Powered by Deep Web Technologies
Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Operations Directorate (OPS Directorate)  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

2

Executive Director  

NLE Websites -- All DOE Office Websites (Extended Search)

Executive Director Executive Director Rich Marquez, Executive Director, leads institutional initiatives and provides oversight for the Laboratory's organizations for Ethics and Audits, Prime Contract, Chief Financial Officer, Chief Information Officer, Ombuds, and Communications and Government Affairs. Contact Operator Los Alamos National Laboratory (505) 667-5061 Marquez has received a number of significant awards and recognitions, including the Presidential Rank Award for Meritorious Service. Rich Marquez Executive Director Rich Marquez, Executive Director Richard A. (Rich) Marquez currently serves Los Alamos National Laboratory as executive director reporting to the Laboratory director. Marquez leads institutional initiatives and provides oversight for several Laboratory organizations, including

3

From the Director  

NLE Websites -- All DOE Office Websites (Extended Search)

From the Director From the Director From the Director LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Communications & Government Affairs (505) 667-7000 Our people are highly trained, creative, and innovative. They have one-of-a-kind facilities to accomplish work that very few people in the world can do. We have a vibrant student and postdoctoral program because they are the talent who will solve the problems our predecessors only dreamed of. Director's message Charles McMillan Los Alamos National Laboratory has played a role in some of the most transformational discoveries of the 20th and 21st centuries.

4

Deputy Director  

NLE Websites -- All DOE Office Websites (Extended Search)

Deputy Director Deputy Director Laboratory Deputy Director Elizabeth Sellers has nearly 30 years of management experience leading the integration and improvement of large, complex, and technically diverse environments. Contact Operator Los Alamos National Laboratory (505) 667-5061 Sellers comes to the Laboratory with nearly 30 years of management experience working for the U.S. Department of Energy and private industry, leading the integration and improvement of large, complex, and technically diverse environments. Elizabeth Sellers Laboratory Deputy Director Deputy Director Elizabeth Sellers Elizabeth (Beth) Sellers joined Los Alamos National Laboratory as deputy director on December 5, 2011. Sellers comes to the Laboratory with nearly 30 years of management experience working for the U.S. Department of Energy and private industry,

5

Fermilab | Directorate |  

NLE Websites -- All DOE Office Websites (Extended Search)

thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb thumb photo Nigel Lockyer Laboratory Director Profile photo Victoria A. White Chief Operating Officer Profile photo Stuart Henderson Associate Laboratory Director for Accelerators Profile photo Greg Bock Associate Laboratory Director for Particle Physics Profile photo Randy Ortgiesen Associate Laboratory Director for Operations Support Profile photo Martha Michels Director for ESH&Q and Head of the ESH&Q Section Profile photo Cynthia Conger Chief Financial Officer Profile photo Carl Strawbridge Interim Head, Integrated Planning & Performance Management Profile photo Jim Strait LBNE Project Manager Profile photo Robert Kephart IARC Director/ SRF Program Manager View Profile Profile photo Stephen Geer Head, Program Planning Office

6

Director's Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's Office Director's Office Director's Office Print Roger Falcone Director, Advanced Light Source, Ernest Orlando Lawrence Berkeley National Laboratory and Professor of Physics, University of California, Berkeley. Roger Falcone Web page at the University of California, Berkeley Advanced Light Source Lawrence Berkeley National Laboratory 1 Cyclotron Road, MS 80R0114 Berkeley, CA 94720 USA Tel. (510) 486-6692 Fax (510) 486-4960 Email: This e-mail address is being protected from spambots. You need JavaScript enabled to view it Roger Falcone, University of California, Berkeley physics professor and veteran ALS user, succeeded Janos Kirz as ALS Division Director on September 1, 2006. Dr. Falcone received his undergraduate degree in physics from Princeton University in 1974. He earned an M.S. and Ph.D. in

7

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Integration Directorate Lawrence Livermore National Laboratory John Edwards Associate NIF Director for ICF & HED NIF & Photon Science Directorate Lawrence Livermore National...

8

darpa director appointed  

Science Conference Proceedings (OSTI)

08/12 - DARPA DIRECTOR APPOINTED. Regina E. Dugan has been appointed Director of the Defense Advanced Research Projects Agency (DARPA). It is the ...

9

Independent directors in China.  

E-Print Network (OSTI)

??This thesis examines the development of the independent director system in China. The newly introduced independent director system is viewed as a revolutionary change to… (more)

Ma, Lijun

2009-01-01T23:59:59.000Z

10

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

LLNL DIRECTOR SEARCH Home Lawrence Livermore National Laboratory LLNL DIRECTOR SEARCH Position Description About LLNL News Questions and Answers THE PROCESS Nomination and...

11

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

News "Search process for Lawrence Livermore director, LLNS president gets under way," LLNS news release, Nov. 25, 2013. "Parney Albright steps down as Laboratory director, Bret...

12

Executive Director  

E-Print Network (OSTI)

Dear Dr. Boulton, As you may know, “Workforce ” is the first of the six priorities listed in APHL’s current (2010-2013) and previous (2006-2009) Strategic Plans. A crucial strength of our Association’s ongoing Workforce Development Program is multi-component workforce research. Over the past two years access to support provided by the University of Michigan’s Center of Excellence for Public Health Workforce Studies has greatly accelerated this research program. We are most grateful to the Center and you personally for undertaking the initial characterization of the public health, environmental, and agricultural laboratory (PHEAL) workforce, an undertaking that has provided an excellent assessment and a solid base on which to build future PHEAL workforce research and products needed to expand the PHEAL workforce pipeline. Thank you for forwarding the final draft of the National Laboratory Capacity Assessment. This collaborative initiative has resulted in a summary document rich with information that has provided an exceptional profile of our public health, environmental, and agricultural laboratories. On behalf of the Workforce Development Committee and the APHL Board of Directors, we extend our appreciation for a truly productive and effective collaboration. Lastly, we hope that

Matthew L. Boulton; Scott J. Becker; Jack Deboy Drph

2012-01-01T23:59:59.000Z

13

Statement of Patricia Hoffman, Acting Assistant Director for Electricity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hoffman, Acting Assistant Director for Hoffman, Acting Assistant Director for Electricity Delivery and Energy Reliability, before the Committee on Energy and Natural Resources U.S. Senate, April 22, 2009. Statement of Patricia Hoffman, Acting Assistant Director for Electricity Delivery and Energy Reliability, before the Committee on Energy and Natural Resources U.S. Senate, April 22, 2009. Statement of Patricia Hoffman, Acting Assistant Director for Electricity Delivery and Energy Reliability, before the Committee on Energy and Natural Resources U.S. Senate, April 22, 2009. S. 548, which seeks to amend the Public Utilities Regulatory Policy Act of 1978 to establish a Federal energy efficiency resource standard for retail electricity and natural gas distributors, and for other purposes. Statement of Patricia Hoffman, Acting Assistant Director for Electricity

14

Statement of Patricia Hoffman, Deputy Director R&D, Office of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hoffman, Deputy Director R&D, Office of Electricity Delivery & Energy Reliability, Department of Energy before the Committee on Science and Technology Energy and Environment...

15

Statement of Patricia A. Hoffman, Deputy Director R&D, Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A. Hoffman, Deputy Director R&D, Office of Electricity Delivery & Energy Reliability Department of Energy before the Committee on Science and Technology Energy and Environment...

16

Weights and Measures State Directors  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. State Director's List. Alaska. Dan K. Breeden, Director. AK Division of Measurement Standards/CVE. ...

2010-10-05T23:59:59.000Z

17

Fermilab | Directorate | Director Profiles | Steve Geer  

NLE Websites -- All DOE Office Websites (Extended Search)

Steve Geer Steve Geer Head, Program Planning Office I am currently Head of the Program Planning Office within the Fermilab Directorate, which coordinates the experimental physics program carried out at the Laboratory. The office provides a link between ongoing and planned experiments and the Directorate, by: Acting as liaison between experimenters and laboratory staff regarding beam conditions during accelerator operation. Establishing priorities between accelerator studies and experiments and among experiments, in consultation with the Director, and resolving conflicting requests from experiments. Coordinating Division and Section reviews of draft Memoranda of Understanding for approved experiments. Coordinating updates to the "Procedures for Researchers" which

18

Statement of Patricia A. Hoffman, Deputy Director of Research and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A. Hoffman, Deputy Director of Research and A. Hoffman, Deputy Director of Research and Development and Acting Chief Operating Officer, Office of Electricity Delivery & Energy Reliability, Department of Energy before the Committee on Energy and Natural Resources United States Statement of Patricia A. Hoffman, Deputy Director of Research and Development and Acting Chief Operating Officer, Office of Electricity Delivery & Energy Reliability, Department of Energy before the Committee on Energy and Natural Resources United States Statement of Patricia A. Hoffman, Deputy Director of R&D and Acting Chief Operating Officer. Office of Electricity Delivery & Energy Reliability, Department of Energy. Committee on Energy and Natural Resources, United States Senate, November 6, 2007 on the nation's domestic energy sector

19

Nuclear & Particle Physics Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

at RHIC or the AGS should be submitted to the Associate Laboratory Director for Nuclear and Particle Physics, presently Steve Vigdor, Bldg. 510F, Brookhaven National...

20

Nuclear & Particle Physics Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

NSAC Meeting, Bethesda, Maryland: 3-5 April 2005 US Nuclear Science web site (link to meeting) Brookhaven Presentations: Director's Remarks: Praveen Chaudhari Overview: Sam Aronson...

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Nuclear & Particle Physics Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear & Particle Physics Directorate Nuclear and Particle Physics (NPP) at BNL comprises the Collider-Accelerator Department (including the NASA Space Radiation Laboratory,...

22

c. content director  

Science Conference Proceedings (OSTI)

Seeking approval and/or informing the Board of content development and ... Present oral and written reports to the Board of Directors on the status of those.

23

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Search Committee Search Committee for the selection of a director for Lawrence Livermore National Laboratory November 2013 * Additional members are under consideration. Norman...

24

f. program director  

Science Conference Proceedings (OSTI)

Committee, one year in advance of assuming office. ... The Program Director holds office for three ... Has successful experience in managing a budget.

25

Electricity Reliability  

NLE Websites -- All DOE Office Websites (Extended Search)

lines and bar graph Electricity Reliability The Consortium for Electric Reliability Technology Solutions (CERTS) conducts research, develops, and disseminates new methods, tools,...

26

Fermilab | Directorate | Director Profiles | Nigel Lockyer  

NLE Websites -- All DOE Office Websites (Extended Search)

Nigel Lockyer Nigel Lockyer Laboratory Director Nigel Lockyer began his tenure as director of Fermi National Accelerator Laboratory, AmericaÂ’s premier laboratory for particle physics research, on September 3, 2013. An experimental particle physicist, Lockyer was most recently director of TRIUMF, CanadaÂ’s national laboratory for particle and nuclear physics. He was also a professor of physics and astronomy at the University of British Columbia. Under his leadership, TRIUMF formulated a vision for ascending the world stage in nuclear physics using rare-isotope beams to address some of the most fundamental questions in science. Lockyer expanded the laboratoryÂ’s operations by 25 percent, earning a reputation as a national leader and team-builder. He also developed a strong working partnership among

27

Fermilab | Directorate | Director Profiles | Martha Michels  

NLE Websites -- All DOE Office Websites (Extended Search)

Martha Michels Martha Michels Director for ESH&Q and Head of the ESH&Q Section As the Director for ESH&Q and Head of the ESH&Q Section, Michels is responsible for the management and direction of Fermi National Accelerator LaboratoryÂ’s environment, safety and health programs. She ensures that ESH&Q is integrated into all activities within the line organizations in an effective and efficient manner. Michels assists the Directorate in assessing the resource needs and priorities of the Laboratory concerning ESH&Q. She represents the lab on ESH&Q issues with the Department of Energy, government and non-government agencies and other national laboratories. Michels owns the ESH&Q Management System, which establishes and maintains ESH&Q policies and procedures. She assesses line organizations for

28

Director`s series on proliferation  

SciTech Connect

The Director`s Series on Proliferation is an occasional publication of essays on the topics of nuclear, chemical, biological, and missile proliferation. The seven papers presented in this issue cover the following topics: Should the Treaty on the Nonproliferation of Nuclear Weapons (NPT) be amended?; NPT extension - Legal and procedural issues; An Indonesian view of NPT review conference issues; The treaty of Tlatelolco and the NPT - Tools for peace and development; Perspectives on cut-off, weapons dismantlement, and security assurances; Belarus and NPT challenges; A perspective on the chemical weapons convention - Lessons learned from the preparatory commission.

Bailey, K.C.; Price, M.E. [eds.

1994-12-27T23:59:59.000Z

29

MEMORANDUM FOR FEDERAL PROCUREMENT DIRECTORS FROM: DIRECTOR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2009 2009 MEMORANDUM FOR FEDERAL PROCUREMENT DIRECTORS FROM: DIRECTOR OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT SUBJECT: Changes to the Balanced Scorecard Program The Balanced Scorecard (BSC) performance management methodology has played a significant role in helping the Office of Procurement and Assistance Management assess the performance of the Department's Federal procurement offices and the purchasing organizations of its major site and facility contractors. This methodology provides the conceptual framework for creating, communicating, collecting and arraying performance objectives, measures, targets, and initiatives. Over the years, we have used the BSC assessment results to identify and monitor desired organizational changes, to expose problem areas needing management attention, to

30

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: April 14, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: DOE 2011 Continuity of Operations (COOP) Awareness Briefing Available to Contractors SUMMARY: For each contract requiring or involving responsibility for work or operations at DOE/NNSA sites or facilities that support or perform essential functions/activities that directly support National Essential Functions (NEF), Mission Essential Functions (MEF), Primary Mission Essential Functions (PMEF), or Essential Supporting Activities (ESA) the Contractor Requirements Document (CRD) DOE Order 150.1, Continuity Programs, sets forth the contractor responsibility for a Continuity of

31

TO: Procurement Directors FROM: Director, Contracts and Financial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directors FROM: Director, Contracts and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: DOE O 580.1A...

32

2013 Director's New Year Address  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's New Year Address 2013 Director's New Year Address Print Looking Forward and Celebrating 20 Years in 2013 falocne We recently sat down with ALS Director Roger Falcone to...

33

Biosciences Division Seeking New Director  

NLE Websites -- All DOE Office Websites (Extended Search)

Director Search DOE Logo Search BIO ... Search Argonne Home > BIO home > Biosciences Division Seeking New Director BIO Home Page About BIO News Releases Research Publications...

34

Directorate Organization | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

ORNL Neutron Sciences Directorate The Neutron Sciences Directorate (NScD) manages and operates the Spallation Neutron Source and the High Flux Isotope Reactor, two of the world's...

35

Fermilab | Fermilab Director Search | Home  

NLE Websites -- All DOE Office Websites (Extended Search)

Feature photo Fermilab Director Search In October 2012, the Board of Directors of the Fermi Research Alliance, LLC appointed a committee to conduct an international search for the...

36

PNNL: About PNNL - Director's Message  

NLE Websites -- All DOE Office Websites (Extended Search)

Director Michael Kluse, Laboratory Director At Pacific Northwest National Laboratory (PNNL), we are transforming the world through courageous scientific discovery and innovation....

37

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 DATE: May 18, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 8.4 - Federal Supply Schedules and Chapter 16.5 - Multiple-award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders SUMMARY: Acquisition Guide Chapters 8.4 - Federal Supply Schedules and 16.5 - Multiple- Award Contracts and Governmentwide Acquisition Contracts Including Delivery Orders and Task Orders replace Chapter 38.1 Strategic Acquisition Transactions. The new chapters include revisions from Federal Acquisition Circular (FAC) 2005-50 to Federal Acquisition Regulation (FAR) Subparts 8.4 and 16.5.

38

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

83 83 DATE: June 15, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 8.4 - Federal Supply Schedules SUMMARY: Acquisition Guide Chapters 8.4 - Federal Supply Schedules is revised to provide guidance on how to issue a request for quotation and receive quotes when using e-Buy. STRIPES is DOE's repository for all acquisition and financial assistance actions. As such, all requests for quotation (RFQ) should be issued and quotes received through STRIPES/FedConnect and not e-Buy. In lieu of uploading the RFQ to e-Buy, contracting officers will post a file that instructs FSS holders to go to www.FedConnect.net to locate the

39

Fermilab | Directorate | Director Profiles | Robert Kephart  

NLE Websites -- All DOE Office Websites (Extended Search)

Robert Kephart Robert Kephart IARC Director/SRF Program Manager As the Director of the Illinois Accelerator Research Center (IARC) at Fermilab my goal is to bridge the gap between breakthroughs in accelerator science and technology and solutions for society. IARC will allow our university and laboratory partners to leverage Fermilab's extensive accelerator infrastructure and expertise, resulting in new accelerator-based products and businesses in the United States. I proposed and lead a construction project funded by the U.S. Department of Energy and the State of Illinois to build a new complex valued at $70 million to support the IARC mission on the Fermilab campus. I manage the superconducting radio frequency (SRF) technology program, a $30 million-a-year research and development effort that supports a proposed new

40

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

40 40 DATE: February 9, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Issue a New Department of Energy Acquisition Guide Chapter 6.5 Competition Advocate Responsibilities and Revise Pages in Chapters 6.1 and 7.1. SUMMARY: Attached is a new chapter of the DOE Acquisition Guide entitled Competition Advocate Responsibilities. It provides a comprehensive overview of the topic. The new chapter necessitates page changes to Chapters 6.1 and 7.1. Chapter 6.1 has been revised to advise the contracting officer that for actions less than $650,000, the contracting officer is highly encouraged to have the Contracting Activity Competition Advocate review

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-56 POLICY FLASH 2011-56 DATE: March 16, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Publication of Federal Acquisition Circular 2005-50 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular 2005-50 which makes miscellaneous changes to the Federal Acquisition Regulation. We are reviewing Item II for possible changes we may need to make in DOE Acquisition Guide Chapter 38. This Flash and its attachment will be available online within a day, at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Federal Acquisition Circulars may be found, in both their Federal Register notice form

42

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: April 7, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Publication of Federal Acquisition Circular 2005-51 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular 2005-51 which makes two changes to the Federal Acquisition Regulation involving the small business program and a modification of Standard Form 26. This Flash and its attachment will be available online within a day, at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Federal Acquisition Circulars may be found, in both their Federal Register notice form and in loose leaf form at: https://www.acquisition.gov/far/.

43

NERC 101  

U.S. Energy Information Administration (EIA) Indexed Site

Electric Power Infrastructure: Electric Power Infrastructure: Electric Power Infrastructure: Status and Challenges for the Future Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis Owners, Operators, and Users  2005 Energy Policy Act: * All users, owners, and operators of the bulk-power system shall comply with reliability standards  FERC Rule * All entities subject to the Commission's reliability jurisdiction... (users, owners, and operators of the bulk-power system) shall comply with applicable Reliability Standards ... U.S. Energy Policy Act of 2005 Reliability Legislation  One industry self-regulatory ERO  FERC oversight * Delegates authority to set and enforce mandatory standards to ERO * ERO may delegate authority to regional entities

44

LLNL Director Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Search Process As agreed among the LLNS partners, the University of California is responsible for leading the search for the next LLNL Director. UC-appointed Chairman of the LLNS...

45

Thomas Reddinger Director, Steam  

E-Print Network (OSTI)

(Distribution) Deborah Moorhead Office Coordinator III Martin Bower Steam Plant Operator Richard Redfield SteamThomas Reddinger Director, Steam Operations Steven Richards Assistant Manager of Maintenance Plant Operator Bohdan Sawa Steam Plant Operator Robert Tedesco Steam Plant Operator James Bradley

Raina, Ramesh

46

North American Electric Reliability Corporation (NERC): Reliability...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid. NERC develops and enforces Reliability Standards; assesses...

47

Principal Associate Director - Global Security  

NLE Websites -- All DOE Office Websites (Extended Search)

Principal Associate Director - Global Security Principal Associate Director - Global Security As Principal Associate Director for Global Security, Wallace leads Laboratory programs with special focus on developing and applying the scientific and engineering capabilities to address complex national and global security threats. Contact Operator Los Alamos National Laboratory (505 667-5061 Wallace's expertise is forensic seismology, a highly specialized discipline focusing on detection and quantification of nuclear tests. Terry C. Wallace, Jr. Principal Associate Director for Global Security Terry C. Wallace, Jr., Principal Associate Director for Global Security As Principal Associate Director for Global Security, Wallace leads Laboratory programs with a focus on applying scientific and engineering capabilities

48

Electricity Reliability  

E-Print Network (OSTI)

and reliability of the energy infrastructure, and facilitating recovery from disruptions to energy supply. MajorElectricity Delivery and Energy Reliability High Temperature Superconductivity (HTS) Visualization on the nation's energy delivery system Superconductors are important to meeting the nation's energy needs

49

Environment, Safety & Health Directorate Assistant Laboratory Director (ALD)  

E-Print Network (OSTI)

Environment, Safety & Health Directorate Assistant Laboratory Director (ALD) Environmental Division (4) Matrixed from Safety & Health Services Division (5) Matrixed from Procurement & Property Procurement Support (5) D&D Manager Work Control Manager Safety & Health Manager (4) Facility Configuration

Homes, Christopher C.

50

ORNL Neutron Sciences Directorate Executive Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Neutron Sciences Directorate Executive Office Kelly Beierschmitt ORNL Associate Laboratory Director for Neutron Sciences Kelly Beierschmitt. The Neutron Sciences Directorate (NScD)...

51

About Berkeley Lab: Laboratory Director, Associate Laboratory...  

NLE Websites -- All DOE Office Websites (Extended Search)

2009, replacing former laboratory Director Steve Chu, who was sworn in as U.S. Energy Secretary. Before becoming interim director, Alivisatos was the deputy director of Berkeley...

52

Fermilab | Directorate | Director Profiles | Jim Strait  

NLE Websites -- All DOE Office Websites (Extended Search)

Jim Strait Jim Strait LBNE Project Manager As the LBNE Project Manager, I have the overall responsibility and authority to execute the LBNE Project, and to meet the approved scientific, cost and schedule goals of the project. In this role, I lead and direct the development of the technical, cost and schedule baseline for the project and the construction of the project defined by the approved baseline. I also prepare for and establish management systems, consistent with DOE and Fermilab Project Management orders and structures, to ensure that the project is successfully executed. I also represent the Project in interactions with the LBNE collaboration, Fermilab management, management of other participating national laboratories, and the Department of Energy. As the LBNE project manager, I report to the laboratory director. I head

53

Fermilab | Directorate | Director Profiles | Carl Strawbridge  

NLE Websites -- All DOE Office Websites (Extended Search)

Carl Strawbridge Carl Strawbridge Interim Head, Integrated Planning & Performance Management I head the Office of Integrated Planning & Performance Management (IPPM), which supports the sectors and the Directorate. The office of IPPM provides systems and management processes for institutional planning and performance assessment and evaluation, as well as leading multi-year, forward-looking planning and integration of institutional plans, programs, projects, operations and budgets. In addition the office of IPPM develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program oversight, enterprise risk management and performance planning and oversight. I received my B.S. degree from the US Naval Academy and Masters Degrees

54

Thomas Reddinger Director, Steam  

E-Print Network (OSTI)

Supervisor (Distribution) Deborah Moorhead Office Coordinator III Martin Bower Steam Plant Operator RichardThomas Reddinger Director, Steam Operations Steven Richards Assistant Manager of Maintenance Redfield Steam Plant Operator SU Steam Station/Chilled Water Plant Bohdan Sawa Steam Plant Operator Robert

McConnell, Terry

55

Global and Regional Solutions Directorate  

E-Print Network (OSTI)

at Pacific NW National Lab (PNNL) ­ Founding Director Joint Global Change Research Institute (PNNL/UMd) ­ ALD (PNNL) ­ Environmental and Health Sciences Directorate; Emerging Technologies ­ Chief Scientist ­ Atmospheric Radiation Measurement Program ­ Director ­ PNNL Global Studies Program ­ Other (PNNL): Center

Homes, Christopher C.

56

Dr. Anthony (Tony) Peurrung Associate Laboratory Director  

E-Print Network (OSTI)

, the Intelligence Community and the National nuclear Security Administration. Dr. Peurrung has contributedDr. Anthony (Tony) Peurrung Associate Laboratory Director National Security Directorate In his current position as Associate Laboratory Director of the National Security Directorate, Dr. Tony Peurrung

57

EIA - Energy Conferences & Presentations.  

U.S. Energy Information Administration (EIA) Indexed Site

4 4 EIA Conference 2009 Session 4: Electric Power Infrastructure: Status and Challenges for the Future Listen to Session: Audio of Session 1 from 2009 EIA Conference Full Session Transcript PDF Icon pdf Moderator: Scott Sitzer (EIA) Speakers: P. Kumar Agarwal (Federal Energy Regulatory Commission) Timothy J. Brennan (University of Maryland) Mark G. Lauby (North American Electric Reliability Corporation) Note: Concurrent sessions used a variety of presentation and round table discussion formats. All available presentations have been posted. Moderator and Speaker Bios and Presentations Scott Sitzer, Director of the Office of Coal, Nuclear, Electric and Alternate Fuels Scott Sitzer is Director of the Office of Coal, Nuclear, Electric and Alternate Fuels of the Energy Information Administration (EIA). He has been

58

Beam director design report  

Science Conference Proceedings (OSTI)

A design and fabrication effort for a beam director is documented. The conceptual design provides for the beam to pass first through a bending and focusing system (or ''achromat''), through a second achromat, through an air-to-vacuum interface (the ''beam window''), and finally through the vernier steering system. Following an initial concept study for a beam director, a prototype permanent magnet 30/sup 0/ beam-bending achromat and prototype vernier steering magnet were designed and built. In volume II, copies are included of the funding instruments, requests for quotations, purchase orders, a complete set of as-built drawings, magnetic measurement reports, the concept design report, and the final report on the design and fabrication project. (LEW)

Younger, F.C.

1986-08-01T23:59:59.000Z

59

Director testifies before Senate subcommittee  

NLE Websites -- All DOE Office Websites (Extended Search)

Director testifies before Senate subcommittee Director testifies before Senate subcommittee Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Director testifies before Senate subcommittee Future Laboratory budgets under consideration. June 1, 2013 Director Charlie McMillan during his remarks Director Charlie McMillan during his remarks Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Lab Director Charlie McMillan and the directors of Sandia and Lawrence Livermore national laboratories recently spoke before the U.S. Senate Subcommittee on Strategic Forces, Committee on Armed Services. The purpose of the hearing was to to receive testimony on NNSA management of its national security laboratories and to review the budget request for Fiscal

60

NERSC Director Kathy Yelick named Associate Lab Director for...  

NLE Websites -- All DOE Office Websites (Extended Search)

for Computing Sciences. Yelick has been the director of the National Energy Research Scientific Computing Center (NERSC) since 2008, a position she will continue to hold. "I am...

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Light Sources Directorate Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Light Sources Directorate Light Sources Directorate Strategic Plan December 2009 Light Sources Directorate Strategic Plan December 2009 ii | Vision and Mission Light Sources Directorate Strategic Plan The VISION of the Light Sources Directorate is: to be a provider of choice for world-class photon science and facilities that deliver outstanding scientific productivity and impact, and to be recognized as a leader in developing innovative techniques and ap- plications of photon science Our MISSION is defined by the set of activities that are required to realize this vision: to advance scientific knowledge and to solve critical problems through the design, construction, operation, and use of premier photon science facilities | Table of Contents Light Sources Directorate Strategic Plan

62

Principal Associate Director - Capital Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Principal Associate Director - Capital Projects Principal Associate Director - Capital Projects As Principal Associate Director for Capital Projects, Henry is responsible for institutional large-project construction and management and environmental cleanup functions. Contact Operator Los Alamos National Laboratory (505) 667-5061 Before coming to the Lab in 2011, he served as manager of the $3.2 billion project to safely destroy the stockpile of deadly mustard chemical agent at the Pueblo Chemical Depot in Colorado. Paul Henry Principal Associate Director for Capital Projects Paul Henry, Principal Associate Director for Capital Projects As Principal Associate Director for Capital Projects, Henry is responsible for institutional large-project construction and management and environmental cleanup functions.

63

Achieving Energy Reliability TOGETHER. Achieving Energy Reliability...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Achieving Energy Reliability TOGETHER. Achieving Energy Reliability TOGETHER. 2010 STRATEGIC PLAN June 2010 TABLE OF CONTENTS OE's Declaration . . . . . . . . . . . . . . . . . . ....

64

Principal Associate Director - Weapons Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

Weapons Programs As Principal Associate Director for the Weapons Program, Knapp leads the programs to assure the safety, security, and effectiveness of the systems in the nation's...

65

W. E. Mott, Director,  

Office of Legacy Management (LM)

Department of Energy Department of Energy F&k i?z;;Operations dak Ridge, Tennessee 37830 W. E. Mott, Director, It is concluded that the potential for uranium contamination, even during the contract period, was small and that subsequent disposition of laboratory, furnishings and equipment further reduced that potential to the point where, it is felt, the need for further onsite investigation is not indicated. Hence, it is recommended that the reassessment of the site at 818 Perry Street, Richmond, Virginia, be terminated with this report. ti?LbL~ W. T. Thornton Environmental Protection Branch 0SE:WTT Safety & Environmental Control Division c d v76-2 Bo 7W -rwG 1 - ---_ -- -- Er-fl ,T - .,- L 4-------c 1 / 7, pi ' I ./7 * ---:;N-... __ P 2 (' - , . . dq/ ' j'

66

Procurement Directors DATE: TO:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

18 18 1 POLICY FLASH 2008-1 8 January 29,2008 Procurement Directors DATE: TO: FROM: Office of Procurement and Assistance Policy, MA-6 1 Ofice of Procurement and Assistance Management SUBJECT: Federal Acquisition Circular 2008-18 SUMMARY: The General Services Administration has issued Federal Acquisition Circular 2005-23. This Circular can be found at page 732 14 of the December 26,2007 Federal Register. The Circular covers three subjects for which interim or final rules have been issued amending the Federal Acquisition Regulation. A description of each revision is contained in the attachment. None of these necessitates a revision of the DEAR. One of the revisions dealing with the Electronic Product Environmental Assessment Tool (EPEAT) replaces

67

Viewgraph from the Director  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Viewgraph from the Director Art Rosenfeld standing in front of a black board. Few benefits are provided by electric power plants, coal mines, oil pipelines, and other energy supply systems aside from the energy they produce. Technologies to improve energy end-use efficiency, however, offer numerous non-energy benefits. One class of such benefits accrues at the national level-improved competitiveness, energy security, net job creation, environmental protection-while another relates to consumer decision-making. From a consumer perspective, it is often the non-energy benefits that motivate (or can be used to promote) decisions to adopt energy-efficient technologies. A striking example is the rapid penetration of microwave ovens into the housing stock. While energy savings from microwave ovens can

68

Federal Project Directors in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

appropriate front-end plan- appropriate front-end plan- ning process would help DOE to identify the mission need for the project and aid in iden- tification and evaluation of alternative approaches and assessment of the cost and risks of each. This should lead to a well-defined set of re- quirements and scope of work that form the basis for effec- tive design. Front-end plan- ning in the DOE project man- agement system includes plan- ning procedures from project conception through approval of the performance baseline (CD-2). The Office of Engineering and Construction Management has developed two guides to assist Federal Project Directors in measuring progress toward achieving technology and pro- ject definition maturity during front-end planning prior to CD -2. DOE G 413.3-4, Technol-

69

TO: FROM: Procurement Directors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2010-28 POLICY FLASH 2010-28 '/ 7- DATE: March 4,20 10 TO: FROM: Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Temporary Waiver of Mandatory Use of the Strategic Integrated Procurement Enterprise System (STRIPES) for Certain Purchase Card Transactions SUMMARY: Several issues have been identified relating to the use of STRIPES for the processing of transactions at or below the micro-purchase threshold of $3,000 using the Government-wide purchase card. These issues relate strictly to the efficient processing of such transactions and not to the ability of STRIPES to properly and accurately process these actions. Based on the above, the mandatory use of STRIPES for individual purchase card transactions

70

TO: FROM: Procurement Directors  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

b b POLICY FLASH 2010-42 . DATE: April 8,20 10 TO: FROM: Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Use of New Strategically Sourced Blanket Purchase Agreement for Domestic Delivery Services with United Parcel Service SUMMARY: The Department of Energy (DOE) is participating as an authorized user of the second generation General Services Administration (GSA) Blanket Purchase Agreement (BPA) GS-33F-BQV08 for Express and Ground Domestic Delivery Services (DDS2) in the continental United States, Alaska, Hawaii, and Puerto Rico. DDS2 is a full service Federal Strategic Sourcing Initiative (FSSI) solution providing agencies with a range of delivery options as well as

71

North American Electric Reliability Corporation (NERC): Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Corporation (NERC): Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid. NERC develops and enforces Reliability Standards; assesses adequacy annually via a ten-year forcast and winter and summer forecasts; monitors the bulk power systems; and educates, trains, and certifies industry personnel. North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to

72

TMS Board of Directors: James W. Sears  

Science Conference Proceedings (OSTI)

TMS Director/Chair, Materials Processing & Manufacturing Division. James W. Sears is director of Additive Manufacturing at the South Dakota School of Mines ...

73

Organization: Principal Associate Directorate for Global Security...  

NLE Websites -- All DOE Office Websites (Extended Search)

Principal Associate Director Terry Wallace Associate Director Threat Identification and Response Scott Gibbs Phone: 1-505-667-1663 Fax: 1-505-665-8974 Organization PADGS...

74

Fermilab | Fermilab Director Search | Process and Charge  

NLE Websites -- All DOE Office Websites (Extended Search)

Process and Charge Charge to the Director Search Committee Fermi National Accelerator Laboratory The Fermi Research Alliance, LLC Board of Directors charges the Committee to engage...

75

Director's colloquium March 18 large hadron collider  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's colloquium large hadron collider Director's colloquium March 18 large hadron collider Lyndon Evans of CERN will talk about the most complex scientific instrument ever...

76

ESH&Q Directorate Home Page  

NLE Websites -- All DOE Office Websites (Extended Search)

Training & Qualifications Other BNL Site Index Can't View PDFs? Environment, Safety and Health Directorate George A. Goode Assistant Laboratory Director ES&H Organizational Chart...

77

TMS Board of Directors: James W. Sears  

Science Conference Proceedings (OSTI)

James W. Sears is director of Additive Manufacturing at the South Dakota School of Mines & Technology and executive director of the Quad Cities Manufacturing ...

78

Achieving Energy Reliability TOGETHER. Achieving Energy Reliability...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Achieving Energy Reliability TOGETHER. Achieving Energy Reliability TOGETHER. 2010 STRATEGIC PLAN June 2010 This plan reflects OE's ongoing development of a strategy to achieve the...

79

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

NLE Websites -- All DOE Office Websites (Extended Search)

Publications Publications Screenshot of the cover of an NREL report, titled Gearbox Reliability Collaborative Project Report: Findings from Phase 1 and Phase 2 testing. The NREL wind research program's Gearbox Reliability Collaborative publishes reports and presentations of its activities. General Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test Plan 2013 DOE/NREL Gearbox Reliability Collaborative: All Members Meeting Agenda 2012 Gearbox Reliability Collaborative Phase 1 and 2: Testing and Modeling Results 2012 Gearbox Reliability Collaborative Update: A Brief (Presentation) Jan 2012 Gearbox Reliability Collaborative Update (Presentation) April 2012 NREL Collaborates to Improve Wind Turbine Technology (Fact Sheet) 2012 Gearbox Reliability Collaborative - Phase 1 and 2 Overview

80

Fermilab | Directorate | Program Planning Office  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Planning Office Program Planning Office Steve Geer, Head The Program Planning Office within the Fermilab Directorate coordinates the experimental physics program carried out at the Laboratory. The office provides a link between ongoing and planned experiments and the Directorate, by: Acting as liaison between experimenters and laboratory staff regarding beam conditions during accelerator operation. Establishing priorities between accelerator studies and experiments and among experiments, in consultation with the Director, and resolving conflicting requests from experiments. Coordinating Division and Section reviews of draft Memoranda of Understanding for approved experiments. Coordinating updates to the "Procedures for Researchers" which provides a guide for researchers using Fermilab facilities.

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Directorate Contacts | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Contacts Directorate E-mail Phone Fax Business Services branhams@ornl.gov 865.241.7614 865.241.7595 Communications keimdm@ornl.gov 865.576.9122 865.574.0595 Computing...

82

Director's commitment to diversity recognized  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's commitment to diversity recognized Director's commitment to diversity recognized Director's commitment to diversity recognized Profiles in Diversity Journal is recognizing Director Michael Anastasio for his commitment to workplace diversity. March 11, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Contact Communications Office

83

Weights and Measures State Directors AC  

Science Conference Proceedings (OSTI)

State Directors AC. Alaska. Mailing Address, Contact Information. Alaska Division of Measurement Standards/CVE 11900 ...

2013-05-03T23:59:59.000Z

84

Docket No. EO-05-01: Letter from Kevin Kolevar, Director Office of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

from Kevin Kolevar, Director Office of from Kevin Kolevar, Director Office of Electricity Delivery and Energy Reliability, to Mr. Robert Driscoll, CEO Mirant Mid-Atlantic, LLC Docket No. EO-05-01: Letter from Kevin Kolevar, Director Office of Electricity Delivery and Energy Reliability, to Mr. Robert Driscoll, CEO Mirant Mid-Atlantic, LLC Docket No. EO-05-01: On December 20, 2005, the Secretary of Energy issued DOE Order No. 202-05-3, pursuant to section 202(c) of the Federal Power Act, 16 U.S.c. § 824a(c), ordering the operation of the Potomac River Generating Station (the Plant) owned by Mirant Potomac River, LLC (Mirant). DOE has determined that the operation of the Plant under Option A pursuant to DOE's January 4, 2006 instructions does not provide an adequate level of electric reliability to the Central D.C. area under current circumstances. Operation

85

TO: Procurement Directors/Contracting Officers FROM: Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: October 30 , 2013 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Continuing Appropriations Act, 2014 -- Congressional Notification of Pending Contract or Financial Assistance Actions in excess of $1 Million under the Continuing Resolution SUMMARY: Section 101(a)(6) of the Continuing Appropriations Resolution Act, 2014, Pub. L No. 113-46, makes appropriations available through January 15, 2014 for continuing projects or activities that were conducted under Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No.113-6, under the same authority and conditions. Therefore, the Section 311

86

TO: Procurement Directors/Contracting Officers FROM: Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 DATE: January15, 2014 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Determination of Benchmark Compensation Amount for Certain Executives and Employees (Update) SUMMARY: The purpose of this Flash is to update Policy Flash 2014-12 issued on December 28, 2013 to reflect the current Executive Compensation Cap pursuant to the Bipartisan Budget Act of 2013 (H.J.Res. 59) which was signed into law on December 26, 2013. The provision in Section 702 - "Limitation on allowable government contractor compensation costs"- limits how much a contractor could charge the federal government for an

87

Tom Rogers Director, Industrial Partnerships  

NLE Websites -- All DOE Office Websites (Extended Search)

Tom Rogers, rogerstc@ornl.gov 865-241-2149 Tom Rogers, rogerstc@ornl.gov 865-241-2149 Tom Rogers Director, Industrial Partnerships and Economic Development Tom Rogers was named Director of Industrial Partnerships and Economic Development at the Oak Ridge National Laboratory in June, 2008. His responsibilities include directing engagements with industrial partners, forging new ORNL entrepreneurial support efforts, and leading a number of strategic initiatives such as the Carbon Fiber Composites Cluster and development of the Oak Ridge Science and Technology Park. Prior to joining ORNL, Tom was the founding President and CEO of Technology 2020, a national award-winning public-private partnership focused on a building a robust regional entrepreneurial support system. Tom has also served as the Executive Director of the Tennessee Technology

88

Los Alamos Lab: NSO: Hot Spot: Director's Papers, Reviews  

NLE Websites -- All DOE Office Websites (Extended Search)

National Security Office. The Hot Spot page lists recently published Director's papers, book reviews, etc. Director's Paper: Safeguards at 40, LANL Director Michael Anastasio (pdf)...

89

Electricity & Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENERGY RELIABILITY Human Capital Management Strategic Plan FY2007 Office of Electricity Delivery and Energy Reliability Human Capital Management Strategic Plan September 2006...

90

Office of the Director -- Chief of Staff  

Science Conference Proceedings (OSTI)

... Director in administering the policies, programs, and ... and ramifications of policy and program ... INTERNATIONAL AND ACADEMIC AFFAIRS OFFICE ...

2012-02-08T23:59:59.000Z

91

Weights and Measures State Directors M  

Science Conference Proceedings (OSTI)

State Directors M. Maine. Mailing Address, Contact Information. Maine Quality Assurance & Regulations 28 State House Station Augusta, ME 04333. ...

2013-08-26T23:59:59.000Z

92

Weights and Measures State Directors W - Z  

Science Conference Proceedings (OSTI)

State Directors W - Z. Washington. Mailing Address, Contact Information. WA Department of Agriculture PO Box 42560 Olympia, WA 98504. ...

2012-11-29T23:59:59.000Z

93

Naval Nuclear Propulsion Program Directorate, Washington ...  

Science Conference Proceedings (OSTI)

Naval Nuclear Propulsion Program Directorate, Washington, DC. NVLAP Lab Code: 100565-0. Address and Contact Information: ...

2013-08-23T23:59:59.000Z

94

Naval Nuclear Propulsion Program Directorate, Washington ...  

Science Conference Proceedings (OSTI)

Naval Nuclear Propulsion Program Directorate, Washington, DC. NVLAP Lab Code: 100565-2. Address and Contact Information: Point Loma, Bldg. ...

2013-08-23T23:59:59.000Z

95

Lab Director's Diversity & Inclusion Message | Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Diversity Message from the Lab Director Diversity & Inclusion Advisory Council Workforce Pipeline Mentoring Leadership Development Policies & Practices Business Diversity Outreach...

96

Weights and Measures State Directors IL  

Science Conference Proceedings (OSTI)

State Directors IL. Idaho. Mailing Address, Contact Information. ISDA Bureau of Weights & Measures PO Box 790 Boise, ID 83701. ...

2013-05-07T23:59:59.000Z

97

Naval Nuclear Propulsion Program Directorate, Washington ...  

Science Conference Proceedings (OSTI)

Naval Nuclear Propulsion Program Directorate, Washington, DC. NVLAP Lab Code: 100565-10. Address and Contact Information: Naval Reactors ...

2013-07-26T23:59:59.000Z

98

Vice President for Student Affairs Executive Director, CSU Health Network  

E-Print Network (OSTI)

Director of Medical Services Pharmacy Dental Services Laboratory Services Women's Clinic Assistant Director Behavioral Health Director of Specialty Counseling Services Drugs, Alcohol, & You (DAY) Programs i Behavioral Health Director of Business Services Accounting Student Health Insurance Human Resources Manager

99

Integrity, Reliability and Security: The Role of Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

F. Lawson F. Lawson Director, Strategic Center for Natural Gas & Oil National Energy Technology Laboratory General session Natural Gas Technologies Conference 2005 Cosponsors: NETL/Gas Technology Institute Orlando, Florida January 31, 2005 Integrity, Reliability and Security: The Role of Technology Introduction Integrity, reliability, and security encompass all the attributes we want-indeed, need-from our natural gas industry. We need integrity in physical transportation and storage systems, reliability in operating systems, and security in supplies and delivery systems. This conference is the most comprehensive forum for addressing new and evolving technologies impacting all these needs. The conference scope runs the gamut: from finding and producing to storing,

100

Photon Sciences Directorate | 2010 Annual Report | DISCOVERY at Light Speed  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Division Delivers Reliable NSLS Beams, Key NSLS-II Components Accelerator Division Delivers Reliable NSLS Beams, Key NSLS-II Components Ferdinand Willeke "We had 14 goals for the year and checked off 11, with 'in progress' noted on the balance. This achievement is a testament to the talent and hard work of the Accelerator Division staff, our vendors, and our supporters at Brookhaven and elsewhere." - Ferdinand Willeke Director, Accelerator Division Photon Sciences' Accelerator Division had a full workload in 2010. While it was generally business as usual at NSLS, maintaining an older synchrotron at a high performance level is not easy. The NSLS-II Project placed increasing demands on the division, with 2010 seeing great growth in construction and design, and preparations ongoing for the eventual transition from NSLS to the new facility.

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Director  

E-Print Network (OSTI)

All data are provisional. The HIV/AIDS Surveillance Supplemental Report is not copyrighted and may be used and copied without permission. Citation of the source is, however, appreciated.

unknown authors

2007-01-01T23:59:59.000Z

102

Power electronics reliability analysis.  

SciTech Connect

This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

Smith, Mark A.; Atcitty, Stanley

2009-12-01T23:59:59.000Z

103

Auto reliability project  

Science Conference Proceedings (OSTI)

Reliability is defined as the probability that an item (system, subsystem, or component) performs according to specifications. When test data are sparse (such as with a new concept design), expert judgment can be used to estimate reliability. Using expert ...

Jane M. Booker; Thomas R. Bement

2002-01-01T23:59:59.000Z

104

Increasing the Reliability of Reliability Diagrams  

Science Conference Proceedings (OSTI)

The reliability diagram is a common diagnostic graph used to summarize and evaluate probabilistic forecasts. Its strengths lie in the ease with which it is produced and the transparency of its definition. While visually appealing, major long-...

Jochen Bröcker; Leonard A. Smith

2007-06-01T23:59:59.000Z

105

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

NLE Websites -- All DOE Office Websites (Extended Search)

All Members Meeting All Members Meeting The Gearbox Reliability Collaborative (GRC) All Members Meeting was held on February 4-5, 2013. The meeting covered advancements made across the NREL GRC project and the latest industry updates on gearbox reliability and operations and maintenance practices. The presentations covered gearbox design updates, gearbox testing updates, experimental data analysis, and operations and maintenance research. Presentations Monday, February 4 Time Presenter Organization Presentation 8:30 a.m. Paul Veers NREL Welcome 8:45 a.m. Mike Derby DOE Overview 9:05 a.m. Jon Keller NREL Gearbox Reliability Collaborative Status and Plans 9:20 a.m. Hal Link NREL New Gearbox #2 Test Plan 9:40 a.m. Hal Link NREL NWTC Dynos and Grid Simulator 10:00 a.m. Jon Keller/Brian McNiff NREL/MLI Gearbox Reliability Collaborative, Phase 3: High Speed Shaft Bearing Loads

106

Architectural design for reliability  

DOE Green Energy (OSTI)

Design-for-reliability concepts can be applied to the products of the construction industry, which includes buildings, bridges, transportation systems, dams, and other structures. The application of a systems approach to designing in reliability emphasizes the importance of incorporating uncertainty in the analyses, the benefits of optimization analyses, and the importance of integrating reliability, safety, and security. 4 refs., 3 figs.

Cranwell, R.M.; Hunter, R.L.

1997-08-01T23:59:59.000Z

107

Principal Associate Director - Science, Technology, and Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

Principal Associate Director - Science, Technology, and Engineering Principal Associate Director - Science, Technology, and Engineering Bishop oversees directorates of Chemistry, Life, and Earth Sciences; Engineering and Engineering Sciences; Experimental Physical Sciences; Information Technology; and Theory, Simulation, and Computation. Contact Operator Los Alamos National Laboratory (505 667-5061 Bishop is a Fellow of the American Physical Society, the Institute of Physics, and the American Association for the Advancement of Science; a recipient of the Department of Energy's E.O. Lawrence Award; a Humboldt Senior Fellow; and a LANL Fellow. Alan R. Bishop Principal Associate Director for Science, Technology, and Engineering Alan R. Bishop, Acting Principal Associate Director for Science, Technology and Engineering As Principal Associate Director for Science, Technology, and Engineering,

108

Photon Sciences Directorate at Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Directorate at Directorate at Brookhaven National Laboratory 2010 ANNUAL REPORT DISCOVERY 2010 AnnuAl RepoRt Photon Sciences Directorate at Brookhaven National Laboratory Photon Sciences Directorate at Brookhaven National Laboratory 2010 ANNUAL REPORT Kendra Snyder Editor Laura Mgrdichian Science Writer Mona S. Rowe Science Writer Tiffany Bowman Graphic Designer Office of Science the photon Sciences Directorate at Brookhaven national laboratory operates the national Synchrotron light Source (nSlS) and is constructing the national Synchrotron light Source II (nSlS-II). nSlS and nSlS-II are offi ce of Science user Facilities supported by the u.S. Department of energy offi ce of Science. 2010 AnnuAl RepoRt Photon Sciences Directorate at Brookhaven National Laboratory Disclaimer

109

Los Alamos director echoes cyber concerns  

NLE Websites -- All DOE Office Websites (Extended Search)

Los Alamos director echoes cyber concerns Los Alamos director echoes cyber concerns Los Alamos director echoes cyber concerns Director Charlie McMillan told a gathering of energy executives that securing the electrical grid is a major concern now and it's only becoming more serious. May 21, 2013 Los Alamos National Laboratory Director Charlie McMillan (right), with, from left, Anthony Cugini of the National Energy Technology Laboratory, Thom Mason of Oak Ridge National Laboratory, and Tomas Diaz de la Rubia of Deloitte Consulting LLP. Los Alamos National Laboratory Director Charlie McMillan (right), with, from left, Anthony Cugini of the National Energy Technology Laboratory, Thom Mason of Oak Ridge National Laboratory, and Tomas Diaz de la Rubia of Deloitte Consulting LLP. Contact Fred deSousa

110

Software reliability and dependability: a roadmap  

E-Print Network (OSTI)

Shifting the focus from software reliability to user-centred measures of dependability in complete software-based systems. Influencing design practice to facilitate dependability assessment. Propagating awareness of dependability issues and the use of existing, useful methods. Injecting some rigour in the use of process-related evidence for dependability assessment. Better understanding issues of diversity and variation as drivers of dependability. Bev Littlewood is founder-Director of the Centre for Software Reliability, and Professor of Software Engineering at City University, London. Prof Littlewood has worked for many years on problems associated with the modelling and evaluation of the dependability of software-based systems; he has published many papers in international journals and conference proceedings and has edited several books. Much of this work has been carried out in collaborative projects, including the successful EC-funded projects SHIP, PDCS, PDCS2, DeVa. He has been employed as a consultant to

Bev Littlewood; Lorenzo Strigini

2000-01-01T23:59:59.000Z

111

Chemical Sciences Division: Introduction: Director's Statement  

NLE Websites -- All DOE Office Websites (Extended Search)

Division Overview Under Construction Ali Belkacem Chemical Sciences Division Director Chemical Sciences Division Research Affiliations Our four core programs-Chemical Physics; The...

112

Weights and Measures State Directors T - V  

Science Conference Proceedings (OSTI)

... Joe Benavides, Director for Consumer Product Protection Phone: (512) 463-5706 Fax: (888) 215-5386. Utah. Mailing Address, Contact Information. ...

2013-03-05T23:59:59.000Z

113

SLAC National Accelerator Laboratory - Accelerator Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

physics. Today, the Accelerator Directorate operates and maintains SLAC's existing accelerators to provide the highest possible level of performance. Accelerator employees improve...

114

Milton Appointed as ANL LCLS Project Director  

NLE Websites -- All DOE Office Websites (Extended Search)

side of the project has been ably overseen by Efim Gluskin, Director of the Experimental Facilities Division. However, as the project ramps up, it is essential that LCLS...

115

NREL: Director's Page - Interviews and Articles  

NLE Websites -- All DOE Office Websites (Extended Search)

of Let's Talk interviews NREL Director Dr. Dan Arvizu about NREL's role in American energy policy and the challenges facing renewable energy development. Dr. Arvizu also...

116

LLNL, LANL, Sandia directors visit Russian laboratories  

NLE Websites -- All DOE Office Websites (Extended Search)

LLNL Go Home > News > News Center > Around the Lab > 073012russian 07272012 LLNL, LANL, Sandia directors visit Russian laboratories Lauren Y Devore, LLNL, (925) 422-0855,...

117

About the Deputy Director: Short Scientific Biography  

NLE Websites -- All DOE Office Websites (Extended Search)

Horst Simon is an internationally recognized expert in computer science and applied mathematics and the Deputy Director of Lawrence Berkeley National Laboratory (Berkeley Lab)....

118

Director's Office | Stanford Synchrotron Radiation Lightsource  

NLE Websites -- All DOE Office Websites (Extended Search)

Member of Technical Staff, Hewlett-Packard Co., 1978-1982. Professor (Research), Electrical Engineering, Photon Science, 1982-present. Assistant Director, SSRL, 1982-2005....

119

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

k-& +gj --%- Washington, DC 20545 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C....

120

Business Operations Directorate, Brookhaven National Laboratory...  

NLE Websites -- All DOE Office Websites (Extended Search)

BNL People Site Details Directorate Homepage Contact Us Divisions & Offices Budget Office Fiscal Services Division Other Information BNL Site Index Can't View PDFs? Business...

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

TMS Board of Directors: Srinivas Chada  

Science Conference Proceedings (OSTI)

He currently serves on the board of directors for The Minerals, Metals, and Materials Society (TMS) as the Chair of the Electronic, Magnetic, and Photonic ...

122

Reliability and Markets Program Information  

Energy.gov (U.S. Department of Energy (DOE))

Summary of the Tranmission Reliability program's Reliability and Markets activity area. The program helps to increase grid reliability and reduce costs for customers using integrated market and...

123

Director of the Office of Science Homepage | U.S. DOE Office...  

Office of Science (SC) Website

Director Home Director of the Office of Science Director Home Organization Chart .pdf file (77KB) Presentations and Testimony History Budget Contact Information Director of the...

124

Demographic Directorate 2012 Summer Internship Program  

E-Print Network (OSTI)

. This opportunity is a paid, ten-week program starting June 2012. The program offers interns an opportunity to work. The program consists of a combination of work within a particular branch, a series of training seminarsDemographic Directorate 2012 Summer Internship Program The Demographic Directorate of the United

Peterson, Blake R.

125

Assistant Director Office of the Treasurer  

E-Print Network (OSTI)

Director Bob Barto Sr. Inspector Doug McGinnis Sr. Inspector George Levinthal Project Manager Jeff Enge Sr. Inspector Mark Peppers Project Manager Peter Ryan Sr. Inspector Rick Whitehead Sr. Inspector Tom Haas Sr. Inspector Ray Aronson Associate Director Daniel Belding Project Manager Anne-Marie Nething Analyst 1 Dan

Indiana University

126

Mr. Glen Sjoblom Deputy Director  

Office of Legacy Management (LM)

J-UN 2 0 1590 J-UN 2 0 1590 Mr. Glen Sjoblom Deputy Director Di.vision of Industrial and Medical Nuclear Safety Office of Nuclear Materials Safety and Safeguards. U. S. Nuclear Regulatory C&iitii'&&; Washington, D.C. 20555 Dear Mr. Sjoblom: As a part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), the U. S. Department of Energy (DOE) is trying to identify all sites and facilities where radioactive materials were handled, processed or used in support of Manhattan Engineer. District (MED) and Atomic Energy Commission (AEC) activities from 1942 through the mid-1960's. ,The authority to conduct remed,ial action under FUSRAP, derived from the Atomic Energy Act of 1954, as amended, is limited,to those sites operated prior to the establishment of AEC licensing requirements and at sites that were

127

Mr. Glen Sjoblom Deputy Director  

Office of Legacy Management (LM)

Washington, Df: 20545 Washington, Df: 20545 ,J.LlN 2 0 19% Mr. Glen Sjoblom Deputy Director Division of Industrial and Medical Nuclear Safety Office of Nuclear Materials Safety and Safeguards U. S. Nuclear Regulatory Commission r " Washington, D.C. 20555 Dear Mr. Sjoblom: As a part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), the U. S. Department of Energy (DOE) is trying to identify all sites and facilities where radioactive materials were handled, processed or used in support of Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) activities from 1942 through the mid-1960's. The authority to conduct remedial action under FUSRAP, derived from the Atomic Energy Act of 1954, as amendedi is limited to those sites operated prior to the

128

A Viewgraph from the Director  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 A Viewgraph from the Director ...no one foresaw that the new cores would reveal a climatic flickering of great frequency and magnitude... Art Rosenfeld Global Warming Warning: Don't Fool with the Climate I am pleased to be able to bring you this column for the premier issue of our newsletter because it's an opportunity to present the Center's current favorite viewgraph. I hope that readers who decide the information presented here is useful will pass it along to others. Everything we develop at the Center, from hardware to policy, is aimed at saving energy and money through investments that will pay for themselves in a short time. In a rational market, these ideas sell themselves. But we now know that even before the 1973 oil embargo, when the payback time for

129

A Viewgraph from the Director  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 A Viewgraph from the Director Art Rosenfeld standing in front of a black board. Art Rosenfeld The Implementation Age: Don't Forget R&D The energy-efficiency community welcomes the federal government's renewed emphasis on implementing new technologies to save energy, money, and the environment. A product of this new direction is the Climate Change Action Plan, which aims to cap U.S. carbon dioxide emissions at 1990 levels by the year 2000. Building energy efficiency will play a major role in the plan in the form of strategies like: Increased government-industry-utility collaboration to produce ''market pull'' programs designed to boost sales of new technologies. Emphasis on retrofitting public buildings for energy efficiency, getting government to practice what it preaches.

130

Reliability and maintainability program  

SciTech Connect

The program's goals are to accelerate the adoption of active solar energy systems in building applications by improving the reliability and maintainability of installed systems. The project is designed to accomplish this by providing the latest information; by assisting the industry in improving reliability and maintainability; by assisting in design, manufacture, installation and maintenance of reliable and durable systems; and by assisting in the development of codes and standards. Work and accomplishments in these areas are enumerated. (LEW)

Eden, A.

1981-05-01T23:59:59.000Z

131

Human Reliability Program (HRP)  

Energy.gov (U.S. Department of Energy (DOE))

Office of SecurityHRP Training Certification- HTML- Flash10 CFR 712, Human Reliability ProgramHRP HandbookTools for Clinicians- Medication List- Medical Records Checklist

132

Materials Reliability Employment Opportunities  

Science Conference Proceedings (OSTI)

... from an in-house microfabrication facility that has ... well as access to other world-class NIST facilities. ... of membrane reliability is essential for ensuring ...

2012-10-15T23:59:59.000Z

133

General Aviation Aircraft Reliability Study  

Science Conference Proceedings (OSTI)

This reliability study estimates Complex General Aviation (GA) Aircraft System reliability. As part of an effort to successfully improve the safety and reliability of the next generation of GA aircraft, a benchmarking of the current reliability of GA ...

Pettit Duane; Turnbull Andrew

2001-02-01T23:59:59.000Z

134

Contact Lee McGetrick Director, Carbon Fiber Technology Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Director, Carbon Fiber Technology Facility (865) 574-6549 mcgetricklb@ornl.gov Craig Blue, Ph.D. Director, Manufacturing Demonstration Facility (865) 574-4351...

135

Los Alamos Lab: Associate Directorate for Theory, Simulation...  

NLE Websites -- All DOE Office Websites (Extended Search)

John Sarrao Deputy Associate Director, Paul Dotson Center Leader Frank Alexander Information Science and Technology Center (IS&T) Center Director for Nonlinear Studies (CNLS) Bob...

136

Los Alamos Lab: Associate Directorate for Theory, Simulation...  

NLE Websites -- All DOE Office Websites (Extended Search)

Alan Bishop Deputy Assoc. Director, Andrew (Andy) White Deputy Assoc. Director, Paul Dotson Center Leader Frank Alexander Information Science and Technology Center (IS&T) Center...

137

Directors Advance EM Mission with Help from Rigorous Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directors Advance EM Mission with Help from Rigorous Project Management Program Directors Advance EM Mission with Help from Rigorous Project Management Program October 30, 2013 -...

138

Secretary Bodman, Director Rumyantsev Issue Joint Statement on...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bodman, Director Rumyantsev Issue Joint Statement on Bratislava Nuclear Security Initiatives Secretary Bodman, Director Rumyantsev Issue Joint Statement on Bratislava Nuclear...

139

Anthony Cugini Named Director of DOE's National Energy Technology...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Other Agencies You are here Home Anthony Cugini Named Director of DOE's National Energy Technology Laboratory Anthony Cugini Named Director of DOE's National Energy...

140

New director joins United Way of Northern New Mexico  

NLE Websites -- All DOE Office Websites (Extended Search)

New Director Joins United Way of Northern New Mexico Community Connections: Our link to Northern New Mexico Communities Latest Issue:November 2013 All Issues submit New director...

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Hawaii electric system reliability.  

SciTech Connect

This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability "worth" and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

Silva Monroy, Cesar Augusto; Loose, Verne William

2012-09-01T23:59:59.000Z

142

Argonne National Laboratory Director's Postdoctoral Fellowship Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's Postdoctoral Fellowship Program Director's Postdoctoral Fellowship Program Instructions for Applicants Candidates for the Director's Postdoctoral Fellowships are selected based on their research and academic accomplishments, and the strength of their research proposal. They will collaborate with Argonne scientists and engineers on existing programs and on new initiatives. All applicants must identify an Argonne employee (sponsor) who will write the nomination memo and present your case in front of the Postdoctoral Committee. The sponsor could be someone who is already familiar with your research work and accomplishments through previous collaborations or professional societies. If you have not yet identified an Argonne sponsor, visit the detailed websites of the various Research

143

Photovoltaic system reliability  

SciTech Connect

This paper discusses the reliability of several photovoltaic projects including SMUD`s PV Pioneer project, various projects monitored by Ascension Technology, and the Colorado Parks project. System times-to-failure range from 1 to 16 years, and maintenance costs range from 1 to 16 cents per kilowatt-hour. Factors contributing to the reliability of these systems are discussed, and practices are recommended that can be applied to future projects. This paper also discusses the methodology used to collect and analyze PV system reliability data.

Maish, A.B.; Atcitty, C. [Sandia National Labs., NM (United States); Greenberg, D. [Ascension Technology, Inc., Lincoln Center, MA (United States)] [and others

1997-10-01T23:59:59.000Z

144

Photon Sciences | About the Photon Sciences Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

About the Photon Sciences Directorate About the Photon Sciences Directorate The Photon Sciences Directorate operates the National Synchrotron Light Source (NSLS) and is constructing the National Synchrotron Light Source II (NSLS-II), both funded by the Department of Energy Office of Science. These facilities support a large community of scientists using photons (light) to carry out research in energy and environmental sciences, physics, materials science, chemistry, biology and medicine. NSLS National Synchrotron Light Source NSLS-II National Synchrotron Light Source II This is a very exciting period for photon sciences at Brookhaven Lab and a time of unprecedented growth for the directorate. The NSLS-II Project is progressing rapidly and smoothly through design and construction, driven by

145

Director Position Center for Urban Transportation  

E-Print Network (OSTI)

Director Position Center for Urban Transportation The Center for Urban Transportation Research for state policymakers, transportation agencies, transportation professionals and the public. CUTR conducts of Transportation's Federal Transit Administration and Federal Highway Administration, the Florida Department

Arslan, Hüseyin

146

Federal Project Director Toolbox | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The DOE Orders that specifically pertain to the creation and maintenance of the PMCDP are DOE O 413.3B and DOE 0 361.1B. Click here to view a recent presentation by the Director of...

147

University Admissions: ValeriePickett,Director  

E-Print Network (OSTI)

University Admissions: ValeriePickett,Director UniversityAdmissions,MSC3A New, Appointed Regent from Clovis for term expiring January 1, 2011. Chris Anaya, Appointed Regent from Moriarty

Castillo, Steven P.

148

Baylis named new director of Diversity Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

University of Puerto Rico. Photo by Carrie MartinLLNL Baylis named new director of Diversity Programs Carenda L Martin, LLNL, (925) 424-4175, martin59@llnl.gov High Resolution...

149

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

45 UY 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr....

150

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

i+ r*y Washington, DC 20545 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301...

151

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

my 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr....

152

NREL: Research Participant Program - Director's Fellowship  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's Fellowship Director's Fellowship View NREL's Research Participant Program Video on YouTube. The NREL Director's Fellowships are designed to attract the next generation of exceptionally qualified scientists and engineers with outstanding talent and credentials in renewable energy research and related disciplines. Candidates must be a recent PhD graduate (within two years of completion), and demonstrate a promising career of leadership and research. Candidates will be selected based on eligibility, program expectations, and research proposals. Overriding consideration, when evaluating the application, will be the quality of the candidate. Successful candidates will serve a two-year term, with a possible third year renewal paid with program funding (maximum three year-appointments). The Director's

153

Hydropower Reliability Study  

Science Conference Proceedings (OSTI)

Though hydroelectric plants are highly reliable, even a 1% improvement in their availability could save the U.S. utility industry $125 million per year. This comprehensive review of hydropower data and practices recommends ways to achieve such improvement.

1984-03-01T23:59:59.000Z

154

NREL: Gearbox Reliability Collaborative - Gearbox Reliability Collaborative  

NLE Websites -- All DOE Office Websites (Extended Search)

Projects Projects Gearbox deficiencies are the result of many factors. Through gearbox modeling and testing, condition monitoring, and the failure database, the collaborative is expanding the industry's knowledge base, recommending efficient and cost-effective improvements, and facilitating immediate improvements in the gearbox life cycle. Gearbox Modeling and Testing Illustration of representative gearbox including the hub, main bearing, main shaft, gearbox, brake, high speed shaft, generator, and bed plate. A complete gearbox redesign has been completed in a collaborative effort between NREL and industry partners. This process documented and analyzed the design process and produced a new gearbox design that integrates knowledge from previous Gearbox Reliability Collaborative (GRC) activities.

155

Computation Directorate 2007 Annual Report  

SciTech Connect

If there is a single word that both characterized 2007 and dominated the thoughts and actions of many Laboratory employees throughout the year, it is transition. Transition refers to the major shift that took place on October 1, when the University of California relinquished management responsibility for Lawrence Livermore National Laboratory (LLNL), and Lawrence Livermore National Security, LLC (LLNS), became the new Laboratory management contractor for the Department of Energy's (DOE's) National Nuclear Security Administration (NNSA). In the 55 years under the University of California, LLNL amassed an extraordinary record of significant accomplishments, clever inventions, and momentous contributions in the service of protecting the nation. This legacy provides the new organization with a built-in history, a tradition of excellence, and a solid set of core competencies from which to build the future. I am proud to note that in the nearly seven years I have had the privilege of leading the Computation Directorate, our talented and dedicated staff has made far-reaching contributions to the legacy and tradition we passed on to LLNS. Our place among the world's leaders in high-performance computing, algorithmic research and development, applications, and information technology (IT) services and support is solid. I am especially gratified to report that through all the transition turmoil, and it has been considerable, the Computation Directorate continues to produce remarkable achievements. Our most important asset--the talented, skilled, and creative people who work in Computation--has continued a long-standing Laboratory tradition of delivering cutting-edge science even in the face of adversity. The scope of those achievements is breathtaking, and in 2007, our accomplishments span an amazing range of topics. From making an important contribution to a Nobel Prize-winning effort to creating tools that can detect malicious codes embedded in commercial software; from expanding BlueGene/L, the world's most powerful computer, by 60% and using it to capture the most prestigious prize in the field of computing, to helping create an automated control system for the National Ignition Facility (NIF) that monitors and adjusts more than 60,000 control and diagnostic points; from creating a microarray probe that rapidly detects virulent high-threat organisms, natural or bioterrorist in origin, to replacing large numbers of physical computer servers with small numbers of virtual servers, reducing operating expense by 60%, the people in Computation have been at the center of weighty projects whose impacts are felt across the Laboratory and the DOE community. The accomplishments I just mentioned, and another two dozen or so, make up the stories contained in this report. While they form an exceptionally diverse set of projects and topics, it is what they have in common that excites me. They share the characteristic of being central, often crucial, to the mission-driven business of the Laboratory. Computational science has become fundamental to nearly every aspect of the Laboratory's approach to science and even to the conduct of administration. It is difficult to consider how we would proceed without computing, which occurs at all scales, from handheld and desktop computing to the systems controlling the instruments and mechanisms in the laboratories to the massively parallel supercomputers. The reasons for the dramatic increase in the importance of computing are manifest. Practical, fiscal, or political realities make the traditional approach to science, the cycle of theoretical analysis leading to experimental testing, leading to adjustment of theory, and so on, impossible, impractical, or forbidden. How, for example, can we understand the intricate relationship between human activity and weather and climate? We cannot test our hypotheses by experiment, which would require controlled use of the entire earth over centuries. It is only through extremely intricate, detailed computational simulation that we can test our theories, and simulati

Henson, V E; Guse, J A

2008-03-06T23:59:59.000Z

156

NIST Testimony by Willie E. May, Director, Chemical Science ...  

Science Conference Proceedings (OSTI)

NIST Testimony by Willie E. May, Director, Chemical Science and Technology Laboratory. 2013. 032013 Testimony House ...

2013-09-24T23:59:59.000Z

157

NIST Testimony by Philip Singerman, NIST Associate Director ...  

Science Conference Proceedings (OSTI)

NIST Testimony by Philip Singerman, NIST Associate Director for Innovation & Industry Services. NIST Testimony by Philip ...

2012-08-13T23:59:59.000Z

158

Gearbox Reliability Collaborative Update (Presentation)  

SciTech Connect

This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

Sheng, S.

2013-10-01T23:59:59.000Z

159

Reconsideration of Software Reliability Measurements  

Science Conference Proceedings (OSTI)

In this paper, we discuss the major weaknesses of the software reliability measurements currently used and propose a new model of software reliability estimation. For the time being, the software reliability models are employed far from ubiquitous. As ...

Shiyi Xu

2007-10-01T23:59:59.000Z

160

Photovoltaic module reliability workshop  

DOE Green Energy (OSTI)

The paper and presentations compiled in this volume form the Proceedings of the fourth in a series of Workshops sponsored by Solar Energy Research Institute (SERI/DOE) under the general theme of photovoltaic module reliability during the period 1986--1990. The reliability Photo Voltaic (PV) modules/systems is exceedingly important along with the initial cost and efficiency of modules if the PV technology has to make a major impact in the power generation market, and for it to compete with the conventional electricity producing technologies. The reliability of photovoltaic modules has progressed significantly in the last few years as evidenced by warranties available on commercial modules of as long as 12 years. However, there is still need for substantial research and testing required to improve module field reliability to levels of 30 years or more. Several small groups of researchers are involved in this research, development, and monitoring activity around the world. In the US, PV manufacturers, DOE laboratories, electric utilities and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in this field were brought together under SERI/DOE sponsorship to exchange the technical knowledge and field experience as related to current information in this important field. The papers presented here reflect this effort.

Mrig, L. (ed.)

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Technical Report Confirms Reliability of Yucca Mountain Technical Work |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Report Confirms Reliability of Yucca Mountain Technical Technical Report Confirms Reliability of Yucca Mountain Technical Work Technical Report Confirms Reliability of Yucca Mountain Technical Work February 17, 2006 - 11:59am Addthis WASHINGTON, DC - The Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) today released a report confirming the technical soundness of infiltration modeling work performed by U.S. Geological Survey (USGS) employees. "The report makes clear that the technical basis developed by the USGS has a strong conceptual foundation and is corroborated by independently-derived scientific conclusions, and provides a solid underpinning for the 2002 site recommendation," said OCRWM's Acting Director Paul Golan. "We are committed to opening Yucca Mountain based only on sound science. The work

162

Coordination). Participants include representatives from Balancing Authorities (BAs), Reliability  

E-Print Network (OSTI)

The MRO Subject Matter Expert Team is an industry stakeholder group which includes subject matter experts from MRO member organizations in various technical areas. Any materials, guidance, and views from stakeholder groups are meant to be helpful to industry participants; but should not be considered approved or endorsed by MRO staff or its board of directors unless specified. Page | 2 Disclaimer The Midwest Reliability Organization (MRO) Standards Committee (SC) is committed to providing training and non-binding guidance to industry stakeholders regarding existing and emerging Reliability Standards. Any materials, including presentations, were developed through the MRO SC by Subject Matter Experts (SMEs) from member organizations within the MRO region. In 2012, SMEs in the field of System Operator Communications were brought together to prepare a guide for complying with NERC Reliability Standard COM-002-2 (Communications and

Will Behnke; Alliant Energy; Jacalynn Bentz; Great River Energy; Marie Knox Miso; Jacalynn Bentz; Marie Knox; Terry Harbour

2013-01-01T23:59:59.000Z

163

Photon Sciences Directorate | 2010 Annual Report | DISCOVERY...  

NLE Websites -- All DOE Office Websites (Extended Search)

NSLS Reliability The NSLS served up another excellent year, with the X-Ray Ring coming in at 95.4 percent reliability and 109.1 percent availability. The VUV Ring performed even...

164

2011 Computation Directorate Annual Report  

SciTech Connect

From its founding in 1952 until today, Lawrence Livermore National Laboratory (LLNL) has made significant strategic investments to develop high performance computing (HPC) and its application to national security and basic science. Now, 60 years later, the Computation Directorate and its myriad resources and capabilities have become a key enabler for LLNL programs and an integral part of the effort to support our nation's nuclear deterrent and, more broadly, national security. In addition, the technological innovation HPC makes possible is seen as vital to the nation's economic vitality. LLNL, along with other national laboratories, is working to make supercomputing capabilities and expertise available to industry to boost the nation's global competitiveness. LLNL is on the brink of an exciting milestone with the 2012 deployment of Sequoia, the National Nuclear Security Administration's (NNSA's) 20-petaFLOP/s resource that will apply uncertainty quantification to weapons science. Sequoia will bring LLNL's total computing power to more than 23 petaFLOP/s-all brought to bear on basic science and national security needs. The computing systems at LLNL provide game-changing capabilities. Sequoia and other next-generation platforms will enable predictive simulation in the coming decade and leverage industry trends, such as massively parallel and multicore processors, to run petascale applications. Efficient petascale computing necessitates refining accuracy in materials property data, improving models for known physical processes, identifying and then modeling for missing physics, quantifying uncertainty, and enhancing the performance of complex models and algorithms in macroscale simulation codes. Nearly 15 years ago, NNSA's Accelerated Strategic Computing Initiative (ASCI), now called the Advanced Simulation and Computing (ASC) Program, was the critical element needed to shift from test-based confidence to science-based confidence. Specifically, ASCI/ASC accelerated the development of simulation capabilities necessary to ensure confidence in the nuclear stockpile-far exceeding what might have been achieved in the absence of a focused initiative. While stockpile stewardship research pushed LLNL scientists to develop new computer codes, better simulation methods, and improved visualization technologies, this work also stimulated the exploration of HPC applications beyond the standard sponsor base. As LLNL advances to a petascale platform and pursues exascale computing (1,000 times faster than Sequoia), ASC will be paramount to achieving predictive simulation and uncertainty quantification. Predictive simulation and quantifying the uncertainty of numerical predictions where little-to-no data exists demands exascale computing and represents an expanding area of scientific research important not only to nuclear weapons, but to nuclear attribution, nuclear reactor design, and understanding global climate issues, among other fields. Aside from these lofty goals and challenges, computing at LLNL is anything but 'business as usual.' International competition in supercomputing is nothing new, but the HPC community is now operating in an expanded, more aggressive climate of global competitiveness. More countries understand how science and technology research and development are inextricably linked to economic prosperity, and they are aggressively pursuing ways to integrate HPC technologies into their native industrial and consumer products. In the interest of the nation's economic security and the science and technology that underpins it, LLNL is expanding its portfolio and forging new collaborations. We must ensure that HPC remains an asymmetric engine of innovation for the Laboratory and for the U.S. and, in doing so, protect our research and development dynamism and the prosperity it makes possible. One untapped area of opportunity LLNL is pursuing is to help U.S. industry understand how supercomputing can benefit their business. Industrial investment in HPC applications has historic

Crawford, D L

2012-04-11T23:59:59.000Z

165

2011 Computation Directorate Annual Report  

SciTech Connect

From its founding in 1952 until today, Lawrence Livermore National Laboratory (LLNL) has made significant strategic investments to develop high performance computing (HPC) and its application to national security and basic science. Now, 60 years later, the Computation Directorate and its myriad resources and capabilities have become a key enabler for LLNL programs and an integral part of the effort to support our nation's nuclear deterrent and, more broadly, national security. In addition, the technological innovation HPC makes possible is seen as vital to the nation's economic vitality. LLNL, along with other national laboratories, is working to make supercomputing capabilities and expertise available to industry to boost the nation's global competitiveness. LLNL is on the brink of an exciting milestone with the 2012 deployment of Sequoia, the National Nuclear Security Administration's (NNSA's) 20-petaFLOP/s resource that will apply uncertainty quantification to weapons science. Sequoia will bring LLNL's total computing power to more than 23 petaFLOP/s-all brought to bear on basic science and national security needs. The computing systems at LLNL provide game-changing capabilities. Sequoia and other next-generation platforms will enable predictive simulation in the coming decade and leverage industry trends, such as massively parallel and multicore processors, to run petascale applications. Efficient petascale computing necessitates refining accuracy in materials property data, improving models for known physical processes, identifying and then modeling for missing physics, quantifying uncertainty, and enhancing the performance of complex models and algorithms in macroscale simulation codes. Nearly 15 years ago, NNSA's Accelerated Strategic Computing Initiative (ASCI), now called the Advanced Simulation and Computing (ASC) Program, was the critical element needed to shift from test-based confidence to science-based confidence. Specifically, ASCI/ASC accelerated the development of simulation capabilities necessary to ensure confidence in the nuclear stockpile-far exceeding what might have been achieved in the absence of a focused initiative. While stockpile stewardship research pushed LLNL scientists to develop new computer codes, better simulation methods, and improved visualization technologies, this work also stimulated the exploration of HPC applications beyond the standard sponsor base. As LLNL advances to a petascale platform and pursues exascale computing (1,000 times faster than Sequoia), ASC will be paramount to achieving predictive simulation and uncertainty quantification. Predictive simulation and quantifying the uncertainty of numerical predictions where little-to-no data exists demands exascale computing and represents an expanding area of scientific research important not only to nuclear weapons, but to nuclear attribution, nuclear reactor design, and understanding global climate issues, among other fields. Aside from these lofty goals and challenges, computing at LLNL is anything but 'business as usual.' International competition in supercomputing is nothing new, but the HPC community is now operating in an expanded, more aggressive climate of global competitiveness. More countries understand how science and technology research and development are inextricably linked to economic prosperity, and they are aggressively pursuing ways to integrate HPC technologies into their native industrial and consumer products. In the interest of the nation's economic security and the science and technology that underpins it, LLNL is expanding its portfolio and forging new collaborations. We must ensure that HPC remains an asymmetric engine of innovation for the Laboratory and for the U.S. and, in doing so, protect our research and development dynamism and the prosperity it makes possible. One untapped area of opportunity LLNL is pursuing is to help U.S. industry understand how supercomputing can benefit their business. Industrial investment in HPC applications has historically been limited by the prohibitive cost of entry

Crawford, D L

2012-04-11T23:59:59.000Z

166

APS Director Stephenson Named Argonne Distinguished Fellow  

NLE Websites -- All DOE Office Websites (Extended Search)

Advanced Photon Source, Canadian Light Source Strengthen Ties, Expand X-ray Advanced Photon Source, Canadian Light Source Strengthen Ties, Expand X-ray Technology and Research Rose of APS and CNM One of Four DOE Early Career Award Winners Scientists Close-In on Artificial Spider Silk Ekiert Earns 2012 APSUO Franklin Award for Studies of Influenza Virus Clever Apes on WBEZ: Breaking the Fossil Record APS News Archives: 2012 | 2011 | 2010 | 2009 2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed APS Director Stephenson Named Argonne Distinguished Fellow JULY 19, 2012 Bookmark and Share Brian Stephenson Brian Stephenson has been named one of five Argonne National Laboratory Distinguished Fellows for 2012. Stephenson is the Argonne Associate Laboratory Director for Photon Sciences and Director of the U.S. Department

167

AVIATION BOARD OF DIRECTORS BYLAWS AND PROTOCOLS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AVIATION BOARD OF DIRECTORS AVIATION BOARD OF DIRECTORS BYLAWS AND PROTOCOLS The Department of Energy strives to manage its Aviation Program toward the highest standards of safety, efficiency, fairness in contracting, preservation of competition in the private sector, open communication, prudent property management, and the best examples of resource management. Toward these ends, the Department has established a management structure led by a Board of Directors comprising active Federal employee aviation managers from the Department. AUTHORITY: The following authorities serve as basis for this structure and system: Office of Management and Budget Circular A-126, FMR 102.33, DEAR 109, DOE Order 440.2B, Aviation Management Review Team Report, March 1999, and Secretary of Energy Appointment and Delegation of Authority, April 15, 1999.

168

Federal Project Director Toolbox | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Federal Project Director Toolbox Federal Project Director Toolbox Federal Project Director Toolbox Although the majority of the documents listed on this page appear elsewhere on the PMCDP Web site, the FPD Tool Box page was specifically designed with all current and aspiring FPDs in mind in that it houses all of the PMCDP's major tools and job aids in one specific, easy-to-access location. Whether you are applying for a new level of certification, or determining which courses or activities will provide you with the most continuing education credits, the Toolbox is the place to go to locate the best information that will ensure your success in the PMCDP program. Below is a list of the most prominent PMCDP job aids to include a brief summary of their respective contents: Certification Equivalency Guideline (CEG): The CEG establishes the U.S.

169

Grid reliability management tools  

SciTech Connect

To summarize, Consortium for Electric Reliability Technology Solutions (CERTS) is engaged in a multi-year program of public interest R&D to develop and prototype software tools that will enhance system reliability during the transition to competitive markets. The core philosophy embedded in the design of these tools is the recognition that in the future reliability will be provided through market operations, not the decisions of central planners. Embracing this philosophy calls for tools that: (1) Recognize that the game has moved from modeling machine and engineering analysis to simulating markets to understand the impacts on reliability (and vice versa); (2) Provide real-time data and support information transparency toward enhancing the ability of operators and market participants to quickly grasp, analyze, and act effectively on information; (3) Allow operators, in particular, to measure, monitor, assess, and predict both system performance as well as the performance of market participants; and (4) Allow rapid incorporation of the latest sensing, data communication, computing, visualization, and algorithmic techniques and technologies.

Eto, J.; Martinez, C.; Dyer, J.; Budhraja, V.

2000-10-01T23:59:59.000Z

170

North American Electric Reliability Corporation (NERC): Ensuring...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North American Electric Reliability Corporation (NERC): Ensuring a Reliable Bulk Electric System North American Electric Reliability Corporation (NERC): Ensuring a Reliable Bulk...

171

Energy Technology Program Director: Ashley Preston  

E-Print Network (OSTI)

Energy Technology Program Director: Ashley Preston Phone: 406.243.7915 Email: Ashley.Preston@UMontana.edu ace.cte.umt.edu/energy The Energy Technology Program is an online program that introduces students to the full suite of energy technologies--traditional, emerging, renewable, and alternative--and prepares them

Crone, Elizabeth

172

Interlocking Directorates and Business Groups: Belgian Evidence  

E-Print Network (OSTI)

We investigate the determinants of interlocking directorates and their impact on company performance for a Belgian sample of 286 companies affiliated with a business group and 2,136 stand-alone companies. Most of these companies are not listed. We find that companies belonging to a group have much more interlocking directorates than stand-alone companies. Group companies tend to be strongly interlocked with other group members, including parent companies, and they have more intra-group interlocks when they are located at a higher hierarchical group level. Group companies have more vertical interlocks when they are involved in an internal capital market and when they are affiliated with a diversified business group. We also find that while interlocking directorates are negatively related to the profitability of standalone companies, they do not affect the profitability of group companies. This suggests that directors in Belgian business groups are not “too busy”, and that intra-group interlocks are not facilitators of expropriation by controlling shareholders.

An Rommens; Ludo Cuyvers; Marc Deloof

2007-01-01T23:59:59.000Z

173

DIRECTORS' REPORT 2 2002 HIGHLIGHTS 4  

E-Print Network (OSTI)

, such as required in the hot carrier cell 1. DIRECTORS' REPORT 2 ARC SPECIAL RESEARCH CENTRE FOR THIRD GENERATION-conversion of photon energy (Sec. 9) and hot carrier cells (Sec. 10). In addition, work on another area, that of ther-old idea of lumines- cent solar concentrators. Hot carrier cells have been the focus of a third strand

174

Power electronics reliability.  

Science Conference Proceedings (OSTI)

The project's goals are: (1) use experiments and modeling to investigate and characterize stress-related failure modes of post-silicon power electronic (PE) devices such as silicon carbide (SiC) and gallium nitride (GaN) switches; and (2) seek opportunities for condition monitoring (CM) and prognostics and health management (PHM) to further enhance the reliability of power electronics devices and equipment. CM - detect anomalies and diagnose problems that require maintenance. PHM - track damage growth, predict time to failure, and manage subsequent maintenance and operations in such a way to optimize overall system utility against cost. The benefits of CM/PHM are: (1) operate power conversion systems in ways that will preclude predicted failures; (2) reduce unscheduled downtime and thereby reduce costs; and (3) pioneering reliability in SiC and GaN.

Kaplar, Robert James; Brock, Reinhard C.; Marinella, Matthew; King, Michael Patrick; Stanley, James K.; Smith, Mark A.; Atcitty, Stanley

2010-10-01T23:59:59.000Z

175

Argonne director Isaacs to receive Chicago Council on Science...  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne director Isaacs to receive Chicago Council on Science and Technology award June 13, 2013 Tweet EmailPrint ARGONNE, Ill. - Eric D. Isaacs, director of the U.S. Department of...

176

Department of Energy Names Director for Office of Indian Energy...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Names Director for Office of Indian Energy Policy and Makes Available 2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian...

177

EM Announces New Director of Office of External Affairs | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Announces New Director of Office of External Affairs EM Announces New Director of Office of External Affairs May 7, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM has announced...

178

Parney Albright steps down as Laboratory director, Bret Knapp...  

NLE Websites -- All DOE Office Websites (Extended Search)

steps down as Laboratory director, Bret Knapp appointed acting director James A Bono, LLNL, (925) 422-9919, bono4@llnl.gov High Resolution Image Parney Albright High Resolution...

179

Secretary Bodman and Rosatom Director Kiriyenko Meet to Discuss...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Rosatom Director Kiriyenko Meet to Discuss U.S.-Russia Nuclear Security Progress Secretary Bodman and Rosatom Director Kiriyenko Meet to Discuss U.S.-Russia Nuclear Security...

180

NIST Speeches by Richard Kayser, Director, Office of Safety ...  

Science Conference Proceedings (OSTI)

NIST Speeches by Richard Kayser, Director, Office of Safety, Health and Environment. NIST Speeches by Richard Kayser ...

2012-05-10T23:59:59.000Z

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

NIST Director Gallagher to Co-Chair White House Standards ...  

Science Conference Proceedings (OSTI)

NIST Director Gallagher to Co-Chair White House Standards Committee. For Immediate Release: March 30, 2010. ...

2010-10-05T23:59:59.000Z

182

TMS Board of Directors: Elizabeth Holm  

Science Conference Proceedings (OSTI)

... working on simulations to improve processes for lighting manufacture, microcircuit aging and reliability, and the processing and welding of advanced materials ...

183

Substation Reliability Centered Maintenance  

SciTech Connect

Substation Reliability Centered Maintenance (RCM) is a technique that is used to develop maintenance plans and criteria so the operational capability of substation equipment is achieved, restored, or maintained. The objective of the RCM process is to focus attention on system equipment in a manner that leads to the formulation of an optimal maintenance plan. The RCM concept originated in the airline industry in the 1970s and has been used since 1985 to establish maintenance requirements for nuclear power plants. The RCM process is initially applied during the design and development phase of equipment or systems on the premise that reliability is a design characteristic. It is then reapplied, as necessary, during the operational phase to sustain a more optimal maintenance program based on actual field experiences. The purpose of the RCM process is to develop a maintenance program that provides desired or specified levels of operational safety and reliability at the lowest possible overall cost. The objectives are to predict or detect and correct incipient failures before they occur or before they develop into major defects, reduce the probability of failure, detect hidden problems, and improve the cost-effectiveness of the maintenance program. RCM accomplishes two basic purposes: (1) It identifies in real-time incipient equipment problems, averting potentially expensive catastrophic failures by communicating potential problems to appropriate system operators and maintenance personnel. (2) It provides decision support by recommending, identifying, and scheduling preventive maintenance. Recommendations are based on maintenance criteria, maintenance history, experience with similar equipment, real-time field data, and resource constraints. Hardware and software are used to accomplish these two purposes. The RCM system includes instrumentation that monitors critical substation equipment as well as computer software that helps analyze equipment data.

Purucker, S.L.

1992-11-01T23:59:59.000Z

184

Component reliability testing  

SciTech Connect

Component and system reliability of active solare energy systems continues to be a major concern of designers, manufacturers, installers, and consumers. Six test loops were constructed at the Solar Energy Research Institute in Golden, Colorado, to thermally cycle active solar energy system components. Drain valves, check valves, air vents, vacuum breakers, tempering valves, and polybutylene pipe were included in the testing. Test results show poor reliabiity of some of the components and limited performance from others. The results lead to a better understanding of certain failures in the field and present designers with realistic expectations for these components.

Farrington, R.B.

1984-03-01T23:59:59.000Z

185

TO : John T. Sherman, Assistant Director for  

Office of Legacy Management (LM)

John T. Sherman, Assistant Director for John T. Sherman, Assistant Director for DATE: February 26, 1957 Domestic Procurement FROM : E.G. Vanhlarcom 'I ~~,&k,(+~~~ - i,;;, : : . .,,)_! ,A:!' SUBJ=T: SOLVENT XTHACTION OF PHOSPXMIC ACT 'On the occasion of my visit to the Dow Chemical Laboratory February 13th, I took the opportunity to discuss with them their original work on the use of solvent extraction for recovering- uranium from phosphoric acid. I told them that it was my under- standing that the operating companies in Florida were experiencing serl.cus loss of solvent and consequent high cost of this product. Er. Bailes and Ray Long explained to me that they had done the original work which was all reported in Dow--8. They said that they had worked cooperatively with both the Florida companies and with

186

FROM THE MESSAGE DIRECTOR Alex Fischer I  

NLE Websites -- All DOE Office Websites (Extended Search)

FROM THE FROM THE MESSAGE DIRECTOR Alex Fischer I can't reflect on progress in 2005 and the opportuni- ties ahead of us in 2006 without great optimism and excitement. It was certainly a busy and exciting year in the Office of Technology Transfer and Economic Development. Our staff and partners continue to aggressively pursue new opportunities to use ORNL's technologies for economic opportunity for our community, region, and country. Under the leadership of Casey Porto, re- cruited for the post of director of technol- ogy transfer from Case Western University, ORNL logged a record year in a variety of areas, including royalty income, patent reimbursements, and invention disclosures. This report details many of the exciting licensing deals that form the core mission

187

Human Resource Directors (HRD) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resource Resource Directors (HRD) Human Resource Directors (HRD) Name Organization Phone Number E-Mail Brian Carter Bonneville Power Administration (BPA) (503) 230-4527 becarter@bpa.gov Linda Brunner (Acting) Consolidated Business Center (EM) (513) 246-0518 linda.brunner@emcbc.doe.gov Connie Nottingham (Acting) Richland Operations Office (EM) (509) 373-6288 connie.nottingham@rl.doe.gov Helene Taylor Savannah River Operations (EM) (803) 952-8123 helene.taylor@srs.gov Bruce Wynn National Energy Technology Laboratory (NETL/FE) (412) 386-5259 bruce.wynn@netl.doe.gov Shandon Davis Strategic Petroleum Reserve Proj. Office (SPRO/FE) (504) 734-4382 shandon.davis@spr.doe.gov Edith Ramos Office of Inspector General (OIG) (202) 586-2470 edith.ramos@hq.doe.gov

188

Consider insulation reliability  

SciTech Connect

This paper reports that when calcium silicate and two brands of mineral wool were compared in a series of laboratory tests, calcium silicate was more reliable. And in-service experience with mineral wool at a Canadian heavy crude refinery provided examples of many of the lab's findings. Lab tests, conducted under controlled conditions following industry accepted practices, showed calcium silicate insulation was stronger, tougher and more durable than the mineral wools to which it was compared. For instance, the calcium silicate insulation exhibited only some minor surface cracking when heated to 1,200[degrees]F (649[degrees]C), while the mineral wools suffered binder burnout resulting in sagging, delamination and a general loss of dimensional stability.

Gamboa (Manville Mechanical Insulations, a Div. of Schuller International Inc., Denver, CO (United States))

1993-01-01T23:59:59.000Z

189

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 10 DATE: November 13, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Hurricane Sandy Contingency Operation -- Increase in Micro-Purchase and Simplified Acquisition Thresholds for Specific States and Counties SUMMARY: The Department of Energy (DOE) Senior Procurement Executive (SPE) has increased the micro-purchase and simplified acquisition thresholds for Hurricane Sandy Contingency Operation. With reference to Policy Flash 2013-08, Major Disaster and Emergency Declarations for Specific States from Hurricane Sandy, the attachment is a copy of the SPE determination and findings to increase micro-purchase and simplified acquisition thresholds. Specifically, it increases thresholds

190

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

44 44 DATE: May 14 , 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Procurement and Assistance Management SUBJECT: Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 SUMMARY: For Congressional notifications, there are changes to the processes and thresholds. For both contracts and financial assistance actions, Congressional notifications, in addition to the Section 311 notices and Section 301(b) reporting, are required for the following types of actions at certain dollar thresholds- * For advance notification of award actions; * Before issuing a final request for proposal or funding opportunity announcement; or

191

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Extension of SBA-DOE 8(a) Partnership Agreement SUMMARY: The current Partnership Agreement between the Small Business Administration and the Department of Energy has been extended through October 31, 2012. This Flash will be available online at the following website: http://energy.gov/management/office-management/operational- management/procurement-and-acquisition/policy-flashes. Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy,

192

TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: May 07, 2012 TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Department of Energy (DOE) Audit Guidance for For-Profit Recipients SUMMARY: The attached guidance documents provide the requirements and guidance for independent audit organizations in conducting compliance audits of for-profit recipients of federal financial assistance from DOE for FY 2011 and thereafter. Note that the guidance no longer includes the requirement for 10 CFR 600.316 audits of subrecipients. DOE issued a Federal Register Notice December 15, 2011, seeking information and comments related to the requirements and guidance for independent audit

193

TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 DATE: June 21, 2012 TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Department of Energy (DOE) Audit Guidance for For-Profit Recipients SUMMARY: Policy Flash 2012-39 provided the final audit guidance documents for independent audit forms to use in conducting compliance audits of for-profit recipients of federal financial assistance from DOE for FY 2011 and thereafter. Attached are FAQs to answer some questions we have received about the guidance. This Flash will be available online at the following website: http://energy.gov/management/office-management/operational- management/procurement-and-acquisition/policy-flashes.

194

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 DATE: April 24, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 4.6 - Assigning Identifying Numbers Outside of the Strategic Integrated Procurement Enterprise System (STRIPES) SUMMARY: The subject guide chapter provides guidance on the DOE's procedures for assigning identifying numbers to all new requisitions, solicitations and business instruments processed outside of STRIPES. This Guide Chapter does not apply to instrument numbers issued and business instruments awarded prior to the deployment of STRIPES at the DOE. The guidance in this Flash will be available online at the following website:

195

To: Procurement Directors From: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-26 2-26 Date: March 2, 2012 To: Procurement Directors From: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management Subject: Release of Department of Energy Award Fee and Incentive Fee Reports Summary: To provide a consistent Department of Energy approach on the disclosure of award fee and incentive fee reports (fee determination reports) for management and operating contracts and other major contracts at the Department's sites, the Department will, in the near future, be implementing the following policy: programs shall, at a minimum, publish a one-page score card for each contractor summarizing the fee

196

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Class Deviation from the Federal Acquisition Regulation (FAR) to Implement Office of Management and Budget (OMB) Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors SUMMARY: The Civilian Agency Acquisition Council (CAAC) issued Civilian Agency Acquisition Letter 2012-03 to distribute a class deviation clause agencies may use to require prime contractors to pay small business subcontractors on an accelerated timetable to the maximum extent practicable. This Policy Flash forwards the approved DOE class deviation and the Civilian Agency

197

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: December 7, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Class Deviation - Extending the Biobased Product Reporting Requirement SUMMARY: The Civilian Agency Acquisition Council (CAAC) issued Civilian Agency Acquisition Letter 2013-01 to encourage agencies to extend the reporting deadline contained in paragraph (c)(2) of the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, from October 31, 2012 to December 31, 2012. This Policy Flash forwards the approved DOE class deviation and the Civilian Agency Acquisition Letter 2013-01.

198

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: October 31, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Affirmative procurement of biobased products under service and construction contracts (FAR clause 52.223-2) SUMMARY: The Department's Contracting Officers are reminded of the applicability of FAR clause 52.223-2 that requires contractors to submit an annual report of their biobased purchases by October 31 in the System for Award Management (SAM) located at www.sam.gov. To increase reporting compliance, please advise your contractors of this requirement. Biobased reporting is an important element in the Administration's Blueprint for the

199

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: May 2, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Updated Reporting Requirement Checklist including the Research Performance Progress Report (RPPR) SUMMARY: Policy Flash 2011-63 transmitted the previous versions of the Reporting Requirements Checklists and the Research Performance Progress Report (RPPR) which was an attachment to the checklist. This Flash transmits a combined checklist which replaces both of the previous checklists. The RPPR has also been incorporated into the checklist. Additional updates were necessary including: correcting web site addresses, removing references to subawards for audits of

200

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

08 08 DATE: November 6, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Major Disaster and Emergency Declarations for Specific States from Hurricane Sandy SUMMARY: The President signed Major Disaster Declarations for New Jersey (DR 4086), New York (DR-4085), Connecticut (DR-4087), and Rhode Island (DR-4089). Additionally, the President signed Emergency Declarations for New Hampshire (EM-3360), Virginia (EM-3359), West Virginia (EM-3358), Delaware (EM-3357), Rhode Island (EM-3355), Pennsylvania (EM-3356), District of Columbia (EM-3352), Massachusetts (EM-3350), and Maryland (EM-3349). For updates please go to: http://www.fema.gov/disasters.

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

13 13 DATE: January 07, 2014 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS SUMMARY: The subject Acquisition Letter's purpose is to provide guidance to Contracting Officers on allowability of contractor litigation defense and settlement costs in light of Secretary of the Army v. Tecom. The guidance applies to legal costs related to allegations of discrimination where the discrimination is prohibited by the terms of the contract, such as those covered by FAR 52.222-26 (Equal Opportunity), FAR 52.222-35 (Equal Opportunity for

202

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Executive Order-Strengthening Protections Against Trafficking in Persons in Federal Contracts SUMMARY: On September 25, 2012, President Obama issued an Executive Order (EO) that seeks to strengthen protections against human trafficking in federal contracting. Currently, the Federal Acquisition Regulation (FAR) provisions explicitly addressing human trafficking are FAR 22.1705, and its associated contract clause, FAR 52.222-50, Combating Trafficking in Persons. The President's EO builds on these existing FAR provisions and provides further contractor and agency contract administration

203

Transmission Reliability | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Transmission Reliability Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The Transmission Reliability Program is aligned with this strategic plan

204

Results of the Association of Directors of Radiation Oncology Programs (ADROP) Survey of Radiation Oncology Residency Program Directors  

Science Conference Proceedings (OSTI)

Purpose: To survey the radiation oncology residency program directors on the topics of departmental and institutional support systems, residency program structure, Accreditation Council for Graduate Medical Education (ACGME) requirements, and challenges as program director. Methods: A survey was developed and distributed by the leadership of the Association of Directors of Radiation Oncology Programs to all radiation oncology program directors. Summary statistics, medians, and ranges were collated from responses. Results: Radiation oncology program directors had implemented all current required aspects of the ACGME Outcome Project into their training curriculum. Didactic curricula were similar across programs nationally, but research requirements and resources varied widely. Program directors responded that implementation of the ACGME Outcome Project and the external review process were among their greatest challenges. Protected time was the top priority for program directors. Conclusions: The Association of Directors of Radiation Oncology Programs recommends that all radiation oncology program directors have protected time and an administrative stipend to support their important administrative and educational role. Departments and institutions should provide adequate and equitable resources to the program directors and residents to meet increasingly demanding training program requirements.

Harris, Eleanor [Department of Radiation Oncology, H. Lee Moffitt Cancer Center and Research Institute, Tampa, FL (United States)], E-mail: Eleanor.Harris@moffitt.org; Abdel-Wahab, May [Department of Radiation Oncology, University of Miami, Miami, FL (United States); Spangler, Ann E. [Moncrief Radiation Oncology Center, University of Texas Southwestern Medical Center, Dallas, TX (United States); Lawton, Colleen A. [Department of Radiation Oncology, Medical College of Wisconsin, Milwaukee, WI (United States); Amdur, Robert J. [Department of Radiation Oncology, University of Florida Shands Cancer Center, Gainesville, FL (United States)

2009-06-01T23:59:59.000Z

205

Lithium battery safety and reliability  

DOE Green Energy (OSTI)

Lithium batteries have been used in a variety of applications for a number of years. As their use continues to grow, particularly in the consumer market, a greater emphasis needs to be placed on safety and reliability. There is a useful technique which can help to design cells and batteries having a greater degree of safety and higher reliability. This technique, known as fault tree analysis, can also be useful in determining the cause of unsafe behavior and poor reliability in existing designs.

Levy, S.C.

1991-01-01T23:59:59.000Z

206

Joint Staff, and J-Directorate Directives”  

E-Print Network (OSTI)

1. Purpose a. To provide the process and procedures for handling the transition and reconciliation of USJFCOM issuances into CJCS/Joint Staff directives in accordance with (IAW) references a and b. b. For the purpose of this notice, the word “issuances ” refers to USJFCOM policy documents, and the word “directives ” refers to Joint Staff policy documents. 2. Cancellation. None. 3. Applicability. This notice applies to all Joint Staff personnel and to all U.S. Joint Forces Command (USJFCOM) directorates, organizations, or other subordinate activities transitioning to the Joint Staff. It does not apply to USJFCOM entities transitioning to organizations outside the Joint Staff.

Dom/sjs Cjcs Notice

2011-01-01T23:59:59.000Z

207

Director | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Director Director Project Assessment (OPA) OPA Home About Director Staff & Responsibilities Location Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov About Director Print Text Size: A A A RSS Feeds FeedbackShare Page Click to enlarge photo. Enlarge Photo Daniel R. Lehman Daniel R. Lehman has served as Director of the Office of Project Assessment since June 1991. The majority of Mr. Lehman's over 30 years of Federal Service has been served within the Office of Science (formerly Energy Research). Mr. Lehman's key responsibilities include:

208

Designation Order No. 00-11.00 to the Executive Director of Loan Programs and Director of the Loan Program Guarantee  

Directives, Delegations, and Requirements

Designate each of the Executive Director of Loan Programs and the Director of the Loan Guarantee Program, as the Secretary of Energy's designee, as the term is ...

2010-04-30T23:59:59.000Z

209

Designation Order No. 00-12.00 to the Executive Director of Loan Programs and Director of the Advanced Technology Vehicles Manufacturing Incentive Program  

Directives, Delegations, and Requirements

Secretary or Energy designates each of the Executive Director of Loan Programs and the Director of the Advanced Technology Vehicles Manufacturing Incentive ...

2010-04-30T23:59:59.000Z

210

Distribution Reliability Trends and Correlations  

Science Conference Proceedings (OSTI)

Distribution reliability statistics, which measure sustained interruptions, are the primary benchmark used by utilities and regulators to identify service quality and to measure performance.

2005-11-29T23:59:59.000Z

211

Reliability Results of NERSC Systems  

E-Print Network (OSTI)

of various systems at NERSC. They graciously provided meReliability Results of NERSC Systems Akbar Mokhtarani,William Kramer, Jason Hick NERSC - LBNL Abstract In order to

Mokhtarani, Akbar; Petascale Data Storage Institute (PDSI)

2008-01-01T23:59:59.000Z

212

DURABILITY, RELIABILITY, AND SERVICE LIFE ...  

Science Conference Proceedings (OSTI)

Kaipeng Liu, Xiaohong Gu. In practical applications of PV solar cells, long-term weathering durability and reliable performance are essential. ...

213

Substation Configuration Reliability 1 Reliability of Substation Configurations  

E-Print Network (OSTI)

-Repairable Components," Power Learn Electric Power Engineering Education, Module PE.PAS.U15.5, 2005. #12;SubstationSubstation Configuration Reliability 1 Reliability of Substation Configurations Daniel Nack, Iowa substation, it still contains what could be described as weak points or points of failure that would lead

McCalley, James D.

214

Renzo Tomellini, EC Directorate General for Research and innovation...  

NLE Websites -- All DOE Office Websites (Extended Search)

on Critical Materials, ChairsAnimateurs: Jeff Skeer, DOE Office of Policy and International Affairs and Renzo Tomellini, EC Directorate General for Research and Innovation...

215

DOE Congratulates Under Secretary, National Lab Director and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Congratulates Under Secretary, National Lab Director and Other National Lab Scientists for Receiving Top Scientific Honor DOE Congratulates Under Secretary, National Lab...

216

Elizabeth Sellers appointed deputy director of LANL; Bechtel...  

NLE Websites -- All DOE Office Websites (Extended Search)

Kansas City Site Office from 1999 to 2003, responsible for oversight of the Kansas City Plant. Previously Sellers was director of DOE's spent nuclear fuel environmental...

217

Professor and Director of the Fusion Science Center of Extreme...  

NLE Websites -- All DOE Office Websites (Extended Search)

Professor and Director of the Fusion Science Center of Extreme States of Matter and Fast Ignition, University of Rochester | National Nuclear Security Administration Our Mission...

218

A survey of dermatology residency program directors' views on mentorship  

E-Print Network (OSTI)

directors of residency training programs have an importantgiven residency training program. This study was undertakenacademic residency training programs in the United States.

Donovan, Jeff

2009-01-01T23:59:59.000Z

219

José Montenegro: Farm Operations Director, Rural Development Center  

E-Print Network (OSTI)

Director, Organic Farming Training Program Rural Developmentorganic farming training program at the Rural Developmentpercent of the six-month training program. But also they had

Farmer, Ellen

2010-01-01T23:59:59.000Z

220

Brookhaven National Laboratory Industrial Hygiene Group Environment, Safety, Health Directorate  

E-Print Network (OSTI)

Safety & Health Services Division Industrial Hygiene Laboratory R. Wilson (0.8) __________________ 06Brookhaven National Laboratory Industrial Hygiene Group Environment, Safety, Health Directorate

Homes, Christopher C.

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Brookhaven National Laboratory Industrial Hygiene Group Environment, Safety, Health Directorate  

E-Print Network (OSTI)

Safety & Health Services Division Industrial Hygiene Laboratory/ HEPA Filter Surveillance TestingBrookhaven National Laboratory Industrial Hygiene Group Environment, Safety, Health Directorate

Homes, Christopher C.

222

DOE Names New Director of Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Names New Director of Idaho Operations Office Idaho Falls, ID - The Department of Energy today announced that Rick Provencher has been named manager of its Rick Provencher...

223

Summary of Testimony of Larry Dickerman, Director or Distribution...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Testimony of Larry Dickerman, Director or Distribution Engineering Services, American Electric Power before the House Energy and Commerce Committee March 20th 2007 Summary of...

224

Meet Assistant Director Jeff Given | OSTI, US Dept of Energy...  

Office of Scientific and Technical Information (OSTI)

Director for Information Systems and focuses on collaborative technical project management in such cross-cutting areas as cyber security, networking, server and database...

225

Meet Assistant Director Mark Martin | OSTI, US Dept of Energy...  

Office of Scientific and Technical Information (OSTI)

Assistant Director Mark Martin brings extensive experience in information program management, information security, enterprise web service development, and project management to...

226

Schneider Electric Director Initiates Strategy to Recruit IAC...  

NLE Websites -- All DOE Office Websites (Extended Search)

Schneider Electric Director Initiates Strategy to Recruit IAC Graduates Carl Castellow realized that his industrial consulting team at Schneider Electric could benefit from adding...

227

TMS Executive Director Appointed to University of California ...  

Science Conference Proceedings (OSTI)

Sep 6, 2011 ... DISLOCATION: THE YOUNG LEADERS NEWSLETTER. 09/6 - TMS Executive Director Appointed to University of California Academic Advisory ...

228

NETL: News Release - Anthony Cugini Named Director of DOE's National...  

NLE Websites -- All DOE Office Websites (Extended Search)

News Release Release Date: April 1, 2010 Anthony Cugini Named Director of DOE's National Energy Technology Laboratory Extensive Background Includes Leading Lab's Office of...

229

Director's Perspective by George Miller | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Perspective by George Miller Director's Perspective by George Miller Miller-LLNL-SEAB.10.11.pdf More Documents & Publications Computational Advances in Applied Energy...

230

Oak Ridge National Laboratory - Audit and Oversight Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

is provided below. Contacts C. Gail Lewis, CIA, CISA, CFE, CPA (inactive) - IAD Director Sandy Glazier - Executive Secretary Divisions Internal Audit Services Organization Chart...

231

Weather Normalization of Reliability Indices  

Science Conference Proceedings (OSTI)

Weather significantly increases variability of reliability indices. This project focuses on exploring statistical correlations between weather parameters and system performance indices using historical utility reliability data and weather data. Using this information, various approaches for normalizing utility performance indices for variability in weather can be developed.

2008-12-22T23:59:59.000Z

232

2004 Equipment Reliability Forum Proceedings  

Science Conference Proceedings (OSTI)

This report describes the proceedings of the EPRI 2004 Equipment Reliability Forum that was held September 13–14, 2004, in Kansas City, Missouri. This annual forum provides an opportunity for industry personnel involved in equipment reliability and related issues to exchange information and share experiences. It is structured to incorporate both formal presentations and open discussion.

2004-11-30T23:59:59.000Z

233

Boiler Reliability Optimization: Interim Guideline  

Science Conference Proceedings (OSTI)

Competitive pressures to drive costs down in the new business environment sometimes conflict with the demands of increased reliability and quality of supply. The Boiler Reliability Optimization program, which makes use of a number of applicable EPRI technologies, was developed to assess, create, and implement an effective boiler maintenance strategy for the changing business environment.

1999-11-30T23:59:59.000Z

234

North American Electric Reliability Corporation  

E-Print Network (OSTI)

Compliance filing regarding consistency of Western Electricity Coordinating Council (WECC) regional reliability Standard WECC-TOP-STD-007-0 with NERC reliability standard Dear Ms. Michael: On July 9, 2007, the North American Electric Reliability Corporation (NERC) filed an explanation regarding the consistency of WECC’s regional reliability standard WECC-TOP-STD-007-0 with respect to NERC Reliability Standard IRO-005-1. Notice of this filing was issued on July 12, 2007 with comments, protests or motions to intervene due on or before August 8, 2007. Notices of intervention and unopposed timely filed motions to intervene are granted pursuant to the operation of Rule 214 of the Commission’s Rules of Practice and Procedure (18 C.F.R. § 385.214). Any opposed or untimely filed motion to intervene is governed by the provisions of Rule 214. No protests or adverse comments were filed.

Docket No. Rr

2007-01-01T23:59:59.000Z

235

Photovoltaic performance and reliability workshop  

DOE Green Energy (OSTI)

This workshop was the sixth in a series of workshops sponsored by NREL/DOE under the general subject of photovoltaic testing and reliability during the period 1986--1993. PV performance and PV reliability are at least as important as PV cost, if not more. In the US, PV manufacturers, DOE laboratories, electric utilities, and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in the field were brought together to exchange the technical knowledge and field experience as related to current information in this evolving field of PV reliability. The papers presented here reflect this effort since the last workshop held in September, 1992. The topics covered include: cell and module characterization, module and system testing, durability and reliability, system field experience, and standards and codes.

Mrig, L. [ed.

1993-12-01T23:59:59.000Z

236

Reliability-based design optimization using efficient global reliability analysis.  

Science Conference Proceedings (OSTI)

Finding the optimal (lightest, least expensive, etc.) design for an engineered component that meets or exceeds a specified level of reliability is a problem of obvious interest across a wide spectrum of engineering fields. Various methods for this reliability-based design optimization problem have been proposed. Unfortunately, this problem is rarely solved in practice because, regardless of the method used, solving the problem is too expensive or the final solution is too inaccurate to ensure that the reliability constraint is actually satisfied. This is especially true for engineering applications involving expensive, implicit, and possibly nonlinear performance functions (such as large finite element models). The Efficient Global Reliability Analysis method was recently introduced to improve both the accuracy and efficiency of reliability analysis for this type of performance function. This paper explores how this new reliability analysis method can be used in a design optimization context to create a method of sufficient accuracy and efficiency to enable the use of reliability-based design optimization as a practical design tool.

Bichon, Barron J. (Southwest Research Institute, San Antonio, TX); Mahadevan, Sankaran (Vanderbilt University, Nashville, TN); Eldred, Michael Scott

2010-05-01T23:59:59.000Z

237

NREL: Gearbox Reliability Collaborative - About the Gearbox Reliability  

NLE Websites -- All DOE Office Websites (Extended Search)

About the Gearbox Reliability Collaborative About the Gearbox Reliability Collaborative Premature gearbox failures have a significant impact on the cost of wind farm operations. In 2007, NREL initiated the Gearbox Reliability Collaborative (GRC). The project combines field testing, dynamometer testing, analysis, modeling, condition monitoring, development of a failure database, and operations and maintenance research in a multi-pronged approach to determine why wind turbine gearboxes do not always achieve their expected design life-the time period that manufacturers expect them to last. The collaborative of manufacturers, owners, operators, researchers, and consultants focuses on gearbox modeling and testing and the development of a gearbox failure database. Collaborative members also investigate gearbox

238

ASHRAE Installs New Officers, Directors DENVER ASHRAE has installed  

E-Print Network (OSTI)

ASHRAE Installs New Officers, Directors DENVER ­ ASHRAE has installed new officers and directors for 2013-14 at its Annual Meeting held here June 22-26. The ASHRAE Presidential Address is viewable on You is William P. "Bill" Bahnfleth, Ph.D., P.E., Fellow ASHRAE, ASME Fellow, a professor of Architectural

Maroncelli, Mark

239

More Than Adopters: Competing Influences in the Interlocking Directorate  

Science Conference Proceedings (OSTI)

This study explores the competing influences of different types of board interlocks on diffusion of a strategic initiative among a population of firms. We examine a broad social network of interlocking directors in U.S. firms over a period of 17 years ... Keywords: board of directors, diffusion, governance, interlocks, social networks

Brian L. Connelly; Jonathan L. Johnson; Laszlo Tihanyi; Alan E. Ellstrand

2011-05-01T23:59:59.000Z

240

Photon Sciences Directorate | 2010 Annual Report | People  

NLE Websites -- All DOE Office Websites (Extended Search)

We the People We the People we the people Over 3,000 people carried out the activities of the Photon Sciences Directorate during FY10. This included more than 380 Photon Sciences staff members, 36 employees from other Brookhaven Lab organizations, nearly 340 contractors, and more than 2,200 visiting scientists - or "users" - who came to NSLS during the year to run experiments in fields ranging from biology to materials science. Among the Photon Sciences staff, 22 percent were scientists, 32 percent were professionals (including engineers), 31 percent were technicians, 11 percent were support staff, and 4 percent were managers. Staff from other Brookhaven Lab organizations, who typically worked 50 percent or more of their time on Photon Sciences activities, came from

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

oi Energy oi Energy rk rA$i Washington. DC 20545 .-~~~ ~ MY 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr. Schafer: As you know, the Department of Energy (DOE) is implementing a program to identify sites that may. be radiologically contaminated as a result of DOE predecessor operations and to correct any problems associated with this contamination if there is DOE authority to do so. Reviews of historical materials from the Manhattan Engineer District (MED) and Atomic Energy Cosnnission (AEC) era conducted in support of this program have identified a number of active and former Department of Defense (DOD) installations and DOD contractor sites involved in activities related to the MED/AEC

242

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

confident~~al." These site names were provided to Col. Spence confident~~al." These site names were provided to Col. Spence In a subsequent letter and are not Included on the enclosed lfst. If,you have any questions regarding this letter, call me at 353-4716. Questions regarding the lfst or spedfic sites should be dlrected to Mr. Andrew Wallo of my staff at.353-5439. - Sincerely, J James J. Fiore, Director Divisjon of Facility and Site Decoainissioning Projects Office'of Nuclear Energy 3 Enclosures bee: Aerospace' NE-20 RF \,NE-23 RF Wallo RF NEG (4) x NE-23:AWallo:ph:353-5439:5/28/87:IBM:148/9: NE-23 >J.%= 5K%7 NE-23 Fiore @?f87 ENCLOSURE 1 , .., ;: v: ., . '" ._~ .> DEPARTMENT OF THE Installation/Facility 1. Alabama Ordnance Works Sylacauga, AL ;' 2. Morgantown Ordnance Works Morgantown, WV

243

Mr. William Mendoza Acting Executive Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

William Mendoza William Mendoza Acting Executive Director Department of Energy Washing!on, DC 20585 May4, 2011 White House Initiative on Tribal Colleges and Universities Department of Education 400 Maryland A venue, SW Washington, DC 20202 Dear Mr. Mendoza: Enclosed is the Department of Energy's (DOE) Fiscal Year (FY) 2010 Annual Performance Report on our activities to assist Tribal College and Universities (TCUs). DOE is submitting this information in accordance with Executive Order 13270. In FY 2010, DOE provided $275,000 in total expenditures for TCUs, an increase of $169,500 from the amount provided to TCU s in FY 2009. In an effort to raise the level of support in future years, DOE will continue to set funding goals and to identify opportunities for additional

244

Director, health Physics Office Columbia University  

Office of Legacy Management (LM)

f. 3 -J f. 3 -J Mr. Philip tori0 Director, health Physics Office Columbia University 289 Engineering Terrace 520 West 120th Street New York, New York 10027 NY.3 "I A\, 4 f- ' :""5 . . ;. ,_ i._ ' L, Dear Mr. Lorio: The Department of Energy (DOE), as part of its Formerly Utilized Sites Remedial Action Program (FUSRAP), has reviewed information on Columbia University facilities to determine whether they contain residual radioactivity traceable to activities conducted on behalf of the Manhattan Engineer District or the Atomic Energy Commission (predecessors to DOE). A radiological survey indicated that the radiation levels are equal to natural background in all areas not currently in use for licensed operations with radionuclides, Therefore, no remedial action is required,

245

Introductory Remarks - Maurice Goldhaber, Director, Brookhaven National  

NLE Websites -- All DOE Office Websites (Extended Search)

contents as they appeared in the original proceedings contents as they appeared in the original proceedings Return to 1968 Proceedings Home Page Directly Jump to 1st Week 2nd Week 3rd Week 4th Week 5th Week 6th Week Author Index Introductory Remarks - Maurice Goldhaber, Director, Brookhaven National Laboratory iii Editor's Preface - Albert G. Prodell, Brookhaven National Laboratory iv Introduction - John P. Blewett, Brookhaven National Laboratory v FIRST WEEK - SUPERCONDUCTING RF CAVITIES AND LINACS Chairman: H.A. Schwettman, Stanford University (Photos) The Development of Low Temperature Technology at Stanford and its Relevance to High Energy Physics 1 H. Alan Schwettman, Stanford University Q Measurements on Superconducting Cavities at S-Band 13 H. Hahn, H.J. Halama, and E.H. Foster, Brookhaven National Laboratory

246

High Temperature Materials Laboratory (HTML) - PSD Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

filler A National Resource for Collaborative Materials Research The High Temperature Materials Laboratory (HTML) User Program is on hiatus due to federal budget reductions. However, research projects at the HTML still may be conducted on a cost-recovery basis through the Work for Others (WFO) Program or under a Cooperative R&D Agreement (CRADA). Dr. Edgar Lara-Curzio, HTML Director Tel: 865.574.1749 Fax: 865.574.4913 laracurzioe@ornl.gov Christine Goudy, Administrative Specialist Tel: 865.574.8295 Fax: 865.574.4913 goudyc@ornl.gov Oak Ridge National Laboratory [MST Home] [ORNL Home] [Site Index] [Search][Disclaimer] [Webmaster] Oak Ridge National Laboratory is a national multi-program research and development facility managed by UT-Battelle, LLC for the U.S. Department of Energy

247

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

MP.Y 2 9 1987 MP.Y 2 9 1987 -f/j ' I ,DL -3 d Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr. Schafer: As you know, the Department of Energy (DOE) is implementing a program to identify sites that may be radiologically contaminated as a result of DOE predecessor operations and to correct any problems associated with this contamination if there is DOE authority to do so. Reviews of historical materials from the Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) era conducted in support of this program have identified a number of active and former Department of Defense (DOD) installations and DOD contractor sites involved in activities related to the MED/AEC

248

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

Mr. Carl Schafer Mr. Carl Schafer Director of Environmental Policy 1_ Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr. Schafer: As YOU know, the Department of Energy (DOE) is implementing, a program to identify sites that may be radiologically contaminated as a result of ,DOE predecessor operations and to correct any problems associated with this contamination if there is DOE authority to do' so. Reviews of historical materials from the 'Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) era conducted in support of this program have identified a number of active and former Department of Defense (DOD) installations and DOD contractor sites involved in activities related to the MED/AEC

249

Mr. Carl Schafer Director of Environmental Policy  

Office of Legacy Management (LM)

45 45 UY 2 9 1987 Mr. Carl Schafer Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon Washington, D.C. 20301 Dear Mr. Schafer: As you know, the Department of Energy (DOE) is implementing, a program to identify sites that may be radiologically contaminated as a result of.DOE predecessor operations and to correct any problems associated with this contamination if there is DOE authority to do so. Reviews of historical materials from the Manhattan Engineer District (MED) and Atomic Energy Commission (AEC) era conducted in support of this program have identified a number of active and former Department of Defense (DOD) installations and DOD contractor sites involved in activities related to the MED/AEC

250

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36 36 DATE: March 7 , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 SUMMARY: Since we previously notified you in Policy Flash 2012-44 for Congressional notifications, there are changes to the process. On March 15, 2013, the automated system will be implemented via a phased approach. As your office transitions to the automated system, reporting for awards and modifications shall be through the automated system. For offices which will not begin using the automated system until later, these offices shall continue to do manual reporting

251

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-46 POLICY FLASH 2013-46 DATE: April 18, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Awardee Share in STRIPES SUMMARY: A problem has been identified with completing the awardee share fields on the FAADS/FAADS Plus reporting screen in STRIPES. Data quality is an area of major focus especially for the data being sent to USASpending.gov as required by the Federal Funding and Transparency Act. The attached Awardee Share Procedures detail the procedures for correctly reporting the awardee share (also known as the cost share, recipient share, and non-federal share) on the FAADS/FAADS Plus screen in STRIPES.

252

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-58 POLICY FLASH 2013-58 DATE: June 5, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Guide for Financial Assistance SUMMARY: Attached is a revised Guide for Financial Assistance. The Guide has been updated to reflect changes to web sites, organization names, systems, and DOE policies and practices since the guide was last issued. The revision date has been inserted in the section heading for all sections that had substantive changes (not just web site or organization name changes). This flash and its attachments may be viewed at http://management.energy.gov/policy_guidance/policy_flashes.htm.

253

MEMORANDUM FOR HUMAN RESOURCES DIRECTORS FROM: SUBJECT: ~~k.__--- SARAH J. B LLA, DIRECTOR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 MEMORANDUM FOR HUMAN RESOURCES DIRECTORS FROM: SUBJECT: ~~k.__--- SARAH J. B LLA, DIRECTOR OFFICE OF AN CAPITAL MANAGEMENT POLICY GUIDANCE MEMORANDUM #21 FAMILY MEMBERS The Department of Energy has maintained a broad definition for a family member to include "any individual related by blood or affinity whose close association with the employee is the equivalent of a family relationship". This is part of the definition for a family member that is located on page 7 of the DOE Handbook on Leave and Absence. We believe that it is consistent with the current administration's efforts to extend services and benefits to same-sex partners (see the President's June 2, 2010, memorandum at www.whitehouse.gov/the-press-office/presidential-memorandum-extension-benefits-

254

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48 48 DATE: June 7, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Interim Reporting for Advanced Notifications of Awards (ANA) SUMMARY: With reference to Policy Flash 2012-44 and the postponement of the ANA system production date of June 1, 2012, the increased dollar thresholds remain in effect for advanced notification of award actions. Until the new ANA system is put into production, the existing ANA web portal should still be used by completing and submitting the revised DOE Form 4220.10, Congressional Grant/Contractor Notification. The form is located in STRIPES or at the DOE webpage: http://energy.gov/cio/downloads/congressional-and-intergovernmental-affairs-ci-notification.

255

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4-10 4-10 DATE: November 26 , 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Update to Congressional Notifications - Full Implementation of Advanced Notification of Awards (ANA) System SUMMARY: Policy Flash 2013-36 transmitted Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6 describing the revised ANA process. There are no changes to these two chapters. As described in the earlier Policy Flash, the system was being implemented in a Phased approach. On October 25, 2013, the second and final phase of the ANA system was implemented. The system is now mandatory for all DOE organizations as

256

First NERSC Director John Killeen Dies at 87  

NLE Websites -- All DOE Office Websites (Extended Search)

First NERSC Director First NERSC Director John Killeen Dies at 87 First NERSC Director John Killeen Dies at 87 August 24, 2012 Jon Bashor, Jbashor@lbl.gov, +1 510 486 5849 XBD9908-01785.jpg John Killeen, NERSC's founding director, also directed its two predecessors. John Killeen, the founding director of what is now known as the National Energy Research Scientific Computing Center (NERSC), died August 15, 2012 at age 87. Killeen led the Center from 1974 until 1990, when he retired. The Department of Energy conferred its highest honor, the Distinguished Associate Award, on Killeen in 1980 in recognition of his outstanding contribution to the magnetic fusion energy program. Initially known as the Controlled Thermonuclear Research Computer Center when established in 1974 at Lawrence Livermore National Laboratory, the

257

Beard to lead Business, Operations Directorate; Girrens named head of  

NLE Websites -- All DOE Office Websites (Extended Search)

Carl Beard new PADOPS Director Carl Beard new PADOPS Director Beard to lead Business, Operations Directorate; Girrens named head of Engineering Beard came to Los Alamos in 2006 to help lead the Stockpile Manufacturing and Support organization. May 4, 2011 Carl Beard Carl Beard Contact Steve Sandoval Communicatons Office (505) 665-9206 Email LOS ALAMOS, New Mexico, May 4, 2011-Carl Beard is the new principal associate director for Business and Operations at Los Alamos National Laboratory. Beard succeeds Mike Mallory, who earlier this year announced his retirement. "Carl is a highly accomplished and versatile leader, managing a wide range of scientific and manufacturing operations," Laboratory Director Michael Anastasio said. "At Los Alamos and elsewhere, Carl's teams have improved productivity and safely executed programs," he said, noting that

258

DOE Announces New Executive Director of Loan Guarantee Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Director of Loan Guarantee Program Executive Director of Loan Guarantee Program DOE Announces New Executive Director of Loan Guarantee Program November 10, 2009 - 12:00am Addthis Washington D.C. --- Underscoring his commitment to strengthen and streamline the Department of Energy's operations, Secretary Steven Chu today named Jonathan Silver Executive Director of the Department's loan program office. In this role, Silver will oversee the Department's Loan Guarantee Program as well as the Advanced Technology Vehicles Manufacturing (ATVM) loan program. Silver will report directly to Secretary Chu, helping accelerate the application review process for both programs. As Executive Director, Silver will be responsible for staffing the programs and leading origination, analysis, and negotiation, as well as managing the full range of the

259

Energy Innovation Hub Directors Visit the Hill | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Directors Visit the Hill Directors Visit the Hill Energy Innovation Hub Directors Visit the Hill April 24, 2013 - 5:39pm Addthis Rep. Chaka Fattah (D-PA) and Acting Secretary of Energy Daniel Poneman speak during an event on Capitol Hill featuring the directors of the five energy innovation hubs. | Energy Department video. Ben Dotson Ben Dotson Project Coordinator for Digital Reform, Office of Public Affairs What is an Energy Innovation Hub? Modeled after the strong scientific management characteristics of the Manhattan Project and AT&T Bell Laboratories, the Energy Innovation Hubs are integrated research centers that combine basic and applied research with engineering to accelerate scientific discovery that addresses critical energy issues. Yesterday, the directors of the Energy Department's Energy Innovation Hubs

260

Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of  

NLE Websites -- All DOE Office Websites (Extended Search)

Associate Director Of Environmental Programs Associate Director Of Environmental Programs Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of Environmental Programs Mousseau currently works for the Lab's transuranic waste disposal program. September 18, 2012 Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Contact Communications Office (505) 667-7000 "Jeff shares my personal commitment to sustaining the current momentum of waste removal and cleanup that the Lab has steadily built over the past five years." Will Oversee Transuranic Waste Disposal and Environmental Cleanup Projects LOS ALAMOS, N.M., September 18, 2012-Los Alamos National Laboratory today

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Energy Innovation Hub Directors Visit the Hill | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Innovation Hub Directors Visit the Hill Energy Innovation Hub Directors Visit the Hill Energy Innovation Hub Directors Visit the Hill April 24, 2013 - 5:39pm Addthis Rep. Chaka Fattah (D-PA) and Acting Secretary of Energy Daniel Poneman speak during an event on Capitol Hill featuring the directors of the five energy innovation hubs. | Energy Department video. Ben Dotson Ben Dotson Project Coordinator for Digital Reform, Office of Public Affairs What is an Energy Innovation Hub? Modeled after the strong scientific management characteristics of the Manhattan Project and AT&T Bell Laboratories, the Energy Innovation Hubs are integrated research centers that combine basic and applied research with engineering to accelerate scientific discovery that addresses critical energy issues. Yesterday, the directors of the Energy Department's Energy Innovation Hubs

262

Mound Plant Director's Final Findings and Orders, October 4, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Mound Plant Director's Final Findings and Orders, October 4, 1995 Page 1 of 16 Mound Plant Director's Final Findings and Orders, October 4, 1995 Page 1 of 16 EM Home | Regulatory Compliance | Environmental Compliance Agreements Mound Plant Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Mound Facility : Findings and Order P.O. Box 66 : Miamisburg, Ohio 45343-0066 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution X. Funding XI. Other Applicable Laws XII. Reservation of Rights XIII. Modification

263

Inherently Reliable Boiler Component Design  

Science Conference Proceedings (OSTI)

This report summarizes the lessons learned during the last decade in efforts to improve the reliability and availability of boilers used in the production of electricity. The information in this report can assist in component modifications and new boiler designs.

2003-03-31T23:59:59.000Z

264

EPRI Distribution Reliability Practices Repository  

Science Conference Proceedings (OSTI)

 A key objective of the Electric Power Research Institute’s (EPRI’s) research into distribution reliability practices is to identify, document, and provide practice summary descriptions to research participants in a format that facilitates comparison and aids decision makers in identifying the practices in place at other utilities that can be applied to a decision maker’s utility to improve performance.This report presents distribution reliability practice results ...

2012-10-19T23:59:59.000Z

265

Photovoltaics performance and reliability workshop  

DOE Green Energy (OSTI)

This document consists of papers and viewgraphs compiled from the proceedings of a workshop held in September 1992. This workshop was the fifth in a series sponsored by NREL/DOE under the general subject areas of photovoltaic module testing and reliability. PV manufacturers, DOE laboratories, electric utilities and others exchanged technical knowledge and field experience. The topics of cell and module characterization, module and system performance, materials and module durability/reliability research, solar radiation, and applications are discussed.

Mrig, L. [ed.] [ed.

1992-11-01T23:59:59.000Z

266

Photovoltaics performance and reliability workshop  

DOE Green Energy (OSTI)

This document consists of papers and viewgraphs compiled from the proceedings of a workshop held in September 1992. This workshop was the fifth in a series sponsored by NREL/DOE under the general subject areas of photovoltaic module testing and reliability. PV manufacturers, DOE laboratories, electric utilities and others exchanged technical knowledge and field experience. The topics of cell and module characterization, module and system performance, materials and module durability/reliability research, solar radiation, and applications are discussed.

Mrig, L. (ed.) [ed.

1992-01-01T23:59:59.000Z

267

Deputy Director for Resource Management Homepage | U.S. DOE Office...  

Office of Science (SC) Website

Deputy Director Biography Organization Contact Information Deputy Director for Resource Management U.S. Department of Energy SC-4Forrestal Building 1000 Independence Ave., SW...

268

A technique for early software reliability prediction  

Science Conference Proceedings (OSTI)

In early developmental stages of software, failure data is not available to determine the reliability of software. But developers need reliability prediction for quality assessment and resource planning. We propose a model based on Reliability Block ...

Rakesh Tripathi; Rajib Mall

2005-12-01T23:59:59.000Z

269

Director of the National Ignition Facility, Lawrence Livermore National  

NLE Websites -- All DOE Office Websites (Extended Search)

Director of the National Ignition Facility, Lawrence Livermore National Director of the National Ignition Facility, Lawrence Livermore National Laboratory | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Edward Moses Director of the National Ignition Facility, Lawrence Livermore National Laboratory

270

Associate director for Physical and Life Sciences, Lawrence Livermore  

National Nuclear Security Administration (NNSA)

Associate director for Physical and Life Sciences, Lawrence Livermore Associate director for Physical and Life Sciences, Lawrence Livermore National Laboratory | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > William Goldstein Associate director for Physical and Life Sciences, Lawrence Livermore

271

LS Directorate Science Advisory Committee (SAC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Photon Sciences Science Advisory Committee (SAC) Photon Sciences Science Advisory Committee (SAC) Charter The Photon Sciences Science Advisory Committee (SAC) is responsible for advising the Associate Laboratory Director (ALD) for Photon Sciences on issues related to the scientific utilization of Photon Sciences facilities and on developments required to achieve and maintain the highest possible scientific productivity. In keeping with this, the SAC will provide advice on the following topics: Scientific output and utilization of Photon Sciences facilities Long-term scientific directions Planning, development, and operation of Photon Sciences facilities Policies and procedures relevant to user access and utilization of scientific facilities Members are appointed by the ALD for three-year terms, renewable by mutual consent. The Chair of the Photon Sciences Users' Executive Committee will be an ex-officio member of the SAC. In general, the full SAC will meet at least annually. The ALD, in consultation with the chair of the SAC, may call additional SAC meetings as necessary. The output of the SAC will consist of a confidential report of their findings and recommendations conveyed in a written report submitted to the ALD shortly after each SAC meeting.

272

Recommendations to Address Power Reliability Concerns Raised...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability Concerns Raised as a Result of Pending Environmental Regulations for Electric Generation Stations Recommendations to Address Power Reliability Concerns Raised as a...

273

Demand Response as a System Reliability Resource  

NLE Websites -- All DOE Office Websites (Extended Search)

Demand Response as a System Reliability Resource Title Demand Response as a System Reliability Resource Publication Type Report Year of Publication 2012 Authors Eto, Joseph H.,...

274

Comments of North American Electric Reliability Corporation ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments of North American Electric Reliability Corporation...

275

Maximal Reliability for Unit-weighted Composites  

E-Print Network (OSTI)

Maximal Reliability for Unit-weighted Composites Peter M.Maximal Reliability for Unit-weighted Composites Althoughconsistency coefficient for a unit-weighted composite. The

Peter M. Bentler

2011-01-01T23:59:59.000Z

276

Reliability Technology earns prestigious Los Alamos award  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability Technology earns award Reliability Technology earns prestigious Los Alamos award LANL has honored Michael Hamada, Harry Martz and a team of researchers with its first...

277

Information Concerning Reliability Impacts under Various System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System...

278

Electricity & Energy Reliability (WFP) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity & Energy Reliability (WFP) Electricity & Energy Reliability (WFP) The purpose of the workforce Plan is to provide focus and direction to Human Resources (HR) strategy....

279

Electronic reliability estimation: how reliable are the results?  

Science Conference Proceedings (OSTI)

The development of Safety Critical Systems requires the compliance to several safety standards and regulations. Since, most of the times, human life is at stake, it is crucial to fully understand the behaviour of the system being developed in order to ... Keywords: MIL-Hdbk-217F, MTTF, estimation, reliability

Nuno Silva; Rui Lopes

2012-09-01T23:59:59.000Z

280

O'Brian Named Director of NIST Boulder Laboratories  

Science Conference Proceedings (OSTI)

... electromagnetic fields; optoelectronics; chemical engineering; materials reliability; laser physics; quantum and optical physics; and computational ...

2012-09-20T23:59:59.000Z

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

DOE Congratulates Under Secretary, National Lab Director and Other National  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Congratulates Under Secretary, National Lab Director and Other Congratulates Under Secretary, National Lab Director and Other National Lab Scientists for Receiving Top Scientific Honor DOE Congratulates Under Secretary, National Lab Director and Other National Lab Scientists for Receiving Top Scientific Honor April 29, 2010 - 12:00am Addthis Washington, DC - U.S. Department of Energy Under Secretary for Science Steven E. Koonin, SLAC National Accelerator Laboratory Director Persis Drell, and other National Lab affiliated scientists and engineers are among the 72 new members elected to the National Academy of Sciences (NAS). NAS is a private, nonprofit, honorific society of distinguished scholars engaged in scientific and engineering research, dedicated to furthering science and technology and to their use for the general welfare.

282

Summary of Testimony of Larry Dickerman, Director or Distribution  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary of Testimony of Larry Dickerman, Director or Distribution Summary of Testimony of Larry Dickerman, Director or Distribution Engineering Services, American Electric Power before the House Energy and Commerce Committee March 20th 2007 Summary of Testimony of Larry Dickerman, Director or Distribution Engineering Services, American Electric Power before the House Energy and Commerce Committee March 20th 2007 Summary of Testimony of Larry Dickerman, Director or Distribution Engineering Services, American Electric Power before the House Energy and Commerce Committee March 20th 2007. American Electric Power (AEP) is one of the nation's largest electricity generators with over 5 million retail consumers in 11 states. AEP is the leader among US utilities for deployment of large-scale battery-based energy storage. AEP supports the adoption of

283

Photon Sciences Directorate | 2010 Annual Report | DISCOVERY at Light Speed  

NLE Websites -- All DOE Office Websites (Extended Search)

BNL People BNL People 2010 ANNUAL REPORT Photon Sciences Directorate at Brookhaven National Laboratory Reflections on the Year Steve Dierker Steve Dierker, Associate Laboratory Director for Photon Sciences This is a very exciting period for photon sciences at Brookhaven National Laboratory. It is also a time of unprecedented growth for the Photon Sciences Directorate, which operates the National Synchrotron Light Source (NSLS) and is constructing NSLS-II, both funded by the Department of Energy's Office of Science. Reflecting the quick pace of our activities, we chose the theme "Discovery at Light Speed" for the directorate's 2010 annual report, a fiscal year bookended by October 2009 and September 2010. The year began with the news that NSLS users Venki Ramakrishnan of

284

Office Director, Department of Energy, Sophia, Bulgaria | National Nuclear  

National Nuclear Security Administration (NNSA)

Director, Department of Energy, Sophia, Bulgaria | National Nuclear Director, Department of Energy, Sophia, Bulgaria | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Riaz Awan Office Director, Department of Energy, Sophia, Bulgaria Riaz Awan Riaz Awan Role: Office Director, Department of Energy, Sophia, Bulgaria

285

Climate Change Institute director wants to increase information...  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Change Science Institute director wants to increase information Jack Fellows Jack Fellows (hi-res image) Listen to the audio OAK RIDGE, Tenn., Nov. 21, 2013 - Jack Fellows,...

286

Live with the Energy Innovation Hub Directors | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

with our three Energy Innovation Hubs directors. You can send in your questions on Facebookenergygov, to Twitter.comenergy or via e-mail at newmedia@hq.doe.gov before and...

287

Search process for Lawrence Livermore director, LLNS president...  

NLE Websites -- All DOE Office Websites (Extended Search)

6.13search 11262013 Search process for Lawrence Livermore director, LLNS president gets under way Lynda L Seaver, LLNL, (925) 423-3103, seaver1@llnl.gov LIVERMORE, Calif. - The...

288

Gail Harlamoff: Executive Director, Life Lab Science Program  

E-Print Network (OSTI)

started off with a past apprentice, Doron Comerchero. He’sWhat?! project director. He was an apprentice, and whilehe was an apprentice— Rabkin: This was at CASFS. Harlamoff:

Rabkin, Sarah

2010-01-01T23:59:59.000Z

289

Microphotonic parabolic light directors fabricated by two-photon lithography  

E-Print Network (OSTI)

light directors for producing collimated beams for applications in advanced solar cell and light-emitting diode designs. VC 2011 American Institute of Physics. [doi:10.1063/1.3648115] Planar micro- and nano

Heaton, Thomas H.

290

David Price appointed to IHMM board of directors  

NLE Websites -- All DOE Office Websites (Extended Search)

213price 03222013 David Price appointed to IHMM board of directors Donald B Johnston, LLNL, (925) 423-4902, johnston19@llnl.gov Printer-friendly David Price Global Security's...

291

Associate Directorate of Plutonium Science and Manufacturing Workforce Development Program  

E-Print Network (OSTI)

Associate Directorate of Plutonium Science and Manufacturing Workforce Development Program Issue No elements address workforce challenges faced by a Pu Enterprise Environment with a focus on Pu Sustainment. The Plutonium Science & Manufacturing Summer Student Program (PSMSSP) supports the Laboratory's need

292

Former Directors | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

About » History » Former Directors About » History » Former Directors About Organization Budget Field Offices Federal Advisory Committees History Former Directors Scientific and Technical Information Honors & Awards Jobs Brochures, Logos, & Information Resources Contact Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 History Former Directors Print Text Size: A A A RSS Feeds FeedbackShare Page Atomic Energy Commission Division of Research James B. Fisk 1947 - 1948 Kenneth S. Pitzer 1948 - 1951 Thomas H. Johnson 1951 - 1957 John H. Williams 1958 - 1959 Paul W. McDaniel 1959 - 1972 John M. Team * 1973 - 1974 Energy Research and Development Administration John M. Team * 1975 - 1976 Robert L. Hirsch ** 1976 - 1977

293

Secretary Bodman, Director Rumyantsev Issue Joint Statement on Bratislava  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bodman, Director Rumyantsev Issue Joint Statement on Bodman, Director Rumyantsev Issue Joint Statement on Bratislava Nuclear Security Initiatives Secretary Bodman, Director Rumyantsev Issue Joint Statement on Bratislava Nuclear Security Initiatives November 9, 2005 - 2:20pm Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel Bodman and Russian Federal Atomic Energy Agency Director, Aleksandr Rumyantsev today released a joint statement on the status of the Bratislava Nuclear Security Initiative. The Bratislava Initiative was announced by President George W. Bush and Russian President Vladimir Putin in February, 2005 and aims, in part, to reduce the threat of nuclear and radiological proliferation. "The United States and Russia bear unique responsibilities in the area of nuclear nonproliferation," Secretary Bodman said. "The Bratislava

294

Motion of Robert G. Burnley, Director the Commonwealth of Virginia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Robert G. Burnley, Director the Commonwealth of Virginia of Robert G. Burnley, Director the Commonwealth of Virginia Department of Environmental Quality to Deny the District of Columbia Public Service Commission's Petition Further Analysis of Environmental Impacts of Requested Relief Motion of Robert G. Burnley, Director the Commonwealth of Virginia Department of Environmental Quality to Deny the District of Columbia Public Service Commission's Petition Further Analysis of Environmental Impacts of Requested Relief Docket No. EO-05-01: Motion of Robert G. Burnley, Director the Commonwealth of Virginia Department of Environmental Quality to Deny the District of Columbia Public Service Commission's Petition on the Grounds that the Commission May Not Lawfully Grant the Requested Relief; or, in the Alternative, to Defer Action Pending Further Analysis of Environmental

295

DOE's National Laboratory Directors Highlight Scientific Merits of GNEP |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

National Laboratory Directors Highlight Scientific Merits of National Laboratory Directors Highlight Scientific Merits of GNEP DOE's National Laboratory Directors Highlight Scientific Merits of GNEP May 2, 2006 - 10:29am Addthis WASHINGTON , DC - Directors of nine of the Department of Energy's (DOE) national laboratories today announced their support for the Global Nuclear Energy Partnership (GNEP) and discussed the collaboration among the labs in carrying out the partnership. GNEP, part of President Bush's Advanced Energy Initiative, will support advanced technologies to recycle spent nuclear fuel and promote emissions-free nuclear energy in a more proliferation-resistant manner. President Bush has requested $250 million in fiscal year (FY) 2007 for GNEP. "The Global Nuclear Energy Partnership demonstrates the enormous role that

296

R. L. Fu;rknsr, Acting Director  

Office of Legacy Management (LM)

L( i)~J <"j L( i)~J <"j R. L. Fu;rknsr, Acting Director Division of lzlw ?hteri~s ~SJB88~8c~atiOTlhlu aCOI%tre;etfot th6 Sfi6tOth6 C~SSiOrr Of upto2oo,cmpoundru~~ paryear a6 a,bglprobuctfroar ph08$ht6 op6rations at East Tsqm, Pioridaa ma contr8ct jaawides iOr a fi%Rd @C6 Of $4.00 par pound upa Subjact to 6scalatic63 for chmgu in labor sad citaaical COStS UhiCh hSV6 broU&#Xt th6 CUtTWd @C@ t0 $4.17. m C-t C@r68 June 30, i*l Ud6SS th6Cd$siOn o

297

Electric Reliability & Hurricane Preparedness Plan  

E-Print Network (OSTI)

plant that will improve reliability and stabilize fuel costs · Help meet future load growth and reserve;Mississippi Power Company · Headquartered - Gulfport · Subsidiary of Southern Company · Serves 23 counties Southeast Mississippi · 192,000 retail customers · Generating capacity: 3,166,192 kW · Plant Radcliffe

298

Wind turbine reliability database update.  

SciTech Connect

This report documents the status of the Sandia National Laboratories' Wind Plant Reliability Database. Included in this report are updates on the form and contents of the Database, which stems from a fivestep process of data partnerships, data definition and transfer, data formatting and normalization, analysis, and reporting. Selected observations are also reported.

Peters, Valerie A.; Hill, Roger Ray; Stinebaugh, Jennifer A.; Veers, Paul S.

2009-03-01T23:59:59.000Z

299

Photovoltaic performance and reliability workshop  

DOE Green Energy (OSTI)

This proceedings is the compilation of papers presented at the ninth PV Performance and Reliability Workshop held at the Sheraton Denver West Hotel on September 4--6, 1996. This years workshop included presentations from 25 speakers and had over 100 attendees. All of the presentations that were given are included in this proceedings. Topics of the papers included: defining service lifetime and developing models for PV module lifetime; examining and determining failure and degradation mechanisms in PV modules; combining IEEE/IEC/UL testing procedures; AC module performance and reliability testing; inverter reliability/qualification testing; standardization of utility interconnect requirements for PV systems; need activities to separate variables by testing individual components of PV systems (e.g. cells, modules, batteries, inverters,charge controllers) for individual reliability and then test them in actual system configurations; more results reported from field experience on modules, inverters, batteries, and charge controllers from field deployed PV systems; and system certification and standardized testing for stand-alone and grid-tied systems.

Kroposki, B.

1996-10-01T23:59:59.000Z

300

Exceptional situations and program reliability  

Science Conference Proceedings (OSTI)

It is difficult to write programs that behave correctly in the presence of run-time errors. Proper behavior in the face of exceptional situations is important to the reliability of long-running programs. Existing programming language features often provide ... Keywords: Error handling, compensating transactions, linear sagas, linear types, resource management

Westley Weimer; George C. Necula

2008-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Office of Electricity Delivery and Energy Reliability (OE) drives electric grid modernization and resiliency in the energy infrastructure while working to enable innovation across the energy sector, empowering American consumers, and securing our energy future. The OE mission and the leadership role OE plays in the energy industry directly support the President's effort to accelerate the transformation of America's energy system

302

Energy and Environment Directorate Status Report March 2006  

SciTech Connect

The Energy and Environment Directorate (E& ED) is one of 13 directorates at Lawrence Livermore National Laboratory (LLNL), which is operated by the University of California (UC) for the U.S. Department of Energy's National Nuclear Security Administration (NNSA). We operate in the context of a national security laboratory and focus on meeting major national needs, especially from a long-term perspective. In the LLNL context, E&ED is a hybrid ''program'' and ''discipline'' directorate, combining the program development responsibilities in the national energy and environment arenas to the benefit of the entire Laboratory and also serving as the Laboratory's science base of atmospheric, earth, environmental, and energy science. This Status Report is part of the annual evaluation process required by the Department of Energy (DOE) as part of its contract with UC. The annual review typically will focus on about one third of the activities and programs of a directorate, so that the entire organization is evaluated over a three-year window. This year's review is focused on the basic science foundations for the directorate and two major program areas in the directorate, with an update from a third program. The programs for review are: (1) Earth System Science and Engineering; (2) Nuclear Systems Science and Engineering; and (3) NARAC/IMAAC update. Major questions to be addressed during this review include: (1) Are the programmatic directions appropriate? How can they be improved? (2) What actions can E&ED take to ensure success? How well poised for success are the current staff and facilities? What additions are needed? (3) What recommendations can be made to the Director and the University? This Status Report provides background information on the entire directorate including the parts of the directorate that are the focus of this year's review by the Energy and Environment Directorate Review Committee, to be held March 6-9, 2006. The following sections describe the overall directorate structure, the Associate Director's vision for the future, structure and activities of the department and the four major programs, followed by appendices with information about publications, patents, and awards. An additional appendix provides information on the performance objectives used in the performance-based management system that is part of the UC contract to operate LLNL for DOE. The E&E Directorate contributes mainly to performance object 5, ''Enhance and nurture a strong science, engineering, and technology base in support of national security strategic objectives''. This appendix is included because information from the review committee's report may be included in the LLNL Science and Technology Office's annual report on how LLNL and its directorates meet the performance objectives. We anticipate that the science talks (mainly from the Center for Accelerator Mass Spectrometry) and the science poster session will help the committee assess the E&E Directorate's overall ability to support the scientific needs of LLNL.

Long, J S

2006-02-21T23:59:59.000Z

303

Defining Requirements for Improved Photovoltaic System Reliability  

DOE Green Energy (OSTI)

Reliable systems are an essential ingredient of any technology progressing toward commercial maturity and large-scale deployment. This paper defines reliability as meeting system fictional requirements, and then develops a framework to understand and quantify photovoltaic system reliability based on initial and ongoing costs and system value. The core elements necessary to achieve reliable PV systems are reviewed. These include appropriate system design, satisfactory component reliability, and proper installation and servicing. Reliability status, key issues, and present needs in system reliability are summarized for four application sectors.

Maish, A.B.

1998-12-21T23:59:59.000Z

304

Gearbox Reliability Collaborative Bearing Calibration  

DOE Green Energy (OSTI)

NREL has initiated the Gearbox Reliability Collaborative (GRC) to investigate the root cause of the low wind turbine gearbox reliability. The GRC follows a multi-pronged approach based on a collaborative of manufacturers, owners, researchers and consultants. The project combines analysis, field testing, dynamometer testing, condition monitoring, and the development and population of a gearbox failure database. At the core of the project are two 750kW gearboxes that have been redesigned and rebuilt so that they are representative of the multi-megawatt gearbox topology currently used in the industry. These gearboxes are heavily instrumented and are tested in the field and on the dynamometer. This report discusses the bearing calibrations of the gearboxes.

van Dam, J.

2011-10-01T23:59:59.000Z

305

Emerging Grid Reliability Improvement Technologies  

Science Conference Proceedings (OSTI)

The initial phase of a planned comprehensive Eastern Interconnection (EI) segmentation study is complete. As part of the preparations for completion of the EI study, and to carry out a similar effort for the Western Interconnection (WI), it was necessary to first investigate the potential of other technologies to compete with segmentation. This report discusses emerging grid reliability improvement technologies, providing a perspective on the pros and cons of segmentation, the grid shock absorber concept...

2007-10-29T23:59:59.000Z

306

NREL: Wind Research - Gearbox Reliability Collaborative  

NLE Websites -- All DOE Office Websites (Extended Search)

Research Research Search More Search Options Site Map Premature gearbox failures have a significant impact on the cost of wind farm operations. In 2007, NREL initiated the Gearbox Reliability Collaborative (GRC). The project combines analysis, field testing, dynamometer testing, condition monitoring, and the development and population of a gearbox failure database in a multi-pronged approach to determine why many wind turbine gearboxes do not achieve their expected design life-the time period that manufacturers expect them to last. Read about: The Gearbox Reliability Collaborative Gearbox Reliability Collaborative Projects Gearbox Reliability Collaborative Research and Development Working with the Gearbox Reliability Collaborative Gearbox Reliability Collaborative Publications

307

Reliability-Centered Maintenance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reliability-Centered Maintenance Reliability-Centered Maintenance Reliability-Centered Maintenance October 7, 2013 - 9:48am Addthis Reliability-centered maintenance leverages the same practices and technologies of predictive maintenance. The difference is that reliability-centered maintenance recognizes that: Equipment design and operations differ Different equipment has different probabilities of failure All equipment is not of equal importance to facility operations Facilities have limited financial and personnel resources. While reliability-centered maintenance relies on predictive maintenance practices and technologies, it also recognizes that maintenance on inexpensive and/or unimportant equipment may be better served by a reactive or predictive maintenance approach. Each of the aforementioned factors are

308

Deputy Director Biography | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Home » Deputy Director Biography Home » Deputy Director Biography Deputy Director for Resource Management Deputy Director Home Mission & Functions Deputy Director Biography Organization Contact Information Deputy Director for Resource Management U.S. Department of Energy SC-4/Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-9776 F: (202) 586-4120 E: sc.science@science.doe.gov Deputy Director Biography Print Text Size: A A A RSS Feeds FeedbackShare Page Dr. Jeffrey Salmon Deputy Director for Resource Management Office of Science U.S. Department of Energy Jeffrey Salmon became Deputy Director for Resource Management in July, 2008. He joined the Department of Energy in March 2001, as Senior Policy Advisor to the Secretary. In 2002, he joined the Office of Science as the

309

Mr. Walter Huber, Director Capital Improvements Division National Capital Region  

Office of Legacy Management (LM)

Walter Huber, Director Walter Huber, Director Capital Improvements Division National Capital Region 7th & D Streets, N.W. Washington, D.C. 20407 Dear Mr. Huber: As you may know, the Department of Energy (DOE) is evaluating the radiological condition of sites that were utilized under the Manhattan Engineer District (MED) and the Atomic Energy Commission (AEC) during the early years of nuclear development to determine whether they need remedial action and whether the Department has authority to perform such action. General Services Administration (GSA) was contacted through correspondence with Mr. John P. Allen, Project Director, Special Projects Division of GSA, that the former National Bureau of Standards (NBS) building on Van Ness Street was identified as one such site. This building was used by NBS

310

Energy Department's Data Director Named Presidential Innovation Fellow |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department's Data Director Named Presidential Innovation Department's Data Director Named Presidential Innovation Fellow Energy Department's Data Director Named Presidential Innovation Fellow August 23, 2012 - 5:14pm Addthis The Presidential Innovation Fellows being sworn in today. | Photo courtesy of the Office of Science and Technology Policy. The Presidential Innovation Fellows being sworn in today. | Photo courtesy of the Office of Science and Technology Policy. John Chu John Chu Communications Specialist with the Office of Energy Efficiency and Renewable Energy What does this project do? The Presidential Innovation Fellows program pairs top innovators from the private sector, non-profits, and academia with top innovators in government to collaborate on solutions that aim to deliver significant results in six months.

311

MEMORANDUM TO HEADS O F CONTRACTING ACTIVITIES AND PROCUREMENT DIRECTORS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2010 2010 MEMORANDUM TO HEADS O F CONTRACTING ACTIVITIES AND PROCUREMENT DIRECTORS FROM: DIRECTOR OFFICE OF CONTRACT MANAGEMENT SUBJECT: Establishment of Requirement for Monthly Status Reporting on Source Evaluation Boards (SEBs) Valued in Excess of $25 Million As everyone is aware, DOE accomplishes the majority of its work through its various contracts. In recent years, the Department has drawn increased scrutiny from a number of different sources. As a result, the procurement process receives a tremendous amount of visibility among senior DOE management, particularly our largest and most critical procurements which are conducted by SEBs. This highlights the critical need for SEB reporting and tracking. At the Procurement Directors meeting held in December 2009, it was mentioned during

312

Los Alamos National Laboratory names Jeffrey Mousseau Associate Director of  

NLE Websites -- All DOE Office Websites (Extended Search)

names names Jeffrey Mousseau Associate Director of Environmental Programs September 18, 2012 Will Oversee Transuranic Waste Disposal and Environmental Cleanup Projects LOS ALAMOS, N.M., September 18, 2012-Los Alamos National Laboratory today announced that Jeffrey Mousseau has been hired as the new associate director for Environmental Programs. Mousseau currently works as a senior project manager for the Laboratory's transuranic waste disposal program. In his new position, he will oversee this program as well as other key environmental cleanup and monitoring activities. - 2 - "Jeff shares my personal commitment to sustaining the current momentum of waste removal and cleanup that the Lab has steadily built over the past five years," said Laboratory Director Charlie McMillan. "His expertise in this area is outstanding, and will

313

MEMORANDUM FOR HEADS OF CONTRACTING ACTIVITY AND PROCUREMENT DIRECTORS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6,2010 6,2010 MEMORANDUM FOR HEADS OF CONTRACTING ACTIVITY AND PROCUREMENT DIRECTORS FROM: SUBJECT: PATRICK M. FERRARO ACTING DIRECTOR OFFICE OR PROCUREMEN ! f ASSISTANCE M JOSEPH WADDEL DIRECTOR r & OFFICE OF ACQU&ITION AND I SUPPLY MANAGEMENT (NA-63) NATIONAL NUCLEAR SECURITY ADMINISTRATION Acquisition Career Management Handbook Change 2010-03 Chapter 3 Federal Acquisition Certification in Contracting (FAC-C) Level II The purpose of this memorandum is t o announce ACMP Change 2010-03. This change amends the experience requirement for FAC-C Level II certification as currently stated in Chapter 3 o f the January 2009, revision of the Department's Acquisition Career Management Program Handbook (ref: Policy Flash 2009-17). In order for the Department of Energy (DOE) t

314

US Energy Secretary Samuel Bodman and Russian Atomic Energy Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US Energy Secretary Samuel Bodman and Russian Atomic Energy US Energy Secretary Samuel Bodman and Russian Atomic Energy Director Alexander Rumyantsev Discuss Bratislava Agreement US Energy Secretary Samuel Bodman and Russian Atomic Energy Director Alexander Rumyantsev Discuss Bratislava Agreement May 24, 2005 - 12:51pm Addthis US Energy Secretary Samuel Bodman (right) and Russian Atomic Energy Director Alexander Rumyantsev discuss progress in achieving the Bratislava Nuclear Security Initiatives in Moscow Tuesday, May 24, 2005. The Bratislava agreement was struck by Presidents Bush and Putin during their February 2005 meeting and includes initiatives to encourage US/Russia nuclear security cooperation, including enhancing an emergency response capability to deal with a nuclear or radiological incident, and sharing

315

Microgrids and Heterogeneous Security, Quality, Reliability, and Availability  

E-Print Network (OSTI)

and Energy Reliability, Distribution System Integrationand Energy Reliability, Distribution System Integration

Marnay, Chris

2007-01-01T23:59:59.000Z

316

NREL: News - NREL Names Santiago Grijalva Director for Power Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

013 013 NREL Names Santiago Grijalva Director for Power Systems Engineering July 1, 2013 Today, the Energy Department's National Renewable Energy Laboratory (NREL) announced a key hire to lead its Power Systems Engineering Center. Santiago Grijalva comes to NREL with both industry and academic experience, most recently from the Georgia Institute of Technology, where he held the position of Georgia Power Distinguished Professor and Strategic Energy Institute Associate Director for Electricity. As part of the Energy Systems Integration team at NREL, Dr. Grijalva will provide leadership to develop the strategic direction of the Power Systems Engineering Center, enhance technical capabilities and steward core competencies that advance electric power technologies. He will also lead

317

Automate feeders to improve reliability  

SciTech Connect

Pacific Gas and Electric Co. (PG and E) improved system reliability and saved money with an alarm and control system for substation distribution switches using remote control by standard telephone-communication links. The method is especially well suited for urban and suburban areas with independent telephone and power systems. The automated systems can also add capability to areas now limited by the emergency capability. The primary distribution alarm and control system has both a substation and a field switch element. Photographs accompanying the description help to explain how the controls work. 7 figures. (DCK)

1981-01-01T23:59:59.000Z

318

Real Time Grid Reliability Management 2005  

E-Print Network (OSTI)

transmission planning to evaluate future needs under different assumptions for resource availability,transmission operators depend on to ensure system reliability. The assumption of availabilitytransmission operators depend on to ensure system reliability. The assumption of traditional governor availability

Eto, Joe

2008-01-01T23:59:59.000Z

319

Definition: Regional Reliability Plan | Open Energy Information  

Open Energy Info (EERE)

reliability Coordinator References Glossary of Terms Used in Reliability Standards An i LikeLike UnlikeLike You like this.Sign Up to see what your friends like. nline...

320

Reliability Challenges for Solar Energy (Presentation)  

DOE Green Energy (OSTI)

Presentation that reviews reliability issues related to various types of photovoltaic tecnnologies, including crystalline silicon, thin films, and concentrating PV.

Kurtz, S.

2009-12-08T23:59:59.000Z

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Streamlined Reliability Centered Maintenance Analysis Application Update  

Science Conference Proceedings (OSTI)

A systematic evaluation of plant equipment and maintenance requirements using reliability centered maintenance (RCM) techniques can help hold down operating costs while maintaining plant availability and reliability. This report describes the application of streamlined reliability centered maintenance (streamlined RCM) methodology and software at four utilities.

2001-10-18T23:59:59.000Z

322

Mathematical Reliability Theory: From The Beginning to . . .  

E-Print Network (OSTI)

It is argued that the mathematical theory of reliability as a separate discipline began in 1961 with the publication of Multi-component systems and their structures and their reliability by Birnbaum, Esary and Saunders. Prior to this time, mathematicians were just applying standard mathematical techniques such as queueing theory, statistics and probability to engineering reliability problems. We

Richard E. Barlow

2002-01-01T23:59:59.000Z

323

Reliability Considerations from Integration of Smart Grid  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Considerations Considerations from the Integration of Smart Grid 116-390 Village Blvd., Princeton, NJ 08540 609.452.8060 | 609.452.9550 fax www.nerc.com the reliability of the to ensure bulk power system December 2010 (This page intentionally left blank) to ensure the reliability of the bulk power system Reliability Considerations of Integration of Smart Grid i

324

REQUEST FOR INDIRECT COST WAIVER I. Project Director  

E-Print Network (OSTI)

REQUEST FOR INDIRECT COST WAIVER I. Project Director: Department: Project Title: Project Sponsor without fully recovering the institutional indirect costs which will be incurred in conducting the project COSTS 1. FULL: OF I. A. C. 2. PARTIAL: OF H. B. K. TOTAL PROJECT COSTS L. INDIRECT COSTS TO BE WAIVED, J

Krovi, Venkat

325

Edward "Bruce" Held Director, Office of Intelligence and  

E-Print Network (OSTI)

to all investigative, counterintelligence, and counterterrorism activities within the areaCoy provided Staff Counterintelligence Officer (SCIO) support to Commander, U.S. Naval Forces Europe in London London, Connecticut (1991-99); and the NCISHQ Counterintelligence Directorate, Washington, D.C. (1999

326

Millard W. Hall, Director Volume 10, Number 4  

E-Print Network (OSTI)

following exposure to the stress. Water use efficiency in terms of grain produced per unit of water used may in 991 kg grain produced per k-liter water used, compared to 888 kg grain produced by unstressed controlsMillard W. Hall, Director Volume 10, Number 4 GUEST EDITORIAL State Water Planning Process

Nebraska-Lincoln, University of

327

Solar Energy Status and Perspectives Peter Ahm, Director  

E-Print Network (OSTI)

Solar Energy ­ Status and Perspectives Peter Ahm, Director PA Energy A/S (Ltd.) Snovdrupvej 16, DK-8340 Malling Phone: +45 86 93 33 33; Fax: +45 86 93 36 05; e-mail: ahm@paenergy.dk Abstract Solar energy in terms of thermal Solar Hot Water systems and electricity producing Photovoltaics contribute

328

SCIENCE FICTION, FANTASY, AND HORROR IN THE Program Directors  

E-Print Network (OSTI)

SCIENCE FICTION, FANTASY, AND HORROR IN THE ARTS Program Directors: Michael "Dusk" Peña ,,13 mpena in the Science Fiction, Fantasy, and Horror in the Arts Program! In the program we will be able to explore novels and films like never before, work on our writing skills and build our imagination. Participate in role

Hayden, Nancy J.

329

Ris International Energy Conference Jrgen Kjems, managing director  

E-Print Network (OSTI)

Risø International Energy Conference Jørgen Kjems, managing director #12;Risø National Laboratory is to promote value-generating and sustainable technological development within the areas of energy, industrial technologies within the areas of energy, manufacturing industry and biotechnology. · The efforts made shall

330

IN THIS REPORT 2 Message From the Director  

E-Print Network (OSTI)

#12;#12;IN THIS REPORT 2 Message From the Director 2 PNNL Overview 3 About this Report 3 and leadership of our staff on a broader scale within the community in which we work and live. PNNL has found (PNNL), we strive to achieve excellence in sustainability through our science and technology, management

331

Director's Protest Resolution Report Programmatic Land Use Plan  

E-Print Network (OSTI)

1 Director's Protest Resolution Report Programmatic Land Use Plan Amendments for Solar Energy......................................................................................... 68 #12;Reader How do The Dire excerpts Land Ma Report How do 1. F al 2. In n Issue T NEPA Issue N Organi Protest Issue E Rather renewab Summa There i Respon Specific decision 's Guide I read the R ector

Argonne National Laboratory

332

Chief Executive Officer Message 2 Scientific Director Message 4  

E-Print Network (OSTI)

: Biomedical and Life Sciences Intelligent Transport Systems Safety and Security Environmental Management#12;#12; Chief Executive Officer Message 2 Scientific Director Message 4 About NICTA 7 Success Stories 8 Strategic Focus Projects 16 Research Programs 20 Research Projects 36 Our Researchers 60 Young

Heiser, Gernot

333

The high wire balancing act of the IS project director  

Science Conference Proceedings (OSTI)

The implementation of a cross-functional enterprise system requires a more sustained and comprehensive change management program than does classical Information System (IS) application development. The tools and techniques used in such projects will ... Keywords: MIS development projects, case study, project directors, roles

Vital Roy; Carmen Bernier; Lucie Léveillé

2006-01-01T23:59:59.000Z

334

Prof. David Matthiesen, Ph.D. Faculty Director  

E-Print Network (OSTI)

products on the wind turbines please contact our Faculty Director, for more information. Vestas V27 225kW WT located at Sopko site NorthWind 100kW WT located on the CWRU campus #12;The WERC Center The WERC Phone: 216.368.1366 david.matthiesen@case.edu Wind Turbines as Research Instruments For our customer

Rollins, Andrew M.

335

Nancy Rader, Executive Director California Wind Energy Association  

E-Print Network (OSTI)

Nancy Rader, Executive Director California Wind Energy Association Improving Methods for Estimating Fatality of Birds and Bats at Wind Energy Facilities California Wind Energy Association Public Webinar Wind Energy Development 2008 CEC Research "Roadmap" on Impact Assessment Methods 2008 CEC PIER RFP 2009

336

Hidenori Kimura, D. Eng. Director, RIKEN BSI-TOYOTA Collaboration Center (BTCC)  

E-Print Network (OSTI)

Hidenori Kimura, D. Eng. Director, RIKEN BSI-TOYOTA Collaboration Center (BTCC) Unit Leader Control Systems Laboratory, RIKEN 2007- Director of the RIKEN BSI-Toyota Collaboration Center 2009

Fukai, Tomoki

337

Deputy Director Biography | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Deputy Director Biography Deputy Director Biography Deputy Director for Field Operations Deputy Director Home Mission & Functions Deputy Director Biography Organization Oversight Operations Improvement Committee Contact Information Deputy Director for Field Operations U.S. Department of Energy SC-3/Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5434 F: (202) 586-4120 E: sc.science@science.doe.gov Deputy Director Biography Print Text Size: A A A RSS Feeds FeedbackShare Page Joseph A. McBrearty Deputy Director for Field Operations Office of Science U.S. Department of Energy Joseph McBrearty joined the Office of Science in August 2010 immediately upon retiring from a 30-year career in the U.S. Navy, where he specialized in nuclear propulsion and nuclear weapons systems, training, control and

338

Deputy Director Biography | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Deputy Director Biography Deputy Director Biography Deputy Director for Science Programs Deputy Director Home Mission & Functions Deputy Director Biography Organization Staff Presentations & Testimony Federal Advisory Committees Committees of Visitors Contact Information Deputy Director for Science Programs U.S. Department of Energy SC-2/Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 F: (202) 586-4120 E: sc.science@science.doe.gov U.S. Department of Energy SC-2/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-5316 F: (301) 903-7780 E: sc.science@science.doe.gov Deputy Director Biography Print Text Size: A A A RSS Feeds FeedbackShare Page Dr. Patricia M. Dehmer Dr. Patricia M. Dehmer Dr. Patricia M. Dehmer Deputy Director for Science Programs

339

Definition: Reliability Coordinator Information System | Open Energy  

Open Energy Info (EERE)

Reliability Coordinator Information System Reliability Coordinator Information System Jump to: navigation, search Dictionary.png Reliability Coordinator Information System The system that Reliability Coordinators use to post messages and share operating information in real time.[1] Related Terms Reliability Coordinator References ↑ Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reliability_Coordinator_Information_System&oldid=480407" Categories: Definitions ISGAN Definitions What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load)

340

A Reliable Natural Language Interface  

E-Print Network (OSTI)

As household appliances grow in complexity and sophistication, they become harder and harder to use, particularly because of their tiny display screens and limited keyboards. This paper describes a strategy for building natural language interfaces to appliances that circumvents these problems. Our approach leverages decades of research on planning and natural language interfaces to databases by reducing the appliance problem to the database problem; the reduction provably maintains desirable properties of the database interface. The paper goes on to describe the implementation and evaluation of the EXACT interface to appliances, which is based on this reduction. EXACT maps each English user request to an SQL query, which is transformed to create a PDDL goal, and uses the Blackbox planner [13] to map the planning problem to a sequence of appliance commands that satisfy the original request. Both theoretical arguments and experimental evaluation show that EXACT is highly reliable.

To Household Appliances; Alexander Yates

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Department Chair/Equivalent Unit Director Mid-appointment Review Cover Sheet  

E-Print Network (OSTI)

Department Chair/Equivalent Unit Director Mid-appointment Review Cover Sheet The review committee:______________________________________________________________________________ 1. A copy of the committee report has been given to the department chair/equivalent unit director. 2. The committee has discussed its report with the department chair/ equivalent unit director. 3. A copy

342

Market Manual 11: Reliability Compliance Part 11.3: Reliability  

E-Print Network (OSTI)

A catalogue of the information that is to be shared between the IESO and Market Participants in relation to maintaining the reliability of the IESO-controlled grid Public Disclaimer The posting of documents on this Web site is done for the convenience of market participants and other interested visitors to the IESO Web site. Please be advised that, while the IESO attempts to have all posted documents conform to the original, changes can result from the original, including changes resulting from the programs used to format the documents for posting on the Web site as well as from the programs used by the viewer to download and read the documents. The IESO makes no representation or warranty, express or implied, that the documents on this Web site are exact reproductions of the original documents listed. In addition, the documents and information posted on this Web site are subject to change. The IESO may revise, withdraw or make final these materials at any time at its sole discretion without further notice. It is solely your responsibility to ensure that you are using up-to-date documents and information. This document may contain a summary of a particular market rule. Where provided, the summary has

Information Catalogue

2013-01-01T23:59:59.000Z

343

Testimony of Dr. Willie E. May Associate Director of Laboratory ...  

Science Conference Proceedings (OSTI)

... wide network that uses information technology to deliver electricity efficiently, reliably ... turbine blades, railroad rails, and shock absorbers in order to ...

2013-06-14T23:59:59.000Z

344

1 Testimony of Dr. Richard R. Cavanagh Director Office of ...  

Science Conference Proceedings (OSTI)

... Previous collaborations with NIST and the US Army Dugway (Utah) Proving Ground have developed reliable methods based on DNA analysis to ...

2013-06-14T23:59:59.000Z

345

Managing Reliability in the 21st Century  

SciTech Connect

The rapid pace of change at Ike end of the 20th Century should continue unabated well into the 21st Century. The driver will be the marketplace imperative of "faster, better, cheaper." This imperative has already stimulated a revolution-in-engineering in design and manufacturing. In contrast, to date, reliability engineering has not undergone a similar level of change. It is critical that we implement a corresponding revolution-in-reliability-engineering as we enter the new millennium. If we are still using 20th Century reliability approaches in the 21st Century, then reliability issues will be the limiting factor in faster, better, and cheaper. At the heart of this reliability revolution will be a science-based approach to reliability engineering. Science-based reliability will enable building-in reliability, application-specific products, virtual qualification, and predictive maintenance. The purpose of this paper is to stimulate a dialogue on the future of reliability engineering. We will try to gaze into the crystal ball and predict some key issues that will drive reliability programs in the new millennium. In the 21st Century, we will demand more of our reliability programs. We will need the ability to make accurate reliability predictions that will enable optimizing cost, performance and time-to-market to meet the needs of every market segment. We will require that all of these new capabilities be in place prior to the stint of a product development cycle. The management of reliability programs will be driven by quantifiable metrics of value added to the organization business objectives.

Dellin, T.A.

1998-11-23T23:59:59.000Z

346

Microgrids and Heterogeneous Security, Quality, Reliability, and Availability  

E-Print Network (OSTI)

quality, reliability, and availability,” IEEE Power & EnergyReliability, and Availability Chris Marnay EnvironmentalQuality, Reliability, and Availability C. Marnay Ernest

Marnay, Chris

2007-01-01T23:59:59.000Z

347

CERTS 2012 Program Review - Automatic Reliability Reports (ARR...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

prototype at MISO: Architecture, Grid Monitoring Visualization and Grid Reliability Tracking Grid Automatic Reliability Report (GARR) Page 1 Automatic Reliability Reports (ARR)...

348

Global Nuclear Energy Partnership Fact Sheet - Establish Reliable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Establish Reliable Fuel Services Global Nuclear Energy Partnership Fact Sheet - Establish Reliable Fuel Services GNEP would build and strengthen a reliable international fuel...

349

Electricity Delivery and Energy Reliability | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electricity Delivery and Energy Reliability Electricity Delivery and Energy Reliability information about the delivery of electricity and energy reliability Electricity Delivery...

350

Fatigue reliability of wind turbine components  

DOE Green Energy (OSTI)

Fatigue life estimates for wind turbine components can be extremely variable due to both inherently random and uncertain parameters. A structural reliability analysis is used to qualify the probability that the fatigue life will fall short of a selected target. Reliability analysis also produces measures of the relative importance of the various sources of uncertainty and the sensitivity of the reliability to each input parameter. The process of obtaining reliability estimates is briefly outlined. An example fatigue reliability calculation for a blade joint is formulated; reliability estimates, importance factors, and sensitivities are produced. Guidance in selecting distribution functions for the random variables used to model the random and uncertain parameters is also provided. 5 refs., 9 figs., 1 tab.

Veers, P.S.

1990-01-01T23:59:59.000Z

351

Letter Clarifying the Position of the Director of the Virginia Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Clarifying the Position of the Director of the Virginia Clarifying the Position of the Director of the Virginia Department of Environmental Quality Regarding the District of Columbia Public Service Commission's ("DC PSC") Emergency Petition Letter Clarifying the Position of the Director of the Virginia Department of Environmental Quality Regarding the District of Columbia Public Service Commission's ("DC PSC") Emergency Petition Docket No. EO-05-01: During the course of participating in the above-captioned Department of Energy ("DOE") docket, Robert G. Burnley, Director of the Virginia Department of Environmental Quality ("Director"), has filed two pleadings regarding the District of Columbia Public Service Commission's ("DC PSC") Emergency Petition. After initial uncertainty

352

design and reliability of solder interconnections  

Science Conference Proceedings (OSTI)

X. Wu, K. Hu, X. Dou, G. Mui, C.-P. Yeh and K. Wyatt. Combined ... Reliability Considerations When Choosing Water Soluble Flux for Electronic Assembly [pp.

353

Office of Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments of Cisco Systems to Office of Electricity Delivery and Energy Reliability Department of Energy in Response to Request for Information: Addressing Policy and Logistical...

354

CMOS Reliability and Advanced Devices Group  

Science Conference Proceedings (OSTI)

... electron devices for the electronics industry by ... reliability issues in emerging electronic devices. ... Power Device and Thermal Metrology—The Power ...

2013-04-26T23:59:59.000Z

355

Improving Wind Turbine Gearbox Reliability: Preprint  

DOE Green Energy (OSTI)

This paper describes a new research and development initiative to improve gearbox reliability in wind turbines begun at the National Renewable Energy Laboratory (NREL) in Golden, Colorado, USA.

Musial, W.; Butterfield, S.; McNiff, B.

2007-06-01T23:59:59.000Z

356

Mechanical Reliability Study on Porous Brittle Materials  

Science Conference Proceedings (OSTI)

Presentation Title, Mechanical Reliability Study on Porous Brittle Materials. Author(s), Xiaofeng Fan, Eldon D Case, Fei Ren, Yutian Shu, Melissa J Baumann .

357

Definition: Transmission Reliability | Open Energy Information  

Open Energy Info (EERE)

to ensure reliable system operation as system conditions change.1 Related Terms transmission lines, transfer capability, system, transmission line References Glossary...

358

Real Time Grid Reliability Management 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

period, the traditional approach to reliability management - construction of new transmission lines - has not been pursued due to unresolved issues related to the...

359

Information Concerning Reliability Impacts under Various System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations of the Mirant...

360

Substation reliability -- Practical application and system approach  

SciTech Connect

Practical application of reliability analysis was made for the comparison of alternate line and bus arrangements of a future transmission substation with potential savings of up to $3.6 M. The paper describes how both the substation and the power system were simulated by using computer programs STAREL and COMREL. It presents the method used to obtain the most accurate estimates for the outage data of the system components. Finally, it expresses the results with simple reliability indices which can be meaningful for management. The results of the study show the need to include the reliability of the transmission system in a substation reliability evaluation.

Save, P. [Southern California Edison Co., Rosemead, CA (United States)

1995-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Reliability evaluation of smart distribution grids.  

E-Print Network (OSTI)

??The term "Smart Grid" generally refers to a power grid equipped with the advanced technologies dedicated for purposes such as reliability improvement, ease of control… (more)

Kazemi, Shahram

2011-01-01T23:59:59.000Z

362

Dr. Wm. E. Mott, Director Environmental 8 Safety Eng. Div.  

Office of Legacy Management (LM)

Wm. E. Mott, Director Wm. E. Mott, Director Environmental 8 Safety Eng. Div. 0f.f ice of Environment (EU- 14) Dept. of Energy Washington, DC 20545 Dear Dr. Mott: MED Warehousing Location The sites listed in your letter of Febru; to determine present utilization and ownershi] the information available at this time: 1. Utica Street Warehouse 240 W. Utica Street Buffalo, ?pI The area of 240 and 242 W. Utica St, drive to a 4-story parking garage for Ch The ramp is about 4 years old and previol there was a paved parking lot on the sit 1960' s. The warehouse structure was denI unknown previous date. 2. West Genesee Street Warehouse Buffalo, NY The W. Genesee area is currently abc in .length. About half of the streets prc eliminated to make way for the Niagara E: the remaining streets there is one old bl

363

Orientation Waves in a Director Field With Rotational Inertia  

E-Print Network (OSTI)

We study the propagation of orientation waves in a director field with rotational inertia and potential energy given by the Oseen-Frank energy functional from the continuum theory of nematic liquid crystals. There are two types of waves, which we call splay and twist waves. Weakly nonlinear splay waves are described by the quadratically nonlinear Hunter-Saxton equation. Here, we show that weakly nonlinear twist waves are described by a new cubically nonlinear, completely integrable asymptotic equation. This equation provides a surprising representation of the Hunter-Saxton equation as an advection equation. There is an analogous representation of the Camassa-Holm equation. We use the asymptotic equation to analyze a one-dimensional initial value problem for the director-field equations with twist-wave initial data.

Giuseppe Ali; John K. Hunter

2006-09-07T23:59:59.000Z

364

Photon Sciences Directorate | 2010 Annual Report | DISCOVERY at Light Speed  

NLE Websites -- All DOE Office Websites (Extended Search)

The Quick Pace of Construction The Quick Pace of Construction Steve Dierker "We are ahead of schedule and within budget on construction of the basic buildings and utilities for NSLS-II. Teamwork is key to our success." - Martin Fallier Director, Facilities Division Compare the pictures taken October 2009 and September 2010 (below). They show the remarkable progress made this year on NSLS-II construction, evidence of the hard work of everyone involved - from Photon Sciences staff to construction workers on the site. The Facilities Division, responsible for the design and construction of conventional facilities within the Photon Sciences Directorate, is necessarily focused on NSLS-II. With a budget of $912 million and an official completion date of 2015, NSLS-II is the largest domestic capital

365

Fermilab | Tune IT Up | Message from the Director  

NLE Websites -- All DOE Office Websites (Extended Search)

Director Director Pier Oddone Pier Oddone A DOE cybersecurity audit last week found very serious shortcomings in how we are managing our computers at Fermilab. Among other problems, the review team found unlocked doors leading to open computers on employees' desks, easy access to system administrators' accounts, passwords openly displayed and failure to respond quickly to virus alerts. Overall, we received a cybersecurity grade of "marginal." The world-class science at our laboratory requires world-class management of our computing resources. Moreover, we must do this within the context of the cybersecurity requirements of the federal government, including DOE, which provides those resources. As the audit showed us, addressing these findings will require a culture change at Fermilab. At a laboratory where

366

Photon Sciences Directorate | 2010 Annual Report | EHS Group Expands  

NLE Websites -- All DOE Office Websites (Extended Search)

Photon Sciences EHS Group Expands, Photon Sciences EHS Group Expands, Evolves in 2010 Steve Hoey "We're proud of the excellent safety record we earned in 2010. It would not have been possible without the hard work, dedication, and experience of the EHS staff and the continuing efforts of our contractors to work more safely." - Steve Hoey Manager, Environment, Safety and Health Fiscal year 2010 was busy for Environment, Safety, and Health (ESH) staff in the Photon Sciences Directorate, due in no small part to the year-long strategic planning leading up to the reorganization of the directorate at year's end and the continuing rapid growth of NSLS-II. Photon Sciences ESH already has an excellent safety record under its belt. In 2010, as was the case with the Laboratory as a whole, a strong emphasis

367

Response to Director's Review of Fermilab Project Management Improvement Initiatives  

NLE Websites -- All DOE Office Websites (Extended Search)

Response to Director's Review of Fermilab Project Management Improvement Initiatives Response to Director's Review of Fermilab Project Management Improvement Initiatives May 14, 2013 Executive Summary Fermilab is entering a new, transitional era defined by the transformation from operating a very large experimental facility over several decades to managing and delivering a portfolio of new projects within technical performance, budget and schedule expectations. Throughout CY12, internal and external reviews identified some systemic weaknesses in execution of some construction activities and fabrication of components, including procurement planning and execution, cost estimating, and internal project communication. These Project Management System concerns have the potential to impact other projects and operational activities at the Laboratory if not addressed. Coincident with the

368

A MESSAGE FROM THE ACTING DIRECTOR OF THE U  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MESSAGE FROM THE DIRECTOR OF THE MESSAGE FROM THE DIRECTOR OF THE U.S. OFFICE OF PERSONNEL MANAGEMENT I am pleased to submit the annual Federal Equal Opportunity Recruitment Program (FEORP) Report for fiscal year (FY) 2010 to Congress. Prepared in accordance with the requirements of title 5, United States Code, section 7201, this report provides statistical data on employment in the Federal workforce (FW) and highlights some human capital practices Federal agencies are using to recruit, develop, and retain talent. Findings for FY 2010 The Federal workforce is 17.7 percent Black, 8.0 percent Hispanic, 5.6 percent Asian/Pacific Islander, 1.8 percent Native American, 0.7 percent non-Hispanic/Multi-racial, and 66.2 percent White. Minorities as a whole constituted 33.8 percent of the FW. Men comprised 56.1 percent

369

Director at Sandia National Laboratories | National Nuclear Security  

National Nuclear Security Administration (NNSA)

at Sandia National Laboratories | National Nuclear Security at Sandia National Laboratories | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Who We Are > In The Spotlight > Sidney Gutierrez Director at Sandia National Laboratories Sidney Gutierrez Sidney Gutierrez Role: Director at Sandia National Laboratories Award: 2010 Notable New Mexican

370

T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Blue Coat Director HTTP Trace Processing Flaw Permits 0: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks T-720: Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks September 19, 2011 - 8:45am Addthis PROBLEM Blue Coat Director HTTP Trace Processing Flaw Permits Cross-Site Scripting Attacks. PLATFORM: All versions of Director prior to 5.5.2.3 are vulnerable. ABSTRACT: A vulnerability was reported in Blue Coat Director. A remote user can conduct cross-site scripting attacks. reference LINKS: Blue Coat Advisories ID: SA62 SecurityTracker Alert ID: 1026061 Blue Coat Director 510 Blue Coat SGME 5 IMPACT ASSESSMENT: Medium Discussion: An attacker can use the HTTP TRACE method to echo malicious script back to the client as part of a Cross Site Scripting (XSS) attack. No

371

Certified Federal Project Directors | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

Certified Federal Project Directors Certified Federal Project Directors Project Assessment (OPA) OPA Home About Project Management SC Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors FPD Leadership Skills .pdf file (29KB) SC FPD 360° Mentoring Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: sc.opa@science.doe.gov SC Federal Project Directors (FPD) and FPD Resources Certified Federal Project Directors Print Text Size: A A A RSS Feeds FeedbackShare Page Site Federal Project Director Level Certified Project Contact Information Ames Site Office (AMSO) Cynthia Baebler 1 630-252-1563 cynthia.baebler@ch.doe.gov Argonne Site Office (ASO) Dale Dietzel 1 630-252-2555 dale.dietzel@ch.doe.gov

372

NREL: Gearbox Reliability Collaborative - Working with the Gearbox...  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Deployment Energy Systems Integration Gearbox Reliability Collaborative Wind Research Wind Gearbox Reliability Collaborative Search More Search Options Site Map...

373

NREL's Gearbox Reliability Collaborative leads to wind turbine gearbox reliability, lowering the cost of energy.  

E-Print Network (OSTI)

NREL's Gearbox Reliability Collaborative leads to wind turbine gearbox reliability, lowering have been able to identify shortcomings in the design, testing, and operation of wind turbines findings are quickly shared among GRC participants, including many wind turbine manufacturers and equipment

374

Exact bounds for average pairwise network reliability  

Science Conference Proceedings (OSTI)

Several methods for finding exact bounds of average pairwise network connectivity (APNC) are proposed. These methods allows faster decision making about if a network is reliable for its purpose. Previous results on cumulitive updating of all-terminal ... Keywords: algorithm, network reliability, pairwise connectivity

Alexey Rodionov; Olga Rodionova

2013-01-01T23:59:59.000Z

375

Engineering Reliability into Web Sites: Google SRE  

E-Print Network (OSTI)

Engineering Reliability into Web Sites: Google SRE Alex Perry alex.perry@google.com Santa Monica SRE, Google #12;Abstract This talk introduces Site Reliability Engineering (SRE) at Google, explaining, Santa Monica, Dublin and Kirkland manage Google's many services and websites. They draw upon the Linux

Cortes, Corinna

376

Ris-R-1235(EN) Reliability Databases  

E-Print Network (OSTI)

.4 Standard models of reliability MIL-HDBK-217 MIL-HDBK-217 was the original standard for reliability-wide. The most recent revision of MIL-HDBK- 217 is Revision F Notice 2, which was released in February of 1995. MIL-HDBK-217 includes the ability to perform a 'parts count' analysis or a 'part stress' analysis

377

Exploratory Reliability and Performance R&D  

DOE Green Energy (OSTI)

This paper presents a brief overview of the status and accomplishments during fiscal year (FY) 2005 of the Photovoltaic (PV) Exploratory Reliability and Performance R&D Subtask, which is part of the PV Module Reliability R&D Project (a joint NREL-Sandia project).

Osterwald, C. R.

2005-11-01T23:59:59.000Z

378

Reliability mathematics analysis on traction substation operation  

Science Conference Proceedings (OSTI)

In electrified railway traction power supply systems, the operational qualities and reliabilities of the main traction transformer loop is higher, but ones of bus output units is comparatively low. The traction transformer loop still works when output ... Keywords: Erlang distribution, Markov theory, life, reliability, traction substation, transformer

Hongsheng Su

2008-11-01T23:59:59.000Z

379

Inventing the future of reliability: FERC's recent orders and the consolidation of reliability authority  

Science Conference Proceedings (OSTI)

The Energy Policy Act of 2005 established mandatory reliability standard enforcement under a system in which the Federal Energy Regulatory Commission and the Electric Reliability Organization would have their own spheres of responsibility and authority. Recent orders, however, reflect the Commission's frustration with the reliability standard drafting process and suggest that the Electric Reliability Organization's discretion is likely to receive less deference in the future. (author)

Skees, J. Daniel

2010-06-15T23:59:59.000Z

380

Reliability First Corporation | OpenEI  

Open Energy Info (EERE)

Reliability First Corporation Reliability First Corporation Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 110, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO EIA Gateway Reliability First Corporation SERC Reliability Corporation Data application/vnd.ms-excel icon AEO2011:Renewable Energy Generation by Fuel - SERC Reliability Corporation / Gateway- Reference Case (xls, 118.9 KiB) Quality Metrics Level of Review Peer Reviewed

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Definition: Reliability Coordinator Area | Open Energy Information  

Open Energy Info (EERE)

Coordinator Area Coordinator Area Jump to: navigation, search Dictionary.png Reliability Coordinator Area The collection of generation, transmission, and loads within the boundaries of the Reliability Coordinator. Its boundary coincides with one or more Balancing Authority Areas.[1] Related Terms transmission lines, Reliability Coordinator, Balancing Authority Area, transmission line, balancing authority, smart grid References ↑ Glossary of Terms Used in Reliability Standards An inlin LikeLike UnlikeLike You like this.Sign Up to see what your friends like. e Glossary Definition Retrieved from "http://en.openei.org/w/index.php?title=Definition:Reliability_Coordinator_Area&oldid=502626" Categories: Definitions ISGAN Definitions What links here Related changes Special pages

382

Information Concerning Reliability Impacts under Various System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Concerning Reliability Impacts under Various System Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Docket No. EO-05-01: PJM Interconnection, L.L.C. and PEPCO Holdings, Inc. is hereby providing you with additional information concerning reliability impacts under various system conditions associated with the unavailability of the Potomac River Generating Station to serve load in the D.C. area. Also enclosed as part of this submittal is material provided by PEPCO (balance of sentence redacted) In addition, there is a discussion concerning the impacts of demand side response in addressing this situation. Information Concerning Reliability Impacts under Various System

383

Reliability and Functional Availability of HVAC Systems  

E-Print Network (OSTI)

This paper presents a model to calculate the reliability and availability of heating, ventilation and air conditioning systems. The reliability is expressed in the terms of reliability, maintainability and decision capability. These terms are a function of the mean time between failure, mean time to repair and decision time. The availability is expressed as an operational and functional availability of the systems. These terms are a function of both the technical and human characteristics to maintain the systems in correct operational state. The result is based on a large amount data from operational organisations, the compulsory inspection of ventilation systems and momentary and continuous measurements made in HVAC-systems.

Myrefelt, S.

2004-01-01T23:59:59.000Z

384

Fermilab | Directorate | Office of Integrated Planning & Performance  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Integrated Planning & Performance Management (IPPM) Office of Integrated Planning & Performance Management (IPPM) Integrated Planning Diagram Integrated Planning Diagram [Download PPT] Mission: The Office of Integrated Planning and Performance Management (IPPM) within the Fermilab Directorate provides systems and management processes for institutional planning and performance assessment and evaluation. The office of IPPM leads multi-year, forward-looking planning and integration of institutional plans, programs, projects, operations and budgets. In addition it develops, implements and maintains integrated laboratory systems and management processes for strategic planning and goal setting, project and program oversight, enterprise risk management and performance planning and oversight. IPPM Facilitates:

385

Tribal Leader Forum Kathy Ahsing Director, Planning and Development  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary of the Army (Installations, Energy & Environment) Secretary of the Army (Installations, Energy & Environment) Tribal Leader Forum Kathy Ahsing Director, Planning and Development 31 May 2013 Assistant Secretary of the Army (Installations, Energy & Environment) * Today's military installations are playing an ever increasing role in energy security. - Installations are also playing an increased role in disaster and other community relief efforts Army Installations' Changing Roles * Installations are increasingly susceptible to a fragile electrical grid. - Many Army installations are at the end of the distribution line, further increasing their exposure 2 UNCLASSIFIED Assistant Secretary of the Army (Installations, Energy & Environment)

386

SERC Reliability Corporation | OpenEI  

Open Energy Info (EERE)

SERC Reliability Corporation SERC Reliability Corporation Dataset Summary Description This dataset comes from the Energy Information Administration (EIA), and is part of the 2011 Annual Energy Outlook Report (AEO2011). This dataset is table 113, and contains only the reference case. The dataset uses gigawatts, billion kilowatthours and quadrillion Btu. The data is broken down into generating capacity, electricity generation and energy consumption. Source EIA Date Released April 26th, 2011 (3 years ago) Date Updated Unknown Keywords 2011 AEO Carolina EIA Renewable Energy Generation SERC Reliability Corporation Virginia Data application/vnd.ms-excel icon AEO2011: Renewable Energy Generation by Fuel - SERC Reliability Corporation / Virginia-Carolina- Reference Case (xls, 118.9 KiB) Quality Metrics

387

Reliability Assessment of North American Steam Turbines  

Science Conference Proceedings (OSTI)

This survey provides statistics related to the reliability and maintenance of fossil-fueled steam turbines in the continental United States. The analysis focuses primarily on active turbines larger than 200 MW.

2002-04-24T23:59:59.000Z

388

Definition: Regional Reliability Organization | Open Energy Informatio...  

Open Energy Info (EERE)

Terms Bulk Electric System References Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up to see what your friends like. inline...

389

System Software Reliability, 1st edition  

Science Conference Proceedings (OSTI)

Computer software reliability has never been so important. Computers are used in areas as diverse as air traffic control, nuclear reactors, real-time military, industrial process control, security system control, biometric scan-systems, automotive, mechanical ...

H. Pham

2010-12-01T23:59:59.000Z

390

PV Module Reliability Research (Fact Sheet)  

DOE Green Energy (OSTI)

This National Center for Photovoltaics sheet describes the capabilities of its PV module reliability research. The scope and core competencies and capabilities are discussed and recent publications are listed.

Not Available

2013-06-01T23:59:59.000Z

391

Definition: Adverse Reliability Impact | Open Energy Information  

Open Energy Info (EERE)

a widespread area of the Interconnection.1 Related Terms smart grid References Glossary of Terms Used in Reliability Standards An LikeLike UnlikeLike You like this.Sign Up...

392

Definition: Interconnection Reliability Operating Limit | Open...  

Open Energy Info (EERE)

Terms System Operating Limit, System, Cascading Outage, smart grid References Glossary of Terms Used in Reliability Standards An inl LikeLike UnlikeLike You like this.Sign...

393

Reliability Issues for Photovoltaic Modules (Presentation)  

DOE Green Energy (OSTI)

Si modules good in field; new designs need reliability testing. CdTe & CIGS modules sensitive to moisture; carefully seal. CPV in product development stage; benefits from expertise in other industries.

Kurtz, S.

2009-10-01T23:59:59.000Z

394

Demand Response For Power System Reliability: FAQ  

SciTech Connect

Demand response is the most underutilized power system reliability resource in North America. Technological advances now make it possible to tap this resource to both reduce costs and improve. Misconceptions concerning response capabilities tend to force loads to provide responses that they are less able to provide and often prohibit them from providing the most valuable reliability services. Fortunately this is beginning to change with some ISOs making more extensive use of load response. This report is structured as a series of short questions and answers that address load response capabilities and power system reliability needs. Its objective is to further the use of responsive load as a bulk power system reliability resource in providing the fastest and most valuable ancillary services.

Kirby, Brendan J [ORNL

2006-12-01T23:59:59.000Z

395

Reliability Challenges for Solar Energy (Presentation)  

DOE Green Energy (OSTI)

PV industry can benefit from reliability testing experience of microelectronics industry . Si modules perform well in field; CdTe/CIGS must be sealed to moisture; CPV in product development stage.

Kurtz, S.

2009-04-27T23:59:59.000Z

396

Photovoltaic Reliability and Engineering (Revised) (Fact Sheet)  

DOE Green Energy (OSTI)

Capabilities fact sheet for the National Center for Photovoltaics: Photovoltaic Reliability and Engineering. One-sided sheet that includes Scope, Core Competencies and Capabilities, and Contact/Web information.

Not Available

2011-06-01T23:59:59.000Z

397

Definition: Reliability Coordinator | Open Energy Information  

Open Energy Info (EERE)

Coordinator Coordinator Jump to: navigation, search Dictionary.png Reliability Coordinator The entity that is the highest level of authority who is responsible for the reliable operation of the Bulk Electric System, has the Wide Area view of the Bulk Electric System, and has the operating tools, processes and procedures, including the authority to prevent or mitigate emergency operating situations in both nextday analysis and real-time operations. The Reliability Coordinator has the purview that is broad enough to enable the calculation of Interconnection Reliability Operating Limits, which may be based on the operating parameters of transmission systems beyond any Transmission Operator's vision.[1] Related Terms transmission lines, Bulk Electric System, transmission line

398

Gearbox Reliability Collaborative (GRC) Description and Loading  

SciTech Connect

This document describes simulated turbine load cases in accordance to the IEC 61400-1 Ed.3 standard, which is representative of the typical wind turbine design process. The information presented herein is intended to provide a broad understanding of the gearbox reliability collaborative 750kW drivetrain and turbine configuration. In addition, fatigue and ultimate strength drivetrain loads resulting from simulations are presented. This information provides the bases for the analytical work of the gearbox reliability collaborative effort.

Oyague, F.

2011-11-01T23:59:59.000Z

399

Reliability Assessment of SMART Reactor Protection System  

Science Conference Proceedings (OSTI)

Component failure rates and integrated system reliability of the SMART reactor protection system were analyzed. The analysis tool of the study was the RELEX 7 computer program developed by Relex Software Corporation. The RELEX software is a PC based computer program which includes the part stress analysis models and the RBD analysis model to calculate component and system reliability. The component failure rate data for the study was selected from the MIL-HDBK-217F. (authors)

Won Young, Yun; Choong Heui, Jeong [Korea Institute of Nuclear Safety, P. O. Box 114, Yusong Post Office, Daejeon (Korea, Republic of); Seong Hun, Kim; Sang Yong, Lee [Sam Chang Enterprise Co. LTD, 974-1, Goyen-ri, Woongchon-myon, Ulju-gun, Ulsan (Korea, Republic of)

2006-07-01T23:59:59.000Z

400

EPRI Distribution Reliability Practices Repository V2  

Science Conference Proceedings (OSTI)

A key objective of EPRI's research into distribution reliability practices is to identify, document and provide practice summary descriptions to research participants in a format that facilitates comparison and aids decision-makers in identifying those practices in place at other utilities which can be applied to their utility to improve performance. This research report presents distribution reliability practice results from six different companies in a repository which places ...

2013-11-27T23:59:59.000Z

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Gene Brooks and His Contributions to the American Choral Directors Association.  

E-Print Network (OSTI)

?? In his thirty years as Executive Director of ACDA, Dr. Gene Brooks has demonstrated his passion for choral music through his work in the… (more)

Zamer, Craig

2007-01-01T23:59:59.000Z

402

Message from the Division Director | U.S. DOE Office of Science...  

Office of Science (SC) Website

the Division Director Organization Chart .pdf file (82KB) Phone Listing .pdf file (129KB) SC Categorical Exclusions and NEPA Documents SLI & SS Budget Contact Information Safety,...

403

Sandia director honors R&D 100 awardees | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

director honors R&D 100 awardees | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

404

Dr. George Arnold to Take on New Role as Director of the ...  

Science Conference Proceedings (OSTI)

... Contact: Cuong Nguyen (301) 975-2254. Dear Colleagues,. I am excited to share this news with you. NIST Director Pat Gallagher ...

2013-04-01T23:59:59.000Z

405

Dr. Warren M. Heffington, Director, Texas A&M University Industrial...  

NLE Websites -- All DOE Office Websites (Extended Search)

INDUSTRIAL TECHNOLOGIES PROGRAM Dr. Warren M. Heffington, Director, Texas A&M University Industrial Assessment Center On the eve of his retirement, after 25 years of distinguished...

406

Electric Power Reliability in Chemical Plants  

E-Print Network (OSTI)

The quality and reliability of utility-generated electric power is presently receiving a great deal of attention from the chemical and refining industry. What changes have taken place to make electric power reliability a major topic of discussion at plants across the country? Has the quality and reliability of utility-generated power deteriorated over the past five or ten years? Or, has the perception of what constitutes reliable power changed with the advent, installation, and increasing usage of microprocessor-based equipment and controllers? The differing views held by both parties tend to make their relationship adversarial. Both parties have problems with their individuals views and the associated monetary costs, which can be either a loss or a gain. Improved reliability for the chemical plant means less "off spec" product, thereby resulting in more product to sell. Improved reliability for the utility means less customer downtime, thereby resulting in more KWH sales and a higher capacity factor. The biggest limiting factor to solving the actual problems is the dollar cost associated with that solution. Each solution must have a payback period that meets the economic criteria for return on investment for either the industry or the utility.

Cross, M. B.

1989-09-01T23:59:59.000Z

407

Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g  

E-Print Network (OSTI)

EE552 Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g September 27, 2010 #12;Reliability Planning OverviewReliability Planning Overview · Midwest ISO Transmission Expansion Plan (MTEP)p ( ) · MTEP Reliability Study Process ­ Planning Criteriag ­ Reliability Analysis

McCalley, James D.

408

Measurement Practices for Reliability and Power Quality  

DOE Green Energy (OSTI)

This report provides a distribution reliability measurement ''toolkit'' that is intended to be an asset to regulators, utilities and power users. The metrics and standards discussed range from simple reliability, to power quality, to the new blend of reliability and power quality analysis that is now developing. This report was sponsored by the Office of Electric Transmission and Distribution, U.S. Department of Energy (DOE). Inconsistencies presently exist in commonly agreed-upon practices for measuring the reliability of the distribution systems. However, efforts are being made by a number of organizations to develop solutions. In addition, there is growing interest in methods or standards for measuring power quality, and in defining power quality levels that are acceptable to various industries or user groups. The problems and solutions vary widely among geographic areas and among large investor-owned utilities, rural cooperatives, and municipal utilities; but there is still a great degree of commonality. Industry organizations such as the National Rural Electric Cooperative Association (NRECA), the Electric Power Research Institute (EPRI), the American Public Power Association (APPA), and the Institute of Electrical and Electronics Engineers (IEEE) have made tremendous strides in preparing self-assessment templates, optimization guides, diagnostic techniques, and better definitions of reliability and power quality measures. In addition, public utility commissions have developed codes and methods for assessing performance that consider local needs. There is considerable overlap among these various organizations, and we see real opportunity and value in sharing these methods, guides, and standards in this report. This report provides a ''toolkit'' containing synopses of noteworthy reliability measurement practices. The toolkit has been developed to address the interests of three groups: electric power users, utilities, and regulators. The report will also serve to support activities to develop and share information among industry and regulatory participants about critical resources and practices. The toolkit has been developed by investigating the status of indices and definitions, surveying utility organizations on information sharing, and preparing summaries of reliability standards and monitoring requirements--the issues, needs, work under way, existing standards, practices and guidelines--for the following three classifications: (1) terms and definitions of reliability; (2) power quality standards, guidelines, and measurements; and (3) activities and organizations developing and sharing information on distribution reliability. As these synopses of reliability measurement practices are provided, it must be noted that an economic penalty may be associated with requiring too high a reliability level from the distribution system for all customers. It may be appropriate for the distribution system to supply only some base, generally accepted level of reliability. This base level would be adequate for the majority of customers. Users who need a higher level may find it economical to supply using distributed energy resources (DER) and other local solutions to reliability and power quality needs. Local solutions implemented by the customer may be the most cost-effective method for addressing the more stringent needs of a digital economy. These local solutions include energy storage, small distributed generators, and microgrids. This report also considers the market's role in addressing reliability issues and requirements. The customer's needs are discussed in view of issues such as power quality requirements of digital electronic equipment, the cost of outages, the cost of storage and new infrastructure, and natural gas prices. The market role in addressing these issues and requirements is explored. The economic considerations associated with the reliability issues are discussed, as well as the levels at which these economic decisions could be made. Finally, a discussion is provided of the role DER could play in addressing

Kueck, JD

2005-05-06T23:59:59.000Z

409

Measurement Practices for Reliability and Power Quality  

SciTech Connect

This report provides a distribution reliability measurement ''toolkit'' that is intended to be an asset to regulators, utilities and power users. The metrics and standards discussed range from simple reliability, to power quality, to the new blend of reliability and power quality analysis that is now developing. This report was sponsored by the Office of Electric Transmission and Distribution, U.S. Department of Energy (DOE). Inconsistencies presently exist in commonly agreed-upon practices for measuring the reliability of the distribution systems. However, efforts are being made by a number of organizations to develop solutions. In addition, there is growing interest in methods or standards for measuring power quality, and in defining power quality levels that are acceptable to various industries or user groups. The problems and solutions vary widely among geographic areas and among large investor-owned utilities, rural cooperatives, and municipal utilities; but there is still a great degree of commonality. Industry organizations such as the National Rural Electric Cooperative Association (NRECA), the Electric Power Research Institute (EPRI), the American Public Power Association (APPA), and the Institute of Electrical and Electronics Engineers (IEEE) have made tremendous strides in preparing self-assessment templates, optimization guides, diagnostic techniques, and better definitions of reliability and power quality measures. In addition, public utility commissions have developed codes and methods for assessing performance that consider local needs. There is considerable overlap among these various organizations, and we see real opportunity and value in sharing these methods, guides, and standards in this report. This report provides a ''toolkit'' containing synopses of noteworthy reliability measurement practices. The toolkit has been developed to address the interests of three groups: electric power users, utilities, and regulators. The report will also serve to support activities to develop and share information among industry and regulatory participants about critical resources and practices. The toolkit has been developed by investigating the status of indices and definitions, surveying utility organizations on information sharing, and preparing summaries of reliability standards and monitoring requirements--the issues, needs, work under way, existing standards, practices and guidelines--for the following three classifications: (1) terms and definitions of reliability; (2) power quality standards, guidelines, and measurements; and (3) activities and organizations developing and sharing information on distribution reliability. As these synopses of reliability measurement practices are provided, it must be noted that an economic penalty may be associated with requiring too high a reliability level from the distribution system for all customers. It may be appropriate for the distribution system to supply only some base, generally accepted level of reliability. This base level would be adequate for the majority of customers. Users who need a higher level may find it economical to supply using distributed energy resources (DER) and other local solutions to reliability and power quality needs. Local solutions implemented by the customer may be the most cost-effective method for addressing the more stringent needs of a digital economy. These local solutions include energy storage, small distributed generators, and microgrids. This report also considers the market's role in addressing reliability issues and requirements. The customer's needs are discussed in view of issues such as power quality requirements of digital electronic equipment, the cost of outages, the cost of storage and new infrastructure, and natural gas prices. The market role in addressing these issues and requirements is explored. The economic considerations associated with the reliability issues are discussed, as well as the levels at which these economic decisions could be made. Finally, a discussion is

Kueck, JD

2005-05-06T23:59:59.000Z

410

Culture Representation in Human Reliability Analysis  

Science Conference Proceedings (OSTI)

Understanding human-system response is critical to being able to plan and predict mission success in the modern battlespace. Commonly, human reliability analysis has been used to predict failures of human performance in complex, critical systems. However, most human reliability methods fail to take culture into account. This paper takes an easily understood state of the art human reliability analysis method and extends that method to account for the influence of culture, including acceptance of new technology, upon performance. The cultural parameters used to modify the human reliability analysis were determined from two standard industry approaches to cultural assessment: Hofstede’s (1991) cultural factors and Davis’ (1989) technology acceptance model (TAM). The result is called the Culture Adjustment Method (CAM). An example is presented that (1) reviews human reliability assessment with and without cultural attributes for a Supervisory Control and Data Acquisition (SCADA) system attack, (2) demonstrates how country specific information can be used to increase the realism of HRA modeling, and (3) discusses the differences in human error probability estimates arising from cultural differences.

David Gertman; Julie Marble; Steven Novack

2006-12-01T23:59:59.000Z

411

Reliability of islanded microgrids with stochastic generation and prioritized load  

E-Print Network (OSTI)

The potential to improve distribution system reliability is a primary motivation behind the development and deployment of microgrids. Previous studies have illustrated substantial reliability benefits of dispatchable ...

Marden, Mirjana Milosevic

412

Efficient and Reliable Reactive Power Supply and Consumption...  

NLE Websites -- All DOE Office Websites (Extended Search)

Efficient and Reliable Reactive Power Supply and Consumption - Insights from an Integrated Program of Engineering and Economics Research Title Efficient and Reliable Reactive Power...

413

Office of Electricity Delivery and Energy Reliability: Organizational...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Skip to main content Energy.gov Office of Electricity Delivery & Energy Reliability Search form Search Office of Electricity Delivery & Energy Reliability Services Electricity...

414

Improving the Reliability and Resiliency of the US Electric Grid...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improving the Reliability and Resiliency of the US Electric Grid: SGIG Article in Metering International, March 2012 Improving the Reliability and Resiliency of the US Electric...

415

Load Control for System Reliability and Measurement-Based Stability...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Load Control for System Reliability and Measurement-Based Stability Assessment Load Control for System Reliability and Measurement-Based Stability Assessment Research and develop...

416

Cyber Effects Analysis Using VCSE Promoting Control System Reliability...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cyber Effects Analysis Using VCSE Promoting Control System Reliability Cyber Effects Analysis Using VCSE Promoting Control System Reliability This report describes the Virtual...

417

Office of Electricity Delivery & Energy Reliability 2010 Strategic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Office of Electricity Delivery & Energy Reliability 2010 Strategic Plan (WEB) Office of Electricity Delivery & Energy Reliability 2010 Strategic Plan...

418

Office of Electricity and Delivery & Energy Reliability 2010...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Office of Electricity and Delivery & Energy Reliability 2010 Strategic Plan (PRINT) Office of Electricity and Delivery & Energy Reliability 2010 Strategic...

419

Washington DC Reliability Requirements and the Need to Operate...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005)...

420

An Examination of Temporal Trends in Electricity Reliability...  

NLE Websites -- All DOE Office Websites (Extended Search)

An Examination of Temporal Trends in Electricity Reliability Based on Reports from U.S. Electric Utilities Title An Examination of Temporal Trends in Electricity Reliability Based...

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Office of Electricity Delivery And Energy Reliability To Hold...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy Reliability To Hold Technical...

422

Office of Electricity Delivery & Energy Reliability FY 2012 Budget...  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request Presentation Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request Presentation...

423

2013 Reliability & Markets Peer Review | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

2013 Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 13 presentations over 2 days on August 6 - 7, 2013 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are included below. The Reliability and Markets activity of the Transmission Reliability program researches, develops, and implements electricity infrastructure and market simulations that integrate economics and engineering principles. The activity helps to ensure electric reliability, while also improving the efficiency and economics of market operations. Day 1: August 6 Session I Transmission Investment Assessment Under Uncertainty, Ben Hobbs,

424

Materials Science and Technology Division - Physical Sciences Directorate -  

NLE Websites -- All DOE Office Websites (Extended Search)

STG STG For the Public Publications Visiting ORNL For Researchers Profiles Group Leader Staff Members For Industry Sponsored Research Programs Our People Contacts by Group Leader, Staff Members Find People Related Cooperative Research and Development Agreement Work for Others Recent News & Features News Releases Archive | Features Archive PSD Directorate › MST Division › Scattering and Thermophysics Group The Scattering and Thermophysics Group aims to be a national leader in materials characterization using diffraction and thermophysical property measurement methods. The diffraction portion of the Group utilizes laboratory x-ray, synchrotron x-ray, and neutron diffraction facilties to solve problems from phase stability to residual stress and texture. The thermography and thermophysical properties of the Group has exceptional

425

Materials Science and Technology Division - Physical Sciences Directorate -  

NLE Websites -- All DOE Office Websites (Extended Search)

TFN TFN For the Public Visiting ORNL For Researchers Profiles Group Leader Staff Members For Industry Core Compentencies Our People Group Leader, Staff Members Find People Energy Frontier Research Center Center for Defect Physics (EFRC) User Facilities High Temperature Materials Laboratory (HTML) Shared Research Equipment User Facility (ShaRE) Related User Facilities Center for Nanophase Materials Sciences (CNMS) High Flux Isotope Reactor (HFIR) Spallation Neutron Source (SNS) Seminars and Announcements MSTD Internal Recent News & Features News Releases Archive | Features Archive PSD Directorate › MST Division › Thin Films and Nanostructures Group Complex oxide thin films and heterostructures are important for not only fundamental physics, but also a wide range of exciting opportunities in

426

Mr. Timothy Orr Director of Product Development Advanced Distributor Products  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 4, 2010 November 4, 2010 Mr. Timothy Orr Director of Product Development Advanced Distributor Products RE: Case No. 2010-SE-0304 Dear Mr. On, On May 28, 2010, DOE issued a Notice of Noncompliance Determination for two air conditioning heat pumps (basic model N2H348A(G)KB* + H,GE50560 + *8MPV125 and basic model N2H360A(G)KB* + H,GE50560 + MV16J22**B*) manufactured by Advanced Distributor Products (ADP). Pursuant to that Notice, ADP provided information indicating that it had not sold these products in the United States. DOE, as the agency charged with developing and administering a balanced and coordinated national energy policy, has determined, in light of these circumstances, that closing this case without further action properly balances the policies recognized in the Energy Policy and

427

Materials Science and Technology Division - Physical Sciences Directorate -  

NLE Websites -- All DOE Office Websites (Extended Search)

MTG MTG For the Public News & Highlights Publications Seminars Workshops Our People Group Leader, Staff Members Find People Fact Sheet Energy Frontier Research Center Center for Defect Physics (EFRC) Related Groups Computational Materials Science Group (CSMD) Nanomaterials Theory Institute (CNMS) Single Crystal Diffraction Group (NScD) University of Tennesee (MSE) ORNL Materials in Extreme Environments Other Useful Links American Physical Society DOE Office of Science Institute of Physics Office of Basic Energy Sciences National Energy Research Scientific Computing Center The Minerals, Metals & Materials Society U.S. Department of Energy Advanced Materials Group In The News PSD Directorate › MST Division › Materials Theory Group The Materials Theory Group (MTG) of the Materials Science and Technology

428

Mr. Larry W. Camper Director, Division of Waste Management  

NLE Websites -- All DOE Office Websites (Extended Search)

NOV 0 1 2013 NOV 0 1 2013 Mr. Larry W. Camper Director, Division of Waste Management and Environmental Protection U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852 Dear Mr. Camper: Thank you for your July 31 letter referencing the "US. Nuclear Regulatory, Commission Staff Comments and Requests for Additional Information on the Draft Basis for Section 3116 Determination for Closure of H-Tank Farm at the Savannah River Site and on the Performance Assessment for the H-Area Tank Farm for the Savannah River Site." The Department of Energy has prepared the enclosed responses to the request for additional information. These responses are for your use in completing the consultation process on the Draft Basis for Section 3116

429

W. E. Mott, Director, Division of Environmental Control Technology, HQ  

Office of Legacy Management (LM)

Eyergy Eyergy pak t??pEOperatlons dak Ridge, Tennessee 37830 December 12, 1977 W. E. Mott, Director, Division of Environmental Control Technology, HQ Germantown, M.S. E-201 REPORT OF FINDINGS: ALLIED CHEMICAL CORPORATION SITES AT NORTH CLAYMONT, DELAWARE; MARCUS HOOK, PENNSYLVANIA, AND BALTIMORE, MARYLAND The following information summarizes our findings and conclusions relative to the reassessment of the subject sites. Information supplied from files of the former Atomic Energy Commission, Division of Raw Materials, indicates the company was engaged during the 1950's in research and development and pilot scale operations on uranium recovery at North Claymont, Delaware, and possibly at other Allied Chemical sites at Marcus Hook, Pa., and Baltimore, Md. under

430

Mr. Carl Schafer I Director of Environmental Policy  

Office of Legacy Management (LM)

I I Director of Environmental Policy Office of the Deputy Assistant Secretary of Defense for Installations Pentagon ,. .-.:-.. *" ~?.'.::,:' - Washington, D.C. 20301 Dear Mr. Schafer: As you know, the Department of Energy (DOE) is implementing a-program to identify sites that may be radiologically contaminated as a result of DOE predecessor operations and to correct any problems associated with this contamination if there is DOE authority to do so. Reviews of historical materials from the Manhattan Engineer District (MED) and Atomic Energy Coannission (AEC) era conducted in support of this program have identified a number of active and former Department of Defense (DOD) installations and DOD contractor sites involved in activities related to the MED/AEC

431

Materials Science and Technology Division - Physical Sciences Directorate -  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities Facilities Selected Publications Our People Contacts by Group Leader, Staff Members Find People Energy Frontier Research Center Center for Defect Physics (EFRC) User Facilities High Temperature Materials Laboratory (HTML) Shared Research Equipment ShaRE User Facility (ShaRE) Related User Facilities Center for Nanophase Materials Sciences (CNMS) High Flux Isotope Reactor (HFIR) Spallation Neutron Source (SNS) Correlated Electron Materials Group In The News PSD Directorate › MST Division › Correlated Electron Materials Group CdSiP2Tin Flux The ultimate aim of our research is to attain a better understanding of complex materials, particularly those that are important to clean energy technologies. For example, we are currently investigating the relationship between magnetism and superconductivity, new mechanisms for enhancing

432

ACTING DIRECTOR OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2011 3, 2011 FROM : ACTING DIRECTOR OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT SUBJECT: Fiscal Year's (FY) 2011 and 2012 Balanced Scorecard Guidance for Federal Sites and Contractor Purchasing Organizations The Balanced Scorecard (BSe) performance management methodology continues to provide the Office of Procurement and Assistance Management (OPAM) with valuable insight into the health of the procurement function at the Department's Federal procurement offices and the purchasing organizations of its major site and facility contractors. This memorandum forwards BSC guidance regarding FY 2011 reporting and FY 2012 core measures. FY 2011 Federal BSC Reports shall be forwarded to Eileen McGlinn, MA-621 Field Assistance and Oversight Division , no later than December 2, 2011. FY 2011 Contractor

433

The Computation Directorate at Lawrence Livermore National Laboratory  

Science Conference Proceedings (OSTI)

The Computation Directorate at Lawrence Livermore National Laboratory has four major areas of work: (1) Programmatic Support -- Programs are areas which receive funding to develop solutions to problems or advance basic science in their areas (Stockpile Stewardship, Homeland Security, the Human Genome project). Computer scientists are 'matrixed' to these programs to provide computer science support. (2) Livermore Computer Center (LCC) -- Development, support and advanced planning for the large, massively parallel computers, networks and storage facilities used throughout the laboratory. (3) Research -- Computer scientists research advanced solutions for programmatic work and for external contracts and research new HPC hardware solutions. (4) Infrastructure -- Support for thousands of desktop computers and numerous LANs, labwide unclassified networks, computer security, computer-use policy.

Cook, L

2006-09-07T23:59:59.000Z

434

Executive Director for Operations PROPOSED RULE ON DECOMMISSIONING TRUST PROVISIONS  

E-Print Network (OSTI)

To request Commission approval to publish a proposed rule in the Federal Register on decommissioning trust agreement requirements. BACKGROUND: The staff presented a rulemaking plan (SECY-00-0002) to the Commission on December 30, 1999. The plan discussed two actions relating to amending nuclear power reactor decommissioning trust provisions i.e., to amend 10 CFR 50.75 and revise Regulatory Guide 1.159. Subsequently, in a February 9, 2000, staff requirements memorandum (SRM) to the Executive Director for Operations (Attachment 1), the Commission authorized the staff to proceed with the rulemaking plan. Further, the Commission instructed the staff that “any specific trust fund terms and conditions necessary to protect the funds fully should be set out in the rule itself, not in the regulatory guide. Sample language for trust agreements consistent with the terms and conditions within the rule may be provided within the associated regulatory guide.” The attached Federal Register notice (FRN) responds to the SRM. DISCUSSION: Contact:

William D. Travers; Brian Richter

2001-01-01T23:59:59.000Z

435

MEMORANDUM FOR: Elizabeth Shearer Director Federal Energy Management Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ands© ~Department of Energy Ands© ~Department of Energy Washington, DC 205B5 July 25, 2001 MEMORANDUM FOR: Elizabeth Shearer Director Federal Energy Management Program FROM: Lawrence R. Ol / Assistant General Counsel Energy Efficiency SUBJECT: Request for Meeting From Energy Company Over the past several days I have had telephone conversations with Leonard Rawicz, an attorney in the Washington office of Skadden, Arps, Slate, Meagher and Flom. Mr. Rawicz is Washington counsel for Real Energy, a California cogeneration company (www.RealEnergv.com). Real Energy generates electricity and thermal energy on-site and at lower cost than the purchasers would pay to a local utility. This cogeneration system has been installed at several sites in California. Real Energy is interested in installing its cogeneration

436

Materials Science and Technology Division - Physical Sciences Directorate -  

NLE Websites -- All DOE Office Websites (Extended Search)

ABD ABD For the Public Visiting ORNL For Researchers Profiles Group Leader Staff Members Facilities For Industry Research Projects Our People Group Leader, Staff Members, Facilities Find People Energy Frontier Research Center Center for Defect Physics (EFRC) User Facilities High Temperature Materials Laboratory (HTML) Shared Research Equipment User Facility (ShaRE) Related User Facilities Center for Nanophase Materials Sciences (CNMS) High Flux Isotope Reactor (HFIR) Spallation Neutron Source (SNS) Seminars and Announcements MSTD Internal Recent News & Features News Releases Archive | Features Archive PSD Directorate › MST Division › Alloy Behavior and Design Group The principal technical contact for discussing potential projects in the Alloy Behavior and Design Group is Dr. Easo P. George, Group Leader.

437

Glen F. Wattman Director, Office of Aviation Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Glen F. Wattman Glen F. Wattman Director, Office of Aviation Management A native of New York, Glen Wattman has served as a civilian Airline Pilot for more than thirteen years flying Boeing 757, 767 and 727 transport category aircraft. He has extensive experience operating flights domestically and throughout Central and South America and Europe. Mr. Wattman is currently a Major in the United States Air Force Reserve and serves as a subject matter expert as a liaison to the Florida Wing of the Civil Air Patrol. Mr. Wattman has expertise in all aspects of the CAP mission to include Disaster Relief, Search and Rescue, Civil Defense, Homeland Security, Drug Interdiction, and Aerospace Education. Prior to becoming an Airline Pilot, Mr. Wattman served as an Air Force Officer, Detachment Commander, Fighter Pilot, and

438

MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

,2008 ,2008 MEMORANDUM FROM: THOMAS E. BROWN, DIRECTOR OFFICE OF CONTRACT MANAGEMENT OFFICE OF PROCUREMENT AND ASSISTANCE MANAGEMENT SUBJECT: Contract Change Order Administration of Department of Energy Prime Contracts The purpose of this memorandum is to highlight the need for good contract administration of Department of Energy (DOE) contracts (non management and operating contracts) including those covered by DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. One of the focus areas of the DOE's efforts to improve contract and project management is the recopition that effectrve contract change order administration is critical to ensuring that contract and project requirements are met. Fundamentally, the award of an appropriate contract type that best

439

Post Critical Decision-4 Mark Arenaz, Federal Project Director  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31, 2011 31, 2011 Lessons Learned from the In-Situ Grouting in the Subsurface Disposal Area Post Critical Decision-4 Mark Arenaz, Federal Project Director Summary Protection of the Snake River Plain Aquifer is a major driver for environmental remediation at the Department of Energy's (DOE) Idaho Site. In 2010, the Idaho Cleanup Project (ICP) used in-situ grouting to stabilize buried waste and reduce the migration of specific radioactive contaminates to the aquifer. The action was accomplished using American Recovery and Reinvestment Act (Public Law 111-5) Program funding of a capital asset acquisition project under DOE Order 413.3A, Program and Project Management for Acquisition of Capital Assets. Lessons learned from previous subsurface grouting activities contributed to the safe, timely and

440

Materials Science and Technology Division - Physical Sciences Directorate -  

NLE Websites -- All DOE Office Websites (Extended Search)

CST CST For the Public Publications Visiting ORNL For Researchers Profiles Group Leader Staff Members Facilities For Industry Capabilities Current Research Materials Our People Group Leader, Staff Members Find People Fact Sheet Group Poster Energy Frontier Research Center Center for Defect Physics (EFRC) User Facilities High Temperature Materials Laboratory (HTML) Shared Research Equipment User Facility (ShaRE) Related User Facilities Center for Nanophase Materials Sciences (CNMS) High Flux Isotope Reactor (HFIR) Spallation Neutron Source (SNS) Seminars and Announcements MSTD Internal Recent News & Features News Releases Archive | Features Archive PSD Directorate › MST Division › Corrosion Science and Technology Group Corrosion Kinetics in simulated high-temperature/high-pressure environments

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

MEMORANDUM FOR RICHARD H. HOPF DIRECTOR, OFFICE AND ASSIST SENIOR  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RICHARD H. HOPF RICHARD H. HOPF DIRECTOR, OFFICE AND ASSIST SENIOR FROM: SUBffiCT: As the Chief Acquisition Officer (CAO) for the Department, I have been assigned the functions prescribed by Section 16 of the Office of Federal Procurement Policy Act (41 V.S.C. 414), as amended by the Services Acquisition Refonn Act, Pub. L. 108-136. In your capacity as Senior Procurement Executive, you are responsible for a number of activities and maintain certain management and control systems critical to the successful fulfillment of these CAO functions. Accordingly, consistent with the attached, you will perfonn these activities in support of me and report to me on various aspects of the Department of Energy (DOE) acquisition system. Attachment Department of Energy Washington, DC 20585

442

Anthony V. Cugini Director, National Energy Technology Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Anthony V. Cugini Anthony V. Cugini Director, National Energy Technology Laboratory U. S. Department of Energy Before the Subcommittee on Energy and Environment Committee on Science, Space, and Technology U.S. House of Representatives November 30, 2012 Chairman Harris, Ranking Member Miller, and members of the Subcommittee, I appreciate the opportunity to discuss the role that the Department of Energy's Office of Fossil Energy's National Energy Technology Laboratory continues to play in the safe and responsible development of the Nation's unconventional oil and natural gas resources. As you know, since 2008, U.S. oil and natural gas production has increased each year. In 2011, U.S. crude oil production reached its highest level in nearly a decade. Natural gas production

443

Fermilab | Directorate | Internal Audit Services | Risk Assessment and  

NLE Websites -- All DOE Office Websites (Extended Search)

Risk Assessment and Planning Risk Assessment and Planning How are topics selected for an internal audit? A Year At A Glance Throughout the year we collect ideas and input from the Board of Directors Audit Committee, Management, DOE Fermi Site Office and DOE Office of Inspector General. We also reference the Contractor Assurance System (CAS) web pages for information about the structure of the systems. In addition, CAS (management system) owners are interviewed with respect to Internal Audit's risk assessments and audit plans. We prepare reports that summarize the results of individual audits, as well issue an annual report of activities. Internal audit reports are distributed as they are issued, to a wide audience including the Audit Committee, Management, the DOE Fermi Site Office, the DOE Chicago Office,

444

Charles D. Young Project Engineer Government Support Directorate  

Office of Legacy Management (LM)

Please call if you have questions regarding the attached recommendation. i?&,o-o; Please call if you have questions regarding the attached recommendation. i?&,o-o; ~~~pApv $l$I Charles D. Young Project Engineer Government Support Directorate Architecture Planning and Technology Division CDY/smb Attachment cc: J. Fiore ;;,ewis (w/o) TH' E AEROSPACE CORPORATION i ' 0 A Suite 7900, 955 L' Enfam Plaza. S. W., Woshingron. D.C. 20024-2174. Tekphonc (202) 488-6000 7117-03.87.cdy.43 23 September 1987 CA Mr. Andrew Wallo, III, NE-23 Division of Facility & Site Decosunissioning Projects U.S. Department of Energy Germantown, Maryland 20545 Dear Mr. Wallo: ELIMINATION RECOMMENDATION -- COLLEGES AND UNIVERSITIES The attached elimination reconnnendation was prepared in accordance PC.o= with your suggestion during our meeting on 22 September. The recommendation flD.o-02

445

Nuclear Power - Control, Reliability and Human Factors  

E-Print Network (OSTI)

Advances in reactor designs, materials and human-machine interfaces guarantee safety and reliability of emerging reactor technologies, eliminating possibilities for high-consequence human errors as those which have occurred in the past. New instrumentation and control technologies based in digital systems, novel sensors and measurement approaches facilitate safety, reliability and economic competitiveness of nuclear power options. Autonomous operation scenarios are becoming increasingly popular to consider for small modular systems. This book belongs to a series of books on nuclear power published by InTech. It consists of four major sections and contains twenty-one chapters on topics from key subject areas pertinent to instrumentation and control, operation reliability, system aging and human-machine interfaces. The book targets a broad potential readership group - students, researchers and specialists in the field - who are interested in learning about nuclear power.

Tsvetkov, Pavel

2011-09-01T23:59:59.000Z

446

Reliability based investigation of design factors  

SciTech Connect

Second-moment probabilistic techniques are used to formulate structural resistances and loads and to derive reliability-based safety, load, and strength factors for design. Existing concepts of the second-moment reliability theory have been extended to the practical case of multiple load combinations. This development consistently includes the stochastic character of loads and the unpredictable nature of their combinations. For this purpose, a new technique for the evaluation of load combinations is presented, whereby the moments of the extreme of combined loads is obtained in terms of the moments of individual loads and parameters describing their random fluctuations in time. Reliability-based safety, load, and strength factors are derived in terms of the acceptable level of risk, the coefficients of variation of the loads and resistance, uncertainties associated with errors in modeling and estimation, and a set of parameters describing the stochastic nature of loads and their combinations.

1978-06-30T23:59:59.000Z

447

Smart Grid: Creating Jobs while Delivering Reliable,  

Open Energy Info (EERE)

Smart Grid: Creating Jobs while Delivering Reliable, Smart Grid: Creating Jobs while Delivering Reliable, Environmentally-friendly Energy Home > Groups > OpenEI Community Central Graham7781's picture Submitted by Graham7781(1992) Super contributor 2 March, 2010 - 14:14 imported OpenEI On April 16th, 2009, Vice President Joe Biden announced that the Department of Energy was planning to develop a stronger, more reliable energy grid. The plan would allocate $3.4 billion in funds to be distributed across the nation, aiding projects aimed at improving and updating the current electrical power grid in the United States. Two projects are funded by smart grid: smaller and larger. Smaller projects range from $300,000 to $20,000,000. These projects typically focus on upgrading equipment in less populated ares. Larger projects range from

448

Electricity Delivery and Energy Reliability PROGRAM DESCRIPTION  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Electricity Delivery and Energy Reliability PROGRAM DESCRIPTION The Office of Electricity Delivery and Energy Reliability (OE) leads national efforts to modernize the electric grid, enhance security and reliability of energy infrastructure, and facilitate recovery from disruptions to the energy supply. As stated in the President's A Policy Framework for the 21 st Century Grid, a smarter, modernized electric grid is fundamental to transforming the Nation's energy system and securing US leadership in a clean energy future. OE supports activities that enable innovation across the energy sector, empower American consumers, and secure our energy future. OE consists of three programs: Research and Development; Permitting, Siting and Analysis; and Infrastructure Security and Energy Restoration.

449

Department of Energy Names Director for Office of Indian Energy Policy and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Names Director for Office of Indian Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands September 14, 2007 - 2:33pm Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the appointment of Steven J. Morello to be Director of DOE's newly formed Office of Indian Energy Policy and Programs. As Director of this office, Mr. Morello will work to implement and manage energy planning, education and efficiency for American Indian tribes. Also today, the Secretary announced that DOE's Office of Energy Efficiency and Renewable Energy would make available a total of up to $2 million for

450

Ask the Directors: Secretary Chu to Host Live Chat on the Energy Innovation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ask the Directors: Secretary Chu to Host Live Chat on the Energy Ask the Directors: Secretary Chu to Host Live Chat on the Energy Innovation Hubs Ask the Directors: Secretary Chu to Host Live Chat on the Energy Innovation Hubs March 5, 2012 - 12:32pm Addthis Secretary Chu is accepting questions on Facebook, Twitter and e-mail for the Energy Innovation Hub directors -- who are working to build better nuclear reactors, obtain fuel from sunlight and design the most energy efficient buildings to date. Michael Hess Michael Hess Former Digital Communications Specialist, Office of Public Affairs How can I participate? Submit your questions on Facebook, Twitter (@energy), or send an e-mail to newmedia@hq.doe.gov, prior to or during the live event. Secretary Chu will host a live, streaming Q&A session with the directors of the Energy Innovation Hubs on Tuesday, March 6, at 2:15 p.m. EST at

451

Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fernald Environmental Management Project Director's Final Findings and Orders, Octobe.. Page 1 of 17 Fernald Environmental Management Project Director's Final Findings and Orders, Octobe.. Page 1 of 17 EM Home | Regulatory Compliance | Environmental Compliance Agreements Fernald Environmental Management Project Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Fernald Environmental Management Project : Findings and Orders P.O. Box 389705 : Cincinnati, Ohio 45239 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution

452

Supplemental Comments of David K. Paylor, Director of the Commonwealth of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

David K. Paylor, Director of the David K. Paylor, Director of the Commonwealth of Virginia's Department of Environmental Quality Supplemental Comments of David K. Paylor, Director of the Commonwealth of Virginia's Department of Environmental Quality Docket No. EO-05-01: Pursuant to Department of Energy ("DOE") Order No. 202-06-1 issued February 17,2006, David K. Paylor ("Director"), Director of the Virginia Department of Environmental Quality ("DEQ"), through his counsel Robert F. McDonnell, the Attorney General of Virginia, submits these comments concerning the operation of the Potomac River Generation Station Power Plant ("Potomac River Power Plant" or "Plant"), owned by Mirant Potomac River, LLC ("Mirant") and located in Alexandria, Virginia.

453

Secretary Comments on the Selection of the Next Executive Director of the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments on the Selection of the Next Executive Director Comments on the Selection of the Next Executive Director of the International Energy Agency Secretary Comments on the Selection of the Next Executive Director of the International Energy Agency March 11, 2011 - 12:00am Addthis Washington, D.C. - The Governing Board of the International Energy Agency (IEA) today announced that their 28 members have selected Maria Van der Hoeven of the Netherlands, the former Dutch Minister of the Economy, to be the Agency's next Executive Director. Ms. Van der Hoeven will succeed Nobuo Tanaka of Japan effective September 1, 2011. The United States thanks Mr. Tanaka for his service and offers its congratulations to Ms. Van der Hoeven. Secretary of Energy Steven Chu said, "We congratulate Maria Van der Hoeven on her new role as Executive Director of the IEA. Her leadership will be

454

We're Hiring: Deputy Director for the Office of Civil Rights | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

We're Hiring: Deputy Director for the Office of Civil Rights We're Hiring: Deputy Director for the Office of Civil Rights We're Hiring: Deputy Director for the Office of Civil Rights May 31, 2013 - 3:04pm Addthis From now through June 27, 2013, applications are open for the Deputy Director position in the Office of Civil Rights. The Office of Civil Rights carries great responsibility for developing and administering Departmental policies, practices and procedures under Title VI and VII of the Civil Rights Act of 1964, Title IX of the Education Amendments of 1972, the Rehabilitation Act of 1973, and related statues and Executive Orders which prohibit discrimination in programs and activities receiving federal financial assistance. Learn more about the position and apply here. The Deputy Director serves as an expert advisor and makes determinations on

455

DOE Appoints Stephen Eule As Director of the Climate Change Technology  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appoints Stephen Eule As Director of the Climate Change Appoints Stephen Eule As Director of the Climate Change Technology Program DOE Appoints Stephen Eule As Director of the Climate Change Technology Program March 31, 2006 - 9:51am Addthis WASHINGTON , D.C. - Secretary of Energy Samuel W. Bodman today announced the appointment of Stephen D. Eule as the Director of the Climate Change Technology Program (CCTP) in the Office of Policy and International Affairs. "With his depth of experience in science, environmental and energy policy issues, Steve will provide invaluable counsel to the Department and this Administration as we work to bring the latest in climate change technology to the forefront," Secretary Bodman said. As director of the CCTP, Mr. Eule will coordinate the federal government's technology research and development (R&D) activities. Through a

456

Department of Energy Names Director for Office of Indian Energy Policy and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Names Director for Office of Indian Energy Department of Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands Department of Energy Names Director for Office of Indian Energy Policy and Makes Available $2 Million for Clean Energy Projects on Tribal Lands September 14, 2007 - 2:33pm Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the appointment of Steven J. Morello to be Director of DOE's newly formed Office of Indian Energy Policy and Programs. As Director of this office, Mr. Morello will work to implement and manage energy planning, education and efficiency for American Indian tribes. Also today, the Secretary announced that DOE's Office of Energy Efficiency and Renewable Energy would make available a total of up to $2 million for

457

Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, October 4, 1995  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Portsmouth Gaseous Diffusion Plant Director's Final Portsmouth Gaseous Diffusion Plant Director's Final Findings and Orders, October 4, 1995 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the Matter Of: United States Department of Energy : Director's Final Portsmouth Gaseous Diffusion Plant : Findings and Orders P.O. Box 700 : Piketon, Ohio 45661-0700 : Respondent It is hereby agreed by and among the parties hereto as follows: Table of Contents I. Jurisdiction II. Parties Bound III. Definitions IV. Findings of Fact V. Orders VI. Limitations of Director's Approval VII. Notice VIII. Project Managers IX. Dispute Resolution X. Funding XI. Other Applicable Laws XII. Reservation of Rights XIII. Modification XIV. Termination XV. Other Claims XVI. Signatories XVII. Waiver I. Jurisdiction These Director's Final Findings and Orders ("Orders") are issued to the United States

458

Secretary Bodman and Rosatom Director Kiriyenko Meet to Discuss U.S.-Russia  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Rosatom Director Kiriyenko Meet to Discuss and Rosatom Director Kiriyenko Meet to Discuss U.S.-Russia Nuclear Security Progress Secretary Bodman and Rosatom Director Kiriyenko Meet to Discuss U.S.-Russia Nuclear Security Progress February 1, 2008 - 11:13am Addthis WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman and Russian Federal Atomic Energy Agency (Rosatom) Director Sergey Kiriyenko today met to highlight U.S.-Russian efforts to keep nuclear weapons and weapons material out of the hands of terrorists. Secretary Bodman and Director Kiriyenko discussed progress made and next steps to shutdown Russia plutonium reactors this year, dispose of 68 metric tons of plutonium, and advance cooperation to expand the use of civilian nuclear energy through the Global Nuclear Energy Partnership. Secretary Bodman also highlighted

459

Los Alamos lab director to link science education, national security in  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab director to link science education, national security in talk Lab director to link science education, national security in talk Los Alamos lab director to link science education, national security in TEDxABQ talk McMillan will describe the events that led to his career in science and share suggestions on how non-scientists can inspire young people to STEM careers and scientific literacy. September 5, 2013 Los Alamos National Laboratory Director Charlie McMillan Los Alamos National Laboratory Director Charlie McMillan Contact Fred deSousa Communications Office (505) 665-3430 Email "Finding young people with the scientific and technical capabilities to carry on the Laboratory's national security missions will be critical, but the linkage to national security goes beyond that," McMillan said. Watch live stream at home or at Bradbury Science Museum

460

Ask the Directors: Secretary Chu to Host Live Chat on the Energy Innovation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ask the Directors: Secretary Chu to Host Live Chat on the Energy Ask the Directors: Secretary Chu to Host Live Chat on the Energy Innovation Hubs Ask the Directors: Secretary Chu to Host Live Chat on the Energy Innovation Hubs March 5, 2012 - 12:32pm Addthis Secretary Chu is accepting questions on Facebook, Twitter and e-mail for the Energy Innovation Hub directors -- who are working to build better nuclear reactors, obtain fuel from sunlight and design the most energy efficient buildings to date. Michael Hess Michael Hess Former Digital Communications Specialist, Office of Public Affairs How can I participate? Submit your questions on Facebook, Twitter (@energy), or send an e-mail to newmedia@hq.doe.gov, prior to or during the live event. Secretary Chu will host a live, streaming Q&A session with the directors of the Energy Innovation Hubs on Tuesday, March 6, at 2:15 p.m. EST at

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Network location of a reliable center using the most reliable route policy  

Science Conference Proceedings (OSTI)

This paper considers a single location on an undirected network with unreliable edges that maximizes the lowest performance level of the network service with respect to all nodes. The problem is termed the reliable 1-center problem and finds applications ... Keywords: 1-Center, Location theory, Network reliability, Stochastic optimization

José Santiváñez; Emanuel Melachrinoudis; Mary E. Helander

2009-05-01T23:59:59.000Z

462

Gearbox Reliability Collaborative Update: A Brief (Presentation)  

DOE Green Energy (OSTI)

This presentation is an update on the Gearbox Reliability Collaborative (GRC) for the AWEA Wind Project Operations, Maintenance & Reliability Seminar. GRC accomplishments are: (1) Failure database software deployed - partners see business value for themselves and customers; (2) Designed, built, instrumented, and tested two gearboxes - (a) Generated unprecedented public domain test data from both field testing and dynamometer testing, (b) Different responses from 'identical' gearboxes, (c) Demonstrated importance of non-torque loading and modeling approach; and (3) Active collaborative, with wide industry support, leveraging DOE funding - Modeling round robin and Condition Monitoring round robin.

Sheng, S.; Keller, J.; McDade, M.

2012-01-01T23:59:59.000Z

463

Gearbox Reliability Collaborative Update: A Brief (Presentation)  

SciTech Connect

This presentation is an update on the Gearbox Reliability Collaborative (GRC) for the AWEA Wind Project Operations, Maintenance & Reliability Seminar. GRC accomplishments are: (1) Failure database software deployed - partners see business value for themselves and customers; (2) Designed, built, instrumented, and tested two gearboxes - (a) Generated unprecedented public domain test data from both field testing and dynamometer testing, (b) Different responses from 'identical' gearboxes, (c) Demonstrated importance of non-torque loading and modeling approach; and (3) Active collaborative, with wide industry support, leveraging DOE funding - Modeling round robin and Condition Monitoring round robin.

Sheng, S.; Keller, J.; McDade, M.

2012-01-01T23:59:59.000Z

464

Reliability and maintainability seminar: summary of proceedings  

DOE Green Energy (OSTI)

The following are described briefly: Overview of the Federal Reliability and Maintainability Program Plan, Summary of Proceedngs, Overview of Southern Solar Energy Center Programs, and Solar Domestic Hot Water Design Guidelines Handbook. Also included are the Seminar Agenda and the list of Seminar Attendees. (MHR)

Beek, C.R.

1981-04-01T23:59:59.000Z

465

Software reliability assessment via fuzzy logic model  

Science Conference Proceedings (OSTI)

Recently in software engineering it became of great importance to be able to reason about non functional characteristics of software. This holds for a large variety of application areas like embedded and safety-critical software systems as well as service-oriented ... Keywords: fuzzy logic, fuzzy models, service oriented software systems, software reliability

Olga Georgieva; Aleksandar Dimov

2011-06-01T23:59:59.000Z

466

Reliable and efficient reprogramming in sensor networks  

Science Conference Proceedings (OSTI)

Retasking and remote programming of sensor networks is an essential functionality to make these networks practical and effective. As the availability of more capable sensor nodes increases and new functional implementations continue to be proposed, these ... Keywords: Broadcast, energy efficiency, minimum energy broadcast, reliable distribution, reprogramming, retasking, sensor networks

Chris Miller; Christian Poellabauer

2010-08-01T23:59:59.000Z

467

Reliability enhancement using optimal distribution feeder reconfiguration  

Science Conference Proceedings (OSTI)

Failure statistics show that distribution networks engage the most contribution to the customer unavailability services. Optimal reconfiguration of distribution systems has many advantages like total power losses reduction, voltage profile enhancement, ... Keywords: AENS, DFR, Distribution feeder reconfiguration (DFR), ISFLA, Improved shuffled frog leaping algorithm (ISFLA), MDFR, Multiobjective optimization, Reliability enhancement, SAIDI, SAIFI

Abdollah Kavousi-Fard; Mohammad-Reza Akbari-Zadeh

2013-04-01T23:59:59.000Z

468

An ATM Adaptation Layer for Reliable Transfers  

Science Conference Proceedings (OSTI)

There has been much attention given to ATM Adaptation Layers (AAL) over the ten-year history of ATM standardization. Yet none of the existing standards include a retransmission protocol to ensure reliability of the transfers. In this paper we propose ...

Gunnar Karlsson

1996-09-01T23:59:59.000Z

469

Reliability of underwater hearing thresholds in pinnipeds  

E-Print Network (OSTI)

Reliability of underwater hearing thresholds in pinnipeds Brandon L. Southall Long Marine@ucsc.edu Abstract: Repeated measures of low-frequency underwater hearing sensi- tivity in individuals of three and certain testing parameters (e.g., equipment and research personnel), measured underwater hearing

Reichmuth, Colleen

470

Guidelines for New High Reliability Fossil Plants  

Science Conference Proceedings (OSTI)

Many new power plants are being constructed throughout the world, and many organizations are beginning to design and commission new fossil plants. These circumstances provide an excellent opportunity to build long-term reliability into the specifications and designs for the new plants.

2009-01-28T23:59:59.000Z

471

Guidelines for New High Reliability Fossil Plants  

Science Conference Proceedings (OSTI)

The purity of water and steam is central to ensuring fossil plant component availability and reliability. New plants should have the optimum cycle chemistry features designed in, and the guidelines provided in this report will assist owners and operators of new plants in specifying these features during the design phase.

2007-02-26T23:59:59.000Z

472

Reliable water supply system design under uncertainty  

Science Conference Proceedings (OSTI)

Given the natural variability and uncertainties in long-term predictions, reliability is a critical design factor for water supply systems. However, the large scale of the problem and the correlated nature of the involved uncertainties result in models ... Keywords: Data uncertainty, Robust optimization, Spatially correlated data, Water supply system

G. Chung; K. Lansey; G. Bayraksan

2009-04-01T23:59:59.000Z

473

Granite Reliable Power | Open Energy Information  

Open Energy Info (EERE)

Reliable Power Reliable Power Jump to: navigation, search Name Granite Reliable Power Facility Granite Reliable Power Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner Brookfield Renewable Energy Group Developer Brookfield Renewable Energy Group Energy Purchaser Green Mountain Power / Central Vermont Public Service / New England Power Pool Location Milan NH Coordinates 44.74039314°, -71.28376007° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":44.74039314,"lon":-71.28376007,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

474

Consortium for Electric Reliability Technology Solutions Integrated Assessment of  

E-Print Network (OSTI)

described in this paper coordinated by the Consortium of Electricity Reliability Technology Solutions

475

Design Strategy for a Formally Veri ed Reliable Computing Platform  

E-Print Network (OSTI)

. Pecht, Ed., Product Reliability, Maintainability, and Supportability Hdbk: CRC Press, 1995. [12] A

Butler, Ricky W.

476

Mixture representations for the reliability of consecutive-k systems  

Science Conference Proceedings (OSTI)

In this paper, we obtain representations for the reliability of consecutive type systems as a mixture of the reliability of order statistics whenever the systems consist of exchangeable components. The representations enable us to compute the reliability ... Keywords: Consecutive k-out-of- n system, Consecutive k-within-m-out-of-n system, Maximal signature, Minimal signature, Order statistics, System reliability, System signature

Serkan Ery?Lmaz

2010-03-01T23:59:59.000Z

477

Comments of North American Electric Reliability Corporation (NERC) to DOE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North American Electric Reliability Corporation (NERC) North American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments of North American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Response to the Department of Energy's ("DOE") Request for Information (RFI) regarding the "Smart Grid RFI: Addressing Policy and Logistical Challenges." The North American Electric Reliability Corporation's ("NERC") Reliability Assessment and Performance Analysis Group ("RAPA") is currently developing a report, entitled "Reliability Consideration from Integration of Smart Grid" that will address many of the issues raised in the DOE RFI. North American Electric Reliability Corporation (NERC)

478

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information represents a partial sequence of events based upon Reliability Coordinator information available to NERC. It is not clear if these events caused the event or were a consequence of other events. NERC is establishing teams to study the event and will coordinate with FERC, DOE, the industry and others. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report More Documents & Publications North American Electric Reliability Council Power Outage Update North American Electric Reliability Council Outage Announcement U.S. - Canada Power System Outage Task Force: Final Report on the

479

Federal Energy Management Program: Reliability-Centered Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Reliability-Centered Maintenance to someone by E-mail Share Federal Energy Management Program: Reliability-Centered Maintenance on Facebook Tweet about Federal Energy Management Program: Reliability-Centered Maintenance on Twitter Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Google Bookmark Federal Energy Management Program: Reliability-Centered Maintenance on Delicious Rank Federal Energy Management Program: Reliability-Centered Maintenance on Digg Find More places to share Federal Energy Management Program: Reliability-Centered Maintenance on AddThis.com... Sustainable Buildings & Campuses Operations & Maintenance Federal Requirements Program Management Commissioning Metering Computerized Maintenance Management Systems

480

Investigation of the Role of Trap States in Solar Cell Reliability using Photothermal Deflection Spectroscopy  

E-Print Network (OSTI)

PV) technologies. PV reliability and degradation tests help9 1.5. Degradation and Reliability of PV1.5. Degradation and Reliability of PV materials Reliability

Bezryadina, Anna Sergeyevna

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "lauby director reliability" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Chemistry and Materials Science Directorate 2005 Annual Report  

Science Conference Proceedings (OSTI)

In 1952, we began laboratory operations in the barracks building of the Naval Air Station with approximately 50 employees. Today, the Chemistry and Materials Science (CMS) Directorate is a major organization at the Lawrence Livermore National Laboratory with more than 500 employees who continue to contribute to our evolving national security mission. For more than half a century, the mission of the Laboratory revolved primarily around nuclear deterrence and associated defense technologies. Today, Livermore supports a broad-based national security mission, and our specialized capabilities increasingly support emerging missions in human health and energy security. In the future, CMS will play a significantly expanded role in science and technology at the intersection of national security, energy and environment, and health. Our world-class workforce will provide the science and technology base for radically innovative materials to our programs and sponsors. Our 2005 Annual Report describes how our successes and breakthroughs follow a path set forward by our strategic plan and four organizing research themes, each with key scientific accomplishments by our staff and collaborators. Organized into two major sections-research themes and dynamic teams, this report focuses on achievements arising from earlier investments that address future challenges. The research presented in this annual report gives substantive examples of how we are proceeding in each of these four theme areas and how they are aligned with our national security mission. Research Themes: (1) Materials Properties and Performance under Extreme Conditions--We are developing ultrahard nanocrystalline metals, exploring the properties of nanotubes when exposed to very high temperatures, and engineering stronger materials to meet future needs for materials that can withstand extreme conditions. (2) Chemistry under Extreme Conditions and Chemical Engineering to Support National-Security Programs--Our recent discovery of a new source of coherent light adds a new tool to an array of methods we use to more fully understand the properties of materials. Insights into the early stages of polymer crystallization may lead to new materials for our national-security mission and private industry. (3) Science Supporting National Objectives at the Intersection of Chemistry, Materials Science, and Biology--We are improving drug binding for cancer treatment through the use of new tools that are helping us characterize protein-antibody interactions. By probing proteins and nucleic acids, we may gain an understanding of Alzheimer's, Mad Cow, and other neurodegenerative diseases. (4) Applied Nuclear Science for Human Health and National Security--Our work with cyanobacteria is leading to a fuller understanding of how these microorganisms affect the global carbon cycle. We are also developing new ways to reduce nuclear threats with better radiation detectors. Dynamic Teams: The dynamic teams section illustrates the directorate's organizational structure that supports a team environment across disciplinary and institutional boundaries. Our three divisions maintain a close relationship with Laboratory programs, working with directorate and program leaders to ensure an effective response to programmatic needs. CMS's divisions are responsible for line management and leadership, and together, provide us with the flexibility and agility to respond to change and meet program milestones. The three divisions are: Materials Science and Technology Division; Chemistry and Chemical Engineering Division; and Chemical Biology and Nuclear Science Division. By maintaining an organizational structure that offers an environment of collaborative problem-solving opportunities, we are able to nurture the discoveries and breakthroughs required for future successes. The dynamic teams section also presents the work of CMS's postdoctoral fellows, who bring to the Laboratory many of the most recent advances taking place in academic departments and provide a research stimulus to established research teams. Postdo

Diaz De La Rubia, T; Fluss, M J; Rath, K; Rennie, G; Shang, S; Kitrinos, G

2006-08-08T23:59:59.000Z

482

Dr. Terry Michalske SRNS Executive Vice President and SRNL Director  

NLE Websites -- All DOE Office Websites (Extended Search)

Dr. Terry Michalske Dr. Terry Michalske SRNS Executive Vice President and SRNL Director Dwayne Wilson SRNS President and CEO Dr. David Moody Manager, DOE-Savannah River 2013 Research and Technology Recognition P A T E N T S * L I C E N S E S * C R A D A S * A W A R D S * L A B O R A T O R Y D I R E C T O R A W A R D S * F E L L O W S "What we are celebrating is really the heart and core of SRS. It is that spirit of finding new solutions, new ways to address problems, integrated with a wide set of capabilities at the Savannah River Site, that allows us to solve really big challenges for the nation." "Recognizing these people is important as is congratulating them on the strengths and longevity they are placing in the Savannah River National Laboratory." "This is a night for the inventors, a night to recognize their

483

Prepared for the European Commission Directorate General for Energy  

E-Print Network (OSTI)

This final report presents the results of the analyses at relevant trends and features in the EU gas market enabling or limiting more competition. The study focuses in particular on the possible impacts of the implementation of the EU Gas Directive and subsequently of the expected effects of increasing competition and further integration of gas markets in Europe. The study is conducted in the framework of the Shared Analysis project entitled ‘Economic Foundations for Energy Policy, coordinated by FhG-ISI and prepared for the European Commission Directorate General for Energy. The report contains an analysis of the recent changes in the structure of gas demand and the supply and its consequences for enhancement of competition in the EU gas market. It discusses the role of growing gas demand, changing structure of the supply industry and access to the network. Next, the implementation EU Gas Directive is discussed. In order to deal with the uncertainty in the results of the implementation process, two extreme institutional scenarios for future development of the liberalisation process in the EU gas markets are formulated. Finally the consequences of these two gas market liberalisation scenarios are analysed. Note that part of the conclusions of the expected effects of the Directive, i.e. the expected changes in gas prices

F. Van Oostvoorn; M. G. Boots Abstract

1999-01-01T23:59:59.000Z

484

TO : F. R, Dolling, Director, Oak Rids Operations Cffice  

Office of Legacy Management (LM)

&--I33 STATES GOVER~\EKI' &--I33 STATES GOVER~\EKI' . . TO : F. R, Dolling, Director, Oak Rids Operations Cffice /3 . G /=%e.r >rr'# . J.'n . . Sms9L: m:FYx The foJlo-zLng infoxxation is being passed along in the event you w2nt to reconsider the disposition of Haist Property. From the enclosed newspaper clipping8 i t would appear that the anpraiszd v,due of the Baist i?roperty could be considerably Increased because of local real estate activity in that crea. !Phe appraised value is CO-J estimated to be substsntialljr.higher than that previously re- FaTted to you by the U, S, Engineer-s Office, I wml.d venture to say that the curre~ ,t appraisal could be somewhere around $2,09O,OO to $3,CCC,OO an 2cre. The increase being due nainly to the fact z - thst our property is nay ideally located between lana o:?Ted by the

485

Human Reliability Analysis for Design: Using Reliability Methods for Human Factors Issues  

SciTech Connect

This paper reviews the application of human reliability analysis methods to human factors design issues. An application framework is sketched in which aspects of modeling typically found in human reliability analysis are used in a complementary fashion to the existing human factors phases of design and testing. The paper provides best achievable practices for design, testing, and modeling. Such best achievable practices may be used to evaluate and human system interface in the context of design safety certifications.

Ronald Laurids Boring

2010-11-01T23:59:59.000Z

486

Reliability and Risk Significance: For Maintenance and Reliability Professionals at Nuclear Power Plants (Japanese Version)  

Science Conference Proceedings (OSTI)

This Japanese version of Report 1007079 explains the connections between the reliability and availability of commercial nuclear power plant components and their risk significance as measured by a probabilistic safety assessment (PSA). The scope covers the two most common measures of risk significance and how they can be used to inform plant decision makers about risk. It also provides guidance on achieving balance between reliability and availability when performing preventive maintenance (PM) and on est...

2012-06-19T23:59:59.000Z

487

Bridging Resilience Engineering and Human Reliability Analysis  

SciTech Connect

There has been strong interest in the new and emerging field called resilience engineering. This field has been quick to align itself with many existing safety disciplines, but it has also distanced itself from the field of human reliability analysis. To date, the discussion has been somewhat one-sided, with much discussion about the new insights afforded by resilience engineering. This paper presents an attempt to address resilience engineering from the perspective of human reliability analysis (HRA). It is argued that HRA shares much in common with resilience engineering and that, in fact, it can help strengthen nascent ideas in resilience engineering. This paper seeks to clarify and ultimately refute the arguments that have served to divide HRA and resilience engineering.

Ronald L. Boring

2010-06-01T23:59:59.000Z

488

Structural reliability analysis and seismic risk assessment  

SciTech Connect

This paper presents a reliability analysis method for safety evaluation of nuclear structures. By utilizing this method, it is possible to estimate the limit state probability in the lifetime of structures and to generate analytically the fragility curves for PRA studies. The earthquake ground acceleration, in this approach, is represented by a segment of stationary Gaussian process with a zero mean and a Kanai-Tajimi Spectrum. All possible seismic hazard at a site represented by a hazard curve is also taken into consideration. Furthermore, the limit state of a structure is analytically defined and the corresponding limit state surface is then established. Finally, the fragility curve is generated and the limit state probability is evaluated. In this paper, using a realistic reinforced concrete containment as an example, results of the reliability analysis of the containment subjected to dead load, live load and ground earthquake acceleration are presented and a fragility curve for PRA studies is also constructed.

Hwang, H.; Reich, M.; Shinozuka, M.

1984-01-01T23:59:59.000Z

489

Reliability Estimation for Double Containment Piping  

Science Conference Proceedings (OSTI)

Double walled or double containment piping is considered for use in the ITER international project and other next-generation fusion device designs to provide an extra barrier for tritium gas and other radioactive materials. The extra barrier improves confinement of these materials and enhances safety of the facility. This paper describes some of the design challenges in designing double containment piping systems. There is also a brief review of a few operating experiences of double walled piping used with hazardous chemicals in different industries. This paper recommends approaches for the reliability analyst to use to quantify leakage from a double containment piping system in conceptual and more advanced designs. The paper also cites quantitative data that can be used to support such reliability analyses.

L. Cadwallader; T. Pinna

2012-08-01T23:59:59.000Z

490

Partially stabilized zirconia piston bowl reliability  

SciTech Connect

The Weibull based ''Simplified Structural Ceramic Design Technique'' was used to calculate the reliability of a partially stabilized zirconia (PSZ) piston bowl design. The details of the method and a set of sample calculations are presented. Test results of the piston bowl showed cracks in regions which had a high calculated probability of failure. In addition cracks developed in a region of high compressive/shear stress. Since Weibull reliability analysis only uses tensile stresses this area did not have a high calculated probability of failure. Several hypotheses are presented for the mode of failure in this region. The simplified technique was used to predict what the necessary material properties would have to be for successful PSZ insert of the design shown.

Hartsock, D.L.

1987-10-01T23:59:59.000Z

491

Quantifying reliability uncertainty : a proof of concept.  

SciTech Connect

This paper develops Classical and Bayesian methods for quantifying the uncertainty in reliability for a system of mixed series and parallel components for which both go/no-go and variables data are available. Classical methods focus on uncertainty due to sampling error. Bayesian methods can explore both sampling error and other knowledge-based uncertainties. To date, the reliability community has focused on qualitative statements about uncertainty because there was no consensus on how to quantify them. This paper provides a proof of concept that workable, meaningful quantification methods can be constructed. In addition, the application of the methods demonstrated that the results from the two fundamentally different approaches can be quite comparable. In both approaches, results are sensitive to the details of how one handles components for which no failures have been seen in relatively few tests.

Diegert, Kathleen V.; Dvorack, Michael A.; Ringland, James T.; Mundt, Michael Joseph; Huzurbazar, Aparna (Los Alamos National Laboratory, Los Alamos, NM); Lorio, John F.; Fatherley, Quinn (Los Alamos National Laboratory, Los Alamos, NM); Anderson-Cook, Christine (Los Alamos National Laboratory, Los Alamos, NM); Wilson, Alyson G. (Los Alamos National Laboratory, Los Alamos, NM); Zurn, Rena M.

2009-10-01T23:59:59.000Z

492

Reliability and the Federal Energy Regulatory Commission  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and the Federal Reliability and the Federal and the Federal Reliability and the Federal Energy Regulatory Energy Regulatory Commission Commission Michael Peters Michael Peters Energy Infrastructure & Cyber Security Advisor Energy Infrastructure & Cyber Security Advisor Federal Energy Regulatory Commission Federal Energy Regulatory Commission 202 202 - - 502 502 - - 8461 8461 Michael.Peters@FERC.GOV Michael.Peters@FERC.GOV The views expressed in this The views expressed in this presentation do not represent the presentation do not represent the views of the Federal Energy views of the Federal Energy Regulatory Commission or the United Regulatory Commission or the United States. States. These views are the personal opinion These views are the personal opinion of Mike Peters!!!! of Mike Peters!!!! ☺ ☺ ☺ ☺ ☺ ☺

493

Office of Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Subtopic c. References: Subtopic c. References: 1. Thomas B. Johansson, Henry Kelly, Amulya K.N. Reddy, and Robert H. Williams, "Renewable Energy: Sources for Fuels and Electricity", Island Press, 1993 2. Patrick Takahashi and Andrew Trenka, "Ocean Thermal Energy Conversion", John Wiley & sons, 1996. *All references can be accessed at: http://archive.epri.com/oceanenergy/streamenergy.html#reports OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY 28. NATURAL DISASTER REDUCTION THROUGH TECHNOLOGY The U.S. electric power sector is a critical part of our society. Virtually all aspects of residential, industrial, and commercial activities depend on safe, reliable, and affordable electricity. Electricity is among the most infrastructure-intensive segments of the energy sector - the electricity grid includes a network of 5,000 power

494

North American Electric Reliability Council Outage Announcement |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Council Outage Announcement Council Outage Announcement North American Electric Reliability Council Outage Announcement Starting at about 4:11 p.m. EDT, major losses of electric load occurred in the northeastern United States and Canada in the Eastern Interconnection. Although the exact cause is not known at present, the outages are not the result of a terrorist attack. The areas most affected center around the Great Lakes: Michigan, Ohio, New York City, Ontario, Quebec, northern New Jersey, Massachusetts, and Connecticut. North American Electric Reliability Council Outage Announcement More Documents & Publications Blackout 2003: Final Report on the August 14, 2003 Blackout in the United States and Canada: Causes and Recommendations Blackout 2003: Blackout Final Implementation Report

495

Office of Electricity Delivery and Energy Reliability  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comments of Cisco Systems to Comments of Cisco Systems to Office of Electricity Delivery and Energy Reliability Department of Energy in Response to Request for Information: Addressing Policy and Logistical Challenges to Smart Grid Implementation Issued September 13, 2010 FR Doc. 2010-23251 November 30, 2010 Cisco Systems provides these Comments in response to the Request for Information ("RFI") issued by the Office of Electricity Delivery and Energy Reliability of the Department of Energy ("DOE") on September 13, 2010. The RFI seeks information across a broad range of topics, but also requests that commenters be "concise," and provide "facts and concrete recommendations that can augment the general knowledge." 1 1. Interoperability Standards and the Smart Grid

496

EPRI Power Switching Safety and Reliability Project  

Science Conference Proceedings (OSTI)

The EPRI Switching Safety and Reliability (SS&R) Project features 24 completed studies to date in seven broad subject areas: 1) switching process, 2) tools and technological aids used in the planning and execution of switching, 3) switching errors, 4) incident analysis and investigation, 5) management methods and processes, 6) training, and 7) definitions and terminology. This report presents the history and accomplishments of the SS&R project as well as the extent of penetration of its findings into uti...

2008-12-16T23:59:59.000Z

497

Home Area Network Performance and Reliability  

Science Conference Proceedings (OSTI)

In current deployments, the in-meter communications interface between a utilitys advanced metering infrastructure (AMI) system and a consumers home area network (HAN) could be a critical link for the implementation of retail energy services. The reliability of communications across this interface will affect the overall customer experience and may impact the value of these services. This report examines technologies currently being used in North America and elsewhere to implement that link narrowband and...

2010-12-31T23:59:59.000Z

498

On the internet grouping for reliable multicasting  

E-Print Network (OSTI)

Current implementation of multicasting is using UDP protocol which is unreliable. There are many problems in reliable multicasting that make it difficult to implement. A study of the problems of reliable multicasting and an algorithm for reliable multicast protocol are proposed in this thesis. Unfairness when some of the receivers are faster than the others, the overhead at the sender because of managing all the group members and the problem of the traffic congestion at the sender because of the acknowledgments from each receiver are the problems that our proposed algorithm solved. Our proposed protocol is to divide the multicast group into different subgroups in a way that all members of the subgroup are related in speeds, location etc. In this way, we will make the sender send the same message with different speeds to different receiver subgroups. The sender will send as many times as the number of the subgroups. This solution has the advantage that fast receivers will not wait for slow receivers until they receive their message, which will improve the performance of fast receivers. To reduce the number of acknowledgments at the sender, we select from each subgroup a member that sends acknowledgment to the sender. In this way, only one acknowledgment from the subgroup is sent to the receiver rather than every member sending an acknowledgment to the sender, which solves the problem of many acknowledgments at the sender.

Ghanem, Mohamed M.

1996-01-01T23:59:59.000Z

499

Washington DC Reliability Requirements and the Need to Operate Mirant's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington DC Reliability Requirements and the Need to Operate Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) Pursuant to Docket No. EO-05-01: Oak Ridge National Laboratory provided an analysis of the Mirant Potomac River Generation Station in 2005 and discussed the reliability requirements of the local area and the potential impacts on reliability of changing operation of the Potomac River Generating Station in this paper. Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability.pdf

500

Federal Project Director of the Year for 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Project Director of the Year for 2011 Federal Project Director of the Year for 2011 Federal Project Director of the Year for 2011 (from left to right) Daniel Poneman; David Arakawa; Phillip Kraushaar; Johnny Moore; Daniel Lehman; Ingrid Kolb (from left to right) Daniel Poneman; David Arakawa; Phillip Kraushaar; Johnny Moore; Daniel Lehman; Ingrid Kolb Presented to: David K. Arakawa For demonstrating exceptional leadership and project management acumen as Federal Project Director (FPD) for the $68.5 million Spallation Neutron Source (SNS) Instruments - Next Generation (SING) Project at Oak Ridge National Laboratory. The SING project provides five best-in-class neutron instruments to support the neutron-scattering needs of the U.S. research community. FPD since June of 2006, David led by example with a