Powered by Deep Web Technologies
Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Groundwater and Leachate Monitoring and Sampling at ERDF, CY 2009  

SciTech Connect (OSTI)

This document reports the findings of the groundwater and leachate monitoring and sampling at the Environmental restoration Disposal Facility for calendar year 2009. The purpose of this annual monitoring report is to evaluate the conditions of and identify trends for groundwater beneath the ERDF and report leachate results in fulfillment of the requirements specified in the ERDF ROD and the ERDF Amended ROD.

R.L. Weiss, B.L. Lawrence, D.W. Woolery

2010-07-08T23:59:59.000Z

2

Groundwater and Leachate Monitoring and Sampling at ERDF, CY 2008  

SciTech Connect (OSTI)

The purpose of this annual monitoring report is to evaluate the conditions of and identify trends for groundwater beneath the ERDF, to report leachate results in fulfillment of the requirements specified in the ERDF ROD and the ERDF Amended ROD.

R. L. Weiss; D. W. Woolery

2009-09-03T23:59:59.000Z

3

Groundwater and Leachate Monitoring and Sampling at ERDF, CY 2010  

SciTech Connect (OSTI)

The purpose of this annual monitoring report is to evaluate the conditions of and identify trends for groundwater beneath the ERDF and report leachate results in fulfillment of the requirements specified in the ERDF ROD2 and the ERDF Amended ROD (EPA 1999). The overall objective of the groundwater monitoring program is to determine whether ERDF has impacted the groundwater. This objective is complicated by the fact that the ERDF is situated downgradient of the numerous groundwater contamination plumes originating from the 200 West Area.

Weiss, R. L.; Lawrence, B. L.

2011-06-09T23:59:59.000Z

4

Monitoring of Landfill Leachate Dispersion Using Reflectance Spectroscopy and Ground-Penetrating Radar  

Science Journals Connector (OSTI)

Monitoring of Landfill Leachate Dispersion Using Reflectance Spectroscopy and Ground-Penetrating Radar ... The generation and dispersion of leachate from landfills are slow, unsteady, nonuniform, and sometimes discontinuous depending on the degree of compaction of the fill, seasonal changes in the water supply to the system, and changes in the capping and contaminant walls (2). ...

T. Splajt; G. Ferrier; L. E. Frostick

2003-08-12T23:59:59.000Z

5

Environmental Monitoring Plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

6

Environmental monitoring plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

Holland, R.C.

1997-02-01T23:59:59.000Z

7

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

8

Monitoring Plan for Weatherization Assistance Program, State...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Monitoring Plan for Weatherization Assistance...

9

Quality Work Plan Inspection and Monitoring Requirement  

Broader source: Energy.gov [DOE]

Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

10

Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities  

SciTech Connect (OSTI)

This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

Nickels, J.M.

1991-06-01T23:59:59.000Z

11

2002 WIPP Environmental Monitoring Plan  

SciTech Connect (OSTI)

DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

Washington TRU Solutions LLC

2002-09-30T23:59:59.000Z

12

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2012-08-01T23:59:59.000Z

13

Idaho National Laboratory Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Joanne L. Knight

2008-04-01T23:59:59.000Z

14

CESP Tool 9.1: Monitoring Plan Template  

Broader source: Energy.gov [DOE]

CESP Tool 9.1: Monitoring Plan Template from Step 9: Plan to Elevate, Guide to Community Energy Strategic Planning.

15

ICDP Complex Groundwater Monitoring Plan REV 5  

SciTech Connect (OSTI)

This Groundwater Monitoring Plan, along with the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions, constitutes the sampling and analysis plan for groundwater and perched water monitoring at the Idaho CERCLA Disposal Facility (ICDF). A detection monitoring system was installed in the Snake River Plan Aquifer to comply with substantive requirements of "Releases from Solid Waste Management Units" of the Resource Conservation and Recovery Act. This detection monitoring wells constructed in the Snake River Plain Aquifer.

Cahn, L. S.

2007-08-09T23:59:59.000Z

16

Idaho National Laboratory Site Environmental Monitoring Plan  

SciTech Connect (OSTI)

This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Nonroutine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

Jenifer Nordstrom

2014-02-01T23:59:59.000Z

17

Facility effluent monitoring plan for the 3720 facility  

SciTech Connect (OSTI)

This report describes the effluent monitoring plan for the 3720 facility. Airborne and liquid effluents are monitored.

Ballinger, M.Y.

1994-11-01T23:59:59.000Z

18

Monitoring and Evaluation Plan For The  

E-Print Network [OSTI]

,617 acres of wetland habitat and the inundation of 8,900 acres of deep-water marsh. Estimated wildlifeDRAFT Monitoring and Evaluation Plan For The Albeni Falls Wildlife Mitigation Project (BPA Project on vegetation monitoring. Their contributions to this project are greatly appreciated. #12;1 Introduction

19

Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project  

SciTech Connect (OSTI)

Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently.

Hartman, Mary J.; Dresel, P Evan; Lindberg, Jonathan W.; Newcomer, Darrell R.; Thornton, Edward C.

2000-10-18T23:59:59.000Z

20

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not have detrimental effects on the environment. This EMP is to be reviewed annually and updated every three years unless otherwise requested by the DOE or contractor.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2004-02-19T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices  

SciTech Connect (OSTI)

Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

Bechtel Nevada

1998-12-31T23:59:59.000Z

22

Subsurface characterization of groundwater contaminated by landfill leachate using microbial community profile  

E-Print Network [OSTI]

Subsurface characterization of groundwater contaminated by landfill leachate using microbial from groundwater monitoring wells located within and around an aquifer contaminated with landfill. In this landfill leachate application, the weighted SOM assembles the microbial community data from monitoring

Vermont, University of

23

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2008-03-12T23:59:59.000Z

24

Monitored Geologic Repository Test Evaluation Plan  

SciTech Connect (OSTI)

The Monitored Geologic Repository test & evaluation program will specify tests, demonstrations, examinations, and analyses, and describe procedures to conduct and document testing necessary to verify meeting Monitored Geologic Repository requirements for a safe and effective geologic repository for radioactive waste. This test program will provide assurance that the repository is performing as designed, and that the barriers perform as expected; it will also develop supporting documentation to support the licensing process and to demonstrate compliance with codes, standards, and regulations. This comprehensive program addresses all aspects of verification from the development of test requirements to the performance of tests and reporting of the test results. The ''Monitored Geologic Repository Test & Evaluation Plan'' provides a detailed description of the test program approach necessary to achieve the above test program objectives. This test plan incorporates a set of test phases focused on ensuring repository safety and operational readiness and implements a project-wide integrated product management team approach to facilitate test program planning, analysis, and implementation. The following sections provide a description of the individual test phases, the methodology for test program planning and analyses, and the management approach for implementing these activities.

M.B. Skorska

2002-01-02T23:59:59.000Z

25

Clean Slate 1 revegetation and monitoring plan  

SciTech Connect (OSTI)

This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim cleanup of radionuclide-contaminated surface soil at the Clean Slate 1 site (located on the Tonopah Test Range). This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the Double Tracks cleanup site in the fall of 1994 to evaluate the performance of several native plant species and to evaluate different irrigation strategies. Results of that study, and the results from numerous other studies conducted at other sites (Area 11 and Area 19 of the Nevada Test Site), have been summarized and incorporated into this final reclamation plan for the cleanup of the Clean Slate 1 site. The plan also contains procedures for monitoring both short-term and long-term reclamation.

NONE

1996-09-01T23:59:59.000Z

26

Clean Slate 1 revegetation and monitoring plan  

SciTech Connect (OSTI)

This document constitutes a reclamation plan for the short-term and long-term stabilization of land disturbed by activities associated with the cleanup of radionuclide contaminated surface soil at the Clean Slate 1 site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. The results of reclamation trials at Area 11, Area 19 and more recently the reclamation demonstration plots at the Double Tracks cleanup site, have been summarized and incorporated into this reclamation and monitoring plan. The plan also contains procedures for monitoring both the effectiveness and success of short-term and long-term soil stabilization. The Clean Slate 1 site is located on the Tonopah Test Range. The surface soils were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation.

Anderson, D.C.; Hall, D.B.

1997-07-01T23:59:59.000Z

27

Waste Isolation Pilot Plant Environmental Monitoring Plan  

SciTech Connect (OSTI)

DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures, which implement the requirements of this program plan, are also referenced. The DOE regulates its own activities for radiation protection of the public under the authority of the Atomic Energy Act of 1954, as amended (42 U.S.C. 2011). The effluent and environmental monitoring activities prescribed by DOE Order 5400.5 and the DOE/EH-0173T guidance manual are designed to ensure that DOE facilities implement standards and regulations to protect members of the public and the environment against undue risk from radiation. Effluent and environmental monitoring also provide 1999 Environmental Monitoring Plan DOE/WIPP 99-2194 the data necessary to demonstrate compliance with applicable environmental protection regulations. Other federal agencies, such as the U.S. Environmental Protection Agency (EPA), are empowered through specific legislation to regulate certain aspects of DOE activities potentially affecting public health and safety or the environment. Presidential Executive Order 12088, Federal Compliance with Pollution Control Standards (43 FR 47707), requires the heads of executive agencies to ensure that all federal facilities and activities comply with applicable pollution control standards and to take all necessary actions for the prevention, control, and abatement of environmental pollution. Beyond statutory requirements, the DOE has established a general environmental protection policy. The Environmental Policy Statement (issued by then Secretary Herrington on January 8, 1986, and extended on January 7, 1987) describes the DOE's commitment to national environmental protection goals in that it conducts operations ''in an environmentally safe and sound manner . . . in compliance with the letter and spirit of applicable environmental statutes, regulations, and standards'' (DOE, 1986). This Environmental Policy Statement also states the DOE's commitment to ''good environmental management in all of its programs and at all of its facilities in order to correct existing environmental problems, to minimize risks to the environment or public health, and to anticipate and address pote

Westinghouse Electric Company Waste Isolation Division

1999-09-29T23:59:59.000Z

28

Monitoring the execution of temporal plans for robotic systems  

E-Print Network [OSTI]

To achieve robustness in dynamic and uncertain environments, robotic systems must monitor the progress of their plans during execution. This thesis develops a plan executive called Pike that is capable of executing and ...

Levine, Steven James

2012-01-01T23:59:59.000Z

29

Monitoring the Execution of Temporal Plans for Robotic Systems  

E-Print Network [OSTI]

To achieve robustness in dynamic and uncertain environments, robotic systems must monitor the progress of their plans during execution. This thesis develops a plan executive called Pike that is capable of executing and ...

Levine, Steven J.

2012-10-04T23:59:59.000Z

30

Facility effluent monitoring plan for the tank farm facility  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

Crummel, G.M.

1998-05-18T23:59:59.000Z

31

Facility effluent monitoring plan for the Plutonium Uranium Extraction Facility  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan will ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, at a minimum, every 3 years.

Greager, E.M.

1997-12-11T23:59:59.000Z

32

Facility effluent monitoring plan for the 222-S Laboratory  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable Federal, State, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years.

Nickels, J.M.; Warwick, G.J.

1992-11-01T23:59:59.000Z

33

Facility effluent monitoring plan for 242-A evaporator facility  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years.

Crummel, G.M.; Gustavson, R.D.

1995-02-01T23:59:59.000Z

34

Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996  

SciTech Connect (OSTI)

As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

Naidu, J.R.; Paquette, D.; Lee, R. [and others

1996-10-01T23:59:59.000Z

35

Clean Slate 2 Revegetation and Monitoring Plan  

SciTech Connect (OSTI)

This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim clean-up of radionuclide-contaminated surface soil at Clean Slate 2 located northwest of the Nevada Test Site on the Nellis Air Force Range. Surface soils at Clean Slate 2 were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. Excavation of contaminated soils at Clean Slate 2 will follow procedures similar to those used during the cleanup of the Double Tracks and Clean Slate 1 sites. A maximum of approximately 33 cm (12 in) of the surface soils will be excavated and removed from the site. Near ground zero, where contamination levels are highest, approximately 2 m (7 ft) of soil may be removed. The maximum area to be excavated is estimated to be 18.4 hectares (45.4) acres. In addition to the disturbance associated with soil excavation, approximately 2.0 hectares (5.0) acres will be disturbed by the construction of staging areas and placement of support facilities. Short term stabilization consists of an application of a chemical soil stabilizer and long-term stabilizations involves the establishment of a permanent vegetative cover using selective native plant species, site preparation techniques, increasing organic matter and water holding capacity, irrigation to ensure seed germination and plant establishment. The cleanup site will be monitored to ensure success of revegetation and resuspension of soil particles is within established limits.

David Anderson

1998-02-01T23:59:59.000Z

36

Landfill Leachate Control  

Science Journals Connector (OSTI)

Leachate refers to the liquid, contaminated water, that results from the interaction between any water in a landfill, e.g., as the result of rainwater infiltration, and the waste emplaced in the landfill. Lea...

Dr. Haluk Akgn; Jaak J. K. Daemen

2012-01-01T23:59:59.000Z

37

BROOKHAVEN NATIONAL LABORATORY ENVIRONMENTAL MONITORING PLAN  

SciTech Connect (OSTI)

Triennial update that describes the BNL Environmental Monitoring Program for all media (air, surface water, ground water, etc.) in accordance with DOE ORDER 5400.5

DAUM,M.; DORSCH,WM.; FRY,J.; GREEN,T.; LEE,R.; NAIDU,J.; PAQUETTE,D.; SCARPITTA,S.; SCHROEDER,G.

1999-09-22T23:59:59.000Z

38

Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan  

SciTech Connect (OSTI)

This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

Carlson, Thomas J.; Johnson, Gary E.

2010-01-29T23:59:59.000Z

39

PATH PLANNING & MEASUREMENT REGISTRATION FOR ROBOTIC STRUCTURAL ASSET MONITORING  

E-Print Network [OSTI]

that require such a planning strategy include vacuum cleaning robots, painting robots, underwater imagingPATH PLANNING & MEASUREMENT REGISTRATION FOR ROBOTIC STRUCTURAL ASSET MONITORING S.G. Pierce, C s.g.pierce@strath.ac.uk ABSTRACT In recent years, robotic devices have been explored across a wide

Boyer, Edmond

40

Nordic TSOs' Action Plans in enhancing and monitoring Demand Response  

E-Print Network [OSTI]

Nordic TSOs' Action Plans in enhancing and monitoring Demand Response Nordel Market Committee.............................................................................................. 3 2. TSOS' ROLE IN ENHANCING DEMAND RESPONSE.............................. 3 3. ACTIONS TO ENSURE improvment ­ activate the energy efficiency actors 13 5. SYSTEMATIC MONITORING OF REALISED DEMAND RESPONSE 13

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Near Facility Environmental Monitoring Quality Assurance Project Plan  

SciTech Connect (OSTI)

This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards.

MCKINNEY, S.M.

2000-05-01T23:59:59.000Z

42

Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility  

SciTech Connect (OSTI)

The 216-B-3 Pond system was a series of ponds used for disposal of liquid effluent from past Hanford production facilities. In operation from 1945 to 1997, the B Pond System has been a Resource Conservation and Recovery Act (RCRA) facility since 1986, with RCRA interim-status groundwater monitoring in place since 1988. In 1994 the expansion ponds of the facility were clean closed, leaving only the main pond and a portion of the 216-B-3-3 ditch as the currently regulated facility. In 2001, the Washington State Department of Ecology (Ecology) issued a letter providing guidance for a two-year, trial evaluation of an alternate, intrawell statistical approach to contaminant detection monitoring at the B Pond system. This temporary variance was allowed because the standard indicator-parameters evaluation (pH, specific conductance, total organic carbon, and total organic halides) and accompanying interim status statistical approach is ineffective for detecting potential B-Pond-derived contaminants in groundwater, primarily because this method fails to account for variability in the background data and because B Pond leachate is not expected to affect the indicator parameters. In July 2003, the final samples were collected for the two-year variance period. An evaluation of the results of the alternate statistical approach is currently in progress. While Ecology evaluates the efficacy of the alternate approach (and/or until B Pond is incorporated into the Hanford Facility RCRA Permit), the B Pond system will return to contamination-indicator detection monitoring. Total organic carbon and total organic halides were added to the constituent list beginning with the January 2004 samples. Under this plan, the following wells will be monitored for B Pond: 699-42-42B, 699-43-44, 699-43-45, and 699-44-39B. The wells will be sampled semi-annually for the contamination indicator parameters (pH, specific conductance, total organic carbon, and total organic halides) and annually for water quality parameters (chloride, iron, manganese, phenols, sodium, and sulfate). This plan will remain in effect until superseded by another plan or until B Pond is incorporated into the Hanford Facility RCRA Permit.

Barnett, D BRENT.; Smith, Ronald M.; Chou, Charissa J.; McDonald, John P.

2005-11-01T23:59:59.000Z

43

Facility effluent monitoring plan for the 324 Facility  

SciTech Connect (OSTI)

The 324 Facility [Waste Technology Engineering Laboratory] in the 300 Area primarily supports the research and development of radioactive and nonradioactive waste vitrification technologies, biological waste remediation technologies, spent nuclear fuel studies, waste mixing and transport studies, and tritium development programs. All of the above-mentioned programs deal with, and have the potential to, release hazardous and/or radioactive material. The potential for discharge would primarily result from (1) conducting research activities using the hazardous materials, (2) storing radionuclides and hazardous chemicals, and (3) waste accumulation and storage. This report summarizes the airborne and liquid effluents, and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterizing effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

NONE

1994-11-01T23:59:59.000Z

44

Double Tracks revegetation and monitoring plan  

SciTech Connect (OSTI)

This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim clean-up of radionuclide-contaminated surface soil at the Double Tracks site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the site in the fall of 1994 to evaluate the performance of several native species and to evaluate different irrigation strategies. Results of the study at Double Tracks, as well as the results from numerous studies conducted at other sites (Area 11 and Area 19 of the Nevada Test Site), have been summarized and incorporated into this final reclamation plan for the interim cleanup of the Double Tracks site, located northwest of the Nevada Test Site on the Nellis Air Force Range. Surface soils at Double Tracks were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. The total amount of Pu deposited on the site was between 980 and 1,600 grams and was scattered downwind south of the detonation site. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation.

NONE

1997-07-01T23:59:59.000Z

45

SECTION 51 Table of Contents 51 Lake Rufus Woods Research, Monitoring and Evaluation Plan ................2  

E-Print Network [OSTI]

51-1 SECTION 51 ­ Table of Contents 51 Lake Rufus Woods Research, Monitoring and Evaluation Plan ................2 #12;51-2 51 Lake Rufus Woods Research, Monitoring and Evaluation Plan In light of the various is found in Section 2. #12;51-3 Table 51.1. Rufus Woods Subbasin research, monitoring, and evaluation plan

46

Leachate Free Hazardous Waste Landfill  

Science Journals Connector (OSTI)

Experiences of the past few decades have shown that controlling leachate cannot be done by sealing only the landfill bed, but rather by sealing landfill top cover.

Dipl.Ing. Karl Rohrhofer; Dr.Techn. Fariar Kohzad

1990-01-01T23:59:59.000Z

47

Facility effluent monitoring plan for the 325 Facility  

SciTech Connect (OSTI)

The Applied Chemistry Laboratory (325 Facility) houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and mixed hazardous waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials, and a waste treatment facility for processing hazardous, mixed, low-level, and transuranic wastes generated by Pacific Northwest Laboratory. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, particulate, and gas. Some of these materials are also heated during testing which can produce vapors. The research activities have been assigned to the following activity designations: High-Level Hot Cell, Hazardous Waste Treatment Unit, Waste Form Development, Special Testing Projects, Chemical Process Development, Analytical Hot Cell, and Analytical Chemistry. The following summarizes the airborne and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements.

NONE

1998-12-31T23:59:59.000Z

48

BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.  

SciTech Connect (OSTI)

Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

BROOKHAVEN NATIONAL LABORATORY

2003-01-01T23:59:59.000Z

49

TEST PLAN FOR MONITORING COOLING COILS IN A LABORATORY SETTING  

SciTech Connect (OSTI)

The objective of this research project is to understand and quantify the moisture removal performance of cooling coils at part-load conditions. The project will include a comprehensive literature review, detailed measurement of cooling coil performance in a laboratory facility, monitoring cooling systems at several field test sites, and development/validation of engineering models that can be used in energy calculations and building simulations. This document contains the detailed test plan for monitoring cooling coil performance in a laboratory setting. Detailed measurements will be taken on up to 10 direct expansion (DX) and chilled water cooling coils in various configurations to understand the impact of coil geometry and operating conditions on transient moisture condensation and evaporation.

Don B. Shirey, III

2002-04-01T23:59:59.000Z

50

RCRA Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area A-AX at the Hanford Site  

SciTech Connect (OSTI)

This document describes the interim status groundwater monitoring plan for Waste Management Area A-AX.

Narbutovskih, Susan M.; Horton, Duane G.

2001-01-18T23:59:59.000Z

51

Update on Hilo Landfill Leachate TUpdate on Hilo Landfill Leachate TUpdate on Hilo Landfill Leachate TUpdate on Hilo Landfill Leachate TUpdate on Hilo Landfill Leachate Treatment Studyreatment Studyreatment Studyreatment Studyreatment Study continued on p  

E-Print Network [OSTI]

Update on Hilo Landfill Leachate TUpdate on Hilo Landfill Leachate TUpdate on Hilo Landfill Leachate TUpdate on Hilo Landfill Leachate TUpdate on Hilo Landfill Leachate Treatment Studyreatment, the County of Hawaii is considering an expansion of the South Hilo Sanitary Landfill (SHSL

52

Electrochemical treatment of landfill leachate  

Science Journals Connector (OSTI)

Electrochemical methods can offer an elegant contribution towards environmental control as electrons provide a means of removing pollutants by redox reactions. In the process of electrochemical oxidation the main aim has been to convert oxidisable species into carbon dioxide. Leachate originating in landfills is complex wastewater that could exert high environmental impact. This study aims to treat the landfill leachate in order to meet the inland disposal standards. The removal of pollutants was studied with different anode materials in electrochemical process. The treatment of leachate by electrochemical oxidation was carried out in a batch electrolytic parallel plate reactor. The electrochemical process was carried out separately with stainless steel as cathode and anode materials aluminium and titanium/platinum electrodes. The effects of the operating factors such as current density, reaction time, chloride ion concentration, additional electrolyte such as sulphuric acid that influence the removal of pollutant from leachate electrochemically were studied.

C. Ramprasad; A. Navaneetha Gopalakrishnan

2012-01-01T23:59:59.000Z

53

Recirculation of municipal landfill leachate  

E-Print Network [OSTI]

RECIRCULATION OF MUNICIPAL LANDFILL LEACHATE A Thesis by BRIAN JUDE PINKO4ISKI Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May 1987 Major Subject...: Civil Engineering RECIRCULATION OF MUNICIPAL LANDFILL LEACHATE A Thesis by BRIAN JUDE PINKOWSKI Approved as to style and content by: Charles P. Giammona (Chair of Committee) Roy . Harm, (Member) Kirk W. Brown (Member) Donald A. Maxwel...

Pinkowski, Brian Jude

2012-06-07T23:59:59.000Z

54

RPP Computer Automated Surveillance System (CASS) to Tank Monitor and Control System (TMACS) transfer project plan  

SciTech Connect (OSTI)

Management plan to ensure the orderly, systematic transfer of alarms from the retired Computer Automated Surveillance System (CASS) to the Tank Monitor and Control System (TMACS).

SHIPLER, C.E.

1999-07-13T23:59:59.000Z

55

Facility effluent monitoring plan for the Waste Receiving and Processing Facility Module 1  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal state, and local requirements. This facility effluent monitoring plan shall ensure lonq-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years.

Lewis, C.J.

1995-10-01T23:59:59.000Z

56

Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

NONE

1997-11-10T23:59:59.000Z

57

Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)  

SciTech Connect (OSTI)

Plugging and abandonment (P&A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P&A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P&A, the technical methods employed to perform P&A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P&A schedule be maintained. Wells are added to this list by issuance of both a P&A request and a P&A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P&A has been developed and the plan revised to formalize the new business practices.

NONE

1997-05-01T23:59:59.000Z

58

Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years.

DAVIS, W.E.

2000-03-08T23:59:59.000Z

59

NAREL Quality Assurance Project Plan Deployment of Air Monitors to the WIPP Site  

E-Print Network [OSTI]

Requirements for Quality Assurance Project Plans," United States Environmental Protection Agency, OfficeNAREL Quality Assurance Project Plan Deployment of Air Monitors to the WIPP Site Effective Date April 5, 2014 WIPP/QAPP-1 National Analytical Radiation Environmental Laboratory Office of Radiation

60

Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1  

SciTech Connect (OSTI)

This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

Not Available

1994-11-09T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Interim Status Groundwater Monitoring Plan for Low-Level Waste Management Areas 1 to 4, RCRA Facilities, Hanford,Washington  

SciTech Connect (OSTI)

This document describes the monitoring plan to meet the requirements for interim status groundwater monitoring at Hanford Site low-level waste burial grounds as specified by 40 CFR 265, incorporated by reference in WAC 173-303-400. The monitoring will take place at four separate low-level waste management areas in the 200-West and 200-East Areas, in the central part of the site. This plan replaces the previous monitoring plan.

Dresel, P Evan

2004-10-25T23:59:59.000Z

62

Monitoring Plan for RCRA Groundwater Assessment at the 216-U-12 Crib  

SciTech Connect (OSTI)

This document contains a revised and updated monitoring plan for RCRA interim status groundwater assessment, site hydrogeology, and a conceptual model of the RCRA treatment, storage, and disposal unit. Monitoring under interim status is expected to continue until the 216-U-12 crib is incorporated as a chapter into the Hanford Facility RCRA Permit or administratively closed as proposed to EPA and Ecology.

Williams, Bruce A.; Chou, Charissa J.

2005-09-20T23:59:59.000Z

63

SECTION 35 Table of Contents 35 Upper Columbia Research, Monitoring and Evaluation Plan.....................2  

E-Print Network [OSTI]

managers to maintain functional ecosystems for resident fish through protection and restoration of in research, monitoring, and evaluation plan AQUATIC Strategy & Objective Strategy Type 1 Monitoring Type 2 Objective 1B: Assess chemical, biological, and physical factors influencing aquatic productivity. (To allow

64

Characterization of Plutonium in Maxey Flats Radioactive Trench Leachates  

Science Journals Connector (OSTI)

...leachates at the Maxey Flats radioactive waste disposal site exists as dissolved...leachates at the Maxey Flats radioactive waste disposal site exists as dissolved...leachates at the Maxey Flats radioactive waste disposal site exists as dissolved...

JESS M. CLEVELAND; TERRY F. REES

1981-06-26T23:59:59.000Z

65

Municipal landfill leachate treatment by SBBGR technology  

Science Journals Connector (OSTI)

The paper reports the results of a laboratory-scale investigation aimed at evaluating the performance of a periodic biofilter with granular biomass (SBBGR) for treating leachate coming from a mature municipal landfill. The results show that the SBBGR was able to remove roughly 80% of COD in leachate. The remaining 20% of COD were, therefore, presumably owing to the presence in the leachate of recalcitrant compounds. Ammonia removal efficiency was low because of the presence of high salinity and inhibitory compounds in the investigated leachate. The process was characterised by very low sludge production (lower than 0.02 kg TSS/kg CODremoved).

Claudio Di Iaconi; Guido Del Moro; Michele Pagano; Roberto Ramadori

2009-01-01T23:59:59.000Z

66

Idaho National Laboratory (INL) Site Greenhouse Gas (GHG) Monitoring Plan - 40 CFR 98  

SciTech Connect (OSTI)

The purpose of this Greenhouse Gas (GHG) Monitoring Plan is to meet the monitoring plan requirements of Title 40 of the Code of Federal Regulations Part 98.3(g)(5). This GHG Monitoring Plan identifies procedures and methodologies used at the Idaho National Laboratory Site (INL Site) to collect data used for GHG emissions calculations and reporting requirements from stationary combustion and other regulated sources in accordance with 40 CFR 98, Subparts A and other applicable subparts. INL Site Contractors determined subpart applicability through the use of a checklist (Appendix A). Each facility/contractor reviews operations to determine which subparts are applicable and the results are compiled to determine which subparts are applicable to the INL Site. This plan is applicable to the 40 CFR 98-regulated activities managed by the INL Site contractors: Idaho National Laboratory (INL), Idaho Cleanup Project (ICP), Advanced Mixed Waste Treatment Project (AMWTP), and Naval Reactors Facilities (NRF).

Deborah L. Layton; Kimberly Frerichs

2010-07-01T23:59:59.000Z

67

Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities  

E-Print Network [OSTI]

1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

American Society for Testing and Materials. Philadelphia

2010-01-01T23:59:59.000Z

68

Facility Effluent Monitoring Plan for the Spent Nuclear Fuel (SNF) Project  

SciTech Connect (OSTI)

A facility effluent monitoring plan is required by the US. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in Westinghouse Hanford Company (WHC)-EP-0438-1, ''A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans'', and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the third revision to the original annual report. This document is reviewed annually even if there are no operational changes, and it is updated as necessary.

HUNACEK, G.S.

2000-08-01T23:59:59.000Z

69

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan  

SciTech Connect (OSTI)

This document is the third revision of the 'Monitoring Well Inspection and Maintenance Plan' for groundwater wells associated with the US Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. This plan describes the systematic approach for: (1) inspecting the physical condition of monitoring wells at Y-12; (2) identifying maintenance needs that extend the life of the well and assure well-head protection is in place, and (3) identifying wells that no longer meet acceptable monitoring-well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, 'proactive stewardship of the extensive monitoring well network at Y-12' (BWXT 2004a). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality monitoring and hydrologic data are able to be obtained from the well network. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (BWXT 2006b), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data. This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime); (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime); and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of the Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV east of scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bound to the west by a surface drainage feature (Dunaway Branch) and by Scarboro Road to the east. The GWPP maintains an extensive database of construction details and related information for the monitoring wells in each hydrogeologic regime in the 'Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and parts of Bethel Valley on the US DOE Oak Ridge Reservation (BWXT 2003a). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (BWXT 2004a).

None

2006-12-01T23:59:59.000Z

70

Behavior of Engineered Nanoparticles in Landfill Leachate  

Science Journals Connector (OSTI)

This research sought to understand the behavior of engineered nanoparticles in landfill leachate by examining the interactions between nanoparticles and leachate components. The primary foci of this paper are the effects of ZnO, TiO2, and Ag nanoparticles ...

Stephanie C. Bolyard; Debra R. Reinhart; Swadeshmukul Santra

2013-06-25T23:59:59.000Z

71

40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond  

SciTech Connect (OSTI)

This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs.

Chamness, M.A.; Luttrell, S.P.; Dudziak, S.

1989-03-01T23:59:59.000Z

72

Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made.

NONE

1997-09-01T23:59:59.000Z

73

Biological monitoring and abatement program plan for Oak Ridge National Laboratory  

SciTech Connect (OSTI)

The overall purpose of this plan is to evaluate the receiving streams` biological communities for the duration of the permit and meet the objectives for the ORNL BMAP as outlined in the NPDES permit (Appendix). The ORNL BMAP will focus on those streams in the WOC watershed that (1) receive NPDES discharges and (2) have been identified as ecologically impacted. In response to the newly issued NPDES permit, the tasks that are included in this BMAP plan include monitoring biological communities (fish and benthic invertebrates), monitoring mercury contamination in fish and water, monitoring polychlorinated biphenyl (PCB) contamination in fish, and evaluating temperature loading from ORNL outfalls. The ORNL BMAP will evaluate the effects of sediment and oil and grease, as well as the chlorine control strategy through the use of biological community data. Monitoring will be conducted at sites in WOC, First Creek, Fifth Creek, Melton Branch, and WOL.

Kszos, L.A.; Anderson, G.E.; Gregory, S.M.; Peterson, M.J.; Ryon, M.G.; Schilling, E.M.; Smith, J.G.; Southworth, G.R. [Oak Ridge National Lab., TN (United States); Phipps, T.L. [CKY, Inc., Oak Ridge, TN (United States)

1997-06-01T23:59:59.000Z

74

Strategic Plan for Groundwater Monitoring at the Waste Isolation Pilot Plant  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP-03-3230 WIPP-03-3230 Strategic Plan for Groundwater Monitoring at the Waste Isolation Pilot Plant February 2003 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 03-3230 ii DOE/WIPP 03-3230 iii Table of Contents EXECUTIVE SUMMARY ....................................................................................... viii 1. Introduction.................................................................................................... 1 1.1 Overview .................................................................................................. 1 1.2 Historical Perspective .............................................................................. 1 1.2.1 Evolution of the Groundwater-Monitoring Well Network

75

Ground-water monitoring compliance plan for the Hanford Site Solid Waste Landfill  

SciTech Connect (OSTI)

Washington state regulations required that solid waste landfill facilities have ground-water monitoring programs in place by May 27, 1987. This document describes the well locations, installation, characterization studies and sampling and analysis plan to be followed in implementing the ground-water monitoring program at the Hanford Site Solid Waste Landfill (SWL). It is based on Washington Administrative Code WAC 173-304-490. 11 refs., 19 figs., 4 tabs.

Fruland, R.M.

1986-10-01T23:59:59.000Z

76

Sandia National Laboratories, California Quality Assurance Project Plan for Environmental Monitoring Program.  

SciTech Connect (OSTI)

This Quality Assurance Project Plan (QAPP) applies to the Environmental Monitoring Program at the Sandia National Laboratories/California. This QAPP follows DOE Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance (DOE G 414.1-2A June 17, 2005). The Environmental Monitoring Program is located within the Environmental Operations Department. The Environmental Operations Department is responsible for ensuring that SNL/CA operations have minimal impact on the environment. The Department provides guidance to line organizations to help them comply with applicable environmental regulations and DOE orders. To fulfill its mission, the department has groups responsible for waste management; pollution prevention, air quality; environmental planning; hazardous materials management; and environmental monitoring. The Environmental Monitoring Program is responsible for ensuring that SNL/CA complies with all Federal, State, and local regulations and with DOE orders regarding the quality of wastewater and stormwater discharges. The Program monitors these discharges both visually and through effluent sampling. The Program ensures that activities at the SNL/CA site do not negatively impact the quality of surface waters in the vicinity, or those of the San Francisco Bay. The Program verifies that wastewater and stormwater discharges are in compliance with established standards and requirements. The Program is also responsible for compliance with groundwater monitoring, and underground and above ground storage tanks regulatory compliance. The Program prepares numerous reports, plans, permit applications, and other documents that demonstrate compliance.

Holland, Robert C.

2005-09-01T23:59:59.000Z

77

Ion chromatographic analysis of oil shale leachates  

SciTech Connect (OSTI)

In the present work an investigation of the use of ion chromatography to determine environmentally significant anions present in oil shale leachates was undertaken. Nadkarni et al. have used ion chromatography to separate and quantify halogen, sulfur and nitrogen species in oil shales after combustion in a Parr bomb. Potts and Potas used ion chromatography to monitor inorganic ions in cooling tower wastewater from coal gasification. Wallace and coworkers have used ion chromatography to determine anions encountered in retort wastewaters. The ions of interest in this work were the ions of sulfur oxides including sulfite (SO{sub 3}{sup 2{minus}}), sulfate (SO{sub 4}{sup 2{minus}}), thiosulfate (S{sub 2}O{sub 3}{sup 2{minus}}), dithionite (S{sub 2}O{sub 4}{sup 2{minus}}), dithionate (S{sub 2}O{sub 6}{sup 2{minus}}), peroxyodisulfate (S{sub 2}O{sub 8}{sup 2{minus}}), and tetrathionate (S{sub 4}O{sub 6}{sup 2{minus}}), and thiocyanate (SCN{sup {minus}}), sulfide (S{sup 2{minus}}) hydrosulfide (HS{sup {minus}}), cyanide (CN{sup {minus}}), thiocyanate (SCN{sup {minus}}), and cyanate (OCN{sup {minus}}). A literature search was completed and a leaching procedure developed. 15 refs., 6 figs., 1 tab.

Butler, N.L.

1990-10-01T23:59:59.000Z

78

Persistent Ocean Monitoring with Underwater Gliders: Path Plans and Adapting Sampling Resolution 3D/4D  

E-Print Network [OSTI]

, penalized for navigating through waters of large magnitude ocean currents, and is length constrained. AlongPersistent Ocean Monitoring with Underwater Gliders: Path Plans and Adapting Sampling Resolution 3D Abstract Ocean processes are dynamic and complex events that occur on multiple different spatial

Frandsen, Jannette B.

79

Monitored retrievable storage submission to Congress: Volume 3, Monitored retrievable storage program plan. [Contains glossary  

SciTech Connect (OSTI)

This document presents the current DOE program objectives and the strategy for implementing the proposed program for the integral MRS facility. If the MRS proposal is approved by Congress, any needed revisions to the Program Plan will be made available to the Congress, the State of Tennessee, affected Indian tribes, local governments, other federal agencies, and the public. The proposal for constructing an MRS facility must include: the establishment of a federal program for the siting, development, construction, and operation of MRS facilities; a plan for funding the construction and operation of MRS facilities; site-specific designs, specifications, and cost estimates for the first such facility; a plan for integrating MRS facilities with other storage and disposal facilities authorized by the NWPA. 32 refs., 14 figs., 1 tab.

none,

1987-03-01T23:59:59.000Z

80

Landfill Leachate Treatment by Reverse Osmosis  

Science Journals Connector (OSTI)

Leachate from landfill sites represents a highly polluted waste water. It containes biodegradable compounds but also inorganic salts and trace recalcitrant pollutants. The reverse osmosis process with or without ...

B. Weber; F. Holz

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Research plan for integrated ecosystem and pollutant monitoring at remote wilderness study sites  

SciTech Connect (OSTI)

This research plan outlines an approach to the measurement of pollutants and ecosystem parameters at remote, high-elevation, wilderness study sites. A multimedia, systems approach to environmental monitoring is emphasized. The primary purpose of the research is to apply and field test a technical report entitled ''Guidelines for measuring the physical, chemical, and biological condition of wilderness ecosystems.'' This document intended to provide Federal Land Managers with information to establish environmental monitoring programs in wilderness areas. To date, this monitoring document has yet to be evaluated under rigorous field conditions at a remote, high-elevation Rocky Mountain site. For the purpose of field testing approaches to monitoring of pollutants and ecosystems in remote, wilderness areas, evaluation criteria were developed. These include useability, cost-effectiveness, data variability, alternative approaches, ecosystems conceptual approach, and quality assurance. Both the Forest Service and INEL environmental monitoring techniques will be evaluated with these criteria. Another objective of this research plan is to obtain an integrated data base on pollutants and ecosystem structure and function at a remote study site. The methods tested in this project will be used to acquire these data from a systems approach. This includes multimedia monitoring of air and water quality, soils, and forest, stream, and lake ecosystems. 71 refs., 1 fig., 9 tabs.

Bruns, D.A.; Wiersma, G.B.

1988-03-01T23:59:59.000Z

82

Revised ground-water monitoring compliance plan for the 300 area process trenches  

SciTech Connect (OSTI)

This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

1988-09-01T23:59:59.000Z

83

Advanced Metering Plan for Monitoring Energy and Potable Water Use in PNNL EMS4 Buildings  

SciTech Connect (OSTI)

This updated Advanced Metering Plan for monitoring whole building energy use in Pacific Northwest National Laboratory (PNNL) EMS4 buildings on the PNNL campus has been prepared in accordance with the requirements of the Energy Policy Act of 2005 (EPAct 2005), Section 103, U.S. Department of Energy (DOE) Order 430.2B, and Metering Best Practices, A Guide to Achieving Utility Resource Efficiency, Federal Energy Management Program, October 2007 (Sullivan et al. 2007). The initial PNNL plan was developed in July 2007 (Olson 2007), updated in September 2008 (Olson et al. 2008), updated in September 2009 (Olson et al. 2009), and updated again in August 2010 (Olson et al. 2010).

Pope, Jason E.; Olson, Norman J.; Berman, Marc J.; Schielke, Dale R.

2011-08-17T23:59:59.000Z

84

U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan  

Office of Legacy Management (LM)

GWMON 1.12-1 GWMON 1.12-1 U.S. Department of Energy UMTRA Ground Water Project Ground Water Pumping and Monitoring Plan for the Land Farm Pilot Test Monument Valley, Arizona August 2000 Prepared by U.S. Department of Energy Grand Junction Ofice Grand Junction, Colorado Project Number UGW-5 1 1-001 5-21-000 Document Number U0106701 This page intentionally left blank Document Number U0106701 Contents Contents 1.0 Introduction ....................................................................................................................... 1 2.0 Purpose and Scope ........................................................................................................... 1 3.0 Pilot-Test Extraction Wellfield 2 4.0 Water Elevation Measurements and Monitoring ............... 4

85

Liquid Effluent Monitoring Information System test plans releases 2.0 and 3.0  

SciTech Connect (OSTI)

The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user.

Guettler, D.A.

1995-05-26T23:59:59.000Z

86

Site plan safety submission for sampling, monitoring, decontamination of GB agent - north plant Rocky Mountain Arsenal. Volume 1  

SciTech Connect (OSTI)

The scope of this site plan safety submission (SPSS), includes: sampling plan to determine if GB is a contaminant in equipment and piping used in the production and demil processes; monitoring plan for personnel involved in the sampling effort; decon plan for personnel, equipment, and piping should contamination be identified. Additional sections and appendices include: historical use of bldg 1501, 1503, 1504, 1506, 1601, 1602, 1603, 1606; chemical information on GB; safety requirements; medical requirements and first aid procedures; piping drawings; rma sop's for sampling, monitoring, and decon.

Not Available

1988-10-01T23:59:59.000Z

87

Chlorofluorocarbons as tracers of landfill leachate in surface and groundwater  

Science Journals Connector (OSTI)

...considerably lower concentrations in landfill gas. CFCs and CCl4 in leachate may...all groundwater, leachate and landfill gas samples were taken on 6 April 2004...at the central site facility. Landfill gas was sampled by attaching a thick...

A. E. Foley; T. C. Atkinson; Y. Zhao

88

National Marine Pollution Orogram: federal plan for ocean pollution research, development, and monitoring, fiscal years 1988-1992  

SciTech Connect (OSTI)

The National Marine Pollution Program is the composite of all programs funded by the Federal Government that conduct marine pollution research, development, or monitoring activities. In FY 1988, the Federal Government expended an estimated $107.2 million for marine pollution research and monitoring activities. These activities were funded by 11 Federal departments and independent agencies and included studies pertaining to pollution in coastal areas, estuaries, open oceans, and the Great Lakes. The Plan represents the fourth such document in the continuing interagency planning process called for in the National Ocean Pollution Planning Act of 1978 (P.L. 95-273), as amended. As required by the Act, a comprehensive 5-year Plan for the overall Federal effort is prepared and updated every 3 years. The Plan identifies national marine pollution needs and problems, describes the existing Federal capability for conducting marine pollution research and monitoring.

Not Available

1988-09-01T23:59:59.000Z

89

Reverse osmosis module successfully treats landfill leachate  

SciTech Connect (OSTI)

By law, modern landfills are to be constructed with double liners to prevent contaminants from leaching into surface and ground water. Despite this design feature, however, both hazardous and non-hazardous compounds do leach from the waste disposed in landfills. The resulting contaminated water, or leachate, must be collected and treated. Rochem Environmental, Inc. (Houston, Texas) has developed a new membrane process, known as the Disc Tube{trademark} system, to remove a variety of contaminants from landfill leachate. 1 ref., 1 fig., 2 tabs.

NONE

1995-03-01T23:59:59.000Z

90

Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities  

SciTech Connect (OSTI)

The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are referred to as Balance-of-Plant (BOP) facilities. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R and D. R and D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in the FEMP.

Ballinger, M.Y.; Shields, K.D.

1999-04-02T23:59:59.000Z

91

Test plan for preparing the Rapid Transuranic Monitoring Laboratory for field deployment  

SciTech Connect (OSTI)

This plan describes experimental work that will be performed during fiscal year 1994 to prepare the Rapid Transuranic Monitoring Laboratory (RTML) for routine field use by US Department of Energy (DOE) Environmental Restoration and Waste Management programs. The RTML is a mobile, field-deployable laboratory developed at the Idaho National Engineering Laboratory (INEL) that provides a rapid, cost-effective means of characterizing and monitoring radioactive waste remediation sites for low-level radioactive contaminants. Analytical instruments currently installed in the RTML include an extended-range, germanium photon analysis spectrometer with an automatic sample changer; two, large-area, ionization chamber alpha spectrometers; and four alpha continuous air monitors. The RTML was field tested at the INEL during June 1993 in conjunction with the Buried Waste Integrated Demonstration`s remote retrieval demonstration. The major tasks described in this test plan are to (a) evaluate the beta detectors for use in screening soil samples for {sup 90}Sr, (b) upgrade the alpha spectral analysis software programs, and (c) upgrade the photon spectral analysis software programs.

McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

1994-04-01T23:59:59.000Z

92

Addendum to environmental monitoring plan Nevada Test Site and support facilities  

SciTech Connect (OSTI)

This 1992 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/1 0630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1992 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

NONE

1992-11-01T23:59:59.000Z

93

RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1  

SciTech Connect (OSTI)

The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

NONE

1995-09-01T23:59:59.000Z

94

Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex  

SciTech Connect (OSTI)

This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure A.1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and water-quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted ''active'' status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling (Section 3.0), whereas wells granted ''inactive'' status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 3.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 4.0). This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes (Figure A.1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge directly south of Y-12 that is bound on the west by a surface drainage feature (Dunaway Branch) and on the east by Scarboro Road. For this plan, the Chestnut Ridge Regime includes an area known as the South Campus Facility that is located west of Scarboro Road and south of Bethel Valley Road. The GWPP maintains an extensive database of construction details and related information for the monitoring wells in each hydrogeologic regime (including wells that have been destroyed or intentionally plugged and abandoned); the most recent hardcopy version of the database was issued in February 2003 (BWXT Y-12, L.L.C. [BWXT] 2003). This plan does not apply to temporary piezometers or other specialized groundwater monitoring/sampling devices that have been or may be installed for research purposes, hydrologic tests, pilot studies, or short-term investigations. This plan will be reviewed and updated every three years, as specified in the ''Y-12 GWPP Management Plan'' (BWXT 2004). Between scheduled updates of this plan, addenda issued by the GWPP Manager (or authorized designee) will document any substantial changes or modifications to the plan, including changes in the GWPP status designation for each monitoring well identified in the plan. The addenda, numbered in consecutive ascending order, will be forwarded to all personnel included on the distribution list for this plan. The addenda are inserted in Appendix C pending the next scheduled update of the plan, which will incorporate the information included in the addenda.

None

2006-12-01T23:59:59.000Z

95

Performance Assessment Monitoring Plan for the Hanford Site Low-Level Burial Grounds  

SciTech Connect (OSTI)

The U.S. Department of Energy Order 435.1, Radioactive Waste Management, requires a disposal authorization statement authorizing operation (or continued operation) for low-level waste disposal facilities. In fulfillment of these requirements, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area burial grounds and the 200 West Area burial grounds. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area low-level burial grounds be written and approved by the Richland Operations Office. As a result of a record of decision for the Hanford Site Solid Waste Program and acceptance of the Hanford Site Solid Waste Environmental Impact Statement, the use of the low-level burial ground (LLBG) as a disposal facility for low-level and mixed low-level wastes has been restricted to lined trenches and the Navy reactor-compartment trench only. Hence, as of July 2004, only the two lined trenches in burial ground 218-W-5 (trenches 31 and 34, see Appendix A) and the Navy reactor-compartment trench in burial ground 218 E 12B (trench 94) are allowed to receive waste. When the two lined trenches are filled, the LLBG will cease to operate except for reactor compartment disposal at trench 94. Remaining operational lifetime of the LLBG is dependent on waste volume disposal rates. Existing programs for air sampling and analyses and subsidence monitoring are currently adequate for performance assessment at the LLBG. The waste disposal authorization for the Hanford Site is based (in part) on the post-closure performance assessments for the LLBG. In order to maintain a useful link between operational monitoring (e.g., Resource Conservation and Recovery Act [RCRA], Comprehensive Environmental Response, Compensation, and Liability Act, and State Waste Discharge Permits), constituents, monitoring frequencies, and boundaries require regular review and comparison. The annual reports discussed here are the primary sources for these reviews. The pathways of interest are air and groundwater for both operational and post-closure conditions at the LLBG, with groundwater considered to be the most significant long-term exposure pathway. Constituents that contributed at least 0.1% of the total relative hazard were selected as target analytes for monitoring. These are technetium-99, uranium, and iodine-129. Because of its environmental unavailability, carbon 14 was removed from the list of constituents. Given the potential uncertainties in inventories at the 200 Area LLBG and the usefulness of tritium as a contaminant indicator, tritium will be monitored as a constituent of concern at all burial grounds. Preexisting contamination plumes in groundwater beneath low-level waste management areas are attributed to other past-practice liquid waste disposal sites. Groundwater and air will be sampled and analyzed for radiogenic components. Subsidence monitoring will also be performed on a regular basis. The existing near-facility and surveillance air monitoring programs are sufficient to satisfy the performance assessment monitoring. Groundwater monitoring will utilize the existing network of wells at the LLBG, and co-sampling with RCRA groundwater monitoring, to be sampled semiannually. Installation of additional wells is currently underway to replace wells that have gone dry.

None

2006-03-30T23:59:59.000Z

96

Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site  

SciTech Connect (OSTI)

This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site.

Bechtel Nevada

2005-06-01T23:59:59.000Z

97

Acid rain program: CEMS submission instructions for monitoring plans, certification test notifications, and quarterly reports  

SciTech Connect (OSTI)

The Acid Rain Program regulations require all affected utility units to continuously measure, record and report SO2, NOx, volumetric flow data and CO2 emissions. All affected units also must continuously measure and record opacity, and must report opacity exceedances to the appropriate State or Local Agency. To ensure that your CEMS and fuel flowmeters are performing at an acceptable level, and providing quality assured data, you are required under 40 CFR 75.53, 75.62 (a) to submit a monitoring plan and certification test data for acid rain CEM certificaton. The purpose of this handbook is to help you fulfill your requirements under the Acid Rain Program. This handbook will walk you through the necessary steps for gaining CEMS certification, including filling out and mailing the proper forms, administering the required tests, and applying for certification and sending in electronic data to EPA.

NONE

1995-05-12T23:59:59.000Z

98

Post-Closure RCRA Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch  

SciTech Connect (OSTI)

The purpose of this plan is to provide a post-closure groundwater monitoring program for the 216-S-10 Pond and Ditch (S-10) treatment, storage, and/or disposal (TSD) unit. The plan incorporates the sum of knowledge about the potential for groundwater contamination to originate from the S-10, including groundwater monitoring results, hydrogeology, and operational history. The S-10 has not received liquid waste since October 1991. The closure of S-10 has been coordinated with the 200-CS-1 source operable unit in accordance with the Tri-Party Agreement interim milestones M-20-39 and M-15-39C. The S-10 is closely situated among other waste sites of very similar operational histories. The proximity of the S-10 to the other facilities (216-S-17 pond, 216-S-11 Pond, 216-S-5,6 cribs, 216-S-16 ditch and pond, and 216-U-9 ditch) indicate that at least some observed groundwater contamination beneath and downgradient of S-10 could have originated from waste sites other than S-10. Hence, it may not be feasible to strictly discriminate between the contributions of each waste site to groundwater contamination beneath the S-10. A post-closure groundwater monitoring network is proposed that will include the drilling of three new wells to replace wells that have gone dry. When completed, the revised network will meet the intent for groundwater monitoring network under WAC 173-303-645, and enable an improved understanding of groundwater contamination at the S-10. Site-specific sampling constituents are based on the dangerous waste constituents of concern relating to RCRA TSD unit operations (TSD unit constituents) identified in the Part A Permit Application. Thus, a constituent is selected for monitoring if it is: A dangerous waste constituent identified in the Part A Permit Application, or A mobile decomposition product (i.e., nitrate from nitrite) of a Part A constituent, or A reliable indicator of the site-specific contaminants (i.e., specific conductance). Using these criteria, the following constituent list and sampling schedule is proposed: Constituent; Sampling Frequency Site-Specific Parameters; Hexavalent chromium (a); Semiannual Chloride; Semiannual Fluoride; Semiannual Nitrate; Semiannual Nitrite; Semiannual Specific conductance (field)(a); Semiannual Ancillary Parameters; Anions; Annual Alkalinity Annual Metals, (in addition to chromium); Annual pH (field) Semiannual Temperature (field); Semiannual Turbidity (field) Semiannual (a). These constituents will be subject to statistical tests after background is established. It will be necessary to install new monitoring wells and accumulate background data on the groundwater from those wells before statistical comparisons can be made. Until then, the constituents listed above will be evaluated by tracking and trending concentrations in all wells and comparing these results with the corresponding DWS or Hanford Site background concentration for each constituent. If a comparison value (background or DWS) for a constituent is exceeded, DOE will notify Ecology per WAC 173-303-645 (9) (g) requirements (within seven days or a time agreed to between DOE and Ecology).

Barnett, D BRENT.; Williams, Bruce A.; Chou, Charissa J.; Hartman, Mary J.

2006-03-17T23:59:59.000Z

99

3.1 Greater Everglades Wetlands Module CERP Monitoring and Assessment Plan, Part 1 3-3 January 15, 2004  

E-Print Network [OSTI]

3.1 Greater Everglades Wetlands Module CERP Monitoring and Assessment Plan, Part 1 3-3 January 15, 2004 3.1 GREATER EVERGLADES WETLANDS MODULE 3.1.1 Introduction The remaining portion of the Greater Everglades Wetlands includes a mosaic of inter-connected freshwater wetlands and estuaries (Figure 3

Gawlik, Dale E.

100

Geochemistry of trench leachates from Maxey Flats disposal site  

SciTech Connect (OSTI)

The results of the analysis of trench leachates collected at Maxey Flats in October 1981 are presented, and the geochemical factors controlling the trench water chemistry are discussed. In addition, results of laboratory oxidation experiments performed on trench leachates, simulating the behavior of anoxic trench waters as they encounter upon migration an oxidizing environment, are presented.

Dayal, R.; Pietrzak, R.F.; Clinton, J.; Kinsley, M.

1983-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Review Paper/ Biogeochemical Evolution of a Landfill Leachate  

E-Print Network [OSTI]

Review Paper/ Biogeochemical Evolution of a Landfill Leachate Plume, Norman, Oklahoma by I Abstract Leachate from municipal landfills can create groundwater contaminant plumes that may last in the configuration of redox zones downgradient from the Norman Landfill were studied for more than a decade

102

Environmental radiation monitoring plan for depleted uranium and beryllium areas, Yuma Proving Ground  

SciTech Connect (OSTI)

This Environmental Radiation Monitoring Plan (ERM) discusses sampling soils, vegetation, and biota for depleted uranium (DU) and beryllium (Be) at Yuma Proving Ground (YPG). The existing ERM plan was used and modified to more adequately assess the potential of DU and Be migration through the YPG ecosystem. The potential pathways for DU and Be migration are discussed and include soil to vegetation, soil to animals, vegetation to animals, animals to animals, and animals to man. Sample collection will show DU deposition and will be used to estimate DU migration. The number of samples from each area varies and depends on if the firing range of interest is currently used for DU testing (GP 17A) or if the range is not used currently for DU testing (GP 20). Twenty to thirty-five individual mammals or lizards will be sampled from each transect. Air samples and samples of dust in the air fall will be collected in three locations in the active ranges. Thirty to forty-five sediment samples will be collected from different locations in the arroys near the impact areas. DU and Be sampling in the Hard Impact and Soft Impact areas changed only slightly from the existing ERM. The modifications are changes in sample locations, addition of two sediment transport locations, addition of vegetation samples, mammal samples, and air sampling from three to five positions on the impact areas. Analysis of samples for DU or total U by inductively-coupled mass spectroscopy (ICP/MS), cc spectroscopy, neutron activation analysis (NAA), and kinetic phosphorimetric analysis (KPA) are discussed, and analysis for Be by ICP/MS are recommended. Acquiring total U (no isotope data) from a large number of samples and analysis of those samples with relatively high total U concentrations results in fewer isotopic identifications but more information on U distribution. From previous studies, total U concentrations greater than about 3 times natural background are usually DU by isotopic confirmation.

Ebinger, M.H.; Hansen, W.R.

1994-05-11T23:59:59.000Z

103

School of Architecture, Design and the Built Environment Urban Energy Monitoring to Support Sustainable Energy Planning  

E-Print Network [OSTI]

Sustainable Energy Planning Lead: Professor Benachir Medjdoub This project is part of a research portfolio and development is sustainable. While a great deal of expertise already exists in detailing and constructing low-energy systematic integrated mechanisms to assist urban managers in their sustainable energy planning decision

Evans, Paul

104

Long-term Monitoring Plan for the Central Nevada Test Area  

SciTech Connect (OSTI)

The groundwater flow and transport model of the Faultless underground nuclear test conducted at the Central Nevada Test Area (CNTA) was accepted by the state regulator and the environmental remediation efforts at the site have progressed to the stages of model validation and long-term monitoring design. This report discusses the long-term monitoring strategy developed for CNTA. Subsurface monitoring is an expensive and time-consuming process, and the design approach should be based on a solid foundation. As such, a thorough literature review of monitoring network design is first presented. Monitoring well networks can be designed for a number of objectives including aquifer characterization, parameter estimation, compliance monitoring, detection monitoring, ambient monitoring, and research monitoring, to name a few. Design methodologies also range from simple hydrogeologic intuition-based tools to sophisticated statistical- and optimization-based tools. When designing the long-term monitoring well network for CNTA, a number of issues are carefully considered. These are the uncertainty associated with the subsurface environment and its implication for monitoring design, the cost associated with monitoring well installation and operation, the design criteria that should be used to select well locations, and the potential conflict between different objectives such as early detection versus impracticality of placing wells in the vicinity of the test cavity. Given these considerations and the literature review of monitoring design studies, a multi-staged approach for development of the long-term monitoring well network for CNTA is proposed. This multi-staged approach will proceed in parallel with the validation efforts for the groundwater flow and transport model of CNTA. Two main stages are identified as necessary for the development of the final long-term monitoring well network for the site. The first stage is to use hydrogeologic expertise combined with model simulations and probability based approaches to select the first set of monitoring wells that will serve two purposes. The first is to place the wells in areas likely to encounter migration pathways thereby enhancing the probability of detecting radionuclide migration in the long run. The second objective is crucial in the short run and is aimed at using this set of wells to collect validation data for the model. The selection criteria should thus balance these two objectives. Based on the results of the validation process that progresses concurrently with the first monitoring stage, either more wells will be needed in this first stage or the second stage will be initiated. The second monitoring design stage will be based on an optimum design methodology that uses a suitable statistical approach, combined with an optimization approach, to augment the initial set of wells and develop the final long-term monitoring network. The first-stage probabilistic analysis conducted using the CNTA model indicates that the likelihood of migration away from the test cavity is very low and the probability of detecting radionuclides in the next 100 years is extremely low. Therefore, it is recommended to place one well in the downstream direction along the model longitudinal centerline (i.e., directly north of the working point), which is the location with the highest probability of encountering the plume. Lack of significant plume spreading, coupled with the extremely low velocities, suggests that this one well is sufficient for the first stage. Data from this well, and from additional wells located with validation as the prime objective, will benefit the model validation process. In the long run, this first monitoring well is going to be crucial for the long-term monitoring of the site (assuming that the flow model is validated), as it will be the most likely place to detect any plume migration away from the cavity.

A. Hassan

2003-09-02T23:59:59.000Z

105

Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site  

SciTech Connect (OSTI)

Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

S. E. Rawlinson

2001-09-01T23:59:59.000Z

106

Mutagenicity and genotoxicity of coal fly ash water leachate  

SciTech Connect (OSTI)

Fly ash is a by-product of coal-fired electricity generation plants. The prevalent practice of disposal is as slurry of ash and water to storage or ash ponds located near power stations. This has lain to waste thousands of hectares of land all over the world. Since leaching is often the cause of off-site contamination and pathway of introduction into the human environment, a study on the genotoxic effects of fly ash leachate is essential. Leachate prepared from the fly ash sample was analyzed for metal content, and tested for mutagenicity and genotoxicity. Analyses of metals show predominance of the metals - sodium, silicon, potassium, calcium, magnesium, iron, manganese, zinc, and sulphate. The Ames Salmonella mutagenicity assay, a short-term bacterial reverse mutation assay, was conducted on two-tester strains of Salmonella typhimurium strains TA97a and TA102. For genotoxicity, the alkaline version of comet assay on fly ash leachate was carried in vitro on human blood cells and in vivo on Nicotiana plants. The leachate was directly mutagenic and induced significantconcentration-dependent increases in DNA damage in whole blood cells, lymphocytes, and in Nicotiana plants. The comet parameters show increases in tail DNA percentage (%), tail length (mu m), and olive tail moment (arbitrary units). Our results indicate that leachate from fly ash dumpsites has the genotoxic potential and may lead to adverse effects on vegetation and on the health of exposed human populations.

Chakraborty, R.; Mukherjee, A. [University of Calcutta, Calcutta (India). Dept. of Botany

2009-03-15T23:59:59.000Z

107

Selection of a method for disposing of leachate grout  

SciTech Connect (OSTI)

A major component of the selected remedy for the remediation of the Maxey Flats Disposal Site (MFDS) is the removal, solidification, and on-site disposal of an estimated 3000000 gal of trench leachate. The Record of Decision (ROD) and its predecessor, the Maxey Flats Feasibility Study Report, proposed as a representative process option that the trench leachate be solidified in the form of large (8 x 8 x 4 ft) concrete blocks and disposed of in trenches. The U.S. Environmental Protection Agency (EPA) had recent experience with this method when solidifying and disposing of {approximately}300000 gal of leachate that was stored in above-ground tanks at the MFDS. The EPA experience proved the capability of a U.S. Nuclear Regulatory Commission (NRC)-approved grout mix to satisfy the requirements of 10CFR61.55-56 for the Class-A liquid waste at the site, i.e., the leachate. However, a technical evaluation of the overall solidification/disposal process implemented by the EPA identified some steps that should be improved if this method is to be implemented safely and efficiently for the solidification and disposal of trench leachate as part of the remedial action. In the light of the EPA experience, the present study modified the option proposed in the ROD to make it more workable. This study also evaluated other methods, including three methods for above grade disposal.

Cockrell, R.G.

1994-12-31T23:59:59.000Z

108

Some chemical and mineralogical considerations important for understanding leachate chemistry  

SciTech Connect (OSTI)

Both the raw shale material and the retorting process parameters are influential in determining the subsequent behavior of the spent shale solids with respect to leaching and/or environmental weathering. The process parameters define the mineral reactions that occur to form the mineral assemblage in the spent shale, while the major and trace element residences and mobilities from the raw shale determine the extent of incorporation of these elements in the spent shale matrix and ultimately the composition of leachate generated by the spent shale solid: water interaction. In order to understand leachate compositions, it is necessary to determine this water: solid interaction, but the solid wastes being considered are a dependent function of the raw shale material and the process parameters. Thus, in order to understand the chemical principles operative in leachate generation, it is necessary to elucidate the interplay of the raw material and the process parameters in the formation of the waste and then the interaction of the waste form with water. The leachate and the solid waste are dependent variables, while the raw shale and the process parameters are independent variables. These considerations are illustrated by results of chemical characterization and experimental studies of field generated spent shales. Results from field generated materials are used to describe important considerations relative to the understanding of leachate chemistry.

Peterson, E.J.; Wagner, P.

1982-01-01T23:59:59.000Z

109

Monitoring  

SciTech Connect (OSTI)

The invention provides apparatus and methods which facilitate movement of an instrument relative to an item or location being monitored and/or the item or location relative to the instrument, whilst successfully excluding extraneous ions from the detection location. Thus, ions generated by emissions from the item or location can successfully be monitored during movement. The technique employs sealing to exclude such ions, for instance, through an electro-field which attracts and discharges the ions prior to their entering the detecting location and/or using a magnetic field configured to repel the ions away from the detecting location.

Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

2004-11-23T23:59:59.000Z

110

Justifying and Planning an Energy Monitoring System in an Existing Plant  

E-Print Network [OSTI]

benefits are needed on all sites. For example, harmonic monitoring is only needed on substations with tuned filters. Disturbance monitoring is only needed on purchased power substations and on large adjustable speed-drive applications where power dip... availability. Under permanent investment, include the cost of potential new substations and medium voltage feeders; count potential energy savings from interruptible load and peak shaving under variable cost. Conceptual Design and Estimating. When a...

Stublen, A. P.; Wellman, C. M.; Kell, S. A.

111

E-Print Network 3.0 - ash dump leachate Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Volume 28, no. 1, Jan.-Feb. 1999.Copyright0 1999,ASA, CSSA, SSSA Summary: ). Leachate Analysis PH The pH values for all leachates from the ash- and sludge-amended soil columns...

112

Indicating landfill stabilization state by using leachate property from Laogang Refuse Landfill  

Science Journals Connector (OSTI)

Variation and evolution process of leachate can be applied as a reference for landfill stabilization phase. In this work, leachates ... with different ages were collected from Laogang Refuse Landfill, and charact...

Ziyang Lou; Xiaoli Chai; Youcai Zhao

2014-06-01T23:59:59.000Z

113

Technical assistance to Ohio closure sites; Technologies to address leachate from the on-site disposal facility at Fernald Environmental Management Project, Ohio  

SciTech Connect (OSTI)

On August 6-7, 2002, a Technical Assistance Team (''Team'') from the U.S. Department of Energy (DOE) Subsurface Contaminants Focus Area (SCFA) met with Fernald Environmental Management Project (FEMP) personnel in Ohio to assess approaches to remediating uranium-contaminated leachate from the On-Site Disposal Facility (OSDF). The Team was composed of technical experts from national labs, technology centers, and industry and was assembled in response to a request from the FEMP Aquifer Restoration Project. Dave Brettschneider of Fluor Fernald, Inc., requested that a Team of experts be convened to review technologies for the removal of uranium in both brine ion exchange regeneration solution from the Advanced Wastewater Treatment facility and in the leachate from the OSDF. The Team was asked to identify one or more technologies for bench-scale testing as a cost effective alternative to remove uranium so that the brine regeneration solution from the Advanced Waste Water Treatment facility and the leachate from the OSDF can be discharged without further treatment. The Team was also requested to prepare a recommended development and demonstration plan for the alternative technologies. Finally, the Team was asked to make recommendations on the optimal technical solution for field implementation. The Site's expected outcomes for this effort are schedule acceleration, cost reduction, and better long-term stewardship implementation. To facilitate consideration of the most appropriate technologies, the Team was divided into two groups to consider the brine and the leachate separately, since they represent different sources with different constraints on solutions, e.g., short-term versus very long-term and concentrated versus dilute contaminant matrices. This report focuses on the technologies that are most appropriate for the leachate from the OSDF. Upon arriving at FEMP, project personnel asked the Team to concentrate its efforts on evaluating potential technologies and strategies to reduce uranium concentration in the leachate.

Hazen, Terry

2002-08-26T23:59:59.000Z

114

Determination of monitor unit check tolerances based on a comparison with measurement and treatment planning system data  

SciTech Connect (OSTI)

ABSTRACT: This work describes the experimental validation of treatment planning system monitor unit (MU) calculations against measurement for a range of scenarios. This, together with a comparison of treatment planning system MUs and an independent MU check method, allows the derivation of confidence intervals for the check process. Data were collected for open and 60 motorized wedge fields using an Elekta Synergy linac at 6 and 8 MV using homogeneous and heterogeneous phantoms. Masterplan (Version 4.0) pencil-beam and collapsed cone algorithms were used for the primary MU calculations with full inhomogeneity correction. Results show that both algorithms agree with measurement to acceptable tolerance levels in the majority of the cases studied. The confidence interval for the pencil-beam algorithm MU against an independent check was determined as + 1.6% to ?3.4%. This is modified to + 2.3% to ?2.5% when data collected with low-density heterogeneities are removed as this algorithm is not used clinically for these cases. The corresponding interval for the collapsed cone algorithm was + 1.2% to ?4.3%, indicating that an offset tolerance for the independent check is appropriate. Analysis of clinical conformal treatment plan data generated using the pencil-beam algorithm (1393 beams) returned 93% of beams within the independent check tolerance. Similarly, using the collapsed cone algorithm as the primary MU calculation, 77% (of 1434 beams) were within the confidence interval.

Curtis, Helen [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom); Richmond, Neil, E-mail: neil.richmond@stees.nhs.uk [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom); Burke, Kevin; Walker, Chris [Medical Physics Department, The James Cook University Hospital, Middlesbrough (United Kingdom)

2013-04-01T23:59:59.000Z

115

Groundwater Monitoring and Tritium-Tracking Plan for the 200 Area State-Approved Land Disposal Site  

SciTech Connect (OSTI)

The 200 Area State-Approved Land Disposal Site (SALDS) is a drainfield which receives treated wastewater, occasionally containing high levels of tritium from treatment of Hanford Site liquid wastes. Only the SALDS proximal wells (699-48-77A, 699-48-77C, and 699-48-77D) have been affected by tritium from the facility thus far; the highest activity observed (2.1E+6 pCi/L) occurred in well 699-48-77D in February 1998. Analytical results of groundwater geochemistry since groundwater monitoring began at the SALDS indicate that all constituents with permit enforcement limits have been below those limits with the exception of one measurement of total dissolved solids (TDS) in 1996. The revised groundwater monitoring sampling and analysis plan eliminates chloroform, acetone, tetrahydrofuran, benzene, and ammonia as constituents. Replicate field measurements will replace laboratory measurements of pH for compliance purposes. A deep companion well to well 699-51-75 will be monitored for tritium deeper in the uppermost aquifer.

Barnett, D. Brent

2000-08-31T23:59:59.000Z

116

Developing a monitoring and verification plan with reference to the Australian Otway CO2 pilot project  

SciTech Connect (OSTI)

The Australian Cooperative Research Centre for Greenhouse Gas Technologies (CO2CRC) is currently injecting 100,000 tons of CO{sub 2} in a large-scale test of storage technology in a pilot project in southeastern Australia called the CO2CRC Otway Project. The Otway Basin, with its natural CO{sub 2} accumulations and many depleted gas fields, offers an appropriate site for such a pilot project. An 80% CO{sub 2} stream is produced from a well (Buttress) near the depleted gas reservoir (Naylor) used for storage (Figure 1). The goal of this project is to demonstrate that CO{sub 2} can be safely transported, stored underground, and its behavior tracked and monitored. The monitoring and verification framework has been developed to monitor for the presence and behavior of CO{sub 2} in the subsurface reservoir, near surface, and atmosphere. This monitoring framework addresses areas, identified by a rigorous risk assessment, to verify conformance to clearly identifiable performance criteria. These criteria have been agreed with the regulatory authorities to manage the project through all phases addressing responsibilities, liabilities, and to assure the public of safe storage.

Dodds, K.; Daley, T.; Freifeld, B.; Urosevic, M.; Kepic, A.; Sharma, S.

2009-05-01T23:59:59.000Z

117

Annual Report for Gravity Collection Lysimeter Monitoring Plan- ERDF Cells 5 and 6, CY 2008  

SciTech Connect (OSTI)

The purpose of this annual report is to evaluate the conditions and identify trends to develop Hanford site-specific data on the performance of the lysimeter systems related to the vadose zone monitoring and potential future use of lysimeter systems.

R. L. Weiss; D. W. Woolery

2009-08-25T23:59:59.000Z

118

Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program  

SciTech Connect (OSTI)

This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

NONE

1995-09-01T23:59:59.000Z

119

Anaerobic Methane Oxidation in a Landfill-Leachate Plume  

E-Print Network [OSTI]

wells ranging in depth from 1.3 to 11 m that were oriented parallel to the flow path. The center of the leachate plume was characterized by (1) high alkalinity and elevated concentrations of total dissolved organic carbon, reduced iron, and methane...

Grossman, E. L.; Cifuentes, L. A.; Cozzarelli, I. M.

2002-01-01T23:59:59.000Z

120

Characterization of plutonium in Maxey Flats radioactive trench leachates  

SciTech Connect (OSTI)

Plutonium in trench leachates at the Maxey Flats radioactive waste disposal site exists as dissolved species, primarily complexes of the tetravalent ion with strong organic ligands such as ethylenediaminetetraacetic acid. The complexes are not sorbed well by sediment and are only partly precipitated by ferric hydroxide. These results indicate the importance of isolating radioactive waste from organic matter. 3 tables.

Cleveland, J.M.; Rees, T.F.

1981-06-26T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Anaerobic Methane Oxidation in a Landfill-Leachate Plume  

E-Print Network [OSTI]

Anaerobic Methane Oxidation in a Landfill-Leachate Plume E T H A N L . G R O S S M A N , * , L U I Landfill, OK, provides an excellent natural laboratory for the study of anaerobicprocessesimpactinglandfill enrichment indicated that 80-90% of the original landfill methane was oxidized over the 210-m transect. First

Grossman, Ethan L.

122

The Northwest Geysers EGS Demonstration Project Phase 1: Pre-stimulation coupled geomechanical modeling to guide stimulation and monitoring plans  

SciTech Connect (OSTI)

This paper presents activities and results associated with Phase 1 (pre-stimulation phase) of an Enhanced Geothermal System (EGS) demonstration project at the northwest part of The Geysers geothermal field, California. The paper presents development of a 3-D geological model, coupled thermal-hydraulic-mechanical (THM) modeling of proposed stimulation injection as well as current plans for stimulation and monitoring of the site. The project aims at creating an EGS by directly and systematically injecting cool water at relatively low pressure into a known High Temperature (about 280 to 350 C) Zone (HTZ) located under the conventional (240 C) steam reservoir at depths of {approx}3 km. Accurate micro-earthquake monitoring initiated before the start of the injection will be used as a tool for tracking the development of the EGS and monitoring changes in microseismicity. We first analyzed historic injection and micro-earthquake data from an injection well (Aidlin 11) located about 3 miles to the west of the new EGS demonstration area. Thereafter, we used the same modeling approach to predict the likely extent of the zone of enhanced permeability for a proposed initial injection in two wells (Prati State 31 and Prati 32) at the new EGS demonstration area. Our modeling indicates that the proposed injection scheme will provide additional steam production in the area by creating a zone of permeability enhancement extending about 0.5 km from each injection well which will connect to the overlying conventional steam reservoir, in agreement with the conclusions of Nielson and Moore (2000).

Rutqvist, J.; Dobson, P.F.; Oldenburg, C.M.; Garcia, J.; Walters, M.

2010-10-20T23:59:59.000Z

123

Growth and biomass of Populus irrigated with landfill leachate  

Science Journals Connector (OSTI)

Resource managers are challenged with waste disposal and leachate produced from its degradation. Poplar (Populus spp.) trees offer an opportunity for ecological leachate disposal as an irrigation source for managed tree systems. Our objective was to irrigate Populus trees with municipal solid waste landfill leachate or fertilized well water (control) (N, P, K) during the 2005 and 2006 growing seasons and test for differences in tree height, diameter, volume, and biomass of leaves, stems, branches, and roots. The trees were grown at the Oneida County Landfill located 6km west of Rhinelander, Wisconsin, USA (45.6N, 89.4W). Eight clones belonging to four genomic groups were tested: NC13460, NC14018 [(Populus trichocarpa Torr. & GrayנPopulus deltoides Bartr. ex Marsh)נP. deltoides BC1]; NC14104, NC14106, DM115 (P. deltoidesנPopulus maximowiczii A. Henry DM); DN5 (P. deltoidesנPopulus nigra L. DN); NM2, NM6 (P. nigraנP. maximowiczii NM). The survival rate for each of the irrigation treatments was 78%. The total aboveground biomass ranged from 0.51 to 2.50Mgha?1, with a mean of 1.57Mgha?1. The treatmentנclone interaction was not significant for tree diameter, total volume, dry mass of the stump or basal roots, or root mass fraction (P>0.05). However, the treatmentנclone interaction was significant for height, total tree dry mass, aboveground dry mass, belowground dry mass, and dry mass of the leaves, stems+branches (woody), and lateral roots (P<0.05). There was broad clonal variation within the BC1 and DM genomic groups, with genotypes performing differently for treatments. In contrast, the performance of the NM and DN genomic groups was relatively stable across treatments, with clonal response to irrigation being similar regardless of treatment. Nevertheless, selection at the clone level also was important. For example, NC14104 consistently performed better when irrigated with leachate compared with water, while NC14018 responded better to water than leachate. Overall, these data will serve as a basis for researchers and resource managers making decisions about future leachate remediation projects.

Jill A. Zalesny; Ronald S. Zalesny Jr.; David R. Coyle; Richard B. Hall

2007-01-01T23:59:59.000Z

124

Microsoft Word - Appendix J-LCRS-Train 3 Treament Contingency Plan1.doc  

Office of Legacy Management (LM)

LCRS/Train 3 Treatment Contingency Plan U.S. Department of Energy Weldon Spring Site LTS&M Plan July 2005 Doc. No. S0079000 Page J-3 J1.0 Contingency Plan Overview J1.1 Background The disposal cell at the Weldon Spring Site currently (August 2004) generates approximately 200 gallons of leachate per day, and manganese concentrations in the leachate exceeds the permitted effluent limit. The LCRS sump capacity is approximately 11,000 gallons, or 45 days of storage at the current flow rate. The uranium activity is below the discharge goal stated in the NPDES permit. This leachate is currently being hauled to the Metropolitan Sewer District (MSD) via commercial hauler for disposal and treatment under an approval granted to DOE on December 21, 2001, by the MSD. DOE had originally expected to treat the leachate on-site and

125

Chemical, Electrochemical and Spectral Characterization of Water Leachates from Biomass  

Science Journals Connector (OSTI)

(10) During washing, a fraction of organic compounds and inorganic ions enter the water. ... After being allowed to air dry in the field, all samples were cut with a herb shredder and then sieved to 280450 ?m. ... The light gray column represents the calculated value of the weight of K removed from a 12.5-g biomass sample, and the gray column represents the measured value of K in 1.0 L of leachate. ...

Lei Deng; Defu Che

2012-11-08T23:59:59.000Z

126

TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241-AY-101 MULTI-PROBE CORROSION MONITORING SYSTEM  

SciTech Connect (OSTI)

This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

WYRWAS RB; PAGE JS; COOKE GS

2012-04-19T23:59:59.000Z

127

Metal speciation in landfill leachates with a focus on the influence of organic matter  

E-Print Network [OSTI]

fractions of leachates, a cascade filtration protocol was applied directly in the field, under a nitrogen gas atmosphere to avoid metal oxidation. The results of analyses performed on the leachates suggest mobility and natural attenuation in a context of landfill risk assessment are discussed. hal-00605888

Paris-Sud XI, Université de

128

Unusual calcite stromatolites and pisoids from a landfill leachate collection system  

Science Journals Connector (OSTI)

...with leachate. The remaining void space is filled with landfill gas, which is composed mainly of methane and carbon dioxide...with leachate. The remaining void space is filled with landfill gas, which is composed mainly of methane and carbon dioxide...

129

Nitrogen removal via nitrite in a sequencing batch reactor treating sanitary landfill leachate  

E-Print Network [OSTI]

Nitrogen removal via nitrite in a sequencing batch reactor treating sanitary landfill leachate, for the automation of a bench-scale SBR treating leachate generated in old landfills. Attention was given 20­30% due to the low biodegradability of organic matter in the leach- ate from old landfills

130

Geochemistry of trench leachates at low-level radioactive waste burial sites  

SciTech Connect (OSTI)

Trench leachates from the low-level radioactive waste burial sites at Maxey Flats, Kentucky and Barnwell, South Carolina were sampled and analyzed for dissolved inorganic, organic, and radionuclide constituents. Relative to local groundwaters, the trench leachates exhibit significant modifications in major ion and radionuclide compositions. The formation and composition of the leachates can be attributed to site-specific hydrological and geochemical factors. Leaching and microbial degradation of waste materials are considered to be the important geochemical processes controlling the leachate compositions. Elevated concentrations of Na, K, Ca, Mg, Cl, dissolved organic and inorganic carbon, and various anthropogenic radionuclides reflect leaching of waste materials. Anoxic conditions as characterized by depletion of dissolved oxygen and sulphate, and high contents of alkalinity and ammonia reflect microbial decomposition of organic waste materials. Because of relatively stagnant water accumulations, the extent of modification is much greater in the Maxey Flats leachates as compared with those from Barnwell. 8 references, 2 figures, 2 tables.

Dayal, R.; Pietrzak, R.F.; Clinton, J.

1984-01-01T23:59:59.000Z

131

Successes in School Energy Management - Energy Monitoring  

E-Print Network [OSTI]

Successes in School Energy Management ? Energy Monitoring Chad Corbitt, CEM, ATEM Energy Manager, Klein ISD jcorbitt1@kleinisd.net Wednesday, October 10, 2012 Keys to Energy Monitoring ? Develop an Energy Monitoring plan ? Define... the why, what, how and who of the plan ? Implement the Energy Monitoring plan ? Personnel, data system, reporting ? One Experience in Energy Monitoring Developing an Energy Monitoring Plan ? Why do we need to monitor energy? ? What information...

Corbitt, C.

2012-01-01T23:59:59.000Z

132

Grantee Checklist for the Inspection & Monitoring Requirement  

Broader source: Energy.gov [DOE]

This document walks Grantees through the Inspection & Monitoring requirement of the Quality Work Plan.

133

Removal of organic and inorganic compounds from landfill leachate using reverse osmosis  

Science Journals Connector (OSTI)

The main objective of this work was to evaluate an effectiveness of removing organic and inorganic pollutants from landfill leachate in a long-term reverse osmosis (RO) study. Investigations were carried out...4 ...

I. A. Talalaj

2014-08-01T23:59:59.000Z

134

Overburden effects on waste compaction and leachate generation in municipal landfills  

E-Print Network [OSTI]

This thesis presents a model to predict the effects of overburden pressure on the formation of leachate within municipal solid waste landfills. In addition, it estimates the compaction and subsequent settlement that the waste will undergo due...

Mehevec, Adam Wade

2012-06-07T23:59:59.000Z

135

Review of Monitoring Plans for Gas Bubble Disease Signs and Gas Supersaturation Levels on the Columbia and Snake Rivers.  

SciTech Connect (OSTI)

Montgomery Watson was retained by the Bonneville Power Administration to evaluate the monitoring program for gas bubble disease signs and dissolved gas supersaturation levels on the Columbia and Snake rivers. The results of this evaluation will provide the basis for improving protocols and procedures for future monitoring efforts. Key study team members were Dr. John Colt, Dr. Larry Fidler, and Dr. Ralph Elston. On the week of June 6 through 10, 1994 the study team visited eight monitoring sites (smolt, adult, and resident fish) on the Columbia and Snake rivers. Additional protocol evaluations were conducted at the Willard Field Station (National Biological Survey) and Pacific Northwest Laboratories at Richland (Battelle). On June 13 and 14, 1994, the study team visited the North Pacific Division office of the U.S. Corps of Engineers and the Fish Passage Center to collect additional information and data on the monitoring programs. Considering the speed at which the Gas Bubble Trauma Monitoring Program was implemented this year, the Fish Passage Center and cooperating Federal, State, and Tribal Agencies have been doing an incredible job. Thirty-one specific recommendations are presented in this report and are summarized in Section 14.

Fidler, Larry; Elston, Ralph; Colt, John

1994-07-01T23:59:59.000Z

136

Tracer method to measure landfill gas emissions from leachate collection systems  

Science Journals Connector (OSTI)

This paper describes a method developed for quantification of gas emissions from the leachate collection system at landfills and present emission data measured at two Danish landfills with no landfill gas collection systems in place: Fakse landfill and AV Milj. Landfill top covers are often designed to prevent infiltration of water and thus are made from low permeable materials. At such sites a large part of the gas will often emit through other pathways such as the leachate collection system. These point releases of gaseous constituents from these locations cannot be measured using traditional flux chambers, which are often used to measure gas emissions from landfills. Comparing tracer measurements of methane (CH4) emissions from leachate systems at Fakse landfill and AV Milj to measurements of total CH4 emissions, it was found that approximately 47% (351kg CH4 d?1) and 27% (211kg CH4 d?1), respectively, of the CH4 emitting from the sites occurred from the leachate collection systems. Emission rates observed from individual leachate collection wells at the two landfills ranged from 0.1 to 76kg CH4 d?1. A strong influence on emission rates caused by rise and fall in atmospheric pressure was observed when continuously measuring emission from a leachate well over a week. Emission of CH4 was one to two orders of magnitude higher during periods of decreasing pressure compared to periods of increasing pressure.

Anders M. Fredenslund; Charlotte Scheutz; Peter Kjeldsen

2010-01-01T23:59:59.000Z

137

The 1993 baseline biological studies and proposed monitoring plan for the Device Assembly Facility at the Nevada Test Site  

SciTech Connect (OSTI)

This report contains baseline data and recommendations for future monitoring of plants and animals near the new Device Assembly Facility (DAF) on the Nevada Test Site (NTS). The facility is a large structure designed for safely assembling nuclear weapons. Baseline data was collected in 1993, prior to the scheduled beginning of DAF operations in early 1995. Studies were not performed prior to construction and part of the task of monitoring operational effects will be to distinguish those effects from the extensive disturbance effects resulting from construction. Baseline information on species abundances and distributions was collected on ephemeral and perennial plants, mammals, reptiles, and birds in the desert ecosystems within three kilometers (km) of the DAF. Particular attention was paid to effects of selected disturbances, such as the paved road, sewage pond, and the flood-control dike, associated with the facility. Radiological monitoring of areas surrounding the DAF is not included in this report.

Woodward, B.D.; Hunter, R.B.; Greger, P.D.; Saethre, M.B.

1995-02-01T23:59:59.000Z

138

Meeting an unmet need for family planning Forthcoming summit will tackle questions of funding, service delivery, and monitoring  

E-Print Network [OSTI]

million women in low income countries access to family planning by 2020. Achieving this target, which fiscal constraint--combined with transformational cost effective approaches to increasing coverage. Women Additional benefits include alleviation of poverty, empowerment of women, and enhanced environmental

Klein, Ophir

139

Microsoft Word - Appendix I-LCRS Operating Plan.doc  

Office of Legacy Management (LM)

July 2005 Doc. No. S0079000 July 2005 Doc. No. S0079000 Page I-3 I1.0 Purpose The purpose of this document is to provide information necessary for the proper operation and maintenance of the Leachate Collection and Removal System (LCRS). Specifically, the subsequent sections will provide the information relating to the management of leachate, maintenance and calibration of liquid level, general equipment maintenance, and reporting requirements. I2.0 Facility Description The LCRS facility is located at the north end of the disposal cell and consists of an 11,500-gallon horizontal below-grade pipe storage sump, four pipes from the disposal cell (east and west primary and east and west secondary) to convey the leachate to the sump, liquid level monitoring instruments, and other related equipment. An 8-foot chain link and barbed wire fence surrounds

140

Nitrogen management in landfill leachate: Application of SHARON, ANAMMOX and combined SHARON-ANAMMOX process  

SciTech Connect (OSTI)

Highlights: Black-Right-Pointing-Pointer Significant research on ammonia removal from leachate by SHARON and ANAMMOX process. Black-Right-Pointing-Pointer Operational parameters, microbiology, biochemistry and application of the process. Black-Right-Pointing-Pointer SHARON-ANAMMOX process for leachate a new research and this paper gives wide facts. Black-Right-Pointing-Pointer Cost-effective process, alternative to existing technologies for leachate treatment. Black-Right-Pointing-Pointer Address the issues and operational conditions for application in leachate treatment. - Abstract: In today's context of waste management, landfilling of Municipal Solid Waste (MSW) is considered to be one of the standard practices worldwide. Leachate generated from municipal landfills has become a great threat to the surroundings as it contains high concentration of organics, ammonia and other toxic pollutants. Emphasis has to be placed on the removal of ammonia nitrogen in particular, derived from the nitrogen content of the MSW and it is a long term pollution problem in landfills which determines when the landfill can be considered stable. Several biological processes are available for the removal of ammonia but novel processes such as the Single Reactor System for High Activity Ammonia Removal over Nitrite (SHARON) and Anaerobic Ammonium Oxidation (ANAMMOX) process have great potential and several advantages over conventional processes. The combined SHARON-ANAMMOX process for municipal landfill leachate treatment is a new, innovative and significant approach that requires more research to identify and solve critical issues. This review addresses the operational parameters, microbiology, biochemistry and application of both the processes to remove ammonia from leachate.

Sri Shalini, S., E-mail: srishalini10@gmail.com [Centre for Environmental Studies, Anna University, Chennai (India); Joseph, Kurian, E-mail: kuttiani@gmail.com [Centre for Environmental Studies, Anna University, Chennai (India)

2012-12-15T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Assessment of metal content and toxicity of leachates from teapots  

Science Journals Connector (OSTI)

Metallic teapots traditionally used in Morocco were investigated for release of toxic metals from the teapots and their toxicity, as determined by MetPAD, a bacterial toxicity test that is specific for heavy metal toxicity. Our data show that some teapots were non-toxic while a few others were highly toxic, as shown by MetPAD. Tea addition reduced somewhat heavy metal toxicity due possibly to the complexing ability of tea. Chemical analysis of teapot leachates showed that some contained zinc and copper. Teapot No. 5, which showed the highest toxicity, also displayed the highest Zn concentration (7.39 mg/l), confirming the toxicity data. Based on estimates of tea consumption in Morocco, we showed that the extra daily burden of Zn ranged from 1.75 to 4.2 mg/day, assuming the maximum zinc concentration of 7.4 mg/l, as found in our study. This represents 3.58% of the LOAEL for zinc of 50 mg/day and would not be important as compared to other sources of zinc intake.

Ali Boularbah; Gabriel Bitton; J.L Morel

1999-01-01T23:59:59.000Z

142

Sixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan  

E-Print Network [OSTI]

are organized by resource areas, Bonneville Power Administration, and Council monitoring activities. In manySixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan Introduction ................................................. 15 Future Role of Bonneville

143

Monitoring multiple endpoints in prevention trials.  

Science Journals Connector (OSTI)

...the primary hypothesis and a plan for interim monitoring of the...body charged with the interim review of study findings is a group...the formal interim monitoring plan usually involves a sequential...monitoring for the STAR included a plan for the monitoring of the primary...

Joseph P. Costantino

2006-12-01T23:59:59.000Z

144

Toxicity of tire wear particle leachate to the marine macroalga, Ulva lactuca  

Science Journals Connector (OSTI)

Tire wear particles filed from the treads of end-of-life vehicle tires have been added to sea water to examine the release of Zn and the toxicity of the resulting leachate and dilutions thereof to the marine macroalga, Ulva lactuca. Zinc release appeared to be diffusion-controlled, with a conditional rate constant of 5.4?g[L(h)1/2]?1, and about 1.6% of total Zn was released after 120h incubation. Exposure to increasing concentrations of leachate resulted in a non-linear reduction in the efficiency of photochemical energy conversion of U. lactuca and, with the exception of the undiluted leachate, increasing accumulation of Zn. Phototoxicity was significantly lower on exposure to equivalent concentrations of Zn added as Zn(NO3)2, suggesting that organic components of leachate are largely responsible for the overall toxicity to the alga. Given the ubiquity and abundance of TWP in urban coastal sediments, the generation, biogeochemistry and toxicity of tire leachate in the marine setting merit further attention.

Andrew Turner; Lynsey Rice

2010-01-01T23:59:59.000Z

145

Chemical pollution and toxicity of water samples from stream receiving leachate from controlled municipal solid waste (MSW) landfill  

Science Journals Connector (OSTI)

Abstract The present study was aimed to determine the impact of municipal waste landfill on the pollution level of surface waters, and to investigate whether the choice and number of physical and chemical parameters monitored are sufficient for determining the actual risk related to bioavailability and mobility of contaminants. In 20072012, water samples were collected from the stream flowing through the site at two sampling locations, i.e. before the stream?s entry to the landfill, and at the stream outlet from the landfill. The impact of leachate on the quality of stream water was observed in all samples. In 20072010, high values of TOC and conductivity in samples collected down the stream from the landfill were observed; the toxicity of these samples was much greater than that of samples collected up the stream from the landfill. In 20102012, a significant decrease of conductivity and TOC was observed, which may be related to the modernization of the landfill. Three tests were used to evaluate the toxicity of sampled water. As a novelty the application of Phytotoxkit F for determining water toxicity should be considered. Microtox showed the lowest sensitivity of evaluating the toxicity of water samples, while Phytotoxkit F showed the highest. High mortality rates of Thamnocephalus platyurus in Thamnotoxkit F test can be caused by high conductivity, high concentration of TOC or the presence of compounds which are not accounted for in the water quality monitoring program.

A. Melnyk; K. Kukli?ska; L. Wolska; J. Namie?nik

2014-01-01T23:59:59.000Z

146

Polycyclic aromatic hydrocarbons (PAH) in top soil, leachate and groundwater from Ruseifa solid waste landfill, Jordan  

Science Journals Connector (OSTI)

The distribution profiles and pathways of polynuclear aromatic hydrocarbons in the surroundings of Ruseifa landfill area in Jordan were investigated for surface sediments, leachate, and groundwater. The total concentration of 16 polycyclic aromatic hydrocarbons (PAHs) in sediments ranged from 286 to 1704 ppm with an average value of 751 ppm. Meanwhile, concentrations of PAH in groundwater ranged between 7.1 and 12.6 ppm with an average value of 9.1 ppm. The PAH in leachate varied between 0.10 and 0.40 with an average value of 0.29 ppm. The overall PAH distribution profiles appeared to be similar for leachate and groundwater dominated by 2??3 rings system molecules. While, the sediments profile was dominated by 4??6 rings system molecules which indicated the loss of low molecular weight compounds of PAH and accumulation of higher molecular weight of PAH under prevailing semiarid and hot climatic conditions.

Anwar Jiries; Omar Rimawi; Jutta Lintelmann; Mufeed Batarseh

2005-01-01T23:59:59.000Z

147

The landfill leachate evapotranspiration in soil??plant system with reed Phragmites australis  

Science Journals Connector (OSTI)

Using of the reed Phragmites australis is an effective method of landfill leachate disposal. In presented two years' study the effectiveness of leachate evapotranspiration from systems with reed was investigated. Daily evapotranspiration was in the range from 1.01 mm/d to 3.15 mm/d in the first year of research and from 2.68 mm/d to 4.94 mm/d in the second year. The research showed that the application of sewage sludge into the soil caused the increase in the vapourisation efficiency. Preliminary results of implemented soil-plant system with reed on landfill in Zakurzewo, Poland, showed that about 1100 m of leachate were evapotranspirated.

Andrzej Bialowiec; Irena Wojnowska-Baryla

2008-01-01T23:59:59.000Z

148

RCRA Groundwater Monitoring Plan for Single-Shell Tank Waste Management Area C at the Hanford Site, Interim Change Notice 4  

SciTech Connect (OSTI)

This ICN documents the installation of three additional downgradient monitoring wells and one additional upgradient well. It updates the monitoring network and the stratigraphy of the aquifer.

Narbutovskih, Susan M.

2004-10-07T23:59:59.000Z

149

Optimisation of sanitary landfill leachate treatment in a sequencing batch reactor  

E-Print Network [OSTI]

on artificial intelligence concepts. Nitrogen removal was optimized via the nitrite shortcut. Nitrification and N removal were usually higher than 98% and 90%, respectively, whereas COD (of the leachate) removal, in terms of phase length and external COD addition, to the varying loading conditions. Using the control

150

Metal Speciation in Landfill Leachates with a Focus on the Influence of Organic Matter  

SciTech Connect (OSTI)

This study characterizes the heavy-metal content in leachates collected from eight landfills in France. In order to identify heavy metal occurrence in the different size fractions of leachates, a cascade filtration protocol was applied directly in the field, under a nitrogen gas atmosphere to avoid metal oxidation. The results of analyses performed on the leachates suggest that most of the metals are concentrated in the <30 kDa fraction, while lead, copper and cadmium show an association with larger particles. Initial speciation calculations, without considering metal association with organic matter, suggest that leachate concentrations in lead, copper, nickel and zinc are super-saturated with respect to sulphur phases. Speciation calculations that account for metal complexation with organic matter, considered as fulvic acids based on C1(s) NEXAFS spectroscopy, show that this mechanism is not sufficient to explain such deviation from equilibrium conditions. It is therefore hypothesized that the deviation results also from the influence of biological activity on the kinetics of mineral phase precipitation and dissolution, thus providing a dynamic system. The results of chemical analyses of sampled fluids are compared with speciation calculations and some implications for the assessment of metal mobility and natural attenuation in a context of landfill risk assessment are discussed.

F Claret; C Tournassat; C Crouzet; E Gaucher; T Schfer; G Braibant; D Guyonnet

2011-12-31T23:59:59.000Z

151

Development of a Wireless Sensor Network for Monitoring a Bioreactor Landfill Asis Nasipuri,1  

E-Print Network [OSTI]

1 Development of a Wireless Sensor Network for Monitoring a Bioreactor Landfill Asis Nasipuri,1 treatment and disposal costs of leachate, and increasing landfill capacity. Such aerobic decomposition engineered containment structures i.e. landfilling. The goal of a conventional landfill (typically referred

Nasipuri, Asis

152

Metal speciation in landfill leachates with a focus on the influence of organic matter  

SciTech Connect (OSTI)

Highlights: > This study characterises the heavy-metal content in leachates collected from eight landfills in France. > Most of the metals are concentrated in the <30 kDa fraction, while Pb, Cu and Cd are associated with larger particles. > Metal complexation with OM is not sufficient to explain apparent supersaturation of metals with sulphide minerals. - Abstract: This study characterises the heavy-metal content in leachates collected from eight landfills in France. In order to identify heavy metal occurrence in the different size fractions of leachates, a cascade filtration protocol was applied directly in the field, under a nitrogen gas atmosphere to avoid metal oxidation. The results of analyses performed on the leachates suggest that most of the metals are concentrated in the <30 kDa fraction, while lead, copper and cadmium show an association with larger particles. Initial speciation calculations, without considering metal association with organic matter, suggest that leachate concentrations in lead, copper, nickel and zinc are super-saturated with respect to sulphur phases. Speciation calculations that account for metal complexation with organic matter, considered as fulvic acids based on C1(s) NEXAFS spectroscopy, show that this mechanism is not sufficient to explain such deviation from equilibrium conditions. It is therefore hypothesized that the deviation results also from the influence of biological activity on the kinetics of mineral phase precipitation and dissolution, thus providing a dynamic system. The results of chemical analyses of sampled fluids are compared with speciation calculations and some implications for the assessment of metal mobility and natural attenuation in a context of landfill risk assessment are discussed.

Claret, Francis, E-mail: f.claret@brgm.fr [BRGM, 3 avenue C. Guillemin, BP 6009, 45060 Orleans (France); Tournassat, Christophe; Crouzet, Catherine; Gaucher, Eric C. [BRGM, 3 avenue C. Guillemin, BP 6009, 45060 Orleans (France); Schaefer, Thorsten [Karlsruhe Institute of Technology (KIT), Institute for Nuclear Waste Disposal (INE), P.O. Box 3640, 76021 Karlsruhe (Germany); Freie Universitaet Berlin, Institute of Geological Sciences, Department of Earth Sciences, Hydrogeology Group, D-12249 Berlin (Germany); Braibant, Gilles; Guyonnet, Dominique [BRGM, 3 avenue C. Guillemin, BP 6009, 45060 Orleans (France)

2011-09-15T23:59:59.000Z

153

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

154

How does landfill leachate affect the chemical processes in a lake system downgradient from a landfill site?  

Science Journals Connector (OSTI)

A field study on the geochemical properties of a chemically-stressed limnic environment was performed in Lake Silbersee, which receives leachate water of high inorganic loading from an upgradient landfill site. T...

Thomas Striebel; Wolfgang Schfer; Stefan Peiffer

1991-01-01T23:59:59.000Z

155

Hydrogeological studies on the mechanical behavior of landfill gases and leachate of the Nanjido Landfill in Seoul, Korea  

Science Journals Connector (OSTI)

?The Nanjido Landfill is the largest uncontrolled landfill in Korea and it causes various kinds of environmental problems. Landfill gases and leachate are recognized as the most serious environmental problems ass...

K. K. Lee; Y. Y. Kim; H. W. Chang; S. Y. Chung

1997-06-01T23:59:59.000Z

156

Microsoft Word - Appendix J-LCRS-Train 3 Treament Contingency Plan1.doc  

Office of Legacy Management (LM)

February 2005 Second Draft Final Doc. No. S00790AG February 2005 Second Draft Final Doc. No. S00790AG Page I-3 I1.0 Purpose The purpose of this document is to provide information necessary for the proper operation and maintenance of the Leachate Collection and Removal System (LCRS). Specifically, the subsequent sections will provide the information relating to the management of leachate, maintenance and calibration of liquid level, general equipment maintenance, and reporting requirements. I2.0 Facility Description The LCRS facility is located at the north end of the disposal cell and consists of an 11,500-gallon horizontal below-grade pipe storage sump, four pipes from the disposal cell (east and west primary and east and west secondary) to convey the leachate to the sump, liquid level monitoring

157

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plan science-innovationassetsimagesicon-science.jpg Strategic Plan x Strategic Plan Los Alamos National Laboratory Strategic Plan - 2014 (pdf) Our Strategic Plan...

158

Carbonates and oxalates in sediments and landfill: monitors of death and decay in natural and artificial systems  

Science Journals Connector (OSTI)

...intermediate stage in the production of landfill gas and as a sink for ammonia as ammonium...waste are monitored by analysis of landfill gas and leachate. Gas compositional...years. Fig. 3. Evolution in landfill gas composition with time, showing...

DAVID A. C. MANNING

159

Soil attenuation of leachates from low-rank coal combustion wastes: a literature survey. [116 references  

SciTech Connect (OSTI)

In parallel with pursuing the goal of increased utilization of low-rank solid fuels, the US Department of Energy is investigating various aspects associated with the disposal of coal-combustion solid wastes. Concern has been expressed relative to the potential hazards presented by leachates from fly ash, bottom ash and scrubber wastes. This is of particular interest in some regions where disposal areas overlap aquifer recharge regions. The western regions of the United States are characterized by relatively dry alkaline soils which may effect substantial attenuation of contaminants in the leachates thereby reducing the pollution potential. A project has been initiated to study the contaminant uptake of western soils. This effort consists of two phases: (1) preparation of a state-of-the-art document on soil attenuation; and (2) laboratory experimental studies to characterize attenuation of a western soil. The state-of-the-art document, represented herein, presents the results of studies on the characteristics of selected wastes, reviews the suggested models which account for the uptake, discusses the specialized columnar laboratory studies on the interaction of leachates and soils, and gives an overview of characteristics of Texas and Wyoming soils. 116 references, 10 figures, 29 tables.

Gauntt, R. O.; DeOtte, R. E.; Slowey, J. F.; McFarland, A. R.

1984-01-01T23:59:59.000Z

160

Non-biodegradable landfill leachate treatment by combined process of agitation, coagulation, SBR and filtration  

SciTech Connect (OSTI)

Highlights: A novel method of stripping (agitation) was investigated for NH{sub 3}-N removal. PFS coagulation followed agitation process enhanced the leachate biodegradation. Nitrificationdenitrification achieved by changing operation process in SBR treatment. A dual filter of carbon-sand is suitable as a polishing treatment of leachate. Combined treatment success for the complete treatment of non-biodegradable leachate. - Abstract: This study describes the complete treatment of non-biodegradable landfill leachate by combined treatment processes. The processes consist of agitation as a novel stripping method used to overcome the ammonia toxicity regarding aerobic microorganisms. The NH{sub 3}-N removal ratio was 93.9% obtained at pH 11.5 and a gradient velocity (G) 150 s{sup ?1} within a five-hour agitation time. By poly ferric sulphate (PFS) coagulation followed the agitation process; chemical oxygen demand (COD) and biological oxygen demand (BOD{sub 5}) were removed at 70.6% and 49.4%, respectively at an optimum dose of 1200 mg L{sup ?1} at pH 5.0. The biodegradable ratio BOD{sub 5}/COD was improved from 0.18 to 0.31 during pretreatment step by agitation and PFS coagulation. Thereafter, the effluent was diluted with sewage at a different ratio before it was subjected to sequencing batch reactor (SBR) treatment. Up to 93.3% BOD{sub 5}, 95.5% COD and 98.1% NH{sub 3}-N removal were achieved by SBR operated under anoxicaerobicanoxic conditions. The filtration process was carried out using sand and carbon as a dual filter media as polishing process. The final effluent concentration of COD, BOD{sub 5}, suspended solid (SS), NH{sub 3}-N and total organic carbon (TOC) were 72.4 mg L{sup ?1}, 22.8 mg L{sup ?1}, 24.2 mg L{sup ?1}, 18.4 mg L{sup ?1} and 50.8 mg L{sup ?1} respectively, which met the discharge standard. The results indicated that a combined process of agitation-coagulation-SBR and filtration effectively eliminated pollutant loading from landfill leachate.

Abood, Alkhafaji R. [State Key Laboratory of Biogeology and Environmental Geology, China University of Geosciences, Wuhan 430074 (China); Thi Qar University, Nasiriyah (Iraq); Bao, Jianguo, E-mail: bjianguo888@126.com [State Key Laboratory of Biogeology and Environmental Geology, China University of Geosciences, Wuhan 430074 (China); Du, Jiangkun; Zheng, Dan; Luo, Ye [State Key Laboratory of Biogeology and Environmental Geology, China University of Geosciences, Wuhan 430074 (China)

2014-02-15T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

SUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505  

E-Print Network [OSTI]

to pay for such coverage. Review this summary plan description and the documents governing the planSUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505] Plan Type: Group Vision Insurance Plan Year: July 1 ­ June 30 Employer\\Policyholder\\Plan Administrator\\Plan Sponsor: Medical College

162

SciTech Connect: Nuclear Explosion Monitoring Research and Engineering...  

Office of Scientific and Technical Information (OSTI)

Program Document: Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan Citation Details In-Document Search Title: Nuclear Explosion Monitoring Research...

163

Leachate treatment system using constructed wetlands, Town of Fenton sanitary landfill, Broome County, New York. Final report  

SciTech Connect (OSTI)

Municipal sanitary landfills generate leachate that New York State regulations require to be collected and treated to avoid contaminating surface water and groundwater. One option for treating leachate is to haul it to municipal wastewater treatment facility. This option may be expensive, may require excessive energy for transportation, and may require pretreatment to protect the receiving facility`s processes. An alternative is on-site treatment and discharge. Personnel from the Town of Fenton, New York; Hawk Engineering, P.C.; Cornell University; and Ithaca College designed, built, and operated a pilot constructed wetland for treating leachate at the Town of Fenton`s municipal landfill. The system, consisting of two overland flow beds and two subsurface flow beds has been effective for 18 months in reducing levels of ammonia (averaging 85% removal by volatilization and denitrification) and total iron (averaging 95% removal by precipitation and sedimentation), two key constituents of the Fenton landfill`s leachate. The system effects these reductions with zero chemical and energy inputs and minimal maintenance. A third key constituent of the leachate, manganese, apparently passes through the beds with minimal removal. Details and wetland considerations are described.

Not Available

1993-11-01T23:59:59.000Z

164

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

165

2030 Transportation and Mobility Plan  

E-Print Network [OSTI]

sections are as follows: 1. Introduction 2. Bi-State MPO Area Description 3. Planning Horizon Description and Data Projections 4. Long Range Plan Presentation 5. Plan Implementation and Monitoring Procedures 6. Bi-State MPO 2030 Transportation..., improved access at the Leigh Avenue/I-540 interchange, and the deployment of appropriate Intelligent Transportation Systems (ITS) projects. The Airport Master Plan Update has estimated a total airport improvement cost of $ 74,170,000 over a Three (3...

Bi-State Metropolitan Planning Organization

2006-08-11T23:59:59.000Z

166

SITE MAINTENANCE PLAN CSMRI SITE REMEDIATION  

E-Print Network [OSTI]

...............................................................................................................5 5.2 Ground and Surface Water MonitoringSITE MAINTENANCE PLAN CSMRI SITE REMEDIATION June 29, 2004 Prepared by: Colorado School of Mines .................................................................................................4 5.0 SITE AIR AND WATER MONITORING

167

On-Site Pilot Study - Removal of Uranium, Radium-226 and Arsenic from Impacted Leachate by Reverse Osmosis - 13155  

SciTech Connect (OSTI)

Conestoga-Rovers and Associates (CRA-LTD) performed an on-site pilot study at the Welcome Waste Management Facility in Port Hope, Ontario, Canada, to evaluate the effectiveness of a unique leachate treatment process for the removal of radioactive contaminants from leachate impacted by low-level radioactive waste. Results from the study also provided the parameters needed for the design of the CRA-LTD full scale leachate treatment process design. The final effluent water quality discharged from the process to meet the local surface water discharge criteria. A statistical software package was utilized to obtain the analysis of variance (ANOVA) for the results from design of experiment applied to determine the effect of the evaluated factors on the measured responses. The factors considered in the study were: percent of reverse osmosis permeate water recovery, influent coagulant dosage, and influent total dissolved solids (TDS) dosage. The measured responses evaluated were: operating time, average specific flux, and rejection of radioactive contaminants along with other elements. The ANOVA for the design of experiment results revealed that the operating time is affected by the percent water recovery to be achieved and the flocculant dosage over the range studied. The average specific flux and rejection for the radioactive contaminants were not affected by the factors evaluated over the range studied. The 3 month long on-site pilot testing on the impacted leachate revealed that the CRA-LTD leachate treatment process was robust and produced an effluent water quality that met the surface water discharge criteria mandated by the Canadian Nuclear Safety Commission and the local municipality. (authors)

McMurray, Allan; Everest, Chris; Rilling, Ken [Conestoga-Rovers and Associates, 651 Colby Dr, Waterloo, ON (Canada)] [Conestoga-Rovers and Associates, 651 Colby Dr, Waterloo, ON (Canada); Vandergaast, Gary [Atomic Energy of Canada Ltd, 115 Toronto Road, Port Hope, ON (Canada)] [Atomic Energy of Canada Ltd, 115 Toronto Road, Port Hope, ON (Canada); LaMonica, David [RoChem Membrane Systems Inc., 430 30th Street, Hermosa Beach, CA (United States)] [RoChem Membrane Systems Inc., 430 30th Street, Hermosa Beach, CA (United States)

2013-07-01T23:59:59.000Z

168

MOBILIZATION AND CHARACTERIZATION OF COLLOIDS GENERATED FROM CEMENT LEACHATES MOVING THROUGH A SRS SANDY SEDIMENT  

SciTech Connect (OSTI)

Naturally occurring mobile colloids are ubiquitous and are involved in many important processes in the subsurface zone. For example, colloid generation and subsequent mobilization represent a possible mechanism for the transport of contaminants including radionuclides in the subsurface environments. For colloid-facilitated transport to be significant, three criteria must be met: (1) colloids must be generated; (2) contaminants must associate with the colloids preferentially to the immobile solid phase (aquifer); and (3) colloids must be transported through the groundwater or in subsurface environments - once these colloids start moving they become 'mobile colloids'. Although some experimental investigations of particle release in natural porous media have been conducted, the detailed mechanisms of release and re-deposition of colloidal particles within natural porous media are poorly understood. Even though this vector of transport is known, the extent of its importance is not known yet. Colloid-facilitated transport of trace radionuclides has been observed in the field, thus demonstrating a possible radiological risk associated with the colloids. The objective of this study was to determine if cementitious leachate would promote the in situ mobilization of natural colloidal particles from a SRS sandy sediment. The intent was to determine whether cementitious surface or subsurface structure would create plumes that could produce conditions conducive to sediment dispersion and mobile colloid generation. Column studies were conducted and the cation chemistries of influents and effluents were analyzed by ICP-OES, while the mobilized colloids were characterized using XRD, SEM, EDX, PSD and Zeta potential. The mobilization mechanisms of colloids in a SRS sandy sediment by cement leachates were studied.

Li, D.; Roberts, K.; Kaplan, D.; Seaman, J.

2011-09-20T23:59:59.000Z

169

Natural Resource Management Plan Update  

E-Print Network [OSTI]

Natural Resource Management Plan Update Tim Green Environmental Protection Division Community. Cultural Resources) · Focus on gaining better understanding of site resources · Began or continued managing · Monitoring layers · Cultural Resources ­ WW I, WW II, CCC GIS used for planning ­ NSLS II, LISF, Permits, etc

Homes, Christopher C.

170

Monitoring materials  

DOE Patents [OSTI]

The apparatus and method provide techniques for effectively implementing alpha and/or beta and/or gamma monitoring of items or locations as desired. Indirect alpha monitoring by detecting ions generated by alpha emissions, in conjunction with beta and/or gamma monitoring is provided. The invention additionally provides for screening of items prior to alpha monitoring using beta and/or gamma monitoring, so as to ensure that the alpha monitoring apparatus is not contaminated by proceeding direct to alpha monitoring of a heavily contaminated item or location. The invention provides additional versatility in the emission forms which can be monitored, whilst maintaining accuracy and avoiding inadvertent contamination.

Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

2002-01-01T23:59:59.000Z

171

Performance Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Optimization Performance Monitoring Performance Monitoring A redirector page has been set up without anywhere to redirect to. Last edited: 2014-08-25 14:37:27...

172

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

173

STRATEGIC PLAN  

Energy Savers [EERE]

STRATEGIC PLAN 2015 - 2018 Message from the Associate Under Secretary for Environment, Health, Safety and Security I am proud to introduce this strategic plan for the Office of...

174

UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN  

E-Print Network [OSTI]

UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision.0 Monitoring & Review 15 #12;UCL ASBESTOS MANAGEMENT PLAN Revision 6 Page 3 of 16 POLICY STATEMENT UCL Estates of Asbestos Regulations 2006 Peter Harrison HSMT 3 30-07-10 Revised to merge policy and plan and provide

Saunders, Mark

175

Nucleosynthetic osmium isotope anomalies in acid leachates of the Murchison meteorite  

E-Print Network [OSTI]

We present osmium isotopic results obtained by sequential leaching of the Murchison meteorite, which reveal the existence of very large internal anomalies of nucleosynthetic origin. The Os isotopic anomalies are correlated, and can be explained by the variable contributions of components derived from the s, r and p-processes of nucleosynthesis. Much of the s-process rich osmium is released by relatively mild leaching, suggesting the existence of an easily leachable s-process rich presolar phase, or alternatively, of a chemically resistant r-process rich phase. The s-process composition of Os released by mild leaching diverges slightly from that released by aggressive digestion techniques, perhaps suggesting that the presolar phases attacked by these differing procedures condensed in different stellar environments. The correlation between 190Os and 188Os can be used to constrain the s-process 190Os/188Os ratio to be 1.275 pm 0.043. Such a ratio can be reproduced in a nuclear reaction network for a MACS value for 190Os of ~200 pm 22 mbarn at 30 keV. We also present evidence for extensive internal variation of 184Os abundances in the Murchison meteorite. This suggests that p process rich presolar grains (e.g., supernova condensates) may be present in meteorites in sufficient quantities to influence the Os isotopic compositions of the leachates.

L. Reisberg; N. Dauphas; A. Luguet; D. G. Pearson; R. Gallino; C. Zimmermann

2008-12-15T23:59:59.000Z

176

Determination of long-lived actinides in soil leachates by inductively coupled plasma: Mass spectrometry  

SciTech Connect (OSTI)

Inductively coupled plasma -- mass spectrometry (ICP-MS) was used to concurrently determine multiple long-lived (t{sub 1/2} > 10{sup 4} y) actinide isotopes in soil samples. Ultrasonic nebulization was found to maximize instrument sensitivity. Instrument detection limits for actinides in solution ranged from 50 mBq L{sup {minus}1} ({sup 239}Pu) to 2 {mu}Bq L{sup {minus}1} ({sup 235}U) Hydride adducts of {sup 232}Th and {sup 238}U interfered with the determinations of {sup 233}U and {sup 239} Pu; thus, extraction chromatography was, used to eliminate the sample matrix, concentrate the analytes, and separate uranium from the other actinides. Alpha spectrometric determinations of {sup 230}Th, {sup 239}Pu, and the {sup 234}U/{sup 238}U activity ratio in soil leachates compared well with ICP-MS determinations; however, there were some small systematic differences (ca. 10%) between ICP-MS and a-spectrometric determinations of {sup 234}U and {sup 238}U activities.

Crain, J.S.; Smith, L.L.; Yaeger, J.S.; Alvarado, J.A.

1994-06-01T23:59:59.000Z

177

Case study of landfill leachate recirculation using small-diameter vertical wells  

Science Journals Connector (OSTI)

Abstract A case study of landfill liquids addition using small diameter (5cm) vertical wells is reported. More than 25,000m3 of leachate was added via 134 vertical wells installed 3m, 12m, and 18m deep over five years in a landfill in Florida, US. Liquids addition performance (flow rate per unit screen length per unit liquid head) ranged from 5.6נ10?8 to 3.6נ10?6m3s?1 per m screen length per m liquid head. The estimated radial hydraulic conductivity ranged from 3.5נ10?6 to 4.2נ10?4ms?1. The extent of lateral moisture movement ranged from 8 to 10m based on the responses of moisture sensors installed around vertical well clusters, and surface seeps were found to limit the achievable liquids addition rates, despite the use of concrete collars under a pressurized liquids addition scenario. The average moisture content before (51 samples) and after (272 samples) the recirculation experiments were 23% (wet weight basis) and 45% (wet weight basis), respectively, and biochemical methane potential measurements of excavated waste indicated significant (p<0.025) decomposition.

Pradeep Jain; Jae Hac Ko; Dinesh Kumar; Jon Powell; Hwidong Kim; Lizmarie Maldonado; Timothy Townsend; Debra R. Reinhart

2014-01-01T23:59:59.000Z

178

CEMs turn monitoring giant  

SciTech Connect (OSTI)

Crucial to complying with environmental regulations is selecting appropriate pollution control equipment to capture or destroy regulated pollutants. But just as important is selecting a continuous emissions monitoring system (CEM). CEMs play a dual role in an overall compliance strategy. On one hand, they identify the type and quantity of emissions at a source as a first step for determining which regulatory requirements and control technologies are applicable. They also provide ongoing emissions data to demonstrate compliance with air and other environmental regulations. Facilities are required to monitor their processes with CEMs, or a comparable technology, under several titles of the Clean Air Act Amendments of 1990. CEMs meet regulatory requirements if they include a SO[sub 2] concentration monitor, nitrogen oxides (NO[sub x]) concentration monitor, volumetric flow monitor, opacity monitor, diluent gas monitor and data acquisition and handling system. The entire system and each subsystem has to be installed and certified before it can be used for compliance. A written quality assurance/quality control (QA/QC) plan for the CEMs must accompany the permit application. The acid rain rules also impose performance standards and frequent calibration checks to ensure the integrity of CEMs data.

White, J.R. (KVB/Analect, Irvine, CA (United States))

1993-08-01T23:59:59.000Z

179

Independent Scientific Review Panel for the Northwest Power Planning Council  

E-Print Network [OSTI]

Independent Scientific Review Panel for the Northwest Power Planning Council 851 SW 6 th Avenue Planning Council Members FROM: Rick Williams, ISRP Chair RE: ISRP Review of the Draft Monitoring revision of the monitoring and evaluation (M&E) component of the plan. From the review of the document

180

Microsoft Word - Vol II_Att C.doc  

Office of Legacy Management (LM)

6.0-Final Attachment C-Groundwater/Leak Detection and Leachate Monitoring Plan 6.0-Final Attachment C-Groundwater/Leak Detection and Leachate Monitoring Plan January 2013 Page i Contents Acronyms and Abbreviations ........................................................................................................ iii 1.0 Introduction ...................................................................................................................... 1-1 1.1 Overview of the OSDF .......................................................................................... 1-2 1.2 Program Overview ................................................................................................. 1-5 1.3 Plan Organization .................................................................................................. 1-6

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Laboratory measurements of contaminant attenuation of uranium mill tailings leachates by sediments and clay liners  

SciTech Connect (OSTI)

We discuss FY82 progress on the development of laboratory tools to aid in the prediction of migration potential of contaminants present in acidic uranium mill tailings leachate. Further, empirical data on trace metal and radionuclide migration through a clay liner are presented. Acidic uranium mill tailings solution from a Wyoming mill was percolated through a composite sediment called Morton Ranch Clay liner. These laboratory columns and subsequent sediment extraction data show: (1) As, Cr, Pb, Ag, Th and V migrate very slowly; (2) U, Cd, Ni, Zn, Fe, Mn and similar transition metals are initially immobilized during acid neutralization but later are remobilized as the tailings solution exhausts the clay liner's acid buffering capacity. Such metals remain immobilized as long as the effluent pH remains above a pH value of 4 to 4.5, but they become mobile once the effluent pH drops below this range; and (3) fractions of the Se and Mo present in the influent tailings solution are very mobile. Possible controlling mechanisms for the pH-dependent immobilization-mobilization of the trace metals are discussed. More study is required to understand the controlling mechanisms for Se and Mo and Ra for which data were not successfully collected. Using several column lengths (from 4.5 to 65 cm) and pore volume residence times (from 0.8 to 40 days) we found no significant differences in contaminant migration rates or types and extent of controlling processes. Thus, we conclude that the laboratory results may be capable of extrapolation to actual disposal site conditions.

Serne, R.J.; Peterson, S.R.; Gee, G.W.

1983-04-01T23:59:59.000Z

182

Study of colloidal content and associated heavy metals in landfill leachate: a case study of El-Akader landfill site: Jordan  

Science Journals Connector (OSTI)

Landfill leachate samples were collected anaerobically at six locations at the El-Akader landfill site in North Jordan. The collected leachate samples were separated into size fractions with special attention to the distribution of colloids and associated heavy metals. The fraction sizes were 1.2 µm. The maximum concentrations of heavy metals in the analysed leachate samples were Cd 0.6 µg/l, Ni 25 µg/l, Zn 245 µg/l, Cu 15 µg/l and Pb 2.50 µg/l. In the dissolved particular matter the heavy metals concentration ranges were Cd 0.1??1.1 µg/l, Ni 0.35??1.5 µg/l, Zn 85??105 µg/l, Cu 0??0.95 µg/l and Pb 0.5??2.5 µg/l.

Y. Abu-Rukah

2005-01-01T23:59:59.000Z

183

Coeur d'Alene Tribe Fisheries Program Research, Monitoring and Evaluation Plan; Implementation of Fisheries Enhancement Opportunities on the Coeur d'Alene Reservation, 1997-2002 Technical Report.  

SciTech Connect (OSTI)

Westslope cutthroat trout (Oncorhynchus clarki lewisi) and bull trout (Salvelinus confluentus) are currently of special concern regionally and are important to the culture and subsistence needs of the Coeur d'Alene Tribe. The mission of the Coeur d'Alene Tribe Fisheries Program is to restore and maintain these native trout and the habitats that sustain them in order to provide subsistence harvest and recreational fishing opportunities for the Reservation community. The adfluvial life history strategy exhibited by westslope cutthroat and bull trout in the Lake Coeur d'Alene subbasin makes these fish susceptible to habitat degradation and competition in both lake and stream environments. Degraded habitat in Lake Coeur d'Alene and its associated streams and the introduction of exotic species has lead to the decline of westslope cutthroat and listing of bull trout under the endangered species act (Peters et al. 1998). Despite the effects of habitat degradation, several streams on the Reservation still maintain populations of westslope cutthroat trout, albeit in a suppressed condition (Table 1). The results of several early studies looking at fish population status and habitat condition on the Reservation (Graves et al. 1990; Lillengreen et al. 1993, 1996) lead the Tribe to aggressively pursue funding for habitat restoration under the Northwest Power Planning Council's (NWPPC) resident fish substitution program. Through these efforts, habitat restoration needs were identified and projects were initiated. The Coeur d'Alene Tribe Fisheries Program is currently involved in implementing stream habitat restoration projects, reducing the transport of sediment from upland sources, and monitoring fish populations in four watersheds on the Coeur d'Alene Reservation (Figure 1). Restoration projects have included riparian plantings, addition of large woody debris to streams, and complete channel reconstruction to restore historical natural channel forms. In addition, ponds have been constructed to trap sediment from rill and gully erosion associated with agricultural practices, and to provide flow enhancement and ameliorate elevated stream temperatures during the summer base flow period. The implementation of restoration efforts that target the key habitats and lifestages for resident westslope cutthroat trout on the Coeur d'Alene Reservation is one means the Tribe is using to partially mitigate for lost anadromous fisheries. In this context, restoration is consistent with the definition provided by Ebersole et al. (1997), who described stream restoration as the reexpression of habitat capacity in a stream system. At the reach scale, habitat capacity is affected by biotic (e.g., riparian vegetation) and physical (e.g., flooding) processes. Superimposed on the natural biotic and physical processes are anthropogenic stressors (e.g., logging, roads and grazing) that suppress habitat capacity and can result in simplified, degraded stream reaches. The effectiveness of habitat restoration, measured as an increase in native trout abundance, is dependent on reducing limiting factors (e.g., passage barriers, high water temperatures, sediment transport from source areas) in areas that are critical for spawning and rearing lifestages. This plan outlines a monitoring strategy to help determine the effectiveness of specific restoration/enhancement treatments and to track the status of trout populations in four target watersheds.

Vitale, Angelo; Lamb, Dave; Peters, Ronald

2002-11-01T23:59:59.000Z

184

Environmental Monitoring Plan for Unbound Engineered Nanoparticles  

E-Print Network [OSTI]

High-Efficiency Particulate Air ICP Inductively Coupled Plasma IHG Industrial Hygiene Group ISM ............................................................................................ 21 #12;v Acronyms BEA Baseline Exposure Assessment CPC Condensation Particle Counter CNT Carbon

Eisen, Michael

185

Groundwater Monitoring Well Installation Work Plan  

E-Print Network [OSTI]

.................................................................................................... 9 4.4 Environmental Management System...................................................................................................................... 1 1.2.1 Water Quality...................................................................................................... 7 3.6 Source of Water

186

MITIGATION ACTION PLAN  

Broader source: Energy.gov (indexed) [DOE]

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

187

CEBAF - environmental protection program plan  

SciTech Connect (OSTI)

An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

NONE

1995-10-01T23:59:59.000Z

188

Oxidation-induced geochemical changes in trench leachates from the Maxey Flats low-level radioactive waste disposal site  

SciTech Connect (OSTI)

A knowledge of extra-trench processes related to oxidation-induced geochemical changes that are likely to occur when iron-rich, anoxic trench waters encounter an oxidizing environment along a redox gradient is essential for modeling radionuclide transport at low-level waste (LLW) disposal sites. The results of laboratory oxidation experiments on several trench leachates from the Maxey Flats site show that, upon oxidation, a series of geochemical changes were initiated that resulted in a drastically different solute geochemistry, involving oxidation of ferrous iron and subsequent precipitation of ferric oxyhydroxide, changes in alkalinity and acidity, a drastic increase in redox potential (Eh), and generally relatively little change in the concentrations of /sup 60/Co, /sup 137/Cs, and /sup 85/Sr in solution. The observations made in this study have important geochemical implications for the modeling of LLW sites in that the source term as an input parameter cannot be assumed to be constant, both spatially and temporally. The acid-generating potential and buffering capacity of an anoxic source term are important geochemical controls that maintain a balance between acidity and alkalinity and largely determine the nature and extent of oxidation-induced geochemical changes likely to occur along a redox gradient. The presence of organic chelating agents can alter the source term geochemistry to such an extent that authigenic ferric oxyhydroxide, which represents a geochemical discontinuity at the redox interface along leachate migration paths, proves to be a relatively ineffective sink for radionuclides.

Dayal, R.; Pietrzak, R.F.; Clinton, J.H.

1986-02-01T23:59:59.000Z

189

Monitoring: The missing piece  

SciTech Connect (OSTI)

The U.S. National Environmental Policy Act (NEPA) of 1969 heralded in an era of more robust attention to environmental impacts resulting from larger scale federal projects. The number of other countries that have adopted NEPA's framework is evidence of the appeal of this type of environmental legislation. Mandates to review environmental impacts, identify alternatives, and provide mitigation plans before commencement of the project are at the heart of NEPA. Such project reviews have resulted in the development of a vast number of reports and large volumes of project-specific data that potentially can be used to better understand the components and processes of the natural environment and provide guidance for improved and efficient environmental protection. However, the environmental assessment (EA) or the more robust and intensive environmental impact statement (EIS) that are required for most major projects more frequently than not are developed to satisfy the procedural aspects of the NEPA legislation while they fail to provide the needed guidance for improved decision-making. While NEPA legislation recommends monitoring of project activities, this activity is not mandated, and in those situations where it has been incorporated, the monitoring showed that the EIS was inaccurate in direction and/or magnitude of the impact. Many reviews of NEPA have suggested that monitoring all project phases, from the design through the decommissioning, should be incorporated. Information gathered though a well-developed monitoring program can be managed in databases and benefit not only the specific project but would provide guidance how to better design and implement future activities designed to protect and enhance the natural environment. -- Highlights: NEPA statutes created profound environmental protection legislative framework. Contrary to intent, NEPA does not provide for definitive project monitoring. Robust project monitoring is essential for enhanced environmental management. Adaptive database framework is needed to accommodate project-monitoring data.

Bjorkland, Ronald, E-mail: r_bjorkland@hotmail.com

2013-11-15T23:59:59.000Z

190

Effects of Leachate from Crumb Rubber and Zinc in Green Roofs on the Survival, Growth, and Resistance Characteristics of Salmonella enterica subsp. enterica Serovar Typhimurium  

Science Journals Connector (OSTI)

...Leachate from Crumb Rubber and Zinc in Green Roofs on the Survival, Growth, and Resistance...Resources, Dover, Delaware, USA. The use of green roofs is a growing practice worldwide...into artificial medium for plant growth in green roofs and similar engineered environments...

Mollee Crampton; Allayna Ryan; Cori Eckert; Katherine H. Baker; Diane S. Herson

2014-02-28T23:59:59.000Z

191

Ion Monitoring  

DOE Patents [OSTI]

The apparatus and method provide a technique for significantly reducing capacitance effects in detector electrodes arising due to movement of the instrument relative to the item/location being monitored in ion detection based techniques. The capacitance variations are rendered less significant by placing an electrically conducting element between the detector electrodes and the monitored location/item. Improved sensitivity and reduced noise signals arise as a result. The technique also provides apparatus and method suitable for monitoring elongate items which are unsuited to complete enclosure in one go within a chamber. The items are monitored part by part as the pass through the instrument, so increasing the range of items or locations which can be successfully monitored.

Orr, Christopher Henry (Calderbridge, GB); Luff, Craig Janson (Calderbridge, GB); Dockray, Thomas (Calderbridge, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

2003-11-18T23:59:59.000Z

192

Background Information for the Nevada National Security Site Integrated Sampling Plan, Revision 0  

SciTech Connect (OSTI)

This document describes the process followed to develop the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan). It provides the Plans purpose and objectives, and briefly describes the Underground Test Area (UGTA) Activity, including the conceptual model and regulatory requirements as they pertain to groundwater sampling. Background information on other NNSS groundwater monitoring programsthe Routine Radiological Environmental Monitoring Plan (RREMP) and Community Environmental Monitoring Program (CEMP)and their integration with the Plan are presented. Descriptions of the evaluations, comments, and responses of two Sampling Plan topical committees are also included.

Farnham, Irene; Marutzky, Sam

2014-12-01T23:59:59.000Z

193

Task Plans  

Broader source: Energy.gov (indexed) [DOE]

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

194

Performance Confirmation Plan  

SciTech Connect (OSTI)

As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program.

Lindner, E.N.

2000-05-19T23:59:59.000Z

195

An optimized international vehicle monitor  

SciTech Connect (OSTI)

The security plans for many DOE facilities require the monitoring of pedestrians and vehicles to control the movement of special nuclear material (SNM). Vehicle monitors often provide the outer-most barrier against the theft of SNM. Automatic monitors determine the presence of SNM by comparing the gamma-ray and neutron intensity while occupied, to the continuously updated background radiation level which is measured while the unit is unoccupied. The most important factors in choosing automatic vehicle monitors are sensitivity, cost and in high traffic applications total monitoring time. The two types of automatic vehicle monitors presently in use are the vehicle monitoring station and the drive-through vehicle monitor. These two types have dramatically different cost and sensitivities. The vehicle monitoring station has a worst-case detection sensitivity of 40 g of highly enriched uranium, HEU, and a cost approximately $180k. This type of monitor is very difficult to install and can only be used in low traffic flow locations. The drive-through vehicle portal has a worst-case detection sensitivity of 1 kg of HEU and a cost approximately $20k. The world`s political situation has created a pressing need to prevent the diversion of SNM from FSU nuclear facilities and across international borders. Drive-through vehicle monitors would be an effective and practical nuclear material proliferation deterrent if their sensitivity can be improved to a sufficient level. The goal of this project is to evaluate different detector configurations as a means of improving the sensitivity of these instruments to achieve a vehicle monitor that is economical, practical to install, and has adequate sensitivity to be an effective barrier to illegal transportation of SNM.

York, R.L.; Close, D.A.; Fehlau, P.E.

1997-03-01T23:59:59.000Z

196

Geothermal progress monitor  

SciTech Connect (OSTI)

The Geothermal Progress Monitor is sponsored by the Division of Geothermal Energy/Resource Applications, DOE, to assemble the important facts about geothermal development activities in the United States in order to assess the pace of the development of this alternative energy source. The initial emphasis for the monitoring effort has been placed on the detection and analysis of important and simple indicators of what the main participants in geothermal energy utilization - field developers, energy users, and governments - are doing to foster the discovery, confirmation, and especially the use of this resource. The major indicators currently considered to be both important and measurable, are leasing activites, drilling effort, feasibility studies, construction plans and progress, costs of installations, levels of investment, environmental study and regulatory and legislative status of events, and government monetary investments in projects and activities. Additional indicators may be pursued in the future, depending on specific needs for or opportunities to capture relevant data and facts.

Lopez, A.F.; Entingh, D.J.; Neham, E.A.

1980-09-01T23:59:59.000Z

197

Ongoing monitoring and verification in Iraq  

SciTech Connect (OSTI)

When Iraq informed the United Nations last November 26 that it would cooperate in implementing the plans to monitor compliance with its obligations not to reacquire weapons banned under the ceasefire agreements following the Gulf War, it signalled an apparent policy reversal after two years of difficulties, deadlocks and limited cooperation. While claiming never to have rejected the plans to implement nationwide monitoring and inspections to prevent the import or manufacture of nuclear, chemical and biological weapons and long-range ballistic missiles, Iraq consistently spoke of the plans in terms of political, if not legal, rejection.

Trevan, T.

1994-05-01T23:59:59.000Z

198

Electrostatic monitoring  

DOE Patents [OSTI]

The apparatus and method provide a technique for more simply measuring alpha and/or beta emissions arising from items or locations. The technique uses indirect monitoring of the emissions by detecting ions generated by the emissions, the ions being attracted electrostatically to electrodes for discharge of collection. The apparatus and method employ a chamber which is sealed around the item or location during monitoring with no air being drawn into or expelled from the chamber during the monitoring process. A simplified structure and operations arises as a result, but without impairing the efficiency and accuracy of the detection technique.

Orr, Christopher Henry (Cumbria, GB); Luff, Craig Janson (Cumbria, GB); Dockray, Thomas (Cumbria, GB); Macarthur, Duncan Whittemore (Los Alamos, NM)

2001-01-01T23:59:59.000Z

199

Seismic Monitoring - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Curation Services Ecological Monitoring Environmental Surveillance Meteorology and Climatology Services Seismic Monitoring Seismic Monitoring Email Email Page | Print Print Page...

200

Sample Project Execution Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Sample Project Execution Plan Sample Project Execution Plan Sample Project Execution Plan The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects. The plan serves as the main communication vehicle to ensure that everyone is aware and knowledgeable of project objectives and how they will be accomplished. The plan is the primary agreement between Headquarters and the federal project director and a preliminary plan should be developed and approved at Critical Decision-1. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. The plan is a living document and should be updated to describe current and future processes and procedures, such as integrating safety

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Weld Monitor  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring of Laser Beam Welding Monitoring of Laser Beam Welding Using Infrared Weld Emissions P. G. Sanders, J. S. Keske, G. Kornecki, and K. H. Leong Technology Development Division Argonne National Laboratory Argonne, IL 60439 USA The submitted manuscript has been authorized by a contractor of the U. S. Government under contract No. W-31-109-ENG-38. Accordingly, the U. S. Government retains a non-exclusive, royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for U. S. Government purposes. Abstract A non-obtrusive, pre-aligned, solid-state device has been developed to monitor the primary infrared emissions during laser welding. The weld monitor output is a 100-1000 mV signal that depends on the beam power and weld characteristics. The DC level of this signal is related to weld

202

Environmental Monitoring  

Science Journals Connector (OSTI)

Cell processing facilities should implement and maintain a program of environmental monitoring regardless of whether product manufacturing occurs in an unclassified laboratory space or in a Class 10,000 cleanroom

A. Gee MI Biol; PhD; D.L. Lyon MT (ASCP); CLSp (MB)

2009-01-01T23:59:59.000Z

203

August 25, 2011 Clinical Trials Monitoring Assistance Program for FDA Regulated Human Subjects Research  

E-Print Network [OSTI]

, mandatory review of evidence that an appropriate monitoring plan is being implemented and documented with the protocol, standard operating procedures (SOPs), GCP, and the applicable regulatory requirement(s)." (ICH E6 design and development of a monitoring plan and strategies for the implementation of the plan. S

Grishok, Alla

204

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado: Appendix B to Attachment 3, Lithologic logs and monitor well construction information. Final report  

SciTech Connect (OSTI)

This volume contains lithology logs and monitor well construction information for: NC processing site; UC processing site; and Burro Canyon disposal site. This information pertains to the ground water hydrology investigations which is attachment 3 of this series of reports.

NONE

1995-09-01T23:59:59.000Z

205

Monitoring Infrastructure Capacity Monitoring Infrastructure Capacity  

E-Print Network [OSTI]

Levinson, D. (2000) Monitoring Infrastructure Capacity p. 165-181 in Land Market Monitoring for Smart Urban) task. Monitoring infrastructure capacity is at least as complex as monitoring urban land markets Levinson, D. (2000) Monitoring Infrastructure Capacity p. 165-181 in Land Market Monitoring for Smart Urban

Levinson, David M.

206

Restoration Monitoring-A Simple Photo Monitoring Method | Department...  

Energy Savers [EERE]

Restoration Monitoring-A Simple Photo Monitoring Method Restoration Monitoring-A Simple Photo Monitoring Method Restoration Monitoring-A Simple Photo Monitoring Method Restoration...

207

PDSF Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PDSF Monitoring PDSF Monitoring The plot below is a measure of the read and write rates a single user would experience via the PDSF batch system. Jobs are submitted sequentially every hour to the debug queue. If a jobs doesn't finish in 8 minutes, it is killed and a -1 rate is written out. The read rates are calculated by copying a directory containing 2 files totaling 274 MB from the eliza directories to the $TMPDIR on the node running the job. The write rates are calculated by untarring a tarball on the eliza directories. The write rates are typically around a factor of two slower than the read rates, because the data still has to travel to the compute node and then back to the eliza for writing. The I/O rates are taken from the ganglia monitoring and serve as a measure of the amount of

208

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network [OSTI]

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

209

Proactive Planning  

E-Print Network [OSTI]

, rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

Wythe, Kathy

2008-01-01T23:59:59.000Z

210

CFN Ops Plan | Work Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

211

Load Allocation Through Detailed Simulation Calibrated with Monitored Data  

E-Print Network [OSTI]

, the only solution would be to monitor the energy channels within the buildings (monitoring the main building meters as a minimum). A real problem that is often associated with institutional buildings (university and hospital campuses) is that two... answer to the load allocation can only be answered by monitoring every energy channel in the building which proves to be very costly. A cost-effective solution was used where the monitoring plan covers the main three meters in the building under...

Abushakra, B.

2005-01-01T23:59:59.000Z

212

SCOTTISH RED SQUIRREL ACTION PLAN  

E-Print Network [OSTI]

SCOTTISH RED SQUIRREL ACTION PLAN 2006­2011 #12;#12;S C O T T I S H R E D S Q U I R R E L A C T I O.1 Background 1 1.2 Action Plan Working Group 1 1.3 Issues affecting the conservation of the red squirrel 1 1.2 Timescale and partnership working 3 2.3 Rationale 3 2.4 Key actions 4 2.4.1 Establish and monitor the red

213

Tritium monitor  

DOE Patents [OSTI]

A system is described for continuously monitoring the concentration of tritium in an aqueous stream. The system pumps a sample of the stream to magnesium-filled combustion tube which reduces the sample to extract hydrogen gas. The hydrogen gas is then sent to an isotope separation device where it is separated into two groups of isotopes: a first group of isotopes containing concentrations of deuterium and tritium, and a second group of isotopes having substantially no deuterium and tritium. The first group of isotopes containing concentrations of deuterium and tritium is then passed through a tritium detector that produces an output proportional to the concentration of tritium detected. Preferably, the detection system also includes the necessary automation and data collection equipment and instrumentation for continuously monitoring an aqueous stream. 1 fig.

Chastagner, P.

1994-06-14T23:59:59.000Z

214

Tritium monitor  

DOE Patents [OSTI]

A system for continuously monitoring the concentration of tritium in an aqueous stream. The system pumps a sample of the stream to magnesium-filled combustion tube which reduces the sample to extract hydrogen gas. The hydrogen gas is then sent to an isotope separation device where it is separated into two groups of isotopes: a first group of isotopes containing concentrations of deuterium and tritium, and a second group of isotopes having substantially no deuterium and tritium. The first group of isotopes containing concentrations of deuterium and tritium is then passed through a tritium detector that produces an output proportional to the concentration of tritium detected. Preferably, the detection system also includes the necessary automation and data collection equipment and instrumentation for continuously monitoring an aqueous stream.

Chastagner, Philippe (Augusta, GA)

1994-01-01T23:59:59.000Z

215

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

216

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

217

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

218

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

219

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

220

Site Monitoring Area Maps  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to the Site Monitoring Area (SMA) The Site Monitoring Area sampler Control measures (best management practices) installed at the Site Monitoring Area Structures such as...

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Ca Isotope Effects in Orgueil Leachates and the Implications for the Carrier Phases of 54Cr Anomalies  

Science Journals Connector (OSTI)

Primitive meteorites contain small 40Ca excesses, in addition to rare anomalies in 48Ca. Refractory inclusions from Vigarano and Allende have larger 40Ca and resolvable 48Ca anomalies. These results imply that Ca isotopic heterogeneities were still present in the early solar system at both the mineral and whole-rock scale. The absence of correlated Ca isotope anomalies in leachates from the CI1 chondrite Orgueil containing large 54Cr anomalies has implications on the origin of the Cr anomalies. 54Cr has to be produced either in massive stars during s-process nucleosynthesis without accompanying 48Ca or in particular zones in the rare Type Ia supernovae. In the latter case, 54Cr has been produced in a zone predominantly enriched in Cr and 54Cr and not mixed with other zones, or 54Cr has been produced together with other neutron-rich nuclides and there has been subsequent decoupling of this material in the star, in the solar system, or in the laboratory.

Frederic Moynier; Justin I. Simon; Frank A. Podosek; Bradley S. Meyer; Joyce Brannon; Donald J. DePaolo

2010-01-01T23:59:59.000Z

222

Maintenance Plan for the Hanford Immobilized Low-Activity Tank Waste Performance Assessment  

SciTech Connect (OSTI)

The plan for maintaining the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (PA) is described. The plan includes expected work on PA reviews and revisions, waste reports, monitoring, other operational activities, etc.

MANN, F.M.

2000-02-09T23:59:59.000Z

223

Rangeland Drought Management for Texans: Planning: The Key to Surviving Drought  

E-Print Network [OSTI]

This publication outlines the steps that ranchers should take to survive a drought. Those steps include developing a plan for each enterprise of the operation, ranking strategic ranch goals, planning for resource flow, implementing and monitoring...

Hart, Charles R.; Carpenter, Bruce B.

2001-05-02T23:59:59.000Z

224

CSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TABLE OF CONTENTS  

E-Print Network [OSTI]

..........................................................................................................................................5 9.0 Ground- and Surface-Water MonitoringCSMRI Site Remediation Quality Assurance Project Plan March 30, 2004 TASK PLAN TABLE OF CONTENTS 1 .............................................................................................5 FIGURES #12;CSMRI Site Remediation Task Plan March 31, 2004 TASK PLAN CSMRI SITE REMEDIATION 1

225

Microsoft Word - N01401_NE and 4-5 Closure Mon Plan.doc  

Office of Legacy Management (LM)

Closure Monitoring Plan for the Closure Monitoring Plan for the Northeast Site and 4.5 Acre Site August 2009 LMS/PIN/N01401 This page intentionally left blank LMS/PIN/N01401 Pinellas Environmental Restoration Project Closure Monitoring Plan for the Northeast Site and 4.5 Acre Site August 2009 This page intentionally left blank U.S. Department of Energy Closure Monitoring Plan for the Northeast Site and 4.5 Acre Site July 2009 Doc. No. N01401 Page i Contents 1.0 Introduction......................................................................................................................... 1 2.0 Summary of Source Removal Activities............................................................................. 1 3.0 Delineation of Contaminant Plumes ...................................................................................

226

E-Print Network 3.0 - adaptive management plan Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

results for: adaptive management plan Page: << < 1 2 3 4 5 > >> 1 Regional Water Management: Adapting to Uncertain Water Summary: & Implement Management Options Monitor &...

227

Tax-Advantaged Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

228

Ambient monitoring of pollutants around synfuel plants : final report  

E-Print Network [OSTI]

This study was undertaken to aid in the evaluation of Environmental Monitoring Plans (EMP) submitted to the U.S. Synfuel Corporation by prospective operators of large-scale synfuel plants who are applying for financial ...

Golomb, D.

1984-01-01T23:59:59.000Z

229

How should indicators be found for scenario monitoring ?  

E-Print Network [OSTI]

Scenario planning is a widely used approach for developing long-term strategies. The typical scenario process involves developing scenarios, identifying strategies whose success is contingent on the scenario, and monitoring ...

He, Zheng, M. Eng. Massachusetts Institute of Technology

2013-01-01T23:59:59.000Z

230

Tennessee Valley Shorebird Assessment Project SHOREBIRD CONSERVATION AND MONITORING  

E-Print Network [OSTI]

Assessment Project SHORT-BILLED DOWITCHER WADES IN DEEPER WATER, NOTE LONG BILL DUNLIN #12;5 Tennessee Valley1 Tennessee Valley Shorebird Assessment Project SHOREBIRD CONSERVATION AND MONITORING Tennessee Valley Shorebird Assessment Project RESOURCES US SHOREBIRD CONSERVATOIN PLAN http

Gray, Matthew

231

Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

232

Water resource management planning guide for Savannah River Plant  

SciTech Connect (OSTI)

The Water Resource Management Planning Guide provides an outline for the development of a Savannah River Plant Water Resource Management Plan (WRMP) to protect, manage, and monitor the site's water resources. The management plan is based on three principle elements: (1) protection of the water quality, (2) management of the water quantity, and (3) monitoring of the water quality and quantity. The plan will assure that changes in water quality and quantity are identified and that corrective action is implemented as needed. In addition, water management activities within and between Savannah River Plant (SRP) organizations and departments will be coordinated to ensure the proper management of water resources. This document is intended as a guide to suggest goals and objectives that will provide a basis for the development of a water resource plan for SRP. Planning should be flexible rather than rigid, and the plan outlines in this document was prepared to be modified or updated as conditions necessitate. 16 refs., 12 figs.

Hubbard, J.E.; Stephenson, D.E.; Steele, J.L. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.); Gordon, D.E. (Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Plant)

1988-10-01T23:59:59.000Z

233

Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study  

SciTech Connect (OSTI)

Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (?2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ?2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the original plan fluence map as the starting stage reduced OAR dose at the mid-dose region, but increased the monitor units by 17%. Differences of only 2cc or less in OAR V50%/V70Gy/V76Gy were observed between 100 and 50 iterations.Conclusions: It is feasible to perform automatic online reoptimization in ?2 min using a clinical treatment planning system. Selecting optimal sets of input parameters is the key to achieving high quality reoptimized plans, and should be based on the individual patient's daily anatomy, delivery efficiency, and time allowed for plan adaptation.

Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie [Duke Medical Physics Graduate Program, Duke University, Durham, North Carolina 27705 and Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 (United States)] [Duke Medical Physics Graduate Program, Duke University, Durham, North Carolina 27705 and Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 (United States)

2013-11-15T23:59:59.000Z

234

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

7.1 (May 2010) 7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination 13. FAR 34.004 Acquisition Strategy Guiding Principles

235

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

--Chapter 7.1 (JUNE 2010) --Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles

236

Maps and Plans  

E-Print Network [OSTI]

shrouded door to box seats. Rose / Maps and Plans Re-Placing Places 20.1 Rose / Maps and Plans Re-Placing PlacesMaps and Plans Thomas Rose Architectural plans create the

Rose, Thomas

2008-01-01T23:59:59.000Z

237

Annual Training Plan Template  

Broader source: Energy.gov [DOE]

The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

238

Federal Radiological Monitoring and Assessment Center  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish Department of Energy (DOE) policy, procedures, authorities, and requirements for the establishment of a Federal Radiological Monitoring and Assessment Center (FRMAC), as set forth in the Federal Radiological Emergency Response Plan (FRERP). This directive does not cancel another directive. Canceled by DOE O 153.1.

1992-12-02T23:59:59.000Z

239

Bacterial Monitoring for the Buck Creek Watershed  

E-Print Network [OSTI]

personnel to conduct this study. With the help and cooperation of the Texas AgriLife Research and Extension Center at Vernon, a work plan was developed to collect water samples and conduct water quality monitoring every other week at 13 different sites along...

240

Diversity and Inclusion Strategic Plan 2012 - 2015 | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plan 2012 - 2015 Strategic Plan 2012 - 2015 Diversity and Inclusion Strategic Plan 2012 - 2015 Our Diversity and Inclusion Strategic Plan is designed to create a culture which values trust and human dignity and provides the opportunity for personal development and self- fulfillment in the attainment of DOE's mission and goals. The 2012- 2015 strategic plan has three essential pillars - mission focus, accountability, and continual learning. It also: Creates a universal definition of diversity and inclusion. Designs strategic outreach and recruitment initiatives to reach all segments of society. Creates an internal DOE-wide Diversity and Inclusion Council to monitor progress and support employee engagement. Promotes effective communication with employees and stakeholders to

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Monitoring your job  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jobs Monitoring and Managing Jobs Monitoring and Managing Batch Jobs These are some basic commands for monitoring and modifiying batch jobs while they're queued or running. NERSC...

242

Utility Monitor September 2010  

E-Print Network [OSTI]

Utility Monitor September 2010 Why monitor utility syntax? Enforce and Maintain Company-Wide DB2 Utility Standards. Jennifer Nelson Product Specialist, Rocket Software © 2010 IBM Corporation © 2010............................................................................................................... iv 1 Why Monitor DB2 Utility Syntax

243

PROJECT MANAGEMENT PLANS Project Management Plans  

Broader source: Energy.gov (indexed) [DOE]

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

244

Test Plan: WIPP bin-scale CH TRU waste tests  

SciTech Connect (OSTI)

This WIPP Bin-Scale CH TRU Waste Test program described herein will provide relevant composition and kinetic rate data on gas generation and consumption resulting from TRU waste degradation, as impacted by synergistic interactions due to multiple degradation modes, waste form preparation, long-term repository environmental effects, engineered barrier materials, and, possibly, engineered modifications to be developed. Similar data on waste-brine leachate compositions and potentially hazardous volatile organic compounds released by the wastes will also be provided. The quantitative data output from these tests and associated technical expertise are required by the WIPP Performance Assessment (PA) program studies, and for the scientific benefit of the overall WIPP project. This Test Plan describes the necessary scientific and technical aspects, justifications, and rational for successfully initiating and conducting the WIPP Bin-Scale CH TRU Waste Test program. This Test Plan is the controlling scientific design definition and overall requirements document for this WIPP in situ test, as defined by Sandia National Laboratories (SNL), scientific advisor to the US Department of Energy, WIPP Project Office (DOE/WPO). 55 refs., 16 figs., 19 tabs.

Molecke, M.A.

1990-08-01T23:59:59.000Z

245

Analysis of the Neurotoxic Plasticizer n-Butylbenzenesulfonamide by Gas Chromatography Combined with Accurate Mass Selected Ion Monitoring  

Science Journals Connector (OSTI)

......Australian domestic solid-waste landfill leachate (from...plastic container used for long-term storage of inoculating solutions...following: domestic solid-waste leachate (n = 11, including...thick domestic solid- waste landfill. The levels......

Pat Duffield; David Bourne; Karin Tan; Ralph M. Garruto; Mark W. Duncan

1994-01-01T23:59:59.000Z

246

Structural Health Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Impedance Methods Lamb Wave Propagations Time Reversal Acoustics Sequential Probability Ratio Test Extreme Value Statistics Remote Monitoring Building upon previous...

247

Solar Decathlon 2005, Instrumentation and Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Decathlon 2005: The Event in Review Decathlon 2005: The Event in Review Web Site Resources: Instrumentation and Monitoring 1 Solar Decathlon 2005, Instrumentation and Monitoring The Solar Decathlon organizers installed sensors and monitoring equipment in each house during assembly and removed the equipment during disassembly. (Some of the equipment was installed on prior visits to the teams' sites on their campuses during construction.) The locations of sensors and monitoring equipment were planned in advance through negotiations between the organizers and each team. Installation had to be completed on the Mall at least two days before the start of the objectively measured contests (October 10, 2005). Most of the teams, despite their very best intentions, were finishing construction of their houses during assembly on the Mall, which made

248

China-GHG Monitoring | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » China-GHG Monitoring (Redirected from GIZ-China GHG Monitoring) Jump to: navigation, search Name China - GHG Monitoring Agency/Company /Organization German Agency for International Cooperation (GIZ), Center for Clean Air Policy Partner on behalf of the Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) Sector Energy Focus Area Energy Efficiency Topics Low emission development planning Program Start 2011 Program End 2014 Country China Eastern Asia References GTZ in the People's Republic of China[1] Overview The project aims to develop capacities for a GHG-Monitoring system and an

249

Solar Decathlon 2007 Instrumentation and Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Solar Decathlon 2007 Solar Decathlon 2007 Instrumentation and Monitoring The Solar Decathlon Instrumentation and Monitoring Group (IMG), led by Mountain Energy Partnership (MEP) personnel, installed sensors and monitoring equipment in each house during assembly and removed the equipment during disassembly. The locations of sensors and monitoring equipment were planned in advance through negotiations between the organizers and each team. Installation had to be completed on the Mall at least two days before the start of the objectively measured contests (October 15, 2007). Most of the teams, despite their best intentions, were finishing construction of their houses during assembly on the Mall, which made installation of instrumentation a bit tricky. MEP is accustomed to working with the normal last-minute nature of

250

LANS DB PENSION PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

December 2010 December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS Defined Benefit Pension Plan Summary Plan Description This Summary Plan Description (SPD) is intended to provide a summary of the principal features of the LANS Defined Benefit Pension Plan ("Plan") and is not meant to interpret, extend or change the Plan in any way. This SPD will continue to be updated. Please check back on a regular basis for the most recent version. Nothing in the Plan and/or this SPD shall be construed as giving any member the right to be retained in service with LANS or any affiliated company, or as a guarantee of any rights or benefits under the Plan. LANS, in its sole discretion, reserves the right to amend the SPD or Plan, or to terminate the Plan, at any time.

251

Knowledge Preconditions for Plans  

Science Journals Connector (OSTI)

......research-article Original Articles Knowledge Preconditions for Plans ERNEST DAVIS...of time and a possible worlds model of knowledge. The definitions strictly subsume previous...semantics of plans|formal theory of knowledge.| Knowledge Preconditions for Plans......

ERNEST DAVIS

1994-10-01T23:59:59.000Z

252

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

253

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

254

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Broader source: Energy.gov (indexed) [DOE]

3 3 SAMPLE IMPLEMENTATION ACTIONS, RESEARCH MONITORING AND EVALUATION, AND POLICY AND PLANNING Fish and Wildlife Implementation Plan EIS Volume 3: Sample Implementation Actions, Research Monitoring and Evaluation, and Policy and Planning Volume 3/ 1 VOLUME 3 SAMPLE IMPLEMENTATION ACTIONS, RESEARCH MONITORING AND EVALUATION, AND POLICY AND PLANNING One of the major challenges within the Region has been understanding the interrelationships among the numerous proposed fish and wildlife mitigation and recovery actions. One reason for this difficulty is that these actions are derived from many different regional proposals, each of which has been designed to meet a specific goal. In addition, the lack of an effective tool to illustrate these interrelationships has hampered understanding.

255

Venus Technology Plan Venus Technology Plan  

E-Print Network [OSTI]

Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration a Roadmap for Venus Exploration (RVE) that is consistent with VEXAG priorities as well as Planetary Decadal Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology

Rathbun, Julie A.

256

4865 recreation planning [n  

Science Journals Connector (OSTI)

landsc. plan. pol. recr....(Development of policies, strategies and measures for the provision of recreation areas and facilities; ? urban area recreation planning ...

2010-01-01T23:59:59.000Z

257

Marketing Planning: Feeniks Koulu.  

E-Print Network [OSTI]

??Degree Thesis Marketing Planning: Feeniks Koulu demonstrates structured marketing planning process with the help of case company Feeniks Koulu. The central idea of Thesis is (more)

Raut, Biranjan

2013-01-01T23:59:59.000Z

258

Renewable Energy Monitoring Evaluation Terms of Reference | Open Energy  

Open Energy Info (EERE)

Renewable Energy Monitoring Evaluation Terms of Reference Renewable Energy Monitoring Evaluation Terms of Reference Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Renewable Energy Monitoring Evaluation Terms of Reference Agency/Company /Organization: World Bank Sector: Energy Focus Area: Renewable Energy Topics: Policies/deployment programs Website: web.worldbank.org/WBSITE/EXTERNAL/TOPICS/EXTENERGY2/EXTRENENERGYTK/0,, References: Renewable Energy Monitoring Evaluation Terms of Reference[1] Resources Design of a Monitoring and Evaluation Plan Audit of Solar Home Systems Project Mid-term Review Panel for Solar Home Systems Project Socio-Economic Survey of the Photovoltaic Pilot Project References ↑ "Renewable Energy Monitoring Evaluation Terms of Reference" Retrieved from "http://en.openei.org/w/index.php?title=Renewable_Energy_Monitoring_Evaluation_Terms_of_Reference&oldid=329154"

259

Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and  

Broader source: Energy.gov (indexed) [DOE]

Standard Review Plan Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities August 2013 2 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan (SRP) Preparation for Facility Operations Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Operation Post Operation August 2013 3 Table of Contents Objective ......................................................................................................................................... 4 Requirements .................................................................................................................................. 4 Primary References ......................................................................................................................... 6

260

FALL/WINTER 2011 11 great deal of planning is required  

E-Print Network [OSTI]

of the needed transit trips for a given day. Extraboard-Driver Workforce Planning for Bus Transit Operations that help monitor bus transit workforce efficiency and support better transit workforce planning; to analyzeFALL/WINTER 2011 11 A great deal of planning is required to provide safe and reliable bus service

Gupta, Diwakar

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Developing a Proficiency Testing Plan for your Laboratory Author and Presenter: Jeff C. Gust  

E-Print Network [OSTI]

by the participating laboratory. Why does my laboratory need a Proficiency Testing Plan? Regardless of the standard. The laboratory is required to plan and review the monitoring process. This section goes on to suggest severalDeveloping a Proficiency Testing Plan for your Laboratory Author and Presenter: Jeff C. Gust Vice

262

Landfill; leachates, landfill gases  

Science Journals Connector (OSTI)

is a method of refuse disposal on land without creating nuisance to public health or safety by using the principles of engineering to confine refuse to the smallest practicable area, to reduce it to the sma...

Ming H. Wong

1999-01-01T23:59:59.000Z

263

TASK PLAN: Tribal Issues Topic Group  

Broader source: Energy.gov (indexed) [DOE]

Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Tribal Issues Topic Group 7/12/00 Task Plan 1 Page 1 Status: Active DOE Lead: National Transportation Program (NTP-AL; Judith Holm @ 505-845-4767) Start Date: January 1998 End Date: TBD Subject: TEC Topic Group - Tribal Issues rpose: To address issues such as: (1) HM-164 as it relates to Tribes; (2) to complete the Tribal column of the Rail Topic Group Regulatory Matrix; (3) to determine Tribal authority to stop and inspect shipments of radioactive materials; (4) to provide tribal pre-notification of DOE spent fuel shipments consistent with DOE policy and to provide continuous satellite-based tracking and monitoring capability to Tribes; (5) and to address Tribal involvement in transportation planning, training, and funding. The Topic Group

264

Implementation planning for industrial energy conservation: approach and methodology  

SciTech Connect (OSTI)

Details of an industry-specific Conservation Technology Implementation Branch implementation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented. (MCW)

Alston, T.G.; Falk, G.; Grogan, P.J.; Katz, D.; Tatar, J.

1981-01-01T23:59:59.000Z

265

Motion Planning ! Jana Kosecka!  

E-Print Network [OSTI]

1! Motion Planning ! Jana Kosecka! Department of Computer Science! ·Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien! Discrete Planning! · Review of some discrete planning methods! · Given state space is discrete) ! · Use well developed search and graph traversal algorithms to find the path! · Path: set

Kosecka, Jana

266

Climate change action plan  

E-Print Network [OSTI]

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

267

Intermountain Province Subbasin Plan  

E-Print Network [OSTI]

, and stakeholders. The IMP subbasin plan includes: · an assessment providing the technical foundation for the plan Power and Conservation Council Portland, Oregon O N B E H A L F O F : Intermountain Province Oversight Planning in the Intermountain Province The Northwest Power Planning Council1 's (Council) 2000 Fish

268

EA-1592: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EA-1592: Mitigation Action Plan Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant Based on the analysis in the Environmental Assessment prepared for the proposal by the GSA and NNSA, neither the construction nor operation of the selected alternative wouldhave significant environmental impact. This MAP contains mitigation and monitoring commitments for the project, including commitments set in permits for the new facility. Mitigation Action Plan for the Modernization of Facilities and Infrastructure for the Non-Nuclear Production Activities Conducted at the NNSA's Kansas City Plant More Documents & Publications EA-1592: Finding of No Significant Impact

269

Draft Mission Plan Amendment  

SciTech Connect (OSTI)

The Department of Energy`s Office Civilian Radioactive Waste Management has prepared this document to report plans for the Civilian Radioactive Waste Management Program, whose mission is to manage and dispose of the nation`s spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and of workers and the quality of the environment. The Congress established this program through the Nuclear Waste Policy Act of 1982. Specifically, the Congress directed us to isolate these wastes in geologic repositories constructed in suitable rock formations deep beneath the surface of the earth. In the Nuclear Waste Policy Amendments Act of 1987, the Congress mandated that only one repository was to be developed at present and that only the Yucca Mountain candidate site in Nevada was to be characterized at this time. The Amendments Act also authorized the construction of a facility for monitored retrievable storage (MRS) and established the Office of the Nuclear Waste Negotiator and the Nuclear Waste Technical Review Board. After a reassessment in 1989, the Secretary of Energy restructured the program, focusing the repository effort scientific evaluations of the Yucca Mountain candidate site, deciding to proceed with the development of an MRS facility, and strengthening the management of the program. 48 refs., 32 figs.

NONE

1991-09-01T23:59:59.000Z

270

Monitoring jobs with qs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jobs Monitoring jobs with qs Monitoring jobs with qs qs is an alternative tool to the SGE-provided qstat for querying the queue status developed at NERSC. qs provides an...

271

Corrosion monitoring apparatus  

DOE Patents [OSTI]

A corrosion monitoring device in an aqueous system which includes a formed crevice and monitoring the corrosion of the surfaces forming the crevice by the use of an a-c electrical signal.

Isaacs, Hugh S. (Shoreham, NY); Weeks, John R. (Stony Brook, NY)

1980-01-01T23:59:59.000Z

272

Multidimensionality of parental monitoring  

E-Print Network [OSTI]

This study explored the construct of parental monitoring and its relation to antisocial behavior in children. The factor structure of the Alabama Parenting Questionnaire Poor Monitoring/Supervision Scale (Frick, 1991) was examined to determine...

Secrest, Laura A

2012-06-07T23:59:59.000Z

273

Schedule optimization study implementation plan  

SciTech Connect (OSTI)

This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

Not Available

1993-11-01T23:59:59.000Z

274

Microsoft Word - Vol I.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Volume I Volume I Legacy Management Plan April 2010 U.S. Department of Energy Revision 4 Final Comprehensive Legacy Management and Institutional Controls Plan U.S. Department of Energy Volume I-Legacy Management Plan Doc. No. S03496-4.1-Draft Page 1-2 September 2010 * Attachment C-Groundwater/Leak Detection and Leachate Monitoring Plan * Attachment D-Integrated Environmental Monitoring Plan * Attachment E-Community Involvement Plan These support plans outline the operational requirements associated with the ongoing groundwater remedy (Attachment A); the surveillance and maintenance requirements for the OSDF (Attachment B); surveillance and maintenance for the leachate and groundwater associated with the OSDF (Attachment C); the environmental monitoring requirements necessary

275

Plan - Data Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

276

Guidance for Planning Exercises  

Broader source: Energy.gov (indexed) [DOE]

for Planning, Conducting and Evaluating for Planning, Conducting and Evaluating Transportation Emergency Preparedness Tabletops, Drills and Exercises Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-10.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Evaluating aluating aluating aluating aluating T T T T Tr r r r ransportation Emer ansportation Emer ansportation Emer ansportation Emer ansportation Emergenc genc genc genc gency Pr y Pr y Pr y Pr y Prepar epar epar epar eparedness T

277

Groundwater surveillance plan for the Oak Ridge Reservation  

SciTech Connect (OSTI)

US Department of Energy (DOE) Order 5400.1 requires the preparation of environmental monitoring plans and implementation of environmental monitoring programs for all DOE facilities. The order identifies two distinct components of environmental monitoring, namely effluent monitoring and environmental surveillance. In general, effluent monitoring has the objectives of characterizing contaminants and demonstrating compliance with applicable standards and permit requirements, whereas environmental surveillance has the broader objective of monitoring the effects of DOE activities on on- and off-site environmental and natural resources. The purpose of this document is to support the Environmental Monitoring Plan for the Oak Ridge Reservation (ORR) by describing the groundwater component of the environmental surveillance program for the DOE facilities on the ORR. The distinctions between groundwater effluent monitoring and groundwater surveillance have been defined in the Martin Marietta Energy Systems, Inc., Groundwater Surveillance Strategy. As defined in the strategy, a groundwater surveillance program consists of two parts, plant perimeter surveillance and off-site water well surveillance. This document identifies the sampling locations, parameters, and monitoring frequencies for both of these activities on and around the ORR and describes the rationale for the program design. The program was developed to meet the objectives of DOE Order 5400.1 and related requirements in DOE Order 5400.5 and to conform with DOE guidance on environmental surveillance and the Energy Systems Groundwater Surveillance Strategy.

Forstrom, J.M. [Oak Ridge K-25 Site, TN (United States); Smith, E.D.; Winters, S.L. [Oak Ridge National Lab., TN (United States). Environmental Sciences Div.; Haase, C.S.; King, H.L. [Oak Ridge Y-12 Plant, TN (United States); McMaster, W.M. [McMaster (W.M.), Heiskell, TN (United States)

1994-07-01T23:59:59.000Z

278

IDENTIFICATION OF DOE'S POST-CLOSURE MONITORING NEEDS AND REQUIREMENTS  

SciTech Connect (OSTI)

The 2006 plan sets an ambitious agenda for the U.S. Department of Energy (DOE), Office of Environmental Management (EM) and the remediation of sites contaminated by decades of nuclear weapons production activities. The plan's primary objective is to reduce overall clean up costs by first eliminating the environmental problems that are most expensive to control and safely maintain. In the context of the 2006 Plan, closure refers to the completion of area or facility specific cleanup projects. The cleanup levels are determined by the planned future use of the site or facility. Use restrictions are still undecided for most sites but are highly probable to exclude residential or agricultural activities. Most of the land will be remediated to ''industrial use'' levels with access restrictions and some areas will be closed-off through containment. Portions of the site will be reserved for waste disposal, either as a waste repository or the in-situ immobilization of contaminated soil and groundwater, and land use will be restricted to waste disposal only. The land used for waste disposal will require monitoring and maintenance activities after closure. Most of the land used for industrial use may also require such postclosure activities. The required postclosure monitoring and maintenance activities will be imposed by regulators and stakeholders. Regulators will not approve closure plans without clearly defined monitoring methods using approved technologies. Therefore, among all other more costly and labor-intensive closure-related activities, inadequate planning for monitoring and lack of appropriate monitoring technologies can prevent closure. The purpose of this project is to determine, document, and track the current and evolving postclosure monitoring requirements at DOE-EM sites. This information will aid CMST-CP in guiding its postclosure technology development and deployment efforts.

M.A. Ebadian, Ph.D.

1999-01-01T23:59:59.000Z

279

Monitored Geologic Repository Operations Monitoring and Control System Description Document  

SciTech Connect (OSTI)

The Monitored Geologic Repository Operations Monitoring and Control System provides supervisory control, monitoring, and selected remote control of primary and secondary repository operations. Primary repository operations consist of both surface and subsurface activities relating to high-level waste receipt, preparation, and emplacement. Secondary repository operations consist of support operations for waste handling and treatment, utilities, subsurface construction, and other selected ancillary activities. Remote control of the subsurface emplacement operations, as well as, repository performance confirmation operations are the direct responsibility of the system. In addition, the system monitors parameters such as radiological data, air quality data, fire detection status, meteorological conditions, unauthorized access, and abnormal operating conditions, to ensure a safe workplace for personnel. Parameters are displayed in a real-time manner to human operators regarding surface and subsurface conditions. The system performs supervisory monitoring and control for both important to safety and non-safety systems. The system provides repository operational information, alarm capability, and human operator response messages during emergency response situations. The system also includes logic control to place equipment, systems, and utilities in a safe operational mode or complete shutdown during emergency response situations. The system initiates alarms and provides operational data to enable appropriate actions at the local level in support of emergency response, radiological protection response, evacuation, and underground rescue. The system provides data communications, data processing, managerial reports, data storage, and data analysis. This system's primary surface and subsurface operator consoles, for both supervisory and remote control activities, will be located in a Central Control Center (CCC) inside one of the surface facility buildings. The system consists of instrument and control equipment and components necessary to provide human operators with sufficient information to monitor and control the operation of the repository in an efficient and safe manner. The system consists of operator consoles and workstations, multiple video display terminals, communications and interfacing equipment, and instrument and control software with customized configuration to meet the needs of the Monitored Geologic Repository (MGR). Process and logic controllers and the associated input/output units of each system interfaced with this system will be configured into Remote Terminal Units (RTU) and located close to the systems to be monitored and controlled. The RTUs are configured to remain operational should communication with CCC operations be lost. The system provides closed circuit television to selectively view systems, operations, and equipment areas and to aid in the operation of mechanical systems. Control and monitoring of site utility systems will be located in the CCC. Site utilities include heating, ventilation, and air conditioning equipment; plant compressed air; plant water; firewater; electrical systems; and inert gases, such as nitrogen, if required. This system interfaces with surface and subsurface systems that either generate output data or require remote control input. The system interfaces with the Site Communications System for bulk storage of operational data, on-site and off-site communication, and a plant-wide public announcement system. The system interfaces with the Safeguards and Security System to provide operational status and emergency alarm indications. The system interfaces with the Site Operation System to provide site wide acquisition of data for analysis and reports, historical information for trends, utility information for plant operation, and to receive operating plans and procedures.

E.F. Loros

2000-06-29T23:59:59.000Z

280

Microsoft Word - prjct planning  

Broader source: Energy.gov (indexed) [DOE]

Planning Checklist Planning Checklist The following checklist is intended to provide system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and preparing project planning activities. The checklist reflects recognized project planning activities to be performed throughout the information systems project life cycle. Project planning is generally characterized as a process for selecting the strategies, policies, programs, and procedures for achieving the objectives and goals of the project. The objectives of project planning for information systems projects are summarized as the following: C User's environment is analyzed. C Project objectives and scope are defined. C High-level functional requirements are estimated.

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities  

Broader source: Energy.gov (indexed) [DOE]

14 14 Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Commercial Grade Dedication (CGD) August 2013 2 of 14 OFFICE OF ENVIRONMENTAL MANAGEMENT Standard Review Plan (SRP) Commercial Grade Dedication (CGD) Applicability CD-0 CD-1 CD-2 CD-3 CD-4 Operation Post Operation August 2013 3 of 14 Table of Contents Objective ....................................................................................................................................................... 4 Overview of Commercial Grade Dedication for Nuclear Facilities .............................................................. 4 Requirements ................................................................................................................................................ 5

282

Seismic Imaging and Monitoring  

SciTech Connect (OSTI)

I give an overview of LANL's capability in seismic imaging and monitoring. I present some seismic imaging and monitoring results, including imaging of complex structures, subsalt imaging of Gulf of Mexico, fault/fracture zone imaging for geothermal exploration at the Jemez pueblo, time-lapse imaging of a walkway vertical seismic profiling data for monitoring CO{sub 2} inject at SACROC, and microseismic event locations for monitoring CO{sub 2} injection at Aneth. These examples demonstrate LANL's high-resolution and high-fidelity seismic imaging and monitoring capabilities.

Huang, Lianjie [Los Alamos National Laboratory

2012-07-09T23:59:59.000Z

283

Tribal Strategic Energy Plan and Planning Handbook  

Broader source: Energy.gov [DOE]

The Tribal Strategic Energy Plan and Planning Handbook, published by the DOE Office of Indian Energy, is a tool for Tribes to use to help achieve energy goals in both the near- and long-term. This Handbook intends to help tribal leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

284

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

not specifically related to transmission planning and not to outside companies who may require the help in transmission planning. It is essential that we take the market opportunity that currently exists to expand our services to our existing and new clients...

Tu, Linh

2006-12-15T23:59:59.000Z

285

Sandia National Laboratories California Environmental Monitoring Program Annual Report.  

SciTech Connect (OSTI)

The annual program report provides detailed information about all aspects of the SNL/CA Environmental Monitoring Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Environmental Monitoring Program, one of six programs that supports environmental management at SNL/CA.

Holland, Robert C.

2007-03-01T23:59:59.000Z

286

Training Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

287

Green Development Plan  

Science Journals Connector (OSTI)

The Ninth Five-Year Plan introduced two changes: the economic system will change from a traditional planned economy to a socialist market economy; and the economic growth mode will change from extensive to int...

Angang Hu

2014-01-01T23:59:59.000Z

288

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

Slides thanks to http://cs.cmu.edu/~motionplanning, Jyh-Ming Lien Hard Motion Planning · Configuration Geometric Models S Sampling Based Motion Planner Discrete Search C-space planning Idea : Generate random

Kosecka, Jana

289

RM Capital Investment Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Capital Investment Plans FY 2004 (568kb pdf) FY 2005 (625kb pdf) FY 2006 (625kb pdf) FY 2007 (1.45mb pdf) Meter policy Capital Investment Plans...

290

Decommissioning Plan RM  

Broader source: Energy.gov [DOE]

The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

291

Sustainabiliity Sustainability Plan  

E-Print Network [OSTI]

Sustainabiliity IIT Campus Sustainability Plan 2010­2020 Published Fall Semester 2010 www.iit.edu/campus_sustainability #12;IIT Campus Sustainability Plan 2010-2020 Fall Semester 2010 1 Section I: Background Sustainability ...................................................................................................................................................................8 IIT Academic Entities on Sustainability

Heller, Barbara

292

Virginia Energy Plan (Virginia)  

Broader source: Energy.gov [DOE]

The 2010 Virginia Energy Plan affirms the state's support for the development of renewable energy. The Plan assesses the states energy picture through an examination of the states primary energy...

293

Texas LoanSTAR Monitoring and Analysis Program Draft Plan  

E-Print Network [OSTI]

for calibration of electrical meters and gas meters. It is not cost effective to perform independent calibration with less than 100 sites per year. The Energy Systems Laboratory will use National Institute of Standards and Technology (NIST) certified...-84, Method of Verification and Calibration at Liquid-in-Glass Thermometers 6. ASME Standard PTC 19.3-74 Part 3, Temperature Measurement Instruments and Applications Equipment - thermometer storage rack - microscope (15-20-X power) - ice bath with necessary...

Claridge, D. E.; Haberl, J. S.; Heffington, W. M.; O'Neal, D. L.; Turner, W. D.; Etheredge, R.; Glass, M.

1989-01-01T23:59:59.000Z

294

Title Environmental Monitoring Plan for the Tonopah Test Range...  

National Nuclear Security Administration (NNSA)

works (lagoon) are subject * to effluent discharge limits at this time. 2.2.2 Septic Tanks | Five septic tanks still are in use at remote locations on the TTR and are operated...

295

A CULTURAL RESOURCES MONITORING AND DISCOVERY PLAN FOR MAINTENANCE...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Great Plains, edited by W. Dort and J. K. Jones. Department of Geology Special Publication No. 3. University Press of Kansas Lawrence. Hays-Gilpin, K. A. and E. Van...

296

2030 OCARTS Plan Report  

E-Print Network [OSTI]

2030 OCARTS PLAN REPORT Oklahoma City Area Regional Transportation Study Adopted by the Intermodal Transportation Policy Committee and Endorsed by the Board of Directors of the Association... entitled Planning for 2030: Oklahoma City Area Regional Transportation Study and the Technical Supplement to the Plan Report are companion pieces to this document. The Plan brochure was developed to provide an overview of both the development process...

Association of Central Oklahoma Governments

297

NHMFL Emergency Action Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-3 TITLE: EMERGENCY ACTION PLAN ...

298

Sitewide monitoring at Agra, Kansas, June 2009.  

SciTech Connect (OSTI)

In 1985, carbon tetrachloride was discovered in the groundwater at Agra, Kansas, during routine sampling of public water supply wells. Two of Agra's four public water supply wells contained low but detectable levels of carbon tetrachloride; the concentrations in wells PWS-3 and PWS-4 exceeded the maximum contaminant level. These wells were removed from service in 1986, although they remain available for uses other than drinking water. Other public wells, outside the area of contamination, supply drinking water for the city of Agra. In 1987-2005, the Kansas Department of Health and Environment (KDHE) and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) conducted investigations to delineate the contaminant plume and to identify source areas for the contamination - which results from the past use of grain fumigants containing carbon tetrachloride. Source areas were identified on the former CCC/USDA grain storage facility property and on the Producers Agricultural Marketing Association, Inc., property located to the south (Argonne 2006). The contaminant plume extends to the southeast, toward well PWS-3, from the identified source areas. Both the CCC/USDA and Pro-Ag Marketing are currently implementing KDHE-approved interim measures (IMs). To address the contamination identified on its former property, the CCC/USDA is implementing a source control IM consisting of large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). Pro-Ag Marketing plans to use groundwater extraction to address the downgradient plume. The CCC/USDA and Pro-Ag completed installation of the two interim measures in May 2009 and August 2009, respectively. The performance and assessments of the effectiveness of the IMs are being reported separately by the responsible entities. As part of the IM process, the KDHE (2008) requested the development of a joint sitewide groundwater monitoring plan to allow periodic assessment of the effectiveness of the separate IMs being implemented by the CCC/USDA and Pro-Ag, through monitoring of the level of contamination and the resulting change in both the extent and internal configuration of the downgradient plume. A Joint Work Plan for Sitewide Monitoring was developed by the CCC/USDA through its technical consultant, Argonne National Laboratory, and was reviewed, approved, and signed by Pro-Ag Marketing and subsequently submitted to the KDHE on May 12, 2009. The KDHE (2009a) provided comments on the Joint Work Plan on May 27, 2009, requesting submission of a revised version. To minimize delays, the KDHE allowed the CCC/USDA to proceed with the scheduled annual sampling proposed in the Joint Work Plan. The sampling was to be conducted according to the previously approved low-flow sampling methodology (Argonne 2009). Argonne conducted the first annual sampling event for the CCC/USDA on June 15-16, 2009. The finalized, signed version of the Joint Work Plan provided to the KDHE on November 9, 2009, is in Appendix A. Table 1.1 lists the monitoring and public water supply wells to be sampled under the Joint Work Plan, plus the wells being sampled to monitor the respective IMs. The entity responsible for each monitoring element is indicated, along with well completion dates and well registration numbers. The subject of this report is the initial sitewide groundwater sampling event that occurred on June 15-16, 2009, under the Joint Work Plan.

LaFreniere, L. M.; Environmental Science Division

2010-01-14T23:59:59.000Z

299

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

1 Motion Planning Jana Kosecka Department of Computer Science · Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien State space · Set of all possible states is represented as graph · Nodes states, links planning ­ generate a set of actions, if the solution exists it must be found in the finite time · Search

Kosecka, Jana

300

Bicycle Master Plan Acknowledgments  

E-Print Network [OSTI]

Bicycle Master Plan #12;Acknowledgments Many people contributed to the development of the APU Bicycle Master Plan by providing valuable input, comments and review of the document. Different departments of APU will have to work together to implement the plan and to further encourage bicycling

Scheel, David

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

Work Management Examples Work Management Examples Example 36 8.2.5 Work Processes Work associated with nuclear safety functions will be planned, authorized, and performed following approved technical standards, instructions, procedures, and other control documentation commensurate with the complexity and risk posed by the task. The calibration program governs the process that ensures quality of the calibration and maintenance of process monitoring equipment. Equipment found to be out of calibration is tagged and not used until re-calibrated. HNF-PRO that implement DOE-Order 5480.19, and HNF-PRO-233, -298, and others determined applicable, will be evaluated and necessary facility specific procedures developed to complement them for implementation. 10.2 Personnel Safety

302

Microsoft PowerPoint - WGA presentation on mkt monitor 110403.ppt  

Broader source: Energy.gov (indexed) [DOE]

A Review of Market Monitoring A Review of Market Monitoring A Review of Market Monitoring A Review of Market Monitoring Activities at U.S. Independent System Activities at U.S. Independent System Operators Operators Bernard Lesieutre & Charles Goldman Lawrence Berkeley National Laboratory Western Interstate Energy Board Committee on Regional Electric Power Cooperation Las Vegas NV November 4, 2003 Energy Analysis Department Approach Approach * Focused on four operating ISOs - CAISO, ISO-NE, NYISO, and PJM * Conducted Interviews - ISO market monitoring staff - External Market monitors (e.g., CAISO MSC) - State PUC and FERC OMOI staff * Review documents on Market Monitoring - ISO Market Monitoring plans; Annual Reports - Regulatory proceedings Energy Analysis Department Approach (cont) Approach (cont) * Synthesize information on market monitoring

303

Draft 2014 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013...

304

Long Range Campus Development Plan Implementation and Plan Phasing  

E-Print Network [OSTI]

Long Range Campus Development Plan Implementation and Plan Phasing 55 Introduction Plan Review approach and the formal, regular review of the process of the Plan. MSU will revisit the Plan on a cyclical will continue to build upon and refine these fundamental elements and strategies. Recurring review of the Plan

Maxwell, Bruce D.

305

Ecological Monitoring - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

support of the National Environmental Protection Act, Endangered Species Act, Migratory Bird Treaty Act, and other laws and regulations. Management Plans Hanford Site Revegetation...

306

Report: EM Strategic Planning  

Broader source: Energy.gov (indexed) [DOE]

STRATEGIC PLANNING STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty and Risk Reduction, which were addressed in previous reports and recommendations to the Assistant Secretary. The EMAB Strategic Planning Committee was formed to expand on this earlier work and pursue dialogues with the EM Office of Program Planning and Budget (EM-30) in

307

Operating plan FY 1998  

SciTech Connect (OSTI)

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

NONE

1997-10-01T23:59:59.000Z

308

Alaska Strategic Energy Plan and Planning Handbook  

Broader source: Energy.gov (indexed) [DOE]

Alaska Strategic Energy Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

309

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 Human Resources #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Oliver, Douglas L.

310

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Department 2588 Hospital Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Kim, Duck O.

311

Integrated Planning and Performance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

312

Insulation Monitors Settings Selection  

Science Journals Connector (OSTI)

In the chapter general requirements set to insulation monitors selection in AC and DC networks ... given. Examples of regulations requirements for circuits insulation equivalent resistance are presented. Traditio...

Piotr Olszowiec

2013-01-01T23:59:59.000Z

313

Section 42: Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

using techniques that do not jeopardize the containment of waste in the disposal system. Ten monitoring parameters were identified in an analysis performed to fulfill the section...

314

Tracking Talking: Dual Task Costs of Planning and Producing Speech for Young versus Older Adults  

E-Print Network [OSTI]

A digital pursuit rotor was used to monitor speech planning and production costs by time-locking tracking performance to the auditory wave form produced as young and older adults were describing someone they admire. The ...

Kemper, Susan; Hoffman, Lesa; Schmalzried, RaLynn Cheri; Herman, Ruth; Kieweg, Doug

2011-05-01T23:59:59.000Z

315

TWRS phase I privatization site environmental baseline and characterization plan  

SciTech Connect (OSTI)

This document provides a plan to characterize and develop an environmental baseline for the TWRS Phase I Privatization Site before construction begins. A site evaluation study selected the former Grout Disposal Area of the Grout Treatment Facility in the 200 East Area as the TWRS Phase I Demonstration Site. The site is generally clean and has not been used for previous activities other than the GTF. A DQO process was used to develop a Sampling and Analysis Plan that would allow comparison of site conditions during operations and after Phase I ends to the presently existing conditions and provide data for the development of a preoperational monitoring plan.

Shade, J.W.

1997-09-01T23:59:59.000Z

316

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I  

E-Print Network [OSTI]

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I DAVID DUFFY,* S with planning experts and reviewed current literature to derive 15 criteria that in our opinion were important that reviewed plans only partially fulfilled most criteria. Only five reviewed plans came within 10% of total

Duffy, David Cameron

317

FY 1987 current fiscal year work plan  

SciTech Connect (OSTI)

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

Not Available

1986-12-01T23:59:59.000Z

318

Project Surveillance and Maintenance Plan. [UMTRA Project  

SciTech Connect (OSTI)

The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the (guidance) to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs.

Not Available

1985-09-01T23:59:59.000Z

319

Electronic Monitoring White Papers  

E-Print Network [OSTI]

the initial development costs. But if that system can be easily implemented in another area, those costs for operations, maintenance, and quality checks (QA & QC). The goal of video monitoring is to provide a cost monitoring programs in NMFS-managed fisheries where data extracted from video are used for science

320

Transmission Line Security Monitor  

SciTech Connect (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

HP Steam Trap Monitoring  

E-Print Network [OSTI]

Consumption Peak Demand Mgt Peak Demand Mgt Similar Weather Day Analysis Metering and Verafication Steam Meter Monitoring ? Peak Demand Management ? Steam Consumption Management ? Steam Bill Verification ? Measurement and Verification ... Consumption Peak Demand Mgt Peak Demand Mgt Similar Weather Day Analysis Metering and Verafication Steam Meter Monitoring ? Peak Demand Management ? Steam Consumption Management ? Steam Bill Verification ? Measurement and Verification ...

Pascone, S.

2011-01-01T23:59:59.000Z

322

Transmission Line Security Monitor  

ScienceCinema (OSTI)

The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

None

2013-05-28T23:59:59.000Z

323

A Prolog-Based MAS for Railway Signalling Monitoring: Implementation and Experiments  

E-Print Network [OSTI]

- ployed for monitoring and controlling the cycle of generating, transporting and distributing electrical private energy groups [8]. ARCHON's Planning and Coordination Module was implemented as a rule- based for their implementation. I. INTRODUCTION Distributed diagnosis and monitoring represent one of the oldest application

Mascardi, Viviana

324

Monitoring Jobs on Hopper  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Jobs Monitoring Jobs Monitoring Jobs Monitoring Edison Batch Jobs The batch system provides the command to monotor your jobs. We are listing the commands commonly used to submit and monitor the jobs. For more informaiton please refer to the man pages of these commands. Job Commands Command Description qsub batch_script Submits batch script to the queue. The output of qsub will be a jobid qdel jobid Deletes a job from the queue qhold jobid Puts a job on hold in the queue. qrls jobid Releases a job from hold. qalter [options] jobid Change attributes of submitted job. (See below.) qmove new_queue jobid Move job to new queue. Remember, the new queue must be one of the submission queues (premium, regular, or low) qstat -a Lists jobs in submission order (more useful than qstat without options) Also takes -u and -f [jobid]> options

325

EIS-0409: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EIS-0409: Mitigation Action Plan Kemper County Integrated Gasification Combined Cycle Project, Kemper County, Mississippi The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County Integrated Gasification Combine Cycle Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. Mitigation Action Plan Kemper County Iintegrated Gasification Combined Cycle Project, Kemper County, Mississippi, DOE/EIS-0409 (September 2010)

326

Decommissioning Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Decommissioning Plan Review Module Decommissioning Plan Review Module March 2010 CD-0 O 0 C OFFICE OF D C CD-1 F ENVIRO Standard R Decomm Rev Critical Decisi CD-2 M ONMENTAL Review Plan missioning view Module ion (CD) Ap CD March 2010 L MANAGE n (SRP) g Plan e plicability D-3 EMENT CD-4 Post Oper ration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

327

Project Execution Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

328

IDC Integrated Master Plan.  

SciTech Connect (OSTI)

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

Clifford, David J.; Harris, James M.

2014-12-01T23:59:59.000Z

329

JGI - Sequencing Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sequencing Plans Sequencing Plans JGI engages users from the National Laboratory system, academic institutions, and private industry to perform sequencing projects that directly relate to the DOE Office of Biological and Environmental Research's missions in alternative energy, global carbon cycling, and bioremediation. JGI's sequencing portfolio is drawn from its user programs, including the Community Science Program and the new Bioenergy Research Centers, as well as targets chosen by DOE to meet programmatic objectives. Plans by Program and Year All projects GEBA Sequencing Plans Community Science Program FY2014 Community Sequencing Program FY2013 Community Sequencing Program FY2012 Community Sequencing Program FY2011 Community Sequencing Program FY2010 Community Sequencing Program FY2009

330

Advance Care Planning Safeguards  

Science Journals Connector (OSTI)

Regardless of which goals of advance care planning are featured, safeguards, as reviewed in my article and by...5 we inadvertently may be doing harm.

J. Andrew Billings MD

2012-11-01T23:59:59.000Z

331

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

332

WATER CONSERVATION PLAN  

National Nuclear Security Administration (NNSA)

i WATER CONSERVATION PLAN TONOPAH TEST RANGE UNITED STATES DEPARTMENT OF ENERGY January 10, 2011 Prepared for: Tonopah Test Range Post Office Box 871 Tonopah, Nevada 89049 (702)...

333

Strategic Plan: 2014 - 2018  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

marketplace to an expanding customer base. EIA's program directly supports Goal 1 (Science and Energy) of DOE's 2014 Strategic Plan. Specifically, EIA has identified four...

334

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

335

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

336

Navajo Marketing Plan Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Navajo Surplus Marketing Reference Material Amended Navajo Marketing Plan AZ Water Settlements Act Colorado River Basin Project Act General Power Contract Provisions (GCPC) - 09...

337

BROMEX Logistics Meeting plan  

E-Print Network [OSTI]

BROMEX Logistics Meeting plan Fairbanks, Alaska 22-23 Feb 2011 #12;22 Feb 2011 ­ Photo taken by Son

Rigor, Ignatius G.

338

PROJECT MANAGEMENT PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7, 2011 Verification Method: Functional model module operating in decision support system Title: Water institutions tool: Phase I Planned Date: April 1, 2011 Verification...

339

BPA Energy Efficiency Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA Energy Efficiency Plan Pages default Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE...

340

MITG Test Plan  

SciTech Connect (OSTI)

The plan presented is for the testing of a prototypical slice of the Modular Isotopic Thermoelectric Generator (MITG). Cross Reference T48-1.

Eck, Marshall B.

1981-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

State Energy Strategic Planning  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

342

planning for emergencies  

National Nuclear Security Administration (NNSA)

1%2A en Planning for Emergencies http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismplanningforemergencies

343

Strategic Energy Planning Process  

Broader source: Energy.gov [DOE]

The nine-step process for community strategic energy planning helps Tribes establish a comprehensive understanding of current energy use and costs, get insight into efficiency and conservation...

344

Test plan : reducing soft costs of rooftop solar installations attributed to structural considerations.  

SciTech Connect (OSTI)

This test plan is a document that provides a systematic approach to the planned testing of rooftop structures to determine their actual load carrying capacity. This document identifies typical tests to be performed, the responsible parties for testing, the general feature of the tests, the testing approach, test deliverables, testing schedule, monitoring requirements, and environmental and safety compliance.

Dwyer, Stephen F.

2013-05-01T23:59:59.000Z

345

Fire Alarm Testing and Inspection Planning and Vendor Check In/Check Out Process  

E-Print Network [OSTI]

Fire Alarm Testing and Inspection Planning and Vendor Check In/Check Out Process DOCUMENT PURPOSE This process is used for fire alarm testing and inspection pre-work planning and vendor check in and check out ____________________________________________________ CHECK IN PRIOR TO TESTING NOTES _____ Central Monitoring (BSAC) notified of daily testing start time

Webb, Peter

346

November 21, 2000 PV Lesson Plan 2 Sample Questions & Answers  

E-Print Network [OSTI]

November 21, 2000 PV Lesson Plan 2 ­ Sample Questions & Answers Prepared for the Oregon Million Solar Roofs Coalition By Frank Vignola ­ University of Oregon Solar Radiation Monitoring Lab John Hocken your understanding: 1. The typical voltage of a silicon solar cell is about 0.5 volts; where does

Oregon, University of

347

Health Education Lesson Plans Health Education Lesson Plans  

E-Print Network [OSTI]

Health Education Lesson Plans Health Education Lesson Plans (Healthy Kids Resource Center; no lesson plans to download, but library of health curriculum http://www.hkresources.org/ Dairy Council://www.epa.gov/teachers For Lesson Plans http://www.forlessonplans.com Health Lessons Plans Web Quest http://www.edhelper.com/cat55

de Lijser, Peter

348

Up-Stream Dissolved Oxygen TMDL Project Quality Assurance ProjectPlan  

SciTech Connect (OSTI)

A quality assurance project plan (QAPP) for the execution of an ecosystem level monitoring and research program examining algal ecology in highly impaired rivers. Procedures for executing both field and laboratory surface water quality and flow analysis are described. The procedures described here are compatible with the California Surface Water Ambient Monitoring program (SWAMP).

Stringfellow, William T.

2005-05-13T23:59:59.000Z

349

Decision support software technology demonstration plan  

SciTech Connect (OSTI)

The performance evaluation of innovative and alternative environmental technologies is an integral part of the US Environmental Protection Agency's (EPA) mission. Early efforts focused on evaluating technologies that supported the implementation of the Clean Air and Clean Water Acts. In 1986 the Agency began to demonstrate and evaluate the cost and performance of remediation and monitoring technologies under the Superfund Innovative Technology Evaluation (SITE) program (in response to the mandate in the Superfund Amendments and Reauthorization Act of 1986 (SARA)). In 1990, the US Technology Policy was announced. This policy placed a renewed emphasis on making the best use of technology in achieving the national goals of improved quality of life for all Americans, continued economic growth, and national security. In the spirit of the technology policy, the Agency began to direct a portion of its resources toward the promotion, recognition, acceptance, and use of US-developed innovative environmental technologies both domestically and abroad. Decision Support Software (DSS) packages integrate environmental data and simulation models into a framework for making site characterization, monitoring, and cleanup decisions. To limit the scope which will be addressed in this demonstration, three endpoints have been selected for evaluation: Visualization; Sample Optimization; and Cost/Benefit Analysis. Five topics are covered in this report: the objectives of the demonstration; the elements of the demonstration plan; an overview of the Site Characterization and Monitoring Technology Pilot; an overview of the technology verification process; and the purpose of this demonstration plan.

SULLIVAN,T.; ARMSTRONG,A.

1998-09-01T23:59:59.000Z

350

Improve emissions monitoring  

SciTech Connect (OSTI)

Marathon`s Texas City refinery was subject to five separate EPA regulations in addition to a state program for monitoring and repairing fugitive leaks. In this case history, the refinery sought an organizational solution that reduced monitoring costs and kept the facility fully compliant with current state and federal regulations. Equally important, the new monitoring program incorporated flexibility for future emission-reduction requirements. The paper describes the solution, regulatory background, the previous system, leak-threshold consolidation, operator ownership, and projects benefits.

Vining, S.K. [Marathon Oil Co., Texas City, TX (United States)

1998-01-01T23:59:59.000Z

351

NETL: Ambient Monitoring - Steubenville Comprehensive Air Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Steubenville Comprehensive Air Monitoring Project (SCAMP) Steubenville Comprehensive Air Monitoring Project (SCAMP) The National Ambient Air Quality Standards for airborne fine particles (PM2.5) are based on the mass of PM2.5 measured at outdoor monitoring stations; however, most people spend the majority of their time indoors. In order to fully understand the relationship between ambient PM2.5 and human health effects, it is important to define how ambient PM2.5 concentrations and compositions compare to those actually breathed by humans during normal daily activities. The objective of SCAMP is to measure the concentrations of PM2.5 and other potential air pollutants at ambient monitoring stations in and around Steubenville, OH, and relate them to the pollutant concentrations in air that is actually breathed by people living in the area. Steubenville was chosen by DOE for this study because of the ability to integrate its results with those of the UORVP, and also because Steubenville was one of the six cities where correlations between ambient PM2.5 mass and adverse health effects had been noted. These correlations had been cited by EPA as one of the primary justifications for its 1997 ambient PM2.5 standards. Complete characterization of the relationships between ambient PM2.5 and human exposure, including the chemical components of PM2.5 at various locations, will provide a comprehensive database for use in subsequent epidemiological studies, long-range transport studies, and State Implementation Program development. CONSOL Energy is the primary performer of SCAMP, and will provide the necessary coordination and data integration between the various components of the study.

352

The Groundwater Performance Assessment Project Quality Assurance Plan  

SciTech Connect (OSTI)

U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratorys Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

Luttrell, Stuart P.

2006-05-11T23:59:59.000Z

353

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

354

Hanford facility contingency plan  

SciTech Connect (OSTI)

The Hanford Facility Contingency Plan, together with each TSD unit- specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. Applicability of this plan to Hanford Facility activities is described in the Hanford Facility RCRA Permit, Dangerous Waste Portion, General Condition II.A. General Condition II.A applies to Part III TSD units, Part V TSD units, and to releases of hazardous substances which threaten human health or the environment. Additional information about the applicability of this document may also be found in the Hanford Facility RCRA Permit Handbook (DOE/RL-96-10). This plan includes descriptions of responses to a nonradiological hazardous substance spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. The term hazardous substances is defined in WAC 173-303-040 as: ``any liquid, solid, gas, or sludge, including any material, substance, product, commodity, or waste, regardless of quantity, that exhibits any of the physical, chemical or biological properties described in WAC 173-303-090 or 173-303-100.`` Whenever the term hazardous substances is used in this document, it will be used in the context of this definition. This plan includes descriptions of responses for spills or releases of hazardous substances occurring at areas between TSD units that may, or may not, threaten human health or the environment.

Sutton, L.N.

1996-07-01T23:59:59.000Z

355

Environmental protection Implementation Plan  

SciTech Connect (OSTI)

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

356

Walkability Planning in Jakarta  

E-Print Network [OSTI]

Integrated accessibility strategy and design Legibility Integrated activity Shared spaces Strategy 1: Policy Pedestrian planning as constituency buildingIntegrated activity study Inclusive road designation WikiPlaces pedestrian network mapping Vernacular placemaking and Asian shared street design Pedestrian planning as constituency building

Lo, Ria S. Hutabarat

2011-01-01T23:59:59.000Z

357

ENERGY EMERGENCY RESPONSE PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION ENERGY EMERGENCY RESPONSE PLAN COMMISSIONREPORT October 2006 CEC-600-2006-014 Arnold Schwarzenegger, Governor #12;CALIFORNIA ENERGY COMMISSION Jackalyne Pfannenstiel Chairman James D Deputy Director FUELS AND TRANSPORTATION DIVISION #12;The Energy Emergency Response Plan is prepared

358

Corporate Plan Corporate Plan 2008-2011  

E-Print Network [OSTI]

Planned Income and Expenditure 26 Performance Measures Table 3 - Key Agency Targets 27 #12;3 | Corporate the difference between income raised and expenditure incurred. We operate in accordance with full resource levied on the capital value tied up in the national forest estate. The 2007 Spending Review allocated

359

Monitoring Jobs on Hopper  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Jobs Monitoring Jobs Monitoring Jobs Monitoring Hopper Batch Jobs See the man pages for more options. The Job Information page has more information on current queue status, completed jobs, ALPS logs and job summary statistics. Job Commands Command Description qsub batch_script Submits batch script to the queue. The output of qsub will be a jobid qdel jobid Deletes a job from the queue qhold jobid Puts a job on hold in the queue. To delete a job from the hopper xfer queue users must add an additional parameter @hopper06 Example:6004861.hopper06@hopper06 qrls jobid Releases a job from hold. qalter [options] jobid Change attributes of submitted job. (See below.) qmove new_queue jobid Move job to new queue. Remember, the new queue must be one of the submission queues (premium, regular, or low)

360

Structural Health Monitoring Tools  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Security, LLC 1 LA-CC-10-032 LA-UR 10-01259 1 Introduction to SHMTools SHMTools is a MATLAB package that facilitates the construction of structural health monitoring (SHM)...

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

PROJECT PLANNING TEMPLATE  

Broader source: Energy.gov (indexed) [DOE]

Plan i Issue Date: 4/24/2009 Plan i Issue Date: 4/24/2009 U.S. Department of Energy Office of Engineering and Construction Management Project Plan for the Project Assessment and Reporting System (PARS II) Version 2.0a (Public) April 20, 2009 Submitted by: Energy Enterprises Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net PARS II Project Plan ii Issue Date: 4/24/2009 Title Page Document Name: Project Plan for the Project Assessment and Reporting System (PARS II), V2.0a Publication Date: April 24, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Judith Bernsen, PMC, LLC Kai Mong, Energy Enterprise Solutions, LLC

362

Commissioning Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Checkout, Testing, and Checkout, Testing, and Commissioning Plan Review Module March 2010 CD-0 O Ch 0 OFFICE OF heckout, T C CD-1 F ENVIRON Standard R Testing, a Revi Critical Decis CD-2 Ma NMENTAL Review Plan and Com iew Module sion (CD) Ap CD arch 2010 L MANAGE n (SRP) mmissioni e pplicability D-3 EMENT ing Plan CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

363

South Texas Planning Region Public Transportation Coordination Plan  

E-Print Network [OSTI]

KFH GROUP, INC. SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION COORDINATION PLAN Developed for the: SOUTH TEXAS DEVELOPMENT COUNCIL ECONOMIC DEVELOPMENT PROGRAM By: KFH Group, Incorporated December.................................................................................................................................1 PLAN PROCESS .............................................................................................................................3 GOALS AND OBJECTIVES...

South Texas Development Council Economic Development Program

2006-12-15T23:59:59.000Z

364

Domain area planning utility (DAPU) for planning wireless battlefield networks  

Science Journals Connector (OSTI)

We describe the key design concepts of Domain Area Planning Utility (DAPU) developed by the PILSNER program to perform high-speed automated planning of Future Battlefield Networks (FBNs). DAPU processes multiple inputs from Resource Planning such as ...

Mariusz A. Fecko; John Unger; Sunil Samtani; Douglas Davey; Andrzej Cichocki; Bill Biagini; Paul Rego; Rick Stewart; Aristides Staikos

2009-10-01T23:59:59.000Z

365

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan  

E-Print Network [OSTI]

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

366

Structure function monitor  

DOE Patents [OSTI]

Methods and apparatus for a structure function monitor provide for generation of parameters characterizing a refractive medium. In an embodiment, a structure function monitor acquires images of a pupil plane and an image plane and, from these images, retrieves the phase over an aperture, unwraps the retrieved phase, and analyzes the unwrapped retrieved phase. In an embodiment, analysis yields atmospheric parameters measured at spatial scales from zero to the diameter of a telescope used to collect light from a source.

McGraw, John T. (Placitas, NM); Zimmer, Peter C. (Albuquerque, NM); Ackermann, Mark R. (Albuquerque, NM)

2012-01-24T23:59:59.000Z

367

Federal Radiological Monitoring and Assessment Center Monitoring Manual Volume 2, Radiation Monitoring and Sampling  

SciTech Connect (OSTI)

The FRMAC Monitoring and Sampling Manual, Volume 2 provides standard operating procedures (SOPs) for field radiation monitoring and sample collection activities that are performed by the Monitoring group during a FRMAC response to a radiological emergency.

NSTec Aerial Measurement Systems

2012-07-31T23:59:59.000Z

368

Energy Efficiency Market Sustainable Business Planning | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning, a presentation...

369

2012 DOE Strategic Sustainability Performance Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

DOE Strategic Sustainability Performance Plan 2012 DOE Strategic Sustainability Performance Plan The 2012 DOE Strategic Sustainability Performance Plan embodies DOE's...

370

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

PUB-5352, Rev. 6 WM QA Plan Review and approval of changesand review of procedures, work plans, instructions, reports,Plans, Instructions and Reports9 4.1.2 Procedure Review and

Waste Management Group

2006-01-01T23:59:59.000Z

371

Renewables Portfolio Standard Procurement Plan  

E-Print Network [OSTI]

Renewables Portfolio Standard Procurement Plan November 2013 Roseville Electric 2090 Hilltop Circle Council will deliberate in public on the RPS Procurement Plan. Information distributed to the City Council regarding Roseville's renewable energy resources procurement status and future plans for consideration

372

FIRE MANAGEMENT PLAN MONTAGUE PLAIN  

E-Print Network [OSTI]

FIRE MANAGEMENT PLAN FOR MONTAGUE PLAIN WILDLIFE MANAGEMENT AREA #12;Fire Management Plan for Montague Plain Wildlife Management Area prepared for Massachusetts Dept. of Fisheries, Wildlife. 2003. Fire Management Plan for Montague Plain Wildlife Management Area. Department of Natural Resources

Schweik, Charles M.

373

EMSL Strategic Plan 2008  

SciTech Connect (OSTI)

This Strategic Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

Campbell, Allison A.

2008-08-15T23:59:59.000Z

374

EMSL Contribution Plan  

SciTech Connect (OSTI)

This Contribution Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSLs workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSLs long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2 describes EMSLs detailed business plan, including an analysis of opportunity, organizational investments, and actionable milestones.

Campbell, Allison A.

2008-12-01T23:59:59.000Z

375

Investigating the Operational Capabilities of Custom and Pedestrian Portal Monitoring Systems for Screening Livestock for Radioactive Contamination  

E-Print Network [OSTI]

animals, as well as testing pedestrian portal monitors and a newly designed livestock portal capable of radionuclide identification. It was discovered that only ten states addressed companion animals or livestock anywhere in their emergency planning...

Erchinger, Jennifer

2013-05-01T23:59:59.000Z

376

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

377

Building Technologies Office: Strategic Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plans to Strategic Plans to someone by E-mail Share Building Technologies Office: Strategic Plans on Facebook Tweet about Building Technologies Office: Strategic Plans on Twitter Bookmark Building Technologies Office: Strategic Plans on Google Bookmark Building Technologies Office: Strategic Plans on Delicious Rank Building Technologies Office: Strategic Plans on Digg Find More places to share Building Technologies Office: Strategic Plans on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education Climate-Specific Guidance Solution Center Partnerships Meetings Publications Home Energy Score Home Performance with ENERGY STAR Better Buildings Neighborhood Program Challenge Home

378

Planning for Years to Come  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

379

Transition Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and training needs for system operation and maintenance, planning for data migration, etc Transition Plan More Documents & Publications System Design Feasibility Study Report...

380

Career Planning | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Development Plan, identifying your specific career goals and how you'll acquire the knowledge and develop the skills necessary to achieve them. Career planning and professional...

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Research deciphers HIV attack plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

deciphers HIV attack plan Research deciphers HIV attack plan These findings will help inform vaccine design and interpretation of vaccine trials, and provide new insights...

382

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

383

Community Energy Stategic Planning Resources  

Broader source: Energy.gov (indexed) [DOE]

Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

384

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning  

E-Print Network [OSTI]

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning George into a microphone. Over thirteen hours of inter- action have been collected and transcribed (see (Gross, Allen

Ferguson, George

385

Policy & Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Laboratory Directed R&D Laboratory Directed R&D Office of Technology Commercialization and Partnerships Other Information BNL Site Index Can't View PDFs? Policy & Strategic Planning Directorate Policy and Strategic Planning (P&SP) Directorate coordinates development of the Laboratory Strategic Plan and annual business plans at the institutional and organizational Level. This function includes administration of the Laboratory Directed Research and Development (LDRD) program. The Directorate is also responsible for the Laboratory's technology transfer functions, including collaborations with industry and work for others; and for increasing funding from sources other than DOE. Organization Chart (pdf) Top of Page Last Modified: June 4, 2013 Please forward all questions about this site to: Teresa Baker

386

DOE Retro Analysis Plan  

Broader source: Energy.gov (indexed) [DOE]

Retro Analysis Plan Retro Analysis Plan August 2, 2011 Page 1 August 2, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Preliminary Plan for Retrospective Analysis Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the July 11, 2011 Federal Register requesting comments on the Preliminary Plan for Retrospective Analysis of Existing Rules. We are encouraged by DOE's efforts to implement Executive Order 13563. We appreciate the actions already taken by DOE to address our concerns regarding the Final Rule on Certification, Compliance, and Enforcement Regulations for Consumer Products and Commercial and

387

Plan Your School Visit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Your School Visit Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit Chaperones To ensure that your students have the best possible experience at the Museum, we ask that you provide one chaperone for every 6 children. The chaperones should stay with their assigned group of students throughout the entire visit and model positive behavior. General Before arriving at the Museum, please remind your students about the following guidelines: If possible, leave food and drinks on the bus. Respect other visitors in the Museum by using inside voices, walking, etc. Please be gentle with the exhibits. Cameras are welcome at the Bradbury Science Museum. Have fun! Upon your arrival

388

CURRICULUM VITAE RESEARCH PLAN  

E-Print Network [OSTI]

CURRICULUM VITAE & RESEARCH PLAN Erik Schwartz Sørensen Ph. D. Theoretical Condensed Matter Physics Contents Curriculum vitae 3 Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Recent Invited Talks 21 Referees 22 #12; Erik Sørensen February 19, 2001 3 Curriculum vitae

Sørensen, Erik S.

389

Financial Planning Resource Allocation  

E-Print Network [OSTI]

Financial Planning Resource Allocation Human Resources Administrative Services Recruitment Management Leadership Studies Minor Admissions Information Desk & Game Center Fraternity/Sorority Life & Cross-Cultural Support Board Dining Medical Services Liaison for Faculty, Staff & Scholarships Retail

Barrash, Warren

390

Advance Care Planning Safeguards  

Science Journals Connector (OSTI)

To the Editors:We read with interest the recent article by Dr. Billings.1...In the article, Dr. Billings defines the goal of advance care planning as promoting the autonomy of decisionally incapac...

Sangeeta C. Ahluwalia PhD; MPH; Howard S. Gordon MD

2012-11-01T23:59:59.000Z

391

Developing a Marketing Plan  

E-Print Network [OSTI]

Developing a good marketing plan will help you identify and quantify costs, set price goals, determine potential price outlook, examine production and price risk, and develop a strategy for marketing your crop. This publication describes...

Bevers, Stan; Waller, Mark L.; Amosson, Stephen H.; McCorkle, Dean

2009-03-02T23:59:59.000Z

392

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

393

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

394

Technical Planning Basis  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Cancels DOE G 151.1-1, Volume 2.

2007-07-11T23:59:59.000Z

395

2014- 2018 Strategic Plan  

Broader source: Energy.gov [DOE]

In April 2014, The Department of Energy released its 2014 - 2018 strategic plan, a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by...

396

Strategic Plan: Implementation and  

E-Print Network [OSTI]

Findings From: Planning Interviews Stakeholder Survey Environmental Assessment Refine Mission and Vision Define Goals with Measurable Outcomes Develop Specific Strategies & Tactics Finalize;Improving lives and transforming healthcare.* Mission Statement ­ "Core Purpose" Vision Statement

Nguyen, Danh

397

Milestone Plan Process Improvement  

Broader source: Energy.gov (indexed) [DOE]

Milestone Plan Process Improvement Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues surrounding this process. We concluded that the MP process could be improved for most users by tuning the system configuration. With the approval of both the STRIPES Executive Steering Committee and the STRIPES Project Office, we launched the MP Process Improvement Initiative. After many meetings with members of the STRIPES Team and Working Group, we are ready to "go-live" with this initiative. On October 1 st , 2012 the new MP process will be implemented for use by most field offices.

398

Lawrence Livermore National Laboratory Site Lead Planning Activities, October 2012  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Report Number: HIAR LLNL-2012-10-23 Site: Lawrence Livermore National Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Site Lead Planning Activities at the Lawrence Livermore National Laboratory Dates of Activity 10/23/2012 - 10/24/2012 Report Preparer: Robert Freeman Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) Independent Oversight activity was to maintain site operational awareness of key nuclear safety performance areas, monitor ongoing site oversight and planning activities for Lawrence Livermore National Laboratory (LLNL) nuclear facilities, and identify and initiate coordination of future HSS oversight activities at the site, including planned HSS targeted reviews planned for Fiscal Year (FY) 2013.

399

EIS-0350-S1: Mitigation Action Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Mitigation Action Plan Mitigation Action Plan EIS-0350-S1: Mitigation Action Plan Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement Project at Los Alamos National Laboratory, Los Alamos, NM This Mitigation Action Plan (MAP) describes mitigation and monitoring commitments for constructing and operating the Modified CMRR-NF. The commitments made in this MAP are designed to mitigate potentially adverse environmental consequences associated with the CMRR-NF Project as the CMRR-NF is constructed and operated, and as direct, indirect, and cumulative impacts from these actions occur over time. EIS-0350-S1-MAP-2011.pdf More Documents & Publications EIS-0350-S1: Final Supplemental Environmental Impact Statement EIS-0350-S1: Draft Supplemental Environmental Impact Statement

400

Energy Efficiency Evaluation and Planning for Existing Buildings |  

Broader source: Energy.gov (indexed) [DOE]

Energy Energy Efficiency Evaluation and Planning for Existing Buildings Energy Efficiency Evaluation and Planning for Existing Buildings October 4, 2013 - 4:51pm Addthis For meeting Federal sustainability requirements, agencies can use evaluation methods-such as benchmarking and energy audits-and planning to make their existing buildings energy efficient. To comply with energy reduction requirements agencies should follow a few basic steps: Benchmark buildings Conduct energy audits Create an action plan Monitor progress. This is a cyclical process that will need to be continually updated. For meeting water use reduction requirements in buildings, see Water Efficiency. Benchmark Buildings The first step in managing a building stock's sustainability is to benchmark buildings. Benchmarking allows buildings to be compared for

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Nevada Test Site Resource Management Plan: Annual summary, January 2000  

SciTech Connect (OSTI)

The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

NONE

2000-01-01T23:59:59.000Z

402

Lawrence Livermore National Laboratory Site Lead Planning Activities, October 2012  

Broader source: Energy.gov (indexed) [DOE]

Report Number: HIAR LLNL-2012-10-23 Site: Lawrence Livermore National Laboratory Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Site Lead Planning Activities at the Lawrence Livermore National Laboratory Dates of Activity 10/23/2012 - 10/24/2012 Report Preparer: Robert Freeman Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) Independent Oversight activity was to maintain site operational awareness of key nuclear safety performance areas, monitor ongoing site oversight and planning activities for Lawrence Livermore National Laboratory (LLNL) nuclear facilities, and identify and initiate coordination of future HSS oversight activities at the site, including planned HSS targeted reviews planned for Fiscal Year (FY) 2013.

403

Energy Efficiency Evaluation and Planning for Existing Buildings |  

Broader source: Energy.gov (indexed) [DOE]

Program Areas » Sustainable Buildings & Campuses » Energy Program Areas » Sustainable Buildings & Campuses » Energy Efficiency Evaluation and Planning for Existing Buildings Energy Efficiency Evaluation and Planning for Existing Buildings October 4, 2013 - 4:51pm Addthis For meeting Federal sustainability requirements, agencies can use evaluation methods-such as benchmarking and energy audits-and planning to make their existing buildings energy efficient. To comply with energy reduction requirements agencies should follow a few basic steps: Benchmark buildings Conduct energy audits Create an action plan Monitor progress. This is a cyclical process that will need to be continually updated. For meeting water use reduction requirements in buildings, see Water Efficiency. Benchmark Buildings The first step in managing a building stock's sustainability is to

404

Site Sustainability Plan  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy U.S. Department of Energy Office of Legacy Management December 2013 LMS/S07225 This page intentionally left blank This page intentionally left blank U.S. Department of Energy Site Sustainability Plan December 2013 Doc. No. S07225 Page i Contents Abbreviations ................................................................................................................................. iii I. Executive Summary ...............................................................................................................1 II. Performance Review and Plan Narrative ...............................................................................9 1 GHG Reduction and Comprehensive GHG Inventory ...........................................................9

405

Greenhouse Gas Mitigation Planning  

Broader source: Energy.gov [DOE]

The Greenhouse Gas (GHG) Mitigation Planning section provides Federal agency personnel with guidance to achieve agency GHG reduction goals in the most cost-effective way. Using a portfolio-based management approach for GHG mitigation planning, agencies will be able to prioritize strategies for GHG mitigation. Agencies can also use this guidance to set appropriate GHG reduction targets for different programs and sites within an agency.

406

Lubbock Metropolitan Transportation Plan  

E-Print Network [OSTI]

in the foreground and the Lubbock Area Veterans Memorial in the background EXECUTIVE SUMMARY This Metropolitan Transportation Plan was developed based upon the four Lubbock Metropolitan Planning Organization?s (MPO) goals of Improve Safety ? Congestion...: researching proposed routes; studying environmental impacts; performing engineering surveys; holding public hearings; signing agreements with the counties or cities (if needed to fulfill state or federal requirements); acquiring right-of-way; producing...

Lubbock Metropolitan Planning Organization

2007-09-18T23:59:59.000Z

407

United States Environmental Monitoring  

Office of Legacy Management (LM)

EPA 60014-91/030 EPA 60014-91/030 Environmental Protection Systems Laboratory DOE/DP00539-063 Agency P.O. Box 93478 Las Vegas NV 891 93-3478 Research and Development Offsite Environmental Monitoring Report: 1 - 3 5 Radiation Monitorina Around * / (- P 7 1 United States ~ u c l g a r Test Areas Calendar Year 1990 This page intentionally left blank EPN60014-90 DOWDP Offsite Environmental Monitoring Report: Radiation Monitoring Around United States Nuclear Test Areas, Calendar Year 1990 Contributors: D.J. Chaloud, B.B. Dicey, D.G. Easterly, C.A. Fontana, R.W. Holloway, A.A. Mullen, V.E. Niemann, W.G. Phillips, D.D. Smith, N.R. Sunderland, D.J. Thome, and Nuclear Radiation Assessment Division Prepared for: U.S. Department of Energy under Interagency Agreement Number DE-A108-86-NV10522

408

Overview - WIPP Effluent Monitoring  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Overview of the WIPP Effluent Monitoring Program Compliance with Title 40 CFR Part 191, Subpart A Environmental Standards for Management and Storage L. Frank-Supka, D. J. Harward, S. C. Casey May 2005 INTRODUCTION This document provides an overview of the effluent air monitoring activities at the Waste Isolation Pilot Plant (WIPP), in Carlsbad, New Mexico. The WIPP Effluent Monitoring Program is designed to comply with the U.S. Environmental Protection Agency (EPA) radiation protection standards for management and storage of spent nuclear fuel, high-level radioactive waste and transuranic (TRU)-waste at the WIPP. The standards issued by the EPA are contained in Title 40 Code of Federal Regulations (CFR), Part 191, Subpart A. The standards require the

409

Monitoring Jobs on Carver  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring Jobs Monitoring Jobs Monitoring Jobs Overview Please see the man pages of the commands below for more options. The Job Information page has more information on current queue status, completed jobs, and job summary statistics. Command Description qsub batch_script Submit batch script to queue; returns job_id. qdel job_id Delete job from queue. qhold job_id Place job on hold in queue. qrls job_id Release held job. qalter Change attributes of submitted job. qmove new_queue job_id Move job to a different queue. qstat -a List jobs in submission order. qstat -f job_id Produce detailed report about job. qs List jobs in priority order. showq List jobs in priority order, categorized by job state. showstart job_id Produce estimate of start time for job. checkjob job_id Produce scheduling diagnostics for job.

410

Umatilla Hatchery Monitoring and Evaluation, 1998-1999 Annual Report.  

SciTech Connect (OSTI)

The Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program authorized construction of Umatilla Fish Hatchery (UFH) in 1986. Measure 703 of the program amended the original authorization for the hatchery and specified evaluation of the Michigan (MI) raceways using oxygen supplementation to reach production goals of 290,000 lb of chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss). The hatchery was completed in fall 1991. Partial justification for the hatchery was to evaluate new production and supplementation techniques. MI raceways at UFH increase smolt production with a limited water supply. Test results for MI raceways will have systematic application in the Columbia River basin. The UFH is the foundation for rehabilitating chinook salmon and enhancing steelhead in the Umatilla River (CTUIR and ODFW 1990) and is expected to contribute significantly to the Northwest Power Planning Council's goal of doubling salmon production in the Columbia Basin. Hatchery production goals and a comprehensive monitoring and evaluation plan were presented in the Umatilla Hatchery Master Plan (CTUIR and ODFW 1990). The Comprehensive Plan for Monitoring and Evaluation of Umatilla Hatchery (Carmichael 1990) was approved by the Northwest Power Planning Council as a critical adaptive management guide for fisheries rehabilitation in the Umatilla River. Monitoring and evaluation will be used to increase knowledge about uncertainties inherent in the fisheries rehabilitation and will complement the developing systematic monitoring and evaluation program. The monitoring and evaluation goals are: (1) Provide information and recommendations for the culture and release of hatchery fish, harvest regulations, and natural escapement to accomplish long-term natural and hatchery production goals in the Umatilla River basin that are consistent with provisions of the Council's Columbia River Basin Fish and Wildlife Program. (2) Assess the success of achieving the management objectives in the Umatilla River basin that are presented in the Master Plan and the Comprehensive Rehabilitation Plan. A substantial proportion of the production at UFH is reared in MI raceways. This system has not been thoroughly evaluated to determine the effects on Smolt-to-adult survival (SAS). In addition, the rearing strategies proposed for spring chinook salmon require an unusually extensive period of incubation in chilled well water. Extensive background and justification for UFH monitoring and evaluation is presented in Carmichael (1990). In this report, we present findings for the UFH Monitoring and Evaluation Project from 1 November 1998 to 31 October 1999. We designed our program to evaluate fish cultural practices, conduct rearing and survival studies, assess sport fisheries, and provide information for planning and coordination. Additional studies have been designed for fall chinook salmon to evaluate straying and the effects of tagging. We monitored the culture and performance of more than 3.2 million chinook salmon and steelhead produced at UFH in 1997-98 (Appendix Tables A1-8). Individual stock profiles, release, performance, and return data of previously released groups are presented in the following sections.

Stonecypher, R. Wess; Groberg, Jr., Warren J.; Farman, Brett M. (Oregon Department of Fish and Wildlife, Portland, OR)

2001-07-01T23:59:59.000Z

411

OSU Bicycle Plan 2/10 OSU Bicycle Plan  

E-Print Network [OSTI]

OSU Bicycle Plan 2/10 DRAFT OSU Bicycle Plan Introduction Goals and Performance Measures (statistics and data points) Bicycle Network (circulation and parking) Bicycle Programs (incentives, outreach, education and enforcement) Improvement Plan #12;OSU Bicycle Plan 2/10 Introduction The 2010 Oregon State

Escher, Christine

412

Neutral beam monitoring  

DOE Patents [OSTI]

Method and apparatus for monitoring characteristics of a high energy neutral beam. A neutral beam is generated by passing accelerated ions through a walled cell containing a low energy neutral gas, such that charge exchange neutralizes the high energy ion beam. The neutral beam is monitored by detecting the current flowing through the cell wall produced by low energy ions which drift to the wall after the charge exchange. By segmenting the wall into radial and longitudinal segments various beam conditions are further identified.

Fink, Joel H. (Livermore, CA)

1981-08-18T23:59:59.000Z

413

Monitoring and Assessment of Greenhouse Gas Emissions and Mitigation  

Open Energy Info (EERE)

Greenhouse Gas Emissions and Mitigation Greenhouse Gas Emissions and Mitigation Potential in Agriculture Jump to: navigation, search Logo: Monitoring and Assessment of Greenhouse Gas Emissions and Mitigation Potential in Agriculture (MAGHG) Name Monitoring and Assessment of Greenhouse Gas Emissions and Mitigation Potential in Agriculture (MAGHG) Agency/Company /Organization Food and Agriculture Organization of the United Nations Sector Climate, Land Focus Area Agriculture, Greenhouse Gas Topics GHG inventory, Low emission development planning, -LEDS Resource Type Dataset, Technical report Website http://www.fao.org/climatechan References MICCA Website[1] The overall objective of the MAGHG project is to support developing countries assess and report their greenhouse gas (GHG) emissions from

414

Downhole Vibration Monitoring and Control System  

SciTech Connect (OSTI)

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. The key feature of this system is its use of a magnetorheological fluid (MRF) to allow the damping coefficient to be changed extensively, rapidly and reversibly without the use of mechanical valves, but only by the application of a current. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. Much of the effort was devoted to the design and testing of the MRF damper, itself. The principal objectives of Phase II were: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in a drilling laboratory. Phase II concluded on January 31, 2006, and a final report was issued. Work on Phase III of the project began during the first quarter, 2006, with the objectives of building precommercial prototypes, testing them in a drilling laboratory and the field; developing and implementing a commercialization plan. All of these have been accomplished. The Downhole Vibration Monitoring & Control System (DVMCS) prototypes have been successfully proven in testing at the TerraTek drilling facility and at the Rocky Mountain Oilfield Test Center (RMOTC.) Based on the results of these tests, we have signed a definitive development and distribution agreement with Smith, and commercial deployment is underway. This current version of the DVMCS monitors and controls axial vibrations. Due to time and budget constraints of this program, it was not possible to complete a system that would also deal with lateral and torsional (stick-slip) vibrations as originally planned; however, this effort is continuing without DOE funding.

Martin E. Cobern

2007-09-30T23:59:59.000Z

415

Optimal Interdiction of Attack Plans Joshua Letchford  

E-Print Network [OSTI]

Economics, Security, Algorithms Keywords Game theory, security, planning, plan interdiction 1. INTRODUCTION

Vorobeychik, Eugene

416

Windward Community College Strategic Plan  

E-Print Network [OSTI]

.......................................................1 II. DESCRIPTION OF THE COLLEGE PLANNING PROCESS.......................................3 A with career exploration, technolo

417

UNL CAMPUS & LANDSCAPE MASTER PLANS  

E-Print Network [OSTI]

are to both support the upkeep and maintenance of existing landscapes on campus and to support the designPLAN BIG UNL CAMPUS & LANDSCAPE MASTER PLANS NOVEMBER 2013 #12;#12;PLAN BIG ARCHITECTURAL AND LANDSCAPE GUIDELINES #12;4 #12;5 TABLE OF CONTENTS INTRODUCTION Purpose and Introduction 6 The Plan Big

Farritor, Shane

418

REVIEW PLAN PINE CREEK LAKE  

E-Print Network [OSTI]

#12;REVIEW PLAN PINE CREEK LAKE McCurtain County, Oklahoma DAM SAFETY MODIFICATION STUDY TULSA LEFT BLANK #12;REVIEW PLAN Pine Creek Lake, Oklahoma Dam Safety Modification Study TABLE OF CONTENTS and Costs 17 13. Public Participation 19 14. Review Plan Approval and Updates 19 15. Review Plan Points

US Army Corps of Engineers

419

EIS-0472: Mitigation Action Plan  

Broader source: Energy.gov [DOE]

Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

420

Plans, Implementation, and Results Glossary  

Office of Energy Efficiency and Renewable Energy (EERE)

Definitions of the office overview, plans, implementation, and results document and website categories are provided below:

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Bridge Monitoring and Loading  

E-Print Network [OSTI]

#12;1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling simulations were conducted for a range of stone arch bridges spanning 5.0m to 32m. Traditional assessment procedures for the determination of both longitudinal and transverse bridge strengths were developed

422

Bridge Monitoring and Loading  

E-Print Network [OSTI]

1 Bridge Monitoring and Loading P. Fanning, E. OBrien Stone Arch Bridges - Modelling and Assessment dimensional non- linear finite element simulations of a range of stone arch- bridges spanning 5.0m to 32m and novel assessment proce- dures for the determination of both longitudinal andtrans- verse bridge

423

Luminosity monitor at PEP  

SciTech Connect (OSTI)

The luminosity monitor system utilized by the MKII Detector and by the PEP operators is described. This system processes information from 56 photomultipliers and calculates independent luminosities for each of the 3 colliding bunches in PEP. Design considerations, measurement techniques, and sources of error in the luminosity measurement are discussed.

Fox, J.D.; Franklin, M.E.B.

1981-02-01T23:59:59.000Z

424

CERN GSM monitoring system  

E-Print Network [OSTI]

As a result of the tremendous development of GSM services over the last years, the number of related services used by organizations has drastically increased. Therefore, monitoring GSM services is becoming a business critical issue in order to be able to react appropriately in case of incident. In order to provide with GSM coverage all the CERN underground facilities, more than 50 km of leaky feeder cable have been deployed. This infrastructure is also used to propagate VHF radio signals for the CERNs fire brigade. Even though CERNs mobile operator monitors the network, it cannot guarantee the availability of GSM services, and for sure not VHF services, where signals are carried by the leaky feeder cable. So, a global monitoring system has become critical to CERN. In addition, monitoring this infrastructure will allow to characterize its behaviour over time, especially with LHC operation. Given that commercial solutions were not yet mature, CERN developed a system based on GSM probes and an application...

Ghabrous Larrea, C

2009-01-01T23:59:59.000Z

425

MONITORING DROUGHT Basic Climatology  

E-Print Network [OSTI]

MONITORING DROUGHT Basic Climatology Colorado Climate Center Funding provided by NOAA Sectoral? Streamflow? Plants wilting? Wildfire? Famine? Other? #12;Drought seems so obvious... Yet it remains of 2002 Drought -- Colorado's worst recent Drought August, 2002 #12;Percentage of US in Drought (D1-D4

426

CONTAMINANT MONITORING & RESEARCH SANFRANCISCOESTUARYINSTITUTE  

E-Print Network [OSTI]

supposed to be the conversion of DBW hardcopy monitoring data to electronic format, the data was already in electronic format. However, additional analysis of this data was necessary and a Tier 1 risk assessment................................................................................................ 5 Toxicity Reference Values for Risk Quotient Calculations

427

Realtime Webbased Telerehabilitation Monitoring  

E-Print Network [OSTI]

Therapy Abstract. Distance monitoring of rehabilitation exercises has been primarily conducted using two level of effort. The top of the screen displays messages, which the patient's application relays was tested with two subjects during a pilot trial in which the RARS was used to train individuals post

New Jersey, University of Medicine and Dentistry of

428

Integration plan required by performance agreement SM 7.2.1  

SciTech Connect (OSTI)

Fluor Daniel Hanford, Inc. and its major subcontractors are in agreement that environmental monitoring performed under the Project Hanford Management Contract is to be done in accordance with a single, integrated program. The purpose of this Integration Plan for Environmental Monitoring is to document the policies, systems, and processes being put in place to meet one key objective: manage and integrate a technically competent, multi-media ambient environmental monitoring program, in an efficient, cost effective manner. Fluor Daniel Hanford, Inc. and its major subcontractors also commit to conducting business in a manner consistent with the International Standards Organization 14000 Environmental Management System concepts. Because the integration of sitewide groundwater monitoring activities is managed by the Environmental Restoration Contractor, groundwater monitoring it is outside the scope of this document. Therefore, for the purpose of this Integration Plan for Environmental Monitoring, the Integrated Environmental Monitoring Program is defined as applicable to all environmental media except groundwater. This document provides recommendations on future activities to better integrate the overall environmental monitoring program, with emphasis on the near-field program. In addition, included is the Fluor Daniel Hanford, Inc. team review of the environmental monitoring activities on the Hanford Site, with concurrence of Pacific Northwest National Laboratory and Bechtel Hanford, Inc. (The narrative provided later in the Discussion Section describes the review and consideration given to each topic.) This document was developed to meet the requirements of the Project Hanford Management Contract performance agreement (SM7.2) and the tenets of the U.S. Department of Energy's Effluent and Environmental Monitoring Planning Process. This Plan is prepared for the U.S. Department of Energy, Richland Operations Office, Environmental Assurance, Permits, and Policy Division to complete the requirements specified in the Performance Expectation 7.2.1, within the SM7 Environmental, Safety, and Health section of the Project Hanford Management Contract.

Diediker, L.P.

1997-03-28T23:59:59.000Z

429

Agent Program Planning Information Money Smart  

E-Print Network [OSTI]

Agent Program Planning Information Money Smart http participated in Money Smart classes: Habitat for Humanity, Head Start, workforce center clients, adult Planning Model plans have been developed for a Money Smart outcome plan and a Money Smart output plan

430

Lessons from UNSCOM and IAEA regarding remote monitoring and air sampling  

SciTech Connect (OSTI)

In 1991, at the direction of the United Nations Security Council, UNSCOM and IAEA developed plans for On-going Monitoring and Verification (OMV) in Iraq. The plans were accepted by the Security Council and remote monitoring and atmospheric sampling equipment has been installed at selected sites in Iraq. The remote monitoring equipment consists of video cameras and sensors positioned to observe equipment or activities at sites that could be used to support the development or manufacture of weapons of mass destruction, or long-range missiles. The atmospheric sampling equipment provides unattended collection of chemical samples from sites that could be used to support the development or manufacture of chemical weapon agents. To support OMV in Iraq, UNSCOM has established the Baghdad Monitoring and Verification Centre. Imagery from the remote monitoring cameras can be accessed in near-real time from the Centre through RIF communication links with the monitored sites. The OMV program in Iraq has implications for international cooperative monitoring in both global and regional contexts. However, monitoring systems such as those used in Iraq are not sufficient, in and of themselves, to guarantee the absence of prohibited activities. Such systems cannot replace on-site inspections by competent, trained inspectors. However, monitoring similar to that used in Iraq can contribute to openness and confidence building, to the development of mutual trust, and to the improvement of regional stability.

Dupree, S.A.

1996-01-01T23:59:59.000Z

431

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

432

Alaska Strategic Energy Plan and Planning Handbook | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the Office of Indian Energy, is a tool for Alaska Native Villages and communities to use in achieving energy goals in both the near- and long-term. This Handbook intends to help Alaska Native leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building. The Handbook: Provides a step-by-step process that Alaska Native villages and communities may wish to use as a roadmap for discussion and decisions related to strategic energy planning and energy project prioritization Includes blank text boxes for communities to input their own

433

Wireless device monitoring systems and monitoring devices, and associated methods  

DOE Patents [OSTI]

Wireless device monitoring systems and monitoring devices include a communications module for receiving wireless communications of a wireless device. Processing circuitry is coupled with the communications module and configured to process the wireless communications to determine whether the wireless device is authorized or unauthorized to be present at the monitored area based on identification information of the wireless device. Methods of monitoring for the presence and identity of wireless devices are also provided.

McCown, Steven H; Derr, Kurt W; Rohde, Kenneth W

2014-05-27T23:59:59.000Z

434

DRAFT Bear Safety Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bear Safety Plan June 2010 Bear Safety Plan June 2010 NSA_bsp_Rev9.doc 1 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Bear Safety Plan Background As a major part of DOE's participation in the US Global Change Research Program (USGCRP), the North Slope of Alaska (NSA) and Adjacent Arctic Ocean (AAO) Climate Research Facility (ACRF) exists on the North Slope of Alaska with its Central Facility near the town of Barrow. A secondary facility exists at Atqasuk, a town 100km inland from Barrow. Other instrumentation locations in more remote areas on the North Slope may be established in later stages of the project. Polar bears, and to a lesser extent, brown bears (barren ground grizzly) are significant hazards within the ACRF/NSA/AAO

435

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Baselines - Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP) for WBS 1.4 (FDH 1998). These cost and schedule details will provide the basis for a baseline change request that will be processed to revise the MYWP, consistent with the accelerated project plan presented below. 6.1 Project Baseline Overview This section of the IPMP presents the PFP baseline cost and schedule summary. The currently approved PFP Stabilization and

436

Report: Strategic Planning Impacts  

Broader source: Energy.gov (indexed) [DOE]

Strategic Planning Impacts Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM complex will also help to lower overall lifecycle costs, create jobs, and allow the program to capitalize on its past successes. Implementation of ARRA is a high-visibility endeavor that has the potential to impact the EM base program's day-to-day operations and processes.

437

IT Capital Planning  

Broader source: Energy.gov (indexed) [DOE]

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Peter Lenentine, Director IM Organization Structure (as of 12/19/2013) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) TheAnne Gordon Technology Evaluation Office (IM-50) Peter Tseronis, Director (Acting) Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services John Berthiaume (Acting) Human Capital and Administrative

438

Customer Service Plan  

Broader source: Energy.gov (indexed) [DOE]

Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public by relaunching Energy.gov, making it an interactive, streamlined information platform. In April, President Obama directed federal agencies to take this ongoing effort one step further and establish Customer Service Plans, improving the public's interactions with the

439

INL Executable Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ID-11383 ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 (This Page Intentionally Left Blank) DOE/ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 Prepared for the U.S. Department of Energy DOE Idaho Operations Office (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report DOE/ID-11383 Revision 2 December 2010 Approved By: ~~~/ Jeffrey~USseau Fa~ 7 Dlte President and General Manager , - Bechtel BWXT Idaho, LLC Advanced Mixed Waste Treatment Project (This Page Intentionally Left Blank)

440

DOE CONTRACTOR PENSION PLANS  

Broader source: Energy.gov (indexed) [DOE]

1-13 1-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental remediation, infrastructure services and other site-specific project completion contracts. DOE-H-1002 EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation Plan The Contractor shall submit, for Contracting Officer approval, by (fill-in

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

High Risk Plan  

Broader source: Energy.gov (indexed) [DOE]

Risk Plan Risk Plan John Bashista Melissa Rider Jeff Davis Timeline to date * OMB memo on Improving Government Acquisition issued July 29, 2009 - Review existing contracts and acquisition practices to save 7% of baseline contract spending (3.5% in FY 2010 and 3.5% in FY 2011) - Reduce high risk contracts by 10% the share of dollars obligated in FY2010 - Final plan was due and submitted on November 2, 2009 - OMB reviewed and requested revision Dec 23, 2009 - Revision submitted April 21, 2010 M&Os are an Issue * With respect to reductions in high risk contracting strategies, the M&O contracts was also a challenge since the opportunity to further influence competition and contract type was highly constrained. The Department had already competed approximately 85 percent of its M&O

442

Standard Review Plan Overview  

Broader source: Energy.gov (indexed) [DOE]

Technical Framework for EM Projects Critical Decision (CD) Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission-critical projects/facilities. Coupled with this ongoing mission is the added responsibility for EM to diligently leverage and apply American Recovery and Reinvestment Act (ARRA) funds to accelerate the completion of its

443

IT Capital Planning  

Broader source: Energy.gov (indexed) [DOE]

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Carol Blackston, Director (Acting) IM Organization Structure (as of 1/13/2014) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) Russell Pereira (Acting) Associate CIO for Technology Evaluation and Chief Technology Officer (IM-50) Peter Tseronis Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services Steve Cox (Acting)

444

Human Capital Plan  

Broader source: Energy.gov (indexed) [DOE]

Plan Plan Bea Dukes Melissa Rider AHCP Issues  Decentralization of Contracting Process within DOE  In spite of MA and CFO guidance, the actual (FTE) growth of Acquisition Workforce depends on Program Office and/or site level management Recap of this year's planning process  Thanks for your efforts on the development and consolidation of this year's AHCP  Collaborative effort with most HCA level activities  A few glitches ◦ OMB Template very confusing and required much clarification ◦ Many changes throughout the process  Thanks for your patience ◦ Lesson Learned: SPE, CFO, HC and Program Offices must be in synchronization Fallout  Additional funding called out in FY11 -

445

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

446

Energy Organizational Planning  

SciTech Connect (OSTI)

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

447

Verifiable process monitoring through enhanced data authentication.  

SciTech Connect (OSTI)

To ensure the peaceful intent for production and processing of nuclear fuel, verifiable process monitoring of the fuel production cycle is required. As part of a U.S. Department of Energy (DOE)-EURATOM collaboration in the field of international nuclear safeguards, the DOE Sandia National Laboratories (SNL), the European Commission Joint Research Centre (JRC) and Directorate General-Energy (DG-ENER) developed and demonstrated a new concept in process monitoring, enabling the use of operator process information by branching a second, authenticated data stream to the Safeguards inspectorate. This information would be complementary to independent safeguards data, improving the understanding of the plant's operation. The concept is called the Enhanced Data Authentication System (EDAS). EDAS transparently captures, authenticates, and encrypts communication data that is transmitted between operator control computers and connected analytical equipment utilized in nuclear processes controls. The intent is to capture information as close to the sensor point as possible to assure the highest possible confidence in the branched data. Data must be collected transparently by the EDAS: Operator processes should not be altered or disrupted by the insertion of the EDAS as a monitoring system for safeguards. EDAS employs public key authentication providing 'jointly verifiable' data and private key encryption for confidentiality. Timestamps and data source are also added to the collected data for analysis. The core of the system hardware is in a security enclosure with both active and passive tamper indication. Further, the system has the ability to monitor seals or other security devices in close proximity. This paper will discuss the EDAS concept, recent technical developments, intended application philosophy and the planned future progression of this system.

Goncalves, Joao G. M. (European Commission Joint Research Centre, Italy); Schwalbach, Peter (European Commission Directorate General%3CU%2B2014%3EEnergy, Luxemburg); Schoeneman, Barry Dale; Ross, Troy D.; Baldwin, George Thomas

2010-09-01T23:59:59.000Z

448

EMSL Strategic Plan 2008  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7753 7753 EMSL Strategic Plan 2008 AA Campbell August 2008 Prepared for the U.S. Department of Energy's Office of Biological and Environmental Research under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 iii Environmental Molecular Sciences Laboratory Strategic Plan Our Mission EMSL, a U.S. Department of Energy national scientific user facility located at Pacific Northwest National Laboratory, provides integrated experimental and computational resources for discovery and technological innovation in the environmental molecular

449

PICs Implementation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP 04-2301 WIPP 04-2301 Passive Institutional Controls Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-2301 Passive Institutional Controls Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-2301 i Table of Contents List of Tables .....................................................................................................................ii

450

Strategic Action Plan  

Broader source: Energy.gov (indexed) [DOE]

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

451

Permanent Markers Implementation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP 04-3302 WIPP 04-3302 Permanent Markers Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-3302 ii Permanent Markers Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-3302 iii Table of Contents Table of Contents.................................................................................................

452

Plutonium Vulnerability Management Plan  

SciTech Connect (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

453

Implementing Motor Decision Plans  

E-Print Network [OSTI]

Implementing Motor Decision Plans R. Neal Elliott, Ph.D., P.E., Senior Associate American Council for an Energy-Efficient Economy (ACEEE), Washington, DC Abstract The first step to reducing energy costs and increasing reliability in motors... is chosen with limited regard to the short or long-tenn cost. This paper discusses how to develop a plan appropriate to the needs of a particular facility. Introduction In most cases, the opportunity to install a more efficient motor isO available...

Elliott, R. N.

454

Environmental protection implementation plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

455

Downhole Vibration Monitoring & Control System  

SciTech Connect (OSTI)

The objective of this program is to develop a system to both monitor the vibration of a bottomhole assembly, and to adjust the properties of an active damper in response to these measured vibrations. Phase I of this program, which entailed modeling and design of the necessary subsystems and design, manufacture and test of a full laboratory prototype, was completed on May 31, 2004. The principal objectives of Phase II were: more extensive laboratory testing, including the evaluation of different feedback algorithms for control of the damper; design and manufacture of a field prototype system; and, testing of the field prototype in a drilling laboratory. Phase II concluded on January 31, 2006, and the Phase II final report was issued. Work on Phase III of the project began during the first quarter, 2006. Efforts the current quarter have continued to focus on the manufacture of the prototype and precommercial parts, field test planning and commercialization. The continued extreme lead times quoted by oilfield machine shops for collar components significantly delayed the deployment of the prototype and precommercial units. All parts have now been received for two units, and all but one for the third. Mechanical assembly of the first two systems is complete and the electronics installation and laboratory testing will be finished in April. We have entered into a Memorandum of Understanding with a major US oilfield equipment supplier, which calls for their assisting with our field tests, in cash and in kind. We are close to signing a definitive agreement which includes the purchase of the three precommercial units. We had also signed a CRADA with the Rocky Mountain Oilfield Test Center (RMOTC), and scheduled a test at their site, The RMOTC drilling schedule continues to slip, and the test cannot begin until the first week of May. Based on these factors, we have requested a no-cost extension to July 31, 2007.

Martin E. Cobern

2007-03-31T23:59:59.000Z

456

AGR-1 Irradiation Experiment Test Plan  

SciTech Connect (OSTI)

This document presents the current state of planning for the AGR-1 irradiation experiment, the first of eight planned irradiations for the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. The objectives of the AGR-1 experiment are: 1. To gain experience with multi-capsule test train design, fabrication, and operation with the intent to reduce the probability of capsule or test train failure in subsequent irradiation tests. 2. To irradiate fuel produced in conjunction with the AGR fuel process development effort. 3. To provide data that will support the development of an understanding of the relationship between fuel fabrication processes, fuel product properties, and irradiation performance. In order to achieve the test objectives, the AGR-1 experiment will be irradiated in the B-10 position of the Advanced Test Reactor (ATR) at the Idaho National Laboratory (INL). The test will contain six independently controlled and monitored capsules. Each capsule will contain a single type, or variant, of the AGR coated fuel. The irradiation is planned for about 700 effective full power days (approximately 2.4 calendar years) with a time-averaged, volume-average temperature of approximately 1050 C. Average fuel burnup, for the entire test, will be greater than 17.7 % FIMA, and the fuel will experience fast neutron fluences between 2.4 and 4.5 x 1025 n/m2 (E>0.18 MeV).

John T. Maki

2009-10-01T23:59:59.000Z

457

Texas Rangeland Monitoring: Level Two  

E-Print Network [OSTI]

Monitoring is essential for good rangeland management. This leaflet explains how to monitor the condition of your rangeland by using line, belt and step-point transects, as well as grazing exclosures. Used consistently over time, these measures...

Hanselka, C. Wayne; Hart, Charles R.; McGinty, Allan

2006-10-09T23:59:59.000Z

458

Monitoring and Managing PDSF Jobs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Monitoring and Managing Jobs Monitoring and Managing Jobs Commonly Used Commands Action How to do it Comment Get a summary of all batch jobs sgeusers Shows a tally of all jobs for...

459

Online circuit breaker monitoring system  

E-Print Network [OSTI]

inspection and maintenance of the circuit breakers. An automated online circuit breaker monitoring system is proposed to monitor condition, operation and status of high and medium voltage circuit breakers. By tracking equipment condition, this system could...

Djekic, Zarko

2008-10-10T23:59:59.000Z

460

Online circuit breaker monitoring system  

E-Print Network [OSTI]

inspection and maintenance of the circuit breakers. An automated online circuit breaker monitoring system is proposed to monitor condition, operation and status of high and medium voltage circuit breakers. By tracking equipment condition, this system could...

Djekic, Zarko

2009-05-15T23:59:59.000Z

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Execution Monitoring in MT Icon  

Science Journals Connector (OSTI)

MT Icon allows the execution of multiple Icon programs in almost any configuration, including execution ... monitoring. As motivated in Chapter 4, MT Icon characterizes monitoring as a special case of ... languag...

Clinton L. Jeffery

1999-01-01T23:59:59.000Z

462

Antineutrino Detection for Nuclear Monitoring  

E-Print Network [OSTI]

covertly acquire these special nuclear materials from: Assembled weapons Raw uranium ore Enriched uranium antineutrino monitoring infrastructure will help avert the spread of covert nuclear reactors and weaponsAntineutrino Detection for Nuclear Monitoring Draft #12;Graphic courtesy Lawrence Livermore

Mcdonough, William F.

463

Workforce Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Policy and Guidance » Human Capital Management » Workforce Plans Policy and Guidance » Human Capital Management » Workforce Plans Workforce Plans Workforce Planning is an integral part of the human capital planning process. The intent of every workforce planning effort is to ensure that organizations have the resources necessary to meet mission requirements and program priorities. To achieve this intent, organizations must first identify and understand those mission requirements and program priorities; typically through Strategic Planning. These goals and objectives not only provide the basis for determining necessary financial resources, but they also provide the basis for determining workforce needs. For assistance with creating or modifying your workforce plans please see our Guide to Workforce Planning Documents Available for Download

464

Strategic Plans | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plans Strategic Plans Strategic Plans September 20, 2013 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. December 31, 2007 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. December 31, 2002 DOE OIG Strategic Plan Fiscal Years 2003-2008 This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energy's many programs and operations

465

Performance Plans | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Performance Plans Performance Plans Performance Plans December 13, 2013 Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal Year (FY) 2013 Annual Performance Results and FY 2014-15 Annual Performance Plan December 18, 2012 Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2012 actual performance and FYs 2013 and 2014 planned activities. November 28, 2011 Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2011 actual performance and FY 2012 planned activities.

466

Environmental Groundwater Monitoring Report  

Office of Legacy Management (LM)

-460 -460 Environmental Groundwater Monitoring Report Third Quarter, 1997 October 1997 Approved for public release; further dissemination unlimited. Environmental Restoration U.S. Department of Energy Nevada Operations Office This report has been reproduced directly from the best available copy. 1 - I : ~vailablk to DOE and DOE contractors from the. Office of Scientific - and Technical .Information, P.O. Box 62, Oak Ridge, TN 3783 1 ; prices available from (423) 576-840 1. Available to the public from the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22 16 1, telephone (703) 487-4650. RULISON SITE GROUNDWATER MONITORING REPORT THIRD QUARTER, 1997 DOE Nevada Operations Office Las Vegas, Nevada

467

Corrosion Monitoring System  

SciTech Connect (OSTI)

The Corrosion Monitoring System (CMS) program developed and demonstrated a continuously on-line system that provides real-time corrosion information. The program focused on detecting pitting corrosion in its early stages. A new invention called the Intelligent Ultrasonic Probe (IUP) was patented on the program. The IUP uses ultrasonic guided waves to detect small defects and a Synthetic Aperture Focusing Technique (SAFT) algorithm to provide an image of the pits. Testing of the CMS demonstrated the capability to detect pits with dimensionality in the sub-millimeter range. The CMS was tested in both the laboratory and in a pulp and paper industrial plant. The system is capable of monitoring the plant from a remote location using the internet.

Dr. Russ Braunling

2004-10-31T23:59:59.000Z

468

Well Monitoring Systems for EGS  

Broader source: Energy.gov [DOE]

Well Monitoring Systems for EGS presentation at the April 2013 peer review meeting held in Denver, Colorado.

469

Applications for cyber security - System and application monitoring  

SciTech Connect (OSTI)

Standard network security measures are adequate for defense against external attacks. However, many experts agree that the greater threat is from internal sources. Insiders with malicious intentions can change controller instructions, change alarm thresholds, and issue commands to equipment which can damage equipment and compromise control system integrity. In addition to strict physical security the state of the system must be continually monitored. System and application monitoring goes beyond the capabilities of network security appliances. It will include active processes, operating system services, files, network adapters and IP addresses. The generation of alarms is a crucial feature of system and application monitoring. The alarms should be integrated to avoid the burden on operators of checking multiple locations for security violations. Tools for system and application monitoring include commercial software, free software, and ad-hoc tools that can be easily created. System and application monitoring is part of a 'defense-in-depth' approach to a control network security plan. Layered security measures prevent an individual security measure failure from being exploited into a successful security breach. Alarming of individual failures is essential for rapid isolation and correction of single failures. System and application monitoring is the innermost layer of this defense strategy. (authors)

Marron, J. E. [Invensys Process Systems, 33 Commercial Street, Foxboro, MA 02035 (United States)

2006-07-01T23:59:59.000Z

470

Gamma monitor for assay of radioactive solid-waste shipments  

SciTech Connect (OSTI)

A gamma waste monitor has been developed and evaluated at the Savannah River Plant (SRP). The purpose of the monitor is to improve estimates of the radionuclides in solid wastes arriving at the plant's burial ground. This monitor, a computer-based spectrometer, quantitatively measures many radionuclides in SRP waste, including waste in heavily shielded shipping casks. Radionuclides emitting gamma rays of sufficient energy to penetrate the shipping container walls can be measured directly. Other radionuclides that are beta emitters or which emit gamma photons too weak to penetrate the walls of the waste containers can often be estimated by their association with measurable gamma photons. Development of the monitor was initiated to find a more accurate method of estimating the quantities of radioactive materials accumulated in the burial ground and to ensure compliance with burial limits imposed by SRP technical standards. Another benefit from the monitor is that it provides specific radionuclide data which are essential to environmental impact evaluations and decommissioning planning. The gamma waste monitor is described. (WHK)

Crawford, J H

1982-06-01T23:59:59.000Z

471

1984 environmental monitoring report  

SciTech Connect (OSTI)

The environmental monitoring program has been designed to ensure that BNL facilities operate such that the applicable environmental standards and effluent control requirements have been met. A listing, as required by DOE Order 5484.1 of BNL facilities, of environmental agencies and permits is provided in the Environmental Program Information Section 3.0, Table B. Since the aquifer underlying Long Island has been designated a ''sole source'' aquifer, the Environmental Protection Agency (EPA) Drinking Water Standards have been used in the assessment of ground water data. However, the limits prescribed in the regulations are not directly applicable to the monitoring well data since (1) the standards apply to a community water supply system, i.e., one serving more than 25 individuals, and (2) the standards represent an annual average concentration. Since the monitoring wells are not components of the Laboratory's water supply system, the EPA drinking water standards are employed as reference criteria to which the surveillance well data is compared. The standards also serve as guidance levels for any appropriate remedial action. 36 refs., 9 figs., 40 tabs.

Day, L.E.; Miltenberger, R.P.; Naidu, J.R. (eds.)

1985-04-01T23:59:59.000Z

472

Carbon Storage Monitoring, Verification and Accounting Research...  

Energy Savers [EERE]

Monitoring, Verification and Accounting Research Carbon Storage Monitoring, Verification and Accounting Research Reliable and cost-effective monitoring, verification and accounting...

473

Strategic Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Strategic Plans Strategic Plans Strategic Plans The strategic planning process charts the course for the U.S. Department of Energy (DOE) Building America program's efforts to widely deploy new integrated packages of energy-saving measures in new and existing homes. These living documents give an overview of Building America's research approach to evaluate specific building system options for reliability, cost-effectiveness, and marketability. Here you can learn more by reading strategic planning reports for specific research areas. Standing Technical Committees The Building America program actively engages all relevant industry stakeholders in the research planning process, primarily through Standing Technical Committees (STCs). STCs focus on identifying and resolving key

474

Strategic Plan Recreation Management  

E-Print Network [OSTI]

Strategic Plan Recreation Management Department Brigham Young University 2013 #12;Vision We strive in meaningful recreational experiences. Core Values We value the role wholesome recreation plays in the well strive to make meaningful contributions to both recreation related research and practice. Department

Olsen Jr., Dan R.

475

A plan for action  

Science Journals Connector (OSTI)

......to see how the peer-review element to arrive at...Comprehensive Spending Review and try to reverse some...should fol- low up our review, published jointly with...can improve this. I plan to start with a personal...microchannel plate camera, a standard technique in X-ray......

Michael Rowan Robinson

2006-10-01T23:59:59.000Z

476

Plan ?: core or cusp?  

Science Journals Connector (OSTI)

......research-article Article Plan beta: core or cusp? Thomas...Breddels (2013) for a detailed review of the more sophisticated numerical...is available for each star (standard technique). Large data sets...velocity space, we use the standard definition, for the velocity......

Thomas D. Richardson; Douglas Spolyar; Matthew D. Lehnert

2014-01-01T23:59:59.000Z

477

EMERGENCY PLANNING AND PROCEDURES  

E-Print Network [OSTI]

EMERGENCY PLANNING AND PROCEDURES HANDBOOK FOR CWRU EMPLOYEES August 2013 #12;CWRU EMERGENCY innovation, technology, teamwork, public- private co- operation and vigilance. Mission Statement We increase appropriately to any crisis or emergency. This handbook is comprehensive and provides employees with information

Cavusoglu, Cenk

478

EMERGENCY PLANNING AND PROCEDURES  

E-Print Network [OSTI]

EMERGENCY PLANNING AND PROCEDURES HANDBOOK FOR CWRU STUDENTS August 2013 #12;CWRU EMERGENCY innovation, technology, teamwork, public- private co- operation and vigilance. Mission Statement We increase. This handbook is comprehensive and provides studetns with information on how to prepare for and respond

Cavusoglu, Cenk

479

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change as approved Prepared by the California AirBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

480

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change Prepared by the California Air Resources BoardBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

Note: This page contains sample records for the topic "leachate monitoring plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Poster Resources Poster Planning  

E-Print Network [OSTI]

Poster Resources Poster Planning � Discovery Day: Tips for Successful Posters by University of South Carolina Office of Undergraduate Research � Creating Effective Poster Presentations by George Hess, Kathryn Tosney, Leon Liegel http://www.ncsu.edu/project/posters/NewSite/index.html � How to Write

Almor, Amit

482

COMMUNITY WILDFIRE PROTECTION PLANS  

E-Print Network [OSTI]

natural resource knowledge and technical expertise to the planning process, particularly in the areas of GIS and mapping, vegetation management, assessment of values and risks and funding strategies. WHAT of the community, priorities for fuel treatment may include critical watersheds, public water and power facilities

483

Planning for Cities  

Science Journals Connector (OSTI)

... of the techniques-or the disciplines -which should by now inform the work even of pedestrian city planners. The fact that the planning study which has been carried out for ... s ahurch is an obvious need. Some skill has been spent on devices for separating pedestrians and wheeled traffic, chiefly by erecting ...

1968-11-23T23:59:59.000Z

484

ALGAE PLANS BLOOM  

Science Journals Connector (OSTI)

ALGAE PLANS BLOOM ... From PERSONAL CARE TO FISH FOOD, algae firms look for ways to make profits quickly ... ALGAE-GROWING cleantech firms are enjoying a burst of attention, triggered by Solazymes successful initial public offering (IPO) of stock in May. ...

MELODY M. BOMGARDNER

2011-07-18T23:59:59.000Z

485

Planning European space science  

Science Journals Connector (OSTI)

......scientists were aiming for the outer solar sys- tem, for multi-spacecraft...planning process is to identify key technologies to be developed so that identified...are good prospects for better solar-cell technology for planetary missions as far......

Martin Barstow

2004-12-01T23:59:59.000Z

486

Designing a Benchmarking Plan  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Program (WIP) Solution Center document about how state and local governments, Indian tribes, and overseas U.S. territories can design a plan to benchmark the energy consumption in public buildings.

487

2011 Strategic Plan  

Broader source: Energy.gov [DOE]

In May 2011, The Department of Energy today released its 2011 strategic plan, a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions.

488

Plans, Implementation, and Results  

Broader source: Energy.gov [DOE]

The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

489

Corporate Plan Corporate Publications  

E-Print Network [OSTI]

Commission Scotland planned income and expenditure 24 Measuring Performance Developing performance measures providing the difference between income raised and expenditure incurred. We operate in accordance with full-cash charges levied on the capital value tied up in the national forest estate. The 2004 Spending Review

490

Marketing Plan Company Description  

E-Print Network [OSTI]

Marketing Plan Company Description: Consumer company that provides a product to helps boost Marketing Swat Team Project Description and Deliverables: The team will Identify the best online vehicles of promotions from YouTube celebs, co- marketing with related businesses, affiliate marketing, cross marketing

Dahl, David B.

491

Refinery Planning under Uncertainty  

Science Journals Connector (OSTI)

The planning/scheduling of the supply chain under uncertainty is important in light of the ever-changing market conditions. ... Examples of the open-shop mode, such as the news vendor model26 in which the sales of holiday lights disappear after Christmas, for instance, can be found in the real world. ...

Wenkai Li; Chi-Wai Hui; Pu Li; An-Xue Li

2004-09-10T23:59:59.000Z

492

Gonzales Comprehensive Plan  

E-Print Network [OSTI]

Programs (NFIP) Community Rat- ing System (CRS) which reduces the premiums for policy holders within the municipality. In terms of improving the human environment, the plan addresses the impacts of the oil and gas industry as well as improving trails............242 Environment.....245 Future Environment..........283 Policy Table.........288 Appendix....292 Urban Design...

Bright, Elise; Cutaia, Louis; Barrios, Nair; Brinkman, Travis; Caraballo, Stephany; Chen, Long; Coleman, Alex; Crosby, Kevin; Dai, Boya; Espinoza, Carlos; Han, Dondjin; Hansen, Todd; Hyde, Allison; Lazaro, Cristopher; Lin, Rosie; Lopez, Michael; Martin, Michael; Masterson, Jaimie Hicks; Medina, Izel; Peackock, Walter M; Sengupta, Koly; Shelnutt, Andrew; Su, Jin; Tan, Shuman; Tang, Taoi; Tran, Tho

2013-01-01T23:59:59.000Z

493

Student Health Benefit Plan  

E-Print Network [OSTI]

and programs tailored to the needs of students. The SHBP coordinates care with University Health Services (UHS), UMass Amherst's fully accredited health center. UHS provides comprehensive primary care, walk-in care2 2013-2014 Student Health Benefit Plan (SHBP) Designed for the Students of Policy Period: August 1

Massachusetts at Amherst, University of

494

Search Criteria Health Plan  

E-Print Network [OSTI]

Search Criteria Location: Distance: Health Plan: Provider Type: San Diego, CA 92103 Within 10 miles another provider, you are seeking care from that provider, not from Anthem Blue Cross. The provider benefit decisions only and are not the provision of medical care. Anthem Blue Cross is not responsible for

Gleeson, Joseph G.