waste inventory, and similar trench characteristics and operating procedures. The climate, geology. and hydrology of the two sites are chosen to be typical of real western and eastern sites. Volume 2 (Appendices) contains the detailed analyses and data needed to support the results given in Volume 1.

None

1980-06-01T23:59:59.000Z

55

EIS-0023-FEIS-Figures-1979.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NORTM NORTM CAROLINA 2 -- r /'- 3Charlo,te Gree,v:; I, o s. \ '~ ( % SOUTH CAROLINA ".4 o " .Alkenoco'"mb'a A1l.a,to \ August. ( SRP O Macon \ GEORGIA ? Charleston 50 MI ".* / 100 Ml 150 Mi 1 \ ATLANTIC OCEAN Sov.nn.h / FIGURE III-1. Location of SRP Relative to Surrounding Population Centers III-2 --- - FIGURE III-2. The Savannah River Plant III-3 FIGURE 'III-3. Profile of Geologic Formation Beneath the Savannah River Plant . III-5 ,-, -,.. . . . . . 5 .-- -612 CRYSTALLINE ROCK . II rfoce FIGURE III-4. Hydrostatic Head in Ground Water Near H Area III-8 ~'z 'Kw ) -.- ________ Alu EN F PLATEAU ";<--'-----% \ ~//i.s,t,,7 --- I '220--- Heed in Tuscaloosa ft H20 obove me.. $,0 level - 5 0 5 10 ,5 MILES FIGURE III-5. Flow in Tuscaloosa Aquifer (Ongoing hydrographic measurements indicate that this flow pattern has remained the same under the SRP site since the early 1950' s.) 111-10 . FIGURE

56

ESS 2012 Peer Review - Iron Based Flow Batteries for Low Cost Grid Level Energy Storage - Jesse Wainright, Case Western Reserve  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

authors gratefully acknowledge the support of the Department of Energy/Office of Electricity's Energy Storage Program. authors gratefully acknowledge the support of the Department of Energy/Office of Electricity's Energy Storage Program. Iron Based Flow Batteries for Low Cost Grid Level Energy Storage J.S. Wainright, R. F. Savinell, P.I.s Dept. of Chemical Engineering, Case Western Reserve University Purpose Impact on Iron Based Batteries on the DOE OE Energy Storage Mission Recent Results Recent Results Develop efficient, cost-effective grid level storage capability based on iron. Goals of this Effort: * Minimize Cost/Watt by increasing current density - Hardware Cost >> Electrolyte Cost * Minimize Cost/Whr by increasing plating capacity * Maximize Efficiency by minimizing current lost to hydrogen evolution Electrochemistry of the all-Iron system:

57

Microsoft Word - Figure_15.docx  

U.S. Energy Information Administration (EIA) Indexed Site

Source: Energy Information Administration (EIA), Form EIA-191A, "Annual Underground Gas Storage Report." U.S. Energy Information Administration | Natural Gas Annual Figure 16....

58

Silicon Nanoparticle Biocompatibility Figure 1  

Science Conference Proceedings (OSTI)

... Figure 2. Effect of SNs and SMs on cell survival percentage in RAW 264.7 cells based on trypan blue dye exclusion (A) and MTT (B) assay. ...

2012-10-01T23:59:59.000Z

59

Three prominent figures (3PF)  

Science Conference Proceedings (OSTI)

Three Prominent Figures, a sub-group of the VOLT Collective (http://www.voltcollective.com) is a performance piece combining live DJ-ing, video art, and physical computing to explore non-invasive musical expression. Three Prominent Figures will be presented ...

Roberto Osorio-Goenaga; Gregory Boland; Nathaniel Weiner

2007-06-01T23:59:59.000Z

60

ESS 2012 Peer Review - Estimation of Capital and Levelized Cost for Redox Flow Batteries - Vilayanur Viswanathan, PNNL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Estimation of Capital and Levelized Estimation of Capital and Levelized Cost for Redox Flow Batteries V. Viswanathan, A. Crawford, L. Thaller 1 , D. Stephenson, S. Kim, W. Wang, G. Coffey, P. Balducci, Z. Gary Yang 2 , Liyu Li 2 , M. Kintner-Meyer, V. Sprenkle 1 Consultant 2 UniEnergy Technology September 28, 2012 USDOE-OE ESS Peer Review Washington, DC Dr. Imre Gyuk - Energy Storage Program Manager, Office of Electricity Delivery and Energy Reliability 1 What are we trying to accomplish? PNNL grid analytics team has established ESS cost targets for various applications PNNL cost/performance model estimates cost for redox flow battery systems of various chemistries drives research internally to focus on most important components/parameters/metrics for cost reduction and performance improvement

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

KT Monograph Pottery Figures  

E-Print Network (OSTI)

-692 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 0 10 28 Excavations at Kilise Tepe 1994-98: D6:1 - Iron Age Cypriot jugs in Leeds Museum D 37 2 19 64 D 36 5 19 64 10 0 29 Excavations at Kilise Tepe 1994-98: D6:2 - Level II ceramics...

Rickhards, T; Postgate, E; Thomas, D C; Postgate, J N

2005-03-16T23:59:59.000Z

62

Cost of stockouts in the microprocessor business and its impact in determining the optimal service level/  

E-Print Network (OSTI)

In order to develop optimal inventory policies, it is essential to know the consequences of stockouts and the costs related to each kind of stockout; at Intel, however, such costs have not yet been quantified. The primary ...

Sonnet, Maria Claudia

2005-01-01T23:59:59.000Z

63

Microsoft Word - figure_24.doc  

U.S. Energy Information Administration (EIA) Indexed Site

1 Figure 25. Average price of natural gas delivered to U.S. onsystem industrial consumers, 2011 (dollars per thousand cubic feet) U.S. Energy Information Administration | Natural...

64

Microsoft Word - figure_03.doc  

U.S. Energy Information Administration (EIA) Indexed Site

0 U.S. Energy Information Administration | Natural Gas Annual Figure 3. Marketed production of natural gas in the United States and the Gulf of Mexico, 2011 (million cubic feet)...

65

Microsoft Word - figure_99.doc  

U.S. Energy Information Administration (EIA) Indexed Site

6 U.S. Energy Information Administration | Natural Gas Annual Figure 6. Natural gas processing in the United States and the Gulf of Mexico, 2011 (million cubic feet) None 1-15,000...

66

Comparative analysis of energy costing methodologies. Appendix: report on levelized busbar-costing workshop held at MITRE/Metrek, June 29-30, 1978  

DOE Green Energy (OSTI)

The proceedings of a workshop on levelized busbar costing methodologies which was held at MITRE/Metrek on June 29 and 30, 1978 are described. Particular emphasis was placed on consideration of geothermal energy sources. The objective of the workshop was to determine whether a consensus could be developed regarding the most appropriate methodologies and assumptions for levelized energy costing. The workshop was attended by representatives from energy resource, utility and engineering design companies, and by representatives of the Division of Geothermal Energy and R and D contractors for this Division. It was found that year-by-year calculations in current dollars were generally preferred, using either Discounted Cash Flow or Revenue Requirements methods. No consensus emerged on choice of discount rate or financial parameters such as debt/equity ratio, and tax credit carry forward/carry back provisions. It was felt that engineering aspects deserve close attention.

Leigh, J.G.

1979-02-01T23:59:59.000Z

67

Chapter 3 Appendices 1 Appendix 3A: Levelized Cost of Electricity and  

E-Print Network (OSTI)

on the costs of coal, capital, and labor in Table 3A.1, natural gas with CCS becomes economic at the prices of higher than 100$/ tCO2 for a range $2­6$/MMBtu natural gas prices. At the higher natural gas prices, coal-Cost Generation Technology Zones for Coal and Natural Gas with and without CCS for Different Natural Gas Prices

Reuter, Martin

68

Report on waste burial charges. Escalation of decommissioning waste disposal costs at low-level waste burial facilities, Revision 4  

SciTech Connect

One of the requirements placed upon nuclear power reactor licensees by the U.S. Nuclear Regulatory Commission (NRC) is for the licensees to periodically adjust the estimate of the cost of decommissioning their plants, in dollars of the current year, as part of the process to provide reasonable assurance that adequate funds for decommissioning will be available when needed. This report, which is scheduled to be revised periodically, contains the development of a formula for escalating decommissioning cost estimates that is acceptable to the NRC. The sources of information to be used in the escalation formula are identified, and the values developed for the escalation of radioactive waste burial costs, by site and by year, are given. The licensees may use the formula, the coefficients, and the burial escalation factors from this report in their escalation analyses, or they may use an escalation rate at least equal to the escalation approach presented herein. This fourth revision of NUREG-1307 contains revised spreadsheet results for the disposal costs for the reference PWR and the reference BWR and the ratios of disposal costs at the Washington, Nevada, and South Carolina sites for the years 1986, 1988, 1991 and 1993, superseding the values given in the May 1993 issue of this report. Burial cost surcharges mandated by the Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) have been incorporated into the revised ratio tables for those years. In addition, spreadsheet results for the disposal costs for the reference reactors and ratios of disposal costs at the two remaining burial sites in Washington and South Carolina for the year 1994 are provided. These latter results do not include any LLRWPAA surcharges, since those provisions of the Act expired at the end of 1992. An example calculation for escalated disposal cost is presented, demonstrating the use of the data contained in this report.

Not Available

1994-06-01T23:59:59.000Z

69

Report on waste burial charges: Escalation of decommissioning waste disposal costs at Low-Level Waste Burial facilities. Revision 5  

SciTech Connect

One of the requirements placed upon nuclear power reactor licensees by the US Nuclear Regulatory Commission (NRC) is for the licensees to periodically adjust the estimate of the cost of decommissioning their plants, in dollars of the current year, as part of the process to provide reasonable assurance that adequate funds for decommissioning will be available when needed. This report, which is scheduled to be revised periodically, contains the development of a formula for escalating decommissioning cost estimates that is acceptable to the NRC. The sources of information to be used in the escalation formula are identified, and the values developed for the escalation of radioactive waste burial costs, by site and by year, are given. The licensees may use the formula, the coefficients, and the burial escalation factors from this report in their escalation analyses, or they may use an escalation rate at least equal to the escalation approach presented herein. This fifth revision of NUREG-1307 contains revised spreadsheet results for the disposal costs for the reference PWR and the reference BWR and the ratios of disposal costs at the Washington, Nevada, and South Carolina sites for the years 1986, 1988, 1991, 1993, and 1994, superseding the values given in the June 1994 issue of this report. Burial cost surcharges mandated by the Low-Level Radioactive Waste Policy Amendments Act of 1985 (LLRWPAA) have been incorporated into the revised ratio tables for those years. In addition, spreadsheet results for the disposal costs for the reference reactors and ratios of disposal costs at the two remaining burial sites in Washington and South Carolina for the year 1995 are provided. These latter results do not include any LLRWPAA surcharges, since those provisions of the Act expired at the end of 1992. An example calculation for escalated disposal cost is presented, demonstrating the use of the data contained in this report.

NONE

1995-08-01T23:59:59.000Z

70

A Scalable Methodology for Cost Estimation in a Transformational High-Level Design Space Exploration Environment  

E-Print Network (OSTI)

Objective of the methodology presented in this paper is to perform design space exploration on a high level of abstraction by applying high-level transformations. To realize a design loop which is close and settled on upper design levels, a high-level estimation step is integrated. In this paper, several estimation methodologies fixed on different states of the high-level synthesis process are examined with respect to their aptitude on controlling the transformational design space exploration process.

Gerlach

1998-01-01T23:59:59.000Z

71

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

alternate (mostly non-renewable) energy sources. Employmentalso has a non-mandated renewable energy objective thatNon- Govt. source Figure 26. Principal Sources of Renewable Energy

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

72

Electric power high-voltage transmission lines: Design options, cost, and electric and magnetic field levels  

SciTech Connect

This report provides background information about (1) the electric and magnetic fields (EMFs) of high-voltage transmission lines at typical voltages and line configurations and (2) typical transmission line costs to assist on alternatives in environmental documents. EMF strengths at 0 {+-} 200 ft from centerline were calculated for ac overhead lines, and for 345 and 230-kV ac underground line and for a {+-}450-kV dc overhead line. Compacting and height sensitivity factors were computed for the variation in EMFs when line conductors are moved closer or raised. Estimated costs for the lines are presented and discussed so that the impact of using alternative strategies for reducing EMF strengths and the implications of implementing the strategies can be better appreciated.

Stoffel, J.B.; Pentecost, E.D.; Roman, R.D.; Traczyk, P.A.

1994-11-01T23:59:59.000Z

73

BILIWG: Consistent "Figures of Merit" (Presentation)  

NLE Websites -- All DOE Office Websites (Extended Search)

BILIWG: Consistent "Figures of Merit" BILIWG: Consistent "Figures of Merit" A finite set of results reported in consistent units * To track progress of individual projects on a consistent basis * To enable comparing projects in a transparent manner Potential BILIWG Figures of Merit Key BILI Distributed Reforming Targets * Cost ($/kg of H2): H2A analysis - Distributed reforming station,1000 kg/day ave./daily dispensed, 5000/6250 psi (and 10,000/12,000 psi) dispensing, 500 units/yr. * nth unit vs. 500 units/yr ? * production unit only (with 300 psi outlet pressure) ? * Production unit efficiency: LHV H2 out/(LHV of feedstocks and all other energy in) GTG - WTG efficiency? - Feedstock conversion energy efficiency? * Production unit capital cost: Distributed reforming station,1000 kg/day ave./daily dispensed, 300 psi outlet pressure

74

EIS-0268-Figures-1997.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOFJ'EIS-0268 DOFJ'EIS-0268 - PKw.2F Figure 4-L L-Lake and environs. 4-3 -- =----- 90 --m--- -m- EAST o (C.nti""ed O"figure 4.4b) AA 320 1 300 1 Fourmile Indian Grave Upland Pen Branch Brench Formation Branch 280 ~ 280 240 : E -220 ~ L 200 180 I 160 140 1 I I 1 2 3 4 5 Miles Legend: _ _ Inferredcontact Note:TO converito kilometersmultiply by 1.609 to convetito metersmultiply by0.304e Figure 4-4a. Generalized geologic cross section from Fourmile Branch to L DO~IS-0268 I t" 1 I I t 4-8 DOE/EIS-0268 I 4-60 I t t i I I DOE/EIS-0268 ,. ,. 4-61 DOE/EIS-0268 ,. ,,.':, .. ,.. , 4-62 I 1 I I I DOE/EIS-0268 4-63 DOEI'EIS-0268 ., . . 4-64 I I 1 B I I I m 1 I I I I 1 I I I m I DOE~IS-0268 4-65 DO~IS-0268 Radon in homes: 200 millirem per year Notes me major contributor to the annual average individual dose in the United StaIeS, [ncluti"g residents of the Central Savannah River Area, is naturally occuning radiation

75

Apples and oranges: don't compare levelized cost of renewables: Joskow  

SciTech Connect

MIT Prof. Paul Joskow points out that the levelized metric is inappropriate for comparing intermittent generating technologies like wind and solar with dispatchable generating technologies like nuclear, gas combined cycle, and coal. The levelized comparison fails to take into account differences in the production profiles of intermittent and dispatchable generating technologies and the associated large variations in the market value of the electricity they supply. When the electricity is produced by an intermittent generating technology, the level of output and the value of the electricity at the times when the output is produced are key variables that should be taken into account.

NONE

2010-12-15T23:59:59.000Z

76

Microsoft Word - Figure_13.doc  

Annual Energy Outlook 2012 (EIA)

Gas Purchases and Deliveries to Consumers"; Federal Energy Regulatory Commission (FERC), Form FERC-423, "Monthly Report of Cost and Quality of Fuels for Electric Plants"; and...

77

Microsoft Word - figure_25.doc  

U.S. Energy Information Administration (EIA) Indexed Site

For DC and HI, Electric price is not applicable. Source: Federal Energy Regulatory Commission (FERC) Form 423, "Monthly Report of Cost and Quality of Fuels for Electric Plants."...

78

Cost-Effective Methods for Accurate Determination of Sea Level Rise Vulnerability: A Solomon Islands Example  

Science Conference Proceedings (OSTI)

For millions of people living along the coastal fringe, sea level rise is perhaps the greatest threat to livelihoods over the coming century. With the refinement and downscaling of global climate models and increasing availability of airborne-...

Simon Albert; Kirsten Abernethy; Badin Gibbes; Alistair Grinham; Nixon Tooler; Shankar Aswani

2013-10-01T23:59:59.000Z

79

Cost-Effective Methods for Accurate Determination of Sea Level Rise Vulnerability: A Solomon Islands Example  

Science Conference Proceedings (OSTI)

For millions of people living along the coastal fringe, sea level rise is perhaps the greatest threat to livelihoods over the coming century. With the refinement and downscaling of global climate models and increasing availability of airborne ...

Simon Albert; Kirsten Abernethy; Badin Gibbes; Alistair Grinham; Nixon Tooler; Shankar Aswani

80

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

penetration (Giebel 2005). Wind integration costs represent2005. Large Scale Integration of Wind Energy in the Europeanincreases in wind costs; Transmission and integration costs

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Coal-fired power-plant-capital-cost estimates. Final report. [Mid-1978 price level; 13 different sites  

Science Conference Proceedings (OSTI)

Conceptual designs and order-of-magnitude capital cost estimates have been prepared for typical 1000-MW coal-fired power plants. These subcritical plants will provide high efficiency in base load operation without excessive efficiency loss in cycling operation. In addition, an alternative supercritical design and a cost estimate were developed for each of the plants for maximum efficiency at 80 to 100% of design capacity. The power plants will be located in 13 representative regions of the United States and will be fueled by coal typically available in each region. In two locations, alternate coals are available and plants have been designed and estimated for both coals resulting in a total of 15 power plants. The capital cost estimates are at mid-1978 price level with no escalation and are based on the contractor's current construction projects. Conservative estimating parameters have been used to ensure their suitability as planning tools for utility companies. A flue gas desulfurization (FGD) system has been included for each plant to reflect the requirements of the promulgated New Source Performance Standards (NSPS) for sulfur dioxide (SO/sub 2/) emissions. The estimated costs of the FGD facilities range from 74 to 169 $/kW depending on the coal characteristics and the location of the plant. The estimated total capital requirements for twin 500-MW units vary from 8088 $/kW for a southeastern plant burning bituminous Kentucky coal to 990 $/kW for a remote western plant burning subbituminous Wyoming coal.

Holstein, R.A.

1981-05-01T23:59:59.000Z

82

Weighing the Costs and Benefits of Renewables Portfolio Standards:A Comparative Analysis of State-Level Policy Impact Projections  

SciTech Connect

State renewables portfolio standards (RPS) have emerged as one of the most important policy drivers of renewable energy capacity expansion in the U.S. Collectively, these policies now apply to roughly 40% of U.S. electricity load, and may have substantial impacts on electricity markets, ratepayers, and local economies. As RPS policies have been proposed or adopted in an increasing number of states, a growing number of studies have attempted to quantify the potential impacts of these policies, focusing primarily on projecting cost impacts, but sometimes also estimating macroeconomic and environmental effects. This report synthesizes and analyzes the results and methodologies of 28 distinct state or utility-level RPS cost impact analyses completed since 1998. Together, these studies model proposed or adopted RPS policies in 18 different states. We highlight the key findings of these studies on the costs and benefits of RPS policies, examine the sensitivity of projected costs to model assumptions, assess the attributes of different modeling approaches, and suggest possible areas of improvement for future RPS analysis.

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-16T23:59:59.000Z

83

Evaluation of I-10 Pomona (07-181304) Long-Life Pavement Rehabilitation Costs  

E-Print Network (OSTI)

the expenditures for these projects, costs were divided intofurnished materials. Project Cost Breakdown Original BidIndirect Costs Figure 1. Project cost breakdown based on

Harvey, John T; Santero, Nicholas J; G, Mary Fermo

2005-01-01T23:59:59.000Z

84

Microsoft Word - figure_24.doc  

Annual Energy Outlook 2012 (EIA)

in the 0.00-4.99 price category. Source: Federal Energy Regulatory Commission (FERC), Form FERC-423, "Monthly Report of Cost and Quality of Fuels for Electric Plants."...

85

Microsoft Word - figure_24.doc  

Gasoline and Diesel Fuel Update (EIA)

23) are included in the 0.00-4.99 price category. Source: Federal Energy Regulatory Commission (FERC) Form 423, "Monthly Report of Cost and Quality of Fuels for Electric Plants."...

86

Microsoft Word - figure_20.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 0 2 4 6 8 10 12 14 16 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 Sources: Nominal dollars: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-910, "Monthly Natural Gas Marketer Survey." Constant dollars: Prices were converted to 2005 dollars using the chain-type price indexes for Gross Domestic Product (2005 = 1.0) as published by the U.S. Department of Commerce, Bureau of Economic Analysis. dollars per thousand cubic feet base year Figure 21. Average price of natural gas delivered to residential consumers, 1980-2011 nominal dollars

87

Microsoft Word - figure_15.doc  

Gasoline and Diesel Fuel Update (EIA)

38 38 0 2 4 6 8 10 2002 2003 2004 2005 2006 Trillion Cubic Feet 0 50 100 150 200 250 Billion Cubic Meters Residential Commercial Industrial Electric Power Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-906, "Power Plant Report." Figure 15. Natural Gas Delivered to Consumers in the United States, 2002-2006 Cautionary Note: Number of Residential and Commercial Consumers The Energy Information Administration (EIA) expects that there may be some double counting in the number of residential and commercial customers reported for 2002 through 2006. EIA collects information on the number of residential and commercial consumers through a survey of companies that deliver gas

88

Microsoft Word - figure_13.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 13. Net Interstate Movements, Imports, and Exports of Natural Gas in the United States, 2007 (Million Cubic Feet) Nigeria Algeria 37,483 WA M T I D OR W Y ND SD C A N V UT CO NE KS AZ NM OK TX MN WI MI IA I L IN OH MO AR MS AL GA TN KY FL SC NC WV MD DE VA PA NJ NY CT RI MA VT NH ME LA HI AK Mexico C a n a d a C a n a d a Canada Canada Canada Canada Canada Algeria Canada Canada i i N g e r a Gulf of Mexico Gulf o f M e x i c o Gulf of Mexico Canada Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and the Office of Fossil Energy, Natural Gas Imports and Exports.

89

Microsoft Word - figure_15.doc  

Gasoline and Diesel Fuel Update (EIA)

0 0 0 2 4 6 8 10 2003 2004 2005 2006 2007 Trillion Cubic Feet 0 50 100 150 200 250 Billion Cubic Meters Residential Commercial Industrial Electric Power Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-906, "Power Plant Report"; Form EIA-920, "Combined Heat and Power Plant Report"; and Form EIA-923, "Power Plant Operations Report." Figure 15. Natural Gas Delivered to Consumers in the United States, 2003-2007 Cautionary Note: Number of Residential and Commercial Consumers The Energy Information Administration (EIA) expects that there may be some double counting in the number of residential and commercial customers reported for 2003 through 2007.

90

Microsoft Word - figure_15.doc  

Gasoline and Diesel Fuel Update (EIA)

38 38 0 2 4 6 8 10 2001 2002 2003 2004 2005 Trillion Cubic Feet 0 50 100 150 200 250 Billion Cubic Meters Residential Commercial Industrial Electric Power Figure 15. Natural Gas Delivered to Consumers in the United States, 2001-2005 Sources: Energy Information Administration (EIA), Form EIA -176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-906, "Power Plant Report." Cautionary Note: Number of Residential and Commercial Consumers The Energy Information Administration (EIA) expects that there may be some double counting in the number of residential and commercial customers reported for 2001 through 2005. EIA collects information on the number of residential and commercial consumers through a survey of companies that deliver gas

91

PHOBOS Experiment: Figures and Data  

DOE Data Explorer (OSTI)

PHOBOS consists of many silicon detectors surrounding the interaction region. With these detectors physicists can count the total number of produced particles and study the angular distributions of all the products. Physicists know from other branches of physics that a characteristic of phase transitions are fluctuations in physical observables. With the PHOBOS array they look for unusual events or fluctuations in the number of particles and angular distribution. The articles that have appeared in refereed science journals are listed here with separate links to the supporting data plots, figures, and tables of numeric data.  See also supporting data for articles in technical journals at http://www.phobos.bnl.gov/Publications/Technical/phobos_technical_publications.htm and from conference proceedings at http://www.phobos.bnl.gov/Publications/Proceedings/phobos_proceedings_publications.htm

The PHOBOS Collaboration

92

Figure SR4. U.S. Natural Gas Import & Export Prices, 2007-2008  

U.S. Energy Information Administration (EIA)

A run-up on natural gas prices began in the spring before a weakened economy drove prices below 2007 levels during the fall and winter. Figure Data:

93

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

45 7.3 Renewable Energy Costand future renewable energy costs, while less volatile thanResource Data Renewable Energy Cost Characterization

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

94

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

Energy Busbar Cost Data 47 Windanalysis. energy (wind, in particular), as well as the costwind capital cost estimates from EPRI/DOE Renewable Energy

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

95

Microsoft Word - figure_13.doc  

Gasoline and Diesel Fuel Update (EIA)

,833 ,833 35 Egypt Figure 13. Net Interstate Movements, Imports, and Exports of Natural Gas in the United States, 2009 (Million Cubic Feet) Norway Trinidad/ Tobago Trinidad/ Tobago Egypt Interstate Movements Not Shown on Map From Volume To From Volume To CT RI RI MA MA CT VA DC MD DC 111,144 WA M T I D OR W Y ND SD C A N V UT CO NE KS AZ NM OK TX MN WI MI IA I L IN OH MO AR MS AL GA TN KY FL SC NC WV MD DE VA PA NJ NY CT RI MA VT NH ME LA HI AK Mexico C a n a d a C a n a d a Canada Canada Canada Canada Canada Canada Canada i i N g e r a Gulf of Mexico Gulf o f M e x i c o Gulf of Mexico Canada Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," the Office of Fossil Energy, Natural Gas Imports and Exports, and EIA estimates

96

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 2. Natural Gas Supply and Disposition in the United States, 2010 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 26.8 0.8 0.2 3.4 3.280 0.190 0.042 0.333 0.739 0.033 21.3 1.1 3.3 3.3 2.0 3.1 6.5 0.03 7.4 0.073 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to

97

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 2. Natural Gas Supply and Disposition in the United States, 2009 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 26.0 0.7 0.2 3.5 3.271 0.236 0.013 0.338 0.701 0.031 20.6 1.0 3.4 3.0 1.9 3.1 6.2 0.03 6.9 0.160 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to

98

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Algeria Figure 2. Natural Gas Supply and Disposition in the United States, 2007 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 24.6 0.6 0.2 3.8 3.783 0.448 0.077 0.095 0.292 0.482 0.047 19.1 0.9 3.2 3.4 1.8 3.0 6.6 0.03 6.8 0.115 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895A, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to

99

Microsoft Word - figure_14.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 14. Net Interstate Movements, Imports, and Exports of Natural Gas in the United States, 2010 (Million Cubic Feet) Norway India Trinidad/ Tobago Egypt Yemen Japan Interstate Movements Not Shown on Map From Volume To From Volume To CT RI RI MA MA CT VA DC MD DC 53,122 WA M T I D OR W Y ND SD C A N V UT CO NE KS AZ NM OK TX MN WI MI IA I L IN OH MO AR MS AL GA TN KY FL SC NC WV MD DE VA PA NJ NY CT RI MA VT NH ME LA HI AK Mexico C a n a d a C a n a d a Canada Canada Canada Canada Canada Canada Canada Gulf of Mexico Canada Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," the Office of Fossil Energy, Natural Gas Imports and Exports, and EIA estimates based on historical data. Energy Information

100

Microsoft Word - figure_16.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 Commercial All Other States Wisconsin Minnesota Pennsylvania Texas Ohio New Jersey Michigan California New York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Residential Wisconsin Indiana Texas New Jersey Pennsylvania Ohio Michigan Illinois California All Other States New York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Figure 16. Natural Gas Delivered to Consumers in the United States, 2008 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet Electric Pow er 6,668,379 31% Industrial 6,650,276 31% Commercial 3,135,852 15% Residential 4,872,107 23% Industrial All Other States Georgia Iow a Oklahom a Pennsylvania Illinois Indiana Ohio Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Electric Power All Other States Mississippi New Jersey Louisiana

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Microsoft Word - figure_17.doc  

Gasoline and Diesel Fuel Update (EIA)

3 3 Commercial All Other States Wisconsin M innesota Pennsylvania Ohio M ichigan Texas New Jersey California New York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion C ubic Feet Residential Colorado Indiana Texas New Jersey Pennsylvania Ohio M ichigan Illinois California All Other States New York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion C ubic Feet Figure 18. Natural gas delivered to consumers in the United States, 2011 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet Residential 4,713,695 21% Commercial 3,153,605 14% Industrial 6,904,843 31% Electric Power 7,573,863 34% Industrial All Other States M innesota Iowa Oklahoma Pennsylvania Ohio Illinois Indiana Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Electric Power

102

Microsoft Word - figure_16.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 Commercial All Other States Wisconsin Minnesota Pennsylvania Ohio Texas Michigan New Jersey California New York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Residential Wisconsin Indiana Texas New Jersey Pennsylvania Ohio Michigan Illinois California All Other States New York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Figure 16. Natural Gas Delivered to Consumers in the United States, 2007 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet Electric Pow er 6,841,408 33% Industrial 6,624,846 31% Commercial 3,017,105 14% Residential 4,717,311 22% Industrial All Other States Georgia Oklahom a Michigan Pennsylvania Illinois Indiana Ohio Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Electric Power All Other States Alabam a

103

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 2. Natural Gas Supply and Disposition in the United States, 20088 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 25.8 0.7 0.2 3.6 3.589 0.267 0.012 0.365 0.590 0.050 20.3 1.0 3.4 3.4 1.9 3.1 6.7 0.03 6.7 0.055 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-914, "Monthly Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to

104

Microsoft Word - figure_02.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 Egypt Algeria Figure 2. Natural Gas Supply and Disposition in the United States, 2006 (Trillion Cubic Feet) Extraction Loss Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Nigeria Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 23.5 0.7 0.1 3.3 3.590 0.389 0.017 0.057 0.322 0.341 0.061 18.5 0.9 3.0 2.5 1.7 4.4 2.8 6.5 0.02 6.2 0.120 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895A, "Annual Quantity and Value of Natural Gas Production Report"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers"; Form EIA-816, "Monthly Natural Gas Liquids

105

Microsoft Word - figure_13.doc  

Gasoline and Diesel Fuel Update (EIA)

Egypt Figure 13. Net Interstate Movements, Imports, and Exports of Natural Gas in the United States, 2008 (Million Cubic Feet) Norway Trinidad/ Tobago Interstate Movements Not Shown on Map From Volume To From Volume To CT RI RI MA MA CT VA DC MD DC 45,772 WA M T I D OR W Y ND SD C A N V UT CO NE KS AZ NM OK TX MN WI MI IA I L IN OH MO AR MS AL GA TN KY FL SC NC WV MD DE VA PA NJ NY CT RI MA VT NH ME LA HI AK Mexico C a n a d a C a n a d a Canada Canada Canada Canada Canada Canada Canada i i N g e r a Gulf of Mexico Gulf o f M e x i c o Gulf of Mexico Canada Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," the Office of Fossil Energy, Natural Gas Imports and Exports, and EIA estimates.

106

Microsoft Word - figure_16.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 Commercial All Other States Wisconsin Minnesota Pennsylvania Ohio Michigan Texas New Jersey California New York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Residential Minnesota Indiana Texas New Jersey Pennsylvania Ohio Michigan Illinois California All Other States New York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion Cubic Feet Figure 16. Natural Gas Delivered to Consumers in the United States, 2009 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet Electric Pow er 6,872,049 33% Industrial 6,167,193 29% Commercial 3,118,833 15% Residential 4,778,478 23% Industrial All Other States Georgia Iow a Pennsylvania Oklahom a Ohio Illinois Indiana Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Electric Power All Other States Nevada Pennsylvania Alabam a Arizona

107

Microsoft Word - figure_17.doc  

Gasoline and Diesel Fuel Update (EIA)

5 5 C ommercial All O ther States W isconsin Minnesota Pennsylvania Michigan O hio N ew Jersey Texas California N ew York Illinois 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion C ubic Feet Residential Indiana G eorgia N ew Jersey Pennsylvania Texas O hio Michigan Illinois California All O ther States N ew York 0.0 0.5 1.0 1.5 2.0 2.5 3.0 Trillion C ubic Feet Figure 17. Natural Gas Delivered to Consumers in the United States, 2010 Volumes in Million Cubic Feet Trillion Cubic Feet Trillion Cubic Feet E lectric P ower 7,387,184 34% Industrial 6,517,477 30% C om m ercial 3,101,675 14% R esidential 4,787,320 22% Industrial All O ther States Minnesota Iowa Pennsylvania O klahoma Illinois O hio Indiana Louisiana Texas California 0.0 0.5 1.0 1.5 2.0 2.5 3.0 E lectric Power All O ther States Arizona Mississippi Louisiana Alabama

108

Microsoft Word - figure_19.doc  

Gasoline and Diesel Fuel Update (EIA)

63 63 0 2 4 6 8 10 12 14 16 2007 2008 2009 2010 2011 Residential Commercial Industrial Electric Power Vehicle Fuel Notes: Coverage for prices varies by consumer sector. Prices are in nominal dollars. See Appendix A for further discussion on consumer prices. Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers"; Federal Energy Regulatory Commission (FERC) Form 423, "Monthly Report of Cost and Quality of Fuels for Electric Plants"; Form EIA-423, "Monthly Cost and Quality of Fuels for Electric Plants Report"; Form EIA-923, "Power Plant Operations Report"; and Form EIA-910, "Monthly Natural Gas Marketer

109

Energy Efficiency Report: Chapter 3 Figures (Residential)  

U.S. Energy Information Administration (EIA)

Figure 3.1. Total Site Residential Energy Consumption and Personal Consumption Expenditures Indices, 1980 to 1993. Notes: Personal consumption expenditures used ...

110

Figure 70. Delivered energy consumption for transportation ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 70. Delivered energy consumption for transportation by mode, 2011 and 2040 (quadrillion Btu) Total Rail Pipeline Marine ...

111

Figure 37. Carbon dioxide emissions from electricity ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 37. Carbon dioxide emissions from electricity generation in three cases, 2005-2040 (million metric tons carbon dioxide ...

112

Figure F2. Electricity market module regions  

U.S. Energy Information Administration (EIA)

U.S. Energy Information Administration Annual Energy Outlook 2013 227 Regional maps Figure F2. Electricity market module regions Source: U.S. Energy Information ...

113

Figure 4.17 Geothermal Resources  

U.S. Energy Information Administration (EIA)

Figure 4.17 Geothermal Resources 124 U.S. Energy Information Administration / Annual Energy Review 2011 Notes: • Data are for locations of identified hydrothermal ...

114

Microsoft Word - figure_18.doc  

Gasoline and Diesel Fuel Update (EIA)

2 2 0 2 4 6 8 10 12 14 16 2005 2006 2007 2008 2009 0 40 80 120 160 200 240 280 320 360 400 440 Residential Commercial Industrial Electric Power Vehicle Fuel 0 2 4 6 8 1 0 1 2 1 4 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 Notes: Coverage for prices varies by consumer sector. Prices are in nominal dollars. See Appendix A for further discussion on consumer prices. Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers"; Federal Energy Regulatory Commission (FERC) Form 423, "Monthly Report of Cost and Quality of Fuels for Electric Plants"; Form EIA-423, "Monthly Cost and Quality of Fuels for Electric Plants Report"; Form EIA-923, "Power Plant Operations Report"; and Form EIA-910, "Monthly Natural Gas

115

Microsoft Word - figure_19.doc  

Gasoline and Diesel Fuel Update (EIA)

4 4 0 2 4 6 8 10 12 14 16 2006 2007 2008 2009 2010 0 40 80 120 160 200 240 280 320 360 400 440 Residential Commercial Industrial Electric Power V ehicle Fuel 0 2 4 6 8 1 0 1 2 1 4 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 Notes: Coverage for prices varies by consumer sector. Prices are in nominal dollars. See Appendix A for further discussion on consumer prices. Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers"; Federal Energy Regulatory Commission (FERC) Form 423, "Monthly Report of Cost and Quality of Fuels for Electric Plants"; Form EIA-423, "Monthly Cost and Quality of Fuels for Electric Plants Report"; Form EIA-923, "Power Plant Operations Report"; and Form EIA-910, "Monthly Natural Gas

116

Microsoft Word - figure_18.doc  

Gasoline and Diesel Fuel Update (EIA)

0 0 0 2 4 6 8 10 12 14 16 2003 2004 2005 2006 2007 Nominal Dollars per Thousand Cubic Feet 0 40 80 120 160 200 240 280 320 360 400 440 Nominal Dollars per Thousand Cubic Meters Residential Commercial Industrial Electric Power Vehicle Fuel 0 2 4 6 8 1 0 1 2 1 4 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 Note: Coverage for prices varies by consumer sector. See Appendix A for further discussion on consumer prices. Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers"; Federal Energy Regulatory Commission (FERC) Form 423, "Monthly Report of Cost and Quality of Fuels for Electric Plants"; Form EIA-423, "Monthly Cost and Quality of Fuels for Electric Plants Report"; Form EIA-923, "Power Plant Operations Report"; and Form EIA-910, "Monthly Natural Gas

117

Level  

E-Print Network (OSTI)

7 at level 3 (FHEQ level 6) and the rest at level M (FHEQ level 7) 4. Other entry N/A Credit Level awards (if applicable): 5. Exit Awards: PGDip Advanced Computer Science 120 credits with not more than 30 credits at level 3 (FHEQ level 6) and the rest at level M (FHEQ level 7) Credit

Programme Csad

2007-01-01T23:59:59.000Z

118

Level  

E-Print Network (OSTI)

7 at level 3 (FHEQ level 6) and the rest at level M (FHEQ level 7) 4. Other entry N/A Credit Level awards (if applicable): 5. Exit Awards: PGDip Computer Science 120 credits with not more than 30 credits at level 3 (FHEQ level 6) and the rest at level M (FHEQ level 7) Credit

unknown authors

2006-01-01T23:59:59.000Z

119

Microsoft Word - figure_18.doc  

Gasoline and Diesel Fuel Update (EIA)

0 0 0 2 4 6 8 10 12 14 16 2002 2003 2004 2005 2006 Dollars per Thousand Cubic Feet 0 40 80 120 160 200 240 280 320 360 400 440 Dollars per Thousand Cubic Meters Residential Commercial Industrial Electric Power Vehicle Fuel 0 2 4 6 8 1 0 1 2 1 4 2 0 0 1 2 0 0 2 2 0 0 3 2 0 0 4 2 0 0 5 Note: Coverage for prices varies by consumer sector. See Appendix A for further discussion on consumer prices. Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-857, "Monthly Report of Natural Gas Purchases and Deliveries to Consumers"; Federal Energy Regulatory Commission (FERC) Form 423, "Monthly Report of Cost and Quality of Fuels for Electric Plants"; and Form EIA-910, "Monthly Natural Gas Marketer Survey."

120

Development of high-efficiency silicon solar cells and modeling the impact of system parameters on levelized cost of electricity .  

E-Print Network (OSTI)

??The objective of this thesis is to develop low-cost high-efficiency crystalline silicon solar cells which are at the right intersection of cost and performance to… (more)

Kang, Moon Hee

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Environmental benefits and cost savings through market-based instruments : an application using state-level data from India  

E-Print Network (OSTI)

This paper develops a methodology for estimating potential cost savings from the use of market-based instruments (MBIs) when local emissions and abatement cost data are not available. The paper provides estimates of the ...

Gupta, Shreekant

2002-01-01T23:59:59.000Z

122

Integrating Volume Reduction and Packaging Alternatives to Achieve Cost Savings for Low Level Waste Disposal at the Rocky Flats Environmental Technology Site  

Science Conference Proceedings (OSTI)

In order to reduce costs and achieve schedules for Closure of the Rocky Flats Environmental Technology Site (RFETS), the Waste Requirements Group has implemented a number of cost saving initiatives aimed at integrating waste volume reduction with the selection of compliant waste packaging methods for the disposal of RFETS low level radioactive waste (LLW). Waste Guidance Inventory and Shipping Forecasts indicate that over 200,000 m3 of low level waste will be shipped offsite between FY2002 and FY2006. Current projections indicate that the majority of this waste will be shipped offsite in an estimated 40,000 55-gallon drums, 10,000 metal and plywood boxes, and 5000 cargo containers. Currently, the projected cost for packaging, shipment, and disposal adds up to $80 million. With these waste volume and cost projections, the need for more efficient and cost effective packaging and transportation options were apparent in order to reduce costs and achieve future Site packaging a nd transportation needs. This paper presents some of the cost saving initiatives being implemented for waste packaging at the Rocky Flats Environmental Technology Site (the Site). There are many options for either volume reduction or alternative packaging. Each building and/or project may indicate different preferences and/or combinations of options.

Church, A.; Gordon, J.; Montrose, J. K.

2002-02-26T23:59:59.000Z

123

Microsoft Word - Figure_03_04.doc  

U.S. Energy Information Administration (EIA) Indexed Site

8 8 0 2 4 6 8 10 12 14 16 18 20 22 2010 2011 2012 2013 2014 Residential Commercial Industrial Electric Power Citygate dollars per thousand cubic feet Figure 3 and 4 0 2 4 6 8 10 12 14 16 18 20 22 2010 2011 2012 2013 2014 NGPL Composite Spot Price NG Spot Price at Henry Hub dollars per thousand c ubic feet Note: Prices are in nominal dollars. Source: Table 3. Figure 3. Average citygate and consumer prices of natural gas in the United States, 2010-2013 Figure 4. Spot prices of natural gas and natural gas plant liquids in the United States, 2010-2013

124

Kaganovich et al Supplementary Figure S1  

E-Print Network (OSTI)

n n Kaganovich et al Supplementary Figure S1 WT+MG13237°Ccim3-1 Ubc9 ts Ubc9 ts 37°C a b n n cim3 al Supplementary Figure S2 c b ts cim3-1 (min): 0 5 10 15 60 60 GFP-Ubc9 + 20M Benomyltime at 37 °C Figure S3 GFP-VHL T S P T S P 30°C 37°C 1hr Ub-GFP Sup-Pellet assay cim3-1 GFP-VHL a b VHL in cim3

Bedwell, David M.

125

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

on Average Retail Electricity Rates.. 14Projected RPS Electricity Rate Impacts by RPS CostRPS Targets and Retail Electricity Rate Impacts 16 Typical

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

126

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

An Overview of Alternative Fossil Fuel Price and Carbonof renewable technology cost, fossil fuel price uncertainty,energy, including the fossil fuel hedge value of renewable

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

127

Levelized life-cycle costs for four residue-collection systems and four gas-production systems  

DOE Green Energy (OSTI)

Technology characterizations and life-cycle costs were obtained for four residue-collection systems and four gas-production systems. All costs are in constant 1981 dollars. The residue-collection systems were cornstover collection, wheat-straw collection, soybean-residue collection, and wood chips from forest residue. The life-cycle costs ranged from $19/ton for cornstover collection to $56/ton for wood chips from forest residues. The gas-production systems were low-Btu gas from a farm-size gasifier, solar flash pyrolysis of biomass, methane from seaweed farms, and hydrogen production from bacteria. Life-cycle costs ranged from $3.3/10/sup 6/ Btu for solar flash pyrolysis of biomass to $9.6/10/sup 6/ Btu for hydrogen from bacteria. Sensitivity studies were also performed for each system. The sensitivity studies indicated that fertilizer replacement costs were the dominate costs for the farm-residue collection, while residue yield was most important for the wood residue. Feedstock costs were most important for the flash pyrolysis. Yields and capital costs are most important for the seaweed farm and the hydrogen from bacteria system.

Thayer, G.R.; Rood, P.L.; Williamson, K.D. Jr.; Rollett, H.

1983-01-01T23:59:59.000Z

128

Figure ES1. Map of Northern Alaska  

U.S. Energy Information Administration (EIA) Indexed Site

Figure ES1. Map of Northern Alaska figurees1.jpg (61418 bytes) Source: Edited from U.S. Geological Survey, "The Oil and Gas Resource Potential of the Arctic National Wildlife...

129

arXiv.org help - Bitmapping Figures  

NLE Websites -- All DOE Office Websites (Extended Search)

Bitmapping Figures Many graphics and plotting programs do not take into account that people might want to send their output over the internet instead of to a local printer. These...

130

Microsoft Word - figure_08_2008.doc  

Annual Energy Outlook 2012 (EIA)

9 48.5 Egypt Japan Canada Mexico Figure 8. Flow of Natural Gas Imports and Exports, 2007 (Billion Cubic Feet) Note: U.S. exports to Canada and Mexico include liquefied natural gas...

131

Microsoft Word - Figure_8_Oct2009.doc  

Gasoline and Diesel Fuel Update (EIA)

19 50 Japan Canada Mexico Figure 8. Flow of Natural Gas Imports and Exports, 2008 (Billion Cubic Feet) Note: U.S. exports to Canada and Mexico include liquefied natural gas (LNG)....

132

Level  

E-Print Network (OSTI)

7 180 credits with not more than 30 credits at level 3 (FHEQ level 6) and the rest at level M (FHEQ level 7) 4. Other entry N/A Credit Level awards (if applicable): 5. Exit Awards: PGDip in Advanced Computer Science with

Programme Csci

2010-01-01T23:59:59.000Z

133

Keywords: Photovoltaic System, fault-tolerance, recon-figurable PV panel  

E-Print Network (OSTI)

1 Keywords: Photovoltaic System, fault-tolerance, recon- figurable PV panel Photovoltaic (PV plants, and satellites. The output power of a PV cell (also called solar cell) is dependent on the solar irradiance level and temperature. Figure 1 shows PV cell output current-voltage and power

Pedram, Massoud

134

Weighing the Costs and Benefits of Renewables Portfolio Standards: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

versus out-of-state renewable energy project development andbarriers to renewable energy in many states, but these costsPV technology or renewable energy generated in-state. For an

Chen, Cliff; Wiser, Ryan; Bolinger, Mark

2007-01-01T23:59:59.000Z

135

Types of Costs Types of Cost Estimates  

E-Print Network (OSTI)

05-1 · Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408) costs apply to those items that are consumed in production process and are roughly proportional to level in cash flow analysis and in the decision to use the equipment for reclamation? Types of Costs #12

Boisvert, Jeff

136

Wet-Etch Figuring Optical Figuring by Controlled Application of Liquid Etchant  

SciTech Connect

WET-ETCH FIGURING (WEF) is an automated method of precisely figuring optical materials by the controlled application of aqueous etchant solution. This technology uses surface-tension-gradient-driven flow to confine and stabilize a wetted zone of an etchant solution or other aqueous processing fluid on the surface of an object. This wetted zone can be translated on the surface in a computer-controlled fashion for precise spatial control of the surface reactions occurring (e.g. chemical etching). WEF is particularly suitable for figuring very thin optical materials because it applies no thermal or mechanical stress to the material. Also, because the process is stress-free the workpiece can be monitored during figuring using interferometric metrology, and the measurements obtained can be used to control the figuring process in real-time--something that cannot be done with traditional figuring methods.

Britten, J

2001-02-13T23:59:59.000Z

137

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

Science Conference Proceedings (OSTI)

State renewables portfolio standards (RPS) have emerged as one of the most important policy drivers of renewable energy capacity expansion in the U.S. As RPS policies have been proposed or adopted in an increasing number of states, a growing number of studies have attempted to quantify the potential impacts of these policies, focusing primarily on cost impacts, but sometimes also estimating macroeconomic, risk reduction, and environmental effects. This article synthesizes and analyzes the results and methodologies of 31 distinct state or utility-level RPS cost-impact analyses completed since 1998. Together, these studies model proposed or adopted RPS policies in 20 different states. We highlight the key findings of these studies on the projected costs of state RPS policies, examine the sensitivity of projected costs to model assumptions, evaluate the reasonableness of key input assumptions, and suggest possible areas of improvement for future RPS analyses. We conclude that while there is considerable uncertainty in the study results, the majority of the studies project modest cost impacts. Seventy percent of the state RPS cost studies project retail electricity rate increases of no greater than one percent. Nonetheless, there is considerable room for improving the analytic methods, and therefore accuracy, of these estimates.

Chen, Cliff; Wiser, Ryan; Mills, Andrew; Bolinger, Mark

2008-01-07T23:59:59.000Z

138

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

and future renewable energy costs, while less volatile thandifference between renewable energy costs and the cost ofto be the least-cost renewable energy source and, as noted

Chen, Cliff

2009-01-01T23:59:59.000Z

139

Figure 111. Energy-related carbon dioxide emissions in three cases ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 111. Energy-related carbon dioxide emissions in three cases with three levels of emissions fees, 2000-2040 (million metric tons)

140

EIS-0317-S1: Environmental Impact Statement, Maps and Figures...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Impact Statement, Maps and Figures Kangley-Echo Lake Transmission Line Project Maps and Figures Bonneville Power Administration is proposing to build a new...

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Sheet Metal Forming: A Review - Figure 18 - TMS  

Science Conference Proceedings (OSTI)

Figure 18. Fracture and local necking strains in aluminum alloy 5154. Under balanced biaxial tension, failure occurs by fracture before local necking. Figure 18 ...

142

Figure 2. Energy Consumption of Vehicles, Selected Survey Years  

U.S. Energy Information Administration (EIA) Indexed Site

Home > Households, Buildings & Industry >Transportation Surveys > Household Vehicles Energy Use > Figure 2 Figure 2. Energy Consumption of Vehicles, Selected Survey Years...

143

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

and (2) monthly electricity bill impacts for a typicalinfluence consumer electricity bills. Some benefits thatconsumer’s monthly electricity bill. Figure presents

Chen, Cliff

2009-01-01T23:59:59.000Z

144

Report on Waste Burial Charges Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities  

E-Print Network (OSTI)

was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, or any of their employees, make any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party’s use or the results of such use, of any information, apparatus, product or process disclosed in this report, or represents that its use by such third party would not infringe privately owned rights. The views expressed in this paper are not necessarily those of the U.S. Nuclear Regulatory Commission. NUREG-1307, Revision 13, is not a substitute for NRC regulations, and compliance is not required. The approaches and/or methods described in this NUREG are provided for information only. Publication of this report does not necessarily A requirement placed upon nuclear power reactor licensees by the U.S. Nuclear Regulatory Commission (NRC) is that licensees must annually adjust the estimate of the cost of decommissioning their plants, in dollars of the current year, as part of the process to provide reasonable assurance that adequate funds for decommissioning will be available when needed. This report, which is revised periodically, explains the formula that is acceptable to the NRC for determining the minimum decommissioning fund requirements for nuclear power plants. The sources of information used in the formula are identified, and the values developed for the estimation of radioactive waste burial/disposition costs, by site and by year, are given. Licensees may use the formula, coefficients, and burial/disposition adjustment factors from this report in their cost analyses,

unknown authors

2008-01-01T23:59:59.000Z

145

Microsoft Word - Figure_14_15.doc  

Gasoline and Diesel Fuel Update (EIA)

44 0 2 4 6 8 10 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 Dollars per Thousand Cubic Feet 0 40 80 120 160 200 240 280 320 Dollars per Thousand Cubic Meters Constant Dollars Nominal Dollars Figure 14. Average Price of Natural Gas Delivered to Residential Consumers, 1980-2002 Figure 15. Average City Gate Price of Natural Gas in the United States, 2002 (Dollars per Thousand Cubic Feet) Sources: Nominal dollars: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-910, "Monthly Natural Gas Marketer Survey." Constant dollars: Prices were converted to 2002 dollars using the chain-type price indexes for Gross Domestic Product (1996 = 1.0) as published by the U.S. Department of Commerce, Bureau of Economic Analysis.

146

Figure and finish of grazing incidence mirrors  

SciTech Connect

Great improvement has been made in the past several years in the quality of optical components used in synchrotron radiation (SR) beamlines. Most of this progress has been the result of vastly improved metrology techniques and instrumentation permitting rapid and accurate measurement of the surface finish and figure on grazing incidence optics. A significant theoretical effort has linked the actual performance of components used as x-ray wavelengths to their topological properties as measured by surface profiling instruments. Next-generation advanced light sources will require optical components and systems to have sub-arc second surface figure tolerances. This paper will explore the consequences of these requirements in terms of manufacturing tolerances to see if the present manufacturing state-of-the-art is capable of producing the required surfaces. 15 refs., 14 figs., 2 tabs.

Takacs, P.Z. (Brookhaven National Lab., Upton, NY (USA)); Church, E.L. (Picatinny Arsenal, Dover, NJ (USA). Army Armament Research, Development and Engineering Center)

1989-08-01T23:59:59.000Z

147

Figure correction of multilayer coated optics  

DOE Patents (OSTI)

A process is provided for producing near-perfect optical surfaces, for EUV and soft-x-ray optics. The method involves polishing or otherwise figuring the multilayer coating that has been deposited on an optical substrate, in order to correct for errors in the figure of the substrate and coating. A method such as ion-beam milling is used to remove material from the multilayer coating by an amount that varies in a specified way across the substrate. The phase of the EUV light that is reflected from the multilayer will be affected by the amount of multilayer material removed, but this effect will be reduced by a factor of 1-n as compared with height variations of the substrate, where n is the average refractive index of the multilayer.

Chapman; Henry N. (Livermore, CA), Taylor; John S. (Livermore, CA)

2010-02-16T23:59:59.000Z

148

Feasibility of Achieving a Zero-Net-Energy, Zero-Net-Cost Homes  

E-Print Network (OSTI)

DOE).   12 Sep 2005.  "EERE Consumer's Guide: Sizing and Renewable Energy (EERE), which made the following generation costs.   Figure 16: EERE Forecasted Cost of PV 

Al-Beaini, S.

2010-01-01T23:59:59.000Z

149

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

2005. Large Scale Integration of Wind Energy in the Europeanincreases in wind costs; Transmission and integration costs

Chen, Cliff

2009-01-01T23:59:59.000Z

150

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

Cost Study Report II. Albany, New York: New York DepartmentOrder Cost Analysis. Albany, New York: New York Public

Chen, Cliff

2009-01-01T23:59:59.000Z

151

Wind Power: How Much, How Soon, and At What Cost?  

E-Print Network (OSTI)

2007. "Utility Wind Integration and Operating Impact Statethat the integration of 20% wind into US electricity marketsand integration costs, Figure 8 provides a supply curve for wind

Wiser, Ryan H

2010-01-01T23:59:59.000Z

152

Short-Term Energy Outlook Figures  

U.S. Energy Information Administration (EIA) Indexed Site

Independent Statistics & Analysis" Independent Statistics & Analysis" ,"U.S. Energy Information Administration" ,"Short-Term Energy Outlook Figures, December 2013" ,"U.S. Prices" ,,"West Texas Intermediate (WTI) Crude Oil Price" ,,"U.S. Gasoline and Crude Oil Prices" ,,"U.S. Diesel Fuel and Crude Oil Prices" ,,"Henry Hub Natural Gas Price" ,,"U.S. Natural Gas Prices" ,"World Liquid Fuels" ,,"World Liquid Fuels Production and Consumption Balance" ,,"Estimated Unplanned Crude Oil Production Outages Among OPEC Producers" ,,"Estimated Unplanned Crude Oil Production Disruptions Among non-OPEC Producers" ,,"World Liquid Fuels Consumption" ,,"World Liquid Fuels Consumption Growth"

153

Microsoft Word - Figure_18_19.doc  

Gasoline and Diesel Fuel Update (EIA)

9 9 0.00-2.49 2.50-4.49 4.50-6.49 6.50-8.49 8.50-10.49 10.50+ WA ID MT OR CA NV UT AZ NM CO WY ND SD MN WI NE IA KS MO TX IL IN OH MI OK AR TN WV VA KY PA WI NY VT NH MA CT ME RI NJ DE DC NC SC GA AL MS LA FL HI AK MD 0.00-2.49 2.50-4.49 4.50-6.49 6.50-8.49 8.50-10.49 10.50+ WA ID MT OR CA NV UT AZ NM CO WY ND SD MN WI NE IA KS MO TX IL IN OH MI OK AR TN WV VA KY MD PA WI NY VT NH MA CT ME RI NJ DE DC NC SC GA AL MS LA FL HI AK Figure 18. Average Price of Natural Gas Delivered to U.S. Onsystem Industrial Consumers, 2004 (Dollars per Thousand Cubic Feet) Figure 19. Average Price of Natural Gas Delivered to U.S. Electric Power Consumers, 2004 (Dollars per Thousand Cubic Feet) Source: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition." Note: States where the electric power price has been withheld (see Table 23) are included in the $0.00-$2.49 price category.

154

Microsoft Word - Figure_14_15.doc  

Gasoline and Diesel Fuel Update (EIA)

5 5 0.00-2.49 2.50-4.49 4.50-6.49 6.50-8.49 8.50-10.49 10.50+ WA ID MT OR CA NV UT AZ NM CO WY ND SD MN WI NE IA KS MO TX IL IN OH MI OK AR TN WV VA KY MD PA WI NY VT NH MA CT ME RI NJ DC NC SC GA AL MS LA FL HI AK DE 0 2 4 6 8 10 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 Dollars per Thousand Cubic Feet 0 40 80 120 160 200 240 280 320 360 Dollars per Thousand Cubic Meters Constant Dollars Nominal Dollars Figure 14. Average Price of Natural Gas Delivered to Residential Consumers, 1980-2004 Figure 15. Average City Gate Price of Natural Gas in the United States, 2004 (Dollars per Thousand Cubic Feet) Sources: Nominal dollars: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition," and Form EIA-910, "Monthly Natural Gas Marketer Survey." Constant dollars: Prices were converted to 2004 dollars using the chain-type price indexes for Gross Domestic Product

155

Regional comparison of nuclear and fossil electric power generation costs  

SciTech Connect

Nuclear's main disadvantages are its high capital investment cost and uncertainty in schedule compared with alternatives. Nuclear plant costs continue to rise whereas coal plant investment costs are staying relative steady. Based on average experience, nuclear capital investment costs are nearly double those of coal-fired generation plants. The capital investment cost disadvantage of nuclear is balanced by its fuel cost advantages. New base load nuclear power plants were projected to be competitive with coal-fired plants in most regions of the country. Nuclear power costs wre projected to be significantly less (10% or more) than coal-fired power costs in the South Atlantic region. Coal-fired plants were projected to have a significant economic advantage over nuclear plants in the Central and North Central regions. In the remaining seven regions, the levelized cost of power from either option was projected to be within 10%. Uncertainties in future costs of materials, services, and financing affect the relative economics of the nuclear and coal options significantly. 10 figures.

Bowers, H.I.

1984-01-01T23:59:59.000Z

156

Life-Cycle Cost and Risk Analysis of Alternative Configurations for Shipping Low-Level Radioactive Waste to the Nevada Test Site  

SciTech Connect

The Nevada Test Site (NTS) is a major receiver of low-level radioactive waste (LLW) for disposal. Currently, all LLW received at NTS is shipped by truck. The trucks use highway routes to NTS that pass through the Las Vegas Valley and over Hoover Dam, which is a concern of local stakeholder groups in the State of Nevada. Rail service offers the opportunity to reduce transportation risks and costs, according to the Waste Management Programmatic Environmental Impact Statement (WM-PEIS). However, NTS and some DOE LLW generator sites are not served with direct rail service so intermodal transport is under consideration. Intermodal transport involves transport via two modes, in this case truck and rail, from the generator sites to NTS. LLW shipping containers would be transferred between trucks and railcars at intermodal transfer points near the LLW generator sites, NTS, or both. An Environmental Assessment (EA)for Intermodal Transportation of Low-Level Radioactive Waste to the Nevada Test Site (referred to as the NTSIntermodal -M) has been prepared to determine whether there are environmental impacts to alterations to the current truck routing or use of intermodal facilities within the State of Nevada. However, an analysis of the potential impacts outside the State of Nevada are not addressed in the NTS Intermodal EA. This study examines the rest of the transportation network between LLW generator sites and the NTS and evaluates the costs, risks, and feasibility of integrating intermodal shipments into the LLW transportation system. This study evaluates alternative transportation system configurations for NTS approved and potential generators based on complex-wide LLW load information. Technical judgments relative to the availability of DOE LLW generators to ship from their sites by rail were developed. Public and worker risk and life-cycle cost components are quantified. The study identifies and evaluates alternative scenarios that increase the use of rail (intermodal where needed) to transport LLW from generator sites to NTS.

PM Daling; SB Ross; BM Biwer

1999-12-17T23:59:59.000Z

157

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

Cost Assumptions Wind power is often found to be the least-cost renewable energycost studies. The capacity value of renewable energy (wind,wind costs persist. Natural Gas Price Forecasts The difference between renewable energy

Chen, Cliff

2009-01-01T23:59:59.000Z

158

Microsoft Word - Figure_3_4.doc  

Gasoline and Diesel Fuel Update (EIA)

7 7 None 1-15,000 15,001-100,000 100,001-200,000 200,001-500,000 500,001-and over WA ID MT OR CA NV UT AZ NM CO WY ND SD MN WI NE IA KS MO TX IL IN OH MI OK AR TN WV VA KY MD PA WI NY VT NH MA CT ME RI NJ DE DC NC SC GA AL MS LA FL HI AK GOM 0 1 2 3 4 5 6 7 T e x a s G u l f o f M e x i c o N e w M e x i c o O k l a h o m a W y o m i n g L o u i s i a n a C o l o r a d o A l a s k a K a n s a s A l a b a m a A l l O t h e r S t a t e s Trillion Cubic Feet 0 30 60 90 120 150 180 Billion Cubic Meters 2002 2003 2002 Figure 4. Marketed Production of Natural Gas in Selected States and the Gulf of Mexico, 2002-2003 Figure 3. Marketed Production of Natural Gas in the United States and the Gulf of Mexico, 2003 (Million Cubic Feet) GOM = Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA-895, "Monthly and Annual Quantity and Value of Natural Gas Report," and the United States Mineral Management

159

Finding Six-Figure ROI From Energy Efficiency | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding Six-Figure ROI From Energy Efficiency Finding Six-Figure ROI From Energy Efficiency Finding Six-Figure ROI From Energy Efficiency September 28, 2010 - 10:20am Addthis Kevin Craft What are the key facts? Recovery Act funded energy efficiency lighting upgrades in Huntington, New York. Street lighting accounts for 40% of town's electric costs. Huntington estimates $151,000 in annual savings through lighting changes. Return-on-investment -- that is the phrase town officials in Huntington, New York, carefully considered before commissioning several projects to improve municipal energy efficiency. "Saving town residents money on energy bills is one way to help stimulate the local economy. So we looked for projects that would save our residents as much money as possible," said Huntington Supervisor Frank Petrone.

160

Finding Six-Figure ROI From Energy Efficiency | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Finding Six-Figure ROI From Energy Efficiency Finding Six-Figure ROI From Energy Efficiency Finding Six-Figure ROI From Energy Efficiency September 28, 2010 - 10:20am Addthis Kevin Craft What are the key facts? Recovery Act funded energy efficiency lighting upgrades in Huntington, New York. Street lighting accounts for 40% of town's electric costs. Huntington estimates $151,000 in annual savings through lighting changes. Return-on-investment -- that is the phrase town officials in Huntington, New York, carefully considered before commissioning several projects to improve municipal energy efficiency. "Saving town residents money on energy bills is one way to help stimulate the local economy. So we looked for projects that would save our residents as much money as possible," said Huntington Supervisor Frank Petrone.

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys  

E-Print Network (OSTI)

Std Dev Cost Per Annual Cost Per kWh Usage Peak kW AverageStd Dev Cost Per Annual Cost Per kWh Usage Peak kW Average3-2. Logged Outage Cost per Annual kWh Figure 3-3. Logged

Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

2003-01-01T23:59:59.000Z

162

Microsoft Word - Figure_3_4.doc  

Gasoline and Diesel Fuel Update (EIA)

7 7 0 1 2 3 4 5 6 7 T e x a s G u l f o f M e x i c o O k l a h o m a N e w M e x i c o W y o m i n g L o u i s i a n a C o l o r a d o A l a s k a K a n s a s C a l i f o r n i a A l l O t h e r S t a t e s Trillion Cubic Feet 0 30 60 90 120 150 180 Billion Cubic Meters 2003 2004 2003 Figure 4. Marketed Production of Natural Gas in Selected States and the Gulf of Mexico, 2003-2004 GOM = Gulf of Mexico Sources: Energy Information Administration (EIA), Form EIA -895, "Monthly Quantity and Value of Natural Gas Report," and the United States Mineral Management Service. Sources: Energy Information Administration (EIA), Form EIA -895, "Monthly Quantity and Value of Natural Gas Report," and the United States Mineral Management Service. None 1-15,000 15,001-100,000 100,001-200,000 200,001-500,000 500,001-and over

163

Figure 8. Renewable energy share of U.S. electricity ...  

U.S. Energy Information Administration (EIA)

Title: Figure 8. Renewable energy share of U.S. electricity generation in four cases, 2000-2040 (percent) Subject: Annual Energy Outlook 2013 Author

164

Figure 79. Electricity sales and power sector generating ...  

U.S. Energy Information Administration (EIA)

Title: Figure 79. Electricity sales and power sector generating capacity, 1949-2040 (index, 1949 = 1.0) Subject: Annual Energy Outlook 2013 Author

165

Figure 15. Renewable electricity generation in three cases ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 15. Renewable electricity generation in three cases, 2005-2040 (billion kilowatthours) Extended Policies No Sunset ...

166

Figure 17. Electricity generation from natural gas in ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 17. Electricity generation from natural gas in three cases, 2005-2040 (billion kilowatthours) Extended Policies No Sunset

167

Figure 14. Lease condensate and natural gas plant liquids ...  

U.S. Energy Information Administration (EIA)

Figure 14 Date % LC % NGPL NGL Reserves Bn Barrels OGR-Brent Average 2009-2011 Liquids Reserves NGPL Reserves Condensate Reserves % Lease condensate ...

168

Figure 58. Residential sector adoption of renewable energy ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 58. Residential sector adoption of renewable energy technologies in two cases, 2005-2040 PV and wind (gigawatts) Heat pump ...

169

Figure 1. Microsupercapacitors developed with novel carbon nano-  

E-Print Network (OSTI)

Figure 1. Microsupercapacitors developed with novel carbon nano- onion electrodes exhibit extremely resolution (Balke et al, Nano Letters 10, 3420, 2010). #12;

170

Mobility of Ions in Lanthanum Fluoride Nanoclusters--Figure 9  

Science Conference Proceedings (OSTI)

c, d. Figure 9. Shows the r-dependence of this function at several different temperatures. At each temperature the upper graph represents the F- van Hove ...

171

Figure 59. Commercial delivered energy intensity in four cases ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 59. Commercial delivered energy intensity in four cases, 2005-2040 (index, 2005 = 1) Reference case 2011 Technology case

172

Figure 55. Residential delivered energy intensity in four ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 55. Residential delivered energy intensity in four cases, 2005-2035 (index, 2005 = 1) Best Available Technology case High Technology case

173

Figure 64. Industrial energy consumption by fuel, 2011, 2025, and ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 64. Industrial energy consumption by fuel, 2011, 2025, and 2040 (quadrillion Btu) Natural Gas Petroleum and other liquids

174

Figure 63. Industrial delivered energy consumption by application ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 63. Industrial delivered energy consumption by application, 2011-2040 (quadrillion Btu) Manufacturing heat and power Nonmanufacturing heat ...

175

Figure 51. World production of liquids from biomass, coal ...  

U.S. Energy Information Administration (EIA)

Title: Figure 51. World production of liquids from biomass, coal, and natural gas in three cases, 2011 and 2040 (million barrels per day) Subject

176

Figure 18. Energy-related carbon dioxide emissions in three ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 18. Energy-related carbon dioxide emissions in three cases, 2005-2040 (million metric tons) Extended Policies No Sunset

177

Ayn Rand, Alberti and the Authorial Figure of the Architect  

E-Print Network (OSTI)

Authorial Figure of the Architect Marvin Trachtenberg Whatnor was it written by an architect, historian, or critic. InRoark, an aspiring architect who, echoing the megalomania of

Trachtenberg, Marvin

2011-01-01T23:59:59.000Z

178

Annual Energy Outlook with Projections to 2025-Figure 1. Energy...  

Gasoline and Diesel Fuel Update (EIA)

With Projections to 2025 Figure 1. Energy price projectionsm 2001-2025: AEO2002 and AEO2003 compared (2001 dollars). For more detailed information, contact the National Energy...

179

Figure 77. Electricity generation capacity additions by fuel type ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 77. Electricity generation capacity additions by fuel type, including combined heat and power, 2012-2040 (gigawatts) Coal

180

Figure 57. Change in residential delivered energy consumption ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 57. Change in residential delivered energy consumption for selected end uses in four cases, 2011-2040 (percent) Best Available Technology

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Figure 6. Type of Homes by Insulation, 2001  

U.S. Energy Information Administration (EIA)

Home >>Residential Home Page>>Insulation > Figure 6. Type of Homes by Insulation, 2001. To Top. Contacts: Specific questions may be directed to:

182

Figure 5. Percentage change in natural gas dry production and ...  

U.S. Energy Information Administration (EIA)

Figure 5. Percentage change in natural gas dry production and number of gas wells in the United States, 2007?2011 annual ...

183

41 List of Figures, Tables and Examples  

E-Print Network (OSTI)

This report was prepared by Brian Curtis as an independent consultant to the U.S. Department of Energy. It is intended to provide an objective view of the evolving ethanol industry and many of its key participants. It is the first effort to establish an annual “Year in Review, ” report for use by industry, investors, policy makers and regulators. This report covers the period Jan 2007 – Feb 2008. FUNDED BY THE OFFICE OF THE BIOMASS PROGRAM The Office of Energy Efficiency and Renewable Energy’s Biomass Program works with industry, academia and national laboratory partners on a balanced approach to advance biomass as a significant and sustainable energy source for the 21st century. Through research, development and demonstration efforts geared towards establishing the integrated biorefinery model, the Biomass Program is helping transform the nation’s renewable and abundant biomass resources into cost competitive high performance biofuels, bioproducts and biopower. In his 2007 State of the Union address, the President established aggressive goals to reduce gasoline consumption through efficiency and adoption of alternative fuels, resulting in the December 2007 passage of the Energy Independence and Security Act of 2007. Consequently, the Biomass Program is focusing its efforts to ensure that advanced biofuels are cost competitive by 2012. Another major effort of the Program is to further develop infrastructure and opportunities for market penetration of biobased fuels and products.

unknown authors

2008-01-01T23:59:59.000Z

184

Cartel Pricing Dynamics with Cost Variability and Endogenous Buyer Detection  

E-Print Network (OSTI)

of the cartel price to cost is most easily seen for large trends in cost. In Figure 1-b, cost rises over periodsCartel Pricing Dynamics with Cost Variability and Endogenous Buyer Detection Joseph E. Harrington characterizes collusive pricing patterns when buyers may detect the presence of a cartel. Buyers are assumed

Niebur, Ernst

185

So how much will it cost to build a nuke?  

SciTech Connect

Trying to get a better understanding of the different estimates of the cost of nuclear power, Prof. Francois Leveque of Mines ParisTech and Marcelo Saguan of Microeconomix examined seven studies published since 2000. They examined levelized cost, which captures the cost of electricity generation from nuclear reactors over the entire life cycle, including initial investment costs, operations and maintenance costs, cost of fuel, cost of capital, and decommissioning. The results, in 2007 euro/MWh, vary from 18 to 80. Making matters worse, more recent studies show an upward trend: the average value for studies published in 2003--05 is about 43 euro/MWh, while those published in 2007--09 average 63 euro2007/MWh. One reason for the different results is different assumptions about the main cost drivers and how they may vary over time. With the advent of third-generation nuclear reactors, numbers in the range of $1,000/kW (approx. 750 euro/kW) were being tossed around, suggesting a $1 billion investment for a 1,000 MW plant. A 2003 MIT study assumed an overnight cost of 1,750 euro/kW, with later studies raising the numbers to 3,000 euro/kW (approx. US$ 4,500). In 2008, Progress Energy Florida put the price tag for 2 new reactors it is planning to build on the Gulf Coast of Florida at $14 billion with another $3 billion for transmission and related expenses. Likewise, Florida Power & Light figures it would cost $20 billion for 2 new reactors at its Turkey Point site in Florida. These higher cost estimates and significant uncertainties about the true costs pose serious challenges to the competitiveness of nuclear power.

NONE

2010-01-15T23:59:59.000Z

186

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

cost studies project retail electricity rate increases of nochanges in retail electricity rates, and (2) monthlydeployment on retail electricity rates and bills. Direct

Chen, Cliff

2009-01-01T23:59:59.000Z

187

Figure 6. Electricity Market Model Supply Regions  

E-Print Network (OSTI)

The NEMS Electricity Market Module (EMM) represents the capacity planning, dispatching, and pricing of electricity. It is composed of four submodules—electricity capacity planning, electricity fuel dispatching, load and demand electricity, and electricity finance and pricing. It includes nonutility capacity and generation, and electricity transmission and trade. A detailed description of the EMM is provided in the EIA publication, Electricity Market Module of the National Energy Modeling System 2010, DOE/EIA-M068(2010). Based on fuel prices and electricity demands provided by the other modules of the NEMS, the EMM determines the most economical way to supply electricity, within environmental and operational constraints. There are assumptions about the operations of the electricity sector and the costs of various options in each of the EMM submodules. This section describes the model parameters and assumptions used in EMM. It includes a discussion of legislation and regulations that are incorporated in EMM as well as information about the climate change action plan. The various electricity and technology cases are also described.

unknown authors

2010-01-01T23:59:59.000Z

188

U.S. Department of Energy Hydrogen Storage Cost Analysis  

SciTech Connect

The overall objective of this project is to conduct cost analyses and estimate costs for on- and off-board hydrogen storage technologies under development by the U.S. Department of Energy (DOE) on a consistent, independent basis. This can help guide DOE and stakeholders toward the most-promising research, development and commercialization pathways for hydrogen-fueled vehicles. A specific focus of the project is to estimate hydrogen storage system cost in high-volume production scenarios relative to the DOE target that was in place when this cost analysis was initiated. This report and its results reflect work conducted by TIAX between 2004 and 2012, including recent refinements and updates. The report provides a system-level evaluation of costs and performance for four broad categories of on-board hydrogen storage: (1) reversible on-board metal hydrides (e.g., magnesium hydride, sodium alanate); (2) regenerable off-board chemical hydrogen storage materials(e.g., hydrolysis of sodium borohydride, ammonia borane); (3) high surface area sorbents (e.g., carbon-based materials); and 4) advanced physical storage (e.g., 700-bar compressed, cryo-compressed and liquid hydrogen). Additionally, the off-board efficiency and processing costs of several hydrogen storage systems were evaluated and reported, including: (1) liquid carrier, (2) sodium borohydride, (3) ammonia borane, and (4) magnesium hydride. TIAX applied a â��bottom-upâ� costing methodology customized to analyze and quantify the processes used in the manufacture of hydrogen storage systems. This methodology, used in conjunction with DFMA�® software and other tools, developed costs for all major tank components, balance-of-tank, tank assembly, and system assembly. Based on this methodology, the figure below shows the projected on-board high-volume factory costs of the various analyzed hydrogen storage systems, as designed. Reductions in the key cost drivers may bring hydrogen storage system costs closer to this DOE target. In general, tank costs are the largest component of system cost, responsible for at least 30 percent of total system cost, in all but two of the 12 systems. Purchased BOP cost also drives system cost, accounting for 10 to 50 percent of total system cost across the various storage systems. Potential improvements in these cost drivers for all storage systems may come from new manufacturing processes and higher production volumes for BOP components. In addition, advances in the production of storage media may help drive down overall costs for the sodium alanate, SBH, LCH2, MOF, and AX-21 systems.

Law, Karen; Rosenfeld, Jeffrey; Han, Vickie; Chan, Michael; Chiang, Helena; Leonard, Jon

2013-03-11T23:59:59.000Z

189

Trends in the cost of efficiency for appliances and consumer electronics  

E-Print Network (OSTI)

Furthermore, the projected price trends developed are likelyTrends in the cost of efficiency for appliances and consumerwith and without price trends. Figure 3: Comparison of

Desroches, Louis-Benoit

2013-01-01T23:59:59.000Z

190

Trends in the cost of efficiency for appliances and consumer electronics  

E-Print Network (OSTI)

and costs, and includes projections of annual shipments,calibrate future shipment projections in the NIA. Figure 1the default price trend projection. The resulting experience

Desroches, Louis-Benoit

2013-01-01T23:59:59.000Z

191

Weighing the Costs and Benefits of State Renewables Portfolio Standards in the United States: A Comparative Analysis of State-Level Policy Impact Projections  

E-Print Network (OSTI)

estimates that electricity rates in the state could increasethe state RPS cost studies project retail electricity rateelectricity rate impacts in percentage and ˘/kWh terms, for each individual state

Chen, Cliff

2009-01-01T23:59:59.000Z

192

Figure 3 from "Plutonium: Coping with Instability" by Siegfried S ...  

Science Conference Proceedings (OSTI)

This figure shows the (a) U.S. and (b) Russian versions of the Pu-Ga phase diagram. The Russian version, with a eutectoid point of 97°C and 7.9 at.% Ga, is

193

Figure 88. Annual average Henry Hub spot prices for natural ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 88. Annual average Henry Hub spot prices for natural gas in five cases, 1990-2040 (2011 dollars per million Btu) Reference

194

Figure 86. Annual average Henry Hub spot natural gas prices ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 86. Annual average Henry Hub spot natural gas prices, 1990-2040 (2011 dollars per million Btu) Henry Hub Spot Price 1990.00

195

Figure ES2. Annual Indices of Real Disposable Income, Vehicle...  

U.S. Energy Information Administration (EIA) Indexed Site

ES2 Figure ES2. Annual Indices of Real Disposable Income, Vehicle-Miles Traveled, Consumer Price Index (CPI-U), and Real Average Retail Gasoline Price, 1978-2004, 1985100...

196

Figure 6. Transportation energy consumption by fuel, 1990-2040 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 6. Transportation energy consumption by fuel, 1990-2040 (quadrillion Btu) Motor Gasoline, no E85 Pipeline Other E85 Jet Fuel

197

Figure 5. Energy-related carbon dioxide emissions in four ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Reference High Oil/Gas Resouce CO2$15 CO2$15HR Released: May 2, 2013 Figure 5. Energy-related carbon dioxide emissions in four ...

198

Figure 10.1 Renewable Energy Consumption (Quadrillion Btu)  

U.S. Energy Information Administration (EIA)

Figure 10.1 Renewable Energy Consumption (Quadrillion Btu) Total and Major Sources, 1949–2012 By Source, 2012 By Sector, 2012 Compared With Other Resources, 1949–2012

199

Particle Data Group - Figures from 2012 edition of RPP  

NLE Websites -- All DOE Office Websites (Extended Search)

Leptons Quarks Mesons Baryons Searches Figures from the Reviews in the Gauge and Higgs Boson Listings: The Mass and Width of the W Boson (rev.) Fig. 1 Fig. 2 Higgs Bosons:...

200

Particle Data Group - Figures from 2009 edition of RPP  

NLE Websites -- All DOE Office Websites (Extended Search)

Leptons Quarks Mesons Baryons Searches Figures from the Reviews in the Gauge and Higgs Boson Listings: The Mass and Width of the W Boson (Rev.) Fig. 1 Fig. 2 Higgs Bosons:...

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Particle Data Group - Figures from 2007 web update of RPP  

NLE Websites -- All DOE Office Websites (Extended Search)

Leptons Quarks Mesons Baryons Searches Figures from the Reviews in the Gauge and Higgs Boson Listings: The Mass of the W Boson Fig. 1 Searches for Higgs Bosons Fig. 1 Fig. 2...

202

Particle Data Group - Figures from 2008 edition of RPP  

NLE Websites -- All DOE Office Websites (Extended Search)

Leptons Quarks Mesons Baryons Searches Figures from the Reviews in the Gauge and Higgs Boson Listings: The Mass and Width of the W Boson Fig. 1 Fig. 2 Higgs Bosons: Theory and...

203

Particle Data Group - Figures from 2010 edition of RPP  

NLE Websites -- All DOE Office Websites (Extended Search)

Leptons Quarks Mesons Baryons Searches Figures from the Reviews in the Gauge and Higgs Boson Listings: The Mass and Width of the W Boson (rev.) Fig. 1 Fig. 2 Higgs Bosons:...

204

Particle Data Group - Figures from 2011 edition of RPP  

NLE Websites -- All DOE Office Websites (Extended Search)

Leptons Quarks Mesons Baryons Searches Figures from the Reviews in the Gauge and Higgs Boson Listings: The Mass and Width of the W Boson (2010) Fig. 1 Fig. 2 Higgs Bosons:...

205

Figure 7.9 Coal Prices - Energy Information Administration  

U.S. Energy Information Administration (EIA)

Figure 7.9 Coal Prices Total, 1949-2011 By Type, 1949-2011 By Type, 2011 214 U.S. Energy Information Administration / Annual Energy Review 2011

206

Sheet Metal Forming: A Review - Figure 6 - TMS  

Science Conference Proceedings (OSTI)

Figure 6. Forming-limit diagram for low-carbon steel. Data of Reference 6 have been replotted and a dashed line has been added for maximum tension (T = st), ...

207

Figure SR2. Net Imports as Percentage of Domestic Consumption ...  

U.S. Energy Information Administration (EIA)

Figure SR2 of the U.S. Natural Gas Imports & Exports: 2009. This report provides an overview of U.S. international natural gas trade in 2009. Natural gas import and ...

208

A system-wide productivity figure of merit  

Science Conference Proceedings (OSTI)

The goal of this note is to combine productivity and performance benchmark measurement and subjective evaluations into a single system-wide figure of merit that could, for example, be used for budget justifications and procurements. With simplifying ...

Declan Murphy; Thomas Nash; Lawrence Votta

2006-01-01T23:59:59.000Z

209

Typical Clothing Ensemble Insulation Levels for Sixteen Body Parts  

E-Print Network (OSTI)

Thermal Comfort.1994 CLO Insulation Levels For Sixteen Bodya mesh arm chair whose insulation level was measured. FigureExperimental Conditions. CLO Insulation Levels For Sixteen

Lee, Juyoun; Zhang, Hui; Arens, Edward

2013-01-01T23:59:59.000Z

210

The unit cost factors and calculation methods for decommissioning - Cost estimation of nuclear research facilities  

SciTech Connect

Available in abstract form only. Full text of publication follows: The uncertainties of decommissioning costs increase high due to several conditions. Decommissioning cost estimation depends on the complexity of nuclear installations, its site-specific physical and radiological inventories. Therefore, the decommissioning costs of nuclear research facilities must be estimated in accordance with the detailed sub-tasks and resources by the tasks of decommissioning activities. By selecting the classified activities and resources, costs are calculated by the items and then the total costs of all decommissioning activities are reshuffled to match with its usage and objectives. And the decommissioning cost of nuclear research facilities is calculated by applying a unit cost factor method on which classification of decommissioning works fitted with the features and specifications of decommissioning objects and establishment of composition factors are based. Decommissioning costs of nuclear research facilities are composed of labor cost, equipment and materials cost. Of these three categorical costs, the calculation of labor costs are very important because decommissioning activities mainly depend on labor force. Labor costs in decommissioning activities are calculated on the basis of working time consumed in decommissioning objects and works. The working times are figured out of unit cost factors and work difficulty factors. Finally, labor costs are figured out by using these factors as parameters of calculation. The accuracy of decommissioning cost estimation results is much higher compared to the real decommissioning works. (authors)

Kwan-Seong Jeong; Dong-Gyu Lee; Chong-Hun Jung; Kune-Woo Lee [Korea Atomic Energy Research Institute, Deokjin-dong 150, Yuseong-gu, Daejeon 305-353 (Korea, Republic of)

2007-07-01T23:59:59.000Z

211

Cost increases at fusion project going critical David Kramer  

E-Print Network (OSTI)

Cost increases at fusion project going critical David Kramer Citation: Phys. Today 66(7), 24 (2013 Office to figure out how much the project will cost and what the US will have to pay. During a hearing. Congress can't evaluate the cost without a project baseline." Feinstein said she'd been told by DOE

212

Figure 28. Power sector electricity generation capacity by ...  

U.S. Energy Information Administration (EIA)

Natural gas combustion turbine Nuclear Renewable/other Reference Low Oil and Gas Resource High Oil and Gas Resource Low Coal Cost High Coal Cost ...

213

Estimating decommissioning costs: The 1994 YNPS decommissioning cost study  

Science Conference Proceedings (OSTI)

Early this year, Yankee Atomic Electric Company began developing a revised decommissioning cost estimate for the Yankee Nuclear Power Station (YNPS) to provide a basis for detailed decommissioning planning and to reflect slow progress in siting low-level waste (LLW) and spent-nuclear-fuel disposal facilities. The revision also reflects the need to change from a cost estimate that focuses on overall costs to a cost estimate that is sufficiently detailed to implement decommissioning and identify the final cost of decommissioning.

Szymczak, W.J.

1994-12-31T23:59:59.000Z

214

Methods | Transparent Cost Database  

Open Energy Info (EERE)

Methods Methods Disclaimer The data gathered here are for informational purposes only. Inclusion of a report in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a single discount rate in order to compare technology costs only. About the Cost Database For emerging energy technologies, a variety of cost and performance numbers are cited in presentations and reports for present-day characteristics and potential improvements. Amid a variety of sources and methods for these data, the Office of Energy Efficiency and Renewable Energy's technology development programs determine estimates for use in program planning. The Transparent Cost Database collects program cost and performance

215

Transmission line capital costs  

Science Conference Proceedings (OSTI)

The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

Hughes, K.R.; Brown, D.R.

1995-05-01T23:59:59.000Z

216

Thermoelectric figure of merit of LSCoO-Mn perovskites  

Science Conference Proceedings (OSTI)

Oxide ceramics with nominal composition of La"0"."8Sr"0"."2Co"1"-"xMn"xO"3(0= Keywords: 72.20.Pa, 84.60.Bk, 84.60.Rb, 85.80.Fi, LSCoO compounds, Thermoelectric figure of merit, Thermoelectric materials

J. E. Rodríguez; D. Cadavid; L. C. Moreno

2008-11-01T23:59:59.000Z

217

Object Recognition by Sequential Figure-Ground Ranking  

Science Conference Proceedings (OSTI)

We present an approach to visual object-class segmentation and recognition based on a pipeline that combines multiple figure-ground hypotheses with large object spatial support, generated by bottom-up computational processes that do not exploit knowledge ... Keywords: Learning and ranking, Object recognition, Semantic segmentation

Joăo Carreira; Fuxin Li; Cristian Sminchisescu

2012-07-01T23:59:59.000Z

218

List of Figures xii List of Tables xv  

E-Print Network (OSTI)

. . . . . . . . . . . . . . . . . . . . . . . . 137 II Energy Supply Chains 139 6 Electric Power Supply Chains 141 6.1 The Supply Chain ModelContents List of Figures xii List of Tables xv Preface xvi I Supply Chain Networks 1 1 Introduction and Overview 3 2 Supply Chain Networks 9 2.1 The Supply Chain Network Model . . . . . . . . . . . . . . . 11 2

Nagurney, Anna

219

Figure 62. Additions to electricity generation capacity in the ...  

U.S. Energy Information Administration (EIA)

Microturbines Wind Solar photovoltaics Released: April 30, 2013 No Sunset $0.90 $0.80 $2.27 $2.15 $5.04 $4.65 $2.96 $0.66 $13.72 $10.17. Title: Figure 62.

220

shown in Figure1. Figure 1- Site Plan National Grid Reference  

E-Print Network (OSTI)

Scroby Sands Offshore Wind Farm’s third year of operation is summarised in this report. The operation in the two previous years has similarly been reported previously. Scroby Sands Offshore Wind Farm is situated on a sand bank a little over two nautical miles off the coast of Norfolk and consists of 30 2MW turbines giving a capacity of 60MW. The wind farm has completed its third year of operation as summarised within this report. Scroby Sands is a pioneering project being one of the first offshore wind farms in the UK. The learning and experience in operating and maintaining the wind farm has been instrumental in improving reliability, reducing maintenance costs and reducing repair durations. The third year of operation has been successful with both the availability and production performance of the wind farm better than forecast. This was achieved despite the unexpected failure in April of both a cable transition joint (repaired promptly in April) and a sub-sea cable on one of

unknown authors

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Cost analysis guidelines  

Science Conference Proceedings (OSTI)

The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

Strait, R.S.

1996-01-10T23:59:59.000Z

222

New England Wind Forum: Cost Trends  

Wind Powering America (EERE)

Cost Trends Cost Trends Figure 1: Cost of Energy and Cumulative Domestic Capacity This graph shows how the cumulative domestic wind capacity (MW) has increased since 1980, while the cost of energy from wind power has declined by a factor of approximately 20 times during the same period but has increased slightly since 2001. Click on the image to view a larger version. This graph shows how the cumulative domestic wind capacity (MW) has increased since 1980, while the cost of energy from wind power has declined by a factor of approximately 20 times during the same period but has increased slightly since 2001. View a larger version of the graph. Overall, the wind industry is experiencing long-term decreases in the cost to produce wind-generated electricity (Figure 1), despite recent short-term increases in upfront equipment costs. Even in the short term, however, the effect of increases in up-front capital costs on the cost of energy from wind power projects has been dampened by improvements in energy capture from the wind and decreases in operating and maintenance costs.

223

Electricity Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Emissions Caps and the Impact of a Radical Change in Nuclear Electricity Costs journal International Journal of Energy Economics and Policy volume year month chapter...

224

FIRM PRODUCTIVITY AND SUNK COSTS  

E-Print Network (OSTI)

The main objective of this paper is to explore whether or not sunk costs are systematically related to productivity di¤erences at the …rm level, as suggested by models of industry dynamics (Hopenhayn, 1992).The comparisons of productivity distributions for groups of …rms with di¤erent levels of sunk costs are performed by non-parametric procedures and for a large scale …rm-level panel data set of Spanish manufacturing …rms. We …nd that sunk costs are an important source of heterogeneity across …rm productivity. The evidence we …nd is consistent with models of industry dynamics predicting lower productivity for …rms with a higher level of sunk costs.

Jose C. Farińas; Sonia Ruano

2004-01-01T23:59:59.000Z

225

Download Data | Transparent Cost Database  

Open Energy Info (EERE)

in the database does not represent approval of the estimates by DOE or NREL. Levelized cost calculations DO NOT represent real world market conditions. The calculation uses a...

226

Figure 30. Decomposition 4941 of Energy Use by Effect, 1988-1994 ...  

U.S. Energy Information Administration (EIA)

Home > Households, Buildings & Industry >Transportation Surveys > Household Vehicles Energy Use > Figure 30

227

Figure ES4. Sales-Weighted Inertia Weight and On-Road Fuel Mileage ...  

U.S. Energy Information Administration (EIA)

Home > Households, Buildings & Industry >Transportation Surveys > Household Vehicles Energy Use > Figure ES4

228

Figure ES3. Sales-Weighted Horsepower and On-Road Fuel Mileage for ...  

U.S. Energy Information Administration (EIA)

Home > Households, Buildings & Industry >Transportation Surveys > Household Vehicles Energy Use > Figure ES3

229

Figure ES1. Schema for Estimating Energy and Energy-Related ...  

U.S. Energy Information Administration (EIA)

Home > Households, Buildings & Industry >Transportation Surveys > Household Vehicles Energy Use > Figure ES1

230

LIFE Cost of Electricity, Capital and Operating Costs  

Science Conference Proceedings (OSTI)

Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

Anklam, T

2011-04-14T23:59:59.000Z

231

NOvA (Fermilab E929) Official Plots and Figures  

DOE Data Explorer (OSTI)

The NOvA collaboration, consisting of 180 researchers across 28 institutions and managed by the Fermi National Accelerator Laboratory (FNAL), is developing instruments for a neutrino-focused experiment that will attempt to answer three fundamental questions in neutrino physics: 1) Can we observe the oscillation of muon neutrinos to electron neutrinos; 2) What is the ordering of the neutrino masses; and 3) What is the symmetry between matter and antimatter? The collaboration makes various data plots and figures available. These are grouped under five headings, with brief descriptions included for each individual figure: Neutrino Spectra, Detector Overview, Theta12 Mass Hierarchy CP phase, Theta 23 Delta Msqr23, and NuSterile.

232

Investigation to Discover Most Effective Method of Teaching Target Costing to Construction-Minded Individuals  

E-Print Network (OSTI)

The construction industry is in the midst of a progressive change in the way projects unfold from design and development to closeout and maintenance. There is a greater demand on contractors to build projects faster, with higher quality and an increased level of detail, while keeping costs lower than ever. Therefore, to meet such demands contractors must turn to an alternative approach of improving product and process with target costing. However, the adoption of target costing by the construction industry has been slow due to limitations in user understanding of the system. The objective of this paper is to identify an effective approach for teaching target costing to construction-focused individuals, by establishing improved user understanding with visual aids, and by determining if user comprehension is influenced by the complexity of the visual supports provided in the lessons. The study challenged the long-implied assumption that the construction community is composed of visual learners, while also differentiating between the levels of success for supporting figures based upon their degree of detail. Results of this study will provide the basis for the development of target costing material that is designed specifically for use in the education of construction industry professionals in Target Cost Estimating.

Hullum, Joshua James

2011-05-01T23:59:59.000Z

233

Types of Costs Types of Cost Estimates  

E-Print Network (OSTI)

· Types of Costs · Types of Cost Estimates · Methods to estimate capital costs MIN E 408: Mining the equipment for reclamation? Types of Costs #12;· Marginal Cost: ­ Change in total cost ­ Any production process involves fixed and variable costs. As production increases/expands, fixed costs are unchanged, so

Boisvert, Jeff

234

Drilling costs drop 7% in 1985  

SciTech Connect

Drilling costs dropped about 7% last year. This decline cancels a slight increase in 1984. Total costs to drill now run about 59% of the 1981 highs. Comparable figures for the previous 2 years are 63 and 61%. Deeper wells showed the biggest drops. Shallow well costs fell about 6%. Energy Information Administration (EIA) indexes drilling costs on a 1976 base year. Costs for shallow wells (5,000 ft or less) show an index about 138. Deeper wells have an index around 149. Cost declines were the greatest in West and North Texas and the Rockies, of 11%. The Northeast and Western areas showed greater than average declines, 9% or so. The High Plains, New Mexico, and Midcontinent areas recorded near the average 7% decline. Costs in South Louisiana, the Southeast, and Ark-La-Tex 2%. West Central Texas costs were off only 1%. The Southeast was essentially unchanged. Indexes by area show generally that drilling costs have declined since 1983. The summary here comes from EIA's ''Indexes and Estimates of Domestic Well Drilling Costs 1984 and 1985''. That report covers oil, gas, and dry hole costs, cost components, and overall costs.

Anderson, T.; Funk, V.

1986-03-24T23:59:59.000Z

235

Low cost electronic ultracapacitor interface technique to provide load leveling of a battery for pulsed load or motor traction drive applications  

DOE Patents (OSTI)

A battery load leveling arrangement for an electrically powered system in which battery loading is subject to intermittent high current loading utilizes a passive energy storage device and a diode connected in series with the storage device to conduct current from the storage device to the load when current demand forces a drop in battery voltage. A current limiting circuit is connected in parallel with the diode for recharging the passive energy storage device. The current limiting circuit functions to limit the average magnitude of recharge current supplied to the storage device. Various forms of current limiting circuits are disclosed, including a PTC resistor coupled in parallel with a fixed resistor. The current limit circuit may also include an SCR for switching regenerative braking current to the device when the system is connected to power an electric motor.

King, Robert Dean (Schenectady, NY); DeDoncker, Rik Wivina Anna Adelson (Malvern, PA)

1998-01-01T23:59:59.000Z

236

cost | OpenEI  

Open Energy Info (EERE)

cost cost Dataset Summary Description The following data-set is for a benchmark residential home for all TMY3 locations across all utilities in the US. The data is indexed by utility service provider which is described by its "unique" EIA ID ( Source National Renewable Energy Laboratory Date Released April 05th, 2012 (2 years ago) Date Updated April 06th, 2012 (2 years ago) Keywords AC apartment CFL coffeemaker Computer cooling cost demand Dishwasher Dryer Furnace gas HVAC Incandescent Laptop load Microwave model NREL Residential television tmy3 URDB Data text/csv icon Residential Cost Data for Common Household Items (csv, 14.5 MiB) Quality Metrics Level of Review Some Review Comment Temporal and Spatial Coverage Frequency Annually Time Period License License Open Data Commons Public Domain Dedication and Licence (PDDL)

237

Evaluation of solar mirror figure by moire contouring  

DOE Green Energy (OSTI)

Moire topography is applied to the figure assessment of solar mirrors. The technique is demonstrated on component facets of a six-meter diameter, four-meter focal length, parabolic dish collector. The relative ease of experimental implementation and subsequent data analysis suggests distinct advantages over the more established laser ray trace or BCS/ICS technique for many applications. The theoretical and experimental considerations necessary to fully implement moire topography on mirror surfaces are detailed. A procedure to de-specularize the mirror is demonstrated which conserves the surface morphology without damaging the reflective surface. The moire fringe patterns observed for the actual mirror facets are compared with theoretical contours generated for representative dish facets using a computer simulation algorithm. A method for evaluating the figure error of the real facet is presented in which the error parameter takes the form of an average absolute deviation of the surface slope from theoretical. The experimental measurement system used for this study employs a 200 line/inch Ronchi transmission grating. The mirror surface is illuminated by a collimated beam at 60/sup 0/. The fringe observation is performed normal to the grating. These parameters yield contour intervals for the fringe patterns of 0.073 mm. The practical considerations for extending the techniques to higher resolution are discussed.

Griffin, J.W.; Lind, M.A.

1980-06-01T23:59:59.000Z

238

Fermilab E866 (NuSea) Figures and Data Plots  

DOE Data Explorer (OSTI)

The NuSea Experiment at Fermilab studied the internal structure of protons, in particular the difference between up quarks and down quarks. This experiment also addressed at least two other physics questions: nuclear effects on the production of charmonia states (bound states of charm and anti-charm quarks) and energy loss of quarks in nuclei from Drell-Yan measurements on nuclei. While much of the NuSea data are available only to the collaboration, figures, data plots, and tables are presented as stand-alone items for viewing or download. They are listed in conjunction with the published papers, theses, or presentations in which they first appeared. The date range is 1998 to 2008. To see these figures and plots, click on E866 publications or go directly to http://p25ext.lanl.gov/e866/papers/papers.html. Theses are at http://p25ext.lanl.gov/e866/papers/e866theses/e866theses.html and the presentations are found at http://p25ext.lanl.gov/e866/papers/e866talks/e866talks.html. Many of the items are postscript files.

E866 NuSea Collaboration

239

Figure 7a. Type of Home by Level of Drafts, 2001  

U.S. Energy Information Administration (EIA)

The RECS relies on the respondents to provide the energy-related details of their homes. Typically, the respondents do not know technical details such as the type of ...

240

Noise figure and photon probability distribution in Coherent Anti-Stokes Raman Scattering (CARS)  

E-Print Network (OSTI)

The noise figure and photon probability distribution are calculated for coherent anti-Stokes Raman scattering (CARS) where an anti-Stokes signal is converted to Stokes. We find that the minimum noise figure is ~ 3dB.

Dimitropoulos, D; Jalali, B; Solli, D R

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Cost estimating method of industrial product implemented in WinCOST software system  

Science Conference Proceedings (OSTI)

The paper presents a method for estimating the cost of industrial products and its implementation into a software system named WinCOST. The software is used for calculating the manufacturing time and cost evaluation of industrial products with high level ... Keywords: chip removing process, cold forming processes, cost estimation, cost per hour, software system

Gheorghe Oancea; Lucia Antoneta Chicos; Camil Lancea

2010-07-01T23:59:59.000Z

242

Determining the Cost of Producing Ethanol from Corn Starch and Lignocellulosic Feedstocks  

DOE Green Energy (OSTI)

The mature corn-to-ethanol industry has many similarities to the emerging lignocellulose-to-ethanol industry. It is certainly possible that some of the early practitioners of this new technology will be the current corn ethanol producers. In order to begin to explore synergies between the two industries, a joint project between two agencies responsible for aiding these technologies in the Federal government was established. This joint project of the USDA-ARS and DOE/NREL looked at the two processes on a similar process design and engineering basis, and will eventually explore ways to combine them. This report describes the comparison of the processes, each producing 25 million annual gallons of fuel ethanol. This paper attempts to compare the two processes as mature technologies, which requires assuming that the technology improvements needed to make the lignocellulosic process commercializable are achieved, and enough plants have been built to make the design well-understood. Ass umptions about yield and design improvements possible from continued research were made for the emerging lignocellulose process. In order to compare the lignocellulose-to-ethanol process costs with the commercial corn-to-ethanol costs, it was assumed that the lignocellulose plant was an Nth generation plant, built after the industry had been sufficiently established to eliminate first-of-a-kind costs. This places the lignocellulose plant costs on a similar level with the current, established corn ethanol industry, whose costs are well known. The resulting costs of producing 25 million annual gallons of fuel ethanol from each process were determined. The figure below shows the production cost breakdown for each process. The largest cost contributor in the corn starch process is the feedstock; for the lignocellulosic process it is the capital cost, which is represented by depreciation cost on an annual basis.

McAloon, A.; Taylor, F.; Yee, W.; Ibsen, K.; Wooley, R.

2000-10-25T23:59:59.000Z

243

A1. Form EIA-176 Figure Energy Information Administration  

Gasoline and Diesel Fuel Update (EIA)

Form EIA-176 Form EIA-176 Figure Energy Information Administration / Natural Gas Annual 1996 214 EIA-176, ANNUAL REPORT OF NATURAL AND SUPPLEMENTAL GAS SUPPLY AND DISPOSITION, 19 PART IV: SUPPLY OF NATURAL AND SUPPLEMENTAL GAS RECEIVED WITHIN OR TRANSPORTED INTO REPORT STATE RESPONDENT COPY Page 2 PART III: TYPE OF COMPANY AND GAS ACTIVITIES OPERATED IN THE REPORT STATE 1.0 Type of Company (check one) 1.0 Control No. 2.0 Company Name 3.0 Report State 4.0 Resubmittal EIA Date: a b c d e Investor owned distributor Municipally owned distributor Interstate pipeline Intrastate pipeline Storage operator f g h i j SNG plant operator Integrated oil and gas Producer Gatherer Processor k Other (specify) 2.0 Gas Activities Operated On-system Within the Report State (check all that apply) a b c d e Produced Natural Gas

244

STAR (Solenoidal Tracker at RHIC) Figures and Data  

DOE Data Explorer (OSTI)

The primary physics task of STAR is to study the formation and characteristics of the quark-gluon plasma (QGP), a state of matter believed to exist at sufficiently high energy densities. STAR consists of several types of detectors, each specializing in detecting certain types of particles or characterizing their motion. These detectors work together in an advanced data acquisition and subsequent physics analysis that allows final statements to be made about the collision. The STAR Publications page provides access to all published papers by the STAR Collaboration, and many of them have separate links to the figures and data found in or supporting the paper. See also the data-rich summaries of the research at http://www.star.bnl.gov/central/physics/results/. [See also DDE00230

The STAR Collaboration

245

Modeling Photovoltaic and Concentrating Solar Power Trough Performance, Cost, and Financing with the Solar Advisor Model: Preprint  

Science Conference Proceedings (OSTI)

A comprehensive solar technology systems analysis model, the Solar Advisor Model (SAM), has been developed to support the federal R&D community and the solar industry by staff at the National Renewable Energy Laboratory (NREL) and Sandia National Laboratory. This model is able to model the finances, incentives, and performance of flat-plate photovoltaic (PV), concentrating PV, and concentrating solar power (specifically, parabolic troughs). The primary function of the model is to allow users to investigate the impact of variations in performance, cost, and financial parameters to better understand their impact on key figures of merit. Figures of merit related to the cost and performance of these systems include, but aren't limited to, system output, system efficiencies, levelized cost of energy, return on investment, and system capital and O&M costs. There are several models within SAM to model the performance of photovoltaic modules and inverters. This paper presents an overview of each PV and inverter model, introduces a new generic model, and briefly discusses the concentrating solar power (CSP) parabolic trough model. A comparison of results using the different PV and inverter models is also presented.

Blair, N.; Mehos, M.; Christensen, C.; Cameron, C.

2008-05-01T23:59:59.000Z

246

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

Addendum to Potential Impacts of Reductions in Refinery Activity on Addendum to Potential Impacts of Reductions in Refinery Activity on Northeast Petroleum Product Markets 1 May 11, 2012 ADDENDUM Potential Impacts of Reductions in Refinery Activity on Northeast Petroleum Product Markets Additional Information on Jones Act Vessels' Potential Role in Northeast Refinery Closures The U.S. Energy Information Administration's (EIA) recent report exploring the potential impacts of reductions in refinery activity in the Northeast on petroleum product markets in that region pointed out that, if Sunoco's Philadelphia refinery shuts down, waterborne movements from the Gulf Coast could be an important route for alternative supplies to help replace lost volumes in the short term, particularly for ultra-low sulfur diesel (ULSD). Because this route would involve

247

2017 Levelized Costs AEO 2012 Early Release  

U.S. Energy Information Administration (EIA) Indexed Site

February 23, 2012 February 23, 2012 Form EIA-861 and the New Form EIA-861S Proposal: Modify the frame of the Form EIA-861, "Annual Electric Power Industry Report," from a census to a sample, and use sampling methods to estimate the sales revenues and customer counts by sector and state for the remaining industry. Use random sampling, if needed, to estimate for changes in advanced metering infrastructure (AMI) and time-based tariff programs. Proposal: Create a new Form EIA-861S, "Annual Electric Power Industry Report (Short Form), for the respondents that have been removed from the Form EIA-861 frame. The form would ask them for contact information and would contain a series of yes/no questions to query their status. In addition, it would collect limited data for use in estimating. Once every five years, the

248

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

Office of Energy Markets and Financial Analysis 1 Office of Energy Markets and Financial Analysis 1 October 2012 Implications of changing correlations between WTI and other commodities, asset classes, and implied volatility Summary * Correlations among changes in the prices of commodities, and between the prices of commodities and other asset classes, generally increased from 2007 until 2012. One reason often cited for the increase in the correlation of commodity and asset price movements has been increasing economic growth in emerging market economies. * When correlations of crude oil prices with prices of multiple commodities decline, it usually implies that a supply side issue is affecting the crude oil market. When the correlation of crude oil price movements with the price movements for a specific

249

2017 Levelized Costs AEO 2012 Early Release  

U.S. Energy Information Administration (EIA) Indexed Site

highest since March of 2012. Although there was no single major disruption in oil production over the last month, lower exports from South Sudan, Iraq, and Libya and a...

250

2017 Levelized Costs AEO 2012 Early Release  

Annual Energy Outlook 2012 (EIA)

About the Oil and Gas Field Code Master List 1 April 30, 2012 About the Oil and Gas Field Code Master List The U.S. Energy Information Administration's (EIA) Oil and Gas Field Code...

251

2017 Levelized Costs AEO 2012 Early Release  

U.S. Energy Information Administration (EIA) Indexed Site

Preciado (james.preciado@eia.gov) U.S. Energy Information Administration | Short-Term Energy Outlook December 2013 2 Crude oils of both medium and light API gravity on the U.S....

252

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

Administration (EIA) has changed the format of the Short-Term Energy Outlook tables for electricity industry overview (Table 7a), electricity generation (Table 7d), electricity...

253

2017 Levelized Costs AEO 2012 Early Release  

Gasoline and Diesel Fuel Update (EIA)

Host and Presentor Contact Information 1 Host and Presentor Contact Information 1 March 2013 Workshop on Biofuels Projections in AEO Host and Presentor Contact Information Hosts: Mindi Farber-DeAnda Team Lead, Energy Information Administration, Biofuels and Emerging Technologies Mindi.Farber-DeAnda@eia.gov 202-586-6419 Vishakh Mantri, Ph.D, P.E. Chemical Engineer, Energy Information Administration, Biofuels and Emerging Technologies Team Vishakh.Mantri@eia.gov 202-586-4815 Presenters: Biofuels in the United States: Context and Outlook Howard Gruenspecht Deputy Administrator, Energy Information Administration Howard.gruenspecht@eia.gov 202-586-6351 Modeling of Biofuels in the AEO, Michael Cole Operations Research Analyst, Energy Information Administration, Liquid Fuels Market Team

254

Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage  

DOE Green Energy (OSTI)

This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation system leads to higher thermal-to-electric conversion efficiency. However, in a CSP system, higher operating temperature also leads to greater thermal losses. These two effects combine to give an optimal system-level operating temperature that may be less than the upper operating temperature limit of system components. The overall efficiency may be improved by developing materials, power cycles, and system-integration strategies that enable operation at elevated temperature while limiting thermal losses. This is particularly true for the TES system and its components. Meeting the SunShot cost target will require cost and performance improvements in all systems and components within a CSP plant. Solar collector field hardware will need to decrease significantly in cost with no loss in performance and possibly with performance improvements. As higher temperatures are considered for the power block, new working fluids, heat-transfer fluids (HTFs), and storage fluids will all need to be identified to meet these new operating conditions. Figure 1 shows thermodynamic conversion efficiency as a function of temperature for the ideal Carnot cycle and 75% Carnot, which is considered to be the practical efficiency attainable by current power cycles. Current conversion efficiencies for the parabolic trough steam cycle, power tower steam cycle, parabolic dish/Stirling, Ericsson, and air-Brayton/steam Rankine combined cycles are shown at their corresponding operating temperatures. Efficiencies for supercritical steam and carbon dioxide (CO{sub 2}) are also shown for their operating temperature ranges.

Glatzmaier, G.

2011-12-01T23:59:59.000Z

255

Cost analysis of 50 kWh zinc--chlorine batteries for mobile applications  

DOE Green Energy (OSTI)

The costs comprising the projected selling price of a 50-kWh zinc--chlorine battery for mobile applications were analyzed. This analysis is predicated on a battery whose engineering and design specifications are well crystallized. Such a design has been proposed and a process plan conceived. This, in turn, led to a simulated manufacturing plan. This analysis showed that no critical resources or complex manufacturing operations are required. The projected cost presumes a production level of 25,000 batteries per year. In that context, a selling price was estimated, in mid-1977 dollars, to be $1645 per battery or $33/kWh. This price excludes the battery charger, for which an added $400 ($8/kWh) is considered reasonable. 8 figures, 19 tables.

Catherino, H.; Henriksen, G.L.; Whittlesey, C.C.; Warde, C.J.; Carr, P.; Symons, P.C.

1978-01-01T23:59:59.000Z

256

The social costs of an MTBE ban in California (Long version)  

E-Print Network (OSTI)

an equivalent quantity (in energy terms), oil imports, sinceworld oil price times the equilibrium quantity of importsDG Quantity of Gasoline Figure 3: Social Cost of Higher Oil

Rausser, Gordon C.; Adams, Gregory D.; Montgomery, W. David; Smith, Anne E.

2002-01-01T23:59:59.000Z

257

The social costs of an MTBE ban in California (Long version)  

E-Print Network (OSTI)

an equivalent quantity (in energy terms), oil imports, sinceQuantity of Gasoline Figure 3: Social Cost of Higher Oil Importsworld oil price times the equilibrium quantity of imports

Rausser, Gordon C.; Adams, Gregory D.; Montgomery, W. David; Smith, Anne E.

2002-01-01T23:59:59.000Z

258

Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements  

SciTech Connect

This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

Custer, W.R. Jr.; Messick, C.D.

1996-03-31T23:59:59.000Z

259

Advanced Fuel Cycle Cost Basis  

SciTech Connect

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2009-12-01T23:59:59.000Z

260

Advanced Fuel Cycle Cost Basis  

SciTech Connect

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

2008-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Advanced Fuel Cycle Cost Basis  

SciTech Connect

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

2007-04-01T23:59:59.000Z

262

Modeling Photovoltaic and Concentrating Solar Power Trough Performance, Cost, and Financing with Solar Advisor Model  

DOE Green Energy (OSTI)

A comprehensive solar technology systems analysis model, the Solar Advisor Model (SAM), has been developed to support the federal R&D community and the solar industry by staff at the National Renewable Energy Laboratory (NREL) and Sandia National Laboratory. This model is able to model the finances, incentives, and performance of flat-plate photovoltaic (PV), concentrating PV, and concentrating solar power (specifically, parabolic troughs). The primary function of the model is to allow users to investigate the impact of variations in performance, cost, and financial parameters to better understand their impact on key figures of merit. Figures of merit related to the cost and performance of these systems include, but aren't limited to, system output, system efficiencies, levelized cost of energy, return on investment, and system capital and O&M costs. SAM allows users to do complex system modeling with an intuitive graphical user interface (GUI). In fact, all tables and graphics for this paper are taken directly from the model GUI. This model has the capability to compare different solar technologies within the same interface, making use of similar cost and finance assumptions. Additionally, the ability to do parametric and sensitivity analysis is central to this model. There are several models within SAM to model the performance of photovoltaic modules and inverters. This paper presents an overview of each PV and inverter model, introduces a new generic model, and briefly discusses the concentrating solar power (CSP) parabolic trough model. A comparison of results using the different PV and inverter models is also presented.

Blair, N.; Mehos, M.; Christensen, C.; Cameron, C.

2008-01-01T23:59:59.000Z

263

Realistic costs of carbon capture  

Science Conference Proceedings (OSTI)

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

Al Juaied, Mohammed (Harvard Univ., Cambridge, MA (US). Belfer Center for Science and International Affiaris); Whitmore, Adam (Hydrogen Energy International Ltd., Weybridge (GB))

2009-07-01T23:59:59.000Z

264

OVERVIEW OF ASSESSMENT PROBLEM FORMULATION 149 Figure 4.19 Stilling well at Bellevue flow monitoring Figure 4.20 Level recorder at Bellevue flow monitor  

E-Print Network (OSTI)

, which is heavily canopied along most of its length, can be considered light-limited. Maximum fish growth, Corvallis Environ mental Research Laboratory, Corvallis, OR. 1982.) #12;154 STORMWATER EFFECTS HANDBOOK, while the street dirt PAHs are from petroleum product spills. In August of 1980, ash from the eruption

Pitt, Robert E.

265

Lower Cost CPV 3-Sun Mirror Modules  

SciTech Connect

In a series of patent applications filed between 2002 and 2005, JX Crystals Inc described a evolutionary lower-cost low-concentration planar solar photovoltaic module that uses multiple linear rows of silicon cells and standard one-sun circuit laminations incorporating glass and EVA weather proofing encapsulations. The three novel features that we described are interdependent and integrated together to yield lower cost PV modules. These 3 novel features are: (1) The use of rows of linear mirrors or linear Fresnel lenses aligned with the cell rows and concentrating the sunlight onto the cell rows. (2) The addition of a thin aluminum sheet heat spreader on the back of the circuit lamination to spread the heat away from the cell rows so that the cell operating temperature remains acceptably low. (3) The incorporation of slots in the back of the aluminum sheet heat spreader to accommodate the differences in thermal expansion between the silicon cells, the glass, and the aluminum so that the circuit interconnectivity is maintained over time. Various embodiments of this planar linear concentrator panel are shown in figures 1 to 5. Figures 1 and 2 show the original planar linear concentrator module concept from July of 2002 with either mirrors (figure 1) or linear Fresnel lenses (figure 2). The idea was expanded in 2003 with the idea of an aluminum sheet heat spreader added to the back of a standard PV circuit lamination as shown in figure 3. In 2003, we also transitioned from half cells to third cells using SunPower cells as shown in figure 4. JX Crystals Inc then received funding for the 3-sun PV mirror module concept from the Shanghai Science and Technology Commission in 2003 and from the Shanghai Flower Port and the Shanghai Import and Export Trading Company in 2005. This funding led to a 800 panel pilot production run of our JX Crystals designed 3-sun module in 2006. 672 of these panels were installed in a 100 kW demonstration and an additional 24 panels were installed in a second 4 kW demonstration both at the Flower Port in Shanghai. Both of these systems were completed in 2006. Our 3-sun PV Panel concept has been described previously (see references 1, 2, & 3 available at www.jxcrystals.com under publication tab). We are now interested in bringing this potentially lower cost 3-sun technology back to the US. For any new technology, three issues need to be addressed. They are performance, durability, and cost. These topics are addressed in the next 3 sections.

Fraas, Dr. Lewis [JX Crystals, Inc.; Avery, James E. [JX Crystals, Inc.; Minkin, Leonid M [ORNL; Huang, H, [JX Crystals, Inc.; Gehl, Anthony C [ORNL; Maxey, L Curt [ORNL

2007-01-01T23:59:59.000Z

266

2010 Cost of Wind Energy Review  

DOE Green Energy (OSTI)

This document provides a detailed description of NREL's levelized cost of wind energy equation, assumptions and results in 2010, including historical cost trends and future projections for land-based and offshore utility-scale wind.

Tegen, S.; Hand, M.; Maples, B.; Lantz, E.; Schwabe, P.; Smith, A.

2012-04-01T23:59:59.000Z

267

OVERVIEW OF ASSESSMENT PROBLEM FORMULATION 199 Figure 4.44 Five-Mile Creek SSO discharge during Figure 4.45 Five-Mile Creek under normal flow  

E-Print Network (OSTI)

for a significant portion of the dry-weather * Color figures follow page 370. #12;200 STORMWATER EFFECTS HANDBOOK-diameter plastic pipes (with coarse screening on the ends) for protection and anchored in the streams. Bags were

Pitt, Robert E.

268

PAFC Cost Challenges  

NLE Websites -- All DOE Office Websites (Extended Search)

PAFC Cost Challenges Sridhar Kanuri Manager, PAFC Technology *Sridhar.Kanuri@utcpower.com 2 AGENDA Purecell 400 cost challenge Cost reduction opportunities Summary 3 PURECELL ...

269

Figure 1.8 Motor Vehicle Fuel Economy, 1973-2011 (Miles per Gallon)  

U.S. Energy Information Administration (EIA)

Figure 1.8 Motor Vehicle Fuel Economy, 1973-2011 (Miles per Gallon) U.S. Energy Information Administration / Monthly Energy Review August 2013 17

270

Figure 4.16 Offshore Wind Resources - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Figure 4.16 Offshore Wind Resources U.S. Energy Information Administration / Annual Energy Review 2011 123 Notes: • Data are annual average wind speed at 90 meters.

271

Figure 2. Stratigraphic Summary of Ages, Names and Rock Types in ...  

U.S. Energy Information Administration (EIA)

Figure 2. Stratigraphic Summary of Ages, Names and Rock Types in the ANWR 1002 and Coastal Plain Area of the Alaska North Slope. Potentially Productive ...

272

Figure 102. U.S. motor gasoline and diesel fuel consumption ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 102. U.S. motor gasoline and diesel fuel consumption, 2000-2040 (million barrels per day) Motor Gasoline Petroleum Portion ...

273

Figure 52. Energy use per capita and per dollar of gross ...  

U.S. Energy Information Administration (EIA)

Title: Figure 52. Energy use per capita and per dollar of gross domestic product, 1980-2040 (index, 1980 = 1) Subject: Annual Energy Outlook 2013

274

Figure 9.1 Nuclear Generating Units - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Figure 9.1 Nuclear Generating Units Operable Units,1 1957-2011 Nuclear Net Summer Capacity Change, 1950-2011 Status of All Nuclear Generating Units, ...

275

Figure SR1. Flow of Natural Gas Imports and Exports, 2009  

U.S. Energy Information Administration (EIA)

Figure SR1 of the U.S. Natural Gas Imports & Exports: 2009. This report provides an overview of U.S. international natural gas trade in 2009. ...

276

Figure 9.4 Natural Gas Prices (Dollarsa per Thousand Cubic Feet)  

U.S. Energy Information Administration (EIA)

Figure 9.4 Natural Gas Prices (Dollarsa per Thousand Cubic Feet) Wellhead and Citygate, 1949–2012 Consuming Sectors, 1967–2012 Consuming Sectors, Monthly

277

Grain Transportation Report Figure 11 | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

erre.bahizi@ams.usda.gov Unique Identifier USDA-5241 Public Access Level public Data Dictionary Data Download URL http:www.ams.usda.govAMSv1.0getfile?dDocNameSTELPRDC5084403...

278

Grain Transportation Report Figure 10 | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

erre.bahizi@ams.usda.gov Unique Identifier USDA-5240 Public Access Level public Data Dictionary Data Download URL http:www.ams.usda.govAMSv1.0getfile?dDocNameSTELPRDC5084416...

279

Software Cost Estimation and Control  

E-Print Network (OSTI)

this report, provided that the source of such material is fully acknowledged. Additional copies are available free of charge from: Publication Office Institute for Information Technology National Research Council of Canada Ottawa, Ontario, Canada K1A 0R6 Copyright 1994 par Conseil national de recherches du Canada Il est permis de citer de courts extraits et de reproduire des figures ou tableaux du présent rapport, ŕ condition d'en identifier clairement la source. Des exemplaires supplémentaires peuvent ętre obtenus gratuitement ŕ l'addresse suivante: Bureau des publications Institut de technologie de l'information Conseil national de recherches du Canada Ottawa (Ontario) Canada K1A 0R6 Software Cost Estimation 1 Table of Contents

M. R. Vigder; A.W. Kark

1994-01-01T23:59:59.000Z

280

Incorporating psychological influences in probabilistic cost analysis  

E-Print Network (OSTI)

Press, New York, 1981. MIL-HDBK-881, Handbook Work BreakdownWBS level-3 cost elements [MIL- HDBK-881, 1998]. In general,

Kujawski, Edouard; Alvaro, Mariana; Edwards, William

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Minimum Changeover Cost Arborescence  

E-Print Network (OSTI)

having minimum changeover cost, a cost that we now describe. ... We define the changeover cost at j, denoted by d(j), as the sum of the costs at j paid for each of  ...

282

Load-curve responsiveness to weather and the cost-effectiveness of conservation  

SciTech Connect

A cost-benefit analysis of home-weatherization projects using average incremental power costs instead of peak or off-peak costs shows that some programs are no longer cost-effective. Weatherization improves the energy efficiency of houses and reduces demand on the utility, but a study of how monthly load curves at a Pacific Northwest utility responded to weather over a 12-month period indicates that abnormal weather shifts the entire load curve. 1 figure. (DCK)

Hellman, M.M.

1982-09-30T23:59:59.000Z

283

Unit costs of waste management operations  

SciTech Connect

This report provides estimates of generic costs for the management, disposal, and surveillance of various waste types, from the time they are generated to the end of their institutional control. Costs include monitoring and surveillance costs required after waste disposal. Available data on costs for the treatment, storage, disposal, and transportation of spent nuclear fuel and high-level radioactive, low-level radioactive, transuranic radioactive, hazardous, mixed (low-level radioactive plus hazardous), and sanitary wastes are presented. The costs cover all major elements that contribute to the total system life-cycle (i.e., ``cradle to grave``) cost for each waste type. This total cost is the sum of fixed and variable cost components. Variable costs are affected by operating rates and throughput capacities and vary in direct proportion to changes in the level of activity. Fixed costs remain constant regardless of changes in the amount of waste, operating rates, or throughput capacities. Key factors that influence cost, such as the size and throughput capacity of facilities, are identified. In many cases, ranges of values for the key variables are presented. For some waste types, the planned or estimated costs for storage and disposal, projected to the year 2000, are presented as graphics.

Kisieleski, W.E.; Folga, S.M.; Gillette, J.L.; Buehring, W.A.

1994-04-01T23:59:59.000Z

284

Effect of phonon confinement on the thermoelectric figure of merit of quantum wells  

E-Print Network (OSTI)

Effect of phonon confinement on the thermoelectric figure of merit of quantum wells Alexander in quantum wells and superlattices due to two-dimensional carrier confinement. We predict that the figure of merit can increase even further in quantum well structures with free-surface or rigid boundaries

285

Figure 1:Energy Consumption in USg gy p 1E Roberts, Energy in US  

E-Print Network (OSTI)

: High Voltage DC Charging of fa Nissan Leaf. E Roberts, Energy in US 53 NPC Future Transportation FuelsFigure 1:Energy Consumption in USg gy p 2008 1E Roberts, Energy in US Source: www.eia.gov #12;Figure 2: US Liquid Demand by Sector and Fuel 2E Roberts, Energy in US Source: EIA: Annual Energy Outlook

Sutton, Michael

286

Real-time motion effect enhancement based on fluid dynamics in figure animation  

Science Conference Proceedings (OSTI)

In fast figure animation, motion blur is often employed to generate fantastic effects of figure motion, for exaggerating the atmosphere one wants to convey. In the previous works for long time, the solution based on certain kind of image blending in ... Keywords: GPU geometric processing, fluid dynamics, motion blur, skeletal animation

Tian-Chen Xu; En-Hua Wu; Mo Chen; Ming Xie

2011-12-01T23:59:59.000Z

287

lthough some national figures show that the number of women  

E-Print Network (OSTI)

point out. That theory appears to be borne out by a review of the areas in which women enroll in biodiesel characterization and reactor design; and students from the Vander- bilt Biodiesel Initiative government the responsibility of ensuring the safe disposal of high-level nuclear waste for one mil- lion

Bordenstein, Seth

288

Electric power substation capital costs  

SciTech Connect

The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

Dagle, J.E.; Brown, D.R.

1997-12-01T23:59:59.000Z

289

Costs of Oil Dependence: A 2000 Update  

NLE Websites -- All DOE Office Websites (Extended Search)

RNL RNL / TM -2000/ 152 Cos t s of O il D e pe nde nce : A 2000 Updat e David L. Greene Oak Ridge National Laboratory Nataliya I. Tishchishyna University of Tennessee May 2000 Prepared by the OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831 managed by UT-BATTELLE, LLC for the U. S. DEPARTMENT OF ENERGY under contract DE-AC05-00OR22725 iii TA BL E O F CO NTENTS LIST OF FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v LIST OF TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v ACKNOWLEDGMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii ABSTRACT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix 1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. COST COMPONENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

290

Cost Study Manual  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

28, 2012 28, 2012 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a percent of payroll exceeds the comparator group by more than five percent. For example, if per capita benefit costs for the comparator group are $10,000 and the benefit costs as a percent of payroll for the comparator group are 20%, the threshold for the contractor's benefits as a

291

Liquefaction and Pipeline Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

factors add 20 percent to liquefaction plant total installed cost 6 Distribution Pipeline Costs Collected historical Oil & Gas Journal data, and surveyed for current urban and...

292

Figure 71. Average fuel economy of new light-duty vehicles, 1980 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 71. Average fuel economy of new light-duty vehicles, 1980-2040 (miles per gallon, CAFE compliance values) History Reference case

293

Figure 91. Natural gas production by source, 1990-2040 (trillion ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 91. Natural gas production by source, 1990-2040 (trillion cubic feet) Alaska Coalbed Methane Lower 48 Offshore Lower 48 Onshore Conventional

294

Figure 1. Net import share of U.S. liquids supply in two ...  

U.S. Energy Information Administration (EIA)

16.87 2040.00 11.96 18.95 18.08 16.80. Title: Figure 1. Net import share of U.S. liquids supply in two cases, 1970-2040 (percent) Subject: Annual ...

295

Figure 41. U.S. Brent crude oil and Henry Hub natural gas spot ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 41. U.S. Brent crude oil and Henry Hub natural gas spot market prices in three cases, 2005-2040 Natural Gas Crude Oil Reference

296

Figure 98. API gravity of U.S. domestic and imported crude ...  

U.S. Energy Information Administration (EIA)

Title: Figure 98. API gravity of U.S. domestic and imported crude oil supplies, 1990-2040 (degrees) Subject: Annual Energy Outlook 2013 Author: U.S. E ...

297

Figure 97. Total U.S. tight oil production by geologic formation ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 97. Total U.S. tight oil production by geologic formation, 2011-2040 (million barrels per day) Permian Basin Bakken Eagle Ford

298

Mobility of Ions in Lanthanum Fluoride Nanoclusters---Figure 7 - TMS  

Science Conference Proceedings (OSTI)

... April 1997 edition of JOM-e. a, b. c, d. e, f. g, h. F (bulk) F (surface). La (bulk) La (surface). Figure 7. The MSD as a function of time for several temperatures.

299

Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 (thousand miles) History Reference case 1970.00 $8.69 1971.00 $9.01

300

Figure 10. Annual change in U.S. wet natural gas proved reserves ...  

U.S. Energy Information Administration (EIA)

Figure 8 Bcf Shale Total Other Shale % Total Proved Reserves Change in Natural Gas Proved Reserves Tcf Natural Gas Proved Reserves shale other 2006.00 14182.00

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Figure 11. Shale gas proved reserves by selected states, wet after ...  

U.S. Energy Information Administration (EIA)

Figure 11 Shale_History_Summary state Alabama AL Arkansas AR CA Colorado CO Kentucky KY Louisiana LA Michigan MI Montana MT North Dakota ND NM Oklahoma OK Pennsylvania

302

Figure 21. Annual average spot price for Brent crude oil in three ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 21. Annual average spot price for Brent crude oil in three cases, 1990-2040 (2011 dollars per barrel) Reference Low Oil Price

303

Figure 87. Ratio of Brent crude oil price to Henry Hub spot ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 87. Ratio of Brent crude oil price to Henry Hub spot natural gas price in energy-equivalent terms, 1990-2040 Ratio Released:April 15, 2013

304

Figure 49. Brent crude oil spot prices in three cases, 1990-2040 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 49. Brent crude oil spot prices in three cases, 1990-2040 (2011 dollars per barrel) Reference High Oil Price Low Oil Price

305

Figure 3.1 Fossil Fuel Production Prices - U.S. Energy ...  

U.S. Energy Information Administration (EIA)

Figure 3.1 Fossil Fuel Production Prices Prices, 1949-2011 Fossil Fuel Composite Price,˛ Change From Previous Year, 1950-2011 68 U.S. Energy Information ...

306

Figure 3.8 Value of Fossil Fuel Exports - U.S. Energy ...  

U.S. Energy Information Administration (EIA)

Figure 3.8 Value of Fossil Fuel Exports Total, 1949-2011 By Fuel, 1949-2011 By Fuel, 2011 82 U.S. Energy Information Administration / Annual Energy Review 2011

307

Figure 7. U.S. dry natural gas consumption by sector, 2005-2040 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 7. U.S. dry natural gas consumption by sector, 2005-2040 (trllion cubic feet) Residential Commercial Transportation Gas to liquids

308

Figure 75. U.S. electricity demand growth, 1950-2040 (percent, 3 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 75. U.S. electricity demand growth, 1950-2040 (percent, 3-year moving average) Year 3-year moving average Trendline 1950.00

309

Figure 6.3 Natural Gas Imports, Exports, and Net Imports  

U.S. Energy Information Administration (EIA)

Figure 6.3 Natural Gas Imports, Exports, and Net Imports Trade Overview, 1949-2011 Trade, 2011 Net Imports as Share of Consumption, 1958-2011 182 U.S. ...

310

Figure SR3. U.S. Natural Gas Imports and Exports, 1994-2008  

U.S. Energy Information Administration (EIA)

Figure SR3 of the U.S. Natural Gas Imports & Exports: 2008. This report provides an overview of U.S. international natural gas trade in 2008. Natu ...

311

Figure 8.1 Electricity Overview - U.S. Energy Information ...  

U.S. Energy Information Administration (EIA)

Figure 8.1 Electricity Overview Overview, 2011 Electricity Trade, 1949-2011 Net-Generation-to-End-Use Flow, 2011 (Billion Kilowatthours) 220 U.S. Energy Information ...

312

Figure SR1. Flow of Natural Gas Imports and Exports, 2008  

U.S. Energy Information Administration (EIA)

Figure SR1 of the U.S. Natural Gas Imports & Exports: 2008. ... In 2008 LNG exports went primarily to Japan, after a small amount went to Russia in 2007.

313

Highly Insulating Windows - Cost  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost Cost The following is an estimate of the cost effective incremental cost of highly-insulating windows (U-factor=0.20 Btu/hr-ft2-F) compared to regular ENERGY STAR windows (U-factor 0.35 Btu/hr-ft2-F). Energy savings from lower U-factors were simulated with RESFEN over an assumed useful window life of 25 years. To determine the maximum incremental cost at which highly-insulating windows would still be cost-effective, we used a formula used by many utility companies to calculate the cost of saved energy from energy efficiency programs, based on the programs' cost and savings. We turned this formula around so that the cost of saved energy equals the present energy prices in the studied locations, whereas the program cost (the incremental cost of the windows) is the dependent variable. By entering 5%

314

Transparent Cost Database | Transparent Cost Database  

Open Energy Info (EERE)

Hide data for this chart (-)Show data for this chart (+) Loading data... Transparent Cost Database Generation Showing: Historical Projections Year Published: Release mouse to...

315

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating Procedures INDEPENDENT COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) Standard Operating...

316

Early Station Costs Questionnaire  

NLE Websites -- All DOE Office Websites (Extended Search)

Early Station Costs Questionnaire Early Station Costs Questionnaire Marc Melaina Hydrogen Technologies and Systems Center Market Readiness Workshop February 16-17th, 2011 Washington, DC Questionnaire Goals * The Early Station Costs questionnaire provides an anonymous mechanism for organizations with direct experience with hydrogen station costs to provide feedback on current costs, near-term costs, economies of scale, and R&D priorities. * This feedback serves the hydrogen community and government agencies by increasing awareness of the status of refueling infrastructure costs National Renewable Energy Laboratory Innovation for Our Energy Future Questions for Market Readiness Workshop Attendees * Are these questions the right ones to be asking?

317

GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GAO Cost Estimating and Assessment Guide GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process Step Description Associated task 1 Define estimate's purpose Determine estimate's purpose, required level of detail, and overall scope; Determine who will receive the estimate 2 Develop estimating plan Determine the cost estimating team and develop its master schedule; Determine who will do the independent cost estimate; Outline the cost estimating approach; Develop the estimate timeline 3 Define program characteristics In a technical baseline description document, identify the program's

318

Low Cost, Durable Seal  

NLE Websites -- All DOE Office Websites (Extended Search)

Cost, Durable Seal Cost, Durable Seal George M. Roberts UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * Technical Approach * Timeline * Team Roles * Budget * Q&A 2 LOW COST, DURABLE SEAL Project Objective Develop advanced, low cost, durable seal materials and sealing techniques amenable to high volume manufacture of PEM cell stacks. DOE Targets/Goals/Objectives Project Goal Durability Transportation: 5,000 hr Stationary: 40,000 hr Durability Improve mechanical and chemical stability to achieve 40,000 hr of useful operating life. Low Cost Low Cost A material cost equivalent to or less than the cost of silicones in common use. 3 LOW COST, DURABLE SEAL

319

Cost reduction through improved seismic design  

SciTech Connect

During the past decade, many significnt seismic technology developments have been accomplished by the United States Department of Energy (USDOE) programs. Both base technology and major projects, such as the Fast Flux Test Facility (FFTF) and the Clinch River Breeder Reactor (CRBR) plant, have contributed to seismic technology development and validation. Improvements have come in the areas of ground motion definitions, soil-structure interaction, and structural analysis methods and criteria for piping, equipment, components, reactor core, and vessels. Examples of some of these lessons learned and technology developments are provided. Then, the highest priority seismic technology needs, achievable through DOE actions and sponsorship are identified and discussed. Satisfaction of these needs are expected to make important contributions toward cost avoidances and reduced capital costs of future liquid metal nuclear plants. 23 references, 12 figures.

Severud, L.K.

1984-01-01T23:59:59.000Z

320

OOTW COST TOOLS  

Science Conference Proceedings (OSTI)

This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

HARTLEY, D.S.III; PACKARD, S.L.

1998-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

PHENIX WBS notes. Cost and schedule review copy  

Science Conference Proceedings (OSTI)

The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds are shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.

Not Available

1994-02-01T23:59:59.000Z

322

PHENIX Work Breakdown Structure. Cost and schedule review copy  

Science Conference Proceedings (OSTI)

The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for building the PHENIX detector. All costs in the WBS book are shown in FY 1993 dollars. Also shown are the institutional and foreign contributions, the level of pre-operations funding, and the cost of deferred items. Pie charts are presented at PHENIX WBS level 1 and 2 that show this information. The PHENIX construction funds are shown broken down to PHENIX WBS level 3 items per fiscal year, and the resulting profile is compared to the RHIC target profile. An accumulated difference of the two profiles is also shown. The PHENIX global construction schedule is presented at the end of the Overview section. Following the Overview are sections for each subsystem. Each subsystem section begins with a summary cost estimate, cost profile, and critical path. The total level 3 cost is broken down into fixed costs (M&S), engineering costs (EDIA) and labor costs. Costs are further broken down in terms of PHENIX construction funds, institutional and foreign contributions, pre-operations funding, and deferred items. Also shown is the contingency at level 3 and the level 4 breakdown of the total cost. The cost profile in fiscal years is shown at level 3. The subsystem summaries are followed by the full cost estimate and schedule sheets for that subsystem. These detailed sheets are typically carried down to level 7 or 8. The cost estimate shows Total, M&S, EDIA, and Labor breakdowns, as well as contingency, for each WBS entry.

Not Available

1994-02-01T23:59:59.000Z

323

Full Economic Costing:-Updated guidance notes for peer reviewers  

E-Print Network (OSTI)

the level of resources required to undertake the project and not their unit cost. In particular, peer are as follows: 1) Directly Incurred costs: These are costs which are specific to a project and will be charged to the project on the basis of actual costs incurred. They must be supported by an audit record, which

324

Defense waste transportation: cost and logistics studies  

SciTech Connect

Transportation of nuclear wastes from defense programs is expected to significantly increase in the 1980s and 1990s as permanent waste disposal facilities come into operation. This report uses models of the defense waste transportation system to quantify potential transportation requirements for treated and untreated contact-handled transuranic (CH-TRU) wastes and high-level defense wastes (HLDW). Alternative waste management strategies in repository siting, waste retrieval and treatment, treatment facility siting, waste packaging and transportation system configurations were examined to determine their effect on transportation cost and hardware requirements. All cost estimates used 1980 costs. No adjustments were made for future changes in these costs relative to inflation. All costs are reported in 1980 dollars. If a single repository is used for defense wastes, transportation costs for CH-TRU waste currently in surface storage and similar wastes expected to be generated by the year 2000 were estimated to be 109 million dollars. Recovery and transport of the larger buried volumes of CH-TRU waste will increase CH-TRU waste transportation costs by a factor of 70. Emphasis of truck transportation and siting of multiple repositories would reduce CH-TRU transportation costs. Transportation of HLDW to repositories for 25 years beginning in 1997 is estimated to cost $229 M in 1980 costs and dollars. HLDW transportation costs could either increase or decrease with the selection of a final canister configuration. HLDW transportation costs are reduced when multiple repositories exist and emphasis is placed on truck transport.

Andrews, W.B.; Cole, B.M.; Engel, R.L.; Oylear, J.M.

1982-08-01T23:59:59.000Z

325

Figure 1  

Science Conference Proceedings (OSTI)

Total = $759.2 billion. Source: Organisation for Economic Co-Operation and Development (OECD), Main Science and Technology Indicators, 2004. * Argentina ...

326

Figure 3  

Science Conference Proceedings (OSTI)

skip to main content, National Institute of Standards and Technology. Home, Instruments, Science, Experiments, SiteMap. Back ...

327

Figure 2  

Science Conference Proceedings (OSTI)

skip to main content, National Institute of Standards and Technology. Home, Instruments, Science, Experiments, SiteMap. Back ...

328

Figure 1  

Science Conference Proceedings (OSTI)

skip to main content, National Institute of Standards and Technology. Home, Instruments, Science, Experiments, SiteMap. Back ...

329

Operations Cost Allocation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

330

Minimum Cost Arborescences ?  

E-Print Network (OSTI)

In this paper, we analyze the cost allocation problem when a group of agents or nodes have to be connected to a source, and where the cost matrix describing the cost of connecting each pair of agents is not necessarily symmetric, thus extending the well-studied problem of minimum cost spanning tree games, where the costs are assumed to be symmetric. The focus is on rules which satisfy axioms representing incentive and fairness properties. We show that while some results are similar, there are also significant differences between the frameworks corresponding to symmetric and asymmetric cost matrices.

Bhaskar Dutta; Debasis Mishra; We Thank Daniel Granot; Anirban Kar; Herve Moulin For Comments

2011-01-01T23:59:59.000Z

331

Nuclear fuel cycle costs  

Science Conference Proceedings (OSTI)

The costs for the back-end of the nuclear fuel cycle, which were developed as part of the Nonproliferation Alternative Systems Assessment Program (NASAP), are presented. Total fuel cycle costs are given for the pressurized water reactor once-through and fuel recycle systems, and for the liquid-metal fast breeder reactor system. These calculations show that fuel cycle costs are a small part of the total power costs. For breeder reactors, fuel cycle costs are about half that of the present once-through system. The total power cost of the breeder reactor system is greater than that of light-water reactor at today's prices for uranium and enrichment.

Burch, W.D.; Haire, M.J.; Rainey, R.H.

1982-02-01T23:59:59.000Z

332

Hydrogen Threshold Cost Calculation  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Record (Offices of Fuel Cell Technologies) Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing vehicles [gasoline in hybrid-electric vehicles (HEVs)] in 2020. This record documents the methodology and assumptions used to calculate that threshold cost. Principles: The cost threshold analysis is a "top-down" analysis of the cost at which hydrogen would be

333

Hydrogen Pathway Cost Distributions  

NLE Websites -- All DOE Office Websites (Extended Search)

Pathway Cost Distributions Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric hybrids are benchmarks * R&D guidance provided in two forms * Evolved gasoline ICE defines a threshold hydrogen cost used to screen or eliminate options which can't show ability to meet target * Gasoline-electric hybrid defines a lower hydrogen cost used to prioritize projects for resource allocation

334

Reduce Oil Dependence Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Reduce Oil Dependence Costs U.S. Petroleum Use, 1970-2010 Nearly 40% of the oil we use is imported, costing us roughly 300 billion annually. Increased domestic oil production from...

335

Documents: Cost Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis Search Documents: Search PDF Documents View a list of all documents Cost Analysis PDF Icon Summary of the Cost Analysis Report for the Long-term Management of Depleted UF6...

336

Chemical Lifecycle Management Cost  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemical Lifecycle Management Cost Presented by: J.M. Hieb, CH2M HILL Plateau Remediation Company CHPRC1204-04 Chemical Lifecycle Management Cost Everyone is trying to stretch a...

337

Cost Estimation Recommendations  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

338

Automatic monitoring helps reduce lighting costs  

SciTech Connect

A Benton, Arkansas utility is using a dimmable ballast system to curb high-intensity-discharge (HID) lighting costs. The system also incorpoates a monitoring control system. This control automatically maintains minimum illumination levels.

1978-11-01T23:59:59.000Z

339

Power Plant Cycling Costs  

Science Conference Proceedings (OSTI)

This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

2012-07-01T23:59:59.000Z

340

Analytic framework for TRL-based cost and schedule models  

E-Print Network (OSTI)

Many government agencies have adopted the Technology Readiness Level (TRL) scale to help improve technology development management under ever increasing cost, schedule, and complexity constraints. Many TRL-based cost and ...

El-Khoury, Bernard

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Parameter inference of cost-sensitive boosting algorithms  

Science Conference Proceedings (OSTI)

Several cost-sensitive boosting algorithms have been reported as effective methods in dealing with class imbalance problem. Misclassification costs, which reflect the different level of class identification importance, are integrated into the weight ...

Yanmin Sun; A. K. C. Wong; Yang Wang

2005-07-01T23:59:59.000Z

342

Experimental Setup Measurements were made with the experimental configuration depicted in Figure 1. Tissue  

E-Print Network (OSTI)

depicted in Figure 1. Tissue samples were heated in an insulated tank that was filled with deionized water, which had been degassed by vacuum pumping in an appropriate vessel. Tissue was placed with a MetroTek pulser and echoes recorded. The transducer was moved to the next site of interest and a new

Arthur, R. Martin

343

AMS Copyright Notice Copyright 2010 American Meteorological Society (AMS). Permission to use figures,  

E-Print Network (OSTI)

-state vertical wind shear. The present work addresses a related assertion, that squall-line intensity ought, long-lived squall lines'' (often called ``RKW theory'') represented a paradigm shift. Although a number figures, tables, and brief excerpts from this work in scientific and educational works is hereby granted

Parker, Matthew D. Brown

344

AMS Copyright Notice Copyright 2004 American Meteorological Society (AMS). Permission to use figures,  

E-Print Network (OSTI)

with inflow passing through their line-leading precipitation can be stable and long lived. Lower figures, tables, and brief excerpts from this work in scientific and educational works is hereby granted provided that the source is acknowledged. Any use of material in this work that is determined to be "fair

Parker, Matthew D. Brown

345

Thermoelectric figure of merit for bulk nanostructured composites with distributed parameters  

Science Conference Proceedings (OSTI)

The effective properties of composites whose structure includes nanocontacts between bulk-phase macrocrystallites are considered. A model for such a nanostructured composite is constructed. Effective values of the thermoelectric power, thermal and electrical conductivities, and thermoelectric figure of merit are calculated in the mean-field approximation.

Snarskii, A. A. [National Technical University 'Kyiv Polytechnic Institute' (Ukraine); Sarychev, A. K. [Russian Academy of Sciences, Institute for Theoretical and Applied Electromagnetics (Russian Federation); Bezsudnov, I. V., E-mail: biv@akuan.ru ['Nauka-Service' Scientific and Production Company (Russian Federation); Lagarkov, A. N. [Russian Academy of Sciences, Institute for Theoretical and Applied Electromagnetics (Russian Federation)

2012-05-15T23:59:59.000Z

346

Data Sources for Figures ER2006-0227 C-1 April 2006  

E-Print Network (OSTI)

Appendix C Data Sources for Figures #12;#12;ER2006-0227 C-1 April 2006 Feature Data Source Laboratory, ENV­Environmental Remediation & Surveillance Program, ER2005-0496; 1:2,500 Scale Data; 22 Sept:2,500 Scale Data; 10 March 2006. Canyon Rim, Location of the, Townsite South Rim in 1991; in "Line Features

347

NEC's Itanium prototype server (see Figure 1), code-named AzusA after a river  

E-Print Network (OSTI)

aimed at reliability, availability, and serviceability. These features include cell hot- plug capability 200 ns for a local memory access or local CPU cache hit, and less than 300 ns for a remote (other cell. Availability As in PCI cards, a cell in a partitioned con- figuration can be hot swapped while other domains

Skadron, Kevin

348

NUCLEAR ENERGY SYSTEM COST MODELING  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy’s Fuel Cycle Technologies (FCT) Program is preparing to perform an evaluation of the full range of possible Nuclear Energy Systems (NES) in 2013. These include all practical combinations of fuels and transmuters (reactors and sub-critical systems) in single and multi-tier combinations of burners and breeders with no, partial, and full recycle. As part of this evaluation, Levelized Cost of Electricity at Equilibrium (LCAE) ranges for each representative system will be calculated. To facilitate the cost analyses, the 2009 Advanced Fuel Cycle Cost Basis Report is being amended to provide up-to-date cost data for each step in the fuel cycle, and a new analysis tool, NE-COST, has been developed. This paper explains the innovative “Island” approach used by NE-COST to streamline and simplify the economic analysis effort and provides examples of LCAE costs generated. The Island approach treats each transmuter (or target burner) and the associated fuel cycle facilities as a separate analysis module, allowing reuse of modules that appear frequently in the NES options list. For example, a number of options to be screened will include a once-through uranium oxide (UOX) fueled light water reactor (LWR). The UOX LWR may be standalone, or may be the first stage in a multi-stage system. Using the Island approach, the UOX LWR only needs to be modeled once and the module can then be reused on subsequent fuel cycles. NE-COST models the unit operations and life cycle costs associated with each step of the fuel cycle on each island. This includes three front-end options for supplying feedstock to fuel fabrication (mining/enrichment, reprocessing of used fuel from another island, and/or reprocessing of this island’s used fuel), along with the transmuter and back-end storage/disposal. Results of each island are combined based on the fractional energy generated by each islands in an equilibrium system. The cost analyses use the probability distributions of key parameters and employs Monte Carlo sampling to arrive at an island’s cost probability density function (PDF). When comparing two NES to determine delta cost, strongly correlated parameters can be cancelled out so that only the differences in the systems contribute to the relative cost PDFs. For example, one comparative analysis presented in the paper is a single stage LWR-UOX system versus a two-stage LWR-UOX to LWR-MOX system. In this case, the first stage of both systems is the same (but with different fractional energy generation), while the second stage of the UOX to MOX system uses the same type transmuter but the fuel type and feedstock sources are different. In this case, the cost difference between systems is driven by only the fuel cycle differences of the MOX stage.

Francesco Ganda; Brent Dixon

2012-09-01T23:59:59.000Z

349

NREL: Energy Analysis - Energy Technology Cost and Performance Data for  

NLE Websites -- All DOE Office Websites (Extended Search)

Bookmark and Share Bookmark and Share Energy Technology Cost and Performance Data for Distributed Generation Transparent Cost Database Button Recent cost estimates for distributed generation (DG) renewable energy technologies are available across capital costs, operations and maintenance (O&M) costs, and levelized cost of energy (LCOE). Use the tabs below to navigate the charts. The LCOE tab provides a simple calculator for both utility-scale and DG technologies that compares the combination of capital costs, O&M, performance, and fuel costs. If you are seeking utility-scale technology cost and performance estimates, please visit the Transparent Cost Database website for NREL's information regarding vehicles, biofuels, and electricity generation. Capital Cost (September 2013 Update)

350

Seismic Performance Assessment and Probabilistic Repair Cost Analysis of Precast Concrete Cladding Systems for Multistory Buildings  

E-Print Network (OSTI)

Costs (2009). The cost per square foot was determined fromcost for basement levels is given at $36.40 per square foot

Hunt, Jeffrey Patrick

2010-01-01T23:59:59.000Z

351

For appliances, choosing the most cost-effective option depends on ...  

U.S. Energy Information Administration (EIA)

Consumers in the market for new appliances have a wide range of choices that likely vary by cost, options, and efficiency level. If energy cost effectiveness is a ...

352

Commercial equipment cost database  

SciTech Connect

This report, prepared for DOE, Office of Codes and Standards, as part of the Commercial Equipment Standards Program at Pacific Northwest Laboratory, specifically addresses the equipment cost estimates used to evaluate the economic impacts of revised standards. A database including commercial equipment list prices and estimated contractor costs was developed, and through statistical modeling, estimated contractor costs are related to equipment parameters including performance. These models are then used to evaluate cost estimates developed by the ASHRAE 90.1 Standing Standards Project Committee, which is in the process of developing a revised ASHRAE 90.1 standard. The database will also be used to support further evaluation of the manufacturer and consumer impacts of standards. Cost estimates developed from the database will serve as inputs to economic modeling tools, which will be used to estimate these impacts. Preliminary results suggest that list pricing is a suitable measure from which to estimate contractor costs for commercial equipment. Models developed from these cost estimates accurately predict estimated costs. The models also confirm the expected relationships between equipment characteristics and cost. Cost models were developed for gas-fired and electric water heaters, gas-fired packaged boilers, and warm air furnaces for indoor installation. Because of industry concerns about the use of the data, information was not available for the other categories of EPAct-covered equipment. These concerns must be addressed to extend the analysis to all EPAct equipment categories.

Freeman, S.L.

1995-01-01T23:59:59.000Z

353

Low cost MCFC anodes  

DOE Green Energy (OSTI)

This paper outlines a project, funded under a DOE SBIR grant, which tested a potentially lower cost method of manufacturing MCFC stack anodes and evaluated the feasibility of using the technology in the existing M-C Power Corp. manufacturing facility. The procedure involves adding activator salts to the anode tape casting slurry with the Ni and Cr or Al powders. Two different processes occur during heat treatment in a reducing environment: sintering of the base Ni structure, and alloying or cementation of the Cr or Al powders. To determine whether it was cost-effective to implement the cementation alloying manufacturing process, the M-C Power manufacturing cost model was used to determine the impact of different material costs and processing parameters on total anode cost. Cost analysis included equipment expenditures and facility modifications required by the cementation alloying process.

Erickson, D.S.

1996-12-31T23:59:59.000Z

354

What solar heating costs  

SciTech Connect

Few people know why solar energy systems cost what they do. Designers and installers know what whole packages cost, but rarely how much goes to piping, how much for labor and how much for the collectors. Yet one stands a better chance of controlling costs if one can compare where the money is going against where it should be going. A detailed Tennessee Valley Authority study of large solar projects shows how much each component contributes to the total bill.

Adams, J.A.

1985-05-01T23:59:59.000Z

355

CAES Updated Cost Assessment  

Science Conference Proceedings (OSTI)

Compressed Air Energy Storage Systems (CAES) for bulk energy storage applications have been receiving renewed interest. Increased penetration of large quantities of intermittent wind generation are requiring utilities to re-examine the cost and value of CAES systems. New second generation CAES cycles have been identified which offer the potential for lower capital and operating costs. This project was undertaken to update and summarize the capital and operating costs and performance features of second ge...

2008-12-23T23:59:59.000Z

356

Cost Affordable Titanium IV  

Science Conference Proceedings (OSTI)

Jul 31, 2012 ... Enhancing the Cost Effectiveness of High Performance Titanium Alloy Component Production by Powder Metallurgy · Evolution of Texture in ...

357

Cost Effective Single Crystals  

Science Conference Proceedings (OSTI)

three relevant technologies, namely casting, alloy development and orientation measurement, developed by Rolls-Royce to enable the cost effective production.

358

Sharing Supermodular Costs  

E-Print Network (OSTI)

the costs collectively incurred by a group of cooperating agents. ..... Mixed integer programming formulations for production planning and scheduling prob- lems.

359

Petroleum well costs.  

E-Print Network (OSTI)

??This is the first academic study of well costs and drilling times for Australia?s petroleum producing basins, both onshore and offshore. I analyse a substantial… (more)

Leamon, Gregory Robert

2006-01-01T23:59:59.000Z

360

COST REVIEW and ESTIMATING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Programming Guide. OMB Circular A-94, Guidelines and Discount Rates for Benefit-Cost Analysis of Federal Programs, dated October 29, 1992 Page | 41 APPENDIX A ICRICE...

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

The Cost of Debt ?  

E-Print Network (OSTI)

We estimate firm-specific marginal cost of debt functions for a large panel of companies between 1980 and 2007. The marginal cost curves are identified by exogenous variation in the marginal tax benefits of debt. The location of a given company’s cost of debt function varies with characteristics such as asset collateral, size, book-to-market, asset tangibility, cash flows, and whether the firm pays dividends. By integrating the area between benefit and cost functions we estimate that the equilibrium net benefit of debt is 3.5 % of asset value, resulting from an estimated gross benefit of debt of 10.4 % of asset value and an estimated cost of debt of 6.9%. We find that the cost of being overlevered is asymmetrically higher than the cost of being underlevered and that expected default costs constitute approximately half of the total ex ante cost of debt. We thank Rick Green (the Acting Editor), and an anonymous referee, Heitor Almeida, Ravi Bansal,

Jules H. Van Binsbergen; John R. Graham; Jie Yang

2010-01-01T23:59:59.000Z

362

Reducing Energy Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy expense is becoming increasingly dominant in the operating costs of high-performance computing (HPC) systems. At the same time, electricity prices vary significantly at...

363

Target Cost Management Strategy  

E-Print Network (OSTI)

Target cost management (TCM) is an innovation of Japanese management accounting system and by common sense has been considered with great interest by practitioners. Nowadays, TCM related

Okano, Hiroshi

1996-01-01T23:59:59.000Z

364

Hydrogen and Infrastructure Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

FUEL CELL TECHNOLOGIES PROGRAM Hydrogen and Infrastructure Costs Hydrogen Infrastructure Market Readiness Workshop Washington D.C. February 17, 2011 Fred Joseck U.S. Department of...

365

Standardized Cost Structure for the Environmental Industry  

Science Conference Proceedings (OSTI)

The underlying key to developing successful estimates, tracking project costs, and utilizing historical project cost information is the development of standardized and well-defined hierarchical listing of cost categories. Committees within the U.S. Federal agencies have pioneered efforts toward developing the Environmental Cost Element Structure (ECES), which is key in achieving these goals. The ECES was developed using an iterative process with input from federal agencies and industry. Experts from several disciplines participated including engineers, cost estimators, project/program managers, and contract personnel. The ECES benefits from an intense analytical effort, the knowledge gained from the maturation of the environmental industry, and incorporation of past user's experiences. Building upon this foundation, the E06 committee of the ASTM International has now fully developed and published a standard (ASTM 2150-04) that provides standardized cost categories with complete cost category definitions. This standard affords environmental and nuclear D and D project managers the opportunity to have a well defined hierarchical listing of their estimates and actual costs, readily adapted to performing summations and roll-ups, supported by a multi-level dictionary specifically defining the content of the cost elements as well as the summations. Owing to the dynamic nature of the environmental technologies, efforts need to be made to continue to update this standard by adding new technologies and methods as they are developed and employed in the field. Lastly, the Environmental Cost Element Structure that is embodied in this standard also presents opportunities to develop historical cost databases and comprehensive life cycle cost estimates and standardized cost estimating tools. (authors)

Skokan, B.; Melamed, D.; Guevara, K. [US DOE, Office of Project Planning and Controls, EM-32, 1000 Independence Ave. SW, Washington, DC 20585 (United States); Mallick, P. [US DOE, Office of Performance Assessment, EM-43, 1000 Independence Ave. SW, Washington, DC 20585 (United States); Bierman, G. [Legin Group, Inc., P.O. Box 3788, Gaithersburg, MD 20885-3788 (United States); Marshall, H.E. [Building and Fire Research Laboratory, National Institute of Standards and Technology, 100 Bureau Drive, Stop 8603, Gaithersburg, MD 20899-8603 (United States)

2006-07-01T23:59:59.000Z

366

APT cost scaling: Preliminary indications from a Parametric Costing Model (PCM)  

Science Conference Proceedings (OSTI)

A Parametric Costing Model has been created and evaluate as a first step in quantitatively understanding important design options for the Accelerator Production of Tritium (APT) concept. This model couples key economic and technical elements of APT in a two-parameter search of beam energy and beam power that minimizes costs within a range of operating constraints. The costing and engineering depth of the Parametric Costing Model is minimal at the present {open_quotes}entry level{close_quotes}, and is intended only to demonstrate a potential for a more-detailed, cost-based integrating design tool. After describing the present basis of the Parametric Costing Model and giving an example of a single parametric scaling run derived therefrom, the impacts of choices related to resistive versus superconducting accelerator structures and cost of electricity versus plant availability ({open_quotes}load curve{close_quotes}) are reported. Areas of further development and application are suggested.

Krakowski, R.A.

1995-02-03T23:59:59.000Z

367

Develop nickel--zinc battery suitable for electric vehicle propulsion. Task A: design and cost study  

DOE Green Energy (OSTI)

A three-month design and cost study for the use of nickel--zinc batteries in electric vehicles is presented. Battery configuration is analyzed, and expected performance is set forth. Current development problems concern component materials and capacity decline on cycling, electrolyte maintenance, and thermal characteristics. The manufacturing process is outlined, and estimates are made for cost, materials requirements, capital needs, etc. 61 figures, 24 tables. (RWR)

None

1977-02-15T23:59:59.000Z

368

Cost and design study for electric vehicle lead--acid batteries  

SciTech Connect

A design and cost study for electric-vehicle lead--acid batteries is presented; a research and development program leading to demonstration and testing of 20- to 30-kWh batteries is proposed. Both flat pasted and tubular positive electrodes are included. Detailed testing programs are set forth. 110 figures, 8 tables (RWR)

1977-01-01T23:59:59.000Z

369

Costs and Returns Trends in the Gulf of Mexico Shrimp Industry, 197178  

E-Print Network (OSTI)

Costs and Returns Trends in the Gulf of Mexico Shrimp Industry, 1971·78 JOHN P. WARREN and WADE L. GRIFFIN Figure I.-Total U.S. Gulf of Mexico shrimp landings: Volume (million pounds), value (million dollars), average price (cents/pound), and days fished (thousands), 1956-77. The Gulf of Mexico Shrimp

370

Marginal cost of electricity 1980-1995: an approximation based on the cost of new coal and nuclear generating plants  

SciTech Connect

This report presents estimates of the costs of new coal and nuclear base-load generating capacity which is either currently under construction or planned by utilities to meet their load-growth expectations during the period from 1980 to 1995. These capacity cost estimates are used in conjunction with announced plant capacities and commercial-operation dates to develop state-level estimates of busbar costs of electricity. From these projected busbar costs, aggregated estimates of electricity costs at the retail level are developed for DOE Regions. The introductory chapter explains the rationale for using the cost of electricity from base-load plants to approximate the marginal cost of electricity. The next major section of the report outlines the methodology and major assumptions used. This is followed by a detailed description of the empirical analysis, including the equations used for each of the cost components. The fourth section presents the resultant marginal cost estimates.

Nieves, L.A.; Patton, W.P.; Harrer, B.J.; Emery, J.C.

1980-07-01T23:59:59.000Z

371

Federal Energy Management Program: Energy Cost Calculator for...  

NLE Websites -- All DOE Office Websites (Extended Search)

Urinals Vary water cost, frequency of operation, and or efficiency level. INPUT SECTION This calculator assumes that early replacement of a urinal or toilet will take place with...

372

Federal Energy Management Program: Energy Cost Calculator for...  

NLE Websites -- All DOE Office Websites (Extended Search)

Electric and Gas Water Heaters Vary equipment size, energy cost, hours of operation, and or efficiency level. INPUT SECTION Input the following data (if any parameter is missing,...

373

Computer modeling and experimental verification of figure-eight-shaped null-flux coil suspension system  

DOE Green Energy (OSTI)

This report discusses the computer modeling and experimental verification of the magnetic forces associated with a figure-eight-shaped null-flux coil suspension system. A set of computer codes called COILGDWY, were developed on the basis of the dynamic circuit model and verified by means of a laboratory model. The experimental verification was conducted with a rotating PVC drum, the surface of which held various types of figure-eight-shaped null-flux coils that interacted with a stationary permanent magnet. The transient and dynamic magnetic forces between the stationary magnet and the rotating conducting coils were measured and compared with results obtained from the computer model. Good agreement between the experimental results and computer simulations was obtained. The computer model can also be used to calculate magnetic forces in a large-scale magnetic-levitation system.

He, J.L.; Mulcahey, T.M.; Rote, D.M.; Kelly, T.

1994-12-01T23:59:59.000Z

374

Estimate Costs to Implement Greenhouse Gas Mitigation Strategies Using  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Costs to Implement Greenhouse Gas Mitigation Strategies Costs to Implement Greenhouse Gas Mitigation Strategies Using Renewable Energy in Buildings Estimate Costs to Implement Greenhouse Gas Mitigation Strategies Using Renewable Energy in Buildings October 7, 2013 - 11:25am Addthis After determining the best greenhouse gas (GHG) reduction strategies using renewable energy, a Federal agency should estimate the cost of implementing them in a building or buildings. There are several cost factors that need to be considered when developing a renewable energy project. Capital costs, fixed and variable operations and maintenance (O&M) costs and in the case of biomass and waste-to-energy projects, fuel costs all contribute to the total cost of operating a renewable energy system. The levelized system cost takes into account these

375

Building a market for small wind: The break-even turnkey cost of residential wind systems in the United States  

SciTech Connect

Although small wind turbine technology and economics have improved in recent years, the small wind market in the United States continues to be driven in large part by state incentives, such as cash rebates, favorable loan programs, and tax credits. This paper examines the state-by-state economic attractiveness of small residential wind systems. Economic attractiveness is evaluated primarily using the break-even turnkey cost (BTC) of a residential wind system as the figure of merit. The BTC is defined here as the aggregate installed cost of a small wind system that could be supported such that the system owner would break even (and receive a specified return on investment) over the life of the turbine, taking into account current available incentives, the wind resource, and the retail electricity rate offset by on-site generation. Based on the analysis presented in this paper, we conclude that: (1) the economics of residential, grid-connected small wind systems is highly variable by state and wind resource class, (2) significant cost reductions will be necessary to stimulate widespread market acceptance absent significant changes in the level of policy support, and (3) a number of policies could help stimulate the market, but state cash incentives currently have the most significant impact, and will be a critical element of continued growth in this market.

Edwards, Jennifer L.; Wiser, Ryan; Bolinger, Mark; Forsyth, Trudy

2004-03-01T23:59:59.000Z

376

Waste Management Facilities Cost Information Report  

Science Conference Proceedings (OSTI)

The Waste Management Facility Cost Information (WMFCI) Report, commissioned by the US Department of Energy (DOE), develops planning life-cycle cost (PLCC) estimates for treatment, storage, and disposal facilities. This report contains PLCC estimates versus capacity for 26 different facility cost modules. A procedure to guide DOE and its contractor personnel in the use of estimating data is also provided. Estimates in the report apply to five distinctive waste streams: low-level waste, low-level mixed waste, alpha contaminated low-level waste, alpha contaminated low-level mixed waste, and transuranic waste. The report addresses five different treatment types: incineration, metal/melting and recovery, shredder/compaction, solidification, and vitrification. Data in this report allows the user to develop PLCC estimates for various waste management options.

Feizollahi, F.; Shropshire, D.

1992-10-01T23:59:59.000Z

377

Figure A1. Natural gas processing plant capacity in the United States, 2013 2012  

U.S. Energy Information Administration (EIA) Indexed Site

5 5 Figure A1. Natural gas processing plant capacity in the United States, 2013 2012 Table A2. Natural gas processing plant capacity, by state, 2013 (million cubic feet per day) Alabama 1,403 Arkansas 24 California 926 Colorado 5,450 Florida 90 Illinois 2,100 Kansas 1,818 Kentucky 240 Louisiana 10,737 Michigan 479 Mississippi 1,123

378

Minimum cost model energy code envelope requirements  

SciTech Connect

This paper describes the analysis underlying development of the U.S. Department of Energy`s proposed revisions of the Council of American Building Officials (CABO) 1993 Model Energy Code (MEC) building thermal envelope requirements for single-family and low-rise multifamily residences. This analysis resulted in revised MEC envelope conservation levels based on an objective methodology that determined the minimum-cost combination of energy efficiency measures (EEMs) for residences in different locations around the United States. The proposed MEC revision resulted from a cost-benefit analysis from the consumer`s perspective. In this analysis, the costs of the EEMs were balanced against the benefit of energy savings. Detailed construction, financial, economic, and fuel cost data were compiled, described in a technical support document, and incorporated in the analysis. A cost minimization analysis was used to compare the present value of the total long-nm costs for several alternative EEMs and to select the EEMs that achieved the lowest cost for each location studied. This cost minimization was performed for 881 cities in the United States, and the results were put into the format used by the MEC. This paper describes the methodology for determining minimum-cost energy efficiency measures for ceilings, walls, windows, and floors and presents the results in the form of proposed revisions to the MEC. The proposed MEC revisions would, on average, increase the stringency of the MEC by about 10%.

Connor, C.C.; Lucas, R.G.; Turchen, S.J.

1994-08-01T23:59:59.000Z

379

Software Cost Estimation  

E-Print Network (OSTI)

Software cost estimation is the process of predicting the effort required to develop a software system. Many estimation models have been proposed over the last 30 years. This paper provides a general overview of software cost estimation methods including the recent advances in the field. As a number of these models rely on a software size estimate as input, we first provide an overview of common size metrics. We then highlight the cost estimation models that have been proposed and used successfully. Models may be classified into 2 major categories: algorithmic and non-algorithmic. Each has its own strengths and weaknesses. A key factor in selecting a cost estimation model is the accuracy of its estimates. Unfortunately, despite the large body of experience with estimation models, the accuracy of these models is not satisfactory. The paper includes comment on the performance of the estimation models and description of several newer approaches to cost estimation.

Hareton Leung Zhang; Zhang Fan

2002-01-01T23:59:59.000Z

380

Cost-Affordable Titanium III  

Science Conference Proceedings (OSTI)

Cost-Effective Production and Thermomechanical Consolidation of Titanium Alloy Powders · Cost Affordable Developments in Titanium Technology and ...

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies  

Science Conference Proceedings (OSTI)

The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and WinDS). The authors and general location of the 40 detailed transmission studies included in our review are illustrated in Figure ES-1. As discussed in the body of the report, these studies vary considerably in scope, authorship, objectives, methodology, and tools. Though we recognize this diversity and are cognizant that comparisons among these studies are therefore somewhat inappropriate, we nonetheless emphasize such simple comparisons in this report. We do so in order to improve our understanding of the range of transmission costs needed to access greater quantities of wind, and to highlight some of the drivers of those costs. In so doing, we gloss over many important details and differences among the studies in our sample. In emphasizing simple comparisons, our analysis focuses primarily on the unit cost of transmission implied by each of the studies. The unit cost of transmission for wind in $/kW terms on a capacity-weighted basis is estimated by simply dividing the total transmission cost in a study by the total amount of incremental generation capacity (wind and non-wind) modeled in that study. In so doing, this metric assumes that within any individual study all incremental generation capacity imposes transmission costs in proportion to its nameplate capacity rating. The limitations to this approach are described in some detail in the body of the report.

Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

2009-02-02T23:59:59.000Z

382

Lookin g for data personnel costs, indirect costs, equipment costs  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Negotiating Group Question/Answer Sessions November 19, 2009 Q: What happens now? A: The negotiation process starts tomorrow [November 20, 2009], when DOE will be sending the Awardees an e-mail with information about which website to go to for clarification and direction, information from the Office of Civil Rights, and answers to some of the questions that came up in the meeting. DOE will be gathering information about the questions concerning cyber requirements, metrics, and reporting requirements and will be getting back to the awardees about those issues the week after Thanksgiving. We have done a review of the budgets, and emails will be sent giving opportunities to address any issues. We will also re-review technical and cost proposals.

383

Reduce generating costs and eliminate brownouts  

Science Conference Proceedings (OSTI)

Improving the manoeuverability of a coal-fired plant to allow it to participate in primary frequency support will reduce generation cost and minimize brownouts. The challenge is to do so without compromising efficiency or emissions. This article describes an approach - activation of stored energy - that is cost-effective and applicable to both greenfield and brownfield installations. It requires a new control philosophy, plus the correct application of new level and flow measurement 'best practices'. 4 refs., 1 tab.

Nogaja, R.; Menezes, M. [Emerson Process Management (United States)

2007-06-15T23:59:59.000Z

384

DUF6 Management Cost Analysis Report (CAR): Part 2  

NLE Websites -- All DOE Office Websites (Extended Search)

. . . Cost Analysis Report for the Long-Term Management of May 1997 Figure 4.5 Total Costs of Manufacture of Metal Options 900 800 700 Ctj 300 3 200 100 0 Metal Shielding Oxide Shielding Depleted Uranium Hexafluoride and Oxide Shielding s Decontamination & Decommissioning QI Operations & Maintenance s Regulatory Compliance u Balance of Plant u Manufacturing Facilities s Manufacturing Equipment u Engineering Development 57 ..- . Cost Analysis Report for the Long-Term Management of Depleted Uranium Hexafluoride May 1997 4.4 Long-term Storage Storage of depleted uranium is predicated on its use at some later date. In the engineering analysis, storage options are defined by the type of storage facility, and suboptions are defined by the chemical form in which the depleted uranium is stored. The types of storage facilities analyzed are (1) buildings, (2) below ground vaults,

385

CAPITAL AND OPERATING COST OF HYDROGEN PRODUCTION FROM COAL GASIFICATION  

NLE Websites -- All DOE Office Websites (Extended Search)

CAPITAL AND OPERATING COST OF HYDROGEN CAPITAL AND OPERATING COST OF HYDROGEN PRODUCTION FROM COAL GASIFICATION Final Report April 2003 Prepared for: The United States Department of Energy National Energy Technology Laboratory (NETL) under: Contract No. DE-AM26-99FT40465 between the NETL and Concurrent Technologies Corporation (CTC) Subcontract No. 990700362 between CTC and Parsons Infrastructure & Technology Group Inc. Task 50611 DOE Task Managers: James R. Longanbach Gary J. Stiegel Parsons Project Manager: Michael D. Rutkowski Principal Investigators: Thomas L. Buchanan Michael G. Klett Ronald L. Schoff PARSONS Capital and Operating Cost of Hydrogen Production from Coal Gasification Page i April 2003 TABLE OF CONTENTS Section Title Page List of Tables iii List of Figures iii

386

THE NUCLEAR FUEL CYCLE: PROSPECTS FOR REDUCING ITS COST  

SciTech Connect

Nuclear fuel cost of 1.25 mills/kwh would make nuclear power competitive with conventional power in lowcost coal areas if capital and operating costs can be brought to within about 10 percent of those of coal-fired plants. Substantial decreases in fuel fabrication cost are anticipated by 1970: other costs in the fuel cycle are expccted to remain about the same as at present. Unit costs and irradiation levels that would be needed to give a fuel cost of 1.25 mills/kwh are believed to be attainable by 1970. (auth)

Albrecht, W.L.

1959-02-20T23:59:59.000Z

387

Waste management facilities cost information: System cost model product description. Revision 2  

SciTech Connect

In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for DOE wastes. Transportation costs are provided for truck and rail and include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation`s generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities.

Lundeen, A.S.; Hsu, K.M.; Shropshire, D.E.

1996-02-01T23:59:59.000Z

388

Vehicle Cost Calculator  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Next Vehicle Cost Calculator U.S. Department of Energy Energy Efficiency and Renewable Energy...

389

COSTS OF NUCLEAR POWER  

SciTech Connect

The discussion on the costs of nuclear power from stationary plants, designed primarily for the generation of electricity. deals with those plants in operation, being built, or being designed for construction at an early date. An attempt is made to consider the power costs on the basis of consistent definitions and assumptions for the various nuclear plants and for comparable fossil-fuel plants. Information on several new power reactor projects is included. (auth)

1961-01-01T23:59:59.000Z

390

MHK Cost Breakdown Structure Draft | OpenEI Community  

Open Energy Info (EERE)

MHK Cost Breakdown Structure Draft MHK Cost Breakdown Structure Draft Home > Groups > Water Power Forum Kch's picture Submitted by Kch(24) Member 9 April, 2013 - 13:30 CBS current energy GMREC LCOE levelized cost of energy marine energy MHK ocean energy The generalized Cost Breakdown Structure (CBS) for marine and hydrokinetic (MHK) projects is a hierarchical structure designed to facilitate the collection and organization of lifecycle costs of any type of MHK project, including wave energy converters and current energy convertners. At a high level, the categories in the CBS will be applicable to all projects; at a detailed level, however, the CBS includes many cost categories that will pertain to one project but not others. It is expected that many of the detailed levels of the CBS will be populated with "NA" or left blank.

391

Nuclear Detection Figure Of Merit (NDFOM) Version 1.2 User's Guide  

SciTech Connect

NDFOM is a detector database and detector evaluation system, accessible as a web service. It runs on the same server as the Patriot service, but uses port 8081. In this user's guide, we will use the example case that the patriot service is running on http://patriot.lanl.gov. Then the NDFOM service would be accessible at the URL http://patriot.lanl.gov:8081/ndfom. In addition to local server installations, common server locations are 1) a patriot server running on a virtual machine (use the virtual machine URL with :8081/ndfom), and 2) a patriot server running on a local machine (use http://localhost:8081/ndfom or http://127.0.0.1:8081/ndfom). The home screen provides panels to select detectors, a scenario, and a figure-of-merit. It also has an 'analyze' button, which will evaluate the selected figure-of-merit for the selected detectors, for the scenario selected by the user. The detector effectiveness evaluations are presented through the browser in a ranked list of detectors. The user does not need to log in to perform analysis with pre-supplied detectors, scenarios, and FOMs. The homepage view is shown in Figure 1. The first panel displays a list of the detectors in the current detector database. The user can select one, some, or all detectors to evaluate. On the right of each listed detector, there is a star icon. Clicking that icon will open a panel that displays the details about that detector, such as detector material, dimensions, thresholds, etc. The center panel displays the pre-supplied scenarios that are in the database. A scenario specifies the source of interest, the spectrum of the radiation, the background radiation spectrum, the distance or distance of closest approach, the allowable false positive rate, and the dwell time or speed. Scenario details can be obtained by clicking the star to the right of a scenario. A scenario can be selected by clicking it.

Stroud, Phillip D [Los Alamos National Laboratory; Dufresne, Thomas A. [Los Alamos National Laboratory

2012-08-27T23:59:59.000Z

392

Incremental cost analysis of advanced concept CAES systems  

SciTech Connect

The costs of compressed air energy storage (CAES) systems using thermal energy storage (TES) are compared to the costs of CAES systems without TES and simple cycle gas turbine systems. Comparisons are made in terms of the system energy costs levelized over the operating life of the systems. These are in 1985 price levels which is the assumed first year of operation for the systems.

Knutsen, C.A.

1979-09-01T23:59:59.000Z

393

Survey of nuclear power plant construction costs, 1983  

SciTech Connect

This report presents cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in the construction pipeline, collected on Form EIA-254. The information on US nuclear power plants in the construction pipeline is reported voluntarily each quarter by the electric utilities. This report presents the data collected in the first quarter of 1983 on the 71 nuclear units in the construction pipeline. Historical data on 73 units, totalling 57,287 net megawatts (MWe) of design capacity, in commercial operation as of March 31, 1983, are also given. Three types of information are included: plant characteristics and ownership, construction costs, and construction schedule or chronology. Summary statistics are presented on direct component costs and construction leadtimes for a sample of operating units and units in the construction pipeline. The reactor-specific cost data included in Chapter 4 are the estimated final nuclear production plant costs and, for units in the construction pipeline, the disbursed and sunk costs as of March 31, 1983. 7 figures, 5 tables.

1983-12-01T23:59:59.000Z

394

Rocky Flats Closure Unit Cost Data  

SciTech Connect

The Rocky Flats Closure Project has completed the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, remediating environmental media and closing the Rocky Flats Site (Site). The project cost approximately $4.1 B and included the decommissioning of over 700 structures including 5 major plutonium facilities and 5 major uranium facilities, shipping over 14,600 cubic meters of transuranic and 565,000 cubic meters of low level radioactive waste, and remediating a 385-acre industrial area and the surrounding land. Actual costs were collected for a large variety of closure activities. These costs can be correlated with metrics associated with the facilities and environmental media to capture cost factors from the project that could be applicable to a variety of other closure projects both within and outside of the Department of Energy's weapons complex. The paper covers four general topics: the process to correlate the actual costs and metrics, an example of the correlated data for one large sub-project, a discussion of the results, and the additional activities that are planned to correlate and make this data available to the public. The process to collect and arrange the project control data of the Closure Project relied on the actual Closure Project cost information. It was used to correlate these actual costs with the metrics for the physical work, such as building area or waste generated, to support the development of parametric cost factors. The example provides cost factors for the Industrial Sites Project. The discussion addresses the strengths and weaknesses of the data, followed by a section identifying future activities to improve and extend the analyses and integrate it within the Department's Environmental Cost Analysis System. (authors)

Sanford, P.C. [1129 Business Parkway South, Westminister, MD (United States); Skokan, B. [United States Department of Energy, Washington, DC (United States)

2007-07-01T23:59:59.000Z

395

Low-cost method for producing extreme ultraviolet lithography optics  

DOE Patents (OSTI)

Spherical and non-spherical optical elements produced by standard optical figuring and polishing techniques are extremely expensive. Such surfaces can be cheaply produced by diamond turning; however, the roughness in the diamond turned surface prevent their use for EUV lithography. These ripples are smoothed with a coating of polyimide before applying a 60 period Mo/Si multilayer to reflect a wavelength of 134 .ANG. and have obtained peak reflectivities close to 63%. The savings in cost are about a factor of 100.

Folta, James A. (Livermore, CA); Montcalm, Claude (Fort Collins, CO); Taylor, John S. (Livermore, CA); Spiller, Eberhard A. (Mt. Kisco, NY)

2003-11-21T23:59:59.000Z

396

Wind Electrolysis: Hydrogen Cost Optimization  

NLE Websites -- All DOE Office Websites (Extended Search)

which needs to be 44% or better along with relatively high wind speeds. Along with low production costs, however, delivery and storage costs will also factor into the final cost...

397

Roadway Improvement Project Cost Allocation  

E-Print Network (OSTI)

Roadway Improvement Project Cost Allocation CTS 21st Annual Transportation Research Conference costs #12;Potential Applications · Roadway Project Feasibility Studies ­ Identified potential roadway infrastructure improvement ­ Documentation of estimated project costs ­ Determine property assessments

Minnesota, University of

398

INDEPENDENT COST REVIEW (ICR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

399

INDEPENDENT COST REVIEW (ICR)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

COST REVIEW (ICR) COST REVIEW (ICR) and INDEPENDENT COST ESTIMATE (ICE) STANDARD OPERATING PROCEDURES (SOP) Revision 1 DEPARTMENT OF ENERGY (DOE) OFFICE OF ACQUISITION AND PROJECT MANAGEMENT (OAPM) September 2013 SUMMARY OF UPDATES: This revision includes the following significant changes since the December 2011 SOP release: 1. The original SOP discussed how an EIR and an ICE could be executed in tandem, but since we are no longer advocating this approach the ICE process has been completely separated from the EIR process and references to EIRs have been removed. 2. Section 1 adds a reference to Public Law 2055 reflecting that we must now, as a matter of law, perform an ICE at CD-3 for projects with a TPC over $100 million. 3. Section 2 notes that DOE Programs must now pay for ICRs and ICEs and reflects that PARS II must be

400

Power Plant Cycling Costs  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Plant Cycling Costs Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Subcontract Report NREL/SR-5500-55433 July 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Prepared under Subcontract No. NFT-1-11325-01

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

SOLID OXIDE FUEL CELL MANUFACTURING COST MODEL: SIMULATING RELATIONSHIPS BETWEEN PERFORMANCE, MANUFACTURING, AND COST OF PRODUCTION  

DOE Green Energy (OSTI)

The successful commercialization of fuel cells will depend on the achievement of competitive system costs and efficiencies. System cost directly impacts the capital equipment component of cost of electricity (COE) and is a major contributor to the O and M component. The replacement costs for equipment (also heavily influenced by stack life) is generally a major contributor to O and M costs. In this project, they worked with the SECA industrial teams to estimate the impact of general manufacturing issues of interest on stack cost using an activities-based cost model for anode-supported planar SOFC stacks with metallic interconnects. An earlier model developed for NETL for anode supported planar SOFCs was enhanced by a linkage to a performance/thermal/mechanical model, by addition of Quality Control steps to the process flow with specific characterization methods, and by assessment of economies of scale. The 3-dimensional adiabatic performance model was used to calculate the average power density for the assumed geometry and operating conditions (i.e., inlet and exhaust temperatures, utilization, and fuel composition) based on publicly available polarizations curves. The SECA team provided guidance on what manufacturing and design issues should be assessed in this Phase I demonstration of cost modeling capabilities. They considered the impact of the following parameters on yield and cost: layer thickness (i.e., anode, electrolyte, and cathode) on cost and stress levels, statistical nature of ceramic material failure on yield, and Quality Control steps and strategies. In this demonstration of the capabilities of the linked model, only the active stack (i.e., anode, electrolyte, and cathode) and interconnect materials were included in the analysis. Factory costs are presented on an area and kilowatt basis to allow developers to extrapolate to their level of performance, stack design, materials, seal and system configurations, and internal corporate overheads and margin goals.

Eric J. Carlson; Yong Yang; Chandler Fulton

2004-04-20T23:59:59.000Z

402

Production Cost Optimization Assessments  

Science Conference Proceedings (OSTI)

The benefits of improved thermal performance of coal-fired power plants continue to grow, as the costs of fuel rise and the prospect of a carbon dioxide cap and trade program looms on the horizon. This report summarizes the efforts to date of utilities committed to reducing their heat rate by 1.0% in the Production Cost Optimization (PCO) Project. The process includes benchmarking of plant thermal performance using existing plant data and a site-specific performance appraisal. The appraisal determines po...

2008-12-11T23:59:59.000Z

403

Low Cost, Durable Seal  

SciTech Connect

Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

Roberts, George; Parsons, Jason; Friedman, Jake

2010-12-17T23:59:59.000Z

404

Evidence of cost growth under cost-plus and fixed-price contracting  

SciTech Connect

As defined by the US Department of Energy (DOE), privatization refers to a shifting of responsibilities for the completion of projects from a cost-plus Management and Operations (M and O) contract, to incentive-based contracts with the private sector. DOE`s new vision is to arrange cleanup work around incentives-based contracts, which are won via competitive bidding. Competition in awarding cleanup contracts can make use of market incentives to lower project costs and reduce slippage time. Fixed-price contracts encourage contractors to minimize schedule delays and cost overruns once the scope of a project has been negotiated. Conversely, cost-plus contracting offers weak incentives for contractors to select cost-minimizing production and management approaches. Because privatization explicitly allocates more risk to the contractor, it forces the government to better define its goals and methods. This study summarizes actual cost experiences with government contracts performed under cost-plus and fixed-price incentive structures at all levels of government. The first section provides some background on the problem of making contractor activity more cost-efficient. Following this are sections on the measurement of performance and the costs of projects, limitations on measurement, and findings of similar studies. The study concludes with appendices discussing the details of the performance measurement methodology and the project data sets used in the study.

Scott, M.J.; Paananaen, O.H.; Redgate, T.E.; Ulibarri, C.A.; Jaksch, J.A.

1998-09-01T23:59:59.000Z

405

Cost and Performance Tradeoff Analysis of Cell Planning Levels.  

E-Print Network (OSTI)

?? In wireless communication systems, optimal placement of base station locations, i.e.,cell planning, has been considered one of major tools for performance improvement.However, the cell… (more)

Gao, Jun

2013-01-01T23:59:59.000Z

406

Agricultural greenhouse gas emissions : costs associated with farm level mitigation.  

E-Print Network (OSTI)

??Agricultural greenhouse gas emissions within New Zealand account for 48 percent of all national greenhouse gas emissions. With the introduction of the emissions trading scheme… (more)

Wolken, Antony Raymond

2009-01-01T23:59:59.000Z

407

DOE Hydrogen and Fuel Cells Program Record 12024: Hydrogen Production Cost Using Low-Cost Natural Gas  

NLE Websites -- All DOE Office Websites (Extended Search)

2024 Date: September 19, 2012 2024 Date: September 19, 2012 Title: Hydrogen Production Cost Using Low-Cost Natural Gas Originator: Sara Dillich, Todd Ramsden & Marc Melaina Approved by: Sunita Satyapal Date: September 24, 2012 Item: Hydrogen produced and dispensed in distributed facilities at high-volume refueling stations using current technology and DOE's Annual Energy Outlook (AEO) 2009 projected prices for industrial natural gas result in a hydrogen levelized cost of $4.49 per gallon-gasoline-equivalent (gge) (untaxed) including compression, storage and dispensing costs. The hydrogen production portion of this cost is $2.03/gge. In comparison, current analyses using low-cost natural gas with a price of $2.00 per MMBtu can decrease the hydrogen levelized cost to $3.68 per gge (untaxed) including

408

Issue 5: Optimizing High Levels of Insulation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issue 5: Optimizing High Levels of Insulation NREL, Ren Anderson Building America Technical Update Meeting July 25 th , 2012 Issue 5 - How Much Insulation is Too Much? How do we define the cost-effective limit for improvements in enclosure efficiency? Key Factors to Consider: -Cost of savings vs. cost of grid-supplied energy -Cost of efficiency savings vs. cost of savings from renewable generation. -Savings from envelope improvements vs. other efficiency options Context * It is widely believed that code-specified insulation levels also represent cost-effective limits. * However, the cost-effective insulation levels exceed IECC values in many climates. * The homeowner-driven value of modest increases in enclosure performance can create economies of scale that will reduce

409

New England Wind Forum: Wind Compared to the Cost of Other Electricity  

Wind Powering America (EERE)

Wind Compared to the Cost of Other Electricity Generation Options Wind Compared to the Cost of Other Electricity Generation Options Figure 1: Average Cumulative Wind and Wholesale Power Prices by Region The chart shows average cumulative wind and wholesale power prices by region. Click on the graph to view a larger version. View a larger version of the graph. In terms of direct costs, larger wind farms in windier areas are now considered economically competitive with "conventional" fossil fuel power plants in many locations. In New England, direct costs for wind power at larger sites with strong winds are approaching the cost of alternatives, particularly given the recent high natural gas and oil prices. Figure 1 compares wind contract prices1 with wholesale electricity market prices in different U.S. regions for 2006. Although not directly comparable to wind prices due to wind's production timing and intermittence, the value of wind Renewable Energy Credits and carbon offsets, and the cost of wind integration and transmission, the average wholesale market energy price is a good indicator of the cost of alternative generation options. This graph demonstrates several points:

410

Heliostat cost reduction study.  

DOE Green Energy (OSTI)

Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

2007-06-01T23:59:59.000Z

411

Service Provider Competition: Delay Cost Structure, Segmentation, and Cost Advantage  

Science Conference Proceedings (OSTI)

We model competition between two providers who serve delay-sensitive customers. We compare a generalized delay cost structure, where a customer's delay cost depends on her service valuation, with the traditional additive delay cost structure, where the ... Keywords: delay cost structure, service competition, value-based market segmentation

Maxim Afanasyev; Haim Mendelson

2010-04-01T23:59:59.000Z

412

Long-run marginal costs lower than average costs  

SciTech Connect

The thesis of this article is that the long-run marginal costs of electricity are not always greater than the present average costs, as is often assumed. As long as short-run costs decrease with new plant additions, the long-run marginal cost is less than long-run average cost. When average costs increase with new additions, long-run marginal costs are greater than long-run average costs. The long-run marginal costs of a particular utility may be less than, equal to, or greater than its long-run average costs - even with inflation present. The way to determine which condition holds for a given utility is to estimate costs under various combinations of assumptions: probable load growth, zero load growth, and load growth greater than expected; and changes in load factor with attendant costs. Utilities that can demonstrate long-run marginal costs lower than long-run average costs should be encouraged to build plant and increase load, for the resulting productivity gains and slowing of inflation. Utilities that face long-run marginal costs greater than long-run average costs should discourage growth in sales through any available means.

Hunter, S.R.

1980-01-03T23:59:59.000Z

413

Long-run incremental costs and the pricing of electricity. Part II. [Comparative evaluation of marginal cost pricing and average cost pricing  

SciTech Connect

Total costs have essentially the same cost components whether long-run average costs or long-run incremental costs are used. The variable components, chiefly fuel, may be somewhat different in the new incremental plant compared to the old average plant; where the difference is between nuclear fuel and fossil fuel, its size is substantial. However, given the same kind of plant, the current prices of materials and labor will be essentially the same whether used in the new or the old plant with long-run incremental costs (LRIC) or long-run average costs (LRAC). The lower cost of electricity produced in nuclear plants constructed today, as compared to fossil fuel plants constructed at the same time, is not to be confused with the relation between LRIC and LRAC. LRAC is the average cost of electricity from all existing plants priced at their historical costs, which were generally lower than current costs. These average historical costs per kilowatt are still likely to be lower than the current incremental cost per kilowatt of the newest nuclear plant built at present price levels. LRAC is, therefore, still likely to be lower than LRIC for either fossil or nuclear. Data from the Wisconsin Power and Light Company, the Madison Gas and Electric Company, and Tuscon Gas and Electric Company are examined to study some comparisons. Some pricing principles that vary seasonally for resort hotels are reviewed. (MCW)

Morton, W.A.

1976-03-25T23:59:59.000Z

414

Building Energy Software Tools Directory: Room Air Conditioner Cost  

NLE Websites -- All DOE Office Websites (Extended Search)

Room Air Conditioner Cost Estimator Room Air Conditioner Cost Estimator Screen capture of Room Air Conditioner Cost Estimator The cost estimator compares high-efficiency room air conditioners to standard equipment in terms of life cycle cost. It provides an alternative to complicated building simulation models, while offering more precision than simplified estimating tools that are commonly available. The cost estimator assists decision-making regarding the purchase or replacement of room air conditioning equipment, by estimating a product�s lifetime energy cost savings at various efficiency levels. Screen Shots Keywords air conditioner, life-cycle cost, energy performance, residential buildings, energy savings Validation/Testing Internal reviews at Pacific Northwest National Laboratory.

415

Question: What is the cost threshold for providing cost detail for subrecipient  

NLE Websites -- All DOE Office Websites (Extended Search)

Question: What is the cost threshold for providing cost detail for subrecipients or consultant Question: What is the cost threshold for providing cost detail for subrecipients or consultant information? Is there a cost threshold set for third parties? Answer: Each subawardee/subrecipient/subcontractor whose work is expected to exceed $650,000 or 50% of the total work effort (whichever is less) should complete a Budget Justification package to include the SF 424A budget form, Budget Justification Guideline Excel document, and a narrative supporting the Budget Justification Guidelines. This information may be saved as a separate file or included with the Prime Applicant's Budget.pdf file. Summary level information for subawardees is not sufficient. Detailed explanations and supporting

416

Review of storage battery system cost estimates  

DOE Green Energy (OSTI)

Cost analyses for zinc bromine, sodium sulfur, and lead acid batteries were reviewed. Zinc bromine and sodium sulfur batteries were selected because of their advanced design nature and the high level of interest in these two technologies. Lead acid batteries were included to establish a baseline representative of a more mature technology.

Brown, D.R.; Russell, J.A.

1986-04-01T23:59:59.000Z

417

Percent of 2010 Luminaire Cost LED Luminaire Cost  

E-Print Network (OSTI)

LEDs promise to change the world, and few doubt that they will, but a key limiter to more rapid adoption is the cost of the LED themselves. The cost breakdown of LED luminaires vary, but it is safe to put the cost of the LED at around 25% to 40 % of the total luminaire cost. It is projected to remain a significant cost of the total luminaire for many years.

unknown authors

2012-01-01T23:59:59.000Z

418

Low Cost Hydrogen Production Platform  

DOE Green Energy (OSTI)

A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was conducted to identify any potential design deficiency related to the concept. The analysis showed that no fundamental design flaw existed with the concept, but additional simulations and prototypes would be required to verify the design prior to fabricating a production unit. These identified risks were addressed in detail during Phase II of the development program. Along with the models of the high temperature components, a detailed process and 3D design model of the remainder of system, including PSA, compression, controls, water treatment and instrumentation was developed and evaluated. Also, in Phase II of the program, laboratory/fullscale testing of the high temperature components was completed and stable operation/control of the system was verified. The overall design specifications and test results were then used to develop accurate hydrogen costs for the optimized system. Praxair continued development and testing of the system beyond the Phase II funding provided by the DOE through the end of 2008. This additional testing is not documented in this report, but did provide significant additional data for development of a prototype system as detailed in the Phase III proposal. The estimated hydrogen product costs were developed (2007 basis) for the 4.8 kg/h system at production rates of 1, 5, 10, 100 and 1,000 units built per year. With the low cost SMR approach, the product hydrogen costs for the 4.8 kg/h units at 50 units produced per year were approximately $3.02 per kg. With increasing the volume production to 1,000 units per year, the hydrogen costs are reduced by about 12% to $2.67 per kg. The cost reduction of only 12% is a result of significant design and fabrication efficiencies being realized in all levels of production runs through utilizing the DFMA principles. A simplified and easily manufactured design does not require large production volumes to show significant cost benefits. These costs represent a significant improvement and a new benchmark in the cost to produce small volume on-site hydrogen using existing process technologies. The cost mo

Timothy M. Aaron, Jerome T. Jankowiak

2009-10-16T23:59:59.000Z

419

Portugal Egypt Figure 2. Natural gas supply and disposition in the United States, 2012  

U.S. Energy Information Administration (EIA) Indexed Site

Portugal Egypt Figure 2. Natural gas supply and disposition in the United States, 2012 (trillion cubic feet) Natural Gas Plant Liquids Production Gross Withdrawals From Gas and Oil Wells Nonhydrocarbon Gases Removed Vented/Flared Reservoir Repressuring Production Dry Gas Imports Canada Trinidad/Tobago Natural Gas Storage Facilities Exports Japan Canada Mexico Additions Withdrawals Gas Industry Use Residential Commercial Industrial Vehicle Fuel Electric Power 29.5 0.8 0.2 3.3 2.963 0.112 0.620 0.971 0.014 24.1 1.3 2.9 2.8 2.5 2.9 7.2 0.03 9.1 0.003 Sources: Energy Information Administration (EIA), Form EIA-176, "Annual Report of Natural and Supplemental Gas Supply and Disposition"; Form EIA-895, "Annual Quantity and

420

Thermoelectric figure of merit of Ag{sub 2}Se with Ag and Se excess  

Science Conference Proceedings (OSTI)

In the temperature range of 100-300 K, the electric ({sigma}) and thermoelectric ({alpha}{sub 0}) properties of Ag{sub 2}Se with an excess of Ag as high as {approx}0.1 at. % and Se as high as {approx}1.0 at. %, respectively, are investigated. From the data on {sigma}, {alpha}{sub 0}, and {chi}{sub tot} (thermal conductivities), the thermoelectric power {alpha}{sub 0}{sup 2}{sigma} and the figure of merit Z are calculated. It is found that {alpha}{sub 0}{sup 2}{sigma} and Z attain the peak values at room temperature and the electron concentration n {approx} 6.5 x 10{sup 18} cm{sup -3}.

Aliev, F. F., E-mail: farzali@physics.ab.az; Jafarov, M. B.; Eminova, V. I. [Azerbaijan National Academy of Sciences, Institute of Physics (Azerbaijan)

2009-08-15T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

PHENIX (Pioneering High Energy Nuclear Interaction eXperiment): Data Tables and Figures from Published Papers  

DOE Data Explorer (OSTI)

The PHENIX Experiment is the largest of the four experiments currently taking data at the Relativistic Heavy Ion Collider. PHENIX, the Pioneering High Energy Nuclear Interaction eXperiment, is an exploratory experiment for the investigation of high energy collisions of heavy ions and protons. PHENIX is designed specifically to measure direct probes of the collisions such as electrons, muons, and photons. The primary goal of PHENIX is to discover and study a new state of matter called the Quark-Gluon Plasma. More than 60 published papers and preprints are listed here with links to the full text and separate links to the supporting PHENIX data in plain text tables and to EPS and GIF figures from the papers.

422

Uncertainty Quantification and Calibration in Well Construction Cost Estimates  

E-Print Network (OSTI)

The feasibility and success of petroleum development projects depend to a large degree on well construction costs. Well construction cost estimates often contain high levels of uncertainty. In many cases, these costs have been estimated using deterministic methods that do not reliably account for uncertainty, leading to biased estimates. The primary objective of this work was to improve the reliability of deterministic well construction cost estimates by incorporating probabilistic methods into the estimation process. The method uses historical well cost estimates and actual well costs to develop probabilistic correction factors that can be applied to future well cost estimates. These factors can be applied to the entire well cost or to individual cost components. Application of the methodology to estimation of well construction costs for horizontal wells in a shale gas play resulted in well cost estimates that were well calibrated probabilistically. Overall, average estimated well cost using this methodology was significantly more accurate than average estimated well cost using deterministic methods. Systematic use of this methodology can provide for more accurate and efficient allocation of capital for drilling campaigns, which should have significant impacts on reservoir development and profitability.

Valdes Machado, Alejandro

2013-08-01T23:59:59.000Z

423

Mid-Level Vision and Recognition of Non-Rigid Objects  

E-Print Network (OSTI)

We address mid-level vision for the recognition of non-rigid objects. We align model and image using frame curves - which are object or "figure/ground" skeletons. Frame curves are computed, without discontinuities, ...

Subirana-Vilanova, J. Brian

1995-04-01T23:59:59.000Z

424

Russian gas resource base large, overstated, costly to maintain  

SciTech Connect

The natural gas resources of the Former Soviet Union are immense, with an officially estimated initial recoverable endowment of 250.7 trillion cu m (8,852 trillion cu ft). Of this volume, 85% is located in the Russian Federation, which will be the dominant world supplier of gas through 2015. Although Russia possesses an amazing gas resource base, official figures overstate both the recovery factor for gas in place and appear to systematically overestimate volumes of recoverable gas in undiscovered fields. Production and transportation of gas from the Yamal peninsula and the new discoveries in the Kara and Barents seas will cost many times the current average cost of gas production in Russian. The paper discusses resources and reserves and examines the reliability of Soviet-vintage data.

Grace, J.D. (Troika Energy Services, Dallas, TX (United States))

1995-02-06T23:59:59.000Z

425

costs | OpenEI  

Open Energy Info (EERE)

7 7 Varnish cache server costs Dataset Summary Description This dataset represents a historical repository of all the numerical data from the smartgrid.gov website condensed into spreadsheets to enable analysis of the data. Below are a couple of things worth noting: Source Smartgrid.gov Date Released March 04th, 2013 (11 months ago) Date Updated March 04th, 2013 (11 months ago) Keywords AMI costs distribution smart grid transmission Data application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 4Q12 (xlsx, 112.1 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 3Q12 (xlsx, 107.9 KiB) application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon SmartGrid.gov Quarterly Data Summary 2Q12 (xlsx, 111.9 KiB)

426

Geothermal probabilistic cost study  

DOE Green Energy (OSTI)

A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

1981-08-01T23:59:59.000Z

427

Alaskan N. Slope focus shifts from wildcats to cutting production costs  

SciTech Connect

North Slope operators are trying to hold the line against declining production with programs hit by lingering uncertainty over crude prices and taxes. The emphasis has shifted from last year's strong exploratory drilling campaign and high hopes fueled by the Kuvlum discovery to focus on more cost-efficient recovery of oil from producing fields. On the exploratory scene, the level of activity was low this past winter on the North Slope. Although Prudhoe Bay remains far out in front as the top producing field in the US, a field decline that began in 1989 continues. Overall, North Slope output declined in the first quarter but at a lower rate than Prudhoe Bay's. During the period, Prudhoe Bay, Kuparuk River, Endicott, Point McIntyre, and Milne Point together produced an average 1.64 million b/d, down 2.4% from last year. Horizontal wells and coiled tubing are an important part of the productivity of the Prudhoe Bay field. The paper discusses this technology, as well as the Gas Handling Expansion No.2 facility. The bright spot in the North Slope is the Point McIntyre field discovered in 1988. The paper gives some background and production figures for this field. Niakuk and Milne Point fields are also highlighted.

Not Available

1994-06-06T23:59:59.000Z

428

Hydrogen Refueling Station Costs in Shanghai  

E-Print Network (OSTI)

E. Hydrogen Supply: Cost Estimate for Hydrogen Pathways -costs are compared with cost estimates of similar stationsHydrogen Supply: Cost Estimate for Hydrogen Pathways-Scoping

Weinert, Jonathan X.; Shaojun, Liu; Ogden, J; Jianxin, Ma

2006-01-01T23:59:59.000Z

429

Cost Study Manual | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cost Study Manual Cost Study Manual Update 62912. Memo regarding Cost Study Manual Cost Study Manual More Documents & Publications Technical Standards, Newsletter-June 1999 Build...

430

FY 1995 cost savings report  

SciTech Connect

Fiscal Year (FY) 1995 challenged us to dramatically reduce costs at Hanford. We began the year with an 8 percent reduction in our Environmental Management budget but at the same time were tasked with accomplishing additional workscope. This resulted in a Productivity Challenge whereby we took on more work at the beginning of the year than we had funding to complete. During the year, the Productivity Challenge actually grew to 23 percent because of recissions, Congressional budget reductions, and DOE Headquarters actions. We successfully met our FY 1995 Productivity Challenge through an aggressive cost reduction program that identified and eliminated unnecessary workscope and found ways to be more efficient. We reduced the size of the workforce, cut overhead expenses, eliminated paperwork, cancelled construction of new facilities, and reengineered our processes. We are proving we can get the job done better and for less money at Hanford. DOE`s drive to do it ``better, faster, cheaper`` has led us to look for more and larger partnerships with the private sector. The biggest will be privatization of Hanford`s Tank Waste Remediation System, which will turn liquid tank waste into glass logs for eventual disposal. We will also save millions of dollars and avoid the cost of replacing aging steam plants by contracting Hanford`s energy needs to a private company. Other privatization successes include the Hanford Mail Service, a spinoff of advanced technical training, low level mixed waste thermal treatment, and transfer of the Hanford Museums of Science and history to a private non-profit organization. Despite the rough roads and uncertainty we faced in FY 1995, less than 3 percent of our work fell behind schedule, while the work that was performed was completed with an 8.6 percent cost under-run. We not only met the FY 1995 productivity challenge, we also met our FY 1995-1998 savings commitments and accelerated some critical cleanup milestones. The challenges continue. Budgets remain on the decline, even while the expectations increase. Yet we are confident in our ability to keep our commitments and goals by identifying new efficiencies in the Hanford cleanup program. We will also pursue new contracting arrangements that will allow us to foster greater competition and use more commercial practices while maintaining our commitment to the safety and health of the public, our workers, and the environment.

Andrews-Smith, K.L., Westinghouse Hanford

1996-06-21T23:59:59.000Z

431

Comparative analysis of energy costing methodologies  

SciTech Connect

The methodologies used for computing levelized busbar costs of electricity from geothermal (hydrothermal) resources used by 16 organizations active in the geothermal area are discussed. The methodologies are compared by (a) comparing the results obtained by using two standard data sets, (b) a theoretical analysis of the mathematical formulation of the embedded models, and (c) an examination of differences in data and assumptions. The objective is to attempt to resolve differences in estimates of geothermal (and conventional) electric power costs, upon which policies may be formulated and research, development and demonstration activities designed and implemented.

El-Sawy, A.H.; Leigh, J.G.; Trehan, R.K.

1979-02-01T23:59:59.000Z

432

2011 Cost of Wind Energy Review  

SciTech Connect

This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.

Tegen, S.; Lantz, E.; Hand, M.; Maples, B.; Smith, A.; Schwabe, P.

2013-03-01T23:59:59.000Z

433

2011 Cost of Wind Energy Review  

DOE Green Energy (OSTI)

This report describes the levelized cost of energy (LCOE) for a typical land-based wind turbine installed in the United States in 2011, as well as the modeled LCOE for a fixed-bottom offshore wind turbine installed in the United States in 2011. Each of the four major components of the LCOE equation are explained in detail, such as installed capital cost, annual energy production, annual operating expenses, and financing, and including sensitivity ranges that show how each component can affect LCOE. These LCOE calculations are used for planning and other purposes by the U.S. Department of Energy's Wind Program.

Tegen, S.; Lantz, E.; Hand, M.; Maples, B.; Smith, A.; Schwabe, P.

2013-03-01T23:59:59.000Z

434

Pennsylvania life cycle costing manual  

SciTech Connect

Until the 1970s, it was commonplace for institutions and governments to purchase equipment based on lowest initial (first) costs. Recurring costs such as operational, maintenance, and energy costs often were not considered in the purchase decision. If an agency wanted to buy something, it published specifications and requested bids from several manufacturers. Often, the lowest bidder who met the specifications won the job, with no consideration given to the economic life of the equipment or yearly recurring costs such as energy and maintenance costs. The practice of purchasing based on lowest initial costs probably did not make good economic sense prior to 1970, and it certainly does not make good sense now. The wise person will consider all costs and benefits associated with a purchase, both initial and post-purchase, in order to make procurement decisions that are valid for the life of the equipment. This describes a method of financial analysis that considers all pertinent costs: life cycle costing (LCC).

1996-02-01T23:59:59.000Z

435

Waste management facilities cost information for transuranic waste  

SciTech Connect

This report contains preconceptual designs and planning level life-cycle cost estimates for managing transuranic waste. The report`s information on treatment and storage modules can be integrated to develop total life-cycle costs for various waste management options. A procedure to guide the U.S. Department of Energy and its contractor personnel in the use of cost estimation data is also summarized in this report.

Shropshire, D.; Sherick, M.; Biagi, C.

1995-06-01T23:59:59.000Z

436

Utility Scale Solar PV Cost Steven SimmonsSteven Simmons  

E-Print Network (OSTI)

, permitting) Early construction (procurement, site prep) Construction Month % of TTL Cost 12 month ­ 1% 12 month ­ 14 % 12 month ­ 85 % Month % of TTL Cost 12 month ­ 1% 12 month ­ 14 % 12 month ­ 85 % Financing.69 113.43 96.66 TTL 213.94 189.08 156.97 137.12 0 debt term 25 years 200 250 $/MWh 2012$ Levelized Cost

437

Energy Technology Cost and Performance Data | OpenEI  

Open Energy Info (EERE)

Technology Cost and Performance Data Technology Cost and Performance Data Dataset Summary Description This data indicates the range of recent cost estimates for renewable energy and other technologies. The estimates are shown in dollars per installed kilowatts of generating capacity. This data provides a compilation of available national-level cost data from a variety of sources. Costs in your specific location will vary. All costs are in 2006 dollars per installed kilowatts in the United States. Source NREL Date Released August 06th, 2009 (5 years ago) Date Updated August 06th, 2009 (5 years ago) Keywords analysis Department of Energy DOE National Renewable Energy Laboratory Data application/vnd.ms-excel icon Energy Technology Cost and Performance Data (xls, 107.5 KiB) text/csv icon Capacity Factor (csv, 1.8 KiB)

438

Renewable Energy Technology Costs and Drivers | Open Energy Information  

Open Energy Info (EERE)

Renewable Energy Technology Costs and Drivers Renewable Energy Technology Costs and Drivers Jump to: navigation, search Tool Summary Name: Renewable Energy Technology Costs and Drivers Agency/Company /Organization: National Renewable Energy Laboratory Sector: Energy Focus Area: Renewable Energy Topics: Finance, Market analysis, Technology characterizations Resource Type: Publications Website: prod-http-80-800498448.us-east-1.elb.amazonaws.com//w/images/6/63/RE_C Renewable Energy Technology Costs and Drivers Screenshot References: Renewable Energy Technology Costs and Drivers[1] Summary "Provided herein is a preliminary, high-level summary of future and projected cost estimates for 1) Biofuels, 2) Solar (PV & CSP), and 3) Vehicle Batteries. Cost estimates are dependent on various assumptions and

439

Transition-cost issues for a restructuring US electricity industry  

Science Conference Proceedings (OSTI)

Utilities regulators can use a variety of approaches to calculate transition costs. We categorized these approaches along three dimensions. The first dimension is the use of administrative vs. market procedures to value the assets in question. Administrative approaches use analytical techniques to estimate transition costs. Market valuation relies on the purchase price of particular assets to determine their market values. The second dimension concerns when the valuation is done, either before or after the restructuring of the electricity industry. The third dimension concerns the level of detail involved in the valuation, what is often called top-down vs. bottom-up valuation. This paper discusses estimation approaches, criteria to assess estimation methods, specific approaches to estimating transition costs, factors that affect transition-cost estimates, strategies to address transition costs, who should pay transition costs, and the integration of cost recovery with competitive markets.

NONE

1997-03-01T23:59:59.000Z

440

Cost and Performance Assumptions for Modeling Electricity Generation Technologies  

Science Conference Proceedings (OSTI)

The goal of this project was to compare and contrast utility scale power plant characteristics used in data sets that support energy market models. Characteristics include both technology cost and technology performance projections to the year 2050. Cost parameters include installed capital costs and operation and maintenance (O&M) costs. Performance parameters include plant size, heat rate, capacity factor or availability factor, and plant lifetime. Conventional, renewable, and emerging electricity generating technologies were considered. Six data sets, each associated with a different model, were selected. Two of the data sets represent modeled results, not direct model inputs. These two data sets include cost and performance improvements that result from increased deployment as well as resulting capacity factors estimated from particular model runs; other data sets represent model input data. For the technologies contained in each data set, the levelized cost of energy (LCOE) was also evaluated, according to published cost, performance, and fuel assumptions.

Tidball, R.; Bluestein, J.; Rodriguez, N.; Knoke, S.

2010-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Cost-sensitive classifier evaluation using cost curves  

Science Conference Proceedings (OSTI)

The evaluation of classifier performance in a cost-sensitive setting is straightforward if the operating conditions (misclassification costs and class distributions) are fixed and known. When this is not the case, evaluation requires a method of visualizing ...

Robert C. Holte; Chris Drummond

2008-05-01T23:59:59.000Z

442

Cost Sensitive Conditional Planning  

E-Print Network (OSTI)

While POMDPs provide a general platform for conditional planning under a wide range of quality metrics they have limited scalability. On the other hand, uniform probability conditional planners scale very well, but many lack the ability to optimize plan quality metrics. We present an innovation to planning graph based heuristics that helps uniform probability conditional planners both scale and generate high quality plans when using actions with non uniform costs. We make empirical comparisons with two state of the art planners to show the benefit of our techniques.

Daniel Bryce; Subbarao Kambhampati

2005-01-01T23:59:59.000Z

443

Cost benefit of caustic recycle for tank waste remediation at the Hanford and Savannah River Sites  

SciTech Connect

The potential cost savings due to the use of caustic recycle used in conjunction with remediation of radioactive underground storage tank waste, is shown in a figure for the Hanford and Savannah River sites. Two cost savings estimates for each case have been made for Hanford, and one cost savings estimate for each case have been made for Hanford, and one cost savings estimate for each case has been made for the Savannah River site. This is due to the Hanford site remediation effort being less mature than that of Savannah River; and consequently, a range of cost savings being more appropriate for Hanford. This range of cost savings (rather than a ingle value) for each case at Hanford is due to cost uncertainties related to the LAW immobilization operation. Caustic recycle Case-1 has been defined as the sodium required to meet al identified caustic needs for the entire Site. Case-2 has been defined as the maximum sodium which can be separated from the low activity waste without precipitation of Al(OH){sub 3}. It has been determined that the potential cost savings at Hanford ranges from $194 M to $215 M for Case-1, and $293 M to $324 M for Case-2. The potential cost savings at Savannah River are $186 M for Case-1 and $281 M for Case-2. A discussion of the uncertainty associated with these cost savings estimates can be found in the Discussion and Conclusions section.

DeMuth, S. [Los Alamos National Lab., NM (United States). Technology and Safety Assessment Div.; Kurath, D. [Pacific Northwest National Lab., Richland, WA (United States)

1998-07-30T23:59:59.000Z

444

Development of a right-of-way cost estimation and cost estimate management process framework for highway projects  

E-Print Network (OSTI)

Escalation of right-of-way (ROW) costs have been shown to be a prime contributor to project cost escalation in the highway industry. Two problems contribute to ROW cost escalation: 1) the ROW cost estimation and cost estimate management process generally lacks structure and definition as compared to other areas of cost estimation; and 2) there is a lack of integration and communication between those responsible for ROW cost estimating and those responsible for general project cost estimating. The research for this thesis was preceded by a literature review to establish the basis for the study. Data collection was completed through interviews of seven state highway agencies (SHAs) and two local public agencies (LPAs). The findings of the research are presented in a set of ROW flowcharts which document the steps, inputs, and outputs of the ROW cost estimation and cost estimate management process. Three ROW cost estimates and a cost management process take place throughout project development. An effort was made from the onset of the research to relate the ROW cost estimating and cost estimate management process to the first four project development phases (planning, programming. preliminary design, and final design). There are five flowcharts produced as a result of this research: 1) an agency-level flowchart showing all cost estimates and the interaction of ROW with the project development process; 2) a conceptual ROW cost estimating flowchart which depicts the required steps during planning; 3) a baseline ROW cost estimating flowchart which depicts the required steps during programming; 4) an update ROW cost estimating flowchart which depicts the required steps during preliminary design to include a cost estimate management loop; and 5) a ROW cost management flowchart which depicts the required steps during final design. Although selected SHA contacts provided input following the development of the flowcharts, the flowcharts were only validated to a limited extent due to time and budget constraints. These flowcharts attempt to address the two contributing problems to ROW cost escalation by providing structure to the ROW cost estimation process and by developing the ROW process flowcharts linked to the project development process. Based on the input provided by SHA contacts, the flowcharts appear to have the potential to provide guidance to SHAs in improving the accuracy of ROW cost estimates through addressing these two problems.

Lucas, Matthew Allen

2007-12-01T23:59:59.000Z

445

Comparison of Life Cycle Costs for LLRW Management in Texas  

Science Conference Proceedings (OSTI)

This report documents a comparison of life-cycle costs of an assured isolation facility in Texas versus the life-cycle costs for a traditional belowground low-level radioactive waste disposal facility designed for the proposed site near Sierra Blanca, Texas.

Baird, R. D.; Rogers, B. C.; Chau, N.; Kerr, Thomas A

1999-08-01T23:59:59.000Z

446

Development of a Low-Cost Tide Gauge  

Science Conference Proceedings (OSTI)

A low-cost tide gauge was developed and field tested to demonstrate a technology that would enable more cost-effective and greater sampling of spatially variable water levels and ocean surface waves. The gauge was designed to be adaptable to ...

Mark F. Giardina; Marshall D. Earle; John C. Cranford; Daniel A. Osiecki

2000-04-01T23:59:59.000Z

447

Low-Cost, Lightweight Solar Concentrators  

NLE Websites -- All DOE Office Websites (Extended Search)

Concentrators Concentrators California Institute of Technology/Jet Propulsion Laboratory Award Number:0595-1612 | January 15, 2013 | Ganapathi Thin Film mirror is ~40-50% cheaper and 60% lighter than SOA * Project leverages extensive space experience by JPL and L'Garde to develop a low-cost parabolic dish capable of providing 4 kW thermal. Key features: * Metallized reflective thin film material with high reflectivity (>93%) with polyurethane foam backing * Single mold polyurethane backing fabrication enables low cost high production manufacturing * Ease of panel installation and removal enables repairs and results in a low total life cycle cost * Deployment of multiple dishes enhances system level optimizations by simulating larger fields which addresses issues like shared resources

448

Computerized Energy and Treatment Cost Calculations  

E-Print Network (OSTI)

A computer program has been developed that quickly calculates blowdown heat loss as a function of makeup water, boiler water chemistry, and blowdown recovery equipment. By inputting water analysis, basic system parameters, and type of fuel, the cost of heat loss in the blowdown can be quickly and accurately determined. Present operating systems can quickly be evaluated as to potential cost savings on the addition of a blowdown flash tank and/or a recovery heat exchanger. Proposed systems can be engineered from the start with an eye to decreasing energy loss and saving money. In addition, the proper internal treatment is recommended along with appropriate products. Cost of energy lost in the blowdown is calculated based on different levels of blowdown heat recovery. Accurate calculations are readily available to make more intelligent decisions on the purchase of recovery equipment, rather than depending on very tedious, potentially inaccurate determinations by long hand.

Trace, W. L.

1981-01-01T23:59:59.000Z

449

Cost effective multimedia courseware development  

Science Conference Proceedings (OSTI)

Multimedia technology offers considerable potential for education though the costs of production of courseware are prohibitive especially in a rapidly changing discipline such as computer science. This paper proposes a cost-effective technique which ...

C. J. Pilgrim; Y. K. Leung; D. D. Grant

1997-06-01T23:59:59.000Z

450

Cost and Impacts of Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

and Policies RESULTS 2010-2025 and long-run impacts 2010-2025 GovernmentIndustry Costs Hydrogen production, infrastructure & cost HyTrans merges the early transition...

451

User cost in oil production  

E-Print Network (OSTI)

The assumption of an initial fixed mineral stock is superfluous and wrong. User cost (resource rent) in mineral production is the present value of expected increases in development cost. It can be measured as the difference ...

Adelman, Morris Albert

1990-01-01T23:59:59.000Z

452

Overview and Low Cost Processing  

Science Conference Proceedings (OSTI)

Mar 4, 2013 ... The major reason that there is not more widespread use of titanium and its alloys is the high cost. Developments in reducing the cost of titanium ...

453

Cost-sensitive classifier evaluation  

Science Conference Proceedings (OSTI)

Evaluating classifier performance in a cost-sensitive setting is straightforward if the operating conditions (misclassification costs and class distributions) are fixed and known. When this is not the case, evaluation requires a method of visualizing ...

Robert C. Holte; Chris Drummond

2005-08-01T23:59:59.000Z

454

Wind Integration Cost and Cost-Causation: Preprint  

DOE Green Energy (OSTI)

The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

2013-10-01T23:59:59.000Z

455

3800 Green Series Cost Elements  

Energy.gov (U.S. Department of Energy (DOE))

Stoller - Legacy ManagementSustainable Acquisition (formerly EPP) Program 3800 Series Cost Elements01/30/2012 (Rev. 4)

456

Empirical Methods of Cost Estimation  

Science Conference Proceedings (OSTI)

...D.P. Hoult and C.L. Meador, Manufacturing Cost Estimating, Materials Selection and Design, Vol 20, ASM Handbook,

457

Bifacial Efficiency at Monofacial Cost  

solar cells; photovoltaics; PV; bifacial efficiency; Monofacial Cost, Bifacial Cells; bifacial Modules; industry growth forum; gamma solar Created ...

458

COST SHARING ON SPONSORED PROJECTS  

E-Print Network (OSTI)

COST SHARING ON SPONSORED PROJECTS 1 California Institute of Technology Issuing Authority: Office is that portion of the total cost of an externally funded project that is not funded by the sponsor. Depending as a demonstration of its commitment to the project. When voluntary cost sharing is included in the proposal budget

Tai, Yu-Chong

459

Life cycle cost and risk estimation of environmental management options  

SciTech Connect

The evaluation process is demonstrated in this paper through comparative analysis of two alternative scenarios identified for the management of the alpha-contaminated fixed low-level waste currently stored at INEL. These two scenarios, the Base Case and the Delay Case, are realistic and based on actual data, but are not intended to exactly match actual plans currently being developed at INEL. Life cycle cost estimates were developed for both scenarios using the System Cost Model; resulting costs are presented and compared. Life cycle costs are shown as a function of time and also aggregated by pretreatment, treatment, storage, and disposal activities. Although there are some short-term cost savings for the Delay Case, cumulative life cycle costs eventually become much higher than costs for the Base Case over the same period of time, due mainly to the storage and repackaging necessary to accommodate the longer Delay Case schedule. Life cycle risk estimates were prepared using a new risk analysis method adapted to the System Cost Model architecture for automated, systematic cost/risk applications. Relative risk summaries are presented for both scenarios as a function of time and also aggregated by pretreatment, treatment, storage, and disposal activities. Relative risk of the Delay Case is shown to be higher than that of the Base Case. Finally, risk and cost results are combined to show how the collective information can be used to help identify opportunities for risk or cost reduction and highlight areas where risk reduction can be achieved most economically.

Shropshire, D.; Sherick, M.

1996-04-01T23:59:59.000Z

460

Predicted costs of environmental controls for a commercial oil shale industry. Volume II. A subjective self-assessment of uncertainty in the predicted costs  

SciTech Connect

The uncertainties in Volume I without extensive additional engineering effort were identified and quantified. Substantial uncertainty was found in several critical variables, allowing a broad range of possible values. Calculations of the cost impact associated with such broad ranges, however, did not always result in significant differences. Seven major areas of pollution control activity were judged to warrant the assessment effort. Three of these areas were found to contain significant uncertainty and additional research is suggested. These areas are: H/sub 2/S removal from the retort gas stream (Stretford process); organic removal from process wastewaters (bio-oxidation or other alternatives); and slurry backfilling of spent Modified In Situ (MIS) retorts. The overall results of the assessment and analysis process are summarized in Table 1-1 in terms of total cost for pollution control. The distributions have been divided into three ranges in this table. A center range is given which contains 80% to 90% probability, and the costs outside this range with probabilities are given. The full distributions can be found in Section 5.0. The subjective probability distributions are a quantification of opinion. The probability of encountering costs below the low figure or above the high figure for each process and scenario is judged to be nearly zero.

Jovanovich, A.P.; Stone, M.L.; Taylor, G.C.

1979-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Assessment of light water reactor power plant cost and ultra-acceleration depreciation financing  

E-Print Network (OSTI)

Although in many regions of the U.S. the least expensive electricity is generated from light-water reactor (LWR) plants, the fixed (capital plus operation and maintenance) cost has increased to the level where the cost ...

El-Magboub, Sadek Abdulhafid.

462

Figure 1. "Brian 2.0" a Socially Assistive Robot playing a card memory game with a person.  

E-Print Network (OSTI)

as the main processing unit through a designed software package. This system will be able to be integrated for position tracking · Weight sensing · Capacitive sensing · Two tray system with load cell array to track computer for analysis Figure 3. ­ Easy to use interface #12;

Sun, Yu

463

Development of Figure of Merits (FOMs) for Intermediate Coolant Characterization and Selection  

Science Conference Proceedings (OSTI)

This paper focuses on characterization of several coolant performances in the IHTL. There are lots of choices available for the IHTL coolants; gases, liquid metals, molten salts, and etc. Traditionally, the selection of coolants is highly dependent on engineer's experience and decisions. In this decision, the following parameters are generally considered: melting point, vapor pressure, density, thermal conductivity, heat capacity, viscosity, and coolant chemistry. The followings are general thermal-hydraulic requirements for the coolant in the IHTL: (1) High heat transfer performance - The IHTL coolant should exhibit high heat transfer performance to achieve high efficiency and economics; (2) Low pumping power - The IHTL coolant requires low pumping power to improve economics through less stringent pump requirements; (3) Low amount of coolant volume - The IHTL coolant requires less coolant volume for better economics; (4) Low amount of structural materials - The IHTL coolant requires less structural material volume for better economics; (5) Low heat loss - The IHTL requires less heat loss for high efficiency; and (6) Low temperature drop - The IHTL should allow less temperature drop for high efficiency. Typically, heat transfer coolants are selected based on various fluid properties such as melting point, vapor pressure, density, thermal conductivity, heat capacity, viscosity, and coolant chemistry. However, the selection process & results are highly dependent on the engineer's personal experience and skills. In the coolant selection, if a certain coolant shows superior properties with respect to the others, the decision will be very straightforward. However, generally, each coolant material exhibits good characteristics for some properties but poor for the others. Therefore, it will be very useful to have some figures of merits (FOMs), which can represent and quantify various coolant thermal performances in the system of interest. The study summarized in this paper focuses on developing general FOMs for the IHTL coolant selection and shows some estimation results.

Eung Soo Kim; Piyush Sabharwall; Nolan Anderson

2011-06-01T23:59:59.000Z

464

Cost Analysis of Proposed National Regulation of Coal Combustion Residuals from the Electric Generating Industry  

Science Conference Proceedings (OSTI)

This analysis quantifies the potential cost to the coal-fired electric generation industry from EPA's proposed rule on the disposal of coal combustion residuals. It includes an assessment of the incremental compliance costs of the Subtitle C proposed regulatory option. Costs for this analysis were developed at the individual generating unit and plant level and aggregated to develop a national industry cost estimate. The analytical model used to estimate the costs utilizes a Monte Carlo framework to accou...

2010-11-17T23:59:59.000Z

465

17.2 - Cost Participation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17.2 (June 2004) 17.2 (June 2004) 1 Cost Participation [Reference: FAR 35.003(b), DEAR 917.70] Overview This section discusses DOE treatment of cost participation by organizations performing research, development, and demonstration projects under DOE prime contracts. This section does not cover efforts and projects performed for DOE by other Federal agencies. Background Cost participation is a generic term denoting any situation where the Government does not fully reimburse the contractor for all allowable costs necessary to accomplish the project or effort under the contract. The term includes, but is not limited to: * Cost Sharing * Cost Matching * Cost Limitation, which may be direct or indirect * Participation in-kind

466

Lightweighting Impacts on Fuel Economy, Cost, and Component Losses  

DOE Green Energy (OSTI)

The Future Automotive Systems Technology Simulator (FASTSim) is the U.S. Department of Energy's high-level vehicle powertrain model developed at the National Renewable Energy Laboratory. It uses a time versus speed drive cycle to estimate the powertrain forces required to meet the cycle. It simulates the major vehicle powertrain components and their losses. It includes a cost model based on component sizing and fuel prices. FASTSim simulated different levels of lightweighting for four different powertrains: a conventional gasoline engine vehicle, a hybrid electric vehicle (HEV), a plug-in hybrid electric vehicle (PHEV), and a battery electric vehicle (EV). Weight reductions impacted the conventional vehicle's efficiency more than the HEV, PHEV and EV. Although lightweighting impacted the advanced vehicles' efficiency less, it reduced component cost and overall costs more. The PHEV and EV are less cost effective than the conventional vehicle and HEV using current battery costs. Assuming the DOE's battery cost target of $100/kWh, however, the PHEV attained similar cost and lightweighting benefits. Generally, lightweighting was cost effective when it costs less than $6/kg of mass eliminated.

Brooker, A. D.; Ward, J.; Wang, L.

2013-01-01T23:59:59.000Z

467

Total capital cost data base: 10MWe Solar Thermal Central Receiver Pilot Plant  

DOE Green Energy (OSTI)

This report describes the total capital cost data base of the 10 MWe Solar Thermal Central Receiver Pilot Plant. This Solar One cost data base was created using the computer code ''Cost Data Management System (CDMS)''. The cost data base format was developed to be used as a common method of presentation of capital costs for power plants. The basic format is a plant system cost breakdown structure. Major accounts are land; structures and improvements; collector, receiver, thermal transport, thermal storage, and stream generation systems; turbine plant; electrical plant; miscellaneous plant systems and equipment; and plant-level indirect costs. Each major account includes subaccounts to as many as nine level of detail. The data base can be accessed to provide elements-of-work costs at any subaccount level or at the plant level. The elements-of-work include sitework/earthwork; concrete work; metal work; architectural; process equipment; piping; electrical; and miscellaneous work. Each of these elements-of-work can be or are broken into finer detail and costs can be accumulated to identify more specific needs, e.g., pipe insulation or heat exchangers. The cost data base can be accessed and various reports can be generated. These vary from a single page summary to detailed listings of costs and notes. Reported costs can be stated in dollars, dollars per kilowatt or percentage of the total plant cost. Reports or samples of reports for the pilot plant capital cost are included.

Norris, H.F. Jr.

1986-05-01T23:59:59.000Z

468

GUIDE TO NUCLEAR POWER COST EVALUATION. VOLUME 4. FUEL CYCLE COSTS  

SciTech Connect

Information on fuel cycle cost is presented. Topics covered include: nuclear fuel, fuel management, fuel cost, fissionable material cost, use charge, conversion and fabrication costs, processing cost, and shipping cost. (M.C.G.)

1962-03-15T23:59:59.000Z

469

Electric Demand Cost Versus Labor Cost: A Case Study  

E-Print Network (OSTI)

Electric Utility companies charge industrial clients for two things: demand and usage. Depending on type of business and hours operation, demand cost could be very high. Most of the operations scheduling in a plant is achieved considering labor cost. For small plants, it is quite possible that a decrease in labor could result in an increase in electric demand and cost or vice versa. In this paper two cases are presented which highlight the dependence of one on other.

Agrawal, S.; Jensen, R.

1998-04-01T23:59:59.000Z

470

Today in Energy - High airline jet fuel costs prompt cost ...  

U.S. Energy Information Administration (EIA)

Energy Information Administration ... and idling time. ... Delta stated that it anticipates cost savings of $300 million per year as a result of this ...

471

A cost analysis model for heavy equipment  

Science Conference Proceedings (OSTI)

Total cost is one of the most important factors for a heavy equipment product purchase decision. However, the different cost views and perspectives of performance expectations between the different involved stakeholders may cause customer relation problems ... Keywords: Cost responsibilities, Operating costs, Ownership costs, Post-Manufacturing Product Cost (PMPC), System life-cycle cost

Shibiao Chen; L. Ken Keys

2009-05-01T23:59:59.000Z

472

An Explanation of F&A Costs What are F&A Costs?  

E-Print Network (OSTI)

An Explanation of F&A Costs What are F&A Costs? Costs involved in conducting sponsored projects costs and F&A costs together are the actual cost of a sponsored project. Direct costs are "those costs, indirect costs cannot be specifically attributed to an individual project. For example, it is difficult

473

Hydrogen refueling station costs in Shanghai  

E-Print Network (OSTI)

tool to compare existing cost estimates from the literature,It compiles and organizes cost estimates obtained from aE. Hydrogen supply: cost estimate for hydrogen pathways—

Weinert, Jonathan X.; Shaojun, Liu; Ogden, Joan M; Jianxin, Ma

2007-01-01T23:59:59.000Z

474

Preemptive scheduling with position costs  

E-Print Network (OSTI)

horizon is divided into time periods. In these models, the whole production is not processed in a single period, and production and holding costs are introduced ...

475

Biodiesel Performance, Costs, and Use  

U.S. Energy Information Administration (EIA)

Biodiesel Performance, Costs, and Use. by Anthony Radich. Introduction. The idea of using vegetable oil for fuel has been around as long as the diesel engine.

476

HTGR Cost Model Users' Manual  

Science Conference Proceedings (OSTI)

The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

A.M. Gandrik

2012-01-01T23:59:59.000Z

477

WSRC Nuclear Materials Cost Module  

National Nuclear Security Administration (NNSA)

Office (GAO) WSRC NM Cost Module Generates WSRC monthly and fiscal year to date Inventory and Manufacturing Statement for government owned accountable nuclear materials....

478

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling  

E-Print Network (OSTI)

Low Cost Carbon Fiber Production Carbon Fiber Manufacturing Cost Modeling Oak Ridge National been identified by carbon fiber manufacturers as a market with substantial growth potential. When manufactured with carbon fiber as opposed to traditional materials such as steel, automotive parts are able

479

Strategic cost-benefit analysis of energy policies: detailed projections  

DOE Green Energy (OSTI)

Current US energy policy includes many programs directed toward restructuring the energy system in order to decrease US dependence on foreign supplies and to increase our reliance on plentiful and environmentally benign energy forms. However, recent events have led to renewed concern over the direction of current energy policy. This study describes three possible energy strategies and analyzes each in terms of its economic, environmental, and national security benefits and costs. Each strategy is represented by a specific policy. In the first, no additional programs or policies are initiated beyond those currently in effect or announced. The second is directed toward reducing the growth in energy demand, i.e., energy conservation. The third promotes increased domestic supply through accelerated development of synthetic and unconventional fuels. The analysis focuses on the evaluation and comparison of these strategy alternatives with respect to their energy, economic, and environmental consequences. Results indicate that conservation can substantially reduce import dependence and slow the growth of energy demand, with only a small macroeconomic cost and with substantial environmental benefits; the synfuels policy reduces imports by a smaller amount, does not reduce the growth in energy demand, involves substantial environmental costs and slows the rate of economic growth. These relationships could be different if the energy savings per unit cost for conservation are less than anticipated, or if the costs of synthetic fuels can be significantly lowered. Given these uncertainties, both conservation and RD and D support for synfuels should be included in future energy policy. However, between these policy alternatives, conservation appears to be the preferred strategy. The results of this study are presented in three reports (see also BNL--51105 and BNL--51128). 11 references, 3 figures, 61 tables.

Davitian, H.; Groncki, P.J.; Kleeman, P.; Lukachinski, J.

1979-10-01T23:59:59.000Z

480

Figure A.9 Technical drawings of the plastic holder end for the iron cores in the ferrofluid-magnetic pipet.  

E-Print Network (OSTI)

Field intensity in the air gap of a core as a function of current and type of material comprising Field flux den- sity B weber/m2 = Tesla (T) Gauss (G) = maxwell/cm2 1 T = 104 G Field flux weber 8 0 2 4 6 8 10 12 applied current in Amps percenterrorfromidealairgapfield 4 3 2 #12;64 Figure A.3

Note: This page contains sample records for the topic "levelized cost figures" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

10 MWe Solar Thermal Central Receiver Pilot Plant total capital cost  

DOE Green Energy (OSTI)

A detailed breakdown of the capital cost of the 10 MWe Solar Thermal Central Receiver Pilot Plant located near Barstow, California is presented. The total capital requirements of the pilot plant are given in four cost breakdown structures: (1) project costs (research and development, design, factory, construction, and start-up); (2) plant system costs (land, structures and improvements, collector system, receiver system, thermal transport system, thermal storage system, turbine-generator plant system, electrical plant system, miscellaneous plant equipment, and plant level); (3) elements of work costs (sitework/earthwork, concrete work, metal work, architectural work, process equipment, piping and electrical work); and (4) recurring and non-recurring costs. For all four structures, the total capital cost is the same ($141,200,000); however, the allocation of costs within each structure is different. These cost breakdown structures have been correlated to show the interaction and the assignment of costs for specific areas.

Norris, H.F. Jr.

1985-02-01T23:59:59.000Z

482

Cost prediction for ray shooting  

Science Conference Proceedings (OSTI)

The ray shooting problem arises in many different contexts. For example, solving it efficiently would remove a bottleneck when images are ray-traced in computer graphics. Unfortunately, theoretical solutions to the problem are not very practical, ... Keywords: average performance, cost model, cost prediction, octree, ray shooting, space decomposition

Boris Aronov; Hervé Brönnimann; Allen Y. Chang; Yi-Jen Chiang

2002-06-01T23:59:59.000Z

483

arXiv:1004.0236v1[astro-ph.CO]1Apr2010 Figures of merit for present and future dark energy probes  

E-Print Network (OSTI)

arXiv:1004.0236v1[astro-ph.CO]1Apr2010 Figures of merit for present and future dark energy probes constraints on dynamical dark energy models from Type Ia supernovae and the cosmic microwave background using figures of merit based on the volume of the allowed dark energy parameter space. For a two-parameter dark

Hu, Wayne

484

Zevenhoven & Kilpinen PARTICULATES 4.2.2004 5-33 Figure 5.33 Baghouse filter systems based on inside out (left)  

E-Print Network (OSTI)

those from fluidised bed combustion, or gasification (Scott and Carpenter, 1996). For temperatures below-44 Figure 5.44 Options for HTHP gasification fuel gas cleaning (picture from Mitchell, 1997) Figure 5.43 Typical HTHP gas cleaning system for gasification product gas (picture from ETSU, 1998) 5.11 High

Zevenhoven, Ron

485

Audit Costs for the 1986 Texas Energy Cost Containment Program  

E-Print Network (OSTI)

Direct program costs for detailed audits of 13.5 million square feet of institutional building space in the 1986 Texas Energy Cost Containment Program were $0.047/SF. The building area was 63 percent simple (offices, schools, and universities) and 37 percent complex (medical buildings and power plants). Allowing for the influence of one large facility which received less-extensive treatment due to previous work, thorough audits were obtained for an average cost of $0.050/SF. Large medical buildings (greater than about 170,000 square feet) were audited for $0.050/SF or less, and program costs for survey audits of 17.2 million square feet were $0.0028/SF. The effect on audit costs of complexity of recommended modifications, amount of savings determined, amount of implementation costs, building size, and building complexity are discussed. Primary effects on audit costs are size and complexity of buildings. Program guidelines limited consideration of projects with greater than a four year payback.

Heffington, W. M.; Lum, S. K.; Bauer, V. A.; Turner, W. D.

1987-01-01T23:59:59.000Z

486

Market failures, consumer preferences, and transaction costs in energy efficiency purchase decisions  

E-Print Network (OSTI)

determine their levelized costs per kWh saved. For any givenCFL Wattage Elec Cost per kWh Lifetime (Hours) Hours of UseAnnual Energy Cost, Elec per w/ Gas WH Water kWh Elec Elec

Sathaye, Jayant; Murtishaw, Scott

2004-01-01T23:59:59.000Z

487

Energy Cost Calculator for Faucets and Showerheads | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Faucets and Showerheads Faucets and Showerheads Energy Cost Calculator for Faucets and Showerheads October 8, 2013 - 2:35pm Addthis Vary utility cost, hours of operation, and /or efficiency level. INPUT SECTION Input the following data (if any parameter is missing, calculator will set to the default value). Defaults Water Saving Product Faucet Showerhead Faucet Showerhead Flow Rate gpm 2.2 gpm 2.5 gpm Water Cost (including waste water charges) $/1000 gal $4/1000 gal $4/1000 gal Gas Cost $/therm 0.60 $/therm 0.60 $/therm Electricity Cost $/kWh 0.06 $/kWh 0.06 $/kWh Minutes per Day of Operation minutes 30 minutes 20 minutes Days per Year of Operation days 260 days 365 days Quantity to be Purchased unit(s) 1 unit 1 unit Calculate Reset

488

Disposal Cost Savings Considerations in Curie Reduction Programs  

Science Conference Proceedings (OSTI)

In 1996, the Low Level Radioactive Waste (LLW) Disposal Facility in Barnwell, South Carolina, announced a new fee structure for the disposal of radioactive wastes based on waste density, dose rate, and activity (curies). This report provides a detailed discussion of the current Barnwell Disposal Fee Structure along with its cost impact on various types of wastes generated. The report also evaluates various curie reduction options, their practical application, and their cost savings potential to help LLW ...

1998-03-30T23:59:59.000Z

489

The Costs of Reducing Electricity Sector CO2 Emissions  

Science Conference Proceedings (OSTI)

This report presents a high-level analysis of some of the critical challenges associated with cutting United States electricity-sector CO2 emissions and an order of magnitude feeling for what it will cost to meet emission-reduction targets now under consideration. Three basic strategies to limit emissions are illustrated to give readers a basic understanding of the tradeoff between CO2 reductions and additional cost inherent in several generation choices. Regional power market system simulations are then...

2007-12-20T23:59:59.000Z

490

Cost and quality of fuels for electric plants 1993  

Science Conference Proceedings (OSTI)

The Cost and Quality of Fuels for Electric Utility Plants (C&Q) presents an annual summary of statistics at the national, Census division, State, electric utility, and plant levels regarding the quantity, quality, and cost of fossil fuels used to produce electricity. The purpose of this publication is to provide energy decision-makers with accurate and timely information that may be used in forming various perspectives on issues regarding electric power.

Not Available

1994-07-01T23:59:59.000Z

491

1987; Wu, and Hickey, 1996). Therefore, fermenters and acetogens live syntrophically with hydrogen consumers that keep the H2 levels low (Figure 7).  

E-Print Network (OSTI)

, MDI is home to Acadia National Park (ANP), with numerous rocky beaches, ocean cliffs, and coastal bluffs. The flora of ANP was recently reviewed by Greene et al. (2005). The island is approximately 470 m­2005 from National Oceanic and Atmospheric Administration weather station 170100/ 99999 located in ANP. Soil

Alvarez, Pedro J.

492

Wisconsin Energy and Cost Savings for New Single- and Multifamily Homes  

NLE Websites -- All DOE Office Websites (Extended Search)

WISCONSIN UNIFORM DWELLING CODE WISCONSIN UNIFORM DWELLING CODE Wisconsin Energy and Cost Savings for New Single- and Multifamily Homes: 2009 and 2012 IECC as Compared to the Wisconsin Uniform Dwelling Code BUILDING TECHNOLOGIES PROGRAM 2 2009 AND 2012 IECC AS COMPARED TO THE WISCONSIN UNIFORM DWELLING CODE Figure 1. Wisconsin Climate Zones Wisconsin Energy and Cost Savings for New Single- and Multifamily Homes: 2009 and 2012 IECC as Compared to the Wisconsin Uniform Dwelling Code The 2009 and 2012 International Energy Conservation Codes (IECC) yield positive benefits for Wisconsin homeowners. Moving to either the 2009 or 2012 IECC from the current Wisconsin state code is cost-effective over a 30-year life cycle. On average, Wisconsin homeowners will save $2,484 over 30 years under the 2009 IECC, with savings still higher at $10,733

493

Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review  

DOE Green Energy (OSTI)

This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

Ruth, M.

2011-10-01T23:59:59.000Z

494

Energy Storage Cost Data Base - Version 1.0  

Science Conference Proceedings (OSTI)

The Energy Storage Cost Data Base Version 1.0 is a prototype reference tool built on an Excel spreadsheet that contains cost and performance data sheets for a variety of energy storage systems. The tool enables utility engineers to screen and select specific storage systems from the data base and perform financial analysis such as levelized cost of electricity (LCOE) and to prepare a financial ProForma based on the selected storage system. The Data Base was first released in 2010 and updated in ...

2012-11-05T23:59:59.000Z

495

Theoretical, Methodological, and Empirical Approaches to Cost Savings: A Compendium  

Science Conference Proceedings (OSTI)

This publication summarizes and contains the original documentation for understanding why the U.S. Department of Energy's (DOE's) privatization approach provides cost savings and the different approaches that could be used in calculating cost savings for the Tank Waste Remediation System (TWRS) Phase I contract. The initial section summarizes the approaches in the different papers. The appendices are the individual source papers which have been reviewed by individuals outside of the Pacific Northwest National Laboratory and the TWRS Program. Appendix A provides a theoretical basis for and estimate of the level of savings that can be" obtained from a fixed-priced contract with performance risk maintained by the contractor. Appendix B provides the methodology for determining cost savings when comparing a fixed-priced contractor with a Management and Operations (M&O) contractor (cost-plus contractor). Appendix C summarizes the economic model used to calculate cost savings and provides hypothetical output from preliminary calculations. Appendix D provides the summary of the approach for the DOE-Richland Operations Office (RL) estimate of the M&O contractor to perform the same work as BNFL Inc. Appendix E contains information on cost growth and per metric ton of glass costs for high-level waste at two other DOE sites, West Valley and Savannah River. Appendix F addresses a risk allocation analysis of the BNFL proposal that indicates,that the current approach is still better than the alternative.

M Weimar

1998-12-10T23:59:59.000Z

496

Cost | OpenEI Community  

Open Energy Info (EERE)

Cost Cost Home Ocop's picture Submitted by Ocop(5) Member 18 April, 2013 - 13:41 MHK LCOE Reporting Guidance Draft Cost Current DOE LCOE numerical modeling Performance Tidal Wave To normalize competing claims of LCOE, DOE has developed-for its own use-a standardized cost and performance data reporting process to facilitate uniform calculation of LCOE from MHK device developers. This standardization framework is only the first version in what is anticipated to be an iterative process that involves industry and the broader DOE stakeholder community. Multiple files are attached here for review and comment.Upload Files: application/vnd.openxmlformats-officedocument.wordprocessingml.document icon device_performance_validation_data_request.docx application/vnd.openxmlformats-officedocument.spreadsheetml.sheet icon

497

Cost Effective Water Heating Solutions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ELECTRIC 0.92 ELECTRIC 0.92 ELECTRIC HPWH(2) HPWH(3) HPWH Standard 0.62 EF WH unless high natural gas costs (>1.50therm), in which case recommendations consistent with new...

498

Preemptive scheduling with position costs  

E-Print Network (OSTI)

imization of the sum of the position costs of all the jobs, which will be denoted by. ??fi in the ?-field of the ..... http://www-poleia.lip6.fr/~sourd/project/position. 5 ...

499

Engineering Cost Analysis - Chapter 17  

NLE Websites -- All DOE Office Websites (Extended Search)

of these is that costs over the life of the project must be estimated based on some forecast, and forecasts have proven to be highly variable and frequently inaccurate. The...

500

Production Cost Optimization Project 2010  

Science Conference Proceedings (OSTI)

The EPRI Production Cost Optimization project assists participating members in implementing or enhancing heat rate optimization programs to reduce production costs through sustainable performance improvements. This Technical Update summarizes the status of the project and presents results for five (5) sites that have completed initial and follow-up assessments. A PCO assessment consists of benchmarking plant thermal performance using historical plant data along with an on-site performance appraisal to id...

2010-12-22T23:59:59.000Z