Powered by Deep Web Technologies
Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Investigation of the evolution of single domain ,,111...B CdTe films by molecular beam epitaxy on miscut ,,001...Si substrate  

E-Print Network [OSTI]

Investigation of the evolution of single domain ,,111...B CdTe films by molecular beam epitaxy; accepted for publication 22 July 1998 A comprehensive view of the microstructure of 111 B CdTe films grown and scanning transmission electron microscopy. It is found that in the initial growth stage, CdTe nucleates

Pennycook, Steve

2

Data:3c07fd3a-ff19-4325-a8d4-d1e1a111b09a | Open Energy Information  

Open Energy Info (EERE)

fd3a-ff19-4325-a8d4-d1e1a111b09a fd3a-ff19-4325-a8d4-d1e1a111b09a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cornell, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Gs-1 General Service Three Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0644 per kilowatt-hour.

3

Economic impact analysis for proposed emission standards and guidelines for municipal waste combustors: A description of the basis for, and impacts of, proposed revisions to air pollutant emission regulations for new and existing municipal waste combustors under Clean Air Act Sections 111(b), 111(d), and 129. Final report  

SciTech Connect (OSTI)

EPA is proposing revised and expanded air pollutant emission standards for new, and guidelines for existing, municipal waste combustors (MWCs), pursuant to Sections 111(b), 111(d), and 129 of the Clean Air Act of 1990. The regulations will replace or supplement those promulgated by EPA on February 11, 1991. The standards and guidelines will apply to MWCs with a capacity to combust 35 or more Mg of municipal solid waste per day. The pollutants to be regulated are particulate matter (total and fine), opacity, sulfur dioxide, hydrogen chloride, oxides of nitrogen, carbon monoxide, lead, cadmium mercury, and dibenzofurans and dioxins. The report describes the standards and guidelines, their potential economic impacts, and related matters. EPA estimates the national annual cost of the standards in 1994 will be $44 million, plus the cost of the 1991 standards, $157 million, for a total of $201 million. EPA estimates the equivalent cost of the guidelines at $280 million plus $168 million for a total of $448 million.

Jellicorse, B.L.; Dempsey, J.L.

1994-03-01T23:59:59.000Z

4

Colors of Objects in the Field of the Double Quasi-Stellar Object 1146+111B,C  

Science Journals Connector (OSTI)

...exposures of five calibration standard stars, were obtained under photo-metric conditions...scenar-io must involve predominantly dark (no stars) matter. We first outline the search...measured the apparent brightness ofall stars and galaxies in the field, a total of...

J. ANTHONY TYSON; CRAIG A. GULLIXSON

1986-09-12T23:59:59.000Z

5

Data:F111b665-5c77-40a0-a0af-241b4c7e1c9b | Open Energy Information  

Open Energy Info (EERE)

1b665-5c77-40a0-a0af-241b4c7e1c9b 1b665-5c77-40a0-a0af-241b4c7e1c9b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Norris Public Power District Effective date: 2012/01/20 End date if known: Rate name: SCHEDULE 9 - SCHOOLS AND CHURCHES - ALL-ELECTRIC Sector: Commercial Description: summer is june 15th to oct 15th. Available to schools and churches within the District's service area, which use electricity exclusively for all normal uses, including electric space and water heating. Source or reference: http://www.norrisppd.com/downloads/Schedule%209%20-%20Schools%20and%20Churches%20-%20All-Electric.pdf

6

b041.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

00) 00) 7/2 - I (J P ) = 0( 7 2 - ) Status: ∗∗∗∗ Discovered by COOL 66 and by WOHL 66. Most of the results published before 1973 are now obsolete and have been omitted. They may be found in our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). This entry only includes results from partial-wave analyses. Param- eters of peaks seen in cross sections and in invariant-mass distribu- tions around 2100 MeV used to be listed in a separate entry immedi- ately following. It may be found in our 1986 edition Physics Letters 170B 170B 170B 170B 1 (1986). Λ(2100) MASS Λ(2100) MASS Λ(2100) MASS Λ(2100) MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 2090 to 2110 (≈ 2100) OUR ESTIMATE 2090 to 2110 (≈ 2100) OUR ESTIMATE 2090 to 2110 (≈ 2100) OUR ESTIMATE 2090 to 2110 (≈ 2100) OUR ESTIMATE 2104± 10 GOPAL 80 DPWA K N → K N 2106± 30 DEBELLEFON 78 DPWA K N → K N 2110± 10 GOPAL 77 DPWA K N multichannel 2105±

7

b046.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

15) 15) 5/2 + I (J P ) = 1( 5 2 + ) Status: ∗∗∗∗ Discovered by COOL 66. For results published before 1974 (they are now obsolete), see our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). This entry only includes results from partial-wave analyses. Parame- ters of peaks seen in cross sections and invariant-mass distributions in this region used to be listed in in a separate entry immediately following. They may be found in our 1986 edition Physics Letters 170B 170B 170B 170B 1 (1986). Σ (1915) MASS Σ (1915) MASS Σ (1915) MASS Σ (1915) MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1900 to 1935 (≈ 1915) OUR ESTIMATE 1900 to 1935 (≈ 1915) OUR ESTIMATE 1900 to 1935 (≈ 1915) OUR ESTIMATE 1900 to 1935 (≈ 1915) OUR ESTIMATE 1937± 20 ALSTON-... 78 DPWA K N → K N 1894± 5 1 CORDEN 77C K - n → Σ π 1909± 5 1 CORDEN 77C K - n → Σ π 1920± 10 GOPAL 77 DPWA K N multichannel 1900± 4 2 CORDEN 76 DPWA

8

b041.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 Λ(2100) 7/2 - I (J P ) = 0( 7 2 - ) Status: ∗∗∗∗ Discovered by COOL 66 and by WOHL 66. Most of the results NODE=B041 published before 1973 are now obsolete and have been omitted. They may be found in our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). This entry only includes results from partial-wave analyses. Param- eters of peaks seen in cross sections and in invariant-mass distribu- tions around 2100 MeV used to be listed in a separate entry immedi- ately following. It may be found in our 1986 edition Physics Letters 170B 170B 170B 170B 1 (1986). Λ(2100) MASS Λ(2100) MASS Λ(2100) MASS Λ(2100) MASS NODE=B041M NODE=B041M VALUE (MeV) DOCUMENT ID TECN COMMENT 2090 to 2110 (≈ 2100) OUR ESTIMATE 2090 to 2110 (≈ 2100) OUR ESTIMATE 2090 to 2110 (≈ 2100) OUR ESTIMATE 2090 to 2110 (≈ 2100) OUR ESTIMATE → UNCHECKED ← 2104 ± 10 GOPAL 80 DPWA K N → K N 2106 ± 30 DEBELLEFON

9

b040.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

70) 70) 1/2 - I (J P ) = 0( 1 2 - ) Status: ∗∗∗∗ The measurements of the mass, width, and elasticity published be- fore 1974 are now obsolete and have been omitted. They were last listed in our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). Λ(1670) MASS Λ(1670) MASS Λ(1670) MASS Λ(1670) MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1660 to 1680 (≈ 1670) OUR ESTIMATE 1660 to 1680 (≈ 1670) OUR ESTIMATE 1660 to 1680 (≈ 1670) OUR ESTIMATE 1660 to 1680 (≈ 1670) OUR ESTIMATE 1677.5± 0.8 1 GARCIA-REC...03 DPWA K N multichannel 1673 ± 2 MANLEY 02 DPWA K N multichannel 1670.8± 1.7 KOISO 85 DPWA K - p → Σ π 1667 ± 5 GOPAL 80 DPWA K N → K N 1671 ± 3 ALSTON-... 78 DPWA K N → K N 1670 ± 5 GOPAL 77 DPWA K N multichannel 1675 ± 2 HEPP 76B DPWA K - N → Σ π 1679 ± 1 KANE 74 DPWA K - p → Σ π 1665 ± 5 PREVOST 74 DPWA K - N → Σ (1385) π * * * We do not use the following data for averages, fits, limits, etc.

10

b044.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3/2 3/2 - I (J P ) = 1( 3 2 - ) Status: ∗∗∗∗ For most results published before 1974 (they are now obsolete), see our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). Results from production experiments are listed separately in the next entry. Σ (1670) MASS Σ (1670) MASS Σ (1670) MASS Σ (1670) MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1665 to 1685 (≈ 1670) OUR ESTIMATE 1665 to 1685 (≈ 1670) OUR ESTIMATE 1665 to 1685 (≈ 1670) OUR ESTIMATE 1665 to 1685 (≈ 1670) OUR ESTIMATE 1673 ± 1 GAO 12 DPWA K N → Λ π 1665.1± 4.1 KOISO 85 DPWA K - p → Σ π 1682 ± 5 GOPAL 80 DPWA K N → K N 1679 ± 10 ALSTON-... 78 DPWA K N → K N 1670 ± 5 GOPAL 77 DPWA K N multichannel 1670 ± 6 HEPP 76B DPWA K - N → Σ π 1685 ± 20 BAILLON 75 IPWA K N → Λ π 1659 + 12 - 5 VANHORN 75 DPWA K - p → Λ π 0 1670 ± 2 KANE 74 DPWA K - p → Σ π * * * We do not use the following data for averages, fits, limits, etc. * * * 1667 or 1668 1 MARTIN 77

11

b064.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

49 49 Page 1 NODE=B064 N(1675) 5/2 - I (J P ) = 1 2 ( 5 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B064 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1675) POLE POSITION N(1675) POLE POSITION N(1675) POLE POSITION N(1675) POLE POSITION NODE=B064215 REAL PART REAL PART REAL PART REAL PART NODE=B064RE NODE=B064RE VALUE (MeV) DOCUMENT ID TECN COMMENT 1655 to 1665 (≈ 1660) OUR ESTIMATE 1655 to 1665 (≈ 1660) OUR ESTIMATE 1655 to 1665 (≈ 1660) OUR ESTIMATE 1655 to 1665 (≈ 1660) OUR ESTIMATE → UNCHECKED ← 1654 ± 4 ANISOVICH 12A DPWA Multichannel 1657 ARNDT 06 DPWA π N → π N, η N 1656 1 HOEHLER 93 ARGD π N → π N 1660 ± 10 CUTKOSKY 80 IPWA π N → π N * * * We do not use the following data for averages,

12

b063.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 Page 1 NODE=B063 N(1535) 1/2 - I (J P ) = 1 2 ( 1 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B063 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1535) BREIT-WIGNER MASS N(1535) BREIT-WIGNER MASS N(1535) BREIT-WIGNER MASS N(1535) BREIT-WIGNER MASS NODE=B063M NODE=B063M VALUE (MeV) DOCUMENT ID TECN COMMENT 1525 to 1545 (≈ 1535) OUR ESTIMATE 1525 to 1545 (≈ 1535) OUR ESTIMATE 1525 to 1545 (≈ 1535) OUR ESTIMATE 1525 to 1545 (≈ 1535) OUR ESTIMATE → UNCHECKED ← 1519 ± 5 ANISOVICH 12A DPWA Multichannel 1547.0 ± 0.7 ARNDT 06 DPWA π N → π N, η N 1550 ± 40 CUTKOSKY 80 IPWA π N → π N 1526 ± 7 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. *

13

b055.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

90) 90) 3/2 - I (J P ) = 0( 3 2 - ) Status: ∗∗∗∗ The measurements of the mass, width, and elasticity published be- fore 1974 are now obsolete and have been omitted. They were last listed in our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). Λ(1690) MASS Λ(1690) MASS Λ(1690) MASS Λ(1690) MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1685 to 1695 (≈ 1690) OUR ESTIMATE 1685 to 1695 (≈ 1690) OUR ESTIMATE 1685 to 1695 (≈ 1690) OUR ESTIMATE 1685 to 1695 (≈ 1690) OUR ESTIMATE 1695.7± 2.6 KOISO 85 DPWA K - p → Σ π 1690 ± 5 GOPAL 80 DPWA K N → K N 1692 ± 5 ALSTON-... 78 DPWA K N → K N 1690 ± 5 GOPAL 77 DPWA K N multichannel 1690 ± 3 HEPP 76B DPWA K - N → Σ π 1689 ± 1 KANE 74 DPWA K - p → Σ π * * * We do not use the following data for averages, fits, limits, etc. * * * 1687 or 1689 1 MARTIN 77 DPWA K N multichannel 1692 ± 4 CARROLL 76 DPWA Isospin-0 total σ Λ(1690) WIDTH Λ(1690) WIDTH Λ(1690) WIDTH

14

b014.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 4 N(1710) 1/2 + I (J P ) = 1 2 ( 1 2 + ) Status: ∗∗∗ Most of the results published before 1975 were last included in our NODE=B014 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). The latest GWU analysis (ARNDT 06) finds no evidence for this resonance. N(1710) BREIT-WIGNER MASS N(1710) BREIT-WIGNER MASS N(1710) BREIT-WIGNER MASS N(1710) BREIT-WIGNER MASS NODE=B014M NODE=B014M VALUE (MeV) DOCUMENT ID TECN COMMENT 1680 to 1740 (≈ 1710) OUR ESTIMATE 1680 to 1740 (≈ 1710) OUR ESTIMATE 1680 to 1740 (≈ 1710) OUR ESTIMATE 1680 to 1740 (≈ 1710) OUR ESTIMATE → UNCHECKED ← 1710 ± 20 ANISOVICH 12A DPWA Multichannel 1700 ± 50 CUTKOSKY 80 IPWA π N → π N 1723 ± 9 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits,

15

b012.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 ∆(1910) 1/2 + I (J P ) = 3 2 ( 1 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B012 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). ∆(1910) BREIT-WIGNER MASS ∆(1910) BREIT-WIGNER MASS ∆(1910) BREIT-WIGNER MASS ∆(1910) BREIT-WIGNER MASS NODE=B012M NODE=B012M VALUE (MeV) DOCUMENT ID TECN COMMENT 1860 to 1910 (≈ 1890) OUR ESTIMATE 1860 to 1910 (≈ 1890) OUR ESTIMATE 1860 to 1910 (≈ 1890) OUR ESTIMATE 1860 to 1910 (≈ 1890) OUR ESTIMATE → UNCHECKED ← 1860 ± 40 ANISOVICH 12A DPWA Multichannel 2067.9 ± 1.7 ARNDT 06 DPWA π N → π N, η N 1910 ± 40 CUTKOSKY 80 IPWA π N → π N 1888 ± 20 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * *

16

b066.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

650) 650) 1/2 - I (J P ) = 1 2 ( 1 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1650) BREIT-WIGNER MASS N(1650) BREIT-WIGNER MASS N(1650) BREIT-WIGNER MASS N(1650) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1645 to 1670 (≈ 1655) OUR ESTIMATE 1645 to 1670 (≈ 1655) OUR ESTIMATE 1645 to 1670 (≈ 1655) OUR ESTIMATE 1645 to 1670 (≈ 1655) OUR ESTIMATE 1651 ± 6 ANISOVICH 12A DPWA Multichannel 1634.7± 1.1 ARNDT 06 DPWA π N → π N, η N 1650 ± 30 CUTKOSKY 80 IPWA π N → π N 1670 ± 8 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1664 ± 2 SHRESTHA 12A DPWA Multichannel 1680 ± 40 ANISOVICH 10 DPWA Multichannel

17

b047.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 Σ (2030) 7/2 + I (J P ) = 1( 7 2 + ) Status: ∗∗∗∗ Discovered by COOL 66 and by WOHL 66. For most results pub- NODE=B047 lished before 1974 (they are now obsolete), see our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). This entry only includes results from partial-wave analyses. Parame- ters of peaks seen in cross sections and invariant-mass distributions around 2030 MeV may be found in our 1984 edition, Reviews of Modern Physics 56 56 56 56 S1 (1984). Σ (2030) MASS Σ (2030) MASS Σ (2030) MASS Σ (2030) MASS NODE=B047M NODE=B047M VALUE (MeV) DOCUMENT ID TECN COMMENT 2025 to 2040 (≈ 2030) OUR ESTIMATE 2025 to 2040 (≈ 2030) OUR ESTIMATE 2025 to 2040 (≈ 2030) OUR ESTIMATE 2025 to 2040 (≈ 2030) OUR ESTIMATE → UNCHECKED ← 2036 ± 5 GOPAL 80 DPWA K N → K N 2038 ± 10 CORDEN 77B K - N → N K ∗ 2040 ± 5 GOPAL 77 DPWA K N multichannel 2030 ± 3 1 CORDEN 76 DPWA K - n → Λ π - 2035 ± 15 BAILLON

18

b040.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0 0 Λ(1670) 1/2 - I (J P ) = 0( 1 2 - ) Status: ∗∗∗∗ The measurements of the mass, width, and elasticity published be- NODE=B040 fore 1974 are now obsolete and have been omitted. They were last listed in our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). Λ(1670) MASS Λ(1670) MASS Λ(1670) MASS Λ(1670) MASS NODE=B040M NODE=B040M VALUE (MeV) DOCUMENT ID TECN COMMENT 1660 to 1680 (≈ 1670) OUR ESTIMATE 1660 to 1680 (≈ 1670) OUR ESTIMATE 1660 to 1680 (≈ 1670) OUR ESTIMATE 1660 to 1680 (≈ 1670) OUR ESTIMATE → UNCHECKED ← 1677.5 ± 0.8 1 GARCIA-REC...03 DPWA K N multichannel 1673 ± 2 MANLEY 02 DPWA K N multichannel 1670.8 ± 1.7 KOISO 85 DPWA K - p → Σ π 1667 ± 5 GOPAL 80 DPWA K N → K N 1671 ± 3 ALSTON-... 78 DPWA K N → K N 1670 ± 5 GOPAL 77 DPWA K N multichannel 1675 ± 2 HEPP 76B DPWA K - N → Σ π 1679 ± 1 KANE 74 DPWA K - p → Σ π 1665 ± 5 PREVOST 74 DPWA K - N → Σ (1385) π * * * We do

19

b064.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

75) 75) 5/2 - I (J P ) = 1 2 ( 5 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1675) BREIT-WIGNER MASS N(1675) BREIT-WIGNER MASS N(1675) BREIT-WIGNER MASS N(1675) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1670 to 1680 (≈ 1675) OUR ESTIMATE 1670 to 1680 (≈ 1675) OUR ESTIMATE 1670 to 1680 (≈ 1675) OUR ESTIMATE 1670 to 1680 (≈ 1675) OUR ESTIMATE 1664 ± 5 ANISOVICH 12A DPWA Multichannel 1674.1± 0.2 ARNDT 06 DPWA π N → π N, η N 1675 ± 10 CUTKOSKY 80 IPWA π N → π N 1679 ± 8 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1679 ± 1 SHRESTHA 12A DPWA Multichannel 1678 ± 5 ANISOVICH 10 DPWA Multichannel

20

b014.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10) 10) 1/2 + I (J P ) = 1 2 ( 1 2 + ) Status: ∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). The latest GWU analysis (ARNDT 06) finds no evidence for this resonance. N(1710) BREIT-WIGNER MASS N(1710) BREIT-WIGNER MASS N(1710) BREIT-WIGNER MASS N(1710) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1680 to 1740 (≈ 1710) OUR ESTIMATE 1680 to 1740 (≈ 1710) OUR ESTIMATE 1680 to 1740 (≈ 1710) OUR ESTIMATE 1680 to 1740 (≈ 1710) OUR ESTIMATE 1710± 20 ANISOVICH 12A DPWA Multichannel 1700± 50 CUTKOSKY 80 IPWA π N → π N 1723± 9 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1662± 7 SHRESTHA 12A DPWA Multichannel 1725±

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

b060.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

60 60 Λ(1890) 3/2 + I (J P ) = 0( 3 2 + ) Status: ∗∗∗∗ For results published before 1974 (they are now obsolete), see our NODE=B060 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). The J P = 3/2 + assignment is consistent with all available data (including polarization) and recent partial-wave analyses. The dom- inant inelastic modes remain unknown. Λ(1890) MASS Λ(1890) MASS Λ(1890) MASS Λ(1890) MASS NODE=B060M NODE=B060M VALUE (MeV) DOCUMENT ID TECN COMMENT 1850 to 1910 (≈ 1890) OUR ESTIMATE 1850 to 1910 (≈ 1890) OUR ESTIMATE 1850 to 1910 (≈ 1890) OUR ESTIMATE 1850 to 1910 (≈ 1890) OUR ESTIMATE → UNCHECKED ← 1897 ± 5 GOPAL 80 DPWA K N → K N 1908 ± 10 ALSTON-... 78 DPWA K N → K N 1900 ± 5 GOPAL 77 DPWA K N multichannel 1894 ± 10 HEMINGWAY 75 DPWA K - p → K N * * * We do not use the following data for averages, fits, limits, etc. * * * 1856 or 1868 1 MARTIN 77 DPWA K N multichannel

22

b038.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

520) 520) 3/2 - I (J P ) = 0( 3 2 - ) Status: ∗∗∗∗ Discovered by FERRO-LUZZI 62; the elaboration in WATSON 63 is the classic paper on the Breit-Wigner analysis of a multichannel resonance. The measurements of the mass, width, and elasticity published be- fore 1975 are now obsolete and have been omitted. They were last listed in our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). Production and formation experiments agree quite well, so they are listed together here. Λ(1520) MASS Λ(1520) MASS Λ(1520) MASS Λ(1520) MASS VALUE (MeV) EVTS DOCUMENT ID TECN COMMENT 1519.5 ± 1.0 OUR ESTIMATE 1519.5 ± 1.0 OUR ESTIMATE 1519.5 ± 1.0 OUR ESTIMATE 1519.5 ± 1.0 OUR ESTIMATE 1519.53± 0.19 OUR AVERAGE 1519.53± 0.19 OUR AVERAGE 1519.53± 0.19 OUR AVERAGE 1519.53± 0.19 OUR AVERAGE 1520.4 ± 0.6 ± 1.5 1 QIANG 10 SPEC e p → e ' K + X (fit to X ) 1517.3 ± 1.5 300 BARBER 80D SPEC γ p → Λ(1520)

23

b011.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5) 5) 5/2 + I (J P ) = 3 2 ( 5 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). ∆(1905) BREIT-WIGNER MASS ∆(1905) BREIT-WIGNER MASS ∆(1905) BREIT-WIGNER MASS ∆(1905) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1855 to 1910 (≈ 1880) OUR ESTIMATE 1855 to 1910 (≈ 1880) OUR ESTIMATE 1855 to 1910 (≈ 1880) OUR ESTIMATE 1855 to 1910 (≈ 1880) OUR ESTIMATE 1861 ± 6 ANISOVICH 12A DPWA Multichannel 1857.8± 1.6 ARNDT 06 DPWA π N → π N, η N 1910 ± 30 CUTKOSKY 80 IPWA π N → π N 1905 ± 20 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1818 ± 8 SHRESTHA 12A DPWA Multichannel 1890 ± 25 1 ANISOVICH 10

24

b015.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

20) 20) 3/2 + I (J P ) = 1 2 ( 3 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1720) BREIT-WIGNER MASS N(1720) BREIT-WIGNER MASS N(1720) BREIT-WIGNER MASS N(1720) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1700 to 1750 (≈ 1720) OUR ESTIMATE 1700 to 1750 (≈ 1720) OUR ESTIMATE 1700 to 1750 (≈ 1720) OUR ESTIMATE 1700 to 1750 (≈ 1720) OUR ESTIMATE 1690 + 70 - 35 ANISOVICH 12A DPWA Multichannel 1763.8± 4.6 ARNDT 06 DPWA π N → π N, η N 1700 ± 50 CUTKOSKY 80 IPWA π N → π N 1710 ± 20 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1720 ± 5 SHRESTHA 12A DPWA Multichannel 1770 ± 100 ANISOVICH 10 DPWA

25

b062.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2 2 N(1520) 3/2 - I (J P ) = 1 2 ( 3 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B062 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1520) BREIT-WIGNER MASS N(1520) BREIT-WIGNER MASS N(1520) BREIT-WIGNER MASS N(1520) BREIT-WIGNER MASS NODE=B062M NODE=B062M VALUE (MeV) DOCUMENT ID TECN COMMENT 1510 to 1520 (≈ 1515) OUR ESTIMATE 1510 to 1520 (≈ 1515) OUR ESTIMATE 1510 to 1520 (≈ 1515) OUR ESTIMATE 1510 to 1520 (≈ 1515) OUR ESTIMATE NEW;→ UNCHECKED ← [1515 to 1525 (≈ 1520) MeV OUR 2013 ESTIMATE] 1517 ± 3 ANISOVICH 12A DPWA Multichannel 1514.5 ± 0.2 ARNDT 06 DPWA π N → π N, η N 1525 ± 10 CUTKOSKY 80 IPWA π N → π N 1519 ± 4 HOEHLER 79 IPWA π N → π N * * * We do not use the following data

26

b117.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 ∆(1920) 3/2 + I (J P ) = 3 2 ( 3 2 + ) Status: ∗∗∗ Most of the results published before 1975 were last included in our NODE=B117 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). The latest GWU analysis (ARNDT 06) finds no evidence for this resonance. ∆(1920) BREIT-WIGNER MASS ∆(1920) BREIT-WIGNER MASS ∆(1920) BREIT-WIGNER MASS ∆(1920) BREIT-WIGNER MASS NODE=B117M NODE=B117M VALUE (MeV) DOCUMENT ID TECN COMMENT 1900 to 1970 (≈ 1920) OUR ESTIMATE 1900 to 1970 (≈ 1920) OUR ESTIMATE 1900 to 1970 (≈ 1920) OUR ESTIMATE 1900 to 1970 (≈ 1920) OUR ESTIMATE → UNCHECKED ← 1900 ± 30 ANISOVICH 12A DPWA Multichannel 1920 ± 80 CUTKOSKY 80 IPWA π N → π N 1868 ± 10 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages,

27

b071.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

71 71 N(2190) 7/2 - I (J P ) = 1 2 ( 7 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B071 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(2190) BREIT-WIGNER MASS N(2190) BREIT-WIGNER MASS N(2190) BREIT-WIGNER MASS N(2190) BREIT-WIGNER MASS NODE=B071M NODE=B071M VALUE (MeV) DOCUMENT ID TECN COMMENT 2100 to 2200 (≈ 2190) OUR ESTIMATE 2100 to 2200 (≈ 2190) OUR ESTIMATE 2100 to 2200 (≈ 2190) OUR ESTIMATE 2100 to 2200 (≈ 2190) OUR ESTIMATE → UNCHECKED ← 2180 ± 20 ANISOVICH 12A DPWA Multichannel 2152.4 ± 1.4 ARNDT 06 DPWA π N → π N, η N 2200 ± 70 CUTKOSKY 80 IPWA π N → π N 2140 ± 12 HOEHLER 79 IPWA π N → π N 2140 ± 40 HENDRY 78 MPWA π N → π N * * * We do not use the following data for averages,

28

b055.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 Λ(1690) 3/2 - I (J P ) = 0( 3 2 - ) Status: ∗∗∗∗ The measurements of the mass, width, and elasticity published be- NODE=B055 fore 1974 are now obsolete and have been omitted. They were last listed in our 1982 edition Physics Letters 111B 111B 111B 111B 1 (1982). Λ(1690) MASS Λ(1690) MASS Λ(1690) MASS Λ(1690) MASS NODE=B055M NODE=B055M VALUE (MeV) DOCUMENT ID TECN COMMENT 1685 to 1695 (≈ 1690) OUR ESTIMATE 1685 to 1695 (≈ 1690) OUR ESTIMATE 1685 to 1695 (≈ 1690) OUR ESTIMATE 1685 to 1695 (≈ 1690) OUR ESTIMATE → UNCHECKED ← 1695.7 ± 2.6 KOISO 85 DPWA K - p → Σ π 1690 ± 5 GOPAL 80 DPWA K N → K N 1692 ± 5 ALSTON-... 78 DPWA K N → K N 1690 ± 5 GOPAL 77 DPWA K N multichannel 1690 ± 3 HEPP 76B DPWA K - N → Σ π 1689 ± 1 KANE 74 DPWA K - p → Σ π * * * We do not use the following data for averages, fits, limits, etc. * * * 1687 or 1689 1 MARTIN 77 DPWA K N multichannel 1692 ± 4 CARROLL 76 DPWA Isospin-0

29

b012.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10) 10) 1/2 + I (J P ) = 3 2 ( 1 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). ∆(1910) BREIT-WIGNER MASS ∆(1910) BREIT-WIGNER MASS ∆(1910) BREIT-WIGNER MASS ∆(1910) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1860 to 1910 (≈ 1890) OUR ESTIMATE 1860 to 1910 (≈ 1890) OUR ESTIMATE 1860 to 1910 (≈ 1890) OUR ESTIMATE 1860 to 1910 (≈ 1890) OUR ESTIMATE 1860 ± 40 ANISOVICH 12A DPWA Multichannel 2067.9± 1.7 ARNDT 06 DPWA π N → π N, η N 1910 ± 40 CUTKOSKY 80 IPWA π N → π N 1888 ± 20 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1934 ± 5 SHRESTHA 12A DPWA Multichannel 1995 ± 12 VRANA 00 DPWA

30

b010.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8 8 Page 1 NODE=B010 ∆(1700) 3/2 - I (J P ) = 3 2 ( 3 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B010 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). ∆(1700) BREIT-WIGNER MASS ∆(1700) BREIT-WIGNER MASS ∆(1700) BREIT-WIGNER MASS ∆(1700) BREIT-WIGNER MASS NODE=B010M NODE=B010M VALUE (MeV) DOCUMENT ID TECN COMMENT 1670 to 1750 (≈ 1700) OUR ESTIMATE 1670 to 1750 (≈ 1700) OUR ESTIMATE 1670 to 1750 (≈ 1700) OUR ESTIMATE 1670 to 1750 (≈ 1700) OUR ESTIMATE → UNCHECKED ← 1715 + 30 - 15 ANISOVICH 12A DPWA Multichannel 1695.0 ± 1.3 ARNDT 06 DPWA π N → π N, η N 1710 ± 30 CUTKOSKY 80 IPWA π N → π N 1680 ± 70 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits,

31

b061.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

440) 440) 1/2 + I (J P ) = 1 2 ( 1 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1440) BREIT-WIGNER MASS N(1440) BREIT-WIGNER MASS N(1440) BREIT-WIGNER MASS N(1440) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1420 to 1470 (≈ 1440) OUR ESTIMATE 1420 to 1470 (≈ 1440) OUR ESTIMATE 1420 to 1470 (≈ 1440) OUR ESTIMATE 1420 to 1470 (≈ 1440) OUR ESTIMATE 1430 ± 8 ANISOVICH 12A DPWA Multichannel 1485.0± 1.2 ARNDT 06 DPWA π N → π N, η N 1440 ± 30 CUTKOSKY 80 IPWA π N → π N 1410 ± 12 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1412 ± 2 SHRESTHA 12A DPWA Multichannel 1440 ± 12 ANISOVICH 10 DPWA Multichannel

32

b065.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

53 53 Page 1 NODE=B065 N(1680) 5/2 + I (J P ) = 1 2 ( 5 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B065 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1680) POLE POSITION N(1680) POLE POSITION N(1680) POLE POSITION N(1680) POLE POSITION NODE=B065215 REAL PART REAL PART REAL PART REAL PART NODE=B065RE NODE=B065RE VALUE (MeV) DOCUMENT ID TECN COMMENT 1665 to 1680 (≈ 1675) OUR ESTIMATE 1665 to 1680 (≈ 1675) OUR ESTIMATE 1665 to 1680 (≈ 1675) OUR ESTIMATE 1665 to 1680 (≈ 1675) OUR ESTIMATE → UNCHECKED ← 1676 ± 6 ANISOVICH 12A DPWA Multichannel 1674 ARNDT 06 DPWA π N → π N, η N 1673 1 HOEHLER 93 ARGD π N → π N 1667 ± 5 CUTKOSKY 80 IPWA π N → π N * * * We do not use the following data for averages,

33

b011.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 ∆(1905) 5/2 + I (J P ) = 3 2 ( 5 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B011 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). ∆(1905) BREIT-WIGNER MASS ∆(1905) BREIT-WIGNER MASS ∆(1905) BREIT-WIGNER MASS ∆(1905) BREIT-WIGNER MASS NODE=B011M NODE=B011M VALUE (MeV) DOCUMENT ID TECN COMMENT 1855 to 1910 (≈ 1880) OUR ESTIMATE 1855 to 1910 (≈ 1880) OUR ESTIMATE 1855 to 1910 (≈ 1880) OUR ESTIMATE 1855 to 1910 (≈ 1880) OUR ESTIMATE → UNCHECKED ← 1861 ± 6 ANISOVICH 12A DPWA Multichannel 1857.8 ± 1.6 ARNDT 06 DPWA π N → π N, η N 1910 ± 30 CUTKOSKY 80 IPWA π N → π N 1905 ± 20 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1818

34

b013.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 3 ∆(1930) 5/2 - I (J P ) = 3 2 ( 5 2 - ) Status: ∗∗∗ Most of the results published before 1975 were last included in our NODE=B013 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). ∆(1930) BREIT-WIGNER MASS ∆(1930) BREIT-WIGNER MASS ∆(1930) BREIT-WIGNER MASS ∆(1930) BREIT-WIGNER MASS NODE=B013M NODE=B013M VALUE (MeV) DOCUMENT ID TECN COMMENT 1900 to 2000 (≈ 1950) OUR ESTIMATE 1900 to 2000 (≈ 1950) OUR ESTIMATE 1900 to 2000 (≈ 1950) OUR ESTIMATE 1900 to 2000 (≈ 1950) OUR ESTIMATE → UNCHECKED ← 2233 ± 53 ARNDT 06 DPWA π N → π N, η N 1940 ± 30 CUTKOSKY 80 IPWA π N → π N 1901 ± 15 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1930 ± 12 SHRESTHA 12A DPWA Multichannel 2046 ± 45

35

b061.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 1 N(1440) 1/2 + I (J P ) = 1 2 ( 1 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B061 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1440) BREIT-WIGNER MASS N(1440) BREIT-WIGNER MASS N(1440) BREIT-WIGNER MASS N(1440) BREIT-WIGNER MASS NODE=B061M NODE=B061M VALUE (MeV) DOCUMENT ID TECN COMMENT 1410 to 1450 (≈ 1430) OUR ESTIMATE 1410 to 1450 (≈ 1430) OUR ESTIMATE 1410 to 1450 (≈ 1430) OUR ESTIMATE 1410 to 1450 (≈ 1430) OUR ESTIMATE NEW;→ UNCHECKED ← [1420 to 1470 (≈ 1440) MeV OUR 2013 ESTIMATE] 1430 ± 8 ANISOVICH 12A DPWA Multichannel 1485.0 ± 1.2 ARNDT 06 DPWA π N → π N, η N 1440 ± 30 CUTKOSKY 80 IPWA π N → π N 1410 ± 12 HOEHLER 79 IPWA π N → π N * * * We do not use the following data

36

b117.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

20) 20) 3/2 + I (J P ) = 3 2 ( 3 2 + ) Status: ∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). The latest GWU analysis (ARNDT 06) finds no evidence for this resonance. ∆(1920) BREIT-WIGNER MASS ∆(1920) BREIT-WIGNER MASS ∆(1920) BREIT-WIGNER MASS ∆(1920) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1900 to 1970 (≈ 1920) OUR ESTIMATE 1900 to 1970 (≈ 1920) OUR ESTIMATE 1900 to 1970 (≈ 1920) OUR ESTIMATE 1900 to 1970 (≈ 1920) OUR ESTIMATE 1900 ± 30 ANISOVICH 12A DPWA Multichannel 1920 ± 80 CUTKOSKY 80 IPWA π N → π N 1868 ± 10 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 2146 ± 32 SHRESTHA 12A DPWA Multichannel

37

b063.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

535) 535) 1/2 - I (J P ) = 1 2 ( 1 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1535) BREIT-WIGNER MASS N(1535) BREIT-WIGNER MASS N(1535) BREIT-WIGNER MASS N(1535) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1525 to 1545 (≈ 1535) OUR ESTIMATE 1525 to 1545 (≈ 1535) OUR ESTIMATE 1525 to 1545 (≈ 1535) OUR ESTIMATE 1525 to 1545 (≈ 1535) OUR ESTIMATE 1519 ± 5 ANISOVICH 12A DPWA Multichannel 1547.0± 0.7 ARNDT 06 DPWA π N → π N, η N 1550 ± 40 CUTKOSKY 80 IPWA π N → π N 1526 ± 7 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1538 ± 1 SHRESTHA 12A DPWA Multichannel 1535 ± 20 ANISOVICH 10 DPWA Multichannel

38

Citation: D.E. Groom  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

N(1535) N(1535) S 11 I (J P ) = 1 2 ( 1 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 are now obsolete and have been omitted. They may be found in our 1982 edition, Physics Letters 111B 111B 111B 111B (1982). N(1535) BREIT-WIGNER MASS N(1535) BREIT-WIGNER MASS N(1535) BREIT-WIGNER MASS N(1535) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1520 to 1555 (≈ 1535) OUR ESTIMATE 1520 to 1555 (≈ 1535) OUR ESTIMATE 1520 to 1555 (≈ 1535) OUR ESTIMATE 1520 to 1555 (≈ 1535) OUR ESTIMATE 1534± 7 MANLEY 92 IPWA π N → π N & N π π 1550±40 CUTKOSKY 80 IPWA π N → π N 1526± 7 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1532± 5 ARMSTRONG 99B DPWA γ ∗ p → p η 1549± 2 ABAEV 96 DPWA π - p → η n 1525±10 ARNDT 96 IPWA γ N → π N 1535 ARNDT 95 DPWA π N → N π 1542± 6 BATINIC 95 DPWA π N → N π, N η 1537 BATINIC 95B DPWA π N →

39

b015.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5 5 N(1720) 3/2 + I (J P ) = 1 2 ( 3 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B015 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1720) BREIT-WIGNER MASS N(1720) BREIT-WIGNER MASS N(1720) BREIT-WIGNER MASS N(1720) BREIT-WIGNER MASS NODE=B015M NODE=B015M VALUE (MeV) DOCUMENT ID TECN COMMENT 1700 to 1750 (≈ 1720) OUR ESTIMATE 1700 to 1750 (≈ 1720) OUR ESTIMATE 1700 to 1750 (≈ 1720) OUR ESTIMATE 1700 to 1750 (≈ 1720) OUR ESTIMATE → UNCHECKED ← 1690 + 70 - 35 ANISOVICH 12A DPWA Multichannel 1763.8 ± 4.6 ARNDT 06 DPWA π N → π N, η N 1700 ± 50 CUTKOSKY 80 IPWA π N → π N 1710 ± 20 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1720 ± 5 SHRESTHA

40

b033.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

33 33 ∆(1232) 3/2 + I (J P ) = 3 2 ( 3 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B033 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). ∆(1232) BREIT-WIGNER MASSES ∆(1232) BREIT-WIGNER MASSES ∆(1232) BREIT-WIGNER MASSES ∆(1232) BREIT-WIGNER MASSES NODE=B033205 MIXED CHARGES MIXED CHARGES MIXED CHARGES MIXED CHARGES NODE=B033M NODE=B033M VALUE (MeV) DOCUMENT ID TECN COMMENT 1230 to 1234 (≈ 1232) OUR ESTIMATE 1230 to 1234 (≈ 1232) OUR ESTIMATE 1230 to 1234 (≈ 1232) OUR ESTIMATE 1230 to 1234 (≈ 1232) OUR ESTIMATE → UNCHECKED ← 1228 ± 2 ANISOVICH 12A DPWA Multichannel 1233.4 ± 0.4 ARNDT 06 DPWA π N → π N, η N 1232 ± 3 CUTKOSKY 80 IPWA π N → π N 1233 ± 2 HOEHLER 79 IPWA π N

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

b071.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

90) 90) 7/2 - I (J P ) = 1 2 ( 7 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(2190) BREIT-WIGNER MASS N(2190) BREIT-WIGNER MASS N(2190) BREIT-WIGNER MASS N(2190) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 2100 to 2200 (≈ 2190) OUR ESTIMATE 2100 to 2200 (≈ 2190) OUR ESTIMATE 2100 to 2200 (≈ 2190) OUR ESTIMATE 2100 to 2200 (≈ 2190) OUR ESTIMATE 2180 ± 20 ANISOVICH 12A DPWA Multichannel 2152.4± 1.4 ARNDT 06 DPWA π N → π N, η N 2200 ± 70 CUTKOSKY 80 IPWA π N → π N 2140 ± 12 HOEHLER 79 IPWA π N → π N 2140 ± 40 HENDRY 78 MPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 2150 ± 26 SHRESTHA 12A DPWA Multichannel

42

b066.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 6 N(1650) 1/2 - I (J P ) = 1 2 ( 1 2 - ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our NODE=B066 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(1650) BREIT-WIGNER MASS N(1650) BREIT-WIGNER MASS N(1650) BREIT-WIGNER MASS N(1650) BREIT-WIGNER MASS NODE=B066M NODE=B066M VALUE (MeV) DOCUMENT ID TECN COMMENT 1645 to 1670 (≈ 1655) OUR ESTIMATE 1645 to 1670 (≈ 1655) OUR ESTIMATE 1645 to 1670 (≈ 1655) OUR ESTIMATE 1645 to 1670 (≈ 1655) OUR ESTIMATE → UNCHECKED ← 1651 ± 6 ANISOVICH 12A DPWA Multichannel 1634.7 ± 1.1 ARNDT 06 DPWA π N → π N, η N 1650 ± 30 CUTKOSKY 80 IPWA π N → π N 1670 ± 8 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1664 ± 2 SHRESTHA

43

b090.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

20) 20) 9/2 + I (J P ) = 1 2 ( 9 2 + ) Status: ∗∗∗∗ Most of the results published before 1975 were last included in our 1982 edition, Physics Letters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1980 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). N(2220) BREIT-WIGNER MASS N(2220) BREIT-WIGNER MASS N(2220) BREIT-WIGNER MASS N(2220) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 2200 to 2300 (≈ 2250) OUR ESTIMATE 2200 to 2300 (≈ 2250) OUR ESTIMATE 2200 to 2300 (≈ 2250) OUR ESTIMATE 2200 to 2300 (≈ 2250) OUR ESTIMATE 2316.3± 2.9 ARNDT 06 DPWA π N → π N, η N 2230 ± 80 CUTKOSKY 80 IPWA π N → π N 2205 ± 10 HOEHLER 79 IPWA π N → π N 2300 ± 100 HENDRY 78 MPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 2270 ± 11 ARNDT 04 DPWA π N → π N, η N 2258 ARNDT 95 DPWA π N → N π N(2220) BREIT-WIGNER

44

ACQUISITION LETTER  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy No. 2001-03 Department of Energy No. 2001-03 Acquisition Regulation Date May 25, 2001 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the Procurement Executives of DOE and NNSA. Subject: COSTS ASSOCIATED WITH WHISTLEBLOWER ACTIONS References: DEAR 931.205-47(h) DEAR 952.216-7, Alt II DEAR 970.3102-05-47(h) DEAR 970.5232-2, Payments and Advances When Does this Acquisition Letter Expire? This Acquisition Letter will expire when this guidance is distributed as an Acquisition Guide section or otherwise superseded. Whom Do You Contact for More Information? Contact Terry Sheppard of the Office of Procurement and Assistance Policy at (202) 586-8193 or terry.sheppard@hq.doe.gov Visit our website at www.pr.doe.gov for information on Acquisition Letters and other policy

45

PARIS LETTER  

Science Journals Connector (OSTI)

...department of Vienna, university, asking if the number of students would not have to be restrictedby introducing a numerus clausus. As I am now informed, the mantle of Auer von. Welsbach's lamp, described already in a previous letter, is...

V.

1886-10-01T23:59:59.000Z

46

ACQUISITION LETTER  

Broader source: Energy.gov (indexed) [DOE]

ACQUISITION LETTER ACQUISITION LETTER AUTHORITY This Acquisition Letter (AL) is issued by the Procurement Executive pursuant to a delegation from the Secretary and under the authority of the Department of Energy Acquisition Regulation (DEAR) subsection 901.301-70. CONTENTS CITATION TITLE DEAR Part 933 Protests, Disputes, and Appeals I. Purpose. This AL establishes policy and provides guidance for the use of alternative dispute resolution techniques in connection with disputes that arise under the Contract Disputes Act (CDA) of 1978, 41 U.S.C. sections 601-613. This AL revision deletes references to "district court" which were incorrectly cited in paragraph four of the Policy section. II. Background. Alternative Dispute Resolution (ADR) refers to a range of procedures

47

ACQUISITION LETTER  

Broader source: Energy.gov (indexed) [DOE]

No. 2009-04 No. 2009-04 Acquisition Regulation Date 02/12/09 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the DOE and NNSA Procurement Executives. Subject: Management of Excess Weapons Inventories and Selective Sensitive Equipment. References: 41 Code of Federal Regulations (CFR) 109-1, Department of Energy (DOE) Federal Property Management Regulations 48 CFR 52.245-1, Government Property DOE Guide 580.1-1, DOE Personal Property Management Guide DOE Order 580.1-1, DOE Personal Property Management, Contractor Requirements Document (CRD), Attachment 2, as set forth in the DOE O 580.1 Department of Energy Acquisition Regulation 970.5245-1, Property Federal Acquisition Regulation Part 45, Government Property

48

Enforcement Letter  

Broader source: Energy.gov (indexed) [DOE]

10, 2003 10, 2003 Mr. John Christian [ ] BNFL, Inc. East Tennessee Technology Park Portal No. 8, Building K-761 P.O. Box 5689 Oak Ridge, TN 37831 Subject: Enforcement Letter- Noncompliance Tracking System Reports and May 14-15, 2003, Price-Anderson Amendments Act Program Review Dear Mr. Christian: This letter refers to the Department of Energy's (DOE) review of the facts and circumstances related to several Price-Anderson noncompliances, which are documented in the following Noncompliance Tracking System (NTS) reports * NTS-ORO--BNFL-K33-2003-0001, "Weaknesses in BNFL's Issue Screening Process to Determine PAAA Noncompliance." This report documents that the BNFL PAAA Review Board failed to correctly identify and report the vast majority of

49

EPA Regulation Compliance | Department of Energy  

Office of Environmental Management (EM)

below: Mercury and Air Toxics Standards for Electric Generation Units - MATS Cross State Air Pollution Rule - CSAPR Carbon Pollution Standards for New Power Plants - 111(b) Carbon...

50

Enforcement Letter  

Broader source: Energy.gov (indexed) [DOE]

9, 2002 9, 2002 Mr. Alan Parker [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Building [ ] Uptake Event of October 5, 2001 Dear Mr. Parker: This letter refers to the Department of Energy's evaluation of facts and circumstances concerning the October 2001 unplanned uptakes of radioactive material by two Radiological Control Technicians (RCT) in Building [ ]. These issues were reported into the Noncompliance Tracking System (NTS) by your staff (NTS-RFO--KHLL-[ ] 2002-0001) on February 11, 2002. One RCT received a committed effective dose equivalent (CEDE) of 1.6 rem, and the remaining RCT received 240 millirem (mrem) CEDE. While these exposures do not

51

Letter: Meyerhofer  

SciTech Connect (OSTI)

This letter confirms that the Laboratory for Laser Energetics (LLE) was an important part of the FY10 NIF Polar Drive Exploding Pusher experiments on the National Ignition Facility (NIF). These experiments were designed by LLE to produce requested neutron yields to calibrate and qualify nuclear diagnostics. LLE built a deuterium-tritium filling system for the glass shells and provided them to LLNL for mounting. In FY10, four exploding pusher implosions were performed with measured neutron yields within a factor of two of requested and ion temperatures within 20% of requested. These implosions are proving to be an ideal platform for commissioning the nuclear diagnostic suite on the NIF and are achieving all of the objectives planned for this campaign.

Mackinnon, A J

2011-01-06T23:59:59.000Z

52

Letter from the Advisor  

E-Print Network [OSTI]

of History Undergraduate Historical Journal AdvisorLetter from the Advisor I am immensely impressed by the

Mostern, Ruth

2014-01-01T23:59:59.000Z

53

Letter to the Editor  

E-Print Network [OSTI]

Letter to the editor regarding David Bosse's article, "Institutional Map and Atlas Collecting in Eighteenth-Century America," (Coordinates, Series B; 9)....

Kovarsky, Joel

2008-04-17T23:59:59.000Z

54

Letter to the Editor  

E-Print Network [OSTI]

Letter to the editor regarding Jorge A. Gonzalez article "Problems That Arise When Providing Geographic Coordinate Information for Cataloged Maps (Coordinates Series B, No. 8)....

Andrew, Paige

2008-05-07T23:59:59.000Z

55

Topics for letter "n" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Development Lab Quiet Wing Radiochemistry Annex Virtual Tour Topics for letter "n" nano Nano Letters nano-scale particles nano-SIMS NanoDesi nanodevices nanoparticle...

56

59Job Search Letters CHAPTER 4 JOB SEARCH LETTERS  

E-Print Network [OSTI]

59Job Search Letters CHAPTER 4 JOB SEARCH LETTERS COVER LETTERS ARE AS IMPORTANT TO A TARGETED JOB you are seeking can make you look unfocused. If you are unwilling to take the time and energy resume and to invite you for an interview. Cover letters focus on either obtaining information as to job

Moore, Paul A.

57

Unnumbered in cover letter  

Office of Legacy Management (LM)

A John McCray, Colorado Oil and Gas Conservation Commission Unnumbered in cover letter The DOE report demonstrates a high level of technical competence; the modeling work and...

58

TransmittalLetter.pdf | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

TransmittalLetter.pdf TransmittalLetter.pdf TransmittalLetter.pdf More Documents & Publications USRussianLetter.pdf Fact Sheet: United States-Japan Joint Nuclear Energy Action Plan...

59

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 5, 2004 May 5, 2004 Enforcement Letter, Battelle Memorial Institute - May 5, 2004 Enforcement Letter issued to Battelle Memorial Institute related to Radiological Work Practices at the Pacific Northwest National Laboratory April 19, 2004 Enforcement Letter, Westinghouse Savannah River Company - April 19, 2004 Enforcement Letter issued to Westinghouse Savannah River Company related to Employee Reprisal at the Savannah River Site April 1, 2004 Enforcement Letter, Bechtel Nevada - April 1, 2002 Enforcement Letter issued to Bechtel Nevada related to Noncompliances with Occupational Radiation Protection and Quality Assurance Requirements at the Nevada Test Site March 25, 2004 Enforcement Letter, Bechtel National Inc - March 25, 2004 Enforcement Letter issued to Bechtel National, Inc., related to Concrete

60

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Enforcement » Enforcement Letters Services » Enforcement » Enforcement Letters Enforcement Letters Documents Available for Download November 27, 2013 Enforcement Letter, WEL-2013-04 Issued to National Renewable Energy Laboratory related to a drum rupture and flash event of the Thermochemical User Facility. July 30, 2013 Enforcement Letter, WEL-2013-02 Issued to Wastren Advantage, Inc. related to the Loss of Supplied Breathing Air in the Box Breakdown Area of the Transuranic Waste Processing Center located in Oak Ridge, Tennessee July 22, 2013 Enforcement Letter, NEL-2013-03 Issued to Lawrence Livermore National Security, LLC related to Programmatic Deficiencies in the Software Quality Assurance Program at the Lawrence Livermore National Laboratory May 29, 2013 Enforcement Letter, WEL-2013-01

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Letters to the Editor  

Science Journals Connector (OSTI)

......Better return on investment makes sense, but...e-mail Beware political projects Dear Editor...might put itself at risk by being associated...card scheme - a political project (Letters...but ignoring the political issues is in effect...are to minimise risk and maximise operational......

Letters to the Editor

2002-11-01T23:59:59.000Z

62

Letters to the Editor  

Science Journals Connector (OSTI)

...Editor 10.1126/science.143.3607.637-b D. Rothman Rocketdyne, 6633 Canoga A venue, Canoga Park, California Letters to...exam-ine various formal and informal reme-dies. D. ROTHMAN Rocketdyne, 6633 Canoga A venue, Canoga Park, California Scientists...

D. Rothman

1964-02-14T23:59:59.000Z

63

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 20, 2010 January 20, 2010 Enforcement Letter, Isoteck Systems, LLC - January 20, 2010 Enforcement Letter issued to Isotek Systems, LLC related to Quality Assurance Issues associated with the U233 Material Downblending and Disposition Project at Oak Ridge National Laboratory September 14, 2009 Enforcement Letter, Battelle Energy Alliance, LLC - September 14, 2009 Enforcement Letter issued to Battelle Energy Alliance, LLC related to a Failed Scram Event at the Neutron Radiography Reactor at the Idaho National Laboratory July 13, 2009 Enforecement Letter, Parsons Infrastructure & Technology Group INC, - July 13, 2009 Enforcement Letter issued to Parsons Infrastructure & Technology Group, Inc., related to a Form Wood Timber Fire at the Salt Waste Processing Facility at the Savannah River Site

64

Enforcement Letter - Richland  

Broader source: Energy.gov (indexed) [DOE]

24, 2001 24, 2001 Ms. M.P. Delozier [ ] CH2M Hill Hanford Group, Inc. MSIN: H6-08 2440 Stevens Center Richland, WA 99352 Subject: Enforcement Letter Dear Ms. Delozier: This letter refers to a recent investigation by the Department of Energy (DOE), regarding potential noncompliances with the requirements of 10 CFR 830, "Nuclear Safety Management," occurring at the Hanford Tank Farms. The investigation reviewed three issues that were reported into the Noncompliance Tracking System (NTS) by CH2M Hill Hanford Group, Inc. Two of the NTS reports involve the failure to perform the Technical Safety Requirement (TSR) for [ ] gas monitoring. The initial potential noncompliance occurred in January 2000, in which a Zip Cord was installed in a catch tank without first monitoring for [ ]

65

Enforcement Letter - Chicago  

Broader source: Energy.gov (indexed) [DOE]

16, 2002 16, 2002 Dr. Peter Paul, [ ] Brookhaven Science Associates Brookhaven National Laboratory Building 460 P.O. Box 5000 Upton, NY 11973-5000 Subject: Enforcement Letter Dear Dr. Paul: This letter refers to an evaluation by the Department of Energy (DOE) of three reports of noncompliances with quality assurance and/or occupational radiation protection provisions of DOE's nuclear safety requirements occurring at Brookhaven National Laboratory (BNL). These issues, described below, were reported into the Noncompliance Tracking System (NTS) by your staff and involved procurement and/or control of radioactive sources. 1. On January 19, 2001, BNL reported that an [radioactive] neutron source in an unlabeled package had been moved from a posted High Radiation Area to radiologically controlled

66

Letters.PDF  

Broader source: Energy.gov (indexed) [DOE]

Kiran Patel Kiran Patel Department of Energy Washington , DC 20585 January 25, 20 10 AAAA World Import-Export, Inc. 7800 NW 29th Street Miami, FL 33122-1104 Dear Mr. Patel, The purpose of this letter is to notify you that the AAAA World Import-Export compact Ouorescent lamps (CFLs), models HS14BX3 and HS14CL3, will be di squalified from the ENERGY STAR Program, etfective today, January 25, 2010. The disqualification of these products is a result of the PEARL Cycle 9 testing indicating the products failed to meet ENERGY STAR criteria (as noted in the letter to your supplier, Xiamen Longstar, dated Novemher 2, 2009, from Richard Karney, ENERGY STAR Products Manager). When a product is disqualified from the ENERGY STAR program, all corresponding packaging and your supplier's product will be

67

Enforcement Letter - Rocky Flats  

Broader source: Energy.gov (indexed) [DOE]

1, 2000 1, 2000 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Enforcement Letter Dear Mr. Card: This letter refers to an evaluation by the Department of Energy (DOE) of noncompliance report number NTS-RFO--KHLL-SITEWIDE-2000-0005, which describes noncompliances with the design and procurement requirements of 10 CFR 830.120 (Quality Assurance Rule). 10 CFR 830.120(c)(2)(iii) requires that procured items and services shall meet established requirements and perform as required; 10 CFR 830.120(c)(2)(ii) requires that design work including changes, shall incorporate applicable requirements and design bases; 10 CFR 830.120(c)(2)(iv) requires that inspection and testing of specified items, services, and processes shall be conducted

68

Enforcement Letter - KHLL  

Broader source: Energy.gov (indexed) [DOE]

Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site P.O. Box 464 Golden, CO 80402-0464 Subject: Enforcement Letter Noncompliance Report: NTS-RFO--KHLL-771OPS-1997-0002 Dear Mr. Card: This letter refers to the Department of Energy=s (DOE) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The potential noncompliances involved inadequate implementation of work controls, specifically failure of workers to perform required surveillance of the Fire Protection System. The failure to fully perform the required surveillance was identified by Safe Sites of Colorado (SSOC) on June 2, 1997, and reported to DOE in the subject Noncompliance Tracking System report on June 26, 1997.

69

Enforcement Letter - WSRC  

Broader source: Energy.gov (indexed) [DOE]

4, 2003 4, 2003 Robert A. Pedde, [ ] Westinghouse Savannah River Company Savannah River Site Building 703-A/Room A203 Aiken, SC 29808 Subject: Enforcement Letter for Criticality Safety Violations (NTS-SR-WSRC- HCAN-2002-0001) Dear Mr. Pedde: This letter addresses Criticality Safety Violations that have occurred at the H-Canyon facility during a 15-month period from February 2002 through June 2003. The DOE Office of Price-Anderson Enforcement (OE) has reviewed these violations and is dismayed that they are both programmatic and recurring in nature. Indeed, in one case a criticality safety defense noncompliant condition existed since November 1996. Our review of these events identified multiple work process deficiencies that contributed to

70

Enforcement Letter - Idaho  

Broader source: Energy.gov (indexed) [DOE]

Dr. Bernard L. Meyers Dr. Bernard L. Meyers [ ] Bechtel BWXT Idaho, LLC P.O. Box 1625, MS 3898 Idaho Falls, Idaho 83415 Subject: Enforcement Letter (NTS-ID--BBWI-TRA-1999-0001) Dear Dr. Meyers: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning issues related to the contamination of personnel while performing a hot cell exhaust system filter replacement. This incident occurred on July 21, 1999, at the Idaho National Engineering and Environmental Laboratory's (INEEL) Test Reactor Area Hot Cell Facility (TRA-632). Building TRA-632 is used by International Isotopes Idaho, Inc. (I4) for the preparation of irradiated materials for commercial distribution. During February 29 through March 2, 2000, DOE conducted an investigation to determine what, if any, noncompliances with applicable nuclear

71

Enforcement Letter - ELBN022603  

Broader source: Energy.gov (indexed) [DOE]

26, 2003 26, 2003 Mr. Frederick A. Tarantino [ ] Bechtel Nevada 2621 Losee Road North Las Vegas, NV 89030-4129 Subject: Enforcement Letter - Bechtel Nevada Authorization Basis Noncompliances Dear Mr. Tarantino: This letter refers to the Department of Energy's (DOE's) review of the facts and circumstances related to certain nuclear safety noncompliances during 2002 at the Nevada Test Site. These noncompliances were identified in the process of conducting a limited Price-Anderson Amendments Act (PAAA) Program Review of Bechtel Nevada during November 14-15, 2002, by DOE's Office of Price-Anderson Enforcement (OE), in coordination with DOE's National Nuclear Security Administration Nevada Site Office (NNSA/NSO). These matters are being called to your attention through this

72

Enforcement Letter - Argonne West  

Broader source: Energy.gov (indexed) [DOE]

9, 1999 9, 1999 Mr. John I. Sackett [ ] Argonne National Laboratory-West P.O. Box 2528 Idaho Falls, Idaho 83403-6000 Subject: Enforcement Letter (NTS-CH-AA-ANLW-ANLW-1998-0001) Dear Mr. Sackett: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning two incidents occurring in June and August 1998 at Argonne National Laboratory - West's (ANLW) Fuel Conditioning Facility (FCF): dropping a fuel basket assembly containing chopped fuel elements and repair of a manipulator seal tube. During November 2-3, 1998, DOE conducted an investigation to determine what, if any, noncompliances with applicable nuclear safety regulations may have been associated with these incidents. A copy of the investigation summary report is

73

Enforcement Letter - Chicago  

Broader source: Energy.gov (indexed) [DOE]

Shirley Strum-Kenny Shirley Strum-Kenny [ ] Stony Brook University Hospital Administration Building, Room 310 Stony Brook, NY 11794-0701 Subject: Enforcement Letter (NTS-CH-BH-BNL-BNL-1998-0004) EA-1999-02 Dear Dr. Strum-Kenny: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning an event at the Radiation Therapy Facility (RTF) occurring in March 1998. In November 1998, DOE conducted an investigation to determine whether violations of DOE's nuclear safety rules associated with the event had occurred. The resulting Investigation Summary Report was transmitted to you on February 19, 1999. On March 11, 1999, you participated in an Enforcement Conference, along with Brookhaven Science Associates (BSA) management, to discuss the occurrence, its

74

Enforcement Letter - Idaho  

Broader source: Energy.gov (indexed) [DOE]

0, 1999 0, 1999 Mr. Steve Laflin [ ] International Isotopes Idaho Inc. 2325 West Broadway, Suite D Idaho Falls, ID 83402 Subject: Enforcement Letter (NTS-ID--LITC-TRA-1999-0001) Dear Mr. Laflin: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the relocation of an irradiated [isotope] pellet from within a hot cell to an adjoining, outside, charging port service area. This incident occurred on January 6, 1999, at the Idaho National Engineering and Environmental Laboratory's Test Reactor Area Hot Cell Facility (TRA-632). Building TRA-632 is utilized by International Isotopes Idaho Inc. (I4) for the preparation of irradiated materials for distribution. During March 23-24, 1999, DOE conducted an investigation to determine

75

CA IOUs Comment Letter  

Broader source: Energy.gov (indexed) [DOE]

June 19, 2012 June 19, 2012 Mr. Daniel Cohen U.S. Department of Energy Office of the General Council 1000 Independence Avenue, SW., Room 6A245 Washington, DC 20585-0121 Dear Mr. Cohen: This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent some of the largest utility companies in the Western United States, serving over 35 million customers.

76

Enforcement Letter - Idaho  

Broader source: Energy.gov (indexed) [DOE]

2000 2000 Dr. Bernard L. Meyers [ ] Bechtel BWXT Idaho, LLC P.O. Box 1625, MS 3898 Idaho Falls, ID 83414 Subject: Enforcement Letter Dear Dr. Meyers: This letter refers to a recent investigation by the Department of Energy (DOE) regarding noncompliances with requirements of 10 CFR 830.120 (Quality Assurance Rule) occurring at the Idaho National Engineering and Environmental Laboratory (INEEL). The investigation reviewed five issues reported into the Noncompliance Tracking System (NTS) by Bechtel BWXT Idaho, LLC (BBWI) and two Quality Program assessment reports. Two of the NTS reports involved specific events that occurred before October 1, 1999, when BBWI began operating INEEL but was responsible for implementing corrective actions. The remaining three reports involved programmatic

77

NNSA POLICY LETTER  

National Nuclear Security Administration (NNSA)

POLICY LETTER POLICY LETTER Approved: 6-20-13 WEAPON QUALITY POLICY NATIONAL NUCLEAR SECURITY ADMINISTRATION Office of Defense Programs NAP-24 AVAILABLE ONLINE AT: INITIATED BY: http://hq.na.gov Weapon Quality Division THIS PAGE INTENTIONALLY LEFT BLANK NAP-24 1 6-20-13 WEAPON QUALITY POLICY 1. PURPOSE. The purpose of this document, NNSA Weapon Quality Policy (NAP-24), is to identify the quality requirements applicable to weapon activities of the NNSA, NNSA contractors and subcontractors. The requirements contained herein are in addition to the scope of quality requirements found in DOE Order 414.1D, Quality Assurance. NAP-24 establishes specific weapon and weapon-related product focused quality requirements for designing, producing and

78

NNSA POLICY LETTER  

National Nuclear Security Administration (NNSA)

POLICY LETTER POLICY LETTER Approved: 12-11-13 QUALITY MANAGEMENT SYSTEM NATIONAL NUCLEAR SECURITY ADMINISTRATION Office of the Administrator NAP-26 CONTROLLED COPIES AVAILABLE AT: INITIATED BY: http://www.nnsa.energy.gov Office of Quality Management THIS PAGE INTENTIONALLY LEFT BLANK NAP-26 1 12-11-13 QUALITY MANAGEMENT SYSTEM 1. PURPOSE. Establish, implement, maintain, assess, and improve the Quality Management System (QMS) for NNSA Federal operations in compliance with the International Organization for Standardization (ISO) Standard Requirements document (ISO 9001:2008), Quality Management Systems, and in accordance with DOE Order 414.1, Quality Assurance. 2. CANCELLATION. None. 3. APPLICABILITY. a. The provisions of this NNSA Policy document apply to all the NNSA's Federal

79

RFP Invitation Letter  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Invitation Letter (Rev. 5, 11/22/10) Invitation Letter (Rev. 5, 11/22/10) Page 1 of 3 An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA Acquisition Services Management (ASM) Division Subcontracts, ASM-SUB P.O. Box 1663, Mail Stop D447 Los Alamos, New Mexico 87545 505-665-3814 E-mail: dknox@lanl.gov Date: August 7, 2013 Subject: Trinity and NERSC-8 Computing Platforms / Request for Proposal (RFP) No. 241314 Greetings: Los Alamos National Security, LLC (LANS) invites you to submit a Fixed Price proposal for the Trinity and NERSC-8 Computing Platforms. The procurement of these two (2) platforms is in support of the following: a. The New Mexico Alliance for Computing at Extreme Scales (ACES), residing within:  Los Alamos National Laboratory (LANL) and

80

Enforcement Letter - ELBNI032504  

Broader source: Energy.gov (indexed) [DOE]

25, 2004 25, 2004 Mr. J. P. Henschel [ ] Bechtel National Inc. 3000 George Washington Way Richland, WA 99352 Subject: Enforcement Letter for Concrete Work Issues Dear Mr. Henschel: This letter addresses eleven instances that have occurred at the Waste Treatment Plant during a 14-month period form August 2002 through October 2003 in which concrete work was not performed to established procedures and standards. The Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) has reviewed these concrete work issues and is concerned with the work process you have in place to inspect concrete work prior to pour. In addition, OE is concerned with your failure to correct these known problems in a timely manner. It is our expectation that Bechtel

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

EM SSAB Recommendations & Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Recommendations & Letters Recommendations & Letters EM SSAB Recommendations & Letters February 27, 2013 EM SSAB Recommendations and Letters - 2013-03 Included recommendations, letters, and other related materials. February 27, 2013 EM SSAB Recommendations and Letters - 2013-02 Included recommendations, letters, and other related materials. February 27, 2013 EM SSAB Recommendations and Letters - 2013-01 Included recommendations, letters, and other related materials. July 26, 2012 EM SSAB Recommendations and Letters - 2012-01 Included recommendations, letters, and other related materials. September 19, 2011 EM SSAB Recommendations and Letters - 2011-03 Included recommendations, letters, and other related materials. September 19, 2011 EM SSAB Recommendations and Letters - 2011-02

82

CX-010774: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Iona Relay Station Maintenance CX(s) Applied: B1.3, B1.11, B2.5 Date: 07/25/2013 Location(s): Idaho Offices(s): Nuclear Energy

83

file://L:\\DOE-hanford.gov\\public\\boards\\hab\\advice\\advice60.htm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Biology Laboratory, the 111-B Decontamination Station, the 115-B Gas Line PressureVacuum Seal House, the 118-C-4 (105-C) Horizontal Control Rod Cave and the 119-B Exhaust Air...

84

The generation fleet in MISO is being affected by time, fuel...  

Broader source: Energy.gov (indexed) [DOE]

Power Plan 111(b) & (d) Nature of Regulation Mercury and Air Toxics Standards Cross State Air Pollution Rule and Cooling Water Regulations (316(b)) New air quality standards Coal...

85

Topics for letter "Q" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Virtual Tour Topics for letter "Q" QAMS quadrupolar nuclei quadrupole quadrupole mass filter qualifications quantification Quardrupole Quasi-optical bridge Quiet Wing Quiet Wing...

86

Topics for letter "l" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

"l" laser ablation LCM leadership leaf-cutter ants LEAP Letters of Intent light source lignin lignocellulose Linear Ion Trap Linux cluster liquid chromatography (LC) liquid samples...

87

Topics for letter "R" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Development Lab Quiet Wing Radiochemistry Annex Virtual Tour Topics for letter "R" R&D 100 award radiochemistry Radiochemistry Annex Radiochemistry Annex radiologial...

88

engineering LETTER FROM THE DEAN  

E-Print Network [OSTI]

.................................................................... ENGINEERING MECHANICS.................................................... INDUSTRIAL ENGINEERING ENGINEERING EARTH & ENVIRONMENTAL ENGINEERING ELECTRICAL ENGINEERING INDUSTRIAL ENGINEERING & OPERATIONSexploring columbia engineering majors #12;LETTER FROM THE DEAN Making a decision about your

Hone, James

89

Topics for letter "u" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lab Quiet Wing Radiochemistry Annex Virtual Tour Topics for letter "u" uantitative UEC UHV VT SPM ultra-high resolution ultra-high vacuum Ultrafast ultrahigh vacuum ultraviolet...

90

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

- December 23, 2010 Issued to National Security Technologies, LLC related to a flash fire event at the Nevada National Security Site May 20, 2010 Enforcement Letter, Battelle...

91

Topics for letter "W" | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lab Quiet Wing Radiochemistry Annex Virtual Tour Topics for letter "W" W-band pulsed EPR spectrometer Washington State Academy of Sciences Washington State University waste...

92

Enforcement Letter, Westinghouse Savannah River Company - April...  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Company - July 21, 1998 Enforcement Letter, Westinghouse Savannah River Company - March 29, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000...

93

Manhattan Project: Einstein's Letter, 1939  

Office of Scientific and Technical Information (OSTI)

Einstein's letter to Roosevelt, August 2, 1939 EINSTEIN'S LETTER Einstein's letter to Roosevelt, August 2, 1939 EINSTEIN'S LETTER (1939) Events > Early Government Support, 1939-1942 Einstein's Letter, 1939 Early Uranium Research, 1939-1941 Piles and Plutonium, 1939-1941 Reorganization and Acceleration, 1940-1941 The MAUD Report, 1941 A Tentative Decision to Build the Bomb, 1941-1942 On October 11, 1939, Alexander Sachs, Wall Street economist and longtime friend and unofficial advisor to President Franklin Delano Roosevelt, met with the President to discuss a letter written by Albert Einstein the previous August (right). Einstein had written to inform Roosevelt that recent research on fission chain reactions utilizing uranium made it probable that large amounts of power could be produced by a chain reaction and that, by harnessing this power, the construction of "extremely powerful bombs" was conceivable. Einstein believed the German government was actively supporting research in this area and urged the United States government to do likewise. Sachs read from a cover letter he had prepared and briefed Roosevelt on the main points contained in Einstein's letter. Initially the President was noncommittal and expressed concern over locating the necessary funds, but at a second meeting over breakfast the next morning Roosevelt became convinced of the value of exploring atomic energy.

94

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 30, 1999 July 30, 1999 Enforcement Letter, Lockheed-Martin Energy Systems, Inc - July 30, 1999 Issued to Lockheed Martin Energy Systems, Inc. related to Radioactive Material Uptakes at the Y-12 National Security Complex April 15, 1999 Enforcement Letter, Stony Brook University Hospital - April 15, 1999 Issued to Stony Brook University Hospital related to a Failed Interlock at the Radiation Therapy Facility at the Brookhaven National Laboratory February 9, 1999 Enforcement Letter, Argonne National Laboratory-West - February 9, 1999 Enforcement Letter issued to Argonne National Laboratory related to a Dropped Fuel Basket Assembly and Radiation Protection Program Deficiencies at Argonne National Laboratory-West August 4, 1998 Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4,

95

Enforcement Letter ELPNL050404  

Broader source: Energy.gov (indexed) [DOE]

5, 2004 5, 2004 Dr. Leonard K. Peters, [ ] Batelle Memorial Institute Pacific Northwest Division P.O. Box 999 902 Battelle Blvd. Richland, WA 99352 Subject: Pacific Northwest National Laboratory Enforcement Letter Dear Dr. Peters: The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-RL-- PNNL-PNNLNUCL-2003-0004. Our evaluation included review of the causal analysis, corrective actions, additional supporting information, and discussion with Department of Energy Richland Operations Office (RL) personnel. The subject NTS report described multiple deficiencies identified through a DOE-RL assessment of contamination control and survey practices associated with

96

Nuclear Safety Enforcement Letter issued to Sandia Corporation...  

Energy Savers [EERE]

Nuclear Safety Enforcement Letter issued to Sandia Corporation Nuclear Safety Enforcement Letter issued to Sandia Corporation 9222014 Enforcement Letter, Sandia Corporation,...

97

FINAL CA IOU Comment Letter RFI Regulatory Burden | Department...  

Broader source: Energy.gov (indexed) [DOE]

FINAL CA IOU Comment Letter RFI Regulatory Burden FINAL CA IOU Comment Letter RFI Regulatory Burden This letter comprises the comments of the Pacific Gas and Electric Company...

98

Enforcement Letter, WEL-2012-04 - November 5, 2012 | Department...  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Letter, Controlled Power Company - WEL-2012-02 Enforcement Letter, Safety and Ecology Corporation - NEL-2011-04 Enforcement Letter, WEL-2012-05 - December 20,...

99

Enforcement Letter - KHLLC081204  

Broader source: Energy.gov (indexed) [DOE]

4 4 Ms. Nancy Tuor, [ ] Kaiser-Hill Company, LLC 10808 Highway 93 Unit B Golden, CO 80403-9200 Subject: Enforcement Letter for Water Treatment System Breach and Foam Fire Dear Ms. Tuor: The Office of Price-Anderson Enforcement (OE) has reviewed the details and circumstances regarding two recent site events: the Building 771 unauthorized breach of the Water Treatment System in December 2003; and the February 2004 Building 991 foam fire. Both of these events represent significant breakdowns in your safety programs. Additionally, the general failure to adequately recognize hazards and implement effective controls observed in association with the Building 991 foam fire was an underlying deficiency in the 2003 Building 371 glovebox fire, for which this office has

100

Enforcement Letter - ELMOUND1222041  

Broader source: Energy.gov (indexed) [DOE]

4 4 Mr. John G. Lehew, [ ] CH2M Hill Mound, Inc 1 Mound Road P.O. Box 3030 Miamisburg, OH 45343-3030 Subject: Enforcement Letter-Spread of Contamination during Group 9 Waste Line Remediation Dear Mr. Lehew: My office has completed an evaluation of the facts and circumstances relating to the contamination event reported in the above subject. On Tuesday, July 27, 2004, several employees working in the soil contamina tion area (SCA) were unnecessarily contaminated with radioactive material as they traversed the SCA. The employees were assisting in the removal of a concrete encased underground radioactive material waste line. Documentation for the removal of prior sections of the waste line in potential release

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Oregon Fire Marshall Letter  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

and E85 fuel ethanol fuel specification, dispensers, and E85 fuel ethanol fuel specification, dispensers, and dispenser labeling requirements This is a summary of Oregon's biofuel (biodiesel, biodiesel blends, and E85 fuel ethanol) regulations and dispenser labeling requirements. Please refer to OAR 603-027-0410 thru OAR 603-027-0490 for the complete regulation. In addition, we try to answer some common questions about dispensers permitted for use with biofuels. Due to the unique characteristics of these fuels, certain precautions must be taken. Some dispensers commonly used for gasoline and petroleum diesel are not to be used for biodiesel and E85. Biodiesel Identification of product. Biodiesel and biodiesel blends shall be identified by the capitol letter "B" followed by the numerical value representing the volume percentage of biodiesel fuel. For

102

Enforcement Letter ELWSRC041904  

Broader source: Energy.gov (indexed) [DOE]

19, 2004 19, 2004 Mr. Robert A. Pedde, [ ] Westinghouse Savannah River Company Savannah River Site Building [ ]/Room [ ] Aiken, SC 29808 Subject: Enforcement Letter Addressing Employee Reprisal (NTS-SR-WSRC-CLOSEGEN-2003-0001) Dear Mr. Pedde: On October 13, 2003, Westinghouse Savannah River Company (WSRC) reported a noncompliance into the Noncompliance Tracking System (NTS) involving an employee reprisal. The employee was terminated from WSRC after raising safety-related issues and procedural violations while positions in his area of expertise were available elsewhere at the site. The matter was investigated as an employee concern and the employee was reinstated. Our review of the Investigation Report dated October 1, 2003, indicates that the matter

103

Enforcement Letter - Richland  

Broader source: Energy.gov (indexed) [DOE]

7, 1997 7, 1997 Mr. H. J. Hatch [ ] Fluor Daniel Hanford, Inc., H5-20 P.O. Box 1000 Richland, WA 99352-1000 Subject: Noncompliance Numbers NTS-RL--PHMC-TANKFARM-1997-0001 NTS-RL--PHMC-TANKFARM-1997-0002 NTS-RL--PHMC-TANKFARM-1997-0003 Dear Mr. Hatch: This letter refers to the Department of Energy's (DOE) investigation of potential violations of the Quality Assurance Rule (QA Rule) nuclear safety requirements identified in the subject reports. Fluor Daniel Hanford, Incorporated, as Management and Integrating contractor for the DOE's Hanford site, has responsibility for assuring sub-tier contractors comply with its Quality Assurance Plan. On April 27 and 28, 1997, the Office of Enforcement and Investigation personnel met with members of your staff and representatives from Lockheed Martin Hanford Company (LMHC). Our purpose

104

Physical Review Letters.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HIGHLIGHT of our most recent work to be published shortly in HIGHLIGHT of our most recent work to be published shortly in Physical Review Letters. We prepared a range of well characterized samples by the sol-gel method developed in our laboratory. By careful doping we controlled the divalent doping (in one set of samples) and the oxygen content (in the second set). We measured the temperature dependent magnetotransport behaviour of these complex oxides. The electronic structure of these well characterized samples was measured by electron energy-loss spectroscopy using the newly installed CM200/FEG microscopes. No discernible change in the Mn L3,2 edges were observed either as a function of doping or oxygen content. However, the O-K edge(1s->2p transitions) intensity, sensitive to the 2p hole density on oxygen sites, varied systematically

105

Acquisition Letters | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Acquisition Letters Acquisition Letters Acquisition Letters The following is a list of active Department of Energy Acquisition Letters. These files are in PDF (Portable Document Files), MS Excel, or htm (hypertext markup) format. To read PDF files you must have Adobe Acrobat Reader which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. NOTE: Copies of rescinded or cancelled AL's are available by calling the Office of Procurement and Assistance Policy at (202) 287-1330. ASSISTANCE ON USING THESE FILES: You may: (1) download these files to your local machine by clicking on the file name and choosing SAVE TO DISK, OR (2) you can configure Adobe Acrobat Reader to automatically open, which

106

Roberson Letter - August 15, 2003  

Office of Environmental Management (EM)

5, 2003 Mr. Wade Waters, Chair Savannah River Citizens' Advisory Board Dear Mr. Waters: In response to your letter of July 29, 2003i regarding implementation of the guidance for...

107

Enforcement Letters | Department of Energy  

Energy Savers [EERE]

Letter, NEL-2013-01 - January 7, 2013 Issued to B&W Pantex, LLC related to the Conduct of Nuclear Explosive Operations at the Pantex Plant December 20, 2012 Enforcement...

108

Enforcement Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 8, 2005 Enforcement Letter, CH2M Hill Hanford Group, Inc - July 8, 2005 Issued to CH2M Hill Hanford Group, Inc., related to Neutron Exposure at the Hanford Site June 2, 2005...

109

AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...  

Broader source: Energy.gov (indexed) [DOE]

AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL)...

110

Letters of Outreach to Partner Communities  

Broader source: Energy.gov [DOE]

Letters of Outreach to Partner Communities, from the Tool Kit Framework: Small Town University Energy Program (STEP).

111

Microsoft Word - 2008 Letter Report  

Broader source: Energy.gov (indexed) [DOE]

Prepared for Prepared for Office of Civilian Radioactive Waste Management U.S. Department of Energy 1000 Independence Avenue, SW Washington, D.C. 20585 Prepared by 490 L'Enfant Plaza North SW Washington, DC 20024 January 13, 2009 CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT This Page Intentionally Left Blank Civilian Radioactive Waste Management Fee Adequacy Assessment Letter Report i Executive Summary This Fiscal Year 2008 Civilian Radioactive Waste Management Fee Adequacy Letter Report presents an evaluation of the adequacy of the one mill per kilowatt-hour fee paid by commercial nuclear power generators for the permanent disposal of their spent nuclear fuel by the Government. This evaluation recommends no fee change.

112

AHAM Letter Acknowledging DOE Letter on Verification Program  

Broader source: Energy.gov [DOE]

This document is a response to the letter dated April 26, 2013, in which DOE adopted a new policy regarding DOE ENERGY STAR verification testing of models that are part of the AHAM verification program for clothes washers, dishwashers, and residential refrigerator/freezers.

113

Add astronomy to your letters  

Science Journals Connector (OSTI)

...August 2002 news News Add astronomy to your letters Now you can post...2002 Vol 43 NEWS Common cause for astronomy and geophysics With this issue of...the UK. This is the companion to Astronomy in the UK, published in 2000; together......

Sue Bowler

2002-08-01T23:59:59.000Z

114

Resource Letter N-1: Nanotechnology  

Science Journals Connector (OSTI)

This Resource Letter provides a guide to the literature on Nanotechnology. Journal articles books websites and other documents are cited on the following topics: attributes of various types of nanomaterials nanotechnology in the context of different academic fields and the effects of nanotechnology on society.

Devin Cela; Mildred Dresselhaus; Tingying Helen Zeng; Odair P. Ferreira

2014-01-01T23:59:59.000Z

115

Paducah DUF6 Conversion Final EIS - Appendix G: Consultation Letters  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Paducah DUF Paducah DUF 6 Conversion Final EIS APPENDIX G: CONSULTATION LETTERS Consultation Letters G-2 Paducah DUF 6 Conversion Final EIS Consultation Letters G-3 Paducah DUF 6 Conversion Final EIS U.S. DEPARTMENT OF ENERGY LETTERS TO STATE AGENCIES AND RECOGNIZED NATIVE AMERICAN GROUPS Consultation Letters G-4 Paducah DUF 6 Conversion Final EIS Consultation Letters G-5 Paducah DUF 6 Conversion Final EIS Consultation Letters G-6 Paducah DUF 6 Conversion Final EIS Consultation Letters G-7 Paducah DUF 6 Conversion Final EIS Consultation Letters G-8 Paducah DUF 6 Conversion Final EIS Consultation Letters G-9 Paducah DUF 6 Conversion Final EIS Consultation Letters G-10 Paducah DUF 6 Conversion Final EIS Consultation Letters G-11 Paducah DUF 6 Conversion Final EIS Consultation Letters G-12 Paducah DUF 6 Conversion Final EIS

116

AHAM Letter Acknowledging DOE Letter on Verification Program  

Broader source: Energy.gov (indexed) [DOE]

26, 2013 26, 2013 By E-Mail Ms. Kathleen B. Hogan Deputy Assistant Secretary for Energy Efficiency Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-0121 Dear Ms. Hogan: I am writing regarding your letter dated April 26, 2013, in which the U.S. Department of Energy (DOE or the Department) adopted a new policy regarding DOE ENERGY STAR verification

117

Manhattan Project: Einstein's Letter to Roosevelt  

Office of Scientific and Technical Information (OSTI)

EINSTEIN'S LETTER TO ROOSEVELT Albert Einstein (with Leo Szilard) to President Franklin Roosevelt, August 2, 1939 Resources > Library Below are photographs of both pages of the letter written by Albert Einstein, with the help of Leo Szilard, to President Franklin Roosevelt on August 2, 1939, warning Roosevelt of the dangers posed by nuclear energy. Click here for more background on the writing of this letter. The photographs of the pages themselves are courtesy the Franklin D. Roosevelt Presidential Library and Museum. First page of Einstein's letter to Roosevelt, August 2, 1939. Second page of Einstein's letter to Roosevelt, August 2, 1939. Click on a link below to return to Einstein's Letter, 1939 Albert Einstein Library Sources and notes for this page.

118

FINAL_2013_Stakeholder-Letter  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Send a letter to local officials/stakeholders about your participation in EPA's 2013 ENERGY STAR National Send a letter to local officials/stakeholders about your participation in EPA's 2013 ENERGY STAR National Building Competition by customizing the text below with your organization's information and whether you're also participating in the communications category of the competition. Dear [Name of official], [Name of buildings/space], owned/managed by [organization], has been selected to participate in the U.S. Environmental Protection Agency's (EPA's) 2013 ENERGY STAR National Building Competition: Battle of the Buildings to help improve the energy efficiency of commercial buildings and protect the environment. In the spirit of popular weight-loss competitions, [name of buildings/space] will battle it out against thousands of other teams representing buildings and

119

DMP ENFORCEMENT LETTER ELDMP102804  

Broader source: Energy.gov (indexed) [DOE]

28, 2004 28, 2004 Mr. C. Delbert Marcum [ ] Diversified Metal Products, Inc. 3710 N. Yellowstone Highway P.O. Box 1404 Idaho Fall, Idaho 83403 Subject: Enforcement Letter for Transportainer Fabrication Deficiencies Dear Mr. Marcum: This letter addresses deficiencies associated with the fabrication of four transportainers delivered under contract to Washington TRU Solutions LLC (WTS) in support of their Characterization and Repackaging Modular Unit development. The Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) has reviewed your performance in delivering these transportainers and is concerned with the quality assurance aspects of your work activities in fabricating the transportainers. Specifically, three areas of deficiency were noted and are provided below in more detail:

120

Roberson Letter - December 12, 2003  

Broader source: Energy.gov (indexed) [DOE]

12, 2003 12, 2003 Mr. Monte Wilson, Chair INEEL Citizens Advisory Board North Wind, Inc. 545 Shoup Avenue, Suite 200 Idaho Falls, Idaho 83402 Dear Mr. Wilson: In response to your letter of November 21, 2003, regarding direction and guidance for implementing direct DOE relationship and funding for Environmental Management (EM) Site Specific Advisory Boards (SSABs), I first want to assure you that the Department of Energy views the SSABs as crucial to accomplishing our cleanup mission. The SSABs represent a strong commitment by the Department to continue its relationship with communities surrounding the EM sites by considering community concerns and values in the Department's decision-making process. Your letter makes a persuasive case for using short-term option # 1: "Execute DOE Support Services Contract w/ a

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...  

Broader source: Energy.gov (indexed) [DOE]

AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL) that remain in effect are identified below. All other...

122

Guidelines for Cover Letters 1. Never mail a resume without a cover letter.  

E-Print Network [OSTI]

Guidelines for Cover Letters 1. Never mail a resume without a cover letter. 2. Address by name that captures the attention of the prospective employer so that the letter and resume are considered worth reading. 6. Highlight and draw attention to the points in your resume that uniquely qualify you

Petrick, Irene J.

123

Enforcement Letter, Westinghouse Hanford Corporation - July 6...  

Broader source: Energy.gov (indexed) [DOE]

July 6, 1995 Enforcement Letter, Westinghouse Hanford Corporation - July 6, 1995 July 6, 1995 Issued to Westinghouse Hanford Corporation related to Radiological Work Control...

124

Enforcement Letter, Westinghouse Hanford Corporation - September...  

Broader source: Energy.gov (indexed) [DOE]

September 22, 1995 Enforcement Letter, Westinghouse Hanford Corporation - September 22, 1995 September 22, 1995 Issued to Westinghouse Hanford Corporation related to Operational...

125

Enforcement Letter, Brookhaven Science Associates - January 16...  

Broader source: Energy.gov (indexed) [DOE]

Science Associates - January 16, 2002 Enforcement Letter, Brookhaven Science Associates - January 16, 2002 January 16, 2002 Issued to Brookhaven Science Associates related to...

126

Enforcement Letter Issued to LVI Services, Inc  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Tennessee 37922 WEL-2013-03 Dear Mr. Gilmore: This letter refers to the Office of Health, Safety and Security's Office of Enforcement and Oversight investigation into the...

127

Enforcement Letter, Parsons Technology Development & Fabrication...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 April 13, 2010 Issued to...

128

Enforcement Letter, Geiger Brothers Mechanical Contractors, INC...  

Broader source: Energy.gov (indexed) [DOE]

Geiger Brothers Mechanical Contractors, INC - March 26, 2010 Enforcement Letter, Geiger Brothers Mechanical Contractors, INC - March 26, 2010 March 26, 2010 Issued to Geiger...

129

Enforcement Letter, Battelle Energy Alliance, LLC - September...  

Broader source: Energy.gov (indexed) [DOE]

Energy Alliance, LLC - September 14, 2009 Enforcement Letter, Battelle Energy Alliance, LLC - September 14, 2009 September 14, 2009 Issued to Battelle Energy Alliance, LLC related...

130

Parallel Processing Letters World Scientific Publishing Company  

E-Print Network [OSTI]

Parallel Processing Letters © World Scientific Publishing Company THE OPERATIONS DASHBOARD essential operational services, it is imperative that grid administrators can troubleshoot the problems

Miller, Russ

131

Policy Flash 2013-30 Acquisition Letter on Acquisition Planning...  

Energy Savers [EERE]

Letter on Acquisition Planning Considerations for Management and Operating Contracts Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management...

132

Policy Flash 20 Acquisition Letter 2014-05/Financial Acquisition...  

Energy Savers [EERE]

Appropriations Committees Subject to Energy and Water Development and Related Agencies Policy Flash 20 Acquisition Letter 2014-05Financial Acquisition Letter 2014-02 Congressional...

133

Secretaries Bodman and Schafer's letter to Senator Bingaman ...  

Office of Environmental Management (EM)

and Schafer's letter to Senator Bingaman A letter to the Honorable Jeff Bingaman on biofuels policy, from the Secretary of Energy, Samuel W. Bodman, and Secretary of...

134

ACQUISITION LETTER DEAR Part 933 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

ACQUISITION LETTER DEAR Part 933 ACQUISITION LETTER DEAR Part 933 This AL establishes policy and provides guidance for the use of alternative dispute resolution techniques in...

135

Table of contents 1. Letter of Introduction...........................................................................................3  

E-Print Network [OSTI]

2. Mission statement, Logo.........................................................................................4 3. Letter of nomination...............................................................................................5 4. Letters of support..................................................................................................6-22 5. Headlands Park history and information...............................................23

Emmet County Michigan

2011-01-01T23:59:59.000Z

136

Enforcement Letter, Argonne National Laboratory-West - February...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- In the Matter of Bernard F. Cowan Enforcement Letter, Argonne National Laboratory-East - February 24, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000...

137

Resource Letter SE?1: Solar energy  

Science Journals Connector (OSTI)

Prepared at the request of the AAPT Editorial Board for Resource Letters. This is one of a series of Resource Letters on different topics intended to guide college physicists astronomers and other scientists to some of the literature and other teaching aids that may help improve course contents in specified fields. No Resource Letter is meant to be exhaustive and complete; in time there may be more than one letter on some of the main subjects of interest. Comments on these materials as well as suggestions for future topics will be welcomed. Please send such communications to Professor Aaron Owens Editor Resource Letter Board Department of Physics Lake Forest College Lake Forest IL 60045.

D. K. McDaniels; M. J. Throop

1976-01-01T23:59:59.000Z

138

Resource Letter SE?2: Solar Energy  

Science Journals Connector (OSTI)

This resource letter provides a source of information about the main types of solar energy and their uses updating Resource Letter SE?1 issued seven years ago. It is intended for the use of high school and college teachers both in developing courses and in guiding students to the literature of solar energy applications. Articles marked with an asterisk have been selected for publication in an accompanying reprint book. The letter E after the reference number denotes a relatively elementary item useful for high school and introductory college use and the educated public; the letter I denotes intermediate level references sophomore to senior level; and the letter A denotes advanced material principally for senior and graduate?level courses.

Laurent Hodges

1982-01-01T23:59:59.000Z

139

letter  

Broader source: Energy.gov (indexed) [DOE]

U.S. DEPARTMENT OF ENERGY U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL AUDIT OF THE U.S. DEPARTMENT OF ENERGY'S CONSOLIDATED FINANCIAL STATEMENTS FOR FISCAL YEAR 1998 Report Number: IG-FS-99-01 Capital Regional Audit Office Date of Issue: February 25, 1999 Germantown, MD 20874 AUDIT OF THE U.S. DEPARTMENT OF ENERGY'S CONSOLIDATED FINANCIAL STATEMENTS FOR FISCAL YEAR 1998 TABLE OF CONTENTS Page REPORT OF THE OFFICE OF INSPECTOR GENERAL...................................... 1 REPORT OF THE OFFICE OF INSPECTOR GENERAL ON THE DEPARTMENT'S INTERNAL CONTROLS...............................................5

140

LETTERS  

Science Journals Connector (OSTI)

The experimental results with the toroidal octupole constitute a significant advance in the problem of Controlled Thermonuclear Fusion. ...

1967-07-03T23:59:59.000Z

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

LETTERS:  

Science Journals Connector (OSTI)

......kennel or garden shed, but I won't get insurance if I attempted to do this myself for a...these functions leaves open an enhanced risk of undiscovered misunderstanding or oversight...happened? A little more geographical and political rigour would be much appreciated from......

Feedback

2012-01-01T23:59:59.000Z

142

LETTERS  

Science Journals Connector (OSTI)

I would prefer to see the U.S. investing in hydrogen fuel-cell technology while concurrently pushing fuel efficiency and hybrids. ... If more consumers purchase fuelefficient vehicles (and there are many to choose from), then car companies will make more of them, plain and simple. ...

2005-10-31T23:59:59.000Z

143

LETTERS:  

Science Journals Connector (OSTI)

......invent (such as securing the device), other people are often...checking the web, playing games, listening to music, taking photos...government provide them with these devices? Who decides which people...could be a low cost passive device, maybe the size of a credit......

Feedback

2012-01-01T23:59:59.000Z

144

Letter  

E-Print Network [OSTI]

The course will include online lectures (in video and powerpoint presentations) ... have a WebAssign account, follow the instructions for new users. Be sure to...

Anthony Rizzie

2011-06-09T23:59:59.000Z

145

Roberson Letter - September 25, 2003  

Broader source: Energy.gov (indexed) [DOE]

03 03 The Honorable J. Gresham Barrett U.S. House of Representatives Washington, D.C. 20515 Dear Congressman Barrett: Thank you for your August 8, 2003, letter regarding my guidance memorandum providing direction for restructuring and managing the procurement mechanisms that support the activities of the Environmental Management (EM) Site Specific Advisory Boards (SSABs). I share your concern that "inhibiting the ability of the community to engage in dialogue with the Department of Energy on issues affecting the cleanup efforts" would be undesirable, and I want to assure you that my SSAB guidance memorandum does not affect that important relationship. In no way does it change my policy or support regarding the value and importance of the EM SSABs.

146

Enforcement Letter - BWXT Y-12  

Broader source: Energy.gov (indexed) [DOE]

13, 2004 13, 2004 Mr. Dennis R. Ruddy [ ] BWXT Y-12 P.O. Box 2009 MS 8001 Oak Ridge, TN 37831-8001 Subject: Enforcement Letter Dear Mr. Ruddy: On June 7, 2004, the Department of Energy (DOE)/Na tional Nuclear Security Agency (NNSA) issued a Preliminary Notice of Violation (EA-2004-04), which included a quality improvement citation for continuing Safety Basis compliance issues at Y-12. BWXT Y-12 performance in this area had been the subject of discussion during both the Office of Price-Anderson Enforcement (OE) onsite investigation, held during October 2003, and the subsequent enforcement conference held on January 22, 2004. On August 5, 2004, BWXT Y-12 submitted Noncompliance Tracking System (NTS) report number NTS-Y12- -BWXT-Y12NUCLEAR-2004-0007, titled Corrective Actions

147

Enforcement Letter - Argonne-East  

Broader source: Energy.gov (indexed) [DOE]

3, 1997 3, 1997 Dr. William H. Hannum Argonne National Laboratory-East 9700 South Cass Avenue Argonne, Il 60439 Re: Noncompliance Report NTS-CH-AA-ANLE-ANLE-1996-0001 Dear Dr. Hannum: This letter refers to the Department of Energy's (DOE) evaluation of Argonne National Laboratory-East's (ANL-E) report of a potential noncompliance with the requirements of 10 CFR 835 (Occupational Radiation Protection). This potential noncompliance, which involved the failure to complete the required radiological worker training or retraining for approximately 30 percent of ANL-E's 797 radiological workers, was identified by ANL-E on December 17, 1996, and reported to DOE on December 20, 1996. On November 22, 1996, ANL-E initiated a review of the personnel training records of a

148

Enforcement Letter - ELBWXT082902WS  

Broader source: Energy.gov (indexed) [DOE]

858 858 August 29, 2002 Dr. D. B. Shipp [ ] Bechtel BWXT Idaho, L.L.C. 2525 Freemont Avenue Idaho Falls, Idaho 83415 Subject: RWMC Enforcement Letter (NTS-ID--BBWI-RWMC-2002-0002) Dear Dr. Shipp: During July 16-17, 2002, personnel from the DOE Office of Price-Anderson Enforcement (OE) conducted an onsite investigation at the Radioactive Waste Management Complex (RWMC) of multiple events occurring during 2001-2002. The events all involved transuranic (TRU) waste characterization, handling, and shipping activities. The investigation included a detailed review of the March 2002 event in which an incorrect payload of TRU waste drums was shipped to the Waste Isolation Pilot Plant (WIPP). OE also reviewed an additional seven similar events occurring in

149

Roberson Letter - June 2, 2003  

Broader source: Energy.gov (indexed) [DOE]

, 2003 , 2003 Mr. Monte Wilson Chair Idaho National Engineering Laboratory Citizens Advisory Board 1055 Dear Mr. Wilson: This in response to your March 29, 2003, letter regarding the recommendations on transuranic (TRLD waste management suggested by the Office of Environmental Management Site-Specific Advisory Boards (SSABs). Let me extend my appreciation for the time and effort put forth by the SSABs in developing a comprehensive set of recommendations to accelerate cleanup of TRU waste sites across the complex. We agree in principle with the recommendations. The recommendations support concepts presented in the National Transuranic Waste Management Plan, the Performance Management Plan for Transuranic Waste, and recent and ongoing TRU waste studies by the National Research Council. We are

150

Letter to Grossenbacher | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Letter to Grossenbacher Letter to Grossenbacher Letter to Grossenbacher This letter refers to the Department of Energy (DOE) investigation into the facts and circumstances associated with the fume hood fire that occurred in building TRA-668 at the Reactor Technology Complex on June 12, 2007, and the electrical shock of two firefighters responding to a wildland fire at the Idaho National Laboratoryon July 14, 2007. The results of our investigation were discussed with you and members of your staff on November 8, 2007, the final day of the onsite portion of our investigation, and provided to you in an lnvestigation Report dated December 5, 2007. Preliminary Notice of Violation, Battelle Energy Alliance, LLC - WEA-2008-01, Preliminary - March 20, 2008 More Documents & Publications

151

2008 MERRTT Revision Letter | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8 MERRTT Revision Letter 8 MERRTT Revision Letter 2008 MERRTT Revision Letter The 2008 version of MERRTT includes several enhancements, but the primary enhancement is the addition of the decontamination dress-down video. Comments received on the decontamination video script in the fall 2006 were incorporated into the script and the filming and final editing were completed in the spring 2007. The decontamination video was added to MERRTT to support the students' understanding of the decontamination dress-down process at an accident scene. Additional enhancements included the streamlining of objectives from the Terminology & Units and Assessing Package Integrity modules into other existing modules. 2008 MERRTT Revision Letter More Documents & Publications 2009 TEPP Annual Report

152

Unraveling life four letters at a time  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Unraveling life four letters at a time Unraveling life four letters at a time 1663 Los Alamos science and technology magazine Latest Issue:November 2013 All Issues » submit Unraveling life four letters at a time Major advances in sequencing since the official end of the Human Genome Project are fueling a revolution in genomics research. November 25, 2013 Unraveling life four letters at a time Reading the genetic code of life keeps getting faster and cheaper, bringing more and more new discoveries within reach. The genomics revolution that came after the Human Genome Project The Human Genome Project officially ended in 2003, but the 10 years since have seen dramatic improvements in genomics technology and discovery. New, rapid sequencing machines provide high throughput conversion of genetic material (DNA or RNA) into data to be arranged into its proper order by a

153

College of Arts and Letters Africana Studies  

E-Print Network [OSTI]

and Portuguese Languages and Literatures Sustainability Urban Studies Women's Studies College of BusinessCollege of Arts and Letters Africana Studies American Indian Studies Anthropology Asia Pacific Marketing College of Education Administration, Rehabilitation and Postsecondary Education Child and Family

Gallo, Linda C.

154

Commentaries and Notes to the Philosophical Letters  

Science Journals Connector (OSTI)

A letter written by Ekaterina D. Panova to Peter Chaadaev in which she expressed her religious anxieties and also her fears that Chaadaev had suspicions about her real motives in talking with him about religio...

Raymond T. McNally; Richard Tempest

1991-01-01T23:59:59.000Z

155

LETTER TO SUCCESSFUL COMPANY OR ESCO  

Broader source: Energy.gov [DOE]

Document features a letter template and sample to help Federal agencies inform an energy services company (ESCO) that it has been selected in accordance with its expression of interest to a Notice of Opportunity (NOO).

156

Acquisition Letters Archives | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Acquisition Letters Archives Acquisition Letters Archives Acquisition Letters Archives 95-06, 06/28/95, Personal Property Letter System 95-14, 11/17/95, PDF, Subcontracts Under the New Independent States Program 96-09, 9/16/96, PDF, Full and Open Competition - Management & Operating Contracts 98-11, 9/18/98, PDF, Waiver of Synopsis Requirements 99-04, 6/23/99, PDF, Consortium Buying 99-06, 8/27/99, PDF, DOE Authorized Subcontract for Use by DOE M&O Contractors with New Independent States Scientific Institutes Through the International Science & Technology Center Attachment to AL 99-06 Model Subcontract 2000-05, 5/17/2000, PDF, DOE Authorized Subcontract for Use by DOE M&O Management and Operating (M&O) Contractors with New Independent States' Scientific Institutes through Science and Technology in Ukraine

157

Letter to NeuroscienceLetter to Neuroscience ACROLEIN INFLICTS AXONAL MEMBRANE DISRUPTION AND  

E-Print Network [OSTI]

Letter to NeuroscienceLetter to Neuroscience ACROLEIN INFLICTS AXONAL MEMBRANE DISRUPTION, IN 47907-1244, USA Key words: free radicals, lipid peroxidation. We have examined the e¡ect of acrolein found that 200 WM acrolein, but not 50 WM, induced a time-dependent loss of compound action potential

Shi, Riyi

158

Letter: The Environmental Management SSABs Recommendations on Transuranic  

Broader source: Energy.gov (indexed) [DOE]

The Environmental Management SSABs Recommendations on The Environmental Management SSABs Recommendations on Transuranic Waste Management Letter: The Environmental Management SSABs Recommendations on Transuranic Waste Management From: Assistant Secretary, Jessie H. Roberson (EM-1) To: Mr. Monte Wilson, Chair, Idaho National Engineering Laboratory Citizens Advisory Board 1055 This letter is in response to a March 29, 2003, letter regarding the recommendations on transuranic (TRLD waste management suggested by the Office of Environmental Management Site-Specific Advisory Boards (SSABs). Roberson Letter - June 2, 2003 More Documents & Publications Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs Letter: Restructuring & Managing of the Procurement Mechanisms Supporting

159

Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding  

Broader source: Energy.gov (indexed) [DOE]

Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific Advisory Boards Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific Advisory Boards Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific Advisory Boards Roberson Letter - September 25, 2003 More Documents & Publications Letter: Restructuring & Managing of the Procurement Mechanisms Supporting

160

Letter: Implementation of the Guidance for the Environmental Management  

Broader source: Energy.gov (indexed) [DOE]

Implementation of the Guidance for the Environmental Implementation of the Guidance for the Environmental Management Site Specific Advisory Boards Letter: Implementation of the Guidance for the Environmental Management Site Specific Advisory Boards From: Assistant Secretary, Jessie H. Roberson (EM-1) To: Wade Waters, Chair, Savannah River Citizens' Advisory Board This letter is in response to a July 29, 2003 letter regarding implementation of the guidance for the Environmental Management Site Specific Advisory Boards. Roberson Letter - August 15, 2003 More Documents & Publications Memorandum: Regarding Delegation of Designated Federal Officials for Site Specific Advisory Boards Letter: Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs Letter: Restructuring & Managing of the Procurement Mechanisms Supporting

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding  

Broader source: Energy.gov (indexed) [DOE]

Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific Advisory Boards Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific Advisory Boards Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific Advisory Boards Roberson Letter - September 25, 2003 More Documents & Publications Letter: Restructuring & Managing of the Procurement Mechanisms Supporting

162

Letter: Direction and Guidance for Implementing Direct DOE Relationship &  

Broader source: Energy.gov (indexed) [DOE]

Letter: Direction and Guidance for Implementing Direct DOE Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs From: Assistant Secretary, Jessie Hill Roberson (EM-11) To: Mr. Monte Wilson, Chair, INEEL Citizens Advisory Board This letter is in response to a November 21, 2003 letter regarding direction and guidance for implementing direct DOE relationship and funding for Environmental Management Site Specific Advisory Boards. Roberson Letter - December 12, 2003 More Documents & Publications Letter: Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs Letter: Mission, Objectives & Scope of the Site Specific Advisory Board Memorandum: Direction and Guidance for Implementing Direct DOE Relationship

163

Letter: Direction and Guidance for Implementing Direct DOE Relationship &  

Broader source: Energy.gov (indexed) [DOE]

Letter: Direction and Guidance for Implementing Direct DOE Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs Letter: Direction and Guidance for Implementing Direct DOE Relationship & Funding for EMSSABs From: Assistant Secretary, Jessie Hill Roberson (EM-11) To: Mr. Monte Wilson, Chair, INEEL Citizens Advisory Board This letter is in response to a November 21, 2003 letter regarding direction and guidance for implementing direct DOE relationship and funding for Environmental Management Site Specific Advisory Boards. Roberson Letter - December 12, 2003 More Documents & Publications Letter: Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs Letter: Mission, Objectives & Scope of the Site Specific Advisory Board Memorandum: Direction and Guidance for Implementing Direct DOE Relationship

164

Enforcement Letter, Oak Ridge National Laboratory LLC- May 13...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 May 13, 2009 Issued to UT-Battelle, LLC related to a...

165

Enforcement Letter, LVI Services Inc. - October 28, 2013 | Department...  

Energy Savers [EERE]

Letter, LVI Services Inc. - October 28, 2013 July 8, 2014 Worker Safety and Health Enforcement Letter issued to LVI Services Inc. On October 28, 2013, the U.S....

166

Army Corps of Engineers - Regulatory Guidance Letters | Open...  

Open Energy Info (EERE)

Guidance Letters Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Army Corps of Engineers - Regulatory Guidance Letters Abstract This webpage provides a...

167

Sandia aids FBI in investigation of anthrax letters  

ScienceCinema (OSTI)

Paul Kotula and Joe Michael of Sandia National Laboratories discuss their work in the FBI anthrax letters investigation.

Paul Kotula and Joe Michael

2010-01-08T23:59:59.000Z

168

The effects of mnemonics on letter recognition and letter sound acquisition of at-risk kindergarten students  

E-Print Network [OSTI]

This study examined the effectiveness of embedded picture mnemonic alphabet cards on the acquisition of letter name and letter sound knowledge with at-risk kindergarten students in a rural Texas public school. The study compared student achievement...

White, Teresa

2009-05-15T23:59:59.000Z

169

Half a Century of Physical Review Letters  

ScienceCinema (OSTI)

Fifty years ago, Sam Goudsmit started an experiment: the journal Physical Review Letters. Since 1958, the experiment has thrived. PRL has gone through many changes, published many important papers, and become a leader in international scientific publication. I will trace the rise of PRL from its early 20th century roots as "Letters to the Editor," through changes in editorial process and advents of new technology. Along the way I'll show what has gone on behind the scenes, and give a glimpse of our plans for the future. I'll also give some advice to would-be authors and referees, illustrated with interesting correspondence we've received.

Robert Garisto

2010-01-08T23:59:59.000Z

170

Letter: Restructuring & Managing of the Procurement Mechanisms Supporting  

Broader source: Energy.gov (indexed) [DOE]

Restructuring & Managing of the Procurement Mechanisms Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs Letter: Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs From: Assistant Secretary, Jessie H. Roberson (EM-1) To: The Honorable J. Gresham Barrett U.S. House of Representatives This letter is in response to an August 8, 2003 letter regarding Assistant Secretary Roberson's guidance memorandum providing direction for restructuring and managing the procurement mechanisms that support the activities of the Environmental Management (EM) Site Specific Advisory Boards (SSABs). Roberson Letter - September 25, 2003 More Documents & Publications Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding

171

Letter: Restructuring & Managing of the Procurement Mechanisms Supporting  

Broader source: Energy.gov (indexed) [DOE]

Restructuring & Managing of the Procurement Mechanisms Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs Letter: Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs From: Assistant Secretary, Jessie H. Roberson (EM-1) To: The Honorable J. Gresham Barrett U.S. House of Representatives This letter is in response to an August 8, 2003 letter regarding Assistant Secretary Roberson's guidance memorandum providing direction for restructuring and managing the procurement mechanisms that support the activities of the Environmental Management (EM) Site Specific Advisory Boards (SSABs). Roberson Letter - September 25, 2003 More Documents & Publications Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding

172

CFL Manufacturers: ENERGY STAR Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CFL Manufacturers: ENERGY STAR Letters CFL Manufacturers: ENERGY STAR Letters CFL Manufacturers: ENERGY STAR Letters January 25, 2010 DOE issued letters to 25 manufacturers of compact fluorescent lamps (CFLs) involving various models after PEARL Cycle 9 testing indicated that the models do not meet the ENERGY STAR specification and, therefore, are disqualified from the ENERGY STAR Program. When a product is disqualified from the ENERGY STAR Program, all corresponding packaging and supplier's products will be disqualified as well. CFL Manufacturers: ENERGY STAR Letters More Documents & Publications Ex Parte Communication Memo Identifying Cost-Effective Residential Energy Efficiency Opportunities for the Kauai Island Utility Cooperative Realizing Building End-Use Efficiency with Ermerging Technologies

173

Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 |  

Broader source: Energy.gov (indexed) [DOE]

June June 2, 2005 Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 June 2, 2005 Enforcement Letter Issued to Lawrence Livermore National Laboratory for Quality Assurance Deficiencies related to Weapon Activities, June 2, 2005 This letter is to inform you of the Department of Energy's (DOE) concern regarding several quality assurance-related deficiencies involving actions by Lawrence Livermore National Laboratory (LLNL) personnel. These deficiencies were associated with a cracked explosive event that occurred at the Pantex site in January 2004. The timing of this letter is intended to coincide with a DOE enforcement action stemming from this event. Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 More Documents & Publications

174

Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 |  

Broader source: Energy.gov (indexed) [DOE]

June June 2, 2005 Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 June 2, 2005 Enforcement Letter Issued to Lawrence Livermore National Laboratory for Quality Assurance Deficiencies related to Weapon Activities, June 2, 2005 This letter is to inform you of the Department of Energy's (DOE) concern regarding several quality assurance-related deficiencies involving actions by Lawrence Livermore National Laboratory (LLNL) personnel. These deficiencies were associated with a cracked explosive event that occurred at the Pantex site in January 2004. The timing of this letter is intended to coincide with a DOE enforcement action stemming from this event. Enforcement Letter, Lawrence Livermore National Laboratory - June 2, 2005 More Documents & Publications

175

CFL Manufacturers: ENERGY STAR Letters | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

CFL Manufacturers: ENERGY STAR Letters CFL Manufacturers: ENERGY STAR Letters CFL Manufacturers: ENERGY STAR Letters January 25, 2010 DOE issued letters to 25 manufacturers of compact fluorescent lamps (CFLs) involving various models after PEARL Cycle 9 testing indicated that the models do not meet the ENERGY STAR specification and, therefore, are disqualified from the ENERGY STAR Program. When a product is disqualified from the ENERGY STAR Program, all corresponding packaging and supplier's products will be disqualified as well. CFL Manufacturers: ENERGY STAR Letters More Documents & Publications Ex Parte Communication Memo Realizing Building End-Use Efficiency with Ermerging Technologies Identifying Cost-Effective Residential Energy Efficiency Opportunities for the Kauai Island Utility Cooperative

176

LETTERS TO THE EDITOR Maternal Cell Phone  

E-Print Network [OSTI]

LETTERS TO THE EDITOR Maternal Cell Phone Use and Behavioral Problems in Children To the Editor and postnatal exposure to cell phone use and behav- ioral problems in children. Epidemiology. 2008;19:523­529. 2 and postnatal mobile phone usage. They caution against assum- ing a causal relationship from exposure

Helle, Samuli

177

Information Technology Letter from the Director  

E-Print Network [OSTI]

Technology Roadmap, ITL is helping to translate mission requirements into technical portability, inInformation Technology Laboratory #12;Letter from the Director I n November 2011, I became the Director of the Information Technology Laboratory (ITL), one of six research laboratories within

178

IN-FOCUSIN-FOCUS Letters&Science  

E-Print Network [OSTI]

wastewater to prevent toxic heavy metals from infiltrating the water supply. Failure to do so incurs heavy2013May IN-FOCUSIN-FOCUS Letters&Science Chemists' invention helps companies reduce water pollution that change how they react to light based on how much metal is in the surrounding water. Light is sent down

Saldin, Dilano

179

b018.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

00) 00) 3/2 - I (J P ) = 1 2 ( 3 2 - ) Status: ∗∗∗ Most of the results published before 1975 are now obsolete and have been omitted. They may be found in our 1982 edition, Physics Let- ters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). The various partial-wave analyses do not agree very well. The latest GWU analysis (ARNDT 06) finds no evidence for this resonance. N(1700) BREIT-WIGNER MASS N(1700) BREIT-WIGNER MASS N(1700) BREIT-WIGNER MASS N(1700) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1650 to 1750 (≈ 1700) OUR ESTIMATE 1650 to 1750 (≈ 1700) OUR ESTIMATE 1650 to 1750 (≈ 1700) OUR ESTIMATE 1650 to 1750 (≈ 1700) OUR ESTIMATE 1790± 40 ANISOVICH 12A DPWA Multichannel 1675± 25 CUTKOSKY 80 IPWA π N → π N 1731± 15 HOEHLER 79 IPWA π N → π N * * * We do not use the

180

CX-010369: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Alterations to Existing Buildings Construction of Small-Scale Support Structures and Relocation of Machinery and Equipment CX(s) Applied: B1.11; B1.15; B1.31 Date: 11/09/2012 Location(s): Tennessee, California, Virginia Offices(s): Berkeley Site Office

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

CX-000568: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Neutron imaging of metal hydride beds at Oak Ridge National Laboratory, Spallation Neutron SourceCX(s) Applied: B1.11, B1.13, B3.6Date: 12/30/2009Location(s): TennesseeOffice(s): Sandia Site Office

182

CX-010416: Categorical Exclusion Determination | Department of...  

Broader source: Energy.gov (indexed) [DOE]

B1.7, B1.11, B1.27, B1.31, B1.33, B2.2, B2.3, B2.5, B4.6 Date: 05172013 Location(s): Colorado, Wyoming, Nebraska, Montana, Utah Offices(s): Western Area Power...

183

Review of particle properties  

Science Journals Connector (OSTI)

This review of the properties of leptons, mesons, and baryons is an updating of the Review of Particle Properties, Particle Data Group [Phys. Lett. 111B (1982)]. Data are evaluated, listed, averaged, and summarized in tables. Numerous tables, figures, and formulae of interest to particle physicists are also included. A data booklet is available.

C. G. Wohl; R. N. Cahn; A. Rittenberg; T. G. Trippe; G. P. Yost; F. C. Porter; J. J. Hernandez; L. Montanet; R. E. Hendrick; R. L. Crawford; M. Roos; N. A. Trnqvist; G. Hhler; M. Aguilar-Benitez; T. Shimada; M. J. Losty; G. P. Gopal; Ch. Walck; R. E. Shrock; R. Frosch; L. D. Roper; W. P. Trower; B. Armstrong (Particle Data Group)

1984-04-01T23:59:59.000Z

184

b019.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

00) 00) 3/2 + I (J P ) = 3 2 ( 3 2 + ) Status: ∗∗∗ Most of the results published before 1975 are now obsolete and have been omitted. They may be found in our 1982 edition, Physics Let- ters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). The various analyses are not in good agreement. ∆(1600) BREIT-WIGNER MASS ∆(1600) BREIT-WIGNER MASS ∆(1600) BREIT-WIGNER MASS ∆(1600) BREIT-WIGNER MASS VALUE (MeV) DOCUMENT ID TECN COMMENT 1500 to 1700 (≈ 1600) OUR ESTIMATE 1500 to 1700 (≈ 1600) OUR ESTIMATE 1500 to 1700 (≈ 1600) OUR ESTIMATE 1500 to 1700 (≈ 1600) OUR ESTIMATE 1510± 20 ANISOVICH 12A DPWA Multichannel 1600± 50 CUTKOSKY 80 IPWA π N → π N 1522± 13 HOEHLER 79 IPWA π N → π N * * * We do not use the following data for averages, fits, limits, etc. * * * 1626± 8 SHRESTHA 12A

185

b017.dvi  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 7 N(1990) 7/2 + I (J P ) = 1 2 ( 7 2 + ) Status: ∗∗ OMITTED FROM SUMMARY TABLE Most of the results published before 1975 are now obsolete and have NODE=B017 been omitted. They may be found in our 1982 edition, Physics Let- ters 111B 111B 111B 111B 1 (1982). Some further obsolete results published before 1984 were last included in our 2006 edition, Journal of Physics, G 33 33 33 33 1 (2006). The various analyses do not agree very well with one another. The latest GWU analysis (ARNDT 06) finds no evidence for this resonance. N(1990) BREIT-WIGNER MASS N(1990) BREIT-WIGNER MASS N(1990) BREIT-WIGNER MASS N(1990) BREIT-WIGNER MASS NODE=B017M NODE=B017M VALUE (MeV) DOCUMENT ID TECN COMMENT ≈ 1990 OUR ESTIMATE ≈ 1990 OUR ESTIMATE ≈ 1990 OUR ESTIMATE ≈ 1990 OUR ESTIMATE → UNCHECKED ← 2060 ± 65 ANISOVICH 12A DPWA Multichannel 1970 ± 50 CUTKOSKY 80 IPWA π N → π N 2005 ± 150 HOEHLER 79 IPWA

186

Enforcement Letter -Chicago-02/24/2000  

Broader source: Energy.gov (indexed) [DOE]

4, 2000 4, 2000 Yoon I. Chang, PhD [ ] Argonne National Laboratory-East 9700 South Cass Avenue Argonne, IL 60439-4832 Subject: Enforcement Letter (NTS-CH-AA-ANLE-ANLE-1999-0009) Dear Dr. Chang: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the above referenced Noncompliance Tracking System (NTS) report describing bioassay program deficiencies at Argonne National Laboratory- East (ANL-E). This report was submitted to DOE on December 23, 1999. Approximately thirteen months previous to this NTS report's submittal, DOE's Office of Enforcement and Investigation (EH-Enforcement) issued to all DOE and contractor Price-Anderson Amendments Act coordinators a memorandum explaining EH-Enforcement's experience with and concern regarding contractor bioassay program

187

NNSA Policy Letter: NAP-4B  

National Nuclear Security Administration (NNSA)

Policy Letter: NAP-4B Policy Letter: NAP-4B Date: June 30,2008 TITLE: Corporate Performance Evaluation Process for M&O Contractors I. OBJECTIVE: To establish and implement a uniform, corporate process for evaluation of National Nuclear Security Administration (NNSA) Management and Operating (M&O) contractors' performance that promotes effective and efficient accomplishment of the NNSA mission while balancing safety and production effectively. This process results in documented, consistent and fair evaluation of M&O contractor performance. 11. APPLICABILITY: This process applies to all NNSA organizations and elements excluding NA-30. The Contractor Performance Evaluation Process will be an "NNSA-corporate," integrated process applied consistently by all NNSA sites. The corporate process may be updated

188

Enforcement Letter - Hanford - 04/16/2002  

Broader source: Energy.gov (indexed) [DOE]

6, 2002 6, 2002 Mr. Kent A. Campbell [ ] Fluor Federal Services 1200 Jadwin Richland, WA 99352 Subject: Enforcement Letter Dear Mr. Campbell: This letter refers to an evaluation by the Department of Energy (DOE) of a December 18, 2001, report of noncompliances with the information requirement provision of 10 CFR 820.11. The noncompliances, described below, were identified by the Pacific Northwest National Laboratory (PNNL) and involve employees of your company. 10 CFR 820.11 requires that any information pertaining to a nuclear activity provided to DOE or maintained for inspection by DOE shall be complete and accurate in all material respects. This provision applies to documentation associated with personnel training requirements for access to nuclear facilities.

189

Enforcement Letter -Idaho-08/04/1998  

Broader source: Energy.gov (indexed) [DOE]

4, 1998 4, 1998 Mr. John Denson [ ] Lockheed Martin Idaho Technologies Company P.O.Box 1625 Idaho Falls, ID 83415 Subject: Enforcement Letter Noncompliance Report NTS-ID--LITCOSITEW-1998-0001 Dear Mr. Denson: This letter refers to the Department of Energy=s (DOE) evaluation of the Lockheed Martin Idaho Technologies Company (LMITCO) subject Noncompliance Tracking System (NTS) report for noncompliances with the requirements of 10 CFR 830.120, "Quality Assurance Requirements." The NTS report addresses a repetitive problem of maintaining the operability of radiation monitoring instrumentation and systems referenced in nuclear facilities authorization basis documents. The repetitive problem was identified by LMITCO on February 27, 1998, and reported to DOE on

190

Enforcement Letter - Oakland-11/02/1999  

Broader source: Energy.gov (indexed) [DOE]

5, 1999 5, 1999 Dr. Robert W. Kuckuck [ ] Lawrence Livermore National Laboratory P.O. Box 808, L-005 Livermore, CA 94551-0808 Subject: Enforcement Letter (NTS-OAK--LLNL-LLNL-1999-0004, NTS-OAK--LLNL- LLNL-1999-0006, NTS-OAK--LLNL-LLNL-1999-0007) Dear Dr. Kuckuck: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning issues related to the maintenance and adherence to documents which form the authorization basis for Lawrence Livermore National Laboratory (LLNL) operated nuclear facilities. Specifically, three Noncompliance Tracking System (NTS) reports were submitted over a four-day period and are summarized below: 1. On July 30, 1999, it was reported that two cabinets contained about [specified amount] of [ ] solvents in violation of the building Safety Analysis Documentation;

191

Post-Closure Inspection Letter Report for Corrective Action Units (CAUs) on the Nevada National Security Site (NNSS)  

SciTech Connect (OSTI)

This letter serves as the post-closure inspection letter report for CAUs on the NNSS for Calendar Year 2011

NSTec Environmental Restoration

2012-05-16T23:59:59.000Z

192

The Ellison Letter Machine @ Queen's U Education Library Ellison: http://ellison.com Ellison Education: http://ellisoneducation.com  

E-Print Network [OSTI]

football helmet pennant soccer ball whistle #12;3 Language Letters, Numbers & Symbols 2" Capital Letters A

Abolmaesumi, Purang

193

Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4,  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Letter, Lockheed Martin Idaho Technologies Company - Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4, 1998 Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4, 1998 August 4, 1998 Issued to Lockheed Martin Idaho Technologies Company related to a Repetitive Problem with Instrument Operability at the Idaho National Engineering and Environmental Laboratory This letter refers to the Department of Energy's (DOE) evaluation of the Lockheed Martin Idaho Technologies Company (LMITCO) subject Noncompliance Tracking System (NTS) report for noncompliances with the requirements of 10 CFR 830.120, "Quality Assurance Requirements." The NTS report addresses a repetitive problem of maintaining the operability of radiation monitoring instrumentation and systems referenced in nuclear facilities authorization

194

Microsoft Word - DOE MEBA Storage letter.doc  

Office of Environmental Management (EM)

Ave. SW Washington, DC 20585 RE: Notification of intent to store elemental mercury Dear Secretary Chu: This letter is being submitted in accordance with the provisions...

195

Letter: Transition of Closure Sites from the Office of Environmental...  

Office of Environmental Management (EM)

Transition of Closure Sites from the Office of Environmental Management to other DOE Organizations Letter: Transition of Closure Sites from the Office of Environmental Management...

196

Enforcement Letter, Argonne National Laboratory-East - February...  

Broader source: Energy.gov (indexed) [DOE]

February 24, 2000 Enforcement Letter, Argonne National Laboratory-East - February 24, 2000 February 24, 2000 Issued to Argonne National Laboratory related to Bioassay Program...

197

Enforcement Letter, Argonne National Laboratory-East - August...  

Broader source: Energy.gov (indexed) [DOE]

August 6, 1996 Enforcement Letter, Argonne National Laboratory-East - August 6, 1996 August 6, 1996 Issued to the University of Chicago related to an Unplanned and Uncontrolled...

198

Enforcement Letter, Argonne National Laboratory-East - April...  

Broader source: Energy.gov (indexed) [DOE]

April 23, 1997 Enforcement Letter, Argonne National Laboratory-East - April 23, 1997 April 23, 1997 Issued to the University of Chicago related to Radiological Worker Training and...

199

Policy Flash 2014-29 Acquisition Letter 07 - Benchmark Compensation...  

Energy Savers [EERE]

07 - Benchmark Compensation Amount for Individual Executive Salary Actions Policy Flash 2014-29 Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive...

200

EERE Postdoctoral Research Awards Letter of Support from Research Mentor  

Broader source: Energy.gov [DOE]

EERE Postdoctoral Research Awards Letter of Support from Research Mentor, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Letter from Secretary Samuel Bodman's to Speaker Dennis Hastert...  

Broader source: Energy.gov (indexed) [DOE]

of provisions to facilitate the licensing, construction, and operation of a repository at Yucca Mountain. Letter from Secretary Samuel Bodman's to Speaker Dennis Hastert suggesting...

202

Letter from Secretary Samuel Bodman's to President of the Senate...  

Broader source: Energy.gov (indexed) [DOE]

of provisions to facilitate the licensing, construction, and operation of a repository at Yucca Mountain. Letter from Secretary Samuel Bodman's to President of the Senate Richard...

203

Letter to Congress RE: Office of Civilian Radioactive Waste Management...  

Broader source: Energy.gov (indexed) [DOE]

to Congress RE: Office of Civilian Radioactive Waste Management's Annual Financial Report Letter to Congress RE: Office of Civilian Radioactive Waste Management's Annual Financial...

204

Secretary Moniz's Open Invitation Letter to AEM | Department...  

Broader source: Energy.gov (indexed) [DOE]

Letter to AEM More Documents & Publications Secretary Ernest Moniz Official Portraits Deputy Secretary Elizabeth Sherwood-Randall Official Portrait Lumens Education Poster...

205

Carbon 40 (2002) 445467 Letters to the editor  

E-Print Network [OSTI]

Carbon 40 (2002) 445­467 Letters to the editor Increasing the electromagnetic interference; Activated carbon; Carbon fibers; D. Electrical (electronic) properties Electromagnetic interference (EMI

Chung, Deborah D.L.

206

Letter of Direction to Contractor | Department of Energy  

Office of Environmental Management (EM)

River Site Saltstone Disposal Facility (SDF), and authorizes the required start-up testing excluding dispostion of the Tank 50 waste to SDU 2. Letter of Direction to...

207

EM SSAB Recommendations and Letters - 2014-03 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

and Letters - 2014-03 Documents Available for Download Recommendation to EM Regarding Recycling of Metals and Materials (04-04-14) Response (041114) More Documents & Publications...

208

EM SSAB Recommendations and Letters - 2009-01 | Department of...  

Office of Environmental Management (EM)

272009) More Documents & Publications Recommendation 221: Recommendation Regarding Recycling of Metals and Materials EM SSAB Recommendations and Letters - 2014-03 EM SSAB...

209

Letter from Elizabeth Chimento and Poul Hertel to the Federal...  

Broader source: Energy.gov (indexed) [DOE]

Potomac River Power Plant" Letter from Elizabeth Chimento and Poul Hertel to the Federal Energy Regulatory Commission Re: District of Columbia Public Service Commission Emergency...

210

Letter from Elizabeth Chimento and Poul Hertel to the Federal...  

Broader source: Energy.gov (indexed) [DOE]

before the Commission. Letter from Elizabeth Chimento and Poul Hertel to the Federal Energy Regulatory Commission Re: District of Columbia Public Service Commission Emergency...

211

BPA Letter announcing draft contract for Direct Service Industries...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Parties: In its May 29 letter to the region, the Bonneville Power Administration (BPA) initiated a public discussion with parties to help the agency decide the amount of...

212

Enforcement Letter, NEL-2011-01 - March 31, 2011 | Department...  

Office of Environmental Management (EM)

and decommissioning activities on or near uranium hexafluoride and hydrofluoric acid lines at DOE's Paducah Gaseous Diffusion Plant. Enforcement Letter, NEL-2011-01 More...

213

Letters of Support | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

These include: A letter of support from the applicant's primary graduate thesis advisor, and A letter of support from the applicant's proposed collaborating research...

214

Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation...  

Office of Environmental Management (EM)

4 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified Workers Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified...

215

Cover Letters Cover letters are a vital part of any job application process. The guidelines  

E-Print Network [OSTI]

resume. Each cover letter must be individually written to focus your skills, experiences, abilities: Resume" in the bottom left margin if your resume is enclosed. Structure and Content of an Effective Cover for his or her consideration. Sincerely (or Yours) Signature Your Name Enclosure: Resume (if your resume

Wu, Shin-Tson

216

GENERAL LETTER 2008-3 DATE: October 20, 2008  

E-Print Network [OSTI]

Management Liaison Officers FROM: Eunice G. DiBella, CRM Public Records Administrator SUBJECT: Off-site at off-site storage facilities. This letter replaces General Letter #3: Off-site Commercial Storage Facilities (revised 07/1999). OFF-SITE PUBLIC RECORDS STORAGE FACILITIES State agencies may store public

Oliver, Douglas L.

217

How can the Vanderbilt Career Center help? RESUME & COVER LETTER...  

E-Print Network [OSTI]

How can the Vanderbilt Career Center help? RESUME & COVER LETTER... Need to create a resume or cover letter? Go to www.vanderbilt.edu/career and click on Online Resources. From here you will select Optimal Resume. Here you will create an account and select a template for you to plug in your

Bordenstein, Seth

218

Parallel Processing Letters fc World Scientific Publishing Company  

E-Print Network [OSTI]

that occurred on a production site of EGEE and the troubleshooting process for each case. Finally, we proposeParallel Processing Letters fc World Scientific Publishing Company FAILURE MANAGEMENT IN GRIDS infrastructure [1] in the context #12;Parallel Processing Letters of a drug-design effort [12], indicate

Pallis, George

219

Letter: Congratulating Oak Ridge SSAB and its Stewardship Committee for  

Broader source: Energy.gov (indexed) [DOE]

Letter: Congratulating Oak Ridge SSAB and its Stewardship Committee Letter: Congratulating Oak Ridge SSAB and its Stewardship Committee for Receiving the EPA's 2006 Citizen's Excellence in Community Involvement Award Letter: Congratulating Oak Ridge SSAB and its Stewardship Committee for Receiving the EPA's 2006 Citizen's Excellence in Community Involvement Award From: Assistant Secretary for Environmental Management, James A. Rispoli To: Mr. Kerry Trammell, Chair Site Specific Advisory Board This letter congratulaties Oak Ridge Site Specific Advisory Board and its Stewardship Committee on being awarded the Environmental Protection Agency's 2006 Citizen's Excellence in Community Involvement Award. Rispoli Letter - June 21, 2006 More Documents & Publications EM SSAB Conference Calls - October 20, 2005 EM SSAB Conference Calls - June 8, 2005

220

Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Division - October Waste Isolation Division - October 3, 2000 Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000 October 3, 2000 Issued to Westinghouse Waste Isolation Division related to Quality Assurance and Occupational Radiation Protection Noncompliances at the Waste Isolation Pilot Plant This letter refers to an evaluation by the Department of Energy (DOE) of four noncompliances with the requirements of the Quality Assurance Rule (10 CFR 830.120) and/or the Occupational Radiation Protection Rule (10 CFR 835) at the Waste Isolation Pilot Plant (WIPP). Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000 More Documents & Publications Enforcement Letter, Westinghouse Savannah River Company - July 21, 1998 Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Enforcement Letter, Lawrence Livermore National Security LLC, - May 15,  

Broader source: Energy.gov (indexed) [DOE]

Security LLC, - May Security LLC, - May 15, 2008 Enforcement Letter, Lawrence Livermore National Security LLC, - May 15, 2008 May 15, 2008 Enforcement Letter issued to Lawrence Livermore National Security, LLC related to the Protection of Classified Information at the Lawrence Livermore National Laboratory In our recent dialogue via televideo with your Deputy, safeguards and security director, and other key managers of your staff, we discussed our reasons for sending this enforcement letter to Lawrence Livermore National Security, LLC; the purpose of this letter; and our concerns about the protection of classified information at the Lawrence Livermore National Laboratory (LLNL). Accordingly, this is not a formal enforcement action and imposes no requirements. Enforcement Letter, Lawrence Livermore National Security LLC- May 15, 2008

222

Enforcement Letter, Los Alamos National Security LLC - May 15, 2008 |  

Broader source: Energy.gov (indexed) [DOE]

LLC - May 15, 2008 LLC - May 15, 2008 Enforcement Letter, Los Alamos National Security LLC - May 15, 2008 May 15, 2008 Enforcement Letter issued to Los Alamos National Security, LLC related to the Protection of Classified Information at the Los Alamos National Laboratory In our recent dialogue with you and members of your staff, we discussed our reasons for sending this enforcement letter to Los Alamos National Security, LLC (LANS); the purpose of this letter; and our concerns about the protection of classified information at the Los Alamos National Laboratory (LANL). Accordingly, this is not a formal enforcement action and imposes no requirements. We appreciate the laboratory's perspectives and your ongoing efforts to address these concerns. Enforcement Letter , Bechtel BWXT Idaho LLC - March 17, 2008

223

Enforcement Letter, Sandia Corporation - May 15, 2008 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Corporation - May 15, 2008 Corporation - May 15, 2008 Enforcement Letter, Sandia Corporation - May 15, 2008 May 15, 2008 Enforcement Letter issued to Sandia Corporation related to the Protection of Classified Information at the Sandia National Laboratories In our recent dialogue with Dr. Al Romig, Mr. Michael Hazen and members of your staff, we discussed our reasons for sending this enforcement letter to Sandia Corporation; the purpose of this letter; and our concerns about the protection of classified information at the Sandia National Laboratories (SNL). Accordingly, this is not a formal enforcement action and imposes no requirements. We appreciate the laboratories' perspectives and your ongoing efforts to address these concerns. Enforcement Letter, Sandia Corporation - May 15, 2008

224

Enforcement Letter, Bechtel BWXT Idaho - March 31, 2006 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Idaho - March 31, 2006 Idaho - March 31, 2006 Enforcement Letter, Bechtel BWXT Idaho - March 31, 2006 March 31, 2006 Enforcement Letter issued to Bechtel BWXT Idaho, LLC, related to External Radiation Dosimetry Accreditation Issues at the Idaho National Laboratory This letter is to inform you of the Department of Energy's (DOE) concern regarding a quality assurance-related deficiency stemming from the recent external radiation dosimetry performance testing by the DOE Laboratory Accreditation Program (DOELAP) of dosimeters utilized at Idaho National Laboratory (INL). This deficiency was identified through the quality assurance testing of external dosimeters by CH2MWG Idaho (CWI) staff. Enforcement Letter, Bechtel BWXT Idaho More Documents & Publications DOE-STD-1095-2011 Enforcement Letter, CH2M Hill - October 4, 2004

225

Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000  

Broader source: Energy.gov (indexed) [DOE]

Waste Isolation Division - October Waste Isolation Division - October 3, 2000 Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000 October 3, 2000 Issued to Westinghouse Waste Isolation Division related to Quality Assurance and Occupational Radiation Protection Noncompliances at the Waste Isolation Pilot Plant This letter refers to an evaluation by the Department of Energy (DOE) of four noncompliances with the requirements of the Quality Assurance Rule (10 CFR 830.120) and/or the Occupational Radiation Protection Rule (10 CFR 835) at the Waste Isolation Pilot Plant (WIPP). Enforcement Letter, Westinghouse Waste Isolation Division - October 3, 2000 More Documents & Publications Enforcement Letter, Westinghouse Savannah River Company - July 21, 1998 Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997

226

A Life in Letters: Personal Essays  

E-Print Network [OSTI]

, I needed to tear down all the walls that blocked self-knowledge, to find the keys that unlocked each door that barred my entrance into the world of the unknown, the cavernous spaces we shudder to revisit for fear of finding a slew of poisonous... the comforts of home something I, too, experienced. To Hell and Back, a letter to Susanna Kaysen, is a reflection on mental illness, on a depression that began in high school and became one of the primary struggles of my adult life. Whether I am...

Fangman, Ellen Mary

2008-12-16T23:59:59.000Z

227

Enforcement Letter - Los Alamos National Laboratory  

Broader source: Energy.gov (indexed) [DOE]

7, 1997 7, 1997 Dr. Sigfried S. Hecker [ ] Los Alamos National Laboratory P.O. Box 1663 Los Alamos, NM 87545 Subject: Noncompliance Report NTS-ALO-LA-LANL-LANL-1996-0004 Dear Dr. Hecker: This letter refers to the Department of Energy's (DOE's) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The noncompliances involved the failure of Los Alamos National Laboratory (LANL) to adequately implement the requirements contained in the governing quality assurance standard for stockpile evaluations in the areas of work controls and procedural compliance. As a result of these failures, an explosion and fire occurred at the [ ] on November 14, 1996.

228

RAMP Contractors Enforcement Letter, WEL-2014-03- May 21, 2014  

Broader source: Energy.gov [DOE]

Worker Safety and Health Enforcement Letter issued to Multiple National Nuclear Security Administration Contractors

229

Enforcement Letter, Parsons Technology Development & Fabrication Complex -  

Broader source: Energy.gov (indexed) [DOE]

Parsons Technology Development & Fabrication Parsons Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement's investigation into the facts and circumstances associated with quality assurance deficiencies in the fabrication of safety significant embed plates. These embed plates were fabricated by Parsons Technology Development and Fabrication Complex (PTDFC) a supplier to

230

Enforcement Letter-Sandia-07/21/1998  

Broader source: Energy.gov (indexed) [DOE]

Dr. Klaus Berkner [ ] University of California Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720 Subject: Enforcement Letter Noncompliance Report: NTS-SAN--LBL-NSD-1997-0002 Dear Dr. Berkner: This letter refers to the Department of Energy's (DOE) evaluation of Lawrence Berkeley National Laboratory's (LBNL) report of potential noncompliances with the requirements of 10 CFR 835 (Occupational Radiation Protection). The noncompliances involved the repeated failure of a laboratory researcher during 1996 - 1997 to adhere to LBNL's work authorization process and radiological work controls during research activities with a radioactive isotope, [ ]. On May 27, 1998, the Office of Enforcement and Investigation (EH-10) issued a letter to you,

231

Oct 2009 final concurrence letter for BPA  

Broader source: Energy.gov (indexed) [DOE]

Justice Justice Office of Dispute Resolution - - Washington, D.C. 20530 October 22,2009 The Honorable Steven Chu Secretary for the U.S. Department of Energy Washington, D.C. 20585 - . -- - . Dear Secretary Chu, This is in reference to the letter dated January 15,2009, fiom your predecessor, Honorable Samuel W. Bodman, which accompanied a policy document outlining guidance for the use of binding arbitration in specified cases by the Bonneville Power Administration. The Attorney General has reviewed the document "Bonneville Power Administration's Guidance on the Use of Binding Arbitration for BPA Contracts" and concurs with the proposed policy for use of binding arbitration which is contained therein. Mr. Holder's concurrence is dated October 9,2009.

232

LANL Enforcement Letter - 7/7/2003  

Broader source: Energy.gov (indexed) [DOE]

7, 2003 7, 2003 Vice Admiral George P. Nanos [ ] Los Alamos National Laboratory P.O. Box 1663 Los Alamos, NM 87545 Subject: Los Alamos National Laboratory Enforcement Letter Dear Admiral Nanos: The Office of Price-Anderson Enforcement (OE) is concerned that nuclear safety at the Los Alamos National Laboratory (LANL/Laboratory) continues to demonstrate a negative performance trend. Our observations are based on numerous recent events involving both nuclear safety and radiological control issues. Since our last discussions at the March 2003 LANL Price-Anderson Amendments Act Enforcement Conference, my office has reviewed numerous nuclear safety and radiological events as part of enforcement action follow-up and monitoring. The events

233

McSlarrow Letter - March 9, 2004  

Broader source: Energy.gov (indexed) [DOE]

04-000642 04-000642 The Deputy Secretary of Energy Washington, DC 20585 March 9, 2004 Mr. Todd Martin Chair, Hanford Advisory Board Dear Mr. Martin: Thank you for your January 15, 2004, letter to Under Secretary Card regarding the transition of closure sites from the Office of Environmental Management (EM) to other Department of Energy (DOE) organizations, specifically the Office of Legacy Management (LM). Public participation has been and continues to be an integral part of the DOE's cleanup efforts and the Site Specific Advisory Boards (SSABs) have contributed to improving public understanding of site operations. However, with the shift in mission from active cleanup to long-term surveillance and maintenance for closure sites, DOE will need to evaluate the appropriate level of public participation and the most

234

Enforcement Letter - Argonne National Laboratory East  

Broader source: Energy.gov (indexed) [DOE]

6, 1996 6, 1996 Dr. William H. Hannum Argonne National Laboratory-East 9700 South Cass Avenue Argonne, IL 60439 Re: Noncompliance Report NTS-CH-AA-ANLE-ANLEER-1996-0001 Dear Dr. Hannum: This letter refers to the Department of Energy's (DOE) evaluation of Argonne National Laboratory-East's (ANL-E) report of a potential noncompliance with the requirements of 10 CFR 835 (Occupational Radiation Protection). This potential noncompliance, which involved the unexpected, uncontrolled radiation exposure of an ANL-E temporary employee during January- August 1995 was identified by ANL-E on December 11, 1995, and reported to DOE on March 1, 1996, in the Noncompliance Tracking System (NTS). The exposure to the ANL-E temporary employee resulted from radiation streaming from a storage vault which was used to store a high level

235

Oak Ridge National Laboratory (ORNL) Enforcement Letter  

Broader source: Energy.gov (indexed) [DOE]

31, 2002 31, 2002 Dr. William J. Madia [ ] Oak Ridge National Laboratory P.O. Box 2008 Oak Ridge, TN 37831-6255 Subject: Oak Ridge National Laboratory (ORNL) Enforcement Letter Dear Dr. Madia: The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS- ORO--ORNL-X10PHYSICS-2002-0001. Our evaluation included review of the investigation report, associated corrective action plan, and discussion with site personnel. The subject NTS report described a series of deficiencies that resulted in several personnel being exposed to unanticipated radiation fields during the startup testing of an electron cyclotron resonance (ECR) source at the [facility]. The exposures occurred

236

Enforcement Letter - Brookhaven-12/18/1996  

Broader source: Energy.gov (indexed) [DOE]

Nicholas Samios Nicholas Samios [ ] Brookhaven National Laboratory Post Office Box 5000 Building 460 Upton, New York 11973-5000 Subject: Noncompliance Number NTS-CH-BH-BNL-PE-1996-0001 Dear Dr. Samios: This letter refers to the Department of Energy's (DOE) evaluation of Brookhaven National Laboratory's (BNL) report of potential noncompliances with the requirements of 10 CFR Part 835 (Occupational Radiation Protection Rule). These potential noncompliances involved a number of instances of contractor or subcontractor failure to: (1) comply with area radiological warning signs, (2) use protective clothing and equipment, (3) maintain radiation exposures as low as reasonably achievable (ALARA), or (4) complete radiological worker training. On May 22, 1996, BNL reported

237

Letter to DOE General Counsel from Whirlpool Senior Counsel, Re:  

Broader source: Energy.gov (indexed) [DOE]

Letter to DOE General Counsel from Whirlpool Senior Counsel, Re: Letter to DOE General Counsel from Whirlpool Senior Counsel, Re: Implementation of Alternative Test Procedure for Large Capacity Residential Clothes Washers Letter to DOE General Counsel from Whirlpool Senior Counsel, Re: Implementation of Alternative Test Procedure for Large Capacity Residential Clothes Washers Letter to DOE General Counsel from Whirlpool Senior Counsel, Re: Implementation of Alternative Test Procedure for Large Capacity Residential Clothes Washers After granting several waivers establishing an alternative test procedure for residential clothes washers, DOE sought the views of interested parties regarding the proper implementation of these waivers. Whirlpool responded to the DOE's inquiry with a number of comments to recommend a course of

238

DOE-L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND  

Broader source: Energy.gov (indexed) [DOE]

L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND L.__ PROPOSAL PREPARATION INSTRUCTIONS - COVER LETTER AND VOLUME I, OFFER AND OTHER DOCUMENTS (a) Instruction - Cover Letter. The cover letter shall include, but not be limited to, the following: (1) The solicitation number. (2) The name, address, telephone numbers, facsimile numbers, and electronic addresses of the Offeror. (3) A statement identifying any exceptions or deviations the Offeror is taking to the terms and conditions specified in the contract (Sections A through K of this solicitation, as amended). However, exceptions and/or deviations are not sought and the Government is under no obligation to enter into discussions. Exceptions or deviations may constitute a deficiency. (4) The names, titles, telephone numbers, facsimile numbers, and

239

Secretary Chu's Diversity Action Letter | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Secretary Chu's Diversity Action Letter Secretary Chu's Diversity Action Letter Secretary Chu's Diversity Action Letter In July 2011, the Office of Diversity Programs concluded a comprehensive review of DOE's workforce diversity and inclusion policies and programs. The findings from this analysis, which have been shared with DOE senior management, indicate that we can do more to create a culture that values diversity, which in turn will make the Department an employer of choice and enhance our mission effectiveness. Read more about these efforts here. This letter from Secretary Chu directs Associate Deputy Secretary Mel Williams to take action on the following issues: Dialogue and Feedback Recruitment and Hiring Retention, Development, and Promotions Commitment and Understanding Performance and Accountability

240

Letter from Secretary Steven Chu to Energy Department Employees |  

Broader source: Energy.gov (indexed) [DOE]

Letter from Secretary Steven Chu to Energy Department Employees Letter from Secretary Steven Chu to Energy Department Employees Letter from Secretary Steven Chu to Energy Department Employees February 1, 2013 - 11:00am Addthis U.S. Secretary of Energy Steven Chu during an online town hall to discuss President Obama's clean energy and innovation agenda on January 11, 2011. | Photo by Charles Watkins, Contractor, Energy Department U.S. Secretary of Energy Steven Chu during an online town hall to discuss President Obama's clean energy and innovation agenda on January 11, 2011. | Photo by Charles Watkins, Contractor, Energy Department Secretary Chu Secretary Chu Former Secretary of Energy In a letter to Energy Department employees today, Energy Secretary Steven Chu highlighted the tremendous progress of the last four years, and

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 |  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 May 13, 2009 Enforcement Letter issued to UT-Battelle, LLC related to a Radioactive Material Release at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory The Department of Energy's Office of Enforcement within the Office of Health, Safety and Security has conducted an evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-ORO--ORNL-X10PHYSICS-2008-000 1, Operational Emergency at Building 6000, Holifield Radioactive Ion Beam Facility. Our evaluation included a review of the Oak Ridge National Laboratory (ORNL) Management Investigation Team Report dated November 19, 2008, the associated corrective action plan,

242

Letter from Commonwealth of Virginia to ENSR International Detailing  

Broader source: Energy.gov (indexed) [DOE]

of Virginia to ENSR International of Virginia to ENSR International Detailing Responses to Comments made Concerning the Modified Protocol for Downwash Modeling-Mirant Potomac River, LLC Letter from Commonwealth of Virginia to ENSR International Detailing Responses to Comments made Concerning the Modified Protocol for Downwash Modeling-Mirant Potomac River, LLC Docket No. EO-05-01: Letter from Commonwealth of Virginia to ENSR International Detailing Responses to Comments made Concerning the Modified Protocol for Downwash Modeling-Mirant Potomac River, LLC. The comments are addressed for the most part in this letter. As to the electronic media containing the modeling files, an additional copy will be necessary for the public comment process. Letter from Commonwealth of Virginia to ENSR International Detailing

243

Enfrocement Letter, Battelle Memorial Institute - May 20, 2010 | Department  

Broader source: Energy.gov (indexed) [DOE]

Enfrocement Letter, Battelle Memorial Institute - May 20, 2010 Enfrocement Letter, Battelle Memorial Institute - May 20, 2010 Enfrocement Letter, Battelle Memorial Institute - May 20, 2010 May 20, 2010 Enforcement Letter issued to Battelle Memorial Institute related to an Unintentional Firearm Discharge at the Volpentest HAMMER Training and Education Center at the Hanford Site, The Office of Health, Safety and Security's Office of Enforcement conducted an evaluation of the accidental firearm discharge that occurred in an occupied classroom during training led by Ballelle at the Volpentest HAMMER Training and Education Center (HAMMER) in August 2009. The weapon discharge, which occurred during unsupervised student handling of a handgun, could have resulted in a fatal injury to one of the many students in the classroom. Battelle

244

Letter from Secretary Steven Chu to Energy Department Employees |  

Broader source: Energy.gov (indexed) [DOE]

Letter from Secretary Steven Chu to Energy Department Employees Letter from Secretary Steven Chu to Energy Department Employees Letter from Secretary Steven Chu to Energy Department Employees February 1, 2013 - 11:00am Addthis U.S. Secretary of Energy Steven Chu during an online town hall to discuss President Obama's clean energy and innovation agenda on January 11, 2011. | Photo by Charles Watkins, Contractor, Energy Department U.S. Secretary of Energy Steven Chu during an online town hall to discuss President Obama's clean energy and innovation agenda on January 11, 2011. | Photo by Charles Watkins, Contractor, Energy Department Secretary Chu Secretary Chu Former Secretary of Energy In a letter to Energy Department employees today, Energy Secretary Steven Chu highlighted the tremendous progress of the last four years, and

245

Secretary Chu Letter to Senator Lugar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Secretary Chu Letter to Senator Lugar Secretary Chu Letter to Senator Lugar Secretary Chu Letter to Senator Lugar June 9, 2010 - 12:00am Addthis WASHINGTON - U.S. Energy Secretary Steven Chu sent the following letter to Senator Richard Lugar today regarding Senator Lugar's "Practical Energy and Climate Plan Act of 2010." The text is below: June 9, 2010 The Honorable Richard Lugar United States Senate Washington, DC 20510 Dear Senator Lugar: I welcome your introduction today of the Practical Energy and Climate Plan Act of 2010. In particular, I appreciate your ideas for reducing America's oil dependence - which has taken on greater urgency as a result of the BP oil spill. I also commend your focus on energy efficiency, which as you have noted is the fastest, cheapest route to our energy and climate change

246

Secretary Chu Letter to Senator Lugar | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Secretary Chu Letter to Senator Lugar Secretary Chu Letter to Senator Lugar Secretary Chu Letter to Senator Lugar June 9, 2010 - 12:00am Addthis WASHINGTON - U.S. Energy Secretary Steven Chu sent the following letter to Senator Richard Lugar today regarding Senator Lugar's "Practical Energy and Climate Plan Act of 2010." The text is below: June 9, 2010 The Honorable Richard Lugar United States Senate Washington, DC 20510 Dear Senator Lugar: I welcome your introduction today of the Practical Energy and Climate Plan Act of 2010. In particular, I appreciate your ideas for reducing America's oil dependence - which has taken on greater urgency as a result of the BP oil spill. I also commend your focus on energy efficiency, which as you have noted is the fastest, cheapest route to our energy and climate change

247

Enforcement Letter, Argonne National Laboratory-East - April 23, 1997 |  

Broader source: Energy.gov (indexed) [DOE]

Letter, Argonne National Laboratory-East - April 23, Letter, Argonne National Laboratory-East - April 23, 1997 Enforcement Letter, Argonne National Laboratory-East - April 23, 1997 April 23, 1997 Issued to the University of Chicago related to Radiological Worker Training and Qualification Deficiencies at the Argonne National Laboratory-East This letter refers to the Department of Energy's (DOE) evaluation of Argonne National Laboratory-East's (ANL-E) report of a potential noncompliance with the requirements of 10 CFR 835 (Occupational Radiation Protection). This potential noncompliance, which involved the failure to complete the required radiological worker training or retraining for approximately 30 percent of ANL-E's 797 radiological workers, was identified by ANL-E on December 17, 1996, and reported to DOE on December

248

Letter to DOE General Counsel from Whirlpool Senior Counsel, Re:  

Broader source: Energy.gov (indexed) [DOE]

Letter to DOE General Counsel from Whirlpool Senior Counsel, Re: Letter to DOE General Counsel from Whirlpool Senior Counsel, Re: Implementation of Alternative Test Procedure for Large Capacity Residential Clothes Washers Letter to DOE General Counsel from Whirlpool Senior Counsel, Re: Implementation of Alternative Test Procedure for Large Capacity Residential Clothes Washers Letter to DOE General Counsel from Whirlpool Senior Counsel, Re: Implementation of Alternative Test Procedure for Large Capacity Residential Clothes Washers After granting several waivers establishing an alternative test procedure for residential clothes washers, DOE sought the views of interested parties regarding the proper implementation of these waivers. Whirlpool responded to the DOE's inquiry with a number of comments to recommend a course of

249

Policy Flash 2013-30 Acquisition Letter on Acquisition Planning  

Broader source: Energy.gov (indexed) [DOE]

0 Acquisition Letter on Acquisition Planning 0 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts Attached is Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe.gov. Policy Flash_MO Acq Planning AL.pdf AL_ 2013-03 Acq Planning_MO.pdf More Documents & Publications Attachment FY2011-09(3) Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition Planning in

250

Enforecement Letter, Parsons Infrastructure & Technology Group INC, - July  

Broader source: Energy.gov (indexed) [DOE]

Enforecement Letter, Parsons Infrastructure & Technology Group INC, Enforecement Letter, Parsons Infrastructure & Technology Group INC, - July 13, 2009 Enforecement Letter, Parsons Infrastructure & Technology Group INC, - July 13, 2009 July 13, 2009 Enforcement Letter issued to Parsons Infrastructure & Technology Group, Inc., related to a Form Wood Timber Fire at the Salt Waste Processing Facility at the Savannah River Site The U.S. Department of Energy's (DOE) Office of Enforcement, within the Office of Health, Safety and Security, conducted an evaluation of the deficiencies associated with the January 24, 2009, fire event described in Noncompliance Tracking System (NTS) report NTS-SRSO--PSC-SWPF-2009-0001, Form Wood Timber Fire. The evaluation included a review of documents and discussions with you and members of your staff. Parsons Infrastructure &

251

FAL 2006-04, Financial Assistance Letters Remaining in Effect  

Broader source: Energy.gov (indexed) [DOE]

Financial Assistance Letters (FALs) that remain in effect are identified below. All other previously issued FALs Financial Assistance Letters (FALs) that remain in effect are identified below. All other previously issued FALs have been superseded by a formal rulemaking, incorporated into other guidance, and/or canceled. *************** Financial Assistance Letters Remaining in Effect Number Date Subject 2006-03 05/10/2006 Implementation Guidance for Awarding Technology Investment Agreements Financial Assistance Letters Discontinued Number Date Subject Disposition 2004-03 02/12/2004 Intellectual Property Moved to the Guide to Financial Assistance 2004-06 11/02/2004 Award Terms Moved to the Guide to Financial Assistance 2005-03 06/27/2005 Eligibility Determination Required by Section 2306 of the Energy Policy Act Moved to the Guide to

252

Enfrocement Letter, Battelle Memorial Institute - May 20, 2010 | Department  

Broader source: Energy.gov (indexed) [DOE]

Enfrocement Letter, Battelle Memorial Institute - May 20, 2010 Enfrocement Letter, Battelle Memorial Institute - May 20, 2010 Enfrocement Letter, Battelle Memorial Institute - May 20, 2010 May 20, 2010 Enforcement Letter issued to Battelle Memorial Institute related to an Unintentional Firearm Discharge at the Volpentest HAMMER Training and Education Center at the Hanford Site, The Office of Health, Safety and Security's Office of Enforcement conducted an evaluation of the accidental firearm discharge that occurred in an occupied classroom during training led by Ballelle at the Volpentest HAMMER Training and Education Center (HAMMER) in August 2009. The weapon discharge, which occurred during unsupervised student handling of a handgun, could have resulted in a fatal injury to one of the many students in the classroom. Battelle

253

Diversity Action Letter from Secretary Chu | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Diversity Action Letter from Secretary Chu Diversity Action Letter from Secretary Chu Diversity Action Letter from Secretary Chu In July 2011, the Office of Diversity Programs concluded a comprehensive review of DOE's workforce diversity and inclusion policies and programs. The findings from this analysis, which have been shared with DOE senior management, indicate that we can do more to create a culture that values diversity, which in turn will make the Department an employer of choice and enhance our mission effectiveness. Read more about these efforts here. This letter from Secretary Chu directs Associate Deputy Secretary Mel Williams to take action on the following issues: Dialogue and Feedback Recruitment and Hiring Retention, Development, and Promotions Commitment and Understanding Performance and Accountability

254

Enforcement Letter, Bechtel Nevada - February 26, 2003 | Department of  

Broader source: Energy.gov (indexed) [DOE]

February 26, 2003 February 26, 2003 Enforcement Letter, Bechtel Nevada - February 26, 2003 February 26, 2003 Enforcement Letter issued to Bechtel Nevada related to Authorization Basis Noncompliances at the Nevada Test Site This letter refers to the Department of Energy's (DOE's) review of the facts and circumstances related to certain nuclear safety noncompliances during 2002 at the Nevada Test Site. These noncompliances were identified in the process of conducting a limited Price-Anderson Amendments Act (PAAA) Program Review of Bechtel Nevada during November 14-15, 2002, by DOE's Office of Price-Anderson Enforcement (OE), in coordination with DOE's National Nuclear Security Administration Nevada Site Office (NNSA/NSO). These matters are being called to your attention through this Enforcement Letter since these noncompliances had not been

255

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER  

Broader source: Energy.gov (indexed) [DOE]

CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT This Fiscal Year 2008 Civilian Radioactive Waste Management Fee Adequacy Letter Report presents an evaluation of the adequacy of the one mill per kilowatt-hour fee paid by commercial nuclear power generators for the permanent disposal of their spent nuclear fuel by the Government. This evaluation recommends no fee change. CIVILIAN RADIOACTIVE WASTE MANAGEMENT 2008 FEE ADEQUACY ASSESSMENT LETTER REPORT More Documents & Publications FY 2007 Fee Adequacy, Pub 2008 Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report January 16, 2013 Secretarial Determination of the Adequacy of the Nuclear

256

Enforcement Letter, CH2M Hill Hanford Group Inc, - September...  

Office of Environmental Management (EM)

CH2M Hill Hanford Group Inc, - September 6, 2007 Enforcement Letter, CH2M Hill Hanford Group Inc, - September 6, 2007 September 6, 2007 Issued to CH2M Hill Hanford Group, Inc.,...

257

Enforcement Letter, Oak Ridge National Laboratory - May 31, 2002...  

Broader source: Energy.gov (indexed) [DOE]

- May 31, 2002 Enforcement Letter, Oak Ridge National Laboratory - May 31, 2002 May 31, 2002 Issued to UT-Battelle, LLC related to Unplanned Radiation Exposures at Oak Ridge...

258

Enforcement Letter, WEL-2014-01 - April 10, 2014 | Department...  

Office of Environmental Management (EM)

4-01 - April 10, 2014 Enforcement Letter, WEL-2014-01 - April 10, 2014 April 10, 2014 Issued to Savannah River Remediation, LLC related to an employee shoulder injury sustained...

259

Enforcement Letter, NEL-2014-01 - April 25, 2014 | Department...  

Energy Savers [EERE]

NEL-2014-01 - April 25, 2014 Enforcement Letter, NEL-2014-01 - April 25, 2014 April 25, 2014 Issued to CH2M HILL Plateau Remediation Company relating to the discovery of a sealed...

260

Enforcement Letter, WEL-2014-02 - April 17, 2014 | Department...  

Office of Environmental Management (EM)

WEL-2014-02 - April 17, 2014 Enforcement Letter, WEL-2014-02 - April 17, 2014 April 17, 2014 Issued to B&W Pantex, LLC, related to six events involving improper management,...

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Re-Engineering Letter-to-Sound Rules Martin Jansche  

E-Print Network [OSTI]

Re-Engineering Letter-to-Sound Rules Martin Jansche The Ohio State University Columbus, OH 43210, U.S.A. jansche.1@osu.edu Abstract Using finite-state automata for the text analysis component in a text

Toronto, University of

262

Enforcement Letter, On Computer Services, LLC - WEL-2012-03 ...  

Broader source: Energy.gov (indexed) [DOE]

On Computer Services, LLC - WEL-2012-03 Enforcement Letter, On Computer Services, LLC - WEL-2012-03 October 23, 2012 Issued to On Computer Services, LLC, related to an Employee...

263

Life & Letters Volume 5, Issue 1 Winter 2006 SUICIDE TERRORISM  

E-Print Network [OSTI]

Life & Letters Volume 5, Issue 1 · Winter 2006 · SUICIDE TERRORISM · THE COST OF EMOTIONAL CONTROL Liberal Arts Career Services office, Dr. Ami Pedahzur's work on suicide terrorism, Dr. Joe Potter's work

Pillow, Jonathan

264

Enforcement Letter, CH2M Hill - October 4, 2004 | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Process Research Unit On October 4, 2004, the U.S. Department of Energy (DOE) issued a nuclear safety Enforcement Letter to CH2M Hill concerning expiration of the company's...

265

SAMPLE COVER LETTER for BIOTECH INTERNSHIP Aaron Smith  

E-Print Network [OSTI]

SAMPLE COVER LETTER for BIOTECH INTERNSHIP Aaron Smith 12 Echo Street Cambridge, MA 55555 September this opportunity. Please feel free to contact me I can provide any additional information. Sincerely, Aaron Smith

Fraden, Seth

266

Microsoft Word - Redline_AttachmentP_AnnouncementLetter_012313...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 23, 2013 In reply refer to: SR-7 Dear Interested Parties, This letter is to inform you of the Bonneville Power Administration's response to the Federal Energy Regulatory...

267

Enforcement Letter, NEL-2011-03 - October 24, 2011 | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

an Enforcement Letter to EnergySolutions, LLC related to a radiological event caused by pumps that leaked contaminated sludge inside the H2 Tank Farm Weather Enclosure at DOE's...

268

Enforcement Letter, WEL-2012-05 - December 20, 2012 | Department...  

Office of Environmental Management (EM)

2012 Enforcement Letter, WEL-2012-05 - December 20, 2012 December 20, 2012 Issued to Alliance for Sustainable Energy, LLC, related to an Electrical Shock Near Miss Incident that...

269

Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial Assistance Letter 2013-03 Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial Assistance Letter 2013-03 Questions concerning this policy flash should be directed to Barbara Binney of the Contract and Financial Assistance Policy Division, at Barbara Binney@hq.doe.gov or at (202) 287-1340 Policy Flash 2013-51.pdf Policy Flash 2013- Attachment AL 2013-05 FAL 2013-03 April 24 2013 final.pdf Attachment 1 DOE Section 311 Contract Award letter FY2013 April 26.pdf Attachment 2A DOE Section 311 Financial Assistance Letter FY2013 April 26.pdf Attachment 2B DOE Section 311 Financial Assistance Letter FY2013 April 26.pdf More Documents & Publications Policy Flash 2014-04 Continuing Appropriations Act, 2014 -- Congressional

270

Inspection Letter Report: INS-L-09-02 | Department of Energy  

Energy Savers [EERE]

Report: INS-L-09-02 January 30, 2009 Letter Report on Questionable Purchases at the Hanford Site This letter report provides the results of an Office of Inspector General...

271

Audit Letter Report: OAS-L-09-15 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Audit Letter Report: OAS-L-09-15 July 24, 2009 Audit of Bonneville Power Administration Fish Hatchery Projects Topic: Management and Administration Audit Letter Report: OAS-L-09-15...

272

2014-02 Acquistion Letter 2014-01: Management and Operating Contractor...  

Broader source: Energy.gov (indexed) [DOE]

2014-02 Acquistion Letter 2014-01: Management and Operating Contractors' Audit Coverage of Cost-Reimbursement Subcontracts 2014-02 Acquistion Letter 2014-01: Management and...

273

Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL...  

Energy Savers [EERE]

4-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Questions concerning this policy flash...

274

Response by PJM to letters from the City of Alexandria and the...  

Broader source: Energy.gov (indexed) [DOE]

by PJM to letters from the City of Alexandria and the Virginia Department of Environmental Quality pursuant to Order No. 202-05-03 Response by PJM to letters from the City of...

275

EERE-2010-BT-STD-0027 Ex Parte Letter NEMA Motor Training re...  

Broader source: Energy.gov (indexed) [DOE]

0-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors Rule 15 July 2013. EERE-2010-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors Rule 15 July 2013. This...

276

Audit Letter Report: OAS-L-07-06 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6 Audit Letter Report: OAS-L-07-06 January 21, 2007 Office of Science's Implementation of the Federal Information Security Management Act Audit Letter Report: OAS-L-12-06 More...

277

Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department...  

Broader source: Energy.gov (indexed) [DOE]

Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order...

278

Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site  

SciTech Connect (OSTI)

This letter serves as the post-closure inspection letter report for corrective action units on the Nevada National Security Site for calendar year 2011. Copies of completed inspection checklists are included in this report.

NSTec Environmental Restoration

2011-05-26T23:59:59.000Z

279

Audit Letter Report: OAS-L-07-23 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Audit Letter Report: OAS-L-07-23 September 18, 2007 The Federal Energy Regulatory Commission's Cyber Security Program-2007 Audit Letter Report: OAS-L-07-23 More Documents &...

280

Microsoft Word - AL 2010-07 Acquistion Letters Remaining in Effect...  

Office of Environmental Management (EM)

AL 2010-07 Acquistion Letters Remaining in Effect May 2010 revision 1 June 2010 Microsoft Word - AL 2010-07 Acquistion Letters Remaining in Effect May 2010 revision 1 June 2010...

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Letter from the AMO Director on the AMO Peer Review, May 6-7...  

Broader source: Energy.gov (indexed) [DOE]

Letter from the AMO Director on the AMO Peer Review, May 6-7, 2014 Letter from the AMO Director on the AMO Peer Review, May 6-7, 2014 Dear Stakeholders, In May 2014, the Advanced...

282

CAREER PLANS RESUMES COVER LETTERS JOB SEARCH STRATEGIES PORTFOLIOS TIPS The 2010-2011  

E-Print Network [OSTI]

CAREER PLANS · RESUMES · COVER LETTERS · JOB SEARCH STRATEGIES · PORTFOLIOS · TIPS The 2010 Strategies .......................................... 16 · Resume Preparation............................................ 17 · Sample Resumes ................................................ 18 · Cover Letters

Kaminsky, Werner

283

Secretary Chu Letter to 2nd US-China EE Forum  

Office of Energy Efficiency and Renewable Energy (EERE)

English and Chinese translation of Secretary Chu's letter to participants in the 2nd US-China EE Forum.

284

Joint Hydraulic Institute/ASAP Letter of March 30th- Clarification of Point #2  

Broader source: Energy.gov [DOE]

We would like to clarify point #2 in the referenced letter, which addressed potential energy conservation standards for residential circulators.

285

Resource Letter NMR-EPR-1 on Nuclear Magnetic Resonance and Electron Paramagnetic Resonance  

Science Journals Connector (OSTI)

Prepared at the request of the AAPT Committee on Resource Letters; supported by a grant from the National Science Foundation.

R. E. Norberg

1965-01-01T23:59:59.000Z

286

Letter to Chairman Darrell Issa from Eric Fygi, Deputy General Counsel-- July 24, 2013  

Broader source: Energy.gov [DOE]

On July 24, 2013, Energy Department Deputy General Counsel Eric Fygi sent this letter to Chairman Darrell Issa.

287

Establishing Site X: Letter, Arthur H. Compton to Enrico Fermi, September 14, 1942  

DOE R&D Accomplishments [OSTI]

This letter from Compton to Fermi describes developments bearing on the establishment of site X (which, as of the letter date, is definitely determined as at the Tennessee Valley) for the construction of a pile and associated pilot plant buildings, describes the situation as of the letter date, and offers counsel as to how to proceed.

Compton, A. H.

1942-09-00T23:59:59.000Z

288

Lehigh University Career Services Grad Student Resume/Cover letter Handbook Graduate Student  

E-Print Network [OSTI]

1 Lehigh University Career Services ­ Grad Student Resume/Cover letter Handbook Graduate Student Resume and Cover Letter Handbook Lehigh University Career Services Department Rauch Business Center University Career Services ­ Grad Student Resume/Cover letter Handbook Graduate Student Resumes Resumes

Napier, Terrence

289

Enforcement Letter, WEL-2010-02 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

WEL-2010-02 WEL-2010-02 Enforcement Letter, WEL-2010-02 December 23, 2010 Enforcement Letter issued to National Security Technologies, LLC related to a flash fire event at the Nevada National Security Site The Office of Enforcement reviewed the NSTec fire investigation report, management review report, root cause analysis (RCA), and corrective action plan; the Martin-Harris Construction Environmental, Safety and Health Plan; and the construction subcontract and accompanying exhibits. The Office of Enforcement also obtained and reviewed a number of core company directives, assessments, and inspection documents identified in exhibit E of the subcontract. Enforcement Letter, WEL-2010-02 More Documents & Publications Independent Oversight Review, Nevada National Security - May 2013

290

Investigation Letter Report: I11IG002 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Letter Report: I11IG002 Letter Report: I11IG002 Investigation Letter Report: I11IG002 August 17, 2011 Impact of Copper Thefts on the Department of Energy A series of news articles during the last several months have reported increased thefts of copper nationally, including several that have interrupted electrical distribution and telephone service in communities across the country. The Department of Energy's laboratories, environmental remediation sites, generating stations and other facilities have not been immune to this problem. Over the last few years, the Office of Inspector General (OIG) has successfully investigated numerous reports of copper thefts from Department sites nationwide. The OIG believes that there are several practical, cost-effective steps that the Department can

291

Enforcement Letter, Bechtel Nevada - April 1, 2002 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Nevada - April 1, 2002 Nevada - April 1, 2002 Enforcement Letter, Bechtel Nevada - April 1, 2002 April 1, 2002 Enforcement Letter issued to Bechtel Nevada related to Noncompliances with Occupational Radiation Protection and Quality Assurance Requirements at the Nevada Test Site This letter refers to the Department of Energy's (DOE) evaluation of Bechtel Nevada's (BN) report of noncompliances with the occupational radiation protection and quality assurance provisions of DOE's nuclear safety requirements occurring at the Nevada Test Site Reactor-Maintenance, Assembly and Disassembly (R-MAD) facility. The issues involved several failures to follow BN's established work controls and resulted in the uncontrolled breech of a posted radiological area boundary for a hot cell undergoing decommissioning. This was reported by your staff into the

292

Enforcement Letter; Quality Assurance Deficiencies Related to Weapon Activities  

Broader source: Energy.gov (indexed) [DOE]

2, 2005 2, 2005 Dr. Michael R. Anastasio Director Lawrence Livermore National Laboratory P.O. Box 808, L-001 Livermore, CA 94550 Subject: Enforcement Letter - Quality Assurance Deficiencies Related to Weapon Activities Dear Dr. Anastasio: This letter is to inform you of the Department of Energy's (DOE) concern regarding several quality assurance-related deficiencies involving actions by Lawrence Livermore National Laboratory (LLNL) personnel. These deficiencies were associated with a cracked explosive event that occurred at the Pantex site in January 2004. The timing of this letter is intended to coincide with a DOE enforcement action stemming from this event. During the dismantlement of a retired nuclear weapon, for which LLNL was the design

293

Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004 |  

Broader source: Energy.gov (indexed) [DOE]

Diversified Metal Products, Inc - October 28, Diversified Metal Products, Inc - October 28, 2004 Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004 October 28, 2004 Issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant This letter addresses deficiencies associated with the fabrication of four transportainers delivered under contract to Washington TRU Solutions LLC (WTS) in support of their Characterization and Repackaging Modular Unit development. The Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) has reviewed your performance in delivering these transportainers and is concerned with the quality assurance aspects of your work activities in fabricating the transportainers. Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004

294

Enforcement Letter, Los Alamos National Security - February 16, 2007 |  

Broader source: Energy.gov (indexed) [DOE]

- February 16, - February 16, 2007 Enforcement Letter, Los Alamos National Security - February 16, 2007 February 16, 2007 Letter to Los Alamos National Security, LLC regarding the Preliminary Notice of Violation issued to the University of California related to Operational Performance at the Los Alamos National Laboratory Today the enclosed Preliminary Notice of Violation (PNOV) was issued to the University of California related to operational performance deficiencies at the Los Alamos National Laboratory (LANL). Although civil penalties associated with the prior contract were waived by statute, the proposed penalty would have equaled $1.1 million dollars. Enforcement Letter, Los Alamos National Security-February 16, 2007 More Documents & Publications Preliminary Notice of Violation, Los Alamos National Laboratory -

295

Enforcement Letter, LANL - October 9, 2001 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 9, 2001 October 9, 2001 Enforcement Letter, LANL - October 9, 2001 October 9, 2001 Enforcement Letter issued to Los Alamos National Laboratory related to Quality Assurance Provisions at the Los Alamos Critical Experiments Facility This letter refers to the Department of Energy's (DOE) evaluation of Los Alamos National Laboratory's (LANL) report of noncompliances with quality assuranceprovisions of DOE's nuclear safety requirements occurring at Los Alamos Critical Experiments Facility (LACEF) TA-18. These issues involved violations of theestablished LACEF Technical Safety Requirements (TSR) and were reported into the Noncompliance Tracking System (NTS) by your staff (NTS-ALO-LA-LANL-TA18-2000-0001) on February 25, 2000. These noncompliances were a part of the enforcement action issued by DOE to LANL in December

296

Enforcement Letter, Lawrence Berkeley National Laboratory - July 21, 1998 |  

Broader source: Energy.gov (indexed) [DOE]

July July 21, 1998 Enforcement Letter, Lawrence Berkeley National Laboratory - July 21, 1998 July 21, 1998 Issued to the University of California related to Radiological Work Controls at the Lawrence Berkeley National Laboratory This letter refers to the Department of Energy's (DOE) evaluation of Lawrence Berkeley National Laboratory's (LBNL) report of potential noncompliances with the requirements of 10 CFR 835 (Occupational Radiation Protection). The noncompliances involved the repeated failure of a laboratory researcher during 1996 - 1997 to adhere to LBNL's work authorization process and radiological work controls during research activities with a radioactive isotope, [ ]. On May 27, 1998, the Office of Enforcement and Investigation (EH-10) issued a letter to you, requesting information regarding this noncompliance

297

Enforcement Letter, Bechtel National Inc - March 25, 2004 | Department of  

Broader source: Energy.gov (indexed) [DOE]

National Inc - March 25, 2004 National Inc - March 25, 2004 Enforcement Letter, Bechtel National Inc - March 25, 2004 March 25, 2004 Enforcement Letter issued to Bechtel National, Inc., related to Concrete Work Issues at the Waste Treatment and Immobilization Plant at the Hanford Site This letter addresses eleven instances that have occurred at the Waste Treatment Plant during a 14-month period form August 2002 through October 2003 in which concrete work was not performed to established procedures and standards. The Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) has reviewed these inspect concrete work prior to pour. In addition, OE is concerned with your failure to correct these known problems in a timely manner. It is our expectation that Bechtel National Inc. (BNI) has quality improvement programs in place to prevent recurrence

298

Enforcement Letter, Argonne National Laboratory-West - February 9, 1999 |  

Broader source: Energy.gov (indexed) [DOE]

Argonne National Laboratory-West - February 9, Argonne National Laboratory-West - February 9, 1999 Enforcement Letter, Argonne National Laboratory-West - February 9, 1999 February 9, 1999 Enforcement Letter issued to Argonne National Laboratory related to a Dropped Fuel Basket Assembly and Radiation Protection Program Deficiencies at Argonne National Laboratory-West This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning two incidents occurring in June and August 1998 at Argonne National Laboratory - West's (ANLW) Fuel Conditioning Facility (FCF): dropping a fuel basket assembly containing chopped fuel elements and repair of a manipulator seal tube. During November 2-3, 1998, DOE conducted an investigation to determine what, if any, noncompliances with applicable nuclear safety regulations may have

299

Enforcement Letter, Intennech, Inc. - March 26, 2010 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Intennech, Inc. - March 26, 2010 Intennech, Inc. - March 26, 2010 Enforcement Letter, Intennech, Inc. - March 26, 2010 March 26, 2010 Enforcement Letter issued to Intermech, Inc. related to Installation and Inspection of Anchor Bolts and Pipe Supports at the DUF6 Conversion Buildings at the Portsmouth and Paducah Gaseous Diffusion Plants This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances associated with deficiencies in the installation and inspection of anchor bolts and pipe supports at the DUF6 Conversion Buildings, located at the Portsmouth and Paducah Gaseous Diffusion Plants. The investigation report, dated April 23, 2009, was provided under separate cover. Potential violations of 10 C.F.R. Part 830, Nuclear Safety Management,

300

Enforcement Letter, BNFL Inc - July 10, 2003 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

BNFL Inc - July 10, 2003 BNFL Inc - July 10, 2003 Enforcement Letter, BNFL Inc - July 10, 2003 July 10, 2003 Enforcement Letter issued to BNFL, Inc. related to potential violations of Quality Assurance Requirements at the East Tennessee Technology Park This letter refers to the Department of Energy's (DOE) review of the facts and circumstances related to several Price-Anderson noncompliances, which are documented in the following Noncompliance Tracking System (NTS) reports NTS-ORO--BNFL-K33-2003-0001, "Weaknesses in BNFL's Issue Screening Process to Determine PAAA Noncompliance." This report documents that the BNFL PAAA Review Board failed to correctly identify and report the vast majority of reportable noncompliances NTS-ORO--BNFL-K33-2003-0002, "Weaknesses in the Management

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Enforcement Letter, Geiger Brothers Mechanical Contractors, INC - March 26,  

Broader source: Energy.gov (indexed) [DOE]

Geiger Brothers Mechanical Contractors, INC - Geiger Brothers Mechanical Contractors, INC - March 26, 2010 Enforcement Letter, Geiger Brothers Mechanical Contractors, INC - March 26, 2010 March 26, 2010 Enforcement Letter issued to Geiger Brothers Mechanical Contractors, Inc. related to Installation and Inspection of Penetration Fire Seals at the DUF6 Conversion Building at the Portsmouth Gaseous Diffusion Plant This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances associated with deficiencies in the installation and inspection of penetration fire seals at the DUF6 Conversion Building, located at the Portsmouth Gaseous Diffusion Plant. DOE's investigation report, dated January 22, 2009, was provided to Geiger Brothers Mechanical Contractors, Inc. (Geiger) under

302

Enforcement Letter, Washington TRU Solutions - September 8, 2006 |  

Broader source: Energy.gov (indexed) [DOE]

Washington TRU Solutions - September 8, 2006 Washington TRU Solutions - September 8, 2006 Enforcement Letter, Washington TRU Solutions - September 8, 2006 September 8, 2006 Enforcement Letter issued to Washington TRU Solutions, LLC related to Quality Assurance Deficiencies associated with the Super High-Efficiency Neutron Counter Non-Destructive Assay System Refurbishment at the Waste Isolation Pilot Plant The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-CBFO-WIPP-WIPP-2006-0001. Our evaluation included review of the investigation/causal analysis and discussion with you and other site personnel during an informal conference held on August 1, 2006. Enforcement Letter, Washington TRU Solutions -September 8, 2006

303

Enforcement Letter, LANL - July 7, 2003 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 7, 2003 July 7, 2003 Enforcement Letter, LANL - July 7, 2003 July 7, 2003 Enforcement Letter issued to Los Alamos National Laboratory related to Negative Performance Trends The Office of Price-Anderson Enforcement (OE) is concerned that nuclear safety at the Los Alamos National Laboratory (LANL/Laboratory) continues to demonstrate a negative performance trend. Our observations are based on numerous recent events involving both nuclear safety and radiological control issues. Since our last discussions at the March 2003 LANL Price-Anderson Amendments Act Enforcement Conference, my office has reviewed numerous nuclear safety and radiological events as part of enforcement action follow-up and monitoring. Enforcement Letter, LANL - July 7, 2003 More Documents & Publications

304

Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004 |  

Broader source: Energy.gov (indexed) [DOE]

Diversified Metal Products, Inc - October 28, Diversified Metal Products, Inc - October 28, 2004 Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004 October 28, 2004 Issued to Diversified Metal Products, Inc. related to Transportainer Fabrication Deficiencies for the Waste Isolation Pilot Plant This letter addresses deficiencies associated with the fabrication of four transportainers delivered under contract to Washington TRU Solutions LLC (WTS) in support of their Characterization and Repackaging Modular Unit development. The Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) has reviewed your performance in delivering these transportainers and is concerned with the quality assurance aspects of your work activities in fabricating the transportainers. Enforcement Letter, Diversified Metal Products, Inc - October 28, 2004

305

Enforcement Letter, Argonne National Laboratory-West - February 9, 1999 |  

Broader source: Energy.gov (indexed) [DOE]

West - February 9, West - February 9, 1999 Enforcement Letter, Argonne National Laboratory-West - February 9, 1999 February 9, 1999 Enforcement Letter issued to Argonne National Laboratory related to a Dropped Fuel Basket Assembly and Radiation Protection Program Deficiencies at Argonne National Laboratory-West This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning two incidents occurring in June and August 1998 at Argonne National Laboratory - West's (ANLW) Fuel Conditioning Facility (FCF): dropping a fuel basket assembly containing chopped fuel elements and repair of a manipulator seal tube. During November 2-3, 1998, DOE conducted an investigation to determine what, if any, noncompliances with applicable nuclear safety regulations may have

306

Enforcement Letter, Sandia National Laboratories - February 27, 1998 |  

Broader source: Energy.gov (indexed) [DOE]

National Laboratories - February 27, National Laboratories - February 27, 1998 Enforcement Letter, Sandia National Laboratories - February 27, 1998 February 27, 1998 Issued to Sandia Corporation related to Work Control Deficiencies associated with operating Radiation Generating Devices at Sandia National Laboratories. This letter refers to the Department of Energy's (DOE's) evaluation of Sandia National Laboratories' (SNL's) report of potential noncompliances with the requirements of 10 CFR 835 (Occupational Radiation Protection). The noncompliances, which involved operational and work control deficiencies related to the use of three radiation generating devices (RGDs), were identified on October 1, 1997, and reported to DOE on October 21, 1997, in the Noncompliance Tracking System (NTS). Enforcement Letter, Sandia National Laboratories - February 27, 1998

307

Enforcement Letter, Bechtel National Inc - March 25, 2004 | Department of  

Broader source: Energy.gov (indexed) [DOE]

National Inc - March 25, 2004 National Inc - March 25, 2004 Enforcement Letter, Bechtel National Inc - March 25, 2004 March 25, 2004 Enforcement Letter issued to Bechtel National, Inc., related to Concrete Work Issues at the Waste Treatment and Immobilization Plant at the Hanford Site This letter addresses eleven instances that have occurred at the Waste Treatment Plant during a 14-month period form August 2002 through October 2003 in which concrete work was not performed to established procedures and standards. The Department of Energy's (DOE) Office of Price-Anderson Enforcement (OE) has reviewed these inspect concrete work prior to pour. In addition, OE is concerned with your failure to correct these known problems in a timely manner. It is our expectation that Bechtel National Inc. (BNI) has quality improvement programs in place to prevent recurrence

308

Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Response from the Plumbing Manufacturers Institute (PMI), Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads Letter Response from the Plumbing Manufacturers Institute (PMI), Docket No. EERE-2010-BT-NOA-0016 - Notice of Availability of Interpretive Rule on the Applicability of Current Water Conservation Standards for Showerheads. This is the cover letter to additional comments submitted by PMI after alerting the DOE to its belief that the Interpretive Rule should be subject

309

Enforcement Letter, Argonne National Laboratory-East - February 24, 2000 |  

Broader source: Energy.gov (indexed) [DOE]

February 24, February 24, 2000 Enforcement Letter, Argonne National Laboratory-East - February 24, 2000 February 24, 2000 Enforcement Letter issued to Argonne National Laboratory related to Bioassay Program Deficiencies at Argonne National Laboratory-East, February 24, 2000 This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the above referenced Noncompliance Tracking System(NTS) report describing bioassay program deficiencies at Argonne National Laboratory-East (ANL-E). This report was submitted to DOE on December 23, 1999. Approximately thirteen months previous to this NTS report's submittal, DOE's Office of Enforcement and Investigation (EH-Enforcement) issued to all DOE and contractor Price-Anderson Amendments Act coordinators a

310

Enforcement Letter, Amer Industrial Technologies - April 13, 2010 |  

Broader source: Energy.gov (indexed) [DOE]

Amer Industrial Technologies - April 13, 2010 Amer Industrial Technologies - April 13, 2010 Enforcement Letter, Amer Industrial Technologies - April 13, 2010 April 13, 2010 Enforcement Letter issued to Amer Industrial Technologies related to Weld Deficiencies at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 This letter refers to the Office of Health, Safety and Security's Office of Enforcement's investigation into the facts and circumstances associated with quality assurance deficiencies in safety significant drain pipe fabricated by Amer Industrial Technologies, Inc. (AIT) as a supplier to Parsons Infrastructure & Technology Group, Inc. (Parsons) for the Salt Waste Processing Facility (SWPF) construction project at the Department of Energy (DOE) Savanuah River Site. The contract between Parsons and AIT was

311

Enforcement Letter, WEL-2013-02 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Letter, WEL-2013-02 Enforcement Letter, WEL-2013-02 Enforcement Letter, WEL-2013-02 July 30, 2013 Issued to Wastren Advantage, Inc. related to the Loss of Supplied Breathing Air in the Box Breakdown Area of the Transuranic Waste Processing Center located in Oak Ridge, Tennessee The U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated the facts and circumstances surrounding a loss of breathing air within the Box Breakdown Area (BBA) of the Transuranic Waste Processing Center (TWPC), which led to the expedited egress of two workers in supplied-air suits and one worker in a supplied-air hood. Wastren Advantage, Inc. (WAI) manages and operates the TWPC, located in Oak Ridge, Tennessee, under a contract with DOE and is

312

Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4,  

Broader source: Energy.gov (indexed) [DOE]

Idaho Technologies Company - Idaho Technologies Company - August 4, 1998 Enforcement Letter, Lockheed Martin Idaho Technologies Company - August 4, 1998 August 4, 1998 Issued to Lockheed Martin Idaho Technologies Company related to a Repetitive Problem with Instrument Operability at the Idaho National Engineering and Environmental Laboratory This letter refers to the Department of Energy's (DOE) evaluation of the Lockheed Martin Idaho Technologies Company (LMITCO) subject Noncompliance Tracking System (NTS) report for noncompliances with the requirements of 10 CFR 830.120, "Quality Assurance Requirements." The NTS report addresses a repetitive problem of maintaining the operability of radiation monitoring instrumentation and systems referenced in nuclear facilities authorization

313

Enforcement Letter, Lawrence Livermore National Laboratory - November 5,  

Broader source: Energy.gov (indexed) [DOE]

November 5, 1999 Enforcement Letter, Lawrence Livermore National Laboratory - November 5, 1999 November 5, 1999 Issued to Lawrence Livermore National Laboratory related to Authorization Basis Issues This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning issues related to the maintenance and adherence to documents which form the authorization basis for Lawrence Livermore National Laboratory (LLNL) operated nuclear facilities. Specifically, three Noncompliance Tracking System (NTS) reports were submitted over a four-day period and are summarized below: On July 30, 1999, it was reported that two cabinets contained about [specified amount] of [ ] solvents in violation of the building Safety Analysis Documentation;

314

Plant Award Application Letter | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Application Letter Application Letter Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder Technical documentation

315

Enforcement Letter, Lawrence Livermore National Laboratory - November 5,  

Broader source: Energy.gov (indexed) [DOE]

November 5, 1999 Enforcement Letter, Lawrence Livermore National Laboratory - November 5, 1999 November 5, 1999 Issued to Lawrence Livermore National Laboratory related to Authorization Basis Issues This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning issues related to the maintenance and adherence to documents which form the authorization basis for Lawrence Livermore National Laboratory (LLNL) operated nuclear facilities. Specifically, three Noncompliance Tracking System (NTS) reports were submitted over a four-day period and are summarized below: On July 30, 1999, it was reported that two cabinets contained about [specified amount] of [ ] solvents in violation of the building Safety Analysis Documentation;

316

Enforcement Letter, Lawrence Livermore National Laboratory - August 22,  

Broader source: Energy.gov (indexed) [DOE]

August August 22, 1996 Enforcement Letter, Lawrence Livermore National Laboratory - August 22, 1996 August 22, 1996 Issued to the University of California related to Radiological Worker Training Deficiencies at the Lawrence Livermore National Laboratory This letter refers to the Department of Energy's (DOE) evaluation of Lawrence Livermore National Laboratory's (LLNL) report of a potential noncompliance with the requirements of 10 CFR 835 (Occupational Radiation Protection). This potential noncompliance involved the failure to complete required radiological worker retraining for 49 percent of LLNL's approximately 700 radiological workers. The training issue was initially identified on May 6, 1996, by LLNL during a routine review of the Chemistry and Materials Science deficiency

317

Enforcement Letter, Westinghouse Hanford Corporation - September 22, 1995 |  

Broader source: Energy.gov (indexed) [DOE]

Hanford Corporation - September Hanford Corporation - September 22, 1995 Enforcement Letter, Westinghouse Hanford Corporation - September 22, 1995 September 22, 1995 Issued to Westinghouse Hanford Corporation related to Operational Safety Requirements Implementation at the B Plant/Waste Encapsulation and Storage Facility at the Hanford Site This letter refers to the Department of Energy's (DOE) evaluation of Westinghouse Hanford Company's (WHC) report of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Requirements) at the Hanford B Plant/Waste Encapsulation Facility (WESF). These potential noncompliances were identified by WHC on May 8, 1995, during a self-initiated comprehensive assessment of the facilities Operational Safety Requirements (OSR) program

318

Categorical Exclusion Determinations: B1.11 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

B1.11 B1.11 Categorical Exclusion Determinations: B1.11 Existing Regulations B1.11: Fencing Installation of fencing, including, but not limited to border marking, that would not have the potential to significantly impede wildlife population movement (including migration) or surface water flow. Previous Regulations Categorical Exclusion Determinations dated before November 14th, 2011 were issued under previous DOE NEPA regulations. See the Notice of Final Rulemaking (76 FR 63763, 10/13/2011) for information changes to this categorical exclusion. DOCUMENTS AVAILABLE FOR DOWNLOAD August 29, 2011 CX-006588: Categorical Exclusion Determination Routine Monitoring and Maintenance, Slick Rock, Colorado, Disposal/Processing Site CX(s) Applied: B1.3, B1.11, B3.8 Date: 08/29/2011

319

Page not found | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

91 - 13400 of 28,560 results. 91 - 13400 of 28,560 results. Download CX-005884: Categorical Exclusion Determination Routine Monitoring, Maintenance, General Site, and Administrative Actions at the Tuba City, Arizona, Site CX(s) Applied: B1.3, B1.11, B3.1 Date: 05/05/2011 Location(s): Tuba City, Arizona Office(s): Legacy Management http://energy.gov/nepa/downloads/cx-005884-categorical-exclusion-determination Download CX-005682: Categorical Exclusion Determination Routine Monitoring, Maintenance, Research, General Site, and Administrative Actions at the Shiprock, New Mexico, Disposal Site CX(s) Applied: A1, A8, B1.3, B1.11, B1.20, B3.1 Date: 04/14/2011 Location(s): Shiprock, New Mexico Office(s): Legacy Management http://energy.gov/nepa/downloads/cx-005682-categorical-exclusion-determination

320

Comparison of the (22) reconstructions of GaAs{111} surfaces  

Science Journals Connector (OSTI)

The {111} surfaces of GaAs have been examined using scanning tunneling microscopy and soft x-ray photoelectron spectroscopy and a comparison has been made between the three different (22) reconstructions observed. We find that both the (111)A and (111)B surfaces initially exhibit (22) ordered adstructures following the thermal desorption of an As cap, though spectroscopy shows them to be chemically inequivalent. With increasing temperature, the (111)A surface is found to develop into a Ga-vacancy (22) structure, in many ways similar to a (110) surface. The GaAs(111)B surface, however, loses its (22) periodicity with increasing annealing temperature, following a sequence of less As-rich structures.

J. M. C. Thornton; P. Weightman; D. A. Woolf; C. J. Dunscombe

1995-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

The Career Center 29 You should always include a cover letter when mailing, e-mailing, or faxing a resume.  

E-Print Network [OSTI]

a resume. A cover letter serves two basic purposes: as an introduction and as a marketing tool. Your cover letter for each resume you mail. Generic cover letters look like just that (what do you do with mail printing hard copies, use good quality paper. The paper should match that of your resume. A cover letter

Kasman, Alex

322

Resource Letter: OTS-1: Observations and theory of supernovae  

Science Journals Connector (OSTI)

This Resource Letter provides a guide to the literature on the observations of supernovae and the theory of their explosion mechanisms. Journal articles and books are cited for the following topics: observations of the spectra spectropolarimetry and light curves of supernovae of various types theory of thermonuclear explosions core collapse and radioactive decay applications to cosmology and possible connections to gamma-ray bursts.

J. Craig Wheeler

2003-01-01T23:59:59.000Z

323

Surface Science Letters Structures of adsorbed water layers  

E-Print Network [OSTI]

Surface Science Letters Structures of adsorbed water layers on MgO: an ab initio study R.M. Lynden; Single crystal surfaces 1. Introduction The structure of adsorbed ®lms of water on a perfect surface. Experimentally, water is found to adsorb reversibly on a ¯at MgO surface to form a monolayer at temperatures

Alavi, Ali

324

19 November 2001 Physics Letters A 290 (2001) 227233  

E-Print Network [OSTI]

of the (constrained) number partitioning problem. A concrete implementation of the algorithm on an Ising-type quantum of this Letter is to present a new QA for a problem of combinatorial optimization: * Corresponding author. E. The NPP can be solved by dynamic programming, in a time bounded by a low-order polynomial in nB [4]. As n

325

LETTER TO THE EDITOR Bacterial cooperation controlled by mobile  

E-Print Network [OSTI]

LETTER TO THE EDITOR Bacterial cooperation controlled by mobile elements: kin selection online 27 July 2011 Genes involved in bacterial cooperation and virulence are overrepresented on mobile elements (Nogueira et al., 2009). This highlights the importance of gene mobility in bacterial social

Rankin, Daniel

326

516 SDSU General Catalog 2013-2014 ARTS AND LETTERS  

E-Print Network [OSTI]

516 SDSU General Catalog 2013-2014 ARTS AND LETTERS Abajian, Mark E., M.A., Economics Abassi, Shogofa, M.A., Women's Studies Anderson, James T., Ph.D., Philosophy Barhoum, Sim, M.A., Rhetoric and Writing Studies Beck, Audrey Nicole, Ph.D., Sociology Black, Shannon B., M.A., Anthropology Borgen, Linda

Gallo, Linda C.

327

News Letter Institute of Advanced Energy, Kyoto University  

E-Print Network [OSTI]

;"Energy Research Issue" The IAE has many groups researching various fields of energy related issues. Abstract definition of energy consists of two parts: Energy = Exergy +Anergy Exergy is a part of energyNews Letter Institute of Advanced Energy, Kyoto University ISSN 1342-3193 IAE-NL-2014 No.54 http

Takada, Shoji

328

26 March 1999 Z .Chemical Physics Letters 302 1999 437446  

E-Print Network [OSTI]

26 March 1999 Z .Chemical Physics Letters 302 1999 437­446 Basis-set convergence of the energy of Chemistry, Uni?ersity of Oslo, P.O. Box 1033 Blindern, N-0315 Oslo, Norway Received 18 December 1998­Fock total energy and binding energy is investigated for the correlation-consistent cc-pVXZ basis sets

Helgaker, Trygve

329

Continued on next page A letter explaining the 2005 HVAC  

E-Print Network [OSTI]

Continued on next page A letter explaining the 2005 HVAC Change-out to consumers is available this bulletin, or downloaded from the 2005 HVAC Change out Information website at: www.energy.ca.gov/title24 duct sealing requirements for HVAC change-outs in existing homes become effective October 1, 2005

330

Parallel Processing Letters fc World Scientific Publishing Company  

E-Print Network [OSTI]

Parallel Processing Letters fc World Scientific Publishing Company SCHEDULING ISSUES Department, University of Idaho Moscow, Idaho 83844-1010, USA and AZAD AZADMANESH Computer Science Department, University of Nebraska at Omaha Omaha, Nebraska 68182-0500, USA and MILES McQUEEN Idaho National Engineering

Krings, Axel W.

331

Paducah DUF6 Conversion Final EIS - Appendix G: Responses to U.S. Department of Energy Letters to State Agencies and Native American Groups  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Paducah DUF Paducah DUF 6 Conversion Final EIS RESPONSES TO U.S. DEPARTMENT OF ENERGY LETTERS TO STATE AGENCIES AND NATIVE AMERICAN GROUPS Consultation Letters G-32 Paducah DUF 6 Conversion Final EIS Consultation Letters G-33 Paducah DUF 6 Conversion Final EIS Consultation Letters G-34 Paducah DUF 6 Conversion Final EIS Consultation Letters G-35 Paducah DUF 6 Conversion Final EIS Consultation Letters G-36 Paducah DUF 6 Conversion Final EIS Consultation Letters G-37 Paducah DUF 6 Conversion Final EIS Consultation Letters G-38 Paducah DUF 6 Conversion Final EIS Consultation Letters G-39 Paducah DUF 6 Conversion Final EIS Consultation Letters G-40 Paducah DUF 6 Conversion Final EIS Consultation Letters G-41 Paducah DUF 6 Conversion Final EIS Consultation Letters G-42 Paducah DUF 6 Conversion Final EIS Consultation Letters

332

Direct imaging of InSb (110)-(1x1) surface grown by molecular beam epitaxy  

SciTech Connect (OSTI)

High-resolution transmission electron microscopy under a profile imaging condition (HR-profile TEM) was employed to determine the structural model for the InSb(110)-(1x1) relaxation surface grown by molecular beam epitaxy (MBE). HR-profile TEM analyses indicate that the chevron model, which is widely accepted for zinc-blende-type III-V(110)-(1x1) surfaces prepared by cleavage, is also applicable to the InSb(110)-(1x1) surface prepared under an Sb-rich MBE condition. The assignment of atomic species (In or Sb) of InSb(110)-(1x1) surfaces was confirmed based on a HR-profile TEM image that captures the connected facets of InSb(110)-(1x1) and InSb(111)B-(2x2). On the basis of the well-known atomic species of InSb(111)B-(2x2), the atomic species of the InSb(110)-(1x1) surface were deduced straightforwardly: the atoms shifted upward and downward at the topmost layer of the InSb(110)-(1x1) surface are Sb and In, respectively. The atomic arrangements of the InSb(110)-(1x1)-InSb(111)B-(2x2) facet determined by HR-profile TEM may represent the atomic arrangements of zinc-blende-type III-V(331)B surfaces.

Mishima, T. D. [Homer L. Dodge Department of Physics and Astronomy, and Center for Semiconductor Physics in Nanostructures, University of Oklahoma, Norman, Oklahoma 73019 (United States)

2011-10-01T23:59:59.000Z

333

Pseudomorphic growth of InAs on misoriented GaAs for extending quantum cascade laser wavelength  

SciTech Connect (OSTI)

The authors have studied the impact of epilayer strain on the deposition of InAs/GaAs on (100) and (111)B with 2 offset toward<2-1-1> surfaces. Consequences of a 7% lattice mismatch between these orientations in the form of three-dimensional growth are less apparent for (111)B with 2 offset toward<2-1-1> surfaces compared to (100). By exploring a range of molecular beam epitaxy process parameters for InAs/GaAs growth and utilizing scanning electron microscopy, atomic force microscopy, and Raman spectroscopy to evaluate the quality of these strained layers, the authors develop empirical models that describe the influence of the process conditions in regards to surface roughness with >92% accuracy. The smoothest InAs/GaAs samples demonstrated average surface roughness of 0.08 nm for 10 ?m{sup 2} areas, albeit at very low deposition rates. The authors have found the most important process conditions to be substrate temperature and deposition rate, leading us to believe that controlling diffusion length may be the key to reducing defects in severely strained structures. InGaAs/AlGaAs quantum cascade laser structures were also produced on (111)B with 2 offset toward<2-1-1> to take advantage of the piezoelectric effect, and the modified laser transitions due to these effects were observed.

Meyer, Charles; Cheng, Emily; Grayer, Justin; Mueller, David; Triplett, Gregory; Roberts, Denzil [Department of Electrical and Computer Engineering, University of Missouri, 349 Engineering Building West, Columbia, Missouri 65201 (United States)] [Department of Electrical and Computer Engineering, University of Missouri, 349 Engineering Building West, Columbia, Missouri 65201 (United States); Graham, Samuel [Georgia Institute of Technology, Woodruff School of Mechanical Engineering, Atlanta, Georgia 30332 (United States)] [Georgia Institute of Technology, Woodruff School of Mechanical Engineering, Atlanta, Georgia 30332 (United States)

2013-11-15T23:59:59.000Z

334

GRR/Elements/14-CA-c.11 - Updated Draft Project Approval Letter | Open  

Open Energy Info (EERE)

1 - Updated Draft Project Approval Letter 1 - Updated Draft Project Approval Letter < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 14-CA-c.11 - Updated Draft Project Approval Letter The DOGGR State Board prepares an Updated Draft Project Approval Letter, reflecting the the public comments and Regional Board' proposed revisions. Logic Chain No Parents \V/ GRR/Elements/14-CA-c.11 - Updated Draft Project Approval Letter (this page) \V/ No Dependents Under Development Add.png Add an Element Retrieved from "http://en.openei.org/w/index.php?title=GRR/Elements/14-CA-c.11_-_Updated_Draft_Project_Approval_Letter&oldid=539626" Categories: Geothermal Regulatory Roadmap Elements Under Development What links here Related changes

335

Microsoft Word - Final Report Package Transmittal - FY 2010 FS Management Letter.doc  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy Memorandum DATE: December 20, 2010 REPLY TO ATTN OF: IG-322 (A10FN006) SUBJECT: Management Letter on the Audit of the Department of Energy's Consolidated Financial Statements for Fiscal Year 2010 TO: Chief Financial Officer, CF-1 Attached is the subject letter prepared by KPMG LLP, our contract auditors. The letter contains 23 new findings (see letter, Exhibit A) and 4 repeat findings (see letter, Exhibit B) that were issued during the course of the Fiscal Year 2010 audit of the Department of Energy's (Department) Consolidated Financial Statements. Management generally concurred with and provided planned corrective actions for most of the recommendations listed in the Management Letter and management's comments are included in each finding.

336

Enforcement Letter -Rocky Flats-08/02/2000  

Broader source: Energy.gov (indexed) [DOE]

, 2000 , 2000 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site 10808 Highway 93, Unit B Golden, CO 80403-8200 Subject: Enforcement Letter Dear Mr. Card: This letter refers to the Department of Energy's (DOE) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The potential noncompliances involved inadequate implementation of work controls, specifically failure to perform required combustible gas surveillances. The failure to fully perform the required surveillances was identified by the contractor during a comprehensive Kaiser-Hill (KHLL) Implementation Validation Review (IVR) team verifying implementation of the Basis of Interim Operation (BIO) for Buildings 776 and

337

Enforcement Letter, West Valley Nuclear Services - March 30, 1998 |  

Broader source: Energy.gov (indexed) [DOE]

West Valley Nuclear Services - March 30, 1998 West Valley Nuclear Services - March 30, 1998 Enforcement Letter, West Valley Nuclear Services - March 30, 1998 March 30, 1998 Issued to West Valley Nuclear Services related to Hazard Analysis, Design Review, Work Control Implementation, and a Contamination Event at the West Valley Demonstration Project This letter refers to the Department of Energy's (DOE) evaluation of West Valley Nuclear Services Company's (WVNS) report of a potential noncompliance with the requirements of 10 CFR 830.120 (Quality Assurance) and 10 CFR 835 (Occupational Radiation Protection). This potential noncompliance, which involved inadequate hazards analysis, design review, and implementation of work controls during decontamination activities for a high-level waste tank mobilization pump, was identified by WVNS on

338

Inspection Letter Report: INS-L-09-02  

Broader source: Energy.gov (indexed) [DOE]

\~ \~ , United States Government Department of Energy memorandum DATE. January 30, 2009 REPLY TO ATTNOF IG-40 sueJEcT Letter Report on "Questionable Purchases at the Hanford Site," INS-L-09-02, S09IS002 TO. Manager, Richland Operations Office Manager, Office of River Protection This letter report provides the results of an Office of Inspector General inspection of questionable purchases at the Department of Energy's Hanford Site (Hanford). During a review of the procurement card program at the Fluor Hanford Company (Fluor), we learned that Fluor and another Hanford prime contractor, CH2M Hill Hanford Company (CH2M Hill), had used Government funds to purchase overtime meals for employees. In addition, we learned Fluor had used Government funds to purchase gift items that were given away to

339

Enforcement Letter, Lockheed Martin Energy Systems, Inc. - September 4,  

Broader source: Energy.gov (indexed) [DOE]

Energy Systems, Inc. - Energy Systems, Inc. - September 4, 1997 Enforcement Letter, Lockheed Martin Energy Systems, Inc. - September 4, 1997 September 4, 1997 Issued to Lockheed Martin Energy Systems, Inc., related to the Erroneous Transfer of Mixed Waste to a Landfill at the K-25 Site This letter refers to the Department of Energy's (DOE) investigation of the erroneous transfer, during December 1996 through January 1997, of 165 55-gallon drums of mixed waste ash from K-25 to 'a Y-12 industrial landfill' for disposal. This incident was determined by DOE to be, in part, the result of several noncompliances with Title 10, Code of Federal Regulations, Part 830, "Nuclear Safety Management" (10 CFR 830). Lockheed Martin Energy Systems' (LMES) procedures did not provide adequate

340

Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Company - April 15, Savannah River Company - April 15, 1997 Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 April 15, 1997 Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site On February 11, 1997, the Office of Enforcement and Investigation (EH-10) met with members of your staff and the DOE Savannah River Operations Office (DOE-SR) to review your progress in correcting the noncompliances identified in the subject Noncompliance Tracking System (NTS) reports. A summary of our meeting and assessment of the information provided is enclosed with this letter. Your evaluation of the events and conditions leading to each of the occurrences, reported to EH-10 in the subject NTS reports, has identified

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Enforcement Letter - Los Alamos National Laboratory, October 9, 2001  

Broader source: Energy.gov (indexed) [DOE]

October 9, 2001 October 9, 2001 Dr. John Browne [ ] Los Alamos National Laboratory P.O. Box 1663 Los Alamos, NM 87545 Subject: Enforcement Letter Dear Dr. Browne: This letter refers to the Department of Energy's (DOE) evaluation of Los Alamos National Laboratory's (LANL) report of noncompliances with quality assurance provisions of DOE's nuclear safety requirements occurring at Los Alamos Critical Experiments Facility (LACEF) TA-18. These issues involved violations of the established LACEF Technical Safety Requirements (TSR) and were reported into the Noncompliance Tracking System (NTS) by your staff (NTS-ALO-LA-LANL-TA18-2000- 0001) on February 25, 2000. These noncompliances were a part of the enforcement action issued by DOE to LANL in December 2000 (EA 2000-13). Commitments in this NTS report include corrective action number 7 that stated "All

342

Enforcement Letter, Los Alamos National Laboratory - July 7, 1997 |  

Broader source: Energy.gov (indexed) [DOE]

July 7, 1997 July 7, 1997 Enforcement Letter, Los Alamos National Laboratory - July 7, 1997 July 7, 1997 Issued to the University of California related to Potential Quality Assurance Rule Violations associated with an Explosion and Fire at the Los Alamos National Laboratory This letter refers to the Department of Energy's (DOE's) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The noncompliances involved the failure of Los Alamos National Laboratory (LANL) to adequately implement the requirements contained in the governing quality assurance standard for stockpile evaluations in the areas of work controls and procedural compliance. As a result of these failures, an explosion and fire occurred at the [ ] on November 14, 1996.

343

Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 |  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory LLC- May 13, 2009 Oak Ridge National Laboratory LLC- May 13, 2009 Enforcement Letter, Oak Ridge National Laboratory LLC- May 13, 2009 May 13, 2009 Enforcement Letter issued to UT-Battelle, LLC related to a Radioactive Material Release at the Holifield Radioactive Ion Beam Facility at Oak Ridge National Laboratory The Department of Energy's Office of Enforcement within the Office of Health, Safety and Security has conducted an evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-ORO--ORNL-X10PHYSICS-2008-000 1, Operational Emergency at Building 6000, Holifield Radioactive Ion Beam Facility. Our evaluation included a review of the Oak Ridge National Laboratory (ORNL) Management Investigation Team Report dated November 19, 2008, the associated corrective action plan,

344

Enforcement Letter - Rocky Flats -07/20/1998  

Broader source: Energy.gov (indexed) [DOE]

, 1998 , 1998 Mr. Robert G. Card [ ] Kaiser-Hill Company, L.L.C. Rocky Flats Environmental Technology Site P.O. Box 464 Golden, CO 80402-0464 Subject: Enforcement Letter Noncompliance Reports NTS-RFO--KHLL-SITEWIDE-1997-0006 NTS-RFO--KHLL-371OPS-1997-0002 NTS-RFO--KHLL-SITEWIDE-1997-0010 NTS-RFO--KHLL-SITEWIDE-1998-0001 Dear Mr. Card: This letter refers to the Department of Energy=s (DOE) evaluation of noncompliances reported in four Noncompliance Tracking System (NTS) entries, identified in the subject line above. The four NTS reports were submitted between September 24, 1997, and March 3, 1998. The reports identified potential noncompliances with requirements of 10 CFR 830.120 (Quality Assurance Rule) and 10 CFR 835 (Radiation Protection Rule). The Office of Enforcement and Investigation evaluated these NTS reports based on the

345

Enforcement Letter -Savannah River-06/07/2000  

Broader source: Energy.gov (indexed) [DOE]

7, 2000 7, 2000 Paul Bertsch, PhD [ ] Savannah River Ecology Laboratory Drawer E Aiken, SC 29802 Subject: Enforcement Letter (NTS-SR--SREL-2000-0001) Dear Dr. Bertsch: This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office of Enforcement and Investigation (EH-Enforcement) staff discussed the details of the

346

Enforcement Letter, International Isotopes Idaho Inc - August 20, 1999 |  

Broader source: Energy.gov (indexed) [DOE]

International Isotopes Idaho Inc - August 20, International Isotopes Idaho Inc - August 20, 1999 Enforcement Letter, International Isotopes Idaho Inc - August 20, 1999 August, 20, 1999 Issued to International Isotopes Idaho, Inc. related to the Relocation of an Irradiated Pellet at the Test Reactor Area Hot Cell Facility at the Idaho National Engineering and Environmental Laboratory This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the relocation of an irradiated [isotope] pellet from within a hot cell to an adjoining, outside, charging port service area. This incident occurred on January 6, 1999, at the Idaho National Engineering and Environmental Laboratory's Test Reactor Area Hot Cell Facility (TRA-632). Building TRA-632 is utilized by International

347

Enforcement Letter, Oak Ridge National Laboratory - May 31, 2002 |  

Broader source: Energy.gov (indexed) [DOE]

- May 31, 2002 - May 31, 2002 Enforcement Letter, Oak Ridge National Laboratory - May 31, 2002 May 31, 2002 Enforcement Letter issued to UT-Battelle, LLC related to Unplanned Radiation Exposures at Oak Ridge National Laboratory The Office of Price-Anderson Enforcement (OE) has conducted a preliminary evaluation of the deficiencies described in Noncompliance Tracking System (NTS) report NTS-ORO--ORNL-X10PHYSICS-2002-0001. Our evaluation included review of the investigation report, associated corrective action plan, and discussion with site personnel. The subject NTS report described a series of deficiencies that resulted in several personnel being exposed to unanticipated radiation fields during the startup testing of an electron cyclotron resonance (ECR) source at the

348

Enforcement Letter, Battelle Memorial Institute - May 5, 2004 | Department  

Broader source: Energy.gov (indexed) [DOE]

Memorial Institute - May 5, 2004 Memorial Institute - May 5, 2004 Enforcement Letter, Battelle Memorial Institute - May 5, 2004 May 5, 2004 Enforcement Letter issued to Battelle Memorial Institute related to Radiological Work Practices at the Pacific Northwest National Laboratory The subject NTS report described multiple deficiencies identified through a DOE-RL assessment of contamination control and survey practices associated with fume hood work at the PNNL Radiochemical Processing Laboratory. The DOE-RL assessment was formally transmitted to PNNL on November 10, 2003. Specific deficiencies identified as part of the DOE assessment included multiple instances of workers failing to perform required contamination self-surveys, workers performing incomplete or cursory self-surveys, and workers failing to perform or

349

Letter, June 14, 2007, Preliminary Notice of Violation  

Broader source: Energy.gov (indexed) [DOE]

June 14, 2007 June 14, 2007 Dr. Robert Iotti President and Chief Executive Officer CH2M-Washington Group Idaho, L.L.C. 2525 Freemont Street Idaho Falls, Idaho 83415-5104 Dear Dr. Iotti: This letter refers to the investigation of events at the Radioactive Waste Management Complex - Accelerated Retrieval Project (ARP) by the Department of Energy's (DOE) Office of Enforcement. The investigation summary report, Multiple Radiological Protection Program Deficiencies and Safety Culture Concerns, was provided to you in a letter dated February 20, 2007. An enforcement conference to discuss these findings was held on March 21, 2007, in Germantown, Maryland, with you and members of your staff. A summary of the conference is enclosed. Based on our evaluation of the evidence in this matter,

350

Enforcement Letter, Battelle Energy Alliance, LLC - September 14, 2009 |  

Broader source: Energy.gov (indexed) [DOE]

Energy Alliance, LLC - September 14, Energy Alliance, LLC - September 14, 2009 Enforcement Letter, Battelle Energy Alliance, LLC - September 14, 2009 September 14, 2009 Enforcement Letter issued to Battelle Energy Alliance, LLC related to a Failed Scram Event at the Neutron Radiography Reactor at the Idaho National Laboratory The U.S. Department of Energy's (DOE) Office of Enforcement, within the Office of Health, Safety and Security, conducted an evaluation of the deficiencies associated with the Occurrence Reporting and Processing System (ORPS) report NE-ID--BEA-NRAD-2008-0003, Shim Rod #2 Failure to SCRAM. Our evaluation included a review of documents and discussions with site personnel. Documents reviewed included the Battelle Energy Alliance, LLC (BEA) Cause Analysis Report and Corrective Action Plan NE-ID-BEA-NRAD-2008-0003, Shim

351

Enforcement Letter, Safety and Ecology Corporation - NEL-2011-04 |  

Broader source: Energy.gov (indexed) [DOE]

Safety and Ecology Corporation - NEL-2011-04 Safety and Ecology Corporation - NEL-2011-04 Enforcement Letter, Safety and Ecology Corporation - NEL-2011-04 October 24, 2011 Enforcement Letter issued to Safety and Ecology Corporation related to Two Radiological Contamination Events at the Separations Process Research Unit at the Knolls Atomic Power Laboratory The Office of Health, Safety and Security's Office of Enforcement and Oversight conducted an evaluation of the two contamination events at the Separations Process Research Unit (SPRU) at the Knolls Atomic Power Laboratory (KAPL) in Niskayuna, New York. On August 24, 2010, contaminated sludge leaked from two pumps inside the Building H2 Tank Farm Weather Enclosure after excessive pressure was applied to clear a clogged nozzle. The sludge contained radioisotopes from nuclear fuel reprocessing

352

Enforcement Letter, Isoteck Systems, LLC - January 20, 2010 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Isoteck Systems, LLC - January 20, 2010 Isoteck Systems, LLC - January 20, 2010 Enforcement Letter, Isoteck Systems, LLC - January 20, 2010 January 20, 2010 Enforcement Letter issued to Isotek Systems, LLC related to Quality Assurance Issues associated with the U233 Material Downblending and Disposition Project at Oak Ridge National Laboratory The U.S. Department of Energy's (DOE) Office of Enforcement, within the Office of Health, Safety and Security, conducted an evaluation of the deficiencies described in Noncompliance Tracking System Report NTS-ORO--ISOTEK-3019-2008-0001. Our evaluation included a review ofIsotek Systems, LLC (Isotek) causal factors analysis and corrective actions, and other requested documentation, as well as discussions with Isotek senior management and DOE Oak Ridge Office

353

Enforcement Letter, Argonne National Laboratory-East - August 6, 1996 |  

Broader source: Energy.gov (indexed) [DOE]

August 6, August 6, 1996 Enforcement Letter, Argonne National Laboratory-East - August 6, 1996 August 6, 1996 Issued to the University of Chicago related to an Unplanned and Uncontrolled Employee Radiation Exposure at the Argonne National Laboratory-East This letter refers to the Department of Energy's (DOE) evaluation of Argonne National Laboratory-East's (ANL-E) report of a potential noncompliance with the requirements of 10 CFR 835 (Occupational Radiation Protection). This potential noncompliance, which involved the unexpected, uncontrolled radiation exposure of an ANL-E temporary employee during January- August 1995 was identified by ANL-E on December 11, 1995, and reported to DOE on March 1, 1996, in the Noncompliance Tracking System (NTS). The exposure to the ANL-E temporary employee resulted from

354

Enforcement Letter-Savannah River-03/29/2000  

Broader source: Energy.gov (indexed) [DOE]

0 0 Mr. Joseph J. Buggy, President [ ] Building 703-A Road 1 Aiken, SC 29802 Subject: Enforcement Letter (NTS-SR-WSRC-ESH-1999-0002) Dear Mr. Buggy: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the referenced Noncompliance Tracking System (NTS) Report which describes the failure to properly retrain portions of the Westinghouse Savannah River Company (WSRC) nonradiological workforce with General Employee Radiological Training (GERT) and the failure to provide such training to all temporary visitors and individuals badged at other DOE locations. These deficiencies were identified by the WSRC Price-Anderson Coordinator in a 10 CFR 835 assessment. The deficiencies identified were noncompliances with the following requirements:

355

Enforcement Letter - Oak Ridge - 09/04/1997  

Broader source: Energy.gov (indexed) [DOE]

4, 1997 4, 1997 Dr. Robert Van Hook [ ] Lockheed Martin Energy Systems, Inc. P.O. Box 2009 Oak Ridge, TN 37831-8002 Subject: Enforcement Letter Occurrence Report ORO--LMES-K25WASTMAN-1997-0001 Dear Dr. Van Hook: This letter refers to the Department of Energy's (DOE) investigation of the erroneous transfer, during December 1996 through January 1997, of 165 55-gallon drums of mixed waste ash from K-25 to [a Y-12 industrial landfill] for disposal. This incident was determined by DOE to be, in part, the result of several noncompliances with Title 10, Code of Federal Regulations, Part 830, "Nuclear Safety Management" (10 CFR 830). Lockheed Martin Energy Systems' (LMES) procedures did not provide adequate administrative control for the identification of drums intended for the Y-12 landfill nor for

356

Enforcement Letter, Westinghouse Hanford Corporation - July 6, 1995 |  

Broader source: Energy.gov (indexed) [DOE]

July 6, 1995 July 6, 1995 Enforcement Letter, Westinghouse Hanford Corporation - July 6, 1995 July 6, 1995 Issued to Westinghouse Hanford Corporation related to Radiological Work Control Deficiencies at the Plutonium Uranium Extraction Facility at the Hanford Site This letter refers to the Department of Energy's (DOE) evaluation of Westinghouse Hanford Company's (WHC) investigation of an event that occurred between February 22-March 7, 1995, at the Plutonium Uranium Extraction Facility (PUREX) at DOE's Hanford site. The event, which involved the cutting of a highly contaminated canyon exhaust air sampling probe as part of waste disposal activities without adequate management controls, resulted in your decision to temporarily curtail waste cutting activities. Based on your investigation of the event,

357

Microsoft Word - AcquisitionLetter95-14.doc  

Broader source: Energy.gov (indexed) [DOE]

Cooperation with the New Independent States of the Former Soviet Union Cooperation with the New Independent States of the Former Soviet Union The following Acquisition Letter 95-14 includes the terms and conditions (both intellectual property and non-intellectual property) that are to be used in subcontracts between DOE national laboratories and institutes in the New Independent States of the Former Soviet Union (NIS). There are two patent and data clauses - one for the Initiatives for Proliferation Program (IPP), formerly known as the Industrial Partnering Program, and one for all other DOE programs. AUTHORITY This Acquisition Letter (AL) is issued by the Procurement Executive pursuant to a delegation from the Secretary and under the authority of the Department of Energy Acquisition Regulation (DEAR) subsections 901.301-70 and 901.301-71.

358

Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Ecology Laboratory - June 7, Savannah River Ecology Laboratory - June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 June 7, 2000 Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office

359

Enforcement Letter, National Security Technologies LLC,- November 13, 2007  

Broader source: Energy.gov (indexed) [DOE]

Technologies LLC,- November Technologies LLC,- November 13, 2007 Enforcement Letter, National Security Technologies LLC,- November 13, 2007 November 13, 2007 Enforcement Letter issued to National Security Technologies, LLC related to an Unplanned Radiological Exposure during a Borehole Activity at the Nevada Test Site The Department of Energy's (DOE) Office of Enforcement conducted an evaluation of the deficiencies described in Noncompliance Tracking System (NTS) Report NTS-NSO--NST-NTS-2007-0002, Unplanned Radiological Exposure during Borehole Activity. Our evaluation included reviews of the associated critique and root cause analysis reports, and the related corrective action plan. Based on our evaluation, we have concluded that violations of 10 C.F.R. 835, Occupational Radiation Protection,occurred

360

Enforcement Letter, Stony Brook University Hospital - April 15, 1999 |  

Broader source: Energy.gov (indexed) [DOE]

Stony Brook University Hospital - April 15, Stony Brook University Hospital - April 15, 1999 Enforcement Letter, Stony Brook University Hospital - April 15, 1999 April 15, 1999 Issued to Stony Brook University Hospital related to a Failed Interlock at the Radiation Therapy Facility at the Brookhaven National Laboratory This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning an event at the Radiation Therapy Facility (RTF) occurring in March 1998. In November 1998, DOE conducted an investigation to determine whether violations of DOE's nuclear safety rules associated with the event had occurred. The resulting Investigation Summary Report was transmitted to you on February 19, 1999. On March 11, 1999, you participated in an Enforcement Conference, along with Brookhaven

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Enforcement Letter, NEL-2011-01 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NEL-2011-01 NEL-2011-01 Enforcement Letter, NEL-2011-01 March 31, 2011 Enforcement Letter issued to LATA Environmental Services of Kentucky, LLC, regarding work control issues that resulted in the release of uranium hexafluoride (UF6) at the Paducah Gaseous Diffusion Plant The Office of Health, Safety and Security's Office of Enforcement conducted an evaluation of the facts and circumstances associated with quality assurance deficiencies resulting from recent decontamination and decommissioning (D&D) activities on or near uranium hexafluoride (UF6) and hydrofluoric acid lines at the Department of Energy's (DOE) Paducah Gaseous Diffusion Plant in Paducah, Kentucky. On September 28, 2010, LATA Environmental Services of Kentucky, LLC (LATA Kentucky) reported to DOE noncompliances associated with these deficiencies in Noncompliance

362

Enforcement Letter-Oak Ridge-07/30/1999  

Broader source: Energy.gov (indexed) [DOE]

Robert Van Hook, Jr. Robert Van Hook, Jr. [ ] Lockheed-Martin Energy Systems, Inc. P.O. Box 2009 Oak Ridge, TN 37831-8001 Subject: Enforcement Letter Dear Dr. Van Hook: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the unexpected uptakes of a radioactive material, [ ], by employees at the Y-12 Plant subsequent to the June 8, 1998, restart of [ ] operations [ ]. These uptakes occurred at Y-12 Buildings 9212 and 9215 and involved 55 workers over a period of approximately five months. Radiation doses received by these workers ranged from 115 to 1124 millirem committed effective dose equivalent. During April 6-7, 1999, DOE conducted an investigation of these uptakes to determine what, if any, noncompliances with nuclear safety regulations may have occurred. A copy of the

363

Letter from Commonwealth to Mirant Potomac River Concerning Serious  

Broader source: Energy.gov (indexed) [DOE]

to Mirant Potomac River Concerning Serious to Mirant Potomac River Concerning Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide Letter from Commonwealth to Mirant Potomac River Concerning Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide Docket No. EO-05-01: Letter from Commonwealth of Virginia to Mirant Potomac River concerning Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide. Notification to Mirant by the Commonwealth of Virginia of Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide More Documents & Publications Notification to Mirant by the Commonwealth of Virginia of Serious Violations of the National Ambient Air Quality Standards for Sulfur Dioxide Comments on Department of Energy's Emergency Order To Resume Limited

364

Enforcement Letter, Los Alamos National Laboratory - July 7, 1997 |  

Broader source: Energy.gov (indexed) [DOE]

July 7, 1997 July 7, 1997 Enforcement Letter, Los Alamos National Laboratory - July 7, 1997 July 7, 1997 Issued to the University of California related to Potential Quality Assurance Rule Violations associated with an Explosion and Fire at the Los Alamos National Laboratory This letter refers to the Department of Energy's (DOE's) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The noncompliances involved the failure of Los Alamos National Laboratory (LANL) to adequately implement the requirements contained in the governing quality assurance standard for stockpile evaluations in the areas of work controls and procedural compliance. As a result of these failures, an explosion and fire occurred at the [ ] on November 14, 1996.

365

Enforcement Letter - Savannah River-07/21/1998  

Broader source: Energy.gov (indexed) [DOE]

21, 1998 21, 1998 Mr. A. L. Schwallie [ ] Westinghouse Savannah River Company Building 703-A, P.O. Box 616 Road 1 Aiken, SC 29802 Subject: Enforcement Letter Incomplete Corrective Action for Noncompliance Report: NTS-SR--WSRC-SLDHZD-1996-0001 Dear Mr. Schwallie: The Office of Enforcement and Investigation (EH-10) has received your letter dated June 30, 1998, Subject: Notification of Incomplete Corrective Action, in which you report that one corrective action for the above referenced NTS report was not completed and only partially implemented in the field. This action dealt with developing and implementing qualification standards for Generator Certification Officials and was reported by Westinghouse Savannah River Company (WSRC) as being completed June 30, 1997.

366

Enforcement Letter, Battelle Memorial Institute - May 5, 2004 | Department  

Broader source: Energy.gov (indexed) [DOE]

Battelle Memorial Institute - May 5, 2004 Battelle Memorial Institute - May 5, 2004 Enforcement Letter, Battelle Memorial Institute - May 5, 2004 May 5, 2004 Enforcement Letter issued to Battelle Memorial Institute related to Radiological Work Practices at the Pacific Northwest National Laboratory The subject NTS report described multiple deficiencies identified through a DOE-RL assessment of contamination control and survey practices associated with fume hood work at the PNNL Radiochemical Processing Laboratory. The DOE-RL assessment was formally transmitted to PNNL on November 10, 2003. Specific deficiencies identified as part of the DOE assessment included multiple instances of workers failing to perform required contamination self-surveys, workers performing incomplete or cursory self-surveys, and workers failing to perform or

367

Enforcement Letter, Westinghouse Hanford Corporation - September 22, 1995 |  

Broader source: Energy.gov (indexed) [DOE]

September September 22, 1995 Enforcement Letter, Westinghouse Hanford Corporation - September 22, 1995 September 22, 1995 Issued to Westinghouse Hanford Corporation related to Operational Safety Requirements Implementation at the B Plant/Waste Encapsulation and Storage Facility at the Hanford Site This letter refers to the Department of Energy's (DOE) evaluation of Westinghouse Hanford Company's (WHC) report of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Requirements) at the Hanford B Plant/Waste Encapsulation Facility (WESF). These potential noncompliances were identified by WHC on May 8, 1995, during a self-initiated comprehensive assessment of the facilities Operational Safety Requirements (OSR) program and reported to DOE on May 24, 1995.

368

Enforcement Letter, International Isotopes Idaho Inc - August 20, 1999 |  

Broader source: Energy.gov (indexed) [DOE]

International Isotopes Idaho Inc - August 20, International Isotopes Idaho Inc - August 20, 1999 Enforcement Letter, International Isotopes Idaho Inc - August 20, 1999 August, 20, 1999 Issued to International Isotopes Idaho, Inc. related to the Relocation of an Irradiated Pellet at the Test Reactor Area Hot Cell Facility at the Idaho National Engineering and Environmental Laboratory This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the relocation of an irradiated [isotope] pellet from within a hot cell to an adjoining, outside, charging port service area. This incident occurred on January 6, 1999, at the Idaho National Engineering and Environmental Laboratory's Test Reactor Area Hot Cell Facility (TRA-632). Building TRA-632 is utilized by International

369

Enforcement Letter,WEL-2012-05 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

WEL-2012-05 WEL-2012-05 Enforcement Letter,WEL-2012-05 December 20, 2012 Enforcement Letter issued to Alliance for Sustainable Energy, LLC, related to an Electrical Shock Near Miss Incident that occurred on February 27, 2012, at the National Renewable Energy Laboratory The Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated an electrical shock near miss incident that occurred on February 27, 2012, at the National Renewable Energy Laboratory (NREL). The Alliance for Sustainable Energy, LLC (Alliance) manages and operates NREL under a contract with the Department of Energy (DOE) and is subject to the provisions of DOE's Worker Safety and Health Program rule (10 C.F.R. Part 851). The event revealed weaknesses in Alliance's electrical hazard

370

Enforcement Letter, WEL-2012-04 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-04 2-04 Enforcement Letter, WEL-2012-04 November 5, 2012 Enforcement Letter issued to URS E&C Holdings Incorporated, related to Regulatory Issues Associated with a Series of Fall Protection Occurrences at the Separations Process Research Unit Disposition Project The Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated a series of fall protection occurrences associated with URS E&C Holdings Incorporated's (URS) operations at the Department of Energy (DOE) Separations Process Research Unit (SPRU) Disposition Project (DP) in Niskayuna, New York. These occurrences took place between November 2011 and July 2012, and included an event involving a URS employee working close to a second floor wall opening in building G2 at SPRU on July 9,

371

Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 |  

Broader source: Energy.gov (indexed) [DOE]

Savannah River Ecology Laboratory - June 7, Savannah River Ecology Laboratory - June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 June 7, 2000 Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office

372

Enforcement Letter-Richland-07/31/1998  

Broader source: Energy.gov (indexed) [DOE]

1, 1998 1, 1998 Mr. R. D. Hanson [ ] Fluor Daniel Hanford, Inc. P.O. Box 1000 MS/H5-20 Richland, WA 99352-1000 Subject: Enforcement Letter Noncompliance Number NTS-RL--PHMC-PHMCGENL-1998-0003 Dear Mr. Hanson: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances surrounding the failure of Fluor Daniel Hanford, Incorporated (FDH) to effectively complete corrective actions for Enforcement Action 96-02 (EA 96-02), although FDH informed the DOE Richland Operations Office (DOE-RL) that such work had been completed. 10 CFR 830.120 (c)(1)(iii) (Quality Improvement) mandates processes to detect and prevent quality problems be established and implemented. 10 CFR 830.120 (c)(2)(i) (Work Processes) requires that work be performed to established technical standards

373

Enforcement Letter, National Security Technologies LLC,- November 13, 2007  

Broader source: Energy.gov (indexed) [DOE]

National Security Technologies LLC,- November National Security Technologies LLC,- November 13, 2007 Enforcement Letter, National Security Technologies LLC,- November 13, 2007 November 13, 2007 Enforcement Letter issued to National Security Technologies, LLC related to an Unplanned Radiological Exposure during a Borehole Activity at the Nevada Test Site The Department of Energy's (DOE) Office of Enforcement conducted an evaluation of the deficiencies described in Noncompliance Tracking System (NTS) Report NTS-NSO--NST-NTS-2007-0002, Unplanned Radiological Exposure during Borehole Activity. Our evaluation included reviews of the associated critique and root cause analysis reports, and the related corrective action plan. Based on our evaluation, we have concluded that violations of 10 C.F.R. 835, Occupational Radiation Protection,occurred

374

Enforcement Letter, NEL-2013-03 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3 3 Enforcement Letter, NEL-2013-03 July 22, 1013 Issued to Lawrence Livermore National Security, LLC related to Programmatic Deficiencies in the Software Quality Assurance Program at the Lawrence Livermore National Laboratory The Office of Health, Safety and Security's Office of Enforcement and Oversight has evaluated the facts and circumstances surrounding programmatic deficiencies identified in the Lawrence Livermore National Security, LLC (LLNS) software quality assurance (SQA) program. LLNS reported these deficiencies on January 16, 2013, in Noncompliance Tracking System (NTS) report NTS--LSO-LLNL-LLNL-2013-0001, LLNL Software Quality Assurance Program Does Not Meet DOE 0 414.1 D Standards and Procedures Requirements. Defense Nuclear Facilities Safety Board (DNFSB) issued a letter to the

375

Resource Letter PSEn-1: Physics and society: Energy  

Science Journals Connector (OSTI)

This Resource Letter provides a guide to the physics-related literature about energy-and-society. Journal articles books and websites are cited for the following topics: general references textbooks other pedagogical resources population growth fossil fuels global warming nuclear power side effects of nuclear power fusion power renewable resources (including hydroelectric biofuels wind photovoltaics direct solar geothermal hydrogen and energy storage) energy efficiency and transportation efficiency.

Art Hobson

2007-01-01T23:59:59.000Z

376

Savannah River Site- Tank 48 Transmittal Letter of SRS Tank 48 Review  

Broader source: Energy.gov [DOE]

This letter reviews the Path Forward for Savannah River Site Tank 48 and outlines best judgement on all issues and recommendations on how to procede.

377

Letters of Interest PRICE/COST Estimate Sheet for [Insert LOI...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(Typed Name) NREL Form (10-5-2000) Letters of Interest PRICECOST Estimate Sheet for Description Base Year Phase Option Year I Phase Option Year...

378

POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non...  

Broader source: Energy.gov (indexed) [DOE]

Contractor Business Systems Clauses for Section H - Earned Value Management Clause POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and Operating...

379

Letter from the Department of Energy to the District of Columbia...  

Broader source: Energy.gov (indexed) [DOE]

the Department of Energy to the District of Columbia Public Service Commission with respect to the Emergency Petition and Complaint Letter from the Department of Energy to the...

380

Funding Board Application Please submit your application, resume, and a cover letter to an ASMSU Administrative Assistant in  

E-Print Network [OSTI]

Funding Board Application 2014-2015 Please submit your application, resume, and a cover letter will not be reviewed without a resume and a cover letter. (Please Print) Date:____________________________ Name

Maxwell, Bruce D.

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Attached is Policy Flash 2013-34 Department of Energy Acquisition Letter 2013-04 on Executive Compensation  

Broader source: Energy.gov [DOE]

Attached is Policy Flash 2013-34 Department of Energy Acquisition Letter 2013-04 on Executive Compensation

382

Honorary Degrees Awarded at UCF August 2014 Judith A. Albertson, Doctor of Humane Letters  

E-Print Network [OSTI]

2007 Charles Hard Townes, Doctor of Science December 2006 Rita Bornstein, Doctor of Humane Letters March 2006 Anibel Acevedo Vila, Doctor of Public Science May 2005 Harriet Elam-Thomas, Doctor of Public Duffey, Doctor of Humane Letters June 1979 Albert F. Hegenberger, Doctor of Engineering Science Lee R

Foroosh, Hassan

383

Ecology Letters, (2003) 6: 13-18 Are three-dimensional spider webs defensive  

E-Print Network [OSTI]

LETTER Ecology Letters, (2003) 6: 13-18 Are three-dimensional spider webs defensive adaptations? Abstract Spider webs result from complex behaviours that have evolved under many selective pressures. Webs risk in the evolution of web architecture. The ecological success of spiders has been attributed to key

Mathis, Wayne N.

384

The University of Georgia Job Search Strategies | Resume | Cover Letter | Interviewing | Social Media  

E-Print Network [OSTI]

The University of Georgia Job Search Strategies | Resume | Cover Letter | Interviewing | Social Fair 6 Reference/Recommendation Guidelines 7 Resume Guidelines 8 Sample Resumes 9-13 Power Verbs 14 a Major · Choosing a Career · Resumes · Cover Letters · Mock Interviews · The Job Search · Personal

Arnold, Jonathan

385

IEEE POWER ELECTRONICS LETTERS, VOL. 2, NO. 2, JUNE 2004 51 Digital Phase Control for Resonant Inverters  

E-Print Network [OSTI]

. In this letter, we present and verify a new concept for direct digital phase control of resonant invertersIEEE POWER ELECTRONICS LETTERS, VOL. 2, NO. 2, JUNE 2004 51 Digital Phase Control for Resonant Inverters Yan Yin, Student Member, IEEE, and Regan Zane, Member, IEEE Abstract--This letter presents

386

Enforcement Letter, Kaiser-Hill Company, L.L.C. - June 19, 2002 |  

Broader source: Energy.gov (indexed) [DOE]

June 19, 2002 June 19, 2002 Enforcement Letter, Kaiser-Hill Company, L.L.C. - June 19, 2002 June 19, 2002 Enforcement Letter issued to Kaiser-Hill Company, LLC related to Unplanned Radioactive Material Uptakes at the Rocky Flats Environmental Technology Site This letter refers to the Department of Energy's evaluation of facts and circumstances concerning the October 2001 unplanned uptakes of radioactive material by two Radiological Control Technicians (RCT) in Building [ ]. These issues were reported into the Noncompliance Tracking System (NTS) by your staff (NTS-RFO--KHLL-[ ] 2002-0001) on February 11, 2002. Enforcement Letter, Kaiser-Hill Company, L.L.C. - June 19, 2002 More Documents & Publications Consent Order, Kaiser-Hill Company, LLC - EA 98-03 Enforcement Letter, Kaiser-Hill Company, L.L.C. - July 20, 1998

387

Auidit Letter Report: OAS-L-09-08 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Auidit Letter Report: OAS-L-09-08 Auidit Letter Report: OAS-L-09-08 Auidit Letter Report: OAS-L-09-08 June 30, 2009 Effectiveness in Implementing the Cooperative Audit Strategy The Cooperative Audit Strategy, was developed by the Office of Inspector General, in consultation with the Office of Chief FInancial Officer, the Office of Procurement and Assistance Management, and the Contractor Internal Audit Council. The Strategy was developed after a 1992 OIG report identified that the quality of the Management and Operating (M&O) contractor's internal audit functions work was inconsistent and unsatisfactory and could not be relied upon for internal control purposes. Topic: Management and Administration Auidit Letter Report: OAS-L-09-08 More Documents & Publications Audit Letter Report: OAS-L-09-11

388

Auidit Letter Report: OAS-L-09-08 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Auidit Letter Report: OAS-L-09-08 Auidit Letter Report: OAS-L-09-08 Auidit Letter Report: OAS-L-09-08 June 30, 2009 Effectiveness in Implementing the Cooperative Audit Strategy The Cooperative Audit Strategy, was developed by the Office of Inspector General, in consultation with the Office of Chief FInancial Officer, the Office of Procurement and Assistance Management, and the Contractor Internal Audit Council. The Strategy was developed after a 1992 OIG report identified that the quality of the Management and Operating (M&O) contractor's internal audit functions work was inconsistent and unsatisfactory and could not be relied upon for internal control purposes. Topic: Management and Administration Auidit Letter Report: OAS-L-09-08 More Documents & Publications Audit Letter Report: OAS-L-09-11

389

Enforcement Letter , Babcock & Wilcox Technical Services Y-12, LLC - July  

Broader source: Energy.gov (indexed) [DOE]

Letter , Babcock & Wilcox Technical Services Y-12, LLC Letter , Babcock & Wilcox Technical Services Y-12, LLC - July 10, 2009 Enforcement Letter , Babcock & Wilcox Technical Services Y-12, LLC - July 10, 2009 July 10, 2009 Enforcement Letter issued to Babcock & Wilcox Technical Services Y-12, LLC related to the Protection of Classified Information at the Y-12 National Security Complex The purpose of this enforcement letter is to communicate the Office of Health, Safety and Security's Office of Enforcement concerns with the protection of classified information at the Y-12 National Security Complex (Y-12). A recent Office of Security Enforcement analysis of security incidents identified a number of concerns that warrant prompt attention by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) management to

390

2003 CS 647b Report Transmittal Letter to Dick Cheney | Department of  

Broader source: Energy.gov (indexed) [DOE]

2003 CS 647b Report Transmittal Letter to Dick Cheney 2003 CS 647b Report Transmittal Letter to Dick Cheney 2003 CS 647b Report Transmittal Letter to Dick Cheney 2003 CS 647b Report Transmittal Letter to Dick Cheney This letter is in response to the annual Competitive Sourcing reporting requirement contained in section 647(b) of Division F of the Consolidated Appropriations Act, for FY 2004, P.L. 108-199. The enclosed report on the Department of Energy's (DOE) Competitive Sourcing program complies with the agency reporting elements outlined in P.L. 108-199 for submitting the annual Congressional Competitive Sourcing Activity Report. In summary, DOE's Fiscal Year (FY) 2003 Competitive Sourcing Activity Report includes cost, savings, Federal full-time equivalent (FTE), and other information on the Department's

391

Response by PJM to letters from the City of Alexandria and the Virginia  

Broader source: Energy.gov (indexed) [DOE]

by PJM to letters from the City of Alexandria and the by PJM to letters from the City of Alexandria and the Virginia Department of Environmental Quality pursuant to Order No. 202-05-03 Response by PJM to letters from the City of Alexandria and the Virginia Department of Environmental Quality pursuant to Order No. 202-05-03 Docket No. EO-05-01: Following the release of the Department of Energy's Order No. 202-05-3 issued December 20, 2005 (the "Order"), both the Virginia Department of Environmental Quality ("DEQ") and the City of Alexandria (the "City") have filed letters asserting an imminent breach of the Order. PJM responds to those letters and takes issue both (i) with the assertion of an imminent breach of the Order, and (ii) the suggestion that maintenance of transmission facilities serving the District of Columbia be

392

Particles and nuclei, letters, in Russian, pt.3  

E-Print Network [OSTI]

The present collection of letters from JINR, Dubna, contains eight separate records on the role of the complanar emission of particles in nuclear interaction for E sub 0 >10 sup 1 sup 6 eV detected in the stratosphere, sup 1 sup 0 B nucleus fragment yields, nuclear teleportation (proposal for an experiment), invisible 'glue' bosons in model field theory, calculation of the ionization differential effective cross sections in fast ion-atom collisions, interactions of ultracold neutrons near surface of solids, g factors as a probe for high-spin structure of neutron-rich Dy isotopes, search for periodicities in experimental data by the autoregressive model methods

2002-01-01T23:59:59.000Z

393

Enforcement Letter, Los Alamos National Laboratory - January 17, 1997 |  

Broader source: Energy.gov (indexed) [DOE]

January 17, January 17, 1997 Enforcement Letter, Los Alamos National Laboratory - January 17, 1997 January 17, 1997 Issued to the University of California related to Radiological Worker Training Deficiencies at the Los Alamos National Laboratory On December 4, 1996, the referenced potential noncompliance was reported to DOE by Los Alamos National Laboratory (LANL). The report describes an assessment conducted by LANL after a determination was made that at least nine employees at Building TA-55 had not received radiological worker training in accordance with the requirements of 10 CFR 835. The issue was initially raised by DOE/LAAO and the facility Price-Anderson Amendments Act (PAAA) coordinator conducted a preliminary review. Based on that assessment, the coordinator decided to report the

394

MULTIPLE LETTERS Mr. James Speir, Vice President Phosphate Operations  

Office of Legacy Management (LM)

52. 52. APR 9 1986 MULTIPLE LETTERS Mr. James Speir, Vice President Phosphate Operations International Minerals and Chemical Corporation P.O. Box 7047 Lakeland, Florida 33807 Dear Mr. Speir: The Department of Energy is evaluating the radiological condition of sites that were utilized by the Manhattan Engineer District and the Atomic Energy Commission (AEC) during the early years of nuclear energy development to determine whether they need remedial action and whether the Department has authority to perform such action. As you may be aware through previous correspondence, the International Minerals and Chemical Corporation facility in Mulberry, Florida, was identified as one such site, as a result of some research, development, and pilot plant work conducted at the

395

Enforcement Letter, NEL-2011-03 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3 3 Enforcement Letter, NEL-2011-03 October 24, 2011 Issued to EnergySolutions, LLC related to a Radiological Contamination Event at the Separations Process Research Unit at the Knolls Atomic Power Laboratory The Office of Health, Safety and Security's Office of Enforcement and Oversight conducted an evaluation of the radiological contamination event at the Separations Process Research Unit (SPRU) Building H2 Tank Farm Weather Enclosure located at the Knolls Atomic Power Laboratory in Niskayuna, New York. On February 17, 2011, URS Washington Group International, Inc. (URS), the U.S. Department of Energy (DOE) prime contractor, reported an assessment of this event in the Occurrence Reporting and Processing System report EM---WGI-G2H2-2011-0001, Higher Than Expected Contamination Levels Inside H2 Tank Farm Weather Enclosure.

396

Enforcement Letter-Richland-07/06/1995  

Broader source: Energy.gov (indexed) [DOE]

6, 1995 6, 1995 NTS No. NTS-RL--WHC-PUREX-1995-0001 Westinghouse Hanford Corporation ATTN: Mr. Ronald J. Bliss [ ] P.O. Box 1970 MSIN: B3-04 Richland, WA 99350 Subject: Noncompliance with 10 CFR 830.120 (Quality Assurance Requirements) at the Plutonium Uranium Extraction Facility Gentlemen: This letter refers to the Department of Energy's (DOE) evaluation of Westinghouse Hanford Company's (WHC) investigation of an event that occurred between February 22-March 7, 1995, at the Plutonium Uranium Extraction Facility (PUREX) at DOE's Hanford site. The event, which involved the cutting of a highly contaminated canyon exhaust air sampling probe as part of waste disposal activities without adequate management controls, resulted in your decision to

397

Letter, September 21, 1998, Preliminary Notice of Violation  

Broader source: Energy.gov (indexed) [DOE]

1, 1998 1, 1998 Mr. Richard B. Wilkerson President and General Manager MK-Ferguson of Oak Ridge Company P.O. Box 2011 Oak Ridge, TN 37831 EA 98-08 Subject: Preliminary Notice of Violation NTS-ORO--MKFO-X 1 OCONSTRM-1997 -0001 Dear Mr. Wilkerson: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances associated with deficiencies in the administration of the MK-Ferguson of Oak Ridge Company (MK-F) bioassay program, during the time period between 1996- 1997 when it was a subcontractor to Lockheed Martin Energy Systems (LMES), the integrating contractor at the Oak Ridge site. The deficiencies in the bioassay program resulted in the failure, on multiple occasions over a period of close to two years, to identify significant intakes of radioactive material by two workers. The exposures

398

Enforcement Letter-Richland-09/22/1995  

Broader source: Energy.gov (indexed) [DOE]

2, 1995 2, 1995 NTS No. NTS-RL-WHC-BPLANT-1995-0001 Westinghouse Hanford Corporation ATTN: D.J. Swaim [ ] P.O. Box 1970 MSIN: B3-51 Richland, WA 99352 Dear Sirs: Subject: Noncompliance with 10 CFR 830.120 (Quality Assurance Requirements) at B Plant/Waste Encapsulation and Storage Facility This letter refers to the Department of Energy's (DOE) evaluation of Westinghouse Hanford Company's (WHC) report of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Requirements) at the Hanford B Plant/Waste Encapsulation Facility (WESF). These potential noncompliances were identified by WHC on May 8, 1995, during a self-initiated comprehensive assessment of the facilities Operational Safety Requirements (OSR) program and reported to DOE on May 24, 1995.

399

Enforcement Letter, WEL-2013-01 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

WEL-2013-01 WEL-2013-01 Enforcement Letter, WEL-2013-01 May 29, 2013 Issued to Los Alamos National Security, LLC, related to Worker Beryllium Exposure during Machining at the Los Alamos National Laboratory's Beryllium Technology Facility The Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated the circumstances surrounding a work evolution performed at Los Alamos National Laboratory (LANL) Technical Area 3, Building 141, Beryllium Technology Facility (BTF), on July 11, 2012. The work evolution resulted in a worker exposure to beryllium in excess of the Department of Energy (DOE) action level of 0.2 micrograms per cubic meter for an 8-hour, time-weighted average. Los Alamos National Security, LLC (LANS), which manages and operates LANL under a contract with the National

400

Enforcement Letter, Los Alamos National Laboratory - January 17, 1997 |  

Broader source: Energy.gov (indexed) [DOE]

January 17, January 17, 1997 Enforcement Letter, Los Alamos National Laboratory - January 17, 1997 January 17, 1997 Issued to the University of California related to Radiological Worker Training Deficiencies at the Los Alamos National Laboratory On December 4, 1996, the referenced potential noncompliance was reported to DOE by Los Alamos National Laboratory (LANL). The report describes an assessment conducted by LANL after a determination was made that at least nine employees at Building TA-55 had not received radiological worker training in accordance with the requirements of 10 CFR 835. The issue was initially raised by DOE/LAAO and the facility Price-Anderson Amendments Act (PAAA) coordinator conducted a preliminary review. Based on that assessment, the coordinator decided to report the

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Letter Report on Metallurgical Examination of the High Fluence RPV  

Broader source: Energy.gov (indexed) [DOE]

Report on Metallurgical Examination of the High Fluence RPV Report on Metallurgical Examination of the High Fluence RPV Specimens From the Ringhals Nuclear Reactors Letter Report on Metallurgical Examination of the High Fluence RPV Specimens From the Ringhals Nuclear Reactors Regulations which govern the operation of commercial nuclear power plants require conservative margins of fracture toughness, both during normal operation and under accident scenarios. In the irradiated condition, the fracture toughness of the RPV may be severely degraded, with the degree of toughness loss dependent on the radiation sensitivity of the materials. As stated in previous progress reports, the available embrittlement predictive models, e.g. [1], and our present understanding of radiation damage are not fully quantitative, and do not treat all potentially significant variables

402

Enforcement Letter, WEL-2013-02 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 2 Enforcement Letter, WEL-2013-02 July 30, 2013 Issued to Wastren Advantage, Inc. related to the Loss of Supplied Breathing Air in the Box Breakdown Area of the Transuranic Waste Processing Center located in Oak Ridge, Tennessee The U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated the facts and circumstances surrounding a loss of breathing air within the Box Breakdown Area (BBA) of the Transuranic Waste Processing Center (TWPC), which led to the expedited egress of two workers in supplied-air suits and one worker in a supplied-air hood. Wastren Advantage, Inc. (WAI) manages and operates the TWPC, located in Oak Ridge, Tennessee, under a contract with DOE and is subject to the provisions of DOE's Nuclear Safety Management rule

403

Enforcement Letter-Oakland-08/22/1996  

Broader source: Energy.gov (indexed) [DOE]

Dr. Robert W. Kuckuck Dr. Robert W. Kuckuck [ ] Lawrence Livermore National Laboratory P.O. Box 8078, L-001 Livermore, CA 94551 Re: Noncompliance Report NTS-SAN--LLNL-LLNL-1996-0002 Dear Dr. Kuckuck: This letter refers to the Department of Energy's (DOE) evaluation of Lawrence Livermore National Laboratory's (LLNL) report of a potential noncompliance with the requirements of 10 CFR 835 (Occupational Radiation Protection). This potential noncompliance involved the failure to complete required radiological worker retraining for 49 percent of LLNL's approximately 700 radiological workers. The training issue was initially identified on May 6, 1996, by LLNL during a routine review of the Chemistry and Materials Science deficiency tracking system when the administrative supervisor discovered that four individuals were not current in

404

Enforcement Letter, NEL-2013-02 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 2 Enforcement Letter, NEL-2013-02 February 12, 2013 The Office of Health, Safety and Security' s Office of Enforcement and Oversight conducted an evaluation of the deficiencies at the Los Alamos Neutron Science Center (LANSCE) described in the Los A lamos National Security, LLC (LANS) Noncomplia nce Tracking System (NTS) report NTS --LASO-LANS-LANL-2012-0018, LANSCE Contamination Event, dated September 10, 2012. Our evaluation included a review of the Federal accident investigation report, Accident Investigation into Contamination at the Los Alamos Neutron Science Center on or about August 21, 2012, dated September 2012; the associated corrective action plan; and discussions with site personnel. The NTS report documents a series of deficiencies at LANSCE that resulted

405

Inspection Letter Report: INS-L-09-05  

Broader source: Energy.gov (indexed) [DOE]

F 1 F 1 3 2 5 8 (8-89) EFCi (07-90) United States Government Department of Energy memorandum DATE. May 6, 2009 =PLY TO ATIT OF. IG-40 SUBJECT Letter Report on "Selected Aspects of the Department of Energy's Activities Involving the Foreign Intelligence Surveillance Act," INS-L-09-05 (S09IS0 14) TO. Director, Office of Intelligence and Counterintelligence This report provides the results of our review of selected aspects of the Foreign Intelligence Surveillance Act activities of the Department of Energy's Office of Intelligence and Counterintelligence. BACKGROUND In conjunction with the Department of Energy's (DOE'S) role as part of the U.S. intelligence community, the Office of Intelligence and Counterintelligence (IN) provides technical intelligence analyses on all aspects of foreign nuclear weapons, nuclear

406

Enforcement Letter, WEL-2011-01 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1-01 1-01 Enforcement Letter, WEL-2011-01 October 24, 2011 Issued to Brookhaven Science Associates, LLC, related to a Worker Injury that occurred during Tree Cutting Operations at the Brookhaven National Laboratory The Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated a worker injury that occurred at the Brookhaven National Laboratory (BNL) on March 3, 2011, when a BNL building and grounds utility worker was cutting a tree with a chainsaw while elevated 20 feet above ground in an aerial lift. An approximately eight foot long, 18-inch diameter, 520-pound section of tree trunk fell unexpectedly toward the worker and compressed the worker's right arm against the top railing of the aerial lift basket. The worker underwent surgery for the injuries, was hospitalized for more

407

Inspection Letter Report: INS-L-09-03  

Broader source: Energy.gov (indexed) [DOE]

DATE March 16. 2009 DATE March 16. 2009 REPLY TO ATTN OF. IG-40 SUBJECT Letter Report on "Y- 12 National Security Complex Accountable Classified Removable Electronic Media Program," INS-L-09-03 (S091S008) TO Manager, Y-12 Site Ortice This is to advise you of the results of an Office of Inspector General inspection 01 accountable classified removable electronic media (ACREM) at the National Nuclear Security Administration's Y-12 National Security Complex (Y-12). BACKGROUND Y-12 is responsible Cor ensuring the safety and reliability of the Nation's nuclear weapon stockpile and handles and stores some of the Nation's most sensitive information. Y-12 is managed and operated by Babcock and Wilcox Technical Services Y- 12, LLC, and the Y-12 Site Ocfice oversees this contract.

408

Enforcement Letter-Oakland-05/28/1997  

Broader source: Energy.gov (indexed) [DOE]

1997 1997 Dr. Charles V. Shank [ ] University of California Lawrence Berkeley National Laboratory One Cyclotron Road Berkeley, CA 94720 Subject: Noncompliance Report NTS-SAN-LBL-EHS-1997-0001 Dear Dr. Shank: This letter addresses the Department of Energy's (DOE) evaluation of Lawrence Berkeley National Laboratory's (LBNL) report of a potential noncompliance with the requirements of 10 CFR 835. This potential noncompliance involved the dismissal of the site As Low As Reasonably Achievable (ALARA) Committee in January 1996. This action was contrary to the commitments made in the Lawrence Berkeley Radiation Protection Program (RPP). The matter was initially reported to DOE in an anonymous complaint to the Oakland Operations Office and was placed into the Noncompliance Tracking System by LBNL on March 24,1997.

409

Letter Report: INS-L-09-01  

Broader source: Energy.gov (indexed) [DOE]

Wasi-lington, DC 20585 Wasi-lington, DC 20585 M E . h ~ l O ~ W ~ h ~ FC)XX. 'Hr.I&;<4.CTwpEf UTY SECRETARY S IJX33ECIT: IXFBWMAJllj: Letter Report on 1nspecti.on of "Depament of Ex~ergy ~itivities hvolving the 'President's Surveillance Program" (INS-L-09-01, in spec ti ax^ No. SOSHSO12) 'X'he Foreign Intelligeiice Su~-%leilBanc,x Act of 1978 (Act), ameridetl on July 10, 2008, requireti Lktt Intelligence Community Inspectors Generd retriew specified aspects c 9 f their respective agencies' parti.cipati.on in the President's Surveillance Program. The Act defined the Program as "the inteBllgen.ce activity inarolving :comuralcations that was authorized by the I>resider~t during the period beginniilg on September 1 I, 2001, w.d endirrg on Jmuay 17, 2007.9' The Depmx~eni

410

Microsoft Word - Kucman Intervention Letter Sept 17 2013  

Broader source: Energy.gov (indexed) [DOE]

17, 2013 17, 2013 Electronic Filing Christopher Lawrence Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Christopher.Lawrence@hq.doe.gov RE: Petition by Mr. Taras Kucman to intervene in the matter of Northern Pass Transmission LLC's Amended Presidential Permit Application (PP-371) Submitted July 1, 2013. Dear Mr. Lawrence: Please find enclosed my petition to intervene in this matter. I hereby certify that I served copies of this letter and the enclosed petition by Overnight Federal Express today to each of the following: Anne Bartosewicz Mary Anne Sullivan Northeast Utilities Hogan Lovells, LLP 107 Selden Street 555 13 th Street, NW Berlin, CT 07037 Washington, DC 20004

411

Enforcement Letter, NEL-2012-01 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-01 2-01 Enforcement Letter, NEL-2012-01 February 28, 2012 Issued to Washington River Protection Solutions, LLC, related to a positive Unreviewed Safety Question involving the Tank Farm Waste Transfer System at the Hanford Site The Office of Health, Safety and Security's Office of Enforcement and Oversight evaluated a positive Unreviewed Safety Question (USQ) identified by Washington River Protection Solutions, LLC (WRPS) involving a discrepancy in the Tank Farm waste transfer system design temperature, unanalyzed freezing during active waste transfer, and unanalyzed potential failure of relief valves due to solids precipitation. WRPS concluded that the American Society of Mechanical Engineers (AS ME) code B31.3 analysis of the safety significant waste transfer piping for

412

Audit Letter Report: INS-L-07-05  

Broader source: Energy.gov (indexed) [DOE]

Department of Energy Department of Energy memorandum DATE February 2, 2007 REPLY TO A T ~ N O F IG-40 SUBJECT: Letter Report on "Alleged Loss or Theft of Personally Identifiable Infonnation at Pantex," INS-L-07-05 (S06IS037) TO. Manager, Pailtex Site Office This is to advise you of the results of an Office of Inspector General (OIG) inspection of an alleged loss or theft of personally identifiable information at the National Nuclear Security Administration's (NNSA's) Pantex Plant. BACKGROUND Under the Immigration Reform and Control Act of 1986, as amended by the Immigration and Nationality Act, all United States (U.S.) employers are required to obtain and retain information concerning each employee's eligibility to work in the U.S. The information to be collected generally consists of the employee's social security number, address, date of

413

Resource Letter: SM-1: The standard model and beyond  

Science Journals Connector (OSTI)

This Resource Letter provides a guide to literature on the standard model of elementary particles and possible extensions. In the successful theory of quarks and leptons and their interactions important questions remain such as the mechanism of electroweak symmetry breaking the origin of quark and lepton masses the source of the baryon asymmetry of the Universe and the makeup of its matter and energy density. References are cited for quarks and leptons gauge theories color and chromodynamics weak interactions electroweak unification CP violation dynamics of heavy quarks Higgs bosons precision electroweak measurements supersymmetry dynamical electroweak symmetry breaking composite quarks and leptons grand unification and extended gauge groups string theories large extra dimensions neutrino masses cosmic microwave background radiation dark matter dark energy accelerator facilities and non-accelerator experiments.

Jonathan L. Rosner

2003-01-01T23:59:59.000Z

414

Resource Letter PBM-1: Physics of biomolecular machines  

Science Journals Connector (OSTI)

All living creatures are made of cells. The cell is the structural and functional unit of life. This Resource Letter serves as a guide to the literature on nano-machines which drive not only intracellular movements but also motility of the cell. These machines are usually proteins or macromolecular assemblies that require appropriate fuel for their operations. Although traditionally these machines were subjects of investigation in biology and biochemistry increasing use of the concepts and techniques of physics in recent years have contributed to the quantitative understanding of the fundamental principles underlying their operational mechanisms. The possibility of exploiting these principles for the design and control of artificial nanomachines has opened up a new frontier in the bottom-up approach to nanotechnology.

Debashish Chowdhury

2009-01-01T23:59:59.000Z

415

Letter: Mission, Objectives & Scope of the Site Specific Advisory Board |  

Broader source: Energy.gov (indexed) [DOE]

Mission, Objectives & Scope of the Site Specific Advisory Mission, Objectives & Scope of the Site Specific Advisory Board Letter: Mission, Objectives & Scope of the Site Specific Advisory Board From: Assistant Secretary, Jessie H. Roberson (EM-1) To: SSAB Members (T. Martin, J. Beirer, M. Wilson, P. Claire, J. Brannon, D. Mosby, B. Tanner, V. Holm, W. Waters) This letter reiterates the mission, objectives, and scope of the local Site Specific Advisory Boards (SSABs) associated with nine Department of Energy (DOE) environmental clean-up sites, and restates Assistant Secretary, Jessie H. Roberson's commitment to support the Boards activities. Roberson Letter - June 25, 2003 More Documents & Publications Letter: Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs

416

Preparing and Submitting a Phase I Letter of Intent | U.S. DOE Office of  

Office of Science (SC) Website

and Submitting a Phase I Letter of Intent and Submitting a Phase I Letter of Intent Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) SBIR/STTR Home About Funding Opportunity Announcements (FOAs) Applicant and Awardee Resources Preparing and Submitting a Phase I Letter of Intent Preparing a DOE SBIR/STTR Phase I Grant Application Useful Documents for Awardees Commercialization Assistance Other Resources Awards SBIR/STTR Highlights Reporting Fraud Contact Information Small Business Innovation Research and Small Business Technology Transfer U.S. Department of Energy SC-29/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-5707 F: (301) 903-5488 E: sbir-sttr@science.doe.gov More Information » Applicant and Awardee Resources Preparing and Submitting a Phase I Letter of Intent

417

Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of  

Broader source: Energy.gov (indexed) [DOE]

Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Questions concerning this policy flash should be directed to Robert M. Myers, Director, Contractor Human Resources Policy Division (MA-612) at (202) 287-1584 or robert.myers@hq.doe.gov. Policy Flash - DOE O 350 1.pdf Consolidated Model H-Clause 06-27-13.pdf Acquisition Letter - DOE O 350 1 6-27-13.pdf More Documents & Publications GAO-04-539 Department of Energy: Certain Postretirement Benefits for Contractor Employees Are Unfunded and Program Oversight Could Be Improved Chapter 30 - Cost Accounting Standards Administration

418

Enforcement Letter, Kaiser-Hill Company, L.L.C. - July 21, 1998 |  

Broader source: Energy.gov (indexed) [DOE]

1, 1998 1, 1998 Enforcement Letter, Kaiser-Hill Company, L.L.C. - July 21, 1998 This letter refers to the Department of Energy's (DOE) evaluation of potential noncompliances with the requirements of 10 CFR 830.120 (Quality Assurance Rule). The potential noncompliances involved inadequate implementation of work controls, specifically failure of workers to perform required surveillance of the Fire Protection System. The failure to fully perform the required surveillance was identified by Safe Sites of Colorado (SSOC) on June 2, 1997, and reported to DOE in the subject Noncompliance Tracking System report on June 26, 1997. Enforcement Letter, Kaiser-Hill Company, L.L.C. - July 21, 1998 More Documents & Publications Enforcement Letter, Kaiser-Hill Company, L.L.C. - July 20, 1998

419

Interim Transmittal Letter dated July 27 2005 | U.S. DOE Office of Science  

Office of Science (SC) Website

Interim Transmittal Letter dated July 27 2005 Interim Transmittal Letter dated July 27 2005 High Energy Physics Advisory Panel (HEPAP) HEPAP Home Meetings Members .pdf file (20KB) Charges/Reports Charter .pdf file (44KB) HEP Committees of Visitors HEP Home Charges/Reports Interim Transmittal Letter dated July 27 2005 Print Text Size: A A A RSS Feeds FeedbackShare Page July 27, 2005 Harold T. Shapiro, Chair Sally Dawson, Vice Chair Elementary Particle Physics 2010 Committee The National Academies 500 Fifth Street, NW Washington, D.C. 20001 Dear Harold and Sally, Thank you again for your letter of March 15, 2005 to me as Chair of the High Energy Physics Advisory Panel (HEPAP) and for the opportunity to answer your questions about the International Linear Collider (ILC) along the broad themes of 1) the physics case, 2) the research and development

420

Inspection Letter Report: INS-L-11-01 | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Inspection Letter Report: INS-L-11-01 Inspection Letter Report: INS-L-11-01 Inspection Letter Report: INS-L-11-01 November 17, 2010 Letter Report on "Inspection of Allegations Relating to Irregularities in the Human Reliability Program and Alcohol Abuse within the Office of Secure Transportation The Office of Inspector General received a series of allegations concerning violations of the Human Reliability Program (HRP) and alcohol abuse within the Office of Secure Transportation (OST). Specifically, it was alleged that incidents involving violations of the HRP were not reported as required, and that the HRP was not administered in a fair and consistent manner. It was also alleged that alcohol abuse was a problem within OST and that alcohol-related incidents involving current Agents assigned to various

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

EERE-2010-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE 0-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors Rule 15 July 2013. EERE-2010-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors Rule 15 July 2013. This memorandum memorializes a communication between DOE staff and members of the NEMA Motor and Generator Section in connection with this proceeding. NEMA thanks the DOE for the opportunity to conduct training for DOE staff and its consultants on July 15th, 2013 which illustrated the different types of motors, motor construction theory and motor applications by type. It is our hope that better understanding of motor types and construction will assist the Department and its consultants with the discharge of their duties. EERE-2010-BT-STD-0027 Ex Parte Letter NEMA Motor Training re DOE Motors

422

Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of  

Broader source: Energy.gov (indexed) [DOE]

2 Acquisition Letter 09 - Revision of Department 2 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Questions concerning this policy flash should be directed to Robert M. Myers, Director, Contractor Human Resources Policy Division (MA-612) at (202) 287-1584 or robert.myers@hq.doe.gov. Policy Flash - DOE O 350 1.pdf Consolidated Model H-Clause 06-27-13.pdf Acquisition Letter - DOE O 350 1 6-27-13.pdf More Documents & Publications Chapter 30 - Cost Accounting Standards Administration OPAM Policy Acquisition Guides GAO-04-539 Department of Energy: Certain Postretirement Benefits for Contractor Employees Are Unfunded and Program Oversight Could Be Improved

423

Inspection Letter Report: INS-L-11-01 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Inspection Letter Report: INS-L-11-01 Inspection Letter Report: INS-L-11-01 Inspection Letter Report: INS-L-11-01 November 17, 2010 Letter Report on "Inspection of Allegations Relating to Irregularities in the Human Reliability Program and Alcohol Abuse within the Office of Secure Transportation The Office of Inspector General received a series of allegations concerning violations of the Human Reliability Program (HRP) and alcohol abuse within the Office of Secure Transportation (OST). Specifically, it was alleged that incidents involving violations of the HRP were not reported as required, and that the HRP was not administered in a fair and consistent manner. It was also alleged that alcohol abuse was a problem within OST and that alcohol-related incidents involving current Agents assigned to various

424

Enforcement Letter, CH2M Hill Hanford Group, Inc. - April 24...  

Broader source: Energy.gov (indexed) [DOE]

Inc. - April 24, 2001 Enforcement Letter, CH2M Hill Hanford Group, Inc. - April 24, 2001 April 24, 2001 Issued to CH2M Hill Hanford Group, Inc., related to Nuclear Safety...

425

Inspection Letter Report: INS-L-09-07 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

7 Inspection Letter Report: INS-L-09-07 August 27, 2009 Allegations of Improper Hanford Workers' Compensation Payments (INS-L-09-07, S09IS027) This is to advise you of the results...

426

Audit Letter Report: OAS-L-09-03 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

(NNSA's) Pantex Plant is responsible for the assembly and dismantlement of nuclear weapon systems. Topic: National Security and Safety Audit Letter Report: OAS-L-09-03 More...

427

Enforcement Letter, CH2M Oak Ridge, LLC - SEL-2012-01 | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Oak Ridge, LLC - SEL-2012-01 Enforcement Letter, CH2M Oak Ridge, LLC - SEL-2012-01 May 4, 2012 Issued to URS CH2M Oak Ridge, LLC, related to a Security Incident involving the...

428

POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non...  

Energy Savers [EERE]

Business Systems Clauses for Section H - Earned Value Management Clause POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and Operating (Non-M&O)...

429

Acquisition Letter 2009-03 Acquisition Planning-Extending A Management...  

Office of Environmental Management (EM)

AcquisitionLetter2009dash03Rev1.pdf More Documents & Publications Subject: Cost and Price Analysis Microsoft Word - Policy Flash 2010-67 Attachment 1 Subject: Cost and Price...

430

Letter to Congress RE: Office of Civilian Radioactive Waste Management's Annual Financial Report  

Broader source: Energy.gov [DOE]

The following document is a letter from the Secretary of Energy to the Honorable Joseph R. Biden regardingthe U.S. Department of Energy's Office of Civilian Radioactive Waste Management's Annual...

431

Audit Letter Report: OAS-L-07-01 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

OAS-L-07-01 Audit Letter Report: OAS-L-07-01 October 12, 2006 The Bonneville Power Administration's Conservation and Renewables Discount Conservation and Rate Credit Programs Audit...

432

Letter-based speech synthesis Oliver Watts, Junichi Yamagishi, Simon King  

E-Print Network [OSTI]

Letter-based speech synthesis Oliver Watts, Junichi Yamagishi, Simon King Centre for Speech Technology Research, University of Edinburgh, UK O.S.Watts@sms.ed.ac.uk jyamagis@inf.ed.ac.uk Simon

Edinburgh, University of

433

Acquisition Letter 2015-02 - Revision of DOE O 350.1 and Special...  

Office of Environmental Management (EM)

(DOE) Order 350.1 and Special H Clause SUMMARY: The purpose of Acquisition Letter (AL) 2015-02 is to communicate the revisions to Chapter VII, Risk Management and Insurance...

434

LETTER A global quantitative synthesis of local and landscape effects on wild bee pollinators in agroecosystems  

E-Print Network [OSTI]

, diversified farming system, ecologically scaled landscape index, ecosystem ser- vices, farm management, habitat fragmentation, landscape structure, organic farming, pollinators. Ecology Letters (2013) 1 Urban provide essential pollination services that are potentially affected both by local farm management

Danforth, Bryan Nicholas

435

Audit Letter Report: OAS-L-09-17 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

7 Audit Letter Report: OAS-L-09-17 September 28, 2009 Audit of Mixed Low-Level Waste Disposal within the Department of Energy Environmental cleanup of contaminated nuclear weapons...

436

Letter Report: INS-L-10-02 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

INS-L-10-02 Letter Report: INS-L-10-02 July 28, 2010 Allegations Involving the National Nuclear Security Administration's National Security Vault One of the primary missions of...

437

LETTER Community ecology theory predicts the effects of agrochemical mixtures on aquatic biodiversity and ecosystem  

E-Print Network [OSTI]

LETTER Community ecology theory predicts the effects of agrochemical mixtures on aquatic experiment to examine the effects of pairwise agrochemical mixtures [fertiliser, herbicide (atrazine. As postulated, the responses of biodiversity and ecosystem properties to agrochemicals alone and in mixtures

Lajeunesse, Marc J.

438

Program Day Date Time Room Resumes and Cover Letters Wednesday 9/3 4 p.m. 224 WPU  

E-Print Network [OSTI]

Program Day Date Time Room Resumes and Cover Letters Wednesday 9/3 4 p.m. 224 WPU Searching and Applying Friday 9/5 11 a.m. 224 WPU Networking and Social Media Friday 9/5 Noon 224 WPU Resumes and Cover Letters Tuesday 9/9 4 p.m. 540 WPU Resumes and Cover Letters Monday 9/15 4 p.m. 224 WPU Resumes and Cover

Benos, Panayiotis "Takis"

439

J. Phys.: Condens. Matter 2 (1990) 9221-9226. Printed in the UK LETTER TO THE EDITOR  

E-Print Network [OSTI]

#12;9222 Letter to the Editor t'(a) tZ Figure 1. Successive spin configurations: (a) Planar phase, H

Chubukov, Andrey V.

440

LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BNL  

SciTech Connect (OSTI)

5098-LR-01-0 -LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY

P.C. Weaver

2010-10-22T23:59:59.000Z

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

HOW TO WRITE A COVER LETTER Think of a cover letter as your opportunity to introduce yourself, your resume, your skills and  

E-Print Network [OSTI]

resume, your skills and experiences, and your interest in a job to a potential employer. You should almost never send a resume without one. Your cover letter and resume are often a company's first not to restate everything on your resume, you should highlight and briefly expand upon those elements of your

Yates, Andrew

442

Electrochemical and Solid-State Letters, 3 (7) (2000), LETTERS ONLINE Ven1 S1099-0062(00)02-074-5 CCC: $7.00 The Electrochemical Society, Inc.  

E-Print Network [OSTI]

Electrochemical and Solid-State Letters, 3 (7) (2000), LETTERS ONLINE Ven1 S1099 used as the cathode in rechargeable lithium batteries, is well suited for the rapid removal factor that deter- mines the rate at which a battery can be charged and discharged. With increasing

Ceder, Gerbrand

443

IEEE PHOTONICS TECHNOLOGY LETTERS, VOL. 15, NO. 1, JANUARY 2003 81 Tunable Microfluidic Optical-Fiber Devices Based on  

E-Print Network [OSTI]

IEEE PHOTONICS TECHNOLOGY LETTERS, VOL. 15, NO. 1, JANUARY 2003 81 Tunable Microfluidic Optical. Krupenkine, K. Baldwin, and J. A. Rogers Abstract--This letter introduces a class of tunable microfluidic pressure pumping and thermo-optic tuning of microfluidic plugs in microstructured, or "holey," fiber yields

Rogers, John A.

444

Internship Opportunities with Oregon's Congressional Delegation To apply: submit resume, writing sample, cover letter and three references  

E-Print Network [OSTI]

Internship Opportunities with Oregon's Congressional Delegation To apply: submit resume, writing://merkley.senate.gov/services/internships/ To apply: submit cover letter, resume, writing sample (://wyden.senate.gov/constituents/internship.cfm To apply: submit cover letter, resume and application (available online) David Wu (OR-1) Application

Escher, Christine

445

Letter: Progress in Implementing a Direct DOE Relationship & Funding for  

Broader source: Energy.gov (indexed) [DOE]

Progress in Implementing a Direct DOE Relationship & Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs Letter: Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs From: Assistant Secretary, Jessie H. Roberson (EM-1) To: J. Bierer, T. Martin, M. Wilson, C. Phillips, J. Brannon, D. Mosby, B. Tanner, V. Holm, W. Waters - please see document for full distribution list, including SSAB Administrators, Designated Deputy Federal Officers, SSAB Federal Coordinators and Office Site Managers The letter is in regards to progress made to date in implementing a direct DOE relationship and funding for the EM Site Specific Advisory Boards. Roberson Letter - December 22, 2003 More Documents & Publications Memorandum: Revised Guidance for the Office of Environmental Management

446

Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for  

Broader source: Energy.gov (indexed) [DOE]

Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified Workers Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified Workers Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe.gov. Policy Flash_Nondisplacement.pdf SIGNED_classdeviation970.5244-1.pdf AL nondisplacement of qualified workers.pdf More Documents & Publications Policy Flash 2013-79 Professional and Consultant service cost (FAR 31.205-33) Policy Flash 2013-41 Contracts Periods of Performance Exceeding 5 Years Policy Flashes FY 2013

447

Enforcement Letter, Kaiser-Hill Company, L.L.C. - July 20, 1998 |  

Broader source: Energy.gov (indexed) [DOE]

0, 1998 0, 1998 Enforcement Letter, Kaiser-Hill Company, L.L.C. - July 20, 1998 July 20, 1998 Issued to Kaiser-Hill Company, LLC related to Recurring Weaknesses in Implementing Quality Assurance Rule Requirements at the Rocky Flats Environmental Technology Site This letter refers to the Department of Energy's (DOE) evaluation of noncompliances reported in four Noncompliance Tracking System (NTS) entries, identified in the subject line above. The four NTS reports were submitted between September 24, 1997, and March 3, 1998. The reports identified potential noncompliances with requirements of 10 CFR 830.120 (Quality Assurance Rule) and 10 CFR 835 (Radiation Protection Rule). Enforcement Letter, Kaiser-Hill Company, L.L.C. - July 20, 1998 More Documents & Publications

448

Letter Report: INS-L-09-01 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Letter Report: INS-L-09-01 Letter Report: INS-L-09-01 Letter Report: INS-L-09-01 November 6, 2008 Department of Energy Activities Involving the President's Surveillance Program The Foreign Intelligence Surveillance Act of 1978 (Act), amended on July 10, 2008, required that Intelligence Community Inspectors General review specified aspects of their respective agencies' participation in the President's Surveillance Program. The Act defined the Program as "the intelligence activity involving communications that was authorized by the President during the period beginning on September 11, 2001, and ending on January 17, 2007' The Department of Energy is a member of the Intelligence Community. As such, we initiated an inspection to determine if the Department participated in the Program and, if so, to report on activities

449

Enforcement Letter, CH2M Hill Hanford Group, Inc. - April 24, 2001 |  

Broader source: Energy.gov (indexed) [DOE]

CH2M Hill Hanford Group, Inc. - April 24, 2001 CH2M Hill Hanford Group, Inc. - April 24, 2001 Enforcement Letter, CH2M Hill Hanford Group, Inc. - April 24, 2001 April 24, 2001 Enforcement Letter issued to CH2M Hill Hanford Group, Inc., related to Nuclear Safety Management at the Hanford Site Tank Farms This letter refers to a recent investigation by the Department of Energy (DOE), regarding potential noncompliances with the requirements of 10 CFR 830, "Nuclear Safety Management," occurring at the Hanford Tank Farms. The investigation reviewed three issues that were reported into the Noncompliance Tracking System (NTS) by CH2M Hill Hanford Group, Inc. Two of the NTS reports involve the failure to perform the Technical Safety Requirement (TSR) for [ ] gas monitoring. The initial potential noncompliance occurred in January 2000, in which a Zip Cord was installed

450

Letter: Progress in Implementing a Direct DOE Relationship & Funding for  

Broader source: Energy.gov (indexed) [DOE]

Progress in Implementing a Direct DOE Relationship & Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs Letter: Progress in Implementing a Direct DOE Relationship & Funding for the EMSSABs From: Assistant Secretary, Jessie H. Roberson (EM-1) To: J. Bierer, T. Martin, M. Wilson, C. Phillips, J. Brannon, D. Mosby, B. Tanner, V. Holm, W. Waters - please see document for full distribution list, including SSAB Administrators, Designated Deputy Federal Officers, SSAB Federal Coordinators and Office Site Managers The letter is in regards to progress made to date in implementing a direct DOE relationship and funding for the EM Site Specific Advisory Boards. Roberson Letter - December 22, 2003 More Documents & Publications Memorandum: Revised Guidance for the Office of Environmental Management

451

Enforcement Letter, CH2M Hill Hanford Group, Inc. - April 24, 2001 |  

Broader source: Energy.gov (indexed) [DOE]

Inc. - April 24, 2001 Inc. - April 24, 2001 Enforcement Letter, CH2M Hill Hanford Group, Inc. - April 24, 2001 April 24, 2001 Enforcement Letter issued to CH2M Hill Hanford Group, Inc., related to Nuclear Safety Management at the Hanford Site Tank Farms This letter refers to a recent investigation by the Department of Energy (DOE), regarding potential noncompliances with the requirements of 10 CFR 830, "Nuclear Safety Management," occurring at the Hanford Tank Farms. The investigation reviewed three issues that were reported into the Noncompliance Tracking System (NTS) by CH2M Hill Hanford Group, Inc. Two of the NTS reports involve the failure to perform the Technical Safety Requirement (TSR) for [ ] gas monitoring. The initial potential noncompliance occurred in January 2000, in which a Zip Cord was installed

452

Letter Responding to Requests for Information Made by Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Responding to Requests for Information Made by Department of Responding to Requests for Information Made by Department of Energy (DOE) Personnel About Restarting Potomac River After a Shutdown. Letter Responding to Requests for Information Made by Department of Energy (DOE) Personnel About Restarting Potomac River After a Shutdown. Docket No. EO-05-01: This letter responds to requests for information made by Department of Energy (DOE) personnel at our meeting about how to restart Potomac River as quickly as possible after a shutdown. Letter Responding to Requests for Information Made by Department of Energy (DOE) Personnel About Restarting Potomac River After a Shutdown. More Documents & Publications Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating

453

Audit Letter Report: OAS-L-08-07 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Letter Report: OAS-L-08-07 Letter Report: OAS-L-08-07 Audit Letter Report: OAS-L-08-07 February 21, 2008 Analysis of Open Office of Inspector General Recommendations Analysis of Open Office of Inspector General RecommendationsIn December 2007, Congressman Henry A. Waxman, Chairman of the Committee on Oversight and Government Reform, requested that the Office of Inspector Gencral examine information related to recommendations issued after January 1,200 1, that had not been implemented by the Departtilent. This was part of a governrnent-wide effort. In response, we tnitiatcd a review to collect the relevant data pertaining to open recommendations Issued between January 1, 2001. and September 30,2007. Our objcctivc was to provide a broader analysts of the Department's audit resolution and follow-up process.

454

Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the  

Broader source: Energy.gov (indexed) [DOE]

Documenting Department of Energy Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan Docket No. EO-05-01: Letter documenting Department of Energy receipt of the Mirant Potomac River compliance plan, and informing Mirant that additional comments on the plan would be forthcoming. Docket No. EO-05-01: Letter Documenting Department of Energy Receipt of the Mirant Potomac River Compliance Plan More Documents & Publications Comments on Department of Energy's Emergency Order To Resume Limited Operation at Mirant's Potomac River Generating Station and Proposed Mirant Compliance Plan Motion for Leave to Answer and Answer of Potomac Electric Power Company

455

Letter from Elizabeth Chimento and Poul Hertel to the Federal Energy  

Broader source: Energy.gov (indexed) [DOE]

Elizabeth Chimento and Poul Hertel to the Federal Elizabeth Chimento and Poul Hertel to the Federal Energy Regulatory Commission Re: District of Columbia Public Service Commission Emergency Petition and Complaint Docket No. EL05-145-000 Letter from Elizabeth Chimento and Poul Hertel to the Federal Energy Regulatory Commission Re: District of Columbia Public Service Commission Emergency Petition and Complaint Docket No. EL05-145-000 Docket No. EO-05-01: Letter from Elizabeth Chimento and Poul Hertel to the Federal Energy Regulatory Commission Re: District of Columbia Public Service Commission Emergency Petition and Complaint Docket No. EL05-145-000 Letter from Elizabeth Chimento and Poul Hertel, Sullivan Environmental Consultants Review of Mirant Unit 1 Plan More Documents & Publications Review of the ENSR Report Titled "Update 1 to: A Dispersion Modeling

456

Audit Letter Report: OAS-RA-L-10-01 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Letter Report: OAS-RA-L-10-01 Letter Report: OAS-RA-L-10-01 Audit Letter Report: OAS-RA-L-10-01 April 6, 2010 The Department of Energy's Management of the NSLS-II Project The Department of Energy's (Department) Office of Science is currently constructing the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Laboratory (Brookhaven) in Upton, New York. The NSLS-II is designed to replace the existing National Synchrotron Light Source (NSLS), which began operations in 1982. Approximately 2,100 researchers utilize the NSLS each year for research in such areas as biology and medicine, chemistry and environmental sciences, physics, and materials science. Construction of the NSLS-II began in Fiscal Year (FY) 2009 and the facility is scheduled to begin operations in FY 2015.

457

Microsoft Word - AL 2010-07 Acquistion Letters Remaining in Effect May 2010 revision 1 June 2010  

Broader source: Energy.gov (indexed) [DOE]

No. AL 2010-07 Rev. 1 No. AL 2010-07 Rev. 1 Acquisition Regulation Date 06/01/2010 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the DOE and NNSA Senior Procurement Executives. Acquisition Letters (AL) that remain in effect are identified below. All other previously issued ALs have been superseded by a formal rule-making, incorporated into other guidance, and/or canceled. * * * * * * * * * * * * * * * * ACQUISITION LETTERS REMAINING IN EFFECT NUMBER DATE SUBJECT 93-4 04/07/1993 Displaced Workers Benefits Program 94-19 12/09/1994 Basic Labor Policies Fringe Benefits 95-06 06/28/1995 Personal Property Letter System 2000-09 11/11/2000 Source Selection Authority 2005-11 07/15/2005 Home Office Expenses for Management and

458

Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site  

SciTech Connect (OSTI)

This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, and 528.

Boehleke, R. F.

2014-05-06T23:59:59.000Z

459

Letter of Intent: Commercial Real Estate Developer/Owner | ENERGY STAR  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Letter of Intent: Commercial Real Estate Developer/Owner Letter of Intent: Commercial Real Estate Developer/Owner Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources

460

Acquisition Letter 2015-02- Revision of DOE O 350.1 and Special H Clause  

Broader source: Energy.gov [DOE]

Acquisition Letter 2015-02 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause The purpose of Acquisition Letter (AL) 2015-02 is to communicate the revisions to Chapter VII, Risk Management and Insurance Programs of DOE Order 350.1, Contractor Human Resource Management Programs (approved on September 30, 2014), and require Contracting Officers to modify applicable contracts no later than January 31, 2015, to include the new STRIPES Special H clause which contains requirements formerly included in the Contractor Requirements Document (CRD) of Chapter VII.

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Photovoltaic properties of GaAs:Be nanowire arrays  

SciTech Connect (OSTI)

Arrays of GaAs:Be nanowires are synthesized by molecular beam epitaxy on GaAs(111)B substrates. Prototypes of photovoltaic converters in which the grown nanowire arrays are used as active layers are produced by means of successive photolithography, etching, and metallization processes. Studying the photovoltaic properties of the fabricated structures using a solar radiation simulator demonstrates that the solarenergy conversion efficiency is about 0.1%. The value of the efficiency recalculated with the area occupied by the p-type nanowires on the surface of the n-type GaAs substrate taken into account amounts to 1.1%.

Bouravleuv, A. D.; Beznasyuk, D. V.; Gilstein, E. P. [Russian Academy of Sciences, Ioffe Physical-Technical Institute (Russian Federation); Tchernycheva, M.; Luna Bugallo, A. De; Rigutti, L. [University Paris Sud 11, Institut d'Electronique Fondamentale UMR CNRS 8622 (France); Yu, L. [CNRS, Laboratoire de Physique des Interfaces et des Couches Minces (LPICM), Ecole Polytechnique (France); Proskuryakov, Yu. [University of Liverpool, Stephenson Institute for Renewable Energy (United Kingdom); Shtrom, I. V.; Timofeeva, M. A. [Russian Academy of Sciences, St. Petersburg Academic University-Nanotechnology Research and Education Center (Russian Federation); Samsonenko, Yu. B.; Khrebtov, A. I.; Cirlin, G. [Russian Academy of Sciences, Ioffe Physical-Technical Institute (Russian Federation)

2013-06-15T23:59:59.000Z

462

Earth and Planetary Science Letters 381 (2013) 127137 Contents lists available at ScienceDirect  

E-Print Network [OSTI]

Direct Earth and Planetary Science Letters www.elsevier.com/locate/epsl Frictional strength and wear-rate of carbonate faults during high-velocity, steady-state sliding Yuval Boneh a,1 , Amir Sagy b , Ze'ev Reches a, a School of Geology and Geophysics, University of Oklahoma, Norman, OK 73019, United States b Geological

Ze'ev, Reches

463

Earth and Planetary Science Letters 390 (2014) 175185 Contents lists available at ScienceDirect  

E-Print Network [OSTI]

of materials such as (Mg, Fe)SiO3 perovskite and post-perovskite found in D . However, the thermal conductivity. Historically, estimates of thermal conductivities at the CMB from low pres- sure or low temperature experimentsDirect Earth and Planetary Science Letters www.elsevier.com/locate/epsl Variation of thermal conductivity

464

LETTER doi:10.1038/nature12267 Elastic energy storage in the shoulder and the  

E-Print Network [OSTI]

#12;LETTER doi:10.1038/nature12267 Elastic energy storage in the shoulder and the evolution of high elastic energy storage and release at the shoulder. These features first appear together approximately 2. Elastic energy storage has been shown to be an important source of poweramplification formanyhigh

Udgaonkar, Jayant B.

465

Volume 17 1, number 4 CHEMICAL PHYSICS LETTERS 10 August 1990 Sublimation versus fragmentation  

E-Print Network [OSTI]

Volume 17 1, number 4 CHEMICAL PHYSICS LETTERS 10 August 1990 Sublimation versus fragmentation in matrix-assisted laser desorption A. Vertes Department of Chemistry, University ofAntwerp (MA to potentially rapid destruction of the host matrix. Two separate mechanisms are considered, sublimation

Vertes, Akos

466

FDA Exemption Letter, 78EL-01DOE by LSSG for GOCG Facilities  

Broader source: Energy.gov [DOE]

Food and Drug Administration response to Department of Energy's request for clarification of the circumstances under which a DOE Government Owned Contractor Operated (GOCO) facility may be considered a laser manufacturer and subject to FDA laser manufacturer requirements and other points of interpretation of the FDA Exemption Letter, 78EL-01DOE (DOE exemption or exemption) by the LSSG for GOCG facilities.

467

2013 Year-end letter to members and friends of the Global WTERT Council  

E-Print Network [OSTI]

1 2013 Year-end letter to members and friends of the Global WTERT Council From: Prof. Nickolas Council and showed that in 2011 the U.S. generated a total of 389 million tons of MSW, of which 22 publications. 8. The Global WTERT Council (GWC) now consists of fourteen national groups. In 2013

468

GEOPHYSICAL RESEARCH LETTERS, VOL. ???, XXXX, DOI:10.1029/, A bootstrap algorithm for deriving the1  

E-Print Network [OSTI]

-squares method combined13 with a bootstrap algorithm. Given a particular set of archeomagnetic data14 associated;X - 4 THEBAULT AND GALLET: A BOOTSTRAP ALGORITHM 2. Fundamentals We have a discrete set of data fGEOPHYSICAL RESEARCH LETTERS, VOL. ???, XXXX, DOI:10.1029/, A bootstrap algorithm for deriving the1

Thébault, Erwan

469

Europhysics Letters PREPRINT Layering transitions for adsorbing polymers in poor sol-  

E-Print Network [OSTI]

Europhysics Letters PREPRINT Layering transitions for adsorbing polymers in poor sol- vents J a polymer in the presence of a sticky wall will bind (adsorb) onto the surface as the temperature is lowered of the monomers will be adsorbed onto the surface in the large length limit and the polymer behaves in a two

Rechnitzer, Andrew

470

Volume 79, number 3 CHEMICAL PHYSICS LETTERS 1 hfay1981 EFFECTS OF CONFORMATION AND SOLVENT POLARITY  

E-Print Network [OSTI]

Volume 79, number 3 CHEMICAL PHYSICS LETTERS 1 hfay1981 EFFECTS OF CONFORMATION AND SOLVENT for molecules in extended con- formations, producing solvated ion pairs without passing through the exciplex of this is the relatively slow rate for intramolecular exciplex forma- tion (ns) in A-(CH,),-D 0 00 0 CHp12cH2 - a- N/CH3

Eisenthal, Kenneth B.

471

446 SDSU General Catalog 2014-2015 OFFICES: Arts and Letters 417  

E-Print Network [OSTI]

-MAIL: mlauer@mail.sdsu.edu Faculty Faculty assigned to teach sustainability courses are drawn from the colleges at San Diego State University. The program is housed in the College of Arts and Letters. Program Director Studies) Offered by Sustainability Major in sustainability with the B.A. degree in liberal arts

Gallo, Linda C.

472

ACADEMIC TRAINING FOR J-1 STUDENTS -5 SAMPLE ADVISOR'S LETTER FOR ACADEMIC TRAINING  

E-Print Network [OSTI]

ACADEMIC TRAINING FOR J-1 STUDENTS - 5 SAMPLE ADVISOR'S LETTER FOR ACADEMIC TRAINING must Services FROM: Name Title RE: Recommendation for Academic Training for ___________________________ DATE ____________________________ ______________________________________________________. This student has an opportunity to pursue academic training with the employer indicated below. I have discussed

Mohan, Chilukuri K.

473

Regulatory Guidance Letter 86-10 SUBJECT: Special Area Management Plans (SAMPS)  

E-Print Network [OSTI]

Regulatory Guidance Letter 86-10 SUBJECT: Special Area Management Plans (SAMPS) DATE: October 2 the problems associated with the traditional case-by-case review. Developmental interests can plan the SAMP process as "a comprehensive plan providing for natural resource protection and reasonable coastal

US Army Corps of Engineers

474

Regulatory Guidance Letter 88-01 SUBJECT: Length of Public Notices  

E-Print Network [OSTI]

Regulatory Guidance Letter 88-01 SUBJECT: Length of Public Notices DATE: March 8, 1988 EXPIRES of the project. Normally, a vicinity map and plan view should be sufficient to provide this information notice should note that this material is available for review at the district office. Also, when

US Army Corps of Engineers

475

Regulatory Guidance Letter 90-04 SUBJECT: Water Quality Considerations (33 CFR  

E-Print Network [OSTI]

engineer (DE) of "other water quality aspects" that he should examine. 2. The DE can usually presumeRegulatory Guidance Letter 90-04 SUBJECT: Water Quality Considerations (33 CFR 320.4 (d) ) DATE of compliance with applicable effluent limitations and water quality standards will be conclusive with respect

US Army Corps of Engineers

476

LETTER doi:10.1038/nature10189 Oncogene-induced Nrf2 transcription promotes ROS  

E-Print Network [OSTI]

, and in human pancreatic cancer. Furthermore, genetic targeting of the Nrf2 path- way impairs K-RasG12D -inducedLETTER doi:10.1038/nature10189 Oncogene-induced Nrf2 transcription promotes ROS detoxification that responds to cellular stressors and is predominantly regulated by the transcription factor Nrf2 (also known

Cai, Long

477

Neuroscience Letters 405 (2006) 1923 Improving human ankle joint position sense using an  

E-Print Network [OSTI]

Neuroscience Letters 405 (2006) 19­23 Improving human ankle joint position sense using at the ankle joint. To address this objective, nine young healthy adults were asked to perform an active ankle subjects with supplementary information about the position of their matching ankle position relative

Payan, Yohan

478

LETTER doi:10.1038/nature12156 Signature of ocean warming in global fisheries catch  

E-Print Network [OSTI]

LETTER doi:10.1038/nature12156 Signature of ocean warming in global fisheries catch William W. L changes in sea surface temperature5 . This study shows that ocean warming has already affected global. Cheung1 , Reg Watson2 & Daniel Pauly3 Marine fishes and invertebrates respond to ocean warming through

Pauly, Daniel

479

LETTER doi:10.1038/nature09407 Global metabolic impacts of recent climate warming  

E-Print Network [OSTI]

LETTER doi:10.1038/nature09407 Global metabolic impacts of recent climate warming Michael E. Dillon and projected climate warming2,13,14 . Global warming is probably having profound and diverse effects phenology3,4 , community interactions5 , genetics3,6 and extinctions7 have been attributed to recent global

Huey, Raymond B.

480

Letters to Analytical Chemistry Silver Nanoparticles on a Plastic Platform for  

E-Print Network [OSTI]

Letters to Analytical Chemistry Silver Nanoparticles on a Plastic Platform for Localized Surface on plastics is described. The silver-nanopar- ticles-on-plastic sensor (SNOPS) was fabricated by chemi- cally modifying the surface of a common plastic, polyeth- yleneterephthalate

Brolo, Alexandre G.

Note: This page contains sample records for the topic "letters 111b 111b" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

LETTER Communicated by Donald Spencer Wide-Band Information Transmission at the Calyx of Held  

E-Print Network [OSTI]

LETTER Communicated by Donald Spencer Wide-Band Information Transmission at the Calyx of Held, University of Leicester, Leicester LE1 9HN, U.K. Bruce P. Graham b.graham@cs.stir.ac.uk Computing Science and Mathematics, University of Stirling, Stirling FK9 4LA, U.K. We use a mathematical model of the calyx of Held

Graham, Bruce

482

*HEAB4ALEAM Modern Physics Letters B, Vol. 18, No. 10 (2004) 385391  

E-Print Network [OSTI]

*HEAB4ALEAM Modern Physics Letters B, Vol. 18, No. 10 (2004) 385­391 c World Scientific Publishing-insulator transition, whereas calculations on the closed system allow elucidation of various levels statistics. We also cosh . (1) The node parameter is related to the electron energy in the following way = - 2 ln

Horovitz, Baruch

483

LETTER The evolution of salinity tolerance in Daphnia: a functional genomics approach  

E-Print Network [OSTI]

phenotypic assays with functional genomics to understand how tolerance to a salinity gradient evolves, and weLETTER The evolution of salinity tolerance in Daphnia: a functional genomics approach Leigh C of fitness or a cost of transcription relative to a salt-intolerant genotype in low saline environments. We

Weider, Lawrence J.

484

Political Science OFFICE: Nasatir Hall 127 In the College of Arts and Letters  

E-Print Network [OSTI]

341 Political Science OFFICE: Nasatir Hall 127 In the College of Arts and Letters TELEPHONE: (619, Ingram, Stoddard, Sullivan Offered by the Department Master of Arts degree in political science. Major in political science with the B.A. degree in liberal arts and sciences. Emphasis in legal studies. Minor

Gallo, Linda C.

485

Political Science In the College of Arts and Letters OFFICE: Nasatir Hall 127  

E-Print Network [OSTI]

346 Political Science In the College of Arts and Letters OFFICE: Nasatir Hall 127 TELEPHONE: (619 in political science. Major in political science with the B.A. degree in liberal arts and sciences. Minor in political science. The Major Political science is the study of governments. Its concerns, how- ever

Gallo, Linda C.

486

Political Science In the College of Arts and Letters OFFICE: Nasatir Hall 127  

E-Print Network [OSTI]

348 Political Science In the College of Arts and Letters OFFICE: Nasatir Hall 127 TELEPHONE: (619, Ingram, Sullivan Offered by the Department Master of Arts degree in political science. Major in political science with the B.A. degree in liberal arts and sciences. Emphasis in legal studies. Minor in political

Gallo, Linda C.

487

IEEE COMMUNICATIONS LETTERS, ACCEPTED FOR PUBLICATION 1 Reliability Analysis of Wireless Sensor Networks with  

E-Print Network [OSTI]

IEEE COMMUNICATIONS LETTERS, ACCEPTED FOR PUBLICATION 1 Reliability Analysis of Wireless Sensor that energy conservation is crucial in sensor node (SN) design to prolong the WSN lifetime. A WSN and correctness proof. Performance issues, especially in energy conservation to best tradeoff security failure

Chen, Ing-Ray

488

Resource Letter FNP-1: Frontiers of nuclear physics G. F. Bertscha)  

E-Print Network [OSTI]

Resource Letter FNP-1: Frontiers of nuclear physics G. F. Bertscha) Department of Physics activities in nuclear physics and also a guide for finding useful nuclear data. The major areas included, and nuclear instrumentation. © 2004 American Association of Physics Teachers. DOI: 10.1119/1.1763174 I

Bertsch George F.

489

VOLUME 6S, NUMBER 13 PHYSICAL REVIEW LETTERS Very Cold Trapped Atoms in a Vapor Cell  

E-Print Network [OSTI]

VOLUME 6S, NUMBER 13 PHYSICAL REVIEW LETTERS Very Cold Trapped Atoms in a Vapor Cell 24 SEPTEMBER sample of spin-polarized trapped atoms. The technique used dramati- cally simplifies the production of laser-cooled atoms. In this experiment, 1.8x10' neutral cesium atoms were optically captured directly

Monroe, Christopher

490

Audit Letter Report: INS-L-07-0 1 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

INS-L-07-0 1 Audit Letter Report: INS-L-07-0 1 October 18, 2006 Drug Testing For Security Positions at DOE's Portsmouth and PaducahSites" (S051S036) In 1993, both plants were...

491

Regulatory Guidance Letter 88-15 SUBJECT: Third-Party Contracting  

E-Print Network [OSTI]

Regulatory Guidance Letter 88-15 SUBJECT: Third-Party Contracting DATE: November 7, 1988 EXPIRES is to clarify the Corps role when the permit applicant or permittee chooses to use third-party contracting to obtain the information. This policy applies to all information requests involving third-party contracting

US Army Corps of Engineers

492

Green functors Recall that the letter R denotes a commutative and associative ring with  

E-Print Network [OSTI]

Green functors Recall that the letter R denotes a commutative There are (at least) two equivalent definitions of Green functors for G over R. 1.1. Using the poset of subgroups of G. This definition of Green func- tors uses the poset of subgroups of G. It goes back to Green

Bouc, Serge

493

Audit Letter Report: OAS-L-10-02 | Department of Energy  

Office of Environmental Management (EM)

OAS-L-10-02 Audit Letter Report: OAS-L-10-02 October 21, 2009 Follow-up Audit of Test Readiness at the Nevada Test Site As part of a self-imposed moratorium on testing, the...

494

IEEE SIGNAL PROCESSING LETTERS, VOL. 18, NO. 10, OCTOBER 2011 587 Compressed LED Illumination Sensing  

E-Print Network [OSTI]

IEEE SIGNAL PROCESSING LETTERS, VOL. 18, NO. 10, OCTOBER 2011 587 Compressed LED Illumination emitting diodes (LEDs) are ca- pable of producing high intensity light across a wide spread of frequencies. This facilitates the design of the driving waveforms for the LEDs. This procedure is known as illumination sensing

Nehorai, Arye

495

IEEE PHOTONICS TECHNOLOGY LETTERS 1 Remote Optoelectronic Frequency Down-Conversion  

E-Print Network [OSTI]

IEEE PHOTONICS TECHNOLOGY LETTERS 1 Remote Optoelectronic Frequency Down-Conversion Using 60-GHz Kim, Associate Member, IEEE Abstract--A new optoelectronic frequency down-conversion method for radio local oscillator signals. Using this optoelectronic frequency down-converter, an RoF uplink

Choi, Woo-Young

496

SO8 IEEE PHOTONICS TECHNOLOGY LETTERS. VOL. 7 , NO. S. MAY 1995 Monolithic Optoelectronic Circuit Design  

E-Print Network [OSTI]

SO8 IEEE PHOTONICS TECHNOLOGY LETTERS. VOL. 7 , NO. S. MAY 1995 Monolithic Optoelectronic Circuit optoelectronic integration technique was proposed based on this circuit stability and consequently the monolithic integration of LED's and GaAs circuits by molecular beam epitaxial (MBE) growth, to form an optoelectronic

Shenoy, Krishna V.

497

Physics Letters A 356 (2006) 6571 www.elsevier.com/locate/pla  

E-Print Network [OSTI]

of electron physical processes is much reduced from the classical prediction, possibly enabling new regimesPhysics Letters A 356 (2006) 65­71 www.elsevier.com/locate/pla Controlled fusion with hot-ion mode in a degenerate plasma S. Son , N.J. Fisch Department of Astrophysical Sciences, Princeton University, Princeton

498

Physics Letters A 356 (2006) 7278 www.elsevier.com/locate/pla  

E-Print Network [OSTI]

Physics Letters A 356 (2006) 72­78 www.elsevier.com/locate/pla Ignition regime for fusion regimes in which aneutronic fuels can undergo fusion ignition in hot-ion degenerate plasma. Because regime, the reduc- tion in e­i collisions relative to classical plasma increases the current drive

499

1526 OPTICS LETTERS / Vol. 21, No. 19 / October 1, 1996 Phase-shifting point diffraction interferometer  

E-Print Network [OSTI]

1526 OPTICS LETTERS / Vol. 21, No. 19 / October 1, 1996 Phase-shifting point diffraction interferometer H. Medecki Center for X-Ray Optics, Lawrence Berkeley National Laboratory, Berkeley, California, Berkeley, Berkeley, California 94720 K. A. Goldberg Center for X-Ray Optics, Lawrence Berkeley National

Bokor, Jeffrey

500

2094 OPTICS LETTERS / Vol. 28, No. 21 / November 1, 2003 Fundamental and vortex solitons in a  

E-Print Network [OSTI]

2094 OPTICS LETTERS / Vol. 28, No. 21 / November 1, 2003 Fundamental and vortex solitons in a two-dimensional optical lattice Jianke Yang Department of Mathematics and Statistics, University of Vermont, Burlington-dimensional optically induced waveguide array are reported. In the strong localization regime the fundamental soliton

Yang, Jianke