Powered by Deep Web Technologies
Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Energy Department Awards Small Business Contract for Legacy Management Work  

Broader source: Energy.gov (indexed) [DOE]

Small Business Contract for Legacy Small Business Contract for Legacy Management Work to S.M. Stoller Corporation Energy Department Awards Small Business Contract for Legacy Management Work to S.M. Stoller Corporation July 2, 2007 - 2:54pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the award of a prime contract for the Department's Office of Legacy Management (LM) Support Services work to S.M. Stoller Corporation for surveillance and maintenance and technical support at more than 100 of DOE's legacy sites. The three-year contract, with one two-year extension option for a total of five years, is valued at approximately $170 million over the life of the contract and is one of the largest 100% small business contracts within DOE. The contract includes responsibility for legacy sites that have been

2

Energy Department Awards Small Business Contract for Legacy Management...  

Energy Savers [EERE]

the award of a prime contract for the Department's Office of Legacy Management (LM) Support Services work to S.M. Stoller Corporation for surveillance and maintenance and...

3

A METHOD FOR REWRITING LEGACY SYSTEMS USING BUSINESS PROCESS MANAGEMENT TECHNOLOGY  

E-Print Network [OSTI]

Process Management (BPM). The use of BPM for migrating legacy systems facilitates the monitoring, in this paper we present a method for rewriting legacy systems based on Busi- ness Process Management (BPM). During the last years we have seen an increasing adoption of BPM tools by enterprises as well as emerging

Ulm, Universität

4

COMPREHENSIVE LEGACY MANAGEMENT  

Office of Legacy Management (LM)

Comprehensive Legacy Management and Institutional Controls Plan U.S. Department of Energy Volume I-Legacy Management Plan Doc. No. S03496-8.0-Final Page 6 January 2015...

5

Legacy Management Contacts | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Legacy Management Contacts Legacy Management Contacts Legacy Management Contacts Title Name Phone Fax LM Director David Geiser (202) 586-7550 (202) 586-8403 Office of Business Operations Director Barbara McNeal Lloyd (202) 586-7550 (202) 586-8403 Benefits Continuity Team Patrick Ring Team Leader (202) 586-1835 (202) 586-1540 Planning, Budget, and Acquisition Team Jane Powell, Team Leader (202) 586-3924 (202) 586-1540 Archives and Information Management Team John Montgomery Team Leader (304) 413-0816 (304) 413-0540 Human Resource Management Patricia Poole-Shirriel Team Leader (202) 586-0402 (202) 586-1540 Administrative Team Teresa Collins Team Leader (202) 586-8259 (202) 586-1540 Office of Site Operations Director Tom Pauling (202) 586-1782 (202) 586-1540 Environmental Team 1

6

LEGACY MANAGEMENT REQUIRES INFORMATION  

SciTech Connect (OSTI)

''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

CONNELL, C.W.; HILDEBRAND, R.D.

2006-12-14T23:59:59.000Z

7

Office of Legacy Management  

Office of Legacy Management (LM)

Energy Energy Office of Legacy Management JUL 1 0 2008 Alonso Ramirez, Scientific Director EI Verde Research Station Institute for Tropical Ecosystem Studies University of Puerto Rico P.o. Box 21910 San Juan, PR 00931 .Subject: Regulatory Status of Study Area 4 Dear Dr. Ramirez: I want to thank you and your staff, especially John Bithom for taking time to escort us to Study Area 4 several weeks ago. While planning the visit to the EI Verde Research Station, we mentioned that the radioactive materials license for the tree in Study Area 4 was terminated. Termination was based on radiological conditions meeting criteria for protectiveness. At that time, we sent by email the application to amend the University of Puerto Rico radioactive materials license, which we

8

2012 Annual Planning Summary for Legacy Management  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Legacy Management.

9

Legacy Management Specific Training | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Legacy Management Specific Training Legacy Management Specific Training Legacy Management Specific Training Registration Information The following courses are specific to Legacy Management Employees, for more information about the courses below or to register for any of these courses please contact Chequita Johnson. Mandatory Training ECOMM, Environmental-Related External Communication (E-COMM) Tracking System GPP101, Management of Government Personal Property RM 102, Basic Records Management Training (DOE) Training at All LM Site Offices EC 100, Environmental Management System General Awareness (DOE) ER 200, Site Emergency Preparedness [All sites except Grand Junction] SC 105, Security Awareness Briefing Washington, DC HQ Mini Coop Briefing Fernald, OH FE110, Fernald Preserve Site Awareness Briefing

10

Office of Legacy Management  

Broader source: Energy.gov (indexed) [DOE]

December 1.7, 2010 December 1.7, 2010 MEMORANDUM FOR DAVID W. GEISER, DIRECTOR, DOE-LM- 1 FROM: TRACY A. RIBEIRO, ENVIRONMENTAL PROGRAM MANAGER, DOE-LM , f , ,,, Tracy R i b e ~ r o n / / 2010.1 2 17 08:47:34 -07'00' SUBJECT: Approval of FY 201 1 EMS Goals and Initiatives In accordance with the requirements of the DOE-LM Environmental Management System Description, the highlighted EMS goals and initiatives for FY 201 1 are enclosed for your formal approval. The EMS goals and initiatives align with DOE Order 450.1 A, Environmental Protection Program; DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management; the Transformational Energy Action Management (TEAM) Initiative, Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management,

11

Categorical Exclusion Determinations: Legacy Management | Department of  

Broader source: Energy.gov (indexed) [DOE]

Legacy Management Legacy Management Categorical Exclusion Determinations: Legacy Management Categorical Exclusion Determinations issued by Legacy Mangement. DOCUMENTS AVAILABLE FOR DOWNLOAD May 28, 2013 CX-010396: Categorical Exclusion Determination Bioremediation Injection and Related Activities at the Pinellas Site, Largo, Florida CX(s) Applied: B3.1, B6.1 Date: 05/28/2013 Location(s): Florida Offices(s): Legacy Management May 28, 2013 CX-010533: Categorical Exclusion Determination Road Maintenance on roads Used to Access Groundwater Monitoring Wells South of the Tuba City, Arizona, Uranium Mill Tailing Remedial Action Title I Site CX(s) Applied: B1.3, B3.3, B6.1 Date: 05/28/2013 Location(s): Arizona Offices(s): Legacy Management November 2, 2012 CX-009399: Categorical Exclusion Determination

12

Office of Legacy Management | Department of Energy  

Office of Legacy Management (LM)

Office of Legacy Management Timbered ore bin and adits (mine openings) at a Defense-Related Uranium Mine located in southwestern Montrose County, Colorado Timbered ore bin and...

13

College of Legacy Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Legacy Management Legacy Management College of Legacy Management College of Legacy Management Vision The College of Legacy Management (CLM) provides DOE program offices with access to the types of training that enables LM to execute its mission of protecting human health and the environment. CLM strives to: Encourage a high-quality workforce Ensure employees get the right skills, at the right time Empower employees to take charge of their own careers through accessible training Retain a best-in-class workforce by providing learning opportunities Maintain and share mission-critical knowledge Increase performance through the development of strong leaders Remain one of the best places to work in the Federal Government by investing in education CLM is a gateway to professional development opportunities including

14

Legacy Management FUSRAP Sites | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Legacy Management FUSRAP Sites Legacy Management FUSRAP Sites Legacy Management FUSRAP Sites Legacy Management FUSRAP Sites Long-Term Surveillance and Maintenance (LTS&M) of Remediated FUSRAP Sites The DOE Office of Legacy Management (LM) established LTS&M requirements for remediated FUSRAP sites. DOE evaluates the final site conditions of a remediated site on the basis of risk for different future uses. DOE then confirms that LTS&M requirements will maintain protectiveness. Most Formerly Utilized Sites Remedial Action Program (FUSRAP) sites are remediated to conditions that pose no risk to human health and the environment under any future use scenario. With regulator concurrence, these sites are released for unrestricted use. No ongoing surveillance is required and LM responsibilities consist of preserving site records and

15

LM-04-XXXX Office of Legacy Management  

Broader source: Energy.gov (indexed) [DOE]

LM-04-XXXX LM-04-XXXX Office of Legacy Management Information and Records Management Transition Guidance March 2004 LM Information and Records Management Transition Guidance March 2004 Contents Page ii Table of Contents Page Executive Summary................................................................................................................... iii 1.0 Introduction and Purpose ................................................................................................... 1 2.0 The Life Cycle of Records ................................................................................................... 3 3.0 Organizational Responsibilities.......................................................................................... 4 3.1 Joint Responsibilities.....................................................................................................

16

DOE - Office of Legacy Management -- Hallam  

Office of Legacy Management (LM)

Nebraska Nebraska Hallam, Nebraska, Decommissioned Reactor Site A D&D Program Site hallam_map As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Hallam Decommissioned Reactor Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Hallam site, view the fact sheet. Site Documents and Links Contact Us Inspection/Sampling Schedule Hallam Decommissioned Reactor Site Mapping and Monitoring (GEMS)

17

Office of Legacy Management (LM) Program Update, July¬タモSeptember 2009  

Broader source: Energy.gov (indexed) [DOE]

- - S e p t e m b e r 2 0 0 9 Visit us at www.LM.doe.gov Welcome to the 2009 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update July-September LM@hq.doe.gov Program Update ENERGY Legacy Management U.S. DEPARTMENT OF See page 1 for a map of LM sites. 2 See page 13 for a more detailed version of LM's goals. Legacy Management Goals The Legacy Management Business Center (LMBC) has been completed and is slated to open December 22, 2009. The facility supports the LM base missions by providing the primary location for records management and records storage, information technology (IT) infrastructure, and business support functions. The facility comprises a large records storage warehouse, an area to store specially designated records,

18

DOE - Office of Legacy Management -- Fernald  

Office of Legacy Management (LM)

Ohio Ohio Fernald Preserve, Ohio Key Documents and Links Fernald Preserve, Harrison, Ohio, Fact Sheet pdf_icon Draft 2014 Comprehensive Legacy Management and Institutional Controls Plan pdf_icon Comprehensive Legacy Management and Institutional Controls Plan (LMICP): Volume I-Legacy Management Plan pdf_icon Volume II-Institutional Controls Plan pdf_icon Attachment A pdf_icon Attachment B pdf_icon Attachment C pdf_icon Attachment D pdf_icon Attachment E pdf_icon 2012 Site Environmental Report pdf_icon Visitors Center Site Reports Wetland Mitigation Monitoring Report Environmental Monitoring Data - Downloadable Files Fernald Closure Project Website Disclaimer Fernald Citizens Advisory Board Website Disclaimer Fernald Natural Resource Trustee Disclaimer Please be green - do not print these documents unless absolutely necessary

19

Categorical Exclusion Determinations: Legacy Management | Department of  

Broader source: Energy.gov (indexed) [DOE]

December 22, 2011 December 22, 2011 CX-007752: Categorical Exclusion Determination Routine Activities at the Hallam, Nebraska, Decommissioned Reactor Site CX(s) Applied: B1.3, B1.24, B3.1 Date: 12/22/2011 Location(s): Nebraska Offices(s): Legacy Management December 14, 2011 CX-007441: Categorical Exclusion Determination Routine Actions at the Central Nevada Test Area CX(s) Applied: B1.3, B3.1 Date: 12/14/2011 Location(s): Nevada Offices(s): Legacy Management December 13, 2011 CX-007440: Categorical Exclusion Determination Routine Maintenance Activities at the Grand Junction Regional Airport, Colorado, Calibration Model Facility CX(s) Applied: B1.3, B1.24 Date: 12/13/2011 Location(s): Colorado Offices(s): Legacy Management December 13, 2011 CX-007439: Categorical Exclusion Determination

20

Categorical Exclusion Determinations: Legacy Management | Department of  

Broader source: Energy.gov (indexed) [DOE]

March 16, 2010 March 16, 2010 CX-001392: Categorical Exclusion Determination Fill in Former Meander Channel near the Naturita, Colorado Processing Site CX(s) Applied: B1.20 Date: 03/16/2010 Location(s): Naturita, Colorado Office(s): Legacy Management March 4, 2010 CX-001115: Categorical Exclusion Determination Hand Auger Samples in East Fork Arroyo, Shiprock, New Mexico Disposal Site CX(s) Applied: B3.1 Date: 03/04/2010 Location(s): Shiprock, New Mexico Office(s): Legacy Management March 2, 2010 CX-001116: Categorical Exclusion Determination Transfer Salmon Property to the Forestry Commission, State of Mississippi CX(s) Applied: B1.25 Date: 03/02/2010 Location(s): Salmon, Mississippi Office(s): Legacy Management February 20, 2010 CX-001000: Categorical Exclusion Determination Maintenance Projects

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Office of Legacy Management | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Office of Legacy Management Office of Legacy Management Bluewater, New Mexico, Disposal Site Read more Central Nevada Test Area, Nevada Read more Rocky Flats, Colorado, Site Read more Abandoned Uranium Mines Report to Congress Read more Tuba City, Arizona, Disposal Site Read more Announcements DOE has launched a website for the Asset Revitalization Initiative (ARI), a DOE-wide effort to advance the beneficial reuse of its unique and diverse mix of assets, including land, facilities, infrastructure, equipment, technologies, natural resources and a highly skilled workforce. The U.S. Department of Energy Office of Legacy Management has prepared the October-December 2013 Program Update newsletter. Registration is now open for the 2014 National Environmental Justice Conference &Training Program. For more information see our English or

22

Office of Legacy Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Office of Legacy Management Office of Legacy Management Bluewater, New Mexico, Disposal Site Read more Central Nevada Test Area, Nevada Read more Rocky Flats, Colorado, Site Read more Abandoned Uranium Mines Report to Congress Read more Tuba City, Arizona, Disposal Site Read more Announcements DOE has launched a website for the Asset Revitalization Initiative (ARI), a DOE-wide effort to advance the beneficial reuse of its unique and diverse mix of assets, including land, facilities, infrastructure, equipment, technologies, natural resources and a highly skilled workforce. The U.S. Department of Energy Office of Legacy Management has prepared the July-September 2013 Program Update newsletter. Registration is now open for the 2014 National Environmental Justice Conference &Training Program. For more information see our English or

23

2014 Annual Planning Summary for the Office of Legacy Management  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Legacy Management..

24

2013 Annual Planning Summary for the Office of Legacy Management  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Office of Legacy Management .

25

Office of Legacy Management Significant Environmental Aspects  

Broader source: Energy.gov (indexed) [DOE]

9/2013 9/2013 Office of Legacy Management Significant Environmental Aspects The mission of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is to safely manage DOE's postclosure responsibilities and ensure the future protection of human health and the environment. We have evaluated all of our activities for their potential impact on the environment, and we have identified those aspects that could have a significant impact if they were not controlled. This information is used to develop programs to prevent or mitigate potential impacts and to establish prioritized goals, objectives, and targets for continually improving performance. Our significant environmental aspects fall into four categories: * Waste generation and minimization

26

DOE - Office of Legacy Management -- Piqua  

Office of Legacy Management (LM)

Ohio Ohio Piqua, Ohio, Decommissioned Reactor Site A D&D Program Site piqua_map As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Piqua Decommissioned Reactor Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Piqua site, view the fact sheet. Site Documents and Links Contact Us Inspection/Sampling Schedule Piqua Decommissioned Reactor Site Mapping and Monitoring (GEMS) Last Updated: 6/13/2011

27

DOE - Office of Legacy Management -- Bonus  

Office of Legacy Management (LM)

Puerto Rico Puerto Rico Boiling Nuclear Superheater (BONUS), Puerto Rico, Decommissioned Reactor Site La Antiqua Central Nuclear de Aqua Hirviente Sobrecalentada Reactor Fuera de Servico Activo A D&D Program Site bonus_map3 As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Boiling Nuclear Superheater (BONUS) Decommissioned Reactor Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2004 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the BONUS site, view the fact sheet.

28

Business System Management Review  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

P-004 Business System Management Review Process 11_0304Page 1 of 7 P-004 Business System Management Review Process 11_0304Page 1 of 7 EOTA - Business Process Document Title: Business System Management Review Process Document Number: P-004 Rev 11_0304 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: Q-001, Quality Manual Notify of Changes: EOTA Employees Referenced Document(s): F-009, Business System Management Review Template P-004 Business System Management Review Process 11_0304Page 2 of 7 Revision History: Rev. Description of Change A Initial Release 08_0414 Corrective Actions, Preventive Actions, and Improvement Opportunity 09_1124 Edited document for clarity and to better fit the process in use. Added requirement to provide management with

29

Categorical Exclusion Determinations: Legacy Management | Department of  

Broader source: Energy.gov (indexed) [DOE]

May 5, 2011 May 5, 2011 CX-005883: Categorical Exclusion Determination Routine Monitoring, Maintenance, and Administrative Actions at the Salmon, Mississippi Site CX(s) Applied: A8, A9, A11, B3.1 Date: 05/05/2011 Location(s): Salmon, Mississippi Office(s): Legacy Management May 4, 2011 CX-005849: Categorical Exclusion Determination Routine Monitoring, Maintenance, and Administrative Actions at the Gunnison Disposal and Former Processing, Colorado, Sites CX(s) Applied: B1.3, B3.1 Date: 05/04/2011 Location(s): Gunnison, Colorado Office(s): Legacy Management April 14, 2011 CX-005682: Categorical Exclusion Determination Routine Monitoring, Maintenance, Research, General Site, and Administrative Actions at the Shiprock, New Mexico, Disposal Site CX(s) Applied: A1, A8, B1.3, B1.11, B1.20, B3.1

30

Legacy Risk Measure for Environmental Management Waste  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) is investigating the development of a comprehensive and quantitative risk model framework for environmental management activities at the site. Included are waste management programs (high-level waste, transuranic waste, low-level waste, mixed low-level waste, spent nuclear fuel, and special nuclear materials), major environmental restoration efforts, major decontamination and decommissioning projects, and planned long-term stewardship activities. Two basic types of risk estimates are included: risks from environmental management activities, and long-term legacy risks from wastes/materials. Both types of risks are estimated using the Environment, Safety, and Health Risk Assessment Program (ESHRAP) developed at the INEEL. Given these two types of risk calculations, the following evaluations can be performed: Risk evaluation of an entire program (covering waste/material as it now exists through disposal or other end states) Risk comparisons of alternative programs or activities Comparisons of risk benefit versus risk cost for activities or entire programs Ranking of programs or activities by risk Ranking of wastes/materials by risk Evaluation of site risk changes with time as activities progress Integrated performance measurement using indicators such as injury/death and exposure rates. This paper discusses the definition and calculation of legacy risk measures and associated issues. The legacy risk measure is needed to support three of the seven types of evaluations listed above: comparisons of risk benefit versus risk cost, ranking of wastes/materials by risk, and evaluation of site risk changes with time.

Eide, Steven Arvid; Nitschke, Robert Leon

2002-02-01T23:59:59.000Z

31

DOE - Office of Legacy Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Services Calibration Facilities Ecosystem Management Team Environmental Justice Environmental Management System Long-Term Surveillance and Maintenance Operations and Maintenance Post-Closure Benefits Property Records Management Stakeholder Relations Sites Considered Sites LM Sites Sites Pending Transfer to LM Programmatic Framework Mission News About Us LM Sites Select a Site Acid/Pueblo Canyon Adrian Site Albany Site Aliquippa Site Ambrosia Lake Site Amchitka Site Ashtabula Site Bayo Canyon Site Berkeley Site Beverly Site Bluewater Site BONUS Site Buffalo Site Burrell Site Canonsburg Site CEER Sites Chariot Site Chicago North Site Chicago South Site Chupadera Mesa Site CNTA Site Colonie Site Columbus Sites Columbus

32

Colorado Environmental Coalition v. Office of Legacy Management, Civil  

Broader source: Energy.gov (indexed) [DOE]

Colorado Environmental Coalition v. Office of Legacy Management, Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011) U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). The Court has issued the injunctive relief described on pages 51-52 of the Order. U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). More Documents & Publications Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012)

33

Colorado Environmental Coalition v. Office of Legacy Management, Civil  

Broader source: Energy.gov (indexed) [DOE]

Colorado Environmental Coalition v. Office of Legacy Management, Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012) U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). More Documents & Publications Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011) LG Electronics v. DOE - Defendants' Brief in Opposition to Plaintiff LG

34

DOE - Office of Legacy Management -- Pinellas Plant General Electric...  

Office of Legacy Management (LM)

Protection FACT SHEET Location of the Pinellas County, Florida, Site Office of Legacy Management Pinellas County, Florida, Site This fact sheet provides information about...

35

DOE - Office of Legacy Management -- Shiprock Mill Site - NM...  

Office of Legacy Management (LM)

Evaluation of the Trench 2 Groundwater Remediation System at the Shiprock, New Mexico, Legacy Management Site March 2009 Supplement to the Baseline Risk Assessment of Ground Water...

36

DOE - Office of Legacy Management -- Hallam Nuclear Power Facility...  

Office of Legacy Management (LM)

was successfully conducted on April 29, 2009. The inspectio FACT SHEET Office of Legacy Management Location of the Hallam Decommissioned Reactor Hallam, Nebraska,...

37

DOE - Office of Legacy Management -- Canonsburg Industrial Park...  

Office of Legacy Management (LM)

Package-October 2008 Groundwater and Surface Water Sampling FACT SHEET Office of Legacy Management Canonsburg, Pennsylvania, Disposal Site Project Plan: Ground Water...

38

DOE - Office of Legacy Management -- Ambrosia Lake Mill Site...  

Office of Legacy Management (LM)

Surveillance Plan (LTSP) for the Ambrosia Lake, New Mexico Site. FACT SHEET Office of Legacy Management Ambrosia Lake, New Mexico, Disposal Site This fact sheet provides...

39

DOE - Office of Legacy Management -- BurrisPark_FUSRAP  

Office of Legacy Management (LM)

by UC-Berkeley require no further remediation. Final Conditions- The DOE Office of Legacy Management assumed maintenance-only responsibility for the remaining contamination in...

40

DOE - Office of Legacy Management -- Maybell Mill Site - CO 0...  

Office of Legacy Management (LM)

Colorado (UMTRCA Title I) Disposal Site Moffat County, Colorado April 2008 Office of Legacy Management Historical documents may contain links which are no longer valid or to...

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites  

Broader source: Energy.gov [DOE]

Managing Legacy Records for Formerly Utilized Sites Remedial Action Program Sites (Waste Management Conference 2008)

42

DOE - Office of Legacy Management -- Rocky  

Office of Legacy Management (LM)

Rocky Flats Site, Colorado Rocky Flats Site, Colorado A CERCLA and/or RCRA Site rkyflats_2011 Remediation at the Rocky Flats Site was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. The site transferred to the Office of Legacy Management in 2008 and requires operation and maintenance of remedial action systems, routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Rocky Flats site, view the fact sheet. Site History Site Documents Community Involvement Contact Us Rocky Flats Benefits Administration Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Record Database

43

DOE - Office of Legacy Management -- Monticello  

Office of Legacy Management (LM)

Utah Utah Monticello, Utah, Disposal and Processing Sites A CERCLA and/or RCRA Site monticello_map Remediation at the Monticello Sites was conducted in accordance with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or Resource Conservation and Recovery Act (RCRA) regulations. The sites transferred to the Office of Legacy Management in 2003 and require operation and maintenance of remedial action systems, routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Monticello sites, view the fact sheet. Site Documents and Links Contact Us Inspection/Sampling Schedule Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Record Database

44

DOE - Office of Legacy Management -- Columbus  

Office of Legacy Management (LM)

Columbus, Ohio, Sites Columbus, Ohio, Sites Other Regulatory Framework columbusClosure2013 The Columbus, Ohio, Sites consist of two separate properties owned by the Battelle Memorial Institute: the King Avenue site, located in the city of Columbus, and the West Jefferson site, located approximately 15 miles west of Columbus. Battelle conducted extensive nuclear research at both locations for the U.S. Department of Energy (DOE) and its predecessor agencies between 1943 and 1986. The facilities have been decontaminated and released for unrestricted use. Responsibility for maintaining records for the Columbus sites transferred to DOE's Office of Legacy Management in 2008. The sites require records management and stakeholder support. For more information about the Columbus sites, view the fact sheet.

45

DOE - Office of Legacy Management -- Ashtabula  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ohio Ohio Ashtabula, Ohio, Site Other Regulatory Framework ashtabula2013 The Ashtabula, Ohio, Site is a 42.5-acre, privately owned site adjacent to the city of Ashtabula, about 55 miles east of Cleveland. From 1962 to 1988 Reactive Metals, Inc. (RMI) operated a facility on the property that manufactured metallic uranium tubes and rods and experimental quantities of thorium metal for use in the Hanford, Washington; and Savannah River, Georgia, weapons program reactors. RMI also extruded depleted uranium and nonradioactive materials, primarily copper-based, for the private sector. The site has been decontaminated and released for unrestricted use. Responsibility for maintaining records for the Ashtabula site was transferred to DOE's Office of Legacy Management in 2010. The site requires records management and stakeholder support. For more information about the Ashtabula site, view the fact sheet.

46

DOE - Office of Legacy Management -- Mexican Hat Mill Site -...  

Office of Legacy Management (LM)

at Mexican Hat, Utah. This site is managed by the U.S. Department of Energy Office of Legacy Management. Final Site Observational Work Plan for the UMTRA Project Site at Mexican...

47

Roadmap: Business Management Technology Business Administration Associate of Applied Business  

E-Print Network [OSTI]

Roadmap: Business Management Technology ­ Business Administration ­ Associate of Applied Business This roadmap is a recommended semester-by-semester plan of study for this major. However, courses Credit Hours] ACTT 11001 Accounting II-Managerial 4 BMRT 11009 Introduction to Management Technology 3

Sheridan, Scott

48

DOE - Office of Legacy Management -- MURR  

Office of Legacy Management (LM)

Missouri Missouri Missouri University Research Reactor (MURR), Missouri, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Other Documents Fact Sheet Missouri University Research Reactor Site Fact Sheet December 15, 2011 Other Documents Removal of TRU Waste from the Missouri University Research Reactor Final Closeout Report September 16, 2004 Approval of the Critical Decision 4 for the Mixed Transuranic (TRU) Waste Removal Project, University of Missouri Research Reactor (MURR), Columbia, Missouri, and Transfer of Records to Office of Legacy Management (LM) August 24, 2004

49

DOE - Office of Legacy Management -- Visitors Center  

Office of Legacy Management (LM)

Ohio > Fernald > Visitors Center > Visitors Center Ohio > Fernald > Visitors Center > Visitors Center Fernald Preserve, Ohio Fernald Preserve Visitors Center Fernald Visitors Center Fernald Preserve Home Page Visitors Center Directions Event Calendar Community Meeting Room Guided Tour Educational Field Trip Speaker Request Brochures Fact Sheets Presentations BioBlitz Geocaching Pets Policy The Fernald Preserve Visitors Center is a 10,000-square-foot green building that celebrates the rich and varied history of the Fernald site. Information on the site's natural, Native American, settlement and farming, uranium production, and environmental cleanup eras, as well as the recent ecological restoration and legacy management mission, is presented through a series of exhibits. Admission to the Visitors Center is free, and

50

Sustainable Disposal Cell Covers: Legacy Management Practices, Improvements, and Long-Term Performance  

Broader source: Energy.gov [DOE]

Sustainable Disposal Cell Covers: Legacy Management Practices, Improvements, and Long-Term Performance

51

DOE - Office of Legacy Management -- El_Verde  

Office of Legacy Management (LM)

Rico El Verde, Puerto Rico, Site Other Regulatory Framework elverde The DOE Office of Legacy Management assumed responsibility for a tree in Study Area 4 of El Verde site in 2005....

52

DOE - Office of Legacy Management -- ITL  

Office of Legacy Management (LM)

New Mexico New Mexico Inhalation Toxicology Laboratory (ITL), New Mexico, Site Other Regulatory Framework ITL_map ITL is a research facility originally created by the Atomic Energy Commission, a predecessor agency of U.S. Department of Energy (DOE), to study respiratory health issues. In 1996, as a result of decreasing DOE funding for the type of work conducted at the laboratory, DOE awarded a Cooperative Agreement to the Lovelace Respiratory Research Institute (Lovelace) to assist them with converting the facility into a private-sector operation. Lovelace conducted remedial action in the early 1990s and completed cleanup at several sites in 1997. Property transfer legislation passed on March 30, 2009, will result in the transfer of ITL property title from DOE to Lovelace. The legislation, once property transfer occurs, will also release DOE from all environmental liability at the ITL site, including contamination from past, present, or future activities. The DOE Office of Legacy Management is responsible for historic government-owned records management and long-term groundwater monitoring at the facility. For more information about the ITL site, view the fact sheet.

53

Legacy Management CERCLA Sites Quality Assurance Project Plan  

SciTech Connect (OSTI)

S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, Quality Assurance Requirements, ANSI/ASQC E4-2004, Quality Systems for Environmental Data and Technology Programs Requirements with Guidance for Use, and ISO 14001-2004, Environmental Management Systems, have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, Quality Assurance Program, identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, QA Program Implementation, identifies the TAC organizations that have responsibility for implementing the QA program requirements; and Appendix C of the QA Manual provides comparison tables that identify where the requirements of other standards are addressed in the QA Manual.

none,

2007-05-03T23:59:59.000Z

54

Office of Legacy Management Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Office of Legacy Management Office of Legacy Management Categorical Exclusion Determination Form Prog ram or Field Office: Office of Legacy Management Proj ect Tit le and 1.0. No.: Routine Maintenance Activities at the Grand Junction Regional Airport, Colorado, Calibration Model Facility. LM # 44 -11. Location: Grand Junction, Colorado Proposed Action or Proj ect Description: DO E proposes to conduct routine maintenance actions as needed at a facility containing five concrete calibration pads. The facility is located at the Grand Junction Regional Airport on property leased from the Airport Authority. Renewal of the lease generally takes place every 5 years with the next renewal anticipated in 2013. Routine maintenance actions might include site inspections and vehicle vacuum sweeping of the pads. The small amount

55

Office of Legacy Management Real Property Reuse Strategy, August 2009 |  

Broader source: Energy.gov (indexed) [DOE]

Real Property Reuse Strategy, August Real Property Reuse Strategy, August 2009 Office of Legacy Management Real Property Reuse Strategy, August 2009 LM is committed to the environmentally sound disposition, and the beneficial reuse, of property. LM is currently conducting real property reuse activities at LM sites throughout the country. This strategy document addresses LM's property disposition and real property reuse priorities for the next several years. Office of Legacy Management Real Property Reuse Strategy, August 2009 More Documents & Publications Quarterly EMS Performance FY 2013 Second Quarter Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

56

Business System Management Review Template  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

F-009 Business System Management Review Template 09_0519 Page 1 of 12 F-009 Business System Management Review Template 09_0519 Page 1 of 12 Company - Business Form Document Title: Business System Management Review Template Document Number: F-009 Rev. 11_0628 Document Owner: Elizabeth Sousa Backup Owner: Melissa Otero Approver(s): Melissa Otero Parent Document: P-004, Business System Management Review Notify of Changes: QAM, MGT Referenced Document(s): N/A F-009 Business System Management Review Template 09_0519 Page 2 of 12 Revision History: Rev. Description of Change A Initial Release 09_0519 Format changes made to template (in particular Section 7.0 CAR/PAR/IO reporting) and several edits for clarification and ease of reading. 11_0628 Modified template categories to reflect current process

57

Small Business Program Manager Directory  

Broader source: Energy.gov [DOE]

These Department of Energy Program Elements and offices, primarily located at DOE headquarters (Washington, DC and Germantown, Maryland), have small business points of contact referred to as Small Business Program Managers (SBPMs). SBPMs assist small businesses in marketing to their office/facility.

58

Legacy Management Sites | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

met and for providing related long-term surveillance and maintenance, records management, workforce restructuring and benefits continuity, property management, land use planning,...

59

DOE - Office of Legacy Management -- SiteA  

Office of Legacy Management (LM)

Illinois Illinois Site A/Plot M, Illinois, Decommissioned Reactor Site A D&D Program Site sitea_map As part of the DOE Defense Decontamination and Decommissioning (D&D) Program, the Office of Legacy Management manages the Site A/Plot M Decommissioned Reactor Site and ensures compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal DOE policies. The site transferred to the Office of Legacy Management in 2003 and requires routine inspection and maintenance, records-related activities, and stakeholder support. For more information about the Site A/Plot M site, view the fact sheet. Site Documents and Links Contact Us Inspection/Sampling Schedule Site A/Plot M Decommissioned Reactor Mapping and Monitoring (GEMS)

60

PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS  

Broader source: Energy.gov (indexed) [DOE]

-. -. ., ,-- -.' * PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM: ELECTRONIC RECORDS KEEPING SYSTEM PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1. Department of Energy Privacy Program, Appendix A. Privacy Impact Assessments. for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetext/neword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Deparbnental Element & Site . June 4, 2009 Office of Legacy Management, Morgantown, WV :;:~:f~~r~;;:reC: LM Records Handling System (LMRHS01) - Electronic Records Keeping System exhibit Project UID 019-10-01-31-02-1014-00

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS  

Broader source: Energy.gov (indexed) [DOE]

* PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM ROCKY FLATS ENVIRONMENTAL RECORDS DATABASE PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/o2061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element & Site June 4,2009 Office of Legacy Management, Morgantown, WV Name of Information LM Records Handling System (LMRHS01) - Rocky Flats Environmental Records System or IT Project Database exhibit Project UID 019-10-01-31-02-1014-00

62

PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS  

Broader source: Energy.gov (indexed) [DOE]

OFFICE OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM: ENERGY EMPLOYEES OCCUPATIONAL ILLNESS COMPENSATION PROGRAM ACT PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance Is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE I - PRIVACY NEEDS ASSESSMENT Date Departmental Element &Site June 4, 2009 Office of Legacy Management, Morgantown, WV Name of Information LM Records Handling System (LMRHS01) - Energy Employees Occupational Illness System or IT Project Compensation Program Act exhibit

63

PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS  

Broader source: Energy.gov (indexed) [DOE]

,. - -i * PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM: FERNALD HISTORICAL RECORDS SYSTEM PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/02061.pdf Please complete electronically: no hand-written slibmisslons will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Departmental Element & SIte· June 4, 2009 Office of Legacy Management, Morgantown, WV Name of Information System or IT Project LM Records Handling System (LMRHS01) - Fernald Historical Records System exhIbit Project UIO 019-10-01-31-02-1014-00

64

U.S. Department of Energy Office of Legacy Management  

Office of Legacy Management (LM)

U.S. Department of Energy Office of Legacy Management U.S. Department of Energy Office of Legacy Management LMS 3047FER Page 1 of 2 02/02/2010 Fernald Preserve Institutional Control Inspection Date Dec. 2011 Inspector SM Stoller Area Institutional Controls Type of Finding (See Definitions Page) Follow Up Institutional Control Signage Barrier Groundskeeping Other Description Photo? (File No.) Corrected Maintenance Req'd Cont. Observation Access Points South Access NO FINDINGS No North Access NO FINDINGS No Eco Park NO FINDINGS No Forest Demo NO FINDINGS No Perimeter Authorized Vehicle Access NO FINDINGS No Perimeter Signage NO FINDINGS No Fencing CAWWT X X Tree growing into chain link fence on north side. No X

65

PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS  

Broader source: Energy.gov (indexed) [DOE]

'" '" " * .1 * PRIVACY IMPACT ASSESSMENT: OFFICE OF LEGACY MANAGEMENT: RECORDS HANDLING SYSTEM: FREEDOM OF INFORMAnON ACT/ PRIVACY ACT PIA Template Version - May, 2009 Department of Energy Privacy Impact Assessment (PIA) Guidance is provided in the template. See DOE Order 206.1, Department of Energy Privacy Program, Appendix A, Privacy Impact Assessments, for requirements and additional guidance for conducting a PIA: http://www.directives.doe.gov/pdfs/doe/doetextlneword/206/02061.pdf Please complete electronically: no hand-written submissions will be accepted. This template may not be modified. MODULE 1- PRIVACY NEEDS ASSESSMENT Date Oeparbn~ntal Element" Site June 4, 2009 Office of Legacy Management, Morgantown, WV Name of Information System or IT Project LM Records Handling System (LMRHS01) - Freedom of Information Act/Privacy

66

Office of Legacy Management Designated as a High-Performing Organization |  

Broader source: Energy.gov (indexed) [DOE]

Office of Legacy Management Designated as a High-Performing Office of Legacy Management Designated as a High-Performing Organization Office of Legacy Management Designated as a High-Performing Organization July 6, 2009 - 11:45am Addthis Office of Legacy Management Designated as a High-Performing Organization What does this project do? Goal 5. Sustain management excellence Executive Summary: The U.S. Department of Energy (DOE) Office of Legacy Management (LM) was established in 2003 to serve as the steward for the nation's Cold War nuclear legacy. LM is responsible for the long-term surveillance and maintenance of environmental remedies, promotion of beneficial reuse, and management of records and information associated with over 70 former nuclear weapons production sites located in 26 states. LM is also responsible for the administration of contractor pension plans and

67

Office of Legacy Management … Post Competition Accountability Report  

Broader source: Energy.gov (indexed) [DOE]

Post Competition Accountability Quarterly Report: High Performing Organization Proposal 2012 This report serves as an official record of the quarterly cost, personnel, and performance information for the Office of Legacy Management to satisfy the post competition accountability requirements. Page 1 of 2 Fiscal Years (FY) 2012 - 2016: Reporting Period: First Quarter, FY2013 I. MANAGEMENT EXCELLENCE GOALS Cutting Waste (Improving Efficiency) 1. Limit Program Direction increases to levels allowed by OMB for inflation. 2. Comply with OMB guidance, OMB-M-12-12, Promoting Efficient Spending, regarding mission- related travel. Quarterly Cost Report Funded Activity HPO Plan Cost Adjusted Budget Cost (ABC) Estimated Actual Cost (EAC) Explanation for Differences

68

Voluntary Protection Program Onsite Review, Legacy Management Support Team- January 2012  

Broader source: Energy.gov [DOE]

Evaluation to determine whether Legacy Management Support Team is continuing to perform at a level deserving DOE-VPP Star recognition.

69

Office of Legacy Management (LM) Program Update, October¬タモDecember 2010  

Broader source: Energy.gov (indexed) [DOE]

0 0 - Visit us at www.lm.doe.gov Welcome to the October-December 2010 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management See page for a map of LM sites. 14 See page 15 for a more detailed version of LM's goals. Legacy Management Goals Goal 5 Office of Legacy Management Receives Management Award The U.S. Department of Energy (DOE) Office of Legacy Management (LM) was one of five DOE organizations to receive a DOE Management Award on October 6, 2010. The DOE Management Awards are presented to DOE personnel for outstanding contributions to energy, water, and vehicle fleet

70

Office of legacy management organized to ensure effective and efficient management of department of energy legacy responsibilities  

SciTech Connect (OSTI)

To further demonstrate its commitment to reducing the environmental consequences of past actions and expedite the cleanup of its sites, the U.S. Department of Energy (DOE) created the Office of Legacy Management (LM) as a stand-alone office in December 2003. LM is entrusted with playing a lead role in a Department-wide approach to monitor the investments at over one hundred sites across the country. To fulfill this role successfully, LM has established programmatic goals, which include assuming responsibility for records and information technology, restructuring the LM contractor workforce, and managing real property, some of which will be transferred to non-federal, beneficial reuse. (authors)

Carter, T. [U.S. Department of Energy Office of Legacy Management, Forrestal Building, Washington, DC (United States)

2007-07-01T23:59:59.000Z

71

PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE...  

Energy Savers [EERE]

SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS ENCLAVE PIA - INL SECURITY INFORMATION MANAGEMENT SYSTEM BUSINESS...

72

Office of Legacy Management: A High Performing Organization Effectively and Efficiently Managing the Department of Energy's Legacy Responsibilities  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is a designated high performing organization (HPO) that currently manages about 80 legacy sites across the country. LM achieved its HPO status through efforts that included reducing federal staffing levels by staff reassignment rather than reduction in force, reassigning federal staff to locations closer to the sites for which they are responsible, maintaining a higher-than-average diversity level, and reducing program direction requirements. The HPO achievement will save taxpayers about $15 million over 5 years; at the same time, LM will increase its program responsibilities and its efficiency of operations. The increased program responsibilities include managing over 100,000 cubic feet of physical records and 6 tera-bytes of electronic information, managing contractor pension plans and other long-term benefits, monitoring formerly contaminated sites to verify that remediation continues to be protective of human health and the environment, accepting new sites as they transfer into LM, and effecting the transfer or beneficial reuse of sites that no longer support an ongoing DOE mission. By the end of fiscal year 2008, LM will manage about 60,000 acres of federal property. (authors)

Owen, M.; Carter, T. [National Stakeholder Relations, U.S. Department of Energy Office of Legacy Management, Washington, DC (United States)

2008-07-01T23:59:59.000Z

73

DOE - Office of Legacy Management -- ITL  

Office of Legacy Management (LM)

New Mexico New Mexico Inhalation Toxicology Laboratory (ITL), New Mexico, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. Status of Pending Decision Documents Property Transfer (Section 13005) Public Law 111-11, 2009, Omnibus Public Land Management Act Quitclaim Deed that supports this document anticipated to be posted by end of September 2013 All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Other Documents Fact Sheet Inhalation Toxicology Laboratory (ITL), New Mexico, Site Fact Sheet June 11, 2012

74

Directory of Small Business Program Managers (SBPMs)  

Office of Environmental Management (EM)

Business Program Manager W: (720) 962-7154 F: (720) 962-7161 tetrault@wapa.gov Frank Armstrong Alternate Small Business Program Manager W: (720) 962-7163 F: (720) 962-7161...

75

Office of Legacy Management Designated as a High-Performing Organization |  

Broader source: Energy.gov (indexed) [DOE]

Office of Legacy Management Designated as a High-Performing Office of Legacy Management Designated as a High-Performing Organization Office of Legacy Management Designated as a High-Performing Organization July 6, 2009 - 11:45am Addthis What does this project do? Goal 5. Sustain management excellence Executive Summary: The U.S. Department of Energy (DOE) Office of Legacy Management (LM) was established in 2003 to serve as the steward for the nation's Cold War nuclear legacy. LM is responsible for the long-term surveillance and maintenance of environmental remedies, promotion of beneficial reuse, and management of records and information associated with over 70 former nuclear weapons production sites located in 26 states. LM is also responsible for the administration of contractor pension plans and post-retirement benefits for over 10,000 former contractor workers.

76

Roadmap: Business Management Technology Information Technology -Associate of Applied Business  

E-Print Network [OSTI]

Roadmap: Business Management Technology ­ Information Technology - Associate of Applied Business This roadmap is a recommended semester-by-semester plan of study for this major. However, courses Introduction to Management Technology 3 COMM 15000 Introduction to Human Communication 3 Fulfills Kent Core

Sheridan, Scott

77

Roadmap: Business Management Technology Computer Applications -Associate of Applied Business  

E-Print Network [OSTI]

Roadmap: Business Management Technology ­ Computer Applications - Associate of Applied Business [RE-AAB-BMRT-CMPA] Regional College Catalog Year: 2013-2014 Page 1 of 1 | Last Updated: 8-May-13/LNHD This roadmap to Management Technology 3 COMM 15000 Introduction to Human Communication 3 Fulfills Kent Core Additional

Sheridan, Scott

78

Legacy Management Work Progresses on Defense-Related Uranium Mines Report  

Broader source: Energy.gov (indexed) [DOE]

Legacy Management Work Progresses on Defense-Related Uranium Mines Legacy Management Work Progresses on Defense-Related Uranium Mines Report to Congress Legacy Management Work Progresses on Defense-Related Uranium Mines Report to Congress October 23, 2013 - 1:35pm Addthis What does this project do? Goal 4. Optimize the use of land and assets The U.S. Department of Energy Office of Legacy Management (LM) continues to work on a report to Congress regarding defense-related legacy uranium mines. LM was directed by the U.S. Congress in the National Defense Authorization Act for Fiscal Year 2013 to undertake a review of, and prepare a report on, abandoned uranium mines in the United States that provided uranium ore for atomic energy defense activities. The report is due to Congress by July 2014. LM is compiling uranium mine data from federal, state, and tribal agencies

79

DOE - Office of Legacy Management -- Edgemont Mill Site - SD 01  

Office of Legacy Management (LM)

Edgemont Mill Site - SD 01 Edgemont Mill Site - SD 01 FUSRAP Considered Sites Site: Edgemont Mill Site (SD.01) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Edgemont, South Dakota, Disposal Site Documents Related to Edgemont Mill Site 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites-Edgemont, South Dakota, Disposal Site. LMS/S09415. November 2012 U.S. Department of Energy 2008 UMTRCA Title II Sites Annual Report November 2008 Edgemont, South Dakota FACT SHEET Office of Legacy Management Edgemont, South Dakota, Disposal Site This fact sheet provides information about the Uranium Mill

80

DOE - Office of Legacy Management -- Rocky Flats Regulatory Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regulatory Documents Regulatory Documents Rocky Flats Site, Colorado Regulatory Documents All documents are Adobe Acrobat files. pdf_icon Notification that GS01 is no longer an RFLMA Point of Compliance (POC) Third Five-Year Review Report for the Rocky Flats Site Rocky Flats Legacy Management Agreement Environmental Covenant, November 14, 2011 Corrective Action Decision/Record of Decision Amendment for Rocky Flats Plant (USDOE) Central Operable Unit Proposed Plan for the Rocky Flats CAD/ROD Amendment (June 2011) Second Five-Year Review Report for the Rocky Flats Site Corrective Action Decision/Record of Decision for Rocky Flats Plant (USDOE) Peripheral Operable Unit and Central Operable Unit Rocky Flats Environmental Technology Site Proposed Plan Present Landfill Monitoring and Maintenance Plan

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Office of Legacy Management (LM) Program Update, April¬タモJune 2011  

Broader source: Energy.gov (indexed) [DOE]

p r i l - J u n e 2 0 1 1 p r i l - J u n e 2 0 1 1 Visit us at www.lm.doe.gov Welcome to the April-June 2011 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . lm@hq.doe.gov Program Update Legacy Management On May 31, 2011, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) completed

82

Legacy Management Work Progresses on Defense-Related Uranium...  

Broader source: Energy.gov (indexed) [DOE]

Most recently, LM visited 84 defense-related legacy uranium mine sites located within 11 uranium mining districts in 6 western states. At these sites, photographs and global...

83

Office of Legacy Management (LM) Program Update, October¬タモDecember 2009  

Broader source: Energy.gov (indexed) [DOE]

0 0 9 - Visit us at www.LM.doe.gov Welcome to the 2009 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update October-December LM@hq.doe.gov Program Update ENERGY Legacy Management U.S. DEPARTMENT OF See page for a map of LM sites. 14 See page 15 for a more detailed version of LM's goals. Legacy Management Goals The first goal of the U.S. Department of Energy Office of Legacy Management (LM) is to protect human health and the environment through effective and efficient long-term surveillance and maintenance at LM sites. At LM's Rocky Flats Site, a key component in meeting that goal is ensuring that the four groundwater treatment systems continue to remove groundwater contamination before it can impact the site's surface waters.

84

Assessing the Potential for Renewable Energy Development on DOE Legacy Management Lands  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Legacy Management Legacy Management DOE/GO-102008-2435 February 2008 Assessing the Potential for Renewable Energy Development on DOE Legacy Management Lands Puerto Rico Alaska Assessing the Potential for Renewable Energy Development on DOE Legacy Management Lands Authors: Doug Dahle, Dennis Elliott, Donna Heimiller, Mark Mehos, Robi Robichaud, Marc Schwartz, Byron Stafford, and Andy Walker Published by National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by the Midwest Research Institute * Battelle DOE/GO-102008-2435 February 2008 NOTICE This report was prepared as an account of work sponsored by an agency of the United States

85

DOE - Office of Legacy Management -- Fernald Environmental Management  

Office of Legacy Management (LM)

Fernald Environmental Management Fernald Environmental Management Project - 027 FUSRAP Considered Sites Site: Fernald Environmental Management Project (027) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Fernald Environmental Management Project (FEMP), formerly known as the Feed Materials Production Center, is located about 18 miles northwest of Cincinnati, Ohio. The facility produced uranium metal products between 1953 and 1989 for use in production reactors to make plutonium and tritium at other Department of Energy (DOE) sites in support of United States defense programs. Uranium metal production ended in July 1989 and resources shifted

86

Office of Legacy Management (LM) Program Update: July¬タモSeptember 2012  

Broader source: Energy.gov (indexed) [DOE]

2 2 Visit us at www.lm.doe.gov Welcome to the July-September 2012 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Program Update. This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . lm@hq.doe.gov Program Update Legacy Management Goal 2 LM Communication and Stakeholder Satisfaction Independent Survey

87

Farm and Ranch Business Management Functions  

E-Print Network [OSTI]

This publication discussess several management functions, including organization, staffing and direction and control. Suggested activities help managers learn how to implement these functions in their farm and ranch businesses....

McCorkle, Dean; Anderson, David P.

2009-02-04T23:59:59.000Z

88

Directory of Small Business Program Managers (SBPMs)  

Broader source: Energy.gov (indexed) [DOE]

smallbusiness.energy.gov smallbusiness.energy.gov Office of Small and Disadvantaged Business Utilization (OSDBU) U.S. Department of Energy Office of Small and Disadvantaged Business Utilization 1000 Independence Ave., SW Washington, DC 20585 DIRECTORY OF SMALL BUSINESS PROGRAM MANAGERS (SBPMs) Section I CONTENTS Headquarters Program Elements/Offices ....................................................... Section I Contracting Activities/Offices ........................................................................ Section II Facility Management Contractors (FMCs) .................................................... Section III

89

Financial Management: The Key to Farm-Firm Business Management  

E-Print Network [OSTI]

Those who succeed will manage their operations as farm/ranch businesses, with more emphasis on recordkeeping, planning, profitability analysis and repayment-based financing, and with better production and business monitoring and controls...

Pena, Jose G.; Klinefelter, Danny A.

2008-10-17T23:59:59.000Z

90

Environmental Management Consolidated Business Center (EMCBC) | Department  

Broader source: Energy.gov (indexed) [DOE]

Environmental Management Consolidated Business Center (EMCBC) Environmental Management Consolidated Business Center (EMCBC) Environmental Management Consolidated Business Center (EMCBC) Environmental Management Consolidated Business Center (EMCBC) SITE OVERVIEW The Department of Energy (DOE) established the EMCBC in Cincinnati, OH, on June 7, 2004, to provide Environmental Management customers with required and improved business and technical support services. Establishing the EMCBC allowed EM's Closure Sites, small sites and large sites, EM and DOE Headquarters, and other (i.e., non-EM) Departmental elements to consolidate many of the functions necessary to support EM's mission. By consolidating these functions in one centralized location, EM has reduced redundancies of services being performed at each individual site. The consolidation of

91

Report: Small Business, Acquisition, and Project Management  

Broader source: Energy.gov (indexed) [DOE]

SMALL BUSINESS, ACQUISITION, AND PROJECT MANAGEMENT SMALL BUSINESS, ACQUISITION, AND PROJECT MANAGEMENT Background In FY 2007 EMAB was tasked to dialogue with the Office of Acquisition and Project Management (EM-50) on the topic of Small Business and provide advice and recommendations drawn from EMAB members' experience in commercial industry. Additionally, EMAB continued to review and discuss the topics of Acquisition and Project Management during its public meetings and in exchanges with EM senior personnel. Discussion In FY 2006, EM's small business prime contract goal of $208 million was exceeded by well over $100 million. The FY 2007 goal was $198 million, and once again, the program was poised to exceed that mark. Statistically, EM's execution of its small business acquisition strategy is commendable; however, EMAB has a number of

92

Office of Information and Business Management | Department of...  

Office of Environmental Management (EM)

Business Management Office of Information and Business Management OIBM provides the foundation to propel the Office of Energy Efficiency and Renewable Energy (EERE) toward...

93

Office of Legacy Management (LM) Program Update, July¬タモSeptember 2011  

Broader source: Energy.gov (indexed) [DOE]

1 1 - Visit us at www.lm.doe.gov Welcome to the July-September 2011 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management On July 27, 2011, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) completed the long-term monitoring of Amchitka Island, an event that occurs once every 5 years. To say that Amchitka Island, part of the southeastern part of the Aleutian Island chain of Alaska, is the most remote LM site is no understatement. "The site is so far west that it's actually in the eastern hemisphere!" says Mark Kautsky, the LM Site Manager for the former nuclear test site on

94

Diploma in Management Internet Business concentration  

E-Print Network [OSTI]

, telecommunications, the internet and the Web as well as a good understanding of consumer behaviour. Our internet1 Diploma in Management Internet Business concentration Looking for a Career in Internet Business? Since the past decade, internet and web-based technologies have evolved to become a fundamental part

Pientka, Brigitte

95

Federal Energy Management Program: Business Case for Sustainable Design in  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Case for Business Case for Sustainable Design in Federal Facilities to someone by E-mail Share Federal Energy Management Program: Business Case for Sustainable Design in Federal Facilities on Facebook Tweet about Federal Energy Management Program: Business Case for Sustainable Design in Federal Facilities on Twitter Bookmark Federal Energy Management Program: Business Case for Sustainable Design in Federal Facilities on Google Bookmark Federal Energy Management Program: Business Case for Sustainable Design in Federal Facilities on Delicious Rank Federal Energy Management Program: Business Case for Sustainable Design in Federal Facilities on Digg Find More places to share Federal Energy Management Program: Business Case for Sustainable Design in Federal Facilities on

96

Office of Legacy Management (LM) Program Update, January¬タモMarch 2012  

Broader source: Energy.gov (indexed) [DOE]

2 2 - Visit us at www.lm.doe.gov Welcome to the January-March 2012 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management In February 2011, the Office of Legacy Management (LM) began work as part of an interagency effort to develop a design for the disposal of material from the Northeast Church Rock (NECR) mine. The proposed plan is to dispose of approximately 1 million cubic yards of mine-related material at the Church Rock Uranium Mill Tailings Radiation Control Act (UMTRCA) Title II site in New Mexico. The U.S. Environmental Protection Agency (EPA) first discussed the idea with

97

Office of Legacy Management (LM) Program Update, April¬タモJune 2010  

Broader source: Energy.gov (indexed) [DOE]

0 0 - Visit us at www.LM.doe.gov Welcome to the April-June 2010 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update LM@hq.doe.gov Program Update ENERGY Legacy Management U.S. DEPARTMENT OF See page for a map of LM sites. 10 See page 11 for a more detailed version of LM's goals. Legacy Management Goals Goal 5 Native American Cultural Awareness Training Ray Plieness; Audie Greybear; Debbie Martinez; Levon Benally, Jr.; David Taylor; Stephen Etsitty; and David Geiser at the Native American Cultural Awareness Training. Continued on page 3 David Geiser, Danny Joseph, Ray Plieness, Audie Greybear, and Norman Honie at the Native

98

Office of Legacy Management (LM) Program Update, April¬タモJune 2012  

Broader source: Energy.gov (indexed) [DOE]

2 2 - Visit us at www.lm.doe.gov Welcome to the April-June 2012 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management U.S. Representative Scott Tipton of Colorado's 3rd Congressional District visited the U.S. Department of Energy Office of Legacy Management (LM) Grand Junction, site in Colorado in early May. The Congressman, accompanied by his representatives Brian Meinhart and Richard Schoenradt, requested to visit the site as part of a recent trip to western Colorado in an effort to gain an understanding of the work LM conducts and to meet some of the employees who perform the work.

99

Program or Field Office: Office of Legacy Management U.S. Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Office of Legacy Management Office of Legacy Management U.S. Department of Energy Categorical Exclusion Determination Form Office of Legacy Management * Project Title and 1.0 . No.: Monitoring , maintenance, environmental and biological sampling , and administrative actions on Amchitka and Adak Islands, Aleutian Islands, Alaska. LM No.16-11 . Location: Amchitka and Adak Islands, Alaska Proposed Action or Proj ect Description : This determination form provides the results of an evaluation of potential impacts related to various monitoring and maintenance actions on Amchitka Island and to non-routine collection of environmental and biological samples on and offshore of Amchitka and Adak Islands. DOE is committed to the collection of environmental and biological samples to test

100

Office of Legacy Management (LM) Program Update, April¬タモJune 2009  

Broader source: Energy.gov (indexed) [DOE]

0 0 9 - Visit us at www.LM.doe.gov Welcome to the 2009 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update April-June LM@hq.doe.gov Program Update ENERGY Legacy Management U.S. DEPARTMENT OF Goal 1 Draft Path Forward Report for the Rulison Nuclear Explosion Site Available for Review The Office of Legacy Management (LM) released the draft Rulison Path Forward report to the public on June 25, 2009. LM developed the path forward report as a guidance document for Colorado state regulators and other interested stakeholders in response to increased drilling for natural gas reserves near the underground nuclear explosion site at Rulison, Colorado. Project Rulison was the second natural gas reservoir stimulation

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Office of Legacy Management (LM) Program Update, January¬タモMarch 2009  

Broader source: Energy.gov (indexed) [DOE]

0 0 9 - Visit us at www.LM.doe.gov Welcome to the 2009 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update January-March LM@hq.doe.gov Program Update ENERGY Legacy Management U.S. DEPARTMENT OF See page 11 for a more detailed version of LM's goals. Legacy Management Goals Goal 1 Department of Energy Co-Sponsors Environmental Justice Conference The Department of Energy (DOE or Department) and U.S. Environmental Protection Agency have signed a Memorandum of Understanding (MOU) with Environ- mental Justice Conference, Inc. to jointly plan and conduct "The Third Annual State of Environmental Justice in America 2009 Conference". The Conference will convene May 27 through 29, 2009, at the Howard University

102

Legacy Initiatives - EERE Commercialization Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Legacy Initiatives Small Business and Clean Energy Alliance (CEA) Partnership The U.S. Department of Energy (DOE) Small Business and Clean Energy Alliance (CEA) Partnership...

103

Office of Legacy Management: The First Five Years FY 2004¬タモ2008  

Broader source: Energy.gov (indexed) [DOE]

S S . D E PA R T M E NT O F U. S . D E PA R T M E NT O F ENERGY ENERGY Managing Today's Change, Protecting Tomorrow's Future Managing Today's Change, Protecting Tomorrow's Future DOE/LM-1461 Office of Legacy Management FY 2004-2008 The First Five Years Front cover photos top to bottom: Rocky Flats, Colorado, site and the Fernald Preserve Visitors Center in Ohio. Back cover photos top to bottom: Pinellas, Florida, site and the Rifle, Colorado, site. This report covers the time period from December 2003 (FY 2004) through September 2008 (FY 2008). DOE/LM-1461 December 2008 www.LM.doe.gov Office of Legacy Management The First Five Years FY 2004-2008 ENERGY Office of Legacy Management U.S. DEPARTMENT OF Letter From the Director The U.S. Department of Energy (DOE) established the Office of Legacy Management (LM) on December 15, 2003, to provide a long-term, sustainable solution

104

Business Manangement System(BMS), RL-2008/Project Hanford Management...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Business Manangement System(BMS), RL-2008Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008...

105

Office of Legacy Management (LM) Program Update, July¬タモSeptember 2010  

Broader source: Energy.gov (indexed) [DOE]

0 0 - Visit us at www.LM.doe.gov Welcome to the July-September 2010 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update LM@hq.doe.gov Program Update ENERGY Legacy Management U.S. DEPARTMENT OF See page for a map of LM sites. 12 See page 13 for a more detailed version of LM's goals. Legacy Management Goals Continued on page 3 Goal 5 Draft LM Strategic Plan Available for Review The draft is available for public comment through November 30, 2010. The mission, vision, and operating principles and the goals and objectives of the draft Strategic Plan are included in this edition of the on page 5. U.S. Department of Energy Office of Legacy Management Strategic Plan: 2010-2020 Program Update Continued on page 5 Goal 1 Public Access Established for the

106

Small Business Manager Oak Ridge National Laboratory  

E-Print Network [OSTI]

Keith Joy Small Business Manager Oak Ridge National Laboratory: Past, Present, and Future #12;2 OAK was the world's first continuously operated nuclear reactor Oak Ridge National Laboratory evolved from the Manhattan Project 2 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Overview_0604 #12;3 OAK RIDGE

107

Business Process Management: A Comprehensive Survey  

E-Print Network [OSTI]

. Business Process Management (BPM) research resulted in a plethora of methods, techniques, and tools aims to structure these results and provides an overview of the state-of-the-art in BPM. In BPM the con, the introduction of BPM technology has both managerial and technical ramifications, and may enable significant

van der Aalst, Wil

108

Roadmap: Business Management Technology General Management, Entrepreneurship and Manufacturing -Associate of Applied Business  

E-Print Network [OSTI]

Roadmap: Business Management Technology ­ General Management, Entrepreneurship and Manufacturing Updated: 8-May-13/LNHD This roadmap is a recommended semester-by-semester plan of study for this major Mathematics and Critical Reasoning BMRT 11009 Introduction to Management Technology 3 COMM 15000 Introduction

Sheridan, Scott

109

U.S. Department of Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012  

Broader source: Energy.gov (indexed) [DOE]

Energy, Office of Legacy Management Energy, Office of Legacy Management Post Competition Accountability Report: High Performing Organization Proposal May 2012 This report serves as an official record of the annual cost, personnel, and performance information for the Office of Legacy Management to satisfy the post competition accountability requirements. Reporting Period: Fiscal Years (FY) 2012 - 2016 FY2013 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016 1. Achieve EMS/Sustainability Goals (normalized to the number of legacy sites). Be a leader among DOE offices in sustainability.* Annual   2. Publish Post Competition Accountability Report on the LM internet. Quarterly   3. Conduct independent evaluations of key programs, projects, or technical issues by goal

110

Guidance for Developing and Implementing Institutional Controls for Long-Term Surveillance and Maintenance at DOE Legacy Management Sites  

Broader source: Energy.gov [DOE]

This guidance document is to help U.S. Department of Energy (DOE) Office of Legacy Management (LM) personnel understand what is necessary and acceptable for implementing the provisions of DOE...

111

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Broader source: Energy.gov (indexed) [DOE]

2-10 2-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Install wells and boreholes at the Old Rifle, CO, Processing Site A. Brief Project/Activity Description The Environmental Remediation Sciences Program (ERSP) proposes to install 36 wells and 5 boreholes on the Old Rifle, CO, Processing Site. A combination of 13 injection wells, 18 monitoring wells, 5 multi-chambered wells, and 5 boreholes would be installed using a sonic rotary drill rig. Five of the wells would be used for U.S. Department of Energy (DOE) Office of Legacy Management (LM) groundwater monitoring purposes and the remainder (31 wells and 5 boreholes) would be installed in a single gallery (Super 8) to be used for research and monitoring

112

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Broader source: Energy.gov (indexed) [DOE]

29-10 29-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Install monitoring wells at the Slick Rock West, Colorado, Processing Site A. Brief Project/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes to abandon groundwater monitoring well 0318 and install three new groundwater monitoring wells at the Slick Rock West, Colorado, Processing Site. The attached map shows the well locations. Existing well 0318 would be replaced with well 0318A. The well would be abandoned because either the screen or casing has broken. Well 0318 has 3 feet (ft) of sand inside the casing and about 1 ft of water above the sand, and would be abandoned according to State of Colorado well

113

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Broader source: Energy.gov (indexed) [DOE]

25-10 25-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Reclamation Projects on Slick Rock Lease Tract C-SR-II, Uranium Leasing Program A. BriefProject/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes various reclamation activities related to abandoned mines and mine features that constitute a public safety concern. Independent contractors associated with the lessee (Cotter Corporation) and under supervision of uranium leasing program (ULP) personnel would complete the work, and all projects would be completed within approximately 3 weeks. C-SR-ll is located in southwestern San Miguel County, Colorado. The total estimated surface disturbance would cover 3 acres.

114

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Broader source: Energy.gov (indexed) [DOE]

I.D. # LM 27-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Reclamation Projects in Lease Tract C-G-26, Uranium Leasing Program A. Brief Proj ect/ Activity Description The U.S. Department Of Energy (DOE) Office of Legacy Management (LM) proposes to reclaim mining features associated with abandoned mines inherited by LM as a result of realigning lease tract boundaries in 2007. The activities include closing mine portals, filling subsided areas, and closing shafts and vents. Independent contractors associated with Energy Fuels Resources, the leaseholder, would complete all work in an estimated 1 week in 2010. The presence of these features constitute a public and wildlife safety concern. This

115

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Broader source: Energy.gov (indexed) [DOE]

26-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Reclamation Projects on Wedding Bell Mountain Lease Tract C-WM-17, Uranium Leasing Program A. BriefProject/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management (LM) proposes several minor reclamation activities related to abandoned mines and mine features that pose a public safety concern. In 2007, LM inherited abandoned mines as a result of re-aligning lease tract boundaries.1pdependent contractors associated with the lessee (Golden Eagle Uranium) and under the supervision of uranium leasing program personnel would complete the work, and all projects would be completed within approximately 2 days. The Wedding Bell Mountain Lease

116

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist  

Broader source: Energy.gov (indexed) [DOE]

3-10 3-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist Project/Activity: Install a test cover at Grand Junction, CO, Disposal Site . A. Brief Project/Activity Description The U.S. Department of Energy (DOE) Office of Legacy Management eLM) proposes to install a 70 foot (ft) x 140 ft test cover that duplicates the top 42 inches of the existing cover at the Grand Junction, CO, Disposal Site. The purpose of the test cover is to evaluate methods for renovating low-permeability disposal cell covers and to measure the effects of renovation on soil hydraulic properties and seedbed ecology. The test cover would be constructed on the surface of an existing stockpile of clay soil and would be located approximately 100 ft from an existing access

117

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Broader source: Energy.gov (indexed) [DOE]

14-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Install demonstration wind turbine at Weldon Spring, MO, Site A. Brief Project/Activity Description The U.S. Depatiment of Energy Office of Legacy Management proposes to install a small (6 to 9 feet [ft] diameter) wind turbine near the Interpretive Center on the Weldon Spring Site. The wind turbine would be pole-mounted with a final height of20 to 30 ft above the ground surface. The turbine would be considered a small demonstration project to show the public practical home use of wind energy, and it would also correlate with a larger permanent renewable energy display within the Interpretivc Center. The wind turbine is expected to produce enough energy to run the

118

Categorical Exclusion Determination Form Program or Field Office: Office of Legacy Management  

Broader source: Energy.gov (indexed) [DOE]

Office of Legacy Management Office of Legacy Management Project Title: Routine monitoring, maintenance, and administrative actions at the Salmon, MS, Site Location: Mississippi Proposed Action or Project Description: American Recovery and Reinvestment Act: D The proposed activities include an annual site visit, annual groundwater and surface water sample collection, the addition of a water access tube to one groundwater monitoring well, and general administrative actions. Categorical Exclusion(s) Applied: 83.1 Site characterization/environmental monitoring A8 Award of contracts for technical supporUmanagement and operation/personal services; A9 Information gathering/data analysis/document preparation/dissemination A 11 Technical advice and assistance to organizations *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of 10 CFRIO 21 Click Here

119

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist  

Broader source: Energy.gov (indexed) [DOE]

D. # LM-lS-lO D. # LM-lS-lO U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checklist Project/Activity: Install geotechnical holes at the Lakeview, OR, Disposal Site A. Brief Project/Activity Description The U.S. DepaJiment of Energy (DOE) Office of Legacy Management (LM) proposes to advance six direct-push geotechnical holes into the top of the Lakeview Disposal Cell and two geotechnical holes into the side slopes of the Lakeview Disposal Cell to determine moisture conditions within the cell. The holes would be hydraulically pushed 10 to 55 feet (ft) into the cell using a geoprobe rig. To ensure protection of the 2-ft-thick compacted clay barrier beneath the tailings, hole locations and depths would be limited so as to not extend within 10 ft of the base of the tailings. A plan that

120

Office of Legacy Management (LM) Program Update, January¬タモMarch 2011  

Broader source: Energy.gov (indexed) [DOE]

1 1 - Visit us at www.lm.doe.gov Welcome to the January-March 2011 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to . Program Update lm@hq.doe.gov Program Update Legacy Management Contracts were recently awarded to two charter vessels that will transport equipment and personnel to the island of Amchitka, Alaska, for the 2011 biological sampling and post-inspection monitoring expeditions. Amchitka is a remote island in the western Aleutian Islands, approximately 1,600 miles southwest of Anchorage, Alaska, where three underground nuclear tests, Projects Long Shot, Milrow, and Cannikin, were conducted by the United States Atomic Energy Commission and Defense Department

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist  

Broader source: Energy.gov (indexed) [DOE]

JO-IO JO-IO U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist Project/Activity: Geophysical and Seismic Investigations at the Shoal, NY, Site A. Brief Project/Activity Descl'iption The U.S. Department of Energy (DOE) Office of Legacy Management (LM) needs to further characterize the water table, evaluate the prevailing horizontal groundwater flow direction, and identify faults/major fracture zones that may affect groundwater flow and contaminant transport at the Shoal Site. The Shoal Site is located about 40 miles by road from Fallon, in Churchill County, NY. This environmental checklist evaluates two related geophysical activities. The initial geophysical work would consist of conducting a controlled-source audio

122

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist  

Broader source: Energy.gov (indexed) [DOE]

28-10 28-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist Project/Activity: New Verde Mine Investigations, Lease Tract C-G-26, Uranium Leasing Program A. Brief Project/Activity Description Energy Fuels Resources Corporation (EFRC), lessee to the U.S. Department of Energy Office of Legacy Management, proposes to evaluate former mine workings associated with the New Verde Mine on Lease Tract C-G-26 in preparation for potential future mine development. This lease tract is on Calamity Mesa, along the southern flank of the Uncompahgre Plateau in southwestern Mesa County. The mine site would be accessed by workers on a former mine access road and on public roads. A bulkhead, approximately 6 feet (ft) high and 9 ft wide, was constructed of concrete blocks in 1996 to seal the

123

Office of Legacy Management (LM) Program Update, January¬タモMarch 2010  

Broader source: Energy.gov (indexed) [DOE]

0 0 - Visit us at www.LM.doe.gov Welcome to the January-March 2010 issue of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) . This publication is designed to provide a status of activities within LM. Please direct all comments and inquiries to LM@hq.doe.gov. Program Update Program Update ENERGY Legacy Management U.S. DEPARTMENT OF See page for a map of LM sites. 10 See page 11 for a more detailed version of LM's goals. Legacy Management Goals Goal 1 LM Installs a Solar Photovoltaic System at Tuba City Disposal Site A grid-tied solar photovoltaic system was installed at the Tuba City, Arizona, water treatment plant six miles north of Tuba City. The estimated annual production from the 51 kW array is 80,000 kWh. Three hundred solar panels are arranged in four arrays that feed nine inverters. The inverters change the 270-volt DC electricity from the solar

124

Maintenance at DOE Legacy Management Sites Weldon Spring...  

Energy Savers [EERE]

addressed by ICs. The site management plan establishes the entire program for postclosure care. It should reference administrative systems that support protectiveness, such as...

125

DOE - Office of Legacy Management -- Lawrence Berkeley National...  

Office of Legacy Management (LM)

of Energy for a wide range of energy related research activities. The Office of Science is the Department of Energy landlord for the Laboratory. The Environmental Management...

126

Business  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Business Business1354608000000BusinessSome of these resources are LANL-only and will require Remote Access./No/Questions? 667-5809library@lanl.gov Business Some of these resources are LANL-only and will require Remote Access. Key Resources Reference Organizations Journals Key Resources ABI/INFORM Research: Business periodicals Articles on business conditions, trends, management techniques, marketing, economics, human resources, finance, computers, and more; many with full-text Business.gov : the Business Gateway to Federal Resources Business collections, news National Technology Transfer Center Provides expert experience in a variety of areas, including: Intellectual Property Management, Engineering, Computer/Database Development, etc. RFE: Resources for Economists on the Internet

127

Contract Administration & Business Management | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Contract Administration & Business Management | National Nuclear Security Contract Administration & Business Management | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Contract Administration & Business Management Home > Field Offices > Welcome to the Sandia Field Office > Contract Administration & Business Management

128

Program or Field Office: Office of Legacy Management  

Broader source: Energy.gov (indexed) [DOE]

Building Space Modifications and Security Improvements, and Related Activities for the Building Space Modifications and Security Improvements, and Related Activities for the Westminster, Colorado, Office Location. LM # 07-12. Location: Westminster, Colorado Proposed Action or Project Description: DOE currently occupies approximately 16,000 square feet of leased space in the Walnut Creek Business Park in Westminster, Colorado. Modifications and improvements to the leased space are needed. Recommendations from a recent security evaluation included installing motion sensors and security cameras on the front and back of the building. The landlord will be providing this upgrade for the building; DOE proposes added safety measures such as installation of card readers at the doors and additional exterior lighting or cameras also may be made after evaluation and discussion

129

DOE - Office of Legacy Management -- Inhalation Toxicology Research  

Office of Legacy Management (LM)

Inhalation Toxicology Research Inhalation Toxicology Research Institute - 020 FUSRAP Considered Sites Site: Inhalation Toxicology Research Institute (020) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This facility is owned by the Department of Energy and is located on land the U. S. Air Force leases to the Department of Energy. The Department of Energy Albuquerque Operations Office¿s Environmental Management program has performed the clean-up activities at this facility. The clean-up activities were completed in 1996. Albuquerque Operations Office is currently performing monitoring and surveillance which is expected to

130

DOE - Office of Legacy Management -- Hoe Creek Underground Coal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hoe Creek Underground Coal Hoe Creek Underground Coal Gasification Site - 045 FUSRAP Considered Sites Site: Hoe Creek Underground Coal Gasification Site (045) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Hoe Creek Underground Gasification site occupies 80 acres of land located in Campbell County, Wyoming. The site was used to investigate the process and environmental parameters of underground coal gasification technologies in the 1970s. The Department of Energy¿s (DOE) current mission is limited to completing environmental remediation activities at the site. This property is owned by the Bureau of Land Management (BLM),

131

DOE - Office of Legacy Management -- Sandia National Laboratories - New  

Office of Legacy Management (LM)

New New Mexico - 018 FUSRAP Considered Sites Site: Sandia National Laboratories - New Mexico (018) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is a Department of Energy multi-program national laboratory with research and development programs in a broad range of scientific and technical fields. The Department of Energy Albuquerque Operation Office's Environmental Management program is responsible for assessing and cleaning up environmental contamination at Sandia that has occurred from a wide variety of historical activities. The National Nuclear Security Administration is the site landlord and will be responsible for Long Term

132

Office of Information and Business Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Information and Business Management Information and Business Management Office of Information and Business Management OIBM provides the foundation to propel the Office of Energy Efficiency and Renewable Energy (EERE) toward achieving its strategic goal of rapid and successful commercialization of EERE technologies. This foundation is comprised of meaningful portfolio management support, enterprise compliance, and an agile information technology suite of tools. This includes the following: Conducting assessments of EERE programs and management approaches and formulating findings, recommendations, and action plans to improve the effectiveness and efficiency of EERE's management of programs. Partnering across EERE, the Department of Energy (DOE), and industry to implement more effective portfolio, program, and project management.

133

V-180: IBM Application Manager For Smart Business Multiple Vulnerabilities  

Broader source: Energy.gov (indexed) [DOE]

V-180: IBM Application Manager For Smart Business Multiple V-180: IBM Application Manager For Smart Business Multiple Vulnerabilities V-180: IBM Application Manager For Smart Business Multiple Vulnerabilities June 18, 2013 - 12:38am Addthis PROBLEM: IBM Application Manager For Smart Business Multiple Vulnerabilities PLATFORM: IBM Application Manager For Smart Business 1.x ABSTRACT: A security issue and multiple vulnerabilities have been reported in IBM Application Manager For Smart Business REFERENCE LINKS: Security Bulletin 1640752 Secunia Advisory SA53844 CVE-2012-1531 CVE-2012-1532 CVE-2012-1533 CVE-2012-2190 CVE-2012-2191 CVE-2012-2203 CVE-2012-3143 CVE-2012-3159 CVE-2012-3216 CVE-2012-4820 CVE-2012-4821 CVE-2012-4822 CVE-2012-4823 CVE-2012-5068 CVE-2012-5069 CVE-2012-5071 CVE-2012-5072 CVE-2012-5073 CVE-2012-5075 CVE-2012-5079

134

DOE - Office of Legacy Management -- Nevada Test Site - 023  

Office of Legacy Management (LM)

Nevada Test Site - 023 Nevada Test Site - 023 FUSRAP Considered Sites Site: Nevada Test Site (023) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Nevada Test Site was established by the Atomic Energy Commission in the 1950's to conduct field testing of nuclear explosives in connection with the research and development of nuclear weapons. The environmental management activities for this site are under the purview of the Department of Energy¿s Nevada Operations Office. The National Nuclear Security Administration is the site landlord and will be responsible for Long Term Stewardship. Also see Documents Related to Nevada Test Site

135

DOE - Office of Legacy Management -- Rocky Flats SOG  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SOG SOG Rocky Flats Site, Colorado Rocky Flats, Colorado, Site Operations Guide All documents are Adobe Acrobat files. pdf_icon Site Operations Guide Appendixes Appendix A: Annual Site Inspection Checklist Appendix B: Example Contact Record Appendix C: Rocky Flats Site Soil Disturbance Evaluation Procedure Appendix D: Site-Specific Checklist Appendix E: Rocky Flats, Colorado, Site Erosion Control Monitoring and Maintenance Inspection Procedure Appendix F: Erosion Control Plan for Rocky Flats Property Central Operable Unit Appendix G: Wildland Fire Management Plan for the Rocky Flats, Colorado, Site Appendix H: Emergency Response Plan for the Rocky Flats Site Dams Appendix I: Additional Field Implementation Detail for Selected Monitoring Objectives Historic documents may contain links to outside sources. LM cannot attest

136

DOE - Office of Legacy Management -- Nuclear Metals Inc - MA 09  

Office of Legacy Management (LM)

Metals Inc - MA 09 Metals Inc - MA 09 FUSRAP Considered Sites Site: NUCLEAR METALS, INC. (MA.09) Eliminated from consideration under FUSRAP - Licensed facility - included in NRC action plan (Site Decommissioning Management Plan) in 1990 for cleanup Designated Name: Not Designated Alternate Name: None Location: 1555 Massachusetts Ave. , Cambridge , Massachusetts MA.09-2 Evaluation Year: 1987 MA.09-1 Site Operations: Produced natural uranium tubes for Savannah River reactor program and fabricated power reactor fuel elements under AEC/NRC license. MA.09-4 MA.09-3 Site Disposition: Eliminated - No Authority under FUSRAP - AEC licensed operation MA.09-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium MA.09-1 Radiological Survey(s): None Indicated

137

Anaheim Public Utilities - Small Business Energy Management Assistance  

Broader source: Energy.gov (indexed) [DOE]

Anaheim Public Utilities - Small Business Energy Management Anaheim Public Utilities - Small Business Energy Management Assistance Program Anaheim Public Utilities - Small Business Energy Management Assistance Program < Back Eligibility Commercial Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Commercial Lighting Lighting Maximum Rebate T8 Fluorescent lights, electronic ballasts and controls: 5,000 Programmable thermostats: 800 Program Info State California Program Type Utility Rebate Program Rebate Amount T8 Fluorescent lights, electronic ballasts and controls: 75% of the cost Refrigeration and A/C tune-up: free Programmable thermostats: free Expert energy survey: free Provider Anaheim Public Utilities The Small Business Energy Management System Program provides participating

138

EM Supports Department's Small Business Commitment at Waste Management...  

Broader source: Energy.gov (indexed) [DOE]

Bahan from the Environmental Management Consolidated Business Center in Cincinnati and Kelly Brazil from the Office of River Protection at the Hanford site in Washington state....

139

Business Manangement System(BMS), RL-2008/Project Hanford Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Manangement System(BMS), RL-2008/Project Hanford Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer Business Manangement System(BMS), RL-2008/Project Hanford Management Contract PHMC (Flour), Office of the Chief Information Officer More Documents & Publications iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management PIA - Security Clearance Work Tracking and Budget System Office of Personnel Management (OPM) Billing System PIA, Office of Health,

140

Roadmap: Business Management Technology Marketing and Sales Associate of Applied Business  

E-Print Network [OSTI]

Roadmap: Business Management Technology ­ Marketing and Sales ­ Associate of Applied Business [RE-AAB-BMRT-MKSL] Regional College Catalog Year: 2012-2013 Page 1 of 1 | Last Updated: 12-Mar-12/LNHD This roadmap Introduction to Management Technology 3 COMM 15000 Introduction to Human Communication 3 Fulfills Kent Core

Sheridan, Scott

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Roadmap: Business Management Technology Marketing and Sales Associate of Applied Business  

E-Print Network [OSTI]

Roadmap: Business Management Technology ­ Marketing and Sales ­ Associate of Applied Business [RE-AAB-BMRT-MKSL] Regional College Catalog Year: 2013-2014 Page 1 of 1 | Last Updated: 11-Apr-13/LNHD This roadmap 11009 Introduction to Management Technology 3 COMM 15000 Introduction to Human Communication 3 Fulfills

Sheridan, Scott

142

SERVICE ORIENTED ARCHITECTURES FOR BUSINESS PROCESS MANAGEMENT SYSTEMS  

E-Print Network [OSTI]

SERVICE ORIENTED ARCHITECTURES FOR BUSINESS PROCESS MANAGEMENT SYSTEMS ABSTRACT The integration of research in the area of Service Oriented Architectures (SOA) with current methodologies and tools of on-going research in the application of Service Oriented Architectures in Business Process Management

Marchese, Maurizio

143

Investigating the Effort of Using Business Process Management Technology  

E-Print Network [OSTI]

-Franck-Ring, 89069 Ulm, Germany Abstract Business Process Management (BPM) technology has become an important aspects and effects of BPM technology and BPM tools. Key words: Process-aware Information System, Workflow (e.g., WS-BPEL, BPMN), and business process manage- ment (BPM) tools (e.g., Tibco Staffware, FLOWer

Ulm, Universität

144

Office of Legacy Management (LM) Program Update, October¬タモDecember 2011  

Broader source: Energy.gov (indexed) [DOE]

Fernald Preserve in Harrison, Ohio, hosted a workers reunion Fernald Preserve in Harrison, Ohio, hosted a workers reunion event in the Visitors Center on Saturday, October 15, 2011. More than 300 former workers from the Production Era (1950 to 1989) and the Cleanup Era (1989 to 2006) mingled with each other and the current staff representing the site's legacy management mission (2006 to present day) during the day-long event. A presentation was given that recognized the efforts of all these former and current site workers. Jane Powell, Fernald Preserve Site Manager, welcomed everyone and expressed her gratitude for their commitment and success. Gene Branham, long- serving president of the Fernald Atomic Trades and Labor Council, spoke about the Production Era and gave numerous examples of the memorable work that the Cold War Warriors did

145

U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist  

Broader source: Energy.gov (indexed) [DOE]

ll-10 ll-10 U.S. Department of Energy Office of Legacy Management National Environmental Policy Act Environmental Checldist Project/Activity: Maintenance actions at the Monument Valley, AZ, Site A. Brief Project/Activity Description The U.S. Department of Energy (DOE) Office of Legaey Management needs to remove windblown sand that has built up along the Monument Valley, AZ, Site north fence line, repair eroded areas below the fence, and raise the height of the site perimeter fence to prevent domestic animal intrusion into the site area. The windblown sand has formed a small dune along the nOlth perimeter fence line of the site. The affected fence is 3 feet high and consists of three strands of barbed wire. Windblown weeds accumulate along the fence and trap sand, which over time buries the fence and enables free-

146

Contact: John Hampson ABIA Business Engagement Manager  

E-Print Network [OSTI]

to underpin growth amongst small-to-medium sized businesses (SMEs) operating in the science and technology and facilities of the University to support technology development, R&D, business development and growth

Birmingham, University of

147

Office of Environmental Management Taps Small Business for Waste Isolation  

Broader source: Energy.gov (indexed) [DOE]

Environmental Management Taps Small Business for Waste Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract August 29, 2012 - 4:54pm Addthis A stratigraph of the Waste Isolation Pilot Plant's underground layers, where Transuranic waste is safely stored. A stratigraph of the Waste Isolation Pilot Plant's underground layers, where Transuranic waste is safely stored. John Hale III John Hale III Director, Office of Small and Disadvantaged Business Utilization This week, Celeritex, LLC landed a contract worth up to $17.8 million with the Office of Environmental Management, having demonstrated through a competetive process that this small business is up to the task of securing and isolating defense-generated Transuranic waste.

148

DOE - Office of Legacy Management -- Palos Park Forest Preserve Site (A  

Office of Legacy Management (LM)

Palos Park Forest Preserve Site (A Palos Park Forest Preserve Site (A Plot M) - IL 04 FUSRAP Considered Sites Site: Palos Park Forest Preserve Site (A/Plot M) (IL.04 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Site A/Plot M, Illinois, Decommissioned Reactor Site Documents Related to Palos Park Forest Preserve Site (A/Plot M) Surveillance of Site A and Plot M Report for 2011. ANL-12/01 Surveillance of Site A and Plot M Report for 2007 Environment, Safety, and Health/Quality Assurance Oversight Division Surveillance of Site A and Plot M Report for 2009. ANL-10/01. April 2010 U.S. Department of Energy Office of Legacy Management Environmental

149

DOE - Office of Legacy Management -- Riverton Mill Site - WY 0-04  

Office of Legacy Management (LM)

Mill Site - WY 0-04 Mill Site - WY 0-04 FUSRAP Considered Sites Site: Riverton Mill Site (WY.0-04 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Riverton, Wyoming, Processing Site Documents Related to Riverton Mill Site Data Validation Package for the November 2008 Groundwater and Surface Water Sampling at the Riverton, Wyoming, Processing Site. February 2009 U. S. Department of Energy (DOE) Status and Planned Actions at the Riverton, Wyoming, Uranium Mill Tailing Radiation Control Act (UMTRCA) Title I Site April Gil, PhD Environment Team Lead Office of Legacy Management (LM) May 2, 20122 Status and Action Summary 􀂄 Surface

150

DOE - Office of Legacy Management -- Columbus East OH Site - OH 26  

Office of Legacy Management (LM)

Columbus East OH Site - OH 26 Columbus East OH Site - OH 26 FUSRAP Considered Sites Columbus East, OH Alternate Name(s): B&T Metals Site OH.26-1 Location: 425 West Town Street, Columbus, Ohio OH.26-3 Historical Operations: Performed extrusion and machining on natural uranium metal billets to support MED. OH.26-4 OH.26-7 Eligibility Determination: Eligible OH.26-1 OH.26-2 Radiological Survey(s): Assessment Survey, Verification Survey OH.26-5 OH.26-6 Site Status: Certified - Certification Basis, Federal Register Notice included OH.26-8 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP Also see Columbus East, OH, Site Documents Related to Columbus East, OH Columbus East Site Aerial Photograph FACT SHEET Office of Legacy Management Columbus East, Ohio, Site

151

U.S. Department of Energy Office of Legacy Management National Envkonmental Policy Act Environmental Checklist  

Broader source: Energy.gov (indexed) [DOE]

- - 19-10 U.S. Department of Energy Office of Legacy Management National Envkonmental Policy Act Environmental Checklist Project/Activity: Drill one exploratory hole on L.T. c-WM-17 by Golden Eagle Uranium A. Brief Project! Activity Descl'iptioll Golden Eagle Uranium (LLC) proposes to drill one 5-inch-diameter exploratory borehole on U.S. Department of Energy (DOE) lease tract C-WM-17, located in western Montrose County, Colorado. The drilling would be completed by a truck-mounted rotary drill rig capable of boring to 1,000 feet (ft) below ground surface (bgs). The proposed location of the drill hole is in a previously disturbed area and is adjacent to a two-track dirt road. Access to the site would be on existing dirt roads. The drilling would be completed dry to an estimated depth of 550 ft bgs. Once data are collected, the hole

152

DOE - Office of Legacy Management -- Slick Rock Mill Site - CO 08  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Slick Rock Mill Site - CO 08 Slick Rock Mill Site - CO 08 FUSRAP Considered Sites Site: Slick Rock Mill Site (CO.08) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Slick Rock, Colorado, Processing Site Documents Related to Slick Rock Mill Site 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Slick Rock, Colorado, Disposal Site. LMS/S09461. February 2013 Verification Monitoring Report for the Slick Rock, Colorado, Processing Sites, 2007 Update June 2008 Office of Legacy Management DOE M/1577 2008 - -L Work Performed Under DOE Contract No. for the U.S.

153

A Framework for Managing Concurrent Business and ICT Development  

Science Journals Connector (OSTI)

In this paper we propose a framework the FADE(E) for managing the concurrent development of the business and the ICT side of an enterprise. The framework is based on lessons learned from literature on Ente...

Frank G. Goethals; Jacques Vandenbulcke

2004-01-01T23:59:59.000Z

154

ORAU Wins DOE Facility Management Contractor Small Business Achievemen...  

Energy Savers [EERE]

On June 12, 2014, at the US Department of Energy's Small Business Forum in Tampa, FL, the Oak Ridge Associated Universities won the FY 2013 Facility Management Contractor Small...

155

Retreading Tire Management with Business Intelligence  

Science Journals Connector (OSTI)

Justifying the development of a business intelligence system is challenging when the primary beneficiaries of the system are internal to the company responsible for that development; it is even harder to justify when the system is designed to produce ... Keywords: Application Domain, Business Intelligence System, Disparate Systems, Radical New Service Products, Tire Company

Scott Collier, Dana Edberg, David Croasdell

2012-10-01T23:59:59.000Z

156

U.S. Department of Energy Office of Legacy Management's Tribal Interactions - 12513  

SciTech Connect (OSTI)

Effective government-to-government interactions with tribal nations and maintaining stakeholder relations with members of tribes are increasingly important to the U.S. Department of Energy (DOE) Office of Legacy Management (LM). As of October 2011, LM was responsible for long-term surveillance and maintenance of 87 sites and facilities in the continental U.S. and Puerto Rico, including some sites on tribal lands. The sites on tribal lands can affect natural resources that are managed or used by tribes, or the sites can potentially affect areas of cultural significance to tribal nations in Alaska, Arizona, Colorado, New Mexico, Utah, Washington, and Wyoming. Tribes are separate sovereign governments recognized in the U.S. Constitution and are significant stakeholders for LM sites. The tribes are individual nations with diverse histories, cultures, customs, religions, and laws. LM has regular communication with the affected tribes to inform members of issues, to allow the tribe to participate in decision making, to provide technical reviews, and to ensure tribal concerns are addressed. Four LM sites are in the Navajo Nation. Three of those sites contain uranium mill tailings disposal cells regulated under long-term surveillance and maintenance programs that require monitoring and annual inspections. The fourth site was remediated but still has a groundwater plume that LM is responsible for. DOE and LM have worked with the Navajo Nation for almost 30 years on technical issues and to ensure tribal concerns are addressed. (authors)

Gil, April; Shafer, David [U.S. Department of Energy Office of Legacy Management, Grand Junction, Colorado 81503 (United States); Elmer, John [S.M. Stoller Corporation, Grand Junction, Colorado 81503 (United States)

2012-07-01T23:59:59.000Z

157

Mixed-Initiative Management of Dynamic Business Processes  

E-Print Network [OSTI]

process- management approaches respond reactively to process dynamics, if they deal with them at allMixed-Initiative Management of Dynamic Business Processes Zachary B. Rubinstein Department of Computer Science University of New Hampshire Durham, NH 03824-3591 zack@cs.unh.edu Daniel D. Corkill

Corkill, Daniel

158

Project Management Business Process Project Delivery Processes Includes VE Budget  

E-Print Network [OSTI]

Project Management Business Process Project Delivery Processes Includes VE Budget Schedule Activities that do/could feed into PMBP LEGEND VE Cost Avoidance Program Coverage Document Results (Before, could use the value methodology to facilitate after action review. The project manager is responsible

US Army Corps of Engineers

159

Integrated Weed Control for Land Stewardship at Legacy Management's Rocky Flats Site in Colorado - 13086  

SciTech Connect (OSTI)

Land stewardship is one of nine sustainability programs in the U.S. Department of Energy's Environmental Management System. Land stewardship includes maintaining and improving ecosystem health. At the Rocky Flats Site near Westminster, Colorado, land stewardship is an integral component of the Office of Legacy Management's post-closure monitoring and management at the site. Nearly 263 hectares (650 acres) were disturbed and re-vegetated during site cleanup and closure operations. Proactive management of revegetation areas is critical to the successful reestablishment of native grasslands, wetlands, and riparian communities. The undisturbed native plant communities that occur at the site also require active management to maintain the high-quality wetlands and other habitats that are home to numerous species of birds and other wildlife such as elk and deer, rare plant communities, and the federally listed threatened Preble's meadow jumping mouse. Over the past several decades, an increase of Noxious weeds has impacted much of Colorado's Front Range. As a result, weed control is a key component of the land stewardship program at Rocky Flats. Thirty-three species of state-listed Noxious weeds are known to occur in the Central and Peripheral Operable Units at Rocky Flats, along with another five species that are considered invasive at the site. Early detection and rapid response to control new invasive species is crucial to the program. An integrated weed control/vegetation management approach is key to maintaining healthy, sustainable plant communities that are able to resist Noxious weed invasions. Weed mapping, field surveys, and field-staff training sessions (to learn how to identify new potential problem species) are conducted to help detect and prevent new weed problems. The integrated approach at Rocky Flats includes administrative and cultural techniques (prevention), mechanical controls, biological controls, and chemical controls. Several species of biocontrol insects have been released to assist with control of different target weed species. Monitoring is conducted to evaluate the effectiveness of control efforts and to provide information for future control efforts. The effective implementation of this integrated approach has reduced the infestation levels of many species and has kept several newly discovered invasive species from spreading and becoming larger problems at the site. (authors)

Nelson, Jody K. [Stoller LMS Team, Contractor to the U.S. Department of Energy Office of Legacy Management, 11025 Dover Street, Suite 1000, Westminster, Colorado 80021 (United States)] [Stoller LMS Team, Contractor to the U.S. Department of Energy Office of Legacy Management, 11025 Dover Street, Suite 1000, Westminster, Colorado 80021 (United States)

2013-07-01T23:59:59.000Z

160

Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317  

SciTech Connect (OSTI)

To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result of the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining whether a solar PV project is feasible on the new sites. (authors)

Elmer, John; Butherus, Michael [S.M. Stoller Corporation (United States)] [S.M. Stoller Corporation (United States); Barr, Deborah L. [U.S. Department of Energy Office of Legacy Management (United States)] [U.S. Department of Energy Office of Legacy Management (United States)

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

1. Advertisement Ref: 743 School of Business, Management and Economics  

E-Print Network [OSTI]

-Vice-Chancellors. The Registrar and Secretary heads the Professional Services of the University. In addition, under the University1 1. Advertisement Ref: 743 School of Business, Management and Economics SPRU � Science Policy of Innovation and Evolutionary Economics at SPRU (Science Policy Research Unit) at the University of Sussex

Sussex, University of

162

1. Advertisement Ref: 742 School of Business, Management and Economics  

E-Print Network [OSTI]

-Vice-Chancellors. The Registrar and Secretary heads the Professional Services of the University. In addition, under the University1 1. Advertisement Ref: 742 School of Business, Management and Economics SPRU � Science Policy of Sustainability Transitions at SPRU (Science Policy Research Unit) at the University of Sussex. Founded in 1966

Sussex, University of

163

Business-Driven Management of Hybrid IT Infrastructures  

E-Print Network [OSTI]

Business-Driven Management of Hybrid IT Infrastructures Paulo Ditarso Maciel Jr.a , Marcus in this hybrid infrastructure are characterised by a utility function: the utility yielded by the completion Grande - PB, Brasil b Automated Infrastructure Lab Hewlett-Packard Laboratories Bristol Long Down Avenue

Cirne, Walfredo

164

Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites  

SciTech Connect (OSTI)

This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associated analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.

None

2012-10-24T23:59:59.000Z

165

Business Process Management: A Comprehensive Survey  

E-Print Network [OSTI]

- cept of a process model is fundamental. Process models may be used to configure information systems productivity improvements, cost savings, and flow-time reductions. The practical relevance of BPM and rapid be seen as an extension of Workflow Management (WFM). WFM primar- ily focuses on the automation

Aalst, W.M.P.van der

166

Business Management and Planning (BMP) Division | U.S. DOE Office of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Business Management and Planning (BMP) Division Business Policy and Operations (BPO) BPO Home Leadership Organization Chart .pdf file (195KB) Business Management and Planning (BMP) Division SC Systems and Operations (SCSO) Division Contact Information Business Policy & Operations U.S. Department of Energy SC-45/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-0192 F: (301) 903-2481 More Information » Business Management and Planning (BMP) Division Print Text Size: A A A RSS Feeds FeedbackShare Page The Business Management and Planning (BMP) Division provides planning, design, implementation, and overall project management for SC mission-support IT Initiatives such as research grants and financial management systems; network modernization; and IT Strategic and Operational

167

ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year  

Broader source: Energy.gov [DOE]

The Oak Ridge Associated Universities (ORAU) won the Facility Management Contractor Small Business Achievement of the Year Award for FY 2013 at the Small Business Forum & Expo, June 12, 2014, Tampa, FL.

168

FOUNDATIONS: The Science Behind Leadership & Management Advancing the Business of Science  

E-Print Network [OSTI]

FOUNDATIONS: The Science Behind Leadership & Management Advancing the Business of Science, in order to shape a systematic approach to leadership and management this course you will: · Recognize leadership and management approaches that align

Sheridan, Jennifer

169

A Publication of the Rawls College of Business | Texas Tech University 2005 Distinguished Alumni  

E-Print Network [OSTI]

Corporate Governance & Ethics Center Health Organizational Management Center International Business Center Energy Commerce Program MD/MBA Program If you are interested in building legacies with the Rawls College of Business, please contact Wendell Jeffreys, Director of Development, at 806.742.3187 or w

Westfall, Peter H.

170

INDEPENDENT TECHNICAL EVALUATION AND RECOMMENDATIONS FOR CONTAMINATED GROUNDWATER AT THE DEPARTMENT OF ENERGY OFFICE OF LEGACY MANAGEMENT RIVERTON PROCESSING SITE  

SciTech Connect (OSTI)

The U.S. Department of Energy Office of Legacy Management (DOE-LM) manages the legacy contamination at the Riverton, WY, Processing Site a former uranium milling site that operated from 1958 to 1963. The tailings and associated materials were removed in 1988-1989 and contaminants are currently flushing from the groundwater. DOE-LM commissioned an independent technical team to assess the status of the contaminant flushing, identify any issues or opportunities for DOE-LM, and provide key recommendations. The team applied a range of technical frameworks spatial, temporal, hydrological and geochemical in performing the evaluation. In each topic area, an in depth evaluation was performed using DOE-LM site data (e.g., chemical measurements in groundwater, surface water and soil, water levels, and historical records) along with information collected during the December 2013 site visit (e.g., plant type survey, geomorphology, and minerals that were observed, collected and evaluated). A few of the key findings include: ? Physical removal of the tailings and associated materials reduced contaminant discharges to groundwater and reduced contaminant concentrations in the near-field plume. ? In the mid-field and far-field areas, residual contaminants are present in the vadose zone as a result of a variety of factors (e.g., evaporation/evapotranspiration from the capillary fringe and water table, higher water levels during tailings disposal, and geochemical processes). ? Vadose zone contaminants are widely distributed above the plume and are expected to be present as solid phase minerals that can serve as secondary sources to the underlying groundwater. The mineral sample collected at the site is consistent with thermodynamic predictions. ? Water table fluctuations, irrigation, infiltration and flooding will episodically solubilize some of the vadose zone secondary source materials and release contaminants to the groundwater for continued down gradient migration extending the overall timeframe for flushing. ? Vertical contaminant stratification in the vadose zone and surficial aquifer will vary from location to location. Soil and water sampling strategies and monitoring well construction details will influence characterization and monitoring data. ? Water flows from the Wind River, beneath the Riverton Processing Site and through the plume toward the Little Wind River. This base flow pattern is influenced by seasonal irrigation and other anthropogenic activities, and by natural perturbations (e.g., flooding). ? Erosion and reworking of the sediments adjacent to the Little Wind River results in high heterogeneity and complex flow and geochemistry. Water flowing into oxbow lakes (or through areas where oxbow lakes were present in the past) will be exposed to localized geochemical conditions that favor chemical reduction (i.e., naturally reduced zones) and other attenuation processes. This attenuation is not sufficient to fully stabilize the plume or to reduce contaminant concentrations in the groundwater to target levels. Consistent with these observations, the team recommended increased emphasis on collecting data in the zones where secondary source minerals are projected to accumulate (e.g., just above the water table) using low cost methods such as x-ray fluorescence. The team also suggested several low cost nontraditional sources of data that have the potential to provide supplemental data (e.g., multispectral satellite imagery) to inform and improve legacy management decisions. There are a range of strategies for management of the legacy contamination in the groundwater and vadose zone near the Riverton Processing Site. These range from the current strategy, natural flushing, to intrusive remedies such as plume scale excavation of the vadose zone and pump & treat. Each option relates to the site specific conditions, issues and opportunities in a unique way. Further, each option has advantages and disadvantages that need to be weighed. Scoping evaluation was performed for three major classes

Looney, B.; Denham, M.; Eddy-Dilek, C.

2014-05-06T23:59:59.000Z

171

Danny Lloyd Supply Purchasing Manager & Jlab Small Business Program Manager  

Broader source: Energy.gov (indexed) [DOE]

Danny Lloyd Danny Lloyd Supply Purchasing Manager & Jlab Small Business Program Manager JSA Mentor-Protégé Program Thomas Jefferson National Accelerator Facility Newport, News, Virginia Danny Lloyd Supply Purchasing Manager JLab Small Business Program Manager JSA Mentor-Protégé Program * Jefferson Lab is managed and operated by Jefferson Science Associates, LLC, a joint venture between Southeastern Universities Research Association, Inc., and Computer Sciences Corporation Applied Technologies, LLC, under a contract with the U.S. Department of Energy * 1987 Construction began on the Continuous Electron Beam Accelerator Facility (CEBAF) - 1995 Physics experiments started at CEBAF * Jefferson Lab is constructing a 12 GeV Upgrade, a $310 million project

172

Active Energy-Aware Management of Business-Process Based Applications  

E-Print Network [OSTI]

Active Energy-Aware Management of Business-Process Based Applications Position Paper Danilo Ardagna of advanced ac- tive energy-aware business process applications, based on expertise from several research for the development of green business process systems can only be achieved by recognizing their multi-layer feedback

Becker, Steffen

173

Small Business Program Management | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Small Business Program Management Small Business Program Management Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act Categorical Exclusion Determinations Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Larry Kelly U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-0885 Services Small Business Program Management Print Text Size: A A A RSS Feeds FeedbackShare Page Related Links Federal Acquisition Regulations External link DOE Small Business Program U.S. Small Business Administration External link Small Businesses are vital to our country's continued growth and it is important to the ISC that small business is provided the maximum practical

174

Student, Business & Professional Studies "The Strategic Leadership  

E-Print Network [OSTI]

Foundations of Business Process Management (BPM) 232 Organizational Aspects of Business Process Management (BPM) 232 Tools & Techniques of Business Process Management (BPM) 232 Business Strategy 232 Business

Toronto, University of

175

Empirical research in business process management: introduction to the special issue  

E-Print Network [OSTI]

of BPM lies in its promise to create sustainable high-performing processes that demonstrate strategicEDITORIAL Empirical research in business process management: introduction to the special issue Jan with an introduction to Business Process Management and the challenges of empirical research in this field. We

Wieringa, Roel

176

BPM-in-the-Large Towards a higher level of abstraction in Business Process Management  

E-Print Network [OSTI]

BPM-in-the-Large ­ Towards a higher level of abstraction in Business Process Management Constantin@idi.ntnu.no Abstract. Business Process Management (BPM) has gained tremendous importance in recent years and BPM that existing approaches have problems dealing with the enormous challenges real-life BPM projects are facing

Paris-Sud XI, Université de

177

Graduate School of Creative Science and Engineering Department of Business Design and Management  

E-Print Network [OSTI]

Graduate School of Creative Science and Engineering Department of Business Design and Management Summary of Research Instruction Graduate School of Creative Science and Engineering Department of Business Design and Management 2014/092015/04 1 #12; Graduate School of Creative Science and Engineering

Kaji, Hajime

178

TERRORISM'S LEGACY  

Science Journals Connector (OSTI)

TERRORISM'S LEGACY ... MORE THAN FOUR YEARS AFTER terrorists destroyed the World Trade Center (WTC), lower Manhattan residents like Craig Hall still don't know whether their homes harbor toxic dust from the twin towers' collapse. ... Many, though probably not all, of the homes in the area were carefully cleaned after the Sept. 11, 2001, terrorist attacks. ...

CHERYL HOGUE

2006-01-09T23:59:59.000Z

179

Fernald Preserve, Fernald, Ohio Comprehensive Legacy  

Office of Legacy Management (LM)

September 2013 September 2013 LMS/FER/S03496-7.0 Revision 7.0 Draft This page intentionally left blank LMS/FER/S03496-7.0 Comprehensive Legacy Management and Institutional Controls Plan Volumes I and II Fernald Preserve Fernald, Ohio September 2013 Revision 7 Draft This page intentionally left blank Volume I Legacy Management Plan January 2013September 2013 U.S. Department of Energy Revision 67 FinalDraft This page intentionally left blank Emergency Contact Legacy Management 24-hour Monitored Security Telephone Number (877) 695-5322 This page intentionally left blank U.S. Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. No. S03496-7.0-Draft Volume I-Legacy Management Plan

180

U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.).  

Broader source: Energy.gov (indexed) [DOE]

COALITION; COALITION; INFORMATION NETWORK FOR RESPONSIBLE MINING; CENTER FOR NATIVE ECOSYSTEMS; CENTER FOR BIOLOGICAL DIVERSITY; and SHEEP MOUNTAIN ALLIANCE, Plaintiffs, v. OFFICE OF LEGACY MANAGEMENT; and UNITED STATES DEPARTMENT OF ENERGY, Defendants. OPINION AND ORDER This matter is before the Court on Plaintiffs' appeal seeking judicial review of (1) Defendants' decision in 2007 to expand the Uranium Lease Management Program ("ULMP") in southwestern Colorado; (2) Defendants' issuance of leases to uranium mining companies under the ULMP; and (3) Defendants' approvals of exploration or reclamation activities on certain lease tracts. The matter has been fully briefed (ECF No. 78, 82, 88), and Defendants have submitted the administrative record to the Court

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Records Management | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Records Management Services » Records Management Records Management In 2009, Legacy Management constructed a state-of-the-art facility known as the LM Business Center in Morgantown, West Virginia. The facility houses historical records from the nation's former nuclear production sites and serves as an information technology data center. Learn about how LM is meeting its goal to "Preserve, Protect, and Share Information." The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has consolidated the business functions, including records management and records storage, information technology infrastructure, and other services at a new facility named the DOE LM Business Center (LMBC), located in Morgantown, West Virginia. The LMBC (formerly referred to as the LM Records Storage Facility), located

182

Internet-based supply chain management: using the Internet to revolutionize your business  

Science Journals Connector (OSTI)

The Internet has emerged in the recent past as a dynamic medium for channeling transactions between customers and firms in virtual marketplace. In particular, the World Wide Web has emerged as a powerful new channel for supply chain, rendering many intermediaries ... Keywords: Business-to-business, Internet, Supply chain, Supply chain management

Zillur Rahman

2003-12-01T23:59:59.000Z

183

Copyright 2009 IBM Global Business Services A Smarter Approach to Water Management  

E-Print Network [OSTI]

Copyright 2009 IBM Global Business Services 1 A Smarter Approach to Water Management Introduction In the early 21st century, there are 3 main global challenges related to the management of water resources' approach to water management is needed. Challenges facing the UK water industry In England and Wales

184

DOE - Office of Legacy Management -- Weldon Spring Chemical Co - MO 03  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Weldon Spring Chemical Co - MO 03 Weldon Spring Chemical Co - MO 03 FUSRAP Considered Sites Site: Weldon Spring Chemical Co. (MO.03) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Weldon Spring, Missouri, Site Documents Related to Weldon Spring Chemical Co. Summary of Work Session - Focus Area: Monitoring and Maintenance. Summary of Weldon Spring Long-Term Stewardship Plan Public Workshop. Summary of Work Session - Focus Area: Communication and Public Involvement. Land Use and Institutional Controls and Homeland SecurityFocus Area Work SessionWeldon Spring SiteInterpretive CenterDecember 5, 20022 Agenda7:00 p.m.Welcome, Pam Thompson, Manager, Weldon SpringObjective of

185

Review: Business Process Implementation for IT Professionals and Managers  

Science Journals Connector (OSTI)

......frameworks and component technologies. In this context, objects...relationship between processes, technology and practical implementation...missing is the role that technology could play in bringing about...or the business impact of intranets. In an otherwise good read......

Phil Davies

1999-11-01T23:59:59.000Z

186

Business-Driven Short-Term Management of a Hybrid IT Infrastructure1  

E-Print Network [OSTI]

Business-Driven Short-Term Management of a Hybrid IT Infrastructure1 Paulo Ditarso Maciel Jr Abstract We consider the problem of managing a hybrid computing infrastructure whose processing elements and associated quality of service guarantees. The applications that run in this hybrid infrastructure are char

Cirne, Walfredo

187

Office of Legacy Management  

Broader source: Energy.gov (indexed) [DOE]

JAN 3 1 2011 JAN 3 1 2011 MEMORANDUM FOR: SCOTT BLAKE H m S , DOE-GC-1 FROM: SUBJECT: Annual NEPA Planning Summary Attached is the Annual NEPA Planning Summary for LM. No Environmental Impact Statements (EISs) are planned or ongoing for the period of 201 1 to 2012, and LM is not a cooperating agency on other agencies' Environmental Assessments (EAs) or EISs. LM is, however, planning to complete two EAs in 201 1 that were begun in 2010. One EA (DOEIEA - 1747) considers impacts related to breaching five earthen darns on the Rocky Flats, CO, Site; it is expected to be completed in April 201 1. A second EA (DOEIEA - 1770) considers impacts related to leasing a portion of the Durango, CO, Disposal Site for construction, operation, and maintenance of a photovoltaic solar energy system. The EA is expected to be completed in February 201 1.

188

Managing the Nuclear Legacies  

Science Journals Connector (OSTI)

Perhaps the Yucca Mountain siting would have been more successful had...1997...) argued that DOE was being held hostage by local governments that depend upon DOE funds to support their economy. He called for...19...

Michael R. Greenberg

2013-01-01T23:59:59.000Z

189

Corporate Energy Management Strategies for GHG Reduction and Improved Business Performance  

E-Print Network [OSTI]

Corporate Energy Management Strategies for GHG Reduction & Improved Business Performance James E. Robinson, P.E., P.Eng., CEM, CEP Principal Project Engineer DES Global, LLC Greenville, South Carolina ABSTRACT Experience shows... level requires a lengthy project identi- fication, approval, implementation, and final per- formance evaluation cycle. Pending GHG regula- tions, energy cost, and business volatility have corpo- rations accelerating deployment this class of system...

Robinson, J. E.

190

Digitizing the Administrative Records of the U.S. Department of Energy Office of Environmental Management (Em) and Office of Legacy Management (LM) Ohio Sites  

SciTech Connect (OSTI)

As former weapons sites close and are transitioned to the U.S. Department of Energy (DOE) Office of Legacy Management (LM), continued public involvement is essential for the successful turnover of long-term surveillance and maintenance (LTS and M) activities. During the environmental remediation process, public participation was a key factor in cleanup completion. The same level of commitment to encourage active public participation is true for the LTS and M activities at the LM sites, such as the Miamisburg Closure Project and the Fernald Closure Project. Community members participate in the transition and the decision-making processes for LTS and M as they did for the selection of response actions under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup process. [1] A key part of the post-closure activities for the Ohio Sites transitioning to LM from the DOE Office of Environmental Management (EM) is the preservation of site history and stakeholder involvement in the LTS and M activities that will continue during post-closure. In meeting the regulatory requirements of providing the CERCLA Administrative Record Reading Room for public access and to ensure that appropriate records are retrievable and available for all stakeholders, a decision was made to digitize the Miamisburg Closure Project and the Fernald Closure Project Administrative Records. This decision was, in part, based on the information and lessons learned from the digitization of the Rocky Flats Environmental Technology Site (RFETS) CERCLA Administrative Records (AR). The Ohio Sites effort was expanded to include the Living History Project from the Fernald Closure Project. In most cases, the CERCLA AR maintained by EM closure sites and transitioned to LM will provide adequate baselines for identifying and capturing the information required by LM for post-closure stewardship of the sites. The AR established under Section 113(k) [2] of CERCLA serves two primary purposes. First, the record contains those documents that form the basis for selection of a response action and comply with Section 113(j) [3]; judicial review of any issue concerning the adequacy of any response action is limited to the record. Second, Section 113(k) [2] requires that the AR act as a vehicle for public participation in selecting a response action. The AR is the body of documents that 'forms the basis' for the selection of a particular response action at a site and contains historic information that has future study value by scholars, historians, regulators, and other stakeholders. (authors)

Powell, J. [U.S. Department of Energy Office of Legacy Management, Cincinnati, Ohio (United States); Williams, K.; Walpole, S. [S.M. Stoller Corporation, Miamisburg, Ohio (United States); McKinney, R. [Source One Management, Inc., Denver, Colorado (United States)

2007-07-01T23:59:59.000Z

191

U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.).  

Broader source: Energy.gov (indexed) [DOE]

COALITION, COALITION, INFORMATION NETWORK FOR RESPONSIBLE MINING, CENTER FOR NATIVE ECOSYSTEMS, CENTER FOR BIOLOGICAL DIVERSITY, and SHEEP MOUNTAIN ALLIANCE, Plaintiffs, v. OFFICE OF LEGACY MANAGEMENT, and UNITED STATES DEPARTMENT OF ENERGY, Defendants. ORDER GRANTING IN PART AND DENYING IN PART DEFENDANTS' MOTION FOR RECONSIDERATION This matter is before the Court on Defendants' Motion to Reopen and for Reconsideration of October 18, 2011 Order. (ECF No. 95.) Plaintiffs have filed a Response to the Motion (ECF No. 100), and Defendants have filed a Reply (ECF No. 101). The Court hereby REOPENS this action for the limited purpose of ruling on Defendants' Motion for Reconsideration. See D.C.COLO.LCivR 41.2. Having carefully considered the arguments presented, Defendants' Motion for Reconsideration is

192

Catchword: Business Process Management in the Large Dipl.-Wirt.-Inf. (DH) Constantin Houy M.A.  

E-Print Network [OSTI]

Management, BPM, BPM-in-the-Large, complexity 1. Increasing Complexity of Business Processes In recent years Business Process Management (BPM) attracted considerable attention, both in academia and practice. A growing research community is designing and investigating BPM approaches and techniques which

van der Aalst, Wil

193

The NASA Program Management Tool: A New Vision in Business Intelligence  

E-Print Network [OSTI]

1 The NASA Program Management Tool: A New Vision in Business Intelligence David G. Bell dbell@riacs.edu 650-604-0771 Peter Putz pputz@riacs.edu 650-604-2137 Universities Space Research Association NASA Ames Research Center Moffett Field, CA 94035 David A. Maluf david.a.maluf@nasa.gov 650-604-0611 Keith Swanson

Maluf, David A.

194

Business Process Management: A Survey W.M.P. van der Aalst1  

E-Print Network [OSTI]

mathias.weske@hpi.uni-potsdam.de Abstract. Business Process Management (BPM) includes methods, tech- proaches. Although the practical relevance of BPM is undisputed, a clear definition of BPM and related, and argue that BPM could benefit from for- mal methods/languages (cf. Petri nets, process algebras, etc

van der Aalst, Wil

195

ADMINISTRATIVE CHANGE TO NAP-25, Management and Operating Contractor Business Meals and Light Refreshment  

National Nuclear Security Administration (NNSA)

NAP-25 Admin Chg 1 1 NAP-25 Admin Chg 1 1 10-10-13 ADMINISTRATIVE CHANGE TO NAP-25, Management and Operating Contractor Business Meals and Light Refreshment Locations of Changes: Page Paragraph Changed To Every Header BOP-03.08 NAP-25 Cover Office of Acquisition &Supply Management Office of Acquisition & Project Management Cover Footer Office of Acquisition &Supply Management Office of Acquisition Management 1 1 Removed: FAR 31.205-14 and 1 1 Acquisition Letter 2005-12 Acquisition Letter 2012-05 1 3 Add: 3.a. NNSA Applicability 1 3a NNSA Service Center, NNSA Site Offices NNSA Federal personnel 1 3a And all NNSA Management and Operating (M&O) Contractors and to all NNSA Management and Operating (M&O) Contractors. Contracting Officers are responsible

196

China Business Development  

E-Print Network [OSTI]

China Business Development Postgraduate Programme #12;Programme: China Business Development with China: Intercultural Management 3 1 Daily life and business behaviour explained from a cultural perspective Chinese strategic thinking China's political constellation and its impact on business life Human

Einmahl, Uwe

197

An Effective Waste Management Process for Segregation and Disposal of Legacy Mixed Waste at Sandia National Laboratories/New Mexico  

SciTech Connect (OSTI)

Sandia National Laboratories/New Mexico (SNL/NM) is a research and development facility that generates many highly diverse, low-volume mixed waste streams. Under the Federal Facility Compliance Act, SNL/NM must treat its mixed waste in storage to meet the Land Disposal Restrictions treatment standards. Since 1989, approximately 70 cubic meters (2500 cubic feet) of heterogeneous, poorly characterized and inventoried mixed waste was placed in storage that could not be treated as specified in the SNL/NM Site Treatment Plan. A process was created to sort the legacy waste into sixteen well- defined, properly characterized, and precisely inventoried mixed waste streams (Treatability Groups) and two low-level waste streams ready for treatment or disposal. From June 1995 through September 1996, the entire volume of this stored mixed waste was sorted and inventoried through this process. This process was planned to meet the technical requirements of the sorting operation and to identify and address the hazards this operation presented. The operations were routinely adapted to safely and efficiently handle a variety of waste matrices, hazards, and radiological conditions. This flexibility was accomplished through administrative and physical controls integrated into the sorting operations. Many Department of Energy facilities are currently facing the prospect of sorting, characterizing, and treating a large inventory of mixed waste. The process described in this paper is a proven method for preparing a diverse, heterogeneous mixed waste volume into segregated, characterized, inventoried, and documented waste streams ready for treatment or disposal.

Hallman, Anne K. [Sandia National Labs., Albuquerque, NM (United States); Meyer, Dann [IT Corporation, Albuquerque, NM (United States); Rellergert, Carla A. [Roy F. Weston, Inc., Albuquerque, NM (United States); Schriner, Joseph A. [Automated Solutions of Albuquerque, Albuquerque, NM (United States)

1998-06-01T23:59:59.000Z

198

An effective waste management process for segregation and disposal of legacy mixed waste at Sandia National Laboratories/New Mexico  

SciTech Connect (OSTI)

Sandia National Laboratories/New Mexico (SNL/NM) is a research and development facility that generates many highly diverse, low-volume mixed waste streams. Under the Federal Facility Compliance Act, SNL/NM must treat its mixed waste in storage to meet the Land Disposal Restrictions treatment standards. Since 1989, approximately 70 cubic meters (2,500 cubic feet) of heterogeneous, poorly characterized and inventoried mixed waste was placed in storage that could not be treated as specified in the SNL/NM Site Treatment Plan. A process was created to sort the legacy waste into sixteen well-defined, properly characterized, and accurately inventoried mixed waste streams (Treatability Groups) and two low-level waste streams ready for treatment or disposal. From June 1995 through September 1996, the entire volume of this stored mixed waste was sorted and inventoried. This process was planned to meet the technical requirements of the sorting operation and to identify and address the hazards this operation presented. The operations were routinely adapted to safely and efficiently handle a variety of waste matrices, hazards, and radiological conditions. This flexibility was accomplished through administrative and physical controls integrated into the sorting operations. Many Department of Energy facilities are currently facing the prospect of sorting, characterizing, and treating a large inventory of mixed waste. The process described in this report is a proven method for preparing a diverse, heterogeneous mixed waste volume into segregated, characterized, inventoried, and documented waste streams ready for treatment or disposal.

Hallman, A.K. [Sandia National Labs., Albuquerque, NM (United States); Meyer, D. [IT Corp., Albuquerque, NM (United States); Rellergert, C.A. [Roy F. Weston, Inc., Albuquerque, NM (United States); Schriner, J.A. [Automated Solutions of Albuquerque, Inc., NM (United States)

1998-04-01T23:59:59.000Z

199

College of Business College of Business  

E-Print Network [OSTI]

and Innovation Management Organization and Innovation Management--Business Education Real Estate UNDERGRADUATE, finance, marketing, organization and innovation management, and real estate to undergraduates. The skills orientation, technology, business processes, and corporate social responsibility. Lower-division work provides

Stephens, Graeme L.

200

7th Int. Conference on Business Process Management (BPM`09) 7-10 September 2009, Ulm, Germany  

E-Print Network [OSTI]

7th Int. Conference on Business Process Management (BPM`09) 7-10 September 2009, Ulm, Germany www.bpm2009.org Keynote Speaker A.-W. Scheer BPM 3.0 Founder of IDS Scheer, President of Bitkom, Vice on Reference Modelling ER-BPM'09 - 1st International Workshop on Empirical Research in Business Process BPD'09

Pfeifer, Holger

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance  

SciTech Connect (OSTI)

This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

none,

2012-03-01T23:59:59.000Z

202

EFIT EMPLOYEES MANAGE GLOBALLY | MAXIMIZE CONTROL | DRIVE SAVINGS | BENEFIT EMPLOYEES| | MANAGE GLOBALLY | MAXIMIZE CONTROL | DRIVE SAVINGS | BENEFIT EMPLOYEES | MANAGE GLOBALLY | REAL BUSINESS. REAL SOLUTIONS.SM CORPORATE SERVICES  

E-Print Network [OSTI]

Referral Travel Assistance · Passport/Visa Information, Customs Information, Weather Reports, Emergency, at no additional charge, simply by calling a toll free number. The Global Assist Hotline program's coordination SOLUTIONS.SM CORPORATE SERVICES EXPENSE MANAGEMENT SOLUTIONS Global Assist® Hotline When business travel

Huang, Jianyu

203

LM Co-Hosts Internatonal Workshop on Uranium Legacy Sites | Department of  

Broader source: Energy.gov (indexed) [DOE]

Co-Hosts Internatonal Workshop on Uranium Legacy Sites Co-Hosts Internatonal Workshop on Uranium Legacy Sites LM Co-Hosts Internatonal Workshop on Uranium Legacy Sites October 16, 2012 - 1:51pm Addthis LM Co-Hosts Internatonal Workshop on Uranium Legacy Sites LM Co-Hosts Internatonal Workshop on Uranium Legacy Sites LM Co-Hosts Internatonal Workshop on Uranium Legacy Sites LM Co-Hosts Internatonal Workshop on Uranium Legacy Sites What does this project do? Goal 1. Protect human health and the environment The U.S. Department of Energy (DOE) Office of Legacy Management (LM) co-hosted, with the International Atomic Energy Agency (IAEA), a week of visits to DOE sites in Colorado and Utah, and a 4-day workshop in Grand Junction, Colorado. More than 30 visitors from 20 countries attended the event in August 2012. The IAEA International Workshop on Management and

204

Online Project Management Certification Syllabus Project management has evolved into a business practice that is closely aligned with the organizational and strategic goals of today's  

E-Print Network [OSTI]

1 Online Project Management Certification Syllabus Overview Project management has evolved. No matter what product or service a business offers, it has projects that must be delivered on time, on budget within scope and with much greater predictability. Project management provides established

Reisslein, Martin

205

UBC Social Ecological Economic Development Studies (SEEDS) Student Report Centre for Sustainable Information Management: A Business Plan  

E-Print Network [OSTI]

/documents management. #12;The Centre for Sustainable Information Management (CSIM): A Business Plan iii The design of the CSIM building will be Gold Leadership in Energy and Environmental Design (LEED) certified. The facilityUBC Social Ecological Economic Development Studies (SEEDS) Student Report Centre for Sustainable

206

Sustainable management in long-lived family businesses a resource-based analysis of Northern German builder's providers  

Science Journals Connector (OSTI)

Since the UNCED (United Nations Conference on Environment and Development) in Rio de Janeiro in 1992, sustainable development is a socio-political goal all over the world and it becomes even more relevant with regard to the recent discussion on climate change and the financial crisis. According to family business research, sustainability here defined as social, economic and ecologic long-term orientation seems to overlap partly with the resources of long-lived family businesses. This case study research concentrates on the sustainable management of family owned builder's providers which are at least in the fourth generation. The resource-based analysis shows how these long-lived family businesses use their sustainable resources and capabilities to stay competitive. As a result, the sustainable management concept for family businesses will be presented.

Britta Boyd

2010-01-01T23:59:59.000Z

207

Comparison of human resource management practices and perceptions of agri-business employees across three indonesian subcultures  

E-Print Network [OSTI]

was then administered to personnel of 8 agri-businesses of similar size located in three geographical regions of Indonesian including West Java, Bali, and Northern Sulawesi. These regions represent the central locales of three of Indonesia?s prominent.... Delimitations This study was designed to measure agri-business employees? perceptions of human resource management practices in three Indonesian regions- Western Java, Bali, and Northern Sulawesi. The data collected in this study may not be generalizable...

Kelly, Mark Christopher

2009-05-15T23:59:59.000Z

208

Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War  

Broader source: Energy.gov [DOE]

This Report to Congress was prepared pursuant to section 3130 of the National Defense Authorization Act (NDAA) for Fiscal Year (FY) 2008, and summarized the EM program and initiatives to accelerate the reduction of environmental risks and challenges posed by the legacy of the Cold War.

209

Legacy: Order (2015-CE-14025)  

Broader source: Energy.gov [DOE]

DOE ordered The Legacy Companies to pay a $8,000 civil penalty after finding Legacy had failed to certify that refrigerator Maxx-Ice brand basic model MCR3U complies with the applicable energy conservation standards.

210

Application Hosting and Management for Effectively Manage Online Content and Make Timely Business Decisions  

E-Print Network [OSTI]

· Monitoring and management of IBM WebSphere Portal software and underlying components · Help Desk to Help Desk portal framework and tool set that eases and speeds the delivery of high-value portal sites. Do you need your system in superior condition. With our help, you can get excellent value from your solution

Greenberg, Albert

211

The outlook for Operations Research: will business education supply enough management science new entrants to meet forecast demand  

Science Journals Connector (OSTI)

Can Management Science in Business Education become sufficiently popular to fill forecast demands for new entrants to its Operations Research (OR) subset? Based upon papers by numerous authors, this paper identifies an interesting phenomenon ?? an increasingly applicable field of Management Science plagued by students avoiding entry. This paper discusses the results of an examination of this phenomenon's background, provides data collected concerning current supply of and projected demand for new entrants in a subset of Management Science; examines the continuing call for new approaches to teaching Management Science as a means of attracting new entrants; and presents continued research suggestions.

Richard A. McMahon; Peter D. DeVries

2012-01-01T23:59:59.000Z

212

7th Int. Conference on Business Process Management (BPM`09) 7-10 September 2009, Ulm, Germany  

E-Print Network [OSTI]

7th Int. Conference on Business Process Management (BPM`09) 7-10 September 2009, Ulm, Germany www.bpm2009.org #12;General Information BPM`09 is the seventh international conference in a series and tracks for workshops, tutorials, panels and demos. The BPM`09 has the EMISA`09 as co-located conference

Ulm, Universität

213

DOE - Office of Legacy Management  

Office of Legacy Management (LM)

Weldon Spring Site Five-Year Review Survey Weldon Spring Site Five-Year Review Survey Community involvement is considered an integral part of the Weldon Spring Site and the five-year review process. Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), requires that remedial actions which result in any hazardous substances, pollutants, or contaminants remaining at the site be subject to a five-year review. The U.S. Department of Energy (DOE) is currently conducting the fourth five-year review at the Weldon Spring Site. The purpose of a five-year review is to ensure that the remedy that was implemented to clean up the site continues to protect human health and the environment.

214

DOE - Office of Legacy Management  

Office of Legacy Management (LM)

Mound Site Five-Year Review Survey Mound Site Five-Year Review Survey Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), requires that remedial actions which result in any hazardous substances, pollutants, or contaminants remaining at the site be subject to a five-year review. The U.S. Department of Energy (DOE) is currently conducting the third five-year review at the Mound, Ohio, Site. The purpose of a five-year review is to ensure that the remedies that were implemented at the site continue to protect human health and the environment. Community involvement is an integral part of the Mound Site and the CERCLA five-year review process. DOE invites your input or comments about the

215

Stoller Legacy Management Support VPP  

Office of Environmental Management (EM)

and procedures, work authorization requirements, and strongly believed in conduct of operations to ensure the safety of themselves, the public, and the environment. Because...

216

Towards Green BPM Sustainability and Resource Efficiency through Business Process Management  

Science Journals Connector (OSTI)

The sustainability of organizations business activities is gaining increasing importance. Taking the ... in the debate on global warming is the energy efficiency of information technology (IT) infrastructures. A...

Constantin Houy; Markus Reiter; Peter Fettke

2011-01-01T23:59:59.000Z

217

Energy-Smart Building Choices: How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money (Revision)  

SciTech Connect (OSTI)

Operating a typical school today is no easy task for facilities managers and business officials. You're expected to deliver increased services with constrained operating budgets. Many schools stay open for longer hours to accommodate community use of the facilities. Dilapidated buildings and systems gobble up energy, yet in many districts, maintenance needs are overshadowed by the need for expansion or new construction to serve growing student populations and changing educational needs.

Not Available

2002-02-01T23:59:59.000Z

218

Energy-Smart Building Choices: How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money  

SciTech Connect (OSTI)

Most K-12 schools could save 25% of their energy costs by being smart about energy. Nationwide, the savings potential is $6 billion. While improving energy use in buildings and busses, schools are likely to create better places for teaching and learning, with better lighting, temperature control, acoustics, and air quality. This brochure, targeted to school facilities managers and business officials, describes how schools can become more energy efficient.

Energy Smart Schools Team

2001-08-06T23:59:59.000Z

219

Recommendation 215: Recommendation on Remaining Legacy Materials...  

Office of Environmental Management (EM)

5: Recommendation on Remaining Legacy Materials on the Oak Ridge Reservation Recommendation 215: Recommendation on Remaining Legacy Materials on the Oak Ridge Reservation The board...

220

MRI Beginnings - a Legacy | GE Global Research  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Legacy From Nobel Ideas to Industrial Success - Bill Edelstein's Legacy Scott Smith 2014.06.13 Edelsteinwith-MRmachine Nuclear magnetic resonance (NMR) was discovered in...

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Business Acumen | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Analysis for Credit Decisions 0.20 Business Law Basic Concepts 1.00 Business Law and Ethics 1.00 Business Law and the Manager's Responsibilities 1.00 Organizational Budgeting...

222

Business-driven short-term management of a hybrid IT infrastructure  

Science Journals Connector (OSTI)

We consider the problem of managing a hybrid computing infrastructure whose processing elements are comprised of in-house dedicated machines, virtual machines acquired on-demand from a cloud computing provider through short-term reservation contracts, and virtual machines made available by the remote peers of a best-effort peer-to-peer (P2P) grid. Each of these resources has different cost basis and associated quality of service guarantees. The applications that run in this hybrid infrastructure are characterized by a utility function: the utility gained with the completion of an application depends on the time taken to execute it. We take a business-driven approach to manage this infrastructure, aiming at maximizing the profit yielded, that is, the utility produced as a result of the applications that are run minus the cost of the computing resources that are used to run them. We propose a heuristic to be used by a contract planner agent that establishes the contracts with the cloud computing provider to balance the cost of running an application and the utility that is obtained with its execution, with the goal of producing a high overall profit. Our analytical results show that the simple heuristic proposed achieves very high relative efficiency in the use of the hybrid infrastructure. We also demonstrate that the ability to estimate the grid behaviour is an important condition for making contracts that allow such relative efficiency values to be achieved. On the other hand, our simulation results with realistic error predictions show only a modest improvement in the profit achieved by the simple heuristic proposed, when compared to a heuristic that does not consider the grid when planning contracts, but uses it, and another that is completely oblivious to the existence of the grid. This calls for the development of more accurate predictors for the availability of P2P grids, and more elaborated heuristics that can better deal with the several sources of non-determinism present in this hybrid infrastructure.

Paulo Ditarso Maciel Jr.; Francisco Brasileiro; Ricardo Arajo Santos; David Candeia; Raquel Lopes; Marcus Carvalho; Renato Miceli; Nazareno Andrade; Miranda Mowbray

2012-01-01T23:59:59.000Z

223

IT Capital Planning Corporate Management Improvement Program (CMIP) |  

Broader source: Energy.gov (indexed) [DOE]

IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) IT Capital Planning Corporate Management Improvement Program (CMIP) The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the end of their life cycles. An investment to replace and modernize severely outdated information technology (IT) systems would prove a much more efficient expenditure of scarce IT dollars than the continued enhancement, maintenance, and operation of legacy systems. CMIP is an initiative to modernize and improve software applications, hardware, and infrastructure which support a wide range of Department-wide IT based business systems. CMIP permits the

224

Agility and Risk Management at Pacific Life: Optimizing Business Unit Autonomy  

E-Print Network [OSTI]

Pacific Life is a diversified financial services company with a history of autonomous business units. Pacific Life had five independent divisions, including Life Insurance, Annuities and Mutual Funds, and Investments. These ...

Ross, Jeanne W.

2007-12-01T23:59:59.000Z

225

Systems Thinking: Managing Chaos and Complexity: A Platform for Designing Business Architecture, 3 edition  

Science Journals Connector (OSTI)

In a global market economy, a viable business cannot be locked into a single form or function anymore. Rather, success is contingent upon a self-renewing capacity to spontaneously create structures, functions, and processes responsive to a fluctuating ...

Jamshid Gharajedaghi

2011-08-01T23:59:59.000Z

226

Legacy Risk Measure for Environmental Waste  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) is investigating the development of a comprehensive and quantitative risk model framework for environmental management activities at the site. Included are waste management programs (high-level waste, transuranic waste, low-level waste, mixed low-level waste, spent nuclear fuel, and special nuclear materials), major environmental restoration efforts, major decontamination and decommissioning projects, and planned long-term stewardship activities. Two basic types of risk estimates are included: risks from environmental management activities, and long-term legacy risks from wastes/materials. Both types of risks are estimated using the Environment, Safety, and Health Risk Assessment Program (ESHRAP) developed at the INEEL. Given these two types of risk calculations, the following evaluations can be performed: risk evaluation of an entire program (covering waste/material as it now exists through disposal or other e nd states); risk comparisons of alternative programs or activities; comparisons of risk benefit versus risk cost for activities or entire programs; ranking of programs or activities by risk; ranking of wastes/materials by risk; evaluation of site risk changes with time as activities progress; and integrated performance measurement using indicators such as injury/death and exposure rates. This paper discusses the definition and calculation of legacy risk measures and associated issues. The legacy risk measure is needed to support three of the seven types of evaluations listed above: comparisons of risk benefit versus risk cost, ranking of wastes/materials by risk, and evaluation of site risk changes with time.

Eide, S. A.; Nitschke, R. L.

2002-02-26T23:59:59.000Z

227

The marketing programme includes an all-important introduction to man-agement decision-making, as well as a set of business functions. Market-  

E-Print Network [OSTI]

The marketing programme includes an all-important introduction to man- agement decision-making, as well as a set of business functions. Market- ing is indispensable in top management's choice of markets to each of the following marketing policy areas: innovation and channel management, product/market

228

Meet with Large Businesses  

Broader source: Energy.gov (indexed) [DOE]

Meet with Large Businesses Meet with Large Businesses and learn about upcoming acquisitions! * Federal Energy Management Program (FEMP) * National Renewable Energy Laboratory (NREL) * Small Business Administration (SBA) * U.S. Department of Energy / Energy, Efficiency, and Renewable Energy (EERE) * U.S. Department of Energy / Golden Field Office (GFO) * Western Area Power Administration (WAPA) * Colorado Procurement Technical Assistance Center (PTAC)

229

Microsoft Word - 11-0632 Better Business Forms Data Report.doc  

Office of Legacy Management (LM)

Control Number 11-0632 May 13, 2011 U.S. Department of Energy Office of Legacy Management ATTN: Scott Surovchak Pinellas Site Manager 11025 Dover Street, Suite 1000 Westminster, CO 80021 SUBJECT: Contract No. DE-AM01-07LM00060, S.M. Stoller Corporation (Stoller) Better Business Forms Data Report REFERENCE: Task Order LM00-502-06-509, Pinellas, FL, Site Dear Mr. Surovchak: This letter reports the results of the final off-site plume delineation event on property owned by Better Business Forms at 10950 Belcher Road in April 2011. The purpose of this sampling event was to complete delineation of the contaminant plume that extends from the Building 100 Area on the Young - Rainey STAR Center south across Bryan Dairy Road onto private property. The

230

Spreading The Word: Capital Market Consequences of Business Press Coverage of Management Earnings Guidance  

E-Print Network [OSTI]

1 I. INTRODUCTION Management earnings guidance is a primary means by which the market adjusts its expectations of firms? earnings performance (Penman 1980; Cotter et al. 2006; Beyer et al. 2010).1 One of the main reasons managers choose... provides 59 percent of all accounting-based information used by the market, while Cotter et al. (2006) report that 47 percent of analysts revise their forecasts within five days after guidance. Note that I use the terms ?management earnings guidance...

Twedt, Brady J

2013-06-21T23:59:59.000Z

231

Three Essays in Business Management, the Natural Environment, and Environmental Policy  

E-Print Network [OSTI]

industry. Academy of Management Journal, 43: 351-371. HSBC.2007. HSBC launches climate change benchmark index.practices. For example, the HSBC Global Climate Change

Nairn-Birch, Nicholas Simon

2012-01-01T23:59:59.000Z

232

High-Tech Means High-Efficiency: The Business Case for EnergyManagement in High-Tech Industries  

SciTech Connect (OSTI)

In the race to apply new technologies in ''high-tech'' facilities such as data centers, laboratories, and clean rooms, much emphasis has been placed on improving service, building capacity, and increasing speed. These facilities are socially and economically important, as part of the critical infrastructure for pharmaceuticals,electronics, communications, and many other sectors. With a singular focus on throughput, some important design issues can be overlooked, such as the energy efficiency of individual equipment (e.g., lasers, routers and switches) as well as the integration of high-tech equipment into the power distribution system and the building envelope. Among technology-based businesses, improving energy efficiency presents an often untapped opportunity to increase profits, enhance process control,maximize asset value, improve the work place environment, and manage a variety of business risks. Oddly enough, the adoption of energy efficiency improvements in this sector lags behind many others. As a result, millions of dollars are left on the table with each year ofoperation.

Shanshoian, Gary; Blazek, Michele; Naughton, Phil; Seese, RobertS.; Mills, Evan; Tschudi, William

2005-11-15T23:59:59.000Z

233

The Business Values of Patient Knowledge Management PKM in the Healthcare Industry  

Science Journals Connector (OSTI)

Today, healthcare has become a progressive industry with novel techniques, approaches and findings in this field quickly being evaluated and improved. One of these approaches is patient-centered care PCC, which is defined essentially as an approach that ... Keywords: Customer Knowledge Management, Healthcare, Opportunity Costs, Patient Knowledge Management PKM, Patient-Centered Care PCC, Treatment Costs

Mohammad Soltani Delgosha; Ali Amoei Ojaki; Hamidreza Farhadi

2013-04-01T23:59:59.000Z

234

Business Opportunity Session Materials | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Materials Materials Business Opportunity Session Materials Presentations from our Washington DC Business Opportunity Session, held March 3, 2011 How to do Business with DOE Nickolas (Nick) Demer Senior Procurement Analyst OSDBU NNSA Opportunities Gary Lyttek Small Business Program Manager, NNSA Sandia National Laboratories Opportunities Don Devoti, Small Business Program Manager, Sandia National Laboratories Office of Science SBIR/STTR, Chris O'Gwin, Program Analyst, SBIR/STTR Program Office/Office of Science Opportunities with DOE Laboratories, Larry Thompson, Small Business Program Manager/Contract Specialist, Chicago Operations Office (Office of Science) Opportunities with the Office of Environmental Management, Kay Rash, Small Business Program Manager, Office of Environmental

235

DOE to Address Small Businesses Barriers in Government Contracting...  

Broader source: Energy.gov (indexed) [DOE]

to Address Small Businesses Barriers in Government Contracting at Waste Management Conference DOE to Address Small Businesses Barriers in Government Contracting at Waste Management...

236

15.568B Management Information Systems: Generating Business Value from Information Technology, Spring 2003  

E-Print Network [OSTI]

Concepts, frameworks, tools, techniques, and processes that assist management in its interaction with and direction of computer-based information systems today. Discusses the impact of the Internet, changes in the IT ...

Weill, Peter

237

Energy Management: A Corporate Objective in the Five-Year Business Plan  

E-Print Network [OSTI]

This paper presents the Energy Management Program developed by the Western Electric Company. The program includes managerial accountabilities; administrative and technical activities; and a most recently implemented comprehensive five-year energy...

Mulhern, T. A.

1982-01-01T23:59:59.000Z

238

Developing a More Effective Creative Operations Management System for Creative Businesses  

E-Print Network [OSTI]

too expensive and complicated for most users. They require the purchase of additional hardware or software, or are delivered via a subscription service (and if the subscription is terminated, all data is lost). According to interviews with actual... Manager is a relational database that costs $1,845.00 up front, and requires the purchase of multiple licenses of another software applica- tion (FileMaker Pro) in order to use it. Online project management systems are less expensive, but require...

Hembree, Ryan Matthew

2011-12-31T23:59:59.000Z

239

RAMON (RAY) M. HENSON, Ph.D. OFFICE Management and Global Business  

E-Print Network [OSTI]

and Organizational Psychology University of Michigan, Ann Arbor, Michigan Dissertation: Effects of Instructions for Organizational Design, Denver, CO Member of consulting firm providing organizational and HR consulting services efficiency and effectiveness. Built and implemented change management strategy; member of core team

Lin, Xiaodong

240

DAMAS: an Integrated Business Modelling Information System to Support Management Enterprise Decisions  

E-Print Network [OSTI]

in the wine production industry, especially because of the increase of high-quality producers: traditional management techniques. However, increasing efficiency in the wine industry is not easy, because of the relative complexity of wine industry processes. For example: · Vintages vary in quality and quantity; crop

Lavazza, Luigi

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Business Operations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Business Operations Business Operations Business Operations The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) business products, processes, and systems. The three main offices of Business Operations - Office of Budget, Office of Business Services, and Office of Information and Business Management - and their managers are outlined in the Business Operations organization chart. Offices Image of the Department of Energy Forrestal building in DC. Office of Budget The Office of Budget provides information that informs policy development and program planning, including basic market and economic data relevant to EERE's programs, market and economic analysis, estimation of the public benefits of EERE's programs, evaluation of past program performance and

242

What makes end-user training successful? A mixed method study of a business process management system implementation  

Science Journals Connector (OSTI)

Under what conditions is end-user training (EUT) as part of the implementation of a business process management (BPM) system successful? This question is addressed in this paper. Based on the literature on EUT and implementation success, we first argue that user involvement with, and attitude towards, a BPM system, both have a conditional effect on the relationship between EUT and the implementation success of the system. Secondly, we investigated this expectation empirically, by measuring the practice of EUT as perceived by end-users. Using a mixed method approach, survey data was collected from 143 end-users of a BPM system in a large Dutch social insurance organisation, and by 49 additional semi-structured interviews. Regression analysis of the survey data shows that attitude variables indeed have a significant moderating influence on implementation success. In addition, the interviews revealed that specific attention must be paid to the arrangements for EUT when deploying BPM systems in this type of organisations. Arguments are given for a more comprehensive way of measuring and optimising EUT during the implementation of information systems/information technology in organisations.

Benny M.E. De Waal; Ronald Batenburg

2012-01-01T23:59:59.000Z

243

Effects of Intermediate Ethanol Blends on Legacy Vehicles and...  

Office of Environmental Management (EM)

Effects of Intermediate Ethanol Blends on Legacy Vehicles and Small Non-Road Engines, Report 1 Updated Feb 2009 Effects of Intermediate Ethanol Blends on Legacy Vehicles and...

244

DOE - Office of Legacy Management -- Canon  

Office of Legacy Management (LM)

Pennsylvania Pennsylvania Canonsburg, Pennsylvania, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Canonsburg, Pennsylvania, Disposal Site Data Validation Package-October 2011 Groundwater and Surface Water Sampling Ground Water Compliance Action Plan and Application for Alternate Concentration Limit Application (ACL) for the Canonsburg, Pennsylvania, UMTRA Project Site Long-Term Surveillance Plan for the U.S. Department of Energy Canonsburg Uranium Mill Tailings Disposal Site Canonsburg, Pennsylvania Please be green. Do not print these documents unless absolutely necessary.

245

DOE - Office of Legacy Management -- Rulison  

Office of Legacy Management (LM)

Rulison, Colorado, Site Rulison, Colorado, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Data Validation Package-May 2012 Groundwater and Surface Water Sampling Deed Restriction Final Rulison Path Forward Long-Term Hydrologic Monitoring Program Sampling and Analysis Results for 2012 Monitoring Plan Internal Links Tritium Transport Model Natural Gas Well Monitoring Results External Links Office of Scientific & Technical Information (OSTI) OSTI Energy Citations Database OSTI Information Bridge Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon

246

DOE - Office of Legacy Management -- Rulison Monitoring  

Office of Legacy Management (LM)

Rulison Monitoring Rulison Monitoring Rulison, Colorado, Site Natural Gas Well Monitoring Results Monitoring Results for Natural Gas Wells Near Project Rulison Third Quarter 2013 Monitoring Results for Natural Gas Wells Near Project Rulison Second Quarter 2013 Monitoring Results Natural Gas Wells Near Project Rulison Fourth Quarter 2012 and First Quarter 2013 Monitoring Results Natural Gas Wells Near Project Rulison Third Quarter 2012. Monitoring Results for Natural Gas Wells Near Project Rulison (2nd quarter 2012) Monitoring Results for Natural Gas Wells Near Project Rulison (1st quarter 2012) Monitoring Results Natural Gas Wells Near Project Rulison (4th quarter 2011) Project Rulison Monitoring Results for Water Vapor in Gas at the Holmes Mesa Compressor Station, Garfield County, Colorado (3rd quarter

247

DOE - Office of Legacy Management -- Chariot  

Office of Legacy Management (LM)

Alaska Alaska Chariot, Alaska, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. . Status of Pending Decision Documents Project Chariot Site Assessment and Remedial Action Final Report Under development All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Assessment and Remedial Action Reports Finding of No Significant Impact Geologic Investigations Other Documents Fact Sheet Chariot, Alaska, Site Fact Sheet January 16, 2013 Assessment and Remedial Action Reports Project Chariot Site Assessment and Remedial Action Final Report August 1994

248

DOE - Office of Legacy Management -- Piqua  

Office of Legacy Management (LM)

Ohio Ohio Piqua, Ohio, Decommissioned Reactor Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2013 Annual Inspection and Radiological Survey Results for the Piqua, Ohio, Decommissioned Reactor Site Long-Term Surveillance Plan for the Piqua Nuclear Power Facility, Piqua, Ohio Postclosure Agreement Between City of Piqua, Ohio, and U.S. Atomic Energy Commission, 1968 Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection and Radiological Survey Reports Long-Term Surveillance Plan Other Documents

249

DOE - Office of Legacy Management -- Falls  

Office of Legacy Management (LM)

Texas Texas Falls City, Texas, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Falls City, Texas, Disposal Site Data Validation Package-April 2013 Groundwater Sampling Ground Water Compliance Action Plan Long-Term Surveillance Plan for the U.S. Department of Energy Falls City Uranium Mill Tailings Disposal Site Falls City, Texas Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon

250

DOE - Office of Legacy Management -- Oxnard  

Office of Legacy Management (LM)

California California Oxnard, California, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Other Documents Fact Sheet Oxnard, California, Site Fact Sheet December 15, 2011 Other Documents Summary Environmental Site Assessment Report for the U.S. Department of Energy, Oxnard Facility, Oxnard, California February 1996 Historical documents may contain links to outside sources. LM cannot attest to the accuracy of information provided by these links.

251

DOE - Office of Legacy Management -- Edge  

Office of Legacy Management (LM)

South Dakota South Dakota Edgemont, South Dakota, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites-Edgemont, South Dakota, Disposal Site Long-Term Surveillance Plan for the DOE Tennessee Valley Authority (UMTRCA Title II) Disposal Site, Edgemont, South Dakota Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report Long-Term Surveillance Plan Fact Sheet Edgemont, South Dakota, Disposal Site Fact Sheet December 15, 2011

252

DOE - Office of Legacy Management -- Weldon  

Office of Legacy Management (LM)

Missouri Missouri Weldon Spring, Missouri, Site Key Documents and Links Site History pdf_icon Long-Term Surveillance and Maintenance Plan - December 2008 pdf_icon Annual Inspection Report pdf_icon Fourth Five-Year Review pdf_icon Federal Facility Agreement pdf_icon EPA Response to Comments and FFA Finalization pdf_icon Explanation of Significant Differences pdf_icon Baseline Concentrations of the Chemical Plant Operable Unit Monitored Natural Attenuation Network pdf_icon Weldon Spring Site Annual Report for Calendar Year 2012 pdf_icon FACT SHEETS Please be green - do not print these documents unless absolutely necessary Request a paper copy of any document by submitting a Document Request This Site All Sites All LM Quick Search All Site Documents All documents are Adobe Acrobat files. pdf_icon

253

DOE - Office of Legacy Management -- Bonus  

Office of Legacy Management (LM)

Puerto Rico Puerto Rico Boiling Nuclear Superheater (BONUS), Puerto Rico, Decommissioned Reactor Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet BONUS, Puerto Rico, Reactor Clausurado, Hoja de Datos Long-Term Surveillance and Maintenance Plan Plan para la vigilance y mantenimiento a largo plaza Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Reports Other Documents Español Documents Fact Sheet Boiling Nuclear Superheater, Puerto Rico, Site Fact Sheet August 2012 Reports PREPA-DOE Letter of Agreement July 2010

254

DOE - Office of Legacy Management -- Spook  

Office of Legacy Management (LM)

Spook, Wyoming, Disposal Site Spook, Wyoming, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Spook, Wyoming, Disposal Site Ground Water Compliance Action Plan Final Long-Term Surveillance Plan for the Spook, Wyoming, Disposal Site Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Reports Environmental Assessment Groundwater Compliance Action Plan Long-Term Surveillance Plan

255

DOE - Office of Legacy Management -- Fernald Benefits  

Office of Legacy Management (LM)

Ohio > Fernald Benefits Ohio > Fernald Benefits Fernald Preserve, Ohio Former Fernald Workers' Employment Verification and Benefits Information Employment Verification Fernald employment verification requests will only be accepted in writing and require the signature of the former employee authorizing the release of the requested information. Please direct your requests to Fluor Government Group, Employment Verification, P.O. Box 1050, Richland, WA 99352, fax (509) 376-7018. Worker and Community Transition Program (Section 3161) All education, training, preference in hiring, relocation, and outplacement inquiries should be directed to Professional Services of America, Inc., 601 Avery Street, Suite 500, Parkersburg, WV 26101, (866) 562-7482, ext. 1028, e-mail: bgraham@psa-inc.com.

256

DOE - Office of Legacy Management -- Maybell  

Office of Legacy Management (LM)

Maybell, Colorado, Disposal Site Maybell, Colorado, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Maybell, Colorado, Disposal Site Long-Term Surveillance Plan for the Maybell, Colorado (UMTRCA Title I) Disposal Site Moffat County, Colorado Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report Long-Term Surveillance Plan Fact Sheet Maybell, Colorado, Disposal Site Fact Sheet December 15, 2011

257

DOE - Office of Legacy Management -- Riverton  

Office of Legacy Management (LM)

Riverton, Wyoming Processing Site Riverton, Wyoming Processing Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Enhanced Characterization of Surficial Aquifer Fact Sheet Where Does My Drinking Water Come From? May 10, 2012: Data Review and Validation Report of May 3, 2012, Sampling Event ALS Environmental Laboratory Report on May 3, 2012, Sampling Event Data Validation Package-June 2013 Groundwater and Surface Water Sampling 2012 Enhanced Characterization and Monitoring Report Riverton, Wyoming, Processing Site Enhanced Characterization of the Surficial Aquifer Riverton, Wyoming, Processing Site Data Summary Report Evaluation of Groundwater Constituents and Seasonal Variation at the Riverton, Wyoming, Processing Site

258

DOE - Office of Legacy Management -- Tuba  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Arizona Arizona Tuba City Disposal Site, Arizona This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Tuba City, Arizona, Disposal Site Annual Groundwater Report April 2012 Through March 2013 Tuba City, Arizona, Disposal Site Communications and Outreach Plan for the Navajo Nation Uranium Mill Tailings Radiation Control Act Sites Data Validation Package-August 2013 Groundwater and Surface Water Sampling Long-Term Surveillance Plan for the Tuba City, Arizona, Disposal Site Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site

259

DOE - Office of Legacy Management -- CEER  

Office of Legacy Management (LM)

Rico Rico Center for Energy and Environment Research (CEER), Puerto Rico This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Fact Sheet Center for Energy and Environment Research, Puerto Rico, Sites Fact Sheet August 2013 Other Documents Facility Description and Historical Background NRC Licenses for the First Floor Biomedical Building August 19, 1982 Inspection Report for CEER (Mayaguez Site) September 26, 1996 CEER Memorandum of Agreement July 19, 1996

260

DOE - Office of Legacy Management -- GJO  

Office of Legacy Management (LM)

Junction Colorado, Site Junction Colorado, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Annual Inspection Report Annual Site Environmental Report Data Validation Package-February 2013 Groundwater and Surface Water Sampling Long-Term Surveillance and Maintenance Plan (June 2006) Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report Annual Site Environmental Report Data Validation Package Environmental Assessment Groundwater Monitoring Reports Long-Term Surveillance Plan Other Documents Fact Sheet

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

DOE - Office of Legacy Management -- Mound Site  

Office of Legacy Management (LM)

Ohio Ohio Mound, Ohio, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Annual Institutional Controls Report Long-Term Stewardship Site Transition Plan Site Sales Agreement Internal Links Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Administrative Records External Links Mound Development Corporation (MDC) Ohio Environmental Protection Agency U.S. Environmental Protection Agency Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Community Involvement General Site Documents

262

DOE - Office of Legacy Management -- Ship  

Office of Legacy Management (LM)

New Mexico New Mexico Shiprock, New Mexico, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Communications and Outreach Plan for the Navajo Nation Uranium Mill Tailings Radiation Control Act Sites Disposal Site Community Information Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Shiprock, New Mexico, Disposal Site Data Validation Package-March 2013 Groundwater and Surface Water Sampling Final Ground Water Compliance Action Plan for Remediation at the Shiprock, New Mexico, UMTRA Site Long-Term Surveillance Plan for the Shiprock Disposal Site, Shiprock, New Mexico Internal Links Environmental Sciences Laboratory (ESL) Reports Webpage

263

DOE - Office of Legacy Management -- Salmon2  

Office of Legacy Management (LM)

Mississippi Mississippi Salmon, Mississippi, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Quitclaim Deed: Assign Surface Real Estate to State of Mississippi Data Validation Package-April 2012 Groundwater and Surface Water Sampling Post-Closure Inspection, Sampling, and Maintenance Report-Calendar Year 2012 Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. Status of Pending Decision Documents Long-Term Surveillance and Maintenance Plan Under revision for 2014 All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Data Validation Packages Post-Closure Inspection, Sampling, and Maintenance Reports

264

DOE - Office of Legacy Management -- Shoal  

Office of Legacy Management (LM)

Nevada Nevada Shoal, Nevada, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Groundwater Monitoring Report Project Shoal Area, Subsurface Corrective Action Unit 447 Data Validation Package-March 2011 Groundwater Sampling Groundwater Model Validation for the Project Shoal Area, Corrective Action Unit 447 NDEP Shoal Document Archives Disclaimer Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Data Validation Package Groundwater Monitoring Reports Public Involvement Plan Other Documents Fact Sheet

265

DOE - Office of Legacy Management -- Blue  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

New Mexico New Mexico Bluewater, New Mexico, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Data Validation Package-May 2013 Groundwater Sampling at Bluewater, New Mexico, Disposal Site 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Site-Bluewater, New Mexico, Disposal Site Long-Term Surveillance Plan for the DOE Bluewater (UMTRCA Title II) Disposal Site, Near Grants, New Mexico Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet

266

DOE - Office of Legacy Management -- Park  

Office of Legacy Management (LM)

West Virginia West Virginia Parkersburg, West Virginia, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2011 Annual Inspection Report for the Parkersburg, West Virginia, Nuclear Waste Policy Act Section 151(c) Disposal Site Data Validation Package-October 2008 Groundwater Sampling Long-Term Surveillance Plan for the Parkersburg, West Virginia, Disposal Site Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Reports Data Validation Package Long-Term Surveillance Plan Fact Sheet

267

DOE - Office of Legacy Management -- Shirley  

Office of Legacy Management (LM)

Wyoming Wyoming Shirley Basin South, Wyoming, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites-Shirley Basin South, Wyoming, Disposal Site Data Validation Package-June 2013 Water Sampling Long-Term Surveillance Plan for the U.S. Department of Energy Shirley Basin South (UMTRCA Title II) Disposal Site, Carbon County, Wyoming Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet

268

DOE - Office of Legacy Management -- Directions  

Office of Legacy Management (LM)

Ohio > Fernald > Visitors Center > Directions Ohio > Fernald > Visitors Center > Directions Fernald Preserve Directions Fernald Preserve Directions Fernald Preserve Home Page Visitors Center Directions Event Calendar Community Meeting Room Guided Tour Educational Field Trip Speaker Request Brochures Fact Sheets Presentations BioBlitz Geocaching Pets Policy Fernald Preserve Coordinates NAD83 State Plane Ohio South Easting 1350546 Northing 476599 Latitude 39.288048 N Longitude 84.683540 W Latitude 39 17' 16.974" N Longitude 84 41' 0.746" W Fernald Preserve Addresses Site: 7400 Willey Road Harrison, OH 45013 Mailing: U.S. Department of Energy 10995 Hamilton-Cleves Hwy. Harrison, OH 45030 U.S. Department of Energy Contractor S.M. Stoller Corporation 10995 Hamilton-Cleves Hwy. Harrison, OH 45030

269

DOE - Office of Legacy Management -- Monticello  

Office of Legacy Management (LM)

Utah Utah Monticello, Utah, Disposal and Processing Sites This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Data Validation Package-April 2013 Groundwater and Surface Water Sampling at Monticello, Utah, Mill Tailings Site Explanation of Significant Difference for the Monticello Mill Tailings Site Long-Term Surveillance and Maintenance Plan for the Monticello NPL Sites Monticello Mill Tailings Site Operable Unit III Final Remedial Investigation Addendum/Focused Feasibility Study Monticello Mill Tailings Site Operable Unit III Post-Record of Decision Monitoring Plan Monticello Mill Tailings Site Operable Unit III Water Quality Compliance Strategy Record of Decision for the Monticello Mill Tailings (USDOE) Site Operable Unit III, Surface Water and Ground Water, Monticello, Utah

270

DOE - Office of Legacy Management -- Lbar  

Office of Legacy Management (LM)

New Mexico New Mexico L-Bar, New Mexico, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Site-L-Bar, New Mexico, Disposal Site Data Validation Package-November 2010 Water Sampling Long-Term Surveillance Plan for the U.S. Department of Energy L-Bar, New Mexico, (UMTRCA Title II) Disposal Site, Seboyeta, New Mexico Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report

271

DOE - Office of Legacy Management -- Gasbuggy  

Office of Legacy Management (LM)

New Mexico New Mexico Gasbuggy, New Mexico, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Interagency Agreement between DOE, BLM, and USDA Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. Status of Pending Decision Documents Long-Term Surveillance Plan Under development All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Data Validation Package Other Documents Fact Sheet Gasbuggy, New Mexico, Site Fact Sheet April 27, 2009 Data Validation Package Gasbuggy, New Mexico, Natural Gas and Produced Water Sampling and Analysis Results for 2012 LMS/GSB/S09448 December 2012

272

DOE - Office of Legacy Management -- AMB  

Office of Legacy Management (LM)

New Mexico New Mexico Ambrosia Lake, New Mexico, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Ambrosia Lake, New Mexico, Disposal Site Data Validation Package-November 2012 Groundwater Sampling Ground Water Compliance Action Plan Long-Term Surveillance Plan for the Ambrosia Lake, New Mexico, Disposal Site Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report

273

DOE - Office of Legacy Management -- Columbus  

Office of Legacy Management (LM)

Ohio Ohio Columbus, Ohio, Sites This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Fact Sheet Columbus, Ohio, Sites Fact Sheet August 2013 Other Documents Closeout of BCLDP Oversight Assessment Report OA-04-13 January 11, 2005 Battelle Columbus Laboratory Decommissioning Project (BCLDP) Oversight Assessments (OA) Report on Documentation and Records July 19 to July 30, 2004 Historical documents may contain links to outside sources. LM cannot attest to the accuracy of information provided by these links.

274

DOE - Office of Legacy Management -- Maxey  

Office of Legacy Management (LM)

Kentucky Kentucky Maxey Flats, Kentucky, Site Key Documents and Links Fact Sheet pdf_icon Project Background pdf_icon U.S. Environmental Protection Agency Maxey Flats Web Page Disclaimer Please be green - do not print these documents unless absolutely necessary Request a paper copy of any document by submitting a Document Request This Site All Sites All LM Quick Search All Site Documents All documents are Adobe Acrobat files. pdf_icon background Maxey Flats Disposal Site: Remedial Investigation Project Background Fact Sheet - Maxey Flats Fact Sheet - Maxey Flats, Kentucky, Site Historical documents may contain links to outside sources. LM cannot attest to the accuracy of information provided by these links. Please see the Privacy and Security page for more details.

275

DOE - Office of Legacy Management -- Lowman  

Office of Legacy Management (LM)

Idaho Idaho Lowman, Idaho, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Lowman, Idaho, Disposal Site Long-Term Surveillance Plan for the U.S. Department of Energy Lowman, Idaho, (UMTRCA Title I) Disposal Site Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report Long-Term Surveillance Plan Fact Sheet Lowman, Idaho, Disposal Site Fact Sheet December 15, 2011

276

DOE - Office of Legacy Management -- Geothermal  

Office of Legacy Management (LM)

Geothermal Test Facility, California Geothermal Test Facility, California This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Other Documents Fact Sheet Geothermal Test Facility, California, Site Fact Sheet December 12, 2011 Other Documents Geothermal Test Facility (GTF) Closure and Records Transfer (DOE/National Nuclear Security Administration memorandum) April 23, 2004 Closure Report East Mesa Geothermal Test Facility July 31, 1998 Recission of Waste Discharge Requirements for U.S. Department of Energy, Geothermal Test Facility, East Mesa - El Centro, Imperial County (California Regional Water Quality Control Board letter) January 4, 1997

277

DOE - Office of Legacy Management -- Gnome  

Office of Legacy Management (LM)

New Mexico New Mexico Gnome-Coach, New Mexico, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Groundwater Monitoring and Inspection Report Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Data Validation Package Monitoring and Inspection Reports Other Documents Fact Sheet Gnome-Coach, New Mexico, Site Fact Sheet April 27, 2009 Monitoring and Inspection Reports 2012 Groundwater Monitoring and Inspection Report Gnome-Coach Site, New Mexico LMS/GNO/S09337 March 2013 2011 Groundwater Monitoring and Inspection Report Gnome-Coach Site, New Mexico

278

DOE - Office of Legacy Management -- GJD  

Office of Legacy Management (LM)

Disposal Site Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Grand Junction, Colorado, Disposal Site Data Validation Package-August 2013 Groundwater Sampling Long-Term Surveillance Plan Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report Data Validation Packages Environmental Assessment Finding of No Significant Impact Ground Water Compliance Action Plan

279

DOE - Office of Legacy Management -- Ashtabula  

Office of Legacy Management (LM)

Ohio Ohio Ashtabula, Ohio, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Fact Sheet Ashtabula, Ohio, Site Fact Sheet August 2013 Other Documents Approve Critical Decision-4 for the Ashtabula Closure Project October 29, 2007 Draft Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy, Ashtabula Closure Project, Ashtabula, Ohio July 2006 Draft Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy, Ashtabula Closure Project, Ashtabula, Ohio March 2006

280

DOE - Office of Legacy Management -- Burrell  

Office of Legacy Management (LM)

Pennsylvania Pennsylvania Burrell, Pennsylvania, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Burrell, Pennsylvania, Disposal Site Data Validation Package-October 2009 Groundwater and Surface Water Sampling Long-Term Surveillance Plan for the U.S. Department of Energy Burrell Vicinity Property, Blairsville, Pennsylvania Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

DOE - Office of Legacy Management -- Fernald Downloads  

Office of Legacy Management (LM)

Ohio > Fernald Downloads Ohio > Fernald Downloads Fernald Preserve, Ohio Environmental Monitoring Data Groundwater Downloads GW Operational 2012 4th Quarter 3rd Quarter 2nd Quarter 1st Quarter 2011 4th Quarter 3rd Quarter 2nd Quarter 1st Quarter 2010 4th Quarter 3rd Quarter 2nd Quarter 1st Quarter 2009 4th Quarter 3rd Quarter 2nd Quarter 1st Quarter 2008 4th Quarter 3rd Quarter 2nd Quarter 1st Quarter 2007 4th Quarter 3rd Quarter 2nd Quarter 1st Quarter 2006 4th Quarter 3rd Quarter 2nd Quarter 1st Quarter On-Site Disposal Facility Downloads LCS and LDS Volumes - Quarterly 2012 4th Quarter LCS 4th Quarter LDS 3rd Quarter LCS 3rd Quarter LDS 2nd Quarter LCS 2nd Quarter LDS 1st Quarter LCS 1st Quarter LDS 2011 4th Quarter LCS 4th Quarter LDS 3rd Quarter LCS 3rd Quarter LDS 2nd Quarter LCS 2nd Quarter LDS

282

DOE - Office of Legacy Management -- Missouri  

Office of Legacy Management (LM)

Missouri Missouri momap Missouri University Research Reactor Site Weldon Spring Site Last Updated: 4292013...

283

DOE - Office of Legacy Management -- Gunnison  

Office of Legacy Management (LM)

Gunnison Gunnison Sites gunmap Gunnison Disposal Site Gunnison Processing Site Last Updated: 4292013...

284

DOE - Office of Legacy Management -- Rio  

Office of Legacy Management (LM)

Hydrologic Monitoring Program Sampling and Analysis Results for 2013 Internal Links Natural Gas Well Monitoring Results Please be green. Do not print these documents unless...

285

DOE - Office of Legacy Management -- Central  

Office of Legacy Management (LM)

Testing In and Chemical Analyses of Water Samples from Deep Exploratory Holes In Little Fish Lake, Monitor, Hot Creek, and Little Smoky Valleys, Nevada USGS-474-90 1971 Central...

286

Office of Legacy Management | Department of Energy  

Energy Savers [EERE]

South Dakota, Disposal Site Edgemont, South Dakota, Disposal Site Read more DOE LM Completes the Grand Junction, Colorado, Site Historical Wall Display DOE LM Completes...

287

DOE - Office of Legacy Management -- Vallecitos  

Office of Legacy Management (LM)

California Vallecitos Nuclear Center, California, Site Key Documents and Links All documents are Adobe Acrobat files. pdficon Key Documents Fact Sheet Please be green. Do not...

288

DOE - Office of Legacy Management -- Pinellas  

Office of Legacy Management (LM)

Monitoring Semiannual Progress Report for the Young - Rainey STAR Center December 2013 Through May 2014 LMSPINN01883 June 2014 Semiannual Progress Report for the 4.5 Acre...

289

DOE - Office of Legacy Management -- Fernald Reports  

Office of Legacy Management (LM)

Annual Site Environmental Report All reports below are Adobe Documents PDF Inspection Reports Site Inspection Reports September 2014 Inspection Report June 2014 Inspection...

290

DOE - Office of Legacy Management -- International Register ...  

Office of Legacy Management (LM)

Spring Grove , Illinois IL.15-1 Evaluation Year: 1987 IL.15-3 Site Operations: Limited testing of centerless grinding techniques for uranium metal for the AEC. IL.15-2 Site...

291

DOE - Office of Legacy Management -- Vallecitos  

Office of Legacy Management (LM)

Center (VNC), a 1,600-acre nuclear research facility and the site of a former electricity-generating nuclear power plant, is located in Sunol, California, about 40 miles...

292

DOE - Office of Legacy Management -- California  

Office of Legacy Management (LM)

Burris Park Site General Atomics Hot Cell Facility Site Vallecitos Nuclear Center Site Geothermal Test Facility Site Laboratory for Energy-Related Health Research Site Oxnard...

293

DOE - Office of Legacy Management -- Rocky Benefits  

Office of Legacy Management (LM)

Colorado > Rocky Benefits Rocky Flats Site, Colorado Benefits Administration Rocky Flats Benefits Administration Rocky Flats Benefits Center P.O Box 9735 Providence, RI 02940 Phone...

294

DOE - Office of Legacy Management -- Amchitka  

Office of Legacy Management (LM)

pdficon Key Documents Fact Sheet Long-Term Surveillance Plan for the U.S. Department of Energy Amchitka, Alaska, Site Record of Decision for Amchitka Surface Closure, Alaska...

295

DOE - Office of Legacy Management -- Hallam  

Office of Legacy Management (LM)

Plan for the Decommissioned Hallam Nuclear Power Facility Hallam, Nebraska Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of...

296

DOE - Office of Legacy Management -- ITL  

Office of Legacy Management (LM)

Links All documents are Adobe Acrobat files. pdficon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of...

297

DOE - Office of Legacy Management -- LEHR  

Office of Legacy Management (LM)

California Laboratory for Energy-Related Health Research (LEHR), California, Site Key Documents and Links All documents are Adobe Acrobat files. pdficon Key Documents Fact Sheet...

298

Geothermal: Sponsored by OSTI -- Reservoir Pressure Management  

Office of Scientific and Technical Information (OSTI)

Reservoir Pressure Management Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On HomeBasic Search About Publications Advanced Search New Hot...

299

Before the House Small Business Committee | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Business Committee Before the House Small Business Committee By: Larry James, Technology Transfer Program Manager, Office of Science Subject: SBIR Reauthorization...

300

DOE Awards Small Business Contract for Support, Planning Services...  

Energy Savers [EERE]

Awards Small Business Contract for Support, Planning Services to Office of Environmental Management DOE Awards Small Business Contract for Support, Planning Services to Office of...

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

EM Launches Forum on Business Opportunities | Department of Energy  

Office of Environmental Management (EM)

Related Articles EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash speaks to participants of EM's Business Opportunity Forum. EM Hosts Business...

302

Business System Clause - Berta Schreiber, Dir, Office of Policy...  

Office of Environmental Management (EM)

Business System Clause - Berta Schreiber, Dir, Office of Policy (MA-61) 2014 DOE Project Management Workshop Business System Clause - Berta Schreiber, Dir, Office of Policy...

303

Department of Energy Idaho - Managers Message  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Manager's Welcome Manager's Welcome Welcome to the U.S. Department of Energy Idaho Operations Office DOE-ID Manager Richard Provencher Welcome to the U.S. Department of Energy's Idaho Operations Office (DOE-ID). We are pleased that you have chosen to visit our Internet site and encourage you to explore the information provided. You may also contact us directly if you have further information needs or interests that are not covered in this web site. In partnership with our contractors, local and regional community, businesses, and other stakeholders, we have focused our effort over the past several years on cleaning up the legacy facilities and contamination at the INL site, and creating new missions focused on performing research and development in energy programs and national defense. Our successes have

304

Counterfeit Components: A Method to Identify and Manage Risk for the Government Contracted Manufacturers and Challenged Small Businesses  

E-Print Network [OSTI]

are important in the understanding of risk levels needed for this paper. With this information an FMEA the co Count many Philip countr Many that w disma their c Figure Ham can assign ntractor and erfeit electro sources. Th pines and M ies... Developing a survey for small businesses using these risk categories Conducting a survey of three small businesses using the survey. With the data, establishing risk level for each category for a FMEA. Finally each company was compared...

Yeager, Richard K.

2011-05-20T23:59:59.000Z

305

FY2006SmallBusinessReport.doc  

Broader source: Energy.gov (indexed) [DOE]

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY ANNUAL REPORT TO THE SECRETARY SMALL BUSINESS PROGRAMS FISCAL YEAR (FY) 2006 Table of Contents I. INTRODUCTION Page 3 II. DEPARTMENT OF ENERGY (DOE) MISSION Page 3 III. OFFICE of SMALL and DISADVANTAGED BUSINESS UTILIZATION (OSDBU) Page 3 IV. LAWS & REGULATIONS Page 3 V. DEPARTMENT OF ENERGY BUSINESS MODEL Page 4 A. Facility Management Contractors (FMC) B. Non-FMCs VI. SMALL BUSINESS GOALS Page 5 A. Government Statutory Goals B. FY 2006 DOE Negotiated Goals VII. PRIME CONTRACT SMALL BUSINESS ACHIEVEMENTS Page 7 A. 8(a) and Small & Disadvantaged Business (SDB) B. Women-Owned Small Business (WOSB) C. HUBZone Small Business

306

Transmission Business Unit Manager  

Broader source: Energy.gov [DOE]

(See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Rocky Mountain Region Transmission Services, (J7300) Transmission Busiess Unit 615...

307

ORNL Small Business Programs Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Us | Us | facebook icon Small Business Programs Office ORNL People News at a Glance Content on this page requires a newer version of Adobe Flash Player. Get Adobe Flash player Small Business Policy Message from the Laboratory Director How to Do Business with ORNL Business Opportunities What we Buy ORNL Fact Sheet Directions to the ORNL Small Business Programs Office Links You May Need Battelle-Managed Laboratories Acquisition Management Services Department Of Energy - Headquarters (DOE-HQ) Department Of Energy - Oak Ridge Operations (DOE-ORO) DOE National Laboratories DOE Office of Small and Disadvantaged Business Utilization (OSDBU) Electronic Subcontracting(eSRS) Reporting System FedBizOpps Federal Acquisition Regulation (FAR) SCORE Set-Aside Alert Opportunities Small Business Administration (SBA)

308

WIPP contractor receives VPP Legacy of Stars Award 2013  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Management and Operating Contractor Management and Operating Contractor Recognized for Continuous Safety Performance CARLSBAD, N.M., September 20, 2013 - The U.S. Department of Energy (DOE) recognized Nuclear Waste Partnership LLC (NWP), the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor, with the Voluntary Protection Program (VPP) Legacy of Stars Award in latter August 2013. "Safety is central to everything we do, and achieving this elite designation validates our work and the safety-focused culture we strive to create," said Farok Sharif, NWP President and Project Manager, who received the award with Kevin Miller, United Steel Workers Local Bargaining Unit VPP Ombudsman, at the VPP Participants' Association National Conference

309

Quality assurance program plan for cesium legacy project  

SciTech Connect (OSTI)

This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents.

Tanke, J.M.

1997-05-22T23:59:59.000Z

310

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect (OSTI)

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

311

Leveraging Aboriginal Tourism Legacy Benefits from the 2010 Olympics: A Case  

E-Print Network [OSTI]

Leveraging Aboriginal Tourism Legacy Benefits from the 2010 Olympics: A Case Study of Whistler: Master of Resource Management (Planning) Report No. : 606 Title of Project: Leveraging Aboriginal Tourism-established, and also signaled that the power the First Nations will likely increase with respect to local and tourism

312

Small Businesses: 101 on Doing Business with the Department of Energy |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Working with Us » Small Businesses: 101 on Doing Business with the Working with Us » Small Businesses: 101 on Doing Business with the Department of Energy Small Businesses: 101 on Doing Business with the Department of Energy Start your research about procurement opportunities with our Facility Management Contractors, since 85% of our procurement dollars are obligated to them. Each Facility Management Contractor has the responsibility of managing and operating a particular Energy site and has its own buying authority. Download the Contact Directory in order to contact our facility management contractors' Small Business Program Managers d. Review each facility management contractor's website to identify projects and potential contracting opportunities that they might be interested in. (1) Doing your research: Check out our Small Business Opportunities Tool. You can browse

313

Small Business Opportunities | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Small Business Opportunities Small Business Opportunities Small Business Opportunities The Office of Environmental Management (EM) has a long history of support to the Department of Energy's (DOE) Small Business Program and a strong commitment to increasing small business awards to prime contractors and subcontractors to perform EM mission-critical work. In Fiscal Years 2010, 2011, and 2012, EM awarded over $1 Billion to small businesses. To further EM's commitment to small business, we are providing a series of informative links pertaining to small business, including direct links to Small Business Program Managers for each EM site conducting work for the Department of Energy. We suggest that each small business with interest in working for the Department of Energy review the information provided and

314

INDIANAPOLIS LEAVES A LEGACY OF ENERGY EFFICIENCY  

Broader source: Energy.gov [DOE]

The City of Indianapolis, Indiana, used its status as host of the 2012 Super Bowl to address inefficiencies in the areas older housing stock and leave behind a legacy of energy efficiency. Seeking...

315

A Business Process Explorer: Recovering Business Processes from Business Applications  

E-Print Network [OSTI]

1 A Business Process Explorer: Recovering Business Processes from Business Applications Jin Guo and software developers. We present a business process explorer tool which automatically recovers business of business applications, we developed a business process explorer tool which recovers as-implemented business

Zou, Ying

316

Business Operations  

Office of Energy Efficiency and Renewable Energy (EERE)

The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) business products, processes, and systems. The three main offices of...

317

DOE Announces Small Business Awards at its Annual Small Business Conference  

Broader source: Energy.gov (indexed) [DOE]

Small Business Awards at its Annual Small Business Small Business Awards at its Annual Small Business Conference in San Antonio, Texas DOE Announces Small Business Awards at its Annual Small Business Conference in San Antonio, Texas June 25, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the winners of DOE's 2007 Secretarial Small Business Awards during a ceremony for its 9th Annual Small Business Conference in San Antonio, Texas. DOE's Small Business Awards program was established to recognize performance by departmental offices, facility management contractors and small business ventures on an annual basis. "Small businesses are a critical part of the fabric of the American economy, and the Department of Energy will continue to provide an environment in which these businesses can thrive and prosper," Acting

318

DOE Announces Small Business Awards at its Annual Small Business Conference  

Broader source: Energy.gov (indexed) [DOE]

Announces Small Business Awards at its Annual Small Business Announces Small Business Awards at its Annual Small Business Conference in San Antonio, Texas DOE Announces Small Business Awards at its Annual Small Business Conference in San Antonio, Texas June 25, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the winners of DOE's 2007 Secretarial Small Business Awards during a ceremony for its 9th Annual Small Business Conference in San Antonio, Texas. DOE's Small Business Awards program was established to recognize performance by departmental offices, facility management contractors and small business ventures on an annual basis. "Small businesses are a critical part of the fabric of the American economy, and the Department of Energy will continue to provide an environment in which these businesses can thrive and prosper," Acting

319

Small Business | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Small Business Home > About Us > Our Operations > Acquisition and Project Management > Small Business Small Business NNSA's Small Business program serves as the Info-structure through which NNSA effectively disseminates information regarding our small business

320

Small Business Toolbox | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Toolbox | National Nuclear Security Administration Toolbox | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Small Business Toolbox Home > About Us > Our Operations > Acquisition and Project Management > Small Business > Small Business Toolbox Small Business Toolbox NNSA's Small Business program serves as the Info-structure through which

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Small Business Internet Sites  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(DOE) - (DOE) - http://www.energy.gov DOE OSDBU -- DOE Small Business Forecast, DOE's Special Emphasis Programs: Mentor-Protégé, 8(a) Pilot, Women-owned Small Business Program, List of SB Program Managers, and other Web Links. http://smallbusiness.energy.gov or http://www.hr.doe.gov/ED/OSDBU/Osdbu.html DOE's Annual Small Business Procurement Conference - http://www.smallbusiness-outreach.doe.gov/ Office of Economic Impact and Diversity --Parent Organization to the OSDBU - http://www.hr.doe.gov/ED/index.html Forecast of Prime and Subcontracting Business Opportunities -- http://hqlnc.doe.gov/support/smallbusutil.nsf/Index?openform DOE Phone Directory - http://phonebook.doe.gov/callup.html DOE's Linked Organizational Chart -- Link to any DOE program element offices --

322

Updated Appendices to the Status of Environmental Management...  

Office of Environmental Management (EM)

Updated Appendices to the Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War...

323

LM Records and Information Management Transition Guidance (January 2015)  

Broader source: Energy.gov [DOE]

This guidance document establishes a framework for developing a Records and Information Management Transition Plan as part of the overall transition effort for a legacy site.

324

small business | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

National Nuclear Security Administration (NNSA) recently selected five small-business-led teams for its new Management, Organizational and Administrative Support Services Small...

325

Business, Economics & Informatics  

E-Print Network [OSTI]

External Relations Finance Planning & Business Systems Estates and Facilities Human Resources Vice Master and Screen Media Department of Media and Cultural Studies Department of European Cultures and Languages, Mathematics and Statistics Department of Management Department of Computer Science and Informatics Department

Cocea, Mihaela

326

Controlling Beryllium Contaminated Material And Equipment For The Building 9201-5 Legacy Material Disposition Project  

SciTech Connect (OSTI)

This position paper addresses the management of beryllium contamination on legacy waste. The goal of the beryllium management program is to protect human health and the environment by preventing the release of beryllium through controlling surface contamination. Studies have shown by controlling beryllium surface contamination, potential airborne contamination is reduced or eliminated. Although there are areas in Building 9201-5 that are contaminated with radioactive materials and mercury, only beryllium contamination is addressed in this management plan. The overall goal of this initiative is the compliant packaging and disposal of beryllium waste from the 9201-5 Legacy Material Removal (LMR) Project to ensure that beryllium surface contamination and any potential airborne release of beryllium is controlled to levels as low as practicable in accordance with 10 CFR 850.25.

Reynolds, T. D.; Easterling, S. D.

2010-10-01T23:59:59.000Z

327

Comparison of New and Legacy TATBs  

SciTech Connect (OSTI)

Two newly synthesized versions of the insensitive high explosive (IHE) 1,3,5-triamino-2,4,6-trinitrobenzenes (TATBs) were compared to two legacy explosives currently used by the Department of Energy. Except for thermal analysis, small scale safety tests could not distinguish between the different synthetic routes. Morphologies of new TATBs were less faceted and more spherical. The particle size distribution of one new material was similar to legacy TATBs, but the other was very fine. Densities and submicron structure of the new TATBs were also significantly different from the legacy explosives. Pressed pellets of the new explosives were less dense. Recrystallization from sulfolane improved the density and thermal stability of both new TATBs, though the morphology of the recrystallized TATB was nearly hexagonal platelets.

Hoffman, D M; Willey, T M; Mitchell, A R; DePiero, S C

2007-11-08T23:59:59.000Z

328

COLORADO STATE-WIDE FOREST LEGACY ASSESSMENT OF NEED  

E-Print Network [OSTI]

for property owners. These ten criteria were developed through a survey conducted as part of this AON and for identification of Forest Legacy Areas (FLA's) within the state. Section 1 of this document presents information of which influence Forest Legacy Program implementation. Section 2 presents the Forest Legacy Area (FLA

329

Goal-Driven business process derivation  

Science Journals Connector (OSTI)

Solutions to the problem of deriving business processes from goals are critical in addressing a variety of challenges facing the services and business process management community, and in particular, the challenge of quickly generating large numbers ... Keywords: business process, capabilities, goals, tasks

Aditya K. Ghose; Nanjangud C. Narendra; Karthikeyan Ponnalagu; Anurag Panda; Atul Gohad

2011-12-01T23:59:59.000Z

330

lubar.uwm.edu Master of Business Administration  

E-Print Network [OSTI]

Enterprise Resource Planning and Control Bus Adm 783 Supply Chain Management eBusiness Choose four and Effective Management Bus Mgmt 723 Managing and Negotiating Across Cultures Management of Human Resources Cultures Bus Mgmt 726 Study Abroad: Business Topics Information Technology Management Choose four

Saldin, Dilano

331

Legacy Environmental Solutions | Open Energy Information  

Open Energy Info (EERE)

Legacy Environmental Solutions Legacy Environmental Solutions Jump to: navigation, search Logo: Legacy Environmental Solutions Name Legacy Environmental Solutions Address 9878 Main St Suite 105 Place Woodstock, Georgia Zip 30188 Sector Services, Solar Product AET and eShield Therma Reflective Insulation Year founded 2009 Number of employees 1-10 Phone number 678-919-9236 Website http://www.legacyenvironmental Coordinates 34.0809659°, -84.522443° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":34.0809659,"lon":-84.522443,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

332

In Lewes, a legacy of service  

E-Print Network [OSTI]

In Lewes, a legacy of service to agriculture PAGE 31 Bridgeville's Newton family has deep ties offering programs in Bethany Beach. 7 Cape stars. Rebecca Pepper and Jacki Coveleski have taken their love research. Delaware is the number two producer of lima beans in the U.S., and a research project could put

Firestone, Jeremy

333

The Economic Legacy of Mahmoud Ahmadinejad  

E-Print Network [OSTI]

The Economic Legacy of Mahmoud Ahmadinejad Prof. Nader Habibi Mahmoud Ahmadinejad, Iran's sixth and working-class Iranians. His campaign promises regarding redistributing wealth, enlarging economic, during his two terms in office, Ahmadinejad indeed implemented a number of important economic reforms

Snider, Barry B.

334

Overview of the Government of Canada Nuclear Legacy Liabilities Program - 13551  

SciTech Connect (OSTI)

Nuclear legacy liabilities have resulted from more than 60 years of nuclear research and development carried out on behalf of Canada. The liabilities are located at Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories in Ontario and Whiteshell Laboratories in Manitoba, as well as three shutdown prototype reactors in Ontario and Quebec that are being maintained in a safe storage state. Estimated at about $7.4 billion (current day dollars), these liabilities consist of disused nuclear facilities and associated infrastructure, a wide variety of buried and stored waste, and contaminated lands. In 2006, the Government of Canada adopted a long-term strategy to deal with the nuclear legacy liabilities and initiated a five-year, $520 million start-up phase, thereby creating the Nuclear Legacy Liabilities Program (NLLP). The Government of Canada renewed the NLLP in 2011 with a $439-million three-year second phase that ends March 31, 2014. The projects and activities carried out under the Program focus on infrastructure decommissioning, environmental restoration, improving the management of legacy radioactive waste, and advancing the long-term strategy. The NLLP is being implemented through a Memorandum of Understanding between Natural Resources Canada (NRCan) and AECL whereby NRCan is responsible for policy direction and oversight, including control of funding, and AECL is responsible for implementing the program of work and holding and administering all licences, facilities and lands. (authors)

Metcalfe, D.; McCauley, D. [Natural Resources Canada, Ottawa, Ontario, K1A 0E4 (Canada)] [Natural Resources Canada, Ottawa, Ontario, K1A 0E4 (Canada); Miller, J.; Brooks, S. [Atomic Energy of Canada Limited, Chalk River, Ontario, K0J 1J0 (Canada)] [Atomic Energy of Canada Limited, Chalk River, Ontario, K0J 1J0 (Canada)

2013-07-01T23:59:59.000Z

335

small business  

National Nuclear Security Administration (NNSA)

2%2A en Small Business http:nnsa.energy.govaboutusouroperationsapmsmallbusiness

Page...

336

Modeling languages for business processes and business rules: A representational analysis  

Science Journals Connector (OSTI)

Process modeling and rule modeling languages are both used to document organizational policies and procedures. To date, their synergies and overlap are under-researched. Understanding the relationship between the two modeling types would allow organizations ... Keywords: BPMN, BWW, Business process management, Business process modeling, Business rule modeling, PRR, Representation theory, SBVR, SRML, SWRL

Michael zur Muehlen; Marta Indulska

2010-06-01T23:59:59.000Z

337

Master of Business Services Science (MBSS)Master of Business Services Science (MBSS) Competitive  

E-Print Network [OSTI]

Service and System Operations Support System Architecture Engineering Enduring Systems Common casesMaster of Business Services Science (MBSS)Master of Business Services Science (MBSS) Intro to Competitive Advantage & AnthropologyFoundation ServicesIntro to Business SS Advantage & Management of Services

Su, Xiao

338

NNSA and Small Business Partnering for Success  

Broader source: Energy.gov (indexed) [DOE]

Doing Business with the Doing Business with the Doing Business with the Doing Business with the National Nuclear Security National Nuclear Security Administration Administration Gary G. Lyttek, NNSA Business Source Manager Gary G. Lyttek, NNSA Business Source Manager Department of Energy's Business Opportunity Session Our Mission Our Mission To support the National Nuclear Security To support the National Nuclear Security Administration Administration ' ' s goal of s goal of " " strengthening United States strengthening United States ' ' security through the military application of nuclear security through the military application of nuclear energy and by reducing the global threat from terrorism energy and by reducing the global threat from terrorism and weapons of mass destruction and weapons of mass destruction

339

DOE Recognized for Small Business Achievement | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Recognized for Small Business Achievement Recognized for Small Business Achievement DOE Recognized for Small Business Achievement November 20, 2008 - 4:58pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced it has met all goals of the Small Business Administration (SBA) Scorecard for Fiscal Year 2007. DOE was one of only three federal agencies to meet these goals. The SBA Scorecard is an annual measurement of federal agencies' efforts to develop and encourage relationships with small businesses. The Department met its goals in contracting with businesses in all five of the SBA's categories: small businesses; small disadvantaged businesses; women-owned small businesses; HUBZone small businesses; and small businesses owned by service-disabled veterans. "Our small business program managers have led outstanding outreach efforts

340

The Small Business Conference Small Businesses Don't Want to Miss |  

Broader source: Energy.gov (indexed) [DOE]

The Small Business Conference Small Businesses Don't Want to Miss The Small Business Conference Small Businesses Don't Want to Miss The Small Business Conference Small Businesses Don't Want to Miss December 14, 2010 - 3:53pm Addthis Bill Valdez Bill Valdez Principal Deputy Director Alice Hwang has a lot on her plate. As the CEO and CFO of Advanced Technologies and Laboratories International, Inc. (ATL), a 150 employee technical and management consulting firm located in Germantown, Maryland, Ms. Hwang oversees her company's budget, manages projects and technical activities, and directs the financial, accounting, human resources, and IT infrastructure needed to keep the company running and growing. As a small business owner, Ms. Hwang is accustomed to finding creative solutions to address multiple challenges. The small businesses and the

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Ramp-up Management as an Approach to Mitigating Instability in the Adaptation of Solution Spaces in High-Variety Business Environments  

Science Journals Connector (OSTI)

Abstract In today's markets companies are oftentimes forced to offer a broad product variety, so that they can meet the individual requirements of their customers. Being confronted with such high-variety business environments, suppliers need to practice solution space development, i.e. understanding the customers idiosyncratic needs and deriving a suitable set of product variants from this knowledge. The diversification of customer demand must not lead to an ill-considered proliferation of variants in a firm's product offering, but any reconsideration of an existing product portfolio has to be done in a careful and purposeful manner: offering limitless choice is economically unfeasible and product variety should only be offered for those product attributes along which customer needs diverge and that can be aligned with the existing product architecture. However, due to unexpected changes in customer preferences, technical turbulences or faulty interpretations of the manufacturer during the development of the initial product offering, an adaptation of the existing solution space of product variants might become necessary at any given time. Whenever such a misfit between the existing product offering and the current customer demand occurs, firms are forced to introduce new product variants to the market. Such an addition of product variants may disrupt the available manufacturing system and cause significant instabilities in the respective value creation processes. This paper investigates whether the implementation of ramp-up management can mitigate the negative effects of this instability.

Frank Steiner

2014-01-01T23:59:59.000Z

342

U.S. Department of Energy to Host Press Call on Transition of Legacy Cleanup Work at Los Alamos National Laboratory  

Broader source: Energy.gov [DOE]

On Wednesday, December 3, 2014, the Office of Environmental Management (EM) and the National Nuclear Security Administration (NNSA) will host a press call to discuss the Departments plans for transitioning management and oversight of the legacy environmental cleanup work at Los Alamos National Laboratory from NNSA to EM.

343

Initiating Business with INL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Initiating Business with INL The INL Small Business Program Office (SBPO) serves as the advocate and point of contact for businesses seeking contracting opportunities. We ask you...

344

NETL Business Opportunities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Business Opportunities Business Forms Contacts NETL offers many business opportunities, using a variety of contract and funding vehicles. Solicitations and Funding Opportunities...

345

Repackaging Rocky Flats Legacy Transuranic Waste  

SciTech Connect (OSTI)

Repackaging legacy Transuranic (TRU), Transuranic Mixed (TRM), Low Level Waste (LLW), and Low Level Mixed (LLM) waste requires good characterization skills and the ability to adapt to less than ideal conditions. Repackaging legacy waste in a facility that is not undergoing Decontamination and Decommission (D and D) is optimum. However, repackaging any waste in a D and D facility, under cold and dark conditions, can be difficult. Cold and dark conditions are when the heating and air conditioning are no longer in service and the lighting consists of strands of lights hung throughout each of the rooms. Working under these conditions adds an additional level of stress and danger that must be addressed. The use of glovebags was very useful at Rocky Flats during the D and D of many buildings. Glovebags can be adapted for many different types of wastes and unusual conditions. Repackaging of legacy TRU waste, in a D and D facility, can be accomplished safely and cost effectively with the use of glovebags. In conclusion: the use of glovebags to repackage legacy TRU, TRM, LLW, or LLM waste was done safely and cost effectively at Rocky Flats. The cost of using glovebags was minimal. Glovebags are easily adaptable to whatever the waste configuration is. The use of glovebags, for repackaging of Legacy waste, allows D and D efforts to stay on schedule and on task. Without the use of glovebags, additional gloveboxes would have been required at Rocky Flats. Larger items, such as the HEPA filters, would have required the construction of a new large item repackaging glovebox. Repackaging in glovebags allows the freedom to either locate the glovebag by the waste or locate the glovebag in a place that least impacts D and D efforts. The use of glovebags allowed numerous configurations of waste to be repackaged without the use of gloveboxes. During the D and D of the Rocky Flats facility, which was in a cold and dark stage, D and D work was not impacted by the repackaging activity. Glovebags work well in facilities that are in the process of D and D or still in full operations because glovebags are very safe and cost effective.

McTaggart, Jerri Lynne [Los Alamos National Laboratory, 115 N. Main St., Carlsbad, New Mexico, 88220 (United States)

2008-01-15T23:59:59.000Z

346

Office of Environmental Management's Hanford Site Awards $99M...  

Broader source: Energy.gov (indexed) [DOE]

Office of Environmental Management's Hanford Site Awards 99M Contract to Small Business Office of Environmental Management's Hanford Site Awards 99M Contract to Small Business...

347

Conversations and Connections - The Expertise of our Small Business  

Broader source: Energy.gov (indexed) [DOE]

Conversations and Connections - The Expertise of our Small Conversations and Connections - The Expertise of our Small Business Program Managers Conversations and Connections - The Expertise of our Small Business Program Managers August 20, 2012 - 2:57pm Addthis Freda Hopper serves as a Small Business Program Manager at Oak Ridge Operations Office, helping small businesses learn how to work with the Department and access contract opportunities. Here, she joins Dot Harris (at podium) at a Small Business Summit in Oak Ridge this July. Freda Hopper serves as a Small Business Program Manager at Oak Ridge Operations Office, helping small businesses learn how to work with the Department and access contract opportunities. Here, she joins Dot Harris (at podium) at a Small Business Summit in Oak Ridge this July. John Hale III John Hale III

348

Conversations and Connections - The Expertise of our Small Business  

Broader source: Energy.gov (indexed) [DOE]

Conversations and Connections - The Expertise of our Small Conversations and Connections - The Expertise of our Small Business Program Managers Conversations and Connections - The Expertise of our Small Business Program Managers August 20, 2012 - 2:57pm Addthis Freda Hopper serves as a Small Business Program Manager at Oak Ridge Operations Office, helping small businesses learn how to work with the Department and access contract opportunities. Here, she joins Dot Harris (at podium) at a Small Business Summit in Oak Ridge this July. Freda Hopper serves as a Small Business Program Manager at Oak Ridge Operations Office, helping small businesses learn how to work with the Department and access contract opportunities. Here, she joins Dot Harris (at podium) at a Small Business Summit in Oak Ridge this July. John Hale III John Hale III

349

Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule  

Broader source: Energy.gov (indexed) [DOE]

July 27, 2011 July 27, 2011 Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule RICHLAND, Wash. - The Hanford Site re- cently surpassed American Recovery and Reinvestment Act goals to accelerate the cleanup of legacy waste and fuels. Workers recently achieved three waste management goals ahead of a Sept. 30, 2011 target. The three goals focus on re- ducing Hanford's onsite waste inventory as part of the work funded by $1.6 billion the Richland Operations Office received from the Recovery Act. The three goals are: * Retrieve 50 cubic meters of Remote-Handled (RH) Transuranic (TRU) waste. Workers have re- trieved 84 cubic meters of the waste to date. Compared to contact-handled TRU waste, RH TRU waste requires additional radiation dose

350

E-Print Network 3.0 - arabia environmental legacy Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

by inherited legacies on environmental... : Evidences from Deforestation Sebastien Marchand Abstract This paper investigates if inherited legacies (i... .e legal origins on law...

351

NNSA Small Business Week 2012: Small businesses play vital role at LANL |  

National Nuclear Security Administration (NNSA)

Small businesses play vital role at LANL | Small businesses play vital role at LANL | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA Small Business Week 2012: Small businesses ... NNSA Small Business Week 2012: Small businesses play vital role at LANL Posted By Office of Public Affairs Small businesses continue to play a vital role in the day-to-day operations

352

Lister at home and abroad: a continuing legacy  

Science Journals Connector (OSTI)

...Hurwitz and Marguerite Dupree Lister at home and abroad: a continuing legacy M. Anne...imperial sentiment, and his legacy is seen at home and abroad through successive generations...Some might travel no farther than their home towns in Scotland and England, but others...

2013-01-01T23:59:59.000Z

353

Small Business Sourcing System | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Sourcing System | National Nuclear Security Administration Sourcing System | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Small Business Sourcing System Home > About Us > Our Operations > Acquisition and Project Management > Small Business > Small Business Toolbox > Small Business Sourcing System Small Business Sourcing System

354

REMOVAL OF LEGACY PLUTONIUM MATERIALS FROM SWEDEN  

SciTech Connect (OSTI)

U.S. Department of Energys National Nuclear Security Administration (NNSA) Office of Global Threat Reduction (GTRI) recently removed legacy plutonium materials from Sweden in collaboration with AB SVAFO, Sweden. This paper details the activities undertaken through the U.S. receiving site (Savannah River Site (SRS)) to support the characterization, stabilization, packaging and removal of legacy plutonium materials from Sweden in 2012. This effort was undertaken as part of GTRIs Gap Materials Program and culminated with the successful removal of plutonium from Sweden as announced at the 2012 Nuclear Security Summit. The removal and shipment of plutonium materials to the United States was the first of its kind under NNSAs Global Threat Reduction Initiative. The Environmental Assessment for the U.S. receipt of gap plutonium material was approved in May 2010. Since then, the multi-year process yielded many first time accomplishments associated with plutonium packaging and transport activities including the application of the of DOE-STD-3013 stabilization requirements to treat plutonium materials outside the U.S., the development of an acceptance criteria for receipt of plutonium from a foreign country, the development and application of a versatile process flow sheet for the packaging of legacy plutonium materials, the identification of a plutonium container configuration, the first international certificate validation of the 9975 shipping package and the first intercontinental shipment using the 9975 shipping package. This paper will detail the technical considerations in developing the packaging process flow sheet, defining the key elements of the flow sheet and its implementation, determining the criteria used in the selection of the transport package, developing the technical basis for the package certificate amendment and the reviews with multiple licensing authorities and most importantly integrating the technical activities with the Swedish partners.

Dunn, Kerry A. [Savannah River National Laboratory; Bellamy, J. Steve [Savannah River National Laboratory; Chandler, Greg T. [Savannah River National Laboratory; Iyer, Natraj C. [U.S. Department of Energy, National Nuclear Security Administration, Office of; Koenig, Rich E.; Leduc, D. [Savannah River National Laboratory; Hackney, B. [Savannah River National Laboratory; Leduc, Dan R. [Savannah River National Laboratory

2013-08-18T23:59:59.000Z

355

The future electricity business  

SciTech Connect (OSTI)

The transition of the electricity business into the competitive market will result in change as significant as that brought about by the PC or the deregulation of telecommunications,and with it opportunities for new products, service, and technologies, particularly to support an increase in distributed generation. The electricity business has been viewed as having three building blocks--generation, transmission, and distribution. Almost all investments in these three sectors historically have been made by utilities, but now these investments have begun to be made by customers or new entrants under a competitive market model. With the high-voltage transmission system largely built, the business focus will shift to efficient utilization of that infrastructure through investments in grid automation control, communications, and network management. And while the primary function of the distribution system--connecting customers to the utility grid--will remain unchanged, there will be new requirements on the distribution system to integrate distributed technologies and customer micro grids. Generation power plants are as likely to be located at customer sites as at utility or central-station sites. Customers may choose to create micro grids that are locally self sufficient and may or may not be connected to the utility grid. The characteristics of the distribution grid are likely to change from a one-way system in which power flows from utility central-station power plants to customers, to a two-way system in which power may flow in either direction. Hence, the focus will increasingly shift to integration of portfolio of distributed technologies. The opening of the electricity business to competition also opens new markets and business opportunities for new entrants.

Budhraja, V.S.

1999-11-01T23:59:59.000Z

356

A Shining Example of Dr. King's legacy | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

A Shining Example of Dr. King's legacy A Shining Example of Dr. King's legacy A Shining Example of Dr. King's legacy January 9, 2013 - 11:27am Addthis A Shining Example of Dr. King’s legacy Kathy Chambers Senior Science and Technical Information Specialist, OSTI Editor's Note: This blog was originally posted on OSTI's blog. As America celebrates Martin Luther King's birthday and focuses on how far this nation has come for all people, the Energy Department's .EDUconnections is pleased to honor Delaware State University (DSU). DSU is a shining example of Dr. King's extraordinary legacy of progress and education. Founded in 1891, DSU became one of the country's first land-grant educational institutions and is now a Historically Black College and University. DSU has a proud heritage of research, and today focuses on

357

FY 2011 Secretarial Small Business Award Winners | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FY 2011 Secretarial Small Business Award Winners FY 2011 Secretarial Small Business Award Winners FY 2011 Secretarial Small Business Award Winners Federal Small Business Program Manager of the Year Winner: Gary Bridges, Small Business Program Manager - Tulsa, Oklahoma Gary Bridges has worked with Southwestern Power Administration since 1987 but has held positions at other Federal agencies since 1978. Bridges is responsible for initiating increased contracting with small businesses at the Southwestern Power Administration. He worked closely with the acquisition staff to ensure that small businesses were given opportunities to be awarded contracts. While all contract types were made available, Bridges focused primarily on outreach to small businesses that specialized in construction. "My main goal is to ensure that small businesses have

358

FY 2011 Secretarial Small Business Award Winners | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

FY 2011 Secretarial Small Business Award Winners FY 2011 Secretarial Small Business Award Winners FY 2011 Secretarial Small Business Award Winners Federal Small Business Program Manager of the Year Winner: Gary Bridges, Small Business Program Manager - Tulsa, Oklahoma Gary Bridges has worked with Southwestern Power Administration since 1987 but has held positions at other Federal agencies since 1978. Bridges is responsible for initiating increased contracting with small businesses at the Southwestern Power Administration. He worked closely with the acquisition staff to ensure that small businesses were given opportunities to be awarded contracts. While all contract types were made available, Bridges focused primarily on outreach to small businesses that specialized in construction. "My main goal is to ensure that small businesses have

359

Workplace Training Module: Enhancing Ecotourism Business Performance  

E-Print Network [OSTI]

Workplace Training Module: Enhancing Ecotourism Business Performance (Level 5 ­ 10 credits as part on understanding best practice in ecotourism development and management (see second part of Appendix 1). The module focuses on the ecotourism business dimension ­ emphasizing best case examples of what creates successful

360

Feasibility of SOA in a Legacy Environment  

E-Print Network [OSTI]

Service Oriented Architecture (SOA) is currently viewed as the silver bullet solution for all of the integration issues that a business faces in this very competitive world. SOA technologies vendors would also like everyone to believe the silver...

Anjum, Naveed

2008-12-19T23:59:59.000Z

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

EM Hosts Business Opportunity Forum | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

- 3:00pm Addthis EM Acquisition and Project Management Deputy Assistant Secretary Jack Surash speaks to participants of EM's Business Opportunity Forum. EM Acquisition and Project...

362

2011 Annual Planning Summary for EM Consolidated Business Center (EMCBC)  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the EM Consolidated Business Center (EMCBC) (See Environmental Management APS).

363

Celebrating Small Business Week at the Energy Department | Department...  

Office of Environmental Management (EM)

first' philosophy and policy at the Department of Energy. Small businesses are at the heart of our work. From professional program management and facilities operations to...

364

Department of Energy Small Business Conference Starts Today in...  

Broader source: Energy.gov (indexed) [DOE]

Solutions, LLC (Richland, WA) Management & Operations Small Business Special Recognition: Princeton Plasma Physics Laboratory (Princeton, NJ) DOE Mentor of the Year: IBM...

365

Small Business Innovation Research (SBIR) and Small Business...  

Broader source: Energy.gov (indexed) [DOE]

Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) An...

366

Department of Energy Business Opportunity Session  

Broader source: Energy.gov (indexed) [DOE]

Maria M. Mitchell Maria M. Mitchell Title: Contracting Officer/Small Business Program Manager E-Mail: mitchemm@id.doe.gov Phone: 208-526-8600 Website: http://www.id.doe.gov/ DOE - Idaho Operations Office Department of Energy's Business Opportunity Session DOE - Idaho Operations Office DOE-ID Goals for Mission Success: 1. Laboratory Management * Nuclear energy and national security research and development 2. Environmental Management * Safe and cost effective cleanup 3. Corporate Management * Efficient, reliable and safe completion of DOE/INL Site missions The U.S. Department of Energy (DOE) is committed to increasing the contracting opportunities awarded to small and disadvantaged businesses at the prime contracting level. Department of Energy's Business Opportunity Session DOE - Idaho Operations Office

367

Feasibility Study for a New Business Jet  

E-Print Network [OSTI]

This report demonstrates details of a feasibility study of a new business jet as an effort to complete the requirements for a field project (EMGT 835) in Engineering Management. The study is conducted during global economic crisis to identify a...

Mousa, Yasser Abdullah

2009-05-15T23:59:59.000Z

368

Running Process Plant Utilities Like a Business  

E-Print Network [OSTI]

utility managers facing the same problem of trying to run their units along business lines can adopt those characteristics of the described model that meet their needs, learn from the experience of Pemex Petroquimica in applying these systems to real...

Pavone, A.

369

West Virginia University 1 College of Business and Economics  

E-Print Network [OSTI]

.D. in business administration, and the M.A. and Ph.D. in economics programs require a bachelor's degree from a, statistics, public policy, history, and other humanities majors. The master of business administration (M areas of business and provides a broad general management orientation. The M.B.A. program is offered

Mohaghegh, Shahab

370

Business Metadata: Capturing Enterprise Knowledge: Capturing Enterprise Knowledge  

Science Journals Connector (OSTI)

People have a hard time communicating, and also have a hard time finding business knowledge in the environment. With the sophistication of search technologies like Google, business people expect to be able to get their questions answered about the business ... Keywords: Database Management

William H. Inmon; Bonnie O'Neil; Lowell Fryman

2007-09-01T23:59:59.000Z

371

Zugang Liu, Ph.D. Department of Business  

E-Print Network [OSTI]

Zugang Liu, Ph.D. Department of Business and Economics Pennsylvania State University Hazleton, PA, 08071 Trisha D. Anderson, Ph.D. School of Business Administration Texas Wesleyan University Fort Worth, TX, 76105 Jose M. Cruz, Ph.D. Department of Operations and Information Management School of Business

Nagurney, Anna

372

http://stir.ac.uk/4l Why study Management?  

E-Print Network [OSTI]

Business Studies and Management Science. It equips you with two things: a broad understanding of business of doing things. The course A Management degree combines Business Studies and Management Science and resources. Management develops the skills and the analytical approach in relation to business systems

Little, Tony

373

Disintermediation of traditional chemical intermediary roles in the Electronic Business-to-Business (e-B2B) exchange world  

Science Journals Connector (OSTI)

The traditional chemical distribution industry is a multi-billion dollar business and with the introduction of Electronic Business-to-Business (e-B2B) exchanges to the global chemical industry there is some concern about the future roles of traditional ... Keywords: Chemical industry, Disintermediation, Supply chain management, e-B2B exchanges

Kin Bee Tay; John Chelliah

2011-09-01T23:59:59.000Z

374

Value increasing business model for e-hospital  

Science Journals Connector (OSTI)

This paper developed a business value increasing model for electronic hospital (e-hospital) based on electronic value chain analysis. From this model, 58 hospital electronic business (e-business) solutions were developed. Additionally, this paper investigated the adoption patterns of these 58 e-business solutions within six US leading hospitals. The findings show that only 36 of 58 or 62% of the e-business solutions are fully or partially implemented within the six hospitals. Ultimately, the research results will be beneficial to managers and executives for accelerating e-business adoptions for e-hospital.

Robert Null; June Wei

2009-01-01T23:59:59.000Z

375

Federal royalty oil eligibility requirements: the plateau legacy  

SciTech Connect (OSTI)

The courts ruled in the 1979 Plateau decision that the Secretary of the Interior is obligated to allocate federal royalty oil among all refineries not having their own crude oil source of supply, and can not impose Small Business Administration (SBA) eligibility requirements on potential purchasers of federal royalty oil. The effects of this decision was to derail the government's attempt to make royalty oil produced from Outer Continental Shelf leases and onshore sites available to the same refiners. The Minerals Management Service has yet to adopt final regulations harmonizing the court's ruling with applicable statutory requirements, resulting in actions of dubious legality. 75 references.

Zimmerman, J.J.; Bullerdick, K.H.

1984-01-01T23:59:59.000Z

376

Project Aids Development of Legacy Oilfield on Alaska's North Slope |  

Broader source: Energy.gov (indexed) [DOE]

Project Aids Development of Legacy Oilfield on Alaska's North Project Aids Development of Legacy Oilfield on Alaska's North Slope Project Aids Development of Legacy Oilfield on Alaska's North Slope October 18, 2013 - 11:52am Addthis Project Aids Development of Legacy Oilfield on Alaska’s North Slope Quick Facts The National Petroleum Reserve was created by President Warren G, Harding in 1923 when the U.S. Navy was converting from coal to oil. The reserve spans 22 million acres across the western North Slope of Alaska-the largest single unit of public lands in the nation. The 800-mile-long trans-Alaska pipeline carries oil from Prudhoe Bay, on Alaska's North Slope, to Valdez, Alaska, the nearest ice-free port. More than 16 million barrels of oil have traveled through the pipeline since the first barrel flowed in 1977.

377

Project Aids Development of Legacy Oilfield on Alaska's North Slope |  

Broader source: Energy.gov (indexed) [DOE]

Project Aids Development of Legacy Oilfield on Alaska's North Project Aids Development of Legacy Oilfield on Alaska's North Slope Project Aids Development of Legacy Oilfield on Alaska's North Slope October 18, 2013 - 11:52am Addthis Project Aids Development of Legacy Oilfield on Alaska’s North Slope Quick Facts The National Petroleum Reserve was created by President Warren G, Harding in 1923 when the U.S. Navy was converting from coal to oil. The reserve spans 22 million acres across the western North Slope of Alaska-the largest single unit of public lands in the nation. The 800-mile-long trans-Alaska pipeline carries oil from Prudhoe Bay, on Alaska's North Slope, to Valdez, Alaska, the nearest ice-free port. More than 16 million barrels of oil have traveled through the pipeline since the first barrel flowed in 1977.

378

BUSINESS SENSITIVE  

Broader source: Energy.gov (indexed) [DOE]

Chairman, Subcommittee on Energy Chairman, Subcommittee on Energy and Water Development and Water Development Committee on Appropriations Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 Subject: Section 311 Notification of Pending Public Announcement of Selection of Applications for Negotiation of Financial Assistance Awards Dear Chairmen Rogers, Inouye, Frelinghuysen and Feinstein: In accordance with Section 311 of P.L. 111-85, no earlier than three full business days from the date of this notification, the Department of Energy intends to announce publicly one or more selections for negotiation of financial assistance award(s) over $1,000,000. This information is market sensitive, predecisional and not public at this time. Accordingly,

379

BUSINESS SENSITIVE  

Broader source: Energy.gov (indexed) [DOE]

013) 013) The Honorable Harold Rogers The Honorable Barbara A. Mikulski Chairman, Committee on Appropriations Chairwoman, Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 The Honorable Rodney P. Frelinghuysen The Honorable Dianne Feinstein Chairman, Subcommittee on Energy Chairman, Subcommittee on Energy and Water Development and Water Development Committee on Appropriations Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 Subject: Section 311 Notification to Make a Non-competitive Financial Assistance Award Dear Chairmen Rogers, Mikulski, Frelinghuysen and Feinstein: No earlier than three full business days from the date of this notification, the Department of

380

BUSINESS SENSITIVE  

Broader source: Energy.gov (indexed) [DOE]

013) 013) The Honorable Harold Rogers The Honorable Barbara A. Mikulski Chairman, Committee on Appropriations Chairwoman, Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 The Honorable Rodney P. Frelinghuysen The Honorable Dianne Feinstein Chairman, Subcommittee on Energy Chairman, Subcommittee on Energy and Water Development and Water Development Committee on Appropriations Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 Subject: Section 311 Notification to Make a Non-competitive Financial Assistance Award Dear Chairmen Rogers, Mikulski, Frelinghuysen and Feinstein: No earlier than three full business days from the date of this notification, the Department of

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

BUSINESS SENSITIVE  

Broader source: Energy.gov (indexed) [DOE]

Chairman, Subcommittee on Energy Chairman, Subcommittee on Energy and Water Development and Water Development Committee on Appropriations Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 Subject: Section 311 Notification to Make a Non-competitive Financial Assistance Award Dear Chairmen Rogers, Inouye, Frelinghuysen and Feinstein: No earlier than three full business days from the date of this notification, the Department of Energy intends to award an action over $1,000,000 in accordance with Section 311 of P.L. 111-85. This information is market sensitive, predecisional and not public at this time. Accordingly, we request that you do not further disseminate this information. If you are considering

382

BUSINESS SENSITIVE  

Broader source: Energy.gov (indexed) [DOE]

Chairman, Subcommittee on Energy Chairman, Subcommittee on Energy and Water Development and Water Development Committee on Appropriations Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 Subject: Section 311 Notification of Pending Public Announcement of Selection of Applications for Negotiation of Financial Assistance Awards Dear Chairmen Rogers, Mikulski, Simpson and Feinstein: In accordance with Section 311 of P.L. 112-74 and as continued in P.L. 113-6, no earlier than three full business days from the date of this notification, the Department of Energy intends to announce publicly one or more selections for negotiation of financial assistance award(s) over

383

BUSINESS SENSITIVE  

Broader source: Energy.gov (indexed) [DOE]

10, 2014) 10, 2014) The Honorable Harold Rogers The Honorable Barbara A. Mikulski Chairman, Committee on Appropriations Chairwoman, Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 The Honorable Mike Simpson The Honorable Dianne Feinstein Chairman, Subcommittee on Energy Chairman, Subcommittee on Energy and Water Development and Water Development Committee on Appropriations Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 Subject: Section 311 Notification to Make a Non-competitive Financial Assistance Award Dear Chairmen Rogers, Mikulski, Simpson and Feinstein: No earlier than three full business days from the date of this notification, the Department of

384

BUSINESS SENSITIVE  

Broader source: Energy.gov (indexed) [DOE]

013) 013) The Honorable Harold Rogers The Honorable Barbara A. Mikulski Chairman, Committee on Appropriations Chairwoman, Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 The Honorable Rodney P. Frelinghuysen The Honorable Dianne Feinstein Chairman, Subcommittee on Energy Chairman, Subcommittee on Energy and Water Development and Water Development Committee on Appropriations Committee on Appropriations U.S. House of Representatives U.S. Senate Washington, DC 20515 Washington, DC 20510 Subject: Section 311 Notification to Make a Non-competitive Financial Assistance Award Dear Chairmen Rogers, Mikulski, Frelinghuysen and Feinstein: No earlier than three full business days from the date of this notification, the Department of

385

Visiting With Santa Fe Small Business Owners | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Visiting With Santa Fe Small Business Owners Visiting With Santa Fe Small Business Owners Visiting With Santa Fe Small Business Owners May 10, 2012 - 9:02am Addthis Dot Harris Dot Harris The Honorable Dot Harris, Director, Office of Economic Impact and Diversity You've got to do your homework in order to contract with the federal government. Whether you are a large or small business owner, learning the ins and outs of government contracting takes dedication, perseverance, and taking advantage of opportunities to meet face-to-face with procurement experts and other businesses. That's where our Small Business Roundtables, Business Opportunity Sessions, conference booths, and Regional Small Business Summits come in. We want to meet directly with small business owners, managers, and staffers, to hear what you need to learn from us to make the contracting

386

Small Business - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home Prime Contracts Current Solicitations Small Business Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives Small Business Email Email Page...

387

Seven Small Businesses Awarded Contracts by the Office of Environmental  

Broader source: Energy.gov (indexed) [DOE]

Seven Small Businesses Awarded Contracts by the Office of Seven Small Businesses Awarded Contracts by the Office of Environmental Management Seven Small Businesses Awarded Contracts by the Office of Environmental Management June 19, 2012 - 2:45pm Addthis Large nuclear material processing tanks, like the one destined for Savannah River Site's (SRS) Salt Waste Processing Facility, will be managed with the support of qualified small businesses. Large nuclear material processing tanks, like the one destined for Savannah River Site's (SRS) Salt Waste Processing Facility, will be managed with the support of qualified small businesses. Dot Harris Dot Harris The Honorable Dot Harris, Director, Office of Economic Impact and Diversity Today the Energy Department announced contract awards to seven small-disadvantaged businesses to perform critical technical

388

Seven Small Businesses Awarded Contracts by the Office of Environmental  

Broader source: Energy.gov (indexed) [DOE]

Seven Small Businesses Awarded Contracts by the Office of Seven Small Businesses Awarded Contracts by the Office of Environmental Management Seven Small Businesses Awarded Contracts by the Office of Environmental Management June 19, 2012 - 2:45pm Addthis Large nuclear material processing tanks, like the one destined for Savannah River Site's (SRS) Salt Waste Processing Facility, will be managed with the support of qualified small businesses. Large nuclear material processing tanks, like the one destined for Savannah River Site's (SRS) Salt Waste Processing Facility, will be managed with the support of qualified small businesses. Dot Harris Dot Harris The Honorable Dot Harris, Director, Office of Economic Impact and Diversity Today the Energy Department announced contract awards to seven small-disadvantaged businesses to perform critical technical

389

Home-based business resources | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home-based business resources Home-based business resources Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

390

DOE - Office of Legacy Management -- Rock Island Arsenal - IL 09  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Rock Island Arsenal - IL 09 Rock Island Arsenal - IL 09 FUSRAP Considered Sites Site: ROCK ISLAND ARSENAL ( IL.09 ) Eliminated from consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Rock Island , Illinois IL.09-1 Evaluation Year: 1987 IL.09-2 Site Operations: Site located on a DOD facility and operated under AEC control. Exact nature or time period of operations not clear. No indication that radioactive materials were involved. Contract work with Albuquerque Operations office performed. IL.09-1 IL.09-2 Site Disposition: Eliminated - No Authority - Referred to DOD IL.09-2 Radioactive Materials Handled: None Indicated IL.09-2 Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): None Indicated

391

DOE - Office of Legacy Management -- Seneca Army Depot - NY 11  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seneca Army Depot - NY 11 Seneca Army Depot - NY 11 FUSRAP Considered Sites Site: SENECA ARMY DEPOT (NY.11 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Romulus , New York Evaluation Year: 1985 NY.11-2 NY.11-3 Site Operations: Eleven bunkers were used to store approximately 2,000 drums of pitchblende ore in the early 1940's. The bunkers were returned to munitions storage service after removal of the ore drums. NY.11-4 Site Disposition: Eliminated - Referred to The Department of the Army NY.11-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Pitchblende Ore NY.11-3 Radiological Survey(s): Yes NY.11-5 Site Status: Eliminated from consideration under FUSRAP NY.11-2 Also see Documents Related to SENECA ARMY DEPOT

392

DOE - Office of Legacy Management -- Radiation Applications Inc - NY 57  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Radiation Applications Inc - NY 57 Radiation Applications Inc - NY 57 FUSRAP Considered Sites Site: RADIATION APPLICATIONS, INC. ( NY.57 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: RAI NY.57-1 Location: 370 Lexington Avenue , New York , New York NY.57-3 Evaluation Year: 1991 NY.57-4 Site Operations: Developed foam separation techniques and proposed investigations to remove cesium and strontium from fission product waste solutions. No indication that a substantial quantity of radioactive material was involved. NY.57-3 NY.57-5 Site Disposition: Eliminated - Potential for contamination considered remote NY.57-4 Radioactive Materials Handled: None Indicated NY.57-1 Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): None Indicated

393

DOE - Office of Legacy Management -- Precision Extrusion Co - IL 20  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Precision Extrusion Co - IL 20 Precision Extrusion Co - IL 20 FUSRAP Considered Sites Site: PRECISION EXTRUSION CO. (IL.20) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 720 East Green Avenue , Bensenville , Illinois IL.20-1 Evaluation Year: 1987 IL.20-2 Site Operations: 1956-1959, metal fabrication - extruded uranium billets. IL.20-1 Site Disposition: Eliminated - Potential for contamination considered remote based on limited quantities of materials handled at the site IL.20-2 Radioactive Materials Handled: Yes IL.20-1 Primary Radioactive Materials Handled: Uranium IL.20-1 Radiological Survey(s): Yes IL.20-3 Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to PRECISION EXTRUSION CO.

394

DOE - Office of Legacy Management -- Princeton University - NJ 08  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Princeton University - NJ 08 Princeton University - NJ 08 FUSRAP Considered Sites Site: PRINCETON UNIVERSITY (NJ.08) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Princeton , New Jersey NJ.08-1 Evaluation Year: 1985 NJ.08-2 Site Operations: During 1940's, performed experiments on uranium isotope separation and experiments for the development of diffusion barrier material for the gaseous diffusion enrichment process. NJ.08-2 Site Disposition: Eliminated - Radiation levels below criteria NJ.08-1 NJ.08-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NJ.08-2 NJ.08-3 Radiological Survey(s): Yes NJ.08-1 NJ.08-4 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to PRINCETON UNIVERSITY

395

DOE - Office of Legacy Management -- Seymour_FUSRAP  

Office of Legacy Management (LM)

Connecticut Connecticut Seymour, Connecticut, Site FUSRAP Site Seymour Map Background-The Seymour, Connecticut, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-Research and development of a natural uranium metal extrusion process was performed at the Seymour Site for AEC from 1962 to 1964. Operations resulted in contamination of interior surfaces of one building and two soil areas. DOE designated the site for remediation under FUSRAP in 1985 and conducted remediation in 1992 and 1993. In 1994, DOE certified that the site complied with applicable cleanup criteria and released the property for unrestricted

396

DOE - Office of Legacy Management -- Gardinier Inc - FL 05  

Office of Legacy Management (LM)

Gardinier Inc - FL 05 Gardinier Inc - FL 05 FUSRAP Considered Sites Site: GARDINIER, INC. ( FL.05 ) Eliminated from consideration under FUSRAP - Referred to EPA and State of Florida Designated Name: Not Designated Alternate Name: U. S. Phosphoric Products FL.05-1 Location: Tampa , Florida FL.05-2 Evaluation Year: 1984 FL.05-3 Site Operations: U. S. Phosphoric Products constructed and operated a small scale pilot plant for uranium recovery; and Gardinier investigated a process for the recovery of by-product uranium from wet process phosphoric acid. FL.05-1 FL.05-6 FL.05-7 Site Disposition: Eliminated - No Authority FL.05-3 FL.05-8 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium FL.05-6 FL.05-7 Radiological Survey(s): Yes FL.05-2

397

DOE - Office of Legacy Management -- Wayne Site - NJ 16  

Office of Legacy Management (LM)

Wayne Site - NJ 16 Wayne Site - NJ 16 FUSRAP Considered Sites Wayne, NJ Alternate Name(s): Wayne Interim Storage Site (WISS) W.R. Grace and Company W.R. Grace Site Rare Earths, Inc. Davison Chemical Division NJ.16-1 NJ.16-2 NJ.16-3 Location: 868 Black Oak Road, Wayne, New Jersey NJ.16-5 Historical Operations: Produced crude thorium hydroxide and rare earth elements from monazite sands. Site was also used for interim storage of contaminated material removed from vicinity properties under FUSRAP. NJ.16-5 Eligibility Determination: Eligible NJ.16-1 NJ.16-11 Radiological Survey(s): Assessment Surveys NJ.16-3 NJ.16-6 NJ.16-7 NJ.16-8 NJ.16-9 Site Status: USACE cleanup complete, not yet delisted from the National Priorities List. USACE Website EPA Website Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP

398

DOE - Office of Legacy Management -- Lost Creek - WY 01  

Office of Legacy Management (LM)

Lost Creek - WY 01 Lost Creek - WY 01 FUSRAP Considered Sites Site: Lost Creek (WY.01 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC operations. Reviews of contact lists, accountable station lists, health and safety records and other documentation of the period do not provide sufficient information to warrant further search of historical records for information on these sites. These site files remain "open" to

399

DOE - Office of Legacy Management -- Osborne Co - OH 34  

Office of Legacy Management (LM)

Osborne Co - OH 34 Osborne Co - OH 34 FUSRAP Considered Sites Site: OSBORNE CO. ( OH.34 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Cleveland , Ohio OH.34-1 Evaluation Year: 1987 OH.34-1 Site Operations: Metal Fabrication Operations - Research/Development and Testing - Uranium Metal. OH.34-1 Site Disposition: Eliminated - Limited scope of activities performed - potential for contamination considered remote OH.34-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium OH.34-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to OSBORNE CO. OH.34-1 - Memorandum/Checklist; A. Wallo to the File; Subject:

400

DOE - Office of Legacy Management -- Dur_P  

Office of Legacy Management (LM)

Processing Site Processing Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. Status of Pending Decision Documents Groundwater Compliance Action Plan Under review by U.S. Nuclear Regulatory Commission All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Data Validation Report Environmental Assessment Verification Monitoring Reports Fact Sheet Durango, Colorado, Processing Site Fact Sheet December 15, 2011 Data Validation Package September 2012 Surface Water Sampling at the Durango, Colorado, Processing Site LMS/DUP/S00912 December 2012

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

DOE - Office of Legacy Management -- Buflovak Co - NY 56  

Office of Legacy Management (LM)

Buflovak Co - NY 56 Buflovak Co - NY 56 FUSRAP Considered Sites Site: Buflovak Co. (NY.56 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 1543 Fillmore Ave. , Buffalo , New York NY.56-1 Evaluation Year: 1991 NY.56-2 Site Operations: Research and testing with uranium raffinate. NY.56-1 Site Disposition: Eliminated - Possibility for contamination considered remote due to scope of tests conducted and indication of cleanup operations after tests NY.56-1 NY.56-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium Raffinate NY.56-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to Buflovak Co.

402

DOE - Office of Legacy Management -- Lake_P  

Office of Legacy Management (LM)

Processing Site Processing Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Groundwater Compliance Action Plan Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Data Validation Package Groundwater Compliance Action Plan Fact Sheet Lakeview, Oregon, Processing and Disposal Sites Fact Sheet December 15, 2011 Data Validation Package May 2012 Groundwater Sampling at the Lakeview, Oregon, Processing Site LMS/LKP/S00512 August 2012 May 2010 Groundwater Sampling at the Lakeview, Oregon, Processing Site LMS/LKP/S0510 May 2010

403

DOE - Office of Legacy Management -- Gen_Atomics  

Office of Legacy Management (LM)

General Atomics Hot Cell Facility, California, Site General Atomics Hot Cell Facility, California, Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents General Atomics Hot Cell Facility, California, Site Fact Sheet Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Environmental Assessment Other Documents Fact Sheet General Atomics Hot Cell Facility, California, Site Fact Sheet December 12, 2011 Environmental Assessment Final Environmental Assessment for Decontaminating and Decommissioning the General Atomics Hot Cell Facility DOE/EA-1053 August 1995 Other Documents

404

DOE - Office of Legacy Management -- Springdale PA - PA 11  

Office of Legacy Management (LM)

Springdale PA - PA 11 Springdale PA - PA 11 FUSRAP Considered Sites Springdale, PA Alternate Name(s): C.H. Schnoor - Misspelling of Schnorr from historical documents Conviber, Inc. Premier Manufacturing Company Unity Railway Supply Company PA.11-1 PA.11-2 PA.11-4 PA.11-9 Location: 644 Garfield Street, Springdale, Pennsylvania PA.11-2 Historical Operations: Machined extruded uranium for the Hanford Pile Project to produce an alternate charge for the Hanford reactor and machined uranium slugs for MED contractors. PA.11-9 Eligibility Determination: Eligible PA.11-4 PA.11-5 Radiological Survey(s): Assessment Surveys, Verification Surveys PA.11-4 PA.11-6 PA.11-7 PA.11-8 Site Status: Certified - Cleanup completed - Certification Basis, Federal Register Notice Included PA.11-9

405

DOE - Office of Legacy Management -- Electro Circuits Inc - CA 08  

Office of Legacy Management (LM)

Electro Circuits Inc - CA 08 Electro Circuits Inc - CA 08 FUSRAP Considered Sites Site: Electro Circuits, Inc. (CA.08 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 401 East Green Street , Pasadena , California CA.08-1 Evaluation Year: 1994 CA.08-2 Site Operations: Conducted ultrasonic tests on uranium ingots in the early 1950s. CA.08-3 CA.08-4 Site Disposition: Eliminated - Potential for contamination remote based on limited operations at the site CA.08-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium Metal CA.08-3 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Electro Circuits, Inc. CA.08-1 - AEC Memorandum; Parsegian to Musser; Subject: Transfer of

406

DOE - Office of Legacy Management -- Sylvania Corning Plant - NY 19  

Office of Legacy Management (LM)

Plant - NY 19 Plant - NY 19 FUSRAP Considered Sites Sylvania-Corning, NY Alternate Name(s): Sylvania Electric Products, Inc. Sylvania Corp. NY.19-1 NY.19-4 Location: Cantiaque Road, Hicksville, Long Island, New York NY.19-5 Historical Operations: Pilot-scale production of powdered metal uranium slugs for AEC's Hanford reactor. NY.19-4 Eligibility Determination: Eligible Radiological Survey(s): Assessment Survey NY.19-3 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. USACE Website Long-term Care Requirements: To be determined upon completion. Also see Documents Related to Sylvania-Corning, NY Historical documents may contain links which are no longer valid or to outside sources. LM can not attest to the accuracy of information provided by these links. Please see the Leaving LM Website page for more details.

407

DOE - Office of Legacy Management -- St Louis Airport - MO 01  

Office of Legacy Management (LM)

Airport - MO 01 Airport - MO 01 FUSRAP Considered Sites St. Louis Airport, MO Alternate Name(s): Airport Site St. Louis Airport Storage Site (SLAPS) Former Robertson Storage Area Robertson Airport MO.01-1 MO.01-2 Location: Brown Road, Robertson, Missouri MO.01-2 Historical Operations: Stored uranium process residues containing uranium, radium, and thorium for the MED and AEC. MO.01-2 MO.01-3 MO.01-4 Eligibility Determination: Eligible MO.01-1 MO.01-7 Radiological Survey(s): Assessment Surveys MO.01-4 MO.01-5 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. MO.01-6 USACE Website Long-term Care Requirements: To be determined upon completion. Also see Documents Related to St. Louis Airport, MO MO.01-1 - DOE Memorandum; Coffman to LaGrone; Subject: Authorization

408

DOE - Office of Legacy Management -- Lake_D  

Office of Legacy Management (LM)

Disposal Site Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Lakeview, Oregon, Disposal Site Long-Term Surveillance Plan for the Collins Ranch Disposal Site, Lakeview, Oregon February 23, 2000 Page Changes March 25, 1998 Page Changes August 15, 1998 Page Changes Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report Data Validation Package Long-Term Surveillance Plans

409

DOE - Office of Legacy Management -- General Electric Co - Shelbyville - IN  

Office of Legacy Management (LM)

Electric Co - Shelbyville - Electric Co - Shelbyville - IN 07 FUSRAP Considered Sites Site: General Electric Co - Shelbyville (IN.07 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: General Electric Plant IN.07-1 Location: Shelbyville , Indiana IN.07-1 Evaluation Year: 1994 IN.07-2 Site Operations: Compacted approximately 500 pounds of thorium (small pieces) into electrodes on 25 and 26 June, 1956. IN.07-1 Site Disposition: Eliminated - Potential for contamination considered remote due to limited scope of activities conducted at the site IN.07-1 IN.07-2 IN.07-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Thorium IN.07-1 Radiological Survey(s): Yes IN.07-1 Site Status: Eliminated from consideration under FUSRAP

410

DOE - Office of Legacy Management -- Berkeley CA Site - CA 03  

Office of Legacy Management (LM)

Berkeley CA Site - CA 03 Berkeley CA Site - CA 03 FUSRAP Considered Sites Berkeley, CA Alternate Name(s): University of California Gilman Hall, University of California CA.03-1 Location: Gilman Hall, University of California, Berkeley, California CA.03-1 Historical Operations: Performed research and development on the synthesis and production of plutonium, resulting in uranium, plutonium, cesium and americium contamination. CA.03-3 CA.03-5 Eligibility Determination: Eligible CA.03-1 CA.03-2 Radiological Survey(s): Assessment Surveys CA.03-3 CA.03-4 Site Status: Certified- Certification Basis and Certification Statement CA.03-5 CA.03-6 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP Also see Berkeley, CA, Site

411

DOE - Office of Legacy Management -- Bloomfield Tool Co - NJ 21  

Office of Legacy Management (LM)

Bloomfield Tool Co - NJ 21 Bloomfield Tool Co - NJ 21 FUSRAP Considered Sites Site: Bloomfield Tool Co. (NJ.21 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Bloomfield , New Jersey NJ.21-1 Evaluation Year: 1987 NJ.21-2 Site Operations: During a small-scale experiment, uranium slugs were machined. NJ.21-3 Site Disposition: Eliminated - Potential for contamination considered remote due to limited scope and duration of the operations NJ.21-4 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NJ.21-2 NJ.21-3 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Bloomfield Tool Co. NJ.21-1 - AEC Memorandum; Reichard to Files; Visit to Bloomfield

412

DOE - Office of Legacy Management -- Berkeley_FUSRAP  

Office of Legacy Management (LM)

California California Berkeley, California, Site FUSRAP Site Berkeley Map Background-The Berkeley, California, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-Gilman Hall is a four-story building on the campus of the University of California, Berkeley. Floors, wood sills, walls, and baseboards in the building were contaminated by radioactive materials during the 1940s while conducting research on the production and chemical properties of plutonium performed in support of the Manhattan Engineer District and the U.S. Atomic Energy Commission. DOE designated the site for remediation under FUSRAP in 1979. Lawrence

413

U.S. Department of Energy Office of Legacy Management  

Office of Legacy Management (LM)

March 12, 2013 Inspector SM Stoller, Ohio EPA, ODH March 12, 2013 Inspector SM Stoller, Ohio EPA, ODH Area Former Production Area and Waste Pits Area Sub-Area Type of Finding Follow Up No. Location (Use Map Whenever Possible) GPS? Unauthorized Use Disturbance Vegetation Other Description Photo? (File No.) Corrected Maintenance Req'd Cont. Observation 1 North of Bio-wetland NO X Concrete debris X 2 North of Bio-wetland NO X Asphalt debris X 3 North of Bio-wetland NO X Concrete debris X 4 A4B NO X Concrete debris X 5 Main drainage corridor NO X Concrete debris X 6 Main drainage corridor NO X Concrete debris X 7 Main drainage corridor NO X Asphalt debris X 8 CAWWT NO X Concrete X 9 CAWWT NO X Concrete X 10 CAWWT NO X Concrete X

414

DOE - Office of Legacy Management -- American Brass Co - CT 01  

Office of Legacy Management (LM)

Brass Co - CT 01 Brass Co - CT 01 FUSRAP Considered Sites Site: American Brass Co (CT.01 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Anaconda Company Brass Division CT.01-1 Location: 414 Meadow Street , Waterbury , Connecticut CT.01-1 Evaluation Year: 1986 CT.01-2 Site Operations: Limited work with copper clad uranium billets during the 1950s. CT.01-1 Site Disposition: Eliminated - Potential for contamination considered remote based upon the limited scope of activities at the site CT.01-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium CT.01-3 Radiological Survey(s): Yes - health and safety monitoring during operations only CT.01-3 Site Status: Eliminated from consideration under FUSRAP

415

DOE - Office of Legacy Management -- Massachusetts Institute of Technology  

Office of Legacy Management (LM)

Massachusetts Institute of Massachusetts Institute of Technology Hood Building - MA 01 FUSRAP Considered Sites Site: MASSACHUSETTS INSTITUTE OF TECHNOLOGY, HOOD BUILDING (MA.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Cambridge , Massachusetts MA.01-1 Evaluation Year: 1986 MA.01-2 Site Operations: Facility was acquired by the AEC and engaged in research and development activities involving research quantities of uranium, thorium and beryllium and other rare metals. Operations ceased by 1958, and the Hood Building decontaminated and demolished by August 1963. MA.01-2 MA.01-1 Site Disposition: Eliminated - Potential for contamination considered remote due to limited scope of activities and results of previous decontamination efforts MA.01-3

416

DOE - Office of Legacy Management -- Shoal Test Site - NV 03  

Office of Legacy Management (LM)

Shoal Test Site - NV 03 Shoal Test Site - NV 03 FUSRAP Considered Sites Site: SHOAL TEST SITE (NV.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Sand Springs Range NV.03-1 Location: Near U.S. Highway 50 , Fallon , Nevada NV.03-2 Evaluation Year: 1987 NV.03-2 Site Operations: Underground nuclear detonation site. NV.03-1 Site Disposition: Eliminated - Potential for contamination remote NV.03-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: None at the Surface and Fission Fragments Within the Subsurface NV.03-1 Radiological Survey(s): Yes Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to SHOAL TEST SITE NV.03-1 - Report (NVO-1229-105 Part I); Evaluation of the Project

417

DOE - Office of Legacy Management -- Michigan Velsicol Chemical Corp - MI  

Office of Legacy Management (LM)

Michigan Velsicol Chemical Corp - Michigan Velsicol Chemical Corp - MI 03 FUSRAP Considered Sites Site: MICHIGAN [VELSICOL] CHEMICAL CORP. (MI.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Velsicol Chemical Corp. MI.03-1 Location: St. Louis , Michigan MI.03-2 Evaluation Year: Circa 1987 MI.03-3 Site Operations: Rare earth processing facility. MI.03-2 Site Disposition: Eliminated - No Authority - NRC survey MI.03-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Rare Earths MI.03-3 Radiological Survey(s): Yes MI.03-2 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to MICHIGAN [VELSICOL] CHEMICAL CORP. MI.03-1 - DOE Letter; Mott to Farowe; Subject: Velsicol Chemical

418

DOE - Office of Legacy Management -- SiteA  

Office of Legacy Management (LM)

Illinois Illinois Site A/Plot M Decommissioned Reactor Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2013 Inspection and Annual Site Status Report for the Site A/Plot M, Cook County, Illinois Decontamination and Decommissioning Program Site Annual Monitoring Report Environmental Monitoring Program at Site A and Plot M, Palos Forest Preserve, Cook County, Illinois Long-Term Surveillance and Maintenance Plan for Site A/Plot M, Illinois,Decommissioned Reactor Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon

419

DOE - Office of Legacy Management -- Slick_P  

Office of Legacy Management (LM)

Processing Site Processing Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet Data Validation Package-September 2013 Groundwater and Surface Water Sampling Verification Monitoring Report 2013 Update Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. Status of Pending Decision Documents Groundwater Compliance Action Plan Under development All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Data Validation Package Environmental Assessment Verification Monitoring Reports Fact Sheet Slick Rock, Colorado, Processing Sites and Disposal Site Fact Sheet December 9, 2011

420

DOE - Office of Legacy Management -- Reduction Pilot Plant - WV 01  

Office of Legacy Management (LM)

Reduction Pilot Plant - WV 01 Reduction Pilot Plant - WV 01 FUSRAP Considered Sites Site: REDUCTION PILOT PLANT (WV.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: International Nickel Company WV.01-1 Location: Cole Street at Alterizer Ave. , Huntington , West Virginia WV.01-2 Evaluation Year: 1987 WV.01-1 Site Operations: Manufactured powdered Nickel for use at Paducah and Portsmouth gaseous diffusion plants and Nickel plated a small quantity of Uranium slugs. WV.01-2 WV.01-1 Site Disposition: Eliminated - Limited quantities of radioactive material used on the site. Potential for residual radioactive material from AEC operations conducted at the site considered remote - confirmed by radiological survey. WV.01-1 WV.01-3

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

DOE - Office of Legacy Management -- Wright Air Development Center - OH  

Office of Legacy Management (LM)

Wright Air Development Center - OH Wright Air Development Center - OH 0-08 FUSRAP Considered Sites Site: Wright Air Development Center (OH.0-08) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Wright-Patterson AFB , Ohio OH.0-08-1 Evaluation Year: 1987 OH.0-08-2 Site Operations: The Center's Power Plant Laboratory participated in a joint USAF-AEC ANP Program from 1955 to 1957. A kilocurie gamma facility was constructed and operated. The Center operated under several AEC source material licenses during this period. OH.0-08-1 OH.0-08-2 OH.0-08-4 Site Disposition: Eliminated - Referred to DOD OH.0-08-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium OH.0-08-1

422

DOE - Office of Legacy Management -- Chemical Construction Co Linden Pilot  

Office of Legacy Management (LM)

Chemical Construction Co Linden Chemical Construction Co Linden Pilot Plant - NJ 12 FUSRAP Considered Sites Site: Chemical Construction Co., Linden Pilot Plant (NJ.12 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Chemical Construction Corporation Pilot Plant Chemico NJ.12-1 NJ.12-2 Location: Linden , New Jersey NJ.12-3 Evaluation Year: 1987 NJ.12-4 Site Operations: Performed research and development operations under AEC contract to develop a process for recovering uranium, cobalt, nickel, and copper from low grade residues. NJ.12-5 NJ.12-6 NJ.12-7 Site Disposition: Eliminated - Potential for contamination considered remote due to nature and duration of the operations NJ.12-4 NJ.12-8 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NJ.12-6

423

DOE - Office of Legacy Management -- Love Canal - NY 24  

Office of Legacy Management (LM)

Love Canal - NY 24 Love Canal - NY 24 FUSRAP Considered Sites Site: LOVE CANAL (NY.24 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None NY.24-1 Location: Region running from Old Military Road from the 16-acre rectangular piece of land in the southeast corner of Niagara Falls into the Township of Lewiston , Niagara Falls , New York NY.24-3 Evaluation Year: 1987 NY.24-1 Site Operations: Chemical storage and disposal. NY.24-1 NY.24-3 Site Disposition: Eliminated - No residual radioactive material found NY.24-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): Yes NY.24-5 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to LOVE CANAL

424

DOE - Office of Legacy Management -- Philadelphia Navy Yard - PA 08  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Philadelphia Navy Yard - PA 08 Philadelphia Navy Yard - PA 08 FUSRAP Considered Sites Site: PHILADELPHIA NAVY YARD (PA.08) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Philadelphia , Pennsylvania PA.08-1 Evaluation Year: 1987 PA.08-1 Site Operations: Abelson's S-50 thermal diffusion pilot plant was built and operated on this facility in 1944 and large quantities of uranium hexafluoride were processed in 1945. PA.08-1 Site Disposition: Eliminated - Referred to DOD PA.08-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium oxide (hexaflouride) PA.08-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD PA.08-1

425

DOE - Office of Legacy Management -- Granite2_FUSRAP  

Office of Legacy Management (LM)

Illinois Illinois Granite City, Illinois Site FUSRAP Site Granite Map Background-The Granite City Site, located in Granite City, Illinois, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-In the late 1950s and early 1960s, two federal government-owned betatron particle accelerators were used at the Granite City Site to x-ray uranium metal ingots for the U.S. Atomic Energy Commission to check the quality of the metal and to detect metallurgical flaws before fabrication and machining were performed. In 1992, DOE designated the site for remediation under FUSRAP. Several

426

DOE - Office of Legacy Management -- Cornell University Medical College -  

Office of Legacy Management (LM)

Cornell University Medical College Cornell University Medical College - NY 28 FUSRAP Considered Sites Site: CORNELL UNIVERSITY MEDICAL COLLEGE (NY.28 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: Cornell University and Medical College NY.28-1 Location: New York , New York NY.28-1 Evaluation Year: 1987 NY.28-1 Site Operations: Research activities involving small quantities of radioactive materials in a controlled environment. NY.28-1 Site Disposition: Eliminated - Potential for contamination considered remote - Only research quantities of material used NY.28-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Not Specified NY.28-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP

427

DOE - Office of Legacy Management -- Star Cutter Corp - MI 15  

Office of Legacy Management (LM)

Star Cutter Corp - MI 15 Star Cutter Corp - MI 15 FUSRAP Considered Sites Site: STAR CUTTER CORP. (MI.15) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Farmington , Michigan MI.15-1 Evaluation Year: 1991 MI.15-2 Site Operations: Performed a one time uranium slug drilling operation test in 1956. MI.15-3 MI.15-1 Site Disposition: Eliminated - Potential for contamination considered remote based on limited scope and quantity of materials handled MI.15-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium MI.15-1 MI.15-3 Radiological Survey(s): Yes - health and safety monitoring during operations only MI.15-1 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to STAR CUTTER CORP.

428

DOE - Office of Legacy Management -- Maryland Disposal Site - MD 05  

Office of Legacy Management (LM)

Maryland Disposal Site - MD 05 Maryland Disposal Site - MD 05 FUSRAP Considered Sites Site: MARYLAND DISPOSAL SITE (MD.05 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Baltimore - Vicinity , Maryland MD.05-1 Evaluation Year: 1989 MD.05-1 Site Operations: Proposed disposal site - never developed. MD.05-1 Site Disposition: Eliminated Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to MARYLAND DISPOSAL SITE MD.05-1 - Report (DOE/OR/20722-131 Revision 0); Site Plan for the Maryland Disposal Site; April 1989 Historical documents may contain links which are no longer valid or to

429

DOE - Office of Legacy Management -- Staten Island Warehouse - NY 22  

Office of Legacy Management (LM)

Staten Island Warehouse - NY 22 Staten Island Warehouse - NY 22 FUSRAP Considered Sites Staten Island Warehouse, NY Alternate Name(s): Archer-Daniels Midland Company NY.22-3 Location: 2393 Richmond Terrace, Port Richmond, New York NY.22-2 Historical Operations: Stored pitchblende (high-grade uranium ore), which was purchased by the MED for the first atomic bomb. NY.22-3 Eligibility Determination: Eligible Radiological Survey(s): Assessment Survey NY.22-5 Site Status: Referred by DOE, evaluation in progess by U.S. Army Corps of Engineers. USACE Website Long-term Care Requirements: To be determined upon completion. Also see Documents Related to Staten Island Warehouse, NY NY.22-1 - MED Trip Report Summary; Authors: Ruhoff (Corps of Engineers) and Geddes (Stone & Webster); Subject: Trip to New York;

430

DOE - Office of Legacy Management -- Kaiser Aluminum Corp - IL 19  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Kaiser Aluminum Corp - IL 19 Kaiser Aluminum Corp - IL 19 FUSRAP Considered Sites Site: KAISER ALUMINUM CORP. (IL.19 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Dolton , Illinois IL.19-2 Evaluation Year: 1987 IL.19-2 Site Operations: Performed limited duration work extruding uranium billets into three CP-5 fuel elements, circa 1959. IL.19-2 Site Disposition: Eliminated - Potential for contamination considered remote due to limited scope of activities IL.19-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium IL.19-2 Radiological Survey(s): Yes - health and safety monitoring during operations IL.19-4 Site Status: Eliminated from further consideration under FUSRAP

431

DOE - Office of Legacy Management -- Sharples Corp - PA 29  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sharples Corp - PA 29 Sharples Corp - PA 29 FUSRAP Considered Sites Site: SHARPLES CORP. (PA.29 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 201 Spring Garden Street , Philadelphia , Pennsylvania & Philadelphia , Pennsylvania PA.29-2 PA.29-1 Evaluation Year: 1986 PA.29-1 Site Operations: Producer/broker of special chemicals - major MED supplier. PA.29-2 PA.29-3 Site Disposition: Eliminated - No indication that radioactive materials were used on the site PA.29-1 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to SHARPLES CORP. PA.29-1 - Memorandum/Checklist; D. Levine to the File; Subject:

432

DOE - Office of Legacy Management -- Transcontinental Machine and Tool Co -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transcontinental Machine and Tool Transcontinental Machine and Tool Co - US 06 FUSRAP Considered Sites Site: TRANSCONTINENTAL MACHINE AND TOOL CO. (US.06 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Unknown US.06-1 Evaluation Year: 1990 US.06-1 Site Operations: Metal Fabrication operations - Machined Uranium slugs in support of Savannah River program for evaluation of Uranium fabrication methods. US.06-1 Site Disposition: Eliminated - Based on similar AEC/MED machine shops' surveys with low potential for contamination - did not exceed DOE guidelines US.06-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium US.06-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP

433

DOE - Office of Legacy Management -- Los Alamos Underground Med Pipelines -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Los Alamos Underground Med Los Alamos Underground Med Pipelines - NM 02 FUSRAP Considered Sites Site: Los Alamos Underground Med Pipelines ( NM.02 ) Eliminated - Remedial action being performed by the Los Alamos Area Office of the DOE Albuquerque Operations Office Designated Name: Not Designated Alternate Name: Los Alamos County Industrial Waste Lines NM.02-1 Location: Los Alamos , New Mexico NM.02-1 Evaluation Year: 1986 NM.02-1 Site Operations: From 1952 to 1965, underground pipelines or industrial waste lines were used at Los Alamos Scientific Laboratory to transport liquid wastes from Technical Areas 1, 3, 48, and 43 to a chemical waste treatment plant (Technical Area 45). NM.02-1 Site Disposition: Eliminated - Remedial action being performed by another DOE office NM.02-1

434

DOE - Office of Legacy Management -- Colonial Uranium Co - CO 10  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Colonial Uranium Co - CO 10 Colonial Uranium Co - CO 10 FUSRAP Considered Sites Site: Colonial Uranium Co. (CO.10 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Grand Junction , Colorado CO.10-1 Evaluation Year: 1987 CO.10-2 Site Operations: Processed thorium concentrates for commercial market at another site. AEC purchased small quantity (100 lbs) for testing. CO.10-1 Site Disposition: Eliminated - No Authority - Commercial operation CO.10-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Thorium CO.10-1 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Colonial Uranium Co. CO.10-1 - AEC Memorandum; Faulkner to Sapirie; Subject: Testing of

435

DOE - Office of Legacy Management -- WNI Split Rock Site - 043  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Split Rock Site - 043 Split Rock Site - 043 FUSRAP Considered Sites Site: WNI Split Rock Site (043) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The Western Nuclear, Inc. (WNI) Split Rock site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Jeffrey City, Wyoming. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Control Act was passed in 1978. The majority of the milling conducted at these sites was for private sale, but a portion was sold to the U.S. Government. After the owner completes U.S. Nuclear Regulatory Commission license termination, the Department of

436

DOE - Office of Legacy Management -- Springdale PA - PA 11  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Springdale PA - PA 11 Springdale PA - PA 11 FUSRAP Considered Sites Springdale, PA Alternate Name(s): C.H. Schnoor - Misspelling of Schnorr from historical documents Conviber, Inc. Premier Manufacturing Company Unity Railway Supply Company PA.11-1 PA.11-2 PA.11-4 PA.11-9 Location: 644 Garfield Street, Springdale, Pennsylvania PA.11-2 Historical Operations: Machined extruded uranium for the Hanford Pile Project to produce an alternate charge for the Hanford reactor and machined uranium slugs for MED contractors. PA.11-9 Eligibility Determination: Eligible PA.11-4 PA.11-5 Radiological Survey(s): Assessment Surveys, Verification Surveys PA.11-4 PA.11-6 PA.11-7 PA.11-8 Site Status: Certified - Cleanup completed - Certification Basis, Federal Register Notice Included PA.11-9

437

DOE - Office of Legacy Management -- Colonie - NY 06  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Considered Sites > Colonie - NY 06 Considered Sites > Colonie - NY 06 FUSRAP Considered Sites Colonie, NY Alternate Name(s): Colonie Interim Storage Site National Lead Industries NY.06-1 Location: 1130 Central Avenue, Colonie, New York NY.06-1 Historical Operations: Fabricated and processed uranium metal for the AEC, resulting in contamination from thorium and natural, enriched, and depleted uranium. NY.06-1 NY.06-4 NY.06-5 Eligibility Determination: Eligible NY.06-2 NY.06-3 Radiological Survey(s): Assessment Surveys, Verification Surveys NY.06-6 NY.06-7 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. NY.06-8 NY.06-9 NY.06-10 NY.06-11 USACE Website Long-term Care Requirements: To be determined upon completion. Also see Documents Related to Colonie, NY Colonie Site Aerial Photograph

438

DOE - Office of Legacy Management -- Bowen Lab - NJ 33  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bowen Lab - NJ 33 Bowen Lab - NJ 33 FUSRAP Considered Sites Site: Bowen Lab (NJ.33) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Bowen Engineering, Inc. NJ.33-1 Location: North Branch , New Jersey NJ.33-1 Evaluation Year: Circa 1990 NJ.33-2 Site Operations: Test runs of spray calcining of boiled down pitchblende raffinates was conducted on May 15 and 16, 1951. Equipment used was decontaminated on May 17. NJ.33-1 Site Disposition: Eliminated - Potential for contamination considered remote due to the limited quantities of material used and the duration of the tests, and subsequent cleanup of the site following the tests. NJ.33-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NJ.33-1

439

DOE - Office of Legacy Management -- ANC Gas Hills Site - 040  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ANC Gas Hills Site - 040 ANC Gas Hills Site - 040 FUSRAP Considered Sites Site: ANC Gas Hills Site (040) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: The ANC Gas Hills site is a Uranium Mill Tailings Remedial Action (UMTRA) Title II site located in Gas Hills, Wyoming. UMTRA Title II sites are privately owned and operated sites that were active when the Uranium Mill Tailings Radiation Control Act was passed in 1978. The majority of the milling conducted at these sites was for private sale, but a portion was sold to the U.S. Government. After the owner completes U.S. Nuclear Regulatory Commission license termination, the Department of Energy¿s

440

DOE - Office of Legacy Management -- Fairfield OH Site - OH 23  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fairfield OH Site - OH 23 Fairfield OH Site - OH 23 FUSRAP Considered Sites Fairfield, OH Alternate Name(s): Associate Aircraft Tool & Manufacturing, Inc. Associated Aircraft Tool and Manufacturing Company Force Control Industries Former Dixie Machinery OH.23-1 OH.23-2 Location: 3660 Dixie Highway, Fairfield, Ohio OH.23-2 Historical Operations: Produced natural uranium hollow slugs, resulting in uranium metal contamination. OH.23-4 OH.23-5 Eligibility Determination: Eligible OH.23-1 OH.23-2 Radiological Survey(s): Assessment Survey, Verification Survey OH.23-3 OH.23-6 Site Status: Certified - Certification Basis, Federal Register Notice included OH.23-7 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

DOE - Office of Legacy Management -- United Lead Co - NJ 29  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lead Co - NJ 29 Lead Co - NJ 29 FUSRAP Considered Sites Site: United Lead Co. (NJ.29 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC operations. Reviews of contact lists, accountable station lists, health and safety records and other documentation of the period do not provide sufficient information to warrant further search of historical records for information on these sites. These site files remain "open" to

442

DOE - Office of Legacy Management -- R Brew Co - NH 01  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

R Brew Co - NH 01 R Brew Co - NH 01 FUSRAP Considered Sites Site: R. BREW CO. (NH.01 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Concord , New Hampshire NH.01-1 Evaluation Year: 1994 NH.01-2 Site Operations: Conducted vacuum furnace tests using uranium and copper billets. NH.01-1 NH.01-3 Site Disposition: Eliminated - Potential for contamination remote NH.01-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NH.01-1 NH.01-3 Radiological Survey(s): Yes - radiological monitoring during operations NH.01-3 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to R. BREW CO. NH.01-1 - Memorandum/Checklist; Landis to File; Subject: R. Brew

443

DOE - Office of Legacy Management -- ColumbusEast_FUSRAP  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Columbus East, Ohio, Site Columbus East, Ohio, Site FUSRAP Site Columbus East Map Background-The Columbus East Site in Columbus, Ohio, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-At the Columbus East Site uranium metal was heated and extruded into rods for the Manhattan Engineer District, contaminating building surfaces, drains, equipment, exterior soils, and manholes in nearby streets. The owner removed contamination from site facilities and equipment after extrusion activities ceased in 1943. DOE conducted additional remediation of contaminated areas under FUSRAP in 1996. DOE certified that applicable

444

DOE - Office of Legacy Management -- Heyden Chemical Corp - NJ 19  

Office of Legacy Management (LM)

Heyden Chemical Corp - NJ 19 Heyden Chemical Corp - NJ 19 FUSRAP Considered Sites Site: Heyden Chemical Corp. (NJ.19 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: American Cyanamid NJ.19-2 Location: Princeton , New Jersey NJ.19-1 Evaluation Year: 1987 NJ.19-1 Site Operations: Commercial chemical operation. AEC was interested in their process for keeping thorium oxide in suspension. No indication of AEC contractual relationship with Heyden. NJ.19-1 NJ.19-3 Site Disposition: Eliminated - No indication of AEC operations conducted on the site NJ.19-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Thorium Oxide NJ.19-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP

445

DOE - Office of Legacy Management -- Albany_FUSRAP  

Office of Legacy Management (LM)

Oregon Oregon Albany, Oregon, Site FUSRAP Site albany Background-The Albany, Oregon, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Albany Site is owned by the U.S. Bureau of Mines. Metallurgical research was conducted at this site for the U.S. Atomic Energy Commission and the Energy Research and Development Administration from 1948 to 1978. Activities involving radioactive thorium and uranium resulted in contamination of buildings, equipment, and soils. The U.S. Bureau of Mines remediated portions of the site from 1948 to 1978. DOE conducted additional remediation of buildings, equipment, and soils

446

DOE - Office of Legacy Management -- Motch and Merryweather - OH 46  

Office of Legacy Management (LM)

Motch and Merryweather - OH 46 Motch and Merryweather - OH 46 FUSRAP Considered Sites Site: MOTCH AND MERRYWEATHER (OH.46 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Cleveland , Ohio OH.46-1 Evaluation Year: 1987 OH.46-1 Site Operations: Research/Development and Testing of Uranium. OH.46-1 Site Disposition: Eliminated - Limited scope of activities performed - Potential for residual radioactive contamination considered remote OH.46-1 OH.46-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium OH.46-1 Radiological Survey(s): None Indicated - health and safety monitoring during operations only OH.46-1 Site Status: Eliminated from further consideration under FUSRAP Also see

447

DOE - Office of Legacy Management -- Pantex Sewage Reservoir - TX 03  

Office of Legacy Management (LM)

Pantex Sewage Reservoir - TX 03 Pantex Sewage Reservoir - TX 03 FUSRAP Considered Sites Site: Pantex Sewage Reservoir (TX.03 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site is one of a group of 77 FUSRAP considered sites for which few, if any records are available in their respective site files to provide an historical account of past operations and their relationship, if any, with MED/AEC operations. Reviews of contact lists, accountable station lists, health and safety records and other documentation of the period do not provide sufficient information to warrant further search of historical records for information on these sites. These site files remain "open" to

448

DOE - Office of Legacy Management -- Uravan Mill Site - CO 02  

Office of Legacy Management (LM)

Uravan Mill Site - CO 02 Uravan Mill Site - CO 02 FUSRAP Considered Sites Site: Uravan Mill Site (CO.02 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Naturita, Colorado, Processing Site Documents Related to Uravan Mill Site Data Validation Package for the July and October 2008 Water Sampling at the Naturita Processing and Disposal Sites Data Validation Report for the July 2009 Groundwater and Surface Water Sampling at the Naturita, Colorado, Processing Site; LMS/NAP/S00709; October 2009 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Naturita, Colorado,

449

DOE - Office of Legacy Management -- Hooker Chemical Co - NY 05  

Office of Legacy Management (LM)

Hooker Chemical Co - NY 05 Hooker Chemical Co - NY 05 FUSRAP Considered Sites Site: Hooker Chemical Co. (NY.05) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Occidental Chemical Corporation Hooker Electrochemical Corporation NY.05-1 NY.05-2 Location: Niagara Falls , New York NY.05-3 Evaluation Year: 1985 NY.05-1 NY.05-2 Site Operations: Design, engineering, construction, equipping and operation of a plant for the manufacture of Product 45 (xylene hexachloride); MFL (Miller's fluorolubricant); P-45Cl; and recovered P-45Cl2 from residues produced in the manufacture of P-45Cl; used hydrochloric acid (a byproduct of the P-45 Program) in the chemical processing of uranium-bearing slag as a precursor to recovery. NY.05-2 NY.05-4 Site Disposition: Eliminated - Radiation levels below criteria NY.05-1

450

DOE - Office of Legacy Management -- Metcut Research - US 08  

Office of Legacy Management (LM)

Metcut Research - US 08 Metcut Research - US 08 FUSRAP Considered Sites Site: METCUT RESEARCH (US.08 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Unknown Evaluation Year: 1991 US.08-1 Site Operations: Site was visited by Feed Materials Production Center representatives. US.08-2 US.08-3 Site Disposition: Eliminated - No indication of radioactive materials handled at this site US.08-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None US.08-3 Radiological Survey(s): Radiological Survey(s) Conducted? Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to METCUT RESEARCH US.08-1 - DOE Memorandum; Williams to File; Subject: Elimination of

451

DOE - Office of Legacy Management -- Watertown Arsenal - MA 02  

Office of Legacy Management (LM)

Watertown Arsenal - MA 02 Watertown Arsenal - MA 02 FUSRAP Considered Sites Site: WATERTOWN ARSENAL (MA.02 ) Eliminated from consideration under FUSRAP - Referred to EPA, State of Massachusetts, and the NRC Designated Name: Not Designated Alternate Name: None Location: Building Site 421 , Watertown , Massachusetts MA.02-1 Evaluation Year: 1985 MA.02-2 MA.02-3 Site Operations: Building 421 was used in the late 1940's and early 1950's by M.I.T. under Contract #AT (30-1)-956 for work on African Ores, and a modified ion-exchange technique was developed. Activities at Buildings 34, 41 and the GSA Site were conducted under AEC licensed. MA.02-4 MA.02-5 MA.02-6 Site Disposition: Eliminated - No Authority MA.02-6 MA.02-7 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium MA.02-4

452

DOE - Office of Legacy Management -- Coors Porcelain - CO 12  

Office of Legacy Management (LM)

Coors Porcelain - CO 12 Coors Porcelain - CO 12 FUSRAP Considered Sites Site: Coors Porcelain (CO.12) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Coors Ceramics Company CO.12-1 Location: 600 Ninth Street , Golden , Colorado CO.12-1 Evaluation Year: 1995 CO.12-2 Site Operations: Manufactured ceramic insulators in the 1940s and processed uranium fuel in the 1960s. CO.12-3 Site Disposition: Eliminated - No Authority - NRC licensed. Adequate remediation of site conducted by Coors. CO.12-1 CO.12-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium CO.12-4 Radiological Survey(s): Yes CO.12-1 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Coors Porcelain

453

DOE - Office of Legacy Management -- GrnRiv  

Office of Legacy Management (LM)

Utah Utah Green River, Utah, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Green River, Utah, Disposal Site Data Validation Package-June 2013 Groundwater and Surface Water Sampling at the Green River, Utah, Disposal Site Long-Term Surveillance Plan for the Green River, Utah, Disposal Site Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. Status of Pending Decision Documents Groundwater Compliance Action Plan Under review by U.S. Nuclear Regulatory Commission

454

DOE - Office of Legacy Management -- New York University - NY 50  

Office of Legacy Management (LM)

University - NY 50 University - NY 50 FUSRAP Considered Sites Site: NEW YORK UNIVERSITY (NY.50) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New York , New York NY.50-1 Evaluation Year: 1987 NY.50-1 Site Operations: Activities were related to equipment development. Counters and a small quantity of uranium oxide were provided by the AEC for work under contract AT(30-1)-1256. NY.50-2 NY.50-3 NY.50-4 NY.50-1 Site Disposition: Eliminated - Potential for contamination considered remote - Limited quantity of radioactive material used at this site NY.50-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.50-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP

455

DOE - Office of Legacy Management -- Dur_D  

Office of Legacy Management (LM)

Disposal Site Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Durango, Colorado, Disposal Site Long-Term Surveillance Plan for the Durango Disposal Site, Durango, Colorado Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet Annual Inspection Report Data Validation Package Environmental Assessment Long-Term Surveillance Plan Site Observational Work Plan Verification Monitoring Report

456

DOE - Office of Legacy Management -- Tracerlab Inc - MA 11  

Office of Legacy Management (LM)

Tracerlab Inc - MA 11 Tracerlab Inc - MA 11 FUSRAP Considered Sites Site: TRACERLAB, INC. (MA.11 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 130 High Street , Boston , Massachusetts MA.11-1 Evaluation Year: 1987 MA.11-3 Site Operations: Research and development regarding uranium irradiation and cesium blocks during the early 1950s. MA.11-1 MA.11-3 Site Disposition: Eliminated - NRC licensed MA.11-2 MA.11-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Cesium MA.11-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to TRACERLAB, INC. MA.11-1 - Tracerlab Letter; Epple to Mason; Subject: Steps to Secure

457

DOE - Office of Legacy Management -- Syracuse University - NY 29  

Office of Legacy Management (LM)

Syracuse University - NY 29 Syracuse University - NY 29 FUSRAP Considered Sites Site: SYRACUSE UNIVERSITY (NY.29) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Syracuse , New York NY.29-1 Evaluation Year: 1994 NY.29-2 Site Operations: Activities included work with uranium oxide and the precipitation of thorium iodate from homogeneous solution. NY.29-1 NY.29-3 NY.29-4 Site Disposition: Eliminated - Potential for contamination remote NY.29-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium NY.29-3 NY.29-4 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to SYRACUSE UNIVERSITY NY.29-1 - AEC Memorandum; Belmore to Rodden; Request for Uranium

458

DOE - Office of Legacy Management -- Rensslaer Polytechnic Institute - NY  

Office of Legacy Management (LM)

Rensslaer Polytechnic Institute - Rensslaer Polytechnic Institute - NY 18 FUSRAP Considered Sites Site: RENSSLAER POLYTECHNIC INSTITUTE (NY.18 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Troy , New York NY.18-1 Evaluation Year: 1987 NY.18-1 Site Operations: Research activities involving small quantities of radioactive materials in a controlled environment - under AEC license. NY.18-1 Site Disposition: Eliminated - Potential for residual contamination considered remote NY.18-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Not Specified NY.18-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to RENSSLAER POLYTECHNIC INSTITUTE

459

DOE - Office of Legacy Management -- Oakridge_FUSRAP  

Office of Legacy Management (LM)

Tennessee Tennessee Oak Ridge, Tennessee, Warehouses Site FUSRAP Site Oak Ridge Warehouses Map Background-The Oak Ridge Warehouses Site, located in Oak Ridge, Tennessee, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Oak Ridge Warehouses Site was used in the early 1940s by the Manhattan Engineer District to store high-grade uranium ore and ore processing residues. Later, the U.S. Atomic Energy Commission used the site to store equipment for Oak Ridge National Laboratory. In the 1970s, the site was vacated and decontaminated to then-current standards, transferred

460

DOE - Office of Legacy Management -- Heppanstall Co - PA 19  

Office of Legacy Management (LM)

Heppanstall Co - PA 19 Heppanstall Co - PA 19 FUSRAP Considered Sites Site: Heppanstall Co. (PA.19 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: Tippens Inc. PA.19-1 Location: 4620 Hatfield Street , Pittsburgh , Pennsylvania PA.19-4 Evaluation Year: 1987 PA.19-2 Site Operations: Forged approximately 100,000 pounds of uranium during a six month period in 1955. PA.19-1 Site Disposition: Eliminated - Potential for contamination remote. Radiological screening survey results indicate radiation levels well below DOE guidelines. Conditions at site meet applicable requirements - No further investigation of site necessary. PA.19-1 PA.19-4 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium PA.19-3

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

DOE - Office of Legacy Management -- Luckey OH - OH 18  

Office of Legacy Management (LM)

Luckey OH - OH 18 Luckey OH - OH 18 FUSRAP Considered Sites Luckey, OH Alternate Name(s): Brush Beryllium Company - Luckey Beryllium Production Facility Diamond Magnesium Company Brush Wellman Motor Wheel Corporation Site OH.18-4 OH.18-5 OH.18-6 Location: 21200 Luckey Road, Luckey, Ohio OH.18-5 Historical Operations: Purification, fabrication, and production of beryllium material and products. Conducted studies and other work with beryllium, zirconium, and thorium. OH.18-4 OH.18-7 OH.18-8 OH.18-9 OH.18-10 Eligibility Determination: Eligible OH.18-1 OH.18-2 Radiological Survey(s): Assessment Survey OH.18-4 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. OH.18-11 USACE Website Long-term Care Requirements: To be determined upon completion. Also see Luckey FUSRAP Site

462

DOE - Office of Legacy Management -- Gleason Works - NY 55  

Office of Legacy Management (LM)

Gleason Works - NY 55 Gleason Works - NY 55 FUSRAP Considered Sites Site: GLEASON WORKS (NY.55 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Rochester , New York NY.55-1 Evaluation Year: 1994 NY.55-2 Site Operations: Metal fabrication operations - Rolled uranium metal. NY.55-1 Site Disposition: Eliminated - Potential for contamination considered remote NY.55-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NY.55-1 Radiological Survey(s): Health and Safety Monitoring NY.55-1 NY.55-3 Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to GLEASON WORKS NY.55-1 - NLO Report; Klein to Quigley; Trip Report to the Gleason Works, Rochester, New York on October 30 Thru November 10, 1961; December

463

DOE - Office of Legacy Management -- Jessop Steel Co - PA 17  

Office of Legacy Management (LM)

Jessop Steel Co - PA 17 Jessop Steel Co - PA 17 FUSRAP Considered Sites Site: JESSOP STEEL CO. (PA.17 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 500 Green Street , Washington , Pennsylvania PA.17-3 Evaluation Year: 1991 PA.17-1 Site Operations: Metal fabrication for the AEC in the early 1950s. PA.17-1 Site Disposition: Eliminated - Limited quantities of radioactive material handled on site - Potential for residual radioactive contamination is considered remote - Confirmed by radiological survey PA.17-1 PA.17-2 PA.17-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium PA.17-1 Radiological Survey(s): Yes PA.17-3 Site Status: Eliminated from further consideration under FUSRAP

464

DOE - Office of Legacy Management -- Madison_FUSRAP  

Office of Legacy Management (LM)

Illinois Illinois Madison, Illinois, Site FUSRAP Site Madison Map Background-The Madison Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission (AEC) operations. History-During the late 1950s and early 1960s, the Dow Metal Products Division of Dow Chemical Company machined and shaped uranium metal and straightened uranium rods for AEC. Radiological surveys conducted in 1989 identified uranium dust on interior overhead surfaces that exceeded DOE guidelines. The site was designated for remedial action under FUSRAP in 1992. The U.S. Army Corps of Engineers (USACE) completed remediation in

465

DOE - Office of Legacy Management -- Billings Hospital - Small Animal  

Office of Legacy Management (LM)

Billings Hospital - Small Animal Billings Hospital - Small Animal Facility - University of Chicago - IL 01 FUSRAP Considered Sites Site: Billings Hospital, Small Animal Facility, University of Chicago (IL 01) Eliminated from consideration under FUSRAP due to limited scope of activities and 15 day half-life of P-32 Designated Name: Not Designated Alternate Name: Small Animal Facility, U. of Chicago IL.01-1 Location: University of Chicago , Chicago , Illinois IL.01-1 Evaluation Year: 1979 IL.01-1 Site Operations: Nature of operations is not clear. Portions of Billings Hospital were reported to have been used as an animal research facility. IL.01-1 Site Disposition: Eliminated IL.01-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Phosphorus - 32 IL.01-1

466

DOE - Office of Legacy Management -- Marion Mill Site - CO 09  

Office of Legacy Management (LM)

Marion Mill Site - CO 09 Marion Mill Site - CO 09 FUSRAP Considered Sites Site: MARION MILL SITE (CO.09 ) Eliminated from further consideration under FUSRAP - deferred to the State of Colorado for appropriate action. Designated Name: Not Designated Alternate Name: None Location: Sugar Leaf Road , Boulder , Colorado CO.09-1 Evaluation Year: Circa 1983 CO.09-1 Site Operations: Milled and processed thorite and other rare earth ores in 1957 and 1958. Some of the thorium concentrate produced was shipped to Davison Chemical Company for further processing. CO.09-1 CO.09-3 Site Disposition: Eliminated - Site was licensed by AEC and the State of Colorado CO.09-2 CO.09-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Thorium, Natural Uranium, Other Rare Earth Ores CO.09-1

467

DOE - Office of Legacy Management -- Fenn Machinery Co - CT 11  

Office of Legacy Management (LM)

Fenn Machinery Co - CT 11 Fenn Machinery Co - CT 11 FUSRAP Considered Sites Site: Fenn Machinery Co. (CT.11 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New Britain , Connecticut CT.11-1 Evaluation Year: 1987 CT.11-1 Site Operations: Performed short-term tests on small quantities of uranium metal to explore potential for swaging, circa mid-1950 CT.11-1 CT.11-3 Site Disposition: Eliminated - Potential for contamination considered remote due to limited scope of activities and relatively small quantities of radioactive material used CT.11-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium CT.11-3 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP CT.11-2

468

DOE - Office of Legacy Management -- Adrian_FUSRAP  

Office of Legacy Management (LM)

Michigan Michigan Adrian, Michigan, Site FUSRAP Site adrian Background-The Adrian Site in Adrian, Michigan, was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-The Adrian Site was operated by Bridgeport Brass Company in the 1950s. Uranium metal was extruded at the site for use in the fabrication of fuel elements for production reactors. General Motors Corporation remediated radioactive contamination at the site in the 1970s and additional remediation was conducted under FUSRAP in 1995. Final Conditions-Supplemental limits were applied to residual radioactive material left in the piping system, and DOE released the site for use

469

DOE - Office of Legacy Management -- Podbeilniac Corp - IL 22  

Office of Legacy Management (LM)

Podbeilniac Corp - IL 22 Podbeilniac Corp - IL 22 FUSRAP Considered Sites Site: PODBEILNIAC CORP. (IL.22) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Chicago , Illinois IL.22-1 Evaluation Year: 1990 IL.22-2 Site Operations: MED used equipment for a uranium extraction experiment in 1957. IL.22-1 Site Disposition: Eliminated - Potential for contamination considered remote due to limited scope of activities performed at the site IL.22-2 IL.22-3 IL.22-4 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium IL.22-1 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to PODBEILNIAC CORP. IL.22-1 - Report, Ross to Quigley; Trip Report to Podbeilniac Corp.,

470

DOE - Office of Legacy Management -- Beverly_FUSRAP  

Office of Legacy Management (LM)

Massachusetts Massachusetts Beverly, Massachusetts, Site FUSRAP Site Beverly Map Background-The Beverly, Massachusetts, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-From 1942 to 1948, the Metal Hydrides Corporation, which became the Ventron Corporation in 1965, conducted uranium processing operations that converted uranium oxide to uranium metal powder and uranium metal for the Manhattan Engineer District. The Beverly Site was later used by another private company for the purification of thorium compounds. In 1986, DOE designated the site for remediation under FUSRAP. DOE

471

DOE - Office of Legacy Management -- Trinity Test Site - NM 17  

Office of Legacy Management (LM)

Trinity Test Site - NM 17 Trinity Test Site - NM 17 FUSRAP Considered Sites Site: TRINITY TEST SITE (NM.17 ) Eliminated from consideration under FUSRAP - U.S. Army controls site Designated Name: Not Designated Alternate Name: None Location: missile range - 30 miles west of Carrizozo , White Sands , New Mexico NM.17-1 Evaluation Year: 1985 NM.17-1 Site Operations: Detonation of the first atomic bomb occurred at this site. NM.17-1 Site Disposition: Eliminated NM.17-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Fission fragments NM.17-1 Radiological Survey(s): NM.17-1 Site Status: Eliminated from consideration under FUSRAP - U.S. Army controls site NM.17-1 Also see Documents Related to TRINITY TEST SITE NM.17-1 - DOE Memorandum/Checklist; Jones to File; Subject:

472

DOE - Office of Legacy Management -- Maywood Site - NJ 10  

Office of Legacy Management (LM)

Maywood Site - NJ 10 Maywood Site - NJ 10 FUSRAP Considered Sites Maywood, NJ Alternate Name(s): Maywood Chemical Works Maywood Chemical Company Maywood Interim Storage Site (MISS) Stepan Chemical Company NJ.10-2 NJ.10-3 NJ.10-7 NJ.10-11 Location: 100 West Hunter Avenue, Maywood/Rochelle Park, New Jersey NJ.10-4 Historical Operations: Processed monazite sands for extraction of rare earth compounds and mantle-grade thorium nitrates. NJ.10-2 NJ.10-3 NJ.10-4 NJ.10-5 Eligibility Determination: Eligible NJ.10-1 NJ.10-10 Radiological Survey(s): Assessment Surveys NJ.10-6 NJ.10-7 NJ.10-8 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. NJ.10-9 NJ.10-13 USACE FUSRAP Long-term Care Requirements: To be determined upon completion. Also see FUSRAP Maywood Superfund Site

473

DOE - Office of Legacy Management -- MexHat  

Office of Legacy Management (LM)

Utah Utah Mexican Hat, Utah, Disposal Site This Site All Sites All LM Quick Search Key Documents and Links All documents are Adobe Acrobat files. pdf_icon Key Documents Fact Sheet 2012 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites-Mexican Hat, Utah, Disposal Site Communications and Outreach Plan for the Navajo Nation Uranium Mill Tailings Radiation Control Act Sites Long-Term Surveillance Plan for the Mexican Hat, Utah (UMTRCA Title I), Disposal Site San Juan County, Utah Please be green. Do not print these documents unless absolutely necessary. Request a paper copy of any document by submitting a Document Request. All Site Documents All documents are Adobe Acrobat files. pdf_icon Fact Sheet

474

DOE - Office of Legacy Management -- Fansteel Metallurgical Corp - IL 16  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fansteel Metallurgical Corp - IL 16 Fansteel Metallurgical Corp - IL 16 FUSRAP Considered Sites Site: Fansteel Metallurgical Corp. (IL.16 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Chicago , Illinois IL.16-1 Evaluation Year: 1987 IL.16-3 Site Operations: Sole producer and supplier of tantalum and columbium metals to the MED. IL.16-1 IL.16-3 Site Disposition: Eliminated - No radioactive materials handled at this site IL.16-2 IL.16-3 Radioactive Materials Handled: No Primary Radioactive Materials Handled: None IL.16-2 Radiological Survey(s): No Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to Fansteel Metallurgical Corp. IL.16-1 - MED Memorandum; Greninger to the File; Subject: Visit to

475

DOE - Office of Legacy Management -- Bridgeport Brass Co - Havens  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bridgeport Brass Co - Havens Bridgeport Brass Co - Havens Laboratory - CT 06 FUSRAP Considered Sites Site: Bridgeport Brass Co., Havens Laboratory (CT.06) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Havens Plant Havens Laboratory Reactive Metals, Inc. CT.06-1 CT.06-2 Location: 30 Grand Street and Kossuth and Pulaski Streets , Bridgeport , Connecticut CT.06-3 Evaluation Year: 1987 CT.06-4 Site Operations: From 1953 to 1962, conducted research on drawing/extruding uranium and zirconium tube fabrication. CT.06-3 CT.06-5 CT.06-6 CT.06-7 Site Disposition: Eliminated - Radiation levels below criteria CT.06-1 CT.06-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Zirconium CT.06-3 CT.06-5 CT.06-6 CT.06-7

476

Office of Legacy Management Categorical Exclusion Determination Form  

Broader source: Energy.gov (indexed) [DOE]

Install two groundwater monitoring wells at the Bluewater Uranium Mill Tailings Radiation Install two groundwater monitoring wells at the Bluewater Uranium Mill Tailings Radiation Control Act site near Grants, New Mexico. LM # 10-12 Location : Near Grants, New Mexico Proposed Action or Project Description: DO E proposes to install two groundwater monitoring wells- 20(M) and 11 (SG)- on the Bluewater disposal site using a truck-mounted rotary drill rig. The boreholes would extend to depths of 140 to 280 feet below ground surface and would be completed with a polyvinyl chloride casing that has an outside diameter of 4.5 inches . Water and bentonite would be used for the drilling fluid ; if the drilling company requires additives , DOE would require the use of green products . Drill cuttings , which would consist of ground-up native rock with bentonite

477

DOE - Office of Legacy Management -- University of Florida - FL 09  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Florida - FL 09 Florida - FL 09 FUSRAP Considered Sites Site: UNIVERSITY OF FLORIDA (FL.09) Eliminated from consideration under FUSRAP - Referred to NRC Designated Name: Not Designated Alternate Name: None Location: Gainesville , Florida FL.09-1 Evaluation Year: 1995 FL.09-1 Site Operations: Research and development using test quantities of radioactive metal. FL.09-2 Site Disposition: Eliminated - No Authority - NRC licensed FL.09-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Test Quantities of Uranium and Plutonium FL.09-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP - Referred to NRC FL.09-2 Also see Documents Related to UNIVERSITY OF FLORIDA FL.09-1 - DOE Letter; Wagoner to DeLaney; Subject: University of

478

DOE - Office of Legacy Management -- Adrian - MI 01  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Adrian - MI 01 Adrian - MI 01 FUSRAP Considered Sites Adrian, MI Alternate Name(s): Bridgeport Brass Co. Special Metals Extrusion Plant Bridgeport Brass Company General Motors General Motors Company, Adrian MI.01-1 Location: 1450 East Beecher Street, Adrian, Michigan MI.01-3 Historical Operations: Performed uranium extrusion research and development and metal fabrication work for the AEC using uranium, thorium, and plutonium. MI.01-2 Eligibility Determination: Eligible MI.01-1 Radiological Survey(s): Assessment Surveys, Verifcation Surveys MI.01-4 MI.01-5 MI.01-8 Site Status: Certified- Certification Basis, Federal Register Notice included MI.01-6 MI.01-7 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP

479

DOE - Office of Legacy Management -- Sperry Products Inc - CT 07  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sperry Products Inc - CT 07 Sperry Products Inc - CT 07 FUSRAP Considered Sites Site: SPERRY PRODUCTS, INC. (CT.07) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Danbury , Connecticut CT.07-1 Evaluation Year: 1994 CT.07-2 Site Operations: Performed tests involving non-destructive inspection techniques in the 1950s. CT.07-3 Site Disposition: Eliminated - Potential for contamination considered remote based on the limited scope of activities performed at the site CT.07-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium CT.07-3 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to SPERRY PRODUCTS, INC. CT.07-1 - Sperry Products Letter; VanValkenburg to DeRenzis;

480

DOE - Office of Legacy Management -- Titanium Alloys Manufacturing Co Div  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Titanium Alloys Manufacturing Co Titanium Alloys Manufacturing Co Div of National Lead of Ohio - NY 41 FUSRAP Considered Sites Site: TITANIUM ALLOYS MANUFACTURING CO., DIV. OF NATIONAL LEAD OF OHIO (NY.41) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Titanium Alloy Metals Titanium Alloy Manufacturing Division Titanium Alloy Manufacturing (TAM) Division of National Lead Company The Titanium Pigment Co. NL Industries ICD/Niagara NY.41-1 NY.41-2 NY.41-3 Location: Niagara Falls , New York NY.41-1 Evaluation Year: 1993 NY.41-4 Site Operations: Produced commercial grade zirconium tetrachloride; conducted research and development relating to solid metallic hydride moderators; and experimental work relative to the conversion of thorium scrap to anhydrous tetrachloride. NY.41-5

Note: This page contains sample records for the topic "legacy management business" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

DOE - Office of Legacy Management -- Rocky Flats Petition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Petition Petition Rocky Flats Site, Colorado Site-Specific Uranium Standards Petition All documents are Adobe Acrobat files. pdf_icon U.S. Department of Energy's Proponent's Pre-Hearing Statement for Proposed Revisions to Segments 4a, 4b, and 5 of Big Dry Creek (Walnut and Woman Creeks) Regulation #38 (5 CCR 1002-38) Figure 1 Figure 2 Thermal Ionization Mass Spectrometry Uranium Results for November 2008 RFETS Waters Thermal Ionization Mass Spectrometry Uranium Results for September 2008 RFETS Waters Thermal Ionization Mass Spectrometry Uranium Results for October 2007 RFETS Waters Quantitative Evaluation of Mixture Components in RFETS Uranium Isotopic Analyses Proposed Notice Petition for Rulemaking Regarding Site-Specific Uranium Standards Rulemaking Petition Water Monitoring Locations

482

DOE - Office of Legacy Management -- Cheney Disposal Cell - 008  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cheney Disposal Cell - 008 Cheney Disposal Cell - 008 FUSRAP Considered Sites Site: Cheney Disposal Cell (008) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: All of the uranium mill tailings and other residual radioactive materials from the former Grand Junction uranium mill site were disposed of in this dedicated disposal cell. The cell is authorized to remain open until 2003 to accept any additional byproduct materials from Title I UMTRA sites and the Monticello, Utah site; e.g. materials from additional vicinity properties that may be identified. The Department of Energy¿s Grand Junction Office is responsible for Long Term Surveillance and Maintenance

483

DOE - Office of Legacy Management -- American Cyanamid Co - CT 13  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cyanamid Co - CT 13 Cyanamid Co - CT 13 FUSRAP Considered Sites Site: American Cyanamid Co (CT.13 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Stamford , Connecticut CT.13-1 Evaluation Year: 1987 CT.13-1 Site Operations: Produced boron and possibly handled small amounts of refined radioactive source material circa 1940's. Also possibly performed research work on irradiated "J" slugs in 1952 and 1953. CT.13-1 CT.13-3 Site Disposition: Eliminated - Potential for contamination considered remote due to the limited scope of activities involving radioactive material performed at this site CT.13-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium CT.13-1 Radiological Survey(s): No

484

DOE - Office of Legacy Management -- Wesleyan University - CT 12  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wesleyan University - CT 12 Wesleyan University - CT 12 FUSRAP Considered Sites Site: Wesleyan University (CT.12 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Middletown , Connecticut CT.12-1 Evaluation Year: 1995 CT.12-2 Site Operations: Spectrographic research on small quantities of uranium wire (several inches in length) in Physics Department circa late 1950. CT.12-1 Site Disposition: Eliminated - Potential for contamination considered remote due to the limited scope of activities performed CT.12-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium CT.12-1 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Wesleyan University

485

DOE - Office of Legacy Management -- Beryllium Corp - PA 39  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Beryllium Corp - PA 39 Beryllium Corp - PA 39 FUSRAP Considered Sites Site: BERYLLIUM CORP. (PA.39 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: Brush Beryllium PA.39-1 Location: Reading , Pennsylvania PA.39-1 Evaluation Year: 1987 PA.39-1 Site Operations: Production of Beryllium circa late 1940s - 50s. PA.39-1 Site Disposition: Eliminated - No radioactive material handled at this site, only Beryllium PA.39-1 Radioactive Materials Handled: No PA.39-1 Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to BERYLLIUM CORP. PA.39-1 - Memorandum/Checklist; D. Levine to the File; Subject:

486

DOE - Office of Legacy Management -- American Machine and Foundry Co -  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Buffalo - NY 63 Buffalo - NY 63 FUSRAP Considered Sites Site: American Machine and Foundry Co - Buffalo (NY.63 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: AMF NY.63-1 Location: Buffalo , New York NY.63-1 Evaluation Year: 1990 NY.63-1 Site Operations: Design engineering for the development of electrical and mechanical controls. NY.63-1 Site Disposition: Eliminated - Potential for radioactive contamination considered remote. Radioactive material, if any was used at the site, would have been limited to test quantities. NY.63-2 Radioactive Materials Handled: None Indicated - test quantities, if any NY.63-1 Primary Radioactive Materials Handled: None Indicated, But Could Have Included Test Quantities of Finished Uranium Metal NY.63-1

487

DOE - Office of Legacy Management -- Latty Avenue Site - MO 04  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Latty Avenue Site - MO 04 Latty Avenue Site - MO 04 FUSRAP Considered Sites Latty Avenue Site, MO Alternate Name(s): Futura Coatings Futura Chemical Company Facility Hazelwood Interim Storage Site (HISS) Former Cotter Site, Latty Avenue Properties Contemporary Metals Corp. Continental Mining and Milling MO.04-1 MO.04-2 MO.04-5 MO.04-6 MO.06-8 MO.06-11 Location: 9200 Latty Avenue, Hazelwood, Missouri MO.04-1 Historical Operations: Received, stored, and processed uranium residues for the AEC. Storage and processing were licensed by the AEC and NRC and resulted in contamination of uranium and thorium. MO.04-5 MO.04-6 Eligibility Determination: Eligible MO.04-3 MO.04-4 Radiological Survey(s): Assessment Surveys MO.04-2 MO.04-7 MO.04-8 MO.04-9 MO.04-10 MO.04-11 Site Status: Cleanup in progress by U.S. Army Corps of Engineers. MO.04-12

488

DOE - Office of Legacy Management -- Etna Machine Co - OH 28  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Etna Machine Co - OH 28 Etna Machine Co - OH 28 FUSRAP Considered Sites Site: Etna Machine Co. (OH.28 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 3400 Maplewood Avenue , Toledo , Ohio OH.28-1 Evaluation Year: 1987 OH.28-1 Site Operations: Conducted swaging experiment to reduce the diameter of a hot-rolled uranium metal rod Research/Development and Testing on Uranium Metal in December 1950 (lasted only two days). OH.28-1 Site Disposition: Eliminated - Limited scope of activities performed there - Potential for residual radioactive contamination is considered remote OH.28-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium OH.28-1 Radiological Survey(s): None Indicated

489

DOE - Office of Legacy Management -- Fairfield_FUSRAP  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ohio Ohio Fairfield, Ohio, Site FUSRAP Site Fairfield Map Background-The Fairfield, Ohio, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-In 1956, uranium metal was machined and shaped at the site for the U.S. Atomic Energy Commission, contaminating interior building surfaces, drains, equipment, and soils. The former owner removed some contamination in late 1956. DOE conducted additional remediation at the property under FUSRAP in 1994 and 1995. Supplemental limits were applied to uranium in the soil beneath the building floor slab. DOE certified that applicable cleanup criteria had

490

DOE - Office of Legacy Management -- Swenson Evaporator Co - IL 23  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Swenson Evaporator Co - IL 23 Swenson Evaporator Co - IL 23 FUSRAP Considered Sites Site: SWENSON EVAPORATOR CO. (IL.23 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Harvey , Illinois IL.23-1 Evaluation Year: 1987 IL.23-1 Site Operations: Scheduled a raffinate spray drying test that was later cancelled. IL.23-1 Site Disposition: Eliminated - No indication that radioactive materials were handled at this site IL.23-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see Documents Related to SWENSON EVAPORATOR CO. IL.23-1 - Memorandum/Checklist; D.Levine to the File; Subject:

491

DOE - Office of Legacy Management -- Norfolk Naval Station - VA 05  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Norfolk Naval Station - VA 05 Norfolk Naval Station - VA 05 FUSRAP Considered Sites Site: NORFOLK NAVAL STATION (VA.05) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Norfolk , Virginia VA.05-1 Evaluation Year: 1993 VA.05-1 Site Operations: Demonstration of extinguishing a uranium fire at the Fire Fighters School for AEC contractors. VA.05-3 VA.05-2 Site Disposition: Eliminated - Potential for contamination considered remote based on the limited quantity of materials handled VA.05-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium VA.05-2 Radiological Survey(s): Yes - Health and Safety Monitoring during operations only VA.05-2 Site Status: Eliminated from consideration under FUSRAP

492

DOE - Office of Legacy Management -- Niagara Falls Vicinity Properties NY -  

Office of Legacy Management (LM)

Niagara Falls Vicinity Properties Niagara Falls Vicinity Properties NY - NY 17 FUSRAP Considered Sites Niagara Falls Vicinity Properties, NY Alternate Name(s): Lake Ontario Ordnance Works (LOOW) Niagara Falls Storage Site (NFSS) DOE-Niagara Falls Storage Site NY.17-1 NY.17-3 Location: Lewiston , New York NY.17-5 Historical Operations: Stored, shipped, and buried radioactive equipment and waste for MED and AEC containing uranium, radium, and thorium. Portions of the former site are privately owned, creating a "site" for the vicinity properties. NY.17-1 NY.17-2 NY.17-14 Eligibility Determination: Eligible NY.17-4 Radiological Survey(s): Assessment Surveys, Verification Surveys NY.17-3 NY.17-5 NY.17-6 NY.17-7 NY.17-8 NY.17-9 NY.17-10 NY.17-11 NY.17-12 NY.17-14 Site Status: Certification Basis, including Federal Register Notice for 23 properties. Cleanup in progress for additional 3 VPs. NY.17-13

493

DOE - Office of Legacy Management -- Reynolds Metals Co - VA 04  

Office of Legacy Management (LM)

Reynolds Metals Co - VA 04 Reynolds Metals Co - VA 04 FUSRAP Considered Sites Site: REYNOLDS METALS CO. (VA.04 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Virginia-Carolina Chemical Corporation VA.04-1 Location: 818 Perry Street , Richmond , Virginia VA.04-1 Evaluation Year: 1985 VA.04-2 VA.04-3 Site Operations: Preparatory process development involving only gram quantities of uranium performed in the 1950s. VA.04-1 Site Disposition: Eliminated - Potential for contamination considered remote based on limited materials handled VA.04-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium VA.04-1 Radiological Survey(s): None Indicated VA.04-1 VA.04-4 Site Status: Eliminated from consideration under FUSRAP

494

DOE - Office of Legacy Management -- Iowa State University Ames Laboratory  

Office of Legacy Management (LM)

Iowa State University Ames Iowa State University Ames Laboratory - IA 01 FUSRAP Considered Sites Site: Iowa State University Ames Laboratory (IA.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Wallace Road , Ames , Iowa IA.01-1 IA.01-2 Evaluation Year: Circa 1985 IA.01-3 Site Operations: Produced uranium and thorium metal, recovered uranium scrap, and conducted studies and experimental investigations in connection with chemistry and metallurgy of natural uranium and its allied forms. IA.01-1 IA.01-4 IA.01-5 IA.01-6 IA.01-7 Site Disposition: Eliminated - Referred to Chicago Operations Office for appropriate action IA.01-6 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium IA.01-1

495

DOE - Office of Legacy Management -- Hamilton OH Site - OH 27  

Office of Legacy Management (LM)

Hamilton OH Site - OH 27 Hamilton OH Site - OH 27 FUSRAP Considered Sites Hamilton, OH Alternate Name(s): Herring-Hall-Marvin Safe Company Diebold Incorporated OH.27-2 Location: 1550 Grand Boulevard, Hamilton, Ohio OH.27-2 Historical Operations: Machined uranium metal slugs from rolled stock, under subcontract with National Lead, an MED contractor. OH.27-3 OH.27-4 OH.27-9 Eligibility Determination: Eligible OH.27-1 Radiological Survey(s): Assessment Surveys, Verification Survey OH.27-1 OH.27-5 OH.27-6 OH.27-7 Site Status: Certified - Certification Basis, Federal Register Notice included OH.27-8 Long-term Care Requirements: Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites S07566_FUSRAP Also see Hamilton, OH Site Documents Related to Hamilton, OH

496

DOE - Office of Legacy Management -- Mound Laboratory - OH 19  

Office of Legacy Management (LM)

Mound Laboratory - OH 19 Mound Laboratory - OH 19 FUSRAP Considered Sites Site: Mound Laboratory (OH.19) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: Also see Mound, Ohio, Site Documents Related to Mound Laboratory LEGAL NOTICE for Mound Site 2011 CERCLA Five-Year Review Third Five-Year Review for the Mound, Ohio, Site Miamisburg, Ohio. LMS/MND/S07963. September 2011 5-Year OU-1 Remedy Five-Year Review Report Second Five-Year Review for the Mound, Ohio, Site Miamisburg, Ohio September 2006 Annual Assessment of the Effectiveness of Site-Wide Institutional Controls Applied to the Former DOE Mound Site Property. LMS/MND/S06401.

497

DOE - Office of Legacy Management -- Mobil Oil Corp - VA 01  

Office of Legacy Management (LM)

Mobil Oil Corp - VA 01 Mobil Oil Corp - VA 01 FUSRAP Considered Sites Site: Mobil Oil Corp. (VA.01 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: Virginia-Carolina Chemical Corporation VA.01-1 Location: 818 Perry Street , Richmond , Virginia VA.01-1 Evaluation Year: Circa 1987 VA.01-2 VA.01-3 Site Operations: Research/Development to recover Uranium as a byproduct of phosphate production; preparatory process for pilot plant scale operation at Nichols, Florida. VA.01-1 Site Disposition: Eliminated - Potential for residual radioactive contamination from small quantities of material used at the site is considered remote VA.01-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium VA.01-1

498

DOE - Office of Legacy Management -- Processes Research Inc - OH 44  

Office of Legacy Management (LM)

Processes Research Inc - OH 44 Processes Research Inc - OH 44 FUSRAP Considered Sites Site: PROCESSES RESEARCH, INC (OH.44) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: 2905 Vernon Place , Cincinnati , Ohio OH.44-1 Evaluation Year: 1991 OH.44-2 OH.44-3 Site Operations: Research and development of machining methods during the early 1950s; no indication of involvement with radioactive materials. OH.44-1 OH.44-3 Site Disposition: Eliminated - Potential for contamination considered remote based on nature of operations at the site OH.44-2 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None OH.44-3 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP

499

DOE - Office of Legacy Management -- Hamilton_FUSRAP  

Office of Legacy Management (LM)

Ohio Ohio Hamilton, Ohio, Site FUSRAP Site Hamilton Map Background-The Hamilton, Ohio, Site was remediated under the Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established in 1974 to remediate sites where radioactive contamination remained from Manhattan Project and early U.S. Atomic Energy Commission operations. History-Intermittently from 1943 to 1951, the Herring-Hall-Marvin Safe Company fabricated slugs from rolled natural uranium metal stock for use by the Manhattan Engineer District and the U.S. Atomic Energy Commission in production reactors. In 1994, DOE designated the Hamilton Site for remediation under FUSRAP. DOE remediated areas of contamination identified on surfaces and in floor drains in the interior of the building in 1994 and 1995. DOE certified that

500

DOE - Office of Legacy Management -- Harvard University Electron  

Office of Legacy Management (LM)

Harvard University Electron Harvard University Electron Accelerator - MA 05 FUSRAP Considered Sites Site: Harvard University Electron Accelerator (MA.05 ) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Cambridge , Massachusetts MA.05-1 Evaluation Year: 1987 MA.05-1 Site Operations: Facility performed research in support of AEC and MED utilizing small quantities of radioactive materials in a controlled environment. MA.05-1 Site Disposition: Eliminated - Potential for contamination considered remote based on limited activities at the site MA.05-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Indicated Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP